A04.08 ENLARGED GROUND FLOOR ELEVATIONS
A04.09 GROUND FLOOR DETAIL VIEWS
A04.10 GROUND FLOOR DETAIL VIEWS
A04.11 MATERIAL BOARD
A05.01 SITE SECTIONS
A05.02 SITE SECTIONS
A05.10 ILLUSTRATIVE WALL SECTION
A05.11 ILLUSTRATIVE WALL SECTION
A05.12 GROUND FLOOR MATERIALS
A08.01 EXTERIOR MATERIALS
A09.01 MATERIALS & SCHEMATIC DETAILS
A09.02 MATERIALS & SCHEMATIC DETAILS
_LANDSCAPE
L1.01 CONCEPTUAL LANDSCAPE PLAN
L1.02 OPEN SPACE LANDSCAPE PLAN
L1.03 OPEN SPACE LANDSCAPE PLAN
L1.11 CONCEPTUAL LANDSCAPE DETAILS
L1.12 CONCEPTUAL LANDSCAPE DETAILS
L2.01 EXISTING TREE CANOPY PLAN
L2.02 FUTURE TREE CANOPY PLAN
L3.01 ALTERNATIVE TRANSPORTATION PLAN
L3.02 ALTERNATIVE TRANSPORTATION PLAN
L4.01 LANDSCAPE SECTIONS
L4.02 LANDSCAPE SECTIONS
L5.01 PLANTING PLAN
L5.02 PLANTING PLAN
L5.03 PLANTING PLAN
L5.04 PLANTING PLAN - LEVEL 6 & 7
L6.01 SCHEMATIC IRRIGATION PLAN
L6.02 SCHEMATIC IRRIGATION PLAN
L6.03 SCHEMATIC IRRIGATION PLAN
L6.04 HYDROZONE PLAN
L6.05 HYDROZONE PLAN
L6.06 HYDROZONE PLAN
CIVIL
C1.01 LOT MERGER EXHIBIT
C2.01 DEMOLITION PLAN
C3.01 CONCEPTUAL GRADING PLAN
C4.01 CONCEPTUAL UTILITY PLAN
ELECTRICAL
E1.00 ELECTRICAL PHOTOMETRY PLAN
E8.00 LIGHTING CUTSHEETS
INFORMATION
I00.01 FIRE & BUILDING CODE PLAN
I00.02 ZONING ORDINANCE CALCULATIONS
I00.04 SOLAR STUDIES
I00.06 EXITING PLANS
I00.07 EXITING PLANS
I00.08 EXITING PLANS
J DRY UTILITY
JT-1 DRY UTILITY PLAN
JT-2 DRY UTILITY PLAN
JT-3 DRY UTILITY PLAN
__GENERAL
G00.00 COVER
G00.10 SITE PHOTOS - EXISTING CONTEXT
G00.20 SITE PHOTOS - EXISTING CONTEXT
L0.00 COLORED MASTER CONTEXT PLAN
L0.01 COLORED CONCEPTUAL LANDSCAPE PLAN
_ARCHITECTURAL
A00.01 SITE PLAN - LEVEL 01
PLANNING SUBMITTAL
365 SAN ANTONIO ROAD, MOUNTAIN VIEW CA 94040
PHASE 3 _FIX IN BLUE BEAM
PHASE III
7RB 09.16.2024
A01.01 CALIFORNIA ST. / SAN ANTONIO ST. CORNER VIEW
A01.02 PROMENADE - SOUTHEAST CORNER
A01.03 PROMENADE - NORTHEAST CORNER
A01.04 CALIFORNIA ST. RETAIL
A01.05 SILICON WAY RENDERINGS
A01.06 RETAIL STREET RENDERINGS
A02.P1 FLOOR PLAN - PARKING P1
A02.P2-P3 FLOOR PLAN - PARKING P2-P3
A02.01 FLOOR PLAN - LEVEL 01
A02.01A FLOOR PLAN - LEVEL 01 (NO SITE)
A02.02 FLOOR PLAN - LEVEL 02
A02.03 FLOOR PLAN - LEVEL 03
A02.04 FLOOR PLAN - LEVEL 04
A02.05 FLOOR PLAN - LEVEL 05
A02.06 FLOOR PLAN - LEVEL 06
A02.07 FLOOR PLAN - LEVEL 07
A02.08 FLOOR PLAN - ROOF
A02.09 ROOF - EQUIPMENT SCHEDULE
A04.01 EXTERIOR ELEVATIONS
A04.02 EXTERIOR ELEVATIONS
A04.03 EXTERIOR ELEVATIONS
A04.04 EXTERIOR ELEVATIONS
A04.05 ENLARGED GROUND FLOOR ELEVATIONS
A04.06 ENLARGED GROUND FLOOR ELEVATION
A04.07 ENLARGED GROUND FLOOR ELEVATIONS
A00.02 OVERALL SITE PLAN - LEVEL 01 PHASE II - LEVEL 01 JT-4 DRY UTILITY PLAN
Attachment 5
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
G00.10
SITE PHOTOS - EXISTING CONTEXT
055.7739.000
SAVN | BLOCK III
BIRDS EYE VIEW
SITE
2 05.05.2021 -planning
submittal 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7 Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
G00.20
SITE PHOTOS - EXISTING CONTEXT
055.7739.000
SAVN | BLOCK III
2 05.05.2021 -planning
submittal 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7
EXISTING
OFFICE & COMMERCIAL BUILDING
NOT TO SCALE
CALIFORNIA STREET
SAN ANTONIO ROAD
SILICON WAY
PROMENADE
LIMIT OF WORK
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax: 619.557.2520
©
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD
MOUNTAIN VIEW, CA 94040
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
09.16.2024 - PLANNING SUBMITTAL 8
OC SD OAK
11300 Sorrento Valley Road, Suite 230
San Diego, CA 92121
858 625 0112
5-31-25
09-16-24
XXXXX
As indicated
20-015
COLORED MASTER CONTEXT PLAN
EXISTING RETAIL
BUILDING
PROMENADE
COMMUNITY
L0.00
BLOCK III
SITE
tion By Check
H FLOOR
04 R
D
040
SAN
R - PHASE 3
ENTER - BLOCK 3
AL 1AL 2
L 3
AL 4AL 5AL 6
L 7
AL 8
C SD OAK
ento Valley Road, Suite 230
n Diego, CA 92121
858 625 0112
AN
RETAIL
OFFICE
PROJECT
SITE EL CAMINO REAL
ALMA STREET
NORTH SAN ANTONIO ROAD
EL CAMINO REAL
ARASTRADERO ROAD
ALTA MESA
MEMORIAL
PARK
NORTH SAN ANTONIO ROAD
EL MONTE AVE CALIFORNIA STREET RENGSTORFF AVENUE WEST MIDDLEFIELD ROAD
ALMA STREET
CHARLESTON
SHOPPING
CENTER
THE VILLAGE
AT SAN
ANTONIO
VICINITY MAP
RETAIL
OFFICE
C1 T4
7 6
UP
RETAIL
STAIR
SERVICE
19'-0"
42'-4"
12'-0"
2830 SF
3 49.90 F.F.E. 730 SF
50.11 F.F.E. 50.11 F.F.E.
24'-9"
65'-1"
24'-8"
T
S
P
B
SILICON WAY
PROMENADE
SAN ANTONIO RD
CALIFORNIA ST
BIKE RACK, PER LANDSCAPE
(E) BIKE LANE TO REMAIN PEDESTRIAN AMENITIES, PER LANDSCAPE
FIRE HYDRANT, PER CIVIL
EXISTING
OFFICE BLDG
EXISTING THEATER
FUTURE
RESIDENTIAL
PROPOSED OFFICE BLDG
(7) STORIES
182,352 TOTAL GSF
169,382 GSF OFFICE
12,970 GSF COMMERCIAL RETAIL
HEIGHT: 101'
TYPE IB
APN 148-22-005, 148-22-006, 148-22-007, 148-22-023
SITE ACREAGE: 99AC / 43,137 SF
1 STORY
ACCESSORY
RETAIL
STRUCTURE
325 GSF
(AREA INCLUDED
IN PRIMARY
STRUCTURE)
"BREEZEWAY"
PROMENADE
EXTENSION
INDOOR/ OUTDOOR
SITTING AREA
OFFICE CAMPUS
CONNECTION
RAMP DOWN TO
SUBTERRANEAN PARKING
AT BLDG 2 FROM PREVIOUS
PHASE
(379 EXCESS STALLS
PROVIDED FOR PROPOSED
PROJECT FROM PHASE II)
250' TO TRANSIT
STOP 70' TO TRANSIT STOP
150' TO TRANSIT
STOP
ACCESSIBLE PATH OF TRAVEL
THEATER
CONNECTION
LOADING
ALIGNMENT
PRIME LEASABLE
RETAIL ALONG MAJOR
PUBLIC STREETS
FIRE HYDRANT, PER CIVIL RIDE- SHARED
PASSENGER
DROP-OFF
L 252.14'
L 282.20'
L 150.00'
L 119.89
L 14.18'
UNDERLYING LOT LINES, TYP.
FIRE BFP,
SEE CIVIL
13' - 0" ROW
1' - 0" PAE
4' - 0"
12' - 10" 132' - 2"
2' - 5"
MPOE
GENERATORS
TRANSFORMERS
RECYCLING &
LOADING
GARAGE
EXHAUST
OFFICE
SUPPORT
FCC
STAIR 2
STAIR 1
5' - 0"
FF=49.85
FF=51.57
FF=49.85
FF=50.22
FF=53.52
FF=53.52
FF=52.59
9,535 GSF
OFFICE LEVEL 1
RETAIL 1
3,000 GSF
RETAIL 2
2,835 GSF
RETAIL 3
3,660 GSF
RETAIL 4
3,150 GSF
LOBBY / LOUNGE
LOADING AREA DOORS TO REMAIN
OPEN DURING BUSSINESS HOURS.
A04.01 2 2 A04.03
A04.02
2 PROPERTY LINE
PEDESTRIAN ACCESS EASEMENT
PUBLIC ACCESS EASEMENT
SETBACK LINE
7'-0" PEDESTRIAN ACCESS EASEMENT
R.O.W. AND PAE
SETBACK LINE
PROPERTY / R.O.W. LINE
SETBACK LINE
PROPERTY LINE
SETBACK LINE
23' - 10" 265' - 4"
A04.08
32 MIN. SETBACK
18' - 0"
FRONTAGE LINE
MIN. FRONTAGE
18' - 0"
FRONTAGE LINE
FRONTAGE LINE
MIN. SETBACK
10' - 0"
FRONTAGE LINE
MIN. SETBACK
10' - 0"
INDOOR/ OUTDOOR
SITTING AREA
ZONING: P(40) - Planned Community / Precise Plan
COMMERCIAL RETAIL CENTER - SUBAREA
PROJECT ADDRESS: 365 SAN ANTONIO ROAD, MOUNTAIN VIEW CA 94040 405 SAN ANTONIO ROAD, MOUNTAIN VIEW CA 94040
2585 CALIFORNIA STREET, MOUNTAIN VIEW CA 94040
2595 CALIFORNIA STREET, MOUNTAIN VIEW CA 94040
EXISITING ZONING: P(40): PLANNED COMMUNITY/PRECISE PLAN GENERAL PLAN DESIGNATION: MIXED-USE CENTER
SPECIAL FLOOD HAZARD ZONE: ZONE X
PROJECT SUMMARY / DESCRIPTION:
MIXED USED BUILDING WITH GROUND LEVEL RETAIL & RESTAURANTS (6) LEVELS OF CLASS "A" OFFICE
(3) LEVELS OF SUBTERRANEAN PARKING
OCCUPANCY: TYPE B, A-2
CONSTRUCTION TYPE: 1-B
BUILDING HEIGHT: 111' TO T.O. MECH SCREEN
PROJECT DESCRIPTION:
THE VILLAGE AT SAN ANTONIO CENTER PHASE III PROPOSES TO COMPLETE THE LAST PHASE OF THE ENTIRE BLOCK DEVELOPMENT, WITH THE CONSTRUCTION OF A MIXED USE BUILDING AT THE INTERSECTION OF CALIFORNIA ST. AND SAN ANTONIO ST. THE PROJECT WOULD TRANSFORM THE PARCEL CURRENTLY OCCUPIED BY (2) SINGLE STORY COMMERCIAL BUILDINGS AND A LARGE AMOUNT OF SURFACE PARKING INTO A (7) STORY MIXED USE BUILDING WITH GROUND FLOOR RETAIL AND (6) LEVELS OF CLASS 'A' OFFICE ABOVE WITH (3) LEVELS OF SUBTERRANEAN PARKING BELOW, THAT CONNECTS TO THE ADJACENT UNDERGROUND PARKING FROM PHASE II.
THE OFFSITE CONDITIONS ARE FULLY IMPROVED, EXISITNG SIDEWALK AT RETAIL SPACE WILL BE IMPROVED.
EXISITNG OFFICE AND RETAIL ARE VACANT.
THE BUILDING'S SINUOUS AND SOFT ARTICULATION IS CREATING A UNIQUE ARCHITECTURAL EXPRESSION FOR THE SITE, REDUCING THE PERCEIVED VISUAL SIZE AND SCALE.
THE GLASS WALL RATIO WILL BE BALANCED IN RESPONSE TO THE ORIENTATION OF EACH ELEVATION TO MINIMIZE THE SOLAR HEAT GAIN AND IT ENERGY CONSUMPTION, THE GENEROUS EXTERIOR DECKS WILL PROVIDE AN INDOOR-OUTDOOR CONNECTION AND ACCESS TO FRESH AIR TO MOST OF THE OCCUPANTS.
ITS MATERIALITY, SUCH AS, C.I.P CONCRETE, LIMESTONE CLADDING WALLS, METAL PANELS, EXPANDED METAL MESH AND, WOOD-LIKE MATERIAL @ BALCONY
SOFFITS AND RETAIL JEWEL BOX, TIES THE BUILDING TO THE SURROUNDINGS, WHILE THE INVITING PEDESTRIAN INTERVENTIONS PROVIDE HUMAN SCALE AND
CONNECTION TO THE URBAN FABRIC
PROPERTY LINE
BUILDING SETBACK
EASEMENT
ACESSIBLE PATH
BLDG OVERHEAD
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A00.01
SITE PLAN - LEVEL 01
055.7739.000
SAVN | BLOCK III
SCALE: 1" = 20'-0"
SITE PLAN 1
SCALE: 12" = 1'-0"
PROJECT INFOMRATION
0 40 5 10 20
Drawing North
SCALE: 1" = 1'-0"
LINE TYPES
2 05.05.2021 -planning
submittal 4
PHASE 2
TOTAL PARKING REQUIRED 2496 STALLS
TOTAL PARKING PROVIDED 2586 STALLS
DIFFERENCE BETWEEN PARKING REQUIRED + PROPOSED 90 STALLS PHASE 3
TOTAL PARKING REQUIRED 637 STALLS
TOTAL PARKING PROVIDED 280 STALLS
COMBINED
TOTAL PARKING REQUIRED 3133 STALLS
PROPOSED SHARED PARKING REDUCTION 8.5% OF 20% ALLOWED (Per SAPP) (267) STALLS TOTAL PARKING REQUIRED 2866 STALLS
TOTAL PARKING PROVIDED 2866 STALLS
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
06.11.2024 - PLANNING SUBMITTAL 7. REV A
PHASE 3 - RETAIL REQUIRED STALLS:
TYPE AREA/SF PARKING RATIO
RETAIL (EXCL. SERVICES) 12,970SF 5.55/100 72 STALLS
BASED ON 72 STALLS:
ACCESSIBLE ADA STALLS REQ. PER CBC:11B-208.2 3 STALLS
EV STALLS BASED ON CAL GREEN 5.106.5.3.1 13 STALLS
ACCESSIBLE EV ADA STALLS REQ. PER CBC:11B.3.2.1 1 VAN / 1 STD EXISTING PARKING STRUCTURE TO INCOPORATE REQ. RETAIL STALLS - REFER TO A00.02 FOR FULL INFORMATION. PARKING STRUCTURE WILL HAVE 2584 STALLS
280 258488 2864
09.12.2024 - PLANNING SUBMITTAL 7. REV B
8.6% 2864 2864
(269)
1 2 3 4 5 6 7 8 9 10
3.A
3.B
3.D
3.C
3.E
3.G
3.F
3.H
________ 2
A02.01
131' - 6"
10' - 0" 20' - 0" 30' - 0" 30' - 0" 20' - 0" 10' - 0" 11' - 6" 240' - 0"
15' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 0" 1 A05.02
________ 1
A05.02
________
1 A05.01
________
1 A05.01
________
SETBACK
10' - 0"
9,535 GSF
SILICON WAY
PROMENADE
SAN ANTONIO RD
CALIFORNIA ST
49.70 50.00
146' - 2" 3' - 10" 5' - 0"
1 A05.10
________
1 A05.10
________
1 A05.11
________ 1
A05.11
________
LINE OF BUILDING OVERHEAD
LINE OF PARKING GARAGE BELOW
FCC
OFFICE LEVEL 1
RETAIL 1
3,000 GSF
RETAIL 2
2,835 GSF
RETAIL 3
3,660 GSF
RETAIL 4
3,150 GSF
STAIR 1
MEN WOMEN
ELEV.
LOBBY
STAIR 2
MAIN
ELEC.
MPOE
GENERATORS TRANSFORMERS
RECYCLE/
REFUSE/
LOADING
GARAGE
EXHAUST
OFFICE SUPPORT
LOBBY / LOUNGE
1 STORY
ACCESSORY
RETAIL
STRUCTURE
325 GSF
(AREA INCLUDED
IN PRIMARY
STRUCTURE)
53.52 49.85
A04.01 2 2 A04.03
A04.02
2 PROPERTY LINE
PEDESTRIAN ACCESS EASEMENT
PUBLIC ACCESS EASEMENT
SETBACK LINE
7'-0" PEDESTRIAN ACESS EASEMENT
R.O.W. AND PAE
SETBACK LINE
PROPERTY / R.O.W. LINE
PAE
SETBACK LINE
PROPERTY LINE
SETBACK LINE
23' - 4" 235' - 10"
22' - 7"
A04.08
32 M
FRONTAGE LINE
IN. S
E
T
B
A
C
K
18' - 0"
FRONTAGE LINE
MIN. SETBACK
18' - 0"
MIN. S
E
T
B
A
C
K
10' - 0"
FRONTAGE LINE
FRONTAGE LINE
DOOR TO REMAIN OPEN
DURING BUSINESS HOURS
4 - YARD
10"
4 - YARD
10"
4 - YARD
10"
4 - YARD 3' - 9" 4 - YARD
18' - 6" 31' - 6"
PROJECT SUMMARY:
RETAIL / OFFICE BUILDING
LEVEL 01 : 22,504 GSF
LEVEL 02 : 31,000 GSF
LEVEL 03 : 31,000 GSF
LEVEL 04 : 31,000 GSF
LEVEL 05 : 23,240 GSF
LEVEL 06 : 24,700 GSF
LEVEL 07 : 18,908 GSF
TOTAL OFFICE: 169,382 GSF
RETAIL (LEVEL 01): 12,970 GSF
TOTAL PROJECT GSF: 182,352 GSF
CARS PROVIDED UNDER BUILDING:
UG PARKING STRUCTURE
36,450 SF PER FLOOR
3 LEVELS (P1 - P3): 282 CARS
PROPERTY LINE
BUILDING SETBACK
EASEMENT
ACESSIBLE PATH
BLDG OVERHEAD
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A02.01
OVERALL SITE PLAN - PHASE II - LEVEL 01
055.7739.000
SAVN | BLOCK III SCALE: 1/16" = 1'-0"
FLOOR PLAN - LEVEL 01 1 SCALE: 1/8" = 1'-0"ENLARGED LOADING/TRASH ROOM 2 2 05.05.2021 -planning
submittal 4
SCALE: 1" = 1'-0"
LINE TYPES
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
09.12.2024 - PLANNING SUBMITTAL 7. REV B
A00.01 09.12.2024 - PLANNING SUBMITTAL 7. REV B
NO
PARKING V. EV EV
(N) EV ADA PARKING
INCL. SIGNAGE -
REPLACE (E) STALLS
3 (N) ADA STALLS INCL.
SIGNAGE - REPLACE (E)
STALLS
PHASE 3
13 (N) EV
CHARGING STALLS
WALL HUNG UNITS
PHASE 3 - RETAIL REQUIRED STALLS:
TYPE AREA/SF PARKING RATIO
RETAIL (EXCL. SERVICES) 12,970SF 5.55/100 72 STALLS
BASED ON 72 STALLS:
ACCESSIBLE ADA STALLS REQ. PER CBC:11B-208.2 3 STALLS
EV STALLS BASED ON CAL GREEN 5.106.5.3.1 13 STALLS
ACCESSIBLE EV ADA STALLS REQ. PER CBC:11B.3.2.1 1 VAN / 1 STD
EXISTING PARKING STRUCTURE
EXISTING PARKING STRUCTURE - 2586 STALLS
REMOVAL OF 3 STALLS FOR (N) ADA STALLS - 2583 STALLS
OVERALL NEW STALL NUMBER (W/ ADA) - 2584 STALLS
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
A01.01
CALIFORNIA ST. / SAN ANTONIO ST. CORNER VIEW
055.7739.000
SAVN | BLOCK III
KEY PLAN
2 05.05.2021 -planning
submittal 4
10.29.2021 - PLANNING SUBMITTAL 7 10.29.2021 - PLANNING SUBMITTAL 7 Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
A01.02
PROMENADE - SOUTHEAST CORNER
055.7739.000
SAVN | BLOCK III
KEY PLAN
2 05.05.2021 -planning
submittal 4
10.29.2021 - PLANNING SUBMITTAL 7
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
A01.03
PROMENADE - NORTHEAST CORNER
055.7739.000
SAVN | BLOCK III
KEY PLAN
2 05.05.2021 -planning
submittal 4
10.29.2021 - PLANNING SUBMITTAL 7
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
A04.04
055.7739.000
SAVN | BLOCK III
KEY PLAN
10.29.2021 - PLANNING SUBMITTAL 7
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
A01.04
CALIFORNIA ST. RETAIL
055.7739.000
SAVN | BLOCK III
KEY PLAN
KEY PLAN
2 05.05.2021 -planning
submittal 4
A01.05 10.29.2021 - PLANNING SUBMITTAL 7
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
A01.06
RETAIL STREET RENDERINGS
055.7739.000
SAVN | BLOCK III
KEY PLAN
KEY PLAN
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
SILICON WAY RENDERINGS
055.7739.000
SAVN | BLOCK III
KEY PLAN
A01.06A
10.29.2021 - PLANNING SUBMITTAL 7
1 2 3 4 5 6 7 8 9 10
3A
3B
3D
3E
3F
3H
3G
3C
15'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 15'-0" 240'-0"
3 0'-0" 3
0'-0" 3
0'-0" 3
0'-0" 14'-0"
13 4'-0"
2 4'-0"
24'-0"
2 4'-0" 18'-0" 18'-0" 18'-0" 18'-0"
18'-0" 18'-0" 18'-0"
9'-0"
3'-0"
2 8'-6"
24'-0"
24'-0"
16'-6"
10'-6"
33'-9"
VEHICULAR
ENTRY/EXIT FROM
EXISTING GARAGE
2 15
UTILITY
20 12
18 2
PARKING
LEVEL P2 -P3
36,450 GSF
STALLS
EXISTING KNOCK-OUT PANEL
15 DRIVE AISLE,
TYP.
D
RIV
E
AISLE,
T
Y
P.
D
RIV
E
AISLE,
T
Y
P.
DRIVE AISLE,
TYP.
DRIVE AISLE,
TYP.
EXISTING PARKING
LEVEL P2 -P4
94 STALLS EXCESS
RESERVED FOR NEW
PROPOSED BUILDING
EXISTING
RAMP
STAIR 1
DAS
ELEC STAIR 2
ELEV.
LOBBY
1 A05.02
________ 1
A05.02
________
1 A05.01
________
1 A05.01
________
15 PROPERTY LINE
PROPERTY LINE
PROPERTY LINE PROPERTY LINE
T
Y
P. S
T
RIP
E
S
P
A
CIN
G
1' - 0"
T
Y
P.S
T
RIP
E
WID
T
H
4"
T
Y
P. S
TALL WID
T
H
8' - 6" S
TA
N
D
A
R
D, 9' A
D
A
TYP. STALL DEPTH
18' - 0"
2' - 0"
PROVIDE 6" HIGH CONC.
