1ST - 5TH SUBMITTAL DATES: 12.12.2023 / 01.19.2024 / 08.27.2024/10.25.24/1.24.2025
ARBOR SQUARE
922-950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CALIFORNIA 94043
APN: 153-18-026 & 153-18-031
APPLICANT:
CITY VENTURES
1185 MASON STREET
SAN FRANCISCO, CA 94123
CONTACT: KIAN MALEK
DIRECTOR OF DEVELOPMENT
PHONE: 650.248.8388
E-MAIL: [email protected]
WWW.CITYVENTURES.COM
ARCHITECT:
HUNT HALE JONES ARCHITECTS
444 SPEAR STREET, SUITE 105
SAN FRANCISCO, CA 94105
CONTACT: DAN HALE
Architect
PHONE: 415.568.3833
E-MAIL: [email protected]
www.hunthalejones.com
CIVIL ENGINEER:
CSW_ST2
5870 STONERIDGE MALL ROAD, SUITE 203
PLEASANTON, CA 94588
CONTACT: MICHAEL VIDRA
Project Manager
PHONE: 925.7874982
E-MAIL: [email protected]
www.cswst2.com
LANDSCAPE ARCHITECT:
C2 COLLABORATIVE
100 AVENIDA MIRAMAR
SAN CLEMENTE, CA 92672
CONTACT: CHRIS FORTUNATO
Vice President
PHONE: 949.542.7703
E-MAIL: [email protected]
www.c2collaborative.com
UTILITY CONSULTANTS:
TARRAR
813 FIRST ST.
BRENTWOOD, CA 94513
CONTACT: ALFONSO REYES
Senior Project Manager
PHONE: 949.240.2595
E-MAIL: [email protected]
www.tarrar.com
GEOTECHNICAL ENGINEER:
QUANTUM GEOTECHNICAL
1110 BURBETT AVE., SUITE B
CONCORD, CA 94520
CONTACT: SIMON MAKDESSI
President
PHONE: 925.788.2751
E-MAIL: [email protected]
6TH SUBMITTAL DATE: 6.20.2025
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Cover\317074_CS.dwg, CS - COVER SHEET, 1/28/2026 9:54:59 AM, 02/16/2024 - PROGRESS SET Attachment 7
A3.2.4 - BLDGS. B & C _CONCEPTUAL ROOF PLAN
A3.2.5 - BLDGS. B & C _CONCEPTUAL ELEVATIONS
A3.3.1 - CONCEPTUAL TRASH ENCLOSURE PLANS
A3.3.2 - CONCEPTUAL TRASH ENLOSURE DATA
SUPPORTING MATERIAL
A4.1.1 - CONCEPTUAL WALL SECTIONS
A4.1.2 - CONCEPTUAL ARCHITECTURAL DETAILS
A4.1.3 - CONCEPTUAL ARCHITECTURAL DETAILS
A4.1.4 - CONCEPTUAL ARCHITECTURAL DETAILS
A4.1.5 - CONCEPTUAL ARCHITECTURAL DETAILS
A4.1.6 - GREENPOINT CHECKLIST
A4.1.7 - SHADOW STUDY
A4.1.8 - FIRE ACCESS - LADDER DIAGRAM
A4.1.9 - FIRE ACCESS LADDER PADS
LANDSCAPE ARCHITECTURE
L-1 CONCEPTUAL SITE PLAN
L-2 CONCEPTUAL DESIGN IMAGERY
L-3 CONCEPTUAL CIRCULATION PLAN
L-4 CONCEPTUAL WALL AND FENCE PLAN
L-5 CONCEPTUAL SITE AMENITIES
L-6 PRELIMINARY IRRIGATION PLAN
L-7 PRELIMINARY HYDROZONE PLAN
L-8 CONCEPTUAL CANOPY COVERAGE PLAN
L-9 PRELIMINARY PLANTING PLAN
L-10 PRELIMINARY PLANT IMAGERY
L-11 CONCEPTUAL PERSPECTIVES
CIVIL ENGINEERING
C1.0 TITLE SHEET
C2.0 EXISTING CONDITIONS AND DEMOLITION PLAN
C3.0 SITE PLAN
C4.0 CONCEPTUAL GRADING PLAN
C5.0 UTILITY PLAN
C6.0 STORMWATER MANAGEMENT PLAN
C7.0 FIRE ACCESS PLAN
C8.0 GARBAGE ACCESS PLAN
JOINT TRENCH
JT1 CONCEPTUAL JOINT TRENCH SITE PLAN
SL1 STREET LIGHTING GENERAL NOTES AND DETAILS
SL2 STREET LIGHTING GENERAL NOTES AND DETAILS
PE PHOTOMETRIC EXHIBIT
ARCHITECTURAL
CS - COVER SHEET
CS 2 - INDEX SHEET
SP1 - CONCEPTUAL CONTEXT MAP
SP2 - CONCEPTUAL SITE PLAN
PI1 - PHOTOREALISTIC IMAGES
PI2 - CONCEPTUAL SITE SECTIONS
PI3.1 - CONCEPTUAL MASSING MODEL IN SITE
PI3.2 - CONCEPTUAL MASSING MODEL
PI4 - BLDG. A_CONCEPTUAL ELEVATIONS
PI5 - BLDGS. D_CONCEPTUAL ELEVATIONS
PI6 - BLDGS. B & C_CONCEPTUAL ELEVATIONS
PI7 - CONCEPTUAL STREETSCAPE
PI8 - CONCEPTUAL CONTEXT MAP
PI9 - DESIGN SKETCHES
PI10 - DESIGN SKETCHES
PI11 - CONCEPTUAL MATERIAL AND COLOR SHEET_ BLDG. A
PI12 - CONCEPTUAL MATERIAL AND COLOR SHEET_ BLDG. D
PI13 - CONCEPTUAL MATERIAL AND COLOR SHEET_ BLDGS B & C
TECHNICAL DATA
GI 1 - UNIT AND BUILDING DATA
GI 2 - ZONING ANALYSIS AND PROJECT DATA
GI 3 - VICINITY MAP AND CONTEXT PHOTOS
GI 4 - NEIGHBORHOOD IMAGERY AND DETAILING
GI 5 - TRANSPORTATION CONTEXT MAPS
GI 6 - FAR CALCULATION
GI 7 - LOT COVERAGE
GI 8 - OPEN SPACE CALCULATION
GI 9 - BLDG CODE AND FLOOD MAP
UNIT PLANS
A2.1.1 - CONCEPTUAL PLAN 1-3 FP INT
A2.1.2 - CONCEPTUAL PLAN 1-3 END
A2.1.3 - CONCEPTUAL PLAN 2 ADA FLOOR PLANS
A2.3.1 - CONCEPTUAL PLAN 1- 4 FP
A2.3.2 - CONCEPTUAL PLAN 4 FP_ADA
A2.4.1 - CONCEPTUAL UNIT SECTIONS
BLDG PLANS
A3.1.1 - BLDGS. A & D _CONCEPTUAL GROUND FLOOR PLAN
A3.1.2 - BLDGS. A & D _CONCEPTUAL MAIN FLOOR PLAN
A3.1.3 - BLDGS. A & D _CONCEPTUAL UPPER FLOOR PLAN
A3.1.4 - BLDGS. A & D _CONCEPTUAL ROOF PLAN
A3.1.5 - BLDGS. A & D _CONCEPTUAL ELEVATIONS
A3.2.1 - BLDGS. B & C CONCEPTUAL GROUND FLOOR PLAN
A3.2.2 - BLDGS. B & C CONCEPTUAL MAIN FLOOR PLAN
A3.2.3 - BLDGS. B & C CONCEPTUAL UPPER FLOOR PLAN
SCALE:
INDEX SHEET
CS 2
NTS
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Cover\317074_CS.dwg, CS 2 - INDEX SHEET, 1/28/2026 9:55:05 AM, 02/16/2024 - PROGRESS SET SCALE:
CONCEPTUAL CONTEXT MAP
SP1
NTS
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\SP\317074_SP RENDERED.dwg, SP - Context, 1/28/2026 9:55:18 AM, 02/16/2024 - PROGRESS SET
PEDESTRIAN
SAFETY TRIANGLE
VEHICLE SAFETY
TRIANGLE
UP16 RISERS @ 7.75"
15 TREADS @ 10.5"
30x24 CLR
UP
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
UP16 RISERS @ 7.75"
15 TREADS @ 10.5"
3080
9070 SECT ROLL-UP
UP
2868
TILE/9'-1"
2040 SH
3068
CONC./9'-1"
UP16 RISERS @ 7.75"
15 TREADS @ 10.5"
30x24 CLR
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
212'-6"
344'-11"
20'-0"
SETBACK
44'-0"3'-0"21'-0"3'-0"42'-0"67'-4"42'-0"3'-0"44'-0" 21'-0"24'-71 2" 3'-0"
15'-0"
SETBACK
15'-0"
SETBACK
4'-101
2"
160'-4"
5'-0" SETBACK
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONECATV
SPACER
18'-8" 6'-6"
60'-4"
UP16 RISERS @ 7.75"
15 TREADS @ 10.5"
30x24 CLR
UP
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
UP16 RISERS @ 7.75"
15 TREADS @ 10.5"
3080
9070 SECT ROLL-UP
UP
2868
TILE/9'-1"
2040 SH
3068
CONC./9'-1"
UP16 RISERS @ 7.75"
15 TREADS @ 10.5"
30x24 CLR
15'-0"
45'-01
2"
9'-71
2"
0 10 20 8040
BLDG LEGEND
BLDG
X UNITS
BLDG NUMBER
TOTAL UNIT
GENERAL NOTE:
FOR ACCESSIBLE ROUTE AND GARBAGE TRUCK INFO SEE CIVIL DRAWING.
FOR BIKE PARKING INFO, SEE LANDSCAPE DRAWING.
DENSITY BONUS WAIVER USED FOR SETBACK REDUCTION
ADA UNIT NOTE:
10% OF THE TOTAL UNIT WILL BE ACCESSIBLE
· 38 TOTAL UNITS PROPOSED X 10% = 4 ACCESSIBLE UNITS
· INDICATES UNIT DESIGNATED ACCESSIBLE
2'-11
2"
7'-11
2"
214'-101
2"
15'-0"
SETBACK
4'-2"
160'-3"
5'-0" SETBACK21'-0" 7'-4"
47'-61
2"
2'-1"
7'-1"
345'-0"
20'-0"
SETBACK
44'-0"40'-6"44'-0"46'-4"44'-0"43'-10" 40'-71
2"19'-8"
15'-0"
SETBACK
27'-0"
61'-9"
145'-6" 6'-3"
BLDG D
10 UNITS
BLDG C
9 UNITS
BLDG B
9 UNITS
BLDG A
10 UNITS
SITE PLAN
22'-0"
TRASH ENCLOSURE
448 SQ. FT.
15 FT. UPPER LEVEL SETBACK
NORTHNORTH
P3 END
P1 INT
P3 INT
P1 INT
P1 INT
P3 INT
P1 INT
P3 INT
P1 INT
P4 END
P3 END
P1 INT
P3 INT
P1 INT
P1 INT
P3 INT
P1 INT
P3 INT
P1 INT
P4 END
BMR
P3 END
P1 INT
P3 INT
P1 INT
P2 INT
ADA
P3 INT
P1
P4 END
ADA
P3 END
P1 INT
P3 INT
P1 INT
P1 INT
P2 INT
ADA
P3 INT
P1
P4 END
ADA
SAN LEANDRO AVE
*
*
*
BMRBMR
BMRBMR
BMR BMR
BMR
BMRBMR
PI2
2 PI2
2 5'-0" TAKING BY CITY7'-0"
5'-0"
15'-0"
ZONING
SETBACK FOR
3-STORIES
1 23
4 5 6 7 8 91011 12 13 14
A2.1.5
1 A2.1.5
1 PROP. LINE
PROP. LINE
PROP. LINE
PROP. LINE
PROP. LINE
PROP. LINE
PROP. LINE
PROP. LINE
24'-71
2"
5'-3"
@ UPPER
LEVELS
24'-0"
25'-0"
EXISTING
25'-0"
5'-0" RIGHT OF WAY
DEDICATION
EASEMENT FOR PUBLIC
USE AS STREET AND PUBLIC UTILITIES
30'-0"
W/ DEDICTAION
VEHICLE SIGHT
TRIANGLE
PEDESTRIAN SIGHT
TRIANGLE
PROPOSED R.O.W.
AFTER DEDICATION
55'-0"
PROPOSED RIGHT OF WAY
EXISTING RIGHT OF
WAY
50'-0"
EXISTING RIGHT OF WAY
3 PARKING
STALLS
16'-0"
18'-0"
TYP.
5'-0"5'-0"5'-0"
9'-0"
TYP.
24'-0"
SUBSURFACE
TRANSFORMER
SUBSURFACE
TRANSFORMER
6'-0"
2'-8"
2 3
4 5
6 8
9 10
7 11
12 13
15 16
17 18
19 14
20 21
22 23
24 26
27 28
29 30
31 32
33 34
35 36
37 38 1
BLDG TYPES
RESIDENTIAL ROWHOUSE STYLE CONDOMINIUM
PROPOSED BMR - BELOW MARKET RATE LOCATION
*
P1 INT
25 *
*
**
**
*
*
*
*
SCALE:
CONCEPTUAL SITE PLAN
SP2
1:20
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\SP\317074_SP.dwg, SP - CAD, 1/28/2026 9:55:32 AM, 02/16/2024 - PROGRESS SET 922 -950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CALIFORNIA 94043
APN 153-18-026 & 153-18-031
THE PROJECT IS PRIVATELY FUNDED
ROWHOUSE DEVELOPMENT STANDARDS
REQUIRED PROPOSED
LOT SIZE 73,710.29 SF / 1.69 AC
GENERAL PLAN GENERAL INDUSTRY MEDIUM DENSITY RES.
(13-25 DU/ACRE
ZONING (MM) GENERAL INDUSTRY R3-1.5
ZONING DENSITY
73,710 - 15,500 (FIRST 5 UNITS)
= 58,210 : 1500 = 38.8066
38.80+5 = 43.80 UNITS MAX. =
25.6 UNITS PER ACRE
38 UNITS
22.48 DU/ACRE
GENERAL PLAN DENSITY
MEDIUM DENSITY GENERAL
PLAN ALLOWS FOR 13-25
UNITS PER ACRE
MAX UNITS = 43 UNITS
(1.69 ACRES X 25 DUA = 43)
38 UNITS
22.48 DUA<25 DUA
LOT WIDTH 100 FT MIN. 214' - 10"
LOT AREA 0.5 ACRES MIN. 1.69 ACRES /73,710 SQ.
FT.
HEIGHT LIMIT 45' MAX. ±39'
36' WALL HT. ±31' WALL HT.
SETBACKS
FRONT 15' 20' FOR BUILDING A
SIDE 15' FOR THREE STORIES
45' SOUTH
5' NORTH*
REAR 17' - 10"
AREA CALCULATIONS SEE
DIAGRAMS SHEETS G4-G7
SITE COVERAGE 35% MAX. = 0.35 X 73,710
=25,798.5 SQ. FT. MAX. 37.14% / 27,377*
FLOOR AREA RATIO 1.05 @DUA > 20 UNITS 1.06 SEE FOLLOWING DIAGRAMS*
OPEN AREA LANDSCAPE 35% MIN. = 25,798.5 SQ. FT. 40.16% = 29,603 SQ. FT.
COMMON OPEN SPACE
100 SQ.FT./UNIT MIN.
=3,800 SQ.FT.
W/ MIN 20 FT. DIM.
19,509 SQ.FT.
