Construction Contract Award for:

CIP 8043
–
Clinton Keith Road and Date Street
Pavement Rehabilitation Project
March 19, 2024
City Council Meeting
Agenda Item # 24-489
Received After Agenda Printed
03/19/2024 - Regular Meeting
Item 5 Staff Presentation

Page 2 ends

Department of Public Works/Engineering
Background
 CIP 8043 – Pavement Rehabilitation Improvements
 Limits of work on Clinton Keith Road are from the City/County Boundary line near County Fire Station #75 to Rancho Mirlo Road, and Date Street from Margarita Road to 700’ North/East.  Remove and replace designated failed sections of asphalt.  Install Hot Mix Asphalt (HMA) overlay.
 AC dike improvements, overside drain improvements, miscellaneous concrete work, pavement fabric, signing/striping, correction of deficiencies in roadway, and loop detector replacements.

Page 3 ends

Department of Public Works/Engineering
Limits of Work:
1) Clinton Keith Road from
City/County Border to Rancho
Mirlo Road
2) Date Street from Margarita
Road to 700’ North/East

Page 4 ends

Department of Public Works/Engineering
Funding Sources
 CIP 8043 – Pavement Rehabilitation: Funded by the Road Repair and Accountability Act of 2017 (SB-1), Gas Tax, and Measure A
 Funding is available in CIP 8043

Page 5 ends

Department of Public Works/Engineering
Bid Results
 Bids Opened: February 15, 2024
 Nine (9) bids received:
 Bids ranged from $1,832,612.50 to $2,310,409.14
 Low bid submitted by ONYX Paving Company
Inc. for $1,832,612.50
 Bids found to be consistent with current market
 No Bid Protests Received

Page 6 ends

Department of Public Works/Engineering
Recommendation

1. Award the Construction Contract for the Clinton Keith Road and Date Street Pavement Rehabilitation Project, Capital
Improvement Plan No. 8043 to the lowest responsible bidder, ONYX Paving Company Inc., in the amount of $1,832,612.50 plus fifteen percent (15%) contingency for a total amount of $2,107,504.38.

2. Authorize the City Engineer to approve Contract Change Orders not to exceed fifteen percent (15%) of the Contract amount.

3. Authorize and direct the Mayor to execute the Contract on behalf of the City.