CITY OF MURRIETA, DEPARTMENT OF PUBLIC WORKS
***The entirety of this Proposal Section shall be completed, scanned, and submitted online with the electronic proposal in the PlanetBids Vendor Portal as identified in the Instructions to Bidders. The original, hardcopy of this proposal shall be submitted to the City Project Manager
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CITY PROJECT NO. 10-340
CIP No. 8079
DATE: 4|17/25
TO THE CITY CLERK OF MURRIETA, CALIFORNIA:
BIDDER (Firm Name) Rove Engineering, Inc.
The undersigned hereby proposes and agrees to furnish any and all materials, labor, and services for the following:
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CITY PROJECT NO. 10-340
CIP No. 8079
All in accordance with the City's Notice Inviting Bids, hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above-stated project as set forth in the Plans, Specifications, and Contract Documents therefore, and to perform all work in the manner and time prescribed therein. The attached Bid Schedule is hereby made a part of this proposal.
The undersigned bidder declares that this proposal is based upon careful examination of the work site, Plans, Specifications, Instructions to Bidders, and all other Contract Documents. If this proposal is accepted for award, bidder agrees to enter into a contract with City at the unit prices or lump-sum prices set forth in the following Bid Schedule. Bidder understands that failure to enter into a contract and furnish bonds in the manner and time prescribed will result in forfeiture to City of the guarantee accompanying this proposal.
The undersigned bidder certifies that this proposal is made in good faith, without collusion or connection with any other person or persons bidding on the work.
The undersigned bidder understands that the City Council reserves the right to accept or reject any or all proposals, or to waive any irregularities in any proposal in the interests of City.
The estimated quantities listed in the Proposal Bid Sheets) are supplied to give an indication of the general scope of work, but the accuracy of these figures is not guaranteed and bidder shall make his own estimates from the drawings. In case of a variation between the unit price and the totals shown by bidder, the unit price will be considered to be the bid
PROPOSAL P-1
CITY OF MURRIETA, DEPARTMENT OF PUBLIC WORKS
BID SHEET
***This Bid Sheet defines how the project will be bid and what will constitute the Lowest Bidder.
The actual unit prices and total item prices shall be submitted online on the PlanetBids Vendor Portal as defined in the Instructions to Bidders. Should there be a discrepancy between this Bid Sheet and the electronic proposal, the electronic proposal shall govern.***
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CITY PROJECT NO. 10-340
CIP No. 8079
ITEM ESTIMATED UNIT TOTAL ITEM
NO. DESCRIPTION QUANTITY UNIT PRICE PRICE
BASE BID - GENERAL
1 Mobilization and Demoblization 1 LS
2 Clearing and Grubbing (Includes demolition items not listed) 1 LS 3 Traffic Control and Construction Staging 1 LS
4 Construction Staking 1 LS
5 Changeable Message Signs EA UNIT PRICES and
TOTAL ITEM
Project Information Signs 2 EA PRICES shall be
Survey Monument Placement & Preservation (Includes submitted Map Recordation) 16 EA online at
Storm Water Pollution Control and Erosion Control PlanetBids.com 8 (Includes SWPPP Development & Implementation and Soil Stabilization) 1 LS
9 Utility Coordination 1 LS
10 Potholing 1 LS
11 Record Drawing ("As-Built") Plans 1 LS
BASE BID - ADJUSTMENTS
12 Adjust existing Gas Handhole to finish grade 1 EA
13 Adjust existing Telephone Manhole to finish grade 6 EA 14 Adiust existing Sewer Manhole to finish grade 3 EA
15 Adjust existing Storm Drain Manhole to finish grade 1 EA 16 Adjust existing Water Meter to finish grade 1 EA
17 Adjust existing traffic signal pull box to finish grade 2 EA 18 Double adjust existing sewer Manhole 4 EA
19 Double adjust Existing Storm drain Manhole 4
20 Double adjust Telephone Manhole 1 EA
BASE BID - SURFACE IMPROVEMENTS
21 Cold Milling Asphalt Concrete Pavement (2 3/8" Depth) 453768 SF Remove and Dispose of Asphalt Concrete Pavement (AC
22 Digout Average Depth 7") 52352 SE
Asphalt Concrete Pavement for Removal and Replacement
23 (Digouts) 2198 TON
24 Install 3/8" ARAM 50418 SY
25 2" Asphalt Concrete (AC) Overlay 5450 TON
26 3" Asphalt Pavement (AC) 437 TON
27 4" Asphalt Concrete (AC) 96 TON
28 5" Asphalt Concrete (AC) 2295 TON
PROPOSAL P-2
CITY OF MURRIETA, DEPARTMENT OF PUBLIC WORKS
ITEM ESTIMATED UNIT TOTAL ITEM
NO. DESCRIPTION QUANTITY UNIT PRICE| PRICE
29 6" Class I| Aggregate Base (AB) 399 CY
30 12" Class Il Aggregate Base (AB) 148 CY
31 16" Class II Aggregate Base (AB) 3778 CY
32 Construct 6" Type A-6 Curb and Gutter per COM 301 6758 LE Construct 6" Type A-6 Curb and Gutter per COM 301
33 w/Deepened Footing (Detail B, Sheet 17) 1125
34 Construct 8" Type A-8 Curb and Gutter per COM 302 30 35 Construct 8" Type D Curb per COM 305 (Case A) 5639
36 Construct 4" PCC Median Curb Depression 240
37 Construct PCC Sidewalk per COM 320 39500
38 Construct PCC Driveway Approach per COM 310a 1875
39 Construct PCC Access Ramp per COM 321a/321b 4
40 Construct PCC Access Ramp per SPPWC 111-5 (Type 1,
Case B) 2
41 Construct PCC Spandrel per COM 311 2782
42 Construct PCC Cross Gutter per COM 312 1301
43 Construct Pier and Lagging Retaining Walls 32710
44 Construct Planter Walls 1300
45 Construct Sound Walls 1025
46 Sawcut, Remove and Dispose Existing Asphalt 45110
47 Remove and Dispose Existing Pavers 850
48 Remove and Dispose Existing Curb 267
49 Remove and Dispose Existing Curb and Gutter 7882
Remove and Dispose Existing Sidewalk or PCC Driveway
50 Approach 4380 SE
51 Remove and Dispose Existing Cross Gutter and
Spandrel(s) 6570 SE
Remove and Dispose Existing Concrete Channel (Sheet
52 12) 1500 SF
53 Remove and Dispose Existing Concrete 650
54 Remove and Dispose Existing Catch Basin EA
Remove and Dispose Existing Stucco Walls (Golf Course
55 Maintenance Yard) 310 LE
Remove and Reconstruct Tubular Steel Fence with Pillars 56 in kind (N/W corner of Via Princesa) 1 LS
57 Relocate Existing B'Nai Chaim Monument (Sheet 12) 1 LS Relocate Community Mailbox and Construct new PCC pad
58 (Ridgegate Community) 1 LS
Relocate Street Name Sign W/ Wooden Post (Ridgegate
59 Community 1 EA
60 Relocate Existing Parking Blocks EA
61 Relocate and Reconstruct Fence to Proposed R/W 1700 LF 62 Relocate and Reconstruct Existing Chainlink Gate and Posts (Golf Course Yard) 1 LS
63 Remove and Replace 8' Stucco Screen Wall 40 LE
64 Construct 24" Concrete V-Ditch (Sheet 13) 45 LE
65 Construct Diamond Plate Curb Cover per COM 602 5 EA
PROPOSAL P-3
CITY OF MURRIETA, DEPARTMENT OF PUBLIC WORKS
ITEM ESTIMATED UNIT TOTAL ITEM
NO. DESCRIPTION QUANTITY UNIT PRICE| PRICE
66 Construct Bus Turnout per COM 217 3 EA
67 Construct 24" wide PCC ditch 1375 LF
68 Construct Custom J-Ditch (Detail 43, Sheet 2) 15 475 LE 69 Construct Combo Screen/Retaining Wall 270 LF
70 Construct COM Retaining Wall Type 1:6" Toe 110 LE
71 Construct CL-6 Fence per Caltrans A85, A85A 240 LE
72 Construct 6' high tubular steel fence 480 LE
73 Construct 42" Guard Rail Fence 1085 LF
74 Construct 6 wide PCC cross gutter per COM 312 150 SE Construct Parkway Culvert Type C (Case | Inlet) per COM 75 409C 1 EA
76 Construct Parkway Culvert Type C (Case I! Inlet) per COM 409C 2 EA
77 Construct Gutter Depression per COM 425A (Case B) 1
78 Construct Gutter Depression per COM 424 (Case A) 2
BASE BID - ELECTRICAL
79 Install LED Street Light per COM 620/620C (draft) EA 80 Install Wall Mountable Street Light (Ridgegate Community) EA Install Light Timer, sensor and Equipment in new SS
81 Cabinet w/PCC Foundation
Reconfigure Lighting as needed (Ridgegate Community) 1 LS
BASE BID - DRAINAGE
82 Construct Curb Inlet Catch Basin per COM 401/402 1 EA Construct Combination Curb Inlet Catch Basin No. 2 per
83 COM 404/405 2 EA
84 Modify Ex Grated Inlet to Serve as Junction Structure (Sheet 2) 2 EA
85 Construct 10' Wide Concrete Overflow Drain 140 LE
Install Bio-Clean Capture Inlet 36-36-24 with Trough
86 System (Curb Inlets) 3 EA
Construct Parkway Dispersion Area (Per Details Sheets 16 87 & 17) 1125 LE
Construct Dispersion Area check dam and Splash Pad
88 18
(Detail E, Sheet 17) EA
89 Construct Curb Opening, Gutter Depression and Splash Pad for Dispersion Area (Details C & D, Sheet 17) 25 EA Install 12"x12" Grated Inlet (Brooks CB1212 or approved 90 5
equal) Retaining Wall Drainage EA
91 Install 24" RCP Storm Drain Pipe (Sheet 2) 11
92 Install 8" PVC Pipe (Retaining Wall Drainage) 925
BASE BID - EARTHWORK
93 Unclassified Excavation 13750 CY
94 Unclassified Excavation - Removal and Recompaction 9560 CY IrT 95 Unclassified Fill 1890 CY
BASE BID - TRAFFIC SIGNAL AND SIGNING AND
STRIPING
96 Wet Sandblast paint striping 800 LE
PROPOSAL P-4
CITY OF MURRIETA, DEPARTMENT OF PUBLIC WORKS
ITEM ESTIMATED UNIT TOTAL ITEM
NO. DESCRIPTION QUANTITY UNIT PRICE PRICE
97 Removal of Thermoplastic Markings 45 SE
98 Paint Pavement Striping - Parking (4" Solid White Stripe) 325 LE 99 Paint Pavement Striping (6" Solid White Stripe) 1650 LE 100 Paint Pavement Striping (Detail 12) 18865 LE
101 Paint Pavement Striping (Detail 22) 1175
102 Paint Pavement Striping (Detail 25) 6370
103 Paint Pavement Striping (Detail 29) 1350
104 Paint Pavement Striping (Detail 32) 10
105 Paint Pavement Striping (Detail 38) 3350
106 Paint Pavement Striping (Detail 39) 7850
107 Paint Pavement Striping (Detail 39A) 1500
108 Paint Green Methyl Metacrylate Bike Lane 2000
109 Paint Bike Symbol with Person and Bike Symbol Arrow 147 110 Paint Curb Red 1000
111 Paint Median Nose Yellow
Thermoplastic Pavement Striping (12"W - Crosswalk / Stop 112
Limit Line) 2080 SF
Thermoplastic Pavement Marking (Type IV Arrow (LT &
113
RT)) 375
114 Thermoplastic Pavement Marking "SIGNAL." & 'AHEAD" 1890 SE 115 Relocate Existing Roadside Sign 10 EA
116 Install Roadside Sign 21 EA
117 MHSR/Via Princesa Traffic Signal 1 LS
118 MHSR/Calle Del Lago Traffic Signal 1 LS
119 Fiber Optic System 1 LS
120 Relocate Ped Push Button Post/Button at Date Street 1 EA 121 Detector Loop Replacement 50 EA
BASE BID - LANDSCAPE AND IRRIGATION
122 Install 4"x8" Concrete Pavers in Raised Median 14595 123 6" Concrete Header 800
124 Stabilized Decomposed Granite
125 Vine Grate
126 Class A Topsoil Import for Median Planting Areas
127 Landscape Planting (Public Right-of-Way)
128 Irrigation System (Public Right-of-Way)
129 Install Water Meter (Per Water Meter Plans - Appendix E, D-71584) 2 EA
130 90 Day Maintenance and Plant Establishment 1 LS
131 Install Pavers (Ridgegate Community) 925 SE
Relocate Irrigation Timer and Equipment and install into 132 new SS Cabinet w/ PCC foundation
Reconfiqure Irrigation System (Ridgegate Community) 1 LS 133 Landscape Planting and Restoration (Ridgegate
Community) 1 LS
BASE BID - VIA FRONTERA WATER
PROPOSAL P-5
CITY OF MURRIETA, DEPARTMENT OF PUBLIC WORKS
ITEM ESTIMATED UNIT TOTAL ITEM
NO. DESCRIPTION QUANTITY UNIT PRICE PRICE
134 Furnish and Install 8" PVC per Via Frontera Water
Improvement Plan (Appendix E, D-61961 through D-61963) 1 LS 135 Remove and Dispose Existing 8" ACP Water Line 420
136 Relocate Existing Water Meters and Reconnect per EMWD STD. B-590A EA
137 Adjust Sewer Manholes to Grade per EMWD STD. SB-8,
SB-53 and SB-61 3 EA
Reconnect Existing 1" Water Service per EMWD STD. B-
138
590A 8 EA
139 Relocate Existing 1" Air Valve per EMWD STD. B-598 1 EA 140 Relocate Existing 6" Fire Hydrant per EMWD STD. B-362 1 EA
BASE BID - UTILITIES
141 SCE Facilities 1 LS
142 Frontier Facilities 1 LS
TOTAL BASE BID: $14,913,956.55
Fourteen million nine hundred thirteen thousand
TOTAL AMOUNT OF BASE BID (WORDS): nine hundred fifty-six and fifty five cents
ADDITIVE BID ITEMS
143 Double adjust water valve cans 19 EA
144 Double adjust existing Sewer Manholes 16 EA
145 Relocate Existing Air Release Valve/Air Vac 3 EA
146 Relocate Existing CP Test Station 1 EA
147 Relocate Existing Blow off Valve 1 EA
Relocate 1" Water Service, 5/8" Meter into sidewalk, and 148
relocate Existing Backflow to Private Property EA
149 Relocate Ex Locator Wire Box into Proposed Sidewalk 1 EA TOTAL ADDITIVE BID: $ 322,043.45
TOTAL AMOUNT OF ADDITIVE BID (WORDS):
Three hundred twenty two thousand forty three dollars
SUM OF THE TOTAL BASE BID ITEMS AND ADDITIVE BID ITEMS: and with, forty $ 15,236,000.00 five cents
SUM OF THE TOTAL BASE BID ITEMS AND ADDITIVE BID ITEMS (WORDS:
fifteen million two hundred thirty six thousand and cents PROPOSAL P-6
CITY OF MURRIETA, DEPARTMENT OF PUBLIC WORKS
ITEM ESTIMATED UNIT TOTAL ITEM
NO. DESCRIPTION QUANTITY | UNIT | PRICE | PRICE
Basis of the bid shall be based upon the sum of the Total Base Bid Items and the Additive Bid Item.
The City reserves the right to reject any or all bids.
The City reserves the right to choose or reject any of the Additive Bid Items.
The unit price or lump sum prices to be paid for the items listed in the Proposal Bid Sheet shall include full compensation r furnishing all labor, materials, tools, and equipment, and doing all work involved in furnishing and installing the materia mplete and in place, in accordance with the details as shown on the plans and as specified herein. Any items shown ( the plans, but not included in the bid items, shall be considered as appurtenant items. All costs shall be included within the appropriate item of the Contractor's bid.
PROPOSAL P-7
CITY OF MURRIETA, DEPARTMENT OF PUBLIC WORKS
BID SCHEDULE
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CITY PROJECT NO. 10-340
CIP No. 8079
Addendum(a) No(s). 1,2,3,4 & 5 has/have been received and is/are included in this proposal.
REJECTION OF BIDS
The undersigned agrees that City reserves the right to reject any or all bids, and reserves the right to waive informalities in a bid or bids not affected by law, if to do so seems to best serve the public interest.
TIME
The Contract and Proposal documents shall be signed by the bidder, scanned, and submitted with the electronic proposal. Two wet-signed copies of the Contract, Proposal documents, Bid Bond, and insurance certificates shall be provided to the City Project Manager within three (3) days of the bid opening. Signatures shall comply with Section 17 of the Contract. The successful bidder shall submit the Contract bonds, within ten (10) calendar days after the bidder has received a Notice of Award
BID DEPOSIT
There is enclosed herewith, a certified check or surety bond in the sum of ten percent (10%) of the base Fifteen million two hundred thirty six thousand dollars and zero cents ($15,236,000. _ made payable to City and the undersigned agrees that in case of his failure to execute the necessary Contract and furnish the required bonds, the certified check or surety bond, the money payable thereon, shall be and remain the property of City.
The undersigned hereby certifies that he will have an appropriate license, issued by the State of California to provide this work; that such license will be in full force and effect throughout the duration of construction; and that any and all subcontractors to be employed on this project will be similarly licensed Dated: 4/17/2025 CONTRACPOR
1046101 Exp. 10/31/2026
California Contractor's License No. Signature
Steven Eugenio - President
Print or Type Name and Title
760-425-0001
Telephone Number
PROPOSAL P-8
CITY OF MURRIETA, DEPARTMENT OF PUBLIC WORKS
SUBCONTRACTORS LIST
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CITY PROJECT NO. 10-340
CIP No. 8079
As required by California State Law, the General Contractor bidding will hereinafter state the subcontractor who will be the subcontractor on the job for each particular trade or subdivision of the work in an amount in excess of one-half of one percent (0.5%) of the General Contractor's total bid and will state the firm name and California contractor license number. If a General Contractor fails to specify a subcontractor, or if he specifies more than one (1) subcontractor for the same portion of work to be performed under the Contract in excess of one-half of one percent (0.5%), he agrees that he is fully qualified to perform that portion himself and that he shall perform that portion himself.
NOTE: If alternate bids are called for, and the General Contractor intends to use different or additional subcontractors on the alternates, he must provide a separate list of subcontractors for each alternate.
***The Subcontractor List shall be provided with the online electronic proposal on the PlanetBids Vendor Portal as defined in the Instructions to Bidders. The signature below indicates the Subcontractor's List presented online is in compliance with the instructions herein.*** PROPOSAL P-9
CITY OF MURRIETA, DEPARTMENT OF PUBLIC WORKS
STATEMENT OF TECHNICAL ABILITY AND EXPERIENCE
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CITY PROJECT NO. 10-340
CIP No. 8079
The bidder is required to state what work of a similar character to that included in the proposed Contract he has successfully performed, especially for public agencies, and give references that will enable City to judge his responsibility, experience, skill, and business and financial standing. Detail any involvement, past or current, relative to litigation or other disputes, if any, concerning your performance.
Cal Trans - Hwy 78 Sinkhole Oceanside Carlos Lopez (619)991-0827 Repair storm drain failure 40' below freeway surface. Shoring, excavation, tie back stabilization, pressure grouting, repaving of freeway and concrete work.
City of El Cajon - Emergency Sewerline Replacement Yasmin Arellano (619) 441-1785 Demo of existing utilities, jack and bore new sewer line under Hwy 8. Drill and pressure grout voids on the freeway, repave and restripping.
