Appendix A
Air Quality and Greenhouse Gas Emissions Analysis
Air Quality and Greenhouse Gas Analysis September 2026
City of Moreno Valley Page 1 of 15
MEMORANDUM
To: Steve Quintanilla, Moreno Valley City Attorney
CC: Angelica Frausto-Lupo, City of Moreno Valley Community Development Director From: Olivia Chan
Heidi Rous, CPP
Kimley-Horn and Associates, Inc.
Date: September 23, 2026
Subject: Air Quality and Greenhouse Gas Memorandum
Public Safety Campus Project
The City of Moreno Valley (City) proposes to implement the Public Safety Campus Project (Project), which consists of three primary components: (1) development of a Public Safety Campus (PSC); (2) construction of a Corporate Yard Fueling Station (CYFS); and (3) tenant improvements at existing civic center facilities throughout the City. All three components together comprise the Project. The Project also includes improvements to a drainage culvert and roadway improvements on nearby streets. These improvements would accommodate a range of civic uses identified in the City’s Capital Improvement Plan (CIP) and are intended to enhance emergency response capabilities, improve operational efficiency, and support the City’s growing public safety and municipal service needs as the City continues to grow.
PROJECT DESCRIPTION
Public Safety Campus
The Project would include the development and operation of a PSC, which would establish a centralized public safety hub, consisting of a new joint-use fire and police station, Emergency Operations Center (EOC), and a regional animal shelter. The PSC would improve interdepartmental coordination, increase operational efficiency, strengthen emergency preparedness, and provide enhanced public safety services for the City and surrounding region.
Fire Station
The Project proposes a two-story, 50,000 square foot (sf) fire station, designed to serve as a regional facility for the Riverside County Fire Department (RCFD). The fire station would accommodate approximately 58 employees by 2040. The fire station would include six drivethrough apparatus bays supporting Type 1 fire engines, squads, and tiller trucks. Apparatus bay support functions would include equipment and maintenance infrastructure, gear storage, decontamination, medical storage, regional hazardous materials support, and general personnel support. The fire station would also accommodate reserve apparatus, equipment and trailers, secure staff and command parking, and regional staging and Incident Command Post (ICP) functions.
The fire station would include fire administration, operational support, and firefighter living quarters. Living areas would include bunk rooms/sleeping quarters, bathrooms and showers, kitchen, dining and day room functions, clean-side laundry, and associated support spaces.
These areas would be located to provide rapid access to the apparatus bays while minimizing sound transfer between operational and sleeping areas.
Air Quality and Greenhouse Gas Analysis September 2026
City of Moreno Valley Page 2 of 15
Police Station
The Project would include a two-story, 90,0000 sf police station that would serve as a secure law enforcement facility with operational capacity comparable to that of the City's existing police station. The police station would accommodate approximately 210 employees by 2040. The police station would incorporate controlled public and secure access, a secure perimeter and parking area, and multiple ingress and egress routes while supporting command staff, administration, patrol, specialized units like traffic and community service, special enforcement teams, investigations, property and evidence, and training. A dedicated processing and holding area would be included with physically separated accommodations for juvenile detainees in accordance with applicable standards.
The police station would provide specialized operational, training, and technology spaces, including a Real-Time Crime Center (RTCC), Incident Command Center, dedicated Drone Program operations, armory and weapons maintenance areas, briefing and report-writing spaces, and a defensive tactics training room designed for both mat-based training and simulation exercises.
Additional spaces would support hard and soft interview functions, property and evidence processing and storage, staff locker and wellness areas, functional fitness, and community and multi-purpose training functions. Secure site areas would accommodate fleet and personal staff vehicles, motorcycles, traffic enforcement vehicles, specialized equipment and response vehicles, and provide dedicated holding-related parking stalls. The facility would enhance operational efficiency, maintain appropriate separation between public and secure pedestrian and vehicular circulation, enhance officer safety and emergency response capabilities, and promote community engagement while supporting the City's long-term public safety needs.
Emergency Operations Center
The Project would also include a two-story 30,000 sf EOC, that would serve as the City's primary emergency management and incident coordination facility. The EOC would accommodate five (5) full-time staff members, enhancing the capabilities of the City's existing emergency operations facilities. The EOC would be designed to support coordinated response and recovery efforts during emergencies, disasters, and other major incidents.
Animal Shelter
The Project would develop a two-story, 65,000 sf regional animal shelter that would occupy a range of 6 to 8-acres of the PSC. The animal shelter would accommodate approximately 58 fulltime staff members by 2040. The animal shelter would be designed to provide comprehensive animal care, adoption services, veterinary support, and community outreach functions. Key public and operational spaces would include a welcoming public lobby, dedicated adoption areas, a lowcost veterinary clinic, volunteer space, an administrative office hub, and a conference room with capacity for approximately 75 people.
Infrastructure Improvements
The PSC would incorporate supporting infrastructure, including an approximately 100-foot communications tower to provide reliable Citywide radio and data communications, that would ensure continuity of operations during emergency events. The PSC would also include a shared utility yard, approximately 3,000 sf to support all facilities on the PSC Site.
The PSC Site would also include site lighting, secure fencing and controlled-access gates, electric vehicle (EV) charging stations, ADA-compliant parking spaces and pedestrian pathways, Air Quality and Greenhouse Gas Analysis September 2026
City of Moreno Valley Page 3 of 15
emergency generators, fuel storage, general storage facilities, and other operational support amenities required for fire, police, and animal shelter functions. Additionally, covered parking areas may incorporate solar photovoltaic panels to support energy efficiency and sustainability goals.
Additional PSC Site improvements would include landscaping, hardscape, irrigation systems, site lighting, secure fencing and controlled-access gates, EV charging stations, ADA-compliant parking spaces and pedestrian pathways, emergency generators, fuel storage, general storage facilities, and other operational support amenities required for fire, police, and animal shelter functions.
Improvements to the existing on-site drainage channel would be constructed east of Redlands Boulevard and would extend beneath Redlands Boulevard, allowing stormwater flows to be conveyed across the roadway in a controlled manner. The PSC would leave a 30-ft buffer between the existing on-site drainage culvert and the Project Site development. The Project would also incorporate improvements to the existing on-site drainage channel to enhance flood protection and accommodate the proposed campus facilities in accordance with the Riverside County Flood Control and Water Conservation District's master plan. These drainage improvements would improve Project Site resiliency and reduce potential flood-related impacts to critical public safety infrastructure.
Off-site roadway improvements would include full-width improvements along Brodiaea Avenue from Wilmot Street to Redlands Boulevard and along Wilmot Street from Brodiaea Avenue to Cactus Avenue. Half-street improvements would be constructed along Redlands Boulevard from Campbell Avenue to Cactus Avenue and along Cactus Avenue from Redlands Boulevard to Goldenrod Street. Street improvements include new curbs, gutters, sidewalks, landscape, lighting, signage, pavement, and associated drainage facilities to accommodate new, improved roads. To improve traffic operations and enhance emergency response access, three new traffic signals would be installed at the intersections of Brodiaea Avenue and Redlands Boulevard, Redlands Boulevard and Cactus Avenue, and Cactus Avenue and Wilmot Street.
Corporate Yard Fueling Station
In addition to the improvements proposed at the PSC Site, the City would also construct the CYFS, a new aboveground fueling facility that would support the City’s growing municipal fleet demands and ensure reliable emergency fueling capabilities for critical operations. The Project would include the excavation and disposal of existing surface materials, followed by construction of two monolithic structural concrete pads extending two feet beyond each tank footprint. The unleaded gasoline tank pad would measure approximately 17 feet by 12 feet and would be protected by sixteen 8-inch-diameter concrete-filled steel bollards spaced four feet on center. The diesel tank pad would measure approximately 12 feet by 10 feet and would be protected by twelve similarly configured bollards.
The CYFS would include 4,000-gallon UL 2085 aboveground unleaded gasoline storage tank equipped with four tank-mounted dispensing pumps and a 1,000-gallon UL 2085 aboveground diesel storage tank equipped with two tank-mounted dispensing pumps. Both systems would include all associated components required for safe and compliant operation, including venting systems, fill assemblies, spill containment, overfill prevention devices, monitoring equipment, and fuel management controls.
Air Quality and Greenhouse Gas Analysis September 2026
City of Moreno Valley Page 4 of 15
The CYFS would be integrated with two Gasboy EKOS fuel management systems to provide secure fuel tracking, inventory management, and operational oversight. The contractor would be responsible for complete system installation, startup, programming, calibration, testing, commissioning, and coordination of all required regulatory inspections to ensure the fueling facility is fully operational and compliant with applicable standards.
METHODOLOGY AND ASSUMPTIONS
This air quality and greenhouse gas impact analysis considers construction and operational impacts associated with the Project. Where criteria air pollutant quantification was required, emissions were modeled using the California Air Resources Board (CARB)-approved California Emissions Estimator Model (CalEEMod) version 2022.1. CalEEMod is a Statewide land use emissions computer model designed to quantify potential criteria pollutant emissions associated with both construction and operations from a variety of land use projects. Impacts were assessed according to methodologies recommended by CARB and the South Coast AQMD.
Construction equipment, trucks, worker vehicles, and ground-disturbing activities associated with Project construction would generate emissions of criteria air pollutants and precursors. Daily regional construction emissions are estimated by assuming construction occurs at the earliest feasible date (i.e., a conservative estimate of construction activities) and applying off-road, fugitive dust, and on-road emissions factors in CalEEMod.
Project operations would result in emissions from mobile sources (motor vehicles from Projectgenerated vehicle trips), area sources (architectural coatings, consumer products, and landscaping equipment), and energy sources (electricity usage). Project-generated operational emissions would be predominantly associated with motor vehicle use. The Project vehicle trip generation was obtained from the Institute of Transportation Engineers (ITE) Trip Generation Manual, 12th Edition. Other operational emissions from area and energy sources were quantified in CalEEMod based on land use activity data.
The South Coast AQMD provides significance thresholds for emissions associated with construction and operations. The construction and operational emissions are compared to the daily criteria pollutant emissions significance thresholds in order to determine the significance of the Project’s impact.
To identify localized impacts to sensitive receptors, the South Coast AQMD recommends addressing LSTs for construction. LSTs were developed in response to South Coast AQMD Governing Boards’ Environmental Justice Enhancement Initiative (I-4). The South Coast AQMD provided the Final Localized Significance Threshold Methodology (dated June 2003 [revised 2008]) for guidance. The LST methodology assists lead agencies in analyzing localized impacts associated with Project-specific emissions.
South Coast AQMD’s LST guidance and corresponding thresholds are intended to assist CEQA lead agencies in evaluating a project’s potential local air quality impacts. The guidance is based on dispersion modeling using local meteorological and air quality data within Source Receptor Areas (SRAs) to estimate pollutant concentrations and potential impacts to sensitive receptors.
As noted by South Coast AQMD, LSTs represent “the maximum emissions from a project that will not cause or contribute to an exceedance of the most stringent applicable federal or state ambient Air Quality and Greenhouse Gas Analysis September 2026
City of Moreno Valley Page 5 of 15
air quality standard.”1 The methodology accounts for project size, distance from receptors, and emission dispersion patterns, recognizing that smaller project areas or sites closer to sensitive receptors generally result in higher pollutant concentrations and greater potential local impacts.
South Coast AQMD’s LST screening tables provide conservative mass-based emission thresholds (pounds per day) that ensure emissions below these thresholds will not result in localized air quality impacts. LSTs only take into consideration emissions of NOX, CO, PM10, and PM2.5.2 CalEEMod calculates construction emissions based on the number of equipment hours and the maximum daily soil disturbance activity possible for each piece of equipment.
The Final Localized Significance Threshold Methodology provides thresholds for projects disturbing 1-, 2-, and 5-acres in size. The South Coast AQMD’s methodology states that “off-site mobile emissions from the project should not be included in the emissions compared to LSTs.”3 Therefore, for purposes of the construction analysis, only South Coast AQMD localized significance threshold methodology, operational LSTs only apply to on-site stationary sources.4
AIR QUALITY IMPACT ANALYSIS
Regional Emissions
Regional Construction Emissions
Construction associated with the Project would generate short-term emissions of criteria air pollutants. The criteria pollutants of primary concern within the South Coast Air Basin (SCAB) include ozone (O3)-precursor pollutants (i.e., ROG and NOX), PM10, and PM2.5. Constructiongenerated emissions of these criteria pollutants would be short-term and of temporary duration, lasting only as long as construction activities occur, but would be considered a significant air quality impact if the volume of pollutants generated were to exceed the South Coast AQMD’s thresholds of significance.
Construction results in the temporary generation of emissions from site grading, road paving, motor vehicle exhaust associated with construction equipment and worker trips, and the movement of construction equipment, especially on unpaved surfaces. Emissions of airborne particulate matter are largely dependent on the amount of ground disturbance associated with site preparation activities, as well as weather conditions and the appropriate application of water.
Project construction is anticipated to begin as early as October 2027. Construction of the PSC includes site preparation, grading, building construction, paving, and architectural coating.
Construction of the CYFS includes demolition, site preparation, grading, and building construction. The Project also includes improvements along Brodiaea Avenue, Wilmot Street, Cactus Avenue, and Redlands Boulevard. Construction-generated emissions associated with Project implementation were calculated using CalEEMod, which is designed to model emissions for land use development projects based on typical construction requirements. It was conservatively assumed that all construction equipment operated during each individual phase would be operated simultaneously and that all components of the Project would begin construction in October 2027.
1 South Coast Air Quality Management District, Final Localized Significance Threshold Methodology, page 1-1, https://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significance-thresholds/final-lst-methodology-document.pdf.
Accessed September 2026. 2 South Coast Air Quality Management District, Final Localized Significance Threshold Methodology. 3 South Coast Air Quality Management District, Final Localized Significance Threshold Methodology. 4 South Coast Air Quality Management District, Final Localized Significance Threshold Methodology.
Air Quality and Greenhouse Gas Analysis September 2026
City of Moreno Valley Page 6 of 15
Fugitive dust emissions from construction may temporarily become a nuisance and potential health hazard to those living and working nearby. Project construction would comply with South Coast AQMD rules and regulations, including South Coast AQMD Rule 402 (Nuisance), Rule 403 (Fugitive Dust), and Rule 1113 (Architectural Coatings). South Coast AQMD Rule 402 prohibits the discharge of air contaminants or other material that cause a nuisance. South Coast AQMD Rule 403 requires fugitive dust control measures. South Coast AQMD Rule 1113 provides specifications on painting practices and regulates the ROG content of paint. Project construction would additionally comply with CARB’s anti-idling regulations, which prohibits heavy-duty diesel vehicle idling for more than five minutes.
See Appendix A: Air Quality Modeling Data for more information regarding the construction assumptions used in this analysis. The emissions associated with Project construction are reported in Table 1: Project Construction Emissions (Maximum Daily Pounds per Day) 1,2.
Table 1: Project Construction Emissions (Maximum Daily Pounds per Day) 1,2 Construction Year ROG NOX CO SO2 PM10 PM2.5
PSC 2027 3.12 28.04 29.16 0.06 6.51 3.76
CYFS 2027 1.02 8.73 9.94 0.02 2.08 1.07
Off-Site Improvements 20273 3.49 28.12 38.35 0.07 1.78 1.22 PSC 2028 2.96 24.41 28.41 0.06 5.29 2.10
CYFS 2028 0.46 4.30 6.91 0.01 0.15 0.14
Off-Site Improvements 20283 1.77 14.41 20.79 0.04 0.93 0.57 PSC 2029 49.31 10.47 19.60 0.03 2.14 0.73
Maximum 20274 7.63 64.89 77.45 0.15 10.37 6.05
Maximum 20284 5.19 43.12 56.11 0.11 6.37 2.81
Maximum 20294 49.31 10.47 19.60 0.03 2.14 0.73
Maximum Emissions 49.31 64.89 77.45 0.15 10.37 6.05
South Coast AQMD
Thresholds 75 100 550 150 150 55
Exceed South Coast AQMD
Threshold? No No No No No No
Notes:
ROG = Reactive Organic Gases; NOX = Nitrogen Oxides; CO = Carbon Monoxide; SO2 = Sulfur Dioxide; PM10 = Particulate Matter 10 microns in diameter or less; PM2.5 = Particulate Matter 2.5 microns in diameter or less
1. Worst-case seasonal maximum daily emissions are reported.
2. Mandatory compliance with South Coast AQMD Rule 403 Fugitive Dust assumed. Rule 403 reduction/credits include the following: properly maintain mobile and other construction equipment: water exposed surfaces three times daily; and limit speeds on unpaved roads to 25 miles per hour. Reductions percentages from the South Coast AQMD CEQA Handbook (Tables XI-A through XI-E) were applied.
3. Project includes the improvement of four roadways. CalEEMod accounts for the construction of one of those four roadways to represent the maximum daily emissions, as construction of all four roadways would not occur concurrently.
4. It is assumed that maximum daily emissions from each project component during each year would overlap.
Source: CalEEMod version 2022.1. Refer to Appendix A for the model outputs.
Table 1 shows the Project’s regional criteria pollutant emissions during construction would not exceed the applicable South Coast AQMD thresholds. Impacts would be less than significant.
Regional Operational Emissions
The Project’s operational emissions would be associated with mobile sources (motor vehicle use), area sources (landscape maintenance equipment, architectural coatings, and consumer products) and energy sources (electricity and natural gas usage). Long-term operational emissions attributable to the Project are summarized in Table 2: Project Operational Emissions (Maximum Daily Pounds per Day).
Air Quality and Greenhouse Gas Analysis September 2026
City of Moreno Valley Page 7 of 15
Table 2: Project Operational Emissions (Maximum Daily Pounds per Day) Source1 ROG NOX CO SO2 PM10 PM2.5
PSC Mobile2 14.79 14.67 137.47 0.38 36.63 9.46
PSC Area 8.15 0.11 13.59 <0.01 0.02 0.02
PSC Energy 0.10 1.74 1.46 0.01 0.13 0.13
PSC Emergency Generators 2.66 7.44 6.79 0.01 0.39 0.39
CYFS Mobile2 5.21 5.25 47.22 0.13 11.60 3.00
CYFS Fueling 0.12 -- -- -- -- --
Total Emissions 31.03 29.21 206.53 0.53 48.77 13.00
South Coast AQMD Threshold 55 55 550 150 150 55
South Coast AQMD Threshold
Exceeded? No No No No No No
Notes:
ROG = Reactive Organic Gases; NOX = Nitrogen Oxides; CO = Carbon Monoxide; SO2 = Sulfur Dioxide; PM10 = Particulate Matter 10 microns in diameter or less; PM2.5 = Particulate Matter 2.5 microns in diameter or less
1. Worst-case seasonal maximum daily emissions are reported.
2. Mobile emissions account for EMFAC adjustment factors.
Source: CalEEMod version 2022.1. Refer to Appendix A for the model outputs.
The operational emissions sources are described below:
• Mobile Source Emissions. Mobile sources are emissions from motor vehicles, including tailpipe and evaporative emissions. Depending upon the pollutant being discussed, the potential air quality impact may be of either regional or local concern. For example, ROG, NOX, PM10, and PM2.5 are all pollutants of regional concern. NOX and ROG react with sunlight to form O3, known as photochemical smog. Additionally, wind currents readily transport PM10 and PM2.5. However, CO tends to be a localized pollutant, dispersing rapidly at the source.
Project-generated vehicle emissions are based on the trip generation estimates and have been incorporated into CalEEMod, as recommended by the South Coast AQMD. The PSC would generate 4,349 total daily vehicle trips and the CYFS would generate 688 total daily vehicle trips.
5 • Area Source Emissions. Area source emissions would be generated due to architectural coatings, landscape maintenance equipment, and consumer products. Consumer products are various solvents used in non-industrial applications, which emit VOCs during product use. These typically include cleaning supplies, kitchen aerosols, cosmetics, and toiletries.
• Energy Source Emissions. Energy source air quality emissions are typically generated due to natural gas usage. Natural gas energy uses include space heating and cooling, water heating, ventilation, lighting, appliances, and electronics. Electricity usage does not emit criteria pollutant emissions. Emissions associated with the generation of electricity would occur at off-site power plants and are considered indirect emissions. Consistent with CalEEMod methodology, criteria pollutant emissions from off-site electricity generation are not attributed to individual development projects because they are produced by existing stationary sources that are regulated independently by local air quality management districts and the U.S. EPA.6 Because electricity generation occurs off-site and is subject to separate regulatory programs, the Project’s electricity consumption would not result in local air quality emissions. 5 Institute of Transportation Engineers (ITE) Trip Generation Manual, 12th Edition. 6 California Air Pollution Control Officers Association, Appendix C Emission Calculation Details for CalEEMod, page C-52, https://www.caleemod.com/documents/user-guide/04_Appendix%20C.pdf. Accessed September 2026.
Air Quality and Greenhouse Gas Analysis September 2026
City of Moreno Valley Page 8 of 15
• Emergency Generator. The City is required to obtain a permit from the South Coast AQMD prior to installation of any emergency backup generators. Emergency backup generators must meet South Coast AQMD's Best Available Control Technology (BACT) requirements and comply with South Coast AQMD Rule 1470 (Requirements for Stationary Diesel-Fueled Internal Combustion and Other Compression Ignition Engines), which would minimize emissions if and when a backup generator is in use.
The Project would include the installation of four emergency generators. Emergency backup generators would supply power to the proposed building in the event of an emergency. As such, the emergency generator would not be part of the Project’s normal daily operations. The emergency generator emissions were calculated separately from CalEEMod using CalEEMod default emission rates. It was conservatively assumed that emergency generators would operate for eight hours in a single day for testing and maintenance purposes. It is also assumed that only one generator would be tested per day.
• Fuel Station. Gas dispensing activities at the existing corporate yard would generate VOC emissions. Fuel station emissions were calculated using the U.S. EPA Potential to Emit Calculator for Gasoline Dispensing Facilities and was based on the number of fuel positions and annual fuel throughput. The CYFS would receive an average of 52,000 gallons of gasoline and 10,400 gallons of diesel fuel annually. As a worst case, annual throughput is assumed to consist of 52,000 gallons of gasoline and 10,400 gallons of diesel.
As shown in Table 2, and discussed above, operational emissions would not exceed the applicable South Coast AQMD thresholds. Impacts would be less than significant, and no new mitigation measures are required.
Localized Emissions
Localized Construction Emissions
The nearest sensitive receptors to the Project Site are single family residential uses located approximately 60 feet to the west, 70 feet to the south, and 75 feet to the north of the site. To assess the potential for Project construction to create impacts to sensitive receptors, South Coast AQMD recommends utilizing its Localized Significance Thresholds (LSTs) for construction. The LSTs were developed in response to the South Coast AQMD Governing Boards' Environmental Justice Enhancement Initiative and are based on the ambient concentrations of the pollutant at issue for each source receptor area and distance to the nearest sensitive receptor. LSTs represent the maximum emissions from a project that are not expected to cause or contribute to an exceedance of the state or federal ambient air quality standard (applying the more stringent of the two).7 South Coast AQMD provided the Final Localized Significance Threshold Methodology (dated June 2003 [revised 2008]) for guidance.8 The LST methodology assists lead agencies with conducting project-specific analysis of the potential localized impacts associated with proposed development projects.
Since CalEEMod calculates construction emissions based on the number of equipment hours and the maximum daily soil disturbance activity possible for each piece of equipment, Table 3:
7 South Coast Air Quality Management District, Localized Significance Thresholds, https://www.aqmd.gov/home/rulescompliance/ceqa/air-quality-analysis-handbook/localized-significance-thresholds. Accessed September 2026 8 South Coast Air Quality Management District, Final Localized Significance Threshold Methodology.
