DATE:
April 12, 2022
CATEGORY:
Consent
DEPT.:
Public Works
TITLE: 535 Walker Drive, 400 San Antonio
Road—Accept Public Improvements
RECOMMENDATION
1. Accept the public improvements for the development at 535 Walker Drive for maintenance throughout their useful life.
2. Accept the public improvements for the development at 400 San Antonio Road for maintenance throughout their useful life.
BACKGROUND AND ANALYSIS
“Acceptance” of developer-installed improvements signifies that the developer has satisfactorily completed improvements in the City’s right-of-way. Once accepted, the City takes ownership of and maintenance responsibility for the improvements.
535 Walker Drive
This development project included a new 58-unit rowhouse complex and four common lots for private streets and open space . The public improvement plans for this development were approved for construction on November 19, 2019.
The public improvements include:
Quantity Unit Item Description
5 EA City Monuments
4 EA Storm-Drain Manholes
60 LF 15” Storm Line
1 EA Sanitary-Sewer Manhole
535 Walker Drive, 400 San Antonio Road—Accept Public Improvements April 12, 2022
Quantity Unit Item Description
380 LF 8” Water Service
3 EA Fire Hydrants
2 EA Blowoff valves
3 EA 6” Gate Valves
6 EA 8” Gate Valves
58 EA 1” Water Meters
35 LF 2” Water Line
1 EA 1.5” Water Meter
1,240 SF Sidewalk
40 SF Driveway
3 EA ADA Curb Ramps
400 San Antonio Road
This development project included a new 583-unit apartment complex with ground -floor commercial space in three buildings over an underground parking garage . The public improvement plans for this development were approved for construction on August 1, 2017.
The public improvements include:
Quantity Unit Item Description
45 LF 8” Fire Water Line
50 LF 6” Fire Water Line
2 EA Fire Hydrants
1 EA 2” Water Meter
25 LF 2” Water Service
1 EA 4” Water Meter
40 LF 4” Water Service
535 Walker Drive, 400 San Antonio Road—Accept Public Improvements April 12, 2022
Quantity Unit Item Description
2 EA 6” Water Meters
40 LF 6” Water Service
1 LF 4” Gate Valve
3 EA 6” Gate Valves
1 EA 8” Gate Valve
210 LF 15” Storm Drain Lateral
75 LF 18” Storm Drain Lateral
1 EA Storm Drain Manhole
1 EA Storm Drain Curb Inlet
3 EA Sanitary-Sewer Manholes
26 EA Street Trees
3,120 SF Sidewalk
40 SF Driveway
1 EA ADA Curb Ramp
The public improvements for the se two development project s have been completed to the satisfaction of the City Engineer and are in accordance with the City’s standard policy to accept the improvements for maintenance.
FISCAL IMPACT
The public improvements for each of the development s were paid for by the respective developer.
ALTERNATIVES
Determine that the recommended improvements are not complete or in conformance with City standards, and do not accept the improvements.
535 Walker Drive, 400 San Antonio Road—Accept Public Improvements April 12, 2022
PUBLIC NOTICING
Agenda posting. A copy of the Council report was sent to each developer as follows:
• 535 Walker Drive—Walker Drive, LLC.
• 400 San Antonio Road—Prometheus Development, LLC.
Prepared by:
Neli Avramova
Senior Civil Engineer
Vincent Chang
Associate Civil Engineer
Reviewed by:
Ashraf Shah
Principal Civil Engineer
Edward Arango
Assistant Public Works Director/
City Engineer
Approved by:
Dawn S. Cameron
Public Works Director
Audrey Seymour Ramberg
Assistant City Manager/
Chief Operating Officer
NA-VC/TS/4/CAM
941-04-12-22CR
201899
cc: Walker Drive, LLC
6683 Owens Drive
Pleasanton, CA 94588
Prometheus Development, LLC
1900 South Norfolk Street, Suite 150
San Mateo, CA 94403
APWD—Arango, PCE —Byrer, PCE—Shah, SCE ―Avramova, SCE—Gunn, ACE―Chang, SMA—Goedicke, [email protected], PA —Li, SMA —Doan, F ( 535 Walker Drive), F (400 San Antonio Road)