Cities Index.
ATT 2 - Project Plans

Mountain View City Council
December 17, 2024

Document
ATT 2 - Project Plans
Meeting
December 17, 2024
Body
Mountain View City Council
Original file
26.1 MB
Text extracted from the city's file for reading and search. Open the original on legistar1.granicus.com. That file is the official record.

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

A1.1
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
DATE
SHEET INDEX:

PROJECT TEAM INFO:

REVISIONS:

TITLE SHEET
DEVELOPER:

CRP Affordable Housing
and Community Development
4429 Morena Blvd., Suite A
San Diego, CA 92117
Contact: Jack Burlison
[email protected]
APPLICANT:

SMR Development
Phone: (406) 531-0401
Contact: Shellan Rodriguez
[email protected]
04/05/2024 SECOND PLANNING DEPARTMENT SUBMITTAL
3 06/13/2024 THIRD PLANNING DEPARTMENT SUBMITTAL
4 07/19/2024 FOURTH PLANNING DEPARTMENT SUBMITTAL
5 10/04/2024 FIFTH PLANNING DEPARTMENT SUBMITTAL
ARCHITECT:

Dahlin Group
5865 Owens Drive
Pleasanton, CA 94588
Phone: (925) 251-7200
Contact: Lauri Moffet-Fehlberg
[email protected]
CIVIL:

BKF Engineers
1730 N. First Street, Suite 600
San Jose, CA 95112
Phone: (408) 467-9100
Contact: Joey Bernardi
[email protected]
LANDSCAPE:
vanderToolen Associates
855 Bordeaux Way, Suite 240
Napa, CA 94558
Phone: (707) 224-2299
Contact: Phil vanderToolen
[email protected]
PROJECT DESCRIPTION:

The proposed project at 334 San Antonio Road is a 100-unit, affordable housing development located at the corner of San Antonio Road and California Street in Mountain View. The project will provide a mix of one, two, and three-bedroom apartment units in a C-shaped building that wraps around an at-grade secured courtyard. The courtyard fronts California Street, providing visibility between the private and public realm for connectivity to the neighborhood. It includes outdoor amenities, such as a play area and lounging spaces, and has direct connectivity to the community room so that activities can spill out from that space.

Consistent with the San Antonio Precise Plan, active indoor spaces, including the resident amenity areas lobbies, leasing offices, mail, and secured bike room have been located on the San Antonio Road frontage with storefront glazing to enhance the pedestrian environment. A taller plate height will be provided at the ground floor to further the sense of a commercial aesthetic. Entry canopies define each main entry, enhancing the pedestrian scale of building base. The two- and three-story plinth grounds the building through a change of plane and color blocking to further accentuate the sense of building base that relates to the pedestrian realm. At these levels, windows are recessed to further differentiate this plinth from the upper levels.

The building is five stories of Type IIIA construction over three stories of Type IA construction, for a total of 8 stories. The massing has been designed to give the building a sense of base, which balances out the height of the structure. All sides of the architecture will be articulated with changes in plane and color blocking.

A variety of parapet heights surround the flat roof and articulate the skyline, which is a style consistent with the neighborhood context and provides a place for solar and mechanical equipment to be concealed.

As the site falls within half of a mile of major transit, access to alternate means of transportation is very convenient for residents. A ground-level garage is provided on the west side of the building that will accommodate approximately 16 parking stalls. Vehicular access to the garage is proposed at the location of a current driveway entrance to the existing gas station on California Street. The building will also provide 100 secured bike storage spaces for the residents that will include charging capability for electric bikes and scooters. Outdoor guest bike parking will be provided.

The building will be designed to comply with the California Building Code including Chapter 11B insofar as it is applicable to this project. The project will be all electric, designed with solar PV, and will comply with all other applicable California Codes, including the California Energy Code, and the California Green Building Code. The project will also comply with the Mountain View Green Building Code and LEED intent.

As of August 2023, the site’s use is commercial. Onsite operations consist of the sale of fuel and convenience store items and auto repair with asphalt-paved parking areas, concrete-paved parking areas, limited landscaping, and one fuel canopy, four fuel islands, and eight pump dispensers. The subject property is currently occupied by Valero for commercial use.

Hours of operation for the convenience store are 5:40am-11:00pm daily; the auto shop is open 8:00am-6:00pm Monday through Saturday and is closed on Sundays. Currently, there are four active underground storage tanks (USTs) located on the eastern portion of the subject property that will be excavated prior to construction.

Sidewalks and streets surrounding the site will be revised per City standards as shown in the drawing set. For more information on offsite improvements, please refer to the Civil sheets.

There are no requested approvals under the Subdivision Map Act, including, but not limited to, a parcel map, or a condominium map.

A1.1

TITLE SHEET
L-1 LANDSCAPE PLAN
A1.2 PERSPECTIVE VIEW: SAN ANTONIO ROAD (EAST) ELEVATION A1.3 PERSPECTIVE VIEW: VIEW OF SOUTH ELEVATION FROM SAN ANTONIO ROAD A1.4 PERSPECTIVE VIEW: CALIFORNIA STREET (NORTH) ELEVATION A1.5 PERSPECTIVE VIEW: STREETSCAPE ALONG SAN ANTONIO ROAD A1.6 PERSPECTIVE VIEW: AERIAL
A1.7 ARCHITECTURAL SITE PLAN
A2.1 GROUND FLOOR PLAN
A2.2 SECOND AND THIRD FLOOR PLANS
A2.3 FOURTH FLOOR PLAN
A2.4 FIFTH THROUGH SEVENTH FLOOR PLAN
A2.5 EIGHTH FLOOR PLAN
A2.6 ROOF PLAN
A2.7 TYPICAL UNIT PLANS
A3.1 ARCHITECTURAL CHARACTER AND MASSING SKETCHES
A3.2 BUILDING ELEVATIONS
A3.3 BUILDING ELEVATIONS
A3.4 BUILDING COURTYARD ELEVATIONS
A3.5 BUILDING COURTYARD ELEVATIONS
A3.6 BUILDING COURTYARD ELEVATIONS
A3.7 BUILDING ELEVATIONS
A3.8 BUILDING ELEVATIONS
A3.9 COLORS & MATERIALS
A4.1 STREETSCAPE ELEVATIONS
A4.2 BUILDING SECTION
A4.3 TYPICAL WALL SECTION
A5.1 TYPICAL DETAILS
A5.2 TYPICAL DETAILS
A5.3 TYPICAL DETAILS
A5.4 TYPICAL DETAILS
A5.5 PROPOSED MAILBOXES & PARCEL LOCKERS
A5.6 PROPOSED BIKE RACKS
A6.1 PROJECT DATA SUMMARY
A6.2 VICINITY MAPS
A6.3 NEIGHBORHOOD CONTEXT
A6.4 SHADOW STUDIES
A6.5 CIRCULATION DIAGRAM
A6.6 ZONING CALCULATIONS & DIAGRAM
A6.7 FAR DIAGRAM
L-2 COURTYARD ENLARGEMENT PLAN
L-3 PRELIMINARY PLANTING PLAN
L-4 PRELIMINARY TREE AND CANOPY PLAN
L-5 SITE IMAGERY
L-6 IRRIGATION HYDROZONE PLAN
L-7 TYPICAL IRRIGATION DETAILS
L-8 PRELIMINARY LIGHTING PLAN
C1.0 EXISTING CONDITIONS
C2.0 PRELIMINARY CIVIL SITE PLAN
C3.0 PRELIMINARY GRADING & DRAINAGE PLAN
C4.0 PRELIMINARY UTILITY PLAN
C5.0 STORMWATER CONTROL PLAN
C6.0 FIRE ACCESS PLAN
A7.1 GROUND FLOOR EGRESS PLAN
A7.2 TYPICAL SECOND TO EIGHTH FLOOR EGRESS PLAN
E1.00 SITE LIGHTING
E1.01 SITE PHOTOMETRICS
E1.02 SITE LIGHTING DETAILS
TR0.1 FLOOR PLAN LEVEL 1
TR0.2 FLOOR PLAN LEVEL 2
TR1.0 RESIDENTIAL TRASH
TR1.1 RESIDENTIAL GROUND FLOOR TRASH
TR1.2 PULLOUT SERVICE BY HAULER
TR1.3 TRASH STAGING LAYOUT ON SERVICE DAYS
TR2.0 UPPER VESTIBULE SECTION VIEWS (TYP)
334 SAN ANTONIO ROAD MOUNTAIN VIEW, CA

FORMAL PLANNING APPLICATION
California St
California StMiller Ave
San Antonio Rd
PROJECT LOCATION:
334 SAN ANTONIO ROAD

VICINITY MAP
5 Attachment 2
31'-0"
15'-0" MIN. 20'-0"

ENTRY WITH
ACCENT

PLANTING

AND BENCH
ENTRY

CALIFORNIA STREET

SAN ANTONIO ROAD

OUTDOOR COURTYARD
SEE SHEET L-2
Copyright 2024 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates.

L-1
Project No. 05123NORTH

LANDSCAPE PLAN

CONCEPTUAL PHASE
OCTOBER 4, 2024
vanderToolen Associates
700 Ygnacio Valley Rd.

Suite 100
Walnut Creek, CA 94596
tel+ 925.274.1305
hhhvandertoolenco^SCALE: 1" = 10'-0"
0'5'10'20'
Mountain View, California
334 SAN ANTONIO ROAD

PROPERTY LINE

BIORETENTION
AREA

FIRE ACCESS PATH BIORETENTION AREA

FENCE AND GATE

SIGHT DISTANCE

TRIANGLE

PROPERTY LINE

COURTYARD
ACCESS

COURTYARD
ACCESS

PLANTER STRIP

PROPOSED TREE LEGEND

TREESBOTANICAL NAMECONTWATER USE QTY

COMMON NAME
ACER PLATANOIDES 'CRIMSON SENTRY' 24"BOXMOD3

CRIMSON SENTRY NORWAY MAPLE
ACER RUBRUM 'OCTOBER GLORY'36"BOX MOD 4

RED MAPLE
ACER X FREEMANII `JEFFERSRED`36"BOXMOD3
AUTUMN BLAZE® FREEMAN MAPLE
CERCIS CANADENSIS TEXENSIS 'OKLAHOMA' 24"BOXMOD3

OKLAHOMA TEXAS REDBUD
PRUNUS CAROLINIANA 'COMPACTA'15 GALLOW16

COMPACT CAROLINA LAUREL CHERRY
TILIA TOMENTOSA 'STERLING'48"BOXLOW1

STERLING SILVER LINDEN

EXISTING TREEN/AN/A

SETBACK NOTES
TYPICAL TREE SETBACKS;
·5'-0" FROM WATER METERS AND JOINT TRENCH
·10'-0" FROM SANITARY SEWER LINES
·15'-0" FROM STREETLIGHT

LIGHT BOLLARD
SEE SHEET L-8
#

PROPOSED SHRUB LEGEND
SHRUBS

SYMBOLBOTANICAL NAMECOMMON NAMESIZE
WATER
USE

NATIVE/

ADAPTIVEQTY
AZALEA RUTHERFORDIANA 'ALASKA' ALASKA AZALEA5 GAL MOD ADAPTIVE 8 CAREX TUMULICOLABERKELEY SEDGE1 GAL LOW NATIVE 250

CARPENTERIA CALIFORNICA
'ELIZABETH'BUSH ANEMONE5 GAL MOD NATIVE5
CHONDROPETALUM ELEPHANTINUM LARGE CAPE RUSH5 GAL LOW ADAPTIVE36 CHONDROPETALUM TECTORUM SMALL CAPE RUSH5 GAL LOW ADAPTIVE18 DIANELLA TASMANICA 'VARIEGATA' VARIEGATED FLAX LILY 5 GAL MOD ADAPTIVE29

GALVEZIA SPECIOSA 'FIRECRACKER'FIRECRACKER ISLAND
SNAPDRAGON5 GAL LOW NATIVE15
HEUCHERA MAXIMAISLAND ALUM ROOT1 GAL MOD NATIVE91
JUNCUS PATENS 'ELK BLUE'CALIFORNIA GRAY RUSH 1 GAL LOW NATIVE111

LIRIOPE MUSCARI 'SILVERY SUNPROOF'SILVERY SUNPROOF
LILYTURF1 GAL MOD ADAPTIVE58
PODOCARPUS MACROPHYLLUS `MAKI`MAKI SHRUBBY YEW
PODOCARPUS15 GAL MOD ADAPTIVE12
POLYSTICHUM MUNITUMWESTERN SWORD FERN 5 GAL MOD NATIVE27

SARCOCOCCA HOOKERIANA HUMILIS
'FRAGRANT MOUNTAIN'

FRAGANT MOUNTAIN
SWEETBOX5 GAL LOW ADAPTIVE9
WOODWARDIA FIMBRIATAGIANT CHAIN FERN5 GAL MOD NATIVE22
TOTAL NATIVE PLANTINGS 75%
5 HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002JOB NO.

DATE
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT

07.19.2024
N
A1.2
PERSPECTIVE VIEW:

SAN ANTONIO ROAD
(EAST) ELEVATION
NOT TO SCALE (N.T.S.)
N

CALIFORNIA STREET

SAN ANTONIO ROAD

KEYPLAN

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A1.3
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N
PERSPECTIVE VIEW:

VIEW OF SOUTH

ELEVATION FROM

SAN ANTONIO ROAD
NOT TO SCALE (N.T.S.)
N

CALIFORNIA STREET

SAN ANTONIO ROAD

KEYPLAN

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A1.4
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N
PERSPECTIVE VIEW:

CALIFORNIA STREET
(NORTH) ELEVATION

CALIFORNIA STREET

SAN ANTONIO ROAD

KEYPLAN
NOT TO SCALE (N.T.S.)
N

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A1.5
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N
PERSPECTIVE VIEW:

STREETSCAPE

ALONG SAN

ANTONIO ROAD

CALIFORNIA STREET

SAN ANTONIO ROAD

KEYPLAN

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A1.6
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
PERSPECTIVE VIEW:

AERIAL

SAN ANTONIO ROAD

CALIFORNIA STREET
NOT TO SCALE (N.T.S.)
ENTRY
LOBBY
OFFICE
119 SF
OFFICE
189 SF
BOILER
MPOE
DOM. PUMP

JANITOR
TRASH
1BD UNIT
ELEC.