WHEEL STOP WHERE
STALLS ARE ADJ. TO WALL
CARS PROVIDED UNDER BUILDING:
UG PARKING STRUCTURE
36,450 SF PER FLOOR
3 LEVELS (P1 - P3): CARS
CARS PROVIDED UNDER BUILDING:
PER 11B-208.2 201-300 STALLS: 7 OF TOTAL REQUIRED FOR ADA 280 TOTAL STALLS = 7 ADA STALLS REQUIRED
8 ADA STALLS PROVIDED
DRAINAGE FROM THE UNDERGROUND PARKING GARAGE SHALL BE DIRECTED TO THE SANITARY SEWER SYSTEM. THE SANITARY SEWER LATERALS SHALL BE EQUIPPED WITH BACKWATER DEVICES. ALL RAMPS ARE LOCATED IN THE
EXISTING PORTION OF THE UNDERGROUND PARKING STRUCTURE AND ALL
REQUIRED DRAINAGE HAS BEEN PROVIDED
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A02.P2-P3
FLOOR PLAN - PARKING P2-P3
055.7739.000
SCALE: 1/16" = 1'-0" SAVN | BLOCK III
FLOOR PLAN - LEVEL P2-P3 1 SCALE: 1/4" = 1'-0"TYP. STALL STRIPING DETAIL 2 05.05.2021 -planning
submittal 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6 280 95 10.29.2021 - PLANNING SUBMITTAL 7 13
09.12.2024 - PLANNING SUBMITTAL 7. REV B
1 2 3 4 5 6 7 8 9 10
3A
3B
3D
3E
3F
3H
3G
3C
24'-0"
24'-0"
24'-0"
24'-0"
15'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 15'-0" 240'-0"
30'-0" 30'-0" 30'-0" 30'-0" 13'-6"
133'-6"
18'-0" 18'-0"
18'-0" 18'-0"
18'-0"
9'-0"
16'-6"
10'-6"
33'-9"
24'-0"
9'-0" 9'-0" 9'-0"
VEHICULAR
ENTRY/EXIT FROM
EXISTING GARAGE
STAIR 1 STAIR 2
ELEV.
LOBBY
20 11
12 18
2 15
PARKING
LEVEL P1
36,450 GSF
90 STALLS
DAS
ELEC
EXISTING KNOCK-OUT PANEL
JAN
VAN VAN
UTILITY
LOCKERS
SHOWER SHOWER
DRIVE AISLE,
TYP.
DRIVE AISLE,
TYP.
DRIVE AISLE,
TYP.
DRIVE AISLE,
TYP.
11 DRIVE AISLE,
TYP.
EXISTING PARKING
LEVEL P2 -P4
97 STALLS EXCESS
RESERVED FOR NEW
PROPOSED BUILDING
EXISTING
RAMP
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
EVSE EVSE
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
EVSE EVSE EVSE EVSE EVSE EVSE EVSE EVSE EVSE EVSE EVSE EVSE EVSE EVSE EVSE
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
CLEAN AIR /
VANPOOL / EV
1 A05.02
________ 1
A05.02
________
1 A05.01
________
1 A05.01
________
BIKE STORAGE
(28)
________ 2
A02.P1
3' - 10"
1 A05.10
________
1 A05.10
________
1 A05.11
________ 1
A05.11
________
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE PROPERTY LINE
T
Y
P. S
T
RIP
E
S
P
A
CIN
G
1' - 0"
T
Y
P.S
T
RIP
E
WID
T
H
4"
T
Y
P. S
TALL WID
T
H
8' - 6" S
TA
N
D
A
R
D, 9' A
D
A
TYP. STALL DEPTH
18' - 0"
2' - 0"
PROVIDE 6" HIGH CONC.
WHEEL STOP WHERE
STALLS ARE ADJ. TO WALL
CARS PROVIDED UNDER BUILDING:
UG PARKING STRUCTURE
36,450 SF PER FLOOR
3 LEVELS (P1 - P3):
CARS PROVIDED UNDER BUILDING:
PER 11B-208.2 201-300 STALLS: 7 OF TOTAL REQUIRED FOR ADA 280 TOTAL STALLS = 7 ADA STALLS REQUIRED
8 ADA STALLS PROVIDED
DRAINAGE FROM THE UNDERGROUND PARKING GARAGE SHALL BE DIRECTED TO THE SANITARY SEWER SYSTEM. THE SANITARY SEWER LATERALS SHALL BE EQUIPPED WITH BACKWATER DEVICES. ALL RAMPS ARE LOCATED IN THE
EXISTING PORTION OF THE UNDERGROUND PARKING STRUCTURE AND ALL
REQUIRED DRAINAGE HAS BEEN PROVIDED
5 3.E
BIKE STORAGE
( )
CLASS 1 BICYCLE PARKING PER BICYCLE
TECHNICAL GUIDE CHAPTER 10
3' - 0" 3' - 0" 3' - 0" 4' - 4" 3' - 0" 3' - 0" 3' - 0" Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A02.P1
FLOOR PLAN - PARKING P1
055.7739.000
SCALE: 1/16" = 1'-0" SAVN | BLOCK III
FLOOR PLAN - LEVEL P1 1 SCALE: 1/4" = 1'-0"TYP. STALL STRIPING DETAIL SCALE: 1/4" = 1'-0"
LONG-TERM BIKE STORAGE 2
2 05.05.2021 -planning
submittal 4
ˆ˝3/$11,1*68%0,77$/˘
˝ˆ3/$11,1*68%0,77$/ˇ
30 280
10.29.2021 - PLANNING SUBMITTAL 7
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7 12 09.12.2024 - PLANNING SUBMITTAL 7. REV B
1 2 3 4 5 6 7 8 9 10
3.A
3.B
3.D
3.C
3.E
3.G
3.F
3.H
________ 2
A02.01
131' - 6"
10' - 0" 20' - 0" 30' - 0" 30' - 0" 20' - 0" 10' - 0" 11' - 6" 240' - 0"
15' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 0" 1 A05.02
________ 1
A05.02
________
1 A05.01
________
1 A05.01
________
SETBACK
10' - 0"
9,535 GSF
SILICON WAY
PROMENADE
SAN ANTONIO RD
CALIFORNIA ST
49.70 50.00
146' - 2" 3' - 10" 5' - 0"
1 A05.10
________
1 A05.10
________
1 A05.11
________ 1
A05.11
________
LINE OF BUILDING OVERHEAD
LINE OF PARKING GARAGE BELOW
FCC
OFFICE LEVEL 1
RETAIL 1
3,000 GSF
RETAIL 2
2,835 GSF
RETAIL 3
3,660 GSF
RETAIL 4
3,150 GSF
STAIR 1
MEN WOMEN
ELEV.
LOBBY
STAIR 2
MAIN
ELEC.
MPOE
GENERATORS TRANSFORMERS
RECYCLE/
REFUSE/
LOADING
GARAGE
EXHAUST
OFFICE SUPPORT
LOBBY / LOUNGE
1 STORY
ACCESSORY
RETAIL
STRUCTURE
325 GSF
(AREA INCLUDED
IN PRIMARY
STRUCTURE)
53.52 49.85
A04.01 2 2 A04.03
A04.02
2 PROPERTY LINE
PEDESTRIAN ACCESS EASEMENT
PUBLIC ACCESS EASEMENT
SETBACK LINE
7'-0" PEDESTRIAN ACESS EASEMENT
R.O.W. AND PAE
SETBACK LINE
PROPERTY / R.O.W. LINE
PAE
SETBACK LINE
PROPERTY LINE
SETBACK LINE
23' - 4" 235' - 10"
22' - 7"
A04.08
32 M
FRONTAGE LINE
IN. S
E
T
B
A
C
K
18' - 0"
FRONTAGE LINE
MIN. SETBACK
18' - 0"
MIN. S
E
T
B
A
C
K
10' - 0"
FRONTAGE LINE
FRONTAGE LINE
DOOR TO REMAIN OPEN
DURING BUSINESS HOURS
4 - YARD
10"
4 - YARD
10"
4 - YARD
10"
4 - YARD 3' - 9" 4 - YARD
18' - 6" 31' - 6"
PROJECT SUMMARY:
RETAIL / OFFICE BUILDING
LEVEL 01 : 22,504 GSF
LEVEL 02 : 31,000 GSF
LEVEL 03 : 31,000 GSF
LEVEL 04 : 31,000 GSF
LEVEL 05 : 23,240 GSF
LEVEL 06 : 24,700 GSF
LEVEL 07 : 18,908 GSF
TOTAL OFFICE: 169,382 GSF
RETAIL (LEVEL 01): 12,970 GSF
TOTAL PROJECT GSF: 182,352 GSF
CARS PROVIDED UNDER BUILDING:
UG PARKING STRUCTURE
36,450 SF PER FLOOR
3 LEVELS (P1 - P3): 280 CARS
PROPERTY LINE
BUILDING SETBACK
EASEMENT
ACESSIBLE PATH
BLDG OVERHEAD
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A02.01
FLOOR PLAN - LEVEL 01
055.7739.000
SAVN | BLOCK III SCALE: 1/16" = 1'-0"
FLOOR PLAN - LEVEL 01 1 SCALE: 1/8" = 1'-0"ENLARGED LOADING/TRASH ROOM SCALE: 1" = 1'-0" 2
LINE TYPES
2 05.05.2021 -planning
submittal 4
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
06.11.2024 - PLANNING SUBMITTAL 7. REV A 09.12.2024 - PLANNING SUBMITTAL 7. REV B 1 2 3 4 5 6 7 8 9 10
3.A
3.B
3.D
3.C
3.E
3.G
3.F
3.H
1 A05.02
________ 1
A05.02
________
1 A05.01
________
1 A05.01
________
1 A05.10
________
1 A05.11
________ 1
A05.11
________
131' - 6"
10' - 0" 20' - 0" 30' - 0" 30' - 0" 20' - 0" 10' - 0" 11' - 6" 240' - 0"
15' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 0"
SETBACK
10' - 0"
LINE OF BUILDING OVERHEAD
LINE OF PARKING GARAGE BELOW
PROPERTY LINE
SETBACK LINE
7'-0" PEDESTRIAN ACCESS EASEMENT
SETBACK LINE
SETBACK LINE
PROPERTY LINE
SETBACK LINE
MIN. S
E
T
B
A
C
K
18' - 0"
MIN. SETBACK
18' - 0"
MIN. S
E
T
B
A
C
K
10' - 0"
FRONTAGE LINE
FRONTAGE LINE
FRONTAGE LINE
11' - 0" 13' - 4" 199' - 7" 6" 15' - 10" 48' - 10"
1' - 3"
4' - 9"
2' - 10"
8' - 7" 116' - 0" 14' - 0"
3' - 10"
5' - 0"
5' - 0"
3' - 6"
45' - 10" 59' - 4" 41' - 4"
FRONTAGE LINE
PROJECT SUMMARY:
RETAIL / OFFICE BUILDING
LEVEL 01 : 22,504 GSF
LEVEL 02 : 31,000 GSF
LEVEL 03 : 31,000 GSF
LEVEL 04 : 31,000 GSF
LEVEL 05 : 23,240 GSF
LEVEL 06 : 24,700 GSF
LEVEL 07 : 18,908 GSF
TOTAL OFFICE: 169,382 GSF
RETAIL (LEVEL 01): 12,970 GSF
TOTAL PROJECT GSF: 182,352 GSF
CARS PROVIDED UNDER BUILDING:
UG PARKING STRUCTURE
36,450 SF PER FLOOR
3 LEVELS (P1 - P3): 282 CARS
PROPERTY LINE
BUILDING SETBACK
EASEMENT
ACESSIBLE PATH
BLDG OVERHEAD
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A02.01A
FLOOR PLAN - LEVEL 01 (NO SITE)
055.7739.000
SAVN | BLOCK III
SCALE: 1/16" = 1'-0"
FLOOR PLAN - LEVEL 01 Copy 2 1 SCALE: 1" = 1'-0"LINE TYPES 280
06.11.2024 - PLANNING SUBMITTAL 7. REV A
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
1 2 3 4 5 6 7 8 9 10
3.A
3.B
3.D
3.C
3.E
3.G
3.F
3.H
1 A05.02
________ 1
A05.02
________
1 A05.01
________
1 A05.01
________
131' - 6"
10' - 0" 20' - 0" 30' - 0" 30' - 0" 20' - 0" 10' - 0" 11' - 6" 15' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 0" 240' - 0"
OFFICE LEVEL 02
31,000 GSF
1 A05.10
________
1 A05.10
________
1 A05.11
________ 1
A05.11
________
181' - 8"
IDF
JAN
STAIR 1 MEN WOMEN
ELEV.
LOBBY
STAIR 2
ELEC.
PROPERTY LINE
10' - 0" 4' - 7" 131' - 5" 9' - 0"
SET BACK
PROPERTY LINE
SETBACK
PROPERTY LINE
SET BACK
PROPERTY LINE
SETBACK
11' - 0" 247' - 6" 7' - 9" 23' - 0"
FRONTAGE LINE
MIN. SETBACK
18' - 0"
FRONTAGE LINE
FRONTAGE LINE
MIN. S
E
T
B
A
C
K
10' - 0"
FRONTAGE LINE
MIN. SETBACK
10' - 0"
A04.08
32 MIN. S
E
T
B
A
C
K
18' - 0"
PROJECT SUMMARY:
RETAIL / OFFICE BUILDING
LEVEL 01 : 22,504 GSF
LEVEL 02 : 31,000 GSF
LEVEL 03 : 31,000 GSF
LEVEL 04 : 31,000 GSF
LEVEL 05 : 23,240 GSF
LEVEL 06 : 24,700 GSF
LEVEL 07 : 18,908 GSF
TOTAL OFFICE: 169,382 GSF
RETAIL (LEVEL 01): 12,970 GSF
TOTAL PROJECT GSF: 182,352 GSF
CARS PROVIDED UNDER BUILDING:
UG PARKING STRUCTURE
36,450 SF PER FLOOR
3 LEVELS (P1 - P3): 282 CARS
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A02.02
FLOOR PLAN - LEVEL 02
055.7739.000
SAVN | BLOCK III SCALE: 1/16" = 1'-0"
FLOOR PLAN - LEVEL 02 1
2 05.05.2021 -planning
submittal 4
280
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
1 2 3 4 5 6 7 8 9 10
3.A
3.B
3.D
3.C
3.E
3.G
3.F
3.H
1 A05.02
________ 1
A05.02
________
1 A05.01
________
1 A05.01
________
131' - 6"
10' - 0" 20' - 0" 30' - 0" 30' - 0" 20' - 0" 10' - 0" 11' - 6" 15' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 0" 240' - 0"
OFFICE LEVEL 03
31,000 GSF
1 A05.10
________
1 A05.10
________
1 A05.11
________ 1
A05.11
________
IDF
JAN
STAIR 1 MEN WOMEN
ELEV.
LOBBY
STAIR 2
ELEC.
10' - 0"
4' - 7"
131' - 5"
1' - 4"
7' - 9"
PROPERTY LINE
SET BACK
PROPERTY LINE
SETBACK
PROPERTY LINE
SET BACK
PROPERTY LINE
SETBACK
11' - 0"
3' - 3"
244' - 3" 7' - 9" 23' - 0"
FRONTAGE LINE
FRONTAGE LINE
FRONTAGE LINE
FRONTAGE LINE
MIN. S
E
T
B
A
C
K
18' - 0"
MIN. SETBACK
18' - 0"
MIN. S
E
T
B
A
C
K
10' - 0"
MIN. SETBACK
10' - 0"
PROJECT SUMMARY:
RETAIL / OFFICE BUILDING
LEVEL 01 : 22,504 GSF
LEVEL 02 : 31,000 GSF
LEVEL 03 : 31,000 GSF
LEVEL 04 : 31,000 GSF
LEVEL 05 : 23,240 GSF
LEVEL 06 : 24,700 GSF
LEVEL 07 : 18,908 GSF
TOTAL OFFICE: 169,382 GSF
RETAIL (LEVEL 01): 12,970 GSF
TOTAL PROJECT GSF: 182,352 GSF
CARS PROVIDED UNDER BUILDING:
UG PARKING STRUCTURE
36,450 SF PER FLOOR
3 LEVELS (P1 - P3):
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A02.03
FLOOR PLAN - LEVEL 03
055.7739.000
SCALE: 1/16" = 1'-0" SAVN | BLOCK III
FLOOR PLAN - LEVEL 03 1
2 05.05.2021 -planning
submittal 4
ˆ˝3/$11,1*68%0,77$/˘
˝ˆ3/$11,1*68%0,77$/ˇ 280
10.29.2021 - PLANNING SUBMITTAL 7
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
1 2 3 4 5 6 7 8 9 10
3.A
3.B
3.D
3.C
3.E
3.G
3.F
3.H
1 A05.02
________ 1
A05.02
________
1 A05.01
________
1 A05.01
________
131' - 6"
10' - 0" 20' - 0" 30' - 0" 30' - 0" 20' - 0" 10' - 0" 11' - 6" 15' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 0" 240' - 0"
OFFICE LEVEL 04
31,000 GSF
1 A05.10
________
1 A05.10
________
1 A05.11
________ 1
A05.11
________
143' - 11"
IDF
JAN
STAIR 1 MEN WOMEN
ELEV.
LOBBY
STAIR 2
ELEC.
PROPERTY LINE
SET BACK
PROPERTY LINE
SETBACK
PROPERTY LINE
SET BACK
PROPERTY LINE
SETBACK
10' - 0"
4' - 7"
131' - 5"
1' - 4"
7' - 9"
11' - 0"
3' - 3"
244' - 3" 7' - 9" 23' - 0"
FRONTAGE LINE
FRONTAGE LINE
FRONTAGE LINE
FRONTAGE LINE
MIN. S
E
T
B
A
C
K
18' - 0"
MIN. SETBACK
18' - 0"
MIN. S
E
T
B
A
C
K
10' - 0"
MIN. SETBACK
10' - 0"
FRONTAGE LINE
PROJECT SUMMARY:
RETAIL / OFFICE BUILDING
LEVEL 01 : 22,504 GSF
LEVEL 02 : 31,000 GSF
LEVEL 03 : 31,000 GSF
LEVEL 04 : 31,000 GSF
LEVEL 05 : 23,240 GSF
LEVEL 06 : 24,700 GSF
LEVEL 07 : 18,908 GSF
TOTAL OFFICE: 169,382 GSF
RETAIL (LEVEL 01): 12,970 GSF
TOTAL PROJECT GSF: 182,352 GSF
CARS PROVIDED UNDER BUILDING:
UG PARKING STRUCTURE
36,450 SF PER FLOOR
3 LEVELS (P1 - P3):
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A02.04
FLOOR PLAN - LEVEL 04
055.7739.000
SCALE: SAVN | BLOCK III 1/16" = 1'-0"
FLOOR PLAN - LEVEL 04 1
2 05.05.2021 -planning
submittal 4
ˆ˝3/$11,1*68%0,77$/˘
˝ˆ3/$11,1*68%0,77$/ˇ 280
10.29.2021 - PLANNING SUBMITTAL 7
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
13'-6"
1 2 3 4 5 6 7 8 9 10
3.A
3.B
3.D
3.C
3.E
3.G
3.F
3.H
1 A05.02
________ 1
A05.02
________
1 A05.01
________
1 A05.01
________
131' - 6"
10' - 0" 20' - 0" 30' - 0" 30' - 0" 20' - 0" 10' - 0" 11' - 6" 15' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 0" 240' - 0"
OFFICE LEVEL 05
23,240 GSF
1 A05.10
________
1 A05.10
________
1 A05.11
________ 1
A05.11
________
ACCESSIBLE PATH OF TRAVEL
275 SF PLANTER
330 SF PLANTER
540 SF PLANTER
370 SF PLANTER
IDF
JAN
STAIR 1 MEN WOMEN
ELEV.
LOBBY
STAIR 2
ELEC.
PLANTER PER LANDSCAPE, TYP.
OVERHEAD CANOPY ABOVE
PROPERTY LINE
SET BACK
PROPERTY LINE
SETBACK
PROPERTY LINE
SET BACK
PROPERTY LINE
SETBACK
10' - 0"
4' - 7"
131' - 5"
1' - 4"
7' - 9"
14' - 3" 244' - 3" 7' - 9" 23' - 0"
FRONTAGE LINE
FRONTAGE LINE
FRONTAGE LINE
FRONTAGE LINE
MIN. S
E
T
B
A
C
K
18' - 0"
10' - 0"
HEIGHT SET BACK
FFE 54'- 9" FROM SITE
LOWEST POINT
MIN. S
E
T
B
A
C
K
10' - 0"
HEIGHT SET BACK
HEIGHT SET BACK
HEIGHT SET BACK
PROJECT SUMMARY:
RETAIL / OFFICE BUILDING
LEVEL 01 : 22,504 GSF
LEVEL 02 : 31,000 GSF
LEVEL 03 : 31,000 GSF
LEVEL 04 : 31,000 GSF
LEVEL 05 : 23,240 GSF
LEVEL 06 : 24,700 GSF
LEVEL 07 : 18,908 GSF
TOTAL OFFICE: 169,382 GSF
RETAIL (LEVEL 01): 12,970 GSF
TOTAL PROJECT GSF: 182,352 GSF
CARS PROVIDED UNDER BUILDING:
UG PARKING STRUCTURE
36,450 SF PER FLOOR
3 LEVELS (P1 - P3):
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A02.05
FLOOR PLAN - LEVEL 05
055.7739.000
SAVN | BLOCK III SCALE: 1/16" = 1'-0"
FLOOR PLAN - LEVEL 05 1
2 05.05.2021 -planning
submittal 4
ˆ˝3/$11,1*68%0,77$/˘
˝ˆ3/$11,1*68%0,77$/ˇ 280
10.29.2021 - PLANNING SUBMITTAL 7
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
1 2 3 4 5 6 7 8 9 10
3.A
3.B
3.D
3.C
3.E
3.G
3.F
3.H
1 A05.02
________ 1
A05.02
________
1 A05.01
________
1 A05.01
________
131' - 6"
10' - 0" 20' - 0" 30' - 0" 30' - 0" 20' - 0" 10' - 0" 11' - 6" 15' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 0" 240' - 0"
1 A05.10
________
1 A05.10
________
1 A05.11
________ 1
A05.11
________
OFFICE LEVEL 06
24,700 GSF
ELEC.
IDF
JAN
STAIR 1 MEN WOMEN
ELEV.
LOBBY
STAIR 2
10' - 5"
PROPERTY LINE
SET BACK
PROPERTY LINE
SETBACK
PROPERTY LINE
SET BACK
PROPERTY LINE
SETBACK
10' - 0" 12' - 1" 120' - 10"
4' - 5"
7' - 9"
16' - 8" 236' - 9" 12' - 10" 23' - 0"
FRONTAGE LINE
FRONTAGE LINE
HEIGHT SET BACK
HEIGHT SET BACK
HEIGHT SET BACK
HEIGHT SET BACK
10' - 0"
MIN. S
E
T
B
A
C
K
18' - 0"
FRONTAGE LINE
FRONTAGE LINE
MIN. S
E
T
B
A
C
K
10' - 0" 10' - 0"
PROJECT SUMMARY:
RETAIL / OFFICE BUILDING
LEVEL 01 : 22,504 GSF
LEVEL 02 : 31,000 GSF
LEVEL 03 : 31,000 GSF
LEVEL 04 : 31,000 GSF
LEVEL 05 : 23,240 GSF
LEVEL 06 : 24,700 GSF
LEVEL 07 : 18,908 GSF
TOTAL OFFICE: 169,382 GSF
RETAIL (LEVEL 01): 12,970 GSF
TOTAL PROJECT GSF: 182,352 GSF
CARS PROVIDED UNDER BUILDING:
UG PARKING STRUCTURE
36,450 SF PER FLOOR
3 LEVELS (P1 - P3):
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A02.06
FLOOR PLAN - LEVEL 06
055.7739.000
SAVN | BLOCK III SCALE: 1/16" = 1'-0"
FLOOR PLAN - LEVEL 06 1
2 05.05.2021 -planning
submittal 4
ˆ˝3/$11,1*68%0,77$/˘
˝ˆ3/$11,1*68%0,77$/ˇ 280
10.29.2021 - PLANNING SUBMITTAL 7
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
7'-1" 13'-9"
1 2 3 4 5 6 7 8 9 10
3.A
3.B
3.D
3.C
3.E
3.G
3.F
3.H
1 A05.02
________ 1
A05.02
________
1 A05.01
________
1 A05.01
________
131' - 6"
10' - 0" 20' - 0" 30' - 0" 30' - 0" 20' - 0" 10' - 0" 11' - 6" 15' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 0" 240' - 0"
ACCESSIBLE PATH OF TRAVEL
OFFICE LEVEL 07
18,908 GSF
1,025 SF PLANTER
630 SF PLANTER
1 A05.10
________
1 A05.10
________
1 A05.11
________ 1
A05.11
________
630 SF PLANTER
ELEC.
