Jurisdiction Mountain View
Reporting Year 2024
Housing Element Planning Period 6th Cycle
Current Year
Deed Restricted 84
Non-Deed
Restricted 17
Deed Restricted 0
Non-Deed
Restricted 17
Deed Restricted 1
Non-Deed
Restricted 17
81 217
Units by Structure Type Entitled Permitted Completed
Single-family Attached 0 43 50
Single-family Detached 25 32 28
2 to 4 units per structure 0 0 0
5+ units per structure 1006 85 49
Accessory Dwelling Unit 53 57 49
Mobile/Manufactured Home 0 0 0
Total 1084 217 176
Infill Housing Developments and Infill Units Permitted # of Projects Units 133 217
0 0
87 4,072
1,032
0 0
0 Total Housing Applications Submitted:
Number of Proposed Units in All Applications Received:
Total Housing Units Approved:
Total Housing Units Disapproved:
Total Units
Housing Applications Summary
Use of SB 423 Streamlining Provisions - Applications
Note: Units serving extremely low-income households are included in the very low-income permitted units totals Number of SB 423 Streamlining Applications
Above Moderate
Indicated as Infill
Not Indicated as Infill
Building Permits Issued by Affordability Summary
Income Level
(Jan. 1 - Dec. 31)
01/31/2023 - 01/31/2031
Number of SB 423 Streamlining Applications Approved
Very Low
Low
Moderate
Attachment 1
Income Rental Ownership Total
Very Low 0 0 0
Low 0 0 0
Moderate 0 0 0
Above Moderate 0 0 0
Total 0 0 0
Streamlining Provisions Used - Permitted Units # of Projects Units SB 9 (2021) - Duplex in SF Zone 0 0
SB 9 (2021) - Residential Lot Split 12 12
AB 2011 (2022) 0 0
SB 6 (2022) 0 0
SB 423 (2023) 0 0
Ministerial and Discretionary Applications # of Applications Units Ministerial 74 73
Discretionary 13 3999
Density Bonus Applications and Units Permitted
Number of Applications Submitted Requesting a Density Bonus 6 Number of Units in Applications Submitted Requesting a Density Bonus 418 Number of Projects Permitted with a Density Bonus 1
Number of Units in Projects Permitted with a Density Bonus 85 Housing Element Programs Implemented and Sites Rezoned Count 62 0
Programs Implemented
Sites Rezoned to Accommodate the RHNA
Units Constructed - SB 423 Streamlining Permits
Attachment 1
Jurisdiction Mountain View ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Date
Application
Submitted
Total
Approved
Units by
Project
Total
Disapproved
Units by
Project
Streamlining Application
Status Project Type Notes
2 3 4 6 7 8 9 11 12 13
Prior APN+ Current APN Street Address P roject Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Date Application
Submitted
(see
instructions)
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low-Income
Deed
Restricted
Low-Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income
Non Deed
Restricted
Above
Moderate-
Income
Total PROPOSED
Units by Project
Total
APPROVED
Units by project
Total
DISAPPROVED
Units by Project
Please select state
streamlining
provision/s the
application was
submitted pursuant
to.
Did the housing
development
application seek
incentives or
co
ncessions
pursuant to
Government Code
section 65915?
Were incentives
or concessions
requested
pursuant to
G
overnment
Code section
65915 approved?
Please indicate
the status of the
application.
Is the project
considered a
ministerial project
or discretionary
project?
Notes+
Summary Row: Start Data Entry Below 158 14 670 14 10 14 3192 4072 1032 0 160-60-013 675-685 E Middlefield
Rd 675-685 E Middlefield Rd PL-2022-259 / PL-6535 5+ R 4/23/2024 102 48 686 836 836 0 NONE No N/A Approved Discretionary Approved by City Council 12/17/2024
160-32-002, 160-32-
001 294-296 Tyrella Ave 294-296 Tyrella Ave PL-2023-102 / PL-7462 5+ O 2/16/2024 17 68 85 0 0 NONE No N/A Pending Discretionary Builders's Remedy project; scheduled for hearings in 2025
116-13-030 1500 N Shoreline Blvd 1500 N Shoreline Blvd PL-2023-128 5+ R 2/29/2024
383 1,531 1914 0 0 NONE No N/A Pending Discretionary
Builders's Remedy project
154-21-007, 154-21-
008, 154-21-009, 154-
21-010, 154-21-011,
154-21-012, 154-21-
013
1919-1933 Gamel
Way, 574 Escuela Ave
& 1970 Latham St
1919-1933 Gamel Way, 574
Escuela Ave & 1970 Latham
St
PL-2023-154 / PL-5813
5+ O
11/4/2024
6 36 174 216 0 0 NONE No N/A Pending Discretionary
Builder's Remedy project
148-16-009, 148-16-
008 2645-2655 Fayette Dr 2645-2655 Fayette Dr PL-2023-169 5+ O
2/23/2024
4 10 56 70 70 0 NONE No N/A Approved Discretionary
Builder's Remedy project; Approved
by City Council 11/12/2024
153-02-041, 153-02-
040, 153-02-039
901, 913, and 987 N
Rengstorff Ave
901, 913, and 987 N
Rengstorff Ave PL-2023-174 5+ R
1/4/2024
91 364 455 0 0 NONE No N/A Pending Discretionary
Builder's Remedy project
161-05-003, 161-05-
004, 161-05-005, 161-
05-006, 161-05-007
301, 309, 317, and 323
Moorpark Way; and
301 Sylvan Ave
301/317 Moorpark Wy PL-2023-204 / PL-6215
SFD O
9/6/2024
2 20 22 0 0 NONE Yes N/A Pending Discretionary
Scheduled for hearings in 2025
153-24-016 400 Moffett Blvd 400 Moffett Blvd PL-2024-001 / PL-7243 5+ R 10/30/2024
17 1 157 175 0 0 NONE Yes N/A Pending Discretionary
153-18-026, 153-18-
031
922 and 944 San
Leandro Ave 922 & 944 San Leandro Ave PL-2023-240 / PL-6773 SFA O 10/10/2024
3 5 30 38 0 0 NONE Yes N/A Pending Discretionary
158-06-007, 158-06-
011
969 Hope St and 679
Fairmont Ave
969 Hope St and 679
Fairmont Ave PL-2024-031 / PL-7897 5+ O
12/3/2024
5 3 28 36 0 0 NONE Yes N/A Pending Discretionary
160-32-006; 160-32-
007 266 & 272 Tyrella Ave 266 & 272 Tyrella Ave PL-2023-130 / PL-7343 5+ O 10/10/2024
5 42 47 0 0 NONE Yes N/A Pending Discretionary
148-15-020 334 San Antonio Rd 334 San Antonio Rd PL-2024-002 / PL-6028 5+ R 7/12/2024
22 77 1 100 100 0 NONE Yes Yes Approved Discretionary SB 330 100% affordable project with manager unit
160-37-005 198 Easy St 198 Easy St PL-2024-018 SFD O 8/19/2024 5 5 0 0 NONE No N/A Pending Discretionary Scheduled for hearing in 2025 153-26-012 0 Central Avenue 0 Central Ave PL-2024-041 SFD O 4/10/2024 0 0 0 0 NONE No N/A Approved Ministerial SB 9 Urban Lot Split 153-26-011 890 Central Avenue 890 Central Avenue PL-2024-042 SFD O 4/10/2024 0 0 0 0 NONE No N/A Approved Ministerial SB 9 Urban Lot Split 154-31-032 1412 Snow St 1412 Snow St PL-6174 SFD O 10/3/2024 0 0 0 0 NONE No N/A Approved Ministerial SB9 Urban Lot Split 160-26-031 192 E MIDDLEFIELD
RD 2024-3335 ADU R
12/23/2024
1 1 0 0 NONE No N/A Pending Ministerial
Applications for new ADUs and SFDs
158-28-022 56 ELDORA DR 2024-2730 ADU R 10/8/2024 1 1 1 0 NONE No N/A Approved Ministerial ADU affordability based on ABAG 197-41-059 166 MARTENS AV 2024-0182 ADU R 1/24/2024 1 1 0 0 NONE No N/A Pending Ministerial 147-34-074 2426 WHITNEY DR 2024-0651 ADU R 3/25/2024 1 1 1 0 NONE No N/A Approved Ministerial 154-08-033 317 PALO ALTO AV 2024-2183 ADU R 8/14/2024 1 1 0 0 NONE No N/A Pending Ministerial 153-21-059 842 SAN LUCAS AV 2024-2760 ADU R 10/10/2024 1 1 0 0 NONE No N/A Pending Ministerial 153-02-018 1979 PLYMOUTH ST 2024-1836 ADU R 7/18/2024 1 1 0 0 NONE No N/A Pending Ministerial 189-05-099 1679 LEE DR 2024-2936 ADU R 10/28/2024 1 1 0 0 NONE No N/A Pending Ministerial 160-02-012 719 LEONG DR 2024-3154 ADU R 11/21/2024 1 1 0 0 NONE No N/A Pending Ministerial 193-18-023 637 LOLA LN 2024-2214 ADU R 8/19/2024 1 1 0 0 NONE No N/A Pending Ministerial 158-28-069 64 PAUL AV 2024-0805 ADU R 4/12/2024 1 1 1 0 NONE No N/A Approved Ministerial 189-04-070 1326 ISABELLE AV 2024-2236 ADU R 8/20/2024 1 1 1 0 NONE No N/A Approved Ministerial 160-10-048 77 DEVONSHIRE AV 2024-1250 ADU R 5/23/2024 1 1 1 0 NONE No N/A Approved Ministerial 150-11-003 1891 VASSAR AV 2024-2526 ADU R 9/10/2024 1 1 1 0 NONE No N/A Approved Ministerial 147-33-042 2477 TAMALPAIS ST 2024-1014 ADU R 5/1/2024 1 1 1 0 NONE No N/A Approved Ministerial 150-11-035 1845 PEACOCK AV 2024-2715 ADU R 10/7/2024 1 1 0 0 NONE No N/A Pending Ministerial 154-03-027 1600 VILLA ST 2024-1069 ADU R 5/6/2024 2 2 0 0 NONE No N/A Pending Ministerial 170-10-006 1058 KAREN WY 2024-2773 ADU R 10/10/2024 1 1 1 0 NONE No N/A Approved Ministerial 160-04-003 620 ALAMO CT 42 2024-1927 ADU R 7/26/2024 1 1 1 0 NONE No N/A Approved Ministerial 160-04-003 620 ALAMO CT 40 2024-1928 ADU R 7/26/2024 1 1 1 0 NONE No N/A Approved Ministerial 189-27-014 1168 FORDHAM WY 2024-2452 ADU R 9/5/2024 1 1 1 0 NONE No N/A Approved Ministerial 154-09-022 200 MOUNTAIN VIEW
AV
2024-0547 ADU R
3/14/2024
1 1 1 0 NONE No N/A Approved Ministerial
153-21-005 777 SAN CARRIZO
WY
2024-0619 ADU R
3/21/2024
1 1 0 0 NONE No N/A Pending Ministerial
154-11-015 315 HIGDON AV 2024-1702 ADU R 7/8/2024 2 2 0 0 NONE No N/A Pending Ministerial 150-16-025 989 BURGOYNE ST 2024-1231 ADU R 5/22/2024 1 1 1 0 NONE No N/A Approved Ministerial 160-31-035 136 GLADYS AV A 2024-2736 ADU R 10/8/2024 1 1 0 0 NONE No N/A Pending Ministerial 193-06-002 1046 NILDA AV 2024-2789 ADU R 10/14/2024 1 1 1 0 NONE No N/A Approved Ministerial 193-05-008 1092 PETIE WY 2024-2552 ADU R 9/13/2024 1 1 1 0 NONE No N/A Approved Ministerial 197-35-007 13396 PASTEL LN 2024-1963 ADU R 7/30/2024 1 1 1 0 NONE No N/A Approved Ministerial 148-38-082 2177 STANFORD AV 2024-3324 ADU R 12/6/2024 1 1 1 0 NONE No N/A Approved Ministerial 193-16-011 1566 GRETEL LN 2024-3452 ADU R 12/19/2024 1 1 0 0 NONE No N/A Pending Ministerial 154-10-044 286 PETTIS AV 2024-3130 ADU R 11/18/2024 1 1 0 0 NONE No N/A Pending Ministerial 189-31-145 1115 EL MONTE AV 2024-1891 ADU R 7/23/2024 1 1 1 0 NONE No N/A Approved Ministerial 158-24-047 696 CHURCH ST 2024-1450 ADU R 6/11/2024 1 1 1 0 NONE No N/A Approved Ministerial 197-24-052 2731 FAIRBROOK DR 2024-3186 ADU R
11/21/2024
1 1 0 0 NONE No N/A Pending Ministerial
170-08-053 1047 CLARK AV 2024-2629 SFD O 9/25/2024 1 1 0 0 NONE No N/A Pending Ministerial 158-30-026 395 LORETO ST 2024-2191 SFD O 8/15/2024 1 1 0 0 NONE No N/A Pending Ministerial 158-04-028 150 CENTRE ST 2024-3454 SFD O 12/19/2024 1 1 0 0 NONE No N/A Pending Ministerial 158-01-010 89 CENTRE ST 2024-2643 SFD O 6/24/2024 1 1 1 0 NONE No N/A Approved Ministerial 154-09-034 1390 W DANA ST 2024-0951 SFD O 4/25/2024 1 1 0 0 NONE No N/A Pending Ministerial 150-11-003 1893 VASSAR AV 2024-0462 SFD O 3/6/2024 1 1 1 0 NONE No N/A Approved Ministerial 197-27-031 2580 WESTFORD WY 2024-1856 SFD O
7/19/2024
1 1 0 0 NONE No N/A Pending Ministerial
148-38-032 2128 UNIVERSITY AV 2024-2916 SFD O
10/25/2024
1 1 0 0 NONE No N/A Pending Ministerial
150-10-021 246 FARLEY ST 2024-0103 SFD O 1/15/2024 1 1 1 0 NONE No N/A Approved Ministerial 189-27-014 1166 FORDHAM WY 2024-0120 SFD O 1/17/2024 1 1 1 0 NONE No N/A Approved Ministerial 170-10-006 1060 KAREN WY 2024-0624 SFD O 3/21/2024 1 1 1 0 NONE No N/A Approved Ministerial 197-08-004 1008 BRYANT AV 2024-0840 SFD O 4/17/2024 1 1 0 0 NONE No N/A Pending Ministerial 189-04-062 1033 MARILYN DR 2024-1589 SFD O 6/25/2024 1 1 1 0 NONE No N/A Approved Ministerial 189-09-079 880 YARDIS CT 2024-2360 SFD O 8/28/2024 1 1 0 0 NONE No N/A Pending Ministerial 189-27-016 1182 FORDHAM WY 2024-2061 SFD O 8/5/2024 1 1 1 0 NONE No N/A Approved Ministerial 148-07-029 298 MONROE DR 2024-3300 SFD O 12/4/2024 1 1 0 0 NONE No N/A Pending Ministerial 154-24-015 1678 LATHAM ST 2024-2661 SFD O 9/27/2024 1 1 0 0 NONE No N/A Pending Ministerial 189-55-064 1922 MIRAMONTE
AV 2024-2469 SFD O
9/6/2024
1 1 0 0 NONE No N/A Pending Ministerial
193-03-016 992 BORANDA AV 2024-3036 SFD O 12/23/2024 1 1 0 0 NONE No N/A Pending Ministerial 193-19-009 1655 BEGEN AV 2024-1988 SFD O 8/1/2024 1 1 0 0 NONE No N/A Pending Ministerial 170-07-005 1175 BLACKFIELD
WY 2024-2722 SFD O
10/7/2024
1 1 0 0 NONE No N/A Pending Ministerial
189-05-008 1011 BARBARA AV 2024-2609 SFD O 9/23/2024 1 1 0 0 NONE No N/A Pending Ministerial 189-31-022 1538 MELBA CT 2024-1938 SFD O 7/29/2024 1 1 0 0 NONE No N/A Pending Ministerial 150-08-025 700 FARLEY ST 2024-2122 SFD O 8/9/2024 1 1 0 0 NONE No N/A Pending Ministerial 150-13-009 1779 WAGNER AV 2024-2965 SFD O 10/30/2024 1 1 0 0 NONE No N/A Pending Ministerial 150-16-023 957 BURGOYNE ST 2024-2599 SFD O 9/20/2024 1 1 0 0 NONE No N/A Pending Ministerial 154-24-015 1678 LATHAM ST 2024-2661 ADU R 9/27/2024 1 1 0 0 NONE No N/A Pending Ministerial 189-55-064 1922 MIRAMONTE
AV 2024-2469 ADU R
9/6/2024
1 1 0 0 NONE No N/A Pending Ministerial
193-03-016 992 BORANDA AV 2024-3036 ADU R 12/23/2024 1 1 0 0 NONE No N/A Pending Ministerial 193-19-009 1655 BEGEN AV 2024-1988 ADU R 8/1/2024 1 1 0 0 NONE No N/A Pending Ministerial 170-07-005 1175 BLACKFIELD
WY 2024-2722 ADU R
10/7/2024
1 1 0 0 NONE No N/A Pending Ministerial
189-05-008 1011 BARBARA AV 2024-2609 ADU R 9/23/2024 1 1 0 0 NONE No N/A Pending Ministerial 189-31-022 1538 MELBA CT 2024-1938 ADU R 7/29/2024 1 1 0 0 NONE No N/A Pending Ministerial 150-08-025 700 FARLEY ST 2024-2122 ADU R 8/9/2024 1 1 0 0 NONE No N/A Pending Ministerial 150-13-009 1779 WAGNER AV 2024-2965 ADU R 10/30/2024 1 1 0 0 NONE No N/A Pending Ministerial 150-16-023 957 BURGOYNE ST 2024-2599 ADU R 9/20/2024 1 1 0 0 NONE No N/A Pending Ministerial 0 0
