2/23/23, 4:36 PM PRIORITY DEVELOPMENT AREA (PDA) PLANNING GRANT APPLICATION Survey https://www.surveymonkey.com/r/G276QBZ 1/11

PRIORITY DEVELOPMENT AREA
(PDA) PLANNING GRANT

APPLICATION
Overview & Instructions
Before completing this application, please review
the applicant guide and application checklist.

Applications are due Thursday, February 23th,
2023 at 11:59 PM.

Jurisdictions may apply for a maximum of two
(2) PDA
Planning or Plan Implementation grants
total. Please submit a separate application for
each.

NOTE: Your work here cannot be saved. As long
as you use the same device and web browser, you
should be able to start the application and return to
it. A cookie is stored in the browser that remembers
your survey responses. Once you click "Done" you
will not be able to go back to the application and
make changes.

To see a complete list of questions before
beginning the form
click here.

Please submit any outstanding questions to
[email protected] and someone from the
PDA team will get back to you.

EXIT
* Applicant Information
Attachment 2
2/23/23, 4:36 PM PRIORITY DEVELOPMENT AREA (PDA) PLANNING GRANT APPLICATION Survey https://www.surveymonkey.com/r/G276QBZ 2/11
Applicant
Project
Manager * Eric Anderson
Job Title Advanced Planning Manager
Local
Jurisdiction City of Mountain View
County Santa Clara County
Email
Address * [email protected]
Phone
Number 650-903-64-84
No file chosen
Please upload documentation of local support
for this application. This may include:

A City Council/Board of Supervisors or Planning
Commission resolution (recommended), or
An agenda from a City Council or Board of
Supervisors meeting at which the application was
discussed.
(To get started, download a template resolution,
template staff report, and template briefing.)
Choose File
Applicants may submit documentation after the
application due date, but no later than April 15th,
2023. Submit documentation to
[email protected].

If you will be submitting documentation of local
support after this application, please indicate the
approximate submission date. (Indicate "N/A" if
submitting documentation along with application.)
2/23/23, 4:36 PM PRIORITY DEVELOPMENT AREA (PDA) PLANNING GRANT APPLICATION Survey https://www.surveymonkey.com/r/G276QBZ 3/11
April 12, 2023
Project Information & Eligibility
Downtown PDA
* 1. Name of PDA
Downtown Precise
* 2. Plan or Project Name

3. Was this PDA established prior to 2019?
Yes No

4. Will the geographic area included in the project
be the same as the existing PDA? (See this map for
reference)
Yes, it will be identical
No, it will include part, but not all of the PDA
No, it will include all of the PDA and additional area
outside of the current boundaries
If "no", please upload a map of the anticipated
planning area (hand-drawn or digital formats are
2/23/23, 4:36 PM PRIORITY DEVELOPMENT AREA (PDA) PLANNING GRANT APPLICATION Survey https://www.surveymonkey.com/r/G276QBZ 4/11
Downtown PDA Precise Plans.jpg Remove File
both acceptable)
Replace File
* 5. What type of Grant are you applying for?
Plan
Plan Amendment
Plan Implementation (Technical Assistance)
$1,200,000
* 6. Amount Requested (not to exceed $1,200,000
for Plan, $600,000 for Plan Amendment, $200,000
for Plan Implementation)
1 $165,000 from appropriated CIP for downtown
2 3
4 5
Optional: Please identify any sources and amounts
of committed or anticipated funding for this project
2/23/23, 4:36 PM PRIORITY DEVELOPMENT AREA (PDA) PLANNING GRANT APPLICATION Survey https://www.surveymonkey.com/r/G276QBZ 5/11
* 7. All PDA Grants must either:

Include all of the required sections shown below; or
Integrate previously adopted or concurrent plans
and policies for any sections not included; or
Amend or implement an adopted plan that includes
each section.

