Cities Index.
ATT 8 Trip Generation Analysis

Murrieta City Council
May 20, 2025

Document
ATT 8 Trip Generation Analysis
Meeting
May 20, 2025
Body
Murrieta City Council
Pages
5
Original file
2.9 MB
Text extracted from the city's file for reading and search. Open the original on murrieta.legistar1.com. That file is the official record.

4411 Mercury Street, Suite 207A
San Diego, CA 92111
619-233-9373

Darnell & ASSOCIATES

TRANSPORTATION PLANNING & TRAFFIC ENGINEERING

August 11, 2021

Travis Cochran-Kilman
U-Haul Company of Oceanside
27941 Jefferson Avenue
Temecula, CA. 92590-6605 D&A Project No: 200207

Subject: Traffic Scoping Agreement Trip Generation Analysis and Vehicle Miles Travelled (VMT) Analysis for the proposed 11,608 square foot U- Haul Warehouse Building located at 41458 Los Alamos Road in the City of Murrieta.

APN # 949-220-013.

Dear Mr. Cochran-Kilman:

In accordance with your authorization, we have prepared the att ached Scoping Agreement and compared the Project Trip Generation and Vehicle Miles Travelled to the City of Murrieta’s May 2020 Traffic Study Guidelines to determine if additional is req uired. Figure 1 is a vicinity map showing the location of your project and Figure 2 presents a copy of the proposed project site plan. Your project proposes the development of a 11,608 square foot warehouse building to accommodate the storage of U-Box containers for moving and stor age. (See attached U-Haul data.) The project is proposed to enhance the existing U-Haul operation. The project sites primary access is a single driveway on Los Alamos Road. The pr oposed site is located adjacent to the existing U-Haul site operation. Figure 3 presents the surrounding existing U-Haul site plan.

The first step requires the estim ation of project trip generati on and comparison of project traffic to the City of Murrieta Traffic Impact Analysis Preparation Gui delines. It is my understanding the project is a 24-hour operation with two (2) employees at ea ch of the three (3) shifts. The storage warehouse will accommodate the delivery and pick up of U-Haul Box containers for storage and/or shipping.

Trip Generation

We have estimated project trip ge neration using the Institute o f Transportation Engineers Trip Generation Manual, 10
th Edition. Table 1 summarizes the Trip Generation Rates, Land U se and Density, and Daily, AM and PM pear hour trips generated by the project. Copies of the ITE Trip Generation Rates are presented in Attachment A and include ITE Code 151 for Mini Warehouse for reference.

Review of Table 1 identifies the project will generate 21 daily , 2 AM peak hour trips and 2 PM peak hour trips. Comparison to estimate trips by employee find s the two (2) estimates are similar.

ASPHALT PAVING

ASPHALT PAVING

CONCRETE
CONC.

GRASS
9 SPACES
9 SPACES
BRICK

CONCRETE
4 SPACES
1 SPACE
9 "EXTENDED" SPACES
9 "EXTENDED" SPACES

CONCRETE
"NO PARKING"
"BIKE LANE"
SIGN
"TOWED VEHICLES""CLAIM" SIGN
27'-11"

WATER BACK FLOW

REPEATER
29'-1"

5.0' WROUGHTIRON FENCE
VARIABLE HT.BLOCK WALL
VARIABLE HT.BLOCK WALL
VARIABLE HT.BLOCK WALL
8 "EXTENDED" SPACES
GATE
MOTOR
"NO PARKING"
"BIKE LANE"
SIGN
VARIABLE HT.

CHAIN LINK FENCE

5.0' WROUGHTIRON FENCE ONRET. WALL

5.0' WROUGHTIRON FENCE
"NO PARKING"
"BIKE LANE"
SIGN
"RIGHT LANE"
"MUST TURN"ROAD SIGN
"NO PARKING"
"BIKE LANE"
SIGN

CONCRETE WALK

CONCRETE WALK

CONCRETE WALK

CONCRETE WALK

PARKING SPACES

PARKING SPACES
3 SPACES

CONCRETE PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING
VARIABLE HT.

