DATE:

February 10, 2026
CATEGORY:

Consent
DEPT.:

Public Works Department

TITLE: Transit Center Grade Separation and
Access Project (Castro and Evelyn
Improvements), Project 21-35–Design
Concept

RECOMMENDATION

1. Approve the design concept for the Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35.

2. Amend Transit Center Grade Separation and Access Project, Project 21-35 title to Castro and Evelyn Bicycle and Pedestrian Improvements, Project 21-35.

BACKGROUND

Grade-separating Castro Street from the railroad crossing has been a long -term City goal to improve traffic safety, pedestrian and bicycle safety and access, traffic flow, railroad operational safety, and traffic movement along all adjacent streets and int ersections surrounding the crossings. The Castro Grade Separation project is a high priority project for the City as the at - grade crossings of the Caltrain railway are a barrier to convenient pedestrian and bicycle travel and contribute to significant delays to adjacent streets.

The grade separation project removes the interface between rail operations and pedestrian, bicycle, and vehicle movements occurring currently and improves safety for all users. The City Council approved the concept of grade separation in 2017 as part of the Transit Center Masterplan. Since then, the Transit Center Grade Separation and Access Project, Project 21 -35 (Castro Grade Separation) has been separated as its own discrete project.

The Preliminary Engineering Design (35% Design) and Environmental Clearance began in February 2018. City Council approved a California Environmental Act (CEQA) Mitigation Negative Declaration the project in December 2019 and the preliminary engineering de sign phase was completed in February 2021.

The project final design (65% design) started in 2022 with Caltrain as lead agency, City of Mountain View as the project sponsor, and Santa Clara Valley Transportation Authority (VTA) as the funding partner providing 2016 Measure B funding and lending technical oversight. In

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 2 of 20 ends

September 2023, at the 65% design milestone , the City received the updated project cost from the Construction Management/General Contractor (CMGC) for the Castro Project which was significantly higher than the construction cost provided at the 35% design stage. The construction cost estimate, in particular the undercrossing structures and vertical circulation elements, had been grossly underestimated by the Caltrain design team resulting in the project cost estimate doubling from $136 million to $271 million (in 2023 dollars).

The concept for the project is shown in Figure 1, below.

Figure 1: Castro Street Grade Separation Project Layout and Elements

The Rengstorff Grade Separation Project was progressing in parallel to Castro Grade Separation and experienced similar unexpected cost escalations. Therefore, on January 23, 2024, in a Study Session, the City Council received an update on the status and cost estimates for both the Castro Street and Rengstorff Avenue grade separation projects. Council selected to prioritize the Rengstorff Grade Separation Project and to move forward with a more narrowly scoped project for the Castro Street rail crossing, initially referred to as the Castro Interim Improvements Project.

Council directed that this new narrower project eliminate the existing vehicle at -grade crossing while enhancing the existing pedestrian and bicycle at-grade crossings. (As described later in this report, staff is proposing a name change from Castro Interim Improvements to Castro and Evelyn Bicycle and Pedestrian Improvements.)

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 3 of 20 ends

Staff has been working with Caltrain and VTA on review of the 35% submittal for the Castro Interim Improvements Project, received in June 2025.

Castro Pedestrian Mall

In June 2020, in the midst of the COVID -19 pandemic, the City implemented the Castro StrEATS program. This program was launched to facilitate outdoor dining within the Castro Street public right-of-way, allow for social distancing, and support the recovery of Mountain View’s downtown businesses as a result of the pandemic. The pedestrian mall program has been revised several times since, with the 100, 200, and 300 blocks of Castro Street now permanently closed to vehicle traffic and serving as a pedestrian mall and outdoor dining location.

To properly implement the Castro StrEATS program and pedestrian mall, temporary signage and fencing was put up along Central Expressway and Moffett Boulevard to prohibit vehicle movements and queuing at the rail-crossing heading southbound on Castro to Evelyn Avenue.

Attachment 1 provides additional background on the Transit Center Grade Separation and Access Project and the Castro Pedestrian Mall.

ANALYSIS

Castro Street, including the Evelyn Avenue crossing at Castro Street, is a critical gateway to the downtown and for accessing the Mountain View Transit Center. The Transit Center provides multi-modal access to the regional transportation network for the City’s residents , and a key transfer point for employees in Mountain View and the greater Silicon Valley area. The existing crossing at Evelyn Avenue and Castro Street experiences heavy pedestrian and bicycle traffic, with more than 800 bicyclists and over 1,700 pedestrians crossing the railroad tracks each day over a 24-hour period (see Table 1 for detailed data on AM Peak, PM Peak, and 24-Hour counts).

