North Bayshore Master
Plan: Multi-Modal
Transportation Analysis
Prepared for:

David J. Powers and City of Mountain View
March 2023
SJ21-2116

Attachment 19

Table of Contents
Executive Summary ........................................................................................................................ i Project Description ....................................................................................................................................................................... i Land Use Program .............................................................................................................................................................. iii Transportation Infrastructure and District Parking Improvements .................................................................. v Transportation Demand Management Program Measures ................................................................................ x Project Traffic Volumes ............................................................................................................................................................. xi Site Access and On-Site Circulation .................................................................................................................................. xiii Motor Vehicle Operations ..................................................................................................................................................... xiv Intersections ......................................................................................................................................................................... xv Traffic Calming ......................................................................................................................................................................... xviii Pedestrian and Bicycle Operations................................................................................................................................... xviii Parking........................................................................................................................................................................................... xix Transportation Demand Management ............................................................................................................................. xxi Conclusion .................................................................................................................................................................................. xxii

1. Introduction and Project Description ..................................................................................... 1

1.1 Project Context and Analysis Approach....................................................................................................................... 1

1.2 Project Description ............................................................................................................................................................... 3

1.2.1 Land Use Program .................................................................................................................................................... 4

1.2.2 Transportation Infrastructure and District Parking Improvements ....................................................... 7

1.2.3 Transportation Demand Management Program Measures ...................................................................12

1.3 Study Area .............................................................................................................................................................................13

1.3.1 Study Intersections .................................................................................................................................................13

1.4 Analysis Scenarios...............................................................................................................................................................16

1.5 Criteria For Determining Adverse Effects ..................................................................................................................28

1.6 Report Organization ..........................................................................................................................................................29

2. Relevant Transportation Agencies, Plans, and Policies ....................................................... 30

2.1 Metropolitan Transportation Commission’s (MTC) Regional Transportation Plan (Plan Bay Area) ...30

2.2 Santa Clara Valley Transportation Authority VTP 2040 .......................................................................................32

2.3 Santa Clara Countywide Bicycle Plan ..........................................................................................................................33

2.4 Congestion Management Program Monitoring and Conformance Report ................................................33

2.5 City of Mountain View General Plan 2030 ................................................................................................................34

2.6 AccessMV: Comprehensive Modal Plan .....................................................................................................................34 Attachment 19

2.7 Mountain View Vision Zero Policy ...............................................................................................................................35

2.8 North Bayshore Precise Plan (NBPP) ...........................................................................................................................35

2.8.1 North Bayshore District Trip Cap Policy .........................................................................................................38

2.8.2 Site-Specific TDM Plan Policy ............................................................................................................................39

2.9 North Bayshore Circulation Study ................................................................................................................................39

3. Existing Conditions ................................................................................................................. 42

3.1 Existing Street System .......................................................................................................................................................42

3.2 Existing Truck Routes ........................................................................................................................................................44

3.3 Existing Pedestrian Facilities ...........................................................................................................................................44

3.4 Existing Bicycle Network ..................................................................................................................................................44

3.5 Existing Transit Service .....................................................................................................................................................47

3.6 Existing Intersection Volume Approach .....................................................................................................................54

3.7 Existing Intersection Operations ...................................................................................................................................54

3.8 Field Observations ..............................................................................................................................................................57

4. Site Access and On-Site Circulation ...................................................................................... 59

4.1 Pedestrian Access and Circulation ...............................................................................................................................59

4.1.1 Existing Pedestrian Access and Circulation ..................................................................................................59

4.1.2 Proposed Pedestrian Access and Circulation ...............................................................................................59

4.2 Bicycle Access and Circulation .......................................................................................................................................63

4.2.1 Existing Bicycle Access and Circulation ..........................................................................................................63

4.2.2 Proposed Bicycle Access and Circulation ......................................................................................................63

4.3 Pedestrian and Bicycle Access to Facilities ...............................................................................................................67

4.3.1 Pedestrians and Bicyclists Pathways to Transit ...........................................................................................67

4.3.2 Pedestrians and Bicyclists Pathways to District Parking Garages ........................................................68

4.3.3 Pedestrians and Bicyclists Pathways between Residential and Office ...............................................69

4.3.4 Orientation of Buildings to Bicycle Facilities and Ground Floor Activity ..........................................69

4.4 Vehicle Access and Circulation ......................................................................................................................................73

4.4.1 Existing Vehicle Access and Circulation .........................................................................................................73

4.4.2 Proposed Vehicle Access and Circulation .....................................................................................................73

4.5 Emergency and Service Vehicle Access ......................................................................................................................74

4.6 District Parking Access Evaluation................................................................................................................................75

4.6.1 Driveway Queuing Analysis .................................................................................................................................76

4.6.2 Driveway LOS Analysis ..........................................................................................................................................78

4.7 Adverse Effect Evaluation ................................................................................................................................................79 Attachment 19

5. Traffic Forecasts ...................................................................................................................... 86

5.1 Summary of Forecasts Methods ...................................................................................................................................86

5.2 Driveway Trip Generation ................................................................................................................................................86

5.2.1 Existing NBS Master Plan Land Use and Trip Generation .......................................................................86

5.2.2 Proposed NBS Master Plan Land Use and Vehicle Trip Generation ...................................................87

5.2.3 Person Trip Generation .........................................................................................................................................90

5.3 North Bayshore Gateway Volumes ..............................................................................................................................92

5.4 Service Population ..............................................................................................................................................................94

5.5 City of Mountain View Travel Model ..........................................................................................................................94

5.5.1 City of Mountain View Travel Model Documentation ..............................................................................94

5.5.2 Land Use Inputs .......................................................................................................................................................95

5.5.3 Transportation Network Inputs .........................................................................................................................99

5.5.4 Transportation Demand Management ........................................................................................................ 100

6. Motor Vehicle Operations Methods .................................................................................... 102

6.1 Traffic Analysis Methods ............................................................................................................................................... 102

6.1.1 Signalized Intersections ..................................................................................................................................... 102

6.1.2 Unsignalized Intersections ............................................................................................................................... 105

7. Cumulative Conditions ......................................................................................................... 106

7.1 Intersection Operations Analysis ............................................................................................................................... 106

7.1.2 Cumulative with Project Conditions ............................................................................................................. 110

8. Adverse Motor Vehicle Effects and Improvements ........................................................... 115

8.1 Adverse Effect Criteria .................................................................................................................................................... 115

8.1.1 Signalized Intersections ..................................................................................................................................... 115

8.1.2 Unsignalized Intersections ............................................................................................................................... 116

8.1.3 Adverse Effects and Improvements .............................................................................................................. 116

8.2 Storage Pocket Recommendations .......................................................................................................................... 132

8.3 Intersection Control Recommendations ................................................................................................................. 134

8.3.1 Volume and Peak Hour Signal Warrant Analysis ..................................................................................... 134

8.4 Operational Improvements at Rengstorff and Shoreline Gateways ............................................................ 136

9. Traffic Calming ...................................................................................................................... 142

9.1 Adverse Effect Evaluation ............................................................................................................................................. 143

10. Pedestrian Operations ........................................................................................................ 146

10.1 Existing Conditions ....................................................................................................................................................... 146 Exhibit 10

10.1.1 Existing Conditions Pedestrian Quality of Service ................................................................................ 146

10.2 Project Conditions ......................................................................................................................................................... 147

10.2.1 Project Conditions Pedestrian Quality of Service ................................................................................. 148

10.3 Pedestrian Volumes ...................................................................................................................................................... 149

10.4 Adverse Effects Evaluation ......................................................................................................................................... 150

11. Bicycle Operations .............................................................................................................. 154

11.1 Existing Conditions ....................................................................................................................................................... 154

11.1.1 Existing Conditions Bicycle Level of Traffic Stress ................................................................................ 154

11.2 Project Conditions ......................................................................................................................................................... 155

11.2.1 Project Conditions Bicycle Level of Traffic Stress (LTS) ...................................................................... 155

11.3 Bicycle Volumes ............................................................................................................................................................. 156

11.4 Adverse Effects Evaluation ......................................................................................................................................... 157

12. Parking Assessment ............................................................................................................ 161

12.1 Existing Conditions ....................................................................................................................................................... 161

12.2 Project Conditions ......................................................................................................................................................... 161

12.2.1 Proposed Parking Supply and Requirements ......................................................................................... 161

12.2.2 Vehicle Parking Requirements and Supply ............................................................................................. 163

12.2.3 Parking TDM Measures ................................................................................................................................... 164

12.2.4 Bicycle Parking Supply and Requirements .............................................................................................. 164

12.3 Adverse Effect Evaluation ........................................................................................................................................... 165

13. Transportation Demand Management ............................................................................. 166

Exhibit 10

Appendices

Appendix A: Existing Intersection Counts
Appendix B: Intersection Level of Service Calculation (Existing Conditions, Cumulative with Project Conditions, and Cumulative with Project Conditions - Operational Improvements) Appendix C: Cross Sections with City Comments
Appendix D: Gated Access Queuing Summary and Driveway LOS Calculations Appendix E: North Bayshore Precise Plan with Residential – Project Trip Generation Estimates Memorandum
Appendix F: North Bayshore Master Plan – Project Trip Generation Memorandum and Detailed Gateway Trip Generation
Appendix G: North Bayshore Precise Plan Intersection Improvement Appendix H: LOS and Queue Summary
Appendix I: 95th Percentile Queues (Existing Conditions, Cumulative with Project Conditions, and Cumulative with Project Conditions – Operational Improvements) Appendix J: Signal Warrants Summary
Appendix K: Isolated Intersection Discussion
Exhibit 10
List of Figures
Fig
ure ES-1: North Bayshore Master Plan Location ................................................................................................................ ii Figure ES-2: North Bayshore Master Plan – Land Use and Streets ................................................................................ viii Figure ES-3: North Bayshore Master Plan – Parking Locations ......................................................................................... ix Figure ES-4: Modeled Morning Inbound Peak Hour Mode Share for the North Bayshore Master Plan...........x Figure 1: North Bayshore Master Plan Location ....................................................................................................................... 2 Figure 2: North Bayshore Master Plan – Land Use and Streets ...................................................................................... 10 Figure 3: North Bayshore Master Plan – Parking Locations ............................................................................................. 11 Figure 4: North Bayshore Master Plan – Study Intersections ........................................................................................... 15 Figure 5: North Bayshore Precise Plan Transportation Improvement Projects ......................................................... 20 Figure 6: North Bayshore Precise Plan Growth Project Locations .................................................................................. 21 Figure 7: Sidewalk Gaps .................................................................................................................................................................. 50 Figure 8: Bicycle Facilities ............................................................................................................................................................... 51 Figure 9: Existing (Pre-COVID) Transit Service ....................................................................................................................... 52 Figure 10: Existing 2022 Transit Service ................................................................................................................................... 53 Figure 11: Peak Hour Traffic Volumes, Traffic Controls, Lane Configurations, and Level of Service Existing Conditions ................................................................................................................................................................... 58 Figure 12: Proposed Pedestrian Circulation ............................................................................................................................ 61 Figure 13: Proposed Pedestrian Circulation Recommendations .................................................................................... 62 Figure 14: Proposed Bicycle Circulation ................................................................................................................................... 65 Figure 15: Proposed Bicycle Circulation Recommendations ............................................................................................ 66 Figure 16: Pathways to Transit Stops ......................................................................................................................................... 70 Figure 17: Pathways to District Parking Garages .................................................................................................................. 71 Figure 18: Pathways between Residential and Office ......................................................................................................... 72 Figure 19: Proposed Vehicle Circulation .................................................................................................................................. 80 Figure 20: Morning Peak Hour Office and Residential Vehicle Trips ............................................................................ 81 Figure 21: Evening Peak Hour Office and Residential Vehicle Trips ............................................................................. 82 Figure 22: Emergency and Service Vehicle Access ............................................................................................................... 83 Figure 23: District Parking Access ............................................................................................................................................... 84 Figure 24: District Parking Access Comments ........................................................................................................................ 85 Figure 25: Signalized Level of Service Examples ................................................................................................................. 104 Figure 26: Peak Hour Traffic Volumes, Traffic Control, Lane Configurations, and Level of Service Cumulative with Project Conditions ........................................................................................................................................ 114 Figure 27: Intersection Control Recommendations ........................................................................................................... 140 Exhibit 10

Figure 28: Vehicular Improvements ......................................................................................................................................... 141 Figure 29: Cross-section of Plymouth Street West of Huff Avenue ............................................................................ 144 Figure 30: Cross-section of Joaquin Street ............................................................................................................................ 145 Figure 31: Existing Pedestrian Quality of Service ................................................................................................................ 152 Figure 32: Walksheds ..................................................................................................................................................................... 153 Figure 33: Existing Bicycle Level of Traffic Stress ................................................................................................................ 158 Figure 34: Bicycle Bikeshed .......................................................................................................................................................... 159 Figure 35: Project Conditions Bicycle Level of Traffic Stress .......................................................................................... 160

List of Tables

Table ES-1: North Bayshore Master Plan Land Use Program: Building Size ................................................................ iii Table ES-2: North Bayshore Master Plan Land Use Program: Building Size and Parking Location .................... iv Table ES-3: Driveway Trip Generation with Project .............................................................................................................. xii Table ES-4: Intersection Deficiency and Improvement Summary ................................................................................... xv Table ES-5: Parking Locations ....................................................................................................................................................... xx Table 1: North Bayshore Master Plan Land Use Program: Building Size ........................................................................ 5 Table 2: North Bayshore Master Plan Land Use Program: Building Square Footage and Supportive Parking Garage ............................................................................................................................................................. 6 Table 3: Summary of Scenario Characteristics ....................................................................................................................... 18 Table 4: North Bayshore Precise Plan Transportation Improvements .......................................................................... 22 Table 4: North Bayshore Building Size of New Projects and Demolition/Remodel of Existing Buildings (Changes from 2020)............................................................................................................................................... 26 Table 5: Criteria for Determining Adverse Effects and Operational Deficiencies ..................................................... 28 Table 6: Pre-COVID 2020 Transit Service ................................................................................................................................. 48 Table 7: Existing 2022 Transit Service ........................................................................................................................................ 49 Table 8: Existing Intersection Levels of Service ...................................................................................................................... 55 Table 9: Gated Access Queuing Summary ............................................................................................................................... 77 Table 10: District Parking Garage Level of Service – Cumulative with Project Conditions ................................... 78 Table 11: Driveway Trip Generation for Existing Buildings to be Demolished .......................................................... 87 Table 12: Driveway Vehicle Trip Generation with Project .................................................................................................. 89 Table 13: North Bayshore Master Plan Person Trip Generation by Mode of Travel – All Land Uses ............... 90 Table 14: North Bayshore Master Plan Person Trip Generation by Mode of Travel – Residential Land Uses ......................................................................................................................................................................................... 91 Exhibit 10

Table 15: North Bayshore Master Plan Person Trip Generation by Mode of Travel – Non-Residential Land Uses ................................................................................................................................................................................ 92 Table 16: North Bayshore Gateway Volume with Project .................................................................................................. 93 Table 17: Service Populations ....................................................................................................................................................... 94 Table 18: Land Use in North Bayshore Area: Total Building Area .................................................................................. 96 Table 19: Land Use in North Bayshore Area: Total Employee and Population Estimates ..................................... 97 Table 20: Land Use in North Bayshore Area: Occupied Building Area ......................................................................... 98 Table 21: Land Use in North Bayshore Area: Occupied Employee and Population Estimates ........................... 99 Table 22: Signalized Intersection Level of Service Definitions ....................................................................................... 103 Table 23: Signalized Intersection LOS Thresholds for Acceptable Operations ....................................................... 103 Table 24: Unsignalized Intersection Level of Service Definitions ................................................................................. 105 Table 25: Future Planned Improvement Assumptions...................................................................................................... 106 Table 26: Existing and Cumulative with Project Intersection Levels of Service ....................................................... 112 Table 27: Operational Improvements and Cumulative with Project Conditions LOS ........................................... 118 Table 28: Storage Pocket Length Recommendations ....................................................................................................... 133 Table 29: Intersection Control Recommendations ............................................................................................................. 135 Table 30: Pedestrian Quality of Service Criteria .................................................................................................................. 147 Table 31: Existing and Project Conditions Pedestrian Quality of Service .................................................................. 149 Table 32: Existing and Project Conditions Bicycle Level of Traffic Stress .................................................................. 156 Table 33: Parking Supply by Location and Land Use ........................................................................................................ 161 Table 34: Vehicle Parking Requirements ................................................................................................................................ 163 Table 35: Bicycle Parking Requirements ................................................................................................................................. 164 Table 36: Recommended North Bayshore District Trip Cap Policy Targets ............................................................. 167 Table 37: North Bayshore Gateway Trip Cap Policy Evaluation: Circulation Study Targets ............................... 168 Attachment 19

This page intentionally left blank.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis i Executive Summary
This report presents the results of the Multi-Modal Transportation Analysis (MTA) for the North Bayshore Master Plan (NBS Master Plan). Except for the Amphitheatre District garage (SA-P-1), the NBS Master Plan area is within the North Bayshore District and the North Bayshore Precise Plan (NBPP) area, which is generally bounded by the Shoreline at Mountain View Regional Park in the north, US 101 to the south, Stevens Creek to the east, and San Antonio Road to the west. The NBS Master Plan land uses are bounded by Huff Avenue, Bayshore Freeway, Pear Avenue, Charleston Road, and Stevens Creek.

Project Description
The NBS Master Plan includes a combination of land use, transportation infrastructure, district parking, and transportation demand management program improvements. To acknowledge the challe nge of accessing North Bayshore by vehicle, and to be more compliant with the North Bayshore District Trip Cap Policy, the trip generation presented in this report utilizes the NBS Master Plan proposed transportation demand management (TDM) measures to achieve a 35% morning peak hour inbound single-occupancy vehicle (SOV) mode share at the driveways for all non-residential development. Figure ES-1 shows the Master Plan boundary and location within the NBPP as well as the surrounding transportation network.

Exhibit 10

Charleston Rd
Middlefield Rd
Rengstorff Ave
Fabian Way
Old Middlefield Way
San Antonio Rd
Moffett Blvd
Middlefield Rd
Central Expwy
Shoreline
Blvd
Leghorn St
Inigo Way
Shoreline Blvd
Alta Ave
Huff Ave
Joaquin Rd
Crittenden Ln
Stierlin Ct
Charleston Rd
Shore Bird Way
Macon Ave
Space Park Way
Pear Ave
La Avenida St
Bayshore Pkwy
Coast Ave
Casey Ave
Broderick
Way
Terminal Blvd
Plymouth St
Marine Way
GarciaAve
Charleston Rd
San Antonio Rd
San Antonio Rd
Amphitheatre Pkwy
Landings Dr
Stevens Creek
101
101
85 Shoreline at
Mountain View Regional Park
]
Permanente
Creek

0.25 Miles
North Bayshore Master Plan Boundary
North Bayshore Precise Plan Boundary
City of Mountain View
North Bayshore Master Plan Location
Figure ES-1
\\Fpsj03.fpainc.local\data\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\02_Focused_VMT\Fig_ES_1_NBSMP_Location.ai Exhibit 10

Nor th Bayshore Master Plan: Multi-Modal Transportation Analysis iii Land Use Program
The total change in residential, office, retail, hotel, and community uses are shown in Table ES-1. The Project also includes 240 public parking spaces and 10 parking spaces for the police operations station within the Amphitheater District Garage.

Table ES-1: North Bayshore Master Plan Land Use Program: Building Size Land Use1 Units
Existing Conditions
(2020)2
[A]
Project Conditions
(2030)
[B]
Change
[B-A=C]
Residential – Market Rate Dwelling Units 0 5,600 5,600
Residential – Affordable Dwelling Units 0 1,400 1,400
Office Square Feet 8,653 3,145,897 3,137,244
Research & Development Square Feet 1,642,061 0 -1,642,061 Industrial Square Feet 92,497 0 -92,497
Retail/Commercial Square Feet 0 240,000 240,000
Active Space Kiosks Square Feet 0 4,0003 4,000
Hotel Rooms 0 525 525
Community Uses Square Feet 0 55,0004 55,000
Police Operations Station Square Feet 0 2,000 2,000
Notes:

1. Because it is not a programmed land use, the 240 public parking spaces and 10 parking spaces for the police operations station that are added to Amphitheatre District Parking Garage is not included in this building summary.

2. Existing Conditions is relative to 2020. Vacant buildings for 2020 include the 91,392 square feet at 1400 North Shoreline Boulevard, and the 30,520 square feet at 1220-1230 Pear Avenue. These vacant buildings at 1400 North Shoreline Boulevard and 1220-1230 Pear Avenue were not included in the 2020 baseline and therefore, do not show up as a demolished building credit.

3. The 4,000 square feet of active space kiosks identified in the Greenway Park West, Greenway Park East, and The Portal is a local serving use that is assumed not to generate separate vehicle trips during a typical day, but rather attract walking and biking trips from the surrounding land uses.

4. The 55,000 square feet of community uses is a local serving use that is assumed not to generate separate vehicle trips during a typical weekday, but rather attract walking and biking trips from the surrounding land uses. Weekend programming of the community uses would generate additional vehicle trips outside of the typical weekday.

Source: Fehr & Peers, 2023.

This project uses a combination of district parking and on-site parking for each land use. Each parking location will serve a combination of specified land uses. The parking location directly affects how vehicles travel on the local streets. The land use program is described by parking location in Table ES-2, and parking locations are shown in Figure ES-3.

Attachment 19

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
iv
Table ES-2: North Bayshore Master Plan Land Use Program: Building Size and Parking Location
Parking Location1 Parking
Spaces2
Residential:

Market
Rate
(Dwelling
Units)
Residential:

Affordable
(Dwelling
Units)
Office
(Square
Feet)3
Retail/
Commercial
Space
(Square
Feet)
Hotel
(Rooms)
Joaquin Neighborhood

1. District Garage (JN-P-1)4,5,6 500 0 0 0 35,000 0

2. North On-Site Parking 2,531 2,789 527 125,630 0 0

3. District Garage (JS-P-1)5,6 700 0 0 224,707 25,000 275

4. South On-Site Parking 746 720 294 25,000 0 0
Shorebird Neighborhood

5. District Garage (SB-P-1)4,5,6 600 0 0 0 180,000 250

6. On-Site Parking 1,826 1,832 328 162,160 0 0
Pear Neighborhood

7. On-Site Parking 331 259 251 0 0 0
Other Portions of the North Bayshore Master Plan

8. Amphitheatre District
Garage (SA-P-1)7,8 4,584 0 0 2,165,980 0 0

9. Marine Way District Garage
(MW-P-1 and MW-P-2) 890 0 0 444,420 0 0
Total of North Bayshore Master Plan
Total 12,708 5,600 1,400 3,147,897 240,000 525
Notes:

1. Parking locations serve certain land uses, depending on land use location and district parking management policy.

2. Parking spaces based on “Updated Car Parking” summary provided on October 19, 2022. Allocation of residential, office, and retail/commercial on-site parking spaces assumes that vehicles will park close to their desired destination; therefore, the on-site parking is distributed based on the land use allocation by neighborhood.

3. Assumes 90% of the office parking is assigned to the district garages (JN-P-1, JS-P-1, SA-P-1, MW-P-1, and MW-P-2) and 10% to the on-site parking locations in each neighborhood. The district office parking is distributed to district parking locations based on the number of designated office parking spaces available per district garage. The on-site parking is distributed to parking locations based on amount of office land use in each neighborhood.

4. Also serves residential visitor parking.

5. The 4,000 square feet of active space kiosks identified in the Greenway Park West, Greenway Park East, and The Portal is a local serving use that would not generate vehicle trips during a typical day, but rather attract walking and biking trips from the surrounding land uses. Retail/commercial parking when needed for events or specific active use programming would be provided in JN-P-1, JS-P-1, and/or SB-P-1.

6. The 55,000 square feet of community uses is a local serving use that is assumed not to generate separate vehicle trips during a typical weekday, but rather attract walking and biking trips from the surrounding land uses. Community uses parking when needed for weekend events or specific active use programming would be provided in JN-P-1, JS-P-1, and/or SB-P-1.

7. The Amphitheatre District Parking Garage is the 4,334 parking spaces for the NBS Master Plan, 10 parking spaces for the police operations station, and 240 public parking spaces added to Amphitheatre District Parking Garage.

8. The office summary includes the 2,000 square foot police operations station.

Source: Fehr & Peers, 2023.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis v Transportation Infrastructure and District Parking Improvements Per the March 2022 North Bayshore Framework Master Plan with September 2022, December 2022, and January 2023 amendments, the project will also feature new streets and other transportation infrastructure (illustrated on Figure ES-2), as well as, district parking (illustrated on Figure ES-3). The transportation infrastructure and district parking improvements include the following:
• New streets:
◦ Monarch Street is a proposed two-lane east-west Neighborhood Street with bicycle facilities that extends from Huff Avenue to Shoreline Boulevard. Monarch Street continues east of Shoreline Boulevard from Grove Street (new street) to Black Street. It will have a separated/buffered one - way bike lanes on each side of the street.
◦ C Street is a proposed two-lane north-south Neighborhood Street that extends south of Plymouth Street. It will have a separated/buffered one-way bike lanes on each side of the street. ◦ Grove Street is a proposed two-lane north-south Neighborhood Street that extends from Space Park Way to Shorebird Way. It will have a separated/buffered one-way bike lanes on each side of the street.
◦ Manzanita Street is a proposed two-lane north-south Neighborhood Street that extends from Space Park Way to Charleston Road. It will have a separated/buffered one-way bike lanes on each side of the street.
◦ Willow Street is a proposed two-lane north-south Neighborhood Street that extends from Monarch Street to Shorebird Way. It will have a separated/buffered one-way bike lanes on each side of the street.
◦ Inigo Way is a proposed two-lane north-south Neighborhood Street that extends from Space Park Way to Charleston Road. It will have a separated/buffered one-way bike lanes on each side of the street.
◦ Shorebird Way is proposed to be extended to the east as a Neighborhood Street to Black Street (new street). It will have a protected bidirectional cycle track on the north side of the street and a multi-use path will on the south side of the street.
◦ Black Street is a proposed two-way Access Street at the east terminus of Monarch Street extending north to Shorebird Way. It will have a separated/buffered one-way bike lanes on each side of the street. North of Shorebird Way, Black Street is proposed to be a one-way street with will have pedestrian access, bicycle access, and emergency vehicle access. • Modified streets:
◦ Huff Avenue between Plymouth Street and Charleston Road will be modified to a Neighborhood Street to include two travel lanes and separated one-way bike lanes on each side of the street. ◦ Joaquin Road between Plymouth Street and Charleston Road will be modified to a Neighborhood Street to include two travel lanes and a separated/buffered one-way bike lane on each side of the street.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
vi
◦ Shoreline Boulevard will be modified to be a 5-lane transit boulevard. It will have a separated/buffered one-way bike lane on each side of the street north of Space Park Drive.

Shorebird Way is proposed to be extended to the east as a Neighborhood Street to Monarch Street (new street). Shorebird Way has three Existing Street versions:
▪ Shorebird Way 01 (Arrival) is a Neighborhood Street with one lane between Shoreline Boulevard and Manzanita Street. It will have the Green Loop, a bidirectional cycle track on one side of the street.
▪ Shorebird Way 02 (Greenway) is a Neighborhood Street with one lane between Manzanita Street and Inigo Way. It will have a bidirectional cycle track on one side of the street. ▪ Shorebird Way 03 (Wilds) is a 2-lane Neighborhood Street between Inigo Way and Black Street. It will have a protected bidirectional cycle track on the north side of the street and a multi-use path will on the south side of the street.
◦ Space Park Way will be modified to be a 2-lane Neighborhood Street. It will have a separated one-way bike lane on each side of the street.
◦ Charleston Road between Black Street and Inigo Way will be modified to a one-way street, with public pedestrian access, bicycle access, emergency vehicle access, and limited access for specific land uses proposed in the future.
• Parking will be composed of on-site parking and off-site District parking ◦ Residents will use on-site parking, while residential visitors will use District parking garages. ◦ 90% of office employees and visitors will use District parking garages, while 10% of office employees and visitors will use on-site parking.
• District parking at five locations within the Master Plan area include the following:
◦ JN-P-1 (Joaquin North) is located at the southwest corner of Monarch Street and Joaquin Road within the Joaquin North neighborhood and contains approximately 500 parking spaces. JN -P-1 serves retail uses and hotel, neighborhood parks, open spaces, and residential visitor parking. ◦ JS-P-1 (Joaquin South) is a 6-level parking garage location in the Joaquin South neighborhood that contains approximately 700 parking spaces. JS-P-1 serves office (450 parking spaces), and retail and hotel, neighborhood parks, and residential visitor parking (250 parking spaces). ◦ SB-P-1 (Shorebird) is located at the northeast corner of Space Park Way and Manzanita Street within the Shorebird neighborhood and contains approximately 600 spaces. SB-P-1 serves hotel and active uses, neighborhood parks, open spaces, and residential visitor parking. ◦ SA-P-1 (Amphitheatre) is a 6-level parking garage located at the northwest corner of Shoreline Boulevard and Charleston Road that contains approximately 4,584 parking spaces for the NBS Master Plan (4,334 parking spaces), the police operations station (10 parking spaces), and the public parking spaces (240 parking spaces). SA-P-1 serves office employee parking. ◦ MW-P-1 & MW-P-2 (Marine Way) are 2- to 3-level parking garages along Marine Way that contain approximately 890 parking spaces. Both parking garages serve office uses.

Exhibit 10

Nor th Bayshore Master Plan: Multi-Modal Transportation Analysis vii • On-site parking within each neighborhood1 includes the following:
◦ Joaquin North neighborhood includes 2,531 on-site parking spaces for office, residential, retail, and active land uses.
◦ Joaquin South neighborhood includes 746 on-site parking spaces for office, residential, retail and hotel land uses.
◦ Shorebird neighborhood includes 1,826 on-site parking spaces for office, residential, retail, hotel, and active land uses.
◦ Pear neighborhood includes 331 on-site parking spaces for residential, and retail land uses. 1 Allocation of residential, office, and retail/commercial on-site parking spaces to each neighborhood assumes that vehicles will park close to their desired destination; therefore, the on-site parking is distributed based on the land use allocation by neighborhood.

Attachment 19
"z8„
)LJXUH/DQG8VH3ODQ
3ODQ1RWH


Q±ĉÑѕ‰įÕѕwă±ĉ

North Bayshore Master Plan - Land Use and Streets
Figure ES-2
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\NBS_MP_VMT\Fig_ES_2_NBSMP-LU_Streets.ai Source: North Bayshore Framework Master Plan (December 2022) "z8„
)LJXUH/DQG8VH3ODQ
3ODQ1RWH


Q±ĉÑѕ‰įÕѕwă±ĉ

Exhibit 10

0.25 Miles
1 ❷
3 ❹
5 ❻
❼
8 9

Charleston Rd
Old Middlefield Way
Leghorn St
Shoreline Blvd
Alta Ave
Huff Ave
Joaquin Rd
Crittenden Ln
Stierlin Ct
Charleston Rd
Shore Bird Way
Space Park Way
Pear Ave
La Avenida St
Plymouth St
Charleston Rd
Amphitheatre Pkwy
Landings Dr
Bayshore Pkwy
Coast Ave
Marine Way
San Antonio Rd
Rengstorff Ave
Casey Ave Broderick
Way
Garcia Ave
Stevens Creek
101
101
Shoreline at
Mountain View Regional Park
]
Permanente
Creek
North Bayshore Master Plan Boundary
District Garage
North On-Site Parking
Shorebird Neighborhood On-Site Parking
Pear Neighborhood On-Site Parking
South On-Site Parking
North Bayshore Precise Plan Boundary
City of Mountain View

0.25 Miles
North Bayshore Master Plan – Parking Locations
Figure ES-3
# Parking Location
Joaquin Neighborhood
1 District Garage (JN-P-1)
❷ North On-Site Parking
3 District Garage (JS-P-1)
❹ South On-Site Parking
Shorebird Neighborhood
5 District Garage (SB-P-1)
❻ On-Site Parking
Pear Neighborhood
❼ On-Site Parking
Other Portions of the North Bayshore
Master Plan
8 Amphitheatre District Garage (SA-P-1)
9 Marine Way District Garage (MW-P-1
and MW-P-2)
W:\San Jose N Drive\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\02_Focused_VMT\Fig_ES_3_NBSMP-Parking_Locations.indd Exhibit 10
x
45%
11%
1%
9%
34%
North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
Transportation Demand Management Program Measures
The proposed project will implement a TDM program to achieve a 35% morning peak hour inbound single-occupancy vehicle mode share at the development driveways (or district parking structures) for all non-residential development in the NBS Master Plan area. The project would implement various TDM measures consistent with the North Ba yshore Transportation Demand Management (TDM) Plan Guidelines (2015) for non-residential development and the North Bayshore Residential Transportation Demand Management Guidelines (2018) for residential development. Figure ES-4 shows the modeled morning inbound peak hour mode share for the North Bayshore Master Plans non-residential development, residential development, and total development at the driveways.

Figure ES-4: Modeled Morning Inbound Peak Hour Mode Share for the North Bayshore Master Plan
Non-Residential Development Residential Development Total Development Notes: This mode split is measured at the driveways of all development of the North Bayshore Master Plan (includes new and redeveloped office development).
35%
8%
35%
4%
18%
36%
9%
31%
5%
19%
Exhibit 10
Nort h Bayshore Master Plan: Multi-Modal Transportation Analysis xi Project Traffic Volumes
The NBS Master Plan daily driveway trip generation is shown in Table ES-3. The project driveway vehicle trip generation is based on the following information:
• New Residential Development: The new residential units are assumed to be a mix of 5,600 market rate units with an average size of 1.80 persons per household and a reduced parking supply rate of

0.65 spaces per dwelling unit, and 1,400 affordable housing units with an average size of 1.90 persons per household and a parking supply rate of 0.69 spaces per dwelling unit. This results in an estimate of 10,080 residents in the market rate units, 2,660 residents in the affordable housing units, and a total of 12,740 residents for the NBS Master Plan. The proposed residential uses would have a combined effective daily trip generation rate of approximately 3.78 daily vehicle trips per dwelling unit, 0.21 AM peak hour vehicle trips per dwelling unit, and 0.30 PM peak hour vehicle trips per dwelling unit.
• New and Rebuilt Office Development: The proposed office space is assumed to be 93% occupied (based on historical vacancy rates) at a density of 4.0 employees per 1,000 square feet gross floor area. This results in an estimate of 11,700 employees on site. The daily trip generation rate for new office uses in the NBS Master Plan area is 1.40 daily vehicle trips per employee, 0.20 AM peak hour vehicle trips per employee, and 0.17 PM peak hour vehicle trips per employee. This new office and other non-residential land uses are committed to achieving a 35% morning peak hour inbound single-occupancy vehicle mode share at the development driveways. • New Retail and Entertainment Development: The proposed retail space is assumed to be 93% occupied at a density of 2.67 employees per 1,000 square feet gross floor area. This results in an estimate of 600 employees on site. The daily trip generation rate for new retail/entertainment uses in the NBS Master Plan is 16.3 daily vehicle trips per employee, 0.35 AM peak hour vehicle trips per employee, and 0.63 PM peak hour vehicle trips per employee. • New Hotel Development: The proposed hotel space is assumed to have an employment density of

0.4 employees per room. This results in an estimate of 210 employees on site. The daily trip generation rates for new hotel uses in the NBS Master Plan are 4.79 daily vehicle trips per room, 0.23 AM peak hour vehicle trips per room, and 0.18 PM peak hour vehicle trips per room. • New Police Operations Station Development: The proposed Police Operations Station is assumed to be 93% occupied (based on historical vacancy rates) at a density of 4.0 employees per 1,000 square feet gross floor area. This results in an estimate of 10 employees on site. The daily trip generation rate for new Police Operations Station land uses in the NBS Master Plan area is 1.40 daily vehicle trips per employee, 0.20 AM peak hour vehicle trips per employee, and 0.17 PM peak hour vehicle trips per employee.
• Public Parking at SA-P-1: The 240 public parking spaces at SA-P-1 are assumed to have a trip generation similar to Existing Conditions: 440 daily vehicle trips, 40 AM peak hour vehicle trips, and 40 PM peak hour vehicle trips.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
xii
Table ES-3: Driveway Trip Generation with Project
Land Use Building Size Service
Population1
Daily
Trips1
AM Peak Hour Trips1 PM Peak Hour Trips1
In Out Total In Out Total
North Bayshore Master Plan
Residential – Market Rate 5,600 dwelling
units 10,080 21,560 280 900 1,180 990 690 1,680
Residential – Affordable 1,400 dwelling
units 2,660 4,930 60 200 260 220 160 380
North Bayshore Master Plan
Residential Trips (A) 12,740 26,490 340 1,100 1,440 1,210 850 2,060 Office 3,145,897
square feet 11,700 16,360 2,070 280 2,350 330 1,700 2,030 Commercial/Retail Space 240,000 square
feet 600 9,720 130 80 210 180 190 370
Active Space Kiosks2 4,000 square feet 0 0 0 0 0 0 0 0
Hotel 525 Rooms 210 2,520 70 50 120 50 50 100
Community Uses3 55,000 square feet 0 0 0 0 0 0 0 0
Police Operations Station 2,000 square feet 10 20 0 0 0 0 0 0 Public Parking at SA-P-1 240 spaces 0 440 20 20 40 20 20 40 North Bayshore Master Plan
Non-Residential Trips (B) 12,520 29,060 2,290 430 2,720 580 1,960 2,540 North Bayshore Master Plan
Trips (A + B = C) 25,260 55,550 2,630 1,530 4,160 1,790 2,810 4,600 Existing Building Credit
Office 8,653 square feet -30 -90 -10 0 -10 0 -10 -10
Research & Development 1,642,061
square feet -5,720 -16,510 -1,330 -250 -1,580 -280 -1,120 -1,400 Industrial 92,497 square feet -110 -410 -50 -10 -60 -10 -40 -50 Public Parking at SA-P-1 240 spaces 0 -440 -20 -20 -40 -20 -20 -40 Existing Building Credit (D) -5,860 -17,450 -1,410 -280 -1,690 -310 -1,190 -1,500 Net Change
Net Increase (C + D = E) 19,400 38,100 1,220 1,250 2,470 1,480 1,620 3,100 Notes:

1. Service population and daily trips rounded to the nearest 10.

2. The 4,000 square feet of active space kiosks identified in the Greenway Park West, Greenway Park East, and The Portal is a local serving use that is assumed not to generate vehicle trips.

3. The 55,000 square feet of community uses is a local serving use that is assumed not to generate separate vehicle trips during a typical weekday, but rather attract walking and biking trips from the surrounding land uses. Weekend programming of the community uses would generate additional vehicle trips outside of the typical weekday.

Source: Fehr & Peers, 2023.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis xiii Site Access and On-Site Circulation
This multi-modal site access, circulation, and parking evaluation of the NBS Master Plan evaluates the NBS Master Plan access and internal circulation for pedestrians, bicyclists, and vehicles. The plan also evaluates the consistency with the NBPP mobility policies, standards, and guidelines based on the Parking Layout and Circulation Plan site plans provided by the applicant. Based on the evaluation, the NBS Master Plan is constructing new facilities that improve the site access and circulation for pedestrians and bicyclists.

While the NBS Master Plan provides circulation throughout the Master Plan area, there were recommendations on the NBS Master Plan figures for consideration in refining the proposed pedestrian access and circulation:

1. Minimize the number of driveways along Shoreline Blvd from Charleston Rd to Plymouth St

2. Remove or modify pedestrian circulation to be consistent with Green Loop

3. Show pedestrian facility along Space Park Way and Manzanita St

4. Show pedestrian facility along Space Park Way and Grove St

5. Show pedestrian facilities on both sides of the Private St

6. Show pedestrian facilities on both sides of Manzanita St

7. Show north/south crossings at Plymouth Ave and Joaquin Rd

8. Show north/south crossings at Plymouth Ave and Huff Rd While the NBS Master Plan provides bicycle circulation throughout the site, the NBS Master Plan should consider the below recommendations:

1. Show a bicycle facility connection to Monarch St

2. Charleston Rd west of Joaquin Rd: make Class IV separated one way cycle track to conform to cross section

3. Indicate connection at Inigo Way to south of Space Park Way

4. Indicate connection at Manzanita St to south of Space Park Way

5. Indicate connection at Grove St to south of Space Park Way

6. Indicate connection at Joaquin Rd to south of Plymouth St

7. Indicate connection at Huff Ave to south of Plymouth St

8. Indicate connection at Willow St to south of Monarch St

9. Indicate connection at Main St to south of B St

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
xiv
The NBS Master Plan was also evaluated for internal vehicle circulation. While the NBS Master Plan provides vehicle circulation throughout the site, we recommend the NBS Master Plan:

1. If center lane bus stops are to be used during peak hours, extend length of stops along Shor eline Boulevard south of Space Park Way. If operated during peak hours, stops should be long enough to accommodate 2-3 buses to allow for more efficient boarding and alighting. Exact length should be determined upon further study.

2. Provide vehicle right-of-way (ROW) in the northbound direction along the segment of Shoreline Boulevard between Pear Avenue and Space Park Way to account for additional storage capacity.

This is consistent with the NBPP, which states that additional right-of-way can be provided along Shoreline Boulevard to accommodate site specific conditions. However, because the NBS Master Plan provides a general level of detail of the land use and transportation network, there may be a need to conduct additional transportation analysis during the PCP (Planned Community Permit) stage or post-construction phase and may require subsequent site specific transportation analysis to ensure that the roadway network and the project sites are designed and built to the City’s specifications. In this future phase, reference the VTA Bus Stop & Passenger Design Criteria and Guidelines for bus stop sizing.

The NBS MP allocated 90% of the office parking to the five district parking locations (MW-P-1 & MW-P-2, JN-P-1, JS-P-1, SB-P-1, SA-P-1) within the NBS Master Plan area to reduce SOV commutes and increase land use efficiency; the remaining 10% is for on-site parking locations. We recommend the following elements:

1. Clarify the multimodal access strategy at the MW-P-1 and MW-P-2 district parking structure, including whether there are transit stops, for access to the NBS Master Plan site, micromobility, and bicycle and pedestrian connections.

2. Clarify the intersection design and phasing at the entrance to Amphitheatre Parking Garage from Amphitheatre Parkway.

3. Consider moving the active use parking on Shoreline Boulevard south of Shorebird Way to avoid Green Loop conflicts and use right-in-right-out access.

Motor Vehicle Operations
Intersections within the project study area were analyzed to identify operations deficiencies and improvements rather than to determine environmental impacts within the meaning of CEQA. Deficiency criteria were presented in the City of Mountain View 2030 General Plan and Greenhouse Gas Reduction Program EIR. The level of service method, which is approved by the City of Mountain View and the VTA, analyzes a signalized intersection’s operation based on average control delay per vehicle. The average control delay is calculated using Synchro 11 or TRAFFIX 8.0 analysis software and is correlated to a LOS designation.

Exhibit 10

Nor th Bayshore Master Plan: Multi-Modal Transportation Analysis xv Intersections
Adverse effects or operational deficiencies on intersections were evaluated under Cumulative with Project Conditions. Where adverse intersection effects are identified, physical improvements are identified that would address the operational LOS and queuing deficiency. While many of the identified improvements may not fully address LOS deficiencies and these adverse effects may remain, they do improve intersection delays and/or queues. The identified improvements focus on improving the conflict points that most affect the gateway capacity, including conflict points between office and residential turn movements and gateway turn movements. However, the identified operational improvements may have secondary effects on pedestrian and bicycle travel, especially those that require addition of lanes and roadway widening that increased pedestrian crossing distances and associated pedestrian crossing times.

Such effects could be in conflict with the NBPP’s multimodal circulation goals; thus the City will need to balance the need for operational improvements with the NBPP Master Plan’s overall circulation goals.

These identified improvements do not preclude the City of Mountain View from establishing policies and programs to reduce the severity of the adverse effect on these facilities. Lastly, the final improvement s will require coordination among multiple stakeholders to address the practical steps of implementing physical improvements, such as additional right of way. Intersections with deficiencies and improvements are summarized below in Table ES-4. For each deficient intersection, improvements that address level of service deficiencies are listed first, followed by improvements that address queuing deficiencies. The approaches for which the stated modifications may improve overall intersection motor vehicle operations are listed in northbound (NB), southbound (SB), eastbound (EB), and westbound (WB) approach order.

Table ES-4: Intersection Deficiency and Improvement Summary Intersection
Deficiency Identified?
Operational Improvements Recommended
for Future Study1 Existing
Cumulative with
Project
Conditions
2 San Antonio Rd /
US 101
Northbound Ramps
No Yes
(AM Peak Hour)
Intersection LOS Improvements
Lane marking improvements to NB departure
Intersection Queuing Improvements
Turn pocket improvements to the WB approach
4 Rengstorff Ave /
US 101 Northbound
Ramps
No
Yes
(AM and PM
Pea
k Hour)
Intersection LOS Improvements
Geometric improvements to the NB, EB, and WB
approaches
Intersection Queuing Improvements
Turn pocket improvements to the SB, EB,
and WB approaches
5 Rengstorff Ave /
US 101 Southbound
Ramps
Yes

(AM Peak Hour)
Yes
(AM Peak Hour)
Intersection LOS Improvements
Geometric improvements to the NB and WB
approaches
Intersection Queuing Improvements
Turn pocket improvements to the EB and WB
approaches
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
xvi
Intersection
Deficiency Identified?
Operational Improvements Recommended
for Future Study1 Existing
Cumulative with
Project
Conditions
6 Rengstorff Ave /
Leghorn St No
Yes
(AM and PM
Peak Hour)
Intersection LOS Improvements
Geometric improvements to the EB and WB
approaches
Intersection Queuing Improvements
Turn pocket improvements to the NB and SB
approaches
9 Huff Ave / Charleston Rd No No
Intersection Queuing Improvements
Turn pocket improvements to the NB and WB
approaches
11 Shoreline Blvd /
Charleston Rd
Yes
(PM Peak Hour)
Yes
(AM and PM
Peak Hour)
Intersection LOS Improvements
Geometric improvements to the SB and EB
approaches
Intersection Queuing Improvements
Turn pocket improvements to the NB, SB, EB
and WB approaches
13 Huff Ave / Plymouth St No
Yes
(AM and PM
Peak Hour)
Intersection LOS Improvements
Geometric improvements to all approaches and
intersection signalization
14 Joaquin Rd / Plymouth St No
Yes
(AM and PM
Peak Hour)
Intersection LOS Improvements
Geometric improvements to all approaches and
intersection signalization
15 Shoreline Blvd /
Space Park Wy
Yes
(AM Peak Hour)
Yes
(AM and PM
Peak Hour)
Intersection LOS Improvements
Geometric improvements to the NB, SB, and EB
approaches and signal phasing improvements,
dedicated bus signal phase
Intersection Queuing Improvements
Turn pocket improvements to the NB approach
17 Shoreline Blvd / Pear Ave Yes
(AM Peak Hour)
Yes
(AM and PM
Peak Hour)
Intersection LOS Improvements
Geometric improvements to the NB and EB
approaches and signal phasing improvements,
including dedicated bus signal phase
18 Shoreline Blvd /
La Avenida-US 101
Northbound Ramps
Yes
(AM and PM
Peak Hour)
Yes
(AM and PM
Peak Hour)
Intersection LOS Improvements
Geometric improvements to the WB approach
21 Inigo Wy / La Avenida No
Yes
(AM and PM
Peak Hour)
Intersection LOS Improvements
Geometric improvements to the NB and EB
approaches and intersection signalization
Notes:

1. Potential operational improvements may have secondary effects on pedestrian and bicycle travel and the City will need to balance the need for operational improvements with the NBPP Master Plan’s overall circulation goals before implementing any of the potential operational improvements.

Source: Fehr & Peers, 2023.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis xvii Recommendations
The following recommendations regarding the suggested intersection modifications are proposed to identify next steps that can be considered in conjunction with approval of the Master Plan and actions that can be taken to address future intersection deficiencies.

San Antonio and Rengstorff / US 101 Interchanges (Intersections 1-6) These suggestions should be reviewed through the current VTA / Caltrans San Antonio/Rengstorff Interchange project (PA & ED Phase).

The suggested improvements can be considered for potential inclusion in the PA & ED study. A recommended project (or phases) for these two interchanges will be developed through the PA & ED and will be separately funded.

Charleston Transit Boulevard (Intersections 7-10) Evaluate the impact of turn lane extensions on median and bus lane operations. These modifications are not supported if additional right-of-way is required or if there are negative effects on the bus lane operation A decrease in the length of a dedicated bus lane for the benefit of vehicle operations is not consistent with Council priorities.

Shoreline Intersections (Intersections 11, 15, 17) Additional detailed analysis of these draft intersection improvements is needed to determine feasibility, operational benefits, and right-of-way impacts. Some proposals are not consistent with the advanced design of Priority Transportation Improvement projects and require additional property. Expansion of public right-of-way for the benefit of vehicle operations is not consistent with Council's current priorities.

The report indicates that even with priority transportation improvements and the NBPP improvements, with the addition of the project traffic, Shoreline Boulevard will operate with deficiencies, particularly during the evening peak hour for the southbound direction. Operations on Shoreline Boulevard indicates a need to develop additional strategies to better manage peak period congestion. A Shoreline Corridor Plan should be developed to identify traffic management strategies. Those strategies, after further evaluation, can be considered for future implementation in conjunction with Master Plan development phases. Funding is needed to develop the Corridor Plan and to implement the improvement strategies.

Plymouth Street Intersections (Intersections 12-14) The proposed right-of-way impacts of added turn lanes should be evaluated in conjunction with detailed intersection design at the individual project approval phase. Improvements should be consistent with street design approved through the North Bayshore Master Plan.

Signalization of Plymouth intersections is expected to be warranted in the future. Fair share contribution calculations are provided for City staff to develop fair share contributions for intersectio n improvements.

Shoreline / US 101 Interchange (Intersections 18-21) These suggestions should be coordinated with current plans for the Shoreline / US 101 Ramp Realignment project. In the near term, no changes to current projects are expected. Some improvements may be considered as a future phase with additional funding of improvements. Expansion of public right-of-way for the benefit of vehicle operations is not consistent with Council's current priorities.

Exhibit 10
Nor
th Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
xviii
Signalization of Inigo/La Avenida intersection may be warranted in the future. Fair share contribution calculations are provided for City staff to develop fair share contributions for intersection improvements.