IDF
JAN
STAIR 1 MEN WOMEN
ELEV.
LOBBY
STAIR 2
PLANTER PER LANDSCAPE, TYP.
PROPERTY LINE
SET BACK
PROPERTY LINE
SETBACK
PROPERTY LINE
SET BACK
PROPERTY LINE
SETBACK
10' - 0" 12' - 9" 119' - 6"
5' - 1"
7' - 9"
23' - 3" 242' - 11" 23' - 0"
FRONTAGE LINE
FRONTAGE LINE
FRONTAGE LINE
FRONTAGE LINE
HEIGHT SET BACK
HEIGHT SET BACK
HEIGHT SET BACK
HEIGHT SET BACK
10' - 0"
MIN. S
E
T
B
A
C
K
18' - 0"
MIN. SETBACK
10' - 0" 10' - 0"
MIN. S
E
T
B
A
C
K
10' - 0" 10' - 0"
MIN. SETBACK
18' - 0" 10' - 0"
PROJECT SUMMARY:
RETAIL / OFFICE BUILDING
LEVEL 01 : 22,504 GSF
LEVEL 02 : 31,000 GSF
LEVEL 03 : 31,000 GSF
LEVEL 04 : 31,000 GSF
LEVEL 05 : 23,240 GSF
LEVEL 06 : 24,700 GSF
LEVEL 07 : 18,908 GSF
TOTAL OFFICE: 169,382 GSF
RETAIL (LEVEL 01): 12,970 GSF
TOTAL PROJECT GSF: 182,352 GSF
CARS PROVIDED UNDER BUILDING:
UG PARKING STRUCTURE
36,450 SF PER FLOOR
3 LEVELS (P1 - P3):
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A02.07
FLOOR PLAN - LEVEL 07
055.7739.000
SAVN | BLOCK III SCALE: 1/16" = 1'-0"
FLOOR PLAN - LEVEL 07 1
2 05.05.2021 -planning
submittal 4
ˆ˝3/$11,1*68%0,77$/˘
˝ˆ3/$11,1*68%0,77$/ˇ 280
10.29.2021 - PLANNING SUBMITTAL 7
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
139'-0"
1 2 3 4 5 6 7 8 9 10
3.A
3.B
3.D
3.C
3.E
3.G
3.F
3.H
1 A05.02
________ 1
A05.02
________
1 A05.01
________
1 A05.01
________
131' - 6"
10' - 0" 20' - 0" 30' - 0" 30' - 0" 20' - 0" 10' - 0" 11' - 6" 15' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 0" 240' - 0"
ROOF AREA
18,102 SF
1 A05.10
________
1 A05.10
________
1 A05.11
________ 1
A05.11
________
STAIR PRESSURIZATION
F&B EXHAUST
SPLIT CONDENSER UNITS
VRF UNITS
GEN. EXHAUST
AHU
EXHAUST
ACCESS HATCH
STAIR PRESSURIZATION
EL. 94'-11"
EL. 94'-11"
EL. 94'-11"
EL. 94'-11"
EL. 104'-11"
EL. 104'-11"
EL. 104'-11" EL. 104'-11"
10' - 5"
PROPERTY LINE
SET BACK
PROPERTY LINE
SETBACK
PROPERTY LINE
SET BACK
PROPERTY LINE
SETBACK
FRONTAGE LINE
FRONTAGE LINE
FRONTAGE LINE
FRONTAGE LINE
HEIGHT SET BACK
HEIGHT SET BACK
HEIGHT SET BACK
HEIGHT SET BACK
MIN. S
E
T
B
A
C
K
18' - 0" 10' - 0"
MIN. SETBACK
18' - 0"
10' - 0"
MIN. SETBACK
10' - 0" 10' - 0"
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
1/16" = 1'-0"
A02.08
FLOOR PLAN - ROOF
055.7739.000
SCALE: 1/16" = 1'-0" SAVN | BLOCK III
FLOOR PLAN - LEVEL ROOF 1
LINE OF FUTURE PHOTOLVOLTAIC AREA
2 05.05.2021 -planning
submittal 4
ˆ˝3/$11,1*68%0,77$/˘
˝ˆ3/$11,1*68%0,77$/ˇ 10.29.2021 - PLANNING SUBMITTAL 7
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
LEVEL 02
15' - 8"
LEVEL 03
28' - 8"
LEVEL 04
41' - 8"
LEVEL 05
54' - 8"
LEVEL 06
68' - 1"
LEVEL 07
81' - 6"
LEVEL 08
94' - 11"
3.A 3.B 3.C 3.D 3.E 3.F 3.G 3.H
LEVEL P1
-11' - 0"
LEVEL P2
-22' - 0"
LEVEL P3
-33' - 0"
1 A05.02
________
11' - 6" 10' - 0" 20' - 0" 30' - 0" 30' - 0" 20' - 0" 10' - 0" 131' - 6"
BELOW GRADE PARKING
MT-04
GL-01
GL-01
FR-01
GL-02
ST-01
GL-01
MT-02
1 A05.11
________
GL-01
GL-01
MT-05
GL-03
MT-04
MT-05
69' - 0"
12' - 8" 90' - 7"
LEVEL 01
0"
(RETAIL 1 FF=51.75)
PLATE HEIGHT DIM. FROM ADJACENT GRADE
94' - 11"
49.78 TC _SITE LOWEST POINT OVERALL HEIGHT DIM. FROM SITE T.C. LOWEST ELEV. 95' - 0" 10' - 0" OVERALL HEIGHT DIM. FROM SITE T.C. LOWEST ELEV. 105' - 0" ST-01
GL-01
GL-01
CC-01
FR-01
LEVEL 01.2
1' - 11"
RETAIL 2 (49.85)
55' - 0"
13' - 9"
LEVEL 01.2
1' - 11"
.10' - 0"
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A04.01
EXTERIOR ELEVATIONS
055.7739.000
SAVN | BLOCK III
SCALE: 1/16" = 1'-0"
BUILDING ELEVATION - WEST (SAN ANTONIO) 1
SCALE: 1/4" = 1'-0"
RETAIL ELEVATION - WEST 2
2 05.05.2021 -planning
submittal 4
Blackened Metal Panel
Tiger Jet Black Powder
Coating
Glass Type 1
VIRACON VUE24-50
OKO Skin
Glass Type 1
VIRACON VUE24-50
Bifold Door
Expanded Metal Mesh
Signage Per Tenant Bifold Doors
LEVEL 01.1
3"
LEVEL 02
15' - 8"
LEVEL 03
28' - 8"
LEVEL 04
41' - 8"
LEVEL 05
54' - 8"
LEVEL 06
68' - 1"
LEVEL 07
81' - 6"
LEVEL 08
94' - 11"
10 9 8 7 6 5 4 3 2 1
LEVEL P1
-11' - 0"
LEVEL P2
-22' - 0"
LEVEL P3
-33' - 0"
1 A05.01
________
BELOW GRADE PARKING
15' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 0" 240' - 0"
MT-05
GL-01
MT-04
GL-01
MT-05
FR-01
ST-01
GL-01
CC-02
1 A05.10
________
GL-01
CC-01
GL-03
GL-01
MT-05
MT-05
MT-05
109' - 4"
LEVEL 01
0"
GL-02
CC-01
FR-01
GL-01
GL-01
GL-01
OVERALL HEIGHT DIM FROM SITE T.C. LOWEST ELEV.
95' - 0" 10' - 0"
OVERALL HEIGHT DIM. FROM SITE T.C. LOWEST ELEV.
105' - 0"
(RETAIL 2 FF=49.85)
55' - 0"
ST-01
RETAIL 4 (50.09)
15' - 5"
PLATE HEIGHT DIM. FROM ADJACENT GRADE
94' - 11"
49.78_SITE LOWEST T.C. ELEVATION
LEVEL 01.2
1' - 11"
.10' - 6"
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A04.02
EXTERIOR ELEVATIONS
055.7739.000
SAVN | BLOCK III
SCALE: 1/16" = 1'-0"
BUILDING ELEVATION - NORTH (CALIFORNIA) 1
SCALE: 1/4" = 1'-0"
RETAIL ELEVATION - NORTH 2
2 05.05.2021 -planning
submittal 4
Blackened Metal Panel
Tiger Jet Black Powder
Coating
Glass Type 1
VIRACON VUE24-50
OKO Skin
Bifold Door
LEVEL 01.1
3"
LEVEL 02
15' - 8"
LEVEL 03
28' - 8"
LEVEL 04
41' - 8"
LEVEL 05
54' - 8"
LEVEL 06
68' - 1"
LEVEL 07
81' - 6"
LEVEL 08
94' - 11"
3.H 3.G 3.F 3.E 3.D 3.C 3.B 3.A
LEVEL P1
-11' - 0"
LEVEL P2
-22' - 0"
LEVEL P3
-33' - 0"
1 A05.02
________
10' - 0" 20' - 0" 30' - 0" 30' - 0" 20' - 0" 10' - 0" 11' - 6" 131' - 6"
BELOW GRADE PARKING
GL-02
FR-01
MT-04
GL-01
GL-01
ST-01
CC-01
GL-01
GL-01
MT-05
GL-01
MT-05
MT-03
MT-05
ST-01
GL-03
LEVEL 01.3
3' - 8"
MT-05
FR-01
GL-01
GL-01
MT-04
GL-01
49.78 TC _SITE LOWEST POINT OVERALL HEIGHT DIM. FROM SITE T.C. LOWEST ELEV. 95' - 0" 10' - 0" 55' - 0"
PLA
T
E
H
EIG
H
T
DIM. FR
O
M
A
DJA
C
E
N
T
G
RA
D
E
94' - 8"
12' - 0"
(RETAIL 4 FF=50.09)
(LOBBY 53.52)
O
V
E
RALL H
EIG
H
T
DIM. FR
O
M
SIT
E
T.C. LO
W
E
S
T
ELE
V.
105' - 0"
LEVEL 01.2
1' - 11"
.10' - 6"
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A04.03
EXTERIOR ELEVATIONS
055.7739.000
SAVN | BLOCK III
SCALE: 1/16" = 1'-0"
BUILDING ELEVATION - EAST (PROMENADE) 1
SCALE: 1/4" = 1'-0"
RETAIL ELEVATION - EAST 2
2 05.05.2021 -planning
submittal 4
Blackened Metal Panel
Tiger Jet Black Powder
Coating
Glass Type 1
VIRACON VUE24-50
Glass Type 1
VIRACON VUE24-50
Bifold Door
Expanded Metal Mesh
Signage Per Tenant Bifold Doors
LEVEL 01.1
3"
LEVEL 02
15' - 8"
LEVEL 03
28' - 8"
LEVEL 04
41' - 8"
LEVEL 05
54' - 8"
LEVEL 06
68' - 1"
LEVEL 07
81' - 6"
LEVEL 08
94' - 11"
1 2 3 4 5 6 7 8 9 10
LEVEL P1
-11' - 0"
LEVEL P2
-22' - 0"
LEVEL P3
-33' - 0"
1 A05.01
________
BELOW GRADE PARKING
15' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 0" 240' - 0"
GL-01
ST-01
MT-04
CC-01
MT-04
GL-01
GL-02
GL-03
MT-05
ST-01
GL-01
1 A05.10
________
FR-01
MT-05
GL-01
MT-05
GL-01
MT-05
MT-05
LEVEL 01.3
3' - 8"
FR-01
GL-01
49.78 TC _SITE LOWEST POINT
55' - 0"
12' - 0"
PLA
T
E
H
EIG
H
T
DIM. FR
O
M
A
DJA
C
E
N
T
G
RA
D
E
94' - 8"
10' - 0"
O
V
E
RALL H
EIG
H
T
DIM FR
O
M
SIT
E
T.C. LO
W
E
S
T
ELE
V.
95' - 0"
O
V
E
RALL H
EIG
H
T
DIM FR
O
M
SIT
E
T.C. LO
W
E
S
T
ELE
V.
105' - 0"
(RETAIL 4 FF=50.09)
(LOBBY 53.52)
LEVEL 01.2
1' - 11"
.10' - 6"
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A04.04
EXTERIOR ELEVATIONS
055.7739.000
SAVN | BLOCK III
SCALE: 1/16" = 1'-0"
BUILDING ELEVATION - SOUTH (SILICON WAY) 1
SCALE: 1/4" = 1'-0"
RETAIL ELEVATION - SOUTH 2
2 05.05.2021 -planning
submittal 4
Blackened Metal Panel
Tiger Jet Black Powder
Coating
Glass Type 1
VIRACON VUE24-50
Corrugated Metal Panel
Bifold Door
Expanded Metal Mesh
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
06.11.2024 - PLANNING SUBMITTAL 7. REV A
09.12.2024 - PLANNING SUBMITTAL 7. REV B
1' - 6" 13' - 0" 13' - 0" 13' - 0" 1' - 6"
2' - 0" 2' - 0" 4' - 0" 4' - 0" 6' - 0" 4' - 0" 2' - 0" 4' - 0" 4' - 0" 6' - 0" 2' - 0" 2' - 0" 4' - 0" 2' - 0" 2' - 0" 4' - 0" 4' - 0" 6' - 0" 4' - 0" 2' - 0" 2' - 0" 2' - 0" 4' - 0" 4' - 0" 9"
MODULE A
MODULE B
MODULE A
A1 B A B1 A A1 B A
A B1 A A1 B A
A B1 A A1 B A
MODULE B
B A1 A B1
B A1 A B1 A1 B
B A1 A B1 A1 B
MODULE A
MODULE B
1 _ DARK
2 _ MEDIUM
3 _ LIGHTS
13' - 0"
E
Q
E
Q
E
Q
E
Q
EQ EQ
2' - 0"
E
Q
E
Q
E
Q
E
Q
EQ EQ
2' - 0"
13' - 0"13' - 0"
E
Q
E
Q
E
Q
E
Q
1' - 0"
13' - 0"
E
Q
E
Q
E
Q
E
Q
1' - 0"
13' - 0"13' - 0"
A A-1 B B-1
1 1
2 2
2 2
2 2
2 2
3 3
3 3
3 3
3 3
3 3
3 3
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A04.04B
ENLARGED LIMESTONE ELEVATION
055.7739.000
SAVN | BLOCK III
SCALE: 1/4" = 1'-0"
BUILDING ELEVATION - LIMESTONE CLADDING 1
SCALE: 1/2" = 1'-0"
LIMESTONE
10.29.2021 - PLANNING SUBMITTAL 7
3.A 3.B 3.C 3.D
11' - 6" 10' - 0" 20' - 0"
GL-01
GL-02
GL-01
GL-03
GL-01
49.78 TOP OF CURB
MT-04
MT-05
CC-02
ST-01
CC-02
CC-01
RETAIL 2
MT-05
.9' - 0"
3.E 3.F 3.G 3.H
30' - 0" 20' - 0" 10' - 0"
GL GL-01 -02
GL-01
ST-01
GL-01
CC-01
51.52 TOP OF CURB
MT-02
MT-05
MT-05
MT-02
ST-01
MT-03
MT-01
MT-03
RETAIL 1
.9' - 0"
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A04.05
ENLARGED GROUND FLOOR ELEVATIONS
055.7739.000
SAVN | BLOCK III
SCALE: 1/4" = 1'-0"
BUILDING ELEVATION - ENLARGED WEST (NORTH SIDE) 1
SCALE: 1/4" = 1'-0"
BUILDING ELEVATION - ENLARGED WEST (SOUTH SIDE) 2
MATCH LINE
2 A04.05
MATCH LINE
1 A04.05
SCALE: 1/16" = 1'-0"
BUILDING ELEVATION - WEST KEY PLAN 0
MATCH LINE
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
10 9 8 7
15' - 0" 30' - 0" 30' - 0"
CC-01
ST-02
50.33 TOP OF CURB
ST-02
GL-01
ST-02
MT-05
MT-01
RETAIL 4
.9' - 0"
5 4
30' - 0"
MT-05
GL-01
MT-05
MT-05
RETAIL 3
.9' - 0"
3 2 1
30' - 0" 15' - 0"
GL-01
49.78 TOP OF CURB
CC-02
GL-02
GL-01
CC-01
MT-05
GL-03
MT-04
CC-02
RETAIL 2
MT-05
.9' - 0"
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A04.06
ENLARGED GROUND FLOOR ELEVATION
055.7739.000
SAVN | BLOCK III
SCALE: 1/4" = 1'-0"
BUILDING ELEVATION - ENLARGED NORTH (EAST SIDE) 1
SCALE: 1/4" = 1'-0"
BUILDING ELEVATION - ENLARGED NORTH (CENTER) 2
SCALE: 1/4" = 1'-0"
BUILDING ELEVATION - ENLARGED NORTH (WEST SIDE) 3
MATCH LINE
2 A04.06
MATCH LINE
1 A04.06
MATCH LINE
3 A04.06
MATCH LINE
2 A04.06
SCALE: 1/16" = 1'-0"
BUILDING ELEVATION - NORTH KEY PLAN 0
MATCH LINE MATCH LINE
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
3.H 3.G 3.F 3.E
10' - 0" 20' - 0" 30' - 0"
GL-02
GL-01
ST-02
MT-05
ST-01
CC-01
MT-05
52.47 TOP OF CURB
GL-03
MT-04
GL-01
ST-01
GL-01
.9' - 0"
3.D 3.C 3.B 3.A
20' - 0" 10' - 0" 11' - 6"
GL-01
GL-01
ST-02
MT-05
ST-01
CC-01
CC-01
50.33 TOP OF CURB
MT-01
ST-02
GL-01
.9' - 0"
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A04.07
ENLARGED GROUND FLOOR ELEVATIONS
055.7739.000
SAVN | BLOCK III
SCALE: 1/4" = 1'-0"
BUILDING ELEVATION - ENLARGED EAST (NORTH SIDE) 1
SCALE: 1/4" = 1'-0"
BUILDING ELEVATION - ENLARGED EAST (SOUTH SIDE) 2
MATCH LINE
2 A04.07
MATCH LINE
1 A04.07
SCALE: 1/16" = 1'-0"
BUILDING ELEVATION - EAST KEY PLAN 0
MATCH LINE
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
1 2 3 4
15' - 0" 30' - 0" 30' - 0"
MT-02
ST-01
51.52 TOP OF CURB
CC-01
GL-01
MT-05
MT-02
ST-01
MT-05
MT-03
MT-03
MT-01
9' - 0"
RETAIL 1
7 8 9 10
30' - 0" 30' - 0" 15' - 0"
CC-01
ST-01
GL-01
52.47 TOP OF CURB
MT-05
GL-01
GL-02
CC-01
GL-03
MT-05
MT-04
9' - 0"
5 6
30' - 0"
MT-05
GL-01
ST-01
CC-01
ST-01
ST-01
GL-01
MT-05
9' - 0"
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
As indicated
A04.08
ENLARGED GROUND FLOOR ELEVATIONS
055.7739.000
SAVN | BLOCK III
SCALE: 1/4" = 1'-0"
BUILDING ELEVATION - ENLARGED SOUTH (EAST SIDE) 1
SCALE: 1/4" = 1'-0"
BUILDING ELEVATION - ENLARGED SOUTH (WEST SIDE) 3
SCALE: 1/4" = 1'-0"
BUILDING ELEVATION - ENLARGED SOUTH (CENTER) 2
MATCH LINE
2 A04.08
MATCH LINE
1 A04.08
MATCH LINE
3 A04.08
MATCH LINE
2 A04.08
SCALE: 1/16" = 1'-0"
BUILDING ELEVATION - SOUTH KEY PLAN 0
MATCH LINE MATCH LINE
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
06.11.2024 - PLANNING SUBMITTAL 7. REV A
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
A04.09
GROUND FLOOR DETAIL VIEWS
055.7739.000
SAVN | BLOCK III
OFFICE LOBBY DETAILS OFFICE SERVICE DETAILS
RETAIL JEWEL BOX SOUTH DETAILS RETAIL JEWEL BOX NORTH DETAILS KNOTWOOD Iroko Soffit
Blackened Metal Panel
Tiger Jet Black Powder
Coating
Glass Type 1
VIRACON VUE24-50
Hardscape / Planters Per
Landscape
KNOTWOOD Iroko Soffit
Modern Cylindrical Wall
Sconse
Address Signage
Glass Type 1
VIRACON VUE24-50
Hardscape / Planters Per
Landscape
Glass Storefront Doors
HAUSSMANN Natural Stone
Fontainbleau Honed
KNOTWOOD Iroko Soffit
Access Doors
Silver ALuminum Metal Panel
Hardscape / Planters Per
Landscape
KNOTWOOD Iroko Soffit
OKO Skin
Signage Per Tenant
Glass Type 1
VIRACON VUE24-50
Hardscape / Planters Per
Landscape
Glass Type 1
VIRACON VUE24-50
Glass Type 2
VIRACON VNE19-63
Glass Type 3
VIRACON VNE24-63
Garage Roll Up Door
Bifold Door
Expanded Metal Mesh
Signage Per Tenant
Bifold Doors
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
09.12.2024 - PLANNING SUBMITTAL 7. REV B
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
A04.10
GROUND FLOOR DETAIL VIEWS
055.7739.000
SAVN | BLOCK III
RETAIL 4 DETAILS RETAIL 3 DETAILS
RETAIL 2 DETAILS RETAIL 1 DETAILS
HAUSSMANN Natural Stone
Fontainbleau Honed
KNOTWOOD Iroko Soffit
Modern Cylindrical Wall
Sconse
Integrated Linear Lights
Signage Per Tenant
Silver Aluminum Metal Panel
Glass Type 1
VIRACON VUE24-50
Hardscape / Planters Per
Landscape
HAUSSMANN Natural Stone
Saint Louis Honed
KNOTWOOD Iroko Soffit
Modern Cylindrical Wall
Sconse
Signage Per Tenant
Silver Aluminum Metal Panel
Glass Type 1
VIRACON VUE24-50
Hardscape / Planters Per
Landscape
Glass Storefront Doors
Silver Aluminum Metal Panel
CC-02 Oko Skin Concrete
Tile
KNOTWOOD Iroko Soffit
Modern Cylindrical Wall
Sconse
Silver Aluminum Panel
Signage Per Tenant
Glass Type 1
VIRACON VUE24-50
Hardscape / Planters Per
Landscape
Glass Storefront Doors
HAUSSMANN Natural Stone
Saint Louis Honed
KNOTWOOD Iroko Soffit
Signage Per Tenant
Glass Type 1
VIRACON VUE24-50
Hardscape / Planters Per
Landscape
Glass Storefront Doors
AMICO Expanded Metal Mesh
APEX04 Aluminum ANodized
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
A04.11
MATERIAL BOARD
055.7739.000
SAVN | BLOCK III
10.29.2021 - PLANNING SUBMITTAL 7
LEVEL 02
15' - 8"
LEVEL 03
28' - 8"
LEVEL 04
41' - 8"
LEVEL 05
54' - 8"
LEVEL 06
68' - 1"
LEVEL 07
81' - 6"
LEVEL 08
94' - 11"
3.A 3.B 3.C 3.D 3.E 3.F 3.G 3.H
LEVEL P1
-11' - 0"
LEVEL P2
-22' - 0"
LEVEL P3
-33' - 0"
EXISTING OFFICE
BUILDING
SILICON WAY
VEHICULAR
ENTRY/EXIT
FROM EXISTING
GARAGE
FUTURE
RESIDENTIAL
CALIFORNIA ST
AMENITY / PLANTER ZONE
WALK ZONE
PROPRTY/ROW LINE
PAE
PROPRTY/ROW LINE
(P) 1' STREET EASEMENT
SETBACK LINE
6' - 0"3' - 0" 21' - 11"
10' - 0"2' - 11" 17' - 9"
9' - 0" 1' - 0"
45' - 0" 50' - 0"
PUBLIC RIGHT OF WAY
95' - 0"
12' - 7"
3' - 9"
4' - 4" 13' - 11"
OFFICE
OFFICE
COMMERCIAL
RETAIL
PARKING
PARKING
PARKING
11' - 6" 10' - 0" 20' - 0" 30' - 0" 30' - 0" 20' - 0" 10' - 0"
EXISTING KNOCKOUT PANELS,
WHERE OCCURS ON PLAN
15' - 11"
115' - 5"
EXTERIOR ACTIVE ZONE
105' - 0"
(RETAIL 1 FF=51.75)
LEVEL 01
0"
(RETAIL 1 FF=51.75)
18' - 0"
SETBACK
FRONTAGE LINE
49.78 TC _SITE LOWEST POINT 55' - 0" 3' - 3"
HEIGHT SETBACK LINE
SETBACKFRONTAGE LINE
HEIGHT SETBACK LINE
95' - 0" 10' - 0"
10' - 0" 13' - 5" 13' - 5" 13' - 5" 13' - 0" 13' - 0" 13' - 0" 13' - 9" 10' - 0"
OFFICE
OFFICE
OFFICE
OFFICE
SETBACK
PAE
LEVEL 01.2
1' - 11"
RETAIL 2 RETAIL 1
RETAIL 2 (49.85)
15' - 8"
(E) 5' STREET EASEMENT TO REMAIN
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
1" = 20'-0"
A05.01
SITE SECTIONS
055.7739.000
SAVN | BLOCK III
SCALE: 1" = 20'-0"
SITE SECTION 1
1 2 05.05.2021 -planning
submittal 4
10.29.2021 - PLANNING SUBMITTAL 7
LEVEL 02
15' - 8"
LEVEL 03
28' - 8"
LEVEL 04
41' - 8"
LEVEL 05
54' - 8"
LEVEL 06
68' - 1"
LEVEL 07
81' - 6"
LEVEL 08
94' - 11"
1 2 3 4 5 6 7 8 9 10
LEVEL P1
-11' - 0"
LEVEL P2
-22' - 0"
LEVEL P3
-33' - 0"
SAN ANTONIO RD
PROMENADE
EXISTING
THEATER
OFFICE LOBBY
R.O.W.