E.EQ.

FIRE
PUMP
ERRCS
ENTRY

MAINTENANCE

WORKSPACE/

COMPUTER LAB

MAIL/PARCEL
IDF
RR
RR
GARAGE
16 ASSIGNED RESIDENTIAL

CAR PARKING SPACES

ALL STALLS NOT MARKED AS
"EVCS EQUIPPED" TO BE

EV CAPABLE
UP

COMMUNITY
SPACE
750 SQ FT

RESERVED FOR

RIDESHARE

PICK-UP/DROP-OFF
BIKE
ROOM
892 SF
100 BIKES
DN
DN
UP

VAN ACCESSIBLE SPACE
LEVEL 2 EVSE (EV2)
LEVEL 3 EVSE (EV3)
LEVEL 2 EVSE (EV2)

GARAGE GATE, SEE
SHEET A5.2 FOR DETAILS

TRANSFORMER

PEDESTRIAN

TRIANGLE

OF SAFETY

TRAFFIC SAFETY

VISIBILITY AREA

SEE TR SERIES SHEETS

FOR MORE DETAILED

INFORMATION
3BD UNIT
TRASH
ROOM

SHORT-TERM EXTERIOR BIKE
RACKS - 14 BIKES
GARDEN
LOBBY

EVCS SERVED BY
INSTALLED LEVEL 2
EVSE (EV2)

EVCS SERVED BY
INSTALLED LEVEL 2
EVSE (EV2)

EVCS SERVED BY INSTALLED
LEVEL 2 EVSE (EV2) AND
INSTALLED LEVEL 3 EVSE (EV3)
(ACCOMMODATES VAN

ACCESSIBILITY)

EVCS SERVED BY INSTALLED
LEVEL 2 EVSE (EV2) AND
INSTALLED LEVEL 3 EVSE (EV3)
2 MOTORCYCLE
SPACES
GUARD RAIL - 3'-0" MAX.
12'-6"
6'-0"

SETBACK
10'-4"

SETBACK
20'-5"
60'-0"

ROAD CENTERLINE TO PROPERTY LINE
5'-0"
FUTURE
P.A.E.
5'-0"
FUTURE
P.A.E.
65'-0"
R.O.W.
15'-9"

PROPOSED

CALIFORNIA STREET

BUILDING FRONTAGE

SETBACK
5'-0"
FUTURE
P.A.E.
& E.A.S.
39'-6"
R.O.W.
19'-8 1/2"
6'-5"

EXTERIOR
ACTIVE
SPACE
20'-1"

GATE TO BACK OF WALK
24'-0"

REQUIRED CALIFORNIA STREET

BUILDING FRONTAGE SETBACK

PER SAPP
18'-0"

REQUIRED SAN ANTONIO ROAD

BUILDING FRONTAGE SETBACK

PER SAPP
29'-4"
19'-6"

PROPOSED SAN ANTONIO ROAD

BUILDING FRONTAGE SETBACK
4'-6"
FUTURE
P.A.E.
35'-0"

ROAD CENTERLINE TO PROPERTY LINE
6'-0"
WALK
ZONE
5'-0"

EXTERIOR
ACTIVE
SPACE
8'-0"

WALK ZONE
6'-0"

BIKE LANE
11'-11"

TRAVEL LANE
11'-4"

TRAVEL LANE
11'-8"

TRAVEL LANE
3'-10"
MEDIAN
4'-0"

PLANTER
ZONE
6'-0"

BIKE LANE
5 5
5 SAN ANTONIO ROAD

CALIFORNIA STREET
BUILDING UNIT MIX:
1 BD: 36 UNITS
2 BD: 28 UNITS
3 BD: 36 UNITS
TOTAL: 100 UNITS

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A1.7
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

ARCHITECTURAL

SITE PLAN

COMMON USABLE

OPEN SPACE
+/- 3,556 SF

SEE LANDSCAPE SHEETS FOR

MORE INFORMATION
LEGEND:

REQUIRED BUILDING

FRONTAGE

SETBACKS PER
SAPP
3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE
3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE
2CY NARROW

LOOSE FRONT

LOAD BIN

CONTAINER

RECYCLING
3CY NARROW

LOOSE FRONT

LOAD BIN
PAPER

RECYCLING
2CY NARROW

LOOSE FRONT

LOAD BIN

CONTAINER

RECYCLING
MC
P W
64G CART

COMPOST
64G CART

COMPOST
3CY NARROW

LOOSE FRONT

LOAD BIN
PAPER

RECYCLING
8FT ROLL UP DOOR WITH

KEYPAD ACCESS
64G CART

COMPOST
64G CART

COMPOST
PAPER

RECYCLING
WASTE

CONTAINER

RECYCLING
3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE
ENTRY
LOBBY
OFFICE
119 SF
OFFICE
189 SF
BOILER
MPOE
DOM. PUMP

JANITOR
TRASH
1BD UNIT
19'-0"

TYPICAL
24'-0"

DRIVE AISLE
8'-6"
8'-6"
12'-3"
22'-2"
10'-8 1/2"
9'-7"
181'-7 1/2"
26'-1 1/2"
15'-7"
18'-0"
16'-5 1/2"
21'-5 1/2"
11'-6 1/2"
18'-3"
8'-5 1/2"
3'-0"
6'-7 1/2"
22'-3 1/2"
33'-11 1/2"
1'-4"
3'-2"
1'-4"
19'-9 1/2"
7'-7"
22'-9"
10'-0"
10'-9 1/2"
21'-7 1/2"
5'-8 1/2"
ELEC.

E.EQ.

FIRE
PUMP
ERRCS
ENTRY

MAINTENANCE

WORKSPACE/

COMPUTER LAB

MAIL/PARCEL
IDF
RR
RR
GARAGE
16 ASSIGNED RESIDENTIAL

CAR PARKING SPACES

ALL STALLS NOT MARKED AS
"EVCS EQUIPPED" TO BE

EV CAPABLE
UP

COMMUNITY
SPACE
750 SQ FT
9'-0"

TYPICAL
8'-6"
8'-9 1/2"
10'-0"
10'-0"
8'-6"
4'-8"
11'-7"
10'-6"
23'-4"
10'-10"
22'-2 1/2"
18'-2 1/2"
25'-7"
10'-7"
3'-3"
1'-6"
24'-10"
3'-3"
4'-2"
86'-11 1/2"
4'-6 1/2"
9'-4 1/2"
24'-5 1/2"
22'-4 1/2"
24'-6 1/2"
14'-5"
8'-7 1/2"
6'-6"
5'-0"

RESERVED FOR

RIDESHARE

PICK-UP/DROP-OFF
BIKE
ROOM
892 SF
100 BIKES
DN
DN
53'-2 1/2"
40'-3 1/2"
UP
8'-8"
66'-6"
123'-4"
2'-3"
2'-1 1/2"
9'-3 1/2"
3'-9 1/2"
3'-6"
7'-5"
10'-3 1/2"
56'-1"
15'-10"
3'-5"

VAN ACCESSIBLE SPACE
4'-3"
4'-7 1/2"
5'-7"
6'-11"
5'-0"
67'-9"
8'-9 1/2"
12'-9 1/2"
12'-2 1/2"
13'-3 1/2"
10'-6"
5'-11 1/2"
8'-2"
9'-0"
5'-3"
39'-3"
22'-1 1/2"
22'-1 1/2"
32'-5"
20'-11"
24'-9 1/2"
14'-4 1/2"
7'-10"
8'-4 1/2"
LEVEL 2 EVSE (EV2)
LEVEL 3 EVSE (EV3)
LEVEL 2 EVSE (EV2)

GARAGE GATE, SEE
SHEET A5.2 FOR DETAILS

SEE TR SERIES SHEETS

FOR MORE DETAILED

INFORMATION
3BD UNIT
TRASH
ROOM
GARDEN
LOBBY
12'-10"
4'-4"
9'-8"
9'-10 1/2"
9'-8"
3'-7"
16'-0"
3'-7"
9'-5 1/2"
105'-7"
6'-2 1/2"
6'-6"
11'-5"
1'-0"
1'-5 1/2"
21'-0"
18'-0"
8'-0"
ACCESS
AISLE
9'-0"
VAN

ACCESSIBLE
SPACE
8'-0"
ACCESS
AISLE
9'-0"
9'-0"
9'-0"

EVCS SERVED BY
INSTALLED LEVEL 2
EVSE (EV2)

EVCS SERVED BY
INSTALLED LEVEL 2
EVSE (EV2)

EVCS SERVED BY INSTALLED
LEVEL 2 EVSE (EV2) AND
INSTALLED LEVEL 3 EVSE (EV3)
(ACCOMMODATES VAN

ACCESSIBILITY)

EVCS SERVED BY INSTALLED
LEVEL 2 EVSE (EV2) AND
INSTALLED LEVEL 3 EVSE (EV3)
6'-7"
4'-4"
10'-0"
2 MOTORCYCLE
SPACES
5 5

SAN ANTONIO ROAD

CALIFORNIA STREET

GROUND FLOOR

UNIT MIX
1 BD: 1 UNIT
2 BD: 0 UNITS
3 BD: 1 UNIT
TOTAL: 2 UNITS

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A2.1
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

GROUND FLOOR
PLAN

COMMON USABLE

OPEN SPACE
+/- 3,556 SF

SEE LANDSCAPE SHEETS FOR

MORE INFORMATION

SAN ANTONIO ROAD

CALIFORNIA STREET
3BD UNIT
UP
DN
D
W/D
W/D
11'-10 1/2"
10'-6 1/2"
10'-9"
12'-8"
21'-10 1/2"
22'-8"
4'-1"
26'-6"
7'-9"
23'-1"
10'-7"
30'-2"
25'-8"
121'-1"
2'-9"
15'-6 1/2"
9'-8"
11'-5"
10'-7"
23'-2 1/2"
9'-4 1/2"
21'-6 1/2"
10'-11"
9'-5 1/2"
20'-3 1/2"
60'-0 1/2"
LAUNDRY FL.2 &
FLEX FL.3
ROOF
BELOW
ROOF
BELOW
IDF
JAN
1BD UNIT
2BD UNIT
2BD UNIT
2BD UNIT
2BD UNIT
1BD UNIT
1BD UNIT
3BD UNIT
1BD UNIT
3BD UNIT
W
W/D
W/D
W/D
23'-0"
10'-8 1/2"
9'-6 1/2"
10'-3"
176'-11 1/2"
14'-4 1/2"
13'-11 1/2"
23'-8"
9'-5 1/2"
23'-7"
12'-2"
23'-9 1/2"
86'-10 1/2"
20'-8 1/2"
22'-8"
11'-0 1/2"
2'-6"
5'-0"
5'-0"
3'-0"
6'-7 1/2"
22'-3 1/2"
3'-3"
7'-6"
TRASH
CHUTES

SEE TR SERIES SHEETS FOR MORE

DETAILED INFORMATION
DN
UP
97'-10 1/2"
67'-9"
8'-4 1/2"
9'-11"
9'-2"
55'-6 1/2"
20'-4 1/2"
5'-0"
8'-5"
20'-11"
PANTRY
3BD UNIT
1BD UNIT
3BD UNIT
10'-1 1/2"
12'-3 1/2"
5'-0"
6'-6"
4'-8"
5'-0" ADA

TURN CIRCLE
PAPER

RECYCLING
WASTE

CONTAINER

RECYCLING

COMPOST

CARDBOARD

SECOND & THIRD

FLOOR UNIT MIX
1 BD: 5 UNITS
2 BD: 4 UNITS
3 BD: 5 UNITS
TOTAL: 14 UNITS

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A2.2
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

SECOND AND THIRD

FLOOR PLANS

FOURTH FLOOR

UNIT MIX
1 BD: 5 UNITS
2 BD: 4 UNITS
3 BD: 5 UNITS
TOTAL: 14 UNITS

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A2.3
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

FOURTH FLOOR PLAN

SAN ANTONIO ROAD

CALIFORNIA STREET

LAUNDRY
ROOF
BELOW
IDF
3BD UNIT
1BD UNIT
3BD UNIT
2BD UNIT
1BD UNIT
3BD UNIT
1BD UNIT
3BD UNIT
UP
DN
D
W
W/D
W/D
21'-9 1/2"
10'-11"
11'-4 1/2"
22'-2 1/2"
5'-0"
25'-0"
175'-5 1/2"
11'-1"
11'-3 1/2"
21'-11 1/2"
11'-4"
32'-8 1/2"
11'-3 1/2"
10'-11"
9'-10"
120'-5"
13'-11 1/2"
3'-0"
11'-3 1/2"
10'-11"
11'-0 1/2"
22'-0 1/2"
10'-1"
11'-10 1/2"
22'-0 1/2"
10'-7"
86'-10 1/2"
20'-3"
22'-5 1/2"
21'-9"
6'-6"
5'-0"
ROOF
BELOW
JAN
1BD UNIT
2BD UNIT
3BD UNIT
2BD UNIT
1BD UNIT
W/D
W/D
W/D
11'-5"
11'-9"
11'-3 1/2"
10'-11"
22'-6"
11'-3 1/2"
32'-8 1/2"
11'-3 1/2"
10'-11"
9'-10"
20'-3 1/2"
15'-6 1/2"
22'-3 1/2"
6'-7 1/2"
20'-4 1/2"
22'-5 1/2"
11'-5"
11'-10 1/2"
22'-0 1/2"
11'-6"
10'-11"
5'-0"
5'-0"
59'-0"
23'-7"
DN
UP
DN
1'-8 1/2"
2'-8 1/2"
97'-9 1/2"
55'-0"
9'-11"
11'-10"
8'-10 1/2"
9'-2"
67'-9"
4'-10 1/2"
5'-0"
20'-11"
8'-5 1/2"
7'-6"
TRASH
CHUTES

