DATE:
April 23, 2024
CATEGORY:
Consent
DEPT.:
Public Works
TITLE: 2000 North Shoreline Boulevard—Public
Improvements
RECOMMENDATION
Accept the public improvements for the development at 2000 North Shoreline Boulevard for maintenance throughout their useful life.
BACKGROUND AND ANALYSIS
The “acceptance” of developer -installed improvements signifies that the developer has satisfactorily completed improvements in the City’s right-of-way. Once accepted, the City takes ownership of and maintenance responsibility for the improvements.
This development project included a 595,000 square foot office building and off-site parking. The public improvement plans were approved for construction on April 9, 2018.
The public improvements include:
Quantity Unit Item Description
38,538 SF Cycle track
18,775 SF Sidewalk
28,186 SF City Street
1,947 SF Curb and Gutter
20 EA ADA Curb Ramps
775 LF 15” Storm Drain Lines
572 LF 12” Storm Drain Lines
6 EA Storm Drain Catch Basins
5 EA Storm Drain Curb Inlets
8 EA Storm Drain Manholes
2 EA Sanitary Sewer Manholes
940 LF 8” DIP Water Main
2000 North Shoreline Boulevard—Public Improvements
April 23, 2024
Quantity Unit Item Description
80 LF 6” DIP Water Main
4 EA Fire Hydrant
3 EA 8” Gate Valve
5 EA 6” Gate Valve
80 LF 6” Water Service
4 EA 2” Water Meter
110 LF 8” Water Service
95 1
LF
EA
6” Recycled Water Line
6” Recycled Water Gate Valve
2 32
103
EA
EA
EA
2” Recycled Water Meter
Streetlights
Street Trees
3 EA Traffic Signal
1 EA Signalized Pedestrian Crossing
2 EA Rectangular Rapid Flashing Beacons (RRFB) Pedestrian Crossing
The public improvements for the development project have been completed to the satisfaction of the City Engineer and are in accordance with the City’s standard policy to accept the improvements for maintenance.
FISCAL IMPACT
The public improvements for this development were paid for by the developer.
ALTERNATIVES
Determine that the recommended improvements are not complete or in conformance with City standards and do not accept the improvements.
2000 North Shoreline Boulevard—Public Improvements
April 23, 2024
PUBLIC NOTICING
Agenda posting. A copy of the Council report was sent to the developer, Google LLC.
Prepared by:
Neli Avramova
Senior Civil Engineer
Reviewed by:
Ashraf Shah
Principal Civil Engineer
Quynh Byrer
Acting Assistant Public Works Director/
City Engineer
Approved by:
Edward Arango
Acting Public Works Director
Audrey Seymour Ramberg
Assistant City Manager
NA/LL/4/CAM
979-04-23-24CR
204031
cc: Google LLC
1600 Amphitheatre Parkway
Mountain View, CA 94043
APWD(A)— Byrer, PCE —Shah, PCE(A) —Gunn, SCE —Avramova, SPWI, SMA—Goedicke, [email protected]
, PA—Li, SMA—Doan, F (2000 North Shoreline Boulevard)