CITY OF MURRIETA, POLICE DEPARTMENT

CONTRACT

EXTERIOR PAINTING OF POLICE STATION
CITY PROJECT NO. 21016
THIS CONTRACT, made and entered into the day of _ 20 by and between the City of Murrieta, a municipal corporation, hereinafter referred to as "CITY," and Mariscal Painting Inc. , hereinafter referred to as "CONTRACTOR." WITNESSETH:

That CITY and CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:

1. CONTRACT DOCUMENTS. The complete Contract includes all of the Contract Documents, to wit:

Included •N/A Notice Inviting Bids and Instructions to Bidders XIncluded •N/A Proposal
Included ON/A Labor and Materials Bond
Included •N/A Performance Bond
Scope of Work for EXTERIOR PAINTING OF POLICE STATION,
Included •N/A
CITY PROJECT NO. 21016
Included •N/A Insurance Forms
included ON/A This Contract, and all modifications and amendments thereto.

The Plans consist of:

The document entitled Scope of Work for:

EXTERIOR PAINTING OF POLICE STATION
City Project No. 21016
In case of conflict between the Standard Specifications for Public Works Projects and the remaining Contract Documents, the remaining Contract Documents shall take precedence over and be used in lieu of such conflicting portions.

Where the Plans or Specifications describe portions of the work in general terms, but not in complete detail, it is understood that the item is to be furnished and installed completed and in place and that only the best general practice is to be used. Unless otherwise specified, CONTRACTOR shall furnish • all labor, materials, tools, equipment, and incidentals, and do all the work involved in executing the Contract.

The Contract Documents are complementary, and what is called for by anyone shall be as binding as if called for by all. Any conflict between this Contract and any other Contract Document shall be resolved in favor of this Contract.

C-1

CITY OF MURRIETA, POLICE DEPARTMENT

2. SCOPE OF WORK. CONTRACTOR shall perform the work as identified in the Scope of Work, shall furnish all the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required for the completion of the following project:

EXTERIOR PAINTING OF POLICE STATION
CITY PROJECT NO. 21016
All of said work to be performed and materials to be furnished shall be in strict accordance with the Drawings and Specifications and the provisions of the Contract Documents hereinabove enumerated and adopted by CITY.

3. CITY APPROVAL. All labor, materials, tools, equipment, and services shall be furnished and work performed and completed under the direction and supervision and subject to the approval of CITY or its authorized representatives.

4. CONTRACT AMOUNT AND SCHEDULE. CITY agrees to pay and CONTRACTOR agrees to receive and accept the prices set forth in the proposal as full compensation for furnishing all materials, performing all work, and fulfilling all obligations hereunder.

Said compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of the work during its progress or prior to its acceptance, including those for well and faithfully completing the work and the whole thereof in the manner and time specified in the aforesaid contract documents and also including those arising from actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of the work, suspension or discontinuance of the work, and all other unknowns or risks of any description connected with the work.

CONTRACTOR agrees to complete the work on EXTERIOR PAINTING OF POLICE STATION in a period not to exceed ten (10) working days. Exterior painting is to be completed within 30 days from notice to proceed, commencing upon the date stated in the Notice to Proceed by CITY. Painting shall not commence until CITY has approved bonds and insurance.

5. Section intentionally left blank.

6. PAYMENTS/ACCEPTANCE OF WORK. The text of Subsection 9-3.2 of the Standard Specifications for Public Works Construction is hereby deleted and replaced with the following:

The closure date for the purpose of making partial progress payments will be the last day of each month. CONTRACTOR shall prepare the approximate measurement of the work performed through the closure date and submit it to CITY for approval by the tenth (10th) day of the following month. Payments will be withheld pending receipt of any outstanding reports required by the Contract Documents.

C-2

CITY OF MURRIETA, POLICE DEPARTMENT
A full five percent (5%) retention will be deducted from all progress payments. Partial payments on the Contract price shall not be considered as an acceptance of any part of the work. Upon completion of the work, CONTRACTOR shall so notify Engineer or designee, in writing, submit satisfactory evidence of payment for equipment, materials and labor, submit "CONTRACTOR'S AFFIDAVIT." Upon receipt of the notification, Engineer shall promptly, by personal inspection, determine the actual status of the work in accordance with the terms of the Contract. If he finds materials, equipment, or workmanship that do not meet the terms of the Contract, he shall prepare a preliminary punch list of such items and submit it to CONTRACTOR. Final determination of acceptability shall be made by CITY. Upon acceptance of the work, CITY shall file a Notice of Completion. The conditions of the guarantee shall commence on the date that CITY files a Notice of Completion. CITY shall make final payment to CONTRACTOR in the manner provided by law following the expiration of thirty-five (35) days after filing the Notice of Completion.

The final payment shall include the entire sum found to be due hereunder after deducting all previous payments and such other lawful amounts as the terms of this Contract describe.