Traffic Calming
The NBS Master Plan will develop a dense and flexible street grid that allows for safe travel for all modes through the site. The new street grid will include new or retrofitted complete streets, pedestrian pathways, and multi-use trails integrated with the existing street network. This includes the Green Loop that provides pedestrian and bicycle connections within the NBS Master Plan area as well as the nearby trails and parks, the Social Spine that provides space for active uses and pedestrian connections within Shorebird, and a network of new off-street paths. In addition to adding new streets, the NBS Master Plan will retrofit several existing streets to increase the visibility of pedestrians and bicyclist, shorten crossing distances for pedestrians and bicyclists, and/or slow the speed of vehicles at mid-block and at intersections using traffic calming treatments, such as curb extensions, raised crosswalks or intersections, and tighter curb returns especially for the most local streets. Because most of the vehicles passing through the North Bayshore gateway will have an origin or destination within the North Bayshore District and because of its size, in the NBS Master Plan area, the project, at this time, is not considered to have an adverse effect on any of the three applicable criteria per Section 1.5/Table 5. However, because the NBS Master Plan provides a general level of detail of the land use and transportation network, there may be a need to conduct additional transportation analysis during the PCP (Planned Community Permit) stage or post-construction phase and may require subsequent site specific transportation analysis to ensure that the roadway network and the project sites are designed and built to the City’s specifications.

Pedestrian and Bicycle Operations
The proposed plan encourages pedestrian mobility through new streets and mid-block connections, which will enhance the pedestrian experience by reducing the scale of the urban grid to create a dense and flexible network and providing safe and direct pedestrian connections to neighborhood services, places of work, residences, amenities, parks and open space, and transit facilities. Pedestrian Quality of Service (PQOS), which illustrates the quality and walkability of sidewalk facilities, ranges from 1 to 5 (with 1 being the highest quality); however, the existing PQOS for the NBS Master Plan site ranges between a PQOS 4 and PQOS 5. The proposed NBS Master Plan will enhance the pedestrian conditions and improve PQOS by adding sidewalks, paths, the Social Spine, and the Green Loop for pedestrians. The project is not considered to have an adverse effect on any of the four applicable pedestrian criteria per Section

1.5/Table 5.

Bicycling level of traffic stress (LTS) is used to evaluate the quality of a person’s experience while bicycling through a 1-4 scoring system, with 1 and 2 being low stress and preferred. Under Existing Conditions, bicycling level of stress along Shoreline Boulevard between Charleston Road and North Road is LTS 4 and is LTS 3 along Amphitheatre Parkway and Charleston Road. The rest of the NBS Master Plan site areas are LTS 1 and 2. A 3.7 mile off-street and on-street bicycle network is proposed to provide a variety of options for cyclists of all ages and capabilities. The bicycle network will include expansions of and enhancements Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis xix to existing bike facilities as well as new connections to the regional bike network. The addition of low stress bicycle network components improves the overall quality of the streets. Under Project Conditions, all streets are rated very good or good with respect to the bicycle LTS score. Bikeshare services should be integrated into transit stations to support last-leg connections. Because the NBS Master Plan provides a general level of detail of the land use and transportation network, there will be a need to conduct additional transportation analysis during the PCP (Planned Community Permit) stage and may require subsequent site specific transportation analysis to ensure that each mode of travel and the project site are designed and built to the City’s specifications. The project, at this time, is not considered to have an adverse effect on any of the three applicable bicycle criteria per Section 1.5/Table 5.

Parking
The parking in the existing plan area is characterized by surface parking lots that front/surround most individual buildings. The NBS Master Plan parking strategy proposes to relocate and consolidate the existing surface lots into centralized district parking facilities with a limited amount of parking retained at individual sites. The goal of the parking strategy is to reduce demand for parking by constraining supply and providing complementary TDM measures, shown in the TDM section (Chapter 13), and the Transportation Demand Program measures (Chapter 1.2.3). The NBS Master Plan includes five district parking locations within the NBS Master Plan area:
• JN-P-1 (Joaquin North) is located at the southwest corner of Monarch Street and Joaquin Road within the Joaquin North neighborhood and contains approximately 500 parking spaces. JN -P-1 serves active uses and hotel, neighborhood parks, open spaces, and residential visitor parking. • JS-P-1 (Joaquin South) is a 6-level parking garage location in the Joaquin South neighborhood that contains approximately 700 parking spaces. JS-P-1 serves office (450 parking spaces) and retail and hotel uses (250 parking spaces).
• SB-P-1 (Shorebird) is located at the northeast corner of Space Park Way and Manzanita Street within the Shorebird neighborhood and contains approximately 600 spaces. SB-P-1 serves hotel and active uses as well as residential visitor parking.
• SA-P-1 (Amphitheatre) is a 6-level parking garage located at the northwest corner of Shoreline Boulevard and Charleston Road that contains approximately 4,584 parking spaces for the NBS Master Plan (4,334 parking spaces), the police operations station (10 parking spaces), and the public parking spaces (240 parking spaces). SA-P-1 serves office employee parking. • MW-P-1 & MW-P-2 (Marine Way) are 2- to 3-level parking garages along Marine Way that contain approximately 890 parking spaces. Both parking garages serve office uses.

In addition to the district parking locations, the NBS Master Plan includes office and residential on -site parking locations within the NBS Master Plan area. To lower office workers’ dependency on SOV, the NBS Master Plan provides 90% of the office parking in district office parking garages SA -P-1, JS-P-1, and the Marine Way garages (MW-P-1 and MW-P-2), and only 10% of the office parking in office on-site parking locations adjacent to the office buildings.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
xx
The NBS Master Plan parking strategy proposes to relocate and consolidate the existing surface lots into centralized district parking facilities with a limited amount of surface parking retained at individual sites. A total of 12,708 parking spaces are proposed, including 7,274 in district parking and 5,434 in on- site parking locations. Of these 4,550 are allocated for residential uses, 6,587 to office uses and 1,203 to retail/visitor, and 368 to hotel uses. Each parking location will serve different land uses and thus affect how vehicles travel on the local streets. Table ES-5 shows the proposed parking supply by location and land use. The NBP Master Plan meets the proposed parking maximum provided per the NBPP.

Table ES-5: Parking Locations
Parking Location Parking
Spaces1
Residential
Parking Office Retail/Visitor Hotel

1. District Garage (JN-P-1) 500 0 0 500 0

2. District Garage (JS-P-1) 700 0 450 57 193

3. District Garage (SB-P-1) 600 0 0 425 175

4. Amphitheatre District Garage
(SA-P-1) 4,584 0 4,584 0 0

5. Marine Way District Garage
(MW-P-1 and MW-P-2) 890 0 890 0 0

6. On-site parking 5,434 4,550 663 221 0
Total 12,708 4,550 6,587 1,203 368
Source: Fehr & Peers, 2023.

The carshare vehicle requirement for office/research and development land uses is a minimum of three parking spaces per building site for carshare operators. For residential land use, the carshare vehicle requirement is at least one carsharing space for residential parking lots with over 50 parking spaces and at least two carsharing spaces plus 1 space for every 200 additional spaces for residential lots 200 and over.

Dedicated carshare spaces will be provided in all garages in the NBS Master Plan area. For office parking, this includes a minimum of 3 car share spaces in each office parking lot. For residential parking, this includes at least 1 space for residential lots over 50 spaces and at least 2 spaces for residential lots over 200 spaces, plus 1 for every additional 200 dwelling units. Car share spaces may also be clustered in centralized locations. The NBS Master Plan’s provision of carshare spaces in all parking locations would meet the NBPP requirements.

The project would provide sufficient bicycle parking spaces including short-term and long-term parking for office, retail, and residential uses to meet the NBPP requirements.

1. The project, at this time, is not considered to have an adverse effect on any of the four applicable parking criteria per Section 1.5/Table 5.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis xxi Transportation Demand Management
The NBS Master Plan will implement a TDM program to achieve a 35% morning peak hour inbound single-occupancy vehicle mode share at the development driveways (or district parking structures) for all non-residential development in the NBS Master Plan area. The NBS Master Plan’s TDM Plan is a description of Google’s approach to reducing vehicle trips by offering employees and residents transportation choices to meet the City’s policy requirements and sustainability goals. The TDM Plan describes City of Mountain View transportation policies related to TDM and serves as a guide on how Google will implement the TDM Plan and monitor its success. Specifically, the TDM Plan would implement various TDM measures consistent with the North Bayshore Transportation Demand Management (TDM) Plan Guidelines (2015) for non-residential development and the North Bayshore Residential Transportation Demand Management Guidelines (2018) for residential development. The TDM plan is a living document that will be reviewed and updated over time to respond to employee behavior and transportatio n programs. The TDM Plan would implement a variety of TDM measures categorized in the following six TDM programs (Summary from Figure 4.1.5 on Page 25 of the NBS Master Plan TDM Plan; TDM reduction relative to an existing 67.5% SOV mode share) 2:
• Active Mobility (Estimated TDM Reduction of 15%)
o Walk/bike from shorebird residential; bicycle parking, shower and changing facilities; bicycle sharing; bicycle incentives; on-site bicycle repair facilities; bicycle buddy programs; bicycle giveaway program.
• Ridesharing and Car Sharing (Estimated TDM Reduction of 5%) o Priority parking for carpools and vanpools; rideshare matching services; subsidized or free vanpools or carpools; expanded carpool matching; and car sharing. • Shuttle and Transit (Estimated TDM Reduction of 30%)
o Shuttle services [including midday service and commute peak hour]; pre-tax commuter benefits; and commuter shuttle services [ranging from long haul, first-last mile connections, and public transit hubs].
• Flexible Work Schedule (Estimated TDM Reduction of 2%) o Flexible work schedules, and emergency ride home
• Marketing (Estimated TDM Reduction of 2%)
o On-site transportation coordinator; membership in the TMA; marketing and information. • Site Design and Other Measures (Estimated TDM Reduction of 10%) o Parking cashout; parking supply; [unbundled parking; parking pricing]; on-site amenities and services; funding district-wide services, other TDM measures.

With this TDM Plan in mind, this chapter evaluates the NBS Master Plan’s conformance with the North Bayshore District Trip Cap Policy for each of the three gateways at San Antonio Road, Rengstorff Avenue,

2 North Bayshore Transportation Demand Management (TDM) Plan Guidelines (2015) for non-residential development and the North Bayshore Residential Transportation Demand Management Guidelines (2018) Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
xxii
and Shoreline Boulevard, the three gateways combined, and the recommended North Bayshore District Trip Cap Policy trip targets where the Rengstorff and Shoreline gateways are combined. For the recommended North Bayshore Trip Cap Policy at Shoreline Boulevard and Rengstorff Avenue combin ed, the vehicle volume is less than the trip target during both peak periods and the NBS Master Plan is in conformance with the recommended North Bayshore Trip Cap Policy trip targets. Because the NBS Master Plan provides a general level of detail of the land use and transportation network, there will be a need to conduct additional transportation analysis during the PCP (Planned Community Permit) stage and may require subsequent site-specific transportation analysis to ensure that each mode of travel and the project site are designed and built to the City’s specifications.

Conclusion
The NBS Master Plan provides a general level of detail of the land use, transportation network, and project sites; therefore, there may be a need to conduct additional transportation analysis during the PCP (Planned Community Permit) stage and may require subsequent site-specific transportation analysis to ensure that each project site’s access and circulation, parking, and multimodal operations are designed and built to the City’s specifications.

The report indicates that even with priority transportation improvements and the NBPP improvements, with the addition of the project traffic, Shoreline Boulevard will operate with deficiencies, particularly in the evening peak hour for the southbound direction. Operations on Shoreline Boulevard indicates a need to develop additional strategies to better manage peak period congestion. A Shoreline Corridor Plan should be developed to develop traffic management strategies. Those strategies, after further evaluation, can be considered for future implementation in conjunction with Master Plan development phases.

Funding is needed to develop the Corridor Plan and help fund the improvement strategies.

In addition, implementation of the NBS Master Plan would result in adverse operational effects at several study intersections and would require intersection improvements to address the adverse effects. Because the project would contribute trips to the North Bayshore District, fair share contribution calculations are provided for City staff to develop fair share contributions for intersection improvements recommended in this report. Intersections with deficiencies and improvements are summarized in Table ES-4 and in more detail in Table 27 in Chapter 8. The peak hour fair share contributions of the NBS Master Plan are also included in Table 27. City staff intends to average the AM and PM peak hour fair share contribution estimates to determine the overall project contribution.

Exhibit 10

North Bayshore Master Plan: Transportation Analysis for the Environmental Review 1

1. Introduction and
Project Description
This report presents the results of the Multi-Modal Transportation Analysis (MTA) for the North Bayshore Master Plan (NBS Master Plan). Except for the Amphitheatre District garage (SA-P-1), the NBS Master Plan area is within the North Bayshore District and the North Bayshore Precise Plan (NBPP) area, which is generally bounded by the Shoreline at Mountain View Regional Park in the north, US 101 to the south, Stevens Creek to the east, and San Antonio Road to the west. The NBS Master Plan land uses are bounded by Huff Avenue, Bayshore Freeway, Pear Avenue, Charleston Road, and Stevens Creek.

The NBS Master Plan includes a combination of land use, transportation infrastructure, district parking, and transportation demand management program improvements. 3 To acknowledge the challenge of
accessing North Bayshore by vehicle and to be more compliant with the North Bayshore District Trip Cap Policy, the trip generation analysis presented in this report assumes the NBS Master Plan Transportation Demand Management (TDM) measures achieve a 35% morning peak hour inbound single -occupancy vehicle (SOV) mode share at the driveways for all non-residential development. Figure 1 shows the NBS Master Plan boundary and location within the NBPP as well as the surrounding transportation network.

This chapter discusses the MTA project context and analysis approach, project description, study area, analysis scenarios, report organization, and criteria for determining adverse effects.

1.1 Project Context and Analysis Approach
The purpose of the MTA is to perform a supplemental MTA that builds upon the Final Subsequent Environmental Impact Report for the North Bayshore Precise Plan (NBPP) (certified in November 2017) and the NBPP Transportation Impact Analysis (TIA) (July 2017). The MTA will conduct an evaluation of the internal street design, site access, and circulation with an emphasis on the pedestrian and bicycle access to the district parking and shuttle/transit stops along Charleston. To assess the effects of the district parking, focused vehicle operations and/or queuing analysis will be conducted at the four district parking structures within the NBS Master Plan area and the North Bayshore gateways. The MTA will also include an evaluation of the NBS Master Plan’s consistency with the North Bayshore District Trip Cap Policy, the North Bayshore Circulation Study, and site-specific Transportation Demand Management (TDM) Plan Policy requirements.

3 As allowed by the NBPP, the master planning process provides a coordinated and integrated approach to larger developments or areas under certain conditions. The process allows the City to achieve key Precise Plan objectives, while allowing projects flexibility and an administrative process focusing on key development objectives. The master planning process is outlined in section 3.5.2 of the NBPP.

Exhibit 10

Charleston Rd
Middlefield Rd
Rengstorff Ave
Fabian Way
Old Middlefield Way
San Antonio Rd
Moffett Blvd
Middlefield Rd
Central Expwy
Shoreline
Blvd
Leghorn St
Inigo Way
Shoreline Blvd
Alta Ave
Huff Ave
Joaquin Rd
Crittenden Ln
Stierlin Ct
Charleston Rd
Shore Bird Way
Macon Ave
Space Park Way
Pear Ave
La Avenida St
Bayshore Pkwy
Coast Ave
Casey Ave
Broderick
Way
Terminal Blvd
Plymouth St
Marine Way
GarciaAve
Charleston Rd
San Antonio Rd
San Antonio Rd
Amphitheatre Pkwy
Landings Dr
Stevens Creek
101
101
85 Shoreline at
Mountain View Regional Park
]
Permanente
Creek

0.25 Miles
North Bayshore Master Plan Boundary
North Bayshore Precise Plan Boundary
City of Mountain View
North Bayshore Master Plan Location
Figure 1
\\Fpsj03.fpainc.local\data\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\02_Focused_VMT\Fig01_NBSMP_Location.ai Exhibit 10

North Bayshore Master Plan: Transportation Analysis for the Environmental Review 3 The NBPP includes development standards, such as allowable land uses and parking requirements, and identifies new public improvements for the area. The NBPP complete streets and land use policies were developed to support active transportation and transit usage. The Mountain View 2030 General Plan envisions North Bayshore as a sustainable high-technology employment center with mixed land use and protected open spaces.

The previously completed NBPP TIA includes a transportation analysis for the entire NBPP area consistent with the transportation analysis requirements for a “very large land use project” outlined in the City of Mountain View’s Multi-Modal Transportation Analysis Handbook (February 2021). The NBPP TIA included the following analysis to evaluate all modes of travel, including pedestrian, bicycle, transit, and vehicle modes:
• Vehicle level of service for freeways and intersections • Transit delay analysis by route
• Light rail and bus capacity analysis
• Bicycle level of traffic stress for the street network in and near the NBPP area • Pedestrian and bicycle walk shed analysis from the light rail stations • Pedestrian and bicycle Quality of Service evaluation to evaluate the effects of transportation improvements
This MTA supplements the NBPP TIA, with guidance suggesting the following:
• Assess multi-modal site access using qualitative analysis methods • Review and provide comments on the North Bayshore Framework Master Plan • Perform motor vehicle operation analysis to identify vehicle intersection operational issue s at the North Bayshore gateways attributed to the NBS Master Plan • Summarize pedestrian and bicycle operations and multi-modal transportation improvements to address adverse effects on the transportation system near the shuttle and transit stops along Charleston Road and Shoreline Boulevard and near the district parking • Determine the NBS Master Plan’s consistency with transportation and parking policies and design elements of the NBPP
• Determine the NBS Master Plan’s consistency with the driveway trip targets and the North Bayshore District Trip Cap Policy

1.2 Project Description
As described below, the NBS Master Plan includes a land use program, transportation infrastructure and district parking improvements, and transportation demand management program measures. The NBS Master Plan describes an area covering approximately 151-acres which represents the land to which the North Bayshore Framework Master Plan applies. This Master Plan and related documents reference the vision, guiding principles, and planning controls set by the North Bayshore Precise Plan (NBPP).

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
4 1.2.1 Land Use Program
The NBS Master Plan would allow for the following land use changes as compared to what was on the ground in 2020.
• 7,000 residential units
◦ 5,600 market rate dwelling units with a mix of 60% studio and 1-bedroom, and 40% 2- and 3-bedrooms with a residential parking supply of 0.65 spaces per dwelling unit. ◦ 1,400 affordable rate dwelling units with a mix of 25% each of studio, 1-bedroom, 2-bedrooms, and 3-bedrooms and a residential parking supply rate of 0.69 spaces per dwelling unit. ▪ 1,050 affordable rate residential units will be facilitated via land dedication for stand -alone affordable housing.
▪ 350 affordable rate residential units will be provided as inclusionary units within the market- rate residential buildings.
• 3,145,897 square feet of office space with a parking supply rate of 2.0 spaces per 1,000 square feet ◦ 1,280,774 additional square feet of office building space ◦ 8,653 square feet of existing office space to be retained ◦ 1,642,061 square feet of research & development rebuilt as office space ◦ 92,497 square feet of industrial rebuilt as office space ◦ 121,912 square feet of vacant development rebuilt as office space 4 • 240,000 square feet of retail/commercial space
• 4,000 square feet of active space kiosks5
• 525 hotel rooms
• 55,000 square feet of community uses6
• 2,000 square foot police operations station with 10 parking spaces dedicated to the police department in the Amphitheatre parking garage (SA-P-1)

4 Vacant buildings for 2020 include the 91,392 square feet at 1400 North Shoreline Boulevard and 30,520 square feet at 1220-1230 Pear Avenue.
5 The 4,000 square feet of active space kiosks identified in the Greenway Park West, Greenway Park East, and The Portal is a local serving use that is assumed not to generate vehicle trips. 6 The 55,000 square feet of community uses is a local serving use that is assumed not to generate separate vehicle trips during a typical weekday, but rather attract walking and biking trips from the surrounding land uses.

Weekend programming of the community uses would generate additional vehicle trips outside of the typical weekday.

Exhibit 10

North Bayshore Master Plan: Transportation Analysis for the Environmental Review 5 The total change in residential, office, retail, hotel, and community uses is shown in Table 1. The Project also includes 240 public parking spaces and 10 police operations station parking spaces within the Amphitheater District Garage.

Table 1: North Bayshore Master Plan Land Use Program: Building Size Land Use1 Units
Existing Conditions
(2020)2
[A]
Project Conditions
(2030)
[B]
Change
[B-A=C]
Residential – Market Rate Dwelling Units 0 5,600 5,600 Residential – Affordable Dwelling Units 0 1,400 1,400
Office Square Feet 8,653 3,145,897 3,137,244
Research & Development Square Feet 1,642,061 0 -1,642,061 Industrial Square Feet 92,497 0 -92,497
Retail/Commercial Square Feet 0 240,000 240,000
Active Space Kiosk Square Feet 0 4,0003 4,000
Hotel Rooms 0 525 525
Community Uses Square Feet 0 55,0004 55,000
Police Operations Station Square Feet 0 2,000 2,000
Notes:

1. Because it is not a programmed land use, the 240 public parking spaces and 10 parking spaces for the police operations station that are added to Amphitheatre District Parking Garage is not included in this building summary.

2. Existing Conditions is relative to 2020. Vacant buildings for 2020 include the 91,392 square feet at 1400 North Shoreline Boulevard, and the 30,520 square feet at 1220-1230 Pear Avenue. These vacant and fenced off, the buildings at 1400 North Shoreline Boulevard and 1220-1230 Pear Avenue were not included in the 2020 baseline and therefore, do not show up as a demolished building credit because they are not occupied buildings.

3. The 4,000 square feet of active space kiosks identified in the Greenway Park West, Greenway Park East, and The Portal is a local serving use that is assumed not to generate separate vehicle trips during a typical day, but rather attract walking and biking trips from the surrounding land uses.

4. The 55,000 square feet of community uses is a local serving use that is assumed not to generate separate vehicle trips during a typical weekday, but rather attract walking and biking trips from the surrounding land uses. Weekend programming of the community uses would generate additional vehicle trips outside of the typical weekday.

Source: Fehr & Peers, 2023.

This project uses a combination of district parking and on-site parking for each land use. Each parking location will serve a combination of specified land uses. The parking location directly affects how vehicles travel on the local streets. The land use program is described by parking location in Table 2 and the parking locations are shown in Figure 3.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
6 Table 2: North Bayshore Master Plan Land Use Program: Building Size and Parking Location
Parking Location1 Parking
Spaces2
Residential:

Market
Rate
(Dwelling
Units)
Residential:

Affordable
(Dwelling
Units)
Office
(Square
Feet)3
Retail/
Commercial
Space
(Square
Feet)
Hotel
(Rooms)
Joaquin Neighborhood

1. District Garage (JN-P-1)4,5,6 500 0 0 0 35,000 0

2. North On-Site Parking 2,531 2,789 527 125,630 0 0

3. District Garage (JS-P-1)5,6 700 0 0 224,707 25,000 275

4. South On-Site Parking 746 720 294 25,000 0 0
Shorebird Neighborhood

5. District Garage (SB-P-1)5,6 600 0 0 0 180,000 250

6. On-Site Parking 1,826 1,832 328 162,160 0 0
Pear Neighborhood

7. On-Site Parking 331 259 251 0 0 0
Other Portions of the North Bayshore Master Plan

8. Amphitheatre District
Garage (SA-P-1)7,8 4,584 0 0 2,165,980 0 0

9. Marine Way District Garage
(MW-P-1 and MW-P-2) 890 0 0 444,420 0 0
Total of North Bayshore Master Plan
Total 12,708 5,600 1,400 3,147,897 240,000 525
Notes:

1. Parking locations serve certain land uses, depending on land use location and district parking management policy.

2. Parking spaces based on “Updated Car Parking” summary provided on October 19, 2022. Allocation of residential, office, and retail/commercial on-site parking spaces assumes that vehicles will park close to their desired destination; therefore, the on- site parking is distributed based on the land use allocation by neighborhood.

3. Assumes 90% of the office parking is assigned to the district garages (JN-P-1, JS-P-1, SA-P-1, MW-P-1, and MW-P-2) and 10% to the on-site parking locations in each neighborhood. The district office parking is distributed to district parking locations based on the number of designated office parking spaces available per district garage. The on-site parking is distributed to parking locations based on amount of office land use in each neighborhood.

4. Also serves residential visitor parking.

5. The 4,000 square feet of active space kiosks identified in the Greenway Park West, Greenway Park East, and The Portal is a local serving use that would not generate vehicle trips during a typical day, but rather attract walking and biking trips from the surrounding land uses. Retail/commercial space parking when needed for events or specific active use programming would be provided in JN-P-1, JS-P-1, and/or SB-P-1.

6. The 55,000 square feet of community uses is a local serving use that is assumed not to generate separate vehicle trips during a typical weekday, but rather attract walking and biking trips from the surrounding land uses. Community uses parking when needed for weekend events or specific active use programming would be provided in JN-P-1, JS-P-1, and/or SB-P-1.

7. The Amphitheatre District Parking Garage is the 4,334 parking spaces for the NBS Master Plan, 10 parking spaces for the police operations station, and 240 public parking spaces added to Amphitheatre District Parking Garage.

8. The office summary includes the 2,000 square foot police operations station.

Source: Fehr & Peers, 2023.

Exhibit 10

North Bayshore Master Plan: Transportation Analysis for the Environmental Review 7

1.2.2 Transportation Infrastructure and District Parking Improvements The project will also feature new streets and other transportation infrastructure (illustrated on Figure 2), and district parking (illustrated on Figure 3) including the following:
• New streets:
◦ Monarch Street is a proposed two-lane east-west Neighborhood Street with bicycle facilities that extends from Huff Avenue to Shoreline Boulevard. Monarch Street continues east of Shoreline Boulevard from Grove Street (new street) to Black Street. It will have a separated/buffered one - way bike lanes on each side of the street.
◦ C Street is a proposed two-lane north-south Neighborhood Street that extends south of Plymouth Street. It will have a separated/buffered one-way bike lanes on each side of the street. ◦ Grove Street is a proposed two-lane north-south Neighborhood Street that extends from Space Park Way to Shorebird Way. It will have a separated/buffered one-way bike lanes on each side of the street.
◦ Manzanita Street is a proposed two-lane north-south Neighborhood Street that extends from Space Park Way to Charleston Road. It will have a separated/buffered one-way bike lanes on each side of the street.
◦ Willow Street is a proposed two-lane north-south Neighborhood Street that extends from Monarch Street to Shorebird Way. It will have a separated/buffered one-way bike lanes on each side of the street.
◦ Inigo Way is a proposed two-lane north-south Neighborhood Street that extends from Space Park Way to Charleston Road. It will have a separated/buffered one-way bike lanes on each side of the street.
◦ Shorebird Way is proposed to be extended to the east as a Neighborhood Street to Black Street (new street). It will have a protected bidirectional cycle track on the north side of the street and a multi-use path will on the south side of the street.
◦ Black Street is a proposed two-way Access Street at the east terminus of Monarch Street extending north to Shorebird Way. It will have a separated/buffered one-way bike lanes on each side of the street. North of Shorebird Way, Black Street is proposed to be a one-way street with will have pedestrian access, bicycle access, and emergency vehicle access. • Modified streets:
◦ Huff Avenue between Plymouth Street and Charleston Road will be modified to a Neighborhood Street to include two travel lanes and separated one-way bike lanes on each side of the street. ◦ Joaquin Road between Plymouth Street and Charleston Road will be modified to a Neighborhood Street to include two travel lanes and a separated/buffered one-way bike lane on each side of the street.
◦ Shoreline Boulevard will be modified to be a 5-lane transit boulevard. It will have a separated/buffered one-way bike lane on each side of the street north of Space Park Drive.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
8 ◦ Shorebird Way is proposed to be extended to the east as a Neighborhood Street to Monarch Street (new street). Shorebird Way has three Existing Street versions:
▪ Shorebird Way 01 (Arrival) is a Neighborhood Street with one lane between Shoreline Boulevard and Manzanita Street. It will have the Green Loop, a bidirectional cycle track on one side of the street.
▪ Shorebird Way 02 (Greenway) is a Neighborhood Street with one lane between Manzanita Street and Inigo Way. It will have a bidirectional cycle track on one side of the street. ▪ Shorebird Way 03 (Wilds) is a 2-lane Neighborhood Street between Inigo Way and Black Street. It will have a protected bidirectional cycle track on the north side of the street and a multi-use path will on the south side of the street.
◦ Space Park Way will be modified to be a 2-lane Neighborhood Street. It will have a separated one-way bike lane on each side of the street.
◦ Charleston Road between Black Street and Inigo Way will be modified to a one-way street, with public pedestrian access, bicycle access, emergency vehicle access, and limited access for specific land uses proposed in the future.
• Parking will be composed of on-site parking and off-site District parking ◦ Residents will use on-site parking, while residential visitors will use District parking garages. ◦ 90% of office employees and visitors will use District parking garages, while 10% of office employees and visitors will use on-site parking.
• District parking at five locations within the Master Plan area include the following:
◦ JN-P-1 (Joaquin North) is located at the southwest corner of Monarch Street and Joaquin Road within the Joaquin North neighborhood and contains approximately 500 parking spaces. JN -P-1 serves retail uses and hotel, neighborhood parks, open spaces, and residential visitor parking. ◦ JS-P-1 (Joaquin South) is a 6-level parking garage location in the Joaquin South neighborhood that contains approximately 700 parking spaces. JS-P-1 serves office (450 parking spaces), and residential visitor parking, retail uses and hotel, neighborhood parks, and residential visitor parking (250 parking spaces).
◦ SB-P-1 (Shorebird) is located at the northeast corner of Space Park Way and Manzanita Street within the Shorebird neighborhood and contains approximately 600 spaces. SB-P-1 serves hotel, active uses, neighborhood parks, open spaces, and residential visitor parking. ◦ SA-P-1 (Amphitheatre) is a 6-level parking garage located at the northwest corner of Shoreline Boulevard and Charleston Road that contains approximately 4,584 parking spaces for the NBS Master Plan (4,330 parking spaces), the police operations center (10 parking spaces), and the public parking spaces (240 parking spaces). SA-P-1 serves office employee parking.

MW-P-1 & MW-P-2 (Marine Way) are 2- to 3-level parking garages along Marine Way that contain approximately 890 parking spaces. Both parking garages serve office uses.

Exhibit 10

North Bayshore Master Plan: Transportation Analysis for the Environmental Review 9 • On-site parking within each neighborhood7 is include the following:
◦ Joaquin North neighborhood includes 2,531 on-site parking spaces for office, residential, retail, and active land uses.
◦ Joaquin South neighborhood includes 746 on-site parking spaces for office, residential, retail and hotel land uses.
◦ Shorebird neighborhood includes 1,826 on-site parking spaces for office, residential, retail, hotel, and active land uses.
◦ Pear neighborhood includes 331 on-site parking spaces for residential, and retail land uses.

7 Allocation of residential, office, and retail/commercial on-site parking spaces to each neighborhood assumes that vehicles will park close to their desired destination; therefore, the on-site parking is distributed based on the land use allocation by neighborhood.

Exhibit 10
"z8„
)LJXUH/DQG8VH3ODQ
3ODQ1RWH


Q±ĉÑѕ‰įÕѕwă±ĉ

North Bayshore Master Plan - Land Use and Streets
Figure 2
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\NBS_MP_VMT\Fig02_NBSMP-LU_Streets.ai Source: North Bayshore Framework Master Plan (December 2022) "z8„
)LJXUH/DQG8VH3ODQ
3ODQ1RWH


Q±ĉÑѕ‰įÕѕwă±ĉ

Exhibit 10

0.25 Miles
1 ❷
3 ❹
5 ❻
❼
8 9

Charleston Rd
Old Middlefield Way
Leghorn St
Shoreline Blvd
Alta Ave
Huff Ave
Joaquin Rd
Crittenden Ln
Stierlin Ct
Charleston Rd
Shore Bird Way
Space Park Way
Pear Ave
La Avenida St
Plymouth St
Charleston Rd
Amphitheatre Pkwy
Landings Dr
Bayshore Pkwy
Coast Ave
Marine Way
San Antonio Rd
Rengstorff Ave
Casey Ave Broderick
Way
Garcia Ave
Stevens Creek
101
101
Permanente
Creek
Shoreline at
Mountain View Regional Park
]
North Bayshore Master Plan Boundary
District Garage
North On-Site Parking
Shorebird Neighborhood On-Site Parking
Pear Neighborhood On-Site Parking
South On-Site Parking
North Bayshore Precise Plan Boundary
City of Mountain View

0.25 Miles
North Bayshore Master Plan – Parking Locations
Figure 3
# Parking Location
Joaquin Neighborhood
1 District Garage (JN-P-1)
❷ North On-Site Parking
3 District Garage (JS-P-1)
❹ South On-Site Parking
Shorebird Neighborhood
5 District Garage (SB-P-1)
❻ On-Site Parking
Pear Neighborhood
❼ On-Site Parking
Other Portions of the North Bayshore
Master Plan
8 Amphitheatre District Garage (SA-P-1)
9 Marine Way District Garage (MW-P-1
and MW-P-2)
W:\San Jose N Drive\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\02_Focused_VMT\Fig_ES_3_NBSMP-Parking_Locations.indd Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
12 1.2.3 Transportation Demand Management Program Measures The proposed project will implement a TDM program to achieve a 35% morning peak hour inbound single-occupancy vehicle mode share at the development driveways (or district parking structures) for all non-residential development in the NBS Master Plan area. The project would implement various TDM measures consistent with the North Bayshore Transportation Demand Management (TDM) Plan Guidelines (2015) for non-residential development and the North Bayshore Residential Transportation Demand Management Guidelines (2018) for residential development.

At a minimum, the non-re sidential TDM plan
includes the following existing measures:
• Priority parking for carpools and vanpools
• Pre-tax commuter benefits
• On-site employee transportation
co
ordinator to serve as a liaison between the
employer/property owner and the
Transportation Management Association
(TMA) and to oversee the TDM program
• Bicycle parking, showers, and changing
facilities as defined in the bicycle parking
and amenities and standards
• Short-term bicycle parking
• Shared bicycles, if a bikeshare service is not
present in North Bayshore
• Telecommute/flexible work
schedule program
• Guaranteed ride home program
• Membership in the TMA
• Carpool matching services
• Shuttle services to connect employees to
local transit services
• Marketing of TDM programs to employees
Additional TDM measures are encouraged and
may be necessary to achieve the project’s mode
share and vehicle trip target. The non-residential
TDM program includes the following optional
TDM measures:
• Parking cash-out
• Parking supply, including priced parking
• Subsidized or free vanpools or carpools
• Biking incentives
• On-site bike repair facilities
• Bike buddy program
• Bike loaner program
• Expanded carpool matching
• Commuter shuttle services
• Car sharing
• On-site amenities and services
• Funding district wide services
The residential development will also include the
following TDM measures:
• Unbundled parking
• Membership in the TMA
• Short- and long-term secure bike parking
• Dedicated on-site car-share spaces
• On-site car-share vehicles (optional)
• Residential bikeshare (optional)
• Scooter-share program (optional)

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 13

1.3 Study Area
This MTA evaluates the potential transportation effects of the NBS Master Plan. The NBS Master Plan area is within the North Bayshore District and the NBPP, which is generally bounded by the Shoreline at Mountain View Regional Park in the North, US 101 to the South, Stevens Creek to the East, and San Antonio Road to the West.

1.3.1 Study Intersections
To evaluate the NBS Master Plan’s effect on roadway facilities, a total of 21 intersections were selected in consultation with City of Mountain View staff and guidance from the City of Mountain View’s Multi-Modal Transportation Analysis Handbook (February 2021). These locations are under the City of Mountain View or Palo Alto’s jurisdiction (refer to Figure 4 for study locations):

1. San Antonio Rd / Bayshore Pkwy*

2. San Antonio Rd / US 101 Northbound Ramps

3. Rengstorff Ave-Amphitheatre Pkwy / Garcia Ave-Charleston Rd

4. Rengstorff Ave / US 101 Northbound Ramps

5. Rengstorff Ave / US 101 Southbound Ramps

6. Rengstorff Ave / Leghorn St

7. Landings Dr / Charleston Rd

8. Alta Ave / Charleston Rd

9. Huff Ave / Charleston Rd

10. Joaquin Rd / Charleston Rd

11. Shoreline Blvd / Charleston Rd

12. Alta Ave / Plymouth St

13. Huff Ave / Plymouth St

14. Joaquin Rd / Plymouth St

15. Shoreline Blvd / Space Park Wy

16. Shoreline Blvd / Plymouth

17. Shoreline Blvd / Pear Ave

18. Shoreline Blvd / La Avenida – US 101 Northbound Ramps

19. Shoreline Blvd / US 101 Southbound Ramps

20. Shoreline Blvd / Space Park Way-Plymouth St. (future intersection)

21. Inigo Wy / La Avenida
* Denotes Palo Alto intersection.

Preliminary on-site intersection control recommendations are provided for the following intersections:
• Huff Ave / Monarch St
• Huff Ave / Plymouth St (Int. 13)
• C St / Plymouth St
• Joaquin Rd / Monarch St
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
14 • Joaquin Rd / Plymouth St (Int. 14)
• Shoreline Blvd / Monarch St
• Grove St / Shorebird Wy
• Grove St / Monarch St
• Grove St / Space Park Wy
• Manzanita St / Shorebird Wy
• Manzanita St / Monarch St
• Manzanita St / Space Park Wy
• New North-South St / Monarch St
• New North-South St / Space Park Wy
• Inigo Wy (West) / Space Park Wy
• Willow St / Shorebird Wy
• Willow St / Monarch St
• Inigo Wy / Charleston Rd
• Inigo Wy / Shorebird Wy
• Inigo Wy / Monarch St
• Inigo Wy (East) / Space Park Wy
• Shorebird Wy / Charleston Rd

Exhibit 10
North Bayshore Precise Plan Boundary
City of Mountain View
Shoreline at
Mountain View Regional Park
Permanente Creek
Stevens Creek
k e e r C e t n e n a m r e P
Existing Transit Service
Figure 4

0.5 Miles
Bayshore Rd
Rengstorff Ave
Old Middlefield Way
San Antonio Rd
Garcia Ave
Amphitheatre Pkwy
Rengstorff Ave
Middlefield Rd
Shoreline Blvd
Charleston Rd
Shoreline Blvd
Cri�enden Ln
S�erlin Ct
Space Park Wy
Pear Ave
La Avenida
Terra Bella Ave
Joaquin Rd
Huff AveAlta Ave
Leghorn St
Bayshore Pkwy
Plymouth St
Broderick Wy
Salado Dr
Coast Ave
Terminal Blvd
Casey Ave
Landings Dr
Charleston Rd
Macon Ave
Inigo Wy
Shore Bird Wy
Charleston Rd
£¤101
£¤101
|}85
Marine Wy1
2 3
4 5
6 7
8 9 10 11
12 13 14
15 16
17 18
19 2120
Future Study Intersection
Study Intersection
Project Locations
North Bayshore Master Plan
North Bayshore Precise Plan Boundary
City of Mountain View
101
85 Shoreline at
Mountain View Regional Park
Permanente Creek
Stevens Creek
k e e r C e t n e n a m r e P
W:\San Jose N Drive\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig04_NBSMP_Study Intersection.ai North Bayshore Master Plan – Study Intersections
Figure 4

0.5 Miles
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
16 1.4 Analysis Scenarios
The analysis was conducted during the morning peak hour occurring between 7:00 and 9:00 AM and the evening peak hour occurring between 4:00 and 6:00 PM for the following scenarios (refer to Table 3 for a summary of the scenario inputs):
• Scenario 1: Existing Conditions – Existing gateway counts (February 2020) and travel characteristics from the North Bayshore Transportation Monitoring Report and Near-Term Growth Assessment (May 2020) report.
• Scenario 2: Cumulative Conditions with NBPP Growth and the North Bayshore Master Plan Achieving a Modified Site-Specific TDM Plan Policy Goal with a Historical Vacancy Rate and Rengstorff Connector (Cumulative with Project Conditions) – Cumulative travel behavior based on the City of Mountain View travel model and the 2007 Association of Bay Area Governments (ABAG) land use projections for adjacent jurisdictions and planned and funded transportation system improvement in the Valley Transportation Plan (VTP) 2040. Within the NBPP boundary, this scenario includes the following:
◦ The NBPP growth with the NBS Master Plan from Existing Conditions (2020):
▪ 9,098 residential units
▫ 7,605 market rate dwelling units
▫ 1,493 affordable rate dwelling units
▪ 5,587,216 square feet of office space
▫ 3,487,472 additional square feet of office building space ▫ 1,900,011 square feet of research & development rebuilt as office space ▫ 199,733 square feet of industrial rebuilt as office space ▪ 343,496 square feet of retail/commercial land uses (retail, restaurant, or service commercial) ▪ 725 hotel rooms
▪ 98,000 square foot athletic club
▪ 88,500 square foot theater
◦ The North Bayshore transportation improvements presented in Figure 5 and listed in Table 4. ◦ The locations of the development projects are presented in Figure 6 and Table 5 presents a summary of their associated land use assumptions (which in some cases involve demolition of existing buildings as well as construction of new buildings). ◦ Non-NBS Master Plan market rate residential housing mix of 70% studio and 1-bedroom apartments and 30% 2- and 3-bedroom apartments with a residential parking supply rate of 0.6 spaces per dwelling unit.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 17 ◦ NBS Master Plan market rate residential housing (mix of 60% studio and 1-bedroom apartments and 40% 2- and 3-bedroom dwelling units) with a reduced residential parking supply rate of 0.65 spaces per dwelling unit.
◦ NBS Master Plan affordable residential housing mix of 25% studio, 1-bedroom, 2-bedroom, and 3-bedroom dwelling units with a reduced parking supply rate of 0.69 spaces per dwelling unit. ◦ Existing non-Google development (6% of non-residential development) achieves 69%8 morning peak hour inbound single-occupancy vehicle mode share.
◦ Existing Google, future Google, and future non-Google non-residential development achieving a 35% morning peak hour inbound single-occupancy vehicle mode share (94% of non-residential development).9 The NBS Master Plan will achieve the 35% SOV per its project description. T his scenario assumes the remainder of existing and future Google development will achieve the 35% SOV too.
◦ Non-residential development includes a mixed-use trip reduction applied to existing and future development to account for the additional residential opportunities in North Bayshore that allow some current workers to live nearby.
◦ All North Bayshore non-residential development includes a 7% historical vacancy rate. 10 ◦ NBS Master Plan parking at a ratio of 2.0 parking spaces per 1,000 square feet of office space. ◦ On-site and District parking as shown in the NBS Master Plan (e.g., JS-P-1, JN-P-1, SA-P-1, SB-P-1, MW-P-1, and MW-P-2) (refer to Figure 3).

8 The 69% morning peak hour inbound single-occupancy vehicle mode share is derived from the observed 80% mode share (Intuit Building 20 Vehicle Trip Generation and Mode Share Monitoring memorandum, Fehr & Peers, May 2019) with an adjustment for internalized trips of North Bayshore employees living and working in North Bayshore. 9 Certain approved non-Google projects in North Bayshore have been conditioned to achieve a 45% morning peak hour inbound single-occupancy vehicle mode share. Per staff direction, these projects were evaluated using the 35% standard for this analysis.
10 A vacancy rate expresses the portion of building square footage that is unoccupied. A vacancy rate allows owners to offer non-residential development options to meet a tenant’s needs at a market rate price without over supplying non-residential development. Based on conversations with local real estate brokers during the General Plan and City of Mountain View travel model update, City staff established a 7% historical vacancy rate. This vacancy rate has been used in previous versions of the North Bayshore Precise Plan transportation analysis and the City of Mountain View General Plan transportation analysis.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
18 Table 3: Summary of Scenario Characteristics
Characteristic Unit
Scenario 1:

Existing
Conditions
Scenario 3:

Cumulative with
Project Conditions
North Bayshore Precise Plan Land Use Program
Residential Units Dwelling Units
Refer to
Table 13 for Total
Building Area in
North Bayshore
9,098
Market Rate Dwelling Units 7,605
Affordable Dwelling Units 1,493
Office Square Feet 5,587,216
New Office Square Feet 3,590,985
Rebuilt R&D or Industrial as New Office Square Feet 1,996,231 Retail/Commercial1 Square Feet 343,496
Hotel Rooms Rooms 725
Athletic Club Square Feet 98,000
Theater Square Feet 88,500
Shoreline at Mountain View Growth Daily Trips 0
North Bayshore Transportation Improvements
Transportation Improvements Refer to Table 4 for the
Priority Transportation Improvements by Scenario
Housing Characteristics
Studio and 1-Bedroom Dwelling Units Percent
N/A
70/60/502
2- and 3-Bedroom Dwelling Units Percent 30/40/502
Residents Parking Supply Rate3 Spaces per Dwelling
Unit 0.60/0.65/0.692
Morning Peak Hour Inbound Single Occupancy Mode Share for Non-Residential Development Existing Non-Google Development Percent 804 69
Future Non-Google Development Percent N/A 355
Existing Google Development Percent 506 35
Future Google Development Percent N/A 35
Effective District-Wide Percent 537 378
Historical Vacancy Rate
Vacancy Rate9 Percent 0.5 7
Notes:

1. Retail/Commercial uses include retail, restaurant, and service commercial land use.

2. Non-NBS Master Plan market rate residential housing mix/NBS Master Plan market rate residential housing mix/NBS Master Plan market rate residential housing mix.

3. Residents parking supply rate does not include residential visitor parking supply.

4. Based on Intuit Building 20 Vehicle Trip Generation and Mode Share Monitoring memorandum, May 2019.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 19

5. Certain approved non-Google projects in North Bayshore have been conditioned to achieve a 45% morning peak hour inbound single-occupancy vehicle mode share. Per staff direction, these projects were evaluated using the 35% standard for this analysis.

6. Based on Google employee mode share survey, adjusted to reflect mode share for all trips (in addition to employee trips) that occur at non-residential developments.

7. Effective district-wide morning peak hour single-occupancy vehicle rate derived from spring 2020 North Bayshore District Transportation Monitoring and Near-Term Growth Assessment (May 2020), North Bayshore Framework Master Plan Appendix C: TDM Plan (August 2021), and employment weightings of approximately 11% non-Google development and 89% Google development provided by City staff.

8. Effective district-wide morning peak hour single-occupancy vehicle rate for Scenario 3 is based on employment weightings of approximately 6% for existing non-Google development, 14% for future non-Google development, 52% for existing Google development, and 28% for future Google development.

9. A vacancy rate expresses the portion of building square footage that is unoccupied.

Source: City of Mountain View travel model and Fehr & Peers, 2023.

Exhibit 10
Transportation Improvement
Newly Constructed
Under Construction
Approved/Pending Projects
North Bayshore Master Plan Boundary
North Bayshore Precise Plan Boundary
City of Mountain View
Project Locations
North Bayshore Master Plan Improvements
Approved/Pending Improvements
Under Construction Improvements
Newly Constructed Improvements
North Bayshore Precise Plan Transportation Improvement Projects Figure 5
\\Fpsj03.fpainc.local\data\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig05_NBSPP_Transportation Improvement Projects.ai

0.5 Miles
11 14
15 10
8 7
22 21
9 12
20 17
13 16
18 2 3 1
4 6
19 23
25 24
5 Charleston Rd
Fabian Way
Old Middlefield Way
Moffett Blvd
Middlefield Rd
Leghorn St
Inigo Way
Alta Ave
Huff Ave
Joaquin Rd
Plymouth St
Crittenden Ln
Stierlin Ct
Charleston Rd
Macon Ave
Space Park Way
Pear Ave
La Avenida St
Salado Dr
Bayshore Pkwy
Casey
Ave
Broderick
Way
Terminal Blvd
Garcia Ave
Landings Dr
San Antonio Rd
San Antonio Rd
Rengstorff Ave
£¤101
£¤101
·|}ÿ85
Stevens Creek
Permanente
Creek
Shoreline at
Mountain View Regional Park
]
Shorebird Way
Shoreline Blvd
Amphitheatre Pkwy
Coast Ave
Marine Way
Exhibit 10

Charleston Rd
Middlefield Rd
Rengstorff Ave
Fabian Way
Old Middlefield Way
San Antonio Rd
Moffett Blvd
Middlefield Rd
Central Expwy
Shoreline
Blvd
Leghorn St
Inigo Way
Shoreline Blvd
Alta Ave
Huff Ave
Joaquin Rd
Crittenden Ln
Stierlin Ct
Charleston Rd
Shore Bird Way
Macon Ave
Space Park Way
Pear Ave
La Avenida St
Bayshore Pkwy
Coast Ave
Marine Way
Casey Ave
Broderick
Way
Terminal Blvd
Plymouth St
GarciaAve
Charleston Rd
San Antonio Rd
San Antonio Rd
Amphitheatre Pkwy
Landings Dr
9 5
2 1
7 5
3 4 8
11 12
13 13
13 13
13 10
13 Stevens Creek
101
101
85 Shoreline at
Mountain View Regional Park
]
Permanente
Creek

0.25 Miles
Project Locations
Newly Constructed
Under Construction
1 Intuit - Marine Way
2 Intuit - Bayshore Parkway
3 Landings
4 Broadreach
5 Charleston East
6 Shashi
7 Sobrato - 1255 Pear Office
8 Sobrato - Mixed Use
(1255 Pear Office and Residential)
10 Huff Garage
12 Gateway Master Plan (non NBS MP)
13 North Bayshore Master Plan
11 1100 La Avenida Affordable
Housing
9 Microsoft
Approved/Pending Projects
North Bayshore Master Plan Boundary
North Bayshore Precise Plan Boundary
City of Mountain View
North Bayshore Precise Plan Growth Project Locations
Figure 6
\\Fpsj03.fpainc.local\data\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\02_Focused_VMT\Fig05_NBSPP_Growth Project Locations.ai Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
22 Table 4: North Bayshore Precise Plan Transportation Improvements ID Facility Extent of
Improvement Description of Improvement Source of
Improvement1
Circulation
Study2
Used in
Scenario(s)
1 East-West Bicycle
connection
Shoreline Blvd to
Stevens Creek Trail
(between Charleston
Rd and Plymouth St)
Buffered bicycle lanes. NBPP T-6 All Scenarios
(1 and 2)
2 East-West Greenway
Connection #1
Alta Ave and
Shoreline Boulevard
(between Charleston
Rd and Plymouth St)
Multiuse path. NBPP T-6 All Scenarios
(1 and 2)
3 Shoreline Blvd
Signalized Bicycle
Crossing
East-West Greenway
#2 at Shoreline Blvd Signalized bicycle crossing at Shoreline Blvd. NBPP T-9 All Scenarios (1 and 2)
4 San Antonio Rd and
Bayshore Pkwy At intersection
Provide additional northbound right-turn lane storage (240 feet) and eastbound left-turn lane storage (130 feet).