0 Table A
Cells in grey contain auto-calculation formulas
51 Project Identifier Unit Types Proposed Units - Affordability by Household Incomes Density Bonus Law Applications
10 Housing Development Applications Submitted
Attachment 1
Table A2
2 3 5 6
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Summary Row: Start Data Entry Below 128 17 135 17 1 17 769 1084 15431029 662 PALO ALTO AV 2020-3342 ADU R 0
15806022 910 BUSH ST 2022-1178 ADU R 0
15806022 912 BUSH ST 2022-2930 ADU R 0
17009012 1174 CLARK AV 2023-2000 ADU R 0
18925124 1644 YALE DR 2023-1773 ADU R 0
19302008 697 STAMM AV 2020-2701 ADU R 0
16104010 105 MARGO DR 2021-3208 SFD O 0
16019131 125 FLYNN AV 186 E Middlefield Rd 2019-1370 SFA O 0 16019131 127 FLYNN AV 186 E Middlefield Rd 2019-1371 SFA O 0 16019131 135 FLYNN AV 186 E Middlefield Rd 2019-1374 SFA O 0 16019131 137 FLYNN AV 186 E Middlefield Rd 2019-1373 SFA O 0 16019131 139 FLYNN AV 186 E Middlefield Rd 2019-1372 SFA O 0 16019131 145 FLYNN AV 186 E Middlefield Rd 2019-1378 SFA O 0 16019131 147 FLYNN AV 186 E Middlefield Rd 2019-1377 SFA O 0 16019131 149 FLYNN AV 186 E Middlefield Rd 2019-1375 SFA O 0 15844039 190 HORIZON AV 2022-1806 SFD O 0
15401006 208 ESCUELA AV 2019-4021 SFD O 0
15401034 234 ESCUELA AV 234 ESCUELA AV 2023-3107 ADU R 0 15401034 234 ESCUELA AV 234 ESCUELA AV 2023-3110 ADU R 0 15401034 234 ESCUELA AV 234 ESCUELA AV 2023-3111 ADU R 0 15401034 234 ESCUELA AV 234 ESCUELA AV 2023-3112 ADU R 0 15401034 234 ESCUELA AV 234 ESCUELA AV 2023-3113 ADU R 0 15401034 234 ESCUELA AV 234 ESCUELA AV 2023-3114 ADU R 0 15401034 234 ESCUELA AV 234 ESCUELA AV 2023-3105 ADU R 0 15401034 234 ESCUELA AV 234 ESCUELA AV 2023-3109 ADU R 0 15401034 234 ESCUELA AV 234 ESCUELA AV 2023-3106 ADU R 0 16028010 252 N WHISMAN RD 2022-1777 ADU R 0
15328017 260 ELMWOOD ST 2019-4034 SFD O 0
19741046 272 CARMELITA DR 2023-0354 ADU R 0
19741046 274 CARMELITA DR 2022-1002 SFD O 0
14838072 288 FAIR OAKS ST 2023-3232 ADU R 1 4/2/2024 1
14716101 331 ALDEAN AV 2023-1346 ADU R 0
19741024 353 CARMELITA DR 2021-0445 SFD O 0
19741024 357 CARMELITA DR 2021-0446 ADU R 0
16104010 525 ALICE AV 2023-0151 ADU R 0
15806052 555 YOSEMITE AV 2023-0775 SFD O 0
15805077 686 EHRHORN AV 2019-1347 SFD O 0
15805077 686 EHRHORN AV 2019-3983 ADU R 0
19302025 755 VICTOR WY 753 Victor Wy 2022-0188 SFD O 0
19302025 757 VICTOR WY 753 Victor Wy 2022-0189 SFD O 0
15320008 773 SAN LUCAS AV 2021-1575 ADU R 0
15303022 851 SIERRA
VISTA AV
851-853 Sierra Vista
Ave 2021-2844 SFA O 0
15303022 851 SIERRA
VISTA AV
851-853 Sierra Vista
Ave 2021-2845 SFA O 0
15303022 853 SIERRA
VISTA AV
851-853 Sierra Vista
Ave 2021-0268 SFA O 0
15317009 880 SAN SIMEON DR 2023-3368 ADU R 0
15013061 910 BURGOYNE ST 2023-0932 SFD O 0
15013061 912 BURGOYNE ST 2023-2149 ADU R 0
1 4
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units Project Identifier Unit Types Affordability by Household Incomes - Completed Entitlement Attachment 1
15015006 1000 SAN PIERRE W
1555 W Middlefield
Rd 2021-1487 SFA O 0
15015006 1002 SAN PIERRE W
1555 W Middlefield
Rd 2021-1383 SFA O 0
15015006 1008 SAN PIERRE W
1555 W Middlefield
Rd 2021-1380 SFA O 0
19303004 1009 LANE AV 2022-2208 ADU R 0
15015006 1010 SAN PIERRE W
1555 W Middlefield
Rd 2021-1485 SFA O 0
18930049 1040 MOUNTAIN VIEW AV 2023-0974 ADU R 0
19302025 1045 CASTRO ST 2022-0180 ADU R 0
19302025 1047 CASTRO ST 2022-0179 ADU R 0
15811014 1069 CALIFORNIA ST 2022-3196 ADU R 0
19711041 1153 BRYANT AV 2021-2067 ADU R 0
19711041 1155 BRYANT AV 2021-0452 SFD O 0
15016035 1169 BURGOYNE ST 2022-0553 SFD O 0
15016035 1171 BURGOYNE ST 2023-0306 ADU R 0
15015006 1201 VERANO RD
1555 W Middlefield
Rd 2021-1492 SFA O 0
15015006 1202 SAN RAMON A
1555 W Middlefield
Rd 2021-1433 SFA O 0
15015006 1203 VERANO RD
1555 W Middlefield
Rd 2021-1384 SFA O 0
15015006 1204 SAN RAMON A
1555 W Middlefield
Rd 2021-1434 SFA O 0
15015006 1205 VERANO RD
1555 W Middlefield
Rd 2021-1396 SFA O 0
15015006 1206 SAN RAMON A
1555 W Middlefield
Rd 2021-1436 SFA O 0
15015006 1207 VERANO RD
1555 W Middlefield
Rd 2021-1493 SFA O 0
15015006 1208 SAN RAMON A
1555 W Middlefield
Rd 2021-1507 SFA O 0
15015006 1209 VERANO RD
1555 W Middlefield
Rd 2021-1398 SFA O 0
15015006 1210 SAN RAMON A
1555 W Middlefield
Rd 2021-1502 SFA O 0
15015006 1211 VERANO RD
1555 W Middlefield
Rd 2021-1491 SFA O 0
15015006 1212 SAN RAMON A
1555 W Middlefield
Rd 2021-1437 SFA O 0
15015006 1214 SAN RAMON A
1555 W Middlefield
Rd 2021-1438 SFA O 0
15015006 1216 SAN RAMON A
1555 W Middlefield
Rd 2021-1439 SFA O 0
15015006 1218 SAN RAMON A
1555 W Middlefield
Rd 2021-1503 SFA O 0
15015006 1219 VERANO RD
1555 W Middlefield
Rd 2021-1401 SFA O 0
15015006 1221 VERANO RD
1555 W Middlefield
Rd 2021-1403 SFA O 0
15425066 1264 LATHAM ST 2019-3475 SFD O 0
15015006 1301 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1488 SFA O 0
15015006 1303 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1378 SFA O 0
18930049 1303 GILMORE ST 2022-3186 SFD O 0
15015006 1305 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1376 SFA O 0
15015006 1307 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1489 SFA O 0
15015006 1309 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1375 SFA O 0
15015006 1311 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1480 SFA O 0
15015006 1313 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1479 SFA O 0
15015006 1315 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1369 SFA O 0
15015006 1317 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1368 SFA O 0
15015006 1319 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1415 SFA O 0
Attachment 1
15015006 1321 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1356 SFA O 0
15015006 1323 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1414 SFA O 0
15015006 1325 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1355 SFA O 0
15015006 1327 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1481 SFA O 0
15015006 1329 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1482 SFA O 0
15015006 1335 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1413 SFA O 0
15015006 1389 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1238 SFA O 0
15015006 1393 W MIDDLEFIE
1555 W Middlefield
Rd 2021-1236 SFA O 0
19316048 1572 NILDA AV 2022-0954 ADU R 0
18905061 1639 FORDHAM WY 2020-0557 SFD O 0
18906077 1747 PEARTREE LN 2021-1202 ADU R 0
15011012 1777 VASSAR AV 2022-3491 SFD O 0
15011007 1843 VASSAR AV 2021-0225 SFD O 0
15013029 1857 SAN LUIS AV 2023-1505 ADU R 0
15013029 1857 SAN LUIS AV 2022-3337 SFD O 0
15014022 1859 SAN RAMON AV 2022-0133 SFD O 0
15303022 1962 COLONY ST 2021-0235 SFD O 0
15303022 1966 COLONY ST 2021-0252 SFD O 0
15303022 1968 COLONY ST 2021-0255 SFD O 0
17019049 2102 CREEDEN WY 1184 Solana Dr 2023-0279 ADU R 0 17019049 2104 CREEDEN WY 1184 Solana Dr 2023-0277 SFD O 0 17019049 2108 CREEDEN WY 1184 Solana Dr 2023-0280 ADU R 0 17019049 2110 CREEDEN WY 1184 Solana Dr 2023-0278 SFD O 0 19725020 2705 WASATCH DR 2021-0947 SFD O 0
19733029 13134 FRANKLIN AV 2021-2632 SFD O 0
19733029 13136 FRANKLIN AV 2022-1006 ADU R 0
19733018 13172 LORENE CT 2022-3127 ADU R 0
19733038 22407 DIERICX CT 2023-2881 ADU R 1 3/18/2024 1 15809027 572 SIERRA AV 2023-0558 ADU R 0
15434023 604 MARIPOSA AV 2022-3145 ADU R 0
19317028 685 DRUCILLA DR 2023-1559 ADU R 0
15824047 696 CHURCH ST 2024-1450 ADU R 1 6/20/2024 1
18909005 864 YARDIS CT 2022-0109 ADU R 0
19808002 901 E EL CAMINO R Crestview Hotel 2022-2434 5+ R 0 18905011 935 BARBARA AV 2018-4170 ADU R 0
19303021 1028 BORANDA AV 2022-3321 ADU R 0
18921035 1891 S SPRINGER RD 2022-0494 SFD O 0
18921035 1893 SPRINGER RD 2022-3230 ADU R 0
14723088 2456 BENJAMIN DR 2023-0487 ADU R 0
15026004 1265 MONTECITO AV 2023-1239 5+ R 0
14836033 500 GUTH AL
570 S Rengstorff
Ave 2024-1989 SFA O 0
14836033 502 GUTH AL
570 S Rengstorff
Ave 2024-2313 SFA O 0
14836033 504 GUTH AL
570 S Rengstorff
Ave 2024-2316 SFA O 0
14836033 506 GUTH AL
570 S Rengstorff
Ave 2024-2317 SFA O 0
14836033 508 GUTH AL
570 S Rengstorff
Ave 2024-2322 SFA O 0
14836033 510 GUTH AL
570 S Rengstorff
Ave 2024-2323 SFA O 0
14836033 512 GUTH AL
570 S Rengstorff
Ave 2024-2324 SFA O 0
14836033 514 GUTH AL
570 S Rengstorff
Ave 2024-2325 SFA O 0
14836033 515 GUTH AL
570 S Rengstorff
Ave 2024-2786 SFA O 0
14836033 516 SHOCKLEY AL
570 S Rengstorff
Ave 2024-2756 SFA O 0
14836033 517 GUTH AL
570 S Rengstorff
Ave 2024-2788 SFA O 0
14836033 518 SHOCKLEY AL
570 S Rengstorff
Ave 2024-2757 SFA O 0
Attachment 1
14836033 519 GUTH AL
570 S Rengstorff
Ave 2024-2791 SFA O 0
14836033 520 SHOCKLEY AL
570 S Rengstorff
Ave 2024-2758 SFA O 0
14836033 521 GUTH AL
570 S Rengstorff
Ave 2024-2797 SFA O 0
14836033 522 SHOCKLEY AL
570 S Rengstorff
Ave 2024-2759 SFA O 0
14836033 523 GUTH AL
570 S Rengstorff
Ave 2024-2798 SFA O 0
14836033 525 GUTH AL
570 S Rengstorff
Ave 2024-2807 SFA O 0
14836033 526 SHOCKLEY AL
570 S Rengstorff
Ave 2024-2782 SFA O 0
14836033 527 GUTH AL
570 S Rengstorff
Ave 2024-2808 SFA O 0
14836033 529 GUTH AL
570 S Rengstorff
Ave 2024-2810 SFA O 0
14836033 531 GUTH AL
570 S Rengstorff
Ave 2024-2813 SFA O 0
14836033 572 S RENGSTORF
570 S Rengstorff
Ave 2024-2821 SFA O 0
14836033 574 S RENGSTORF
570 S Rengstorff
Ave 2024-2833 SFA O 0
14836033 576 S RENGSTORF
570 S Rengstorff
Ave 2024-2834 SFA O 0
14836033 578 S RENGSTORF
570 S Rengstorff
Ave 2024-2835 SFA O 0
14836033 580 S RENGSTORF
570 S Rengstorff
Ave 2024-2836 SFA O 0
14836033 581 AMES AL
570 S Rengstorff
Ave 2024-2814 SFA O 0
14836033 582 S RENGSTORF
570 S Rengstorff
Ave 2024-2838 SFA O 0
14836033 584 S RENGSTORF
570 S Rengstorff
Ave 2024-2839 SFA O 0
14836033 586 S RENGSTORF
570 S Rengstorff
Ave 2024-1962 SFA O 0
14836033 588 S RENGSTORF
570 S Rengstorff
Ave 2024-1965 SFA O 0
14836033 590 S RENGSTORF
570 S Rengstorff
Ave 2024-1966 SFA O 0
14836033 592 S RENGSTORF
570 S Rengstorff
Ave 2024-1969 SFA O 0
14836033 594 S RENGSTORF
570 S Rengstorff
Ave 2024-1970 SFA O 0
14836033 596 S RENGSTORF
570 S Rengstorff
Ave 2024-1971 SFA O 0
14836033 598 S RENGSTORF
570 S Rengstorff
Ave 2024-1973 SFA O 0
15421017 1940 LATHAM ST 1958 Latham St 2023-3145 SFA O 0 15421017 1944 LATHAM ST 1958 Latham St 2023-3146 SFA O 0 15421017 1948 LATHAM ST 1958 Latham St 2023-3147 SFA O 0 15421017 1950 LATHAM ST 1958 Latham St 2023-3144 SFA O 0 15421017 1954 LATHAM ST 1958 Latham St 2023-3143 SFA O 0 15421017 1958 LATHAM ST 1958 Latham St 2020-0883 SFA O 0 16039023 115 BRENTON CT 268 Ada Ave 2020-0854 SFD O 0
16039015 214 ADA AV 268 Ada Ave 2024-0164 SFD O 0
16039024 218 ADA AV 268 Ada Ave 2020-0857 SFD O 0
19721056 465 APRICOT LN 3371 Beaumont Sq 2024-1404 ADU O 0 19721056 3373 BEAUMONT S 3371 Beaumont Sq 2024-1451 SFD O 0 19721056 3375 BEAUMONT S 3371 Beaumont Sq 2024-1481 ADU O 0 19721056 3377 BEAUMONT S 3371 Beaumont Sq 2024-1452 SFD O 0 19721056 3379 BEAUMONT S 3371 Beaumont Sq 2024-1482 ADU O 0 19721056 3381 BEAUMONT S 3371 Beaumont Sq 2024-1483 ADU O 0 19721056 3383 BEAUMONT S 3371 Beaumont Sq 2024-1453 SFD O 0 19721056 3371 BEAUMONT S 3371 Beaumont Sq 2024-1444 SFD O 0 15015023 995 SAN MARCOS CL 2024-2353 ADU R 1 8/30/2024 1 15015023 1411 SAN RAMON AV 2024-2354 SFD O 1 8/30/2024 1 15015023 1413 SAN RAMON AV 2024-2355 ADU R 1 8/30/2024 1 15015023 1421 SAN RAMON AV 2024-2352 SFD O 1 8/30/2024 1 19721013 3363 GRANT RD 2023-2599 SFD O 1 6/20/2024 1
19721013 3365 GRANT RD 2024-1065 ADU R 1 6/20/2024 1
Attachment 1
19721013 3373 GRANT RD 2023-2598 SFD O 1 6/20/2024 1
19721013 3375 GRANT RD 2024-1064 ADU R 1 6/20/2024 1
19736087 677 SLEEPER AV 2024-2067 SFD O 1 8/7/2024 1
19736052 679 SLEEPER AV 2024-2068 ADU R 1 8/7/2024 1
19736087 689 SLEEPER AV 2024-2069 SFD O 1 8/7/2024 1
15801010 89 CENTRE ST 2024-2643 SFD O 1 10/22/2024 1
15021022 136 MERIDIAN WY 2022-1907 SFD O 1 9/13/2024 1
15409022 202 MOUNTAIN VIEW AV 2022-1152 SFD O 1 4/25/2024 1 14807014 215 MONROE DR 2022-2866 SFD O 1 8/5/2024 1
15010021 246 FARLEY ST 2024-0103 SFD O 1 7/18/2024 1
19311021 295 HANS AV 2022-2556 SFD O 1 1/22/2024 1
16016015 360 WALKER DR 2023-2398 SFD O 1 1/12/2024 1
15431014 677 PETTIS AV 2023-3441 SFD O 1 7/16/2024 1
19319046 751 LOLA LN 2023-2742 SFD O 1 6/4/2024 1
18904062 1033 MARILYN DR 2024-1589 SFD O 1 12/18/2024 1 16016015 360 WALKER DR 2023-2398 ADU R 1 1/12/2024 1
19306001 1038 NILDA AV 2023-0117 SFD O 1 5/3/2024 1
17010006 1060 KAREN WY 2024-0624 SFD O 1 10/17/2024 1
18927014 1166 FORDHAM WY 2024-0120 SFD O 1 11/6/2024 1
18927016 1182 FORDHAM WY 2024-2061 SFD O 1 11/14/2024 1 18904103 1346 BROOKDALE AV 2023-1928 SFD O 1 2/5/2024 1 19309014 1523 MIRAMONTE AV 2022-1748 SFD O 1 6/27/2024 1 19316063 1599 BONITA AV 2023-3173 SFD O 1 8/8/2024 1
15011003 1893 VASSAR AV 2024-0462 SFD O 1 9/16/2024 1
17019070 2158 JARDIN DR 2022-3439 SFD O 1 5/30/2024 1
19318041 635 CORNELIA CT 2023-2290 ADU R 1 5/28/2024 1
15810041 1142 CHURCH ST 2023-1602 ADU R 1 1/29/2024 1
14734074 2426 WHITNEY DR 2024-0651 ADU R 1 4/17/2024 1