BLOCK WALL
VARIABLE HT.

BLOCK WALL
VARIABLE HT.

BLOCK WALL
12'-10"
0'-10"
12'-9"
9'-2"
11'-2"
1'-0"
9'-8"
ELEC.

VAULT

DUMPSTER AREA

W/SCREEN WALL

PROPANE TANK
& FILLING STATION

PLANTER

PLANTER

PLANTER

CONCRETE WALK

CONCRETE WALK

PLANTER

PLANTER

CONCRETE WALK

CONCRETE WALK
28'-1"

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

CONCRETE WALK

CONCRETE WALK
TILE

4.0' BLOCK WALL
0'-6"
0'-6"

5.0' WROUGHT

IRON FENCE
0'-7"
0'-2"

DIRT/GRAVEL

DIRT/GRAVEL

DIRT/GRAVEL

DIRT/GRAVEL

DIRT/GRAVEL

DIRT/GRAVEL

PLANTER

DUMPSTER AREA
W/6.0' BLOCKSCREEN WALL

CONCRETE LOADING PLATFORM

GRAVEL PLANTER

GRAVEL PLANTER
CANOPY
35'-9"
9'-6"
9'-11"
34'-8"
38'-6"
40'-0"
0'-6"2'-1"
59'-8"
39'-9"
129'-9"
39'-10"
GRAVEL

CONCRETE
GRAVEL
GRAVEL
GRAVEL

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

CONCRETE WALK

CONCRETE WALK
CONC.

CANOPY
63'-8"
103'-8"
152'-3"
FND. 1" PIPE
W/"LS 3821"CAP
FND. 1" PIPE
W/"LS 3821"
CAP
FND. 1" PIPE
W/"LS 3821"CAP
(TO BE SET)
SET 1/2" I.P.

W/"LS 8541" CAP
SET 1/2" I.P.

W/"LS 8541" CAP
SET 1/2" I.P.

W/"LS 8541" CAP
SET 1/2" I.P.

W/"LS 8541" CAP
FND. 2" PIPE
W/"LS 6896" TAG
FND. 2" PIPE
W/"LS 6896" TAG
(O/S: 5.0')
FND. 3" BRASS CAP
IN CITY MON. WELL
(IN LIEU OF 1" I.P.)
(W/"LS 3698" TAG")
(PER PM 25/82)
55'-0"
S 42°07'40" E
199.00'
S 47°47'54" W
136.95'
S 47°47'54" W
105.00'
N 42°07'40" W
199.00'
N 47°47'54" E
241.75'
S 42°11'03" E
199.00'
105.00'
136.75'
PARCEL 4
(P.M. NO. 7654)
(TITLE PARCEL 3)
PARCEL 3
(P.M. NO. 7654)
PARCEL B-(P.M. NO. 7654)
PARCEL 2(P.M. NO. 7654)
PARCEL 1(P.M. NO. 7654)
50'-0"
N 47°47'54" E
180.00'
PARCEL A-(P.M. NO. 7654)
P.O.C.

AS-SURVEYED DESCRIPTION
& TITLE DESCRIPTION
(265' - R)
(SOUTHEASTERLY -R)
S 42°07'40" E
254.00'
(SOUTHEASTERLY -R)
(250' - R)
S 47°47'54" W
573.25'
(NORTHWESTERLY - R)
(BASIS OF BEARINGS)
(630' - R)
S 42°13'33" E
261.00'
(NORTHWESTERLY - R)
(250' - R)
(SOUTHWESTERLY - R)
(630' - R)
P.O.B.

PARCEL 1

TITLE DESCRIPTION
(SOUTHWESTERLY - R)
PARCEL 1
(PORTION OF LOT 91)
P.O.B.

