The Watermaster retains the authority to assign or contract the performance of any task or function necessary to consider or perform any matter within the authority and jurisdiction of the Watermaster to any member of the Watermaster, the TC, or any other independent engineering firm or qualified individual. Such assignment or contract shall be coordinated and administered by the Advisor.
As used herein, the term independent means that the Consultant’s or Advisor’s representation of the Watermaster does not create any actual or potential conflict of interest between the Consultant or Advisor and any other member entity under applicable California statute, regulation, or court decision, or under the common law. Nothing in this definition shall prohibit the Watermaster and affected entity, after appropriate vote, from waiving such conflict in writing.
129 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Institutional Plan
9.6 GENERAL DUTIES
The general duties of the Watermaster in order to implement the Judgment fall into three categories, as follows:
9.6.1 POLICY
The Watermaster is responsible for the administration of the Judgment and for the development of policies necessary to carry out the implementation of the Water Management Plan, and for additions and modifications thereof.
9.6.2 WATER MANAGEMENT PLAN IMPLEMENTATION
The Watermaster shall implement a water management plan; its responsibilities in that regard include the following:
Calculating and making determinations regarding the following: (i) safe yield of the Management Area; (ii) each member’s share of safe yield; (iii) necessary reductions in each member’s Base Production Right to ensure production ultimately equals safe yield; (iv) unused storage capacity which may be used for put and take operations of recycled or imported water; and (v) whether replenishment of exported water is accomplished with an appropriate amount of similar or better quality water.
Approving projects to be undertaken by the Watermaster in collaboration with member entities as proposed by members of the Watermaster or by the Advisor. Providing for the recharge of the Management Area. This includes:
(i) implementing a replenishment program for the Management Area; (ii) acquisition of supplemental water supplies (imported, recycled, and Soboba Tribe water); and (iii) providing for the construction and operation of all necessary facilities (including surface and sub-surface percolation and injection facilities).
Determining the amount of, and levying, billing, and collecting the administrative and replenishment assessments.
Budgeting and appropriating funds collected by or on behalf of the Watermaster and paying, or authorizing the payment of, costs and expenses of the Watermaster consistent with the Judgment and Water Management Plan. Initiating and performing such planning and study activities as may be necessary to implement the Judgment and Water Management Plan, including, but not limited to, preparation of a Watermaster’s Annual Report. 130 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Institutional Plan
Initiating necessary conservation and drought management measures, and developing water conservation agreements with the Private Water Producers and/or Soboba Tribe for local conservation measures.
Identifying and participating in the in-lieu replenishment projects. Performing all other tasks and taking all other actions as may be necessary to carry out the purpose and intent of the Judgment and the Plan.
9.6.3 TECHNICAL OVERSIGHT
9.6.3.1 Technical Committee Composition
The Stipulated Judgment provides for the operation of a TC, consisting of representatives named in a written designation by EMWD, LHMWD, the Cities of Hemet and San Jacinto, and the Private Water Producers (as one entity). The representative(s) of an entity may be changed by that entity by written notice of the change to the Watermaster.
9.6.3.2 Technical Committee Purpose
The TC will provide such technical assistance as the Watermaster may request and should make recommendations to the Advisor and to the Watermaster on all matters requiring four votes for Watermaster action as outlined in the Voting section above, and on such other matters as requested by the Watermaster. The TC members shall also keep their respective City Councils and Boards of Directors of the Public Agency parties and the Private Water Producers fully informed about the implementation of the Plan.
9.6.3.3 Technical Committee Chairperson
The Advisor will act as the TC’s Chairperson and fulfill all the necessary administrative functions required on behalf of the TC.
9.6.3.4 Technical Committee Costs
Costs incurred by individual TC members are the responsibility of the entity appointing that member, and Watermaster funds cannot be used to cover the costs and expenses incurred as a result of the TC activities and functions.
131 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Institutional Plan
9.7 WATERMASTER INTERACTION WITH EMWD
9.7.1 CONTRACT FOR SERVICES
The Watermaster will contract with EMWD to provide the following services:
Collection and maintenance of all production, water level, water quality, and other technical data necessary under or required by the Water Management Plan and the transmittal of such data to the Watermaster, its Advisor, and the TC as directed by the Watermaster; the foregoing shall not restrict the Watermaster from entering into other agreements with other members of the Watermaster and/or private firms and individuals for the collection of data. Obtaining imported water from MWD or other sources as requested by the Watermaster for replenishment or direct delivery; the foregoing shall not restrict the Watermaster’s ability to enter into other agreements with other members of the Watermaster and/or private firms and individuals for the purchase and delivery of imported and/or supplemental water.
Construct and operate the Phase I facilities (existing EMWD facilities, expansions thereof, and newly constructed facilities) in a manner consistent with the Water Management Plan.
Perform the accounting functions necessary under the Judgment, i.e., the levy, billing, and collection of all assessments provided for under the Judgment; the payment of costs and expenses of the Watermaster; and related and required accounting and related functions. All funds collected shall be held in a segregated account. All expenses and disbursements shall be separately accounted for. The foregoing shall not restrict the Watermaster from entering into other agreements with other members of the Watermaster and/or private firms and individuals to perform some or all of the accounting functions.
9.7.2 FINANCIAL RESPONSIBILITIES
EMWD will establish restricted accounts and hold all funds collected on behalf of the Watermaster separate from other EMWD funds. All expenditures, encumbrances, and use of funds from these accounts are subject to Watermaster authorization and will be limited to activities related to the Plan. EMWD will transmit periodic reports regarding its financial activities to the Advisor, including annual reporting summarizing the preceding fiscal year financial activities for the approval of the Advisor and the Watermaster. 132 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
SECTION 10 FINANCIAL PLAN
10.1 ANNUAL BUDGET
The Advisor shall prepare an Annual Budget for review, approval, and adoption by the Watermaster. This Budget shall identify each Public Agency member’s financial obligations and assessments and a description of budgeted expenditures, including:
Replenishment water purchase;
Operation and maintenance;
Data collection and evaluation;
Plan implementation administration;
Project planning and reporting;
Billing and assessment collection;
Capital facilities financial obligations; and
Preparation of an Annual Audit.
10.2 OWNERSHIP OF FACILITIES
Each Public Agency will continue to own its existing capital facilities for water management.
However, in some situations, it may be necessary and/or convenient to form a JPA to finance and build specific capital facilities. Responsibility for the cost of any existing and future capital facilities of the Management Plan should be apportioned among the Public Agencies based on relative benefit to be derived by each Public Agency.
10.2.1 EXISTING FACILITIES
The existing groundwater recharge facilities in the Management Area are owned by EMWD.
The Phase I project which is an upgrade of the existing recharge facilities is defined in Section 3.2.2 of this document, and EMWD will own these upgraded facilities. However, the use of the upgraded facilities and the benefits of the low-cost MWD water deliveries through this system will be shared by all agencies based on the level of construction funding contributions for the Phase I facilities and level of participation in the Soboba Settlement financing.
133 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Financial Plan
10.2.2 FUTURE PROJECTS
Any of the participating Public Agencies may propose water supply projects to the Watermaster for inclusion in the Plan. Such proposals, after evaluation by the Advisor and the TC, shall be presented to the Watermaster for approval or rejection. If the Watermaster chooses to reject the proposal, the proposing Public Agency may implement the rejected project as long as it does not significantly impact the implementation of the Plan and/or interfere with ongoing groundwater production by the Public Agencies.
10.2.3 USE OF MEMBER AGENCY ASSETS
It is the intent of the Member Agencies that their respective facilities shall be used in a manner that facilitates the implementation of the Plan, on terms that are equitable to all parties and consistent with each agency’s obligations to its customer base.
10.3 ASSESSMENTS
Public agencies participating in the Plan are subject to two different assessments:
Administrative Assessment; and
Replenishment Assessment.
The purpose and use of these assessment funds are described in the following two sections:
10.3.1 ADMINISTRATIVE ASSESSMENTS
Administrative Assessments will be levied on each acre-foot pumped by each Public Agency up to the agency’s Adjusted Production Right. These assessments can be used to pay costs associated with:
Advisor’s activities and his/her administrative expenses; Billing and assessment collection costs;
Data collection and evaluation projects;
Plan implementation administration, including monitoring plan, and associated salaries and overhead; and
Project planning and reporting expenses.
Initially, the Administrative Assessment shall be Fifty Dollars ($50.00) per AF, subject to adjustment by the Watermaster.
134 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Financial Plan
At the discretion of the Watermaster, any excess funds not used for the above expenditures at the end of the fiscal year can be used to purchase, deliver, and recharge the groundwater within the Management Area. These recharge waters are above and beyond groundwater replenishment waters purchased using the replenishment assessments, and should not be credited to individual Public Agencies as part of their required replenishment obligations. This shall not prohibit the development of a program or plan to provide credits for water purchased above and beyond that needed to satisfy a party’s replenishment obligation.
Subject to the Watermaster’s approval, funds may also be used to acquire and deliver water for direct use in lieu of pumping.
10.3.2 REPLENISHMENT ASSESSMENTS
Replenishment Assessments will be levied on each acre-foot of water pumped in excess of each Public Agency's or Class B Participant’s Adjusted Production Right. Replenishment Assessments will be in amounts equal to the cost of importing or acquiring supplemental water to recharge the Management Area. The component costs will include the cost of the water (including conveyance, transportation and energy costs, operations and maintenance costs, a reserve for replacement and other administrative costs). These assessments will be levied on a per AF of water in excess of each respective member’s adjusted Base Production Right. The revenue received for the replacement component shall be placed in a separate reserve fund to be used to fund the replacement cost of the existing system. New and/or expanded facilities will be financed from other resources.
10.3.3 COLLECTIONS AND ACCOUNTS
All the collected assessments and accounts associated with the Plan will be administered by the EMWD and are subject to the policies set by the Watermaster. All payments made to the Watermaster shall be maintained in a separate restricted account established by EMWD, and all accounts shall be subject to annual independent financial audits.
All revenues and assessments shall be used exclusively to acquire supplemental water for the recharge of the management Area and for the facilities and operational and administrative expenses associated with the Plan.
135 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Financial Plan
10.4 PHASE I FACILITIES CONSTRUCTION AND SOBOBA
SETTLEMENT FINANCING
10.4.1 EMWD CONSTRUCTION COST
The initial facilities, Phase I, shall consist of existing EMWD facilities and expansion and additions to be constructed by EMWD at a cost currently estimated at $16.12 million less public grants totaling $5.0 million, for a net cost of $11.12 million. EMWD shall finance the construction of these facilities through a bond issue or cash payment or by combination thereof.
Each Public Agency shall be responsible for pro-rata repayment of the bonds through EMWD or reimbursement to EMWD (to the extent EMWD pays cash for said construction) based on that Agency's Base Production Right allocation percentage, i.e., 34.2% for LHMWD, 33.7% for EMWD, 19.6% for the City of Hemet, and 12.5% for the City of San Jacinto.
10.4.2 PAYMENTS TO SOBOBA TRIBE
In addition to the financing of the construction of Phase I facilities referred to in Section 10.4.1 above, the Soboba Settlement requires the payment of an additional $17 million to the Soboba Tribe in return for the right to use low cost MWD water delivered for the benefit of the Tribe but which the Tribe does not use and other unused Tribal water. The $17 million will be financed in the same manner as the construction of the initial Phase I facilities, i.e., by bond issue or cash payment by EMWD or a combination thereof. The $17 million obligation will be partially offset by a $10 million contribution by the United States toward the costs of constructing the Phase I facilities. Each Public Agency shall be responsible for pro-rata repayment of the bonds through EMWD or reimbursement to EMWD (for cash payment) based on that Agency's Base Production Right allocation percentage, as set out in Subparagraph (a) above.
10.4.2.1 Water Cost
The payment described above to the Soboba Tribe for the right to use low-cost MWD water delivered for the benefit of the Tribe but not used by the Tribe does not include the price of the water itself, which must be paid to MWD. Each Public Agency shall contractually agree with EMWD to pay its share of MWD’s price for such water that it acquires for use to EMWD to enable EMWD to pay MWD.
136 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Financial Plan
10.4.3 EMWD OBLIGATION
Agreements between EMWD and each other Public Agency setting forth that Agency's financial commitment as required under Sections 10.4.1 and 10.4.2 (citation) above will be required as a condition precedent to EMWD's obligation to finance the facilities construction and the payment to the Tribe so as to establish a dedicated source of revenue for bond repayment or reimbursement, as appropriate. Said agreements shall also provide that, in return for said financial commitment, the Public Agency shall be entitled to: (1) share in the capacity of the Phase I facilities (those in existence and those to be constructed) and (2) share in the rights to the MWD water not used by the Tribe and other unused Tribal water, in each case based on the Agency's Base Production Right allocation percentage, as set out in Subparagraph (a) above.
Each agreement with EMWD shall provide for the Agency’s method of pro-rata repayment of bonds or reimbursement to EMWD, provided, however, that no Agency will be required to do so by cash payment without its consent.
10.4.4 RIGHT TO TRANSFER ENTITLEMENT TO USE FACILITIES AND/OR ENTITLEMENT TO
SHARE IN RIGHTS TO WATER NOT USED BY TRIBE
Each Public Agency shall have the right to sell, lease or otherwise transfer the rights and obligations it holds to use the Phase I facilities described in Section 10.4.1 above and/or to share in the rights to the MWD water not used by the Tribe or other water not used by the Tribe described in Sections 10.4.2 and 10.4.3 above, provided that the transferee thereof shall be bound by said obligations. The foregoing notwithstanding, the Watermaster shall have the right of first refusal regarding any such transfer proposed by a Public Agency.
10.5 FUTURE CAPITAL FACILITIES
Future facilities may be required to meet the growth needs of the Management Area, which may require that a JPA or other financing conduit be formed. In either case, each Public Agency’s contribution toward the cost of acquiring the added facilities shall be established by the Watermaster at the time such facilities will be needed. The use of such facilities shall be at the discretion of the Watermaster and be dedicated to replenishment activities. The foregoing shall not affect the right of a Public Agency to undertake a water supply project pursuant to Section 10.4.2 above.
137 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Financial Plan
(This Page Left Blank Intentionally)
138 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
SECTION 11 IMPLEMENTATION PLAN
The five-member Watermaster Governing Board (Watermaster) will be composed of one elected official each from the City of Hemet, City of San Jacinto, LHMWD, and EMWD (Public Agencies) and one representative elected by the private groundwater producers (Private Water Producers). Each member of the Watermaster will have one vote and will serve until replaced by the entity (Public Agencies or the Private Water Producers) making the original appointment.
The Watermaster is responsible for administering and enforcing the provisions of the Stipulated Judgment and any subsequent instructions or orders of the Court. The implementation of the Management Plan, along with any additions or modifications as may from time to time be appropriate, and all financial matters relating to Management Plan Activities are the responsibility of the Watermaster.
This section describes how the Watermaster is expected to implement different elements of the Physical Solution outlined in the Stipulated Judgment. Information provided in this section should be used for planning purposes and is not intended to set or change any conditions imposed by the Stipulated Judgment. The timelines provided in this section should be used as guidelines and are not meant to imply any obligation to be met by the Watermaster. The Watermaster is expected to use the information provided in this section during the early years after its formation and refine, revise, or redefine the information, as it deems appropriate.
11.1 ORGANIZATION
The Watermaster will receive assistance and support from legal counsel, an Advisor, a Technical Committee (TC), and Eastern Municipal Water District (EMWD). The duties and responsibilities of each entity are outlined in subsequent sections. Figure 11.1 demonstrates the relationships between the Watermaster and its supporting entities.
Within one month of the Stipulated Judgment approval, the Private Pumpers identified as Class A and B participants are expected to develop a procedure for electing their representative. The elected officials from the Agencies and the Private Pumpers serving as the Watermaster should be identified within the first two months of Stipulated Judgment approval, and the Watermaster should conduct its first meeting at a mutually acceptable location within one month after that. 139 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Implementation Plan
EMWD
TECHNICAL
ADVISORY
COMMITEE
ADVISOR
WATERMASTER BOARD LEGAL
COUNSEL
Management
Evaluation
Recmmendations
Purchase water from MWD
Deliver water to recharge basins
Operation and maintain facilities and systems
Other activities related to physical operations
Data / sample collection
Lab analysis and data compilation
Meter reading / billing / collection / accounting
RECHARGE OPERATIONS ADMINISTRATION AND MONITORING
Figure 11.1 Relationships between Entities
Within three months of the Watermaster’s first meeting, the Watermaster will retain the services of an independent attorney or legal firm (Legal Counsel) to provide assistance with legal matters and to provide ongoing advice and recommendations in legal areas appropriate to the Watermaster carrying out its duties
Also within three months of the Watermaster’s first meeting, the Watermaster will contract with either an independent engineering firm or a qualified individual (Advisor) experienced in hydrology to evaluate and analyze the data collected by EMWD and any conclusions based on that data, and to make recommendations to the Watermaster. The Advisor will provide general coordination between the Watermaster, the Technical Committee, and EMWD with respect to their respective functions, and will also perform such executive functions as the Watermaster may direct. The Watermaster may refer any matter it chooses to any person it may select for assistance in carrying out its duties under the Judgment.
The TC will consist of managerial and technical representatives of the Agencies and Private Water Producers. The Advisor will serve as the TC chairman. The TC will provide technical assistance at the request of the Watermaster. The TC will make recommendations to the Advisor and to the Watermaster on all matters requiring four votes for Watermaster action, which are:
140 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Implementation Plan
Any change in the form of governance;
Any change in voting requirements;
Retaining the services of legal counsel and Advisor;
Establishing, levying, increasing or decreasing all assessment amounts; Adopting or amending the annual budget;
Determining the extent of overdraft and quantifying safe yield; Determining Adjusted Production Rights;
Decisions regarding the financing of Supplemental Water or facilities; Decisions regarding ownership of facilities, other than ownership of the Phase I facilities, which will be owned by EMWD, subject to a right of use by those parties participating in the Phase I financing;
Management policies for the Management Area; and
Any decision that involves a substantial commitment by the Watermaster, including any contracts for conserved water.
In addition, the TC will receive all Monitoring Program and associated data from EMWD for review and evaluation. The TC members are anticipated to keep the City Councils, Agency Boards of Directors, and participating Private Pumpers informed about the Watermaster activities and the Water Management Plan’s status.
Within six months of Stipulated Judgment approval, the Watermaster will prepare and adopt Rules and Regulations for its own operation as well as for the operation of the Water Management Plan and Judgment. A dispute resolution process will be included in the Rules and Regulations.
11.2 MONITORING PROGRAM IMPLEMENTATION
The Monitoring Program was initiated with the execution of the September 2003 Agreement to Develop a Groundwater Monitoring Program in the Hemet/San Jacinto Management Area between the Cities of Hemet and San Jacinto, EMWD, and LHMWD. Its purpose was to measure and monitor groundwater levels to assist in the accurate evaluation of conditions of overdraft and the evaluation of the operational safe yield in the Management Area. In addition to water levels, the program included water quality and production monitoring. The agreement for 2005 added surface water monitoring of San Jacinto River flows in conjunction with the U.S.
Geological Survey. Funded equitably among the agencies, the Monitoring Program has been managed by EMWD. The monitoring locations currently are sampled annually for quality and are measured semi-annual for water levels. The locations are presented in Figure 11.2. These 141 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Implementation Plan
locations may be updated based on the recommendations in the annual monitoring program as discussed later in this Section.
To protect groundwater supplies, an Inactive Well Capping/Sealing Program is included in the Monitoring Programs. Under this program, an inactive well or open casing will be capped/sealed at no charge to the well owner. These wells may still be used for water level and, in some cases, water quality monitoring. Priority is given to those wells that are potentially dangerous open holes (16-18" casings) or those located in areas where flooding resulting from precipitation might carry manure, fertilizers, or other contaminants into the well.
Any Agency or well owner can provide the Watermaster or Monitoring Program personnel with the location of an unused well or open casing for consideration for the Inactive Well Capping/Sealing Program.
Under a contract with the Watermaster, EMWD will lead the Monitoring Program effort. Prior to January 1st of any given year, EMWD staff will present a proposed Monitoring Program to the Advisor. The program is anticipated to include:
1. Estimated number of wells to be monitored for groundwater levels;
2. Estimated number of wells to be sampled for water quality;
3. Number of meters to be read monthly or installed or repaired;
4. Estimated number of inactive wells to be capped;
5. Any changes or variation from the previous year’s activities; and
6. Estimated budget to include cost for the field activities and development of the annual report.
The Advisor will review, revise, approve or reject the proposed monitoring program and initiate the annual monitoring program before the end of January of each year. The annual Monitoring Program budget must be approved by the Watermaster before the end of February of each year. The Monitoring Program is run on a calendar year basis and each annual report and associated budget will reflect such a calendar year time period. 142 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
!
!
$ $ $
$$
$
$
$
$
$
$
$
$
$
$
$ $
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$$ $
$
$
$
$
$
$
$
$
$
$
$
$
$ $ $
$
$
$
$
$ $
$
$
$
$
$$$
$
$$
$
$
$ $$
$
$
$
$
$
$
$
$
$
$
$
$
$ $ $
$
$
$
$
$
$
$ $
$$
$
$
$
$$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$$
$$
$
$
$
$
$
$
$
$
$ $
$
$
$
$
$
$$$
$
$
$
$ $
$
$ $
$
$ $
$
$
$
$
$
$ $
$
$
$
$
$
$
$ $
$$
$$
$
$
$$
$
$
$
$
$
$
$
$
$
$
$$
%
%
%
San Jacinto River
Diamond Valley Lake
Lake Skinner
Hemet
San Jacinto
·|}þ79
·243 |}þ
·|}þ74
·|}þ79
SWG_11070020
SWG_11070150
SWG_11069500
Legend
% Stream Gages*
Groundwater Monitoring Sites Type*
$ Water Quality Only
$ Water Level Only
$ Quality and Level
! Cities
Major Watercourses
Lakes and Reservoirs
Major Roads
Management Area
October 2007
Hemet / San Jacinto Water Management Plan
Stream Gages and Groundwater Monitoring Sites
Figure 11.2
0 1 0.5
Miles
±
*Source: EMWD
Implementation Plan
Data to be considered for collection and inclusion in the Hemet/San Jacinto Water Management Area Annual Reports to assess the status of the basins and to monitor the responses for future management activities may include, but is not limited to:
Groundwater level monitoring results;
Groundwater quality monitoring results;
Groundwater production;
Surface water flow monitoring results;
Surface water quality;
Surface water diversions;
Imported water;
Hydrologic data (rainfall and evaporation);
Recycled water production;
Recycled water sales/use;
Conveyance water;
Water conservation measures;
Population growth and development; and
Land use and crop mix.
EMWD will submit the Annual Hemet/San Jacinto Water Management Area Report resulting from the Monitoring Program to the Advisor for review within four months after completion of each calendar year’s monitoring program. The Advisor will then provide the Watermaster with recommendations on how best to operate the Management Area as well as provide a proposed determination of Administrative and Replenishment Assessments for each agency based on previous year’s activities. Within the first six years, the Watermaster, with input from its Advisor and the TC, will make a determination of the safe yield of the Management Area.
Thereafter, the safe yield shall be reviewed and modified, if necessary, upon the recommendation of the TC or as the Watermaster may determine.
The Watermaster will use information provided in the Annual Hemet/San Jacinto Water Management Area Report and Advisor’s recommendations to decide on how to meet the goals for the upcoming year(s).
11.3 MANAGEMENT PLANNING TOOLS
In the future, the Watermaster may want to develop or use databases and other numerical models as planning tools. EMWD maintains a RWRD. Data from the Groundwater and Surface 144 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Implementation Plan
Water Monitoring Programs, as well as other water and groundwater-related data, are stored in this database. These data form the basis of the Hemet/San Jacinto Water Management Area Annual Reports and can be made available to the Advisor.
EMWD’s groundwater flow/transport numerical model can also be made available to assist the Advisor and the Watermaster in evaluating different water resources management alternatives for future projects, for planning purposes, for analysis as in the Regional Water Quality Control Board permitting process, and for determining safe yield. The model is capable of calculating the water budget, exhibiting trends, evaluating regulatory constraints, and can be used as a planning tool. It is recommended that the model be updated every three to five years at the discretion of the Watermaster.
To use EMWD’s RWRD and groundwater flow/transport numerical model, the Watermaster is anticipated to enter into a contract with EMWD to cover the Watermaster related cost of software upgrades, necessary hardware, and resources required for maintenance of these tools.
11.4 FINANCIAL ADMINISTRATION
The Watermaster is responsible for the levying, billing, and collection of all assessments provided for under the Judgment, for the payment of all costs and expenses of the Watermaster, and for the performance of accounting and related functions required in connection with performing the Watermaster’s duties. The Agencies’ groundwater production will be subject to Administrative and Replenishment Assessments. Class B participants are only subject to Replenishment Assessments.
The Watermaster will determine the amount of the Administrative Assessments. For the first year of implementation these assessments are set at $50 per acre-foot. The amount of the Replenishment Assessments will equal the cost of providing a like quantity of supplemental water to recharge the Management Area. The cost of providing a like quantity of water will include the costs of water, operations and maintenance costs of the replenishment system; capital recovery, and other administrative costs as defined in the Stipulated Judgment. An Administrative Assessment will be levied on each acre foot pumped by an Agency up to its adjusted base production right excluding any adjustments as outlined in the Stipulated Judgment.
In order to obtain operating funds for the Watermaster, the Agencies will advance payment of their share of the Administrative Assessments. These payments are anticipated to be paid within the first quarter of each year. Replenishment Assessments due will be determined on the basis of production during the prior calendar year, and are expected to be paid within the first 145 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Implementation Plan
quarter of the year following the prior calendar year’s production. Replenishment Assessments will be collected prior to actual recharge by the Watermaster.
In addition, the Agencies will be required to make payments as required under other obligations with EMWD, such as, Phase 1 Facilities and Construction Cost and Use, and delivery and use of recycled water agreements.
Starting with the second year, the Watermaster’s invoices should reflect the balance of the Administrative and Replenishment Assessment payments from the previous year as a credit or debit on the invoices.
Within three months of Stipulated Judgment approval, the Watermaster is anticipated to contract with EMWD to perform the Watermaster’s accounting functions including billing, collection, and accounting. EMWD will maintain a restricted account for such activities as the operation of the Monitoring Programs and purchase of replenishment water. In addition, EMWD will invoice the Watermaster for its share of imported water costs. EMWD’s restricted accounts will be included in the Watermaster’s year-end audits to be conducted in accordance with accepted accounting principles.
Funding for the monitoring program, development and use of the management planning tools, and the financial management of the accounts are anticipated to come from Administrative Assessments.
All funds collected by EMWD must be held in a segregated account and all expenses and disbursements must be separately accounted for.
11.5 STIPULATED JUDGMENT ADMINISTRATION
The Watermaster shall prepare, file with the Court, and distribute to relevant parties a Watermaster Annual Report including a summary of all activities during the preceding calendar year, an audited statement of all accounts and financial activities of the Watermaster, and a summary of extractions and replenishments as well as all other pertinent information.
The Watermaster will provide the Court updated estimates of the groundwater budget, safe yield, and overdraft as required.
During the development of the Water Management Plan, a number of Agreements and MOUs were initiated among and between the Agencies. Within three months of the Stipulated Judgment approval, the Watermaster will review and re-issue the Agreements and MOUs in the name of the Watermaster if necessary and appropriate. The current MOUs are presented in Appendix H.
146 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Implementation Plan
Upon Settlement Agreement implementation, the Watermaster will recognize the Tribal Water Rights, as set forth in the Stipulated Judgment and the applicable provisions of the Soboba Tribe Settlement Agreement.
11.6 FACILITIES AND PROJECTS
Each Agency shall continue to own its existing capital facilities for water management.
However, capital facilities may be jointly constructed and owned by the Management Plan.
Joint financing of such facilities may be funded by regional capital fees, loans and grants, municipal bonds, and contributions for storage by The Metropolitan Water District of Southern California or other third parties. Responsibility for the costs of any existing and future capital facility of the Management Plan should be apportioned among the Agencies based on the relative benefit to be derived by each Agency. Any Agency may propose a project to be included in the Management Plan to increase Management Area water supply. Such proposals, after evaluation by the Watermaster, shall be included or rejected. If the Watermaster chooses to reject a proposal, the proposing Agency may implement the rejected project as long as it does not significantly impact the implementation of the Management Plan and/or interfere with the ongoing production by the Agencies. The maintenance and upgrading of facilities currently owned by any Agency, and used to further the goals of the Management Plan, will be considered by the Watermaster for funding.
The Agencies have been evaluating and developing a number of programs to mitigate overdraft. The stakeholders agreed that the primary project, the core of the Physical Solution, is the IRRP. This project involves the artificial recharge of imported water into the basin along the San Jacinto River. An agreement that documents the ownership, financing, and operation of the facilities for Phase I of the IRRP is anticipated to be executed after completion of the California Environmental Quality Act (CEQA) process.
The Recycled Water In-Lieu Program identifies large agricultural pumpers in the Management Area that can use recycled water as their source of supply instead of producing groundwater.
Providing recycled water to these producers will reduce the stress on groundwater resources and will reduce the community’s long-term need for imported replenishment water.
The Watermaster, with assistance from the Advisor, TC, and EMWD, will develop recycled water strategies. The operational feasibility of these strategies will be assessed and determined by the Advisor and EMWD. The Advisor will recommend economically feasible projects to the Watermaster for implementation. It is anticipated that EMWD, as the sole recycled water provider in the Management Area will, own, operate and administer facilities required for these projects.
147 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Implementation Plan
11.7 SPECIAL PROJECTS AND STUDIES
It will be necessary to conduct technical or other investigations such as hydrogeologic investigations, GIS analyses, field investigations, numerical modeling, or feasibility studies.
The Watermaster may act individually or participate with other entities to conduct such investigations or to collect data necessary to accomplish the main goals of the Management Plan. In addition, any Agency may propose investigations or studies that are appropriate to the goals of the Management Plan. Such proposals, after review by the Advisor and evaluation by the Watermaster, shall either be accepted or rejected. If the Watermaster rejects a study, the proposing Agency may still implement the investigation or study so long as it does not significantly impact the implementation of the Management Plan or interfere with the ongoing activities by the Agencies.
11.8 CONSERVATION PROGRAMS
Each agency maintains its own individual Conservation Program. Additional conservation measures can be designed and implemented using Best Management Practices by the agencies and/or implemented by the agricultural producers and dairy water users. The Watermaster has the discretion to expand its involvement in local conservation programs and if appropriate, lead any collaborative conservation program amongst the agencies.
11.9 WELL CONSTRUCTION, ABANDONMENT, AND DESTRUCTION
Riverside County regulates the construction, reconstruction, abandonment, and destruction of community water supply wells, individual domestic wells, and agricultural wells. Through the offices of the Department of Environmental Health, the County is responsible for issuing permits for well drilling or abandonment.
Section 10 of the Ordinance No. 682.3 states, “Standards for the construction, reconstruction, abandonment, or destruction of wells shall be the standards recommended in the Bulletins of the California Department of Water Resources as follows: Bulletin NO 74-81 Chapter II Water Wells, and Bulletin NO 74-90 (Supplement to Bulletin 74-81) and as these Bulletins may be amended by the State of California from time to time.”
To oversee management of the groundwater resources in the area, the Watermaster is expected to coordinate with the County of Riverside, and track new developments in the area. This will help the Watermaster to identify critical groundwater monitoring wells that are located in areas to be developed. A plan for proper abandonment and/or destruction, and replacement of the well as a monitoring well, if appropriate, will then be set in motion. 148 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Implementation Plan
If the well is critical in providing data for the Management Area Monitoring Program, the Watermaster will work with the appropriate jurisdictional agency and the well owner to save the well for monitoring or to replace it with a new monitoring well in an area adjacent to a retention basin, park, green belt, or other community area in the vicinity of the original well location.
The Advisor, with the concurrence of the Watermaster, will arrange meetings with the Agencies to discuss and review future construction of any facilities that may be of value or interest to the Management Plan area. The Watermaster will work with the project proponent with regard to enhancing and or modifying the facilities to maximize the benefit to the Management Plan effort.
11.10 PUBLIC PARTICIPATION
The process by which interested and affected individuals, organizations, agencies and government entities are consulted and included in decision making, has been the driving force in the development of the Water Management Plan. Stakeholders in the Hemet/San Jacinto basins have recognized for several years that their groundwater basins are in a state of overdraft. The Soboba Water rights Proposal presented in February of 1995 provided the impetus for the examination of the overdraft problem. The topic of discussion of a public meeting held on December 13, 2000 was the state of the Hemet/San Jacinto groundwater basins.
EMWD sponsored community discussions in early 2001 entitled: “Groundwater Management:
Avoiding Political Pitfalls”, “State of the Hemet/San Jacinto Basins”, and “Cooperate to Selfgovern”. The Principles for Water Management were drafted as the basis for a starting point to develop solutions, both for the Soboba proposal and for the overdrafted basin. The Principles were circulated to the general public in February 2001.
In June, 2001, EMWD, LHMWD, City of Hemet and City of San Jacinto signed a conjunctive management Memorandum of Understanding (MOU) with DWR. Two committees were organized to work cooperatively to address the issues. The policy committee, comprised of elected officials and staff members of the four agencies, plus local private pumpers, and a technical advisory committee with representatives from the four agencies, the private pumpers and a neutral consultant provide by DWR. The policy committee meetings are open to the public and are frequently attended by agricultural pumpers, local business owners, local residents, and tribal members, attorneys and technical consultants of the Soboba Band of Luiseño Indians.
Water Outreach Public Information Programs hosted by EMWD have been held at a local restaurant in Hemet in October 2001 and August 2002 to discuss the progress of the Groundwater and Technical Committees in the development of a Water Management Plan. 149 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Implementation Plan
150 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
The Watermaster will continue this process of public involvement and community outreach during Management Plan implementation. Meetings of the Watermaster will be public meetings and will, therefore, be subject to the Brown Act.
11.11 GROUNDWATER MANAGEMENT PLAN COMPONENTS AND
CONSISTENCY WITH THE CALIFORNIA WATER CODE
Groundwater management is the planned and coordinated local effort of sustaining the groundwater basin to meet future water supply needs. With the passage of AB 3030 in 1992, local water agencies were provided a systematic way of formulating groundwater management plans (California Water Code, Sections 10750 et seq.). AB 3030 also encourages coordination between local entities through joint-power authorities or MOUs. SB 1938, passed in 2002, further emphasized the need for groundwater management in California. SB 1938 requires AB 3030 groundwater management plans to contain specific plan components to receive state funding for water projects.
The Water Management Plan includes the seven mandatory components that are required to be eligible for the award of certain funds administered by DWR for the construction of groundwater projects or groundwater quality projects. The Plan also addresses the 12 specific technical issues identified in the California Water Code along with the seven recommended components identified in DWR Bulletin 118 (DWR 2003). Appendix I lists the required and recommended components and identifies the specific location within this Plan where the information can be found.
11.12 SCHEDULE
The Plan Implementation Schedule is shown in Table 11.1.
Phase I of the Integrated Recharge and Recovery Program is scheduled to be constructed in two phases, Phase A and Phase B. The schedule for activities related to these phases is shown in Table 11.2.
Implementation Plan
Table 11.1 Plan Implementation Schedule
Task
No. Description Time Required
Estimated
Completion
1 Retain Services of Legal Counsel 3 Mos.
2 Retain Services of Advisor 3 Mos.
3 Review and Re-issue Existing Agreements and MOUs
in the Name of the Watermaster if Appropriate and/or
Necessary
3 Mos.
4. Watermaster Enter into Contract(s) with EMWD to:
a) Manage/administer the Groundwater and Surface
Water Monitoring Programs and prepare the
Hemet/San Jacinto Water Management Plan Annual
Report containing Monitoring Program results and
related information;
b) Compile all data and maintain the Regional Water
Resources Database;
c) Operate, maintain, and update the Groundwater
Model.
d) Provide Accounting Functions.
e) Manage Recharge Facilities and any Other Field
Operations.
3 Mos.
Within 6 mos.
of Stipulated
Judgment
Approval
(S.J.A.)
6 First Watermaster Annual Report to the Court 3 Mos.
Within
14 mos. of
S.J.A.
7 Develop and Adopt Rules and Regulations 3 Mos. Within 6 mos. of S.J.A.
8 Administrative Assessment Payment
1st Quarter
of Each
Year
On-going
9 Replenishment Assessment Payment
1st Quarter
of Each
Year
Following
the Actual
Production
On-going
151 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Implementation Plan
Table 11.2 Phase I Project Construction
Task
No. Description Time Required
Estimated
Completion
PHASE A
1 Environmental Process (EIR) --- Completed
2 Land Acquisition
3 Grant Approval, Advertising, Award 7 Mos.
4 Extraction Well Drilling 17 Mos.
5 Extraction Well Pump & Chlorination Equipping 12 Mos. 6 Pump Station Modifications 12 Mos.
Within 6 mos. of
Settlement
Agreement
Approval
(S.A.A.)
PHASE B
1 NEPA/Permitting Process --- Before S.A.A.
2 Extraction Well Drilling 6 Mos.
3 Extraction Well Pump & Chlorination Equipping 19 Mos. 4 Recharge Basins 5 Mos.
5 Pipelines 5 Mos.
6 Monitoring Wells 6 Mos.
Within 12 mos.
of S.A.A.
152 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
SECTION 12 REFERENCES
Boen, Doyle; Bunts, J.H.; Currie, Robert J. 1971. Study of Reutilization of Wastewater Recycled through Groundwater, Vols.1 & 2, USEPA Office of Research and Monitoring.
DWR. 2006. California Irrigation Management Information System (DWR CIMIS). Online.
Accessed February 17, 2006.
http://wwwcimis.water.ca.gov/cimis/monthlyEToReport.do.
DWR. 2000. Groundwater Basins shapefile. http://casil-mirror1.ceres.ca.gov/casil/ gis.ca.gov/teale/grdwatba/
DWR. 1978. Water Resources Evaluation of the San Jacinto Area. April.
DWR. 1969. Investigation of Ground Water Conditions in the San Jacinto River Valley. July.
EMWD. 2005a. Urban Water Management Plan 2005. December.
EMWD. 2005b. Hemet/San Jacinto Water Management Area 2004 Annual Report. June.
EMWD. 2005c. Regional Water Resources Database.
EMWD. 1996, 1997, 1998, 1999, 2000, 2001, 2002, 2003, 2004, 2005d. West San Jacinto Groundwater Basin Management Plan, Annual Report of the Status of the Groundwater Subbasins. Eastern Municipal Water District. Report produced annually each year for the proceeding year from 1996-2004. Most recent report for 2004 published 2005.
Engineering Resources of Southern California. 2005. Preliminary Design Report for the San Jacinto Agricultural In-Lieu Water Supply Project. January.
Hemet, City of. 2006. Urban Water Management Plan 2005. February.
LHMWD. 2005. Urban Water Management Plan 2005. November.
Lofgren, Ben. 1976. Land Subsidence & Aquifer System Compaction, Journal Research USGS.
Lofgren & Rubin. 1975. Radiocarbon Dates Indicate Rates of Graben Downfaulting, Journal Research USGS.
Metropolitan Water District of Southern California (MWD). 1991. Eastside Reservoir Project Final Environmental Impact Report, October.
Morton, D. M. 1995. Subsidence and Ground Fissuring in the San Jacinto Basin, Southern California.
In K. R. Prince, D. L. Galloway and S. A. Leake (eds.), U.S. Geological Survey Subsidence Interest Group Conference, Edwards Air Force Base, Antelope Valley, California 153 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
References
November 18-19, 1992: Abstracts and Summary: U.S. Geological Survey Open-File Report OF 94-532, p. 29-31.
Psomas. 2003. Hemet-San Jacinto Recharge and Recovery Program- Feasibility Study. June.
Rees, Terry F. 1994. letter sent to LeAnne Hamilton of EMWD. October 31.
San Jacinto, City of. 2005. Urban Water Management Plan 2005. December.
Santa Ana Regional Water Quality Control Board (RWQCB). 1995. Water Quality Control Plan, Santa Ana River Basin (8). Adopted March 11, 1994, and as amended (Resolution No. R8- 2004-001, January 2004).
Singh, Gurinder Jit. 1992. EMWD San Jacinto Water Harvesting Project Feasibility Study. July.
State Water Resources Board (SWRB). 1955. Bulletin No. 15 Santa Ana River Investigation, Appendix B Geology of San Jacinto and Elsinore Basins. June 1955.
TechLink Environmental. 2002a. Regional Groundwater Model for the San Jacinto Watershed.
December.
TechLink. 2002b. Hemet-San Jacinto Integrated Recharge and Recovery Program- Feasibility Study Groundwater Flow Model. December.
TetraTech. 2004. Groundwater Infiltration Predictions Using Surface Water Model Output for the San Jacinto Watershed. March.
TetraTech. 2003. Lake Elsinore and Canyon Lake Nutrient Source Assessment. January.
United States Department of Agriculture, Soil Conservation Service. 1971. Soil Survey: Western Riverside Area California. November.
Wildermuth Environmental, Inc. 2000. TIN/TDS – Phase 2A of the Santa Ana Watershed, Development of Groundwater Management Zones, Estimation of Historic and Current TDS and Nitrogen Concentrations in Groundwater, Final Technical Memorandum. July.
WRIME. 2003a. Basin Assessment Report and Integrated Water Management Plan, TM 1, Assessment of Historical and Projected Land and Water Use Data. June.
WRIME. 2003b. Basin Assessment Study, Executive Summary. May.
WRIME. 2003c. Basin Assessment Report and Integrated Water Management Plan, TM 2, Identification and Description of Potential Conjunctive Use Projects. May.
WRIME. 2003d. Operation Yield Study, Hemet/San Jacinto Groundwater Management Area.
January.
154 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
References
WRIME. 2004. Draft Technical Memorandum No. 3 (TM3) - Analysis of Impacts of Conjunctive Use Projects. January.
155 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
References
(This Page Left Blank Intentionally)
156 Hemet/San Jacinto Groundwater Management Area
Water Management Plan
APPENDIX A SETTLEMENT AGREEMENT
Hemet/San Jacinto Groundwater Management Area
Water Management Plan
SOBOBA BAND OF LUISEÑO INDIANS
SETTLEMENT AGREEMENT
THIS SETTLEMENT AGREEMENT is entered into by the Soboba Band of Luiseño Indians on behalf of itself and its members (collectively, the “Soboba Tribe”); the United States of America solely in its capacity as trustee for the Soboba Tribe (the “United States”); the Eastern Municipal Water District (“EMWD”); the Lake Hemet Municipal Water District (“LHMWD”); and The Metropolitan Water District of Southern California (“MWD”).
ARTICLE 1- RECITALS
1.1 The Soboba Tribe has made claims against EMWD and LHMWD (collectively, the “Local Districts”) for alleged infringement of its water rights in the San Jacinto River (“River”) and the Canyon Sub-basin and the Intake portion of the Upper Pressure Sub-basin associated therewith (collectively “Basin”) in Riverside County, California, and for damages related to historical interference with the Soboba Tribe’s rights and the unauthorized use of its water. Specifically, the Soboba Tribe alleges that the Local Districts, through their longstanding diversion of waters from the River and pumping of Groundwater from the Basin, have interfered with the Soboba Tribe’s water resources and its rights to the beneficial use and enjoyment of the Reservation.
1.2 The Soboba Tribe also has filed a lawsuit against MWD styled Soboba Band of Luiseño Indians v. Metropolitan Water District of Southern California, United States District Court Case No. 00-04208 GAF (MANx) (the “Action”). The Action alleges that MWD, by the construction and operation of the San Jacinto Tunnel (the “Tunnel”), has interfered with the Soboba Tribe’s water resources and its rights to the beneficial use and enjoyment of the Reservation.
1.3 The Parties have agreed to settle the Soboba Tribe’s claims on the terms set forth in this Settlement Agreement.
2 1.4 MWD also contends that it has legal indemnification claims and other rights against EMWD for the Action arising out of MWD Board Resolution 3940 (EMWD’s Terms of Annexation into MWD). In 1951, EMWD was created and annexed into MWD for the purposes of resolving claims that MWD’s construction and operation of the Tunnel interfered with local water rights in the Basin and to obtain a supplemental supply of water for the area. The Terms of Annexation required EMWD to resolve potentially conflicting rights to the Tunnel seepage water and that MWD annually credit EMWD for the entire amount of Tunnel seepage, which MWD has done every year since 1951. In exchange for the benefits of being annexed into the MWD service area and the return of the Tunnel seepage water to EMWD, EMWD was required to defend and indemnify Metropolitan from certain claims seeking recovery for loss or injury as a consequence of the Tunnel seepage, specifically including claims brought by the Tribe. In response to the Tribe’s Action, MWD tendered the defense and indemnity of the Tribe’s claims to EMWD, which EMWD declined on the grounds that the Action allegedly exceeded the scope of its obligations under the Terms of Annexation. MWD subsequently filed a third party action against EMWD seeking to enforce the defense and indemnity provisions contained in the Terms of Annexation. EMWD and MWD dispute each other’s contentions.
1.5 EMWD and MWD have agreed as part of this settlement to resolve their dispute over the scope of EMWD’s defense and indemnity obligations to MWD reflected in the EMWD’s Terms of Annexation.
NOW, THEREFORE, in consideration of the promises and agreements hereinafter set forth, the Parties agree as follows:
ARTICLE 2 - DEFINITIONS
This Settlement Agreement employs abbreviated terms that have the meanings below. To the extent that the definitions below conflict with those terms defined in other sections of the Settlement Agreement, the definitions in Article 2 shall prevail.
2.1 “Act” unless otherwise indicated, shall mean the Soboba Settlement Act approving this Settlement Agreement, attached as Exhibit A. 3 2.2 “Action” means the Soboba Tribe’s lawsuit against MWD styled Soboba Band of Luiseño Indians v. Metropolitan Water District of Southern California, United States District Court Case No. 00-04208 GAF (MANx) and includes MWD’s third party claim against EMWD.
2.3 “AFA” means acre-foot of water per annum.
2.4 “Basin” means collectively the Canyon Sub-basin and the Intake portion of the Upper Pressure Sub-basin as depicted on Exhibit B (map) and described in Exhibit C.
2.5 “Best Efforts” means that the Districts will take all commercially reasonable actions to fulfill the referenced contractual obligation.
2.6 “Canyon Sub-basin” means the groundwater basin as depicted on Exhibit B (map) and described in Exhibit C.
2.7 “Court” shall mean the Federal District Court for the Central District of California, Central Division, which has exercised jurisdiction over the Action.
2.8 “Decree Court” means the court with jurisdiction over the judgment and decree entered in accordance with this Settlement Agreement.
2.9 “Districts” means EMWD, LHMWD, and MWD.
2.10 “Effective Date” means the date on which the Secretary causes to be published in the Federal Register a statement of findings that the conditions in Section
3.1 have been fulfilled.
2.11 “EMWD” means the Eastern Municipal Water District.
2.12 “Groundwater” for the purposes of this Settlement Agreement means all water beneath the surface of the earth.
2.13 “Imported Water” means water sold by MWD to EMWD pursuant to Section 4.4 and is not intended to have the same meaning as the term “Imported Water” is used in MWD’s Administrative Code.
2.14 “Intake Sub-basin” means the portion of the Upper Pressure groundwater Subbasin as depicted on Exhibit B (map) and described in Exhibit C.
2.15 “LHMWD” means the Lake Hemet Municipal Water District. 4 2.16 “Local Districts” means EMWD and LHMWD.
2.17 “MWD” means The Metropolitan Water District of Southern California.
2.18 “Party” is the singular form of “Parties,” which means the entities represented by the signatories to this Settlement Agreement.
2.19 “Recharge Facilities” means those facilities to be constructed by the Local Districts pursuant to Section 4.4.G of this Settlement Agreement for the purpose of recharging the Imported Water into the Basin.
2.20 “Reservation” means the Soboba Indian Reservation as depicted on Exhibit D (map), comprising approximately 5,935 acres, as established by Executive Order on June 19, 1883; thereafter expanded by Executive Orders on January 29, 1887, and December 29, 1891, the purchase of 709.65 acres known at “Tract 8” in 1911, the issuance of a trust patent for 68.9 acres in 1913, and the transfer of 880 acres pursuant to the Southern California Indian Land Transfer Act, Pub. L. No. 100-581, 102 Stat. 2946 (1988); and, thereafter modified by Executive Orders of March 22, 1886, and January 29, 1887, and the issuance of a fee patent for 32.84 acres in 1900. It does not include the 950 acres northwest of and contiguous to the Reservation known as the “Jones Ranch,” purchased by the Soboba Tribe in fee on July 21, 2001, and placed into trust on January 13, 2003, nor the 278.49 acres southeast of and contiguous to the Reservation known as the “Greater Horseshoe,” purchased by the Soboba Tribe in fee in five separate transactions in June and December 2001 and December 2004; nor the 478 acres north of and contiguous to the Reservation known as “Kwiili,” purchased by the Soboba Tribe in fee on April 4, 2004.
