TABLE 10-2: NATIONAL WEATHER SERVICE WEATHER

ADVISORIES
Advisory Description
Heat Advisory Excessive
Heat Outlooks
Outlooks are issued when the potential exists
for an excessive heat event in the next 3-7
days. An Outlook provides information to those
who need considerable lead-time to prepare for
the event.

Excessive Heat Watches Heat watches are issued when conditions are favorable for an excessive heat event in the
next 24 to 72 hours. A Watch is used when the
risk of a heat wave has increased but its
occurrence and timing is still uncertain.

Heat Advisory A heat advisory is issued within 12 hours of the onset of extremely dangerous heat conditions.

The general rule for this Advisory is when the
maximum heat index temperature is expected
to be 100° or higher for at least 2 days and
nighttime air temperatures will not drop below
75°.

Inland Empire:
103° or higher (June-Sept) / 100° or higher
(Oct)
Mountains:
95° or higher (June-Sept) / 90° or higher (Oct)
Low Desert:
112° or higher (June-Sept) / 108° or higher
(Oct)
A.12.a
Packet Pg. 507 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 95 ends

Advisory Description
Excessive Heat Warning Excessive heat warning is issued within 12 hours of the onset of extremely dangerous heat
conditions. The general rule for this Warning is
when the maximum heat index temperature is
expected to be 105° or higher for at least 2
days and nighttime air temperatures will not
drop below 75°.

Inland Empire:
108° or higher (June-Sept) / 105° or higher
(Oct)
Mountains:
100° or higher (June-Sept) / 95° or higher
(Oct)
Low Desert:
115° or higher (June-Sept) / 113° or higher
(Oct)
Cold Warning A Cold Warning is issued when temperatures are expected to fall below 40˚.

Source: Community Action Partnership56
Impact to Population and Structures: The impact to the population from lightning strikes, hail or freezing and/or extreme heat could involve injuries and/or deaths.

For heat, the city’s population is susceptible to heat exhaustion and heat stroke.

The elderly, children, people with functional needs and those that have preexisting medical conditions are especially susceptible to heat injuries during extreme heat.

Structures may be vulnerable to damage from varying types of extreme weather.

Extreme heat also has potential to impact vegetation.

Impact to Essential Facilities/Historical Sites: Essential facilities and/or historical sites may be susceptible to damage from types of extreme weather. Extreme heat may also impact vegetation.

Impact to Infrastructure: Extreme weather may cause power outages and disruptions to communications and transportation.
56 https://www.capriverside.org/ Retrieved July 2022
A.12.a
Packet Pg. 508 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 96 ends

Development Trends: Since vulnerability to extreme weather is citywide, future development trends are not expected to impact the vulnerability to extreme weather. New development is shown in Appendix C.

10.2.1 EXTREME WEATHER VULNERABILITY – POTENTIAL LOSS
Multiple structures throughout the city have the potential to be impacted by extreme weather. For example, if a lightning event were to damage the Conference and Recreation Center, located on Frederick Street, the potential loss could be from structural and infrastructure damage. The value of the building is $12,252,110 (does not include contents). It is estimated that the potential loss could be 1% of the value, which would be $122,521. There are no known repetitive loss properties.

CHAPTER 11: SEVERE WIND
Moreno Valley Rating: Severity = 2 Probability = 3

11.1 SEVERE WIND PROFILE – OVERVIEW
Winds around Moreno Valley are generally cyclic, blowing from the southwest and west, especially in the summer and during the day. At night, especially during the winter, a weak offshore breeze occurs. Occasionally in the fall these cyclical breezes are interrupted by strong, dry, warm desert winds (Santa Anas) from the north/northeast.

Riverside County follows wind warnings based on NWS criteria as shown below.

TABLE 11-1: NATIONAL WEATHER SERVICE WIND ADVISORIES
Advisory Description
High Wind Watch A High Wind Watch is issued when the following conditions are possible:
1) sustained winds of 40 mph or higher for one hour
or more
OR
2) wind gusts of 58 mph or higher for any duration.

High Wind Warning A High Wind Warning is issued when the following conditions are expected:
1) sustained winds of 40 mph or higher for one hour
or more
OR
2) wind gusts of 58 mph or higher for any duration.

Wind Advisory A Wind Advisory is issued when the following conditions are expected:

A.12.a
Packet Pg. 509 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 97 ends

1) sustained winds of 31 to 39 mph for an hour or
more.

AND/OR
2) wind gusts of 46 to 57 mph for any duration.

Extreme Wind Warning An Extreme Wind Warning is issued for surface winds of 100 knots (115 MPH) or greater associated
with non-convective, downslope, derecho (NOT
associated with a tornado), or sustained hurricane
winds are expected to occur within one hour.

Source: National Weather Service57

11.1.1 SEVERE WIND PROFILE – PREVIOUS OCCURRENCES
The City of Moreno Valley and surrounding area has a history of chronic windstorms. While extremely rare, the Moreno Valley area is also susceptible to tornadoes. In May of 2008, two tornadoes barreled across I-215 south of March Air Reserve Base, knocking over a tractor trailer and several box cars from a nearby train.58
Figure 11-1: May 2008 Two Tornadoes Touch Down Across I-21559 57 https://www.weather.gov/lwx/WarningsDefined Retrieved July 2022 58http://www.pe.com/articles/zone-788341-elsinore-lake.html Retrieved July 2022 59 Photo From Anonymous Author
A.12.a
Packet Pg. 510 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 98 ends

TABLE 11-2: HISTORY OF SEVERE WIND/TORNADOES NEAR

MORENO VALLEY
Year Description
1955 Tornado north of Moreno Valley60
1982 Tornado in Riverside.
1996 Tornado in Cabazon. Threw a 5-ton mobile home 30 feet. Minor damage to six other mobile homes.
1998 Tornado in Homeland, Funnel clouds in in Homeland and Moreno Valley. Damage to mobile homes on Homeland.
2005
A tornado hit Hemet. A funnel cloud was reported in Mira Loma. The tornado picked up a storage shed in Diamond Valley and threw it into a power pole.
2005 A tornado struck Hemet. Trees downed.
2005 60 -70 mph winds hit the Hemet, Canyon Lake, and Menifee region. 2006 50 mph+ winds demolished the “M” on Box Springs Mountain, above Moreno Valley
2008
May 22, Four Tornadoes touched down near Moreno Valley, one was rated on the Enhanced Fujita Scale an EF-2 and was on the ground for an exceptional 21 minutes. 9 railroad cars were derailed. A semi-truck was lifted 30 -40 feet in the air, severely injuring the driver. Damage to roofs, trailers and sheds occurred.61
2015 Wind speeds of up to 52 mph hit Moreno Valley, causing major limb loss and or tree uprooting.

The original Fujita scale, which was developed in 1971 and ranges from F0 to F5, is based upon the type and severity of damage a tornado produced. The Enhanced Fujita (EF) Scale was devised by a panel of meteorologists and engineers convened by the Wind Science and Engineering Research Center at Texas Tech University62.
60 https://data.desertsun.com/tornado-archive/california/9990151/ Retrieved July 2022 61 https://data.desertsun.com/tornado-archive/california/102641/ Retrieved July 2022 62 https://weather.com/storms/tornado/news/enhanced-fujita-scale-20130206 Retrieved July 2022 A.12.a
Packet Pg. 511 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 99 ends

FIGURE 11-1.1: ENHANCED FUJITA SCALE63

11.1.2 SEVERE WIND PROFILE – PROBABILITY OF FUTURE
EVENTS
The probably rating for this hazard is a 3, which means that there is a 10% to 100% chance that it will occur within the next year.

11.2 SEVERE WIND VULNERABILITY – OVERVIEW/IMPACT
The severity rating for this hazard is a 2, which means that there is a potential for limited damage, causing injuries and/or illnesses, complete shutdown of critical facilities for more than one week and/or 10% of property is severely damaged.

Severe wind could cause cascading hazards such as transportation and hazardous materials incidents, power outages, fires, and pipeline incidents.

Impact to Population and Structures: Severe wind and/or tornadoes could cause major injuries. The potential for impaled objects exists as well. Severe wind and/or tornadoes also pose damage to structures and cause an increased chance of fires.
63 https://weather.com/storms/tornado/news/enhanced-fujita-scale-20130206 Retrieved July 2022 A.12.a
Packet Pg. 512 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 100 ends

Impact to Essential Facilities/Historical Sites: Severe wind and/or tornadoes could cause damage to essential facilities and/or historical sites and cause an increased chance of fires.

Impact to Infrastructure: Severe wind and/or tornadoes could cause power outages.

Development Trends: Future development of buildings, structures, critical facilities, and infrastructure could be impacted by severe winds and/or tornadoes; however, there are no recommendations for changes to development trends.

New development is shown in Appendix C.

11.2.1 SEVERE WIND VULNERABILITY – POTENTIAL LOSS
Multiple structures throughout the city have the potential to be impacted by severe wind. For example, if a severe wind event were to occur, causing a power outage near the Moreno Valley Mall area during mall hours, the potential loss could be loss of retail sales and the cost to restore power. Due to limitation of data available, it is not possible to estimate the potential loss. There are no known repetitive loss properties.

A.12.a
Packet Pg. 513 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 101 ends

CHAPTER 12: DAM FAILURE/INUNDATION
Moreno Valley Rating: Severity = 2 Probability = 2

12.1 DAM FAILURE/INUNDATION PROFILE – OVERVIEW
Dam inundation is a potential flood hazard in several portions of Moreno Valley from two dams: Pigeon Pass Dam (Poorman’s Reservoir) and Perris Dam.

Pigeon Pass Dam: Failure of the Pigeon Pass Dam (Poorman’s Reservoir) could result in extensive flooding along the downstream watercourse. The risk of flooding due to dam failure is limited to the period during and immediately after major storms. The reservoir does not retain water throughout the year.

Perris Dam: Failure of the Perris Dam would only affect a very small area south of Nandina Avenue along the Perris Valley Storm Drain and the Mystic Lake area in the southeast corner of Moreno Valley.

In 2005, a study by the state found that the Perris Dam likely would crumble in the range of a 7.5 magnitude earthquake, unleashing billions of gallons of water across western Riverside County. After that, the lake was dropped 25 feet to a safer level and will remain there until repairs can be completed. The seismic repairs began in October 2014 and have been completed.
64 During remediation, the state injected cement and soil into the deepest and most unstable parts of the dam's foundation so it will better withstand shaking from an earthquake. A stability berm was built on top of the new foundation, allowing the lake to be taken to its previous level. A new outlet tower to funnel lake water into the regional drinking water system was also built.

A two-mile-long emergency channel has been constructed next to the Ramona Expressway so large water releases during a disaster would mostly be directed away from neighborhoods and into a storm drain.

The Perris dam constantly assessed and monitored.
64 http://www.water.ca.gov/lakeperris/
A.12.a
Packet Pg. 514 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 102 ends

Figure 12-1: Perris Dam Construction Project65
A map of Moreno Valley 100-year flood, 500-year flood, and dam inundation is included in Chapter 6 (Figure 6-1). Table 12-1 shows a summary of Pigeon Pass and Perris Dam information.

TABLE 12-1: PIGEON PASS AND PERRIS DAM INFORMATION

SUMMARY
Dam Height Storage
(acre-feet) Year Built Drainage Area (square miles)
Pigeon Pass 36 900 (approx.
293,000 gal) 1958 8.71
Perris 130 2,340 (approx.
42,834,000 gal) 1973 10
65 http://www.water.ca.gov/lakeperris/ Verified November 7, 2016, Retrieved July 2022 A.12.a
Packet Pg. 515 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 103 ends

12.1.1 DAM FAILURE/INUNDATION PROFILE – PREVIOUS

OCCURRENCES
There are no previous occurrences of dam failure/inundation.

12.1.2 DAM FAILURE/INUNDATION PROFILE – PROBABILITY OF

FUTURE EVENTS
The probably rating for this hazard is a 2, which means that there is between a 1% and 10% chance that it will occur within the next year.

12.2 DAM FAILURE/INUNDATION VULNERABILITY –

OVERVIEW/IMPACT
The severity rating for this hazard is a 2, which means that there is a potential for limited damage, causing injuries and/or illnesses, complete shutdown of critical facilities for more than one week and/or 10% of property is severely damaged.

For information about flooding, see Chapter 6. Dam failure/inundation could cause cascading hazards such flooding, pipeline hazards, transportation, power outages and hazardous materials incidents.

Impact to Population and Structures: The population in the dam inundation areas could be requested to evacuate. Seniors and individuals with access and functional needs may need special assistance to evacuate. An evacuation map (Figure 12-2) shows the nearby population to the inundation area. There could be damage to structures in the inundation areas affected by flood waters.

Impact to Essential Facilities/Historical Sites: Failure of the Perris Dam would only affect a very small area south of Nandina Avenue along the Perris Valley Storm Drain and the Mystic Lake area in the Southeast corner of Moreno Valley.

While two schools, Rancho Verde High School, and El Potrero Elementary School, are not located in the inundation area, they may be impacted by an evacuation. The schools near (not in) the inundation area is shown on the evacuation map (Figure 12-2). No historical sites are within the dam inundation area.

Impact to Infrastructure: An evacuation could impact transportation routes.

Development Trends: Future development will result in an increased demand for flood control and drainage services. Moreno Valley participates in the NFIP as well as the voluntary CRS, which is administered by FEMA. The NFIP program provides federal flood insurance and federally financed loans for property owners in flood prone areas. For more information about the city’s participation in NFIP and CRS, see Chapter 20.4: National Flood Insurance Program. To qualify for A.12.a
Packet Pg. 516 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 104 ends

federal flood insurance, the city must identify flood hazard areas and implement a system of protective controls. In addition, all development is required to comply with Riverside County Flood Control and Water Conservation District requirements for construction of master drainage plan facilities. New development is shown in Appendix C.

12.2.1 DAM FAILURE/INUNDATION VULNERABILITY – POTENTIAL LOSS
f a dam failure occurred at Perris Dam, the potential loss would be limited to a very small area south of Nandina Avenue along the Perris Valley Storm Drain in the southeast corner of Moreno Valley. See Chapter 6 for losses related to flooding.

There are no repetitive loss properties.

A.12.a
Packet Pg. 517 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 105 ends

FIGURE 12-2: CITY OF MORENO VALLEY EVACUATION MAP – REVISED SEPTEMBER 6, 2022 A.12.a
Packet Pg. 518 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 106 ends

CHAPTER 13: PIPELINE
MORENO VALLEY RATING: SEVERITY = 2 PROBABILITY = 2

13.1 PIPELINE PROFILE – OVERVIEW
Natural gas, oil, water, and sewer are transported via pipeline, mostly by underground pipes in developed and urban areas.

Water: Most of the city’s water is imported via the California Aqueduct from northern and central California. Box Springs Mutual Water Company serves a small portion of the community, while Eastern Municipal Water District (EMWD) has been the primary purveyor of water in Moreno Valley since the early 195066.

EMWD completed a major water supply line along Perris Boulevard in 1954 through which water became available in 1955. The existing water companies were responsible for connecting to the main water supply system, including the Edgemont Gardens Mutual Water Company and the Sunnymead Mutual Water Company. An underground segment of the aqueduct runs from the northwest corner of Moreno Valley to Lake Perris. Water from Lake Perris is pumped to the Mills Filtration Plant in the City of Riverside before it is distributed to Moreno Valley customers.

Natural Gas: The Southern California Gas Company maintains a comprehensive system of distribution and service lines throughout the city. In addition to local lines, two major 30-foot-wide transmission lines cross Moreno Valley. Line number “2001” is located on Cottonwood Avenue and line number “2000” is located on Brodiaea Avenue. Both lines run east-west through the entire city.

There are also 8-inch and 12-inch major distribution supply lines located on Indian Avenue, running north from Brodiaea Ave through Moreno Valley. All of these are considered “high-pressure” lines, meaning that they contain over 60 pounds per square inch (psi).

There is also an aviation fuel line that runs through Moreno Valley, however, this line no longer provides fuel to March Air Reserve Base. 66 https://www.socalgas.com/ Retrieved July 2022
A.12.a
Packet Pg. 519 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 107 ends

Located in the city, the Moreno Valley Pressure Limiting Station (PLS) is capable of receiving 800 million standard cubic feet per day (MMscfd) of natural gas at 850 pounds per square inch gage (PSIG) from the Adelanto Compressor Station. The Moreno Valley PLS will allow gas from the new Adelanto to Moreno Pipeline and from the new Moreno to Whitewater Pipeline to flow into any of the existing lines at the Moreno Valley PLS.67
Sewer: Eastern Municipal Water District operates over 356 miles of sewer mains (12” and above) and six sewage lift stations to provide wastewater collection services within Moreno Valley. All wastewater is collected and conveyed to the Moreno Valley Regional Water Reclamation Facility located in the southwestern portion of the city and has a capacity to treat 16 million gallons of wastewater per day (mgd) and a capacity to expand to 41 mgd. Sewer services for the southwestern Moreno Valley are provided by the Edgemont Community Services District. The District provides wastewater treatment under contract with the City of Riverside. According to the District, the pipes that transmit sewage to the City of Riverside Water Quality Control Plant are over 50 years old and are in need of repair.
67 https://www.emwd.org/ Retrieved July 2022
A.12.a
Packet Pg. 520 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 108 ends

Figure 13-1: City of Moreno Valley Pipeline Map
A.12.a
Packet Pg. 521 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 109 ends

13.1.1 PIPELINE PROFILE – PREVIOUS OCCURRENCES
Moreno Valley and the surrounding area have a history of pipeline ruptures, spillage and vandalism to natural gas and sewer lines. Table 13-1 shows incidents dating from 1991.

TABLE 13-1 MORENO VALLEY AREA NATURAL GAS AND SEWER

LINE INCIDENTS
Year Description
2008 450 gallons of sewage discharged at 13874 Rockcrest Drive68 2008 1,500 gallons of sewage discharged at 12080 Pigeon Pass69 2008 450 gallons of sewage discharged at 13874 Rockcrest Drive70 2009 2,590 gallons of sewage released at Ironwood and Talbor71 2009 270 gallons of sewage released at Pan Am and Eucalyptus72 2009 7,000 gallons of sewage released at 23650 Hemlock73 2009
Two-inch underground gas line broke on Daimler Street between Margarita Street and Bay Avenue at 2 p.m. Two homes were evacuated. Repairs took three hours.74
68 https://ciwqs.waterboards.ca.gov/ciwqs/readOnly/PublicReportSSOServlet?reportAction=criteria& reportId=sso_overview Retrieved July 2022
69 https://www.caloes.ca.gov/cal-oes-divisions/fire-rescue/hazardous-materials/spill-releasereporting Retrieved July 2022 70 https://www.caloes.ca.gov/cal-oes-divisions/fire-rescue/hazardous-materials/spill-releasereporting Retrieved July 2022 71 https://www.caloes.ca.gov/cal-oes-divisions/fire-rescue/hazardous-materials/spill-releasereporting Retrieved July 2022 72 https://www.caloes.ca.gov/cal-oes-divisions/fire-rescue/hazardous-materials/spill-releasereporting Retrieved July 2022 73 https://www.caloes.ca.gov/cal-oes-divisions/fire-rescue/hazardous-materials/spill-releasereporting Retrieved July 2022 74 https://www.pe.com/2022/06/30/riverside-residents-evacuated-after-crew-hits-gas-line/ A.12.a
Packet Pg. 522 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 110 ends

2011 A four-to-five-inch natural gas main was ruptured on Cactus Avenue east of Moreno Beach Drive at a construction site.75
2011 1,140 gallons of sewage discharged at 12640 Memorial Way76 2011 6,500 gallons of sewage discharged at 12926 Indian Street77 2011 4-inch gas main was struck by a backhoe at Cactus Avenue and Wilmot. 78
2016 Contractor breached 4-inch natural-gas line at Karma Automotive in the 17000 block of Perris Blvd.79

13.1.2 PIPELINE PROFILE – PROBABILITY OF FUTURE EVENTS
The probably rating for this hazard is a 2, which means that there is between a 1% and 10% chance that it will occur within the next year.

13.2 PIPELINE VULNERABILITY – OVERVIEW/IMPACT
The severity rating for this hazard is a 2, which means that there is a potential for limited damage, causing injuries and/or illnesses, complete shutdown of critical facilities for more than one week and/or 10% of property is severely damaged.

Pipeline incidents could cause cascading hazards such as flooding, transportation and hazardous materials incidents, civil unrest and pandemic flu or disease.

Impact to Population and Structures: Pipeline incidents could impact the population by causing injuries, illness, or death. People affected may have to be evacuated or asked to shelter in place. Seniors and individuals with access and functional needs may need special assistance to evacuate. People could be 75 https://www.pe.com/2011/08/14/inland-police-and-fire-reports-81411 Retrieved July 2022 76 https://www.caloes.ca.gov/cal-oes-divisions/fire-rescue/hazardous-materials/spill-releasereporting Retrieved July 2022 77 https://www.caloes.ca.gov/cal-oes-divisions/fire-rescue/hazardous-materials/spill-releasereporting Retrieved July 2022 78 https://www.caloes.ca.gov/cal-oes-divisions/fire-rescue/hazardous-materials/spill-releasereporting Retrieved July 2022 79 http://www.pe.com/articles/dug-808104-perris-evacuated.html Retrieved July 2022 A.12.a
Packet Pg. 523 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 111 ends

asked to drink bottled water or to boil their water before drinking if sewage were to contaminate the water. Damage to structures and/or property may occur.

Impact to Essential Facilities/Historical Sites: Essential facilities and/or historical sites could be affected by pipeline incidents. Pipeline incidents could hinder emergency operations due to lack of water or evacuation of essential facilities.

Impact to Infrastructure: A pipeline incident would have a large effect on infrastructure. For instance, a sewer line rupture could contaminate water; a water line rupture could limit emergency responder’s ability to fight fires; and a natural gas rupture could cause fires, evacuations and more.

Development Trends: An increase in development is expected to result in incremental increased demand for infrastructure. Future planned development is expected to be constructed utilizing Uniform Building Codes and design standards. New development is shown in Appendix C.

13.2.1 PIPELINE VULNERABILITY – POTENTIAL LOSS
Multiple structures throughout the city have the potential to be impacted by pipeline vulnerabilities. For example, if a gas line explosion were to occur at City Hall, the damage to the building and infrastructure could be significant and is estimated at $20 million. Additionally, a mainline event could disrupt gas delivery to and from the Adelanto area. There are no known repetitive loss properties.

A.12.a
Packet Pg. 524 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 112 ends

CHAPTER 14: TRANSPORTATION
MORENO VALLEY RATING: SEVERITY = 2 PROBABILITY = 2

14.1 TRANSPORTATION PROFILE – OVERVIEW
The City of Moreno Valley has an extensive transportation network that includes state highways, arterials and local streets, public transit, and nearby rail. For purposes of this plan, transportation emergencies involve highways, arterials, and surface streets, as well as rail and air.

Highways and Arterials - SR-60 is a major regional east-west highway linking Moreno Valley to both neighboring and outlying communities. Additional regional east-west travel is provided by Box Springs Road/Ironwood Avenue, Sunnymead Boulevard and Alessandro Boulevard, all of which are maintained by the city.

Sunnymead Boulevard serves as the traditional commercial corridor of Moreno Valley. Alessandro Boulevard serves as a major commercial and industrial corridor at its westerly end. Other major east-west routes within the city include Eucalyptus Avenue; Cottonwood Avenue; and Cactus Avenue.

I-215 is immediately to the west of the city and is the primary regional route for north-south travel linking Moreno Valley to both neighboring and outlying communities. Additional regional north-south routes include Perris Boulevard, Heacock Street, Redlands Boulevard, and Gilman Springs Road. Other northsouth access is provided by Moreno Beach Drive and Pigeon Pass Road/Frederick Street.

Rail - The nearest railway is the Burlington Northern Santa Fe railway which runs parallel to I-215. A major train derailment could impact the City of Moreno Valley if the crash involved a hazardous materials spill.

Air - There is an airfield located southwest of the city limits. The airfield is operated by two entities: March Air Reserve Base and the March Inland Port Airport Authority. The land at each end of the runway is subject to significant danger of aircraft accidents during takeoff and landing, or by collision. The land below the landing approach is designated as the clear zone and is located at the northeast corner of Heacock Street and Oleander Avenue in the city.

A.12.a
Packet Pg. 525 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 113 ends

Air crash zones are mapped into various categories: areas on or adjacent to the runway; areas within the areas within the clear zone; Accident Potential Zone (APZ) I; and Accident Potential Zone (APZ) II. The risk is greatest immediately under the takeoff and landing zone located at either end of the runway(s). The accident potential within the clear zone, which extends 3,000 feet from each end of the runway, is considered to be of such high risk that few uses are acceptable.

A small area at the extreme southwest corner of the city is within the clear zone.

A.12.a
Packet Pg. 526 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 114 ends

FIGURE 14-1: CITY OF MORENO VALLEY TRANSPORTATION MAP
A.12.a
Packet Pg. 527 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 115 ends

FIGURE 14-1.1: CITY OF MORENO VALLEY AIR CRASH HAZARD AREA MAP A.12.a
Packet Pg. 528 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 116 ends

14.1.1 TRANSPORTATION PROFILE – PREVIOUS OCCURRENCES
TABLE 14-1: MORENO VALLEY TRANSPORTATION HISTORY OF

INCIDENTS
Year Description
1998
Union Pacific train derailment occurred with 4,000 gallons of hazardous fuel near Moreno Valley in San Timoteo Canyon. Damage costs were estimated at $1.3 million.80
1999 Amateur built airplane crashes in a parking lot one mile from March Air Reserve Base.81
2003
18-wheeler tanker drives off the SR-60 overpass at Perris Boulevard. 82 Tanker truck explodes shortly after impact and there was a hazardous material spill.
2003 Train derailment in San Timoteo Canyon scatters 22 rail cars and three locomotives from two trains along the tracks.83
2005 Moreno Valley Fire Department fire engine rolls off eastbound Interstate 10 at SR-60 during severe rainstorm.
84 2006 Nine engines derail in San Timoteo Canyon it to be closed between Alessandro Road and Redlands Boulevard. 85
2010 Private plane runs out of fuel and crash lands in Moreno Valley at Cactus Avenue and Redlands Boulevard.86
80 Press Enterprise, 1998
81 https://planecrashmap.com/plane/ca/N3415M/ Retrieved July 2022 82 Press Enterprise Rib plunges off overpass January 8, 2003 83 https://www.latimes.com/archives/la-xpm-2003-sep-26-me-sbriefs26.2-story.html Retrieved July 2022
84 https://www.firehouse.com/lodds/news/10506325/riverside-county-calif-firefighter-killed-infreeway-rollover Retrieved July 2022 85 https://www.trainorders.com/discussion/read.php?1,1228276 Retrieved July 2022 86 https://www.sbsun.com/2010/12/13/plane-in-nov-21-crash-that-killed-3-south-bay-men-ran-outof-fuel/ Retrieved July 2022 A.12.a
Packet Pg. 529 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 117 ends

2010 Plane crashes near Lake Perris, killing the pilot.87 2011
18-wheeler truck turned on its side on eastbound SR-60 at Theodore due to the truck being driven too fast for the conditions. Driver was killed.
2011 18-wheeler semi-truck collides with RV on eastbound SR-60 at Perris Boulevard. 40 gallons of diesel fuel spill. 88
2015
Construction equipment on a flatbed truck struck the westbound SR-60 overpass at Theodore Street. Pieces of the overpass fell into westbound lanes, striking some vehicles.89
2019
An F-16 with live ordinance on board crashed on the border of Moreno Valley and Riverside in the unincorporated area of Riverside County.

No fatalities occurred. 90

14.1.2 TRANSPORTATION PROFILE – PROBABILITY OF FUTURE
EVENTS
The probably rating for this hazard is a 2, which means that there is between a 1% and 10% chance that it will occur within the next year.

14.2 TRANSPORTATION VULNERABILITY – OVERVIEW/IMPACT
The severity rating for this hazard is a 2, which means that there is a potential for limited damage, causing injuries and/or illnesses, complete shutdown of critical facilities for more than one week and/or 10% of property is severely damaged Impact to Population and Structures: Highway, arterial roads, and streets as well as air and/or rail incidents could cause severe injuries and/or deaths. They could also cause burns and/or illness due to exposure to fires and/or potential hazardous materials on board. Structures could be damaged or could be used for sheltering.
87 https://www.nbclosangeles.com/news/local/pilot-killed-in-plane-crash-near-morenovalley/1865440/ Retrieved July 2022 88 https://kesq.com/news/2011/02/11/major-crash-on-highway-60-sends-two-to-hospital/ Retrieved July 2022
89 http://www.pe.com/articles/bridge-759303-westbound-struck.html Retrieved October 31, 2016 90 https://www.desertsun.com/story/news/nation/2019/05/16/f-16-fighter-jet-crashes-march-airreserve-base-california/3700934002/ Retrieved July 2022 A.12.a
Packet Pg. 530 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 118 ends

Impact to Essential Facilities/Historical Sites: Essential facilities could be damaged or impacted by cascading hazards such as power outages, pipeline ruptures or hazardous materials incidents from transportation hazards.

Impact to Infrastructure: Infrastructure could be impacted by cascading hazards such as power outages, pipeline ruptures or hazardous materials incidents from transportation hazards.

Development Trends: Development is expected to increase demand on transportation infrastructure. New residential developments in the eastern portion of the city will require the installation of additional infrastructure such as new roadways, water systems, and sewage disposal to serve these areas.

Future development will comply with adopted land use standards, policies, and ordinances and will be compatible with land uses in surrounding areas. For air hazards, only open space uses are appropriate within the clear zone. New development is shown in Appendix C.

14.2.1 TRANSPORTATION VULNERABILITY – POTENTIAL LOSS
Air: There are 3 historical sites valued at $81,170 and 27 commercial businesses valued at $42,134,023 located within the air crash zone. Data is based on the structure value received from Riverside County Assessor (October 2016). No contents were valued.

Due to the limitation of data related to rail and highway losses within Moreno Valley, it is not possible to analyze the potential loss. There are no known repetitive loss properties.

CHAPTER 15: POWER OUTAGE
MORENO VALLEY RATING: SEVERITY = 3 PROBABILITY = 4

15.1 POWER OUTAGE PROFILE – OVERVIEW
A power failure can range in magnitude and impact from a relatively modest power outage to a catastrophic regional blackout. Power outages may affect a specific area of the City of Moreno Valley or the entire city.

15.1.1 POWER OUTAGE PROFILE – PREVIOUS OCCURRENCES
The City of Moreno Valley has been affected by power outages in the past for various reasons, such as severe winds, storms and damaged power equipment A.12.a
Packet Pg. 531 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 119 ends

and equipment failures. Table 15-1 shows a history of power outages affecting the City of Moreno Valley.

Table 15-1: History of Power Outages in Moreno Valley
Year Description
1998 Power outage affects Moreno Valley causing Canyon Springs High School to delay basketball games. 91
2003 High winds cause power outage in Moreno Valley.92
2005
Power outage for the Lasselle circuit occurs due to a storm. 466 Moreno Valley Utility customers are without power for 2 hours, 5 minutes.93
2006 1,175 residents are without power for 2 hours when Moreno Valley Utility’s Lasselle Circuit goes down. 94
2006 1,245 residents are without power for 3 ½ hours when Moreno Valley Utility’s Cactus circuit goes down. 95
2006 950 residents are without power for 1 hour 5 minutes when Moreno Valley Utility’s Globe circuit goes down. 96
2006 1,175 residents are without power for 5 hours, 50 minutes when Moreno Valley Utility’s Lasselle circuit goes down.
97 2006 1,245 residents are without power for 3 ½ hours when Moreno Valley Utility’s Cactus circuit goes down. 98
91 http://www.socalhoops.tierranet.com/archive/prepnotes/Feb98/riv211c.htm Retrieved September 27, 2011
92 MTV-3 provided photographs of wind event that occurred in 2003 showing downed power lines 93 Information provided by Moreno Valley Utility on September 27, 2011 94 Information provided by Moreno Valley Utility on September 27, 2011 95 Information provided by Moreno Valley Utility on September 27, 2011 96 Information provided by Moreno Valley Utility on September 27, 2011 97 Information provided by Moreno Valley Utility on September 27, 2011 98 Information provided by Moreno Valley Utility on September 27, 2011 A.12.a
Packet Pg. 532 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 120 ends

2006 Power outage due to a prolonged heat wave affects Moreno Valley.99
2007
Planned power outage by Southern California affects 800 residents in the area between Moreno Beach Drive and Redlands Boulevard and extends from Eucalyptus and Dracaea avenues on the north, to Cottonwood and Bay avenues on the south.100
2009
Southern California Edison power outage affects 268,000 residents in Riverside County for 10 minutes, including residents in Moreno Valley.101
2010 Southern California Edison power outage affects residents in Riverside County, including Moreno Valley.102
2010 3,906 Moreno Valley Utility customers lose power for 58 minutes.103 2010 890 Moreno Valley Utility customers lose power for 1 hour 6 minutes.104
2010 High winds caused power outages statewide, 4,000 residents affected in Moreno Valley.105
2010 200 Moreno Valley Utility customers lose power for 14 hours 37 minutes when a vehicle collides with a capacitor bank.106 2011 Massive power outage affecting electric customers in western Arizona, Southern California, and northern Baja, Mexico has an 99 http://www.edison.com/pressroom/pr.asp?bu=sce&year=0&id=6317 Retrieved September 27, 2011
100 http://www.pe.com/localnews/morenovalley/stories/PE_News_Local_R_rpower19.5eda61.html Retrieved September 27, 2011
101 http://weathercurrents.com/morenovalley/NewsItemDisplay.do?Id=548 Retrieved September 27, 2011
102 http://www.nbclosangeles.com/news/local/Large-Power-Outage-in-Riverside-County.html Retrieved September 27, 2011
103 Information provided by Moreno Valley Utility on September 27, 2011 104 Information provided by Moreno Valley Utility on September 27, 2011 105 http://www.fema.gov/emergency/reports/2010/nat012010.shtm September 27, 2011 106 Information provided by Moreno Valley Utility on September 27, 2011 A.12.a
Packet Pg. 533 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 121 ends

impact on Moreno Valley as residents from those areas travel to cities with power.107
2011
Blackout continues to affect 1,808 homes and businesses in Moreno Valley where officials are uncertain of the cause and when repairs will be completed.108
2012 Power to more than 2,500 customers was cut after downed power lines draped over roofs, fences and into pools in Moreno Valley.109 2013 Equipment failure caused power outage for 1,115 Moreno Valley Utility customers for 73 minutes.110
2014 5,597 Moreno Valley Utility customers without power for 3 minutes.111
2015 All-day blackout affected 369 Moreno Valley homes, businesses112 2016 Moreno Valley blackout affected 10,000 homes113

15.1.2 POWER OUTAGE PROFILE – PROBABILITY OF FUTURE
EVENTS
The probably rating for this hazard is a 4, which means that it is highly likely and there is a near 100% chance that it will occur within the next year.

