MEMORANDUM
Planning Division, Community Development Department
DATE:

TO:

March 28, 2022
California Office of Planning and Research (OPR)
FROM: Brittany Whitehill, Associate Planner, Community Development Department
SUBJECT: City of Mountain View 2021 General Plan Annual Progress Report

INTRODUCTION
The City of Mountain View Planning Division is pleased to submit the 2021 General Plan Annual Progress Report to the California Office of Planning and Research. The Mountain View 2030 General Plan was adopted by the City Council on July 10, 2012.

This year, the General Plan Annual Progress report was reviewed by the EPC on March 2, 2021 and City Council on March 22, 2021. The Housing Element Annual Progress Report was brought to City Council as a separate item on March 22, 2021.
2021 GENERAL PLAN ANNUAL PROGRESS REPORT
Three tables of General Plan action items are attached to this memo. Table 1 includes items which have not started, are currently in progress, or were completed during 2021 (Attachment 1 to this memo). Table 2 includes items that were completed prior to 2021 (Attachment 2 to this memo).

Table 3 includes items which are achieved through day-to- day operations, practices, and policies (Attachment 3). Since last year’s 2021 General Plan action item update, several items have been completed:
• Adoption of new park land dedication standards to allow publicly accessible, privately owned park land with developments (POS 1.2.1 —Update Zoning Ordinance open space requirements).
• Creation of the North Bayshore District Sustainability Performance Monitoring webpage. • Conversion of City streetlights and parking lot lights to LEDs (INC 13.1.2 —Efficient City infrastructure—Reclassified to “Ongoing”).
• Tracking of building permits finaled for renewable energy projects (INC 14.1.1 —Track new renewable energy installations—Reclassified to “Ongoing”).

Attachment 1
GENERAL PLAN AMENDMENTS APPROVED OR UNDER REVIEW IN 2021 During 2021, the following General Plan Amendments were either approved were under review:
• Minor General Plan Amendments: To improve clarity of densities and intensities of land use designations. (Text amendment approved April 4, 2021).
• Gateway Master Plan: City-initiated Master Plan for the Gateway site in the North Bayshore Area near US 101 freeway and North Shoreline Boulevard. The project also includes a General Plan Amendment for the property located at 1555 Plymouth Street to change the property's General Plan Land Use Designation from High Intensity Office to Mixed-Use Center (North Bayshore). (Master Plan and map amendment approved December 7, 2021) • 901-987 N Rengstorff Ave: From General Industrial and Medium-Density Residential to High- Density Residential. (Map amendment under review).
• 555 W Middlefield Road : From Medium-Density Residential to High-Low- Density Residential. (Map and text amendment under review).
• 601-649 Escuela Ave & 1873 Latham Street: From Medium-Density Residential to Mixed-Use Corridor. (Map amendment under review).
• 1265 Montecito Ave: From Neighborhood Commercial to High-Density Residential. (Map amendment under review).
• 1020 Terra Bella Ave: From General Industrial to High-Density Residential. (Map amendment under review).
• R3 Update: Update of the R 3 (Multiple-Family Residential) zoning district standards and corresponding General Plan land use designations to consider incorporating form-based development standards. (Map and text amendment under review). • Housing Element Update: The Housing Element Update includes reviewing and updating City housing policies to accommodate a share of the region’s projected housing needs, which is determined in the Regional Housing Needs Assessment (RHNA) set by the State Department of Housing and Community Development (HCD). (map and text amendment under review) MAJOR DEVELOPMENT PROJECTS APPROVED OR UNDER REVIEW IN 2021 The Planning Division prepares bi-monthly updates of private development projects and long range planning studies currently underway. Some major development projects that were either approved or under review in 2021 are listed below:

Attachment 1
• 400 Logue Ave: Planned Community Permit and Development Review Permit for an 8-story, 407-unit residential development, a 36,000 square foot Transfer of Development Rights, and Heritage Tree Removal Permit to remove five Heritage trees on a 2.54-acre project site. (Approved by City Council on June 6, 2021)
• 1100 La Avenida Street: Steamlined Ministerial Approval pursuant to SB 35 to construct a 4- story apartment building with 100 affordable units and associated landscape improvements, including a 96% State Density Bonus with development waivers, and the removal of 17 Heritage trees, replacing an existing single -story office building on a 0.96-acre site. (Approved ministerially on July 2, 2021).
• 1919 Gamel Way: Request for a Planned Unit Development Permit and Development Review Permit to construct a four-story, 121-unit residential condominium development with underground parking and a 50% State Density Bonus with waivers from development standards to replace 29 rental units and Heritage Tree Removal Permit to remove 12 Heritage trees on a 2.3-acre project site. (Approved by City Council on September 28, 2021). • Lot 12: Streamlined Ministerial Approval pursuant to SB 35 to construct 120 affordable housing units and 3,714 square feet of ground floor commercial to replace a City-owned public parking lot with 160 parking spaces on a 1.5-acre site. (Under review). • 870 E El Camino Real: Planned Community Permit and Development Review Permit to construct two, 6-story buildings with 233 new apartment units with one level of underground parking with a State Density Bonus with development waivers, and site and façade improvements to existing apartment buildings to remain, replacing three apartment buildings with 42 existing units, resulting in a total of 371 units on site; a Provisional Use Permit to allow rooftop amenities above the third floor; a Heritage Tree Removal Permit to remove 14 Heritage trees on a 9.15-acre site. (Under review). • 320 Logue Ave: Planned Community Permit and Development Review Pe rmit to construct a 7-story, 363-unit residential development with underground parking, replacing a 30,750 sq. ft. existing office building, on 2.15-acre site. (Under review). • Google Middlefield Park Master Plan: Master Plan to allow up to 1,900 residential units (with 20 percent affordable), up to 1.3 million square feet of office (654,000 net new square feet), approximately 12 acres of public open space, 30,000 square feet of ground-floor retail, restaurant and service uses, 20,000 square feet of community space, new private streets, pedestrian and bike improvements, and a private district utility system, replacing multiple one- to four-story office and industrial buildings, on a 40-acre project site. (Under review) • Google North Bayshore Master Plan: Master Plan to allow up to 7,000 residential units, 1.3 million square feet of office, 25.5 acres of public parks, 265,000 square feet of ground-floor retail, restaurant and services, new private streets, new pedestrian and bike improvements, Attachment 1
replacing multiple one to four-story office and industrial buildings, on a 122-acre project site. (Under review)
• 365-405 San Antonio Road and 2585-2595 California Street: Precise Plan Amendment to allow an approximately 182,000 square foot office project with 150,000 square feet of development rights; a Planned Community Permit and Development Review Permit to construct an approximately 182,000 square foot office building with ground floor retail and four le vels of underground parking connected to the adjacent development site; a Provisional Use Permit to allow a shared parking reduction between the proposed project and the adjacent development site, and a Heritage Tree Removal Permit to remove five Heritage Trees, replacing two small commercial building and a surface parking lot on a 0.99- acre site. (Under review)
• 590 Castro Street: Planned Community Permit and Development Review Permit to construct a 4- story, 106,000 square foot office building with a plaza; a Provisional Use Permit for a parking reduction of 277 spaces, in lieu of the required 316 spaces; and a Heritage Tree Removal Permit to remove 9 Heritage trees on a 0.95-acre site. (Under review) • 301 East Evelyn Avenue Planned Community Permit and Development Review Permit for a 3-story, 125,000 square foot office building and a 6 -level parking structure at an existing office campus with four other existing buildings to remain with Transfer of Development Rights of additional office square footage from the Los Altos School District TDR Program; and a Heritage Tree Removal Permit to remove 32 Heritage trees on a 16.6-acre project site. (Under review)

CONCLUSION
The City of Mountain View Planning Division thanks the OPR for the opportunity to submit the 2021 General Plan Annual Progress Report. For questions, please contact Brittany Whitehill, Associate Planner at [email protected].

Exhibits:

A. Table 1—Outstanding and Recently Completed Items
B. Table 2—Items Completed Prior to 2021
C. Table 3—Ongoing and Day-to-Day
Exhibit A

ACTION ITEMS RESPONSIBLE /LEAD

DEPARTMENT

SUPPORT
DEPARTMENT PRIORITIZATION STATUS 2021

IMPLEMENTATION
TIMING (since action plan
adoption in 2013)

NEW ANTICIPATED

IMPLEMENTATION
TIMING (from 2021)
COMMENTS 2021
Plannin
g Process
LUD 1.5.1: Form-based codes. Consider updating Zoning Ordinance sections or appropriate Precise Plans to include form-based code principles that reflect desired community form and character.

Community Development
Department Medium Included in new Precise Plans, R3
In Progress 4-10 years 1-3 years (R3)
Land Use Mix, Distribution and Intensit
y
LUD 3.1.4: Pioneer Area Study. Create a Pioneer Area Study to establish policy guidance on the future land uses and character of this area.

Community Development
Department Medium Not Started 10+ years
LUD 3.2.1: Zoning Ordinance update. Update the allowed uses and development standards for each zoning district in the Zoning Ordinance to encourage village centers, transit- oriented development, and a flexible mix of land uses where a
ppropriate.

Community Development
Department High Not Started 4-10 years
LUD 3.2.2: Mixed-Use development standards. Amend the mixed-use development standards in the Zoning Ordinance to facilitate mixed-use development.

Community Development
Department Medium
Community Development
Department (Planning) - New
Precise Plans include startards for
mixed-use developments. Not yet
integrated into Zoning Ordinance.
4-10 years
LUD 3.2.3: Industrial areas. Update the Zoning Ordinance to specify appropriate locations, if any, for educational, recreational, or commercial service uses in industrial areas.

Community Development
Department Medium
Community Development
Department (Planning) - East
Whisman and North Bayshore
Precise Plans provide more options
for locating education and
recreation uses in office/industrial
areas. Additional Zoning Districts
not yet addressed.
4-10 years
LUD 3.2.4: Height flexibility. Zoning Ordinance and Precise Plan updates shall specify required public benefits when development exceeds General Plan height guidelines.

Community Development
Department High
Community Development
(Planning) - East Whisman, San
Antonio, El Camino Real and
North Bayshore Precise Plans are
complete and provide direction for
height-related public benefits.

Additional Zoning Districts not yet
addressed.
4-10 years
LUD 3.3.1: Health and land use. Develop and/or update regulations and guidelines in the zoning code regarding the number and location of land uses that may impact community health, such as fast food and tobacco- and alcohol-related uses.

Community Development
Department Medium Not Started 4-10 years
LUD 3.4.1: Land use conflicts. Update the Zoning Ordinance to include standards and criteria to minimize potential land use conflicts.

Community Development
Department Medium Included in new Precise Plans 4-10 years LUD 3.10.1: Amend Zoning Ordinance to protect sensitive uses. Establish standards to protect sensitive uses from hazardous material users through Zoning Ordinance
amendments.

Community Development
Department Medium Not Started 4-10 years
Land Use and Access to Services
LUD 5.1.1: Zoning Ordinance amendments. Amend the
Zoning Ordinance to update allowed uses and development standards to accommodate a range and variety of village centers.

Community Development
Department Medium Included in new Precise Plans 4-10 years General Plan Action Plan 2021 Update
Table 1: Not Started, In Progress, and Recently Completed (in 2021):

Land Use and Design Element

Page 1 of 7 ends

Exhibit A
LUD 5.1.3: Old Middlefield retail and service uses. Update the Zoning Ordinance to include standards for retail uses at intersections along Old Middlefield Way while protecting service uses alon
g the corridor.

Community Development
Department Medium Not Started 4-10 years
LUD 5.1.4: Old Middlefield/Rengstorff residential use
compatibility. Address environmental and design issues to ensure the compatibility of new residential uses with
surrounding uses in the vicinity of the Old Middlefield Way /Rengstorff Avenue intersection.

Community Development
Department Medium Not Started 4-10 years
Neighborhoods
LUD 6.1.1: Transitions to low-density neighborhoods.

Develop guidelines or design standards for sensitive
transitions between low-density neighborhoods and adjacent village centers, transit-oriented development, corridors, or other more intense land uses.

Community Development
Department Medium Included in new Precise Plans, R3
In Progress 4-10 years 1-3 years (R3)
LUD 6.1.2: Compatible design measures. Require buffering, screening or other measures to ensure new multi-family or commercial development is compatible with adjacent single- famil
y neighborhoods and homes
Community Development
Department Medium Included in new Precise Plans, R3
In Progress 4-10 years 1-3 years (R3)
Downtown
LUD 7.5.1: Downtown Precise Plan updates. Maintain and update the Downtown Precise Plan.

Community Development
Department Medium In Progress 4-10 years Less than 1 year (Phase 1), 1-3 years (Phase 2)
Integrating Buildings into the Community
LUD 9.3.1: Update sign regulations. Update the City’s sign regulations to meet community design expectations and local business needs.

Community Development
Department Low Included in new Precise Plans 4-10 years LUD 9.3.2: Parking area. Update the Zoning Ordinance to address the visible im
pact of parking structures and lots.

Community Development
Department Low Included in new Precise Plans 4-10 years Sustainable Building Design and Development
LUD 10.2.1: Urban ecology awareness. Establish a process to ensure potential impacts of proposed projects to the natural ecosystem is made available prior to approval of project concepts involving open space or undeveloped land.

Community Development
Department
Community Services
Department Medium Not Started 4-10 years
LUD 10.6.1: Development standards. Update the Zoning
Ordinance to include development standards for installing on- site renewable ener
gy technologies.

Community Development
Department Medium Not Started 4-10 years
LUD 10.9.1: Sustainable roof standards. Update the Zoning Ordinance to address sustainable roof standards.

Community Development
Department Medium Not Started 4-10 years 1-3 years
Community Development Department (Planning) - The Zoning Ordinance and Precise Plans do not prohibit sustainable roofs, they can be a
pproved on a project-by-project basis.

Local Economy
LUD 14.1.1: Economic Development Strategy Report.

Prepare an Economic Development Strategy Report that
includes, but is not limited to, the following: Survey
businesses, developers, homeowners, and others to determine where and how to improve development- related City
services; Continue the use of the City’s rapid response team to assist small businesses in complying with the City’s permitting process; Streamline and improve the development review
process; Develop a list of pre-approved consultants to assist businesses with their development service needs; and Update and simplify development permit forms as feasible.

Community Development
Department High In Progress 4-10 years 1-3 years Community Development Department (Planning) - The City is currently developing an "Economic Vitality Strategy"
North Ba
yshore
District Sustainability. Create list of NBS district sustainability topics/ categories baseline measures and strategies.

Community Development
Department
Public Works
Department,
Com munity Services
De
partment
High Complete 4-10 years
Community Development Department (Planning) - Completed in 2021, available at
https://www.mountainview.gov/depts/comdev/planning/activep ro
jects/northbayshore_
San Antonio
LUD 21.4.1: Pedestrian and bicycle tunnel. Support the completion of a pedestrian and bicycle tunnel under Central Expressway as part of the redevelopment of the Mayfield Mall Precise Plan area.

Public Works Department
Community
Development
Department
Medium 4-10 years
Moffett Boulevard

CHANGE AREAS

Page 2 of 7 ends

Exhibit A
LUD 23.1.1: Street design standards. Create and implement Moffett Boulevard street design standards and improvements.

Community Development
Department, Public Works
Department
Low Not Started 10+ years 4-10 years
Public Works Department - Moffett Blvd Streetscape project is an unscheduled project in the CIP. Staff will introduce this as a CIP for Council consideration in 2023. Community Development Department (Planning) - Moffett Blvd Precise Plan is in 2021-2023 Strate
gic Roadmap
LUD 23.8.1: Parking study. Develop a parking study to include updated parking standards, TDM implementation,
shared parking facilities, and consideration of an improvement district.

Community Development
Department
Public Works
Department Medium 4-10 years Community Development Department (Planning) - TDM Ordinance is in 2021-2023 Strategic Roadmap
Bikeabilit
y
MOB 4.4.1: Update bicycle parking requirements. Update the bicycle parking requirements, including potential standards such as: New requirements based on number of dwelling units and commercial square footage, instead of percentage of car parking spaces. Updated bicycle parking standards and
guidelines that distinguish requirements for visitor, resident, and employee facilities. Updated standards and siting
guidelines for shopping centers and other village centers to significantly improve and increase bicycle access, parking, and safet
y.

Community Development
Department, Public Works
Department
Medium Not Started 4-10 years Community Development Department (Planning) - TDM Ordinance is in 2021-2023 Strategic Roadmap
Vehicle Parkin
g
MOB 7.1.1: Parking requirements. Update and regularly revisit parking standards to: Determine whether it is feasible to reduce or remove minimum requirements for certain
districts, land use categories, or development types; Consider the use of parking maximums; Consider allowing developers to meet minimum parking requirements by alternative means, such as shared parking between uses, payment of in-lieu fees, or off-site parking within a reasonable walking distance; Encourage all new commercial and mixed-use parking to be designed so that it is interconnected with adjacent parking facilities; and Provide preferred parking locations for prioritized vehicles such as car-share vehicles, rideshare vehicles, and zero emissions vehicles.