AMENITY / PLANTER ZONE
WALK ZONEEXTERIOR ACTIVE SPACE
LANDSCAPEWALK ZONE
EXISTING
GAS
STATION
(E) 7'-0" PEDESTRIAN ACCESS EASEMENT
14' PEDESTRIAN ACCESS WITHIN ROW
SETBACK LINE
15' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 0"
PUBLIC RIGHT OF WAY
127' - 0"
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
COMMERCIAL
RETAIL
PARKING
PARKING
PARKING
SETBACK
6' - 0" 12' - 0" 19' - 4"
6' - 0" 9' - 4"
3' - 2"
11' - 1" 22' - 9" 67' - 0" 67' - 0"
4' - 0"
4' - 4"8' - 0" 17' - 0"
LEVEL 01.3
3' - 8"
10' - 0" 13' - 5" 13' - 5" 13' - 5" 13' - 0" 13' - 0" 13' - 0" 12' - 0" (LOBBY FF=53.52)
SETBACKFRONTAGE LINE
PAE
10' - 0" 12' - 9"
49.78 TC _SITE LOWEST POINT
1' - 8" 54' - 6"
18' - 0"
HEIGHT SETBACK LINE
RETAIL 1
HEIGHT SETBACK LINE
PROPRTY/ROW LINE
LEVEL 01.2
1' - 11"
49' - 6"
STREET WIDTH
6' - 7" 65' - 3"
15' - 4"
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
1" = 20'-0"
A05.02
SITE SECTIONS
055.7739.000
SAVN | BLOCK III
SCALE: 1" = 20'-0"
SITE SECTION 2 1
2 05.05.2021 -planning
submittal 4
10.29.2021 - PLANNING SUBMITTAL 7
LEVEL 02
15' - 8"
LEVEL 03
28' - 8"
LEVEL 04
41' - 8"
LEVEL 05
54' - 8"
LEVEL 06
68' - 1"
LEVEL 07
81' - 6"
LEVEL 08
94' - 11"
3.A 3.B 3.C
EXISITING 5'-0" STREET EASEMENT
PUBLIC ACCESS EASEMENT
SETBACK LINE
9" 11' - 2" 14' - 6"
2' - 7"
4' - 1"
1' - 0"
5' - 0"
OFFICE
OFFICE
OFFICE
OFFICE
COMMERCIAL
RETAIL 2
11' - 6" 10' - 0"
6' - 0" 7' - 11" 10' - 5" 6' - 6" PEDESTRIAN ACCESS EASEMENT
EXTERIOR
ACTIVE SPACE
AMENITY /
PLANTER ZONE
TURNING LANE BIKE LANE WALK ZONE
CURB LINE / FRONTAGE LINE
13' - 5" 13' - 5" 13' - 5" 26' - 0" 13' - 0"
LEVEL 01
RETAIL 2 (49.85) 0"
55' - 0"
OFFICE
OFFICE
15' - 8"
49.78 94' - 11"
18' - 0"
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
1/4" = 1'-0"
A05.10
ILLUSTRATIVE WALL SECTION
055.7739.000
SAVN | BLOCK III
SCALE: 1/4" = 1'-0"
SITE SECTION 1 REVISED 1
PLANTER PER LANDSCAPE
2 05.05.2021 -planning
submittal 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7 LEVEL 02
15' - 8"
LEVEL 03
28' - 8"
LEVEL 04
41' - 8"
LEVEL 05
54' - 8"
LEVEL 06
68' - 1"
LEVEL 07
81' - 6"
LEVEL 08
94' - 11"
1 2
3 COMMERCIAL
RETAIL
AMENITY / EXTERIOR ACTIVE SPACE
PLANTER ZONE
TURNING LANE
12' - 0" 5' - 0" 7' - 0" 7' - 0" 4' - 0"
ACTIVE ZONE
5' - 3" 11' - 8"
OFFICE
OFFICE
OFFICE
OFFICE
7'-0" STREET EASEMENT R.O.W. AND 14'-0" PAESETBACK
SAN ANTONIO RD
BIKE LANE WALK ZONE
OFFICE
7' - 0" 4' - 0" 4' - 4" 1' - 11" 6' - 1" 7' - 0" 12' - 11" 15' - 0" 30' - 0"
CURB LINE / FRONTAGE LINE
13' - 5" 13' - 5" 13' - 5" 26' - 0" 13' - 0"
LEVEL 01
0"
18' - 0"
55' - 0"
15' - 8"
OFFICE
HEIGHT SETBACK LINE
10' - 0"
94' - 11"
RETAIL 2 (49.85)
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
1/4" = 1'-0"
A05.11
ILLUSTRATIVE WALL SECTION
055.7739.000
SAVN | BLOCK III
SCALE: 1/4" = 1'-0"
SITE SECTION 2 REVISED 1
2 05.05.2021 -planning
submittal 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
MT
-05
ST-02
WD-01
GL-01
MT-05
MT-05
WD-01
GL-01
WD-01
CC-02
MT-05
GL-01
MT-05
WD-01
MT-02
MT-03
GL-01
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
1" = 20'-0"
A05.12
GROUND FLOOR MATERIALS
055.7739.000
SAVN | BLOCK III
SCALE: 1" = 20'-0"
RETAIL 1
SCALE: 1" = 20'-0"
1 RETAIL 2
2 SCALE: 1" = 20'-0"
RETAIL 3
SCALE: 1" = 20'-0"
3 RETAIL 4
4 07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7 MT-05
GL-01
MT-05
GL-02
CC-01 ST-01
MT-05
WD-01
WD-01
FR-01
GL-01
GL-02
GL-03
MT-04
GL-02
GL-01
WD-01
CC-02
MT-05
GL-01
WD-01
GL-01
MT-02
ST-02
MT-03
Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
1/16" = 1'-0"
A08.01
EXTERIOR MATERIALS
055.7739.000
SAVN | BLOCK III
SCALE: 1/16" = 1'-0"
TILE, GLAZING & METAL
SCALE: 1/16" = 1'-0" 1
CONCRETE, METAL, & WOOD
SCALE: 1/16" = 1'-0" 2
WOOD, METAL, TILE & GLAZING 3
SCALE: 1/16" = 1'-0"
METAL & GLAZING
SCALE: 1/16" = 1'-0" 4
WOOD, METAL, CONCRETE & GLAZING
SCALE: 1/16" = 1'-0" 5
TILE, METAL MESH, GLAZING & WOOD 6
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7
FIRE BACKFLOW PREVENTER
LANDSCAPE PLANTER MOUNDS, SEE NOTE D
AT GRADE PLANTER, SEE DETAIL 11, SHEET L1.12
BUILDING SIGNAGE
UNDERGROUND PARKING LIMIT
TRASH RECEPTACLE MODEL: PD-4953, COLOR TEXTURED BLACK.
AVAILABLE FROM D.M BRAUN, SEE DETAIL 8, SHEET L1.11
CONCRETE SEATWALL WITH METAL BENCH TOP
27" METAL BICYCLE RACK, 2 STALLS PER RACK, RING STAINLESS STEEL BIKE RACK, IMBED MOUNT, AVAILABLE FROM LANDSCAPE FORMS. SEE DETAIL 2, SHEET L1.11
SIGHT TRIANGLE LINES, REFER TO NOTE D ON THIS SHEET FOR
CLARIFICATION - SEE CIVIL PLANS FOR LAYOUT AND DIMENSIONS SITE FURNITURE, REFER TO DETAILS 8-10 SHEET L1.12 & NOTES ON THIS SHEET
SCULPTURAL LANDSCAPE ELEMENT
BENCH, SEE DETAIL 7, SHEET L1.11
FDC 18" TALL SCREENED WITH PLANTING, REFER TO PLANTING SHEET L5.01
6" P.I.P. CONCRETE WALL, SEE DETAIL 13, SHEET L1.12
19 20
21 22
23 24
25 26
27 28
29 30
31 32
SYMBOL DESCRIPTION
REFERENCE NOTES SCHEDULE
UP
DN
3'10' 10.99' 11.01' 6' 12'
12' 4' 10' 67' 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 18" SD
27" SD 27" SD
10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 6" W 8" W 18" SD 18" SD 18" SD 18" SD 18" SD 10" SD 10" SD 10" SD 10" SD 18" SD
8" SD
10" SD 10" SD 10" SD
6" SD
8" SD
10" SD
OH
OH
OH
OH
OH
OH
OH
OH
LIMIT OF WORK
LIMIT OF WORK
PART OF FUTURE OFFSITE PUBLIC
IMPROVEMENT PLANS
PART OF FUTURE OFFSITE PUBLIC
IMPROVEMENT PLANS
4" W
STOP
STOP
8" SD
8" SD
122'-5''
269'-2''
150'
282'-2"
P-101
P-102
P-101
14'-0" 10'-9"
6' 8'
13'-6" 5'-6"
13'-6" 5'-6"
25'-6"
P-102
8'-2" 6'
P-101
P-103
P-103
P-102
P-102
P-102 P-102
6'
MIN.
29'-6"
17'-10"
15'
24'-3"
35'
35'
25'-0"
6'
MIN.
6'
MIN.
6'
MIN.
P-101
P-101
P-102
P-102
P-104
P-103
1 2
3 3
3 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 26
21 13
20 20
14 1
3 20
20 18
28 24
23 29
23 9
27 27
27 12
18 18
19 20
20 20
20 20
20 27
22 25
25 27
27 28 30 6' MIN.
25 14
20 7'-0"
21'-10"
25 P-104
31 32
SYMBOL DESCRIPTION
EXISTING R.O.W. SIDEWALK
EXISTING TRAFFIC LIGHT
EXISTING STREET LIGHT
EXISTING CROSSWALK BUTTON
EXISTING SITE PLANTER
EXISTING MODULAR WETLAND
EXISTING RIGHT OF WAY PLANTER AREA
EXISTING DG TREE WELL TO BE REMOVED
EXISTING CROSSWALK ADA RAMP
EXISTING FIRE HYDRANT
EXISTING UTILITIES
BUILDING COLUMNS
EXISTING METAL TREE GRATE - SEE DETAIL 1, SHEET L1.11
EXISTING PLANTER POT, SEE DETAIL 5, SHEET L1.11
LIGHT FIXTURE/ BANNER POLE, "HW PATINA" POT TOP LIGHT FIXTURE WITH CUSTOM BANNER EXTENSIONS, SEE DETAIL 3, SHEET L1.11
RAMP TO ZERO CURB
ADA RAMP & SIGNAGE, SEE CIVIL PLANS
MODULAR WETLAND VAULT SYSTEM, SEE CIVIL PLANS
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
REFERENCE NOTES SCHEDULE
PAVING
SYMBOL DESCRIPTION MATERIAL FINISH PATTERN COLOR
EXISTING NATURAL GRAY CONCRETE CONCRETE BROOM FINISH
4 X 24 INTERLOCKING PAVER 8 CM DEPTH CONC. PAVER STANDARD FACE MIX SEAL PER SPECS STAGGERED BOND 25% MOCHA, 25% AMARETTO, 25% CARMEL, 25% MAPLE 4 X 24 INTERLOCKING PAVER 8 CM DEPTH CONC. PAVER STANDARD FACE MIX SEAL PER SPECS STACKED BOND MOCHA 4 X 24 INTERLOCKING PAVER 8CM DEPTH CONC. PAVER BURNISHED / FLAT EDGE STACKED BOND CARAMEL P-101
P-102
P-103
P-104
0 20 40
1"=20'-0"SCALE
EXISTING
RETAIL BUILDING
EXISTING
RETAIL BUILDING
EXISTING
OFFICE & COMMERCIAL BUILDING
CALIFORNIA STREET
SAN ANTONIO ROAD
SILICON WAY
PROMENADE
CONSTRUCTION LEGEND
P.A. PLANTING AREA
MWS MODULAR WETLAND SYSTEM
MWS
P.A. P.A. P.A.
P.A.
P.A.
P.A.
P.A.
PAVING SCHEDULE
PROPOSED OFFICE &
COMMERCIAL BUILDING
PARKING CALCULATIONS
TOTAL SHORT-TERM BIKE PARKING - BIKE RACKS
20 TOTAL BIKE LONG-TERM STORAGE
30 TOTAL BIKE PARKING PROVIDED
50 STALLS
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax: 619.557.2520
©
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD
MOUNTAIN VIEW, CA 94040
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
09.16.2024 - PLANNING SUBMITTAL 8
OC SD OAK
11300 Sorrento Valley Road, Suite 230
San Diego, CA 92121
858 625 0112
5-31-25
09-16-24
XXXXX
As indicated
20-015
P.A. P.A. P.A.
L1.01
CONCEPTUAL LANDSCAPE PLAN
P.A. P.A. P.A. P.A.
P.A.
P.A.
P.A.
P.A.
P.A.
P.A. P.A.
28 NOTES:
A. 'OUTDOOR DINING FURNITURE IS SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. FINAL OUTDOOR DINING FURNITURE SHALL BE BY TENANT UNDER SEPARATE PERMIT.'
B. REFER TO SHEET L1.02 FOR SITE AND BUILDING FLOORS OPEN SPACE PLANS AND CALCULATIONS C. FOR ALL SPOT ELEVATIONS AND GRADES SEE CIVIL ENGINEER'S CONCEPTUAL GRADING PLAN SHEET C3.01 D. ALL LANDSCAPE MOUNDS ARE NOT TO EXCEED 3' IN HEIGHT TO ENSURE COMPLIANCE WITH ALL CITY OF MOUNTAIN VIEW SIGHT TRIANGLE AND CPTED GUIDELINES.
27 VISIBILITY AND SAFETY TRIANGLES
MWS MWS
MWS
P.A.
P.A.
P.A. P.A.
PROJECT
SITE
EL CAMINO REAL
ALMA STREET
NORTH SAN ANTONIO ROAD
EL CAMINO REAL
ARASTRADERO ROAD
ALTA MESA
MEMORIAL
PARK
NORTH SAN ANTONIO ROAD
EL MONTE AVE
CALIFORNIA STREET
RENGSTORFF AVENUE
WEST MIDDLEFIELD ROAD
ALMA STREET
CHARLESTON
SHOPPING
CENTER
THE VILLAGE
AT SAN
ANTONIO
VICINITY MAP
36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 12" W 12" W 12" W 12" W 12" W 12" W 12" W 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 12" SD 18" SD 18" SD 18" SD 18" SD 10" SD 10" SD 10" SD 10" SD 18" SD
8" SD
10" SD 4" W 4" W 4" W 4" W
4" W
OH
OH
OH
OH
4" W 8" SD
SILICON WAY PROMENADE
8" SD
STAIR 1
ELEC.
IDF
JAN.
OFFICE
LEVEL 02
31,000 GSF
STAIR 1
ELEC.
IDF
JAN.
OFFICE
LEVEL 03
31,000 GSF
L1.02
OPEN SPACE CALCULATIONS
LEVEL 1 (GROUND LEVEL)
LEVEL 2
LEVEL 3
CALIFORNIA STREET SAN ANTONIO ROAD
SILICON WAY PROMENADE
LEVEL 1 (GROUND LEVEL)
4O4ØL LO4 S):E
17 S&
4O4ØL S4REE4S#Ø0E ØREØ
1 71 S& ( O& 4O4ØL LO4)
4O4ØL "U)LD)NG &OO40R)N4
22 S& (2 O& 4O4ØL LO4)
4O4ØL 0U"L)# O0EN S0Ø#E ØREØ
1
2 S& ( O& 4O4ØL LO4) -
7 S& RE1U)RED (1 O& 4O4ØL LO4)
0U"L)# 0LØN4ED ØREØ
2 2 S& (7 O& 4O4ØL LO4)
4O4ØL USØ"LE 0U"L)# O0EN S0Ø#E
1
7 S& (7 O& 4O4ØL LO4)
LEVELS 2-7
4O4ØL 0R)VØ4E O0EN S0Ø#E ØREØ
1
7 S&
0R)VØ4E 0LØN4ED ØREØ
2 S& (27 O& 4O4ØL 0R)VØ4E O0EN S0Ø#E)
4O4ØL USØ"LE 0R)VØ4E O0EN S0Ø#E ØREØ
11 7 S& 7 O& 4O4ØL 0R)VØ4E O0EN S0Ø#E)
PU%LIC WAL.WAY
PU%LIC SEATING AREA PU%LIC OUTDOOR SEATING
PU%LIC OUTDOOR DINING
AND SEATING
PU%LIC WAL.WAY
PU%LIC WAL.WAY
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax: 619.557.2520
©
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD
MOUNTAIN VIEW, CA 94040
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
09.16.2024 - PLANNING SUBMITTAL 8
OC SD OAK
11 SORRENTO VALLEY ROAD
SUITE 2
SAN DIEGO
#Ø 2121
858 625 0112
-1-2
-1-2
XXXXX
As indicated
20-015
1
2-
2
1
-
OPEN SPACE PLAN
STAIR 1
ELEC.
IDF
JAN.
OFFICE
LEVEL 04
31,000 GSF
PRIVATE
BALCONY
PRIVATE
BALCONY PRIVATE BALCONY
PRIVATE BALCONY
PRIVATE BALCONY
PRIVATE BALCONY
PRIVATE BALCONY
PRIVATE
BALCONY
OFFICE
LEVEL 06
24,700 GSF
STAIR 1
ELEC.
IDF
JAN.