PARCEL 2

TITLE DESCRIPTION
N 47°47'54" E

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING
(S 47°45' W - R)
(690' - R)
(254' - R)
(630' - R)
(S 47°45' W - R)
N 47°47'54" E
156.50'
(11'-R)
(N 47°45' E - R)
(11'-R)
PARCEL 2
N 42°08'30" W

6.60'
N 42°08'30" W

35.85'
159.40'
R:788.00'
L:108.00'
D:7°51'06"
ChD:107.90'
ChB:N 38°12'57" W
R:812.00'
L:111.25'
D:7°51'06"
ChD:111.20'
ChB:N 38°12'57" W
N 47°47'54" E

70.60'
P.O.B.

AS-SURVEYEDDESCRIPTION
5 SPACES
APN: 949-220-047

ROY PAUL PHILLIPS
APN: 949-220-031
JAMES L. HUNTER
APN: 949-220-032
JAMES L. HUNTER
APN: 949-220-072

MURRIETA SPECTRUM
APN: 949-224-021
SUDWEEKS DEV.

EXISTING U-HAUL

NOT IN CONSTRUCTION
N.I.C.

EXISTING BUILDING 'A'

NOT A PART

NOT A PART
20' STREET SETBACK
10' SIDE YARD SETBACK
10' SIDE YARD SETBACK

EXTGACCESS
PROP'D
TREE, TYP.

PROP'D
TREE, TYP.

PROP'D
TREE, TYP.
27'-10"

PROP'D WALKWAY
11 CONCRETE

LOADING DOCK

EXTG BUILDING 'A'

TWO STORY
24,495 S.F. FOOTPRINT
40,182 GFA W/OUT PH 2

COVERED DOCK
FF=1105.33
FF=1105.33

REUSEAREA
COMM.RM
ADA
UNISEX
FIRE
RISER
EXTG
12'x10' OHD
EXTG
DOOR
PROP'D

BUILDING 'B'
U-Haul of Murrieta, CA
25086 Jefferson Ave
Murrieta, CA 92562
Proposed
Site Plan
732035
BDC
NH
03/01/2019 SP1
SITE AERIAL SCALE: N.T.S.

PROPOSED SITE PLAN SITE DATASCALE: 1" = 40' - 0"

ZONING INFORMATION
PROJECT NAME: U-Haul of Murrieta, Abutting 732035
MUNICIPALITY: City of Murrieta
PROJECT ADDRESS: 25086 Jefferson Ave, Murrieta, CA 92562 APN /ACRE / AREA: .4797 acres & .6518 acres
ZONE: CC - Community Commercial
ADJACENT ZONING:

N: CC - Community Commercial
E: CC - Community Commercial
S: MF-3 - Residential
W: MF-3 / CC - Residential / Community Commercial
PERMITTED USES: Retail
Self-Storage facilities - CUP
Automobile & Truck Rental - CUP
SETBACKS:

FRONT YARD / STREET: 20 ft. per overlay
SIDE YARD / INTERIOR: 0 ft. or 10 ft. to commercial
HEIGHT LIMIT: 50 ft.

OPEN SPACE: 0%
MAX IMPERVIOUS: 0%
PARKING:

Retail = 1 sp./ 200 sf of GFA, plus 1 sp/ 1,000 sf of outdoor display
Self-Storage = 1 sp./ 1,000 sf. GFA for first 20,000 sf, then 1 sp./ 2,000 sf. GFA = 11 spaces req'd/ 11 spaces provided LANDSCAPE:
20% minimum on-site landscaping
One tree per 30 linear ft. of structure. Other areas, one tree for each 300 sq. ft. of landscape area. Clustering of trees is encouraged.
890 ft. of structure = 30 trees min. required / provided

PROJECT SITE
FIGURE 2 - PROPOSED PROJECT

SITE PLAN

ASPHALT PAVING

ASPHALT PAVING

CONCRETE
CONC.