Air Quality and Greenhouse Gas Analysis September 2026
City of Moreno Valley Page 9 of 15
Equipment-Specific Grading Rates was used to determine the maximum daily disturbed acreage for the LST analysis.9 For this Project, the appropriate source receptor area (SRA) for the LSTs is the Perris Valley (SRA 24) area, since this area includes the Project Site. LSTs only take into consideration emissions of NOX, CO, PM10, and PM2.5.10 South Coast AQMD produced look-up tables for projects that disturb areas less than or equal to five acres in size.11 Based on the construction equipment modeled in CalEEMod, the grading phase of PSC construction and off-site improvements is anticipated to disturb approximately 6 acres in a single day and the grading phase of the CYFS is anticipated to disturb approximately one acre in a single day. Thus, the LSTs applicable to this Project uses the South Coast AQMD-produced look up tables for a 5- acre site for the receptors adjacent to the PSC and 1-acre site for receptors adjacent to the CYFS.
Table 3: Equipment-Specific Grading Rates
Construction
Phase Equipment Type Equipment Quantity
Acres Graded
per 8-Hour
Day
Operating
Hours per
Day
Acres Graded
per Day
PSC Grading +
Off-Site
Improvements
Grading
Crawler Tractor 1 0.5 8 0.5
Graders 3 0.5 8 1.5
Dozers 4 0.5 8 2
Scrapers 2 1 8 2
Total Acres Graded per Day 6
CYFS Grading
Graders 1 0.5 8 0.5
Dozers 1 0.5 8 0.5
Total Acres Graded per Day 1
Source: CalEEMod version 2022
South Coast AQMD’s methodology states that “off-site mobile emissions from the Project should not be included in the emissions compared to LSTs.”12 Therefore, for purposes of the construction LST analysis, only the emissions included in the CalEEMod “on-site” emissions outputs were considered. LST thresholds are provided for distances to sensitive receptors of 25, 50, 100, 200, and 500 meters. South Coast AQMD’s LST guidance recommends using the 25-meter threshold for receptors located 25 meters (or approximately 82 feet) or less from the Project Site.13 Therefore, the LSTs for a 6-acre site with a sensitive receptor distance of 25 meters was used for the PSC and a 1-acre site with a sensitive receptor distance of 25 meters was used for the CYFS LST construction analysis, consistent with the South Coast AQMD’s LST guidance and methodology.
Table 4: Localized Significance of Construction Emissions presents the emissions modeling results for the Project’s localized emissions during construction for the four relevant parameters.
South Coast AQMD Rule 403 reduction/credits include properly maintaining mobile and other construction equipment, replacing ground cover in disturbed areas quickly, watering exposed surfaces three times daily, and watering all haul roads twice daily. Reductions percentages from the South Coast AQMD CEQA Handbook (Tables XI-A through XI-E) were applied for the analysis of localized Project emissions during construction. As stated above, compliance with South Coast AQMD Rules 402 and 1113 and CARB anti-idling regulations were not assumed when estimating 9 South Coast Air Quality Management District, Sample Construction Scenarios for Projects Less than Five Acres in Size, February 2005, https://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significance-thresholds/final-sample-constructionscenario-report.pdf?sfvrsn=2. Accessed September 2026 10 South Coast Air Quality Management District, Final Localized Significance Threshold Methodology. 11 South Coast Air Quality Management District, Final Localized Significance Threshold Methodology, Appendix C – Mass Rate LST Look-up Tables. 12 South Coast Air Quality Management District, Final Localized Significance Threshold Methodology. 13 South Coast Air Quality Management District, Final Localized Significance Threshold Methodology.
Air Quality and Greenhouse Gas Analysis September 2026
City of Moreno Valley Page 10 of 15
the Project’s localized construction emissions for Table 4. Therefore, the Project’s maximum-day localized construction emissions analysis is conservative and actual emissions would actually be lower than reported in Table 4. Table 4 shows that the emissions of these pollutants on the peak day of construction would not exceed the LSTs and therefore would not expose the nearest sensitive receptors to substantial pollutant concentrations or cause or contribute to an exceedance of federal or state ambient air quality standards. Therefore, approval of the Project would not result in any significant effects relating to localized construction air pollutant concentrations.
Table 4: Localized Significance of Construction Emissions Source/Activity Emissions (pounds per day)1
NOX CO PM10 PM2.5
Localized PSC + Off-Site Improvements
PSC Site Preparation 2027 28.0 28.3 6.3 3.7
PSC Grading 2027 25.6 27.3 5.1 2.1
PSC Grading 2028 24.3 27.2 5.0 2.0
PSC Building Construction 2028 8.9 12.9 0.3 0.3
PSC Building Construction 2029 8.6 12.9 0.3 0.3
PSC Paving 2029 6.5 9.9 0.2 0.2
PSC Architectural Coating 2029 0.8 1.1 0.0 0.0
Maximum PSC 28.0 28.3 6.3 3.7
Off-Site Grubbing & Land Clearing 2027 3.8 4.5 0.3 0.2
Off-Site Grading & Excavation 2027 27.9 36.5 1.3 1.1
Off-Site Drainage, Utilities, and Sub Grade 2027 15.0 19.7 0.6 0.5 Off-Site Drainage, Utilities, and Sub Grade 2028 14.2 19.6 0.6 0.5 Off-Site Paving 2028 7.0 11.7 0.2 0.2
Maximum Off-Site Improvements 27.9 36.5 1.3 1.1
Maximum PSC + Off-Site Improvements Daily
Emissions2 55.9 64.7 7.6 4.8
South Coast AQMD LST (for 5 acres at 25 meters) 270 1,577 13 8 South Coast AQMD Threshold Exceeded? No No No No
Localized CYFS
CYFS Demolition 2027 3.9 5.6 0.1 0.1
CYFS Site Preparation 2027 3.4 5.6 0.3 0.2
CYFS Grading 2027 8.7 9.6 2.0 1.1
CYFS Building Construction 2027 4.6 6.9 0.2 0.2
CYFS Building Construction 2028 4.3 6.9 0.1 0.1
Maximum Daily Emissions 8.7 9.6 2.0 1.1
South Coast AQMD LST (for 1.0 acres at 25 meters) 118 602 4 3 South Coast AQMD Threshold Exceeded? No No No No
Source: CalEEMod version 2022. Refer to Appendix A for model outputs.
1. Mandatory compliance with South Coast AQMD Rule 403 Fugitive Dust applied for construction emissions.
2. Maximum localized emissions at receptors adjacent to the PSC assumes maximum emissions from the PSC construction plus maximum emissions from off-site improvements.
Localized Operational Emissions
According to South Coast AQMD’s localized significance threshold methodology, operational LSTs apply only to on-site sources.14 LSTs for receptors located at 25 meters for SRA 24 were utilized in this analysis. The one-acre LST threshold was conservatively used for the Project 14 South Coast Air Quality Management District, Final Localized Significance Threshold Methodology.
Air Quality and Greenhouse Gas Analysis September 2026
City of Moreno Valley Page 11 of 15
Site.15 The on-site operational emissions were calculated using CalEEMod and are compared to the LST thresholds in Table 5: Localized Significance of Operational Emissions.
Table 5: Localized Significance of Operational Emissions Activity Emissions (pounds per day)1,2
NOX CO PM10 PM2.5
Localized PSC
On-Site Emissions
(Area, Energy, Generator Sources) 9.29 21.84 0.54 0.54
South Coast AQMD Localized Screening
Threshold
(1.0 acre at 25 meters)
118 602 1 1
South Coast AQMD Threshold
Exceeded? No No No No
Localized CYFS Fueling Station
On-Site Emissions
(Area and Energy Sources) 0 0 0 0
South Coast AQMD Localized Screening
Threshold
(1.0 acre at 25 meters)
118 602 1 1
South Coast AQMD Threshold
Exceeded? No No No No
Source: CalEEMod version 2022. Refer to Appendix A for model outputs.
1. As recommended by the South Coast AQMD, worst-case seasonal maximum daily emissions are reported.
2. On-site emissions consist of area sources and energy sources.
The operational emissions shown in Table 5 include all on-site Project-related sources (i.e., area and energy). Off-site mobile emissions should not be included.16 The results of the LST analysis show that the Project would not cause or contribute to an exceedance of federal or State ambient air quality standards. Therefore, approval of the Project would not expose the nearest sensitive receptors to substantial pollutant concentrations and would not result in any significant effects relating to operational air pollutant concentrations.
Greenhouse Gas Emissions Impact Analysis
Construction GHG Emissions
Construction of the Project would result in direct emissions from construction equipment and the transport of materials and construction workers to and from the Project Site. Construction GHG emissions are typically summed and amortized over the lifetime of the Project (assumed to be 30 years), then added to the operational emissions.17 Total GHG emissions generated during all phases of construction were combined and are presented in Table 6: Construction Greenhouse Gas Emissions. As shown in the table, the Project construction would result in approximately 1,505 metric tons of carbon dioxide equivalent (MTCO2e)18 (approximately 50 MTCO2e/year when amortized over 30 years). Once construction is complete, the generation of these GHG emissions would cease.
15 Construction LST analysis is based on the amount of daily ground disturbance, which was calculated to be 1.5 acre. For operations, the size of the Project Site has been used. 16 South Coast Air Quality Management District, Final Localized Significance Threshold Methodology. 17 The project lifetime is based on the standard 30-year assumption of the South Coast Air Quality Management District (South Coast Air Quality Management District, Minutes for the GHG CEQA Significance Threshold Stakeholder Working Group #13, August 26, 2009). 18 Carbon dioxide equivalent (CO2e) is a metric measure used to compare the emissions from various GHGs on the basis of their global-warming potential (GWP), by converting amounts of other gases to the equivalent amount of CO2 with the same GWP.
Air Quality and Greenhouse Gas Analysis September 2026
City of Moreno Valley Page 12 of 15
Table 6: Construction Greenhouse Gas Emissions
Construction MTCO2e per Year
2027 PSC 181
2027 CYFS 37
2027 Off-Site Improvements 176
2028 PSC 689
2028 CYFS 29
2028 Off-Site Improvements 33
2029 PSC 360
Total Construction 1,505
Amortized over 30 Years 50
Source: CalEEMod version 2022.1. Refer to Appendix A for model data outputs.
Operational GHG Emissions
Operational or long-term emissions occur over the life of the Project. For this Project, GHG emissions would result from direct emissions such as Project-generated vehicular traffic and operation of any on-site landscaping equipment. Operational GHG emissions would also result from indirect sources, such as the emissions associated with solid waste generated from the Project Site as well as electricity consumption. Table 7: Total Project Greenhouse Gas Emissions summarizes the total GHG emissions associated with the Project. As shown, the Project would generate approximately 10,201 MTCO2e/year.
Table 7: Total Project Greenhouse Gas Emissions
Emissions Source MTCO2e per Year
Construction Amortized over 30 Years 50
PSC Mobile1 6,276
PSC Area 6
PSC Energy 1,236
PSC Water 132
PSC Waste 418
PSC Emergency Backup Generators 17
CYFS Mobile1 2,066
Total Project Emissions 10,201
Notes:
1. Mobile emissions account for EMFAC adjustment factors.
Source: CalEEMod version 2022.1. Refer to Appendix A for model data outputs.
Greenhouse Gas Reduction Plan Compliance
The FEIR determined that the General Plan Update (GPU) and Climate Action Plan (CAP) would not conflict with applicable GHG reduction planning with implementation of mitigation. FEIR MM GHG-1 requires that the City periodically update the CAP, adding or enhancing Actions and Measures to achieve City-specific reductions targets in line with SB 32 and AB 1279.
The CAP includes specific implementation and monitoring procedures that require the City to achieve increasingly effective long-term reductions over time and demonstrate substantial progress toward GHG reduction goals. As discussed in the FEIR, City would update the CAP following updates to the Scoping Plan or new interim post-2040 targets which would demonstrate how achievement of the State’s longer-term 2045 goal would be feasible. As a result, projects consistent with the CAP are also consistent with CARB’s Scoping Plan and other applicable GHG reduction plans.
The Project is permitted under the existing land use and zoning designation and would be designed in accordance with the 2025 CALGreen Code. The Project would include electric-ready appliances in accordance with the California Energy Code and incorporate solar photovoltaic panels throughout the covered parking areas in accordance with Title 24, Part 6. As shown in the Air Quality and Greenhouse Gas Analysis September 2026
City of Moreno Valley Page 13 of 15
completed CAP checklist (see Appendix B), the Project would be consistent with the CAP.
Therefore, the Proposed Project would not conflict with applicable GHG reduction planning and impacts would be less than significant with implementation of mitigation, consistent with the findings of the FEIR.
Appendix A
AQ and GHG Modeling Data
Moreno Valley –Public Safety Campus
CalEEMod Assumptions
Land Use
Land Use Size Metric
Civic Center 235 KSF
Unenclosed Parking Structure 77.432 KSF
Other Asphalt Surfaces 41.571 AC
KSF = thousand square feet; AC = acre
Construction
Schedule
Phase Name Start Date End Date Workdays
Site Preparation 10/1/2027 11/25/2027 40
Grading 11/26/2027 4/27/2028 110
Building Construction 4/28/2028 6/21/2029 300
Paving 6/22/2029 10/4/2029 75
Architectural Coating 10/5/2029 12/20/2029 55
Equipment
Construction Phase Equipment Number per Day Hours Per Day Site Preparation Rubber Tired Dozers 3 8
Site Preparation Tractors/Loaders/Backhoes 4 8
Grading Excavators 2 8
Grading Graders 1 8
Grading Rubber Tired Dozers 1 8
Grading Scrapers 2 8
Grading Tractors/Loaders/Backhoes 2 8
Building Construction Cranes 1 7
Building Construction Forklifts 3 8
Building Construction Generator Sets 1 8
Building Construction Tractors/Loaders/Backhoes 3 7
Building Construction Welders 1 8
Paving Pavers 2 8
Paving Paving Equipment 2 8
Paving Rollers 2 8
Architectural Coating Air Compressors 1 6
Grading/Earthwork
Phase Import (CY) Export (CY) Haul Distance (mi)
Site Preparation 0 0 N/A
Grading 0 0 N/A
CY = cubic yards; mi = miles; N/A = Not Applicable
Moreno Valley – Public Safety Campus CalEEMod Assumptions 2 Worker, Vendor, and Haul Trips
Phase Trip Type # One-Way Trips/Day Trip Length (miles) Site Preparation Worker 17.5 18.5
Site Preparation Vendor 0 10.2
Site Preparation Hauling 0 20
Site Preparation Onsite truck 0 0
Grading Worker 20 18.5
Grading Vendor 0 10.2
Grading Hauling 0 20
Grading Onsite truck 0 0
Building Construction Worker 107.72144 18.5
Building Construction Vendor 51.2076048 10.2
Building Construction Hauling 0 20
Building Construction Onsite truck 0 0
Paving Worker 15 18.5
Paving Vendor 0 10.2
Paving Hauling 0 20
Paving Onsite truck 0 0
Architectural Coating Worker 21.544288 18.5
Architectural Coating Vendor 0 10.2
Architectural Coating Hauling 0 20
Architectural Coating Onsite truck 0 0
Demolition
Phase Amount (CY)
Demolition None
CY = cubic yards
Operations
Vehicle Data
Land Use Size Metric Trip Rate Daily Trip
Generation
Civic Center 235 KSF 18.51 4,349
Total Daily Trips - - - 4,349
KSF = thousand square feet; DU
100% primary trips; trip lengths and trip type distributions are CalEEMod defaults Trip Length
Land Use
Trip Length (miles)
Non-Res H-W
/ Res H-W
Non-Res W-O
/ Res H-S
Non-Res O-O
/ Res H-O
Civic Center 126.01193096 14.3545716 6.138959314 1
Moreno Valley – Public Safety Campus CalEEMod Assumptions 3 Trip Purpose and Percent
Land Use
Trip Percent (%) Trip Purpose (%)
Primary Diverted Pass-By
Non-Res HW
/ Res H-W
Non-Res WO
/ Res H-S
Non-Res O-O
/ Res H-O
Civic Center 100 0 0 27.1458774 2.9175476 69.9365751
Fleet Mix
Land Use HHD
%
LDA
%
LDT1
%
LDT2
%
LHD1
%
LHD2
%
MCY
%
MDV
%
MH
%
MHD
%
OBUS
%
SBUS
%
UBUS
%
Civic Center 1.702
93785
63165
665
49.31 77950
38223
27 3.455
05326
98631
287
21.85 45064
33010
1 2.953
18495
48220
634
0.846
49203
34517
956
2.193
28701
49612
427
15.42 00434
68475
342
0.482
13307
74575
472
1.549
52062
29388
714
0.056
72789
99369
5915
0.131
00310
46159
5654
0.037
31460
01948
0437
Stationary Sources
Equipment Type Fuel Type # per Day Hours/
Day
Hours/
Year HP Load Factor
Emergency Generators Diesel 1 8 50 200 0.74
HP = horsepower
Moreno Valley – Corporate Yard Fueling Station
CalEEMod Assumptions
Land Use
Land Use Size Metric
Fueling Station 0.324 KSF
KSF = thousand square feet
Construction
Schedule
Phase Name Start Date End Date Workdays
Demolition 10/1/2027 10/15/2027 10
Site Preparation 10/16/2027 10/17/2027 1
Grading 10/18/2027 10/20/2027 2
Building Construction 10/21/2027 3/9/2028 100
Equipment
Construction Phase Equipment Number per Day Hours Per Day Site Preparation Tractors/Loaders/Backhoes 1 8
Site Preparation Graders 1 8
Grading Graders 1 6
Grading Rubber Tired Dozers 1 6
Grading Tractors/Loaders/Backhoes 1 7
Building Construction Cranes 1 4
Building Construction Forklifts 2 6
Building Construction Tractors/Loaders/Backhoes 2 8
Demolition Tractors/Loaders/Backhoes 2 6
Demolition Rubber Tired Dozers 1 1
Demolition Concrete/Industrial Saws 1 8
Grading/Earthwork
Phase Import (CY) Export (CY) Haul Distance (mi)
Site Preparation 0 0 N/A
Grading 0 0 N/A
CY = cubic yards; mi = miles; N/A = Not Applicable
Moreno Valley – Corporate Yard Fueling Station CalEEMod Assumptions 2 Worker, Vendor, and Haul Trips
Phase Trip Type # One-Way Trips/Day Trip Length (miles) Site Preparation Worker 5 18.5
Site Preparation Vendor 0 10.2
Site Preparation Hauling 0 20
Site Preparation Onsite truck 0 0
Grading Worker 7.5 18.5
Grading Vendor 0 10.2
Grading Hauling 0 20
Grading Onsite truck 0 0
Building Construction Worker
0.1040000000000000
1 18.5
Building Construction Vendor
0.0532674999999999
95 10.2
Building Construction Hauling 0 20
Building Construction Onsite truck 0 0
Demolition Worker 10 18.5
Demolition Vendor 0 10.2
Demolition Hauling 0.2 20
Demolition Onsite truck 0 0
Demolition
Phase Amount (tons)
Demolition 5
Operations
Vehicle Data
Land Use Size Metric Trip Rate Daily Trip
Generation
Fueling Station 0.324 KSF 172 688
Total Daily Trips - - - 688
KSF = thousand square feet; DU
100% primary trips; trip lengths and trip type distributions are CalEEMod defaults Trip Length
Land Use
Trip Length (miles)
Non-Res H-W
/ Res H-W
Non-Res W-O
/ Res H-S
Non-Res O-O
/ Res H-O
Fueling Station 26.01193096 14.3545716 6.138959314
Moreno Valley – Corporate Yard Fueling Station CalEEMod Assumptions 3 Trip Purpose and Percent
Land Use
Trip Percent (%) Trip Purpose (%)
Primary Diverted Pass-By
Non-Res HW
/ Res H-W
Non-Res WO
/ Res H-S
Non-Res O-O
/ Res H-O
Fueling Station 100 0 0 27.1458774 2.9175476 69.9365751 Fleet Mix
Land Use HHD
%
LDA
%
LDT1
%
LDT2
%
LHD1
%
LHD2
%
MCY
%
MDV
%
MH
%
MHD
%
OBUS
%
SBUS
%
UBUS
%
Fueling
Station
1.664
98813
77816
2 49.49
62126
01661
68 3.610
35689
71157
074
21.19 94230
74722
29 3.038
74891
25132
56 0.869
94227
02193
26 2.250
90198
21882
25 15.59
28254
12750
244
0.538
38100
28433
8 1.509
15971
02582
455
0.058
32720
19866
85395
0.132
75559
75876
7486
0.037
97679
96491
8643
Moreno Valley –Off-Site Improvements
CalEEMod Assumptions
Land Use
Land Use Size Metric
Linear – Road Widening 0.45
3.79 Mile
Acres
Construction
Schedule
Phase Name Start Date End Date Workdays
Linear, Grubbing & Land Clearing 10/1/2027 10/14/2027 10 Linear, Grading & Excavation 10/15/2027 12/2/2027 35
Linear, Drainage, Utilities, & Sub-Grade 12/3/2027 1/13/2028 30 Linear, Paving 1/14/2028 2/3/2028 15
Equipment
Construction Phase Equipment
Number per
Day Hours Per Day
Linear, Grubbing & Land Clearing Signal Boards 0 8
Linear, Grubbing & Land Clearing Crawler Tractors 1 8
Linear, Grubbing & Land Clearing Excavators 2 8
Linear, Grading & Excavation Excavators 3 8
Linear, Grading & Excavation Crawler Tractors 1 8
Linear, Grading & Excavation Graders 2 8
Linear, Grading & Excavation Rollers 2 8
Linear, Grading & Excavation Signal Boards 0 8
Linear, Grading & Excavation Tractors/Loaders/Backhoes 4 8 Linear, Grading & Excavation Rubber Tired Loaders 1 8
Linear, Grading & Excavation Scrapers 2 8
Linear, Drainage, Utilities, & Sub-Grade Scrapers 1 8
Linear, Drainage, Utilities, & Sub-Grade Rough Terrain Forklifts 1 8 Linear, Drainage, Utilities, & Sub-Grade Tractors/Loaders/Backhoes 3 8 Linear, Drainage, Utilities, & Sub-Grade Signal Boards 0 8 Linear, Drainage, Utilities, & Sub-Grade Graders 1 8
Linear, Drainage, Utilities, & Sub-Grade Plate Compactors 1 8 Linear, Drainage, Utilities, & Sub-Grade Pumps 1 8
Linear, Drainage, Utilities, & Sub-Grade Air Compressors 1 8 Linear, Drainage, Utilities, & Sub-Grade Generator Sets 1 8 Linear, Paving Rollers 2 8
Linear, Paving Paving Equipment 1 8
Linear, Paving Pavers 1 8
Linear, Paving Tractors/Loaders/Backhoes 3 8
Linear, Paving Signal Boards 0 8
Moreno Valley – Off-Site Improvements CalEEMod Assumptions 2 Grading/Earthwork
Phase Import (CY) Export (CY) Haul Distance (mi)
Site Preparation 0 0 N/A
Grading 0 0 N/A
CY = cubic yards; mi = miles; N/A = Not Applicable
Worker, Vendor, and Haul Trips
Phase Trip Type
# One-Way
Trips/Day Trip Length (miles)
Linear, Grubbing & Land Clearing Worker 7.5 18.5
Linear, Grubbing & Land Clearing Vendor 2 10.2
Linear, Grubbing & Land Clearing Hauling 0 20
Linear, Grubbing & Land Clearing Onsite truck 0 0
Linear, Grading & Excavation Worker 37.5 18.5
Linear, Grading & Excavation Vendor 2 10.2
Linear, Grading & Excavation Hauling 0 20
Linear, Grading & Excavation Onsite truck 0 0
Linear, Drainage, Utilities, & Sub-Grade Worker 25 18.5 Linear, Drainage, Utilities, & Sub-Grade Vendor 2 10.2
Linear, Drainage, Utilities, & Sub-Grade Hauling 0 20
Linear, Drainage, Utilities, & Sub-Grade Onsite truck 0 0 Linear, Paving Worker 17.5 18.5
Linear, Paving Vendor 2 10.2
Linear, Paving Hauling 0 20
Linear, Paving Onsite truck 0 0
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Moreno Valley Public Safety Campus Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated
2.2.2. Onsite Construction Emissions by Year, Unmitigated
2.2.3. Offsite Construction Emissions by Year, Unmitigated
2.3. Operations Emissions Compared Against Thresholds
2.4. Operations Emissions by Sector, Unmitigated
3. Construction Emissions Details
3.1. Site Preparation (2027)
3.1.1. Onsite - Unmitigated
3.1.2. Offsite - Unmitigated
3.2. Grading (2027)
3.2.1. Onsite - Unmitigated
1 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
3.2.2. Offsite - Unmitigated
3.3. Grading (2028)
3.3.1. Onsite - Unmitigated
3.3.2. Offsite - Unmitigated
3.4. Building Construction (2028)
3.4.1. Onsite - Unmitigated
3.4.2. Offsite - Unmitigated
3.5. Building Construction (2029)
3.5.1. Onsite - Unmitigated
3.5.2. Offsite - Unmitigated
3.6. Paving (2029)
3.6.1. Onsite - Unmitigated
3.6.2. Offsite - Unmitigated
3.7. Architectural Coating (2029)
3.7.1. Onsite - Unmitigated
3.7.2. Offsite - Unmitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
2 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
4.3. Area Emissions by Source
4.3.1. Unmitigated
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
3 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.9. Operational Mobile Sources
5.9.1. Unmitigated
5.10. Operational Area Sources
5.10.1. Hearths
5.10.2. Architectural Coatings
5.10.3. Landscape Equipment
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
4 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
5 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications
8.3. Land Use
8.4. Construction
8.4.1. Construction Phases
8.5. Operations
8.5.1. Mobile Sources
8.5.1.1. Vehicle Data
6 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name Moreno Valley Public Safety Campus
Construction Start Date 10/1/2027
Operational Year 2030
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.50000
Precipitation (days) 24.0000
Location Wilmot St & Brodiaea Ave, Moreno Valley, CA 92555, USA County Riverside-South Coast
City Moreno Valley
Air District South Coast AQMD
Air Basin South Coast
TAZ 5583
EDFZ 11
Electric Utility Moreno Valley Utility
Gas Utility Southern California Gas
7 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Data Field Value
App Version 2022.1.1.45
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Government (Civic
Center)
235.000 1000sqft 7.54000 235,000 175,000 — — —
Unenclosed
Parking with
Elevator
77.4320 1000sqft 0.88880 77,432.0 0.00000 — — —
Other Asphalt
Surfaces
41.5700 Acre 41.5700 0.00000 0.00000 — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 3.51217 2.95563 24.3980 28.4070 0.06093 0.98510 4.30873 5.29383 0.90629 1.18989 2.09618 — 6,863.92 6,863.92 0.27074 0.29720 7.56600 6,890.22 8 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 49.3380 49.3063 28.0411 29.1580 0.06093 1.17173 5.33956 6.51130 1.07799 2.68025 3.75825 — 6,847.06 6,847.06 0.27118 0.29720 0.19628 6,872.63 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 8.45512 8.32975 10.9408 15.5964 0.03102 0.38437 1.87673 2.26110 0.35451 0.49013 0.84465 — 4,109.22 4,109.22 0.13066 0.15879 1.65949 4,161.47 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 1.54306 1.52018 1.99669 2.84635 0.00566 0.07015 0.34250 0.41265 0.06470 0.08945 0.15415 — 680.328 680.328 0.02163 0.02629 0.27475 688.978
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated Includes both onsite and offsite emissions.