15.2 POWER OUTAGE VULNERABILITY – OVERVIEW/IMPACT
The severity rating for this hazard is a 3, which means that there is a potential for critical damage, causing injuries and/or illnesses resulting in permanent disability, 107 http://en.wikipedia.org/wiki/2011_Southwestern_United_States_blackout Retrieved September 27, 2011
108 http://www.pe.com/articles/area-628481-began-lasselle.html Retrieved November 3, 2016 109 http://www.nbclosangeles.com/news/local/Moreno-Valley-Downed-Power-Lines146915005.html Retrieved November 3, 2016 110 Information provided by Moreno Valley Utility on November 3, 2016 111 Information provided by Moreno Valley Utility on November 3, 2016 112 http://www.pe.com/articles/homes-769043-blackout-moreno.html Retrieved November 3, 2016 113 http://www.pe.com/articles/website-818261-nov-california.html Retrieved November 15, 2016 A.12.a
Packet Pg. 534 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 122 ends

complete shutdown of critical facilities for two weeks and/or 25% to 49% of property is severely damaged. Power outages could cause cascading hazards such as transportation incidents, civil unrest, and disease.

Loss of electric power could have a major impact on the City of Moreno Valley and its citizens.

Impact to Population and Structures: The impact to the population from loss of power may include disruption of power to critical medical devices. Medical conditions could be affected by an increase of temperatures due to loss of the use of air conditioners or fans. Loss of lighting and the inability to keep perishables refrigerated would also impact the population. Structures would be impacted due to loss of power to elevators, lighting, air conditioning, communications and other systems that may not operate without a generator or alternate power sources.

Impact to Essential Facilities/Historical Sites: Essential facilities would be impacted due to loss of power to elevators, lighting, air conditioning, communications and other systems that may not operate without a generator or alternate power sources. A power outage could impact emergency operations.

Historical sites within Moreno Valley would be impacted the same as structures listed above.

Impact to Infrastructure: Loss of power would severely impact infrastructure. It would affect traffic signals, which would increase in the probabilities of traffic collisions, and various types of communication infrastructure which could fail after prolonged power outage.

Development Trends: New development will result in an additional demand for electricity; however, General Plan objectives and associated policies encourage the efficient use of energy, including passive cooling with landscaping and the use of solar power. New development is shown in Appendix C.

15.2.1 POWER OUTAGE VULNERABILITY – POTENTIAL LOSS
If a power outage were to occur citywide for eight hours, the potential would be limited to loss of perishables, cost of fuel to run generators, potential for damage to vehicles from traffic accidents and loss of income to commercial businesses.

Potential losses from days-long or longer outages could escalate exponentially in terms of financial and human costs as powered medical infrastructure fails. There are no repetitive loss properties.

A.12.a
Packet Pg. 535 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 123 ends

CHAPTER 16: HAZARDOUS MATERIALS ACCIDENT
MORENO VALLEY RATING: SEVERITY = 3 PROBABILITY = 3

16.1 HAZARDOUS MATERIALS PROFILE – OVERVIEW
Hazardous materials are any substance or combination of substances that may pose a risk to human health and safety or to the environment. Hazardous materials include toxic, corrosive, infectious, flammable, explosive and radioactive materials.

Businesses, public or private institutions and private households all use or generate hazardous materials to some extent. Some of the larger businesses use certain classes of hazardous materials that require accidental release scenario modeling in order to plan, prepare and respond to the worst-case scenario.

Hazardous materials are routinely manufactured, used, stored, or transported in nearly every community and could therefore occur throughout the City of Moreno Valley. The probability of hazardous materials spills is accentuated with the city being bordered by two major transportation corridors and that the region is susceptible to earthquakes. Loss of human and wildlife, as well as significant effects on the environment and substantial cleanup costs could have a large impact on the city.

A hazardous chemical release in the City of Moreno Valley would most likely occur either by transportation of chemicals, the use of chemicals at a business, or illegal dumping of chemical waste.

City of Moreno Valley Records indicate there is currently one business located in the city which exceeds the Federal and California threshold for storing chemicals and is required to file both Federal and California response plans. According to the County of Riverside Department of Environmental Health, the City of Moreno Valley has 38 sites permitted as underground or above ground storage tank facilities; 208 sites permitted as hazardous waste generator facilities; and 314 sites permitted as hazardous chemical disclosure facilities 114. Figure 16-1 shows locations of hazardous material sites throughout Moreno Valley. 114 Data provided electronically November 2, 2016 by County of Riverside Department of Environmental Health at city’s Request
A.12.a
Packet Pg. 536 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 124 ends

FIGURE 16-1: CITY OF MORENO VALLEY HAZARDOUS MATERIALS SITE LOCATIONS MAP – REVISED SEPT. 26, 2022
A.12.a
Packet Pg. 537 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 125 ends

FIGURE 16-1: PART 2: CITY OF MORENO VALLEY HAZARDOUS MATERIALS SITE LOCATIONS MAP – REV. SEPT. 26, 2022
A.12.a
Packet Pg. 538 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 126 ends

16.1.1 HAZARDOUS MATERIALS PROFILE – PREVIOUS OCCURRENCES The following table describes hazardous materials incidents that have impacted Moreno Valley and surrounding area.

TABLE 16-1: MORENO VALLEY HAZARDOUS MATERIALS INCIDENT

HISTORY
Year Description
2008 Unknown amount of digester gas released at 17140 Kitching Street by Eastern Municipal Water District115
2008 30,000 cubic feet of methane gas released due to power outage at 17140 Kitching Street116
2008 70 gallons mineral oil at 21272 O'Casey Ct. due to an equipment failure of a pad mount transformer.117
2008 70 gallons mineral oil at 25944 Andre Ct due to an equipment failure of a pad mount transformer. 118
2009 Westbound SR-60 just east of mile marker 24 in Moreno Valley is an 80-gallon diesel fuel spill.119
2010
46,885 cubic feet of digester gas was released at the EMWD facility located at 17140 Kitching Street. Attributed to a power loss to the pressure gauge that controls flare offs.120
115 http://www.CalOES.ca.gov/HazardousMaterials/Documents/HazMat%20Spill%20Reports%202008.xls Retrieved September 26, 2011
116 http://www.CalOES.ca.gov/HazardousMaterials/Documents/HazMat%20Spill%20Reports%202008.xls Retrieved September 26, 2011
117 http://www.CalOES.ca.gov/HazardousMaterials/Documents/HazMat%20Spill%20Reports%202008.xls Retrieved September 26, 2011
118 http://www.CalOES.ca.gov/HazardousMaterials/Documents/HazMat%20Spill%20Reports%202008.xls Retrieved September 26, 2011
119 http://www.CalOES.ca.gov/HazardousMaterials/Documents/Hazmat%20Spill%20Reports%202009.xls Retrieved September 26, 2011
120 http://www.CalOES.ca.gov/HazardousMaterials/Documents/Hazmat%20Spill%20Reports%202010.xls Retrieved September 26, 2011
A.12.a
Packet Pg. 539 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 127 ends

2011
An 18-wheeler semi-truck caught fire on eastbound SR-60 at Frederick Street.

The fuel tank ruptured which caused the fire as well as a freeway closure for several hours. 121
2011 Westbound SR-60 is closed from Beaumont to Moreno Valley due to a 100- gallon fuel spill.122
2011 68 gallons of Mineral Oil spilled by Southern California Edison at 23343 Hemlock123
2011 500 gallons of Ferric Chloride spilled at 17140 Kitching Street by EMWD. Spill was contained by their containment area. 124
2014 An unknown chemical leak – in gas form – sent a firefighter and three police officers to hospital and closed down a high school in Riverside.125

16.1.2 HAZARDOUS MATERIALS PROFILE – PROBABILITY OF FUTURE EVENTS
The probably rating for this hazard is a 3, which means that there is a 10% to 100% chance that it will occur within the next year. From hazardous materials disclosures of existing businesses on file, County of Riverside Department of Environmental Health has identified 560 businesses with varying quantities, forms, and types of hazardous materials on site both interior and exterior.

16.2 HAZARDOUS MATERIALS VULNERABILITY – OVERVIEW/IMPACT The severity rating for this hazard is a 3, which means that there is a potential for critical damage, causing injuries and/or illnesses resulting in permanent disability, complete shutdown of critical facilities for two weeks and/or 25% to 49% of property is severely damaged.
121 http://www.swrnn.com/2011/01/26/highway-60-in-moreno-valley-closed-tuesday-night-by-crash-and-fire/ Retrieved September 26, 2011
122 http://www.kpsplocal2.com/news/local/story/100-Gallon-Fuel-Spill-Prompts-BadlandsFreeway/X7WvEkjOW0-5ghMaXD5h7g.cspx?rss=2276 Retrieved September 25, 2011 123 http://www.CalOES.ca.gov/HazardousMaterials/Documents/HazMat%20Spill%20Reports%202011.xls Retrieved September 26, 2011
124 http://www.CalOES.ca.gov/HazardousMaterials/Documents/HazMat%20Spill%20Reports%202011.xls Retrieved September 26, 2011
125 http://www.nbclosangeles.com/news/local/Unknown-Gas-Leak-Prompts-Evacuations-in-Areas-ofRiverside-280540172.html Retrieved November 8, 2016 A.12.a
Packet Pg. 540 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 128 ends

Impact to Population and Structures: Severe or prolonged exposure to hazardous materials is expected to cause injuries and/or deaths. In addition, people may be evacuated or asked to shelter in place during a hazardous materials incident. Seniors and individuals with access and functional needs may need special assistance to evacuate.

People may also be required to be decontaminated to remove the hazard from their structures, property, and clothing. There may be economic impacts as well due to cleanup and removal of hazardous materials.

Impact to Essential Facilities/Historical Sites: Exposure to hazardous materials could impact essential facilities and historical sites. Essential facilities may be closed for decontamination, thus causing an interruption to services.

Impact to Infrastructure: Runoff from hazardous materials has a potential to affect the waterways and drainage systems, as toxic substances may leach into local groundwater supplies. Also, transportation systems could be impacted due to decontamination and increased congestion from evacuation efforts.

Development Trends: Future development of buildings, residential structures, critical facilities, and infrastructure are expected to be constructed according to the most recent Uniform Building Codes and design standards and are expected to carefully consider for adding to vulnerability from hazardous materials. New development is shown in Appendix C.

16.2.1 HAZARDOUS MATERIALS VULNERABILITY – POTENTIAL LOSS Analysis of the one business located in Moreno Valley that exceeds the Federal and California threshold for storing chemicals shows that a worst-case scenario could have a significant environmental and financial impact to the City of Moreno Valley. Due to the limitation of data available and the range of potential impacts, it is not possible to calculate the potential loss. There are no known repetitive loss properties.

CHAPTER 17: TERRORIST ATTACK
MORENO VALLEY RATING: SEVERITY = 4 PROBABILITY = 2

17.1 TERRORIST ATTACK PROFILE – OVERVIEW
Terrorism, as defined by the FBI, is "the unlawful use of force against persons or property to intimidate or coerce a government, the civilian population or any segment thereof, in the A.12.a
Packet Pg. 541 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 129 ends

furtherance of political or social objectives."
126 The act of terrorism could involve chemicals,
biological, radiological, or nuclear agents, explosives, or cyber-terrorism.

A specific location for a terrorist attack is not known; however, some of the most likely targets could be Moreno Valley locations including March Air Reserve Base (MARB); Riverside University Health System (RUHS); Kaiser Hospital; and the San Diego Gas & Electric (SDG&E) Moreno natural gas compressor station. These are some considered high-profile targets but acts of terrorism could occur anywhere within the City of Moreno Valley and has the potential to impact a portion or all of the City of Moreno Valley.

17.1.1 TERRORIST ATTACK PROFILE – PREVIOUS OCCURRENCES
The City of Moreno Valley has not experienced a major terrorism attack; however, many parts of our Nation can’t say the same. From mass shootings to cars being driven into crowed streets, terrorism is something that is beginning to plaque too many communities.

Terrorism attacks can take many forms, from incendiary devices to biological weapons to weapons of mass destruction. On September 11, 2001, the United States of America was attacked by terrorists when four airplanes were hijacked by members of Al-Qaeda. Two of these planes were crashed into the World Trade Center, one into the Pentagon, and the fourth never reached its destination as the passengers retook control of the airplane and crashed it into a field in Pennsylvania. These major terrorist attacks were followed one week later by the mailing of anthrax to two United States Senators and several news media offices, killing five people and infecting 17 others.127
Shortly after the 2011 attacks, the City of Moreno Valley experienced four incidents of potential terror attacks in the form of unmarked white powder being left at area school campuses. These fours incidents occurred in October 2001, and all four incidents involved white powder being left on campus. After testing, all white powders were later determined to be non-hazardous.

Although not occurring in the City of Moreno Valley, the December 2, 2015 terrorist attack at the Inland Regional Center (IRC) did occur in the adjacent city of San Bernardino, which is approximately a 10-mile drive from the City of Moreno Valley. The IRC is a regional medical center whose primary mission is to assist people with developmental disabilities.

On this day, a mass shooting and attempted bombing incident occurred at the IRC located in the City of San Bernardino. In this attack, two suspects shot the victim-employees during 126 http://www.nij.gov/topics/crime/terrorism/pages/welcome.aspx Retrieved November 3, 2016 127 http://en.wikipedia.org/wiki/2001_anthrax_attacks
A.12.a
Packet Pg. 542 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 130 ends

a training meeting at the IRC. As a result of the incident, 14 victims were killed, and another 22 were wounded. A brief encounter with police also resulted in the deaths of the two suspects. Preliminary reports about the incident indicate that the suspects may have been on an Islamic jihadist mission against America.

TABLE 17-1: HISTORY OF MORENO VALLEY TERRORIST ATTACK

INCIDENTS OF CONCERN
Year Description
2001 White powdery substance is found at Canyon Springs High School and was treated as an anthrax incident.128
2001 White powdery substance is discovered at Sunnymead Middle School.

Substance was treated as if it was anthrax.129
2001
White powdery substance located next to a cargo container on Moreno Valley Unified School District property. Incident was initially responded to as an anthrax incident until it was determined that the white powder was chalk for marking athletic fields.130
2001 White powdery substance found at Bayside Elementary School and treated as an anthrax incident.131
2004
On the five-year anniversary of the Columbine High School attacks, a backpack with a bomb threat note is located at Canyon Springs High School.

Riverside Sheriff’s Department Hazardous Device Team detonates the backpack. Upon investigation, no parts to a bomb device were located after the backpack was detonated.

On the same day, another bomb threat was received for March Mountain High School, but no device was located.
132
2004 The city receives a phone call stating that there is a bomb located inside City Hall. The building is evacuated while the Riverside Sheriff’s Department 128 Notes from meeting with Moreno Valley Unified School District 129 http://en.wikipedia.org/wiki/2001_anthrax_attacks
130 http://en.wikipedia.org/wiki/2001_anthrax_attacks
131 http://en.wikipedia.org/wiki/2001_anthrax_attacks
132 http://www.pe.com/localnews/morenovalley/stories/PE_News_Local_bomb21.f0b0.html Retrieved September 27, 2011
A.12.a
Packet Pg. 543 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 131 ends

conducts a search of the facility for any potential hazardous device. No device is located.133
2010
A bomb threat note was found at Canyon Springs High School causing the campus to be evacuated while the Riverside Sheriff’s Department searched for the device. No bomb was located.134
TABLE 17-1: HISTORY OF MORENO VALLEY TERRORIST ATTACK
INCIDENTS OF CONCERN (CONT’D)
Year Description
2015
A mass shooting incident occurred in the neighboring City of San Bernardino. Two suspects shot and wounded 22 people, and killed another 14, before being killed during the incident. Preliminary reports after the incident indicate the suspects may have been committing Islamic Jihad against America.
2016
A cardboard box filled with assorted harmless items prompted a bomb scare that closed off a major intersection. It was determined there was nothing dangerous inside the box and the area was reopened to traffic.135

17.1.2 TERRORIST ATTACK PROFILE – PROBABILITY OF FUTURE EVENTS The probably rating for this hazard is a 2, which means that there is between a 1% and 10% chance that it will occur within the next year.

17.2 TERRORIST ATTACK VULNERABILITY – OVERVIEW/IMPACT
The severity rating for this hazard is a 4, which means that there is a potential for catastrophic damage, causing multiple deaths, complete shutdown of critical facilities for 30 days or more and more than 50% of property has a potential to be damaged. 133 Meeting notes on debriefing for the evacuation of City Hall due to a bomb threat 134 http://www.instantriverside.com/2010/04/canyon-springs-high-school-bomb-threat/ Retrieved September 27, 2011
135 http://www.pe.com/articles/bomb-805907-box-moreno.html Retrieved November 3, 2016 A.12.a
Packet Pg. 544 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 132 ends

Impact to Population and Structures: A terrorist attack is expected to cause multiple deaths and injuries and extensive damage to structures. The amount of expected injuries and deaths is dependent on the type of terrorist event.

Impact to Essential Facilities/Historical Sites: Government buildings, schools, hospitals, critical infrastructure, special events and historical sites are especially vulnerable to terrorist attacks. The impact could be devastating, and could severely interrupt emergency response efforts, as well as government services.

Impact to Infrastructure: Depending on the type of attack, it is expected that a terrorist attack would have a severe impact on infrastructure. Depending on the type of incident, this could involve loss of electricity, water, sewer, and communications.

Development Trends: Future development of buildings, structures, critical facilities, and infrastructure could be impacted by a terrorist attack, depending on the location of the incident. The environmental impact of biological, chemical and/or radiological contamination may need to be considered prior to future development. New development is shown in Appendix C.

A.12.a
Packet Pg. 545 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 133 ends

17.2.1 TERRORIST ATTACK VULNERABILITY – POTENTIAL LOSS
If a terrorist attack were to occur at City Hall, the structural and infrastructure damage could be approximately $25 million. There are no repetitive loss properties.

MORENO VALLEY RATING: SEVERITY = 2 PROBABILITY = 2

18.1 CIVIL UNREST PROFILE – OVERVIEW
Civil unrest typically begins as non-violent gatherings and progresses to violence. These types of incidents have a potential to escalate into destruction of property, purposefully set fires, and injury to others. Often times, injuries are restricted to police and individuals observed to be breaking the law. Out of control crowds have been known to throw bottles, rocks, and other projectiles. Civil unrest incidents could happen in any location, but they typically occur near government buildings.

18.1.1 CIVIL UNREST PROFILE – PREVIOUS OCCURRENCES
The City of Moreno Valley does not have a history of violent civil unrest. Fortunately, the civil demonstrations included were non-violent in nature.

TABLE 18-1: HISTORY OF MORENO VALLEY CIVIL DEMONSTRATIONS Year Description
2001
Protestors marched in front of the Moreno Valley police station regarding the shooting of an African American male by a Riverside County Sheriff Deputy.136 This was a non-violent protest. 2006
1,000 demonstrators gathered at Moreno Valley Community Park to demonstrate against the passage of House of Representatives Bill 4377 (H.R. 4377), a Federal law aimed at illegal immigration.

Protestors then marched to City Hall and conducted a non-violent protest regarding the passage of this Federal legislation.137 2013
Hundreds of protestors gathered at Moreno Valley City Hall to demonstrate against city council member recalls and major warehousing projects. Protestors were peaceful and conducted a non-violent protest.
136 http://la.indymedia.org/news/2001/03/5706_comment.php?theme=2 Retrieved September 26, 2011 137 http://www.pe.com/localnews/morenovalley/stories/PE_News_Local_M_mprotest02.7f76ec.html Retrieved September 26, 2011
A.12.a
Packet Pg. 546 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 134 ends

2016
200 protestors gathered at Sunnymead Park to demonstrate against the shooting of African Americans throughout the nation. Protestors then peacefully marched to the Moreno Valley Mall and conducted a non-violent protest.

18.1.2 CIVIL UNREST PROFILE – PROBABILITY OF FUTURE EVENTS The probably rating for this hazard is a 2, which means that there is between a 1% and 10% chance that it will occur within the next year.

18.2 CIVIL UNREST VULNERABILITY – OVERVIEW/IMPACT
The severity rating for this hazard is a 2, which means that there is a potential for limited damage, causing injuries and/or illnesses, complete shutdown of critical facilities for more than one week and/or 10% of property is severely damaged.

Impact to Population and Structures: Injuries could occur to protestors or demonstrators and are often a result of resisting arrest and exposure to tear gas or mace but could also be due to protestors throwing bottles or other projectiles. Impacts to buildings and structures could involve physical damage including smashed windows; building destruction; and fire damage.

Impact to Essential Facilities/Historical Sites: Protestors could damage facilities and/or historical sites during civil unrest. Impact to essential facilities and/or historical sites could involve smashed windows, building destruction and fire damage.

Impact to Infrastructure: Protestors could damage facilities and/or historical sites during civil unrest. The impact could involve loss of electricity, water, sewer, and communications.

Development Trends: Future development of buildings, structures, critical facilities, and infrastructure would not be impacted by civil unrest. New development is shown in Appendix C.

18.2.1 CIVIL UNREST VULNERABILITY – POTENTIAL LOSS
If civil unrest were to occur at the Public Safety Building involving, perhaps, fire, the potential loss could be $13.5 million. There are no repetitive loss properties.

A.12.a
Packet Pg. 547 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 135 ends

CHAPTER 19: PANDEMIC FLU/DISEASE
MORENO VALLEY RATING: SEVERITY = 3 PROBABILITY = 2

19.1 PANDEMIC FLU/DISEASE PROFILE – OVERVIEW
A pandemic is an epidemic of world-wide proportions. Throughout history there have been a number of pandemics such as smallpox, tuberculosis, measles, and polio. In recent years, pandemics include HIV/AIDS, Influenza, and Pertussis (whooping cough), and the ongoing Coronavirus (Covid-19) which began in February 2020 and continues today.

Significant public health emergencies have been affecting populations for centuries. Some of the notable pandemics in history are:
14th century, Black Death – The Black Death was a medieval pandemic that killed approximately 25 million people in Europe. This pandemic lingered for centuries. 138
1918–1919, Spanish Flu – The Spanish Flu caused an estimated 50 million deaths worldwide with nearly 675,000 of those deaths in the United States.139 1968, Influenza (H3N2) – An estimated 1 million deaths occurred worldwide with 100,000 in the United States. Most excessive deaths were in people 65 years or older.140 2005-2015 (at its peak), HIV/AIDS – HIV/AIDS has killed more than 36 million people since 1981. From 2005-2012, the annual global deaths from HIV/AIDS dropped from 2.2 million to 1.6 million.141
2020-Current, Covid-19 – Covid-19 has killed over 1 million people in the United States and nearly 6.5 million worldwide. With new variants emerging every couple of months, this pandemic could continue for years to come.
138 https://www.nationalgeographic.com/science/article/the-plague Retrieved July 2022 139 https://www.cdc.gov/flu/pandemic-resources/reconstruction-1918-virus.html Retrieved July 2022 140 http://www.cdc.gov/flu/pandemic-resources/basics/past-pandemics.html Retrieved July 2022 141 https://www.mphonline.org/worst-pandemics-in-history/ Retrieved July 2022 A.12.a
Packet Pg. 548 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 136 ends

19.1.1 PANDEMIC FLU/DISEASE PROFILE – PREVIOUS OCCURRENCES In 2022 Riverside County began and continues to experience significant cases of Respiratory Syncytial Virus, or RSV, which typically causes mild, cold-like symptoms, but can be particularly serious for infants and older adults. It is the most common cause of bronchiolitis (inflammation of the small airways in the lung) and pneumonia (infection of the lungs) in children younger than 1 year old in the United States. Symptoms of RSV can include shallow or difficulty breathing, cough, poor appetite, listlessness or irritability and it can cause bronchiolitis (inflammation of the small airways in the lung) and pneumonia (infection of the lungs). Public Health officials continue ongoing public messaging campaigns about the dangers of this and other respiratory illnesses and how to prevent them. 142 The City of Moreno Valley continues to monitor case numbers affecting the population in the city and throughout the County.

In late February 2020, the City of Moreno Valley, in cooperation with the County of Riverside, was notified that a plane would be landing at March Air Reserve Base (MARB) carrying U.S. residents who had been in Wuhan, China where the original Covid-19 infections were detected. Upon repatriation of the flight, County Health officials had to determine the best means of protecting the public. Officials determined that quarantine mandates were appropriate for these and others returning to the County to prevent infection spread.

Unfortunately, others unknowing they were virus carriers, began to spread the virus all over the U.S. as they returned from abroad. Over the next several, federal, state, and local health officials navigated rapidly increasing infection and death rates worldwide. Mask mandates, closures of businesses, schools, and anything else considered non-essential were enforced, and in some cases, continue. Social distancing rules of maintaining at least 6 feet distance from anyone around you were implemented. In addition to the worldwide pandemic, some countries, including the United States, simultaneously began to struggle with supply chain shortages of essential items such as baby formula, among other things. Many of the lasting supply chain issues are still present today. The State of California and the City will end its COVID-19 emergency proclamations and emergency operation center activations, however, for many, the threat of other variants remains a constant143.

In 2009, Moreno Valley was impacted by the H1N1 influenza epidemic in which California proclaimed a State of Emergency (April 28, 2009). From April 23, 2009, until August 28, 2010, the California Department of Public Health reported 116 severe cases, 108 intensive care unit cases, and 41 deaths in Riverside County144. The public health emergency required 142 https://www.ruhealth.org/public-health/respiratory-viruses#rsv Retrieved February 2023 143 https://www.cdph.ca.gov/ Retrieved July 2022
144 https://www.cdph.ca.gov/ Retrieved July 2022
A.12.a
Packet Pg. 549 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 137 ends

the activation of the Moreno Valley Emergency Operations Center to track the epidemic; provide daily statistics to Riverside County Public Health on the status of our employees; to participate in regular conference calls; and to outreach information about appropriate precautions as well as provide information about vaccination. In today’s news, you often hear officials recalling this epidemic and reminding everyone that this and similar viruses can easily become problematic.

Pertussis (also known as whooping cough) is a highly contagious bacterial disease. People with pertussis experience severe coughing attacks that can last for months. During 2010, over 9,000 cases of pertussis were reported in California, including 10 infant deaths. Table 19-1 identifies disease outbreaks, including Influenza 145 and Pertussis, 146 in Riverside County.

TABLE 19-1: DISEASE OUTBREAKS IN THE MORENO VALLEY AREA Year Disease Number of Cases
2009-2010 Influenza (H1N1) 265
2010 Pertussis 461
2010-2011 Influenza 11
2011 Pertussis 176
2011-2012 Influenza 16
2012 Pertussis 31
2012-2013 Influenza 19
2013-2014 Influenza 66
2014-2015 Influenza 15
2020-Ongoing Covid-19 76,939 (as of 2/2023)
145 https://www.cdph.ca.gov/Programs/CID/DCDC/Pages/Immunization/Influenza.aspx Retrieved July 2022 146 https://www.cdph.ca.gov/Programs/CID/DCDC/Pages/Immunization/pertussis.aspx Retrieved July 2022 A.12.a
Packet Pg. 550 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 138 ends

19.1.2 PANDEMIC FLU/DISEASE PROFILE – PROBABILITY OF FUTURE EVENTS
The probability rating for this hazard is a 2, which means that there is between a 1% and 10% chance that it will occur within the next year. This does not account for the ongoing (existing) pandemic conditions caused by Covid-19.

19.2 PANDEMIC FLU/DISEASE VULNERABILITY – OVERVIEW/IMPACT The severity rating for this hazard is a 3, which means that there is a potential for critical damage, causing injuries and/or illnesses resulting in permanent disability, complete shutdown of critical facilities for two weeks and/or 25% to 49% of property is severely damaged.

Impact to Population and Structures: Due to the geographic extent of a pandemic, the entire population is vulnerable to illness, injuries, and casualties. There is no expected damage to structures; however, there could be a quarantine which would prevent people from coming or going from a particular structure or area.

Impact to Essential Facilities/Historical Sites: Essential facilities and/or historical sites could be affected if there was a quarantine initiated by Public Health. Essential functions may be limited if a large percentage of the workforce was unable to report to work, as we experienced during Covid-19.

Impact to Infrastructure: Travel will likely be restricted during a pandemic, with mandates for quarantine likely during disease outbreak periods.

Development Trends: Future development of buildings, structures, critical facilities, and infrastructure could be impacted if there were disease outbreaks requiring special treatment of development areas prior to building. New development is shown in Appendix C.

19.2.1 PANDEMIC FLU/DISEASE VULNERABILITY – POTENTIAL LOSS When the pandemic occurred, it affected everyone, not just in our city, but worldwide. The immediate and ongoing loss to income resulting from forced business closures, people’s inability to travel or generally move-about in public and spend money, weakened, and affected every aspect of life, including the local economy. As the pandemic continues, with new variants occurring, these impacts will continue for the foreseeable future.

Transportation, commerce, businesses small and large, and everything in between, has been negatively affected, and likely would be again during a pandemic. What is unknown is the cost for things not as tangible, such as school closures with online learning.

A.12.a
Packet Pg. 551 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 139 ends

PART 3

MITIGATION STRATEGY
A.12.a
Packet Pg. 552 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 140 ends

CHAPTER 20: MITIGATION STRATEGY

20.1 INTRODUCTION
Chapter 20 provides information about the City of Moreno Valley’s mitigation strategies, which is the blueprint for reducing losses from the identified hazards that may affect the city. This chapter will provide an assessment of Moreno Valley’s capabilities; identification of hazard mitigation strategies and status; analysis of mitigation actions; and National Flood Insurance Program compliance information. The city’s identified hazards, and their respective mitigation strategies, were developed using a Threat and Hazard Identification and Risk Assessment (THIRA) approach which includes probabilities, priorities, and potential severities.

20.2 CAPABILITY ASSESSMENT
The City of Moreno Valley’s capabilities for implementing mitigation strategies to reduce hazards that may affect the city include legal and regulatory capabilities, administrative and technical capabilities, fiscal capabilities and outreach and other capabilities.

Legal and Regulatory Capabilities: Moreno Valley formally adopts, regularly reviews, and updates regulatory policies such a general plan, along with implementing regulations such as zoning ordinances, subdivision ordinances, and specific plans. Table 20-1 is an example of regulatory capabilities that assist the City of Moreno Valley in its mitigation strategies.

TABLE 20-1: EXAMPLE OF REGULATORY CAPABILITIES
Regulatory Tool Comments
Floodplain ordinance
Municipal Code Title 8, Chapter 8.12 (Flood damage
prevention and implementation of National Flood
Insurance Program (NFIP)) includes flood damage
prevention and implementation of the national flood
insurance program (NFIP). Utilized for public outreach
and educational awareness.

Water conservation
ordinance
Municipal Code Title 9, Chapter 9.17 (Landscape and
Water efficiency requirements) addresses water
conservation. Utilized for public outreach and
educational awareness.

Stormwater ordinance
Municipal Code Title 8, Chapter 8.10(Storm
water/urban runoff management and discharge
controls). Utilized for public outreach and educational awareness.

A.12.a
Packet Pg. 553 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 141 ends

Wildfire ordinance
Municipal Code Title 6, Chapter 6.04 (Abatement of
Public Nuisances). Utilized for public outreach and
educational awareness.

Building Standards Code
Utilize Approved California Building Codes; Latest
adoption was July 1, 2022, with effective date of
January 1, 2023.

Fire and Safety Standards Utilize Approved 2016 Fire and Safety Standards; effective date of January 1, 2017.

Fire department ISO rating Rating: class 4 urban/9 rural Erosion or sediment control
program
Municipal Code Title 8, Chapter 8.21.160 (Erosion
Control) and Municipal Code Chapter 9.17.110
(Erosion Control/Slope Planting). Utilized for public
outreach and educational awareness.

Riverside County Flood
Control and Water
Conservation District
Master Drainage Plan
Three (3) master drainage plans (Sunnymead Area,
West End, Moreno). Utilized for public outreach and
educational awareness.

Regional Water Quality
Control Board Regulations
All proposed septic systems must comply; prevents
groundwater contamination
Santa Ana Watershed
Project Authority Water
Resources Plan
Protects water quality in the Santa Ana watershed.

Eastern Municipal Water District (which serves the City of Moreno Valley) is a part of the Santa Ana
Watershed.

National Pollutant
Discharge Elimination
System
Protects water resources from pollutants in runoff.

Capital Improvements Plan
The Capital Improvements Plan (CIP) is updated
annually. Utilized to develop project budget, priorities, and develop mitigation strategies.

Economic Development
Plan 2-year plan, 2022. Utilized for community profile.

Local Emergency
Operations Plan Emergency Operations Plan, March 2018
Several mitigation goals and objectives are included in the city’s General Plan to assist with mitigation efforts. A good example is Goal S-1, along with a few corresponding objectives and policies:

Goal S-1: Protect life and property from natural and humanmade hazards.