Reconfigure the eastbound approach with a separate left- turn lane and a shared through-right-turn lane. (The City implemented a modified westbound approach with a left-
turn lane, and a shared left-through-right lane)

NBPP EIR
Mitigation All Scenarios
(1 and 2)
5 Shoreline Boulevard
and Plymouth Street At Intersection Signalize intersection Other City Improvement Scenario 1
6 Charleston Road
Charleston Road
between Huff Avenue
and Shoreline
Boulevard
Charleston Road Transit Corridor improvements NBPP T-3 C-1 All Scenarios (1 and 2)
7 East-West Greenway
Connection #1
Alta Avenue to
Landings Office
Development
Multiuse path
NBPP T-6 and
Landings
Development
Improvement
Scenario 2
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 23 ID Facility Extent of
Improvement Description of Improvement Source of
Improvement1
Circulation
Study2
Used in
Scenario(s)
8 Rengstorff Ave-
Amphitheatre Pkwy and
Garcia Ave-Charleston
Rd
At Intersection Signal timing modifications Other City
Improvement Scenario 2
9 Shoreline Blvd and
Pear Ave At intersection
Construct a separate northbound right-turn lane with 300- foot storage pocket. Modify the westbound approach as a left-turn lane and one shared through-right lane with
east/west split phasing.

NBPP EIR
Mitigation C-5 Scenario 2
10 Plymouth St
Realignment
At the new
intersection of
Shoreline Blvd and
Plymouth St-Space
Park Way
Re-align Plymouth St with Space Park Way with
signalization and protected phasing. (Eastbound and
westbound left turn and shared through-right; Northbound approach with two left turns, one shared through-right; and southbound approach with left turn, one through, one shared through-right). The two northbound left-turn lanes should be 425 feet long to minimize queue spillback
during the morning peak hour.

NBPP T-5 C-2 Scenario 2
11 Shoreline Blvd / US 101
Northbound Off-Ramp
La Avenida to
US 101 Mainline
Re-align US 101 off-ramp to Shoreline Blvd with removal of the east leg from US 101. Creation of a new intersection of La Avenida and US 101 northbound ramps east of
Shoreline Boulevard with two northbound left-turn lanes and two northbound right-turn lanes.

NBPP T-16 C-4 Scenario 2
12 Local north-south
street
La Avenida and
Space Park east of
Shoreline Blvd
Two-lane street with bicycle lanes and sidewalks
(with dog leg).

NBPP T-10 and
Sobrato
Development
Improvement
Scenario 2
13 Joaquin Rd Charleston Rd to
Amphitheatre Pkwy Two-lane street with bicycle lanes and sidewalks.

Charleston East
Development
Improvement
Scenario 2
14 Shoreline Boulevard
Reversible Transit Lane
Pear Avenue to
Middlefield Road
Center-running, reversible transit lane extending from
Middlefield Avenue north to Pear Avenue. Remove
signalized Shoreline Boulevard and Plymouth Street
intersection (Project 5)
NBPP T-17
and T-18 C-5 Scenario 2
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
24 ID Facility Extent of
Improvement Description of Improvement Source of
Improvement1
Circulation
Study2
Used in
Scenario(s)
15 US 101 Bicycle and
Pedestrian Path
Terra Bella Ave to
Plymouth St Multiuse path NBPP T-1
and T-8 C-3 Scenario 2
16 Charleston Road Huff Avenue to
Amphitheatre Pkwy Charleston Road Transit Corridor
improvements
NBPP T-3 C-1 Scenario 2
17 Charleston Road Amphitheatre Pkwy
to Salado Drive Charleston Road Transit Corridor
improvements
NBPP T-4 C-1 Scenario 2
18 Amphitheatre
Permanente Creek
Trail to Shoreline
Boulevard
Amphitheatre Parkway widening from three-lane street
(one eastbound lane and two westbound lanes) to a four- lane street (two lanes in each direction).

NBPP T-14 C-19 Scenario 2
19 Shoreline Boulevard
and Plymouth Street
At Intersection Add a second northbound left-turn lane

NBPP EIR
Mitigation and
Landings
Development
Improvement
Scenario 2
20 Inigo Way Extension Space Park Way to
Charleston Road
Two-lane Neighborhood Street with sidewalk and buffered bicycle lanes at the minimal NBPP T-10 Scenario 2
21 Frontage Road Landings Drive to
Permanente Creek
Two-lane Access Street with sidewalk and buffered bicycle lanes at the minimal NBPP T-11 C-6 Scenario 2
22 Frontage Road Permanente Creek to
Alta Avenue
Two-lane Access Street with sidewalk and buffered bicycle lanes at the minimal
NBPP T-11 and
Landings
Development
Improvement
C-11 Scenario 2
23 Shoreline Boulevard
Reversible Transit Lane
Charleston Road to
Plymouth Street-
Space Park Way
Center-running, reversible transit lane extending from
Charleston Road and Plymouth Street-Space Park Way.

Circulation
Study C-10 Scenario 2
24 Rengstorff Connector –
Frontage Road
Landings Drive
extended to
Rengstorff Avenue
Landings Drive extended as a two-lane street to Rengstorff Avenue and forms the eastern leg of a new interchange
intersection.

Circulation
Study C-12 Scenario 2
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 25 ID Facility Extent of
Improvement Description of Improvement Source of
Improvement1
Circulation
Study2
Used in
Scenario(s)
25 Rengstorff Connector –
US NB Ramp
Realignment
US 101 Ramp
Realignment US 101 direct off-ramps and on-ramps realigned. Circulation Study C-13 Scenario 2 Notes:

1. From Figure 55: Priority Transportation Improvements and Table 27: Priority Transportation Improvements in the North Bayshore Precise Plan (2017), Final Subsequent Environmental Impact Report for the North Bayshore Precise Plan (2017) or stated development improvement.

2. From Figure 5: North Bayshore Priority Transportation Improvement and Table 1: North Bayshore Priority Transportation Improvements – Approved 2021 Update in the North Bayshore Circulation Study (December 2021).

Source: Fehr & Peers, 2023.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
26 Table 4: North Bayshore Building Size of New Projects and Demolition/Remodel of Existing Buildings (Changes from 2020) Project Industrial
(s.f.)
Recreation
(s.f.)
Multi-
Family
(Dwelling
Units)
Hotel
(Rooms) Office (s.f.) R&D (s.f.) Restaurant
(s.f.) Retail (s.f.) Service (s.f.)
Approved and Under Construction Projects
Intuit (Bayshore Parkway) +178,600
Microsoft +643,680
Sobrato - 1255 Pear Ave. Mixed-
Use Office and Residential +223 +231,210
Sashi Hotel +200 +4,400 +4,000
Charleston East +595,000 +10,000
1100 La Avenida Affordable
Housing -3,723 +93 -8,726
Landings and Huff Garage -4 +799,482 -249,224 +10,096 Net Total Approved and Under
Construction Projects -3,723 312 200 2,447,972 -257,950 4,400 24,096 Pending Projects
Gateway Master Plan (Non-
Google) +100,000 +1,786 +75,000
Net Total Pending Projects 100,000 1,786 75,000
Project (North Bayshore Master Plan)
North Bayshore Master Plan (Total
Uses) +55,0001 +7,000 +525 +3,147,8972 +240,0003
North Bayshore Master Plan
(Demolished Uses) -92,497 -8,653 -1,642,0614
North Bayshore Master Plan
(Project) (Net New) -92,497 55,000 7,000 525 3,139,244 -1,642,061 0 240,000 Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 27 Project Industrial
(s.f.)
Recreation
(s.f.)
Multi-
Family
(Dwelling
Units)
Hotel
(Rooms) Office (s.f.) R&D (s.f.) Restaurant
(s.f.) Retail (s.f.) Service (s.f.)
Total Changes from 2020
Total New Development 155,000 9,098 725 5,595,869 79,400 264,096 Total Demolished Development -96,220 -8,653 -1,900,011 Total -96,220 155,000 9,098 725 5,587,216 -1,900,011 79,400 264,096 Notes:

1. The 55,000 square feet of community uses is a local serving use that is assumed not to generate separate vehicle trips during a typical weekday, but rather attract walking and biking trips from the surrounding land uses. Weekend programming of the community uses would generate additional vehicle trips outside of the typical weekday.

2. The 2,000 square foot police operations station is included in the NBS Master Plan office land use summary.

3. The 4,000 square feet of active space kiosks identified in the Greenway Park West, Greenway Park East, and The Portal is a local serving use that is assumed not to generate vehicle trips during a typical day, but rather attract walking and biking trips from the surrounding land uses and are not included in this summary.

4. Existing Conditions is relative to 2020. Vacant buildings for 2020 include the 91,392 square feet at 1400 North Shoreline Boulevard, and the 30,520 square feet at 1220-1230 Pear Avenue. These vacant buildings at 1400 North Shoreline Boulevard and 1220-1230 Pear Avenue were not included in the 2020 baseline and therefore, do not show up as a demolished building credit.

Source: Fehr & Peers, 2023.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
28 1.5 Criteria For Determining Adverse Effects
The criteria for determining adverse effects are presented in the Multi-Modal Transportation Analysis Handbook and are summarized in Table 5.

Table 5: Criteria for Determining Adverse Effects and Operational Deficiencies Criteria # Determination of Adverse Effect and Operational Deficiency Site Access and Circulation
1 Project designs for pedestrian, bicycle, and automobile on-site circulation, access, loading, and parking areas fail to meet City or industry standard design practices.
2 The project fails to provide adequate accessibility for services and delivery trucks on site, including access to truck loading areas.

Motor Vehicle Operations
3 City Signalized Intersection: Intersection operations degrade from an acceptable level to an unacceptable level.
4 City Signalized Intersection: Exacerbates unacceptable operations by increasing the average critical delay by four seconds or more and increasing the critical volume-to-capacity (V/C) ratio by 0.01 or more. 5 City Signalized Intersection: Increases the V/C ratio by 0.01 or more at an intersection with unacceptable operations when the change in critical delay is negative (i.e., decreases). This can occur if the critical movements change. 6 City Unsignalized Intersection: Adverse effects are said to occur when the addition of project traffic causes the average intersection delay for an all-way stop-controlled intersection, or the worst movement/approach for a side-street stop- controlled intersection, to degrade to LOS F and the intersection satisfies the peak hour traffic signal warrant from the California Manual of Uniform Traffic Control Devices (MUTCD) (2014).

Traffic Calming and Neighborhood Intrusion
7 A project meets the threshold set by the City’s adopted Neighborhood Traffic Management Program (NTMP). 8 Traffic calming devices or other traffic control is identified in an adopted plan. 9 In conformance with the City’s Vision Zero Policy, projects proactively implement traffic calming devices to meet the City’s multi-modal and safety goals.

Pedestrian Operations
10 The project fails to provide accessible and safe pedestrian connections between buildings and adjacent streets and transit facilities.
11 A project disrupts existing or planned pedestrian facilities or conflicts with adopted City non-auto plans, guidelines, policies, or standards.
12 The project adds trips to an existing transportation facility (e.g., sidewalk) that does not meet current design standards. 13 The project increases vehicle trips to a roadway with a Pedestrian Quality of Service (PQOS) score of 3 or more.

Bicycle Operations
14 The project disrupts existing or planned bicycle facilities or conflicts with adopted City non-auto plans, guidelines, policies, or standards.
15 The project adds trips to an existing transportation facility (e.g., bikeway) that does not meet current design standards.

The project increases vehicle trips to a roadway with a bicycle Level of Traffic Stress (BLTS) score of 3 or 4. 16 The project does not connect to the city’s low-stress (LTS 1 to 2) bike network.

Parking
17 The project increases off-site parking demand in the project area. 18 The project proposes more parking than allowed by the City's Zoning Code. 19 The project parking results in significant spillover into adjacent neighborhoods. 20 Parking reduction requires parking study to demonstrate effective parking management and adequate parking to serve project.

Source: City of Mountain View MTA Handbook – Version 1.0 (February 2021), Table 4.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 29

1.6 Report Organization
The following chapters are included in this report to meet City requirements for evaluating transportation effects of the NBS Master Plan:
• Chapter 2 – Relevant Transportation Agencies, Plans, and Policies lists the City of Mountain View’s General Plan polices; the City-specific land use and transportation plan goals, policies, and standards; and the federal, state, regional, and county jurisdictions plans that could be affected by this project.

The City policy conformance assessment evaluates if the project would conflict with such plans and policies.
• Chapter 3 – Existing Conditions describes the transportation system near the project site, including the surrounding roadway network; morning and evening peak hour turning movement volumes at the study intersections; existing bicycle, pedestrian, and transit facilities; intersection levels of service; freeway segment levels of service; and field observations. • Chapter 4 – Site Access and On-Site Circulation describes project access and circulation for all travel modes. This evaluation focuses on accessibility for all users, multi-modal access and circulation, existing street facilities, emergency vehicle access, and loading areas for various vehicle types. • Chapter 5 – Traffic Forecasts summarizes the forecast methods including the driveway and North Bayshore gateway trip generation, and City of Mountain View travel model overview. • Chapter 6 – Motor Vehicle Operations Methods describes the traffic analysis used for the operation analysis chapters.
• Chapter 7 – Cumulative Conditions presents Cumulative Conditions with NBPP Growth and the North Bayshore Master Plan Achieving a Modified Site-Specific TDM Plan Policy Goal, with a Historical Vacancy Rate and Rengstorff Connector within the NBPP boundary. • Chapter 8 – Adverse Motor Vehicle Effects and Improvements describes the project’s effects on intersection operations and identifies improvements to address adverse effects caused by the project. • Chapter 9 – Traffic Calming describes whether the street layouts and the traffic calming features within the project conform with the NBPP requirements.
• Chapter 10 – Pedestrian Operations provides supplemental pedestrian facilities analysis by highlighting the pedestrian NBPP transportation improvements that are near the project site and summarizing the potential increase in pedestrian activity due to this project. This chapter also summarizes accessible paths from streets, a pedestrian shed analysis, and parking lots to building entrances for this project.
• Chapter 11 – Bicycle Operations provides supplemental bicycle facilities analysis by highlighting the NBPP bicycle transportation improvements that are near the project site and summarizing the potential increase in bicycle activity due to this project. This chapter also summarizes a bicycle shed analysis for this project site.
• Chapter 12 – Parking Assessment describes the existing parking facilities and conditions and the project’s parking management strategies and parking supply. The project parking supply is summarized and compared to the parking requirements.
• Chapter 13 – Transportation Demand Management describes the TDM plan, the trip generation by land use, and the peak hour vehicle trip generation at each of the three gateways under Cumulative with Project Conditions.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
30 2. Relevant Transportation Agencies,
Plans, and Policies
This chapter provides a summary of regional circulation and transportation plans that are relevant to this project. The Metropolitan Transportation Commission’s (MTC) Regional Transportation Plan provides a roadmap for accommodating projected household and employment growth in the ni ne-county Bay Area by 2040 as well as a transportation investment strategy for the region. The Santa Clara Valley Transportation Authority (VTA) VTP 2040 Plan describes all major projects in Santa Clara Valley over the next 20 years. The Santa Clara Countywide Bicycle Plan’s primary goal was to make it easier and safer for people to bike when traveling from one city to the next in Santa Clara County. The Congestion Management Program Monitoring and Conformance Report sets state and federal funding prioritie s for transportation improvements affecting the Santa Clara County Congestion Management Program (CMP) transportation system.

The City of Mountain View General Plan 2030 includes mobility goals aimed to enhance travel by all modes by encouraging use by non-auto modes and thus reduce vehicle trips. AccessMV: Comprehensive Modal Plan is a multi-modal plan to provide a consistent vision for the city’s multi-modal transportation network. The Mountain View Vision Zero Policy is policy to eliminate fatal traffic collisions in Mountain View by 2030. The North Bayshore Precise Plan implements the General Plan’s goals and policies for the North Bayshore Change Area and establishes the area’s land use and development regulations. The North Bayshore Circulation Study is an advisory document that resulted in recommendations for the Priority Transportation Improvements, single-occupancy vehicle trip rate for non-residential development, and a modified North Bayshore Trip Cap Policy definition.

2.1 Metropolitan Transportation Commission’s (MTC) Regional Transportation Plan (Plan Bay Area)
Plan Bay Area 205011 is a joint regional planning document overseen by the MTC and the Association of Bay Area Governments (ABAG). It serves as the region’s Sustainable Communities Strategy (SCS) pursuant to SB 375 and the 2050 RTP (preceded by Plan Bay Area 2040) and integrates four elements (Housing, Economy, Transportation, and Environment) and five guiding principles (affordable, connected, diverse, healthy, and vibrant) to manage greenhouse gas (GHG) emissions and plan for future population growth.

Most of the investments are directed toward residents of Equity Priority Communities or other systematically underserved communities. The plan envisions investment in affordable housing producti on and preservation, a universal basic income to support residents’ essential needs, investments in means -

11 Metropolitan Transportation Commission, 2021. Plan Bay Area 2050. Available online at Plan Bay Area 2050 | Plan Bay Areahttp://2040.planbayarea.org/.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 31 based transit fare discounts, and subsidies to protect homes and businesses from natural hazards. The following strategies are included:
• Housing Strategies
◦ Protect and Preserve Affordable Housing
▪ H1. Further strengthen renter protections beyond state law ▪ H2. Preserve existing affordable housing
◦ Spur Housing Production for Residents of All Income Levels ▪ H3. Allow a greater mix of housing densities and types in Growth Geographies ▪ H4. Build adequate affordable housing to ensure homes for all ▪ H5. Integrate affordable housing into all major housing projects ▪ H6. Transform aging malls and office parks into neighborhoods ◦ Create Inclusive Communities
▪ H7. Provide targeted mortgage, rental, and small business assistance to Equity Priority Communities
▪ H8. Accelerate reuse of public and community-owned land for mixed-income housing and essential services
• Economic Strategies
◦ Improve Economic Mobility
▪ EC1. Implement a statewide universal basic income
▪ EC2. Expand job training and incubator programs
▪ EC3. Invest in high-speed internet in underserved low-income communities ◦ Shift the Location of Jobs
▪ EC4. Allow greater commercial densities in Growth Geographies ▪ EC5. Provide incentives to employers to shift jobs to housing-rich areas well served by transit ▪ EC6. Retain and invest in key industrial lands
• Transportation Strategies
◦ Maintain and Optimize the Existing System
▪ T1. Restore, operate, and maintain the existing system ▪ T2. Support community-led transportation enhancements in Equity Priority Communities ▪ T3. Enable a seamless mobility experience
▪ T4. Reform regional transit fare policy
▪ T5. Implement per-mile tolling on congested freeways with transit alternatives Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
32 ▪ T6. Improve interchanges and address highway bottlenecks ▪ T7. Advance other regional programs and local priorities ◦ Create Healthy and Safe Streets
▪ T8. Build a Complete Streets network
▪ T9. Advance regional Vision Zero policy through street design and reduced speeds ◦ Build a Next-Generation Transit Network
▪ T10. Enhance local transit frequency, capacity, and reliability ▪ T11. Expand and modernize the regional rail network
▪ T12. Build an integrated regional express lanes and express bus network • Environmental Strategies
◦ Reduce Risk from Hazards
▪ EN1. Adapt to a sea level rise
▪ EN2. Provide means-based financial support to retrofit existing residential buildings ▪ EN3. Fund energy upgrades to enable carbon neutrality in all existing commercial and public buildings
◦ Expand Access to Parks and Open Space
▪ EN4. Maintain urban growth boundaries
▪ EN5. Protect and manage high-value conservation lands ▪ EN6. Modernize and expand parks, trails, and recreation facilities ◦ Reduce Climate Emissions
▪ EN7. Expand commute trip reduction programs at major employers ▪ EN8. Expand clean vehicle initiatives
▪ EN9. Expand transportation demand management incentives Major transit projects included in Plan Bay Area 2050 include a BART extension to San José/Santa Clara, Caltrain electrification, enhanced service along the Amtrak Capitol Corridor, and improvements to local and express bus services.

2.2 Santa Clara Valley Transportation Authority VTP 2040 Santa Clara Valley Transportation Authority (VTA), the countywide transportation authority, has adopted the Valley Transportation Plan (VTP) 2040 (adopted in October 2014) that describes all major projects and initiatives expected to occur in the next 20 years. It prioritizes complete streets, express lanes, light rail effectiveness upgrades, bus rapid transit, and bicycle/pedestrian improvements.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 33 Most recently, the Phase 3 of the US 101 and State Route (SR) 85 Express Lanes Project converted the existing single carpool lanes to express lanes on US 101 from near SR 237 to SR 85 in Mountain View and SR 85 from SR 237/Grant Road to the US 101/SR 85 interchange. Also, the existing double carpool lane on US 101 between the San Mateo County line to the US 101/SR 85 interchange was c onverted to double express lanes. The VTA 2040 Plan also includes a package of projects in the North Bayshore Precise Plan area including the electrification of Caltrain, express lane projects along US 101, SR 237 and SR 85, US 101 southbound improvements from San Antonio Road to Rengstorff Avenue, and Permanente Creek Trail grade separation at Charleston Road and extensions of Permanente Creek Trail to Middlefield Road.

2.3 Santa Clara Countywide Bicycle Plan
The Santa Clara Countywide Bicycle Plan’s primary goal was to make it easier and safer for people to bike when traveling from one city to the next in Santa Clara County. The plan establishes a network of Cross County Bikeway Corridors that will provide continuous, complete bike connections across the county. The plan also identifies locations where new and improved bicycle connections are needed across freeways, rail lines, and creeks. Lastly, the plan identifies ways to make it easier for people to use their bicycle with transit, including bicycle access to major transit stops, bicycle parking at stops, and bicycle accommodations on board.

2.4 Congestion Management Program Monitoring and
Conformance Report
As the county’s Congestion Management Agency (CMA), VTA is responsible for managing the county’s blueprint to reduce congestion and improve air quality. VTA is authorized to set state and federal funding priorities for transportation improvements affecting the Santa Clara County CMP transportation system.

CMP-designated transportation system components in Mountain View include a regional roadway network, a transit network, and a bicycle network. The CMP regional roadway network in Mountain View includes all state highways, county expressways, and some principal arterials, while the transit network includes rail service and selected bus service. The bicycle network focuses on the Cross County Bicycle Corridors, which is a network of 57 routes that are identified in the Santa Clara Countywide Bicycle Plan (summer 2018). The long-range countywide transportation plan and how projects compete for funding and prioritization are documented in the Valley Transportation Plan (VTP) 2040 (adopted in October 2015).

The Citywide Multimodal Improvement Plan (MIP), also referred to as the Deficiency Plan per state’s CMP legislation, is a planning document that identifies measures to improve transportation conditions on the CMP network instead of making physical traffic capacity expansions such as widening an interse ction or roadway. The MIP is based on the VTA Deficiency Plan Requirements, which describe the required content, actions, and implementation standards to assist member agencies with deficiency plan preparation and responsibilities.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
34 2.5 City of Mountain View General Plan 2030
The City of Mountain View General Plan 2030 includes mobility goals aimed to enhance travel by all modes by encouraging use by non-auto modes and thus reduce vehicle trips. The goals and policies include topics of complete streets, accessibility, walkability, bikeability, public transit, safe routes to school, vehicle parking, performance measurements, greenhouse gas emissions and air quality, and vehicles and roadway style efficiency. The goal and policies for the North Bayshore Change Area are listed below:
• Goal LUD-16: A diverse area of complementary land uses and open space resources. ◦ LUD 16.1: Protected open space. Protect and enhance open space and habitat in North Bayshore. ◦ LUD 16.2: Mix of uses. Promote the North Bayshore Area as a vibrant mix of residential, commercial, service, and entertainment uses through the North Bayshore Precise Plan. ◦ LUD 16.3: Business-class hotel. Encourage the development of a business-class hotel and conference center.
◦ LUD 16.4: Innovative corporate campuses. Encourage innovative corporate campus designs. ◦ LUD 16.5: Protected views. Protect views by including open areas between tall buildings. ◦ LUD 16.6: Open space amenities. Encourage development to include open space amenities, plazas, and parks that are accessible to the surrounding transit, bicycle, and pedestrian network. ◦ LUD 16.7: Gateway development. Support the creation of a gateway development with a diverse mix of uses near Highway 101 and North Shoreline Boulevard. • Goal LUD-17: A sustainable and efficient multi-modal transportation system. ◦ LUD 17.1: Connectivity. Improve connectivity and integrate transportation services between North Bayshore, downtown, NASA Ames, and other parts of the city. ◦ LUD 17.2: Transportation Demand Management strategies. Require development to include and implement Transportation Demand Management strategies.
◦ LUD 17.3: Bicycle and pedestrian focus. Support bicycle and pedestrian improvements and connections to and throughout North Bayshore.
◦ LUD 17.4: North Shoreline Boulevard and Rengstorff Avenue enhancements. Encourage the enhancement of North Shoreline Boulevard, Rengstorff Avenue, and other key streets in North Bayshore through new development and street design standards

2.6 AccessMV: Comprehensive Modal Plan
AccessMV is a modal plan to provide a consistent vision for the city’s multi-modal transportation network.

This plan aims to identify the city’s primary transportation network for all modes and prioritizes previously identified transportation improvement projects. The city has analyzed bicycle level of traffic stress, pedestrian quality of service, and potential transit demand.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 35

2.7 Mountain View Vision Zero Policy
On December 10, 2019, Mountain View City Council unanimously adopted a Vision Zero Policy to eliminate fatal traffic collisions in Mountain View by 2030. Vision Zero is an integrated set of policies, plans, and programs based on the philosophy that fatal collisions are unacceptable and often preventable.

Mountain View's Vision Zero approach is to eliminate fatal and severe injury traffic collisions among all road users, including those walking, biking, and driving. This approach is working to eliminate fatal traffic collisions by 2030, working to decrease traffic collisions involving fatalities or sever e injuries by 50% by 2030 from a 2016 baseline of 15 collisions; and working to decrease the three-year annual average number of people killed or severely injured (KSI) in collisions by 15% every three years from a current three-year annual average baseline of 19 people.

2.8 North Bayshore Precise Plan (NBPP)
The NBPP implements the General Plan’s goals, policies, and design directions for the North Bayshore Change Area and establishes standards, guidelines, and decision-making processes for the area’s land use and development. All applications for new construction, substantial modifications or improvements to existing buildings, and changes in land use shall be reviewed for conformance with the NBPP. The NBPP is adopted under the authority of the City’s Zoning Ordinance, which establishes precise plans as a too l to regulate land use and development where certain properties or conditions require specialized attention.

The NBPP includes the following chapters:
• Introduction
• Vision and Guiding Principles
• Land Use and Design
• Green Building and Site Design
• Habitat and Biological Resources
• Mobility
• Infrastructure
• Implementation
The Mobility chapter and section 8.3 of the Implementation chapter are described below. The Mobility chapter specifies the design of the street system, parking approach, transportation demand man agement approach, and the role of the Mountain View Transportation Management Association (TMA). As noted at the start of the Mobility chapter the key transportation policies and metrics include the following:
• Setting a district wide single occupancy vehicle mode share target of 45% • Establishing a district-wide vehicle trip cap
• Implementation of Transportation Management Association programs • Eliminating minimum parking requirements and setting parking maximums Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
36 • Development of new street typologies and design guidelines for each typology • Identification of key transportation infrastructure improvements to support SOV target and mode shift • Development of a complete bicycle network
The NBPP standards and guidelines result in the construction and management of a street system that supports travel by walking, bicycling, carpool, and transit. These mode priorities are emphasized by the first section of the Mobility chapter, Street Typologies, which defines the vehicle priority for six street types and references standards and guidelines discussed in other sections of the chapter. Specifically, the street typologies balance context and mode priority for:
• Gateway Boulevard – Shoreline Boulevard, Amphitheatre Parkway, Garcia Avenue, and Rengstorff Avenue are identified as Gateway Boulevards with vehicle traffic being a high priority. Design standards are described in Table 14 of the NBPP.
• Transit Boulevard – This is an overlay on all of Garcia Avenue and on portions of San Antonio Road, Charleston Road, and Shoreline Boulevard with frequent transit service. Design standards are described in Table 15 of the NBPP.
• Access Street – Access streets distribute vehicle traffic from Gateway Boulevards to adjacent land uses with parking access. Access streets include Terminal Way, Casey Avenue, Marine Way, Salado Drive, Landings Drive, Alta Avenue, US 101 frontage Road, Stierlin Court, Crittenden Lane, and portions of San Antonio Road, Charleston Road, Plymouth Street, and Joaquin Road. Design standards are described in Table 16 of the NBPP.
• Neighborhood Streets – These streets provide access to/from Shoreline Boulevard and are meant to circulate vehicles without providing access to park entrances or refuse pick-up since those services are provided on Access Streets. These streets provide bicycle lanes and a curbside zone for transit stops, street trees, stormwater treatment, and other active uses. Neighborhood streets include Huff Avenu e, Pear Avenue, Shorebird Way, Space Park Way, La Avenida, and portions of Joaquin Road, Charleston Road, and Plymouth Street. Design standards are described in Table 17 of the NBPP. • Service Streets – These streets are residential or service oriented and they can accommodate refuse pick-up, deliveries, emergency access, loading zones, and parking entrances. Many of these streets will be new streets. Design standards are described in Table 18 of the NBPP. • Green Way – These pathways serve pedestrians and bicyclists and incorporate high-quality crossings of streets. Greenways can accommodate emergency vehicles. Design standards are described in Table 19 of the NBPP.

The next eleven sections of the Mobility chapter provide standards and guidelines for the streets by mo
de, a list of transportation improvements, and parking requirements. A summary of each section is listed below:
• Public Frontages – This section addresses the area between the street curb and the back of the sidewalk.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 37 • Streetscape Design – This section addresses standards for street tree plantings, sidewalk continuity, sidewalk furniture, pedestrian scale lighting, and stormwater features. • Priority Transportation Improvements – This section lists and prioritizes the priority transportation improvements for the NBPP in Table 20. Several follow-up studies are identified that would refine the priority transportation improvement list.
• Bicycle Network – This section defines the bicycle facilities, presents a complete bicycle network as shown in Figure 48 of the NBPP, and provides specific design standards and guidance for each bicycle facility.
• Bike Parking and Commuter Amenities – This section provides bike parking and amenity standards and guidance.
• Pedestrian Network – This section defines the pedestrian facilities for each street typology and provides specific design standards and guidance for each pedestrian facility. • Transit Network – This section identifies the importance of public transit service, employer sponso red shuttles, advanced technologies and the Charleston bridge, Figure 48 shows the transit network and 5- to 10-minute walk sheds and provides specific design standards and guidance for transit facilities. • Shared, Unbundled, and Manage Parking – This section defines shared parking, unbundled parking, managed parking, and standards and guidelines.
• Off-Street Parking Requirements – This section describes the parking approach for commercial and residential parking, garage adaptation (a parking garage being converted to other uses over time), maximum parking requirements for office/R&D and residential land uses, and other standards and guidelines for parking.
• Carsharing – This section provides standards and guidelines for carsharing. • Parking for Carpools, Vanpools, and Electric Vehicles – This section provides standards and guidelines for carpools, vanpools, and electric vehicles.

The final two sections of the Mobility chapter discuss the transportation demand management program an
d the role of the transportation management association to reduce congestion and improve person connectivity.
• Transportation Demand Management – This section includes a description of the employer TDM approach, the use of project-level TDM plans, the residential vehicle trip performance standard, the North Bayshore trip cap (specified in Chapter 8 Section 8.3 of the NBPP and discussed further in the following section), congestion pricing, and commercial and residential TDM standards and guidelines. • Transportation Management Association – The Mountain View TMA includes companies and property owners in the North Bayshore and East Whisman area. The purpose of the TMA is to reduce congestion and improve person connectivity. This section provides a description of some of the TMA functions and standards.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
38 2.8.1 North Bayshore District Trip Cap Policy
The 2017 NBPP established a North Bayshore District Trip Cap Policy (Chapter 6 Section 6.14 and Chapter 8 Section 8.3). The North Bayshore District Trip Cap Policy is expressed as an absolute number of ve hicle standard (Chapter 8 Section 8.3, page 244) in the District Vehicle Trip Cap and Monitoring Program Section 8.3 of the NBPP:
• North Bayshore Gateway Peak Hour Vehicle Trip Cap. The District Vehicle Trip Cap is established as the maximum allowed number of trips at the three North Bayshore gateways during the following peak hour periods: 8,290 trips (AM) and 8,030 (PM).

The North Bayshore District Trip Cap Policy quantifies the physical vehicle capacity of the three main gateways (San Antonio Road, Rengstorff Avenue, and Shoreline Boulevard) and represents the number of vehicles that can be served during the peak morning and evening periods, while maintaining reasonable freedom of vehicular movement (i.e., avoiding gridlock conditions on the local streets, at the gateway interchanges, and on the freeway system). The implementation of the District Vehicle Trip Cap Policy at the three gateways is defined as follows:
• Vehicle Trip Cap Monitoring. The City shall monitor the number of vehicle trips at each of the three major entry points to North Bayshore: San Antonio Road; Rengstorff Avenue; and Shoreline Boulevard.

Monitoring shall occur at least twice a year during periods determined by the City. • District Vehicle Trip Cap. If monitoring shows that the trip cap is reached at any of the three gateway locations after two consecutive data reporting periods, the City will not grant any new building permits for net new square footage in the North Bayshore Precise Plan area until the number of peak hour vehicle trips is reduced below the trip cap, except as described in the next paragraph.

An application for new development may propose strategies, including but not limited to, physical improvements to the transportation network and additional Transportation Demand Management measures, along with traffic analysis demonstrating the proposed strategies and/or improvements will comply with the district vehicle trip cap prior to project occupancy. Proposed strategies and/or improvements shall be implemented prior to building occupancy, unless deemed otherwise by the City Council. The City Council will consider applications proposing improvements to the transportation network and/or additional Transportation Demand Management measures according to the review process established by City Council policy.

The adopted North Bayshore District Trip Cap Policy is a target trip generation for the North Bayshore District, and can be defined in different ways. In this case, the adopted North Bayshore District Trip Cap Policy is based on the individual gateway capacity estimates from a traffic operations analysis (Fehr & Peers, North Bayshore Precise Plan EIR - Vehicle Gateway Capacity with Residential, December 2016) included in the Final Subsequent Environmental Impact Report for the North Bayshore Precise Plan that was certified in November 2017. The 2017 NBPP adds nearly 10,000 residential dwelling units, which has the effect of creating a more balanced directional traffic flow, increasing the amount of outbound traffic in the morning and inbound traffic in the evening.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 39

2.8.2 Site-Specific TDM Plan Policy
Separate from the North Bayshore District Trip Cap Policy, the NBPP also includes a Site-Specific TDM Plan Policy that is referenced in sections 6.14 and 8.3 of the NBPP and a precise definition is presented in the North Bayshore Transportation Demand Management (TDM) Plan Guidelines. The Site -Specific TDM Plan Policy applies a 45% morning peak hour inbound single-occupancy vehicle mode share at each development’s driveways (or at a District parking structure with specified vehicle trip targets) for future employees (and associated visitors) commuting to North Bayshore. This requirement has been superseded by the North Bayshore Circulation Study and the specific project TDM proposals.

2.9 North Bayshore Circulation Study
In December 2018, the North Bayshore Circulation Study (Circulation Study) was initiated to carry out several of the short-term implementation actions identified in the NBPP, including feasibility studies of potential gateway improvements (i.e., a new transit bridge over Stevens Creek and a Charleston Road connection under US 101) as well as strategies that might be needed to reduce morning peak hour inbound single-occupancy vehicle (SOV) mode share at the driveways for non-residential development and update the transportation demand management requirements in the North Bayshore Transportation Demand Management (TDM) Plan Guidelines (2015) for non-residential development and the North Bayshore Residential Transportation Demand Management Guidelines (2018) for residential development.

An initial phase of the Circulation Study focused on the feasibility analysis of the Charleston Road connection and the Stevens Creek bridge. These projects were identified in the Precise Plan as potential improvements to add vehicle gateway capacity and help achieve the site-specific TDM Plan Policy SOV mode share at the driveways for non-residential development. The Circulation Study analysis determined that the Charleston Road connection under US 101 was not feasible and developed an alternative modification to the Rengstorff Avenue interchange. Council reviewed the study analysis on May 12, 2020, and supported the alternative Rengstorff project (Rengstorff Connector that includes modifications to the northbound US 101 off-ramps and on-ramps and a local street connection between Landings Drive and Rengstorff Avenue). However, the City Council did not support a transit bridge over Stevens Creek. The list of Priority Transportation Improvements was revised to reflect these decisions.

The second phase of the study focused on gateway trip compliance with completion of the NBPP. The evaluation resulted in a combination of new transportation infrastructure (Priority Transportation Improvements), a 35% to 40% SOV for existing and future non-residential development travel, and a modified North Bayshore Trip Cap Policy definition. The Circulation Study made the following recommendations:

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
40 1. Modify gateway trip cap policies to revise the time period and locations for compliance and update gateway capacity estimates as follows:
a. Continue the twice-yearly gateway monitoring program in order to track post-COVID traffic and compliance trends. The monitoring should measure peak-period trips in both directions at each gateway, as well as mode share trends.
b. Expand the monitoring as new growth occurs to better understand characteristics of peak traffic, use of non-SOV modes, and trip characteristics of new residents. c. Measure compliance by comparing actual trips with the gateway capacity for the three -hour peak period, as opposed to just the peak hour.
d. Measure compliance by combining the Shoreline and Rengstorff gateways. The San Antonio gateway should continue to be measured separately.
e. Adjust the Shoreline and Rengstorff gateway capacities as the new infrastructure projects are completed [The numeric policy targets range from 16,350 to 20,730 inbound morning peak period vehicles, and 15,330 to 18,300 outbound evening peak period vehicles].

2. Develop new financial-based penalties for noncompliance with individual project vehicle trip caps and/or the gateway trip cap.

3. Establish a lower SOV rate in the range of 35% to 40% for both existing and future employees on any new development. The transportation analysis of individual developments should determine any strategies, in addition to the lower SOV rate, that are needed to help achieve compliance with the trip cap.

4. In the near term, complete the design and construction of the Priority Transportation Projects already in process as quickly as possible. For the major Priority Transportation Improvemen ts not yet started, advance the planning and initial design phases through the Capital Improvement Program (CIP) to prepare them to move into construction when needed.

5. Proceed with the next planning phase for the Rengstorff Connector project, including th e Caltrans Project Approval and Environmental Documentation (PAED) process for the Rengstorff Avenue interchange component (recently funded through the VTA Measure B program). Planning work will take approximately two years, during which time the City can review post-COVID conditions and better understand the project requirements and costs prior to making a final decision to proceed with design and construction of this project.

6. Plan and advocate for expanded public transit service so that North Bayshore is designated as a transit-rich area, and work with VTA and the MTMA on strategies for service expansion.

7. Defer a decision on a congestion pricing program while monitoring other Bay Area tolling activities, gathering information about potential impacts, and establishing traffic thresholds or other factors that could support future implementation.

8. Update the NBPP to reflect approved Circulation Study recommendations, including:
▪ Priority Transportation Improvements
▪ Gateway Trip Cap policies
▪ Bicycle and pedestrian policies and plans
▪ Implementation policies including issuance of building permits and financial penalties for TDM noncompliance
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 41 ▪ TDM requirements for development
▪ Revise language regarding trip caps and compliance to retain the broad policies and remove specifics of monitoring and operations

9. Update the Circulation Study in three to five years to review transportation strategies and confirm specific gateway trip cap policies.

These updated North Bayshore Circulation Study policies were approved by the City Council in December, 2021. An amendment to the Precise Plan is planned to incorporate these updated policies.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
42 3. Existing Conditions
This chapter describes the Existing Conditions of the roadway system, pedestrian and bicycle facilities, and transit service near the NBS Master Plan area. It also presents existing traffic volumes and operations for the study intersections and freeway segments.

COVID-19 Note: The following Existing Conditions discussion describes conditions prior to the formal shelter-in-place order issued by Santa Clara County Public Health Department on March 16, 2020 , to slow the spread of COVID-19.

3.1 Existing Street System
US 101 and SR 85 provide regional access to the study area. The following streets provide loc al access and are considered the North Bayshore gateways: Shoreline Boulevard, La Avenida, Rengstorff Avenue, San Antonio Road, and Bayshore Parkway.

US 101 is a primarily north-south highway located south-west of the project site with six travel lanes in both the northbound and southbound direction. In each direction, two travel lanes are designated as high-occupancy vehicle (HOV) lanes. HOV lanes are limited to use by vehicles occupied by two or more persons between 5:00 AM and 9:00 AM as well as between 3:00 PM and 7:00 PM. US 101 extends north through San Francisco and south through San Jose to Gilroy. Access streets to the project site from US 101 are Shoreline Boulevard, San Antonio Road, and Rengstorff Avenue.

SR 85 is a north-south highway extending between the US 101 interchange in the city of San Jose to the south and the US 101 interchange in Mountain View to the north. The highway has two mixed-flow lanes plus one HOV lane per direction along its entirety. Access to the project site from SR 85 is via its interchanges with US 101.

Amphitheatre Parkway is a three-lane, east-west gateway boulevard that extends east from North Shoreline Boulevard/Stierlin Court in the east to Charleston Road/Garcia Avenue/Rengstorff Avenue in the west. Two lanes are continuously provided in the westbound direction; only one lane is provided eastbound east of the Permanente Creek Bridge. Amphitheatre Parkway provides access to office developments and parks. The posted speed limit is 35 miles per hour. Sidewalks and bike lanes are provided on both sides of Amphitheatre Parkway.

Shoreline Boulevard is a four- to six-lane, north-south gateway boulevard with a raised median that extends from El Camino Real in the south to Shoreline at Mountain View Regional Park in the north.

Shoreline Boulevard is classified by the 2030 General Plan as major retail street from US 101 to Charleston Road, from Charleston Road to Crittenden Lane, and Park Street from Crittenden Lane to Shoreline at Mountain view Regional Park. Within the project site, North Shoreline Boulevard provides access to US 101 as well as office and commercial developments. The posted speed limit is 35 mph.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 43 San Antonio Road is a two- to six-lane, north-south gateway boulevard that extends from Foothill Expressway (within Los Altos) to Terminal Boulevard near Shoreline at Mountain View Regional Park. San Antonio Road provides access to US 101 as well as office and commercial developments within the project site. The posted speed limit is 35 mph.

Rengstorff Avenue is a four-lane, north-south gateway boulevard that extends from El Camino Real in the south to Charleston Road/Garcia Avenue in the north where it becomes Amphitheatre Parkway. Rengstorff avenue provides access to US 101 from the project site. The posted speed limit is 35 mph.

Charleston Road is a four-lane, east-west access street that extends from Amphitheatre Parkway in the west to Stevens Creek Trail in the east. Charleston Road is not a through street east of Charleston Road/Shorebird Way. This street provides local access to office and commercial developments. Charleston Road becomes Garcia Avenue west of Garcia Avenue/Amphitheatre Parkway providing local access to office, residential, and commercial developments. The posted speed limit on Charleston Road is 35 miles per hour.

Landings Drive is a two-lane, access street that connects on both ends to Charleston Road. The posted speed limit is 25 miles per hour. Landings Drive provides access to office developments.

Bayshore Parkway is a two-lane, north-south access street that runs parallel to US 101 from San Antonio Road to Salado Drive. Bayshore Parkway provides access to office developments within the project site.

The posted speed limit is 25 mph.

Alta Avenue is a two-lane, north-south access street that connects Plymouth Street to Charleston Avenue.

Alta Avenue provides access to office developments. The posted speed limit is 25 miles per hour. There are sidewalks on both sides of Alta Avenue.

Huff Avenue is a two-lane, north-south neighborhood street that connects Plymouth Street to Charleston Road. Huff Avenue provides access to office and commercial developments. The posted speed limit is 25 miles per hour. There are sidewalks on both sides of Huff Avenue.

Joaquin Road is a two-lane, north-south neighborhood street that connects Plymouth Street to Charleston Road. Joaquin Road provides access to office developments. The posted speed limit is 25 miles per hour.

There are meandering sidewalks on both sides of Joaquin Road.

Pear Avenue is a two-lane, east-west neighborhood street that extends from Shoreline Boulevard to El Centro Avenue. Pear Avenue provides access to office and commercial developments. The posted speed limit is 25 miles per hour. There are sidewalks on both sides of Pear Avenue.

Shorebird Way is a two-lane, primarily east-west neighborhood street that connects North Bayshore Boulevard to Charleston Road. Shorebird Way provides access to office developments. The posted speed limit is 25 miles per hour.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
44 Plymouth Street is a two-lane, east-west neighborhood street that connects North Shoreline Boulevard to Alta Avenue. Plymouth Street provides access to office developments. The posted speed limit is 25 miles per hour.

Space Park Way is a two-lane, east-west neighborhood street that extends from Shoreline Boulevard to Armand Drive. Space Park Way provides access to office and commercial developments. The posted speed limit is 25 miles per hour.

La Avenida is a two- to three-lane east-west neighborhood street that extends from North Bayshore Boulevard to Stevens Creek Trail. La Avenida is a one-way westbound street from North Bayshore Boulevard to Inigo Way and a two-way street from Inigo Way to Stevens Creek Trail. La Avenida provides access to office developments. The posted speed limit is 25 mph.

3.2 Existing Truck Routes
The City of Mountain View Municipal Code section 19.60 designates truck routes within the city limits. The designated truck routes within the study area are Charleston Road, San Antonio Road, US 101, and SR 85.

3.3 Existing Pedestrian Facilities
Pedestrian facilities include sidewalks, curb ramps, crosswalks, and off-street paths that are meant to provide safe and convenient routes for pedestrians to access destinations such as institutions, businesses, public transportation, and recreation facilities. Figure 7 shows the existing sidewalk gaps in the NBPP area. Most streets in North Bayshore include at least a four-foot-wide sidewalk on one or both sides except for Crittenden Lane, Stierlin Court, a segment of Shorebird Way, Macon Avenue, a segment of Pear Avenue, a segment of Landings Drive, a segment of Bayshore Parkway, a segment of Alta Avenue, San Antonio Road, and a segment of Garcia Avenue. Within the project site, meandering sidewalks buffered from the roadway by landscaping exist along Amphitheatre Parkway, North Shoreline Boulevard, and Charleston Road.

Most intersections in the project site have crosswalks with pedestrian signals. The intersection of North Shoreline Boulevard and Space Park Way has no midblock crosswalk across North Shoreline Boulevard.

There is a pedestrian bridge across US 101 via the Permanente Creek Trail, which terminates at West Middlefield Road.

3.4 Existing Bicycle Network
The four classes of bicycle facilities in Mountain View are described in the Mountain View Bicycle Transportation Plan Update (2015). These descriptions are based on California Department of Transportation (Caltrans) classifications of bikeways from California Assembly Bill 1193 and the Highway Design Manual (Chapter 1000: Bikeway Planning and Design). Each bikeway class is intended to provide bicyclists with enhanced riding conditions. Bikeways offer various levels of separation from traffic based Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 45 on traffic volume and speed, among other factors. The four bikeway types and appropriate contexts for each are presented below.

Class I Bikeway (Shared-Use Path) Shared-use paths, sometimes referred to as multi-use paths, provide a completely separate right-of-way and are designated for the exclusive use of people riding bicycles and walking with minimal roadway crossings. In general, bike paths are along corridors not served by st reets or where sufficient right-of-way exists to allow them to be constructed away from the influence of vehicles. Mountain View has many such paths located along creeks and the light rail line. Class I Bikeways can also offer opportunities not provided by the road system by serving recreational areas and/or desirable commuter routes.

Class II Bikeways (On-Street Bike Lanes) Bike lanes provide a striped lane, pavement markings, and signage for one-way bike travel on a street or highway. Bicycle lanes are typically five (5) feet wide, although wider lanes are desirable on roadways with high traffic volumes and/or high travel speeds. The VTA Bicycle Technical Guidelines (December 2007) recommends that Caltrans standards regarding bicycle lane dimensions be used as a minimum and provides supplemental information and guidance on when and how to better accommodate the many types of bicyclists.

Bike lanes may be enhanced with painted
buffers between vehicle lanes and/or parking, and green paint at conflict zones (such as driveways or intersections).

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
46 Class IIIa Bikeways (Bike Routes) Bike routes maybe identified on a local residential or collector street when the travel lane is wide enough, and the traffic volume is low enough, to allow both cyclists and motor vehicles to share a lane and/or to provide continuity to a bikeway network. Shared -use arrows or “sharrows” are common striping treatments for bike routes.

Class IIIb Bikeways (Bike Boulevards) Bicycle boulevards provide further enhancements to bike routes to encourage slow speeds and discourage non-local vehicle traffic via traffic diverters, chicanes, traffic circles, and/or speed tables. Bicycle boulevards can also feature special wayfinding signage to nearby destinations or other bikeways.

Class IV Bikeways (Separated Bikeway) Separated bikeways, also referred to as cycle tracks or protected bikeways, are bikeways for the exclusive use of bicycles which are physically separated from vehicle traffic.

Separated bikeways were adopted by Caltrans in 2015. Types of separation may include, but are not limited to, grade separation, flexible posts, physical barriers, or on-street parking.

Under California law, bicyclists are allowed to use all roadways in California unless posted otherwise.

Therefore, even for roadways that have no designated (or planned) bikeway identified, a majority are open for cycling.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 47 The location of the existing bicycle facilities is shown on Figure 8. Existing Class I Shared Use Paths in Mountain View include the Stevens Creek Trail, Hetch Hetchy Trail, Permanente Creek Trail, existing lig ht rail trails, and a portion of the Bay Trail through Shoreline at Mountain View Regional Park, all of which have asphalt or concrete surfaces. As described above, Class I bikeways are off-street multi-use (pedestrian and bicycle) paths that are separated from roadways to create a safer, convenient, and more connected walking and biking environment. Stevens Creek Trail and Permanente Creek Trail are two north-south Class I bikeways that run through the project site and connect to the Bay Trail, an east-west Class I bikeway north of the project site.

Within the project site, Class II Bike lanes exist along Shoreline Boulevard, La Avenida, Inigo Way, Charleston Road/Garcia Avenue, Crittenden Lane, Amphitheatre Parkway, Bayshore Parkway, and Rengstorff Avenue. Class IIIa Bike routes exist along the segment of Shoreline Boulevard north of Charleston Road.

3.5 Existing Transit Service
North Bayshore is served by both public transit and private shuttle services. Prior to the COVID -19 shelter- in-place policy, public transit routes that served the North Bayshore area included Santa Clara Valley Transportation Authority (VTA) Route 40, Express Route 185, and Orange Line, as well as two MVgo routes: MVgo West Bayshore and MVgo East Bayshore. Private shuttle services are operated by Google, Microsoft,12 and Intuit.