2.21 “River” means the surface flow of the San Jacinto River and its tributaries from its origins in the San Jacinto Mountains into and across the Basin as shown on Exhibit B (map).
2.22 “Secretary” means the Secretary of the Interior or her designee.
2.23 “Settlement Agreement” means this document including all exhibits, which are incorporated by reference.
5 2.24 “Soboba Tribe” means the Soboba Band of Luiseño Indians, a body politic and federally recognized Indian tribe, and its individual members.
2.25 “Surface Water” means all surface water flows of the River.
2.26 “Terms of Annexation” means Metropolitan Resolution No. 3940 which sets forth the terms of EMWD’s annexation to MWD.
2.27 “Tribal Water Right” means the Soboba Tribe’s rights to water set forth in Section 4.1.
2.28 “Tunnel” means that portion of the Colorado River Aqueduct known as the San Jacinto Tunnel.
2.29 “United States,” unless otherwise indicated, means the United States of America solely in its capacity as trustee on behalf of the Soboba Tribe or its members.
2.30 “Untreated Replenishment Water” means untreated water sold pursuant to the Replenishment Service program as defined by MWD’s Administrative Code at sections 4104, 4114 and 4514.
2.31 “Upper Pressure Sub-basin” means the groundwater basin as depicted on Exhibit B (map).
2.32 “WMP” means the Water Management Plan that will be developed by EMWD, LHMWD, the City of Hemet, the City of San Jacinto and other Basin users, pursuant to Section
4.8.A of this Settlement Agreement, to manage the Canyon Sub-basin, the Upper Pressure Subbasin downstream to Bridge Street, and the Hemet Basins. The principles of the Water Management Plan are attached as Exhibit E. The area covered by the Water Management Plan is depicted on Exhibit F (map) and described in Exhibit G.
ARTICLE 3 – CONDITIONS PRECEDENT AND ENFORCEMENT
3.1 This Settlement Agreement shall become enforceable, and the releases and waivers of Article 5 effective, as of the date the Secretary causes to be published in the Federal Register a statement of findings that the following conditions have been fulfilled:
A. the Act has been enacted;
6 B. to the extent that the Settlement Agreement conflicts with the Act, the Settlement Agreement has been revised to conform with the Act;
C. the Settlement Agreement, as so revised, and the Waivers and Releases have been executed by the Parties and the Secretary;
D. warranty deeds for the property to be conveyed in fee to the Soboba Tribe pursuant to Section 4.6 have been placed in escrow with instructions that they shall be delivered to the Soboba Tribe by close of business on the first business day following the date that all of the conditions in this paragraph have been fulfilled;
E. the Soboba Tribe and the United States have approved the WMP; F. the Judgment and Decree attached to the Settlement Agreement as Exhibit H have been approved by the United States District Court, Eastern Division of the Central District of California, and that judgment and decree have become final and nonappealable; and G. the Congress of the United States has appropriated the funds and the funds have been deposited in the appropriate accounts pursuant to Sections 4.5 and 4.7.
3.2 Other than to take all necessary steps to cause the events described in this Article to occur, no Party shall be required to perform any of the obligations, or be entitled to any of the benefits, under this Settlement Agreement before all conditions precedent have been fulfilled.
After the fulfillment of all conditions precedent, the Parties shall be bound by all provisions of this Settlement Agreement.
3.3 If all of the conditions listed in Section 3.1 have not been fulfilled by December 31, 2007, this Settlement Agreement shall be null and void, and any consideration, together with any income earned thereon, shall be returned to the depositing entity.
ARTICLE 4 - TRIBAL WATER RIGHTS
4.1 Water Rights. The Parties ratify, confirm, declare to be valid and agree not to object to or dispute or challenge in any judicial or administrative proceedings the rights of the Soboba Tribe and the United States solely in its capacity as trustee for the Soboba Tribe, to the water rights set forth in this Section. In so doing, the Parties acknowledge that these rights are 7 the result of bargained for and exchanged concessions, as a result of which the Local Districts have agreed to supply water to the Soboba Tribe if it is unable, except for mechanical failure of its wells, pumps or water facilities, to produce the water to which it is entitled under this Article.
Therefore, the Soboba Tribe shall have the following water rights which shall be held in trust by the United States for the benefit of the Soboba Tribe:
A. The prior and paramount right, superior to all others, to pump 9,000 AFA from the Basin for any use on the Reservation and lands now owned or hereafter acquired by the Soboba Tribe contiguous to the Reservation or within the Basin.
B. The Soboba Tribe’s right to pump a total of 9,000 AFA from the Basin is without regard to whether the water was naturally or artificially recharged.
C. In the event the Soboba Tribe is unable, except for mechanical failure of its wells, pumps or water facilities, to produce from its existing wells or equivalent replacements up to 3,000 AFA production from the Canyon Sub-basin and the remainder of its Tribal Water Right from the Intake Sub-basin, subject to Section 4.3.A, the Local Districts shall deliver any shortage to the Soboba Tribe. Any shortage shall be delivered at such locations as the Soboba Tribe and the Local Districts may agree, or if there is no agreement, at the wellheads where the shortage occurred. Such water may be supplied from Local District wells in either the Canyon or Intake Sub-basins, or from other sources. For any water delivered pursuant to this paragraph, the Soboba Tribe shall pay an acre-foot charge equal to its then current cost of production, and any avoided cost of treatment, from the wells where the shortage occurred, assuming pumping lifts equal to the Soboba Tribe’s averages in the respective Sub-basins over the preceding ten years.
4.2 Water Quality. Recharged water placed in the Canyon Sub-basin by Local Districts and/or the WMP and any replacement water delivered to the Soboba Tribe pursuant to Section 4.3.C shall conform to all applicable State water quality regulations and, without prior written approval from the Soboba Tribe, shall neither exceed (1) any Federal or State of California primary or secondary drinking water standards (except with respect to recharged water, turbidity, color, or coliform bacteria) nor (2) 0.3 milligrams per liter (mg/l) boron or 0.05 8 mg/l lithium. Recharged water placed in the Intake Sub-basin by EMWD, LHMWD, and/or the WMP shall conform to all applicable State water quality regulations. Nothing in this paragraph shall affect the water quality obligations assumed by Metropolitan for Imported Water set forth in Section 4.4.
4.3 Soboba Tribe’s Water Use. Beginning on the Effective Date, the Soboba Tribe’s right to pump groundwater in the exercise of its Tribal Water Right shall be subject to the following provisions:
A. The Soboba Tribe agrees to limit its exercise of the Tribal Water Right to 4,100 AFA for a period of fifty (50) years commencing with the Effective Date, according to the schedule set forth in Exhibit I to this Settlement Agreement. Should the Soboba Tribe during that period identify a need for water in addition to the Schedule set forth in Exhibit J, the Soboba Tribe shall have the right to purchase water from the WMP at the rate then being charged to the WMP’s municipal producers.
B. Any use of the Tribal Water Right by an individual member of the Soboba Tribe shall be satisfied out of the water resources provided to the Soboba Tribe in this Settlement Agreement.
C. In addition to the limitation in Section 4.3.A, the Soboba Tribe may enter into contracts and options to lease, contracts and options to exchange, or contracts and options to forbear the use of the Tribal Water Right or postpone undertaking new or expanded water uses, provided that any such contract or option for a term greater than five years shall require the approval of the Secretary. Any such water thereby made available to others shall only be used by participants in, or other users within the area of, the WMP. No contract shall be for a term exceeding one hundred (100) years, nor shall any contract provide for permanent alienation of any portion of the Tribal Water Right.
4.4 Purchase of Imported Water [see definition of Imported Water in Section 2.13 of this Settlement Agreement]. In order to provide water to the Soboba Tribe and to reduce the overdraft of the Basin, EMWD and MWD agree to enter into a contract pursuant to which MWD 9 will sell and EMWD on behalf of the WMP will purchase the Imported Water under the following terms:
A. Price. The Imported Water will be sold by MWD to EMWD at the then prevailing service rate charged by MWD for Untreated Replenishment Water, which rate is reflected in MWD’s Administrative Code at section 4401(a)(2). As of the date this Settlement Agreement is signed by MWD, the service rate for such water is $233 per acre foot. Changes in the rates charged for Imported Water shall be effective the same date that the new rates for Untreated Replenishment Water become applicable to MWD’s member agencies. Should MWD ever discontinue the delivery of Untreated Replenishment Water, the service rate for water supplied pursuant to this contract shall initially be determined by taking the last published service rate for Untreated Replenishment Water and charged to EMWD under this contract. Thereafter, the rate for Imported Water would continue to be adjusted on the same percentage basis as MWD’s service rate for the non-interruptible untreated water deliveries to its member agencies, which adjustments shall become effective on the same date that the new service rates become applicable to MWD’s member agencies.
B. Use. For purposes of the Imported Water only, MWD releases EMWD from all covenants that now, or may in the future, require that water purchased at the service rate for Untreated Replenishment Water be left in the ground or otherwise not used for any period of time.
C. Duration. The contract shall commence upon the Effective Date and will expire on December 31, 2035. EMWD and MWD agree to negotiate in good faith a possible extension of this water sale contract for an additional period which, when added to the original term expiring on December 31, 2035, would provide for a total term of 50 years. In determining whether or not to extend the term of this contract for this additional period, MWD will consider the current status of its replenishment water program, the status of MWD’s State Water Project contract, the implementation of this Settlement Agreement, and any other information that MWD deems relevant to the possible extension of the water sale contract. Nothing in this paragraph 10 shall be construed to require MWD to extend the water sale contact.
D. Water Quality. Water sold by MWD pursuant to this contract shall be of a quality that is consistent with MWD’s operational and water quality goals. MWD agrees to make Best Efforts to meet water quality objectives set by the Santa Ana Regional Water Quality Control Board for recharged water being put into the Basin. MWD takes no risks associated with any discrepancy between the water quality obligations assumed by MWD pursuant to this paragraph and water quality standards applicable to recharged water set by the Santa Ana Regional Water Quality Control Board or other regulatory body.
E. Deliveries. Deliveries under this contract shall not begin until the Effective Date.
Once deliveries are commenced, MWD shall use Best Efforts to deliver 7,500 AFA for the duration of the contract based upon 15-year averages. Annual deliveries shall be calculated on a January 1 to December 31 calendar year and shall be pro rated for any portion of a year during which the contract is in force. MWD reserves the right to deliver water at any time of the year.
MWD shall give EMWD advance notice of Imported Water deliveries as provided for in MWD’s then current Administrative Code and implementing guidelines for replenishment water deliveries, which presently is reflected in section 4514(c) of MWD’s Administrative Code.
F. Point of Delivery. Deliveries shall be made by MWD to EMWD at the connection known as EM-14 or, upon mutual agreement of MWD and EMWD, at one or more additional existing or future connections. The Parties acknowledge that the suspension or termination of deliveries to EM-14 may, at any time, as determined by MWD’s Chief Executive Officer, be required to meet MWD’s operational needs. If deliveries to this location are suspended or terminated, then EMWD and MWD agree to negotiate in good faith to identify an alternative delivery point or points and, if MWD and EMWD are unable to reach agreement, the dispute shall be resolved by the Decree Court.
G. Recharge Facilities. The Local Districts, through the WMP, shall construct, operate, and maintain facilities for artificial Groundwater recharge and banking of the Imported Water. Said facilities shall be sufficient to accommodate a flow rate of 42 cubic feet per second 11 and to store up to 40,000 acre feet of Imported Water in the Basin. MWD shall have a paramount right to use capacity in the Recharge Facilities sufficient to accommodate a flow rate of 42 cubic feet per second and a paramount right to store up to 40,000 acre feet of Imported Water to meet its obligations under this Settlement Agreement, provided that MWD’s sole remedy if the required storage capacity is not made available is to reduce its obligation by the amount of water that it was prepared but unable to deliver due to the lack of storage capacity. MWD’s obligations under this Section 4.4 shall not arise until the Recharge Facilities are capable of meeting the capacity and storage requirements set forth in this paragraph.
H. Postponed Deliveries. EMWD shall have the right to postpone deliveries during periods when the Recharge Facilities are not capable of meeting the capacity and storage requirements set forth in Section 4.4.G, provided that each of the following four conditions are met: (i) the inability to meet capacity and storage requirements is the result of events beyond the control of the Local Districts and/or the WMP; (ii) the inability to meet capacity and storage requirements is not the result of negligence on the part of the Local Districts and/or the WMP; (iii) the inability to meet capacity and storage requirements is not the result of water quality limitations that are more restrictive than those established pursuant to Section 4.4.D, and (iv) that the Local Districts use Best Efforts to make necessary repairs and/or take other actions necessary to make the Recharge Facilities fully operational.
(1) If the conditions for postponed deliveries are met as required herein, MWD shall make up such deferred deliveries at a later time, to the extent that MWD has Untreated Replenishment Water available.
(2) If the conditions for postponed deliveries are not met as required herein, then MWD’s obligation to deliver water shall be reduced by the amount of water that MWD was prepared to deliver, subject to the 42 cubic feet per second maximum flow rate, and the existence of unused storage capacity up to the 40,000 acre-foot maximum.
I. Pre-Deliveries. MWD shall have complete discretion concerning use of the 40,000 acre feet of storage capacity for the pre-delivery of Imported Water, including the right 12 not to use such capacity. As such, MWD makes no commitments to pre-deliver any amount of Imported Water.
4.5 Funding for Infrastructure. In accordance with the Act, the United States shall establish in the Treasury of the United States a fund in the amount of $10,000,000, managed by the Secretary of the Interior, which may be drawn upon by EMWD to pay or reimburse costs associated with constructing, operating, and maintaining that portion of the Recharge Facilities necessary to accommodate deliveries of the Imported Water.
4.6 Land Transfer.
A. EMWD Property. In settlement of the Action, EMWD shall place into escrow a warranty deed conveying to the Soboba Tribe in fee all of the property presently owned by EMWD at Domenigoni Parkway and Highway 79, consisting of approximately 106 acres which is described and illustrated in Exhibit J to this Settlement Agreement. The escrow instructions shall provide that the warranty deed shall be delivered to the Soboba Tribe by close of business on the first business day following the Effective Date.
B. MWD Property. In settlement of the Action, MWD shall place into escrow a warranty deed conveying to the Soboba Tribe in fee property presently owned by MWD at Domenigoni Parkway and Patterson Avenue, consisting of approximately 21.7 acres which is described and illustrated in Exhibit K to this Settlement Agreement. The escrow instructions shall provide that the warranty deed shall be delivered to the Soboba Tribe by close of business on the first business day following the Effective Date.
C. The Secretary shall accept into trust for the benefit of the Tribe the lands conveyed to the Tribe pursuant to this Section.
D. Use of Property. Management and development by the Soboba Tribe of the lands transferred by this paragraph shall comply with all applicable Federal law. Any regulation by the Soboba Tribe of the environment on, under or above such lands that impacts MWD’s operations, including but not limited to its operations related to Diamond Valley Reservoir, shall be consistent with, and no more stringent than, comparable regulation by the United States and the 13 State of California.
4.7 Development Funds.
A. Local Districts. No later than 120 days after the Effective Date and before any funds are released to the Local Districts under Section 4.5, the Local Districts shall pay to the Soboba Tribe the sum of $17,000,000 plus interest at the average daily prime rate (as reported by the Wall Street Journal) plus two and one-quarter percent (2.25%) per annum from the Effective Date until paid. These funds are determined to be non-trust funds and shall be managed by the Soboba Tribe in its sole discretion. The United States shall have no responsibility with respect to the funds provided to the Soboba Tribe pursuant to this paragraph.
B. United States. In accordance with the Act, the United States shall establish in the Treasury of the United States a trust fund in the amount of $11,000,000, managed by the Secretary of the Interior in accordance with the American Indian Trust Fund Management Reform Act of 1994 (25 U.S.C. 4001 et seq.) and this Settlement Agreement. There shall be no expenditures from the trust fund until the conditions in Section 3.1 are fulfilled. (1) Investment of the Fund. The Secretary shall invest amounts in this fund in accordance with the Act of April 1, 1880 (21 Stat. 70, ch. 41, 25 U.S.C. 161), the first section of the Act of June 24, 1938 (52 Stat. 1037, ch. 648, 25 U.S.C. 162a), and this paragraph. (2) Fund Uses. This fund may be drawn upon by the Soboba Tribe with the approval of the Secretary to pay or reimburse costs associated with constructing, operating, and maintaining water and sewage infrastructure or other water-related development projects.
4.8 Other Terms.
A. The Local Districts, with the cooperation of other Groundwater producers in the Basin, shall develop and implement a WMP for the Basin that will address the current Basin overdraft, and recognize and take into account the Tribal Water Right. The WMP shall not be final or deemed effective for the purposes of this Settlement until it is approved by the Soboba Tribe and the United States. No implementation or subsequent modification of the WMP shall threaten or adversely affect the rights of the Soboba Tribe hereunder, and the Soboba Tribe and 14 the United States reserve the right under the continuing jurisdiction of the Decree Court to litigate any such issue.
B. EMWD will credit to the Soboba Tribe the sum of $1,000,000 to be deducted from the cost of water and sewage financial participation fees (connection fees) and similar fees charged by EMWD for any property owned by the Soboba Tribe within EMWD’s then existing service area for which service is sought pursuant to an agreement for service between the Soboba Tribe and EMWD. The Soboba Tribe and EMWD agree to negotiate in good faith concerning any future agreement for service which shall be funded in whole or in part by the credit established pursuant to this paragraph.
C. LHMWD will make available for habitat preservation and/or environmental mitigation purposes property it owns in the San Jacinto River bed, consisting of approximately 12 acres which is described and illustrated in Exhibit L to this Settlement Agreement. This property shall be used for habitat preservation and/or environmental mitigation to assist in meeting the requirements of applicable Federal and State environmental laws relating to the Recharge Facilities.
D. In consideration for the benefits received under this Settlement Agreement, the Soboba Tribe shall make available, without transfer of title, up to 98 acres of land for habitat preservation and/or environmental mitigation to assist in meeting the requirements of applicable Federal and State environmental laws relating to the Recharge Facilities. The area from which the Soboba Tribe, in consultation with the United States Fish and Wildlife Service, will select the land to be used for these purposes is described and illustrated in Exhibit M of this Settlement Agreement.
E. The Soboba Tribe agrees to provide the Local Districts with all information reasonably available to the Soboba Tribe that the Local Districts and the Soboba Tribe agree is required to implement this Settlement Agreement and the WMP.
F. MWD shall not be joined in any legal proceeding to enforce the Tribal Water Right described in Sections 4.1 through 4.3 or which concerns the duties and obligations 15 reflected at Section 4.8, paragraphs A through E, unless said proceeding relates to MWD’s failure to perform its obligations to deliver water set forth in Section 4.4.
ARTICLE 5 - RELEASES AND WAIVERS
5.1 Soboba Tribe
A. The Soboba Tribe, on behalf of itself and its members, and the United States solely in its capacity as trustee for the Tribe releases EMWD, LHMWD, and MWD for:
(1) All past, present and future claims to Surface and Groundwater rights for the Reservation, from time immemorial through the Effective Date and anytime thereafter; (2) All past, present and future claims for injury of any kind, whether to person, property, or other right or interest, arising from, or in any way related to, interference with Surface and Groundwater rights and resources of the Reservation, including, but not limited to, all claims for injury to the Soboba Tribe’s use and enjoyment of the Reservation, economic development, religion, language, social structure and culture, and injury to the natural resources of the Reservation, from time immemorial through the Effective Date; (3) All past, present and future claims for injury of any kind, whether to person, property, or other right or interest, arising from, or in any way related to, continuing interference with Surface and Groundwater rights and resources of the Reservation, including the full scope of claims defined in Section 5.1.A(2), to the extent that such continuing interference began prior to the Effective Date, from time immemorial through the Effective Date and anytime thereafter; (4) All past, present and future claims for injury of any kind, whether to person, property, or other right or interest, arising from, or in any way related to, seepage of water into the Tunnel, including the full scope of claims defined in Section 5.1.A(2), from time immemorial through the Effective Date and anytime thereafter.
B. The Soboba Tribe, on behalf of itself and its members, releases the United States for:
(1) All claims described in Section 5.1.A(1)-(4);
(2) All past, present and future claims for failure to acquire or develop water rights 16 and resources of the Reservation from time immemorial through the Effective Date and anytime thereafter;
(3) All past, present and future claims for failure to protect water rights and resources of the Reservation from time immemorial through the Effective Date, and any past, present and future claims for any continuing failure to protect water rights and resources of the Reservation, from time immemorial through the Effective Date and, to the extent that such continuing failure to protect began before the Effective Date, anytime thereafter; (4) All past, present and future claims arising from the failure of any non-federal Party to fulfill the terms of this Settlement Agreement at anytime. (5) All past, present, and future claims arising out of the negotiation of this Settlement Agreement or the negotiation and enactment of the Act, or any specific terms or provisions thereof, including but not limited to the Soboba Tribe’s consent to limit the number of participant parties to this Settlement Agreement.
C. The Soboba Tribe, on behalf of itself and its members, expressly preserves as against all Parties all rights and remedies relating to:
(1) The enforcement of this Settlement Agreement;
(2) The infringement of any water rights arising under Federal or State law which may be appurtenant to property, other than the Reservation, that is now owned or hereafter acquired by the Soboba Tribe, excepting claims identified in Section 5.1.A(4), which relate to Tunnel seepage, and any challenge to approved portions of the WMP.
D. The Soboba Tribe agrees to defend, indemnify, and hold harmless EMWD, LHMWD, MWD, and the United States for any claim seeking damages or other form of relief based upon the rights released by the Soboba Tribe in Section 5.1.A and B, and all of their respective subparts.
5.2 EMWD
A. EMWD shall release LHMWD, MWD, the Soboba Tribe, and the United States from:
17 (1) All past and present claims arising from or in any way related to the claims released by the Soboba Tribe and the United States solely in its capacity as trustee for the Soboba Tribe in Section 5.1, A and B, and all of their respective subparts; and (2) All past and present claims arising from, or in any way related to, interference with EMWD’s Surface and Groundwater rights under Federal or State law from time immemorial through the Effective Date, including, but not limited to, all rights originally belonging to EMWD’s predecessors and/or otherwise acquired by EMWD prior to the Effective Date .
B. Notwithstanding the dispute between EMWD and MWD over the scope of EMWD’s defense and indemnity obligations reflected in Section 8 of Resolution 3940 (the Terms of Annexation) or the language of Section 8, EMWD shall defend and indemnify MWD against all demands, claims, suits, or other administrative or legal proceedings arising from, or in anyway connected to, the infiltration of water into the Tunnel. This obligation shall apply irrespective of when the claim arose or the alleged infringement, harm, or injury occurred.
C. EMWD expressly preserves all rights and remedies relating to:
(1) As against all Parties, the enforcement of this Settlement Agreement; (2) As against all Parties, the infringement of any water rights arising under State law acquired in the future by EMWD; and
(3) As against MWD, the Terms of Annexation, except as expressly agreed to in Section 5.2.B.
5.3 LHMWD
A. LHMWD shall release EMWD, MWD, the Soboba Tribe, and the United States from:
(1) All past and present claims arising from or in any way related to the claims released by the Soboba Tribe and the United States solely in its capacity as trustee for the Soboba Tribe in Section 5.1.A and B, and all of their respective subparts; and (2) All past and present claims arising from, or in any way related to, interference 18 with LHMWD’s Surface and Groundwater rights under Federal or State law from time immemorial through Effective Date.
B. LHMWD expressly preserves all rights and remedies relating to:
(1) As against all Parties, the enforcement of th is Settlement Agreement; and (2) As against all Parties, the infringement of any water rights arising under State law acquired in the future by LHMWD.
5.4 MWD
A. MWD shall release EMWD, LHMWD, the Soboba Tribe, and the United States from:
(1) All past and present claims arising from or in any way related to the claims released by the Soboba Tribe and the United States solely in its capacity as trustee for the Soboba Tribe in Section 5.1.A and B, and all of their respective subparts; and (2) All past and present claims arising from, or in any way related to, interference with MWD’s Surface and Groundwater rights under Federal or State law from time immemorial through the Effective Date .
B. MWD expressly preserves all rights and remedies relating to:
(1) As against all Parties, the enforcement of this Settlement Agreement; (2) As against all Parties, the infringement of any water rights arising under State law acquired in the future by MWD; and
(3) As against EMWD, the Terms of Annexation, except as expressly agreed to in Section 5.2.B.
5.5 All Parties Release of Unknown Claims.
A. Each Party acknowledges and agrees that certain of the releases reflected in Sections 5.1 through 5.5 apply to all claims whether known or unknown to the releasing Party.
B. Each Party certifies that it has read the following provisions of California Civil Code Section 1542:
“A general release does not extend to claims which the creditor does not know or suspect 19 to exist in his favor at the time of executing the release, which if known by him must have materially affected his settlement with the debtor.”
C. Each Party waives the application of California Civil Code Section 1542. In doing so, each Party acknowledges that it is consciously releasing claims that may exist as of the date of this release but which it does not know exist, and which, if known, would materially affect its decision to execute this Settlement Agreement, regardless of whether the Parties’ lack of knowledge is the result of ignorance, oversight, error, negligence, or any other cause.
5.6 Waiver of Sovereign Immunity. If any Party to this Settlement Agreement brings an action or other proceeding in any court of the United States relating only and directly to the interpretation or enforcement of the Act or the Settlement Agreement and names the United States or the Soboba Tribe as a party, the United States, the Tribe, or both, may be joined in any such action, and any claim by the United States or the Tribe to sovereign immunity from the action is waived, other than with respect to claims for monetary awards, for the limited and sole purpose of such interpretation or enforcement.
ARTICLE 6- ADMINISTRATION AND OTHER CONSIDERATIONS
6.1 Disclaimer. Nothing in this Settlement Agreement shall be construed as establishing any standard to be used for the quantification of Federal reserved rights, aboriginal claims, or any other Indian claims to water or lands in any judicial or administrative forum or proceeding. Nothing in this Settlement Agreement shall be construed to quantify or otherwise affect the water rights, claims or entitlements to water of any California tribe, band or community other than the Soboba Tribe.
6.2 Evidentiary Effect of Negotiations. This Settlement Agreement has been arrived at in the process of good faith negotiation for the purpose of resolving legal disputes, including pending litigation, and all Parties agree that no conduct, statements, offers, or compromises made in the course thereof shall be construed as admissions against interest or be used in any legal forum or proceeding other than one for approval, confirmation, interpretation, or enforcement of this Settlement Agreement.
20 6.3 Authorship. The Parties agree that this Settlement Agreement reflects the joint drafting efforts of all Parties. In the event that any dispute, disagreement, or controversy arises regarding this Settlement Agreement, the Parties shall be considered joint authors and no provision shall be interpreted against any Party because of authorship.
6.4 Authorization to Execute. Each Party represents and warrants that she or he is authorized to execute this Settlement Agreement on behalf of the respective Parties to this Settlement Agreement and does so freely and voluntarily.
6.5 Effect of Execution by the Districts. Execution of this Settlement Agreement by the Districts signifies that provisions of this Settlement Agreement affecting the Districts have been approved by their respective Boards of Directors, and these agencies assume the obligations of and are entitled to the benefits of this Settlement Agreement.
6.6 No Inducements. Each Party acknowledges and represents that in executing this Settlement Agreement it has not relied upon any inducements, promises, or representations made by the other Parties which are not reflected in this Settlement Agreement.
6.7 Advice of Counsel. Each Party warrants and represents that, in executing this Settlement Agreement, it has relied upon legal advice from counsel of its choice; that the terms of this Settlement Agreement have been read and its consequences have been completely explained to it by counsel; and that it fully understands the terms of this Settlement Agreement.
6.8 Contingent on Appropriation of Funds. The expenditure or advance of any money or the performance of any obligation by the United States under this Settlement Agreement is contingent upon appropriation of funds therefor. If funds are not appropriated, the United States shall accrue no liability.
6.9 Officials Not to Benefit. No member of or delegate to Congress or Resident Commissioner shall be admitted to any share or part of this Settlement Agreement or to any benefit that may arise from this Settlement Agreement. This restriction shall not be construed to extend to this Settlement Agreement if made with a corporation or company for its general benefit.
21 6.10 Counterparts. This Settlement Agreement may be signed in counterparts by one or more of the Parties, and those counterparts, when taken together, shall have the same force and effect as if a single, original document had been signed by all the Parties.
6.11 Jurisdiction. The Decree Court retains jurisdiction over the Judgment and Decree and the Settlement Agreement.
6.12 Governing Law. This Settlement Agreement shall be construed in accordance with Federal laws and where appropriate the laws of the State of California.
6.13 Successors and Assigns. This Settlement Agreement and the attached waivers and agreements shall, unless otherwise indicated, be binding on and inure to the benefit of the Parties, and their respective successors and assigns.
6.14 Integration. This Settlement Agreement incorporates all the exhibits and sets forth the entire agreement of the Parties with respect to the subject matter hereof, with the exception that EMWD and MWD have resolved certain rights and obligations by way of a Partial Settlement Agreement dated November 14, 2001 which shall remain binding on those two Parties only. This Settlement Agreement may be amended only by written agreement executed by the Parties.
ARTICLE 7- NOTICE AND SIGNATURES
7.1 Notices. Any notice or other communication given under this Settlement Agreement must be in writing and delivered by overnight courier service or certified mail, return receipt requested, postage prepaid and properly addressed to the Parties at the addresses listed below (or to any other or further addresses the Parties may subsequently designate by notice in this manner). All these notices and communication shall be effective when delivery to the required recipient is completed in accordance with this paragraph:
To the Soboba Tribe: Chairperson
Soboba Band of Luiseño Indians
P.O. Box 487
San Jacinto, CA 92581
22 To the United States of America: Asst. Secretary for Indian Affairs U.S. Department of the Interior
1849 C St. NW 4104 MIB
Washington, DC 20240-0001
Chief, U.S. Dept. of Justice
Indian Resources Section
P.O. Box 44378
L’Enfant Plaza Station Washington, DC 20026-4378
cc: Regional Director
Bureau of Indian Affairs
Pacific Region
2800 Cottage Way
Sacramento, CA 95825
To EMWD: General Manager
Eastern Municipal Water District
P.O. Box 8300
Perris, CA 92572-8300
To LHMWD: General Manager
Lake Hemet Municipal Water District
2480 East Florida Avenue
P.O. Box 5039
Hemet, CA 92544
To MWD: Chief Executive Officer
Metropolitan Water District of Southern California
P.O. Box 54153
Los Angeles, California 90054-0153
General Counsel
Metropolitan Water District of Southern California
P.O. Box 54153
Los Angeles, California 90054-0153
IN WITNESS WHEREOF, the Parties have executed this Settlement Agreement on the day and year written below.
SOBOBA BAND OF LUISEÑO INDIANS
Date: ___________ By:
Robert J. Salgado Sr., Chairman
23 THE UNITED STATES OF AMERICA
Date: ___________ By:
THE EASTERN MUNICIPAL WATER
DISTRICT
Date: ___________ By:
Randy A. Record, President
THE LAKE HEMET MUNICIPAL WATER
DISTRICT
Date: ___________ By:
Joseph D. Van Sickle, President
THE METROPOLITAN WATER DISTRICT OF
SOUTHERN CALIFORNIA
Date ___________ By:
Jeffrey Kightlinger, General Manager
24 EXHIBITS TO SETTLEMENT AGREEMENT
A. Soboba Settlement Act
B. Map of the Basin and San Jacinto River
C. Description of the Basin
D. Map of the Soboba Reservation
E Principles for Water Management
F. Map of the Water Management Plan Area
G. Description of the Water Management Plan Area
H. Judgment and Decree
I. Soboba Tribe’s Water Development Schedule
J. Description of EMWD Property
K. Description of MWD Property
L. Description of LHMWD Property
M. Map of Potential Soboba Reservation Lands for Habitat Preservation and/or Environmental Mitigation
Exhibit A – Soboba Settlement Act
SEC. 1. SHORT TITLE.
This Act may be cited as the ‘Soboba Band of Luiseño Indians Settlement Act’.
SEC. 2. FINDINGS AND PURPOSES.
(a) FINDINGS.– The Congress finds the following–
(1) The Soboba Band of Luiseño Indians is a federally-recognized Indian tribe whose Reservation of approximately 6,000 acres, extending east and north from the banks of San Jacinto River in Riverside County, California, was created by an Executive Order of June 19, 1883, and enlarged and modified by subsequent Executive Orders, purchases, and an Act of Congress.
(2) The Tribe’s water rights have not been quantified, and the Tribe has longstanding unresolved claims for interferences with the water resources of its Reservation, which the Tribe maintains have rendered much of the Tribe’s Reservation useless for habitation, livestock, or agriculture. On April 20, 2000, the Tribe filed a lawsuit against The Metropolitan Water District of Southern California for interference with the Tribe’s water resources and damages to its Reservation allegedly caused by Metropolitan’s construction and operation of the San Jacinto Tunnel, which is part of the Colorado River Aqueduct. The lawsuit, styled Soboba Band of Luiseño Indians v. Metropolitan Water District of Southern California, No. 00-04208 GAF (MANx), is pending in the United States District Court for the Central District of California.
(3) The Tribe also has made claims against Eastern Municipal Water District and Lake Hemet Municipal Water District, located adjacent to the Reservation, seeking to secure its water rights and damages arising from alleged past interference with the Tribe’s water resources.
(4) Recognizing that the final resolution of its water rights and claims through litigation will take many years and entail great expense to all parties, continue to limit the Tribe's access to water with economic, social, and cultural consequences to the Tribe, prolong uncertainty as to the availability of water supplies, and seriously impair the long-term economic planning and development of all parties, the Tribe and non-Indian entities have sought to settle their water-related disputes and reduce the burdens of litigation.
(5) After negotiations, which included participation by representatives of the Tribe, the United States, The Metropolitan Water District of Southern California, Eastern Municipal Water District, and Lake Hemet Municipal Water District, the parties have entered into a Settlement Agreement to determine the Tribe’s water rights, resolve all of its claims for interference with the water resources of, and damages to, its Reservation, and provide for the construction of water projects to facilitate the exercise of the Tribe's rights.
(6) Pursuant to the Settlement Agreement, Eastern Municipal Water District and Lake Hemet Municipal Water District acknowledge and assure the Tribe’s prior and paramount right, superior to all others, to pump 9,000 acre-feet of water annually from the San Jacinto River basin. To provide water to the Tribe and to reduce the overdraft of the basin, the two water districts and The Metropolitan Water District of Southern California will contract to import and recharge supplemental water supplies into the basin. The water districts also will make substantial additional contributions to the settlement, including the conveyance of certain replacement lands and economic development funds to the Tribe, to carry out the Settlement Agreement's provisions.
(7) It is appropriate that the United States participate in the implementation of the Settlement Agreement, and contribute funds to enable the Tribe to use its water entitlement in developing its Reservation, and to assist the neighboring nonIndian entities in the construction, operation, and maintenance of the facilities required to recharge the imported water.
(b) PURPOSES.– The purposes of this Act are–
(1) to approve, ratify, and confirm the Settlement Agreement entered into by the Tribe and non-Indians entities;
(2) to authorize and direct the Secretary of the Interior to execute and perform the Settlement Agreement and related waivers;
(3) to authorize the actions, agreements, and appropriations as provided in the Settlement Agreement and this Act.
SEC. 3. DEFINITIONS.
In this Act–
(1) RESTORATION FUND.– The term ‘Restoration Fund’ means the San Jacinto Basin Restoration Fund established by section 6 of this Act. (2) DEVELOPMENT FUND.– The term ‘Development Fund’ means the Soboba Band of Luiseño Indians Water Development Fund established by section 7 of this Act.
(3) RESERVATION.– The term ‘Reservation’ means the Soboba Indian Reservation created by an Executive Order dated June 19, 1883, and enlarged and modified by subsequent Executive Orders, purchases, and an Act of Congress, excluding the 950 acres northwest of and contiguous to the Reservation known as the “Jones Ranch,” purchased by the Soboba Tribe in fee on July 21, 2001, and placed into trust on January 13, 2003, the 129.19 acres southeast of and contiguous to the Reservation known as the “Horseshoe Properties,” purchased by the Soboba Tribe in fee in four separate transactions in June and December 2001, and the 478 acres north of and contiguous to the Reservation known as “Kwiili,” purchased by the Soboba Tribe in fee on April 4, 2004.
(4) SECRETARY.– The term ‘Secretary’ means the Secretary of the Interior or her designee.
(5) SETTLEMENT AGREEMENT.– The term ‘Settlement Agreement’ means that agreement dated __________, 2004, together with all exhibits thereto. The parties to the Settlement Agreement are the Soboba Band of Luiseño Indians and its members, the United States on behalf of the Tribe and its members, The 2 Metropolitan Water District of Southern California, Eastern Municipal Water District, and Lake Hemet Municipal Water District.
(6) TRIBE, SOBOBA TRIBE, or SOBOBA BAND OF LUISEÑO INDIANS.– The terms ‘Tribe’, ‘Soboba Tribe’, or ‘Soboba Band of Luiseño Indians’ means the body politic and federally recognized Indian tribe, and its members. (7) WATER MANAGEMENT PLAN.– The term ‘Water Management Plan’ means the plan, approved by the Soboba Tribe and the Secretary, developed pursuant to Section 4.8, paragraph A of the Settlement Agreement to resolve the overdraft of the San Jacinto basin.
SEC. 4. RATIFICATION OF SETTLEMENT AGREEMENT; AUTHORIZATION. (a) IN GENERAL.– The United States hereby approves, ratifies, and confirms the Settlement Agreement, except to the extent it conflicts with the provisions of this Act, and consents to be made a party to the pending action described in section 2, paragraph (a)(2) of this Act for the purpose of entering the judgment and decree attached to the Settlement Agreement as Exhibit H.
(b) AUTHORIZATION.– The Secretary is authorized and directed to execute, and take such other actions as are necessary to implement, the Settlement Agreement and any amendments approved by the parties necessary to make the Settlement Agreement consistent with this Act.
SEC. 5. AUTHORIZATION OF APPROPRIATIONS.
(a) RESTORATION FUND.– There is authorized to be appropriated to the San Jacinto Basin Restoration Fund established in section 6 of this Act the amount of $10,000,000 to pay or reimburse costs associated with constructing, operating, and maintaining the portion of the basin recharge project, described in Section 4.5 of the Settlement Agreement, necessary to accommodate deliveries of the supplemental imported water under Section 4.4 of the Settlement Agreement.
(b) DEVELOPMENT FUND.– There is authorized to be appropriated to the Soboba Band of Luiseño Indians Water Development Fund established in section 7 of this Act the amount of $11,000,000 to pay or reimburse costs associated with constructing, operating, and maintaining water and sewage infrastructure, and other water-related development projects.
SEC. 6. RESTORATION FUND.
(a) ESTABLISHMENT.– There shall be established within the Treasury of the United States a non-interest bearing account to be known as the ‘San Jacinto Basin Restoration Fund’, consisting of the amounts authorized to be appropriated in section 5, paragraph (a) of this Act.
(b) ADMINISTRATION.– The Restoration Fund shall be administered by the Secretary for the purposes set forth in paragraph (d) of this section. 3 (c) AVAILABILITY.– The funds authorized to be appropriated pursuant to section 5, paragraph (a) of this Act shall be available for expenditure or withdrawal only after the requirements set forth in section 9(e) of this Act and paragraph (d) of this section have been met.
(d) EXPENDITURES AND WITHDRAWALS.–
(1) EXPENDITURE PLAN.–
(A)IN GENERAL.– Eastern Municipal Water District, on behalf of the Water Management Plan, shall submit to the Secretary for approval an expenditure plan for use of the Restoration Fund.
(B)REQUIREMENTS.– The expenditure plan shall require that any funds be expended or reimbursed in accordance with the purposes described in section 5, paragraph (a) of this Act.
(C)APPROVAL.– The Secretary shall approve the expenditure plan if it is reasonable and not inconsistent with this Act.
(2) WITHDRAWALS.– On approval by the Secretary of the expenditure plan described in this section, Eastern Municipal Water District, on behalf of the Water Management Plan, may withdraw monies from the Restoration Fund as provided in the plan.
(3) ENFORCEMENT.– The Secretary may take judicial or administrative action to enforce the provisions of any expenditure plan to ensure that monies withdrawn from the Restoration Fund under the plan are used in accordance with this Act. (4) LIABILITY.– If Eastern Municipal Water District, on behalf of the Water Management Plan, exercises the right to withdraw monies from the Restoration Fund, neither the Secretary nor the Secretary of the Treasury shall retain any liability for the expenditure or investment of the monies withdrawn. (5) ANNUAL REPORT.– Eastern Municipal Water District shall submit to the Tribe and the Secretary an annual report that describes all expenditures from the Restoration Fund during the year covered by the report.
SEC. 7. DEVELOPMENT FUND.
(a) ESTABLISHMENT.– There shall be established within the Treasury of the United States an interest bearing account to be known as the ‘Soboba Band of Luiseño Indians Water Development Fund’, to be managed and invested by the Secretary, consisting of the amounts authorized to be appropriated in section 5, paragraph (b) of this Act. (b) MANAGEMENT.– The Secretary shall manage the Development Fund, make investments, and make monies available for distribution consistent with the American Indian Trust Fund Management Reform Act of 1994 (25 U.S.C. 4001 et seq.) (referred to in this section as the ‘Trust Fund Reform Act’), this Act, and the Settlement Agreement. (c) INVESTMENT.– The Secretary shall invest amounts in the Development Fund in accordance with–
(1) the Act of April 1, 1880 (21 Stat. 70, ch. 41, 25 U.S.C. 161); 4 (2) the first section of the Act of June 24, 1938 (52 Stat. 1037, ch. 648, 25 U.S.C. 162a); and
(3) paragraph (b) of this section.
(d) AVAILABILITY.– The funds authorized to be appropriated pursuant to section 5, paragraph (b) of this Act shall be available for expenditure or withdrawal only after the requirements set forth in section 9(e) of this Act and paragraph (e) below have been met. (e) EXPENDITURES AND WITHDRAWALS.–
(1) TRIBAL MANAGEMENT PLAN.–
(A)IN GENERAL.– The Tribe may withdraw all or part of the Development Fund on approval by the Secretary of a tribal management plan as described in the Trust Fund Reform Act.
(B)REQUIREMENTS.– In addition to the requirements under the Trust Fund Reform Act, the tribal management plan shall require that any funds be expended or reimbursed in accordance with the purposes described in section 5, paragraph (b) of this Act.
(2) ENFORCEMENT.– The Secretary may take judicial or administrative action to enforce the provisions of any tribal management plan to ensure that monies withdrawn from the Development Fund under the plan are used in accordance with this Act.
(3) LIABILITY.– If the Tribe exercises the right to withdraw monies from the Development Fund, neither the Secretary nor the Secretary of the Treasury shall retain any liability for the expenditure or investment of the monies withdrawn. (4) ANNUAL REPORT.– The Tribe shall submit to the Secretary an annual report that describes all expenditures from the Development Fund during the year covered by the report.
(5) NO PER CAPITA DISTRIBUTIONS.– No part of the Development Fund shall be distributed on a per capita basis to members of the Tribe.
SEC. 8. WAIVERS AND RELEASES.
(a) TRIBE AND UNITED STATES AUTHORIZATION.– The Tribe, on behalf of itself and its members, and the Secretary, on behalf of the United States in its capacity as trustee for the Tribe and its members, are authorized, as part of the performance of their obligations under the Settlement Agreement, to execute a waiver and release for claims under Federal, State, or other law against The Metropolitan Water District of Southern California, Eastern Municipal Water District and Lake Hemet Municipal Water District, for any and all–
(1) past, present, and future claims to surface and groundwater rights for the Reservation from time immemorial through the effective date described in section 10 of this Act and anytime thereafter;
(2) past, present, and future claims for injury of any kind, whether to person, property, or other right or interest, arising from, or in any way related to, 5 interference with surface and groundwater rights and resources of the Reservation, including, but not limited to, all claims for injury to the Tribe’s use and enjoyment of the Reservation, economic development, religion, language, social structure and culture, and injury to the natural resources of the Reservation, from time immemorial through the effective date described in section 10 of this Act;
(3) past, present, and future claims for injury of any kind, whether to person, property, or other right or interest, arising from, or in any way related to, continuing interference with surface and groundwater rights and resources of the Reservation, including the full scope of claims defined in Section 5.1, paragraph A(2) of the Settlement Agreement, to the extent that such continuing interference began prior to the effective date described in section 10 of this Act, from time immemorial through the effective date described in section 10 of this Act and anytime thereafter; and
(4) past, present, and future claims for injury of any kind, whether to person, property, or other right or interest, arising from, or in any way related to, seepage of water into the San Jacinto Tunnel, including the full scope of claims defined in Section 5.1, paragraph A(2) of the Settlement Agreement, from time immemorial through the effective date described in section 10 of this Act and anytime thereafter.
(b) TRIBAL WAIVERS AGAINST THE UNITED STATES.– The Tribe is authorized, as part of the performance of its obligations under the Settlement Agreement, to execute a waiver and release for claims against the United States (acting in its capacity as trustee for the Tribe or its members, or otherwise acting on behalf of the Tribe or its members), including any agencies, officials, or employees thereof, for any and all– (1) claims described in paragraph (a) of this section;
(2) past, present, and future claims for failure to acquire or develop water rights and resources of the Reservation from time immemorial through the effective date described in section 10 of this Act and anytime thereafter; (3) past, present, and future claims for failure to protect water rights and resources of the Reservation from time immemorial through the effective date described in section 10 of this Act, and any past, present, and future claims for any continuing failure to protect water rights and resources of the Reservation, from time immemorial through the effective date described in section 10 of this Act and, to the extent that such continuing failure to protect began before the effective date described in section 10 of this Act, anytime thereafter; (4) past, present, and future claims arising from the failure of any non-federal Party to fulfill the terms of the Settlement Agreement at anytime; and (5) past, present, and future claims arising out of the negotiation of the Settlement Agreement or the negotiation and enactment of this Act, or any specific terms or provisions thereof, including, but not limited to, the Tribe’s consent to limit the number of participant parties to the Settlement Agreement. 6 SEC. 9. MISCELLANEOUS PROVISIONS.
(a) WAIVER OF SOVEREIGN IMMUNITY.– If any party to the Settlement Agreement brings an action or other proceeding in any court of the United States relating only and directly to the interpretation or enforcement of this Act or the Settlement Agreement and names the United States or the Soboba Tribe as a party– (1) the United States, the Tribe, or both, may be joined in any such action; and (2) any claim by the United States or the Tribe to sovereign immunity from the action is waived, other than with respect to claims for monetary awards, for the limited and sole purpose of such interpretation or enforcement. (b) TRIBAL USE OF WATER.–
(1) IN GENERAL.– With respect to water rights made available under the Settlement Agreement–
(A)the Tribe may use water made available to it under the Settlement Agreement for any use it deems advisable on the Reservation and on any other lands it owns or may acquire, in fee or in trust, contiguous to the Reservation or within the area of the groundwater basin described in Section 2.4 of the Settlement Agreement;
(B)such water rights shall be held in trust by the United States in perpetuity, and shall not be subject to forfeiture or abandonment; and (C)State law shall not apply to the Tribe’s use of water made available to it under the Settlement Agreement.
(2) LIMITATION.–
(A)IN GENERAL.– Except as provided in paragraph (B) below, the Tribe shall not sell or lease water made available to it under the Settlement Agreement.
(B) EXCEPTION.– The Tribe may enter into contracts and options to lease, contracts and options to exchange, or contracts and options to forbear the use of water made available to it under the Settlement Agreement or postpone undertaking new or expanded water uses, provided that any such contract or option for a term greater than five years shall require the approval of the Secretary. Any such water thereby made available to others shall only be used by participants in, or other users within the area of, the Water Management Plan described in Section 2.32 of the Settlement Agreement. No contract shall be for a term exceeding one hundred years, nor shall any contract provide for permanent alienation of any portion of the water rights made available under the Settlement Agreement.
