Public Works Department

DATE: June 4, 2024

TO: C ouncil Transportation Committee

FROM: Priyoti Ahmed, Transportation Planner
Ria Hutabarat Lo, Transportation Manager

VIA: Edward Arango, Acting Public Works Director

SUBJECT: Vision Zero Action Plan and Local Road Safety Plan

RECOMMENDATION

Review and recommend the City Council adopt the Integrated Vision Zero Action Plan/Local Road Safety Plan Draft Report.

BACKGROUND

On December 10, 2019
, Council adopted a Vision Zero Policy, which established a goal of reaching zero fatal traffic collisions by 2030 . Council also received information on existing, recent, and proposed actions cover ing the Vision Zero 7Es: E ngineering, Education, Encouragement, Engagement, Emergency Response, Evaluation, a nd Enforcement. One of the initial actions identified was to develop a Vision Zero Action Plan (VZAP) to identify priority projects, programs, strategies, and actions that encompass all 7Es.

In 2020, the City contracted with Nelson\Nygaard Consulting Associates , Inc. , to prepare an integrated VZAP and Local Road Safety Plan (LRSP).

VZAPs typically use a multi-pronged hotspot
approach to transportation safety by addressing key crash factors and improving conditions along High-Injury Network corridors (shown in Figure 1) using the 7Es. By comparison, LRSPs use a systemic infrastructure approach to transportation safety by identifying locations with similar characteristics to those of where fatal or severe injury collisions occurred a nd treating these locations with engineering countermeasures. Building on these two approaches, this integrated plan aims to:

1. I dentify priority segments and intersections based on systemic crash analysis and prioritization criteria;

Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 2 of 18 ends

2. D evelop eight emphasis areas to achieve Vision Zero; and

3. R ecommend multi-pronged actions.

Throughout the plan process, the project team provided input and received feedback from the Vision Zero Working Group, B icycle/Pedestrian Advisory Committee (BPAC) , Council Transportation Committee (CTC), and the broader Mountain View community.

Vision Zero Working Group

As part of the initial Vision Zero policy adoption, a Vision Zero Working Group (VZWG) was established to review and provide feedback on Vision Zero-related projects. This working group includes staff from multiple departments , including Public Works , Community Development, Police, Fire, City Manager’s Office, Community Services , and Library. Over the course of plan development, the VZWG met five times to review and provide feedback on crash analysis, emphasis areas, proven countermeasures, prioritization criteria, scored segments and intersections, infrastructure projects, and noninfrastructure program recommendations.

Community Meetings

While the VZAP/LRSP approach is largely a data-driven process based on Caltrans LRSP direction and F ederal Highway Administration (FHWA) Proven Safety Countermeasures, staff held two community engagement events for the public to provide feedback. The first community meeting was held virtually on March 22, 2022 , with 100 participants. Community members reviewed crash analysis findings , expressed their personal experience on recent crashes, and provided feedback on prioritization criteria and proven safety countermeasures. The second community meeting was an in-person open house on March 27, 2023 with 20 participants. C ommunity members reviewed and provided feedback on scored segments and intersections, infrastructure projects, and potential noninfrastructure program recommendations. Outreach for both events included postings on social media platforms, email blasts, and Citywide yard signs.

Bicycle/Pedestrian Advisory Committee and Council Transportation Committee

The BPAC reviewed and pr ovided feedback on key deliverables , including systemic collision analysis, a safety countermeasure s toolbox, prioritization criteria, scored locations , and draft recommendations at their meetings on January 27, 2021, March 30, 2022, August 22, 2022, and
February 22, 2023.

On March 27, 2024
, BPAC reviewed the draft VZAP/LRSP final report and supported the draft recommendations. BPAC also suggested th at staff add a recommendation related to implementing “No Right Turn on Red ” prohibitions at certain locations in the City and provided feedback on the importance of reporting traffic collisions involving pedestrians and bicyclists Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 3 of 18 ends

even if there are no apparent injuries. Additionally, BPAC members requested ongoing tracking and progress updates regarding implementation of VZAP/LRSP recommendations.

In addition to BPAC review, the CTC also reviewed and provided feedback on the VZAP/LRSP prioritization framework and draft infrastructure recommendations on May 3, 2022.

ANALYSIS

The VZAP/LRSP Draft Report compiles the analysis, findings , and recommendations developed through the integrated process. These findings are outlined below.