Carroll Canyon Retaining Wall Carlos Lopez (619) 991-0827 330 tiebacks, concrete reinforcement, new storm drain, sidewalk, curb & gutter and re-paving of Carroll Canyon Road
We do not have any involvement, past or present, with any disputes concerning our performance. We can provide more detailed work history and financial standings upon request. 113=
Signature of Bidder
PROPOSAL P-10
CITY OF MURRIETA, DEPARTMENT OF PUBLIC WORKS
BIDDER'S STATEMENT OF
PAST CONTRACT DISQUALIFICATIONS
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CITY PROJECT NO. 10-340
CIP No. 8079
The bidder is required to state any and all instances of being disqualified, removed, or otherwise prevented from bidding on or completing any contract for construction.
Have you ever been disqualified from any contract?
Yes No
If yes, explain the circumstances:
PROPOSAL P-11
CITY OF MURRIETA, DEPARTMENT OF PUBLIC WORKS
NON-COLLUSION AFFIDAVIT
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CITY PROJECT NO. 10-340
CIP No. 8079
State of California
County of SAN DIE 60
The undersigned declares:
I am the PRESIDENT of ROVE ENGINEERING, INC.
Forgoing, bid. Thi bi, or ant made in the intertion. ore lid is fer any andisol solpers or same hip. company, association, organization, or corporation.
bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder.
All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged the information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed 03/3t/20a5, at sir Diria CALIFORNIA wat City
State
SiMoni
Notary Public
Date: 03/37/2015
L. MONARI
COMM. 42414378<
NOTARY PUBLIC-CALIFORNIA C
ww Commission -yoired
SEPTEMBER 282020
NOTHiN FORM
PROPOSAL P-12
California Acknowledgement Form
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California
County of SAN Ditto
on 0318718025 before me, L.Monari (Notary Public) personally appeared STEVEN EUGENiO
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/sbe/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(§) on the instrument the person(s), or the entity upon behalf of which the person(8). acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California the the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
L. MONARI
COMM. #2414376¢
NOTARY PUBLIC-CALIFORNIA
SAN DIEGO COUNTY
Signature (Seal)
Name of Document: NoN- Colvusion Affisavit
LUCAS MONARI
loan signing agent
notary public
+1 (858) 405-5018
[email protected]
SAN DIEGO - CA
@monarinotary
monarinotarysandiego.com
CITY OF MURRIETA, DEPARTMENT OF PUBLIC WORKS
BIDDER'S AGREEMENT
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CITY PROJECT NO. 10-340
CIP No. 8079
The undersigned also agrees as follows:
FIRST: Execute the Contract, scan, and submit with the online electronic proposal.
SECOND: Within ten (10) calendar days from the receipt of the Notice of Award of Contract, furnish to City, two (2) satisfactory bonds in the amounts specified in the Notice Inviting Bids guarantying the faithful performance of the work and payment of bills.
THIRD: To begin work within ten (10) calendar days after the date specified in the Notice to Proceed.
Accompanying this proposal is cash, a cashier's check, a certified check, or a bidder's bond for not less than ten percent (10%) of the total amount of the bid payable to City which is to be forfeited, as liquidated damages, if, in the event Contractor does not execute the Contract and furnish satisfactory bonds under the conditions and within the time specified in this proposal, otherwise said cash, cashier's check, certified check, or bidder's bond is to be returned to the undersigned. Within fifteen (15) calendar days after award of this Contract, City will return the bidder's bond accompanying such proposal not considered in making the award. All other bidder's bonds will be held until the Contract has been finally executed; they will then be returned to the bidders whose proposals they accompany.
Rove Engineering, Inc. Steven Eugenio -President, Yesenia Eugenio - Secretary, Barbara Robinson- Treasurer, Karla Oceguera -Manager
BIDDER'S NAME
8291 Aero Place #100 San Diego, CA 92123
BIDDER'S ADDRESS
IMPORTANT NOTICE: If bidder is a corporation, state legal name of corporation and names of the president, secretary, treasurer, and manager; if eo-partnership, state true name of firm and names of all individual co-partners composing firm; or, if individual, state fist and las
President 4|17|25
Officer's Signature Title Date
Officer's Signature Title Date
Officer's Signature Title Date
Signature and title of the officers) set forth above shall be authorized to sign contracts on behalf of the corporation, co-partnership, or individual. If signature is by an agent, other than an officer of the corporation or a member of a partnership, a Power of Attorney must be on file with City prior to or at time of bid opening; otherwise, the bid will be subject to rejection by City Council.
PROPOSAL P-13
CITY OF MURRIETA, DEPARTMENT OF PUBLIC WORKS
CALIFORNIA AIR RESOURCES BOARD (CARB)
ACKNOWLEDGEMENT FORM
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CITY PROJECT NO. 10-340
CIP No. 8079
This is to Certify that
ROVE ENGINEERING, INC.
(FILL IN CONTRACTOR'S NAME)
(hereinafter the "undersigned") acknowledges that they have read and shall comply with the requirements of Title 13: California Code of Regulations, Chapter 9: Off-Road Vehicles and Engines Pollution Control Devices, Article 4.8: In-Use Off-Road Diesel-Fueled Fleets sections 2449, 2449.1, and 2449.2 as described in these provisions. The undersigned shall provide their Certificate of Reported Compliance: In-Use Off- Road Diesel-Fueled Fleets (CARB) with their electronic bid prior to the bid date and time.
In addition, the undersigned acknowledges that they are responsible for gathering and submitting with their electronic bid any CARB Certificate(s) of Reported Compliance: In-Use Off-Road Diesel-Fueled Fleets for any listed Subcontractors utilizing a fleet that falls under these same provisions prior to the date and time of Dated: 4117/25 By:
Steven Ingenio Pressitat
Print Name and Title
PROPOSAL P-14
California Environmental Protection Agency
Air Resources Board
January 1, 2025
CERTIFICATE OF REPORTED COMPLIANCE
OFF-ROAD DIESEL VEHICLE REGULATION
is issued to
ROVE ENGINEERING INC.
This certificate indicates that the fleet listed above has reported off-road diesel vehicies to the California Air Resources Board and has certified they are in compliance with title 13 CCR, section 2449 All applicable vehicles owned by the individual, company, or agency must be reported and labeled, as specified in Section 2449, with all possible completeness, else this certificate is null and void. Certificate expires 2/28/2026 Off-road Diesel Fleet Identification
154565
lack Kitowski
Chief, Mobile Source Control Division To verify the authenticity of this certificate, enter this number at California Air Resources Board
http://www.arb.ca.gov/doors/compliance_cert1.html
California Environmental Protection Agency
Air Resources Board
January 1, 2025
CERTIFICATE OF ReporteD COMPLIANCE
OFF-ROAD DIESEL VeHICLE REGULATION
is issued to
SOUTHWEST V-DITCH, INC.
This certificate indicates that the fleet listed above has reported off-road diesel vehicles to the California Air Resources Board and has certified they are in compliance with title 13 CCR section 2449. All applicable vehicles owned by the individual, company, or agency must be reported and labeled, as specified in Section 2449, with all possible completeness, else this certificate is null and void. Certificate expires 2/28/2026 Off-road Diesel Fleet Identification
4205
Jack Kitowski
Chiet, Mobile Source control Division
To verify the authenticity of this certificate. enter this number at http://www.arb.ca.gov/doors/compliance_cert1.html
California Environmental Protection Agency
Air Resources Board
January 1, 2025
CERTIFICATE OF REPORTED COMPLIANCE
OFF-ROAD DIESEL VEHICLE REGULATION
is issued to
AMERICAN PAVEMENT SYSTEMS INC.
This certificate indicates that the fleet listed above has reported off-road diesel vehicles to the California Air Resources Board and has certified they are in compliance with title 13 CCR, section 2449. All applicable vehicles owned by the individual, company, or agency must be reported and labeled, as specified in Section 2449, with all possible completeness, else this certificate is null and void. Certificate expires 2/28/2026 Off-road Diesel Fleet Identification
85565
Jack Kitowski
Chief, Mobile Source Control Division To verify the authenticity of this certificate, enter this number at California Air Resources Board
http://www.arb.ca.gov/doors/compliance_cert1.html
California Environmental Protection Agency
Air Resources Board
January 1, 2025
CERTIFICATE OF REPORTED COMPLIANCE
OFF-ROAD DIESEL VEHICLE REGULATION
is issued to
J&A STRUCTURES, INC.
This certificate indicates that the fleet listed above has reported off-road diesel vehicles to the California Air Resources Board and has certified they are in compliance with title 13 CCR, section 2449. All applicable vehicles owned by the individual, company, or agency must be reported and labeled, as specified in Section 2449, with all possible completeness, else this certificate is null and void Certificate expires 2/28/2026 Off-road Diesel Fleet Identification
251277
Jack Kitowski
Chief, Mobile Source Control Division
To verify the authenticity of this certificate, enter this number at California Air Resources Board
http://www.arb.ca.gov/doors/compliance_cert1.html
California Environmental Protection Agency
Air Resources Board
January 1, 2025
CERTIFICATE OF REPORTED COMPLIANCE
OFF-ROAD DIESEL VEHICLE REGULATION
is issued to
SUPERIOR PAVEMENT MARKINGS, INC.
This certificate indicates that the fleet listed above has reported off-road diesel vehicles to the California Air Resources Board and has certified they are in compliance with title 13 CCR section 2449. All applicable vehicles owned by the individual, company, or agency must be reported and labeled, as specified in Section 2449, with all possible completeness, else this certificate is null and void. Certificate expires 2/28/2026 Off-road Diesel Fleet Identification
245580
Chie Mobile Source control Driscon
To verify the authenticity of this certificate, enter this number at California Air Resources Board
http://www.arb.ca.gov/doors/compliance_cert1.html
CALIFORNIA
AIR RESOURCES BOARD
Certificate of Reported Compliance With:
Truck and Bus Regulation
Issued to: Superior Pavement Markings Inc.
This certificate confirms that the fleet owner has attested under penalty of perjury that the statements and information they provided to the California Air Resources Board (CARB) are true, accurate, and complete regarding all relevant vehicles in the fleet required to show compliance. CARB hereby finds that the fleet listed has reported compliance with:
Title 13 CCR 2025 (Truck and Bus Regulation)
If CARB subsequently finds that the statements and information that have been provided are not true, accurate, and complete, this certificate shall be effectively revoked and the fleet subject to noncompliance penalties.
This certificate is valid until December 31, 2025
TRUCRS Fleet Identification
Printed on 2025-01-06
Jack Kitowaki 151395
Jack Kitowski 4 Vehicles
Division Chief, Mobile Source Control To verify the authenticity of this certificate, visit DivisionCalifornia Air Resources Board www.arb.ca.gov/msprog/onrdlesel/tbbokup.php
CALIFORNIA
AIR RESOURCES BOARD
Certificate of Reported Compliance With:
Truck and Bus Regulation
Issued to: Elecnor Belco Electric Inc.
This certificate confirms that the fleet owner has attested under penalty of perjury that the statements and information they provided to the California Air Resources Board (CARB) are true, accurate, and complete regarding all relevant vehices in the fleet required to show compliance. CARB hereby finds that the fleet listed has reported compliance with:
Title 13 CCR 2025 (Truck and Bus Regulation)
If CARB subsequently finds that the statements and information that have been provided are not true, accurate, and complete, this certificate shall be effectively revoked and the fleet subject to noncompliance penalties.
This certificate is valid until December 31, 2025
TRUCRS Fleet Identification
Printed on 2025-03-05
Jack Kitowaki 152490
Jack Kitowski 20 Vehicles
Division Chief, Mobile Source Control To verify the authenticity of this certificate, visit Division California Air Resources Board www.arb.ca.gov/msprog/onrdiesel/tblookup.php California Environmental Protection Agency
Air Resources Board
January 1, 2025
CERTIFICATE OF REPORTED COMPLIANCE
OFF-ROAD DIESEL VEHICLE REGULATION
is issued to
ELECNOR BELCO ELECTRIC INC
This certificate indicates that the fleet listed above has reported off-road diesel vehicles to the California Air Resources Board and has certified they are in compliance with title 13 COR section 2449. All applicable vehicles owned by the individual company, or agency must be reported and labeled as specified in Section 2449 with all possible completeness, else this certificate is null and void Certificate expires 2/28/2026 Off-road Diesel Fleet Identification
152988
Chiet, Mobile Sousee Control Disin
To verify the authenticity of this certificate, enter this number st Callorsia Ar Resouroes Beard
http://www.arb.cagov/doors/compliance_cert1.html
California Environmental Protection Agency
Air Resources Board
January 1, 2025
CERTIFICATE OF REPORTED COMPLIANCE
OFF-ROAD DIESEL VEHICLE REGULATION
is issued to
ALLIANCE DIVERSIFIED ENTERPRISES, INC.
This certificate indicates that the fleet listed above has reported off-road diesel vehicles to the Callfamia Air Resources Board and has certified they are in compllance with title 13 CCR section 2449. All applicable vehicles owned by the individual, company, or agency must be reported and labeled as specified in Section 2449, with all possible completeness, else this cerifeste is null and void. Certificate expires 2/28/2026 Off-road Diesel Fleet Identification
87948
Jack Kitowski
Chet, Mable Source Control Division To verity the authenticity of this certificate, enter this number at California Air Resources Band http://www.arb.ca.gov/doors/compliance_cert1.html
CALIFORNIA
AIR RESOURCES BOARD
Certificate of Reported Compliance With:
Advanced Clean Fleets Regulation
Truck and Bus Regulation
Issued to: Alliance Diversified Enterprises, Inc.
This certificate confirms that the fleet owner has attested under penalty of perjury that the statements and information they provided to the California Air Resources Board (CARB) are true, accurate, and complete regarding all relevant vehicles in the fleet required to show compliance. CARB hereby finds that the fleet listed has fletch sections 20t3: 2016 (Advanced Clean Fleets Regulation) Title 13 CCR 2025 (Truck and Bus Regulation)
If CARB subsequently finds that the statements and information that have been provided are not true, accurate, and complete, this certificate shall be effectively revoked and the fleet subject to noncompliance penalties.
This certited 8li 2025989enger 31, 2025
TRUCRS Fleggiggification
Jack Kitowaki 15 Vehicles
Jack Kitowski
Division Chief, Mobile Source Control To verify the authenticity of this certificate, visit Division California Air Resources Board www.arb.ca.gov/msprog/onrdlesel/tblookup.php California Environmental Protection Agency
Air Resources Board
January 1, 2025
CERTIFICATE OF REPORTED COMPLIANCE
OFF-ROAD DIESEL VEHICLE REGULATION
is issued to
MARINA LANDSCAPE
This certificate indicates that the fleet listed above has reported off-road diesel vehicles to the California Air Resources Board and has certified they are in compliance with title 13 CCR section 2449. All applicable vehicles owned by the individual, company, or agency must be reported and labeled as specified in Section 2449, with all possible completeness, else this certificate is null and void. Certificate expires 2/28/2026 Off-road Diesel Fleet Identification
7497
lack Kitomski
Chief, Mobile Source Control Division
To verify the authenticity of this certificate. enter this number at California Air Resources Snard
http://www.arb.ca.gov/doors/compliance_cert1.html
CITY OF MURRIETA, DEPARTMENT OF PUBLIC WORKS
STATEMENT OF ASPHALT RUBBER AGGREGATE MEMBRANE (ARAM)
CONTRACTOR EXPERIENCE
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CITY PROJECT NO. 10-340
CIP No. 8079
The Contractor or Subcontractor completing the Asphalt Rubber Aggregate Membrane (ARAM) work shall have completed a minimum of five (5) ARAM projects in the last three (3) years. Submit project name, agency/owner, project engineer, quantity of ARAM installed (SF or SY) and construction dates.
Agency Project Name Agency Contact • Quantity • Construction Dater FY 2023-2024 Phase 3 Annual Street
City of San Fernando Resurfacing Project Manuel Fabian 54,316 SY 8/31/24-9/5/21 2023 Street Rehabilitation and Maintenance
City of Escondido Project - Phase 2 Ed Dominique 166,199 SY 7/15/24-7/22/24 2022/2023 Arterial and Minor Streets
City of Riverside Maintenance, Phase 3 Steve Howard 106,412 SY 10/30/24-11/4/24 City of Menifee Local Roads Resurfacing Project CIP 24-19 Carlos Geronimo 15,325 SY 7/12/2024 |2024 Street Maintenance Slurry Seal, Cape
City of Ontario Seal, and CDBG Street Pavement Management | Yesenia Lopez 42,522 SY 11/7/24-11/8/24 Dated: 4/17/2025 By: Lucas Dias
(Signature)
Lucas Dias - Project Manager
(Print Name and Title)
PROPOSAL P-15
CITY OF MURRIETA, DEPARTMENT OF PUBLIC WORKS
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CITY PROJECT NO. 10-340
CIP No. 8079
(ITEM ESTIMATED UNIT TOTAL ITEM
NO. I DESCRIPTION QUANTITY UNIT PRICE PRICE
VIA FRONTERA WATER LINE IMPROVEMENTS
1 Install 8" C-900, DR-18 PVC Pipe (EMWD B-408) 421 LF
2 Connect to 12" Regulated Main 1 EA
3 Connect to 8" Water Line 1 EA
4 Replace Water Service Connects 8 EA
5 Install 8" R.G.S.V. (EMWD B-255) 5
6 Install 12" R.G.S.V. (EMWD B-255) 2
7 Install Air Relief Valve (EMWD B-598) 1
8 Install 45 ° Elbow 4 S$558S5
9 Install 8" Tee (EMWD B-663)
10 Install 12" Tee (EMWD B-663)
11 Install Thrust Block (EMWD B-407) 1
12 Install Restrained Joints (EMWD B-663) 341 LF
13 Install Steel Casing (EMWD B-575) 20 LF
"CONTRACTOR SHALL ENTER THEIR LUMP SUM COST FOR ALL ITEMS LISTED ABOVE UNDER THE BASE BID ITEM ON PLANET BIDS FOR "Furnish and Install 8" PVC per Via Frontera Water Improvement Plan (Appendix E, D-61961 through D-61963)
APPENDIX E E-2
ADDENDUM NO. 1
CITY OF MURRIETA
DEPARTMENT OF PUBLIC WORKS/ENGINEERING
PLANS, SPECIFICATIONS, AND CONTRACT DOCUMENTS
FOR
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CIP NO. 8079, CITY PROJECT NO. 10-340
JANUARY 28, 2025
The following changes) have been made to the bid documents, plans, and/or specifications posted on Planetbids and shall be incorporated into the bid. The referenced change(s) are as follows:
The bid due date has been changed to THURSDAY, FEBRUARY 27, 2025 at 2:00:00 P.M. In addition, updated Improvement and Utility Plans, Specifications, and Bid Documents will be issued via a forthcoming addendum. This forthcoming addendum will also address any outstanding questions that have been submitted on Planetbids. Additional information regarding these changes will be released in a timely manner to allow bidders an adequate amount of time to review and incorporate any changes into their bid.
*End Insertion
The Bid Date and Time has been changed as follows:
THURSDAY, FEBRUARY 27, 2025 at 2:00:00 P.M.
ADDENDUM NO. 2
CITY OF MURRIETA
DEPARTMENT OF PUBLIC WORKS/ENGINEERING
PLANS, SPECIFICATIONS, AND CONTRACT DOCUMENTS
FOR
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CIP NO. 8079, CITY PROJECT NO. 10-340
FEBRUARY 19, 2025
The following changes) have been made to the bid documents, plans, and/or specifications posted on Planetbids and shall be incorporated into the bid. The referenced change(s) are as follows:
The bid due date has been changed to THURSDAY, MARCH 20, 2025 at 2:00:00 P.M. The deadline for submitting pre-bid questions online via Planetbids has been extended to THURSDAY, MARCH 13, 2025 AT 2:00:00 P.M.
In addition, updated Improvement and Utility Plans, Specifications, and Bid Documents will The Bid Date and Time has been changed as follows:
THURSDAY, MARCH 20, 2025 at 2:00:00 P.M.