GRASS
9 SPACES
9 SPACES
BRICK

CONCRETE
4 SPACES
1 SPACE
9 "EXTENDED" SPACES
9 "EXTENDED" SPACES

CONCRETE
"NO PARKING"
"BIKE LANE"
SIGN
"TOWED VEHICLES""CLAIM" SIGN
27'-11"

WATER BACK FLOW

REPEATER
29'-1"

5.0' WROUGHTIRON FENCE
VARIABLE HT.BLOCK WALL
VARIABLE HT.BLOCK WALL
VARIABLE HT.BLOCK WALL
8 "EXTENDED" SPACES
GATE
MOTOR
"NO PARKING"
"BIKE LANE"
SIGN
VARIABLE HT.

CHAIN LINK FENCE

5.0' WROUGHTIRON FENCE ONRET. WALL

5.0' WROUGHTIRON FENCE
"NO PARKING"
"BIKE LANE"
SIGN
"RIGHT LANE"
"MUST TURN"ROAD SIGN
"NO PARKING"
"BIKE LANE"
SIGN

CONCRETE WALK

CONCRETE WALK

CONCRETE WALK

CONCRETE WALK

PARKING SPACES

PARKING SPACES
3 SPACES

CONCRETE PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING
VARIABLE HT.

BLOCK WALL
VARIABLE HT.

BLOCK WALL
VARIABLE HT.

BLOCK WALL
12'-10"
0'-10"
12'-9"
9'-2"
11'-2"
1'-0"
9'-8"
ELEC.

VAULT

DUMPSTER AREA

W/SCREEN WALL

PROPANE TANK
& FILLING STATION

PLANTER

PLANTER

PLANTER

CONCRETE WALK

CONCRETE WALK

PLANTER

PLANTER

CONCRETE WALK

CONCRETE WALK
28'-1"

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

CONCRETE WALK

CONCRETE WALK
TILE

4.0' BLOCK WALL
0'-6"
0'-6"

5.0' WROUGHT

IRON FENCE
0'-7"
0'-2"

DIRT/GRAVEL

DIRT/GRAVEL

DIRT/GRAVEL

DIRT/GRAVEL

DIRT/GRAVEL

DIRT/GRAVEL

PLANTER

DUMPSTER AREA
W/6.0' BLOCKSCREEN WALL

CONCRETE LOADING PLATFORM

GRAVEL PLANTER

GRAVEL PLANTER
CANOPY
35'-9"
9'-6"
9'-11"
34'-8"
38'-6"
40'-0"
0'-6"2'-1"
59'-8"
39'-9"
129'-9"
39'-10"
GRAVEL

CONCRETE
GRAVEL
GRAVEL
GRAVEL

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

CONCRETE WALK

CONCRETE WALK
CONC.

CANOPY
63'-8"
103'-8"
152'-3"
FND. 1" PIPE
W/"LS 3821"CAP
FND. 1" PIPE
W/"LS 3821"
CAP
FND. 1" PIPE
W/"LS 3821"CAP
(TO BE SET)
SET 1/2" I.P.

W/"LS 8541" CAP
SET 1/2" I.P.

W/"LS 8541" CAP
SET 1/2" I.P.

W/"LS 8541" CAP
SET 1/2" I.P.

W/"LS 8541" CAP
FND. 2" PIPE
W/"LS 6896" TAG
FND. 2" PIPE
W/"LS 6896" TAG
(O/S: 5.0')
FND. 3" BRASS CAP
IN CITY MON. WELL
(IN LIEU OF 1" I.P.)
(W/"LS 3698" TAG")
(PER PM 25/82)
55'-0"
S 42°07'40" E
199.00'
S 47°47'54" W
136.95'
S 47°47'54" W
105.00'
N 42°07'40" W
199.00'
N 47°47'54" E
241.75'
S 42°11'03" E
199.00'
105.00'
136.75'
PARCEL 4
(P.M. NO. 7654)
(TITLE PARCEL 3)
PARCEL 3
(P.M. NO. 7654)
PARCEL B-(P.M. NO. 7654)
PARCEL 2(P.M. NO. 7654)
PARCEL 1(P.M. NO. 7654)
50'-0"
N 47°47'54" E
180.00'
PARCEL A-(P.M. NO. 7654)
P.O.C.