19724067 2722 FAIRBROOK DR 2023-3227 ADU R 1 7/2/2024 1 15828022 56 ELDORA DR 2024-2730 ADU R 1 10/9/2024 1
16010048 77 DEVONSHIRE AV 2024-1250 ADU R 1 5/28/2024 1 15021022 138 MERIDIAN WY 2023-2270 ADU R 1 9/13/2024 1
15409022 200 MOUNTAIN VIEW AV 2024-0547 ADU R 1 4/25/2024 1 14807014 217 MONROE DR 2024-1259 ADU R 1 8/5/2024 1
14807010 241 MONROE DR 2024-1554 ADU R 1 6/21/2024 1
15829056 492 CALDERON AV 2023-2150 ADU R 1 3/6/2024 1
16004003 620 ALAMO CT 42 2024-1927 ADU R 1 8/28/2024 1
16004003 620 ALAMO CT 40 2024-1928 ADU R 1 8/28/2024 1
19736080 629 SLEEPER AV 2023-2836 ADU R 1 11/21/2024 1
19318020 659 LOLA LN 2024-0650 ADU R 1 4/26/2024 1
19319046 749 LOLA LN 2024-1297 ADU R 1 6/4/2024 1
15326027 822 JACKSON ST 2023-2782 ADU R 1 6/18/2024 1
19724028 863 DOVERTON SQ 2022-1852 ADU R 1 10/25/2024 1 15016025 989 BURGOYNE ST 2024-1231 ADU R 1 9/25/2024 1
19306001 1038 NILDA AV 2024-0312 ADU R 1 5/3/2024 1
19306002 1046 NILDA AV 2024-2789 ADU R 1 10/29/2024 1
17010006 1058 KAREN WY 2024-2773 ADU R 1 10/17/2024 1
19305008 1092 PETIE WY 2024-2552 ADU R 1 11/26/2024 1
18927014 1168 FORDHAM WY 2024 2452 ADU R 1 11/6/2024 1
18904070 1326 ISABELLE AV 2024-2236 ADU R 1 10/22/2024 1 18904103 1346 BROOKDALE AV 2023-3392 ADU R 1 2/5/2024 1 19316063 1599 BONITA AV 2024-1821 ADU R 1 8/8/2024 1
15011003 1891 VASSAR AV 2024-2526 ADU R 1 9/16/2024 1
17019070 2160 JARDIN DR 2024-0999 ADU R 1 5/30/2024 1
14838082 2177 STANFORD AV 2024-3324 ADU R 1 12/9/2024 1 14733042 2477 TAMALPAIS ST 2024-1014 ADU R 1 9/19/2024 1 19735007 13396 PASTEL LN 2024-1963 ADU R 1 12/2/2024 1
15824014 546 CHURCH ST 2024-1389 ADU R 1 6/13/2024 1
15828069 64 PAUL AV 2024-0805 ADU R 1 8/19/2024 1
14807010 243 MONROE DR 2024-1553 ADU R 1 6/21/2024 1
16004003 620 ALAMO CT 1 2024-2560 ADU R 1 10/21/2024 1
16004003 620 ALAMO CT 5 2024-2563 ADU R 1 10/21/2024 1
16004003 620 ALAMO CT 6 2024-2564 ADU R 1 10/21/2024 1
16004003 620 ALAMO CT 7 2024-2565 ADU R 1 10/21/2024 1
16004003 620 ALAMO CT 8 2024-2566 ADU R 1 10/21/2024 1
16004003 620 ALAMO CT 9 2024-2567 ADU R 1 10/21/2024 1
15811013 1075 CALIFORNIA ST 2021-1271 ADU R 1 4/4/2024 1 18931145 1115 EL MONTE AV 2024-1891 ADU R 1 7/25/2024 1 14836014 2280 LATHAM ST 2022-3319 ADU R 1 8/6/2024 1
Attachment 1
16060013 675-685 E
Middlefield Rd
675-685 E
Middlefield Rd
PL-2022-259 / PL-
6535
5+ R 102 48 686 12/17/2024 836
14816009,
14816008
2645-2655 Fayette
Dr
2645-2655 Fayette
Dr PL-2023-169 5+ O 4 10 56 11/12/2024 70
148-15-020 334 San Antonio
Rd 334 San Antonio Rd PL-2024-002 / PL-
6028
5+ R 22 77 1 12/17/2024 100
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Attachment 1
Table A2
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 8 9
Current APN Street Address Project Name+
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
84 17 0 17 1 17 81 217
15431029 662 PALO ALTO AV 0
15806022 910 BUSH ST 0
15806022 912 BUSH ST 0
17009012 1174 CLARK AV 0
18925124 1644 YALE DR 0
19302008 697 STAMM AV 0
16104010 105 MARGO DR 0
16019131 125 FLYNN AV 186 E Middlefield Rd 0
16019131 127 FLYNN AV 186 E Middlefield Rd 0
16019131 135 FLYNN AV 186 E Middlefield Rd 0
16019131 137 FLYNN AV 186 E Middlefield Rd 0
16019131 139 FLYNN AV 186 E Middlefield Rd 0
16019131 145 FLYNN AV 186 E Middlefield Rd 0
16019131 147 FLYNN AV 186 E Middlefield Rd 0
16019131 149 FLYNN AV 186 E Middlefield Rd 0
15844039 190 HORIZON AV 0
15401006 208 ESCUELA AV 0
15401034 234 ESCUELA AV 234 ESCUELA AV 0
15401034 234 ESCUELA AV 234 ESCUELA AV 0
15401034 234 ESCUELA AV 234 ESCUELA AV 0
15401034 234 ESCUELA AV 234 ESCUELA AV 0
15401034 234 ESCUELA AV 234 ESCUELA AV 0
15401034 234 ESCUELA AV 234 ESCUELA AV 0
15401034 234 ESCUELA AV 234 ESCUELA AV 0
15401034 234 ESCUELA AV 234 ESCUELA AV 0
15401034 234 ESCUELA AV 234 ESCUELA AV 0
16028010 252 N WHISMAN RD 0
15328017 260 ELMWOOD ST 0
19741046 272 CARMELITA DR 0
19741046 274 CARMELITA DR 0
14838072 288 FAIR OAKS ST 1 4/2/2024 1
14716101 331 ALDEAN AV 0
19741024 353 CARMELITA DR 0
19741024 357 CARMELITA DR 0
16104010 525 ALICE AV 0
7 Project Identifier Affordability by Household Incomes - Building Permits Attachment 1
15806052 555 YOSEMITE AV 0
15805077 686 EHRHORN AV 0
15805077 686 EHRHORN AV 0
19302025 755 VICTOR WY 753 Victor Wy 0
19302025 757 VICTOR WY 753 Victor Wy 0
15320008 773 SAN LUCAS AV 0
15303022 851 SIERRA VISTA
AV
851-853 Sierra Vista
Ave 0
15303022 851 SIERRA VISTA
AV
851-853 Sierra Vista
Ave 0
15303022 853 SIERRA VISTA
AV
851-853 Sierra Vista
Ave 0
15317009 880 SAN SIMEON DR 0
15013061 910 BURGOYNE ST 0
15013061 912 BURGOYNE ST 0
15015006 1000 SAN PIERRE W
1555 W Middlefield
Rd 0
15015006 1002 SAN PIERRE W
1555 W Middlefield
Rd 0
15015006 1008 SAN PIERRE W
1555 W Middlefield
Rd 0
19303004 1009 LANE AV 0
15015006 1010 SAN PIERRE W
1555 W Middlefield
Rd 0
18930049 1040 MOUNTAIN VIEW AV 0
19302025 1045 CASTRO ST 0
19302025 1047 CASTRO ST 0
15811014 1069 CALIFORNIA ST 0
19711041 1153 BRYANT AV 0
19711041 1155 BRYANT AV 0
15016035 1169 BURGOYNE ST 0
15016035 1171 BURGOYNE ST 0
15015006 1201 VERANO RD
1555 W Middlefield
Rd 0
15015006 1202 SAN RAMON A
1555 W Middlefield
Rd 0
15015006 1203 VERANO RD
1555 W Middlefield
Rd 0
15015006 1204 SAN RAMON A
1555 W Middlefield
Rd 0
15015006 1205 VERANO RD
1555 W Middlefield
Rd 0
15015006 1206 SAN RAMON A
1555 W Middlefield
Rd 0
15015006 1207 VERANO RD
1555 W Middlefield
Rd 0
15015006 1208 SAN RAMON A
1555 W Middlefield
Rd 0
15015006 1209 VERANO RD
1555 W Middlefield
Rd 0
15015006 1210 SAN RAMON A
1555 W Middlefield
Rd 0
15015006 1211 VERANO RD
1555 W Middlefield
Rd 0
Attachment 1
15015006 1212 SAN RAMON A
1555 W Middlefield
Rd 0
15015006 1214 SAN RAMON A
1555 W Middlefield
Rd 0
15015006 1216 SAN RAMON A
1555 W Middlefield
Rd 0
15015006 1218 SAN RAMON A
1555 W Middlefield
Rd 0
15015006 1219 VERANO RD
1555 W Middlefield
Rd 0
15015006 1221 VERANO RD
1555 W Middlefield
Rd 0
15425066 1264 LATHAM ST 0
15015006 1301 W MIDDLEFIE
1555 W Middlefield
Rd 0
15015006 1303 W MIDDLEFIE
1555 W Middlefield
Rd 0
18930049 1303 GILMORE ST 0
15015006 1305 W MIDDLEFIE
1555 W Middlefield
Rd 0
15015006 1307 W MIDDLEFIE
1555 W Middlefield
Rd 0
15015006 1309 W MIDDLEFIE
1555 W Middlefield
Rd 0
15015006 1311 W MIDDLEFIE
1555 W Middlefield
Rd 0
15015006 1313 W MIDDLEFIE
1555 W Middlefield
Rd 0
15015006 1315 W MIDDLEFIE
1555 W Middlefield
Rd 0
15015006 1317 W MIDDLEFIE
1555 W Middlefield
Rd 0
15015006 1319 W MIDDLEFIE
1555 W Middlefield
Rd 0
15015006 1321 W MIDDLEFIE
1555 W Middlefield
Rd 0
15015006 1323 W MIDDLEFIE
1555 W Middlefield
Rd 0
15015006 1325 W MIDDLEFIE
1555 W Middlefield
Rd 0
15015006 1327 W MIDDLEFIE
1555 W Middlefield
Rd 0
15015006 1329 W MIDDLEFIE
1555 W Middlefield
Rd 0
15015006 1335 W MIDDLEFIE
1555 W Middlefield
Rd 0
15015006 1389 W MIDDLEFIE
1555 W Middlefield
Rd 0
15015006 1393 W MIDDLEFIE
1555 W Middlefield
Rd 0
19316048 1572 NILDA AV 0
18905061 1639 FORDHAM WY 0
18906077 1747 PEARTREE LN 0
15011012 1777 VASSAR AV 0
Attachment 1
15011007 1843 VASSAR AV 0
15013029 1857 SAN LUIS AV 0
15013029 1857 SAN LUIS AV 0
15014022 1859 SAN RAMON AV 0
15303022 1962 COLONY ST 0
15303022 1966 COLONY ST 0
15303022 1968 COLONY ST 0
17019049 2102 CREEDEN WY 1184 Solana Dr 0
17019049 2104 CREEDEN WY 1184 Solana Dr 0
17019049 2108 CREEDEN WY 1184 Solana Dr 0
17019049 2110 CREEDEN WY 1184 Solana Dr 0
19725020 2705 WASATCH DR 0
19733029 13134 FRANKLIN AV 0
19733029 13136 FRANKLIN AV 0
19733018 13172 LORENE CT 0
19733038 22407 DIERICX CT 1 3/18/2024 1
15809027 572 SIERRA AV 0
15434023 604 MARIPOSA AV 0
19317028 685 DRUCILLA DR 0
15824047 696 CHURCH ST 1 6/20/2024 1
18909005 864 YARDIS CT 0
19808002 901 E EL CAMINO R Crestview Hotel 0
18905011 935 BARBARA AV 0
19303021 1028 BORANDA AV 0
18921035 1891 S SPRINGER RD 0
18921035 1893 SPRINGER RD 0
14723088 2456 BENJAMIN DR 0
15026004 1265 MONTECITO AV 84 1 2/15/2024 85
14836033 500 GUTH AL 570 S Rengstorff Ave 1 9/4/2024 1
14836033 502 GUTH AL 570 S Rengstorff Ave 1 9/4/2024 1
14836033 504 GUTH AL 570 S Rengstorff Ave 1 9/4/2024 1
14836033 506 GUTH AL 570 S Rengstorff Ave 1 9/4/2024 1
14836033 508 GUTH AL 570 S Rengstorff Ave 1 9/4/2024 1
14836033 510 GUTH AL 570 S Rengstorff Ave 1 9/4/2024 1
14836033 512 GUTH AL 570 S Rengstorff Ave 1 9/4/2024 1
14836033 514 GUTH AL 570 S Rengstorff Ave 1 9/4/2024 1
14836033 515 GUTH AL 570 S Rengstorff Ave 1 10/30/2024 1 14836033 516 SHOCKLEY AL 570 S Rengstorff Ave 1 10/30/2024 1 14836033 517 GUTH AL 570 S Rengstorff Ave 1 10/30/2024 1 14836033 518 SHOCKLEY AL 570 S Rengstorff Ave 1 10/30/2024 1 Attachment 1
14836033 519 GUTH AL 570 S Rengstorff Ave 1 10/30/2024 1 14836033 520 SHOCKLEY AL 570 S Rengstorff Ave 1 10/30/2024 1 14836033 521 GUTH AL 570 S Rengstorff Ave 1 10/30/2024 1 14836033 522 SHOCKLEY AL 570 S Rengstorff Ave 1 10/30/2024 1 14836033 523 GUTH AL 570 S Rengstorff Ave 1 10/30/2024 1 14836033 525 GUTH AL 570 S Rengstorff Ave 1 10/30/2024 1 14836033 526 SHOCKLEY AL 570 S Rengstorff Ave 1 9/4/2024 1 14836033 527 GUTH AL 570 S Rengstorff Ave 1 10/30/2024 1 14836033 529 GUTH AL 570 S Rengstorff Ave 1 10/30/2024 1 14836033 531 GUTH AL 570 S Rengstorff Ave 1 10/30/2024 1 14836033 572 S RENGSTORF 570 S Rengstorff Ave 1 10/30/2024 1 14836033 574 S RENGSTORF 570 S Rengstorff Ave 1 10/30/2024 1 14836033 576 S RENGSTORF 570 S Rengstorff Ave 1 10/30/2024 1 14836033 578 S RENGSTORF 570 S Rengstorff Ave 1 10/30/2024 1 14836033 580 S RENGSTORF 570 S Rengstorff Ave 1 10/30/2024 1 14836033 581 AMES AL 570 S Rengstorff Ave 1 10/30/2024 1 14836033 582 S RENGSTORF 570 S Rengstorff Ave 1 10/30/2024 1 14836033 584 S RENGSTORF 570 S Rengstorff Ave 1 10/30/2024 1 14836033 586 S RENGSTORF 570 S Rengstorff Ave 1 9/4/2024 1 14836033 588 S RENGSTORF 570 S Rengstorff Ave 1 9/4/2024 1 14836033 590 S RENGSTORF 570 S Rengstorff Ave 1 9/4/2024 1 14836033 592 S RENGSTORF 570 S Rengstorff Ave 1 9/4/2024 1 14836033 594 S RENGSTORF 570 S Rengstorff Ave 1 9/4/2024 1 14836033 596 S RENGSTORF 570 S Rengstorff Ave 1 9/4/2024 1 14836033 598 S RENGSTORF 570 S Rengstorff Ave 1 9/4/2024 1 15421017 1940 LATHAM ST 1958 Latham St 1 5/22/2024 1
15421017 1944 LATHAM ST 1958 Latham St 1 5/22/2024 1
15421017 1948 LATHAM ST 1958 Latham St 1 5/22/2024 1
15421017 1950 LATHAM ST 1958 Latham St 1 5/22/2024 1
Attachment 1
15421017 1954 LATHAM ST 1958 Latham St 1 5/22/2024 1
15421017 1958 LATHAM ST 1958 Latham St 1 5/22/2024 1
16039023 115 BRENTON CT 268 Ada Ave 1 3/8/2024 1
16039015 214 ADA AV 268 Ada Ave 1 3/8/2024 1
16039024 218 ADA AV 268 Ada Ave 1 3/8/2024 1
19721056 465 APRICOT LN 3371 Beaumont Sq 1 7/11/2024 1
19721056 3373 BEAUMONT S 3371 Beaumont Sq 1 7/11/2024 1 19721056 3375 BEAUMONT S 3371 Beaumont Sq 1 7/11/2024 1 19721056 3377 BEAUMONT S 3371 Beaumont Sq 1 7/11/2024 1 19721056 3379 BEAUMONT S 3371 Beaumont Sq 1 7/11/2024 1 19721056 3381 BEAUMONT S 3371 Beaumont Sq 1 7/11/2024 1 19721056 3383 BEAUMONT S 3371 Beaumont Sq 1 7/11/2024 1 19721056 3371 BEAUMONT S 3371 Beaumont Sq 1 7/11/2024 1 15015023 995 SAN MARCOS CL 1 8/30/2024 1
15015023 1411 SAN RAMON AV 1 8/30/2024 1
15015023 1413 SAN RAMON AV 1 8/30/2024 1
15015023 1421 SAN RAMON AV 1 8/30/2024 1
19721013 3363 GRANT RD 1 6/20/2024 1
19721013 3365 GRANT RD 1 6/20/2024 1
19721013 3373 GRANT RD 1 6/20/2024 1
19721013 3375 GRANT RD 1 6/20/2024 1
19736087 677 SLEEPER AV 1 8/7/2024 1
19736052 679 SLEEPER AV 1 8/7/2024 1
19736087 689 SLEEPER AV 1 8/7/2024 1
15801010 89 CENTRE ST 1 10/22/2024 1
15021022 136 MERIDIAN WY 1 9/13/2024 1
15409022 202 MOUNTAIN VIEW AV 1 4/25/2024 1
14807014 215 MONROE DR 1 8/5/2024 1
15010021 246 FARLEY ST 1 7/18/2024 1
19311021 295 HANS AV 1 1/22/2024 1
16016015 360 WALKER DR 1 1/12/2024 1
15431014 677 PETTIS AV 1 7/16/2024 1
19319046 751 LOLA LN 1 6/4/2024 1
18904062 1033 MARILYN DR 1 12/18/2024 1
16016015 360 WALKER DR 1 1/12/2024 1
19306001 1038 NILDA AV 1 5/3/2024 1
17010006 1060 KAREN WY 1 10/17/2024 1
18927014 1166 FORDHAM WY 1 11/6/2024 1
18927016 1182 FORDHAM WY 1 11/14/2024 1
18904103 1346 BROOKDALE AV 1 2/5/2024 1
19309014 1523 MIRAMONTE AV 1 6/27/2024 1
19316063 1599 BONITA AV 1 8/8/2024 1
15011003 1893 VASSAR AV 1 9/16/2024 1
17019070 2158 JARDIN DR 1 5/30/2024 1
19318041 635 CORNELIA CT 1 5/28/2024 1
15810041 1142 CHURCH ST 1 1/29/2024 1
14734074 2426 WHITNEY DR 1 4/17/2024 1
19724067 2722 FAIRBROOK DR 1 7/2/2024 1
15828022 56 ELDORA DR 1 10/9/2024 1
16010048 77 DEVONSHIRE AV 1 5/28/2024 1
15021022 138 MERIDIAN WY 1 9/13/2024 1
15409022 200 MOUNTAIN VIEW AV 1 4/25/2024 1
Attachment 1
14807014 217 MONROE DR 1 8/5/2024 1
14807010 241 MONROE DR 1 6/21/2024 1
15829056 492 CALDERON AV 1 3/6/2024 1
16004003 620 ALAMO CT 42 1 8/28/2024 1
16004003 620 ALAMO CT 40 1 8/28/2024 1
19736080 629 SLEEPER AV 1 11/21/2024 1
19318020 659 LOLA LN 1 4/26/2024 1
19319046 749 LOLA LN 1 6/4/2024 1
15326027 822 JACKSON ST 1 6/18/2024 1
19724028 863 DOVERTON SQ 1 10/25/2024 1
15016025 989 BURGOYNE ST 1 9/25/2024 1
19306001 1038 NILDA AV 1 5/3/2024 1
19306002 1046 NILDA AV 1 10/29/2024 1
17010006 1058 KAREN WY 1 10/17/2024 1