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2028 3.51217 2.95563 24.3980 28.4070 0.06093 0.98510 4.30873 5.29383 0.90629 1.18989 2.09618 — 6,863.92 6,863.92 0.27074 0.29720 7.56600 6,890.22 2029 2.34025 2.21140 10.3564 19.6042 0.03491 0.29867 1.84615 2.14482 0.27662 0.45108 0.72771 — 5,242.69 5,242.69 0.13541 0.28568 6.75376 5,337.96 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
9 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 2027 3.70681 3.11806 28.0411 29.1580 0.06093 1.17173 5.33956 6.51130 1.07799 2.68025 3.75825 — 6,847.06 6,847.06 0.27117 0.06301 0.02181 6,872.63 2028 3.50004 2.95122 24.4070 28.1054 0.06093 0.98510 4.30873 5.29383 0.90629 1.18989 2.09618 — 6,842.63 6,842.63 0.27118 0.29720 0.19628 6,868.21 2029 49.3380 49.3063 10.4656 18.0682 0.03491 0.29867 1.84615 2.14482 0.27662 0.45108 0.72771 — 5,131.50 5,131.50 0.13778 0.28568 0.17559 5,220.26 Average
Daily
— — — — — — — — — — — — — — — — — —
2027 0.65922 0.55456 4.88200 5.19643 0.00965 0.20189 0.88804 1.08993 0.18574 0.37739 0.56313 — 1,087.36 1,087.36 0.04299 0.01006 0.06034 1,091.49 2028 1.61058 1.36763 10.9408 15.5964 0.03102 0.38437 1.87673 2.26110 0.35451 0.49013 0.84465 — 4,109.22 4,109.22 0.13066 0.15879 1.65949 4,161.47 2029 8.45512 8.32975 4.99402 8.66749 0.01488 0.15158 0.69363 0.84522 0.14008 0.16860 0.30868 — 2,139.93 2,139.93 0.06076 0.10184 1.07407 2,172.87 Annual — — — — — — — — — — — — — — — — — —
2027 0.12031 0.10121 0.89097 0.94835 0.00176 0.03685 0.16207 0.19891 0.03390 0.06887 0.10277 — 180.024 180.024 0.00712 0.00167 0.00999 180.709 2028 0.29393 0.24959 1.99669 2.84635 0.00566 0.07015 0.34250 0.41265 0.06470 0.08945 0.15415 — 680.328 680.328 0.02163 0.02629 0.27475 688.978 2029 1.54306 1.52018 0.91141 1.58182 0.00272 0.02766 0.12659 0.15425 0.02556 0.03077 0.05633 — 354.289 354.289 0.01006 0.01686 0.17782 359.743
2.2.2. Onsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2028 3.42509 2.87803 24.3289 27.1688 0.06093 0.98510 4.04731 5.03241 0.90629 1.12861 2.03490 — 6,598.26 6,598.26 0.26765 0.05353 0.00000 6,620.90 2029 2.28370 2.15584 8.58166 12.9012 0.02340 0.27564 0.00000 0.27564 0.25359 0.00000 0.25359 — 2,396.83 2,396.83 0.09723 0.01945 0.00000 2,405.06 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
10 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 2027 3.63178 3.05170 27.9724 28.2794 0.06093 1.17173 5.11082 6.28256 1.07799 2.62664 3.70463 — 6,598.08 6,598.08 0.26765 0.05353 0.00000 6,620.72 2028 3.42509 2.87803 24.3289 27.1688 0.06093 0.98510 4.04731 5.03241 0.90629 1.12861 2.03490 — 6,598.26 6,598.26 0.26765 0.05353 0.00000 6,620.90 2029 49.2611 49.2396 8.58166 12.9012 0.02340 0.27564 0.00000 0.27564 0.25359 0.00000 0.25359 — 2,396.83 2,396.83 0.09723 0.01945 0.00000 2,405.06 Average
Daily
— — — — — — — — — — — — — — — — — —
2027 0.64495 0.54194 4.86759 5.02110 0.00965 0.20189 0.84522 1.04712 0.18574 0.36736 0.55310 — 1,045.42 1,045.42 0.04241 0.00848 0.00000 1,049.01 2028 1.36594 1.14576 9.94952 12.5516 0.02543 0.37319 0.93460 1.30780 0.34334 0.26062 0.60395 — 2,687.21 2,687.21 0.10900 0.02180 0.00000 2,696.43 2029 8.28037 8.18750 4.33523 6.54810 0.01100 0.14383 0.00000 0.14383 0.13233 0.00000 0.13233 — 1,137.28 1,137.28 0.04613 0.00923 0.00000 1,141.18 Annual — — — — — — — — — — — — — — — — — —
2027 0.11770 0.09890 0.88834 0.91635 0.00176 0.03685 0.15425 0.19110 0.03390 0.06704 0.10094 — 173.081 173.081 0.00702 0.00140 0.00000 173.675 2028 0.24928 0.20910 1.81579 2.29067 0.00464 0.06811 0.17057 0.23867 0.06266 0.04756 0.11022 — 444.898 444.898 0.01805 0.00361 0.00000 446.425 2029 1.51117 1.49422 0.79118 1.19503 0.00201 0.02625 0.00000 0.02625 0.02415 0.00000 0.02415 — 188.290 188.290 0.00764 0.00153 0.00000 188.936
2.2.3. Offsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2028 0.53745 0.44981 1.87744 7.15380 0.01152 0.02303 1.84615 1.86918 0.02303 0.45108 0.47412 — 2,909.86 2,909.86 0.04056 0.27775 7.56600 3,001.21 2029 0.47451 0.43081 1.77479 6.70299 0.01152 0.02303 1.84615 1.86918 0.02303 0.45108 0.47412 — 2,845.85 2,845.85 0.03818 0.26623 6.75376 2,932.90 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
11 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 2027 0.08576 0.07584 0.07848 1.00421 0.00000 0.00000 0.26142 0.26142 0.00000 0.06128 0.06128 — 248.978 248.978 0.00353 0.00948 0.02181 251.913 2028 0.46988 0.42380 1.99702 5.54182 0.01152 0.02303 1.84615 1.86918 0.02303 0.45108 0.47412 — 2,796.35 2,796.35 0.04293 0.27775 0.19628 2,880.39 2029 0.45088 0.36324 1.88398 5.16701 0.01152 0.02303 1.84615 1.86918 0.02303 0.45108 0.47412 — 2,734.67 2,734.67 0.04056 0.26623 0.17559 2,815.20 Average
Daily
— — — — — — — — — — — — — — — — — —
2027 0.01427 0.01262 0.01441 0.17533 0.00000 0.00000 0.04281 0.04281 0.00000 0.01003 0.01003 — 41.9392 41.9392 0.00059 0.00158 0.06034 42.4841 2028 0.24465 0.22188 0.99128 3.04484 0.00559 0.01118 0.94212 0.95330 0.01118 0.22952 0.24069 — 1,422.01 1,422.01 0.02165 0.13699 1.65949 1,465.03 2029 0.17475 0.14225 0.65879 2.11939 0.00388 0.00775 0.69363 0.70138 0.00775 0.16860 0.17635 — 1,002.64 1,002.64 0.01463 0.09261 1.07407 1,031.68 Annual — — — — — — — — — — — — — — — — — —
2027 0.00260 0.00230 0.00263 0.03200 0.00000 0.00000 0.00781 0.00781 0.00000 0.00183 0.00183 — 6.94351 6.94351 0.00010 0.00026 0.00999 7.03373 2028 0.04465 0.04049 0.18091 0.55568 0.00102 0.00204 0.17194 0.17398 0.00204 0.04189 0.04393 — 235.430 235.430 0.00358 0.02268 0.27475 242.553 2029 0.03189 0.02596 0.12023 0.38679 0.00071 0.00141 0.12659 0.12800 0.00141 0.03077 0.03218 — 165.999 165.999 0.00242 0.01533 0.17782 170.807
2.3. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 24.7241 23.0082 15.4952 152.517 0.39550 0.40288 36.2430 36.6459 0.38206 9.19604 9.57810 811.368 47,202.7 48,014.1 83.3109 1.92036 92.4025 50,761.6 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 21.4925 19.9591 16.3577 116.432 0.37105 0.37887 36.2430 36.6219 0.36393 9.19604 9.55997 811.368 44,755.7 45,567.1 83.3539 1.97098 2.95265 48,241.2 12 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 23.0195 21.3546 16.6900 129.868 0.37502 0.39533 35.6853 36.0806 0.37636 9.05662 9.43298 811.368 45,139.3 45,950.7 83.3584 1.98609 40.2234 48,666.7 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 4.20107 3.89721 3.04593 23.7009 0.06844 0.07215 6.51257 6.58472 0.06869 1.65283 1.72152 134.331 7,473.33 7,607.66 13.8009 0.32882 6.65944 8,057.33
2.4. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 16.1983 14.7647 13.6396 137.466 0.38424 0.24641 36.2430 36.4894 0.23147 9.19604 9.42751 — 39,295.6 39,295.6 1.37908 1.64706 91.8310 39,912.7 Area 8.33422 8.14772 0.11434 13.5885 0.00081 0.02414 — 0.02414 0.01825 — 0.01825 — 55.8774 55.8774 0.00234 0.00048 — 56.0789 Energy 0.19154 0.09577 1.74130 1.46269 0.01045 0.13234 — 0.13234 0.13234 — 0.13234 — 7,438.38 7,438.38 0.57421 0.05123 — 7,468.00 Water — — — — — — — — — — — 89.4595 412.886 502.345 9.20311 0.22159 — 798.458 Waste — — — — — — — — — — — 721.909 0.00000 721.909 72.1522 0.00000 — 2,525.71 Refrig. — — — — — — — — — — — — — — — — 0.57152 0.57152 Total 24.7241 23.0082 15.4952 152.517 0.39550 0.40288 36.2430 36.6459 0.38206 9.19604 9.57810 811.368 47,202.7 48,014.1 83.3109 1.92036 92.4025 50,761.6 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 15.3860 13.9485 14.6164 114.970 0.36060 0.24653 36.2430 36.4895 0.23159 9.19604 9.42763 — 36,904.4 36,904.4 1.42439 1.69816 2.38113 37,448.5 13 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Area 5.91488 5.91488 — — — — — — — — — — — — — — — —
Energy 0.19154 0.09577 1.74130 1.46269 0.01045 0.13234 — 0.13234 0.13234 — 0.13234 — 7,438.38 7,438.38 0.57421 0.05123 — 7,468.00 Water — — — — — — — — — — — 89.4595 412.886 502.345 9.20311 0.22159 — 798.458 Waste — — — — — — — — — — — 721.909 0.00000 721.909 72.1522 0.00000 — 2,525.71 Refrig. — — — — — — — — — — — — — — — — 0.57152 0.57152 Total 21.4925 19.9591 16.3577 116.432 0.37105 0.37887 36.2430 36.6219 0.36393 9.19604 9.55997 811.368 44,755.7 45,567.1 83.3539 1.97098 2.95265 48,241.2 Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 15.2560 13.8146 14.8704 119.098 0.36402 0.24646 35.6853 35.9318 0.23152 9.05662 9.28815 — 37,249.8 37,249.8 1.42735 1.71294 39.6519 37,835.6 Area 7.57196 7.44422 0.07831 9.30716 0.00056 0.01653 — 0.01653 0.01250 — 0.01250 — 38.2722 38.2722 0.00161 0.00033 — 38.4102 Energy 0.19154 0.09577 1.74130 1.46269 0.01045 0.13234 — 0.13234 0.13234 — 0.13234 — 7,438.38 7,438.38 0.57421 0.05123 — 7,468.00 Water — — — — — — — — — — — 89.4595 412.886 502.345 9.20311 0.22159 — 798.458 Waste — — — — — — — — — — — 721.909 0.00000 721.909 72.1522 0.00000 — 2,525.71 Refrig. — — — — — — — — — — — — — — — — 0.57152 0.57152 Total 23.0195 21.3546 16.6900 129.868 0.37502 0.39533 35.6853 36.0806 0.37636 9.05662 9.43298 811.368 45,139.3 45,950.7 83.3584 1.98609 40.2234 48,666.7 Annual — — — — — — — — — — — — — — — — — —
Mobile 2.78423 2.52116 2.71385 21.7354 0.06643 0.04498 6.51257 6.55755 0.04225 1.65283 1.69509 — 6,167.13 6,167.13 0.23631 0.28360 6.56482 6,264.11 Area 1.38188 1.35857 0.01429 1.69856 0.00010 0.00302 — 0.00302 0.00228 — 0.00228 — 6.33640 6.33640 0.00027 0.00005 — 6.35925 Energy 0.03496 0.01748 0.31779 0.26694 0.00191 0.02415 — 0.02415 0.02415 — 0.02415 — 1,231.51 1,231.51 0.09507 0.00848 — 1,236.41 Water — — — — — — — — — — — 14.8110 68.3580 83.1690 1.52368 0.03669 — 132.194 Waste — — — — — — — — — — — 119.520 0.00000 119.520 11.9456 0.00000 — 418.161 Refrig. — — — — — — — — — — — — — — — — 0.09462 0.09462 14 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Total 4.20107 3.89721 3.04593 23.7009 0.06844 0.07215 6.51257 6.58472 0.06869 1.65283 1.72152 134.331 7,473.33 7,607.66 13.8009 0.32882 6.65944 8,057.33
3. Construction Emissions Details
3.1. Site Preparation (2027)
3.1.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
3.63178 3.05170 27.9724 28.2794 0.04891 1.17173 — 1.17173 1.07799 — 1.07799 — 5,297.82 5,297.82 0.21490 0.04298 — 5,316.00 Dust
From
Material
Moveme
nt
— — — — — — 5.11082 5.11082 — 2.62664 2.62664 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
15 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e OffRoad Eq
uipment
0.39800 0.33443 3.06547 3.09911 0.00536 0.12841 — 0.12841 0.11814 — 0.11814 — 580.583 580.583 0.02355 0.00471 — 582.575 Dust
From
Material
Moveme
nt
— — — — — — 0.56009 0.56009 — 0.28785 0.28785 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.07264 0.06103 0.55945 0.56559 0.00098 0.02343 — 0.02343 0.02156 — 0.02156 — 96.1221 96.1221 0.00390 0.00078 — 96.4520 Dust
From
Material
Moveme
nt
— — — — — — 0.10222 0.10222 — 0.05253 0.05253 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
16 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.07504 0.06636 0.06867 0.87868 0.00000 0.00000 0.22874 0.22874 0.00000 0.05362 0.05362 — 217.856 217.856 0.00309 0.00829 0.01909 220.424 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00822 0.00727 0.00831 0.10107 0.00000 0.00000 0.02468 0.02468 0.00000 0.00578 0.00578 — 24.1767 24.1767 0.00034 0.00091 0.03479 24.4908 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00150 0.00133 0.00152 0.01845 0.00000 0.00000 0.00450 0.00450 0.00000 0.00105 0.00105 — 4.00273 4.00273 0.00006 0.00015 0.00576 4.05474 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2. Grading (2027)
3.2.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
17 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e OffRoad Eq
uipment
3.50534 2.94546 25.5801 27.2816 0.06093 1.04307 — 1.04307 0.95962 — 0.95962 — 6,598.08 6,598.08 0.26765 0.05353 — 6,620.72 Dust
From
Material
Moveme
nt
— — — — — — 4.04731 4.04731 — 1.12861 1.12861 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.24695 0.20751 1.80212 1.92199 0.00429 0.07348 — 0.07348 0.06761 — 0.06761 — 464.835 464.835 0.01886 0.00377 — 466.430 Dust
From
Material
Moveme
nt
— — — — — — 0.28513 0.28513 — 0.07951 0.07951 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.04507 0.03787 0.32889 0.35076 0.00078 0.01341 — 0.01341 0.01234 — 0.01234 — 76.9588 76.9588 0.00312 0.00062 — 77.2229 Dust
From
Material
Moveme
nt
— — — — — — 0.05204 0.05204 — 0.01451 0.01451 — — — — — — — 18 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.08576 0.07584 0.07848 1.00421 0.00000 0.00000 0.26142 0.26142 0.00000 0.06128 0.06128 — 248.978 248.978 0.00353 0.00948 0.02181 251.913 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00604 0.00534 0.00610 0.07426 0.00000 0.00000 0.01813 0.01813 0.00000 0.00425 0.00425 — 17.7625 17.7625 0.00025 0.00067 0.02556 17.9933 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00110 0.00098 0.00111 0.01355 0.00000 0.00000 0.00331 0.00331 0.00000 0.00077 0.00077 — 2.94078 2.94078 0.00004 0.00011 0.00423 2.97899 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 19 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
3.3. Grading (2028)
3.3.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
3.42509 2.87803 24.3289 27.1688 0.06093 0.98510 — 0.98510 0.90629 — 0.90629 — 6,598.26 6,598.26 0.26765 0.05353 — 6,620.90 Dust
From
Material
Moveme
nt
— — — — — — 4.04731 4.04731 — 1.12861 1.12861 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
3.42509 2.87803 24.3289 27.1688 0.06093 0.98510 — 0.98510 0.90629 — 0.90629 — 6,598.26 6,598.26 0.26765 0.05353 — 6,620.90 Dust
From
Material
Moveme
nt
— — — — — — 4.04731 4.04731 — 1.12861 1.12861 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 20 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.79092 0.66459 5.61804 6.27382 0.01407 0.22748 — 0.22748 0.20928 — 0.20928 — 1,523.67 1,523.67 0.06181 0.01236 — 1,528.90 Dust
From
Material
Moveme
nt
— — — — — — 0.93460 0.93460 — 0.26062 0.26062 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.14434 0.12129 1.02529 1.14497 0.00257 0.04151 — 0.04151 0.03819 — 0.03819 — 252.261 252.261 0.01023 0.00205 — 253.126 Dust
From
Material
Moveme
nt
— — — — — — 0.17057 0.17057 — 0.04756 0.04756 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
21 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.08708 0.07760 0.06900 1.23812 0.00000 0.00000 0.26142 0.26142 0.00000 0.06128 0.06128 — 265.660 265.660 0.00309 0.00948 0.75354 269.316 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.07496 0.07319 0.07804 0.93652 0.00000 0.00000 0.26142 0.26142 0.00000 0.06128 0.06128 — 244.368 244.368 0.00353 0.00948 0.01960 247.300 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01721 0.01680 0.01802 0.22777 0.00000 0.00000 0.05944 0.05944 0.00000 0.01392 0.01392 — 57.1418 57.1418 0.00081 0.00219 0.07515 57.8897 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00314 0.00307 0.00329 0.04157 0.00000 0.00000 0.01085 0.01085 0.00000 0.00254 0.00254 — 9.46048 9.46048 0.00013 0.00036 0.01244 9.58430 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4. Building Construction (2028)
3.4.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 22 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.18481 0.99143 8.92495 12.9352 0.02340 0.30024 — 0.30024 0.27622 — 0.27622 — 2,397.46 2,397.46 0.09725 0.01945 — 2,405.68 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.18481 0.99143 8.92495 12.9352 0.02340 0.30024 — 0.30024 0.27622 — 0.27622 — 2,397.46 2,397.46 0.09725 0.01945 — 2,405.68 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.57502 0.48116 4.33148 6.27777 0.01136 0.14571 — 0.14571 0.13406 — 0.13406 — 1,163.54 1,163.54 0.04720 0.00944 — 1,167.53 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.10494 0.08781 0.79050 1.14569 0.00207 0.02659 — 0.02659 0.02447 — 0.02447 — 192.637 192.637 0.00781 0.00156 — 193.299 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 23 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
3.4.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.46903 0.41797 0.37166 6.66858 0.00000 0.00000 1.40802 1.40802 0.00000 0.33004 0.33004 — 1,430.87 1,430.87 0.01662 0.05106 4.05860 1,450.56 Vendor 0.06841 0.03184 1.50577 0.48522 0.01152 0.02303 0.43813 0.46116 0.02303 0.12105 0.14408 — 1,479.00 1,479.00 0.02393 0.22669 3.50739 1,550.65 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.40372 0.39423 0.42035 5.04418 0.00000 0.00000 1.40802 1.40802 0.00000 0.33004 0.33004 — 1,316.18 1,316.18 0.01900 0.05106 0.10555 1,331.98 Vendor 0.06616 0.02958 1.57667 0.49763 0.01152 0.02303 0.43813 0.46116 0.02303 0.12105 0.14408 — 1,480.17 1,480.17 0.02393 0.22669 0.09073 1,548.41 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.19478 0.19017 0.20400 2.57830 0.00000 0.00000 0.67281 0.67281 0.00000 0.15754 0.15754 — 646.839 646.839 0.00922 0.02478 0.85071 655.305 Vendor 0.03265 0.01490 0.76925 0.23877 0.00559 0.01118 0.20987 0.22105 0.01118 0.05806 0.06923 — 718.030 718.030 0.01162 0.11002 0.73363 751.840 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.03555 0.03471 0.03723 0.47054 0.00000 0.00000 0.12279 0.12279 0.00000 0.02875 0.02875 — 107.092 107.092 0.00153 0.00410 0.14084 108.493 Vendor 0.00596 0.00272 0.14039 0.04358 0.00102 0.00204 0.03830 0.04034 0.00204 0.01060 0.01264 — 118.878 118.878 0.00192 0.01821 0.12146 124.476 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 24 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
3.5. Building Construction (2029)
3.5.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.15336 0.96514 8.58166 12.9012 0.02340 0.27564 — 0.27564 0.25359 — 0.25359 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.15336 0.96514 8.58166 12.9012 0.02340 0.27564 — 0.27564 0.25359 — 0.25359 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.38822 0.32486 2.88854 4.34249 0.00787 0.09278 — 0.09278 0.08536 — 0.08536 — 806.762 806.762 0.03273 0.00655 — 809.530 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
25 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e OffRoad Eq
uipment
0.07085 0.05929 0.52716 0.79250 0.00144 0.01693 — 0.01693 0.01558 — 0.01558 — 133.569 133.569 0.00542 0.00108 — 134.027 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.40610 0.39898 0.32298 6.23042 0.00000 0.00000 1.40802 1.40802 0.00000 0.33004 0.33004 — 1,405.46 1,405.46 0.01425 0.05106 3.62510 1,424.66 Vendor 0.06841 0.03184 1.45181 0.47257 0.01152 0.02303 0.43813 0.46116 0.02303 0.12105 0.14408 — 1,440.39 1,440.39 0.02393 0.21517 3.12866 1,508.24 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.38473 0.33367 0.37166 4.68202 0.00000 0.00000 1.40802 1.40802 0.00000 0.33004 0.33004 — 1,293.09 1,293.09 0.01662 0.05106 0.09424 1,308.82 Vendor 0.06616 0.02958 1.51232 0.48499 0.01152 0.02303 0.43813 0.46116 0.02303 0.12105 0.14408 — 1,441.58 1,441.58 0.02393 0.21517 0.08135 1,506.38 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.12950 0.11231 0.12510 1.66707 0.00000 0.00000 0.46663 0.46663 0.00000 0.10926 0.10926 — 440.722 440.722 0.00560 0.01719 0.52656 446.510 Vendor 0.02265 0.01034 0.51185 0.16135 0.00388 0.00775 0.14556 0.15331 0.00775 0.04027 0.04802 — 484.998 484.998 0.00806 0.07243 0.45560 507.238 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 26 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Annual — — — — — — — — — — — — — — — — — —
Worker 0.02363 0.02050 0.02283 0.30424 0.00000 0.00000 0.08516 0.08516 0.00000 0.01994 0.01994 — 72.9666 72.9666 0.00093 0.00285 0.08718 73.9249 Vendor 0.00413 0.00189 0.09341 0.02945 0.00071 0.00141 0.02656 0.02798 0.00141 0.00735 0.00876 — 80.2969 80.2969 0.00133 0.01199 0.07543 83.9790 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.6. Paving (2029)
3.6.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.80047 0.67262 6.45817 9.91841 0.01395 0.23904 — 0.23904 0.21992 — 0.21992 — 1,510.63 1,510.63 0.06128 0.01226 — 1,515.81 Paving 1.48323 1.48323 — — — — — — — — — — — — — — — —
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.80047 0.67262 6.45817 9.91841 0.01395 0.23904 — 0.23904 0.21992 — 0.21992 — 1,510.63 1,510.63 0.06128 0.01226 — 1,515.81 Paving 1.48323 1.48323 — — — — — — — — — — — — — — — —
27 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.16448 0.13821 1.32702 2.03803 0.00287 0.04912 — 0.04912 0.04519 — 0.04519 — 310.402 310.402 0.01259 0.00252 — 311.468 Paving 0.30477 0.30477 — — — — — — — — — — — — — — — —