Community Development
Department
Public Works
Department Medium Included in new Precise Plans 4-10 years Community Development Department (Planning) -Downtown
Parking Strategy adopted in 2021 considers these actions for Downtown. Implementation of new standards may begin in 2023 (Downtown Precise Plan Phase 2).

MOB 7.1.2: Reduced parking with reduced demand.

Consider modifying minimum parking requirements for
development projects that implement Transportation Demand Management programs, locate near major transit nodes,
and/or feature specialized uses with lower parking demand (for example, senior housing, etc.).

Community Development
Department
Public Works
Department Medium Included in new Precise Plans 4-10 years Community Development Department (Planning) - Currently allowed through Conditional Use Permit process
MOB 7.2.2: Unbundled parking. Consider zoning standards and use the development review process to encourage
building owners of new multi-family and commercial
developments to lease parking spaces separately from
residential units and commercial space, and allow residents and employees of nearby buildings to lease the spaces at com
parable rates as building tenants.

Community Development
Department Medium Included in new Precise Plans 4-10 years MOB 7.2.3: Sustainable parking innovation. Consider
zoning standards and use the development review process to encourage building owners and developers of new
development and significant rehabilitation or expansion projects to install innovative and sustainable parking amenities

(for example, parking lifts, electric vehicle charging stations, solar canopies, permeable pavement, etc.).

Community Development
Department
Public Works
Department Medium Not Started 4-10 years
MOB 7.3.1: Public parking availability targets. Adopt parking availability targets and delegate to staff the necessary resources and authority to achieve the targets, including administrative and enforcement activities.

Public Works Department
Community
Development
Department
Medium Not Started 4-10 years Community Development Department (Planning) - Downtown Parking Strategy adopted in 2021 includes this action.

Mobility Element

Page 3 of 7 ends

Exhibit A
MOB 7.3.2: Public parking incentives. Consider using
incentive structures such as price as tools for achieving parking availability targets.

Public Works Department
Community
Development
De
partment
Medium Not Started 4-10 years Community Development Department (Planning) - Downtown Parking Strategy adopted in 2021 includes this action.

MOB 7.3.3: Public parking information tools. Provide tools for motorists to find available parking spaces, including way finding signage, real-time information signage, and accessible information through new technologies.

Public Works Department
Community
Development
Department
Low Not Started 4-10 years Community Development Department (Planning) - Downtown Parking Strategy adopted in 2021 includes this action.

Greenhouse Gas Emissions and Air Qualit
y
MOB 9.1.1: Greenhouse Gas Inventory. Maintain and
regularly update the City’s municipal and Community
Greenhouse Gas Inventory to track emissions.

City Manager's Office All Medium In Progress 4-10 years City Manager's Office (Sustainability) - The "Final 2018" and "Preliminary 2019" community GHG inventories were presented to Council on 6-22-21. A "Final 2020" municipal GHG inventory will be presented to Council in late spring 2022.

Vehicles and Roadway System Efficiency
MOB 10.2.1: New development. Impose and regularly
update TDM requirements for new development and
si
gnificant expansion or rehabilitation projects.

Public Works Department
Community
Development
De
partment
Medium In Progress 4-10 years Community Development Department (Planning) - TDM Ordinance is in 2021-2023 Strategic Roadmap
MOB 10.2.5: Funding and reporting. Develop requirements and funding mechanisms for TDM performance reporting to the Cit
y.

Public Works Department
Community
Development
De
partment
Medium In Progress 4-10 years Community Development Department (Planning) - TDM Ordinance is in 2021-2023 Strategic Roadmap
Water, Wastewater and Stormwater
INC 4.2.3: CalWater service. Evaluate and establish the franchise agreement with CalWater regarding their existing service in Mountain View.

Public Works Department CAO Medium In Progress 4-10 years 2 years from 2021 Public Works Department - Staff has begun communications with CalWater to identify the process and draft language for exectuing a franchise a
greement.

INC 6.2.3: Contaminated groundwater. Develop a policy or ordinance for discharge of contaminated groundwater
management during construction of subterranean structures.

Public Works Department,
Fire Department
Community
Development
Department/
Medium In Progress 4-10 years
Rec
ycled Water
INC 7.1.2: Salinity reduction policy. Develop and implement a comprehensive salinity reduction policy. Public Works Department Fire Department Medium In Progress 4-10 years 2-5 years from 2021 Public Works Department - The City of Palo Alto is managing the design and construction of the first phase project to reduce salt content of recycled water. Currently at 30% design. First phase antici
pated completion in 3 years.

Stormwater
INC 8.2.1: Trash capture. Thoroughly investigate and install full trash capture controls in the most appropriate locations to maximize trash removal from the storm drain system and
comply with the MRP.

Public Works
Department/Fire Department
Public Works
Department Medium In Progress 2-5 Years 2 years from 2021 Public Works Department - Trash Capture Implementation Update -

A new large trash capture unit was installed in the North Bayshore in 2019. Trash booms are also planned to be installed in Stevens and Permanente Creeks with expected installations in Spring 20 INC 8.4.5: Groundwater. Develop a policy or ordinance for groundwater management during construction of
subterranean structures, which require sumps to discharge to sewer.

Public Works Department,
Fire
Department
Community
Development
Department
Low Not Started 4-10 years
INC 8.8.1: Stormwater fee structure. Review and update the procedure and fee structure defining the cost of Stormwater system upgrades made necessary by new development,
considering the possibility of new impact and maintenance fees. Include in the consideration of a fee the practicality of reduced or eliminated Stormwater fees for projects that reduce or eliminate their burden on the Stormwater system through techniques such as on-site retention, treatment and reuse.

Fire Department/Public
Works Department
Fire Department, Public
Works Department Medium In Progress 4-10 years 2-5 years from 2021 Public Works Department - Project 20-51 was established to study funding strategies. An RFP is anticipated to be released in summer 2022.

Telecommunications
INC 9.1.1: Telecommunications implementation plan.

Develop a telecommunications implementation plan for the placement of utilities, aerial installations, and utility re
placement/upgrades in limited street rights-of-ways.

Public Works
Department/Community
Development Department
Community
Development
Department
Medium Not Started 4-10 years
Solid Waste and Rec
ycling
INC 10.4.1: Adaptive building reuse. Encourage adaptive reuse of existing buildings.

Community Development
Department Medium Included in new Precise Plans 4-10 years INC 10.4.2: Building deconstruction. Consider incentives to encourage building deconstruction instead of demolition.

Community Development
Department
Public Works
Department Medium Not Started 4-10 years
Climate Change
Infrastructure and Conservation Element

Page 4 of 7 ends

Exhibit A
INC 12.3.1: Adaptation. Develop and implement a long- term plan for adapting to the effects of climate change. City Manager's Office Public Works
Department,
Community
Development
Department
In Progress 10+ years
City Manager's Office (Sustainability) - Over the last 5-10 years, PWD staff has been working on a plan to address sea level rise. A city Resilience and Adaptation plan is included as item S1.7 in Sustainability Action Plan 4 (SAP-4). Due to COVID impacts and staffing constraints, staff has not started this plan yet. Staff will likely be
gin development of this plan in FY 2022-23.

Energy Production and Consumption
INC 13.2.1: Electric vehicle charging. Increase the availability of electrical vehicle charging, including the following actions:

Install charging stations at City facilities as feasible; Work with local and regional groups to site charging stations at optimal locations; and Develop requirements and standards for electric charging stations in new development.

Community Development
Department, Community
Services Department, Public
Works Department
Medium In Progress 4-10 years
Public Works Department/City Managers Office (Sustainability) - Building permit for new EV chargers at the City's 135 Bryant Street parking garage has been submitted. Upon installation completion, there will be new 10 level 2 charges, as well as make-ready infrastructure for future installation of additional 15 level 2 chargers.

Design for the 850 California Street parking garage EV chargers is underway. The current design includes 1 level charger and 34 new level 2 charges.

INC 14.1.5: Large institutions. Promote co-generation and district heating and cooling systems for large companies and institutions.

Community Development
Department
Public Works
Department Medium Included in new Precise Plans 4-10 years Watershed and Floodplain Management
INC 18.1.2: Conjunctive water use. Determine whether there is potential in some locations throughout the City to use remediated, formerly contaminated groundwater for certain uses.

Public Works Department City Manager's Office Medium Complete 4-10 years Public Works Department - No additional work planned. GTE site water reuse was deemed infeasible.

INC 18.2.1: Upgrades within contaminated areas. Develop and implement appropriate safety procedures and standards for replacement or upgrades to City infrastructure within contaminated areas identified by oversight agencies.

Public Works Department Medium In Progress 4-10 years
Public Works Department - The City coordinates with the EPA when projects are in contaminated areas of the City and follows recommended protocols such as the need for project specific Health and Safety Plans and Soil Management Plans.

Parks and Open Space
POS 1.2.1: Update Zoning Ordinance open space
requirements. Update Zoning Ordinance standards to require appropriate on-site park and recreation facilities based on the size of develo
pment.

Community Development
Department Medium Complete 4-10 years
Community Developemnt Department - New regulations were adopted to allow for parkland requirements to be satisfied with privately-owned, publicly-accessible parkland, or "POPAs". These re
gulations were adopted in March of 2021.

Trails
POS 6.1.1: Complete Stevens Creek Trail within the City.

Complete the Stevens Creek Trail by extending it to the southern City limits.

Community Services
Department, Public Works
Department
Low In Progress 2-5 years
Public Works Department - Project 20-50 provides 10% matching funds for a grant application for a new section of trail from Dale/Heatherstone to West Remington Drive. City of Sunnyvale has authorized to match Mountain View funding (cost sharing agreement needed). VTA has approved the project for inclusion in the bicycle/pedestrian priority list making it eligilbe for Measure B funding. Staff will be applying for Measure B funding.

POS 6.1.2: Extend Stevens Creek Trail. Work with other cities and agencies to extend the Stevens Creek Trail beyond the southern City limits.

Community Services
Department, Public Works
Department
Public Works
Department Low In Progress 2-5 years
Public Works Departmen
t - Staff continues to coordinate with City
of Sunnyvale staff regarding the Stevens Creek Trail Extension. City of Sunnyvale applied for VTA Measure B Grant for the design of the Stevens Creek Trail extension from Remington Drive (City of Mountain View's southernmost trail extension limit) to Fremont Boulevard. City of Sunnyvale plans to start design of the trail extension in summer 2021.

POS 6.1.4: Complete Bay Trail. Work with other cities and agencies to complete the Bay Trail.

Community Services
Department, Public
Works De
partment
Public Works
Department Low In Progress 10+ years
POS 6.1.5: Hetch Hetchy Corridor trails. Develop the Hetch Hetchy corridor for biking, hiking, and other recreational opportunities.

Community Services
Department, Public Works
Department
Community
Development
Department
Medium In Progress 4-10 years
Public Works Department - The Memorandum of Agreement has been completed with the San Francisco Public Utilities Commission regarding the public use of various stretches of the Hetch Hetchy pipeline right-of-way. CMV enjoys the largest reach of Hetch Hetchy right-of-way than any other peninsula city. Fayette Greenway between Fayette Street and El Camino Real was constructed in 2021.

The existing pathway along Bonnie and Beatrice Streets will be reconstructed in spring 2022. Further development of the corridor for biking and recreation is restricted by the SFPUC.

Parks, Open Space and Community Facilities Element

Page 5 of 7 ends

Exhibit A
POS 6.1.7: Build trail entry points. Work cooperatively within the City to build mini-trails to facilitate access to trails from neighborhoods, particularly ones that are underserved in o
pen space.

Community Services
Department, Public Works
Department
Low In Progress 10+ years 10+ years from 2021
Public Works Department - Colony Street Connection to
Permanente Creek Trail (CIP 18-48) construction is anticipated to be completed in summer 2022.

Pro
grams and Services
POS 7.1.2: Develop diverse programs. Create planning
programs relevant to the City’s cultural diversity.

Community Services
Department, City Manager's
Office, Library
Medium In Progress 4-10 years
Community Services Department/ City Managers Office - In partnership with the Human Relations Commission, will be hosting the 2022 Multicultural Festival in March 2022. This event began in 2017 with the intent of being held biannually. It was held again in 2019 and skipped 2021 due to the pandemic. In addition to this event, Recreation has incorporated diversity activities in events such as the Monster Bash and Community Tree Lighting Celebration.

Noise
NOI 1.4.1: Sound walls. In cases where sound walls are used, they should be encouraged to help create an attractive setting with features such as setbacks, changes in alignment, detail and texture, pedestrian access (if appropriate), and
landsca
ping.

Community Development
Department Low Not Started 4-10 years
NOI 1.4.2: Noise compatibility in mixed-use development.

Require that new mixed-use developments be designed to
limit potential noise from loading areas, refuse collection and other activities typically associated with commercial activity through strategic placement of these sources to minimize on- site noise levels.

Community Development
Department Low Included in new Precise Plans 4-10 years NOI 1.7.2: Shoreline Amphitheatre. Plan for and manage noise from Shoreline Amphitheatre operations.

Community Services
Department, City
Mana
ger's Office
Community
Development
De
partment, Police
Medium Not Started 4-10 years
Emergency Preparedness
PSA 4.2.6: Soft-story buildings. Conduct a study that
evaluates the City’s policy options, opportunities and
constraints for retrofitting soft-story buildings in Mountain View.

Community Development
Department, City Attorney's
Office
City Attorney's Office High In Progress 4-10 years Community Development Department (Building) - This study is currently on hold due to Covid-19.

PSA 5.1.1: Financial Incentives. Explore and apply financial and other incentives to help private entities replace or upgrade seismicall
y unsafe structures.

Community Development
Department High In Progress 4-10 years Community Development Department (Building) - This study is currently on hold due to Covid-19.

Greenhouse Gas Reduction Program Actions
Measure E-1.4: Residential Energy Star Appliances C:

Develop an outreach campaign to encourage developers to install Energy Star-rated major appliances in new residential units
City Manager's Office,
Community Development
Department (Building)
Low Not Started 4-10 years
City Manager's Office (Sustainability) - This could be incorporated into a more comprehensive outreach campaign to developers (to be developed in collaboration with CDD-Building). However, this is on hold, pending hiring the Building and Vehicle Electrification Anal
yst.

Measure E-1.5: Smart Grid A: Partner with PG&E and other community businesses to develop a community smart grid
integration plan
City Manager's Office High Not Started 4-10 years
City Manager's Office (Sustainability) - This is related to item E.3 in the Climate Protection Roadmap, but is not in Sustainability Action Plan 4 (SAP-4) or any other current work plan.

Measure E-1.5: Smart Grid B: Develop an outreach program that informs property owners and businesses about smart grid and smart appliance technologies
City Manager's Office High Not Started 4-10 years
City Manager's Office (Sustainability) - This is related to item E.3 in the Climate Protection Roadmap, but is not in Sustainability Action Plan 4 (SAP-4) or any other current work plan.

Measure E-2.1: Residential Solar Water Heaters A: Develop a resident outreach program to provide information on the benefits of SWH installation on residential buildings
City Manager's Office High Not Started 4-10 years
City Manager's Office (Sustainability) - Sustainability staff will discuss this with CDD-Building staff, to assess if additional permit streamlining is possible. However, this is on hold, pending hiring the Buildin
g and Vehicle Electrification Analyst.

Measure E-2.1: Residential Solar Water Heaters B:

Collaborate with PG&E to offer low-interest loans for
homeowners with swimming pools to switch to SWH systems City Manager's Office Medium In Progress 4-10 years City Manager's Office (Sustainability) - This is on hold, pending hiring the Building and Vehicle Electrification Analyst.

Measure E-2.1: Residential Solar Water Heaters C:

Collaborate with PG&E and other agencies to provide
information about funding sources and financial incentives to support installation and maintenance of SWHs, including the California Solar Initiative Thermal Pro
gram
City Manager's Office Medium In Progress 4-10 years
City Manager's Office (Sustainability) - The City website publishes information about incentives and rebates for various home upgrades, including solar photovoltaic.

Public Safety Element

Page 6 of 7 ends

Exhibit A
Measure E-2.1: Residential Solar Water Heaters D: Remove regulatory barriers to solar water heater systems installation City Manager's Office Community
Development
Department
High In Progress 4-10 years
City Manager's Office (Sustainability) - Sustainability staff will discuss this with CDD-Building staff, to assess if additional permit streamlining is possible. However, this is on hold, pending hiring the Buildin
g and Vehicle Electrification Analyst.

Measure E-2.2: Non-Residential Solar Water Heaters A:

Create an outreach program that promotes SWH systems and provides information for business owners about the California Solar Initiative Thermal Program and related federal
incentives
City Manager's Office
Community
Development
Department
Medium In Progress 4-10 years City Manager's Office (Sustainability) - This is on hold, pending hiring the Building and Vehicle Electrification Analyst.