19305008 1092 PETIE WY 1 11/26/2024 1
18927014 1168 FORDHAM WY 1 11/6/2024 1
18904070 1326 ISABELLE AV 1 10/22/2024 1
18904103 1346 BROOKDALE AV 1 2/5/2024 1
19316063 1599 BONITA AV 1 8/8/2024 1
15011003 1891 VASSAR AV 1 9/16/2024 1
17019070 2160 JARDIN DR 1 5/30/2024 1
14838082 2177 STANFORD AV 1 12/9/2024 1
14733042 2477 TAMALPAIS ST 1 9/19/2024 1
19735007 13396 PASTEL LN 1 12/2/2024 1
15824014 546 CHURCH ST 1 6/13/2024 1
15828069 64 PAUL AV 1 8/19/2024 1
14807010 243 MONROE DR 1 6/21/2024 1
16004003 620 ALAMO CT 1 1 10/21/2024 1
16004003 620 ALAMO CT 5 1 10/21/2024 1
16004003 620 ALAMO CT 6 1 10/21/2024 1
16004003 620 ALAMO CT 7 1 10/21/2024 1
16004003 620 ALAMO CT 8 1 10/21/2024 1
16004003 620 ALAMO CT 9 1 10/21/2024 1
15811013 1075 CALIFORNIA ST 1 4/4/2024 1
18931145 1115 EL MONTE AV 1 7/25/2024 1
14836014 2280 LATHAM ST 1 8/6/2024 1
16060013 675-685 E
Middlefield Rd
675-685 E Middlefield
Rd 0
14816009,
14816008
2645-2655 Fayette
Dr 2645-2655 Fayette Dr 0
148-15-020 334 San Antonio
Rd 334 San Antonio Rd 0
0 0
0 0
0 0
0 0
0 0
Attachment 1
Table A2
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 11 12
Current APN Street Address P roject Name+
Very Low-
Income Deed
R
estricted
Very Low-
Income Non
D
eed
Restricted
Low- Income
Deed
R
estricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
D
eed Restricted
Above
Moderate-
I
ncome
Certificates of
Occupancy or other
forms of readiness
(see instructions)
Date Issued
# of Units
issued
C
ertificates of
Occupancy or
other forms of
readiness
48 15 0 15 1 14 83 176
15431029 662 PALO ALTO AV 1 5/7/2024 1
15806022 910 BUSH ST 1 1/25/2024 1
15806022 912 BUSH ST 1 1/25/2024 1
17009012 1174 CLARK AV 1 4/30/2024 1
18925124 1644 YALE DR 1 6/3/2024 1
19302008 697 STAMM AV 1 8/6/2024 1
16104010 105 MARGO DR 1 12/9/2024 1
16019131 125 FLYNN AV 186 E Middlefield Rd 1 11/22/2024 1 16019131 127 FLYNN AV 186 E Middlefield Rd 1 11/22/2024 1 16019131 135 FLYNN AV 186 E Middlefield Rd 1 11/22/2024 1 16019131 137 FLYNN AV 186 E Middlefield Rd 1 11/22/2024 1 16019131 139 FLYNN AV 186 E Middlefield Rd 1 11/22/2024 1 16019131 145 FLYNN AV 186 E Middlefield Rd 1 11/22/2024 1 16019131 147 FLYNN AV 186 E Middlefield Rd 1 11/22/2024 1 16019131 149 FLYNN AV 186 E Middlefield Rd 1 11/22/2024 1 15844039 190 HORIZON AV 1 6/25/2024 1
15401006 208 ESCUELA AV 1 3/6/2024 1
15401034 234 ESCUELA AV 234 ESCUELA AV 1 9/24/2024 1
15401034 234 ESCUELA AV 234 ESCUELA AV 1 9/24/2024 1
15401034 234 ESCUELA AV 234 ESCUELA AV 1 9/5/2024 1
15401034 234 ESCUELA AV 234 ESCUELA AV 1 9/6/2024 1
15401034 234 ESCUELA AV 234 ESCUELA AV 1 9/5/2024 1
15401034 234 ESCUELA AV 234 ESCUELA AV 1 9/5/2024 1
15401034 234 ESCUELA AV 234 ESCUELA AV 1 9/5/2024 1
15401034 234 ESCUELA AV 234 ESCUELA AV 1 9/24/2024 1
15401034 234 ESCUELA AV 234 ESCUELA AV 1 9/5/2024 1
16028010 252 N WHISMAN RD 1 10/18/2024 1
15328017 260 ELMWOOD ST 1 11/14/2024 1
19741046 272 CARMELITA DR 1 3/8/2024 1
19741046 274 CARMELITA DR 1 3/8/2024 1
14838072 288 FAIR OAKS ST 1 8/21/2024 1
14716101 331 ALDEAN AV 1 1/19/2024 1
19741024 353 CARMELITA DR 1 12/11/2024 1
19741024 357 CARMELITA DR 1 12/11/2024 1
16104010 525 ALICE AV 1 10/29/2024 1
Affordability by Household Incomes - Certificates of Occupancy 10 Project Identifier
Attachment 1
15806052 555 YOSEMITE AV 1 8/15/2024 1
15805077 686 EHRHORN AV 1 3/6/2024 1
15805077 686 EHRHORN AV 1 3/6/2024 1
19302025 755 VICTOR WY 753 Victor Wy 1 2/1/2024 1
19302025 757 VICTOR WY 753 Victor Wy 1 2/1/2024 1
15320008 773 SAN LUCAS AV 1 12/4/2024 1
15303022 851 SIERRA VISTA
AV
851-853 Sierra Vista
Ave 1 6/17/2024 1
15303022 851 SIERRA VISTA
AV
851-853 Sierra Vista
Ave 1 4/26/2024 1
15303022 853 SIERRA VISTA
AV
851-853 Sierra Vista
Ave 1 11/7/2024 1
15317009 880 SAN SIMEON DR 1 11/14/2024 1
15013061 910 BURGOYNE ST 1 12/5/2024 1
15013061 912 BURGOYNE ST 1 12/5/2024 1
15015006 1000 SAN PIERRE W
1555 W Middlefield
Rd 1 9/23/2024 1
15015006 1002 SAN PIERRE W
1555 W Middlefield
Rd 1 9/23/2024 1
15015006 1008 SAN PIERRE W
1555 W Middlefield
Rd 1 9/20/2024 1
19303004 1009 LANE AV 1 12/19/2024 1
15015006 1010 SAN PIERRE W
1555 W Middlefield
Rd 1 10/7/2024 1
18930049 1040 MOUNTAIN VIEW AV 1 9/13/2024 1
19302025 1045 CASTRO ST 1 2/1/2024 1
19302025 1047 CASTRO ST 1 2/1/2024 1
15811014 1069 CALIFORNIA ST 1 5/1/2024 1
19711041 1153 BRYANT AV 1 2/22/2024 1
19711041 1155 BRYANT AV 1 2/22/2024 1
15016035 1169 BURGOYNE ST 1 10/30/2024 1
15016035 1171 BURGOYNE ST 1 10/30/2024 1
15015006 1201 VERANO RD
1555 W Middlefield
Rd 1 3/19/2024 1
15015006 1202 SAN RAMON A
1555 W Middlefield
Rd 1 3/19/2024 1
15015006 1203 VERANO RD
1555 W Middlefield
Rd 1 2/21/2024 1
15015006 1204 SAN RAMON A
1555 W Middlefield
Rd 1 4/4/2024 1
15015006 1205 VERANO RD
1555 W Middlefield
Rd 1 2/20/2024 1
15015006 1206 SAN RAMON A
1555 W Middlefield
Rd 1 3/18/2024 1
15015006 1207 VERANO RD
1555 W Middlefield
Rd 1 3/19/2024 1
15015006 1208 SAN RAMON A
1555 W Middlefield
Rd 1 3/18/2024 1
15015006 1209 VERANO RD
1555 W Middlefield
Rd 1 1/17/2024 1
15015006 1210 SAN RAMON A
1555 W Middlefield
Rd 1 2/23/2024 1
15015006 1211 VERANO RD
1555 W Middlefield
Rd 1 1/17/2024 1
Exhibit 1
15015006 1212 SAN RAMON A
1555 W Middlefield
Rd 1 2/16/2024 1
15015006 1214 SAN RAMON A
1555 W Middlefield
Rd 1 1/29/2024 1
15015006 1216 SAN RAMON A
1555 W Middlefield
Rd 1 1/29/2024 1
15015006 1218 SAN RAMON A
1555 W Middlefield
Rd 1 2/8/2024 1
15015006 1219 VERANO RD
1555 W Middlefield
Rd 1 1/30/2024 1
15015006 1221 VERANO RD
1555 W Middlefield
Rd 1 1/30/2024 1
15425066 1264 LATHAM ST 1 11/20/2024 1
15015006 1301 W MIDDLEFIE
1555 W Middlefield
Rd 1 8/8/2024 1
15015006 1303 W MIDDLEFIE
1555 W Middlefield
Rd 1 8/13/2024 1
18930049 1303 GILMORE ST 1 9/13/2024 1
15015006 1305 W MIDDLEFIE
1555 W Middlefield
Rd 1 8/9/2024 1
15015006 1307 W MIDDLEFIE
1555 W Middlefield
Rd 1 8/8/2024 1
15015006 1309 W MIDDLEFIE
1555 W Middlefield
Rd 1 8/8/2024 1
15015006 1311 W MIDDLEFIE
1555 W Middlefield
Rd 1 11/12/2024 1
15015006 1313 W MIDDLEFIE
1555 W Middlefield
Rd 1 6/24/2024 1
15015006 1315 W MIDDLEFIE
1555 W Middlefield
Rd 1 6/21/2024 1
15015006 1317 W MIDDLEFIE
1555 W Middlefield
Rd 1 6/21/2024 1
15015006 1319 W MIDDLEFIE
1555 W Middlefield
Rd 1 6/20/2024 1
15015006 1321 W MIDDLEFIE
1555 W Middlefield
Rd 1 6/20/2024 1
15015006 1323 W MIDDLEFIE
1555 W Middlefield
Rd 1 6/20/2024 1
15015006 1325 W MIDDLEFIE
1555 W Middlefield
Rd 1 6/20/2024 1
15015006 1327 W MIDDLEFIE
1555 W Middlefield
Rd 1 6/21/2024 1
15015006 1329 W MIDDLEFIE
1555 W Middlefield
Rd 1 3/26/2024 1
15015006 1335 W MIDDLEFIE
1555 W Middlefield
Rd 1 3/26/2024 1
15015006 1389 W MIDDLEFIE
1555 W Middlefield
Rd 1 10/7/2024 1
15015006 1393 W MIDDLEFIE
1555 W Middlefield
Rd 1 12/19/2024 1
19316048 1572 NILDA AV 1 4/26/2024 1
18905061 1639 FORDHAM WY 1 6/17/2024 1
18906077 1747 PEARTREE LN 1 11/22/2024 1
15011012 1777 VASSAR AV 1 11/15/2024 1
Exhibit 1
15011007 1843 VASSAR AV 1 4/16/2024 1
15013029 1857 SAN LUIS AV 1 5/8/2024 1
15013029 1857 SAN LUIS AV 1 5/8/2024 1
15014022 1859 SAN RAMON AV 1 6/7/2024 1
15303022 1962 COLONY ST 1 4/19/2024 1
15303022 1966 COLONY ST 1 5/7/2024 1
15303022 1968 COLONY ST 1 4/26/2024 1
17019049 2102 CREEDEN WY 1184 Solana Dr 1 8/21/2024 1
17019049 2104 CREEDEN WY 1184 Solana Dr 1 8/19/2024 1
17019049 2108 CREEDEN WY 1184 Solana Dr 1 1/24/2024 1
17019049 2110 CREEDEN WY 1184 Solana Dr 1 5/13/2024 1
19725020 2705 WASATCH DR 1 1/26/2024 1
19733029 13134 FRANKLIN AV 1 1/25/2024 1
19733029 13136 FRANKLIN AV 1 1/25/2024 1
19733018 13172 LORENE CT 1 3/22/2024 1
19733038 22407 DIERICX CT 1 8/29/2024 1
15809027 572 SIERRA AV 1 6/19/2024 1
15434023 604 MARIPOSA AV 1 5/1/2024 1
19317028 685 DRUCILLA DR 1 6/14/2024 1
15824047 696 CHURCH ST 1 11/25/2024 1
18909005 864 YARDIS CT 1 9/30/2024 1
19808002 901 E EL CAMINO R Crestview Hotel 48 1 11/20/2024 49 18905011 935 BARBARA AV 1 1/24/2024 1
19303021 1028 BORANDA AV 1 9/6/2024 1
18921035 1891 S SPRINGER RD 1 12/11/2024 1
18921035 1893 SPRINGER RD 1 12/11/2024 1
14723088 2456 BENJAMIN DR 1 4/4/2024 1
15026004 1265 MONTECITO AV 0
14836033 500 GUTH AL 570 S Rengstorff Ave 0
14836033 502 GUTH AL 570 S Rengstorff Ave 0
14836033 504 GUTH AL 570 S Rengstorff Ave 0
14836033 506 GUTH AL 570 S Rengstorff Ave 0
14836033 508 GUTH AL 570 S Rengstorff Ave 0
14836033 510 GUTH AL 570 S Rengstorff Ave 0
14836033 512 GUTH AL 570 S Rengstorff Ave 0
14836033 514 GUTH AL 570 S Rengstorff Ave 0
14836033 515 GUTH AL 570 S Rengstorff Ave 0
14836033 516 SHOCKLEY AL 570 S Rengstorff Ave 0
14836033 517 GUTH AL 570 S Rengstorff Ave 0
14836033 518 SHOCKLEY AL 570 S Rengstorff Ave 0
Exhibit 1
14836033 519 GUTH AL 570 S Rengstorff Ave 0
14836033 520 SHOCKLEY AL 570 S Rengstorff Ave 0
14836033 521 GUTH AL 570 S Rengstorff Ave 0
14836033 522 SHOCKLEY AL 570 S Rengstorff Ave 0
14836033 523 GUTH AL 570 S Rengstorff Ave 0
14836033 525 GUTH AL 570 S Rengstorff Ave 0
14836033 526 SHOCKLEY AL 570 S Rengstorff Ave 0
14836033 527 GUTH AL 570 S Rengstorff Ave 0
14836033 529 GUTH AL 570 S Rengstorff Ave 0
14836033 531 GUTH AL 570 S Rengstorff Ave 0
14836033 572 S RENGSTORF 570 S Rengstorff Ave 0
14836033 574 S RENGSTORF 570 S Rengstorff Ave 0
14836033 576 S RENGSTORF 570 S Rengstorff Ave 0
14836033 578 S RENGSTORF 570 S Rengstorff Ave 0
14836033 580 S RENGSTORF 570 S Rengstorff Ave 0
14836033 581 AMES AL 570 S Rengstorff Ave 0
14836033 582 S RENGSTORF 570 S Rengstorff Ave 0
14836033 584 S RENGSTORF 570 S Rengstorff Ave 0
14836033 586 S RENGSTORF 570 S Rengstorff Ave 0
14836033 588 S RENGSTORF 570 S Rengstorff Ave 0
14836033 590 S RENGSTORF 570 S Rengstorff Ave 0
14836033 592 S RENGSTORF 570 S Rengstorff Ave 0
14836033 594 S RENGSTORF 570 S Rengstorff Ave 0
14836033 596 S RENGSTORF 570 S Rengstorff Ave 0
14836033 598 S RENGSTORF 570 S Rengstorff Ave 0
15421017 1940 LATHAM ST 1958 Latham St 0
15421017 1944 LATHAM ST 1958 Latham St 0
15421017 1948 LATHAM ST 1958 Latham St 0
15421017 1950 LATHAM ST 1958 Latham St 0
Exhibit 1
15421017 1954 LATHAM ST 1958 Latham St 0
15421017 1958 LATHAM ST 1958 Latham St 0
16039023 115 BRENTON CT 268 Ada Ave 0
16039015 214 ADA AV 268 Ada Ave 0
16039024 218 ADA AV 268 Ada Ave 0
19721056 465 APRICOT LN 3371 Beaumont Sq 0
19721056 3373 BEAUMONT S 3371 Beaumont Sq 0
19721056 3375 BEAUMONT S 3371 Beaumont Sq 0
19721056 3377 BEAUMONT S 3371 Beaumont Sq 0
19721056 3379 BEAUMONT S 3371 Beaumont Sq 0
19721056 3381 BEAUMONT S 3371 Beaumont Sq 0
19721056 3383 BEAUMONT S 3371 Beaumont Sq 0
19721056 3371 BEAUMONT S 3371 Beaumont Sq 0
15015023 995 SAN MARCOS CL 0
15015023 1411 SAN RAMON AV 0
15015023 1413 SAN RAMON AV 0
15015023 1421 SAN RAMON AV 0
19721013 3363 GRANT RD 0
19721013 3365 GRANT RD 0
19721013 3373 GRANT RD 0
19721013 3375 GRANT RD 0
19736087 677 SLEEPER AV 0
19736052 679 SLEEPER AV 0
19736087 689 SLEEPER AV 0
15801010 89 CENTRE ST 0
15021022 136 MERIDIAN WY 0
15409022 202 MOUNTAIN VIEW AV 0
14807014 215 MONROE DR 0
15010021 246 FARLEY ST 0
19311021 295 HANS AV 0
16016015 360 WALKER DR 0
15431014 677 PETTIS AV 0
19319046 751 LOLA LN 0
18904062 1033 MARILYN DR 0
16016015 360 WALKER DR 0
19306001 1038 NILDA AV 0
17010006 1060 KAREN WY 0
18927014 1166 FORDHAM WY 0
18927016 1182 FORDHAM WY 0
18904103 1346 BROOKDALE AV 0
19309014 1523 MIRAMONTE AV 0
19316063 1599 BONITA AV 0
15011003 1893 VASSAR AV 0
17019070 2158 JARDIN DR 0
19318041 635 CORNELIA CT 0
15810041 1142 CHURCH ST 0
14734074 2426 WHITNEY DR 0
19724067 2722 FAIRBROOK DR 0
15828022 56 ELDORA DR 0
16010048 77 DEVONSHIRE AV 0
15021022 138 MERIDIAN WY 0
15409022 200 MOUNTAIN VIEW AV 0
Exhibit 1
14807014 217 MONROE DR 0
14807010 241 MONROE DR 0
15829056 492 CALDERON AV 0
16004003 620 ALAMO CT 42 0
16004003 620 ALAMO CT 40 0
19736080 629 SLEEPER AV 0
19318020 659 LOLA LN 0
19319046 749 LOLA LN 0
15326027 822 JACKSON ST 0
19724028 863 DOVERTON SQ 0
15016025 989 BURGOYNE ST 0
19306001 1038 NILDA AV 0
19306002 1046 NILDA AV 0
17010006 1058 KAREN WY 0
19305008 1092 PETIE WY 0
18927014 1168 FORDHAM WY 0
18904070 1326 ISABELLE AV 0
18904103 1346 BROOKDALE AV 0
19316063 1599 BONITA AV 0
15011003 1891 VASSAR AV 0
17019070 2160 JARDIN DR 0
14838082 2177 STANFORD AV 0
14733042 2477 TAMALPAIS ST 0
19735007 13396 PASTEL LN 0
15824014 546 CHURCH ST 0
15828069 64 PAUL AV 0
14807010 243 MONROE DR 0
16004003 620 ALAMO CT 1 0
16004003 620 ALAMO CT 5 0
16004003 620 ALAMO CT 6 0
16004003 620 ALAMO CT 7 0
16004003 620 ALAMO CT 8 0
16004003 620 ALAMO CT 9 0
15811013 1075 CALIFORNIA ST 0
18931145 1115 EL MONTE AV 0
14836014 2280 LATHAM ST 0
16060013 675-685 E
Middlefield Rd
675-685 E
Middlefield Rd 0
14816009,
14816008
2645-2655 Fayette
Dr
2645-2655 Fayette
Dr 0
148-15-020 334 San Antonio
Rd 334 San Antonio Rd 0
0 0
0 0
0 0
0 0
0 0
Exhibit 1
Table A2
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
Term of Affordability
or Deed Restriction
13 14 15 16 17 18 19 20 21 22 23 24
Current APN Street Address Project Name+
How many of the
units were
Extremely Low
Income?