Below, check each section that will be completed,
or amended, through this grant. Detailed
descriptions of each section, review the minimum
grant requirements available here. Note that section
title and organization may differ from those shown
below, but must achieve the minimum grant
requirements.

Plan Section: Development Standards
Plan Section: Public Realm Standards
Plan Section : Community and Equity
Plan Section: Capital Improvements
Plan Section : Implementation
Zoning and General Plan Amendments (to achieve
consistency with the Plan)
Environmental Document
Community Assessment
Community Engagement
If you did not check one or more of the boxes
above, please indicate the planning process
through which it was, or will be, completed, and
2/23/23, 4:36 PM PRIORITY DEVELOPMENT AREA (PDA) PLANNING GRANT APPLICATION Survey https://www.surveymonkey.com/r/G276QBZ 6/11
provide a link documenting its completion. (250
words max)
Downtown PDA Scope of Work.docx
Remove File
Please upload a preliminary scope of work and
budget. (See here for sample language and
template materials.)
Replace File
No file chosen
Optional: Please upload any additional material
you would like to share. None are required, but this
may include letters of support, background material
and graphics, etc.

Choose File
Project Benefits
2/23/23, 4:36 PM PRIORITY DEVELOPMENT AREA (PDA) PLANNING GRANT APPLICATION Survey https://www.surveymonkey.com/r/G276QBZ 7/11

* 8. Is part, or all, of the PDA within an Equity
Priority Community?
Yes No

* 9. Will the project implement the Transit Oriented
Communities (TOC) Policy? (Required for PDAs
within a TOC identified on this map; PDAs outside
TOCs may opt in to TOC standards.)
Yes No
If "yes", which TOC standards will be established
and/or implemented?
Minimum and Allowable Maximum Density for New
Residential Development (locate your PDA on this
map for applicable requirements)
Minimum and Allowable Maximum Density for New
Commercial Office Development (located your
PDA on this map for applicable requirements)
Affordable Housing Production, Protection and
Anti-Displacement Policies (see pp. 13-18 for
requirements)
Commercial Protection and Stabilization Policies
(see p. 19 for requirements)
Parking Requirements (locate your PDA on this
map for applicable requirements)
Transit Station Access and Circulation (see pp. 21-
22 for requirements)
2/23/23, 4:36 PM PRIORITY DEVELOPMENT AREA (PDA) PLANNING GRANT APPLICATION Survey https://www.surveymonkey.com/r/G276QBZ 8/11
! This question requires an answer.

If Yes, please explain (250 words maximum)
The draft 2023-2031 Housing Element includes a progra
* 10. Will the project involve rezoning or implement
programs and policies that are part of a Housing
Element Update?
Yes No
150-200
* 11. Enter the approximate increase in deed-
restricted affordable housing units resulting from the
project
600-800
* 12. Enter the approximate increase in total
housing unit capacity resulting from the project
* 13. Please upload a document (template available
here) explaining how the proposed project will:

Advance the protection, preservation and
production of affordable housing through existing or
new policies, programs, and investments applicable
to the PDA
Reduce vehicle miles travelled and increase transit
ridership through policies, programs, and
investments
2/23/23, 4:36 PM PRIORITY DEVELOPMENT AREA (PDA) PLANNING GRANT APPLICATION Survey https://www.surveymonkey.com/r/G276QBZ 9/11
Q13 DT PDA App.docx Remove File
Achieve greater racial equity in the PDA and/or city-
or region-wide, including through fair housing
policies, programs, and investments
(300 words max)
Replace File
* 14. Which Plan Bay Area 2050 Strategies will this
project support? (check all that apply.) To see the
full text for these strategies see pp. 4-8 of this .pdf.

Further Strengthen Renter Protections Beyond
State Legislation
Preserve Existing Affordable Housing
Allow a Greater Mix of Housing Densities and
Types in Growth Geographies
Build Adequate Affordable Housing to Ensure
Homes for All
Integrate Affordable Housing into All Major Housing
Projects
Transform Aging Malls and Office Parks into
Neighborhoods
Provide Targeted Mortgage, Rental and Small
Business Assistance to Equity Priority
Communities.