Measure E-2.2: Non-Residential Solar Water Heaters B:

Remove regulatory barriers to SWH system installation City Manager's Office Community
Development
De
partment
Medium In Progress 4-10 years
Measure E-2.3: Residential Solar Photovoltaic Systems A:

Develop outreach and technical assistance programs to
encoura
ge the private installation of solar PV systems
City Manager's Office
Community
Development
De
partment
Medium In Progress 4-10 years City Manager's Office (Sustainability) - This is on hold, pending hiring the Building and Vehicle Electrification Analyst.

Measure E-2.3: Residential Solar Photovoltaic Systems B:

Provide information about rebates and low-interest financing programs for residential solar PV systems on the City’s website
City Manager's Office
Community
Development
Department
Medium In Progress 4-10 years
City Manager's Office (Sustainability) -The City website publishes information about incentives and rebates for various home upgrades,

including solar photovoltaic.

Measure E-2.4: Non-Residential Solar Photovoltaic Systems A: Analyze potential regulatory, structural, and market barriers to installing PV systems on non-
residential buildin
gs and parking lots
City Manager's Office
Community
Development
Department
High In Progress 4-10 years City Manager's Office (Sustainability) - This is on hold, pending hiring the Building and Vehicle Electrification Analyst.

Measure E-2.4: Non-Residential Solar Photovoltaic Systems B: Develop outreach and technical assistance programs to encourage the installation of non- residential solar PV systems City Manager's Office
Community
Development
Department
High In Progress 4-10 years
City Manager's Office (Sustainability) - The City website publishes information about incentives and rebates for various home upgrades,

including solar photovoltaic. This will also be addressed in Sustainabilit
y Action Plan 4 (SAP-4).

Measure E-5.1: Solar Photovoltaic Systems on Municipal Buildings A: Conduct solar power suitability analysis to determine potential of installing PV systems on other
municipal facilities
City Manager's Office Medium In Progress 4-10 years
City Manager's Office (Sustainability) - The City website publishes information about incentives and rebates for various home upgrades,

including solar photovoltaic. This will also be addressed in Sustainability Action Plan 4 (SAP-4), pending staffing availability Measure E-5.1: Solar Photovoltaic Systems on Municipal Buildings B: Consider entering into other PPAs, as
appropriate, during the duration of the GGRP
City Manager's Office Medium In Progress 4-10 years
City Manager's Office (Sustainability) - The City website publishes information about incentives and rebates for various home upgrades,

including solar photovoltaic.This will also be addressed in Sustainabilit
y Action Plan 4 (SAP-4).

Measure W-1.1: Urban Water Management Plan
Conservation Strategies A: Implement conservation
programs identified within the 2016 UWMP
Public Works Department Medium In Progress 4-10 years
Public Works Department - The City continues to coordinate with Valley Water and BAWSCA to implement conservation programs, such as those outlined in the 2016 UWMP and recently adopted 2021 UWMP.

Measure T-1.1: Transportation Demand Management A:

Adopt Transportation Demand Management Ordinance
Community Development
Department
Public Works
Department High In Progress 1-3 years
Measure CS-1.1: Enhance the Urban Forest A: Expand
existing tree planting efforts.

Public Works
Department/Community
Development
Department/Community
Services Department
Low In Progress 1-3 years
Community Services Department - In fiscal year 20-21, CSD partnered w/Canopy organization to plant 21 trees in parks; planted 180 trees in parks, medians and streets; and provided 220 Arbor Day trees to residents to plant in their yards. The City has entered a second year contract (FY 21-22) with non-profit organization Canopy to assist with tree planting efforts and community engagement, and is requesting funding to enter into a multi-year agreement. The 5- year update of the Community Tree Master Plan is currently underwa
y.

Page 7 of 7 ends

Exhibit B
General Plan Action Plan 2021 Update
Table 2: Completed Prior to 2021

ACTION ITEM RESPONSIBLE /LEAD DEPARTMENTS
LUD 3.1.1: Transit Zone requirements. Update the Transit Zone and Transit-Oriented Development Ordinance requirements and standards.

Community Development Department
LUD 3.3.2: Health implementation. Prepare a Health Implementation Report that recommends additional strategies and monitoring to address health and wellness in the community.

Community Development Department/City Manager's
Office
LUD 3.5.1: Senior housing definitions and standards. Establish new definitions and developmentstandards in the Zoning Ordinance for a continuum of senior care facilities, such as a senior residential communit
y, life care facility, hospice, or assisted living facility.

Community Development Department
Sustainable Building Design and Development
LUD 10.7.1: Update landscaping requirements. Update the Zoning Ordinance to include updated landscaping requirements.

Community Development Department
LUD 10.7.2: Water Conservation Landscaping Ordinance. Maintain and implement the Water Conservation in Landscaping Ordinance.

Community Development Department/Public Works
Department
Local Economy
LUD 13.1.1: Attract business-class hotel. Attract a business-class hotel and conference center to Mountain View to meet business and community needs.

Community Development Department
North Bayshore
LUD 15.2.1: Baseline measures. The North Bayshore Precise Plan shall specify transportation performance measures and improvements for the area; include standards and requirements for open space between buildings; cluster FAR in key areas such as along Shoreline Boulevard and at transit nodes;

require buffers along the creeks and Shoreline at Mountain View Regional Park; require new development to be sensitive to the wildlife corridor and to existing natural resources and trees; and include safe
guards about view and the environment.

Community Development Department/Public Works
Department
LUD 15.3.1: Highly sustainable incentives and performance measures. Develop a range of incentives, such as increased floor area ratio, for the North Bayshore Area for new or significantly rehabilitated highly sustainable development. Performance measures could include sustainable development that exceeds current regulations and/or innovative community benefits that improve quality of life and miti
gate potential impacts from greenhouse gas emissions.

Community Development Department
LUD 16.2.1: Comprehensive North Bayshore Precise Plan. Combine existing North Bayshore Precise Plans and/or zoning districts into one comprehensive and integrated Precise Plan.

Community Development Department
LUD 16.2.2: Form-based zoning. Include form-based zoning codes in the updated North Bayshore Precise Plan that specify the desired future character along North Shoreline Boulevard and other areas. Community Development Department LUD 16.2.3: North Shoreline Boulevard street standards. Develop new City street design standards for North Shoreline Boulevard.

Community Development Department/Public Works
Department
Land Use Mix, Distribution and Intensity Element

CHANGE AREAS

Page 1 of 6 ends

Exhibit B
LUD 16.2.4: Small business diversity. The North Bayshore Precise Plan shall establish policies that encourage and/or provide incentives for small, non-campus businesses and services, which may include locations where lower FAR is maintained.

Community Development Department
LUD 16.2.4: Healthy food. Explore strategies to provide access to healthy food sources, such as grocery stores or a farmer’s market for area residents and em
ployees.

Community Development Department/City Manager's
Office
LUD 16.5.1: New development and views. During review of North Bayshore projects, require analysis of how new buildings would affect views of the mountains.

Community Development Department
LUD 17.1.2: North Bayshore Transportation Study. Prepare an access and circulation study to address existing access and circulation limitations in North Bayshore, which could include but not be limited to feasibility of park-and-ride lots and additional transit, pedestrian, and bicycle facilities and im
provements.

Public Works Department
LUD 17.1.3: North Bayshore Transportation Management Association (TMA). Facilitate creation of a North Bayshore Transportation Management Association (TMA) to manage the operation of the North Bayshore Shuttle System, including a mechanism for new and existing businesses to contribute towards the o
perational expenses of the TMA.

Community Development Department/Public Works
Department
LUD 17.1.4: North Bayshore Shuttle System branding. Facilitate the promotion and branding of the North Bayshore shuttle system to increase public awareness and ridership.

Community Development Department/Public Works
Department
LUD 17.1.9: Precise plan integration. The North Bayshore Precise Plan shall integrate Council- supported transportation strategies from the North Bayshore Transportation Study.

Community Development Department/Public Works
Department
LUD 17.3.1: Improve connectivity. Ensure the North Bayshore Precise Plan update addresses bicycle and pedestrian improvements, requirements, and guidelines for a finer street grid of smaller blocks, im
proved connections as parcels redevelop, and implementation strategies.

Community Development Department/Public Works
Department
LUD 18.1.1: Vulnerability Risk Assessment. Prepare a Vulnerability Risk Assessment that identifies City facilities and infrastructure and areas with private properties that may be at risk.

Community Development Department/City Manager's
Office
LUD 18.1.2: Sea-Level Rise Adaptation Strategy Report. Prepare and update a Sea-Level Rise Adaptation Strategy Report.

Community Development Department/City Manager's
Office
LUD 18.2.1: Transfer of Development Rights program. Develop a Transfer of Development Rights program to allow properties to transfer their development rights and convert to wetland or detention pond areas.

Community Development Department
East Whisman
LUD 19.1.1: Transit Zone ordinance update. Update the process and requirements of the Zoning Ordinance Transit Zone to allow greater land use intensity within one-half mile of area light rail transit stations.

Community Development Department
LUD 19.2.1: Highly sustainable incentives and performance measures. Develop a range of incentives, such as increased floor area ratio, for the East Whisman Area for new or significantly rehabilitated, highly sustainable development. Performance measures could include sustainable development that exceeds current regulations and/or innovative community benefits that improve quality of life and mitigate potential impacts from greenhouse gas emissions.

Community Development Department
LUD 19.3.1: Improve connectivity. Plan for mobility improvements that support smaller blocks and improved bicycle and pedestrian connections through the area as parcels redevelop.

Community Development Department

Page 2 of 6 ends

Exhibit B
LUD 19.3.2: Improved pedestrian and bicycle connection. Plan, design, and construct an improved pedestrian and bicycle connection between East Whisman, and the NASA/Ames VTA Light Rail Station.

Community Development Department/Public Works
Department
LUD 19.3.3: Additional connectivity measures. Develop additional pedestrian and bicycle measures along publicly accessible streets and paths and additional TDM measures to be applied to development outside of a one-half mile distance from li
ght rail stations.

Community Development Department/Public Works
Department
LUD 19.4.2: Bicycle and pedestrian improvements list. Develop a master list of bicycle and pedestrian improvements for the East Whisman area to be implemented through transit-oriented development projects.

Community Development Department/Public Works
Department
LUD 19.4.3: Parking innovation. The Transit-Oriented Development Ordinance shall specify innovative parking strategies and requirements.

Community Development Department
LUD 19.5.1: Zoning Ordinance update. Update the Zoning Ordinance with development standards for new retail and service uses that serve surrounding residential and working populations. Community Development Department LUD 19.5.2: Exempting retail floor area. Develop standards to exempt retail floor area ratio as part of new office developments or major remodeling projects in underserved retail areas.

Community Development Department
LUD 19.6.1: Commercial design elements. Update policy documents to specify commercial design elements that provide sensitive transitions between residential and commercial land uses.

Community Development Department
LUD 19.6.2: Height and intensity transitions. The Transit-Oriented Development Ordinance shall specify development standards including sensitive design transitions and lower intensities and height limits for commercial areas alon
g North Whisman Road adjacent to residential areas.

Community Development Department
El Camino Real
LUD 20.2.1: Specify more intensive development criteria. Update the Zoning Ordinance to specify criteria where more intensive development may be most appropriate along El Camino Real. Community Development Department LUD 20.2.2: Allow greater densities for larger sites. Amend the Zoning Ordinance to allow greater densities for larger project sites along the El Camino Real corridor.

Community Development Department
LUD 20.8.1: Collaborate on street design standards. Work with surrounding cities and Caltrans to develop street design standards for El Camino Real.

Public Works Department/Community Development
Department
San Antonio
LUD 21.2.1: Ortega/California development. Ensure new zoning or precise plan standards for the Ortega/California parcel, within the Mixed Use Corridor designation, include specific standards for senior housing and other residential uses and ensure future residential development at this location is com
patible with surrounding uses.

Community Development Department
LUD 21.3.1: California Street corridor improvement study. Complete a corridor improvement study for California Street.

Community Development Department/Public Works
Department
LUD 22.1.1: Comprehensive San Antonio Precise Plan. Combine existing San Antonio Area Precise Plans and/or zoning districts into one comprehensive and integrated Precise Plan (consistent with the Chan
ge Area).

Community Development Department
Vehicles and Roadway System Efficiency
MOB 10.1.5: Transportation impact fee. Consider adopting a transportation impact fee to mitigate transportation impacts of new development.

Community Development Department/Public Works
Department
Mobility Element

Page 3 of 6 ends

Exhibit B
MOB 10.2.6: Targeted improvements. Explore opportunities to apply traffic impact fees toward bicycle, pedestrian, transit and roadway improvements in order to improve the overall transportation system and o
ptimize travel by all modes.

Community Development Department/Public Works
Department
Complete Streets
MOB 1.3.3: Grade separation policy. Develop grade separation policies for the Caltrain rail and Central Expressway corridor.

Public Works Department
Walkability
MOB 3.1.5: Unimproved Street Policy. Create a set of guidelines to improve pedestrian accommodation within the roadway where sidewalks are not desired by neighborhood residents, according to the City’s Polic
y.

Public Works Department
MOB 3.3.1: Key crossings. Develop a priority list for enhanced pedestrian and bicycle crossings along key barriers, such as railroad tracks, El Camino Real, Highway 85, Highway 101, Highway 237, Shoreline Boulevard, Grant Road, Middlefield Road, and Central Ex pressway.

Public Works Department/Community Development
Department
Performance Measures
MOB 8.1.2: Alternative impact thresholds. Study and implement new significance thresholds and performance indicators that balance the needs of all modes for different street types and/or locations; provide guidance on appropriate mitigations for transportation impacts; and establish policies for Statements of Overriding Consideration for transportation impacts in Environmental Impact Reports (EIRs).

Community Development Department/Public Works
Department
MOB 8.1.3: Interim level of service (LOS) standards. Until adoption of new significance thresholds of performance indicators occurs, the Citywide vehicle LOS standards from the 1992 General Plan, which include a target peak hour LOS policy of LOS D for all intersections and roadway segments, with the following exceptions in high-demand areas:
• Use LOS E for intersections and street segments within the Downtown and San Antonio areas where vitality, activity and multi-modal transportation use are primary goals; and • Use LOS E for intersections and street segments on CMP designated roadways in Mountain View (e.g., El
Camino, Central Expressway and San Antonio Road).

Community Development Department/Public Works
Department
MOB 8.2.1: System performance target. Ensure new performance measures include tools for balancing the needs of each mode.

Community Development Department/Public Works
De
partment
MOB 8.2.2: Monitoring and reporting. Develop a clear mechanism for ongoing feedback to the City Council, other City boards and commissions, and the community on transportation issues, priorities and successes based on established measurement criteria.

Community Development Department/Public Works
Department
Water, Wastewater and Stormwater
INC 4.3.2: Fee structure. Review and update the procedure and fee structure, defining the cost of water system upgrades made necessary by new development, considering the possibility of new impact and maintenance fees in order to create a sustainable water su pply system.

Public Works Department/Finance Department
INC 5.5.1: Landscape Water Conservation Ordinance. Update the City’s Water Conservation in Landscaping Ordinance as necessary.

Community Development Department/Public Works
Department
Infrastructure and Conservation Element

Page 4 of 6 ends

Exhibit B
INC 6.1.7: Wastewater fee structure. Review and update the procedure and fee structure for the cost of system upgrades made necessary by new development, considering the possibility of new impact and maintenance fees to ensure a sustainable s
ystem.

Finance Department/Facilities/Public Works Department
INC 6.4.1: Moffett Field sewer discharge. Work with the Palo Alto Regional Water Quality Control Plant and other relevant agencies to create and implement a strategy for addressing Moffett Field wastewater dischar
ge.

Public Works Department/City Attorneys Office/Fire
Department
Recycled Water
INC 7.1.1: Recycled Water Master Plan. Develop a comprehensive recycled water master plan and alternatives analysis.

Public Works Department
INC 7.4.1: Trees and landscaping. Develop a landscape and tree plant palette suitable for recycled water, including a strategy for removal of redwood trees.

Community Services Department/Community
Development Department/Public Works Department
Green Building
INC 15.1.3: Green building incentives. Establish standard administrative or financial incentives for green building such as fee reductions, expedited plan check, staff support or other incentives.

Community Development Department/Finance
Programs and Services
POS 6.1.3: Complete Permanente Trail. Complete the Permanente Creek Trail by extending it to Middlefield Road.

Community Services Department/Public Works
Department
POS 6.1.6: Enhance Light Rail Trail. Complete and enhance the Light Rail Trail between Whisman Station and Middlefield Road. Explore opportunities to expand the trail to the Bayshore NASA Light Rail Station.

