Cities Index.
ATT 1 - Quote for Beam EV ARC

Murrieta City Council
January 21, 2025

Document
ATT 1 - Quote for Beam EV ARC
Meeting
January 21, 2025
Body
Murrieta City Council
Original file
273 KB
Text extracted from the city's file for reading and search. Open the original on murrieta.legistar1.com. That file is the official record.

BeamForAll.com
[email protected]
+1 858-799-4583
Beam Global
5660 Eastgate Drive
San Diego, CA 92121

Your EV ARC™ is an American-made product and will be
fabricated in our San Diego, California facility.

EV ARC™ systems are capable of generating and storing enough clean, solar electricity to charge up to 265 e-miles in a single day.

Thanks to its battery storage, it can charge electric vehicles day or night, or even during periods of cloudiness, and is also an excellent source of emergency/alternative power. The electricity produced is clean and renewable, reducing 100% of greenhouse gas emissions from ICE vehicles and electric vehicles powered from the utility grid.

The EV ARC™ is deployed in minutes without any construction or electrical work and does not require civil or electrical engineering, foundations, trenching, electrical connections or upgrades. It will produce energy reliably and consistently but will not generate a utility bill or fail to operate because of a black out or other utility grid failure.

It’s no wonder that Google, the City of New York, the State of California and many others across the U.S. and internationally trust the EV ARC™ product line to charge their electric vehicles.

The patented EV ARC™ charging system is the world’s first and only fully autonomous, transportable, solar-powered electric vehicle charging system. Designed, engineered and manufactured in the U.S., the EV ARC™ measures 7.5' X 18' at the base and fits inside a standard parking space without reducing available parking while being ADA compliant.

EV ARC Product Description™
(858) 201-5530Phone
[email protected]
Jason KellerPrepared By
One Town Square, 24601 Jefferson Ave
Murrieta, CA 92562
Ship To
City of MurrietaShip To Name
One Town Square, 24601 Jefferson Ave
Murrieta, CA 92562
Bill To
City of MurrietaBill To Name
(951) 461- 6001 ext. 6219Phone
[email protected]
Management AnalystTitle
Andree KinneyContact Name
City of MurrietaCustomer Name
11/7/2024Created Date
00001759Quote Number
Beam EV ARC  Proposal via CA DGS Contract #1-22-61-16™
Customer Details
Billing and Shipping
Your Clean Mobility Expert
BeamForAll.com
[email protected]
+1 858-799-4583
Beam Global
5660 Eastgate Drive
San Diego, CA 92121

EV ARC Diagram™
BeamForAll.com
[email protected]
+1 858-799-4583
Beam Global
5660 Eastgate Drive
San Diego, CA 92121

Applicable sales tax will be billed upon invoicing
Payment Terms: Net 30 days

ONE-PAY LEASE OPTION: This proposal includes an option to lease the quoted EV ARC™ Equipment, which includes the EV ARC™ Base Model, EV charger, and the add-ons of battery storage upgrades, Emergency Power Panel, AC/USB outlets, Grid Connect and RMMS connectivity, for a five-year term at a cost of 60% of the Total Equipment Price. Total Equipment Price excludes Shipping & Handling, Sales Tax, Beam Stow Kit, ARC Mobility™ Trailer, which will be invoiced at the amounts presented in this proposal. The lease option includes a 5-year warranty on the EV ARC™ Base Model and add-ons, and a 1-year warranty on the EV charger. The One-Pay Lease amount of 60% of the Total Equipment Price will be invoiced upon Equipment delivery on payment terms of net 30 days. Beam Global will retain title to the Equipment, and the Customer is responsible for insuring the Equipment during the term of the lease. The lease will expire five years from the date of Equipment 2/7/2025Expiration Date
$177,695.05Grand Total
$14,021.33Tax
$0.00Shipping and
Handling
$163,673.72Total PriceShipping & Handling is FOB Destination and includes Beam Team performing un-load / un-stow of equipment. Customer may need a 12K capacity forklift onsite upon delivery; to be determined when delivery date is scheduled.

EV ARC Pricing™
Product Product Code Product Description Quantity List Price Total Price Beam EV
ARC™ with
ChargePoint™
dual plug
charger
ARC2020-CP4023
EV ARC™ 2020, 4.3kW solar array, 22kWh expandable
storage, BeamTrak™, Chargepoint CT4023 dual-plug
networked charger, dual J1772 connectors. 12 months
ChargePoint Network Operating System (NOS) included.

CLIN #1101, includes 2% CA DGS Contract discount.

2.00 $70,300.30 $140,600.60
Beam Boost
battery
upgrade
BOOST40
Beam Boost upgrade for EV ARC™ 2020 systems increases
battery storage to 43 kWh.

CLIN #1201, includes 2% CA DGS Contract discount.

2.00 $9,821.56 $19,643.12
Remote
Monitoring
and
Management
System
(RMMS)
5-Year
Extension
RMMS-5
Five-year (5 year) prepaid plan for the Remote Monitoring and Management System (RMMS) provides login access to view
data and status of the EV ARC system. 4G LTE and WiFi
connections enable remote monitoring of solar energy
production, battery status, energy output, energy use session data. Remote performance assessment and troubleshooting can prevent service calls. Service is included for the 1st twelve (12) months with purchase of an EV ARC™ system; 5-year
prepaid plan discounts the annual cost.

CLIN #1301, includes 2% CA DGS Contract discount.

2.00 $1,715.00 $3,430.00
Manufacturer
Warranty - 1
Year
WARRANTY-MFGR-01 Manufacturer Warranty - First year included 2.00 $0.00 $0.00 Totals
BeamForAll.com
[email protected]
+1 858-799-4583
Beam Global
5660 Eastgate Drive
San Diego, CA 92121

https://caleprocure.ca.gov/PSRelay/ZZ_PO.ZZ_CTR_SUP_CMP.GBL?Page=ZZ_CTR_SUP_PG&Action=U&SETID=STATE&CNTRCT_ID=1-22-61-16 delivery. At that time, the Customer will have the option to either renew the lease for another 5 years at 60% of the Total Equipment Price; or purchase the Equipment at 65% of the Total Equipment Price; or have Beam Global pick up and remove the Equipment for a recycling fee of 10% of the Total Equipment Price. The One-Pay Lease program is offered through March 31, 2025. Customer agrees and acknowledges that the terms set forth above are only a summary of the terms and conditions of the lease agreement, and any lease of EV ARC™ Equipment will not be effective until Customer and Beam Global have entered into a definitive lease agreement for the quoted EV ARC™ Equipment. To get started with the One-Pay Lease, contact your Clean Mobility Expert on this proposal.

California DGS Contract Link

← All documents from this meeting