Figure 9 displays the pre-COVID public transit routes in and near the North Bayshore District, and Table 6 shows the span of service and frequency of the public transit routes that serve North Bayshore.

12 Microsoft shuttle is furloughed due to the construction of the new building.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
48 Table 6: Pre-COVID 2020 Transit Service
Route From To
Weekdays Weekends
Operating
Hours
Headway
(minutes) Operating
Hours
Headway
(minutes)
Peak Midday
Express Shuttle
185 Gilroy Transit
Center
Mountain
View
6:00 to 9:45 AM (N)
4:15 to7:45 PM (S) 10 No
Service No Weekend Service
Bus
40 Foothill
College
Mountain
View Transit
Center
6:30 AM to 10:30 PM (N)
6:13 AM to 10:05 PM (S) 10 30 8:15 AM to
7:00 PM 10
Transit Lines
Orange
Line
Mountain View
Station
Alum Rock
Station
5:00 AM to 12:50 PM (E)
4:42 AM to 1:15 AM (W) 5 10 5:50 AM to
1:00 AM 5
MVgo
West
Bayshore
Downtown
Mountain View
Transit Center
Casey
Avenue/
Intuit Main
Street
6:45 AM to 10:45 AM &
3:00 to 8:45 PM 15 N/A No Weekend Service
MVgo East
Bayshore
Downtown
Mountain View
Transit Center
Crittenden
Lane
7:14 AM to 10:18 AM
4:01 PM to 8:17 PM 20 N/A No Weekend Service
Note: Routes reflect VTA New Service launched on December 28, 2019.

Source: VTA, ACE and MVgo 2020.

Through the COVID-19 pandemic, several changes have been made to the transit service in North Bayshore. Express route 185 was canceled due to low ridership and a new MVgo route has been added to the North Bayshore area. Public transit routes now include Santa Clara Valley Transportation Authority (VTA) Route 40, and Orange Line, as well as three MVgo routes: MVgo B, MVgo C, and MVgo D.

Figure 10 displays the existing public and private transit routes in and near the North Bayshore District, and Table 7 shows the span of service and frequency of the public transit routes that serve North Bayshore.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 49 Table 7: Existing 2022 Transit Service
Route From To
Weekdays Weekends
Operating
Hours
Headway1
(minutes) Operating
Hours
Headway
(minutes)
Peak Midday
Bus
40 Foothill College Mountain View
Transit Center
6:25 AM to 10:30 PM (N)
6:14 AM to 10:00 PM (S) 30 30 8:15 AM to
6:30 PM 50
Transit Lines
Orange
Line
Mountain View
Station
Great America ACE
Station
3:00 PM to 6:40 PM (E)
6:00 AM to 10:00 AM (W) 60 N/A N/A N/A
MVgo
(B) Downtown
Mountain View
Transit Center
Shoreline, La
Avenida, Crittenden
6:30 AM to 10:00 AM
3:25 PM to 8:05 PM 15 N/A No Weekend Service
(C) Downtown
Mountain View
Transit Center
Charleston, Garcia,
and San Antonio
(counterclockwise
loop)
6:35 AM to 10:35 AM
3:00 PM to 8:00 PM 15 N/A No Weekend Service
(D) Downtown
Mountain View
Transit Center
San Antonio, Garcia,
and Charleston
(clockwise loop)
6:40 AM to 10:45 AM
2:50 PM to 8:00 PM 15 N/A No Weekend Service
Notes:

1. Headways are defined as the time between transit vehicles on the same route.

Source: VTA, ACE and MVgo, 2022.

Exhibit 10
North Bayshore Precise Plan Boundary
City of Mountain View
Shoreline at
Mountain View Regional Park
Permanente Creek
Stevens Creek
k e e r C e t n e n a m r e P
SJ21_2114
Existing Transit Service
Figure 4

0.5 Miles
Bayshore Rd
Rengstorff Ave
Old Middlefield Way
San Antonio Rd
Garcia Ave
Amphitheatre Pkwy
Rengstorff Ave
Middlefield Rd
Shoreline Blvd
Charleston Rd
Shoreline Blvd
Cri�enden Ln
S�erlin Ct
Space Park Wy
Pear Ave
La Avenida
Terra Bella Ave
Joaquin Rd
Huff AveAlta Ave
Leghorn St
Bayshore Pkwy
Plymouth St
Broderick Wy
Salado Dr
Coast Ave
Terminal Blvd
Casey Ave
Landings Dr
Charleston Rd
Macon Ave
Inigo Wy
Shore Bird Wy
Charleston Rd
£¤101
£¤101
|}85
Marine Wy
North Bayshore Master Plan Boundary
North Bayshore Precise Plan Boundary
City of Mountain View
No Sidewalk
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig07_Sidewalk_Gaps.ai Sidewalk Gaps
Figure 7
Exhibit 10
North Bayshore Precise Plan Boundary
City of Mountain View
Shoreline at
Mountain View Regional Park
Permanente Creek
Stevens Creek
k e e r C e t n e n a m r e P
SJ21_2114
Existing Transit Service
Figure 4

0.5 Miles
33JJ
33JJ
33JJ
33JJ
33JJ
33JJ
33JJ
33JJ
Bayshore Rd
Rengstorff Ave
Old Middlefield Way
San Antonio Rd
Garcia Ave
Amphitheatre Pkwy
Rengstorff Ave
Middlefield Rd
Shoreline Blvd
Charleston Rd
Shoreline Blvd
Cri�enden Ln
S�erlin Ct
Space Park Wy
Pear Ave
La Avenida
Terra Bella Ave
Joaquin Rd
Huff AveAlta Ave
Leghorn St
Bayshore Pkwy
Plymouth St
Broderick Wy
Salado Dr
Coast Ave
Terminal Blvd
Casey Ave
Landings Dr
Charleston Rd
Macon Ave
Inigo Wy
Shore Bird Wy
Charleston Rd
£¤101
£¤101
|}85
Marine Wy
33JJ
Bicycle Lane (Class II)
Bicycle Path (Class I)
Bicycle/Pedestrian Crossing
Buffered Bicycle Lane (Class IIB)
Bicycle Route (Class IIIa)
Bicycle Boulevard (Class IIIb)
Bicycle Cycle Track/Separated Bikeway
San Francisco Bay Trail
Barrier to Bicycle/Pedestrian Travel
Miles

0.5 North Bayshore Master Plan Boundary
North Bayshore Precise Plan Boundary
City of Mountain View
W:\San Jose N Drive\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig08_Bicycle_Facilities.ai Bicycle Facilities
Figure 8
Exhibit 10
North Bayshore Precise Plan Boundary
City of Mountain View
Shoreline at
Mountain View Regional Park
Permanente Creek
Stevens Creek
k e e r C e t n e n a m r e P
SJ21_2114
Existing Transit Service
Figure 4

0.5 Miles
!40
!40
!40
!40
&185
&185
&185
Bayshore Rd
Rengstorff Ave
Old Middlefield Way
San Antonio Rd
Garcia Ave
Rengstorff Ave
Middlefield Rd
Shoreline Blvd
Charleston Rd
Shoreline Blvd
Cri�enden Ln
S�erlin Ct
Space Park Wy
Pear Ave
La Avenida
Terra Bella Ave
Joaquin Rd
Huff AveAlta Ave
Leghorn St
Bayshore Pkwy
Plymouth St
Broderick Wy
Salado Dr
Marine WyCoast Ave
Terminal Blvd
Casey Ave
Landings Dr
Charleston Rd
Macon Ave
Inigo Wy
Shore Bird Wy
Charleston Rd
£¤101
£¤101
|}85
Amphitheatre Pkwy
North Bayshore Master Plan Boundary
North Bayshore Precise Plan Boundary
City of Mountain View
Orange Shuttle
Bus Stops
Local Bus Express BusXX
MVGO Route B
MVGO Route C
MVGO Route D
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig09_Existing_Transit_Service.ai Existing (Pre-COVID) Transit Service
Figure 9
Exhibit 10
North Bayshore Precise Plan Boundary
City of Mountain View
Shoreline at
Mountain View Regional Park
Permanente Creek
Stevens Creek
k e e r C e t n e n a m r e P
Existing Transit Service
Figure 4

0.5 Miles
!40
!40
Bayshore Rd
Rengstorff Ave
Old Middlefield Way
San Antonio Rd
Garcia Ave
Amphitheatre Pkwy
Rengstorff Ave
Middlefield Rd
Shoreline Blvd
Charleston Rd
Shoreline Blvd
Cri�enden Ln
S�erlin Ct
Space Park Wy
Pear Ave
La Avenida
Terra Bella Ave
Joaquin Rd
Huff AveAlta Ave
Leghorn St
Bayshore Pkwy
Plymouth St
Broderick Wy
Salado Dr
Marine Wy
Coast Ave
Terminal Blvd
Casey Ave
Landings Dr
Charleston Rd
Macon Ave
Inigo Wy
Shore Bird Wy
Charleston Rd
£¤101
£¤101
|}85
MVGO Route B
MVGO Route C
MVGO Route D
ACE Orange Shuttle
North Bayshore Master Plan Boundary
North Bayshore Precise Plan Boundary
City of Mountain View
Local BusX
£¤101
·|}ÿ85
Adobe Creek
Stevens Creek
W:\San Jose N Drive\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig10_Existing_2022_Transit_Service.ai

0.5 Miles
Existing 2022 Transit Services
Figure 10
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
54 3.6 Existing Intersection Volume Approach
Typically, new traffic counts are collected at all study intersections for traffic analyses to evaluate a recent existing condition. However, since the Existing Condition for this analysis describes conditions prior to the March 2020 shelter-in-place policy, the turning movement counts collected in May 2019 (obtained from the Landings Office Development and Huff Avenue Parking Structure Site Specific Transportation Analysis (SSTA), May 2020) were used as the existing turning movement counts for Scenario 1. The count data also includes pedestrian and bicycle counts for each intersection (refer to Appendix A). Figure 11 shows the peak hour intersection traffic volumes, lane configuration, and control type for the study intersections.

As shown in the Spring 2022 North Bayshore District Monitoring and Preliminary Hybrid Work Assessment (Fehr & Peers, June 2022) report, work commute traffic is only about 50 percent of the Spring 2020 volumes during the morning and evening peak periods. This lower vehicle traffic is because most employees at North Bayshore area businesses continue to work from home.

3.7 Existing Intersection Operations
Existing intersection lane configurations, signal timings, and peak hour turning movement volumes were used to calculate the levels of service (LOS) at the study intersections for the highest peak hour during the AM (7:00 to 10:00) and the PM (4:00 to 7:00) peak commute hours (refer to Figure 11). Table 8 shows the existing intersection level of service at each study location. Appendix B contains the corresponding calculation sheets.

The results of the LOS calculations indicate that all of the study intersections are operating at levels of service that meet the applicable LOS standards under Existing Conditions except for the following. • Int. 3: Rengstorff Ave-Amphitheatre Pkwy / Garcia Ave-Charleston Rd (LOS F during the PM peak hour)
• Int. 5: Rengstorff Ave / US 101 Southbound Ramps (LOS E during the AM peak hour) • Int. 11: Shoreline Blvd / Charleston Rd (LOS F during the PM peak hour) • Int. 15: Shoreline Blvd / Space Park Wy (LOS F during the AM peak hour) • Int. 17: Shoreline Blvd / Pear Ave (LOS E during the PM peak hour) • Int. 18: Shoreline Blvd / La Avenida - US 101 Northbound Ramps (LOS F during AM peak hour and LOS E during the PM peak hours)
By comparison, the NBPP TIA also concludes that the intersections above do not meet the LOS standards under Existing Conditions. This analysis identified a worse LOS than the NBPP at the following locations:
• Locations with higher Existing volumes in this MTA than the NBPP TIA. ◦ Int. 2: San Antonio Rd / US 101 Northbound Ramps – PM peak hour (10% higher in MTA) ◦ Int. 6: Rengstorff Ave / Leghorn St – AM peak hour (15% higher in MTA) Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 55 • Locations evaluated in TRAFFIX in NBPP, but Synchro 11 in MTA: The TRAFFIX and Synchro 11 software involve different levels of precision in user-adjustment to simulate real-world conditions.

Additionally, TRAFFIX analysis requires VTA standard inputs for base signal timing settings. Thus, LOS results between the two software should not be directly compared. ◦ Int. 7: Landings Dr / Charleston Rd (AM and PM peak hours) ◦ Int. 8: Alta Ave / Charleston Rd (AM peak hour)
◦ Int. 9: Huff Ave / Charleston Rd (AM and PM peak hours) ◦ Int. 11: Shoreline Blvd / Charleston Rd (AM and PM peak hours) ◦ Int. 15: Shoreline Blvd / Space Park Wy (AM peak hour) • Locations in which NBPP TIA included geometry that does not reflect current conditions. ◦ Int. 17: Shoreline Blvd / Pear Ave (AM peak hour) (non-current geometry on northbound and eastbound approaches)
• In addition, because of the signalization of the Shoreline Boulevard and Plymouth Road intersection (study intersection #16), the NBPP TIA calculations result in a LOS of F with a side-street stop control while this analysis with signalization shows an LOS B result.

Table 8: Existing Intersection Levels of Service
Intersection Count
Date
LOS
Threshold2 Control1 Peak
Hour3 Delay4 LOS5
1 San Antonio Rd / Bayshore Pkwy7 May
2019 D Signalized AM
PM

14.6 32.5
B
C
2 San Antonio Rd /
US 101 Northbound Ramps7
May
2019 D Signalized AM
PM

19.3 10.9
B
B
3 Rengstorff Ave-Amphitheatre Pkwy /
Garcia Ave-Charleston Rd
May
2019 D Signalized AM
PM

36.0 82.3
D
F
4 Rengstorff Ave /
US 101 Northbound Ramps7
May
2019 D Signalized AM
PM

2.6 5.8
A
A
5 Rengstorff Ave /
US 101 Southbound Ramps7
May
2019 D Signalized AM
PM

68.1 50.6
E
D
6 Rengstorff Ave / Leghorn St May
2019 D Signalized AM
PM

38.5 27.8
D
C
7 Landings Dr / Charleston Rd May
2019 D Signalized AM
PM

33.8 40.8
C
D
8 Alta Ave / Charleston Rd May
2019 D Signalized AM
PM

23.3 26.5
C
C
9 Huff Ave / Charleston Rd May
2019 D Signalized AM
PM

25.8 40.2
C
D
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
56 Table 8: Existing Intersection Levels of Service
Intersection Count
Date
LOS
Threshold2 Control1 Peak
Hour3 Delay4 LOS5
10 Joaquin Rd / Charleston Rd May
2019 D Side-Street
Stop Controlled
AM
PM

11.8 13.3
B
B
11 Shoreline Blvd / Charleston Rd May
2019 D Signalized AM
PM

50.5 105.7
D
F
12 Alta Ave / Plymouth St6,7 May
2019 D All-Way Stop
Controlled
AM
PM

7.5 8.4
A
A
13 Huff Ave / Plymouth St6,7 May
2019 D Side-Street
Stop Controlled
AM
PM

11.0 12.2
B
B
14 Joaquin Rd / Plymouth St6,7 May
2019 D Side-Street
Stop Controlled
AM
PM

15.0 20.1
B
C
15 Shoreline Blvd / Space Park Wy May
2019 D Side-Street
Stop Controlled
AM
PM

88.6 23.2
F
C
16 Shoreline Blvd / Plymouth St7 May
2019 D Signalized AM
PM

15.6 18.1
B
B
17 Shoreline Blvd / Pear Ave May
2019 D Signalized AM
PM

57.8 33.3
E
C
18 Shoreline Blvd /
La Avenida-US 101 NB Ramps7
May
2019 D Signalized AM
PM
102.2

60.5 F
E
19 Shoreline Blvd /
US 101 Southbound Ramps7
May
2019 D Signalized AM
PM

16.5 13.1
B
B
20 La Avenida /
US 101 Northbound Ramps Future Intersection
21 Inigo Wy / La Avenida 2015 D Side-Street
Stop Controlled
AM
PM

10.9 13.2
B
B
Notes: Bold text indicates intersection operates at a deficient Level of Service compared to the applicable standard.

1. Signal refers to a signalized intersection. SSSC = Side-Street Stop Controlled intersection.

2. City of Mountain View 2030 General Plan and Greenhouse Gas Reduction Program EIR, page 121 (2011).

3. AM = morning peak hour, PM = evening peak hour.

4. Whole intersection weighted average control delay expressed in seconds per vehicle calculated using methods described in the Highway Capacity Manual, 6th Edition. For side-street stop-controlled intersections, total delay for the worst movement approach is reported.

5. LOS = Level of Service. Unless otherwise noted, the LOS calculations conducted using the Synchro level of service analysis software package, which applies the method described in the Highway Capacity Manual, 6th Edition.

6. LOS calculation conducted using TRAFFIX software.

7. Denotes intersections in which lane configuration or signal phasing preclude application of HCM 6th Edition methodology. For these intersections, 2000 Highway Capacity Manual methodology is utilized for delay and LOS calculations. Delay calculations for intersections analyzed in the TRAFFIX software also utilize 2000 Highway Capacity Manual methodology, as this software does not support HCM 6th Edition methodology. *Int. 5 uses HCM 6 th Edition in Cumulative with Project scenario only.

Source: Fehr & Peers, 2023.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 57

3.8 Field Observations
Field visits were conducted in 2020, prior to COVID-19, to confirm the operations analysis results and to observe overall transportation system characteristics. In general, observations indicated that most of the study intersections are operating at or near the calculated levels of service. For the AM peak directions of travel, an extensive queue was observed on Shoreline Boulevard northbound between Pear Avenue and Middlefield Road. Because of the high northbound vehicle volume along Shoreline Boulevard , combined with pedestrians and vehicles crossing Shoreline Boulevard at Pear Avenue, this intersection acts as a bottleneck that meters traffic into the North Bayshore area.

In the evening peak hour, the queue of southbound vehicles on Shoreline Boulevard extends from the US 101 Southbound ramps to Plymouth Street. This queuing is primarily due to a lane utilization imbalance caused by traffic heading toward US 101 northbound and the US 101 and SR 85 southbound on- ramps.

The Rengstorff Avenue gateway is an alternative to the Shoreline Boulevard gateway, with less congestion and shorter queues than along Shoreline Boulevard. However, for those commuters traveling to or from the south, most prefer to use the Shoreline Boulevard gateway to minimize the time spent on the heavily congested freeway. The San Antonio Road gateway is more lightly used and does not experience elevated levels of congestion or queuing during either the morning or evening peak hours.

Bicycle use is widespread throughout the North Bayshore area and along the roadways and shared -use paths leading to the area. There was a high number of observed bicyclists at Amphitheatre Parkway/ Garcia Avenue-Charleston Road. The highest number of cyclists using Shoreline Boulevard was during the AM peak hour. Google operates a bike share program in the North Bayshore area, which allows employees to bicycle between Google buildings within the plan area.

As noted earlier, Spring 2022 volumes are about 50% of the Spring 2020 volumes. In the Spring of 2022, short vehicle queues were observed and all vehicle traffic is served in one intersection signal cycle except for the US 101 northbound off ramp at Shoreline Boulevard. Standing queues (which occur when vehicle traffic requires more than one intersection signal cycle to be served) were not observed. Unlike during congested conditions of previous monitoring reports, the observed vehicle volume is well below the gateway capacity and arriving vehicles are served in one signal cycle.

As shown in the Spring 2022 North Bayshore District Monitoring and Preliminary Hybrid Work Assessment (Fehr & Peers, June 2022) report, the total number of morning inbound peak hour persons traveling across the gateways has declined 63%; of those people, the proportion using single-occupant vehicles (SOVs) has increased from 57% to 62%, the proportion using high-occupancy vehicle (HOVs) has increased from 11% to 18%, and the proportion using transit has decreased from 28% to 15%. Similar results are found in the morning inbound 3-hour peak period. Further, the evening commute has similar trends.

Exhibit 10
Figure 11
Peak Hour Traffic Volumes, Traffic Control, Lane Configurations, and Level of Service Existing Conditions
300 (270)
346 (35)
711 (63)
30 (13)
99 (49)
122 (370)
16 (29)
88 (419)
6 (8)
18 (10)
16 (77)
58 (435)

1. San Antonio Rd/Bayshore Pkwy
633 (204)
768 (575)
43 (414)
205 (815)
585 (145)
475 (334)

2. San Antonio Rd/US-101 Ramps
347 (135)
1,155 (163)
853 (181)
107 (63)
204 (130)
86 (405)
28 (48)
135 (751)
23 (33)
20 (35)
65 (168)
125 (581)

3. Amphitheatre Pkwy/Rengstorff Ave/Garcia Ave/Charleston Rd 336 (274)
1,353 (258)
285 (334)
95 (196)
243 (1,270) 925 (230)

4. Rengstorff Ave/US-101 NB Ramps
41 (85)
869 (379)
77 (135)
168 (93)
38 (161)
48 (161)
237 (351)
226 (594)
117 (675)
590 (73)
47 (38)
147 (156)

5. Rengstorff Ave/US-101 SB Ramps
100 (147)
662 (375)
5 (6)
150 (133)
15 (18)
67 (199)
134 (168)
266 (735)
17 (14)
180 (83)
34 (126)
5 (4)

6. Rengstorff Ave/Leghorn St
48 (146)
3 (7)
18 (43)
79 (95)
755 (247)
79 (77)
0 (1)
8 (0)
7 (7)
9 (38)
129 (474)
52 (66)

7. Landings Dr/Charleston Rd
57 (170)
36 (15)
15 (28)
131 (52)
321 (164)
221 (129)
37 (69)
11 (52)
4 (24)
18 (18)
130 (226)
9 (3)

8. Alta Ave/Charleston Rd
Bayshore Parkway
San Antonio Road
Garcia Avenue Charleston Road
Amphitheatre ParkwayRengstorff Avenue
US-101 NB Ramps US-101 NB Off Ramp
Rengstorff Avenue
US-101 SB Ramps
Rengstorff Avenue
Leghorn Street
Rengstorff Avenue
Charleston Road
Landings Drive
Charleston Road
Alta Avenue
34 (92)
20 (18)
58 (51)
15 (5)
296 (235)
88 (25)
5 (44)
8 (30)
14 (67)
65 (18)
97 (142)
20 (12)

9. Huff Ave/Charleston Rd
Charleston Road
Huff Avenue
13 (35)
0 (0)
38 (46)
1 (0)
296 (320)
72 (35)
0 (0)
0 (0)
0 (0)
0 (0)
166 (140)
50 (89)

10. Joaquin Rd/Charleston Rd
Charleston Road
Joaquin Road
178 (156)
582 (194)
177 (20)
110 (47)
130 (58)
75 (248)
41 (57)
174 (639)
66 (37)
27 (73)
44 (113)
65 (248)

11. N Shoreline Blvd/Charleston Rd
0 (0)
3 (1)
0 (1)
2 (10)
8 (27)
1 (0) 6 (0)
2 (1)
64 (218)
153 (75)
24 (1)
1 (0)

12. Alta Ave/Plymouth St
Charleston Road
N Shoreline Boulevard
Plymouth St
Alta Ave
US-101 Ramps
San Antonio Road
STOP
STOP
STOP
STOP
STOP
acf
bf
ace
ad
ce
cf
af
accf
ace
acce
aae
acc
f
ccf
f
ace
acf
aace
abf
ace
bf
ace
d
ae
ace
d
ace
ae
ace
ae
ace
ae
ace
ae
ace
ae
acf
ae
ace
ace
ace
ace
ae
d
d
d
d
# Study Intersection
Lane Configuration
acf
Peak Hour Traffic VolumeAM (PM)
STOP
Stop Sign
Signalized
LEGEND
AM
PM
A
-
C
D
E
F
STOP
Exhibit 10
Figure 11
Peak Hour Traffic Volumes, Traffic Control, Lane Configurations, and Level of Service Existing Conditions
16 (9)
63 (297)
8 (19)
0 (0)
54 (129)
139 (48)
187 (50)

13. Huff Ave/Plymouth St
10 (8)
9 (7)
1 (14)
11 (0)
95 (251)
16 (204)
22 (8)
6 (145)
34 (76)
246 (38)
349 (76)
0 (5)

14. Joaquin Rd/Plymouth St
6 (6)
1,465 (299)
24 (54)
0 (0)
0 (0)
1 (0) 0 (0)
355 (1,324)
16 (14)
16 (11)
0 (0)
15 (19)

15. Shoreline Blvd/Space Pkwy
628 (112)
1,389 (383)
116 (350)
10 (16)
353 (1,321)
0 (0)
0 (0)
0 (0)

16. Shoreline Blvd/Plymouth St
48 (179)
1,977 (449)
283 (168)
2 (2)
2 (23)
27 (299)
4 (22)
374 (1,417)
86 (127)
60 (42)
4 (8)
52 (102)

17. Shoreline Blvd/Joaquin Rd/Pear Ave
58 (161)
372 (1,667)

18. Shoreline Blvd/US-101 NB Ramps
26 (71)
1,213 (525)
257 (276)
249 (133)
389 (370)
270 (1,285)
544 (1,115)

19. Shoreline Blvd/US-101 SB Ramps 20. Future Intersection Plymouth St
Huff Ave
Space Pkwy
Shoreline Blvd
Plymouth Street
Shoreline Boulevard
Joaquin Road Pear Avenue
Shoreline Boulevard
US-101 NB Ramps
Shoreline Boulevard
US-101 SB Ramps
Shoreline Boulevard
9 (47)
242 (165)
21 (21)
128 (408)

21. Inigo Way/La Avenida St
La Avenida Street
Inigo Way
Plymouth St
Joaquin Rd
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
b
d
e
d
d
d
d
be
d
ace
bf
acc
f
ce
d
abce
d
acce
ae cccf
aaff
ace
aaff
ccf af
e
# Study Intersection
Lane Configuration
acf
Peak Hour Traffic VolumeAM (PM)
STOP
Stop Sign
Signalized
LEGEND
AM
PM
A
-
C
D
E
F
Does Not Exist in Existing Conditions
1,095 (394)
373 (268)
ccf
12 (14)
38 (61)
164 (169)abf
1,254 (490)
279 (566)
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 59

4. Site Access and On-Site Circulation
This chapter evaluates site access and internal circulation for pedestrians, bicyclists, and vehicles, and consistency with the NBPP mobility policies, standards, and guidelines based on the Parking Layout and Circulation Plan site plans provided by the applicant.

4.1 Pedestrian Access and Circulation
Existing pedestrian access and circulation are discussed, followed by an assessment of the proposed pedestrian access.

4.1.1 Existing Pedestrian Access and Circulation
As described in the Existing Conditions chapter, most of the streets in the NBS Master Plan area include at least a four-foot-wide sidewalk. There are a few sidewalk gaps within the NBS Master Plan area, including along Pear Avenue west of Shoreline Boulevard, Shorebird Way south of Charleston Road, Stierlin Court, and Crittenden Lane, as shown on Figure 7.

Meandering sidewalks buffered from the roadway by landscaping exist along the gateway boulevards:

Amphitheatre Parkway, North Shoreline Boulevard, and Charleston Road. Existing multi -use pathways within or near the pedestrian study area include Stevens Creek Trail, Permanente Trail, and the Green Loop. The NBPP defines gateway boulevards as major traffic arteries that serve as primary entry points to North Bayshore and provide access to other streets within the NBS Master Plan site as well as to district parking structures.

4.1.2 Proposed Pedestrian Access and Circulation
The NBS Master Plan site plan was evaluated for internal circulation within the NBS Master Plan and access to transit uses near the site. The NBS Master Plan will add pedestrian trips to the existing sidewalk network from employees who walk to and from work to nearby office locations, who walk to nearby bus stops and the Mountain View Transit Center, located at Castro Street and Central Expressway, and who walk to and from other destinations in the area.

As shown in Figure 12, the NBS Master Plan proposes pedestrian circulation throughout the site shown in red dots. The proposed pedestrian paths provide direct and safe access from surface parking lots to office and commercial developments within the NBS Master Plan site. This plan is consistent with the NBPP standard on pedestrian circulation designs for surface parking lots. A Pedestrian Lane, or Social Spine, is proposed in light red along Grove Street as an alternative path to Charleston Road and Shoreline Boulevard. A Green Loop is proposed, which is a two-way cycle track and pedestrian path, which circulates throughout the site and connects to Permanente Creek Trail. This increases pedestrian access and internal connectivity within the site and provides multi-directional travel for cyclists. This element is consistent Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
60 with the NBPP. The NBPP estimates an increase in pedestrian activity, so providing sidewalks and the Green Loop throughout the NBS Master Plan site is consistent with the NBPP.

While the NBS Master Plan provides circulation throughout the Master Plan area, Figure 13 shows our recommendations in refining the proposed pedestrian access and circulation:

1. Minimize the number of driveways along Shoreline Blvd from Charleston Rd to Plymouth St

2. Remove or modify pedestrian circulation to be consistent with Green Loop

3. Show pedestrian facility along Space Park Way and Manzanita St

4. Show pedestrian facility along Space Park Way and Grove St

5. Show pedestrian facilities on both sides of the Private St

6. Show pedestrian facilities on both sides of Manzanita St

7. Show north/south crossings at Plymouth Ave and Joaquin Rd

8. Show north/south crossings at Plymouth Ave and Huff Rd

Exhibit 10
Proposed Pedestrian Circulation
Figure 12
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig12-15.ai Source: North Bayshore Framework Master Plan (Plan 6.1.6 Pedestrian Network, December 2022)DíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒΧɖə Key

PEDESTRIAN CIRCULATION

PEDESTRIAN LANEWAY
(SOCIAL SPINE)

NEW PEDESTRIAN LANE

WAY (SOCIAL SPINE)

LIMITED ACCESS STREET

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

PROJECT AREA
Plan 6.1.6 PEDESTRIAN NETWORK
Note:

SFQQTHFYNTSTKYMJTKKXNYJUJIJXYWNFSGNH^HQJ
YWFNQHTSSJHYNTSGJY\JJSYMJ,WJJS1TTUFSI
8YJ[JSX(WJJP9WFNQ\NQQGJIJYJWRNSJIFYYMJYNRJTK
XZGRNYYNSLYMJHTWWJXUTSINSL5(5FUUQNHFYNTS9MJ
SFQFQNLSRJSYTKYMJYWFNQ\NQQGJHTSYNSLJSYZUTS
HTTWINSFYNTS\NYMYMJFIOTNSNSLQFSIT\SJW
HTSXNIJWFYNTSTKYMJZXJTKYMJFIOTNSNSLUFWHJQFSI
LZWFYNTSTKINXYWNHYX^XYJRX\NYMNS
YMJ)NXYWNHY(JSYWFQ5QFSY
4KKXYWJJYUJIJXYWNFSHTSSJHYNTSXGJY\JJS
8MTWJGNWIFSI5JFW\NQQGJZSIJWYFPJSNS
HTSOZSHYNTS\NYMFIOTNSNSLUWTUJWY^T\SJWX
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQXFWJ
LJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Exhibit 10
Proposed Pedestrian Circulation Recommendations
Figure 13
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig12-15.ai Source for Ped and Bike Comments: Proposed Changes to Street Sections NBS Framework Master Plan, Plan 6.1.6 (December 2022)DíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒΧɖə Key

PEDESTRIAN CIRCULATION

PEDESTRIAN LANEWAY
(SOCIAL SPINE)

NEW PEDESTRIAN LANE

WAY (SOCIAL SPINE)

LIMITED ACCESS STREET

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

PROJECT AREA
Plan 6.1.6 PEDESTRIAN NETWORK
Note:

SFQQTHFYNTSTKYMJTKKXNYJUJIJXYWNFSGNH^HQJ
YWFNQHTSSJHYNTSGJY\JJSYMJ,WJJS1TTUFSI
8YJ[JSX(WJJP9WFNQ\NQQGJIJYJWRNSJIFYYMJYNRJTK
XZGRNYYNSLYMJHTWWJXUTSINSL5(5FUUQNHFYNTS9MJ
SFQFQNLSRJSYTKYMJYWFNQ\NQQGJHTSYNSLJSYZUTS
HTTWINSFYNTS\NYMYMJFIOTNSNSLQFSIT\SJW
HTSXNIJWFYNTSTKYMJZXJTKYMJFIOTNSNSLUFWHJQFSI
LZWFYNTSTKINXYWNHYX^XYJRX\NYMNS
YMJ)NXYWNHY(JSYWFQ5QFSY
4KKXYWJJYUJIJXYWNFSHTSSJHYNTSXGJY\JJS
8MTWJGNWIFSI5JFW\NQQGJZSIJWYFPJSNS
HTSOZSHYNTS\NYMFIOTNSNSLUWTUJWY^T\SJWX
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQXFWJ
LJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Minimize the number of driveways along
Shoreline Blvd from Charleston Rd to
Plymouth
Remove or modify pedestrian circulation
to be consistent with Green Loop
Show pedestrian facility along
Space Park Way and Manzanita St
Showpedestrian facility along
Space Park Way and Grove St
Show pedestrian facilities on
both sides of the Private St
Show pedestrian facilities on
both sides of Manzanita St
Show north/south crossings at
Plymouth Ave and Joaquin Rd
Show north/south crossings
at Plymouth Ave and Huff Rd
❶
❷
❸
❺
❻
❼
❽
❹
COMMENTS FROM FEHR & PEERS#
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 63

4.2 Bicycle Access and Circulation
Existing bicycle access and circulation are discussed, followed by an assessment of the proposed bicycle access.

4.2.1 Existing Bicycle Access and Circulation
As described in the Existing Conditions Chapter, Class II Bike Lanes exist along Shoreline Boulevard, Charleston Road, Amphitheatre Parkway, Bayshore Parkway, and Rengstorff Avenue in the NBS Master Plan area. Class III Bike Routes exist along the segment of Shoreline Boulevard north of Charleston Road.

Existing Class I Shared-Use Paths near the NBS Master Plan area include the Stevens Creek Trail, Permanente Creek Trail, and the Green Loop, all of which have asphalt or concrete surfaces.

4.2.2 Proposed Bicycle Access and Circulation
The NBS Master Plan site plan was evaluated for internal circulation within the NBS Master Plan, which will add bicycle trips to the existing bicycle network from employees who bike to and from work to nearby office locations, and those who take transit and then bike to work.

As shown in Figure 14, the NBS Master Plan proposes bicycle circulation throughout the site. The NBS Master Plan proposes a Class I Green Loop, which is a two-way cycle track and pedestrian path, which circulates throughout the site and connects to Permanente Creek Trail. This increases pedestrian access and internal connectivity within the site and provides multi-directional travel for cyclists. The NBPP identifies Green Ways for the exclusive use of bicyclists and pedestrians. Green Ways are identified as being restricted to bicyclists and pedestrians to create a connected network of walking and biking paths.

The Green Loop element is consistent with the NBPP identification of Green Ways.

The NBS Master Plan proposes a Class II buffered on-street bicycle lane on Shoreline South of Monarch Street, and along a segment of Plymouth. This element is consistent with the NBPP. The NBPP states that designated Class II bike lanes will be provided for most of the neighborhood and access streets to allow for safe and direct connection throughout the site. In the NBPP, some neighborhood, access, and service streets with low design speed and traffic volume are designated as shared streets, where motor vehicles and bicycles share the same path. The NBPP identifies Class II bicycle lanes as critical to completing gaps in the bicycle network to allow for safe and direct connections throughout the area and to regional facilities; therefore, this element is consistent with the NBPP.

The NBS Master Plan proposes a Class IV separated bi-directional cycle track along Shoreline Boulevard North of Monarch Street, the west side of Shoreline Boulevard, Charleston Road west of Shoreline Boulevard and Black Street north of Shorebird Way. The NBS Master Plan proposes a separated one-way bike lane along Huff Avenue, C St, Monarch Street, Joaquin Road, Grove Street, Manzanita Street, Space Park Way, Monarch Street, Willow Street, Inigo Way, Main Street, and Charleston Road. The NBPP identifies Charleston Road as a major component of the bicycle network. Providing a cycle track along Charleston Road would enable bicyclists to travel through the site plan area within their own exclusive right-of-way to minimize conflict with vehicle traffic on the road. Refer to Chapter 4.3: Pedestrian and Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
64 Bicycle Access to Facilities for a more detailed description of directions and paths of travel to land uses in the area. Appendix C includes detailed cross sections from the NBS Master Plan with City Comments.

While the NBS Master Plan provides circulation throughout the site, the NBS Master Plan should consider the below recommendations, also shown in Figure 15:

1. Show a bicycle facility connection to Monarch St

2. Make Class IV separated one way cycle track to conform to cross section on Charleston Rd west of Joaquin Rd

3. Indicate connection at Inigo Way to south of Space Park Way

4. Indicate connection at Manzanita St to south of Space Park Way

5. Indicate connection at Grove St to south of Space Park Way

6. Indicate connection at Joaquin Rd to south of Plymouth St

7. Indicate connection at Huff Ave to south of Plymouth St

8. Indicate connection at Willow St to south of Monarch St

9. Indicate connection at Main St to south of B St

Exhibit 10
Proposed Bicycle Circulation
Figure 14
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig12-15.ai Source: North Bayshore Framework Master Plan (Plan 6.1.7 Bicycle Network, December 2022)ɗɐΧDíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒ /Yh=c/JD͝CJ/=/cz
Plan 6.1.7 BICYCLE NETWORK
Note:

SFQQTHFYNTSTKYMJTKKXNYJUJIJXYWNFSGNH^HQJ
YWFNQHTSSJHYNTSGJY\JJSYMJ,WJJS1TTUFSI
8YJ[JSX(WJJP9WFNQ\NQQGJIJYJWRNSJIFYYMJYNRJTK
XZGRNYYNSLYMJHTWWJXUTSINSL5(5FUUQNHFYNTS9MJ
SFQFQNLSRJSYTKYMJYWFNQ\NQQGJHTSYNSLJSYZUTS
HTTWINSFYNTS\NYMYMJFIOTNSNSLQFSIT\SJW
HTSXNIJWFYNTSTKYMJZXJTKYMJFIOTNSNSLUFWHJQFSI
LZWFYNTSTKINXYWNHYX^XYJRX\NYMNS
YMJ)NXYWNHY(JSYWFQ5QFSY
4KKXYWJJYUJIJXYWNFSHTSSJHYNTSXGJY\JJS
8MTWJGNWIFSI5JFW\NQQGJZSIJWYFPJSNS
HTSOZSHYNTS\NYMFIOTNSNSLUWTUJWY^T\SJWX
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQXFWJ
LJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Key

CLASS I -

GREEN LOOP

CLASS II-

BUFFERED ON STREET

BIKE LANES

CLASS IV-

SEPARATED BI-

DIRECTIONAL CYCLE TRACK

CLASS IV -

SEPARATED ONE-

WAY CYCLE TRACK

FUTURE BIKE PATH ON

PRIVATE PROPERTY

OWNED BY OTHERS

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

LIMITED ACCESS STREET

PROJECT AREA
Exhibit 10
ɗɐΧDíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒ /Yh=c/JD͝CJ/=/cz
Plan 6.1.7 BICYCLE NETWORK
Note:

SFQQTHFYNTSTKYMJTKKXNYJUJIJXYWNFSGNH^HQJ
YWFNQHTSSJHYNTSGJY\JJSYMJ,WJJS1TTUFSI
8YJ[JSX(WJJP9WFNQ\NQQGJIJYJWRNSJIFYYMJYNRJTK
XZGRNYYNSLYMJHTWWJXUTSINSL5(5FUUQNHFYNTS9MJ
SFQFQNLSRJSYTKYMJYWFNQ\NQQGJHTSYNSLJSYZUTS
HTTWINSFYNTS\NYMYMJFIOTNSNSLQFSIT\SJW
HTSXNIJWFYNTSTKYMJZXJTKYMJFIOTNSNSLUFWHJQFSI
LZWFYNTSTKINXYWNHYX^XYJRX\NYMNS
YMJ)NXYWNHY(JSYWFQ5QFSY
4KKXYWJJYUJIJXYWNFSHTSSJHYNTSXGJY\JJS
8MTWJGNWIFSI5JFW\NQQGJZSIJWYFPJSNS
HTSOZSHYNTS\NYMFIOTNSNSLUWTUJWY^T\SJWX
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQXFWJ
LJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Key

CLASS I -

GREEN LOOP

CLASS II-

BUFFERED ON STREET

BIKE LANES

CLASS IV-

SEPARATED BI-

DIRECTIONAL CYCLE TRACK

CLASS IV -

SEPARATED ONE-

WAY CYCLE TRACK

FUTURE BIKE PATH ON

PRIVATE PROPERTY

OWNED BY OTHERS

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

LIMITED ACCESS STREET

PROJECT AREA
Proposed Bicycle Circulation Recommendations
Figure 15
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig12-15.ai Source for Ped and Bike Comments: Proposed Changes to Street Sections NBS Framework Master Plan, Plan 6.1.7 (December 2022) Show a bicycle facility
connection to Monarch St
❷
❶
❺
❼
❻
❾
❹
❸
❽
Charleston Rd west of Joaquin
Rd: make Class IV separated
one way cycle track to conform
to cross section
Indicate connection at Grove St
to south of Space Park Way
Indicate connection at Huff Ave
to south of Plymouth St
Indicate connection at Joaquin
Rd to south of Plymouth St
Indicate connection at Main St
to south of B St
Indicate connection at Manzanita
St to south of Space Park Way
Indicate connection at Inigo Way
to south of Space Park Way
Indicate connection at Willow St
to south of Monarch St
COMMENTS FROM FEHR & PEERS#
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 67

4.3 Pedestrian and Bicycle Access to Facilities
This section discusses the internal pedestrian and bicycle access to transit, parking, residential, office, and ground floor active locations. This is an explanation of how and where people are walking and bicycling within the NBS Master Plan area and it provides information about order of magnitude of pedestrian and bicycle activity.

4.3.1 Pedestrians and Bicyclists Pathways to Transit
Within the bicycle study area, a portion of Charleston Road and Shoreline Boulevard are defined by the NBPP to have a transit boulevard overlay, which prioritizes transit and shuttles over other modes of transportation. Within the NBS Master Plan site bicycling paths and distances to the transit stops on Charleston Road and Shoreline Boulevard are summarized below:
• The primary bicycling paths to the transit stop on Charleston Road west of Shoreline Boulevard include the cycle tracks along Joaquin Road, Shoreline Boulevard, and Charleston Road. The stop is within a 5-minute bike ride from most of the office and residential buildings within the NBS Master Plan boundary.
• The primary bicycling paths to the transit stop on Charleston Road east of Shoreline Boulevard include the cycle tracks along Shoreline Boulevard and Charleston Road. The stop is within a 5-minute bike ride from most of the office and residential buildings within the NBS Master Plan area. • The primary bicycling paths to the transit stop on Shoreline Boulevard include cycle tracks along Shoreline Boulevard and the portion of the Green Loop south of Charleston Road. The stop is within a 5-minute bike ride from most of the office and residential buildings within the NBS Master Plan area.

The pedestrian access paths are similar to those for bicyclists, since sidewalks are provided along both sides of streets with appropriate pedestrian crossing locations and are designed to account for the pedestrian volume along these pathways.

Figure 16 shows the pedestrian and bicyclist pathways to transit stops for the core of the NBS Master Plan. In the Traffic Forecasts chapter, the NBS Master Plan will have an estimated 2,380 AM peak hour and 2,110 PM peak hour transit riders walking to/from the nearby transit stops (these transit riders will require approximately 250 AM peak hour and 240 PM peak hour transit vehicles). The primary routes are routes where the most bicycle and pedestrian traffic is expected, while the secondary routes are the routes which will be less frequented. Primary routes include: Charleston Road, Monarch Street, Space Park Way, Joaquin Road, Shoreline Boulevard, Manzanita Street, and Inigo Way. Secondary routes include: Shorebird Way, the Green Loop, Monarch Street (east of Shoreline Boulevard), Huff Avenue, Main Street, Shoreline Boulevard, the Social Spine, Grove Street, and Willow Street. Marine Way garages will include a multimodal hub to transport people via Garcia Avenue and Charleston Road to the core of the NBS Master Plan.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
68 4.3.2 Pedestrians and Bicyclists Pathways to District Parking Garages The district parking north of Charleston Road is the primary parking location for office uses within the NBS Master Plan area. The main bicycling paths for office workers traveling between the district parking and office uses (via Google Bikes) include the cycle tracks along Shoreline Boulevard and Charleston Road as well as the Green Loop. The district parking is within a 5-minute bike ride from the office buildings within Shorebird and Joaquin north and a 10-minute bike ride from the rest of the office and residential buildings within the Master Plan area. Marine Way garages will include a multimodal hub to transport people via Garcia Avenue and Charleston Road to the core of the NBS Master Plan. Because the NBS Master Plan provides a general level of detail of the land use and transportation network, there will be a need to conduct additional transportation analysis during the PCP (Planned Community Permit) stage . In addition, the City may require subsequent site-specific transportation analysis to ensure that each mode of travel and the project site are designed and built to the City’s specifications. The NBS Master Plan identifies multimodal hubs in the Amphitheatre (SA-P-1) and Marine Way (MW-P-1 and MW-P-2) district parking structures. As part of the PCP, the location at the district parking structures, modal services provided, as well as, modal access at the multimodal hub will need to be specified for each. In addition, a corridor specific analysis will need to be completed to evaluate walking, biking, and transit access between the hubs and the NBS Master Plan area – especially along Shoreline Boulevard, Garcia Avenue, Charleston Road, and Amphitheatre Parkway. The corridor analysis should describe the demand by mode, their effects, and potential transportation improvements to support the increased walking/biking/transit activity along each of these corridors. The corridor analysis will also require evaluation of vehicle operations.

Figure 17 shows the pedestrian and bicyclist pathways to the district parking garages for the core of the NBS Master Plan. The project is expected to generate vehicle demand to/from the NBS Master Plan area (SOV: 3,510 AM peak hour and 3,860 PM peak hour and HOV: 360 AM peak hour and 460 PM peak hour; Total: 3,870 AM peak hour and 4,320 PM peak hour). Many of these vehicles (2,520 AM peak hour and 2,400 PM peak hour) will park in District parking garages and the occupants will becom e pedestrians, bicyclists, or transit riders (2,820 AM peak hour and 2,690 PM peak hour) as they travel from the garages to their destination (Refer to Appendix F for these calculations). The NBS Master Plan streets are designed to accommodate these North Bayshore travel characteristics by prioritizing pedestrians, bicyclists, and/or transit riders. The primary routes are routes where the most bicycle and pedestrian traffic is expected, while the secondary routes are the routes which will be used less. Primary routes include:

Charleston Road, Shorebird Way, Monarch Street, portion of Pear Avenue, Joaquin Road, southern portion of Main Street, Shoreline Boulevard, the Social Spine, Grove Street, southern portion of Manzanita Street, Willow Street, and Inigo Way. Secondary routes include: a portion of the Green Loop, Space Park Way, Huff Street, C Street, southern portion of Joaquin Road, and portions of Pear Avenue and B Street. Marine Way garages will include a multimodal hub to transport people via Garcia Avenue and Charleston Road to the core of the NBS Master Plan.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 69

4.3.3 Pedestrians and Bicyclists Pathways between Residential and Office Figure 18 shows the pedestrian and bicyclist pathways between the residential and office land uses for the core of the NBS Master Plan. In the Traffics Forecasts chapter, the NBS Master Plan is expected to generate pedestrian demand (2,570 AM peak hour and 2,360 PM peak hour), bicycle demand (640 AM peak hour and 590 PM peak hour), and additional pedestrian and bicycle travel will occur to/from the district garages and transit stops. The primary routes are routes where the most bicycle and pedestrian traffic is expected, while the secondary routes are the routes which will be used less. Primary routes include: Charleston Road, portion of the Green Loop, Shorebird Way, Space Park Way, Joaquin Road, Main Street, portion of Shoreline Boulevard, the Social Spine, portion of Manzanita Street, and Inigo Way , Monarch Street, Space Park Way, Joaquin Road, Shoreline Boulevard, Manzanita Street, and Inigo Way.

Secondary routes include: Monarch Street, Pear Avenue, Huff Street, portion of Shoreline Boulevard, Shorebird Way, Grove Street, Manzanita Street, and Willow Street. Because the NBS Master Plan provides a general level of detail of the land use and transportation network, there will be a need to conduct additional transportation analysis during the PCP (Planned Community Permit) stage and may require subsequent site-specific transportation analysis to ensure that each mode of travel and the project site are designed and built to the City’s specifications.

4.3.4 Orientation of Buildings to Bicycle Facilities and Ground Floor Activity Within the bicycle routes, most of the ground-floor activities are generated at the frontage of active use areas along Shorebird Way, Monarch Street, and the Social Spine. Bicycle facilities are provided along Shoreline Boulevard, Charleston Road, Shorebird Way, and Manzanita Street for bicyclists traveling from office and residential building to active use areas. Because the NBS Master Plan provides a general level of detail of the land use and transportation network, there will be a need to conduct additional transportation analysis during the PCP (Planned Community Permit) stage and may require subsequent site-specific transportation analysis to ensure that each mode of travel and the project site are designed and built to the City’s specifications.