513 SQ.FT./UNIT
PRIVATE OPEN SPACE 100 SQ.FT./UNIT 338 SQ.FT. MIN./UNIT
PARKING SUMMARY
AUTOMOBILE PARKING
RESIDENTIAL PARKING
ALL 38 UNITS WITH MORE
THAN ONE OR MORE
BEDROOMS - 2 SPACES/UNIT
= 76 RES
76 RES. PROVIDED
TANDEM PARKING 50% MAX 19 TANDEM UNIT = 38
50% OF UNIT PKG
GUEST PARKING
0.3 SPACES /UNIT = 12
ONE SPACE PER 10 TANDEM =
19 10 = 2 SPACES
14 SPACES PROVIDED
TOTAL AUTO PARKING 76 UNIT / 14 GUEST = 90
BICYCLE PARKING
SECURE RES. PARKING 1/UNIT = 38 CLASS I SPACES 1/UNIT - SEE UNIT PLANS RESIDENTIAL GUEST 1 / 10 UNITS = 4 SPACES MIN. 4 PROVIDED SEE
LANDSCAPE PLANS
DRIVE ACCESS
ALLEY WAY 20FT CLEAR DRIVING AISLE 21 FT. PROVIDED
GAR. BACKOUT SPACE 24 FT. 24 FT. MIN. PROVIDED
DRIVEWAY APRONS MAX. 4 FT. VARIES 3FT. TYP. 11'-6"
MAX. *
PRIVATE STORAGE
164 CUBIC FT. / UNIT
ELEVATED IN GARAGE
ALLOWED
164 CUBIC FT. PROVIDED
ELEVATED IN GARAGE
SEE UNIT PLANS
TRASH AND RECYCLING OPAQUE SCREENED
ENCLOSURE
OPAQUE SCREENED
ENCLOSURE. SEE SITE
PLAN AND SHEET
STREET TREES MAX. 25 FT. ON AVERAGE SEE LANDSCAPE PLANS FENCE HEIGHT MAX. 3 FT. IN HEIGHT FACING
SAN LEANDRO STREET SEE LANDSCAPE PLANS
* STATE DENSITY BONUS WAIVER REQUESTED
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE:
ZONING ANALYSIS AND PROJECT DATA
GI 2
NTS
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Data and Zoning\317074_DATA - ZONING.dwg, ZONING ANALYSIS & PROJECT DATA_1, 1/28/2026 9:55:37 AM, 02/16/2024 - PROGRESS SET VIEW NO. 1 SITE LOCATION FROM SAN LEANDRO AVENUE
VIEW NO. 2 SITE LOCATION FROM SAN LEANDRO AVENUE
VIEW NO. 3 SITE LOCATION FROM SAN LEANDRO AVENUEVICINITY MAP
SITE LOCATION
1 2
3 SCALE:
VICINITY MAP AND CONTEXT PHOTOS
GI 3
NTS
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Cover\317074_CS.dwg, VICINITY MAP AND CONTEXT PHOTOS, 1/28/2026 9:56:10 AM, 02/16/2024 - PROGRESS SET 7 - PANELIZED WINDOW TREATMENT 8 - TRELLIS BAND5- GABLE TREATMENT AND WINDOW BOXES 1 - GABLE TREATMENT AND PICKET FENCING
6 - GABLE TREATMENT AND COLOR VARIATION
2 - GABLE END AND COLOR VARIATION 4 - GABLE TREATMENT AND GARAGE DOOR VARIATION3- GABLE TREATMENT / WINDOW BOXES AND COLOR VARIATION
NEIGHBORHOOD IMAGERY
· GABLE END TREATMENT VARIATIONS
·· SIDING CONTINUED TO TOP
·· BAND AT PLATE WITH ALTERNATE MATERIAL
·· PROJECTING GABLE FINISHES - PARTIAL AND FULL WIDTH
· WINDOW TREATMET VARIATIONS
·· PANELIZATION
·· WINDOW BOXES
· SPECAIL FEATURES
·· TRELLISES AND BANDS
· COLOR VARIATION
SCALE:
NEIGHBORHOOD IMAGERY AND DETAILING
GI 4
NTS
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Cover\317074_CS.dwg, NEIGHBORHOOD IMAGERY AND DETAILING, 1/28/2026 9:56:18 AM, 02/16/2024 - PROGRESS SET SITE
LOCATION
VICINITY MAP TRANSIT MAP BIKE MAP
1 2 MILE CIRCLE
SITE
LOCATION
SITE
LOCATION
SCALE:
TRANSPORTATION CONTEXT MAPS
GI 5
NTS
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Cover\317074_CS.dwg, TRANSPORTATION CONTEXT MAPS, 1/28/2026 9:56:27 AM, 02/16/2024 - PROGRESS SET FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
UP
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONECATV
SPACER
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
UP
BUILDING PLAN - GROUND
BLDG B&C
GRD:6371 SQ. FT.
BLDG A&D
GRD:7109 SQ. FT.
BLDG A&D
GRD:7109 SQ. FT.
SITE AREA:
73710 SQ. FT.
BLDG D
10 UNITS
BLDG C
9 UNITS
BLDG B
9 UNITS
BLDG A
10 UNITS
BLDG B&C
GRD:6371 SQ. FT.
FLOOR AREA RATIO
FAR MAX. 1.05
BUILDING A AREA
GROUND 7109 SQ. FT.
MAIN 6823 SQ. FT.
UPPER 6559 SQ. FT.
BUILDING B AREA
GROUND 6371 SQ. FT.
MAIN 6363 SQ. FT.
UPPER 5992 SQ. FT.
BUILDING C AREA
GROUND 6371 SQ. FT.
MAIN 6363 SQ. FT.
UPPER 5992 SQ. FT.
BUILDING C AREA
GROUND 7109 SQ. FT.
MAIN 6823 SQ. FT.
UPPER 6559 SQ. FT.
TOTAL BUILDING 78434 SQ. FT.
TOTAL SITE 73,710
FAR 78434/73710=1.06
SPECIAL NOTES:
· TWO GROUND FLOOR PORCHES ARE
OPEN ON 3 SIDES AND NOT INCLUDED
IN FAR CALCULATION - SEE DIAGRAM
· REMAINING PORCHES (OPEN ON 2
SIDE TYP.)TOTAL 5202 SQ. FT.
·· THESE PORCHES ARE
CONSIDERED TOWARD FAR AS
ENCLOSED SPACE
UP
DN
*3050 SH
30x24 CLR
T.P.
T.R.
T.H.
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
2468
2680
5068 BI-PASS
2468
2668
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
DECK
UP
DN
2040 SH
T.P.
30x24 CLR
T.H.
T.R.
5050 SL
K-2268-8MEMOIRS
LAVATORYFIRECLAY
2468
2468
DIN.
CPT./9'-1" PDR.
TILE/
CPT TILE
DECK
LIV.
CPT./9'-1"
KIT.
TILE/9'-1"
*3050 SH
3080 FR DR
3050 SH3050 SH
2020 AW
UP
DN
*4050 SL
30x24 CLR
T.P.
T.R.
T.H.
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
2468
2680
5068 BI-PASS
2468
2668
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
DECK
UP
DN
2040 SH
T.P.
30x24 CLR
T.H.
T.R.
5050 SL
K-2268-8MEMOIRSLAVATORYFIRECLAY
LC
2468
2468
LIV.
CPT./9'-1"
KIT.
TILE/9'-1"
DIN.
CPT./9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
PDR.
TILE/
16 RISERS @ 7.75"
15 TREADS @ 10.5"
4050 SL
LC
3080 FR DR
3050 SH
LC
3030 SH3030 SH
3080 FR. DR.
4050 SL
3050 SH
BASE
UP
DN
T.P.
2040 SH
2468
2468
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
3050 SH
30x24 CLR
T.R.
K-2268-8MEMOIRSLAVATORYFIRECLAY
UP
DN
3050 SH
*4050 SL
30x24 CLR
T.P.
T.R.
T.H.
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
2468
2680
5068 BI-PASS
2468
2668
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
DECK3080 FR DR
3050 SH
3050 SH 3050 SH
3050 SH
DECK
2040 SH 2040 SH
3050 SH
3050 SH 3050 SH
T.B.
T.B.
UP
DN
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
3050 SH
2468
2468
2668
3080 FR DR
3050 SH
DECK
2668
*5050 SL
UP
DN
*3050 SH
30x24 CLR
T.P.
T.R.
T.H.
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
2468
2680
5068 BI-PASS
2468
2668
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
DECK
UP
DN
2040 SH
T.P.
30x24 CLR
T.H.
T.R.
5050 SL
K-2268-8MEMOIRSLAVATORYFIRECLAY
2468
2468
DIN.
CPT./9'-1"
PDR.
TILE/
CPT TILE
DECK
LIV.
CPT./9'-1"
KIT.
TILE/9'-1"
*3050 SH
3080 FR DR
3050 SH 3050 SH
UP
DNT.P.
T.R.
T.H.
UP
DN
T.P.
30x24 CLR
T.H.
T.R.
K-2268-8MEMOIRS
LAVATORYFIRECLAY
CPT TILE
UP
DNT.P.
T.R.
T.H.
UP
DN
T.P.
30x24 CLR
T.H.
T.R.
K-2268-8MEMOIRSLAVATORYFIRECLAY
CPT TILE
UP
DN T.P.
30x24 CLR
T.R.
K-2268-8MEMOIRSLAVATORYFIRECLAY
UP
DNT.P.
T.R.
T.H.
UP
DN
30x24 CLR
T.P.
T.R.
T.H.
UP
DN
T.P.
30x24 CLR
T.H.
T.R.
K-2268-8MEMOIRSLAVATORYFIRECLAY
LC
16 RISERS @ 7.75"
15 TREADS @ 10.5"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
LC
LC
LC
LC
30x24 CLR
K-2268-8MEMOIRSLAVATORYFIRECLAY
CPT TILE
UP
DN T.P.
T.R.
T.H.
UP
DN
T.P.
30x24 CLR
T.H.
T.R.
K-2268-8MEMOIRSLAVATORYFIRECLAY
CPT TILE
UP
DN T.P.
T.R.
T.H.
UP
DN
T.P.
30x24 CLR
T.H.
T.R.
K-2268-8MEMOIRSLAVATORYFIRECLAY
CPTTILE
UP
DNT.P.
30x24 CLR
T.R.
K-2268-8MEMOIRSLAVATORYFIRECLAY
UP
DN T.P.
T.R.
T.H.
UP
DN
30x24 CLR
T.P.
T.R.
T.H.
UP
DN
T.P.
30x24 CLR
T.H.
T.R.
K-2268-8MEMOIRSLAVATORYFIRECLAY
LC
16 RISERS @ 7.75"
15 TREADS @ 10.5"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
LC
LC
LC
LC
30x24 CLR
K-2268-8MEMOIRSLAVATORYFIRECLAY
CPTTILE
UP
DN
*3050 SH
30x24 CLR
T.P.
T.R.
T.H.
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
2468
2680
5068 BI-PASS
2468
2668
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
DECK
UP
DN
2040 SH
T.P.
30x24 CLR
T.H.
T.R.
5050 SL
K-2268-8MEMOIRS
LAVATORYFIRECLAY
2468
2468
DIN.
CPT./9'-1"
PDR.
TILE/
CPT TILE
DECK
LIV.
CPT./9'-1"
KIT.
TILE/9'-1"
*3050 SH
3080 FR DR
3050 SH3050 SH
2020 AW
UP
DN
*4050 SL
30x24 CLR
T.P.
T.R.
T.H.
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
2468
2680
5068 BI-PASS
2468
2668
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
DECK
UP
DN
2040 SH
T.P.
30x24 CLR
T.H.
T.R.
5050 SL
K-2268-8MEMOIRSLAVATORYFIRECLAY
LC
2468
2468
LIV.
CPT./9'-1"
KIT.
TILE/9'-1"
DIN.
CPT./9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
PDR.
TILE/
16 RISERS @ 7.75"
15 TREADS @ 10.5"
4050 SL
LC
3080 FR DR
3050 SH
LC
3030 SH3030 SH
3080 FR. DR.
4050 SL
3050 SH
BASE
UP
DN
T.P.
2040 SH
2468
2468
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
3050 SH
30x24 CLR
T.R.
K-2268-8MEMOIRSLAVATORYFIRECLAY
UP
DN
3050 SH
*4050 SL
30x24 CLR
T.P.
T.R.
T.H.
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
2468
2680
5068 BI-PASS
2468
2668
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
DECK 3080 FR DR
3050 SH
3050 SH 3050 SH
3050 SH
DECK
2040 SH2040 SH
3050 SH
3050 SH3050 SH
T.B.
T.B.
UP
DN
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
3050 SH
2468
2468
2668
3080 FR DR
3050 SH
DECK
2668
*5050 SL
UP
DN
*3050 SH
30x24 CLR
T.P.
T.R.
T.H.
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
2468
2680
5068 BI-PASS
2468
2668
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
DECK
UP
DN
2040 SH
T.P.
30x24 CLR
T.H.
T.R.
5050 SL
K-2268-8MEMOIRSLAVATORYFIRECLAY
2468
2468
DIN.
CPT./9'-1"PDR.
TILE/
CPTTILE
DECK
LIV.
CPT./9'-1"
KIT.
TILE/9'-1"
*3050 SH
3080 FR DR
3050 SH 3050 SH
BUILDING PLAN - MAIN
BLDG B&C
MAIN:6363 SQ. FT.
BLDG B&C
MAIN:6363 SQ. FT.
BLDG A&D
MAIN:6823 SQ. FT.
BLDG A&D
MAIN:6823 SQ. FT.
BLDG D
10 UNITS
BLDG C
9 UNITS
BLDG B
9 UNITS
BLDG A
10 UNITS
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
2040 SH
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
2468 2668 2668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
T.P.
DN
*4050 SL
2040 SH
FX4DNF049
T.R.
T.R.
T.H.
T.R.
2050 SH
T.P.
30x24 CLR
T.H.
2040 SH
2680 OPEN
2468
2668 OPT
2668
2468
2880
2468
2668
5068 BI-PASS
2680
21080
BD.2
CPT./9'-1"
BTH.1
TILE/9'-1"
BTH.2
TILE/9'-1"
M.BD.
CPT./9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
30x24 CLR
2468
*4050 SL
*4050 SL
*3050 SH *3050 SH
2040 SH 2040 SH2040 SH
T.P.
30x24 CLR
DN
2680 OPEN
2468
2468
2668
2880
2468
2668
5068 BI-PASS
*4050 SL
2040 SH
2680
FX4DNF049
T.R.
T.H.
2040 SH2040 SH
30x24 CLR
2050 FX
T.R.T.H.
T.R.
T.P.
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
2668 OPT
21080
BTH.1
TILE/9'-1"
2468
LC
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
2040 SH
*4050 SL
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
2468
2668 2668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
5050 SL
*3050 SH *3050 SH
*3050 SH
*3050 SH
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
2040 SH
*4050 SL
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
2468
2668 2668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
*4050 SL
30x24 CLR
T.P.
30x24 CLR
*PR 3050 SH
FX4DNF049
DN
2040 SH
*4050 SL
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
2468
2668 2668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
DN
*5050 SL
*4050 SL
2040 SH
FX4DNF049
T.R.
T.R.
T.R.
T.P.
30x24 CLR
T.H.
2680 OPEN
2468
2668 OPT
2668
2880
2468
2668
5068 BI-PASS
2680
21080
TILE CPT.
TILE CPT.
CPT. TILE
BD.2
CPT./9'-1"
BTH.1
TILE/9'-1"
BTH.2
TILE/9'-1"
M.BD.
CPT./9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
LC
2468
T.P. T.H.
30x24 CLR
2468
30x24 CLR
T.P.
30x24 CLR
*PR 3050 SH
FX4DNF049
DN
2040 SH
*4050 SL
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
2468
2668 2668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
DN
*5050 SL
*4050 SL
2040 SH
FX4DNF049
T.R.
T.R.
T.R.
T.P.
30x24 CLR
T.H.