Policy S.1-1: Continue to restrict the development of habitable structures within AlquistPriolo Earthquake Fault Zones consistent with State law.

A.12.a
Packet Pg. 554 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 142 ends

Policy S.1-2: In areas of high liquefaction risk (see MoVal 2040: General Plan Map S-2), require that project proponents submit geotechnical investigation reports and demonstration that the project conforms to all recommended mitigation measures prior to City approval.

Policy S.1-14: Require new development in Very High Fire Hazard Severity Zones (VHFHSZs) to prepare a Fire Protection Plan that minimizes risks by: Assessing site-specific characteristics such as topography, slope, vegetation type, wind patterns etc.; Siting and designing development to avoid hazardous locations (e.g. through fire breaks) to the extent feasible; Incorporating fuel modification and brush clearance techniques in accordance with applicable fire safety requirements and carried out in a manner which reduces impacts to environmentally sensitive habitat to the maximum feasible extent; Using fire-safe building materials and design features, consistent with the adopted Municipal Code and Fire and Building Code standards; Using fire-resistant landscaping; and Complying with established standards and specifications for fuel modification, defensible space, access, and water facilities.

Goal S-2: Provide effective response to disasters and emergencies.

Policy S.2-1: Use the adopted Local Hazard Mitigation Plan and Emergency Operations Plan to guide actions and investments for emergency preparedness and response.

Another example of regulatory capabilities is Moreno Valley Municipal Code, Title 9, Chapter

9.17, which addresses water conservation and waste. Specifically, 9.17.160 (Landscape Water Use Efficiency Enforcement), states that the city will coordinate with the local water purveyors and encourage landscape water use efficiency such as tiered water rate structure; allocation-based conservation water pricing structure; irrigation audits and/or irrigation surveys.

As part of day-to-day business, the City is always exploring if there is a need to revise or enhance existing policies, procedures, processes, ordinances, plans, etc. Upon identified need of any such updates, revisions, or removals of such, the City, through documented processes and procedures would move accordingly to ensure such actions are completed.

The City takes proactive steps to regularly evaluate if existing capabilities, plans, procedures, strategies, etc. align with mitigation projects and activities. In the event there is a need for revisions, updates to these, or if new ones are necessary, the City will take appropriate steps to do so. Mitigation capabilities, whether administrative, fiscal, or other, and mitigation strategies must work together and as such, must be closely aligned to support each project and the overall mitigation program.

A.12.a
Packet Pg. 555 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 143 ends

Administrative/Technical Capabilities: Table 20-1.1 gives an example of the personnel responsible for activities related to mitigation for the City of Moreno Valley.

TABLE 20-1.1: EXAMPLE OF ADMINISTRATIVE AND TECHNICAL

CAPABILITIES
Personnel Resources Department/Position
Engineer with knowledge of land
development/land management practices
Public Works Department/City
Engineer
Engineer/Professional trained in
construction practices related to
buildings and/or infrastructure
Community Development
Department/ Building and Safety
Supervisor and/or Building Official
Engineer with an understanding of
natural hazards
Public Works Department /City
Engineer
Floodplain manager Public Works Department /City
Engineer
Personnel skilled in GIS applications Financial & Administrative Services Department/GIS Analyst
Building official Community Development
Department Building Official
Scientist familiar with local natural
hazards N/A
Emergency Manager Fire-Office of Emergency
Management Division Manager
Grant writers All Departments
Cost benefit/analysis staff
Financial and Administrative
Services and Public Works
Departments
A.12.a
Packet Pg. 556 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 144 ends

Example of Fiscal Capabilities: Table 20-1.2 shows an example of financial tools and resources that the city could potentially use to help fund mitigation activities.

TABLE 20-1.2: FISCAL MITIGATION CAPABILITIES
Financial Resources Comments
Community Development Block Grants Requires council approval Capital improvements project funding Requires council approval Authority to levy taxes for specific purposes Requires voter approval Fees for water, sewer, gas, or electric services Utility tax; voter approval Impact fees for new development Requires council approval Incur debt through general obligation bonds Requires voter approval Incur debt through special tax bonds Requires voter approval Hazard Mitigation Grant Program (HMGP) Apply when available & projects meet requirements
Building Resilient Communities (BRIC) Grants Apply when available & projects meet requirements
Climate Adaptation Grants Apply when available &
projects meet requirements
Drought Resilience Grants Apply when available &
projects meet requirements
Cal CAP Seismic Safety Grants Apply when available &
projects meet requirements
Other Federal, state, or local grants that may
become available
The City has a new grants
division dedicated to seeking
grant funding sources for allhazards mitigation and other City-related projects
An example of a successful grant mitigation award is a storm drain project the city applied for as a result of a presidentially declared winter storm disaster (DR-1731). The project is to install a storm drain system in the middle of the tract bounded by Redlands Boulevard and Merwin Street, from Alessandro Boulevard to Campbell Avenue, and connected to an existing open channel on the southwest corner of Redlands Boulevard and Brodiaea Avenue. The project would provide the Moreno Townsite area with 100-year storm level of protection. The lack of a proper storm drain system in the neighborhood has resulted in flooding events in almost every storm. The project is under design using grant funds.

Outreach and Other Capabilities
A.12.a
Packet Pg. 557 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 145 ends

The city provides fire safety classes, through the Community Emergency Response Team (CERT) program to the community several times a year and partners with businesses and local agencies to provide information outreach during community events. The city also participates in regional mass care and shelter planning and incorporates planning for access and functional needs individuals. In addition, the city has designated a cooling center if needed during a heat emergency and a heating center for cold, winter days. The Police Department and the California Department of Transportation have a plan to divert traffic from Highway in the event of major traffic accidents.

20.3 LOCAL HAZARD MITIGATION STRATEGIES AND PROGRESS
The next several pages will provide a summary of the mitigation strategies that were chosen for reducing the potential losses identified in the hazard risk assessment. Each mitigation strategy shows the priority ranking, responsible department/division/program, timeframe, funding, cost, and the status. In addition, the associated hazard(s) and relevant chapter from the LHMP is identified for each mitigation measure. The LHMP’s overall goals were identified in the Executive Summary in the beginning of the plan. They are:

1. Protect life, property, and the environment.

2. Provide public awareness.

3. Protect continuity of government; and

4. Improve emergency management, preparedness, collaboration, and outreach.

Priority Ranking: Several factors were considered to determine the mitigation priority ranking for each mitigation measure. The highest priority ranking was assigned to those mitigation measures that met three criteria: 1) greatest potential for protecting life and property; 2) greatest potential for maintaining critical city functions and operability following a disaster; and 3) achievability in terms of community support, and cost effectiveness. Each mitigation action is assigned a priority ranking as follows:

Critical: Most important goals/actions (may be short-term or long-term) High: To be implemented in the short-term future
Moderate: To be implemented when funding/resources become available.

Benefit/Cost Review: The benefits of proposed projects were weighed against costs as a part of the project prioritization process to determine if the proposed project should be ranked critical, high, or moderate. Where possible, an actual benefit/cost analysis ratio was provided.

Previous Mitigation Projects: Listed in the bullets below are the mitigation projects from the City’s 2017 LHMP that were completed. All incomplete projects from this plan are listed in the Mitigation Strategy section as projects still to be completed.

A.12.a
Packet Pg. 558 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 146 ends

• Replace the existing functionally obsolete SR-60/Redlands Avenue Overcrossing two-lane bridge with a four-lane bridge. Obtain funds and request Caltrans and City Council approval to perform environmental studies, design, and construction. This project from the 2017 plan is currently in the design phase. Refer to Mitigation Strategy 4.7 below for additional details.
• Replace the existing functionally obsolete SR-60/Theodore Avenue Overcrossing two-lane bridge with a four or six-lane bridge. Obtain funds and request Caltrans and City Council approval to perform environmental studies, design, and construction. This project from the 2017 plan is currently in the design phase. Refer to Mitigation Strategy 4.8 below for additional details. • Ensure that minimum building standards are implemented to safeguard life, limb, health, property, and public welfare by regulating and controlling the design, construction, quality of materials, use and occupancy, location and maintenance of all buildings and structures within the City of Moreno Valley. Adopt current California Building Standards Code, California Code of Regulations, Title 24, the California Building Code, California Mechanical Code, California Residential Code, California Plumbing Code, California Fire Code, and the California Electrical Code and adopting other regulations relating to Building and Fire Prevention requirements. This project from the 2017 plan was completed in 2017. Refer to Mitigation Strategy 6.14 below for additional details.
• For the flooding problems at Hubbard Street and Dunleavy Court neighborhood, the ultimate solution is to construct a storm drain system to collect flows from the upstream end, run off along Hubbard Street with inlets at Dunlavy Court and lateral streets and carry them to the existing Line H-1 on Ironwood Avenue in the City of Moreno Valley. This project from the 2017 plan was completed in 2019. Refer to Mitigation Strategy 6.13 below for additional details.
• Encourage public participation in the city’s hazard mitigation update process by designating a Hazard Mitigation web page in the Emergency Section of the city website that is specific to the City of Moreno Valley Local Hazard Mitigation Plan.

This project from the 2017 plan was completed during the update of that plan as well as during the update of this plan. Although complete, the concept of soliciting input from residents about the plan remains an ongoing effort.

Mitigation Strategies and Status: Beginning on the next page, grouped by identified hazard, is a summary of the city’s new and updated strategies that serve to mitigate the hazards that may affect the City of Moreno Valley.

A.12.a
Packet Pg. 559 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 147 ends

Each Mitigation Strategy and Status includes information about actual or potential funding sources. The City prioritizes seeking any available federal, state, or local mitigation grants including but not limited to: Building Resilient Communities (BRIC), Hazard Mitigation Grant Program (HMGP), Cal Trans grants, Utility Infrastructure grants, etc. It should also be noted that grants often have a very specific target capability they are looking to award for which may cause certain projects to be ineligible for a given grant year or grant cycle. Grants may also have target demographics, such as vulnerable populations, that they are looking to ensure the funds will directly benefit, which may or may not align with some projects given their geographic location. Other complexities of grant awards can be incomplete project funding. Many of the projects noted in this plan carry significant price tags that a single grant may not cover, rendering the funds unattainable if other supplemental funding is not immediately available. By listing the potential grant funding sources for each strategy, this does not imply that those are the only potential funding sources the City may seek, it only indicates that those are the most common, probable, or likely to be sought.

The Mitigation Strategies section also contains information about timeframe. The timeframe is generally a reference towards when the project was last included in the LHMP (if applicable). References to “ongoing” generally refer to the fact the project is not completed as of the time of this revision.

Status within this section generally refers to the overall project status. Some reveal assessed meaning they were assessed and evaluated during the 2017 plan and ongoing again, referring to the fact that the project remains ongoing.

A.12.a
Packet Pg. 560 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 148 ends

Mitigation Strategies
Chapter 4 – Earthquake

4.1 Mitigation
Strategy:

New Mitigation Strategy – Minimize the potential for loss of life and protect the community from the physical injury and property damage due to seismic ground shaking and secondary effects.

Require all new development projects, existing critical and essential facilities, and structures to comply with the City of Moreno Valley Municipal Code.

Priority: Critical
Responsible Dept: Building & Safety; Land Development
Timeframe: 2017- Ongoing
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities
Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? Utilize Approved California Building Codes; Latest adoption was July 1, 2022, adopting the 2022 Building Codes with effective date of January 1, 2023.

Does this capability require an update to support this
mitigation effort? No, Code updates are required every 3 years. No update needed specifically as a result of this strategy.

Assessed
C
Chapter 4 – Earthquake

4.2 Mitigation
Strategy:

Mitigation Update – Reduce fault rupture and liquefaction hazards through the identification and recognition of potentially hazardous conditions and areas as they relate to the San Jacinto fault zone and the high and very high liquefaction hazard zones.

Require all new development projects produce geologic studies and comply with mitigation for fault rupture hazards in accordance with the Alquist-Priolo Special Study Zones Act.

A.12.a
Packet Pg. 561 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 149 ends

Priority: Critical
Responsible Dept: Land Development; Planning
Timeframe: 2017 - Ongoing
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities
Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation effort utilizes approved California Building Codes.

Does this capability require an update to support this
mitigation effort? No
Assessed
C\
Chapter 4 – Earthquake

4.3 Mitigation
Strategy:

New Mitigation Strategy – Reduce potential for loss of life, property, and damage from earthquake events. Encourage public participation and usage of Cal OES’ “MyHazards” tool to discover hazards in their area (earthquake, flood, fire, and tsunami) and learn steps to reduce personal risk.

Priority: High
Responsible Dept: Office of Emergency Management
Timeframe: 2017 - Ongoing
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or
local grant opportunities
Plan Goal(s)*: 1, 2
A.12.a
Packet Pg. 562 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 150 ends

Supporting
Capability:

Status:

What identified capability supports this mitigation effort? Ongoing community outreach efforts about the LHMP and
general disaster preparedness outreach as part of the General Plan goals.

Does this capability require an update to support this
mitigation effort? Yes, LHMP must be updated every 5 years.

No update needed specifically as a result of this strategy.

Assessed
Chapter 4 – Earthquake

4.4 Mitigation
Strategy:

Mitigation Update – Protect historic buildings from geologic hazards. Evaluate historic buildings relative to the need for mitigation of geologic hazards, while weighing their historical value against the potential hazard of their collapse.

Priority: Moderate
Responsible Dept: Building & Safety
Timeframe: 2017 - Ongoing
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP), Climate
Adaptation Grants, Drought Resilience
Planning, CalCAP Seismic Safety, and
other Federal, State, or local grant
opportunities
Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? Building Standards
Code – Historical
Building Code and
Existing Building
Code
Utilize Approved California Building
Codes; Latest adoption was July 1,
2022, adopting the 2022 Building Codes
with effective date of January 1, 2023.

Does this capability require an update to support this
mitigation effort? Yes, Code update required every 3 years. No update needed specifically as a result of this strategy.

Assessed
A.12.a
Packet Pg. 563 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 151 ends

Chapter 4 – Earthquake

4.5 Mitigation
Strategy:

Mitigation Update – Replace the existing structurally deficient SR60/Moreno Beach Drive two-lane bridge with a six-lane bridge and complete the SR-60/Moreno Beach improvements. Obtain funds and request City Council approval to complete design and perform construction.

Priority: Critical
Responsible Dept: Capital Projects
Timeframe: November 2022 – November 2023
Funding/Cost: Federal, TUMF, Local Shares
secured/approx. $29 million
Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation assists in supporting the Capital Improvement Plan and Federal Highway Bridge Program.

Does this capability require an update to support this
mitigation effort? Yes, CIP is reviewed and updated
periodically. No update needed specifically as a result of this strategy.

Ongoing. The project could provide a new Moreno Beach
Drive/SR-60 bridge that meets current seismic
standards/requirements. The project could mitigate earthquake hazards by providing a new bridge that meets current seismic standards. The project is under the right-of-way phase. Design completion and construction funds are not identified.

Chapter 4 – Earthquake

4.6 Mitigation
Strategy:

Mitigation Update – Replace the existing structurally deficient SR60/Indian Street Overcrossing two-lane bridge with a two or fourlane bridge. Obtain funds and request Caltrans and City Council approval to perform environmental studies, design, and
construction.

Priority: Critical
A.12.a
Packet Pg. 564 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 152 ends

Responsible Dept: Capital Projects
Timeframe: 207 - Ongoing
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities
Supporting
Capability:

Plan Goal(s)*: 1
What identified capability supports this mitigation effort? This mitigation assists in supporting the Capital Improvement Plan and Federal Highway Bridge Program
Does this capability require an update to support this
mitigation effort? Yes, CIP is reviewed and updated
periodically. No update needed specifically as a result of this strategy.

Status: The project could provide a new Indian Street bridge that meets current seismic standards/requirements. The project is under preliminary study for timeline and funding opportunities.

Chapter 4 – Earthquake

4.7 Mitigation
Strategy:

Mitigation Update – Replace the existing functionally obsolete SR-60/Redlands Avenue Overcrossing two-lane bridge with a four-lane bridge. Obtain funds and request Caltrans and City Council approval to perform environmental studies, design, and construction.

Priority: Critical
Responsible Dept: Capital Projects
Timeframe: 2017 - Ongoing
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities
A.12.a
Packet Pg. 565 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 153 ends

Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation assists in supporting the Capital Improvement Plan and Federal Highway Bridge Program.

Does this capability require an update to support this
mitigation effort? Yes, CIP is reviewed and updated
periodically. No update needed specifically as a result of this strategy.

Ongoing. The project could provide a new Redlands Avenue bridge that meets current seismic standards/requirements. The project is under preliminary study for timeline and funding opportunities.

Chapter 4 – Earthquake

4.8 Mitigation
Strategy:

Mitigation Update – SR-60/World Logistics Center Parkway Project:

Replace the existing functionally obsolete SR-60/Theodore Avenue Overcrossing two-lane bridge with a four or six-lane bridge. Obtain funds and request Caltrans and City Council approval to perform environmental studies, design, and construction.

Priority: Critical
Responsible Dept: Capital Projects
Timeframe: January 2022 to December 2025 (tentative)
Funding/Cost: Funds identified for environmental studies and preliminary engineering; funds needed for
design and construction
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP), Climate
Adaptation Grants, Drought Resilience Planning,
CalCAP Seismic Safety, and other Federal,
State, or local grant opportunities
Plan Goal(s)*: 1
Supporting
Capability:

What identified capability supports this mitigation effort? This mitigation effort assists in supporting the Capital Improvement Plan and Federal Highway Bridge Program.

A.12.a
Packet Pg. 566 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 154 ends

Status:

Does this capability require an update to support this mitigation effort? Yes, CIP is reviewed and updated periodically. No update needed specifically as a result of this strategy.

In progress. The project could provide a new WLC/Theodore Street bridge that meets current seismic standards/requirements. The project is under environmental and preliminary engineering studies.

Chapter 4 – Earthquake

4.9 Mitigation
Strategy:

New Mitigation Strategy – Replace the existing functionally obsolete SR215/Cactus Avenue Overcrossing two-lane bridge with a four or six-lane bridge. Obtain funds and request Caltrans and City Council approval to perform environmental studies, design, and construction.

Priority: High
Responsible Dept: Capital Projects
Timeframe: January 2024 to December 2027 (tentative)
Funding/Cost: Funds identified for environmental studies and preliminary engineering; funds needed for design
and construction
City continues to explore BRIC, Hazard Mitigation
Grant Funding (HMGP), Climate Adaptation Grants,
Drought Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local grant
opportunities
Plan Goal(s)*: S-1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation assists in supporting the Capital Improvement Plan and Federal Highway Bridge Program
Does this capability require an update to support this mitigation effort? Yes, CIP is reviewed and updated periodically. No update needed specifically as a result of this strategy.

Assessed and Ongoing. The project could provide a new Cactus Avenue bridge that meets current seismic standards/requirements. The project is under environmental and preliminary engineering studies.

A.12.a
Packet Pg. 567 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 155 ends

Chapter 5 – Wildland and Urban Fires

5.1 Mitigation
Strategy:

Mitigation Update – Ensure that property in or adjacent to wildland areas is reasonably protected from wildland fire hazard, consistent with the maintenance of a viable natural ecology. Continue ongoing inspection programs for hazardous fuel and abatement on occupied and vacant parcels. Encourage programs to minimize the fire hazard, including but not limited to, the prevention of fuel build-up where wildland areas are adjacent to urban development. For new construction and significant tenant improvement, continue adherence to existing city Municipal Code standards.

Priority: High
Responsible Dept: Code Enforcement; Fire
Timeframe: 2017 - Ongoing
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP), Climate
Adaptation Grants, Drought Resilience
Planning, CalCAP Seismic Safety, and other
Federal, State, or local grant opportunities
Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? CA Fire Code; General Plan
Does this capability require an update to support this mitigation effort? Yes, codes are updated periodically, and General Plan is reviewed and updated periodically. No update needed specifically as a result of this strategy.

Assessed
Chapter 5 – Wildland and Urban Fires

5.2 Mitigation
Strategy:

Mitigation Update – Ensure that uses within urbanized areas are planned and designed consistent with applicable provisions of relevant regulatory policies. Ensure that ordinances, resolutions, and policies relating to urban development are consistent with the requirements of A.12.a
Packet Pg. 568 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 156 ends

acceptable fire safety, including requirements for smoke detectors, emergency water supply and automatic fire sprinkler systems.

Priority: Critical
Responsible Dept: Building & Safety; Fire
Timeframe: 2017 - Ongoing
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP), Climate
Adaptation Grants, Drought Resilience
Planning, CalCAP Seismic Safety, and other
Federal, State, or local grant opportunities
Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? Utilize Approved California Building Codes; Latest adoption was July 1, 2022, adopting the 2022 Building Codes with effective date of January 1, 2023.

Does this capability require an update to support this mitigation effort? Yes, Code update required every 3 years. No update needed specifically as a result of this strategy.

Assessed
Chapter 5 – Wildland and Urban Fires

5.3 Mitigation
Strategy:

Mitigation Update – Protect life and property from the potential fire hazard from improper or careless use, storage, treatment, and disposal of hazardous materials and waste. Require all land use applications and approvals to be consistent with applicable provisions of relevant regulatory policies.

Priority: Critical
Responsible Dept: Fire; Land Development; Riverside
County Department of Environmental
Health
Timeframe: 2017 - Ongoing
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
A.12.a
Packet Pg. 569 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 157 ends

Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities
Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? These efforts are supported by numerous laws, standards, and ordinances within each discipline. CA Fire Code outlines requirements for storage, disposal, etc. of waste which is supported and implemented by Fire Prevention and County Env.

Health.

Does this capability require an update to support this
mitigation effort? Yes, state, municipal, and local codes require periodic updating. No update needed specifically as a result of this strategy.

Assessed
Chapter 5 – Wildland and Urban Fires

5.4 Mitigation
Strategy:

Mitigation Update – Protect life and property from potential fire hazard by limiting development in safety zones according to identified land uses. Within the safety zones (e.g., Air Crash Hazard Zones and Clear Zones), residential uses shall not be permitted, and business uses shall be restricted to low intensity uses as defined in regulatory policies including the March Air Reserve Base Air Installation Compatible Use Zone Report, as amended from time to time.

Priority: High
Responsible Dept: Planning; March Joint Powers Authority (MJPA); March Air Reserve Base
Timeframe: 2017 - Ongoing
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP), Climate
Adaptation Grants, Drought Resilience
Planning, CalCAP Seismic Safety, and other
Federal, State, or local grant opportunities
Plan Goal(s)*: 1
Supporting
Capability:

What identified capability supports this mitigation effort? These efforts are supported by numerous laws, standards, and ordinances A.12.a
Packet Pg. 570 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 158 ends

Status:
within each discipline. City General Plan and ordinances support economic development which is further supported by Fire Prevention and Planning ordinances.

Does this capability require an update to support this mitigation effort? Yes, plans and ordinances must be periodically updated. No update needed specifically as a result of this strategy.

Assessed
Chapter 5 – Wildland and Urban Fires

5.5 Mitigation
Strategy:

New Mitigation Strategy – Identify areas of high fire risk. Work with GIS to identify and create a special wildfire layer to designate highrisk areas for use on the city’s website.

Priority: High
Responsible Dept: Fire; GIS
Timeframe: 2017 - Ongoing
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities
Plan Goal(s)*: 1, 2
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? CA Fire Code and CA Wildfire Mitigation Plans, as well as internal Fire Prevention standards and codes.

Does this capability require an update to support this mitigation effort? Yes, plans and codes require periodic review and updating.

No update needed specifically as a result of this strategy.

Assessed
Chapter 5 – Wildland and Urban Fires
A.12.a
Packet Pg. 571 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 159 ends

5.6 Mitigation
Strategy:

New Mitigation Strategy – Reduce potential for damage from fire.

Outreach and education to property owners about defensible space around structures and general abatement on vacant parcels.

Priority: High
Responsible Dept: Code Enforcement; Fire
Timeframe: 2017 - Ongoing
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities
Plan Goal(s)*: 1, 2
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? CA Fire Code and CA Wildfire Mitigation Plans, as well as internal Fire Prevention standards and codes.

Does this capability require an update to support this mitigation effort? Yes, plans and codes require periodic review and updating.

No update needed specifically as a result of this strategy.

Assessed
Chapter 5 – Wildland and Urban Fires

5.7 Mitigation
Strategy:

New Mitigation Strategy – Reduce response time for fire events.

Construct new four-lane bridge across Perris Valley Channel at Indian Street with some flood control improvements.

Priority: High
Responsible Dept: Capital Projects
Timeframe: 2023 to 2025 (tentative)
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP), Climate
Adaptation Grants, Drought Resilience
Planning, CalCAP Seismic Safety, and
A.12.a
Packet Pg. 572 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 160 ends

other Federal, State, or local grant
opportunities
Plan Goal(s)*: S-1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation assists in supporting the Capital Improvement Plan and Federal Highway Bridge Program.

Does this capability require an update to support this mitigation effort? Yes, CIP is reviewed and updated periodically. No update needed
specifically, as a result of this strategy.

Pending
Chapter 5 – Wildland and Urban Fires

5.8 Mitigation
Strategy:

New Mitigation Strategy – Reduce response time for fire events.

Construct two-lane road for missing section of Heacock Street connecting it down to Harley Knox.

Priority: High
Responsible Dept: Capital Projects
Timeframe: 2024-2025
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP), Climate
Adaptation Grants, Drought Resilience
Planning, CalCAP Seismic Safety, and
other Federal, State, or local grant
opportunities
Plan Goal(s)*: S-1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation assists in supporting the Capital Improvement Plan.

Does this capability require an update to support this mitigation effort? Yes, CIP is reviewed and updated periodically. No update needed specifically as a result of this strategy.

Assessed and pending
A.12.a
Packet Pg. 573 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 161 ends

Chapter 6 – Flooding

6.1 Mitigation
Strategy:

Mitigation Update – Reduce the potential from flood damage. Permit only acceptable land use development in 100-year floodplain. Review project proposals to ensure that they meet the accepted land use for the location. Require all land use applications and approvals to be consistent with applicable provisions of relevant regulatory policies.

Priority: High
Responsible Dept: Capital Projects, Land Development
Timeframe: 2017 - Ongoing
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP), Climate
Adaptation Grants, Drought Resilience
Planning, CalCAP Seismic Safety, and other
Federal, State, or local grant opportunities
Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation effort assists to support the National Flood Insurance Program floodplain ordinance
Does this capability require an update to support this mitigation effort? No
Ongoing
Chapter 6 – Flooding

6.2 Mitigation
Strategy:

Mitigation Update – Locate critical facilities, such as hospitals, fire stations, police stations, public administration buildings and schools outside of flood hazard areas. Review land use and flood maps to ensure proposed critical facilities are not within flood prone areas.

Priority: High
Responsible Dept: Capital Projects; Land Development
Timeframe: Ongoing
Funding/Cost: Current funding source & cost unknown
A.12.a
Packet Pg. 574 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 162 ends

City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP), Climate
Adaptation Grants, Drought Resilience
Planning, CalCAP Seismic Safety, and other
Federal, State, or local grant opportunities
Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation effort assists in supporting the National Flood Insurance Program flood ordinance.

Does this capability require an update to support this mitigation effort? No
Assessed and pending
Chapter 6 – Flooding

6.3 Mitigation
Strategy:

Mitigation Update – Improve storm and water flow. Design, construct and maintain street and storm drain flood control systems to accommodate 10 year and 100-year storm flows, respectively. Determine potential projects to mitigate known flood areas due to inadequate storm drain and flood control channels.

Priority: High
Responsible Dept: Capital Projects; Land Development
Timeframe: 2017 - Ongoing
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities
Plan Goal(s): 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation effort assists in supporting the Riverside County Flood Control and Water Conservation District Master Drainage Plan
Does this capability require an update to support this
mitigation effort? No
Pending project identification.

A.12.a
Packet Pg. 575 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 163 ends

Chapter 6 – Flooding

6.4 Mitigation
Strategy:

Mitigation Update – Improve/widen the existing 1.0 mile of incised earthen channel with concrete side walls and invert along Heacock Street from Cactus Avenue to Perris Valley Drain Lateral “A”.

Priority: High
Responsible Dept: Capital Projects
Timeframe: Completed
Funding/Cost: Joint venture with March Joint Powers
Authority (MJPA) , March Air Reserve
Base, and Riverside County Flood
Control and Water Conservation District;
$18.7 million
Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation effort assists in supporting the Riverside County Flood Control and Water Conservation District Master Drainage Plan
Does this capability require an update to support this
mitigation effort? No
In progress. The project, currently under design, could provide the area along Heacock Channel with 100-year storm level of protection. The existing channel currently cannot carry 10-year flood. Threat to residential areas and March Air Reserve Base properties. Flooding events threaten to undermine the road and underlying utilities, resulting in closures affecting ingress and egress of 700 residences and businesses and resulting in damages to March Air Reserve Base’s pump house and
transformer which interrupt their operations and emergency missions. A Flood Damage Reduction Study was completed in 2007 with a purpose of finding funding for the project.

Estimated Benefit-to-Cost Ratio*: 3.0
A.12.a
Packet Pg. 576 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 164 ends

Chapter 6 – Flooding

6.5 Mitigation
Strategy:

Mitigation Update – Improve/widen the existing 1.5 mile of incised earthen channel with concrete side walls and invert along Cactus Avenue from Elsworth Street to Heacock Street and connecting to Heacock Channel.

Priority: High
Responsible Dept: Capital Projects
Timeframe: N/A
Funding/Cost: Current funding source & estimated cost
$7.5m
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities
Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation effort assists in supporting the Riverside County Flood Control and Water Conservation District Master Drainage Plan
Does this capability require an update to support this
mitigation effort? No
Pending. The project could provide the area along Cactus Channel with 100-year storm level of protection capacity. The existing channel currently cannot carry 10-year flood. The existing Cactus Channel has limited capacities which result in overtopping and flooding to residential areas and March ARB properties. Flooding events threaten to undermine the road and underlying utilities, result in closures affecting ingress and egress of businesses, and result in damages to March ARB’s pump house and transformer which interrupt March ARB’s operations and emergency missions.

A Flood Damage Reduction Study was completed in 2007 with a purpose of finding funding for the project. This project was identified in 2004 multi-jurisdictional plan.

A.12.a
Packet Pg. 577 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 165 ends

Chapter 6 – Flooding

6.6 Mitigation
Strategy:

Mitigation Update – Reconstruct/upsize storm drain system on Redlands Boulevard from Alessandro Boulevard to south of Brodiaea Avenue and connect to the existing open channel on the southwest corner of Redland Boulevard and Brodiaea Avenue.

Priority: High
Responsible Dept: Capital Projects
Timeframe: 2023-2025
Funding/Cost: Hazard Mitigation Grant (DR-1731) and
Moreno Area Drainage Plan (ADP) fees;
Only available for the construction of Line
F-18 and F-19; $4 million
Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation effort assists in supporting the Riverside County Flood Control District and Water Conservation District Master Drainage Plan
Does this capability require an update to support this
mitigation effort? No
This project is in design and is slated for construction in 2024/2025.

Estimated Benefit-to-cost Ratio: 3.62**
**Benefit to cost ratio, which is an indicator, used in cost-benefit analysis.

Chapter 6 – Flooding

6.7 Mitigation
Strategy:

Mitigation Update – Install storm drain system in the San Timoteo Foothill Neighborhood, running along Carrie Lane, from Locust Avenue to Kalmia Avenue, then west along Kalmia Avenue to Pettit Street and to be tied into existing storm drain on Pettit Street.

Priority: High
Responsible Dept: Capital Projects
Timeframe: 2017 - ongoing
Funding/Cost: Hazard Mitigation Grant (DR-1810) and
Moreno ADP fees; total cost $2.5 million;
A.12.a
Packet Pg. 578 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 166 ends

Riv. Co. Flood Control will provide
funding for project, amount TBD
Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation effort assists in supporting the Riverside County Flood Control District and Water Conservation District Master Drainage Plan
Does this capability require an update to support this
mitigation effort? No
Ongoing. The project could provide the San Timoteo Foothill Neighborhood with 100-year storm level of protection. The lack of proper storm drain system in the neighborhood has resulted in flooding events in almost every storm season. The implementation of the project could mitigate flooding hazards to the San Timoteo Foothill Neighborhood, including damages to roadway and properties, closures of roadways, health issues, disruptions of traffic and public services.

Estimated Benefit-to-Cost Ratio: 6.26**
**Benefit to cost ratio, which is an indicator, used in cost-benefit analysis.

Chapter 6 – Flooding

6.8 Mitigation
Strategy:

Mitigation Update – Install storm drain systems at two locations on Sunnymead Boulevard; at east of Frederick Street from Hemlock Avenue to 100 feet south of Sunnymead Boulevard and Graham street from Hemlock Avenue to Sunnymead Boulevard and connected.

Priority: High
Responsible Dept: Capital Projects
Timeframe: N/A
Funding/Cost: Measure “A” for local match; total cost
$45m
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
A.12.a
Packet Pg. 579 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 167 ends

Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities million
Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation effort assists in supporting the Riverside County Flood Control District and Water Conservation District Master Drainage Plan
Does this capability require an update to support this
mitigation effort? No
Pending. The proposed project could provide the businesses, public and private properties along Sunnymead Boulevard with 100-year storm level of protection. The existing storm drain systems are inadequate which result in flooding events in almost every storm season. The preliminary engineering has been done for the project in the efforts of getting enough information for filling out future HMGP grant application when it becomes available.

Chapter 6 – Flooding

6.9 Mitigation
Strategy:

Mitigation Update – Install a storm drain system in Perris Boulevard from Perris Valley Storm Drain Lateral “A” to north of Suburban Lane in the Perris Valley ADP.