Exhibit 10
DíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒΧɓɓ Note:
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQXFWJ
LJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Plan 4.1.2 AND USE (CORE MASTER PLAN AREA)
Key
OFFICE

RESIDENTIAL

ACTIVE USES
HOTEL

FLEX - PARKING,

RESIDENTIAL

FLEX - COMMUNITY USE,

DISTRICT SYSTEMS

PARKING

DISTRICT CENTRAL PLANT

GREEN LOOP

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

LIMITED ACCESS STREET

PROJECT AREA

NBPP BOUNDARY

AREA NOT SUBJECT TO

REDEVELOPMENT

PEAR AVENUE

SHORELINE

C STREET

SPACE PARK WAY

SHOREBIRD WAY

INIGO WAY

CHARLESTON RD

MONARCH ST

JOAQUIN RD

PEAR AVENUE
Green Loop
Open Space
Residential
Office
Hotel
Primary Pedestrian and Bicycle Routes
Secondary Pedestrian and Bicycle Routes
T ransit Stops
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig16-18.ai Figure 16
Pathways to Transit Stops
Source: North Bayshore Framework Master Plan Frame Work (December 2022) Exhibit 10
DíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒΧɓɓ Note:
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQXFWJ
LJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Plan 4.1.2 AND USE (CORE MASTER PLAN AREA)
Key
OFFICE

RESIDENTIAL

ACTIVE USES
HOTEL

FLEX - PARKING,

RESIDENTIAL

FLEX - COMMUNITY USE,

DISTRICT SYSTEMS

PARKING

DISTRICT CENTRAL PLANT

GREEN LOOP

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

LIMITED ACCESS STREET

PROJECT AREA

NBPP BOUNDARY

AREA NOT SUBJECT TO

REDEVELOPMENT
DíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒΧɓɓ Note:
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQXFWJ
LJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Plan 4.1.2 AND USE (CORE MASTER PLAN AREA)
Key
OFFICE

RESIDENTIAL

ACTIVE USES
HOTEL

FLEX - PARKING,

RESIDENTIAL

FLEX - COMMUNITY USE,

DISTRICT SYSTEMS

PARKING

DISTRICT CENTRAL PLANT

GREEN LOOP

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

LIMITED ACCESS STREET

PROJECT AREA

NBPP BOUNDARY

AREA NOT SUBJECT TO

REDEVELOPMENT

SHORELINE

SPACE PARK WAY

SHOREBIRD WAY

INIGO WAY

CHARLESTON RD

MONARCH ST

JOAQUIN RD
Amphitheatre
District Garage
(SA-P-1)
District Garage
(JS-P-1)
District Garage
(JN-P-1)
District Garage
(SB-P-1)
Amphitheatre
District Garage
(SA-P-1)
District Garage
(JS-P-1)
District Garage
(JN-P-1)
District Garage
(SB-P-1)
Green Loop
Open Space
Residential
Office
Hotel
Primary Pedestrian and Bicycle Routes
Secondary Pedestrian and Bicycle Routes
District Garage
Podium Parking
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig16-18.ai Figure 17
Pathways to District Parking Garages
Source: North Bayshore Framework Master Plan Frame Work (December 2022) Exhibit 10
DíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒΧɓɓ Note:
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQXFWJ
LJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Plan 4.1.2 AND USE (CORE MASTER PLAN AREA)
Key
OFFICE

RESIDENTIAL

ACTIVE USES
HOTEL

FLEX - PARKING,

RESIDENTIAL

FLEX - COMMUNITY USE,

DISTRICT SYSTEMS

PARKING

DISTRICT CENTRAL PLANT

GREEN LOOP

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

LIMITED ACCESS STREET

PROJECT AREA

NBPP BOUNDARY

AREA NOT SUBJECT TO

REDEVELOPMENT
DíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒΧɓɓ Note:
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQXFWJ
LJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Plan 4.1.2 AND USE (CORE MASTER PLAN AREA)
Key
OFFICE

RESIDENTIAL

ACTIVE USES
HOTEL

FLEX - PARKING,

RESIDENTIAL

FLEX - COMMUNITY USE,

DISTRICT SYSTEMS

PARKING

DISTRICT CENTRAL PLANT

GREEN LOOP

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

LIMITED ACCESS STREET

PROJECT AREA

NBPP BOUNDARY

AREA NOT SUBJECT TO

REDEVELOPMENT

SHORELINE

SPACE PARK WAY

SHOREBIRD WAY

INIGO WAY

MANZANITA ST

CHARLESTON RD

MONARCH ST

JOAQUIN RD
Green Loop
Open Space
Residential
Office
Hotel
Primary Pedestrian and Bicycle Routes
Secondary Pedestrian and Bicycle Routes
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig16-18.ai Figure 18
Pathways Between Residential and Office
Source: North Bayshore Framework Master Plan Frame Work (December 2022) Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 73

4.4 Vehicle Access and Circulation
Existing vehicle access and circulation are discussed, followed by an assessment of the proposed vehicle access.

4.4.1 Existing Vehicle Access and Circulation
As described in the Existing Conditions chapter, US 101 and SR 85 provide regional access to the study area. The following streets provide local access and are considered the North Bayshore gateways:

Shoreline Boulevard, La Avenida, Rengstorff Avenue, San Antonio Road, and Bayshore Parkway . The speed limits in the NBS Master Plan site range from 25 mph to 35 mph and serve a mix office, residential, and retail traffic.

4.4.2 Proposed Vehicle Access and Circulation
The site plan was evaluated for internal circulation within the NBS Master Plan area, which will add vehicle trips to the existing vehicle network from employees who drive to and from work to nearby office locations. Figure 19 describes the street typologies and proposed vehicle circulation.

The NBPP defines gateway boulevards as major traffic arteries that serve as primary entry points to North Bayshore and provide access to other streets within the NBS Master Plan site as well as to district parking structures. Within the NBS Master Plan site, Shoreline Boulevard, Rengstorff Avenue, and Amphitheater Parkway will all provide primary access to the Amphitheatre Parking Garage and Shoreline Boulevard will provide access to JS-P-1. Rengstorff Avenue and Amphitheatre Parkway will provide primary access to the Amphitheatre Parking Garage. The NBPP defines neighborhood streets as streets at the front door of office, retail, residential buildings, and on-site parking lots that provide access to and from the gateway boulevards.

Deficient vehicle operations will persist even with additional improvements identified at the Shoreline Boulevard and Rengstorff Avenue gateways (refer to the Adverse Motor Vehicle Effects and Improvements chapter for intersection improvement recommendations). During the morning peak hour, the deficient locations occur inbound office vehicle conflicts with the outbound residential vehicles (i.e., Shoreline Boulevard and Space Park Way, Shoreline Boulevard and Pear Avenue, and Shoreline Boulevard and US 101 Northbound Ramps) or the intersection is constrained (Shoreline Boulevard and Charleston Road).

Similar patterns occur in the evening peak hour. During the evening peak hours, the outbound office vehicles will be affected by the inbound residential vehicles (i.e., Rengstorff Avenue and the Rengstorff Connector-US 101 Northbound Ramps, Shoreline Boulevard and Space Park Way, and Shoreline Boulevard and Pear Avenue) or at constrained intersections (i.e., Shoreline Boulevard and Charleston Road and Inigo Way and La Avenida).

4.4.2.1 AM and PM Office and Residential Trips
Figure 20 illustrates the primary inbound office vehicle access routes to the district parking and on -site parking during the morning peak hour for the core area of the NBS Master Plan. The outbound residential Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
74 vehicle routes are also illustrated in Figure 20. Figure 21 illustrates the primary outbound office vehicle access routes to the district parking and on-site office parking during the evening peak hour for the core area of the NBS Master Plan. The inbound residential traffic on Shoreline boulevard and outbound traffic on Rengstorff Avenue are illustrated on Figure 21 to show the conflict points with the outbound office traffic. Both figures illustrate the three potential conflicts between office and residential traffic on Shoreline Boulevard and Rengstorff Avenue (refer to the previous section for additional description of these conflict locations.).

The local streets for the NBS Master Plan are designed to serve the office on-site parking (approximately 10% of the office trips), hotel, commercial, and residential land uses. Most of the office trips will use Shoreline Boulevard and Rengstorff Avenue to access the Amphitheatre District Garage (SA -P-1), which limits the likelihood of office cut-through traffic. Also, given the proximity of the Marine Way garages (MW-P-1 and MW-P-2) office cut-through traffic is eliminated when accessing those garages.

4.5 Emergency and Service Vehicle Access
The NBPP identifies the following streets that facilitate or provide emergency and service vehicle access:
• Neighborhood streets: facilitate emergency access to nearby Access Streets • Access Streets: residential or service-oriented street with spaces for emergency vehicle access, loading, delivery, and refuse pick-up
• Green ways: pedestrian and bicycle facilities with emergency vehicle access Figure 22 shows loading, servicing, and emergency access within the NBS Master Plan site. NBPP standards indicate that the NBS Master Plan must include emergency access on neighborhood and service streets and the Green Way where access is required for vehicles for adjacent uses and through the circulation network.

The Mountain View Fire Department has minimum street widths to accommodate fire trucks. Fire trucks require a minimum inside turning radius of 21 feet. On fire access roads, the width must be at a minimum 20 feet for 3 story buildings and 26 feet for 4 story buildings. Additionally, the Fire Department requires a minimum street width of 20 feet at streets with no through access to ensure there is efficient space for trucks to turn around. Streets with no through access must be at least 20 feet in width and allow for a 35 foot turn radius. Alternatively, if the street ends in a T formation, both streets must be 20 feet wide and allow 30 feet between the two streets to allow the truck to make the turn off of the dead -end street. All streets must conform to these standards, thus constraining street design. Since the emergency and service vehicle access provided by the NBS Master Plan is consistent with the NBPP standards, no additional recommendations are provided.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 75

4.6 District Parking Access Evaluation
The NBS Master Plan allocated 90% of the office parking to the following five district parking locations within the Master Plan area, as shown in blue and orange in Figure 23, to increase land use efficiency:
• District parking at five locations within the Master Plan area include the following:
◦ JN-P-1 (Joaquin North) is located at the southwest corner of Monarch Street and Joaquin Road within the Joaquin North neighborhood and contains approximately 500 parking spaces. JN -P-1 serves active uses and hotel, neighborhood parks, open spaces, and residential visitor parking. ◦ JS-P-1 (Joaquin South) is a 6-level parking garage location in the Joaquin South neighborhood that contains approximately 700 parking spaces. JS-P-1 serves office (450 parking spaces) and retail and hotel uses (250 parking spaces).
◦ SB-P-1 (Shorebird) is located at the northeast corner of Space Park Way and Manzanita Street within the Shorebird neighborhood and contains approximately 600 spaces. SB-P-1 serves hotel and active uses as well as residential visitor parking. ◦ SA-P-1 (Amphitheatre) is a 6-level parking garage located at the northwest corner of Shoreline Boulevard and Charleston Road that contains approximately 4,584 parking spaces for the NBS Master Plan (4,334 parking spaces), the police operations station (10 parking spaces), and the public parking spaces (240 parking spaces). SA-P-1 serves office employee parking. ◦ MW-P-1 & MW-P-2 (Marine Way) are 2- to 3-level parking garages along Marine Way that contain approximately 890 parking spaces. Both parking garages serve office uses.

The demand for these parking garages will be discussed further in the Parking Assessment Chapter. Multi- modal access to the district parking locations was evaluated to ensure compliance with the parking access and design standard in the NBPP. Because the NBS Master Plan provides a general level of detail of the land use and transportation network, there will be a need to conduct additional transportation analysis during the PCP (Planned Community Permit) stage and may require subsequent site -specific transportation analysis to ensure that each mode of travel and the project site are designed and built to the City’s specifications. As shown in Figure 24, we recommend the following elements:

1. Clarify the multimodal access strategy at the MW-P-1 and MW-P-2 district parking structure, including whether there are transit stops, for access to the NBS Master Plan site, and bicycle and pedestrian connections.

2. Clarify whether the entrance to Amphitheatre Parking Garage from Amphitheatre Parkway is gated or has other controlled access.

3. Consider moving the active use parking on Shoreline Boulevard south of Shorebird Way to avoid Green Loop conflicts and use right in right out access.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
76 4.6.1 Driveway Queuing Analysis
A queuing analysis was completed to assess the effects of the district parking at the five garage locations.

The peak hour driveway queuing was evaluated for the following five district parking locations within the NBS Master Plan:
• Joaquin North District Parking Garage (JN-P-1)
• Joaquin South Parking Garage (JS-P-1)
• Shorebird District Parking Garage (SB-P-1)
• Amphitheatre District Parking Garage, Amphitheatre Parkway Entrance (SA-P-1) • Amphitheatre District Parking Garage, Shoreline Boulevard Entrance (SA-P-1) • MW-P-1 & MW-P-2 (Marine Way)
The gated access queueing analysis uses the Poisson distribution (random vehicle arr ivals), inbound traffic volume, and a gate service flow rate. The 95th percentile queue is then calculated and used to determine the storage needed. The queuing analysis considered two gate-control scenarios for each access point— Radio Frequency Identification (RFID) Card and Proximity Card. Table 9 presents a summary of the ingress queues at each driveway. For each driveway, the number of lanes was initially assumed to be one and was increased to two at driveways where the 95th percentile queue exceed 250 feet. Full details of the gated access queueing analysis are included in in Appendix D.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 77 Table 9: Gated Access Queuing Summary
Driveway Number of Lanes Gate Control Type1 Queue Length (ft)2,3
Joaquin North District Parking Garage (JN-P-1) 1

RFID 25
Proximity Card 25
Joaquin South Parking Garage (JS-P-1) 1

RFID 50
Proximity Card 50
Amphitheatre District Parking Garage,
Amphitheatre Parkway Entrance (SA-P-1)
2 RFID 25
Proximity Card >250
Amphitheatre District Parking Garage, Shoreline
Boulevard Entrance (SA-P-1)
2 RFID 75
Proximity Card 100
Shorebird District Parking Garage (SB-P-1) 1

RFID 50
Proximity Card 50
Marine Way District Parking Garage, Casey Ave
Entrance (MW-P-1)
1 RFID 25
Proximity Card 25
Marine Way District Parking Garage, Marine Way
Entrance (MW-P-1)
1 RFID 25
Proximity Card 25
Marine Way District Parking Garage, Bayshore
Parkway Entrance (MW-P-2)
1 RFID 25
Proximity Card 25
Marine Way District Parking Garage, Marine Way
Entrance (MW-P-2)
1 RFID 25
Proximity Card 25
Notes:

1. RFID access assumes a service rate of 800 vehicles/hour/lane, Proximity Card assumes 600 vehicles/hour/lane

2. Reported queue length for RFID and Proximity card are a result of the Gated Access Queuing Analysis, included in Appendix D.

Queue length for No Gate Control is from 95th Percentile queue in Synchro queuing report.

3. Table 9 reports the longer queue from the AM and PM peak hours for each driveway and approach. The queue from the other peak hour can be found in Appendix D.

Source: Fehr & Peers, 2023
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
78 It is recommended that each district parking driveway feature the number of inbound lanes noted in Table 9. To reduce vehicle queueing and to maintain consistency across the various district parking structures, it is recommended that all district parking driveways be equipped with RFID access, since they have higher service rates. If equipped with RFID, the throat length for each garage should be at least the queue length calculated with “RFID” for each driveway, as listed in Table 9. Though not recommended due to the potential for higher queue lengths, should Proximity Card access be utilized, the throat length for each garage should be at least the length calculated with “Proximity Card” for each driveway, potentially even longer for the Amphitheatre District Parking Garage, Amphitheatre Parkway Entrance (SA - P-1).

4.6.2 Driveway LOS Analysis
A vehicle LOS analysis was conducted for the District Parking Garage driveways, utilizing the same lane assumptions as the Gated Access Queuing Analysis. LOS calculations were performed using HCM 6 th Edition methodology with Synchro 11 software. District Access Driveway LOS calculations assume no gated access control. The Cumulative with Project District Parking Garage LOS results are described in Table 10. Full LOS calculation sheets from Synchro 11 are included in Appendix B.

Table 10: District Parking Garage Level of Service – Cumulative with Project Conditions Driveway Control1 Peak
Hour3 Delay3 LOS4
Amphitheatre District Parking Garage:

Amphitheatre Pkwy Entrance (SA-P-1)5 Signalized AM
PM

77.2 67.5
E
E
Amphitheatre District Parking Garage:

Shoreline Blvd Entrance (SA-P-1) Signalized AM
PM

23.1 59.2
C
E
Joaquin North District Parking Garage (JN-P-1) AWSC AM
PM

7.8 8.5
A
A
Joaquin South Parking Garage (JS-P-1) AWSC AM
PM

7.5 8.1
A
A
Shorebird District Parking Garage (SB-P-1) SSSC AM
PM

38.4 55.4
E
F
Marine Way District Parking Garage:

Casey Ave Entrance (MW-P-1) SSSC AM
PM

10.9 11.2
B
B
Marine Way District Parking Garage:

Marine Wy Entrance (MW-P-1) SSSC AM
PM

7.7 10.4
A
B
Marine Way District Parking Garage:

Bayshore Parkway Entrance (MW-P-2) SSSC AM
PM

10.3 10.8
B
B
Marine Way District Parking Garage:

Marine Way Entrance (MW-P-2) SSSC AM
PM

10.2 10.7
B
B

1. Signal refers to a signalized intersection. SSSC = Side-Street Stop Controlled intersection, AWSC= All-Way Stop Controlled Intersection

2. AM = morning peak hour, PM = evening peak hour.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 79

3. Whole intersection weighted average control delay expressed in seconds per vehicle calculated using methods described in the Highway Capacity Manual, 6th Edition. For side-street stop-controlled intersections, total delay for the worst movement approach is reported.

4. LOS = Level of Service. Unless otherwise noted, the LOS calculations conducted using the Synchro level of service analysis software package, which applies the method described in the Highway Capacity Manual, 6th Edition.

5. The LOS on EB Amphitheatre Pkwy at this intersection could be improved by the additional of a second EBL turn lane.

4.7 Adverse Effect Evaluation
As shown in Table 5 and listed below, there are two adverse effect criteria for the site access and circulation evaluation:
• Criterion #1: Project designs for pedestrian, bicycle, and automobile on-site circulation, access, loading, and parking areas fail to meet City or industry standard design practices. • Criterion #2: The project fails to provide adequate accessibility for services and d elivery trucks on-site, including access to truck loading areas.

Because the NBS Master Plan provides a general level of detail of the land use and transportation network, there will be a need to conduct additional transportation analysis during the PCP (P lanned Community Permit) stage and may require subsequent site- specific transportation analysis. The site- specific transportation analysis would ensure that each mode of travel and the project site are designed and built to the City’s specifications. The NBS Master Plan will need to include additional street design details and specifications of truck loading areas. Therefore, further evaluation is needed to evaluate for these criterion.

Exhibit 10
Proposed Vehicle Circulation
Figure 19
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig12-15.ai Source: North Bayshore Framework Master Plan (Plan 6.1.4 Street Classification, December 2022)North B ayshore Frame wor k Mast er Pl an - Decem ber 20 22 | 67 Plan 6.1.4 STRE ET CL ASSIFICATION
Note:

T
trail connection between the Green Loop and
Stevens Creek Trail will be determined at the time of
submitting the corresp onding PCP application. The
nal alignment of the tr ail will be contingent upon 1)
coordination with the ad joining land o wner 2)
consideration of the use of the ad joining parcel, and
3 the DCP.

Off-street pedestrian connections between
Shoreb ird and Pear will be undertaken in
conjunction with ad joining property o wners.

This Plan is part of the North Bay shore Framework
Master Plan. This Plan demonstrates a conceptual
plan for the future development of the Master Plan
Area. Roadway al ignments, and land use par cels are
general de pictions. This Master Plan may be
s
City c omments as part of the design review
process, and future zoning permit applications.

Key

GATEWA Y BOULEVARD

NEIGHBORH OOD STREET

PRIVATE ACCESS STREET

TRANSI T BOULEVARD

LIMITE D ACCES S STREET

PRIVATE

STREET(L IMITED

ACCESS)

PARKING

OPEN SPACE

INDICATIV E LOCATION

OF MID-BLOC K BREAKS/

PRIVAT E DRIVEWAYS

CONCEPTUAL

DEVELOPMEN T BLO CKS

PROJEC T AREA
Exhibit 10
ɓɒΧDíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒ =Dh]

Note:
8&5
&RUMNYMJFYWJ5FWPNSL,FWFLJNXFUQFSSJI
UFWPNSLLFWFLJYMFY\TZQIUWT[NIJUFWPNSLKTWZXJX
QTHFYJI\NYMNSYMJ2FXYJW5QFS&WJF9MJUFWPNSL
LFWFLJ\NQQGJUFWYTKYMJ2FXYJW5QFSѣX(*6&WJ[NJ\
GZY\NQQWJVZNWJF)JXNLS7J[NJ\5JWRNYFXNYNX
QTHFYJITZYXNIJTKYMJ3'55FWJF
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQXFWJ
LJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Plan 4.1.1 LAND USE
Key
OFFICE

RESIDENTIAL

ACTIVE USES
HOT
EL

FLEX - PARKING,

RESIDENTIAL

FLEX - COMMUNITY USE,

DISTRICT SYSTEMS

PARKING

DISTRICT CENTRAL PLANT

GREEN LOOP

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

LIMITED ACCESS STREET

PROJECT AREA

NBPP BOUNDARY

AREA NOT SUBJECT TO

REDEVELOPMENT
ɓɒΧDíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒ =Dh]

Note:
8&5
&RUMNYMJFYWJ5FWPNSL,FWFLJNXFUQFSSJI
UFWPNSLLFWFLJYMFY\TZQIUWT[NIJUFWPNSLKTWZXJX
QTHFYJI\NYMNSYMJ2FXYJW5QFS&WJF9MJUFWPNSL
LFWFLJ\NQQGJUFWYTKYMJ2FXYJW5QFSѣX(*6&WJ[NJ\
GZY\NQQWJVZNWJF)JXNLS7J[NJ\5JWRNYFXNYNX
QTHFYJITZYXNIJTKYMJ3'55FWJF
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQXFWJ
LJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Plan 4.1.1 LAND USE
Key
OFFICE

RESIDENTIAL

ACTIVE USES
HOT
EL

FLEX - PARKING,

RESIDENTIAL

FLEX - COMMUNITY USE,

DISTRICT SYSTEMS

PARKING

DISTRICT CENTRAL PLANT

GREEN LOOP

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

LIMITED ACCESS STREET

PROJECT AREA

NBPP BOUNDARY

AREA NOT SUBJECT TO

REDEVELOPMENT
OFFICE

RESIDENTIAL
HOTEL

PRIMARY OFFICE VEHICLE ROU TES

PRIMARY RESIDENTIAL VEHICLE ROUTES

DEFICIENT LOCATIONS WITH

OPERATIONAL IMPROVEMENTS

NORTH BAYSHORE

MASTER PLAN LANDUSES
Figure 20
W:\San Jose N Drive\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig20_21_Peak_Hour_Office_Parking.ai Morning Peak Hour Office and Residential Vehicle Trips
Exhibit 10
Key

ACTIVE U SES

FLEX - HOTEL, PARKING

FLEX - PARKI NG, RESIDENTIAL

FLEX - COMMUNITY USE,

DISTRICT CENTRAL PLANT

PARKING

DISTRICT CENTRAL PLANT

GREEN LOOP

INDICATIVE LOCAT ION OF

MID-BL OCK BREAK

CONCEPTUAL DEVELOPMENT

PARCELS

OPEN SPACE

PUBLIC ROW FOR NON-

MOTORIZED TRAFFIC,

SERVICING AND EMERGENCY

VEHICLES ONLY

PROJECT AREA

NBPP BOUNDARY
ɓɒΧDíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒ =Dh]

Note:
8&5
&RUMNYMJFYWJ5FWPNSL,FWFLJNXFUQFSSJI
UFWPNSLLFWFLJYMFY\TZQIUWT[NIJUFWPNSLKTWZXJX
QTHFYJI\NYMNSYMJ2FXYJW5QFS&WJF9MJUFWPNSL
LFWFLJ\NQQGJUFWYTKYMJ2FXYJW5QFSѣX(*6&WJ[NJ\
GZY\NQQWJVZNWJF)JXNLS7J[NJ\5JWRNYFXNYNX
QTHFYJITZYXNIJTKYMJ3'55FWJF
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQXFWJ
LJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Plan 4.1.1 LAND USE
Key
OFFICE

RESIDENTIAL

ACTIVE USES
HOT
EL

FLEX - PARKING,

RESIDENTIAL

FLEX - COMMUNITY USE,

DISTRICT SYSTEMS

PARKING

DISTRICT CENTRAL PLANT

GREEN LOOP

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

LIMITED ACCESS STREET

PROJECT AREA

NBPP BOUNDARY

AREA NOT SUBJECT TO

REDEVELOPMENT
OFFICE

RESIDENTIAL
HOTEL

PRIMARY OFFICE VEHICLE ROU TES

PRIMARY RESIDENTIAL VEHICLE ROUTES

DEFICIENT LOCATIONS WITH

OPERATIONAL IMPROVEMENTS

NORTH BAYSHORE

MASTER PLAN LANDUSES
Figure 21
W:\San Jose N Drive\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig20_21_Peak_Hour_Office_Parking.ai Evening Peak Hour Office and Residential Vehicle Trips
ɓɒΧDíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒ =Dh]

Note:
8&5
&RUMNYMJFYWJ5FWPNSL,FWFLJNXFUQFSSJI
UFWPNSLLFWFLJYMFY\TZQIUWT[NIJUFWPNSLKTWZXJX
QTHFYJI\NYMNSYMJ2FXYJW5QFS&WJF9MJUFWPNSL
LFWFLJ\NQQGJUFWYTKYMJ2FXYJW5QFSѣX(*6&WJ[NJ\
GZY\NQQWJVZNWJF)JXNLS7J[NJ\5JWRNYFXNYNX
QTHFYJITZYXNIJTKYMJ3'55FWJF
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQXFWJ
LJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Plan 4.1.1 LAND USE
Key
OFFICE

RESIDENTIAL

ACTIVE USES
HOT
EL

FLEX - PARKING,

RESIDENTIAL

FLEX - COMMUNITY USE,

DISTRICT SYSTEMS

PARKING

DISTRICT CENTRAL PLANT

GREEN LOOP

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

LIMITED ACCESS STREET

PROJECT AREA

NBPP BOUNDARY

AREA NOT SUBJECT TO

REDEVELOPMENT
Exhibit 10
Emergency and Service Vehicle Access
Figure 22
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig12-15.ai Source: North Bayshore Framework Master Plan (Plan 6.1.12 Loading, Servicing & Access and Plan 6.1.13 Emergency Access, December 2022)
DíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒΧɗɕ Plan 6.1.12 LOADING, SERVICING & ACCESS
Key

PREFERRED LOCATIONS

FOR OFF-STREET LOADING

PRIMARY TRUCK ROUTING

SECONDARY TRUCK

ROUTING

PROTECTED EDGE
- NO PARKING OR

LOADING ACCESS

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

LIMITED ACCESS STREET

PROJECT AREA
Note:
4KKXYWJJYQTFINSLFHHJXXFQTSLIWN[J\F^XFSI
RNIGQTHPGWJFPXNXHTSHJUYZFQ+NSFQQTHFYNTSX^JY
WRJI
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQXFWJ
LJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX

PREFE RRE D LOCAT IONS

FOR OFF-STREE T LOADING

FIRE APPARATUS ACCESS

ROAD BY OTHERS

FIRE APPARATUS ACCESS
ROAD (20' WIDTH MINIMUM)

AERIAL FIRE APPARATUS

ACCESS ROAD BY OTHERS

PRI MAR Y TRUC K ROUTING

SEC ONDAR Y TRUCK

ROUTING

PROTECTE D EDGE
- NO PARKIN G OR

LOADIN G ACCESS

INDICATIV E LOCATION

OF MID-BLOC K BREAKS/

PRIVAT E DRIVEWAYS

AERIAL FIRE APPARATUS

ACCESS ROAD
(26' WIDTH MINIMUM)
D

CONCEPTUAL

EVELOPMEN T BLO CKS

OPEN SPACE

LIMITE D ACCES S STREET

PROJEC T AREA
Exhibit 10
District Parking Access
Figure 23
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig12-15.ai Source: North Bayshore Framework Master Plan (Plan 6.1.10 District Parking Strategy, December 2022)DíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒΧɗɓ Plan 6.1.10 DISTRICT PARKING STRATEGY
Note:
8&5
&RUMNYMJFYWJ5FWPNSL,FWFLJNXFUQFSSJI
UFWPNSLLFWFLJYMFY\TZQIUWT[NIJUFWPNSLKTWZXJX
QTHFYJI\NYMNSYMJ2FXYJW5QFS&WJF9MJUFWPNSL
LFWFLJ\NQQGJUFWYTKYMJ2FXYJW5QFSѣX(*6&
WJ[NJ\GZY\NQQWJVZNWJF)JXNLS7J[NJ\5JWRNYFXNY
NXQTHFYJITZYXNIJTKYMJ3'55FWJF
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQX
FWJLJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Key

ACTIVE USE PARKING

DISTRICT PARKING

ACTIVE USE, HOTEL

PARKING
10% OFFICE ON-

SITE PARKING

RESIDENTIAL

PODIUM PARKING

ECO GEM SURFACE

PARKING

GARAGE ACCESS

PEDESTRIAN WALK SHED

CONCEPTUAL GARAGE

FOOTPRINT

LIMITED ACCESS STREET

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

PROJECT AREA
Exhibit 10
District Parking Access Comments
Figure 24
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig12-15.ai Source for Parking Comments: Proposed Changes to Street Sections NBS Framework Master Plan, Plan 6.1.10 (December 2022)DíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒΧɗɓ Plan 6.1.10 DISTRICT PARKING STRATEGY
Note:
8&5
&RUMNYMJFYWJ5FWPNSL,FWFLJNXFUQFSSJI
UFWPNSLLFWFLJYMFY\TZQIUWT[NIJUFWPNSLKTWZXJX
QTHFYJI\NYMNSYMJ2FXYJW5QFS&WJF9MJUFWPNSL
LFWFLJ\NQQGJUFWYTKYMJ2FXYJW5QFSѣX(*6&
WJ[NJ\GZY\NQQWJVZNWJF)JXNLS7J[NJ\5JWRNYFXNY
NXQTHFYJITZYXNIJTKYMJ3'55FWJF
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQX
FWJLJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Key

ACTIVE USE PARKING

DISTRICT PARKING

ACTIVE USE, HOTEL

PARKING
10% OFFICE ON-

SITE PARKING

RESIDENTIAL

PODIUM PARKING

ECO GEM SURFACE

PARKING

GARAGE ACCESS

PEDESTRIAN WALK SHED

CONCEPTUAL GARAGE

FOOTPRINT

LIMITED ACCESS STREET

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

PROJECT AREA
Clarify the multimodal access strategy at the MW-P-1 and MW-P-2 district parking structure, including whether there are transit stops, for access to the NBS Master Plan site, micromobility, and bicycle and pedestrian connections. ❶
Clarify the intersection
design and phasing at
the entrance to
Amphitheatre Parking
Garage from
Amphitheatre Parkway.
❷
Consider moving the active use parking
on Shoreline Boulevard south of
Shorebird Way to avoid Green Loop
conflicts and use right-in-right-out access.
❸
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
86 5. Traffic Forecasts
The City of Mountain View travel model was used to develop traffic forecasts for the NBS Master Plan and the project study area.

5.1 Summary of Forecasts Methods
The traffic forecasts were developed using the following steps and methods consistent with the NBPP transportation analysis completed in 2017 (refer to the technical documents referenced below for additional details on the analysis methods):
• Trip Generation: Daily and peak hour project driveway and North Bayshore Gateway volume estimates were developed using the trip generation methods from the North Bayshore Precise Plan with Residential – Project Trip Generation Estimates (February 2017) memorandum in Appendix G of the North Bayshore Precise Plan Transportation Impact Analysis (July 2017), and the North Bayshore Master Plan – Morning Peak Hour Inbound Single-Occupancy Vehicle Mode Share for Non-Residential Development in the North Bayshore District and Trip Generation Summary Tables memorandum (December 19, 2022) (Refer to Appendix E and Appendix F). The daily and peak hour project driveway trip generation is used for the project site, while the North Bayshore Gateway volume is used for the North Bayshore area.
• Service Population: The residential and employee populations were estimated using employee densities from the Mountain View travel model.

5.2 Driveway Trip Generation
This section summarizes the trip generation for the proposed land uses and those being demolished as part of the proposed project.

5.2.1 Existing NBS Master Plan Land Use and Trip Generation The existing building demolition credit trip generation is shown in Table 11. The project driveway vehicle trip generation is based on the occupied buildings described in Table 12. The existing daily and total morning and evening peak hour trip generation rates by land use are:
• Office Use: 3.00 total daily vehicle trips per employee; 0.33 AM peak hour trips per employee; and

0.33 PM peak hour vehicle trips per employee.13
• Research & Development: 2.89 total daily vehicle trips per employee; 0.28 AM peak hour trips per employee; and 0.24 PM peak hour vehicle trips per employee.14

13 Based on Google employee mode share survey (Spring 2020) and Spring 2020 North Bayshore District Transportation Monitoring and Near-Term Growth Assessment (May 2020).

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 87 • Industrial: 3.73 total daily vehicle trips per employee; 0.55 AM peak hour trips per employee; and 0.45 PM peak hour vehicle trips per employee.14
Table 11: Driveway Trip Generation for Existing Buildings to be Demolished Land Use Building Size Service
Population1
Daily
Trips1
AM Peak Hour Trip1 PM Peak Hour Trips1
In Out Total In Out Total
North Bayshore Master Plan Trips
Office 8,653
square feet 30 90 10 0 10 0 10 10
Research &
Development
1,642,061
square feet 5,720 16,510 1,330 250 1,580 280 1,120 1,400 Industrial 92,497
square feet 110 410 50 10 60 10 40 50
Public Parking at SA-P-1 240
spaces 0 440 20 20 40 20 20 40
Total 5,860 17,450 1,410 280 1,690 310 1,190 1,500
Note:

1. Service population and vehicle trips rounded to the nearest 10.

Source: Fehr & Peers, 2023.

5.2.2 Proposed NBS Master Plan Land Use and Vehicle Trip Generation The NBS Master Plan driveway trip generation is shown in Table 12. The project driveway vehicle trip generation is based on the following information:
• New Residential Development: The new residential units are assumed to be a mix of 5,600 market rate units with an average size of 1.80 persons per household and a reduced parking supply rate of

0.65 spaces per dwelling unit, and 1,400 affordable housing units with an average size of 1.90 persons per household and a parking supply rate of 0.69 spaces per dwelling unit. This results in an estimate of 10,080 residents in the market rate units, 2,660 residents in the affordable housing units, and a total of 12,740 residents for the NBS Master Plan. The proposed residential uses would have a combined effective daily trip generation rate of approximately 3.78 daily vehicle trips per dwelling unit, 0.21 AM peak hour vehicle trips per dwelling unit, and 0.30 PM peak hour vehicle trips per dwelling unit.
• New and Rebuilt Office Development: The proposed office space is assumed to be 93% occupied (based on historical vacancy rates) at a density of 4.0 employees per 1,000 square feet gross floor area. This results in an estimate of 11,700 employees on site. The daily trip generation rate for new office uses in the NBS Master Plan area is 1.40 daily vehicle trips per employee, 0.20 AM peak hour

14 Based on ITE Trip Generation Manual 11th Edition (September 2021) and Spring 2020 North Bayshore District Transportation Monitoring and Near-Term Growth Assessment (May 2020).

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
88 vehicle trips per employee, and 0.17 PM peak hour vehicle trips per employee. This new office and other non-residential land uses are committed to achieving a 35% morning peak hour inbound single-occupancy vehicle mode share at the development driveways. • New Retail and Entertainment Development: The proposed retail space is assumed to be 93% occupied at a density of 2.67 employees per 1,000 square feet gross floor area. This results in an estimate of 600 employees on site. The daily trip generation rate for new retail/entertainment uses in the NBS Master Plan is 16.3 daily vehicle trips per employee, 0.35 AM peak hour vehicle trips per employee, and 0.63 PM peak hour vehicle trips per employee. • New Hotel Development: The proposed hotel space is assumed to have an employment density of

0.4 employees per room. This results in an estimate of 210 employees on site. The daily trip generation rates for new hotel uses in the NBS Master Plan are 4.79 daily vehicle trips per room, 0.23 AM peak hour vehicle trips per room, and 0.18 PM peak hour vehicle trips per room. • New Police Operations Station Development: The proposed Police Operations Station is assumed to be 93% occupied (based on historical vacancy rates) at a density of 4.0 employees per 1,000 square feet gross floor area. This results in an estimate of 10 employees on site. The daily trip generation rate for new Police Operations Station land uses in the NBS Master Plan area is 1.40 daily vehicle trips per employee, 0.20 AM peak hour vehicle trips per employee, and 0.17 PM peak hour vehicle trips per employee.
• Public Parking at SA-P-1: The 240 public parking spaces at SA-P-1 are assumed to have a trip generation similar to Existing Conditions: 440 daily vehicle trips, 40 AM peak hour vehicle trips, and 40 PM peak hour vehicle trips.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 89 Table 12: Driveway Vehicle Trip Generation with Project Land Use Building Size Service
Population1
Daily
Trips1
AM Peak Hour Trips1 PM Peak Hour Trips1
In Out Total In Out Total
North Bayshore Master Plan
Residential – Market Rate 5,600 dwelling
units 10,080 21,560 280 900 1,180 990 690 1,680
Residential – Affordable4 1,400 dwelling
units 2,660 4,930 60 200 260 220 160 380
North Bayshore Master Plan Residential Trips
(A) 12,740 26,490 340 1,100 1,440 1,210 850 2,060
Office 3,145,897
square feet 11,700 16,360 2,070 280 2,350 330 1,700 2,030 Retail/Commercial Space 240,000 square
feet 600 9,720 130 80 210 180 190 370
Active Space Kiosks2 4,000 square feet 0 0 0 0 0 0 0 0
Hotel 525 Rooms 210 2,520 70 50 120 50 50 100
Community Uses3 55,000 square feet 0 0 0 0 0 0 0 0
Police Operations Station 2,000 square feet 10 20 0 0 0 0 0 0 Public Parking at SA-P-1 240 spaces 0 440 20 20 40 20 20 40 North Bayshore Master Plan
Non-Residential Trips (B) 12,520 29,060 2,290 430 2,720 580 1,960 2,540 North Bayshore Master Plan
Trips (A + B = C) 25,260 55,550 2,630 1,530 4,160 1,790 2,810 4,600 Existing Building Credit
Office 8,653 square feet -30 -90 -10 0 -10 0 -10 -10
Research & Development 1,642,061
square feet -5,720 -16,510 -1,330 -250 -1,580 -280 -1,120 -1,400 Industrial 92,497 square feet -110 -410 -50 -10 -60 -10 -40 -50 Public Parking at SA-P-1 240 spaces 0 -440 -20 -20 -40 -20 -20 -40 Existing Building Credit (D) -5,860 -17,450 -1,410 -280 -1,690 -310 -1,190 -1,500 Net Change
Net Increase (C + D = E) 19,400 38,100 1,220 1,250 2,470 1,480 1,620 3,100 Notes:

1. Service population and daily trips rounded to the nearest 10.

2. The 4,000 square feet of active space kiosks identified in the Greenway Park West, Greenway Park East, and The Portal is a local serving use that is assumed not to generate vehicle trips.

3. The 55,000 square feet of community uses is a local serving use that is assumed not to generate separate vehicle trips during a typical weekday, but rather attract walking and biking trips from the surrounding land uses. Weekend programming of the community uses would generate additional vehicle trips outside of the typical weekday.

4. A sensitivity test was performed with a land use plan that converted 5% inclusionary affordable housing to market rate housing. This change resulted in an increase of less than 10 peak hour vehicle trips and 100 daily vehicles trips. This change is relatively small and would not change the conclusions of the MTA analysis.

Source: Fehr & Peers, 2023.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
90 5.2.3 Person Trip Generation
Per the vision of the NBPP, the NBS Master Plan will construct a street system that supports travel by walking, bicycling, carpool, and transit. The NBS Master Plan person travel by mode for all land uses is shown in Table 13. This summary shows the majority (more than 40 percent daily and more than 50 percent during the peak hours) of the combined residential and non-residential person trips are by pedestrians, bicyclists, and transit riders. Further the single-occupancy vehicles and high-occupancy vehicles will park in six district parking garages, which then requires the ½ mile or so between the garages and the final destinations will be as a pedestrian, bicyclist, or transit trips.

Table 13: North Bayshore Master Plan Person Trip Generation by Mode of Travel – All Land Uses
Mode of Travel
Daily
Person
Trips1
AM Peak Hour Person Trips1 PM Peak Hour Person Trips1
In Out Total In Out Total
Pedestrian 19,060
(19.5%)
1,210
(19.3%)
1,360
(37.0%)
2,570
(25.9%)
1,120
(30.2%)
1,240
(19.8%)
2,360
(23.6%)
Bicycle 4,760
(4.9%)
300
(4.8%)
340
(9.2%)
640
(6.4%)
280
(7.5%)
310
(4.9%)
590
(5.9%)
Transit 15,360
(15.7%)
1,950
(31.2%)
430
(11.7%)
2,380
(23.9%)
430
(11.6%)
1,680
(26.8%)
2,110
(21.1%)
Subtotal
(Pedestrian+Bicycle+Transit)
39,180
(40.1%)
3,460
(55.3%)
2,130
(57.9%)
5,590
(56.2%)
1,830
(49.3%)
3,230
(51.5%)
5,060
(50.6%)
High-Occupancy Vehicle (HOV) 9,620
(9.9%)
540
(8.6%)
300
(8.2%)
840
(8.5%)
450
(12.1%)
610
(9.7%)
1,060
(10.6%)
Single-Occupancy Vehicle (SOV) 48,730
(50.0%)
2,260
(36.1%)
1,250
(33.9%)
3,510
(35.3%)
1,430
(38.6%)
2,430
(38.8%)
3,860
(38.8%)
Subtotal
(SOV+HOV)
58,350
(59.9%)
2,800
(44.7%)
1,550
(42.1%)
4,350
(43.8%)
1,880
(50.7%)
3,040
(48.5%)
4,920
(49.4%)
Total 97,530
(100.0%)
6,260
(100.0%)
3,680
(100.0%)
9,940
(100.0%)
3,710
(100.0%)
6,270
(100.0%)
9,980
(100.0%)
Notes:

1. Person trips rounded to the nearest 10. Each table cell expresses: person trips (mode share percentage).

Source: Fehr & Peers, 2023.

The NBS Master plan person travel by mode for residential and non-residential land uses are shown in Table 14 and Table 15, respectively. The residential person trip generation by mode of travel reflects the residential travel characteristics of the entire project, including the combined person trip generation for market rate housing and affordable housing. The residential travel characteristics account for the NBS Master Plan’s housing unit mix and parking supply. The non-residential person trip generation by mode of travel reflects the non-residential travel characteristics of the entire project. The new office and other non- Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 91 residential land uses are committed to achieving a 35% morning peak hour inbound single-occupancy vehicle mode share at the development driveways.

Table 14: North Bayshore Master Plan Person Trip Generation by Mode of Travel – Residential Land Uses
Mode of Travel
Daily
Person
Trips1
AM Peak Hour Person Trips1 PM Peak Hour Person Trips1
In Out Total In Out Total
Pedestrian 12,080
(26.1%)
240
(33.8%)
1,170
(40.6%)
1,410
(39.3%)
950
(34.5%)
440
(28.8%)
1,390
(32.5%)
Bicycle 3,010
(6.5%)
60 (8.5%)
290
(10.1%)
350
(9.7%)
240
(8.7%)
110
(7.2%)
350
(8.2%)
Transit 2,280
(4.9%)
10 (1.4%)
240
(8.3%)
250
(7.0%)
280
(10.2%)
20 (1.3%)
300
(7.0%)
Subtotal
(Pedestrian+Bicycle+Transit)
17,370
(37.5%)
310
(43.7%)
1,700
(59.0%)
2,010
(56.0%)
1,470
(53.4%)
570
(37.3%)
2,040
(47.7%)
High-Occupancy Vehicle (HOV) 4,970
(10.7%)
80 (11.3%)
240
(8.3%)
320
(8.9%)
260
(9.5%)
190
(12.4%)
450
(10.5%)
Single-Occupancy Vehicle (SOV) 23,990
(51.8%)
320
(45.0%)
940
(32.7%)
1,260
(35.1%)
1,020
(37.1%)
770
(50.3%)
1,790
(41.8%)
Subtotal
(SOV+HOV)
28,960
(62.5%)
400
(56.3%)
1,180
(41.0%)
1,580
(44.0%)
1,280
(46.6%)
960
(62.7%)
2,240
(52.3%)
Total 46,330
(100.0%)
710
(100.0%)
2,880
(100.0%)
3,590
(100.0%)
2,750
(100.0%)
1,530
(100.0%)
4,280
(100.0%)
Notes:

1. Person trips rounded to the nearest 10. Each table cell expresses: person trips (mode share percentage).

Source: Fehr & Peers, 2023.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
92 Table 15: North Bayshore Master Plan Person Trip Generation by Mode of Travel – Non- Residential Land Uses
Mode of Travel
Daily
Person
Trips1
AM Peak Hour Person Trips1 PM Peak Hour Person Trips1
In Out Total In Out Total
Pedestrian 6,980
(13.6%)
970
(17.5%)
190
(23.8%)
1,160
(18.3%)
170
(17.7%)
800
(16.9%)
970
(17.0%)
Bicycle 1,750
(3.4%)
240
(4.3%)
50 (6.3%)
290
(4.6%)
40 (4.2%)
200
(4.2%)
240
(4.2%)
Transit 13,080
(25.5%)
1,940
(35.0%)
190
(23.8%)
2,130
(33.5%)
150
(15.6%)
1,660
(35.0%)
1,810
(31.8%)
Subtotal
(Pedestrian+Bicycle+Transit)
21,810
(42.5%)
3,150
(56.8%)
430
(53.9%)
3,580
(56.4%)
360
(37.5%)
2,660
(56.1%)
3,020
(53.0%)
High-Occupancy Vehicle (HOV) 4,650
(9.1%)
460
(8.3%)
60 (7.5%)
520
(8.2%)
190
(19.8%)
420
(8.9%)
610
(10.7%)
Single-Occupancy Vehicle (SOV) 24,740
(48.4%)
1,940
(34.9%)
310
(38.6%)
2,250
(35.4%)
410
(42.7%)
1,660
(35.0%)
2,070
(36.3%)
Subtotal
(SOV+HOV)
29,390
(57.5%)
2,400
(43.2%)
370
(46.1%)
2,770
(43.6%)
600
(62.5%)
2,080
(43.9%)
2,680
(47.0%)
Total 51,200
(100.0%)
5,550
(100.0%)
800
(100.0%)
6,350
(100.0%)
960
(100.0%)
4,740
(100.0%)
5,700
(100.0%)
Notes:

1. Person trips rounded to the nearest 10. Each table cell expresses: person trips (mode share percentage).

Source: Fehr & Peers, 2023.

5.3 North Bayshore Gateway Volumes
The daily North Bayshore Gateway volumes are shown in Table 16. The North Bayshore Gateway vehicle volumes are based on the following assumptions.
• Existing Gateway Volumes: This represents existing gateway volumes calculated from the counts conducted at the North Bayshore gateways during the spring 2020 traffic monitoring (counts were collected in February 2020 prior to the COVID pandemic altering travel patterns), with an estimated 24,779 employees (assuming a ½ percent vacancy rate) and 762 residents. Expressed as a rate, this equates to a daily rate of 3.16 vehicle trips per employee, to an AM peak hour rate of 0.31 vehicle trips per employee, to a PM peak hour rate of 0.27 vehicle trips per employee. • New Project Traffic: This represents new daily and peak hour vehicle trips generated by the project. • Existing Building Demolition Credit: This represents daily and peak hour vehicle trips generated by existing buildings on the project site. These trips will be removed with the demolition of the existing buildings.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 93 • Mixed-Use Vehicle Trip Reduction: For the NBS Master Plan, the “mixed-use trip reduction share” occurs because the additional residential opportunities in North Bayshore allows some current workers to live nearby. The addition of residential infrastructure in North Bayshore creates a mode shift by allowing people who currently drive into North Bayshore to now walk, bike, or use a local shuttle. Housing increases the diversity of the land use mix and therefore reduces existing gateway vehicle trips.

• Gateway Total Volume: This is the total number of daily and peak hour vehicle trips at the gateways, combining all the factors listed above.

Table 16: North Bayshore Gateway Volume with Project
Scenario Daily Trips1
AM Peak Hour Trips1 PM Peak Hour Trips1
In Out Total In Out Total
Existing Gateway Volumes (A) 78,370 6,310 1,340 7,650 1,460 5,280 6,740 New Project Traffic (B) 94,620 4,540 2,310 6,850 2,800 4,720 7,520 Existing Building Demolition Credit (C) -20,520 -1,690 -320 -2,010 -360 -1,400 -1,760 Mixed-Use Trip Reduction (D) -24,020 -1,220 -480 -1,700 -440 -1,000 -1,440 Gateway Total Volume (A+B+C+D=E) 128,450 7,940 2,850 10,790 3,460 7,600 11,060 Net New Gateway Traffic (E-A=F) 50,080 1,630 1,510 3,140 2,000 2,320 4,320 Note:

1. Vehicle trips rounded to the nearest 10.

Source: Fehr & Peers, 2023.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
94 5.4 Service Population
Service population is the sum of the number of employees plus residents. Table 17 shows the service population for the project site, and North Bayshore area, for each project scenario.

Table 17: Service Populations
Population Type Scenario 1:

Existing Conditions3
Scenario 2:

Cumulative with Project Conditions4
Project Site
Employees1 (A) 4,070 12,520
Residents1 (B) 0 12,740
Service Population1,2 (A + B = C) 4,070 25,260
North Bayshore
Employees1 (A) 24,780 39,700
Residents1 (B) 760 17,030
Service Population1,2 (A + B = C) 25,540 56,730
Notes:

1. Rounded employees, residents, and service population to nearest 10.

2. Service population is defined as the sum of all residents and employees.

3. Scenario 1 is Existing Conditions in 2020.

4. Scenario 2 is Cumulative Conditions with NBPP Growth and the North Bayshore Master Plan Achieving a Modified Site-Specific TDM Policy Goal with a Historical Vacancy Rate and Rengstorff Connector.

Source: Fehr & Peers, 2023.

5.5 City of Mountain View Travel Model
The Mountain View travel model was used to develop the forecasts for this study. A description of the Mountain View travel model, land use inputs, transportation network inputs, and transportation demand management are discussed in the following sections.

5.5.1 City of Mountain View Travel Model Documentation
The Mountain View Travel Model was comprehensively updated in 2011 as part of continued planning efforts to address transportation infrastructure needs and to assist in the City’s North Bayshore Precise Plan. Minor updates were completed for the East Whisman Precise Plan in 2017. The intent of the City’s travel model update was to improve the accuracy of the model for local application while maintaining consistency with the structure of the Santa Clara Valley Transportation Authority (VTA)- City/County Association of Governments of San Mateo County (C/CAG) Bi-County Model (VTA Travel Model).

For the NBS Master Plan, the land use and roadway network inputs were updated in the Mountain View Travel Model to represent a base year 2020 and a future year 2030. The updates accounted for the changes in existing land uses and the NBS Master Plan roadway network and district parking locations.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 95 The City of Mountain View Travel Model is sensitive to two factors that are key elements of the NBPP with Residential:
• Land Use Characteristics
• Transportation Demand Management (TDM) Strategies
Both are important components of the NBS Master Plan, and the City of Mountain View Travel Model has been updated to more completely account for the effects of both elements on vehicle trip generation.

5.5.2 Land Use Inputs
Urban development patterns directly influence vehicle travel demand. The City of Mountain View is employing a variety of compact growth measures, plans, and techniques to encourage walking, biking, and transit use, and to reduce demand for vehicle travel, as areas of the city are redeveloped o r experience infill development.