SEE TR SERIES SHEETS FOR MORE

DETAILED INFORMATION
5'-0" ADA

TURN CIRCLE
PAPER

RECYCLING
WASTE

CONTAINER

RECYCLING

COMPOST

CARDBOARD
2BD UNIT
334 SAN ANTONIO ROAD, MOUNTAINVIEW

PROJECT CLIENT

CRP AFFORDABLE
JOB NO.
1648.002
05-02-2023
DATE
5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
0 32
16 8
SCALE 1/8" = 1'-0"
0 16
8 4

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A2.4
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

FIFTH THROUGH

SEVENTH FLOOR
PLAN

SAN ANTONIO ROAD

CALIFORNIA STREET
ROOF
BELOW
IDF
JAN
1BD UNIT
2BD UNIT
2BD UNIT
1BD UNIT
1BD UNIT
21'-9 1/2"
11'-3 1/2"
11'-4 1/2"
25'-0"
175'-5 1/2"
11'-1"
21'-11 1/2"
11'-4"
11'-3 1/2"
9'-10"
1'-8 1/2"
20'-3 1/2"
7'-6"
13'-11 1/2"
6'-7 1/2"
3'-0"
22'-6"
10'-11"
11'-1"
22'-0 1/2"
11'-10 1/2"
22'-0 1/2"
86'-10 1/2"
10'-11"
5'-0"
5'-0"
ROOF
BELOW
2BD UNIT
3BD UNIT
2BD UNIT
1BD UNIT
3BD UNIT
3BD UNIT
1BD UNIT
3BD UNIT
3BD UNIT
DN
11'-5"
11'-9"
11'-3 1/2"
10'-11"
22'-6"
10'-11"
22'-2 1/2"
5'-0"
11'-3 1/2"
32'-8 1/2"
10'-11"
120'-5"
15'-6 1/2"
11'-3 1/2"
10'-1"
23'-7"
11'-5"
10'-7"
20'-3"
22'-5 1/2"
21'-9"
11'-6"
5'-0"
6'-6"
59'-0"
DN
DN
UP
2'-8 1/2"
9'-11"
97'-9 1/2"
24'-3 1/2"
79'-11"
8'-10 1/2"
20'-11"
5'-0"
9'-2"
8'-5 1/2"
22'-3 1/2"
20'-4 1/2"
55'-0"
TRASH
CHUTES

SEE TR SERIES SHEETS FOR MORE

DETAILED INFORMATION
5'-0" ADA

TURN CIRCLE
PAPER

RECYCLING
WASTE

CONTAINER

RECYCLING

COMPOST

CARDBOARD
2BD UNIT
334 SAN ANTONIO ROAD, MOUNTAINVIEW

PROJECT CLIENT

CRP AFFORDABLE
JOB NO.
1648.002
05-02-2023
DATE
5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
0 32
16 8
SCALE 1/8" = 1'-0"
0 16
8 4

FIFTH THROUGH

SEVENTH FLOOR

UNIT MIX
1 BD: 5 UNITS
2 BD: 4 UNITS
3 BD: 5 UNITS
TOTAL: 14 UNITS

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A2.5
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

EIGHTH FLOOR
PLAN

SAN ANTONIO ROAD

CALIFORNIA STREET
ROOF
BELOW
IDF
JAN
1BD UNIT
2BD UNIT
2BD UNIT
1BD UNIT
1BD UNIT
44'-0"
11'-5 1/2"
25'-0"
175'-5 1/2"
11'-1"
21'-11 1/2"
11'-4"
9'-10"
1'-8 1/2"
20'-3 1/2"
21'-5 1/2"
11'-10 1/2"
22'-0 1/2"
86'-10 1/2"
10'-11"
5'-0"
5'-0"
ROOF
BELOW
2BD UNIT
1BD UNIT
1BD UNIT
3BD UNIT
DN
11'-5"
11'-9"
44'-8 1/2"
27'-2 1/2"
11'-3 1/2"
54'-11"
120'-5"
15'-6 1/2"
10'-1"
23'-7"
11'-5"
10'-7"
20'-3"
22'-5"
21'-9"
11'-6 1/2"
5'-0"
6'-6"
59'-0"
DN
DN
UP
9'-11"
97'-9 1/2"
24'-3 1/2"
79'-11"
8'-10 1/2"
20'-11"
5'-0"
9'-2"
9'-5 1/2"
3BD UNIT
3BD UNIT
3BD UNIT
77'-9 1/2"
3BD UNIT
2BD UNIT
TRASH
CHUTES

SEE TR SERIES SHEETS FOR MORE

DETAILED INFORMATION
5'-0" ADA

TURN CIRCLE
PAPER

RECYCLING
WASTE

CONTAINER

RECYCLING

COMPOST

CARDBOARD
31'-11"
2'-8 1/2"
55'-0"
20'-4 1/2"

EIGHTH FLOOR UNIT
MIX
1 BD: 5 UNITS
2 BD: 4 UNITS
3 BD: 5 UNITS
TOTAL: 14 UNITS

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A2.6
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

ROOF PLAN
2'-0"
TYP.
10"
ROOF PLAN KEYNOTE LEGEND:

1. FLAT ROOF, TYP. - SLOPE 1/2”
PER FOOT MINIMUM TO DRAIN.

DIRECTION OF SLOPE
REPRESENTED GRAPHICALLY.

2. METAL RAILING, TYP.

3. METAL PARAPET CAP,
TYP.

4. HATCH ROOF ACCESS

5. ROOF DRAIN, TYP. - FINAL LOCATION

AND NUMBER TBD

6. MECHANICAL UNIT, TYP. - FINAL

LOCATION AND NUMBER TBD,

TYPICAL DISTANCE FROM PARAPET

WALL SHOWN

7. TRASH CHUTE VENT
NOTES:

1. ROOF PLAN IS CONCEPTUAL.

ADDITIONAL TIE-BACKS AND

PENETRATION LOCATIONS WILL

BE DETERMINED AS THE PROJECT

PROGRESSES TOWARD BUILDING
PERMITS.

2. EXACT EQUIPMENT MODELS AND

HEIGHTS WILL BE DETERMINED

AS THE PROJECT

PROGRESSES
TOWARD BUILDING PERMITS.

3. PARAPETS WILL BE UTILIZED TO

SCREEN THE EQUIPMENT
.

4. THE SOLAR PV SYSTEM WILL BE

DESIGNED BY A PV ENGINEER AND
FINAL

LOCATIONS AND NUMBERS OF

PANELS WILL BE DETERMINED AS THE

PROJECT PROGRESSES TOWARD
BUILDING PERMITS; THE SYSTEM

WILL BE DESIGNED TO COMPLY WITH
BUILDING CODE.

5. THE ROOF AREA

PROVIDED FOR

PV SHOULD BE SUFFICIENT TO

COMPLY WITH CITY OF MOUNTAIN
VIEW REACH CODE MVCC 8.20.9 AND
TABLE 101.10 WHICH REQUIRES PV

INSTALLATION ON THE ROOF AREA

TO ACCOMMODATE ALL-ELECTRIC
BUILDING TO 100% OF ANNUAL KWH

CONSUMPTION OFFSET

POTENTIAL SOLAR PV AREA
#
74 COURTYARD AT
GRADE
1 2
3 5
6 2'-0"
TYP.

TYPICAL 1-BEDROOM UNIT
1 BED/1 BATH
GROSS AREA: 499 SF
NET AREA: 463 SF
TYPICAL 2-BEDROOM UNIT
2 BED/1 BATH
GROSS AREA: 763 SF
NET AREA: 718 SF
TYPICAL 3-BEDROOM UNIT
2 BED/1 BATH
GROSS AREA: 1018 SF
NET AREA: 959 SF

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A2.7
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT

TYPICAL UNIT PLANS
SQUARE FOOTAGE CALCULATIONS1:

UNIT GROSS SQ. FT. IS MEASURED TO

THE OUTSIDE FACE OF PERIMETER
STUDS. CHASES ARE EXCLUDED

2. UNIT NET SQ. FT. IS MEASURED TO
THE INSIDE FACE OF GYPSUM BOARD.

CHASES ARE EXCLUDED

2. 1. SQUARE FOOTAGES MAY VARY

SLIGHTLY FOR CONSTRUCTION
DOCUMENTS.

2. CHASES ARE INCLUDED IN BUILDING

UTILITY AREAS, SEE CHART
"GROSS BUILDING AREAS BY
SPACE
TYPE" ON SHEET A6.1.
5 12'-1 1/2"
1'-0"
9'-1"
1'-0"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
+/- 1"

TOP OF CURB TO TOP OF FINISH FLOOR
+/- 83'-9 1/2"
FROM FINISH GRADE AT SOUTHEAST CORNER OF SITE TO TOP OF AVERAGE ROOF SURFACE, NOT TO EXCEED 85'-0" 11'-2"
1'-0"
9'-1"
1'-0"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
+/- 84'-8 1/2"
FROM FINISH GRADE AT NORTHEAST CORNER OF SITE TO TOP OF AVERAGE ROOF SURFACE, NOT TO EXCEED 85'-0" +/- 1/2"

TOP OF CURB TO TOP OF FINISH FLOOR

EIGHTH FLOOR

SEVENTH FLOOR

SIXTH FLOOR

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

AVERAGE ROOF

SURFACE

EIGHTH FLOOR

SEVENTH FLOOR

SIXTH FLOOR

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

AVERAGE ROOF

SURFACE

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A3.2
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

CALIFORNIA STREET

SAN ANTONIO ROAD

KEYPLAN

BUILDING

ELEVATIONS
1 BUILDING ELEVATION - SAN ANTONIO ROAD
1 N
ELEVATION KEYNOTE LEGEND:

1. PAINTED METAL

FLASHING CAP

2. METAL GUARD RAIL

3. PAINTED STUCCO WITH

CONTROL JOINTS, TYPICAL

4. DARK BRONZE ANODIZED
VINYL

FRAME WINDOW BY PLY GEM
(OR SIMILAR), TYPICAL

5. DARK BRONZE ANODIZED

STOREFRONT

BY KAWNEER (OR

SIMILAR) TYPICAL

6. PAINTED MECHANICAL LOUVER

7. PAINTED METAL

CANOPY AT

PROJECT ENTRY

8. PAINTED DOOR

9. METAL ROLL-UP
DOOR

10. METAL GRATE

11. PROJECT SIGNAGE

12. LIGHT FIXTURE, SEE

ELECTRICAL DRAWINGS
#
11 3 333 3 15 127 64
+/- 1/2"

TOP OF CURB TO TOP OF FINISH FLOOR
85'-0"
FROM TOP OF CURB AT NORTHWEST CORNER OF SITE TO TOP OF AVERAGE ROOF SURFACE, NOT TO EXCEED 85'-0" +/- 84'-8 1/2"
FROM TOP OF CURB AT NORTHEAST CORNER OF SITE TO TOP OF AVERAGE ROOF SURFACE, NOT TO EXCEED 85'-0" +/- 94'-8"
FROM FINISH GRADE AT NORTHWEST CORNER OF SITE TO TOP OF ROOF AT STAIR PENTHOUSE, NOT TO EXCEED 95'-0" 1'-0"
9'-1"
1'-0"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"12'-1 1/2"
+/- 1/2"

TOP OF CURB TO TOP OF FINISH FLOOR
12'-5"
1'-0"
9'-1"
1'-0"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"

EIGHTH FLOOR

SEVENTH FLOOR

SIXTH FLOOR

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

AVERAGE ROOF

SURFACE

EIGHTH FLOOR

SEVENTH FLOOR

SIXTH FLOOR

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

AVERAGE ROOF

SURFACE

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A3.3
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

BUILDING

ELEVATIONS
N
12 9 97 41 3 33 3 35 811

CALIFORNIA STREET

SAN ANTONIO ROAD

KEYPLAN
2 ELEVATION KEYNOTE LEGEND:

1. PAINTED METAL

FLASHING CAP

2. METAL GUARD RAIL

3. PAINTED STUCCO WITH

CONTROL JOINTS, TYPICAL

4. DARK BRONZE ANODIZED
VINYL

FRAME WINDOW BY PLY GEM
(OR SIMILAR), TYPICAL

5. DARK BRONZE ANODIZED

STOREFRONT

BY KAWNEER (OR

SIMILAR) TYPICAL

6. PAINTED MECHANICAL LOUVER

7. PAINTED METAL

CANOPY AT

PROJECT ENTRY

8. PAINTED DOOR

9. METAL ROLL-UP
DOOR

10. METAL GRATE

11. PROJECT SIGNAGE

12. LIGHT FIXTURE, SEE

ELECTRICAL DRAWINGS
#
2 BUILDING ELEVATION - CALIFORNIA STREET

12'-1 1/2"
1'-0"
9'-1"
1'-0"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
+/- 84'-8 1/2"
FROM FINISH GRADE AT NORTHEAST CORNER OF SITE TO TOP OF AVERAGE ROOF SURFACE, NOT TO EXCEED 85'-0"

EIGHTH FLOOR

SEVENTH FLOOR

SIXTH FLOOR

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

AVERAGE ROOF

SURFACE
+/- 1"

TOP OF CURB TO TOP OF FINISH FLOOR

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A3.4
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

BUILDING

COURTYARD

ELEVATIONS
3 1 325 46127 333
ELEVATION KEYNOTE LEGEND:

1. PAINTED METAL

FLASHING CAP

2. METAL GUARD RAIL

3. PAINTED STUCCO WITH

CONTROL JOINTS, TYPICAL

4. DARK BRONZE ANODIZED
VINYL

FRAME WINDOW BY PLY GEM
(OR SIMILAR), TYPICAL

5. DARK BRONZE ANODIZED

STOREFRONT

BY KAWNEER (OR

SIMILAR) TYPICAL

6. PAINTED MECHANICAL LOUVER

7. PAINTED METAL

CANOPY AT

PROJECT ENTRY

8. PAINTED DOOR

9. METAL ROLL-UP
DOOR

10. METAL GRATE

11. PROJECT SIGNAGE

12. LIGHT FIXTURE, SEE

ELECTRICAL DRAWINGS
#
3 BUILDING ELEVATION - INTERIOR COURTYARD

CALIFORNIA STREET

SAN ANTONIO ROAD

KEYPLAN
3 VARIES, SEE PERIMETER ELEVATIONS
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"