7. LIQUIDATED DAMAGES; EXTENSION OF TIME. In accordance with Government Code Section 53069.85, CONTRACTOR agrees to forfeit and pay to CITY the sum of five hundred dollars ($500) per day for each calendar day completion is delayed beyond the time allowed pursuant to paragraph 4 of this Contract. Such sum shall be deducted from any payments due to or to become due to CONTRACTOR CONTRACTOR will be granted an extension of time and will not be assessed liquidated damages for unforeseeable delays beyond the control of and without the fault or negligence of CONTRACTOR, including delays caused by CITY. CONTRACTOR is required to promptly notify CITY of any such delay.

8. WAIVER OF CLAIMS. Unless a shorter time is specified elsewhere in this Contract, on or before making final request for payment under paragraph 6 above, CONTRACTOR shall submit to CITY, in writing, all claims for compensation under or arising out of this Contract; the acceptance by CONTRACTOR of the final payment shall constitute a waiver of all claims against CITY under or arising out of this Contract except those previously made in writing and request for payment.

CONTRACTOR shall be required to execute an affidavit, release, and indemnify agreement with each claim for payment.

9. PREVAILING WAGES. Pursuant to provisions of Section 1773 of the Labor Code of the State of California, the City Council has obtained the general prevailing rate of per diem wages and the general rate for holiday and overtime work in this locality for each craft, classification, or type of workman needed to execute this Contract, from Director of the Department of Industrial Relations. These rates are on file with the City Clerk. Copies may be obtained at cost at the City Clerk's office of Murrieta.

CONTRACTOR shall post a copy of such rates at the job site and shall pay the adopted prevailing wage rates as a minimum.

C-3

CITY OF MURRIETA, POLICE DEPARTMENT
CONTRACTOR shall comply with the provisions of Sections 1773.8, 1775, 1776, 1777.5, 1777.6, and 1813 of the Labor Code. Pursuant to the provisions of 1775 of the Labor Code, CONTRACTOR shall forfeit to CITY, as a penalty, the sum of fifty dollars ($50.00) for each calendar day, or portion thereof, for each laborer, worker, or mechanic employed, paid less than the stipulated prevailing rates for any work done under this Contract, by him or by any subcontractor under him, in violation of the provisions of the Contract.

10. INSURANCE. CONTRACTOR shall procure and maintain for the duration of the Contract insurance against claims for injuries to persons or damages to property that may arise from or in connection with the performance of the project by CONTRACTOR, his agents, representatives, employees, or subcontractors. The cost of such insurance shall be included in CONTRACTOR's bid.

A. Liability Insurance. Before the Contract is executed on behalf of CITY, a bidder to whom the Contract has been awarded shall furnish to CITY original certificates and amendatory endorsements, or copies of the applicable insurance language, effecting coverage required by this contract as listed below. All certificates and endorsements are to be received and approved by CITY before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive CONTRACTOR's obligation to provide them. CITY reserves the right to require complete, certified copies of all required insurance policies, including endorsements, required by these specifications, at any time.

1. Commercial General Liability Insurance: Insurance Services Office Form CG 00 01, including products and completed operations, with limits of no less than $2,000,000 per occurrence for bodily injury, personal injury, and property damage. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.

2. Worker's Compensation insurance as required by the State of California, with Statutory Limits, and Employers' Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.

3. Automobile Liability: Insurance Services Office Form Number CA 0001 covering Code 1 (any auto), with limits no less than $2,000,000 per accident for bodily injury and property damage.

4. Excess or Umbrella Liability Insurance (Over Primary) if used to meet limit requirements, shall provide coverage at least as broad as specified for the underlying coverages. Such policy or policies shall include as insureds those covered by the underlying policies, including additional insureds. Coverage shall be "pay on behalf", with defense costs payable in addition to policy limits.

5. There shall be no cross liability exclusion precluding coverage for claims or suits by one insured against another. Coverage shall be applicable to CITY for injury to employees of CONTRACTOR, subcontractors or others involved in the Work. The scope of coverage provided is subject to approval of CITY following receipt of proof of insurance as required herein.

C-4

CITY OF MURRIETA, POLICE DEPARTMENT
B. Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by CITY. At the option of CITY, either:

CONTRACTOR shall cause the insurer to reduce or eliminate such deductibles or self-insured retentions as respects CITY, its officers, officials, employees, and volunteers; or CONTRACTOR shall provide a financial guarantee satisfactory to CITY guaranteeing payment of losses and related investigations, claim administration, and defense expenses. The insurance policies are to contain, or be endorsed to contain, the following provisions:

1. CITY, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL and automobile liability policies with respect to liability arising out of work or operations performed by or on behalf of CONTRACTOR including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of CONTRACTOR. General liability coverage can be provided in the form of an endorsement to CONTRACTOR's insurance (at least as broad as ISO Form CG 20 10, 11 85 or both CG 20 10 and CG 23 37 forms if later revisions used).