The Mountain View Travel Model does capture the effects of land use characteristics such as density, diversity, design, and destinations in the model’s trip generation estimates. By quantifying changes in these characteristics, the model process adjusts the number of vehicle trips based on a set of elasticities (or variables) that relate changes in vehicle trips to changes in the inputs related to the built environment.

5.5.2.1 North Bayshore Area Land Use
As described as a part of the scenarios in Chapter 1, the following eight constructed or planned developments are anticipated to add vehicle trips to the North Bayshore gateway after 2020 (the year of the North Bayshore gateway counts):
• Intuit – Bayshore Parkway
• Microsoft
• Sobrato – 1255 Pear Avenue Mixed-Use Office
and Residential
• Shashi Hotel
• Charleston East
• 1100 La Avenida Affordable Housing
• Landings and Huff/Alta Garage
• Gateway Master Plan (non-Google)
The locations of these development projects are presented in Figure 6, and Table 4 in Chapter 1 presents a summary of their associated land use assumptions (which in some cases involve demolition of existing buildings as well as construction of new buildings). For reference, Figure 6 also shows the location of the remaining known and pending projects in the North Bayshore District.

Altogether, the eight developments will involve the following net increases in land use:
• 2,186,299 square feet of office, research & development, and industrial building space • 200 hotel rooms
• 99,536 square feet of restaurant, retail, and service building space Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
96 • 100,000 square feet of recreational building space • 2,098 multi-family dwelling units
Table 18 and Table 19 show the land use totals by category for each scenario: Existing Conditions (Scenario 1) and the Cumulative with Project Conditions (Cumulative Conditions with NBPP Growth and the North Bayshore Master Plan Achieving a Modified Site-Specific TDM Policy Goal with a Historical Vacancy Rate and Rengstorff Connector) (Scenario 2).

Table 18: Land Use in North Bayshore Area: Total Building Area Land Use1 Units
Scenario 1:

Existing
Conditions2
Scenario 2:

Cumulative with
Project
Conditions3
Single Family Dwelling Units 1 1
Multi-Family Dwelling Units 362 9,460
Subtotal (Residential) [A] Dwelling Units 363 9,461
Office Square Feet 878,930 6,466,146
Research & Development Square Feet 5,938,153 4,038,142
Industrial Square Feet 246,857 150,637
Subtotal (Office, R&D and Industrial) [B] Square Feet 7,063,940 10,654,925 Retail and Restaurant Square Feet 10,878 354,374
Service Commercial Square Feet 26,138 26,138
Subtotal (Retail/Commercial) [C] Square Feet 37,016 380,512 Motel Rooms 0 725
Church Building 1 1
Institutional/Recreation Trips 4,142 7,673
Subtotal (Other Uses) (Various) 4,143 8,399
Total Residential [A] Dwelling Units 363 9,461
Total Employment Uses [B+C] Square Feet 7,100,956 11,035,437 Notes:

1. Land use summarized from the City of Mountain View travel model traffic analysis zones.

2. Scenario 1 is Existing Conditions in 2020. Under Scenario 1, 2020 vacant buildings include: 91,392 s.f. of R&D buildings are vacant at the Shoreline Commons site.

3. Scenario 2 is the Cumulative with Project Condition: Cumulative Conditions with NBPP Growth and the North Bayshore Master Plan Achieving a Modified Site-Specific TDM Policy Goal with a Historical Vacancy Rate and Rengstorff Connector.

Source: City of Mountain View travel model and Fehr & Peers, 2023.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 97 Table 19: Land Use in North Bayshore Area: Total Employee and Population Estimates Land Use1 Units
Scenario 1:

Existing
Conditions2
Scenario 2:

Cumulative with
Project
Conditions3
Single Family Population 2 2
Multi-Family Population 760 17,028
Subtotal (Residential) [A] Population 762 17,030
Office Employees 3,516 25,865
Research & Development Employees 20,784 14,133
Industrial Employees 296 181
Subtotal (Office, R&D and Industrial) [B] Employees 24,596 40,179 Retail and Restaurant Employees 60 1,285
Service Commercial Employees 78 78
Subtotal (Retail/Commercial) [C] Employees 138 1,363
Motel Employees 0 290
Church Employees 10 10
Institutional/Recreation Employees 414 767
Subtotal (Other Uses) [D] Employees 424 1,067
Total Residential [A] Population 762 17,030
Total Employment Uses [B+C+D] Employees 25,158 42,609
Notes:

1. Land use summarized from the City of Mountain View travel model traffic analysis zones.

2. Scenario 1 is Existing Conditions in 2020. Under Scenario 1, 2020 vacant buildings include: 91,392 s.f. of R&D buildings are vacant at the Shoreline Commons site.

3. Scenario 2 is the Cumulative with Project Condition: Cumulative Conditions with NBPP Growth and the North Bayshore Master Plan Achieving a Modified Site-Specific TDM Policy Goal with a Historical Vacancy Rate with Rengstorff Connector.

Source: City of Mountain View travel model and Fehr & Peers, 2023.

Table 20 and Table 21 show the occupied land use totals by category, both for what exists today and for what is expected once the Near-Term Growth developments are constructed.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
98 Table 20: Land Use in North Bayshore Area: Occupied Building Area Land Use1 Units
Scenario 1:

Existing
Conditions2,3
Scenario 2:

Cumulative with
Project
Conditions4,5
Single Family Dwelling Units 1 1
Multi-Family Dwelling Units 362 9,460
Subtotal (Residential) [A] Dwelling Units 363 9,461
Office Square Feet 810,657 6,013,515
Research & Development Square Feet 5,908,463 3,755,472
Industrial Square Feet 245,623 140,092
Subtotal (Office, R&D and Industrial) [B] Square Feet 6,964,743 9,909,079 Retail and Restaurant Square Feet 10,824 329,569
Service Commercial Square Feet 26,008 24,308
Subtotal (Retail/Commercial) [C] Square Feet 36,832 353,877 Motel Rooms 0 725
Church Building 1 1
Institutional/Recreation Trips 4,142 7,673
Subtotal (Other Uses) (Various) 4,143 8,399
Total Residential [A] Dwelling Units 363 9,461
Total Employment Uses [B+C] Square Feet 7,001,575 10,262,956 Notes:

1. Land use summarized from the City of Mountain View travel model traffic analysis zones.

2. Scenario 1 is Existing Conditions in 2020. Under Scenario 1, 2020 vacant buildings include: 91,392 s.f. of R&D buildings are vacant at the Shoreline Commons site.

3. Under Scenario 1, the remainder of the office, R&D, industrial, retail, restaurant, and service commercial buildings are assumed to be “Occupied” with a ½% vacancy rate of the total existing building square footage.

4. Scenario 2 is the Cumulative with Project Condition: Cumulative Conditions with NBPP Growth and the North Bayshore Master Plan Achieving a Modified Site-Specific TDM Policy Goal with a Historical Vacancy Rate with the Rengstorff Connector.

5. “Occupied” building square footage accounts for a 7% vacancy rate off the total building square footage under Scenario 2 for the office, R&D, industrial, retail, restaurant, and service commercial buildings.

Source: City of Mountain View travel model, and Fehr & Peers, 2023.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 99 Table 21: Land Use in North Bayshore Area: Occupied Employee and Population Estimates Land Use1 Units
Scenario 1:

Existing
Conditions2,3
Scenario 2:

Cumulative
Conditions4,5
Single Family Population 2 2
Multi-Family Population 760 17,028
Subtotal (Residential) [A] Population 762 17,030
Office Employees 3,243 24,054
Research & Development Employees 20,680 13,144
Industrial Employees 295 168
Subtotal (Office, R&D and Industrial) [B] Employees 24,218 37,366 Retail and Restaurant Employees 59 1,195
Service Commercial Employees 78 73
Subtotal (Retail/Commercial) [C] Employees 137 1,268
Motel Employees 0 290
Church Employees 10 10
Institutional/Recreation Employees 414 767
Subtotal (Other Uses) [D] Employees 424 1,067
Total Residential [A] Population 762 17,030
Total Employment Uses [B+C+D] Employees 24,779 39,701
Notes:

1. Land use summarized from the City of Mountain View travel model traffic analysis zones.

2. Scenario 1 is Existing Conditions in 2020. Under Scenario 1, 2020 vacant buildings include: 91,392 s.f. of R&D buildings are vacant at the Shoreline Commons site.

3. Under Scenario 1, the remainder of the office, R&D, industrial, retail, restaurant, and service commercial buildings are assumed to be “Occupied” with a ½% vacancy rate of the total existing building square footage.

4. Scenario 2 is the Cumulative with Project Condition: Cumulative Conditions with NBPP Growth and the North Bayshore Master Plan Achieving a Modified Site-Specific TDM Policy Goal with a Historical Vacancy Rate with Rengstorff Connector.

5. “Occupied” building square footage accounts for a 7% vacancy rate off the total building square footage under Scenario 2 for the office, R&D, industrial, retail, restaurant, and service commercial buildings.

Source: City of Mountain View travel model, and Fehr & Peers, 2023.

5.5.3 Transportation Network Inputs
Fehr & Peers added detail to the Mountain View Travel Model traffic analysis zone (TAZ) structure to account for the district parking structures and project boundaries, and to account for the refined street network in the NBS Master Plan area. The NBPP land area is divided into more than 60 TAZs to add detail to the model structure and land use allocations and the NBS Master Plan is separated into its own TAZs.

The street network accommodates these TAZs, such that the model network better represents the public streets anticipated to be constructed to support the NBS Master Plan development. By refining the travel Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
100
model in this way, the model results can be used to evaluate the distribution of vehicle traffic at each gateway that is attributable to the various development areas of the NBS Master Plan.

NBS Master Plan land use was allocated to TAZs based on parking location as shown in Table 2.This allocation method ensured that vehicle traffic was distributed accurately to where the traffic occurs. This is specifically important for the district parking structures, where the vehicle traffic does not occur where the land use is physically located.

The future roadway network was developed based on planned and funded improvements identified in the financially constrained roadway improvement project list from the Valley Transportation Plan (VTP) 2040 published by the VTA (October 2014), and the City’s 2030 General Plan Circulation Chapter. This roadway network used the Future Year (2030) scenario and the regional roadway improvements within Mountain View are summarized below (with VTP 2040 project numbers in parentheses). • SR 237 HOV/express lanes: Mathilda Ave to SR 85 (H5)* • SR 85 northbound to eastbound SR 237 connector ramp and northbound SR 85 auxiliary lane including braided SR 237 eastbound off-ramp between SR 85 and Dana Street (H21)* • SR 237 westbound on-ramp at Middlefield Road (H32)*
• US 101 southbound improvements from San Antonio Road to Charleston/Rengstorff Avenue (H42)* • SR 237 eastbound auxiliary lanes: Mathilda Avenue to Fair Oaks Avenue (H47)* • Southbound US 101 auxiliary lanes between Ellis Street and SR 237 (H49)* * Denotes Congestion Management Program (CMP) facility.

The transportation improvements within North Bayshore are presented in Figure 5 and Table 4 in Chapter 1.

5.5.4 Transportation Demand Management
In addition to a land use plan, the NBPP contains several transportation policies, programs, and initiatives intended to help reduce per service population vehicle trips, strengthen Mountain View’s alternative transportation network, and encourage travelers to shift to other travel modes. This TDM requirement has been further enhanced in the NBS Master Plan to better accommodate the future growth.

Typically, travel demand models do not directly capture the effects of TDM strategies. However, daily and peak hour TDM adjustments for commute and non-commute trip purposes are applied with the Mountain View Travel Model per the methods described in the 4D Enhancement User’s Guide (Fehr & Peers, 2011).

The outcome of applying the daily and peak hour TDM adjustments and a Fratar distribution process to modify the trip generation of NBS Master Plan transportation analysis zones to generate the daily and Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 101 peak hour vehicle trips presented in Table 12 and the North Bayshore District transportation analysis zones to generate the daily and peak hour vehicle trips presented in Table 16.15

15 Fratar, T. J. Vehicular Trip Distribution by Successive Approximations. Traffic Quarterly, Vol. 8, No. 1, 1954, pp. 53–65.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
102

6. Motor Vehicle Operations Methods
This chapter describes the traffic analysis methods used for the operations analysis.

6.1 Traffic Analysis Methods
The operations of roadway facilities are described with the term level of service (LOS), a qualitative description of vehicular traffic flow based on factors such as speed, travel time, delay, and freedom to maneuver. Six levels are defined from LOS A, which reflects free-flow conditions where there is little interaction between vehicles, to LOS F, where the vehicle demand exceeds the capacity and high levels of vehicle delay result. LOS E represents “at-capacity” operations. When traffic volumes exceed the capacity at a signalized intersection, vehicles may wait through multiple signal cycles before traveling through the intersection; these operations are designated as LOS F. Examples of the various levels of service for a signalized intersection are illustrated in Figure 25.

The Synchro 11 and TRAFFIX software used to calculate delay and LOS in this analy sis are intersection- level tools. Because of this, the results do not truly represent a corridor-level analysis, but rather a series of individual intersection analyses which do not account for the effects of queuing, weaving, or transit signal priority. Appendix K includes further discussion on the considerations of isolated intersection analysis.

Analysis Methods and Thresholds

6.1.1 Signalized Intersections

6.1.1.1 Analysis Method
The method described in Chapter 19 of the Highway Capacity Manual (HCM) 6th Edition (Transportation Research Board) was used to prepare the level of service calculations for the study intersections. 16 This level of service method, which is approved by the City of Mountain View and the VTA, analyzes a signalized intersection’s operation based on average control delay per vehicle. Control delay includes the initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. The average control delay is calculated using Synchro 11 or TRAFFIX 8.0 analysis software and is correlated to a LOS designation as shown in Table 22.

16 Select locations with unique phasing conditions use in Chapter 16 of the 2000 Highway Capacity Manual (HCM) (Transportation Research Board).

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 103 Table 22: Signalized Intersection Level of Service Definitions Level of
Service Description Average Control Delay
per Vehicle (seconds)
A Operations with very low delay occurring with favorable progression and/or short cycle lengths. ≤ 10.0
B+
B
B-
Operations with low delay occurring with good progression and/or short cycle lengths.

10.1 to 12.1

12.1 to 18.0

18.0 to 20.0
C+
C
C-
Operations with average delays resulting from fair progression and/or longer cycle lengths. Individual cycle failures begin to appear.

20.1 to 23.0

23.1 to 32.0

32.0 to 35.0
D+
D
D-
Operations with longer delays due to a combination of unfavorable progression, long cycle lengths, and high volume-to-capacity (V/C) ratios. Many vehicles stop and individual cycle failures are noticeable.

35.1 to 39.0

39.1 to 51.0

51.1 to 55.0
E+
E
E-
Operations with high delay values indicating poor progression, long cycle lengths, and high V/C ratios. Individual cycle failures are frequent occurrences.

55.1 to 60.0

60.1 to 75.0

75.1 to 80.0
F Operations with delays unacceptable to most drivers occurring due to over- saturation, poor progression, or very long cycle lengths. > 80.0 Source: Traffic Level of Service Analysis Guidelines, VTA Congestion Management Program, June 2003; and Highway Capacity Manual, Transportation Research Board, 2016.

Signalized intersection operations and deficiencies are evaluated based on each jurisdiction’s minimum threshold for acceptable operations as shown in Table 23 and the deficiency thresholds identified in Section 1.5 of the report. Based on these thresholds, an intersection is deemed unacceptable when the LOS exceeds the applicable threshold. The following table shows the thresholds for acceptable operations:

Table 23: Signalized Intersection LOS Thresholds for Acceptable Operations Jurisdiction Intersection LOS Standards Citation
City of Mountain View
City of Mountain View all
intersections LOS D; except for:

Downtown Mountain View LOS E;
San Antonio Shopping Center LOS E; CMP
facilites LOS E
City of Mountain View 2030 General Plan
and Greenhouse Gas Reduction Program
EIR, page 121 (2011)
Source: Fehr & Peers, 2023.

Exhibit 10
Signalized Intersection Level of Service Examples
Figure 25
\\Fpsj03.fpainc.local\data\Projects\_SJ21_Projects\SJ21_2068_SAPP_Amendment_MTA\Graphics\ADOBE\Fig09_Signalized_LOS_Examples.ai Intersection Operation: Free Flow
Degree of Delay: Negligible Delays
LOS A
Intersection Operation: Unstable Flow
Degree of Delay: Substantial Delays Can Occur
LOS E
Intersection Operation: Stable Flow
Degree of Delay: Minimal Delays
LOS B
Intersection Operation: Less Stable Flow
Degree of Delay: Long Delays
LOS D
Intersection Operation: Unpredictable Flow/Wait Through Multiple Cycles Degree of Delay: Excessive Delays Can Occur
LOS F
Intersection Operation: Stable Flow
Degree of Delay: Moderate Delays
LOS C
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 105

6.1.2 Unsignalized Intersections
The operations of the unsignalized intersections were evaluated using the method contained in Chapter 20 and 21 of the Highway Capacity Manual (HCM) 6th Edition. LOS ratings for stop-sign-controlled intersections are based on the average control delay expressed in seconds per vehicle. At two -way or side-street-stop controlled intersections, control delay is calculated for each movement, not for the intersection as a whole. For approaches composed of a single lane, the control delay is computed as the average of all movements in that lane. Table 24 summarizes the relationship between delay and LOS for unsignalized intersections.

Table 24: Unsignalized Intersection Level of Service Definitions Level of Service Description Average Control Delay Per
Vehicle (Seconds)
A Little or no delay. ≤ 10.0
B Short traffic delay. 10.1 to 15.0
C Average traffic delays. 15.1 to 25.0
D Long traffic delays. 25.1 to 35.0
E Very long traffic delays. 35.1 to 50.0
F Extreme traffic delays with intersection capacity exceeded. > 50.0 Source: Highway Capacity Manual, Transportation Research Board, 2016.

The City does not have an adopted LOS policy for unsignalized intersections; however, the City strives to maintain LOS D, which is a LOS standard that has been used in other traffic studies within the city. For side street stop-controlled intersections, the City determines the need for improvements based on turn movement operations (such as queues overflowing the storage capacity) as well as peak hour traffic signal warrant analyses from the California Manual on Uniform Traffic Control Devices (CA MUTCD). 17 Warrant 3 – Peak hour vehicle volume
This warrant determines if the minor street traffic suffers undue delay when entering or crossing the major street for a minimum of one hour of an average day. This is based on the major street left-turn volume, the higher-volume minor-street approach volume, and calculated delay for vehicles on the higher-volume minor-street approach.

17 Signal warrant analysis is intended to examine the general correlation between the planned level of future development and the need to install new traffic signals. It estimates future development-generated traffic compared to a sub-set of the standard traffic signal warrants recommended in the 2014 California Manual on Uniform Traffic Control Devices (CA MUTCD) guidelines. While satisfying one or more of these warrants could justify the installation of a signal at an intersection, this analysis should not serve as the only basis for deciding whether and when to install a signal. To reach such a decision, the full set of warrants should be investigated by an experienced engineer based on field-measured rather than forecast traffic data and a thorough study of traffic and roadway conditions.

Furthermore, the decision to install a signal should not be based solely upon the warrants, since the installation of signals may lead to certain types of collisions.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
106

7. Cumulative Conditions
This chapter presents the effects of the proposed project on the surrounding roadway system under Cumulative with Project Conditions.

7.1 Intersection Operations Analysis
Level of service calculations were prepared using the Synchro 11 software and TRAFFIX 8.0 software to evaluate signalized intersection operations under Cumulative with Project Conditions. The intersection volumes including the Cumulative with Project volumes on Figure 26 are shown in Appendix B and results of the LOS analysis are summarized in Table 26. The corresponding LOS calculation sheets are included in Appendix B.

Level of service calculations were based on the intersection improvements shown in Table 25 under the proposed project. The source documents, with intersection improvement summary are listed in Appendix G. Table 23 summarizes planned or recently constructed intersection improvements in an approach format, based on the plans included in Appendix G. Further Operational Improvements informed by the Cumulative with Project Intersection Operations analysis are described in Section 8.3.1.

Table 25: Future Planned Improvement Assumptions
Intersection Intersection Improvements
1 San Antonio Rd /
Bayshore Pkwy No change from Existing
2 San Antonio Rd /
US 101 Northbound Ramps No change from Existing
3 Rengstorff Ave-Amphitheatre
Pkwy / Garcia Ave-Charleston
Rd
Geometric Improvements1
• Northbound: Add an additional right-turn lane.
• Eastbound: Reconfigure the shared through-right lane to a right-turn lane.
• Westbound: Add an additional left-turn lane with a 500-foot storage pocket, convert the shared through-right lane to one through lane and add a right-turn lane with a 500-foot storage pocket.

Signal Operation Improvements1
• Modify to include protected phasing and right-turn overlaps for all movements, except southbound right turn
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 107 Intersection Intersection Improvements
4 Rengstorff Ave /
US 101 Northbound Ramps
Geometric Improvements3
This list describes the planned “Rengstorff Connector” (re-alignment of the US 101 ramps and connection to Landings Drive) as it relates to the intersection of Rengstorff Ave and
US 101 Northbound Ramps:
• Northbound: Reconfigure outside through lane to a shared through- right turn lane
• Southbound: Add a left-turn lane with a 150-foot storage pocket and remove channelization of the right-turn lane
• Eastbound (now US 101 northbound on- and off-ramps): Two left-turn lanes with 275-foot storage pockets, a through lane, and a shared through-right-turn lane with a 275-foot storage pocket. • Westbound (now Landings Drive): One left-turn lane, one shared through-left-turn lane, and one shared through-right-turn lane Signal Operation Improvements
7 Convert from east-west permissive phasing to split phasing; add protected left- turn phasing for the new southbound left turn movement
5 Rengstorff Ave /
US 101 Southbound Ramps No change from Existing
6 Rengstorff Ave / Leghorn St No change from Existing
7 Landings Dr / Charleston Rd
Geometric Improvements1
• Northbound: Convert shared through-right-turn lane to a shared left- right-turn lane
• Southbound: Remove vehicular approach and adjacent departure • Eastbound: Reconfigure from left turn lane, through lane, and shared through-right turn lane to through lane and right turn lane • Westbound: Convert shared through-right-turn lane to a through lane Signal Operation Improvements1
• Convert from north-south split phasing to northbound protected left- turn phasing; add a dedicated pedestrian phase.
8 Alta Ave / Charleston Rd
Geometric Improvements1
• Eastbound: Convert shared through-right turn lane to a right-turn lane with a 65-foot storage pocket
• Westbound: Convert shared through-right lane to a right-turn lane with a 100-foot storage pocket
Signal Operation Improvements1
• Convert north-south split phasing to protected left-turn phasing; include east-west protected right-turn phasing before and after a protected pedestrian phase with the east-west through phases 9 Huff Ave / Charleston Rd
Geometric Improvements1
• Eastbound: Convert shared through-right-turn lane to a right-turn lane with a 100-foot storage pocket
• Westbound: Convert shared through-right-turn lane to a right-turn lane with a 40-foot storage pocket
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
108
Intersection Intersection Improvements
10 Joaquin Rd / Charleston Rd
Geometric Improvements1
• Eastbound: Convert shared through-right-turn lane to a right-turn lane with a 25-foot storage pocket
• Westbound: Convert shared through-right-turn lane to a right-turn lane with a 75-foot storage pocket
Signal Operation Improvements2
• Signalize intersection with protected left-turn phasing 11 Shoreline Blvd /
Charleston Rd
Geometric Improvements1
• Northbound: Add a center, reversible dedicated bus lane Signal Operation Improvements4
• Add a dedicated bus phase during the AM peak period
12 Alta Ave / Plymouth St No change from Existing
13 Huff Ave / Plymouth St No change from Existing
14 Joaquin Rd / Plymouth St
Geometric Improvements4
• Westbound: Reconfigure from shared left-through-right-turn lane to a left-turn lane and a shared through-right-turn lane
15 Shoreline Blvd /
Space Park Way
Geometric Improvements4
“Plymouth Street Realignment” with the following approach-based modifications:
• Northbound: Reconfigure from a shared through-left-turn lane and shared through-right-turn lane to two left-turn lanes, a through lane, and a shared through-right-turn lane; add a center, reversible dedicated bus lane
• Southbound: Add a center, reversible dedicated bus lane • Eastbound (now Plymouth Street): Reconfigure eastbound approach from a shared left-through-right-turn lane to a shared through-left turn-lane and a right-turn lane
• Westbound: Reconfigure westbound approach from a shared through- left-turn lane and a right-turn lane to a left-turn lane and a shared through-right-turn lane
Signal Operation Improvement4
• Signalize the intersection with north-south protected left-turn phasing and east-west split phasing
16 Shoreline Blvd / Plymouth St The “Plymouth Street Realignment” project will remove this intersection 17 Shoreline Blvd / Pear Ave
Geometric Improvements4
• Northbound: Convert shared through-left-turn lane to a second through lane, convert shared through-right-turn lane to a right-turn lane with a 300-foot storage pocket; add a center, reversible dedicated bus lane
• Southbound: Add a center, reversible dedicated bus lane • Eastbound: Reconfigure eastbound approach from a shared left- through-right-turn lane to a left-turn lane and a shared through-right- turn lane
Signal Operation Improvement4
• Convert from north-south split phasing and east-west permissive phasing to protected left turn phasing on all approaches Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 109 Intersection Intersection Improvements
18 Shoreline Boulevard /
La Avenida-US 101
Northbound Ramps
Geometric Improvements5
Re-align US 101 northbound off-ramp to intersect La Avenida Street, creating Intersection 20. Intersection 18 will include the following approach-based improvements:
• Northbound: Remove channelization of right-turn lane (previously provided access to US 101 SB on-ramp, now providing access to La Avenida Street); add a center, reversible dedicated bus lane • Southbound: Add a center, reversible dedicated bus lane • Westbound: With US 101 NB off-ramp approach re-aligned to create Intersection 20, add a second right-turn lane on La Avenida Street approach to Intersection 18
Signal Operation Improvements7
Phasing modification to remove southwest-bound (former La Avenida St, prior to re-alignment) movement phase
19 Shoreline Blvd / US 101
Southbound Ramps
Geometric Improvements6
• Northbound: Remove left-turn lane and add a third through lane with a 45-foot storage pocket; add a center, reversible dedicated bus lane • Southbound: Add a center, reversible dedicated bus lane Signal Operation Improvements6
• Remove northbound left-turn phase
20 US 101 NB Off Ramp /
La Avenida
Geometric Improvements5
New intersection, created from the re-alignment of the US 101 NB off-ramp, with the following approach-based improvements:
• Northbound: Two left-turn lanes, a bus-only left-turn lane, and two right-turn lanes
• Eastbound: One through lane
• Westbound: Two through lanes, one with an 80-foot storage pocket Signal Operation Improvement7
• Protected phasing
21 Inigo Way / La Avenida
Geometric Improvements5
• Northbound: Add new northbound approach with a shared left- through-right-turn lane
• Southbound: Convert right-turn lane to a shared through-right-turn lane
• Eastbound: Add an eastbound approach with one left-turn lane, one through lane, and a right-turn lane with a 50-foot storage pocket • Westbound: Convert shared through-right-turn lane to a shared left- through-right-turn lane
Stop Control Improvements5
• Include stop control on new northbound approach
Notes:

1. Charleston Corridor Improvements Phase 2 and 3 (95% Submittal), 2019.

2. Plans for the Improvement of Charleston Road between Huff Ave and N Shoreline Blvd (As-Builts), 2019.

3. BFK, 2021; Charleston Corridor Improvements Phase 2 and 3 (95% Submittal), 2019.

4. Plymouth Street and Space Park Way Realignment Design (65% Plans), 2021.

5. Caltrans Project 04170003391, 2020.

6. Shoreline Boulevard Bus Lane and Utility Improvements, 2020.

7. NBS Trip Cap Analysis Synchro Files, Hexagon, 2021.

Text formatted in italics denotes a consideration note, not a recommendation.

Source: City of Mountain View and Fehr & Peers, 2023
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
110

7.1.1.1 Shoreline Gateway Bus Lane Operations
As part of Priority Transportation Improvements 14 and 23 in Table 4, the Motor Vehicle Operations Analysis models a center-reversible bus lane along Shoreline Boulevard, extending from Middlefield Road to Charleston Road. Each intersection was modeled after the Priority Transportation Improvement’s plan set and associated assumptions in Appendix G. Signal phasing information for the northern extent of the improvement (Intersection 11, Shoreline Boulevard and Charleston Road) does not yet exist, thus, the signal operation assumptions noted in Appendix G were made. The southern extent of the improvement, the intersection of Shoreline Boulevard and Middlefield Road, is not a study intersection.

At the intersection of Shoreline Boulevard and Charleston Road (Int. 11), the AM peak period (northbound bus movement) egress from center-reversible lane is modeled in Synchro 11 with a dedicated bus signal phase. For the PM peak period (southbound bus movement), it is assumed that buses from each approach would enter the center-reversible lane during that approach and movements’ signal phase.

At study intersections along Shoreline Boulevard, between Charleston Road and Middlefield Road (Int. 15, Shoreline Boulevard and Space Park Way; Int. 17, Shoreline Boulevard and Pear Avenue; Int. 18, Shoreline Boulevard and La Avenida Street; and Int. 19, Shoreline Boulevard and US 101 SB on-ramps), only through bus movements are modeled, based on assumptions in Appendix G. Center-reversible bus lane egress at these intersections is not modeled and requires additional analysis using microsimulation . Signal phasing information which allows the bus full ingress and egress to and from the center lane has not been provided in the City’s Priority Transportation improvement plans. The analysis presented in this report considers only bus through-movements at those intersections. Signal phasing for the intersections of Shoreline Boulevard and Pear Avenue (Int. 17) and Shoreline Boulevard and Space Park Way (Int. 15) assume a two-barrier structure as suggested in Appendix G, from “Plymouth Street and Space Park Way Realignment Design (65% Plans)”. The phasing shown in that plan set does not include the capability for buses to turn in and out of the center bus lane, nor does it describe concurrent phasing between the northbound left and northbound through vehicle movements, which would be a desired phasing scenario with the high northbound AM volume.

7.1.2 Cumulative with Project Conditions
The results for Existing Conditions (2019) are included in Table 26 for comparison purposes, along with the projected changes in control delay between the Existing and Cumulative with Project Conditions. Level of service and queuing by approach as well as critical volumes at Gateway Intersections by movement for the AM and PM peak hours are described in Appendix H.

The following intersections, with applicable peak hour noted, exceed their applicable level of service standard under Cumulative with Project Conditions:
• Int. 2: San Antonio Rd / US 101 Northbound Ramps (AM peak hour) • Int. 3: Rengstorff Ave-Amphitheatre Pkwy / Garcia Ave-Charleston Rd (AM peak hour) • Int. 4: Rengstorff Ave / US 101 Northbound Ramps (AM and PM peak hours) Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 111 • Int. 5: Rengstorff Ave / US 101 Southbound Ramps (AM peak hour) • Int. 6: Rengstorff Ave / Leghorn St (AM and PM peak hours) • Int. 11: Shoreline Blvd / Charleston Rd (AM and PM peak hours) • Int. 13: Huff Ave / Plymouth St (AM and PM peak hours) • Int. 14: Joaquin Rd / Plymouth St (AM and PM peak hours) • Int. 15: Shoreline Blvd / Space Park Wy (AM and PM peak hours) • Int. 17: Shoreline Blvd / Pear Ave (AM and PM peak hours) • Int. 18: Shoreline Blvd / La Avenida-US 101 Northbound Ramps (AM and PM peak hours) • Int. 21: Inigo Wy / La Avenida (AM and PM peak hours)

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
112
Table 26: Existing and Cumulative with Project Intersection Levels of Service Intersection Control
Device1
LOS
Thres-
hold2
Peak
Hour3
Existing Conditions Cumulative with
Project Conditions
Delay4 LOS5 Delay4 LOS5
1 San Antonio Rd /
Bayshore Pkwy7 Signal D
AM 14.6 B 20.9 C
PM 32.5 C 34.4 C
2 San Antonio Rd / US 101
Northbound Ramps7 Signal D
AM 19.3 B >120 F
PM 10.9 B 14.1 B
3 Rengstorff Ave- Amphitheatre
Pkwy / Garcia Ave-Charleston
Rd7
Signal D
AM 36.0 D 46.8 E
PM 82.3 F 51.1 D
4 Rengstorff Ave /
US 101 Northbound Ramps7 Signal D
AM 2.6 A 112.3 F
PM 5.8 A 90.1 F
5 Rengstorff Ave /
US 101 Southbound Ramps7* Signal D
AM 68.1 E 93.6 F
PM 50.6 D 37.3 D
6 Rengstorff Ave / Leghorn St Signal D
AM 38.5 D 68.8 E
PM 27.8 C 67.3 E
7 Landings Dr / Charleston Rd5 Signal D
AM 33.8 C 20.9 C
PM 40.8 D 22.3 C
8 Alta Ave / Charleston Rd7
Signal D AM 23.3 C 33.6 C
PM 26.5 C 28.4 C
9 Huff Ave / Charleston Rd Signal D
AM 25.8 C 23.0 C
PM 40.2 D 30.5 C
10 Joaquin Rd / Charleston Rd Signal7 D
AM 11.8 B 19.0 B
PM 13.3 B 23.9 C
11 Shoreline Blvd / Charleston Rd7 Signal D
AM 50.5 D 72.0 E
PM 105.7 F 86.4 F
12 Alta Ave / Plymouth St6,7 AWSC F
AM 7.5 A 18.7 C
PM 8.4 A 25.0 C
13 Huff Ave / Plymouth St6,7 SSSC F
AM 11.0 B >120 F
PM 12.2 B >120 F
14 Joaquin Rd / Plymouth St6,7 SSSC F
AM 15.0 B >120 F
PM 20.1 C >120 F
15 Shoreline Blvd / Space Park Wy7 Signal D
AM 88.6 F >120 F
PM 23.2 C >120 F
16 Shoreline Blvd / Plymouth St Signal D
AM 15.6 B Does Not Exist Under
Cumulative Conditions PM 18.1 B
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 113 Intersection Control
Device1
LOS
Thres-
hold2
Peak
Hour3
Existing Conditions Cumulative with
Project Conditions
Delay4 LOS5 Delay4 LOS5
17 Shoreline Blvd / Pear Ave7 Signal D
AM 57.8 E >120 F
PM 33.3 C >120 F
18 Shoreline Blvd /
La Avenida-US 101 NB Ramps7 Signal D
AM 102.2 F >120 F
PM 60.5 E 91.9 F
19 Shoreline Blvd /
US 101 Southbound Ramps7 Signal D
AM 16.5 B 10.4 B
PM 13.1 B 54.5 D
20 La Avenida /
US 101 Northbound Ramps Signal D
AM
Future Intersection

27.0 C
PM 31.0 C
21 Inigo Wy / La Avenida SSSC F
AM 10.9 B >120 F
PM 13.2 B >120 F
Notes: Bold text indicates intersection operates at a deficient Level of Service compared to the applicable standard.

1. Signal refers to a signalized intersection. SSSC = Side-Street Stop Controlled intersection.

2. City of Mountain View 2030 General Plan and Greenhouse Gas Reduction Program EIR, page 121 (2011)

3. AM = morning peak hour, PM = evening peak hour.

4. Whole intersection weighted average control delay expressed in seconds per vehicle calculated using methods described in the Highway Capacity Manual, 6th Edition. For side-street stop-controlled intersections, total delay for the worst movement approach is reported.

5. LOS = Level of Service. LOS calculations conducted using the Synchro level of service analysis software package, which applies the method described in the Highway Capacity Manual, 6th Edition unless otherwise noted.

6. LOS calculation conducted using TRAFFIX software.

7. Denotes intersections in which lane configuration or signal phasing preclude application of HCM 6th Edition methodology. For these intersections, 2000 Highway Capacity Manual methodology is utilized for delay and LOS calculations. Delay calculations for intersections analyzed in the TRAFFIX software also utilize 2000 Highway Capacity Manual methodology, as this software does not support HCM 6th Edition methodology. *Int. 5 uses HCM 6th Edition in Cumulative with Project scenario only.

Source: Fehr & Peers, 2023.

Exhibit 10
Figure 26
Peak Hour Traffic Volumes, Traffic Control, Lane Configurations, and Level of Service Cumulative with Project Conditions
330 (270)
460 (60)
680 (50)
30 (20)
100 (50)
180 (380)
10 (20)
90 (410)
10 (10)
20 (10)
20 (70)
50 (370)

1. San Antonio Rd/Bayshore Pkwy
760 (230)
810 (630)
80 (390)
240 (770)
710 (150)
580 (470)

2. San Antonio Rd/US-101 Ramps
430 (210)
1,550 (480)
450 (220)
250 (80)
320 (190)
130 (470)
70 (110)
200 (1,220)
50 (60)
50 (40)
150 (220)
290 (520)

3. Amphitheatre Pkwy/Rengstorff Ave/Garcia Ave/Charleston Rd 310 (290)
1,420 (460)
410 (40)
980 (390)
370 (360)
390 (380)
170 (710)
440 (1,480)
10 (20)
30 (60)
180 (260)
230 (470)

4. Rengstorff Ave/US-101 NB Ramps/Landings Dr
60 (120)
1,160 (520)
110 (210)
270 (130)
60 (180)
60 (180)
300 (490)
330 (840)
430 (1,000)
710 (140)
60 (50)
160 (170)

5. Rengstorff Ave/US-101 SB Ramps
140 (240)
890 (570)
10 (10)
180 (180)
20 (20)
100 (280)
220 (290)
290 (870)
40 (30)
260 (100)
40 (140)
10 (10)

6. Rengstorff Ave/Leghorn St
50 (150)
50 (110)
640 (420)
160 (90)
400 (610)
60 (110)

7. Landings Dr/Charleston Rd
90 (150)
40 (20)
40 (60)
150 (60)
360 (360)
190 (120)
40 (80)
20 (60)
30 (30)
20 (20)
350 (500)
20 (20)

8. Alta Ave/Charleston Rd
Bayshore Parkway
San Antonio Road
Garcia Avenue Charleston Road
Amphitheatre ParkwayRengstorff Avenue
US-101 NB Ramps Landings Dr
Rengstorff Avenue
US-101 SB Ramps
Rengstorff Avenue
Leghorn Street
Rengstorff Avenue
Charleston Road Charleston Road
Alta Avenue
90 (150)
30 (20)
70 (70)
20 (10)
310 (350)
100 (90)
10 (50)
10 (40)
20 (70)
110 (20)
290 (340)
40 (50)

9. Huff Ave/Charleston Rd
Charleston Road
Huff Avenue
90 (140)
10 (10)
80 (60)
40 (10)
240 (370)
120 (110)
10 (10)
20 (10)
20 (10)
90 (20)
340 (260)
70 (120)

10. Joaquin Rd/Charleston Rd
Charleston Road
Joaquin Road
200 (180)
920 (230)
90 (40)
150 (70)
80 (90)
110 (280)
70 (80)
340 (1,040)
90 (190)
90 (210)
210 (140)
90 (260)

11. N Shoreline Blvd/Charleston Rd
10 (10)
10 (10)
10 (10)
100 (90)
340 (330)
10 (10)
50 (130)
10 (10)
150 (250)
190 (90)
330 (390)
10 (10)

12. Alta Ave/Plymouth St
Charleston Road
N Shoreline Boulevard
Plymouth St.

Alta Ave.

US-101 Ramps
San Antonio Road
acf
bf
ace
ad
ce
cf
af
accff
acf
acce
aaacf
ace
aace
accf
abe
ace
acf
aace
abf
ace
bf
ace
d
ag
cf
acc
ae
acf
ae
acf
ae
acf
ae
acf
ae
acf
ae
acf
d ace
ace
ace
ae
d
d
d
d
# Study Intersection
Lane Configuration
acf
Peak Hour Traffic VolumeAM (PM)
STOP
Stop Sign
Signalized
LEGEND
AM
PM
A
-
C
D
E
F
Bus Lane Configuration
acf
40 (0)

STOP STOPSTOP

STOP STOP
Exhibit 10
Figure 26
Peak Hour Traffic Volumes, Traffic Control, Lane Configurations, and Level of Service Cumulative with Project Conditions
90 (70)
440 (560)
180 (110)
()
190 (290)
380 (230)
410 (360)

13. Huff Ave/Plymouth St
200 (110)
110 (100)
70 (50)
90 (150)
310 (430)
150 (180)
130 (110)
20 (200)
170 (130)
90 (150)
470 (420)
30 (60)

14. Joaquin Rd/Plymouth St
440 (530)
1,550 (280)
150 (310)
10 (30)
150 (50)
390 (530)
30 (20)
420 (1,570)
20 (40)
40 (40)
120 (80)
260 (210)

15. Shoreline Blvd/Space Pkwy
290 (310)
2,070 (940)
120 (90)
20 (50)
40 (100)
210 (400)
20 (50)
920 (2,150)
110 (110)
90 (130)
40 (30)
110 (190)

17. Shoreline Blvd/Pear Ave
1,210 (550)
350 (310)
160 (610)
1,040 (2,150)
1,290 (800)
70 (270)
470 (940)

18. Shoreline Blvd/La Avenida St
1,180 (650)
380 (210)
460 (430)
860 (1,460)
650 (1,630)

19. Shoreline Blvd/US-101 SB Ramps
1,440 (1,110)
510 (270)
350 (310)
390 (900)

20. US101 NB Off-ramp/La Avenida St
10 (10)
10 (10)
0 (0)
360 (380)
490 (190)
10 (10)
180 (250)
0 (0)
40 (10)
50 (40)
200 (640)
20 (10)

21. Inigo Way/La Avenida St
Plymouth St.

Huff Ave.

Space Parkway
Shoreline Boulevard
Pear Avenue
Shoreline Boulevard
La Avenida Street
Shoreline Boulevard
US-101 SB Ramps
Shoreline Boulevard
La Avenida Street La Avenida Street
Inigo Way
Plymouth St.

Joaquin Rd.

STOP
STOP
STOP
b
d
e
d
d
d
ae
aace
bf
ace
ae
accf
ae
acce
ae
ccf
cccf
abff
ccc
aaff
ccf
aaff
c
cc
d
acf
ae
d
# Study Intersection
Lane Configuration
acf
Peak Hour Traffic VolumeAM (PM)
STOP
Stop Sign
Signalized
LEGEND
AM
PM
A
-
C
D
E
F
Bus Lane Configuration
acf
0 (40)
40 (0)
0 (40)
40 (0)
0 (40)
40 (0)
0 (40)
40 (0)
STOP
STOP
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 115

8. Adverse Motor Vehicle Effects and
Improvements
This chapter discusses potential project effects on the study intersections. First, the adverse effect criteria are described. Next, the adverse effects and operational improvements are presented for each transportation facility type. The operational improvements described in this chapter require further analysis to evaluate their individual feasibility and benefits.

8.1 Adverse Effect Criteria

8.1.1 Signalized Intersections
The City of Mountain View 2030 General Plan (July 2012) includes policies to develop and adopt multi- modal transportation performance measures for projects in the City of Mountain View.

POLICY MOB 8.1: Multi-modal performance measures. Develop performance measures and indicators for all modes of transportation, including performance targets that vary by street type and location.

POLICY MOB 8.2: Level of service. Ensure performance measurement criteria optimize travel by each mode.

The City of Mountain View 2030 General Plan and Greenhouse Gas Reduction Program Environmental Impact Report established the following interim level of service policy standards:

Interim level of service (LOS) standards. Until adoption of the mobility plans described in Action MOB 1.1.1 [and adoption of alternative impact thresholds in Action MOB 8.1.2], maintain the Citywide vehicle LOS standards from the 1992 General Plan, which include a target peak hour LOS policy of LOS D for all intersections and roadway segments, with the following exceptions in high- demand areas:
◦ Use LOS E for intersections and street segments within the Downtown Core and San Antonio areas where vitality, activity and multi-modal transportation use are primary goals; and ◦ Use LOS E for intersections and street segments on CMP designated roadways in Mountain View (e.g., El Camino Real, Central Expressway and San Antonio Road).

This transportation analysis follows the interim LOS standards.

Adverse effects at signalized City of Mountain View intersections are found to occur when the a ddition of project traffic causes one of the following:
• Intersection operations degrade from an acceptable level to an unacceptable level; or Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
116
• Exacerbates unacceptable operations by increasing the average critical delay by four seconds or more and increasing the critical volume-to-capacity (V/C) ratio by 0.01 or more; or • Increases the V/C ratio by 0.01 or more at an intersection with unacceptable operations when the change in critical delay is negative (i.e., decreases). This can occur if the critical moveme nts change.

8.1.2 Unsignalized Intersections
Level of service analysis at unsignalized intersections is generally used to determine the need for modifying the type of intersection control (i.e., installing an all-way stop or a traffic signal). Traffic volumes, delay, and traffic signal warrants are evaluated to determine if the analyzed future intersection control is appropriate.

Based on previous studies, adverse effects are said to occur when the addition of project traffic causes the av
erage intersection delay for an all-way stop-controlled intersection, or the worst movement/approach for a side-street stop-controlled intersection, to degrade to LOS F and the intersection satisfies the peak hour traffic signal warrant from the California Manual of Uniform Traffic Control Devices (MUTCD) (2014).18

8.1.3 Adverse Effects and Improvements
Adverse effects on intersections were evaluated under Cumulative with Project Conditions. Where adverse intersection effects are identified, physical improvements are identified that could help address the operational LOS and queuing deficiency. While many of the identified improvements do not fully address the LOS deficiency and these adverse effects would remain, they do partially improve intersection delays and/or queues. The operational improvement intersection LOS calculations are presented in Appendix B.

The identified operational improvements only address roadway modifications for vehicle operations. The identified improvements are meant to manage the vehicle queuing and lane utilization present at the North Bayshore gateways and localized congestion. Other modes of travel are studied in other sections of this report and the recommendations from those sections will need to be evaluated relative to these recommendations. Specifically, the proposed improvements could have secondary effects on pedestrian and bicycle travel, especially those that require addition of lanes and roadway widening that could be in conflict with the NBPP’s multimodal circulation goals.

Therefore, the City will need to balance the need for operational improvements with the NBPP Master Plan’s overall circulation goals and multi-modal strategies. These identified improvements also may require new property acquisition or have other impacts that may not be consistent with current City policies and improvement projects. Identification of these operational improvements should not preclude

18 The peak-hour signal warrant analysis should not serve as the only basis for deciding whether and when to install a traffic signal. To reach such a decision, the full set of warrants should be investigated based on a thorough study of traffic and roadway conditions by an experienced engineer. The decision to install a signal should not be based solely upon the warrants, since the installation of signals can lead to certain types of collisions. The responsible state or local agency should undertake regular monitoring of actual traffic conditions and accident data and timely re- evaluation of the full set of warrants in order to prioritize and program intersections for signalization.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 117 the City of Mountain View from establishing alternative policies and programs to reduce the severity of the adverse effect on these facilities. Lastly, the final improvement will require coordination among multiple stakeholders to address the practical steps of implementing physical improvements. identified improvements focus on improving the conflict points between office and residential and the gateway turn movements that most affect the gateway capacity. Many of the improvements are meant to manage the vehicle queuing and lane utilization present at the North Bayshore gateways. Cumulative with Project Conditions NBSPP growth and implementation of the proposed project under Cumulative with Project Conditions, would increase motor vehicle traffic and congestion, resulting in deficient intersection operations at the following locations:

8.1.3.1.1 San Antonio Road Gateway
• Int. 2: San Antonio Rd / US-101 Northbound Ramps (AM peak hour)

8.1.3.1.2 Rengstorff Avenue Gateway
• Int. 4: Rengstorff Ave / US 101 Northbound Ramps (AM and PM peak hour) • Int. 5: Rengstorff Ave / US 101 Southbound Ramps (AM peak hour) • Int. 6: Rengstorff Ave / Leghorn St (AM and PM peak hour)

8.1.3.1.3 Shoreline Boulevard Gateway
• Int. 11: Shoreline Blvd / Charleston Rd (AM and PM peak hour) • Int. 15: Shoreline Blvd / Space Park Wy (AM and PM peak hour) • Int. 17: Shoreline Blvd / Pear Ave (AM and PM peak hour) • Int. 18: Shoreline Blvd / La Avenida-US 101 NB Ramps (AM and PM peak hour) • Int. 21: Inigo Wy / La Avenida St (AM and PM peak hour)

8.1.3.1.4 Other North Bayshore Intersections
• Int. 13: Huff Ave / Plymouth St (AM and PM peak hour) • Int. 14: Joaquin Rd / Plymouth St (AM and PM peak hour) • Int. 21: Inigo Wy / La Avenida (AM and PM peak hour)
Table 27 shows the delay and LOS grade for each deficient intersection under Cumulative with Project Conditions, with and without operational improvements. The table also shows the percentage of NBS Master Plan traffic as a portion of total intersection entering volumes for AM and PM peak hours. These percentages will be used by the City to develop fair share contributions for intersection improvements.

Intersections at which operational improvements could benefit adjacent deficient intersection operations are included as well, despite acceptable LOS at those individual intersections, such as the intersection of Shoreline Boulevard and the US 101 Southbound Ramps (Int. 19). Additionally, some intersections that do not have LOS-related improvements under the “Operational Improvements” scenario may report a Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
118
different delay than the Cumulative with Project scenario, due to corridor-wide split and offset optimization after an adjacent intersection was altered. This includes the intersections of Charleston Road and Huff Avenue (Int. 9) and Charleston Road and Joaquin Road (Int. 10). Also included are intersections for which the 95th percentile queue lengths exceed the storage capacity during either the AM or PM peak hour – storage recommendations are provided for these conditions. The corresponding LOS calculation sheets are included in Appendix B and LOS and queue lengths by approach are included in Appendix H.

Improvements are described below and are summarized in Table 25.