Table 1: Rail Crossing Counts on September 9, 2025

Southbound Northbound Combined
Bikes Peds Bikes Peds Bikes Peds
AM Peak
(8:30-9:30 AM) 33 68 80 35 113 103
PM Peak
(6:45- 7:45 PM) 29 105 35 123 64 228
24-Hour Count 402 855 470 930 872 1785

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 4 of 20 ends

The Castro and Evelyn Pedestrian and Bicycle Improvements Project (Project) will eliminate the vehicle at -grade crossing of the Caltrain tracks at Castro Street . The Project will also provide bicycles and pedestrians a safer crossing of the rail corridor and Central Expressway through the enhanced at-grade rail crossing and will improve access to downtown and the Transit Center.

Project Scope

The Project will permanently close the rail crossing to vehicles while retaining an at -grade crossing for pedestrians and bicyclists. To accommodate the vehicle closure and provide for safe vehicle, bicycle, and pedestrian circulation , new improvements will be installed in the following segments (see Figure 2):

• Segment 1 - Evelyn Avenue between Hope Street and Bryant Avenue;

• Segment 2 - Moffett Boulevard between Central Expressway and Jackson Street; and

• Segment 3 - Castro Street/Evelyn Avenue/rail crossing.

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 5 of 20 ends

Figure 2: Project Limits

The detailed discussion of the elements of the Project are below and presented as follows:

• Discussion of each of the three segments providing concept design information;

• Discussion and maps of pedestrian and bicycle circulation; and

• Discussion and map of vehicle circulation.

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 6 of 20 ends

Segment 1 - Evelyn Avenue between Hope Street and Bryant Street

As the southbound Castro Street vehicular access is already restricted, the Project will eliminate the northbound vehicle crossing on Castro Street . T he existing west -bound traffic on Evelyn Avenue, from Hope Street to Castro Street, will be routed to Evelyn Avenue, west of Castro Street.

This connection will provide a single -lane, westbound -only access for vehicles, and dual directional access for bicy clists between Hope Street and Wild Cherry Lane (Figures 3 -5). The design speed for this single-lane road segment will be 15 mph.

Access to the 100 and 200 blocks of Downtown Mountain View will be from Villa Street which is one block to the south of Evelyn Avenue and provides convenient access.

The following sections provide additional details for the improvements at three locations within Segment 1: Evelyn Avenue East of Castro Street, Evelyn Avenue at Castro Street, and Evelyn Avenue West of Castro Street.

Evelyn Avenue East of Castro Street

Along Evelyn Avenue east of Castro Street (Hope Street to Castro Street), the project will install a Class 2 buffered bike lane on the north side of Evelyn Avenue (westbound) between Hope Street and Castro Street (see yellow in Figure 3). A Class 4 separat ed bikeway will be installed on the south side of Evelyn Avenue (eastbound) between Hope Street and Castro Street (see orange in Figure 3). The bike lane improvements in this section will result in elimination of two parking spaces along Evelyn Avenue.

In addition, the traffic signal at the Evelyn Avenue and Hope Street intersection will be modified to accommodate the elimination of the eastbound vehicular traffic between Castro Street and Hope Street (see blue traffic signal in Figure 3).

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 7 of 20 ends

Figure 3: Evelyn Avenue Improvements East of Castro Street

Evelyn Avenue at Castro Street

The improvements on Evelyn Avenue at Castro Street include installation of Class 2 buffered bike lane on the north side of Evelyn Avenue that transitions to a Class 3 bicycle route west of Castro Street for westbound bicyclists (see yellow in Figure 4) and Cla ss 4 separated bikeway on the southside of Evelyn Avenue for eastbound bicyclists (see orange in Figure 4).

Landscaping will be installed on the north side of Evelyn Avenue and west side of Castro Street (see green in Figure 4). On the west side, landscaping will include trees in planter boxes. The landscape area on the north side of Evelyn will include green stormwater infrastructure. These landscaped areas will not only serve to enhance the area but also channelize pedestrian traffic to the marked crossings.