Community Services Department/Public Works
Department/Community Development Department
POS 7.5.1: Update Library Space Utilization Study. Update and evaluate the Library Space Utilization Stud
y as needed to accommodate a variety of future Library facility needs.

Library/Public Works Department
POS 8.1.3: Introduce child care in employment areas. Consider Zoning Ordinance revisions that will allow day care in employment centers such as the North Bayshore and East Whisman areas.

Community Development Department/Fire
Department/City Manager's Office
Trees, Gardening and Landscaping
POS 13.1.1: New Community Garden: Establish a new community garden. Public Services De partment Greenhouse Gas Reduction Program Actions
Measure E-1.1: Residential Energy Efficiency Retrofit A: Consider funding to continue the Residential Energy Assessment and upgrade Program beyond the initial 2012 timeframe Community Development Department
Measure E-1.8: Building Shade Trees in Residential Development A: Amend the Zoning Ordinance to require the planting of one mature building shade tree to accompany each new single-family residential unit
Community Development Department/Community
Services Department
Measure E-3.1: Energy Efficiency in Municipal Buildings A: Perform cost-benefit analyses for municipal building operations and maintenance upgrades to identify GHG emissions reductions associated with o
ptions under consideration
Public Works Department/Community Development
Department
Measure E-3.1: Energy Efficiency in Municipal Buildings B: Evaluate the success of the municipal li
ghting system energy efficiency upgrades
Public Works Department/Community Development
Department
Measure E-3.1: Energy Efficiency in Municipal Buildings C: Identify other municipal buildings that would benefit from energy efficiency upgrades
Public Works Department/Community Development
Department
Parks, Open Space and Community Facilities Element

Page 5 of 6 ends

Exhibit B
Measure E-3.1: Energy Efficiency in Municipal Buildings D: Develop a schedule for municipal building energy audits such that buildings are audited every 10 years Public Works Department/Community Development
Department
Measure E-4.1: Energy Efficiency in Streetlights and Traffic Lights B: Convert all street lights to LED bulbs, induction lighting or LED-solar combined systems Public Works Department/Community Development
Department
Measure E-4.1: Energy Efficiency in Streetlights and Traffic Lights C: Complete conversion of all HPS streetlights to induction lighting
Public Works Department/Community Development
De
partment
Measure W-1.1: Urban Water Management Plan Conservation Strategies B: Prioritize public buildings for water fixture upgrades and identify upgrades to be made Public Works Department
Community Choice Energy: Participate in multijurisdictional effort involving a Community Choice Energy scoping study and feasibility study.

City Manager's Office/Public Works Department

Page 6 of 6 ends

Exhibit C
General Plan Action Plan 2021 Update
Table 3: Ongoing and Day-to-day Items

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
Planning Process
LUD 1.2.1: On-line document system. Improve the accessibility and ease of use of the City’s online document system through emerging technologies. IT/CDD High Many documents are available online through Laserfiche.

LUD 1.4.1: Outreach accessibility. Ensure that outreach is available to all populations by providing translation, convenient meeting times, and submittal of public input using latest technologies.

CDD/CMO/PWD/CSD High
Translation services for public meetings are available upon request.

Most public meetings are scheduled outside of mornal working hours and meetings are streamed online via Legistar and Youtube.

Regional Coordination
LUD 2.2.1: Support regional planning. Commit staff resources to participate in regional and other key planning issues. CDD/PWD Medium This item is addressed within CDD department goals/ objectives and through the development review process.

LUD 2.5.1: Comprehensive Land Use Plan (CLUP) Consistency. Evaluate land uses and development within the Airport Influence Area (AIA) for consistency with the safety, height, noise, and related policies of the CLUP.

CDD Medium Consistency with the CLUP is evaluated during the development review process.

Land Use Mix, Distribution and Intensity
LUD 3.1.2: Increase public transit use. Develop strategies to increase public transit ridership through coordination with transit agencies and private employers.

CDD/PWD High T.M.A has been formed. TDM requirements have been applied to new projects and with new precise plans .

LUD 3.1.3: Projects near rail corridors and arterials. Address air quality and noise impacts on new projects near rail corridors and arterials through appropriate site and building design, materials, and technologies.

CDD Medium Occurs during development review & CEQA review process.

LUD 3.5.2: Diverse households. Support affordable housing development to serve a range of household types and incomes through strategies identified in the City’s Housing Element (Goals, Policies, and Implementation Programs).

CDD High
Implemented with the Housing Element programs, through
development review of residential projects and through housing NOFA process.

Land Use and Access to Services
LUD 4.1.1: Accessibility and amenity improvements. Identify accessibility and connectivity improvements to and within neighborhood centers, and enhance pedestrian and bicycle facilities through City plans, Capital Improvement Projects, and during review of private development projects.

CDD/PWD High This is included within the North Bayshore, East Whisman, El Camino Real and San Antonio Precise Plans.

Land Use and Design Element

Page 1 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
LUD 5.1.2: Existing village and commercial centers. Use the development review process to require pedestrian and bicycle enhancements at existing village and commercial centers to improve neighborhood connectivity to goods and services.

CDD Medium
This is included within the North Bayshore, East Whisman, El Camino Real and San Antonio Precise Plans and implemented on a project-by-project basis through development review.

LUD 17.2.1: Transportation Demand Management measures. Implement measures for the North Bayshore Area.

Community Development
Department High Implemented on a project-by-project basis through development review.

Downtown
LUD 7.1.1: Downtown Committee. Maintain the Downtown Committee as an advisory committee that reviews Downtown policies and procedures. CDD Medium Downtown Committee meets every 1st Tuesday of the month.

LUD 7.1.2: Downtown facilities. Support the use of Downtown facilities for civic events. All Departments Medium
LUD 7.6.1: Manage parking strategies. Evaluate both short- and long-term parking strategies. CDD/PWD High Parking Work Plan is in effect. Recived Council approval to procced with various parking pilot programs
Streetscapes and Public Spaces
LUD 8.1.1: Implement gateway improvements. Include gateway improvements where appropriate in plans such as the City’s Capital Improvement Program, new or amended Precise Plans, or other special plans, and through public and private development projects. Gateway improvements could include new and remodeled buildings, landscaping, plazas, and visual art elements.

CDD/PWD Medium
This is included within the North Bayshore, East Whisman and San Antonio Precise Plans and implemented on a project-by-project basis through development review.

Integrating Buildings into the Community
LUD 9.1.1: Implement design compatibility. Utilize precise plans, design guidelines, and zoning standards to ensure high-quality site and architectural design and compatibility between new and existing development.

CDD Low
This is included in the North Bayshore, East Whisman, El Camino Real and San Antonio Precise Plans and implemented during development review.

LUD 9.4.1: Complete Streets design standards. Adopt Complete Streets Design Standards and other pedestrian-oriented street design concepts from the Mobility Element.

CDD/PWD This is included in the North Bayshore, East Whisman, El Camino Real and San Antonio Precise Plans.

LUD 9.6.1: Light Standards. Adopt and periodically update a set of City Code regulations, standard mitigation measures and/or development conditions to minimize off-site light and glare from new development.

CDD Low Implemented on a project-by-project basis with conditions of approval.

Sustainable Building Design and Development
LUD 10.2.2: Protection of wildlife nursery sites. Require preconstruction surveys for nesting birds and/or roosting bats prior to any development that involves the removal of vegetation and/or demolition/restoration of abandoned structures (e.g., houses, barns, sheds, bridges).

CDD/CSD
Low
Mitigation Measures and conditions already exist.

LUD 10.4.1: Support sustainability measures. Support programs and strategies to encourage community members to perform upgrades that address sustainability and healthy indoor environment goals.

CDD Medium Included in Climate protection Roadmap (CPR).

LUD 10.6.2: Minimize permit fees and timelines. Minimize permit fees and process timelines for the installation of on-site renewable energy technologies.

CDD High
Solar fees are already very low due to state law. Onsite renewable energy installations generally don’t require a Planning permit and therefore have a streamlined review.

Page 2 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
LUD 10.10.1: Public outreach and education. Provide public outreach and education on sustainability practices through over-the-counter materials and online resources.

CDD Medium The City website has been updated, and sustainability staff launched a public education campaign in 2017.

LUD 10.10.2: Environmental education. Provide public environmental education by integrating visible examples of green technology into public buildings.

CDD Medium
Historic Preservation
LUD 11.1.1: Register of Historic Resources. Maintain and update the Mountain View Register of Historic Resources. CDD Low The Planning Division maintains and updates the Register of Historic Resources.

LUD 11.1.2: Promote historic resources. Encourage and promote public awareness of Mountain View’s historic and cultural resources. All Departments Medium In partnership with the Historical Society, the Library provides access to a collection of books, papers, and photographs related to Mountain View's history.

LUD 11.1.3: Historic resource changes. Utilize the development review process to ensure that changes to historic resources are consistent with the U.S. Secretary of Interior Standards for the Treatment of Historic Properties.

CDD Low This is required by state law and the Mountain View Municipal Code. It is implemented during the development review process.

LUD 11.3.1: Early historic evaluation. Identify and evaluate historic and cultural resources early in the development review process. CDD Low This is evaluated during the informal and formal Planning Application stages.

LUD 11.3.2: Assistance for historic properties. When possible, provide assistance for properties listed in the Mountain View Register of Historic Resources to be nominated as properties in the California and/or National Register of Historic Places.

CDD Medium Staff assists owners with this process.

LUD 11.3.3: Register of Historic Resources benefits. Promote the benefits for properties listed on the Mountain View Register of Historic Resources. CDD Low Benefits for historic properties are listed in the Zoning Ordinance.

LUD 11.3.4: Mills Act contracts. Support Mills Act contracts to preserve historic resources. CDD Low Staff supports Mills Act Contracts on a case-by-case basis.

LUD 11.5.1: Review Historic Property Directory List. Prior to approval of development permits for projects that include ground-disturbing activities.

The most recent and updated Northwest Information Center list: Historic Property Directory for the County of Santa Clara shall be consulted to determine if known archaeological and paleontological sites underlie the proposed project. If it is determined that known cultural resources are within ¼ mile of the project site, the City shall require the project applicant to conduct a records search at the Northwest Information Center (NWIC) at Sonoma State University to confirm whether there are any recorded cultural resources within or adjacent to the project site. Based on that research, the City shall determine whether field study by a qualified cultural resources consultant is recommended.

CDD/PWD
Low
This is implemented through project conditions of approval and CEQA mitigation measures.

Page 3 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
LUD 11.5.2: Pre-construction cultural resource surveys. Should City staff determine that field study for cultural resources is required, the project applicant shall have a cultural resource professional meeting the Secretary of the Interior’s Standards in history and/or archaeology conduct a preconstruction survey to identify significant cultural resources – including archaeological sites, paleontological resources, and human remains – in the project site and provide project-specific recommendations, as needed.

Coordination with local Native American communities should be done when significant cultural resources and remains are identified as part of pre- approval site analysis.

CDD/PWD
Low
This is implemented through project conditions of approval and CEQA mitigation measures.

LUD 11.5.3: Archaelogical and paleontological standard conditions. Adopt and periodically update a set of standard mitigation measures and development conditions to address the discovery and identification of archaeological and paleontological deposits.

CDD/PWD
Low
This is implemented through project conditions of approval and CEQA mitigation measures.

LUD 11.6.1: Human Remains. Should human remains be found on a project site, no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains shall be disturbed until the Santa Clara County Coroner is contacted and determines that no investigation of the cause of death is required. If an investigation is required, and the coroner determines the remains to be Native American then: (1) the coroner would contact the Native American Heritage Com-mission within 24 hours; (2) the Native American Heritage Commission would identify the person or persons it believes to be the most likely descended from the deceased native American; (3) the most likely descendent may make recommendations to the landowner or the person responsible for the excavation work, for means of treating or disposing of, with appropriate dignity, the human remains and any associated grave goods as provided in Public Resources Code Section 5097.98 and Health & Safety Code Section 7050.5.

CDD/PWD
Low
This is implemented through project conditions of approval and CEQA mitigation measures.

Economic Development and Fiscal Stability
Fiscal Stability
LUD 12.1.1: Financial Forecast. Maintain and update the City’s 10-year Financial Forecast. FIN 10 Year GOF forecast was presented to Council in April 2015 and included in 15/16 Adopted Budget
LUD 12.3.1: Fiscal impact analysis. Require fiscal impact analysis of proposed General Plan or Zoning Ordinance Amendments and major development projects.

CDD Medium
LUD 12.3.2: Conversion of industrial to residential lands policy. Maintain and update the City’s Policy on Converting Industrial to Residential Lands. CDD Medium The Zoning Ordinance includes exceptions from the gatekeeper process for certain projects converting land from industrial to residential uses.

LUD 12.5.1: Cost-saving projects. Develop, evaluate, and prioritize a list of projects that reduce operational expenses. CDD/CMO Medium This is an on-going effort on behalf of all City departments - we are continuously improving and looking at efficiencies. There are numerous items identified in the Municipal Operations Climate Action Plan (MOCAP), and the adopted budget.

Page 4 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
Jobs and Innovation
LUD 14.3.1: Grant funding. Identify and pursue grant and funding opportunities to develop emerging technology pilot programs and services. All / IT Medium LUD 14.4.1: Develop Partnerships: Develop partnerships and market the City's business districts to local and regional organizations. CDD Medium Partnering with the Chamber of Commerce, Central Bussiness Association, Silicon Valley Economic Development Association & Nova Works as a Workforce Investment Board

CHANGE AREAS
North Bayshore
Innovation and Sustainability
LUD 15.1.1: Corporate and emerging technology focus. Market the North Bayshore Area to the corporate business community and to emerging technology businesses.

CDD Medium The City is in ongoing conversations with the bussineses, Real Estate Brokers & Developers.

Land Use and Design
LUD 16.1.1: Public easements. Ensure open space amenities, plazas, pathways, and park areas remain publicly accessible by requiring public easements, when necessary.

CDD/PWD/CAO High This is addressed in the North Bayshore Precise Plan.

LUD 16.1.2: Burrowing owl avoidance/protection during development.

Require preconstruction surveys and protection measures for burrowing owls prior to any North Bayshore development activities on parcels that a qualified biologist has determined provide suitable under-ground retreats (e.g., ground squirrel burrows, debris piles, storm drain inlets) that could be occupied by either breeding or wintering owls. Consultation with the California Department of Fish and Game shall be required for any site on which burrowing owls are found during the preconstruction survey.

CDD/CSD
High
Mitigation Measures and conditions exist, but protection of Burrowing Owls is a high priority which is evaluated with new development applications.

LUD 16.1.3: Special-status plant surveys. Require preconstruction surveys for Congdon’s tarplant and other special-status plant species prior to development of any ruderal or grassland habitat in the North Bayshore area in accordance with CDFG protocols.

CDD/CSD
High
Mitigation Measures and conditions exist, but bay vegetation is a high priority.

Mobility
LUD 17.1.1: Partnerships. Pursue public-private partnership opportunities to improve connectivity and integrate transportation systems. CDD/PWD High TMA has been formed LUD 17.1.5: New North Bayshore Shuttle System. Develop strategies to incorporate existing shuttles into a new North Bayshore shuttle system. CDD/PWD High LUD 17.1.6: North Bayshore shuttle and Downtown. Improve connectivity and efficiency of shuttle service between the North Bayshore area and the Downtown transit center.

CDD/PWD High
LUD 17.1.3; Automated Guideway Transit Feasibility Study completed.

LUD 17.1.7: City-wide shuttle integration. Evaluate the integration of the North Bayshore Shuttle System with a City-wide shuttle system. CDD/PWD High TMA is responsible for the Shuttle including NBS. MV City Shuttle serves other areas.

Page 5 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
LUD 17.1.8: Future transportation options. Evaluate future North Bayshore transportation strategies, including fixed rail and Personal Rapid Transit options.

CDD/PWD High
LUD 17.1.3. VTA Feasilbility Study.

LUD 17.2.1: Transportation Demand Management measures. Implement measures for the North Bayshore Area. CDD High Implementation is ongoing with project review.

LUD 17.2.2: Traffic management plan. Update the City’s traffic management plan for Shoreline Amphitheatre events. CMO/POL LUD 17.3.2: Trail access. Improve access to Permanente and Stevens Creeks and Bay Trails. CDD/CSD Medium Trail access is maintained/improved with North Bay shore developments.

East Whisman
LUD 19.4.1: Transportation Demand Management measures. Implement TDM measures for the East Whisman area. CDD High Implementation is ongoing with project review in the East Whisman Precise Plan.

El Camino Real
LUD 20.7.1: Implement pedestrian improvements. Implement pedestrian improvements identified in the Pedestrian Master Plan and through private development projects.

PWD/CDD High Policy directions integrated in Precise Plans will be implemented through CIP and private development projects.

LUD 20.9.1: Bus Rapid Transit design. Work with the VTA on the design of the Bus Rapid Transit (BRT) service. PWD/CDD Medium The City Council endorsed dedicated lane configuration in 2015.