2. For any claims related to this project, CONTRACTOR's insurance coverage shall be primary insurance as respects CITY, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by CITY, its officers, officials, employees, or volunteers shall be in excess of CONTRACTOR's insurance and shall not contribute with it.

3. Each insurance policy required by this clause shall provide that coverage shall not be canceled, except with notice to CITY.

C. Acceptability of Insurers. Insurance is to be placed with insurers with a Bests' rating of no less than A: VII.

D. Waiver of Subrogation. CONTRACTOR hereby agrees to waive rights of subrogation which any insurer of CONTRACTOR may acquire from CONTRACTOR by virtue of the payment of any loss. CONTRACTOR agrees to obtain any endorsement that may be necessary to effect this waiver of subrogation.

E. The Workers' Compensation policy shall be endorsed with a waiver of subrogation in favor of CITY for all work performed by CONTRACTOR, its employees, agents and subcontractors.

F. Subcontractors. CONTRACTOR shall include all subcontractors or shall furnish separate endorsements for each subcontractor. All coverage for subcontractors shall be subject to all the requirements stated herein.

11. TIME OF THE ESSENCE. Time is of the essence in this Contract.

C-5

CITY OF MURRIETA, POLICE DEPARTMENT

12. INDEMNIFICATION. All work covered by this Contract done at the site of construction or in preparing or delivering materials to the site shall be at the risk of CONTRACTOR alone. CONTRACTOR agrees to save, indemnify, hold harmless, and defend CITY, its officers, employees, and agents against any and all liability, injuries, or death of persons (CONTRACTOR's employees included) and damage to property, arising directly or indirectly out of the obligations herein undertaken or out of the operations conducted by CONTRACTOR, save and except claims or litigations arising through the sole active negligence or sole willful misconduct of CITY.

13. CONTRACTOR'S INDEPENDENT INVESTIGATION. No plea of ignorance of conditions that exist or that may hereafter exist or of conditions of difficulties that may be encountered in the execution of the work under this Contract, as a result of failure to make the necessary independent examinations and investigations, and no plea of reliance on initial investigations or reports prepared by CITY for purposes of letting this Contract out to bid will be accepted as an excuse for any failure or omission on the part of CONTRACTOR to fulfill in every detail all requirements of this Contract. Nor will such reasons be accepted as a basis for any claims whatsoever for extra compensation or for an extension of time.

14. GRATUITIES. CONTRACTOR warrants that neither it nor any of its employees, agents, or representatives has offered or given any gratuities or promises to CITY's employees, agents, or representatives with a view toward securing this Contract or securing favorable treatment with respect thereto.

15. CONFLICT OF INTEREST. CONTRACTOR warrants that he has no blood or marriage relationship, and that he is not in any way associated with any CITY officer or employee, or any architect, engineer, or other preparer of the Drawings and Specifications for this project. CONTRACTOR further warrants that no person in his employ has been employed by CITY within one (1) year of the date of Notice Inviting Bids.

16. CONTRACTOR'S AFFIDAVIT. After completion of the work contemplated by this Contract, CONTRACTOR shall file with the City Manager his affidavit stating that all workmen and persons employed, all firms supplying materials, and all subcontractors upon the project have been paid in full, and that there are no claims outstanding against the project for either labor or materials, except certain items, if any, to be set forth in an affidavit covering disputed claims or items in connection with a Stop Notice that has been filed under the provisions of the laws of the State of California.

17. SIGNATURE OF CONTRACTOR.

Corporations:

The signature must contain the name of the corporation, must be signed by the President and Secretary or Assistant Secretary, and the corporate seal must be affixed. Other persons may sign for the corporation in lieu of the above if a certified copy of a resolution of the corporate board of directors so authorizing them to do so is on file in the City Clerk's office.

C-6

CITY OF MURRIETA, POLICE DEPARTMENT
Partnerships:

Names of all persons comprising the partnership or co-partnership must be stated. Bid must be signed by all partners comprising the partnership unless proof in the form of a certified copy of a certificate of partnership acknowledging signer to be a general partner is presented to the City Clerk, in which case the general partner may sign.

Joint Ventures:

Bids submitted as joint ventures must so state and be signed by each joint venturer.

Individuals:

Bids submitted by individuals must be signed by the bidder, unless an up-to-date power of attorney is on file in the City Clerk's office, in which case said person may sign for the individual.

The above rules also apply in the case of the use of a fictitious firm name. In addition, however, where the fictitious name is used, it must be so indicated in the signature.