2680 OPEN
2468
2668 OPT
2668
2880
2468
2668
5068 BI-PASS
2680
21080
TILECPT.
TILECPT.
CPT.TILE
BD.2
CPT./9'-1"
BTH.1
TILE/9'-1"
BTH.2
TILE/9'-1"
M.BD.
CPT./9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
LC
2468
T.P. T.H.
30x24 CLR
2468
T.P.
30x24 CLR
DN
FX4DNF049
T.R.
T.H.
30x24 CLR T.R.T.H.
T.R.
T.P.
LC
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
T.H.
T.R.
T.H. T.R.
T.P.
+36"16 RISERS @ 7.75"
15 TREADS @ 10.5"
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
T.P.
DN
FX4DNF049
T.R.
T.R.
T.H.
T.R.
T.P.
30x24 CLR
T.H.
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
30x24 CLR
LC
LC LC
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
T.H.
T.R.
T.H.
T.R.
T.P.
+36"16 RISERS @ 7.75"
15 TREADS @ 10.5"
DN
FX4DNF049
T.R.
T.R.
T.R.
T.P.
30x24 CLR
T.H.
TILECPT.
TILECPT.
CPT.TILE
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
LC
T.P. T.H.
30x24 CLR
LC LC
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
T.H.
T.R.
T.H.
T.R.
T.P.
+36"16 RISERS @ 7.75"
15 TREADS @ 10.5"
DN
FX4DNF049
T.R.
T.R.
T.R.
T.P.
30x24 CLR
T.H.
TILECPT.
TILECPT.
CPT.TILE
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
LC
T.P. T.H.
30x24 CLR
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
T.H.
T.R.
T.H.
T.R.
T.P.
+36"16 RISERS @ 7.75"
15 TREADS @ 10.5"
DN
FX4DNF049
T.R.
T.R.
T.R.
T.P.
30x24 CLR
T.H.
TILE CPT.
TILE CPT.
CPT. TILE
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
LC
T.P. T.H.
30x24 CLR
T.P.
30x24 CLR
DN
FX4DNF049
T.R.
T.H.
30x24 CLRT.R. T.H.
T.R.
T.P.
LC
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
T.H.
T.R.
T.H.
T.R.
T.P.
+36" 16 RISERS @ 7.75"
15 TREADS @ 10.5"
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
T.P.DN
FX4DNF049
T.R.
T.R.
T.H.
T.R.
T.P.
30x24 CLR
T.H.
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
30x24 CLR
LC
LC LC
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
T.H.
T.R.
T.H.
T.R.
T.P.
+36" 16 RISERS @ 7.75"
15 TREADS @ 10.5"
DN
FX4DNF049
T.R.
T.R.
T.R.
T.P.
30x24 CLR
T.H.
TILECPT.
TILECPT.
CPT.TILE
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
LC
T.P.T.H.
30x24 CLR
LC LC
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
T.H.
T.R.
T.H.
T.R.
T.P.
+36" 16 RISERS @ 7.75"
15 TREADS @ 10.5"
DN
FX4DNF049
T.R.
T.R.
T.R.
T.P.
30x24 CLR
T.H.
TILECPT.
TILECPT.
CPT.TILE
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
LC
T.P.T.H.
30x24 CLR
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
T.H.
T.R.
T.H.
T.R.
T.P.
+36" 16 RISERS @ 7.75"
15 TREADS @ 10.5"
DN
FX4DNF049
T.R.
T.R.
T.R.
T.P.
30x24 CLR
T.H.
TILE CPT.
TILE CPT.
CPT. TILE
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
LC
T.P.T.H.
30x24 CLR
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
2040 SH
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
246826682668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
T.P.DN
*4050 SL
2040 SH
FX4DNF049
T.R.
T.R.
T.H.
T.R.
2050 SH
T.P.
30x24 CLR
T.H.
2040 SH
2680 OPEN
2468
2668 OPT
2668
2468
2880
2468
2668
5068 BI-PASS
2680
21080
BD.2
CPT./9'-1"
BTH.1
TILE/9'-1"
BTH.2
TILE/9'-1"
M.BD.
CPT./9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
30x24 CLR
2468
*4050 SL
*4050 SL
*3050 SH *3050 SH
2040 SH2040 SH 2040 SH
T.P.
30x24 CLR
DN
2680 OPEN
2468
2468
2668
2880
2468
2668
5068 BI-PASS
*4050 SL
2040 SH
2680
FX4DNF049
T.R.
T.H.
2040 SH 2040 SH
30x24 CLR
2050 FX
T.R. T.H.
T.R.
T.P.
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
2668 OPT
21080
BTH.1
TILE/9'-1"
2468
LC
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
2040 SH
*4050 SL
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
2468
26682668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
5050 SL
*3050 SH *3050 SH
*3050 SH
*3050 SH
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
2040 SH
*4050 SL
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
2468
26682668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
*4050 SL
30x24 CLR
T.P.
30x24 CLR
*PR 3050 SH
FX4DNF049
DN
2040 SH
*4050 SL
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
2468
26682668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
DN
*5050 SL
*4050 SL
2040 SH
FX4DNF049
T.R.
T.R.
T.R.
T.P.
30x24 CLR
T.H.
2680 OPEN
2468
2668 OPT
2668
2880
2468
2668
5068 BI-PASS
2680
21080
TILE CPT.
TILE CPT.
CPT. TILE
BD.2
CPT./9'-1"
BTH.1
TILE/9'-1"
BTH.2
TILE/9'-1"
M.BD.
CPT./9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
LC
2468
T.P.T.H.
30x24 CLR
2468
30x24 CLR
T.P.
30x24 CLR
*PR 3050 SH
FX4DNF049
DN
2040 SH
*4050 SL
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
2468
26682668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
DN
*5050 SL
*4050 SL
2040 SH
FX4DNF049
T.R.
T.R.
T.R.
T.P.
30x24 CLR
T.H.
2680 OPEN
2468
2668 OPT
2668
2880
2468
2668
5068 BI-PASS
2680
21080
TILECPT.
TILECPT.
CPT.TILE
BD.2
CPT./9'-1"
BTH.1
TILE/9'-1"
BTH.2
TILE/9'-1"
M.BD.
CPT./9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
LC
2468
T.P.T.H.
30x24 CLR
2468
BUILDING PLAN - UPPER
BUILDING PLAN - MAIN
BLDG B&C
UPPER:5992 SQ. FT.
BLDG B&C
UPPER:5992 SQ. FT.
BLDG A&D
UPPER:6559 SQ. FT.
BLDG A&D
UPPER:6559 SQ. FT.
BLDG D
10 UNITS
BLDG C
9 UNITS
BLDG B
9 UNITS
BLDG A
10 UNITS
SCALE:
FAR CALCULATION
GI 6
NTS
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\SP\317074_SP FAR.dwg, FAR CALCULATION, 1/28/2026 9:56:54 AM, 02/16/2024 - PROGRESS SET FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
UP
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONECATV
SPACER
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
UP
BUILDNG PLAN - GROUND - LOT COVERAGE
BLDG B&C
GRD:6371 SQ. FT.
BLDG B&C
GRD:6371 SQ. FT.
BLDG A&D
GRD:7109 SQ. FT.
BLDG A&D
GRD:7109 SQ. FT.
SITE AREA:
73710 SQ. FT.
BLDG D
10 UNITS
BLDG C
9 UNITS
BLDG B
9 UNITS
BLDG A
10 UNITS
TRASH ROOM
448 SQ. FT.
PORCHES WITH 3
OPEN SIDES
LOT COVERAGE
MAX. 35%
BUILDING A AREA
GROUND 7109 SQ. FT.
BUILDING B AREA
GROUND 6371 SQ. FT.
BUILDING C AREA
GROUND 6371 SQ. FT.
BUILDING C AREA
GROUND 7109 SQ. FT.
TRASH FACILITY 448 SQ. FT.
TOTAL BUILDING 27409 SQ. FT.
TOTAL SITE 73,710
LOT COVERAGE 27409/73710=0.3718
=37.18%
SPECIAL NOTES:
· TWO PORCHES ARE OPEN ON 3 SIDES
AND INCLUDED IN OPEN SPACE
CALCULATION - SEE DIAGRAM
· REMAINING PORCHES (OPEN ON 2
SIDE TYP.)TOTAL 5202 SQ. FT.
·· THESE PORCHES ARE
CONSIDERED TOWARD LOT
COVERAGE
SCALE:
LOT COVERAGE
GI 7
NTS
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\SP\317074_SP FAR.dwg, LOT COVERAGE, 1/28/2026 9:57:02 AM, 02/16/2024 - PROGRESS SET FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
3080
9070 SECT ROLL-UP
UP
2868ENT
TILE/9'-1"
2040 SH
3068
GAR W/ 9X40 TANDEM
CONC./9'-1"
PORCH
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONECATV
SPACER
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
3080
9070 SECT ROLL-UP
UP
2868ENT
TILE/9'-1"
2040 SH
3068
GAR W/ 9X40 TANDEM
CONC./9'-1"
PORCH
0 10 20 8040
BLDG D
10 UNITS
BLDG C
9 UNITS
BLDG B
9 UNITS
BLDG A
10 UNITS
OPEN AREA CALCULATIONS
15 FT. UPPER LEVEL SETBACK
NORTHNORTH
SAN LEANDRO STREET
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
3080
9070 SECT ROLL-UP
UP
2868ENT
TILE/9'-1"
2040 SH
3068
GAR W/ 9X40 TANDEM
CONC./9'-1"
PORCH
COMMON OPEN SPACE 3:
9,182 SQ. FT.
COMMON OPEN SPACE 1:
2653 SQ. FT.
BLDG. A PRIVATE OPEN SPACE:
2918 SQ. FT.
BLDG. B PRIVATE OPENSPACE:
2163 SQ. FT.
BLDG. D PRIVATE OPEN SPACE:
2862 SQ. FT.
BLDG. C PRIVATE OPENSPACE:
2152 SQ. FT.
COMMON OPEN SPACE 2:
7787 SQ. FT.
SUBSURFACE
TRANSFORMER NOT IN OPEN
SPACE CALCULATION
SUBSURFACE
TRANSFORMER NOT IN OPEN
SPACE CALCULATION
BLDG. A PRIVATE MAIN
OPEN SPACE:
749 SQ. FT.
BLDG. B PRIVATE MAIN OPEN
SPACE:
626 SQ. FT.
BLDG. D PRIVATE MAIN
OPEN SPACE:749 SQ. FT.
BLDG. C PRIVATE MAIN OPEN
SPACE:
626 SQ. FT.
LANDSCAPE OPEN AREA
LANDSCAPE OPEN AREA REQUIRED = 35% MIN.
= 0.35 X 73,710 = 25,798.5 SQ, FT.
= COMMON OPEN SPACE + PRIVATE OPEN SPACE
COMMON OPEN SPACE
100 SQ. FT. / UNIT REQ'D
= 3,800 SQ. FT.
AREA
COMMON OPEN SPACE 1 2653 SQ. FT.
COMMON OPEN SPACE 2 7787 SQ. FT.
COMMON OPEN SPACE 3 9070 SQ. FT.
TOTAL COMMON OPEN SPACE 19509 SQ. FT.
GROUND PRIVATE OPEN SPACE AREA
PRIVATE OPEN BUILDING A 2918 SQ. FT.
PRIVATE OPEN BUILDING B 2163 SQ. FT.
PRIVATE OPEN BUILDING C 2152 SQ. FT.
PRIVATE OPEN BUILDING D 2862 SQ. FT.
TOTAL GROUND PRIVATE OPEN SPACE 10094 SQ. FT.
LANDSCAPE OPEN AREA 29603 SQ. FT.
29603 / 73710 = 40.16%
MAIN PRIVATE OPEN SPACE
PRIVATE OPEN BUILDING A 749 SQ. FT.
PRIVATE OPEN BUILDING B 626 SQ. FT.
PRIVATE OPEN BUILDING C 626 SQ. FT.
PIVATE OPEN BUILDING D 749 SQ. FT.
TOTAL MAIN PRIVATE OPEN SPACE 2749 SQ. FT.
TOTAL PRIVATE OPEN SPACE 12842.722 SQ. FT.
TOTAL OPEN AREA 32352 SQ. FT.
32352 / 73710 = 43.89%
LEGEND
COMMON OPEN SPACE:
GROUND PRIVATE OPEN SPACE: INCLUDES PORCHES
TOTAL GROUND FLOOR PORCH SPACE:
5202 SQ. FT.
MAIN PRIVATE OPEN SPACE: INCLUDES DECKS
SCALE:
OPEN SPACE CALCULATION
GI 8
1/16" = 1'-0"
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\SP\317074_SP OPEN SPACE.dwg, OPEN SPACE CALCULATION, 1/28/2026 9:57:12 AM, 02/16/2024 - PROGRESS SET
1. VIEW FROM SAN LEANDRO AVE
2. VIEW FROM SAN LEANDRO AVE
SCALE:
PHOTOREALISTIC IMAGES
PI1
1/16" = 1'-0"
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\SP\317074_SP_Photorealistic.dwg, PHOTOREALISTIC IMAGE, 1/28/2026 9:57:24 AM, 02/16/2024 - PROGRESS SET
39.60 PLANT'G
STRIP
SIDEWALK
FRONT
YARDPORCHBUILDING C21'-0"
DRIVE AISLE
BUILDING D
2 - EAST WEST SITE SECTION
3'-0"
APRON
3'-0"
APRON
SETBACK LINE FROM BACK OF CURB
20'-0" SETBACK FROM PROP. LINE
PUBLIC
WALK
±41'-6" TO FRONT OF BUILDING FROM BACK OF CURB
VARIES
PORCHBUILDING A21'-0"
DRIVE AISLE
3'-0"
APRON
3'-0"
APRON
PROPERTY LINE
PORCH
SETBACK LINE FROM BACK OF CURB
PROJECT
WALK
PLANT'G
STRIP
±16'-0"PRIVATE YARD
SAN
LEANDRO
STREET
BUILDING BPORCH
21'-0" 21'-0"
SIDEWALK
PRIVATE YARD
FRONT
YARD±49'-0" OPEN LAWN
PUBLIC
PARK
±40.60
15'-0" SETBACK
F F FF F
PROPERTY LINE
PROPERTY LINE
PLANT'G
STRIPNEIGHBORING PARKING
CITY PARK
TRAILADJACENT SINGLE
FAMILY HOUSE
REAR YARD
PARKING
CURB RAMP
PLANTING
STRIP
BEYOND 24'-0" CURB RAMP COMMON PATH OPEN LAWN HERB GARDEN SEATING AREA
BUILDING C ELEVATION
BUILDING
SETBACKLONG WAVE PHOTONICS PARKING
HOME AT
750 SAN
PABLO
ACCESS DRIVE AND CITY PARK TRAIL
1 - NORTH / SOUTH SITE SECTION
PROPERTY
LINE FENCE
SEE
LANDSCAPE
DRAWINGS
PROPERTY LINE
COMMUNITY
OPEN
SPACE
38.60 RETAINING
WALL SEE
CIVIL
DDRAWINGS
SCALE:
CONCEPTUAL SITE SECTIONS
PI2
1/16" = 1'-0"
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\SP\317074_SP Section.dwg, SITE SECTION, 1/28/2026 9:57:40 AM, 02/16/2024 - PROGRESS SET 4 - NEIGHBORHOOD CONTEXT - VIEW FROM SOUTHEAST
SCALE:
CONCEPTUAL MASSING MODEL IN SITE
PI3.1
NTS
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\SP\317074_SP PERSPECTIVES.dwg, CONCEPTUAL MASSING IN SITE, 1/28/2026 9:57:55 AM, 02/16/2024 - PROGRESS SET 5 - SAN LEANDRO AVENUE FROM NORTHEAST
1 - VIEW AT DRIVE AISLE ACCESS
FROM SAN LEANDRO AVE
2 - SOUTHWEST VIEW AT PARK
3 - SOUTHEAST SITE BIRDSEYE VIEW
FROM SAN LEANDRO AVE
4 - SITE VIEW FROM NORTHWEST
BD.3
CARPET/9'-1"
ENT
TILE/9'-1"
2040 FX
3080
9070 SECT ROLL-UP
UP
2868
GAR W/ 9X40 TANDEM
CONC./9'-1"
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
16070 SECT ROLL-UP
*4050 SL
3080
30x24 CLR T.P.