Moffett Boulevard
LUD 23.7.1: Improve connectivity. Develop and implement strategies to encourage transit, pedestrian, and bicycle access and connectivity along and across the Central Expressway corridor.

PWD/CDD Medium
Addressed in Shoreline Corridor Study as well asthrough the Rengstorff Grade Separation Design Concept project (#09-28). 100 Moffett Blvd private development, Bicycle Transportation Plan Update, Multimodal plan and CIP projects. (e.g. Shoreline Blvd Pathway Design (CIP 15-32)
MOB 1.1.1: Mobility plans. Ensure mobility master plans include or reference priority project lists intended to maintain and enhance the multi- modal transportation system.

PWD/CDD Medium
MOB 1.1.2: Multi-modal design. Update street design standards to address roadway function, adjacent land use, and accommodations for all modes. PWD/CDD Medium Being updated incrementally, through PWD requested CIP and updated street design standards in the North Bayshore, East Whisman, San Antonio and El Camino Real Precise Plans.

MOB 1.1.3: Existing resources. Consult existing resources for design guidance in developing street design standards. PWD/CDD Medium MOB 1.2.1: Complete Streets. Implement complete streets policies and standards in new street design standards, new streets projects, and in street rehabilitation projects.

PWD/CDD Medium
MOB 1.2.2: Grand Boulevard Initiative. Implement principles of the Grand Boulevard Initiative along El Camino Real. PWD/CDD High Initiatives incorporated in El Camino Real Precise Plan Mobility Element

Page 6 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
MOB 1.2.3: Targeted standards. Consider additional corridor-specific and/or Precise Plan-based street design standards and guidelines to enhance multi-modal environments (for example, streets, sidewalks, landscaping, and furniture).

CDD/PWD Medium Implemented through the North Bayshore, East Whisman, San Antonio and El Camino Real Precise Plans.

MOB 1.3.1: Pedestrian and bicycle connections. Ensure Precise Plans and zoning standards include guidelines for public greenways to create strong pedestrian and bicycle connections, particularly in locations where large blocks are prevalent and vehicular through-connections may not be feasible.

CDD/PWD High Implemented through the North Bayshore, East Whisman, San Antonio and El Camino Real Precise Plans.

MOB 1.3.2: Development review. Use the development review process to identify and implement pedestrian and bicycle improvements in private development projects and along adjacent street frontages.

CDD/PWD High Implemented through the North Bayshore, East Whisman, San Antonio and El Camino Real Precise Plans.

MOB 1.3.4: Grade separations. Support plans for new grade-separated infrastructure (for example, bridges and underpasses) and updates to existing infrastructure consistent with grade separation policies, to reduce conflicts between modes and improve accommodations for non-automotive travel.

PWD Medium
Implemented through the annual CIP development and approval process. Also through regional transportation efforts. As part of Phase 1 of the Transit Center Master Plan, the City Council approved a grade separation concept for the Castro Street rail crossing that re-routes Castro Street at the tracks.

MOB 1.4.1: Street grid. Identify and leverage opportunities for a street grid of smaller blocks and improved connections as parcels redevelop. CDD/PWD Medium Implemented through the North Bayshore, East Whisman, San Antonio and El Camino Real Precise Plans.

MOB 1.4.2: Municipal uses. Review street design standards to ensure they consider utility infrastructure, emergency access, and service access needs. PWD Medium MOB 1.5.1: Connected network. During review of new subdivisions and major redevelopments, ensure new development provides or enhances a highly interconnected transportation network.

PWD/CDD Medium Implemented through the North Bayshore, East Whisman, San Antonio and El Camino Real Precise Plans.

MOB 1.6.1: Traffic calming. Provide traffic calming improvements through the City’s Neighborhood Traffic Management Program (NTMP). PWD Medium MOB 1.6.2: Neighborhood Traffic Management Program. Update NTMP guidelines to ensure they include up-to-date traffic calming design options. PWD Medium Accessibility
MOB 2.1.1: Sidewalks and lighting. Encourage separated sidewalks and lighting during review of new development projects and significant rehabilitation or expansion projects.

CDD/PWD Medium
Implemented through the North Bayshore, East Whisman, San Antonio and El Camino Real Precise Plans during the development review process.

MOB 2.1.2: ADA & Accessibility. Implement and enforce requirements for ADA and accessibility at public facilities and during review of private development projects (for example, disabled parking, paths of travel, building access, curb ramps, etc.).

CDD/PWD Medium
Public Works would require current standard of ADA features within the public right-of-way. Accessibility on private properties is reviewed by the Building Division.

MOB 2.1.3: Transportation plans. Ensure bicycle, pedestrian, and other transportation plans consider access improvements to public facilities, programs, and services.

PWD Medium Included in the Multimodal Plan.

Page 7 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
MOB 2.1.4: Transit providers. Coordinate with transit providers responsible for implementing accessible transit and paratransit services to accommodate the needs of Mountain View residents.

PWD Medium Mountain View Community Shuttle Pilot Program and Mvgo Commuter shuttle services are in operation.

Walkability
MOB 3.1.1: Pedestrian Master Plan. Regularly update and implement the goals, policies, and actions of the Pedestrian Master Plan. PWD Medium Updating the Pedestrian Master Plan is the responsibility of the B/PAC. Implementation of the action items will likely be accomplished through the annual CIP development and approval process and/or the approval of private development projects.

MOB 3.1.2: Sidewalk database. Maintain a database of missing sidewalk segments and explore opportunities to close gaps in the sidewalk network. PWD Medium MOB 3.1.3: Pedestrian paths. Include publicly accessible pedestrian paths in major new developments and public facilities, and ensure that they are clearly identified and safe.

CDD/PWD Implemented through development review process and policy documents.

MOB 3.1.4: Curbs, gutters, and sidewalks. Implement existing policy to install curbs, gutters, and sidewalks, where desired on unimproved local streets and identify funding for the improvements.

PWD Medium
MOB 3.1.6: Sustainable streetscapes. Consider adopting and/or updating sustainable streetscape standards and guidelines for public improvements and frontage design of private development aimed at creating attractive pedestrian environments, particularly along high-traffic roadways.

CDD/PWD Medium Implemented through development review process and policy documents.

MOB 3.2.1: Connections through superblocks. Develop pedestrian improvement standards aimed at breaking down large blocks, where vehicular intersections are not feasible or desirable.

CDD/PWD Medium Implemented through development review process and policy documents.

MOB 3.2.2: Existing neighborhoods. Identify and enhance pedestrian and bicycle facilities and connections through existing neighborhoods to commercial locations and amenities.

CDD/PWD Medium Implemented through development review process and policy documents.

MOB 3.2.3: Pedestrian crossings to parks. Improve and enhance pedestrian crossings to parks and other public facilities in accordance with current standards and best engineering practices.

PWD/CSD Medium
MOB 3.2.4: Safety and security. Encourage building design features in new developments, such as windows and entries that orient towards public pathways, to improve the safety and security of pedestrians.

CDD High Newly adopted Precise Plans include design standards, to address this in those respective areas.

MOB 3.3.2: Pedestrian connections. Identify and prioritize pedestrian access to connect neighborhood cul-de-sacs and connect neighborhoods to the City-wide trail system.

PWD/CSD Medium
MOB 3.4.1: Roadway reductions. Identify opportunities to reduce roadway widths at specific intersections and along key corridors to enhance pedestrian and bicycle facilities, including landscape amenities.

PWD/CDD Medium

Page 8 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
MOB 3.5.1: Bicycle/Pedestrian Advisory Committee. Support the Bicycle/Pedestrian Advisory Committee (BPAC) work on pedestrian and bicycle facility projects.

PWD High
MOB 3.5.2: Programs to promote walking. Implement new and enhanced sustainability and health programs that promote walking and bicycling. CMO/PWD Medium Bikeability
MOB 4.1.1: Bicycle Transportation Plan. Regularly update and implement a comprehensive Bicycle Transportation Plan (BTP), including identification of projects that extend and improve the on-street bicycle network, and consideration of bicycling mode-share targets to achieve a well-utilized network.

PWD/CDD Medium The Bicycle Transportation Plan (BTP) update was completed in Nov 2015. The B/PAC conducts an annual review of the BTP.

MOB 4.1.2: Funding. Seek funding and revenue sources to install bicycle network improvements and parking. PWD Medium
MOB 4.2.1: Off-street trails. Maintain and extend the City’s off-street trail network to improve bicycle and pedestrian access, including Stevens Creek, Hetch Hetchy Trail, and Permanente Creek Trail.

PWD/CSD Medium Extensions and other improvements are identified, prioritized and funded through the annual CIP development and approval process.

MOB 4.3.1: Public bicycle parking. Enhance the availability of convenient and publicly accessible bicycle parking facilities at transit stations and ensure availability on public and private property at key commercial locations such as Downtown.

PWD/CDD Medium
Ongoing through coordination with transit providers and, for private property locations, by Public Works and Community Development staff during the design review process.

MOB 4.4.2: Bicycle parking innovations. Encourage new and innovative means for complying with bicycle parking and storage requirements. CDD/PWD Medium Implementation is ongoing on a project-by-project basis.

MOB 4.5.1: Bicycle education. Provide bicycle education and promotion programs. PWD High Currently implemented as part of the Safe Routes to School program (currently on hold due to COVID-19).

Transit
MOB 5.1.1: Commuter rail. Actively support commuter rail in Santa Clara County and along the Peninsula. PWD Medium Ongoing, consistent with policy direction from the City Council.

MOB 5.1.2: Light rail. Actively support enhanced existing light rail service to transit-oriented employment centers and residential development in Mountain View.

PWD Medium Ongoing, consistent with policy direction from the City Council.

MOB 5.1.3: Protection from negative effects. Collaborate with service providers in transit planning processes to support designs that address visual, noise, and vibration impacts and avoid creating barriers that divide the community.

PWD/CDD Medium
Ongoing, but may also require additional staff and other resources as new transit projects are proposed (e.g., blended Caltrain operations).

MOB 5.1.4: Caltrans and VTA. Plan for and work with Caltrans and VTA to implement BRT improvements along El Camino Real that reflect the City’s needs and interests.

PWD/CDD Medium
The City Council endorsed dedicated lane configuration on April 21, 2015. No final decision regarding with the BRT project has been made.

Page 9 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
MOB 5.1.5: Transit prioritization. Collaborate with Caltrans and VTA to consider additional signal timing adjustment and transit prioritization to minimize transit delay along El Camino Real, in coordination with service needs of other modes of travel (for example, pedestrian crossing, vehicle travel along corridor, etc.).

PWD Medium
MOB 5.1.6: Transit outreach. Provide informational and promotional support for new and existing transit services. PWD Low
MOB 5.2.1: California High-Speed Rail Corridor. Work with the California High-Speed Rail Authority to provide enhanced pedestrian and bicycle access as well as economic development opportunities along and across the rail corridor.

PWD/CDD Medium
MOB 5.2.2: Community preservation. Support the preservation of the Downtown business district, historic buildings, pedestrian-friendly environment, and adjacent residential character along the rail corridor.

PWD/CDD Medium This is addressed during the development review process.

MOB 5.2.3: Downtown circulation. Support protection of Downtown Transit Center operations and access, Downtown mobility, and Central Expressway level of service from impacts of high-speed rail.

PWD Medium This is implemented through the Transit Center Master Plan.

MOB 5.3.1: City-wide shuttles. Study a possible City-wide shuttle system in coordination with VTA, employers, project developers, and other stakeholders.

PWD High Two new shuttle services recently introduced to City through partnerships in January 2015 (MV Community Shuttle and Mvgo).

MOB 5.3.2: Caltrain and VTA. Work with Caltrain and VTA to maintain and enhance convenient, ADA-accessible train, light rail, bus, and shuttle service.

PWD Medium
MOB 5.3.3: Bicycle amenities. Encourage bicycle amenities and access on public transit. PWD Medium
MOB 5.4.1: NASA/Ames. Partner with NASA/Ames Research Park to plan and fund transportation connections with Mountain View, including potential shuttle, bicycle, and pedestrian connections to Downtown, North Bayshore and East Whisman.

PWD/CDD Medium City or MVTMA could partner with NASA/ Ames in future.

MOB 5.4.2: Shuttle access. Support improvements for continued shuttle access to the Downtown Transit Center and Caltrain. PWD/CDD Medium This is implemented through the Transit Center Master Plan.

MOB 5.5.1: Multi-modal station access. Collaborate with Caltrain, VTA, and the High-Speed Rail Authority to optimize station access for all modes, provide safe routes to transit, and ensure adequate bicycle and automobile station parking.

PWD/CDD Medium This is implemented through the Transit Center Master Plan.

MOB 5.5.2: Caltrain station access. Support Caltrain station improvements identified in the Caltrain Bicycle Access and Parking Plan, and prioritize non-single occupancy vehicle modes of access.

PWD Medium
Safe Routes to Schools
MOB 6.1.1: Funding. Pursue public and private agency grant funding sources for safe routes to schools programs. PWD High The City is using Measure B funding for the Safe Routes to School program.

Page 10 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
MOB 6.2.1: Filling gaps. Identify opportunities to install sidewalks, pathways, and bicycle facilities, which may include right-of-way acquisition, to complete gaps along routes to schools.

PWD Medium Address through CIP Process
MOB 6.3.1: Trail access. Plan and construct school-accessible trailheads or neighborhood access points. PWD Medium Address through CIP Process MOB 6.4.1: Education and outreach. Work with the school districts to develop and distribute safe routes to schools plans and information. PWD High Currently implemented as part of the Safe Routes to School program (currently on hold due to COVID-19).

Vehicle Parking
MOB 7.2.1: Reducing negative effects of parking. Require new parking to be accessed from secondary streets, minimizing the width and number of driveways into a parking facility, and screening parking areas with landscaping or wrapping with active uses.

CDD/PWD Medium Implemented through development review process and policy documents.

Performance Measurement
MOB 8.1.1: Transportation analysis for new development. Coordinate with the Santa Clara County Congestion Management Agency to periodically update the City’s transportation analysis requirements for new development, including evaluation criteria, significance thresholds, and mitigation guidelines for environmental analysis (CEQA/NEPA).

PWD/CDD Medium
PWD staff participates in the monthly meetings of the Systems, Operations and Management (SOMs) Working Group of the VTA CMA.

Greenhouse Gas Emissions and Air Quality
MOB 9.1.2: Greenhouse Gas Reduction Plan. Regularly update the GGRP to address transportation emissions reductions. CDD/PWD Medium Part of GP Subsequent EIR (funded by developers); or other GP EIR updates done on a project-by-project basis. Conduct a GGRP Update in 2017-18
MOB 9.2.1: Mixed-use in higher densities. Seek to create higher-intensity mixed-use districts along transit, bicycle, and pedestrian corridors. CDD/PWD Medium Implemented in the North Bayshore, East Whisman, San Antonio and El Camino Real Precise Plans.

MOB 9.2.2: Alternative modes. Promote walking, bicycling, transit and other highly efficient modes of transportation to reduce per capita vehicle miles traveled.

CDD/PWD High Implemented in the North Bayshore, East Whisman, San Antonio and El Camino Real Precise Plans and the Multimodal Plan.

MOB 9.3.1: Municipal vehicles. Minimize emissions from City-owned and operated vehicles through equipment retrofits, purchasing of more efficient models, changes in operation protocols, or other actions.

FIN/PWD Medium Included in the adopted Municipal Operations Climate Action Plan

(MOCAP).

MOB 9.3.2: Sustainable infrastructure. Support the installation of innovative, sustainable infrastructure for low-emission vehicles (for example, electric charging stations, etc.).

CDD/PWD
Included in the adopted Municipal Operations Climate Action Plan

(MOCAP) and community -wide Climate Protection Roadmap
(CPR).

Vehicles and Roadway System Efficiency
MOB 10.1.1: Congestion. Limit congestion to portions of the transportation network that have the least impact on the City’s residential neighborhoods. PWD Medium

Page 11 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
MOB 10.1.2: Roadway System Management. Use Transportation Systems Management (TSM) principles when considering roadway system improvement projects to improve traffic flow, in balance with the needs of other modes.

PWD Medium
MOB 10.1.3: Roadway improvements. Include roadway operation improvement requirements as part of the review process for new development and significant rehabilitation or expansion projects.

PWD Medium
MOB 10.1.4: Surrounding jurisdictions. Collaborate with surrounding jurisdictions and transit agencies such as VTA to implement intelligent transportation systems and minimize the potential negative impacts on Mountain View from projects in surrounding jurisdictions.

PWD/CDD Medium CDD continues to review environmental documents for projects in neighboring cities when applicable.

MOB 10.2.2: Existing development. Encourage TDM implementation for existing development. CDD Medium Ongoing - implemented on a project-by-project basis.