PRIVATE
BALCONY
PRIVATE
BALCONY
PRIVATE BALCONY
PRIVATE BALCONY
PRIVATE BALCONY
PRIVATE BALCONY
PRIVATE
BALCONY
PRIVATE BALCONY
L1.03
OPEN SPACE PLAN
LEVEL 5 LEVEL 4
LEVEL 6
LEVEL 7
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax: 619.557.2520
©
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD
MOUNTAIN VIEW, CA 94040
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
09.16.2024 - PLANNING SUBMITTAL 8
OC SD OAK
11300 Sorrento Valley Road, Suite 230
San Diego, CA 92121
858 625 0112
5-31-25
09-16-24
XXXXX
As indicated
20-015
0 1"=30'-0"
30 60
OPEN SPACE CALCULATIONS
LEVEL 1 (GROUND LEVEL)
TOTAL LOT SIZE
43,137 SF
TOTAL STREETSCAPE AREA
1,971 SF (4% OF TOTAL LOT)
TOTAL BUILDING FOOTPRINT
22,504 SF (52% OF TOTAL LOT)
TOTAL PUBLIC OPEN SPACE AREA
18,662 SF (44% OF TOTAL LOT) - 6,470 SF REQUIRED (15% OF TOTAL LOT)
PUBLIC PLANTED AREA
2,928 SF (7% OF TOTAL LOT)
TOTAL USABLE PUBLIC OPEN SPACE
15,734 SF (37% OF TOTAL LOT)
LEVELS 2-7
TOTAL PRIVATE OPEN SPACE AREA
16,087 SF
PRIVATE PLANTED AREA
4,293 SF (27% OF TOTAL PRIVATE OPEN SPACE)
TOTAL USABLE PRIVATE OPEN SPACE AREA
11,794 SF 73% OF TOTAL PRIVATE OPEN SPACE)
N.T.S 8 TRASH RECEPTACLES* N.T.S 7 PARK BENCH 4 INTERLOCKING PAVERS* 2 5 PRECAST PLANTER POT* 3 N.T.S N.T.S N.T.S 1 N.T.S LIGHT POLE FIXTURE* TYPE 2 BIKE PARKING* N.T.S 225 Broadway Suite 100 San Diego CA 92101 Tel: 619.557.2500 Fax: 619.557.2520 © Seal/Signature Issue Date & Issue Description By Check 425 CALIFORNIA ST. 11TH FLOOR SAN FRANCISCO, CA 94104 CONTACT: DAVID GEISER 415-693-9000 Project Name Project Number Description Scale 365 SAN ANTONIO ROAD MOUNTAIN VIEW, CA 94040 THE VILLAGE AT SAN ANTONIO CENTER - PHASE 3 THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3 02.20.2020 - PLANNING SUBMITTAL 1 07.10.2020 - PLANNING SUBMITTAL 2 10.07.2020 - PLANNING SUBMITTAL 3 05.05.2021 - PLANNING SUBMITTAL 4 07.19.2021 - PLANNING SUBMITTAL 5 09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7 09.16.2024 - PLANNING SUBMITTAL 8 OC SD OAK 11300 Sorrento Valley Road, Suite 230 San Diego, CA 92121 858 625 0112 5-31-25 09-16-24 XXXXX As indicated 20-015 CONCEPTUAL LANDSCAPE DETAILS L1.11 TREE GRATE* NOTE:*MATERIAL FINISHES, AND SITE FURNISHINGS TO MATCH EXISTING ELEMENTS ON THE ADJACENT SAN ANTONIO VILLAGE PROJECT POTS COLOR CHOICES RECEPTACLE COLOR CHOICES 911 DROPPED PLANTER ON PODIUM N.T.S CITY OUTDOOR DINING TABLE* N.T.S N.T.S 8 N.T.S LOUNGE FURNITURE PLANTER SOIL MIX - SEE PLANTING SPECS. - SLOPE SURFACE 2% MIN. TO DRAIN PLANTER INTERIOR FLASHING AT CAP PER PLANS BY ARCHITECT SECURE EDGE PAVER TO BLOCK BELOW WITH MORTAR ADJACENT PAVERS ON STRUCTURE - INSTALL PER DETAIL D, SHEET L1.11 SAND LEVELING BASE AGGREGATE BASE STRUCTURAL FOAM - BY OTHERS WATERPROOFING, DRAIN MAT AND PROTECTION BOARD PER PLANS BY ARCHITECT ROOT BARRIER, INSTALL ALL SIDES OVER PROTECTION BOARD - INSTALL PER MFGRS. RECOMMENDATIONS - SEE PLANTING SPECS. FOR MFGR. DRAIN PIPE AND SURFACE DRAIN PER PLANS BY OTHERS CAST IN PLACE CONCRETE PLANTER WALL - REINFORCEMENT PER STRUCTURAL ENGINEER UPPER DRAIN PER PLANS BY OTHERS GRAVEL PACK AROUND UPPER DRAIN FILTER FABRIC TOPPING SLAB PER STRUCTURAL ENGINEER - SLOPE 1% MIN. TOWARD DRAIN LOWER DRAIN PER PLANS BY OTHERS STRUCTURAL SLAB PER PLANS BY STRUCTURAL ENGINEER 2. REFER TO CIVIL DRAWINGS FOR DRAIN LOCATIONS 123456789101112131415 2 1617 1 NOTES: 1. REFER TO PLUMBING DRAWINGS FOR SPECIFIC DRAIN AND PIPE SPECIFICATIONS 3. ALL REBAR AND REINFORCEMENT PER STRUCTURAL ENGINEER 4. REFER TO CIVIL DRAWINGS FOR ACTUAL FINISH SURFACE ELEVATIONS WHEN SETTING WALL HEIGHTS 811131012951481516317647 10 CITY OUTDOOR COFFEE TABLES 225 Broadway Suite 100 San Diego CA 92101 Tel: 619.557.2500 Fax: 619.557.2520 © Seal/Signature Issue Date & Issue Description By Check 425 CALIFORNIA ST. 11TH FLOOR SAN FRANCISCO, CA 94104 CONTACT: DAVID GEISER 415-693-9000 Project Name Project Number Description Scale 365 SAN ANTONIO ROAD MOUNTAIN VIEW, CA 94040 THE VILLAGE AT SAN ANTONIO CENTER - PHASE 3 THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3 02.20.2020 - PLANNING SUBMITTAL 1 07.10.2020 - PLANNING SUBMITTAL 2 10.07.2020 - PLANNING SUBMITTAL 3 05.05.2021 - PLANNING SUBMITTAL 4 07.19.2021 - PLANNING SUBMITTAL 5 09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7 09.16.2024 - PLANNING SUBMITTAL 8 OC SD OAK 11300 Sorrento Valley Road, Suite 230 San Diego, CA 92121 858 625 0112 5-31-25 09-16-24 XXXXX As indicated 20-015 CONCEPTUAL LANDSCAPE DETAILS L1.12 NOTE:*MATERIAL FINISHES, AND SITE FURNISHINGS TO MATCH EXISTING ELEMENTS ON THE ADJACENT SAN ANTONIO VILLAGE PROJECT 12 METAL AND CONCRETE SEATING LEDGE 1/2" = 1'-0" SECTION ELEVATION METAL BENCH SECTION CONCRETE SEAT LEDGE SECTION 1'-6" 1'-2" 12 2'-6" 60° 100° 0'-9" 3 1
1'-6" 5 5
0'-9" 0'-9"
1'-2" 1'-6"
2'-8" 30" O.C. TYP. 1 CONCRETE SEATLEDGE 23 2.5" EMBEDDED HSS BENCH SUPPORT LEGS 45 ADJACENT PAVING 6 THICKENED CONCRETE SLAB AT SEATING SUPPORT POSTS 7 0'-9" 0'-9" 4 2 1/4" O.C. 1/4" TYP. ENLARGEMENT - METAL SLATS 2 2 METAL BENCH 2X1/4" METAL SLATS SPACED AT 2 1/4" O.C. 4 PLANTING AREA 8 68 SKATE STOPS 910 3"X2" SQUARE HSS FRAME TUBING 11 2.5" ROUND HSS FRAME TUBING 9 CONCRETE SEAT LEDGE REINFORCEMENT AND FOOTING, PER STRUCTURAL ENGINEER 1. CONTRACTOR TO SUBMIT SHOP DRAWINGS PRIOR TO FABRICATION FOR LANDSCAPE ARCHITECT'S AND OWNER REVIEW AND APPROVAL. 2. PAINT ALL METAL MEMBERS PER CONSTRUCTION SPECIFICATIONS, COLOR TO MATCH ARCHITECT'S MULLIONS, FINISH: SATIN NOTES 2345710116 LED TAPELIGHT STRIP CL CL INSTALLATION PHOTO CUSHION COLOR OPTIONS CUSHION COLOR OPTIONS SEATING COLOR OPTIONS 6" P.I.P CONCRETE WALL 1" = 1'-0" 6" NOTES: 1. THE REINFORCEMENT, CONCRETE DEPTH, AND SUBGRADE RECOMMENDATIONS NOTED IN THIS DETAIL ARE MINIMUMS. SHOULD STRUCTURAL SOILS REPORT RECOMMENDATIONS EXCEED THOSE STATED ABOVE, THE STRUCTURAL SOILS REPORT SHALL SUPERSEDE THIS DETAIL. 1'-6" 12 4 5673 PLANTING AREA - REFER TO LANDSCAPE PLAN 1 AMENDED NATIVE SOIL, REFER TO LANDSCAPE SPECIFICATIONS 2 18": P.I.P CONCRETE WALL- NATURAL GRAY W/ SMOOTH CONCRETE FINISH 3 ADJACENT PAVING - REFER TO CONSTRUCTION PLAN 4 CONCRETE REINFORCEMENTS - PLANS BY STRUCTURAL ENGINEER 5 COMPACTED SUB GRADE - PER GEOTECHNICAL RECOMMENDATIONS 6 95% COMPACTED SUBGRADE PER GEOTECHNICAL SOILS REPORT RECOMMENDATIONS 7 13 P-19-010-01-15 LIMIT OF WORK LIMIT OF WORK 0 20 40 1"=20'-0"SCALE EXISTING TREE CANOPY LEGEND TREE # BOTANICAL NAME COMMON NAME TRUNK DIA./ CIR REMARKS 1 FRAXINUS AMERICANA ASH 18.6"/ 58" HERITAGE TREE - TO BE REMOVED, WITHIN NEW PUBLIC SIDEWALK, DISEASE PRESENT 2 ACER RUBRUM 'OCTOBER SKIES' MAPLE 2.6"/ 8" TO BE REMOVED - WITHIN NEW BUILDING FOUNDATION 3 ACER RUBRUM 'OCTOBER SKIES' MAPLE 3.1"/ 10" TO BE REMOVED - WITHIN NEW BUILDING FOUNDATION 4 ACER RUBRUM 'OCTOBER SKIES' MAPLE 3.4"/ 11" PROTECT IN PLACE 5 ACER RUBRUM 'OCTOBER SKIES' MAPLE 0"/ 0" STUMP SPROUTS FROM DAMAGED TREE - PROTECT IN PLACE 6 ACER RUBRUM 'OCTOBER SKIES' MAPLE 5.8"/ 18" TO BE REMOVED - WITHIN NEW BUILDING FOUNDATION 7 PLATANUS X ACERIFOLIA 'COLUMBIA' SYCAMORE 5.9"/ 18" PROTECT IN PLACE 8 PLATANUS X ACERIFOLIA 'COLUMBIA' SYCAMORE 5.1"/ 16" PROTECT IN PLACE 9 PLATANUS X ACERIFOLIA 'COLUMBIA' SYCAMORE 4.4"/ 14" PROTECT IN PLACE 10 PLATANUS X ACERIFOLIA 'COLUMBIA' SYCAMORE 3.7"/ 12" TO BE REMOVED - WITHIN NEW BUILDING FOUNDATION, DISEASE PRESENT 11 LIQUIDAMBAR STYRACIFLUA SWEET GUM 17.5"/ 55" HERITAGE TREE - TO BE REMOVED, WITHIN NEW BUILDING FOUNDATION, ROOT DAMAGE AND POOR OVERALL HEALTH 12 PLATANUS X ACERIFOLIA 'COLUMBIA' SYCAMORE 5.9"/ 19" PROTECT IN PLACE 13 PLATANUS X ACERIFOLIA 'COLUMBIA' SYCAMORE 5.7"/ 18" PROTECT IN PLACE 13A ARBUTUS X 'MARINA' ARBUTUS 1.9"/ 6" TO BE REMOVED - NEW LANDSCAPE FEATURES & UTILITIES TO BE LOCATED IN THIS LOCATIONCALIFORNIA STREET SAN ANTONIO ROAD SILICON WAY TREE # BOTANICAL NAME COMMON NAME TRUNK DIA./ CIR. REMARKS 14 ARBUTUS X 'MARINA' ARBUTUS 2.5"/ 9" PROTECT IN PLACE 15 ARBUTUS X 'MARINA' ARBUTUS 5.1"/ 16" PROTECT IN PLACE 16 JACARANDA MIMOSIFOLIA MIMOSA 10.9", 10.1", 8.4"/ 92" HERITAGE TREE - TO BE REMOVED, WITHIN NEW BUILDING FOOTPRINT 17 JACARANDA MIMOSIFOLIA MIMOSA 10.8", 10.1", 7.9"/ 91" HERITAGE TREE - TO BE REMOVED, WITHIN NEW PEDESTRIAN CONNECTION 18 PLATANUS X ACERIFOLIA SYCAMORE 6.9"/ 22" TO BE REMOVED, WITHIN NEW BUILDING FOOTPRINT 19 PLATANUS X ACERIFOLIA SYCAMORE 19.1"/ 60" HERITAGE TO BE REMOVED, WITHIN NEW BUILDING FOOTPRINT 20 MAGNOLIA GRANDIFLORA 'MAJESTIC BEAUTY' MAGNOLIA 5.0"/ 16" TO BE REMOVED, WITHIN NEW BUILDING FOOTPRINT 21 ARBUTUS X 'MARINA' N.C.N. 3.9"/ 12" TO BE REMOVED, WITHIN NEW BUILDING FOOTPRINT EXISTING OFFICE EXISTING RETAIL EXISTING RETAIL BUILDING EXISTING RETAIL BUILDING EXISTING OFFICE & COMMERCIAL BUILDING
PROMENADE
225 Broadway Suite 100 San Diego CA 92101 Tel: 619.557.2500 Fax: 619.557.2520 © Seal/Signature Issue Date & Issue Description By Check 425 CALIFORNIA ST. 11TH FLOOR SAN FRANCISCO, CA 94104 CONTACT: DAVID GEISER 415-693-9000 Project Name Project Number Description Scale 365 SAN ANTONIO ROAD MOUNTAIN VIEW, CA 94040 THE VILLAGE AT SAN ANTONIO CENTER - PHASE 3 THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3 02.20.2020 - PLANNING SUBMITTAL 1 07.10.2020 - PLANNING SUBMITTAL 2 10.07.2020 - PLANNING SUBMITTAL 3 05.05.2021 - PLANNING SUBMITTAL 4 07.19.2021 - PLANNING SUBMITTAL 5 09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7 09.16.2024 - PLANNING SUBMITTAL 8 OC SD OAK 11300 Sorrento Valley Road, Suite 230 San Diego, CA 92121 858 625 0112 5-31-25 09-16-24 XXXXX As indicated 20-015 1 2 3 5 4 6 789 10 11 1213 1415 16 17 18 19 20 21 EXISTING TREE CANOPY PLAN EXISTING LOT LINE EXISTING LOT LINE NOTE: · HERITAGE TREES ARE NOTED BASED ON CRITERIA GIVEN BY THE CITY OF MOUNTAIN VIEW AS ANY TREE HAVING A TRUNK CIRCUMFERENCE OF 48'' OR GREATER AT 54'' ABOVE GRADE, OR ANY OAK SPECIES HAVING A TRUNK CIRCUMFERENCE OF 12'' OR GREATER AT 54'' ABOVE GRADE 13A L2.01 3'10' 10.99' 11.01' 6' 12' 12' 4' 10' 67'
36" SD
36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD
12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 12" SD
18" SD 27" SD 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 12" SD 12" SD 18" SD
18" SD 18" SD 18" SD 18" SD
10" SD 10" SD 10" SD 10" SD 18" SD 8" SD 4" S
4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W
4" W 4" W 4" W 4" W 4" W 4" W 4" W 10" SD 10" SD 6" SD
4" W
4" W
4" W
4" W
4" W 4" W 4" W 4" W 4" SD
4" S
8" SD 10" SD 4" S
4" W 4" W 4" W
4" SD 4" SD 4" SD
OH
OH
OH
OH OH OH OH OH
LIMIT OF WORK LIMIT OF WORK 4" W STOP
STOP
8" SD
8" SD 12' 3'10' 10.99' 11.01' 6' 12' 12' 4' 10' 67'
36" SD
36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD
12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 12" SD
18" SD 27" SD 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 12" SD 12" SD 18" SD
18" SD 18" SD 18" SD 18" SD
10" SD 10" SD 10" SD 10" SD 18" SD 8" SD 4" S
4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W
4" W 4" W 4" W 4" W 4" W 4" W 4" W 10" SD 10" SD 6" SD
4" W
4" W
4" W
4" W
4" W 4" W 4" W 4" W 4" SD
4" S
8" SD 10" SD 4" S
4" W 4" W 4" W
4" SD 4" SD 4" SD
OH
OH
OH
OH OH OH OH OH
LIMIT OF WORK LIMIT OF WORK 4" W STOP
STOP
8" SD
8" SD 12' 225 Broadway Suite 100 San Diego CA 92101 Tel: 619.557.2500 Fax: 619.557.2520 © Seal/Signature Issue Date & Issue Description By Check 425 CALIFORNIA ST. 11TH FLOOR SAN FRANCISCO, CA 94104 CONTACT: DAVID GEISER 415-693-9000 Project Name Project Number Description Scale 365 SAN ANTONIO ROAD MOUNTAIN VIEW, CA 94040 THE VILLAGE AT SAN ANTONIO CENTER - PHASE 3 THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3 02.20.2020 - PLANNING SUBMITTAL 1 07.10.2020 - PLANNING SUBMITTAL 2 10.07.2020 - PLANNING SUBMITTAL 3 05.05.2021 - PLANNING SUBMITTAL 4 07.19.2021 - PLANNING SUBMITTAL 5 09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7 09.16.2024 - PLANNING SUBMITTAL 8 OC SD OAK 11300 Sorrento Valley Road, Suite 230 San Diego, CA 92121 858 625 0112 5-31-25 09-16-24 XXXXX As indicated 20-015 0 20 40 1"=20'-0"SCALE FUTURE TREE CANOPY TABLE SYMBOL BOTANICAL NAME GROWTH RATE DAY 1 SIZE 5 YEAR SIZE 10 YEAR SIZE MATURE SIZE ACER RUBRUM 'OCTOBER GLORY' (EXISTING) FAST 10'-14' 20'-26' 25'-30' 30'-40' ACER RUBRUM 'OCTOBER GLORY' (PROPOSED) FAST 4-6' 12-15' 22-28' 30-40' ARBUTUS X 'MARINA' SLOW-MODERATE 5-6' 8-10' 18-22' 25-35' MAGNOLIA GRANDIFLORA 'MAJESTIC BEAUTY' MODERATE 6-7' 10-12' 20-24' 20-30' GARRYA ELIPTICA 'EVIE' MODERATE 5-6' 8-9' 12' 15' CERCIS CANADENSIS MODERATE 5-6' 8-9' 12-15' 18-20' PLATANUS X ACERIFOLIA COLUMBIA (EXISTING) FAST 10'-14' 20'-26' 25'-30' 30'-40' NOTE: · TREE GROWTH CANOPY SIZE ESTIMATES ARE BASED ON ADEQUATE CONDITIONS AND CAN VARY DUE TO SOIL NUTRIENT LEVEL, DRAINAGE CONDITIONS, AVAILABLE WATER, MICROCLIMATE, ETC. · EXISTING TREES TO REMAIN ARE CURRENTLY AT THE 5 YEAR SIZE, THEIR PROJECTED GROWTH TO MATURITY HAS BEEN INCLUDED IN THESE CALCULATIONS. TREE CANOPY SITE COVERAGE CONDITION CANOPY COVERAGE (SQ. FT.) PERCENTAGE OF SITE EXISTING PRE-CONDITION 3,303 7.7% DAY ONE 557 1.3% 5 YEAR GROWTH PROJECTION 2,573 6.0% 10 YEAR GROWTH PROJECTION 6,465 15.0% AT TREE MATURITY 11,814 27.4% NOTE: TOTAL LOT SIZE = 43,137 SF TREE CANOPY SYMBOLOGY CALIFORNIA STREET
SAN ANTONIO ROAD SILICON WAY EXISTING OFFICE & COMMERCIAL BUILDING PROMENADE L2.02 FUTURE TREE CANOPY PLAN TREE CANOPY AT MATURITY 10 YEAR TREE CANOPY 5 YEAR TREE CANOPY TREE CANOPY AT INSTALLATION EXISTING TREE CURRENT CANOPY SIZE TO BE PROTECTED IN PLACE GROUND LEVEL SITE PLAN 5 YEAR EXISTING TREE CANOPY 10 YEAR EXISTING TREE CANOPY EXISTING TREE CANOPY AT MATURITY 225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax: 619.557.2520
©
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD
MOUNTAIN VIEW, CA 94040
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
09.16.2024 - PLANNING SUBMITTAL 8
OC SD OAK
11300 Sorrento Valley Road, Suite 230
San Diego, CA 92121
858 625 0112
5-31-25
09-16-24
XXXXX
As indicated
20-015
ALTERNATIVE TRANSPORTATION PLAN
L3.01
SEE PHASE III
ENLARGEMENT PLAN -
PROPOSED
IMPROVEMENTS
SILICON WAY
DISK DRIVE
X X
RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
RESTAURANT LOBBY
LOADING
RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
LOADING
RETAIL
COMMERCIAL
LOBBY
COMMERCIAL
COMMERCIAL
LOADING
RESTAURANT
LOADING
RESTAURANT
RESTAURANT RESTAURANT
LOBBY
RESTAURANT LOBBY
BAR
DINING
RETAIL
KITCHEN / LAUNDRY /
BACK OF HOUSE
RESTAURANT RESTAURANT REST.
RESTAURANT
RESTAURANT
DISK DRIVE
0 30 60 120 180
SCALE: 1" = 60'-0"
SAN ANTONIO ROAD
CALIFORNIA STREET
EL CAMINO REAL
THIS DRAWING EMBODIES IDEAS, DESIGNS, ARRANGEMENTS, PLANS AND SPECIFICATIONS WHICH ARE PROPRIETARY TO DEVCON CONSTRUCTION INC.. AND WHICH WERE DESIGNED, CREATED, EVOLVED AND DEVELOPED FOR USE SOLELY IN CONNECTION WITH THE SPECIFIED PROJECT. NO
TRANSFER OF ANY RIGHTS THERETO IS INTENDED OR EFFECTED BY DELIVERY HEREOF, AND EXCEPT UPON THE WRITTEN PERMISSION OF DEVCON CONSTRUCTION INC.. THE DRAWING IS NOT
TO BE DISCLOSED TO OTHERS, REPRODUCED OR COPIED IN WHOLE OR IN PART, OR USED IN THE
FABRICATION OR CONSTRUCTION OF BUILDINGS, STRUCTURES, FOUNDATIONS, OR ANY PORTIONS
THEREOF, FOR OTHER THAN THE SPECIFIED PROJECT
.
© DEVCON CONSTRUCTION, INC.
GENERAL NOTES:
CONTRACTOR SHALL FIELD VERIFY ALL JOB CONDITIONS AND DIMENSIONS. VARIATIONS THEREOF FROM THE DRAWINGS MUST BE REPORTED TO THE ARCHITECT.
DETAILS INDICATED ON THE DRAWINGS ARE REPRESENTATIVE AND TYPICAL. ALL ATTACHMENTS
AND CONNECTIONS SHALL CONFORM TO BEST PRACTICE AND SHALL BE THE CONTRACTOR'S
RESPONSIBILITY
REVISIONS
NO. DATE DESCRIPTION BY
SHEET NO.
ISSUEOF SHEETS
CHECKED:
DRAWN:
DATE :
JOB NO.
CONSTRUCTION
INCORPORATED
690 Gibraltar Drive
Milpitas, California 95035
(408)942-8200 Lic. #399163
14-018
MOUNTAIN VIEW, CA
THE VILLAGE AT
SAN ANTONIO
CENTER NORTH
SITE
THE VILLAGE AT
SAN ANTONIO
CENTER
NORTH
6/9/14
C S
ALTERNATIVE
TRANSPORTATION PLAN
L3.01
BICYCLE MARKING AT
LOOP DETECTOR IN CENTER LANE
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
BIKE STORAGE FOR SAFE & SECURE STORAGE OF BICYCLES
IN BUILDING GARAGE (CLASS 1 BICYCLE PARKING)
CLASS 1 BICYCLE PARKING
CLASS 2 BICYCLE PARKING
SHOWER FACILITIES
BIKE ORIENTED RETAIL WITH ACCESS TO PUBLIC BIKE
REPAIR FACILITIES
“SLOW DOWN” 15 MPH SPEED LIMIT SIGN
SUPER SHARROW
EXISTING BIKE LANE
FLASHING PEDESTRIAN BOT-DOTS WITH
PUSH BUTTON ACTIVATOR
VALLEY TRANSPORTATION AUTHORITY [VTA] BUS STOP
REDUCED SPEED TABLE WITH ENHANCED PAVING
15SLOW
DOWN
CLASS 1 BIKE STORAGE FOR SAFE & SECURE STORAGE OF
BICYCLES IN BUILDING GARAGE (TYPE I BICYCLE PARKING)
CLASS 2 BICYCLE PARKING
“SLOW DOWN” 15 MPH SPEED LIMIT SIGN
EXISTING BIKE LANE
PEDESTRIAN CIRCULATION
15SLOW
DOWN
BIKE PARKING REQUIRED: 128
BIKE PARKING PROVIDED: 335
10’ DRIVE LANE
WIDTH VARIES
10’ DRIVE LANE
WIDTH VARIES
EAST DRIVE AISLE STRIPING LAYOUT
NTS
CURB
CURB
PAINTED STRIPE (TYP.)
PAINTED STRIPE (TYP.)
BIKE PARKING CALCULATIONS
PHASE I-II
BIKE PARKING REQUIRED = 128
BIKE PARKING PROVIDED = 335
EXCESS BIKE PARKING = 207
EXISTING PHASE I AND II PLAN KEY
PLAN IS NOT TO SCALE
SEE SHEET
L3.02 PHASE III
ENLARGEMENTS
EXISTING ALTERNATIVE TRANSPORTATION IMPROVEMENTS WITHIN PHASE I AND II OF THE VILLAGE AT SAN ANTONIO 225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax: 619.557.2520
©
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD
MOUNTAIN VIEW, CA 94040
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
09.16.2024 - PLANNING SUBMITTAL 8
OC SD OAK
11300 Sorrento Valley Road, Suite 230
San Diego, CA 92121
858 625 0112
5-31-25
09-16-24
XXXXX
As indicated
20-015
ALTERNATIVE TRANSPORTATION PLAN
L3.02
SILICON WAY
DISK DRIVE
X X
RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
RESTAURANT LOBBY
LOADING
RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
LOADING
RETAIL
COMMERCIAL
LOBBY
COMMERCIAL
COMMERCIAL
LOADING
RESTAURANT
LOADING
RESTAURANT
RESTAURANT RESTAURANT
LOBBY
RESTAURANT LOBBY
BAR
DINING
RETAIL
KITCHEN / LAUNDRY /
BACK OF HOUSE
RESTAURANT RESTAURANT REST.
RESTAURANT
RESTAURANT
DISK DRIVE
0 30 60 120 180
SCALE: 1" = 60'-0"
SAN ANTONIO ROAD
CALIFORNIA STREET
EL CAMINO REAL
THIS DRAWING EMBODIES IDEAS, DESIGNS, ARRANGEMENTS, PLANS AND SPECIFICATIONS WHICH ARE PROPRIETARY TO DEVCON CONSTRUCTION INC.. AND WHICH WERE DESIGNED, CREATED, EVOLVED AND DEVELOPED FOR USE SOLELY IN CONNECTION WITH THE SPECIFIED PROJECT. NO
TRANSFER OF ANY RIGHTS THERETO IS INTENDED OR EFFECTED BY DELIVERY HEREOF, AND EXCEPT UPON THE WRITTEN PERMISSION OF DEVCON CONSTRUCTION INC.. THE DRAWING IS NOT
TO BE DISCLOSED TO OTHERS, REPRODUCED OR COPIED IN WHOLE OR IN PART, OR USED IN THE
FABRICATION OR CONSTRUCTION OF BUILDINGS, STRUCTURES, FOUNDATIONS, OR ANY PORTIONS
THEREOF, FOR OTHER THAN THE SPECIFIED PROJECT
.
© DEVCON CONSTRUCTION, INC.
GENERAL NOTES:
CONTRACTOR SHALL FIELD VERIFY ALL JOB CONDITIONS AND DIMENSIONS. VARIATIONS THEREOF FROM THE DRAWINGS MUST BE REPORTED TO THE ARCHITECT.
DETAILS INDICATED ON THE DRAWINGS ARE REPRESENTATIVE AND TYPICAL. ALL ATTACHMENTS
AND CONNECTIONS SHALL CONFORM TO BEST PRACTICE AND SHALL BE THE CONTRACTOR'S
RESPONSIBILITY
REVISIONS
NO. DATE DESCRIPTION BY
SHEET NO.