T.R.
2468
5068 BI-PASS
2668
2868
T.H.
FRONT PORCH
TILE/9'-1"
GAR W/ 18'-20' PARKING
CONC./9'-1"
3080
9070 SECT ROLL-UP
UP
2868
ENTTILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
FRONT PORCH
30x24 CLR
T.P.
T.R.
BD.3
CARPET/9'-1"
2468
5068 BI-PASS
2668
16070 SECT ROLL-UP
UP 3080
2868
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
GAR W/ 9X40 TANDEM
CONC./9'-1"
GAR W/ 18'-20' PARKING
CONC./9'-1"
2040 FX
*4050 SL
2040 SH
16070 SECT ROLL-UP
UP
*PR3050 SH
ENT
TILE/9'-1"
BD.3
CARPET/9'-1"
3080
16070 SECT ROLL-UP
T.R.
T.P.
3068
3068
3068
3068
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSEPANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
GAR W/ 18'-20' PARKING
CONC./9'-1"
2040 FX
3080
9070 SECT ROLL-UP
UP
2868
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
GAR W/ 9X40 TANDEM
CONC./9'-1"
3040 SH2040 SH
3080
9070 SECT ROLL-UP
UP
2868
ENT
TILE/9'-1"
2040 SH
3068
GAR W/ 9X40 TANDEM
CONC./9'-1"
PORCH
BD.3
CARPET/9'-1"
ENT
TILE/9'-1"
2040 FX
3080
9070 SECT ROLL-UP
UP
2868
GAR W/ 9X40 TANDEM
CONC./9'-1"
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
16070 SECT ROLL-UP
*4050 SL
3080
30x24 CLRT.P.
T.R.
2468
5068 BI-PASS2668
2868
T.H.
FRONT PORCH
TILE/9'-1"
GAR W/ 18'-20' PARKING
CONC./9'-1"
UP16 RISERS @ 7.75"
15 TREADS @ 10.5"
30x24 CLR
LC
CPT. TILE
SCD.
SCD.
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
UP16 RISERS @ 7.75"
15 TREADS @ 10.5"
30x24 CLR
LC
CPT.TILE
SCD.
SCD.
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METERSTACK
10 UNIT
PHONE
CATV
SPACER
BD.3
CARPET/9'-1"
ENT
TILE/9'-1"
2040 FX
3080
9070 SECT ROLL-UP
UP
2868
GAR W/ 9X40 TANDEM
CONC./9'-1"
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
16070 SECT ROLL-UP
*4050 SL
3080
30x24 CLR T.P.
T.R.
2468
5068 BI-PASS
2668
2868
T.H.
FRONT PORCH
TILE/9'-1"
GAR W/ 18'-20' PARKING
CONC./9'-1"
3080
9070 SECT ROLL-UP
UP
2868
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
FRONT PORCH
30x24 CLR
T.P.
T.R.
BD.3
CARPET/9'-1"
2468
5068 BI-PASS 2668
16070 SECT ROLL-UP
UP3080
2868
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
GAR W/ 9X40 TANDEM
CONC./9'-1"
GAR W/ 18'-20' PARKING
CONC./9'-1"
2040 FX
*4050 SL
2040 SH
16070 SECT ROLL-UP
UP
*PR3050 SH
ENT
TILE/9'-1"
BD.3
CARPET/9'-1"
3080
16070 SECT ROLL-UP
T.R.
T.P.
3068
3068
3068
3068
FIRE
RISER
PGE
PULL
UGPSMAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
GAR W/ 18'-20' PARKING
CONC./9'-1"
2040 FX
3080
9070 SECT ROLL-UP
UP
2868
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
GAR W/ 9X40 TANDEM
CONC./9'-1"
3040 SH 2040 SH
3080
9070 SECT ROLL-UP
UP
2868
ENT
TILE/9'-1"
2040 SH
3068
GAR W/ 9X40 TANDEM
CONC./9'-1"
PORCH
BD.3
CARPET/9'-1"
ENTTILE/9'-1"
2040 FX
3080
9070 SECT ROLL-UP
UP
2868
GAR W/ 9X40 TANDEM
CONC./9'-1"
ENTTILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
16070 SECT ROLL-UP
*4050 SL
3080
30x24 CLRT.P.
T.R.
2468
5068 BI-PASS 2668
2868
T.H.
FRONT PORCH
TILE/9'-1"
GAR W/ 18'-20' PARKING
CONC./9'-1"
SCALE:
CONCEPTUAL MASSING MODEL
PI3.2
NTS
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
1 5
2 4
3 Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\SP\317074_SP PERSPECTIVES.dwg, CONCEPTUAL MASSING MODEL, 1/28/2026 9:57:57 AM, 02/16/2024 - PROGRESS SET
FRONT ELEVATION
BLDG.A EAST ELEVATION
LEFT ELEVATION
BLDG.A SOUTH ELEVATION
REAR ELEVATION
BLDG.A WEST ELEVATION
RIGHT ELEVATION
BLDG.A NORTH ELEVATION
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE: 1/8" = 1'-0"SCALE:
BLDG. A_CONCEPTUAL ELEVATIONS
PI4
1/8" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\BLDG_2\EE\317074_BLDG.2 EE.dwg, BLDG.A, 1/28/2026 9:58:22 AM, 02/16/2024 - PROGRESS SET
FRONT ELEVATION
BLDG.D WEST ELEVATION
LEFT ELEVATION
BLDG.D SOUTH ELEVATION
REAR ELEVATION
BLDG.D EAST ELEVATION
RIGHT ELEVATION
BLDG.D NORTH ELEVATION
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE: 1/8" = 1'-0"SCALE:
BLDGS. D_CONCEPTUAL ELEVATIONS
PI5
1/8" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\BLDG_2\EE\317074_BLDG.2 EE.dwg, BLDG.D, 1/28/2026 9:58:25 AM, 02/16/2024 - PROGRESS SET
FRONT ELEVATION
BLDG.C EAST ELAVATION (BLDG. B SIMILAR)
SIDE ELEVATION
BLDG.C SOUTH ELEVATION (BLDG. B SIMILAR)
REAR ELEVATION
BLDG.C WEST ELEVATION (BLDG. B SIMILAR )
SIDE ELEVATION
BLDG.C NORTH ELEVATION (BLDG. B SIMILAR)
MATERIAL SPECIFICATIONS
· COMPOSITION SHINGLE ROOFING
· 5" OGEE GSM GUTTER
· PARAPET WALL w/ GSM COPING CAP
· SECTIONAL ROLL-UP GARAGE DOOR
· FIBERGLASS FRONT DOOR
· DUAL GLAZED VINYL WINDOW
· METAL METER CABINET DOORS
· STUCCO
· LAP SIDING
· BOARD & BATTEN SIDING
· WOOD TRIM, CORBELS & KICKERS
· WOOD RAILING
· WOOD TRELLIS
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE:
BLDGS. B & C_CONCEPTUAL ELEVATIONS
PI6
1/8" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\BLDG_1\EE\317074_BLDG.1 EE.dwg, BLDGS. B & C, 1/28/2026 9:58:46 AM, 02/16/2024 - PROGRESS SET
SAN LEANDRO AVENUE STREETSCAPE
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE:
CONCEPTUAL STREETSCAPE
PI7
1/8" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Streetscape\317074_Streetscape.dwg, CONCEPTUAL STREETSCAPE, 1/28/2026 9:58:52 AM, 02/16/2024 - PROGRESS SET
PARTIAL ELEVATIONS
1 32 45 6 151112 9A
B EF
A
B
C
ROOF - COMPOSITION SHINGLE
MFR.: CERTAINTEED LANDMARK
THUNDERSTORM GREY
D
E
F
BODY - BOARD & BATTEN, LAP SIDING &
GARAGE DOOR COLOR 2
MFR.: SHERWIN WILLIAMS
UNUSUAL GRAY SW 7059
BODY - STUCCO
MFR.: SHERWIN WILLIAMS
CARGO PANTS SW 7738
G FRONT DOOR
MFR.: THERMA-TRU DOOR
SHERWIN WILLIAMS
a. PEWTER GREEN SW 6208
b. RUSTIC RED SW 7593
c. HIGH TEA SW 7159
b.a.
BODY - GABLES & LAP SIDING
MFR.: SHERWIN WILLIAMS
ADAPTIVE SHADE SW 7053
F I
BODY - LAP SIDING & GARAGE DOOR
COLOR 1
MFR.: SHERWIN WILLIAMS
HONED SOAPSTONE SW 9126
DG(b) G(c)
EXTERIOR LIGHT
MFR.: VISUAL COMFORT AND CO. / WILBURN
COLLECTION (8590901-12) a. DIM: W 6" X H
10.25" X 7.35 EXT.
b. BLACK
c. NIGHT SKY / WET RATED
d. T-24 COMPLIANT / LEDCPAPBLE
BODY - TRIM & GABLE INSETS
MFR.: SHERWIN WILLIAMS
GRECIAN IVORY SW 7541
C.
G(a)
I
E
C
D
F
H BODY - BALCONY FENCE
MFR.: SHERWIN WILLIAMS
WARM STONE SW 7032
H
1314
FINISH SCHEDULE
1 COMPOSITION SHINGLE ROOF
2 5" OGEE GSM GUTTER
3 PARAPET WALL w/GSM COPING
CAP
4 SECTIONAL ROLL-UP GARAGE
DOOR
5 FIBERGLASS FRONT DOOR
6 DUAL GLAZED VINYL WINDOW
7 METAL DOORS AT METER
CLOSET
8 SLIDING GLASS DOOR
9 FRENCH DOOR
10 SLIDING GLASS DOOR
11 LAP SIDING
12 BOARD AND BATTEN SIDING
13 WOOD TRIM, CORBELS, AND
KICKERS
14 WOOD TRELLIS
15 WOOD RAILINGS (3 TYPES)
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE:
CONCEPTUAL MATERIAL AND COLOR SHEET_ BLDG. A
PI11
3/16" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\BLDG_2\EE\317074_BLDG.2 EE_Material.dwg, BLDG.A, 1/28/2026 9:59:38 AM, 02/16/2024 - PROGRESS SET
PARTIAL ELEVATIONS
A
B
C
ROOF - COMPOSITION SHINGLE
MFR.: CERTAINTEED LANDMARK
THUNDERSTORM GREY
D
E
F
BODY - STUCCO 2 & GABLE INSETS
MFR.: SHERWIN WILLIAMS
FENLAND GRAY SW 7544
BODY - STUCCO
MFR.: SHERWIN WILLIAMS
ROYCROFT MIST GRAY SW 2844
FRONT DOOR
MFR.: THERMA-TRU DOOR
SHERWIN WILLIAMS
a. GRIZZLE GRAY SW 7068
b. BLUSTERY SKY SW 9140
c. REMBRANDT RUBY DW 0033
b.a.
BODY - BOARD & BATT &
LAP SIDING
MFR.: SHERWIN WILLIAMS
RUSHING RIVER SW 7746
BODY - LAP SIDING & GABLE INSETS
MFR.: SHERWIN WILLIAMS
TIN LIZZIE SW 9163
EXTERIOR LIGHT
MFR.: VISUAL COMFORT AND CO. / WILBURN
COLLECTION (8590901-12) a. DIM: W 6" X H
10.25" X 7.35 EXT.
b. BLACK
c. NIGHT SKY / WET RATED
d. T-24 COMPLIANT / LEDCPAPBLE
BODY - TRIM: POSTS, BRACKETS &
GABLE INSETS
MFR.: SHERWIN WILLIAMS
NEUTRAL GROUND SW 7568
C.
G
I
H BODY - BALCONY FENCE
MFR.: SHERWIN WILLIAMS
WARM STONE SW 7032
1 32 45 6 151112 9A
B CF
F IG(a)G(c) G(a)G(b) D
G(a)
D
F H
1314
FINISH SCHEDULE
1 COMPOSITION SHINGLE ROOF
2 5" OGEE GSM GUTTER
3 PARAPET WALL w/GSM COPING
CAP
4 SECTIONAL ROLL-UP GARAGE
DOOR
5 FIBERGLASS FRONT DOOR
6 DUAL GLAZED VINYL WINDOW
7 METAL DOORS AT METER
CLOSET
8 SLIDING GLASS DOOR
9 FRENCH DOOR
10 SLIDING GLASS DOOR
11 LAP SIDING
12 BOARD AND BATTEN SIDING
13 WOOD TRIM, CORBELS, AND
KICKERS
14 WOOD TRELLIS
15 WOOD RAILINGS (3 TYPES)
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE:
CONCEPTUAL MATERIAL AND COLOR SHEET_ BLDG. D
PI12
3/16" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\BLDG_2\EE\317074_BLDG.2 EE_Material.dwg, BLDG.D, 1/28/2026 9:59:39 AM, 02/16/2024 - PROGRESS SET
PARTIAL ELEVATIONS
A
B
C
ROOF - COMPOSITION SHINGLE
MFR.: CERTAINTEED LANDMARK
THUNDERSTORM GREY
D
E
F
BODY - BOARD & BATTEN, LAP SIDING 2 &
STUCCO 2
MFR.: SHERWIN WILLIAMS
PEWTER TANKARD SW 0023
BODY - STUCCO, GABLE INSETS
MFR.: SHERWIN WILLIAMS
SHIITAKE SW 9173
FRONT DOOR
MFR.: THERMA-TRU DOOR
SHERWIN WILLIAMS
a. RIPE OLIVE SW 6209
b. STILL WATER SW 6223
c. ROYCROFT SUEDE SW 2842
b.a.
BODY - LAP SIDING 1, BOARD &
BATT, GARAGE DOOR
MFR.: SHERWIN WILLIAMS
LIBRARY PEWTER SW 0038
BODY - LAP SIDING 2, FRONT GABLES
MFR.: SHERWIN WILLIAMS
MOUNTAIN ROAD SW 7433
EXTERIOR LIGHT
MFR.: VISUAL COMFORT AND CO. / WILBURN
COLLECTION (8590901-12) a. DIM: W 6" X H
10.25" X 7.35 EXT.
b. BLACK
c. NIGHT SKY / WET RATED
d. T-24 COMPLIANT / LEDCPAPBLE
BODY - TRIM: POSTS & BRACKETS
MFR.: SHERWIN WILLIAMS
SHOJI WHITE SW 7042
C.
G
I
H BODY - BALCONY FENCE
MFR.: SHERWIN WILLIAMS
WARM STONE SW 7032
G(a) G(b) G(c)
A
B
C
D
E
F H
G(a) C I
46 1591314
11 11
1 12 325
FINISH SCHEDULE
1 COMPOSITION SHINGLE ROOF
2 5" OGEE GSM GUTTER
3 PARAPET WALL w/GSM COPING
CAP
4 SECTIONAL ROLL-UP GARAGE
DOOR
5 FIBERGLASS FRONT DOOR
6 DUAL GLAZED VINYL WINDOW
7 METAL DOORS AT METER
CLOSET
8 SLIDING GLASS DOOR
9 FRENCH DOOR
10 SLIDING GLASS DOOR
11 LAP SIDING
12 BOARD AND BATTEN SIDING
13 WOOD TRIM, CORBELS, AND
KICKERS
14 WOOD TRELLIS
15 WOOD RAILINGS (3 TYPES)
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE:
CONCEPTUAL MATERIAL AND COLOR SHEET_ BLDGS B & C
PI13
1/8" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\BLDG_2\EE\317074_BLDG.2 EE_Material.dwg, BLDG.B&C, 1/28/2026 9:59:40 AM, 02/16/2024 - PROGRESS SET
UPPER FLOOR
PLAN 1-3 INT
MAIN FLOOR
PLAN 1-3 INT
30x24 CLR
T.P.