VARIES, SEE PERIMETER BUILDING ELEVATIONS
1'-0"
9'-1"
1'-0"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"

VARIES, SEE PERIMETER ELEVATIONS

EIGHTH FLOOR

SEVENTH FLOOR

SIXTH FLOOR

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

AVERAGE ROOF

SURFACE

EIGHTH FLOOR

SEVENTH FLOOR

SIXTH FLOOR

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

AVERAGE ROOF

SURFACE

VARIES, SEE PERIMETER BUILDING ELEVATIONS
1'-0"
9'-1"
1'-0"

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A3.5
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

BUILDING

COURTYARD

ELEVATIONS
ELEVATION KEYNOTE LEGEND:

1. PAINTED METAL

FLASHING CAP

2. METAL GUARD RAIL

3. PAINTED STUCCO WITH

CONTROL JOINTS, TYPICAL

4. DARK BRONZE ANODIZED
VINYL

FRAME WINDOW BY PLY GEM
(OR SIMILAR), TYPICAL

5. DARK BRONZE ANODIZED

STOREFRONT

BY KAWNEER (OR

SIMILAR) TYPICAL

6. PAINTED MECHANICAL LOUVER

7. PAINTED METAL

CANOPY AT

PROJECT ENTRY

8. PAINTED DOOR

9. METAL ROLL-UP
DOOR

10. METAL GRATE

11. PROJECT SIGNAGE

12. LIGHT FIXTURE, SEE

ELECTRICAL DRAWINGS
#
4 BUILDING ELEVATION - INTERIOR COURTYARD
1 33 45 12
4 CALIFORNIA STREET

SAN ANTONIO ROAD

KEYPLAN
4 12'-5" 1'-0"
9'-1"
1'-0"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
+/- 85'-0

FROM TOP OF CURB NORTHWEST CORNER OF SITE TO TOP OF AVERAGE ROOF SURFACE +/- 94'-8"
FROM TOP OF CURB AT NORTHWEST CORNER OF SITE TO TOP OF STAIR PENTHOUSE, NOT TO EXCEED 95'-0"

EIGHTH FLOOR

SEVENTH FLOOR

SIXTH FLOOR

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

AVERAGE ROOF

SURFACE
+/- 1/2"

TOP OF CURB TO TOP OF FINISH FLOOR

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A3.6
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

BUILDING

COURTYARD

ELEVATIONS

KEYPLAN
ELEVATION KEYNOTE LEGEND:

1. PAINTED METAL

FLASHING CAP

2. METAL GUARD RAIL

3. PAINTED STUCCO WITH

CONTROL JOINTS, TYPICAL

4. DARK BRONZE ANODIZED
VINYL

FRAME WINDOW BY PLY GEM
(OR SIMILAR), TYPICAL

5. DARK BRONZE ANODIZED

STOREFRONT

BY KAWNEER (OR

SIMILAR) TYPICAL

6. PAINTED MECHANICAL LOUVER

7. PAINTED METAL

CANOPY AT

PROJECT ENTRY

8. PAINTED DOOR

9. METAL ROLL-UP
DOOR

10. METAL GRATE

11. PROJECT SIGNAGE

12. LIGHT FIXTURE, SEE

ELECTRICAL DRAWINGS
#
5 BUILDING ELEVATION - INTERIOR COURTYARD
1 3 2 3 3 3410 812 36

CALIFORNIA STREET

SAN ANTONIO ROAD

KEYPLAN
5 85'-0

FROM TOP OF CURB NORTHWEST CORNER OF SITE TO TOP OF AVERAGE ROOF SURFACE 1'-0"
9'-1"
1'-0"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
+/- 94'-8"
FROM TOP OF CURB AT SOUTHWEST CORNER OF SITE TO TOP OF STAIR PENTHOUSE, NOT TO EXCEED 95'-0" +/- 10 1/2"

TOP OF FINISH GRADE TO TOP OF FINISH FLOOR
11'-2"
1'-0"
9'-1"
1'-0"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
+/- 84'-7"

FROM TOP OF FINISH GRADE AT SOUTHWEST CORNER OF SITE TO TOP OF AVERAGE ROOF SURFACE 1/2"

TOP OF CURB TO TOP OF FINISH FLOOR

EIGHTH FLOOR

SEVENTH FLOOR

SIXTH FLOOR

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

AVERAGE ROOF

SURFACE

EIGHTH FLOOR

SEVENTH FLOOR

SIXTH FLOOR

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

AVERAGE ROOF

SURFACE
12'-5"

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A3.7
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

BUILDING

ELEVATIONS
N
ELEVATION KEYNOTE LEGEND:

1. PAINTED METAL

FLASHING CAP

2. METAL GUARD RAIL

3. PAINTED STUCCO WITH

CONTROL JOINTS, TYPICAL

4. DARK BRONZE ANODIZED
VINYL

FRAME WINDOW BY PLY GEM
(OR SIMILAR), TYPICAL

5. DARK BRONZE ANODIZED

STOREFRONT

BY KAWNEER (OR

SIMILAR) TYPICAL

6. PAINTED MECHANICAL LOUVER

7. PAINTED METAL

CANOPY AT

PROJECT ENTRY

8. PAINTED DOOR

9. METAL ROLL-UP
DOOR

10. METAL GRATE

11. PROJECT SIGNAGE

12. LIGHT FIXTURE, SEE

ELECTRICAL DRAWINGS
#
6 BUILDING ELEVATION
1 3 3 4 6 103 3 312 2

CALIFORNIA STREET

SAN ANTONIO ROAD

KEYPLAN
6 7

BUILDING ELEVATION
11'-2"
1'-0"
9'-1"
1'-0"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
+/- 84'-7"
FROM FINISH GRADE AT SOUTHWEST CORNER OF SITE TO TOP OF AVERAGE ROOF SURFACE, NOT TO EXCEED 85'-0" 11'-2"
1'-0"
9'-1"
1'-0"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
+/- 1"

TOP OF CURB TO TOP OF FINISH FLOOR
+/- 83'-9 1/2"
FROM FINISH GRADE AT SOUTHEAST CORNER OF SITE TO TOP OF AVERAGE ROOF SURFACE, NOT TO EXCEED 85'-0"

EIGHTH FLOOR

SEVENTH FLOOR

SIXTH FLOOR

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

AVERAGE ROOF

SURFACE

EIGHTH FLOOR

SEVENTH FLOOR

SIXTH FLOOR

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

AVERAGE ROOF

SURFACE
+/- 10 1/2"

TOP OF FINISH GRADE TO TOP OF FINISH FLOOR

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A3.8
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

BUILDING

ELEVATIONS
N
ELEVATION KEYNOTE LEGEND:

1. PAINTED METAL

FLASHING CAP

2. METAL GUARD RAIL

3. PAINTED STUCCO WITH

CONTROL JOINTS, TYPICAL

4. DARK BRONZE ANODIZED
VINYL

FRAME WINDOW BY PLYGEM
(OR SIMILAR), TYPICAL

5. DARK BRONZE ANODIZED

STOREFRONT

BY KAWNEER (OR

SIMILAR) TYPICAL

6. PAINTED MECHANICAL LOUVER

7. PAINTED METAL

CANOPY AT

PROJECT ENTRY

8. PAINTED DOOR

9. METAL ROLL-UP
DOOR

10. METAL GRATE

11. PROJECT SIGNAGE

12. LIGHT FIXTURE, SEE

ELECTRICAL DRAWINGS
#
1 3 3 23 3 3 3 4 78 126

CALIFORNIA STREET

SAN ANTONIO ROAD

KEYPLAN
7 HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
A3.9

COLORS &

MATERIALS
BODY COLOR 1

EXTERIOR WALL MATERIAL

CEMENT PLASTER - MEDIUM SAND FINISH
Oyster White SW 7637 by Sherwin Williams
1 BODY COLOR 3

EXTERIOR WALL MATERIAL

CEMENT PLASTER - FINE SAND FINISH
Porpoise SW 7047 by Sherwin Williams
3 BODY COLOR 4

EXTERIOR WALL MATERIAL

CEMENT PLASTER - MEDIUM SAND FINISH
Sierra Redwood SW 7598 by Sherwin Williams
4 ACCENT COLOR 5

EXTERIOR WALL MATERIAL

CEMENT PLASTER - MEDIUM SAND FINISH
Extra White SW 7006 by Sherwin Williams
5 ACCENT COLOR 6

EXTERIOR WALL MATERIAL

CEMENT PLASTER - MEDIUM SAND FINISH
Caviar SW 6990 by Sherwin Williams
6 BODY COLOR 2

EXTERIOR WALL MATERIAL

CEMENT PLASTER - MEDIUM SAND FINISH
Intellectual Gray SW 7045 by Sherwin Williams
2 36 24 15
NOT TO SCALE (N.T.S.)
NOTE: ELEMENTS OF STREETSCAPE ELEVATIONS ARE REPRODUCED

FROM PREVIOUS ENTITLEMENT OF OUR PROJECT SITE

BUILDING OUTLINE HAS BEEN

REFERENCED FROM PREVIOUS

ENTITLEMENT OF OUR PROJECT SITE

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A4.1
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT

STREETSCAPE

ELEVATIONS
NOT TO SCALE (N.T.S.)
2 STREETSCAPE ELEVATION - CALIFORNIA STREET
2 STREETSCAPE ELEVATION - SAN ANTONIO ROAD

CORRID. 2BD UNIT3BD UNIT
CORRID. 2BD UNIT3BD UNIT
CORRID. 2BD UNIT3BD UNIT
CORRID. 2BD UNIT3BD UNIT
CORRID. 2BD UNIT3BD UNIT
CORRID. 2BD UNIT3BD UNIT
CORRID. 2BD UNIT3BD UNIT
CORRID.SECURE
BIKE
ROOM
1BD UNIT 3BD UNITCORRID.
1BD UNIT 3BD UNITCORRID.
1BD UNIT 3BD UNITCORRID.
1BD UNIT 3BD UNITCORRID.
1BD UNIT 3BD UNITCORRID.
1BD UNIT 3BD UNITCORRID.
1BD UNIT 3BD UNITCORRID.

DUMPSTER
ROOM
CORRID.

CORRID.

CORRID.

CORRID.

CORRID.

CORRID.

GARAGE
+/-12'-5"

HEIGHT AT NORTHWEST END OF GARAGE
+/- 12'-1 1/2"
HEIGHT AT BIKE RM. AND COMMUNITY RM.
1'-0"
9'-1"
1'-0"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"

EIGHTH FLOOR

SEVENTH FLOOR

SIXTH FLOOR

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

AVERAGE ROOF

SURFACE
85'-0"
FROM TOP OF CURB AT NORTHWEST CORNER OF SITE TO TOP OF AVERAGE ROOF SURFACE, NOT TO EXCEED 85'-0" 1'-0"
9'-1"
1'-0"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"
1'-2"
9'-1"

EIGHTH FLOOR

SEVENTH FLOOR

SIXTH FLOOR

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

AVERAGE ROOF

SURFACE
+/- 84'-8 1/2"
FROM TOP OF CURB AT NORTHEAST CORNER OF SITE TO TOP OF AVERAGE ROOF SURFACE, NOT TO EXCEED 85'-0"

COMMUNITY
ROOM

CALIFORNIA STREET

SAN ANTONIO ROAD

KEYPLAN
AA

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A4.2
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

BUILDING

SECTION
A

SECTION A-A

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A5.6
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
©2024
Dero Decker Setbacks Single Sided
48” Min. 45”29.5”34”34”28.5”
17” 8.5” 64”
8”24”
20”
106”
78”60”
Recommended
©2024

FINISH OPTIONS
Galvanized Powder Coat
Black Light Gray
RAL 7042
Deep Red
RAL 3003
Y ellow
RAL 1023
White
Hunter Green
RAL 6005
CNH Bright
Y ellow
Orange
RAL 2004
Light Green
RAL 6018
Green
RAL 6016
Sepia Brown
RAL 8014 RAL 5005
Bronze Silver
RAL 9007Dark Purple Flat Black Wine Red
RAL 3005
Beige
RAL 1001
Iron Gray
RAL 7011
Blue Sky Blue
RAL 5015
Dero Decker
• Sturdy red handle grips
• Lift-assist trays
• Dampers for safe lowering of trays
• Spring loaded levers hold bikes
firmly in place
• U-lock compatible
• Smallest footprint
• Smooth and silent operation
• Simple installation
• Low maintenance
• Specially designed fat bike trays
available
• ADA cane-detectable extensions
available for lower trays
©2022
Ultra Space Saver™ Squared Setbacks
min.
ceiling
87"
30"
42"
116"
36"
36"
76"
56"57 .5" 47 .5"

PROPOSED STACKING LONG-TERM BIKE RACK
(OR SIMILAR)

PROPOSED WALL-MOUNTED LONG-TERM BIKE RACK
(OR SIMILAR)

PROPOSED

BIKE RACKS
©2022

FINISH OPTIONSMOUNT OPTIONS
GalvanizedPowder CoatFloor
Wall
Black
Light Gray
RAL 7042
Deep Red
RAL 3003
Y ellow
RAL 1023
White
Hunter Green
RAL 6005
CNH Bright
Y ellow
Orange
RAL 2004
Light Green
RAL 6018
Green
RAL 6016
Sepia Brown
RAL 8014
RAL 5005
Bronze Silver
RAL 9007
Dark Purple Flat BlackWine Red
RAL 3005
Beige
RAL 1001
Iron Gray
RAL 7011
Blue Sky Blue
RAL 5015
Ultra Space Saver™ Squared
• Modular design fits nearly
any space
• U-lock compatible
• Easy assembly
• Double your capacity
• Square tubing for greater
security
• Spacing between arms
can be varied
• Tire stops available
• ADA cane stops available

PLANNING DATA BASE DENSITY CALCULATION COMMON USABLE OPEN SPACE Address 334 San Antonio Road, Mountain View, California 94040 Total Required 175 SF / unit 100 UNITS = 17,500 SF APN 148-15-020 Total Provided8

35.56 SF / unit 100 UNITS = 3,556 SF
Total Site Area 27,090 SF (8) Refer to Density Bonus Letter provided for more information regarding common usable open space. See Sheet A6.6 for diagram.

