Attachment 2
Active CIP Projects with Bike and/or Pedestrian Improvements Project Title (#CIP) Bike/Pedestrian Element Status
Anticipated
Construction
Timeline Comments
El Camino Real Pavement
Resurfacing
• Bike lanes
• Mid-block pedestrian crossings
• Replace curb ramps
Design Begin: early 2023
Complete: fall
2023
Caltrans project
Shoreline/Villa Signal
Improvement, Project 16-27
• Protected left turn phases to
eliminate vehicles/pedestrian
conflicts.
• Removal of free right lane from
WB Villa Street to NB Shoreline
Blvd.
• New crosswalk on the north side
crossing Shoreline Blvd.
• Enhanced crosswalk striping and
signage.
• Sidewalk and curb ramp
improvements.
Construction Complete: summer
2022
Federal HSIP grant and TDA
grant funded.
East Whisman Area Transit-
Oriented Development
Improvements, Phase II: Ellis
Street Improvements, Project
16-48
• High visibility crosswalk and
shortened crosswalks.
• Multi-use path on the west side
o
f Ellis Street between Fairchild
Drive and Manila Avenue.
Design Begin: fall 2022.
Complete: fall
2023.
Construction phase funding
pending Council approval in
June 2022.
Shoreline Boulevard at Highway
101 Bicycle and Pedestrian
Bridge, Project 16-60
• Two-way cycle track and
walkway bridge between Terra
Bella and Pear Avenue over
Highway 101.
Preliminary
Design
Begin: spring 2025.
Complete: spring
2026
Project Title (#CIP) Bike/Pedestrian Element Status
Anticipated
Construction
Timeline Comments
Shoreline/Church-Latham
Intersection Signal
Improvements, Project 17-27,
19-27, 20-27, 21-27
• Protected left turn phases to
eliminate vehicles/pedestrian
conflicts.
• Reconstruct median for more
available crosswalk area.
Design Begin: fall 2022
Complete: summer
2023
Partially funded with Vehicle
License Fee – 2010 Measure B
funds
Stierlin Road Bicycle and
Pedestrian Improvements,
Project 17-41
• Protected intersection
• Buffered Bike Lane
• High visibility crosswalks
• Mid-block pedestrian crossing
• Improved lighting, traffic calming
Design Begin: early 2023
Complete: fall
2023
Funded by Federal grant.
Includes Shoreline Blvd
between Montecito Avenue
and W. Middlefield Road.
Rengstorff Avenue Grade
Separation, Project 17-37
(Preliminary Engineering and
Environmental), 22-27 (Final
Design and ROW)
• Class IV bikeways on Rengstorff
between Stanford and Central
Expressway
• Bike/ped overcrossing between
Rengstorff Park and west side of
Rengstorff Avenue
• Widened sidewalks
Preliminary
Design
Begin: early 2025
(pending funding
availability).
Complete: 2027
Measure B funded.
Rengstorff/Latham -Church
Signal Improvements 18-27 and
22-15
• Protected left turn phases to
eliminate vehicles/pedestrian
conflicts.
• High visibility crosswalks.
• Bike enhancements include
green bike skip boxes
approaching along Rengstorff,
and a bike crossing at the
intersection along the west side
of Rengstorff.
Design Begin: early 2023
Complete: fall
2023
Partially funded with Vehicle
License Fee – 2010 Measure B
funds
Project Title (#CIP) Bike/Pedestrian Element Status
Anticipated
Construction
Timeline Comments
Grant Road and Sleeper Avenue
Intersection Improvements,
Projects 18-68 (Study), 21-39
(Design and Construction)
• Installation of a Pedestrian
Hybrid Beacon (PHB)
• High-visibility crosswalk across
the southern leg of Grant Road
with left turn restriction from
Sleeper Avenue.
• Bike improvement crossing
Grant Road.
• New and enhanced crosswalk
striping and signage. ADA
compliant curb ramps.
Study
Completed
Begin: fall 2023
Complete: spring
2024
Bernardo Avenue
Undercrossing, Project 18-69
• Bike/ped undercrossing of
Caltrain rail and Central
Expressway
• Bicycle access improvements
within 500 feet of approaches
Preliminary
Design and
Environmental
Begin: 2025
Complete: 2027
Measure B funded. Caltrain is
project lead for design and
construction. Collaboration
between Mountain View,
Sunnyvale, VTA, Caltrain and
County.