(c) ACCEPTANCE OF LAND INTO TRUST.– The Secretary shall accept into trust for the benefit of the Tribe the lands conveyed to the Tribe pursuant to Section 4.6 of the Settlement Agreement, which conveyed lands shall be considered for all purposes as if 7 they were so acquired into trust status in 1937, except as to valid rights existing at the time of acquisition pursuant to this Act.
(d) HABITAT CONSERVATION.– The United States, in its capacity as trustee for the Tribe, and the Tribe in its own right shall make available, including, if necessary, by conveyance of a permanent easement to the United States Fish and Wildlife Service or other agency of the United States, up to 98 acres of Reservation land for habitat conservation related to the portion of the basin recharge project necessary to accommodate deliveries of the supplemental imported water described in Section 4.4 of the Settlement Agreement.
(e) AVAILABILITY OF APPROPRIATIONS.– The funds authorized to be appropriated under section 5 of this Act shall not be available for expenditure or withdrawal until the requirements of section 10(a) of this Act have been met and the waivers and releases set out in section 8 of this Act become effective.
(f) RETENTION OF RIGHTS.–
(1) In the event the waivers and releases set out in section 8 of this Act do not become effective pursuant to section 10(a) of this Act, the Soboba Tribe and the United States shall retain the right to assert all rights and claims enumerated in section 8, and any claims or defenses of the parties to the Settlement Agreement shall also be retained.
(2) The parties expressly reserve all rights not specifically granted, recognized, waived, or released by the Settlement Agreement or this Act. (g) PRECEDENT.– Nothing in this Act shall be construed or interpreted as a precedent for the quantification or litigation of federal reserved water rights or the interpretation or administration of future water settlement Acts.
(h) OTHER INDIAN TRIBES.– Nothing in the Settlement Agreement or this Act shall be construed in any way to quantify or otherwise adversely affect the water rights, claims, or entitlements to water of any Indian tribe, band, or community, other than the Soboba Tribe.
(i) ENVIRONMENTAL COMPLIANCE.–
(1) Signing by the Secretary of the Settlement Agreement does not constitute major Federal action under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
(2) The Secretary shall comply with all aspects of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), and other applicable environmental laws, in implementing the terms of the Settlement Agreement and this Act.
SEC. 10.EFFECTIVE DATE.
(a) IN GENERAL.– The waiver and release authorizations contained in subsections (b) and (c) of section 8 of this Act shall become effective as of the date the Secretary causes to be published in the Federal Register a statement of findings that– (1) this Act has been enacted;
8 (2) to the extent that the Settlement Agreement conflicts with this Act, the Settlement Agreement has been revised to conform with the Act; (3) the Settlement Agreement, revised as necessary, and the waivers and releases described in Article 5 of the Settlement Agreement and section 8 of this Act have been executed by the parties and the Secretary; (4) warranty deeds for the property to be conveyed to the Tribe described in section 4.6 of the Settlement Agreement have been placed in escrow; (5) the Tribe and the Secretary have approved the Water Management Plan; (6) the judgment and decree attached to the Settlement Agreement as Exhibit H has been approved by the United States District Court, Eastern Division of the Central District of California, and that judgment and decree have become final and nonappealable; and
(7) the payment of the funds authorized by section 5 of this Act have been appropriated and deposited into the Restoration Fund and the Development Fund.
(b) DEADLINE FOR EFFECTIVE DATE.– If the conditions precedent required under paragraph (a) of this section have not been fulfilled by December 31, 2007, the Settlement Agreement and this Act shall not thereafter be effective and shall be null and void. Any funds and the interest accrued thereon appropriated pursuant to section 5 shall revert to the general fund of the United States Treasury on October 1, 2008. 9 DIAMOND VALLEY LAKE
LAKE HEMET
SOUTH FORK
SAN JACINTO RIVER
SAN JACINTO RIVER
NORTH FORK
HERKEY
CREEK
STRAWBERRY CREEK
DRY CREEK
RAMONA EXPWY
HWY 79
HWY 74
HWY 79
STATE ST.
DOMENIGONI PKWY
HWY 74
BRIDGE STREET
SANDERSON AV
2 1
11 12
3 2 1 6 5 4
7 8
9 10 11 12
14 13
24 6 5
7 8
3 2 1 6 5 4
7 8
9 10 11 12
13 18 17 16 15 14
19 20 21 22 23 24
29 28 27 26 25 30
31 32 33 34 35 36
1 3 2 6 5 4
7 8 910 11 12
18 17 16 15 14 13
19 20 21 22 23 24
29 28 27 26 25 30
31 32 33 34 35 36
2 1
11 12
14 13
23 24
26 25
35 36
2 1
11 12
13 14
23 24
26 25
35 36
6 5 4
7 8 9 10 11 12
17 16 15 14 13
18 19 20 21 23 24
29 28 27 26 25 30
31 32 33 34 35
18 19
20 21 22
30 29 28 27
31 32 33 34
31 32 35 36 33
22 36
18 17 16
21 19 20
30 29 28
22 36
CANYON
SUBBASIN
INTAKE
SUBBASIN
UPPER PRESSURE
NOTE:
UPPER PRESSURE INCLUDES
INTAKE SUBBASIN
NORTH
1”=12,500’
02-25-2004
T.5S. R.1W.
T.4S. R.1W.
T.5S. R.2W.
T.4S. R.2W.
Exhibit B
Map of the Basin and the San Jacinto River
0 9,500’ 19,000’
Exhibit C – Description of the Basin
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
Legal Description for Canyon Sub-basin
Beginning at a point lying North 03-03-37 East, a distance of 8693.42 feet from the north one quarter corner of Section 7, Township 5 South, Range 1 East, S.B.B. & M.:
Thence South 33-29-10 East, a distance of 1188.9727
Thence South 20-26-50 East, a distance of 500.9370
Thence South 27-28-23 East, a distance of 428.6517
Thence South 31-35-33 East, a distance of 630.8741
Thence South 21-07-46 East, a distance of 910.5965
Thence South 18-48-47 East, a distance of 1015.1730
Thence South 24-22-09 East, a distance of 638.3066
Thence South 14-50-24 East, a distance of 1778.9616
Thence South 09-47-36 East, a distance of 1132.4407
Thence South 10-53-51 East, a distance of 909.1444
Thence South 21-23-19 East, a distance of 960.3948
Thence South 16-05-57 East, a distance of 627.4825
Thence South 17-13-52 East, a distance of 1029.1928
Thence South 26-09-14 East, a distance of 249.2721
Thence South 46-45-44 East, a distance of 1246.0249
Thence South 45-42-20 East, a distance of 804.0414
Thence South 53-45-51 East, a distance of 494.8303
Thence South 41-51-15 East, a distance of 662.8068
Thence South 37-57-12 East, a distance of 682.2970
Thence South 44-35-54 East, a distance of 598.8896
Thence South 31-20-45 East, a distance of 1101.0137
Thence South 37-47-48 East, a distance of 1333.2990
Thence South 55-04-55 East, a distance of 865.4271
Thence South 61-29-59 East, a distance of 379.0620
Thence South 66-22-49 East, a distance of 339.4363
Thence South 42-07-01 East, a distance of 362.8961
Thence South 59-20-26 East, a distance of 310.8241
Thence North 44-35-20 West, a distance of 271.0057
Thence North 27-14-21 West, a distance of 679.4763
Thence North 09-26-25 West, a distance of 669.1250
Thence North 15-50-43 West, a distance of 716.4738
Thence North 22-47-41 West, a distance of 436.5304
Thence North 20-37-42 West, a distance of 399.1550
Thence North 05-56-49 West, a distance of 259.3960
Thence North 12-05-28 West, a distance of 264.3646
Thence North 14-27-19 East, a distance of 118.1782
Thence North 50-21-25 East, a distance of 158.1102
Thence North 65-13-15 East, a distance of 328.2188
Thence North 82-49-41 East, a distance of 264.3181
Thence South 84-49-29 East, a distance of 420.5895
Thence South 77-19-12 East, a distance of 411.1524
Thence South 62-03-23 East, a distance of 453.0744
Thence South 53-30-14 East, a distance of 237.5929
Thence South 57-59-51 East, a distance of 266.6488
Thence South 66-45-48 East, a distance of 360.0835
Thence South 74-02-50 East, a distance of 326.3171
Thence South 70-08-39 East, a distance of 314.8424
Thence South 63-01-30 East, a distance of 234.3736
Thence South 35-38-22 East, a distance of 237.4798
Exhibit C – Description of the Basin
57 Thence South 42-04-07 East, a distance of 284.3200
58 59
60 61
62 63
64 65
66 67
68 69
70 71
72 73
74 75
76 77
78 79
80 81
82 83
84 85
86 87
88 89
90 91
92 93
94 95
96 97
98 99
100
101
102
103
104
105
106
107
108
109
110
111
112
Thence South 48-59-46 East, a distance of 322.1632
Thence South 55-05-28 East, a distance of 338.9985
Thence South 76-41-52 East, a distance of 627.2030
Thence South 80-50-12 East, a distance of 689.1699
Thence South 68-34-43 East, a distance of 243.1736
Thence South 51-17-14 East, a distance of 422.9187
Thence South 23-13-07 East, a distance of 305.0162
Thence South 17-07-37 East, a distance of 348.0598
Thence South 20-36-34 East, a distance of 243.2560
Thence South 77-20-44 East, a distance of 411.1112
Thence North 88-22-32 East, a distance of 489.4467
Thence South 89-35-23 East, a distance of 209.5054
Thence South 77-48-51 East, a distance of 428.1470
Thence South 46-33-41 East, a distance of 358.4156
Thence South 54-02-09 East, a distance of 300.5375
Thence North 76-21-42 East, a distance of 288.1242
Thence North 17-30-54 East, a distance of 237.5765
Thence North 16-48-48 East, a distance of 309.4149
Thence North 34-06-01 East, a distance of 125.9718
Thence North 84-56-56 East, a distance of 368.4308
Thence South 89-35-24 East, a distance of 227.1308
Thence South 79-15-43 East, a distance of 390.4622
Thence South 89-35-24 East, a distance of 751.1442
Thence North 68-02-21 East, a distance of 321.0451
Thence North 76-24-34 East, a distance of 144.1615
Thence North 82-57-46 East, a distance of 405.0514
Thence North 77-54-02 East, a distance of 322.0287
Thence South 66-25-23 East, a distance of 265.9506
Thence South 68-58-41 East, a distance of 149.3127
Thence North 54-52-10 East, a distance of 300.6385
Thence North 29-27-12 East, a distance of 179.7287
Thence North 56-43-55 East, a distance of 251.9098
Thence South 81-28-20 East, a distance of 370.4709
Thence South 78-57-07 East, a distance of 284.3959
Thence South 67-47-29 East, a distance of 470.2621
Thence South 83-24-48 East, a distance of 650.0405
Thence South 87-51-03 East, a distance of 576.6556
Thence North 81-40-49 East, a distance of 229.7933
Thence South 89-34-59 East, a distance of 524.0139
Thence South 80-08-29 East, a distance of 424.8993
Thence South 68-58-59 East, a distance of 149.1738
Thence South 85-18-12 East, a distance of 700.7279
Thence North 69-21-28 East, a distance of 243.2410
Thence North 83-18-13 East, a distance of 140.9616
Thence North 87-02-55 East, a distance of 297.3945
Thence South 84-24-08 East, a distance of 385.7145
Thence South 73-38-13 East, a distance of 381.5806
Thence South 60-46-31 East, a distance of 398.7573
Thence South 44-33-51 East, a distance of 197.5537
Thence South 44-36-26 East, a distance of 148.2746
Thence South 80-51-20 East, a distance of 229.6689
Thence South 77-41-23 East, a distance of 339.1733
Thence South 80-08-20 East, a distance of 106.1940
Thence South 74-17-21 East, a distance of 199.1918
Thence South 63-03-57 East, a distance of 156.1926
Exhibit C – Description of the Basin
113 Thence South 89-35-24 East, a distance of 139.7536
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
Thence North 69-52-16 East, a distance of 149.1074
Thence South 74-22-05 East, a distance of 199.2446
Thence South 54-02-09 East, a distance of 150.2688
Thence South 57-32-02 East, a distance of 164.7486
Thence South 80-08-39 East, a distance of 212.5112
Thence South 81-28-20 East, a distance of 246.9807
Thence South 57-34-32 East, a distance of 164.8208
Thence South 59-51-45 East, a distance of 281.7053
Thence South 49-18-45 East, a distance of 297.3849
Thence South 53-35-18 East, a distance of 237.6448
Thence South 41-33-00 East, a distance of 235.0086
Thence South 49-00-08 East, a distance of 483.1160
Thence South 55-49-43 East, a distance of 125.8518
Thence South 44-35-25 East, a distance of 123.5701
Thence South 44-36-30 East, a distance of 271.6237
Thence South 44-36-10 East, a distance of 197.5973
Thence South 31-11-39 East, a distance of 266.6825
Thence South 29-50-24 East, a distance of 242.6743
Thence South 26-09-18 East, a distance of 273.3663
Thence South 28-55-20 East, a distance of 320.7559
Thence South 44-37-15 East, a distance of 247.0063
Thence South 39-21-54 East, a distance of 136.3797
Thence South 39-30-43 East, a distance of 1115.9357
Thence South 56-57-13 East, a distance of 518.5041
Thence South 32-18-58 East, a distance of 290.6424
Thence South 54-36-52 East, a distance of 213.2716
Thence South 47-36-34 East, a distance of 234.9146
Thence South 44-35-24 East, a distance of 172.8920
Thence South 35-05-29 East, a distance of 150.2478
Thence South 59-20-24 East, a distance of 242.6739
Thence South 59-19-30 East, a distance of 242.5664
Thence South 89-35-24 East, a distance of 139.7536
Thence South 89-35-24 East, a distance of 139.7536
Thence South 89-35-23 East, a distance of 52.3763
Thence North 67-16-06 East, a distance of 132.9522
Thence North 00-24-32 East, a distance of 52.5643
Thence North 33-16-47 West, a distance of 62.8730
Thence North 58-37-01 West, a distance of 203.6710
Thence North 47-58-30 West, a distance of 210.3380
Thence North 50-17-39 West, a distance of 248.1038
Thence North 41-34-22 West, a distance of 235.0915
Thence North 35-34-47 West, a distance of 237.6102
Thence North 52-44-11 West, a distance of 261.9812
Thence North 49-21-11 West, a distance of 297.5341
Thence North 49-21-20 West, a distance of 297.3572
Thence North 44-34-50 West, a distance of 271.7576
Thence North 38-15-35 West, a distance of 335.4983
Thence North 27-27-57 West, a distance of 336.0671
Thence North 50-30-00 West, a distance of 360.1165
Thence North 21-23-39 West, a distance of 470.1461
Thence North 10-11-56 West, a distance of 284.4954
Thence North 07-44-11 West, a distance of 246.9982
Thence North 19-33-17 West, a distance of 204.2826
Thence North 41-52-09 West, a distance of 259.7636
Thence North 63-00-09 West, a distance of 429.5609
Exhibit C – Description of the Basin
169 Thence North 43-07-25 West, a distance of 481.8419
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
Thence North 42-44-17 West, a distance of 382.9316
Thence North 28-24-46 West, a distance of 398.7864
Thence North 28-23-07 West, a distance of 398.6130
Thence North 38-46-12 West, a distance of 608.4346
Thence North 72-21-04 West, a distance of 530.2057
Thence North 77-53-41 West, a distance of 517.3797
Thence North 84-31-51 West, a distance of 596.0885
Thence North 68-33-48 West, a distance of 486.5318
Thence North 67-12-28 West, a distance of 642.2768
Thence North 76-42-02 West, a distance of 627.0671
Thence North 60-32-28 West, a distance of 899.1237
Thence North 75-54-13 West, a distance of 665.1543
Thence North 66-23-19 West, a distance of 665.0515
Thence North 80-51-29 West, a distance of 459.4613
Thence North 74-27-13 West, a distance of 669.4943
Thence North 63-02-06 West, a distance of 312.4704
Thence North 73-53-13 West, a distance of 580.5569
Thence North 76-51-43 West, a distance of 555.1563
Thence North 72-03-23 West, a distance of 347.9228
Thence North 71-08-13 West, a distance of 497.2030
Thence North 69-01-58 West, a distance of 746.1565
Thence North 46-26-06 West, a distance of 382.9739
Thence North 55-28-34 West, a distance of 654.0611
Thence North 65-37-13 West, a distance of 516.0126
Thence North 73-38-41 West, a distance of 508.7107
Thence North 70-36-46 West, a distance of 591.0123
Thence North 69-01-55 West, a distance of 447.6429
Thence North 64-48-32 West, a distance of 1750.7575
Thence North 68-24-13 West, a distance of 917.8053
Thence North 68-02-33 West, a distance of 1427.2827
Thence North 64-07-22 West, a distance of 1625.0677
Thence North 43-46-42 West, a distance of 876.7911
Thence North 47-49-40 West, a distance of 655.7561
Thence North 61-41-57 West, a distance of 335.8997
Thence North 51-42-49 West, a distance of 199.2231
Thence North 48-40-34 West, a distance of 346.7099
Thence North 47-34-33 West, a distance of 235.0408
Thence North 36-26-36 West, a distance of 174.6548
Thence North 09-53-20 East, a distance of 106.2668
Thence South 78-41-19 East, a distance of 462.3561
Thence South 74-50-24 East, a distance of 343.1933
Thence South 79-53-51 East, a distance of 726.5141
Thence South 82-28-31 East, a distance of 422.3874
Thence North 74-29-44 East, a distance of 254.3821
Thence North 67-11-37 East, a distance of 399.0744
Thence North 60-41-37 East, a distance of 281.6756
Thence North 79-05-27 East, a distance of 445.1700
Thence North 00-26-51 East, a distance of 192.0059
Thence North 31-36-58 West, a distance of 164.7668
Thence North 80-07-13 West, a distance of 637.4534
Thence North 79-17-00 West, a distance of 585.8427
Thence North 83-52-06 West, a distance of 702.1421
Thence North 81-40-22 West, a distance of 634.8176
Thence North 71-46-52 West, a distance of 513.7552
Thence North 78-48-11 West, a distance of 746.7136
Exhibit C – Description of the Basin
225 Thence North 70-26-56 West, a distance of 905.9868
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
Thence North 65-52-49 West, a distance of 2823.3710
Thence North 52-03-27 West, a distance of 1519.7285
Thence North 36-15-37 West, a distance of 1023.5333
Thence North 28-50-12 West, a distance of 1501.3573
Thence North 03-16-40 East, a distance of 699.5825
Thence North 40-00-38 East, a distance of 657.5376
Thence North 55-55-24 East, a distance of 339.1029
Thence North 56-42-53 East, a distance of 377.8643
Thence North 26-59-25 East, a distance of 312.6105
Thence North 71-58-47 East, a distance of 497.0045
Thence North 80-06-42 East, a distance of 585.9547
Thence South 87-23-25 East, a distance of 454.3462
Thence North 42-41-35 East, a distance of 519.3043
Thence North 65-30-29 East, a distance of 539.2736
Thence North 85-13-27 East, a distance of 192.9198
Thence South 77-48-22 East, a distance of 428.1601
Thence South 79-18-05 East, a distance of 195.2692
Thence North 69-51-14 East, a distance of 298.5136
Thence North 28-19-28 East, a distance of 335.9044
Thence North 31-22-11 East, a distance of 305.6825
Thence North 56-01-15 East, a distance of 402.0238
Thence North 82-39-26 East, a distance of 387.8052
Thence North 78-08-24 East, a distance of 411.1519
Thence North 60-22-03 East, a distance of 383.3919
Thence North 59-26-14 East, a distance of 203.6705
Thence North 05-12-58 East, a distance of 210.3711
Thence North 54-35-53 West, a distance of 426.4772
Thence North 11-40-50 West, a distance of 250.0533
Thence North 49-48-05 East, a distance of 161.0345
Thence North 48-23-44 East, a distance of 235.0392
Thence North 00-24-37 East, a distance of 174.5675
Thence North 23-13-24 West, a distance of 304.9592
Thence North 70-45-15 East, a distance of 259.7676
Thence South 78-49-18 East, a distance of 373.3326
Thence South 72-19-46 East, a distance of 530.4007
Thence North 68-01-44 East, a distance of 321.0687
Thence North 61-21-05 East, a distance of 179.8988
Thence North 15-39-15 East, a distance of 199.2007
Thence North 00-24-37 East, a distance of 174.5675
Thence North 09-52-20 West, a distance of 195.3932
Thence North 38-41-05 West, a distance of 359.9806
Thence North 38-15-35 West, a distance of 335.4983
Thence North 24-47-03 West, a distance of 328.3020
Thence North 18-01-30 West, a distance of 220.9698
Thence North 00-27-21 East, a distance of 157.1300
Thence North 24-36-33 West, a distance of 289.0680
Thence North 26-08-49 West, a distance of 195.4380
Thence North 37-10-21 West, a distance of 286.5286
Thence North 71-10-31 West, a distance of 276.0141
Thence North 89-35-24 West, a distance of 366.7594
Thence North 47-18-37 West, a distance of 259.8516
Thence North 02-26-15 West, a distance of 349.7545
Thence North 02-27-48 West, a distance of 125.0526
Thence North 02-27-50 West, a distance of 78.5106
Thence North 02-27-01 West, a distance of 146.1957
Exhibit C – Description of the Basin
281 Thence North 05-17-26 West, a distance of 351.1208
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
Thence North 29-50-24 West, a distance of 242.6743
Thence North 87-54-29 West, a distance of 594.1460
Thence South 25-25-45 West, a distance of 289.0690
Thence South 07-33-35 West, a distance of 54.1577
Thence South 07-31-36 West, a distance of 368.3617
Thence South 15-40-43 West, a distance of 398.2550
Thence South 21-34-12 West, a distance of 580.7325
Thence South 17-07-05 West, a distance of 546.9813
Thence South 18-03-11 West, a distance of 403.3575
Thence South 25-37-23 West, a distance of 328.0751
Thence South 34-42-09 West, a distance of 465.0331
Thence South 25-01-48 West, a distance of 461.1868
Thence South 54-23-57 West, a distance of 475.1916
Thence South 69-37-52 West, a distance of 541.7496
Thence North 73-56-54 West, a distance of 453.4280
Thence North 48-34-43 West, a distance of 532.4290
Thence North 28-23-07 West, a distance of 398.6121
Thence North 54-35-53 West, a distance of 426.4777
Thence North 16-41-42 West, a distance of 237.5764
Thence North 12-06-59 West, a distance of 322.1772
Thence North 33-16-47 West, a distance of 251.7194
Thence North 60-46-31 West, a distance of 398.7569
Thence North 40-31-06 West, a distance of 346.7031
Thence North 29-18-46 West, a distance of 281.6207
Thence North 31-34-49 West, a distance of 329.6291
Thence North 65-37-55 West, a distance of 344.1602
Thence North 33-16-48 West, a distance of 314.8173
Thence North 40-10-53 West, a distance of 160.9938
Thence South 48-09-08 West, a distance of 259.5913
Thence South 05-10-56 West, a distance of 210.3598
Thence South 01-52-06 East, a distance of 437.1073
Thence South 17-14-28 East, a distance of 403.1796
Thence South 16-17-52 East, a distance of 546.9801
Thence South 17-24-29 East, a distance of 513.9131
Thence South 44-35-54 East, a distance of 296.2405
Thence South 40-10-11 East, a distance of 322.2593
Thence South 35-07-29 East, a distance of 300.4644
Thence South 31-25-13 East, a distance of 596.0948
Thence South 27-28-50 East, a distance of 335.9003
Thence South 04-21-44 East, a distance of 210.3594
Thence South 42-01-35 West, a distance of 210.4263
Thence South 45-23-50 West, a distance of 197.5089
Thence South 52-08-16 West, a distance of 422.9006
Thence South 45-24-36 West, a distance of 469.3541
Thence South 70-25-56 West, a distance of 408.8638
Thence South 66-59-15 West, a distance of 571.0711
Thence South 33-18-10 West, a distance of 353.7851
Thence South 37-17-32 West, a distance of 349.2845
Thence South 49-29-46 West, a distance of 346.7099
Thence South 65-13-51 West, a distance of 328.1924
Thence South 55-43-12 West, a distance of 276.0820
Thence South 59-26-46 West, a distance of 407.4482
Thence South 55-41-57 West, a distance of 385.3996
Thence South 74-49-34 West, a distance of 746.6568
Thence South 88-29-17 West, a distance of 502.1748
Exhibit C – Description of the Basin
337 Thence North 70-28-56 West, a distance of 460.1936
338
339
340
341
342
343
344
345
346
Thence North 69-36-20 West, a distance of 783.2207
Thence North 43-33-28 West, a distance of 939.4676
Thence South 90-00-00 East, a distance of 0.0000
to the point of beginning.
Perimeter: 140686.1563
Area: 191218952.8402 4389.7831 acres
Exhibit C – Description of the Basin
(Continued)
1 Legal Description for Intake Sub-basin
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 29
30 31
32 33
34 35
36 37
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 Beginning at a point lying North 03-03-37 East, a distance of 8693.42 feet from the north one quarter corner of Section 7, Township 5 South, Range 1 East, S.B.B. & M.:
Thence North 43-33-19 West, a distance of 1036.0201
Thence North 40-54-46 West, a distance of 2583.7541
Thence North 31-11-35 West, a distance of 1531.8376
Thence North 29-04-17 West, a distance of 883.9252
Thence North 09-00-43 East, a distance of 1454.7700
Thence North 54-11-24 West, a distance of 779.7834
Thence North 87-31-53 West, a distance of 469.5258
Thence South 14-02-10 West, a distance of 1192.3299
Thence South 19-44-49 West, a distance of 1658.1895
Thence South 20-33-22 West, a distance of 1709.5454
Thence South 30-34-45 West, a distance of 1022.5993
Thence South 37-11-05 West, a distance of 1456.6566
Thence South 37-20-58 West, a distance of 1912.8988
Thence South 36-19-37 West, a distance of 1688.8119
Thence South 47-17-26 West, a distance of 1415.9609
Thence South 51-20-25 West, a distance of 1024.9459
Thence South 62-35-33 West, a distance of 1217.0825
Thence South 67-50-01 West, a distance of 1166.6981
Thence South 53-21-57 West, a distance of 2545.3471
Thence South 51-32-23 East, a distance of 1521.6193
Thence South 52-06-41 East, a distance of 3640.2127
Thence South 54-16-42 East, a distance of 2832.0686
Thence South 54-45-45 East, a distance of 8093.9477
Thence South 66-45-32 East, a distance of 1985.2225
Thence South 63-00-45 East, a distance of 1076.6119
Thence South 57-44-44 East, a distance of 10768.6202
Thence South 52-42-56 East, a distance of 2888.8756
Thence South 55-53-51 East, a distance of 6249.5878
Thence South 52-42-56 East, a distance of 2888.8756
Thence South 53-45-11 East, a distance of 2138.0014
Thence South 64-43-22 East, a distance of 2206.1030
Thence North 46-42-44 West, a distance of 156.7825
Thence North 44-35-15 West, a distance of 405.2711
Thence North 46-18-48 West, a distance of 669.1426
Thence North 37-52-35 West, a distance of 693.8574
Thence North 34-17-42 West, a distance of 906.2395
Thence North 33-57-07 West, a distance of 659.8059
Thence North 44-35-16 West, a distance of 608.0830
Thence North 46-47-40 West, a distance of 1054.3274
Thence North 48-19-10 West, a distance of 1868.4824
Thence North 56-06-31 West, a distance of 2130.4779
Thence North 66-07-44 West, a distance of 1655.6256
Thence North 58-12-53 West, a distance of 1376.2780
Thence North 41-24-29 West, a distance of 730.8163
Thence North 41-13-30 West, a distance of 345.0212
Thence North 26-08-55 West, a distance of 384.6138
Thence North 13-37-46 West, a distance of 354.3535
Thence North 41-34-35 West, a distance of 385.5755
Thence North 42-50-20 West, a distance of 669.1777
Exhibit C – Description of the Basin
(Continued)
57 Thence North 50-29-55 West, a distance of 1181.6210
58 59
60 61
62 63
64 65
66 67
68 69
70 71
72 73
74 75
76 77
78 79
80 81
82 83
84 85
86 87
88 89
90 91
92 93
94 95
96 97
98 99
100
101
Thence North 31-24-48 West, a distance of 978.2580
Thence North 26-09-14 West, a distance of 704.9949
Thence North 08-33-23 West, a distance of 551.1343
Thence North 10-42-42 East, a distance of 640.9180
Thence North 35-06-54 East, a distance of 453.0875
Thence North 45-23-44 East, a distance of 243.3389
Thence North 52-32-18 East, a distance of 326.7674
Thence North 00-25-00 East, a distance of 171.8795
Thence North 34-34-34 West, a distance of 349.7803
Thence North 44-35-13 West, a distance of 337.0774
Thence North 59-20-26 West, a distance of 310.8241
Thence North 42-07-01 West, a distance of 362.8961
Thence North 66-22-49 West, a distance of 339.4363
Thence North 61-29-59 West, a distance of 379.0620
Thence North 55-04-55 West, a distance of 865.4271
Thence North 37-47-48 West, a distance of 1333.2990
Thence North 31-20-45 West, a distance of 1101.0137
Thence North 44-35-54 West, a distance of 598.8896
Thence North 37-57-12 West, a distance of 682.2970
Thence North 41-51-15 West, a distance of 662.8068
Thence North 53-45-51 West, a distance of 494.8303
Thence North 45-42-20 West, a distance of 804.0414
Thence North 46-45-44 West, a distance of 1246.0249
Thence North 26-09-14 West, a distance of 249.2721
Thence North 17-13-52 West, a distance of 1029.1928
Thence North 16-05-57 West, a distance of 627.4825
Thence North 21-23-19 West, a distance of 960.3948
Thence North 10-53-51 West, a distance of 909.1444
Thence North 09-47-36 West, a distance of 1132.4407
Thence North 14-50-24 West, a distance of 1778.9616
Thence North 24-22-09 West, a distance of 638.3066
Thence North 18-48-47 West, a distance of 1015.1730
Thence North 21-07-46 West, a distance of 910.5965
Thence North 31-35-33 West, a distance of 630.8741
Thence North 27-28-23 West, a distance of 428.6517
Thence North 20-26-50 West, a distance of 500.9370
Thence North 33-29-10 West, a distance of 1188.9727
Thence South 90-00-00 East, a distance of 0.0000
to the point of beginning.
Perimeter: 115214.4657
Area: 308717524.7511 7087.1792 acres
3 2
4 5
29 31 32 33
34 10
28 6
20 28
21 MOUNTAIN AVE
SOBOBA RD
FAIRVIEW AVE
N SOBOBA ST
ESHAVER ST
CEDAR AVE
RAMONA EXWY
E ESPLANADE AVE
E MAIN ST
01 Miles
Exhibit D - Map of the Soboba Reservation
T.5.S R.1.E
T.4.S R.1.E
Exhibit E – Principles for Water Management
PRINCIPLES FOR WATER MANAGEMENT
1. Water Management Plan. These Principles, approved by the appropriate authority of each party, are intended to form the basis from which the parties will develop a Water Management Plan (“Management Plan”) for the area described in Section 2. The Management Plan is being developed to ensure an adequate and reliable source of future water supply.
The Management Plan is also intended to facilitate and accommodate a settlement of the claims of the Soboba Band of Luiseno Indians (“Soboba Tribe”).
2. Management Area. The area included in the Management Plan consists of the Canyon Sub-basin and the San Jacinto Upper Pressure Subbasin, downstream to Bridge Street, and the Hemet Basins (“Management Area”). The Management Area is shown upon the attached map.
3. Pumpers within the Management Area. The primary pumpers within the Management Area are: Eastern Municipal Water District (“Eastern”), Lake Hemet Municipal Water District (“Lake Hemet”), City of San Jacinto (“San Jacinto”), and City of Hemet (“Hemet”) (individually RVLIT\GT\654952.1 -1-
Exhibit E – Principles for Water Management
“Public Agency,” collectively “Public Agencies”); the Soboba Tribe (not a Management Plan participant); and approximately 62 individual agricultural and other private pumpers who pump more than 25 acre-feet per year (“Private Pumpers”).
4. Goals. The parties agree that the Management Plan shall incorporate and serve to implement the following goals:
A. Allowing for Future Urban Growth. The parties
acknowledge that the Management Area will continue to experience residential, commercial, and industrial growth and development, and that existing water production and service systems will need to be expanded to meet this growth. It is estimated that at least 15,000 afy incremental water supply capacity over the existing base production rights of the Public Agencies must be dedicated to adequately serve this growth. The Management Plan should serve and provide a clear planning process so that each affected Public Agency will be able to meet these projected growth needs.
RVLIT\GT\654952.1 -2-
Exhibit E – Principles for Water Management
B. Water Quality Protection. Implementation of the
Management Plan should protect and/or enhance Management Area water quality. However, implementation of certain elements of the Management Plan may cause limited localized water quality degradation. If such degradation impedes the then current beneficial use of any Public Agency in the Management Area, the Watermaster described in Section 22 (“Watermaster”) shall implement appropriate mitigation measures to ensure water supply to the affected Public Agency and bear the associated costs.
The standards for local water quality degradation shall be defined in the Management Plan.
C. Cost-Effective Management. The Management Plan
should serve to support the pursuit of cost-effective water supply and water treatment by the Public Agencies, both individually and collectively.
D. Overdraft. The groundwater levels within the
Management Area have generally been declining for a number of years, and the Management Area is presently in a condition of overdraft. It is recognized that the Management Plan will, within a reasonable period, eliminate groundwater overdraft and enhance operational yield by RVLIT\GT\654952.1 -3-
Exhibit E – Principles for Water Management
implementing a combination of available water resources management elements. These elements include: reduction in native groundwater production; enhanced recharge with native, imported and/or recycled water; development of supplemental supplies such as imported and recycled water; and water conservation programs.
E. Monitoring. The Watermaster shall implement a
monitoring program to ensure the Management Plan activities follow best management and engineering principles to protect Management Area water resources.
5. Public Agencies Base Production Rights.
A. The base production rights of Eastern, Lake Hemet and Hemet in the first year of the Management Plan shall be based upon their average production for calendar years 1995-1999. This period was chosen to reflect these Public Agencies’ recent pumping, and shall determine their base production rights.
RVLIT\GT\654952.1 -4-
Exhibit E – Principles for Water Management
B. The base production right of San Jacinto in the first year of the Management Plan, shall be based upon its average production for calendar years 1995-1999, plus 500 afy. The 500 afy is added because San Jacinto’s recent production does not reflect its historic production because of water purchases and other factors.
C. Pursuant to Section 21 below, for the life of the
Management Plan, Hemet and San Jacinto shall each add an additional 900 afy to their base production rights. The additional 900 afy shall not be subject to reduction by the Watermaster as provided in Section 5.D and shall not be subject to any Administrative or Replenishment Assessments as provided in Section 6, or other fee or charge imposed under the Management Plan.
D. It is the goal of the Management Plan to adjust base production rights over time to a level consistent with the Watermaster’s calculation of the Public Agencies' share of safe yield for the Management Area. Based on current information, it appears that the total reduction in base production rights will need to be approximately 35%. The ultimate reduction will be based on periodic demand, hydrology, recharge and RVLIT\GT\654952.1 -5-
Exhibit E – Principles for Water Management
availability of imported water. In order to implement this reduction in a phased manner, each Public Agency's base production rights shall be subject to adjustment as follows:
(1) A 10% reduction from the base production rights
in the first year of the Management Plan; and
(2) Until base production rights are consistent with the Public Agencies’ share of safe yield, Watermaster shall determine the reductions in base production rights in each subsequent year of the Management Plan, to achieve this goal within 6 years of approval of the Management Plan. Each reduction shall not be more than 10% of the base production right of the prior year.
(3) Pursuant to Section 7(A)(2)(b), upon conversion of
a Class B Participant's land from agricultural to a use that requires water service from a Public Agency, the Public Agency shall receive an increase in its base production rights equal to the adjusted base production right of the Class B Participant.
RVLIT\GT\654952.1 -6-
Exhibit E – Principles for Water Management
6. Public Agency Production Assessments. The Public Agency production will be subject to the following assessments:
A. An Administrative Assessment on each acre-foot pumped by a Public Agency up to its adjusted base production right. The parties contemplate that the Administrative Assessment will be $50.00 per acre-foot of water pumped in the first year of the Management Plan, and that such amount will thereafter be set by the Watermaster.
B. A Replenishment Assessment on each acre-foot pumped
by a Public Agency in excess of its adjusted base production right equal to the cost of providing a like quantity of supplemental water to recharge the Management Area, including recharge losses. Pumping by a Public Agency in excess of its adjusted base production right in order to meet increasing demands is expected and permissible, provided that such excess extractions shall be subject to the Replenishment Assessment. The costs of providing a like quantity of supplemental water shall include the costs of water, O&M costs of the replenishment system, capital recovery and other administrative costs. Currently, the total of these cost items is estimated to be in the range RVLIT\GT\654952.1 -7-
Exhibit E – Principles for Water Management
of $300 to $400 per acre-feet; the actual amount will reflect the costs at the time incurred.
7. Private Pumpers Water Rights. The Public Agencies recognize the overlying water rights of the Private Pumpers, and do not intend to take or adversely impact these rights without an agreement with the owner of such rights. The Management Plan will lay out alternatives for the retention, protection, or transfer of such rights, leaving selection of the alternative to the individual overlying water rights owner. A Private Pumper can elect not to participate in the Management Plan and not to formally acknowledge its existence. Such Pumpers shall be referred to herein as “Non-Participants”; such Pumpers shall continue to exercise whatever water rights they may hold under California law unaffected by the Management Plan. There is no intent to affect water use that is consistent with the historical use of the Private Pumpers. However, other pumpers under the Management Plan do not waive their rights to challenge new or expanded water rights. NonParticipants will not have the option of joining the program at a later date.
The alternatives available to participants are as follows:
RVLIT\GT\654952.1 -8-
Exhibit E – Principles for Water Management
A. (1) Class A Participation. A Private Pumper can elect to sign a written agreement acknowledging the existence of the Management Plan. Such Pumper shall be a Class A Participant and shall be entitled to vote for and/or be elected to serve as the Private Pumper representative on the Management Plan’s governing board or body described in Paragraph 22 below, but shall not otherwise be required to participate in the Management Plan implementation. A Class A Participant may, without any financial assessment by the Watermaster, pump from his/her/its property within the Management Area the amount of water that can be put to reasonable and beneficial use on the Pumper’s land as may be authorized under California law. Class A Participants shall have the right to convert to Class B Participation during a grace period that shall end three (3) years after the effective date of the Management Plan, as approved by a judgment of the Superior Court for Riverside County, upon payment of the total assessments the Pumper would have paid had the Pumper elected to be a member of Class B from the outset, plus interest.
(2) Class B Participation. A Private Pumper can
become a Class B Participant by electing to limit annual pumping to the Pumper’s average annual production during the calendar years 1995 through RVLIT\GT\654952.1 -9-
Exhibit E – Principles for Water Management
1999 and to pay replenishment assessments on amounts in excess of that average annual production. A Class B Participant shall enjoy the following benefits of Plan Participation:
a. Vote for and/or be elected to serve as the
Private Pumper’s representative on the Management Plan’s Governing Board;
b. Upon conversion of Pumper’s land from
agricultural use to a use that requires water service from a participating Public Agency, Public Agency shall credit to the extent legally permissible, Pumper or Pumper’s successor-in-interest’s adjusted production right, using the formula in Section 5 towards satisfaction of any requirement then in effect for water supply assessment requirements. Furthermore, Pumper or Pumper’s successor-in-interest shall be given a credit for Pumper’s adjusted production right using the formula in Section 5 towards any fees associated with water supply that the Public Agency may then have in effect. The Public Agency serving the converted land shall receive a credit to its production right as set forth in Section 5.
RVLIT\GT\654952.1 -10-
Exhibit E – Principles for Water Management
c. To the extent the Pumper’s land is not
covered under Section 7(A)(2)(b), Pumper will be eligible to enter into a contract with the Management Plan, or a participating Public Agency, to sell for a defined period of time some portion of Pumper’s adjusted production right, under terms and conditions mutually agreed upon by the Pumper and the Management Plan. Criteria used in consideration of such contract shall include:
(i) Management Plan’s need to acquire
additional water supplies to address Basin overdraft and recovery; (ii) Submission of a water conservation
plan, including use of in lieu water, by Pumper that will reasonably guarantee conservation of water that would otherwise be produced from the Basin;
(iii) Public policy considerations of local
government jurisdictions, including economic and land use impacts of proposed water conservation plan.
RVLIT\GT\654952.1 -11-
Exhibit E – Principles for Water Management
B. In-Lieu Water Use. In the event a Private Pumper (or successor) receives recycled and/or imported water from a Public Agency to serve an overlying use in place of groundwater, or otherwise engages in an in-lieu program, the overlying water right of the Private Pumper (or successor) shall not be diminished by the receipt and use of such recycled and/or imported water or by engaging in an in-lieu program.
C. Well Monitoring. To become a Class A or B Participant, a Private Pumper shall authorize the metering of the Pumper’s well(s) and the collection of groundwater level and quality data, and the reading thereof by Management Plan personnel. The metering and reading shall be at no cost to the Pumper, and the Pumper shall receive copies of the reports and information obtained upon request.
D. Future Production Participation. Any new Pumper after the effective date of the Management Plan, as approved by a judgment of the Superior Court for Riverside County, can only participate as a Class A Participant as described in Section 7A(1).
RVLIT\GT\654952.1 -12-
Exhibit E – Principles for Water Management
E. Replacement Wells. The redrilling of existing wells and the drilling of new wells to replace existing wells will not be considered new private production.
8. Capital Facilities. Each Public Agency shall continue to own its existing capital facilities for water management. However, capital facilities may be jointly constructed and owned by the Management Plan.
Joint financing of such facilities may be funded by regional capital fees, loans and grants, contributions for storage by The Metropolitan Water District of Southern California (“Metropolitan”) or other third-parties, and municipal bonds. Responsibility for the costs of any existing and future capital facility of the Management Plan should be apportioned among the Public Agencies based on relative benefit to be derived by each Public Agency. Any of the participating Public Agencies may propose projects to be included in the Management Plan to increase Management Area water supply. Such proposals, after evaluation by the Watermaster, shall be included or rejected. If the Watermaster chooses to reject the proposal, the proposing Public Agency may implement the rejected project as long as it does not significantly impact the implementation of the Management Plan and/or interfere with the ongoing production by the Public Agencies.
RVLIT\GT\654952.1 -13-
Exhibit E – Principles for Water Management
9. Soboba Tribe’s Water Rights. The Soboba Tribe’s water rights shall be determined as part of a settlement among the Soboba Tribe, the United States, Eastern, Lake Hemet and Metropolitan. Major points of the proposed settlement are:
A. The Soboba Tribe shall have a senior, prior right in the Canyon and San Jacinto Upper Pressure Sub-basins of 9000 afy, but its use shall be limited to a maximum of 4100 afy during the first 50 years after the effective date of the settlement.
B. The Soboba Tribe shall have the right to purchase
replenishment water for use pursuant to the Principles of Settlement at the Management Plan replenishment rate.
C. The Soboba settlement provides that, among other things, Metropolitan will use its best efforts to deliver sufficient water to yield a 15- year average of 7,500 afy to the Management Plan until 2035 at its longterm interruptible rate (currently $233/af).
RVLIT\GT\654952.1 -14-
Exhibit E – Principles for Water Management
D. Subject to full funding of the settlement by the United States, the Management Plan shall pay the Soboba Tribe $10 million.
E. The Management Plan will also pay the Soboba Tribe $7 million. A Public Agency's payment of its share of this amount is optional, but in order to obtain the benefits of the low-cost Metropolitan water delivered pursuant to the settlement, a Public Agency shall pay its share of this amount.
F. The Management Plan will receive $10 million for
capital improvements from the United States, and all unused Soboba Tribe water based on the Public Agency's participation in the payment in Section 9(E) above.
10. Implementation of These Principles. These Interim Principles for Water Management shall be used by the parties as a basis for the preparation of the Management Plan, and a stipulated judgment in a water rights adjudication. As explained below, the Management Plan shall be administered by the Watermaster. The Watermaster will be under the continuing jurisdiction of the Court.
RVLIT\GT\654952.1 -15-
Exhibit E – Principles for Water Management
11. Assessment Program. The assessment program contemplated by the Management Plan shall be administered by the Watermaster subject to the governance provisions herein. All payments shall be made to the Watermaster and shall be maintained in a separate restricted fund. All assessments shall be used exclusively to acquire imported, recycled or Metropolitan water for the recharge of the Management Area, and for the facilities and operational and administrative expenses associated with the assessment and recharge programs. Subject to Management Plan approval, assessments may also be used by affected parties to acquire and deliver water for direct use by the parties, in lieu of pumping.
12. Replenishment Program. The replenishment program
contemplated by the Management Plan shall also be administered by the Watermaster. The program shall include: the acquisition of supplemental water supplies (including imported, recycled and Soboba Tribe water); the expenditure of assessments; the recharge of the Management Area; and the construction and operation of all necessary facilities, including but not limited to, development of surface and sub-surface percolation and injection facilities. Priority for replenishment will be based on an equitable RVLIT\GT\654952.1 -16-
Exhibit E – Principles for Water Management
apportionment of available replenishment water among the sub-basins after full consideration of: the Public Agency's participation in the payment in Section 9(E) above; the Management Area conditions; water demands; the availability of storage capacity to accommodate the recharge of natural flows; the availability of appropriate conveyance facilities; and the availability of replenishment or imported water. The Watermaster is encouraged to take advantage of surplus imported water that occasionally may be available at low cost, and to use available assessment funds to bank such recharge against future pumping in excess of adjusted production rights.
13. Rights to Groundwater. Groundwater in the Management Area may occur from: natural recharge; spreading operations of natural flows; replenishment with imported, recycled or Metropolitan water acquired with assessment funds; or in-lieu recharge programs financed with assessment funds. All such groundwater shall be available to support the pumping of the parties as allowed herein, and shall not be the property of any individual party, subject to the provisions of Section 14.
RVLIT\GT\654952.1 -17-
Exhibit E – Principles for Water Management
14. Storage Rights. The parties recognize that unused storage capacity exists in the Management Area, and the Management Plan contemplates that this capacity will be managed conjunctively with available imported and recycled water supplies. Subject to availability of the Management Plan fund for assessments and unused storage capacity as determined by Watermaster, the Management Area will be recharged and water stored therein when such supplies are available, and drawn upon by the Public Agencies in dry years when such supplemental water supplies may not be available. In addition, unused storage capacity as determined by Watermaster may be used for “put and take” operations of recycled or imported water that is paid for by any party to the Management Plan provided that:
A. Such operations do not interfere with the rights of any other pumper, or with the use of the storage capacity for recharge and storage under the Management Plan;
B. Water available for recharge is purchased first, as
needed, for the Management Plan;
RVLIT\GT\654952.1 -18-
Exhibit E – Principles for Water Management
C. Later recovery of stored water shall exclude losses; and D. Such recovered water may be used anywhere within the service area of the party.
Any conjunctive use programs for the benefit of territory outside of the Management Area shall be subject to the governance provisions herein. Any storage, conjunctive use programs by third parties or in-lieu recharge programs financed with assessment funds shall be subject to the governance provisions herein.
15. Spreading Operations. The Public Agencies shall
independently or jointly operate their respective facilities to maximize the existing spreading and recharge operations of natural flow in the Management Area.
16. Recharge Water Quality. Consistent with Section 4(E) above all water used to replenish any sub-basin in the Management Area shall meet the Regional Water Quality Control Board requirements, and may be used in any sub-basin where such requirements are met.
RVLIT\GT\654952.1 -19-
Exhibit E – Principles for Water Management
17. Recharge Losses. The accounting for storage recharge of the Management Area shall not include any water that escapes therefrom and migrates downstream beyond the Management Area. Losses will be calculated based upon best engineering principles.
18. Recycled Water. The use of recycled water can be of substantial benefit in providing additional water in the Management Area.
Each Public Agency may implement a recycled water program, including the ownership, operation and construction of all necessary facilities, and the application for and administration of any loan or grant applications. The Management Plan will support loan or grant applications, and the Public Agencies will work to integrate recycled water into the Management Plan to the extent economically feasible while meeting regulatory standards.