Accelerate reuse of public and community-owned
land for mixed-income housing
and essential services
2/23/23, 4:36 PM PRIORITY DEVELOPMENT AREA (PDA) PLANNING GRANT APPLICATION Survey https://www.surveymonkey.com/r/G276QBZ 10/11
T1, T3, T10, and T11 through improvements on and at th
Advance Regional Vision Zero Policy through
Street Design and Reduced Speeds
Invest in High-Speed Internet in Underserved Low-
Income Communities
Allow greater commercial densities in Growth
Geographies
Protect shoreline communities affected by sea
level rise, prioritizing areas of low costs and high
benefits and providing additional support to
vulnerable populations.

Expand Transportation Demand Management
Initiatives
Modernize and expand parks, trails and recreation
facilities.

Build a Complete Streets network
Support community-led transportation
enhancements in Equity Priority
Communities.

None of the above
Other(s) (please specify)
2/23/23, 4:36 PM PRIORITY DEVELOPMENT AREA (PDA) PLANNING GRANT APPLICATION Survey https://www.surveymonkey.com/r/G276QBZ 11/11

15. Has your jurisdiction formally adopted Vehicle
Miles Travelled (VMT) thresholds, screens and
mitigations complaint with Senate Bill 743 (SB
743)?
Yes No
http://laserfiche.mountainview.gov/WebLink/DocView.asp
If yes, please provide a link to the applicable City
Council or Board of Supervisors resolution.

If no, on what date will it be adopted?

SUBMIT(

SCOPE OF WORK

Introduction
The City of Mountain View (City) intends to conduct a comprehensive update to the Downtown Precise Plan, the zoning document for the 100-acre mixed-use, historic core of the city, adjacent to the Downtown Transit Center. The comprehensive update will revisit every section of the plan intended to update and clarify development standards, design guidelines, update land use mixes, and include new language regarding multi-modal access, mobility and parking, equitable community polices, and new public streetscape standards. The previous comprehensive updates to this plan were in 2000 and 2004.

The City will also prepare a programmatic EIR for this update, as well as any necessary General Plan and Zoning Code updates to maintain consistency.

Key elements of this project include:
• Creating development standards for increased residential densities and increased commercial intensities, consistent with the MTC TOC policy. • Expanding the Downtown Precise Plan to include the Transit Center, which is a Caltrain- endorsed joint development opportunity and a rezoning included in the draft Housing Element
• Expanding the Downtown Precise Plan to include the existing Public Safety Administration Building at 1000 Villa Street, which is being planned for redevelopment with a potential remainder parcel for a development opportunity
• Crafting innovative standards and incentives that will encourage jobs-housing balance, development of small parcels, diverse and affordable housing, transportation demand management, reduced parking, and other City and regional goals • Broad and equitable outreach program, including hard-to-reach tenant, employee and language groups
• Building off the City’s existing affordable housing production, preservation, and protection policies, which already exceed the MTC TOC policy (including but not limited to inclusionary zoning, funding, public land, condominium conversion restrictions, mobile home preservation, code enforcement/multifamily housing inspection, just cause eviction, rent stabilization, tenant relocation assistance, mobile home rent stabilization). In addition, the City is currently developing additional programs in support of these policies, including an Anti-displacement Program that may include permanent local measures to replace SB330. • Public realm standards that reflect and respond to new Council goals for improved streetscapes, including a Castro Street Pedestrian Mall • Innovative objective development standards that provide increased density while maintaining the historic scale and character of the area • New opportunities for affordable housing in an area that the draft Housing Element has identified as a key area of high opportunity and low non-white populations, which supports the City’s and region’s equity and fair housing goals
• Innovative programs to facilitate/encourage façade upgrades and discourage vacant storefronts
• Implementation of the recently adopted Downtown Parking Strategy, including programs to limit off-site parking impacts and encourage shared parking while implementing maximum parking and eliminating minimum parking in accordance with the MTC TOC policies and new state regulations, including AB 2097.