Systemic Safety Analysis and Safety Corridors

Based on the Caltrans LRSP methodology, a systemic safety analysis identifies risk factors associated with crashes to guide Citywide investments in countermeasures that could prevent crashes in similar locations. In Mountain View, the systemic analysis was conducted from 2014 to 2019.

The systemic safety analysis also identified the City’s High- Injury Network (HIN), which is largely equivalent to Safety Corridors, as described in Assembly Bill 43 (AB 43) and the California Vehicle Code (CVC). Based on the CVC,
1 a Safety Corridor is defined as a roadway segment within an overall roadway network where the highest number of serious injury and fatality crashes occur.

In Mountain View, the City’s Safety Corridors include the following:

1. Rengstorff Avenue from El Camino Real to Garcia Avenue/Charleston Road;

2. Shoreline Boulevard from El Camino Real to North Road;

3. California Street from San Antonio Road to Hope Street;

4. Ellis Street from Middlefield Road to Manila Avenue;

5. El Monte Avenue from Springer Road to El Camino Real;

6. San Antonio Road from El Camino Real to Central Expressway;

1 California Vehicle Code (CVC) Section 22358.7(a)(1) instructs Caltrans to define safety corridors in the revised California Manual on Uniform Traffic Control Devices (CA-MUTCD) based on considerations regarding the number of serious injuries and fatalities.

Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 4 of 18 ends

7. Middlefield Road from western C ity limit (400 ’ east of San Antonio Road) to Central Expressway; and

8. Old Middlefield Way from Middlefield Road to U.S. 101.

The City’s Safety Corridors represent approximately 7% of the overall roadway network, well within the 20% limit established by CVC. Furthermore, this percentage is consistent with surrounding jurisdictions such as Palo Alto and Sunnyvale.

In addition to the above Safety Corridors, El Camino Real and Central Expressway are also listed in the City’s High-Injury Network but do not meet Safety Corridor criteria due to being outside of the City’s authority. El Camino Real is under the authority of Caltrans, and Central Expressway is under the authority of the County of Santa Clara.

Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 5 of 18 ends

Figure 1: Crash Locations and the High-Injury Network in Mountain View, 2014 to 2019

Findings

Initial findings from the VZAP/LRSP regarding the HIN and crash contributing factors have been used to inform educational materials developed under the Safe Routes to School program, expand the City’s crossing guard program, prioritize infrastructure improvements along the HIN,

Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 6 of 18 ends

and seek grant funding for priority projects . Current or recently completed City projects along the High Injury Network are listed in Table 1 below:

Table 1: Current or Recent City Projects
Along the High Injury Network

Project from City’s Capital
Improvement Program (CIP)
Capital Project
Description
CIP 20-61 and 22-29, El
Camino Real Pedestrian and
Bicycle Improvements

High-Visibility Crossings, Pedestrian Hybrid Beacons,
Protected Bikeways on El Camino Real.

CIP 17-41, Stierlin Road
Bicycle and Pedestrian
improvements

Protected Intersection at Shoreline Boulevard/Montecito Avenue, Protected Bikeways on Shoreline Boulevard from
Montecito Avenue to Middlefield Road.

CIP 21-40, California Street
Complete Street
Improvement Pilot

Pilot Road Diet, High-Visibility Crossings, Midblock Crossings, Parking Protected Bikeways, and Protected Intersections.

CIP 21-37, Active
Transportation
Improvements

Shoreline Boulevard Pathway from Wright Avenue to Villa Street.

CIPs 19-61 and 21-38,
El Monte Corridor
Improvements

Road Diet, High-Visibility Crossings, Buffered Bike Lanes, Green Street Elements, Slip Lane Removal, Protected
Intersections (where feasible).

CIP 24-28, Street
Reconstruction (Middlefield
Road)

High-Visibility Crossings, Protected Bikeways, and Protected Intersections on Middlefield Road from Moffett Boulevard to Bernardo Avenue.

CIP 21-39, Grant Road and
Sleeper Avenue Intersection
Improvements

Pedestrian Hybrid Beacon at Grant Road/Sleeper Avenue.

CIP 16-27, Shoreline
Boulevard and Villa Street
Intersection Improvements

High-Visibility Crossings and Slip Lane Removal (completed).

Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 7 of 18 ends

Project from City’s Capital
Improvement Program (CIP)
Capital Project
Description
CIP 20-01, Street Resurfacing
(Miramonte Avenue)
Intersection Improvements with Rectangular Rapid Flashing Beacon, Bulbouts, and High-Visibility Crosswalks at Hans Avenue; Road Diet and Buffered Bike Lanes from Cuesta Drive to Castro Street; Two-Way Protected Bikeway (east side) from Hans Avenue to Castro Street; Sidewalk Gap Closure from Starr Way to Barbara Avenue.

CIP 16-59, Charleston Road
Improvements

Protected Bikeways, Protected Intersections, Sidewalks, Dedicated Transit Lanes from Shoreline Boulevard to Huff Avenue.

CIP xx-15 and xx-16, Annual
Traffic Infrastructure
Maintenance/Neighborhood
Traffic Management
Program

High-Visibility Crosswalks on Latham Street (complete); Buffered Bike Lanes on Cuesta Drive from Springer Road to Miramonte Avenue (complete); LED Enhanced Crosswalk at
Middlefield Road and Independence Avenue (complete);
Eight-Phase Signal at Shoreline Boulevard and Latham Street.

Development-Related
Improvements
Protected Bikeways on Amphitheatre Parkway; Protected
Intersections at Amphitheatre Parkway and Shoreline
Boulevard; Signal Upgrade at San Antonio Road and Fayette Drive (complete).

Infrastructure Recommendations

The VZAP/LRSP Draft Plan includes recommendations for infrastructure projects and noninfrastructure programs based on technical analysis and input from the VZWG, community meetings, and BPAC.

Caltrans guidance for LRSPs requires recommendations for specific infrastructure improvements at prioritized street corridors and intersections. Staff has included BPAC suggestion of including “No Turn on Red” countermeasure as part of El Camino Real and Grant Road intersection recommendation. Recommended corridor projects are listed in Table s 2 and Figure 2 , and recommended intersections projects are listed in Table 3 and Figure 3. Each recommendation is subject to further engineering feasibility analysis.

Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 8 of 18 ends

Table 2: Recommended Corridor Projects and Description

ID Corridor Segment/
Location
Recommended Improvements
Beyond Fiscal Year 2023-242
S-1 Rengstorff Avenue El Camino Real—Middlefield
Road
Green Complete Streets
S-2 Shoreline
Boulevard
El Camino Real—Middlefield
Road
Protected Bikeways from El Camino Real
to Montecito Avenue

S-3 California Street Showers Drive—Shoreline
Boulevard
Permanent Complete Streets Installation
(26-xx)

S-4 El Monte Avenue City Limits to El Camino Real El Monte Corridor Improvements (21-38 pending additional funding)

S-5 Ellis Street Full Extent Protected Bikeways

S-6 San Antonio Road Full Extent (in Mountain
View)
Complete Streets Overpass (by Caltrain
with County of Santa Clara and City of
Palo Alto)

S-7 East Middlefield
Road
East of State Route 85 Midblock Crossing at LRT and Sidewalk over State Route 85 and Stevens Creek
Trail

S-8 Latham Street West of Shoreline Boulevard Sharrows, Curb Extensions or Splitters, Advance Stop Bar, High-Visibility
Crosswalks, Bike Boulevard Signs and
Markings and Speed Humps West of
Escuela Avenue (16-38, Pages 26-27, 33-
35)

S-9 Grant Road City Limits—El Camino Real High-Visibility Crosswalks, New Bikeways, Martens Avenue to El Camino Real

S-10 Central
Expressway
Shoreline Boulevard—
Bernardo Avenue

High-Visibility Crosswalks, Protected
Bikeways (by County of Santa Clara)

S-11 Old Middlefield
Way
Full Extent

High-Visibility Crossings, Protected
Bikeways

2 Capital Improvement Program (CIP) references are based on the Council-adopted Fiscal Year 2023-24 Budget as outlined in the June 13, 2023 City Council meeting, Item 6.2, Attachment 1.

Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 9 of 18 ends

ID Corridor Segment/
Location
Recommended Improvements
Beyond Fiscal Year 2023-242
S-12 East Evelyn
Avenue
Full Extent

Bikeways (CIP 25-xx and 27-xx)

S-13 Amphitheatre
Parkway

Full Extent Protected Bikeways

S-14 North Whisman
Road

Central Expressway—
Fairchild Drive
Complete Streets

S-15 Miramonte
Avenue
El Camino Real—City Limit Complete Streets Upgrades Castro to El Camino Real (23-31) and City Limits to
Cuesta Drive

S-16 Sierra Vista
Avenue
Full Extent: Silverwood
Avenue—Rengstorff Avenue

Bike Boulevard Treatments

S-17 Cuesta Drive Miramonte Avenue—Grant
Road
Potential Road Diet (where feasible),
High-Visibility Crossings, Protected
Bikeways from Miramonte Avenue to
Grant Road

S-18 East Dana Street Calderon Avenue—
Moorpark Way
Speed reduction, Potential Road Diet,
Curb radii reduction, High-Visibility
Crossing, Slip Lane Removal, Protected
Bikeways over State Route 85

S-19 Garcia Avenue Bayshore Boulevard—
Amphitheatre Parkway

Protected Bikeways

Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 10 of 18 ends

Figure 2: Recommended Corridor Projects

Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 11 of 18 ends

Table 3: Recommended Intersection Projects and Description

ID Corridor Segment/Locati
on
Recommended Improvements
Beyond Fiscal Year 2023-243

I-1 El Camino
Real
Castro Street Protected Intersection (CIP 25-xx)
I-2-3 El Camino
Real
Escuela Avenue,
El Monte
Avenue
Protected Intersections (CIP 22-29)
I-4-6 El Camino
Real
Shoreline
Boulevard,
Calderon
Avenue, Sylvan
Road
Protected Intersections (27-xx)
I-7 Middlefield
Road
Independence
Avenue
Median Crossing Island, Rectangular Rapid Flashing
Beacon, Pedestrian Hybrid Beacon and Improved
Intersection Lighting
I-8 Charleston
Road
Amphitheatre
Parkway
High-Visibility Crossing, Protected Intersection
I-9 Ortega
Avenue
Latham Street Diverter, Curb Extension, High Visibility Crosswalk, Traffic Calming with Traffic Circle
I-10 Moffett
Boulevard
State Route 85 Protected Bikeways (24-03)
I-11 Rengstorff
Avenue
Old Middlefield
Way
High-Visibility Crossing
I-12 California
Street
Pacchetti Way Pedestrian Signal Modification, High-Visibility Crosswalk, Median Crossing, Curb Radius Reduction,
Bike Signal Phasing, Bike Treatment at Intersection
I-13 Whisman
Road
Middlefield
Road
High-Visibility Crossing, Protected Intersection
I-14 Whisman
Road
Flynn Avenue High-Visibility Crossing
I-15 Shoreline
Boulevard
Amphitheatre
Parkway
Curb ramp and hydrant relocation

3 CIP References are based on the Fiscal Year 2023-24 Budget as outlined in the June 13, 2023 City Council Item 6.2, Attachment 1.

Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 12 of 18 ends

ID Corridor Segment/Locati
on
Recommended Improvements
Beyond Fiscal Year 2023-243

I-16 East El
Camino Real
Grant Road High-Visibility Crosswalk, Reduced Curb Radius, Curb Extensions, Green-Colored Dashed Bike Lanes,
Pedestrian Signal Heads, Adjusted Signal Timing,
Pedestrian Refuge Islands, Bike Box, Right-Turn-On-
Red Restrictions
I-17 Sierra Vista
Avenue
Hackett Avenue High-Visibility Crossing, Bidirectional Ramp, Traffic Circle
I-18 Shoreline
Boulevard
Mountain
Shadows Drive
Pedestrian Hybrid Beacon
I-19 Rengstorff
Avenue
San Ramon
Avenue
Pedestrian Hybrid Beacon or Other Improvement
I-20 Charleston
Road
Independence
Avenue
Pedestrian Refuge Islands and High Visibility Crossing
I-21 Bryant
Avenue
Shady Spring
Lane
High Visibility Crossing
I-22 Rengstorff
Avenue
Plymouth
Street
Pedestrian Hybrid Beacon or Other Improvement
I-23 Evelyn
Avenue
Bernardo
Avenue
High-Visibility Crossing
I-24 Madison
Drive
Van Buren
Circle
Curb Extension

Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 13 of 18 ends

Figure 3: Recommended Intersection Projects

Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 14 of 18 ends

Noninfrastructure Recommendations

The noninfrastructure recommendations listed in Table 4 focus on policy and programming to improve road safety for all road users. Actions include:

• Safe Routes to School training and encouragement;

• Public messaging on speeding;

• Enforcement efforts focused on behaviors associated with fatal or severe injury crashes ; and

• P olicy and organizational efforts to support the City’s 2019 Vision Zero Policy goals.