The two pedestrian crossings on both sides of Castro Street will be replaced in a similar location and will be upgraded with Americans with Disabilities Act (ADA) -compliant curb ramps, pedestrian crossing signage, high-visibility crosswalks and street ligh ting (see magenta in Figure 4).

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 8 of 20 ends

Figure 4: Evelyn Avenue Improvements at Castro Street

Evelyn Avenue West of Castro Street

Along Evelyn Avenue west of Castro Street (Castro Street to Bryant Street), Class 3 bicycle route markings will be installed on the north side of Evelyn Avenue between Castro Street and Wild Cherry Lane for westbound bicyclists (see yellow in Figure 5). A Class 4 separate bikeway will be installed on the south side of Evelyn Avenue for eastbound bicyclists between Castro Street and Wild Cherry Lane (see orange in Figure 5). The bike lane improvements in this section will result in elimination of 10 parking spaces along Evelyn Avenue.

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 9 of 20 ends

Figure 5: Evelyn Avenue Improvements West of Castro Street

Segment 2 - Moffett Boulevard between Central Expressway and Jackson Street

The following sections provide additional details for the improvements at two locations within Segment 2: Moffett Boulevard at Central Expressway and Moffett Boulevard between Central Expressway and Jackson Street.

Moffett Boulevard Improvements at Central Expressway

The Project will convert the intersection of Moffett Boulevard and Central Expressway to a T - intersection, eliminating the southern leg of the intersection, as vehicle access at the rail crossing will be eliminated. The Moffett Boulevard/Central Expressway intersection will require traffic signal modifications to allow the intersection to operate as a T-intersection (see blue traffic signal in Figure 6).

The intersection traffic signal modification will eliminate signal elements related to the rail preemption, which is a safety system that uses interconnected railroad equipment to control nearby traffic signals to clear vehicles from a railroad crossing an d prevent them from being on the tracks when a train passes. The current signal preemption can create very long wait times for pedestrians and bicyclists to cross Central Expressway as they must wait for the train to clear and the signal to cycle back for crossing Central Expressway. Elimination of railroad preemption will reduce pedestrian crossing wait times at Central Expressway as vehicles, bicyclists and pedestrians will no longer be impacted by gate downtimes as trains cross Castro Street.

The Project will also refresh the Central Expressway crosswalks and install new ADA- compliant curb ramps on the south side of Central Expressway (see magenta in Figure 6). Additionally, green

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 10 of 20 ends

bike lane striping and bicycle ramps will be installed for bicyclists crossing the intersection (see orange in Figure 6).

Figure 6: Moffett Boulevard Improvements at Central Expressway

Moffett Boulevard between Central Expressway and Jackson Street

A portion of the existing Class 2 bike lane for southbound Moffett Boulevard will be converted to a Class 4 separated bikeway utilizing the existing southbound vehicle lanes which are currently closed due to the Castro StrEATS program (see yellow in Figure 7). No modifications are proposed to the northbound traffic and bicycle facilities on Moffett Boulevard north of Central Expressway.

Improvements on Moffett Boulevard north of Central Expressway will be modified in the future as the Moffett Boulevard Precise Plan is currently in development and will include recommended street cross sections for Moffett Boulevard north of Central Expressway.

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 11 of 20 ends

Figure 7: Moffett Boulevard Improvements Between Central Expressway and Jackson Street

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 12 of 20 ends

Segment 3 - Rail Crossing at Castro Street/Evelyn Avenue

Segment 3 of the Project will improve safety at the railroad crossing by eliminating the existing northbound vehicular access at Castro Street and combining the two existing at-grade pedestrian crossings into one wider bicycle/pedestrian crossing (see magenta in Figure 8) . Caltrain’s evaluation concluded that maintaining one at- grade bicycle/pedestrian rail crossing improves safety as it presents fewer conflict points.

The proposed improvements at this location are illustrated in Figure 8 and include:

• Removal of crossing gates and railroad signals on Castro Street (shown in red); • Removal of roadway asphalt concrete and concrete track panels to increase the pervious surface area (shown in red);
• Widening of the existing easterly pedestrian at -grade crossing from 10 feet to 15 feet (shown in magenta);
• Installation of curb, gutter, and concrete surfacing on Castro Street at its connection to the Moffett Boulevard/Central Expressway intersection to restrict vehicle access , replacing temporary fencing currently in place (shown in blue); • Installation of decorative fencing along the Caltrain tracks and right -of-way to enhance safety (see green lines); and
• Upgrades to street lighting to improve nighttime visibility (shown in yellow).