Please select the
state streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/De
stroyed Units
Owner or
Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
163 52
15431029 662 PALO ALTO AV NONE Y ABAG's affordability methodology 15806022 910 BUSH ST NONE Y ABAG's affordability methodology 15806022 912 BUSH ST NONE Y ABAG's affordability methodology 17009012 1174 CLARK AV NONE Y ABAG's affordability methodology 18925124 1644 YALE DR NONE Y ABAG's affordability methodology 19302008 697 STAMM AV NONE Y ABAG's affordability methodology 16104010 105 MARGO DR NONE Y
16019131 125 FLYNN AV 186 E Middlefield Rd NONE Y
16019131 127 FLYNN AV 186 E Middlefield Rd NONE Y
16019131 135 FLYNN AV 186 E Middlefield Rd NONE Y
16019131 137 FLYNN AV 186 E Middlefield Rd NONE Y
16019131 139 FLYNN AV 186 E Middlefield Rd NONE Y
16019131 145 FLYNN AV 186 E Middlefield Rd NONE Y
16019131 147 FLYNN AV 186 E Middlefield Rd NONE Y
16019131 149 FLYNN AV 186 E Middlefield Rd NONE Y
15844039 190 HORIZON AV NONE Y
15401006 208 ESCUELA AV NONE Y 1 Demolished O
15401034 234 ESCUELA AV 234 ESCUELA AV NONE Y Other Other 15401034 234 ESCUELA AV 234 ESCUELA AV NONE Y Other Other 15401034 234 ESCUELA AV 234 ESCUELA AV NONE Y Other Other 15401034 234 ESCUELA AV 234 ESCUELA AV NONE Y Other Other 15401034 234 ESCUELA AV 234 ESCUELA AV NONE Y Other Other 15401034 234 ESCUELA AV 234 ESCUELA AV NONE Y Other Other 15401034 234 ESCUELA AV 234 ESCUELA AV NONE Y Other Other 15401034 234 ESCUELA AV 234 ESCUELA AV NONE Y Other Other 15401034 234 ESCUELA AV 234 ESCUELA AV NONE Y Other Other 16028010 252 N WHISMAN RD NONE Y ABAG's affordability methodology 15328017 260 ELMWOOD ST NONE Y
19741046 272 CARMELITA DR NONE Y ABAG's affordability methodology 19741046 274 CARMELITA DR NONE Y 1 Demolished O
14838072 288 FAIR OAKS ST NONE Y ABAG's affordability methodology 14716101 331 ALDEAN AV NONE Y ABAG's affordability methodology 19741024 353 CARMELITA DR NONE Y
19741024 357 CARMELITA DR NONE Y ABAG's affordability methodology 16104010 525 ALICE AV NONE Y ABAG's affordability methodology 15806052 555 YOSEMITE AV NONE Y
15805077 686 EHRHORN AV NONE Y 1 Demolished O
15805077 686 EHRHORN AV NONE Y ABAG's affordability methodology 19302025 755 VICTOR WY 753 Victor Wy NONE Y
19302025 757 VICTOR WY 753 Victor Wy NONE Y
15320008 773 SAN LUCAS AV NONE Y ABAG's affordability methodology 15303022 851 SIERRA
VISTA AV
851-853 Sierra Vista
Ave NONE Y
15303022 851 SIERRA
VISTA AV
851-853 Sierra Vista
Ave NONE Y
15303022 853 SIERRA
VISTA AV
851-853 Sierra Vista
Ave NONE Y
15317009 880 SAN SIMEON DR NONE Y ABAG's affordability methodology 15013061 910 BURGOYNE ST NONE Y 1 Demolished O
15013061 912 BURGOYNE ST NONE Y ABAG's affordability methodology 15015006 1000 SAN PIERRE
1555 W Middlefield
Rd NONE Y
15015006 1002 SAN PIERRE
1555 W Middlefield
Rd NONE Y
15015006 1008 SAN PIERRE
1555 W Middlefield
Rd NONE Y
19303004 1009 LANE AV NONE Y ABAG's affordability methodology 15015006 1010 SAN PIERRE
1555 W Middlefield
Rd NONE Y
18930049 1040 MOUNTAIN VIEW AV NONE Y ABAG's affordability methodology 19302025 1045 CASTRO ST NONE Y ABAG's affordability methodology 19302025 1047 CASTRO ST NONE Y ABAG's affordability methodology 15811014 1069 CALIFORNIA ST NONE Y ABAG's affordability methodology 19711041 1153 BRYANT AV NONE Y
19711041 1155 BRYANT AV NONE Y
15016035 1169 BURGOYNE ST NONE Y
15016035 1171 BURGOYNE ST NONE Y ABAG's affordability methodology 15015006 1201 VERANO RD
1555 W Middlefield
Rd NONE Y
15015006 1202 SAN RAMON A
1555 W Middlefield
Rd NONE Y
15015006 1203 VERANO RD
1555 W Middlefield
Rd NONE Y
15015006 1204 SAN RAMON A
1555 W Middlefield
Rd NONE Y
15015006 1205 VERANO RD
1555 W Middlefield
Rd NONE Y
Housing with Financial Assistance
and/or Deed Restrictions Demolished/Destroyed Units Density BonusProject Identifier Exhibit 1
15015006 1206 SAN RAMON A
1555 W Middlefield
Rd NONE Y
15015006 1207 VERANO RD
1555 W Middlefield
Rd NONE Y
15015006 1208 SAN RAMON A
1555 W Middlefield
Rd NONE Y
15015006 1209 VERANO RD
1555 W Middlefield
Rd NONE Y
15015006 1210 SAN RAMON A
1555 W Middlefield
Rd NONE Y
15015006 1211 VERANO RD
1555 W Middlefield
Rd NONE Y
15015006 1212 SAN RAMON A
1555 W Middlefield
Rd NONE Y
15015006 1214 SAN RAMON A
1555 W Middlefield
Rd NONE Y
15015006 1216 SAN RAMON A
1555 W Middlefield
Rd NONE Y
15015006 1218 SAN RAMON A
1555 W Middlefield
Rd NONE Y
15015006 1219 VERANO RD
1555 W Middlefield
Rd NONE Y
15015006 1221 VERANO RD
1555 W Middlefield
Rd NONE Y
15425066 1264 LATHAM ST NONE Y
15015006 1301 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
15015006 1303 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
18930049 1303 GILMORE ST NONE Y
15015006 1305 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
15015006 1307 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
15015006 1309 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
15015006 1311 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
15015006 1313 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
15015006 1315 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
15015006 1317 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
15015006 1319 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
15015006 1321 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
15015006 1323 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
15015006 1325 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
15015006 1327 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
15015006 1329 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
15015006 1335 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
15015006 1389 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
15015006 1393 W MIDDLEFIE
1555 W Middlefield
Rd NONE Y
19316048 1572 NILDA AV NONE Y ABAG's affordability methodology 18905061 1639 FORDHAM WY NONE Y
18906077 1747 PEARTREE LN NONE Y ABAG's affordability methodology 15011012 1777 VASSAR AV NONE Y 1 Demolished O
15011007 1843 VASSAR AV NONE Y 1 Demolished O
15013029 1857 SAN LUIS AV NONE Y ABAG's affordability methodology 15013029 1857 SAN LUIS AV NONE Y 1 Demolished O
15014022 1859 SAN RAMON AV NONE Y 1 Demolished O
15303022 1962 COLONY ST NONE Y
15303022 1966 COLONY ST NONE Y
15303022 1968 COLONY ST NONE Y
17019049 2102 CREEDEN WY 1184 Solana Dr SB 9 (2021) -
Residential Lot Split Y ABAG's affordability methodology 1 Demolished O 17019049 2104 CREEDEN WY 1184 Solana Dr SB 9 (2021) -
Residential Lot Split Y
17019049 2108 CREEDEN WY 1184 Solana Dr SB 9 (2021) -
Residential Lot Split Y ABAG's affordability methodology 17019049 2110 CREEDEN WY 1184 Solana Dr SB 9 (2021) -
Residential Lot Split Y
19725020 2705 WASATCH DR NONE Y 1 Demolished O
19733029 13134 FRANKLIN AV NONE Y 1 Demolished O
19733029 13136 FRANKLIN AV NONE Y ABAG's affordability methodology 19733018 13172 LORENE CT NONE Y ABAG's affordability methodology 19733038 22407 DIERICX CT NONE Y ABAG's affordability methodology 15809027 572 SIERRA AV NONE Y ABAG's affordability methodology 15434023 604 MARIPOSA AV NONE Y ABAG's affordability methodology 19317028 685 DRUCILLA DR NONE Y ABAG's affordability methodology 15824047 696 CHURCH ST NONE Y ABAG's affordability methodology 18909005 864 YARDIS CT NONE Y ABAG's affordability methodology 19808002 901 E EL CAMINO R Crestview Hotel 48 NONE Y CDBG Other 1000 18905011 935 BARBARA AV NONE Y
19303021 1028 BORANDA AV NONE Y
18921035 1891 S SPRINGER RD NONE Y 1 Demolished R
18921035 1893 SPRINGER RD NONE Y
14723088 2456 BENJAMIN DR NONE Y
15026004 1265 MONTECITO AV 84 NONE Y Other DB 1000 1.2% 1 Development Standards
Modification No
Exhibit 1
14836033 500 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 502 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 504 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 506 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 508 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 510 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 512 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 514 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 515 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 516 SHOCKLEY AL 570 S Rengstorff Ave NONE Y
14836033 517 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 518 SHOCKLEY AL 570 S Rengstorff Ave NONE Y
14836033 519 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 520 SHOCKLEY AL 570 S Rengstorff Ave NONE Y
14836033 521 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 522 SHOCKLEY AL 570 S Rengstorff Ave NONE Y
14836033 523 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 525 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 526 SHOCKLEY AL 570 S Rengstorff Ave NONE Y
14836033 527 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 529 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 531 GUTH AL 570 S Rengstorff Ave NONE Y
14836033 572 S RENGSTORF 570 S Rengstorff Ave NONE Y
14836033 574 S RENGSTORF 570 S Rengstorff Ave NONE Y
14836033 576 S RENGSTORF 570 S Rengstorff Ave NONE Y
14836033 578 S RENGSTORF 570 S Rengstorff Ave NONE Y
14836033 580 S RENGSTORF 570 S Rengstorff Ave NONE Y
14836033 581 AMES AL 570 S Rengstorff Ave NONE Y
14836033 582 S RENGSTORF 570 S Rengstorff Ave NONE Y
14836033 584 S RENGSTORF 570 S Rengstorff Ave NONE Y
14836033 586 S RENGSTORF 570 S Rengstorff Ave NONE Y
14836033 588 S RENGSTORF 570 S Rengstorff Ave NONE Y
14836033 590 S RENGSTORF 570 S Rengstorff Ave NONE Y
14836033 592 S RENGSTORF 570 S Rengstorff Ave NONE Y
14836033 594 S RENGSTORF 570 S Rengstorff Ave NONE Y
14836033 596 S RENGSTORF 570 S Rengstorff Ave NONE Y
14836033 598 S RENGSTORF 570 S Rengstorff Ave NONE Y
15421017 1940 LATHAM ST 1958 Latham St NONE Y 1 Demolished O 15421017 1944 LATHAM ST 1958 Latham St NONE Y
15421017 1948 LATHAM ST 1958 Latham St NONE Y
15421017 1950 LATHAM ST 1958 Latham St NONE Y
15421017 1954 LATHAM ST 1958 Latham St NONE Y
15421017 1958 LATHAM ST 1958 Latham St NONE Y
16039023 115 BRENTON CT 268 Ada Ave NONE Y 1 Demolished O 16039015 214 ADA AV 268 Ada Ave NONE Y
16039024 218 ADA AV 268 Ada Ave NONE Y
19721056 465 APRICOT LN 3371 Beaumont Sq NONE Y 1 Demolished O 19721056 3373 BEAUMONT S 3371 Beaumont Sq NONE Y
19721056 3375 BEAUMONT S 3371 Beaumont Sq NONE Y
19721056 3377 BEAUMONT S 3371 Beaumont Sq NONE Y
19721056 3379 BEAUMONT S 3371 Beaumont Sq NONE Y
19721056 3381 BEAUMONT S 3371 Beaumont Sq NONE Y
19721056 3383 BEAUMONT S 3371 Beaumont Sq NONE Y
19721056 3371 BEAUMONT S 3371 Beaumont Sq NONE Y
15015023 995 SAN MARCOS CL
SB 9 (2021) -
Residential Lot Split Y 1 Demolished O
15015023 1411 SAN RAMON AV
SB 9 (2021) -
Residential Lot Split Y
15015023 1413 SAN RAMON AV
SB 9 (2021) -
Residential Lot Split Y
15015023 1421 SAN RAMON AV
SB 9 (2021) -
Residential Lot Split Y
Exhibit 1
19721013 3363 GRANT RD
SB 9 (2021) -
Residential Lot Split Y 1 Demolished O
19721013 3365 GRANT RD
SB 9 (2021) -
Residential Lot Split Y ABAG's affordability methodology 19721013 3373 GRANT RD
SB 9 (2021) -
Residential Lot Split Y
19721013 3375 GRANT RD
SB 9 (2021) -
Residential Lot Split Y ABAG's affordability methodology 19736087 677 SLEEPER AV
SB 9 (2021) -
Residential Lot Split Y
19736052 679 SLEEPER AV
SB 9 (2021) -
Residential Lot Split Y ABAG's affordability methodology 1 Demolished O 19736087 689 SLEEPER AV
SB 9 (2021) -
Residential Lot Split Y
15801010 89 CENTRE ST NONE Y 1 Demolished O
15021022 136 MERIDIAN WY NONE Y 1 Demolished O
15409022 202 MOUNTAIN VIEW AV NONE Y 9 Demolished R
14807014 215 MONROE DR
SB 9 (2021) -
Residential Lot Split Y
15010021 246 FARLEY ST NONE Y 1 Demolished O
19311021 295 HANS AV NONE Y 1 Demolished O
16016015 360 WALKER DR NONE Y 1 Demolished O
15431014 677 PETTIS AV NONE Y 2 Demolished O
19319046 751 LOLA LN NONE Y 1 Demolished O
18904062 1033 MARILYN DR NONE Y 1 Demolished O
16016015 360 WALKER DR NONE Y ABAG's affordability methodology 1 Demolished R 19306001 1038 NILDA AV NONE Y 1 Demolished O
17010006 1060 KAREN WY NONE Y 1 Demolished O
18927014 1166 FORDHAM WY NONE Y 1 Demolished O
18927016 1182 FORDHAM WY NONE Y 1 Demolished O
18904103 1346 BROOKDALE AV NONE Y 1 Demolished O
19309014 1523 MIRAMONTE AV NONE Y 1 Demolished O
19316063 1599 BONITA AV NONE Y 1 Demolished O
15011003 1893 VASSAR AV NONE Y 1 Demolished O
17019070 2158 JARDIN DR NONE Y 1 Demolished O
19318041 635 CORNELIA CT NONE Y ABAG's affordability methodology 15810041 1142 CHURCH ST NONE Y ABAG's affordability methodology 14734074 2426 WHITNEY DR NONE Y ABAG's affordability methodology 19724067 2722 FAIRBROOK DR NONE Y ABAG's affordability methodology 15828022 56 ELDORA DR NONE Y ABAG's affordability methodology 16010048 77 DEVONSHIRE AV NONE Y ABAG's affordability methodology 15021022 138 MERIDIAN WY NONE Y ABAG's affordability methodology 15409022 200 MOUNTAIN VIEW AV NONE Y ABAG's affordability methodology 14807014 217 MONROE DR NONE Y ABAG's affordability methodology 14807010 241 MONROE DR NONE Y ABAG's affordability methodology 15829056 492 CALDERON AV NONE Y ABAG's affordability methodology 16004003 620 ALAMO CT 42 NONE Y ABAG's affordability methodology 16004003 620 ALAMO CT 40 NONE Y ABAG's affordability methodology 19736080 629 SLEEPER AV NONE Y ABAG's affordability methodology 19318020 659 LOLA LN NONE Y ABAG's affordability methodology 19319046 749 LOLA LN NONE Y ABAG's affordability methodology 15326027 822 JACKSON ST NONE Y ABAG's affordability methodology 19724028 863 DOVERTON SQ NONE Y ABAG's affordability methodology 15016025 989 BURGOYNE ST NONE Y ABAG's affordability methodology 19306001 1038 NILDA AV NONE Y ABAG's affordability methodology 19306002 1046 NILDA AV NONE Y ABAG's affordability methodology 17010006 1058 KAREN WY NONE Y ABAG's affordability methodology 19305008 1092 PETIE WY NONE Y ABAG's affordability methodology 18927014 1168 FORDHAM WY NONE Y ABAG's affordability methodology 18904070 1326 ISABELLE AV NONE Y ABAG's affordability methodology 18904103 1346 BROOKDALE AV NONE Y ABAG's affordability methodology 19316063 1599 BONITA AV NONE Y ABAG's affordability methodology 15011003 1891 VASSAR AV 0 NONE Y ABAG's affordability methodology 17019070 2160 JARDIN DR 0 NONE Y ABAG's affordability methodology 14838082 2177 STANFORD AV 0 NONE Y ABAG's affordability methodology 14733042 2477 TAMALPAIS ST 0 NONE Y ABAG's affordability methodology 19735007 13396 PASTEL LN 0 NONE Y ABAG's affordability methodology 15824014 546 CHURCH ST 0 NONE Y ABAG's affordability methodology 15828069 64 PAUL AV 0 NONE Y ABAG's affordability methodology 14807010 243 MONROE DR 0 NONE Y ABAG's affordability methodology 16004003 620 ALAMO CT 1 0 NONE Y ABAG's affordability methodology 16004003 620 ALAMO CT 5 0 NONE Y ABAG's affordability methodology 16004003 620 ALAMO CT 6 0 NONE Y ABAG's affordability methodology 16004003 620 ALAMO CT 7 0 NONE Y ABAG's affordability methodology 16004003 620 ALAMO CT 8 0 NONE Y ABAG's affordability methodology 16004003 620 ALAMO CT 9 0 NONE Y ABAG's affordability methodology 15811013 1075 CALIFORNIA ST 0 NONE Y ABAG's affordability methodology 18931145 1115 EL MONTE AV 0 NONE Y ABAG's affordability methodology 14836014 2280 LATHAM ST 0 NONE Y ABAG's affordability methodology 16060013 675-685 E
Middlefield Rd
675-685 E
Middlefield Rd 31 NONE Y Other INC 1000
14816009,
14816008
2645-2655 Fayette
Dr
2645-2655 Fayette
Dr NONE Y Other INC 1000 6 Demolished R
148-15-020 334 San Antonio
Rd 334 San Antonio Rd NONE Y Other Other, DB Funding applications are ongoing 1000 0.0% 11 Development
Standards
Modification
No
Exhibit 1
Jurisdiction Mountain View ANNUAL ELEMENT PROGRESS REPORT Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
1 Projection Period 3 4
RHNA Allocation by
Income Level
Projection Period -
06/30/2022-
01/30/2023
2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Units to Date (all years)
Total Remaining
RHNA by Income
Level
Deed Restricted 10 123 84 - - - - - - - Non-Deed Restricted - 9 17 - - - - - - - Deed Restricted 46 23 - - - - - - - - Non-Deed Restricted - 26 17 - - - - - - - Deed Restricted 118 3 1 - - - - - - - Non-Deed Restricted - 26 17 - - - - - - - Above Moderate 4,880 774 104 81 - - - - - - - 959 3,921 11,135
948 314 217 - - - - - - - 1,479 9,656 5 6 7
Extremely low-Income
Need 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Units to Date
Total Units
Remaining
1,387 87 84 - - - - - - - 171 1,216 VLI Deed Restricted
VLI Non Deed Restricted
1,485
Please note: For the last year of the 5th cycle, Table B will only include units that were permitted during the portion of the year that was in the 5th cycle. For the first year of the 6th cycle, Table B will only include units that were permitted since the start of the planning period. Projection Period units are in a separate column.
Total RHNA
Total Units
Income Level
Very Low
Low
Extremely Low-Income Units*
Note: units serving extremely low-income households are included in the very low-income RHNA progress and must be reported as very low-income units in section 7 of Table A2. They must also be reported in the extremely low-income category (section 13) in Table A2 to be counted as progress toward meeting the extremely low-income housing need determined pursuant to Government Code 65583(a)(1). *Extremely low-income housing need determined pursuant to Government Code 65583(a)(1). Value in Section 5 is default value, assumed to be half of the very low-income RHNA. May be overwritten.
Progress toward extremely low-income housing need, as determined pursuant to Government Code 65583(a)(1).
Please Note: Table B does not currently contain data from Table F or Table F2 for prior years. You may login to the APR system to see Table B that contains this data.
Please note: The APR form can only display data for one planning period. To view progress for a different planning period, you may login to HCD's online APR system, or contact HCD staff at [email protected].
1,720
243
This table is auto-populated once you enter your jurisdiction name and current year data. Past year information comes from previous APRs.