The noninfrastructure recommendations were developed using the eight VZAP/LRSP emphasis areas and cover the following “Es”: Education, Encouragement, Engagement, Enforcement, Emergency Response, a nd Evaluation. In accordance with the FHWA Safe System Approach ,
noninfrastructure recommendations are presented in relation to the five safe system elements:

• Safe Road Users (RU);
• Safe Roads (SR);
• Safe Speeds (SP);
• Safe Vehicles (VE); and
• Post-Crash Care (CC).

In response to BPAC’s feedback, Table 4 includes noninfrastructure recommendations to explore “No Turn on Red” (SR -14) policy and provide ongoing progress report on VZAP/LRSP recommendations (SR-15).

Table 4: Noninfrastructure Recommendations

ID Description Timeline Dept Status
Safe Road Users
RU-1 Continue Safe Routes to School (SRTS) program with a focus on traffic safety training for students walking,
biking, taking transit and driving
Annual PW Under Way
RU-2 Strengthen SRTS collaboration and partnerships with parents, schools and students to encourage safe
walking, biking and school access
Annual PW Under Way
RU-3 Provide helmet giveaways and bicycle repairs at City or community events such as food pantries, back to
school events or Monster Bash
Annual PW/PD Under Way
Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 15 of 18 ends

ID Description Timeline Dept Status
RU-4 Conduct multilingual Vision Zero Outreach and
Marketing behavior change campaigns and targeted
media buys on emphasis areas
2024-25 PW/CMO Planning
RU-5 Lead community-promoted walk/bike tours in
different areas of the City with a focus on
encouragement and training for new users
Biannual PW Under Way
RU-6 Support traffic safety workshop or walk tour at Senior Center to identify issues and provide individualized
trip planning/tips for changing abilities
Biannual PW TBD
RU-7 Encourage community-based bicycle education and
safety classes covering basic skills, network awareness, laws, rules and safety tips
Annual PW TBD
RU-8 Implement programs, workshops, or trainings to
empower youth and address high-risk behaviors such
as riding against traffic, midblock turns, and not
wearing helmets
2024-25 PW/PD Planning
RU-9 Conduct high-visibility enforcement on speed,
distracted/impaired driving, yield compliance, red light running, and key maneuvers on HIN and school routes
Ongoing PD Under Way
RU-10 Implement multilingual ambassador program related to blocked bike lanes and red zones where parking in
such locations introduces safety concerns

TBD PW/PD TBD
RU-11 Periodically review the crossing guard program to optimize its effectiveness
Biannual PW/PD Under Way
RU-12 Provide universal graphics and/or multilingual
communications regarding high-visibility enforcement
activities
Annual PD/CMO TBD
RU-13 Encourage residential transportation demand
management strategies, including orientation on
getting around without a car
TBD PW Planning
RU-14 Support state legislation to incorporate
pedestrian/bicycle safety training into state education standards

TBD PW/CMO TBD
Safe Roads
SR-1 Implement Impaired Driving Policies (for more details see Attachment 1)

SR-2 Prioritize capital projects on the HIN and equity
priority locations
Biannual PW Under Way
SR-3 Obtain grants to accelerate implementation of priority capital projects to enhance safety of all road users
Biannual PW Under Way
SR-4 Advance SRTS walk audits observations into
recommendation
Annual PW Under Way
SR-5 Provide staff training on VZAP/LRSP 2024-25 PW TBD Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 16 of 18 ends

ID Description Timeline Dept Status
SR-6 Provide staff training on defensive driving in City vehicles
2024-25 PW TBD
SR-7 Provide staff training on Safe Systems Approach and safety countermeasures
2024 PW TBD
SR-8 Coordinate periodic site visits of VZ best practices with or without regional partners
Annual PW Under Way
SR-9 Adopt NACTO, PROWAG and/or other best practice
guidance to inform engineering judgment
2025 PW Under Way
SR-10 Update City standard details to reflect Vision Zero best practices
2026 PW TBD
SR-11 Provide multilingual VZ-informed outreach 2024-25 PW/CMO Under Way SR-12 Update VZAP update every five years Every 5
years
PW TBD
SR-13 Support state legislation to address potential safety improvements