Staff is currently exploring the feasibility of adding landscaping at this location along Central Expressway to further enhance the pedestrian experience.

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 13 of 20 ends

Figure 8: Rail Crossing Improvements at Castro Street/Evelyn Avenue

Pedestrian and Bicycle Circulation

The improvements will enhance the pedestrian and bicycle experience by reducing wait times at Central Expressway and minimizing conflict points at the railroad crossing. As illustrated in Figure 9, these changes will result in a minor adjustment to pedestrian and bicycle circulation.

Specifically, the elimination of the at-grade pedestrian rail crossing on the west side of the Castro Street/rail intersection will add a short distance to the travel path from the westside of Central Expressway intersection.

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 14 of 20 ends

Figure 9: Pedestrian and Bicycle Circulation Across Railroad Tracks

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 15 of 20 ends

Vehicle Circulation

As a result of the previously noted changes , westbound vehicles on Evelyn Avenue heading northbound to access Moffett Boulevard , will be routed to Villa Street through either Bryant Street or Franklin Street. From Villa Street, vehicles will use Shoreline Boulevard to connect to Central Expressway to head northbound on Moffett Boulevard, as illustrated in yellow in Figure

10. Similarly, southbound vehicles originating from the north heading into the Transit Center or downtown will follow the current route and will have access via Shoreline Boulevard, Villa Street, and Hope Street, as illustrated in blue in Figure 10.

Figure 10: Vehicle Circulation

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 16 of 20 ends

Bicycle and Pedestrian Advisory Committee

On November 17, 2025, staff presented the design concept to the Bicycle/Pedestrian Advisory Committee (BPAC). The BPAC supported the proposed improvements along all three segments and made a motion to request the Council Transportation Committee (CTC) have staff convey community desire to keep both pedestrian crossings at the Caltrain Right- of-Way. In addition to the motion, the BPAC provided the following feedback for consideration:

• Anticipate high pedestrian and bicyclist counts to accommodate future multi -family housing within a half mile radius of transit;
• Convert the easterly crossing on Evelyn to a diagonal crossing; • Remove parking between Wild Cherry Lane and Castro in favor of extending the class IV bike lane on the north side of Evelyn Avenue;
• Conduct a walk audit with design team and the public; • Add improvements to the northbound Moffett Boulevard bike lane north of Central Expressway;
• Add a bicycle ramp near the easterly crossing on Evelyn Avenue; • Add signals at the two Evelyn Avenue crossings; and
• Add bollards on the southside of Central Expressway.

Council Transportation Committee

On December 2, 2025, staff presented the design concept to the CTC, including feedback received from the BPAC . The CTC recommended City Council approve the staff recommended design concept for Castro and Evelyn Improvements, Project 21 -35 and provided the following additional feedback:

• Explore gateway elements that create a more cohesive, attractive, and pedestrian - oriented environment, recognizing that the improvements will be in place long term;

• Provide additional detail on pedestrian and bicycle counts at the rail crossing (see Table 1);

• Minimize removal of parking spaces along Evelyn Avenue; and

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 17 of 20 ends

• Coordinate with Santa Clara County to evaluate a potential “ no right on red ” from westbound Central Expressway onto Moffett Boulevard.

Staff will thoughtfully review and consider the feedback provided by both BPAC and the CTC. To the extent feasible, staff will work to incorporate relevant elements of this feedback while maintaining alignment with the project scope, timeline, and key deliverables.

Since the CTC meeting on December 2, 2025, staff has communicated with Caltrain regarding the request to keep both pedestrian crossings. Caltrain will not support maintaining a second westerly crossing for the following reasons:

• Risk and Violation Reductions : Eliminating the westerly crossing reduces conflict points and lowers the risk of train -pedestrian and train -bicyclist collisions and those users bypassing gate arms;

• System Reliability and Redundancy Elimination : Reducing the number of crossings reduces system complexity, likelihood of equipment malfunctions , and eliminates redundancy;

• Industry Best Practice: Consolidating crossings into a single, wider, enhanced crossing aligns with industry best practices and improves safety and capacity; and

• Operations and Maintenance Efficiency: A single crossing reduces ongoing inspection, maintenance, and repair costs.