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.03002 0.02522 0.24218 0.37194 0.00052 0.00896 — 0.00896 0.00825 — 0.00825 — 51.3907 51.3907 0.00208 0.00042 — 51.5670 Paving 0.05562 0.05562 — — — — — — — — — — — — — — — —
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.6.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.05655 0.05556 0.04497 0.86757 0.00000 0.00000 0.19606 0.19606 0.00000 0.04596 0.04596 — 195.708 195.708 0.00198 0.00711 0.50479 198.381 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 28 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.05357 0.04646 0.05175 0.65196 0.00000 0.00000 0.19606 0.19606 0.00000 0.04596 0.04596 — 180.060 180.060 0.00231 0.00711 0.01312 182.250 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01101 0.00955 0.01063 0.14171 0.00000 0.00000 0.03967 0.03967 0.00000 0.00929 0.00929 — 37.4641 37.4641 0.00048 0.00146 0.04476 37.9561 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00201 0.00174 0.00194 0.02586 0.00000 0.00000 0.00724 0.00724 0.00000 0.00170 0.00170 — 6.20260 6.20260 0.00008 0.00024 0.00741 6.28406 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.7. Architectural Coating (2029)
3.7.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
29 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.12385 0.10236 0.79416 1.11216 0.00173 0.01284 — 0.01284 0.01181 — 0.01181 — 133.510 133.510 0.00542 0.00108 — 133.968 Architect
ural
Coatings
49.1372 49.1372 — — — — — — — — — — — — — — — —
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.01866 0.01542 0.11967 0.16759 0.00026 0.00193 — 0.00193 0.00178 — 0.00178 — 20.1179 20.1179 0.00082 0.00016 — 20.1869 Architect
ural
Coatings
7.40424 7.40424 — — — — — — — — — — — — — — — —
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00341 0.00281 0.02184 0.03058 0.00005 0.00035 — 0.00035 0.00032 — 0.00032 — 3.33075 3.33075 0.00014 0.00003 — 3.34218 Architect
ural
Coatings
1.35127 1.35127 — — — — — — — — — — — — — — — —
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 30 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
3.7.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.07695 0.06673 0.07433 0.93640 0.00000 0.00000 0.28160 0.28160 0.00000 0.06601 0.06601 — 258.618 258.618 0.00332 0.01021 0.01885 261.763 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01159 0.01006 0.01120 0.14926 0.00000 0.00000 0.04178 0.04178 0.00000 0.00978 0.00978 — 39.4600 39.4600 0.00050 0.00154 0.04715 39.9782 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00212 0.00184 0.00204 0.02724 0.00000 0.00000 0.00762 0.00762 0.00000 0.00179 0.00179 — 6.53306 6.53306 0.00008 0.00025 0.00781 6.61885 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
31 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Govern
ment
(Civic
Center)
16.1983 14.7647 13.6396 137.466 0.38424 0.24641 36.2430 36.4894 0.23147 9.19604 9.42751 — 39,295.6 39,295.6 1.37908 1.64706 91.8310 39,912.7 Unenclo
sed
Parking
with
Elevator
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Asphalt
Surfaces
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Total 16.1983 14.7647 13.6396 137.466 0.38424 0.24641 36.2430 36.4894 0.23147 9.19604 9.42751 — 39,295.6 39,295.6 1.37908 1.64706 91.8310 39,912.7 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Govern
ment
(Civic
Center)
15.3860 13.9485 14.6164 114.970 0.36060 0.24653 36.2430 36.4895 0.23159 9.19604 9.42763 — 36,904.4 36,904.4 1.42439 1.69816 2.38113 37,448.5 Unenclo
sed
Parking
with
Elevator
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 32 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Other
Asphalt
Surfaces
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Total 15.3860 13.9485 14.6164 114.970 0.36060 0.24653 36.2430 36.4895 0.23159 9.19604 9.42763 — 36,904.4 36,904.4 1.42439 1.69816 2.38113 37,448.5 Annual — — — — — — — — — — — — — — — — — —
Govern
ment
(Civic
Center)
2.78423 2.52116 2.71385 21.7354 0.06643 0.04498 6.51257 6.55755 0.04225 1.65283 1.69509 — 6,167.13 6,167.13 0.23631 0.28360 6.56482 6,264.11 Unenclo
sed
Parking
with
Elevator
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Asphalt
Surfaces
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Total 2.78423 2.52116 2.71385 21.7354 0.06643 0.04498 6.51257 6.55755 0.04225 1.65283 1.69509 — 6,167.13 6,167.13 0.23631 0.28360 6.56482 6,264.11
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
33 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Govern
ment
(Civic
Center)
— — — — — — — — — — — — 5,089.78 5,089.78 0.37061 0.04492 — 5,112.43 Unenclo
sed
Parking
with
Elevator
— — — — — — — — — — — — 270.936 270.936 0.01973 0.00239 — 272.142 Other
Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 5,360.72 5,360.72 0.39034 0.04731 — 5,384.57 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Govern
ment
(Civic
Center)
— — — — — — — — — — — — 5,089.78 5,089.78 0.37061 0.04492 — 5,112.43 Unenclo
sed
Parking
with
Elevator
— — — — — — — — — — — — 270.936 270.936 0.01973 0.00239 — 272.142 Other
Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 5,360.72 5,360.72 0.39034 0.04731 — 5,384.57 Annual — — — — — — — — — — — — — — — — — —
34 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Govern
ment
(Civic
Center)
— — — — — — — — — — — — 842.671 842.671 0.06136 0.00744 — 846.421 Unenclo
sed
Parking
with
Elevator
— — — — — — — — — — — — 44.8566 44.8566 0.00327 0.00040 — 45.0562 Other
Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 887.528 887.528 0.06462 0.00783 — 891.478
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Govern
ment
(Civic
Center)
0.19154 0.09577 1.74130 1.46269 0.01045 0.13234 — 0.13234 0.13234 — 0.13234 — 2,077.66 2,077.66 0.18387 0.00391 — 2,083.43 Unenclo
sed
Parking
with
Elevator
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 35 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Other
Asphalt
Surfaces
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.19154 0.09577 1.74130 1.46269 0.01045 0.13234 — 0.13234 0.13234 — 0.13234 — 2,077.66 2,077.66 0.18387 0.00391 — 2,083.43 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Govern
ment
(Civic
Center)
0.19154 0.09577 1.74130 1.46269 0.01045 0.13234 — 0.13234 0.13234 — 0.13234 — 2,077.66 2,077.66 0.18387 0.00391 — 2,083.43 Unenclo
sed
Parking
with
Elevator
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.19154 0.09577 1.74130 1.46269 0.01045 0.13234 — 0.13234 0.13234 — 0.13234 — 2,077.66 2,077.66 0.18387 0.00391 — 2,083.43 Annual — — — — — — — — — — — — — — — — — —
Govern
ment
(Civic
Center)
0.03496 0.01748 0.31779 0.26694 0.00191 0.02415 — 0.02415 0.02415 — 0.02415 — 343.981 343.981 0.03044 0.00065 — 344.935 Unenclo
sed
Parking
with
Elevator
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 36 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Other
Asphalt
Surfaces
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.03496 0.01748 0.31779 0.26694 0.00191 0.02415 — 0.02415 0.02415 — 0.02415 — 343.981 343.981 0.03044 0.00065 — 344.935
4.3. Area Emissions by Source
4.3.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Products
5.17446 5.17446 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
0.74042 0.74042 — — — — — — — — — — — — — — — —
Landsca
pe Equip
ment
2.41933 2.23283 0.11434 13.5885 0.00081 0.02414 — 0.02414 0.01825 — 0.01825 — 55.8774 55.8774 0.00234 0.00048 — 56.0789 Total 8.33422 8.14772 0.11434 13.5885 0.00081 0.02414 — 0.02414 0.01825 — 0.01825 — 55.8774 55.8774 0.00234 0.00048 — 56.0789 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
37 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Consum
er
Products
5.17446 5.17446 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
0.74042 0.74042 — — — — — — — — — — — — — — — —
Total 5.91488 5.91488 — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Consum
er
Products
0.94434 0.94434 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
0.13513 0.13513 — — — — — — — — — — — — — — — —
Landsca
pe Equip
ment
0.30242 0.27910 0.01429 1.69856 0.00010 0.00302 — 0.00302 0.00228 — 0.00228 — 6.33640 6.33640 0.00027 0.00005 — 6.35925 Total 1.38188 1.35857 0.01429 1.69856 0.00010 0.00302 — 0.00302 0.00228 — 0.00228 — 6.33640 6.33640 0.00027 0.00005 — 6.35925
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
38 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Govern
ment
(Civic
Center)
— — — — — — — — — — — 89.4595 412.886 502.345 9.20311 0.22159 — 798.458 Unenclo
sed
Parking
with
Elevator
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 89.4595 412.886 502.345 9.20311 0.22159 — 798.458 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Govern
ment
(Civic
Center)
— — — — — — — — — — — 89.4595 412.886 502.345 9.20311 0.22159 — 798.458 Unenclo
sed
Parking
with
Elevator
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 89.4595 412.886 502.345 9.20311 0.22159 — 798.458 Annual — — — — — — — — — — — — — — — — — —
39 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Govern
ment
(Civic
Center)
— — — — — — — — — — — 14.8110 68.3580 83.1690 1.52368 0.03669 — 132.194 Unenclo
sed
Parking
with
Elevator
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 14.8110 68.3580 83.1690 1.52368 0.03669 — 132.194
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Govern
ment
(Civic
Center)
— — — — — — — — — — — 721.909 0.00000 721.909 72.1522 0.00000 — 2,525.71 40 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Unenclo
sed
Parking
with
Elevator
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 721.909 0.00000 721.909 72.1522 0.00000 — 2,525.71 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Govern
ment
(Civic
Center)
— — — — — — — — — — — 721.909 0.00000 721.909 72.1522 0.00000 — 2,525.71 Unenclo
sed
Parking
with
Elevator
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 721.909 0.00000 721.909 72.1522 0.00000 — 2,525.71 Annual — — — — — — — — — — — — — — — — — —
Govern
ment
(Civic
Center)
— — — — — — — — — — — 119.520 0.00000 119.520 11.9456 0.00000 — 418.161 41 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Unenclo
sed
Parking
with
Elevator
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 119.520 0.00000 119.520 11.9456 0.00000 — 418.161
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Govern
ment
(Civic
Center)
— — — — — — — — — — — — — — — — 0.57152 0.57152
Total — — — — — — — — — — — — — — — — 0.57152 0.57152
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
42 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Govern
ment
(Civic
Center)
— — — — — — — — — — — — — — — — 0.57152 0.57152
Total — — — — — — — — — — — — — — — — 0.57152 0.57152
Annual — — — — — — — — — — — — — — — — — —
Govern
ment
(Civic
Center)
— — — — — — — — — — — — — — — — 0.09462 0.09462
Total — — — — — — — — — — — — — — — — 0.09462 0.09462
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
43 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Equipme
nt Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Total — — — — — — — — — — — — — — — — — —
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 44 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Equipme
nt Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
45 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
46 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
47 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Site Preparation Site Preparation 10/1/2027 11/25/2027 5.00000 40.0000 — Grading Grading 11/26/2027 4/27/2028 5.00000 110.000 —
Building Construction Building Construction 4/28/2028 6/21/2029 5.00000 300.000 — Paving Paving 6/22/2029 10/4/2029 5.00000 75.0000 —
Architectural Coating Architectural Coating 10/5/2029 12/20/2029 5.00000 55.0000 —
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Site Preparation Rubber Tired Dozers Diesel Average 3.00000 8.00000 367.000 0.40000 Site Preparation Tractors/Loaders/
Backhoes
Diesel Average 4.00000 8.00000 84.0000 0.37000
48 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Grading Excavators Diesel Average 2.00000 8.00000 36.0000 0.38000 Grading Graders Diesel Average 1.000000 8.00000 148.000 0.41000 Grading Rubber Tired Dozers Diesel Average 1.000000 8.00000 367.000 0.40000 Grading Scrapers Diesel Average 2.00000 8.00000 423.000 0.48000 Grading Tractors/Loaders/
Backhoes
Diesel Average 2.00000 8.00000 84.0000 0.37000
Building Construction Cranes Diesel Average 1.000000 7.00000 367.000 0.29000 Building Construction Forklifts Diesel Average 3.00000 8.00000 82.0000 0.20000 Building Construction Generator Sets Diesel Average 1.000000 8.00000 14.0000 0.74000 Building Construction Tractors/Loaders/
Backhoes
Diesel Average 3.00000 7.00000 84.0000 0.37000
Building Construction Welders Diesel Average 1.000000 8.00000 46.0000 0.45000 Paving Pavers Diesel Average 2.00000 8.00000 81.0000 0.42000 Paving Paving Equipment Diesel Average 2.00000 8.00000 89.0000 0.36000 Paving Rollers Diesel Average 2.00000 8.00000 36.0000 0.38000 Architectural Coating Air Compressors Diesel Average 1.000000 6.00000 37.0000 0.48000
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Site Preparation Worker 17.5000 18.5000 LDA,LDT1,LDT2
49 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Site Preparation Vendor — 10.2000 HHDT,MHDT
Site Preparation Hauling 0.00000 20.0000 HHDT
Site Preparation Onsite truck — — HHDT
Grading Worker 20.0000 18.5000 LDA,LDT1,LDT2
Grading Vendor — 10.2000 HHDT,MHDT
Grading Hauling 0.00000 20.0000 HHDT
Grading Onsite truck — — HHDT
Building Construction Worker 107.721 18.5000 LDA,LDT1,LDT2 Building Construction Vendor 51.2076 10.2000 HHDT,MHDT
Building Construction Hauling 0.00000 20.0000 HHDT
Building Construction Onsite truck — — HHDT
Paving Worker 15.0000 18.5000 LDA,LDT1,LDT2
Paving Vendor — 10.2000 HHDT,MHDT
Paving Hauling 0.00000 20.0000 HHDT
Paving Onsite truck — — HHDT
Architectural Coating Worker 21.5443 18.5000 LDA,LDT1,LDT2 Architectural Coating Vendor — 10.2000 HHDT,MHDT
Architectural Coating Hauling 0.00000 20.0000 HHDT
Architectural Coating Onsite truck — — HHDT
5.4. Vehicles
50 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
Phase Name Residential Interior Area
Coated (sq ft)
Residential Exterior Area
Coated (sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior
Area Coated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 0.00000 0.00000 354,242 117,694 110,970
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Site Preparation — — 60.0000 0.00000 0.00000
Grading — — 330.000 0.00000 0.00000
Paving 0.00000 0.00000 0.00000 0.00000 42.4588
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 3 74% 74%
5.7. Construction Paving
Phase Name Land Use Area Paved (acres) % Asphalt
Paving Government (Civic Center) 0.00000 0%
51 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Phase Name Land Use Area Paved (acres) % Asphalt
Paving Unenclosed Parking with Elevator 0.88880 100%
Paving Other Asphalt Surfaces 41.5700 100%
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2027 0.00000 453.209 0.03300 0.00400
2028 0.00000 453.209 0.03300 0.00400
2029 0.00000 453.209 0.03300 0.00400
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Government (Civic
Center)
4,349.85 4,349.85 4,349.85 1,587,695 51,212.3 51,212.3 51,212.3 18,692,486 Unenclosed
Parking with
Elevator
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other Asphalt
Surfaces
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
5.10. Operational Area Sources
52 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
5.10.1. Hearths
Land Use Hearth Type Unmitigated (number) Mitigated (number) Government (Civic Center) Wood Fireplaces 0 0
Government (Civic Center) Gas Fireplaces 0 0
Government (Civic Center) Propane Fireplaces 0 0
Government (Civic Center) Electric Fireplaces 0 0
Government (Civic Center) No Fireplaces 0 0
Government (Civic Center) Conventional Wood Stoves 0 0
Government (Civic Center) Catalytic Wood Stoves 0 0
Government (Civic Center) Non-Catalytic Wood Stoves 0 0 Government (Civic Center) Pellet Wood Stoves 0 0
Unenclosed Parking with Elevator Wood Fireplaces 0 0
Unenclosed Parking with Elevator Gas Fireplaces 0 0
Unenclosed Parking with Elevator Propane Fireplaces 0 0 Unenclosed Parking with Elevator Electric Fireplaces 0 0 Unenclosed Parking with Elevator No Fireplaces 0 0
Unenclosed Parking with Elevator Conventional Wood Stoves 0 0 Unenclosed Parking with Elevator Catalytic Wood Stoves 0 0 Unenclosed Parking with Elevator Non-Catalytic Wood Stoves 0 0 Unenclosed Parking with Elevator Pellet Wood Stoves 0 0 Other Asphalt Surfaces Wood Fireplaces 0 0
Other Asphalt Surfaces Gas Fireplaces 0 0
53 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Land Use Hearth Type Unmitigated (number) Mitigated (number) Other Asphalt Surfaces Propane Fireplaces 0 0
Other Asphalt Surfaces Electric Fireplaces 0 0
Other Asphalt Surfaces No Fireplaces 0 0
Other Asphalt Surfaces Conventional Wood Stoves 0 0
Other Asphalt Surfaces Catalytic Wood Stoves 0 0
Other Asphalt Surfaces Non-Catalytic Wood Stoves 0 0
Other Asphalt Surfaces Pellet Wood Stoves 0 0
5.10.2. Architectural Coatings
Residential Interior Area Coated (sq
ft)
Residential Exterior Area Coated
(sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
0.00000 0.00000 354,242 117,694 110,970
5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00000
Summer Days day/yr 250.000
5.11. Operational Energy Consumption
5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) 54 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Government (Civic Center) 4,099,145 453.209 0.0330 0.0040 6,482,864 Unenclosed Parking with
Elevator
218,203 453.209 0.0330 0.0040 0.00000
Other Asphalt Surfaces 0.00000 453.209 0.0330 0.0040 0.00000
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Government (Civic Center) 46,685,026 2,774,749
Unenclosed Parking with Elevator 0.00000 0.00000
Other Asphalt Surfaces 0.00000 0.00000
5.13. Operational Waste Generation
5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Government (Civic Center) 1,339.50 0.00000
Unenclosed Parking with Elevator 0.00000 0.00000
Other Asphalt Surfaces 0.00000 0.00000
5.14. Operational Refrigeration and Air Conditioning Equipment 55 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
5.14.1. Unmitigated
Land Use Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Government (Civic
Center)
Household
refrigerators and/or
freezers
R-134a 1,430.00 0.01679 0.60000 0.00000 1.000000
Government (Civic
Center)
Other commercial A/
C and heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
56 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 29.6500 annual days of extreme heat Extreme Precipitation 2.30000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 28.4000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures 57 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters
Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 4 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 0 0 N/A
Wildfire 1 0 0 N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
58 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 4 1 1 4
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 1 1 2
Wildfire 1 1 1 2
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. 59 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 99.0666
AQ-PM 52.1842
AQ-DPM 18.8301
Drinking Water 10.2036
Lead Risk Housing 30.5356
Pesticides 67.3103
Toxic Releases 43.2233
Traffic 9.98750
Effect Indicators —
CleanUp Sites 0.00000
Groundwater 39.4488
Haz Waste Facilities/Generators 40.9265
Impaired Water Bodies 0.00000
Solid Waste 75.6701
Sensitive Population —
Asthma 71.3858
Cardio-vascular 93.1206
Low Birth Weights 79.9076
Socioeconomic Factor Indicators —
Education 63.1992
60 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Indicator Result for Project Census Tract
Housing 55.9569
Linguistic 7.37583
Poverty 51.5704
Unemployment 35.0208
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 63.39022199