165 Moderate
2,773
1,597
1,885
Please contact HCD if your data is different than the material supplied here 112
2 Table B
Regional Housing Needs Allocation Progress
Permitted Units Issued by Affordability
2,530
Exhibit 1
Jurisdiction Mountain View ANNUAL ELEMENT PROGRESS REPORT Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Date of Rezone Rezone Type
2 4 5 6 7 9 10 11
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Date of Rezone Very Low-
Income Low-Income Moderate-Income Above Moderate-
Income
Rezone Type P arcel Size
(Acres)
General Plan
Designation Zoning M inimum
Density Allowed
Maximum
Density Allowed
Realistic
Capacity Vacant/Nonvacant D escription of Existing
Uses
Note: "+" indicates an optional field
C
ells in grey contain auto-calculation formulas
Summary Row: Start Data Entry Below
83 Project Identifier RHNA Shortfall by Household Income Category Sites Description 1 Sites Identified or Rezoned to Accommodate Shortfall Housing Need and No Net-Loss Law Table C
Exhibit 1
Jurisdiction Mountain View
Reporting Year 2024 (Jan. 1 - Dec. 31)
1 2 3 4
Name of Program Objective Timeframe in H.E Status of Program Implementation
1.1.a-e - Zoning Ordinance
Update for Consistency with
State Laws
Update the Zoning Ordinance to be consistent with recent legislation, Government Code and Health and Safety Code regulations.
December 31,
2024.
Adopt zoning
updates annually
as necessary to
respond to future
changes in State
law (ongoing).
Completed. Zoning Ordinance updates addressing 1.1.a-1.1.e completed December 5, 2023.
Council adoption:
https://mountainview.legistar.com/LegislationDetail.aspx?ID=6438614&GUID=BC7A A7B8-4209-4C82-9D48-DD2666124B7D&Options=&Search=
On-going updates will occur annually to ensure compliance with State Law.
1.1.f - Zoning Ordinance
Update for Consistency with
State Laws
f) Amend the ordinance and/or applicable precise plan(s) to allow emergency shelters by right consistent with AB2339. At minimum, this will include the El Camino Real Precise Plan (consistent with the analysis provided in the sites inventory, Appendix E). In addition, identify at least one additional site consistent with the AB2339 methodology and the non-vacant sites analysis in Appendix E, and amend the subject Zoning District or Precise Plan as necessary.
Adopt zoning
updates for AB
2339 by March 31,
2024
Completed. Approved by City Council March 26, 2024:
Council adoption:
https://mountainview.legistar.com/LegislationDetail.aspx?ID=6587843&GUID=891ED 921-8738-4D54-8C26-40B273F3160F&Options=&Search=
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element.
Table D
Program Implementation Status pursuant to GC Section 65583 Exhibit 1
1.1.g - Zoning Ordinance
Update for Consistency with
State Laws
g) Ensure zoning and general plan for all sites is consistent with the Housing Element site inventory and pipeline projects. The following areas will be rezoned:
a. Leong Drive and Fairchild Drive properties at the west end of the Evandale Precise Plan (up to at least 43 DU/ac) – the rezoning will also identify which sites will have required neighborhood commercial b. 1702 Miramonte, 777 Cuesta Drive, and 1949 Grant Road (up to a least 30 DU/ac)
c. Moffett Boulevard (up to at least 1.85 FAR, approximately 72 DU/ac) – the rezoning will also identify which sites will have required neighborhood commercial
d. 677-699 Calderon Ave (up to at least 30 DU/ac) – with required neighborhood commercial
e. Mountain View Transit Center (up to at least 75 DU/ac) -- in addition, the City will continue to work with and facilitate Caltrain in the development of residential on this site, possibly with other uses Adopt zoning
updates needed
for any sites
included in the
sites inventory by
December
31,2025. If a
pipeline rezoning
project is not
approved by this
date, those units
will be removed
from the buffer. If
there is no buffer
remaining, then
additional sites
will be identified
through the “no
net loss” process.
Moffett Boulevard in progress: https://www.mountainview.gov/our- city/departments/community-development/planning/city-planning-and-policy- projects/moffett-boulevard-rezoning-project
Other areas in progress:
https://www.mountainview.gov/our-city/departments/community- development/planning/housing-element/housing-element-program-1-1-g
1.2 - Eliminate Minimum
Parking Standards for
Residential in Transit-
Oriented Areas, Affordable
Housing Developments, and
Other Cases
Codify exemptions to parking standards for:
a) 100% affordable housing developments.
Update zoning
ordinance and (if
necessary) zoning
or Precise Plan
amendments by
December 31,
2024.
Completed.
Program 1.2.a. completed December 5, 2023.
City Code Section 36.32.50:
https://library.municode.com/ca/mountain_view/codes/code_of_ordinances?nodeId= PTIITHCO_CH36ZO_ARTXPALO
1.2 - Eliminate Minimum
Parking Standards for
Residential in Transit-
Oriented Areas, Affordable
Housing Developments, and
Other Cases
Codify exemptions to parking standards for:
a) 100% affordable housing developments.
b) Residential developments throughout the El Camino Real, San Antonio, Downtown and East
Whisman Precise Plans, as well as the Moffett Boulevard General Plan Change Area
Update zoning
ordinance and (if
necessary) zoning
or Precise Plan
amendments by
December 31,
2024.
Completed.
Program 1.2.b completed November 12, 2024.
Council Adoption:
https://mountainview.legistar.com/LegislationDetail.aspx?ID=7015499&GUID=144BC 030-3188-46EB-BC24-4710F6D0EEBB&Options=&Search=
Exhibit 1
1.2 - Eliminate Minimum
Parking Standards for
Residential in Transit-
Oriented Areas, Affordable
Housing Developments, and
Other Cases
Codify exemptions to parking standards for:
c) Projects meeting enhanced transportation demand management criteria as determined by the City’s TDM ordinance"
Adopt the
enhanced
transportation
demand
management
criteria by
December 31,
2026.
In-progress.
Being developed in parallel with Program 1.3. Anticipated completion date Q4 2025.
1.3(e) - Review and Update
Ordinance and Precise Plan
Residential Standards
e) Study live-work as an allowed residential use near retail areas, major corridors and other viable locations
Update Zoning
Ordinance and
Precise Plans to
reflect reduced
standards and live-
work by
December 31,
2025.
Not started. Will be carried out with R3 Zoning District Update.
1.3(h) - Review and Update
Ordinance and Precise Plan
Residential Standards
h) Conduct a review of R2 zoned properties. For all properties, upzone to either allow density greater than typical R1 properties under SB9, (at least four units per typical parcel, plus ADUs) or integrate the sites into the R3 zone. Sites selected to integrate into the R3 zone should be based on affirmatively furthering
Update Zoning
Ordinance and
Precise Plans to
reflect reduced
standards and live-
work by
December 31,
2025.
In progress. Carried out with R3 Zoning Disrtict Update. Council direction tentatively expected in March.
R3 Website: https://mountainview.gov/r3zoningupdate
1.3(f)-(g) - Review and
Update Ordinance and
Precise Plan Residential
Standards
f) Identify additional Gatekeeper exemptions for residential projects based on location, size, affordability and other policy goals g) Hold at least one Gatekeeper meeting per year, which may be limited to residential or residential mixed-use projects only, creating greater opportunities for project-specific
rezonings
Hold an annual
Gatekeeper
meeting, which
may be limited or
focused on
residential or
residential mixed-
use projects at
Council discretion,
and begin
accepting
Gatekeeper
applications
before June 30,
2024.
Completed.
June 2024 - Gatekeeper applications were accepted.
Webpage: https://www.mountainview.gov/our-city/departments/community- development/planning/regulations/gatekeeper
September 10, 2024 - Gatekeeper authorization hearing occurred.
Council:
https://mountainview.legistar.com/LegislationDetail.aspx?ID=6852931&GUID=060AF 692-8429-49E4-BB09-0D8FF5906507&Options=&Search=
Exhibit 1
1.3(d) - Review and Update
Ordinance and Precise Plan
Residential Standards
d) Adopt a TDM Ordinance that provides clear requirements for residential trip reduction across all precise plans and zoning districts and update precise plans as needed. Through the ordinance, study the cost of TDM requirements on typical residential developments, and allow residential developers to meet TDM goals through lower-cost options. Update the zoning ordinance to allow residential parking reductions for projects that implement TDM and exempt parking requirements from projects meeting enhanced TDM criteria (Program
1.2).
Adopt a Citywide
TDM ordinance by
December 31,
2026.
In progress.
The following have been completed: existing conditions analysis, visioning and development of a draft ordinance framework that includes TDM performance standards, a TDM menu of options, and ordinance management tools.
Webpage: https://www.mountainview.gov/our-city/departments/public- works/transportation/transportation-planning/transportation-demand-management- tdm
1.3(a), (c) - Review and
Update Ordinance and
Precise Plan Residential
Standards
a) Conduct a development prototype study, update definitions as necessary for consistency between plans and districts, and revise multifamily development standards in major districts (including R3) and Precise Plans to ensure projects can, at minimum, meet their allowed density and are economically feasible, where possible through reductions of physical development standards. Economic feasibility and the cumulative effects of standards will be inputs in the reduction of standards. Where appropriate, calibrate standards to lot size. Focus on standards with the greatest feasibility impacts on underutilized sites, such as open area, parking, and building coverage.
c) Ensure that zoning code is updated to reflect densities and other standards as required by state law (e.g., SB 478)
Conduct prototype
study and
evaluate
standards outside
the Zoning
Ordinance by
June 30, 2025.
(a) Prototype study in progress (with R3 Zoning Disrtict Update). Council direction on prototype study for highest densities tentatively expected in March. Prototype studies for lower densities not started.
(c) In progress. Carried out with R3 Zoning District Update.
R3 Website: https://mountainview.gov/r3zoningupdate
1.3(b) - Review and Update
Ordinance and Precise Plan
Residential Standards
b) Compile, evaluate and refine requirements outside the Zoning Ordinance, including Heritage tree preservation and Public Works standards and requirements
Conduct prototype
study and
evaluate
standards outside
the Zoning
Ordinance by
June 30, 2025.
(b) In progress
Public Works application submittal checklists have been created and/or updated, and available on the City website. Public Works will continue to update Public Works standards, design criteria and requirements as needed. Other standards related to tree preservation still being developed.
Webpage: https://developmentpermits.mountainview.gov/about-permits/water-service- application/-folder-567
Exhibit 1
1.4 - Religious and
Community Assembly Sites
for Housing
Create more affordable housing in the City’s highest opportunity neighborhoods by allowing deed-restricted affordable multifamily housing on non-Historic, non-profit, religious and community assembly sites in R zones south of El Camino Real. Typical densities will be based
on an analysis of viable affordable housing prototypes.
Goal of at least 65 units proposed on religious/institutional sites south of El Camino Real by 2027.
Incentivize such development through ongoing actions, such as outreach, funding and promotional materials.
Complete zoning
amendments by
December 31,
2024.
In progress (Late). Estimated Completion Date: Q4 2025
Work being completed in conjunction with Program 2.6. Completed site identification, outreach to property owners, affordable housing developers, and non-profit advocates, site analysis and EPC Study Session.
Pending - Council direction tentatively scheduled for March 2025 EPC Study Session:
https://mountainview.legistar.com/MeetingDetail.aspx?ID=1247457&GUID=6A07C3A 4-3E08-43E8-92AA-9F82F37EF5E2&Options=info|&Search=housing
1.5 - Non-conforming R1
and R2 Multifamily
Developments
Allow more flexibility for building upgrades, additions and structural alterations that can prolong the life of the building without reducing the number of units on site.
Conserve 600 units in multi-family development in R1 and R2 districts where there is currently non-conforming density of residential units.
Inform property
owners of the
proposed Zoning
Ordinance update
that would allow
them to
preserve units by
June 30, 2025.
Complete Zoning
Ordinance update
by December 31,
2025.
Ongoing
monitoring of
identified sites in
the R1 and R2
In progress.
1.6 - SB9 DUO Subdivisions
Facilitate the creation of middle-income ownership units in the City’s highest opportunity single family neighborhoods through subdivision of DUO developments.
Create additional economic incentives to build DUOs through subdivision opportunities.
Address potential operations with 2-unit subdivisions, such as owner conflicts or requests for additions/modifications.
Adopt Zoning and
Subdivision
Ordinance
Amendments by
December 31,
2026.
Not yet started.
1.7(d) - Monitor and
Promote Accessory Dwelling
Units, Junior Accessory
Dwelling Units and SB9
Developments
d) Participate in the Santa Clara County Collaborative’s development of an ADU Program and Resource Center which includes a countywide ADU website, plans gallery, guidebook, spotlight stories, calculator, and other tools to increase awareness. Provide staff assistance and user-friendly tools for the public for ADUs and SB9 projects.
Update City
webpage with
resources
developed by the
Collaborative by
December 31,
2023.
Completed. The City ADU webpage includes resources developed by the Collaborative.
Webpage: https://developmentpermits.mountainview.gov/residential/accessory- dwelling-units
Exhibit 1
1.7(a), (b), (c) - Monitor and
Promote Accessory
Dwelling Units, Junior
Accessory Dwelling Units
and SB9
Developments
a) Develop an ADU/JADU/SB9 Monitoring Survey to collect data from project applicants during the building permit application process in order to enhance the existing tracking of ADUs/JADUs/SB9 production with more details such as occupancy status and rent levels at time of occupancy.
b) Utilize the data collected from the Monitoring Survey to better understand the income groups they serve and inform future improvements to the outreach and educational efforts
c) Continue to track and monitor the number and rents of ADUs/JADUs/SB9 Developments proposed and constructed and the progress of meeting RHNA assumptions of 30 units per year.
Implement ADU
monitoring survey
by December 31,
2024.
Completed. ADU monitoring survey sent December 17, 2024 See sample survey: https://cityofmountainview-
hrhcy.formstack.com/forms/adu_homeowner_survey
1.8(a) - Park Land
Ordinance Update
a) Complete Phase 2 of the Park Land Dedication Ordinance update and the Parks and Recreation Strategic Plan. Analysis that would support fee reductions could include: Review of best-practices for parkland acquisition funding; Pursuit of grants and other funding sources; Review of the City’s population density assumptions; Opportunities for private development to provide public open space through existing zoning requirements (e.g., POPAs); Development incentives and exceptions to standards for public open space By December 31,
2024, adopt the
Parks and
Recreation
Strategic Plan
(addressing
anticipated open
space needs and
long-term funding
strategies).
In progress. Estimated Completion Q4 2025.
Completed public input process 8/2023-7/2024 and established existing condition and analysis. Currently drafting recommendations.
Webpage: https://collaborate.mountainview.gov/imaginemvparks
1.8(b) - Park Land
Ordinance Update
b) Adopt a Nexus Study that compares the City’s in-lieu fee to other cities, incorporates other sources of funding, revises valuation methodology, establishes criteria for all or partial payment of fees at project occupancy, and other factors for the adoption of lower residential park in-lieu fees. Prior to the adoption of these fees, reevaluate the cumulative impact of all residential fees.
By December 31,
2025, adopt the
Nexus Study,
reduced fees,
alternate
mitigations and/or
other programs to
reduce costs on
residential.
In progress. Pending consultant selection.
Exhibit 1
1.9 - BMR Program Review
Increasing the diversity, supply, and affordability of housing. Achieving the BMR objective standard of realizing BMR units on-site and integrated with market-rate units for both rental and ownership projects.
Evaluating best practices and incorporate modifications if any to enhance the efficacy of the program to fulfill the City’s goals of providing housing to meet a range of housing needs, including housing at a range of affordability levels, sizes, and locations.
The program will be assessed as part of the larger continuum of housing programs provided by the City, as one tool to meet the City’s larger Housing Element goals, such as meeting the
RHNA, providing housing for large families, providing housing affordable to households with moderate incomes, providing ownership opportunities for low and moderate income households, and providing housing at various locations throughout the City. The report will analyze the production of BMR units over the initial three years of the program, as well as associated fees collected or affordable housing created through other alternative mitigation strategies. The report will be presented to the City Council.
Complete the first
review of the BMR
Phase 2 program
against the
objectives and
present
the first review
report to City
Council in 2023.
Implement actions
based on the
review as
directed by City
Council.
Completed review of the BMR Phase 2 program. Council Study Session held on 12/12/2023. Actions based on City Council direction are being implemented.
Council:
https://mountainview.legistar.com/View.ashx?M=A&ID=1063209&GUID=481A3613- B870-4EAF-80FA-CAF6436C9E7D
1.9 - BMR Program Review
Increasing the diversity, supply, and affordability of housing. Achieving the BMR objective standard of realizing BMR units on-site and integrated with market-rate units for both rental and ownership projects.
Evaluating best practices and incorporate modifications if any to enhance the efficacy of the program to fulfill the City’s goals of providing housing to meet a range of housing needs, including housing at a range of affordability levels, sizes, and locations.
The program will be assessed as part of the larger continuum of housing programs provided by the City, as one tool to meet the City’s larger Housing Element goals, such as meeting the
RHNA, providing housing for large families, providing housing affordable to households with moderate incomes, providing ownership opportunities for low and moderate income households, and providing housing at various locations throughout the City. The report will analyze the production of BMR units over the initial three years of the program, as well as associated fees collected or affordable housing created through other alternative mitigation strategies. The report will be presented to the City Council.
Complete the
second review
and present the
second review
report to City
Council in 2028.
Implement actions
based on the
review as directed
by City Council.
Not yet started.
1.10 - Density Bonus
Ensure City codes and procedures are consistent with State law by monitoring and implementing new State legislation (such as AB 2334).
Maintain production of units containing affordable housing through the review and approval of projects consistent with the State Density Bonus Law and its local provisions.
Ongoing-- every
year review State
legislation for
updates that may
affect the City’s
Density Bonus
program.
Ongoing. City Staff and legal team continue to work together to ensure City Code consistency with new State legislation.
Exhibit 1
1.11 - No Net Loss of
Housing Element Sites
Ensure adequate capacity for the City’s RHNA by maintaining a list of opportunity sites that accommodates the City’s RHNA and initiating a rezoning process for new sites if the buffer falls below 5 percent, after accounting for development projects under review.
Separately account for no net loss of lower income capacity in the parts of the City with highest opportunity: south of El Camino Real and near Downtown (between Mariposa Avenue, El Camino Real, SR-237, SR- 85 and Central Expressway). The lower income capacity of this area shall not fall below 830 units (20% fewer than the inventory and pipeline units in
this area at adoption).
If the City receives
an application for
a new
construction
development
project on a
housing element
site with fewer (or
greater) units at
the given income
level than shown
in the site
inventory
(including pipeline
sites), those units
will be
provisionally
removed from (or
added to) the
inventory. If the
project is
approved (building
permit approval
for ministerial
projects), they will
be officially
removed from (or
added to) the
inventory.
Annually update
and report on the
provisional and
Ongoing. See Staff Report. The provisional and official inventory buffers are above 5% at all income levels.
1.12 - Maintenance of
Existing Housing Stock
Respond to housing code violations through the Code Enforcement, CSFRA petition and Multi-family Housing Inspection programs.
Enforce CSFRA provisions that limit rent increases and displacement impacts to tenants when violations are found.
Rehabilitation and upgrades at affordable housing
developments/CSFRA units.
Ongoing
implementation
and enforcement
of Code
Enforcement,
CSFRA Petition
and
Multifamily
Housing
Inspections,
utilizing the
compliance order
process, including
landlord
penalties.
Ongoing.
993 inspections for R2 and 997 in unit inspections for multi-family housing were conducted. Staff received 25 referrals from CSFRA, suppression company referrals, and 9 direct resident complaints
Rent Stabilization provides ongoing education and outreach to tenants and landlords regarding CSFRA requirements, developing materials as needed. Additional outreach has been conducted through the community engagement for the MHRSO and TRAO updates (2 stakeholder community meetings for the TRAO occurred in July 2024)
Exhibit 1
1.12 - Maintenance of
Existing Housing Stock
Respond to housing code violations through the Code Enforcement, CSFRA petition and Multi-family Housing Inspection programs.
Enforce CSFRA provisions that limit rent increases and displacement impacts to tenants when violations are found.
Rehabilitation and upgrades at affordable housing
developments/CSFRA units.