0.62 AC BMR UNITS PROVIDED
Existing Zoning P(40) - Planned Community / San Antonio Precise Plan PRIVATE OPEN SPACE Existing GP Land Use Information Mixed Use Corridor (January 2020) Total Required9 0 SF / unit 100 UNITS = 0 SF
Project Units Proposed 100 Total Provided 0 SF / unit 100 UNITS = 0 SF Proposed DU/AC 161 CONCESSIONS/INCENTIVES (9) None required per San Antonio Precise Plan.

FEMA Special Hazard Zone FEMA Special Hazard Zone Maps not applicable

PAVING COVERAGE, OPEN AREA, & PERCENTAGE OF LANDSCAPING

WAIVERS

GREEN BUILDING NOTES
OCCUPANCY GROUPS Project shall meet mandatory CalGreen requirements and any Mountain View Amendments Residential R-2 RESIDENTIAL STORAGE Project shall demonstrate energy compliance to meet or exceed Title 24, Part 6 Garage S-2 Total Required 164 CF / unit 100 UNITS = 16,400 CF Total Provided7
0 CF / unit 0 CF
CONSTRUCTION TYPE (7) Refer to Density Bonus Letter provided for more information regarding residential storage requirements. All installed water fixtures will be low-flow per CalGreen requirements 3 STORIES TYPE IA, NFPA 13 SPRINKLERS Annular spaces shall be rodent proofed 2022 CBC Table 601 Fire-resistance rating FLOOR AREA CALCULATIONS Gross Building Project shall meet the minimum 65% construction waste diversion requirements per Cal Green Primary Structural Frame 3 HOURS ALLOWABLE FAR Tier 1 1.85 FAR Project shall be all electrical, no natural gas installed Bearing Walls - Exterior 2 HOURS <--------- ACTUAL TOTAL BUILDING AREA BLDG Balconies SF All open duct/registers shall be covered/protected during construction Bearing Walls - Interior 2 HOURS <--------- Level 1 Residential 8,798 0 Non-Bearing Walls - Exterior 1 HOUR <--------- Garage 6,837 0 Non-Bearing Walls - Interior 0 HOUR Level 2 Residential 14,983 0 Concrete foundations shall have a vapor retarder/capillary break installed Floor Construction 2 HOURS Level 3 Residential 14,983 0 Moisture content for wood framing shall not exceed 19% per CalGreen Roof Construction 1.5 HOURS Level 4 Residential 14,739 0 Bathroom exhaust fans shall be Energy Star rated Level 5 Residential 14,512 0 HVAC installers shall be qualified and trained to perform the required installations Horizonal Separation 3 HOURS PER 2022 CBC 510.2 Level 6 Residential 14,512 0 Construction Waste Management Plan/Diversion will be provided for demolitions 5 STORIES TYPE IIIA, NFPA 13 SPRINKLERS Level 7 Residential 14,512 0 Operation and maintenance manual will be provided at the time of final inspection 2022 CBC Table 601 Fire-resistance rating Level 8 Residential 14,410 0 Primary Structural Frame 1 HOUR PROPOSED FAR (includes Density Bonus) 118,286 0 4.37 FAR TYPICAL CONCEPTUAL RESIDENTIAL UNITS Bearing Walls - Exterior 2 HOURS Unit Type Quantity
Avg Unit SF (Gross
Square Footage) Percentage
Approximate
Total SF
Bearing Walls - Interior 1 HOUR ZONING BUILDING AREA 1 bedroom 36 499 36% 17,964 Non-Bearing Walls - Exterior 1 HOUR <--------- Residential 111,449 2 bedroom 28 763 28% 21,364 Non-Bearing Walls - Interior 0 HOUR Non-Residential (Garage) 6,837 3 bedroom 36 1,018 36% 36,648 Floor Construction 1 HOUR Total 118,286 TOTAL ALL UNITS 100 760 100% 75,976 Roof Construction 1 HOUR

GROSS BUILDING AREAS BY SPACE TYPE (SF) VEHICULAR PARKING SPACES REQUIRED ZONING BUILDING PARAMETERS (SAN ANTONIO PRECISE PLAN, TIER 1) Units 75,976 ALLOWED1, 2 PROPOSED Amenity 2,766
HEIGHT 55'-0" 85'-0" Office 356
STORIES 4 8 Circulation 26,096 1 bedroom 36 1 36 0 Utility 6,254 2 bedroom 28 2 56 0 Garage 6,837 3 bedroom 36 2 72 0
SETBACKS REQUIRED PROPOSED3
Total 118,286 Total Car Parking Spaces Required 0 Major Public Street (San Antonio Road) 18'-0" 19'-6" GROSS BUILDING AREAS BY SPACE TYPE PER FLOOR (SF) Neighborhood Street (California Street)4
24'-0" 15'-9" Level 1
Side Yard (southwest) NONE REQUIRED 6'-0" Units 1,289 Rear Yard (northwest) NONE REQUIRED 10'-4" Amenity 2,389 VEHICULAR PARKING SPACES PROVIDED11 (3) Setbacks are measured from curb line, per the San Antonio Precise Plan Figure 4-4, to the closest point of the building, see Architectural Site Plan Sheet A1.6 Office 356 Standard Spaces 15 (4) Provided setback is less, based on Waiver Circulation 2,143 Van Accessible Space 12 per 2022 CBC Table 11B-208.2 1
ALLOWED PROPOSED5
Utility 2,620 Total Vehicular Parking Spaces Provided 16 FAR 1.85 4.37 Garage 6,837
Total 15,635
Level 2
CODE BUILDING PARAMETERS (2022 CBC) Occupancy R2 / S2 without area increase / Type IA & IIIA Units 10,821 ELECTRIC VEHICLE CHARGING STATION (EVCS) & ELECTRIC VEHICLE SUPLY EQUIPMENT (EVSE) REQUIRED ALLOWED PROPOSED Circulation 3,408 Spaces served by installed Level 2 EVSE (EV2) per MVCC Table 101.10 (15%*16 = 2.40) 3 HEIGHT6 85'-0" 85'-0" Utility 754 Spaces served by installed Level 3 EVSE (EV3) per MVCC Table 101.10 (1 per 100 spaces) 1 STORIES Total 14,983 EV Ready Spaces per MVCC Table 101.10 (all non EV installed spaces) 12 Type IA UL 3 Level 3 Total Spaces13
16 Type IIIA 5 5 Units 10,821
Total 8 Amenity 377
Circulation 3,408
Utility 377 ELECTRIC VEHICLE CHARGING STATION (EVCS) & ELECTRIC VEHICLE SUPLY EQUIPMENT (EVSE) PROVIDED Total 14,983 Installed Level 2 EVSE (EV2) 2 installed chargers, 4 spaces served Occupancy S-2 / SM with height increase / Type IA UL 0 7,153 Level 4 Installed Level 3 EVSE (EV3) 1 installed charger, 2 spaces served Occupancy R-2 / SM with height increase / Type IA UL 22,096 16,352 Units 10,609 EV Ready Spaces 12 remaining spaces not served by a charger Occupancy R-2 / SM with height increase / Type IIIA 48,000 33,347 39,338 Circulation 3,383 Total Spaces14 16 Utility 747
BUILDING ALLOWABLE AREAS Total 14,739
TOTAL OCCUPANCY ACTUAL (SF) ALLOWABLE (SF) Level 5
Level 1 Mixed Occupancy 8,482 UL Units 10,609 PAVEMENT COVERAGE (per SAPP Section 4.D p. 82) S-2 (Garage) 7,153 UL Circulation 3,469 Garage Area 6,837 Level 2 R-2 (Residential) 14,983 UL Utility 434 Driveway 511 Level 3 R-2 (Residential) 14,983 UL Total 14,512 TOTAL PAVEMENT COVERAGE (SF) 7,348 Level 4 R-2 (Residential) 14,739 24,000 0.61 Level 6 TOTAL PAVEMENT COVERAGE (PERCENTAGE OF SITE AREA) 27% Level 5 R-2 (Residential) 14,512 24,000 0.60 Units 10,609 Level 6 R-2 (Residential) 14,512 24,000 0.60 Circulation 3,469 MOTORCYCLE PARKING SPACES PROVIDED Level 7 R-2 (Residential) 14,512 24,000 0.60 Utility 434 Motorcycle Spaces 2 Level 8 R-2 (Residential) 14,410 24,000 0.60 Total 14,512

3.03 >2 Level 7 BIKE PARKING
FIRE WALL AREA #A ACTUAL (SF) ALLOWABLE (SF) Units 10,609 CLASS I15 CLASS II 16 Level 1 Mixed Occupancy 8,482 UL Circulation 3,469 Resident 1 per unit 100 Level 2 R-2 (Residential) 6,807 UL Utility 434 Residential Guest 1 per 10 units 10 Level 3 R-2 (Residential) 6,807 UL Total 14,512 Total Required 100 10 110 Level 4 R-2 (Residential) 6,659 24,000 0.28 Level 8 Level 1 Bicycle Room Parking (Long-Term)15 100 Level 5 R-2 (Residential) 6,659 24,000 0.28 Units 10,609 Level 1 Bicycle Rack Parking (Short-Term) 16 14 Level 6 R-2 (Residential) 6,659 24,000 0.28 Circulation 3,347 Total Provided 100 14 114 Level 7 R-2 (Residential) 6,659 24,000 0.28 Utility 454 (15) Class I Facility - locked storage room and/or lockers inside building for residents and retail owner / not general public Level 8 R-2 (Residential) 6,711 24,000 0.28 Total 14,410

1.39 < 2 2022 CBC 506.2.2
FIRE WALL AREA #B ACTUAL (SF) ALLOWABLE (SF)
Level 1 S-2 (Garage) 7,153 UL
Level 2 R-2 (Residential) 8,176 UL
Level 3 R-2 (Residential) 8,176 UL
Level 4 R-2 (Residential) 8,080 24,000 0.34
Level 5 R-2 (Residential) 7,853 24,000 0.33
Level 6 R-2 (Residential) 7,853 24,000 0.33
Level 7 R-2 (Residential) 7,853 24,000 0.33
Level 8 R-2 (Residential) 7,699 24,000 0.32

1.64 < 2 2022 CBC 506.2.2
3-hour Fire Wall required 2022 CBC Table 706.4
1-hour Occupancy Separation required between S-2:R-2; A-3:R-2 - (Sprinklered) 2022 CBC Table 508.4 0 HOUR if more than 30 feet fire separation distance per 2022 CBC table 705.5
0 HOUR if more than 30 feet fire separation distance per 2022 CBC table 705.5
2 HOURS per 2022 CBC 403.2.1.1 EX. 1
Refer to Base Density Study provided.

Refer to Density Bonus Letter provided.

Refer to Density Bonus Letter provided.

Refer to Density Bonus Letter provided.

Construction shall comply with the 2022 California Building Code including CBC Chapter 11B insofar as it is applicable to this project.

See Sheet A6.6 for calculations and diagram.

Project will install photovoltaic panels as required for Multi-family housing. The system will be designed by a PV Engineer and additional details on the system will be provided as the building progresses toward building permits.

All installed materials such as flooring, insulation, counter top, carpets, and finishing materials such as paints, primers, adhesives shall meet CalGreen's VOC requirements

BUILDING CODE
(16) Class II Facility - exterior racks to which bicycles can be locked / general public. Each rack has capacity for 2 bikes. Number represents number of bikes accommodated by bike racks, not number of racks.

Unit Type Quanitty SAPP Ratio SAPP Required
Density Bonus
Required10
(11) All spaces will be assigned.
(12) No additional guest parking required, see Density Bonus Letter Provided. (10) Per Density Bonus Law (State of California Government Code Section 65915) no parking is required for 100% low -income rental developments located within 1/2 mile of a major transit stop.
(14) Refer to plan sheet A2.1 for additional information on location of chargers and spaces served. Per CGBC 4.106.4.2.2.1.1, the 1 required space sized to accommodate an accessible vehicle has been provided and has access to service by both a level 2 and a level 3 charger. (13) 1 per 25 spaces shall be sized to accommodate an accessible vehicle with a 9' wide x 18' long parking space adjacent to an 5' wide aisle per CGBC 4.106.4.2.2.1.1. (5) Density Bonus Law is used to permit a higher FAR than allowed by the San Antonio Precise Plan (1) Per the San Antonio Precise Plan, Tier 1 projects of 5 stories (65 feet) will be considered if project provides significant public benefits. (2) Per the San Antonio Precise Plan, Tier 1 projects of 5 stories (65 feet) will be considered if project provides significant public benefits.

ALLOWABLE AREAS (SF) ALLOWED

PROPOSED FIREWALL
AREA A

PROPOSED FIREWALL
AREA B
(6) Building height is defined as the vertical distance from grade plane to the average height of the highest roof surface; excludes stair tower penthouse.