30x24 CLR
*PR 3050 SH
FX4DNF049
DN
2040 SH
*4050 SL
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
2468
26682668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
DN
*5050 SL
*4050 SL
2040 SH
FX4DNF049
T.R.
T.R.
T.R.
T.P.
30x24 CLR
T.H.
2680 OPEN
2468
2668 OPT
2668
2880
2468
2668
5068 BI-PASS
2680
21080
TILECPT.
TILECPT.
CPT.TILE
BD.2
CPT./9'-1"
BTH.1
TILE/9'-1"
BTH.2
TILE/9'-1"
M.BD.
CPT./9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
LC
2468
T.P.T.H.
30x24 CLR
2468
LC LC
BD.3
CARPET/9'-1"
ENT
TILE/9'-1"
2040 FX
3080
9070 SECT ROLL-UP
UP
2868
GAR W/ 9X40 TANDEM
CONC./9'-1"
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
16070 SECT ROLL-UP
*5050 SL
3080
30x24 CLRT.P.
T.R.
2468
5068 BI-PASS
2668
2868
T.H.
FRONT PORCH
GAR W/ 18'-20' PARKING
CONC./9'-1"
FRONT PORCH
LC
UP
DN
*3050 SH
30x24 CLR
T.P.
T.R.
T.H.
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
2468
2680
5068 BI-PASS
2468
2668
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
DECK
UP
DN
2040 SH
T.P.
30x24 CLR
T.H.
T.R.
5050 SL
K-2268-8MEMOIRSLAVATORYFIRECLAY
2468
2468
DIN.
CPT./9'-1"
PDR.
TILE/
CPTTILE
DECK
LIV.
CPT./9'-1"
KIT.
TILE/9'-1"
3080 FR DR
3050 SH 3050 SHLC
LOWER FLOOR
PLAN 1-3 INT
PLAN 3 INT
GROUND LIVING: 236 SQ. FT.
GARAGE: 236 SQ. FT.
PORCH: 89 SQ. FT.
STORAGE: 164 CUBIC FT.
PLAN 1 INT
GROUND LIVING: 47 SQ. FT.
GARAGE: 463 SQ. FT.
PORCH: 106 SQ. FT.
STORAGE: 164 CUBIC FT.
PLAN 3 INT
UPPER LIVING: 623 SQ. FT.
PLAN 1 INT
UPPER LIVING: 625 SQ. FT.
PLAN 3 INT
MAIN LIVING: 594 SQ. FT.
TOTAL LIVING: 1,453 SQ. FT.
DECK: 55 SQ. FT.
PLAN 1 INT
MAIN LIVING: 680 SQ. FT.
TOTAL LIVING: 1,351 SQ. FT.
DECK: 90 SQ. FT.
31'-8" 31'-8"
1"15'-8"
PLAN 1
2"15'-8"
PLAN 2
36'-0"
20'-8"
31'-8"
1"10'-8"2"
46'-0"
49'-0"
42'-1"
38'-6" 3'-7" 1'-0"
15'-8"2"15'-8"1" 1"
31'-8"
41'-0" 2'-113
4"
31'-8"
1"
31'-8"
1"15'-8"
PLAN 1
2"15'-8"
PLAN 3
1"1"15'-8"
PLAN 1
2"15'-8"
PLAN 3
1"
41'-0" 1'-0"
9'-7"6'-1"2"9'-7"6'-1"1"
164 CUBIC FT.
OF STORAGE
164 CUBIC FT.
OF STORAGE
5'-0" 41'-0"
1 2.4.1
1 2.4.1
1 2.4.1
1 2.4.1
1 2.4.1
1 2.4.1
2 2.4.1
2 2.4.1
2 2.4.1
2 2.4.1
2 2.4.1
2 2.4.1
1"
1"
7'-0"
44'-0"5'-0"
2'-0"
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE:
CONCEPTUAL PLAN 1-3 FP INT
A2.1.1
1/4" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Unit Plans\Plan 1-3\FP\317074_PLAN 1-3 FP.dwg, PLAN 1-3 INT FLOOR PLANS, 1/28/2026 9:59:48 AM, 02/16/2024 - PROGRESS SET 3080
9070 SECT ROLL-UP
UP
2868
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
FRONT PORCH
30x24 CLR
T.P.
T.R.
BD.3
CARPET/9'-1"
2468
5068 BI-PASS
2668
16070 SECT ROLL-UP
UP3080
2868
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
GAR W/ 9X40 TANDEM
CONC./9'-1"
GAR W/ 18'-20' PARKING
CONC./9'-1"
2040 FX
*4050 SL
2040 SH
FRONT PORCH
UP
DN
*4050 SL
30x24 CLR
T.P.
T.R.
T.H.
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
2468
2680
5068 BI-PASS
2468
2668
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
DECK
UP
DN
2040 SH
T.P.
30x24 CLR
T.H.
T.R.
5050 SL
K-2268-8MEMOIRSLAVATORYFIRECLAY
LC
2468
2468
LIV.
CPT./9'-1"
KIT.
TILE/9'-1"
DIN.
CPT./9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
PDR.
TILE/
16 RISERS @ 7.75"
15 TREADS @ 10.5"
4050 SL
LC
3080 FR DR
3050 SH
LC
3030 SH3030 SH
3080 FR. DR.
4050 SL
3050 SH
LC
LC
DECK
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
2040 SH
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
246826682668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
T.P.
DN
*4050 SL
2040 SH
FX4DNF049
T.R.
T.R.
T.H.
T.R.
2050 SH
T.P.
30x24 CLR
T.H.
2040 SH
2680 OPEN
2468
2668 OPT
2668
2468
2880
2468
2668
5068 BI-PASS
2680
21080
BD.2
CPT./9'-1"
BTH.1
TILE/9'-1"
BTH.2
TILE/9'-1"
M.BD.
CPT./9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
30x24 CLR
2468
*4050 SL
*4050 SL
*3050 SH *3050 SH
2040 SH2040 SH 2040 SH
LC
LC LC
UPPER FLOOR
PLAN 1-3 END
MAIN FLOOR
PLAN 1-3 END
LOWER FLOOR
PLAN 1-3 END
PLAN 1B INT
GROUND LIVING: 47 SQ. FT.
GARAGE: 463 SQ. FT.
PORCH: 100 SQ. FT.
STORAGE: 164 CUBIC FT.
PLAN 3 END
GROUND LIVING: 232 SQ. FT.
GARAGE: 455 SQ. FT.
PORCH: 121 SQ. FT.
STORAGE: 164 CUBIC FT.
PLAN 1B INT
UPPER LIVING: 659 SQ. FT.
PLAN 3 END
UPPER LIVING: 643 SQ. FT.
PLAN 1B INT
MAIN LIVING: 679 SQ. FT.
TOTAL LIVING: 1,385 SQ. FT.
DECK: 91 SQ. FT.
PLAN 3 END
MAIN LIVING: 650 SQ. FT.
TOTAL LIVING: 1,525 SQ. FT.
DECK: 58 SQ. FT.
31'-9"
15'-10"
PLAN 3
2"15'-8"
PLAN 1
1"
41'-0"
10'-8"
31'-9"
44'-0"
2"
44'-0"
41'-1"
37'-6" 3'-7" 1'-0"
15'-8" 2" 16'-2"1"
32'-1"
33'-7"
15'-8"
PLAN 1
2" 17'-8"
PLAN 3
5'-11
2"
32'-1"
39'-0" 2'-01
4"
32'-1"
16'-2"
PLAN 1
2"15'-8"
PLAN 3
41'-0" 3'-0"
15'-9" 2" 16'-1"1"
164 CUBIC FT.
OF STORAGE
164 CUBIC FT.
OF STORAGE
5'-0"
41'-0"
2'-0"
1"
1'-0"
1" 20'-10"
15'-8"1"
37'-0"7'-0"
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE:
CONCEPTUAL PLAN 1-3 END
A2.1.2
1/4" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Unit Plans\Plan 1-3\FP\317074_PLAN 1-3 FP.dwg, PLAN 1-3 END, 1/28/2026 9:59:50 AM, 02/16/2024 - PROGRESS SET 30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
2040 SH
*4050 SL
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
2468
26682668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
*4050 SL
3080
9070 SECT ROLL-UP
UP
2868ENT
TILE/9'-1"
2040 SH
3068
GAR W/ 9X40 TANDEM
CONC./9'-1"
PORCH
T.B.
T.B.
UP
DN
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
3050 SH
2468
2468
2668
3080 FR DR
3050 SH
DECK
2668
*5050 SL
MAIN FLOOR PLAN
PLAN 2
GROUND FLOOR PLAN
PLAN 2
MAIN LIVING: 670 SQ. FT.
TOTAL LIVING:1,498 SQ. FT.
DECK: 70 SQ. FT.
GROUND LIVING: 175 SQ. FT.
GARAGE: 564 SQ. FT.
FRONT PORCH: 15 SQ. FT.
STORAGE: 164 CUBIC FT.
UPPER FLOOR PLAN
PLAN 2
15'-8"
1"15'-8"1"
45'-0"3'-0"
15'-8"
1" 0"
15'-8" 1"1"
15'-10"
15'-10"
15'-8"
6'-1" 9'-7" 1"
1"
15'-10"
1"
15'-10"
43'-6"
40'-6"
42'-0"
164 CUBIC FT.
OF STORAGE
3'-0"40'-6"
UPPER LIVING: 653 SQ. FT.
5'-0"
47'-0"
10'-91
2"4'-101
2"
48'-0"
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE:
CONCEPTUAL PLAN 2 ADA FLOOR PLANS
A2.1.3
1/4" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Unit Plans\Plan 2\FP\317074_PLAN 2 FP.dwg, PLAN 2 FLOOR PLANS, 1/28/2026 9:59:56 AM, 02/16/2024 - PROGRESS SET
UPPER FLOOR
PLAN 1-4
PLAN 4
UPPER LIVING: 732 SQ. FT.
MAIN FLOOR
PLAN 1-4
PLAN 4
MAIN LIVING: 697 SQ. FT.
DECK: 56 SQ. FT.
TOTAL LIVING: 1,727 SQ. FT.
30x24 CLR
DN
2680 OPEN
2468
2468
2668
2880
2468
2668
5068 BI-PASS
*4050 SL
2040 SH
2680
FX4DNF049
2040 SH 2040 SH
30x24 CLR
2050 FX
M.BD.
BD.2
BTH.2
2668 OPT
21080
BTH.1
2468
LC
30x24 CLR
30x24 CLR
FX4DNF049
DN
2040 SH
*4050 SL
+36"
4068 BI-PASS
2468
26682668
2668 OPT
2468
2880
2468
21080
M.BD.
BD.2
BTH.2
BTH.1
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
5050 SL
*3050 SH *3050 SH
*3050 SH
*3050 SH
16070 SECT ROLL-UP
UP
2868
*3050 SH
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
30x24 CLR
T.P.
T.R.
BD.3
CARPET/9'-1"
2468
5068 BI-PASS
2668
3080
2680
GAR
CONC./9'-1"
SCD
2040 FX
3080
9070 SECT ROLL-UP
UP
2868
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
GAR W/ 9X40 TANDEM
CONC./9'-1"
*3050 SH
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
FRONT PORCH
BASE
UP
DNT.P.
2040 SH
2468
2468
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
3050 SH
30x24 CLR
T.R.
K-2268-8MEMOIRSLAVATORYFIRECLAY
UP
DN
3050 SH
*4050 SL
30x24 CLR
T.P.
T.R.
T.H.
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
2468
2680
5068 BI-PASS
2468
2668
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
DECK 3080 FR DR
3050 SH
3050 SH 3050 SH
3050 SH
DECK
2040 SH2040 SH
3050 SH
3050 SH3050 SH
LOWER FLOOR
PLAN 1-4
PLAN 4
LOWER LIVING: 298 SQ. FT.
PORCH: 129 SQ. FT.
GARAGE: 454 SQ. FT.
STORAGE: 164 CUBIC FT.
NOTE:
PLEASE SEE SHEETS A2.1 AND
A2.2 FOR PLAN 1 INFORMATION
NOTE:
PLEASE SEE SHEETS A2.1 AND
A2.2 FOR PLAN 1 INFORMATION
NOTE:
PLEASE SEE SHEETS A2.1 AND
A2.2 FOR PLAN 1 INFORMATION
3'-6" 6'-1" 1"
19'-3"
1'-6" 3'-8" 1"
19'-3"
3'-6" 1"
19'-3"
11'-81
2" 5'-111
2"
19'-2"
1"
17'-8"
17'-9"
9'-7"
14'-0"
15'-8"
43'-1"
12'-71
2" 15'-0" 15'-51
2"
44'-0"
7'-0" 37'-0"
1"17'-8"
164 CUBIC FT.
OF STORAGE
164 CUBIC FT.
OF STORAGE
22'-8"
22'-9"
4'-11"17'-9"
1'-6"
1"
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE:
CONCEPTUAL PLAN 1- 4 FP
A2.3.1
1/4" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Unit Plans\Plan 1-4\317074_PLAN 1-4 FP.dwg, PLAN 1-4 FLOOR PLANS, 1/28/2026 10:00:02 AM, 02/16/2024 - PROGRESS SET
LOWER FLOOR
PLAN 1-4_ADA LOWER LIVING: 298 SQ. FT.
GARAGE: 454 SQ. FT.
STORAGE: 164 CUBIC FT.
16070 SECT ROLL-UP
UP
*PR3050 SH
ENT
TILE/9'-1"
BD.3
CARPET/9'-1"
3080
16070 SECT ROLL-UP
T.R.
T.P.
3068
3068
3068
3068
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
GAR W/ 18'-20' PARKING
CONC./9'-1"
2040 FX
3080
9070 SECT ROLL-UP
UP
2868
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
GAR W/ 9X40 TANDEM
CONC./9'-1"
22'-10" 1"
22'-11"
12'-111
2" 4'-101
2" 1"
17'-11"
42'-0"
164 CUBIC FT.
OF STORAGE
164 CUBIC FT.
OF STORAGE
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE:
CONCEPTUAL PLAN 4 FP_ADA
A2.3.2
1/4" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Unit Plans\Plan 1-4\317074_PLAN 1-4 FP.dwg, PLAN 1-4 - ADA, 1/28/2026 10:00:03 AM, 02/16/2024 - PROGRESS SET
UPPER PLATE
UPPER SUBFLR
MAIN PLATE
SOG
MAIN SUBFLR
GROUND PLATE
ATTIC
BD. 2 M. BD.
LIV.
GAR.
PORCH
9'-1" 9'-1" 9'-1"HALL
A B
KIT DIN.
PRIVATE
DRIVE
2 A2.1.1
PLAN 3 BUILDING SECTION - TYP. FOR BLDGS. A,B,C.& D
PLAN 3
±39'-0"
BD. 3BA. 3
9"
3'-31
2" 3'-6"
UPPER PLATE
UPPER SUBFLR
MAIN PLATE
SOG
MAIN SUBFLR
GROUND PLATE
ATTIC
BA.2 CLO.
LIV.
GAR.
AT PLAN 1 PORCH
9'-1" 9'-1" 9'-1"
BATH 3
LDY
A B
HALL DIN.
PRIVATE
DRIVE
3 8:12
PV UNITS
1 A2.1.1
PLAN 1 BUILDING SECTION - TYP. FOR BLDGS. A,B,C.& D
PLAN 1
AC UNIT
±39'-0"
1'-10"
6:12
9" 3'-9"
10'-6"18'-0"10'-6"3'-0"
RAISED HEEL
2'-5"
3 8:12
PV UNITS
AC UNIT6:12
1'-10"
10'-6"18'-0"10'-6"
2'-1115
16"
8"
MIN.