Employed 50.78916977
Median HI 78.42935968
Education —
Bachelor's or higher 31.86192737
High school enrollment 14.38470422
Preschool enrollment 9.29038881
Transportation —
Auto Access 94.58488387
Active commuting 22.03259335
Social —
2-parent households 28.65392018
61 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Indicator Result for Project Census Tract
Voting 24.26536635
Neighborhood —
Alcohol availability 63.46721417
Park access 10.16296677
Retail density 10.3554472
Supermarket access 24.07288592
Tree canopy 1.000898242
Housing —
Homeownership 86.56486591
Housing habitability 65.54600282
Low-inc homeowner severe housing cost burden 33.51725908 Low-inc renter severe housing cost burden 30.14243552
Uncrowded housing 57.46182471
Health Outcomes —
Insured adults 61.5167458
Arthritis 43.8
Asthma ER Admissions 30.7
High Blood Pressure 36.7
Cancer (excluding skin) 52.2
Asthma 37.3
Coronary Heart Disease 63.8
62 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Indicator Result for Project Census Tract
Chronic Obstructive Pulmonary Disease 47.8
Diagnosed Diabetes 54.0
Life Expectancy at Birth 24.7
Cognitively Disabled 30.7
Physically Disabled 47.8
Heart Attack ER Admissions 3.5
Mental Health Not Good 42.4
Chronic Kidney Disease 55.3
Obesity 27.8
Pedestrian Injuries 60.6
Physical Health Not Good 48.3
Stroke 58.2
Health Risk Behaviors —
Binge Drinking 25.3
Current Smoker 39.2
No Leisure Time for Physical Activity 47.6
Climate Change Exposures —
Wildfire Risk 0.6
SLR Inundation Area 0.0
Children 58.1
Elderly 61.9
63 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026 Indicator Result for Project Census Tract
English Speaking 66.7
Foreign-born 28.7
Outdoor Workers 40.1
Climate Change Adaptive Capacity —
Impervious Surface Cover 87.8
Traffic Density 25.7
Traffic Access 23.0
Other Indices —
Hardship 56.2
Other Decision Support —
2016 Voting 28.4
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 58.0000 Healthy Places Index Score for Project Location (b) 43.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) Yes Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state. 64 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
8.1. Justifications
Screen Justification
Land Use Per PD
Construction: Construction Phases Project construction anticipated to begin Oct 2027 and complete at the end of 2029 Operations: Vehicle Data Per ITE Trip Generation Manual for Fire, Government Office Building, and Animal Hospital
8.3. Land Use
Model Parameter Units Default Value New Value
Lot Area acre 5.39486 7.54000
Landscape Area sq. ft — 175,000
Lot Area acre 1.77759 0.88880
Landscape Area sq. ft — 0.00000
65 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
8.4. Construction
8.4.1. Construction Phases
Phase Type Phase Name Model Parameter Default Value New Value Site Preparation Site Preparation Start Date 12/11/2027 10/1/2027 Site Preparation Site Preparation End Date 1/22/2028 11/25/2027 Site Preparation Site Preparation Work Days per Phase 30.0000 40.0000 Grading Grading Start Date 1/23/2028 11/26/2027
Grading Grading End Date 5/7/2028 4/27/2028
Grading Grading Work Days per Phase 75.0000 110.000
Building Construction Building Construction Start Date 5/8/2028 4/28/2028 Building Construction Building Construction End Date 3/10/2031 6/21/2029 Building Construction Building Construction Work Days per Phase 740.000 300.000 Paving Paving Start Date 3/11/2031 6/22/2029
Paving Paving End Date 5/27/2031 10/4/2029
Paving Paving Work Days per Phase 55.0000 75.0000
Architectural Coating Architectural Coating Start Date 5/28/2031 10/5/2029 Architectural Coating Architectural Coating End Date 8/13/2031 12/20/2029
8.5. Operations
8.5.1. Mobile Sources
66 / 67
Moreno Valley Public Safety Campus Detailed Report, 9/10/2026
8.5.1.1. Vehicle Data
Land Use Model Parameter Units Default Value New Value
Government (Civic Center) Weekday Trip Rate size/day 33.9800 18.5100 Government (Civic Center) Saturday Trip Rate size/day 0.00000 18.5100 Government (Civic Center) Sunday Trip Rate size/day 0.00000 18.5100 67 / 67
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Moreno Valley - Corporate Yard Fueling Station Detailed Report Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated
2.2.2. Onsite Construction Emissions by Year, Unmitigated
2.2.3. Offsite Construction Emissions by Year, Unmitigated
2.3. Operations Emissions Compared Against Thresholds
2.4. Operations Emissions by Sector, Unmitigated
3. Construction Emissions Details
3.1. Site Preparation (2027)
3.1.1. Onsite - Unmitigated
3.1.2. Offsite - Unmitigated
3.2. Grading (2027)
3.2.1. Onsite - Unmitigated
1 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026
3.2.2. Offsite - Unmitigated
3.3. Building Construction (2027)
3.3.1. Onsite - Unmitigated
3.3.2. Offsite - Unmitigated
3.4. Building Construction (2028)
3.4.1. Onsite - Unmitigated
3.4.2. Offsite - Unmitigated
3.5. Demolition (2027)
3.5.1. Onsite - Unmitigated
3.5.2. Offsite - Unmitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
4.3. Area Emissions by Source
4.3.1. Unmitigated
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
2 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
3 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.9. Operational Mobile Sources
5.9.1. Unmitigated
5.10. Operational Area Sources
5.10.1. Hearths
5.10.2. Architectural Coatings
5.10.3. Landscape Equipment
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
4 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
5 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026
8.1. Justifications
8.3. Land Use
8.5. Operations
8.5.1. Mobile Sources
8.5.1.1. Vehicle Data
6 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name Moreno Valley - Corporate Yard Fueling Station Construction Start Date 10/1/2027
Operational Year 2028
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.50000
Precipitation (days) 24.0000
Location Wilmot St & Brodiaea Ave, Moreno Valley, CA 92555, USA County Riverside-South Coast
City Moreno Valley
Air District South Coast AQMD
Air Basin South Coast
TAZ 5583
EDFZ 11
Electric Utility Moreno Valley Utility
Gas Utility Southern California Gas
7 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Data Field Value
App Version 2022.1.1.45
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Gasoline/Service
Station
4.00000 Pump 0.01000 325.000 0.00000 — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 1.20778 1.01629 8.73197 9.94106 0.01583 0.39118 1.68593 2.07711 0.35989 0.71313 1.07302 — 1,807.95 1,807.95 0.07087 0.01747 0.01157 1,814.93 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.10297 0.08650 0.80918 1.21007 0.00205 0.02941 0.01385 0.04325 0.02705 0.00493 0.03198 — 223.785 223.785 0.00895 0.00203 0.00678 224.620 8 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.01879 0.01579 0.14768 0.22084 0.00037 0.00537 0.00253 0.00789 0.00494 0.00090 0.00584 — 37.0501 37.0501 0.00148 0.00034 0.00112 37.1884
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated Includes both onsite and offsite emissions.
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2027 1.20778 1.01629 8.73197 9.94106 0.01583 0.39118 1.68593 2.07711 0.35989 0.71313 1.07302 — 1,807.95 1,807.95 0.07087 0.01747 0.01157 1,814.93 2028 0.54699 0.45965 4.30454 6.91233 0.01206 0.14881 0.00182 0.15062 0.13691 0.00044 0.13735 — 1,307.37 1,307.37 0.05296 0.01087 0.00020 1,311.93 Average
Daily
— — — — — — — — — — — — — — — — — —
2027 0.10297 0.08650 0.80918 1.21007 0.00205 0.02941 0.01385 0.04325 0.02705 0.00493 0.03198 — 223.785 223.785 0.00895 0.00203 0.00678 224.620 2028 0.07386 0.06207 0.58124 0.93340 0.00163 0.02009 0.00024 0.02033 0.01849 0.00006 0.01855 — 176.535 176.535 0.00715 0.00147 0.00044 177.151 Annual — — — — — — — — — — — — — — — — — —
2027 0.01879 0.01579 0.14768 0.22084 0.00037 0.00537 0.00253 0.00789 0.00494 0.00090 0.00584 — 37.0501 37.0501 0.00148 0.00034 0.00112 37.1884 2028 0.01348 0.01133 0.10608 0.17035 0.00030 0.00367 0.00004 0.00371 0.00337 0.00001 0.00338 — 29.2274 29.2274 0.00118 0.00024 0.00007 29.3294 9 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026
2.2.2. Onsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2027 1.17562 0.98785 8.70254 9.56448 0.01583 0.39118 1.58790 1.97908 0.35989 0.69015 1.05004 — 1,714.58 1,714.58 0.06955 0.01391 0.00000 1,720.46 2028 0.54653 0.45924 4.30249 6.90694 0.01205 0.14878 0.00000 0.14878 0.13688 0.00000 0.13688 — 1,304.56 1,304.56 0.05292 0.01058 0.00000 1,309.03 Average
Daily
— — — — — — — — — — — — — — — — — —
2027 0.10147 0.08519 0.80703 1.19180 0.00205 0.02939 0.00927 0.03866 0.02704 0.00385 0.03089 — 218.870 218.870 0.00888 0.00178 0.00000 219.621 2028 0.07380 0.06201 0.58096 0.93264 0.00163 0.02009 0.00000 0.02009 0.01848 0.00000 0.01848 — 176.153 176.153 0.00715 0.00143 0.00000 176.758 Annual — — — — — — — — — — — — — — — — — —
2027 0.01852 0.01555 0.14728 0.21750 0.00037 0.00536 0.00169 0.00706 0.00494 0.00070 0.00564 — 36.2364 36.2364 0.00147 0.00029 0.00000 36.3607 2028 0.01347 0.01132 0.10603 0.17021 0.00030 0.00367 0.00000 0.00367 0.00337 0.00000 0.00337 — 29.1642 29.1642 0.00118 0.00024 0.00000 29.2643
2.2.3. Offsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
10 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2027 0.04344 0.03812 0.05439 0.50574 0.00009 0.00026 0.13433 0.13459 0.00026 0.03165 0.03192 — 137.775 137.775 0.00202 0.00682 0.01157 139.870 2028 0.00046 0.00041 0.00205 0.00539 0.00001 0.00002 0.00182 0.00184 0.00002 0.00044 0.00047 — 2.81042 2.81042 0.00004 0.00029 0.00020 2.89666 Average
Daily
— — — — — — — — — — — — — — — — — —
2027 0.00150 0.00131 0.00215 0.01827 < 0.0000
05 0.00001 0.00458 0.00459 0.00001 0.00108 0.00109 — 4.91506 4.91506 0.00007 0.00025 0.00678 4.99902 2028 0.00006 0.00006 0.00028 0.00076 < 0.0000
05 < 0.0000
05 0.00024 0.00024 < 0.0000
05 0.00006 0.00006 — 0.38156 0.38156 0.00001 0.00004 0.00044 0.39362 Annual — — — — — — — — — — — — — — — — — —
2027 0.00027 0.00024 0.00039 0.00333 < 0.0000
05 < 0.0000
05 0.00084 0.00084 < 0.0000
05 0.00020 0.00020 — 0.81374 0.81374 0.00001 0.00004 0.00112 0.82764 2028 0.00001 0.00001 0.00005 0.00014 < 0.0000
05 < 0.0000
05 0.00004 0.00004 < 0.0000
05 0.00001 0.00001 — 0.06317 0.06317 < 0.0000
05 0.00001 0.00007 0.06517
2.3. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 5.70167 5.20998 4.89019 47.2356 0.12643 0.08730 11.4703 11.5576 0.08201 2.91093 2.99294 1.26361 12,936.5 12,937.8 0.59727 0.55180 37.1526 13,154.3 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
11 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Unmit. 5.39073 4.89761 5.24005 39.5112 0.11867 0.08732 11.4703 11.5576 0.08204 2.91093 2.99297 1.26361 12,152.0 12,153.3 0.61343 0.56927 0.96334 12,339.3 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 5.35166 4.85689 5.33550 40.9569 0.11979 0.08731 11.2939 11.3812 0.08202 2.86683 2.94885 1.26361 12,265.5 12,266.7 0.61457 0.57437 16.0422 12,469.3 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.97668 0.88638 0.97373 7.47464 0.02186 0.01593 2.06113 2.07706 0.01497 0.52320 0.53817 0.20921 2,030.69 2,030.90 0.10175 0.09509 2.65597 2,064.44
2.4. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 5.69096 5.19967 4.88632 47.2183 0.12641 0.08699 11.4703 11.5573 0.08171 2.91093 2.99264 — 12,927.7 12,927.7 0.47000 0.55151 37.1526 13,141.0 Area 0.01030 0.01010 0.00012 0.01413 < 0.0000
05 0.00003 — 0.00003 0.00002 — 0.00002 — 0.05813 0.05813 < 0.0000 05 < 0.0000
05 — 0.05833
Energy 0.00041 0.00021 0.00375 0.00315 0.00002 0.00028 — 0.00028 0.00028 — 0.00028 — 8.33513 8.33513 0.00068 0.00004 — 8.36473 Water — — — — — — — — — — — 0.10180 0.44906 0.55086 0.01047 0.00025 — 0.88775 Waste — — — — — — — — — — — 1.16181 0.00000 1.16181 0.11612 0.00000 — 4.06477 Total 5.70167 5.20998 4.89019 47.2356 0.12643 0.08730 11.4703 11.5576 0.08201 2.91093 2.99294 1.26361 12,936.5 12,937.8 0.59727 0.55180 37.1526 13,154.3 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
12 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Mobile 5.38254 4.88962 5.23630 39.5081 0.11865 0.08704 11.4703 11.5573 0.08175 2.91093 2.99268 — 12,143.3 12,143.3 0.48616 0.56898 0.96334 12,325.9 Area 0.00778 0.00778 — — — — — — — — — — — — — — — —
Energy 0.00041 0.00021 0.00375 0.00315 0.00002 0.00028 — 0.00028 0.00028 — 0.00028 — 8.33513 8.33513 0.00068 0.00004 — 8.36473 Water — — — — — — — — — — — 0.10180 0.44906 0.55086 0.01047 0.00025 — 0.88775 Waste — — — — — — — — — — — 1.16181 0.00000 1.16181 0.11612 0.00000 — 4.06477 Total 5.39073 4.89761 5.24005 39.5112 0.11867 0.08732 11.4703 11.5576 0.08204 2.91093 2.99297 1.26361 12,152.0 12,153.3 0.61343 0.56927 0.96334 12,339.3 Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 5.34174 4.84731 5.33167 40.9441 0.11977 0.08701 11.2939 11.3809 0.08173 2.86683 2.94855 — 12,256.7 12,256.7 0.48730 0.57407 16.0422 12,456.0 Area 0.00950 0.00937 0.00008 0.00968 < 0.0000
05 0.00002 — 0.00002 0.00001 — 0.00001 — 0.03981 0.03981 < 0.0000 05 < 0.0000
05 — 0.03996
Energy 0.00041 0.00021 0.00375 0.00315 0.00002 0.00028 — 0.00028 0.00028 — 0.00028 — 8.33513 8.33513 0.00068 0.00004 — 8.36473 Water — — — — — — — — — — — 0.10180 0.44906 0.55086 0.01047 0.00025 — 0.88775 Waste — — — — — — — — — — — 1.16181 0.00000 1.16181 0.11612 0.00000 — 4.06477 Total 5.35166 4.85689 5.33550 40.9569 0.11979 0.08731 11.2939 11.3812 0.08202 2.86683 2.94885 1.26361 12,265.5 12,266.7 0.61457 0.57437 16.0422 12,469.3 Annual — — — — — — — — — — — — — — — — — —
Mobile 0.97487 0.88463 0.97303 7.47230 0.02186 0.01588 2.06113 2.07701 0.01491 0.52320 0.53811 — 2,029.23 2,029.23 0.08068 0.09504 2.65597 2,062.23 Area 0.00173 0.00171 0.00001 0.00177 < 0.0000
05 < 0.0000
05 — < 0.0000
05 < 0.0000
05 — < 0.0000
05 — 0.00659 0.00659 < 0.0000
05 < 0.0000
05 — 0.00662
Energy 0.00008 0.00004 0.00068 0.00057 < 0.0000
05 0.00005 — 0.00005 0.00005 — 0.00005 — 1.37998 1.37998 0.00011 0.00001 — 1.38488 Water — — — — — — — — — — — 0.01685 0.07435 0.09120 0.00173 0.00004 — 0.14698 Waste — — — — — — — — — — — 0.19235 0.00000 0.19235 0.01922 0.00000 — 0.67297 13 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Total 0.97668 0.88638 0.97373 7.47464 0.02186 0.01593 2.06113 2.07706 0.01497 0.52320 0.53817 0.20921 2,030.69 2,030.90 0.10175 0.09509 2.65597 2,064.44
3. Construction Emissions Details
3.1. Site Preparation (2027)
3.1.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.49174 0.41320 3.43511 5.55625 0.00793 0.16579 — 0.16579 0.15253 — 0.15253 — 858.867 858.867 0.03484 0.00697 — 861.815 Dust
From
Material
Moveme
nt
— — — — — — 0.13787 0.13787 — 0.01489 0.01489 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
14 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e OffRoad Eq
uipment
0.00135 0.00113 0.00941 0.01522 0.00002 0.00045 — 0.00045 0.00042 — 0.00042 — 2.35306 2.35306 0.00010 0.00002 — 2.36114 Dust
From
Material
Moveme
nt
— — — — — — 0.00038 0.00038 — 0.00004 0.00004 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00025 0.00021 0.00172 0.00278 < 0.0000
05 0.00008 — 0.00008 0.00008 — 0.00008 — 0.38958 0.38958 0.00002 < 0.0000 05 — 0.39091
Dust
From
Material
Moveme
nt
— — — — — — 0.00007 0.00007 — 0.00001 0.00001 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
15 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.02144 0.01896 0.01962 0.25105 0.00000 0.00000 0.06535 0.06535 0.00000 0.01532 0.01532 — 62.2445 62.2445 0.00088 0.00237 0.00545 62.9782 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00006 0.00005 0.00006 0.00072 0.00000 0.00000 0.00018 0.00018 0.00000 0.00004 0.00004 — 0.17269 0.17269 < 0.0000 05 0.00001 0.00025 0.17493
Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00001 0.00001 0.00001 0.00013 0.00000 0.00000 0.00003 0.00003 0.00000 0.00001 0.00001 — 0.02859 0.02859 < 0.0000 05 < 0.0000
05 0.00004 0.02896
Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2. Grading (2027)
3.2.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
16 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.17562 0.98785 8.70254 9.56448 0.01583 0.39118 — 0.39118 0.35989 — 0.35989 — 1,714.58 1,714.58 0.06955 0.01391 — 1,720.46 Dust
From
Material
Moveme
nt
— — — — — — 1.58790 1.58790 — 0.69015 0.69015 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00644 0.00541 0.04769 0.05241 0.00009 0.00214 — 0.00214 0.00197 — 0.00197 — 9.39496 9.39496 0.00038 0.00008 — 9.42720 Dust
From
Material
Moveme
nt
— — — — — — 0.00870 0.00870 — 0.00378 0.00378 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00118 0.00099 0.00870 0.00956 0.00002 0.00039 — 0.00039 0.00036 — 0.00036 — 1.55544 1.55544 0.00006 0.00001 — 1.56078 17 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Dust
From
Material
Moveme
nt
— — — — — — 0.00159 0.00159 — 0.00069 0.00069 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.03216 0.02844 0.02943 0.37658 0.00000 0.00000 0.09803 0.09803 0.00000 0.02298 0.02298 — 93.3667 93.3667 0.00132 0.00355 0.00818 94.4674 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00018 0.00016 0.00018 0.00217 0.00000 0.00000 0.00053 0.00053 0.00000 0.00012 0.00012 — 0.51807 0.51807 0.00001 0.00002 0.00075 0.52480 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
18 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00003 0.00003 0.00003 0.00040 0.00000 0.00000 0.00010 0.00010 0.00000 0.00002 0.00002 — 0.08577 0.08577 < 0.0000 05 < 0.0000
05 0.00012 0.08689
Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3. Building Construction (2027)
3.3.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.56653 0.47604 4.55564 6.89930 0.01205 0.16712 — 0.16712 0.15375 — 0.15375 — 1,304.35 1,304.35 0.05291 0.01058 — 1,308.83 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.07982 0.06707 0.64189 0.97211 0.00170 0.02355 — 0.02355 0.02166 — 0.02166 — 183.783 183.783 0.00746 0.00149 — 184.414 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 19 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.01457 0.01224 0.11714 0.17741 0.00031 0.00430 — 0.00430 0.00395 — 0.00395 — 30.4274 30.4274 0.00123 0.00025 — 30.5319 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.00045 0.00039 0.00041 0.00522 0.00000 0.00000 0.00136 0.00136 0.00000 0.00032 0.00032 — 1.29469 1.29469 0.00002 0.00005 0.00011 1.30995 Vendor 0.00007 0.00003 0.00172 0.00053 0.00001 0.00002 0.00046 0.00048 0.00002 0.00013 0.00015 — 1.57533 1.57533 0.00004 0.00024 0.00010 1.64660 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00006 0.00006 0.00006 0.00077 0.00000 0.00000 0.00019 0.00019 0.00000 0.00004 0.00004 — 0.18473 0.18473 < 0.0000 05 0.00001 0.00027 0.18713
Vendor 0.00001 < 0.0000
05 0.00024 0.00007 < 0.0000
05 < 0.0000
05 0.00006 0.00007 < 0.0000
05 0.00002 0.00002 — 0.22187 0.22187 0.00001 0.00003 0.00024 0.23214 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
20 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00001 0.00001 0.00001 0.00014 0.00000 0.00000 0.00003 0.00003 0.00000 0.00001 0.00001 — 0.03058 0.03058 < 0.0000 05 < 0.0000
05 0.00004 0.03098
Vendor < 0.0000
05 < 0.0000
05 0.00004 0.00001 < 0.0000
05 < 0.0000
05 0.00001 0.00001 < 0.0000
05 < 0.0000
05 < 0.0000
05 — 0.03673 0.03673 < 0.0000
05 0.00001 0.00004 0.03843
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4. Building Construction (2028)
3.4.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.54653 0.45924 4.30249 6.90694 0.01205 0.14878 — 0.14878 0.13688 — 0.13688 — 1,304.56 1,304.56 0.05292 0.01058 — 1,309.03 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.07380 0.06201 0.58096 0.93264 0.00163 0.02009 — 0.02009 0.01848 — 0.01848 — 176.153 176.153 0.00715 0.00143 — 176.758 21 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.01347 0.01132 0.10603 0.17021 0.00030 0.00367 — 0.00367 0.00337 — 0.00337 — 29.1642 29.1642 0.00118 0.00024 — 29.2643 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.00039 0.00038 0.00041 0.00487 0.00000 0.00000 0.00136 0.00136 0.00000 0.00032 0.00032 — 1.27071 1.27071 0.00002 0.00005 0.00010 1.28596 Vendor 0.00007 0.00003 0.00164 0.00052 0.00001 0.00002 0.00046 0.00048 0.00002 0.00013 0.00015 — 1.53971 1.53971 0.00002 0.00024 0.00009 1.61070 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00005 0.00005 0.00005 0.00069 0.00000 0.00000 0.00018 0.00018 0.00000 0.00004 0.00004 — 0.17375 0.17375 < 0.0000 05 0.00001 0.00023 0.17602