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A6.1
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT

PROJECT DATA

SUMMARY
5 5
5 5
5 5

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A6.3
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
California St
Miller Ave
California St
San Antonio Rd

NEIGHBORHOOD

CONTEXT
NOT TO SCALE (N.T.S.)
N
1 2
3 4
5 6
7 8
VIEW TOWARD NORTHEAST ACROSS CALIFORNIA STREET7

VIEW OF COMMERCIAL AND MIXED-USE BUILDINGS ACROSS SAN ANTONIO ROAD FROM PROJECT SITE

VIEW TOWARD NORTHWEST FROM INTERSECTION OF SAN ANTONIO ROAD AND CALIFORNIA STREET

VIEW OF PROJECT SITE FROM CALIFORNIA STREET
5 3
1 4 VIEW FROM PROJECT SITE ACROSS INTERSECTION OF SAN ANTONIO ROAD AND CALIFORNIA STREET

VIEW OF PROJECT SITE FROM INTERSECTION OF SAN ANTONIO ROAD AND CALIFORNIA STREET 6 2

ADJACENT PROPERTIES TO SOUTH OF PROJECT ON SAN ANTONIO ROAD 8 ADJACENT PROPERTY WEST OF PROJECT SITE ON CALIFORNIA STREET

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A6.4
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT

SHADOW STUDIES
9:00 AM, SUMMER SOLSTICE (JUNE 21) 12:00 PM, SUMMER SOLSTICE (JUNE 21) 3:00 PM, SUMMER SOLSTICE (JUNE 21) 9:00 AM, WINTER SOLSTICE 12:00 PM, WINTER SOLSTICE (DECEMBER 21) 3:00 PM, WINTER SOLSTICE (DECEMBER 21) 9:00 AM, FALL & SPRING EQUINOX (MARCH & SEPTEMBER 21) 12:00 PM, FALL & SPRING EQUINOX (MARCH & SEPTEMBER 21) 3:00 PM, FALL & SPRING EQUINOX (MARCH & SEPTEMBER 21) NOT TO SCALE (N.T.S.)
N
4 3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE
3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE
2CY NARROW

LOOSE FRONT

LOAD BIN

CONTAINER

RECYCLING
3CY NARROW

LOOSE FRONT

LOAD BIN
PAPER

RECYCLING
2CY NARROW

LOOSE FRONT

LOAD BIN

CONTAINER

RECYCLING
MC
P W
64G CART

COMPOST
64G CART

COMPOST
3CY NARROW

LOOSE FRONT

LOAD BIN
PAPER

RECYCLING
8FT ROLL UP DOOR WITH

KEYPAD ACCESS
64G CART

COMPOST
64G CART

COMPOST
PAPER

RECYCLING
WASTE

CONTAINER

RECYCLING
3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE
ENTRY
LOBBY
OFFICE
119 SF
OFFICE
189 SF
BOILER
MPOE
DOM. PUMP

JANITOR
TRASH
1BD UNIT
ELEC.

E.EQ.

FIRE
PUMP
ERRCS
ENTRY

MAINTENANCE

WORKSPACE/

COMPUTER LAB

MAIL/PARCEL
IDF
RR
RR
GARAGE
16 ASSIGNED RESIDENTIAL

CAR PARKING SPACES

ALL STALLS NOT MARKED AS
"EVCS EQUIPPED" TO BE

EV CAPABLE
UP

COMMUNITY
SPACE
750 SQ FT

RESERVED FOR

RIDESHARE

PICK-UP/DROP-OFF
BIKE
ROOM
892 SF
100 BIKES
DN
DN
UP

VAN ACCESSIBLE SPACE
LEVEL 2 EVSE (EV2)
LEVEL 3 EVSE (EV3)
LEVEL 2 EVSE (EV2)

GARAGE GATE, SEE
SHEET A5.2 FOR DETAILS

TRANSFORMER

PEDESTRIAN

TRIANGLE

OF SAFETY

TRAFFIC SAFETY

VISIBILITY AREA

SEE TR SERIES SHEETS

FOR MORE DETAILED

INFORMATION
3BD UNIT
TRASH
ROOM

SHORT-TERM EXTERIOR BIKE
RACKS - 14 BIKES
GARDEN
LOBBY

EVCS SERVED BY
INSTALLED LEVEL 2
EVSE (EV2)

EVCS SERVED BY
INSTALLED LEVEL 2
EVSE (EV2)

EVCS SERVED BY INSTALLED
LEVEL 2 EVSE (EV2) AND
INSTALLED LEVEL 3 EVSE (EV3)
(ACCOMMODATES VAN

ACCESSIBILITY)

EVCS SERVED BY INSTALLED
LEVEL 2 EVSE (EV2) AND
INSTALLED LEVEL 3 EVSE (EV3)
2 MOTORCYCLE
SPACES
GUARD RAIL - 3'-0" MAX.

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A6.5
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

CIRCULATION

DIAGRAM

PEDESTRIAN CIRCULATION

BICYCLE CIRCULATION

VEHICLE CIRCULATION
NOTES:

1. FOR FIRE TRUCK
CIRCULATION, S.C.D.

2. FOR TRASH VEHICLE

CIRCULATION, SEE
TR SERIES PLANS.

KEY:

CALIFORNIA ST

SAN ANTONIO RD
3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE
3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE
2CY NARROW

LOOSE FRONT

LOAD BIN

CONTAINER

RECYCLING
3CY NARROW

LOOSE FRONT

LOAD BIN
PAPER

RECYCLING
2CY NARROW

LOOSE FRONT

LOAD BIN

CONTAINER

RECYCLING
MC
P W
64G CART

COMPOST
64G CART

COMPOST
3CY NARROW

LOOSE FRONT

LOAD BIN
PAPER

RECYCLING
8FT ROLL UP DOOR WITH

KEYPAD ACCESS
64G CART

COMPOST
64G CART

COMPOST
PAPER

RECYCLING
WASTE

CONTAINER

RECYCLING
3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A6.6
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N
ZONING

CALCULATIONS &

DIAGRAM
3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE
3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE
2CY NARROW

LOOSE FRONT

LOAD BIN

CONTAINER

RECYCLING
3CY NARROW

LOOSE FRONT

LOAD BIN
PAPER

RECYCLING
2CY NARROW

LOOSE FRONT

LOAD BIN

CONTAINER

RECYCLING
MC
P W
64G CART

COMPOST
64G CART

COMPOST
3CY NARROW

LOOSE FRONT

LOAD BIN
PAPER

RECYCLING
8FT ROLL UP DOOR WITH

KEYPAD ACCESS
64G CART

COMPOST
64G CART

COMPOST
PAPER

RECYCLING
WASTE

CONTAINER

RECYCLING
3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE

RESIDENTIAL COMMON USABLE
OPEN SPACE5
3,556 SF (13.13%)
TOTAL SITE AREA5 27,090 SF (100%)
10,203 SF (37.66%)OPEN AREA/PERCENTAGE OF LANDSCAPING4+ 2CY
LOO
L
CO
RE
64G
COM
64G
COM
64G
COM
64G
COM
9,539 SF (35.21%)BUILDING COVERAGE1
NOTES:

1. BUILDING COVERAGE IS DEFINED AS THE TOT

AL LOT AREA COVERED BY
STRUCTURES.

2. STRUCTURE IS DEFINED AS THAT WHICH

IS BUILT OR CONSTRUCTED,

AN EDIFICE OR BUILDING OF ANY KIND OR ANY PIECE OF WORK

ARTIFICIALLY BUILT UP OR COMPOSED OF PARTS JOINED TOGETHER IN SOME DEFINITE MANNER.

3. PAVING IS DEFINED AS ANY

AREA NECESSARY FOR THE INGRESS, EGRESS,
OR PARKING OF MOTOR VEHICLES. THIS PROJECT HAS COUNTED THE GARAGE AREA IN PAVEMENT COVERAGE.

4. OPEN AREA IS DEFINED AS THE TOT

AL LOT AREA MINUS THE AREA

COVERED BY BUILDINGS, ACCESSORY STRUCTURES, OTHER

STRUCTURES, GARBAGE AND REFUSE FACILITIES, DRIVEWAYS, AND OFF- STREET PARKING. THIS PROJECT DOES NOT PROPOSE ANY STAND-ALONE GARBAGE AND REFUSE FACILITIES OR OFF-STREET PARKING.

5. TOTAL SITE AREA

IS DEFINED AS THE COMPUTED AREA CONTAINED WITHIN

THE LOT LINES, EXCLUSIVE OF STREET RIGHTS-OF-WAY, BUT INCLUDING EASEMENTS.

6. PER THE SAN ANTONIO PRECISE PLAN CHAPTER 4, SECTION D, SETBACKS

ARE NOT CONSIDERED RESIDENTIAL COMMON USABLE OPEN SP
ACE
UNLESS THEY ARE 25’-0” WIDE.

DEFINITIONS SOURCED FROM CITY OF MOUNTAIN VIEW’S ZONING CALCULATIONS: METHODS, DEFINITIONS AND CLARIFICATIONS UNLESS OTHERWISE NOTED.

PAVEMENT COVERAGE3 7,348 SF (27.13%)
5 5
ROOF
BELOW
IDF
JAN
1BD UNIT
2BD UNIT
2BD UNIT
1BD UNIT
1BD UNIT
ROOF
BELOW
2BD UNIT
3BD UNIT
2BD UNIT
1BD UNIT
3BD UNIT
3BD UNIT
1BD UNIT
3BD UNIT
3BD UNIT
DN
DN
DN
UP
TRASH
CHUTES

SEE TR SERIES SHEETS FOR MORE

DETAILED INFORMATION
2BD UNIT
34 SAN ANTONIO ROAD, MOUNTAINVIEW

ROJECT CLIENT

CRP AFFORDABLE
JOB NO.
1648.002
05-02-2023
DATE
5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
0 32
16 8
SCALE 1/8" = 1'-0"
0 16
8 4
4 FAR DIAGRAM
NOT TO SCALE (N.T.S.)

HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A6.7
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
NOTE: FIFTH THROUGH SEVENTH FLOOR PLAN AND FIFTH THROUGH SEVENTH GROSS FLOOR

AREAS ARE SHOWN AS A TYPICAL CONDITION TO ILLUSTRATE HOW FAR HAS BEEN CALCU- LATED. ALL BUILDING AREAS HAVE BEEN COUNTED ON EACH FLOOR PLAN LEVEL. FOR A DE- TAILED PER-FLOOR BREAKDOWN OF GROSS FLOOR AREAS, SEE THE TABLE TITLED "GROSS BUILDING AREAS BY SPACE TYPE (SF)" ON SHEET A6.1.

EIGHTH FLOOR AREA = 14,410 SF
SEVENTH FLOOR AREA = 14,512 SF
SIXTH FLOOR AREA = 14,512 SF
FIFTH FLOOR AREA = 14,512 SF
FOURTH FLOOR AREA = 14,739 SF
THIRD FLOOR AREA = 14,983 SF
SECOND FLOOR AREA = 14,983 SF
NOTES:

1. FLOOR AREAS SHALL INCLUDE THE FOLLOWING: ALL FLOOR
AREA

ENCLOSED WITHIN THE WALLS OF THE PRINCIPAL

STRUCTURE (MEASURED FROM THE OUTSIDE PERIMETER
OF THE WALLS); THE TOTAL FLOOR AREA OF ALL ACCESSORY

STRUCTURES, INCLUDING GARAGES, CARPORTS, AND STORAGE
SHEDS; ENCLOSED PATIOS, AND ANY OTHER FULLY ENCLOSED

SPACE THAT CONTRIBUTES TOWARD THE OVERALL MASS OR
BULK OF THE BUILDING.

2. THE TOTAL

AREA OF EACH FLOOR IS DEFINED AS THE AREA
ENCLOSED BY THE EXTERIOR PERMANENT WALLS. THIS HAS
BEEN CALCULATED SEPARATELY. OPENINGS FOR STAIRWAYS OR
SHAFTS HAVE NOT BEEN DEDUCTED.

3. “OPEN, UNENCLOSED STRUCTURES” SUCH AS DECKS, OPEN

PORCHES, OPEN PATIOS, AND TRELLISES

ARE NOT COUNTED
AS FLOOR AREA. A COVERED STRUCTURE IS “OPEN AND
UNENCLOSED” IF IT HAS WALLS ON NO MORE THAN TWO SIDES.

AN UNCOVERED STRUCTURE IS “OPEN AND UNENCLOSED” IF IT
HAS WALLS ON NO MORE THAN THREE SIDES.

DEFINITIONS SOURCED FROM CITY OF MOUNTAIN VIEW’S ZONING CALCULATIONS: METHODS, DEFINITIONS AND CLARIFICATIONS
GROUND FLOOR AREA = 15,635 SF
SITE AREA = 27,090 SF
118,286 SF / 27,090 SF = 4.37 FAR
TOTAL BUILDING AREA = 118,286 SF

TYPICAL
FLOOR
PLAN

GROSS BUILDING AREA BY SPACE TYPE (SF)
FIFTH THROUGH SEVENTH FLOORS, TYP.