ADDENDUM NO. 3
CITY OF MURRIETA
DEPARTMENT OF PUBLIC WORKS/ENGINEERING
PLANS, SPECIFICATIONS, AND CONTRACT DOCUMENTS
FOR
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CIP NO. 8079, CITY PROJECT NO. 10-340
March 17, 2025
The following changes) have been made to the bid documents, plans, and/or specifications posted on Planetbids and shall be incorporated into the bid. The referenced changes) are as follows:
Addendum No. 3 Items:
The street improvement plans (Sheets 1-40) and the Landscape and Irrigation Plans (Sheets 1-18) have been revised, finalized and signed. A number of Bid Items have either been removed, changed, added, and/or created as additive bid items on the Bid Sheet.
Approved construction drawings for SCE (5 sets of plans), drawings for Frontier and the Gas Company, and an exhibit showing asphalt digout locations have been added to the Appendices. Previously provided Street Improvement Plans, Landscape and Irrigation Plans and Specifications from the original bid posting date on 12/30/24 are hereby considered obsolete and the new Bid Documents (Street Improvement Plans, Landscape and Irrigation Plans and Specifications) issued via Addendum No. 3 shall be downloaded from PlanetBids and considered the current Bid Documents.
Q&A RELEASE OF QUESTIONS:
A total of 94 questions and answers have been released as part of Addendum No. 3. Please refer to the Q&A section on Planetbids, Release Questions Set 3.
The bid due date has been changed to THURSDAY, APRIL 3, 2025 at 2:00:00 P.M. The leadline for submitting pre-bid questions online via Planetbids has been extended t WEDNESDAY, MARCH 26, 2025 AT 2:00:00 P.M.
The Bid Date and Time has been changed as follows:
THURSDAY, APRIL 3, 2025 at 2:00:00 P.M.
ADDENDUM NO.4
OF MU RRIE
CITY OF MURRIETA
DEPARTMENT OF PUBLIC WORKS/ENGINEERING
PLANS, SPECIFICATIONS, AND CONTRACT DOCUMENTS
FOR
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CIP NO. 8079, CITY PROJECT NO. 10-340
APRIL 1, 2025
The following change(s) have been made to the bid documents, plans, and/or specifications posted on Planetbids and shall be incorporated into the bid. The referenced change(s) are as The bid due date has been changed to THURSDAY APRIL 17", 2025 at 2:00:00 P.M. The and/or contract documents. Please note that the City does not anticipate any further changes to the bid due date.
The Bid Date and Time has been changed as follows:
THURSDAY, APRIL 17, 2025 at 2:00:00 P.M.
ADDENDUM NO. 5
RRIET
CITY OF MURRIETA
DEPARTMENT OF PUBLIC WORKS/ENGINEERING
PLANS, SPECIFICATIONS, AND CONTRACT DOCUMENTS
FOR
MURRIETA HOT SPRINGS ROAD WIDENING PROJECT
CIP NO. 8079, CITY PROJECT NO. 10-340
April 9, 2025
The following change(s) have been made to the bid documents, plans, and/or specifications posted on Planetbids and shall be incorporated into the bid. The referenced change(s) are as follows:
1. Pier and Lagging Walls
The following language is from the supplemental geotechnical report for this Project. "Per the Geotechnical report and supplemental geotechnical recommendations, the drilled piers are expected to be primarily embedded into dense Pauba Formation, which generally consists of silty sand and clayey sand. Groundwater is not expected to be encountered. However, shallow perched ground water could develop during periods of high precipitation. As such, conditions should be verified prior to construction and if groundwater is to be encountered within the depth excavated, appropriate measures will need to be taken to allow for proper construction of the proposed piles/drilled piers.
Based on known soil conditions, it is anticipated that the excavated pile shaft would remain open during construction without side support. Localized side collapse may occur especially in cohesionless or clean sand materials. If required, casings may be required to be used to support the open excavation during construction."
The City will provide geotechnical observation and testing during construction to confirm actual soil conditions and provide any updated/revised recommendations, when and if needed Epoxy coating - Soldier Beams
The City has elected not to epoxy coat the soldier beams for the purpose of rust prevention (corrosion). Instead, soldier beams shall be painted for corrosion protection with an inorganic
zinc-rich primer. Primers shall be per Caltrans authorized material list for inorganic zine-rich primer. Specification requirements shall be based on Section 59-2 and Section 91-2.02A of the Caltrans Standard Specifications. A submittal will be required for approval prior to ordering and installation.
Following the primer coat, the soldier beams will be painted with an enamel finish. A submittal will be required for approval prior to ordering and installation.
Specifications for the Primer and Paint of the soldier beams are hereby incorporated into the Bid Specifications as follows:
59-2 PAINTING STRUCTURAL STEEL (SOLDIER BEAM RUST PROTECTION AND PAINTING) 59-2.02 PAINTING STEEL SOLDIER PILES
59-2.02B MATERIALS
[Replace with the following:]
A. Products shall be as follows:
1. Primer (rust prevention) shall be per Caltrans' Authorized Material List for Inorganic Zinc-Rich Primer as follows:
CALIFORNIA DEPARTMENT OFTRANSPORTATION
Caltrane
AUTHORIZED MATERIAL LIST FOR INORGANIC ZINC-RICH PRIMER Inorganic zine primer is used for coating new structural steel used on California Department of Transportation (Caltrans) projects. Uses are typically steel in bridges, soldier pile walls, and column casings.
Specification requirements for inorganic zinc primer are in Section 59-2 and Section 91-
2.02A of the 2018 Standard Specifications. Coatings selected from the list must meet the volatile organic content (VOC) restrictions of local Air Quality Management Districts in which they are applied.
Section 91-1.01D of the Standard Specifications does not apply for materials on this Authorized Material List (AML)
Evaluation Criteria: Inorganic Zinc-Rich Primer Authorization Requirements and Acceptance Criteria.
Manufacturer Product Name AASHTO VOC, Reauthorization
M 300 g/L Date
Type
Carboline Carbozinc 11 WB 6/2025
(zero)
Carboline Carbozinc 11 HS 288 6/2025
Carboline Carbozinc 11 VOC 389 6/2025
Sherwin Williams Zinc Clad XI 6/2025
Sherwin Williams Zinc Clad I Ethyl Silicate 462 6/2025
Sherwin Williams Zinc Clad II Plus 320 6/2025
Sherwin Williams Zinc Clad DOT 310 6/2025
International Interzinc 22 490 6/2025
Paint / Akzo
Nobel
International Interzinc 22 HS T 340 6/2025
Paint / Akzo
Nobel
PPG-Protective Dimetcote 21-5 6/2025
and Marine
Coatings (PMC)
PPG-PMC Dimetcote 9 491 6/2025
PPG-PMC Dimetcote 9H 323 6/2025
Products on this Authorized Material List (AML) are products that have been evaluated and found acceptable for use, provided the products are used in accordance with the manufacturer's instructions. Caltrans may perform additional job control testing during construction or installation.
If you have questions about this AML, please contact the Caltrans Chemistry branch by e-mail sent to: chemistry. branch@,dot.ca.gov
2. Paint: Paint shall be PPG PSX 700 Polysiloxane Engineered Siloxane Coating - Gloss RAL-6009, or approved equal. Any substitutions must be submitted to Agency for approval.
B. Materials selected for coating systems for each type surface shall be the product of a single manufacturer.
C. Accessory materials such as turpentine, thinner, and putty shall be of the highest quality and by Agency approved manufacturer.
D. Finish coats shall not be thinned without Agency's approval. Sufficient coats shall be applied at no additional cost to completely hide base materials, produce uniform color and provide satisfactory finish result.
E. All submitted paint products to be in compliance with all local, state and federal air quality mandates, including latest California Air Quality Management District (AQMD) standards.
F. All colors are to be selected or approved by the Agency. All prime coats shall be tinted to be contrast the finish coat. The final coat of paint shall not be applied until the Agency has approved colors.
59-2.01C(3) SURFACE PREPARATION
[Add the following to the subsection:]
A. All surfaces to receive paint shall be clean, dry, smooth, and dust free before application of any materials. Prepare surfaces as follows:
1. PRIMED FERROUS METAL: Remove all foreign matter. Touch up abrasions with Primer.
2. UNPRIMED FERROUS METAL: Remove all rust, mill scale and foreign matter by wire brushing, scraping, sandblasting or solvent as required to provide a clean, smooth surface.
Spot prime with Primer.
3. GALVANIZED METAL: Remove all foreign matter and clean entire surface with mineral spirits. Apply Primer the same day as pretreatment is applied.
4. Surfaces that cannot be prepared or painted as specified shall be immediately brought to the attention of the Agency in writing.
5. Starting of work without such notification will be considered acceptance by the Contractor of surfaces involved
6. The Contractor shall replace unsatisfactory work caused by improper or defective surfaces as directed by the Agency at no additional cost to the Agency. 59-2.01C(4) PAINTING (APPLICATION)
[Add the following to the subsection:]
A. Do not apply initial coating until moisture content of surface is within limitations recommended by the paint manufacturer. Application:
1. Primer specified shall be applied in one (1) full coat and (1) final coat (if required by manufacturer) at proper consistency and thickness in accordance with manufacturer's recommendations. In the event that a coat does not adequately cover substrate, additional coats shall be applied at no cost to the City.
2. Paint specified shall be applied in one (1) full coat and (1) final coat (if required by manufacturer) at proper consistency and thickness in accordance with manufacturer's recommendations. In the event that a coat does not adequately cover substrate, additional coats shall be applied at no cost to the City.
3. Primer shall be applied to all surfaces/sides/planes of the soldier beam. The limits of primer shall start at the top of the beam and extend twelve inches (12) into the concrete shaft (12" below bottom of the shoring wall (B.O.S.W.)). Reference Detail 4, Sheet 39.
Paint shall be applied to all surfaces/sides/planes of the soldier beam. The limits of painting shall start at the top of the beam and extend twelve inches (12") into the concrete shaft (12" below bottom of the shoring wall (B.O.S.W.)). Reference Detail 4, Sheet 39.
5. Apply primer and paint with suitable brushes, rollers, or spraying equipment in accordance with manufacturer's recommendations and guidelines.
6. Rate of application shall not exceed that which is recommended by the primer and paint manufacturer for surface involved.
B. Comply with recommendations of product manufacturer for drying time between succeeding coats.
C. Make edges of paint adjoining other material or color clean and sharp with no overlapping.
D. Repainted surfaces rejected by the inspector shall be made good at the expense of the Contractor. Small affected areas may be touched up; large effected areas or areas without sufficient dry film thickness of paint shall be repainted. Runs, sags or damaged paint shall be removed by scraper or by sanding prior to application of paint.
E. All materials shall be applied evenly with proper film thickness and free of runs, sags, skips and other defects.
F. Wash exposed metal with solvent then prime and paint as scheduled G. Contractor is advised that overhead power lines and utilities are present and in the near vicinity of the soldier beams to be primed and painted. Contractor shall exercise necessary care to maintain proper distance to overhead power lines in accordance with Public Utility Commission General Order 95 (GO95).
CU-STRUCTURAL SOIL
CU-structural soil was incorrectly identified to be utilized in the dispersion areas. The correct soil and soil components/amendments have been identified for use in the dispersion areas, and are hereby incorporated into the Bid Specifications. Replace Sections 301-6 and 301-6.1 of the bid specifications as follows:
301-6 DISPERSION AREAS
[add the following]:
301-6.1 BIOFILTRATION SOIL MEDIA (AMENDED SOIL)
Biofiltration Soil Media (BSM), or approved equal, shall be installed, complete and in place, in compliance with Section 3.8 of the 2018 Riverside County LID BMP Manual, including all crrata, and as shown below.
BSM Mixture Component proportions and types:
Component Type Biofiltration
Sand Type Washed
Sand Fraction, by volume 60%
Topsoil Type Sandy Loam (Loamy Sand shall not be used)
Topsoil Fraction, by volume 20%
Organic Type Coconut coir pith, or peat
Organic Fraction, by volume 20%
BSM shall be blended before it's delivered to the site using a mechanical mixing method (i.e. drum mixer) to ensure uniform mixing. Using a loader to mix materials on site is not adequate for uniform mixing and shall not be used. BSM shall be lightly compacted and placed in loose lifts approximately 12 inches thick to ensure reasonable settlements without excessive compaction. Compaction within the BSM areas should not exceed 75 to 85% standard proctor within the designated depth of BSM. Machinery shall not be used in the BSM area to place BSM.
Placement methods and BSM quantities shall account for approximately 10 to 15% volume loss due to compaction and settling. Planting methods and time shall account for settling of media without exposing plant root systems.
The City may require up to three double ring infiltrometer tests (ASTM D3385) or approved alternative tests to confirm that the placed materials meet applicable hydraulic suitability criteria.
If the infiltration rate of placed material does not meet applicable criteria, the City may require replacement and/or decompaction of materials. The cost for testing shall be at City's expense.
Testing of the mixed BSM shall be required as specified in Section 3.8 of the LID BMP Manual, or a Certificate of Compliance can be submitted to the City for approval in lieu of testing.
Mulch for BSM
Dispersion areas shall be covered with 3 inches of well-aged, double or triple non floating mulch. Non-floating, organic mulch must be used between plants in the dispersion areas to help minimize weed growth and reduce soil water loss. Pea gravel or other inorganic mulch/top dressing shall not be used because it heats the soil leading to increased water evaporation.
PIER AND LAGGING WALL
The payment clause for the Pier and Lagging Retaining Wall has changed and now includes casings (if needed), primer and paint of the I-beams, and clarification on payment for excavation and backfill, and is hereby incorporated into the Bid Specifications as follows:
303-4.1.5 PAYMENT
[Replace the entire first paragraph with the following:] Payment for the Pier and Lag Retaining wall will be paid for at the Contract unit price per Square Foot from the Top of the Shoring Wall (T.O.S. W.) to the Bottom of the Shoring Wall (B.O.S.W.) and shall include furnishing all labor, materials, tools, equipment, casings, shop drawings, excavation, backfill, compaction, inorganic zinc-rich primer and paint (as specified in Section 59-2 Painting Structural Steel), and incidentals as shown on the plans and construction details to construct the Beams (Total Depth - 'H' + 'D') and 4" × 12" and 6" × 12" Lagging as shown complete in place per the Retaining Wall plans.
The limits of excavation and backfill paid for the pier and lagging retaining wall system shall begin at the face of the wall and extend into the existing slope as needed per plan, and shall include overexcavation and recompaction to the bottom of the shoring wall (B.O.S.W). Payment also includes the unclassified excavation (drilling) of the shafts (and removal and disposal of spoils or reused as unclassified fill) which extend beyond the face of the wall and behind the back of the wall. No additional compensation will be allowed therefor.
Bid Item No. 57 - Relocate Existing B'Nai Chaim Monument (Sheet 12) The type of footing for the existing monument sign at the northeast corner of Via Princesa is unknown. It may be possible to excavate and relocate the entire monument sign (with footing) to
it's new location. The means and methods of relocating or reconstructing the monument footing shall be the Contractor's responsibility. Should a new footing be needed, it shall be included in the Lump Sum Bid price, as well as removal and disposal of the old footing. 303-4.1.5 PAYMENT
[Add the following paragraph:]
Payment for relocation of the existing B'Nai Chaim Monument shall be made at the Contract Lump Sum price as shown on the bid schedule and shall include furnishing all labor, materials, tools, equipment, excavation, backfill, compaction, disposal of existing concrete footing (if needed) and incidentals as shown on the plans. Concrete for footings, steel, rebar, ties, labor and equipment required shall also be included in the Contract Lump Sum price and no additional compensation will be allowed therefor.
42" Guard Rail Fence (Safety Cable Railing)
The safety cable rail system shall be installed per 2018 Caltrans Standard Plans B11-47.
Specifications per Section 83 Railings and Barriers and Section 93-2.07 Cable Railings. Posts, caps and braces shall be galvanized in accordance with Section 75-1.02B Galvanizing; and not epoxy coated. The improvement plans have been updated to reflect these changes.
Please note that permanent Cable Railing is only required on the south side of Murrieta Hot Springs Road. Due to the proposed sound wall and tubular steel fence on the north side of Murrieta Hot Springs Road, permanent cable railing is not required and temporary cable railing as required per CAL-OSHA guidelines.
Any reference to epoxy coating the guard rail fence has been removed from the improvement plans and specifications. The payment clause for the 42" Guard Rail Fence has changed and now includes reference to the galvanizing of the posts, caps and braces and is hereby incorporated into the Bid Specifications as follows:
PAYMENT FOR 42" GUARD RAIL FENCE
[Replace the entire paragraph with the following:]
Payment for 42" Guard Rail fence (Safety Cable Railing) will be paid for at the unit price per Linear Foot and shall include furnishing all labor, materials, tools, equipment, and incidentals as shown on the plans, construction details and 2018 Caltrans Standard Plan B11-47. Materials shall be in accordance with Section 83-2.07 Cable Railings and galvanized per Section 75-1.02B.
No additional compensation will be allowed therefor.
PAVERS (RIDGEGATE COMMUNITY DRIVEWAY ENTRANCE)
Detail A on sheet 3.7 of the Landscape and Irrigation Plans has changed.
Pavers shall be standard 4" × 8" pavers. Style: Old Town Holland, Pattern: Herringbone, Color:
Brownstone. Concrete pavers shall be underlain by a minimum of 12 inches of Class 2 aggregate base, overlain by a leveling-course of clean sand (2 inches, S.E. >30), or per the manufacturers guidelines. Pavers should have a maximum aspect ratio of 3:1 or less, conform with ASTM C
936 standards, and be placed in a "herringbone pattern." Concrete edge-restraints, or curbing will be required to prevent lateral drifting. Prior to aggregate base placement the subgrade soils shall be overexcavated (depth 24") and recompacted to a minimum relative compaction of 95 percent in two (2) equal lifts. Aggregate base compaction should also be 95 percent of the maximum dry density (per ASTM D-1557), placed and compacted in two (2) equal lifts. Should soft, or yielding subgrade soils be encountered during installation, a geotextile reinforcement (Tensar TriAx Geogrid [Type 2], or equivalent) should be placed over the yielding subgrade soils, prior to aggregate base placement. The geotextile reinforcement should be overlapped on firm and unyielding soils a minimum of two (2) feet, where feasible. Pavers and base material shall be able to support 50 tons, minimum.
The MATERIALS, INSTALLATION AND PAYEMENT sections for Interlocking Pavers has changed and is hereby incorporated into the Bid Specifications as follows:
303-9 INTERLOCKING PAVERS
303-9.3 MATERIALS
[Replace first paragraph with the following:]
Paver: RCP Old Town Holland Concrete Pavers, or approved equal Paver Type: Holland, or approved equal
Material Standard: Comply with material standards set forth in [ASTM C 936] Color: Brownstone
Color Pigment material Standard: Comply with ASTM C 979 Pattern: Herringbone (only applies to Ridgegate Community Driveway), Running Bond for medians on Murrieta Hot Springs Road
Size: 4"x 8"
Average Compressive Strength: 8000 psi (55 MPa) with no individual unit under 7200 psi (50 MPa)
Average Water Absorption (ASTM C 140): 5% with no unit greater than 7%.