Vendor 0.00001 < 0.0000
05 0.00022 0.00007 < 0.0000
05 < 0.0000
05 0.00006 0.00006 < 0.0000
05 0.00002 0.00002 — 0.20781 0.20781 < 0.0000
05 0.00003 0.00021 0.21760
22 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00001 0.00001 0.00001 0.00013 0.00000 0.00000 0.00003 0.00003 0.00000 0.00001 0.00001 — 0.02877 0.02877 < 0.0000 05 < 0.0000
05 0.00004 0.02914
Vendor < 0.0000
05 < 0.0000
05 0.00004 0.00001 < 0.0000
05 < 0.0000
05 0.00001 0.00001 < 0.0000
05 < 0.0000
05 < 0.0000
05 — 0.03441 0.03441 < 0.0000
05 0.00001 0.00004 0.03603
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5. Demolition (2027)
3.5.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.50582 0.42226 3.94364 5.55013 0.00877 0.11863 — 0.11863 0.10914 — 0.10914 — 851.847 851.847 0.03455 0.00691 — 854.771 Demoliti
on
— — — — — — 0.00691 0.00691 — 0.00105 0.00105 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 23 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.01386 0.01157 0.10804 0.15206 0.00024 0.00325 — 0.00325 0.00299 — 0.00299 — 23.3383 23.3383 0.00095 0.00019 — 23.4184 Demoliti
on
— — — — — — 0.00019 0.00019 — 0.00003 0.00003 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00253 0.00211 0.01972 0.02775 0.00004 0.00059 — 0.00059 0.00055 — 0.00055 — 3.86392 3.86392 0.00016 0.00003 — 3.87718 Demoliti
on
— — — — — — 0.00003 0.00003 — 0.00001 0.00001 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04288 0.03792 0.03924 0.50210 0.00000 0.00000 0.13071 0.13071 0.00000 0.03064 0.03064 — 124.489 124.489 0.00176 0.00474 0.01091 125.956 24 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00056 0.00020 0.01515 0.00364 0.00009 0.00026 0.00362 0.00388 0.00026 0.00102 0.00128 — 13.2861 13.2861 0.00026 0.00208 0.00066 13.9134 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00117 0.00104 0.00119 0.01444 0.00000 0.00000 0.00353 0.00353 0.00000 0.00083 0.00083 — 3.45381 3.45381 0.00005 0.00013 0.00497 3.49869 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00002 0.00001 0.00042 0.00010 < 0.0000
05 0.00001 0.00010 0.00011 0.00001 0.00003 0.00003 — 0.36389 0.36389 0.00001 0.00006 0.00030 0.38132 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00021 0.00019 0.00022 0.00264 0.00000 0.00000 0.00064 0.00064 0.00000 0.00015 0.00015 — 0.57182 0.57182 0.00001 0.00002 0.00082 0.57925 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling < 0.0000
05 < 0.0000
05 0.00008 0.00002 < 0.0000
05 < 0.0000
05 0.00002 0.00002 < 0.0000
05 0.00001 0.00001 — 0.06025 0.06025 < 0.0000
05 0.00001 0.00005 0.06313
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 25 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Gasoline
/Service
Station
5.69096 5.19967 4.88632 47.2183 0.12641 0.08699 11.4703 11.5573 0.08171 2.91093 2.99264 — 12,927.7 12,927.7 0.47000 0.55151 37.1526 13,141.0 Total 5.69096 5.19967 4.88632 47.2183 0.12641 0.08699 11.4703 11.5573 0.08171 2.91093 2.99264 — 12,927.7 12,927.7 0.47000 0.55151 37.1526 13,141.0 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Gasoline
/Service
Station
5.38254 4.88962 5.23630 39.5081 0.11865 0.08704 11.4703 11.5573 0.08175 2.91093 2.99268 — 12,143.3 12,143.3 0.48616 0.56898 0.96334 12,325.9 Total 5.38254 4.88962 5.23630 39.5081 0.11865 0.08704 11.4703 11.5573 0.08175 2.91093 2.99268 — 12,143.3 12,143.3 0.48616 0.56898 0.96334 12,325.9 Annual — — — — — — — — — — — — — — — — — —
Gasoline
/Service
Station
0.97487 0.88463 0.97303 7.47230 0.02186 0.01588 2.06113 2.07701 0.01491 0.52320 0.53811 — 2,029.23 2,029.23 0.08068 0.09504 2.65597 2,062.23 Total 0.97487 0.88463 0.97303 7.47230 0.02186 0.01588 2.06113 2.07701 0.01491 0.52320 0.53811 — 2,029.23 2,029.23 0.08068 0.09504 2.65597 2,062.23
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 26 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Gasoline
/Service
Station
— — — — — — — — — — — — 3.86152 3.86152 0.00028 0.00003 — 3.87871 Total — — — — — — — — — — — — 3.86152 3.86152 0.00028 0.00003 — 3.87871 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Gasoline
/Service
Station
— — — — — — — — — — — — 3.86152 3.86152 0.00028 0.00003 — 3.87871 Total — — — — — — — — — — — — 3.86152 3.86152 0.00028 0.00003 — 3.87871 Annual — — — — — — — — — — — — — — — — — —
Gasoline
/Service
Station
— — — — — — — — — — — — 0.63932 0.63932 0.00005 0.00001 — 0.64216 Total — — — — — — — — — — — — 0.63932 0.63932 0.00005 0.00001 — 0.64216
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
27 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Gasoline
/Service
Station
0.00041 0.00021 0.00375 0.00315 0.00002 0.00028 — 0.00028 0.00028 — 0.00028 — 4.47361 4.47361 0.00040 0.00001 — 4.48602 Total 0.00041 0.00021 0.00375 0.00315 0.00002 0.00028 — 0.00028 0.00028 — 0.00028 — 4.47361 4.47361 0.00040 0.00001 — 4.48602 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Gasoline
/Service
Station
0.00041 0.00021 0.00375 0.00315 0.00002 0.00028 — 0.00028 0.00028 — 0.00028 — 4.47361 4.47361 0.00040 0.00001 — 4.48602 Total 0.00041 0.00021 0.00375 0.00315 0.00002 0.00028 — 0.00028 0.00028 — 0.00028 — 4.47361 4.47361 0.00040 0.00001 — 4.48602 Annual — — — — — — — — — — — — — — — — — —
Gasoline
/Service
Station
0.00008 0.00004 0.00068 0.00057 < 0.0000
05 0.00005 — 0.00005 0.00005 — 0.00005 — 0.74066 0.74066 0.00007 < 0.0000 05 — 0.74271
Total 0.00008 0.00004 0.00068 0.00057 < 0.0000
05 0.00005 — 0.00005 0.00005 — 0.00005 — 0.74066 0.74066 0.00007 < 0.0000 05 — 0.74271
4.3. Area Emissions by Source
4.3.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
28 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Consum
er
Products
0.00695 0.00695 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
0.00083 0.00083 — — — — — — — — — — — — — — — —
Landsca
pe Equip
ment
0.00252 0.00232 0.00012 0.01413 < 0.0000
05 0.00003 — 0.00003 0.00002 — 0.00002 — 0.05813 0.05813 < 0.0000 05 < 0.0000
05 — 0.05833
Total 0.01030 0.01010 0.00012 0.01413 < 0.0000
05 0.00003 — 0.00003 0.00002 — 0.00002 — 0.05813 0.05813 < 0.0000 05 < 0.0000
05 — 0.05833
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Products
0.00695 0.00695 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
0.00083 0.00083 — — — — — — — — — — — — — — — —
Total 0.00778 0.00778 — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Consum
er
Products
0.00127 0.00127 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
0.00015 0.00015 — — — — — — — — — — — — — — — —
Landsca
pe Equip
ment
0.00031 0.00029 0.00001 0.00177 < 0.0000
05 < 0.0000
05 — < 0.0000
05 < 0.0000
05 — < 0.0000
05 — 0.00659 0.00659 < 0.0000
05 < 0.0000
05 — 0.00662
29 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Total 0.00173 0.00171 0.00001 0.00177 < 0.0000
05 < 0.0000
05 — < 0.0000
05 < 0.0000
05 — < 0.0000
05 — 0.00659 0.00659 < 0.0000
05 < 0.0000
05 — 0.00662
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Gasoline
/Service
Station
— — — — — — — — — — — 0.10180 0.44906 0.55086 0.01047 0.00025 — 0.88775 Total — — — — — — — — — — — 0.10180 0.44906 0.55086 0.01047 0.00025 — 0.88775 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Gasoline
/Service
Station
— — — — — — — — — — — 0.10180 0.44906 0.55086 0.01047 0.00025 — 0.88775 Total — — — — — — — — — — — 0.10180 0.44906 0.55086 0.01047 0.00025 — 0.88775 Annual — — — — — — — — — — — — — — — — — —
Gasoline
/Service
Station
— — — — — — — — — — — 0.01685 0.07435 0.09120 0.00173 0.00004 — 0.14698 Total — — — — — — — — — — — 0.01685 0.07435 0.09120 0.00173 0.00004 — 0.14698 30 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Gasoline
/Service
Station
— — — — — — — — — — — 1.16181 0.00000 1.16181 0.11612 0.00000 — 4.06477 Total — — — — — — — — — — — 1.16181 0.00000 1.16181 0.11612 0.00000 — 4.06477 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Gasoline
/Service
Station
— — — — — — — — — — — 1.16181 0.00000 1.16181 0.11612 0.00000 — 4.06477 Total — — — — — — — — — — — 1.16181 0.00000 1.16181 0.11612 0.00000 — 4.06477 Annual — — — — — — — — — — — — — — — — — —
Gasoline
/Service
Station
— — — — — — — — — — — 0.19235 0.00000 0.19235 0.01922 0.00000 — 0.67297 Total — — — — — — — — — — — 0.19235 0.00000 0.19235 0.01922 0.00000 — 0.67297
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
31 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
32 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Equipme
nt Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 33 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Equipme
nt Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
34 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
35 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
36 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Site Preparation Site Preparation 10/16/2027 10/17/2027 5.00000 1.000000 — Grading Grading 10/18/2027 10/20/2027 5.00000 2.00000 — Building Construction Building Construction 10/21/2027 3/9/2028 5.00000 100.0000 — Demolition Demolition 10/1/2027 10/15/2027 5.00000 10.00000 —
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Site Preparation Tractors/Loaders/
Backhoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Site Preparation Graders Diesel Average 1.000000 8.00000 148.000 0.41000 Grading Graders Diesel Average 1.000000 6.00000 148.000 0.41000 37 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Grading Rubber Tired Dozers Diesel Average 1.000000 6.00000 367.000 0.40000 Grading Tractors/Loaders/
Backhoes
Diesel Average 1.000000 7.00000 84.0000 0.37000
Building Construction Cranes Diesel Average 1.000000 4.00000 367.000 0.29000 Building Construction Forklifts Diesel Average 2.00000 6.00000 82.0000 0.20000 Building Construction Tractors/Loaders/
Backhoes
Diesel Average 2.00000 8.00000 84.0000 0.37000
Demolition Tractors/Loaders/
Backhoes
Diesel Average 2.00000 6.00000 84.0000 0.37000
Demolition Rubber Tired Dozers Diesel Average 1.000000 1.000000 367.000 0.40000 Demolition Concrete/Industrial
Saws
Diesel Average 1.000000 8.00000 33.0000 0.73000
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Site Preparation Worker 5.00000 18.5000 LDA,LDT1,LDT2
Site Preparation Vendor — 10.2000 HHDT,MHDT
Site Preparation Hauling 0.00000 20.0000 HHDT
Site Preparation Onsite truck — — HHDT
Grading Worker 7.50000 18.5000 LDA,LDT1,LDT2
Grading Vendor — 10.2000 HHDT,MHDT
38 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Grading Hauling 0.00000 20.0000 HHDT
Grading Onsite truck — — HHDT
Building Construction Worker 0.10400 18.5000 LDA,LDT1,LDT2 Building Construction Vendor 0.05327 10.2000 HHDT,MHDT
Building Construction Hauling 0.00000 20.0000 HHDT
Building Construction Onsite truck — — HHDT
Demolition Worker 10.00000 18.5000 LDA,LDT1,LDT2
Demolition Vendor — 10.2000 HHDT,MHDT
Demolition Hauling 0.20000 20.0000 HHDT
Demolition Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
39 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (Ton of Debris)
Acres Paved (acres)
Site Preparation — — 0.50000 0.00000 0.00000
Grading — — 1.50000 0.00000 0.00000
Demolition 0.00000 0.00000 0.00000 5.00000 0.00000
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 3 74% 74%
Water Demolished Area 2 36% 36%
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2027 0.00000 453.209 0.03300 0.00400
2028 0.00000 453.209 0.03300 0.00400
5.9. Operational Mobile Sources
5.9.1. Unmitigated
40 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Gasoline/Service
Station
1,376.00 1,376.00 1,376.00 502,240 16,200.1 16,200.1 16,200.1 5,913,045
5.10. Operational Area Sources
5.10.1. Hearths
Land Use Hearth Type Unmitigated (number) Mitigated (number) Gasoline/Service Station Wood Fireplaces 0 0
Gasoline/Service Station Gas Fireplaces 0 0
Gasoline/Service Station Propane Fireplaces 0 0
Gasoline/Service Station Electric Fireplaces 0 0
Gasoline/Service Station No Fireplaces 0 0
Gasoline/Service Station Conventional Wood Stoves 0 0
Gasoline/Service Station Catalytic Wood Stoves 0 0
Gasoline/Service Station Non-Catalytic Wood Stoves 0 0
Gasoline/Service Station Pellet Wood Stoves 0 0
5.10.2. Architectural Coatings
Residential Interior Area Coated (sq
ft)
Residential Exterior Area Coated
(sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
0.00000 0.00000 487.500 162.500 —
5.10.3. Landscape Equipment
41 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Season Unit Value
Snow Days day/yr 0.00000
Summer Days day/yr 250.000
5.11. Operational Energy Consumption
5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Gasoline/Service Station 3,109.95 453.209 0.0330 0.0040 13,958.9
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Gasoline/Service Station 53,127.6 0.00000
5.13. Operational Waste Generation
5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Gasoline/Service Station 2.15573 0.00000
42 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
43 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 29.6500 annual days of extreme heat Extreme Precipitation 2.30000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 28.4000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters
44 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 4 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 0 0 N/A
Wildfire 1 0 0 N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
45 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 4 1 1 4
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 1 1 2
Wildfire 1 1 1 2
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
46 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Indicator Result for Project Census Tract
AQ-Ozone 99.0666
AQ-PM 52.1842
AQ-DPM 18.8301
Drinking Water 10.2036
Lead Risk Housing 30.5356
Pesticides 67.3103
Toxic Releases 43.2233
Traffic 9.98750
Effect Indicators —
CleanUp Sites 0.00000
Groundwater 39.4488
Haz Waste Facilities/Generators 40.9265
Impaired Water Bodies 0.00000
Solid Waste 75.6701
Sensitive Population —
Asthma 71.3858
Cardio-vascular 93.1206
Low Birth Weights 79.9076
Socioeconomic Factor Indicators —
Education 63.1992
Housing 55.9569
47 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Indicator Result for Project Census Tract
Linguistic 7.37583
Poverty 51.5704
Unemployment 35.0208
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 63.39022199
Employed 50.78916977
Median HI 78.42935968
Education —
Bachelor's or higher 31.86192737
High school enrollment 14.38470422
Preschool enrollment 9.29038881
Transportation —
Auto Access 94.58488387
Active commuting 22.03259335
Social —
2-parent households 28.65392018
Voting 24.26536635
48 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Indicator Result for Project Census Tract
Neighborhood —
Alcohol availability 63.46721417
Park access 10.16296677
Retail density 10.3554472
Supermarket access 24.07288592
Tree canopy 1.000898242
Housing —
Homeownership 86.56486591
Housing habitability 65.54600282
Low-inc homeowner severe housing cost burden 33.51725908 Low-inc renter severe housing cost burden 30.14243552
Uncrowded housing 57.46182471
Health Outcomes —
Insured adults 61.5167458
Arthritis 43.8
Asthma ER Admissions 30.7
High Blood Pressure 36.7
Cancer (excluding skin) 52.2
Asthma 37.3
Coronary Heart Disease 63.8
Chronic Obstructive Pulmonary Disease 47.8
49 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Indicator Result for Project Census Tract
Diagnosed Diabetes 54.0
Life Expectancy at Birth 24.7
Cognitively Disabled 30.7
Physically Disabled 47.8
Heart Attack ER Admissions 3.5
Mental Health Not Good 42.4
Chronic Kidney Disease 55.3
Obesity 27.8
Pedestrian Injuries 60.6
Physical Health Not Good 48.3
Stroke 58.2
Health Risk Behaviors —
Binge Drinking 25.3
Current Smoker 39.2
No Leisure Time for Physical Activity 47.6
Climate Change Exposures —
Wildfire Risk 0.6
SLR Inundation Area 0.0
Children 58.1
Elderly 61.9
English Speaking 66.7
50 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 Indicator Result for Project Census Tract
Foreign-born 28.7
Outdoor Workers 40.1
Climate Change Adaptive Capacity —
Impervious Surface Cover 87.8
Traffic Density 25.7
Traffic Access 23.0
Other Indices —
Hardship 56.2
Other Decision Support —
2016 Voting 28.4
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 58.0000 Healthy Places Index Score for Project Location (b) 43.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) Yes Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
51 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026 No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
8.1. Justifications
Screen Justification
Land Use Per PD
Construction: Construction Phases Project construction anticipated to begin Oct 2027 Operations: Vehicle Data Per ITE Trip Generation Manual for gasoline/service station
8.3. Land Use
Model Parameter Units Default Value New Value
Lot Area acre 0.01296 0.01000
Building Area sq. ft 565.000 325.000
Landscape Area sq. ft — 0.00000
8.5. Operations
52 / 53
Moreno Valley - Corporate Yard Fueling Station Detailed Report, 9/10/2026
8.5.1. Mobile Sources
8.5.1.1. Vehicle Data
Land Use Model Parameter Units Default Value New Value
Gasoline/Service Station Weekday Trip Rate size/day 172.010 172.000 Gasoline/Service Station Saturday Trip Rate size/day 182.170 172.000 Gasoline/Service Station Sunday Trip Rate size/day 166.880 172.000 Gasoline/Service Station Weekday Primary Trip % 18.7400 100.0000 Gasoline/Service Station Weekday Divert Trip % 31.2600 0.00000 Gasoline/Service Station Weekday Pass-By Trip % 50.0000 0.00000 53 / 53
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Moreno Valley Off-Site Improvements Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated
2.2.2. Onsite Construction Emissions by Year, Unmitigated
2.2.3. Offsite Construction Emissions by Year, Unmitigated
3. Construction Emissions Details
3.1. Linear, Grubbing & Land Clearing (2027)
3.1.1. Onsite - Unmitigated
3.1.2. Offsite - Unmitigated
3.2. Linear, Grading & Excavation (2027)
3.2.1. Onsite - Unmitigated
3.2.2. Offsite - Unmitigated
3.3. Linear, Drainage, Utilities, & Sub-Grade (2027)
1 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026
3.3.1. Onsite - Unmitigated
3.3.2. Offsite - Unmitigated
3.4. Linear, Drainage, Utilities, & Sub-Grade (2028)
3.4.1. Onsite - Unmitigated
3.4.2. Offsite - Unmitigated
3.5. Linear, Paving (2028)
3.5.1. Onsite - Unmitigated
3.5.2. Offsite - Unmitigated
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
2 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
3 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications
8.4. Construction
8.4.6. Trips and VMT
4 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name Moreno Valley Off-Site Improvements
Construction Start Date 10/1/2027
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.50000
Precipitation (days) 24.0000
Location Wilmot St & Brodiaea Ave, Moreno Valley, CA 92555, USA County Riverside-South Coast
City Moreno Valley
Air District South Coast AQMD
Air Basin South Coast
TAZ 5583
EDFZ 11
Electric Utility Moreno Valley Utility
Gas Utility Southern California Gas
App Version 2022.1.1.45
5 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Road Widening 0.45000 Mile 3.79000 0.00000 0.00000 — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 4.15127 3.49425 28.1179 38.3541 0.07104 1.18278 0.59684 1.77963 1.08823 0.12929 1.21753 — 8,170.00 8,170.00 0.31803 0.08864 0.04481 8,204.42 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.53646 0.45123 3.66793 5.01267 0.00925 0.15065 0.08563 0.23628 0.13861 0.01824 0.15684 — 1,058.81 1,058.81 0.04102 0.01204 0.10638 1,063.53 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.09790 0.08235 0.66940 0.91481 0.00169 0.02749 0.01563 0.04312 0.02530 0.00333 0.02862 — 175.299 175.299 0.00679 0.00199 0.01761 176.080