Priority: High
Responsible Dept: Capital Projects; Riverside County Flood Control and Water Conservation District
Timeframe: N/A
Funding/Cost: Perris ADP fees; $600,000
Plan Goal(s)*: 1
Supporting
Capability:

What identified capability supports this mitigation effort? This mitigation effort assists in supporting the Riverside County Flood Control District and Water Conservation District Master Drainage Plan
Does this capability require an update to support this
mitigation effort? No
A.12.a
Packet Pg. 580 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 168 ends

Status: The project could provide 100-year storm level of protection for the lands around Perris Boulevard south of Suburban Lane.

Projected to be completed in the next LHMP review period.

Chapter 6 – Flooding

6.10 Mitigation
Strategy:

New Mitigation Strategy – Install a storm drain system Line K-1 (Stage 1) in Ironwood Avenue west of Moreno Beach Drive to Pettit Street.

Priority: High
Responsible Dept: Capital Projects; Riverside County Flood Control and Water Conservation District
Timeframe: N/A
Funding/Cost: Moreno ADP fees; $2 million
Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation effort assists in supporting the Riverside County Flood Control District and Water Conservation District Master Drainage Plan
Does this capability require an update to support this
mitigation effort? No
Pending. The proposed project could provide 100-year storm level of protection for the area north of Ironwood Avenue between Moreno Beach Drive and Pettit Street.

Chapter 6 – Flooding

6.11 Mitigation
Strategy:

New Mitigation Strategy – Install a storm drain system Line K parallel with Moreno Beach Drive from Ironwood Avenue to north of Kalmia Avenue.

Priority: High
Responsible Dept: Capital Projects; Riverside County Flood Control and Water Conservation District
Timeframe: N/A
Funding/Cost: Moreno ADP fees; $4 million
A.12.a
Packet Pg. 581 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 169 ends

Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation effort assists in supporting the Riverside County Flood Control District and Water Conservation District Master Drainage Plan
Does this capability require an update to support this
mitigation effort? No
Pending. The project could provide 100-year storm level of protection for the area west of Moreno Beach Drive south of Locust Avenue.

Chapter 6 – Flooding

6.12 Mitigation
Strategy:

New Mitigation Strategy – For the flooding problems at Kitching Street-Ivy Lane Neighborhood, the ultimate solution is to construct a storm drain system to collect flows from the upstream end, run off along Kitching Street and carry them to the existing Line B-16 on Ironwood Avenue in the City of Moreno Valley. The proposed storm drain system includes approximate 2,900 feet of reinforced concrete pipes and lateral basins. The proposed storm drain system is identified as Line B-16 A within Sunnymead Master Drainage Plan.

Priority: High
Responsible Dept: Capital Projects; Riverside County Flood Control and Water Conservation District
Timeframe: N/A
Funding/Cost: Estimated cost $1.4m
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities
Plan Goal(s)*: 1
Supporting
Capability:

What identified capability supports this mitigation effort? This mitigation effort assists in supporting the Riverside County Flood Control District and Water Conservation District Master Drainage Plan
A.12.a
Packet Pg. 582 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 170 ends

Status:

Does this capability require an update to support this
mitigation effort? No
Pending. The project could provide 100-year storm level protection for the area of Kitching Street-Ivy Lane Neighborhood.

Chapter 6 – Flooding

6.13 Mitigation
Strategy:

New Mitigation Strategy – For the flooding problems at Hubbard Street and Dunleavy Court neighborhood, the ultimate solution is to construct a storm drain system to collect flows from the upstream end, run off along Hubbard Street with inlets at Dunlavy Court and lateral streets and carry them to the existing Line H-1 on Ironwood Avenue in the City of Moreno Valley.

Priority: High
Responsible Dept: Capital Projects; Riverside County Flood Control and Water Conservation District
Timeframe: 2017-2018 -COMPLETED
Funding/Cost: City of Moreno Valley and Riverside
County Flood Control and Water
Conservation District; $1.5 million
Plan Goal(s)*: 1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation effort assists in supporting the Riverside County Flood Control District and Water Conservation District Master Drainage Plan
Does this capability require an update to support this
mitigation effort? No
The project provided 100-year storm level protection for the area of Hubbard Street and Dunleavy Court Neighborhood.

Chapter 6 – Flooding

6.14 Mitigation
Strategy:

New Mitigation Strategy – Ensure that minimum building
standards are implemented to safeguard life, limb, health, property, and public welfare by regulating and controlling the design, construction, quality of materials, use and occupancy, location and maintenance of all buildings and structures within the City of Moreno Valley. Adopt current California Building Standards A.12.a
Packet Pg. 583 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 171 ends

Code, California Code of Regulations, Title 24, the California Building Code, California Mechanical Code, California Residential Code, California Plumbing Code, California Fire Code, California Existing Building Code, California Historical Code, California Green Code, California Energy Code, and the California Electrical Code and adopting other regulations relating to Building and Fire Prevention requirements.

Priority: Critical
Responsible Dept: Building & Safety; Fire
Timeframe: 2017 Completed
Funding/Cost: Current funding; cost unknown
Plan Goal(s)*: 1, 2
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? Utilize Approved California Building
Codes; Latest adoption was July 1,
2022, adopting the 2022 Building Codes
with effective date of January 1, 2023.

Does this capability require an update to support this
mitigation effort? Yes, Code update required every 3 years. No update needed specifically as a result of this strategy.

COMPLETED.

Chapter 6 – Flooding

6.15 Mitigation
Strategy:

New Mitigation Strategy – Reduce flooding with the construction of multiple flood control basins throughout the City.

Priority: High
Responsible Dept: Capital Projects
Timeframe: 2024 and ongoing
Funding/Cost: Current funding source & cost unknown
City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP), Climate
Adaptation Grants, Drought Resilience
Planning, CalCAP Seismic Safety, and
other Federal, State, or local grant
opportunities
A.12.a
Packet Pg. 584 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 172 ends

Plan Goal(s)*: S-1
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation effort assists in supporting the Riverside County Flood Control and Water Conservation District Master Drainage Plan Does this capability require an update to support this
mitigation effort? No
Assessed and pending.

Chapter 7 – Drought

7.1 Mitigation
Strategy:

New Mitigation Strategy – Decrease water usage on public and private parcels. Promote adoption of drought tolerant xeriscaping and potential incentives for landscaping replacement and continue removal and replacement of city-owned landscaping. Encourage contractors for residential and commercial developments to offer options promoting partnering agencies’ programs.

Priority: High
Responsible Dept: Facilities; Parks and Community
Services; Planning; Special Districts;
EMWD
Timeframe: Ongoing
Funding/Cost: City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities
Plan Goal(s)*: 2
Supporting
Capabilities:

Status:

What identified capability supports this mitigation effort? City General Plan and general Economic Development standards Does this capability require an update to support this
mitigation effort? Yes, City plans require periodic update and review. No update needed specifically as a result of this strategy.

Assessed
A.12.a
Packet Pg. 585 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 173 ends

Chapter 7 – Drought

7.2 Mitigation
Strategy:

New Mitigation Strategy – Decrease water usage on public and private parcels. Construct hardscape and xeriscape along streets within the City; replacing existing water-heavy landscaping.

Priority: High
Responsible Dept: Capital Projects
Timeframe: 2024 and ongoing
Funding/Cost: City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP), Climate
Adaptation Grants, Drought Resilience
Planning, CalCAP Seismic Safety, and
other Federal, State, or local grant
opportunities
Plan Goal(s)*: S-1
Supporting
Capabilities:

Status:

What identified capability supports this mitigation effort? This mitigation assists in supporting the Capital Improvement Plan Does this capability require an update to support this
mitigation effort? Yes, CIP plans must be reviewed and updated periodically. No update needed specifically as a result of this strategy.

Assessed
Chapter 8 – Landslide

8.1 Mitigation
Strategy:

New Mitigation Strategy – Reduce potential for loss of life, property, and damage of critical facilities from landslide damage.

Work with GIS to identify, inventory, and map critical facilities subject to landslides.

Priority: High
Responsible Dept: Building & Safety; Fire; GIS; Public
Works (Land Development)
Timeframe: Ongoing
Funding/Cost: City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
A.12.a
Packet Pg. 586 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 174 ends

Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities
Plan Goal(s)*: 1, 3, 4
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? City General Plan, Emergency Operations Plan, Natl. Flood Ins.

Does this capability require an update to support this
mitigation effort? Yes, General Plan and EOP require periodic review and updating. GIS maintains current maps of all hazards.

No update needed specifically as a result of this strategy.

Assessed
Chapter 8 – Landslide

8.2 Mitigation
Strategy:

New Mitigation Strategy – Increase public awareness of current and potential threats. Educate residents about potential erosion control resources and measures.

Priority: High
Responsible Dept: Office of Emergency Management
Timeframe: Ongoing
Funding/Cost: City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities
Plan Goal(s)*: 1, 2
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? City General Plan & Local Hazard Mitigation Plan
Does this capability require an update to support this
mitigation effort? Yes, Local Hazard Mitigation Plan must be updated every 5 years. No update needed specifically as a result of this strategy.

Assessed
A.12.a
Packet Pg. 587 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 175 ends

Chapter 9 – Insect Infestation

9.1 Mitigation
Strategy:

New Mitigation Strategy – Increase public awareness of current and potential threats. Educate residents about potential infestation control resources and measures.

Priority: High
Responsible Dept: Code Enforcement; Fire; Technology
Services;
Timeframe: Ongoing
Funding/Cost: City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities
Plan Goal(s)*: 1, 2
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? City General Plan & Local Hazard Mitigation Plan
Does this capability require an update to support this
mitigation effort? Yes, Local Hazard Mitigation Plan must be updated every 5 years. No update needed specifically as a result of this strategy.

Assessed
Chapter 9 – Insect Infestation

9.2 Mitigation
Strategy:

New Mitigation Strategy – Work with the Riverside County Department of Environmental Health to ensure continued
compliance with Vector Control Program for mosquito treatment citywide. Continue to inspect reports of stagnant water and work with property owners to educate and abate with county assistance as needed.

Priority: High
Responsible Dept: Code Enforcement; Riverside County
Department of Environmental Health
Timeframe: Ongoing
A.12.a
Packet Pg. 588 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 176 ends

Funding/Cost: City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities
Plan Goal(s)*: 1, 2
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? City General Plan & Local Hazard Mitigation Plan
Does this capability require an update to support this
mitigation effort? Yes, Local Hazard Mitigation Plan must be updated every 5 years. No update needed specifically as a result of this strategy.

Assessed
Chapter 10 – Extreme Weather

10.1 Mitigation
Strategy:

New Mitigation Strategy – Reduce potential impacts of extreme weather. Encourage public participation and usage of Cal OES’ “MyHazards” tool to discover hazards in their area (earthquake, flood, fire, and tsunami) and learn steps to reduce personal risk.

Priority: High
Responsible Dept: Office of Emergency Management
Timeframe: Ongoing; public education campaign is
ongoing
Funding/Cost: No direct costs
Plan Goal(s)*: 1, 2
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? City General Plan & Local Hazard Mitigation Plan
Does this capability require an update to support this
mitigation effort? Yes, Local Hazard Mitigation Plan must be updated every 5 years. No update needed specifically as a result of this strategy.

Assessed
A.12.a
Packet Pg. 589 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 177 ends

Chapter 10 – Extreme Weather

10.2 Mitigation
Strategy:

New Mitigation Strategy – Reduce potential impacts of extreme temperatures. Increase public awareness of extreme temperatures including shelter locations and cooling and warming centers.

Priority: High
Responsible Dept: Office of Emergency Management;
Parks & Community Services;
Technology Services, Media
Timeframe: Ongoing
Funding/Cost: No direct costs
Plan Goal(s)*: 1, 2
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? City General Plan & Local Hazard Mitigation Plan
Does this capability require an update to support this
mitigation effort? Yes, Local Hazard Mitigation Plan must be updated every 5 years. No update needed specifically as a result of this strategy.

Assessed
Chapter 11 – Severe Wind

11.1 Mitigation
Strategy:

New Mitigation Strategy – Reduce potential impacts and damage from severe wind events. Encourage public participation and usage of Cal OES’ MyHazards tool to discover hazards in their area (earthquake, flood, fire, and tsunami) and learn steps to reduce personal risk.

Priority: High
Responsible Dept: Office of Emergency Management
Timeframe: Ongoing
Funding/Cost: No direct costs
Plan Goal(s)*: 1, 2
Supporting
Capability:

What identified capability supports this mitigation effort? City General Plan & Local Hazard Mitigation Plan
A.12.a
Packet Pg. 590 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 178 ends

Status:

Does this capability require an update to support this
mitigation effort? Yes, Local Hazard Mitigation Plan must be updated every 5 years. No update needed specifically as a result of this strategy.

Assessed
Chapter 11 – Severe Wind

11.2 Mitigation
Strategy:

New Mitigation Strategy – Minimize potential impacts and damage from windy conditions. Encourage maintenance or
removal of overgrown or dead trees that may pose a falling hazard in windy conditions. Ensure city-owned trees are continued to be similarly maintained.

Priority: High
Responsible Dept: Parks and Community Services; Public
Works; Special Districts
Timeframe: Ongoing
Funding/Cost: Funding is provided via general funds
within dept. budget; When eligible, the
City applies for Hazard Mitigation
Grants (HMGP) and other climaterelated grants from Federal, state, and local providers such as Cal OES
Plan Goal(s)*: 1, 2, 3
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? Emergency Operations Plan and other City-related ordinances and mission areas.

Does this capability require an update to support this
mitigation effort? Yes, EOP must be updated every 5 years. No update needed specifically as a result of this strategy.

Assessed
Chapter 12 – Dam Failure/Inundation

12.1 Mitigation
Strategy:

New Mitigation Strategy – Increase public awareness of current and potential threats. Encourage public participation and usage of Cal OES’ MyHazards tool to discover hazards in their area A.12.a
Packet Pg. 591 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 179 ends

(earthquake, flood, fire, and tsunami) and learn steps to reduce personal risk.

Priority: High
Responsible Dept: Fire; Parks and Community Services
(Maintenance); Public Works
(Maintenance & Operations)
Timeframe: Ongoing
Funding/Cost: No direct costs
Plan Goal(s)*: 2
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? City General Plan & Local Hazard Mitigation Plan
Does this capability require an update to support this
mitigation effort? Yes, Local Hazard Mitigation Plan must be updated every 5 years. No update needed specifically as a result of this strategy.

Assessed
Chapter 13 – Pipeline

13.1 Mitigation
Strategy:

New Mitigation Strategy – Minimize potential damage to
infrastructure and pipelines. Work with pipeline owners and appropriate state and federal inspectors to promote and encourage continued compliance with inspection, maintenance, signage, and notification requirements in accordance with local, state, and federal regulations. Continue to require all development applications and approvals to be consistent with applicable provisions of relevant regulatory policies.

Priority: High
Responsible Dept: Land Development
Timeframe: Ongoing
Funding/Cost: City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, and other Federal, State, or local
grant opportunities
Plan Goal(s)*: 1, 2
A.12.a
Packet Pg. 592 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 180 ends

Supporting
Capability:

Status:

What identified capability supports this mitigation effort? City General Plan & Local Hazard Mitigation Plan
Does this capability require an update to support this
mitigation effort? Yes, Local Hazard Mitigation Plan must be updated every 5 years. No update needed specifically as a result of this strategy.

Assessed
Chapter 14 – Transportation

14.1 Mitigation
Strategy:

New Mitigation Strategy – Minimize potential transportation impacts. Continue to utilize existing city and intersection cameras to monitor and adjust traffic flows. Continue traffic and speed studies with enforcement.

Priority: High
Responsible Dept: Police; Public Works (Transportation) Timeframe: Ongoing
Funding/Cost: City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, Cal Trans Program grants, and
other Federal, State, or local grant
opportunities
Plan Goal(s)*: S-2
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? Capital Improvement Plan
Does this capability require an update to support this
mitigation effort? Yes, the CIP is reviewed and updated as required. No update needed specifically as a result of this strategy.

Assessed
A.12.a
Packet Pg. 593 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 181 ends

Chapter 14 – Transportation

14.2 Mitigation
Strategy:

New Mitigation Strategy – Minimize potential transportation impacts. Continue to adjust intersection signal timing during peak periods or around special events. Develop and implement a Commercial Vehicle Enforcement program.

Priority: High
Responsible Dept: Police; Public Works (Transportation) Timeframe: Ongoing
Funding/Cost: City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, Cal Trans Program grants and
other Federal, State, or local grant
opportunities
Plan Goal(s)*: S-2
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? Capital Improvement Plan
Does this capability require an update to support this
mitigation effort? Yes, the CIP is reviewed and updated as required. No update needed specifically as a result of this strategy.

Assessed
Chapter 14 – Transportation

14.3 Mitigation
Strategy:

New Mitigation Strategy – Minimize potential transportation impacts. Develop citywide intersection signal timing coordination with adjustment capability. Upgrade and refurbish Transportation Management Center equipment and software.

Priority: High
Responsible Dept: Transportation
Timeframe: 2023 and ongoing
Funding/Cost: City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
A.12.a
Packet Pg. 594 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 182 ends

Resilience Planning, CalCAP Seismic
Safety, Cal Trans Program grants and
other Federal, State, or local grant
opportunities
Plan Goal(s)*: S-2
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? This mitigation assists in supporting the Capital Improvement Plan Does this capability require an update to support this
mitigation effort? Yes, the CIP requires periodic review and update. No update needed specifically as a result of this strategy.

Assessed
Chapter 15 – Power Failure

15.1 Mitigation
Strategy:

New Mitigation Strategy – Minimize potential impact from power failures. Promote and encourage compliance with state- and utilitymandated conservation efforts during peak periods.

Priority: High
Responsible Dept: MVU
Timeframe: Ongoing
Funding/Cost: City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, Utility Infrastructure grants via So
Cal Edison, and other Federal, State, or
local grant opportunities
Plan Goal(s)*: 2
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? California Public Utilities Code General Orders, Wildfire Mitigation Plan
Does this capability require an update to support this
mitigation effort? Yes, both require periodic or annual updates.

No update needed specifically as a result of this strategy.

Assessed
A.12.a
Packet Pg. 595 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 183 ends

Chapter 15 – Power Failure

15.2 Mitigation
Strategy:

New Mitigation Strategy – Minimize potential impact from power failures. Ensure continued compliance with California Public Utilities Commission orders and rules regarding required line clearance where vegetation exists and encroaches on power lines.

Priority: High
Responsible Dept: MVU
Timeframe: Ongoing
Funding/Cost: City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, Utility Infrastructure grants via So
Cal Edison, and other Federal, State, or
local grant opportunities
Plan Goal(s)*: 1, 3
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? California Public Utilities Code General Orders, Wildfire Mitigation Plan
Does this capability require an update to support this
mitigation effort? Yes, both require periodic or annual updates.

No update needed specifically as a result of this strategy.

Assessed
Chapter 16 – Hazardous Materials Accident

16.1 Mitigation
Strategy:

New Mitigation Strategy – Reduce potential for loss of life, property, and environmental damage from hazardous materials impacts. Ensure continued compliance with materials code and local, state, federal regulations and relevant regulatory policies regarding generation and storage of hazardous materials.

Priority: High
A.12.a
Packet Pg. 596 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 184 ends

Responsible Dept: Fire Prevention; Riverside County
Department of Environmental Health
Timeframe: Ongoing
Funding/Cost: City continues to explore BRIC, Hazard
Mitigation Grant Funding (HMGP),
Climate Adaptation Grants, Drought
Resilience Planning, CalCAP Seismic
Safety, Utility Infrastructure grants via So
Cal Edison, and other Federal, State, or
local grant opportunities
Plan Goal(s)*: 1, 2
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? CA Fire Code, General Plan
Does this capability require an update to support this
mitigation effort? Yes, the Fire Code and General Plan require periodic review and update. No update needed specifically as a result of this strategy.

Assessed
Chapter 17 – Terrorist Attack

17.1 Mitigation
Strategy:

Mitigation Update – Minimize opportunities for crime found in the present and future build environment, and by creating and maintaining a high level of community awareness and support of crime prevention. Promote the establishment of neighborhood and business watch programs to encourage community participation in the patrol of neighborhood areas, and increased awareness of any suspicious activity.

Priority: High
Responsible Dept: Police
Timeframe: Ongoing
Funding/Cost: The City regularly pursues law
enforcement-related grant opportunities
through various public sectors
Plan Goal(s)*: 1, 2, 4
Supporting
Capability:

What identified capability supports this mitigation effort? Riverside County Sheriff general mission; Neighborhood Watch Program
A.12.a
Packet Pg. 597 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 185 ends

Status:

Does this capability require an update to support this
mitigation effort? No
Assessed
Chapter 18 – Civil Unrest

18.1 Mitigation
Strategy:

New Mitigation Strategy – Minimize opportunities for crime found in the present and future build environment, and by creating and maintaining a high level of community awareness and support of crime prevention. Promote the establishment of neighborhood and business watch programs to encourage community participation in the patrol of neighborhood areas, and increased awareness of any suspicious activity.

Priority: High
Responsible Dept: Police
Timeframe: Ongoing
Funding/Cost: The City regularly pursues law
enforcement-related grant opportunities
through various public sectors
Plan Goal(s)*: 1, 2, 4
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? Riverside County Sheriff general mission; Neighborhood Watch Program
Does this capability require an update to support this
mitigation effort? No
Assessed
Chapter 19 – Pandemic Flu/Disease

19.1 Mitigation
Strategy:

Mitigation Update – Collaborate and coordinate with the Riverside County Public Health Department to support community awareness to prevention and protections from communicable disease and/or pandemic flu. Assist in providing information to the public regarding prevention and protection against communicable A.12.a
Packet Pg. 598 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 186 ends

disease and/or pandemic flu. Increase public awareness of current and potential threats.

Priority: Moderate
Responsible Dept: Office of Emergency Management;
Technology Services; Riverside
University Health Systems - Public
Health
Timeframe: 2017 - Ongoing
Funding/Cost: The City received federal pass-through
funds to support worldwide pandemic
and will continue to pursue Federal,
state, and local grant funding
opportunities through Cal OES, CDPH,
CDC, and others.

Plan Goal(s)*: 1, 2, 3, 4
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? Local Hazard Mitigation Plan and City General Plan
Does this capability require an update to support this
mitigation effort? Yes, Local Hazard Mitigation Plan must be updated every 5 years. No update needed specifically as a result of this strategy.

Assessed
Chapter 19 – Pandemic Flu/Disease

19.2 Mitigation
Strategy:

Mitigation Update – Minimize risk and threat of infection or disease. Encourage and promote participation in seasonal immunization efforts.

Priority: High
Responsible Dept: Office of Emergency Management
Timeframe: 2017 - Ongoing
Funding/Cost: The City received federal pass-through
funds to support worldwide pandemic
and will continue to pursue Federal,
state, and local grant funding
opportunities through Cal OES, CDPH,
CDC, and others.

A.12.a
Packet Pg. 599 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 187 ends

Plan Goal(s)*: 1, 2, 3, 4
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? N/A Does this capability require an update to support this
mitigation effort? No. There are several local and regional programs that are utilized to encourage community
immunizations. Grants funds are sought through various
channels through partner agencies and non-profits.

Assessed
All Hazards
AH.1
Mitigation
Strategy:

Mitigation Update – Provide a satellite EOC traffic management center LED or LCD wall display and computers to better manage emergency operations from the EOC and provide a backup to the city’s traffic management center.

Priority: High
Status: Carryover from City’s 2017 LHMP
Responsible Dept: Capital Projects; Traffic Engineering Timeframe: 2016-2017
Funding/Cost: FY10 EMPG grant $25K; ongoing costs
are supported by the City currently;
however, the City is always pursing BRIC,
Hazard Mitigation Grant Funding
(HMGP), Climate Adaptation Grants,
Drought Resilience Planning, CalCAP
Seismic Safety, Infrastructure grants via
other Federal, State, or local grant
opportunities
Plan Goal(s)*: 3, 4
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? Capital Improvement Plan, General Plan
Does this capability require an update to support this
mitigation effort? No update needed specifically as a result of this strategy.

COMPLETED
A.12.a
Packet Pg. 600 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 188 ends

All Hazards
AH.2 Mitigation
Strategy:

Mitigation Update – Encourage public participation in the city’s hazard mitigation update process by designating a Hazard Mitigation web page in the Emergency Section of the city website that is specific to the City of Moreno Valley Local Hazard Mitigation Plan.

Priority: Moderate
Responsible Dept: Office of Emergency Management;
Technology Services - Media
Timeframe: 2017 COMPLETED / Ongoing
Funding/Cost: General funded
Plan Goal(s)*: 1, 2, 4
Supporting
Capability:

Status:

What identified capability supports this mitigation effort? Local Hazard Mitigation Plan
Does this capability require an update to support this
mitigation effort? Yes, LHMP is updated every 5 years. No update needed specifically as a result of this strategy.

Completed/Ongoing
All Hazards
AH.3 Mitigation
Strategy:

Mitigation Update – Promote a greater community awareness and understanding of the effects of natural and man-made hazards. Provide FEMA Community Emergency Response Team Training regularly to the community.

Priority: High
Responsible Dept: Office of Emergency Management
Timeframe: 2017 - Ongoing
Funding/Cost: Homeland Security Grant Program and
General Fund
Plan Goal(s)*: 1, 2, 4
Supporting
Capability:

What identified capability supports this mitigation effort? Local Hazard Mitigation Plan
A.12.a
Packet Pg. 601 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 189 ends

Status:

Does this capability require an update to support this
mitigation effort? Yes, LHMP must be updated every 5 years.

No update needed specifically as a result of this strategy.

Continuing and ongoing.

All Hazards
AH.4 Mitigation
Strategy:

New Mitigation Strategy – Provide emergency preparedness presentations to service clubs, homeowner’s associations, and other organizations to enhance preparedness.

Priority: Moderate
Responsible Dept: Office of Emergency Management
Timeframe: 2017 - Ongoing
Funding/Cost: General fund
Plan Goal(s)*: 1, 2, 4
Supporting
Strategy:

Status:

What identified capability supports this mitigation effort? This is an ongoing effort by emergency management and is achieved through various avenues.

Does this capability require an update to support this
mitigation effort? No
Assessed

20.4 NATIONAL FLOOD INSURANCE PROGRAM
The last component of the city’s mitigation strategy is participation in the National Flood Insurance Program. The City of Moreno Valley has participated in the NFIP since June 16, 1987.

The NFIP aims to reduce the impact of flooding on private and public structures. It does so by providing affordable insurance to property owners and by encouraging communities to adopt and enforce floodplain management regulations.

The NFIP seeks to minimize the socio-economic impact of disasters by encouraging and promoting the purchase and retention of general risk insurance, but also flood insurance, specifically, to homes and businesses located in Special Flood Hazard Areas (SFHA). The land area covered by the floodwaters of the base flood is the SFHA on NFIP maps.

A.12.a
Packet Pg. 602 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 190 ends

Per City Municipal Code, the City of Moreno Valley regulates new development and substantial improvement to existing structures in the SFHA or to build safely above Base Flood Elevation (BFE) to reduce damage to new construction. The program is based on mapping areas of flood risk and requiring local implementation to reduce flood damage primarily requiring the elevation of structures above the BFE including revising the Flood Insurance Rate Maps (FIRMs) by processing Letters of Map Revisions (LOMR) with FEMA prior to issuance of certificates of occupancy. The city completes the NFIP Biennial Report and returns that information to FEMA in a timely manner. There have been no negative issues from participating in the NFIP.

In 2008, the city updated its Municipal Code, adopting the April 19, 2017 Flood Insurance Study (FIS), Flood Boundary and Floodway Maps (FBFM) and attendant FIRMs. The FIS, FBFM and FIRM are on file at Public Works Department, Land Development Division.

The City of Moreno Valley requires Flood Plain Development Permits for all construction or other development, including manufactured homes, within any SFHA. Flood Insurance may be required in these zones as a condition of loan or grant assistance. Elevation Certificates are required as part of the Development Permit, issuance of a building permit and issuance of final occupancy. The Elevation Certificate is a form published by FEMA and required to be maintained and filed in Moreno Valley as a participating community in the NFIP.

The Moreno Valley Master Drainage Plan was updated in early 2015 and adopted by City Council on October 13, 2015. The Master Drainage plan proposes the construction of detention basins, debris basins, open channels, and a network of underground storm drains.

When implemented, it shall provide flood protection from the 100-year storm event. In addition, it also serves as a planning guide for the location and sizing of local drainage facilities to be constructed by developers and others within the area.

Discretionary projects located in an SFHA are required, as a condition of approval, to construct necessary storm drain improvements per the city’s Master Drainage Plan and process a Letter of Map Revision, thus removing property from SFHA.

Repetitive Loss Properties: There are no repetitive loss properties.

Other Data Used to Regulate Flood Hazard Areas: The City of Moreno Valley utilizes past Hydrology/Hydraulic (H/H) studies prepared by the Riverside County Flood Control and Water Conservation District, developers and others prepared in the past in areas known for shallow flooding within Zone X to determine finish floor elevations for proposed structures.

Community Rating System (CRS): Beginning October 1, 1991, the City of Moreno Valley has maintained its member participation in the CRS and is rated at a Class 8. FEMA conducts NFIP-CRS field verifications on a five-year cycle to determine if communities A.12.a
Packet Pg. 603 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 191 ends

remain in compliance with NFIP regulations. The City of Moreno Valley’s most recent field verification was conducted in April 2017 and found the city to be in compliance. The NFIPCRS is a voluntary incentive program that recognizes and encourages community floodplain management activities that exceed the minimum NFIP requirements. As a result, flood insurance premium rates are discounted by 10% for SFHA zones and 5% for non-SFHA zones to reflect the reduced flood risk resulting from the community actions. These efforts are aligned with the three goals of the CRS:

1. Reduce flood damages to insurable property.

2. Strengthen and support the insurance aspects of the NFIP; and

3. Encourage a comprehensive approach to floodplain management.

A.12.a
Packet Pg. 604 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 192 ends

APPENDIX A

ABBREVIATIONS, ACRONYMS, AND INITIALISMS
A.12.a
Packet Pg. 605 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 193 ends

Abbreviations, Acronyms, and Initialisms
ADP Area Drainage Plan
APZ Accident Potential Zone
BFE Base Flood Elevation
BIA Business In Action
CALTRANS California Department of Transportation
CERT Community Emergency Response Team
CFR Code of Federal Regulations
CRC Community and Recreation Center
CRS Community Rating System
DNA Deoxyribonucleic Acid
DR Disaster
E-MAIL Electronic Mail
EMWD Easter Municipal Water Department
EOC Emergency Operations Center
FBFM Flood Boundary and Floodway Maps
FBI Federal Bureau of Investigations
FEMA Federal Emergency Management Agency
FIRM Flood Insurance Rate Map
FIS Flood Insurance Study
GIS Geological Information Systems
H/H Hydrology/Hydraulic
HIV Human Immunodeficiency Virus
HMGP Hazard Mitigation Grant Program
H.R. House of Representatives
IRC Inland Regional Center
LHMP Local Hazard Mitigation Plan
LOMR Letter of Map Revisions
MMscfd Million Standard Cubic Feet per Day
MVTV-3 Moreno Valley Cable Television Channel
MVU Moreno Valley Utility
N/A Not Available
NFIP National Flood Insurance Program
NFPA National Fire Protection Association
NWS National Weather Service
A.12.a
Packet Pg. 606 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 194 ends

OEM Office of Emergency Management
PLS Pressure Limiting Station
PSIG Per Square Inch Gage
RCC Riverside Community College
RCFC/WCD Riverside County Flood Control and Water Conservation District
RDA Redevelopment Agency
RUHS Riverside University Health System
RV Recreational Vehicle
SBA Small Business Administration
SDG&E San Diego Gas & Electric
SFHA Special Flood Hazard Area
SME Subject Matter Expert
SONGS San Onofre Nuclear Generating System
SR State Route
TBD To Be Determined
THIRA Threat and Hazard Identification and Risk Assessment TUMF Transportation Uniform Mitigation Fee
UP Union Pacific
USGS United States Geological Services
WCD Wastewater Control District
A.12.a
Packet Pg. 607 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 195 ends

APPENDIX B

MEETING DOCUMENTATION
A.12.a
Packet Pg. 608 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 196 ends

Executive Team - LHMP Planning Committee Kickoff Meeting – July 6, 2022 A.12.a
Packet Pg. 609 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 197 ends

EXECUTIVE TEAM LHMP BRIEFING & KICKOFF MEETING – JULY 6, 2022 A.12.a
Packet Pg. 610 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 198 ends

City LHMP Planning Committee Kickoff Meeting – July 28, 2022

SIGN IN SHEET

NAMES ARE

REDACTED FOR PRIVACY
A.12.a
Packet Pg. 611 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 199 ends

City LHMP Planning Committee Kickoff Meeting – July 28, 2022

TIMELINE
A.12.a
Packet Pg. 612 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 200 ends

Operational Area Planning Committee Meeting – Agenda July 28, 2022 A.12.a
Packet Pg. 613 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 201 ends

OPERATIONAL AREA PLANNING COMMITTEE MEETING – SIGN IN SHEET – JULY 28 2022
A.12.a
Packet Pg. 614 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 202 ends

OA MJLHMP STEERING COMMITTEE MEETING – AUGUST 3, 2022
A.12.a
Packet Pg. 615 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 203 ends

OA MJLHMP Steering Committee Sign in Sheet – August 3, 2022 A.12.a
Packet Pg. 616 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 204 ends

LHMP Process Review Meeting with County EMD – August 8, 2022 A.12.a
Packet Pg. 617 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 205 ends

OA MJLHMP Workshop Agenda– August 17, 2022
A.12.a
Packet Pg. 618 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 206 ends

OA MJLHMP Workshop Sign in Sheet– August 17, 2022
A.12.a
Packet Pg. 619 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 207 ends

Non-Profit & Faith-based Organizations Presentation – August 25, 2022 (Sign in sheet not available)
A.12.a
Packet Pg. 620 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 208 ends

City CERT Training Flyer – September 9-11, 2022
A.12.a
Packet Pg. 621 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 209 ends

City CERT Training Agenda – September 9-11, 2022
A.12.a
Packet Pg. 622 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 210 ends

City CERT Training Sign in Sheet– September 9-11, 2022

NAMES ARE

REDACTED FOR PRIVACY
A.12.a
Packet Pg. 623 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 211 ends

A.12.a
Packet Pg. 624 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 212 ends

CITY EMPLOYEE CERT CLASS AGENDA – SEPTEMBER 21-22, 2022 A.12.a
Packet Pg. 625 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 213 ends

A.12.a
Packet Pg. 626 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 214 ends

CITY EMPLOYEE CERT CLASS SIGN IN SHEET – SEPTEMBER 21-22, 2022

NAMES ARE

REDACTED FOR PRIVACY
A.12.a
Packet Pg. 627 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 215 ends

OA MJLHMP Steering Committee Agenda – October 5, 2022
A.12.a
Packet Pg. 628 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 216 ends

OA MJLHMP Steering Committee Sign in Sheet – October 5, 2022 A.12.a
Packet Pg. 629 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 217 ends

City CERT Class Flyer – October 14-16, 2022
A.12.a
Packet Pg. 630 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 218 ends

City CERT Class Agenda – October 14-16, 2022
A.12.a
Packet Pg. 631 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 219 ends

City CERT Class Sign in Sheet – October 14-16, 2022

NAMES ARE

REDACTED FOR PRIVACY
A.12.a
Packet Pg. 632 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 220 ends

Public LHMP Input & Feedback Meetings Social Media Post -October 5, 2022 A.12.a
Packet Pg. 633 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 221 ends

Public Meeting #1 Advertisement– October 11, 2022
A.12.a
Packet Pg. 634 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 222 ends

PUBLIC MEETING #1 AGENDA – OCTOBER 11, 2022
A.12.a
Packet Pg. 635 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 223 ends

PUBLIC MEETING #1 SIGN IN SHEET – OCTOBER 11, 2022

NAMES ARE

REDACTED FOR PRIVACY
A.12.a
Packet Pg. 636 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 224 ends

Public Meeting #2 Advertisement – October 13, 2022
A.12.a
Packet Pg. 637 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 225 ends

PUBLIC MEETING #2 AGENDA – OCTOBER 13, 2022
A.12.a
Packet Pg. 638 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 226 ends

PUBLIC MEETING #2 SIGN IN SHEET – OCTOBER 13, 2022

NAMES ARE

REDACTED FOR PRIVACY
A.12.a
Packet Pg. 639 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 227 ends

Public LHMP Website & Feedback Survey Landing Page
LAUNCHED SEPTEMBER 15, 2022 – REMAINS OPEN
A.12.a
Packet Pg. 640 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 228 ends

PUBLIC LHMP WEBSITE FEEDBACK SURVEY QUESTIONS
A.12.a
Packet Pg. 641 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 229 ends

PUBLIC LHMP WEBSITE FEEDBACK SURVEY QUESTIONS – CONT.