The City will hire a consultant for a complete overhaul of the existing Downtown Precise Plan. The consultant will advise the City and carry out studies, create visualizations, assist with outreach, and support the drafting of new standards and policies. The consultant will use its team's experience in architecture, design, and zoning to address the City's and neighborhood's primary design concerns by reimaging Downtown and the PDA area. Staff will manage the project, prepare staff reports, assist with major outreach tasks and fully conduct minor outreach tasks, review and assist with all deliverables, present at most hearings, and other tasks as needed. Staff time is not included in the project budget and will be funded with existing City expenditures.

The Precise Plan will include special focus on:
• Sustainability including energy and water efficiency, reduced vehicle dependence, a mutually supportive mix of land uses, and efficient public infrastructure; • Multi-modal transportation, including transit ridership promotion, new walking and biking infrastructure, new standards related to the Castro Street Ped Mall project, transportation demand management, better integration of the Downtown Transit Center VTA station and Caltrain Station with surrounding uses and the existing neighborhoods; • New equitable housing opportunities, including increased densities, affordable housing, and diverse housing types;
• Revitalization of commercial uses, including programs for façade upgrades, policies to address vacancies, and goods and services for the surrounding neighborhoods; • Objective, clear and feasible development standards; including site design, frontage, building massing, development intensity, use, FAR, setbacks, height, and parking; • Safe pedestrian-oriented places with a sense of identity and history; • Hands-on, multi-faceted, culturally sensitive outreach to help guide Community and Equity Policies, including stakeholder interviews, workshops, web-based outreach, and coordination with the community, including but not limited to, the development community, property owners, business owners, the Chamber of Commerce, the Downtown Committee, and members of the public.

The City of Mountain View is applying for two separate grants in the same PDA (Moffett Boulevard and Downtown) in order to preserve flexibility based on possible Council direction prior to April 15 (the grant deadline for Council resolutions of support). There are several possible scenarios:

1. Only one of the two grant applications are supported by Council. In this case, the other grant application will be withdrawn and the remaining grant application can be taken at face value.

2. Both grant applications are supported by Council as separate projects. In this case, there may be some savings in either application based on concurrent and overlapping work (existing conditions analysis, cumulative transportation and utilities analysis, some outreach, etc) more information will be provided with the Council resolution of support.

3. Both areas proceed as a single project. In this case, the City will withdraw the Moffett Boulevard Precise Plan application and the Downtown application will incorporate the Moffett Boulevard geography. Modifications to the scope will be addressed upon consultant selection, final scope approval and final agreements.

These two plans constitute most of the Downtown PDA. The remainder is the Evelyn Avenue Corridor Precise Plan, which has already been planned. See map below.

Downtown PDA – Existing and Proposed Plans

Task 1: Project Kick Off
• Project Initiation Meeting: confirm the project goals and schedule, discuss data and document requirements, and establish clear project management protocols for decision- m
aking, team coordination, data responsibilities, and team communication • C
ollect background information: obtain GIS information, reports, and other data, and collect and organize project data; and create initial base maps of the area • Community Engagement Strategy: prepare a community engagement strategy with a focus on community and equity, outlining key steps of the process and identifying stakeholders who should be involved, including key business stakeholders in the Downtown Area, office workers, retail/restaurant workers, tenant groups, advocacy organizations, VTA, Caltrain, the Mountain View TMA, The Downtown Association, The Chamber of Commerce, neighborhood association groups, etc.