5"
2'-75
8"
3'-10"
RHEEM SELECT WA13 SERIES 48 OR 60
CONDENSOR OR EQUAL
STORAGE TYP. STORAGE TYP.
7'-3"
7'-3"
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE:
CONCEPTUAL UNIT SECTIONS
A2.4.1
1/8" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Wall Sections\317074_WS_Det.dwg, BLDG SEC, 1/28/2026 10:00:08 AM, 02/16/2024 - PROGRESS SET UP16 RISERS @ 7.75"
15 TREADS @ 10.5"
30x24 CLR
LC
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
UP16 RISERS @ 7.75"
15 TREADS @ 10.5"
30x24 CLR
UP16 RISERS @ 7.75"
15 TREADS @ 10.5"
30x24 CLR
160'-4"
17'-10"
PLAN 4 ADA
2" 15'-8"
PLAN 1B
2" 15'-8"
PLAN 3A
2" 15'-8"
PLAN 1A
2" 15'-8"
PLAN 1B
2" 15'-8"
PLAN 1B
2" 15'-10"
PLAN 3B
2" 15'-10"
PLAN 1
2" 15'-10"
PLAN 3 END
44'-01
4" 3'-0"
7'-0"
49'-0"
5'-0"
1'-01
2"
37'-0"
160'-4"
126'-8"33'-8"
2'-0"
2"15'-8"
17'-9" 5'-6" 10'-8" 5'-101
2" 5'-01
2" 20'-10" 5'-01
2" 10'-3" 10'-7" 4'-8" 1'-7" 4'-0" 1'-0" 9'-11"
1'-111
2"
GROUND FLOOR PLAN
BLDG. A (BLDG. D SIM.) 7,110 SQ. FT. NORTH
BLDG. A0 5 302010
5'-6" 5'-111
2"15'-9" 10'-3"10'-2"
7'-0"
52'-61
2"
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE: 1/8" = 1'-0"SCALE:
BLDGS. A & D _CONCEPTUAL GROUND FLOOR PLAN
A3.1.1
1/8" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\BLDG_2\FP\317074_BLDG.2 FP.dwg, TYPE B BLDG. 1-4 _GROUND FLOOR PLAN, 1/28/2026 10:00:17 AM, 02/16/2024 - PROGRESS SET 2'-9" 10'-2"
K-2268-8MEMOIRSLAVATORYFIRECLAYK-2268-8MEMOIRSLAVATORYFIRECLAY BASE
UP
DN30x24 CLR
K-2268-8MEMOIRSLAVATORYFIRECLAY
UP
DN
K-2268-8MEMOIRSLAVATORYFIRECLAY
30x24 CLR
K-2268-8MEMOIRSLAVATORYFIRECLAY
CPTTILE
162'-2"
17'-10"
PLAN 4 ADA
2" 15'-8"
PLAN 1B
2" 15'-8"
PLAN 3A
2" 15'-8"
PLAN 1A
2" 15'-8"
PLAN 1B
2" 15'-8"
PLAN 1B
23 4" 15'-71
4"
PLAN 3B
2" 15'-8"
PLAN 1
2" 17'-8"
PLAN 3 END
37'-6" 1'-0"3'-6"
12'-8"
50'-91
4"
8'-7"
3'-7"
42'-21
4"
162'-2"
127'-0"35'-2"
11" 4'-1"11'-101
2"
2"15'-8"
11'-81
2" 6'-31
2" 6'-21
2" 9'-91
2" 2'-9" 2'-9" 6'-21
2" 9'-91
2" 5'-8" 10'-2" 2'-9" 9'-10" 6'-2" 2'-9" 6'-21
2" 11'-71
2"
15'-10" 15'-10"3'-6" 15'-10" 15'-8" 16'-0" 31'-6" 16'-0" 15'-8" 16'-4" 12'-71
2" 15'-0"
12'-8"
MAIN FLOOR PLAN
BLDG. A (BLDG. D SIM.) 6,825 SQ. FT. NORTH
BLDG. A0 5 302010
1'-0"
10'-2" 10'-2" 2'-9"
1'-0"11'-21
2"
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE:
BLDGS. A & D _CONCEPTUAL MAIN FLOOR PLAN
A3.1.2
1/8" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\BLDG_2\FP\317074_BLDG.2 FP.dwg, TYPE B BLDG. 1-4 _MAIN FLOOR PLAN, 1/28/2026 10:00:18 AM, 02/16/2024 - PROGRESS SET FX4DNF049
FX4DNF049
T.P.
FX4DNF049
T.H.
T.R.
T.H.
T.R.
T.P. T.P.
FX4DNF049
T.R.
T.R.
T.H.
T.R.
T.P.
T.H.
FX4DNF049
FX4DNF049
TILECPT.
TILECPT.
CPT.TILE
FX4DNF049
FX4DNF049
TILECPT.
CPT.TILE
FX4DNF049
FX4DNF049
TILE CPT.
CPT. TILE
160'-8"
17'-10"
PLAN 4 ADA
2" 15'-8"
PLAN 1B
2" 15'-8"
PLAN 3A
2" 15'-8"
PLAN 1A
2" 15'-8"
PLAN 1B
2" 15'-8"
PLAN 1B
23 4" 15'-71
4"
PLAN 3B
2" 15'-8"
PLAN 1
2" 16'-2"
PLAN 3 END
1'-0"12'-81
2"
48'-1"
7'-1"
2'-0"
41'-0"
162'-2"
127'-0"35'-2"
1'-0" 4'-1"13'-41
2"12'-71
2"
2"15'-8"
17'-7" 16'-0" 16'-0" 15'-8" 16'-0" 31'-6" 16'-0"162'-2"1'-6" 15'-0"
3'-6" 9'-7" 6'-3" 6'-1" 9'-9" 6'-1" 9'-9" 6'-0" 9'-10" 6'-1" 6'-1" 19'-4" 6'-1" 9'-9" 6'-1" 9'-9" 6'-1" 6'-3" 10'-1" 2'-0"26'-31
2"
39'-0"
UPPER FLOOR PLAN
BLDG. A (BLDG. D SIM.) 6,559 SQ. FT. NORTH
BLDG. A0 5 302010
15'-91
2"
9'-10"
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE:
BLDGS. A & D _CONCEPTUAL UPPER FLOOR PLAN
A3.1.3
1/8" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\BLDG_2\FP\317074_BLDG.2 FP.dwg, TYPE B BLDG. 1-4 _UPPER FLOOR PLAN, 1/28/2026 10:00:19 AM, 02/16/2024 - PROGRESS SET
CONCEPTUAL
HVAC UNIT
LOCATION
6:12
6:12
6:12
SEE SOLAR PANEL
PLAN FOR EXACT
LOCATION
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
ROOF PLAN
BLDG. A (BLDG. D SIM.) NORTH
BLDG. A0 5 302010
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE: 1/8" = 1'-0"SCALE:
BLDGS. A & D _CONCEPTUAL ROOF PLAN
A3.1.4
1/8" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\BLDG_2\RP\317074_BLDG.2 RP.dwg, BLDG. 4 RP, 1/28/2026 10:00:26 AM, 02/16/2024 - PROGRESS SET
F F F F F
FRONT ELEVATION
BLDG. A EAST ELEVATION ( BLDG D SIMILAR )
LEFT ELEVATION
BLDG. A SOUTH ELEVATION (BUILDING D SIMILAR)
REAR ELEVATION
BLDG. A WEST ELEVATION ( BUILDING D SIMILAR )
RIGHT ELEVATION
BLDG. A NORTH ELEVATION ( BUILDING D SIMILAR )
MATERIAL SPECIFICATIONS
· COMPOSITION SHINGLE ROOFING
· 5" OGEE GSM GUTTER
· PARAPET WALL w/ GSM COPING CAP
· SECTIONAL ROLL-UP GARAGE DOOR
· FIBERGLASS FRONT DOOR
· DUAL GLAZED VINYL WINDOW
· METAL METER CABINET DOORS
· STUCCO
· LAP SIDING
· BOARD & BATTEN SIDING
· WOOD TRIM, CORBELS & KICKERS
· WOOD RAILING
· WOOD TRELLIS
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE: 1/8" = 1'-0"SCALE:
BLDGS. A & D _CONCEPTUAL ELEVATIONS
A3.1.5
1/8" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\BLDG_2\EE\317074_BLDG.2 EE.dwg, A3.1.5 BLDGS. A & D, 1/28/2026 10:00:47 AM, 02/16/2024 - PROGRESS SET
GROUND FLOOR PLAN
BLDG. C (BLDG. B SIM.) 6,438 SQ. FT.
BD.3
CARPET/9'-1"
ENT
TILE/9'-1"
2040 FX
3080
9070 SECT ROLL-UP
UP
2868
GAR W/ 9X40 TANDEM
CONC./9'-1"
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
16070 SECT ROLL-UP
*4050 SL
3080
30x24 CLR T.P.
T.R.
2468
5068 BI-PASS
2668
2868
T.H.
FRONT PORCH
TILE/9'-1"
GAR W/ 18'-20' PARKING
CONC./9'-1"
3080
9070 SECT ROLL-UP
UP
2868
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
FRONT PORCH
30x24 CLR
T.P.
T.R.
BD.3
CARPET/9'-1"
2468
5068 BI-PASS
2668
16070 SECT ROLL-UP
UP3080
2868
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
GAR W/ 9X40 TANDEM
CONC./9'-1"
GAR W/ 18'-20' PARKING
CONC./9'-1"
2040 FX
*4050 SL
2040 SH
16070 SECT ROLL-UP
UP
*PR3050 SH
ENT
TILE/9'-1"
BD.3
CARPET/9'-1"
3080
16070 SECT ROLL-UP
T.R.
T.P.
3068
3068
3068
3068
FIRE
RISER
PGE
PULL
UGPS
MAIN
HOUSE
PANEL
METER
STACK
10 UNIT
PHONE
CATV
SPACER
GAR W/ 18'-20' PARKING
CONC./9'-1"
2040 FX
3080
9070 SECT ROLL-UP
UP
2868
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
GAR W/ 9X40 TANDEM
CONC./9'-1"
3040 SH 2040 SH
3080
9070 SECT ROLL-UP
UP
2868ENT
TILE/9'-1"
2040 SH
3068
GAR W/ 9X40 TANDEM
CONC./9'-1"
PORCH
BD.3
CARPET/9'-1"
ENT
TILE/9'-1"
2040 FX
3080
9070 SECT ROLL-UP
UP
2868
GAR W/ 9X40 TANDEM
CONC./9'-1"
ENT
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
16070 SECT ROLL-UP
*4050 SL
3080
30x24 CLRT.P.
T.R.
2468
5068 BI-PASS
2668
2868
T.H.
FRONT PORCH
TILE/9'-1"
GAR W/ 18'-20' PARKING
CONC./9'-1"
131'-10"
17'-8"
PLAN 4 ADA
2" 15'-8"
PLAN 1B
2" 15'-8"
PLAN 3A
2" 15'-8"
PLAN 1A
2" 15'-8"
PLAN 1B
2" 15'-8"
PLAN 1B
23 4" 15'-71
4"
PLAN 3B
2" 15'-8"
PLAN 1
16'-0"15'-8"10'-6"
42'-0" 1'-0"
52'-6" 3'-0"
8'-6"
2'-0"44'-0"
144'-8"
110'-10"33'-10"
10'-6"5'-4"15'-81
4"5'-2"5'-0"12'-8"
15'-10"
5'-2" 16'-0"
NORTH
BLDG. C0 5 302010
10'-6"
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE: 1/8" = 1'-0"SCALE:
BLDGS. B & C CONCEPTUAL GROUND FLOOR PLAN
A3.2.1
1/8" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\BLDG_1\FP\317074_BLDG.1 FP.dwg, BLDG. 1 FP_GROUND, 1/28/2026 10:00:58 AM, 02/16/2024 - PROGRESS SET UP
DN
*3050 SH
30x24 CLR
T.P.
T.R.
T.H.
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
2468
2680
5068 BI-PASS
2468
2668
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
DECK
UP
DN
2040 SH
T.P.
30x24 CLR
T.H.
T.R.
5050 SL
K-2268-8MEMOIRSLAVATORYFIRECLAY
2468
2468
DIN.
CPT./9'-1" PDR.
TILE/
CPTTILE
DECK
LIV.
CPT./9'-1"
KIT.
TILE/9'-1"
*3050 SH
3080 FR DR
3050 SH3050 SH
2020 AW
UP
DN
*4050 SL
30x24 CLR
T.P.
T.R.
T.H.
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
2468
2680
5068 BI-PASS
2468
2668
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
DECK
UP
DN
2040 SH
T.P.
30x24 CLR
T.H.
T.R.
5050 SL
K-2268-8MEMOIRSLAVATORYFIRECLAY
LC
2468
2468
LIV.
CPT./9'-1"
KIT.
TILE/9'-1"
DIN.
CPT./9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
PDR.
TILE/
16 RISERS @ 7.75"
15 TREADS @ 10.5"
4050 SL
LC
3080 FR DR
3050 SH
LC
3030 SH3030 SH
3080 FR. DR.
4050 SL
3050 SH
BASE
UP
DN
T.P.
2040 SH
2468
2468
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
3050 SH
30x24 CLR
T.R.
K-2268-8MEMOIRSLAVATORYFIRECLAY
UP
DN
3050 SH
*4050 SL
30x24 CLR
T.P.
T.R.
T.H.
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
2468
2680
5068 BI-PASS
2468
2668
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
DECK 3080 FR DR
3050 SH
3050 SH 3050 SH
3050 SH
DECK
2040 SH2040 SH
3050 SH
3050 SH3050 SH
T.B.
T.B.
UP
DN
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
3050 SH
2468
2468
2668
3080 FR DR
3050 SH
DECK
2668
*5050 SL
UP
DN
*3050 SH
30x24 CLR
T.P.
T.R.
T.H.
DIN.
CPT./9'-1"
KIT.
TILE/9'-1"
LIV.
CPT./9'-1"
2468
2680
5068 BI-PASS
2468
2668
BD.3
CPT./9'-1"
BTH.3
TILE/9'-1"
DECK
UP
DN
2040 SH
T.P.
30x24 CLR
T.H.
T.R.
5050 SL
K-2268-8MEMOIRSLAVATORYFIRECLAY
2468
2468
DIN.
CPT./9'-1"
PDR.
TILE/
CPTTILE
DECK
LIV.
CPT./9'-1"
KIT.
TILE/9'-1"
*3050 SH
3080 FR DR
3050 SH 3050 SH
146'-41
4"
17'-10"
PLAN 4 ADA
2" 15'-8"
PLAN 1B
2" 15'-8"
PLAN 3A
2" 15'-8"
PLAN 1A
2" 15'-8"
PLAN 1B
2" 15'-8"
PLAN 1B
23 4" 15'-71
4"
PLAN 3B
2" 15'-8"
PLAN 1
2" 17'-61
4"
PLAN 3 END
11'-8"15'-8"6'-2"
40'-6" 1'-0"3'-6"
12'-8"12'-8"
52'-6"
13'-0"
3'-6"
39'-6"
144'-8"
110'-10"33'-10"
6'-2"9'-10"6'-2"10'-3"6'-1"11'-9"
9" 1'-0" 8'-6"11'-11"15'-0"
9'-10"
11'-2"
MAIN FLOOR PLAN
BLDG. C (BLDG. B SIM.) 5977 SQ. FT. NORTH
BLDG. C0 5 302010
2'-8"
12'-7"
1'-0"3'-0"
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE: 1/8" = 1'-0"SCALE:
BLDGS. B & C CONCEPTUAL MAIN FLOOR PLAN
A3.2.2
1/8" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\BLDG_1\FP\317074_BLDG.1 FP.dwg, BLDG. 1 FP_MAIN, 1/28/2026 10:00:59 AM, 02/16/2024 - PROGRESS SET 30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
2040 SH
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
246826682668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
T.P.