A.12.a
Packet Pg. 642 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 230 ends

Public LHMP Website Feedback Survey Results
(as of January 23, 2022)
A.12.a
Packet Pg. 643 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 231 ends

Chamber of Commerce Business in Action Meeting Agenda – September 14, 2022 (sign in sheet not available)
A.12.a
Packet Pg. 644 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 232 ends

OA MJLHMP Steering Committee Agenda – January 4, 2023
A.12.a
Packet Pg. 645 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 233 ends

OA MJLHMP Steering Committee Sign in Sheet – January 4, 2023 A.12.a
Packet Pg. 646 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 234 ends

Community Input Flyer for Posting in City Facilities February 8 th through March 8,
2022
A.12.a
Packet Pg. 647 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 235 ends

City Website Landing Page for Community Input on 2022 Draft LHMP - Posted February 8, 2023
City Social Media Post for LHMP Community Input on 2022 Draft Plan – Posted to FB & Instagram (not available) on February 9, 2023
Facebook
A.12.a
Packet Pg. 648 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 236 ends

Instagram
A.12.a
Packet Pg. 649 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 237 ends

APPENDIX C

CITY OF MORENO VALLEY

FUTURE DEVELOPMENT
A.12.a
Packet Pg. 650 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 238 ends

A.12.a
Packet Pg. 651 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 239 ends

A.12.a
Packet Pg. 652 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 240 ends

A.12.a
Packet Pg. 653 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 241 ends

A.12.a
Packet Pg. 654 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING Moreno Valley Hazard Mitigation Plan
Revised: December 2022

Page 242 ends

New Projects Map with Commercial Development Activity, New Housing and Planned New Housing – Revised January 2022
A.12.a
Packet Pg. 655 Attachment: CITY OF MORENO VALLEY LHMP_APRIL 19 2023_FINAL (6264 : RESOLUTION ADOPTING RESOLUTION NO. 2023-XX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

MORENO VALLEY, CALIFORNIA, ADOPTING THE CITY OF

MORENO VALLEY LOCAL HAZARD MITIGATION PLAN AS

REQUIRED BY THE FEDERAL DISASTER MITIGATION
AND COST REDUCTION ACT OF 2000.

WHEREAS, the Disaster Mitigation and Cost Reduction Act of 2000 (DMA 2000) was signed into law on October 30, 2000, by the President of the United States; and WHEREAS, the DMA 2000 requires all jurisdictions to be covered by a Local Hazard Mitigation Plan to be eligible for Federal Emergency Management pre and postdisaster funds; and WHEREAS, the City of Moreno Valley is concerned about mitigating potential losses from natural disasters before they occur, and the Local Hazard Mitigation Plan identifies potentials hazards, potential losses, and potential mitigation measures to limit losses; and
WHEREAS, the Office of Emergency Management for the City of Moreno Valley has updated the Local Hazard Mitigation Plan for 2022 that is specific for Moreno Valley.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MORENO VALLEY, CALIFORNIA, DOES HEREBY RESOLVE AS FOLLOWS:

1. Resolution 2017-55 and all prior enactments on the same subject are hereby repealed.

2. The City of Moreno Valley Local Hazard Mitigation Plan 2022 is adopted effective immediately.

SIGNATURE PAGE FOLLOWS
A.12.b
Packet Pg. 656 Attachment: RESOLUTION NO. 2023-XX_LHMP [Revision 1] (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL HAZARD Moreno Valley Local Hazard Mitigation Plan
Resolution No. 2023-____
Date Adopted: May __, 2023
APPROVED AND ADOPTED this ___ day of May, 2023.
___________________________
Mayor of the City of Moreno Valley
ATTEST:
____________________________
City Clerk
APPROVED AS TO FORM:
____________________________
City Attorney
A.12.b
Packet Pg. 657 Attachment: RESOLUTION NO. 2023-XX_LHMP [Revision 1] (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL HAZARD Moreno Valley Local Hazard Mitigation Plan
Resolution No. 2023-____
Date Adopted: May __, 2023

RESOLUTION JURAT

STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.

CITY OF MORENO VALLEY )
I, ______________, City Clerk of the City of Moreno Valley, California, do hereby certify that Resolution No. __________ was duly and regularly adopted by the City Council of the City of Moreno Valley at a regular meeting thereof held on the _____ day of______, ______ by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
(Council Members, Mayor Pro Tem and Mayor)
___________________________________

CITY CLERK
(SEAL)
A.12.b
Packet Pg. 658 Attachment: RESOLUTION NO. 2023-XX_LHMP [Revision 1] (6264 : RESOLUTION ADOPTING THE CITY OF MORENO VALLEY LOCAL HAZARD Report to City Council
ID#6267 Page 1
TO: Mayor and City Council
Mayor and City Council Acting in its Capacity as
President and Members of the Board of Directors of the
Moreno Valley Community Services District (CSD)
FROM: Jeremy Bubnick, Parks & Community Services Director AGENDA DATE: May 16, 2023
TITLE: RECOMMENDATION TO AWARD AN INDEPENDENT

CONTRACTOR AGREEMENT FOR LANDSCAPE

MAINTENANCE OF CITY PARKS, CITY LANDSCAPED

FACILITIES AND LANDSCAPED AQUEDUCT AREAS TO
MERCHANT’S LANDSCAPE SERVICES INC.

RECOMMENDED ACTION
Recommendations:

1. Approve the Agreement for Professional Landscape Maintenance Services (“Agreement”) with Merchants Landscape Services, Inc., 1505 S. Lyon Street, Santa Ana, CA 92705, and waive any and all minor irregularities, to provide landscape and irrigation maintenance services for city parks, city landscaped facilities and landscaped aqueducts for a period of five years at a total not-toexceed amount of $6,503,403.74.

2. Authorize the City Manager/Executive Director of the Moreno Valley Community Services District to execute the Agreement with Merchants Landscape Services, Inc. and subsequent amendments to the Agreement, in accordance with its terms, subject to the approval of the City Attorney provided sufficient funding appropriations and program approvals have been granted by the City Council and CSD Board; and,

3. Authorize the City Manager/Executive Director of the Moreno Valley Community Services District to approve issuance of annual purchase orders in accordance with the amounts listed on the Parks Landscape Maintenance Table II in the Fiscal Impact Section of this report for each of the five (5) consecutive fiscal years terms commencing with FY 2023/2024 of the Agreement subject to funds A.13
Packet Pg. 659

Page 2 ends

available in the City Council and Moreno Valley Community Services District Board (CSD) approved Operating Budget.

SUMMARY
This report recommends award of a Professional Landscape Maintenance Services Agreement to Merchants Landscape Services, Inc. (the “Contractor”) to provide for routine regular (base maintenance) landscape maintenance services of City parks, City landscaped facilities and landscaped aqueducts located within the City. The Agreement is for a five-year term commencing July 1, 2023 and is subject to an annual 5% inflationary adjustment.

Funding for the landscape maintenance services of City parks, City landscape facilities and landscaped aqueducts located within the City, is provided through an allocation of funds that includes various special financing districts for parks and general fund allocations that have been previously approved by the City Council as part of the adopted budget.

DISCUSSION
Maintenance of the public landscaping is performed by licensed and insured landscape contractors. The contractors are selected through a competitive Request for Proposal (RFP) process every five-years, consistent with the City’s Procurement Policy. Public Contract Code 22002, the Uniform Public Construction Cost Accounting Act (Municipal Code 3.12.300), allows the use of the RFP procurement process for landscape maintenance services.

On March 15, 2023, an RFP (RFP #2023-005) for landscape maintenance services was issued using the City’s electronic bid and vendor management system (PlanetBids).

Thirty (30) vendors were notified, and eight (8) eight responses were received by the RFP due date of 2:00 p.m. on April 7, 2023,
In order to determine the best overall value to the City, all proposals were evaluated independently by representatives from the Parks and Landscape Services Division who served as the City’s selection panel for review to recommend award. Proposals were evaluated on the RFP’s requested information. Proposers (vendors) that submitted proposal responses were evaluated on the proposer’s 1) ability to provide the services, 2) qualifications and certifications in accordance with accepted standards, 3) references from other municipalities/public agencies where similar services have been provided, and 4) pricing.

The overall evaluation grading by the City’s selection panel recommends 1) awarding the Agreement to Merchants Landscape Services, Inc., waiving any and all minor irregularities, 2) authorizing the City Manager/Executive Director of the Moreno Valley Community Services District (CSD) to execute the Agreement, and 3) authorizing the City Manager/ Executive Director of the CSD to approve all future amendments in A.13
Packet Pg. 660

Page 3 ends

accordance with the terms of the Agreement subject to the approval of the City Attorney. Such amendments shall only be entered into provided they are within the authorized not-to-exceed amount and provided sufficient funding appropriations and program approvals have been granted by the City Council and CSD Board. 4) authorizing the City Manager/Executive Director of the CSD to amend the Agreement to allow for adjustments in additional work services, as may be necessary, without a delay in service.

This action meets the Strategic Plan Priorities by managing and maximizing Moreno Valley’s public infrastructure to ensure an excellent quality of life, develop and implement innovative, cost-effective infrastructure maintenance programs, public facilities management strategies, and capital improvement programming and project delivery.

ALTERNATIVES

1. Approve the Agreement for Landscape Maintenance Services with Merchants Landscape Services, Inc. and related recommended actions as presented in this staff report. Staff recommends this alternative to provide uninterrupted maintenance of the parks and public landscaped facilities.

2. Do not approve the Agreement. Staff does not recommend this alternative as it may cause an interruption in the maintenance of the parks and public landscaped facilities. Additional costs may be incurred to obtain another landscape maintenance contractor with no guarantee that a more qualified contractor can be found at a better cost.

FISCAL IMPACT
Maintenance costs to provide park and public facilities landscape maintenance services is funded through a combination of special financing districts for parks and landscaped aqueducts and a general fund allocation to maintain landscaped areas associated with public facilities. Costs for these services are included in the City’s & CSD’s FY 2023/24 Operating Budget and are allocated in the amounts as shown in the following table.

A.13
Packet Pg. 661

Page 4 ends

The term of the Agreement is five years, provided funding appropriations and program approvals have been granted by the City Council and CSD Board each fiscal year. The Agreement is subject to an annual Consumer Price Index (CPI) inflation adjustment, at the discretion of the City and with appropriate City Council and CSD Board funding and program approvals. The following table is the not-to-exceed amount of the five-year Agreement (including an estimate for annual CPI adjustments).

NOTIFICATION
The RFP was posted on the City’s bid portal (PlanetBids) on April 15, 2023. PlanetBids notified 30 vendors about this RFP.

A.13
Packet Pg. 662

Page 5 ends

PREPARATION OF STAFF REPORT
Prepared By: Department Head Approval:

Sharon Goodale Jeremy Bubnick
Management Analyst Parks and Community Services Director Concurred By: Concurred By:

Patty Yhuit Dan Monto
Senior Management Analyst Parks and Landscape Services Division Manager

CITY COUNCIL GOALS
Positive Environment. Create a positive environment for the development of Moreno Valley's future.

Community Image, Neighborhood Pride and Cleanliness. Promote a sense of community pride and foster an excellent image about our City by developing and executing programs which will result in quality development, enhanced neighborhood preservation efforts, including home rehabilitation and neighborhood restoration.

CITY COUNCIL STRATEGIC PRIORITIES

1. Economic Development

2. Public Safety

3. Library

4. Infrastructure

5. Beautification, Community Engagement, and Quality of Life

6. Youth Programs
See the Discussion section above for details of how this action supports the City Council’s Strategic Priorities.

ATTACHMENTS
To view large attachments, please click your “bookmarks” on the left hand side of this document for the necessary attachment.

1. Agreement - Merchants Landscape Services Inc

2. Agreement attachment - Updated

APPROVALS
Budget Officer Approval ✓ Approved . 5/05/23 8:55 AM
City Attorney Approval ✓ Approved .

City Manager Approval ✓ Approved . 5/05/23 9:12 AM
A.13
Packet Pg. 663

Page 1 of 13 ends

City of Moreno Valley

AGREEMENT FOR ON-SITE AND/OR PROFESSIONAL SERVICES
This Agreement is made by and between the City of Moreno Valley and Moreno Valley Community Services District, California, a municipal corporation, with its principal place of business at 14177 Frederick Street, Moreno Valley, CA 92552, hereinafter referred to as the “City”, and Merchants Landscape Services, Inc., a Landscape Maintenance Services Corporation, with its principal place of business at 1510 Lyon Street, Santa Ana, CA 92705, hereinafter referred to as the “Contractor,” based upon City policies and the following legal citations:

RECITALS
A. Government Code Section 53060 authorizes the engagement of persons to perform special services as independent contractors;
B. Contractor desires to perform and assume responsibility for the provision of professional landscape maintenance services required by the City based on the terms and conditions set forth in this Agreement. Contractor represents that it is experienced in providing professional landscape maintenance services, is registered with the Department of Industrial Relations (DIR) and is licensed in the State of California, if applicable; C. City desires to engage Contractor to render such services for landscape maintenance services as set forth in this Agreement;
D. The public interest, convenience, necessity and general welfare will be served by this Agreement; and
E. This Agreement is made and entered into effective the date the City signs this Agreement.

TERMS
I. CONTRACTOR INFORMATION:

Contractor’s Name:

Address:

City, State, Zip
Business Phone:

Business Email:

Business License Number:

Federal Tax I.D. Number:

Merchants Landscape Services, Inc.
1505 S. Lyon Street
Santa Ana, CA 92705
1-800-645-4881
[email protected]
23168
95-4725606
A.13.a
Packet Pg. 664 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT

Page 2 of 13 ends

2. CONTRACTOR SERVICES, FEES, AND RELEVANT DATES:

A. The Contractor’s scope of service is described in Exhibit “A” attached hereto and incorporated herein by this reference.

B. The City’s responsibilities, other than payment, are described in Exhibit “B” attached hereto and incorporated herein by this reference.

C. Payment terms are provided in Exhibit “C” attached hereto and incorporated herein by this reference.

D. The term of this Agreement shall be through June 30, 2028, and as provided in Exhibit "D" attached hereto and incorporated herein by this reference, unless terminated earlier as provided herein. The City acknowledges that it will not unreasonably withhold approval of the Contractor's requests for extensions of time in which to complete the work required. The Contractor shall not be responsible for performance delays caused by others or delays beyond the Contractor's reasonable control (excluding delays caused by non-performance or unjustified delay by Contractor, his/her/its employees, or subcontractors), and such delays shall extend the time for performance of the work by the Contractor.

E. The Contractor's Proposal is provided in Exhibit "E" attached hereto and incorporated herein by this reference.

3. STANDARD TERMS AND CONDITIONS:

A. Control of Work. Contractor is solely responsible for the content and sequence of the work, and will not be subject to control and direction as to the details and means for accomplishing the anticipated results of services. The City will not provide any training to Contractor or his/her/its employees.

B. Intent of Parties. Contractor is, and at all times shall be, an independent contractor and nothing contained herein shall be construed as making the Contractor or any individual whose compensation for services is paid by the Contractor, an agent or employee of the City, or authorizing the Contractor to create or assume any obligation or liability for or on behalf of the City, or entitling the Contractor to any right, benefit, or privilege applicable to any officer or employee of the City.

C. Subcontracting. Contractor may retain or subcontract for the services of other necessary contractors with the prior written approval of the City. Payment for such services shall be the responsibility of the Contractor. Any and all subcontractors shall be subject to the terms and conditions of this Agreement, with the exception that the City shall have no obligation to pay for any subcontractor services rendered. Contractor shall be responsible for paying prevailing wages where required by law [See California Labor Code Sections 1770 through 1777.7].

A.13.a
Packet Pg. 665 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT

Page 3 of 13 ends

D. Conformance to Applicable Requirements. All work prepared by Contractor shall be subject to the approval of City.

E. Substitution of Key Personnel. Contractor has represented to City that certain key personnel will perform and coordinate the services under this Agreement.

Should one or more of such personnel become unavailable, Contractor may substitute other personnel of at least equal competence upon written approval of City. In the event that City and Contractor cannot agree as to the substitution of key personnel, City shall be entitled to terminate this Agreement for cause.

As discussed below, any personnel who fail or refuse to perform the services in a manner acceptable to the City, or who are determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the project or a threat to the safety of persons or property, shall be promptly removed from the project by the Contractor at the request of the City. The key personnel for performance of this Agreement are as follows: Patrick Healy, Inland Regional Manager and Cesar Trujillo Branch Manager.

F. City’s Representative. The City hereby designates the City Manager/Executive Director of the Moreno Valley Community Service District, or his or her designee, to act as its representative for the performance of this Agreement (“City’s Representative”). Contractor shall not accept direction or orders from any person other than the City’s Representative or his or her designee.

G. Contractor’s Representative. Contractor hereby designates Patrick Healy, Inland Regional Manager, or his or her designee, to act as its representative for the performance of this Agreement (“Contractor’s Representative”).

Contractor’s Representative shall have full authority to represent and act on behalf of the Contractor for all purposes under this Agreement. The Contractor’s Representative shall supervise and direct the services, using his or her best skill and attention, and shall be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the services under this Agreement.

H. Legal Considerations. The Contractor shall comply with applicable federal, state, and local laws in the performance of this Agreement. Contractor shall be liable for all violations of such laws and regulations in connection with services.

If the Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Contractor shall be solely responsible for all costs arising therefrom. Contractor shall defend, indemnify and hold City, its officials, directors, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

I. Standard of Care; Performance of Employees. Contractor shall perform all services under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and A.13.a
Packet Pg. 666 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT

Page 4 of 13 ends

maintains that it is skilled in the profession necessary to perform the services.

Contractor warrants that all employees and subcontractor shall have sufficient skill and experience to perform the services assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the services and that such licenses and approvals shall be maintained throughout the term of this Agreement. Any employee of the Contractor or its subcontractors who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the project, a threat to the safety of persons or property, or any employee who fails or refuses to perform the services in a manner acceptable to the City, shall be promptly removed from the project by the Contractor and shall not be re-employed to perform any of the services or to work on the project.

J. Contractor Indemnification. Contractor shall indemnify, defend and hold the City, the Moreno Valley Housing Authority, and the Moreno Valley Community Services District (CSD), their officers, agents and employees harmless from any and all claims, damages, losses, causes of action and demands, including, without limitation, the payment of all consequential damages, expert witness fees, reasonable attorney’s fees and other related costs and expenses, incurred in connection with or in any manner arising out of Contractor’s performance of the work contemplated by this Agreement and this Agreement. Acceptance of this Agreement signifies that the Contractor is not covered under the City’s general liability insurance, employee benefits, or worker’s compensation. It further establishes that the Contractor shall be fully responsible for such coverage. Contractor’s obligation to indemnify shall survive expiration or termination of this Agreement, and shall not be restricted to insurance proceeds, if any, received by the City, the Moreno Valley Housing Authority, and the CSD, and their officers, agents and employees.

K. Additional Indemnity Obligations. Contractor shall defend, with counsel of City’s choosing and at Contractor’s own cost, expense and risk, any and all claims, suits, actions or other proceedings of every kind covered by Section “J” that may be brought or instituted against City, the Moreno Valley Housing Authority, and the CSD, and their officers, agents and employees. Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City, the Moreno Valley Housing Authority, and the CSD, and their officers, agents and employees as part of any such claim, suit, action or other proceeding. Contractor shall also reimburse City for the cost of any settlement paid by City, the Moreno Valley Housing Authority, and the CSD, and their officers, agents and employees as part of any such claim, suit, action or other proceeding. Such reimbursement shall include payment for City’s attorney’s fees and costs, including expert witness fees. Contractor shall reimburse City, the Moreno Valley Housing Authority, and the CSD, and their officers, agents and employees for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided.

L. CalPERS Indemnity. To the fullest extent permitted by law, in addition to obligations set forth in this section, in the event that any person providing A.13.a
Packet Pg. 667 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT

Page 5 of 13 ends

services under this Agreement is determined by a court of competent jurisdiction or CalPERS to be eligible for enrollment in CalPERS as an employee of the City, to the fullest extent of the law, CONTRACTOR shall indemnify, defend, and hold harmless City for any costs and expenses incurred by City, including without limitation, payment that City is required as a result to make to CalPERS, whether in the form of employee and/or employer contributions, taxes, or any similar obligations, as well as for the payment of any penalties and interest.

M. CalPERS Participation. As set forth in this Agreement and in the Request for Qualifications, City has an obligation to treat all persons working for or under the direction of CONTRACTOR as an independent Contractor of City and agents and employees of CONTRACTOR, and not as agents or employees of City. CONTRACTOR and City acknowledge and agree that City participates in a defined benefit plan (“CalPERS”), and that it is possible that CalPERS may find that persons providing services pursuant to this Agreement are employees of City and should be registered with the CalPERS as employees of City.

N. CalPERS Retiree Disclosure. CONTRACTOR hereby expressly agrees to clearly and conspicuously disclose to City in writing any and all persons working for CONTRACTOR who are retirees under the California Public Employees’ Retirement System (CalPERS) whom receives a monthly CalPERS retirement allowance, and whom are, subject to City approval, assigned by CONTRACTOR to provide services to City under the Agreement, prior to such person performing any services hereunder. Nothing herein shall be deemed or interpreted to limit a CalPERS retiree’s obligations under applicable law, rules or regulations.

O. Joint Cooperation. In the event that CalPERS initiates an inquiry that includes examination of whether individuals providing services under this Agreement to City are City’s employees, CONTRACTOR shall within five days and share all communications and documents from CalPERS that it may legally share. In the event that either CONTRACTOR or City files an appeal or court challenge, CONTRACTOR and City each agree to cooperate with each other in responding to the inquiry and any subsequent administrative appeal or court challenge of an adverse determination
P. Insurance Requirements. Throughout the life of this AGREEMENT , the Contractor Vendors shall pay for and maintain in full force and effect all insurance as required.

If at any time during the life of this AGREEMENT or any extension, Contractor or any of its subcontractors fail to maintain any required insurance in full force and effect, all services and work under this AGREEMENT shall be discontinued immediately, and all payments due or that become due to Contractor shall be withheld until notice is received by CITY that the required insurance has been restored to full force and effect and that the premiums therefore have been paid for a period satisfactory to CITY. Any failure to maintain the required insurance shall be sufficient cause for CITY to terminate A.13.a
Packet Pg. 668 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT

Page 6 of 13 ends

this AGREEMENT. No action taken by CITY pursuant to this section shall in any way relieve Contractor of its responsibilities under this AGREEMENT.

The phrase "fail to maintain any required insurance" shall include, without limitation, notification received by CITY that an insurer has commenced proceedings, or has had proceedings commenced against it, indicating that the insurer is insolvent.

The fact that insurance is obtained by Contractor shall not be deemed to release or diminish the liability of Contractor, including, without limitation, liability under the indemnity provisions of this AGREEMENT. The duty to indemnify CITY shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by Contractor. Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of Contractor, its principals, officers, agents, employees, persons under the supervision of Contractor, suppliers, invitees, consultants, sub-consultants, subcontractors, or anyone employed directly or indirectly by any of them.

Upon request of CITY, Contractor shall immediately furnish CITY with a complete copy of any insurance policy and associated documentation required under this AGREEMENT, including all endorsements, with said copy certified by the underwriter to be a true and correct copy of the original policy. This requirement shall survive expiration or termination of this AGREEMENT Where determined applicable by the CITY, Contractor will comply with the following insurance requirements at its sole expense. Insurance companies shall be rated (A Minus: VII-Admitted) or better in Best's Insurance Rating Guide and shall be legally licensed and qualified to conduct business in the State of California.

Minimum Scope of Insurance: Coverage shall be at least as broad as:
1) The most current version of Insurance Services Office (ISO) Commercial General Liability Coverage Form CG 00 01 covering on an “occurrence” basis, which shall include insurance for "bodily injury," "property damage" and "personal and advertising injury" with coverage for premises and operations, products and completed operations, and contractual liability. 2) The most current version of Insurance Service Office (ISO) Business Auto Coverage Form CA 00 01, which shall include coverage for all owned, hired, and non-owned automobiles or other licensed vehicles (Code 1- Any Auto).
3) Workers' Compensation insurance as required by the State of California, California Labor Code and Employer's Liability Insurance, with Statutory Limits, and Employer’s Liability Insurance with limits of no less than $1,000,000 per accident for bodily injury or disease.

A.13.a
Packet Pg. 669 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT

Page 7 of 13 ends

4) Professional Liability (Errors and Omissions) insurance appropriate to Contractor 's profession.

Minimum Limits of Insurance:
a. General Liability Insurance. Without limiting the generality of the forgoing, to protect against loss from liability imposed by law for damages on account of bodily injury, including death, and/or property damage suffered or alleged to be suffered by any person or persons whomever, resulting directly or indirectly from any act or activities of the VENDOR, sub-contractor, or any person acting for the VENDOR or under its control or direction. Such insurance shall be maintained in full force and effect throughout the terms of this AGREEMENT and any extension thereof in the minimum amounts provided below:
• $1,000,000 per occurrence for bodily injury and property damage • $1,000,000 per occurrence for personal and advertising injury • $2,000,000 aggregate for products and completed operations • $2,000,000 general aggregate
b. Automobile Liability
• $1,000,000 per accident for bodily injury and property damage c. Employer's Liability (Worker's Compensation)
• $1,000,000 each accident for bodily injury
• $1,000,000 disease each employee
• $1,000,000 disease policy limit
d. The Workers' Compensation insurance policy: In such amounts as will fully comply with the laws of the State of California and which shall indemnify, insure and provide legal defense for both the VENDOR and the CITY, HA, and CSD against any loss, claim or damage arising from any injuries or occupational diseases happening to any worker employed by the VENDOR in the course of carrying out this AGREEMENT. Workers' Compensation insurance policy is to contain, or be endorsed to contain, the following provision: VENDOR and its insurer shall waive any right of subrogation against City of Moreno Valley, CSD, Housing Authority and each of their officers, officials, employees, agents and volunteers.
e. Professional Liability (Errors and Omissions): Limits of no less than $1,000,000 per occurrence or claim, $2,000,000 aggregate. f. Endorsements. Unless otherwise specified hereunder, each insurance policy required herein shall be with insurers possessing a Best’s rating of no less than A,VII and shall be endorsed with the following specific language:
• The insurer waives all rights of subrogation against the City, its appointed officials, officers, employees or agents.

A.13.a
Packet Pg. 670 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT

Page 8 of 13 ends

Other Insurance Provisions: The General Liability, Automobile Liability and Workers Compensation insurance policies are to contain, or be endorsed to contain, the following provisions:
a. City of Moreno Valley, the City of Moreno Valley Community Services District, the Moreno Valley Housing Authority and each of their officers, officials, employees, agents and volunteers are to be covered as additional insureds.
b. The coverage shall contain no special limitations on the scope of protection afforded to CITY, CSD, Housing Authority and each of their officers, officials, employees, agents and volunteers.

All polices of insurance required hereunder shall be endorsed to provide that the coverage shall not be cancelled, non-renewed, reduced in coverage or in limits except after 30 calendar day written notice by certified mail, return receipt requested, has been given to the CITY. Upon issuance by the insurer, broker, or agent of a notice of cancellation, nonrenewal, or reduction in coverage or in limits, Contractor shall furnish the CITY with a new certificate and applicable endorsements for such policy(ies). In the event any policy is due to expire during the work to be performed for the CITY, Contractor shall provide a new certificate, and applicable endorsements, evidencing renewal of such policy not less than 15 calendar days prior to the expiration date of the expiring policy.

Acceptability of Insurers: All policies of insurance required hereunder shall be placed with an insurance company(ies) admitted by the California Insurance Commissioner to do business in the State of California and rated not less than "A- VII" in Best's Insurance Rating Guide; or authorized by the City Manager or designee.

Verification of Coverage: Contractor shall furnish CITY with all certificates(s) and applicable endorsements effecting coverage required hereunder. All certificates and applicable endorsements are to be received and approved by the City Manager/Executive Director of the Moreno Valley Community Services District Board or designee prior to CITY'S execution of this AGREEMENT and before work commences. The following applicable endorsements will be required:

1. Additional Insured endorsement for ongoing operations, completed operations and primary & non-contributory endorsement for general liability coverage

2. Additional Insured endorsement for auto liability coverage

3. Waiver of Subrogation for workers compensation coverage Q. Intellectual Property. Any system or documents developed, produced or provided under this Agreement, including any intellectual property discovered or developed by Contractor in the course of performing or otherwise as a result of its work, shall become the sole property of the City unless explicitly stated otherwise in this Agreement. The Contractor may retain copies of any and all material, including drawings, documents, and specifications, produced by the Contractor in performance of this Agreement. The City and the Contractor agree that to the extent permitted by law, until final approval by the City, all A.13.a
Packet Pg. 671 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT

Page 9 of 13 ends

data shall be treated as confidential and will not be released to third parties without the prior written consent of both parties.

R. Entire Agreement. This Agreement constitutes the entire agreement between the parties. There are no understandings, agreements, or representations of warranties, expressed or implied, not specified in this Agreement. This Agreement applies only to the current proposal as attached. This Agreement may be modified or amended only by a subsequent written Agreement signed by both parties. Assignment of this Agreement is prohibited without prior written consent.

S. (a) The City may terminate the whole or any part of this Agreement at any time without cause by giving at least ten (10) days written notice to the Contractor. The written notice shall specify the date of termination. Upon receipt of such notice, the Contractor may continue work through the date of termination, provided that no work or service(s) shall be commenced or continued after receipt of the notice which is not intended to protect the interest of the City. The City shall pay the Contractor within thirty (30) days after receiving any invoice after the date of termination for all non-objected to services performed by the Contractor in accordance herewith through the date of termination.
(b) Either party may terminate this Agreement for cause. In the event the City terminates this Agreement for cause, the Contractor shall perform no further work or service(s) under the Agreement unless the notice of termination authorizes such further work.
(c) If this Agreement is terminated as provided herein, City may require Contractor to provide all finished or unfinished documents and data and other information of any kind prepared by Contractor in connection with the performance of services under this Agreement. Contractor shall be required to provide such documents and other information within fifteen (15) days of the request.
(d) In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, similar to those terminated.

T. Payment. Payments to the Contractor pursuant to this Agreement will be reported to Federal and State taxing authorities as required. The City will not withhold any sums from compensation payable to Contractor. Contractor is independently responsible for the payment of all applicable taxes. Where the payment terms provide for compensation on a time and materials basis, the Contractor shall maintain adequate records to permit inspection and audit of the Contractor’s time and materials charges under the Agreement. Such records shall be retained by the Contractor for three (3) years following completion of the services under the Agreement.

U. Restrictions on City Employees. The Contractor shall not employ any City employee or official in the work performed pursuant to this Agreement. No officer or employee of the City shall have any financial interest in this Agreement in violation of federal, state, or local law.

A.13.a
Packet Pg. 672 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT

Page 10 of 13 ends

V. Choice of Law and Venue. The laws of the State of California shall govern the rights, obligations, duties, and liabilities of the parties to this Agreement, and shall govern the interpretation of this Agreement. Any legal proceeding arising from this Agreement shall be brought in the appropriate court located in Riverside County, State of California.