ISSUE: OF SHEETS
CHECKED:
DRAWN:
DATE :
JOB NO.
CONSTRUCTION
INCORPORATED
690 Gibraltar Drive
Milpitas, California 95035
(408)942-8200 Lic. #399163
14-018
MOUNTAIN VIEW, CA
THE VILLAGE AT
SAN ANTONIO
CENTER
NORTH
6/9/14
EPC SUBMITTAL
ALTERNATIVE
TRANSPORTATION PLAN
L3.01
BICYCLE MARKING AT
LOOP DETECTOR IN CENTER LANE
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
15SLOW
DOWN
BIKE STORAGE FOR SAFE & SECURE STORAGE OF BICYCLES
IN BUILDING GARAGE (CLASS 1 BICYCLE PARKING)
CLASS 1 BICYCLE PARKING
CLASS 2 BICYCLE PARKING
SHOWER FACILITIES
BIKE ORIENTED RETAIL WITH ACCESS TO PUBLIC BIKE
REPAIR FACILITIES
“SLOW DOWN” 15 MPH SPEED LIMIT SIGN
SUPER SHARROW
EXISTING BIKE LANE
FLASHING PEDESTRIAN BOT-DOTS WITH
PUSH BUTTON ACTIVATOR
VALLEY TRANSPORTATION AUTHORITY [VTA] BUS STOP
REDUCED SPEED TABLE WITH ENHANCED PAVING
15SLOW
DOWN
CLASS 1 BIKE STORAGE FOR SAFE & SECURE STORAGE OF
BICYCLES IN BUILDING GARAGE (TYPE I BICYCLE PARKING)
CLASS 2 BICYCLE PARKING
“SLOW DOWN” 15 MPH SPEED LIMIT SIGN
EXISTING BIKE LANE
PEDESTRIAN CIRCULATION
15SLOW
DOWN
BIKE PARKING REQUIRED: 128
BIKE PARKING PROVIDED: 335
10’ DRIVE LANE
WIDTH VARIES
10’ DRIVE LANE
WIDTH VARIES
EAST DRIVE AISLE STRIPING LAYOUT
NTS
CURB
CURB
PAINTED STRIPE (TYP.)
PAINTED STRIPE (TYP.)
PHASE III BIKE PARKING CALCULATIONS
4 BIKE
SPACES
30 BIKE
SPACES
4 BIKE
SPACES
2 BIKE
SPACES
2 BIKE
SPACES
4 BIKE
SPACES
4 BIKE
SPACES
PROVIDED BIKE PARKING (PHASE I-II) = 335
BIKE PARKING REQUIRED (PHASE III): 16 BIKE
RACKS & 16 PERMANENT LOCKERS
30 PERMANENT LOCKERS PROVIDED.
20 BIKE RACKS PROVIDED
(SEE PLANS AND KEYS FOR SYMBOL &
LOCATIONS)
TOTAL BIKE PARKING (PHASE III) = 50 BIKE
RACKS & LOCKERS
PHASE III ENLARGEMENT PLAN PROPOSED IMPROVEMENTS KEY
PHASE III ENLARGEMENT PLAN - PROPOSED IMPROVEMENTS SCALE 1” = 20’-0”
PART OF FUTURE OFFSITE PUBLIC
IMPROVEMENT PLANS
PART OF FUTURE OFFSITE PUBLIC
IMPROVEMENT PLANS
12'
0 20 40
1"=20'-0"SCALE SECTION A-A1
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax: 619.557.2520
©
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD
MOUNTAIN VIEW, CA 94040
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
09.16.2024 - PLANNING SUBMITTAL 8
OC SD OAK
11300 Sorrento Valley Road, Suite 230
San Diego, CA 92121
858 625 0112
5-31-25
09-16-24
XXXXX
As indicated
20-015
CALIFORNIA STREET
SAN ANTONIO ROAD
SILICON WAY
EXISTING
PROMENADE
RETAIL BUILDING
EXISTING
RETAIL BUILDING
EXISTING
OFFICE & COMMERCIAL BUILDING
SECTION B-B1
L4.01
LANDSCAPE SECTIONS
12'
0 20 40
1"=20'-0"SCALE SECTION A-A1
©
Seal/Signature
Issue Date & Issue Description By Check
Project Name
Project Number
Description
Scale
THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
09.16.2024 - PLANNING SUBMITTAL 8
5-31-25
09-16-24
XXXXX
As indicated
20-015
SILICON WAY
EXISTING
RETAIL BUILDING
EXISTING
OFFICE & COMMERCIAL BUILDING
SECTION B-B1
L4.01
LANDSCAPE SECTIONS
PART OF FUTURE OFFSITE PUBLIC
IMPROVEMENT PLANS
12'
0 20 40
1"=20'-0"SCALE
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax: 619.557.2520
©
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD
MOUNTAIN VIEW, CA 94040
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
09.16.2024 - PLANNING SUBMITTAL 8
OC SD OAK
11300 Sorrento Valley Road, Suite 230
San Diego, CA 92121
858 625 0112
5-31-25
09-16-24
XXXXX
As indicated
20-015
CALIFORNIA STREET
SILICON WAY
EXISTING
PROMENADE
RETAIL BUILDING
EXISTING
RETAIL BUILDING
XISTING
OFFICE & COMMERCIAL BUILDING
SECTION B-B1
L4.01
LANDSCAPE SECTIONS
05 10
1”=5’ - 0” SECTION SCALE
PART OF FUTURE OFFSITE PUBLIC
IMPROVEMENT PLANS
PART OF FUTURE OFFSITE PUBLIC
IMPROVEMENT PLANS
12'
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax: 619.557.2520
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Sl
365 SAN ANTONIO ROAD
MOUNTAIN VIEW, CA 94040
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
09.16.2024 - PLANNING SUBMITTAL 8
OC SD OAK
11300 Sorrento Valley Road, Suite 230
San Diego, CA 92121
858 625 0112
5-31-25
09-16-24
XXXXX
20-015
CALIFORNIA STREET
SAN ANTONIO ROAD
SILICON WAY
EXISTING
PROMENADE
RETAIL BUILDING
EXISTING
RETAIL BUILDING
EXISTING
OFFICE & COMMERCIAL BUILDING
LANDSCAPE SECTIONS
B
B1
A A1
N.T.S.
PART OF FUTURE OFFSITE PUBLIC
IMPROVEMENT PLANS
PART OF FUTURE OFFSITE PUBLIC
IMPROVEMENT PLANS
12'
0 20 40
1"=20'-0"SCALE SECTION C-C1
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax: 619.557.2520
©
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD
MOUNTAIN VIEW, CA 94040
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
09.16.2024 - PLANNING SUBMITTAL 8
OC SD OAK
11300 Sorrento Valley Road, Suite 230
San Diego, CA 92121
858 625 0112
5-31-25
09-16-24
XXXXX
As indicated
20-015
LIMIT OF WORK
CALIFORNIA STREET
SAN ANTONIO ROAD
SILICON WAY
EXISTING
RETAIL BUILDING
PROMENADE
EXISTING
RETAIL BUILDING
EXISTING
OFFICE & COMMERCIAL BUILDING
SECTION D-D1
L4.02
LANDSCAPE SECTIONS
N.T.S.
PART OF FUTURE OFFSITE PUBLIC
IMPROVEMENT PLANS
12'
0 20 40
1"=20'-0"SCALE
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax: 619.557.2520
©
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD
MOUNTAIN VIEW, CA 94040
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
09.16.2024 - PLANNING SUBMITTAL 8
OC SD OAK
11300 Sorrento Valley Road, Suite 230
San Diego, CA 92121
858 625 0112
5-31-25
09-16-24
XXXXX
As indicated
20-015
LIMIT OF WORK
CALIFORNIA STREET
SILICON WAY
EXISTING
RETAIL BUILDING
PROMENADE
EXISTING
RETAIL BUILDING
EXISTING
OFFICE & COMMERCIAL BUILDING
SECTION D-D1
L4.02
LANDSCAPE SECTIONS
12'
0 20 40
1"=20'-0"SCALE SECTION C-C1
©
Seal/Signature
Issue Date & Issue Description By Check
Project Name
Project Number
Description
Scale
THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
09.16.2024 - PLANNING SUBMITTAL 8
5-31-25
09-16-24
XXXXX
As indicated
20-015
SILICON WAY
EXISTING
RETAIL BUILDING
EXISTING
OFFICE & COMMERCIAL BUILDING
SECTION D-D1
L4.02
LANDSCAPE SECTIONS
PART OF FUTURE OFFSITE PUBLIC
IMPROVEMENT PLANS
PART OF FUTURE OFFSITE PUBLIC
IMPROVEMENT PLANS
12'
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax: 619.557.2520
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD
MOUNTAIN VIEW, CA 94040
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6
10.29.2021 - PLANNING SUBMITTAL 7
09.16.2024 - PLANNING SUBMITTAL 8
OC SD OAK
11300 Sorrento Valley Road, Suite 230
San Diego, CA 92121
858 625 0112
5-31-25
09-16-24
XXXXX
As indicated
20-015
CALIFORNIA STREET
SAN ANTONIO ROAD
SILICON WAY
EXISTING
PROMENADE
RETAIL BUILDING
EXISTING
RETAIL BUILDING
EXISTING
OFFICE & COMMERCIAL BUILDING
LANDSCAPE SECTIONS
C C1
D
D1
0 5 10
1”=5’ - 0” SECTION SCALE
UP
ABOVE
OUTLINE
BLDG.
10'-0" 51.67 5-104
LOBBY
36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD
12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 27" SD 12" SD 12" SD 18" SD
18" SD 18" SD 18" SD 18" SD
10" SD 10" SD 10" SD 10" SD 18" SD 8" SD 4" S 4" W
4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W
4" W 4" W 4" W 4" W 4" W 4" W 4" W 10" SD 10" SD 6" SD
4" W
4" W
4" W
4" W
4" W 4" W 4" W 4" W 4" SD
4" S
8" SD 10" SD 4" S
4" W 4" W 4" W 4" W
4" SD 4" SD 4" SD
OH
OH
OH
OH OH OH OH OH
LIMIT OF WORK LIMIT OF WORK 4" W STOP
STOP
8" SD
8" SD CALIFORNIA NATIVE NON-CALIFORNIA NATIVE NON-CALIFORNIA NATIVE NON-CALIFORNIA NATIVE CALIFORNIA NATIVE NON-CALIFORNIA NATIVE CALIFORNIA NATIVE CALIFORNIA NATIVE CALIFORNIA NATIVE NON-CALIFORNIA NATIVE CALIFORNIA NATIVE CALIFORNIA NATIVE CALIFORNIA NATIVE CALIFORNIA NATIVE NON-CALIFORNIA NATIVE CALIFORNIA NATIVE TREES BOTANICAL NAME COMMON NAME SIZE WUCOLS QTY REMARKS ACER RUBRUM `OCTOBER GLORY` OCTOBER GLORY RED MAPLE 36" BOX M 5 ARBUTUS X `MARINA` ARBUTUS STANDARD 36" BOX L 1 CERCIS CANADENSIS EASTERN REDBUD 36" BOX M 5 EXISTING TREE EXISTING 4 TO BE PROTECTED IN PLACE - SEE EXISTING TREE PLAN GARRYA ELLIPTICA 'EVIE' EVIE COAST SILKTASSEL 24" BOX 3 MAGNOLIA GRANDIFLORA `MAJESTIC BEAUTY` TM SOUTHERN MAGNOLIA 36" BOX M 6 SHRUBS BOTANICAL NAME COMMON NAME SIZE WUCOLS SPACING QTY REMARKS ARTEMISIA CALIFORNICA 'MONTARA' MONTARA CALIFORNIA SAGEBRUSH 5 GAL L 30" o.c. 15 CAREX PANSA SANDDUNE SEDGE 1 GAL M 12" o.c. 376 DIETES GRANDIFLORA `VARIEGATA` STRIPED FORTNIGHT LILY 5 GAL M 30" o.c. 60 EXISTING SHRUB EXISTING 30" o.c. 100 TO BE PROTECTED IN PLACE HEUCHERA MAXIMA ISLAND ALUM ROOT 1 GAL M 18" o.c. 92 MAHONIA REPENS CREEPING MAHONIA 5 GAL L 30" o.c. 106 POLYSTICHUM MUNITUM WESTERN SWORD FERN 5 GAL M 30" o.c. 150 RHAMNUS CALIFORNICA 'LITTLE SUR' LITTLE SUR COFFEEBERRY 5 GAL L 36" o.c. 35 ROSMARINUS OFFICINALIS 'HUNTINGTON CARPET' HUNTINGTON CARPET ROSEMARY 5 GAL L 30" o.c. 196 WOODWARDIA FIMBRIATA GIANT CHAIN FERN 5 GAL M 36" o.c. 14 2024-08-28 10:39 PLANT SCHEDULE GROUND LEVEL CALIFORNIA NATIVE CALIFORNIA NATIVE 0 20 40 1"=20'-0"SCALE POTTING SCHEDULE SYMBOL QTY. DESCRIPTION & FINISH BOTANICAL NAME COMMON NAME SIZE WUCOLS QTY. 09 DUNE BY OLD TOWN FIBERGLASS CHONDROPETALUM TECTORUM CAPE RUSH 15 GAL L 1 LARGE SIZE - CITRUS02, OCHRE03, LIME04, TEAL05 SEDUM RUPESTRE 'LEMON CORAL' N.C.N. 1 GAL L 5 6 DUNE BY OLD TOWN FIBERGLASS PHILODENDRON 'XANADU' WINTERBORN PHILO 5 GAL M 1 MEDIUM SIZE - CITRUS02, OCHRE03, LIME 04,TEAL05 SANSEVIERIA ZEYLANCA FAN SNAKE PLANT 1 GAL M 2 ASPIDITRA ELIATOR CAST IRON PLANT 1 GAL M 1 12 DUNE BY OLD TOWN FIBERGLASS BEGONIA RICHMONDENSIS RICHMOND BEGONIA 1 GAL M 2 SMALL SIZE - CITRUS02, OCHRE03, LIME04, TEAL05 JUNCUS PATENS COMMON RUSH 1 GAL M 1 A CALIFORNIA STREET
SAN ANTONIO ROAD SILICON WAY EXISTING RETAIL BUILDING
PROMENADE EXISTING RETAIL BUILDING EXISTING OFFICE & COMMERCIAL BUILDING B B A A A A AAAA A BB PLANTING NOTES · MULCH: ALL REQUIRED PLANTING AREAS AND ALL EXPOSED SOIL AREAS WITHOUT VEGETATION SHALL BE COVERED WITH FOREST MULCH TO A MINIMUM DEPTH OF 3 INCHES. · PLANTS SHALL BE GROUPED BY HYDROZONES (SIMILAR WATER NEEDS, SUN EXPOSURE, SLOPE, AND SOIL). 225 Broadway Suite 100 San Diego CA 92101 Tel: 619.557.2500 Fax: 619.557.2520 © Seal/Signature Issue Date & Issue Description By Check 425 CALIFORNIA ST. 11TH FLOOR SAN FRANCISCO, CA 94104 CONTACT: DAVID GEISER 415-693-9000 Project Name Project Number Description Scale 365 SAN ANTONIO ROAD MOUNTAIN VIEW, CA 94040 THE VILLAGE AT SAN ANTONIO CENTER - PHASE 3 THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3 02.20.2020 - PLANNING SUBMITTAL 1 07.10.2020 - PLANNING SUBMITTAL 2 10.07.2020 - PLANNING SUBMITTAL 3 05.05.2021 - PLANNING SUBMITTAL 4 07.19.2021 - PLANNING SUBMITTAL 5 09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7 09.16.2024 - PLANNING SUBMITTAL 8 OC SD OAK 11300 Sorrento Valley Road, Suite 230 San Diego, CA 92121 858 625 0112 5-31-25 09-16-24 XXXXX As indicated 20-015 MAINTENANCE NOTE · ALL LANDSCAPING REQUIRED TO BE INSTALLED AS PART OF DEVELOPMENT PROJECT SHALL BE MAINTAINED FOR THE LIFE OF THE PROJECT BY THE OWNER. MAINTENANCE OF LANDSCAPING SHALL CONSIST OF REGULAR WATERING, PRUNING, FERTILIZING, CLEARING OF DEBRIS AND WEEDS, THE REMOVAL AND REPLACEMENT OF DEAD PLANTS, AND THE REPAIR AND REPLACEMENT OF IRRIGATION SYSTEMS AND INTEGRATED ARCHITECTURAL FEATURES. L5.01 EXISTING SHRUBS - REFER TO PLANTING SCHEDULE B B C CC C C CC CCC PLANTING PLAN - LEVEL 1 18" TALL SCREENING SHRUB REFER TO PLANT SCHEDULE FOR SPECIES BC CC STAIR 1 ELEC. IDF JAN. OFFICE LEVEL 03 31,000 GSF SHRUBS BOTANICAL NAME COMMON NAME SIZE WUCOLS SPACING QTY REMARKS ROSMARINUS OFFICINALIS 'HUNTINGTON CARPET' HUNTINGTON CARPET ROSEMARY 5 GAL L 30" o.c. 47 2021-09-23 08:10 PLANT SCHEDULE LEVEL 3 CALIFORNIA NATIVE NON-CALIFORNIA NATIVE STAIR 1 ELEC. IDF JAN. OFFICE LEVEL 02 31,000 GSF SHRUBS BOTANICAL NAME COMMON NAME SIZE WUCOLS SPACING QTY REMARKS ROSMARINUS OFFICINALIS 'HUNTINGTON CARPET' HUNTINGTON CARPET ROSEMARY 5 GAL L 30" o.c. 47 2021-09-23 08:11 PLANT SCHEDULE LEVEL 2 CALIFORNIA NATIVE NON-CALIFORNIA NATIVE LEVEL 3 225 Broadway Suite 100 San Diego CA 92101 Tel: 619.557.2500 Fax: 619.557.2520 © Seal/Signature Issue Date & Issue Description By Check 425 CALIFORNIA ST. 11TH FLOOR SAN FRANCISCO, CA 94104 CONTACT: DAVID GEISER 415-693-9000 Project Name Project Number Description Scale 365 SAN ANTONIO ROAD MOUNTAIN VIEW, CA 94040 THE VILLAGE AT SAN ANTONIO CENTER - PHASE 3 THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3 02.20.2020 - PLANNING SUBMITTAL 1 07.10.2020 - PLANNING SUBMITTAL 2 10.07.2020 - PLANNING SUBMITTAL 3 05.05.2021 - PLANNING SUBMITTAL 4 07.19.2021 - PLANNING SUBMITTAL 5 09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7 09.16.2024 - PLANNING SUBMITTAL 8 OC SD OAK 11300 Sorrento Valley Road, Suite 230 San Diego, CA 92121 858 625 0112 5-31-25 09-16-24 XXXXX As indicated 20-015 PLANTING PLAN - LEVEL 2 & 3 MAINTENANCE NOTE · ALL LANDSCAPING REQUIRED TO BE INSTALLED AS PART OF DEVELOPMENT PROJECT SHALL BE MAINTAINED FOR THE LIFE OF THE PROJECT BY THE OWNER. MAINTENANCE OF LANDSCAPING SHALL CONSIST OF REGULAR WATERING, PRUNING, FERTILIZING, CLEARING OF DEBRIS AND WEEDS, THE REMOVAL AND REPLACEMENT OF DEAD PLANTS, AND THE REPAIR AND REPLACEMENT OF IRRIGATION SYSTEMS AND INTEGRATED ARCHITECTURAL FEATURES. L5.02 PLANTING NOTES · MULCH: ALL REQUIRED PLANTING AREAS AND ALL EXPOSED SOIL AREAS WITHOUT VEGETATION SHALL BE COVERED WITH FOREST MULCH TO A MINIMUM DEPTH OF 3 INCHES. · PLANTS SHALL BE GROUPED BY HYDROZONES (SIMILAR WATER NEEDS, SUN EXPOSURE, SLOPE, AND SOIL). LEVEL 2 0 20 40 1"=20'-0"SCALE SHRUBS BOTANICAL NAME COMMON NAME SIZE WUCOLS SPACING QTY REMARKS GELSEMIUM SEMPERVIRENS JESSAMINE ESPALIER 5 GAL L 30" o.c. 31 LOMANDRA LONGIFOLIA 'PLATINUM BEAUTY' VARIEGATED DWARF MAT RUSH 5 GAL L 30" o.c. 73 OPHIOPOGON JABURAN CLUMPING LILYTURF 1 GAL M 30" o.c. 26 ROSMARINUS OFFICINALIS 'HUNTINGTON CARPET' HUNTINGTON CARPET ROSEMARY 5 GAL L 30" o.c. 80 VINCA MAJOR LARGE PERIWINKLE 1 GAL M 24" o.c. 27 2021-09-23 08:07 PLANT SCHEDULE LEVEL 5 CALIFORNIA NATIVE NON-CALIFORNIA NATIVE NON-CALIFORNIA NATIVE NON-CALIFORNIA NATIVE NON-CALIFORNIA NATIVE NON-CALIFORNIA NATIVE STAIR 1 ELEC. IDF JAN. OFFICE LEVEL 04 31,000 GSF SHRUBS BOTANICAL NAME COMMON NAME SIZE WUCOLS SPACING QTY REMARKS ROSMARINUS OFFICINALIS 'HUNTINGTON CARPET' HUNTINGTON CARPET ROSEMARY 5 GAL L 30" o.c. 47 2021-09-23 08:09 PLANT SCHEDULE LEVEL 4 CALIFORNIA NATIVE NON-CALIFORNIA NATIVE 0 20 40 1"=20'-0"SCALE 225 Broadway Suite 100 San Diego CA 92101 Tel: 619.557.2500 Fax: 619.557.2520 © Seal/Signature Issue Date & Issue Description By Check 425 CALIFORNIA ST. 11TH FLOOR SAN FRANCISCO, CA 94104 CONTACT: DAVID GEISER 415-693-9000 Project Name Project Number Description Scale 365 SAN ANTONIO ROAD MOUNTAIN VIEW, CA 94040 THE VILLAGE AT SAN ANTONIO CENTER - PHASE 3 THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3 02.20.2020 - PLANNING SUBMITTAL 1 07.10.2020 - PLANNING SUBMITTAL 2 10.07.2020 - PLANNING SUBMITTAL 3 05.05.2021 - PLANNING SUBMITTAL 4 07.19.2021 - PLANNING SUBMITTAL 5 09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7 09.16.2024 - PLANNING SUBMITTAL 8 OC SD OAK 11300 Sorrento Valley Road, Suite 230 San Diego, CA 92121 858 625 0112 5-31-25 09-16-24 XXXXX As indicated 20-015 PLANTING PLAN - LEVEL 6 & 7 L5.03 LEVEL 5 MAINTENANCE NOTE · ALL LANDSCAPING REQUIRED TO BE INSTALLED AS PART OF DEVELOPMENT PROJECT SHALL BE MAINTAINED FOR THE LIFE OF THE PROJECT BY THE OWNER. MAINTENANCE OF LANDSCAPING SHALL CONSIST OF REGULAR WATERING, PRUNING, FERTILIZING, CLEARING OF DEBRIS AND WEEDS, THE REMOVAL AND REPLACEMENT OF DEAD PLANTS, AND THE REPAIR AND REPLACEMENT OF IRRIGATION SYSTEMS AND INTEGRATED ARCHITECTURAL FEATURES. PLANTING NOTES · MULCH: ALL REQUIRED PLANTING AREAS AND ALL EXPOSED SOIL AREAS WITHOUT VEGETATION SHALL BE COVERED WITH FOREST MULCH TO A MINIMUM DEPTH OF 3 INCHES. · PLANTS SHALL BE GROUPED BY HYDROZONES (SIMILAR WATER NEEDS, SUN EXPOSURE, SLOPE, AND SOIL). LEVEL 4 SHRUBS BOTANICAL NAME COMMON NAME SIZE WUCOLS SPACING QTY REMARKS GELSEMIUM SEMPERVIRENS JESSAMINE ESPALIER 5 GAL L 30" o.c. 75 LOMANDRA LONGIFOLIA 'PLATINUM BEAUTY' VARIEGATED DWARF MAT RUSH 5 GAL L 30" o.c. 131 ROSMARINUS OFFICINALIS 'HUNTINGTON CARPET' HUNTINGTON CARPET ROSEMARY 5 GAL L 30" o.c. 155 2021-09-23 08:05 PLANT SCHEDULE LEVEL 7 CALIFORNIA NATIVE NON-CALIFORNIA NATIVE NON-CALIFORNIA NATIVE NON-CALIFORNIA NATIVE 0 20 40 1"=20'-0"SCALE 225 Broadway Suite 100 San Diego CA 92101 Tel: 619.557.2500 Fax: 619.557.2520 © Seal/Signature Issue Date & Issue Description By Check 425 CALIFORNIA ST. 11TH FLOOR SAN FRANCISCO, CA 94104 CONTACT: DAVID GEISER 415-693-9000 Project Name Project Number Description Scale 365 SAN ANTONIO ROAD MOUNTAIN VIEW, CA 94040 THE VILLAGE AT SAN ANTONIO CENTER - PHASE 3 THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3 02.20.2020 - PLANNING SUBMITTAL 1 07.10.2020 - PLANNING SUBMITTAL 2 10.07.2020 - PLANNING SUBMITTAL 3 05.05.2021 - PLANNING SUBMITTAL 4 07.19.2021 - PLANNING SUBMITTAL 5 09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7 09.16.2024 - PLANNING SUBMITTAL 8 OC SD OAK 11300 Sorrento Valley Road, Suite 230 San Diego, CA 92121 858 625 0112 5-31-25 09-16-24 XXXXX As indicated 20-015 PLANTING PLAN - LEVEL 6 & 7 LEVEL 7 L5.04 MAINTENANCE NOTE · ALL LANDSCAPING REQUIRED TO BE INSTALLED AS PART OF DEVELOPMENT PROJECT SHALL BE MAINTAINED FOR THE LIFE OF THE PROJECT BY THE OWNER. MAINTENANCE OF LANDSCAPING SHALL CONSIST OF REGULAR WATERING, PRUNING, FERTILIZING, CLEARING OF DEBRIS AND WEEDS, THE REMOVAL AND REPLACEMENT OF DEAD PLANTS, AND THE REPAIR AND REPLACEMENT OF IRRIGATION SYSTEMS AND INTEGRATED ARCHITECTURAL FEATURES. PLANTING NOTES · MULCH: ALL REQUIRED PLANTING AREAS AND ALL EXPOSED SOIL AREAS WITHOUT VEGETATION SHALL BE COVERED WITH FOREST MULCH TO A MINIMUM DEPTH OF 3 INCHES. · PLANTS SHALL BE GROUPED BY HYDROZONES (SIMILAR WATER NEEDS, SUN EXPOSURE, SLOPE, AND SOIL).