Freeze/Thaw Resistance (ASTM C 67): Resistant to 50 freeze/thaw cycles with no greater than 1% loss of material
Substitutions requests to be submitted during the bid period and approved in writing by Engineer. 303-9.4 INSTALLATION
[Replace the first paragraph with the following:]
Edge restraints shall be installed around the perimeter of all ICP unit areas as noted per plans or as specified by the manufactures specifications. The top 12 inches of the base course shall be compacted to 90% and covered with geotextile fabric (non-woven 90N). When pavers are installed adjacent to asphalt (Ridgegate Community), the concrete pavers shall be underlain by a minimum of 12 inches of Class 2 aggregate base, overlain by a leveling-course of clean sand (2 inches, S.E. >30), or per the manufacturer's guidelines. Pavers should have a maximum aspect
ratio of 3:1 or less, conform with ASTM C 936 standards, and be placed in a "herringbone pattern." Concrete edge-restraints, or curbing will be required to prevent lateral drifting. Prior to aggregate base placement the subgrade soils shall be overexcavated (depth 24") and recompacted to a minimum relative compaction of 95 percent in two (2) equal lifts. Aggregate base compaction should also be 95 percent of the maximum dry density (per ASTM D-1557), placed and compacted in two (2) equal lifts. Should soft, or yielding subgrade soils be encountered during installation, a geotextile reinforcement (Tensar TriAx Geogrid [Type 2], or equivalent) should be placed over the yielding subgrade soils, prior to aggregate base placement. The geotextile reinforcement should be overlapped on firm and unyielding soils a minimum of two (2) feet, where feasible. Pavers and base material shall be able to support 50 tons, minimum. [Replace the first sentence of the third paragraph with the following:] For pavers installed in the raised median of Murrieta Hot Springs Road, spread bedding sand evenly over the base course and screed to a nominal 1-inch thickness, not exceeding 1½-inch thickness. For the pavers installed within the Ridgegate Community, spread bedding sand evenly over the base course and screed to a nominal 2-inch thickness. 303-9.5 PAYMENT
[Replace the entire paragraph as follows:]
Full compensation for conforming to the requirements of Interlocking Concrete Pavers including furnishing all labor, tools, equipment, excavation, compaction and materials noted herein and necessary for accomplishing the work complete and in place, shall be considered as included in the respective Contract Square Foot price bids for "Install 4"x 8" Concrete Pavers in Raised Median" and "Install Pavers (Ridgegate Community)" and no additional compensation will be allowed therefor.
CL-6 FENCE
CL-6 fence shall be installed per the 2018 Caltrans Standards and Specifications, not the 2015 Greenbook. The fabric required and the payment clause for the CL-6 Fence has changed and is hereby incorporated into the Bid Specifications as follows:
80-3 CHAIN LINK FENCES
80-3.02C Fabric
[Replace the first two paragraphs as follows:]
Chain link fabric must comply with AASHTO M181 for Type IV fabric with a black vinyl coating.
The wire for the fabric for the fabric must be:
1. 9 gauge core wire for fence 84 inches or less in height. Grade of wire shall be Class 2
2. 9) samal ors dand bed &d inaces in ye igat and for a slated chain link fence. Grade of wire shall be Class 2 thermally fused and bonded,
80-3.04 Payment
[Add the entire paragraph as follows:]
Payment for the CL-6 fence per Caltrans A85, A85A Fence will be paid for at the unit price per Linear Foot and shall include furnishing all labor, materials, tools, equipment, and incidentals as shown on the plans, construction details and specifications. This includes when fence is installed on top of retaining walls or storm drain culverts. No additional compensation will be allowed therefor.
Bid Item 68 - Construct Custom J-Ditch
Bid item 68 incorrectly identified the custom J-Ditch detail to be located on Sheet 2, Detail 43.
Detail 43 can be found on Sheet 15 and Bid Item 68 on PlanetBids has been corrected to reflect the correct location of said detail.
Bid Item 72 - Tubular Steel Fence
Sheet 15, Detail 67 (Elevation View) has been revised. The style and appearance of the fence has been changed per the detail below, and shall be incorporated into the improvement plans and bid as follows:
SEE BRACKET
DETAIL BELOW
2'-0"
10 ELEVATION
PART 7 - STREET LIGHTING
700 MATERIALS
700-1 GENERAL
[Add the following paragraphs:]
RIDGEGATE ENTRANCE MONUMENT LETTERING
Currently, the word "RIDGEGATE" is located on each of Ridgegate's entry monuments (2 total). See image below. The letters "RIDGEGATE" are currently illuminated by lights in ground in front of the walls. Power and service comes from the existing lighting controller and sensor that is currently located in the raised median. With the removal of these entry monuments, new "RIDGEGATE" letters (2 sets) will be attached to the proposed masonry sound walls. The new "RIDGEGATE" letters will be illuminated and backlit and provided by the Ridgegate HOA.
Contractor shall be responsible for the installation of new illuminated back-lit letters (2 sets) to the proposed sound walls and connect to the existing lighting timer and lighting sensor(s) that are being relocated and installed in the new Strongbox enclosure just to the west of the driveway entrance. Contractor shall ensure both sets of illuminated back-lit "RIDGEGATE" letters are in proper working dusk to dawn operation.
RIDCEGATE
Payment for the installation shall be included in the Contract unit Lump Sum price for Bid Item No. 81, complete in place and fully functional, and shall constitute full compensation for all materials, labor, equipment, tools, equipment, conduit, handholes, necessary appurtenances, design engineering and shop drawing preparation, obtaining City of Murrieta Electrical Permit, supplying all other materials needed for a complete installation, clearing and grubbing, earthwork, trenching, record of drawings, and all other work and incidentals necessary to properly construct and install the illuminated back-lit "RIDGEGATE" letters (2 sets) to the proposed sounds walls and no additional compensation will be allowed therefor.
PREVIOUSLY RELEASED QUESTIONS AND ANSWERS (Q&A) ON PLANETBIDS,
AND FURTHER CHANGES TO BID SPECIFICATIONS
1. The following question related to insurance forms and endorsements was previously submitted on PlanetBids:
Question: As California is a "pre-approval" state which means carriers have to file forms with the State and await approval for use, it is highly unlikely any carrier has filed these specific forms with the California Department of Insurance. In lieu of the City manuscript endorsements, will the City accept the standard Acord issued Certificate of Insurance along with the Arch Insurance Company additional insured/primary wording, waivers of subrogation, etc. endorsements as approved by the State of California?
Answer: Endorsements are required in accordance to section 15 (Instructions to Bidders).
Contractor shall submit insurance documents in accordance to section 15 (Instructions to Bidders) and the Contract.
The City would like to clarify the response as follows:
Insurance and endorsements are required in accordance with section 15 of the Instructions to Bidders. The Insurance and Endorsement forms provided in Appendix B of the Bid specifications are examples of acceptable endorsement forms; they are not required to be used.
The City will accept the standard Acord issued Certificate of Liability Insurance along with the additional insured provisions/primary wording, waivers of subrogation etc that meets the insurance requirements as specified in section 15 of the Instructions to Bidders and as approved by the State of California.
Section 15 Insurance - Instructions to Bidders within the bid specifications is hereby revised and incorporated into the Bid Specifications as follows:
[Replace the first sentence of the second paragraph with the following:] Notwithstanding Section 7-3 and 7-4 of the Standard Specifications for Public Works Construction, Contractor may utilize a standard Acord issued Certificate of Liability Insurance as approved by the State of California. The insurance and endorsement forms included in Exhibit "A" of Appendix B, are examples of acceptable endorsement forms, and are not required to be used.
2. The following three questions relate to EMWD's insurance requirements and were previously submitted on PlanetBids:
Question: Is Builder's Risk insurance required for this project? Answer: Please refer to section 15 in the Instructions to Bidders. Note that the insurance requirements have changed, and will be released via Addendum. EMWD requires Builder's Risk insurance (and other insurances) per Section F in Appendix E.
Question: In Section F, Labor and Construction, there is an insurance spec that is very different from the ones listed in the instructions to bidders. It is asking for Builder's Risk, Installation Floater Insurance, and Earthquake Riders for the Builder's Risk. Can the agency confirm that this insurance is required.
Answer: Insurance requirements in Section F are EMWD's insurance requirements, and are in addition to the City's insurance requirements. Note that the City's insurance requirements have been changed and will be made part of a future Addendum. Builder's Risk insurance is required by EMWD, not the City. Additionally, Installation Floater, Contractor's Equipment Floater, Flood and Earthquake insurance are also required by EMWD. Please refer to Appendix E.
Question: Is a Builder's Risk insurance policy required by the Contractor or is the City providing? The specs are unclear. If the City is providing the policy, what are the deductibles? Page F-7 notes that the Contractor is responsible for these costs if provided by "the District," or City.
Answer: Builder's Risk insurance is required by EMWD, not the City. Additionally, Installation Floater, Contractor's Equipment Floater, Flood and Earthquake insurance are also required by EMWD. Please refer to Appendix E.
The previous answers for all three questions given by the City were incorrect. EMWD's insurance requirements can be found in Section F in Appendix E (subsections F-03 and F-04).
Besides the standard Worker's Compensation, Commercial Liability and Automobile Insurance, EMWD requires Installation Floater and Equipment Floater Insurance. Per Section SC - Special Conditions, it does not appear that EMWD is requiring Builders Risk, Flood and Earthquake insurance.
Note that EMWD's insurance requirements are different than the City's. The higher amount requested for any given policy between the two agencies shall govern.
3. The following three questions are related to Water Meters and were previously submitted on PlanetBids:
Question: Will the new water meters be installed by the local Water District? Answer: Contractor to purchase and install any required new water meters, and make the necessary connections per plan.
Question: Are there any fees associated with the installation of the new water meters? Or will the Contractor run the POC from the water meter?
Answer: Contractor to purchase and install any required new water meters, and make the necessary connections per plan. City is responsible for all connection fees.
The City would like to clarify the previous response as follows: The City has purchased and paid for the two (2) water meters associated with Bid Item No. 129 - Install Water Meter per Water
Meter Plans - Appendix E, D-71584) in corporation with EMWD. EMWD shall provide said water meters; the contractor's responsibility is to install the water meters and associated work per Water Meter plans. Note that the City has also paid the connection fees and inspection fees.
Question: Reference Appendix E "Approved Water Meter Plan". There are two proposed hot taps to install two new services.
Answer: All work associated with the Water Meter plan, including proposed hot taps, are included in Bid Item No. 129.
The City would like to clarify the previous response as follows: Payment for Bid Item No. 129 shall include all work associated with installation of the water meters, including but not limited to: installation of 2" copper water service - 2 EA, installation of 1-1/2" water meter - 2 EA, installation of 1-1/2" reduced backflow preventer - 2 EA, Hot Tap Ex 16" CML&C Water Line with 16'x4" Saddled outlet connection with 4" FxF RSGV - 2 EA, and installation of Companion Flange - 2EA, all trenching, backfill, compaction, asphalt, aggregate base and all labor, materials, tools, equipment, and incidental and necessary work, complete and in place per the Water Meter Improvement Plan (D-71584), EMWD standards and City Standards and no additional payments will be allowed therefor.
Note that the City has submitted an application for service with EMWD and has paid for the two new meters, as well as the connection fees and inspection fees. The application is pending approval in receipt of the Contractor's insurance certificate and proof of class 'A' or 'C34' license.
Section 306-9 Water Improvements contained within the bid specifications is hereby revised and incorporated into the Bid Specifications as follows:
306-9 WATER IMPROVEMENTS
3.6-9.1 GENERAL
[Replace with the following:]
306-9.1 GENERAL Water valves, water meters, backflow devices, copper service connections, PVC water lines, flanges, RSGV valves, air release valves, blow off valves, fittings, elbows, tees, couplings, thrust blocks, fire hydrants and all water related appurtenances and improvements shall be installed as shown on the Plans, installed per Eastern Municipal Water District (EMWD) standards, and inspected by EMWD.
APPENDIX E - SC - SPECIAL CONDITIONS
The number of water services to be reconnected within the Ridgegate Community was incorrectly identified as 8 lateral service connections. There are 11 lateral service connections that will need to be reestablished. The number of existing water meters that require relocation with new lateral services was incorrectly identified as 2 EA. There are a total of 4 meters will require relocation with new lateral service connections. Lastly, there are a total of 19 Sewer Manholes to be adjusted or double adjusted to grade, not 18 Sewer Manholes as identified in the
Appendix E, Section SC - Special Conditions. PlanetBids correctly identifies 19 manholes to be adjusted.
Section SC-2 - Special Conditions, Appendix E is hereby revised and incorporated into the Bid Specifications as follows:
SC-02 Scope of Work
[Replace the second sentence of the first paragraph with the following:] The Contractor shall reconstruct or adjust (19) sewer manholes and (19) valve cans to grade, as necessary, to accommodate to the new street profile.
[Replace the second to last sentence of the first paragraph with the following:] The Contractor shall reconnect (1) fire hydrant, (1) air valve, (I1) water services, and (4) water meters.
Bid Item 136 - Relocate Existing Water Meters and Reconnect per EMWD STD. B-590A has changed from 2 EA to 4 EA
Bid Item 138 - Reconnect Existing 1" Water Service per EMWD STD. B-590A has changed from 8 EA to 11 EA
306-9.2 MEASUREMENT AND PAYMENT
[Add the following paragraph:]
Payment for Bid Item No. 129 shall include all work associated with installation of the water meters, including but not limited to: installation of 2" copper water service - 2 EA, installation of 1-1/2" water meter - 2 EA, installation of 1-1/2" reduced backflow preventer - 2 EA, Hot Tap Ex 16" CML&C Water Line with 16"x4" Saddled outlet connection with 4" FxF RSGV - 2 EÁ, and installation of Companion Flange - 2EA, all trenching, backfill, compaction, asphalt, aggregate base and all labor, materials, tools, equipment, and incidental and necessary work, complete and in place per the Water Meter Improvement Plan (D-71584), EMWD standards and City Standards and no additional payments will be allowed therefor.
A total of 8 sheets have been updated and included as part of Addendum No. 5 and shall hereby be incorporated into the Street Improvement Plans and Landscape/Irrigation Plans bid set.
A total of 9 new and separate questions and answers have been released as part of Addendum No. 5. Please refer to the Q&A section on PlanetBids, Release Questions Set 5.
The deadline for submitting pre-bid questions online via Planetbids has been extended to MONDAY, APRIL 14, 2025 AT 2:00:00 P.M.
The Bid Date and Time remains unchanged on:
THURSDAY, APRIL 17, 2025 at 2:00:00 P.M.
REVISED SHEETS: ADDENDUM NO. 5
STREET IMPROVEMENT PLAN SHEETS: 38 AND 39
LANDSCAPE AND IRRIGATION PLAN SHEETS: 2.2, 2.3, 2.4, 2.5, 2.6, 3.7
FOREVER NO BARE
ROER
BOTTOM CR
SHORING WALL
*AS BURT
CINDE NURRELA 40
DIG ALERTI! TWO WORKING DAYS BEFORE DIG TRUCTURAL EF
811.
DIVISION OF OCCUPATIONAL SAFETY AND HEALTH REVISION DESCRIPTION TRENCH / EXCAVATION PERMIT NO.
CONSTRUCTION BID SET (ADDENDUM NO. 5)
SED PLANTAINS
FULL BEARING
$3
• OUTERED BOS
LAVIN
BERMANENT SOLDIER BEAM DETAIL
CITY OF MURRIETA
CHTK MARRETANNO ALL MOSROAD
KNOT WAR
811.
RENCH / EXCAVATION PERMIT NO. REVISION DESCRIPTION
KIE UN
CONSTRUCTION BID SET (ADDENDUM NO. 5)
RIGATION BY OTHERS
O FILTRATION AREA, EMITTERS AT 15 O.C. TYP.
LOW
69+00 MATCHLINE - SEE SHEET 2.3
MURRIETA HOT SPRINGS RD
MATCHLINE - SEE SHEET 2.1
VINE CUTOUT TYP, PER DETAIL 'C ON L3,7
IRRISATION BY OTHERS
IR 203 SORSARON MATURU LEGENE
IRRIGATION NOTES
M NINIOPISE (OROHEANIC OM AIÓLRE O TANI MACURAD
19 E
REIE CUATE NEUSAECAD AST"
Scale: T= 20 NORTH
ATERA, PIPE SIRE
DRAMETER SCHEDULE 40
3/4* - iin tia CITY OF MURRIETA
LO COM
1 1/6 3.11 СРм TAS TOT THE LASOTCA DROM HIST C
14-23 GPM
24.39 GPM MURRIETA HOT SPRINGS RO WIDENING
0.59 ерм | IRRIGAIION PLAN
CITY OF MORRIETA COMMONTY SERVICES но в ліку.
CAD TOLL FREE
REVISION DESCRIPTON
CONSTRUCTION BID SET - ADDENDUM NO. 5
HANGED -NISY PAVING PERI
DETAIL 'A' L37
RANCH AR VINE POCKET
CUTOUT 3 WIDE BY I8' DEEP TYP.
MATCHLINE - SEE SHEET 2.2 MURRIETA HOT SPRINGS RD
72+00 73+00 74+00 75+00
71+00.-
MATCHLINE - SEE SHEET 2.4
CENTER LINE
Завлабая
- VINE CUTOUT TYP PER DETAI, C'ON137|
PISSARON NATTAN, TE GING CALLE DEL LAGO
IRRIGATION NOTES
088
Scole: I'e 20 NOPIN
0-5 GPM CITY OF MURRIETA
HOLD HARMLESS AND INDEMNIFICATION CLAUSE MURRIETA HOT SPRINGS RO WDENING 10-59 GPM
DONE ATION DIAN
CITY SIMURIETA CONFONIY SERVICES
DESTRICT APPROVAL Rave Are
REVISION DESCRIPTION
CONSTRUCTION BID SET - ADDENDUM NO. S
MAINUNE TO BE LOCATED WITHIN LANDSCAPE AREA
MATCHLINE - SEE SHEET 2.3 MURRIETA HOT SPRINGS RD
76+00
MATCHLINE - SEE SHEET 2.5
CENTER LINE
VIE CUTNUTTY DEO NETAL 0N137
- RON
FRIGATION BY OTHERS
IRRIGATION NOTES BURGA RON MASCAME LEGING
100/201A001483/e DeCove diete
...
VT2RR3V414348/C0-78-1313955 40.
- 13
Scole: T = 20 NORTH
CRAVETER SCHEDULE 40
15 CPM
CITY OF MURRIETA win
10-13 GPM MANUNG SPARINEN!
1.21 CPH SANS TO THE TANKAR MINOWMINT O
4-30 CPM
21/2: MURRIETA HOT SPRINOS RD WOENING
40-59 CPM
CITY OF MURRIETA COMMUNITY SERVICES
CAR TOLL FREE
31225
PARKS LANIEMANT 2PERMCNGENE SATE 03-10-2025 REVISION DESCRIPTION dine
DOMER OF GOM
CONSTRUCTION BID SET - ADDENDUM NO. 5
MAINLINE TO BE LOCATED WITHIN LANOSCAPE AREA
8OW
MURRIETA HOT SPRINGS RD
ARICATION AY OTHERE
MATCHLINE - SEE SHEET 2.6
IRRIGATION NOTES
.....
RENATION BY OTHERS
DATE STREET
REPLACE HUNTER CV. 01G-AS WITH
Scole: 1'= 20' NORTH
LATERAI FIRE SITE
DRAMETER
372-
CITY OF MURRIETA
1423 GPM
24-39 GPM VURRIETA HOT SPRINGS RO WOENNC
1-S9 GEM
IRRIGATION PLAN
CITY OF MURRIETA COMUNITY SERVICES
CASTROCT APPRONAL
Geei Manesa. 3/12Q5
224051
REVISION DESCRIPTION
CONSTRUCTION BID SET - ADDENDUM NO. 5
IRRIGATION NOTES
B/ 82 BE 80 BG EG 6
RRIGATION BY OTHERS
BIO FILTRATION AREA, EMITTERS AT 18 OC
COBBLE ROCK INLET FOR BIO ALTRATION AREA, TYP
1 1/2 POTABLE METER
88400 W: A 2 SERVCEUNE
MATCHLINE - SEE SHEET 2.5 - LIMIT OF WORK
BRIGATON MAT SEE LICENS
т.
MURRIETA HOT SPRINGS RD
LIMIT OF WORK DEL HAVEN
Scale: 1*= 20 NORTH
RAMETER SCHEDULE 40
1141 CITY OF MURRIETA vans
IC-13 GPM
CAN TOF TRE TANOSCAR FEWERT OF
MURRIETA HOT SPRINGS RD WOENING
IRRIGATION PLAN
CITY OF MURRIETA COMMUNITY SERVICES
CA TOLL TREE
ni Manens 28se"
FRA REVISION DESCRIPTION BE TEAT OK
DATO 22-15-1002 ON O C
CONSTRUCTION BID SET - ADDENDUM NO. 5
HOLD COMA MAN
CE OR BALL OF BALINO
• PLANT EPICER BULL BE DE VAR
!