Task 1 Deliverables

1. Project base maps and data

2. Community Engagement Strategy

Task 2: Initial Public Outreach and Website
• Stakeholder Interviews and focus group meetings: in person interviews, meetings, or phone/ virtual meetings with key stakeholders, such as the Mountain View Bicycle/Pedestrian Advisory Committee, key business stakeholders in the Downton Area, VTA, ABAG, the Mountain View TMA, the local development community, the Mountain View Coalition for Sustainable Planning and other stakeholders as needed.
• Community Workshop: the first opportunity for the public to discuss future development in the area and allow members of the public to explore planning concepts in Downtown. This may include identifying key opportunities and issues, refining the vision and guiding principles for the area. It will also provide an opportunity for the public to discuss where future residential and commercial development may be appropriate and the type, design, scale and intensity of development. It will also include education on the constraints of the plan, including state legislation related to parking and reductions in residential density, and the MTC TOC policy. The project team will also gather input on the types of streetscape and transportation improvements that would be needed to serve the Precise Plan. • City Council/EPC Meetings: Visioning/Direction/Background Information • Additional Outreach Tasks: an online survey or drafting online survey questions, preparing social media posts, and consulting with outside agencies, such as the U.S. EPA, the San Francisco Regional Water Control Quality Board, Santa Clara County Roads and Airports, and Department of Toxic Substances Control, Caltrain, VTA, Mountain View Transportation Management Association, Mountain View Whisman School District, Mountain View Los Altos High School District, and Caltrans.

Task 2 Deliverables

1. Preparation for and attendance at stakeholder meetings, workshop #1 and other outreach.

2. EPC and City Council meeting

Task 3: Background Summary Report and Technical Studies • Background Summary Report: This analysis and reports will support further outreach, identify issues and recommend policy approaches for the Plan. o The Existing Policy Analysis will include a general review and analysis of the policy documents applicable to the project area. This summary is intended to provide a consolidated summary of the existing policy environment in the Downtown as a reference for the course of the project. The review will likely include the following:
 The General Plan, particularly the Central Neighborhoods / Downtown Area  The Existing Downtown Precise Plan
 The Mountain View Transit Center Master Plan
 Downtown Parking Strategies/ Downtown Parking Standard  Mountain View Bicycle Transportation Plan
 Mountain View Pedestrian Master Plan
 The Castro Street Pedestrian Mall Plans
 Economic Vitality Strategy (in process) and Urban Land Institute Technical Assistance Panel
 Seifel Report on Phase I Precise Plan Update
 Other general documents related to the project area such as development plans for recently approved projects, planning studies, the zoning ordinance, improvement plans, traffic studies/reports and marketing reports. o The Land Use and Urban Design Analysis will include an assessment of the existing land use, zoning, densities, and urban design character, such as building footprints, building height and form, building type, building quality, streetscape character, natural features, patterns and analyze existing development guidelines and ways to elevate the guidelines to objective and clear development standards, and other topics as needed. o The Retail Demand Analysis will provide an overview of current downtown market conditions based on rents and vacancy levels for retail, office and/or residential uses in downtown Mountain View and analyze the city's competitiveness compared to other nearby retail concentrations to determine the potential for the Precise Plan area to attract and maintain existing neighborhood-serving and regional-serving retail. o The Parking Demand Analysis will evaluate existing parking demands and available supply for various land uses in the area including TDM measures available to employees and residents in the precise plan area.
o The Pedestrian and Bicycle Path Analysis will evaluate existing transportation system serving the Downtown area, including, but not limited to:
 Roadway systems
 Bus, Caltrain and light rail
 Existing and planned bicycle routes
 Pedestrian facilities
o Develop a list of TDM strategies best-suited for different development types. Prepare a report that describes the TDM strategies for inclusion in project TDM Plans, the land uses that they are applicable for, and a framework for their implementation. o Prepare a Community Assessment Summary Report defining the demographic and socio-economic characteristics of the planning area, physical aspects of the planning area, retail demand, parking, and pedestrian and bicycle conditions as well as any known issues or physical constraints that will need to be considered or addressed during the planning process. Summarize the primary issues facing the Downtown area, the constraints facing future growth and givens (or known projects, improvements, etc. that are expected to occur).
o An infrastructure analysis will help inform decision on placemaking and public realm improvements, and utility constraints.