Per Caltrain final decision, only one crossing will be incorporated in the final design.

Next Steps

If the recommended actions are approved by Council, final design for the Castro and Evelyn Bicycle Improvements Project will be completed in fall 2026. As with the design phase, Caltrain will lead delivery of the construction phase and will follow its established procedures for approving project plans, authorizing advertisement, and awarding the construction contract.

Staff will return to City Council at a future date to recommend approval of a cooperative agreement with Caltrain to implement the construction phase of the project which is anticipated to begin in spring 2027.

Project Title Change

When the Castro Grade Separation project scope was discussed and narrowed due to cost escalations and funding challenges, s taff initially referred to the newly scoped project as the Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 18 of 20 ends

Castro Interim Improvements to indicate that the proposed improvements were intended to be temporary and would be modified as part of a future Castro Grade Separation project. However, given the uncertainty surrounding the funding availability and construction timeline for the grade separation project, the term “interim” may create confusion regarding the intended longevity and purpose of the improvements. To provide greater clarity and more accurately reflect the project scope, staff proposes renaming the project the Castro and Evel yn Bicycle and Pedestrian Improvements. This amended title better communicates the project’s intent as a standalone effort, independent of the future grade separation project.

FISCAL IMPACT

Project 21-35 is funded through final design utilizing 2016 VTA Measure B funds provided under the cooperative agreement for the Castro Street Grade Separation Project. The cooperative agreement funds are limited to the project's design phase.

In addition, the project is funded with $6.2 million from the Transportation Reserve Fund as the City’s required matching contribution for the VTA Measure B funds . These funds are being used for the construction phase of the project, which is currently estimated to cost approximately $4.2 million.

The project has sufficient funding to complete design and construct the project upon completion of design. There is sufficient funding in the project budget for the recommended action, and no additional appropriation is requested at this time.

LEVINE ACT

California Government Code Section 84308 (also known as the Levine Act) prohibits city officials from participating in any proceeding involving a “license, permit, or other entitlement for use” if the official has received a campaign contribution exceeding $500 from a party, participant, or agent of a party or participant within the last 12 months. The Levine Act is intended to prevent financial influence on decisions that affect specific, identifiable persons or participants. For more Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 19 of 20 ends

information see the Fair Political Practices Commission website: www.fppc.ca.gov/learn/pay-to- play-limits-and-prohibitions.html

Please see below for information about whether the recommended action for this agenda item is subject to or exempt from the Levine Act.

EXEMPT FROM THE LEVINE ACT
☒ General policy and legislative actions

CONCLUSION

Transit Center Grade Separation and Access Project (Castro and Evelyn Bicycle and Pedestrian Improvements), Project 21-35, design concept offers a safety -focused and cost- effective near- term solution for enhancing pedestrian and bicyclist safety at the Castro Street rail crossing, particularly in light of the significant cost escalation associated with the Transit Center Grade Separation and Access Project. The recommended improvements will enhance safety and efficiency for people walking and biking through upgraded ADA-compliant curb ramps, protected bikeways, improved lighting, and reduced train-related delays.

With funding in place through final design and construction, the project is expected to begin construction in spring 2027 following completion of design in fall 2026. Staff recommends approval of the design concept for the project and renaming the project to the Castro and Evelyn Bicycle and Pedestrian Improvements.

ALTERNATIVES

1. Do not approve the design concept for the Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements) , Project 21 -35, and direct staff to modify the concept design.

2. Do not amend the project title to Castro and Evelyn Bicycle and Pedestrian Improvements, Project 21-35 and direct staff to use a different title.

3. Provide other direction.

Transit Center Grade Separation and Access Project (Castro and Evelyn Improvements), Project 21-35–Design Concept
February 10, 2026

Page 20 of 20 ends

PUBLIC NOTICING

In addition to the City’s standard agenda and posting requirements notices were mailed to residents and property owners within 750 feet of the project area and distributed to neighborhood associations, downtown businesses, persons who have signed up for project updates, representatives of VTA, Caltrain and other interested parties.

Prepared by:

Joy Houghton
Senior Civil Engineer

Reviewed by:

Robert Gonzales
Principal Civil Engineer

Edward Arango
Assistant Public Works Director/
City Engineer
Approved by:

Jennifer Ng
Public Works Director

Audrey D. Seymour
Assistant City Manager