KOOK OF MAN, MAX WALL, ITC
NO-OP THECK TRLEO PLANTED BED
HERETRA
IRATE BALI RECENE A FOREPLAN OF AMEND MILOH
CITY OF MURRIETA CITY OF MURRIETA CITY OF MURRIETA CITY OF MURRIETA CITY OF MURRIETA DOUBLE STAKE TREE SLD001 TREE ROOT BARRIER SLD005 sportie SLD006 27 SHRUB PLANTING Merriete VINE PLANTING SLD00B Someda GROUND COVER SLD009 5 GAL., 15 GAL, 24" BOX PLANTING
HIS MARR
EASED A MES VARY EN AGADE CONOREN
CRAVERS ADUAGENT TO ASPHALT C
HOOL A CORONET ON THE MIRCHT OF ALL BOLDT BON
IT FOR BU GROOMACHO COMPT PRESALE NE
CITY OF MURRIETA
CITY OF MURRIETA но кони CITY OF MURRIETA
1 DECOMPOSED GRANITE PATH SLD013
CONCRETE HEADER SLD010 SLD014
NOTE:
FOR ALL IRRIGATION AND PLANTING
SPECIFICATIONS, REFER TO CITY OF MURRIETA
PLANS, SPECIFICATIONS. AND CONTRACT
DOCUMENTS, MCSD BOOK FOR LANDSCAPE
IMPROVEMENTS OF MURRIETA HOT SPRINGS RO
SURE EXTENSION ADJACENT TO
DISPERSION AREA WIAMENDRO SOL
SOEWALA
SCALE 1%7
BIO-FILTRATION PLANTING AREA C VINE SIDEWALK CUTOUT
CITY OF MURRIETA
HOLO HARMLESS AND INDEMNRCATION CLAUSE PLANS IÇR THE LANOSCAPE IMPROVENENT OF
NURRIETA HOT SPRINGS RO WOENING
PLANTING DETALS
CITY OF MURRIETA COMMUNITY SERVICES
CAR TOLL FRCE
RLA NO
3A7008219332 REVSION DESCRIPTION
AS NOTEC
CONSTRUCTION BID SET - ADDENDUM NO. 5
EASTERN MUNICIPAL WATER DISTRICT
Murrieta Hot Springs Road Sewer and Water Relocations
BIDDER'S 3-YEAR EXPERIENCE RECORD &
RESUMES OF KEY PERSONNEL
All bidders must provide a detailed 3-year experience record showing successful completion, as a General Contractor (Class A and/or C-34 license), of at least Three (3) similar projects within the last 3 years on the attached form when submitting your bid.
Additionally, bidders must include resumes of key personnel proposed to work on this project when submitting your bid. This information will be critical in meeting requirements as a responsible bidder.
Failure to submit any of the above-mentioned information with your bid "may" deem your bid non-responsive
BR-1 00027 Bidder's Experience/Resumes
VALUE OF ENGINEER / OWNER /
WORK LOCATION OF CONTACT PERSON (CONTACT PERSON
YEAR TYPE/DESCRIPTION OF WORK PERFORMED WORK (CITY) Address & phone # Address & phone # 2022 $28,000,000.00 Oceanside, CA CalTrans CalTrans
Repair storm drain failure 40' below Carlos Lopez Carlos Lopez tie back surface. So, preser air, (619)991-0827 (619)991-0827 repaving of freeway and concrete work.
2024 Demo of existing utilities, installation of $800,000.00 Calexico Lilliana Falomir City of Calexico new underground utilities, new concrete (760) 768-2160 Lilliana Falomir flatwork and curb, new landscaping and (760) 768-2160
paving.
BR-2 PLEASE USE ADDITIONAL SHEETS DETAILED 3-YEAR EXPERIENCE RECORD 2024 Main Street water pipeline installation $8,522,101.40 Brawley Ana Gutierrez City of Brawley from 1st street to Eastern Ave. (760) 587-4320 (760) 587-4095 Ana Gutierrez
(760) 587-4320
2024 Pavement Rehab Various Roads $3,399,999.00 City of Imperial David Dale City of Imperial (760) 355-3336 420 S. Imperial Ave
Imperial, CA 92251
(760)355-3336
00027 Bidder' 3-year Experience
2024 Caltrans Maintenance Parking lot $350,000.00 CalTrans Jodi Nelmark CalTrans pavement (858) 472-6674 1120 N Street
Sacramento, CA 95814
Please see attached job list for the last 3 years
ROVE ENGINEERING Notes
JOB LIST - REV 2025.01.20 Contracts winoul A are the ones summited in Nicetouch Date Pronted: 4/16/2025 9 11:06 AM ACTIVE JOBS Look lor CEMASOS - Contracter Anthariation lor Using internet Extra Work Bal System D0O Contracis do nos require Nicetcuen - DO do reque Nicelouch transmission Job No :Due on customer Contract No Nice Touch Job Name Location / City BID Amount Comment 00339085
(with -)
22-049 Katherine : Windfield: Heberwood Estates Sob deing audited by Aliant. Sent remainderto Stacey of open 9054.56 inv and ret." Development She is looking into it. of open iow and Ret total ClosePending review by Carlos and Carmen Wisteria Solar
122-092 Closed Kasherine Bear Vadey Changeft Cattran toSSB (Togother 23-028 & 23-051) List in 12812- pen Resentin 15,000. ig beck one more time-open" 22026 Completed Levington La Paloma - Levington Homes Cated on 02/15/2025 ef a message @ Kye cel. Voice mar 3t office is ful/ Open" Builders Retention reminder sen: on devos should be paid saos. 22-051 Active F Dutty Katherine Dep of Water Vegetation Establishment sation ses 30.368.578.00 sil wiking Las AS307 03/1812021 was pald 1 more bilin une and Done. Bil Repair-DWR 6285 1cr April Sent-22-051 Ext. 23-027 Wll comence when 22:051 Completed 22-050 Katherine Duggins Pening res and last moice for toal o 25,28750 biled on 5/302024, Ware Completed - Carmen will follow up on Open Rettention
(22-061 AR. Pend Barbar Katherine City of El : Minor Concrete Repai: Baro wit tiow up wis R Cordova -Legel Clam Pending 141842.67 a Steve Centro
22-066 Kothenne S&B Closed Needs Change Order - Inv open 1o: 47 /70.03 (Es: 43,72461, Last bile on" Engineenne Lopce 02/28/24. Waiting tor Carlos Lopez
22-067 ¡Completed FDufty Katherine County of Behaviorat Health Parking 439,431.00 Last invoiced 12/07/2023 Retention stil pending. 19K. 123-001 Closed Carlos
Kalerce 11-43170 - Storm Damage Repar: Last irvoiced 02/29/2024 pending 58,116.68 Engineering
23-302 Carlos S&8 Satton Sea HWY 86 Last (svoiced 03/0S/2024 5745.79 stiR open.
Engineering Locations
:23-003 Closed Golindo Residence Should we close?
23-005 Completed Carlos 11-A3804 11-4318149 Caltrans San Diego Emergency Job Sink hole #11-SD. RT 905 Otay Mesa San Diego Rosa Inv 8293 05/30/24 336K Anything over bude: Xer to 23-013. GB inv wil set Required 805 CHAPO overtimit. Rosa bitting 04/16 - BRob Req Update on Outstanding inv 04/09/2024 Carios sov Heber Elementary School. Raw Water Not Sard
School
23-009 Carlos 11-A379S 605 & El Calon Biva: San Diego Work Complered Pending 04-18/2024 moice fro 12979.84 for safety Light.
Requited
23-010 Carios Carmen Buliders-Nonce Road Nanco Ro 38,00.00 Carios Rosa 11-431534 11A3810 Set Up: canos Old-use emait Retaining Wail- San Diego 11-431534 805 & Carrol San Diego Last irvoice 05/31/2026 fort 1873775.127. Rosa working on 185130 Last inv by R4 805 / Carroi Canyon
Canyon Rd Ra / Straton
23-0134 Carlos Rosa 1 11-431534 Year 2025 - 28 Additional Ramps Set Up Carlos 28 Ramps spread between 23-013 and 24-019 23-014 Closec • Vision Tratfic Trattic Control
Ciosed - Used und Vision stabished accounting and costing 23-015 Katherint s&8
52& Santo Emergency Not ivorce. Cost for Elm Ea osaling 1730.92 Closed Cartos Rosa 11-A3790 SR 78 Repair Culvert Emergency WIS E/B 11-431874 Tri-city Oceanside 30,500,000.00 Asceptance Lester and ADM pen (not signod) - BRob Reg Update on Outstandine Invoices 04/15/2024
23-020 caros 1-03.8% 12A3794 James Not Required Ramp Repair El Camino Real / College Bird 11-431894 60 RAMPS San Diego 3inv pending total 752.395.39. Pending Aprovai by Caltran-Levois04/32/24-1 Requirec more bill and dane. Needs Change Order-BRad Req Update on Outstanding Invoices 04/09/2024
23-021 Carios E Rosa Cattrans 12-2N1614 | 11A3716 Set Up Not Required 11A3716 Cuivert Repai Vanious Locations - Navajo La La Mesa San Diego: 378,040.61 SOV/ No Cost wile 22-051 is active Mesa and Dallas Street
ACTIVE JOBS Look for CEM.4905 Contractor Authorization for Using Inforner Extra Work Bul System ODO Contracts do not require Nicetouch - DO do require Nice loucn transmissioa Date Princed: 4/16/2025 @ 11:06 AM 23-022 Closed Carlos Katherine 11-A3747 1T43747 Reglace Cuivert Pipe COEC Impenal Ave - Adams Closing los Required
123-023 Caltrans 11-3A5204 11A3701 Set Up Jalal 11A3701 Pavement Repair E/B RT 94 E894 & Kelton ra - 240.234.00 SOV Sent CP Req 08/02 (Previous E 11-345204 Corrected by C. Lopez) Daabas rederal on Hamp
CANCELED F Dufty Katherine Dep of Water CANCELED 11-SO VAR VAR - Harbor - National Cry Salion Ses 14.990.370.05 22-051 Ex. 23-027 wil comenco when 22-051 Complesed Repair-DWR
23-028 Katherine S&8 Ocotillo landslide. Ocotillo Nothing bitted in this job. Old ob but voiced in April 202-Change i Caran to Engneering S&B (Together 23-028 & 23-051)
23-031 Completed Katherine : Severstrand 11-802A4 Set Up Last INDICe 06/18/2024 73670.50 Bal to finish 30696. 18/ Work Done: Bila total of Schrader
Contract to eaten e024os area Have it ready Sier stan enera 23-032 f Dulty Maverick S Dogwood 1402 Ei Cestro 3.985.800.25 12/02/2024 CCO8 18 6180.928.25 + COH20 COH20 Contract adj as 12/09/24 10 3789871.50
23-033 Carlos Katherine Caltrans 11-431754 Carlos 31-43:734 - IMP SR.111 Replace Culverts near Rutherford Ra i Brawlcy Pending Misc Labor. Sull Open in Q Required Lopez Rutherford Rood
23-034 Carlos 1 Duggins: Morning Star Apartments Water line 2760•2770 La imperial 1.650,616.50 Pending Payment from Masters con stuction $99,615.00 Cap. No pending Brucherie rd invoices. Total inv 1,344,860.93 and pond Ret 149428.84 23-035 Carlos Dupons Del Rio Club concrete siao 1 (TOGETHER 23-0958.25-036) 23-036 Carlos Duggins Duggins House- Picklecourt 2715 LA BRUCHERE imperia! (TOGETHER 23-035 4 23-038) Donation. Pending 784.00 retention, Sent reminder" 8 on06/04/2024
123-037 Completec 11-43877 Not 11-3A731 SO NB S Repair Ditch 380,000.00 Work done, Last invoice: 04/08/2024 for 25396.19 sill open. Toal expenses Encinitas
Required 138125.16
23-038 Gateway Warehouses Maggos St Cstexico 2.222.273.00 Last in 05/24 for 154807 40. 3 noices open total 202384.61 Rotention not sent Construction 154138.04/ Change Order Release
23-039 Katherine Hiltop Farms Ralph 86 Imperial
23-040 11-43830 11-3A7324 Pavement Repair NB/S Marina Dr $6.1- Hwy 86. imperist Required
23-042 ¿Not Started 11-3A7294 11A3835 losie 11-A7294 upgrade electrical Service Kearny Mesa Station! San Diego 380,000.00 Sent CP Req 05/02 - SOV - CO 23-042 8. 23-047 - Another No 11-A3877 Approva!
23-043 AR-Pend F Dutty. Existing curb removat Adams Street / Ei Centre Construction
23-044 F Dulty STREET REPAIR / OVERLAY several stice: El Centro Retention paids on 05-14-2024 CO FR 23-049 TOGETHER 23-049 & 23-044) Centro. location
COEC
23-045 Duggins: _El Centro Dog Park 7th / 6th Street
23-046 F Duffy 1
1555 W Adams El Centro 5.000.00 Open 105 in Qi win No Balig Weissker Inc
23-047 Not Started 11-3473041 11A3836 Pend 21-347304 Electric vehicle charger update Kearny Mesa Station Chula Vista 380,000.00 Sent 1CP Reg 05/02 SOV - CO 23-042 8 23-047 5705
23-049 Closed FOurty Cisy of El
Villa Manhole EI Centro CO TO 23-041 TOGETHER 23-0496 23-040) COEC
23-050 County of P No 7089M Emergeny 1ob Hillary Salton city Sation city 905304.66 / Carlos Imperial
Closed Katherine : Ocatitto landslide
Change fi Caran 05&8 Together 23-028 8 23-0527
Engneering
23-052 Katherine 8 Gap Tripton Rd Pain Springs Previously record customer was Allance Equipment
:23.055 Katherine S88 108 No Follow up with Carlos
San diego
Engsecting
ab List Rev 2025.01.20
209
ACTIVE OS
Date Printed: 4/16/2025 @ 11:06 AM
DATES
(23-057 Steven County o P No 7093M CO TO 23-057 (TOGETHER 23-057 & 23-078) Niland 2,169,579.65 Lori Sanitation sent invoice so need to reopen + CO FR 23-078 (TOGETHER 23-057/ / Carlos imperial & 23-078)
23-058 Carlos Rosa 11A3938 Set Up Cartos Not Started MILLIPITAS Bombay Beach 3 6.000.000.00 Pend Approval by Caltran- Waiting for Approval - 04/16 Rosa Double CK TA different submission
Potions.
23-062 FDuffy T City of El Emergency Water treatment plant repairs Danenberg Entro 22951.65 Last invoiced for 46959. 37 Paid on 03/1324 v57691
COEC
23-065 Carios Rosa Ace Electric Ace electric Washington park sidewalk 2261 Washington San Diego 28.250.00 IN 4/09/2024 23-064 AR-Pend F Dully County of Heffernan ave improvement from 11th•14 st 491461.76 Work Compires-ast levoice 08/24 including Retestion Change Order Approved Imperial Ca between 11th
street to 14th street.
F Outty Katherine County of 'SOV Hebertown improvement-several street location 3,264,331.001 Last rv ser 05/20202453c1X pending Retention. Last inv 12/13/2143.288.65:
Change Order
23-066 Carlos Katherine Duggins 11-34791 SB 163 at Exit ramp to 6th Ave pement rehab He 95 Neckeld Imperial 1,876,209.10 Change Orders Carlos Carmen Allance Welding Scrace
23-068 Carlos Katherine: Bornhart El Centro Police Department 150N 116S1 Ei Centro *B Call, email, sent duplicate inv 5/224. 23-070 Closed F Dutty Katherine County or Asphall Removal Evan Hewes 3810 WEvan Hones 1.750.607.70 Imperial hay
23-072 Carlos Katherine: JE Exports Addition 1812 Pan American sil Caleico Carmen wil follow up on Open AR 23-073 Ronnie. Katherine Larson Street 37 LanSe
Transp
Carlos Katherine Innercare clinic NeckelRd 1
23-076 AR-Pend Steven n00i6780 Ratibies Fior Covering Carmen to resent voice and tolow up County of CO TO 23-057 (TOGETHER 23-057 & 23-078) Niland Niland CO TO 23-057 (TOGETHER 23-057 6 23-078) Imperist
23-081 F Outly Katherine Carlos 3101 danenberg drive El Centro Last bited 0371312446939.37 23-083 Carlos Jacaranda Apartments 1625N Waterman El Centro 583,561.60 Change order F Dufly Kathenne: Main S: Watertine Installation 2023-114 8.522,101.40 (COи1 395,812.00
23-088 Road Surface improvements 2023•118 Bramley 2.653,740.00 Brawer
Carlos Katherine : Duggins Evergreen Cemetary Stade 201 E Gilet Rd El Centro 23-090 Tim" sund SOSU LAbium Campus Brawicy Will rescart around March of April 2025 Construction
20-00: Carlos Ving PO 4503025576-Viisteria Brawiey 16,500.00 24-002 Yes tomore Cartos Katherine Matan Park Wildcat Rd to Station imperial 412844.00 Missing Contract Contractor
24-003 Closed Carlos Caltrans 11-3481147 SerUP Carlos 11A3872 Repair Storm Damage San diego 330.00.00 Contract Receved 7/12 No Contract or Ret No. Going Back on 05/01/2025 24-004 001724 Cartes Caltrans 11-3A8034 1144012 Set Up. Carlos Repair Culvert s:76 san diego 390.000.00 Put al entras in this invoice-ofa livoiced Neod Contract-Pending ina/invoice Lopez
Carlos Caltrans 11-348044 Set Up Cartos Steven 380.00.00 Rosa Sert Irv 6311 04/2324 - Might have to go back pending RE Change Order:
Lopez Re assigned to Rosa work biting 04/16 - Carmen to int-approve-sent to Caltran. 3069
ACTIVE JOBS Look for CEM4905 - Contractor Autor ation for Using Internet Extra Work Bal System DOO Contracts do not require Nicetouch - DO do require Nicelouch transmssion Oate Printed: 4/16/2025 ($ 11:06 AM 24-007 Carlos CANCELER: Cattrans CANCELED 11-3A7254 OTAY POE sandiego WAITING FOR BOND COMP RELEASE Required
Katherine TWNG Genere 139.582.00 Rove is subsontractor. Pending 30% of SOV Contractor
24-011 Cartos Cry of
imperia.