By December 31,
2024, prepare
additional
outreach and
marketing
materials to
tenants and
landlords
regarding tenants’
rights to
habitability and
safety without rent
increases under
the
CSFRA.
Completed.
Rent Stabilization provides ongoing education and outreach to tenants and landlords regarding CSFRA requirements, developing materials as needed. Additional outreach has been conducted through the community engagement for the MHRSO and TRAO updates as part of implementing Program 3.2 (3 stakeholder community meetings for the TRAO occurred in July 2024, and 3 meetings for MHRSO in October 2024)
1.12 - Maintenance of
Existing Housing Stock
Rehabilitation and upgrades at affordable housing
developments/CSFRA units.
Ongoing
as
sessment and
funding of
improvements at
affordable housing
projects.
Ongoing.
On March 19, 2024, City Council supported working towards a $20 million funding pool for the acquisition/preservation of 50 CSFRA units (related to Program 3.2), which would include rehabilitation/renovation costs. The City is seeking external funding partnerships such as through State and federal agencies, local and regional public agencies, foundations/philanthropic organizations, and the private sector. The City does not have $20 million but has committed $4 million in City housing funds contingent upon and in an effort to catalyze $16 million in external funding partnerships.
1.13 - Sustainable Housing Streamline green building review and development of more sustainable (cost-effective and energy-efficient) housing.
Ongoing
Training should
occur at least two
times during the
planning cycle
Ongoing. Building Division staff completed an EduCode code seminar training in March 2023. No trainings occurred in 2024.
Exhibit 1
2.1 - Subsidize and Support
Affordable Housing
Programs
Make more housing available to households otherwise left out of the Mountain View housing market, such as whether the calculation of BMR prices/rents cause a barrier to qualifying for the units because HCD income levels increase faster than the incomes of our residents who seek BMR housing.
Produce at least 200 supportive housing units for households who have experienced homelessness.
Increase the share of two- and three- bedroom units in the City's affordable housing stock.
Increase the number of ownership opportunities for middle-income households, and market those opportunities to historically excluded populations.
Increase the number of units built for special needs populations and market those units to organizations that support disabilities.
Funding
opportunities will
be made available
ongoing via the
City's NOFA
process and other
programs.
Ongoing
evaluation of
needed units for
populations with
special needs,
and funding
opportunities
through the City's
NOFA process as
needed and
available.
Ongoing.
Developer selection process for City-owned site (87 E Evelyn) completed September 2023 to build 263 affordable units. $8 million of City funds committed to Affirmed Housing on December 12, 2025.
Additionally, the following projects have received City funding from the City's NOFA process:
- 96 West El Camino Real - $8,000,000
- 1020 Terra Bella Avenue - $13.5 million
- Crestview Hotel - $9 million
- 57-67 E Evelyn Ave - $11.3 million (of which $5 million in acquisition financing) The City has prioritized funding for NOFA applicants that include half of their total units as two-and three-bedroom units, including the projects referenced above. In addition, in March 2022, the City entered into a Memorandum of Understanding with the County of Santa Clara to assist with funding of projects in Mountain View via the County's Measure A housing bond proceeds. Under this MOU, all projects supported will include Rapid Rehousing and Permanent Supportive Housing units, serving families and households who are experiencing or at risk of homelessness. The MOU will facilitate approximately 200 units of supportive housing units in Mountain View.
Round table held with public service providers was held on May 20, 2024 to discuss increased universal design standards in BMR units. The City is evaluating increasing accessibility standards in BMR units.
Exhibit 1
2.1 - Subsidize and Support
Affordable Housing
Programs
Make more housing available to households otherwise left out of the Mountain View housing market, such as whether the calculation of BMR prices/rents cause a barrier to qualifying for the units because HCD income levels increase faster than the incomes of our residents who seek BMR housing.
Produce at least 200 supportive housing units for households who have experienced homelessness.
Increase the share of two- and three- bedroom units in the City's affordable housing stock.
Increase the number of ownership opportunities for middle-income households, and market those opportunities to historically excluded populations.
Increase the number of units built for special needs populations and market those units to organizations that support disabilities.
Staff will evaluate
innovative
programs over the
housing element
period, bringing
findings to the
Council as
appropriate. This
will include
research as part
of the 2022-2024
Breakthrough
Grant to identify
and implement
affordable housing
funding programs,
displacement
response strategy,
and
outreach/educatio
n/community
building efforts.
This may include
study sessions on
affordable housing
and displacement.
Once research is
complete, if
directed to pursue
further, develop
program with 5
As discussed in 1.12 and 3.2, Council supported working towards a $20 million acquisition/preservation fund for CSFRA units, and committed $4 million in City housing funds contingent upon external funding partners contributing $16 million.
As discussed in 3.2., in September 2024, the City initiated development of a Community Ownership Action Plan to evaluate innovative housing models.
2.2 - Pilot ADU & SB9
Financial Incentives
Program
Continue to reduce costs of developing ADUs through exemptions from impact fees.
Support economic feasibility of ADUs and DUOs by making funds available to households who would like to build them but would otherwise not be able to afford to develop these units
Increase the supply of naturally-affordable or deed-restricted affordable rental housing in
Mountain View through the development of more ADUs and DUOs Decrease pressure on market-rate housing market by increasing density on single-familysites, which are focused on areas of highest opportunity.
Perform a needs
assessment and
identify best
practices by
December 2025.
In progress.
As part of BMR Ordinance revision, Staff will study reduced or waived in-lieu fees.
Exhibit 1
2.2 - Pilot ADU & SB9
Financial Incentives
Program
Continue to reduce costs of developing ADUs through exemptions from impact fees.
Support economic feasibility of ADUs and DUOs by making funds available to households who would like to build them but would otherwise not be able to afford to develop these units
Increase the supply of naturally-affordable or deed-restricted affordable rental housing in
Mountain View through the development of more ADUs and DUOs Decrease pressure on market-rate housing market by increasing density on single-familysites, which are focused on areas of highest opportunity.
Develop a pilot
program informed
by the needs
assessment by
December 2026.
Assess pilot for
continuation
based on
objectives and
metrics by
December 2028.
Not yet started.
2.3 - Reasonable
Accomodation
Review and approve requests to modify development standards to reasonably accommodate person with disabilities, including persons with developmental disabilities.
Update Zoning
Ordinance to
remove
requirements or
findings
associated with
Reasonable
Accommodation
application
procedures
related to adverse
impacts to
surrounding
properties or
uses. (Program
1.1)
Completed December 6, 2023.
Council Adoption:
https://mountainview.legistar.com/LegislationDetail.aspx?ID=6438614&GUID=BC7A A7B8-4209-4C82-9D48-DD2666124B7D&Options=&Search=
2.3 - Reasonable
Accomodation
Review and approve requests to modify development standards to reasonably accommodate person with disabilities, including persons with developmental disabilities.
Produce and
make available
informational
materials on the
program by June
30, 2024.
Informational materials are posted on the City webpage as a Reasonable Accommodation form. https://developmentpermits.mountainview.gov/about- permits/apply-for-permit/planning-permit
Exhibit 1
2.4 - Inclusive and Equitable
Affordable Housing
Application Processes
Review BMR and NOFA application process for inclusivity for language access, technological access, and other options to reduce/remove barriers and make adjustments to increase inclusivity.
Remove barriers to accessing affordable housing.
Observed diverse and robust participation in City affordable housing information sessions, clinics, lotteries, and waitlists.
Increase outreach
and technical
assistance to
facilitate access of
underserved
communities to
affordable housing
by removing
language,
technology, and/or
other barriers.
Potential actions
as described in
Program.
Evaluate
effectiveness of
changes at least
once during the
planning period to
support equitable
representation on
waitlist and
interest lists.
Include this
evaluation in 2028
BMR review as
well.
Not yet started.
2.5 - Mediation and Fair
Housing Programs
a) Fund fair housing education, enforcement, and counseling to prevent fair housing violations and help community members understand and assert their rights.
b) Provide financial support to mediate housing issues involving City residents, with a focus on tenant/property owner mediation and eviction prevention.
Annually fund fair
housing and
mediation
services.
Continuously
provide
information about
tenant and
landlord rights.
Target at least
one annual
outreach/educatio
n event targeted
Complete - on-going basis
The Rent Stabilization Division continuously updates information about tenant and landlord rights. Information handouts updated in November 2023.
Rent Stabilization Division hold bi-weekly outreach/education events to tenants, local property owners and managers of these programs on a bi-weekly basis. The City continues to fund fair housing and mediation services that are available at no cost to tenants and landlords.
The Rent Stabilization Division holds annual workshops to educate and raise awareness among local residents, property owners and managers about the mediation programs.
Exhibit 1
2.6 - Affirmatively Further
Fair Housing
Remove impediments to fair housing and provide equitable access to housing and opportunity.
Update
Assessment of
fair housing as
required by HUD
with the first
update completed
in 2023, and
subsequent
updates based on
Assessment of Fair Housing completed in 2023. Current HUD administration does not require additional updates to AFH.
2.6 - Affirmatively Further
Fair Housing
Improve access to affordable housing in the City's high-opportunity neighborhoods through implementation of programs 1.3, 1.4, 1.5, 1.6,
1.7, 1.11, 2.2, and 4.5.
In addition to 65 units through Program 1.4, and 120 units (based on half the City's R1 properties) expected south of El Camino Precise Plan through Program 1.7, the City will develop and adopt incentives and zoning to facilitate property owners south of the El Camino Real Precise Plan (other than churches) to dedicate land to affordable housing developers or build affordable housing. The incentives and zoning will target the development, in expectation, of at least 100 additional affordable units.
Develop and
adopt incentives
and zoning
changes by
December 31,
2024. If 40 units
are not proposed
by December 31,
2027, or if those
units do not
proceed, the City
will conduct
further outreach to
determine policies
that would better
encourage these
projects and
address
government
constraints. The
City will either
adopt these
policies or other
policies that
reduce constraints
on affordable
housing south of
the El Camino
Real Precise Plan
by December 31,
2028.
In progress. Estimated Completion: Q4 2025
Work being completed in conjunction with Program 1.4. Completed site identification, outreach to property owners, affordable housing developers, and non-profit advocates, site analysis and EPC Study Session.
Pending - Council direction tentatively scheduled for March 2025 EPC Study Session:
https://mountainview.legistar.com/MeetingDetail.aspx?ID=1247457&GUID=6A07C3A 4-3E08-43E8-92AA-9F82F37EF5E2&Options=info|&Search=housing Exhibit 1
3.1 - Homelessness
Prevention and Services for
the Unhoused
a) Develop and implement a strategy to support those who are unhoused and prevent people from becoming unhoused
Develop strategy
by December 31,
2024. Strategy will
address critical
programs to
prevent and
respond to
homelessness as
described in the
program.
In progress (Late). Estimated Completion Q2 2025.
The draft Homeless Response Strategy with Implementation and Expenditure Plan has been complete. Council Study Session scheduled for 1/28/25.
Study Session:
https://mountainview.legistar.com/LegislationDetail.aspx?ID=7104439&GUID=B4A59 B4A-6AA3-4D29-A99F-F2F8FC7255C5&Options=&Search=
Webpage: https://www.mountainview.gov/our-city/departments/city-manager-s- office/human-services/homelessness/homelessness-response-strategy-and- expenditure-plan
3.1 - Homelessness
Prevention and Services for
the Unhoused
b) Continue to partner with the Mountain View Los Altos Community Services Agency (CSA), LifeMoves and similar agencies that provide services and/or shelter to the unhoused community members, such as offering financial support and advertising available programs to residents living in the City.
Annually support
CSA, LifeMoves
and other partner
agencies as part
of Annual Plan.
City continues to fund CSA for housing problem-solving and referral and case management services. For FY24-25, the City provided CSA $162,000 and authorized a $1,000,000 capital funding agreement to CSA for capital improvements to current and future CSA facilities.
3.1 - Homelessness
Prevention and Services for
the Unhoused
c) Participate in regional homeless programs that support short-term shelter and transitional housing programs that accommodate families and individuals from Mountain View.
d) Allow emergency shelters pursuant to AB 2339 (see program 1.1) Fewer evictions than in the past.
Maintain at least 100 shelter or interim housing spots.
Develop at least 200 supportive housing units.
Data showing households moving from shelter and interim housing to Mountain View-based permanent housing.
Regularly support
the development
of permanent
housing via
regular NOFA
process or
through marketing
City-owned sites.
See program 1.1
for AB2339
timeframe.
The City has the following number of interim and supportive housing units:
- 100 units of interim housing (LifeMoves Mountain View) - 48 units of permanent supportive housing constructed
- 163 units of rapid rehousing /permanent supportive housing in the City's affordable housing pipeline.
Exhibit 1
3.2 - Displacement
Prevention and Mitigation
Prevent/mitigate displacement of households, including those in mobile homes, and prevent the loss of naturally occurring affordable units.
Conserve and improve existing affordable housing stock.
Continuously
enforce the
Tenant Relocation
Assistance
Ordinance,
Community
Stabilization and
Fair Rent Act
(CSFRA), Mobile
Home Rent
Stabilization
Ordinance
(MHRSO),
Condominium
Conversion
Ordinance (CCO),
and relevant state
tenant protection
laws.
Ongoing. The Rent Stabilization Division of the Housing Department continually enforces TRAO, CSFRA, and MHRSO. Staff supports the Rental Housing Committee, which is the body that implements the CSFRA and MHRSO. Compliance with CCO is achieved through Community Development Department during project review.
3.2 - Displacement
Prevention and Mitigation
Prevent displacement through rent stabilization; deed restriction; housing preservation work; community ownership models ; and/or Opportunity to Purchase Act (OPA) Programs.
- Replace all rent-stabilized units through SB 330 and enforce right of first refusal. Develop local replacement requirements
- Assist all displaced eligible tenants in receiving SB 330/Tenant Relocation Assistance to partially mitigate displacement impacts.
Evaluate the efficacy of TRAO in meeting antidisplacement goals - Evaluate the
efficacy of TRAO
by December 31,
2024.
Completed. Two stakeholder meetings conducted to evaluate efficacy of TRAO and to discuss local replacement requirements: one with landlords and landowners; and another with tenants. Study session with Rental Housing Committee - 11/14/24.
Council Study Session - 12/17/24.
CC Study Session:
https://mountainview.legistar.com/LegislationDetail.aspx?ID=7052426&GUID=C8131 714-B534-4A90-9A68-55B6F03015E1&Options=&Search=
Exhibit 1
3.2 - Displacement
Prevention and Mitigation
Apply for outside funding sources (Programs 4.2, 4.3, and 4.4) and develop funding partnerships to invest at least $10 million to support the preservation/acquisition of naturally affordable units via the community ownership model.
- Assist in preserving at least two naturally occurring affordable housing projects during the planning period, and aim to preserve more, to both preserve units and create a viable space for displaced residents to move. Provide support to community groups on potential
acquisition/preservation opportunities.
-Develop funding
strategy for
affordable
housing
preservation by
December 31,
2025.
- Target
expenditure of
funds to assist in
preserving at least
two naturally
occurring
affordable housing
projects during the
planning period.
Completed. On-going. At the 3/19/24 Council Study Session, Council supported working towards a $20 million acquisition/preservation fund and committed $4 million with the goal of acquiring/preserving 50 CSFRA units, contingent upon leveraging $16 million in external funding partnerships. The City also applied for the HUD PRO Housing grant requesting $4 million in matching funds but was not awarded funds in this round.
CC Study Session 3/19/2024:
https://mountainview.legistar.com/LegislationDetail.aspx?ID=6575489&GUID=412A4 58C-D4FE-4CE0-B4B8-D60CBD3BB531&Options=&Search=
Exhibit 1
3.2 - Displacement
Prevention and Mitigation
- Assist tenants in understanding their housing rights via the Housing and Eviction Help Center (Program 2.5).
- Inform property owners of their responsibilities related to just cause evictions and habitability under the CSFRA, MHRSO, and relevant state laws, via regular webinars (Programs 1.12 and 2.5) - Maintain habitability of naturally occurring affordable housing via regular code enforcement through the multi-family housing inspection program.(Program 1.12)
- Provide benefits and relocation assistance to displaced residents to partially mitigate impacts of displacement, with the goal of having a comprehensive strategy to prevent displacement before the expiration of SB 330.
- As part of the
Displacement
Response
Strategy project,
propose anti-
displacement
strategies to
Council in 2023,
including local
replacement
requirements and
community
ownership models
and Opportunity to
Purchase Act
(OPA) Programs.
Develop
comprehensive
potential
“alternatives to
displacement,” via
first right of
refusal
requirements,
displaced-resident
preferences,
partnerships with
developers on
alternative units
for displaced
residents, and
Completed. Council Study Session held on 10/10/2023 regarding local replacement requirements that would go into effect post SB330. Followup Study Session on 3/19/2024 to discuss community ownership models and OPA.
CC Study Session 10/10/2023:
https://mountainview.legistar.com/LegislationDetail.aspx?ID=6374156&GUID=EEB6B FD8-3A8C-4ECC-8BC1-C7A7DFB280C2&Options=&Search=
CC Study Session 3/19/2024:
https://mountainview.legistar.com/LegislationDetail.aspx?ID=6575489&GUID=412A4 58C-D4FE-4CE0-B4B8-D60CBD3BB531&Options=&Search=
3.2 - Displacement
Prevention and Mitigation
Prevent/mitigate displacement of households, including those in mobile homes, and prevent the loss of naturally occurring affordable units.
Conserve and improve existing affordable housing stock.
Continuously
enforce the
Tenant Relocation
Assistance
Ordinance,
Community
Stabilization and
Fair Rent Act
Ongoing
The Rent Stabilization Division of the Housing Department continually enforces TRAO, CSFRA, and MHRSO. Staff supports the Rental Housing Committee, which is the body that implements the CSFRA and MHRSO. Compliance with CCO is achieved through Community Development Department.
Exhibit 1
3.2 - Displacement
Prevention and Mitigation
Prevent/mitigate displacement of households, including those in mobile homes, and prevent the loss of naturally occurring affordable units.
Conserve and improve existing affordable housing stock.
Objectives and Metrics (continued):
- Create a community ownership action plan for a community ownership model/structure that, with community partners, could address housing needs that are not met through traditional affordable housing and that could take part in preservation and acquisition activities. The action plan will identify the City’s and other organizations’ responsibilities, establish a schedule such that acquisition could occur within two years, depending on the timing of funding opportunities and the fulfillment of other organizations’ responsibilities.
Develop
community
ownership action
plan by June 30,
2025. Objective
for community
ownership models
to
acquire/preserve
at least 50
housing units that
would remain
affordable (e.g.,
around 30% of
household
income).
In progress. Community ownership action plan (COAP) consultant was selected in September 2024.
3.2 - Displacement
Prevention and Mitigation
Prevent/mitigate displacement of households, including those in mobile homes, and prevent the loss of naturally occurring affordable units.
Conserve and improve existing affordable housing stock.
Objectives and Metrics (continued):
- Study amendments to the Mobile Home Rent Stabilization Ordinance (MHRSO) such that allowed rent increases are consistent with or less than comparable jurisdictions with rent control for mobile home parks.
Study updates to
MHRSO regarding
allowed rent
increases and
adopt (if directed
by Council) by
March 31, 2025.
Completed. Item was presented to the RHC on 12/12/24 and to City Council on 1/28/25. The Ordinance amendments are scheduled for the first reading on 3/13/25 and second reading on 3/25/25.
Reviewed at City Council 1/28/25
https://mountainview.legistar.com/LegislationDetail.aspx?ID=7104443&GUID=B99F9 C13-70F7-4E28-804E-91F8816E2427&Options=&Search=
4.1.a - Development
Streamlining and
Processing Revisions
Review and update the City's affordable Housing NOFA process to improve coordination and communication internally (e.g., coordination between Housing, Planning and other departments and internal processes in Planning and other departments) and with applicants.