Task 3 Deliverable: Background Summary Reports

Task 4: Alternatives Analysis
• Establish a draft of desired outcomes for the Downtown Precise Plan, based on community and decision-maker engagement. Outcomes will be used to frame and guide the Precise Plan, ensuring adherence to a broad set of desired parameters and addressing the PDA grant requirements. Outcomes may include:
o Higher transit ridership.
o Diverse land use mix and intensity, including residential uses. o Walking, bicycling, and other non-automobile access to the Precise Plan area, and within the district.
o Parking management.
o Increased housing opportunities including affordable housing o Equity and community-building
o Improved public spaces
o Opportunities for small businesses
• Prepare development and design alternatives incorporating but not limited to design standards, land use, mobility, parking, and urban form strategies that address desired outcomes.
• P
repare a high-level, qualitative and quantitative comparison-b ased assessment of the
implications for each alternative to provide development and design information for the community and decision makers to make informed choices about the alternatives.

• Hold community meetings and present the alternatives and an initial set of analysis related to the alternatives, which may include transportation, land use, equity, fiscal, and urban design analysis.
• Based on the information and input gathered from the community workshop and meetings with the EPC and City Council, prepare a single preferred alternative for the Downtown area. The final alternative will include the outcomes listed in task 4.1.

Including but limited to land use, transportation, and policy direction with community and equity policies for the area, include a land use plan, development characteristics, public real standards, and TDM plan.
•
Completion of the preferred alternative will kick start the programmatic EIR analysis.

Task 4 Deliverables

1. Draft Alternatives Development and Analysis

2. Community Workshop #2 and other outreach: Alternative Concept Plans

3. Development of the Preferred Alternative

4. City Council/EPC Meetings: Alternative Concept Plans

Task 5: Draft Precise Plan
• If directed by Council, additional outreach will be conducted to refine any key policy questions.
• One or more Policy Frameworks will be developed and presented to decision-makers to build consensus and confirm direction on the Plan. These may include:
o draft vision, guiding principles, and goals,
o community and equity policies,
o land use and design requirements or incentives,
o public realm standards, and/or
o implementation steps
• The findings of the analysis and final preferred conceptual designs described above will be consolidated into a Draft Plan. The Draft Precise Plan will include the following components at minimum:
o Vision and Guiding Principles
o Objective Development Standards and Guidelines, including Zoning o Green Building Standards and Guidelines
o Public Space and Placemaking Strategies, including Streetscape Plan and Public Realm Standards, complete streets, multimodal connectivity
o Parking Management and TDM standards consistent with the MTC TOC Policy o Infrastructure Guidelines and Plan to accommodate needed water, sewer, and other utilities improvements.
o Priority Improvements for the area including pedestrian and bicycle infrastructure, streetscape improvements, and district-level sustainability projects, among other identified priority projects.
o Funding Strategy for area improvements describing, potential mechanisms by which the infrastructure and capital improvements will be funded and financed in the future. o Implementation programs may include the Mountain View TMA, development impact fees, and so forth.

Task 5 Deliverables

1. Additional outreach if necessary

2. Policy Frameworks

3. City Council/EPC meetings: Policy Frameworks

4. Precise Plan Drafts

5. City Council/EPC Meetings: Public Draft

Task 6: Environmental Impact Report
• Prepare a programmatic EIR pursuant to CEQA as well as other studies to assess local impacts and mitigation measures resulting from the draft Plan, including:
o Multimodal transportation analysis
o Utility impact analysis
o Cultural resources impact analysis
o Air Quality and health risk assessments
o GHG studies
o Others as needed
Task 6 Deliverables

1. Environmental Impact Report

2. Multimodal Transportation Analysis

3. Other EIR Analyses

Task 7: Adoption and Certification
• Following the completion of the draft Precise Plan and programmatic EIR, move the documents through public review and adoption process, including EPC and City Council hearings.