24012 Closed Carlos Katherine! Duggins POTHOLE GATEWAY TEM 2-013 Completed Carlos Katherine 1 NC 2024-695 2024-695-HESD Dogwood Classroom Adition Cut off is the 20th 24-013 AND 24-031 Same Site Different Customer - 2 Construction 8
24-034 Completed F Duffy Katherine County of Imperisi County Arpor, Taxway 1099 Aurort Road 1.473.882.00 imperial
24-015 Carlos Kathetine Emmerson Remington Calexico - Aparments Calexico 724916.00 I change Crder Construction
24-016 Closed Carlos Roso Caltrans 11-34896 11-43873 11A287311-SD-805-21.810013 Parking -7181 Keamy Mesa San Deep 330.000.00 sov Nelmark Opportunity Road
24-017 FDutty Katherine County of Various Roads Rehab Salton City PHASE 1 sotton City 2.773.032.00 Imperial
EON10/24 (Ciosos Carlos Caltrans 11-348134 Set Up EA 11-34813 SD WB 76 Repar Storm Damage 400000 5/29 Not Iced because pend ng Contract. Change RE from Miser to Carto. 24000
Loper 4/24 Rosa wili star: Capturne
24-019 Carlos Catrons: 11-432524 11A3996 Set Up Carlos EFA Los Coches/Telegraph Rosd "San Diego 4,300,000.00 Rosa CEM 4905. CP Tracker Rog by Cormen 4/16 Wating Tor Approval - Stori Lopez Billing 04-16
24-0101 Not Started Carlos Cattrans 11-432524 1143986 Set Up Year 2025-28 Addional Ramps 28 Ramps spress between 23-013 and 24-019 24-020 03024 Completed Katherine City of Hernandez Park Irrigation System & Park Facities Calpatria 768.203.00 08.06.24 CO1 Reduction 348013 - 788,203.00/ Work wil starts on Thurecay Calipatris Improvement 04/18/2024
ENot Started Carlos somerse Durgins MagDO SR7 SR 7 / MaggO 255.560.50 24-022 CRS General Victoria Park Unit 3A CRS 240.924.50 Need Contract - 4/09 Ball by Carmen - Pend AP Aggregaters invoice. d Contractor
24-023 Closed Caltrans 11-34687 11A3872 Lake Henshaw Maintenance Station Santa Isabel San Dies Will Start around 07/08/2024 24-024 Not Started Caltrans 11-347954 11A3889 Set Up 11A3889 Escondido Parking tot 1780 Mission Avenue T San Diego / 236,25.00 Previously 12-34795 Nelmark Escondido
24-025 Actree Calrans 11-3A7564 11A3916 Set Up Southbound l-5 On-ramp from Gilman Or 11-34756 San Diego 23985950 CLoper requestiong RE into RosS Caltrans 11-347384 11A3928 Set Up: 11A3028 S On-Ramp From Ketter Biva San Diego 207,626.50 SOV 24-027 Carlos Rosa Caltrans 11-347484 11A3926 Set Up 38121 1143926 S Rie 5 at IB Clairemont ENTRANCE 11. San Diego 313,375.05 SOV Daadas 3A748
24-028 Carlos Caltrans 11-347904 :11A3922 SetUp Ngoc Trang SRie 5 at WLa Jolia Or Entrance Ramp from Westbound 281,251.81 11-3A790
(24-028 (Active Caltrans 11-3A7544 11A3924 Set Up Ngoc Trang 11-3A754 NB Rie163 at entrance ramp to 6üh Ave San Diego 250.69.00 pavement rehab
24-030 Carlos Cattrans: 11-3A758 11A3010 Larson Street san Diego 282,40.50 Lopez sent email Re assigned SPV Pending Ex Contract No Contract - Repeat
Jim Nelson Danny Clayton Billed ay Carmen - 24-013 AND 21-031 Same Site Different Customer 24032 Active Katherine City ot Alley improvement Project Calexico 1.087.393.00 Duplicated-Closing 24-058 Calexico
24-033 Katherine 2024-200 2024-200 Adhan Cordova Memorial Park Meadows and Clinton: 690,014.00 InvaL lo: lo: 06/18/24 Calexico
Job List Rev 2025.01.20
409
ACTIVE JOBS -cok for CEM4905 - Contractor Authorization fer Using Internet Extro Work Bill System 0D Contracts da not require Nicetouch - DO co require Nicerouch transmission Dato Printed: 4/16/2025 @ 11:06 AM $24-034 S01804 Cartos Rosa 11-348374 11A4025 Mario Orso: 11A3916 San Diego 120,000.00 As Per Carios 05/22 cost 1or Moviization AND Sinkhole @ 54 wil be charge to this job No (PREVIOUS-hey 905 & 54) Asper Carlos alt expenses for this job Mobitzation charge 24-019-1713/06-24-034 will be canceled-PENDING IF 106 Wist-BE-USEDAS-SUB-AGE-FORMODIUZATION-COSTS: EWork-Barias & Steven et Site-Od/15/2024 CANCELED.
2-035 Caltrans 11-347914 11A3923 Setup iNgoc Trang 11-34791 58 163 at Exit ramp to 6ih Ave avement rehab San Diego 461,000.00 S8 Minor - CCO#2 increated to 461000.000 24-035 i Active Carlos T 11A3981 Set Up 12-43247 Emergency Repair Storm Damage Drainage Oceanside Boulevard Oceanside 500,000.00 Peviously 218967.01 Badi System
24-037 23270 Carlos Set Up Ahmed NB -S Exit at i Ramp la National Ave and 281-13- 1-5 and National Ave 228.488.71 4008i 34802 and 28th
24-038 1 Katherine City of : 2024-01 7th 10th and 14th Street Improvement Project Imperial 5.510,912.10 Orig Bid change and C01 1280000 / sob starts May 2024 -Bid 2024-01 Bigerat
24-039 Katherine Easi Side Storm Water Dianage System provement Brown Avenue 3.396,001.00 Curren Contract 3,170.282. 00 C011- taken trom caningency / One Calipatria 2791401 plus Contingency 604600 - 3396001.00 / Owner is San Pedro Brawicy Retainage 10% on a progress invoicing
24-040 Closed Bashir Badi Requested by Danny Clayton/Mayan - is this a ADS /00? Perc Water
24-041 Closed Carlos Kathenne 381 Buders 3R1 Buikters - 604 South G Surce! in 6325 due on 05Nd Retentan taken - Dugens - Finshed Job with invase.
Requested BY Maygan
24-042 11-348434 Set Up Bashir Lori Sanitation sent invoice so need to reopen • CO FR San Diego 460,000.00 21% Mark Up -Bashir Badi RE Badi 23-078 (TOGETHER 23-057 8 23-078)
124-043 {Closed 11-348184 11A3994 Set Up -Mario Orso: Replace existing guardrail Not operative Brawiey 460.00.C0 Force MUSS /ARm 3% 24-044 Caltrans 11-3A8174| - 11A3993 Set Up Nabil ELB Irrigation Contro Replacement Route 52. 56, 15, 5 505. 460.000.00 Abdou Sian Diego (Yarious
:26.045 LB Civil 11-431824/ 11A3820 Set Up Carlos Emergency 1-8 @ Tavern Road - Re open on 2024 1007 1 Reopen on 10.07.24 as per Carlos V. Crushing Job 24-047 added to 24-045- KB billed 24-045 EWB / Olga will bill as Sub reg Bill / Coltran Job/Rove Sub to L8 Civil Job No LB2302/Pavement recycling sub to Rove/21% Mark Up 24-046 SUA Paving La Posada del Sal Apartments
24-047 (AR-Pond LB Civil 11-431824 L82302 Set Up Carlos Caltran Crushing Operation Descanso 408.36200 /11A3820 Lopec reg Check it Baling Contect /Catcan Job/Rove SubtoL8 Coilieb 24-045;
24-048 Cartos Katherine: City of Sever Manhole Manfield Homes imperiat Requested by Beau Imperial
Closed Cartos Katherine: Cottrans 11-348744 11A4004 To submit Jodie 11-2N161 S815 Son Diego 460,000.00 Invoice by ema: (old fastion as per sodi) Change Contract No By lodi Prevously 12-1 oyemailas Neimark 348374 / Mark Up 11 & 105%
24-050 1 Active Rosa Caltrans 11-3A7554 11A3913 Ahmad Pavement Reta 11-SD-5-R28 - 11-34755 Nai-S entrance ramp 347.54.00 San Diego
Haidarl from EB La Jolla
Village Dr
24-051 ¡Active 11-3A7894 11A3914 Ser up Pavement Remas 58 Rie163 Eul Ramp Park Boulevard 58 163/Romp Park San Diego 170.696.20 24-052 Active Rosa Carrans 11-347574 3A3917 Set Up Huy Leu Ne 805 / Ramp 43rd | S8 Miner B 24-053 17202: Caltrans 11-347594 11A3915 Se: Up Pavemen: Rens 58 ReSOl Ramp to EXT Cipiemon: San Diego 332,380.50! S8 Miner B Dasbas Dr. 1124000156 Ramp
24-054 Active Carlos Caltrans 11-347444 11A3921 Pavement Rehab NB or Ramp from Wh and weth National Gily - Wi and W 8th Street
24-055 Roso 1143927 Set Up Rodolfo Pavement Rehab E8 Rie 56 at exit Ramp la Rancho San Dieso 280,373.201 1124000135 Guiso Penasquitos Biva Ramp to Rancho
24-056 Closed Ola Duplicated Prol No 2021- Ally improvemen: Project - Prase Calexico 1.07.9.00 Duplicated-Keeping 24-032 Calexico Keeping 24-
032
24-057 105/1724 Closed Caltrans 21A8784 SD-154.85
Cantos SO Courty Rout 11 San Diego 460,000.00
Lopez Post Mile 1.4
24-058 Gap Rosa Catrans 11-348694 1144009 Jodie DDO Convert Tunnet Lighting to LED at Pek Orange Avo SD: 15-4.85 269.235.08 ELS Nelmark
ob List Rev 2025.01.20
sors
ACTIVE JOBS Look to: CEM4905 • Contractor Aulhoritation for Using Inscreet Extra Work Bill System DDO Contracts do not regure Nicetouch - CO do resuve Nicetouch transmission Date Printed : 4/16/2025 @ 11:06 AM GANES
24-059 05232e Actve CUNSO Central M Modular Bide 1001 Wes: Brighton Cr 4108.00 Cut off is the 20th Rove is subcontracior.
Constructior Cesena Avenue
24-080 Not Started Carlos 11-348244 r00se NUB 15 PM4.85-4.92 - Upgrade Main Elerctrical Service 10 San Diego 460,000.00 accommodate EV Charges at Escondido and Pacific
Hivy landscape Maint Station
24-061 Carlos Caltrans 11-3A7454 1143947 Set Up 13l31 Ramp Rehab NB 1-5 al Camino del Rio Son Dies® 224.605.80 Standard Agreement: S8 Minor Daabos
24-062 Cakrans 11-347584 11A3984" Set Up Ahmad Rump Reheb in San Diego-Amayo Drive leeding to SR- La Mesa San Diego 225,77.40 Sa Minor 8 Haidan 125CA947504 As Per Carlos lob changed to I-Band is 163 Connector
Active Caltrans 11-3A7604 11A3934 Set Up Huy Lu Ramg Pamnt S81-805 Exil San sidro BNd San Ysidro San Diego 292.482.00 STD 213 (Standard Contract) 24-064 Cattrans: 11-3487741 11A4032 Eric Etectrical Pole Repair, 11-3A877 Mustipie Locatons San Diego 460.000.00 Bid-ElB Force 5% / Admin 4% Weldon
24-065 Compieica i Kathenne Vision Office - Concrete El Centro 24-066 1SW1020 Not Started Caltrans 11-348784 11A4035 Pedro Road Signing and Delication 11-348784 Multiple Losations San Diego s 860,000.00% ELB Force MX U 596 - Admin 596 - AlSo 31-34378 Aguilar imperiat Location
24-067 02002 Carlos Kathenne Male Yard Miscellaneous Base - Milie Yard Mckindy-Primo Construction 26-068 Active Carlos 11-348494 1344031 Set Up EAtostati Back Plate crossues and repair pavement S0-75 18.934 Corona 480000.001 Welden / R20.142 - Alamoda
Caristian and MeCain / Orange
24-069 Active Carlos Cattrans 11-3A7614| Set Up Coid plane and overlay N81-605 Bet Romp to Paim 43(d San Diego 289,795.25 Kudupudi Street
24-070 Carlos: Needs Change Order - Inv open for 47.470.03 (Est. "Niland 16,000.00 43,724.61) Last billed on 02/28/24. Waiting for Carlos
Lopez
24-071 ¡Not Started Carlos 11A4020 Set Up Ramp Rehab frind and overlay failed pavemen:" Including Miles of 460,000.00 ELS Brett Wood Cars and and/or
Seamoria drive
24-072 Carlos Carrans 11-34883: 1244030 Set Up. [Eric Incuye Ramp Rohab and Overlay Pavement i-S Varios Locatione 460,000.00 ELB Miles of Car / E Street
24-073 Carlos Katherine: 391 Burders 2024-010 Lucky Farm-Grosing and Asphatt Manand Best Bravicy 463.10.50 Ormer san Pedro Brandy Recanage on on a proges investing POA732
28-074 CAN Carlos CANC 1243925 CA Eric Inouye 258,687.83 Mino: B Contract
CELE NC
24-075 Actre Carlos Caltrans 1343932 SEI UP Cold Plane and overlay with RHMA WB 94 at Exit Ramp to WB 94 and 32nd San Diego 219.561.85 Minor B Contract Project 1D 1124000127 Haidan D00 2a068 Street
24.076 F Duffy | Emergency Sewer system Repair at Graves /1-8 Graves and 1-8 2.340.237.56 Change order on 12.05.24 COF1 367,746.56/ Emergency PO 22500020- VPM Access for Biting Req by Dufty 07/16
24077 ACTIVE Caries Rosa Caterans 11-348874 Set Up Ramp Renab - S81-5 and Main Strect 11-SO VAR VAR CriC San Diego 469.000.00 Minor & Contract
Weldon
Harbar - Natansi Gily
24-078 F Dutty T Katherine Greenskies 2023-09-25 Spreckets Sugar Solar Keystone Rd (2023-09-25 SWPP) Brawley 172,32.00 Subcontractor- Stars tune 101% Clean Energy ..SWPP
LLO
(24-079 Road Signing and Delineatian 11-34978 El Centre Rea by Barbara. Sweeping Street. 24-080 Katherine Bid-EL8 Force 5% / Admin 4% Caliparria 24-08: (Not Started Steven Katherine : HWP Heber Heber Development - Heberwood Estate Pro ect Heber Road Heber CAl
16693
24-082 Active Katherine: City of Cole Bivd between ML King Ave and Bouker Rd Rehab - Cole Bid BTWIN ME Calexico 2.398,438.00 Calexico 5168(035): Handicap ramps and Gutters replacements King and Barker 24083 Barbar Katherine Advance
a Steve Drainage
Saplutions
Katherine City of El Southern Pump Station Project Under Union Pacific and 11,794.06.00 6702 Needs to be Notorized Centro
DraCONCS and Wake Pumps-
Job LIst Rev 2025.01.20
6019
ACTIVE JOBS Leok for CEM1905 - Contractor Authoriation for Using Internet Extra Work Bill Syslem COO Contracis do not require Nicelouch - DO co require Niceiouch transmission Oute Printed: 4/16/2025 ($11:06 AM 126-085 Caltrans 1344047 | 11-340984 SelUp Cartos Bridge Fire Repair al Chollas Creek Bridge 480,000.00 ELl Energency Force 6% admun 4% Lopez 3.32 / HVY 94 & HWY
26-086 ¿Not Started. F Dulfy Katherine City of. 2024-04 7th Street Rehab & pedestrian improvement From D to E 7th Street - Beveen imperial 275,100.86 Contingency 25% 68,775.22 Imperiat Street Dande
(24-087 200324 Active F Dufly Katherine Dep of Water 4630016179 Steven Contract 4690016070 - Various Locations adjacent to Satton Seo 8.837.231.00 Sotton Sta Restorstion Office Resorr-DWR Garcia. the Salton Sea.
24-023 0027724 Katherine Galindo 23008-S03 CM install Backup Genset-Provide earthork services La Posta - Camp Alpine Electric to fill and compact to grade Michael Monsoo
24-089 00102: Barbar: Katherine La Brucherie 10,299.15
La Brucherie Aggregaie Zirvouces for Aggregates"
a Steve
Steven T Katherine Roben Ocotillo
Kathorne City of 2024-08 Pavement Rehab Various Roads Cry of imperial 3.399.999.00 Impenal
24-092 3501904 FOuffy Kotherine City of 2024-07 AHSC-ARPA/HWY 86 Beautification Phase I Project Cly or imperial 6621467.84 Sierra Morers: Testing & inspection Project No Change from 2002 t 1202.
Imperial
24-093 Crosed Pad Build 31752 Pauma Height Valky Center Residence Rd Valley Center CA
92082
24-094 Closed Carlos 11-43154 | 1343498- Curlos Ramp Rehab 1-805 and H Street: (-80S and Street Chula Vista Minor B-L Chil Ref No No Costy - 21% Required Lopez
24-095 1 Clara Nota 550 Sanitary Sewer Ovestion
SEugerio
: 24-096L FDuffy! Katherine! City of 2024-03 Aten Road Rehab Project between Vitore and Old SR 86- Aten Road Between Insperiat 1.878.363.11 12.06.24 COA1 Sever Replacement 1,13,956.00 Sewer Repiacement Viore and Old SR85
24-097 Not Started KC Welding Shop 1549 Dogwood Rd El EtCenico 24,281.25 : Centro, CA 92243
24-098 Active Cartos Kathetine Marty Coyne Countyside Ranch -Countryside Ranch Estates Lots 1-4 Ross and Forrester ElCentro Countryside
Estates
24-099 Carlos i Katherine! L3 Parking Lot Asphair. Excovale compact and Ocolitia - 68.215.00 industrial Subgrade.
Welding inc
24-100 Closed Carlos TI:43774 2 Requirod Caltran Pavement Rehab Emergency SR7, 78, 86, 498 imperial Councy 85,000.00 ELB Sub 2194 - Our Sub PAS und Mat API - No CP Tracker Required as of losi Engintering 0529 Bridewell
(24-101 Barbara Toyotatit Aurora Stress El Centra
Dose the same day it open
24-102 Closed Carlos City of City of Imperial Emergency Water Service 621 Las Villas Street imperial Alted TO 24-038 City of imperial 7ta, 10th, 144h Stre/ Timo and Materists • Imperial
24-103 Completed carlos Katherine: Bear Valley lopschip Michaci Collar Tree Brawity - Remove Bumpers 283 Man SiC Brawley Change Order - Materia isrease Pending as Per Steve. Gapping to sibaut Dee 2nd 1 24-104 Katherine 381 Buiders 2024-002 Heritage Ranch Sorrel CT Pavement - Base and Asphalt Sorrei Ct 206.387.00 Pending Retention 24-105 Barbar 1 Equipment Rent Renting Equipment for $3500.00 No cost. a Steve
24-106 Yes assi Completed Carlos Duggins 2024.30.05 JEX industrial Park - Phase i 1812 Pan American Calexico 1119,160.00 Retention 55
Street - Track S41
Unit 6/ JEX Industria:
24.107 Yes i Park Ph. 1 Pan
;Ciased 11-3A9104| 13A4084 Se: Up Paving -Repair Washi SR 78 - PM 0.80 San Dieso Engincering NGS-SR 78 and
lefferson
28-108 Katherine: Brickhouse - Brickhouse - Dict work and potential concrete 447 WAin Ram imperial Cost Plus/ Estimate Diet work 518.000.00/ Estimate Concrete $55,000.00" Jeremy
0010: 10:X092029:0120
ACTIVE JOBS Look lar CEMASOS: Contractor Aurorization for Using Internet Extra Work Bal System DO Contracts do nos requre Nicetouch - DO co require Nicetouen transmission DarePrinced: 4/16/2025 @ 11:06AM : CATES
26-109 Not Started FOurty City of El 2023 ATP CycleS Improvements- Now ratlic signatand Imperal and Pepper "El Contro 2,848.023.001 Centro equipmen: at unlesection of imperial Ave and Pepper Dr 24-110-50 Yes thani Katherine i Ricardo National City Demo 140W 18th Street National City 107,111.11 Sean Gal stugiesin. net/Philicinc.net /PO Box Noreo, CA 92860° National City Rodriguez 91950
incardo@n
24-11-S0 Camer Katherine: City of 24-21 Capital improvements Proy 24-21" 3131 Valky Road - Nationa: Cry 283, 33.89 National City Cross street Calle 91950
Abajo
25-001 Nor Started T "Duffy Katherine Dep of Water IFB No Yranche - Various Veg Enkancemant Services. Placing Sation Sca 9.75,480.60% One year option 3277,685 Total potental = 13,036.165.00 Repais-DWR 10205038 bales, irrigation system. Establishing plants wigie maintaining and constructing ramp and access roads in
the Satton Sea
25-002 Carlos Nielsen NC 2024-703 SOSU Caleuco Campus - Grading for 2 Student Housing 2242,205.50| So Recention™ Construction: Buidings.