W. Delivery of Notices. All notices permitted or required under this Agreement shall be given to the respective parties at the following address, or at such other address as the respective parties may provide in writing for this purpose:

Contractor:

Merchants Landscape Services, Inc.
1510 S. Lyon Street
Santa Ana, CA 92705
Attn: Mark Brower, President
City:

City of Moreno Valley
14177 Frederick Street
P.O. Box 88005
Moreno Valley, CA 92552
Attn: Dan Monto, Parks & Landscape Services Division Manager Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

X. Time of Essence. Time is of the essence for each and every provision of this Agreement.

Y. City’s Right to Employ Other Contractors. City reserves right to employ other contractors in connection with this project.

Z. Amendment; Modification. No supplement, modification, or amendment of this Agreement shall be binding unless executed in writing and signed by both parties.

AA. Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a party shall give the other party any contractual rights by custom, estoppel, or otherwise.

BB. No Third Party Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the parties.

A.13.a
Packet Pg. 673 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT

Page 11 of 13 ends

CC. Counterparts. This Agreement may be signed in counterparts, each of which shall constitute an original.

DD. Invalidity; Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

EE. Assignment or Transfer. Contractor shall not assign, hypothecate, or transfer, either directly or by operation of law, this Agreement or any interest herein without the prior written consent of the City. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer.

FF. Supplementary General Conditions (for projects that are funded by Federal programs). The following provisions, pursuant to 44 Code of Federal Regulations, Part 13, Subpart C, Section 13.36, as it may be amended from time to time, are included in the Agreement and are required to be included in all subcontracts entered into by CONTRACTOR for work pursuant to the Agreement, unless otherwise expressly provided herein. These provisions supersede any conflicting provisions in the General Conditions and shall take precedence over the General Conditions for purposes of interpretation of the General Conditions. These provisions do not otherwise modify or replace General Conditions not in direct conflict with these provisions. Definitions used in these provisions are as contained in the General Conditions.

1. CONTRACTOR shall be subject to the administrative, contractual, and legal remedies provided in the General Conditions in the event CONTRACTOR violates or breaches terms of the Agreement.

2. CITY may terminate the Agreement for cause or for convenience, and CONTRACTOR may terminate the Agreement, as provided the General Conditions.

3. CONTRACTOR shall comply with Executive Order 11246 of September 24, 1965, entitled Equal Employment Opportunity, as amended by Executive Order 11375 of October 13, 1967, and as supplemented in Department of Labor regulations (41 CFR chapter 60). (All construction contracts awarded in excess of $10,000 by CITY and/or subcontracts in excess of $10,000 entered into by CONTRACTOR.)

4. CONTRACTOR shall comply with the Copeland Anti-Kickback Act (18 U.S.C. 874) as supplemented in Department of Labor regulations (29 CFR Part 3) (All contracts and subcontracts for construction or repair.)

5. CONTRACTOR shall comply with the Davis-Bacon Act (40 U.S.C. 276a to 276a7) as supplemented by Department of Labor regulations (29 CFR Part 5).

6. CONTRACTOR shall comply with Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327330) as supplemented by Department of Labor regulations (29 CFR Part 5).

7. CONTRACTOR shall observe CITY requirements and regulations pertaining to reporting included in the General Conditions.

A.13.a
Packet Pg. 674 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT

Page 12 of 13 ends

8. Patent rights with respect to any discovery or invention which arises or is developed in the course of or under the Agreement shall be retained by the CITY.

9. Copyrights and rights in data developed in the course of or under the Agreement shall be the property of the CITY. FEMA/CalOES reserve a royaltyfree, nonexclusive, irrevocable license to reproduce, publish or otherwise use or authorize to others to use for federal purposes a copyright in any work developed under the Agreement and/or subcontracts for work pursuant to the Agreement.

10. CONTRACTOR shall provide access by the City, the Federal grantor agency, the Comptroller General of the United States, or any of their duly authorized representatives to any books, documents, papers, and records of the contractor which are directly pertinent to that specific contract for the purpose of making audit, examination, excerpts, and transcriptions.

11. CONTRACTOR shall retain all required records for three years after CITY makes final payments and all other pending matters relating to the Agreement are closed.

12. CONTRACTOR shall comply with all applicable standards, orders, or requirements issued under section 306 of the Clean Air Act (42 U.S.C. 1857(h)), section 508 of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738, and Environmental Protection Agency regulations (40 CFR part 15). (This provision applies to contracts exceeding $100,000 and to subcontracts entered into pursuant to such contracts.)

13. CONTRACTOR shall comply with mandatory standards and policies relating to energy efficiency which are contained in the State energy conservation plan issued in compliance with the Energy Policy and Conservation Act (Pub. L. 94163, 89 Stat. 871).

SIGNATURE PAGE TO FOLLOW
A.13.a
Packet Pg. 675 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT

Page 13 of 13 ends

IN WITNESS HEREOF, the parties have each caused their authorized representative to execute this Agreement.

City of Moreno Valley Merchants Landscape Services, Inc.

BY: BY:

TITLE: Mike Lee, City Manager
TITLE:
(President or Vice President)
Date
BY: Date
TITLE: Mike Lee, Executive Director of
the Moreno Valley Community
Services District
BY:

TITLE:
(Corporate Secretary)
Date
Affix Corporate Seal Below

INTERNAL USE ONLY
APPROVED AS TO LEGAL FORM:

City Attorney
Date
RECOMMENDED FOR APPROVAL:

Department Head
Date
A.13.a
Packet Pg. 676 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT EXHIBIT A – SCOPE OF WORK – Page 1 of 32
EXHIBIT A – SCOPE OF WORK
PARKS LANDSCAPE MAINTENANCE 2023

1. GENERAL PROVISIONS
A. The work to be performed under this agreement shall include the furnishing of all labor, material, and equipment necessary for the provision of landscape, irrigation and appurtenant maintenance services within the boundaries of the various City responsible landscape areas as determined in the resolutions or agreements of the City Council and/or Community Services District Board establishing said City responsible landscape areas and as said boundaries may have been heretofore or may be hereafter amended, and as more particularly shown on the Location Map or Maps included herein and as may be amended during the term of this Agreement.

B. The Contractor shall have the duty to: mow, edge, trim, and fertilize, groundcover and shrub areas designated hereunder; regularly maintain and prune those portions of trees up to eighteen feet (18’) in height; remove litter and debris from all sites as required under this agreement; provide general pest control services as requested, including but not limited to weeds, insects, vertebrate pests, and diseases; maintain irrigation systems; hand water and bleed valves as necessary during emergencies when automatic systems are not functioning; complete and submit required reporting forms as provided herein, Section 30 of this Exhibit A – Scope of Work, or as may be added from time to time; and submit invoices in a timely manner and in detail by and for each landscape area to include specific reference to sites for which work was completed.

C. All work shall be performed in accordance with usual and customary horticultural practices to achieve, and maintain healthy, viable landscapes. The Parks and Community Services Director of the City of Moreno Valley, or his/her delegated representative(s), hereinafter designated as "Director" will periodically inspect all the operations and approve or reject the work performed, and methods or materials used, and make changes in the work scheduling.

D. The Contractor shall be responsible for carefully reviewing the site(s), and verifying the square footage noted for each location of proposed work included in the Proposal. The Contractor shall not be relieved of his/her/its liability under this agreement, nor shall the City be held liable for any loss sustained by the Contractor for any variance between conditions as referred to herein and the actual conditions revealed during the examination of the locations of the proposed work.

A.13.a
Packet Pg. 677 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 







 !

"#$%&&
#%&$''!
($
$%
'$

"%'
%#$%&&
#%&$'%!!
(#

($&
&#)*
!!
(# +'
,$
&'


($&
&#)
"+ "#$$# +'
$'+$'-#+
#(%&

$''%%'$&
"'
%'
&'
''
$'+
$)
'#
''$

&!

%#&"!+$'%+!
($
$%
$%&)##

$%"+

)'$%'



"%'%%.!

"%&!%'$
!
/$ $'

'$

"%'
01)$!"%')
#$%'!

"%&

)%#
'$

"%'
 $%
&"!$%&$''&)

%'
)'$%
'
$
%$$

)
&

#
234567896:
')



 "#*##*%#'
$""#!
'
1)%&+

($&

 *

'
'$%/$ $'*
&#)
)#'
%#;

$'&%#$'$%

!
&)#'
&#)#
1)%&+

($&*
!
($##$%'$

"%'*
#)
$%%+"%'*
!
'$%'
*'"$%'%%&
&#)
 "#$$#
''#$
&
'$%%#!!
(',$
&'

''#$
&
'$%',$
&'
*')


"+ "#$'")&$%.'+!
"

'+!&&!' ''
$'+

"$%%##$%1)$!"%'
< $%!
!


$%
#
=( #

!
!
+

!%#* %&#*%#$%#= '
)+&%#/&

&$!!$%
*
$*%##
$
!
$
'"(.$%'&
$'
,&$!!$%
*
$*%##
$
%
'# +"$%%##$%!
'$%


$""#$'+&&'#*
"(#
"'
$'*%##$
!
#$%
"%%

'!)
!

'$

!&$$&'$%''
">
$'>
$%&)#* )'
$
%'$"$'#'*!!)
'%%'
#
&!$%*
$#

*&)

%#)''


?&$%
!
'$%%')

%%'(#$

*)%)
*
$%
&'$%
''$%

 
'
$$@#$'$(!
&%'ABCD&
$% &*%#'

)'$%
!
$
'"(.$%'%+'

$'
?$%$'
&

%




%'/&#'
$%&
AED
"/$")"*
'$%&
AED"$%$")"*%#
 #F)
'#$'$%'

!
"'

%

% 
$

0?$%$'

"

%




%'/&#%%#%.
$%&
AGHED"/$")"*
'
.1)
'

%$%&AIED"$%$")"*%#
 
#F)
'#$'$%'
!
"'

%

% 
$

')
 
#

 &)'$'(
'$& ##
J

'
$%'
$""

'
!

"'$
'

$
%'&&!' 
A.13.a
Packet Pg. 678 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 










!!
 

"#$%&'&

 ()#%("*'+
&"#
"
''
"'#
#%#!
*'#,
-(""
!'#.+ .
#
# 
 

#
/.
& #""


#% +'&0
".$12,
###.''(

&


. 

*# ! " ."+
#

".
"'

.#
##.''(



"'
%+"
 

.
#

#.''(###
"##- !&

&#

+#
3 '4 

 '45#
6
#

'

# "5#
7 
''
##.''( ! .8

"-
&"('%#
#  .
).( %
".
'%

'## .+#" (- .9" 
1 
8
!

#.''( ..''+ 
 -!. 
##.''.&





 
0.'
".$:2,%
!
  
! . '#
+
".#$2,.#.''(

 .
#)
".#$;2,( +

#<
# (  #.''(8
 '- !  

''+

)


!
  


-#'"#



.
#
" +$,+*  


# (
&


#(# '4# (!!'" '-''+
#!

''
 
! 
#
=
& 
> . ".

 
' 
! 
# (
"
# 
'*%!).(

?@ABCCDEBCFBGHIJKLMGLNOPGMOQGRSTJUV
'' # (






 . +''!
 

'%.' .-
+ .
.

" 
-#
("
" #+*




" W#" 


"
'

# (#&''# " 
#
.


.4 *
 -(#%
##  .
1;5

%
.! 


(".!  .5
#.
''

&"6 - -" $6,%
"'

(

 '
  
" 
#
XY0X1
.
'
9!

#.
''

" 
#ZY%
ZYZ%
Z1

 .!
!## .#
!"" 
#% 


%!


%
!# "
'
! 
# .#! 
# #  .
. 
 $1[W,
.. #
("
# 
'*%!).(

A.13.a
Packet Pg. 679 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 








 !"#
$!"!
%&!"'" "())*$"*" +&"
!
+))'
"+)
%'*!"
"
&!
!&+&#
"!
"
# ," +%+()!#
",
$" +
!
)))""!&&!
-%+
!

))($
!
#
&
#
*!"
.
//0
"123/14' ",5+!&
" *!))(%.
61
"
$$ '
$"
& "#+
"
 !
"

!",7 8
&
"
$&!
! ""!

#$+
91

))(%+
$":
1&
$$'$!  $'$&$(
#
 :
&
+
*
"$
##
&
" !
""
%+()!#
$-+"!)!",!
" 33
*,;

#"
,#
$!"!
'*
!#
"
!#"
 $&$"(
<$+ 

"!
" +%"!
"
"01=72!

!
"
)):
1%+
$"
() +## +)$%""!
""
!%"!#+) !" !"+"!
;


&"


3"
!$01-2)!
!
(
#
 &
$

+)),;
"!)!<$
), $!#"$(,
!",!)$ "
>
"!
" 
!
"
"01=72!

!
"
)):
1!
%#"$

+)),

+
$
$-"!&&$
# ,"&!
"!
%% !"!
""!

%+
$
$-"!&&$
# ,"&
+
*
"$

##
&
" !
"%+()!#'
$-+"!)!",!
" 33*,;
%+
$
$-"!&&$
# ,"##"
,#
$!"!
'*
!#
"

!#"
 $&$"(
<$+ 
?
+
$"&

,!&%$!&
"""
%%#

,
#
+! 
#

$- "&*")* "
+
*"5+)!",#!)!",

+
!
")
)):
1@%"%%),
%
$'
$!
%%*@!
$
 "!)!<$*!"
!
%#
"0?A2#
)!
()#

$*" )+"!

(#&&
#!
*@'
$("*
#+" 

,"@
*
"(
$!  $

))*!
%#"!#
))
"())*$:
1
"
$)#+" 
,@!
$0@B "+((!
B'B
!
B'B"!%%!
B'
B"%%!
B2

+" &$)+
*!"
"+
@(
#

!
"!",(
#
#)) ! "
(&!
"!
$"))"!& 
C %+
!
%!
"-%+
!
#&%+
$-*+
$$ !

A.13.a
Packet Pg. 680 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 








!" #
$%&
&

'$&%# #
()& !! #
#**"&
#&)*"+$&%# #$&) #

,"
!!* )+&!-*&!),
).#**
$
* #!##&
&

,"
)/*(%+* #!##&.#*0 ),!)& 
),)&

$)"
)),1 &
)&1%"
)/ #0 ),)023*$4)+$
)/

),! # !%!
)+
)#*&*
5&
)/
)&) 
.#*%+0 &

," #
$
)*&%&+)#
%& #
)
 &* ##*"&
#.#*&!-*

#
$

")&)&
)"
,!#).
#*

)
#* ) #
0
6)&),
)%!$& #* #

!$).),&
,""
/ *0 ),),
& #* #
7"--
8

)
#)&


)
*


9:;<=>?@A=BC=DEFGHI;DIJKLD;KMDNOPGQR

,&%"
&)"! #) #* #!##&),)0 $&!)#&!.,),+ &0),
&),$%&$

),

$

) #
.
,&%"
&* #*
#+!%) 4

)!!*(0"&#
, #0*+$#)
0,
, ,))!)%& )+
#)

),#
#)2ST3.&&)&),#)#)2SUT3

,#-&
)
#* ) #
$&! ).
,&%"
&)"0*)&0)

%!
), &%.#)%&
,$.0 ),),! # !%!
#
)& #)
#


&+)

%&$%"

)+#*$#)
%&- -
1
,&%"

,"$&%#*#*(&)& !!*$&),&V%#
+
&-
".

)&), #W, " ).

,*%.%#

),&0
* &
)*"+),1 &
)&.)X
S!-**.*

*.&*!*"&#
,

!-%#0#)*#
&
,!#)
#)$%"
#*(&%)  )+& ,)
440+

&&
)#+
#* ) #0,
,),1 &
)&,
*!*)",Y&*%


,&%"

,"$&%#* #!##&),)0 X
S#"
%



%*$)) #)), &$&)
%&
)
)%) #
0),!)%&) #),-
(#*
), &
)

#&0),
%
,.%#



$)*$&
)

&$&)
%&
$

2 &

3*
))
),&0


&%# #)
!%
)X
S/$)$&$&+
,&$#*.#* #$&$&0&/ #&*&
A.13.a
Packet Pg. 681 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 








!"

#
$%
&'
()*+&#

',&#'!"

-

'
,
&..'&
'"
/0'!,
"'&-
''1#
-,/'"'
,
!
!
2#"
'%
&

&
'
"!3
4'

'!&-
(5
-,,
'505

%%
'505
%%
'5+
#

'(
5,6
'505#!
'505,
'505%!
'5+"
,!''1"#'-
#

!
,1
#7

&

'

8%&

&,


-
.!-#"

#

-'/
,
'&##
'


1,
'&#&



,.
'

'!


.
9%
-'
'%
'
:%
-'
'&.%-'!:"-'!!

'




'



9



'





&
!9
;<=>?@ABC?DE>CF>EG>HIJKLMNHMOPQHNPRHS?TKUV

-'!&$


,.
'

'!
'.''

#
"
%
.
'
.0
#
#1
"
#


#%-
%
#&#'
&

$

'0
-'!&$

!
'!
.%'

'.8%&
0.-

8
..!%'
"

#



'
"
#
#,

0"##
#

.
-

1!'
6&!W'
(4X+

2
-'!&$
#,%
-'!:

..!%

#
Y-'&1

$
&,0



#
'6#
,

0
&#!-0-'
#
"
!

&
!,1
#7

&


3
4.$!!0!
!0
!.!,
'&#:&
"'
.$-'"'
!'&
&#.'

'

-%'%-,
&'!:
-

1 #
8
8"10"
#
'!&%&.%''
(
0#
-,0

0
-


0



'Y-
%.'
0"0'!.'-.'
+
.$'1
.%!
.'


#%
%
&'$1'&'-
'&'!:



."

"
#
-#"

Y-

1&

1
Z


&
'1&'!

'"#
&#
#7

&

#!.!
,# 
!-
72
-'!&$
#,%
-'!:

..!:
'$
!3
4',-&&-!%


'

#

%

&-




-

'0
'&&
!'&"

#&&%
!%
&

&

#%

&-
%&

'Y-

'


-'
'
#3
4/%
%
%
1#
%'!0'!
'%
%
"
/
'
!




!"

#
$%
&'
()*+&#

',&#'!"

-

'
,
&..'&
'%


'
'1


A.13.a
Packet Pg. 682 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 











!""
#$ %

&!#'% (

#%)



$
" $!

*%#&!+

(


, )(

(- ., )(

(#

/

"
*




"
*
0 

 


"

 
(
%0 
1234456789:7;


 !""#.)<%
""
 



 $#=(<%(

")
! 
)(

(


("$%-#$


"

%>$

 -
<"" - !
$#-)"

-
%
$
%('
#% ?
!
% ()
 -

("$%

-#$
"

%)
.

" -($
# -$
-
%

%<". ?
%

,"
% ()%)



 - %

%#&!+

(



!)$
)  ! 
)(

(

-<% 
%

% 
&)"
 )(

<! )
 
(


%


">!))

(!
-
%

%#&!+

(
-
%!

"-!"!&
<!!)"


"


%%
!

&)"
 <!
(!-

!)


!+

(
-(

$
)$#"
(!"!
&!*
% !""" #%

% <% 
++#



%#&
$"
%@
(!

("<%(

")


!""#

%
"&
'%
!
-
%%
) %

""




!
("%


"
0 
!
(" 
A2B::BCD9B78E:FGHIJKLFKMNOFLNPFQ7RIST




!""#



%
% %)
!
U$
(&

'
(#"-

!

V!
#
-
(!%$"-$
" !
<
 %!



%@

%

(%#&!+

(


!""#%"
'
%#&
$
(

$""&)
% )

."

&  -U$
(.($)"
-! #
## -
<

.- )(

(

%@

<!
(
%



U$



 !""#!


(
W %$&



""

&



& 





! $
 !

$""<
.

()#
"
&""
 

%



( !""

("$%-#$
#"

%>'
$"
%)


"

)(

?
("

@%=$ 

 )

."

**" ?"$ !

"

 ?


$
% )

."

 $
)
)
('
?
$


)

?
%!
 .  

%#&

&

"% 
+
!)$
)  !
(

-
$






)


%

%
)


%@

)"(
V


 )

."

)

."
()

 
%@


,
)
 $

*%)
)
%@



 XY"
""

 Z[!!'#


%
%
A.13.a
Packet Pg. 683 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 








 !"#$%
&

"'()
 "
*%+ ,
-%. /&+
"0"+ 1"/
&///
2"0


"/3
3


/"+ ,


1&"+

"/2/"&1"
1&
"/'33+

14)

."//&
/+1"

/ 1"
)
/+&!

&"1"
../%

//!
5

 ""/'(&/*%
 




 !"1
1!&/"1/"0
"0
"
1"
6/

"/+/0

1/ 
  "
4+

70
"
3 30
"
1"
/0!
/0+"1/"""0
"2+
&"..1"!"
.1"0"/1&
"
)"0"0&4+ & /" ""0/"'/%30/
.1/0
!/
2 "
1"
8/

/)01 !1"

"


"/2/"&/
1"/+ ,



/3
93:!2

" 

"/2/"&//0#
$3

" 2)0
"
1"
8/

/


/"/"3
3"!
  !


 /

/ 
1"
2 "2 /"3
3/
1" 
+


 /1//
2"/!






"
1.
"//"0"10"&

"3
;3.2 ,
1/!
/+.!"/+ ..
7/



2/1!

""&/3
3!"&"1

"/2/"&//0#
$3/
1" 



 /1//
2"/!




2

"
 1.
3
3"!
  !


 /

/ 
1"
2 "2 /"3
3.2 ,
1/!
/+.!"/+ ..
7/



2/1!

""&/3
3

"/,1&
"/!/ "1"

"/2/"&


//0
"0/&
&!1"!

/"0/
2/" !//"0
)/

.
2"0
<
1"


"




"/3
=>?@ABCDEF?GCHH@B
3<

/,""
1"
/0


. 

"0
I!12

.1
+//"

"070
"+
10 !+!//"0
)//"" 0
 ,
/ 
1"

2"0<
1"
3 30
"
1"
/0
&.&& "2"

!+"
&&+) +
 
"0
)
4 I!
 ! 
"0/
&"+ 

/
"
20/

0



&1"0)
43 3
"
1"
/0
&.
&
"0
" 
/+

4"/  J1"
0
/1
/,)4)2/"0)"&/+)0101! +
!"
"&" "#

""/+1/+


,
/"1+1


+ ""
+"!&
) /,)
)
"
""
+!"&
"
/+
&"1"&/3
"/"0"
+"0
"0
A.13.a
Packet Pg. 684 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 










!
"##$#


%&'##(
#
%($
'
"




(

'
#&
()&"&&
'*
+"%$##*""


"
'&
"%
",
,##'
%&
!
&
'
"
#)%()

"
#-
%
&%*#+&
)
(&"%
)


&&'##(-"
"%"'.
%/

"%
",
,'
"




&'##%&!&##%(
&"%#


/&
"%"##-""
,
,'
"




&'##"
$
'



--%
#$*'"0
&)&!
)&"%1

'.
%)&*&
-

#&
%&
0
%*
'"&
0

&
&,
)
'
-

#&-$"
#)%()

"
#-
%
2%&

%%-

#

'

!

#)-/(&%#3)%&4!"
4 '-
#
-!)"%&"
#)%"()
"
#-
%

!&

%&(
'#3)%"%%
$4"$)"+"*"#3)%
%
$-

#"")"-
+%

"
"
4')&'#%!!#"
&4')&'#%#

"
%0
&"
#)%"()
"

#-
%

#0&"&
-!)

&"%
-!)

-"

&4

-&

--)"
","$&)
'


#&&'##"
(
)
'%'"%#%
""$*$
%&
)
(%
-0%
-
'#

"*'

'$*
%&
0
%,
"




5&
&
&'##&
)

'
"&
"

$($"$
'
%!

$)"
#

$&


0&


'&
,
6789:;<=<>9:?@9
,A"
#,
B,

#.
&'##()&%!

'
3)"
$

0
(#&&


'"
 '(


'%)#)"#&&
'
*&&

%'
""%1
&%


%($

'



,
,

'%&


""%
3)&

'



%%
"#!!#

"&-$(
!
0%%

'!

"

-&#&
%"
'%%
"#
+&

" '(



'%)#%,
,"$
")#


#.
-

#%!&
%"%C
"
'
%&
!"
"
#)%"()
"
#-
%
&%*#+&)


&!0-"

"



($&
)
#
$0)#
&

'&"%(%&'##(
##

%--%
#$"%

%&

()
%0"#$

&&
'


%


-0%
-
'&
"%
%&!&%"##-""
,""


)-&
"
&'##

#.
-

#
(##*%
"


'&
5&&

-%
"&$&
-,
D,"$

#.
&
"
""
"*##(
-!#
#$
-0%
-
"



&%*#+&(



"
!
0"
&
"",
E,


""


"




-)&
(!
0%%0FEG*
+"%$&!




#.
!!#

",
H,
"




&'##&)!!#$

'



#&
##!
!&%

#.
&
(
)&%"
')###-"
&%
-"
"%!
 '(


'%)#,"$

'"&
&%#&
&'##(
!

%!
 '(


'%)#,
I,
"




&'##
-!#$*
'"$%
#&


#
#
!

"

3)
-"
&,
,)


#.
"
A.13.a
Packet Pg. 685 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 







!"#$#%!
$$ &&$#'""
!!
$$"
!!!" !"#$#%'&! $$$!"#$#%!!"  #('#)"'($*#! ""!
+,-./01+2345637898:;78<=
>;76?@63ABCCC?DE47E
F<=7GH2IJ63<4
,@@98K;78<=?
+L@6<4
5637898:63
.J?E<45637898:63
M!)
NONOPQQR$ 
S
(OTOTQN$ 

)" !OTOTQN$ 
QOTOTU
V
W
W!&&!X'Y
$
("!$$'O$!"#$#%!

!"#$#%!")("#(
#)!(
"!#("#()$
'#(#!(
"
$$Z#()"#((!"#$#%!
QQNONOPU
VW
W
M
[W
M
V
!O
!("'
("!$!
&&!X'Y
#X$("
!"#$#%!")("#(
#)!(
"!#("#()$
'#(#!(
"

$$Z#()"#(\ $Z\!!'#(!"#$#%!



!"#$#%!" &&$#' *'!&&!'!($*
R

!"#$#%!" )
&"'\)!('\('
X
#(#

(#"!($X$(O
$(&!)("]T^_]`!O&Z!\a`!(!
Y
$_



!
('`!
('
X!!"#$#%"#(
$$
!
('!
(')X!#!!#"' *X!
'&!*&!#(b$!
$$
!"#$#%'#())!'()Z#"
"
"('!'!"#$#%"#(
#'$#(
#'("##'#( $ $ZZX!\"
!Y
()*"
&&$#)"#(
$$
)
&$*Z#"
"
&&$#)"#(!Y
()*!"#'("##'#("
!Y
()*

!X#) $\"!"
#(c
# #"\
)
'
$

$$
!
('!
(')X!#!!#"' *'!#&#!!#"#(#()(d
()"#(Z#"

!"#"#(*"

$$ !"#$#%'#())!'()Z#"
"
"('!'
!"#$#%"#(
#'$#(#'("##'#( $ $ZZX!\"
!Y
()*
"
&&$#)"#(
$$)
&$*Z#"
"
&&$#)"#(!Y
()*!"
#'("##'#("
!Y
()*
!X#) $\"!"
#(c
# #"\

)
'
$

+,-./001eG32J;=fg3<2=fh<i635637898:;78<=
>;76?@63ABCCC?DE47E
F<=7GH2IJ63<4
,@@98K;78<=?
+L@6<4
5637898:63
.J?E<45637898:63
&!#$
]
X!
'&!*
&!#(b$!_
OTOQ

NT$ 
&!#$
]j!#&ZU!"#"#(
*"
_
a[
!"#
cc
[(')&QQ
&&$*&!
(
)"
!!
&)##)"#(

A.13.a
Packet Pg. 686 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 











!"#
$
#
%&'(
#)
*+*,-


!"
#
$
#
%&'(
#)
./+(
#/





0 %12
%%&
#$#
)
34

%
55
4&"#6--
($

&767

#
#6%%6%&#
($

&767

#
#6%%6%&#
-*+*,2
8

49 :
;

 "<7(
--34

%
554&"#6

 "<7(

0/

%(%=%&
/!%&&

%(%=%&%#
%&%&&

(&"!(!$
1!

#>&
"7656##% >
%">
7&&7
(
1!/

%(%=%&
#!((
6&#%"
"""%%&(
'>
5!%
%
/
/((
##!((

%(%="#"%
6"
$
%$%("#/
%(%=
$&"

#1%((
#6%%"&
?

#%#/
/
%(%=
1%((
(%"

&767

@#
6

&"%&#>
#
"%
6"
$
%$&"2
0%#
%6%("#/
A/B%&?6%&
"
%((%&%&

7&'1%((
((1"/
+/(%6%&##!((

"1!&!%
#
1!(7#!!$
%#C,D (5&#%&>
7&


%(,/
A.13.a
Packet Pg. 687 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 








!"!#
$

%&'()
%*
+,-.('/))-'0,*.('/))-
112'+,-
(3+456+5,(+4,
'42(5,*254,+3),(',+375,4',()152(5% %))75,+4+077)+4,+'55*))8108-(2'0(,*527(3+5+'7(5' *)0+'3)+0)+4'597(1+,(4(,++4,+552072(52',, 4,+'5:;
'0))<+'9'0
4,+'5=>'0))<+'9,*
)+('+0'0
(+42),2()
0%
+07(5'(
',(4,(+5,8(+5,(0,4'024,75,
4',()825+'55+',*
,,
)+('+9'0,*
2',-+3(5+002(+',*
',+(,(1,*+5(1',%
%))75,+4+077)+4,+'55*))877)+050+(4,08-,*6+(4,(% =%))75,+4+025(411'0,+'55*))8+'<(+,+'9'05*))8108- 7(5'*)0+'3)+0
,,
)+('+75,4',()03+5()+4'572(52',,

4,+'5;;9'0))<+',*
)+('+0'0(+42),2()
0%
+0
7(5'+5,8(+5,(0<+,*,*+4,*(+42),2()
11+55+'(,*

2',-+3(5+002(+',*',+(,(1,*+5(1',%
>%(,*8+''+',*(1',7(+09
',(4,(5*))5277)-,,*
6+(4,()+5,))7(75075,+4+05,82509)'<+,*25 (411'0,+'(4*75,+4+0%?75,+4+077)+4,+'5*))8107(+( ,
',(4,(@55281+,,)'06+(4,(@577(3)5+0)+5,9'0 (411'0,+'5%'-4*'5900+,+'590),+'5(5285,+,2,+'5,,* (411'0075,+4+05)+5,05*))85281+,,0+'<(+,+',,*6+(4,(( 77(3)7(+(,'-25'<)-(411'001,(+)%
A%6+575)17,-75,+4+04',+'(59+10+',*
2',-+3(5+095*))
8+'5,(+4,417)+'4<+,*)8)0+(4,+'9(5,(+4,+'59'07(42,+'59'0)) 77)+48)0()95,,942',-9'0)4)(2),+'5%*6+(4,(1-(B2+( 7(524*417)+'4+',*(147-
',(4,(C5''2)D,,(

17)+'495+55208-,*
2',-(+42),2()
11+55+'(9'05281+,,0
8-
',(4,(,,*
2',-5,.'1',67(,1',%
:%
'+)
',()
%
'+)55*))84',())0'(2)(85+5',*))<+'7)',574+5E +%FGHIHJKLMNHOPQRHJMN
++%FIKSJQHNIT
+++% UHVHJQHNIT
+3%WSXSPYRHZZQNNIT

8%
'+)55*))84',())0''5'0085+5')),*(7)',1,(+)%

%7(,+'
74++4,+'5
A.13.a
Packet Pg. 688 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 











!!"
#$"!

$!$!!
%&$
'


''
#

(
$
!&'$"&

!$)$
'
*
$



##!+('

$
$',#

(
#
$$'"+!!
&
+(

''
!
$
$'
#

!!

$


&

'-!$'$
)
$ .$



)+
%&$

#$!!&



''
#

")'-$!"!
$#

$"+
$
+


$-$

/
+0&
123 &

$








/
$


$
 !!"#
-$''

.$



$-143/
5$'+#
$

+
#
$
$'##!$

$*
$
 !!$
!&')
)$
!(
(

'
)
'##!$

$('
$)'+

6
&'
-
(

&"('


$
$',

$

$
'


!
!!
&""'
 !!"


'/$
##
#
$
#
0)



"$
$'

)7$)&)!!/"!




'$

!"!('



&!
$ $


)
!!"#

)'#


%&
+


-$
"!(7 $"$
(

'&!
##
#
$

)$
!


!)&
"&'
!!/$/'

)&'6

"$5&+&6


*&
'
'$!'$'/'

#&

+

#
$')'

+"+
.$




.

'.$


!
 .$



)+
%&$



$

#
$(/ $

&"8

'
7
$-!+
'&
+
'$
$("
$'/$
/

('$


'"+
$
+$!'
$$
#

$


%&$

&#/
''!$-
++
) !!"
$'
'
''$
$!
5(#
7 $"$


 .$



)+
%&$
!!
!
&#
$"#
+'&!!+/$

/
##!$

$
##
"''
)
#
+ &!'$

$"'


'
##!$

$


%&$

&#/
''!$-
++
) !!"
$'
'
''$
$!
5(#
7 $"$


 .$



)+
%&$
!!
+
&'
+


#
$&'
"$

'
/$
$
"!$
"


'/$
&!##!$

$
##
"''
)

#
+##!$

$


%&$

&#/
''!$-
++
) !!"

$'
'''$
$!
5(#
7 $"$


2 .$



)+
%&$
!!9&$#
&(
$&(
&#
&'
+



#
$&'
"$
'/$
)$
"


'/$
##
#
$


$
$'
##!$

$


%&$

&#/
''!$-
++
) !!"
$'
'
''$
$!
5(#
7 $"$


A.13.a
Packet Pg. 689 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 









 !"#$
%&!##%"&'"'#( )
*#+!

