Attachment 2
LL/4/PWK
979-03-25-25Att2 Page 1 of 8
ACTIVE CIP PROJECTS WITH ACTIVE TRANSPORTATION IMPROVEMENTS
Project Title (CIP No.) Bike/Pedestrian Element Status Anticipated Construction Timeline
Comments
East Whisman Area Transit-Oriented
Development Improvements,
Phase II:
Ellis Street Improvements (16-48)
• Pavement resurfacing.
• High visibility crosswalk and
shortened crosswalks.
• Multi-use path on the west
side of Ellis Street between
Fairchild Drive and Manila
Avenue.
Design Begin: Summer 2025
Complete: Spring 2026
Scope adjustment due
to Google project
rescheduling. CPUC and
Caltrans permits
required
Shoreline Boulevard Bus Lane and
Utility Improvements
(16-58 and 18-43)
• Pavement resurfacing.
• New Class IV protected bike
lanes.
• New sidewalk.
• Protected intersections at
Middlefield Road, Terra Bella
Avenue, and Pear Avenue.
• Water and wastewater main
replacements.
• Five traffic signal
replacements.
Design Phase 1
Begin: July 2025
Complete: Summer
2026
Charleston Road Improvements
(16-59 and 19-34)
• Pavement resurfacing.
• New Class IV protected bike
lanes.
• New sidewalk.
• Protected intersections at
Landings Drive and Alta
Avenue.
Pending staffing
resources
Pending staffing
resources
Design begun and
pending available
Project Manager
LL/4/PWK
979-03-25-25Att2 Page 2 of 8
Project Title (CIP No.) Bike/Pedestrian Element Status Anticipated Construction Timeline
Comments
Shoreline Boulevard at Highway 101
Bicycle and Pedestrian Bridge
(16-60 and 20-38)
• Two-way cycle track and
walkway bridge between
Terra Bella Avenue and Pear
Avenue over Highway 101.
Pending staffing
resources
Pending staffing
resources
Preliminary study begun
and pending progress of
North Bayshore
development.
Shoreline/Church/Latham
Intersection Signal Improvements
(17-27, 19-27, 20-27 and 21-27)
• Protected left-turn phases to
eliminate vehicles/pedestrian
conflicts.
• Reconstruct median for more
available crosswalk area.
Construction Begin: Summer 2024
Complete: Summer
2025
Partially funded with
Vehicle License Fee—
2010 Measure B funds.
Rengstorff Avenue Grade Separation
(17-37, 22-27)
• Pavement reconstruction.
• Class IV bike lanes on
Rengstorff Avenue between
Stanford Avenue and Central
Expressway.
• ADA compliant sidewalk and
pathway.
• Bike/pedestrian overcrossing
between Rengstorff Park and
west side of Rengstorff
Avenue.
• High visibility crosswalks.
Design Begin: 2027
(pending funding
availability)
Complete: 2029
Measure B funded.
Construction phase not
fully funded.
Stierlin Road Bicycle and Pedestrian
Improvements (17-41)
• Protected intersection.
• Buffered bike lane.
• High visibility crosswalks.
• Midblock pedestrian crossing.
• Improved lighting, traffic
calming.
Design Begin: Fall 2025
Complete: Summer
2026
Funded by Federal
grant.
Includes Shoreline
Boulevard between
Montecito Avenue and
West Middlefield Road.
Design complete.
Pending Federal funding
authorization to
proceed.
LL/4/PWK
979-03-25-25Att2 Page 3 of 8
Project Title (CIP No.) Bike/Pedestrian Element Status Anticipated Construction Timeline
Comments
Rengstorff/Latham Signal
Improvements (18-27 and 22-15)
• Protected left turn phases to
eliminate vehicles/pedestrian
conflicts.
• High-visibility crosswalks.
• Bike enhancements include
green bike boxes approaching
along Rengstorff Avenue and
a bike crossing at the
intersection along the west
side of Rengstorff Avenue.
Construction Begin: Summer 2024
Complete: Summer
2025
Partially funded with
Vehicle License Fee—
2010 Measure B funds.
Stevens Creek Trail Extension (18-39,
20-50)
• Trail extension from
Dale/Heatherstone to
Remington.
Feasibility Study Begin Study: 2025
Complete Study: End of
2026
RFP for Preliminary
Design to be issued in
Spring 2025. Partially
funded through
Measure B Grant and
cost-sharing local match
with City of Sunnyvale.
Transit Center Grade Separation and
Access Project (18-65 and 21-35)
• Bike/ped undercrossings
between north side of Central
Expressway and Transit
Center and downtown (on
hold).
• Interim Improvements: at
grade bike/pedestrian
crossing at railroad tracks and
bikeways on Evelyn Avenue.
Design Begin: 2026
Complete: 2027
Measure B funded.
Bernardo Avenue Undercrossing
Feasibility Study (18-69)
• Bike/ped undercrossing of
Caltrain rail and Central
Expressway.
• Bicycle access improvements
within 500’ of approaches.
Preliminary Design
and Environmental
Begin Preliminary
Design: 2018
Complete Preliminary
Design: Fall 2025
Measure B funded.