25-003 ¡Activel Carlos Katherine Berta Ponce Shed Padin Calico Calesco 238.227.30 25-004 ¡ActiNe F Dully Katherine Countyo: Niland Sewer Emergency Niland Emergency 10b - 1 day impenal
25-005 'F Dutty Katherine Foster Feed Foster Feed Yard Improvement - Grading and PC Cattle 3403 Casey Rd 84,000.00 Troth Skirt
¿Not Startod Camer Katherine City of Chuta DRN0221 City of Chula Vista Stope Stobilization DAN0221 CHula Vista 7.449.193.20 P00650 Visto
25-007 Active Carlos Bracy Turner Brady Turner shop lot - Materials imperial 25-008 Nor Started F Duffy Dep of Water Tutle Wash- Bid Number 10205046 Salton Ses 8.102.03.00 Under Protest 1 Year Option Oplion - Tolai Petental Petemial 11,306,847.00 Repair-DWR
25-000 Not Started Carlos Rosa 11-349174 | 1244019 Fencing repair and enhance security measures at the San Diego 480,000.00 Mark up 9N Force 9% Admin Nelmark Kearny Mesa Maintenance Station 1/12tOpp6otoniay bet, Sure 25030 ¿No: Started Carlos Rosa Catrans 11-349154 Set Up Carlos Repar brudgo Fender - Replace corroded bolts cabies Route 75- Post 2049 T Coronado 460,000.00 Mark up 740 Force /7% Admin LopeL and cables anchors assemblies with martyune stainless steel corros be resitan: bolls cables and cables acho:
assembies
25-011 50/1125 ¿Not Started Rosa 1244063 Hamid Ramp Rehab i-Sand Gilmar iS and Giman/11: 275387.50 SOV Subs it PRS Payco Vision PC Shirzay SO-5 PM A27.047
858.518.3
25012 Javier/: 'Katherine RovE Walmart parking erinding cement 210 per Hoar" Seven 1
25-01 0034% Carlos Rosa Caltrans 11432694 Set Up Cartos Bridge Repair at Old Town Viaduct - longt dinal joint RoutS Post mite San Diego
6.000000.00 Mark Up Force 496 / Amir 3%
and abutment slope regrading and slope paving 19.41
(25-014-50 Comer: Katherine SOWD • Encinitas & carail Waterine Looping Project: Mitipie Locations Encinitas i 828,893.55 1 CW2SH Moditication of District potable water system. Bellene Ave / Norfolk Corditt by the sea Installation of new piples, water meters and Dr & Cambridge Ave/! replacement of cancreter and asphalt improvements Cambriggs & Cubian. 25-015 2025 Fair - Demo DONATION imperial Valey imperial Dava Morgan Fareman Fariground
25-016 Carlos Katherine! Equipment Rental and Operator - Brawley Gas Station Branty 25-017 Katherine Vision Traffic Vision Labor - KRais Paining at Rove yard" 25-015 Carlos Toga 11-3493241 Set Up Rodolfa Culvert replacement near Crostay Truck Trand Son Diego 130.003.00 Guiao County:
Temecula
105 List Rer 2025.01.20
ACTIVE JOBS Look for CEM4905 • Contractor Authariation for Using Internet Extra Work Bill System DO Contracis do not require Nicetouch - CO do recuire Niecioush transmission Dato Printud: 4/16/2025 6P 11:05 AM (23-019 [Not Started Cartos 1 3Ri Buiders 2025-002 Palomino Court Sice improvements imperial, CA 25-020 102/1125 (Not Started Caltrans 11A10₴2 Cold Plane and overlay with S81-5 and entrance from EB La Jolla / San La Jolla Village Drive Diego
25-021 102/2003 Active Carlos City of Baythe 2025-002 A Chansiorplace sewer repsir project From Manhole 42 on l 81.219.00 Alameda Street to
Manholea 3&4 on
Manzanitas
25-022 F Dulty ! Countyor Emergoncy Scher system Repair al 3rd Street Niland 300 Third Street Niland Emergency Job -Cattrans Force AcCou (TaM) imperial
23-023 Not Started T Carlos Niesen 2025-717 CUHS SHS Aquatic Center Phase 1 - Demolition Grading 351 Ross Ave El Centro 479.23.00 SOC - 5% Retention Construction and Site Uristies
i0b List Rev 2025.01.20
ROVE
ENGINEERING
8291 Aero Place Ste 100 San Diego, CA 92123 || (858) 384-6285 || License (A) 1046101 Additional Trade / Project References:
Cal Trans
Carlos Lopez
Engineering Supervisor 619-991-0827 [email protected] Project Title - CA78 Storm Drain Emergency
Project Location - Oceanside, CA
Work Performed (as Prime) - Heavy highway civil
Contract Amount - $30,500,000.00
Scheduled Completion Date - March 29, 2023
Completion Date - March 29, 2023
Cal Trans
Carlos Lopez
Engineering Supervisor 619-991-0827 [email protected] Project Title - Ramp Repair Pavement
Project Location - San Diego, CA
Work Performed (as Prime) - Freeway paving
Contract Amount - $12,471,968.75
Scheduled Completion Date - April 12, 2023
Completion Date - April 3, 2023
Imperial County Public Works
Cesia Bautista
Civil Engineer 760-604-5012 [email protected] Project Title - Airport Pavement Rehab
Project Location - Imperial County
Work Performed (as Prime) - Asphalt paving
Contract Amount - $1,449,674.00
Scheduled Completion Date - December 31, 2021
Completion Date - December 31, 2021
County of Imperial
Cesia Bautista
Civil Engineer760-604-5012 [email protected] Project Title - Clark Road Improvements
Proiect Location - Imperial County
Work Performed (as Prime) - Street improvements
ROVE
ENGINEERING
8291 Aero Place Ste 100 San Diego, CA 92123 || (858) 384-6285 || License (A) 1046101 Contract Amount - $1,541,850.00
Scheduled Completion Date - January 31, 2022
Completion Date - January 31, 2022
City of Imperial
Vesus Villegas
City Engineer760-604-3251 [email protected]
Project Title - La Brucherie Ave Road Widening
Project Location - Imperial, CA
Work Performed (as Prime) - Street Improvements
Contract Amount - $2,485,325.00
Scheduled Completion Date - November 30, 2022
Completion Date - November 30, 2022
City of Brawley
Ana Gutierrez
Public Works Analyst 760-587-4320 [email protected] Project Title - Legion Street Improvements
Project Location - Brawley, CA
Work Performed (as Prime) - Street Improvements
Contract Amount - $1,040,591.00
Scheduled Completion Date - April 19, 2023
Completion Date - April 19, 2023
City of Brawley
Ana Gutierrez
Public Works Analyst 760-587-4320 [email protected] Project Title - Western Ave Street Improvements
Project Location - Imperial, CA
Work Performed (as Prime) - Street Improvements
Contract Amount - $2,094,911.00
Scheduled Completion Date - June 30, 2023
Completion Date - June 30, 2023
BIDDER'S RESUMES
(ATTACH HERE
00027 Bidder's Experience/Resumes
Jay Grady
Phone: (619) 743-7411
Email: [email protected]
Summary/Objective
Accomplished Foreman, General Superintendent, and Heavy Equipment Operator with 29 years of experience in overseeing construction projects, managing teams, and operating a wide range of heavy machinery. Expertise in wet utilities, general construction, and heavy equipment operations, including Excavators, Dozers, Blades, Skidsteers, Dump Trucks, Water Trucks, Loaders, Skip Loaders, and Track Loaders. Proven success in delivering projects on time, within budget, and in compliance with all safety standards. Seeking to apply my leadership skills and hands-on experience to a senior management role in construction or project oversight.
Skills
• Heavy Equipment Operation: Excavators, Dozers, Blades, Skidsteers, Dump Trucks, Water Trucks, Loaders, Skip Loaders, Track Loaders
• Team Leadership & Supervision
• Project Management & Scheduling
• Wet Utility Installation: Water Lines, Sewer Systems, Storm Drains • Safety Compliance & Hazard Prevention
• Blueprint Reading & Site Coordination
• Equipment Maintenance & Troubleshooting
• Budgeting & Resource Allocation
• Problem-solving & Conflict Resolution
• Effective Communication & Reporting
• Staff Training & Development
Work Experience
Superintendent / Heavy Equipment Operator
Rove Engineering - 2025 - Current
• Supervised and managed wet utility projects, including the installation of water lines, sewer systems, and storm drains, utilizing over 29 years of heavy equipment operation experience.
Led teams in operating Excavators, Dozers, Blades, Skidsteers, Dump Trucks, Water Trucks, Loaders, Skip Loaders, and Track Loaders, ensuring high standards of safety and efficiency.
• Coordinated and managed resources for timely completion of construction and wet utility projects, consistently meeting deadlines and staying within budget. • Ensured all work was compliant with safety protocols, conducting regular site inspections and training operators on safe equipment operation.
Superintendent / Heavy Equipment Operator
GPS Plumbing - 2020 - 2024
• Supervised and managed wet utility projects, including the installation of water lines, sewer systems, and storm drains, utilizing over 29 years of heavy equipment operation experience.
• Led teams in operating Excavators, Dozers, Blades, Skidsteers, Dump Trucks, Water Trucks, Loaders, Skip Loaders, and Track Loaders, ensuring high standards of safety and efficiency.
• Coordinated and managed resources for timely completion of construction and wet utility projects, consistently meeting deadlines and staying within budget. • Ensured all work was compliant with safety protocols, conducting regular site inspections and training operators on safe equipment operation.
• Collaborated with engineers, contractors, and project managers to review plans and ensure the accurate installation of systems and utilities. • Managed routine maintenance, troubleshooting, and repairs of equipment, reducing downtime and keeping projects on track.
• Actively mentored and trained new operators and staff, sharing expertise and ensuring adherence to industry best practices.
General Superintendent / Heavy Equipment Operator
Nicholas Construction Services - 2005 - 2020
• Directed and managed large-scale construction projects, specializing in wet utilities, ensuring smooth operations and timely project completion. • Supervised and coordinated teams of equipment operators, ensuring the safe and efficient use of machinery including Excavators, Dozers, Blades, Skidsteers, and other heavy equipment on various construction sites.
• Managed daily operations, resource allocation, and scheduling to ensure projects met deadlines and remained within budget.
• Worked closely with engineers, project managers, and contractors to ensure specifications and safety standards were adhered to throughout project lifecycles. • Conducted site safety inspections, led training sessions, and enforced safety protocols, reducing workplace accidents and ensuring compliance with OSHA standards. • Handled the routine maintenance and repair of heavy equipment, minimizing downtime and maximizing project efficiency.
• Acted as the primary liaison between clients, management, and field crews, ensuring effective communication and client satisfaction.
TIM MOUNTNEY
OPERATIONS MANAGER
CONTACT PROFILE
760-815-8827 With over 24 years of work experience in heavy civil [email protected] construction, I am the third generation of Civil Constructors in my family with experience ranging from large tract
projects, water and sewer treatment facilities, roadways, heavy Civil Infrastructure, and commercial tilt ups. I am detail oriented, logical, precise and take pride in my work. I am versed in 3D modeling and possess extensive
knowledge of Civil Planning and Design. I have 16 years' experience with AG-Tek modeling, and 12 years'
experience with Topcon and Trimble GPS systems.
SKILLS EXPERIENCE
Heavy Equipment Operations Manager -
Grading Rove Engineering
Underground Utilities Current
Crew Management Heavy Equipment Operator & GPS Technician. Project Job Site Maintenance management and overall operations manager for our San Safety Protocols Diego Division.
GPS software
Ag-Tek Software Estimator / Project Manager -
3D Modeling Dick Miller Inc.
2018-2023
Project Estimator and Project Manager. Successful project estimating and awarded jobs. Working directly with
Subcontractors and Vendors to produce on-time
completion of jobs.
EDUCATION
OSHA Training Superintendent / GPS Tech / Modeling -
CPR Certified JMI Equipment
2013-2018
Palomar College / SDSU GPS for Earthwork and 3D modeling for accurate quantity courses take-offs. Overseeing projects to completion
Calculus 1-3
Statistics Project Manager -
Architecture TNT Blanchard General Engineering
Chemistry 2009-2013
Spanish Estimating projects. 3D modeling and GPS Technician And more...
Grade Checker -
The Pahla Corporation
2001-2009
Grade Checker for earthwork and grading. Heavy
equipment operator and GPS technician
PROJECTS COMPLETED
• Approximately 10,000 Tract Home Projects from
$100k-$4mil
• Sempra Energy Power Plant in Escondido $100mil
• Palomar College North Campus $17mil
• MCX Camp Pendelton $72mil
• BEQ8 Camp Pendelton $105mil
• BEQ7 San Clemente Island S95mil
• San Clemente Island Water Treatment Facility $8Mil
• Temecula Valley Regional Water Treatment Facility
$17mil
• Palomar Forum in Carlsbad $15 mil
• Yuma, Arizona Water Treatment Plant $17 mil
Lameron vibbert
619.507.3749
[email protected]
Mr. Cameron Vibbert
Operations Manager
Education/Professional Registrations/Certifications:
• BS Degree in Construction Management, Boise State University - Boise, ID • Certified Professional Constructor, American Institute of Constructors (AIC) i OSHA - 30-hour Safety Training for the Construction Industry • MSHA - Part 46 New Miner Training and Certification
• OSHA - HAZWOPER Training and Certification
• WPCM - 8 hr Caltrans Water Pollution Control Manager Training • US FAA Remote Pilot Certification, Small Unmanned Aircraft System • First Aid and CPR Trained
Summary of Qualifications:
Mr. Vibbert has worked extensively on heavy civil infrastructure construction projects valued from $1 million to $145 million in the bid-build and design-bid-build market sectors with different owners and agencies in various geographic areas. Projects have varied in scope from mass grading and earth moving projects, pavement rehabilitation projects, and structural concrete bridge construction to solid waste and wastewater facility construction, new mine expansion, and environmental remediation projects.
Scopes include, but are not limited to demolition, SWPPP planning and implementation, underground utilities, electrical systems and components, structural concrete for both foundations and bridges, excavations and grading, drainage systems, and paving of both hot mix asphalt and concrete.
Software Skills: Procore, Plan Grid, HCSS Heavy Job, Primavera P6, MS Office Suite, Bluebeam, Adobe Acrobat, Trimble Business Center, AutoCAD, Propeller Aerial Drone Topographic Survey Job Skills: Project Estimating, Planning and Management, Scheduling, Site Supervision, Quality Control, Site Safety and Health Tasks, coordination with clients, designers, and sub-contractors For the following projects, Mr. Vibbert has held numerous roles and has been responsible for project scheduling, design coordination, owner relations, worked with project stakeholders to identify critical elements of work, issues or problems, and collaborated with those stakeholders to develop a solution, cost/revenue billing/reporting/projections, CPM development and updates, change order (submission and review), dispute resolution process, field/crew/subcontractor coordination, detailing mechanical systems, tracking job quantities, performing equipment and (water recycling plant) system startups, document control, GPS surveying and submittal reviews. For several General Contractors he was involved in contract review and development, constructability reviews, monitored and evaluated Subcontractors' use of sound construction practices and adherence to plans, contract and specifications, monitored construction progress including the CPM schedule to identify possible quality, cost and schedule related problems, and recommend preventative actions to ensure critical milestones and stakeholder expectations were met.
Cameron vibbert
619.507.3749
[email protected]
Work Experience:
Below is a list of Companies Mr. Vibbert has worked for:
Years Company Name Title(s)
2022 - 2024 Silverstrand Construction Inc. - San Diego CA Operations Manager Project Manager
2021 - 2022 SEMA Construction - San Diego, CA Project Manager 2018 - 2021 Rebath of Southern California - San Diego, CA Project Manager 2014 - 2018 Flatiron Construction Corp. - San Diego, CA Project Manager 2012 - 2014 Haley & Aldrich Inc. - San Diego, CA Construction Manager 2011 - 2012 Tera Nova Technologies - San Diego, CA Project Manager QC Manager
2006 - 2011 Goodfellow Brothers, Inc. - Maui, HI Project Manager Project Engineer
Cost Engineer
Below is a list of completed projects:
Contract Year
Projects Title / Location Government Agency
Amount Completed
State Highway in San Diego County Near San Caltrans, District 11 $30M 2024 Diego at 1.9 Miles East of Sanyo Ave.
Role in this Project Project Manager
Brief Scope of Work
Construct drainage facilities, retaining wall and earthwork. Work to be completed included the following work categories: Clearing and grubbing, Earthwork (Mass Grading, Import Borrow), Trench excavation, Rough grading, Subgrade, Subbase, Base, Curb and gutter, Cold planing/milling existing pavement, Paving, Compaction, Retaining Wall Construction (12'H X 700' L), Concrete Barrier, Storm Drains/Culverts, Finishing Roadway State Highway in Imperial County in Calexico Caltrans, District 11 $7.2M 2024 From Ollie Ave. to 0.1 Miles East of
Rockwood Ave.
Role in this Project Project Manager
Brief Scope of Work
DA Ramps, Reinforced concrete pipe (RCP), Drainage Inlets, Cold planning or milling existing pavement, Aspha aving, Finishing roadwav, Pavement Markers and Traffic Striping Signal and Traffic lighting svstems, Roadw Laminated Signs
Cameron Vippert
619.507.3749
[email protected]
Project Experience (Continued):
Contract Year
Projects Title Government Agency
Amount Completed
San Marcos Creek Infrastructure Project City of San Marcos $61M 2024 Role in this Project Project Manager
Brief Scope of Work
Adding needed infrastructure to relieve long-standing flooding issues, preserve creek habitat and improve local transportation. Extensive drainage improvements to minimize flooding risks, construction of two (2) new bridges at Via Vera Cruz and Bent Avenue, add sidewalks and bike lanes, preserve, and enhance 1.5 miles of creek habitat, and build a new neighborhood park and surrounding trail.
Route 5 & Genesee Ave. Overcrossing Caltrans, District 11 $61M 2018 Role in this Project Project Manager
Brief Scope of Work
Replace existing six lane overcrossing with a ten-lane structure, widen freeway access ramps, add lanes, and construct a new, separated bicycle/pedestrian path. Integral to the project is the construction of technically challenging retaining walls including four soil nail, one ground anchor, and two GRE walls.
Route 11/125/905 Separation Caltrans, District 11 $12M 2017 Role in this Project Project Manager
Brief Scope of Work
Responsible for all aspects of construction of the overcrossing bridge, drainage, and new roadway connectors. Self- performed over 5500 CY of jointed plain concrete paving and engineered and executed a valued engineere savings to the State of California worth $45K and completed the project on schedule and ahead of budget Solomon Iron Ore Mine Improvements, Fortesque Metals Group $145M 2012 Pilbara Australia (FMG)
Role in this Project Project Manager / QC Manager
Brief Scope of Work
Manager responsible for civil construction activities on a large conveyance system installation including the review and approval of over 800 pages of concrete drawings and details, construction oversight for civil subcontractor performing excavation and grading. Concrete inspector for over 12,000 m3 of concrete pours over nine months of production.
Kaheawa Wind Project - Phase II First Wind $4M 2011
Role in this Project Project Manager
Brief Scope of Work
Heavy Civil services, mass excavation, grading, and embankment of 14 new turbines on rugged terrain.
Implementation of measures such as mobile crushing, drilling, and blasting, and extreme hauls in challenging terrain. Utilization of new methods for erosion and sediment control in archeological and environmentally sensitive conservation areas.
Cameron vibbert
619.507.3749
[email protected]
Project Experience (Continued):
Contract Year
Projects Title Government Agency
Amount Completed
Central Maui Landfill Phase V-B Maui County Dept. of Solid $2.3M 2010 Waste
Role in this Project Project Manager
Brief Scope of Work
Direct all aspects of project and resource management during 30K CY of structural embankment and 288K SF of geo-membrane install, accelerating project schedule achieving a 32-day early finish. Devise and provide value engineering savings of over $180K for the client.