MOB 10.2.3: Local trip management. Facilitate the formation and foster the success of Transportation Management Associations (TMAs), Business Improvement Districts (BIDs), or other public-private partnerships to help manage vehicle trips at a local level.

CDD/PWD High The TMA has been created, implementation is ongoing.

MOB 10.2.4: Project design. Ensure development project designs support achievement of TDM measures. CDD/PWD Medium Completed through Development Review Process.

Maintenance
MOB 11.1.1: New funding sources. Ensure mobility plans include opportunities for new funding sources to implement system improvements. PWD/CDD High MOB 11.2.1: Pavement Management System. Maintain a Pavement Management System and regularly report on pavement conditions. PWD Medium MOB 11.2.2: Pedestrian facilities. Ensure sidewalks and pathways remain free of obstacles that impair accessibility. PWD High Implementation is ongoing.

MOB 11.3.1: Project funding. Emphasize funding for alternatives to single- passenger vehicle facilities when appropriating money for transportation projects.

PWD Medium
MOB 11.4.1: Demonstration projects. Identify and implement demonstration projects that create system efficiencies and cost savings. PWD Medium City-wide Infrastructure
INC 1.1.1: Infrastructure upgrade. Develop appropriate procedures for upgrades to existing infrastructure. PWD Medium Accomplished as part of the City's annual CIP development and approval process, and periodic Master Plans
INC 1.1.2: Infrastructure replacement. Identify and replace end of life infrastructure as necessary. PWD Medium Accomplished as part of the City's annual CIP development and approval process. Also through periodic Master Plans
INC 1.2.1: Fee structure. Develop and implement a fee structure establishing how the City will share the cost of infrastructure upgrades made necessary by new development.

PWD/FIN Medium Capacity Fees adopted in April 2014. Implementation is ongoing.

Infrastructure and Conservation Element

Page 12 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
INC 1.5.1: Coordination with utilities. Work with utility providers to promote information-sharing and to ensure proper maintenance of utility infrastructure.

PWD Medium
INC 1.6.1: Sustainable materials for maintenance. Research and consider the use of sustainable or green construction materials during maintenance projects.

PWD/CSD Medium Implemented through City's Environmentally Preferable Purchasing Policy.

INC 2.1.1: Water shortages. Be prepared to mitigate water shortages due to drought, disaster, infrastructure failure or other service interruptions. PWD Low Water shortage contingency plans are included in the Urban Water Management Plan (UWMP). City has submitted required service restoration priorities to California Department of Public Health.

Continue to fund and construct water system related CIPs to replace end of service life infrastructure. City code was updated in April 2014 to incorporate a plan for reducing water use during increasing levels of shortage.

INC 2.1.2: Sewer. Mitigate sewer disposal, due to disaster, infrastructure failure, or other service interruption. PWD Low
The City is compliant with the California Integrated Water Quality System that is administered through the State Water Resources Control Board. The City has a Sanitary Sewer System Management Plant that outlines procedures for sanitary sewer overflows and other emergency responses.

INC 2.4.1: Criteria for vulnerable areas. Create specific design criteria for sensitive and vulnerable areas such as the North Bayshore area due to their unique environmental conditions.

CDD/CSD Medium Issues identified in the North Bayshore Precise Plan.

INC 2.4.2: Emergency service restoration plan. Create and maintain an emergency service restoration plan for all critical infrastructure – including potable water, wastewater, storm water, recycled water, telecommunications, energy and streets – in case of disaster, infrastructure failure or other service interruptions.

PWD Low
Water shortage contingency plans are included in the UWMP. The Sanitary Sewer System Management Plan outlines procedures for sanitary sewer overflows and other emergency responses. Recycled water system is currently characterized as an interruptible supply and master planning will determine the optimal level of redundancy.

INC 3.1.1: Monitoring rights-of-way. Prioritize physical improvements to streets, sidewalks and other public rights-of-way based on regular monitoring of their condition.

PWD Medium
INC 3.1.2: Upgrades to unimproved streets. Review policies and procedures for when and how to upgrade unimproved streets, remaining sensitive to the unique character, aesthetics, equity and desires of residents in the City’s different neighborhoods.

PWD Medium
INC 3.1.3: Recycled content paving material. Seek opportunities to use paving material that has recycled content. PWD Medium The City incorporates recycled content material where cost- effective and suitable.

Water, Wastewater and Stormwater
Potable Water Supply
INC 4.1.1: Urban Water Management Plan and Water Master Plan.

Comply with provisions of the City’s Urban Water Management Plan and the Water Master Plan and regularly update them to reflect long-term land use planning decisions.

CDD/PWD Medium
The UWMP is updated every five years. The UWMP was updated in June 2016. Staff will be proposing a Water Master Plan update with the next CIP.

Page 13 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
INC 4.1.2: Groundwater quality and regulations. Closely monitor groundwater quality as well as any changing rules and regulations regarding the City’s access to groundwater, revising plans as necessary to reflect any relevant changes to the groundwater supply.

PWD Medium Testing occurs periodically for compliance with EPA water quality standards.

INC 4.1.3: City reservoir storage. Regularly review reservoir capacity to ensure the City meets recommended storage amounts. PWD Low Water master plans are updated approximately every 10 years to assess capacity. Large developments undergo hydraulic
assessments to ensure that peak and fire flow demands can be met with existing capacity and storage.

INC 4.2.1: Water contracts. Work with other local agencies and water wholesalers to maintain the City’s existing water contracts and Supply Guaranties.

PWD Low
Long term contracts with water suppliers (SFPUC and SCVWD) are in place. Anticipated water deliveries from the Santa Clara are reviewed annually. The water supply agreement with the SFPUC specifies minimum available supplies for the City and plans for water shortages.

INC 4.2.2: Access to imported water supply. Monitor changing rules and regulations regarding the City’s access to imported water supply. PWD Low Public Services monitors water supplies through ongoing wholesaler meetings with the SCVWD and SFPUC.

INC 4.3.1: Water main replacement. Execute the annual water main replacement program and budget. PWD Medium
Annual water main replacement priorities are development from master plan recommendations and monitoring of repair
frequencies. Replacements are prioritized annually and included in the annual CIP.

Water Conservation
INC 5.1.1: Public education. Implement public education programs about water conservation and efficiency, including education at schools. PWD Low PSD staff implemented a water conservation education program (including school education) in coordinating with our regional partners (SCVWD & Bay Area Water Supply and Conservation Agency (BAWSCA)
INC 5.1.2: Large consumers. Target water use efficiency outreach towards larger water customers. PWD Low
PSD staff targeted largest water users between 2007-2010 to promote water conservation. Ongoing outreach is conducted annually.

INC 5.2.1: Incentives and requirements. Create incentives and develop regulations that encourage water use efficiency, water conservation and recycled water use.

PWD/CDD Medium
Rebates and other incentives available for the installation of water efficient devices. MV's water conservation in landscaping regulations, and the Green Building Code both require the use of water efficient practices for new development.

INC 5.7.1: City demonstration projects. Administer demonstration projects

such as water-wise gardens and rain gardens. CSD/PWD Medium This is an ongoing process in cooperation with the Santa Clara Valley Water District. A water wise demonstration was installed in fall 2013. A second demonstration garden was completed for the Library in 2015
Wastewater
INC 6.1.1: Sewer Master Plan. Maintain and update the City’s Sewer Master Plan (SMP) as necessary, to reflect long-term land use planning decisions.

PWD Low
Sewer master plans are updated approximately every 10 years to assess capacity. Large developments undergo hydraulic
assessments to ensure that system capacity is sufficient for peak flows.

INC 6.1.2: Anticipating future wastewater generation. Anticipate future wastewater generation by regularly updating the Sewer Master Plan (SMP) to reflect long-term land use planning decisions.

PWD Low

Page 14 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
INC 6.1.3: Monitoring. Monitor the condition of the sanitary sewer collection system and continue to make improvements by maintaining and updating the Sanitary Sewer Management Plan (SSMP).

PWD/CAO/FIR Medium Public Services is working to update the Sanitary Sewer Management Plan and related ordinances.

INC 6.1.4: Sanitary Sewer Overflows. Maintain programs to prevent sanitary sewer overflows. PWD Medium
INC 6.1.5: Wastewater conveyance outside City limits. Allow conveyance and treatment of wastewater by City infrastructure for the City of Los Altos, portions of Moffett Field and NASA/Ames and other areas outside City limits as mutually beneficial.

PWD/CAO Low The City develops agreements with NASA periodically when needed.

INC 6.1.6: NASA/Ames sanitary sewer discharge. Renew sanitary sewer discharge agreement with NASA/Ames. CAO/PWD Low
INC 6.2.1: Pollution prevention. Actively partner with the Palo Alto Regional Water Quality Control Plant (PARWQCP), implementing policies to control inflow and infiltration sources, and reducing wastewater loading of pollutants, such as metals, pharmaceuticals and other emerging pollutants that may pass through the wastewater treatment system.

PWD/FIR Low Fire and Environmental Protection Division (FED) staff participate in source control planning and training activities.

INC 6.2.2: Industrial pollution control monitoring. Conduct industrial inspection and monitoring programs to ensure that required controls are installed and maintained and that applicable discharge limits are met.

FIR High Mandatory industrial inspection programs are administered by the Fire Department, Fire and Environmental Protection Division.

INC 6.2.4: Commercial pollution control monitoring. Implement commercial inspection programs to control discharges that may create hazardous conditions in the City’s sewer system or may cause sewer overflows.

FIR High Commercial inspection program is administered by the fire Department, Fire and Environmental Protection Division.

INC 6.2.5: Source controls in new development. Control potential pollutant sources from new facilities or developments by requiring source controls during the planning and building plan check review process.

PWD/CDD/FIR Medium Implemented through standard conditions, plan review and inspection.

Recycled Water
INC 7.1.3: Promoting recycled water. Promote additional uses of recycled water within state-approved regulations. PWD Low
Staff will continue to review non-irrigation uses for recycled water.

The current focus is transitioning existing irrigation customers to the recycled water system.

INC 7.1.4: Selling recycled water. Investigate opportunities to sell recycled water to neighboring jurisdictions. PWD/FIN Low
Staff will continue to focus on increasing consumption by internal customers, and reviewing the potential for system expansion within City limits.

INC 7.1.5: Recycled water at NASA/Ames. Support the continued and expanded use of recycled water at NASA/Ames Research Center and Moffett Field.

PWD/CDD Medium
Stormwater
INC 8.1.1: Stormwater Master Plan. Update and maintain the Stormwater Master Plan as necessary. PWD Medium
INC 8.1.2: Upgrade undersized drainage pipes. Provide funding and infrastructure to remove cross culverts. PWD Medium

Page 15 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
INC 8.1.3: Low Impact Development (LID). Maximize opportunities to design and construct LID Stormwater treatment controls at new development and redevelopment projects through efforts to educate developers and project engineers and implementation of the development review process.

FIR/CDD Medium
Fire Department, Fire and Environmental Protection Division implements evaluation and review of the LID requirement.

Municipal Regional Stormwater Permit requirements mandate LID Stormwater controls at new development sites. LID is strictly regulated. LID project data is reported annually to the State of California, regional Water Quality Control Board.

INC 8.1.4: Infrastructure upgrade. Develop appropriate procedures for upgrades to existing infrastructure. PWD Medium
New section in the re-issued Municipal Regional Stormwater NPDES Permit requires the City to develop and implement a long- term green infrastructure plan that will convert a portion of existing City streets to "Green Streets."
INC 8.3.1: Best practices in City operations. Implement pollution prevention Best Management Practices while conducting municipal operations, such as street sweeping, water utility operations, storm drain maintenance and sanitary sewer.

PWD/FIR Medium
Potential new requirements will be evaluated and employees will be trained, if necessary. City staff to monitor BMP changes through continuing education and professional association membership.

INC 8.4.1: Inter-agency collaboration. Participate in the Santa Clara Valley Urban Runoff Pollution Prevention Program (SCVURPPP) and work collaboratively with other permitted agencies to achieve compliance with multiple requirements, such as monitoring and public education, in a cost effective manner.

FIR High
The re-issued Municipal Regional Stormwater NPDES permitwas adopted November 2015 and became effective January 2016. City Council authorized continued participation in SCVURPPP. City staff participate collaboratively with other agencies to comply with requirements collectively, as opportunities allow.

INC 8.4.2: Storm water pollution sources. Conduct inspection programs to identify and eliminate sources of Stormwater pollution. FIR High Mandatory industrial inspection programs are administered by the Fire Department, Fire and Environmental Protection Division.

INC 8.4.3: Pollutants of Concern. Implement programs to minimize potential discharges of pollutants of concern, such as mercury, copper, polychlorinated biphenyls (PCBs), polybrominated diphenyl ether (PBDEs), legacy pesticides, selenium, or other pollutants of concern that may be identified during the timeframe of the General Plan.

FIR High
Long term pollutant load reduction performance criteria for mercury and PCBs are included in the re-issued Municipal Regional Stormwater Permit. A critical component of the load reduction strategy will be long term implementation of green infrastructure projects in the City.

INC 8.4.4: Outdoor water conservation. Minimize overwatering from irrigation systems and encourage outdoor water conservation, which decreases the burden on the Stormwater system.

CSD/PWD High
INC 8.6.1: Emerging technologies. Evaluate and update development and design standards for Stormwater treatment to reflect prevailing or emerging technologies.

FIR/CDD/PWD Medium Stormwater treatment design and specifications are evaluated regarding LID treatment controls and trash capture devices.

INC 8.7.1: Storm inlet stencils. Ensure storm inlets are stenciled with a “No Dumping, Flows to Bay” or similar text to educate the public about storm drain pollution.

PWD/FIR Medium
Solid Waste and Recycling
INC 10.1.1: Zero waste action plan. Adopt and implement a Zero Waste Action Plan. PWD Medium

Page 16 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
INC 10.1.2: Public education. Provide comprehensive and ongoing public education and promotion programs to encourage residents and businesses to reduce waste and participate in recycling programs.

PWD Medium
INC 10.1.3: Large consumers. Target recycling and reuse outreach towards large commercial and industrial customers. PWD Medium
INC 10.3.1: Source Reduction and Recycling Element. Implement the programs described in the Mountain View Source Reduction and Recycling Element (SRRE).

PWD Medium
INC 10.7.1: Recycled content advocacy. Advocate for local, state and federal legislation that will increase use of recycled content products. PWD Medium INC 10.7.2: Recycled content promotion. Educate and encourage residents and businesses to use products with recycled content. PWD Medium INC 10.9.1: Preferential purchasing. Periodically review and update the City’s Environmentally Preferable Purchasing Policy (EP3). FIN/PWD Medium INC 11.2.1: Drop-off site. Maintain a convenient City-operated accessible recycling drop-off and redemption site. PWD High
INC 11.2.2: Recycling receptacle storage. Require adequate, accessible and convenient areas for the storage and collection of recyclable materials in all new developments.

CDD/PWD Medium Implemented through the Development Review Process INC 11.4.1: Refuse disposal capacity. Assure that the City possesses a minimum of five years of refuse disposal capacity at all times. PWD Medium INC 11.6.1: Service pricing. Assess services to ensure they are convenient and competitively priced. PWD/FIN Medium Complete cost of service study completed in FY 2014-2015 Climate Change
INC 12.2.1: Greenhouse Gas Reduction Plan. Adopt and regularly update a City-wide Greenhouse Gas Reduction Plan (GGRP). CDD/PWD Medium GGRP was updated in 2018 and implementation is ongoing.

INC 12.2.2: Tracking emissions. Maintain and update the City’s community-wide and government operations greenhouse gas inventories to track emissions.

CMO Medium GHG inventories are updated and presented to Council on a regular basis.

INC 12.2.3: Emissions reductions. Reduce community-wide and government operations greenhouse gas emissions pursuant to adopted targets.

CDD/PWD High
Implemented through Municipal Operations Climate Action Plan (MOCAP) and community wide Climate Protection Roadmap
(CPR)
Energy Production and Consumption
INC 13.1.1: Building energy conservation and efficiency. Develop and implement a plan to increase energy efficiency and conservation in public buildings and infrastructure.

CDD/CSD/PWD Medium
INC 13.1.2: Efficient City infrastructure. Find opportunities to install more energy-efficient lighting and infrastructure in the public right-of-way and on City- owned properties.

PWD Medium
The City has completed the conversion of streetlights and parking lot lights to LEDs and continues to perform energy retrofits as opportunities arise.

INC 13.3.1: Efficiency in development review. Use the development review process to inform developers of the advantages of energy efficiency in buildings, including passive solar design.

CDD Medium Solar Ready requirement came into effect July 1, 2014. Additional requirements came into effect in 2019.

Page 17 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
INC 14.1.1: Track new renewable energy installations. Institute a process to track the amount of new solar, wind or other types of renewable energy generation permitted yearly.

CDD Medium This data is tracked through the building permit process.