Caltrain is project lead
for design and
construction.
Collaboration between
Mountain View,
Sunnyvale, VTA, Caltrain,
and County.
Street Reconstruction (19-48) • Pavement reconstruction. • New sidewalk and curb
ramps.
Construction Complete: Spring 2025 Park Drive and
SoniaWay, 300’ of Sewer
Rehab added to scope.
LL/4/PWK
979-03-25-25Att2 Page 4 of 8
Project Title (CIP No.) Bike/Pedestrian Element Status Anticipated Construction Timeline
Comments
Cross-Culvert Removal (19-49) • Removal of existing cross- culverts.
• High visibility crosswalks.
• ADA-compliant curb ramps.
Design Begin: Early 2026
Complete: Fall 2026
Dana Street between
Oak Street and Franklin
Street
El Monte Corridor Improvements
(21-38)
• El Monte Avenue/Escuela
Avenue/ECR Protected
Intersection.
• Road Diet.
• New and enhanced
crosswalks with lighting,
striping, and signage.
• Enhanced bike facility.
• ADA-compliant curb ramps.
Design Begin: Spring 2027
Complete: Early 2028
Federally funded
SR 237/Middlefield Road Interchange
Improvements (19-65)
• ADA-compliant curb ramps.
• High-visibility crosswalks.
• Class IV bikeways on
Middlefield Road between
Ferguson Drive and State
Route 237 eastbound on- and
off-ramps.
Preliminary Design Begin: 2028
Complete: 2030
Measure B funded.
Miramonte Avenue Pavement
Improvements (20-01)
• Class II buffered bike lanes on
Miramonte Avenue between
Cuesta Drive and Hans
Avenue.
• Two-way Class IV bike lane on
northbound Miramonte
Avenue between Hans
Avenue and Castro Street.
• Bulb-out and LED-enhanced
crosswalk system at Hans
Avenue.
Design Begin: Summer 2025
Complete: Early 2026
Miramonte Avenue
(Cuesta Drive to Castro
Street).
LL/4/PWK
979-03-25-25Att2 Page 5 of 8
Project Title (CIP No.) Bike/Pedestrian Element Status Anticipated Construction Timeline
Comments
Castro Street Curb Ramps, (20-30) • Replace curb ramps in downtown.
Design Begin: Spring 2025
Complete: Summer
2025
Plymouth Street/Space Park
Realignment (20-40)
• New roadway pavement.
• High visibility crosswalks.
• Two-way bikeway on
Shoreline Boulevard between
Plymouth Street/Space Park
Way and Pear Avenue.
• Class II bikeways on Plymouth
Street between Joaquin Road
and Shoreline Boulevard.
Design (Phase 3) Phase 3 Begin: 2026
Complete: 2027
Construction to proceed
in three phases: (1) tree
removal (completed);
(2) building demolition
(completed); and
(3) street realignment
(design)
Interim Castro Pedestrian Mall
(23-49)
• Phase I: Pavement
resurfacing and decorative
pavement treatment.
• Phase II: Intersection
Improvements (Villa Street,
Dana Street, and California
Street).
Phase I:
Construction
Phase II: Design
Begin Phase I: Fall 2023
Complete Phase I: Fall
2025
Begin Phase II: Spring
2026
Complete Phase II: End
of 2026
Phase II: California
Street intersection is in
design, and construction
is pending funding
El Camino Real Pavement
Resurfacing Bike and Pedestrian
Improvements (20-61 and 22-29)
• Pavement resurfacing.
• Bike lanes.
• Midblock pedestrian
crossings.
• Replace curb ramps.
Construction Complete: Spring 2025 Caltrans project.
LL/4/PWK
979-03-25-25Att2 Page 6 of 8
Project Title (CIP No.) Bike/Pedestrian Element Status Anticipated Construction Timeline
Comments
Bicycle/Pedestrian Improvements
(21-37)
• Reconstruct bicycle and
pedestrian pathway on east
side of Shoreline Boulevard.
• ADA-compliant curb ramps.
• Pathway lighting.
Design Begin: Summer 2025
Complete: Early 2026
$2M grant funding by
One Bay Area Grant
Program. Shoreline
Boulevard from Wright
Avenue to Villa Street.
Grant Road and Sleeper Avenue
Intersection Improvements (21-39)
Grant Road/Sleeper Avenue:
• Installation of a Pedestrian
Hybrid Beacon (PHB).
• High-visibility crosswalk
across the southern leg of
Grant Road with left turn
restriction from Sleeper
Avenue.
• Bike improvement crossing
Grant Road.
• New and enhanced crosswalk
striping and signage. ADA-
compliant curb ramps.
Intersections
• High-visibility crosswalks.
• LED-enhanced signs.
Phase 1:
Construction
Phase 2: Design
Phase 1
Begin: March 2025
Complete: Fall 2025
Construction to proceed
in two phases:
(1) Grant/Sleeper,
Sleeper/Franklin, and
Dale /Heatherstone; and
(2) seven other
intersections.
California Complete Streets (21-40) • Pavement resurfacing (slurry seal).
• Vehicle lane reduction from
four lanes to three lanes.