Table 27: Operational Improvements and Cumulative with Project Conditions LOS Intersection Operational Improvements
Recommended for Further Study4
Peak
Hour
NBS
MP
Fair
Share
Cumulative with Project
Conditions3
Without
Operational
Improvements
With
Operational
Improvement
Delay1 LOS Delay LOS
San Antonio Road Gateway
1 San Antonio Rd /
Bayshore
Pkwy
Intersection Queuing Improvements
Geometric and turn pocket
improvements to the NB, EB, and WB
approaches
AM
PM
22%
30%

20.9 34.4
C
C

19.4 36.2
B
D
2 San Antonio Rd /
US 101
Northbound
Ramps
Intersection LOS Improvements
Lane marking improvements to NB
departure
Intersection Queuing Improvements
Turn pocket improvements to the WB
approach
AM
PM
17%
21%
123.6

14.1 F
B

37.1 14.1
D
B
Rengstorff Avenue Gateway
3 Rengstorff Ave-
Amphitheatre
Pkwy / Garcia Ave-
Charleston Rd
Intersection LOS Improvements
Geometric improvements to the NB
and EB approaches
Intersection Queuing Improvements
Turn pocket improvements to the EB
approach
AM
PM
32%
39%

46.8 51.1
D
D

43.0 44.4
D
D
4 Rengstorff Ave /
US 101
Northbound
Ramps
Intersection LOS Improvements
Geometric improvements to the NB, EB,
and WB approaches
Intersection Queuing Improvements
Turn pocket improvements to the SB,
EB, and WB approaches
AM
PM
34%
38%
112.3

90.1 F
F

37.5 58.0
D
E
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 119 Table 27: Operational Improvements and Cumulative with Project Conditions LOS Intersection Operational Improvements
Recommended for Further Study4
Peak
Hour
NBS
MP
Fair
Share
Cumulative with Project
Conditions3
Without
Operational
Improvements
With
Operational
Improvement
Delay1 LOS Delay LOS
5 Rengstorff Ave /
US 101
Southbound
Ramps
Intersection LOS Improvements
Geometric improvements to the NB
and WB approaches
Intersection Queuing Improvements
Turn pocket improvements to the EB
and WB approaches
AM
PM
24%
24%

93.6 37.3
F
D

42.6 54.1
D
D
6 Rengstorff Ave /
Leghorn St
Intersection LOS Improvements
Geometric improvements to the EB and
WB approaches
Intersection Queuing Improvements
Turn pocket improvements to the NB
and SB approaches
AM
PM
17%
16%

68.8 67.3
E
E

38.8 31.7
D
C
Shoreline Boulevard Gateway
11 Shoreline Blvd /
Charleston Rd
Intersection LOS Improvements
Geometric improvements to the SB and
EB approaches
Intersection Queuing Improvements
Turn pocket improvements to the NB,
SB, EB, and WB approaches
AM
PM
30%
39%

72.0 86.4
E
F

73.4 70.8
E
E
15 Shoreline Blvd /
Space Park Wy
Intersection LOS Improvements
Geometric improvements to the NB, SB,
and EB approaches and signal phasing
improvements, dedicated bus signal
phase
Intersection Queuing Improvements
Turn pocket improvements to the NB
approach
AM
PM
34%
39%
>120
>120
F
F
>120
118.1
F
F
17 Shoreline Blvd /
Pear Ave
Intersection LOS Improvements
Geometric improvements to the NB
and EB approaches and signal phasing
improvements, including dedicated bus
signal phase
AM
PM
33%
39%
>120
>120
F
F
100.0
9 104.5
F
F
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
120
Table 27: Operational Improvements and Cumulative with Project Conditions LOS Intersection Operational Improvements
Recommended for Further Study4
Peak
Hour
NBS
MP
Fair
Share
Cumulative with Project
Conditions3
Without
Operational
Improvements
With
Operational
Improvement
Delay1 LOS Delay LOS
18 Shoreline Blvd / La
Avenida-US 101
Northbound
Ramps
Intersection LOS Improvements
Geometric improvements to the WB
approach
AM

PM
33%
39%
>120

91.9 F
F
>120

48.1 F
D
19 Shoreline Blvd /
US 101
Southbound
Ramps
2 Intersection LOS Improvements
Geometric improvements to the SB
approach for benefit of upstream
intersections, and signal phasing
improvements for benefit of transit
operations

AM
PM
30%
30%

10.4 54.5
B
D

11.8 37.2
B
D
Other North Bayshore Intersections
7 Landings Drive /
Charleston Rd
Intersection Queuing Improvements
Turn pocket improvements to the WB
approach
AM
PM
33%
40%

20.9 22.3
C
C

20.9 22.3
C
C
8 Alta Ave /
Charleston Rd
Intersection Queuing Improvements
Turn pocket improvements to the NB
and EB approaches
AM
PM
33%
40%

33.6 28.4
C
C

33.6 28.4
C
C
9 Huff Ave /
Charleston Rd
Intersection Queuing Improvements
Turn pocket improvements to the NB
and WB approaches
AM
PM
33%
40%

23.0 30.5
C
C

23.0 30.1
C
C
10 Joaquin Rd /
Charleston Rd
Intersection Queuing Improvements
Turn pocket improvements to the NB,
EB, and WB approaches
AM
PM
33%
40%

19.0 23.9
B
C

19.2 25.2
B
C
13 Huff Ave /
Plymouth St
Intersection LOS Improvements
Geometric improvements to all
approaches and intersection
signalization
AM
PM
35%
41%
>120
>120
F
F

26.5 28.0
C
C
14 Joaquin Rd /
Plymouth St
Intersection LOS Improvements
Geometric improvements to all
approaches and intersection
signalization
AM
PM
37%
41%
>120
>120
F
F

42.8 45.3
D
D
21 Inigo Wy /
La Avenida
Intersection LOS Improvements
Geometric improvements to the NB
and EB approaches and intersection
signalization
AM
PM
37%
41%
>120
>120
F
F

26.4 57.7
C
E
Notes:

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 121

1. Both Cumulative with Project Conditions without Operation Improvements and Cumulative with Project Conditions with Operational Improvements scenarios include coordinated corridor cycle length, split, and offset optimization. For this reason, the delay value for an intersection under the Operational Improvement scenario may be different from that same intersection under the Cumulative with Project scenario, even if that particular intersection does not include delay-affecting (in isolated intersection analysis) operational improvements.

2. The Operational Improvements PM peak hour scenario for Int. 19 includes a dedicated bus signal phase for center bus lane operations. This transit improvement would degrade vehicle LOS, as some cycle time would be reallocated from vehicle phases to the bus-only phase.

3. Bold text indicates intersection operations below the applicable level of service standard.

4. Potential operational improvements may have secondary effects on pedestrian and bicycle travel and the City will need to balance the need for operational improvements with the NBPP Master Plan’s overall circulation goals before implementing any of the potential operational improvements.

Source: Fehr & Peers, 2023.

While initial feasibility, plan conflict, and right-of-way considerations are provided below, the operational improvements listed in this section will require detailed intersection designs to determine the extent of right-of-way needs, and effects on pedestrian, bicycle and transit facilities, landscaping, trees, and other design considerations. These considerations are discussed in in the italicized bullets below each improvement description. All operational improvements listed in this section should be accompanied by detailed intersection design at the individual project approval phase.

8.1.3.1.5 San Antonio Road Gateway Improvements
The identified operational improvements for the San Antonio Road Gateway listed below should be evaluated in coordination with the current VTA / Caltrans San Antonio/Rengstorff Interchange project (PA & ED Phase). The suggested improvements can be considered for potential inclusion in that PA & ED study. A recommended project (or phases) for these two interchanges will be developed through the PA & ED and will be separately funded.

Intersection 1: San Antonio Rd / Bayshore Pkwy
• Intersection LOS Improvements
◦ Add a second northbound left-turn lane on San Antonio Road ◦ Provide additional northbound right-turn lane on San Antonio Road ◦ Feasibility Considerations and Secondary Effects:
▪ Lane additions could require additional right-of-way acquisition along that approach for the desired lane width and length of the associated storage pocket and taper. Specific elements of such design should be evaluated in a future study.
▪ Operational improvements that include lane additions could result in a longer pedestrian crossing distance, removal of landscaping, or other secondary effects on active mobility or streetscape design. Such implications should be the subject of further study by the City, in which the interactions between multimodal mobility and vehicular circulation priorities are evaluated.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
122
• Intersection Queuing Improvements
◦ Extend northbound right turn lane(s) on San Antonio Road to 240 feet (NBPP SEIR Mitigation) ◦ Design additional northbound left turn lane(s) on San Antonio Road to have 200 feet of storage capacity
◦ Extend eastbound right turn lane on Bayshore Parkway to 300 feet ◦ Extend westbound left turn lane on Bayshore Parkway to 200 feet Intersection 2: San Antonio Rd / US 101 Northbound Ramps • Intersection LOS Improvements
◦ Re-stripe northbound departure to align with northbound through and inside northbound right turn lane at Intersection 1 to improve lane utilization on the northbound approach to Intersection 2
• Intersection Queuing Improvements
◦ Extend westbound left storage pocket on US 101 Ramps to 400

8.1.3.1.6 Rengstorff Avenue Gateway Improvements
The recommended operational improvements for the Rengstorff Avenue Gateway listed below should be evaluated in coordination with the current VTA / Caltrans San Antonio/Rengstorff Interchange project (PA & ED Phase). The suggested improvements can be considered for potential inclusion in that PA & ED study. A recommended project (or phases) for these two interchanges will be developed through the PA & ED and will be separately funded.

Intersection 3: Rengstorff Ave-Am phitheatre Pkwy / Garcia Ave-Charleston Rd The recommended operational improvements listed below are in addition to, or modifications of, those described in “Charleston Corridor Improvements Phase 2 and 3 (95% Submittal)”, as noted in Appendix G. • Intersection LOS Improvements
◦ Add a second eastbound left-turn pocket on Garcia Avenue ◦ Add a second northbound left-turn pocket on Rengstorff Avenue ◦ Feasibility Considerations and Secondary Effects:
▪ Lane additions could require additional right-of-way acquisition, reduction in median width, or both, along that approach for the desired lane width and length of the associated storage pocket and taper. Specific elements of such design should be evaluated in a future study. ▪ Operational improvements that include lane additions could result in a longer pedestrian crossing distance, removal of landscaping, or other secondary effects on active mobility or Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 123 streetscape design. Such implications should be the subject of further study by the City, in which the interactions between multimodal mobility and vehicular circulation priorities are evaluated. • Intersection Queuing Improvements
◦ Extend eastbound left-turn pocket(s) on Garcia Avenue to 200 feet ◦ Extend eastbound right-turn pocket on Garcia Avenue to 500 feet Intersection 4: Rengstorff Ave / US 101 Northbound Ramps The recommended operational improvements listed below are in addition to, or modifications of, tho se described in the “Priority Project Plans, BKF (July 2021)”, as noted in Appendix G. • Intersection LOS Improvements
◦ Add a second northbound through-only lane on Rengstorff Avenue (resulting in two through lanes and a shared through-right-turn lane)
◦ Add a third eastbound left-turn lane on US 101 Ramps
◦ Convert eastbound shared through-right-turn lane on US 101 Ramps to a through-only lane and add a right-turn lane with a storage length of 350 feet ◦ Add a westbound through lane on Landings Drive
◦ Feasibility Considerations and Secondary Effects:
▪ Lane additions could require additional right-of-way acquisition, reduction in median width, or both, along that approach for the desired lane width and length of the associated storage pocket and taper. Specific elements of such design should be evaluated in a future study. ▪ Operational improvements that include lane additions could result in a longer pedest rian crossing distance, removal of landscaping, or other secondary effects on active mobility or streetscape design. Such implications should be the subject of further study by the City, in which the interactions between multimodal mobility and vehicular circulation priorities are evaluated. ◦ NBPP Consistency Considerations: Adding a third eastbound left-turn lane and a second northbound through lane (in addition to a shared through-right-turn lane) would require a third receiving lane on the northbound departure of the intersection, which would result in inconsistency with the NBPP Design Standards for Gateway Boulevards. For Rengstorff Avenue, this standard states, “Up to two lanes each direction plus turn pockets”. This implication should be the subject of further study by the City, in which the interactions between Precise Plan goals, multimodal mobility, and vehicular circulation priorities are evaluated.
• Intersection Queuing Improvements
◦ Design new eastbound storage pockets on US 101 Ramps with the maximum storage length feasible, up to 350-feet, extend existing eastbound storage pockets to maximum length feasible, up to 350 feet.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
124
◦ Feasibility Considerations: As noted in Appendix H, the eastbound left-turn 95th percentile queue length in the AM peak hour is 400 feet; however, extension of the turn pocket past approximately 350 feet is prohibited by the US-101 mainline, thus no feasible improvements exist to accommodate this queue length.
◦ Extend westbound left storage pocket on Landings Drive to 350 feet ◦ Extend southbound right turn storage pocket on Rengstorff Avenue to 400 feet ◦ Feasibility Considerations: The northbound left turn 95th percentile queue length in the AM and PM peaks hours are 350 feet and 475 feet, respectively. Turn pocket extension to accommodate such queue lengths would require widening of the upstream US-101 bridge and should be considered during a capital improvement project to replace or widen this bridge.

Intersection 5: Rengstorff Ave / US 101 Southbound Ramps • Intersection LOS Improvements
◦ Convert northbound shared through-right-turn lane on Rengstorff Avenue to a through-only lane and add a right-turn pocket with a length of 100 feet
◦ Add a second westbound right-turn lane on US 101 Ramps and remove right-turn lane channelization
◦ Feasibility Considerations and Secondary Effects:
▪ Previous analyses found lane additions to the westbound approach to be physically infeasible due to grade complications. Additionally, while the median on the northbound approach and the channelized right-turn island on the westbound approach may provide space for these lane additions, provision of additional right-of-way could still be necessary. ▪ Operational improvements that include lane additions could result in a longer pedestrian crossing distance, removal of landscaping, or other secondary effects on active mobility or streetscape design. Such implications should be the subject of further study by the City, in which the interactions between multimodal mobility and vehicular circulation priorities are evaluated. • Intersection Queuing Improvements
◦ Extend westbound left storage pocket on US 101 Ramps to 375 feet ◦ Extend eastbound left storage pocket on US 101 Ramps to 375 feet ◦ Extend westbound right turn storage pocket on US 101 Ramps to 375 feet ◦ Feasibility Considerations:
▪ Exact westbound left storage pocket length should be dictated by availability of space between the intersection and the US 101 mainline, including the necessary lane taper ▪ The northbound left turn 95th percentile queue length in the AM and PM peaks hours are 100 feet and 200 feet, respectively. Extension of the turn pocket to accommodate these queue lengths is limited by the existing southbound left turn pocket at the intersection of Rengstorff Avenue and Leghorn Street (Int. 6).

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 125

Intersection 6: Rengstorff Ave / Leghorn St
• Intersection LOS Improvements
◦ Reconfigure eastbound and westbound left-turn lanes on Leghorn Street with a separate left-turn lane and one shared through-right lane with permitted phasing. (NBPP EIR Mitigation) • Intersection Queuing Improvements
◦ Extend northbound left-turn storage pocket on Rengstorff Avenue to 375 feet ◦ Extend southbound left-turn storage pocket on Rengstorff Avenue to 75 feet

8.1.3.1.7 Shoreline Boulevard Gateway Improvements
The report indicates that even with priority transportation improvements and the NBPP improvements, with the addition of the project traffic, Shoreline Boulevard will operate with deficiencies, particularly during the evening peak hour for the southbound direction. Operations on Shoreline Boulevard indicates a need to develop additional strategies to better manage peak period congestion. A Shoreline Corridor Plan should be developed to develop traffic management strategies. Those strategies, after further evaluation, can be considered for future implementation in conjunction with Master Plan development phases. Funding is needed to develop the Corridor Plan and help fund the improvement strategies.

Intersection 11: Shoreline Blvd / Charleston Rd
The recommended operational improvements listed below are in addition to, or modifications of, those described in “Charleston Corridor Improvements Phases 2 and 3 (95% Submittal)”, and the “N Shoreline Blvd BRT Lane Extension” plan set, as noted in Appendix G. • Intersection LOS Improvements
◦ Convert southbound shared through-right-turn lane on Shoreline Boulevard to a second through- only lane and add a right-turn lane with a 150-foot storage length ◦ Convert eastbound shared through-right-turn lane on Charleston Road to right-turn lane ◦ Feasibility Considerations:
▪ Though this intersection was constructed in 2021, the listed improvements could further improve vehicle operations. Lane additions could require additional right -of-way acquisition, reduction in median width, or both, along that approach for the desired lane width and length of the associated storage pocket and taper. Specific elements of such design should be evaluated in a future study.
▪ Operational improvements that include lane additions could result in a longer pedestrian crossing distance, removal of landscaping, bikeway modification, transit signal phasing operations, or other secondary effects on active mobility or streetscape design. Such implications should be the subject of further study by the City, in which the interactions between multimodal mobility and vehicular circulation priorities are evaluated.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
126

• Intersection Queuing Improvements
◦ Extend northbound-left turn pocket on Shoreline Boulevard to 450 feet ◦ Extend southbound left-turn pocket on Shoreline Boulevard to 250 feet ◦ Extend eastbound left-turn pocket on Charleston Road to 325 feet ◦ Extend westbound left-turn pocket on Charleston Road to 500 feet by restriping the existing two- way left-turn lane
Intersection 15: Shoreline Blvd / Space Park Wy
The recommended operational improvements listed below are in addition to, or modifications of, those described in “Plymouth Street and Space Park Way Realignment Design (65% Plans)”, as noted in Appendix G.
• Intersection LOS Improvements
◦ Add a dedicated bus phase for the northbound bus movement on Shoreline Boulevard during the AM peak hour and southbound bus movement during the PM peak hour ◦ Convert northbound shared through-right-turn lane on Shoreline Boulevard to a through-only lane and add a trap right-turn lane to improve northbound through movement operations at Intersection 17
◦ Add a second southbound through lane on Shoreline Boulevard ◦ Convert eastbound shared through-left-turn lane on Space Park Way to a through-only lane and add a left-turn lane
◦ Adjust signal phasing to feature:
▪ Protected east-west phasing and an eastbound right overlap phase ◦ Feasibility Considerations and Secondary Effects:
▪ Lane additions could require additional right-of-way acquisition, reduction in median width, or both, along that approach for the desired lane width and length of the associated storage pocket and taper. Specific elements of such design should be evaluated in a future study. ▪ Operational improvements that include lane additions could result in a longer pedestrian crossing distance, removal of landscaping, or other secondary effects on active mobility or streetscape design. Such implications should be the subject of further study by the City, in which the interactions between multimodal mobility and vehicular circulation priorities are evaluated. ◦ NBPP Consistency Considerations: Adding a trap northbound right-turn lane, resulting in a third northbound travel lane between Pear Avenue and Space Park Way would result in inconsistency with the NBPP Design Standards for Gateway Boulevards. For Shoreline Boulevard, this standard states, “Two lanes northbound and three southbound from Highway 101 to Plymouth, plus turn pockets.”
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 127 • Intersection Queuing Improvements
◦ Extend northbound left-turn pockets on Shoreline Boulevard to 400 feet ◦ Feasibility Considerations: The northbound left turn queue lengths in the AM and PM peak hours are 500 and 475 feet, respectively. Extension of the turn pocket past approximately 400 feet is limited by the southbound left turn pocket at the intersection of Shoreline Boulevard and Pear Avenue (Int. 17).

Intersection 17: Shoreline Blvd / Pear Ave
The recommended operational improvements listed below are in addition to, or modifications of, those described in “Plymouth Street and Space Park Way Realignment Design (65% Plans)”, as noted in Appendix G.
• Intersection LOS Improvements
◦ Add a dedicated bus phase for the northbound bus movement on Shoreline Boulevard during the AM peak hour and southbound bus movement during the PM peak hour ◦ Add a second northbound left-turn lane on Shoreline Boulevard ◦ Convert northbound right-turn lane on Shoreline Boulevard to a shared through-right-turn lane ◦ Add an eastbound trap right-turn lane on Pear Avenue
◦ Feasibility Considerations and Secondary Effects:
▪ Lane additions could require additional right-of-way acquisition, reduction in median width, or both, along that approach for the desired lane width and length of the associated storage pocket and taper. Specific elements of such design should be evaluated in a future study. ▪ Operational improvements that include lane additions could result in a longer pedestrian crossing distance, removal of landscaping, or other secondary effects on active mobility or streetscape design. Such implications should be the subject of further study by the City, in which the interactions between multimodal mobility and vehicular circulation priorities are evaluated. • Intersection Queuing Improvements
◦ Feasibility Considerations: The southbound left turn 95th percentile queue length in the AM and PM peaks hours are 225 feet and 125 feet, respectively. Extension of the turn pocket to accommodate these queue lengths is limited by the proposed northbound left turn pocket at the intersection of Shoreline Boulevard and Space Park Way (Int. 15).

Intersection 18: Shoreline Blvd / La Avenida-US
101 Northbound Ramps
The recommended operational improvements listed below are in addition to, or modifications of, those described in the “Priority Project Plans, Caltrans Project 04170003391”, as noted in Appendix G. These operational improvements should be considered as a future phase of the Shoreline / US 101 Ramp Realignment project.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
128
• Intersection LOS Improvements
◦ Add a third westbound left-turn general purpose lane on La Avenida Street ◦ Feasibility Considerations and Secondary Effects:
▪ Lane additions could require additional right-of-way acquisition, reduction in median width, or both, along that approach for the desired lane width and length of the associated storage pocket and taper. Specific elements of such design should be evaluated in a future study. ▪ Operational improvements that include lane additions could result in a longer pedestrian crossing distance, removal of landscaping, or other secondary effects on active mobility or streetscape design. Such implications should be the subject of further study by the City, in which the interactions between multimodal mobility and vehicular circulation priorities are evaluated. • Intersection Queuing Improvements:
◦ Feasibility Considerations:
▪ The westbound right turn 95th percentile queue length in the AM and PM peaks hours are 1,125 feet and 675 feet, respectively. Extension of the turn pockets to accommodate these queue lengths would extend upstream of the new intersection of La Avenida Street and the re-aligned US-101 Northbound Off-Ramp (Int. 20). Because most of the westbound right-turning traffic at Intersection 18 is from the northbound left-turn movement at Intersection 20, such a turn pocket extension would not effectively accommodate these queue lengths. ▪ The northbound right turn 95th percentile queue length in the AM peak hour is 500 feet.

Extension of the turn pocket to accommodate this queue length is limited by the upstream bridge over the US-101 mainline.

Intersection 19: Shoreline Blvd and US 101 Southbound Ramps The recommended operational improvements listed below are in addition to, or modifications of, those described in “Shoreline Boulevard Bus Lane and Utility Improvements”, as noted in Appendix G. These operational improvements should be considered as a future phase of the Shoreline / US 101 Ramp Realignment project.
• Intersection LOS Improvements
◦ Convert the outer southbound through lane on Shoreline Boulevard to a shared through-right- turn lane (channelized) to improve southbound lane utilization along Shoreline Boulevard ◦ Add a bus signal phase and bus lane egress for access to US-101 ▪ The City should further study this improvement as it relates to transit operations (including center lane ingress and egress during the peak hours) along Shoreline Boulevard ▪ Inclusion of a dedicated bus signal phase would facilitate center bus lane egress at this intersection. Without this dedicated egress phase, buses destined for the US-101 SB on- Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 129 ramps would be subject to the southbound vehicle queue along Shoreline Boulevard during the PM peak hour.
▪ This improvement would not benefit passenger vehicle operations, as the proportion of non- transit green time each cycle would be decreased to accommodate the bus phase.

Intersection Queuing Improvements
◦ The eastbound left-turn and right-turn 95th percentile queue lengths are 125 feet and 150 feet in the AM peak hour, respectively, and 150 and 375 feet in the PM peak hour, respectively. While these queue lengths exceed the storage pockets, the US-101 Southbound Off-Ramp provides sufficient storage.

Intersection 20: US 101 NB Off-Ram p and La Avenida Street The recommended operational improvements listed below are in addition to, or modifications of, those described in the “Priority Project Plans, Caltrans Project 04170003391”, as noted in Appendix G. These operational improvements should be considered as a future phase of the Shoreline / US 101 Ramp Realignment project.
• Note: As noted in Appendix G, this intersection’s Priority Improvement geometry will feature a dedicated northbound left-turn bus-only lane. To facilitate movement from this bus lane to the right- turn lanes at the eastbound approach to Shoreline Boulevard, it is recommended that a dedicated bus signal phase be implemented at Int. 20. Because this improvement would facilitate transit operations and would not improve motor vehicle operations, it is not included as an Operational Improvement.

8.1.3.1.8 Other North Bayshore Intersections
Intersection 7: Landings Dr / Charleston Rd
The recommended operational improvements listed below are in addition to, or modifications of, those described in “Charleston Corridor Improvements Phase 2 and 3 (95% Submittal)”, as noted in Appendix G. • Intersection Queuing Improvements
◦ Extend westbound left-turn pocket on Charleston Road to maximum length possible as feasible given the Permanente Creek Bridge location, up to 180 feet ◦ Feasibility Considerations:
▪ Left-turn pocket extension would require a reduction in median landscaping area. This effect should be the subject of further study by the City, in which the interactions between streetscape design and vehicular circulation priorities are evaluated.

Intersection 8: Alta Ave / Charleston Rd
The recommended operational improvements listed below are in addition to, or modifications of, those described in “Charleston Corridor Improvements Phase 2 and 3 (95% Submittal)”, as noted in Appendix G.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
130
• Intersection Queuing Improvements
◦ Extend eastbound left-turn pocket on Charleston Road to maximum length possible as feasible given the Permanente Creek Bridge location, up to 250 feet ◦ Feasibility Considerations: Left-turn pocket extension would require a reduction in median landscaping area. This effect should be the subject of further study by the City, in which the interactions between streetscape design and vehicular circulation priorities are evaluated. ◦ Extend eastbound right-turn pocket on Charleston Road to 300 feet ◦ Extend northbound left-turn pocket on Alta Avenue to 240 feet ◦ Feasibility Considerations: Extending right-turn pockets along Charleston Road would result in a decreased dedicated bus lane length. This effect should be the subject of further study by the City, in which the interactions between transit operations and vehicular circulation priorities are evaluated.

Intersection 13: Huff Ave / P
lymouth St
• Intersection LOS Improvements
◦ Reconfigure lane geometry to feature:
▪ Southbound: One left turn lane and one right turn lane ▪ Eastbound: One left turn lane and one through-only lane ▪ Westbound: One right turn lane and one through-only lane ◦ Signalize intersection with protected phasing
◦ Feasibility Considerations and Secondary Effects:
▪ Lane additions could require additional right-of-way acquisition along that approach for the desired lane width and length of the associated storage pocket and taper. Specific elements of such design should be evaluated in a future study.
▪ Operational improvements that include lane additions could result in a longer pedestrian crossing distance, removal of landscaping, or other secondary effects on active mobility or streetscape design. Such implications should be the subject of further study by the City, in which the interactions between multimodal mobility and vehicular circulation priorities are evaluated. • Intersection Queuing Improvements
◦ Turn pockets should be designed with the following storage lengths:
▪ Southbound left: 525 feet
▪ Eastbound left: 225 feet
▪ Westbound right: 500 feet
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 131 Intersection 14: Joaquin Rd / Plymouth St
The recommended operational improvements listed below are in addition to, or modifications of, those described in “Plymouth Street and Space Park Way Realignment Design (65% Plans)”, as noted in Appendix G.
• Intersection LOS Improvements
◦ Reconfigure lane geometry to feature:
▪ One left-turn lane and one shared through-right-turn lane on all approaches ◦ Signalize intersection with protected phasing
◦ Feasibility Considerations and Secondary Effects:
▪ Lane additions could require additional right-of-way acquisition along that approach for the desired lane width and length of the associated storage pocket and taper. Specific elements of such design should be evaluated in a future study.
▪ Operational improvements that include lane additions could result in a longer pedestrian crossing distance, removal of landscaping, or other secondary effects on active mobility or streetscape design. Such implications should be the subject of further study by the City, in which the interactions between multimodal mobility and vehicular circulation priorities are evaluated. • Intersection Queuing Improvements
◦ Left turn pockets should be designed with the following storage lengths ▪ Northbound: 450 feet
▪ Southbound: 425 feet
▪ Eastbound: 350 feet
▪ Westbound: 150 feet
Intersection 21: Inigo Wy / La Avenida
The recommended operational improvements listed below are in addition to, or modifications of, those described in the “Priority Project Plans, Caltrans Project 04170003391”, as noted in Appendix G. These operational improvements should be considered as a future phase of the Shoreline / US 101 Ramp Realignment project.
• Intersection LOS Improvements
◦ Add a second eastbound left-turn lane on La Avenida Street with a 100-foot storage pocket ◦ Convert the northbound shared left-through-right-turn lane on Inigo Way to a shared through- right-turn lane and add a left-turn lane
◦ Signalize the intersection with split phasing on all approaches.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
132
◦ Feasibility Considerations and Secondary Effects:
▪ Lane additions could require additional right-of-way acquisition along that approach for the desired lane width and length of the associated storage pocket and taper. Specific elements of such design should be evaluated in a future study.
▪ Operational improvements that include lane additions could result in a longer pedestrian crossing distance, removal of landscaping, or other secondary effects on active mobility or streetscape design. Such implications should be the subject of further study by the City, in which the interactions between multimodal mobility and vehicular circulation priorities are evaluated. • Intersection Queuing Improvements
◦ Feasibility Considerations: The eastbound left turn 95th percentile queue length in the PM peak hour is 300 feet. Extension of the turn pocket to accommodate this queue length is limited by the upstream intersection of La Avenida Street and the re-aligned US-101 Northbound Off-Ramp

8.2 Storage Pocket Recommendations
A standard storage pocket length analysis was completed at Charleston Road to identify recommendations for left-turn storage pocket lengths. The storage pocket evaluation considered available block length (right-turn pockets), available median space (left-turn pockets), dedicated transit lane considerations on Charleston, and peak hour 95th percentile queuing from the results of the Adverse Effects and Improvements analysis in Section 8.1.3 of this document. Left-turn storage pocket length recommendations were prepared for Charleston Road at the following intersections:
• Int. 8: Alta Ave / Charleston Rd
• Int. 9: Huff Ave / Charleston Rd
• Int. 10: Charleston Rd / Joaquin Rd
It should be noted that any additional length provided to right-turn storage pockets beyond that planned for in Charleston Corridor Improvements Phase 2 and 3 (95% Submittal) would reduce the length of the dedicated bus lane. This effect should be the subject of further discussion by the City, in which the interactions between transit operations and vehicular circulation priorities are evaluated.

All six Charleston Road approaches evaluated in this analysis are planned to feature left- and right-turn pockets and no through pockets. Therefore, the 95th percentile queues for through movements are not presented in Table 28, but are included in Appendix I. Table 28 summarizes the recommended storage pocket lengths for intersections 8, 9, and 10.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 133 Table 28: Storage Pocket Length Recommendations
Int. Major Street Minor
Street Approach Movement 95th Percentile
Queue (ft)1,2
Planned Storage
Pocket Length
(ft)2
Available
Space
(ft)3, 4, 5
Recommended
Storage Pocket
Length (ft)
8 Charleston
Road
Alta
Avenue
EB
Left 250 50 700 250
Right 300 65 500 300
WB
Left 50 180 425 180
Right 50 100 580 100
9 Charleston
Road
Huff
Avenue
EB
Left 50 120 360 120
Right 50 100 580 100
WB
Left 100 140 390 140
Right 175 40 530 175
10 Charleston
Road
Joaquin
Road
EB
Left 100 80 350 100
Right 125 25 530 125
WB
Left 150 75 290 150
Right 25 75 575 75
Notes:

1. 95th percentile queues reported are the longer of the AM and PM Peak Hour queue for that movement, rounded up to the next 25 foot increment. Full Synchro 11 queue reports are included in Appendix I.

2. Planned storage pocket lengths are drawn from Charleston Corridor Improvements Phase 2 and 3 (95% Submittal), sheets PD-9, PD-10, and PD-12. The reported length is the length of the solid white line for that pocket, rounded up to the nearest multiple of 5, as actual storage exceeds the line length.

3. Available space for right-turn pockets consider block length and left-turn pockets consider median length.

4. While right-turn pocket available space considers the entire block length to the upstream intersection, utilizing any additional available length beyond the planned pocket for vehicle storage will decrease the length of the bus-only lane.

5. Available space for left-turn pockets considers the maximum length that could be accommodated for that approach exclusively.

However, the WBL to Alta Ave and EBL to Huff Ave, the EBL to Joaquin Rd and WBL to Huff Ave, and the EBL to Shoreline Blvd and the WBL to Joaquin Rd share the same median, thus, the left-turn pocket availability for the particular approaches of each pair are inter-dependent. Block lengths are measured from the stop bar to the following upstream intersections (a point flush with the opposite direction's stop bar)
o EB at Alta Ave: Landings Dr
o WB at Alta Ave: Huff Ave
o EB at Huff Ave: Alta Ave
o WB at Huff Ave: Joaquin Rd
o EB at Joaquin Rd: Huff Ave
o WB at Joaquin Rd: Shoreline Blvd
Source: Fehr & Peers, 2023.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
134

8.3 Intersection Control Recommendations
Intersection control recommendations were prepared for all NBS Master Plan internal intersection. These recommendations evaluated useable sidewalk space, driveways, pedestrian scale lighting, street trees and landscaping, vehicular speed. Intersection control evaluation considered the following factors:
• Major and minor street volume
• 2014 California Manual on Uniform Traffic Control Devices (CA MUTCD) Peak Hour Signal Warrant criteria
• Modal priority under the NBPP
• Pedestrian and bicycle safety (crossing distance)
For internal intersections that are NBS MTA study intersections, the results of the Adverse Effects and Improvements analysis described in Section 8.1.3 of this document were considered to inform the intersection control recommendations. These intersections include Plymouth Street and Huff Avenue (Int. 13) and Plymouth Street and Joaquin Road (Int. 14).

8.3.1 Volume and Peak Hour Signal Warrant Analysis
Using roadway counts and volumes from the North Bayshore Precise Plan Transportation Impact Analysis (July 2017), the North Bayshore Circulation Study (December 2021), and Chapter 5 of this document, signal warrants for the following intersections were prepared to inform the intersection control recommendations:
• Inigo Way / Charleston Rd (new intersection)
• Manzanita St / Charleston Rd (new intersection)
• Huff Ave / Plymouth Street (Int. 13)
• Joaquin Rd / Plymouth St (Int. 14)
• Inigo Wy / Shorebird Wy (new intersection)
Signal warrant analysis is intended to examine the general correlation between the planned l evel of future development and the need to install new traffic signals. It estimates future development- generated traffic compared to a sub-set of the standard traffic signal warrants recommended in the 2014 California Manual on Uniform Traffic Control Devices (CA MUTCD) guidelines. While satisfying one or more of the warrants could justify the installation of a new signal at an intersection, the analysis does not serve as the only basis for deciding whether and when to install a signal. Ultimately, the City will determine the necessity of any new traffic signals based on warrants, other related factors, and/or an engineering study.

MTA internal intersection control evaluation utilized Warrant 3B, which considers peak hour major and minor street volumes and the number of approach lanes. The detailed signal warrant analysis, including volumes and number of approach lanes is included in Appendix J.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 135 Table 29 summarizes the recommended intersection control for the intersections of Inigo Way and Charleston Road (new intersection), Manzanita Street and Charleston Road (new intersection), Huff Avenue and Plymouth Street (Int. 13), Joaquin Road and Plymouth Street (Int. 14), and Inigo Way and Shorebird Way (new intersection). Intersection control recommendations for all internal intersections are included in Figure 27.

Table 29: Intersection Control Recommendations
Major Street Minor
Street
Peak
Hour
Traffic Volume1
Meets Peak Hour
Signal Warrant? 2
Control
Recommendation Major Street Minor Street
Charleston
Road Inigo Way
AM 329 158 No
Roundabout3
PM 553 144 No
Charleston
Road
Manzanita
Street
AM 320 Ped/Bike Only No Uncontrolled;
Enhanced
Pedestrian Crossing PM 650 Ped/Bike Only No
Plymouth
Street Huff Avenue
AM 1,320 370 Yes
Signal
PM 1,220 400 Yes
Plymouth
Street
Joaquin
Road
AM 1,080 380 Yes
Signal
PM 1,390 440 Yes
Shorebird
Way Inigo Way
AM 193 252 No
AWSC
PM 137 257 No
Notes:

1. Intersection volumes are from the following sources:
a. Charleston Rd / Inigo Way, Shorebird Wy / Inigo Wy: North Bayshore Circulation Study Google MP Demands with Rengstorff Ramp Realignment Scenario
b. Charleston Rd / Manzanita St: North Bayshore Precise Plan EIR Year 2030 Cumulative with Project Scenario c. Plymouth St / Huff Ave, Plymouth St / Joaquin Rd: NBS MTA Cumulative Conditions traffic forecasts, as described in Chapter 5 of this document

2. Peak hour warrant analysis utilized California MUTCD 2014 Section 4C.04 Warrant 3B, Peak Hour.

3. The intersection of Charleston Road and Inigo Way is proposed to be a roundabout, as noted in the North Bayshore Framework Master Plan, December 2022. Installation of a roundabout requires further evaluation and may require additional right-of-way.

Source: Fehr & Peers, 2023.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
136

8.4 Operational Improvements at Rengstorff and Shoreline Gateways
The planned North Bayshore transportation improvements are important street improvements that enhance operational conditions for vehicles, improve local circulation, and/or enhance active transportation. This section provides annotated comments on the priority transportation improvements for the following design documents along Shoreline Boulevard between US 101 and Charleston Road, and along Rengstorff Avenue between US 101 and Charleston Road. 19 Section 8.1.3 identifies operational improvements, which consist of opportunities to improve capacity - related deficient vehicular operation, including delay and queueing. Those operational improvements in Section 8.1.3 describe lane configuration, signal phasing, and storage pocket length modification considerations. Section 8.4 provides comments and recommendations which include multimodal operations, such as transit, pedestrian, and bicycle mobility safety considerations, and more detailed signage and striping opportunities than are relevant to the capacity evaluation in Section 8.1.3.

Furthermore, while the operational improvements listed in Section 8.1.3 consider addition to or modification of the following plan sets, Section 8.4 provides comments on specific design elements of those plan sets. Although related, the recommendations in Sections 8.1.3 and 8.4 provide discrete context and are not mutually-inclusive, they present various options depending on City priorities and discussion.

Additionally, some recommendations in this section could require additional right- of-way acquisition and should be the subject of further evaluation by the City for final plan design.

These recommendations review the following documents:
• Plymouth Street Realignment: Plymouth Space Park Exhibit Option – 1A (BKF, July 2020) • 100% Submittal of Shoreline Boulevard Bus Lane (Mark Thomas, August 2020) • US 101 Ramp Realignment (AECOM, August 2020)
• Charleston Corridor Improvements Phase 2 & 3 (Mark Thomas, November 2019) • Rengstorff Avenue/Landings Drive/US 101 NB Ramps (BKF, July 2021) The annotated comments for each of the priority transportation improvement design documents are consolidated in Figure 28, noted with the priority improvement plan described below. Annotated comments and recommendations for each design document are as follows:

Plymouth Street Realignment: Plymouth Space Park Exhibit Option – 1A (BKF, July 2020).

Per Figure 28, this design can be refined with the following recommendations, which should be further evaluated in future studies:

19 These designs are interim and final designs have not been refined.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 137 Signing and Striping Opportunities

1. In the near term, eliminate the merge lane on the northbound intersection departure and convert to a bus-only lane. In the long-term, convert this bus-only lane and the median to an extension of the center-reversible bus lane, eventually terminating at Charleston Road (Circulation Study ID C-10)

2. Install “Do Not Block Intersection” signage and striping to disallow blockage of the reversible bus lane entrance.

3. Should the bus lane stop at Space Park Way, the northbound buses will share the same vehicle phase as northbound through vehicles. The merge needs to be redesigned to avoid sideswipes at merge.

Lane Configuration Opportunities (also described in Section 8.1.3)

1. Convert northbound right-turn lane at Pear Avenue to a shared through-right-turn lane to increase northbound through capacity and extend north to Space Park Way, terminating as a trap right-turn lane.

2. Reconfigure eastbound approach to the intersection of Shoreline Boulevard and Space Park Way from a shared through-left turn lane and a right turn lane to a left turn lane, through lane, and right turn lane.

3. Add a second southbound and northbound through-only lane at the intersection of Shoreline Boulevard and Space Park Way.

4. Add a dedicated right turn lane to the eastbound approach to the intersection of Shoreline Boulevard and Pear Avenue.

Signal Phasing Opportunities (also described in Section 8.1.3)

1. Covert to east-west protected phasing and an eastbound right-turn overlap with the northbound left-turn phase.

Transit Operation Opportunities

1. Include a bullnose and pedestrian island (6-foot minimum) at the end of the median bus platform on the southbound approach.

2. Two separate boarding islands should be included at Space Park Way to facilitate bidirectional travel within the reversible lane.
▪ The northbound median bus boarding island would be located just north of the intersection within roadway alignment for the dual northbound left turn lanes. ▪ The southbound median bus boarding island would be located just south of the intersection.

3. Utilize the median island on the southbound departure for transit boarding and alighting.

4. Replace the existing curbside bus stop with median island at Pear Avenue.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
138
100% Submittal of Shoreline Boulevard Bus Lane (Mark Thomas, August 2020).

Per Figure 28, this design can be refined with the following recommendations, which should be further evaluated in future studies:

Lane Configuration Opportunities (also described in Section 8.1.3)

1. Convert northbound right-turn lane at Pear Avenue to a shared through-right turn lane to increase northbound through capacity and extend north to Space Park Way, terminating as a trap right-turn lane (same as comment for Plymouth Street Realignment: Plymouth Space Park Exhibit Option – 1A (BKF, July 2020)).

US 101 Ramp Realignment (AECOM, August 2020).

Per Figure 28, this design can be refined with the following recommendations, which should be further evaluated in future studies:

Transit Operation Opportunities

1. Provide bus-only phasing so that buses can turn right at Shoreline Boulevard.

Lane Configuration Opportunities (also described in Section 8.1.3)

1. Add a third westbound left turn lane to the intersection of Shoreline Boulevard and La Avenida Street.

2. Add a southbound shared through-right turn lane at the intersection of Shoreline Boulevard and US-101 Southbound Ramps.

Signing and Striping Opportunities

1. The La Avenida westbound lanes should be striped to align with the left-turn lanes at Shoreline Boulevard and not the right-turn lanes at Shoreline Boulevard.

Charleston Corridor Improvements Phase 2 & 3 (Mark Thomas, November 2019).

Per Figure 28, this design can be refined with the following recommendations, which should be further evaluated in future studies:

Signing and Striping Opportunities

1. The northbound right turns from Rengstorff Avenue to Charleston Road should include a no right-turn-on-red condition to allow for protected bicycle movements.

Storage Pocket Opportunities (also described in Section 8.1.3)

1. Consider a 500-foot storage pocket for the eastbound right-turn lane from Garcia Avenue to Rengstorff Avenue.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 139 Rengstorff Avenue/Landings Drive/US 101 NB Ramps (BKF, July 2021).

Per Figure 28, this design can be refined with the following recommendations, which should be further evaluated in future studies.

Storage Pocket Opportunities (also described in Section 8.1.3)

1. The new northbound off-ramp should consider two off-ramp lanes and include at least an equivalent amount of vehicle storage as the direct off-ramp and loop off-ramp it is replacing, with three left turn lanes, two through lanes, and a right turn lane at the intersection approach.

Lane Configuration Opportunities (also described in Section 8.1.3)

1. Add an additional westbound through lane and an additional northbound through lane.

While the NBS Master Plan provides vehicle circulation throughout the site, we recommend the NBS Master Plan:

1. Provide larger transit stops along the segment of Shoreline Boulevard south of Space Park Way to address the potential conflicts between office and residential vehicles on Shoreline Boulevard during the peak hour periods. Increase the length of the bus stop, so it does not impede vehicle traffic and provides enough space for transit riders.

2. Provide vehicle right-of-way (ROW) in the northbound direction along the segment of Shoreline Boulevard between Pear Avenue and Space Park Way to account for additional storage capacity.

This is consistent with the NBPP, which states that additional right-of-way can be provided along Shoreline Boulevard to accommodate site specific conditions. However, because the NBS Master Plan provides a general level of detail of the land use and transportation network, there may be a need to conduct additional transportation analysis during the PCP (Planned Community Permit) stage or post-construction phase and may require subsequent site specific transportation analysis to ensure that the roadway network and the project sites are designed and built to the City’s specifications. In this future phase, reference the VTA Bus Stop & Passenger Design Criteria and Guidelines for bus stop sizing.

Because the NBS Master Plan provides a general level of detail of the land use and transportation network, there will be a need to conduct additional transportation analysis during the PCP (Planned Community Permit) stage and may require subsequent site specific transportation analysis to ensure that each mode of travel and the project site are designed and built to the City’s specifications.

Exhibit 10
Intersection Control Recommendations
Figure 27
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig12-15.ai Source: North Bayshore Framework Master Plan (Plan 4.1.2 Land Use (Core Master Plan Area), December 2022)DíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒΧɓɓ Note:
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQXFWJ
LJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Plan 4.1.2 AND USE (CORE MASTER PLAN AREA)
Key
OFFICE

RESIDENTIAL

ACTIVE USES
HOTEL

FLEX - PARKING,

RESIDENTIAL

FLEX - COMMUNITY USE,

DISTRICT SYSTEMS

PARKING

DISTRICT CENTRAL PLANT

GREEN LOOP

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

LIMITED ACCESS STREET

PROJECT AREA

NBPP BOUNDARY

AREA NOT SUBJECT TO

REDEVELOPMENT

ALL-WAY

ALL-WAY

ALL-WAY

ALL-WAY

ALL-WAY

ALL-WAY

ALL-WAY

ALL-WAY
North Bayshore Precise Plan Boundary
City of Mountain View
Signalized Intersection

ALL-WAY
All-Way Stop Control
Side-Street Stop Control
Roundabout
Exhibit 10
ɓɒΧDíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒ =Dh]

Note:
8&5
&RUMNYMJFYWJ5FWPNSL,FWFLJNXFUQFSSJI
UFWPNSLLFWFLJYMFY\TZQIUWT[NIJUFWPNSLKTWZXJX
QTHFYJI\NYMNSYMJ2FXYJW5QFS&WJF9MJUFWPNSL
LFWFLJ\NQQGJUFWYTKYMJ2FXYJW5QFSѣX(*6&WJ[NJ\
GZY\NQQWJVZNWJF)JXNLS7J[NJ\5JWRNYFXNYNX
QTHFYJITZYXNIJTKYMJ3'55FWJF
9MNX5QFSNXUFWYTKYMJ3TWYM'F^XMTWJ+WFRJ\TWP
2FXYJW5QFS9MNX5QFSIJRTSXYWFYJXFHTSHJUYZFQ
UQFSKTWYMJKZYZWJIJ[JQTURJSYTKYMJ2FXYJW5QFS
&WJF7TFI\F^FQNLSRJSYXFSIQFSIZXJUFWHJQXFWJ
LJSJWFQIJUNHYNTSX9MNX2FXYJW5QFSRF^GJ
JINSWJXUTSXJYT
(NY^HTRRJSYXFXUFWYTKYMJIJXNLSWJ[NJ\
UWTHJXXFSIKZYZWJ_TSNSLUJWRNYFUUQNHFYNTSX
Plan 4.1.1 LAND USE
Key
OFFICE

RESIDENTIAL

ACTIVE USES
HOTEL

FLEX - PARKING,

RESIDENTIAL

FLEX - COMMUNITY USE,

DISTRICT SYSTEMS

PARKING

DISTRICT CENTRAL PLANT

GREEN LOOP

INDICATIVE LOCATION

OF MID-BLOCK BREAKS/

PRIVATE DRIVEWAYS

CONCEPTUAL

DEVELOPMENT BLOCKS

OPEN SPACE

LIMITED ACCESS STREET

PROJECT AREA

NBPP BOUNDARY

AREA NOT SUBJECT TO

REDEVELOPMENT

PEAR AVEPEAR AVE

PLYMOUTH

HUFF AVE
P

SHORELINE BLVD

SPACE PARK WAY

SHOREBIRD WAY

INIGO WAY

INIGO WAY

CHARLESTON RD

MONARCH ST

JOAQUIN RDJOAQUIN RD

MANZANITA ST
Plymouth Street Realignment: Plymouth Space Park Exhibit Option – 1A (BKF, July 2020) 100% Submittal of Shoreline Boulevard Bus Lane (Mark Thomas, August 20192020) US 101 Ramp Realignment (AECOM, August 2020)
Charleston Corridor Improvements Phase 2 & 3 (Mark Thomas, November 2019) Rengstorff Avenue/Landings Drive/US 101 NB Ramps (BKF, July 2021) Green Loop
Open Space
Residential
Office
Hotel
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig16_18_28.ai Figure 28
Operational Improvements at Rengstorff and Shoreline Gateways Source: North Bayshore Framework Master Plan Frame Work (March 2022)

RENGSTORFF AVE

AMPHITHEATRE

CHARLESTON RD
101
101

GARSIA AVE
W:\San Jose N Drive\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig28_Vehicular Improvements.indd • Near term: convert the merge lane to a bus-only lane / Long term: convert the bus-only lane and the median to an extension of the center-reversible bus lane, extending to Charleston Rd • Install “Do Not Block Intersection” signage at both Shoreline Blvd & Space Park Way and Shoreline Blvd & Pear Ave, and stripe to disallow blockage of the reversible bus lane entrance • Redesign the merge on NB departure from Space Park Way to avoid sidewipes if bus lane ends at Space Park Way
• Convert NBR lane to a shared thru-right-turn lane at Pear Avenue, and extend north to Space Park Way, terminating as a trap right-turn lane
• Reconfigure EB approach to the intersection of Shoreline Blvd & Space Park Way to a left turn lane, through lane, and right turn lane
• Add a second SB and NB thru lane at Shoreline Blvd & Space Park Way • Add a right turn lane to the EB approach at Shoreline Blvd & Pear Ave • Convert to E-W protected phasing and an EBR overlap with the NB left-turn phase • Include a bullnose and pedestrian island (6-foot minimum) at the SB approach to Pear Ave Plymouth Street Realignment: Plymouth Space Park Exhibition Option (July 2020) • Dedicated phasing for the bus only lane that buses can turn right at Shoreline Blvd • Add a third WBL lane to the intersection of Shoreline Blvd & La Avenida St • Re-stripe La Avenida WB lanes to align with the left turn lanes at Shoreline Blvd • Separate EBR lane at Inigo Way & La Avenida St not needed • Add a SB shared thru right turn lane at Shoreline Blvd & US-101 SB ramps US 101 Ramp Realignment (August 2020)
• Consider two off-ramp lanes, three left turn lanes, two thru lanes, and a right turn lane at the new NB off-ramp
• Add an additional WBT lane and additional NBT lane
Rengstorff Avenue/Landings Drive/US 101 NB Ramps (July 2021) • Convert NBR lane to a shared thru-right-turn lane at
Pear Ave to a shared thru right turn lane
• Extend north to Space Park Way, terminating as a trap right-turn lane
100% Submittal of Shoreline Boulevard Bus Lane
(August 2019)
• Include a no right-turn-on-red condition to the NBR from Rengstorff Ave to Charleston Rd • Consider a 500-foot storage pocket for the EBR lane from Garcia Ave to Rengstorff Ave Charleston Corridor Improvements Phase 2 & 3 (November 2019) Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
142

9. Traffic Calming
The NBS Master Plan will develop a dense and flexible street grid that allows for safe travel for all modes through the site. The new street grid will include new or retrofitted complete streets, pedestrian pathways, and multi-use trails integrated with the existing street network.