DN
*4050 SL
2040 SH
FX4DNF049
T.R.
T.R.
T.H.
T.R.
2050 SH
T.P.
30x24 CLR
T.H.
2040 SH
2680 OPEN
2468
2668 OPT
2668
2468
2880
2468
2668
5068 BI-PASS
2680
21080
BD.2
CPT./9'-1"
BTH.1
TILE/9'-1"
BTH.2
TILE/9'-1"
M.BD.
CPT./9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
30x24 CLR
2468
*4050 SL
*4050 SL
*3050 SH *3050 SH
2040 SH2040 SH 2040 SH
T.P.
30x24 CLR
DN
2680 OPEN
2468
2468
2668
2880
2468
2668
5068 BI-PASS
*4050 SL
2040 SH
2680
FX4DNF049
T.R.
T.H.
2040 SH 2040 SH
30x24 CLR
2050 FX
T.R. T.H.
T.R.
T.P.
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
2668 OPT
21080
BTH.1
TILE/9'-1"
2468
LC
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
2040 SH
*4050 SL
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
2468
26682668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
5050 SL
*3050 SH *3050 SH
*3050 SH
*3050 SH
30x24 CLR
T.P.
30x24 CLR
FX4DNF049
DN
2040 SH
*4050 SL
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
2468
26682668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
*4050 SL
30x24 CLR
T.P.
30x24 CLR
*PR 3050 SH
FX4DNF049
DN
2040 SH
*4050 SL
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
2468
26682668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
DN
*5050 SL
*4050 SL
2040 SH
FX4DNF049
T.R.
T.R.
T.R.
T.P.
30x24 CLR
T.H.
2680 OPEN
2468
2668 OPT
2668
2880
2468
2668
5068 BI-PASS
2680
21080
TILE CPT.
TILE CPT.
CPT. TILE
BD.2
CPT./9'-1"
BTH.1
TILE/9'-1"
BTH.2
TILE/9'-1"
M.BD.
CPT./9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
LC
2468
T.P.T.H.
30x24 CLR
2468
30x24 CLR
T.P.
30x24 CLR
*PR 3050 SH
FX4DNF049
DN
2040 SH
*4050 SL
T.H.
T.R.
T.H.
T.R.
T.P.
+36"
4068 BI-PASS
2468
26682668
2668 OPT
2468
2880
2468
21080
M.BD.
CPT./9'-1"
BD.2
CPT./9'-1"
BTH.2
TILE/9'-1"
BTH.1
TILE/9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
2468
DN
*5050 SL
*4050 SL
2040 SH
FX4DNF049
T.R.
T.R.
T.R.
T.P.
30x24 CLR
T.H.
2680 OPEN
2468
2668 OPT
2668
2880
2468
2668
5068 BI-PASS
2680
21080
TILECPT.
TILECPT.
CPT.TILE
BD.2
CPT./9'-1"
BTH.1
TILE/9'-1"
BTH.2
TILE/9'-1"
M.BD.
CPT./9'-1"
16 RISERS @ 7.75"
15 TREADS @ 10.5"
+36"
LC
2468
T.P.T.H.
30x24 CLR
2468
144'-10"
17'-10"
PLAN 4 ADA
2" 15'-8"
PLAN 1B
2" 15'-8"
PLAN 3A
2" 15'-8"
PLAN 1A
2" 15'-8"
PLAN 1B
2" 15'-8"
PLAN 1B
23 4" 15'-71
4"
PLAN 3B
2" 15'-8"
PLAN 1
2" 16'-0"
PLAN 3 END
12'-3"15'-8"
40'-0" 1'-0"2'-0"
39'-0"
52'-6"
11'-6"
2'-0"
41'-0"
144'-10"
111'-2"33'-8"
4'-1"16'-0"15'-8"17'-10"
1'-0" 8'-6"13'-41
2"15'-0"
15'-10" 16'-0"
UPPER FLOOR PLAN
BLDG. C (BLDG. B SIM.) 5992 SQ. FT. NORTH
BLDG. C0 5 302010
1'-0"
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE: 1/8" = 1'-0"SCALE:
BLDGS. B & C CONCEPTUAL UPPER FLOOR PLAN
A3.2.3
1/8" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\BLDG_1\FP\317074_BLDG.1 FP.dwg, TYPE A BLDG. 2-3 UPPER FLOOR PLAN, 1/28/2026 10:01:00 AM, 02/16/2024 - PROGRESS SET 6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
CONCEPTUAL
HVAC UNIT
LOCATION
6:12
6:12
6:12
6:12
6:12
6:12
ROOF PLAN
BLDG. C (BLDG. B SIM.) NORTH
BLDG. C0 5 302010
6:12
6:12
6:12
6:12
6:12
CONCEPTUAL
ROOF VENT LOCATION
6:12
SEE SOLAR PANEL
PLAN FOR EXACT
LOCATION
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE: 1/8" = 1'-0"SCALE:
A3.2.4 - BLDGS. B & C _CONCEPTUAL ROOF PLAN
A3.2.4
1/8" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\BLDG_1\RP\317074_BLDG.1 RP.dwg, TYPE A BLDG. 2-3 _ROOF PLAN, 1/28/2026 10:01:06 AM, 02/16/2024 - PROGRESS SET 9'-1"
GROUND S.O.G.
GROUND PLATE
MAIN SUBFLR.
MAIN PLATE
UPPER SUBFLR.
UPPER PLATE
9'-1"
±39'-0"
F F F
9'-1" 9"
31'-2"
F
A
A4.1.0
A
A4.1.0
B
A4.1.0
B
A4.1.0
FRONT ELEVATION
BLDG. C WEST ELAVATION ( BLDG. B SIMILAR )
SIDE ELEVATION
BLDG. C NORTH ELEVATION ( BLDG. B SIMILAR )
F
9'-1"
GROUND S.O.G.
GROUND PLATE
MAIN SUBFLR.
MAIN PLATE
UPPER SUBFLR.
UPPER PLATE
9'-1"
±39'-0"
9'-1" 9"
31'-2"
REAR ELEVATION
BLDG. C EAST ELEVATION ( BLDG. B SIMILAR )
SIDE ELEVATION
BLDG. C SOUTH ELEVATION ( BLDG. B SIMILAR) )
TOP OF FENCE AT
PROPERTY LINE
TOP OF RETAINING WALL
AT PROPERTY LINE
6'-0"
3'-0"
MATERIAL SPECIFICATIONS
· COMPOSITION SHINGLE ROOFING
· 5" OGEE GSM GUTTER
· PARAPET WALL w/ GSM COPING CAP
· SECTIONAL ROLL-UP GARAGE DOOR
· FIBERGLASS FRONT DOOR
· DUAL GLAZED VINYL WINDOW
· METAL METER CABINET DOORS
· STUCCO
· LAP SIDING
· BOARD & BATTEN SIDING
· WOOD TRIM, CORBELS & KICKERS
· WOOD RAILING
· WOOD TRELLIS
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE: 1/8" = 1'-0"SCALE:
BLDGS. B & C _CONCEPTUAL ELEVATIONS
A3.2.5
1/8" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\BLDG_1\EE\317074_BLDG.1 EE.dwg, BLDGS.B&C ELEV, 1/28/2026 10:01:25 AM, 02/16/2024 - PROGRESS SET
EAST ELEVATION
TRASH ENCLOSURE SLAB PLAN
BLDG. AREA: 448 SQ. FT.
18'-8"
TRASH ENCLOSURE ELEVATIONS
TRASH ENCLOSURE PLAN
18'-8"
24'-0"
6" CMU WALL
TRASH ENCLOSURE ROOF PLAN
4:12
2% SLOPE MAX.
3" TALL CURB STOP
SOUTH ELEVATIONWEST ELEVATION NORTH ELEVATION
FENDERS AT TRASH
ROOM WALLS
(P) PAPER
RECYCLE
3 YD.
BIN
(C) CONTAINER
RECYCLE
2 YD.
BIN
1'-0" 1'-0"
(T) TRASH
3 YD.
BIN
(T) TRASH
3 YD.
BIN
1'-0"1'-5"
3'-11" (O) ORGANICS
2 YD. BIN
7'-4"
7'-10"
1'-0"1'-5"
1'-0" 3'-11" 1'-0"
7'-4"3'-11"
6"6"
6"6"
PR 4070 DR
9'-8"
GROUND S.O.G.
±15'-0" MAX.
TOP OF CMU WALL
9'-8"
GROUND S.O.G.
±15'-0"
TOP OF CMU WALL
GROUND BOLT SYSTEM AT
ONE DOOR
PAIR WOOD BARN DOORS
BARN LIGHT TYP.
COMPOSITION SHINGLE ROOF TYP.
METAL MESH SCREEN
VENTILATION
COMPOSITION SHINGLE
ROOF TYP.
5FT. DIAM RADIUS
FLOOR DRAIN.
9" RAKE
1'-2" EAVE
GSM GUTTER
4:12
GSM GUTTER
6"
24'-0"
1'-6"
1'-0"
24'-0"
METAL MESH SCREEN GABLE VENTILATION
LINE OF 6" CMU WALL
LATCHING SYSTEM
STUCCO FINISH
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE:
CONCEPTUAL TRASH ENCLOSURE PLANS
A3.3.1
1/4" = 1'-0"
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Bldgs\Trash Enclosure\317074_Trash Enclosure.dwg, TRASH ENCLOSURE, 1/28/2026 10:01:33 AM, 02/16/2024 - PROGRESS SET NOTE:
· PER MOUNTAIN VIEW GREEN BUILDING STANDARDS, LEED GOLD, 110 POINTS FOR GREEN POINT RATED EQUALS THE REQUIREMENTS SET FORTH.
· PROJECT TO MEET MOUNTAIN VIEW REACH CODE REQUIREMENTS
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
SCALE:
GREENPOINT CHECKLIST
A4.1.6
NTS
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\Green Checklist\317074_GRN CKLIST.dwg, GREENPOINT CHECKLIST, 1/28/2026 10:01:56 AM, 02/16/2024 - PROGRESS SET DEC. 21 3PM
DEC. 21 NOON
DEC. 21 9 AM
JUNE 21 3PMJUNE 21 NOONJUNE 21 9 AM
SCALE:
SHADOW STUDY
A4.1.7
1/16" = 1'-0"
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 950 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CA 94043
6/19/2023
317074
Z:\317074_Mountain_View_3\Dwgs\DR-SD\Dwgs\SP\317074_SP SHADOW STUDIES.dwg, SHADOW STUDY, 1/28/2026 10:02:04 AM, 02/16/2024 - PROGRESS SET
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 944 SAN LEANDRO ST.
MOUNTAIN VIEW, CA 94043
12/12/2023
317074
AVE.
LEGEND
10’-0”
10’-0”
18’-0”
7’-0”
4’-0”
9’-0”
4’-0”4’-0”
18 16 18 25 1924
9712
18 181326 2625 23
19 13 25 312 2
16 15
21 27
4 23
1 28
17 11
16 22
17 5
18 6
20 22
20 6
22 20
6 22
17 25
19 5
8 14
10 Project Entry with Stamped Concrete
City Park Trail
Pilaster with Project and Park Signage
Public Sidewalk and Parkway
Concrete Sidewalk
Front Patio Fence and Gate
Open Space Entry Portal
Open Lawn (50’ x 23’)
Mailbox Clusters
Social Area with Enhanced Paving
Herb Garden
Bike Rack and Fix-it Station
Transformer
Trash Enclosure
Street Tree
Specimen Tree
Flowering Accent Tree
Screening Vine/Hedge
Common Area Shrub Planting
Private Yards
Pedestrian Sight Triangle
Fire Ladder Pad
Silva Cell Stormwater Treatment Sub-structure
Existing London Plane Trees to Remain along
Northern Property Line
Proposed Perimeter Fence (Temporary at
Future Park)
Conceptual Public Art (Refer to L-5 and L-11)
Vehicle Sight Triangle
Bike Ramp with Splitter Island per Civil Engineer
1 2
3 4
5 6
7 8
11 14
17 18
19 20
21 22
24 23
25 26
27 28
9 12
15 10
13 16
L-1
06.17.2025
0 8’ 16’ 32’
Scale: 1/16”= 1’-0”
CONCEPTUAL SITE PLAN
EXISTING NEIGHBORHOOD
SAN LEANDRO AVE
FUTURE PARK
BLDG A
BLDG B
BLDG C
BLDG D
922 - 950
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 944 SAN LEANDRO ST.
MOUNTAIN VIEW, CA 94043
12/12/2023
317074
AVE.
L-2
06.17.2025
CONCEPTUAL DESIGN IMAGERY
922 - 950
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 944 SAN LEANDRO ST.
MOUNTAIN VIEW, CA 94043
12/12/2023
317074
AVE.
SAN LEANDRO AVE
EXISTING NEIGHBORHOOD
FUTURE PARK
LEGEND
Vehicular
Bicycle
Pedestrian
Trash Vehicle Turning Radius
BLDG A
BLDG B
BLDG C
BLDG D
L-3
06.17.2025
CONCEPTUAL CIRCULATION PLAN
0 8’ 16’ 32’
Scale: 1/16”= 1’-0”
922 - 950
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 944 SAN LEANDRO ST.
MOUNTAIN VIEW, CA 94043
12/12/2023
317074
AVE.
SAN LEANDRO AVE
EXISTING NEIGHBORHOOD
FUTURE PARK
LEGEND
DETAILS
Front Yard Fence (3’-0”ht.)
Front Yard Gate (3’-0”ht.)
Perimeter Fence (6’-0”ht.) *
Retaining Wall (ht. per civil)
Front Yard Fence - Wood
Color: SW7005 Pure
White
Front Yard Gate - Wood
Color: SW7005 Pure White
Perimeter Fence - Wood and Metal Meshing
Color: SW7048 Urbane Bronze or Equal
Retaining Wall
Acker-stone Sapphire Wall or Equal
Temporary Fence
on West Property
Line until Park
Opens.
Note: *Fence will be 3’ tall along the front setback
of the San Leandro Street property line.
BLDG A
BLDG B
BLDG C
BLDG D
L-4
06.17.2025
CONCEPTUAL WALL AND FENCE PLAN
0 8’ 16’ 32’
Scale: 1/16”= 1’-0”
922 - 950
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 944 SAN LEANDRO ST.
MOUNTAIN VIEW, CA 94043
12/12/2023
317074
AVE.
trade.com
4 slat adirondack
collection:
adirondack
material:
100% recycled
HDPE
back options:
use with:
4 slat ottoman
shipped knocked down
some assembly required
flat curve
black: color code BL
leaf: color code LG apple: color code AR
sky: color code SB
navy blue: color code NBdriftwood: color code DW
cloud: color code CW
sunset: color code OR
charcoal: color code CG
product details: see backside
designs.com
trade.com
lollygagger
cocktail tables
flat pack shipped
some assembly required
collection:
accent tables
material:
100% recycled
HDPE
black: color code BL
leaf: color code LG apple: color code AR
sky: color code SB
navy blue: color code NBdriftwood: color code DW
cloud: color code CW
sunset: color code OR
charcoal: color code CG
also available:
matching end tables
product details: see backside
lollygagger
cocktail table
(rectangle 42)
lollygagger
cocktail table
(rectangle)
lollygagger
cocktail table
(round)
designs.com
Victor Stanley - Camille (or Equal)
Color:
Bench
8’-6”
13’-0”
10’-0”
8’-0”
4’-0”
5’-0” Max.