INC 14.1.2: Promoting renewables. Regularly investigate and publicize opportunities for community members or the City to utilize renewable energy technologies such as solar, co-generation or wind.

CDD/PWD Medium Outreach is ongoing when opportunities arise.

INC 14.1.3: Methane extraction. Extract methane gas from the sanitary landfill for energy production. PWD Medium
City staff operate the landfill gas collection and control system continuously to extract methane from the closed Shoreline Landfill as required by the various regulations and permits. The collected landfill gas is sold to Google for use in their co-generation plants near their office buildings; is used by City operated micro turbines to generate electricity for the Flare Station and Pump Stations; or is destroyed at the Flare Station. Public Services Staff continuing to review additional energy generations opportunities.

INC 14.1.4: Renewables in development review. Use the development review process to inform developers of the advantages of renewable energy production, including wind and solar.

CDD Medium This is encouraged by new the North Bayshore, East Whisman, San Antonio and El Camino Real Precise Plans.

INC 14.2.1: Sustainable design. Incorporate sustainable design features into new City facilities. CDD/PWD
INC 14.1.5: Incentives for Renewables. Develop a program of incentives, fee waivers or other strategies to facilitate community members installing renewable energy technologies.

FIN/PWD/CDD Medium
Commercial fee reduction (25%) in place as of September 2015 and Residential fee reduction are also in palce in compliance with AB2188. EV Requirement.

Green Building
INC 15.1.1: Green building requirements. Create and administer community-wide green building requirements. Regularly update them and track development of Leadership in Energy and Environmental Design-New

Construction (LEED-NC), Leadership in Energy and Environmental Design- Neighborhood Development (LEED-ND), Green Point Rated or other relevant green building standards as they relate to the City’s green building objectives.

CDD High
Green building requirements have been created and are being administered. The rest of the action seems to parallel INC 15.1.2 The Mountain View Green Building Code (MVGBC) is updated every 3 years in line with the California Building Code, Title 24 and CalGreen code updates.

INC 15.1.2: Other green building regulations. Monitor state green building requirements such as CalGREEN, as well as any other relevant regional, state or federal standards and requirements and ensure the City’s green building program meets or exceeds these and all applicable standards and regulations.

CDD Medium MVGBC has been updated to incorporated changes at state level.

INC 15.1.4: Staff training. Provide regular staff training on green building practices, regulations and standards. CDD Medium Staff trainings are offered on an as-needed basis.

INC 15.2.1: Visible green technology. Provide public environmental education by integrating visible examples of green technology into public buildings.

PWD/CDD Low Included in Municipal Operations Climate Action Plan (MOCAP).

INC 15.2.2: Green building education. Provide fact sheets and other materials on the City’s web site and at City offices. CDD Medium

Page 18 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
Species and Habitat
INC 16.1.1: Habitat corridors. Identify and preserve wildlife habitat corridors through the City. CSD High
INC 16.1.2: Water replenishment. Enable sufficient surface water replenishment and protect surface water quality to enable groundwater percolation and provide habitat for wildlife.

FIR/PWD Medium
FEPD staff involvement with this item has been through
implementation of LID Stormwater treatment requirement.

Planning staff implements those guidelines through DRP process & coordinates with SCCVWD on new development near waterways.

INC 16.1.3: Water quality. Support efforts by the Santa Clara Valley Water District to preserve water, habitat and riparian quality in the creeks within the City, including implementing the Santa Clara Valley Water Resources Protection Collaborative Guidelines and Standards for Land Use Near Streams.

CDD/PWD/FIR Medium
FEPD staff involvement with this item has been through
implementation of LID Stormwater treatment requirement and other Stormwater pollution prevention programs.

INC 16.1.4: Volunteer creek clean-up. Encourage volunteer creek clean- ups. CSD/FIR High Fire-FEPD coordinates 2 creek cleanup each year (currently on hold due to COVID-19).

INC 16.3.1: Burrowing owl. Evaluate and maintain burrowing owl habitat through the Burrowing Owl Preservation Management Plan (BOPMP). CDD High Staff biologist continues to implement BOPMP and monitors owl population in Shoreline Park.

INC 16.4.1: Invasive species. Identify invasive species and their associated risks, contain these species and reduce their amounts wherever feasible. CSD High Shoreline staff actively removes invasive species when and where possible.

INC 16.5.1: Tidal marshes. Maintain Charleston Slough within Shoreline at Mountain View and creeks as wildlife habitat. CSD/PWD High Staff continues to coordinate with South Bay Salt Pond Restoration Project and with BCDC on Charleston Slough enhancements.

Watershed and Floodplain Management
INC 17.1.1: Inter-agency coordination. Coordinate with the Santa Clara Valley Water District (SCVWD) on flood-related issues. PWD Medium INC 17.1.2: Fee structure. Review and update the procedure and fee structure for the cost of system upgrades made necessary by new development, considering the possibility of new impact and maintenance fees.

PWD/FIN Medium
INC 17.4.1: Flood zones. Continue to review development in areas identified by the General Plan Flood Zone Map and FEMA flood zone maps for compliance with the City’s Drainage and Flood Control Ordinance.

PWD/CDD Medium
Soil and Groundwater Contamination
INC 18.1.1: Enforcing existing regulations. Enforce local codes and support State and Federal regulations to prevent contamination of groundwater resources.

FIR High Fire-FEPD enforces State and local requirements for Underground Storage Tank monitoring systems and inspection.

Page 19 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
INC 18.1.3: Abandoned wells. Support the Santa Clara Valley Water District (SCVWD) to locate and seal abandoned wells in accordance with state standards to protect groundwater quality.

PWD Medium
INC 18.1.4: Monitoring well permitting. Support the Santa Clara Valley Water District (SCVWD) to locate monitoring wells to protect groundwater quality.

PWD Medium
INC 18.1.5: Abandoned sites. Monitor, prevent, and remediate contamination from abandoned sites. PWD/FIR/CMO Low Fire-FEPD only provides oversight for hazardous materials facility closure or dumping response.

INC 18.1.6: Shallow groundwater. Monitor shallow groundwater quality and ensure it meets or exceeds state and federal requirements. FIR/CMO Low State has issued a Low Threat Risk policy that allows for closures of contaminated sites. City is working with Santa Clara County Health and the Santa Clara Valley Water District (SCVWD) to provide to support of their oversight responsibility. It is not the City's responsibility to monitor Water Quality.

FEPD involvement in this action except for hazmat closure or dumping response.

INC 18.2.2: Inter-agency coordination. Provide local information and other assistance to state, regional, and federal agencies that oversee cleanup of groundwater contamination in Mountain View.

CDD/CMO Low
State has issued a Low Threat Risk policy that allows for closures of contaminated sites. City is working with Santa Clara County Health and the SCVWD to provide to support of their oversight responsibility. It is not the City's responsibility to monitor water quality.

INC 18.2.3: Vulnerability study. Support the Santa Clara Valley Water District (SCVWD) vulnerability study. PWD Low
INC 18.2.4: Vapor intrusion. Monitor and address soil quality and incidences of vapor intrusion. CDD/CMO Medium City continues to work with EPA and DTSC , and SCVWD.

Integrated Pest Management
INC 19.1.1: Integrated Pest Management Plan. Maintain and regularly update the City’s Integrated Pest Management Plan (IPMP). CSD/FIR High INC 19.2.1: Pesticide use tracking. Maintain a database to track the amount of pesticides applied at City facilities. CSD/FIR High The Fire Department, Fire and Environmental Protection Division maintains the pesticide use tracking database for pesticide use at City facilities.

Air Quality
INC 20.1.1: Wood-burning ordinance. Enforce the City’s wood-burning ordinance. CDD Low
INC 20.1.2: Air quality through California Environmental Quality Act.

Use the development review process to evaluate the cumulative effects of new development on air quality and impose appropriate mitigation measures through the CEQA process.

CDD Medium This is required under CEQA.

INC 20.2.1: Sensitive receptors. Utilize Bay Area Air Quality Management District (BAAQMD) guidelines to protect residential uses and other sensitive receptors from stationary sources of pollution.

CDD Medium Implemented through development review as a condition of approval.

Page 20 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
INC 20.2.2: Regional Clean Air Plan. Cooperate with the Bay Area Air Quality Management District (BAAQMD) in implementing the regional Clean Air Plan.

CDD Medium
INC 20.2.3: Congestion Management Plan. Work with the Congestion Management Agency (CMA) to implement the Congestion Management Plan (CMP).

CDD/PWD Medium
INC 20.2.4: Regulation of specific businesses. Improve awareness of the Bay Area Air Quality Management District’s enforcement program to regulate specific businesses, especially those near residential neighborhoods.

CDD/CMO Medium
INC 20.3.1: Pollution prevention. Encourage the community and City employees to minimize single-occupancy auto travel through employer incentives and other strategies.

CDD/PWD/CMO Medium NBS PP is implementing a 45% SOV rate.

INC 20.6.1: Conditions for development and grading. Adopt and periodically update standard mitigation measures and development conditions for dust, particulate, and exhaust control standard measures for demolition and grading activities in compliance with the BAAQMD CEQA Air Quality Guidelines.

CDD/PWD
Low
Implemented through project conditions of approval and CEQA mitigation measures.

INC 20.7.1: Protection of sensitive receptors. Adopt procedures to require health risk assessments, emissions analysis and risk reduction plans in accordance with BAAQMD-recommended procedures for sensitive land uses, and establish standard mitigation measures and development conditions to comply with BAAQMD standards.

CDD
Low
Implemented through project conditions of approval and CEQA mitigation measures.

Parks and Open Space
POS 1.1.1: Acquire open space. Acquire and develop open space consistent with the priorities established by the Parks and Open Space Plan (POSP). CSD/PWD High CSD works with PWD to look for and evaluate potential sites for open space on an ongoing basis, focusing on areas identified by the Parks and Open Space Plan as deficient in open space.

POS 1.1.2: Implement park land dedication ordinance. Use the park land dedication provisions of the City’s Subdivision Ordinance to provide land or fees for parks. The requirements are a condition of residential project approval.

PWD/CSD High PWD-LDE staff will continue to collect fees per City Code. Updates are currently underway.

POS 1.1.3: Use creative approaches to increase park land. Use creative and innovative means, such as easements, leases, cooperative agreements and grants from other agencies and organizations, to increase park and open space resources.

CAO/CSD/CDD/PWD This will be addressed with the updated Parkland Dedication Ordinance.

POS 1.1.4: Update Park and Open Space Plan. Update the Parks and Open Space Plan every three years. CSD High
POS 1.1.5: Maintain inventory. Maintain an inventory of public and private properties for potential purchase and redevelopment as public open space.

PWD/CSD Medium
Parks, Open Spaces and Community Facilities Element

Page 21 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
POS 2.1.1: Explore third community park. Explore strategies to build a third community park, north of Central Expressway. CSD Medium CSD works with PWD to look for and evaluate potential sites for open space on an ongoing basis, focusing on areas identified by the Parks and Open Space Plan as deficient in open space.

POS 2.3.1: Ensure safe access across streets and barriers. Utilize the Parks and Open Space Plan, Bicycle Transportation Plan, Pedestrian Master Plan, and other plans, and collaborate with other governmental agencies to ensure that open space resources can be safely accessed across streets and other barriers.

PWD/CSD Medium
POS 2.5.1: Use preservation criteria in Parks and Open Space Plan. Utilize

the POSP’s preservation criteria to evaluate the purchase or preservation of surplus school sites.

CSD/PWD High
CSD works with PWD to look for and evaluate potential sites for open space on an ongoing basis, focusing on areas identified by the Parks and Open Space Plan as deficient in open space.

POS 3.1.1: Develop environmental education programs. Develop environmental education programs, services, and facilities. CSD High The City operates Deer Hollow Farm as part of a partnership with other agencies. Further work will take place on a medium priority for development of environmental education programs at
Shoreline.

POS 3.1.2: Plant native species in natural areas. Plant native and/or drought-tolerant species in natural areas such as the Stevens Creek Trail and Shoreline at Mountain View.

CSD High
The North Bayshore Plant Palette was adopted in 2016. It contains natives and low water use plants. The plant list is used when planting in natural areas.

POS 4.1.1: Notify residents. Notify residents of open space projects. CSD High This is done on an ongoing basis.

POS 4.2.1: Design for safety. Design for park safety and security. CSD/PWD High CSD works with the PWD and the PD as needed to design new parks and facilities that are safe.

POS 4.2.2: Consider neighbors. Recognize and respect the need for privacy and security of neighboring residents when developing parks, trails, and other open spaces.

CSD/PWD High
The need for privacy and security of neighboring residents is always considered when developing parks, trails, and other open spaces.

POS 5.1.1: Schools as neighborhood centers. Collaborate with the Mountain View Whisman school district to explore using school sites as neighborhood centers. The centers could provide out-of-school activities, family programming and services, intergenerational activities and neighborhood events.

CSD High Collaboration is ongoing.

POS 5.1.2: Mountain View High School open space joint use. Explore development of an agreement with the Mountain View-Los Altos Union High school District for joint use of the open space at Mountain View High School for public use.

CSD Medium
Programs and Services
POS 7.1.1: Develop programs for all ages and abilities. Develop programs and activities for residents of all ages and ability levels consistent with the City’s Recreation Plan and Youth Action Plan.

CSD/LIB High
The City currently operates programs for all ages from infants to seniors consistent with the Recreation Plan and Youth Action Plan.

The Library offers a variety of ongoing programs for children, teens, adults, and families.

Page 22 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
POS 7.1.2: Develop diverse programs. Create planning programs relevant to the City’s cultural diversity. CSD/CMO/LIB Medium
HRC contiuously supports diversity outreach. The Library continues to develop programs for our diverse community, including computer training in Spanish for adults, and family storytimes in Spanish and Chinese.

POS 7.1.3: Develop community facilities. Develop safe and attractive facilities for adolescents and young adults, seniors, and other populations with special needs, throughout the community.

CSD/PWD High The Teen Center project was completed in 2014.

POS 7.1.4: Work with City commissions and committees. Work with the Parks and Recreation Commission (PRC), Senior Advisory Committee (SAC), and the Youth Advisory Committee (YAC) on recreation programming.

CSD/CMO High
POS 7.1.5: Improve technology. Consider innovative technological improvements and strategies that will serve diverse future community needs.

CSD/CMO/LIB/IT High
The Community Services Department has upgraded the
registration system to provide off-site registration at the pools as well as membership modules for the Senior Center and Teen Center as well as a reservation booking system for the Rengstorff House.

POS 7.1.6: Accessing City services. Explore strategies to make accessing City services easier and more user-friendly. CMO/CSD Low New website significantly improves access; utility billing online - 2013. New website and associated digital/social communication channels improves access; utility billing online. An online permitting systems has been implemented during 2020.

POS 8.1.1: Improve access. Collaborate with public and private entities to improve access to child care. CMO/CSD Low
New Child Care provider (Learning Links) selected in 2014. More centers opened in the past 2 years. Child Care Provider support for training referrals, industry best practices and customer resources.

POS 8.1.2: Connect providers and clients. Utilize Santa Clara County’s Local Needs Assessment for Child Care to connect child-care providers with client populations.

CMO/CSD Medium Updated Need Assessment was completed in 2013, shared with Planning staff and new providers that inquire.

POS 8.1.4: Integrate child care into other uses. Encourage and support integration of child-care facilities with transit trips and within large development projects.

CMO/CDD Medium
POS 8.1.5: Support operations. Provide support and information that enhance child-care provider operations. CMO/CDD/CSD Medium Website update with provider links. Recently completed a workforce survey for private providers.

POS 8.1.6: Provide references. Maintain and make available a reference and referral list of center-based and family child care providers in the City. CMO Medium POS 8.1.7: Enhance quality and standards. Participate in local efforts to enhance child-care quality, and community care licensing standards. CMO Medium POS 8.1.8: Promote accessibility and affordability. Work with the Mountain View Whisman School District to continue making preschool and after-school child-care accessible to low-income families and available on school campuses.

CSD/CMO High

Page 23 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
Arts
POS 10.1.1: Maintain Mountain View Center for the Performing Arts.

Maintain the Mountain View Center for the Performing Arts as an important community resource.

CSD/CMO High Part of the ongoing operations of the Performing Arts Center POS 10.1.2: Utilize Performing Arts Committee. Utilize the Performing Arts Committee (PAC) to support programs and operations of the Mountain View Center for the Performing Arts, to advocate for the arts in public venues and to promote music, theater, dance, and other performing arts.

CSD High Part of the ongoing operations of the Performing Arts Center POS 11.1.1: Encourage public art. Encourage public art to be included within public and private development projects, with specific emphasis in key planning areas identified for significant change.

CDD/PWD Low C.I.P's include a process for public art. Public Art is also reviewed through private development review process.

POS 11.1.2: Acquire public art. Retain and develop programs to acquire significant works of public art by supporting the One Percent for Art Program and the Public Arts for all Capital Improvement Projects.