PP PP PP TS RETAIL 212 2-131 TRANSFORMER ROOM500 KW GENERATOR DN B1-119 RETAIL 212 2-131 RAMP DOWN GARAGE AIR EXHAUST 125.21 S.F. MAIN ELECTRIC 2-119 ROOM 2-121 TRASH/LOADING 2-120 DOCK TENANT EMER. & GENERATORS 2-128 DN GARAGE ENTRY DN UP CINEMA LOBBY 601 ABOVE OUTLINE BLDG. ESCALATOR # 1 633 RESTAURANT/ RETAIL 602 10'-0" ELEVATOR #2 606 51.67 51.67 BUILDING 2 WORKPOINT BLDG. 6 5-104 LOBBY 5-103 RISER UP ELEC. RM. TRANF. RM. GEN EMRG VAN
DEMOLISH PARKING LOT
REMOVE SIDEWALK AS NECESSARY
PROTECT TRAFFIC SIGNAL IN PLACE
REMOVE TREES
REMOVE POWER POLE
REMOVE TREE
REMOVE POWER POLE
DEMOLISH BUILDING
REMOVE TREE
REMOVE SIDEWALK AS NECESSARY
REMOVE LIGHT POLE
REMOVE LIGHT POLE
REMOVE LIGHT POLE
REMOVE LIGHT POLE
PROTECT FIRE HYDRANT
IN PLACE
DEMOLITION LIMIT
DEMOLITION LIMIT
REMOVE CANOPY
DEMOLISH BUILDING
DEMOLITION LIMIT
DEMOLITION LIMIT
REMOVE WATER METER, BACK FLOW PREVENTER, AND CAP
PROTECT IRRIGATION METER IN PLACE
REMOVE SEWER CLEANOUT AND CAP
PROTECT STORM DRAIN IN PLACE
PROTECT MODULAR WETLAND IN PLACE
PROTECT ELECTRICAL VAULT IN PLACE
PROTECT ELECTRICAL VAULT IN PLACE
PROTECT UTILITY VAULT IN PLACE
REMOVE METER, BACKFLOW PREVENTER, AND CAP
REMOVE IRRIGATION SYSTEM
REMOVE SEWER CLEANOUT AND CAP
195.63' 10' 11' 11' 6' 12'
8.52' 5.48' 12' 11' 12' 4' 10'
REMOVE OVERHEAD POWER LINES
DEMOLISH DRIVEWAY
DEMOLISH CURB RAMP
PROTECT EXISTING CURB AND GUTTER
64'
3' 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 12" SD 18" SD 27" SD 27" SD
10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 6" W 8" W 12" SD
12" SD 18" SD 18" SD 18" SD 18" SD 18" SD 18" SD 10" SD 10" SD 10" SD 10" SD 18" SD
8" SD 10" SD 10" SD
4" S
4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W
4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W
4" W
10" SD 10" SD
6" SD 4" W 4" W 4" W 4" W 4" W 4" W 4" W
4" W
4" SD 4" S 8" SD
10" SD
4" S4" W 4" W
4" W 4" W 4" SD 4" SD 4" SD
OH
OH
OH
OH
OH
OH
OH
OH
CALIFORNIA STREET SAN ANTONIO ROAD
SILICON WAY
1"=20'
C2.01
DEMOLITION PLAN
1" = 20' - 0"
DEMOLITION PLAN 01
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax: 619.557.2520
©
Seal/Signature
Issue Date & Issue Description By Check
MERLONE GEIER PARTNERS
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
THE VILLAGE AT SAN ANTONIO CENTER - PHASE III
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE III
SCALE:
GENSLER 55.7739.000
PSOMAS 1MER010101
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7 PP PP PP TS UP 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 36" SD 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 30" SD 12" SD 18" SD 27" SD 27" SD
10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 10" W 6" W 8" W 12" SD
12" SD 18" SD 18" SD 18" SD 18" SD 18" SD 18" SD 10" SD 10" SD 10" SD 10" SD 18" SD
8" SD 10" SD
4" S
4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W
4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W
4" W
10" SD 10" SD 10" SD
6" SD 4" W 4" W 4" W 4" W 4" W 4" W 4" W
4" W
4" SD
4" SD 4" S 8" SD
10" SD 10" SD
4" S 6" SD 4" W 4" W
4" W 4" W 4" W 4" SD 4" SD 4" SD
I
I
I
OH
OH
OH
OH
OH
OH
OH
OH
1+00 2+00 3+00 4+00 5+00 17+00 18+00 19+00
T EV EV
EV
GM
B44 B44 B44
FRONT
54.08 TC 53.90TC
52.33 TC
51.60 TC
51.91 TC
51.91 TC
52.90 TC
52.44 TC
HP
52.00 TC
51.04 TC
50.00 TC
50.64 TC
50.70 TC
51.31 TC
51.50 TC
48.58 TC
0" CF
49.32 TC
49.63 TC
50.09 TC
50.16 TC
50.32 TC
52.35 52.52
52.11 53.23
52.07 53.14 TC
51.56 TC 53.19 TC 52.50
50.30 TC
52.23 TC
50.02 TC
49.50 TC 49.86 TC
52.40 TC
CALIFORNIA ST SAN ANTONIO RD
50.76 TC
50.65 TC
50.36 TC
49.92 TC 49.53 TC 49.69 TC
49.39 TC
52.15 TC
STOP STOP
PROPOSED STOP
SIGN AND MARKING
PROPOSED
STOP SIGN
SUBTERRANEAN
PARKING
STRUCTURE
SILICON WAY PROMENADE
FLOORS ABOVE
52.17 TC
12' 14' PUBLIC ACCESS 16.4'
TRAFFIC SAFETY VISIBILITY AREA
TRAFFIC SAFETY VISIBILITY AREA
VEHICULAR TRIANGLE OF SAFETY
PEDESTRIAN TRIANGLE OF SAFETY
VEHICULAR TRIANGLE OF SAFETY
PEDESTRIAN TRIANGLE OF SAFETY
EXISTING FIRE HYDRANT
TRAFFIC SAFETY
VISIBILITY AREA
TRAFFIC SAFETY
VISIBILITY AREA
PEDESTRIAN TRIANGLE
OF SAFETY
VEHICULAR TRIANGLE
OF SAFETY
TRAFFIC SAFETY VISIBILITY AREA
PROPOSED STOP MARKING
PEDESTRIAN
TRIANGLE OF SAFETY
PEDESTRIAN TRIANGLE OF SAFETY
VEHICLE TRIANGLE OF SAFETY
SUBTERRANEAN
PARKING
STRUCTURE 1'- WIDE PROPOSED PEDESTRIAN EXISTING 5' STREET EASEMENT 1'- WIDE PROPOSED PEDESTRIAN PROPOSED 5' STREET EASEMENT 14' PUBLIC ACCESS 14' PUBLIC ACCESS
7' STREET EASEMENT
RIGHT-OF-WAY
FLOORS ABOVE ACCESS EASEMENT ACCESS EASEMENT SU-30 - Single Unit Truck
53.50 52.57
51.73 49.83 50.07
53.50 51.52
51.84 49.69
53.40 52.47
50.04 1.5%
49.83 FF=49.85
FF=53.52 FF=51.75 FF=53.52
FF=50.09 4.9%
53.21 51.25
FF=49.851.8%1.0%1.9%
50.85 50.05 1.5%49.78
FF=52.59
50.22 49.70
1.5% 1.5%
49.63 1.5%
51.46 50.96
1.5%
1.5%
51.28 4.8% 1.5%
51.00 4.8%
49.77 49.96
1.5%
1.5%
51.40 1.5%
51.13 49.53
50.11 49.83 49.99 50.06
49.82 49.72
49.66 49.60
49.66 49.60
49.52 49.54
49.59 50.33
50.02 1.5% 1.5% 1.5%
49.55 50.56
1.5%
8.33%
4.0% 4.4%
52.42 1.5% 2.1% 7.6%
RETAIL 2 RETAIL 3
RETAIL 4
OFFICE LOBBY RETAIL 1
53.50 RETAIL 5 FF=51.27
50.07 49.88
OFFICE
SUPPORT-2
OFFICE
SUPPORT-1
LOADING ZONE/YELLOW CURB CONSTRUCTED
AS PART OF PHASE II TO BE UTILIZED PER CITY
CODE CHAPTER 19 DIV. 4 SECTIONS 19.86 AND
19.87 FOR PURPOSES OF LOADING OR
UNLOADING PASSENGERS AND LOADING OR
UNLOADING OF MATERIALS.
50.23 50.29
50.17 50.23
52.57 DOOR TO REMAIN
OPEN DURING
BUSINESS HOURS
ALL CURB ON SILICON WAY TO BE PAINTED RED
WITH WHITE STENCILE "NO PARKING-FIRE LANE"
52.33 52.30
1.5%
52.50 52.46
1.5%
52.42 52.39
1.5%
1.5%
1.5%1.5% 1.5%
1.5%
1.5% 1.5%
1.5% 1.5% 1.5% 1.5% 1.5%
PHASE II LOADING DOCK RETAIL 6 FF=53.40
51.24 53.38
16.5'
BUILDING
29.0'
1.5%
1.5%
PL
6" STORM DRAIN
PERFORATED PIPE
PARKING STRUCTURE LIMIT
AREA DRAIN
AMOEBA
14.0'
CALIFORNIA STREET
BUILDING
1.5%
1.5%
14.0'
FC TO PL 15.0'
29.0'
PL
PERFORATED PIPE
PARKING STRUCTURE LIMIT
6" STORM DRAIN
AMOEBA
AREA DRAIN
SAN ANTONIO ROAD
16.5'
BUILDING
29.0'
1.5%
1.5%
PL
6" STORM DRAIN
PARKING STRUCTURE LIMIT
AREA DRAIN
14.0'
4.0'
1.5%
CALIFORNIA STREET
GRAPHIC SCALE
SCALE: 1" =
0 20 40
20'
20 10 1"=20'
C3.01
CONCEPTUAL GRADING PLAN
1" = 20' - 0"
CONCEPTUAL GRADING PLAN 01
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax: 619.557.2520
© 2021 PSOMAS
Seal/Signature
Issue 9/16/2024 DRC
MERLONE GEIER PARTNERS
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
THE VILLAGE AT SAN ANTONIO CENTER - PHASE III
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE III
SCALE:
GENSLER 55.7739.000
PSOMAS 1MER010101
No. C62005
REGISTERED PROFESSIONAL ENGINEER
STATE OF CAL I FORN I A
C I V I L
DAVID I . BROTCHIE
1650 SPRUCE STREET, SUITE 400
RIVERSIDE, CA 92507
(951) 787-8421 WWW.PSOMAS.COM
BENCHMARK
CITY OF MOUNTAIN VIEW BENCHMARK NO. IV-11. BRONZE DISK SET IN TOP OF CURB,
CENTER OF RETURN OF
SOUTHEAST CORNER OF CALIFORNIA STREET AND SAN ANTONIO ROAD.
ELEVATION = 49.66 FEET (1999 ADJUSTMENT), BASED UPON THE NORTH AMERICAN VERTICAL DATUM OF 1988
(NAVD88).
BASIS OF BEARINGS
THE BEARING OF S 26°36'47" W BETWEEN THE FOUND MONUMENTS INDICATED HEREON
ON THE CENTERLINE LINE
OF SAN ANTONIO ROAD WAS TAKEN AS THE BASIS OF BEARINGS FOR THIS SURV
EARTHWORK
CUT: 61,500 CUBIC YARDS (INCLUDES STRUCTURE)
FILL: 1,400 CUBIC YARDS
NET: 60,4100 CUBIC YARDS EXPORT
TYPICAL CROSS SECTION ALONG CALIFORNIA ST. W/ AMOEBA
NOT TO SCALE
TYPICAL CROSS SECTION ALONG SAN ANTONIO RD
TYPICAL CROSS SECTION ALONG CALIFORNIA ST. NOT TO SCALE
NOT TO SCALE
Issue Date & Issue Description By Check
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7 10.29.2021 - PLANNING SUBMITTAL 7
09.12.2024 - PLANNING SUBMITTAL 7. REV B
SILICON WAY
OUTDOOR
LIVING
ROOM
OUTDOOR
LIVING
ROOM "BREEZEWAY" PROMENADE EXTENSION
COMMERCIAL RETAIL
LEVEL 01
1000 GSF
CALIFORNIA ST SAN ANTONIO RD PROMENADE
STAIR 1
1 2 3 4 5 6 7 8 9 10
LOBBY / LOUNGE
MAIN
ELEC
MEN WOMEN
ELEV.
LOBBY
STAIR 2
OFFICE SUPPORT
FCC
3A
3B
3D
3E
3F
3H
3G
3C
RECYCLE/
REFUSE/
LOADING
TRANSFORMERS
GENERATORS
MPOE
GARAGE
EXHAUST
COMMERCIAL RETAIL
LEVEL 01
3,150 GSF
OFFICE
LEVEL 01
9,535 GSF
COMMERCIAL RETAIL
LEVEL 01
3,660 GSF
COMMERCIAL RETAIL
LEVEL 01
2,835 GSF
COMMERCIAL RETAIL
LEVEL 01
2,325 GSF TRANSFORMER ROOM500 KW GENERATOR GARAGE AIR EXHAUST 125.21 S.F. 2-121GENERATORS TRANF. RM. GEN EMRG S01 S01 S01
S01
S01
S01
S01
S01 S01 S01 S01 S01 S01
S01
S01
S01
S03
S03
S03
S03
S03
S03
S03
S03
S03
S03
S03
S03
S02 S02 S02 S02 S02 S02 S02 S02 S02 S02 S02 S02
S02
S02 S02
S02
S02
S02
S03
S03
S03
S03
S03
S03
S03
S03
S01
S01
S01
S01
S01 S01
S02
S02
S02
S02
2.3 3.2 1.9 3.6 3.2 3.0 3.3 3.3 3.0 2.5 1.9 1.6 1.4
2.4 3.2 3.9 3.8 3.8 3.8 4.1 4.1 3.6 2.7 2.2 2.1 2.0
2.4 3.2 3.9 4.3 4.4 4.7 5.0 4.7 4.0 3.0 2.7 2.6 2.7
2.7 3.2 4.2 4.7 5.3 5.6 5.6 5.2 4.3 3.3 2.9 2.9 1.4
4.8 5.5 6.0 6.1 5.8 5.4 4.5 3.5 2.9 2.7 2.6
5.7 6.0 6.0 5.7 5.2 4.6 3.7 2.9 2.5 2.2
5.4 5.8 5.8 5.4 4.7 4.2 3.8 3.1 2.5 2.2
5.2 5.5 5.5 5.2 4.2 3.6 3.5 3.2 2.9 2.6
5.1 5.4 5.3 4.9 2.9 2.6 2.3 2.8 2.5 2.3
5.1 5.4 5.3 4.8 1.3 1.5 1.7
5.1 5.3 5.2 4.7 1.2 1.6 1.6
5.0 5.3 5.2 4.6 1.4 1.7 2.2
5.0 5.3 5.2 4.6 1.5 1.9
4.9 5.2 5.1 4.5 1.4 1.7 2.0
4.9 5.2 5.0 4.4 1.4 1.6 1.7
4.9 5.1 4.9 4.3 1.9 1.8 1.8
4.8 5.1 4.9 4.2 2.2 2.0 1.9
4.7 5.0 4.9 4.5 1.7 1.7 1.8
4.6 5.0 5.0 4.7 1.3 1.8 1.9
4.5 5.0 5.1 4.9 1.4 2.1 2.7
4.5 4.9 5.1 5.0 2.9 3.4 2.7 2.6 2.8 1.4
4.5 5.0 5.3 5.4 5.2 4.4 3.4 2.9 2.8 2.8
4.5 5.0 5.2 5.4 5.2 4.9 4.0 3.2 2.8 2.6
4.4 4.9 5.1 5.2 5.1 5.0 4.5 3.7 3.2 2.8
4.3 4.7 4.9 5.0 5.0 4.8 4.7 4.2 3.6 3.0
3.3 4.0 4.4 4.7 4.8 4.8 4.8 4.4 3.8 3.2 2.8
2.4 3.2 3.7 4.2 4.4 4.6 4.7 4.6 3.9 3.3 2.9 2.6
2.4 2.7 3.2 3.6 3.9 4.2 4.5 4.7 4.4 3.6 3.1 2.9 2.9
2.5 3.0 3.2 3.2 3.3 3.5 3.8 4.3 4.1 3.3 3.0 3.0 1.4
2.3 2.8 3.0 2.8 2.8 2.9 3.1 3.5 3.7 3.1 2.7 2.6 2.7
2.3 2.4 2.6 2.8 2.8 2.8 2.8 2.8 3.1 2.9 2.4 2.1 1.9
2.5 2.2 2.4 2.8 3.1 3.0 2.6 2.4 2.5 2.7 2.2 1.7 1.4
2.5 2.0 2.2 2.7 2.7 1.4 2.4 2.1 2.0 2.4 2.2 1.7 1.4
0.4 0.3 0.3 0.2 0.2
0.7 0.6 0.4 0.3 0.2
1.2 1.0 0.7 0.5 0.3
1.2 1.2 1.1 0.8 0.5
1.2 1.1 1.2 1.1 0.7
1.6 1.2 1.1 1.2 0.9
2.0 1.5 1.1 1.1 1.0
2.4 1.6 1.1 1.1 1.1
2.1 1.6 1.1 1.2 1.0
1.8 1.4 1.2 1.3 0.9
1.8 1.6 1.5 1.2 0.8
2.3 2.1 1.7 1.1 0.7
2.1 1.9 1.6 1.1 0.7
1.6 1.4 1.4 1.2 0.8
1.6 1.2 1.1 1.2 0.9
1.7 1.3 1.0 1.1 1.0
2.1 1.4 0.9 1.0 1.0
1.7 1.3 1.0 1.1 1.0
1.6 1.3 1.1 1.2 0.9
1.7 1.6 1.5 1.3 0.8
1.9 2.0 1.8 1.3 0.8
1.7 1.6 1.6 1.3 0.8
1.8 1.4 1.2 1.3 1.0
2.1 1.6 1.1 1.2 1.1
2.5 1.7 1.1 1.2 1.1
2.2 1.7 1.2 1.3 1.1
2.1 1.6 1.4 1.4 1.0
2.3 2.0 1.8 1.4 0.9
2.7 2.4 2.1 1.4 0.8
2.4 2.1 1.9 1.4 0.9
2.1 1.6 1.5 1.4 1.0
2.2 1.6 1.2 1.3 1.1
2.5 1.7 1.2 1.2 1.1
2.1 1.5 1.1 1.2 1.0
1.7 1.2 1.1 1.2 0.9
1.2 1.1 1.1 1.1 0.7
1.2 1.2 1.1 0.8 0.5
1.2 1.0 0.8 0.5 0.3
0.8 0.6 0.5 0.3 0.2
0.4 0.4 0.3 0.2 0.2
0.3 0.2 0.2 0.1 0.1
0.2 0.2 0.1 0.1 0.1
3.0 4.1 4.7 3.0 3.8 4.8 3.1 3.6 4.8 3.7 3.4 4.6 3.9 3.0 4.3 4.4 3.0 4.1 4.8 2.9 3.8 4.9 3.3 3.7 4.9 3.7 3.4 4.6 4.1 3.2 4.3 4.2
3.5 4.1 4.9 3.1 3.9 5.3 3.8 3.8 4.8 3.7 3.3 4.6 4.6 3.6 4.4 4.6 3.0 3.9 5.0 3.5 4.2 5.3 3.5 3.5 4.8 4.1 3.9 5.1 4.6 3.3 4.3 4.6
2.7 3.1 2.7 2.0 2.9 3.5 2.8 2.9 2.9 2.0 2.4 3.1 2.9 3.1 3.3 2.5 2.1 2.8 2.9 2.7 3.5 3.2 2.1 2.6 2.9 2.3 3.2 3.8 2.7 2.6 3.2 2.7
2.0 2.1 1.8 1.8 1.9 1.9 2.0 2.0 1.8 1.7 1.8 1.8 1.9 2.1 1.9 1.7 1.8 1.9 1.8 2.0 2.1 1.9 1.8 1.9 1.9 1.9 2.1 2.1 2.0 2.2 2.2 2.1
1.9 2.2 2.4 2.2 2.0 1.8 1.6 1.9 2.0 2.2 2.0 1.9 1.8 1.7 1.9 1.9 2.2 2.2 2.0 1.8 1.6 2.0 2.0 2.3 2.2 2.1 1.8 1.8 2.2 2.3 2.6 2.5
1.9 2.5 1.0 2.2 2.1 1.8 1.6 2.0 2.2 2.3 2.0 1.8 1.6 2.0 2.1 1.9 2.1 1.8 1.6 2.1 2.3 2.4 2.2 1.8 1.7 2.3 2.7 1.0 2.7
0.9 1.0
0.5 0.7 0.9
0.3 0.4 0.8 1.1 0.9 0.9
0.2 0.3 0.6 0.9 0.9 0.8 1.1 1.4 1.6 1.9 1.7 1.6 1.9 1.8 1.7 1.7 1.7 1.7 1.7 1.6 1.5 1.5 1.5 1.6 1.8 1.7 1.5 1.5 1.5 1.6 1.7 1.8 1.7 1.7 1.6 1.6 1.7 1.8 1.8 1.8 1.8 1.7 1.8 1.9 2.0 2.0 2.0 1.9 1.8 1.7 1.4 1.3 1.6 1.6 1.3 1.1 1.0
0.1 0.2 0.4 0.8 1.0 0.9 0.8 0.9 1.1 1.4 1.7 1.8 1.6 1.3 1.1 1.2 1.5 1.9 1.7 1.3 1.1 1.0 1.1 1.4 1.9 1.7 1.3 1.0 1.0 1.1 1.5 1.9 1.8 1.3 1.1 1.1 1.2 1.6 2.0 1.8 1.4 1.2 1.2 1.4 1.9 2.1 1.8 1.4 1.2 1.2 1.1 1.3 1.3 1.1 0.8 0.6 0.6
0.1 0.2 0.3 0.5 0.8 1.0 1.0 0.9 1.0 1.3 1.7 1.8 1.5 1.2 1.1 1.2 1.4 1.6 1.5 1.3 1.1 1.0 1.1 1.3 1.5 1.5 1.3 1.1 1.0 1.1 1.4 1.6 1.5 1.3 1.1 1.1 1.2 1.5 1.7 1.6 1.3 1.2 1.2 1.4 1.7 1.8 1.6 1.3 1.2 1.2 1.2 1.2 1.0 0.7 0.5 0.4 0.3
