Murrieta Public Library Expansion

Building Plan Options Exhibit
June 18, 2024

Exhibit A

• ~5,000 sf
• All-In Project Costs
o With Full Exterior Construction: $9.86 Million
o With Minimal Exterior Construction: $8.44 Million
• Includes Maker Space

Exhibit A

Exhibit A : Full Exterior Design

Exhibit B

• ~4,500 sf
• Minimal Exterior Construction
• All-In Project Costs: $7.05 Million
• Eliminates Maker Space
• Staff office and programming preparation space reduced. • Butterfly roof replaced with traditional roof design.
• Rearranges rooms into more cohesive building footprint. o Restroom & Storage moved to plan side north.
o Multi-purpose rooms moved to plan side south.
o Angle consistent with main building and avoids fault line setback.

Exhibit B

Exhibit B

Exhibit B

Exhibit B

Exhibit C

• ~4,200 – 4,300 sf
• Minimal Exterior Construction
• All-In Project Costs: $6.51 Million
• Eliminates Maker Space
• Butterfly roof replaced with traditional roof design.
• Reduces stacks by ~150 sf.
• Reduces staff programming preparation space by ~150 sf.

Exhibit C