• Parking-protected bike lanes.
• Bulb-outs, midblock crossings,
protected intersection
treatments, and enhanced
lighting.
Construction Begin: March 2025
Complete: Fall 2025
Showers Drive to
Shoreline Boulevard.
LL/4/PWK
979-03-25-25Att2 Page 7 of 8
Project Title (CIP No.) Bike/Pedestrian Element Status Anticipated Construction Timeline
Comments
Crittenden Lane and North Shoreline
Boulevard Reconstruction (21-41)
• Pavement resurfacing.
• Bike facilities.
• ADA-compliant curb ramps.
• High visibility crosswalks.
Design Begin: Summer 2025
Complete: Spring 2026
Annual Street Maintenance (22-01) • Class IV bikeways between Moffett Boulevard and
Bernardo Avenue.
• Pavement resurfacing.
• High visibility crosswalks.
Design Begin: Spring 2027
Complete: 2028
Middlefield Road
Complete Streets.
Federally funded.
Bidding Concrete Sidewalk/Curb
Repairs (22-02, 23-02)
• Sidewalk and curb repairs. Design Begin: Spring 2025 Complete: Summer
2025
Approximately
84 locations (~11,000 sq.
ft.)
SB1 Streets Project (23-03) • Pavement resurfacing.
• High visibility crosswalks.
Design Begin: Fall 2025
Complete: 2026
Biennial Installation of ADA Curb
Ramps (22-04, 24-04)
• ADA-compliant curb ramps.
• High visibility crosswalks.
Pending staffing
resources
Pending staffing
resources
Terra Bella Avenue Bikeway
Feasibility Study (22-30)
• Assess feasibility of on-street
bikeway.
Study Begin Study: Early 2025
Complete Study: Spring
2026
Stevens Creek Trail Bridge Over
Central Expressway and Evelyn
Avenue Deck Replacement and
Painting (22-35)
• Deck replacement of
bike/pedestrian bridge over
Evelyn Avenue and Central
Expressway.
Pending staffing
resources
Pending staffing
resources
Annual Street Maintenance (23-01,
24-01)
• Street resurfacing.
• High visibility crosswalks.
Design Begin: Spring 2026
Complete: Fall 2026
MTC Mobility Hub Pilot (23-27) • Bike room improvements at the Transit Center.
Design Begin: Fall 2025
Complete: Spring 2026.
Grant funded.
Street Reconstruction (23-31) • Pavement reconstruction. • B ike lanes.
• High-visibility crosswalks.
Study Begin: Fall 2026
Complete: Spring 2027
Miramonte Avenue
(Castro Street to El
Camino Real). Project
currently in Study phase.
SB1 Streets Project (24-03) • Pavement resurfacing.
• Protected Class IV Bikeways
on Moffett Boulevard.
• Close sidewalk gap.
Design Begin: Summer 2026
Complete: Summer
2027
Moffett Boulevard
Complete Streets.
Federally funded.
LL/4/PWK
979-03-25-25Att2 Page 8 of 8
Project Title (CIP No.) Bike/Pedestrian Element Status Anticipated Construction Timeline
Comments
Street Reconstruction (24-28) • Pavement reconstruction. • High visibility crosswalks.
Pending staffing
resources
Pending staffing
resources
Cross-Culvert Removal and Storm
Drain Extension (24-30)
• Removal of cross-culverts.
• New ADA curb ramps.
• High-visibility crosswalks.
Pending staffing
resources
Pending staffing
resources
Annual Street Maintenance (25-01) • Street resurfacing. • High-visibility crosswalks.
Pending staffing
resources
Pending staffing
resources
Concrete Sidewalk/Curb Repairs • Sidewalk and curb repairs. Pending staffing resources
Pending staffing
resources
SB-1 Streets Project (25-03) • Street resurfacing.
• High-visibility crosswalks.
Design Begin: Early 2027
Complete: End of 2027
RFP for consultant
design will be issued
Spring 2025
Biennial Installation of ADA Curb
Ramps (25-04)
• ADA-compliant curb ramps. Pending staffing
resources
Pending staffing
resources
Street Reconstruction (25-28) • Pavement reconstruction. • High visibility crosswalks.
Pending staffing
resources
Pending staffing
resources
Active Transportation Improvements
(25-29)
• Middlefield Bikeway
Concepts.
Developing bike lane
treatments and
conducting
community outreach
regarding parking
removal
Begin: Summer 2025
Complete: Spring 2026
To be performed by City
forces
ECR/Castro Protected Intersection
and Castro Bikeway Improvements
(Yosemite/High School) and ECR,
Design (25-30
• Bike lanes.
• High visibility crosswalks.
• Protected intersection.
Design Begin: 2027
Complete: 2028
RFP will be issued Spring
2025
Cross Culvert Removal and Storm
Drain Extension (25-32)
• Removal of cross-culverts.
• New ADA curb ramps.
• High visibility crosswalks.
Pending staffing
resources
Pending staffing
resources
Rengstorff Avenue Complete Streets
Study (25-39)
• Identify feasible active
transportation and green
street improvements.
Pending staffing
resources
Pending staffing
resources