Subject to existing recycled water contracts, the Management Plan will have a first right of refusal to purchase excess recycled water for recharge.
Priority shall be given to Management Area recharge for the use of recycled water which originates therefrom.
19. Export. The Public Agencies may export water outside the Management Area, on a temporary basis, upon approval by the Watermaster.
RVLIT\GT\654952.1 -20-
Exhibit E – Principles for Water Management
However, any water exported shall be replenished with an appropriate amount of similar or better quality water as determined by Watermaster.
Also, water exports by the Public Agencies shall not interfere with the Management Plan or any other Public Agency's operations. The Management Plan will set forth the specific criteria for the export of water, including, but not limited to, conjunctive use programs.
20. Credits. Recharge credits documented before the Management Plan shall be calculated pursuant to the Management Plan. Future recharge credits shall be established by replenishment of water or by not exercising the full, adjusted base production right, and shall be calculated pursuant to the Management Plan.
21. Tunnel Seepage, Stream Diversions, Fruitvale To resolve Eastern’s use of Tunnel seepage, Lake Hemet’s stream diversions and Eastern’s use of Fruitvale water, 900 afy shall be added to Hemet’s adjusted base production and 900 afy shall be added to San Jacinto’s adjusted base production right as discussed in Section 5 above. This is intended to provide Hemet and San Jacinto a fair share of water from these disputed issues.
RVLIT\GT\654952.1 -21-
Exhibit E – Principles for Water Management
22. Governance. The Management Plan will be administered by a Watermaster as follows:
A. The governing board of the Watermaster shall consist of one elected official from each of the Public Agencies and one Private Pumper representative selected by the Private Pumpers who participate in the Management Plan. Each member shall have one vote.
B. The Watermaster’s duties shall include: determining safe yield; determining replenishment needs; determining annual adjusted base production rights; purchasing and selling imported and recycled water; constructing future capital facilities; establishing assessment rates; initiating necessary conservation and drought management measures; and implementing other responsibilities identified in the Management Plan documents.
Dated: ______, 2004. EASTERN MUNICIPAL WATER
DISTRICT
By: ___________________________
RVLIT\GT\654952.1 -22-
Exhibit E – Principles for Water Management
Dated: ______, 2004. LAKE HEMET MUNICIPAL WATER
DISTRICT
By: ___________________________
Dated: ______, 2004. CITY OF HEMET
By: ___________________________
Dated: ______, 2004. CITY OF SAN JACINTO
By: ___________________________
RVLIT\GT\654952.1 -23-
DIAMOND VALLEY LAKE
RAMONA EXPWY
HWY 79
HWY 74
HWY
79 STATE ST.
DOMENIGONI PKWY
HWY 74
2 1
11 12
3 2 1 6 5 4
7 8
9 10 11 12
6 5
7 8
3 2 1 6 5 4
7 8
9 10 11 12
13 18 17 16 15 14
19 20 21 22 23 24
29 28 27 26 25 30
31 32 33 34 35 36
1 3 2 6 5 4
7 8 9 10 11 12
18 17 16 15 14 13
19 20 21 22 23 24
29 28 27 26 25 30
31 32 33 34 35 36
2 1
11 12
14 13
23 24
26 25
35 36
2 1
11 12
13 14
23 24
26 25
35 36
6 5 4
7 8 9 10 11 12
17 16 15 14 13
18 19 20 21 23 24
29 28 27 26 25 30
31 32 33 34 35
18 19
20 21 22
30 29 28 27
31 32 33 34
31 32 35 36 33
22 36
18 17
19 20
30 29
CANYON
SUBBASIN
INTAKE
SUBBASIN
UPPER PRESSURE
HEMET NORTH
SUBBASIN
HEMET SOUTH
SUBBASIN
NOTE:
UPPER PRESSURE INCLUDES
INTAKE SUBBASIN
NORTH
1”=9,000’
06-02-2004
T.5S. R.1W.
T.4S. R.1W.
T.5S. R.2W.
T.4S. R.2W.
Exhibit F
Map of the Water Management Plan Area
0 9,000’ 18,000’
Exhibit G – Description of the Water Management Plan Area Water Management Plan Area
Beginning at the North quarter Corner of Section 2, Township 4 South, Range 2 West, S.B.B.& M.:
Thence South 55-09-46 West, a distance of 3086.02
to the True Point of Beginning;
Thence South 01-57-57 West, a distance of 3159.1491
Thence South 00-29-02 West, a distance of 429.3273
Thence South 00-14-26 West, a distance of 1908.6588
Thence South 01-46-37 West, a distance of 1567.6119
Thence North 55-21-31 East, a distance of 446.8379
Thence North 26-23-15 East, a distance of 631.4127
Thence South 87-18-21 East, a distance of 191.4616
Thence South 87-17-52 East, a distance of 446.7468
Thence South 70-03-12 East, a distance of 419.5431
Thence South 48-59-17 East, a distance of 352.6834
Thence South 49-46-27 East, a distance of 298.9505
Thence South 38-14-56 East, a distance of 408.2682
Thence South 43-41-06 East, a distance of 568.0886
Thence South 33-24-04 East, a distance of 907.5881
Thence South 39-40-04 East, a distance of 681.4619
Thence South 44-35-36 East, a distance of 523.0954
Thence South 40-05-37 East, a distance of 805.0741
Thence South 37-55-01 East, a distance of 359.8351
Thence South 35-20-31 East, a distance of 531.5890
Thence South 22-00-05 East, a distance of 405.3986
Thence South 17-22-41 East, a distance of 504.7266
Thence South 25-17-32 East, a distance of 595.1082
Thence South 32-14-23 East, a distance of 575.2528
Thence South 38-11-56 East, a distance of 414.9866
Thence South 21-26-59 East, a distance of 691.8554
Thence South 22-44-15 East, a distance of 524.2415
Thence South 20-38-45 East, a distance of 573.2541
Thence South 32-15-39 East, a distance of 191.7948
Thence South 88-14-08 East, a distance of 156.3241
Thence South 46-34-05 East, a distance of 439.2778
Thence South 12-36-58 East, a distance of 409.7686
Thence South 18-19-44 East, a distance of 426.9082
Thence South 16-24-51 East, a distance of 572.8471
Thence South 22-07-10 East, a distance of 731.9991
Thence South 22-31-31 East, a distance of 720.1255
Thence South 22-41-43 East, a distance of 1039.9629
Thence South 38-30-56 East, a distance of 426.1504
Thence South 37-08-43 East, a distance of 350.8795
Thence South 35-21-27 East, a distance of 265.6921
Thence South 00-21-06 West, a distance of 692.3260
Thence South 09-53-35 East, a distance of 427.7983
Thence South 14-00-56 East, a distance of 460.9092
Thence South 00-49-47 East, a distance of 353.9741
Thence South 39-14-44 West, a distance of 334.1122
Thence North 88-16-13 West, a distance of 312.6425
Thence North 88-15-40 West, a distance of 327.5258
Exhibit G – Description of the Water Management Plan Area Thence South 65-20-48 West, a distance of 211.1187
Thence South 51-19-16 West, a distance of 262.9182
Thence North 81-25-48 West, a distance of 270.5204
Thence North 00-23-36 East, a distance of 254.9440
Thence North 14-20-10 West, a distance of 196.8810
Thence North 69-38-37 West, a distance of 331.8501
Thence North 88-16-15 West, a distance of 312.7674
Thence South 45-39-54 West, a distance of 220.8974
Thence South 00-40-33 West, a distance of 158.9491
Thence South 08-40-14 West, a distance of 373.9607
Thence South 18-56-44 West, a distance of 166.3231
Thence South 13-04-14 East, a distance of 219.4350
Thence South 88-17-54 East, a distance of 208.3419
Thence South 52-36-50 East, a distance of 454.9685
Thence South 57-10-41 East, a distance of 307.7555
Thence South 10-23-15 East, a distance of 271.0676
Thence South 47-38-04 East, a distance of 488.4199
Thence South 38-59-11 East, a distance of 489.7587
Thence South 43-18-04 East, a distance of 225.0918
Thence South 36-19-43 East, a distance of 1211.7791
Thence South 00-40-32 West, a distance of 159.0111
Thence South 15-40-02 East, a distance of 555.4493
Thence South 32-13-48 East, a distance of 383.6829
Thence South 34-03-33 East, a distance of 457.3251
Thence South 06-55-29 West, a distance of 478.9941
Thence South 11-48-53 West, a distance of 538.4695
Thence South 04-00-47 East, a distance of 639.4428
Thence South 57-16-59 West, a distance of 374.5463
Thence South 59-59-38 West, a distance of 302.6944
Thence South 45-44-02 West, a distance of 220.8122
Thence South 40-23-23 West, a distance of 407.4181
Thence South 27-02-10 West, a distance of 234.5719
Thence South 18-54-48 West, a distance of 499.3999
Thence South 18-54-28 West, a distance of 332.9008
Thence South 08-40-29 West, a distance of 373.7759
Thence South 11-49-45 West, a distance of 538.4344
Thence South 00-40-31 West, a distance of 318.1471
Thence South 00-39-43 West, a distance of 530.0974
Thence South 30-14-06 West, a distance of 422.2534
Thence South 31-26-41 West, a distance of 305.2671
Thence South 77-24-27 West, a distance of 214.1513
Thence North 25-17-38 West, a distance of 238.1444
Thence South 35-31-17 West, a distance of 637.9021
Thence South 39-15-19 West, a distance of 169.0961
Thence South 39-13-20 West, a distance of 165.0641
Thence South 39-14-20 West, a distance of 668.3212
Thence South 30-15-45 West, a distance of 422.1539
Thence South 06-16-29 West, a distance of 531.8110
Thence South 18-55-03 West, a distance of 166.5596
Thence South 21-01-01 West, a distance of 449.2623
Thence South 27-03-08 West, a distance of 351.8017
Thence South 31-28-15 West, a distance of 305.2794
Thence South 45-41-33 West, a distance of 515.4747
Thence South 77-23-51 West, a distance of 642.2232
Thence South 85-54-45 West, a distance of 522.5793
Thence North 82-59-20 West, a distance of 576.5611
Exhibit G – Description of the Water Management Plan Area Thence North 64-53-25 West, a distance of 400.6090
Thence North 66-16-35 West, a distance of 566.0858
Thence North 38-59-11 West, a distance of 489.7595
Thence North 32-14-03 West, a distance of 383.4039
Thence North 20-39-20 West, a distance of 286.6781
Thence North 43-18-43 West, a distance of 225.0460
Thence South 18-53-52 West, a distance of 166.3412
Thence North 88-17-24 West, a distance of 416.8106
Thence South 04-55-55 East, a distance of 533.6007
Thence South 51-18-38 East, a distance of 264.5584
Thence South 16-03-15 East, a distance of 723.6602
Thence South 34-10-30 West, a distance of 188.4831
Thence South 37-27-05 West, a distance of 261.0635
Thence South 06-18-55 East, a distance of 428.4127
Thence South 00-40-32 West, a distance of 371.0878
Thence South 66-17-12 East, a distance of 283.1573
Thence South 54-26-34 East, a distance of 380.8999
Thence South 18-53-51 West, a distance of 499.4190
Thence South 32-15-38 East, a distance of 191.7957
Thence South 14-32-01 West, a distance of 434.8520
Thence South 17-11-06 West, a distance of 549.9921
Thence South 31-27-03 West, a distance of 305.2142
Thence South 60-02-12 West, a distance of 302.7087
Thence South 60-45-52 West, a distance of 721.1047
Thence South 83-27-27 West, a distance of 367.5184
Thence South 57-14-27 West, a distance of 374.5758
Thence South 20-39-20 East, a distance of 286.6781
Thence South 88-16-51 East, a distance of 312.5156
Thence South 25-17-24 East, a distance of 476.0654
Thence South 57-08-56 East, a distance of 307.8569
Thence North 50-10-17 East, a distance of 479.5142
Thence North 29-05-00 East, a distance of 656.5286
Thence South 34-02-30 East, a distance of 457.5323
Thence South 17-22-42 East, a distance of 168.2415
Thence South 00-40-33 West, a distance of 158.9491
Thence South 60-02-12 West, a distance of 302.7087
Thence South 00-40-31 West, a distance of 371.2758
Thence South 67-32-00 East, a distance of 448.9489
Thence South 64-52-57 East, a distance of 400.4958
Thence North 71-51-49 East, a distance of 481.6809
Thence South 89-35-03 East, a distance of 344.3841
Thence South 46-25-17 East, a distance of 279.7030
Thence South 03-10-14 East, a distance of 409.0632
Thence South 23-51-22 West, a distance of 416.9340
Thence South 03-24-06 East, a distance of 383.4255
Thence South 66-09-28 East, a distance of 498.9547
Thence North 61-17-01 East, a distance of 418.4674
Thence North 62-31-22 East, a distance of 424.9349
Thence South 60-02-46 East, a distance of 439.7373
Thence South 24-58-10 East, a distance of 414.5596
Thence South 33-07-02 East, a distance of 260.1327
Thence South 34-34-28 East, a distance of 318.9559
Thence South 18-21-02 East, a distance of 308.8960
Thence South 13-34-41 West, a distance of 413.1727
Thence South 42-19-37 West, a distance of 343.9836
Thence South 63-55-07 West, a distance of 198.5981
Exhibit G – Description of the Water Management Plan Area Thence North 85-31-13 West, a distance of 366.4946
Thence North 76-58-32 West, a distance of 406.8413
Thence North 72-11-08 West, a distance of 279.2651
Thence South 48-26-06 West, a distance of 204.3228
Thence South 34-26-55 West, a distance of 484.3828
Thence South 07-01-37 West, a distance of 389.2991
Thence South 05-32-54 East, a distance of 480.9402
Thence South 47-03-44 East, a distance of 682.8003
Thence South 21-46-09 East, a distance of 371.7621
Thence South 02-53-33 East, a distance of 483.0534
Thence South 14-20-24 West, a distance of 531.9487
Thence South 35-28-25 West, a distance of 663.8471
Thence South 52-23-59 West, a distance of 364.7668
Thence South 08-13-01 East, a distance of 698.7991
Thence South 67-31-20 East, a distance of 449.3910
Thence South 25-24-05 East, a distance of 238.0781
Thence South 22-14-37 West, a distance of 282.6599
Thence South 22-16-19 West, a distance of 282.6499
Thence South 26-41-31 East, a distance of 328.3674
Thence South 08-00-01 East, a distance of 374.5201
Thence South 00-14-32 West, a distance of 295.8146
Thence South 22-50-30 East, a distance of 524.2347
Thence South 32-19-47 East, a distance of 135.8012
Thence South 74-41-41 East, a distance of 495.5765
Thence North 87-48-16 East, a distance of 230.0439
Thence South 62-02-24 East, a distance of 271.0081
Thence South 27-01-09 East, a distance of 158.7654
Thence South 00-25-08 West, a distance of 188.1300
Thence South 47-28-36 West, a distance of 306.8174
Thence South 67-08-04 West, a distance of 1017.9951
Thence South 88-16-15 West, a distance of 559.2547
Thence North 38-00-54 West, a distance of 199.5152
Thence North 01-24-06 West, a distance of 209.4997
Thence North 29-50-03 West, a distance of 268.0941
Thence North 58-00-46 West, a distance of 880.2816
Thence North 18-49-54 East, a distance of 131.2772
Thence North 41-46-48 East, a distance of 881.2088
Thence North 53-22-34 East, a distance of 244.5273
Thence North 12-17-03 East, a distance of 196.8192
Thence North 32-10-09 West, a distance of 185.4739
Thence North 63-33-01 West, a distance of 250.0488
Thence North 87-33-20 West, a distance of 561.2607
Thence North 66-33-29 West, a distance of 616.6454
Thence North 08-43-43 East, a distance of 216.6340
Thence North 67-39-56 East, a distance of 702.4460
Thence North 35-11-58 East, a distance of 228.9973
Thence North 05-39-39 West, a distance of 221.7695
Thence North 52-37-23 West, a distance of 454.7550
Thence North 70-59-03 West, a distance of 713.5651
Thence North 88-13-32 West, a distance of 260.3749
Thence North 81-50-24 West, a distance of 472.9131
Thence North 46-37-10 West, a distance of 638.0651
Thence North 43-16-43 West, a distance of 300.1255
Thence North 38-12-54 West, a distance of 414.8389
Thence North 17-22-30 West, a distance of 336.5442
Thence North 15-44-09 East, a distance of 601.0252
Exhibit G – Description of the Water Management Plan Area Thence North 17-21-42 West, a distance of 673.1694
Thence North 20-38-46 West, a distance of 573.2531
Thence North 18-52-30 West, a distance of 622.8685
Thence South 60-02-48 West, a distance of 302.6778
Thence North 69-38-36 West, a distance of 331.8504
Thence South 60-02-48 West, a distance of 302.6778
Thence North 43-18-30 West, a distance of 675.1831
Thence North 32-14-42 West, a distance of 383.5238
Thence North 57-09-25 West, a distance of 615.5074
Thence South 80-11-19 West, a distance of 529.6212
Thence South 86-26-44 West, a distance of 574.6054
Thence North 35-20-05 West, a distance of 531.4653
Thence North 00-38-55 East, a distance of 265.0170
Thence North 67-31-12 West, a distance of 448.8571
Thence South 88-18-10 West, a distance of 886.2638
Thence South 60-46-39 West, a distance of 721.0129
Thence South 45-41-01 West, a distance of 589.1057
Thence South 14-55-27 East, a distance of 387.3153
Thence South 00-40-32 West, a distance of 371.0888
Thence South 13-04-27 East, a distance of 438.7482
Thence South 21-26-38 East, a distance of 692.0304
Thence South 46-37-24 East, a distance of 638.0219
Thence South 47-03-19 East, a distance of 563.1754
Thence South 14-56-23 East, a distance of 387.4074
Thence South 23-12-42 East, a distance of 643.1882
Thence South 28-23-55 East, a distance of 428.9302
Thence South 14-56-32 East, a distance of 387.3475
Thence South 08-36-11 East, a distance of 323.3886
Thence South 04-55-55 East, a distance of 533.6007
Thence South 13-03-12 East, a distance of 205.8819
Thence South 09-36-40 East, a distance of 902.1630
Thence South 33-16-14 East, a distance of 321.9605
Thence South 36-27-41 West, a distance of 173.5290
Thence South 58-28-58 West, a distance of 639.1622
Thence South 01-42-32 East, a distance of 8216.1537
Thence North 78-59-47 East, a distance of 87.1013
Thence South 88-12-52 East, a distance of 469.3529
Thence South 74-02-23 East, a distance of 432.5486
Thence South 69-39-25 East, a distance of 664.8422
Thence South 88-10-48 East, a distance of 208.6052
Thence South 69-38-45 East, a distance of 498.6348
Thence South 82-26-13 East, a distance of 525.1939
Thence North 80-15-12 East, a distance of 265.0761
Thence South 69-37-59 East, a distance of 332.4062
Thence North 80-15-12 East, a distance of 265.0761
Thence North 61-21-31 East, a distance of 418.1679
Thence North 78-16-23 East, a distance of 907.4410
Thence South 79-58-51 East, a distance of 370.0179
Thence North 82-08-20 East, a distance of 316.2216
Thence North 55-40-58 East, a distance of 239.1251
Thence North 32-41-32 East, a distance of 260.8180
Thence North 87-54-28 East, a distance of 267.0530
Thence South 74-39-09 East, a distance of 360.3507
Thence South 81-59-59 East, a distance of 351.1678
Thence South 85-51-12 East, a distance of 535.0256
Thence North 74-27-22 East, a distance of 253.5225
Exhibit G – Description of the Water Management Plan Area Thence North 68-04-45 East, a distance of 405.9771
Thence North 72-57-30 East, a distance of 164.2103
Thence North 68-40-29 East, a distance of 674.5618
Thence South 88-12-52 East, a distance of 469.3529
Thence North 84-02-19 East, a distance of 787.1317
Thence North 57-20-59 East, a distance of 187.2075
Thence North 72-57-06 East, a distance of 328.3010
Thence North 89-27-22 East, a distance of 1303.8087
Thence North 69-30-36 East, a distance of 279.4284
Thence North 55-24-17 East, a distance of 446.5897
Thence North 77-27-37 East, a distance of 428.3428
Thence North 57-20-59 East, a distance of 187.2075
Thence North 68-40-15 East, a distance of 674.4450
Thence North 54-02-04 East, a distance of 259.7702
Thence North 61-32-05 West, a distance of 236.0350
Thence North 11-48-13 East, a distance of 268.8725
Thence North 74-44-23 East, a distance of 542.1152
Thence North 79-01-23 East, a distance of 478.8868
Thence North 72-58-07 East, a distance of 328.4024
Thence North 39-15-47 East, a distance of 333.7907
Thence North 18-52-51 East, a distance of 332.5833
Thence North 77-29-05 East, a distance of 428.3020
Thence South 64-07-57 East, a distance of 518.8621
Thence South 88-12-19 East, a distance of 365.1791
Thence North 57-18-33 East, a distance of 748.5774
Thence North 30-13-53 East, a distance of 421.8035
Thence North 50-13-44 East, a distance of 479.1141
Thence North 27-01-48 East, a distance of 351.2419
Thence North 69-48-55 East, a distance of 347.5974
Thence North 73-52-54 East, a distance of 276.2335
Thence North 64-10-01 East, a distance of 564.5414
Thence North 48-25-39 East, a distance of 770.2680
Thence North 02-42-04 West, a distance of 363.4037
Thence North 07-15-13 East, a distance of 494.0156
Thence South 82-00-37 East, a distance of 544.5357
Thence North 23-34-36 East, a distance of 248.7655
Thence North 08-21-28 West, a distance of 257.9899
Thence North 12-57-56 West, a distance of 211.7095
Thence North 39-05-14 East, a distance of 188.3414
Thence South 59-36-44 East, a distance of 294.3064
Thence South 29-40-15 East, a distance of 384.3301
Thence North 77-27-50 East, a distance of 214.2324
Thence South 37-11-16 East, a distance of 340.4048
Thence South 29-37-50 East, a distance of 310.4751
Thence North 63-11-55 East, a distance of 298.2940
Thence North 54-27-48 East, a distance of 484.6434
Thence North 53-19-04 East, a distance of 504.0777
Thence North 70-16-43 East, a distance of 313.3817
Thence North 68-19-13 East, a distance of 338.7091
Thence South 79-55-46 East, a distance of 321.3256
Thence South 88-11-10 East, a distance of 260.6306
Thence South 88-14-05 East, a distance of 365.1733
Thence South 61-32-01 East, a distance of 235.8955
Thence South 69-37-59 East, a distance of 332.4058
Thence South 71-22-52 East, a distance of 548.3222
Thence South 13-09-09 East, a distance of 219.1868
Exhibit G – Description of the Water Management Plan Area Thence South 22-05-36 East, a distance of 405.4599
Thence South 35-25-24 East, a distance of 265.9093
Thence South 61-31-13 East, a distance of 235.9251
Thence North 09-57-27 East, a distance of 320.9599
Thence North 12-08-01 West, a distance of 709.4744
Thence North 05-00-10 West, a distance of 533.2184
Thence North 31-28-03 East, a distance of 304.8291
Thence North 62-04-26 East, a distance of 534.2079
Thence North 76-04-08 East, a distance of 380.0540
Thence North 50-36-14 East, a distance of 898.3854
Thence South 60-30-43 East, a distance of 295.9651
Thence South 09-03-18 East, a distance of 874.4608
Thence South 42-03-39 West, a distance of 1049.7552
Thence South 33-04-47 East, a distance of 305.9692
Thence South 00-25-20 West, a distance of 424.0115
Thence South 08-41-25 West, a distance of 175.3885
Thence South 18-57-27 West, a distance of 88.8830
Thence South 00-37-56 West, a distance of 158.5727
Thence South 02-24-11 West, a distance of 420.3696
Thence South 10-51-56 West, a distance of 218.1612
Thence South 23-17-39 West, a distance of 1081.6711
Thence South 22-14-55 West, a distance of 282.6016
Thence South 09-56-34 West, a distance of 642.1445
Thence South 00-36-30 West, a distance of 423.7739
Thence South 05-36-43 East, a distance of 480.6166
Thence South 34-07-27 East, a distance of 457.6755
Thence South 43-22-35 East, a distance of 525.6352
Thence South 43-21-59 East, a distance of 468.2066
Thence South 86-51-47 East, a distance of 194.1659
Thence North 13-02-05 West, a distance of 207.2779
Thence North 31-29-15 East, a distance of 304.8943
Thence South 28-28-33 East, a distance of 429.1724
Thence South 00-37-56 West, a distance of 101.9432
Thence South 00-34-18 West, a distance of 162.8831
Thence South 79-04-14 West, a distance of 215.9165
Thence South 16-16-25 East, a distance of 365.7800
Thence South 29-40-24 East, a distance of 310.3196
Thence South 00-36-30 West, a distance of 211.8869
Thence South 11-46-39 West, a distance of 268.8469
Thence South 34-06-24 East, a distance of 457.6575
Thence South 32-18-47 East, a distance of 383.7376
Thence South 05-00-57 East, a distance of 533.2921
Thence South 18-52-51 West, a distance of 332.5833
Thence South 34-14-57 West, a distance of 564.8157
Thence South 62-30-45 West, a distance of 350.7168
Thence South 27-53-02 East, a distance of 1292.0070
Thence South 26-38-27 East, a distance of 844.3959
Thence South 35-16-45 East, a distance of 1398.9888
Thence South 43-11-11 East, a distance of 1392.1514
Thence South 42-14-40 East, a distance of 491.7866
Thence North 45-24-07 East, a distance of 151.1478
Thence South 77-29-31 East, a distance of 410.3647
Thence South 18-02-51 East, a distance of 181.1631
Thence South 39-21-33 East, a distance of 223.9113
Thence South 33-18-20 East, a distance of 206.6998
Thence South 00-25-39 West, a distance of 167.5677
Exhibit G – Description of the Water Management Plan Area Thence South 54-42-30 East, a distance of 111.6424
Thence South 50-39-25 East, a distance of 838.8686
Thence North 11-47-14 West, a distance of 130.9483
Thence North 07-43-40 West, a distance of 202.6535
Thence North 00-24-22 East, a distance of 229.3178
Thence North 00-25-00 East, a distance of 171.8795
Thence North 37-17-40 East, a distance of 143.3793
Thence South 83-52-17 East, a distance of 288.0212
Thence South 35-07-26 East, a distance of 246.5899
Thence South 57-35-35 East, a distance of 270.2065
Thence South 66-24-50 East, a distance of 218.3676
Thence South 84-22-46 East, a distance of 316.5217
Thence South 67-45-17 East, a distance of 154.3641
Thence South 60-13-50 East, a distance of 526.0466
Thence South 30-34-27 East, a distance of 334.2156
Thence South 20-07-23 East, a distance of 244.8868
Thence South 21-23-16 East, a distance of 463.0777
Thence South 26-09-54 East, a distance of 192.1947
Thence South 37-28-06 East, a distance of 326.7182
Thence South 31-11-18 East, a distance of 437.6249
Thence South 36-28-24 East, a distance of 429.8103
Thence South 32-03-48 East, a distance of 373.6888
Thence South 38-14-10 East, a distance of 366.9793
Thence South 26-09-29 East, a distance of 448.5666
Thence South 26-08-48 East, a distance of 256.4284
Thence South 28-11-19 East, a distance of 359.0890
Thence South 27-53-11 East, a distance of 423.0643
Thence South 28-12-22 East, a distance of 359.1480
Thence South 32-03-30 East, a distance of 373.7422
Thence South 44-37-29 East, a distance of 80.9655
Thence North 18-52-20 East, a distance of 181.2433
Thence North 00-24-01 East, a distance of 143.1905
Thence North 14-50-58 West, a distance of 326.7890
Thence North 05-18-17 West, a distance of 287.9834
Thence North 00-24-59 East, a distance of 258.0698
Thence North 53-33-00 East, a distance of 143.2788
Thence North 84-41-51 East, a distance of 288.1079
Thence South 51-43-06 East, a distance of 326.7620
Thence South 44-34-21 East, a distance of 527.0298
Thence South 31-11-28 East, a distance of 437.3463
Thence South 33-58-56 East, a distance of 659.7382
Thence South 38-14-14 East, a distance of 550.5564
Thence South 63-00-06 East, a distance of 384.5311
Thence South 38-59-18 East, a distance of 1038.4843
Thence South 15-17-56 East, a distance of 952.6996
Thence South 55-56-23 East, a distance of 206.5605
Thence South 55-53-00 East, a distance of 516.8216
Thence South 38-53-16 East, a distance of 407.1779
Thence South 16-56-09 East, a distance of 1441.3852
Thence South 07-11-08 East, a distance of 433.7182
Thence South 21-02-16 East, a distance of 862.1560
Thence South 27-40-23 East, a distance of 487.1621
Thence South 26-09-29 East, a distance of 448.5666
Thence South 45-22-28 West, a distance of 81.1422
Thence South 06-42-29 East, a distance of 231.1453
Thence South 20-08-17 East, a distance of 244.7103
Exhibit G – Description of the Water Management Plan Area Thence South 09-04-03 East, a distance of 174.4926
Thence South 09-02-24 East, a distance of 174.2271
Thence South 07-43-40 East, a distance of 202.6525
Thence South 00-24-00 West, a distance of 286.5700
Thence South 14-49-32 East, a distance of 326.8170
Thence South 00-24-00 West, a distance of 286.5070
Thence South 21-21-44 East, a distance of 154.4223
Thence South 13-37-15 East, a distance of 236.2051
Thence South 13-38-35 East, a distance of 236.3570
Thence South 15-31-50 East, a distance of 208.6814
Thence South 22-46-58 East, a distance of 218.2129
Thence South 22-46-35 East, a distance of 218.2700
Thence South 55-52-57 East, a distance of 206.7006
Thence South 78-16-53 East, a distance of 146.1716
Thence North 79-05-28 East, a distance of 292.2816
Thence North 74-28-54 East, a distance of 208.6048
Thence North 82-16-12 East, a distance of 202.5910
Thence South 89-35-39 East, a distance of 229.3808
Thence South 80-06-19 East, a distance of 174.2164
Thence North 22-12-54 East, a distance of 154.3976
Thence North 26-07-54 West, a distance of 192.1396
Thence North 36-27-45 West, a distance of 286.6826
Thence North 41-34-35 West, a distance of 385.5748
Thence North 26-08-54 West, a distance of 384.3343
Thence North 13-37-11 West, a distance of 354.5964
Thence North 24-22-44 West, a distance of 410.3376
Thence North 18-00-48 West, a distance of 362.5852
Thence North 12-07-44 West, a distance of 264.1464
Thence North 05-55-46 West, a distance of 519.0893
Thence North 00-24-59 East, a distance of 429.9494
Thence North 02-18-24 West, a distance of 602.4882
Thence North 02-04-24 West, a distance of 659.9320
Thence North 02-05-06 West, a distance of 659.6867
Thence North 25-08-41 West, a distance of 730.7479
Thence North 42-06-19 West, a distance of 466.4456
Thence North 19-15-13 West, a distance of 426.0813
Thence North 02-57-04 West, a distance of 488.0222
Thence North 00-24-41 East, a distance of 487.3876
Thence North 00-25-30 East, a distance of 286.5709
Thence North 19-34-09 West, a distance of 335.5043
Thence North 34-05-50 West, a distance of 556.3259
Thence North 22-12-56 West, a distance of 745.1916
Thence North 23-12-25 West, a distance of 500.5652
Thence North 06-43-37 West, a distance of 462.0560
Thence North 10-53-48 West, a distance of 292.2697
Thence North 00-25-22 East, a distance of 372.6971
Thence North 00-24-28 East, a distance of 544.3888
Thence North 00-24-21 East, a distance of 458.6995
Thence North 13-37-02 West, a distance of 472.5327
Thence North 16-18-14 West, a distance of 299.2196
Thence North 06-09-17 East, a distance of 287.9729
Thence North 63-49-21 East, a distance of 256.2870
Thence North 63-49-04 East, a distance of 192.3620
Thence South 89-35-15 East, a distance of 286.5074
Thence South 72-52-12 East, a distance of 299.4071
Thence South 36-27-54 East, a distance of 286.4572
Exhibit G – Description of the Water Management Plan Area Thence South 63-00-19 East, a distance of 320.4094
Thence South 87-05-43 East, a distance of 659.8478
Thence South 87-18-26 East, a distance of 717.0418
Thence North 78-19-20 East, a distance of 410.3691
Thence North 86-20-49 East, a distance of 402.1922
Thence North 75-28-47 East, a distance of 444.9628
Thence North 68-35-42 East, a distance of 463.0656
Thence South 89-35-15 East, a distance of 573.1398
Thence North 74-30-26 East, a distance of 208.7087
Thence North 67-12-39 East, a distance of 218.1548
Thence North 40-38-39 East, a distance of 488.2085
Thence North 56-43-24 East, a distance of 309.9471
Thence North 82-49-48 East, a distance of 433.6411
Thence South 64-49-28 East, a distance of 410.3555
Thence South 79-35-09 East, a distance of 494.7756
Thence South 51-42-35 East, a distance of 326.8004
Thence South 67-19-51 East, a distance of 681.2553
Thence South 53-53-05 East, a distance of 1129.4102
Thence South 36-27-09 East, a distance of 573.2902
Thence South 69-38-11 East, a distance of 335.3323
Thence North 82-19-37 East, a distance of 202.6898
Thence North 75-09-58 East, a distance of 326.6362
Thence South 86-44-29 East, a distance of 573.9280
Thence South 44-35-15 East, a distance of 405.2711
Thence South 54-53-15 East, a distance of 453.2260
Thence South 26-08-48 East, a distance of 256.4275
Thence South 70-17-49 East, a distance of 607.3060
Thence South 72-29-09 East, a distance of 389.8210
Thence South 57-07-23 East, a distance of 373.7322
Thence South 78-17-20 East, a distance of 292.2079
Thence North 60-38-50 East, a distance of 231.0356
Thence North 63-52-05 East, a distance of 192.2792
Thence North 63-50-06 East, a distance of 256.2596
Thence North 33-14-52 West, a distance of 103.2813
Thence North 73-39-56 West, a distance of 208.6728
Thence North 83-14-16 West, a distance of 259.5556
Thence North 83-52-07 West, a distance of 287.8969
Thence North 38-15-29 West, a distance of 183.7039
Thence North 31-36-33 West, a distance of 270.2132
Thence North 06-40-38 West, a distance of 231.1308
Thence North 31-21-38 East, a distance of 167.1723
Thence North 36-29-06 West, a distance of 286.5315
Thence North 52-43-48 West, a distance of 143.2535
Thence North 12-07-13 West, a distance of 264.3292
Thence North 00-26-14 East, a distance of 229.3817
Thence North 49-48-32 East, a distance of 264.1064
Thence North 63-50-04 East, a distance of 64.2044
Thence North 81-00-14 East, a distance of 174.2687
Thence North 37-17-40 East, a distance of 143.3793
Thence North 11-41-40 East, a distance of 146.1588
Thence North 00-22-29 East, a distance of 114.6895
Thence North 44-33-45 West, a distance of 162.1090
Thence North 54-04-38 West, a distance of 246.5087
Thence North 74-39-06 West, a distance of 444.8663
Thence North 55-53-48 West, a distance of 206.6659
Thence North 81-26-16 West, a distance of 202.7599
Exhibit G – Description of the Water Management Plan Area Thence North 89-35-15 West, a distance of 286.5074
Thence South 60-39-45 West, a distance of 231.1446
Thence South 75-28-47 West, a distance of 444.9625
Thence South 84-04-11 West, a distance of 259.5139
Thence North 74-39-14 West, a distance of 889.8532
Thence North 37-28-30 West, a distance of 326.6682
Thence North 60-56-43 West, a distance of 359.0601
Thence North 51-42-35 West, a distance of 326.8004
Thence North 74-40-45 West, a distance of 444.9374
Thence North 78-16-36 West, a distance of 584.4413
Thence North 59-50-38 West, a distance of 462.3204
Thence North 41-12-16 West, a distance of 345.1619
Thence North 36-28-24 West, a distance of 429.8103
Thence North 44-33-45 West, a distance of 324.2179
Thence North 78-17-37 West, a distance of 292.3305
Thence North 82-27-35 West, a distance of 230.9974
Thence North 85-45-59 West, a distance of 430.9259
Thence North 74-51-11 West, a distance of 563.0613
Thence South 86-51-26 West, a distance of 459.4410
Thence South 66-26-36 West, a distance of 282.2731
Thence North 87-12-58 West, a distance of 688.4375
Thence North 66-44-39 West, a distance of 590.7479
Thence North 71-08-45 West, a distance of 815.7709
Thence North 61-17-05 West, a distance of 423.1666
Thence North 75-34-27 West, a distance of 472.6522
Thence North 86-00-24 West, a distance of 459.4906
Thence North 54-52-19 West, a distance of 453.1594
Thence North 77-03-58 West, a distance of 792.7378
Thence North 64-34-10 West, a distance of 474.3353
Thence North 69-21-42 West, a distance of 580.3709
Thence North 65-57-27 West, a distance of 500.4138
Thence North 48-24-23 West, a distance of 914.0925
Thence North 48-58-47 West, a distance of 528.5110
Thence North 26-09-15 West, a distance of 576.8086
Thence North 28-38-22 West, a distance of 294.9630
Thence North 05-55-05 West, a distance of 259.4447
Thence North 39-03-22 East, a distance of 183.5086
Thence North 08-32-50 East, a distance of 202.6892
Thence North 18-02-29 West, a distance of 181.2221
Thence North 44-34-49 West, a distance of 283.6904
Thence North 16-56-18 West, a distance of 480.5332
Thence North 26-57-57 East, a distance of 63.9531
Thence North 26-59-06 East, a distance of 320.3812
Thence North 00-24-56 East, a distance of 86.1903
Thence North 13-36-07 West, a distance of 117.9965
Thence North 55-53-15 West, a distance of 103.4197
Thence North 80-07-57 West, a distance of 348.6579
Thence South 83-19-15 West, a distance of 231.0682
Thence South 71-56-46 West, a distance of 181.3012
Thence North 89-35-15 West, a distance of 286.5074
Thence North 65-37-31 West, a distance of 282.2862
Thence North 21-24-19 West, a distance of 154.4679
Thence North 00-25-00 East, a distance of 257.8188
Thence North 50-35-45 East, a distance of 223.8940
Thence North 72-00-09 East, a distance of 362.4866
Thence North 77-51-49 East, a distance of 264.2818
Exhibit G – Description of the Water Management Plan Area Thence North 51-44-27 East, a distance of 367.0951
Thence North 54-54-11 East, a distance of 246.4308
Thence North 56-41-40 East, a distance of 310.0497
Thence North 62-07-05 East, a distance of 423.2595
Thence North 06-43-28 East, a distance of 259.4095
Thence North 21-22-37 West, a distance of 617.2803
Thence North 23-33-48 West, a distance of 282.3551
Thence North 89-33-45 West, a distance of 114.6283
Thence North 89-35-22 West, a distance of 401.2603
Thence South 69-51-30 West, a distance of 244.8490
Thence South 60-09-01 West, a distance of 398.0591
Thence South 54-23-11 West, a distance of 389.9315
Thence South 54-22-33 West, a distance of 389.8293
Thence South 61-48-41 West, a distance of 359.0890
Thence South 84-03-32 West, a distance of 259.6446
Thence North 89-35-15 West, a distance of 286.5074
Thence North 57-07-23 West, a distance of 373.7322
Thence North 00-24-59 East, a distance of 258.0698
Thence North 30-40-48 East, a distance of 398.0960
Thence North 00-23-59 East, a distance of 143.3785
Thence North 18-00-35 West, a distance of 90.5622
Thence North 40-11-02 West, a distance of 264.2419
Thence North 65-07-41 West, a distance of 346.2386
Thence North 83-15-30 West, a distance of 519.0892
Thence North 44-35-39 West, a distance of 324.3934
Thence North 60-59-24 West, a distance of 359.0481
Thence North 30-30-56 West, a distance of 167.1519
Thence North 18-02-29 West, a distance of 362.4451
Thence North 00-25-00 East, a distance of 171.9425
Thence North 53-32-05 East, a distance of 286.7694
Thence North 79-07-22 East, a distance of 292.1233
Thence South 89-35-23 East, a distance of 200.6301
Thence South 84-48-57 East, a distance of 345.1619
Thence South 50-18-17 East, a distance of 407.2701
Thence South 44-36-07 East, a distance of 324.3485
Thence South 47-35-44 East, a distance of 385.4597
Thence South 47-57-26 East, a distance of 345.2181
Thence South 50-18-41 East, a distance of 407.2305
Thence South 65-07-08 East, a distance of 346.2647
Thence South 85-11-02 East, a distance of 373.6944
Thence South 89-35-12 East, a distance of 372.6347
Thence North 70-25-25 East, a distance of 335.3866
Thence North 67-14-11 East, a distance of 218.3853
Thence North 32-23-49 East, a distance of 270.3989
Thence North 00-24-59 East, a distance of 344.0091
Thence North 06-44-46 West, a distance of 230.9107
Thence North 37-17-40 East, a distance of 286.7579
Thence North 00-23-34 East, a distance of 200.5677
Thence North 00-23-58 East, a distance of 143.4405
Thence North 54-03-04 West, a distance of 493.0265
Thence North 79-16-58 West, a distance of 640.9295
Thence North 85-45-54 West, a distance of 430.8012
Thence North 74-20-13 West, a distance of 653.5178
Thence North 71-09-25 West, a distance of 543.7674
Thence North 53-33-23 West, a distance of 779.7344
Thence North 26-08-55 West, a distance of 768.9482
Exhibit G – Description of the Water Management Plan Area Thence North 21-24-02 West, a distance of 617.3128
Thence North 04-14-31 East, a distance of 430.9305
Thence North 42-24-18 East, a distance of 385.5473
Thence North 41-00-36 East, a distance of 264.2145
Thence North 30-08-41 East, a distance of 230.9893
Thence North 07-43-31 West, a distance of 202.7149
Thence North 40-45-25 West, a distance of 304.6257
Thence North 70-17-49 West, a distance of 607.3060
Thence North 55-54-46 West, a distance of 310.0155
Thence North 26-09-10 West, a distance of 256.3718
Thence North 00-27-01 East, a distance of 143.1924
Thence North 14-27-19 East, a distance of 118.1782
Thence North 00-23-59 East, a distance of 143.3785
Thence North 54-03-37 West, a distance of 246.4075
Thence North 81-58-34 West, a distance of 433.8727
Thence North 77-04-54 West, a distance of 264.1866
Thence North 37-26-54 West, a distance of 326.8667
Thence North 00-25-42 East, a distance of 200.6306
Thence North 00-24-14 East, a distance of 372.5092
Thence North 15-40-06 East, a distance of 326.7674
Thence North 16-21-03 East, a distance of 208.6903
Thence North 35-24-20 East, a distance of 349.7396
Thence North 63-50-04 East, a distance of 64.2044
Thence North 63-50-50 East, a distance of 256.3718
Thence North 56-43-24 East, a distance of 309.9471
Thence North 53-33-00 East, a distance of 286.5577
Thence North 76-22-18 East, a distance of 945.3672
Thence North 52-15-15 East, a distance of 510.2846
Thence North 66-11-52 East, a distance of 628.5904
Thence North 74-26-54 East, a distance of 625.9155
Thence North 58-25-38 East, a distance of 270.2542
Thence South 85-01-19 East, a distance of 718.8363
Thence South 63-01-36 East, a distance of 384.4457
Thence South 66-20-26 East, a distance of 218.3532
Thence South 69-03-13 East, a distance of 244.9364
Thence North 83-16-16 East, a distance of 230.9660
Thence North 53-34-47 East, a distance of 143.3794
Thence South 84-23-40 East, a distance of 949.5407
Thence South 56-51-35 East, a distance of 476.9601
Thence South 58-35-04 East, a distance of 167.2702
Thence North 84-03-22 East, a distance of 519.0406
Thence North 56-46-52 East, a distance of 103.2473
Thence North 58-23-45 East, a distance of 270.4916
Thence North 71-54-54 East, a distance of 90.6009
Thence South 89-35-01 East, a distance of 172.0045
Thence South 74-03-10 East, a distance of 535.4830
Thence South 44-34-13 East, a distance of 324.1737
Thence South 33-18-20 East, a distance of 310.0497
Thence South 20-36-19 East, a distance of 399.2270
Thence South 47-58-49 East, a distance of 345.0929
Thence South 53-33-09 East, a distance of 389.8856
Thence South 76-35-51 East, a distance of 764.7010
Thence South 81-44-01 East, a distance of 838.9669
Thence South 77-41-35 East, a distance of 556.5393
Thence South 84-08-48 East, a distance of 1209.1792
Thence South 87-06-12 East, a distance of 1319.5612
Exhibit G – Description of the Water Management Plan Area Thence North 82-17-20 East, a distance of 607.8717
Thence South 89-35-38 East, a distance of 458.6365
Thence North 68-02-09 East, a distance of 526.8664
Thence North 76-22-18 East, a distance of 472.6836
Thence North 76-23-14 East, a distance of 590.8480
Thence South 89-35-37 East, a distance of 114.5029
Thence North 56-42-13 East, a distance of 103.4884
Thence North 63-53-06 East, a distance of 128.0747
Thence North 45-25-36 East, a distance of 243.2076
Thence North 29-27-11 East, a distance of 295.1445
Thence North 41-00-36 East, a distance of 264.2145
Thence South 89-35-37 East, a distance of 114.6279
Thence North 82-16-29 East, a distance of 202.7149
Thence South 89-35-00 East, a distance of 257.8818
Thence South 83-52-26 East, a distance of 288.1455
Thence South 52-40-48 East, a distance of 143.1916
Thence South 30-33-09 East, a distance of 167.2154
Thence South 09-52-16 West, a distance of 174.2679
Thence South 30-08-41 West, a distance of 230.9893
Thence South 22-12-22 West, a distance of 154.4560
Thence South 00-26-15 West, a distance of 229.1317
Thence South 00-23-59 West, a distance of 143.3785
Thence South 26-09-10 East, a distance of 384.5573
Thence South 30-33-01 East, a distance of 334.2063
Thence South 47-04-25 East, a distance of 466.5541
Thence South 59-51-47 East, a distance of 462.0867
Thence South 66-04-10 East, a distance of 718.7888
Thence South 60-34-06 East, a distance of 295.0830
Thence South 36-26-24 East, a distance of 429.9371
Thence South 38-16-32 East, a distance of 183.4302
Thence South 50-55-44 East, a distance of 367.0959
Thence South 80-07-32 East, a distance of 522.9976
Thence South 83-14-16 East, a distance of 259.5556
Thence South 89-35-00 East, a distance of 343.8841
Thence North 59-26-40 East, a distance of 167.0758
Thence North 60-38-50 East, a distance of 231.0356
Thence North 66-27-54 East, a distance of 282.3629
Thence North 63-51-05 East, a distance of 192.3069
Thence South 89-35-22 East, a distance of 200.5051
Thence South 44-36-00 East, a distance of 202.5910
Thence South 18-01-23 East, a distance of 181.4008
Thence South 13-38-22 East, a distance of 236.4173
Thence South 03-58-18 East, a distance of 373.5851
Thence South 10-53-48 East, a distance of 292.2697
Thence South 22-46-58 East, a distance of 218.2120
Thence South 31-34-53 East, a distance of 270.4261
Thence South 39-24-51 East, a distance of 223.8461
Thence North 76-20-46 East, a distance of 118.0872
Thence North 68-37-46 East, a distance of 154.3636
Thence North 18-52-43 East, a distance of 181.1847
Thence North 26-57-53 East, a distance of 256.3714
Thence North 18-50-39 East, a distance of 362.6232
Thence North 36-25-57 East, a distance of 389.8114
Thence North 45-25-49 East, a distance of 364.7890
Thence North 58-48-12 East, a distance of 437.5179
Thence North 73-54-12 East, a distance of 807.0133
Exhibit G – Description of the Water Management Plan Area Thence South 89-35-13 East, a distance of 372.6347
Thence South 70-07-37 East, a distance of 516.6417
Thence South 57-26-00 East, a distance of 1184.7900
Thence South 42-06-12 East, a distance of 933.1152
Thence South 68-33-43 East, a distance of 399.1137
Thence South 44-35-55 East, a distance of 283.7774
Thence South 68-32-12 East, a distance of 399.1825
Thence South 71-10-13 East, a distance of 453.1256
Thence South 86-24-01 East, a distance of 516.6443
Thence South 63-00-36 East, a distance of 256.2886
Thence South 47-57-26 East, a distance of 345.2181
Thence South 61-08-28 East, a distance of 782.1325
Thence South 53-20-23 East, a distance of 533.2286
Thence South 58-37-21 East, a distance of 835.5739
Thence South 44-35-29 East, a distance of 526.8518
Thence South 68-43-27 East, a distance of 644.0187
Thence South 60-46-50 East, a distance of 654.2487
Thence South 56-28-54 East, a distance of 786.8458
Thence South 34-42-45 East, a distance of 946.2958
Thence South 31-35-39 East, a distance of 1081.5570
Thence South 24-47-42 East, a distance of 1076.9010
Thence South 09-02-24 East, a distance of 174.2261
Thence South 10-53-23 East, a distance of 292.4543
Thence South 29-50-59 East, a distance of 398.0591
Thence South 54-01-30 East, a distance of 246.5173
Thence South 55-54-06 East, a distance of 206.8047
Thence South 39-23-59 East, a distance of 223.7180
Thence South 35-07-27 East, a distance of 246.5891
Thence South 49-48-18 East, a distance of 223.7016
Thence South 71-06-40 East, a distance of 272.0239
Thence South 82-30-21 East, a distance of 230.9730
Thence South 89-35-39 East, a distance of 114.6279
Thence South 78-15-28 East, a distance of 146.1842
Thence South 63-02-06 East, a distance of 192.2788
Thence South 62-57-36 East, a distance of 128.1311
Thence North 00-22-28 East, a distance of 57.3762
Thence North 30-32-53 West, a distance of 166.9909
Thence North 36-27-13 West, a distance of 430.0114
Thence North 55-53-59 West, a distance of 309.9120
Thence North 29-50-11 West, a distance of 398.2213
Thence North 16-42-00 West, a distance of 389.7520
Thence North 03-40-13 West, a distance of 402.2620
Thence North 34-06-00 East, a distance of 310.1378
Thence South 89-35-37 East, a distance of 114.6279
Thence South 89-35-00 East, a distance of 257.8818
Thence South 33-18-20 East, a distance of 103.3499
Thence South 50-17-04 East, a distance of 407.3895
Thence South 83-51-32 East, a distance of 288.0279
Thence South 63-02-07 East, a distance of 192.2783
Thence South 58-09-42 East, a distance of 604.5925
Thence South 59-00-31 East, a distance of 732.2881
Thence North 85-12-37 East, a distance of 316.6057
Thence South 89-35-00 East, a distance of 343.8841
Thence South 79-34-59 East, a distance of 494.6526
Thence North 51-42-18 West, a distance of 326.6633
Thence North 53-35-56 West, a distance of 82.4656
Exhibit G – Description of the Water Management Plan Area Thence North 53-34-06 West, a distance of 307.3090