)

&"#!
,"&"&,
#($!!$)#!##&
 *!"&)-
.! $

"-( /"

!/ $' 
!/


*"


0'! #
'#(+ &&
!/ -#-#
*##

)$"#!& &
&&!
!"
 1%( 2!)!


' 
#
!$!&3#
!
 !

&
"



"
.! $
 &
 *!"#



' +&(('

!"
"-#!
4#5
2$&#$$(
)

/
#%"(( ( !
 )!$!&#

)((
!&!"
$$ &"$+!


)
#($!!$
!"#

)


'  #


.! $
 #&
 *!"&
)( "
""'
+&
 ##!"
'#!"#

0'! ""'
((
!$
!"#( ,* "
 )!$!&#

)
& #'$'#

$
!
' 
((
-
' +&$"

*
 !
#+!
!"

!* *#
#
)
!#&)-
.! $
 *- #'

!"
####*"
"",
(  *"$("

!#%( 2!)!


"#$
"&.!##
"





'  #


.! $
 #&
 *!"&
/!#
 -'"'#
!"$
!"#

)

&""'

-+!
"(( ( !
'"!$!&%#&! $
&

)



 !"#$
%&!##%"&'"'#( )
*#+!

)

&"#!
"&
"&,#($!!$)#!##&
 *!"&)-
.! $


66789:;<=>?@ABCDBEF


"
$
 +!

& 

$!
!
!#%0'!(*"
"&*"

-"&""'
+ 1
#$&'
##')*!

&#(


"
$
 G#)!&%"&!"$ ( 
& !")-
!#
 "$
##$&'
#%"&"-(( /& /!#!"#
 
%+!

)'#&)-


!
-#)#!# &
 *!"!"
"
$
 G##
!#$
 -(  *"$


/!#!"#
$!
!
!#%0'!(*"
%"&+ 1#$&'
#+!

"
)!*(
*"
&+!
'

( ! + !

"(( /

.! $


"
$
 +!

#')*!
( (#& /!#!"#

0'!(*"
"&+ 1#$&'
#!"+ !
!"


!
-

&& ####

!"

 *"


#

"4H5+ 1!"&-#( !
$**"$!"+ 1(

( (#& /!#!"#

!
' 
#')*!
( (#& /!#!"#
0'!(*"
%#
!"% + 1#$&'
#)-


!*
!*!
##
)
!#& !")/*- #'

!"

"
$
 )$*!"
!)




!
- "",(  *"$("

!#( 2!)!

.
)/( /!#!"##

"
)$"#
'&

!*!"


"
$
 I# #("#!)!
!
-
 $*(
-!"+!

 0'! *"

"
!-
.! $
  &&!
!"
*!"
""$#
#

 !"


A.13.a
Packet Pg. 690 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 










!
""

#$

%#
#
&#
#

"!
#'()&*#
+$!,#


+

+
#-"".
, #"
$.
$,-#



,
#
!
, #"
$
$,
-#



,
#
!#
"/+!01/
#!

"#-#
+
2

#"#3
#
4 /
#
4 ,,"# 
#
,!
# #+!1$
$-

+4
5

,
#
!!+!#

+1$

%#

6
## 
#
.
, #"
$.-#



,
#
!!
""#
"/+1#+! #,
#
 #


++-

+(!)7 /
#
0-
#"!
1/!+0
+

+
! --
-


+ -,"
#
!#+,
#
!


#
"-

&


+!,-
,

,,'+!
+/"/
!0
#-,
# "0"#1"
+-"
+! ,#
0





#!8/#+
!/1-#


+9/!
+&*!
+/"


%#
,,'"0&
#
&#""""&







-,"


!
+
+!/-&*#
""!#
 +
&#


,,'+!'# !
+/"#"/
+'#!


#
$-$1 /!!!!!-



:,-
,
"
#!
;

,/,!!

#! 


0<*#
%$!=>
+$!

/
#+$!0
7 "/+#

"#+$!!,'#++
#


/!
:!#
-#



!'# &#""
1-?2@@-
52@@,-*-$

1,-+/
!#+

+$!
+

/!!


#
1'0!&""!
""
#
$
"#+$!0&#

/

,#&#



,,'"

%#


"#+$""!

/
+$0

""&#
>
+$!
""1

+$


"#+$#!
1!'+
"#+$""!/,


/+$0

, +#
#+$!
""1

+$



"#+$#!1!'+!
+/"+-#



!'# +$""!
+!#

+

"#+$0





!
""!/1-#
,,!+-*:/,+$

%#
A!
,,'"

BCDEFGHIJKGLMGNOPLQKGLJRJSJIJPL
&+

-





&

!

,-+"
+! ,
+
##
#
-#



!'# !

!#
(!)!#+

##+&#

#

#!-



,#$A! 


#

-0

%#

+



!
"" 
+/


#
!,
#
""!#
! '+/
+

#!-

!!
!,
# 1"
#
!
7 /
#
0
+,#
 --
-





T!,
#
!""&#
!#+
#
!,
#
0 



!
""!/1-#



%#
&#


#+'#

#$#




/" 
+#
#


!#
(!)"
#'



#
$
, ## 
#
!0#
"/+#
1/


"#-#
+





/
+7



$+# #
#!

+1$





0
+
 *
&"++1$

%#





#!
1$+'#!+



#!#+'#

!
""!'!

1

-*

%#
T!'"/
#




T!,-

/
+

#!-


A.13.a
Packet Pg. 691 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 










!
""


#
$!#!%#

#

&!'$%#
%("
(
!



 &"")*(%&$+





,


#
-.
#
(
#

%!/
&

#

0"!!( ##&

#

'
(
!!
"" 

#
.$'
!
""


$"#%#
&


(
!"#!
&#
$"$")*"+#
#
(
!.1

"+
2
)!
(
!.1

"+3
&! (
0# !(
!.(!
# #&(
!.
&
%("#

!

45678999:;<=>?@ABCD?<EF<BGH
(
I'
+
#
#
(
! *"+
2
)!
(
! 1

"+
3
&! (
0# (
!
,
"'&!
!
# #&.
#"#J.
J&!K
%("#

!
(
#
/

1

"+


%

"+(+%



)*!(
&)#""

$'

#J&'

#"!'
(
!
 #0&.
&((0&$+

L#

L
L#
%+I'#









&%
#
!)#


#
+M!#"&!


!%#N&#

0"
0#)





O!(
#
!.
&!
&'"'
')*





!
""%#

#

# 
!%#N&(" .
&$"#!
&#



"(

&#
+#




O!)

%#





O! %(
+M!
%




!
""
""
#%!%("+!%!(
!#$"(!
,!/
 #0(

 ""!

&
*


 !!+
#
&#
""#
I'##!. %("#

!.
&P%
+
""! #0&%

L#


'

#J&#
&#0#&'"!
#!!"#!
&
$")
#!(!
,!/!
""$
$"
)

+Q',R/
'!(&+.!0
,S/
&+!)*



)#""

#+

L#

(*!
&"
&! (T%0"
)#

#

,/ "
&&+!
+




% 


#
%
#



!(
!#$"(!
,!/
2L'#

%")*#

'!.





O!
'(0#!&!#

&%("+
!(
!#$"(0#&#
%#



!0# !



#
+!
""$&#
"+0#"$"
#%%&#


## 
#

'
!%
+("#$""

# %
!.#
"'&#

$'


"#%#
&
.%$#" ""'"(











O!&!#

&%("+!
"" 
#%!#&

## 
#

)#

#

,/
' #(


!)#
!0# #!
 (
$"!'$!
#
'

0
"+&'#
(#&!'
!#&
%")*#

'!.(0#&&



#!
&0#!&%
+ ""!)#

#

,/
' #(


 ""$+


!)#

!0# 
&)#

#

)

+Q',R/
'!
 #(


Q%
+ ""!$+



!)#
!0# 
$0(0#!#




O! %%'
# 
#
)#


#
+
#!

%#
#%'% (
$"!

&&'
&

#!%


A.13.a
Packet Pg. 692 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 










!
""!#
$

%
& ""%
&

#
'!"'!
$
'

'!!
'

"




()*
+!""('
'!


'' 
'

!'
+
'
!'
,",'

%
&#'(-

%"(-'

+!.





!
""$'!#

/+"''$#!

".
$/+'#%



!'
('

'

()*
+!'!


'' 
'

%
&%&0 ""$0&

""('
'
$','$+"!
'!


&
'%1

'
&2
 23
4','!'
2

!!'!


'
&2
"
3 '"'
'!2'




+#,'!

-!
$
%%+
'
&
,' !4'



2'




+#,'!

+0"' -!4'

"' 4#
%

-!
$
%%+
'
&
,' !4#+
&
4'

'4#
%

-!
$5
$! #
,' !4','!'

2

 '"'
'!2'







-!2'




+#,'!


$6&


7



8!%
&!#
!
$
&
 !!& 
',(-'! 
!'$$
$$'
'
"-!$'
$'
9
'0'

.+
"!!!'$%
&'!$
%'
$

,
0
+!$0&

%'!!'


'0+
0"







:;<=>?@ABCDEF
"" %#"'

!!
""0!#
$$
!!
!#!!'0"


'' 
'
.0+
'
""
!!('

'

(

&6+)G*
+!.


!
'!
'


4'

& %#"'

'!

!
'!
'"&!#
$$
('

'

(

&6+)G*
+!.

4'
!
""0


''$'%%$'
"&

!


%$&'


 %#"'

""($0&
('


#



4'
('

'
',)H*(-'
$&!

 %#"'

!


%$'$('

'


'%!# ''$.
$


!
'!
'


4'
.

4'

%& 

!# '' %#"'

0&+!'

"


',!+ 


" !

'
+$0&


'
&
$I4'!
'



 !!&%$'!('""0$$+
$%

#&%

!('







%


'
&.#9
'0'







!
""%'

'
('


 $"" %#"'

!.

$

$
'%

.
$


'

-
#+!+


.

!


6
'

'$
 $!
""0!+0%'

$


4'
%

"&.!#


2

"&5
$! #

,' !#



$$'
'



#,'!'
!'
"+$$
'
.'

,

'"+0&







!
'!
'"&%$& %#"'

'

'%"&%


&

0


'!



0&



.


'
&%&'%%$'
"&.+#
('




' 







.
%'



'! 



:J<=>DEKB=E>KLFFEBMM





!
""#,'$!+' '

#!

"
#%""(-'
 $

('


# '' 
'
!!


'
""





8!%'



#!

"
!
""0!+#,'!$

(-!'
)!*0&/+"''$
+#,'!'

%#"&


A.13.a
Packet Pg. 693 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 













!

"#
$!%
%&"%
''(
)&%




*%
!%

!

*+!




*

*,#%%%%)-"


*!
('

").)
&&"!

!
% !((%
#

&
*!
))%
$!
%)-"
)
&#

%"#
$!%!%*(('
#
$!))
((/
)',
*





0%&#(,%
%"


&#(!%*&

*!*-"(!
,/
./*!
*/!(('

#
'(

*+!



,
)


&&"!

!!$

*

!

"#
$!%
%*((')&)
*$'
)(!$
)

*






*





)*!%&#(,%)%"'





%.!,.%*((
)"

*&%($%!#
#
.#
%%!(.)!
!
&

((
!&%.)%*((
"%

*(%
#%%!'(!
$!


*#"'(!

*+!



&,
-"!

*







&$,&#(,1%2)&)

(%%.
!
&#

.

*
/!%'3

!'(./*%

!")&#(,&

*3'!%

%!)
)
'



,

*'%
!

%
%
*
!
,
+*





%*((
-"!

*&#(,#

&!/
")

*
&


)*

'%!
#"'(!
/
%%
)
)%/
!

!
.!
(")!'"

(!&!
)

/
!#
#

(
*!.#
#
%*%.)
*


-"!
)',##(!
'(

,
"(
!%)4


!(!5
4#%
!
!)('(
-"!
&
%

*!

%%*(('/

((
!&%)%*((''"

)##
$)%
,$%
%%*(('
/
',





0%&#(,%/*/
!#
/,&)!%.&"&
%.
#
/,%.)
*
*!*

!
6*5
)
%%)

&!)',
*+!




*





%*((%
'(!%*!)
!!

!%,%
&






0%#
%(
/*!
*
(
(,!)!

%
*&
*







*#"'(!
*!)
!!

!
%,%
&%*(('"
!%*)

*





0%7#%)&,!
(")##
#
!



!
.)4
&')%%%#
!!)',
*+!




89:;<=>?@<;AB?CD==E;ABFG;H
*#
$!%!%


!%IIIJ.IIIK.)IIII
*
(!
!L'

)


)!
*&#(,&
#
#
(,
!%

)##

!
%&,##(,

*!%

&
!
*





.
,%"'





%
*
")
.&#(,%/

%!
,##

!
'(




)
!%
*





M%%(
%#%!'!(!
,

&#(,
/!
*
*L'

)%

!%
!
)'$
&
!
(
!$
##

!
%*!#
%
)
)%./%
*)"(%.)
*

-"!
&
%&,''
!)
&
*

(!
!+#

&
)"%

!((
!%
8N:HDC;B@
*






%
#

&((/
%"
(!)!
*#
$!%!%(!%
)*
!!
%"
*&
%
&
((

#
)%
)
)%
%#


!
%)
%(,
&!
!-"!#&
.&
*!%.)&

!(%.)#
%

!')&#(,((
#

"
!%)%
,#

)"
%
(
)

*
*5
)%
%-"
!(

*/
O
)

#
%))!
!((,
*%(
%#%!'!(!
,

&#(,!/!
*(((
(.


.
)
()
*
((
-"!
&
%!
(")!'"

(!&!
)
."((
&#(!
/!
*
A.13.a
Packet Pg. 694 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 








 ! "##$$#%&'#

 "
#(


!

"
##%

$
&##$
 )% &#*"% 
 
&
+
$#! "*'& 
&
) 


%!),%
%&)

%#
 )- "
)

'

$*'#%& "




'#% .*
!)
"

%
$
$
!/
/

 
&
+$
%
##'& "*&"% *&

 
&*
#
$%'#'
*&% ) "% & - % &$*'#%&
%&/

 
&

##*
%
)

& "
% % *&
 &)'

%
)#%
 "0
% % 
!'"
"
&
!'!
,%
&
)
 !"*#!& %*"$*'#%&!%&%#/

/
 
&
10
2

%&& 
#)% &#*"% '* #%
%")!$ "$#&
 
% )'

%&") ""#% 
)
##'% &&
" &0%

34 *#
5 %


%&
 
#,-%&)678

&*

 
-%"-
% 9
#%
%

*$$#
 :

;
$

!
%&
 
#/
,/
 
&
10
2 *#"  &
&
% $ # 
%&'0 

*

<=66/
/ ">=6/
/)
'0 

*
=6$/
/ ";=66$/
/
/

 
&

##
% % ##0
2%

?
"$
 
$
$
!

*#% 


 
&
+$
% /

 
&

##% $&
##$ %#

?
"%"
* "

%   &) "2$
&
"% "%&% "
% $&") "&% 2 /
%"
&
"
##'*'
%"
,%
&

 
#!
$

4 
#!@ "&$

-%&$
/ !
?
"*& "%% "'!


 
&
)0
%&
% 
*#
 
&
+$
% )
##'%

"%#!

$
"
,%
&
/
/

 
&

##'
$ %'#

2% 
% 
&

&% )% &#*"% '* 
#%
%")%##% 
#% *

)
$#&% -#-'A&-
) "
$%
% %

%%
!
)$
&

'

$*'#%&




% .*
!/
B/

 
&

##&$
*##!0%


%!% 
% -%%  !&&%" #
% .*
!
"
&&*

%  
%)% &#*"% &
$#0
%
$




,%
&
0%
% %-8C90
2% "!##0% 
&&*

 &/
/ ""%%  !$!
 ""*&% 

   D$


 &$ #%)

$"%#*
&
$#!0%

$
-%% 
%&%
!
*#% 

% %



 )$






 /

EFGHIJKLMNJOPMQRI
/

'% % 


 $
%")

 
&
%
S*%
"*'
%
#%)0
%&

##% &#*"
A&
 "T
)@'#) "4
%#
! ",

84
,
9##&

%&#$
$"
** "

%

 )% &#*"% '*
#%
%"
%#%?
 "$%&%")
$$
-#'!
,%
&
/

$$#%&'#)


%#% &#*"" 
%#%
##'&

%&#$$
-"'!


#%
%
,$

 " "
%&*#*
/
A.13.a
Packet Pg. 695 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 









!""#$

%
$&

$$'
!$ 
%(

$ 
)!"
*
(
%%
 +"
$%
$"
!



$, 
**"


$ 
%)

" !""$#
)%*


**
("#'!






!)

"**"


$ -
$
"+%
$#+$"
)
%

"
.
$%*

% - !""#
)%
$

)*"
$
&
!!"#"%



$ -


$ -$%*

+
$  &""
 &
!$'!

/+

)$ %)%$
 
'#'$'
+$'- -
%
"

+"
'$
'-
!

0 $%
))+$
'

(

 *
)$!

'
1
$2""'

$


!""
*
""

"
.
$%*

% + %
$!*

)$
!&
0  $")$
$


3 1$!"'4$%
*

(


*
- 
!!

$
!

*
!""
$
"+%!%-
)%'-"

$-'*)

"-)!%
**"


$-$%$(

$)$"%
56789:;<89=><==?:98:@;ABC9DEFF=;G;89:;<8AHA:FGI8>@FAJ>FDG;:K DFL?;DF@?DM98D?8<NNG989EFGF8::D9;8;8E
!
$


!""*
(
%O



)


$
$
,
#$+$1$)$

$


P )*"' $% +#
$



$'

"+
*
(
%,
#$+$1$)$

$
$
(
"
$

%
OQR
SR-O

O

TSQUO
O4

44,O

V
41O
O
W
1 UO

X
1O 


V
Y,1O

2


,OW4



O
4O

O
2
O

-

,OW
2
-O
O






2


,OWO
OO
V
OR,O,O
1OV1O

V1X-


$2

-

!%'&!

! +
!
"+


+
-$% !""
$%%

$-##

!!

$

&
!!

'1
$2""'$%Z
!

'1
$2""'
))+$
'


(

 

U[

'\X


$


+$%
$% $%
 !O



)
(
"
$ 

+$% 

$

)$

$#'!$(

$)$"



$$
'-!
Z
$"

 +


$
"
%-$%!

'$%)'
 +"
$*
)

)
$
$
U *&
0
%
X-

(
"$%

)
$"
$ -$%
)
$
$
$


' +#)

$*
* "-!
$






 !

'!
$


P
)*"' $% +#
$


-
$'-!(#$

$%
,
#$+$
1$)$-$% +

$ +) 

$
"+%%
$!

* "P )+$
(


 +
! 
%

$
$
5]7DFA:D;B:F@>FA:;B;@FG9:FD;9=A>FDG;:98@?AFB<8AF8:
!

' !"")
$
$
$+""

$%
!
+!+!$


)!

)$("
%

%1

"

)

+%#'!

+"+
"

))

$
!
+$'
(

%$#!"!
"

$
*
)$



%+"
$!
$


!""
)*"'&
!""*
)

$%

$ !
A.13.a
Packet Pg. 696 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 










!
"

#$

#!#
!
%
!
%$


$&'!%

"'!


"
(!


!'
%

!$

)
)*
"
$'!

+"
!

,



#
"





!

"
%
-
"
!!
%
$

!
./01234564675894:;2<6
) 


"
! ##=,

'
%%


#>
!



=!!!!##%#=!

=

%#"##
"
!!
%$

!=

"#'%

&'


#
$

%
+#
%

'!

!!
-
"
!=?'
%
$
"
,@'
%

!$

)
.A08497:<;45<BC258D6<:271:4ED17<2B56
)
#


#,+
%!

F"

"
!'&"

"
! ##

&?'#

%
&
%

=&#
!
%

&
%!#=!'&G"


?'
$

!
"


HIH

'&#
"



"

%


$
"
"

"
'&#
",@=!%

%

!" 
='
#!!"'

#
!
%
%?'#

%
$,@'!'


-&
%
"


JK)K)F
#!
F


"

!



F$

LMM,,,)%
)")+M
'&#
"N@!M
'&#
"@!)
$#

!

%&


$

$


)
)


"

%##

!

!!'&"

"
!$'!
&
!
%
%$



"'


!



%'



$

!"

"
)

)
'!'


&+#,=
"

"
!'&"

"
$&#
!
%
&
%
!#'&#
",@!G"
'
#!!
!
%,

*
$


%'!

#
#


!'!'

-&
%
"


JK)KO,

#
$

%>"


!$

!
?'
$

&
%'!!
#'
%-&
%
"


JJ)PQR)%%


##=

"

"
!'&"

"
$&,%%"

"
'&#
",@
'&#
"
,@!G"
P,%%


#=IKQ'
#!!
!
%,

*
$


%'!

##


!'!'

-&
%
"


JK)K)
*)
!G"

!#!!'&G"

"$#

"$




%
"$

&

*
$


%'!

##


!) 

S
T##,
##

""

!#
,
##

"

"
!'&"

"
,

'

"

"

!'&"

"
U!"'


!




$'&#
",@!'!'


"



JK)K)
)


"
"@
,#%!
%!
'##"$#,

+
!

!
"



JJ=JJHNJJV=JJJ)K=W=WK
%WVI
-&
%)
..097X:B11:43B:86
) 


"
=
%
!'&"

"

'
%=! ##@"$#

%""'

##"%!" ,@$
$#%&


"
M!'&"

"


"

"


,

!$

=!?'
%&
#


-&
%
"


JJV)
A.13.a
Packet Pg. 697 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 











 !"#$







# 
"%%&'()%$%


)
!
#*)
"
+#"



)) *!
%%


"

,
'&&*%! )


)
,)

)"
&
"
+#)
 $!
%)
)-$

 


).//0


)
!&!,)
% 
&





1"*

""*!&
"
*%"#&
#
 %%
"23.44445*

% 
!2
*

)

5

,
'

&*%! )


),)

)"
&
"#%






!"#$





"


# 
)%
"

)

%!
&*%!,)

%)
)-$

 .//0



)()
,
)


)
6
&*%)

789:;<=>?@?ABC>B<>ADCE;F<;GHIEJ:<AG>K?EA

#
"#

*
()")


).//
-$

 




%)
)


)
!L
M%%!"$
)

%*
()%)

*
)&,"
**%)
$%

,
'
$ )
%# )$#

%)&)

N"

)

)&(

)&
 %) !,
'O

(% "#$")"

*!&
"O&*%!*!&
"%

,%
(

)*") ")&)%
*#
*""
)

 "
%
)%,)




'"P
&&#)
!

()
"Q*

&


)
!L
M%%!
*)"
,)%%$& ()%$%
!)

"
 *

!
+#"
"

""%%$

&))&#&,

"

)"*
R


##



&
)"
&








,)%%$
+#)

*"

*!")

 "
%"
+#)
 $!

-$

 

#
"#

*
()")"


).//S
-$

 






"%%
)

"*%
!


)
!L
M%%!
&


,#
 %%
"2344445
TUVWXYXWZV[\WU\W]^TU_TU`aT[`YVUVTb^bTUVWXYcTUdVU_Wa\ZVee`YW[`YV _UVfWaZa[gcWgVUW`VeWe\V`VUha[V\i]`YVjaUVX`TUbTU`YVcTUdTUXUWb`a[cYaXY `YVcTUdVUaeVh_ZT]V\bTUW[]_kiZaXcTUd\T[Vk[\VU`YVXT[`UWX`i]`YV XT[`UWX`TUl





,)

*
()")"


)/44
-$

 (
!






,)%%$
+#)

"
#

*!&

&*"
)
)"&*%!"
7m9nEADG
,






"#

""#%






$!
"
*
() 
&)
))#%%

 



 #

)
)"
&

,"#

!$ "






"%%#
)""
)"


!


&
 &
)%%"

#

!

+#)
&
"




%)
)

&*
()  $!

)
!$
"%%$#
)" "#


)
#%*

&


+#)
&
"






Q
#&
""&!$&  
&
)&

)&)
%# )$#


%)&)

%)$)%)
!
%!" &"2$
 )



"+#
)%5


)
!


)
!1"
*







"
"#%

",


)"#

"
) &)
!$%)
)")&#


"%%
&)+#%
#
 *



2.44o5





)







"%%#
)""*

"
)"


!-$
 L

)%"
!&

&
)%%"

#

!
+#)
&
"




%)
)

&*
()  $!

)
!
A.13.a
Packet Pg. 698 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 










 !"



#!#$!%
&'(()*



!%

!%

%
!$+
 % ,##,
$$+

%,!%
!






 !,
!
$$ !,%
%,! -!!$ +#-+



!%
!!-++

-%
!%
!,!+$!,!,!

+ - 
 
$$+

%.

!$%



!/0

 -#
 -1%

#-+
 !2#

#
!
+
!!0#
#-+

 !2#

#
!
+
!! 
#

 

3!

40
5$!


!
!+
!%
!67(
 -##%%$
#
 $%% +!8%
#-+



+0
#
#-+
!


#!
!+
!%
!67(

-%%$#-+
#%


!
#
 !
#
3
!%#
!
%
9960::(&*0
-#

 -!

#




!%
0


!+22%
.
1%



!"
!#
-#-
 


!
+
 1

!
%!
##%
!!
%$+

$.!


!+0

3
%



%!



!%

!%,



%
-#

 -##
%!#

!"





!%

!%0



!
 -%/. ##-+
!+$
- %03!+-#

#$ +


!
+;
-#
-!#%!$!




!%
!

!/-+!!%0

!

-#

 $!3#




!
+!


%
,1

,
!
,!
#%




!%
5%

!

!/
-$!!#

!
#!
 +
.+%

- 
#
 .3
%+
%
%
,1

,

!
,!#%




!%
5%

0

!
+
!

!!




- 
#
#!

-#
+
%%!,!
,!



+0

4$

!"

+$!!

+$$!
-$

 -%!+-#
%3!$+
- 
!
#!



!%
,



!%
!
 $!$
+

!
%$+

-#!
 

!<%$+
-
!
#0


#+-#-%
%
,!

#+


!
,

$



+,
-%2!$- !
%%$
- ,



!%
!
 ,.


&'(*
 #!5+

!!%3
%!



+,$!3#.!

#%







%





+




!%
!
%
!#.!##

!
!

-#=

!.




!%
!
 -#





!%
0>
!

!$+

 -###
!
. -#
#!

!%


 .
!
+&*"
 #%%$
#-+



+0


!%
!!



?-!#@
!
+
##



!!%#


%
#


!
!!!!%$
!$ +,#
 
-%#!#$!



!
0 
!%
!
!

!!


#-#!$!
- 





!%
!#

!
+,#


+

!+;$!3%
#+$+
-#
!$!!%-#
 
$$ +


!
0

3

!+ 


-
.

$!
!!

-!%


!
,%
$!
+. -!
.


!+;

 

0
0 ABCDEFDGHGEGHIJIKDLMENHGHLD
0

!



 !

- %

!%

#
%
((,



!%
!. -
$!

#


-


%
!
!+.

 #-+



+@!
O +

!$!!%
#!

!
0

!"

#1$



!%
!,%
!
"
3 





.

 #
 -#$
#.



+@!O +,!.



!#! +%
!
!#-/

%!.

,.

 $+
%





!%
!0
A.13.a
Packet Pg. 699 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 








 !

"!

"

#
#$
%

# %!!
#!
$% !
$
#

#
&'(%)*
#+#
$,"#-
*
# #$!#


 $.
,

#
 /"

#$+#$$.

# ,#$ #$"0!

$
%

#

%!!"%"#

!1#
#0 


"

$
+#

1 %%!$,#$ %!!

*#0$
*
$#$ 

#
 %
#

%
#

%!!
*%

01 ##
1
%
#%

02(3$0 
%

+#
1
$$%
$

 
"

 

 
+#0%1
!$

$
#

!0"1
%%!$%
"

$ 

 
$.
$
## 
1,%
 
1 %!!"*
#$"01

# 
1
+#
#
+1%
%

" #
!!0
+
!
%
+# 
%
#

#((%

"!

#


$
456789:;<7:8;=>?@<A@?@:B
%
#

%!!"
 .#
"!
!!$+ ..!#$C
.
.
0%


 

!%
!
#!
#

"
"!%
#

#$C
#0

"#
!#%
#


###
#1
%%.

+#
#$
%


+##0#$!!


#

.

$+$# 
0"0%D




+$0
%$+ %!!"

#
%$#$.

+$%
#

E !
F.# ,#$ %!!"+.!$1
%
#%
+!
+
 "!
%$"0%D



4G6789:;<7:8;>?@7H9>H

#



I

$"0!1"!
# $,#$

!$"0%
#

E

J
# 
$
#

1 !!+.!01
%!!..!
"!!
#
#!1 ,#$


!
# #0I

# #
#
#
#

+0"


$%


,

#

E
J
# 
$,KL&

#

-D

*,

+#,
KMLN
O
!
#$$
 P

F'(((,

+#,
KML'
4Q67?<@R;H>8?S:@89T;87HUS;H>


#K(%

"!

#

$  
%%
I

+# 
!
+
"+
$ "0#

#.
"!
1
- .
VP
#

+


#
%W
 #"!$
+#
#
..
%!
+W
X.#

.!
+,.
"!
#
0+
W#$

 #"!
*
1W#$.
*
$
1

# +#%#

1 %
#M$0 

.%!
+


#0
#$
.
$.

#!
+,.
"!
#
0+
+-.0+#1
%
#'(
$0 %.
"!
#
0E

#%1

# +#
D%#

$
.
 %.
"!
#
0E 1

# +#,

%.
"!
#
0
!

 .#$,%#

+0$+#$W#
#
+!#
#+#$#


!+#%


#$
.
W
%.
"!
#
0+
%$
!%+#$#
#
#1
%
#($0 %
$+#$
A.13.a
Packet Pg. 700 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 








!"#
##$%#&&'


(

$)
*)
*
)+

,"!&)


%
("#
,*-$'*


#

(

$

%


,*



)&(


*(
#

$#,"

%,%(

$"

"
$#,"
$,*



)&(("#
!($'



. $%#

(

$)
*)
*
)
/
*

(

$)
*)
*
)+
%$#,"
$,*



)&(0#
&&!
#"!(

$


1!
$
($

0
($

#"
#"))##"&+

,*
#

)&(


*(

$#,"
#
&&!
#"!2)

,,&)!&,*)$"*#"
#$
)

3 45#

"
*%
$)

*)
"&6
&"*,"!&)


%
*#,
$
)&('




(,*$#$#)*!$

)

3 40#
&&*#"&


)&(!
$($*2)
$

#

*
%0
7("

#

,$

(&%(

*#
&&!*

*#

8,*)

,*%*

A.13.a
Packet Pg. 701 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 







!"#$"%#&'(%
)
*+,-./0+12/0-,34567+8-/,/./+8.6/,+850+5-04.*6,04+-54 6+96+12:444861;48614//4..* /.2<+4/+-6./09*6=30-2
+6;/-+6-*.*,04+-56+12:4>3+.4.*63*3..*.61.* -0.6-.9

A.13.a
Packet Pg. 702 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 





A.13.a
Packet Pg. 703 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 






A.13.a
Packet Pg. 704 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 







!"#$%
&'
()*+,,-.-/,0,.12.3-/-343215**6743/..5-,,-.-/-/107.-/18. -/7*46.1.-//6,0-,190,,36:+.5
/.,7.,/615**-/7*466.-*1
107--7..56.12.5107--7*7.-/12/67,,7.-;7.-/.)/2-/+()*+ ,,-.-/,0,.115**:14:3-..6..5<-,7.,.0,)1/6*/6170=3;*(, :+.517/6>,)6+.5>)2/8?9>)-/,,,1(
(@,/>1.7+7*-/
?(5
4:*-714,71
68

92<-;-1-/A2
7.-/1B?AAA.5,45B?CDA
,E4-,1.5..5
-.+F,/G**+6-;,.,3*/6-**1-.+0,7/.8HAI9 .51*-6>1.2-/7*46-/,/>1.2/,.6>-.5-/-.1J4,-16-7.-/( (,.504,011.5-1,3/.23.,-*16-/61K,/>1.L15** -/7*46**0*/.0,.18-((.,-33-/120,4/-/12,117*-00-/12.7(9,3;6 ,3,3/.1-.1:+.5
/.,7.,2,/+14:7/.,7.,1.5,4/6,2-/.5
0,,3/7,3/.M1
70,)(
(
/.,7.,2,/+14:7/.,7.,.5,4/6,215**601-.**,/>1. /,.6>5-*0,,3-/.5,3/.M1
70,).*/6170
3.,-*,7+7*-/7/.,2,,411-6,/>1.-/*>4*3//,(

/.,7.,2,/+14:7/.,7.,.5,4/6,215**:1**+,10/1-:*,** 71.1-/74,,6-/730*+-/>-.5.5-1,E4-,3/.(
B(5
/.,7.,15**14:3-.F/.5*+@,/>1.0,.11.,.55,-/( 5
/.,7.,15**0,;-6,10/11.**-/,3.-/,E41.6.5,-//6 15**-/7*462/10,.F/.5*+@,/>1.0,.,32/+,/>1. /,.6.5,45.50,.-/1/+14:7/.,7.,10,,3-/>,)4/6,

/.,7.,M1
70,)(
H(F/.5*+@,/>1.,0,.115**:14:3-..6..5<-,7.,. 0,)1/6*/6170=3;*(,:+.5./.56+753/.52/8?93/.5 -/,,,1(

(3/.5*+,0,.2.3-/-343215**6743/..5>,)0,,36:+.5 /.,7.,
/615**7/.-/6.-*6-/,3.-/1-1617,-:6-/.5,3..7565,./6 /+.5,,*;/.-/,3.-/:4..5
/.,7.,M1>,).-6/.--65N,612
753-7*412/6741.3,730*-/.1(
-6,0,.15**:-/,3.770.:*
..5<-,7.,(F/.5*+,0,.115**:14:3-..6..5<-,7.,. 0,)1/6*/6170=3;*(,:+.5./.56+753/.52/8?93/.5-/ ,,,1(
<(
1.-7-6O1,0,.115**:730*.6/614:3-..6-/77,6/7>-.56,*2

1..2/6*7**>/67/1-1./.>-.5.50,;-1-/15,-/(
(
/.,7.,15**,,.17.-/1-/7*4665,-//6/14,66-.-/*,0,.12- /711,+2,14:3-..6..5<-,7.,2100,0,-./67/1-1./.>-.5.5-1 ,3/.2/6.5,/7-121,E4-,6:+*>2./14,730*-/7>-.5** 6,*21..2/6*7**>1(
A.13.a
Packet Pg. 705 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 







!"#$%&'(% $) *+'",
# -.!/-$01&

2 3456789:5;
7<=>?8@=AB
7C3A=D3C=8
B7<=8@: =ABEFC:G7 DHI8@J7<@5J<;KJ<387 =


L
M
GN 6
M
N ;

O%/#$!&
P
847:MHFQ7P 7A4MHFQ7P
7<;A3:4573:

R#$+02ST/
U
V %W
*+02U&$!XU
S% /$!.Y/$!%&0P D4A74@P
7A43CA438
@43:=
Z#[ U0P D4\=]84@P 7P ^7@45BP D4
3583@P D4A74@ __`a __`b __`c __`d __`e A.13.a
Packet Pg. 706 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 








!"##
$%&
#'#("
)"*
+,-./0122-3
/45670859:
/;+95<+;+5+0
:/450820859:=>;2?/ <@AB,C8-9C>0,C3>0,C+0///5

D'EFGHIJEKLMNONN

H

"%P
"J%*#Q
RSS"#&&Q
D

#JT*U#"Q


V#%"
?
@/9/0W5,

79,+0
?>@0,/0W5,0/,8/>X;
5@/9YX-W+C,Z
7X5?
/
,05

?[>388/55308:C00@>X//9-92

0,/9,/99:,+0/0W5,

0,/9,/[>
88/55

C0[@>X/
\?>@0,/0W5,]5@/9:/8@9,5Y>@29C3
9>:5,3,:8/55+03085+2>08>0,53
,9?Z@/0+5C8,
/^9,
YX-W+C,Z
7X5?
/
,05

_?[>388/55308:C00@>X//9-92
0,/9,/5@::2-+0/0W5,]5@/9 :/8@9,5,
/^9,Y+8+/0,/>X;Z

0,/9,/[>
88/55

C0[@>X/
`?[@>X/,+>5,@/>W8,C+5>0,C
a?[@>X/,+>5,@/>W8W+,C@,92+::+05 9@C,

A.13.a
Packet Pg. 707 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT 






 !
"#
$
%
!&'()
"*'+
,
- !.+'/.'"
,
!&'"*$ '+
,
01.
$2!
3/4
567*


+1"%61"
!
'

89:;<=>9?@ ABCDAEF %7
GHIJ
K
"!$

B41
!
KC!
+B41
!KL"
!