2.2. Construction Emissions by Year
6 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026
2.2.1. Total Construction Emissions by Year, Unmitigated Includes both onsite and offsite emissions.
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2027 4.15127 3.49425 28.1179 38.3541 0.07104 1.18278 0.59684 1.77963 1.08823 0.12929 1.21753 — 8,170.00 8,170.00 0.31803 0.08864 0.04481 8,204.42 2028 2.09864 1.76925 14.4088 20.7910 0.03999 0.52033 0.41355 0.93389 0.47878 0.08885 0.56762 — 4,451.66 4,451.66 0.17119 0.05387 0.02804 4,472.02 Average
Daily
— — — — — — — — — — — — — — — — — —
2027 0.53646 0.45123 3.66793 5.01267 0.00925 0.15065 0.08563 0.23628 0.13861 0.01824 0.15684 — 1,058.81 1,058.81 0.04102 0.01204 0.10638 1,063.53 2028 0.09274 0.07840 0.66113 1.04712 0.00171 0.02307 0.02034 0.04341 0.02123 0.00459 0.02582 — 197.281 197.281 0.00747 0.00266 0.02598 198.287 Annual — — — — — — — — — — — — — — — — — —
2027 0.09790 0.08235 0.66940 0.91481 0.00169 0.02749 0.01563 0.04312 0.02530 0.00333 0.02862 — 175.299 175.299 0.00679 0.00199 0.01761 176.080 2028 0.01693 0.01431 0.12066 0.19110 0.00031 0.00421 0.00371 0.00792 0.00387 0.00084 0.00471 — 32.6620 32.6620 0.00124 0.00044 0.00430 32.8287
2.2.2. Onsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
7 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2027 3.98784 3.35089 27.9061 36.4512 0.07059 1.18188 0.10450 1.27146 1.08733 0.01128 1.09701 — 7,644.02 7,644.02 0.31008 0.06202 0.00000 7,670.26 2028 2.00236 1.67661 14.2497 19.6009 0.03954 0.51943 0.06967 0.58910 0.47788 0.00752 0.48540 — 4,088.39 4,088.39 0.16584 0.03317 0.00000 4,102.42 Average
Daily
— — — — — — — — — — — — — — — — — —
2027 0.51360 0.43122 3.63371 4.73401 0.00917 0.15049 0.01541 0.16589 0.13845 0.00166 0.14011 — 982.361 982.361 0.03985 0.00797 0.00000 985.732 2028 0.08752 0.07339 0.65172 0.97901 0.00168 0.02301 0.00177 0.02478 0.02117 0.00019 0.02136 — 176.669 176.669 0.00717 0.00143 0.00000 177.275 Annual — — — — — — — — — — — — — — — — — —
2027 0.09373 0.07870 0.66315 0.86396 0.00167 0.02746 0.00281 0.03028 0.02527 0.00030 0.02557 — 162.641 162.641 0.00660 0.00132 0.00000 163.199 2028 0.01597 0.01339 0.11894 0.17867 0.00031 0.00420 0.00032 0.00452 0.00386 0.00003 0.00390 — 29.2495 29.2495 0.00119 0.00024 0.00000 29.3499
2.2.3. Offsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2027 0.16343 0.14335 0.21175 1.90286 0.00045 0.00090 0.50727 0.50817 0.00090 0.11962 0.12052 — 525.981 525.981 0.00795 0.02663 0.04481 534.160 2028 0.09628 0.09265 0.15913 1.19009 0.00045 0.00090 0.34389 0.34478 0.00090 0.08132 0.08222 — 363.270 363.270 0.00534 0.02070 0.02804 369.601 Average
Daily
— — — — — — — — — — — — — — — — — —
8 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 2027 0.02287 0.02001 0.03422 0.27866 0.00008 0.00016 0.07022 0.07038 0.00016 0.01657 0.01673 — 76.4517 76.4517 0.00117 0.00407 0.10638 77.7997 2028 0.00522 0.00501 0.00941 0.06811 0.00003 0.00006 0.01856 0.01862 0.00006 0.00439 0.00445 — 20.6120 20.6120 0.00030 0.00123 0.02598 21.0125 Annual — — — — — — — — — — — — — — — — — —
2027 0.00417 0.00365 0.00625 0.05086 0.00001 0.00003 0.01282 0.01284 0.00003 0.00302 0.00305 — 12.6575 12.6575 0.00019 0.00067 0.01761 12.8806 2028 0.00095 0.00091 0.00172 0.01243 0.00001 0.00001 0.00339 0.00340 0.00001 0.00080 0.00081 — 3.41255 3.41255 0.00005 0.00020 0.00430 3.47885
3. Construction Emissions Details
3.1. Linear, Grubbing & Land Clearing (2027)
3.1.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.50946 0.42808 3.80861 4.46942 0.00584 0.18470 — 0.18470 0.16993 — 0.16993 — 632.486 632.486 0.02566 0.00513 — 634.656 9 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Dust
From
Material
Moveme
nt
— — — — — — 0.10450 0.10450 — 0.01128 0.01128 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.01396 0.01173 0.10435 0.12245 0.00016 0.00506 — 0.00506 0.00466 — 0.00466 — 17.3284 17.3284 0.00070 0.00014 — 17.3878 Dust
From
Material
Moveme
nt
— — — — — — 0.00286 0.00286 — 0.00031 0.00031 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00255 0.00214 0.01904 0.02235 0.00003 0.00092 — 0.00092 0.00085 — 0.00085 — 2.86891 2.86891 0.00012 0.00002 — 2.87876 Dust
From
Material
Moveme
nt
— — — — — — 0.00052 0.00052 — 0.00006 0.00006 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - Unmitigated
10 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.03216 0.02844 0.02943 0.37658 0.00000 0.00000 0.09803 0.09803 0.00000 0.02298 0.02298 — 93.3667 93.3667 0.00132 0.00355 0.00818 94.4674 Vendor 0.00263 0.00116 0.06459 0.01997 0.00045 0.00090 0.01711 0.01801 0.00090 0.00473 0.00563 — 59.1478 59.1478 0.00134 0.00885 0.00391 61.8236 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00088 0.00078 0.00089 0.01083 0.00000 0.00000 0.00264 0.00264 0.00000 0.00062 0.00062 — 2.59036 2.59036 0.00004 0.00010 0.00373 2.62402 Vendor 0.00007 0.00003 0.00177 0.00054 0.00001 0.00002 0.00046 0.00049 0.00002 0.00013 0.00015 — 1.61977 1.61977 0.00004 0.00024 0.00178 1.69479 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00016 0.00014 0.00016 0.00198 0.00000 0.00000 0.00048 0.00048 0.00000 0.00011 0.00011 — 0.42886 0.42886 0.00001 0.00002 0.00062 0.43444 Vendor 0.00001 0.00001 0.00032 0.00010 < 0.0000
05 < 0.0000
05 0.00008 0.00009 < 0.0000
05 0.00002 0.00003 — 0.26817 0.26817 0.00001 0.00004 0.00029 0.28059 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2. Linear, Grading & Excavation (2027)
3.2.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 11 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
3.98784 3.35089 27.9061 36.4512 0.07059 1.18188 — 1.18188 1.08733 — 1.08733 — 7,644.02 7,644.02 0.31008 0.06202 — 7,670.26 Dust
From
Material
Moveme
nt
— — — — — — 0.08957 0.08957 — 0.00967 0.00967 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.38240 0.32132 2.67593 3.49532 0.00677 0.11333 — 0.11333 0.10426 — 0.10426 — 732.989 732.989 0.02973 0.00595 — 735.504 Dust
From
Material
Moveme
nt
— — — — — — 0.00859 0.00859 — 0.00093 0.00093 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.06979 0.05864 0.48836 0.63790 0.00124 0.02068 — 0.02068 0.01903 — 0.01903 — 121.355 121.355 0.00492 0.00098 — 121.771 12 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Dust
From
Material
Moveme
nt
— — — — — — 0.00157 0.00157 — 0.00017 0.00017 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.16080 0.14220 0.14716 1.88289 0.00000 0.00000 0.49016 0.49016 0.00000 0.11489 0.11489 — 466.834 466.834 0.00661 0.01777 0.04090 472.337 Vendor 0.00263 0.00116 0.06459 0.01997 0.00045 0.00090 0.01711 0.01801 0.00090 0.00473 0.00563 — 59.1478 59.1478 0.00134 0.00885 0.00391 61.8236 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01542 0.01364 0.01558 0.18951 0.00000 0.00000 0.04628 0.04628 0.00000 0.01084 0.01084 — 45.3313 45.3313 0.00063 0.00170 0.06522 45.9203 Vendor 0.00026 0.00012 0.00618 0.00189 0.00004 0.00009 0.00162 0.00171 0.00009 0.00045 0.00053 — 5.66921 5.66921 0.00013 0.00085 0.00623 5.93176 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00281 0.00249 0.00284 0.03459 0.00000 0.00000 0.00845 0.00845 0.00000 0.00198 0.00198 — 7.50511 7.50511 0.00011 0.00028 0.01080 7.60263 13 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Vendor 0.00005 0.00002 0.00113 0.00034 0.00001 0.00002 0.00030 0.00031 0.00002 0.00008 0.00010 — 0.93860 0.93860 0.00002 0.00014 0.00103 0.98207 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3. Linear, Drainage, Utilities, & Sub-Grade (2027)
3.3.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
2.06595 1.72988 15.0381 19.6689 0.03954 0.56552 — 0.56552 0.52028 — 0.52028 — 4,088.78 4,088.78 0.16586 0.03317 — 4,102.81 Dust
From
Material
Moveme
nt
— — — — — — 0.06967 0.06967 — 0.00752 0.00752 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.11725 0.09817 0.85344 1.11624 0.00224 0.03209 — 0.03209 0.02953 — 0.02953 — 232.044 232.044 0.00941 0.00188 — 232.841 14 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Dust
From
Material
Moveme
nt
— — — — — — 0.00395 0.00395 — 0.00043 0.00043 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.02140 0.01792 0.15575 0.20371 0.00041 0.00586 — 0.00586 0.00539 — 0.00539 — 38.4176 38.4176 0.00156 0.00031 — 38.5494 Dust
From
Material
Moveme
nt
— — — — — — 0.00072 0.00072 — 0.00008 0.00008 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.10720 0.09480 0.09811 1.25526 0.00000 0.00000 0.32677 0.32677 0.00000 0.07660 0.07660 — 311.222 311.222 0.00441 0.01185 0.02727 314.891 Vendor 0.00263 0.00116 0.06459 0.01997 0.00045 0.00090 0.01711 0.01801 0.00090 0.00473 0.00563 — 59.1478 59.1478 0.00134 0.00885 0.00391 61.8236 15 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00608 0.00538 0.00615 0.07477 0.00000 0.00000 0.01826 0.01826 0.00000 0.00428 0.00428 — 17.8858 17.8858 0.00025 0.00067 0.02573 18.1182 Vendor 0.00015 0.00007 0.00366 0.00112 0.00003 0.00005 0.00096 0.00101 0.00005 0.00027 0.00032 — 3.35525 3.35525 0.00008 0.00050 0.00369 3.51063 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00111 0.00098 0.00112 0.01365 0.00000 0.00000 0.00333 0.00333 0.00000 0.00078 0.00078 — 2.96120 2.96120 0.00004 0.00011 0.00426 2.99968 Vendor 0.00003 0.00001 0.00067 0.00020 < 0.0000
05 0.00001 0.00017 0.00018 0.00001 0.00005 0.00006 — 0.55550 0.55550 0.00001 0.00008 0.00061 0.58123 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4. Linear, Drainage, Utilities, & Sub-Grade (2028)
3.4.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
2.00236 1.67661 14.2497 19.6009 0.03954 0.51943 — 0.51943 0.47788 — 0.47788 — 4,088.39 4,088.39 0.16584 0.03317 — 4,102.42 16 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Dust
From
Material
Moveme
nt
— — — — — — 0.06967 0.06967 — 0.00752 0.00752 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.05094 0.04265 0.36252 0.49865 0.00101 0.01321 — 0.01321 0.01216 — 0.01216 — 104.010 104.010 0.00422 0.00084 — 104.367 Dust
From
Material
Moveme
nt
— — — — — — 0.00177 0.00177 — 0.00019 0.00019 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00930 0.00778 0.06616 0.09100 0.00018 0.00241 — 0.00241 0.00222 — 0.00222 — 17.2200 17.2200 0.00070 0.00014 — 17.2791 Dust
From
Material
Moveme
nt
— — — — — — 0.00032 0.00032 — 0.00003 0.00003 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4.2. Offsite - Unmitigated
17 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.09370 0.09149 0.09755 1.17065 0.00000 0.00000 0.32677 0.32677 0.00000 0.07660 0.07660 — 305.460 305.460 0.00441 0.01185 0.02450 309.126 Vendor 0.00258 0.00116 0.06158 0.01944 0.00045 0.00090 0.01711 0.01801 0.00090 0.00473 0.00563 — 57.8104 57.8104 0.00093 0.00885 0.00354 60.4758 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00237 0.00231 0.00248 0.03137 0.00000 0.00000 0.00819 0.00819 0.00000 0.00192 0.00192 — 7.86911 7.86911 0.00011 0.00030 0.01035 7.97210 Vendor 0.00007 0.00003 0.00157 0.00049 0.00001 0.00002 0.00043 0.00045 0.00002 0.00012 0.00014 — 1.47004 1.47004 0.00002 0.00023 0.00150 1.53926 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00043 0.00042 0.00045 0.00572 0.00000 0.00000 0.00149 0.00149 0.00000 0.00035 0.00035 — 1.30282 1.30282 0.00002 0.00005 0.00171 1.31987 Vendor 0.00001 0.00001 0.00029 0.00009 < 0.0000
05 < 0.0000
05 0.00008 0.00008 < 0.0000
05 0.00002 0.00003 — 0.24338 0.24338 < 0.0000
05 0.00004 0.00025 0.25484
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5. Linear, Paving (2028)
3.5.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 18 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.89003 0.74787 7.03728 11.6887 0.01633 0.23836 — 0.23836 0.21929 — 0.21929 — 1,768.03 1,768.03 0.07172 0.01434 — 1,774.09 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.03658 0.03073 0.28920 0.48036 0.00067 0.00980 — 0.00980 0.00901 — 0.00901 — 72.6586 72.6586 0.00295 0.00059 — 72.9080 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00668 0.00561 0.05278 0.08767 0.00012 0.00179 — 0.00179 0.00164 — 0.00164 — 12.0295 12.0295 0.00049 0.00010 — 12.0707 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 19 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06559 0.06404 0.06829 0.81946 0.00000 0.00000 0.22874 0.22874 0.00000 0.05362 0.05362 — 213.822 213.822 0.00309 0.00829 0.01715 216.388 Vendor 0.00258 0.00116 0.06158 0.01944 0.00045 0.00090 0.01711 0.01801 0.00090 0.00473 0.00563 — 57.8104 57.8104 0.00093 0.00885 0.00354 60.4758 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00268 0.00262 0.00281 0.03547 0.00000 0.00000 0.00926 0.00926 0.00000 0.00217 0.00217 — 8.89815 8.89815 0.00013 0.00034 0.01170 9.01460 Vendor 0.00011 0.00005 0.00254 0.00079 0.00002 0.00004 0.00069 0.00073 0.00004 0.00019 0.00023 — 2.37468 2.37468 0.00004 0.00036 0.00243 2.48650 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00049 0.00048 0.00051 0.00647 0.00000 0.00000 0.00169 0.00169 0.00000 0.00040 0.00040 — 1.47319 1.47319 0.00002 0.00006 0.00194 1.49247 Vendor 0.00002 0.00001 0.00046 0.00014 < 0.0000
05 0.00001 0.00013 0.00013 0.00001 0.00004 0.00004 — 0.39316 0.39316 0.00001 0.00006 0.00040 0.41167 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
20 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
21 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
22 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Linear, Grubbing & Land
Clearing
Linear, Grubbing & Land
Clearing
10/1/2027 10/14/2027 5.00000 10.00000 —
Linear, Grading &
Excavation
Linear, Grading &
Excavation
10/15/2027 12/2/2027 5.00000 35.0000 —
23 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Linear, Drainage,
Utilities, & Sub-Grade
Linear, Drainage,
Utilities, & Sub-Grade
12/3/2027 1/13/2028 5.00000 30.0000 —
Linear, Paving Linear, Paving 1/14/2028 2/3/2028 5.00000 15.0000 —
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Linear, Grubbing &
Land Clearing
Signal Boards Electric Average 0.00000 8.00000 6.00000 0.82000 Linear, Grubbing &
Land Clearing
Crawler Tractors Diesel Average 1.000000 8.00000 87.0000 0.43000 Linear, Grubbing &
Land Clearing
Excavators Diesel Average 2.00000 8.00000 36.0000 0.38000 Linear, Grading &
Excavation
Excavators Diesel Average 3.00000 8.00000 36.0000 0.38000 Linear, Grading &
Excavation
Crawler Tractors Diesel Average 1.000000 8.00000 87.0000 0.43000 Linear, Grading &
Excavation
Graders Diesel Average 2.00000 8.00000 148.000 0.41000
Linear, Grading &
Excavation
Rollers Diesel Average 2.00000 8.00000 36.0000 0.38000
Linear, Grading &
Excavation
Signal Boards Electric Average 0.00000 8.00000 6.00000 0.82000 Linear, Grading &
Excavation
Tractors/Loaders/
Backhoes
Diesel Average 4.00000 8.00000 84.0000 0.37000
24 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Linear, Grading &
Excavation
Rubber Tired Loaders Diesel Average 1.000000 8.00000 150.000 0.36000 Linear, Grading &
Excavation
Scrapers Diesel Average 2.00000 8.00000 423.000 0.48000 Linear, Drainage,
Utilities, & Sub-Grade
Scrapers Diesel Average 1.000000 8.00000 423.000 0.48000 Linear, Drainage,
Utilities, & Sub-Grade
Rough Terrain
Forklifts
Diesel Average 1.000000 8.00000 96.0000 0.40000
Linear, Drainage,
Utilities, & Sub-Grade
Tractors/Loaders/
Backhoes
Diesel Average 3.00000 8.00000 84.0000 0.37000
Linear, Drainage,
Utilities, & Sub-Grade
Signal Boards Electric Average 0.00000 8.00000 6.00000 0.82000 Linear, Drainage,
Utilities, & Sub-Grade
Graders Diesel Average 1.000000 8.00000 148.000 0.41000 Linear, Drainage,
Utilities, & Sub-Grade
Plate Compactors Diesel Average 1.000000 8.00000 8.00000 0.43000 Linear, Drainage,
Utilities, & Sub-Grade
Pumps Diesel Average 1.000000 8.00000 11.0000 0.74000
Linear, Drainage,
Utilities, & Sub-Grade
Air Compressors Diesel Average 1.000000 8.00000 37.0000 0.48000 Linear, Drainage,
Utilities, & Sub-Grade
Generator Sets Diesel Average 1.000000 8.00000 14.0000 0.74000 Linear, Paving Rollers Diesel Average 2.00000 8.00000 36.0000 0.38000 Linear, Paving Paving Equipment Diesel Average 1.000000 8.00000 89.0000 0.36000 Linear, Paving Pavers Diesel Average 1.000000 8.00000 81.0000 0.42000 Linear, Paving Tractors/Loaders/
Backhoes
Diesel Average 3.00000 8.00000 84.0000 0.37000
25 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Linear, Paving Signal Boards Electric Average 0.00000 8.00000 6.00000 0.82000
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Linear, Grubbing & Land Clearing Worker 7.50000 18.5000 LDA,LDT1,LDT2 Linear, Grubbing & Land Clearing Vendor 2.00000 10.2000 HHDT,MHDT Linear, Grubbing & Land Clearing Hauling 0.00000 20.0000 HHDT Linear, Grubbing & Land Clearing Onsite truck — — HHDT
Linear, Grading & Excavation Worker 37.5000 18.5000 LDA,LDT1,LDT2 Linear, Grading & Excavation Vendor 2.00000 10.2000 HHDT,MHDT Linear, Grading & Excavation Hauling 0.00000 20.0000 HHDT Linear, Grading & Excavation Onsite truck — — HHDT
Linear, Drainage, Utilities, & SubGradeWorker 25.0000 18.5000 LDA,LDT1,LDT2 Linear, Drainage, Utilities, & SubGradeVendor 2.00000 10.2000 HHDT,MHDT Linear, Drainage, Utilities, & SubGradeHauling 0.00000 20.0000 HHDT Linear, Drainage, Utilities, & SubGradeOnsite truck — — HHDT Linear, Paving Worker 17.5000 18.5000 LDA,LDT1,LDT2
26 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Linear, Paving Vendor 2.00000 10.2000 HHDT,MHDT
Linear, Paving Hauling 0.00000 20.0000 HHDT
Linear, Paving Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Linear, Grubbing & Land
Clearing
— — 3.79000 0.00000 0.00000
Linear, Grading & Excavation — — 3.79000 0.00000 0.00000 Linear, Drainage, Utilities, &
Sub-Grade
— — 3.79000 0.00000 0.00000
5.6.2. Construction Earthmoving Control Strategies
27 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 3 74% 74%
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2027 0.00000 453.209 0.03300 0.00400
2028 0.00000 453.209 0.03300 0.00400
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
28 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 29.6500 annual days of extreme heat Extreme Precipitation 2.30000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 28.4000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters
Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi. 29 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 4 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 0 0 N/A
Wildfire 1 0 0 N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 4 1 1 4
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 1 1 2
Wildfire 1 1 1 2
Flooding N/A N/A N/A N/A
30 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 99.0666
AQ-PM 52.1842
AQ-DPM 18.8301
Drinking Water 10.2036
Lead Risk Housing 30.5356
31 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Indicator Result for Project Census Tract
Pesticides 67.3103
Toxic Releases 43.2233
Traffic 9.98750
Effect Indicators —
CleanUp Sites 0.00000
Groundwater 39.4488
Haz Waste Facilities/Generators 40.9265
Impaired Water Bodies 0.00000
Solid Waste 75.6701
Sensitive Population —
Asthma 71.3858
Cardio-vascular 93.1206
Low Birth Weights 79.9076
Socioeconomic Factor Indicators —
Education 63.1992
Housing 55.9569
Linguistic 7.37583
Poverty 51.5704
Unemployment 35.0208
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state. 32 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Indicator Result for Project Census Tract
Economic —
Above Poverty 63.39022199
Employed 50.78916977
Median HI 78.42935968
Education —
Bachelor's or higher 31.86192737
High school enrollment 14.38470422
Preschool enrollment 9.29038881
Transportation —
Auto Access 94.58488387
Active commuting 22.03259335
Social —
2-parent households 28.65392018
Voting 24.26536635
Neighborhood —
Alcohol availability 63.46721417
Park access 10.16296677
Retail density 10.3554472
Supermarket access 24.07288592
Tree canopy 1.000898242
Housing —
33 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Indicator Result for Project Census Tract
Homeownership 86.56486591
Housing habitability 65.54600282
Low-inc homeowner severe housing cost burden 33.51725908 Low-inc renter severe housing cost burden 30.14243552
Uncrowded housing 57.46182471
Health Outcomes —
Insured adults 61.5167458
Arthritis 43.8
Asthma ER Admissions 30.7
High Blood Pressure 36.7
Cancer (excluding skin) 52.2
Asthma 37.3
Coronary Heart Disease 63.8
Chronic Obstructive Pulmonary Disease 47.8
Diagnosed Diabetes 54.0
Life Expectancy at Birth 24.7
Cognitively Disabled 30.7
Physically Disabled 47.8
Heart Attack ER Admissions 3.5
Mental Health Not Good 42.4
Chronic Kidney Disease 55.3
34 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Indicator Result for Project Census Tract
Obesity 27.8
Pedestrian Injuries 60.6
Physical Health Not Good 48.3
Stroke 58.2
Health Risk Behaviors —
Binge Drinking 25.3
Current Smoker 39.2
No Leisure Time for Physical Activity 47.6
Climate Change Exposures —
Wildfire Risk 0.6
SLR Inundation Area 0.0
Children 58.1
Elderly 61.9
English Speaking 66.7
Foreign-born 28.7
Outdoor Workers 40.1
Climate Change Adaptive Capacity —
Impervious Surface Cover 87.8
Traffic Density 25.7
Traffic Access 23.0
Other Indices —
35 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026 Indicator Result for Project Census Tract
Hardship 56.2
Other Decision Support —
2016 Voting 28.4
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 58.0000 Healthy Places Index Score for Project Location (b) 43.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) Yes Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
36 / 37
Moreno Valley Off-Site Improvements Detailed Report, 9/10/2026
8. User Changes to Default Data
8.1. Justifications
Screen Justification
Construction: Trips and VMT Additional vendor trips added to account for material delivery and removal
8.4. Construction
8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New Value Linear, Grubbing & Land Clearing Vendor One-Way Trips per Day 0.00000 2.00000 Linear, Grading & Excavation Vendor One-Way Trips per Day 1.000000 2.00000 Linear, Drainage, Utilities, & SubGradeVendor One-Way Trips per Day 0.00000 2.00000 Linear, Paving Vendor One-Way Trips per Day 0.00000 2.00000 37 / 37
Emergency Backup Generator Emissions
Equipment Fuel Type Quantity HP LF
Hours per Year
per Unit
Hours per
Day
HP-hr per
Day
Total hp-hr
per Year
Backup Generator Diesel 1 200 0.74 50 8 1,184 7,400
ROG CO NOX SO2 PM10 PM2.5 CO2 CH4 N2O CO2e
Emissions Rates (g/hp-hr) 1.020 2.600 2.850 0.005 0.150 0.150 521.640 0.021 0.004 - Emissions (pounds/day) 2.66 6.79 7.44 0.01 0.39 0.39 1361.62 0.05 0.01 1,366 Emissions (tons/year) 0.01 0.02 0.02 0.00 0.001 0.00 4.26 0.00 0.00 4.27 Source: User Guide for CalEEMod Version 2022.1, Appendix G, Table G-40.
Emergency Backup Generator Emissions
Equipment Fuel Type Quantity HP LF
Hours per Year
per Unit
Hours per
Day
HP-hr per
Day
Total hp-hr
per Year
Backup Generator Diesel 4 200 0.74 50 8 4,736 29,600
ROG CO NOX SO2 PM10 PM2.5 CO2 CH4 N2O CO2e
Emissions Rates (g/hp-hr) 1.020 2.600 2.850 0.005 0.150 0.150 521.640 0.021 0.004 - Emissions (pounds/day) 10.65 27.15 29.76 0.05 1.57 1.57 5446.49 0.22 0.04 5,464 Emissions (tons/year) 0.03 0.08 0.09 0.00 0.005 0.00 17.02 0.00 0.00 17.08 Source: User Guide for CalEEMod Version 2022.1, Appendix G, Table G-40.