Thence North 55-53-22 West, a distance of 413.3665
Thence North 72-53-50 West, a distance of 598.4647
Thence North 60-58-05 West, a distance of 718.2480
Thence North 46-42-41 West, a distance of 390.6740
Thence North 46-42-44 West, a distance of 156.7825
Thence North 44-35-15 West, a distance of 405.2711
Thence North 46-18-48 West, a distance of 669.1426
Thence North 37-52-35 West, a distance of 693.8574
Thence North 34-17-42 West, a distance of 906.2395
Thence North 33-57-07 West, a distance of 659.8059
Thence North 44-35-16 West, a distance of 608.0830
Thence North 46-47-40 West, a distance of 1054.3274
Thence North 48-19-10 West, a distance of 1868.4824
Thence North 56-06-31 West, a distance of 2130.4779
Thence North 66-07-44 West, a distance of 1655.6256
Thence North 58-12-53 West, a distance of 1376.2780
Thence North 41-24-29 West, a distance of 730.8163
Thence North 41-13-30 West, a distance of 345.0212
Thence North 26-08-55 West, a distance of 384.6138
Thence North 13-37-46 West, a distance of 354.3535
Thence North 41-34-35 West, a distance of 385.5755
Thence North 42-50-20 West, a distance of 669.1777
Thence North 50-29-55 West, a distance of 1181.6210
Thence North 31-24-48 West, a distance of 978.2580
Thence North 26-09-14 West, a distance of 704.9949
Thence North 08-33-23 West, a distance of 551.1343
Thence North 10-42-42 East, a distance of 640.9180
Thence North 35-06-54 East, a distance of 453.0875
Thence North 45-23-44 East, a distance of 243.3389
Thence North 52-32-18 East, a distance of 326.7674
Thence North 00-25-00 East, a distance of 171.8795
Thence North 34-34-34 West, a distance of 349.7803
Thence North 44-35-13 West, a distance of 337.0774
Thence North 44-35-20 West, a distance of 271.0057
Thence North 27-14-21 West, a distance of 679.4763
Thence North 09-26-25 West, a distance of 669.1250
Thence North 15-50-43 West, a distance of 716.4738
Thence North 22-47-41 West, a distance of 436.5304
Thence North 20-37-42 West, a distance of 399.1550
Thence North 05-56-49 West, a distance of 259.3960
Thence North 12-05-28 West, a distance of 264.3646
Thence North 14-27-19 East, a distance of 118.1782
Thence North 50-21-25 East, a distance of 158.1102
Thence North 65-13-15 East, a distance of 328.2188
Thence North 82-49-41 East, a distance of 264.3181
Thence South 84-49-29 East, a distance of 420.5895
Thence South 77-19-12 East, a distance of 411.1524
Thence South 62-03-23 East, a distance of 453.0744
Thence South 53-30-14 East, a distance of 237.5929
Thence South 57-59-51 East, a distance of 266.6488
Thence South 66-45-48 East, a distance of 360.0835
Thence South 74-02-50 East, a distance of 326.3171
Thence South 70-08-39 East, a distance of 314.8424
Thence South 63-01-30 East, a distance of 234.3736
Thence South 35-38-22 East, a distance of 237.4798
Exhibit G – Description of the Water Management Plan Area Thence South 42-04-07 East, a distance of 284.3200
Thence South 48-59-46 East, a distance of 322.1632
Thence South 55-05-28 East, a distance of 338.9985
Thence South 76-41-52 East, a distance of 627.2030
Thence South 80-50-12 East, a distance of 689.1699
Thence South 68-34-43 East, a distance of 243.1736
Thence South 51-17-14 East, a distance of 422.9187
Thence South 23-13-07 East, a distance of 305.0162
Thence South 17-07-37 East, a distance of 348.0598
Thence South 20-36-34 East, a distance of 243.2560
Thence South 77-20-44 East, a distance of 411.1112
Thence North 88-22-32 East, a distance of 489.4467
Thence South 89-35-23 East, a distance of 209.5054
Thence South 77-48-51 East, a distance of 428.1470
Thence South 46-33-41 East, a distance of 358.4156
Thence South 54-02-09 East, a distance of 300.5375
Thence North 76-21-42 East, a distance of 288.1242
Thence North 17-30-54 East, a distance of 237.5765
Thence North 16-48-48 East, a distance of 309.4149
Thence North 34-06-01 East, a distance of 125.9718
Thence North 84-56-56 East, a distance of 368.4308
Thence South 89-35-24 East, a distance of 227.1308
Thence South 79-15-43 East, a distance of 390.4622
Thence South 89-35-24 East, a distance of 751.1442
Thence North 68-02-21 East, a distance of 321.0451
Thence North 76-24-34 East, a distance of 144.1615
Thence North 82-57-46 East, a distance of 405.0514
Thence North 77-54-02 East, a distance of 322.0287
Thence South 66-25-23 East, a distance of 265.9506
Thence South 68-58-41 East, a distance of 149.3127
Thence North 54-52-10 East, a distance of 300.6385
Thence North 29-27-12 East, a distance of 179.7287
Thence North 56-43-55 East, a distance of 251.9098
Thence South 81-28-20 East, a distance of 370.4709
Thence South 78-57-07 East, a distance of 284.3959
Thence South 67-47-29 East, a distance of 470.2621
Thence South 83-24-48 East, a distance of 650.0405
Thence South 87-51-03 East, a distance of 576.6556
Thence North 81-40-49 East, a distance of 229.7933
Thence South 89-34-59 East, a distance of 524.0139
Thence South 80-08-29 East, a distance of 424.8993
Thence South 68-58-59 East, a distance of 149.1738
Thence South 85-18-12 East, a distance of 700.7279
Thence North 69-21-28 East, a distance of 243.2410
Thence North 83-18-13 East, a distance of 140.9616
Thence North 87-02-55 East, a distance of 297.3945
Thence South 84-24-08 East, a distance of 385.7145
Thence South 73-38-13 East, a distance of 381.5806
Thence South 60-46-31 East, a distance of 398.7573
Thence South 44-33-51 East, a distance of 197.5537
Thence South 44-36-26 East, a distance of 148.2746
Thence South 80-51-20 East, a distance of 229.6689
Thence South 77-41-23 East, a distance of 339.1733
Thence South 80-08-20 East, a distance of 106.1940
Thence South 74-17-21 East, a distance of 199.1918
Thence South 63-03-57 East, a distance of 156.1926
Exhibit G – Description of the Water Management Plan Area Thence South 89-35-24 East, a distance of 139.7536
Thence North 69-52-16 East, a distance of 149.1074
Thence South 74-22-05 East, a distance of 199.2446
Thence South 54-02-09 East, a distance of 150.2688
Thence South 57-32-02 East, a distance of 164.7486
Thence South 80-08-39 East, a distance of 212.5112
Thence South 81-28-20 East, a distance of 246.9807
Thence South 57-34-32 East, a distance of 164.8208
Thence South 59-51-45 East, a distance of 281.7053
Thence South 49-18-45 East, a distance of 297.3849
Thence South 53-35-18 East, a distance of 237.6448
Thence South 41-33-00 East, a distance of 235.0086
Thence South 49-00-08 East, a distance of 483.1160
Thence South 55-49-43 East, a distance of 125.8518
Thence South 44-35-25 East, a distance of 123.5701
Thence South 44-36-30 East, a distance of 271.6237
Thence South 44-36-10 East, a distance of 197.5973
Thence South 31-11-39 East, a distance of 266.6825
Thence South 29-50-24 East, a distance of 242.6743
Thence South 26-09-18 East, a distance of 273.3663
Thence South 28-55-20 East, a distance of 320.7559
Thence South 44-37-15 East, a distance of 247.0063
Thence South 39-21-54 East, a distance of 136.3797
Thence South 39-30-43 East, a distance of 1115.9357
Thence South 56-57-13 East, a distance of 518.5041
Thence South 32-18-58 East, a distance of 290.6424
Thence South 54-36-52 East, a distance of 213.2716
Thence South 47-36-34 East, a distance of 234.9146
Thence South 44-35-24 East, a distance of 172.8920
Thence South 35-05-29 East, a distance of 150.2478
Thence South 59-20-24 East, a distance of 242.6739
Thence South 59-19-30 East, a distance of 242.5664
Thence South 89-35-24 East, a distance of 139.7536
Thence South 89-35-24 East, a distance of 139.7536
Thence South 89-35-23 East, a distance of 52.3763
Thence North 67-16-06 East, a distance of 132.9522
Thence North 00-24-32 East, a distance of 52.5643
Thence North 33-16-47 West, a distance of 62.8730
Thence North 58-37-01 West, a distance of 203.6710
Thence North 47-58-30 West, a distance of 210.3380
Thence North 50-17-39 West, a distance of 248.1038
Thence North 41-34-22 West, a distance of 235.0915
Thence North 35-34-47 West, a distance of 237.6102
Thence North 52-44-11 West, a distance of 261.9812
Thence North 49-21-11 West, a distance of 297.5341
Thence North 49-21-20 West, a distance of 297.3572
Thence North 44-34-50 West, a distance of 271.7576
Thence North 38-15-35 West, a distance of 335.4983
Thence North 27-27-57 West, a distance of 336.0671
Thence North 50-30-00 West, a distance of 360.1165
Thence North 21-23-39 West, a distance of 470.1461
Thence North 10-11-56 West, a distance of 284.4954
Thence North 07-44-11 West, a distance of 246.9982
Thence North 19-33-17 West, a distance of 204.2826
Thence North 41-52-09 West, a distance of 259.7636
Thence North 63-00-09 West, a distance of 429.5609
Exhibit G – Description of the Water Management Plan Area Thence North 43-07-25 West, a distance of 481.8419
Thence North 42-44-17 West, a distance of 382.9316
Thence North 28-24-46 West, a distance of 398.7864
Thence North 28-23-07 West, a distance of 398.6130
Thence North 38-46-12 West, a distance of 608.4346
Thence North 72-21-04 West, a distance of 530.2057
Thence North 77-53-41 West, a distance of 517.3797
Thence North 84-31-51 West, a distance of 596.0885
Thence North 68-33-48 West, a distance of 486.5318
Thence North 67-12-28 West, a distance of 642.2768
Thence North 76-42-02 West, a distance of 627.0671
Thence North 60-32-28 West, a distance of 899.1237
Thence North 75-54-13 West, a distance of 665.1543
Thence North 66-23-19 West, a distance of 665.0515
Thence North 80-51-29 West, a distance of 459.4613
Thence North 74-27-13 West, a distance of 669.4943
Thence North 63-02-06 West, a distance of 312.4704
Thence North 73-53-13 West, a distance of 580.5569
Thence North 76-51-43 West, a distance of 555.1563
Thence North 72-03-23 West, a distance of 347.9228
Thence North 71-08-13 West, a distance of 497.2030
Thence North 69-01-58 West, a distance of 746.1565
Thence North 46-26-06 West, a distance of 382.9739
Thence North 55-28-34 West, a distance of 654.0611
Thence North 65-37-13 West, a distance of 516.0126
Thence North 73-38-41 West, a distance of 508.7107
Thence North 70-36-46 West, a distance of 591.0123
Thence North 69-01-55 West, a distance of 447.6429
Thence North 64-48-32 West, a distance of 1750.7575
Thence North 68-24-13 West, a distance of 917.8053
Thence North 68-02-33 West, a distance of 1427.2827
Thence North 64-07-22 West, a distance of 1625.0677
Thence North 43-46-42 West, a distance of 876.7911
Thence North 47-49-40 West, a distance of 655.7561
Thence North 61-41-57 West, a distance of 335.8997
Thence North 51-42-49 West, a distance of 199.2231
Thence North 48-40-34 West, a distance of 346.7099
Thence North 47-34-33 West, a distance of 235.0408
Thence North 36-26-36 West, a distance of 174.6548
Thence North 09-53-20 East, a distance of 106.2668
Thence South 78-41-19 East, a distance of 462.3561
Thence South 74-50-24 East, a distance of 343.1933
Thence South 79-53-51 East, a distance of 726.5141
Thence South 82-28-31 East, a distance of 422.3874
Thence North 74-29-44 East, a distance of 254.3821
Thence North 67-11-37 East, a distance of 399.0744
Thence North 60-41-37 East, a distance of 281.6756
Thence North 79-05-27 East, a distance of 445.1700
Thence North 00-26-51 East, a distance of 192.0059
Thence North 31-36-58 West, a distance of 164.7668
Thence North 80-07-13 West, a distance of 637.4534
Thence North 79-17-00 West, a distance of 585.8427
Thence North 83-52-06 West, a distance of 702.1421
Thence North 81-40-22 West, a distance of 634.8176
Thence North 71-46-52 West, a distance of 513.7552
Thence North 78-48-11 West, a distance of 746.7136
Exhibit G – Description of the Water Management Plan Area Thence North 70-26-56 West, a distance of 905.9868
Thence North 65-52-49 West, a distance of 2823.3710
Thence North 52-03-27 West, a distance of 1519.7285
Thence North 36-15-37 West, a distance of 1023.5333
Thence North 28-50-12 West, a distance of 1501.3573
Thence North 03-16-40 East, a distance of 699.5825
Thence North 40-00-38 East, a distance of 657.5376
Thence North 55-55-24 East, a distance of 339.1029
Thence North 56-42-53 East, a distance of 377.8643
Thence North 26-59-25 East, a distance of 312.6105
Thence North 71-58-47 East, a distance of 497.0045
Thence North 80-06-42 East, a distance of 585.9547
Thence South 87-23-25 East, a distance of 454.3462
Thence North 42-41-35 East, a distance of 519.3043
Thence North 65-30-29 East, a distance of 539.2736
Thence North 85-13-27 East, a distance of 192.9198
Thence South 77-48-22 East, a distance of 428.1601
Thence South 79-18-05 East, a distance of 195.2692
Thence North 69-51-14 East, a distance of 298.5136
Thence North 28-19-28 East, a distance of 335.9044
Thence North 31-22-11 East, a distance of 305.6825
Thence North 56-01-15 East, a distance of 402.0238
Thence North 82-39-26 East, a distance of 387.8052
Thence North 78-08-24 East, a distance of 411.1519
Thence North 60-22-03 East, a distance of 383.3919
Thence North 59-26-14 East, a distance of 203.6705
Thence North 05-12-58 East, a distance of 210.3711
Thence North 54-35-53 West, a distance of 426.4772
Thence North 11-40-50 West, a distance of 250.0533
Thence North 49-48-05 East, a distance of 161.0345
Thence North 48-23-44 East, a distance of 235.0392
Thence North 00-24-37 East, a distance of 174.5675
Thence North 23-13-24 West, a distance of 304.9592
Thence North 70-45-15 East, a distance of 259.7676
Thence South 78-49-18 East, a distance of 373.3326
Thence South 72-19-46 East, a distance of 530.4007
Thence North 68-01-44 East, a distance of 321.0687
Thence North 61-21-05 East, a distance of 179.8988
Thence North 15-39-15 East, a distance of 199.2007
Thence North 00-24-37 East, a distance of 174.5675
Thence North 09-52-20 West, a distance of 195.3932
Thence North 38-41-05 West, a distance of 359.9806
Thence North 38-15-35 West, a distance of 335.4983
Thence North 24-47-03 West, a distance of 328.3020
Thence North 18-01-30 West, a distance of 220.9698
Thence North 00-27-21 East, a distance of 157.1300
Thence North 24-36-33 West, a distance of 289.0680
Thence North 26-08-49 West, a distance of 195.4380
Thence North 37-10-21 West, a distance of 286.5286
Thence North 71-10-31 West, a distance of 276.0141
Thence North 89-35-24 West, a distance of 366.7594
Thence North 47-18-37 West, a distance of 259.8516
Thence North 02-26-15 West, a distance of 349.7545
Thence North 02-27-48 West, a distance of 125.0526
Thence North 02-27-50 West, a distance of 78.5106
Thence North 02-27-01 West, a distance of 146.1957
Exhibit G – Description of the Water Management Plan Area Thence North 05-17-26 West, a distance of 351.1208
Thence North 29-50-24 West, a distance of 242.6743
Thence North 87-54-29 West, a distance of 594.1460
Thence South 25-25-45 West, a distance of 289.0690
Thence South 07-33-35 West, a distance of 54.1577
Thence South 07-31-36 West, a distance of 368.3617
Thence South 15-40-43 West, a distance of 398.2550
Thence South 21-34-12 West, a distance of 580.7325
Thence South 17-07-05 West, a distance of 546.9813
Thence South 18-03-11 West, a distance of 403.3575
Thence South 25-37-23 West, a distance of 328.0751
Thence South 34-42-09 West, a distance of 465.0331
Thence South 25-01-48 West, a distance of 461.1868
Thence South 54-23-57 West, a distance of 475.1916
Thence South 69-37-52 West, a distance of 541.7496
Thence North 73-56-54 West, a distance of 453.4280
Thence North 48-34-43 West, a distance of 532.4290
Thence North 28-23-07 West, a distance of 398.6121
Thence North 54-35-53 West, a distance of 426.4777
Thence North 16-41-42 West, a distance of 237.5764
Thence North 12-06-59 West, a distance of 322.1772
Thence North 33-16-47 West, a distance of 251.7194
Thence North 60-46-31 West, a distance of 398.7569
Thence North 40-31-06 West, a distance of 346.7031
Thence North 29-18-46 West, a distance of 281.6207
Thence North 31-34-49 West, a distance of 329.6291
Thence North 65-37-55 West, a distance of 344.1602
Thence North 33-16-48 West, a distance of 314.8173
Thence North 40-10-53 West, a distance of 160.9938
Thence South 48-09-08 West, a distance of 259.5913
Thence South 05-10-56 West, a distance of 210.3598
Thence South 01-52-06 East, a distance of 437.1073
Thence South 17-14-28 East, a distance of 403.1796
Thence South 16-17-52 East, a distance of 546.9801
Thence South 17-24-29 East, a distance of 513.9131
Thence South 44-35-54 East, a distance of 296.2405
Thence South 40-10-11 East, a distance of 322.2593
Thence South 35-07-29 East, a distance of 300.4644
Thence South 31-25-13 East, a distance of 596.0948
Thence South 27-28-50 East, a distance of 335.9003
Thence South 04-21-44 East, a distance of 210.3594
Thence South 42-01-35 West, a distance of 210.4263
Thence South 45-23-50 West, a distance of 197.5089
Thence South 52-08-16 West, a distance of 422.9006
Thence South 45-24-36 West, a distance of 469.3541
Thence South 70-25-56 West, a distance of 408.8638
Thence South 66-59-15 West, a distance of 571.0711
Thence South 33-18-10 West, a distance of 353.7851
Thence South 37-17-32 West, a distance of 349.2845
Thence South 49-29-46 West, a distance of 346.7099
Thence South 65-13-51 West, a distance of 328.1924
Thence South 55-43-12 West, a distance of 276.0820
Thence South 59-26-46 West, a distance of 407.4482
Thence South 55-41-57 West, a distance of 385.3996
Thence South 74-49-34 West, a distance of 746.6568
Thence South 88-29-17 West, a distance of 502.1748
Exhibit G – Description of the Water Management Plan Area Thence North 70-28-56 West, a distance of 460.1936
Thence North 69-36-20 West, a distance of 783.2207
Thence North 43-33-28 West, a distance of 939.4676
Thence North 43-33-19 West, a distance of 1036.0201
Thence North 40-54-46 West, a distance of 2583.7541
Thence North 31-11-35 West, a distance of 1531.8376
Thence North 29-04-17 West, a distance of 883.9252
Thence North 09-00-43 East, a distance of 1454.7700
Thence North 54-11-24 West, a distance of 779.7834
Thence North 87-31-53 West, a distance of 468.6850
Thence North 57-43-25 West, a distance of 728.5775
Thence North 45-11-13 West, a distance of 1123.8200
Thence North 42-28-03 West, a distance of 639.0971
Thence North 44-35-23 West, a distance of 993.5551
Thence North 53-37-20 West, a distance of 1053.8761
Thence North 45-08-03 West, a distance of 1265.5924
Thence North 59-09-53 West, a distance of 2532.3330
Thence North 47-35-59 West, a distance of 2350.0134
Thence North 58-27-25 West, a distance of 2060.8752
Thence North 66-50-08 West, a distance of 1174.2981
Thence North 63-57-03 West, a distance of 968.6480
Thence North 63-00-31 West, a distance of 390.6801
Thence North 70-40-49 West, a distance of 646.2686
Thence North 40-55-19 West, a distance of 581.6539
Thence North 34-57-19 West, a distance of 664.1211
Thence North 29-30-50 West, a distance of 665.0486
Thence North 40-11-42 West, a distance of 644.1840
Thence North 32-41-45 West, a distance of 479.4718
Thence North 31-47-25 West, a distance of 557.3641
Thence North 35-29-16 West, a distance of 625.5074
Thence North 57-26-41 West, a distance of 722.0837
Thence North 56-11-52 West, a distance of 920.3187
Thence North 52-01-01 West, a distance of 859.5622
Thence North 43-09-18 West, a distance of 988.3405
Thence North 48-19-27 West, a distance of 1138.6784
Thence North 49-20-55 West, a distance of 892.3305
Thence North 61-42-59 West, a distance of 128.6036
Thence North 61-46-06 West, a distance of 582.4067
Thence North 38-45-39 West, a distance of 608.3563
Thence North 57-50-10 West, a distance of 431.4674
Thence North 54-15-44 West, a distance of 513.7375
Thence North 47-06-09 West, a distance of 284.2715
Thence North 61-17-55 West, a distance of 257.9420
Thence North 69-55-30 West, a distance of 259.6503
Thence North 82-28-31 West, a distance of 422.3874
Thence North 76-33-36 West, a distance of 233.1347
Thence North 73-00-13 West, a distance of 856.5357
Thence North 30-02-19 West, a distance of 344.5967
Thence North 32-29-37 West, a distance of 707.3623
Thence North 37-17-46 West, a distance of 485.6130
Thence North 24-21-08 West, a distance of 500.1906
Thence North 19-14-31 West, a distance of 519.2580
Thence North 09-53-20 East, a distance of 212.5327
Thence North 00-24-37 East, a distance of 296.8196
Thence North 38-14-00 West, a distance of 335.6954
Thence North 89-35-24 West, a distance of 192.1299
Exhibit G – Description of the Water Management Plan Area Thence North 89-35-24 West, a distance of 209.6304
Thence North 55-06-11 West, a distance of 339.1010
Thence North 16-16-08 West, a distance of 182.4945
Thence North 34-35-39 West, a distance of 213.1185
Thence North 64-49-05 West, a distance of 250.1489
Thence North 70-17-53 West, a distance of 370.0374
Thence North 44-34-57 West, a distance of 345.8289
Thence North 16-18-05 West, a distance of 364.7246
Thence North 29-57-57 West, a distance of 587.1073
Thence North 16-16-28 West, a distance of 182.4350
Thence North 38-34-12 East, a distance of 310.9619
Thence North 26-58-53 East, a distance of 507.7685
Thence North 26-02-10 East, a distance of 484.4089
Thence North 28-30-44 East, a distance of 296.9540
Thence North 09-08-31 East, a distance of 229.7301
Thence North 06-25-49 East, a distance of 333.7245
Thence North 09-22-35 East, a distance of 336.0530
Thence North 04-13-57 East, a distance of 262.5279
Thence North 31-34-44 West, a distance of 164.7022
Thence South 45-26-05 West, a distance of 98.9540
Thence South 50-38-19 West, a distance of 136.2910
Thence South 31-20-58 West, a distance of 203.7449
Thence South 20-23-24 West, a distance of 204.5015
Thence South 37-18-31 West, a distance of 174.6797
Thence South 35-56-42 West, a distance of 300.4641
Thence South 30-10-36 West, a distance of 281.7456
Thence South 19-50-56 West, a distance of 314.7618
Thence South 10-42-47 West, a distance of 390.6845
Thence South 56-43-54 West, a distance of 251.9103
Thence South 62-31-10 West, a distance of 335.9003
Thence North 83-15-45 West, a distance of 316.4353
Thence South 67-46-15 West, a distance of 226.9957
Thence South 84-04-56 West, a distance of 316.4363
Thence North 80-51-20 West, a distance of 229.6689
Thence North 66-23-39 West, a distance of 398.4678
Thence North 66-22-50 West, a distance of 665.7744
Thence North 40-11-08 West, a distance of 805.0972
Thence North 55-01-37 West, a distance of 954.6359
Thence North 44-35-45 West, a distance of 419.8105
Thence North 59-05-55 West, a distance of 344.5304
Thence North 42-58-24 West, a distance of 432.4011
Thence North 50-05-14 West, a distance of 384.7675
Thence North 63-02-07 West, a distance of 312.4699
Thence North 64-14-47 West, a distance of 367.0874
Thence South 17-59-39 East, a distance of 110.4651
Thence South 35-50-56 East, a distance of 324.8520
Thence South 32-28-58 East, a distance of 353.7862
Thence South 31-35-51 East, a distance of 329.4689
Thence South 44-35-03 East, a distance of 420.0770
Thence South 41-51-46 East, a distance of 519.2197
Thence South 13-37-56 East, a distance of 287.9879
Thence South 09-35-21 East, a distance of 301.6528
Thence South 05-18-52 East, a distance of 175.4412
Thence South 27-00-57 West, a distance of 117.2299
Thence South 49-48-06 West, a distance of 161.0338
Thence North 89-35-23 West, a distance of 157.1290
Exhibit G – Description of the Water Management Plan Area Thence North 72-13-07 West, a distance of 292.8656
Thence North 38-14-40 West, a distance of 223.5397
Thence North 49-21-21 West, a distance of 1487.2756
Thence North 50-30-26 West, a distance of 154.9607
Thence South 53-10-59 West, a distance of 150.5821
Thence South 54-44-21 West, a distance of 1005.8733
Thence South 55-06-24 West, a distance of 6992.3760
Thence South 54-09-37 West, a distance of 1051.0319
to the True Point of Beginning.
Perimeter: 551741.8300
Area: 2495992473.0343 57300.1027 acres
Mapcheck Closure - (Uses listed courses & COGO Units)
Error of Closure: 0.02737 Thence South 68-46-44 W
Precision 1: 20161685.12
Exhibit H – Judgment and Decree
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
UNITED STATES DISTRICT COURT
CENTRAL DISTRICT OF CALIFORNIA
SOBOBA BAND OF LUISEÑO
INDIANS, a federally recognized
Indian tribe,
Plaintiff,
v.
METROPOLITAN WATER
DISTRICT OF SOUTHERN
CALIFORNIA, a California
metropolitan water district; LAKE
HEMET MUNICIPAL WATER
DISTRICT, a California water
district; the UNITED STATES OF
AMERICA for the benefit of the
Soboba Band of Luiseño Indians,
Defendants,
v.
EASTERN MUNICIPAL WATER
DISTRICT, a California water
district,
Third-Party Defendant.
Case No. 00-04208 GAF (MANx)
Judge: Honorable Gary A. Feess
STIPULATED JUDGMENT
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
JUDGMENT AND DECREE
The Court has considered the Settlement Agreement dated , 2004, which permanently resolves the claims of the Soboba Band of Luiseño Indians, (hereinafter “Soboba Tribe”) and the United States appearing for the benefit of the Soboba Tribe for alleged infringement of its water rights in the San Jacinto River and the Canyon Sub-basin and Intake portion of the Upper Pressure Sub-basin associated therewith (collectively “Basin”) in Riverside County, California, and for damages related to historical interference with the Soboba Tribe’s rights and unauthorized use of its water. A copy of the Settlement Agreement is attached as Exhibit 1 to the Stipulation and Request for Entry of Judgment and Decree.
After consideration of the pleadings and papers filed in this action, the evidence presented by the Parties, and the Stipulation and Request for Entry of Judgment and Decree, it is hereby ORDERED, ADJUDGED AND DECREED:
1. The Settlement Agreement is hereby approved in its entirety, and this Judgment and Decree incorporates the definitions set forth therein. When used in this Judgment and Decree, the term “United States” shall mean the United States of America acting on behalf of the Soboba Tribe, and in no other capacity except as specifically otherwise provided herein.
2. The Soboba Tribe shall have the right to waters beneath the Soboba Indian Reservation, which shall be held in trust by the United States for the benefit of the Soboba Tribe, as follows:
A. The prior and paramount right, superior to all others, to pump 9,000 AFA from the Basin for any use on the Reservation and lands now owned or hereafter acquired by the Soboba Tribe contiguous to the Reservation or within the Basin.
B. The Soboba Tribe’s right to pump a total of 9,000 AFA from the 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
Basin is without regard to whether the water was naturally or artificially recharged.
C. In the event the Soboba Tribe is unable, except for mechanical failure of its wells, pumps or water facilities, to produce from its existing wells or equivalent replacements up to 3,000 AFA production from the Canyon Sub-basin and the remainder of its Tribal Water Right from the Intake Sub-basin, Eastern Municipal Water District and Lake Hemet Municipal Water District (“the Local Districts”) shall deliver any shortage to the Soboba Tribe. Any shortage shall be delivered at such locations as the Soboba Tribe and the Local Districts may agree, or if there is no agreement, at the wellheads where the shortage occurred. Such water may be supplied from Local District wells in either the Canyon or Intake Sub-basins, or from other sources. For any water delivered pursuant to this paragraph, the Soboba Tribe shall pay an acre-foot charge equal to its then current cost of production, and any avoided cost of treatment, from the wells where the shortage occurred, assuming pumping lifts equal to the Soboba Tribe’s averages in the respective Sub-basins over the preceding ten years.
3. Beginning on the Effective Date of the Settlement Agreement, the Soboba Tribe’s right to pump groundwater in the exercise of its Tribal Water Right shall be subject to the following provisions:
A. The Soboba Tribe agrees to limit its exercise of the Tribal Water Right to 4,100 acre-feet annually, for a period of fifty (50) years commencing with the Effective Date of the Settlement Agreement, according to the schedule set forth in Exhibit F of the Settlement Agreement. Should the Soboba Tribe during that period identify a need for water in addition to the Schedule set forth in Exhibit F, the Soboba Tribe shall have the right to purchase water from the Water Management Plan at the rate then being charged to the Water Management Plan’s municipal producers.
B. Any use of the Tribal Water Right by an individual member of the 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
Soboba Tribe shall be satisfied out of the water resources provided to the Soboba Tribe in the Settlement Agreement and this Judgment and Decree.
4. The foregoing rights are in full satisfaction of all of the Soboba Tribe’s claims as provided in Article 5 of the Settlement Agreement.
5. This Court retains jurisdiction over this matter and the Parties for the limited and sole purpose of interpretation and enforcement of this Judgment and Decree and the Settlement Agreement.
6. The Action shall be transferred to the United States District Court, Central District of California, Eastern Division.
7. Except as may be included in the payments contemplated by the Settlement Agreement, no Party shall recover any attorney’s fees or costs from any other Party.
8. The Parties have waived their rights to appeal, and therefore, this Judgment and Decree shall become final and nonappealable as of the date it is entered. This Judgment and Decree shall become enforceable as of the date the United States Secretary of the Interior causes to be published in the Federal Register a statement of findings that all actions necessary to make the settlement effective have been completed, as required by Section 10 of the Soboba Band of Luiseño Indians Settlement Act, Public Law ______.
Dated: _______________, 200 ______________________________ United States District Court Judge
Exhibit I – Soboba Tribe’s Water Development Schedule
SETTLEMENT YEARS
(FROM EFFECTIVE DATE)
MAXIMUM TRIBAL USAGE
(AFA)
1 – 5 2900
6 – 10 3215
11 – 15 3520
16 – 20 3825
21 – 25 4010
26 – 30 4020
31 – 35 4025
36 – 40 4040
41 – 45 4075
46 – 50 4100
Exhibit J – Description of EMWD Property
Parcel 1:
The North half of the Northwest quarter of Section 34 in Township 5 South, Range 2 West, San Bernardino Meridian, in the County of Riverside, State of California, according to the Official Plat thereof;
Excepting therefrom the Westerly 30 feet for road purposes as conveyed to the County of Riverside, by Deed recorded November 13, 1929 in Book 722 page 447 of Deeds, Riverside County Records;
Also excepting therefrom that portion conveyed to the County of Riverside, for road purposes, by Deed filed for record January 18, 1949 as Instrument No. 1917, Official Records.
Also except that portion conveyed to Riverside County Flood Control and Water Conservation District by Grant Deed recorded May 13, 1987 as Instrument No. 133741, Official Records.
Also except that portion conveyed to the Metropolitan Water District of Southern California, a public corporation, by Grant Deed recorded July 22, 1994 as Instrument No. 291698, Official Records.
Also except that portion conveyed to the Metropolitan Water District of Southern California by Grant Deed recorded July 22, 1994 as Instrument No. 291699, Official Records.
Also except that portion conveyed to the Metropolitan Water District of Southern California, a public corporation by Grant Deed recorded January 30, 1997 as Instrument No. 32920, Official Records.
Parcel 2:
The South half of the Northwest quarter of Section 34, Township 5 South,.Range 2 East, San Bernardino Meridian, in the County of Riverside, State of California, according to the Official Plat thereof.
Except that portion conveyed to the County of Riverside, by deed recorded April 26, 1949 in Book 1071, Page 392, Official Records.
Also except that portion conveyed to the Metropolitan Water District of Southern California, a public corporation, by Grant Deed recorded July 22, 1994 as Instrument No. 291698, Official Records.
Also except that portion conveyed to the Metropolitan Water District of Southern California, a public corporation by Grant Deed recorded January 30, 1997 as Instrument No. 32920, Official Records.
Also except that portion conveyed to the Metropolitan Water District of Southern California, a public corporation, by Grant Deed recorded May 5, 1997 as Instrument No. 154365, Official Records.
Exhibit K - Description of MWD Property
Exhibit L – Description of LHMWD Property
Portions of Lots 3, 4 and 5 of Fairview Tract, as shown on the plat in San Diego Map Book 006, page 307, in Riverside County, California, comprising 11.57 acres more or less.
3 2 4
5 29
31 32 33 34
10 28
6 20
28 21
MOUNTAIN AVE
SOBOBA RD
RAMONA EXWY
FAIRVIEW AVE
N SOBOBA ST
E MAIN ST
E ESPLANADE AVE
ESHAVER ST
CEDAR AVE
01 Miles
Exhibit M - Map of Potential Soboba Reservation Lands for Habitat Preservation and /or Environmental Mitigation
T.4.S R.1.E
T.5.S R.1.E
APPENDIX B STIPULATED JUDGMENT
Hemet/San Jacinto Groundwater Management Area
Water Management Plan
APPENDIX C LIST OF GOVERNING BODIES
Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Appendix C. List of Governing Bodies
Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Eastern Municipal Water District:
Name Title
David J. Slawson Board President, Division 5
Ronald Sullivan Board Vice President, Division 4
Joe Kuebler, CPA Director Division 2, EMWD Board
Treasurer
Philip E. Paule Director Division 1
Randy A. Record Director Division 3, MWD Director
Lake Hemet Municipal Water District:
Name Title
Frank Douglas Marshall III Board President
Patrick Searl Board Vice President
Herbert C. Forst Board Secretary
John S. Fricker Board Treasurer
Larry Minor Director
City of Hemet:
Name Title
Marc Searl Mayor
Lori Van Arsdale Vice- Mayor
C. Robin Resser Lowe Councilperson
Brian Christie Councilperson
Eric Mc Bride Councilperson
Steve Clayton City Clerk
Judith Oltman City Treasurer
City of San Jacinto:
Name Title
Jim Ayres Mayor
Chris Carlson Vice- Mayor
Dale Stubblefield Council Member
Robert Ritchie Council Member
John Mansperger Council Member
APPENDIX D PRINCIPLES FOR WATER MANAGEMENT
Hemet/San Jacinto Groundwater Management Area
Water Management Plan
RVLIT\GT\654952.1 -1-
PRINCIPLES FOR WATER MANAGEMENT
1. Water Management Plan. These Principles, approved by the appropriate authority of each party, are intended to form the basis from which the parties will develop a Water Management Plan (“Management Plan”) for the area described in Section 2. The Management Plan is being developed to ensure an adequate and reliable source of future water supply.
The Management Plan is also intended to facilitate and accommodate a settlement of the claims of the Soboba Band of Luiseno Indians (“Soboba Tribe”).
2. Management Area. The area included in the Management Plan consists of the Canyon Sub-basin and the San Jacinto Upper Pressure Subbasin, downstream to Bridge Street, and the Hemet Basins (“Management Area”). The Management Area is shown upon the attached map.
3. Pumpers within the Management Area. The primary pumpers within the Management Area are: Eastern Municipal Water District (“Eastern”), Lake Hemet Municipal Water District (“Lake Hemet”), City of San Jacinto (“San Jacinto”), and City of Hemet (“Hemet”) (individually RVLIT\GT\654952.1 -2-
“Public Agency,” collectively “Public Agencies”); the Soboba Tribe (not a Management Plan participant); and approximately 62 individual agricultural and other private pumpers who pump more than 25 acre-feet per year (“Private Pumpers”).
4. Goals. The parties agree that the Management Plan shall incorporate and serve to implement the following goals:
A. Allowing for Future Urban Growth. The parties
acknowledge that the Management Area will continue to experience residential, commercial, and industrial growth and development, and that existing water production and service systems will need to be expanded to meet this growth. It is estimated that at least 15,000 afy incremental water supply capacity over the existing base production rights of the Public Agencies must be dedicated to adequately serve this growth. The Management Plan should serve and provide a clear planning process so that each affected Public Agency will be able to meet these projected growth needs.
RVLIT\GT\654952.1 -3-
B. Water Quality Protection. Implementation of the
Management Plan should protect and/or enhance Management Area water quality. However, implementation of certain elements of the Management Plan may cause limited localized water quality degradation. If such degradation impedes the then current beneficial use of any Public Agency in the Management Area, the Watermaster described in Section 22 (“Watermaster”) shall implement appropriate mitigation measures to ensure water supply to the affected Public Agency and bear the associated costs.
The standards for local water quality degradation shall be defined in the Management Plan.
C. Cost-Effective Management. The Management Plan
should serve to support the pursuit of cost-effective water supply and water treatment by the Public Agencies, both individually and collectively.
D. Overdraft. The groundwater levels within the
Management Area have generally been declining for a number of years, and the Management Area is presently in a condition of overdraft. It is recognized that the Management Plan will, within a reasonable period, eliminate groundwater overdraft and enhance operational yield by RVLIT\GT\654952.1 -4-
implementing a combination of available water resources management elements. These elements include: reduction in native groundwater production; enhanced recharge with native, imported and/or recycled water; development of supplemental supplies such as imported and recycled water; and water conservation programs.
E. Monitoring. The Watermaster shall implement a
monitoring program to ensure the Management Plan activities follow best management and engineering principles to protect Management Area water resources.
5. Public Agencies Base Production Rights.
A. The base production rights of Eastern, Lake Hemet and Hemet in the first year of the Management Plan shall be based upon their average production for calendar years 1995-1999. This period was chosen to reflect these Public Agencies’ recent pumping, and shall determine their base production rights.
RVLIT\GT\654952.1 -5-
B. The base production right of San Jacinto in the first year of the Management Plan, shall be based upon its average production for calendar years 1995-1999, plus 500 afy. The 500 afy is added because San Jacinto’s recent production does not reflect its historic production because of water purchases and other factors.
C. Pursuant to Section 21 below, for the life of the
Management Plan, Hemet and San Jacinto shall each add an additional 900 afy to their base production rights. The additional 900 afy shall not be subject to reduction by the Watermaster as provided in Section 5.D and shall not be subject to any Administrative or Replenishment Assessments as provided in Section 6, or other fee or charge imposed under the Management Plan.
D. It is the goal of the Management Plan to adjust base production rights over time to a level consistent with the Watermaster’s calculation of the Public Agencies' share of safe yield for the Management Area. Based on current information, it appears that the total reduction in base production rights will need to be approximately 35%. The ultimate reduction will be based on periodic demand, hydrology, recharge and RVLIT\GT\654952.1 -6-
availability of imported water. In order to implement this reduction in a phased manner, each Public Agency's base production rights shall be subject to adjustment as follows:
(1) A 10% reduction from the base production rights
in the first year of the Management Plan; and
(2) Until base production rights are consistent with the Public Agencies’ share of safe yield, Watermaster shall determine the reductions in base production rights in each subsequent year of the Management Plan, to achieve this goal within 6 years of approval of the Management Plan. Each reduction shall not be more than 10% of the base production right of the prior year.
(3) Pursuant to Section 7(A)(2)(b), upon conversion of
a Class B Participant's land from agricultural to a use that requires water service from a Public Agency, the Public Agency shall receive an increase in its base production rights equal to the adjusted base production right of the Class B Participant.
RVLIT\GT\654952.1 -7-
6. Public Agency Production Assessments. The Public Agency production will be subject to the following assessments:
A. An Administrative Assessment on each acre-foot pumped by a Public Agency up to its adjusted base production right. The parties contemplate that the Administrative Assessment will be $50.00 per acre-foot of water pumped in the first year of the Management Plan, and that such amount will thereafter be set by the Watermaster.
B. A Replenishment Assessment on each acre-foot pumped
by a Public Agency in excess of its adjusted base production right equal to the cost of providing a like quantity of supplemental water to recharge the Management Area, including recharge losses. Pumping by a Public Agency in excess of its adjusted base production right in order to meet increasing demands is expected and permissible, provided that such excess extractions shall be subject to the Replenishment Assessment. The costs of providing a like quantity of supplemental water shall include the costs of water, O&M costs of the replenishment system, capital recovery and other administrative costs. Currently, the total of these cost items is estimated to be in the range RVLIT\GT\654952.1 -8-
of $300 to $400 per acre-feet; the actual amount will reflect the costs at the time incurred.
7. Private Pumpers Water Rights. The Public Agencies recognize the overlying water rights of the Private Pumpers, and do not intend to take or adversely impact these rights without an agreement with the owner of such rights. The Management Plan will lay out alternatives for the retention, protection, or transfer of such rights, leaving selection of the alternative to the individual overlying water rights owner. A Private Pumper can elect not to participate in the Management Plan and not to formally acknowledge its existence. Such Pumpers shall be referred to herein as “Non-Participants”; such Pumpers shall continue to exercise whatever water rights they may hold under California law unaffected by the Management Plan. There is no intent to affect water use that is consistent with the historical use of the Private Pumpers. However, other pumpers under the Management Plan do not waive their rights to challenge new or expanded water rights. NonParticipants will not have the option of joining the program at a later date.
The alternatives available to participants are as follows:
RVLIT\GT\654952.1 -9-
A. (1) Class A Participation. A Private Pumper can elect to sign a written agreement acknowledging the existence of the Management Plan. Such Pumper shall be a Class A Participant and shall be entitled to vote for and/or be elected to serve as the Private Pumper representative on the Management Plan’s governing board or body described in Paragraph 22 below, but shall not otherwise be required to participate in the Management Plan implementation. A Class A Participant may, without any financial assessment by the Watermaster, pump from his/her/its property within the Management Area the amount of water that can be put to reasonable and beneficial use on the Pumper’s land as may be authorized under California law. Class A Participants shall have the right to convert to Class B Participation during a grace period that shall end three (3) years after the effective date of the Management Plan, as approved by a judgment of the Superior Court for Riverside County, upon payment of the total assessments the Pumper would have paid had the Pumper elected to be a member of Class B from the outset, plus interest.
(2) Class B Participation. A Private Pumper can
become a Class B Participant by electing to limit annual pumping to the Pumper’s average annual production during the calendar years 1995 through RVLIT\GT\654952.1 -10-
1999 and to pay replenishment assessments on amounts in excess of that average annual production. A Class B Participant shall enjoy the following benefits of Plan Participation:
a. Vote for and/or be elected to serve as the
Private Pumper’s representative on the Management Plan’s Governing Board;
b. Upon conversion of Pumper’s land from
agricultural use to a use that requires water service from a participating Public Agency, Public Agency shall credit to the extent legally permissible, Pumper or Pumper’s successor-in-interest’s adjusted production right, using the formula in Section 5 towards satisfaction of any requirement then in effect for water supply assessment requirements. Furthermore, Pumper or Pumper’s successor-in-interest shall be given a credit for Pumper’s adjusted production right using the formula in Section 5 towards any fees associated with water supply that the Public Agency may then have in effect. The Public Agency serving the converted land shall receive a credit to its production right as set forth in Section 5.
RVLIT\GT\654952.1 -11-
c. To the extent the Pumper’s land is not
covered under Section 7(A)(2)(b), Pumper will be eligible to enter into a contract with the Management Plan, or a participating Public Agency, to sell for a defined period of time some portion of Pumper’s adjusted production right, under terms and conditions mutually agreed upon by the Pumper and the Management Plan. Criteria used in consideration of such contract shall include:
(i) Management Plan’s need to acquire
additional water supplies to address Basin overdraft and recovery; (ii) Submission of a water conservation
plan, including use of in lieu water, by Pumper that will reasonably guarantee conservation of water that would otherwise be produced from the Basin;
(iii) Public policy considerations of local
government jurisdictions, including economic and land
use impacts of proposed water conservation plan.
RVLIT\GT\654952.1 -12-
B. In-Lieu Water Use. In the event a Private Pumper (or successor) receives recycled and/or imported water from a Public Agency to serve an overlying use in place of groundwater, or otherwise engages in an in-lieu program, the overlying water right of the Private Pumper (or successor) shall not be diminished by the receipt and use of such recycled and/or imported water or by engaging in an in-lieu program.
C. Well Monitoring. To become a Class A or B Participant, a Private Pumper shall authorize the metering of the Pumper’s well(s) and the collection of groundwater level and quality data, and the reading thereof by Management Plan personnel. The metering and reading shall be at no cost to the Pumper, and the Pumper shall receive copies of the reports and information obtained upon request.