L-5
06.17.2025
CONCEPTUAL SITE AMENITIES
MailboxUSAVictor Stanley (or Equal)
Flag Stone Pattern
Metal Frame with Metal Leaf Decoration
Final Design Per Artist
LOLL (Or Equal)
Mailbox ClusterBike Rack
Stamped Concrete At Entry
Social Area Seating
Open Space Entry Portal Conceptual Public ArtEntry Pilaster 922 - 950
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 944 SAN LEANDRO ST.
MOUNTAIN VIEW, CA 94043
12/12/2023
317074
AVE.
SAN LEANDRO AVE
EXISTING NEIGHBORHOOD
FUTURE PARK
Existing Tree Coverage
Note:
Refer to TREE INVENTORY REPORT (dated November 29, 2023) for species, size, health, and structural condition information. The management of the 10 off-site trees should include the detailed Tree Protection Measures as outlined in the report, including the installation of Tree Protection Fencing.
If any branches overhang the site should require pruning, pruning would need to adhere to the ISA Tree Pruning Standards as listed on page 24. 5,804 SF 7.6%
31 Total 94
Heritage Tree: 2:1
Non-heritage Tree: 1:1
Total Required Trees: 36
Requirment:
1,211 SF 1.6%
4,984 SF 6.5%
17,485 SF 22.8%
Coverage at Construction Completion
5 to 10 Year Coverage
Full Growth Coverage
TREE SYMBOLS
TREE REMOVED
TREE REMOVAL MITIGATION
TREE PROPOSED
PERCENTAGE LOT COVERAGE
(LOT AREA : 76,540 SF)
BLDG A
BLDG B
BLDG C
BLDG D
L-8
06.17.2025
CANOPY COVERAGE PLAN
922 - 950
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 944 SAN LEANDRO ST.
MOUNTAIN VIEW, CA 94043
12/12/2023
317074
AVE.
SAN LEANDRO AVE
EXISTING NEIGHBORHOOD
FUTURE PARK
SS
SS
SS
SS
SD SD
SDJT JT JT
JT
JT
JT JT JT JT JT JT JT JT JT JT JT JTSVC
SVC
SVC
JT
CA CA CA CA
CACACACACACA
CACACA CACA CA
CACACACACACA
CA
CA
CACA
CA
CA
CA
CA
CA
CA
CA
CA
CA CACA
CA
CA
CA
CA
CA
CA
CA
CA
SS
SS
SS
SS
SD SD
SDJT JT JT
JT
JT
JT JT JT JT JT JT JT JT JT JT JT JTSVC
SVC
SVC
JT
CA CA CA CA
CACACACACACA
CACACA CACA CA
CACACACACACA
CA
CA
CACA
CA
CA
CA
CA
CA
CA
CA
CA
CA CACA
CA
CA
CA
CA
CA
CA
CA
CA
BLDG A
BLDG B
BLDG C
BLDG D
L-9
06.17.2025
PRELIMINARY PLANTING PLAN
922 - 950
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 944 SAN LEANDRO ST.
MOUNTAIN VIEW, CA 94043
12/12/2023
317074
AVE.
L-10
06.17.2025
PRELIMINARY PLANT IMAGERY
922 - 950
C H U N T H A L E J O N E S A R C H I T E C T S
DATE:
PROJECT:
ARBOR SQUARE
CITY VENTURES
922 - 944 SAN LEANDRO ST.
MOUNTAIN VIEW, CA 94043
12/12/2023
317074
AVE.
SAN LEANDRO AVE
EXISTING NEIGHBORHOOD
FUTURE PARK
KEYMAP
PERSPECTIVE A PERSPECTIVE B
PERSPECTIVE DPERSPECTIVE C
A
B
D
C
L-11
06.17.2025
CONCEPTUAL PERSPECTIVES
922 - 950
EX 30" SD
EX 30" SD
EX SD
EX 8" SS
EX 16" SS
EX 15" SS
EX 12" W EX 12" W
EX 15" SS
EX 15" SS
EX 24" GAS
EX 24" GAS
EX 24" GAS
EX 12" W
SAN LEANDRO AVENUE
REMOVE EXISTING BUILDING
14,140± SF
REMOVE EXISTING
BUILDING
1,465± SF
REMOVE EXISTING
CHAIN LINK FENCE
PROTECT EXISTING
FIRE HYDRANT
X
LANDS OF GARLIEPP TRUST
APN 153-18-031
LOT 62 (W M 56)
LANDS OF MOUNTAIN VIEW
ASSOCIATES, LLC AND
MEHRTRENS TRUST
APN 153-18-026
LOT 61 (W M 56)
EASEMENT FOR
PUBLIC USE AS STREET
AND PUBLIC UTILITIES
REMOVE CLEANOUT, ABANDON
EXISTING SEWER LATERAL
REMOVE VALVE, ABANDON
EXISTING WATER LATERAL
REPLACE EXISTING
STREETLIGHT
REMOVE WATER METER,
ABANDON EXISTING
WATER LATERAL
ABANDON EXISTING
STORM DRAIN
ABANDON EXISTING
WATER, SEWER, AND
GAS LATERALS
REMOVE EXISTING
BUILDING
1,170± SF
REMOVE
EXISTING
BUILDING
325± SF
REMOVE
EXISTING
BUILDING
370± SF X
X
X X X
X
X
X
XX
X
X
X
X
XXXXXXXXXX
X
X
X
X
X
X X
REMOVE EXISTING
TREE STUMP
EXISTING JOINT
POLE TO REMAIN EXISTING JOINT
POLE TO REMAIN
EXISTING JOINT
POLE TO REMAINTREE #101
TREE #102
TREE #103
TREE #104
TREE #105
TREE #106
TREE #107
TREE #108
TREE #109
TREE #129
TREE #130 TREE #110
TREE #111 TREE #113
TREE #112
TREE #114 TREE #116 TREE #118 TREE #120
TREE #115 TREE #117 TREE #119 TREE #121
TREE #125
TREE #128
TREE #127
TREE #126
TREE #131
TREE #124
TREE #122TREE #123
EXISTING TRANSFORMER
SERVING SITE TO BE
REMOVED
RELOCATE ALL REMAINING BOXES
OFF THE SIDEWALK. TYPICAL
C H U N T H A L E J O N E S A R C H I T E C T S
ArchitecturePlanningInteriors
444 Spear Street, Suite 105
San Francisco, CA 94105
www.hunthalejones.com
t. 415-512-1300
f. 415-288-0288
DATE:
PROJECT:
ARBOR SQUARE
922 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CALIFORNIA
06.12.2025
2300073.10
ENGINEER: MICHAEL VIDRA
LICENSE NO: 076690
LEGEND:
EXISTING CONDITIONS AND DEMOLITION PLAN
C2.0
PROJECT BOUNDARY
EXISTING RIGHT OF WAY
CENTERLINE
EXISTING EASEMENT
EXISTING WATER LINE
EXISTING STORM DRAIN
EXISTING SANITARY SEWER
EXISTING SIDEWALK/PAVEMENT
ASPHALT TO BE REMOVED
CLEAR AND GRUB
NOTES:
1. ALL STRUCTURES, HARDSCAPE, UTILITIES, SIGNS, AND FENCES WITHIN DEMOLITION BOUNDARY TO BE REMOVED.
2. ALL UTILITIES WITHIN SITE ARE TO BE CUT AND CAPPED AT DEMOLITION BOUNDARY OR PER UTILITY AGENCY DIRECTION.
3. ENTIRE SITE WITHIN DEMOLITION BOUNDARY TO BE CLEARED AND GRUBBED AFTER REMOVAL OF HARDSCAPE UNLESS OTHERWISE NOTED.
X
EXISTING CHAIN LINK FENCE
ASPHALT GRIND AND OVERLAY
TREE TO BE REMOVED
Graphic Scale (in feet)
20 400 20
1 inch = 20 ft.
TREE SURVEY
TREE NO. TRUNK DBH
(IN)
SPECIES COMMON
NAME RECOMMENDATION HERITAGE
101 3,3,4,6,13 PURPLE LEAF PLUM REMOVE NO
102 2,2,2,4 PURPLE LEAF PLUM REMOVE NO
103 3,4,5,6,6,8,10 PLUM REMOVE NO
104 2,3,4,4, GLOSSY PRIVET REMOVE NO
105 5,10,12,12 PURPLE LEAF PLUM REMOVE NO
106 5 PLUM REMOVE NO
107 6,13 PURPLE LEAF PLUM REMOVE NO
108 2,2,3,4,5 GLOSSY PRIVET REMOVE NO
109 5,8,10 SHINY XYLOSMA REMOVE NO
110 14 SHINY XYLOSMA REMOVE NO
111 11 EVERGREEN PEAR REMOVE NO
112 14,23 EVERGREEN PEAR REMOVE NO
113 3,3,4,4,5 GLOSSY PRIVET REMOVE NO
114 3,3,4,5,6 GLOSSY PRIVET REMOVE NO
115 4,4 VIBURNUM REMOVE NO
116 4 EVERGREEN PEAR REMOVE NO
117 10 EVERGREEN PEAR REMOVE NO
118 4,5,5,6,9 GLOSSY PRIVET REMOVE NO
119 14 EVERGREEN PEAR REMOVE NO
120 5,5,6,6,6,8 GLOSSY PRIVET REMOVE NO
121 12 EVERGREEN PEAR REMOVE NO
122 28 MEXICAN FAN PALM REMOVE NO
123 5,6,7 GRAPEFRUIT REMOVE NO
124 3,4 LEMON REMOVE NO
125 23 FRUITLESS MULBERRY REMOVE NO
126 7,10 PERSIMMON REMOVE NO
127 16 JAPANESE LOQUAT REMOVE NO
128 13,13 ENGLISH WALNUT REMOVE NO
129 14 ALMOND REMOVE NO
130 4 VIBURNUM REMOVE NO
131 18 BLACK WALNUT REMOVE NO
CONCRETE TO BE REMOVED
922 - 950
YES
YES
YES
YES
YES
C STREET
(PRIVATE STREET)
SAN LEANDRO AVENUE
PAD MOUNT
TRANSFORMER
BUILDING D BUILDING C BUILDING B BUILDING A
TRASH
ENCLOSURE
1 2
3 4
5 6
7 8
9 10
18 17
16 15
14 13
12 11
19 21
22 23
24 25
26 27
28 20
38 37
36 35
34 33
32 31
30 29
A STREET
(PRIVATE STREET)
B STREET
(PRIVATE STREET)
A STREET
(PRIVATE STREET)
R=31.0'
9.0'
TYP.
18.0'
TYP.
LOT 1
1.69 AC±
21.0'
TBC-TBC
21.0'
TBC-TBC
20.0'
TC-TC
4.0'
4.0'
4.0'
5.0'
SETBACK
17.17'
SETBACK
20.0'
SETBACK
7.0'
CONNECTION TO
FUTURE PARK
RET WALL
3' MAX
RET WALL
3' MAX
20.0'TC-TC
R=20.0'
R=30.0'
R=21.0'
R=21.0'
R=21.0'
16.0'
R=21.0'R=20.0'
7.4'±
24.0'
4 PARKING STALLS 3 PARKING
STALLS
3 PARKING
STALLS
5'5'5' 5'
1.0'
1.0'
6" CURB AROUND ALL
PARKING STALLS, TYP.
18.0'
TYP.
16.0'
25.0'
30.0'
EXISTING RIGHT OF WAY
PER W M 56
PROPOSED RIGHT OF WAY
AFTER DEDICAITON
12.5'PAE
4 PARKING STALLS
10.0'
45.0'
SETBACK
ACCESSIBLE UNIT
ACCESSIBLE UNIT ACCESSIBLE UNIT
ACCESSIBLE UNIT
REPLACE EXISTING STREETLIGHT
PEDESTRIAN SIGHT TRIANGE
PEDESTRIAN
SIGHT TRIANGE
VEHICLE SIGHT TRIANGE
50.0'
EXISTING RIGHT OF WAY
PER W M 56
ENTRY
MONUMENT
BICYCLE PARKING
10' CONCRETE
STRESS PAD
BLIND SPOT
MIRRORS
RET WALL
3' MAX
PAD MOUNT
TRANSFORMER
BIKE RAMP WITH
SPLITTER ISLAND
END FENCE
END RETAINING WALL
BICYCLE
PARKING
FIRE BFP
DOMESTIC WATER BFP
IRRIGATION BFP
C H U N T H A L E J O N E S A R C H I T E C T S
ArchitecturePlanningInteriors
444 Spear Street, Suite 105
San Francisco, CA 94105
www.hunthalejones.com
t. 415-512-1300
f. 415-288-0288
DATE:
PROJECT:
ARBOR SQUARE
922 SAN LEANDRO AVENUE
MOUNTAIN VIEW, CALIFORNIA
06.12.2025
2300073.10
ENGINEER: MICHAEL VIDRA
LICENSE NO: 076690
Graphic Scale (in feet)
20 400 20
1 inch = 20 ft.
LEGEND:
SITE PLAN
C3.0
PROJECT BOUNDARY
EXISTING RIGHT OF WAY
CENTERLINE
EXISTING CURB & GUTTER
PROPOSED CURB & GUTTER
PROPOSED SIDEWALK
PROPOSED EASEMENT
PROPOSED PAVEMENT
EXISTING WATER LINE
EXISTING STORM DRAIN
EXISTING SANITARY SEWER
NOTES:
1. FIRE ROADS SHALL BE ALL WEATHER SURFACE CAPABLE OF
SUPPORTING THE IMPOSED LOAD OF FIRE APPARATUS WEIGHT AT LEAST 75,000 POUNDS.
2. ALL SIGNING AND STRIPING SHALL CONFORM TO THE LATEST
PROVISIONS OF CA MUTCD, CALTRANS STANDARD PLANS AND
SPECIFICATIONS, AND THE CITY OF MOUNTAIN VIEW STANDARD
DETAILS.
3. PARKING STALLS SHALL BE IDENTIFIED BY FOUR INCH WIDE STRIPES.
4. PARKING STALLS SHALL HAVE 6" CURB AROUND PARKING STALLS.
PROPOSED STAMPED CONCRETE
SIGHT TRIANGLE
PROPOSED FENCE
TYPICAL PARKING STALL STRIPING
PARKING STALLS SHALL ADHERE TO CITY OF
MOUNTAIN VIEW MUNICIPAL CODE SECTION 36.32.80
9.0'
18.0'
6" CONCRETE CURB
4" WIDE STRIPES
DOUBLE STRIPE
PER FIGURE 36.32-2
ACCESSIBLE PATH OF TRAVEL
9.0'
PARKING COUNT:
STANDARD VEHICLE PARKING (9'x18'): 12 STALLS
ACCESSIBLE VEHICLE PARKING (9'x18'): 2 STALLS
BICYCLE PARKING: 2 SPACES
PROPOSED TREE
WHEEL STOP
PROPOSED CONCRETE
PROPOSED ASPHALT GRIND AND OVERLAY
922 - 950
SHEETS
SHEET
OF
NOT FOR CONSTRUCTION
PRELIMINARY
NOT TO SCALE
JOB NO.:
DRAWN:SCALE:
DATE:
CHECKED:
INTENT TO CONSTRUCT
NO. DATE
KT
December 2023
223157
AR
REVISIONS BY
DATE LAST WORKED ON: 6/18/2025
813 First Street
Brentwood, CA 94513
(925) 240-2595
(925) 240-7013 fax
www.tarrar.com
· Planning
· Design
· Estimating
· Joint Trench
· Street Lighting
· Fiber Optic
· T-24
· PG&E Gas Design
· PG&E Elec Design
· M.E.P. Design
· Cost Analysis
· Due Diligence
U U
G GROUN
ROUN
NDNDE ER R ALAL
D D R RSE VI CE
VI CE
E
R
E
R
FEB FEB
CAL
CALL L DD
OO
UU
RERE YOYO
T T
IGIG
922 - 950 SAN LEANDRO AVENUE