Appendix B
CAP Checklist
APPLICATION SUBMITTAL REQUIREMENTS
Definitions
Major Renovations - Qualifying major renovations include any repair, reconstruction, rehabilitation, alteration, addition or other improvement of a building or structure where either:
This CEQA GHG Compliance Checklist is required to accompany the Application Materials submitted to the City for all projects and plans subject to CEQA review that are not deemed statutorily or categorically exempt. The CEQA GHG Checklist is designed to assist the applicant and the City in identifying the minimum CAP and other applicable climate-focused requirements specific to a proposed project or plan. However, it may be necessary to supplement the completed CEQA GHG Checklist with supporting information, materials, calculations, or certifications to demonstrate compliance with CAP and other applicable climate-focused requirements. If the minimum CAP and other applicable climate-focused requirements are not already clearly committed to as part of the CEQA project description, the completed CEQA GHG Checklist shall be included in the respective project or plan description and referenced in the respective conditions of approval.
Dual Plumbing- A "Dual plumbed system" or "dual plumbing" means a system that utilizes separate piping systems for recycled water and potable water within a facility and where the recycled water is used for landscape irrigation and plumbing outlets (e.g., toilets, urinals) within a building.Graywater Ready- Is a system that collects water from graywater sources (clothes washers, showers, lavatory faucets, etc.) separately from blackwater sources (i.e. toilets, kitchen faucets, and dishwashers). Graywater can then be utilized to supply water for landscaping irrigation and toilets.
Major Transit Stop- Major Transit Stop is defined by Assembly Bill (AB) 2553 (2024) as a rail or bus rapid transit station, a ferry terminal served by bus or rail, or the intersection of two or more major bus routes with a frequency of service of 20 minutes or less during peak commute periods.
All Project Types- “All Project Types” refers to all new developments or major renovations/remodels for residential, mixed-use, commercial, and institutional land uses ndustrial projects and emissions generated by those sources are regulated by CARB and are not under the City’s direct operational control. Therefore, this checklist does not apply to industrial projects. 1) The cost of the renovation equals or exceeds 50 percent of the market value of the structure before the improvement or repair is started, or; 2) The square footage of the renovation exceeds 50 percent of the square footage of the structure before the improvement or repair is started.
APPLICATION SUBMITTAL REQUIREMENTS
This CEQA GHG Compliance Checklist is required to accompany the Application Materials submitted to the City for all projects and plans subject to CEQA review that are not deemedstatutorily or categorically exempt. The CEQA GHG Checklist is designed to assist the applicant and the City in identifying the minimum CAP and other applicable climate-focused requirements specific to a proposed project or plan. However, it may be necessary to supplement the completed CEQA GHG Checklist with supporting information, materials, calculations, or certifications to demonstrate compliance with CAP and other applicable climate-focused requirements. If the minimum CAP and other applicable climate-focused requirements are not already clearly committed to as part of the CEQA project description, the completed CEQA GHG Checklist shall be included in the respective project or plan description and referenced in the respective conditions of approval.
Definitions
All Project Types- “All Project Types” refers to all new developments or major renovations/remodels for residential, mixed-use, commercial, and institutional land uses.
Industrial projects and emissions generated by those sources are regulated by CARB and are not under the City’s direct operational control. Therefore, this checklist does not apply to industrial projects.
Dual Plumbing- A "Dual plumbed system" or "dual plumbing" means a system that utilizes separate piping systems for recycled water and potable water within a facility and where the recycled water is used for landscape irrigation and plumbing outlets (e.g., toilets, urinals) within a building.
Graywater Ready- Is a system that collects water from graywater sources (clothes washers, showers, lavatory faucets, etc.) separately from blackwater sources (i.e. toilets, kitchen faucets, and dishwashers). Graywater can then be utilized to supply water for landscaping irrigation and toilets.
Major Renovations - Qualifying major renovations include any repair, reconstruction, rehabilitation, alteration, addition or other improvement of a building or structure where either:
1) The cost of the renovation equals or exceeds 50 percent of the market value of the structure before the improvement or repair is started, or; 2) The square footage of the renovation exceeds 50 percent of the square footage of the structure before the improvement or repair is started.
Major Transit Stop- Major Transit Stop is defined by Assembly Bill (AB) 2553 (2024) as a rail or bus rapid transit station, a ferry terminal served by bus or rail, or the intersection of two or more major bus routes with a frequency of service of 20 minutes or less during peak commute periods.
Public Safety Campus
478-110-001, -002, -003, 004, 005, 006, -007, 478-120-001, -002, -005, -006, and 481-322-044, 291-650-017,260-460-009, 488-330-001, 485-042-029, 308-030-018, and 487-370-0187, -008, -017, -018, -025, and -027 City of Moreno Valley
213-394-0379
Kimley-Horn and Associates, Inc.
Heidi Rous
660 South Figueroa Street, Suite 2100, Los Angeles, CA 90017 [email protected] Redlands Boulevard and Brodiaea Avenue, 25180 Santiago Drive, and existing Civic Center Buildings
60.37 Public Safety Campus (235,000 sf), corporate yard (43,560 sf), and existing civic center uses (145,926 sf ) Angelica Frausto-Lupo
14177 Frederick St. Moreno Valley,CA
(951) 413.3215
[email protected]
GENERAL PROJECT INFORMATION
Project or Plan Name:
Address:
Assessor’s Parcel Number(s):
Date Submitted:
Applicant Name: Contact Phone:
Company Name (if applicable):
Contact Email:
Company Address:
Non
Consultant Name: Contact Phone:Company Name:
Contact Email:
Company Address:
Gross:
Net:
If proposing a Major Renovation:
Square-footage of renovation:Square-footage of existing development:
Cost of renovation: □ Residential (indicate # of single-family dwelling units): □ Residential (indicate # of multi-family dwelling units): □ Commercial (indicate total square footage, gross and net):
Municipal (indicate total square footage, gross and net):
□ Other (describe):
Was a consultant retained to complete this checklist? YesX If Yes, complete the following:Market value of existing development:
Identify all applicable proposed land uses:
Project Information (description summary)
What is the size of the project site or plan area (acres)? GENERAL PROJECT INFORMATION Project or Plan Name: Address: Assessor’s Parcel Number(s): Date Submitted: Applicant Name: Contact Phone: Company Name (if applicable): Contact Email: Company Address: Was a consultant retained to complete this checklist? YesX No[] If Yes, complete the following: Consultant Name: Contact Phone:
Company Name:
Contact Email:
Company Address:
Project Information (description summary)
What is the size of the project site or plan area (acres)? Gross:
Net:
If proposing a Major Renovation:
Square-footage of renovation:
Square-footage of existing development:
Cost of renovation:
Market value of existing development:
Identify all applicable proposed land uses:
[1 Residential (indicate # of single-family dwelling units):[I Residential (indicate # of multi-family dwelling units):
[1 Commercial (indicate total square footage, gross and net):
> Municipal (indicate total square footage, gross and net):
[I Other (describe):
The City of Moreno Valley (City) proposes to implement the Public Safety Campus Project (Project), which consists of three primary components: (1) development of a Public Safety Campus (PSC); (2) construction of a Corporate Yard Fueling Station; and (3) tenant improvements at existing civic center facilities throughout the City. All three components together comprise the Project. The Project also includes improvements to a drainage culvert and roadway improvements on nearby streets. These improvements would accommodate a range of civic uses identified in the City’s Capital Improvement Plan (CIP) and are intended to enhance emergency response capabilities, improve operational efficiency, and support the City’s growing public safety and municipal service needs as the City continues to grow. The Project would encompass approximately 60.37 acres.
Project description. This description shall be consistent with the project description that will be used for the CEQA document. The description may be attached to the GHG Checklist if there are space constraints. Project description. This description shall be consistent with the project description that will be used for the CEQA document. The description may be attached to the GHG Checklist if there are space constraints.
Page
6 of 12
COMPLIANCE CHECKLIST TABLE
Section 1: LAND USE CONSISTENCY
Regulation Requirements Project/Plan Required Explanation4 Compliance
Yes□
Moreno Valley 2024 1 a. Does the Project/Plan include a No8 General Plan Update General Plan Amendment?
N/AD
1 b. Does the Project/Plan include a Zoning
Map Amendment/Rezoning, and/or Zoning
Text Amendment?
If "No" for questions 1a. and 1b., proceed
to Section 2: CAP Measures Consistency. Yes□
Moreno Valley Zoning If "Yes" to either question 1 a or 1.b, the No8
Code applicant shall prepare a Project/Planspecific analysis of GHG emissions, NIA□ including quantification of existing and projected GHG emissions compared to
Moreno Valley CEQA GHG Emissions
Thresholds and incorporation of the CAP
measures in this CEQA GHG Checklist to
the extent feasible.
4 Every question included in this CEQA GHG Checklist is required to be answered with explanation of either: 1) how it will be achieved, 2) why it will not be achieved, or 3) why it is not applicable. References to the plan set page number or other project description detail should be provided to demonstrate compliance.
The Project would be permitted under
existing land use designation and a
General Plan Amendment would not
be required.
The Project would be permitted
under the existing land use
designation and a zone change
would not be required.
The Project would be designed in
accordance with the 2025
CALGreen Code.
The Project would be designed in
accordance with applicable 2025
CALGreen Code Standards.
Therefore, the Project will provide
electric ready applicances in
accordance with the California
Electric Code.
The Project would be designed in
accordance with applicable 2025
CALGreen Code Standards.
Therefore, the Project would
include electric ready appliances in
accordance with the California
Electric Code.
Measure No. Requirements Required Explanation
Building Energy
Building Decarbonization and Energy Efficiency
YesX
Non
N/AD
YesX
Non
N/AH
YesX
Non
N/AH
7 As of the date of this current CEQA GHG Checklist, the 2022 CALGreen Code is in effect. Beginning January 1, 2026, the 2025 CALGreen Code will apply. For more information
Project/Plan
Compliance5
2. All Project Types - Energy-Efficient Design. Will the Project/Plan comply with the latest version of the Building Energy Efficiency Standards (Title 24, Part 6),6 CALGreen Code,7 and any applicable Moreno Valley Building Energy Appliance Reach Codes or Energy Score Ordinances?
visit: https://www.dgs.ca.gov/BSC/CALGreen.
8 A “Yes” to this checklist item means that all heating, cooking, and water heating appliances are electrified.
Measures BE-2
and BE-3
4.AII Project Types - Building Decarbonization. Will the Project/Plan include decarbonized new construction and
applicable major renovations, including for heating, cooking, and water heating?8
3.AII Project Types - Energy-Efficient Air Conditioning. As an option, will the Project/Plan include central air conditioning unit installations and replacements that are two-way, providing both heating and cooling with a single unit?
Measures BE-4,
and BE-5
Measures BE-2,
BE-3, BE-4, and
BE-5
5 “No” responses to checklist items, except for those that include “as an option” in the language, indicate that a quantitative GHG emissions analysis shall be required for the Plan/Project. Checklist items that include “as an option” in the language are voluntary in nature. 6 As of the date of this current CEQA GHG Checklist, the 2022 Building Energy Efficiency Standards are in effect. Beginning January 1,2026, the 2025 Building Energy Efficiency Standards will apply. For more information visit: https://www.energy.ca.gov/programs-and-topics/programs/building-energy-efficiency-standards.
Section 2: CAP MEASURES CONSISTENCY
Project/Plan
Compliance? Measure No. Requirements Required Explanation Building Decarbonization andEnergyEfficiency
2. All Project Types —Energy-Efficient Design. Will the YesX Measures BE-2, | Project/Plan comply with the latest version of the Building BE-3, BE-4, and | Energy Efficiency Standards (Title 24, Part 6),6 CALGreen NoO BE-5 Code,” and any applicable Moreno Valley Building Energy N/A] Appliance Reach Codes or Energy Score Ordinances?
3.All Project Types —Energy-Efficient Air Conditioning. As Yes Measures BE-4, | an option, will the Project/Plan include central air conditioning NoLl and BE-5 unit installations and replacements that are two-way, providing both heating and cooling with a single unit? N/AC]
4.All Proj ildi izati Yes . roject Types —Building Decarbonization. Will the MeasuresBE-2 | Project/Plan includedecarbonizednewconstructionand Noll and BE-3 applicable major renovations, including for heating, cooking, and water heating? N/AC]
9 “Ng” responses to checklist items, except for those that include “as an option” in the language, indicate that a quantitative GHG emissions analysis shall be required for the Plan/Project. Checklist items that include “as an option” in the language are voluntary in nature. 6 As of the date of this current CEQA GHG Checklist, the 2022 Building Energy Efficiency Standards are in effect. Beginning January 1, 2026, the 2025 Building Energy Efficiency Standards will apply. For more information visit: https://www.energy.ca.gov/programs-and-topics/programs/building-energy-efficiency-standards. 7 As of the date of this current CEQA GHG Checklist, the 2022 CALGreen Code is in effect. Beginning January 1, 2026, the 2025 CALGreen Code will apply. For more information visit: https://www.dgs.ca.gov/BSC/CALGreen.
8 A “Yes” to this checklist item means that all heating, cooking, and water heating appliances are electrified.
Renewable Energy
5. All Project Types - Solar and Battery Storage Yes8 Requirements. As applicable, will the Project/Plan include Measure BE-6 installation of a solar photovoltaic (PV) and battery storage No□ system in accordance with the requirements of the current version of Building Energy Efficiency Standards (Title 24, Part NIA□ 6)?9
Yes□
6. Nonresidential Projects - As an option, will the
Measure BE-6 Project/Plan install solar PV on at least 50 percent of usable No□ roof space and install battery storage? N/AD
Transportation
Multi-Modal Transportation
7. All Project Types - Bicycle Parking. Will the Project/Plan Yes□ Measure T-1 comply with the latest version of the Moreno Valley Municipal No□ Code Section 9.11.06010 or CALGreen Code,11 whichever has the greater requirement, for provision of bicycle parking? NIA□
8. All Project Types - Parking Requirements. If located Yes□ Measure T-2 within O.5-mile of a Major Transit Stop, would the Plan/Project No8 implement reduced parking consistent with AB 2097 (2022)12 and AB 2553 (2024 )?13 NIA□
9 As of the date of this current CEQA GHG Checklist, the 2022 Building Energy Efficiency Standards are in effect. Beginning January 1, 2026, the 2025 Building Energy Efficiency Standards will apply. Available at: https://www.energy.ca.gov/programs-and-topics/programs/building-energy-efficiency-standards. 10 Available at: https://ecode360.com/43230888#43230943 11 Available at: https://www.dgs.ca.gov/bsc/calgreen
12 Available at: https://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=202120220AB2097 13 Available at: https://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=202320240AB2553
The Project would incorporate solar
PV throughout Project covered
parking areas in accordance with
Title 24, Part 6.
The Project is not located within a
0.5-mile of a Major Transit Stop.
The Project would provide 862 parking
spaces; therefore, the Project would
provide 43 bicycle parking spaces.
X
CALGreen Tier 2 requirements for nonresidential projects require 50 percent of parking spaces to be EV capable.
Therefore, the Project would provide
431 EV charging spaces.
The Project would utilize electric or lowemission off-road equipment during Project Construction.
The Project will comply with applicable
federal, State, and local recycling
waste diversion requirements during
Project construction and operations.
Vehicle and Off-road Equipment Decarbonization
YesX
Measure T-4 NoD
N/AD
YesR
Measure T-5 NoD
N/AD
Solid Waste
YesR
Measure SW-1 NoD
N/AD
14 Available at: https://www.dgs.ca.gov/bsc/calgreen
15 Available at: https://ecode360.com/43225954
9. All Project Types - Electric Vehicle Chargers. Will the Project/Plan comply with the CALGreen14 Tier 2 requirements for electric vehicle (EV) charging parking spaces?
10. All Project Types - Off-Road Equipment
Decarbonization. Will the Project/Plan include the use of zeroemission (e.g., electric, renewable diesel) off-road construction and landscaping equipment (e.g., mowers, chippers, tractors)?
11. All Project Types - Landfill Diversion. Will the
Project/Plan meet current legislation (e.g., California SB 1383 [2016], AB 1276 [2021]) and Moreno Valley Municipal Code Chapters 6.02 and 6.0315 requirements for inclusion of solid waste sorting and disposal receptacles to support the CAP and Statewide goals to sort, recycle, and collect recyclables and reduce landfilled garbage?
Vehicle andOff-roadEquipment Decarbonization
Yes
9. All Project Types —Electric Vehicle Chargers. Will the Measure T-4 Project/Plan comply with the CALGreen'4 Tier 2 requirements No[l for electric vehicle (EV) charging parking spaces? N/A]
10. All Project Types —Off-Road Equipment Yeskd
MeasureT-5 Decarbonization. WilltheProject/Planinclude the useof zero- Noll emission (e.g., electric, renewable diesel) off-road construction and landscaping equipment (e.g., mowers, chippers, tractors)? N/AO
11. All Project Types —Landfill Diversion. Will the
Project/Plan meet current legislation (e.g., California SB 1383 Yesk [2016], AB 1276 [2021]) and Moreno Valley Municipal Code Measure SW-1 | Chapters 6.02 and 6.033 requirements for inclusion of solid No[l waste sorting and disposal receptacles to support the CAP and N/AC Statewide goals to sort, recycle, and collect recyclables and reduce landfilled garbage?
14Available at: https://www.dgs.ca.gov/bsc/calgreen
15Availableat:https://ecode360.com/43225954
Page10 of 12
The Project will submit a Waste
Management Plan to achieve a 65 percent
diversion for construction waste in
accordance with CALGreen Requirements.
The Project will meet or exceed applicable
CALGreen water efficiency standards
through the installation of water-efficient
fixtures, fittings, and landscaping measures
In accordance with the Moreno Valley
Municipal Code Chapter 9.17,
landscaped ares will utilize native or lowwater use plant materials, smart irrigation systems, and drought-tolerant design.
In accordance with State Legislation
and Moreno Valley Municipal Code
Requirements, the Project would
provide waste disposal and signage
to support waste diversion.
YesR
Measure SW-1 NoD
N/AL
YesX
Measure SW-1 NoD
N/AL
Water Use
YesR
Measure WW-1 NoD
N/AD
YesX
Measure WW-1 NoD
N/AL
YesD
Measure WW-1 NoD
N/AR
16 Available at: https://calrecycle.ca.gov/organics/slcp/ 17 Available at: https://ecode360.com/43225954
18 Available at: https://www.dgs.ca.gov/bsc/calgreen
19 Available at: https://ecode360.com/43233174
15. All Project Types - Water Efficient Landscaping. Will the Project/Plan comply with the requirements of Moreno Valley Municipal Code Chapter 9.1719 by including water efficient landscaping and landscaping irrigation systems?
13. All Project Types - Construction and Demolition Debris Recycling. Will the Project/Plan achieve a 65 percent diversion from landfill rate for construction waste in accordance with CALGreen requirements?
12. All Project Types - Organics Recycling Requirement.
Will the Project/Plan meet SB 1383 (2016)16 legislation and Moreno Valley Municipal Code Chapters 6.02 and 6.0317
requirements by requiring that residences and businesses provide organic waste disposal containers and post educational signage to encourage Project/Plan occupants to sort, compost, and collect organic waste to support the goal of achieving a 75 percent reduction of landfilled organic waste compared to 2014 levels?
14. All Project Types - Water Conservation. Will the
Project/Plan meet the water-efficiency standards established by the latest version of the CALGreen18 code by including water efficient fixtures and appliances?
16. All Project Types - Dual Plumbing. As an option, will the Project/Plan include development that is built with dual plumbing or graywater ready plumbing that can utilize recycled water or graywater for landscape watering and toilets?
12. All Project Types —Organics Recycling Requirement.
Will the Project/Plan meet SB 1383 (2016)16 legislation and Moreno Valley Municipal Code Chapters 6.02 and 6.0317 Yes requirements by requiring that residences and businesses Measure SW-1 | provide organic waste disposal containers and post educational No[] signage to encourage Project/Plan occupants to sort, compost, N/A and collect organic waste to support the goal of achieving a 75 percent reduction of landfilled organic waste compared to 2014 levels?
13. All Proi . coc . YesX
. roject Types —Construction and Demolition Debris
Recycling. Will the Project/Plan achieve a 65 percent diversion Measure SW-1 from landfill rate for construction waste in accordance with Nol CALGreen requirements? N/AO
14. All Project Types —Water Conservation. Will the Yes Measure WW-1 Project/Plan meet the water-efficiency standards established Nol] by the latest version of the CALGreen8 code by including ° water efficient fixtures and appliances? N/ACT . I . . YesX 15. All Project Types —Water Efficient Landscaping. Will : the Project/Plan comply with the requirements of Moreno Noll Measure WW-1 Valley Municipal Code Chapter 9.1719 by including water efficient landscaping and landscaping irrigation systems? N/AO . . . . Yes 16. All Project Types —Dual Plumbing. As an option, will the Measure WW-1 Project/Plan include development that is built with dual Nod plumbing or graywater ready plumbing that can utilize recycled water or graywater for landscape watering and toilets? N/AK 16 Available at: https://calrecycle.ca.gov/organics/slcp/ 17 Available at: https://ecode360.com/43225954
18Availableat: https://www.dgs.ca.gov/bsc/calgreen
19 Available at: https:/ecode360.com/43233174
Page11of 12
Pursuant to Municipal Code Chapter
9.17, the Project would utilize drought
tolerant landscaping.
Mayra Garcia
Mayra Garcia
September 29, 2026
Urban Forest
YesR
Measure CS-2 Non
N/AL
YesX
Final Consistency Determination NoC
Signature(s)
Checklist Prepared by:
(Name)
Checklist Prepared by:
(Signature)
Checklist Prepared on:
(Date)
20 Signatures for the checklist preparer and/or Project/Plan applicant/proponent should be added below to indicate that this checklist has been filled out accurately and the Project/Plan has committed to including the Checklist Items above marked with “Yes” in the Project/Plan design.
Does the Project/Plan incorporate all applicable and nonoptional checklist items? If no, Project/Plan requires quantitative GHG emissions assessment.
17. All Project Types - Tree Planting. Will the Project/Plan include new climate-adaptive/drought tolerant trees and landscaping20 (as applicable) in order to increase the Citywide urban forest?
Refer to the California Native Plant Society’s Planting Guide for Riverside County for examples: https://www.bewaterwise.com/assets/mwd_plantguide-screen_riverside_4.16.pdf.
17. All Project Types —Tree Planting. Will the Project/Plan MeasureCS-2 | includenewclimate-adaptive/drought tolerant trees and Noll landscaping?? (as applicable) in order to increase the Citywide urban forest?
Yesk
N/AO
Section 3: Summary and Signature
Final Consistency Determination
Does the Project/Plan incorporate all applicable and non- Yes optional checklist items? If no, Project/Plan requires Noll quantitative GHG emissions assessment. °
Signature(s)
Checklist Items above marked with “Yes” in the Project/Plan design.
Signatures for the checklist preparer and/or Project/Plan applicant/proponent should be added below to indicate that this checklist has been filled out accurately and the Project/Plan has committed to including the Checklist Prepared by:
Checklist Prepared by:
(Name)
Checklist Prepared on:
(Signature)
(Date)
20 Refer to the California Native Plant Society's Planting Guide for Riverside County for examples: https://www.bewaterwise.com/assets/mwd_plantguide-screen_riverside_4.16.pdf.