TYPICAL FIFTH THROUGH SEVENTH FLOOR PLAN
Garage 6,837 3 bedroom
REQUIRED PROPOSED3
Total 118,286 Total Car Parking Spaces Required 18'-0" 19'-6" GROSS BUILDING AREAS BY SPACE TYPE PER FLOOR (SF) 24'-0" 15'-9" Level 1
NONE REQUIRED 6'-0" Units 1,289
NONE REQUIRED 10'-4" Amenity 2,389 VEHICULAR PARKING SPACES PROVIDED11 ee Architectural Site Plan Sheet A1.6 Office 356 Standard Spaces Circulation 2,143 Van Accessible Space 12
ALLOWED PROPOSED5
Utility 2,620 Total Vehicular Parking Spaces Provided

1.85 4.37 Garage 6,837
Total 15,635
Level 2
Units 10,821 ELECTRIC VEHICLE CHARGING STATION (EVCS) & ALLOWED PROPOSED Circulation 3,408 Spaces served by installed Level 2 EVSE (EV2) 85'-0" 85'-0" Utility 754 Spaces served by installed Level 3 EVSE (EV3) Total 14,983 EV Ready Spaces
UL 3 Level 3 Total Spaces13
5 5 Units 10,821
8 Amenity 377
Circulation 3,408
Utility 377 ELECTRIC VEHICLE CHARGING STATION (EVCS) & Total 14,983 Installed Level 2 EVSE (EV2)
UL 0 7,153 Level 4 Installed Level 3 EVSE (EV3)
UL 22,096 16,352 Units 10,609 EV Ready Spaces 48,000 33,347 39,338 Circulation 3,383 Total Spaces14 Utility 747
Total 14,739
F) Level 5
UL Units 10,609 PAVEMENT COVERAGE (per SAPP Section 4.D p. 82 UL Circulation 3,469 Garage Area
UL Utility 434 Driveway
UL Total 14,512 TOTAL PAVEMENT COVERAGE (SF) 00 0.61 Level 6 TOTAL PAVEMENT COVERAGE (PERCENTAGE O
00 0.60 Units 10,609
00 0.60 Circulation 3,469 MOTORCYCLE PARKING SPACES PROVIDED 00 0.60 Utility 434 Motorcycle Spaces 00 0.60 Total 14,512

3.03 >2 Level 7 BIKE PARKING
F) Units 10,609
UL Circulation 3,469 Resident 1 per unit UL Utility 434 Residential Guest 1 per 10 units UL Total 14,512 Total Required
00 0.28 Level 8 Level 1 Bicycle Room Parking (Long-Term)15 00 0.28 Units 10,609 Level 1 Bicycle Rack Parking (Short-Term) 16 00 0.28 Circulation 3,347 Total Provided 00 0.28 Utility 454 (15) Class I Facility - locked storage room and/or lock 00 0.28 Total 14,410

1.39 < 2 2022 CBC 506.2.2
F)
UL
UL
UL
00 0.34
00 0.33
00 0.33
(16) Class II Facility - exterior racks to which bicycles not number of racks.
(11) All spaces will be assigned.
(12) No additional guest parking required, see Density
(10) Per Density Bonus Law (State of California Gover
stop.
(14) Refer to plan sheet A2.1 for additional information vehicle has been provided and has access to service
(13) 1 per 25 spaces shall be sized to accommodate a
blic benefits.

ALLOWED

PROPOSED FIREWALL
AREA A

PROPOSED FIREWALL
AREA B
udes stair tower penthouse.

CALIFORNIA STREET
Copyright 2024 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates.

L-2
Project No. 05123

COURTYARD ENLARGEMENT PLAN

CONCEPTUAL PHASE
OCTOBER 4, 2024
vanderToolen Associates
700 Ygnacio Valley Rd.

Suite 100
Walnut Creek, CA 94596
tel+ 925.274.1305
hhhvandertoolenco^SCALE: 1/8" = 1'-0"
0'4'8'16'
Mountain View, California
334 SAN ANTONIO ROAD
NORTH

GAME TABLE FOR
AGES 13-17

FENCE AND GATE

CHILDREN'S PLAY AREA
AGES 2-12 (720 S.F.)

GATHERING SPACE WITH

BBQ, TABLES AND CASUAL

SEATING AREAS

BIKE RACKS
(14 BIKES)

DECIDUOUS

SPECIMEN TREE

PRIVACY SCREEN

PLANTING FOR UNITS

COLUMNAR

ACCENT TREE
BENCH

PROPOSED TREE LEGEND

TREESBOTANICAL NAMECONTWATER USE QTY

COMMON NAME
ACER PLATANOIDES 'CRIMSON SENTRY' 24"BOXMOD3

CRIMSON SENTRY NORWAY MAPLE
ACER RUBRUM 'OCTOBER GLORY'36"BOX MOD 4

RED MAPLE
ACER X FREEMANII `JEFFERSRED`36"BOXMOD3
AUTUMN BLAZE® FREEMAN MAPLE
CERCIS CANADENSIS TEXENSIS 'OKLAHOMA' 24"BOXMOD3

OKLAHOMA TEXAS REDBUD
PRUNUS CAROLINIANA 'COMPACTA'15 GALLOW16

COMPACT CAROLINA LAUREL CHERRY
TILIA TOMENTOSA 'STERLING'48"BOXLOW1

STERLING SILVER LINDEN

EXISTING TREEN/AN/A
#

PROPOSED SHRUB LEGEND
SHRUBS

SYMBOLBOTANICAL NAMECOMMON NAMESIZE
WATER
USE

NATIVE/

ADAPTIVEQTY
AZALEA RUTHERFORDIANA 'ALASKA' ALASKA AZALEA5 GAL MOD ADAPTIVE8 CAREX TUMULICOLABERKELEY SEDGE1 GAL LOW NATIVE250

CARPENTERIA CALIFORNICA
'ELIZABETH'BUSH ANEMONE5 GAL MOD NATIVE5
CHONDROPETALUM ELEPHANTINUM LARGE CAPE RUSH5 GAL LOW ADAPTIVE36 CHONDROPETALUM TECTORUM SMALL CAPE RUSH5 GAL LOW ADAPTIVE18 DIANELLA TASMANICA 'VARIEGATA' VARIEGATED FLAX LILY 5 GAL MOD ADAPTIVE29

GALVEZIA SPECIOSA 'FIRECRACKER'FIRECRACKER ISLAND
SNAPDRAGON5 GAL LOW NATIVE15
HEUCHERA MAXIMAISLAND ALUM ROOT1 GAL MOD NATIVE91
JUNCUS PATENS 'ELK BLUE'CALIFORNIA GRAY RUSH 1 GAL LOW NATIVE 111

LIRIOPE MUSCARI 'SILVERY SUNPROOF'SILVERY SUNPROOF
LILYTURF1 GAL MOD ADAPTIVE58
PODOCARPUS MACROPHYLLUS `MAKI`MAKI SHRUBBY YEW
PODOCARPUS15 GAL MOD ADAPTIVE13
POLYSTICHUM MUNITUMWESTERN SWORD FERN 5 GAL MOD NATIVE 27

SARCOCOCCA HOOKERIANA HUMILIS
'FRAGRANT MOUNTAIN'

FRAGANT MOUNTAIN
SWEETBOX5 GAL LOW ADAPTIVE9
WOODWARDIA FIMBRIATAGIANT CHAIN FERN5 GAL MOD NATIVE 22 TOTAL NATIVE PLANTINGS 75%
ENTRY
5 #1
#5
#6
#7
#8
#9
#10
10'-0" MIN.

PLANTING NOTES

1. THE PLANTING DESIGN FOR THE SITE IS DROUGHT TOLERANT AND CONSISTS OF A BALANCE OF EVERGREEN AND DECIDUOUS PLANTING AS WELL AS NATIVE AND ORNAMENTAL PLANTING.

2. PROPOSED TREE LOCATIONS ARE BASED ON PRELIMINARY UTILITY LOCATIONS. FINAL TREE LOCATIONS TO BE DETERMINED WHEN FINAL UTILITY LOCATIONS ARE PROVIDED. TREE PLACEMENT MAY BE ADJUSTED AND FINAL TREE COUNT MAY CHANGE.

3. ALL SHRUBS AND GROUNDCOVER MATERIAL SELECTED HAVE A WUCOLS WATER USE RATING OF VERY LOW TO MODERATE.

4. PROPOSED TREE CANOPIES ARE SHOWN AT 85% MATURE GROWTH DIAMETER IN ORDER TO ENSURE THERE IS SUFFICIENT ROOM FOR TREE GROWTH AND HEALTH.

5. ALL SHRUB / GROUNDCOVER PLANTING LOCATED WITHIN SIGHT VIEW TRIANGLE SHALL NOT EXCEED 36" IN HEIGHT.

Copyright 2024 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates.

L-3
Project No. 05123NORTH

PRELIMINARY PLANTING PLAN

CONCEPTUAL PHASE
OCTOBER 4, 2024
vanderToolen Associates
700 Ygnacio Valley Rd.

Suite 100
Walnut Creek, CA 94596
tel+ 925.274.1305
hhhvandertoolenco^SCALE: 1" = 10'-0"
0'5'10'20'
Mountain View, California
334 SAN ANTONIO ROAD

CALIFORNIA STREET

SAN ANTONIO ROAD
(E) 15" HERITAGE

TREE TO REMAIN
(E) 29" HERITAGE

TREE TO REMAIN
(E) 18" HERITAGE

TREE TO REMAIN
(E) TREE TO REMAIN(E) TREE TO REMAIN

PROPOSED SHRUB LEGEND
SHRUBS

SYMBOLBOTANICAL NAMECOMMON NAMESIZE
WATER
USE

NATIVE/

ADAPTIVEQTY
AZALEA RUTHERFORDIANA 'ALASKA' ALASKA AZALEA5 GAL MOD ADAPTIVE8 CAREX TUMULICOLABERKELEY SEDGE1 GAL LOW NATIVE 247

CARPENTERIA CALIFORNICA
'ELIZABETH'BUSH ANEMONE5 GAL MOD NATIVE5
CHONDROPETALUM ELEPHANTINUM LARGE CAPE RUSH5 GAL LOW ADAPTIVE36 CHONDROPETALUM TECTORUM SMALL CAPE RUSH5 GAL LOW ADAPTIVE18 DIANELLA TASMANICA 'VARIEGATA' VARIEGATED FLAX LILY 5 GAL MOD ADAPTIVE32

GALVEZIA SPECIOSA 'FIRECRACKER'FIRECRACKER ISLAND
SNAPDRAGON5 GAL LOW NATIVE15
HEUCHERA MAXIMAISLAND ALUM ROOT1 GAL MOD NATIVE91
JUNCUS PATENS 'ELK BLUE'CALIFORNIA GRAY RUSH 1 GAL LOW NATIVE 111

LIRIOPE MUSCARI 'SILVERY SUNPROOF'SILVERY SUNPROOF
LILYTURF1 GAL MOD ADAPTIVE58
PODOCARPUS MACROPHYLLUS `MAKI`MAKI SHRUBBY YEW
PODOCARPUS15 GAL MOD ADAPTIVE13
POLYSTICHUM MUNITUMWESTERN SWORD FERN 5 GAL MOD NATIVE 27

SARCOCOCCA HOOKERIANA HUMILIS
'FRAGRANT MOUNTAIN'

FRAGANT MOUNTAIN
SWEETBOX5 GAL LOW ADAPTIVE9
WOODWARDIA FIMBRIATAGIANT CHAIN FERN5 GAL MOD NATIVE 22 TOTAL NATIVE PLANTINGS 75%

COLUMNAR PLANTING

TO SCREEN UTILITIES

PROPOSED TREE LEGEND

TREESBOTANICAL NAMECONTWATER USE QTY

COMMON NAME
ACER PLATANOIDES 'CRIMSON SENTRY' 24"BOXMOD3

CRIMSON SENTRY NORWAY MAPLE
ACER RUBRUM 'OCTOBER GLORY'36"BOX MOD 5

RED MAPLE
ACER X FREEMANII `JEFFERSRED`36"BOXMOD3
AUTUMN BLAZE® FREEMAN MAPLE
CERCIS CANADENSIS TEXENSIS 'OKLAHOMA' 24"BOXMOD3

OKLAHOMA TEXAS REDBUD
PRUNUS CAROLINIANA 'COMPACTA'15 GALLOW16

COMPACT CAROLINA LAUREL CHERRY
TILIA TOMENTOSA 'STERLING'48"BOXLOW1

STERLING SILVER LINDEN
EXISTING TREEN/AN/A #
5 #1
#3
#2
#4
#5
#6
#7
#8
#9
#10

TREE CANOPY LEGEND

TREE CANOPY AT

MATURITY
10YR TREE CANOPY
5YR TREE CANOPY

TREE CANOPY AT

INSTALLATION

TREE CANOPY

COVERAGE TABLE
CANOPY COVERAGE*

EXISTING OFF-SITE TREE

TO BE REMOVED

AT INSTALLATION
5 TO 10 YEARS

AT MATURITY

TOTAL AREA
1,128 SF
95 SF
1,822 SF
2,781 SF
% OF SITE

4.16%

0.35%

6.73%

10.27%
TOTAL SITE AREA: 27,090 SF
*CANOPY AREA MEASURED WHERE CANOPY

OVERHANGS PROJECT SITE AREA

EXISTING TREE REMOVALS
TREE # PER

ARBORIST REPORT
#2
#3
#4

BOTANICAL NAME

LIQUIDAMBAR STYRACIFLUA

LIQUIDAMBAR STYRACIFLUA

PLATANUS ACERIFOLIA

COMMON NAME

SWEET GUM

SWEET GUM

LONDON PLANE TREE
NOTE: SEE ARBORIST REPORT PREPARED BY KIELTY ARBORIST SERVICES.

SIZE

12.7" DIA. (39.9" CIRC.)

12.1" DIA. (38.0" CIRC.)

13.4" DIA. (42.1" CIRC.)

HERITAGE
TREE
NO
NO
NO

TREE REMOVAL &

MITIGATION TABLE

EXISTING TREE

CLASSIFICATION

HERITAGE TREES
(>48" CIRCUMFERENCE)

NON-HERITAGE TREES

REMOVED
0 3

PROVIDED

REPLACEMENT
0 (6) 24" BOX TREE,
(8) 36" BOX TREE &
(1) 48' BOX TREE
NOTE: SEE ARBORIST REPORT PREPARED BY KIELTY ARBORIST SERVICES

REQUIRED

REPLACEMENT
0 (2:1 RATIO)
3 (1:1 RATIO)
*NOTES:

1. TOTAL SQUARE FOOTAGE NOTED ABOVE IS OF THE GROUND LEVEL PROPOSED TREE CANOPIES. EXISTING TREES ON ADJACENT PROPERTIES & PROPOSED STREET TREES OUTSIDE THE PROPERTY LINE ARE NOT INCLUDED.

2. CITY REQUIREMENTS STATE THAT THERE SHALL BE NO NET LOSS OF TREE CANOPY COVERAGE WITH NEW IMPROVEMENTS. THE PROPOSED PLAN PROVIDES 1,653 SF NET GAIN OF TREE CANOPY COVERAGE ONCE PROPOSED TREES REACH MATURITY.