CDD/CSD Implemented by the Viscual Arts Committee
POS 11.1.3: Maintain Visual Arts Committee. Maintain the Visual Arts Committee (VAC) to guide the acquisition of public art and promote other visual arts programs.

CDD Low Implemented by the Viscual Arts Committee
Trees, Gardens and Landscaping
POS 12.1.1: Maintain tree inventory. Maintain a comprehensive inventory of street trees and trees in public spaces in order to determine where to allocate resources to maintain or replace trees.

CSD High
The Community Tree Master Plan was adopted by Council in September 2015. The plan requires maintenance of the urban forest inventory. Staff will also be providing the 5 year update to the 2015 Community Tree Master Plan in FY 21-22.

POS 12.1.2: Publicize tree ordinance. Publicize and enforce the Heritage Tree Ordinance. CSD High Information is provided on City website and sent to all residents in The View.

POS 12.1.3: Identify funding source. Identify a funding source to assist lower-income property owners with maintaining Heritage trees on their property.

CSD Low
POS 12.2.1: Increase number of trees. Work towards having trees on at least 90% of identified and available street tree planting sites. CSD/PWD Medium CSD continues work on increasing street tree inventory and CDD on development projects. In Januray of 2019 the newly created Forestry Coordinator position was filled. The position is focused on filling street tree locations and working with citizens to fill street tree locations.

POS 12.4.1: Require compliance with water conservation standards.

Require new landscaping to comply with City water conservation standards and requirements.

CDD/PWD Medium New parks meet the water conservation and landscape standards through the design process.

Noise
Noise Element

Page 24 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
NOI 1.1.1: Noise Ordinance. Update and enforce the City’s Noise Ordinance to be consistent with this Element. The update shall include noise performance standards for stationary noise sources, including, but not limited to, mechanical equipment, loading/unloading activities, amplified music, and light industrial operations.

CAO/CDD Medium
CAO drafted a memorandum to Council summarizing the City's current noise enforcement regulations (which are not centrally codified, but spread throughout the City Code) but received no direction from Council to update any of these provisions. CAO received no direction from Council to update any of the noise regulations. The current noise ordinance is enforced through the building permit review process.

NOI 1.2.1: Disclosures for mixed-use development. Require disclosures to residents of new mixed-use developments of potential noise associated with adjacent uses such as solid waste/recycling collection, deliveries and other activities typically associated with commercial activity.

CDD/CAO Low Implemented as a condition of approval.

NOI 1.2.2: Disclosures for new development. Require disclosures to residents in new developments of potential noise associated with nearby freeways or highways.

CDD/CAO Low Implemented as a condition of approval.

NOI 1.6.1: Traffic noise reduction measures. Investigate and implement measures and techniques to reduce traffic noise such as repaving roadways or reducing speeds.

CDD/PWD Medium
NOI 1.6.2: Traffic noise reduction process. Monitor and record noise complaints related to traffic noise and coordinate with the Santa Clara Valley Transportation Authority (VTA) Noise Reduction Screening Program to reduce noise.

CDD/PWD Medium
NOI 1.6.3: Truck traffic. Encourage a limitation on commercial, industrial and construction truck traffic through residential areas by measures such as requiring truck traffic routes and traffic plans be identified for new construction and new commercial and industrial uses.

PWD/CDD Medium City has existing approved "trucks routes" per City Code and requires haul route and traffic control plans with all projects.

NOI 1.7.1: Noise complaints. Respond to noise complaints by monitoring the source, suggesting noise mitigation measures, and using enforcement options when necessary.

CAO/ POL/ CDD
Police and Code Enforcement are the primary responders to noise complaints and will continue to operate in this capacity. CAO provided Council with memo on noise regulations and enforcement

in the City but received no direction from Council to change the current approach.

NOI 1.7.2: Shoreline Amphitheatre. Plan for and manage noise from Shoreline Amphitheatre operations. CDD/CSD/POL Medium Noise associated with events is managed through the Temporary Use Permit process.

NOI 1.8.1: NASA overflights. Encourage and coordinate with NASA to minimize flights over the community, including managing practice landings, particularly during evening and nighttime hours.

CDD/CMO Medium The City coordinates with Moffett Federal Airfield in accordance with existing operations.

NOI 1.8.2: NASA noise levels. Encourage and coordinate with NASA to utilize flight, landing, and maintenance procedures which lower noise levels.

CDD/CMO Medium The City coordinates with Moffett Federal Airfield in accordance with existing operations.

Page 25 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
NOI 1.8.3: Moffett Federal Airfield uses. Support efforts to restrict the use of Moffett Federal Airfield for additional air traffic uses such as passenger and cargo uses.

CDD/CMO Medium The City coordinates with Moffett Federal Airfield in accordance with existing operations.

NOI 1.8.4: Moffet Federal Airfield noise contours. Consider the noise contours of Moffett Federal Airfield operations when making land use planning decisions and considering new development to ensure that noise standards are met.

CDD Medium This is implemented through project complience with Moffett Federal Airfield Comprehensive Land Use Plan (CLUP).

NOI 1.9.1: Rail corridors. Monitor plans and projects, which would increase the noise from rail corridors, evaluate their noise impacts, and seek mitigation for any change that worsens local conditions.

PWD/CMO Medium
NOI 1.9.2: High-speed rail. Coordinate with the California High-Speed Rail Authority to reduce the noise impacts of the proposed High-Speed Rail Service.

PWD/CDD Medium
NOI 1.9.3: Light and heavy rail vibration. Monitor vibration caused by light and heavy rail using Federal guidelines for determining impacts. CDD/PWD Medium As part of CEQA review of development projects, analyze vibration caused by light and heavy rail using Federal guidelines for determining impacts.

NOI 1.9.4: Light rail. Monitor regional plans for light rail facilities in Mountain View to ensure that noise impacts are identified and mitigated. PWD Medium NOI 1.9.5: Air horns. Seek the cooperation of transit agencies to avoid unnecessary and prolonged use of air horns except for safety purposes. PWD Medium NOI 1.9.6: Train noise legislation. Support legislation to reduce the noise level of trains. PWD Low
Public Safety Element
Police and Fire Services Combined
PSA 1.1.1: Share Police and Fire services. Work with neighboring cities to evaluate possible efficiency and cost savings from sharing services. POL/FIR High Police
PSA 2.2.1: Prompt notification. Notify residents and others in a timely manner of criminal activity that may potentially affect them. POL High The City uses Press Releases, Print Media, Social Media, and SCC Emergency notification systems for this purpose
PSA 2.3.1: Improve officer skills. Continuously develop and improve the skills and abilities of all members of the Police Department through training and education.

POL Medium The Police Department provides regular staff trainings.

PSA 2.3.2: Embrace technology. Embrace new technology that will help prevent and solve crimes. POL Medium The Police Department continually looks for and evaluates technological solutions
PSA 2.4.1: Support Police Activities League. Provide support to the Mountain View Police Activities League via volunteered staff time and referrals.

POL High This is an ongoing strongly supported program within the Police Department.

PSA 2.6.1: Police service levels and facilities. Periodically review Police Department service levels and facility needs based on the most recent City studies and recommendations.

POL
Medium
Fire and Hazardous Materials
PSA 3.1.1: Use fire suppression best practices. Evaluate and update best practices, plans and policies for preventing and suppressing fires. FIR High

Page 26 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
PSA 3.1.2: Provide excellent equipment. Equip Firefighters with state-of- the-art equipment and training to respond quickly and effectively to medical emergencies.

FIR High
PSA 3.1.3: Adopt codes. Adopt and enforce proactive fire and life safety codes. FIR/CDD High Codes are updated every three years.

PSA 3.1.4: Continue fire inspections. Maintain proactive and responsive programs for fire inspections and code enforcement. FIR High PSA 3.2.1: Incorporate latest technology and training. Keep abreast of new technology and training to manage and control hazardous materials. FIR High Starting in 2015 we have updated our monthly hazmat training to reflect new standards.

PSA 3.2.2: Enforce hazardous materials ordinances. Update and enforce local ordinances regulating the storage, use, handling, and clean-up of hazardous materials and contaminated sites.

FIR High
PSA 3.3.1: Regulate new hazardous materials uses. Review, monitor, and place appropriate conditions on new development that propose hazardous material use.

FIR High This is managed through new construction/tenant improvement permit process.

PSA 3.4.1: Monitor remediation of federal Superfund sites. Monitor environmental remediation activities at federal Superfund sites within or adjacent to the City of Mountain View and ensure development in areas contaminated by federal Superfund sites implement appropriate measures to protect human health and the environment.

CDD/CMO High
Emergency Preparedness
PSA 4.1.1: Maintain public safety operations during disaster. Maintain emergency operations sufficient for public safety during a disaster. This applies to facilities, equipment, communications systems and personnel, even when mutual aid is unavailable. Opportunities for public safety workers to live in Mountain View, as provided for in the Housing Element, will assist in ensuring the availability of adequate personnel.

FIR/POL/PWD This is part of the City's Emergency Plan.

PSA 4.1.2: Conduct practice drills. Conduct practice drills at least annually for City employees assigned to the City’s disaster response team. FIR Exercises are conducted at least annually for all Emergency Operations Center (EOC) staff.

PSA 4.1.3: Work with Moffett Field. Collaborate with Moffett Field in emergency preparedness planning efforts. FIR OES coordinates with Moffett Field on a regular basis PSA 4.1.4: Plan for damaged utility lines. Develop response plans for disasters created by damage or failure of major gas and electric transmission lines.

FIR/PWD This is part of the City's Emergency Plan.

PSA 4.1.5: Evacuation plans. Emergency preparedness plans should consider priority evacuation routes taking into account areas and roadways that are more susceptible to earthquakes and liquefaction, flooding and other disasters or emergencies.

FIR This is part of the City's Emergency Plan.

PSA 4.2.1: Enforce building codes. All development and construction proposals shall be reviewed by the City of Mountain View to ensure conformance to current and applicable building and fire code standards.

CDD/FIR High Implemented through the Building Permit process.

Page 27 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
PSA 4.2.2: Develop a mitigation plan. Develop a Local Hazard Mitigation Plan. FIR The Local hazard Mitigation Plan is updated every 5.

PSA 4.2.3: Involve employers. Work with large employers in the City’s industrial and office areas to prepare a coordinated response in the event of a disaster.

FIR OES continues to work with large employers to provide training and ensure coordination for disaster response
PSA 4.2.4: Educate the community. Educate the community on Community Risk Reduction and increase emergency preparedness. FIR OES provides neighborhood training on request and continues outreach efforts to reach as many neighborhoods, associations, schools and other organizations as possible.

PSA 4.2.5: Work with neighborhoods. Support and involve neighborhoods

and work with the Community Emergency Response Team to develop emergency response plans.

FIR
OES coordinates with existing CERT neighborhoods through quarterly meeting with neighborhood CERT coordinators and provides continuing education training at least quarterly. OES also works to create new CERT neighborhoods. As of 11/1/16 there are 1,337 CERT graduates
PSA 4.2.7: Geotechnical studies. Adopt and periodically update a set of standard mitigation measures and development conditions related to geotechnical/soils investigation and environmental site assessments.

CDD
Low
Implemented as a condition of approval and CEQA mitigation measure.

PSA 4.2.8: Hazardous materials contamination. Adopt and periodically update a set of standard mitigation measures and development conditions to reduce the potential for contamination associated with hazardous materials related to areas adjacent to highways or previously used for agriculture or industrial uses.

CDD
Low
Implemented as a condition of approval and CEQA mitigation measure.

PSA 5.1.2: Upgrade Public Buildings. Replace or upgrade City-owned buildings and structures to meet seismic building codes. PWD/CSD High PSA 5.1.3: Hazard Studies. Review development projects in potentially seismic areas to ensure that geotechnical investigations are prepared following State guidelines and relevant local codes.

CDD Medium Implemented as a condition of approval and CEQA mitigation measure.

Greenhouse Gas Reduction Program Actions
Measure E-1.1: Residential Energy Efficiency Retrofit B: Leverage Energy Upgrade California outreach and educational materials, and Power Saver loans when made available, to encourage energy efficiency retrofits and the use of energy efficient, low-carbon, or renewable technologies CDD Medium
While most information is available on the website, and is regularly published in The View, the City also conducts an outreach program that provides enhanced information that summarizes incentives and relevant programs.

Measure E-1.1: Residential Energy Efficiency Retrofit C: Support Association of Bay Area Governments (ABAG), PG&E, and other organizations’ efforts to develop and implement an Energy Upgrade California program for residential property owners
CDD Medium
Measure E-1.2: Non-Residential Energy Efficiency Retrofit A: Encourage the development of a non-residential PACE financing program (AB 811) to encourage investment in energy efficiency retrofits in non-residential properties
CDD High
PACE financing has been available for non-residential customers through the CaliforniaFIRST Program since September 2012, and is also available through HERO as of September 2015.

Measure E-1.2: Non-Residential Energy Efficiency Retrofit B: Encourage small businesses to participate in PG&E programs that provide technical assistance and access to incentives for energy efficiency upgrades (e.g., refrigeration, HVAC, lighting)
CDD Medium

Page 28 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
Measure E-1.3: Non-Residential Lighting Retrofit A: Enforce the Building Code to require all non-residential tenant improvements to improve lighting per current adopted Mountain View Green Building Code.

CDD High Standards ware updated every 3 years.

Measure E-1.3: Non-Residential Lighting Retrofit B: Encourage small businesses to participate in PG&E programs that provide technical assistance and access to incentives for energy efficiency upgrades (e.g. lighting)
CDD Medium
Measure E-1.4: Residential Energy Star Appliances A: Leverage the Energy Upgrade California platform to promote Energy Star appliances and electronics
CDD Low
Measure E-1.4: Residential Energy Star Appliances B: Collaborate with PG&E, SCVWD, and other non-profit organizations to promote existing financial incentive programs to encourage voluntary replacement of inefficient appliances with new Energy Star appliances
CDD Medium The City has conducted outreach with enhanced information that summarizes incentives and relevant programs.

Measure E-1.5: Smart Grid C: Update the Green Building Code to require smart grid energy management and compatible hearing, ventilation, air conditioning, and lighting in new construction
CDD High
Measure E-1.6: Exceed State Energy Standards in New Residential Development A: Ensure compliance with City’s adopted energy efficiency requirements
CDD High
Measure E-1.7: Exceed State Energy Standards in New Non-Residential Development A: Ensure compliance with City’s adopted energy efficiency requirements
CDD High
Measure E-1.8: Building Shade Trees in Residential Development B:

Develop an outreach program to encourage residents to plant shade trees on private property
CDD Medium Information is included in the SFR Handbook
Measure E-2.4: Non-Residential Solar Photovoltaic Systems C: Encourage the development of a non-residential PACE financing program (AB 811) to encourage non-residential property owners to invest in renewable energy systems
CDD Medium
PACE financing has been available for non-residential customers through the CaliforniaFIRST Program since September 2012, and is also now available through HERO as of September 2015.

Measure E-2.5: Landfill Gas to Energy A: Continue to operate the Shoreline Landfill gas to energy generation systems PWD Medium The City operates two landfill gas fired 65KW Capstone micro turbines at Shoreline Park. The micro turbines provide electricity to the Flare Station, Sewage Pump Station and Irrigation Pump Station. The remaining landfill gas is being sold to Google or destroyed by the Flare Station. The City has a fifteen year contract with Google to supply landfill gas for their co-generation plants located at their office complexes.

Page 29 of 30 ends

Exhibit C

ACTION ITEM RESPONSIBLE /LEAD

DEPARTMENT PRIORITIZATION NOTES
Measure E-2.5: Landfill Gas to Energy B: Work with landfill-gas end users to evaluate potential for developing combined heat and power systems PWD Low Google Corporation has the right to use the landfill gas extracted by the City from Shoreline Landfill for their co-generation plants.

Google power plants are co-generation plants that use power and waste heat from the generators. The remaining supply of gas is inadequate to support additional gas to energy systems.

Measure E-4.1: Energy Efficiency in Streetlights and Traffic Lights A:

Identify and prioritize municipal parking garages for lighting upgrades PWD/CDD Medium Implemented through the Municipal Operations Climate Action Plan.

Measure E-4.1: Energy Efficiency in Streetlights and Traffic Lights D:

Install high-efficiency lighting in all City-owned parking facilities PWD/CDD Medium Implemented through the Municipal Operations Climate Action Plan.

Measure S-1.1: Implementation of Zero-Waste Plan A: Implement Zero- Waste Plan PWD Medium
Measure T-1.1: Transportation Demand Management B: Enforce compliance with TDM Plan and TDM Performance Report requirements CDD High Ongoing - implemented on a project-by-project basis Measure T-1.1: Transportation Demand Management C: Facilitate development of Transportation Demand Management Association(s) and business community membership
CDD High Ongoing - implemented on a project-by-project basis