18. SUBSTITUTED SECURITY. In accordance with Section 22300 of the Public Contracts Code, CONTRACTOR may substitute securities for any monies withheld by CITY to ensure performance under the Contract. At the request and expense of CONTRACTOR, securities equivalent to the amount withheld shall be deposited with CITY or with a State or Federally chartered bank or an escrow agent who shall pay such monies to CONTRACTOR upon notification by CITY of CONTRACTOR's satisfactory completion of the Contract. The type of securities deposited and the method of release shall be approved by the City Attorney's office.

19. RESOLUTION OF CLAIMS. Any dispute or claim arising out of this Contract shall be arbitrated pursuant to Section 10240 of the California Public Contracts Code.

20. NOTICE TO CITY OF LABOR DISPUTES. Whenever CONTRACTOR has knowledge that any actual or potential labor dispute is delaying or threatens to delay the timely performance of the Contract, CONTRACTOR shall immediately give notice thereof, including all relevant information with respect thereto, to CITY.

21. BOOKS AND RECORDS. CONTRACTOR's books, records, and plans or such part thereof as may be engaged in the performance of this Contract, shall at all reasonable times be subject to inspection and audit by any authorized representative of CITY.

22. UTILITY LOCATION. CITY acknowledges its responsibilities with respect to locating utility facilities pursuant to California Government Code Section 4215.

23. REGIONAL NOTIFICATION CENTERS. CONTRACTOR agrees to contact the appropriate regional notification center in accordance with Government Code Section 4216.2.

24. TRENCH PROTECTION AND EXCAVATION. CONTRACTOR shall submit its detailed plan for worker protection during the excavation of trenches required by the scope of the work in accordance with Labor Code Section 6705.

C-7

CITY OF MURRIETA, POLICE DEPARTMENT
A. CONTRACTOR shall, without disturbing the condition, notify CITY, in writing, as soon as CONTRACTOR, or any of CONTRACTOR's
subcontractors, agents, or employees have knowledge and reporting is possible, of the discovery of any of the following conditions:
(1) The presence of any material that CONTRACTOR believes is hazardous waste, as defined in Section 25117 of the Health and Safety Code;
(2) Subsurface or latent physical conditions at the site differing from those indicated in the specifications; or
3) Unknown physical conditions at the site of any unusual nature, different materially for those ordinarily encountered and generally recognized as inherent in work of the character provided for in this Contract.

B. Pending a determination by CITY of appropriate action to be taken, CONTRACTOR shall provide security measures (e.g., tences) adequate to prevent the hazardous waste or physical conditions from causing bodily injury to any person.

C. CITY shall promptly investigate the reported conditions. If CITY, through and in the exercise of its sole discretion, determines that the conditions do materially differ or do involve hazardous waste, and will cause a decrease or increase in CONIRACTOR's cost of, or time required for, performance of any part of the work, then CITY shall issue a change order.

D. In the event of a dispute between CITY and CONTRACTOR as to whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in CONTRACTOR's cost of, or time required for, performance of any part of the work, CONTRACTOR shall not be excused from any scheduled completion date, and shall proceed with all work to be performed under the contract. CONTRACTOR shall retain any and all rights that pertain to the resolution of disputes and protests between the parties.

25. INSPECTION. The work shall be subject to inspection and testing by CITY and its authorized representatives during manufacture and construction and all other times and places, including, without limitation, the plans of CONTRACTOR and any of its suppliers. CONTRACTOR shall provide all reasonable facilities and assistance for the safety and convenience of inspectors.

All inspections and tests shall be performed in such manner as to not unduly delay the work. The work shall be subject to final inspection and acceptance notwithstanding any payments or other prior inspections. Such final inspection shall be made within a reasonable time after completion of the work.

26. DISCRIMINATION. CONTRACTOR represents that it has not, and agrees that it will not, discriminate in its employment practices on the basis of race, creed, religion, national origin, color, sex, age, or handicap.

27. GOVERNING LAW. This Contract and any dispute arising hereunder shall be governed by the law of the State of California.

C-8

CITY OF MURRIETA, POLICE DEPARTMENT

28. WRITTEN NOTICE. Any written notice required to be given in any part of the Contract Documents shall be performed by depositing the same in the U.S. Mail, postage prepaid, directed to the address of CONTRACTOR as set forth in the Contract Documents, and to CITY addressed as follows:

Jeremy Durrant
Lieutenant
City of Murrieta Police Department
2 Town Square
Murrieta, CA 92562
IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed on the date first above written.

DATED: 10-17-2024 CONTRACTOR;
By:_
Jesus Mariscal
Print or type NAME
President
Print or type TITLE
(626) 454-4761
Phone Number
By:_
Print or type NAME
Print or type TITLE
Phone Number
DATED: CITY OF MURRIETA
By:_
Kim Summers, City Manager
APPROVED AS TO FORM:

Tiffany Israel, City Attorney
ATTEST:

Cristal McDonald, City Clerk
C-9