Task 7 Deliverables

1. City Council/EPC Hearings, including Final Draft Plan and Changes Table

2. Final Precise Plan

Downtown Precise Plan Comprehensive Update Budget and Schedule Task# Work Description Amount Schedule
Task 1.1 Project Initiation, Data Collection, Basemaps $40,000 Fall 2023 Task 1.2 Community Engagement Strategy $10,000 Fall 2023 Task 2.1 Stakeholder Interviews and Meetings, Workshop #1 and other Outreach
$50,000 Winter 2024
Task 2.2 City Council/EPC Meetings:

Visioning/Direction/Background Info
$10,000 Winter 2024
Task 3 Background Summary Report $140,000 Spring 2024
Task 4.1 Draft Alternatives Development and Analysis $95,000 Summer 2024 Task 4.2 Community Workshop #2 and other outreach:

Alternative Concept Plans
$50,000 Summer 2024
Task 4.3 Development of the Preferred Alternative $55,000 Fall 2024 Task 4.4 City Council/EPC Meetings: Alternative Concept Plans
$10,000 Fall 2024
Task 5.1 Additional Outreach if necessary $35,000 Fall 2024 Task 5.2 Policy Framework $30,000 Fall 2024
Task 5.3 City Council/EPC Meetings: Policy Framework $5,000 Winter 2025 Task 5.4 Precise Plan Drafts $150,000 Spring 2025
Task 5.5 City Council/EPC Meetings: Public Draft Precise Plan $5,000 Spring 2025 Task 6.1 Environmental Impact Report $200,000 Summer 2025 Task 6.2 Transportation Analysis $200,000 Summer 2025
Task 6.3 Other EIR subconsultants (Air Quality, Utilities, Hazards, Cultural, Archaeological, etc)
$250,000 Summer 2025
Task 7.1 Adoption and Certification Hearings $20,000 Fall 2025 Task 7.2 Final Precise Plan $10,000 Fall 2025
TOTAL $1,365,000

Question No. 13, Downtown PDA Grant App:

• Bullet 1:
• Increased residential densities and reduced standards for residential development • Residential projects will include an inclusionary requirement • Innovative incentives to build residential densities on small parcels • City is preparing an Anti-displacement strategy, to include local replacement requirements, temporary housing, right of return and other programs to assist lower income residents displaced due to development. Precise Plan can increase densities to make these programs more effective
• Housing Impact Fees for new commercial uses
• Transit Center, City-owned lots as housing opportunities, including affordable housing

• Bullet 2:
• Project will include new mobility improvements for access to the Downtown Transit Center, the 3rd most-used station on the Caltrain line
• City is preparing a Citywide TDM ordinance to create framework for local mode-shift goals of the transit-oriented location, Downtown will exceed Citywide standards • Implementation of AB 2097 eliminating minimum parking requirements; implementation of MTC TOC Policy (max parking and no min parking standards) • Jobs-housing linkage, other innovative tools so job growth doesn't exceed housing growth (job growth contributes to longer trips)
• Respond to and integrate Castro Street Pedestrian Mall and other multimodal improvements
• Recent Downtown Parking Strategy includes action plan to integrate revisions to the downtown permit program, encouraging other modes, expansion of TMA, revisions to the Residential Permit Parking Program, public-private partnerships, and multi-modal incentives

• Bullet 3:
• Downtown area of high opportunity (transportation, jobs, access to government buildings, etc) - new development, including affordable development, can create opportunities for racial equity
• High cost of housing in MV is a barrier for equity - increased density, reduced standards, lower development costs and incentives for residential development over office development can address this
• Inclusion of several public meetings to help craft community and equity polices • Encourage production of affordable housing within a 15 min walk to the regional transit center