AS-SURVEYED DESCRIPTION
& TITLE DESCRIPTION
(265' - R)
(SOUTHEASTERLY -R)
S 42°07'40" E
254.00'
(SOUTHEASTERLY -R)
(250' - R)
S 47°47'54" W
573.25'
(NORTHWESTERLY - R)
(BASIS OF BEARINGS)
(630' - R)
S 42°13'33" E
261.00'
(NORTHWESTERLY - R)
(250' - R)
(SOUTHWESTERLY - R)
(630' - R)
P.O.B.

PARCEL 1

TITLE DESCRIPTION
(SOUTHWESTERLY - R)
PARCEL 1
(PORTION OF LOT 91)
P.O.B.

PARCEL 2

TITLE DESCRIPTION
N 47°47'54" E

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING

ASPHALT PAVING
(S 47°45' W - R)
(690' - R)
(254' - R)
(630' - R)
(S 47°45' W - R)
N 47°47'54" E
156.50'
(11'-R)
(N 47°45' E - R)
(11'-R)
PARCEL 2
N 42°08'30" W

6.60'
N 42°08'30" W

35.85'
159.40'
R:788.00'
L:108.00'
D:7°51'06"
ChD:107.90'
ChB:N 38°12'57" W
R:812.00'
L:111.25'
D:7°51'06"
ChD:111.20'
ChB:N 38°12'57" W
N 47°47'54" E

70.60'
P.O.B.

AS-SURVEYEDDESCRIPTION
5 SPACES
APN: 949-220-047

ROY PAUL PHILLIPS
APN: 949-220-031
JAMES L. HUNTER
APN: 949-220-032
JAMES L. HUNTER
APN: 949-220-072

MURRIETA SPECTRUM
APN: 949-224-021
SUDWEEKS DEV.

EXISTING U-HAUL

NOT IN CONSTRUCTION
N.I.C.

EXISTING BUILDING 'A'

NOT A PART

NOT A PART
20' STREET SETBACK
10' SIDE YARD SETBACK
10' SIDE YARD SETBACK

EXTGACCESS
PROP'D
TREE, TYP.

PROP'D
TREE, TYP.

PROP'D
TREE, TYP.
27'-10"

PROP'D WALKWAY
11 CONCRETE

LOADING DOCK

EXTG BUILDING 'A'

TWO STORY
24,495 S.F. FOOTPRINT
40,182 GFA W/OUT PH 2

COVERED DOCK
FF=1105.33
FF=1105.33

REUSEAREA
COMM.RM
ADA
UNISEX
FIRE
RISER
EXTG
12'x10' OHD
EXTG
DOOR
PROP'D

BUILDING 'B'
U-Haul of Murrieta, CA
25086 Jefferson Ave
Murrieta, CA 92562
Proposed
Site Plan
732035
BDC
NH
03/01/2019 SP1
SITE AERIAL SCALE: N.T.S.

PROPOSED SITE PLAN SITE DATASCALE: 1" = 40' - 0"

ZONING INFORMATION
PROJECT NAME: U-Haul of Murrieta, Abutting 732035
MUNICIPALITY: City of Murrieta
PROJECT ADDRESS: 25086 Jefferson Ave, Murrieta, CA 92562 APN /ACRE / AREA: .4797 acres & .6518 acres
ZONE: CC - Community Commercial
ADJACENT ZONING:

N: CC - Community Commercial
E: CC - Community Commercial
S: MF-3 - Residential
W: MF-3 / CC - Residential / Community Commercial
PERMITTED USES: Retail
Self-Storage facilities - CUP
Automobile & Truck Rental - CUP
SETBACKS:

FRONT YARD / STREET: 20 ft. per overlay
SIDE YARD / INTERIOR: 0 ft. or 10 ft. to commercial
HEIGHT LIMIT: 50 ft.