Encourage affordable housing developers to work with outside funding sources to leverage vthe City's local funds to the maximum extent possible. Initial steps in the review include additional developer roundtables, garnering consultant advice, and reviewing other public agency best practices. In addition, the City will continue to facilitate and support 100% affordable housing development in the review process, by utilizing trained staff in each Department and Division involved in the development review and building permit processes, and by utilizing streamlining opportunities. The staff members will be trained in processes, requirements, timelines, and financing specific to affordable housing projects.
Facilitate at least 1,100 units of 100% affordable development by streamling the funding approval process, prioritizing staff review, utilizing State streamlining (e.g., SB35).
Review and
update NOFA
process by June
30, 2024.
Completed. Study Session held with Council NOFA Review Committee on 06/17/2024 regarding Review and Update of the Notice of Funding Availability (NOFA) process. Actions based on NOFA Review Committee direction are being implemented.
https://mountainview.legistar.com/MeetingDetail.aspx?ID=1205658&GUID=E12BF56 D-3C80-4677-A126-29A14D4EA91C&Options=info|&Search=
Exhibit 1
4.1.b - Development
Streamlining and
Processing Revisions
Review development and post-development processes, timelines, and approval body levels to streamline permitting processes. Adopt procedures that improve internal coordination and staff throughput. - Identify thresholds for multifamily projects that can be eligible for ministerial approvals.
- Reduce the number of compliant projects in Precise Plans that require Council hearings.
Update the Zoning
Ordinance
process and
approval bodies
by December 31,
2026.
Not yet started.
4.1.c - Development
Streamlining and
Processing Revisions
Continue to implement the 2021 Development Review Assessment (“Matrix Study”), building off of completed recommendations (such as revisions to Project Coordinating Committee process, updated application forms, application inactivity policy, and creation of Permit Navigator position)
Implement 2021
Matrix Study
recommendations,
as described in
the Program
In progress. Building, Planning and Public Works have transitioned to a new system, which allows for standardized comments.
ePermits: https://mountainview-ca-us.avolvecloud.com/Portal/Home/ServiceScreen Data for the City's GIS systems are still being developed, but anticipates that the Current Projects Map will be completed by Q1 of 2025.
Staff is currently reviewing software systems to create a dashboard to track historic and currrent performance indicators.
4.1.d - Development
Streamlining and
Processing Revisions
Acquire additional tools and software that will improve development review, monitoring of housing supply, management of funding, transparency of data and approvals, and other processes involved in housing development for staff and public use.
Bring the city fully into compliance with new transparency legislation by posting project-specific fees online.
Bring City into full
compliance with
transparency
requirements as
soon as possible.
Acquire additional
software and tools
as identified.
Completed. The City is compliant with the transparency requirements and posting of plans.
Acquisition of other software and tools is ongoing.
4.2 - Federal, State, and
Regional Policy Initiatives
a) Advocate for, propose, and shape legislation that increases the ability to develop affordable housing, prevent displacement, and remove impediments to accessing housing.
b) Support regional funding measure to support affordable housing.
Participate in the
planning process
for a 2024
regional housing
funding measure,
and
support such
measure.
Continuously
monitor federal
and State
legislation and
submit support
letters as
appropriate.
Propose
Ongoing. The City continues to monitor on-going legislation and will sponsor legislation based on Council direction.
Exhibit 1
4.3 - Financial Support for
Subsidized Housing
a) Examine new revenue sources and increases to existing revenue sources to meet extremely low- to moderate-income housing needs, including increasing housing impact fees on office development, and periodically consider updates to fees.
b) Perform asset management to ensure loan repayment.
c) Prioritize funding opportunities for lower-income and special needs population groups, suchas families and unhoused individuals. d) Provide about $40 million to make available for financing affordable and special needs housing units.
e) Develop local revenue ballot measure to fund affordable housing if regional measure is not implemented.
Produce at least 200 supportive housing units for households who have experienced homelessness.
Complete
evaluation of new
funding sources
by 2025; at least
once during the
planning period
conduct an
analysis to update
existing affordable
housing fees.
4.3.a - update to Housing Impact Fee is in underway (through County collaborative).
Update to the BMR In-Lieu Fee will be brought to Council as part of the BMR Ordinance revision in Fall 2025
4.3.b - Asset Management Guidelines have been drafted. City is exploring software for asset management.
4.3.c and d - the City has provided funding commitments to 7 projects that have provided or will deliver 92 Permanent Supportive Units & 119 Rapid Rehousing Units (211)
4.3.e - Measure G ballot measure passed in November 2024. This is expected to generate an estimated $9 million annually, a portion of this will be directed to affordable housing.
4.4 - Partnerships to
Support Affordable Housing
Explore partnerships with other public agencies and external partners to leverage funds and increase access to affordable housing programs.
In particular, explore “programmatic partnerships,” that leverage funds for a range of projects, to provide increased certainty to the City’s affordable housing pipeline. Potential partners as listed in the Program.
Increase funding available for affordable housing preservation, rehabilitation, and construction to meet funding gaps anticipated in pipeline with the goal of fulfilling the City’s RHNA goals for lowincome, very-low-income, and extremely-low-income units.
Continuously
develop
relationships with
partner agencies
and private
philanthropy to
find opportunities
to leverage
additional funding
for affordable
housing.
Secure enough
funding to support
identified near-
term pipeline
projects, likely
totaling over $66
million, by 2025,
as well as
additional funding
needed to support
the achievement
of the City’s
RHNA goals for
low-income, very-
low-income, and
extremely-low-
income units.
Secure additional
funding needed to
preserve and
Ongoing/in progress.
Discussions continue with non-profits and foundations to evaluate potential funding partnerships. Current successes for external funding have been through State and federal grant funding opportunities discussed in Program 4.3 above.
Exhibit 1
4.4 - Partnerships to
Support Affordable Housing
Explore partnerships with other public agencies and external partners to leverage funds and increase access to affordable housing programs.
In particular, explore “programmatic partnerships,” that leverage funds for a range of projects, to provide increased certainty to the City’s affordable housing pipeline. Potential partners as listed in the Program.
Increase funding available for affordable housing preservation, rehabilitation, and construction to meet funding gaps anticipated in pipeline with the goal of fulfilling the City’s RHNA goals for low-income, very-low-income, and extremely-low-income units.
Secure additional
funding needed to
preserve and
rehabilitate
projects to meet
City’s
antidisplacement
goals, likely
totaling over $50
million, by 2028.
The City secured the following grants/funding:
- $4.2 million from the State’s Local Housing Trust Fund (LHTF) grant; - $2.35 million in federal Community Project Funding (CPF) - $1.09 million from the States Permanent Local Housing Allocation (PLHA) grant; - $983,000 in federal HOME-ARP funding; and
- $870,000 from State Prohousing Incentive Program (PIP) The City applied for the following grants in 2024:
- $5 million in State LHTF
- $4 million in matching funds for HUD PRO Housing
- $3 million in Federal CPF funds
- $890,000 from the State PIP
4.5 - Partnerships with
Affordable Housing
Developers
Partner with subsidized housing developers to further affordable housing priorities. Specific sites listed in Housing Element Program Objectives and Metrics: 89 W El Camino Real, 96 W. El Camino Real, 1012 Linda Vista, 57-67 E. Evelyn.
Leverage a range of funding sources - including land dedication - to lower cost of affordable housing development, and thus increase affordable housing development. Specific sites listed in Housing Element Program Objectives and Metrics: 87 E. Evelyn, 1255 Pear Avenue, Middlefield Park Land Dedication Sites (two sites), North Bayshore Land Dedication Sites (six sites, three to be dedicated during the Housing Element period).
Develop at least 65 additional units of affordable housing Downtown, either through the BMR program or through development of one or more City-owned sites.
Create a priority list of amenities and community building opportunities to encourage in or near afforable housing developments
When
appropriate,
partner with
affordable housing
developers to
develop affordable
housing on City-
owned sites.
Identify the
remaining
Downtown
affordable units
needed to reach
65 units, and if
necessary
designating the
Downtown City-
owned site and
issuing the RFP
for affordable
housing
developers by
December 31,
2027.
In progress.
In 2023, 3 affordable projects received a commitment of City funding: 1020 Terra Bella, 1012 Linda Vista, and 96 W. El Camino Real, resulting in 257 affordable units.
December 17, 2024, City approved a lease with Affirmed Housing for 268 affordable housing units on City-owned 87 E Evelyn Avenue and appropriated $8 million. https://mountainview.legistar.com/LegislationDetail.aspx?ID=7052425&GUID=C637F 50A-C757-4059-96BF-BED66DE44031&Options=&Search=
May 14, 2024 - City appropriated $5 million to the Lot 12 affordable housing project for 120 units. Total City contribution for the project is $17.25 million. https://mountainview.legistar.com/LegislationDetail.aspx?ID=6664206&GUID=429BD 266-D864-4531-A5FD-E8B495854E9A&Options=&Search=
Exhibit 1
4.6 - Partnerships with
Employers
a) Study opportunities for short-term employee housing on sites zoned for office use, and implement if feasible
b) Create framework to collaborate with major employers (including large public entities) to provide workforce housing (potentially on office sites)
Analyze legal
constraints,
consistency with
State laws (such
as AB 2011 and
SB 6) and
consider a land
use framework for
short-term
employee
housing.
Meet with at least
five major
employers to
discuss
opportunities and
constraints for
workforce housing
(both permanent
and short-term),
and develop policy
recommendations
and bring before
Council by
December 31,
2025.
Not yet started.
Exhibit 1
4.7 - Neighborhood
Engagement
During the development review process, City staff will, in letters and discussions, encourage and facilitate housing developers to communicate and share information with neighborhood groups and other organizations regarding their proposed projects. City staff will provide facilitation as listed in the program.
The City will continue to make information about upcoming developments available on the City’s website, as well as providing contact information for key staff.
The City will continue to enforce the Tenant Relocation Assistance Ordinance when projects are displacing renters.
By December 31,
2023, the City will
have contacts,
and procedures
for maintaining
those contacts, for
a range of
neighborhood
groups and other
organizations
The City will
continuously
support
neighborhood
engagement and
transparency
about
developments,
and will improve
resources and
processes as
identified.
Completed. Housing provides Planning any updates from the Council Neighborhoods Committee neighborhood groups contact list. The list is currently up to date. The City maintains a "Stay Informed" webpage which is intended to support the ongoing maintenance of our noticing and interest lists. Website:
https://www.mountainview.gov/our-city/departments/community- development/planning/stay-informed
4.8 - School District
Coordination
Provide a copy of the Housing Element to school districts serving the City. Share information on new residential developments including number of units and bedrooms and demographic information with school districts.
Share a copy of
housing element
within one month
of adoption.
Share
development
information with
Districts annually.
Completed. Sent to School Districts June 21, 2023.
Data provided as requested, generally every few months.
4.9 - Water and Sewer
Service Coordination
Provide a copy of the Housing Element to Water and Sewer Utility staff and ensure that they understand that priority for connections must be given to housing developments that address the City's lower-income RHNA.
Share a copy of
housing element
within one month
of adoption.
Completed. Sent June 2, 2023.
4.10 - City Council Goal
Setting
Incorporate Housing Element programs and recommendations from the City's annual monitoring and review process into the City Council's goal- setting process. Ensure consistency between the Housing Element and other General Plan Elements throughout the planning period.
Annually Ongoing.
4.11 - Annual Monitoring
and Reporting
Per Government Code Section 65400, annually review the Housing Element and submit findings to the Office of Planning and Research and HCD.
Annually Ongoing.
Exhibit 1
Jurisdiction Mountain View ANNUAL ELEMENT PROGRESS REPORT Reporting Period 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Description of Commercial
Development Bonus
Commercial Development Bonus
Date Approved
3 4
APN Street Address Project Name+ Local Jurisdiction
Tracking ID+
Very Low
Income
Low
Income
Moderate
Income
Above Moderate
Income
Description of Commercial
Development Bonus
Commercial Development Bonus
Date Approved
Summary Row: Start Data Entry Below
Units Constructed as Part of Agreement
Commercial Development Bonus Approved pursuant to GC Section 65915.7 Table E
Note: "+" indicates an optional field
Project Identifier
1 2
Cells in grey contain auto-calculation
formulas
(CCR Title 25 §6202)
Annual Progress Report January 2020
Exhibit 1
Jurisdiction Mountain View ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Period 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
The description should adequately document how each
unit complies with subsection (c) of Government Code
Section 65583.1+.
For detailed reporting requirements, see the chcklist
here:
Extremely Low-
Income+ Very Low-Income+ Low-Income+ TOTAL UNITS+
Extremely Low-
Income+
Very Low-
Income+ Low-Income+ TOTAL UNITS+
https://www.hcd.ca.gov/community-
development/docs/adequate-sites-checklist.pdf
Rehabilitation Activity
Preservation of Units At-Risk
Acquisition of Units
Mobilehome Park Preservation
Total Units by Income
Table F
Please note this table is optional: The jurisdiction can use this table to report units that have been substantially rehabilitated, converted from non-affordable to affordable by acquisition, and preserved, including mobilehome park preservation, consistent with the standards set forth in Government Code section 65583.1, subdivision (c). Please note, motel, hotel, hostel rooms or other structures that are converted from non-residential to residential units pursuant to Government Code section 65583.1(c)(1)(D) are considered net-new housing units and must be reported in Table A2 and not reported in Table F.
Activity Type
Units that Do Not Count Towards RHNA+
Listed for Informational Purposes Only
Units that Count Towards RHNA +
Note - Because the statutory requirements severely limit what can be counted, please contact HCD at [email protected] and we will unlock the form which enable you to populate these fields.
Units Rehabilitated, Preserved and Acquired for Alternative Adequate Sites pursuant to Government Code section 65583.1(c) Annual Progress Report January 2020
Exhibit 1
Jurisdiction Mountain View ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates
an optional field
Reporting Period 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Notes
2 3 6
Prior APN+ Current APN Street Address Project Name+
Local
Jurisdiction
Tracking ID
Unit
Category
(2 to 4,5+)
Tenure
R=Renter
Very Low-
Income Deed
Restricted
Very Low-
Income
Non Deed
Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Total Moderate Income
Units Converted from Above
Moderate
Date Converted Notes
Summary Row: Start Data Entry Below 0 0 0 0 0 0 0 0
Table F2
Above Moderate Income Units Converted to Moderate Income Pursuant to Government Code section 65400.2 For up to 25 percent of a jurisdiction’s moderate-income regional housing need allocation, the planning agency may include the number of units in an existing multifamily building that were converted to deed-restricted rental housing for moderate-income households by the imposition of affordability covenants and restrictions for the unit. Before adding information to this table, please ensure housing developments meet the requirements described in Government Code 65400.2(b). 5 Project Identifier Unit Types
1 4
Affordability by Household Incomes After Conversion Units credited toward Moderate Income RHNA
Exhibit 1
Jurisdiction Mountain View
Reporting Period 2024 (Jan. 1 - Dec. 31)
Planning Period 6th Cycle 01/31/2023 - 01/31/2031 ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation
2 3 4
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Realistic
Capacity
Identified in the
Housing Element
Entity to whom the site
transferred Intended Use for Site
1 Summary Row: Start Data Entry Below
Note: "+" indicates an optional field
Cells in grey contain auto-calculation
formulas
Table G
Locally Owned Lands Included in the Housing Element Sites Inventory that have been sold, leased, or otherwise disposed of Project Identifier
NOTE: This table must only be filled out if the housing element sites inventory contains a site which is or was owned by the reporting jurisdiction, and has been sold, leased, or otherwise disposed of during the reporting year.
Exhibit 1
Jurisdiction Mountain View Note: "+" indicates an optional field Reporting Period 2024
(Jan. 1 - Dec.
31)
Cells in grey contain auto-calculation
formulas
Designation Size Notes
1 2 3 4 5 6 7
APN Street Address/Intersection Existing Use Number of
Units
Surplus
Designation
Parcel Size (in
acres) Notes
N
OTE: This table must contain an invenory of ALL
surplus/excess lands the reporting jurisdiction owns
Summary Row: Start Data Entry Below
Parcel Identifier
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Table H
Locally Owned Surplus Sites
For Santa Clara County jurisdictions, please format the APN's as follows:999-99-999 Exhibit 1
Jurisdiction Mountain View ANNUAL ELEMENT PROGRESS REPORT Reporting Period 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Project Type Date
2 3
APN Street Address Project Name+ Local Jurisdiction
Tracking ID+
Unit Category
(SH - Student Housing) Date Very Low- Income
Deed Restricted
Very Low- Income
Non Deed
Restricted
Low- Income Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate- Income
Deed Restricted
Moderate- Income
Non Deed
Restricted
Above
Moderate-
Income
Summary Row: Start Data Entry Below
Note
Cells in g
Table J
Student housing development for lower income students for which was granted a density bonus pursuant to subparagraph (F) of paragraph (1) of subdivision (b) of Section 65915 Project Identifier Units (Beds/Student Capacity) Approved 1 4
NOTE: STUDENT HOUSING WITH DENSITY BONUS ONLY. This
table only needs to be completed if there were student housing projects WITH a density bonus approved pursuant to
Government Code65915(b)(1)(F)
Annual Progress Report January 2020
Exhibit 1
Jurisdiction Mountain View ANNUAL ELEMENT PROGRESS REPORT Reporting Period 2024 (Jan. 1 - Dec. 31)
Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Yes
Table K
Tenent Preference Policy
Local governments are required to inform HCD about any local tenant preference ordinance the local government maintains when the jurisdiction submits their annual progress report on housing approvals and production, per Government Code 7061 (SB 649, 2022, Cortese). Effective January 1, 2023, local governments adopting a tenant preference are required to create a webpage on their internet website containing authorizing local ordinance and supporting materials, no more than 90 days after the ordinance becomes operational. ary.municode.com/ca/mountain_view/codes/code_of_ordinances?nodeId=PTIITHCO_CH36ZO_ARTXIVAFHOPR_DIV2REDEBERKTEHOPR_S36 Does the Jurisdiction have a local tenant preference policy? If the jurisdiction has a local tenant preference policy, provide a link to the jurisdiction's webpage containing authorizing local ordinance and supporting materials.
Notes
Exhibit 1
Jurisdiction Mountain View
Reporting Year 2024 (Jan. 1 - Dec. 31)
Total Award Amount Total award amount is auto-populated based on amounts entered in rows 15-26.
Task $ Amount Awarded $ Cumulative Reimbursement
Requested
Other
Funding Notes
Summary of entitlements, building permits, and certificates of occupancy (auto-populated from Table A2) Current Year
Deed Restricted 128
Non-Deed Restricted 17
Deed Restricted 135
Non-Deed Restricted 17
Deed Restricted 1
Non-Deed Restricted 17
769
1084
Current Year
Deed Restricted 84
Non-Deed Restricted 17
Deed Restricted 0
Non-Deed Restricted 17
Deed Restricted 1
Non-Deed Restricted 17
81 217
Current Year
Deed Restricted 48
Non-Deed Restricted 15
Deed Restricted 0
Non-Deed Restricted 15
Deed Restricted 1
Non-Deed Restricted 14
83 176
ANNUAL ELEMENT PROGRESS REPORT
Local Early Action Planning (LEAP) Reporting
(CCR Title 25 §6202)
Please update the status of the proposed uses listed in the entity’s application for funding and the corresponding impact on housing within the region or jurisdiction, as applicable, categorized based on the eligible uses specified in Section 50515.02 or 50515.03, as applicable.
-$
Task Status
Total Units
Certificate of Occupancy Issued by Affordability Summary Income Level
Very Low
Low
Moderate
Above Moderate
Moderate
Above Moderate
Total Units
Completed Entitlement Issued by Affordability Summary
Income Level
Very Low
Low
Moderate
Above Moderate
Total Units
Building Permits Issued by Affordability Summary
Income Level
Very Low
Low
Exhibit 1