D. Future Production Participation. Any new Pumper after the effective date of the Management Plan, as approved by a judgment of the Superior Court for Riverside County, can only participate as a Class A Participant as described in Section 7A(1).
RVLIT\GT\654952.1 -13-
E. Replacement Wells. The redrilling of existing wells and the drilling of new wells to replace existing wells will not be considered new private production.
8. Capital Facilities. Each Public Agency shall continue to own its existing capital facilities for water management. However, capital facilities may be jointly constructed and owned by the Management Plan.
Joint financing of such facilities may be funded by regional capital fees, loans and grants, contributions for storage by The Metropolitan Water District of Southern California (“Metropolitan”) or other third-parties, and municipal bonds. Responsibility for the costs of any existing and future capital facility of the Management Plan should be apportioned among the Public Agencies based on relative benefit to be derived by each Public Agency. Any of the participating Public Agencies may propose projects to be included in the Management Plan to increase Management Area water supply. Such proposals, after evaluation by the Watermaster, shall be included or rejected. If the Watermaster chooses to reject the proposal, the proposing Public Agency may implement the rejected project as long as it does not significantly impact the implementation of the Management Plan and/or interfere with the ongoing production by the Public Agencies.
RVLIT\GT\654952.1 -14-
9. Soboba Tribe’s Water Rights. The Soboba Tribe’s water rights shall be determined as part of a settlement among the Soboba Tribe, the United States, Eastern, Lake Hemet and Metropolitan. Major points of the proposed settlement are:
A. The Soboba Tribe shall have a senior, prior right in the Canyon and San Jacinto Upper Pressure Sub-basins of 9000 afy, but its use shall be limited to a maximum of 4100 afy during the first 50 years after the effective date of the settlement.
B. The Soboba Tribe shall have the right to purchase
replenishment water for use pursuant to the Principles of Settlement at the Management Plan replenishment rate.
C. The Soboba settlement provides that, among other things, Metropolitan will use its best efforts to deliver sufficient water to yield a 15- year average of 7,500 afy to the Management Plan until 2035 at its longterm interruptible rate (currently $233/af).
RVLIT\GT\654952.1 -15-
D. Subject to full funding of the settlement by the United States, the Management Plan shall pay the Soboba Tribe $10 million.
E. The Management Plan will also pay the Soboba Tribe $7 million. A Public Agency's payment of its share of this amount is optional, but in order to obtain the benefits of the low-cost Metropolitan water delivered pursuant to the settlement, a Public Agency shall pay its share of this amount.
F. The Management Plan will receive $10 million for
capital improvements from the United States, and all unused Soboba Tribe water based on the Public Agency's participation in the payment in Section 9(E) above.
10. Implementation of These Principles. These Interim Principles for Water Management shall be used by the parties as a basis for the preparation of the Management Plan, and a stipulated judgment in a water rights adjudication. As explained below, the Management Plan shall be administered by the Watermaster. The Watermaster will be under the continuing jurisdiction of the Court.
RVLIT\GT\654952.1 -16-
11. Assessment Program. The assessment program contemplated by the Management Plan shall be administered by the Watermaster subject to the governance provisions herein. All payments shall be made to the Watermaster and shall be maintained in a separate restricted fund. All assessments shall be used exclusively to acquire imported, recycled or Metropolitan water for the recharge of the Management Area, and for the facilities and operational and administrative expenses associated with the assessment and recharge programs. Subject to Management Plan approval, assessments may also be used by affected parties to acquire and deliver water for direct use by the parties, in lieu of pumping.
12. Replenishment Program. The replenishment program
contemplated by the Management Plan shall also be administered by the Watermaster. The program shall include: the acquisition of supplemental water supplies (including imported, recycled and Soboba Tribe water); the expenditure of assessments; the recharge of the Management Area; and the construction and operation of all necessary facilities, including but not limited to, development of surface and sub-surface percolation and injection facilities. Priority for replenishment will be based on an equitable RVLIT\GT\654952.1 -17-
apportionment of available replenishment water among the sub-basins after full consideration of: the Public Agency's participation in the payment in Section 9(E) above; the Management Area conditions; water demands; the availability of storage capacity to accommodate the recharge of natural flows; the availability of appropriate conveyance facilities; and the availability of replenishment or imported water. The Watermaster is encouraged to take advantage of surplus imported water that occasionally may be available at low cost, and to use available assessment funds to bank such recharge against future pumping in excess of adjusted production rights.
13. Rights to Groundwater. Groundwater in the Management Area may occur from: natural recharge; spreading operations of natural flows; replenishment with imported, recycled or Metropolitan water acquired with assessment funds; or in-lieu recharge programs financed with assessment funds. All such groundwater shall be available to support the pumping of the parties as allowed herein, and shall not be the property of any individual party, subject to the provisions of Section 14.
RVLIT\GT\654952.1 -18-
14. Storage Rights. The parties recognize that unused storage capacity exists in the Management Area, and the Management Plan contemplates that this capacity will be managed conjunctively with available imported and recycled water supplies. Subject to availability of the Management Plan fund for assessments and unused storage capacity as determined by Watermaster, the Management Area will be recharged and water stored therein when such supplies are available, and drawn upon by the Public Agencies in dry years when such supplemental water supplies may not be available. In addition, unused storage capacity as determined by Watermaster may be used for “put and take” operations of recycled or imported water that is paid for by any party to the Management Plan provided that:
A. Such operations do not interfere with the rights of any other pumper, or with the use of the storage capacity for recharge and storage under the Management Plan;
B. Water available for recharge is purchased first, as
needed, for the Management Plan;
RVLIT\GT\654952.1 -19-
C. Later recovery of stored water shall exclude losses; and D. Such recovered water may be used anywhere within the service area of the party.
Any conjunctive use programs for the benefit of territory outside of the Management Area shall be subject to the governance provisions herein. Any storage, conjunctive use programs by third parties or in-lieu recharge programs financed with assessment funds shall be subject to the governance provisions herein.
15. Spreading Operations. The Public Agencies shall
independently or jointly operate their respective facilities to maximize the existing spreading and recharge operations of natural flow in the Management Area.
16. Recharge Water Quality. Consistent with Section 4(E) above all water used to replenish any sub-basin in the Management Area shall meet the Regional Water Quality Control Board requirements, and may be used in any sub-basin where such requirements are met.
RVLIT\GT\654952.1 -20-
17. Recharge Losses. The accounting for storage recharge of the Management Area shall not include any water that escapes therefrom and migrates downstream beyond the Management Area. Losses will be calculated based upon best engineering principles.
18. Recycled Water. The use of recycled water can be of substantial benefit in providing additional water in the Management Area.
Each Public Agency may implement a recycled water program, including the ownership, operation and construction of all necessary facilities, and the application for and administration of any loan or grant applications. The Management Plan will support loan or grant applications, and the Public Agencies will work to integrate recycled water into the Management Plan to the extent economically feasible while meeting regulatory standards.
Subject to existing recycled water contracts, the Management Plan will have a first right of refusal to purchase excess recycled water for recharge.
Priority shall be given to Management Area recharge for the use of recycled water which originates therefrom.
19. Export. The Public Agencies may export water outside the Management Area, on a temporary basis, upon approval by the Watermaster.
RVLIT\GT\654952.1 -21-
However, any water exported shall be replenished with an appropriate amount of similar or better quality water as determined by Watermaster.
Also, water exports by the Public Agencies shall not interfere with the Management Plan or any other Public Agency's operations. The Management Plan will set forth the specific criteria for the export of water, including, but not limited to, conjunctive use programs.
20. Credits. Recharge credits documented before the Management Plan shall be calculated pursuant to the Management Plan. Future recharge credits shall be established by replenishment of water or by not exercising the full, adjusted base production right, and shall be calculated pursuant to the Management Plan.
21. Tunnel Seepage, Stream Diversions, Fruitvale To resolve Eastern’s use of Tunnel seepage, Lake Hemet’s stream diversions and Eastern’s use of Fruitvale water, 900 afy shall be added to Hemet’s adjusted base production and 900 afy shall be added to San Jacinto’s adjusted base production right as discussed in Section 5 above. This is intended to provide Hemet and San Jacinto a fair share of water from these disputed issues.
RVLIT\GT\654952.1 -22-
22. Governance. The Management Plan will be administered by a Watermaster as follows:
A. The governing board of the Watermaster shall consist of one elected official from each of the Public Agencies and one Private Pumper representative selected by the Private Pumpers who participate in the Management Plan. Each member shall have one vote.
B. The Watermaster’s duties shall include: determining safe yield; determining replenishment needs; determining annual adjusted base production rights; purchasing and selling imported and recycled water; constructing future capital facilities; establishing assessment rates; initiating necessary conservation and drought management measures; and implementing other responsibilities identified in the Management Plan documents.
Dated: ______, 2004. EASTERN MUNICIPAL WATER
DISTRICT
By: ___________________________
RVLIT\GT\654952.1 -23-
Dated: ______, 2004. LAKE HEMET MUNICIPAL WATER
DISTRICT
By: ___________________________
Dated: ______, 2004. CITY OF HEMET
By: ___________________________
Dated: ______, 2004. CITY OF SAN JACINTO
By: ___________________________
DIAMOND VALLEY LAKE
HWY 79
RAMONA EXPWY
HWY 79
HWY 74
HWY 79
STATE ST.
DOMENIGONI PKWY
HWY 74
3 2 1
10 11
12 3 2 1 6 5 4
7 8
9 10 11 12
14 13
24 6 5
7 8
3 2 1 6 5 4
7 8
9 10 11 12
13 18 17 16 15 14
19 20 21 22 23 24
29 28 27 26 25 30
31 32 33 34 35 36
1 3 2 6 5 4
7 8 9 10 11 12
18 17 16 15 14 13
19 20 21 22 23 24
29 28 27 26 25 30
31 32 33 34 35 36
3 2 1
10 11 12
15 14 13
22 23 24
27 26 25
34 35 36
3 2 1
10 11 12
13 15 14
22 23 24
27 26 25
34 35 36
6 5 4
7 8
9 10 11 12
17 16 15 14 13
18 19
20 21
23 24
29 28 27 26 25 30
31 32 33 34 35
18 19
20 21 22
30 29 28 27
31 32 33 34
31 32 34 35 36 33
22 36
18 17 16
21 19 20
30 29 28
UPPER
CANYON
JACINTO
SAN
HEMET
PRESSURE
NORTH
1”=12,500’
05-29-2003
T.5S. R.1W.
T.4S. R.1W.
T.5S. R.2W.
T.4S. R.2W.
T.5S. R.3W.
T.4S. R.3W.
0 12,500’ 25,000’
MANAGEMENT AREA
APPENDIX E LIST OF COMMITTEE ATTENDEES
Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Appendix E. List of Committee Attendees
Hemet/San Jacinto Groundwater Management Area
Water Management Plan
The attendees of the PC who contributed to this plan:
Name Title Affiliation
Debi Lara Administrative Assistant City of Hemet
Marc Searl Member, City Council City of Hemet
Steve Temple City Manager City of Hemet
Eric Vail Attorney City of Hemet
Lori VanArsdale Member, City Council City of Hemet
Dennis Williams Consultant City of Hemet
Chris Carlson-Buydos Member, City Council City of San Jacinto Bob Hargreaves Attorney City of San Jacinto
Steven Johnson Consultant City of San Jacinto
Barry McClellan City Manager City of San Jacinto
Ken Shaw Member, City Council City of San Jacinto
Samson Haile-Selassie Project Manager DWR
Eric Hong Project Manager DWR
Dale Schafer Facilitator DWR
Ali Taghavi Consultant DWR
Mike Garner Asst. General Manager EMWD
Richard Hall Member, BOD EMWD
Behrooz Mortazavi Asst. General Manager EMWD
Tony Pack General Manager EMWD
Ravi Ravishanker Deputy General Manager EMWD
Gerry Shoaf Attorney EMWD
Rodger Siems Member, BOD EMWD
Herb Forst Member, BOD LHMWD
John Fricker Member, BOD LHMWD
Rob Lindquist General Manager LHMWD
Art Littleworth Attorney LHMWD
John Loncar Consultant LHMWD
Tom Wagoner General Manager LHMWD
Bruce Scott Private Water Producer Private Water Producer Jim Conner Private Water Producer Private Water Producer Bill Corwin Private Water Producer Private Water Producer Gary McMillan Private Water Producer Private Water Producer Randy Record Private Water Producer Private Water Producer Joe Garcia Environmental Specialist Soboba Tribe
Appendix E. List of Committee Attendees
Hemet/San Jacinto Groundwater Management Area
Water Management Plan
The members of the TC who contributed to this plan:
Name Title Affiliation
Mike Gow Director of Public Works City of Hemet
Dennis Williams Consultant City of Hemet
Steve Johnson Consultant City of San Jacinto
Maurice Hall Project Manager DWR
Eric Hong Project Manager DWR
Dale Schafer Facilitator DWR
Ali Taghavi Consultant DWR
Khos Ghaderi Director of Operations EMWD
Joe Lewis Director of Engineering Svcs. EMWD
Fahkri Manghi Hydrologist EMWD
Behrooz Mortazavi Asst. General Manager EMWD
Peter Odencrans Public Affairs Officer EMWD
Ralph Phraner Senior Geologist EMWD
Ravi Ravishanker Deputy General Manager EMWD
John Loncar Consultant LHMWD
Tom Wagoner General Manager LHMWD
Dick Kelley Private Water Producer Private Water Producer Bruce Scott Private Water Producer Private Water Producers Joe Garcia Environmental Specialist Soboba Tribe
Peter Pyle Consultant Soboba Tribe
Appendix E. List of Committee Attendees
Hemet/San Jacinto Groundwater Management Area
Water Management Plan
The representatives of each Public Agency and DWR at CAM Committee meetings who contributed to this plan:
Name Title Affiliation
Steve Temple City Manager City of Hemet
Eric Vail Attorney City of Hemet
Dennis Williams Consultant City of Hemet
Bob Hargreaves Attorney City of San Jacinto
Steve Johnson Consultant City of San Jacinto
Barry McClellan City Manager City of San Jacinto
Samson Haile-Selassie Project Manager DWR
Eric Hong Project Manager DWR
Dale Schafer Facilitator DWR
Ali Taghavi Consultant DWR
Mike Garner Asst. General Manager EMWD
Behrooz Mortazavi Asst. General Manager EMWD
Tony Pack General Manager EMWD
Chuck Rathbone Director of Finance EMWD
Gerry Shoaf Attorney EMWD
Art Littleworth Attorney LHMWD
John Loncar Consultant LHMWD
Tom Wagoner General Manager LHMWD
APPENDIX F HISTORICAL WATER SUPPLIES
LHMWD SURFACE WATER DIVERSION
EMWD IMPORTED WATER USAGE
EMWD RECYCLED WATER PRODUCTION
EMWD RECYCLED WATER SALES
Hemet/San Jacinto Groundwater Management Area
Water Management Plan
EMWD
Historical Water Supply Components (AF)
Year Groundwater* Imports Recycled
Water**
Sales to other
Agencies
Conveyance
Water Total
1984 11,763 2,228 0 (1,811) 0 12,181
1985 11,859 971 0 (2,301) 0 10,529
1986 11,605 605 0 (1,750) 0 10,460
1987 12,217 2,889 37 (3,549) 0 11,594
1988 14,539 4,463 42 (2,929) 0 16,116
1989 14,762 5,712 40 (4,500) 0 16,014
1990 16,533 5,774 24 (8,417) 0 13,915
1991 12,051 378 24 (2,667) 0 9,786
1992 11,810 92 25 (2,149) 0 9,778
1993 10,483 0 1 (155) 0 10,329
1994 12,253 0 0 (1,823) 0 10,430
1995 11,055 50 7 (707) 0 10,406
1996 16,349 0 57 (1,902) (2,583) 11,921
1997 16,282 183 31 (1,133) (3,120) 12,242
1998 14,692 0 4 (417) (3,656) 10,623
1999 17,458 0 0 (1,658) (3,130) 12,670
2000 17,634 198 0 (2,236) (2,690) 12,906
2001 15,127 1,761 0 (2,853) (907) 13,128
2002 15,370 0 0 (4,895) (929) 9,546
2003 13,693 325 0 (1,864) (686) 11,468
2004 12,515 5,636 0 (4,283) 0 13,868
* Groundwater includes conveyance water
** Recycled water does not include water sold to land owners for irrigation LHMWD
Historical Water Supply Components (AF)
Year Groundwater Purchases
from EMWD
Surface
Water Total
1984 4,901 1811 * *
1985 6,609 2074 6,557 15,241
1986 6,961 1750 6,078 14,789
1987 6,929 3396 4,418 14,743
1988 7,427 2792 6,424 16,642
1989 6,481 4338 6,837 17,656
1990 5,829 8382 1,902 16,114
1991 7,559 2300 2,057 11,917
1992 7,770 2149 2,206 12,125
1993 6,748 155 6,064 12,967
1994 9,780 1820 1,633 13,233
1995 9,166 653 4,328 14,146
1996 10,932 1841 3,359 16,132
1997 12,472 507 2,959 15,938
1998 9,356 266 4,019 13,641
1999 13,390 952 3,033 17,375
2000 13,093 1808 1,765 16,666
2001 12,490 2103 1,348 15,941
2002 12,595 4100 441 17,136
2003 12,044 1343 1,530 14,918
2004 11,900 3635 1,330 16,865
* Surface water data unavailable for 1984
City of Hemet Water Service Area
Historical Water Supply Components (AF)
Year Groundwater Purchases
from EMWD Total
1984 3,514 0 3,514
1985 3,810 227 4,037
1986 5,531 0 5,531
1987 4,669 153 4,822
1988 6,306 137 6,443
1989 6,549 162 6,711
1990 5,776 35 5,811
1991 5,138 367 5,505
1992 5,597 0 5,597
1993 5,478 0 5,478
1994 5,327 3 5,330
1995 5,643 1 5,644
1996 5,961 14 5,975
1997 5,891 27 5,918
1998 4,801 31 4,832
1999 4,805 642 5,447
2000 5,048 428 5,476
2001 4,735 749 5,484
2002 4,955 761 5,716
2003 4,999 518 5,517
2004 5,684 345 6,029
City of San Jacinto Water Service Area
Historical Water Supply Components (AF)
Year Groundwater Purchases
from EMWD Total
1984 2,805 0 2,805
1985 2,840 0 2,840
1986 2,763 0 2,763
1987 2,746 0 2,746
1988 2,980 0 2,980
1989 2,662 0 2,662
1990 3,841 0 3,841
1991 3,051 0 3,051
1992 3,481 0 3,481
1993 2,802 0 2,802
1994 2,793 0 2,793
1995 2,637 54 2,691
1996 2,831 47 2,878
1997 2,337 600 2,937
1998 2,585 120 2,705
1999 2,766 65 2,831
2000 2,780 0 2,780
2001 2,742 1 2,743
2002 3,231 34 3,265
2003 3,154 2 3,156
2004 2,794 303 3,097
Private Water Producers
Historical Water Supply Components (AF)
Year Groundwater Recycled
Water Total
1984 27,420 2086 29,506
1985 30,465 4076 34,541
1986 29,317 4480 33,797
1987 28,512 4461 32,973
1988 27,933 5010 32,943
1989 27,390 5571 32,961
1990 24,725 4439 29,164
1991 23,894 3688 27,582
1992 23,904 3076 26,980
1993 26,130 3301 29,431
1994 30,777 2416 33,193
1995 28,777 3847 32,624
1996 27,216 4312 31,528
1997 28,566 4507 33,073
1998 27,630 3926 31,556
1999 29,358 4975 34,333
2000 33,123 4596 37,719
2001 28,678 4319 32,997
2002 19,962 4888 24,850
2003 15,465 3898 19,363
2004 17,179 5047 22,226
Soboba Tribe
Historical Water Supply Components (AF)
Year Groundwater Total
1984 398 398
1985 948 948
1986 912 912
1987 450 450
1988 450 450
1989 450 450
1990 450 450
1991 450 450
1992 450 450
1993 450 450
1994 246 246
1995 951 951
1996 1,324 1,324
1997 1,190 1,190
1998 1,000 1,000
1999 1,545 1,545
2000 1,321 1,321
2001 1,536 1,536
2002 2,016 2,016
2003 1,773 1,773
2004 1,315 1,315
APPENDIX G EMWD LICENSE FOR
SAN JACINTO RIVER DIVERSION
Hemet/San Jacinto Groundwater Management Area
Water Management Plan
APPENDIX H MEMORANDA OF UNDERSTANDING
APPENDIX H1: PREPARATION OF WATER MANAGEMENT PLAN
APPENDIX H2: DRAFT AGREEMENT REGARDING PHASE 1 FACILITIES
CONSTRUCTION COST AND USE
APPENDIX H3: MONITORING PROGRAM
APPENDIX H4: INTERIM WATER SUPPLY PLAN
Hemet/San Jacinto Groundwater Management Area
Water Management Plan
APPENDIX I SB1938 GROUNDWATER MANAGEMENT
PLAN COMPLIANCE CHECKLIST
Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Water Management Plan GWMP Components
Description Section(s)
SB 1938 Mandatory Components
1. Documentation of public involvement 2.2.4, 11.10
2. BMO(s) 3.1
3. Monitoring and management of groundwater elevations, groundwater quality, inelastic land subsidence, and changes in surface water flows and quality that directly affect groundwater levels or quality
3.1.7, 3.2.7,
11.2 4. Plan to involve other agencies located in the groundwater basin 2
5. Adoption of monitoring protocols 11.2
6. Map of groundwater basin boundary, as delineated by DWR Bulletin 118, with agencies boundaries that are subject to GWMP
2.2, 4.1
7. For agencies not overlying groundwater basins, prepare the GWMP using appropriate geologic and hydrogeologic principles N/A
AB 3030 and SB 1938 Voluntary Components
1. Control of saline water intrusion 3.2.3
2. Identify and manage well protection and recharge areas 3.2, 11.2
3. Regulate the migration of contaminated groundwater 3.2
4. Administer well-abandonment and destruction program 11.2, 11.9
5. Control and mitigate groundwater overdraft 3.2, 5.3
6. Replenish groundwater 3.2, 5.3
7. Monitor groundwater levels 3.2, 11.2
8. Develop and operate conjunctive use projects 3.2, 5.3
9. Identify well-construction policies 11.9
10. Develop and operate groundwater contamination cleanup, recharge, storage, conservation, water-recycling, and extraction projects
3.2, 5.3
11. Develop relationships with state and federal regulatory agencies 1.1, 3.2, 4.10
12. Review land use plans and coordinate with land use planning agencies to assess activities that create reasonable risk of groundwater contamination
5.1 DWR Bulletin 118 Suggested Components
1. Manage with guidance of advisory committee 2.4, 9
2. Describe area to be managed under GWMP 2.1
3. Create links between BMOs and goals and actions of GWMP 3, 11.6
4. Describe GWMP monitoring programs 3.2, 11.2
5. Describe integrated water–management planning efforts 3.2, 4.8.3,
5.3.3.1, 5.3.3.6
Hemet/San Jacinto Groundwater Management Area
Water Management Plan
Description Section(s)
6. Report of implementation of GWMP 11.2, 11.5
7. Evaluate GWMP periodically 11.5, 9.6.2
Hemet/San Jacinto Groundwater Management Area
Water Management Plan
G
Appendix G: Stipulated
Judgment
H
Appendix H: Soboba
Settlement Agreement
I
Appendix I: Water
Shortage Contingency Plan
Water Shortage Contingency Plan
Eastern Municipal Water District
June 2021
i
Introduction.................................................................................................................................................... 1
1.0 Water Supply Reliability Analysis ...................................................................................................... 1
2.0 Annual Water Supply and Demand Assessment Procedures .......................................................... 2 Decision Making Process .............................................................................................................. 2 Data and Methodologies ............................................................................................................... 3
2.2.1 Evaluation Criteria ..................................................................................................................... 3
2.2.2 Water Supply ............................................................................................................................. 3
2.2.3 Unconstrained Customer Demand ............................................................................................ 3
2.2.4 Planned Water Use for Current Year Considering Dry Subsequent Year ................................ 3
2.2.5 Infrastructure Considerations .................................................................................................... 3
2.2.6 Other Factors ............................................................................................................................ 3
3.0 Six Standard Water Shortage Levels ................................................................................................ 3 Wholesale Shortage Levels .......................................................................................................... 3 Retail Shortage Levels .................................................................................................................. 7
4.0 Shortage Response Actions ............................................................................................................ 11 Supply Augmentation .................................................................................................................. 11 Demand Reduction Actions and Mandatory Use Restrictions .................................................... 11 Operational Changes .................................................................................................................. 14 Additional Mandatory Restrictions............................................................................................... 14 Emergency Response Plan ......................................................................................................... 15 Seismic Risk Assessment and Mitigation Plan ........................................................................... 16 Shortage Response Action Effectiveness ................................................................................... 16
5.0 Communication Protocols ............................................................................................................... 17
6.0 Compliance and Enforcement ......................................................................................................... 18 Wholesale .................................................................................................................................... 18 Retail ........................................................................................................................................... 18 Penalties ...................................................................................................................................... 18 Appeals and Exemption Process ................................................................................................ 19
7.0 Legal Authorities ............................................................................................................................. 19
8.0 Financial Consequences of WSCP ................................................................................................. 20
9.0 Monitoring and Reporting ................................................................................................................ 21
10.0 WSCP Refinement Procedures....................................................................................................... 22
11.0 Special Water Feature Distinction ................................................................................................... 22
12.0 Plan Adoption, Submittal, and Availability ....................................................................................... 22
13.0 Attachment: EMWD Code Title 5, Article 10 .................................................................................. 23
14.0 Attachment. Resolution of Adoption for WSCP.............................................................................. 32 ii
Water Shortage Contingency Plan Eastern Municipal Water District 1 This document represents the Water Shortage Contingency Plan (WSCP) adopted by Eastern Municipal Water District (EMWD). The document follows the structure recommended in guidance documents prepared by the California Department of Water Resources (DWR). The numbering of Sections 1 through 12 corresponds with the numbered sections in the UWMP Guidebook.
Recognizing the need to preserve and protect public health and safety, EMWD’s WSCP applies regulations and restrictions on the delivery and consumption of potable outdoor and indoor water use during water shortages. EMWD’s WSCP, originally adopted by ordinance, is now Article 10 to Title 5 of EMWD’s Administrative Code. A draft revision of Article 10 to reflect the changes incorporated in this document is attached to this WSCP.
The WSCP is based on the following priorities:
Public safety, health and welfare
Sustaining economic vitality
Quality of life
Restrictions are structured to protect the safety, health and welfare of the public and minimize the impact a water shortage may have on the local economy and quality of life. This is done mainly through the use of EMWD’s allocation-based tiered rate structure, focusing on those customers with wasteful behaviors first and then targeting other customers as a shortage becomes more severe.
This plan addresses actions that EMWD would take as a wholesale supplier and as a retail supplier.
EMWD is a member agency of the Metropolitan Water District of Southern California (Metropolitan) and receives imported water supplies from Metropolitan. Wholesale customers are allocated water using the formula and methodology in Metropolitan’s Water Supply Allocation Plan (WSAP).
For retail customers, over ninety percent of EMWD’s customers are either single-family residential, multifamily residential or landscape customers. These customers are subject to allocation-based tiered rates.
There are four tiers in EMWD’s rate structure; the first two tiers apply to indoor and outdoor use respectively, the third tier is applied to water use up to 50 percent above the Tier 1 and 2 budgets, and Tier 4 is applied to any water use in excess of Tier 3. In times of water shortage, the thresholds for Tiers 2 and 3 are reduced as shortage levels increase. Under the most extreme shortage conditions, no outdoor water use is allowed, and indoor water use may be restricted up to 50 percent.
Commercial, Industrial, and Institutional (CII) and agricultural customers must also reduce demand during periods of shortage. These customers face event-driven penalties and could face fines if found violating water use restrictions.
EMWD has prepared this plan and is adopting it alongside its 2020 Urban Water Management Plan (UWMP). The WSCP is a separate document from the UWMP. EMWD will continue to monitor the effectiveness of this WSCP, and if the need arises to modify this plan, EMWD will follow the update procedures described in Section 12.
This section provides a summary of the supply reliability analysis presented in the UWMP and highlights key issues that could create a shortage condition.
EMWD’s supplies are highly reliable and have proven to be resilient even under drought conditions.
Therefore, under a typical dry year scenario, EMWD would expect little to no impact to the availability of its local supplies. However, EMWD may increase delivers from Metropolitan to account for any increases in demand resulting from the hydrologic conditions. After several dry years, Metropolitan could face reduced supply capabilities during the next five years. If a shortage occurs, Metropolitan may implement its water supply allocation plan for member agencies in order to preserve storage reserves. The WSAP charges significantly higher rates for water deliveries over the allocated amount for each member agency but does not physically limit the volume of deliveries that a member agency may take.
Water Shortage Contingency Plan Eastern Municipal Water District 2 The full reliability analysis is presented in Chapter 7 of EMWD’s UWMP. Although that analysis demonstrates that the region’s urban water supply is reliable, there are potential issues that could create a shortage condition. These include:
An extended drought more severe than historic events, possibly impacted by climate change A natural disaster or a malevolent act that disrupts delivery of imported water from the Colorado River or the SWP
An extended and wide-spread power outage
Reductions in imported water supply due to environmental restrictions related to endangered species or habitat protection
Identification of a currently unregulated contaminant that affects the region’s groundwater supply Regulatory mandates to reduce water use
Water shortage contingency planning provides a way to plan for these risks and anticipate actions that should be implemented to manage the impacts. This plan describes how EMWD intends to respond to such shortage events.
EMWD will be required to prepare an Annual Water Supply and Demand Assessment, referred to by DWR as the Annual Assessment, and submit it to DWR each year, beginning July 1, 2022. The Annual Assessment is intended to meet requirements of Water Code Section 10632.1 and present an assessment of the likelihood of a water shortage occurring during the next 12 months. This section of the WSCP outlines the procedures that EMWD will use to prepare the Annual Assessment. The procedures defined in this section will allow EMWD to follow a consistent annual procedure for making the determination of whether to activate the WSCP.
The procedures for declaring a shortage are identified in Section 5.1004 of EMWD’s administrative code, which states that,
EMWD’s General Manager shall request the Board of Directors to authorize and implement the provisions of the Plan. The request shall be made at a regular or special meeting of the Board of Directors, to implement provisions of the Plan. The Board of Directors has the authority to initiate or terminate the water shortage contingency measures described in this Plan.
Decision Making Process
EMWD will use the following procedures in preparing the Annual Assessment.
1. In February and March of each year, EMWD staff will review available data related to anticipated supplies and demands. EMWD staff will coordinate with Metropolitan and with EMWD’s wholesale customers on the regional outlook for water supply reliability.
2. In May of each year, EMWD staff will present a recommendation to the EMWD Board of Directors for approval. The board will approve the determination of supply reliability and will take actions to implement shortage response actions, if needed. The assessment and recommendations for implementation of shortage response actions will be posted publicly in EMWD’s board agenda for the meeting.
3. In June of each year, EMWD will prepare the Annual Assessment with required information and submit it to DWR.
The timeline may be modified to reflect updated information available from Metropolitan. Metropolitan will be preparing its own Annual Assessment each year. The draft WSCP published by Metropolitan describes a process of preparing the Annual Assessment for approval by the Metropolitan Board of Directors in June of each year. EMWD staff would seek to make EMWD’s Annual Assessment reflective of the information provided by Metropolitan.
Water Shortage Contingency Plan Eastern Municipal Water District 3 Data and Methodologies
This section describes the data and methodologies that will be used by EMWD to evaluate water system reliability for the coming year, while considering that the year to follow could be dry.
2.2.1 Evaluation Criteria
EMWD will rely on locally applicable criteria for each Annual Assessment. These criteria will include the annual reports prepared to describe conditions in the groundwater basin and annual updates provided by Metropolitan on its supply reliability.
2.2.2 Water Supply
EMWD’s anticipated supplies will be quantified for the near-term future, and descriptive text will be used to note any anticipated reductions in supply.
2.2.3 Unconstrained Customer Demand
EMWD will prepare an estimate of unconstrained demand (as the term is used in Water Code Section 10632(a)(2)(B)(i)). The estimated demand will be calculated using the demand projection approach described in the UWMP, in combination with updated data for connections, climate, changes in land use, and recent water usage history.
2.2.4 Planned Water Use for Current Year Considering Dry Subsequent Year EMWD will describe the anticipated use of water supplies for the coming year, with the anticipation that the following year will be dry. The supplies will be characterized in a manner consistent with the UWMP, in combination with updated data for climate and recent observations.
2.2.5 Infrastructure Considerations
EMWD will describe any potential infrastructure constraints on the ability to deliver adequate supplies to meet expected customer demands in the coming year. EMWD will show that its system of wells, desalters, filtration plants, pipelines, pump stations, and storage tanks have adequate capacity to deliver the anticipated demands. EMWD will describe any anticipated capital projects that are intended to address constraints in production, treatment, or distribution.
2.2.6 Other Factors
EMWD will describe any specific locally applicable factors that could influence or disrupt supplies. EMWD will also describe unique local considerations that are considered as part of the annual assessment.
Since the preparation of the 2015 UWMP, the California Water Code (CWC) has been amended to define six standard shortage levels. The six standard water shortage levels correspond to progressively increasing estimated shortage conditions (up to 10-, 20-, 30-, 40-, 50- percent, and greater than 50- percent shortage compared to the normal reliability condition). If an agency elects to retain an existing set of shortage levels from its previous WSCP, then the document must provide a crosswalk to relate the existing stages to the six standard stages. This crosswalk is shown in Table 3.
EMWD’s plan addresses these stages in actions it will take as a wholesale supplier and as a retail supplier.
Wholesale Shortage Levels
During mandatory water shortage stages, wholesale customers will be required to reduce their retail water demands such that they are equivalent to EMWD’s retail water demand reductions. If Metropolitan Water Shortage Contingency Plan Eastern Municipal Water District 4 imposes limited supply allocations on EMWD and other member agencies, supply to EMWD’s wholesale customers will be allocated using the formula and methodology based on Metropolitan’s WSAP. EMWD will establish base period demands and then adjust them for growth and changes in local supply.
At each stage, wholesale customers will not experience shortages on the wholesale level that are greater than one-and-a-half times the percentage shortage of regional water supplies. The wholesale customers will also not face a retail shortage less than the regional shortage. Credits will be given for conservation and investment in local supplies. Penalty rates apply for use over allocations.
As a wholesale supplier, EMWD will maintain consistency with Metropolitan’s plan where possible. The stages in Metropolitan’s 2020 WSCP are shown in Table 1.
The stages for EMWD’s wholesale plan are shown in Table 2.
Water Shortage Contingency Plan Eastern Municipal Water District 5 Table 1. Metropolitan Shortage Stages and Response Actions Shortage
Stage
Shortage
Percentage Shortage Response Effectiveness
1 Up to 10% Take from Storage
Execute Flexible Supplies
Implement Demand Reduction
Implement Water Supply Allocation
Plan
• 0 to 100% met by Storage
• 0 to 100% met by Flexible Supplies
• 0 to 20% of total retail water use met by voluntary Demand Reduction • 0 to 50% of total base demand met by WSAP supply allocation 2 10% to 20% Take from Storage
Execute Flexible Supplies
Implement Demand Reduction
Implement Water Supply Allocation
Plan
• 0 to 100% met by Storage
• 0 to 100% met by Flexible Supplies
• 0 to 20% of total retail water use met by voluntary Demand Reduction • 0 to 50% of total base demand met by WSAP supply allocation 3 20% to 30% Take from Storage
Execute Flexible Supplies
Implement Demand Reduction
Implement Water Supply Allocation
Plan
• 0 to 100% met by Storage
• 0 to 100% met by Flexible Supplies
• 0 to 20% of total retail water use met by voluntary Demand Reduction • 0 to 50% of total base demand met by WSAP supply allocation 4 30% to 40% Take from Storage
Execute Flexible Supplies
Implement Demand Reduction
Implement Water Supply Allocation
Plan
• 0 to 100% met by Storage
• 0 to 100% met by Flexible Supplies
• 0 to 20% of total retail water use met by voluntary Demand Reduction • 0 to 50% of total base demand met by WSAP supply allocation 5 40% to 50% Take from Storage
Execute Flexible Supplies
Implement Demand Reduction
Implement Water Supply Allocation
Plan
• 0 to 100% met by Storage
• 0 to 100% met by Flexible Supplies
• 0 to 20% of total retail water use met by voluntary Demand Reduction • 0 to 50% of total base demand met by WSAP supply allocation 6 More than
50%
Take from Storage
Execute Flexible Supplies
Implement Demand Reduction
Implement Water Supply Allocation
Plan
• 0 to 100% met by Storage
• 0 to 100% met by Flexible Supplies
• 0 to 20% of total retail water use met by voluntary Demand Reduction • 0 to 50% of total base demand met by WSAP supply allocation Water Shortage Contingency Plan Eastern Municipal Water District 6 Table 2. Wholesale Water Shortage Contingency Plan Levels (DWR Table 8-1) Shortage
Level
Percent Shortage
Range Water Shortage Condition
1 Up to 10% Supply watch. Customers will be asked to reduce up to 10% of demand voluntarily. 2 Up to 25% Supply alert. Customers will be asked to reduce 25% of demand voluntarily.
3 Up to 25%
Mandatory Waste Reduction. At this stage efforts will be focused on a mandatory reduction of excessive water
use.
4 Up to 50% Mandatory Outdoor Reduction. At this stage efforts will be focused on mandatory reduction of outdoor water use. 5 >50%
Severe shortage or catastrophic incident
Mandatory Indoor Reduction. At this stage efforts will be focused on mandatory reduction of indoor water use.
This stage would only be implemented in response to a
catastrophic loss of supplies requiring a 50 percent or more reduction in demand.
NOTES: EMWD has built flexibility into its WSCP. Stages are not directly tied to water supply conditions. The WSCP can be implemented as needed to meet a reduction in demand or to respond to other conditions.
EMWD’s previous WSCP was updated in 2019 and included five stages. EMWD has elected to retain its five shortage stages and provide a crosswalk to relate the existing stages to the six standard shortage levels. Because the existing Levels 3, 4, and 5 include sub-stages, EMWD will be able to better align its shortage levels and response actions with the six standard levels. This crosswalk is shown in Table 3.
Water Shortage Contingency Plan Eastern Municipal Water District 7 Table 3. Crosswalk from EMWD Stages to Six Standard Levels EMWD
Shortage
Stage
Supply
Condition/Shortage
Percent
Shortage
Range DWR Standard Level
Shortage
Level
1 Supply Watch Up to 10% 1 <= 10%
2 Supply Alert Up to 25% 2 10 – 20%
3 Mandatory Waste
Reduction
Up to 25% 3 20 – 30%
4 Mandatory Outdoor
Reduction Up to 50%
4 30 – 40%
5 40 – 50%
5 Severe Shortage or
Catastrophic
Incident
> 50% 6 > 50%
Retail Shortage Levels
The WSCP limits water demand during times of shortage in five stages. These stages can be triggered when there is water deficiency caused by limitations on supply or by limitations on EMWD’s delivery system. The plan shall be implemented in case of a long or short-term water deficiency, or in case of an emergency water shortage.
EMWD will implement an appropriate stage based on current water conditions such as:
EMWD water supply conditions and storage levels
Statewide water supply conditions
Local water supply and demand conditions
Metropolitan WSAP implementation or other actions requiring a reduction in water demand Actions of surrounding agencies
Higher stages will be implemented as shortages continue and/or if customer response does not bring about desired water savings.
When implementation of the WSCP is triggered by anticipated limitations in supply or delivery, EMWD’s General Manager shall request the Board of Directors to authorize and implement the provisions of the WSCP. The request shall be made at a regular or special meeting of the Board of Directors, to implement provisions of the WSCP.
The Board of Directors has the authority to initiate or terminate the water shortage contingency measures described in the WSCP. When a water shortage emergency occurs, the WSCP authorizes the General Manager to declare the extent of a potable water shortage emergency and to implement the appropriate water shortage contingency measures.
EMWD’s retail shortage levels are identified in Table 4. The first two stages of the WSCP are voluntary, while the successive stages are mandatory and include sub-stages to reflect changes to the tiered rate structure.
Water Shortage Contingency Plan Eastern Municipal Water District 8 Table 4. Retail Water Shortage Contingency Plan Levels (DWR Table 8-1) Shortage
Level
Percent Shortage
Range Water Shortage Condition
1 Up to 10% Supply watch. Customers will be asked to reduce up to 10% of demand voluntarily. 2 Up to 25% Supply alert. Customers will be asked to reduce 25% of demand voluntarily.
3 Up to 25%
Mandatory Waste Reduction. At this stage efforts will be focused on a mandatory reduction of excessive water
use.
4 Up to 50% Mandatory Outdoor Reduction. At this stage efforts will be focused on mandatory reduction of outdoor water use. 5 >50%
Severe shortage or catastrophic incident
Mandatory Indoor Reduction. At this stage efforts will be focused on mandatory reduction of indoor water use.
This stage would only be implemented in response to a
catastrophic loss of supplies requiring a 50 percent or more reduction in demand.
NOTES: EMWD has built flexibility into its WSCP. Stages are not directly tied to water supply conditions. The WSCP can be implemented as needed to meet a reduction in demand or to respond to other conditions. Levels 3 through 5 include three sub-stages each.
Each level in Table 4 represents an anticipated reduction in the supplies that would normally be available to the agency. These supply reductions could be the result of a variety of potential causes including natural forces, system component failure or interruption, regulatory actions, contamination, or any combination thereof.
The stages involve voluntary and mandatory conservation measures and restrictions, depending on the causes, severity, and anticipated duration of the water supply shortage. The locally appropriate shortage response actions that would be taken at each level to address the resulting gap between supplies and demands are described in the following section.
EMWD’s process for initiating or terminating stages is outlined in Section 5.1007 of EMWD’s Administrative Code, which notes that,
The General Manager will recommend the appropriate stage of response to a water shortage based on the best information available at the time. Conditions that will be considered include:
EMWD water supply conditions and storage levels
Statewide water supply conditions
Local water supply and demand conditions
Metropolitan Water Supply Allocation Plan implementation or other actions requiring a reduction in water demand
Actions by surrounding agencies
As water supply conditions either deteriorate or improve, the General Manager will return to the Board to revise the appropriate stage of response. It shall not be necessary to implement any stage prior to another; the stages may be implemented in any reasonable order.
In the event the State or local agencies, through executive action, emergency legislation or other actions, impose conditions, requirements, or procedures that are not included in the EMWD water shortage Contingency Plan, the General Manager is authorized to implement such measures as are reasonably required to bring EMWD’s actions in each stage into functional conformity with such conditions, requirements, or procedures.
Water Shortage Contingency Plan Eastern Municipal Water District 9 The actions in each stage are identified in Section 5.1009 of EMWD’s administrative code and are summarized in Table 5. Table 5 is not a required element of the WSCP but is presented as a consolidated summary of the actions identified in the EMWD administrative code.
Water Shortage Contingency Plan Eastern Municipal Water District 10 Table 5. Summary of Stages and Actions
Stage 1. Supply Watch 2. Supply Alert 3. Mandatory Waste Reduction 4. Mandatory Outdoor Reduction
5. Mandatory Indoor
Reduction
Description At this stage, efforts will be
focused on encouraging
voluntary reduction of up to
10 percent. Customers can
reduce demand by following
the water use efficiency
requirements of Section 5,
Article 6 - Water
Conservation of the
Administrative Code. Other
actions may be encouraged
as appropriate.
At this stage efforts will be
focused on a voluntary
reduction of up to 25
percent. Customers can
reduce demand by
following the water use
efficiency requirements of
Section 5, Article 6 - Water
Conservation of the
Administrative Code.
At this stage, efforts will be focused on a mandatory reduction of excessive water use. Customers can reduce demand by following the conserving actions detailed in Stages 1 and 2.
At this stage efforts will be focused on a mandatory reduction of outdoor water use.
Customers can reduce demand by following the conserving actions required in Stages 1 through 3 and limiting watering or irrigating of lawn, landscape or other vegetated areas with sprinklers to the following schedule:
a) June through August – A maximum of two days a week; and b) September through May – A maximum of one day a week.
At this stage efforts will be
focused on a mandatory
reduction of indoor water use.
This stage would only be
implemented in response to a
catastrophic loss of supplies
requiring a 50 percent or more
reduction in demand.
Actions Voluntary customer actions
could include the following:
a) Reduce watering or
irrigating of lawn,
landscape or other
vegetated areas with
sprinklers by one day
a week;
b) All leaks, breaks, or
other malfunctions in
the water user’s
plumbing or
distribution system
repaired within 48
hours;
c) Refrain from filling or
re-filling of ornamental
lakes or ponds; and
d) Refrain from using
potable water to wash
or clean a vehicle,
including but not
limited to, any
automobile, truck, van,
bus, motorcycle, boat
or trailer, whether
motorized or not.
For tiered customers:
a) Stage 3a: No variances or adjustments will be allowed for filling swimming pools, establishing landscape or leaks that are not repaired within 48 hours;
b) Stage 3b: Excessive tier budgets (Tier 3 Budgets for residential customers, Tier 2 Budgets for non-residential) will be decreased by up to 50 percent; and
c) Stage 3c: Excessive tier budgets (Tier 3 Budgets for residential customers, Tier 2 Budgets for non-residential) will be decreased by up to 100 percent.
Observation of any water waste in opposition to restrictions listed in Section 5, Article 6 - Water Conservation of the Administrative Code or under this or any previous stage of the Plan are subject to the following penalties:
a) For multi-family, commercial, institutional, industrial, agricultural, and landscape accounts:
(1) For the first violation, the District shall issue a written notice of fact of such violation to the Customer;
(2) For a second violation a surcharge in the amount of $100.00 shall be added to the Customer’s water bill;
(3) For a third violation a surcharge in the amount of $200.00 shall be added to the Customer’s water bill; and
(4) For a fourth and any subsequent violation a surcharge of $300.00 shall be added to the Customer’s water bill.
b) For single-family residential accounts:
(1) For the first violation, the District shall issue a written notice of fact of such violation to the Customer;
(2) For a second violation a surcharge in the amount of $25.00 shall be added to the Customer’s water bill;
(3) For a third violation a surcharge in the amount of $50.00 shall be added to the Customer’s water bill; and
(4) For a fourth and any subsequent violation a surcharge of $100.00 shall be added to the Customer’s water bill.
For tiered customers:
a) Stage 4a: Outdoor water budgets will be decreased by 10 percent; b) Stage 4b: Outdoor water budgets will be decreased by up to 50 percent; and
c) Stage 4c: Outdoor water budgets will be decreased by up to 100 percent and the irrigation of non-functional turf by multi-family residential, commercial, industrial, and institutional customers is prohibited.
Observation of any water waste in opposition to restrictions listed in Section 5, Article 6 - Water Conservation of the Administrative Code or under this or any previous stage of the Plan, or the irrigation of non-functional turf by multifamily residential, commercial, industrial, and institutional customers when the District is in Stage 4c or higher are subject to the following penalties:
a) For multi-family, commercial, institutional, industrial, agricultural, and landscape accounts:
(1) For the first violation, the District shall issue a written notice of fact of such violation to the Customer;
(2) For a second violation a surcharge in the amount of $200.00 shall be added to the Customer’s water bill;
(3) For a third violation a surcharge in the amount of $400.00 shall be added to the Customer’s water bill; and
(4) For a fourth and any subsequent violation a surcharge of $600.00 shall be added to the Customer’s water bill.
b) For single-family residential accounts:
(1) For the first violation, the District shall issue a written notice of fact of such violation to the Customer;
(2) For a second violation a surcharge in the amount of $50.00 shall be added to the Customer’s water bill;
(3) For a third violation a surcharge in the amount of $100.00 shall be added to the Customer’s water bill; and
(4) For a fourth and any subsequent violation a surcharge of $200.00 shall be added to the Customer’s water bill.
For tiered customers:
a) Stage 5a: Indoor water
budgets will be decreased
by 10 percent;
b) Stage 5b: Indoor water
budgets will be decreased
by up to 30 percent; and
c) Stage 5c: Indoor water
budgets will be decreased
by up to 50 percent.
Commercial, Industrial,
Institutional, Agricultural
customers and any other
customer without a water
budget will be given a water
budget based on historical
water use. Allocations will be
decreased in stages and the
current Tier 4 rate will be
applied to any use above the
decreased allocation.
a) Stage 5a: Budgets will be
decreased by 10 percent;
b) Stage 5b: Budgets will be
decreased by up to 30
percent; and
c) Stage 5c: Budgets will be
decreased by up to 50
percent.