Wailuku / Kahului WWRF Tsunami Maui County WWRD $1.3M 2011 Protection Project
Role in this Project Project Manager
Brief Scope of Work
Coordinate four different trades to eliminate inherent risk involved in project that included sand subgrade dewatering, support and rehabilitation of failing structural concrete, and design and implementation of a full system bypass of the treatment process. Fulfillment of all strict DOH, EPA, and ARRA requirements on this federally funded stimulus project.
Hansen Road Realignment Maui County Public Works $1.5M 2010 Role in this Project Project Manager
Brief Scope of Work
Facilitate County procurement of new right of way from local cane producer by providing major site upgrades to agricultural utilities and infrastructure. Expedite construction with County DOT and local agriculture producer.
Successful execution of 5K CY embankment during an eight-hour traffic closure and tie-in for road opening.
Central Maui Landfill Phase V-A and Maui County Dept. of Solid $7.3M 2010 Related Improvements Waste
Role in this Project Project Engineer
Brief Scope of Work
Redevelopment of project plan and schedule due to site restraints. Price and negotiate all change orders, establishing a strong client relationship and an atmosphere of client trust. Management of foreman and crew of 12 operators/laborers during 80K CY of earth moving and 560K SF of geomembrane deployment. Development of progressive methods of placing 80K CY of structural embankment maximizing budget savings and minimizing a massive material shortage.
Cameron vibbert
619.507.3749
[email protected]
Project Experience (Continued):
Contract Year
Projects Title Government Agency
Amount Completed
The Ritz Carleton Club & Residences at Ritz Carleton $33M 2009 Kapalua Bay
Role in this Project Project Engineer / Cost Engineer
Brief Scope of Work
Prepare and maintain project budgets, project cost controls, subcontractor and owner pay estimates, and contract document controls. Perform routine quality control inspections, safety, and company policy compliance checks.
Compile quantity tracking of over 250K CY of GPS guided structural footing excavation and 179K CY of material export. Maintain owner satisfaction and good neighbor relations in a highly sensitive ocean resort setting during 2 yrs. of heavy construction.
DAN HILDEBRAND
FOREMAN & HEAVY EQUIPMENT OPERATOR
CONTACT PROFILE
760-809-9411 Heavy Equipment Operator with extensive experience, [email protected] recognized for optimizing project schedules and enhancing team efficiency. Skilled in grading and site inspections, I excel in managing materials and ensuring safety protocols, consistently delivering projects on time while fostering effective communication and collaboration among crew
members. Solid understanding of operating machinery and reading blueprints, paired with hands-on skills in equipment maintenance and troubleshooting. Dedicated to achieving operational efficiency and maintaining high safety
standards. Experienced with operating heavy machinery in construction settings. Utilizes efficient techniques for machinery control and site safety. Track record of effective teamwork and punctual project completion. Experienced
leader with strong background in guiding teams, managing complex projects, and achieving strategic objectives. Excels in developing efficient processes, ensuring high standards, and aligning efforts with organizational goals
SKILLS EXPERIENCE
Heavy Equipment Foreman-
Grading Rove Engineering
Underground Utilities Current
Crew Management Ensured timely completion of projects with effective time Job Site Maintenance management and prioritization of tasks.
Safety Protocols Mitigated risk, identifying potential issues early and developing contingency plans. Optimized equipment
usage, scheduling regular maintenance and updates to
prevent downtime. Reviewed design specifications critically for accuracy, identifying potential issues before they
EDUCATION
escalated into costly delays or rework situations.
OSHA Training Collaborated with architects, engineers, and contractors to CPR Certified achieve seamless project execution. Maintained clean, safe worksite for team safety and to help keep projects Foreman -
Silverstand Construction
Trained new employees to learn new systems, apply best
practices and comply with protocols and regulations.
Maintained a safe working environment through adherence to safety protocols and regular site inspections.
Ensured timely completion of projects with effective time management and prioritization of tasks.
Checked equipment to determine if maintenance was
required
Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
Collaborated with project managers in planning stages,
advising on schedule adjustments and potential obstacles.
Achieved recognition for outstanding project management, delivering projects that consistently met all time, budget, and quality targets.
Trained workers in proper methods, equipment operation
and safety procedures.
Heavy Equipment Operator/Foreman -
American Pride General Engineering
Adapted quickly to changing project requirements or
unexpected obstacles encountered during the course of
work assignments.
Demonstrated versatility in skillset by operating multiple types of heavy machinery to accommodate project needs.
Ensured timely project completion with efficient execution of excavation, grading, and site preparation tasks.
Played a key role in successful project completions by
maintaining open lines of communication with supervisors and team members, ensuring timely adjustments to work
strategies when needed.
Maintained accurate logs of equipment operation hours,
maintenance activities, and project progress for streamlined record-keeping purposes.
Upheld company reputation for quality workmanship
through precise execution of tasks according to blueprints and specifications
APRIL REID
PROJECT ENGINEER
CONTACT PROFILE
760-670-6193 Dedicated and communicative Project Engineer with over nine years' experience in commercial and residential
[email protected]
PO BOX 572 construction. Passionate about achieving project Valley Center, CA 92082 excellence and committed to growth.
SKILLS EXPERIENCE
Project Management Project Engineer
Software 2024-CURRENT
AutoCad ROVE ENGINEERING, Inc
Revit Project planning, scheduling, resource allocation. RFP's and Bluebeam proposals. Managing project documentation and ensuring compliance. Collaborate with subcontractors and suppliers Communication
Creativity to ensure smooth project execution and timely delivery.
Strategic thinking
Drafter & Permit Processor
2021-2024
EDUCATION
J. VILLA AND COMPANY, INC
Palomar College Drafted detailed architectural plans for custom homes, San Marcos, CA including floor plans, site plans, elevations, electrical, & perspective 3D models using Revit software. Permit
CERTIFICATES Processing with different City's and County's - from permit applications, pre-reviews, addressed issued comments, and CalAPA - Training permit issuance process. Efficient in Public Notice packages Asphalt Pavement 101 and Administrative Permits. Knowledge and implementation Asphalt Forensics of Building Codes and regulations.
Office Manager / Project Assistant
2016-2019
J& J Drywall
Report preparation, report management, and inventory
management. Support in business operations, ensuring
adherence to all policies and procedures. Assisted in
accounts receivable and payroll management, generating
detailed reports, and presenting results to management.
Organized a team for Habitat for Humanity Woman's Build community events.
ROVE
ENGINEERING
8291 Aero Place Ste 100 San Diego, CA 92123 || (858) 384-6285 || License (A) 1046101 Key Personnel Experience / Resume
Cameron Vibbert
(619) 507-3749
Project Manager
BA in Construction Management
15 years experience in Project Management
Tim Mountney
(760) 815-8827
Project Manager / Superintendent / Operator
20+ years in-the-field construction experience
April Reid
(760 )996-1288
Project Engineer / Project Assistant
5 years of Project Engineering Experience
10 years of Project Assistant Experience
Dan Hildebrand
(760) 809-9411
Project Foreman
20+ years of in-the-field construction experience
Jay Grady
(619) 743-7411
Superintendent / Foreman
25+ years of in-the-field construction experience and underground work Juan Higugra
Foreman / Operator
10+ years of foreman and in-the-field construction experience *Additional information available upon request
ROVE
ENGINEERING
8291 Aero Place Ste 100 San Diego, CA 92123 || (858) 384-6285 || License (A) 1046101 Underground/Paving/Traffic Control Installation Personnel:
Dan Hilderbrand - Superintendent
Beau Carson - Utility Foreman
Luis Castro - Operator/Labor
Nate Seals - Labor/Flagger
Levi Preece - Labor/Flagger
George Williams - Operator
Javier Morales - Pipelayer
Drake Miller - Labor Operator
Cody Hatfield - Pipelayer
Ted Vogel - Underground Foreman
Austin Vogel - Pipelayer
Bobby Ellis - Paving Foreman
Edgar Mendez - Operator
Ismael Ramirez - Operator
Blake Russel - Operator
McKenzie Maxwell - Operator
Jesus Viveros - Operator
Diego Morales - Labor
Jose Gomez - Operator
Javier Oceguera - Teamster Truck Driver
Francisco Flores - Teamster Truck Driver
Alonzo Esquivel - Teamster Truck Driver
Carlos Villarino - Traffic Control Supervisor
Brock Russell - Flagger
Jay Grady - Superintendent
Luis Herrera - Foreman
Nicolas Hogue - Operator
Juan Higugra - Foreman
Jonathan Vavela - Operator
Bond No.: N/A
•ALA Document A310™ - 2010
Bid Bond
CONTRACTOR: SURETY:
(Name, legal status and address) (Name, legal status and principal place of business)
ROVE ENGINEERING, INC.
P.O. BOX 2108 EVELOPERS SURETY & INDEMNITY This document has important leg COMPANY and HARCO NATIONAL onsequences. Consultation wit EL CENTRO, CA 92243 an attorney is encouraged witl
INSURANCE COMPANY
espect to its completion o
modification.
800 SUPERIOR AVENUE E., 2IST
OWNER: Any singular reference to
FLOOR, CLEVELAND, OH 44114
(Name, legal status and address) Other party far be considered CITY OF MURRIETA 4200 SIX FORKS ROAD, SUITE 1400,
plural where applicable.
I TOWN SQUARE, RALEIGH, NC 27609
MURRIETA, CA 92562
BOND AMOUNT: TEN PERCENT OF TOTAL AMOUNT BID (10% OF TOTAL BID AMOUNT) PROJECT: (Name, location or address, and Project number, if any) MURRIETA HOT SPRINGS ROAD WIDENING PROJECT - CITY PROJECT NO. #10-340 CIP NO. 8079 The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material fumnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for are to see bernd Contral obtain the Surety's consent for an extension beyond sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. 2222
common law bond.
Signed and sealed this day of FEBRUARY, 2028
ROVE ENGINEERING, INC.
(Principal (Seal)
(Witness) esiden
(Title) DEVELOPERS SURETY & INDEMNITY COMPANY
and HARCO NATIONAL INSURANCE COMPANY
(Surety) SEAL SEAL
(Witness)
BART STEWART, ATTORNEY-IN-FACT
(Title)
CAUTION: You should sign an original AlA Contract Document, on which this text appears in RED. An original assures that Init.
POWER OF ATTORNEY FOR
COREPOINTE INSURANCE COMPANY
DEVELOPERS SURETY AND INDEMNITY COMPANY
54 Maiden Lane, 43rd Floor, New York, NY 10038
(212) 220-7120
KNOW ALL BY THESE PRESENTS that, except as expressly limited herein, COREPOINTE INSURANCE COMPANY and DEVELOPERS SURETY AND INDEMNITY COMPANY, do hereby make, constitute and appoint:
Bart Stewart ., of Encinitas, CA
as its true and lawful Attomey-in-Fact, to make, execute, deliver and acknowledge, for and on behalf of said companies, as sureties. bonds. undertakings and contracts of suretyship giving and granting unto said Altomey-in-Fact full power and authority to do and to perform every act necessary, requisite or proper to be done in connection therewith as each of said company could do, but reserving to each of said company full power of substitution and revocation, and all of the acts of said Allomey-in-Fact, pursuant to these presents, are hereby ratified and confirmed. This Power of Attorney is effective and shall expire on December 31, 2025.
This Power of Attorney is granted and is signed under and by authority of the following resolutions adopted by the Board of Directors of COREPOINTE INSURANCE COMPANY and DEVELOPERS SURETY AND INDEMNITY COMPANY (collectively, "Company") on February 10. 2023 RESOLVED, that Sam Zaza, President, Surety Underwriting, James Bell, Vice President, Surely Underwriting, and Craig Dawson, Executive Undenvriter:
Surely, each an employee of Am Trust North America, Inc., an affiliate of the Company (the "Authorized Signors"), are hereby authorized to execute a Power of Attorney. qualifying allorneys)-in-fact named in the Power of Attorney to execute, on behalf of the Company, bonds, undertakings and contracts of suretyship. or other suretyship obligations; and that the Secretary or any Assistant Secretary of the Company be, and each of them hereby is, authorized to attest the execution of any such Power of Attorney.
RESOLVED, that the signature of any one of the Authorized Signors and the Secrelary or any Assistant Secretary of the Company, and the seal ol' the Company must be affixed to any such Power of Attorney, and any such signature or seal may be affixed by facsimile, and such Power of Attomey shall be valid and binding upon the Company when so affixed and in the future with respect to any bond, undertaking or contract of suretyship to which it is attached IN WITNESS WHEREOF, COREPOINTE INSURANCE COMPANY and DEVELOPERS SURETY AND INDEMNITY COMPANY have caused these presents to be signed by the Authorized Signor and altested by their Secretary or Assistant Secretary this March 27.2023 AND
Santo INSURANC
By:
RPORA ORPORA
Printed Nai C
Title: President, Surety Underwriting & SEAL 1936
WARE /FORT
ACKNOWLEDGEMENT:
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF California COUNTY OF Orange
March, 2023 before me. Hoang-Quen Phu Pham - personally appeared Sam Zaza who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to within the instrument and acknowledged to me that they executed the same in their authorized capacity, and that by the signature on the instrument the entities upon behalf which the person acted. executed this instrument.
I certify, under penalty of perjury, under the laws of the State of Calitornia that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
SAL ORT HOANG-QUYEN P. PHAM
Notary Public - California
Orange County
Commission # 2432970
My Comm. Expires Dec 31, 2026
CORPORATE CERTIFICATION
he undersigned. the Secretary or Assistant Secretary of COREPOINTE INSURANCE COMPANY and DEVELOPERS SURETY AND INDEMNIT OMPANY, does hereby certily that the provisions of the resolutions of the respective Boards of Directors of said corporations set forth in this Power of Altorne are in force as of the date of this Certification.
This Certification is executed in the City of Cleveland. Ohio, this March 19, 2023.
DocuSigned by:
By: Barry W. Moses Barry W. Moses. Assistant Secretary POA No. N/A GB6415E7ADE548C...
DocuSignEnvelopeID:3352BFD6-5E9D-4796-837E-C1E455E6530F Ed. 0323 Signed and sealed this 6th day of February 2025
POWER OF ATTORNEY Bond # N/A
HARCO NATIONAL INSURANCE COMPANY
INTERNATIONAL FIDELITY INSURANCE COMPANY
Member companies of IAT Insurance Group, Headquartered: 4200 Six Forks Rd, Suite 1400, Raleigh, NC 27609 KNOW ALL MEN BY THESE PRESENTS: That HARCO NATIONAL INSURANCE COMPANY, a corporation organized and existing under the laws of he State of Illinois, and INTERNATIONAL FIDELITY INSURANCE COMPANY, a corporation organized and existing under the laws of the State of Nev lersey, and having their principal offices located respectively in the cities of Rolling Meadows, illinois and Newark, New Jersey, do hereby constitute and
BART STEWART
been duly executed and acknowledged by their regulary elected officers at their principal offices.
This Power of Attorney is executed, and may be revoked, pursuant to and by authority of the By-Laws of HARCO NATIONAL INSURANCE COMPANY and INTERNATIONAL FIDELITY INSURANCE COMPANY and is granted under and by authority of the following resolution adopted by the Board of Directors of INTERNATIONAL FIDELITY INSURANCE COMPANY at a meeting duly held on the 13th day of December, 2018 and by the Board of Directors of HARCO NATIONAL INSURANCE COMPANY at a meeting held on the 13th day of December, 2018. "RESOLVED, that (1) the Chief Executive Officer, President, Executive Vice President, Senior Vice President, Vice President, or Secretary of the Corporation shall have the power to appoint, and to revoke the appointments of, Attorneys-in-Fact or agents with power and authority as defined or limited in their respective powers of attorney, and to execute on behalf of the Corporation and affix the Corporation's seal thereto, bonds, undertakings, recognizances, contracts of indemnity and other written obligations in the nature thereof or related thereto; and (2) any such Officers of the Corporation may appoint and revoke the appointments of joint-control custodians, agents for acceptance of process, and Attorneys-in-fact with authority to execute waivers and consents on behalf of the Corporation; and (3) the signature of any such Officer of the Corporation and the Corporation's seal may be affixed by facsimile to any power of attorney or certification given for the execution of any bond, undertaking, recognizance, contract of indemnity or other written obligation in the nature thereof or related thereto, such signature and seals when so used whether heretofore or hereafter, being hereby adopted by the Corporation as the original signature of such officer and the original seal of the Corporation, to be valid and binding upon the Corporation with the same force and effect as though manually affixed."
IN WITNESS WHEREOF, HARCO NATIONAL INSURANCE COMPANY and INTERNATIONAL FIDELITY INSURANCE COMPANY have each executed and attested these presents on this 31st day of December, 2024
AL INSU
STATE OF NEW JERSEY STATE OF ILLINOIS CORPORATE
CORPOR County of Essex County of Cook
SEAL SEAL
1904 1984
SLINOIS.
JERS
Kenneth Chapman
Executive Vice President, Harco National Insurance Company and International Fidelity Insurance Company
On this 31st day of December, 2024 , before me came the individual who executed the preceding instrument, to me personally known, and, being by me duly sworn, said he is the therein described and authorized officer of HARCO NATIONAL INSURANCE COMPANY and INTERNATIONAL FIDELITY INSURANCE COMPANY; that the seals affixed to said instrument are the Corporate Seals of said Companies; that the said Corporate Seals and his signature were duly affixed by order of the Boards of Directors of said Companies.
IN TESTIMONY WHEREOF, I have hereunto set my hand affixed my Official Seal, at the City of Newark, New Jersey the day and year first above written.
JOTARY
PUBLIC Shucke Q. Outey
: 500799
NEW JERSE Shirelle A. Outley a Notary Public of New Jersey My Commission Expires April 4, 2023
CERTIFICATION
I, the undersigned officer of HARCO NATIONAL INSURANCE COMPANY and INTERNATIONAL FIDELITY INSURANCE COMPANY do hereby certify that I have compared the foregoing copy of the Power of Attorney and affidavit, and the copy of the Sections of the By-Laws of said Companies as set forth in said Power of Attorney, with the originals on file in the home office of said companies, and that the same are correct transcripts thereof, and of the whole of the said originals, and that the said Power of Attorney has not been revoked and is now in full force and effect.
IN TESTIMONY WHEREOF, I have hereunto set my hand on this day, February 06, 2025 Revelatio
A00982
Irene Martins, Assistant Secretary
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE $ 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California
County of San Diego
On February 6, 2025 before me, _ S. L. Holcomb, Notary Public Date Here Insert Name and Title of the Officer
personally appeared Bart Stewart
Name(s) of Signers)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
AAAAA
S. L. HOLCOMB
COMM. 2478126
SAN DIEGO COUNTY
Comm. Exp. JAN. 1. 2028 C
Signature
Signature of Notary Public
Place Notary Seal Above
- OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.
Description of Attached Document
Title or Type of Document: - Document Date:
Number of Pages: _ Signers) Other Than Named Above:
Capacity(ies) Claimed by Signer(s)
Signer's Name: Signer's Name:
• Corporate Officer - Title(s): • Corporate Officer - Title(s):
• Partner - • Limited • General • Partner - • Limited O General • Individual • Attorney in Fact • Individual • Attorney in Fact • Trustee C Guardian or Conservator • Trustee • Guardian or Conservator • Other: • Other:
Signer Is Representing: Signer Is Representing:
©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 California Acknowledgement Form
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California
County of SAN Dicto
on 03/27/9085 before me, L.Monari (Notary Public personally appeared STEVEN EUGENiO
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(les), and that by his/herther signaturefs) on the instrument the person(s, or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California the the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
L. MONARI
COMM. #24143765
NOTARY PUBLIC-CALIFORNIA
SAN DIEGO COUNTY
My Commission Expires
SEPTEMBER 28. 2026 $
3. Moroni
Signature (Seal)
Name of Document: Bid Boup
LUCAS MONARI
loan signing agent
notary public
+ 1(858) 405-5018
[email protected]
SAN DIEGO. CA
@monarinotan
monarinotarysandiego.com