Cross Culvert Removal, Project
19-49 (Dana Street between
Oak Street and Franklin Street)
• High visibility crosswalks
• ADA-compliant curb ramps.
Design Begin: spring 2023
Complete design:
fall 2023
El Monte Corridor
Improvements, Projects 19-61
(Study), 21-38 (Design and
Construction)
• Complete streets study.
• New and enhanced crosswalks
with lighting, striping, and
signage.
• Enhanced bike facility.
• ADA compliant curb ramps.
Study Begin: spring 2024
Complete: end of
2024
SR 237/Middlefield Road
Interchange Improvements,
Project 19-65
• ADA-compliant curb ramps
• High visibility crosswalks
• Class IV bikeways on Middlefield
Road between Ferguson Drive
and SR 237 eastbound on- and
off-ramps.
Preliminary
Design
Begin: summer
2024
Complete: spring
2025
Measure B funded.
Project Title (#CIP) Bike/Pedestrian Element Status
Anticipated
Construction
Timeline Comments
Miramonte Avenue Pavement
Improvements, Project 20-01
• Class II bike lanes on Miramonte
between Cuesta and Hans
• Two-way Class IV bike lane on
northbound Miramonte
between Hans and Castro.
• Bulb-out and led-enhanced
crosswalk system at Hans
Avenue.
Design Begin: summer
2023
Complete: end of
2023
Plymouth Street/Space Park
Realignment, Project 20-40
• High visibility crosswalks
• Two-way bikeway on Shoreline
Boulevard between
Plymouth/Space Park and Pear
Avenue
• Class II bikeways on Plymouth
between Joaquin and Shoreline.
Design Begin: fall 2023
Complete: summer
2024
Calderon Ave Bike Lane
Improvements, Mercy St to El
Camino Real, Project 20-47
• Class II bike lanes along Calderon
Ave
• High visibility crosswalks at
intersection of Church St and
Calderon Ave
Construction Completed in
December 2021
Street Resurfacing, Project 21-
01 (Leong Drive and Fairchild
Drive)
• Bike lanes. Design Begin: fall 2022
Complete: early
2023
Measure B funded.
Annual Sidewalk and Curb
Repairs, Project 21-06
• Repair sidewalks and install 9
curb ramps throughout the City.
Design Begin: fall 2022
Complete: early
2023
Street Lane Line and Legend
Repainting, Project 21-12
• High visibility crosswalks around
City of Mountain View schools.
Design Begin: spring 2023.
Complete: fall
2023
Project Title (#CIP) Bike/Pedestrian Element Status
Anticipated
Construction
Timeline Comments
SB-1 Streets Project, Project 21-
30 (Velarde, Pamela, Bay,
Doverton, Katrina, Fairbrook)
• High visibility crosswalks. Design Begin: early 2023.
Complete: end of
2023
Transit Center Grade
Separation and Access Project,
Project 21-35
• Shared-use path underneath the
Evelyn Avenue ramp to Shoreline
• Bike/ped undercrossings
between northside of Central
Expressway and Transit Center
and Downtown.
• Bikeways and high-visibility
crosswalks within project limits.
Design Begin: early 2025
(pending funding
availability).
Measure B funded.
Bicycle/Pedestrian
Improvements, Project 21-37
(Shoreline Blvd from Wright
Avenue to Villa Street)
• Reconstruct bicycle and
pedestrian pathway on east side
of Shoreline Blvd.
• ADA-compliant curb ramps
• Pathway lighting
Design Begin: summer
2023
Complete: early
2024
$2M grant funding by One Bay
Area Grant Program.
California Complete Streets,
Project 21-40
• Vehicle lane reduction from four
lanes to three lanes
• Parking-protected bike lanes
• Bulb-outs, midblock crossings,
protected intersection
treatments and enhanced
lighting.
Design Begin: fall 2023
Complete: early
2024
Crittenden Lane
Reconstruction, Project 21-41
• Bike facilities
• ADA-compliant curb ramps
Design Begin: early 2024
Complete: fall
2024
Project Title (#CIP) Bike/Pedestrian Element Status
Anticipated
Construction
Timeline Comments
Castro Street Curb Ramp,
Project 20-30
• Replace curb ramps in
Downtown section of Castro
Street
Design Begin: fall 2022
Complete: spring
2023
Annual Traffic Studies/NTMP
Improvements/Bicycle Counts,
Project 20-15
• NTMP Study Study Pending Study
Completion
Latham Street being studied
for NTMP Improvements.