OPEN SPACE: 0%
MAX IMPERVIOUS: 0%
PARKING:

Retail = 1 sp./ 200 sf of GFA, plus 1 sp/ 1,000 sf of outdoor display
Self-Storage = 1 sp./ 1,000 sf. GFA for first 20,000 sf, then 1 sp./ 2,000 sf. GFA = 11 spaces req'd/ 11 spaces provided LANDSCAPE:
20% minimum on-site landscaping
One tree per 30 linear ft. of structure. Other areas, one tree for each 300 sq. ft. of landscape area. Clustering of trees is encouraged.
890 ft. of structure = 30 trees min. required / provided

PROJECT SITE

SURROUNDING EXISTING

U-HAUL SITE PLAN
FIGURE 3
Travis Cochran-Kilman
U-Haul Company of Oceanside
August 11, 2021

Page 5 ends

To further support the project trip generation, we evaluated th e project pickup and delivery of U- Haul containers to present a worst daily impact. The two (2) e mployees trip generation at the project site for three (3) shifts over the 24-hour operation wi ll generate twelve (12) vehicle trips (2 employees x 3 shifts x 2 trips each = 12 vehicle trips). This is less than the ITE Trip Rates.

The next step in the analysis process, we compared the trip gen eration of the project to the Transportation Impact requirements in Section 2.0 of the City o f Murrieta Traffic Impact Analysis Preparation Guide. A copy is included in Attachment A to this Letter. Review of the Section 2.0 states any project wh ich can demonstrate that it ge nerates less than 100 peak hour trips and does not require a Traffic Impact Analysis (TIA) that includes Level of Service (LOS) Analysis.

We then compared the project trip generation to the City of Mur rieta Traffic Study Guidelines and to determine if additional traffic analysis and/or vehicle Miles Travelled (VMT) analysis is required.

Traffic Impact Analysis

The City of Murrieta Traffic Impact Analysis Preparation Guidel ines identify that the need for additional traffic analysis is not required for projects that generate less than 100 peak hour trips.

Comparison of the Table 1 - Project Trip Generation to t he 100 peak hour threshold, find s the proposed projects 2 AM and 2 PM Peak Hour Trips are each less t han the 100 peak hour thresholds. Therefore no additional Traffic Impact Analysis (TIA) is required.

Vehicle Miles Travelled (VMT)

The next step in the analysis pr ocess, we reviewed the proposed 11,608 square foot warehouse project to the City of Murrieta VMT analysis requirements. Rev iew of the City of Murrieta Table 1 – Trip Generation Rates and Calculations Summary Trip Generation Rates
Land Use ITE
Code Daily AM Peak Hour PM Peak Hour
Rate In: Out Ratio Rate In: Out Ratio
Warehouse 150 1.74 Trips/ KSF 0.17/KSF 77:23 0.19/KSF 27:73 Trip Generation Calculations
Land Use ITE
Code Density ADT AM Peak Hour PM Peak Hour
In Out Total In Out Total
Warehouse 150 11,608 S.F. 21 1 1 2 1 1 2
Total: 21 1 1 2 1 1 2
Note: KSF= 1,000 square feet,
The trip rates for the project’s land uses are based on the Institute of Transportation Engineers (ITE)s Trip Generation Manual 10th Edition Publication
August 11, 2021

Attachment A

• Scoping Agreement

Attachment B

• Excerpts from City of Murrieta Traffic Impact Analysis Preparation Guidelines

• ITE Code 150 Mini Warehouse Trip Generation Rates

• ITE Code 151 Warehouse Trip Generation Rates

• U-Haul U-Box Containers for Moving & Storage Information

← All documents from this meeting