Restrictions and penalties
implemented in earlier stages
shall also remain in effect.
Enforcement Demand reduction will be
encouraged through the ongoing enforcement listed in
Section 5, Article 6 - Water
Conservation of the
Administrative Code including
EMWD’s water budget based
tiered rate and penalties for
run off.
Demand reduction will be
encouraged through the
ongoing enforcement listed
in Section 5, Article 6 -
Water Conservation of the
Administrative Code
including EMWD’s water
budget based tiered rate
and penalties for run off.
Demand reduction will be enforced through changes to EMWD’s water budget-based tiered rate structure and observation-based penalties:
Demand reduction will be enforced through changes to EMWD’s water budget based tiered rate structure and observation-based penalties:
Demand reduction will be
enforced through changes to
EMWD’s water budget based
tiered rate structure and
penalties for run off as detailed
in Section 5, Article 6 - Water
Conservation of the
Administrative Code.
Water Shortage Contingency Plan Eastern Municipal Water District 11 This section describes the shortage response actions that would be taken by EMWD at each shortage level. These actions have been grouped into categories including:
Supply Augmentation Actions
Demand Reduction Actions and Mandatory Use Restrictions Operational Changes
Supply Augmentation
For long-range planning, EMWD continues to evaluate opportunities for transfers, exchanges, and other purchases of imported water to increase supply reliability. These programs are described in the supply sections of the UWMP.
Metropolitan’s WSCP identifies actions it has taken to be in a position to augment supplies during dry periods. These actions are summarized in Metropolitan’s WSCP.
EMWD has not identified specific supply augmentation actions that would be taken to address a shortterm water shortage. The standard categories of supply augmentation actions are shown in Table 6.
Table 6. Supply Augmentation Actions (DWR Table 8-3)
Shortage
Level
Supply Augmentation Methods and
Other Actions by Water Supplier
How much is this
going to reduce the
shortage gap?
Additional
Explanation or
Reference
Transfers
Exchanges
Other purchases
New recycled water
Rain seeding
Stored emergency supply
Other actions (describe)
NOTES:
Demand Reduction Actions and Mandatory Use Restrictions The demand reduction actions that will be implemented at each shortage level are shown in Table 7. The format of Table 7 is based on the standard submittal table defined by DWR. The column titled, “Penalty, Charge, or Enforcement” is a Yes/No field to characterize whether there is a penalty, charge, or enforcement action associated with implementing the demand reduction action. This field is a required field in the standard submittal table defined by DWR.
EMWD utilizes consumption reduction methods to reduce demands for potable water within its service area. EMWD’s methods include supplementing its water conservation program during WSCP implementation and implementing its allocation-based tiered rate billing structure by progressively reducing allocations for tiers as higher stages of the WSCP are implemented. Consumption reduction methods that can be used in EMWD’s service area are summarized in Table 7.
Water Shortage Contingency Plan Eastern Municipal Water District 12 Table 7. Demand Reduction Actions (DWR Table 8-2)
Shortage
Level
Demand Reduction
Actions
How much
is this going
to reduce
the shortage
gap? Additional Explanation or Reference
Penalty,
Charge, or
Other
Enforcement?
1-5 Expand Public
Information Campaign
N/A EMWD will continue to implement its
conservation program and may supplement
programs during WSCP implementation.
No
1 Other - Prohibit use of
potable water for
washing hard
surfaces
N/A Except for health or sanitary reasons Yes
1 Other - Customers
must repair leaks,
breaks, and
malfunctions in a
timely manner
N/A Repair leaks within 48 hours of occurrence Yes
1 Landscape - Limit
landscape irrigation to
specific times
N/A
Only between 9:00 p.m. and 6:00 a.m. except
when:
-manually watering
-establishing new landscape
-temperatures are predicted to fall below freezing
-it's for very short periods of time to adjust or
repair an irrigation system
Yes
1 Landscape - Prohibit
certain types of
landscape irrigation
N/A
Unattended irrigation systems using potable
water are prohibited unless they are limited to no
more than fifteen (15) minutes watering per day,
per station. This limitation can be extended for:
-Very low flow drip irrigation systems when no
emitter produces more than two (2) gallons of
water per hour
-Weather based controllers or stream rotor
sprinklers that meet a 70% efficiency
Yes
1 Landscape - Restrict
or prohibit runoff from
landscape irrigation
N/A Avoid over watering or watering of hardscape
and the resulting runoff Yes
1 Other water feature or
swimming pool
restriction
N/A Decorative fountains must be equipped with a
recycling system Yes
1 Other N/A Allowing water to run while washing vehicles is prohibited Yes
1 Other N/A
Install new landscaping with low-water demand
trees and plants. New turf shall only be installed
for functional purposes
Yes
1 Landscape - Other
landscape restriction
or prohibition
N/A Watering during rain, or within 48 hours after
measurable rain, is prohibited Yes
2 Landscape - Other
landscape restriction
or prohibition
Medium
Reduce watering or irrigating of lawn, landscape
or other vegetated areas with sprinklers by one
day a week
Yes
2 Other - Customers
must repair leaks,
breaks, and
malfunctions in a
timely manner
Medium
All leaks, breaks, or other malfunctions in the
water user’s plumbing or distribution system
repaired within 72 hours
Yes
2 Other water feature or
swimming pool
restriction
Low Refrain from filling or re-filling of ornamental
lakes or ponds Yes
Water Shortage Contingency Plan Eastern Municipal Water District 13 Shortage
Level
Demand Reduction
Actions
How much
is this going
to reduce
the shortage
gap? Additional Explanation or Reference
Penalty,
Charge, or
Other
Enforcement?
2 Other Medium
Refrain from using potable water to wash or
clean a vehicle, including but not limited to, any
automobile, truck, van, bus, motorcycle, boat or
trailer, whether motorized or not
Yes
3 Implement or Modify
Drought Rate
Structure or
Surcharge
High Stage 3 progressively reduces the tier 3
allocation. Any water used over the allocations
for tiers 1-3 is charged at the tier 4 rate2. Yes
3a Other Medium
No variances or adjustments will be allowed for
filling swimming pools, establishing new
landscapes or leaks that are not repaired within
48 hours
Yes
3b
Implement or Modify
Drought Rate
Structure or
Surcharge
High Tier 3 (Excessive Use) water budget decreased
by 50% Yes
3c
Implement or Modify
Drought Rate
Structure or
Surcharge
High Tier 3 (Excessive Use) water budget decreased
by 100% Yes
4 Implement or Modify
Drought Rate
Structure or
Surcharge
High Stage four eliminates the tier 3 allocation and
progressively reduces the tier 2 allocation. Any
water used over the allocations for tiers 1-2 is
charged at the tier 4 rate2.
Yes
4 Landscape - Other
landscape restriction
or prohibition
Medium
Watering or irrigating of lawn, landscape, or
other vegetated areas with sprinklers should be
limited to the following schedule:
-June – August: A maximum of two days a week
-September – May: A maximum of one day a
week
Yes
4a
Implement or Modify
Drought Rate
Structure or
Surcharge
High Tier 2 (Outdoor Use) water budget decreased by
10% Yes
4b
Implement or Modify
Drought Rate
Structure or
Surcharge
High Tier 2 (Outdoor Use) water budget decreased by
up to 50% Yes
4c
Implement or Modify
Drought Rate
Structure or
Surcharge
High Tier 2 (Outdoor Use) water budget decreased by
up to 100% Yes
5 Implement or Modify
Drought Rate
Structure or
Surcharge r
High Stage 5 eliminates the tier 3 and 4 allocations
and progressively reduces the tier 1 allocation.
Any water used over the allocations for tiers 1 is
charged at the tier 4 rate2.
Yes
5a
Implement or Modify
Drought Rate
Structure or
Surcharge
High Tier 1 (Indoor Use) water budget decreased by
10% Yes
5b
Implement or Modify
Drought Rate
Structure or
Surcharge
High Tier 1 (Indoor Use) water budget decreased by
30% Yes
Water Shortage Contingency Plan Eastern Municipal Water District 14 Shortage
Level
Demand Reduction
Actions
How much
is this going
to reduce
the shortage
gap? Additional Explanation or Reference
Penalty,
Charge, or
Other
Enforcement?
5c
Implement or Modify
Drought Rate
Structure or
Surcharge
High Tier 1 (Indoor Use) water budget decreased by
50% Yes
5 Implement or Modify
Drought Rate
Structure or
Surcharge
High
CII, Agricultural, and any other customer without
a water budget will be given a water budget
based on historical water use, and allocations
will be reduced according to the percentages
listed for stages 5a-5c (up to 50 percent)
Yes
Notes: EMWD has four tiers in its allocation-based tiered rate structure for residential customers. Some non-residential customers are also on an allocation-based rate structure, but these customers have only three tiers. Tier 4 usage for residential customers and Tier 3 usage for non-residential customers are classified as wasteful usage, which is defined as water use exceeding 150% of a customer’s water budget. The current wasteful rate varies across the service area but ranges from $11.62 to $12.75 per hundred cubic feet as of 1/1/2021
Operational Changes
EMWD has identified operational changes that could be made to help address a short-term gap between demands and available supplies. These include:
Improved monitoring and analysis of customer water usage Reductions in flushing of hydrants and dead-end lines Expediting planned system improvement projects that include reduction in water loss (e.g., replacement of water mains that are experiencing higher rates of leaks and breaks) Additional Mandatory Restrictions
EMWD has identified a series of restrictions that will be implemented at different shortage levels. These prohibitions are included in the demand reduction actions in Table 7.
The WSCP prohibitions and reduction methods are organized by customer groups with different limitations on each group. Stages 1 and 2 start with voluntary measures. As the water deficiency increases, measures become mandatory and are intended to lead to the needed reduction in water demand.
The WSCP targets a reduction in demand in specific tiers for single-family residential, multi-family residential and landscape customers. Table 8 summarizes the required reduction in each tier by stage.
Water Shortage Contingency Plan Eastern Municipal Water District 15 Table 8. Tiered-Rate Water Reduction Requirements
Stage
Tier 1
Indoor Use
Tier 2
Outdoor Use
Tier 3
Excessive Use
Tier 4
Wasteful Use
1 Voluntary Reduction up to 10%
2 Voluntary Reduction up to 25%
3a No variances or adjustments will be allowed for filling swimming pools, establishing new landscapes or leaks that are not repaired within 48 hours. 3b 50% reduction
3c 100% reduction
4a 10% reduction 100% reduction
4b up to 50% reduction 100% reduction
4c up to 100% reduction 100% reduction
5a 10% reduction 100% reduction 100% reduction
5b 30% reduction 100% reduction 100% reduction
5c 50% reduction 100% reduction 100% reduction
In Stage 5, CII customers, agricultural customers and any other customer without a water budget will be assigned a water budget based on historical water use. Allocations will be decreased according to the percentages listed for Stages 5a-5c, and the current Tier 4 rate will be applied to any use above the decreased allocation value.
In order to reduce EMWD’s retail demand in the case of deficiency in water supply, EMWD developed water use efficiency requirements that are to be followed at all times. Additional prohibitions on end uses are implemented at higher stages of water shortage in addition to the on-going water use efficiency requirements. As part of EMWD’s WSCP, voluntary and mandatory water use reductions are expected through the on-going enforcement of the water use efficiency requirements, EMWD’s water allocationbased tiered rates, and penalties for run off. The previous sections summarize the water use efficiency requirements and additional prohibitions for each stage of EMWD’s WSCP. Under the most extreme deficiencies, these prohibitions would reduce demand by more than 50 percent.
Emergency Response Plan
The Water Code requires that an agency’s WSCP address catastrophic water shortages and plans to address them. This information can be addressed in the agency’s Emergency Response Plan (ERP).
Each agency’s ERP can contain sensitive information related to potential vulnerabilities or impacts of natural disasters or malevolent acts. Therefore, these documents are not typically made publicly available.
EMWD is a member of the California Water/Wastewater Agency Response Network (CalWARN), which supports and promotes emergency preparedness. More information about CalWARN is available at their web site at www.calwarn.org.
EMWD’s process for declaring an emergency water shortage is outlined in Section 5.1004(b) of the EMWD Administrative Code, which notes that
By adopting this Plan, the Board of Directors authorizes the General Manager to declare the extent of a potable water shortage emergency and to implement the appropriate water shortage contingency measures. The General Manager shall report such water shortage conditions and the level of response to the Board of Directors in a timely manner.
Water Shortage Contingency Plan Eastern Municipal Water District 16 The declaration of the Board of Directors shall be made by public announcement and shall be published in a newspaper of general circulation. The declaration shall become effective immediately upon such publication.
To protect EMWD customers in the case of an emergency, EMWD has developed the Water Shortage Emergency Operations Plan (WSEOP). This plan determines the operation response to many types of emergencies. It specifies chain of command and provides the authority to respond. Elements of that response can include interdepartmental staff notification and mobilization; activation of alternative water supply sources (i.e., interagency connections), use of temporary pumping facilities; use of power generators; public notification; and activation of conservation measures. An emergency is defined as any time period when Metropolitan or EMWD facilities are incapable of supplying potable water. An emergency could be caused by a natural disaster such as an earthquake or through facility failures. The WSEOP describes the coordination required between operational staff, management, community involvement staff and other EMWD employees. In addition, communication and cooperation will be required with the community and other agencies such as the Division of Drinking Water and Metropolitan.
In the event that one or more water supply sources are unavailable, remaining sources of supply will be maximized to meet demand. If needed, the WSCP could be implemented to conserve water and reduce demand. If an electrical or gas power outages occur, some of EMWD’s booster facilities have backup generators. Facilities without redundant power sources may be served on a priority basis by portable generators.
EMWD’s service area (retail and wholesale) is dependent on Metropolitan for approximately half of its supply. Metropolitan has prepared for emergencies using a combination of storage, facility design and redundant power sources. Emergency storage requirements are based on the potential for a major earthquake that renders major water transportation facilities out of service for six months. Assuming 100 percent of its supplies are unavailable for six months, Metropolitan has enough water storage to sustain 75 percent of normal year firm deliveries. In the event of a major power outage, water supply can be delivered by gravitational feed from recreational reservoirs, including Diamond Valley Lake Reservoir.
For treatment plants, Metropolitan has backup power generators in place in case of electrical outages.
Additional information about addressing catastrophic supply interruption can be found in Metropolitan’s 2020 UWMP.
Seismic Risk Assessment and Mitigation Plan
Water Code Section 10632.5 requires agencies to assess seismic risk to water supplies as part of their WSCP. The code also requires a mitigation plan for managing seismic risks.
In lieu of conducting their own seismic risk assessment, which can be a lengthy process, suppliers can comply with the Water Code requirement by submitting the relevant local hazard mitigation plan or multihazard mitigation plan.
EMWD participated in the development of the Riverside County Local Hazard Mitigation Plan, which was updated in 2018. The Riverside County LHMP is available on the Riverside County web site at https://rivcoemd.org/LHMP.
The Riverside County LHMP includes an assessment of the region’s vulnerability to a broad range of hazards, including earthquakes. It also describes mitigation strategies and actions to reduce the impacts of a seismic event. The other participating agencies continue to include seismic risk assessment in their planning process for system improvements.
EMWD has also prepared a 2017 Hazard Mitigation Plan to describe a risk assessment and mitigation plan for seismic events in its service area.
Shortage Response Action Effectiveness
EMWD has estimated the effectiveness of shortage response actions in terms of relative impact on reducing the gap between expected supplies and demands. These estimates were developed using industry resources and observations from recent operating history at the agency. These estimates have been included in Table 7.
Water Shortage Contingency Plan Eastern Municipal Water District 17 Timely and effective communication is a key element of WSCP implementation. EMWD will need to inform customers, the general public, and other government entities of WSCP actions taken during a water shortage (either one derived from the Annual Assessment, an emergency, or catastrophic event).
EMWD works closely with Metropolitan and neighboring water agencies in implementing communication strategies during water shortages.
The communication protocols to be used by EMWD at each shortage level are summarized in Table 9.
Table 9. Communication Protocols
Water Shortage
Level Typical Response Actions Communications Protocols and Processes 1 Limit landscape irrigation to specific times Postings on web site 2 Reduce watering or irrigating of lawn,
landscape, or other vegetated areas with
sprinklers by one day a week
Outreach through social media
3 Implement or Modify Drought Rate
Structure or Surcharge
Bill inserts, bill messages, letters to
customers, cable TV slides, emails
to customers.
4 Watering or irrigating of lawn, landscape,
or other vegetated areas with sprinklers
should be limited to the following schedule:
-June – August: A maximum of two days a
week
-September – May: A maximum of one day
a week
Door hangers, regional campaign
utilizing billboard advertisements,
ad placements
5 Implement or Modify Drought Rate
Structure or Surcharge
Direct contacts with customers
Notes: Communications protocols and processes are cumulative in nature.
Section 5.1002 of the EMWD Administrative Code notes that, EMWD will periodically provide the public with information about the Plan, including conditions under which each stage of the Plan is to be initiated or terminated and the conservation response measures to be implemented in each stage. This information will be provided by means of public events, website, press releases, bill inserts, etc.
Section 5.1008 of the EMWD Administrative Code notes that, When EMWD determines that a potable water shortage condition exists, any or all of the following notification procedures may be implemented:
(a) Notify the general public stakeholders, elected officials and other key decision-makers regarding the situation, actions to be taken, goals customers are intended to achieve, and how these actions will be implemented.
(b) The public at large will be informed of the situation and actions EMWD will be taking.
Communications will occur through any of the following: billing inserts, special mailings, telephone contact, e-mail, social media, roadway signage, water conservation booths, and other booths in the community, speaker’s bureau, community association meetings, newsletters, and education programs, etc. Literature appropriate to the drought circumstance will be provided Water Shortage Contingency Plan Eastern Municipal Water District 18 regarding the potable water shortage condition, conservation methods, and water-savings devices.
(c) Use of all forms of media will be employed. This would include public service announcements on radio and cable television, social media as well as earned media and advertisements in local newspapers.
(d) EMWD’s web site, www.emwd.org, will be the central location for messaging and customer communications.
This section describes how EMWD will ensure compliance with and enforce provisions of the WSCP.
Wholesale
Section 5.1011 of the EMWD Administrative Code notes that, During mandatory water shortage stages, wholesale customers will be required to reduce their retail water demand equivalent to EMWD’s retail water demand reduction. If Metropolitan has limited supply allocations to EMWD and other member agencies; supply to wholesale customers may be allocated using a formula and methodology based on the Metropolitan Water Supply Allocation Plan.
Potential penalties for not reducing demand could be up to 4 times the Metropolitan Tier 2 rate.
Retail
For Stages 1 and 2 of the WSCP, demand reduction is voluntary; but it will be encouraged through the on-going enforcement of EMWD’s water budget based tiered rates and penalties for runoff. Stage 3 of the WSCP is focused on a mandatory reduction of excessive water use through following the conserving actions detailed in Stages 1 and 2. Beginning with Stage 3, event-driven penalties can be imposed for violating any of the restrictions in the WSCP.
Demand reductions will be enforced through changes to EMWD’s water budget based tiered rate structure and observation-based penalties. Violations of the water runoff requirement are cumulative over a 12-month period. Table 10 lists penalties for event driven restrictions.
Penalties
The penalties for non-compliance imposed by EMWD are summarized in Table 10.
Table 10. Event-Driven Penalties and Charges
Stage Customer Category First
Violation
Second
Violation
Third
Violation
Fourth and
Subsequent
Violations
3 Single-Family Written Notice $25 Fine $50 Fine $100 Fine Multi-Family, CII, Agricultural,
and Landscape Written Notice $100 Fine $200 Fine $300 Fine 4-5
Single-Family Written Notice $50 Fine $100 Fine $200 Fine Multi-Family, CII, Agricultural,
and Landscape Written Notice $200 Fine $400 Fine $600 Fine Any funds collected from penalties will be dedicated to funding EMWD’s conservation programs.
Water Shortage Contingency Plan Eastern Municipal Water District 19 Appeals and Exemption Process
This section describes the appeals and exemption processes. Where feasible, specific exemptions can be identified and defined. Where not feasible, the process to appeal or obtain an exemption should be detailed.
Section 5.1010 of the EMWD Administrative Code notes that, All variance requests and appeals will be processed according to Section 5, Article 6 – Water Conservation of the Administrative Code.
This section describes the legal authorities that the agency relies upon to implement the shortage response actions and the associated enforcement actions.
EMWD’s Administrative Code provides it with the legal authority to implement the WSCP. The Water Shortage Contingency Plan is portrayed in Chapter 5, Article 10 of the Administrative Code. A draft of Article 10 is attached to this document.
In accordance with Water Code Chapter 3 (commencing with Section 350) of Division 1 general provisions regarding water shortage emergencies, EMWD shall declare a water shortage emergency in the event of a catastrophic interruption in supply.
EMWD shall coordinate with any city or county within which it provides water supply services for the possible proclamation of a local emergency under California Government Code, California Emergency Services Act (Article 2, Section 8558). Including a list of and contacts for all cities or counties for which the Supplier provides service in the WSCP, along with developed coordination protocols, can facilitate compliance with this section of the Water Code in the event of a local emergency as defined in subpart (c) of Government Code Section 8558.
The cities and counties in the EMWD service area are shown in Table 11.
Water Shortage Contingency Plan Eastern Municipal Water District 20 Table 11. City and County Coordination on Proclamation of Emergencies City or County Contact
Riverside County Emergency Management Department
City of Hemet Emergency Services Coordinator
City of Perris Emergency Services Coordinator
City of San Jacinto Emergency Services Coordinator
City of Beaumont Emergency Services Coordinator
City of Canyon Lake Emergency Services Coordinator
City of Menifee Emergency Services Coordinator
City of Moreno Valley Emergency Services Coordinator
City of Murrieta Emergency Services Coordinator
City of Perris Emergency Services Coordinator
City of Riverside Emergency Services Coordinator
City of San Jacinto Emergency Services Coordinator
City of Temecula Emergency Services Coordinator
This section describes the anticipated financial consequences to EMWD of implementing the WSCP. The description includes potential reductions in revenue due to lower water sales and increased expenses associated with implementing the shortage response actions.
Potential financial impacts could include
Reduced revenue from reduced water use
Increased staff costs for tracking, reporting, patrolling, and enforcing restrictions Economic impacts associated with water-dependent businesses in the service area Potential mitigation measures include
Adjusting customer water budgets to increase the volume of water billed at the higher rate using financial reserves
reducing operation and maintenance expenses
deferring capital improvement projects
reducing future projected operation and maintenance expenses increasing fixed readiness-to-serve charge
•increasing commodity charge and water adjustment rates to cover revenue shortfalls other financial management mechanisms
As a result of a water shortage or emergency situation, there may be a reduction of revenue from water sales. To protect EMWD from financial hardship in such a situation, a financial reserve account (Rate Stabilization Reserve) has been established to meet the fixed costs associated with water delivery that may not be met in the case of reduced water sales.
Potential impacts to EMWD are summarized in Table 12, and potential mitigation measures are summarized in Table 13.
Water Shortage Contingency Plan Eastern Municipal Water District 21 Table 12. Actions and Conditions that Impact Revenue and Expenditures Type Category Description
Reduction in
Revenue
Reduced Water Sales Water sales are approximately 40% of EMWD’s annual revenue. A reduction in the demand of water by 50% would also mean a reduction in revenue from water sales of 50% leaving a shortfall of approximately 20% of EMWD annual revenue. This reduction would be offset in part by a reduction in the cost of water purchased from Metropolitan.
Increase in
Expenditures
Increased Staff Cost Staff costs for implementing the WSCP could vary depending on the stage triggered by a deficiency in water supply. Stages 1 and 2 would probably be implemented with only current staff members. Stages 3 or 4 of the plan may require
additional staff to implement. The amount and level of staff will vary greatly depending on the public’s response to the plan.
Increase in
Expenditures
O&M Cost Operations and maintenance cost may be minimally impacted by the implementation of the WSCP, but these
costs are projected to have minimal impact on EMWD’s total revenue.
Increase in
Expenditures
Cost of Supply and
Treatment
Cost of supply would decrease due to a decrease in demand and would offset some of the costs associated with reduced water sales.
Increase in
Expenditures
Public Outreach Costs Costs associated with informing the public about implementing the WSCP will vary based on the public’s
response and the stage of the plan implemented.
Table 13 Measures to Mitigate Fiscal Consequences
Name of Measure Summary of Effect
Rate Adjustment Part of the WSCP is the ability to impose a penalty rate. This could offset some of the lost revenue due to a decrease in water sales.
Reserve Policy
EMWD, as a matter of policy, keeps a reserve of funds equivalent to 90 days of operational expenses. This reserve fund could be used to mitigate revenue shortfalls.
Rate Stabilization Fund EMWD has a rate stabilization fund available to offset increased costs and decreased sales.
This section describes how the agency will monitor and report on implementation of the WSCP. EMWD will gather data on key water use metrics and use the data to evaluate the effectiveness of response actions in achieving their intended water use reduction purposes. EMWD will also gather data on customer compliance to evaluate the effectiveness of enforcement actions. EMWD will gather and report data at frequencies adequate to meet reporting requirements established by the State Water Resources Control Board and other government agencies.
EMWD will monitor water use by customers using its billing systems and operational control systems to monitor production and consumption. EMWD measures and determines the actual water savings made Water Shortage Contingency Plan Eastern Municipal Water District 22 by implementing each stage of the WSCP by relying on water meters that record the production and consumption of water. Each level of the WSCP has an associated target reduction for metered water use.
EMWD will monitor the implementation of this plan to evaluate its effectiveness as an adaptive management tool. The monitoring and reporting program described in Section 9 will provide information on the effectiveness of the shortage response actions during any shortage levels that may be invoked. If EMWD determines that the shortage response actions are not effective in producing the desired results, it will initiate a process to refine the WSCP. EMWD will consider the addition of new shortage response actions, or changing the levels when shortage response actions are implemented. Suggestions for refinements will be collected from agency staff, customers, industry experts, and the general public.
EMWD will work with Metropolitan and EMWD’s wholesale customers to share data and suggestions for refinement to identify opportunities to increase the effectiveness of the WSCP while maintaining alignment with other agencies in the region when possible.
EMWD will review the WSCP’s description of procedures for the Annual Assessment each year while preparing the Annual Assessment and make adjustments as needed.
EMWD has distinguished swimming pools and spas as recreational water features, while non-pool and non-spa water features are considered decorative water features. This distinction is used in the shortage response actions because decorative water features have the potential to use recycled water, while pools and spas (recreational water features) must use potable water for health and safety considerations.
EMWD adopted this WSCP with the 2020 UWMP. The UWMP and WSCP were made available for public review during May of 2021. A public hearing was held on June 30, 2021 to allow public input on the draft UWMP and the WSCP.
EMWD’s board of directors considered adoption of the UWMP and the WSCP at a meeting on June 30, 2021. The resolution of adoption is included as an attachment.
This WSCP will be submitted to DWR through the WUEData portal on or before the deadline of July 1, 2021.
This WSCP will be available to the public on the agency’s web site. Notice will be provided to cities and counties in the service area that the WSCP is available on the agency’s web site.
If EMWD identifies the need to amend this WSCP, it will follow the same procedures for notification to cities, counties and the public as used for the UWMP and for initial adoption of the WSCP. The draft amended WSCP will be made available for public review, and the agency’s governing board will hold a public hearing to receive comments on the draft amended WSCP. Once the agency’s governing board adopts the amended WSCP, the amended plan will be submitted to DWR and the California State Library, and it will be made available to the public and the cities and counties in the service area through placement on the agency’s web site.
Water Shortage Contingency Plan Eastern Municipal Water District 23 ARTICLE 10 – WATER SHORTAGE CONTINGENCY PLAN1
5.1001 DECLARATION OF PURPOSE AND PRINCIPLES
In accordance with Water Code 10632 requirements, Eastern Municipal Water District (EMWD) is responsible for conserving the available water supply, protecting the integrity of water supply facilities (infrastructure), and implementing a contingency plan in times of drought, supply reductions, failure of water distribution systems or emergencies. Particular emphasis is placed on use of domestic (potable) water, sanitation, fire protection, and preserving public health, welfare, and safety, in addition to minimizing the adverse impacts of water supply shortage or other water supply emergency conditions that do not include recycled water.
Therefore, EMWD hereby adopts regulations and restrictions on the delivery and consumption of water use during water shortages.
Financial Impacts
In the event that EMWD was to implement the Water Shortage Contingency Plan (the Plan), it is recognized that the reductions in sales would impact the revenues that would normally be generated. To the extent that this reduction negatively impacts the coverage of its fixed related costs (those that are not tied to volume), EMWD will utilize its Rate Stabilization Reserve to mitigate any shortfall.
Priorities
The Plan is based on the following priorities:
Public safety, healthy, and welfare
Sustaining economic vitality
Quality of life
5.1002 PUBLIC EDUCATION
EMWD will periodically provide the public with information about the Plan, including conditions under which each stage of the Plan is to be initiated or terminated and the conservation response measures to be implemented in each stage. This information will be provided by means of public events, website, press releases, bill inserts, etc.
5.1003 COORDINATION WITH REGIONAL WATER PLANNING GROUPS 11 Article 10 added to Title 5 by Resolution No. 2014-033 on March 26, 2014.
Water Shortage Contingency Plan Eastern Municipal Water District 24 Coordination and implementation of this Plan are in concert with regional water planning groups including MWD and EMWD sub-agencies – Lake Hemet Municipal Water District, Nuevo Water Company, Rancho California Water District, and the cities of Perris, Hemet, and San Jacinto.
5.1004 SHORTAGE DECLARATION PROCESS
(a) Long and Short Term Water Deficiencies
Driven by the requirements outlined in Water Code 10632, and the demand for potable water expected to be in excess of the water supply, EMWD’s General Manager shall request the Board of Directors to authorize and implement the provisions of the Plan. The request shall be made at a regular or special meeting of the Board of Directors, to implement provisions of the Plan.
The Board of Directors has the authority to initiate or terminate the water shortage contingency measures described in this Plan.
(b) Emergency Water Shortage Response
By adopting this Plan, the Board of Directors authorizes the General Manager to declare the extent of a potable water shortage emergency and to implement the appropriate water shortage contingency measures. The General Manager shall report such water shortage conditions and the level of response to the Board of Directors in a timely manner.
The declaration of the Board of Directors shall be made by public announcement and shall be published in a newspaper of general circulation. The declaration shall become effective immediately upon such publication.
5.1005 APPLICATION
The water shortage contingency measures of the Plan shall apply to all persons, customers, and properties utilizing potable water provided by EMWD. The terms “person” and “customer” as used in the Plan include individuals, corporations, partnerships, agencies, associations, and all other legal entities.
5.1006 DEFINITIONS
For the purposes of this Plan, the following definitions shall apply:
Commercial, Industrial, and Institutional (CII): Includes, but is not limited to, any type of nonprofit establishments, governmental entities, schools, retail establishments, hotels, motels, restaurants, car washes, and office buildings.
Conservation: Those practices, techniques, and technologies that reduce the consumptions of Water Shortage Contingency Plan Eastern Municipal Water District 25 water, reduce the loss or waste of water, improve the efficiency in the use of water or increase the recycling and reuse of water so that supply is conserved and made available for future or alternative uses.
Customer: Any person, company, agency, or organization using water supplied by EMWD.
EMWD: Eastern Municipal Water District.
Domestic water: Used for personal needs or for household or sanitary purposes such as drinking, bathing, cooking, sanitation, or for cleaning a residence, business, industry, or institution. Also used for landscape irrigation.
Household: Residential premises served by the customer’s meter.
Landscape irrigation use: The irrigation and maintenance of landscaped areas, whether publicly or privately owned, including residential and commercial lawns, gardens, golf courses, parks, rights-of-way and medians.
Long Term Shortage: A prolonged shortage of water supplies expected to last at least a year.
Potable water: Filtered/treated water suitable for drinking; also used for household needs and landscape irrigation.
Short Term Shortage: A shortage of water supplies expected to last less than a year.
Water Shortage Contingency Plan: The Plan as defined by this document.
Water shortage: A condition in which the existing or projected potable water supply available to EMWD is not adequate to meet the water requirements of its customers. This condition may be the result of factors including, but not limited to, voluntary or mandatory curtailment of EMWD’s allocation from the MWD, drought, emergency conditions or failures of water distribution systems.
Water shortage period: The period beginning on the effective date of the Board of Director’s approval of implementing EMWD’s Water Shortage Contingency Plan, and ending on the date of the Board of Director’s finding that a potable water shortage no longer exists.
5.1007 PROCESS FOR INITIATION/TERMINATION OF WATER SHORTAGE
CONTINGENCY STAGES AND MODIFICATION OF ACTIONS TAKEN IN EACH STAGE2
The General Manager will recommend the appropriate stage of response to a water shortage based on the best information available at the time. Conditions that will be 2 Section 5.1007 amended by Resolution No. 2014-098 on July 2, 2014.
Water Shortage Contingency Plan Eastern Municipal Water District 26 considered include:
EMWD water supply conditions and storage levels
Statewide water supply conditions
Local water supply and demand conditions
MWD Water Supply Allocation Plan implementation or other actions requiring a reduction in water demand
Actions by surrounding agencies
As water supply conditions either deteriorate or improve, the General Manager will return to the Board to revise the appropriate stage of response. It shall not be necessary to implement any stage prior to another; the stages may be implemented in any reasonable order.
In the event the State or local agencies, through executive action, emergency legislation or other actions, impose conditions, requirements, or procedures that are not included in the District water shortage Contingency Plan, the General Manager is authorized to implement such measures as are reasonably required to bring the District’s actions in each stage into functional conformity with such conditions, requirements, or procedures.
5.1008 PUBLIC NOTIFICATION PROCEDURES
When EMWD determines that a potable water shortage condition exists, any or all of the following notification procedures may be implemented:
(a) Notify the general public stakeholders, elected officials and other key decision-makers regarding the situation, actions to be taken, goals customers are intended to achieve, and how these actions will be implemented. (b) The public at large will be informed of the situation and actions EMWD will be taking. Communications will occur through any of the following: billing inserts, special mailings, telephone contact, e-mail, social media, roadway signage, water conservation booths, and other booths in the community, speaker’s bureau, community association meetings, newsletters, and education programs, etc. Literature appropriate to the drought circumstance will be provided regarding the potable water shortage condition, conservation methods, and water-savings devices.
(c) Use of all forms of media will be employed. This would include public service announcements on radio and cable television, social media as well as earned media and advertisements in local newspapers.
Water Shortage Contingency Plan Eastern Municipal Water District 27 (d) EMWD’s web site, www.emwd.org, will be the central location for messaging and customer communications.
5.1009 WATER SHORTAGE CONTINGENCY PLAN STAGES AND ENFORCEMENT3 EMWD will implement an appropriate stage based on current water conditions. Higher stages will be implemented as shortages continue and/or if customer response does not bring about desired water savings. Restrictions, penalties, and enforcement will build on each other as higher stages are implemented.
Stage 1: Supply Watch
At this stage, efforts will be focused on encouraging voluntary reduction of up to 10 percent.
Customers can reduce demand by following the water use efficiency requirements of Section 5, Article 6 - Water Conservation of the Administrative Code. Other actions may be encouraged as appropriate.
Demand reduction will be encouraged through the on-going enforcement listed in Section 5, Article 6 - Water Conservation of the Administrative Code including EMWD’s water budget based tiered rate and penalties for run off.
Stage 2: Supply Alert
At this stage efforts will be focused on a voluntary reduction of up to 25 percent. Customers can reduce demand by following the water use efficiency requirements of Section 5, Article 6 - Water Conservation of the Administrative Code. Voluntary customer actions could include the following:
(a) Reduce watering or irrigating of lawn, landscape or other vegetated areas with sprinklers by one day a week;
(b) All leaks, breaks, or other malfunctions in the water user’s plumbing or distribution system repaired within 48 hours;
(c) Refrain from filling or re-filling of ornamental lakes or ponds; and (d) Refrain from using potable water to wash or clean a vehicle, including but not limited to, any automobile, truck, van, bus, motorcycle, boat or trailer, whether motorized or not.
Demand reduction will be encouraged through the ongoing enforcement listed in Section 5, 3 Section 5.1009 amended by Resolution No. 2015-011 on March 18, 2015; amended by Resolution No. 2015-103 on August 19, 2015; amended by Resolution No. 2016-016 on January 20, 2016; amended by Resolution No 2017-152 on December 20, 2017.
Water Shortage Contingency Plan Eastern Municipal Water District 28 Article 6 - Water Conservation of the Administrative Code including EMWD’s water budget based tiered rate and penalties for run off.
Stage 3: Mandatory Waste Reduction
At this stage, efforts will be focused on a mandatory reduction of excessive water use.
Customers can reduce demand by following the conserving actions detailed in Stages 1 and 2.
Demand reduction will be enforced through changes to EMWD’s water budget- based tiered rate structure and observation-based penalties:
For tiered customers:
(a) Stage 3a: No variances or adjustments will be allowed for filling swimming pools, establishing landscape or leaks that are not repaired within 48 hours;
(b) Stage 3b: Excessive tier budgets (Tier 3 Budgets for residential customers, Tier 2 Budgets for non-residential) will be decreased by up to 50 percent; and
(c) Stage 3c: Excessive tier budgets (Tier 3 Budgets for residential customers, Tier 2 Budgets for non-residential) will be decreased by up to 100 percent.
Observation of any water waste in opposition to restrictions listed in Section 5, Article 6 - Water Conservation of the Administrative Code or under this or any previous stage of the Plan are subject to the following penalties:
(a) For multi-family, commercial, institutional, industrial, agricultural, and landscape accounts:
(1) For the first violation, the District shall issue a written notice of fact of such violation to the Customer;
(2) For a second violation a surcharge in the amount of $100.00 shall be added to the Customer’s water bill;
(3) For a third violation a surcharge in the amount of $200.00 shall be added to the Customer’s water bill; and
(4) For a fourth and any subsequent violation a surcharge of $300.00 shall be added to the Customer’s water bill.
(b) For single-family residential accounts:
(1) For the first violation, the District shall issue a written notice of fact of such violation to the Customer;
Water Shortage Contingency Plan Eastern Municipal Water District 29 (2) For a second violation a surcharge in the amount of $25.00 shall be added to the Customer’s water bill;
(3) For a third violation a surcharge in the amount of $50.00 shall be added to the Customer’s water bill; and
(4) For a fourth and any subsequent violation a surcharge of $100.00 shall be added to the Customer’s water bill.
Stage 4: Mandatory Outdoor Reduction
At this stage efforts will be focused on a mandatory reduction of outdoor water use.
Customers can reduce demand by following the conserving actions required in Stages 1 through 3 and limiting watering or irrigating of lawn, landscape or other vegetated areas with sprinklers to the following schedule:
(a) June through August – A maximum of two days a week; and (b) September through May – A maximum of one day a week.
Demand reduction will be enforced through changes to EMWD’s water budget based tiered rate structure and observation based penalties:
For tiered customers:
(a) Stage 4a: Outdoor water budgets will be decreased by 10 percent; (b) Stage 4b: Outdoor water budgets will be decreased by up to 50 percent; and
(c) Stage 4c: Outdoor water budgets will be decreased by up to 100 percent and the irrigation of non-functional turf by multi-family residential, commercial, industrial, and institutional customers is prohibited.
Observation of any water waste in opposition to restrictions listed in Section 5, Article 6 - Water Conservation of the Administrative Code or under this or any previous stage of the Plan, or the irrigation of non-functional turf by multi-family residential, commercial, industrial, and institutional customers when the District is in Stage 4c or higher are subject to the following penalties:
(a) For multi-family, commercial, institutional, industrial, agricultural, and landscape accounts:
(1) For the first violation, the District shall issue a written notice of fact of such violation to the Customer;
(2) For a second violation a surcharge in the amount of $200.00 shall be added to the Customer’s water bill;
(3) For a third violation a surcharge in the amount of $400.00 shall Water Shortage Contingency Plan Eastern Municipal Water District 30 be added to the Customer’s water bill; and
(4) For a fourth and any subsequent violation a surcharge of $600.00 shall be added to the Customer’s water bill.
(b) For single-family residential accounts:
(1) For the first violation, the District shall issue a written notice of fact of such violation to the Customer;
(2) For a second violation a surcharge in the amount of $50.00 shall be added to the Customer’s water bill;
(3) For a third violation a surcharge in the amount of $100.00 shall be added to the Customer’s water bill; and
(4) For a fourth and any subsequent violation a surcharge of $200.00 shall be added to the Customer’s water bill.
Stage 5: Mandatory Indoor Reduction
At this stage efforts will be focused on a mandatory reduction of indoor water use. This stage would only be implemented in response to a catastrophic loss of supplies requiring a 50 percent or more reduction in demand.
Demand reduction will be enforced through changes to EMWD’s water budget based tiered rate structure and penalties for run off as detailed in Section 5, Article 6 - Water Conservation of the Administrative Code:
For tiered customers:
(a) Stage 5a: Indoor water budgets will be decreased by 10 percent; (b) Stage 5b: Indoor water budgets will be decreased by up to 30 percent; and
(c) Stage 5c: Indoor water budgets will be decreased by up to 50 percent.
Commercial, Industrial, Institutional, Agricultural customers and any other customer without a water budget will be given a water budget based on historical water use. Allocations will be decreased in stages and the current Tier 4 rate will be applied to any use above the decreased allocation.
(a) Stage 5a: Budgets will be decreased by 10 percent;
(b) Stage 5b: Budgets will be decreased by up to 30 percent; and (c) Stage 5c: Budgets will be decreased by up to 50 percent.
Restrictions and penalties implemented in earlier stages shall also remain in effect.
5.1010 APPEALS PROCESS
All variance requests and appeals will be processed according to Section 5, Article 6 – Water Shortage Contingency Plan Eastern Municipal Water District 31 Water Conservation of the Administrative Code.
5.1011 WHOLESALE SUPPLY ALLOCATION AND PENALTIES
During mandatory water shortage stages, wholesale customers will be required to reduce their retail water demand equivalent to EMWD’s retail water demand reduction. If MWD has limited supply allocations to EMWD and other member agencies; supply to wholesale customers may be allocated using a formula and methodology based on the MWD Water Supply Allocation Plan.
Potential penalties for not reducing demand could be up to 4 times the MWD Tier 2 rate.
Water Shortage Contingency Plan Eastern Municipal Water District 32 J
Appendix J: Notices of
Preparation and Public
Hearing
January 19, 2021
Ian Achimore
Santa Ana Watershed Project Authority
11615 Sterling Ave
Riverside, CA 92503
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Achimore:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Stephen Ajobiewe
City of Perris
101 N. D Street
Perris, CA 92570
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Ajobiewe:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Jack Bebee
Fallbrook Public Utility District
990 E Mission Rd
Fallbrook, CA 92028
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Bebee:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Edgar Fandialan / Tiffany Tran
Metropolitan Water District
P.O. Box 54153
Los Angeles, CA 90054-0153
[email protected] / [email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Fandialan / Ms. Tran:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Stuart Fisk
City of Temecula
41000 Main St
Temecula, CA 92589
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Fisk:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Ryan Fowler
City of Menifee
29844 Haun Rd
Menifee, CA 92586
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Fowler:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Travis Holyoak
City of Hemet
3777 Industrial Ave
Hemet, CA 92545
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Holyoak:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Parag Kalaria
Elsinore Valley Municipal Water District
31315 Chaney St
Lake Elsinore, CA 92530
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Kalaria:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Carole Kendrick
City of Beaumont
550 E 6th St
Beaumont, CA 92223
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Ms. Kendrick:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Tom Kennedy
Rainbow Municipal Water District
3707 Old Hwy 395
Fallbrook, CA 92028
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Kennedy:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Jeff Kirshberg
Rancho California Water District
42135 Winchester Rd
Temecula, CA 92590
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Kirshberg:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Kenneth McLaughlin
Soboba Band of Luiseno Indians
P.O. Box 487
San Jacinto, CA 92581
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. McLaughlin:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Jim Morrissey
City of Canyon Lake
31516 Railroad Canyon Rd
Canyon Lake, CA 92587
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Morrissey:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Behrooz Mortazavi
Hemet-San Jacinto Watermaster Advisor
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Mortazavi:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Matthew Osborn
City of San Jacinto
595 S. San Jacinto Ave
San Jacinto, CA 92583
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Osborn:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Pechanga Band of Luiseno Indians
P.O. Box 1477
Temecula, CA 92593
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update To Whom It May Concern:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Michael Plinski
Riverside Public Utilities
3901 Orange St
Riverside, CA 92501
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Plinski:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Jarrett Ramaiya
City of Murrieta
1 Town Square
Murrieta, CA 92562
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Ramaiya:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Cindi Robbins
Nuevo Water Company
30427 11th St
Nuevo, CA 92567
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Ms. Robbins:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Ryan Shaw / Melissa Matlock
Western Municipal Water District
14205 Meridian Pkwy
Riverside, CA 92518
[email protected] / [email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Shaw / Ms. Matlock:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Jason Venable
Lake Hemet Municipal Water District
P.O. Box 5039
Hemet, CA 92544-0039
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Venable:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Steve Weiss
County of Riverside
4080 Lemon St
Riverside, CA 92501
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Weiss:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Michael Wolfe / Michael Lloyd
City of Moreno Valley
P.O. Box 88005
Moreno Valley, CA 92552
[email protected] / [email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Mr. Wolfe and Mr. Lloyd:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s water supplies and water use efficiency over a long-term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928- 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
January 19, 2021
Julia Ekstrom
California Department of Water Resources
1416 9th Street
Sacramento, CA 95814
[email protected]
VIA ELECTRONIC MAIL
Subject: Notification of Urban Water Management Plan Update Dear Ms. Ekstrom:
Eastern Municipal Water District (EMWD) is currently preparing an update to its Urban Water Management Plan (UWMP), which evaluates EMWD’s watersupplies and water use efficiency over a long‐term planning horizon. An UWMP is required to be prepared by every urban water supplier (as defined in the California Water Code) and must be updated every five years for calendar years ending in zero (0) or five (5). The 2020 update is due to the California Department of Water Resources on July 1, 2021.
Prior to adoption of the 2020 UWMP, EMWD will be holding a public hearing to review the updated plan and to accept comments. EMWD will provide further notice once this hearing has been scheduled. A draft of the plan will be made available for review once it has been completed, and a final UWMP will be available to the public after it has been adopted.
Should you have any questions regarding the UWMP update process, please contact me by phone at (951) 928‐ 3777 ext. 4512, or via email at [email protected].