3. ALL PRUNING SHALL BE COMPLETED BY A CERTIFIED ARBORIST OR TREE WORKER, NOT BY CONSTRUCTION PERSONNEL. PRUNING SHALL ADHERE TO THE LATEST EDITION OF THE ANSI Z133 AND A300 STANDARDS AS WELL AS

THE BEST MANAGEMENT PRACTICES - TREE PRUNING PUBLISHED BY THE INTERNATIONAL SOCIETY OF ARBORICULTURE. CALIFORNIA STREET

SAN ANTONIO ROAD
(E) STREET TREE

TO BE REMOVED
(E) 15" HERITAGE

TREE TO REMAIN
(E) STREET TREE

TO BE REMOVED
(E) 29" HERITAGE

TREE TO REMAIN
(E) 18" HERITAGE

TREE TO REMAIN
(E) TREE TO REMAIN(E) TREE TO REMAIN
Copyright 2024 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates.

L-4
Project No. 05123NORTH
vanderToolen Associates
700 Ygnacio Valley Rd.

Suite 100
Walnut Creek, CA 94596
tel+ 925.274.1305
hhhvandertoolenco^SCALE: 1" = 10'-0"
0'5'10'20'
Mountain View, California
334 SAN ANTONIO ROADPRELIMINARY TREE AND CANOPY PLAN

CONCEPTUAL PHASE
OCTOBER 4, 2024
NOTE: ESTIMATED TREE CANOPY SIZE IS BASED ON GROWTH
DATA AVAILABLE FROM SELECTREE (selectree.calpoly.edu)

AND CURRENT AVAILABLE NURSERY STOCK

PROPOSED TREE LEGEND

TREESBOTANICAL NAMECONTWATER USE QTY

COMMON NAME
ACER PLATANOIDES 'CRIMSON SENTRY' 24"BOXMOD3

CRIMSON SENTRY NORWAY MAPLE
ACER RUBRUM 'OCTOBER GLORY'36"BOX MOD 5

RED MAPLE
ACER X FREEMANII `JEFFERSRED`36"BOXMOD3
AUTUMN BLAZE® FREEMAN MAPLE
CERCIS CANADENSIS TEXENSIS 'OKLAHOMA' 24"BOXMOD3

OKLAHOMA TEXAS REDBUD
PRUNUS CAROLINIANA 'COMPACTA'15 GALLOW16

COMPACT CAROLINA LAUREL CHERRY
TILIA TOMENTOSA 'STERLING'48"BOXLOW1

STERLING SILVER LINDEN
EXISTING TREEN/AN/A #
5 EPLAY EQUIPMENT FOR AGES 2-12

AB ENHANCED PAVING
D

VIEW FENCE AND SECURITY GATE AT COURTYARD
Copyright 2024 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates.

L-5
Project No. 05123

SITE IMAGERY

CONCEPTUAL PHASE
OCTOBER 4, 2024
vanderToolen Associates
700 Ygnacio Valley Rd.

Suite 100
Walnut Creek, CA 94596
tel+ 925.274.1305
hhhvandertoolenco^
Mountain View, California
334 SAN ANTONIO ROAD

BIKE RACKS

CONCRETE WITH SCORELINES TO CREATE PATTERNSRUBBERIZED SURFACE WITH

PLAYFUL PATTERN AND COLORS

COURTYARD SITE FURNITURE

CASUAL SEATING TABLE AND CHAIRS

GAME TABLES

BENCH STYLE SEATING
C

CLIMBER

CHILDREN'S SEATING

PICNIC TABLES

FPLANTER AT ENTRY

3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE
3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE
2CY NARROW

LOOSE FRONT

LOAD BIN

CONTAINER

RECYCLING
3CY NARROW

LOOSE FRONT

LOAD BIN
PAPER

RECYCLING
2CY NARROW

LOOSE FRONT

LOAD BIN

CONTAINERRECYCLING
MC P W
64G CART

COMPOST
64G CART

COMPOST
3CY NARROW

LOOSE FRONT

LOAD BIN
PAPER

RECYCLING
8FT ROLL UP DOOR WITH

KEYPAD ACCESS
64G CART
COMPOST64G CART

COMPOST
PAPER

RECYCLING
WASTE

CONTAINER

RECYCLING
3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE
BB
BB
BB
WP
WP
WP WP
BB
BB
BB
BB
WP
WP
WP
BB WP
WP
BB
BB
BB
WP
WPWPWP
WP
WP
WP
WP
WP

CALIFORNIA STREET

SAN ANTONIO ROAD
Copyright 2024 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates.

L-8
Project No. 05123NORTH

PRELIMINARY LIGHTING PLAN

CONCEPTUAL PHASE
OCTOBER 4, 2024
vanderToolen Associates
700 Ygnacio Valley Rd.

Suite 100
Walnut Creek, CA 94596
tel+ 925.274.1305
hhhvandertoolenco^SCALE: 1" = 10'-0"
0'5'10'20'
Mountain View, California
334 SAN ANTONIO ROAD

LIGHT FIXTURE SCHEDULE
SYMBOL CATALOG #HEIGHT
42" HIGH

DESCRIPTION

SHIELDED BOLLARD LIGHTS

NAWALL PAC LIGHTS VWM LED - VOLTAIRE MINI

ARCHITECTURAL WALL PACK
VWM-H-L20/740-T3-DBZ-SDGL-XX-DIM-UNV
THE SITE LIGHTING WILL SERVE AS BOTH FUNCTIONAL LIGHTING AS WELL AS ACCENT. LIGHTING WILL MEET OR EXCEED THE MINIMUM FOOT-CANDLE LEVELS REQUIRED BY THE CITY OF MOUNTAIN VIEW. THE STYLE OF THE FIXTURES ARE PROPOSED TO COMPLEMENT THE ARCHITECTURAL CHARACTER.

THE BUILDING ENTRIES WILL BE LIT VIA ARCHITECTURALLY MOUNTED AREA DOWNLIGHTS.

COURTYARD: THE COURTYARD IS INTENDED TO BE LIT USING WALL MOUNTED DOWNLIGHTS AT THE ENTRIES TO THE SPACE AND BOLLARDS FOR WALKS. BOLLARD LIGHT IS DIRECTIONAL SO GLARE INTO UNIT WINDOW IS MINIMIZED.

SIDE WALK ALONG SAN ANTONIO ROAD AND CALIFORNIAL STREET: THE SIDEWALK IS INTENDED TO BE LIT WITH BOLLARDS WITH 360-DEGREE THROW, THE WALK AND ADJACENT PLANTING AREAS ARE ILLUMINATED.

LIGHT LOCATIONS ARE SCHEMATIC FINAL LOCATIONS SHALL BE PER PHOTOMETRIC PLAN.

LIGHTING CONCEPT STATEMENT
42" HIGHBOLLARD LIGHTS

RELOCATED STREET
LIGHT

PER CITY OF MOUNTAIN

VIEW STANDARDS
#84 238

11.5 W 1650LM
#84 063

19.4 W 1363LM
BB
BB
WP
(OR EQUIVALENT)
(OR EQUIVALENT)
(OR EQUIVALENT)
H.E. WILLIAMS, INC.

BEGA
BEGA
COURTYARD BOLLARD (180 DEGREE)
SIDEWALK BOLLARD (360 DEGREE)

NARECESSED WALL LIGHT

OPTIONS

WALL LIGHT
5 HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A7.1
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

GROUND FLOOR

EGRESS PLAN
3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE
3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE
2CY NARROW

LOOSE FRONT

LOAD BIN

CONTAINER

RECYCLING
3CY NARROW

LOOSE FRONT

LOAD BIN
PAPER

RECYCLING
2CY NARROW

LOOSE FRONT

LOAD BIN

CONTAINER

RECYCLING
MC
P W
64G CART

COMPOST
64G CART

COMPOST
3CY NARROW

LOOSE FRONT

LOAD BIN
PAPER

RECYCLING
8FT ROLL UP DOOR WITH

KEYPAD ACCESS
64G CART

COMPOST
64G CART

COMPOST
PAPER

RECYCLING
WASTE

CONTAINER

RECYCLING
3CY NARROW

LOOSE FRONT

LOAD BIN
WASTE

EXIT SEPARATION
54'-9 1/2"

EXIT SEPARATION
134'-6"
= 44'-11" MIN BTW EXITS
142'-0"
= 47'-9" MIN. BETWEEN EXITS
109'-9 1/4"

EGRESS DOOR
TOTAL OCCUPANT LOAD = 57
REQ'D DOOR WIDTH (.2) = 11.4"
DOOR WIDTH PROVIDED = 36"

EGRESS DOOR
TOTAL OCCUPANT LOAD = 16
REQ'D DOOR WIDTH (.2) = 3.2"
DOOR WIDTH PROVIDED = 36"

EGRESS DOOR
TOTAL OCCUPANT LOAD = 13
REQ'D DOOR WIDTH (.2) = 2.6"
DOOR WIDTH PROVIDED = 36"

EGRESS DOOR
TOTAL OCCUPANT LOAD = 24
REQ'D DOOR WIDTH (.2) = 4.8"
DOOR WIDTH PROVIDED = 36"
90'-7"

EXIT ACCESS TRAVEL DISTANCE
91'-7"

EXIT ACCESS TRAVEL DISTANCE

EGRESS GATE
TOTAL OCCUPANT LOAD = 118
REQ'D DOOR WIDTH (.2) = 23.6"
DOOR WIDTH PROVIDED = 36"

EGRESS GATE
TOTAL OCCUPANT LOAD = 104
REQ'D DOOR WIDTH (.2) = 20.8"
DOOR WIDTH PROVIDED = 36"
32'-9"

EXIT SEPARATION
91'-9 1/2"
30'-7" MIN. BETWEEN EXITS

STAIR B
- ACCESSIBLE MEANS OF EGRESS
TOTAL OCCUPANT LOAD = 39
REQ'D DOOR WIDTH (.2) = 7.8"
DOOR WIDTH PROVIDED = 36"
REQ'D STAIR WIDTH (.3) = 11.7"
STAIR WIDTH PROVIDED = 48"

STAIR A
- ACCESSIBLE MEANS OF EGRESS
TOTAL OCCUPANT LOAD = 49
REQ'D DOOR WIDTH (.2) = 9.8"
DOOR WIDTH PROVIDED = 36"
REQ'D STAIR WIDTH (.3) = 14.7"
STAIR WIDTH PROVIDED = 48"
334 SAN ANTONIO ROAD, MOUNTAINVIEW

PROJECT CLIENT CRP AFFORDABLE
JOB NO.
1648.002
05-02-2023
DATE
5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
0 32
16 8
SCALE 1/8" = 1'-0"
0 16
8 4
5 HDR PARCELS, DELTA SHORES
RUSSELL SQUARE CONSULTING 5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
1648.002

10.04.2024
JOB NO.

DATE
A7.2
334 SAN ANTONIO ROAD | MOUNTAIN VIEW, CA

CRP AFFORDABLE HOUSING AND COMMUNITY DEVELOPMENT
N

TYPICAL SECOND

THROUGH EIGHTH

FLOOR EGRESS
PLAN
51'-3"

COMMON PATH OF TRAVEL

COMMON PATH OF TRAVEL
130'-1"
133'-8"

EXIT ACCESS TRAVEL DISTANCE
82'-9"

EXIT ACCESS TRAVEL DISTANCE
90'-8"
126'-11"

EXIT SEPARATION
166'-6"

EXIT ACCESS SEPARATION
22'-3"

DEAD END
54'-1"

EXIT ACCESS TRAVEL DISTANCE

EXIT ACCESS TRAVEL DISTANCE
122'-10"
= 41'-0" MIN BTW EXITS
144'-5 1/2"
= 48'-2" MIN BTW EXITS
166'-6"

EXIT ACCESS SEPARATION

STAIR A
- ACCESSIBLE MEANS OF EGRESS
TOTAL OCCUPANT LOAD = 49
REQ'D DOOR WIDTH (.2) = 9.8"
DOOR WIDTH PROVIDED = 36"
REQ'D STAIR WIDTH (.3) = 14.7"
STAIR WIDTH PROVIDED = 48"

STAIR B
- ACCESSIBLE MEANS OF EGRESS
TOTAL OCCUPANT LOAD = 39
REQ'D DOOR WIDTH (.2) = 7.8"
DOOR WIDTH PROVIDED = 36"
REQ'D STAIR WIDTH (.3) = 11.7"
STAIR WIDTH PROVIDED = 48"
D
W/D
W/D
W
W/D
W/D
W/D
PANTRY
5'-0" ADA

TURN CIRCLE
PAPER

RECYCLING
WASTE

CONTAINER

RECYCLING
334 SAN ANTONIO ROAD, MOUNTAINVIEW

PROJECT CLIENT

CRP AFFORDABLE
JOB NO.
1648.002
05-02-2023
DATE
5865 Owens Drive
Pleasanton, CA 94588
925-251-7200
0 32
16 8
SCALE 1/8" = 1'-0"
0 16
8 4
4 UP

TRASHROOM

ATTEMPATTEMP

HAULER TO SERVICE BINS

VIA PUSH/PULL SERVICE

PICK-UP LOCATION TO BE

RED CURBED WITH NO

PARKING SIGNAGE
PROVIDED FOR 40FT

AS SHOWN

PULLOUT SERVICE BY HAULER
TR1.2

AMERICAN TRASH MANAGEMENT
1900 POWELL STREET, SUITE 220
EMERYVILLE, CALIFORNIA 94608
P: 415.292.5400
F: 415.292.5410
[email protected]

DRAWING TITLE
PROJECT NO.

PROJECT
PH
DRAWN

APPROVED
DATE
SCALE
DRAWING NO.

DU
10/04/2024

CONSULTANT

ARCHITECT

OWNER / DEVELOPER
NO.DATEISSUED BY ISSUE / REVISION

DAHLIN GROUP
334 SAN ANTONIO ROAD

MOUNTAIN VIEW, CA
XXXXX
1/8" = 1'-0"1PUSH PULL SERVICE
5 5

← All documents from this meeting