0.1 0.1 0.2 0.3 0.5 0.7 0.9 1.0 1.0 1.1 1.1 1.2 1.2 1.1 1.1 1.1 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.9 0.9 0.9 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.1 1.1 1.0 1.0 1.0 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.0 0.8 0.6 0.4 0.3 0.3 0.2
1.7 1.6 1.7 1.8 1.6 1.7 1.4 1.7 1.6 1.7 1.8 1.6 1.6 2.0 1.8 1.3 1.3 1.8 1.7 1.2 1.4 2.0 2.1 1.6 1.4 2.0 2.3 1.9
2.0 1.6 1.5 1.8 1.8 1.6 1.6 1.9 2.0 1.6 1.5 1.7 1.9 1.5 1.6 1.8 2.0 1.5 1.3 1.3 1.8 1.7 1.2 1.3 1.6 2.0 1.7 1.5 1.4 2.1 2.4 2.0
1.5 1.4 1.4 1.9 2.0 1.5 1.4 1.5 1.5 1.4 1.4 1.8 2.0 1.5 1.3 1.5 1.5 1.3 1.1 1.3 1.7 1.7 1.3 1.1 1.4 1.5 1.4 1.2 1.4 1.9 2.2 2.1
1.1 1.3 1.6 1.9 2.0 1.7 1.4 1.3 1.3 1.3 1.5 1.9 2.0 1.7 1.4 1.3 1.2 1.2 1.3 1.5 1.5 1.5 1.5 1.3 1.2 1.2 1.3 1.3 1.5 1.6 1.7 1.8
0.7 0.7 0.7 0.5 0.4 0.4 0.4 0.6 0.9 1.0 1.0 1.0 1.0 1.1 1.0 1.0 1.1 1.1 1.0 1.0 1.1 1.1 1.0 1.0 1.0 1.1 1.0 1.0 1.0 1.0 0.9 0.8 0.8 0.9 1.0 1.1 1.0 1.1 1.1 1.1 0.9 0.9 1.1 1.3 1.3 1.4 1.4 1.4 1.4 1.1 0.9 0.7 0.6 0.6 0.5 0.5 0.4
1.0 1.0 1.0 0.9 0.7 0.6 0.7 0.9 1.0 0.9 0.8 0.8 0.9 1.1 1.5 1.6 1.3 1.0 0.9 0.9 0.9 1.1 1.4 1.6 1.4 1.1 0.9 0.9 0.9 1.0 1.2 1.2 1.2 1.2 1.0 0.9 0.9 0.9 1.0 1.3 1.4 1.4 1.5 1.4 1.3 1.3 1.4 1.5 1.6 1.6 1.3 1.0 0.9 0.8 0.8 0.8 0.7
0.8 0.8 0.9 1.0 1.1 0.9 1.0 1.1 0.9 0.8 1.0 1.1 1.1 1.1 1.6 1.9 1.4 1.1 1.1 1.2 1.1 1.1 1.5 1.9 1.4 1.1 1.1 1.1 1.0 0.9 1.1 1.6 1.6 1.2 1.0 1.1 1.2 1.2 1.0 1.2 1.7 1.9 1.6 1.4 1.5 1.8 1.8 1.7 1.8 2.0 1.9 1.5 1.3 1.3 1.3 1.3 1.2
1.1 1.0 0.9 0.9 1.2 1.3 1.3 1.1 0.9 1.1 1.4 1.6 1.4 1.4 1.6 1.8 1.5 1.5 1.5 1.6 1.5 1.4 1.6 1.9 1.5 1.4 1.5 1.6 1.4 1.2 1.1 1.7 1.8 1.2 1.2 1.4 1.7 1.6 1.4 1.3 1.8 2.2 1.7 1.6 2.1 2.4 2.5 2.4 2.2 2.3 2.4 2.1 1.9 1.8 1.7 1.5 1.3
1.6 1.5 1.3 1.0 1.2 1.5 1.5 1.1 1.0 1.3 1.9 0.7 1.8 1.6 1.7 1.8 1.6 1.7 2.1 0.7 1.8 1.6 1.7 1.8 1.6 1.6 2.0 0.6 1.9 1.4 1.2 1.7 1.8 1.3 1.3 1.7 0.6 2.1 1.6 1.4
2.1 1.6 1.3 1.0 1.4 1.6 1.4 1.0 1.2 1.6
2.1 1.6 1.2 1.4 1.6 1.4 1.0 1.1 1.4 1.8
2.6 2.2 1.8 1.5 1.6 1.6 1.4 1.1 1.0 1.2 1.4
1.9 1.9 1.8 2.1 2.4 2.3 1.7 1.2 1.1 1.1
1.6 1.6 1.9 2.6 3.3 3.7 3.4 1.2
2.3 2.3 2.1 2.5 3.4 3.6 4.1 1.3
2.9 2.6 2.3 2.3 3.4 4.1 2.6
1.7 2.8 2.4 2.5 3.6 4.4 2.6
2.6 2.5 2.4 2.8 3.7 4.0 3.2
2.0 1.9 2.1 3.0 4.1 4.1 1.9
2.2 2.1 2.2 3.0 4.1 4.4 2.5
3.3 2.9 2.6 2.8 3.7 4.0 3.2
2.0 3.2 2.8 2.8 3.8 4.2 2.0
3.0 2.6 2.6 3.0 4.0 4.5 2.6
2.3 2.1 2.1 3.0 4.0 4.2 3.6
2.3 2.3 2.5 3.4 4.4 3.7
3.2 3.2 3.3 4.0 5.0 3.8
2.4 3.7 3.6 4.0 4.5 4.2
3.0 3.0 3.3 4.2 4.8 2.9
2.5 2.5 3.0 4.3 5.2 3.5
2.9 3.0 3.3 4.3 4.8 4.2
3.5 3.6 3.9 4.5 4.9 2.9
2.1 3.3 3.5 4.4 5.3 3.7 1.2
2.9 2.8 3.0 4.1 5.4 5.6 2.8 1.4
2.7 2.6 2.9 4.3 6.1 5.2 4.4 3.8 1.0
1.4 2.7 3.2 4.5 6.3 6.1 5.3 5.0 3.4 1.2
2.8 2.7 3.1 4.1 5.8 7.1 5.8 4.7 5.4 3.6 2.4
2.1 2.1 2.3 3.4 5.1 5.5 5.7 6.4 5.0 4.3 4.9
1.3 1.3 1.7 2.5 3.2 3.7 4.7 4.3 3.2 4.5 4.9
1.1 1.3 1.6 2.0 2.1 2.2 2.3 1.9 2.2 2.9 2.7
1.1 1.3 1.6 1.6 1.3 1.2 1.5 1.7 2.0 2.0 1.7
1.2 1.2 1.0 1.2 1.6 2.1 2.4 2.1 1.5
1.2 1.8 2.6 2.1 1.5
0.2 0.3 0.4 0.6 0.7
0.3 0.5 0.8 0.9 1.0
0.5 0.8 1.0 0.9 0.8
0.7 1.0 0.9 0.8 1.0
0.8 1.0 0.9 1.1 1.4
0.9 1.0 1.0 1.4 2.0
1.0 1.2 1.2 1.7 2.2
1.0 1.5 1.6 1.8 2.1
1.0 1.7 1.9 1.6 1.6
1.0 1.6 1.8 1.8 1.9
1.1 1.4 1.5 2.0 2.5
1.1 1.3 1.4 2.1 2.8
1.1 1.5 1.6 2.1 2.6
1.2 1.8 1.8 1.8 2.0
1.2 1.9 1.9 1.7 1.8
1.2 1.7 1.9 2.2 2.5
1.2 1.5 1.8 2.5 3.3
1.2 1.6 1.9 2.4 3.0
1.3 1.9 1.9 1.9 2.2
1.3 2.0 1.9 1.7 2.0
1.3 1.8 1.9 2.2 2.5
1.2 1.6 1.9 2.7 3.4
1.3 1.7 2.0 2.5 3.0
1.3 2.0 2.0 2.0 2.3
1.3 2.1 2.1 2.1 2.4
1.4 1.9 2.3 2.8 3.2
1.4 1.9 2.2 2.8 3.4
1.5 2.0 1.9 2.2 2.6
1.5 2.0 1.7 1.8 2.4
1.4 1.8 1.7 1.9 2.4
1.2 1.5 1.6 2.1 2.6
1.0 1.3 1.3 1.7 2.2
0.8 1.1 1.1 1.1 1.4
0.5 0.9 1.1 1.0 1.0
0.3 0.5 0.8 1.0 1.1
0.2 0.3 0.5 0.7 0.8
0.1 0.2 0.2 0.3 0.4
0.1 0.1 0.1 0.2 0.2
0.0 0.1 0.1 0.1 0.1
0.0 0.0 0.1 0.1 0.1
0.0 0.0 0.0 0.1 0.1
0.0 0.0 0.0 0.0 0.1
Calculation Summary
Label Avg Max Min Avg/Min Max/Min
COMMERCIAL PLAZA AREA 3.57 6.1 1.2 2.98 5.08
EASTBOUND AREA 1.19 2.7 0.1 11.90 27.00
NORTH CANOPY AREA 2.82 5.3 1.0 2.82 5.30
NORTHBOUND AREA 1.20 2.1 0.1 12.00 21.00
SOUTH EXTERIOR 1.60 2.4 1.1 1.45 2.18
SOUTHBOUND AREA 1.26 2.5 0.4 3.15 6.25
WEST CANOPY AREA 2.87 7.1 1.0 2.87 7.10
WESTBOUND AREA 1.36 3.4 0.0 N.A. N.A.
Seal/Signature
Issue Date & Issue Description By Check
Project Name
Project Number
Description
Scale
THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3
55.7739.000
AS INDICATED
E1.00
ELECTRICAL SITE PHOTOMETRY PLAN
SCALE: 1/16" = 1' - 0"
ELECTRICAL SITE PHOTOMETRY PLAN 01
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax: 619.557.2520
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - BLOCK 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.06.2020 - PLANNING SUBMITTAL 3
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7 Calculation Summary Label Avg Max Min Avg/Min Max/Min Commercial Plaza Area 4.43 6.7 1.6 2.77 4.19 East Sidewalk 2.30 3.4 1.3 1.77 2.62 North Canopy Area 3.57 5.6 1.0 3.57 5.60 South Exterior 1.97 3.0 1.1 1.79 2.73 West Canopy Area 3.17 5.5 1.7 1.86 3.24 S02 S02 S02 S02 S02 S02 S03 S03 S03 S03 S03 S03 S03 S03 S03 S03 S03 S03 S03 S03 S02 S02 S02 S02 S02 S02 S02 S02 S02 S02 S02 S02 S02 S02 S03 S03 S03 S03 S03 S03 S01 S01 S01 S01 S01 S01 S01 S01 S01 S01 S01 S01 S01 S01 S01 S01 S01 S01 S01 S01 S01 S01 (X)S01 (X)S01 (X)S01 (X)S01 (X)S01 (X)S01 3.6 2.2 4.0 3.5 3.2 3.5 3.6 3.4 3.1 2.6 3.7 4.4 4.3 4.1 3.8 4.2 4.3 4.0 3.4 2.7 4.0 4.5 4.7 4.6 4.7 5.0 5.0 4.5 3.7 3.2 4.5 5.0 5.3 5.5 5.7 5.7 5.5 5.0 4.1 3.6 5.4 5.8 6.2 6.4 6.4 6.1 5.6 5.2 4.3 3.6 5.8 6.4 6.7 6.7 6.5 6.0 5.5 5.1 4.4 3.5 5.7 6.3 6.6 6.6 6.3 5.5 5.1 4.7 4.2 3.7 5.7 6.1 6.5 6.4 6.1 4.9 4.5 4.0 3.5 3.2 5.1 6.4 6.3 4.9 6.3 5.6 4.8 5.9 5.1 4.6 5.6 5.1 4.6 5.3 5.0 4.6 5.2 4.9 4.8 5.1 5.2 4.8 4.7 5.1 4.7 4.5 5.0 4.7 4.3 5.0 4.8 4.2 5.0 4.8 4.2 5.1 4.9 4.1 5.4 5.4 4.6 4.7 5.4 5.5 5.2 3.6 3.4 3.1 3.4 2.9 4.7 5.2 5.5 5.6 5.5 5.0 4.6 4.4 3.9 3.2 4.6 5.2 5.5 5.7 5.6 5.4 5.0 4.6 4.3 3.7 4.4 5.0 5.3 5.4 5.4 5.2 4.9 4.6 4.3 4.1 3.9 4.5 4.8 5.0 5.0 4.8 4.5 4.3 3.1 2.9 3.3 4.0 4.2 4.4 4.3 4.3 3.5 3.7 3.9 4.0 3.9 3.9 3.8 3.6 3.5 3.4 3.2 3.3 3.7 3.4 3.0 2.7 2.5 2.3 2.9 2.8 2.8 2.8 2.6 2.3 1.7 2.1 2.1 1.6 2.5 2.4 2.9 3.0 3.0 2.5 2.2 2.1 2.5 2.1 3.0 3.1 3.4 1.7 3.2 3.1 2.9 2.6 2.9 2.4 3.3 2.3 2.5 1.4 1.6 1.6 1.8 1.9 2.4 2.2 1.9 2.2 1.7 2.0 1.9 2.2 2.1 1.8 1.8 1.8 1.9 1.9 2.4 2.4 1.4 2.8 2.9 2.8 3.0 3.4 3.0 2.0 2.0 2.0 1.3 1.8 2.5 1.4 1.4 1.4 1.8 2.9 5.0 5.5 4.3 4.2 5.0 4.8 4.7 5.1 4.5 4.4 4.9 4.5 4.7 5.2 4.5 4.3 4.8 4.3 4.4 5.0 4.5 4.3 4.8 4.2 4.2 5.0 4.7 4.6 4.9 4.3 4.2 4.9 4.6 4.7 5.1 4.4 4.1 4.8 4.6 1.2 1.5 2.0 2.6 4.1 4.4 4.5 4.5 4.7 5.4 5.5 4.9 4.9 4.8 4.6 5.1 5.5 5.1 4.9 4.7 4.4 4.6 5.0 5.3 5.2 4.7 4.4 4.5 4.6 4.9 5.6 5.3 4.7 4.7 4.6 4.6 5.2 5.5 5.1 4.8 4.6 4.8 5.1 1.3 1.6 1.8 1.8 2.5 3.4 3.1 3.2 4.0 3.6 3.4 4.1 3.5 3.4 3.9 3.5 3.5 4.1 3.4 3.3 3.8 3.1 3.3 4.2 3.5 3.1 3.8 3.2 3.2 4.0 3.6 3.5 3.9 3.3 3.2 3.9 3.5 3.5 4.1 3.5 3.4 4.1 4.0 1.2 1.4 1.2 1.3 1.8 2.2 2.5 2.5 2.1 1.9 2.6 2.5 2.7 2.5 2.3 1.9 2.3 2.4 2.5 2.6 2.1 2.1 2.2 2.1 2.1 2.4 2.5 2.2 2.4 2.0 2.1 2.4 2.4 2.6 2.4 2.3 2.0 2.3 2.4 2.7 3.0 2.9 1.0 1.1 1.6 1.1 1.3 2.1 1.8 1.6 1.3 1.6 1.7 1.6 1.4 1.4 1.9 2.6 1.5 3.0 2.8 2.2 2.6 2.8 1.6 2.0 2.1 1.8 2.0 2.5 1.9 1.7 1.9 1.5 1.1 1.9 1.6 1.7 2.4 2.1 1.6 1.8 2.4 2.2 1.8 1.8 2.5 2.8 2.3 2.8 2.3 1.7 1.2 1.5 1.6 1.6 1.4 1.3 1.8 2.4 2.9 2.7 2.6 2.2 2.5 2.7 2.9 2.6 2.0 1.6 1.9 2.4 1.9 1.6 1.8 2.3 2.4 1.8 1.5 1.6 2.2 1.9 1.4 1.7 2.1 2.4 2.0 1.6 1.6 2.2 2.5 2.3 2.8 2.7 2.5 2.1 1.8 1.8 1.6 1.4 1.7 2.0 1.9 1.5 1.4 1.7 1.8 1.7 1.4 1.6 2.1 2.1 1.7 2.7 2.4 2.4 2.2 1.8 1.8 2.1 2.2 2.2 2.2 3.0 2.8 2.4 2.0 3.4 2.8 1.7 4.2 3.0 2.7 3.1 2.8 2.7 4.7 4.3 2.4 2.4 2.3 2.1 5.0 3.8 2.5 2.4 2.3 2.0 4.9 3.7 3.4 3.1 3.1 2.7 4.9 4.4 2.3 4.0 3.5 2.2 5.0 3.9 3.3 3.1 3.0 2.0 4.9 3.7 2.4 2.4 2.3 2.7 4.9 4.4 2.5 2.5 2.5 2.2 5.1 3.9 3.4 3.5 3.2 2.0 4.9 3.8 2.4 3.9 3.3 2.7 4.9 4.4 3.0 2.9 2.9 2.1 5.0 3.8 2.5 2.4 2.4 1.9 4.3 3.3 2.9 2.9 2.9 3.8 3.2 3.9 3.4 2.1 3.5 4.8 3.8 2.2 3.6 3.0 2.6 3.7 4.9 3.7 2.8 2.6 2.3 2.5 4.5 5.2 4.4 2.6 2.5 2.2 2.3 4.1 5.3 4.1 1.8 2.9 2.5 2.3 3.5 4.9 3.8 2.0 3.0 2.5 2.3 4.0 5.0 4.6 2.2 2.1 1.9 1.9 3.6 5.5 5.4 225 Broadway Suite 100 San Diego CA 92101 Tel: 619.557.2500 Fax: 619.557.2520 Seal/Signature Issue Date & Issue Description By Check MERLONE GEIER PARTNERS 425 CALIFORNIA ST. 11TH FLOOR SAN FRANCISCO, CA 94104 CONTACT: DAVID GEISER 415-693-9000 Project Name Project Number Description Scale MOUNTAIN VIEW, CA THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3 SITE PLAN - LEVEL 01 THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3 55.7739.000 AS INDICATED E1.00 ELECTRICAL SITE PHOTOMETRY PLAN SCALE: 1/16" = 1' - 0" ELECTRICAL SITE PHOTOMETRY PLAN 01 Manufacturer:
Proj Name: 1 of 1
858.638.0600 4770 Campus Drive Newport Beach, CA 92660 created:
Proj No: 2030XX SAN ANTONIO CENTER
06/30/2020
BEGA Luminaire Type
15' POST TOP LED PEDESTRIAN AREA LUMINAIRE WITH SYMMETRICAL LIGHT DISTRIBUTION AND DIE-CAST ALUMINUM HOUSING.
S01
Page
Manufacturer:Proj Name: 1 of 3
858.638.0600 4770 Campus Drive Newport Beach, CA 92660 created:
Proj No: 2030XX SAN ANTONIO CENTER
06/30/2020
GOTHAM Luminaire Type
4" DIAMETER APERTURE SURFACE MOUNTED LED DOWNLIGHT WITH HEAVY-GAUGE
ALUMINUM CONSTRUCTION AND MATTE DIFFUSE REFLECTOR FOR WIDE BEAM ANGLE DISTRIBUTION. UL LISTED FOR WET LOCATION USE WITH COVERED CEILINGS.
S02
Page
Manufacturer:Proj Name: 2 of 3
858.638.0600 4770 Campus Drive Newport Beach, CA 92660 created:
Proj No: 2030XX SAN ANTONIO CENTER
06/30/2020
GOTHAM Luminaire Type
4" DIAMETER APERTURE SURFACE MOUNTED LED DOWNLIGHT WITH HEAVY-GAUGE
ALUMINUM CONSTRUCTION AND MATTE DIFFUSE REFLECTOR FOR WIDE BEAM ANGLE DISTRIBUTION. UL LISTED FOR WET LOCATION USE WITH COVERED CEILINGS.
S02
Page
Manufacturer:Proj Name: 3 of 3
858.638.0600 4770 Campus Drive Newport Beach, CA 92660 created:
Proj No: 2030XX SAN ANTONIO CENTER
06/30/2020
GOTHAM Luminaire Type
4" DIAMETER APERTURE SURFACE MOUNTED LED DOWNLIGHT WITH HEAVY-GAUGE
ALUMINUM CONSTRUCTION AND MATTE DIFFUSE REFLECTOR FOR WIDE BEAM ANGLE DISTRIBUTION. UL LISTED FOR WET LOCATION USE WITH COVERED CEILINGS.
S02
Page
Manufacturer:Proj Name: 1 of 2
858.638.0600 4770 Campus Drive Newport Beach, CA 92660 created:
Proj No: 2030XX SAN ANTONIO CENTER
06/30/2020
FOCAL POINT Luminaire Type
4" APERTURE RECESSED LINEAR LED LUMINAIRE WITH EXTRUDED ALUMINUM HOUSING AND FLUSH SATIN ACRYLIC LENS. UL LISTED FOR WET LOCATION USE. LENGTH AS INDICATED PER PLANS.
S03
Page
Manufacturer:Proj Name: 2 of 2
858.638.0600 4770 Campus Drive Newport Beach, CA 92660 created:
Proj No: 2030XX SAN ANTONIO CENTER
06/30/2020
FOCAL POINT Luminaire Type
4" APERTURE RECESSED LINEAR LED LUMINAIRE WITH EXTRUDED ALUMINUM HOUSING AND FLUSH SATIN ACRYLIC LENS. UL LISTED FOR WET LOCATION USE. LENGTH AS INDICATED PER PLANS.
S03
Page
8425 CALIFORNIA ST. 11TH FLOOR SAN FRANCISCO, CA 94104 CONTACT: DAVID GEISER 415-693-9000 MOUNTAIN VIEW, CA THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3 425 CALIFORNIA ST. 11TH FLOOR SAN FRANCISCO, CA 94104 CONTACT: DAVID GEISER 415-693-9000 MOUNTAIN VIEW, CA THE VILLAGE AT SAN ANTONIO CENTER - BLOCK 3 LIGHTING CUT SHEETS 07.19.2021 - PLANNING SUBMITTAL 5 09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7 Gensler
225 Broadway
Suite 100
San Diego CA 92101
Tel: 619.557.2500
Fax:
619.557.2520
© 2020 Gensler
Seal/Signature
Issue Date & Issue Description By Check
425 CALIFORNIA ST. 11TH FLOOR
SAN FRANCISCO, CA 94104
CONTACT: DAVID GEISER
415-693-9000
Project Name
Project Number
Description
Scale
365 SAN ANTONIO ROAD,
MOUNTAIN VIEW, CA
THE VILLAGE AT SAN
ANTONIO CENTER - PHASE 3
02.20.2020 - PLANNING SUBMITTAL 1
07.10.2020 - PLANNING SUBMITTAL 2
10.07.2020 - PLANNING SUBMITTAL 3
05.05.2021 - PLANNING SUBMITTAL 4
NOT FOR
CONSTRUCTION
FOR
REFERENCE
ONLY
I00.04
SOLAR STUDIES
055.7739.000
SAVN | BLOCK III
VERNAL EQUINOX
MARCH 20TH
9AM 12PM 3PM
SUMMER SOLSTICE
JUNE 20TH
9AM 12PM 3PM
AUTUMNAL EQUINOX
SEPTEMBER 20TH
9AM 12PM 3PM
WINTER SOLSTICE
DECEMBER 20TH
9AM 12PM 3PM
PROPOSED
BUILDING
PROPOSED
BUILDING
PROPOSED
BUILDING
PROPOSED
BUILDING
PROPOSED
BUILDING
PROPOSED
BUILDING
PROPOSED
BUILDING
PROPOSED
BUILDING
PROPOSED
BUILDING
PROPOSED
BUILDING
PROPOSED
BUILDING
PROPOSED
BUILDING
2 05.05.2021 -planning
submittal 4
07.19.2021 - PLANNING SUBMITTAL 5
09.27.2021 - PLANNING SUBMITTAL 6 10.29.2021 - PLANNING SUBMITTAL 7