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
GN:ag
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:57 PM
To: [email protected]
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - City of Beaumont.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Carole Kendrick
City of Beaumont
550 E 6th Street
Beaumont, CA 92223
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Ms. Kendrick:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:57 PM
To: [email protected]
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - City of Canyon Lake.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Jim Morrissey
City of Canyon Lake
31516 Railroad Canyon Road
Canyon Lake, CA 92587
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Morrissey:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:56 PM
To: 'Travis Holyoak'
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - City of Hemet.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Travis Holyoak
City of Hemet
3777 Industrial Avenue
Hemet, CA 92545
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Holyoak:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:56 PM
To: [email protected]
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - City of Menifee.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Ryan Fowler
City of Menifee
29844 Haun Road
Menifee, CA 92586
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Fowler:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:56 PM
To: Michael Lloyd, P.E.; [email protected]
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - City of Moreno Valley.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Michael Wolfe / Michael Lloyd
City of Moreno Valley
P.O. Box 88005
Moreno Valley, CA 92552
[email protected] / [email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Wolfe / Mr. Lloyd:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:55 PM
To: [email protected]
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - City of Murrieta.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Jarrett Ramaiya
City of Murrieta
1 Town Square
Murrieta, CA 92562
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Ramaiya:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:52 PM
To: Ajobiewe, Stephen
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - City of Perris.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Stephen Ajobiewe
City of Perris
101 N. D Street
Perris, CA 92570
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Ajobiewe:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:52 PM
To: [email protected]
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - City of San Jacinto.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Matthew Osborn
City of San Jacinto
595 S. San Jacinto Avenue
San Jacinto, CA 92583
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Osborn:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:52 PM
To: [email protected]
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - City of Temecula.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Stuart Fisk
City of Temecula
41000 Main Street
Temecula, CA 92589
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Fisk:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:51 PM
To: [email protected]
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - County of Riverside.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Steve Weiss
County of Riverside
4080 Lemon Street
Riverside, CA 92501
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Weiss:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:51 PM
To: [email protected]
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - Elsinore Valley MWD.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Parag Kalaria
Elsinore Valley Municipal Water District
31315 Chaney Street
Lake Elsinore, CA 92530
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Kalaria:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:51 PM
To: [email protected]
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - Fallbrook Public Utility District.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Jack Bebee
Fallbrook Public Utility District
990 E Mission Road
Fallbrook, CA 92028
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Bebee:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:48 PM
To: Behrooz Mortazavi
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - HSJ Watermaster.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Behrooz Mortazavi
Hemet-San Jacinto Watermaster Advisor
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Mortazavi:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:48 PM
To: [email protected]
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - LHMWD.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Jason Venable
Lake Hemet Municipal Water District
P.O. Box 5039
Hemet, CA 92544-0039
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Venable:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:47 PM
To: '[email protected]'; [email protected]
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - MWD.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Edgar Fandialan / Tiffany Tran
Metropolitan Water District
P.O. Box 54153
Los Angeles, CA 90054-0153
[email protected] / [email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Fandialan / Ms. Tran:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:47 PM
To: Robbins, Cinthia
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - Nuevo Water Co.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Cindi Robbins
Nuevo Water Company
30427 11th Street
Nuevo, CA 92567
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Ms. Robbins:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:46 PM
To: [email protected]
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - Pechanga.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Pechanga Band of Luiseno Indians
P.O. Box 1477
Temecula, CA 92593
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing To Whom It May Concern:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:57 PM
To: [email protected]
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - Rainbow MWD.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Tom Kennedy
Rainbow Municipal Water District
3707 Old Hwy 395
Fallbrook, CA 92028
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Kennedy:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:45 PM
To: '[email protected]'
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - Rancho California Water District.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Jeff Kirshberg
Rancho California Water District
42135 Winchester Road
Temecula, CA 92590
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Kirshberg:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:45 PM
To: Michael Plinski
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - Riverside Public Utilities.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Michael Plinski
Riverside Public Utilities
3901 Orange Street
Riverside, CA 92501
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Plinski:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:45 PM
To: '[email protected]'
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - Soboba.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Kenneth McLaughlin
Soboba Band of Luiseño Indians
P.O. Box 487
San Jacinto, CA 92581
[email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. McLaughlin:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
1 Copeland, Stena
From: Copeland, Stena
Sent: Tuesday, June 15, 2021 3:45 PM
To: Ryan Shaw ([email protected]); [email protected]
Subject: EMWD's 2020 Urban Water Management Plan / Public Hearing Date Change Attachments: 2021 Rescheduled Adoption Hearing Notice - WMWD.pdf Good afternoon:
Please see the attached correspondence regarding EMWD’s 2020 Urban Water Management Plan update.
Feel free to contact Gordon Ng at [email protected] if you should have any questions or call (951) 928‐3777 extension 4512.
Thank you,
Stena Copeland
Executive Assistant
Water Resources & Facilities Planning
(951) 928‐3777 extension 4227
June 15, 2021
Ryan Shaw / Melissa Matlock
Western Municipal Water District
14205 Meridian Parkway
Riverside, CA 92518
[email protected] / [email protected]
VIA ELECTRONIC MAIL
Subject: Rescheduled 2020 Urban Water Management Plan Public Hearing Dear Mr. Shaw and Ms. Matlock:
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608). The UWMP contains an evaluation of EMWD’s projected supplies and demands, updates to its Water Shortage Contingency Plan, a report on its compliance with the Water Conservation Act of 2009, and information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1. The draft document is available for review on EMWD’s website at the following location: https://www.emwd.org/post/urban-water-management-plan A public hearing to allow community input on the 2020 UWMP has been rescheduled from 9:00 AM on June 16, 2021 to 8:00 AM on June 30, 2021. The location of the public hearing, the EMWD headquarters located at 2270 Trumble Road, Perris, CA, has not been changed. EMWD will also consider written comments on the UWMP sent to the attention of Gordon Ng by email at [email protected] or by mail to Eastern Municipal Water District, P.O. Box 8300, Perris, CA 92572-8300. Comments should be received by June 30, 2021.
Sincerely,
Gordon Ng, P.E.
Principal Water Resources Specialist
Notice of Rescheduled Public Hearing to Adopt the 2020 Urban Water Management Plan, Update the Water Shortage Contingency Plan, Demonstrate Compliance with the Water Conservation Act of 2009, and Demonstrate Reduced Delta Reliance
The Eastern Municipal Water District (EMWD) has prepared a Draft 2020 Urban Water Management Plan (UWMP) in compliance with the requirements established by the Urban Water Management Planning Act (California Water Code §10610-10656 and §10608), which applies to urban water suppliers that either provide over 3,000 acre-feet of water annually, or serve more than 3,000 urban connections.
The UWMP contains an evaluation of EMWD’s projected supplies and demands as well as EMWD’s reliability under a range of drought scenarios. EMWD is also required to update its Water Shortage Contingency Plan, report on its compliance with the Water Conservation Act of 2009, and include information demonstrating reduced reliance on the Sacramento-San Joaquin Delta under Delta Plan Policy WR P1.
This Public Notice officially notifies the general public that the Draft 2020 UWMP is available for public review at District headquarters located at 2270 Trumble Road or on EMWD’s website at www.emwd.org. Comments or requests for additional information should be sent by mail to:
Eastern Municipal Water District
Attention: Gordon Ng
P.O. Box 8300
Perris, CA 92572-8300
Or by email to:
Gordon Ng
[email protected]
Public input is encouraged. Email or written comments are due by June 30, 2021 and will be considered during the finalization of the 2020 UWMP.
The public hearing of the EMWD Board of Directors previously scheduled for 9:00 AM on June 16, 2021 has been rescheduled to 8:00 AM on June 30, 2021 to allow community input on the 2020 UWMP, updates to the Water Shortage Contingency Plan, and compliance with the Water Conservation Act of 2009 and Delta Plan Policy WR P1. The public hearing will be held at 8:00 AM on June 30, 2021 at the EMWD headquarters located at:
Eastern Municipal Water District
2270 Trumble Road
Perris, CA 92572
K
Appendix K: Resolutions of
Adoption
L
Appendix L: Reduced Delta
Reliance
1 Quantifying Regional Self-Reliance and
Reduced Reliance on Water Supplies from
the Delta Watershed
1. Background
Under the Sacramento-San Joaquin Delta Reform Act of 2009, state and local public agencies proposing a covered action in the Delta, prior to initiating the implementation of that action, must prepare a written certification of consistency with detailed findings as to whether the covered action is consistent with applicable Delta Plan policies and submit that certification to the Delta Stewardship Council. Anyone may appeal a certification of consistency, and if the Delta Stewardship Council grants the appeal, the covered action may not be implemented until the agency proposing the covered action submits a revised certification of consistency, and either no appeal is filed, or the Delta Stewardship Council denies the subsequent appeal.
An urban water supplier that anticipates participating in or receiving water from a proposed covered action such as a multi-year water transfer, conveyance facility, or new diversion that involves transferring water through, exporting water from, or using water in the Delta should provide information in their 2015 and 2020 Urban Water Management Plans (UWMPs) that can then be used in the covered action process to demonstrate consistency with Delta Plan Policy WR P1, Reduce Reliance on the Delta Through Improved Regional Water Self-Reliance (WR P1).
WR P1 details what is needed for a covered action to demonstrate consistency with reduced reliance on the Delta and improved regional self-reliance. WR P1 subsection (a) states that:
(a) Water shall not be exported from, transferred through, or used in the Delta if all the following apply:
(1) One or more water suppliers that would receive water as a result of the export, transfer, or use have failed to adequately contribute to reduced reliance on the Delta and improved regional self-reliance consistent with all of the requirements listed in paragraph (1) of subsection (c);
(2) That failure has significantly caused the need for the export, transfer, or use; and (3) The export, transfer, or use would have a significant adverse environmental impact in the Delta.
WR P1 subsection (c)(1) further defines what adequately contributing to reduced reliance on the Delta means in terms of (a)(1) above.
(c)(1) Water suppliers that have done all the following are contributing to reduced reliance on the Delta and improved regional self-reliance and are therefore consistent with this policy:
(A) Completed a current Urban or Agricultural Water Management Plan (Plan) which has been reviewed by the California Department of Water Resources for compliance with the applicable requirements of Water Code Division 6, Parts 2.55, 2.6, and 2.8; (B) Identified, evaluated, and commenced implementation, consistent with the implementation schedule set forth in the Plan, of all programs and projects included in the Plan that are locally cost effective and technically feasible which reduce reliance on the Delta; and
(C) Included in the Plan, commencing in 2015, the expected outcome for measurable reduction in Delta reliance and improvement in regional self-reliance. The expected outcome for measurable reduction in Delta reliance and improvement in regional self- 2 reliance shall be reported in the Plan as the reduction in the amount of water used, or in the percentage of water used, from the Delta watershed. For the purposes of reporting, water efficiency is considered a new source of water supply, consistent with Water Code section 1011(a).
The analysis and documentation provided below include all the elements described in WR P1(c)(1) that need to be included in a water supplier’s UWMP to support a certification of consistency for a future covered action.
2. Demonstration of Regional Self-Reliance
The methodology used to determine improved regional self-reliance for the Eastern Municipal Water District (EMWD) is consistent with the approach detailed in DWR’s UWMP Guidebook Appendix C, including the use of narrative justifications for the accounting of supplies and the documentation of specific data sources. Some of the key assumptions underlying EMWD’s demonstration of reduced reliance include:
All data were obtained from the current 2020 UWMP or previously adopted UWMPs and represent average or normal water year conditions.
All analyses were conducted at the service area level, and all data reflect the total contributions of EMWD and its customers.
No projects or programs that are described in the UWMPs as “Projects Under Development” were included in the accounting of supplies.
EMWD has coordinated this analysis with documentation prepared by the Metropolitan Water District of Southern California (Metropolitan), of which EMWD is a member agency.
Baseline and Expected Outcomes
To calculate the expected outcomes for measurable reduction in Delta reliance and improved regional self-reliance, a baseline is needed to compare against. This analysis uses a normal water year representation of 2010 as the baseline, which is consistent with the approach described in the Guidebook Appendix C.
Documentation of the specific data sources and assumptions are included in the discussions below.
Service Area Demands without Water Use Efficiency
In alignment with the Guidebook Appendix C, this analysis uses normal water year demands, rather than normal water year supplies to calculate expected outcomes in terms of the percentage of water used. Using normal water year demands serves as a proxy for the amount of supplies that would be used in a normal water year, which helps alleviate issues associated with how supply capability is presented to fulfill requirements of the UWMP Act versus how supplies might be accounted for to demonstrate consistency with WR P1.
Because WR P1 considers water use efficiency savings a source of water supply, water suppliers can calculate their embedded water use efficiency savings based on changes in forecasted per capita water use since the baseline. As explained in the Guidebook Appendix C, water use efficiency savings must be added back to the normal year demands to represent demands without water use efficiency savings accounted for; otherwise, the effect of water use efficiency savings on regional self-reliance would be overestimated. Table C-1 shows the results of this adjustment for EMWD. Supporting narratives and documentation for all the data shown in Table C-1 are provided below.
Service Area Demands with Water Use Efficiency
The service area demands shown in Table C-1 represent the total water demands for EMWD’s retail and wholesale service area. The demand data shown in Table C-1 were collected from the following sources:
3 Baseline (2010): EMWD 2015 UWMP Table 6-1 and 6-2, groundwater management plan records, and sub-agency coordination and 2010 UWMPs
2015: EMWD 2015 UWMP Table 6-1 and 6-2, groundwater management plan records, and subagency coordination and 2015 UWMPs 2020: EMWD 2020 UWMP Table 6-13, groundwater management plan records, and sub-agency coordination
2025-2045: EMWD 2020 UWMP, Table 6-15 and 6-16 and sub-agency coordination Non-Potable Water Demands
EMWD operates four Regional Water Reclamation Facilities to provide recycled water for both municipal and agricultural purposes, as discussed in Chapter 6 of the 2020 UWMP. The non-potable water demand data shown in Table C-1 represents recycled water demand estimates from these facilities for use in EMWD’s service area collected from the following sources:
Baseline (2010): EMWD 2015 UWMP Table 6-1 and 6-2
2015: EMWD 2015 UWMP Table 6-1 and 6-2
2020: EMWD 2020 UWMP Table 6-13
2025-2045: EMWD 2020 UWMP, Table 6-15 and 6-16
Potable Service Area Demands with Water Use Efficiency
The “Potable Service Area Demands with Water Use Efficiency” was calculated by subtracting the “Non-Potable Water Demands” from “Service Area Demands with Water Use Efficiency.” Service Area Population
The population data shown in Table 1 were collected from the following sources:
Baseline (2010): EMWD 2015 UWMP, Table 3-2
2015: EMWD 2015 UWMP, Table 3-3
2020-2045: EMWD 2020 UWMP, Table 3-3
Estimated Water Use Efficiency Since Baseline
The “Estimated Water Use Efficiency Since Baseline” was calculated using “Potable Service Area Demands with Water Use Efficiency” divided by “Service Area Population” and then comparing with 2010 Per Capita Water Use.
Service Area Water Demands without Water Use Efficiency In Table C-2, the “Service Area Demands with Water Use Efficiency” was added to the “Estimated Water Use Efficiency Since Baseline” to obtain the “Service Area Water Demands without Water Use Efficiency Accounted For”.
Supplies Contributing to Regional Self-Reliance
For a covered action to demonstrate consistency with the Delta Plan, WR P1 subsection (c)(1)(C) states that water suppliers must report the expected outcomes for measurable improvement in regional self-reliance. EMWD’s local supplies include recycled water, potable groundwater, and desalinated groundwater. Through the Local Resources Program, Metropolitan has contributed to the development of these local supplies. More information about EMWD’s supply portfolio is provided in Chapter 6 of the UWMP.
Table C-3 shows expected outcomes for supplies contributing to regional self-reliance both in amount and as a percentage. The numbers shown in Table C-3 represent efforts to improve regional selfreliance for EMWD’s entire service area and include the total contributions of EMWD and its customers.
Supporting narratives and documentation for all the data shown in Table C-3 are provided below. 4 Water Use Efficiency
The water use efficiency information shown in Table C-3 is taken directly from Table C-1. More information about EMWD’s water use efficiency programs and demand management measures is included in Chapter 9 of EMWD’s UWMP.
Water Recycling
The water recycling values shown in Table C-3 are based on recycled water that was produced for past years, and on projections of recycled water production for future years.
Advanced Water Technologies
The advanced water technologies data shown in Table C-3 includes production from EMWD’s desalters, as described in Chapter 6 of EMWD’s 2020 UWMP. The data shown in Table C-3 originated from the following sources:
Baseline (2010): EMWD 2015 UWMP, Table 6-1 and 6-2
2015: EMWD 2015 UWMP, Table 6-1 and 6-2
2020: EMWD 2020 UWMP, Table 6-13
2025-2045: EMWD 2020 UWMP, Table 6-15 and 6-16
Local and Regional Water Supply and Storage Programs
The local and regional water supply and storage programs data shown in Table C-3 represent groundwater pumping estimates by entities within EMWD’s service area and were estimated from the following sources:
Baseline (2010): EMWD 2015 UWMP, Table 6-1 and 6-2, groundwater management plan records, and sub-agency coordination and 2010 UWMPs
2015: EMWD 2015 UWMP, Table 6-1 and 6-2, groundwater management plan records, and subagency coordination and 2015 UWMPs 2020: EMWD 2020 UWMP, Table 6-13, groundwater management plan records, and sub-agency coordination
2025-2045: EMWD 2020 UWMP, Table 6-15 and 6-16 and sub-agency coordination
3. Reliance on Water Supplies from the Delta Watershed
EMWD is a member agency of Metropolitan, which is a contractor to the State Water Project.
Metropolitan has prepared an analysis of regional reliance on supplies from the Delta watershed. The discussion below was prepared by Metropolitan to describe the region’s efforts to reduce reliance on supplies from the Delta.
Metropolitan’s service area, as a whole, reduces reliance on the Delta through investments in non-Delta water supplies, local water supplies, and regional and local demand management measures.
Metropolitan’s member agencies coordinate reliance on the Delta through their membership in Metropolitan, a regional cooperative providing wholesale water service to its 26 member agencies.
Accordingly, regional reliance on the Delta can only be measured regionally—not by individual Metropolitan member agencies and not by the customers of those member agencies.
Metropolitan’s member agencies, and those agencies’ customers, indirectly reduce reliance on the Delta through their collective efforts as a cooperative. Metropolitan’s member agencies do not control the amount of Delta water they receive from Metropolitan. Metropolitan manages a statewide integrated conveyance system consisting of its participation in the State Water Project (SWP), its Colorado River Aqueduct (CRA) including Colorado River water resources, programs and water exchanges, and its regional storage portfolio. Along with the SWP, CRA, storage programs, and Metropolitan’s conveyance and distribution facilities, demand management programs increase the future reliability of water resources for the region. In addition, demand management programs provide system-wide 5 benefits by decreasing the demand for imported water, which helps to decrease the burden on Metropolitan’s infrastructure and reduce system costs, and free up conveyance capacity to the benefit of all member agencies.
Metropolitan’s costs are funded almost entirely from its service area, except for grants and other assistance from government programs. Most of Metropolitan’s revenues are collected directly from its member agencies. Properties within Metropolitan’s service area pay a property tax that currently provides approximately 8 percent of the fiscal year 2021 annual budgeted revenues. The rest of Metropolitan’s costs are funded through rates and charges paid by Metropolitan’s member agencies for the wholesale services it provides to them. Thus, Metropolitan’s member agencies fund nearly all operations Metropolitan undertakes to reduce reliance on the Delta, including Colorado River Programs, storage facilities, Local Resources Programs and Conservation Programs within Metropolitan’s service area.
Because of the integrated nature of Metropolitan’s systems and operations, and the collective nature of Metropolitan’s regional efforts, it is infeasible to quantify each of Metropolitan member agencies’ individual reliance on the Delta. It is infeasible to attempt to segregate an entity and a system that were designed to work as an integrated regional cooperative.
In addition to the member agencies funding Metropolitan’s regional efforts, they also invest in their own local programs to reduce their reliance on any imported water. Moreover, the customers of those member agencies may also invest in their own local programs to reduce water demand. However, to the extent those efforts result in reduction of demands on Metropolitan, that reduction does not equate to a like reduction of reliance on the Delta. Demands on Metropolitan are not commensurate with demands on the Delta because most of Metropolitan member agencies receive blended resources from Metropolitan as determined by Metropolitan—not the individual member agency—and for most member agencies, the blend varies from month-to-month and year-to-year due to hydrology, operational constraints, use of storage and other factors.
Colorado River Programs
As a regional cooperative of member agencies, Metropolitan invests in programs to ensure the continued reliability and sustainability of Colorado River supplies. Metropolitan was established to obtain an allotment of Colorado River water, and its first mission was to construct and operate the CRA.
The CRA consists of five pumping plants, 450 miles of high voltage power lines, one electric substation, four regulating reservoirs, and 242 miles of aqueducts, siphons, canals, conduits and pipelines terminating at Lake Mathews in Riverside County. Metropolitan owns, operates, and manages the CRA.
Metropolitan is responsible for operating, maintaining, rehabilitating, and repairing the CRA, and is responsible for obtaining and scheduling energy resources adequate to power pumps at the CRA’s five pumping stations.
Colorado River supplies include Metropolitan’s basic Colorado River apportionment, along with supplies that result from existing and committed programs, including supplies from the Imperial Irrigation District (IID)-Metropolitan Conservation Program, the implementation of the Quantification Settlement Agreement (QSA) and related agreements, and the exchange agreement with San Diego County Water Authority (SDCWA). The QSA established the baseline water use for each of the agreement parties and facilitates the transfer of water from agricultural agencies to urban uses. Since the QSA, additional programs have been implemented to increase Metropolitan’s CRA supplies. These include the PVID Land Management, Crop Rotation, and Water Supply Program, as well as the Lower Colorado River Water Supply Project. The 2007 Interim Guidelines provided for the coordinated operation of Lake Powell and Lake Mead, as well as the Intentionally Created Surplus (ICS) program that allows Metropolitan to store water in Lake Mead.
6 Storage Investments/Facilities
Surface and groundwater storage are critical elements of Southern California’s water resources strategy and help Metropolitan reduce its reliance on the Delta. Because California experiences dramatic swings in weather and hydrology, storage is important to regulate those swings and mitigate possible supply shortages. Surface and groundwater storage provide a means of storing water during normal and wet years for later use during dry years, when imported supplies are limited. The Metropolitan system, for purposes of meeting demands during times of shortage, regulating system flows, and ensuring system reliability in the event of a system outage, provides over 1,000,000 acrefeet of system storage capacity. Diamond Valley Lake provides 810,000 acre feet of that storage capacity, effectively doubling Southern California’s previous surface water storage capacity. Other existing imported water storage available to the region consists of Metropolitan’s raw water reservoirs, a share of the SWP’s raw water reservoirs in and near the service area, and the portion of the groundwater basins used for conjunctive‐use storage.
Since the early twentieth century, DWR and Metropolitan have constructed surface water reservoirs to meet emergency, drought/seasonal, and regulatory water needs for Southern California. These reservoirs include Pyramid Lake, Castaic Lake, Elderberry Forebay, Silverwood Lake, Lake Perris, Lake Skinner, Lake Mathews, Live Oak Reservoir, Garvey Reservoir, Palos Verdes Reservoir, Orange County Reservoir, and Metropolitan’s Diamond Valley Lake (DVL). Some reservoirs such as Live Oak Reservoir, Garvey Reservoir, Palos Verdes Reservoir, and Orange County Reservoir, which have a total combined capacity of about 3,500 AF, are used solely for regulating purposes. The total gross storage capacity for the larger remaining reservoirs is 1,757,600 AF. However, not all of the gross storage capacity is available to Metropolitan; dead storage and storage allocated to others reduce the amount of storage that is available to Metropolitan to 1,665,200 AF.
Conjunctive use of the aquifers offers another important source of dry year supplies. Unused storage in Southern California groundwater basins can be used to optimize imported water supplies, and the development of groundwater storage projects allows effective management and regulation of the region’s major imported supplies from the Colorado River and SWP. Over the years, Metropolitan has implemented conjunctive use through various programs in the service area; the following table lists the groundwater conjunctive use programs that have been developed in the region. 7 Metropolitan Demand Management Programs
Demand management costs are Metropolitan’s expenditures for funding local water resource development programs and water conservation programs. These Demand Management Programs incentivize the development of local water supplies and the conservation of water to reduce the need to import water to deliver to Metropolitan’s member agencies. These programs are implemented below the delivery points between Metropolitan’s and its member agencies’ distribution systems and, as such, do not add any water to Metropolitan’s supplies. Rather, the effect of these downstream programs is to produce a local supply of water for the local agencies and to reduce demands by member agencies for water imported through Metropolitan’s system. The following discussions outline how Metropolitan funds local resources and conservation programs for the benefit of all of its member agencies and the entire Metropolitan service area. Notably, the history of demand management by Metropolitan’s member agencies and the local agencies that purchase water from Metropolitan’s members has spanned more than four decades. The significant history of the programs is another reason it would be difficult to attempt to assign a portion of such funding to any one individual member agency.
Local Resources Programs
In 1982, Metropolitan began providing financial incentives to its member agencies to develop new local supplies to assist in meeting the region’s water needs. Because of Metropolitan’s regional distribution system, these programs benefit all member agencies regardless of project location because they help 8 to increase regional water supply reliability, reduce demands for imported water supplies, decrease the burden on Metropolitan’s infrastructure, reduce system costs and free up conveyance capacity to the benefit of all the agencies that rely on water from Metropolitan.
For example, the Groundwater Replenishment System (GWRS) operated by the Orange County Water District is the world’s largest water purification system for indirect potable reuse. It was funded, in part, by Metropolitan’s member agencies through the Local Resources Program. Annually, the GWRS produces approximately 103,000 acre-feet of reliable, locally controlled, drought-proof supply of highquality water to recharge the Orange County Groundwater Basin and protect it from seawater intrusion.
The GWRS is a premier example of a regional project that significantly reduced the need to utilize imported water for groundwater replenishment in Metropolitan’s service area, increasing regional and local supply reliability and reducing the region’s reliance on imported supplies, including supplies from the State Water Project.
Metropolitan’s local resource programs have evolved through the years to better assist Metropolitan’s member agencies in increasing local supply production. The following is a description and history of the local supply incentive programs.
Local Projects Program
In 1982, Metropolitan initiated the Local Projects Program (LPP), which provided funding to member agencies to facilitate the development of recycled water projects. Under this approach, Metropolitan contributed a negotiated up-front funding amount to help finance project capital costs. Participating member agencies were obligated to reimburse Metropolitan over time. In 1986, the LPP was revised, changing the up-front funding approach to an incentive-based approach. Metropolitan contributed an amount equal to the avoided State Water Project pumping costs for each acre-foot of recycled water delivered to end-use consumers. This funding incentive was based on the premise that local projects resulted in the reduction of water imported from the Delta and the associated pumping cost. The incentive amount varied from year to year depending on the actual variable power cost paid for State Water Project imports. In 1990, Metropolitan’s Board increased the LPP contribution to a fixed rate of $154 per acre-foot, which was calculated based on Metropolitan’s avoided capital and operational costs to convey, treat, and distribute water, and included considerations of reliability and service area demands.
Groundwater Recovery Program
The drought of the early 1990s sparked the need to develop additional local water resources, aside from recycled water, to meet regional demand and increase regional water supply reliability. In 1991, Metropolitan conducted the Brackish Groundwater Reclamation Study which determined that large amounts of degraded groundwater in the region were not being utilized. Subsequently, the Groundwater Recovery Program (GRP) was established to assist the recovery of otherwise unusable groundwater degraded by minerals and other contaminants, provide access to the storage assets of the degraded groundwater, and maintain the quality of groundwater resources by reducing the spread of degraded plumes.
Local Resources Program
In 1995, Metropolitan’s Board adopted the Local Resources Program (LRP), which combined the LPP and GRP into one program. The Board allowed for existing LPP agreements with a fixed incentive rate to convert to the sliding scale up to $250 per acre-foot, similar to GRP incentive terms. Those agreements that were converted to LRP are known as “LRP Conversions.” Competitive Local Projects Program
In 1998, the Competitive Local Resources Program (Competitive Program) was established. The Competitive Program encouraged the development of recycled water and recovered groundwater through a process that emphasized cost-efficiency to Metropolitan, timing new production according to regional need while minimizing program administration cost. Under the Competitive Program, agencies 9 requested an incentive rate up to $250 per acre-foot of production over 25 years under a Request for Proposals (RFP) for the development of up to 53,000 acre-feet per year of new water recycling and groundwater recovery projects. In 2003, a second RFP was issued for the development of an additional 65,000 acre-feet of new recycled water and recovered groundwater projects through the LRP.
Seawater Desalination Program
Metropolitan established the Seawater Desalination Program (SDP) in 2001 to provide financial incentives to member agencies for the development of seawater desalination projects. In 2014, seawater desalination projects became eligible for funding under the LRP, and the SDP was ended. 2007 Local Resources Program
In 2006, a task force comprised of member agency representatives was formed to identify and recommend program improvements to the LRP. As a result of the task force process, the 2007 LRP was established with a goal of 174,000 acre-feet per year of additional local water resource development. The new program allowed for an open application process and eliminated the previous competitive process. This program offered sliding scale incentives of up to $250 per acre-foot, calculated annually based on a member agency’s actual local resource project costs exceeding Metropolitan’s prevailing water rate.
2014 Local Resources Program
A series of workgroup meetings with member agencies was held to identify the reasons why there was a lack of new LRP applications coming into the program. The main constraint identified by the member agencies was that the $250 per acre-foot was not providing enough of an incentive for developing new projects due to higher construction costs to meet water quality requirements and to develop the infrastructure to reach end-use consumers located further from treatment plants. As a result, in 2014, the Board authorized an increase in the maximum incentive amount, provided alternative payment structures, included onsite retrofit costs and reimbursable services as part of the LRP, and added eligibility for seawater desalination projects. The current LRP incentive payment options are structured as follows:
Option 1 – Sliding scale incentive up to $340/AF for a 25-year agreement term Option 2 – Sliding scale incentive up to $475/AF for a 15-year agreement term Option 3 – Fixed incentive up to $305/AF for a 25-year agreement term On-site Retrofit Programs
In 2014, Metropolitan’s Board also approved the On-site Retrofit Pilot Program which provided financial incentives to public or private entities toward the cost of small-scale improvements to their existing irrigation and industrial systems to allow connection to existing recycled water pipelines. The On-site Retrofit Pilot Program helped reduce recycled water retrofit costs to the end-use consumer which is a key constraint that limited recycled water LRP projects from reaching full production capacity. The program incentive was equal to the actual eligible costs of the on-site retrofit, or $975 per acre-foot of up-front cost, which equates to $195 per acre-foot for an estimated five years of water savings ($195/AF x 5 years) multiplied by the average annual water use in previous three years, whichever is less. The Pilot Program lasted two years and was successful in meeting its goal of accelerating the use of recycled water.
In 2016, Metropolitan’s Board authorized the On-site Retrofit Program (ORP), with an additional budget of $10 million. This program encompassed lessons learned from the Pilot Program and feedback from member agencies to make the program more streamlined and improve its efficiency. As of fiscal year 2019/20, the ORP has successfully converted 440 sites, increasing the use of recycled water by 12,691 acre-feet per year.
10 Stormwater Pilot Programs
In 2019, Metropolitan’s Board authorized both the Stormwater for Direct Use Pilot Program and a Stormwater for Recharge Pilot Program to study the feasibility of reusing stormwater to help meet regional demands in Southern California. These pilot programs are intended to encourage the development, monitoring, and study of new and existing stormwater projects by providing financial incentives for their construction/retrofit and monitoring/reporting costs. These pilot programs will help evaluate the potential benefits delivered by stormwater capture projects and provide a basis for potential future funding approaches. Metropolitan’s Board authorized a total of $12.5 million for the stormwater pilot programs ($5 million for the District Use Pilot and $7.5 million for the Recharge Pilot).
Current Status and Results of Metropolitan’s Local Resource Programs
Today, nearly one-half of the total recycled water and groundwater recovery production in the region has been developed with an incentive from one or more of Metropolitan’s local resource programs.
During fiscal year 2020, Metropolitan provided about $13 million for production of 71,000 acre-feet of recycled water for non-potable and indirect potable uses. Metropolitan provided about $4 million to support projects that produced about 50,000 acre-feet of recovered groundwater for municipal use.
Since 1982, Metropolitan has invested $680 million to fund 85 recycled water projects and 27 groundwater recovery projects that have produced a cumulative total of about 4 million acre-feet.
Conservation Programs
Metropolitan’s regional conservation programs and approaches have a long history. Decades ago, Metropolitan recognized that demand management at the consumer level would be an important part of balancing regional supplies and demands. Water conservation efforts were seen as a way to reduce the need for imported supplies and offset the need to transport or store additional water into or within the Metropolitan service area. The actual conservation of water takes place at the retail consumer level.
Regional conservation approaches have proven to be effective at reaching retail consumers throughout Metropolitan’s service area and successfully implementing water saving devices, programs and practices. Through the pooling of funding by Metropolitan’s member agencies, Metropolitan is able to engage in regional campaigns with wide-reaching impact. Regional investments in demand management programs, of which conservation is a key part along with local supply programs, benefit all member agencies regardless of project location. These programs help to increase regional water supply reliability, reduce demands for imported water supplies, decrease the burden on Metropolitan’s infrastructure, reduce system costs, and free up conveyance capacity to the benefit of all member agencies.
Incentive-Based Conservation Programs
Conservation Credits Program
In 1988, Metropolitan’s Board approved the Water Conservation Credits Program (Credits Program).
The Credits Program is similar in concept to the Local Projects Program (LPP). The purpose of the Credits Program is to encourage local water agencies to implement effective water conservation projects through the use of financial incentives. The Credits Program provides financial assistance for water conservation projects that reduce demands on Metropolitan’s imported water supplies and require Metropolitan’s assistance to be financially feasible.
Initially, the Credits Program provided 50 percent of a member agency’s program cost, up to a maximum of $75 per acre-foot of estimated water savings. The $75 Base Conservation Rate was established based Metropolitan’s avoided cost of pumping SWP supplies. The Base Conservation Rate has been revisited by Metropolitan’s Board and revised twice since 1988, from $75 to $154 per acrefoot in 1990 and from $154 to $195 per acre-foot in 2005.
In fiscal year 2020 Metropolitan processed more than 30,400 rebate applications totaling $18.9 million. 11 Member Agency Administered Program
Some member agencies also have unique programs within their service areas that provide local rebates that may differ from Metropolitan’s regional program. Metropolitan continues to support these local efforts through a member agency administered funding program that adheres to the same funding guidelines as the Credits Program. The Member Agency Administered Program allows member agencies to receive funding for local conservation efforts that supplement, but do not duplicate, the rebates offered through Metropolitan’s regional rebate program.
Water Savings Incentive Program
There are numerous commercial entities and industries within Metropolitan’s service area that pursue unique savings opportunities that do not fall within the general rebate programs that Metropolitan provides. In 2012, Metropolitan designed the Water Savings Incentive Program (WSIP) to target these unique commercial and industrial projects. In addition to rebates for devices, under this program, Metropolitan provides financial incentives to businesses and industries that created their own custom water efficiency projects. Qualifying custom projects can receive funding for permanent water efficiency changes that result in reduced potable demand.
Non-Incentive Conservation Programs
In addition to its incentive-based conservation programs, Metropolitan also undertakes additional efforts throughout its service area that help achieve water savings without the use of rebates. Metropolitan’s non-incentive conservation efforts include:
residential and professional water efficient landscape training classes water audits for large landscapes
research, development and studies of new water saving technologies advertising and outreach campaigns
community outreach and education programs
advocacy for legislation, codes, and standards that lead to increased water savings Current Status and Results of Metropolitan’s Conservation Programs
Since 1990, Metropolitan has invested $824 million in conservation rebates that have resulted in a cumulative savings of 3.27 million acre-feet of water. These investments include $450 million in turf removal and other rebates during the last drought which resulted in 175 million square feet of lawn turf removed. During fiscal year 2020, 1.06 million acre-feet of water is estimated to have been conserved.
This annual total includes Metropolitan’s Conservation Credits Program; code-based conservation achieved through Metropolitan-sponsored legislation; building plumbing codes and ordinances; reduced consumption resulting from changes in water pricing; and pre-1990 device retrofits.
Infeasibility of Accounting Regional Investments in Reduced Reliance Below the Regional Level
The accounting of regional investments that contribute to reduced reliance on supplies from the Delta watershed is straightforward to calculate and report at the regional aggregate level. However, any similar accounting is infeasible for the individual member agencies or their customers. As described above, the region (through Metropolitan) makes significant investments in projects, programs and other resources that reduce reliance on the Delta. In fact, all of Metropolitan’s investments in Colorado River supplies, groundwater and surface storage, local resources development and demand management measures that reduce reliance on the Delta are collectively funded by revenues generated from the member agencies through rates and charges.
12 Metropolitan’s revenues cannot be matched to the demands or supply production history of an individual agency, or consistently across the agencies within the service area. Each project or program funded by the region has a different online date, useful life, incentive rate and structure, and production schedule. It is infeasible to account for all these things over the life of each project or program and provide a nexus to each member agency’s contributions to Metropolitan’s revenue stream over time.
Accounting at the regional level allows for the incorporation of the local supplies and water use efficiency programs done by member agencies and their customers through both the regional programs and through their own specific local programs. As shown above, despite the infeasibility of accounting reduced Delta reliance below the regional level, Metropolitan’s member agencies and their customers have together made substantial contributions to the region’s reduced reliance.
Because of this infeasibility to separate out the individual member agency’s reduced reliance on the Delta, Metropolitan has completed the analysis to demonstrate a regional wide reduction which is shown in Table C-4.
4. Summary of Expected Outcomes for Reduced Reliance on the Delta As stated in WR P1(c)(1)(C), the policy requires that, commencing in 2015, UWMPs include expected outcomes for measurable reduction in Delta reliance and improved regional self- reliance. WR P1 further states that those outcomes shall be reported in the UWMP as the reduction in the amount of water used, or in the percentage of water used, from the Delta.
The expected outcomes for Eastern Municipal Water District’s Delta reliance and regional self-reliance were developed using the approach and guidance described in Appendix C of DWR’s Urban Water Management Plan Guidebook 2020 (Guidebook Appendix C) issued in March 2021.
Regional Self-Reliance
The data used to demonstrate increased regional self-reliance in this analysis represent the total regional efforts of EMWD and its customers and were developed in conjunction with Metropolitan as part of the UWMP coordination process. In accordance with UMWP requirements, EMWD’s customers also report demands and supplies for their service areas in their respective UWMPs. The data reported by those agencies are not additive to the regional totals shown in EMWD’s UWMP, rather their reporting represents subtotals of the regional total and should be considered as such for the purposes of determining regional self-reliance.
The results show that EMWD and its customers are measurably reducing reliance on the Delta and improving regional self-reliance.
Reduced Reliance on Supplies from the Delta Watershed
For reduced reliance on supplies from the Delta Watershed, the data used in this analysis represent the total regional efforts of Metropolitan and its member agencies and their customers (many of them retail agencies) and were developed in conjunction with EMWD and other Metropolitan member agencies as part of the UWMP coordination process (as described in Section 5 of Metropolitan’s 2020 UWMP). In accordance with UMWP requirements, Metropolitan’s member agencies and their customers (many of them retail agencies) also report demands and supplies for their service areas in their respective UWMPs. The data reported by those agencies are not additive to the regional totals shown in Metropolitan’s UWMP, rather their reporting represents subtotals of the regional total and should be considered as such for the purposes of determining reduced reliance on the Delta.
While the demands that Metropolitan’s member agencies and their customers report in their UWMP’s are a good reflection of the demands in their respective service areas, they do not adequately represent each water suppliers’ individual contributions to reduced reliance on the Delta. To calculate and report their reliance on water supplies from the Delta watershed, water suppliers that receive water from the Delta through other regional or wholesale water suppliers would need to determine the amount of Delta water that they receive from the regional or wholesale supplier. Two specific pieces of information are 13 needed to accomplish this, first is the quantity of demands on the regional or wholesale water supplier that accurately reflect a supplier’s contributions to reduced reliance on the Delta and second is the quantity of a supplier’s demands on the regional or wholesale water supplier that are met by supplies from the Delta watershed.
For water suppliers that make investments in regional projects or programs it may be infeasible to quantify their demands on the regional or wholesale water supplier in a way that accurately reflects their individual contributions to reduced reliance on the Delta. Due to the extensive, long-standing, and successful implementation of regional demand management and local resource incentive programs in Metropolitan’s service area, this infeasibility holds true for Metropolitan’s members as well as their customers. For Metropolitan’s service area, reduced reliance on supplies from the Delta watershed can only be accurately accounted for at the regional level.
The results show that as a region, Metropolitan and its members (including EMWD) as well as their customers are measurably reducing reliance on the Delta and improving regional self-reliance.
5. UWMP Implementation
In addition to the analysis and documentation described above, WR P1 subsection (c)(1)(B) requires that all programs and projects included in the UWMP that are locally cost-effective and technically feasible, which reduce reliance on the Delta, are identified, evaluated, and implemented consistent with the implementation schedule. WR P1 (c)(1)(B) states that:
(B) Identified, evaluated, and commenced implementation, consistent with the implementation schedule set forth in the Plan, of all programs and projects included in the Plan that are locally cost effective and technically feasible which reduce reliance on the Delta[.] In accordance with Water Code Section 10631(f), water suppliers must already include in their UWMP a detailed description of expected future projects and programs that they may implement to increase the amount of water supply available to them in normal and single-dry water years and for a period of drought lasting five consecutive years. The UWMP description must also identify specific projects, include a description of the increase in water supply that is expected to be available from each project, and include an estimate regarding the implementation timeline for each project or program.
Chapter 6 of EMWD’s 2020 UWMP summarizes the implementation plan and continued progress in developing a diversified water portfolio to meet the region’s water needs.
6. 2015 UWMP Appendix M
The information contained in this appendix is also intended to be a new Appendix M to EMWD’s 2015 UWMP consistent with WR P1 subsection (c)(1)(C) (Cal. Code Regs. tit. 23, § 5003). EMWD provided notice of the availability of the draft 2020 UWMP, 2021 WSCP, and the new Appendix M to the 2015 UWMP and held a public hearing to consider adoption of the documents in accordance with CWC Sections 10621(b) and 10642, and Government Code Section 6066, and Chapter 17.5 (starting with Section 7290) of Division 7 of Title 1 of the Government Code. The public review drafts of the 2020 UWMP, Appendix M to the 2015 UWMP, and the 2021 WSCP were posted on EMWD’s website, emwd.org, in advance of the public hearing on June 30, 2021. The notice of availability of the documents was sent to EMWD’s customers, as well as cities and counties in EMWD’s service area.
Copies of the notification letter sent to the customers and cities and counties in EMWD’s service area are included in the 2020 UWMP Appendix J. Thus, this Appendix L to EMWD’s 2020 UWMP, which was adopted with EMWD’s 2020 UWMP, will also be recognized and treated as Appendix M to EMWD’s 2015 UWMP.
EMWD held the public hearing for the draft 2020 UWMP, draft Appendix M to the 2015 UWMP, and draft 2021 WSCP on June 30, 2021, at a regular Board of Directors meeting, with an option to join virtually due to COVID-19 concerns. EMWD’s Board of Directors determined that the 2020 UWMP and the 2021 WSCP accurately represent the water resources plan for EMWD’s service area. In addition, 14 EMWD’s Board of Directors determined that Appendix M to the 2015 UWMP and Appendix L to the 2020 UWMP include all of the elements described in Delta Plan Policy WR P1, Reduce Reliance on the Delta Through Improved Regional Water Self-Reliance (Cal. Code Regs. tit. 23, § 5003), which need to be included in a water supplier’s UWMP to support a certification of consistency for a future covered action. The EMWD Board of Directors adopted the 2020 UWMP, Appendix M to the 2015 UWMP, and the 2021 WSCP and authorized their submittal to the State of California. Copies of the resolutions are included in the 2020 UWMP Appendix K.
Reduced Reliance Calculation ‐ Data Template
Table C‐1: Optional Calculation of Water Use Efficiency ‐To be completed if Water Supplier does not specifically estimate Water Use Efficiency as a supply Service Area Water Use Efficiency Demands
(Acre‐Feet)
Baseline
(2010) 2015 2020 2025 2030 2035 2040
2045
(Optional)
Service Area Water Demands with Water Use Efficiency Accounted For 196,100 172,878 189,932 216,953 245,050 251,073 263,740 274,962Non‐Potable Water Demands 47,834 46,326 41,569 52,800 59,200 57,200 62,800 67,400 Potable Service Area Demands with Water Use Efficiency Accounted For 148,266 126,552 148,363 164,153 185,850 193,873 200,940 207,562 Total Service Area Population
Baseline
(2010) 2015 2020 2025 2030 2035 2040
2045
(Optional)
Service Area Population 720,669 761,221 859,160 921,207 983,255 1,045,302 1,088,325 1,131,348 Water Use Efficiency Since Baseline
(Acre‐Feet)
Baseline
(2010) 2015 2020 2025 2030 2035 2040
2045
(Optional)
Per Capita Water Use (GPCD) 184 148 154 159 169 166 165 164 Change in Per Capita Water Use from Baseline (GPCD) (35) (30) (25) (15) (18) (19) (20) Estimated Water Use Efficiency Since Baseline 30,057 28,395 25,371 16,438 21,181 22,965 25,194 Table C‐2: Calculation of Service Area Water Demands Without Water Use Efficiency Total Service Area Water Demands
(Acre‐Feet)
Baseline
(2010) 2015 2020 2025 2030 2035 2040
2045
(Optional)
Service Area Water Demands with Water Use Efficiency Accounted For 196,100 172,878 189,932 216,953 245,050 251,073 263,740 274,962 Reported Water Use Efficiency or Estimated Water Use Efficiency Since Baseline 30,057 28,395 25,371 16,438 21,181 22,965 25,194 Service Area Water Demands without Water Use Efficiency Accounted For 196,100 202,935 218,327 242,323 261,489 272,254 286,705 300,156 Table C‐3: Calculation of Supplies Contributing to Regional Self‐Reliance Water Supplies Contributing to Regional Self‐Reliance
(Acre‐Feet)
Baseline
(2010) 2015 2020 2025 2030 2035 2040
2045
(Optional)
Water Use Efficiency ‐ 30,057 28,395 25,371 16,438 21,181 22,965 25,194 Water Recycling 47,322 45,385 48,200 52,800 59,200 57,200 62,800 67,400 Stormwater Capture and UseAdvanced Water Technologies 5,787 7,288 7,310 13,400 13,400 13,400 13,400 13,400 Conjunctive Use Projects
Local and Regional Water Supply and Storage Projects 49,764 43,952 48,001 52,008 51,924 59,896 59,893 59,889 Other Programs and Projects the Contribute to Regional Self‐Reliance Water Supplies Contributing to Regional Self‐Reliance 102,873 126,681 131,907 143,578 140,962 151,677 159,058 165,883 Service Area Water Demands without Water Use Efficiency (Acre‐Feet)
Baseline
(2010) 2015 2020 2025 2030 2035 2040
2045
(Optional)
Service Area Water Demands without Water Use Efficiency Accounted For 196,100 202,935 218,327 242,323 261,489 272,254 286,705 300,156 Change in Regional Self Reliance
(Acre‐Feet)
Baseline
(2010) 2015 2020 2025 2030 2035 2040
2045
(Optional)
Water Supplies Contributing to Regional Self‐Reliance 102,873 126,681 131,907 143,578 140,962 151,677 159,058 165,883 Change in Water Supplies Contributing to Regional Self‐Reliance 23,808 29,033 40,705 38,089 48,804 56,185 63,010 Percent Change in Regional Self Reliance
(As Percent of Demand w/out WUE)
Baseline
(2010) 2015 2020 2025 2030 2035 2040
2045
(Optional)
Percent of Water Supplies Contributing to Regional Self‐Reliance 52.5% 62.4% 60.4% 59.3% 53.9% 55.7% 55.5% 55.3% Change in Percent of Water Supplies Contributing to Regional Self‐Reliance 10.0% 8.0% 6.8% 1.4% 3.3% 3.0% 2.8% Table C‐4: Calculation of Reliance on Water Supplies from the Delta Watershed Water Supplies from the Delta Watershed
(Acre‐Feet)
Baseline
(2010) 2015 2020 2025 2030 2035 2040
2045
(Optional)
CVP/SWP Contract Supplies 1,472,000 1,029,000 984,000 1,133,000 1,130,000 1,128,000 1,126,000 1,126,000 Delta/Delta Tributary DiversionsTransfers and Exchanges 20,000 44,000 91,000 58,000 52,000 52,000 52,000 52,000 Other Water Supplies from the Delta Watershed
Total Water Supplies from the Delta Watershed 1,492,000 1,073,000 1,075,000 1,191,000 1,182,000 1,180,000 1,178,000 1,178,000 Service Area Water Demands without Water Use Efficiency (Acre‐Feet)
Baseline
(2010) 2015 2020 2025 2030 2035 2040
2045
(Optional)
Service Area Water Demands without Water Use Efficiency Accounted For 5,493,000 5,499,000 5,219,000 4,938,000 5,032,000 5,156,000 5,261,000 5,374,000 Change in Supplies from the Delta Watershed
(Acre‐Feet)
Baseline
(2010) 2015 2020 2025 2030 2035 2040
2045
(Optional)
Water Supplies from the Delta Watershed 1,492,000 1,073,000 1,075,000 1,191,000 1,182,000 1,180,000 1,178,000 1,178,000 Change in Water Supplies from the Delta Watershed (419,000) (417,000) (301,000) (310,000) (312,000) (314,000) (314,000) Percent Change in Supplies from the Delta Watershed
(As a Percent of Demand w/out WUE)
Baseline
(2010) 2015 2020 2025 2030 2035 2040
2045
(Optional)
Percent of Water Supplies from the Delta Watershed 27.2% 19.5% 20.6% 24.1% 23.5% 22.9% 22.4% 21.9% Change in Percent of Water Supplies from the Delta Watershed ‐7.6% ‐6.6% ‐3.0% ‐3.7% ‐4.3% ‐4.8% ‐5.2%