TBD PW/CMO TBD
SR-14 Explore processes for implementing No Turn on Red (NTOR) and develop a policy for NTOR consideration
TBD PW Planning
SR-15 Report out on VZAP and LRSP recommendations to
BPAC
Annual PW Planning
SR-16 Review City protocols to improve consistency with Vision Zero policy

TBD PW TBD
SR-17 Provide training to relevant staff to be well versed on Vision Zero countermeasures

TBD PW TBD
SR-18 Provide input on projects that aligns Vision Zero goals TBD PW TBD Safe Speeds
SP-1 Conduct Vision Zero marketing that encompasses
speed management campaign
2025 PW TBD
SP-2 Share Neighborhood Traffic Management Program
(NTMP) ineligible study results and study data with
Mountain View’s SRTS Coordinator

TBD PW TBD
SP-3 Conduct high-visibility traffic enforcement on speed along the HIN
Ongoing PD TBD
SP-4 Implement speed limit reductions in accordance with AB 43
2025 PW Planning
SP-5 Track AB 645 automated enforcement pilot and
support state legislation to expand the permanent
program to all California cities
2025 CMO/PW Under Way
Safe Vehicles
VE-1 Conduct public education campaign on benefits of
pedestrian-friendly vehicles such as compact cars

TBD PW TBD
VE-2 Support free bicycle repair events 2024 PW Under Way Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 17 of 18 ends

ID Description Timeline Dept Status
VE-3 Provide education for decision makers on vehicle size and design impacts

TBD CMO/PW TBD
VE-4 Support state legislation for vehicle technology that addresses key crash factors

TBD CMO/PW TBD
Post-Crash Care
CC-1 Provide multilingual emergency response teams for
empathetic engagement with victims’ families

TBD FD/PD TBD
CC-2 Provide continuing education for emergency
responders to understand travel behavior, decisions
and lived experience of local pedestrians/bicyclists
TBD PD Under Way
CC-3 Establish protocols for best practice communications to encourage accurate and agency-based narratives in
media stories on crashes

TBD CMO/
PW/PD
Under Way
CC-4 Explore opportunities for acknowledgment and/or
remembrance program

TBD CMO/PD TBD
CC-5 Establish a rapid response crash team (MVRRT) to
examine factors associated with crashes on HIN and
potential solutions

TBD FD/PD/P
W
TBD
CC-6 Explore process to have fatal and serious injury crash reports shared with Traffic and Transportation staff
within 48 hours
2024 PD/PW Under Way
CC-7 Improve consistency of reporting for vehicle-
pedestrian and vehicle-bicycle crashes
2024 PD/PW Under Way
CC-8 Monitor collision data on a scheduled basis to
measure progress toward Vision Zero goals
Biannual PD/PW Under Way
CC-9 Conduct quarterly Vision Zero Working Group
meetings addressing recent activities, debriefing on
recent crashes, and progress toward goals
2024 PW+ Under Way
CC-10 Collect before-and-after data when infrastructure improvements are made to measure behavior change

TBD PW TBD

NEXT STEPS

Staff will evaluate and incorporate CTC feedback, revise the report, and bring the final report to the City Council in fall 2024 for consideration and adoption.

If Council adopts the Plan, staff will continue to work with multiple departments to implement next steps in relation to noninfrastructure recommendations. Staff will also apply for grants to design and construct infrastructure recommendations.

Vision Zero Action Plan and Local Road Safety Plan
June 4, 2024

Page 18 of 18 ends

CONCLUSION

The Draft Vision Zero Action Plan (VZAP)/Local Road Safety Plan (LRSP) responds to Council’s Vision Zero Policy, which aims to eliminate fatal traffic crashes in Mountain View by 2030. The plan was developed through a data-driven process involving crash and systemic safety analyses, with feedback from the Bicycle/Pedestrian Advisory Committee, stakeholders, and community members. Based on this process, the plan identifies seven safety corridors including: Rengstorff Avenue, Shoreline Boulevard, California Street, Ellis Street, El Monte Avenue, San Antonio Road, Middlefield Road, and Old Middlefield Way. The plan includes infrastructure recommendations to address these corridors and other priority roadway segments and intersections. The plan also includes noninfrastructure recommendations to provide additional direction in relation to safe road users, safe roads, safe speeds, safe vehicles, and post-crash care.

PA-RHL/LL/4/PWK
935-06-04-24M

Attachment: 1. Draft Vision Zero Action Plan and Local Road Safety Plan

cc: PWD(A), APWD(A)–Byrer, PCE–Gonzales, CTE