IJ I H
K/

M'N
K!

OPJH=K QR
*

KC!1R,4"
SQ *
K)
!S

"
K+2

JT
K/

M'N
K!

K !*4+R

"$'
K14"R

!

K
!,
8UJHVUK/

M'N
K !*4+'
*
K14"'
*K!

KC
!

,'

<
IJUK/

M'N!
+.*
K!

R$+"
K
1,$
"R+"K/

+!
*
K
!
+.
+"
WITVUK/

M'N"
*
K!

KD
X!*,

K #
-/"
*K/


"
*K/

+!
*
K
!
+.
+" Y;;Z[ Y;;Z\ Y;;Z] Y;;Z^ Y;;Z_

A.13.a
Packet Pg. 708 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT EXHIBIT B – CITY RESPONSIBILITIES - Page 1 of 1
EXHIBIT B - CITY’S RESPONSIBILITIES
PARKS LANDSCAPE MAINTENANCE 2023

1. AGREEMENT SUPERVISION
The Agreement shall be administered on behalf of the Parks and Community Services Director of the City of Moreno Valley, or his/her delegated representative(s), hereinafter designated as "Director." The Director will decide all questions, which may arise as to the manner of performance and completion per schedule, acceptable fulfillment of the Contract by the Contractor, interpretation of the Specifications, and compensation to include completion of work by alternate sources.

2. IRRIGATION CONTROLLER SYSTEMS
The City shall manage the operation of all automatically controlled irrigation systems, including but not limited to irrigation controller programming and scheduling. The Contractor shall monitor the operation of, and maintain said irrigation systems as required by the Director. The Contractor shall operate manually controlled irrigation systems as directed by City field staff.

3. UTILITIES
It shall be the City's duty to provide the utilities necessary for irrigation (i.e., water, electricity, and communications) and to maintain their appurtenances (i.e., water and electrical meters and backflow devices). The City will pay the water, electricity, and communications costs used in the sites covered by this Agreement. The Contractor shall report any interruption of these services for whatever reason immediately upon Contractor's observation of same to the Director.

4. RESTRICTED PESTICIDE MATERIALS/PERMIT/USE CONSENT
A. The City shall maintain in full force and effect throughout the entire term of the Contract a valid Restricted Materials Permit issued by the Agricultural Commissioner of the County of Riverside on behalf of the California Department of Pesticide Regulation. The Contractor shall comply with all permit conditions that pertain to any of the pest control materials listed on said permit that may be used in the course of Contractor's operations under this Contract.

B. Director must give consent in writing prior to application of any Category I pesticide.

A.13.a
Packet Pg. 709 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT EXHIBIT C – PAYMENT TERMS - Page 1 of 13

EXHIBIT C - TERMS OF PAYMENT
PARKS LANDSCAPE MAINTENANCE 2023

1. Contractor’s Compensation
A. The Contractor's compensation shall not exceed $6,503,403.74.

B. Compensation shall be based on the Bid/Compensation Schedule.

C. Written notice of the compensation amount for the next fiscal year shall be provided to the Contractor at least thirty (30) days prior to the end of each fiscal year.

D. Any request for increase in the Contractor's compensation shall be based on an annual inflation adjustment, calculated for the previous calendar year, based on the Riverside-San Bernardino-Ontario Regional Consumer Price Index for All Urban Consumers, as published by the Department of Labor's Bureau of Labor Statistics.

Any such request shall be made to the City in writing no later than May 1 of each year. Upon approval, the adjustment would be effective July 1 of the following fiscal year.

E. The Contractor will obtain, and keep current during the term of this Agreement, the required City of Moreno Valley business license. Proof of a current City of Moreno Valley business license will be required prior to any payments by the City. Any invoice not paid because the proof of a current City of Moreno Valley business license has not been provided will not incur any fees, late charges, or other penalties.

Complete instructions for obtaining a City of Moreno Valley business license are located at: https://moval.gov/departments/financial-mgmt-svcs/svc-biz-license.html F. The Contractor will electronically submit an invoice to be paid monthly per site based upon successful performance of the maintenance services provided in accordance with an approved service schedule for each area/site and in compliance with the terms and provisions of this Agreement. By the tenth of each month the Contractor shall submit to the Director detailed reports of the following:
a. Maintenance performed, which must include the location, area or site of such maintenance.
b. Greenwaste.
c. Complaints received.
d. Hazards noted.
e. Chemicals used in the prior month.
f. Invoice for service, which lists in detail the site (e.g. Park Site or Facility location and address), service performed and cost in accordance with the Agreement price, which shall become the basis for payment.

A.13.a
Packet Pg. 710 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT EXHIBIT C – PAYMENT TERMS - Page 2 of 13
No payment(s) shall be made until the reports, listed herein, have been submitted and approved. At no time will the City pay for more services than have been satisfactorily completed and the City's determination of the amount due shall be final.

G. The Contractor will submit all invoices electronically to Accounts Payable staff at [email protected]. Accounts Payable questions can be directed to 951.413.3073.

The Contractor will electronically submit copies of all original invoices and reports to the Parks & Community Services Department, Parks & Landscape Services Division at [email protected] Calls may be directed to (951) 413-3702.

H. The Contractor agrees that City payments will be received via Automated Clearing House (ACH) Direct Deposit and that the required ACH Authorization form will be completed prior to any payments by the City. Any invoice not paid because the completed ACH Authorization Form has not been provided will not incur any fees, late charges, or other penalties. The ACH Authorization Form is located at: Microsoft Word - VIDE - VENDOR SET-UP REQUEST CHECKLIST (moval.gov)
I. The minimum information required on all invoices is:
a. Vendor Name, Mailing Address, and Phone Number
b. Invoice Date
c. Purchase Order Number
d. Vendor Invoice Number
e. City-provided Reference Number (e.g., Project Contract No.) f. Date services were performed.
g. Location where services were performed, including Name of Park or Facility, and address of location or general vicinity where services were performed.
h. Month and/or Quarter serves were rendered with amount(s) due organized to correspond with the Contract/Purchase Order line items (e.g., July Base or Additional Work).
i. Detailed work hours by class title (e.g., Manager, Technician, or Specialist), services performed and rates, explicit portion of a contract amount, or detailed billing information that is sufficient to justify the A.13.a
Packet Pg. 711 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT EXHIBIT C – PAYMENT TERMS - Page 3 of 13
invoice amount; single, lump amounts without detail are not acceptable.
j. Supporting documentation including: receipts for materials purchased, summary tables demonstrating the calculation of total amount due, including description and cost breakdown by job performed within each area, the calculation of mark-up, and the addition of any applicable labor cost. Note: mark-up shall not include tax, shipping or labor. k. If written authorization was required prior to the commencement of work, documentation of the approval is to accompany the subject invoice. Documentation shall include final approved proposal, and corresponding written authorization (e.g., fully executed proposal or proposal accompanied by the corresponding email approval.) J. The City shall pay the Contractor for all invoiced, authorized professional services within thirty (30) days of receipt of the invoice for same.

K. Reimbursement for Expenses. Contractor shall not be reimbursed for any expenses unless authorized in writing by City.

L. Maintenance and Inspection. Contractor shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identifiable. Contractor shall allow a representative of the City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Contractor shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.

2. ADDITIONAL WORK
A. During the term of this Agreement the City may, at its discretion, authorize the Contractor to perform certain Additional Work as described herein, in addition to the work set forth in Exhibit A.

B. If the City determines it to be in the City’s best interest, said Additional work may include: Acts of God (i.e., earthquake damage, storm damage), or vandalism, theft, and acts or omissions by third parties.

C. Compensation for all such Additional Work shall be calculated either at the prices set forth by the Contractor and included herein or at a price based on the Contractor’s written estimate (lump sum, time and materials, or cost-plus basis), as determined by the Director. Written estimates shall contain sufficient detail to justify the cost (i.e., quantities, adequate work description) and shall contain the location (Park, Facility or general vicinity) where services are to be performed.

Except as set forth below, the Contractor shall not perform any such Additional A.13.a
Packet Pg. 712 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT EXHIBIT C – PAYMENT TERMS - Page 4 of 13
Work services without first obtaining express written authorization from the City.

D. Notwithstanding the above requirement for prior written authorization, when a condition exists wherein there is imminent danger of injury to the public or damage to property, the City may verbally authorize the work to be performed upon receiving a verbal estimate from the Contractor. Within twenty-four (24) hours after receiving a verbal authorization, the Contractor must submit a written estimate to the City for written approval. Whenever immediate action is required to prevent impending injury, death, or property damage to the facilities being maintained, the City may, after reasonable attempt to notify the Contractor, cause such action to be taken by the City’s work force.

E. The Contractor shall maintain additional landscape areas the City may add to this Agreement at a unit price comparable to landscape areas described herein. In the event that notification is made, at other than the beginning of a monthly period, the unit cost as set forth by Contractor in the Bid Schedule shall be prorated from the day the Contractor commences work on the additional areas.

F. Routine repairs to project irrigation system(s) shall be considered Additional Work to the extent that the Contractor shall charge only for materials used to perform said repairs at Contractor’s cost plus a percentage of that cost, as set forth in herein. For the purposes of this Agreement, routine irrigation repairs are defined as repair and/or replacement of existing sprinklers, sprinkler components, and/or non-pressurized pipe, and/or fittings (“lateral lines”) that have been rendered inoperable due to: a) normal “wear and tear”, and b) vandalism or theft (which includes acts or omissions by third parties).

G. Except as specifically approved by subsequent action of the City Council and/or District Board of Directors, the Director may not authorize Additional Work in excess of the not to exceed amount.

3. PAYMENT DEDUCTIONS
The City may deduct payment to such extent as may be necessary to protect the City from loss due to:

A. Work required in the General or Technical Provisions which is not performed, not performed to the standards set forth therein, not performed at or within the time(s) specified therein or is incomplete.

B. Claims filed or reasonable evidence indicating probable filing of claims by laborers, materialmen, subcontractors, or third parties.

4. NON-PERFORMANCE PENALTIES
A. The Contractor may become liable for payment of non-performance penalties for failure to: provide adequate communications; provide adequate work area safety A.13.a
Packet Pg. 713 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT EXHIBIT C – PAYMENT TERMS - Page 5 of 13
including but not limited to wearing of appropriate work attire; complete "Specialty" operations in a timely manner as set forth in the General Provisions; submit notifications or reports required by the Agreement, or General Provisions at the intervals and/or frequencies set forth therein, or; perform work as required by the General Provisions at the intervals and/or frequencies as set forth therein, or as directed by the City. For each of the categories set forth hereinabove, the penal sum of $100.00 (one hundred dollars) per working day will be assessed for each working day the deficiencies remain uncorrected.

B. If non-performance penalties are to be assessed, the Contractor will be notified immediately by written email, facsimile transmission, letter, or by telephone.

C. The Contractor will not be assessed non-performance penalties for delays caused by the City or by the owner of a utility to provide for the removal or relocation of utility facilities.

D. Excessive Utility Usage. Contractor shall pay for all excessive utility usage due to Contractor's failure to monitor irrigation system malfunctions or unauthorized increases in the frequency of irrigation. The excess cost will be determined by comparing the current usage with the historical usage for the same time period.

The excess cost factor, to be deducted from the payments to the Contractor, will be presented by the Director to the Contractor prior to actual deduction by the City to allow for explanations.

5. TIME FOR PERFORMANCE
The Contractor hereby agrees to commence work pursuant to this Contract within fourteen (14) calendar days after the date of authorization as specified in the Notice to Proceed and to diligently prosecute the contracted work noted on the Bid Schedule.

6. COMPENSATION DETAIL - COMPENSATION SHALL BE BASED ON THE

FOLLOWING SCHEDULE
A.13.a
Packet Pg. 714 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT Item No Description Reference Unit of Meaure Quantity Unit Price Annual Price Item Code
Base Work
19 Planter 21,838 sq. ft. Monthly Cost 12 $609.00 $ 7,308.00 20 Turf ‐  4,610 sq. ft. Monthly Cost 12 $1,942.00 $ 23,304.00 21 Planter ‐ 73,761
Turf ‐ 46,126 Monthly Cost 12 $2,051.02 $ 24,612.24
22 Monthly Cost 12 $460.72 $ 5,528.64
23 Planter ‐ 14,915 sq. ft. Monthly Cost 12 $416.00 $ 4,992.0024 Planter ‐ 66,950 sq. ft. Monthly Cost 12 $1,818.00 $ 21,816.00 25 Planter ‐ 23,167 sq. ft. Monthly Cost 12 $646.00 $ 7,752.00 26 Planter ‐ 9,690 sq. ft. Monthly Cost 12 $270.00 $ 3,240.0027 Planter ‐7,895 sq. ft. Monthly Cost 12 $220.00 $ 2,640.0028 Monthly Cost 12 $295.46 $ 3,545.5229 Planter ‐ 21,601 sq. ft. Monthly Cost 12 $602.00 $ 7,224.0030 Planter ‐ 7,830 sq. ft.

Turf ‐ 3,980 sq. ft. Monthly Cost 12 $236.07 $ 2,832.84 31 Planter ‐ 11,555 sq. ft. Monthly Cost 12 $332.00 $ 3,984.0032 Planter ‐ 42,382 sq. ft. Monthly Cost 12 $1,182.00 $ 14,184.00 33 Planter ‐ 1,875 sq. ft.

Turf ‐ 3,066 sq. ft. Monthly Cost 12 $65.91 $ 790.92
34 Planter ‐ 17,056 sq. ft.Turf ‐    3,478 sq. ft. Monthly Cost 12 $496.33 $ 5,955.96 35 Planter ‐ 14,259 sq. ft. Monthly Cost 12 $350.00 $ 4,200.0036 Quarterly Cost 4 $12.82 $ 51.28 37 Turf ‐  158,229 sq. ft. Monthly Cost 12 $541.14 $ 6,493.68 38 Turf ‐    66,317 sq. ft. Monthly Cost 12 $226.80 $ 2,721.6039 Turf ‐ 113,168 sq. ft. Monthly Cost 12 $387.03 $ 4,644.3640 Turf ‐ 564,147 sq. ft. Monthly Cost 12 $1,929.38 $ 23,152.56 41 Turf ‐ 205,846 sq. ft. Monthly Cost 12 $704.00 $ 8,448.00 42 Turf ‐ 299,908 sq. ft. Monthly Cost 12 $1,025.68 $ 12,308.16 43 Turf ‐   18,000 sq. ft. Monthly Cost 12 $61.56 $ 738.72 44 Turf ‐ 240,500 sq. ft. Monthly Cost 12 $822.51 $ 9,870.12 45 Turf ‐   98,305 sq. ft. Monthly Cost 12 $336.20 $ 4,034.4046 Turf ‐   45,068 sq. ft. Monthly Cost 12 $154.13 $ 1,849.5647 Turf ‐ 215,452 sq. ft. Monthly Cost 12 $736.84 $ 8,842.0848 Turf ‐ 273,549 sq. ft. Monthly Cost 12 $935.54 $ 11,226.48 49 Turf ‐ 162,059 sq. ft. Monthly Cost 12 $554.24 $ 6,650.88 50 Turf ‐ 183,642 sq. ft. Monthly Cost 12 $628.00 $ 7,536.0051 Turf ‐ 197,421 sq. ft. Monthly Cost 12 $675.17 $ 8,102.0452 Turf ‐ 353,967 sq. ft. Monthly Cost 12 $1,210.57 $ 14,526.84 53 Turf ‐ 233,416 sq. ft. Monthly Cost 12 $798.28 $ 9,579.36 54 Turf ‐ 105,645 sq. ft. Monthly Cost 12 $361.31 $ 4,335.7255 Turf ‐ 125,525 sq. ft. Monthly Cost 12 $429.30 $ 5,151.60 Planter ‐ 12,255 sq. ft.

Quarterly Weed Abatement ‐ 74,669 sq. ft.Planter ‐ 6,721 sq. ft.Quarterly Weed Abatement ‐ 68,215 sq. ft.Quarterly Weed Abatement ‐ 7,503 sq. Ft.

TurfTurfTurfTurfTurfTurfTurfTurfTurfTurfTurfTurfTurfTurfTurfTurfPlanter/TurfPlanterWeed AbatementTurfTurfTurfPlanter/Weed Abatement PlanterPlanter/TurfPlanterPlanterPlanter/TurfPlanter/Weed Abatement PlanterPlanterPlanterPlanterPlanterPlanterPlanter/TurfPlanter/Turf Pedrorena ParkRidge Crest Park
Sunnymead Park
Towngate Memorial Park
Victoriano ParkWestbluff ParkBayside Park
Bethune Park
El Potrero Park (East & West)
Facilites ‐ Utility Field Office ‐ 28020 Bay St.

Facilites ‐ Veterans Memorial ‐ Between City Hall & CRC Facilites ‐ Kitching Electric Substation ‐ 17180 Kitching St.

Facilites ‐ Fire Station 2 ‐ 24935 Hemlock Ave.

Facilites ‐ Fire StaƟon 6 22250 Eucalyptus Ave.Facilites ‐ Fire Station 48 ‐ 10511 Village Rd.

Facilites ‐ Fire Station 58 ‐ 28040 Eucalyptus Ave.

Facilites ‐ Fire Station 65 ‐ 15111 Indian Ave.

March Field Community Center
Community ParkMorrison ParkParque Amistad ParkJFK ParkMarch Field Park Facilites ‐ Fire Station 91 ‐ 16110 Lasselle St.

Facilites ‐ Fire StaƟon 99 13400 Morrison St.Facilites ‐ Nandina Electric Substation ‐ 24417 Nandina Adrienne Mitchell ParkFairway Park
Gateway ParkHound Town Dog Park
Facilites ‐ Moreno Beach Electric Substation ‐ 27913 Cottonwood Facilites ‐ Library ‐ 25480 Alessandro Blvd.

Facilites ‐ Public Safety Building (PSB) ‐ 25075 Calle San Juan De Los Lagos Facilites ‐ Senior Center ‐ 25075 Fir Street
Facilites ‐ Conference and Recreation Center (CRC) ‐ 14075 Frederick St.

Facilites ‐ Amphitheatre ‐ 14075 Frederick St.Facilites ‐ City Yard ‐ 15670 Perris Blvd. & 25180 Santiago Dr.

EXHIBIT C - PAYMENT TERMS - PAGE 6 OF 13
A.13.a
Packet Pg. 715
Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO Vendor ID Company Name Address City Zip Code
102621 Merchants Landscape Services, Inc. 1510 S. Lyon St. Santa Ana 92705 Respondee Respondee Title Respondee Phone Respondee Email Mark Brower President 714-972-8200 [email protected] Item No Description Reference Unit of Meaure Quantity Unit Price Annual Price 1 Planter ‐ 14,180 sq. ft. Monthly Cost 12 $395.00 $ 4,740.00 2 Planter ‐ 37,938 sq. ft.

Turf ‐ 33,205 sq. ft. Monthly Cost 12 $1,208.75 $ 14,505.00 3 Planter ‐ 20,736 sq. ft.

Turf ‐  17,976 sq. ft. Monthly Cost 12 $659.61 $ 7,915.32 4 Planter ‐ 55,451 sq. Ft.

Turf ‐ 18,700 sq. ft. Monthly Cost 12 $1,606.90 $ 19,282.80 5 Planter ‐ 12,037 sq. ft. Monthly Cost 12 $335.00 $ 4,020.00 6 Planter ‐ 43,616 sq. ft.

Turf ‐ 66,805 sq. ft. Monthly Cost 12 $1,495.29 $ 17,943.48 7 Planter ‐ 37,938 sq. ft.

Turf ‐  79,521sq. Ft. Monthly Cost 12 $1,419.03 $ 17,028.36 8 Planter ‐ 78,534 sq. ft.

Turf ‐ 41,689 sq. ft. Monthly Cost 12 $2,280.27 $ 27,363.24 9 Planter ‐ 92,262 Monthly Cost 12 $2,525.00 $ 30,300.00 10 Planter ‐ 31,505 sq. ft.

Turf ‐ 36,110 sq. ft. Monthly Cost 12 $1,042.94 $ 12,515.28 11 Planter ‐ 26,762 sq. ft.

Turf ‐ 27,869 sq. ft. Monthly Cost 12 $872.52 $ 10,470.24 12 Planter ‐ 25,449 sq. ft.

Turf ‐ 132,303 sq. ft. Monthly Cost 12 $1,310.65 $ 15,727.80 13 Planter ‐ 12,103 sq. ft.

Turf ‐ 83,003 sq. ft. Monthly Cost 12 $713.83 $ 8,565.96 14 Planter ‐ 28,495 sq. ft.

Turf ‐ 125,205 sq. ft. Monthly Cost 12 $1,363.43 $ 16,361.16 15 Monthly Cost 12 $526.00 $ 6,312.00
16 Planter ‐ 6,070 sq. ft.

Turf ‐ 40,754 sq. ft. Monthly Cost 12 $354.02 $ 4,248.24 17 Planter 1,080 sq. ft. Monthly Cost 12 $30.00 $ 360.00 18 Planter 5,900 sq. ft. Monthly Cost 12 $164.00 $ 1,968.00 Planter ‐ 15,502 sq. ft.

Quarterly Weed Abatement ‐ 59,364 sq. ft.

Planter/TurfPlanterPlanterPlanter/TurfPlanterPlanter/TurfPlanter/TurfPlanter/TurfPlanter/Weed Abatement Planter/TurfPlanterPlanter/TurfPlanter/TurfPlanter/TurfPlanter Aqueduct Bikeway ‐ Delphinium along Perham to John F. Kennedy (Open Space between landscaped areas not included)
Aqueduct Bikeway ‐ Vandenberg to Fay (Open Space between landscaped areas not included)
Aqueduct Bikeway ‐ Fay to Gentian
Aqueduct Bikeway ‐ Racho Verde Park ‐  Lasselle St. & Cremello Way (Future Site) Aqueduct Bikeway ‐ Gentian to Santiago (Future Site)
Aqueduct Bikeway ‐ Iris Park ‐ Iris to Red Maple (Future Site) Bid /compensation Schedule
Item Code
Base Work
PlanterPlanter/TurfPlanter/Turf
California Aqueduct ‐ North Aqueduct ‐ Elsworth to Dracaea California Aqueduct ‐ Pan Am Aqueduct ‐ Pan Am to Baywood California Aqueduct ‐ South Aqueduct A ‐ Red Maple Ln to Krameria Ave.

California Aqueduct ‐ South Aqueduct B ‐ 16726 Via Pamplona California Aqueduct ‐ SCE & Old Lake ‐ Old Lake Road s/o Sunnymead Ranch Parkway and Pigeon Pass, and Sunnymead Ranch between Gateway Park to North of Old Lake Road
Facilities ‐ Animal Shelter ‐ 14041 Elsworth St.

Facilites ‐ March Annex Building ‐ 4th & W St. Building 823 (MARB) Facilites ‐ City Annex ‐ 14331 Frederick St.

Facilites ‐ City Hall ‐ 14177 Frederick St.

CFD ‐ Towngate Community Center ‐ 13100 Arbor Park Lane CFD ‐Towngate Aqueduct Bikeway ‐ On Eucalyptus Avenue, 300 feet east of Arbor Park LaneAqueduct Bikeway ‐ Bay Ave. to Graham (Open Space between landscaped areas not included)
EXHIBIT C - PAYMENT TERMS - PAGE 7 OF 13
A.13.a
Packet Pg. 716
Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO Item No Description Reference Unit of Meaure Quantity Unit Price Annual Price Item Code
Base Work
56 Turf ‐ 176,434 sq. ft. Monthly Cost 12 $603.40 $ 7,240.80 57 Turf ‐ 285,385 sq. ft. Monthly Cost 12 $976.02 $ 11,712.24 58 Turf ‐ 169,248 sq. ft. Monthly Cost 12 $578.83 $ 6,945.96 59 Turf ‐ 288,000 sq. ft. Monthly Cost 12 $984.96 $ 11,819.52 60 Turf ‐     9,720 sq. ft. Monthly Cost 12 $33.24 $ 398.88 61 Turf ‐   78,269 sq. ft. Monthly Cost 12 $267.68 $ 3,212.16 62 Turf ‐ 263,314 sq. ft. Monthly Cost 12 $900.53 $ 10,806.36 63 Turf ‐ 251,391 sq. ft. Monthly Cost 12 $859.76 $ 10,317.1264 Turf ‐ 106,269 sq. ft. Monthly Cost 12 $363.44 $ 4,361.28 65 Turf ‐   58,945 sq. ft. Monthly Cost 12 $201.59 $ 2,419.0866 Turf ‐   25,794 sq. ft. Monthly Cost 12 $88.22 $ 1,058.6467 Turf ‐   35,530 sq. ft. Monthly Cost 12 $124.65 $ 1,495.80 Total $48,807.57 585,588.28 $
Additional Work Price List
68 each 1 $15.0069 each 1 $35.00
70 each 1 $75.00
71 each 1 $150.00
72 each 1 $425.00
73 each 1 $1,500.00
74 each 1 $50.00
75 each 1 $65.00
76 cubic yards 1 $35.00
77 man hour 1 $30.0078 man hour 1 $55.0079 percent 1 $15.0080 Regular Service ‐ Planter Monthly Cost per
Square Foot 1 $0.03
81 Regular Service ‐ Turf
Monthly Cost per
Square Foot 1 $0.03
82 Mowing only
Monthly Cost per
Square Foot 1 $0.00
83 Weed Abatement
Quarterly Cost perSquare Foot 1 $0.05
Additional Work in Landscaped Areas, as needed
Additional Work in Landscaped Areas, as needed
Additional Work in Landscaped Areas, as needed
Additional Work in Landscaped Areas, as needed
24” box tree in place (stakes included)
36” box tree in place (guy wires included)
Flat of ground cover in place
Fertilizer applicationPlanter bed mulch in placeAdditional laborAdditional Irrigation Technician Irrigation Repair ‐ Parts at Cost Plus a Specified Percentage Mark Up One (1) gallon shrub/vine/ground cover in placeFive (5) gallon shrub/vine/ground cover in place Five (5) gallon tree in place (stakes included)
Fifteen (15) gallon tree in place (stakes included)
TurfTurfTurfTurfTurfTurfTurfTurfTurfTurfTurfTurf
Shadow Mountain Park
Towngate II ParkVista Lomas Park
Santiago ParkTr. 31823 Park (Future Site)
Tr. 38236 Park (Future Site)
Celebration ParkLasselle Sports Park
Patriot Park
Rock Ridge Park
Weston ParkWoodland Park
EXHIBIT C - PAYMENT TERMS - PAGE 8 OF 13
A.13.a
Packet Pg. 717
Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO EXHIBIT C – PAYMENT TERMS - Page 9 of 13

7. PREVAILING WAGE DETERMINATION
Based on information available at time of RFP issuance. See tables on following pages.

A.13.a
Packet Pg. 718 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO AWARD AN INDEPENDENT

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 Craft: Landscape Maintenance Laborer
(Applies Only to Routine Landscape Maintenance Work, Not New Landscape Construction) a Determination:

SC-LML-2023-1
Issue Date:

February 22, 2023
Expiration date of determination:

March 31, 2023* Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Office of the Director – Research Unit (415) 703-4774 for the new rates after 10 days from the expiration date, if no subsequent determination is issued.

Wages and Employer Payments:

Locality
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation Holiday Training Hours Total
Hourly
Rate
Overtime
Hourly
Rate
(1 ½ X)
Imperial $15.50 $0.00 $0.00 $0.115b $0.17 $0.00 8.0 $15.785c $23.535c Inyo, Mono and San Bernardino (routine w $15.50 $0.00 $0.00 $0.30 $0.17 $0.00 8.0 $15.97 $23.72 Kern (routine work) $15.50 $0.00 $0.00 $0.16d $0.17 $0.00 8.0 $15.83c $23.58c Colusa and Sutter (complex work) $15.50 $0.00 $0.00 $0.27e $0.46 $0.00 8.0 $16.23c $23.98c Los Angeles $15.50 $0.89 $0.00 $0.115f $0.14 $0.00 8.0 $16.645c $24.395c Orange $15.50 $0.00 $0.00 $0.11g $0.11 $0.00 8.0 $15.72c $23.47c Riverside $15.50 $0.00 $0.00 $0.20h $0.16 $0.00 8.0 $15.86c $23.61c San Diego $15.50 $0.00 $0.00 $0.22 $0.115 $0.00 8.0 $15.835 $23.585 Lake and Mendocino (complex work) $15.50 $0.00 $0.00 $0.24 $0.12 $0.00 8.0 $15.86 $23.61 San Luis Obispo (routine work) $15.50 $0.00 $0.00 $0.15i $0.15 $0.00 8.0 $15.80 $23.55 (complex work) $15.50 $0.00 $0.00 $0.16j $0.16 $0.00 8.0 $15.82 $23.57 Santa Barbara (routine work) $15.50 $0.00 $0.00 $0.12k $0.12 $0.00 8.0 $15.74c $23.49c San Mateo (complex work) $15.50 $0.00 $0.00 $0.13l $0.13 $0.00 8.0 $15.76c $23.51c Ventura (routine work) $15.50 $0.00 $0.00 $0.115 $0.16 $0.00 8.0 $15.775 $23.525 Santa Cruz (complex work) $15.50 $2.97 $0.00 $0.19m $0.26 $0.00 8.0 $18.92c $26.67c NOTE:

If there are two rates, the first rate is for routine work, the second rate is for complex work.

EXHIBIT C - PAYMENT TERMS - Page 10 of 13
A.13.a
Packet Pg. 719 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: LANDSCAPE/IRRIGATION LABORER/TENDER#
Determination:

SC-102-X-14-2023-1
Issue Date:

February 22, 2023
Expiration date of determination:

July 31, 2023** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Imperial, Inyo, Kern, Los Angeles, Mono, Orange, Riverside, San Bernardino, San Luis Obispo, Santa Barbara and Ventura Counties.

Wages and Employer Payments:

Classification
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holidaya
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rateb
(1 ½ X)
Saturday
Overtime
Hourly
Rateb
(1 ½ X)
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Landscape/Irrigation Laborer $37.42 $8.75 $10.82 $5.02 $0.70 $0.50 8.0 $63.21 $81.92 $81.92 $100.63 Landscape Hydro Seeder $38.52 $8.75 $10.82 $5.02 $0.70 $0.50 8.0 $64.31 $83.57 $83.57 $102.83 Determination:

SC-102-X-14-2023-1A
Issue Date:

February 22, 2023
Expiration date of determination:

July 31, 2023* Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Office of the Director – Research Unit at (415) 703-4774 for new rates after 10 days from the expiration date, if no subsequent determination is issued.

EXHIBIT C - PAYMENT TERMS - Page 11 of 13
A.13.a
Packet Pg. 720 Attachment: Agreement - Merchants Landscape Services Inc [Revision 2] (6267 : RECOMMENDATION TO Determination: SC-102-X-14-2023-1

Page 2 of 2 ends