To enhance mobility and walkability within the NBS Master Plan site, a series of new complete streets designed with a multi-modal focus will be added to the existing street grid. The new complete streets include access streets, neighborhood streets, and service streets. They will serve adjacent lands uses and include traffic calming features identified in the NBPP as summarized below:
• Access streets, which will serve most of the driveways and parking entrances in the NBS Master Plan area, deliver auto traffic from gateway boulevards to various parking lots near office, retail, and residential buildings. Traffic calming features on new access streets include low design speeds, between 15 and 25 mph, minimum 5’ sidewalk with 5’ landscape buffer, and minimum 6’ bike lane with 3’ buffer. Figure 29 shows a cross-section of Plymouth Street west of Huff Avenue. The characteristics of the cross-section align with the NBPP design standards for access streets. • Neighborhood streets are streets at the front door of office, retail, and residential buildings, in addition to on-site parking lots that provide access to and from Shoreline Boulevard. Traffic calming features on new neighborhood streets include minimum 6’ bike lane and 3’ buffer.

Figure 30 shows a cross-section of Joaquin Street. The characteristics of the cross-section align with the NBPP design standards for neighborhood streets.
• Access Streets are residential or service-oriented streets with spaces for emergency vehicle access, loading, delivery, and pick-up. Traffic calming features on new service streets include a low design speed of 15 mph and raised crosswalk at the intersections between pedestrian passageways and shared travel lanes.

In addition to adding new streets, the NBS Master Plan will retrofit several existing streets to increase the visibility of pedestrians and bicyclist, shorten crossing distances for pedestrians and bicyclist, and/or slow the speed of vehicles at mid-block and at intersections using traffic calming treatments, such as curb extensions, raised crosswalks or protected intersections, roundabouts, and tighter curb returns. Shorebird Way will be converted from a two-way street into a one-way eastbound street to limit vehicle volume. A segment of the Shorebird Way right-of-way will be closed seasonally to limit volumes and provide space for native plants and wildlife.

The NBS Master Plan adds new pedestrian pathways, bicycle paths, and multi-use trails in the new grid system to provide pedestrian and bicycle connections between streets and active use areas that generate ground-floor activities. This includes the Green Loop that provides pedestrian and bicycle connections within the NBS Master Plan area as well as the nearby trails and parks, the Social Spine that provide s space for active uses and pedestrian connections within Shorebird, and a network of new off- street paths.

While there is congestion at the gateways in North Bayshore, there is a low likelihood for cut-through Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 143 traffic in the NBS District. The City's Neighborhood Traffic Management Program (NTMP) guidelines set guidelines to establish if the amount of cut-through traffic exceeds the NTMP criteria.

9.1 Adverse Effect Evaluation
As shown in Table 5 and listed below, there are three adverse effects criteria for the traffic calming and neighborhood intrusion evaluation:
• Criterion #7: A project meets the threshold set by the City’s adopted Neighborhood Traffic Management Program (NTMP).
• Criterion #8: Traffic calming devices or other traffic control is identified in an adopted plan. • Criterion #9: In conformance with the City’s Vision Zero Policy, projects proactively implement traffic calming devices to meet the City’s multi-modal and safety goals.

Criterion 7 considers a project to have an adverse effect if it meets the threshold set by the City’s adopted NTMP, which is “[a]n increase of up to 25% of existing vehicles or 500 vehicles per day, whichever is less, would trigger an automatic analysis of that street.” This project generates more than 500 vehicle trips per day, but this is a much larger area than the guidance and the local streets within the project area are anticipated to serve low volume local traffic. The project is not applicable to this criterion.

Criterion 8 considers a project to have an adverse effect if traffic calming devices or other traffic control is identified in an adopted plan. While the project describes proposed improvements to enhance pedestrian and bicycle mobility, traffic control devices are recommended in the Motor Vehicle Operations section.

The project is not considered to have an adverse effect based on criterion 8.

Criterion 9 requires a project to conform with the City of Mountain View’s Vision Zero Policy (codified in Council Policy K-24 and dated December 10, 2019) by proactively implementing traffic calming devices to meet the City’s multi-modal and safety goals. As mentioned previously, the project proposes to design streets with traffic calming features built in; as a result, the project is not considered to have an adverse effect based on criterion 9.

The NBS Master Plan provides a general level of detail of the land use and transportation network; thus, there may be a need to conduct additional transportation analysis during the PCP (Planned Community Permit) stage or post-construction phase and may require subsequent site specific transportation analysis to ensure that the roadway network and the project sites are designed and built to the City’s specifications.

Exhibit 10
Cross-section of Plymouth Street
Figure 29
N:\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig.ai Source: North Bayshore Framework Master Plan (Figure 6.1.13 Plymouth Street Section, September 2022)84 | North Bayshore Framework Master Plan - September 2022

RESPONSE TO WRITTEN COMMENTS
Figure 6.1.13 PL YMOUTH STREET SECTION
Exhibit 10
Cross-section of Joaquin Street
Figure 30
W:\San Jose N Drive\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\ADOBE\03_MTA\Fig29_30_CrossSections.ai Source: North Bayshore Framework Master Plan (Figure 6.1.7 Joaquin Street (North of Monarch), December 2022)DíüćÎ¥ĞĀÎíü½&ü¥æ½ĘíüÞC¥Āć½üVá¥ç̀½³½æ²½üɒɐɒɒΧɘə Figure 6.1.7 JOAQUIN STREET (NORTH OF MONARCH)
,WJJS
'ZKKJW
,WJJS
'ZKKJW
'NPJ
1FSJ
'NPJ
1FSJ
(ZWGXNIJ
?TSJ
(ZWGXNIJ
?TSJ
8NIJ\FQP8NIJ\FQP
PL PL
8JYGFHP
8JYGFHP
WEST
HJ
7JXNIJSYNFQ
'ZNQIFGQJ&WJF
EAST
HJ
7JXNIJSYNFQ
'ZNQIFGQJ&WJF

JOAQUIN
ROAD
*]NXYNSL9WJJX
Note:
+ZYZWJIJXNLSTKXNIJ\FQPXFSIGNPJQFSJTS
JFXYXNIJTKXYWJJYYTUWNTWNYN_JYMJWJYFNSNSLTK
J]NXYNSLYWJJX\MJWJKJFXNGQJ+NSFQQTHFYNTS
TKUJIJXYWNFS_TSJYTGJIJYJWRNSJI
'NTWJYJSYNTS\NQQGJWJVZNWJIKTWXYTWR\FYJW
YWJFYRJSY9MJXJKFHNQNYNJXRF^FQYJWSFYJ\NYM
YWJJXFSITYMJWLWJJSGZKKJWJQJRJSYX
<MJWJFUUWTUWNFYJHZWGXNIJ_TSJXHFSFQXT
GJZYNQN_JIKTWXYTWR\FYJWRFSFLJRJSYFSI
GNTWJYJSYNTSFX\JQQFXUQFSYJWXKTWJ]NXYNSL
YWJJWJYJSYNTS
349*,WFINSLYTGJIJYJWRNSJIFYFQFYJWXYFLJ
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
146

10. Pedestrian Operations
The pedestrian operations analysis presented in this chapter references existing pedestrian facilities and environment; summarizes the primary walking routes between residential, office, retail, and public uses in the NBS Master Plan; evaluates the Pedestrian Quality of Service (PQOS) within one-half-mile of the pedestrian study area; and identifies potential pedestrian-oriented improvements.

10.1 Existing Conditions
As described in the Existing Condition section, most streets in the pedestrian areas include at least a four- foot-wide sidewalk. Meandering sidewalks buffered from the roadway by landscaping exist along the gateway boulevards: Amphitheatre Parkway, North Shoreline Boulevard, and Charleston Road. Existing multi-use pathways within or near the pedestrian study area include Stevens Creek Trail, Permanente Trail, and the Green Loop. There are a few sidewalk gaps within the NBS Master Plan area, including along Pear Avenue west of Shoreline Boulevard, Shorebird Way south of Charleston Road, Stierlin Court, and Crittenden Lane, as shown on Figure 7.

10.1.1 Existing Conditions Pedestrian Quality of Service Pedestrian Quality of Service (PQOS) is rated from 1 to 5, with 1 being the best quality and 5 the lowest.

AccessMV provides PQOS maps and methodology that use a combination of WalkScore, Missing Sidewalks, Posted Speed Limits, and Road Type to determine pedestrian quality. This assessment focuses on key factors affecting walkability including the presence or absence of continuous sidewalks. Based on the PQOS evaluation from AccessMV, the existing quality of service for the NBS Master Plan site ranges between a PQOS 4 and PQOS 5 (refer to the Pedestrian Quality of Service on Figure 31 from AccessMV).

These results are shown in Table 31 for the NBS Master Plan area and the NBPP boundary. Table 30 defines the Pedestrian Quality of Service methodology from AccessMV.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 147 Table 30: Pedestrian Quality of Service Criteria
Criterion Description
WalkScore
WalkScore data identifies whether a location has nearby amenities, a high density of intersections, and short block lengths, which indicate it is comfortable for pedestrians. Streets with high WalkScores were given initial high PQOS scores as part of this analysis.

Missing Sidewalk PQOS scores were increased by 1 for any street without sidewalks on both sides, indicating a worse quality of service for pedestrians.

Posted Speed Limit
Speed limit data impacts QOS scores by modeling the detrimental impact that high-speed traffic has on pedestrian comfort. Posted speed limits <30 MPH have no impact on QOS; speed limits between 30-34 MPH increase QOS scores by 1; speed limits above 35 MPH increase QOS scores by 2.

Road Type Divided roads with more than 4 motor vehicle travel lanes and undivided roadways with more than 3 motor vehicle lanes increase PQOS scores by 1.

Source: AccessMV, 2022.

10.2 Project Conditions
The proposed plan encourages pedestrian mobility through new streets and mid-block connections, which will enhance the pedestrian experience by reducing the scale of the urban grid to create a dense and flexible network and providing safe and direct pedestrian connections to neighborhood services, places of work, residences, amenities, parks and open space, and transit facilities. Sidewalks and paths will be interconnected, which offers direct routes and paths. The proposed Green Loop, a 1.7 mile, 12 -foot- wide multi-use trail network, will be a vital component of a bicycle- and pedestrian-friendly North Bayshore. The Social Spine in Shorebird creates a pedestrian-only route through the site.

Within the pedestrian study area, a portion of Charleston Road and Shoreline Boulevard is defined by the NBPP as a transit boulevard, which prioritizes transit and shuttles over other modes of transportation.

Walking paths and distances to the transit stops on Charleston Road and Shoreline Boulevard are summarized below:
• The primary walking paths to the transit stop on Charleston Road west of Shoreline Boulevard include the sidewalks along Joaquin Road, Shoreline Boulevard, and Charleston Road. The stop is within a 5- minute walk from Charleston East and Charleston Parks and a 10-minute walk from most of the office buildings in the Joaquin North neighborhood.
• The primary walking paths to the transit stop on Charleston Road east of Shoreline Boulevard include the sidewalks along Shoreline Boulevard and Charleston Road and the pedestrian pathway along the Social Spine. The stop is within a 5-minute walk from majority of the office developments within the Shorebird neighborhood.
• The primary walking paths to the transit stop on Shoreline Boulevard include sidewalks along Shoreline Boulevard and the portion of the Green Loop south of Charleston Road. The stop is within a 15-minute walk from majority of office developments in the NBS Master Plan area.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
148
The Amphitheatre (SA-P-1) district parking north of Charleston Road and east of Shoreline Boulevard is the primary office parking location within the NBS Master Plan area. Marine Way (MW-P-1 & MW-P-2) would serve some office, but with a multi-modal center, employees and visitors would reach the NBS Master Plan core most likely by transit or bicycle. Primary walking paths for office workers traveling to the district parking location include Shoreline Boulevard, Inigo Way, Charleston Road, and the Green Loop.

The district parking is within a 5-minute walk from Charleston East and a 15-minute walk from the majority of the office buildings within Shorebird and Joaquin North. Figure 32 shows destinations within a 5-minute walk of the NBS Master Plan’s geographic center.

The majority of the ground-floor activities within the pedestrian study area are generated at the frontage of active use area along Shorebird Way, Monarch Street, and the Social Spine. Pedestrian facilities are provided for pedestrians traveling from office and residential buildings to active use areas.

10.2.1 Project Conditions Pedestrian Quality of Service This assessment focuses on key factors affecting walkability including the presence or absence of continuous sidewalks. The proposed NBS Master Plan will be enhancing the pedestrian conditions by adding sidewalks, installing protected intersection improvements, off-street paths, the Social Spine, and the Green Loop for pedestrians. The number of street miles increases from 2 to 4.5 due to the new streets and greenways with the NBPP. The increase was calculated based on the new street and greenway additions with the addition of the North Bayshore area. This analysis was assumed based on the previous analysis by AccessMV, which use a combination of WalkScore, Missing Sidewalks, Posted Speed Limits, and Road Type to determine pedestrian quality. The addition of low stress pedestrian network components improves the overall quality of the NBPP streets in line with City of Mountain View’s Complete Streets policies. The enhanced street grid creates smaller blocks, improving the directness of walking between origins and destinations within the NBPP area for all ages and abilities, including seniors and school-aged children. The pedestrian facilities within the NBS Master Plan site are consistent with the goals and policies outlined in the NBPP, and the quality of service will be improved once these are constructed; therefore, the results outlined in Table 31 show PQOS increase from 4 and 5 (worst) to 1 (best) for the NBS Master Plan area and NBS boundary.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 149 Table 31: Existing and Project Conditions Pedestrian Quality of Service Existing
Conditions
Project
Conditions
Combined QOS Score
NBS Master Plan Area NBS Boundary NBS Master Plan Area NBS Boundary QOS
Rating Street (Miles) % Street
(Miles)
Street
(Miles)
% Street
(Miles) Street (Miles) % Street
(Miles)
Street
(Miles)
% Street
(Miles)
1 (Best) 0 0 0 0 4.5 100% 21 100%
2 0 0 0 0 0 0 0 0
3 0 0 0 0 0 0 0 0
4 1 50% 6 38% 0 0 0 0
5 (Worst) 1 50% 10 62% 0 0 0 0
Total 2 100% 16 100% 4.5 100% 21 100%
Source: AccessMV, 2021 and Fehr & Peers, 2023.

10.3 Pedestrian Volumes
The proposed plan encourages pedestrian mobility through new streets and mid-block connections, which will enhance the walkability. The new urban grid will create a dense and flexible network and provide safe and direct pedestrian connections to neighborhood services, places of work, residences, amenities, parks and open space, and transit facilities. With the new, more walkable network, certain streets will be faced with higher pedestrian volumes and should be considered as candidates for pedestrian traffic control devices. As described in the traffic forecast section, the project is expected to generate approximately 2,500 pedestrian trips in each peak hour, in addition to pedestrian travel that will occur to/from the district garages and transit stops. Charleston Road and Shoreline Boulevard are expected to be the roads with the highest pedestrian volumes due to proximity to project land uses, district garages, and transit stops. Appendix B includes projected pedestrian volumes for future intersections. The following intersections are expected to experience the largest amount of pedestrian volume (approximately 500 pedestrians per peak hour):
• Alta Avenue and Charleston Road
• Huff Avenue and Charleston Road
• Joaquin Road and Charleston Road
• Shoreline Boulevard and Charleston Road
• Shoreline Boulevard and Space Park Way
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
150
Recommendations for these intersections would be increasing the sidewalk width to accommodate for these higher volumes, adding pedestrian signals, mid-block pedestrian Rectangular RRFBs, high visibility crosswalks, installation of counters to detect pedestrians and bicyclist movements and volumes, leading pedestrian intervals, daylighting crosswalks, protected intersections, no right on red, lower speed limits, raised crosswalks, or considering bulbouts.

10.4 Adverse Effects Evaluation
As shown in Table 5 and listed below, there are four adverse effect criteria for the pedestrian operations evaluation:
• Criterion #10: The project fails to provide accessible and safe pedestrian connections between buildings and adjacent streets and transit facilities.
• Criterion #11: A project disrupts existing or planned pedestrian facilities or conflicts with adopted City non-auto plans, guidelines, policies, or standards.
• Criterion #12: The project adds trips to an existing transportation facility (e.g., sidewalk) that does not meet current design standards.
• Criterion #13: The project increases vehicle trips to a roadway with a Pedestrian Quality of Ser vice (PQOS) score of 3 or more.

Criterion 10 states that a project is considered deficient if it fails to provide accessible and safe pedestrian connections between buildings and adjacent streets and transit facilities. The project proposes new streets, mid-block connections, sidewalks and paths, proposed Green Loop, and a Social Spine at Shorebird. A proposed Pedestrian Priority Zone along Grove Street can serve as an alternative path to Charleston Road and Shoreline Boulevard. The project also proposes a Green Loop, which is a two-way cycle track and pedestrian path, which circulates throughout the site and connects to Permanente Creek Trail. We are assuming all pedestrian pathways in the site plan are publicly accessible by all pedestrians and will address all sidewalk gaps. This can increase pedestrian access and internal connectivity within the site. As a result, the project is not considered to have an adverse effect based on criterion 10.

A project is considered deficient if it disrupts existing or planned pedestrian facilities or conflicts with adopted City non-auto plans, guidelines, policies, or standards, according to criterion 11. According to the site plan, the sidewalks proposed by the project would meet the minimum widths set by the project for these facilities and thus would not conflict with its planned pedestrian facilities. The project does not conflict with other adopted City non-auto plans, guidelines, policies, or standards, and is thus not considered to have an adverse effect based on criterion 11.

Criterion 12 considers a project deficient if it adds trips to an existing transportation facility that does not meet current design standards. The project will be providing updated transportation facilities which meet the current design standards and, therefore, is not considered to have an adverse effect based on criterion 12.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 151 Criterion 13 states the project is deficient if it increases vehicle trips to a roadway with a PQ OS score of 3 or more. The project will be adding new facilities with a PQOS score assumed to be 1 and, therefore, would not be considered to have an adverse effect based on Criterion 13.

Exhibit 10
St
evens C
reek
Permanente Cr eek
£¤101
·|}ÿ85
San
Antonio
Rd
Rengstorff Ave
Shoreline Blvd
Shoreline Blvd
Garcia Ave
Middlefield Rd
Middlefield Rd
BayshorePkwy
Alvin St
Charleston Rd
BayshoreRd
Old Middlefield Way
Charleston Rd
Amphitheatre Pkwy
W:\San Jose N Drive\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\GIS\MXD\SJ21_2116_2022_08\SJ21_2116_walksheds_Bikesheds.aprx Pedestrian Quality of Service
City of Mountain View
North Bayshore Precise Plan Boundary
North Bayshore Master Plan Boundary
P
edestrian Quality of Service Score
QOS 1: Best Quality of Service
QOS 2
QOS 3
QOS 4
QOS 5: Lowest Quality of Service
Figure 31
Shoreline at
Mountain View R
egional Park
]
Source: City of Mountain View, Caltrans,
Esri, OSM, Alta Planning. November 2021
Exhibit 10
Montecito Ave
Shoreline Blvd
Shoreline Blvd
Moffett Blvd
Central Expy
Middlefield Rd
Amphitheatre Pkwy
Old Middlefield Way
Stierlin Rd
Rengstorff AveCharleston Rd
Rengstorff Ave
Garcia Ave Montecito Ave
Shoreline Blvd
Shoreline Blvd
Moffett Blvd
Central Expy
Middlefield Rd
Amphitheatre Pkwy
Old Middlefield Way
Stierlin Rd
Rengstorff AveCharleston Rd
Rengstorff Ave
Garcia Ave

0.5 Miles
Pedestrian Walksheds
Figure 32
Future WalkshedsExisting Walksheds

0.5 Miles
£¤101
£¤
101
·|}ÿ85
£¤101
£¤
101
·|}ÿ85
Pedestrian Walksheds
5 minutes
10 minutes
15 minutes
City of Mountain View
North Bayshore Precise Plan Boundary
North Bayshore Master Plan Boundary
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
154

11. Bicycle Operations
The bicycle operations analysis presented in this chapter references existing bicycle facilities and environment; summarizes the primary biking routes between residential, office, retail, and public uses in the NBS Master Plan; evaluates the bicycle level of traffic stress (LTS) within one-half-mile of the bicycle study area; and identifies potential bicycle-oriented improvements.

11.1 Existing Conditions
As described in the Existing Condition section, Class II Bike Lanes exist along Shoreline Boulevard, Charleston Road, Amphitheatre Parkway, Bayshore Parkway, and Rengstorff Avenue in the NBS Master Plan area. Class III Bike Routes exist along the segment of Shoreline Boulevard north of Charleston Road.

Existing Class I Shared-Use Paths near the NBS Master Plan area include the Stevens Creek Trail, Permanente Creek Trail, and the Green Loop, all of which have asphalt or concrete surfaces.

11.1.1 Existing Conditions Bicycle Level of Traffic Stress Level of traffic stress (LTS) is closely related to the Four Types of Cyclists theory with the following types:
• BLTS 1: Roadway is comfortable for all ages and abilities. • BLTS 1.5: Roadway is comfortable for people of all ages and abilities on residential streets • BLTS 2: Roadway is comfortable for interested but concerned cyclists • BLTS 3: Roadway is comfortable for somewhat confident cyclists • BLTS 4: Roadway is comfortable for highly confident cyclists only Most cyclists are generally considered to be interested and concerned. Whereas the Four Types of Cyclists theory highlights people’s willingness to bicycle, LTS measures the quality of a person’s experience while bicycling. Low stress bikeways (LTS 1 and 2) are tolerated by most cyclists; in contrast, high stress bikeways are only tolerated by Strong and Fearless cyclists. The development of a low -stress network and elimination of high-stress barriers is critical to broaden the appeal of bicycling, especially for Enthused and Confident and Interested and Concerned cyclists.

An LTS analysis was conducted as part of AccessMV using the existing and future network to assess changes in LTS ratings. Under Existing Conditions, Shoreline Boulevard between Charleston Road and North Road is an LTS 4, while Amphitheatre Parkway and Charleston Road are an LTS 3. The rest of the NBS Master Plan site areas are LTS 1 and 2. With these bicycle facilities, the LTS is shown to be less stressful for most bicyclists within the plan area. Figure 33 shows the Existing LTS Network from AccessMV.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 155

11.2 Project Conditions
A 3.7 mile off-street and on-street bicycle network is proposed to provide a variety of options for cyclists of all ages and capabilities. The bicycle network will include expansions of and enhancements to existing bike facilities as well as new connections to the regional bike network. Bikeshare services will be integrated into transit stations to support last-leg connections. Because the NBS Master Plan provides a general level of detail of the land use and transportation network, there will be a need to conduct additional transportation analysis during the PCP (Planned Community Permit) stage and may require subsequent site specific transportation analysis to ensure that each mode of travel and the project site are designed and built to the City’s specifications. Short-term bicycle parking will be easily accessible from bicycle lanes, highly visible and near areas of high pedestrian activity. Long term bicycle parking intended for residents and employees will be provided internally within residential and office buildings, respectively.

Figure 34 shows destinations within a 5-minute bike ride of the Master Plan’s geographic center.

Within the bicycle study area, a portion of Charleston Road and Shoreline Boulevard is defined by the NBPP as a transit boulevard, which prioritizes transit and shuttles over other modes of transportation.

Bicycling path and distances to the transit stops on Charleston Road and Shoreline Boulevard are summarized below:
• The primary bicycling paths to the transit stop on Charleston Road west of Shoreline Boule vard include the cycle tracks along Joaquin Road, Shoreline Boulevard, and Charleston Road. The stop is within a 5-minute bike ride from most of the office and residential buildings within the NBS Master Plan area.
• The primary bicycling paths to the transit stop on Charleston Road east of Shoreline Boulevard include the cycle tracks along Shoreline Boulevard and Charleston Road. The stop is within a 5-minute bike ride from most of the office and residential buildings within the NBS Master Plan area. • The primary bicycling paths to the transit stop on Shoreline Boulevard include the cycle tracks along Shoreline Boulevard and the portion of the Green Loop south of Charleston Road. The stop is within a 5-minute bike ride from most of the office and residential buildings within the NBS Master Plan area.

11.2.1 Project Conditions Bicycle Level of Traffic Stress (LTS) Table 32 presents the number of street miles within the NBPP area at the different LTS ratings under Existing and Project Conditions to demonstrate the overall change in LTS with the project. The number of street miles increases from 2 to 4.5 due to the new streets and greenways with the NBPP. The increase was calculated based on the new street and greenway additions with the addition of the North Bayshore area. The addition of low stress bicycle network components improves the overall quality of the NBPP streets. The enhanced street grid creates smaller blocks, improving the directness of biking between origins and destinations within the NBPP area for all ages and abilities, including seniors and school-aged children. Under Project Conditions, all streets are rated very good or good with respect to the bicycle level of traffic stress score. These represent the levels of traffic stress tolerated by mainstream riders. As shown in Figure 35, the NBS Master Plan, with potential improvements, such as the addition of bike lanes on all Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
156
roadways within the NBS Master Plan area, would improve the bicycle LTS sitewide to an LTS 1. The NBS Master Plan site will connect to the city’s low-stress network via the connections across US 101.

Table 32: Existing and Project Conditions Bicycle Level of Traffic Stress Existing Conditions Project Conditions
NBS Master Plan Area NBS Boundary NBS Master Plan Area NBS Boundary LTS
Rating
Street
(Miles)
% Street
(Miles)
Street
(Miles)
% Street
(Miles)
Street
(Miles)
% Street
(Miles)
Street
(Miles)
% Street
(Miles)
1 (Very
Good) 1 50% 4 25% 4.5 100% 17 81%

1.5 (Good) 0.5 25% 4 25% 0 0 2.5 12%
2 (Good) 0 0 2 13% 0 0 1 5%
3 (Fair) 0.5 25% 5 31% 0 0 0 0
4 (Poor) 0 0 1 6% 0 0 0.5 2%
Total 2 100% 16 100% 4.5 100% 21 100%
Source: Fehr & Peers, 2023.

11.3 Bicycle Volumes
The proposed plan’s bicycle network will include expansions of and enhancements to existing bike facilities as well as new connections to the regional bike network. The new urban grid will create a dense and flexible network and provide safe and direct bicycle connections to neighborhood services, places of work, residences, amenities, parks and open space, and transit facilities. With the new bicycle network, certain streets will be faced with higher bicycle volumes. As described in the traffic forecast section, the project is expected to generate approximately 600 bicycle trips in each peak hour, in addition to bicycle travel that will occur to/from the district garage and transit stops. Charleston Road and Shoreline Boulevard are expected to be the roads with the highest bicycle volumes due to proximity to project land uses, district garages, and transit stops. Appendix B shows projected future bicycle volumes. The following intersections are expected to experience the largest amount of bicycle volume (approximately 100 bicycles per hour):
• Alta Avenue and Charleston Road
• Huff Avenue and Charleston Road
• Joaquin Road and Charleston Road
• Shoreline Boulevard and Charleston Road
• Shoreline Boulevard and Space Park Way
• Shoreline Boulevard and Plymouth Street
• Amphitheatre Parkway and Garcia Avenue-Charleston Road • Rengstorff Avenue and Leghorn Street
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 157 Recommendations for these intersections or mid-block locations would be bike boxes at the intersections, coordinated signal timing, separated bicycle phasing, green pavement, no right on red, curb bulb outs, dashed green paint at conflict points, installation of counters to detect pedestrians and bicyclist movements and volumes, roundabouts, pedestrian or bike scramble, or leading pedestrian intervals.

Additional specific recommendations shall be required at a later stage during individual project PCP (Planned Community Permit) stage and may require subsequent site specific MTAs planning community permit phase.

11.4 Adverse Effects Evaluation
As shown in Table 5: Criteria for Determining Adverse Effects and Operational Deficiencies and listed below, there are three adverse effect criteria for the bicycle operations evaluation:
• Criterion #14: The project disrupts existing or planned bicycle facilities or conflicts with adopted City non-auto plans, guidelines, policies, or standards. • Criterion #15: The project adds trips to an existing transportation facility (e.g., bikeway) that does not meet current design standards. The project increases vehicle trips to a roadway with a BLTS score of 3 or 4.
• Criterion #16: The project does not connect to the City’s low-stress (LTS 1 to 2) bike network.

A project is considered deficient if it disrupts existing or planned pedestrian facilities or conflicts with adopted City non-auto plans, guidelines, policies, or standards, according to criterion 14. The project proposes a 3.7 mile off-street and on-street bicycle network which will cover all bicycle gaps in the NBS Master Plan network. As a result, the project is not considered to have an adverse effect based on criterion 14.

Criterion 15 considers a project deficient if it adds trips to an existing facility that does not meet current design standards or to a roadway with a bicycle LTS score of 3 or 4. The project will be constructing new facilities that meet the current design standards and thus is considered to not have an adverse effect per criterion 15.

Criterion 16 evaluates the projects connection to the City’s low-stress (LTS 1 or 2) bicycle network. Due to the new additions of bicycle facilities across the project, there is not an adverse effect per criterion 16.

Exhibit 10
Steven
sCreek
Per
man
ente Cr
eek
£¤101
·|}ÿ85
San
Antonio
Rd
Rengstorff Ave
Charleston Rd
Shoreline Blvd
Shoreline Blvd
Garcia Ave
Middlefield Rd
MiddlefieldRd
Bayshore Pkwy
Alvin St
Charleston Rd
BayshoreRd
Old Middlefield Way
AmphitheatrePkwy
W:\San Jose N Drive\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\GIS\MXD\SJ21_2116_2022_08\SJ21_2116_walksheds_Bikesheds.aprx Existing Bicycle Level of Traffic Stress
City of Mountain View
North Bayshore Precise Plan Boundary
North Bayshore Master Plan Boundary
Existing LT
S
BLTS 1 All Ages and Abilities
BLTS 1.5 All Ages and Abilities (Residential)
BLTS 2 Interested But Concerned
BLTS 3 Somewhat Confident
BLTS 4 Highly Confident
Figure 33
Source: City of Mountain View, Caltrans,
Esri, OSM, Alta Planning. November 2021
Shoreline at
Mountain View Regional P
ark
]
Exhibit 10
Montecito Ave
Central Expy
San Antonio Rd
Moffett Blvd
Foothill Expy
Middlefield Rd
Castro St
Charleston Rd
Clark Rd
Oregon Expy
Easy St
Shoreline Blvd
Grant Rd Montecito Ave
Central Expy
San Antonio Rd
Moffett Blvd
Foothill Expy
Middlefield Rd
Castro St
Charleston Rd
Clark Rd
Oregon Expy
Easy St
Shoreline Blvd
Grant Rd
1 Miles
Bicycle Bikesheds
Figure 34Bikesheds
5 minutes
10 minutes
15 minutes
City of Mountain View
North Bayshore Precise Plan Boundary
North Bayshore Master Plan Boundary
£¤101
£¤
101
·|}ÿ85
£¤101
£¤
101
·|}ÿ85
Future BikeshedsExisting Bikesheds
1 Miles
Exhibit 10
Steven
sCreek
Per
man
ente Cr
eek
Charleston Rd
Garcia Ave
£¤101
·|}ÿ85
San
Antonio
Rd
Rengstorff Ave
Shoreline Blvd
Shoreline Blvd
Middlefield Rd
MiddlefieldRd
Bayshore Pkwy
Alvin St
BayshoreRd
Old Middlefield Way
Amphitheatre Pkwy
W:\San Jose N Drive\Projects\_SJ21_Projects\SJ21_2116_NBS_MP_VMT_MTA\Graphics\GIS\MXD\SJ21_2116_2022_08\SJ21_2116_walksheds_Bikesheds.aprx Project Conditions Bicycle Level of Traffic Stress
City of Mountain View
North Bayshore Precise Plan Boundary
Project Area
Future LT
S
BLTS 1 All Ages and Abilities
BLTS 1.5 All Ages and Abilities (Residential)
BLTS 2 Interested But Concerned
BLTS 3 Somewhat Confident
BLTS 4 Highly Confident
Figure 35
Shoreline at
Mountain View Regional P
ark
]
Source: City of Mountain View, Caltrans,
Esri, OSM, Alta Planning. November 2021
Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 161

12. Parking Assessment
The parking assessment presented in this chapter references the existing parking environment, summarize the proposed parking supply by location and land use type, and compares the proposed supply the NBPP parking requirements for vehicles and bicycles.

12.1 Existing Conditions
The parking in the existing plan area is characterized by surface parking lots that front/surround most individual buildings. There currently are no below grade or above ground parking garages within the Project area.

12.2 Project Conditions
This section summarizes the project’s parking supply and compares it to parking standards specified in the NBPP.

12.2.1 Proposed Parking Supply and Requirements
The NBS Master Plan parking strategy proposes to relocate and consolidate the existing surface lots into centralized district parking facilities with a limited amount of surface parking retained at individual sites. A total of 12,708 parking spaces are proposed, including 7,274 in district parking and 5,434 in on-site parking locations. Of these 4,550 are allocated for residential uses, 6,587 to office uses and 1,203 to retail/visitor, and 368 to hotel uses. Each parking location will serve different land uses and thus affect how vehicles travel on the local streets. Table 33 shows the proposed parking supply by location and land use.

Table 33: Parking Supply by Location and Land Use
Parking Location Parking
Spaces1
Residential
Parking Office Retail/Active/
Visitor Hotel

1. District Garage (JN-P-1) 500 0 0 500 0

2. District Garage (JS-P-1) 700 0 450 57 193

3. District Garage (SB-P-1) 600 0 0 425 175

4. Amphitheatre District Garage
(SA-P-1) 4,584 0 4,584 0 0

5. Marine Way District Garage
(MW-P-1 and MW-P-2) 890 0 890 0 0

6. On-site parking 5,434 4,550 663 221 0
Total 12,708 4,550 6,587 1,203 368
Source: Google Parking Summary, 2022.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
162
The goal of the parking strategy is to reduce parking demand by constraining supply and sharing parking where possible. This will support a more efficient parking strategy, freeing up land for open space, housing, office, and other uses. Parking will be composed of on-site parking and off-site district parking:
• Residents will use on-site parking, while residential visitors will use district parking garages. • 90% of office employees and visitors will use district parking garages, while 10% of office employees and visitors will use on-site parking.

District parking is provided at five locations within the NBS Master Plan area include the following:
• JN-P-1 (Joaquin North) is located at the southwest corner of Monarch Street and Joaquin Road within the Joaquin North neighborhood and contains approximately 500 parking spaces. JN -P-1 serves active uses and hotel, neighborhood parks, open spaces, and residential visitor parking. • JS-P-1 (Joaquin South) is a 6-level parking garage location in the Joaquin South neighborhood that contains approximately 700 parking spaces. JS-P-1 serves office (450 parking spaces), retail, and hotel uses (250 parking spaces).
• SB-P-1 (Shorebird) is located at the northeast corner of Space Park Way and Manzanita Street within the Shorebird neighborhood and contains approximately 600 spaces. SB-P-1 serves hotel and active uses as well as residential visitor parking.
• SA-P-1 (Amphitheatre) is a 6-level parking garage located at the northwest corner of Shoreline Boulevard and Charleston Road that contains approximately 4,584 parking spaces for the NBS Master Plan (4,334 parking spaces), the police operations station (10 parking spaces), and the public parking spaces (240 parking spaces). SA-P-1 serves office employee parking. • MW-P-1 & MW-P-2 (Marine Way) are 2- to 3-level parking garages along Marine Way that contain approximately 890 parking spaces. Both parking garages serve office uses.

In addition to the district parking locations, the NBS Master Plan includes office and residential on -site parking location within the NBS Master Plan area. The NBS Master Plan provides 90% of the office parking in district office parking garages MW-P-1, MW-P-2, SA-P-1 and JS-P-1, and only 10% of the office parking in office on-site parking locations adjacent to the office buildings. On-site parking within each neighborhood20 includes the following:
• Joaquin North neighborhood includes 2,531 on-site parking spaces for residential, retail, office, and active land uses.
• Joaquin South neighborhood includes 746 on-site parking spaces for residential, retail, office, and hotel land uses.

20 Allocation of residential, office, and retail/commercial on-site parking spaces to each neighborhood assumes that vehicles will park close to their desired destination; therefore, the on-site parking is distributed based on the land use allocation by neighborhood.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 163 • Shorebird neighborhood includes 1,826 on-site parking spaces for residential, retail, office, hotel, and active land uses.
• Pear neighborhood includes 331 on-site parking spaces for residential and retail land uses.

12.2.2 Vehicle Parking Requirements and Supply
Table 34 outlines the vehicle parking maximums for Office/R&D and Residential land uses from Chapter

6.11 of the NBPP. For office uses, the maximum parking supply is 2.7 spaces per 1,000 square feet. For residential uses, maximum parking supply rates of 0.25, 0.5, and 1.0 spaces per unit for micro/studios, 1 - bedroom, and 2+-bedroom units, respectively. The NBPP does not set minimum or maximum parking standards for retail, hotel, and community use, therefore the parking supplies will be equivalent to the Institute of Transportation Engineers’ Parking Generation manual peak period parking demand for the most comparable land use as determined by the Zoning Administrator. The NBP Master Plan meets the proposed parking maximum provided per the NBPP.

Table 34: Vehicle Parking Requirements
Land Use Size
(ksf) NBPP Parking Requirements1
Parking
Maximum
per NBPP
Parking
Proposed by
Plan2
Meet?
Office/Research
and Development 3,146 Maximum 2.7 parking stalls per 1,000 sf of gross building floor area 8,494 6,587 Yes
Retail/Commercial 265 No Maximum3,4 898 1,203 Yes
Residential –
Market Rate5

1,120
2,240
1,960
280
Parking ratio maximums by unit type:

Micro-units 0.25 spaces/unit
1 BR: 0.5 spaces/unit
2 BR: 1.0 spaces/unit
3 BR: 1.0 spaces/unit

280
1,120
1,960
280
4,603 4,550 Yes

Residential –
Affordable6

350
350
350
350
Parking ratio maximums by unit type:

Micro-units: 0.25 spaces/unit
1 BR: 0.5 spaces/unit
2 BR: 1.0 spaces/unit
3 BR: 1.0 spaces/unit

88 175
350
350
Hotel 525 0.70 spaces per key 258 368 Yes
Total 14,253 12,708 Yes
Notes:

1. Mountain View North Bayshore Precise Plan. Section 6.11, Off-Street Parking Requirements. (blobdload.aspx (mountainview.gov)

2. Mountain View North Bayshore Framework Master Plan: TDM Plan. Section 2.2, Project Description. January 2023.

3. For uses with no maximum, the equivalent to the Institute of Transportation Engineers’ Parking Generation manual peak period parking demand for the most comparable land use was used to calculate the maximum spaces.

4. Since the NBPP does not set a maximum parking supply for retail uses, for this evaluation we relied on information from the Institute of Transportation Engineers’ Parking Generation manual. Land Use: 820 Shopping Center was the most comparable use based on the size of the retail space. 3.68 per 1,000 square feet was used.

5. NBS Master Plan market rate residential housing (mix of 60% studio and 1-bedroom apartments and 40% 2- and 3-bedroom dwelling units) with a reduced residential parking supply rate of 0.65 spaces per dwelling unit.

6. NBS Master Plan market rate residential housing (mix of 25% studio, 1-bedroom, 2-bedroom, and 3-bedroom dwelling units with a reduced residential parking supply rate of 0.69 spaces per dwelling unit.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
164
Source: Fehr & Peers, 2023.

As shown in Table 34, the NBS Master Plan’s proposed parking supply would meet the NBPP requirements.

12.2.3 Parking TDM Measures
Chapter 6.12 in the NBPP outlines the carshare parking standards by land use type. The carshare vehicle requirement for office/research and development land uses is a minimum of three parking spaces per building site for carshare operators. For residential land use, the carshare vehicle requirement is at least one carsharing space for residential parking lots with over 50 parking spaces and at least two carsharing spaces plus 1 space for every 200 additional spaces for residential lots 200 plus. Dedicated carshare spaces will be provided in all garages in the NBS Master Plan area. For office parking, this includes a minimum of 3 car share spaces in each office parking lot. For residential parking, this includes at least 1 space for residential lots over 50 spaces and at least 2 spaces for residential lots over 200 spaces, plus 1 for every additional 200 dwelling units. Car share spaces may also be clustered in centralized locations.

The NBS Master Plan’s provision of carshare spaces in all parking locations would meet the NBPP requirements.

12.2.4 Bicycle Parking Supply and Requirements
Table 35 outlines the short-term and long-term bicycle parking requirements for office/research and development, retail/commercial, and residential land use according to Chapter 6.7 of the NBPP and the parking supply for the corresponding land use type provided by the NBS Master Plan. As shown in the table, the NBS Master Plan would provide sufficient bicycle parking spaces to meet the NBPP requirements. In addition to short-term and long-term parking, the NBS Master Plan would provide a minimum of 157 showers in bicycle parking facilities for office/research and development uses to meet the NBPP requirement of 1 unisex shower for the first 40 ksf and 1 unisex shower for every additional 20 ksf.

Table 35: Bicycle Parking Requirements
Land Use
Size
(ksf /
units)
Short-Term
Parking
Ratio1
Required
Short-Term
Parking per
NBPP
Proposed
Short-Term
Parking
Supply2
Long-Term
Parking
Ratio1
Required
Long-Term
Parking per
NBPP
Proposed
Long-Term
Parking
Supply2
Office/Research
and Development 3,150 1 per 10,000 sf 315 315 1 per 2000 sf 1,575 1,575 Retail/Commercial 265 1 per 5000 sf 53 53 1 per 5000 sf 53 53 Residential 7,000 1 per 10 units 700 700 1 per unit 7,000 7,000 Notes:

1. Mountain View North Bayshore Precise Plan. Section 6.7, Bike Parking and Commuter Amenities. (blobdload.aspx (mountainview.gov)

2. Mountain View North Bayshore Framework Master Plan: TDM Plan. Section 2.2, Project Description. March 2022.

Source: Fehr & Peers, 2023.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 165

12.3 Adverse Effect Evaluation
As shown in Table 5 and listed below, there are four adverse effect criteria for the parking evaluation:
• Criterion #17: The project increases off-site parking demand in the project area. • Criterion #18: The project proposes more parking than allowed by the City's Zoning Code. • Criterion #19: The project parking results in significant spillover into adjacent neighborhoods. • Criterion #20: Parking reduction—requires parking study to demonstrate effective parking management and adequate parking to serve project.

Criterion 17 states that the project would be considered deficient if it increases off -site parking demand in the project area. The project does not increase off-site parking demand in the project area as it will provide enough on-site parking spaces to accommodate the increased demand. Off-site parking is provided in the NBS Master Plan intentionally to avoid adverse effects. As a result, the project is not considered to have an adverse effect based on criterion 17.

Criterion 18 considers a project deficient if it proposes more parking than allowed by the City’s Zoning Code. As shown in Table 34, the project proposes less parking than what is required by the City’s Zoning Code and thus does not have an adverse effect based on criterion 18.

Criterion 19 states that a project would be considered deficient if it results in significant spillover into adjacent neighborhoods. The project provides enough on-site parking based on the Vehicle Parking Requirements to accommodate the future demand of the project area, more discussion of this is in the bicycle and pedestrian operations sections. Therefore, the project is not considered to have an adverse effect based on criterion 19.

Criterion 20 considers a project deficient if it utilizes a parking reduction that would require a parking study to demonstrate effective parking management and adequate parking to serve the project. The project does not utilize any parking reductions and would not have an adverse effect per criterion 20.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
166

13. Transportation Demand
Management
The NBS Master Plan will implement a TDM program to achieve a 35% morning peak hour inbound single-occupancy vehicle mode share at the development driveways (or district parking structures) for all non-residential development in the NBS Master Plan area. The NBS Master Plan’s TDM Plan is a description of Google’s approach to reducing vehicle trips by offering employees and residents transportation choices to meet the City’s policy requirements and sustainability goals. The TDM Plan describes City of Mountain View transportation policies related to TDM and serves as a guide on how Google will implement the TDM Plan and monitor its success. Specifically, the TDM Plan would implement various TDM measures consistent with the North Bayshore Transportation Demand Management (TDM) Plan Guidelines (2015) for non-residential development and the North Bayshore Residential Transportation Demand Management Guidelines (2018) for residential development. The TDM plan is a living document that will be reviewed and updated over time to respond to employee behavior and transportation programs. The TDM Plan would implement a variety of TDM measures categorized in the following six TDM programs (Summary from Figure 4.1.5 on Page 25 of the NBS Master Plan TDM Plan; TDM reduction relative to an existing 67.5% SOV mode share)21:
• Active Mobility (Estimated TDM Reduction of 15%)
o Walk/bike from shorebird residential; bicycle parking, shower and changing facilities; bicycle sharing; bicycle incentives; on-site bicycle repair facilities; bicycle buddy programs; bicycle giveaway program.
• Ridesharing and Car Sharing (Estimated TDM Reduction of 5%) o Priority parking for carpools and vanpools; rideshare matching services; subsidized or free vanpools or carpools; expanded carpool matching; and car sharing. • Shuttle and Transit (Estimated TDM Reduction of 30%)
o Shuttle services [including midday service and commute peak hour]; pre-tax commuter benefits; and commuter shuttle services [ranging from long haul, first-last mile connections, and public transit hubs].
• Flexible Work Schedule (Estimated TDM Reduction of 2%) o Flexible work schedules, and emergency ride home
• Marketing (Estimated TDM Reduction of 2%)
o On-site transportation coordinator; membership in the TMA; marketing and information. • Site Design and Other Measures (Estimated TDM Reduction of 10%)

21 North Bayshore Transportation Demand Management (TDM) Plan Guidelines (2015) for non-residential development and the North Bayshore Residential Transportation Demand Management Guidelines (2018) Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis 167 o Parking cashout; parking supply; [unbundled parking; parking pricing]; on-site amenities and services; funding district-wide services, other TDM measures.

With this TDM Plan in mind, this chapter evaluates the NBS Master Plan’s conformance with the North Bayshore District Trip Cap Policy for each of the three gateways at San Antonio Road, Rengstorff Avenue, and Shoreline Boulevard, the three gateways combined, and the approved North Bayshore District Trip Cap Policy trip targets where the Rengstorff and Shoreline gateways are combined. Vehicle trip caps were specified in the 2017 NBPP; however, the NBS Master Plan’s conformance is compared to the approved North Bayshore District Trip Cap Policy from the 2021 North Bayshore Circulation Study. The Circulation Study, approved by City Council December 2021, includes recommendations for the Priority Transportation Improvements, modifies the single-occupancy vehicle trip rate for office development, and provides a new North Bayshore District Trip Cap Policy trip target.

The policy targets recommended in the Circulation Study are presented in Table 36. The recommended thresholds are for the inbound 3-hour peak period during the morning and the outbound 3-hour peak period during the evening for Shoreline Boulevard and Rengstorff Avenue gateways combined. These targets include all the transportation improvements listed in Table 3 and Figure 5 in the introduction chapter.

Table 36: Recommended North Bayshore District Trip Cap Policy Targets Gateway Inbound Morning Peak Period Outbound Evening Peak Period Shoreline Boulevard & Rengstorff Avenue 20,730 18,300
Note: Vehicle volumes rounded to nearest 10.

Source: City of Mountain View, North Bayshore Circulation Study staff report, December 2021.

Table 37 compares the North Bayshore gateway volumes under Cumulative with Project Conditions with the recommended North Bayshore District Trip Cap Policy trip target from the Circulation Study. The comparison shows that the individual gateways trip targets are met during all peak periods, except for Shoreline Boulevard during the evening peak period, where the vehicle volume exceeds the gateway trip target by 10%. For the combined gateways, the volume is less than the trip target during both peak periods. For the recommended North Bayshore Trip Cap Policy at Shoreline Boulevard and Rengstorff Avenue combined, the vehicle volume is less than the trip target during both peak periods and the NBS Master Plan is in conformance with the recommended North Bayshore Trip Cap Policy trip targets.

Exhibit 10

North Bayshore Master Plan: Multi-Modal Transportation Analysis March 2023
168
Table 37: North Bayshore Gateway Trip Cap Policy Evaluation: Circulation Study Targets Gateway
Inbound Morning Peak Period Outbound Evening Peak Period Volume1 Trip
Target1,2
Remaining
Trip Target
Percent of
Trip Target
Remaining
Volume1 Trip
Target1,2
Remaining
Trip Target
Percent of
Trip Target
Remaining
Individual Gateways
San Antonio Road 3,510 4,140 630 15% 2,400 3,620 1,220 34% Rengstorff Avenue 8,690 11,100 2,410 22% 8,130 9,240 1,110 12% Shoreline Boulevard 9,230 9,630 400 4% 9,990 9,060 -930 -10% Combined Gateway3
Total 21,430 24,870 3,440 14% 20,520 21,920 1,400 6%
Gateway Trip Cap Comparison
Shoreline Boulevard &
Rengstorff Avenue 17,920 20,730 2,810 14% 18,120 18,300 180 1% Notes:

1. Vehicle volumes rounded to nearest 10.

2. San Antonio gateway trip target based on 2014 NBPP, and Rengstorff Avenue and Shoreline Boulevard gateway trip targets based on 2021 Circulation Study.

3. The combined gateways are the sum of the San Antonio Road, Rengstorff Avenue, and Shoreline Boulevard gateways.

Source: Fehr & Peers, 2023.

Exhibit 10

APPENDICES ARE AVAILABLE

UPON REQUEST

Contact Project Planner
Diana Pancholi
[email protected]
Exhibit 10
Appendix A:

Existing Intersection Counts
Exhibit 10

Appendix B:

Intersection Level of Service
Calculation (Existing
Conditions, Cumulative with Project
Conditions, and Cumulative with
Project Conditions - Operational
Improvements)
Exhibit 10

Appendix C:

Cross Sections with City Comments

Exhibit 10

Appendix D:

Gated Access Queuing Summary and
Driveway LOS Calculations

Exhibit 10

Appendix E:

North Bayshore Precise Plan with
Residential – Project Trip
Generation Estimates Memorandum

Exhibit 10

Appendix F:

North Bayshore Master Plan – Project
Trip Generation Memorandum and
Detailed Gateway Trip Generation
Exhibit 10

Appendix G:

North Bayshore Precise Plan
Intersection Improvement
Exhibit 10

Appendix H:

LOS and Queue Summary
Exhibit 10

Appendix I:
95th Percentile Queues (Existing
Conditions, Cumulative with Project
Conditions, and Cumulative with
Project Conditions – Operational
Improvements)
Exhibit 10