Bid Item Description Units
Estimated
Quantity Unit Price Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price Total Price
% of
Total Bid
Price Unit Price Total Price
% of Total
Bid Price

BASE BID ITEMS
1 Mobilization LS 1 $150,000.00 $150,000.00 4.43% $217,000.00 $217,000.00 5.83% 164,552.38$ 164,552.38$ 4.18% 250,000.00$ 250,000.00$ 5.01% 2 Traffic Control System LS 1 $240,000.00 $240,000.00 7.08% $229,000.00 $229,000.00 6.16% 238,350.57$ 238,350.57$ 6.05% 262,500.00$ 262,500.00$ 5.26% 3 Water Pollution Control LS 1 $6,500.00 $6,500.00 0.19% $10,000.00 $10,000.00 0.27% 108,120.25$ 108,120.25$ 2.75% 35,000.00$ 35,000.00$ 0.70% 4 Construction Surveying and Staking LS 1 $40,000.00 $40,000.00 1.18% $50,000.00 $50,000.00 1.34% 136,623.77$ 136,623.77$ 3.47% 50,000.00$ 50,000.00$ 1.00% 5 Changeable Message Signs EA 5 $3,200.00 $16,000.00 0.47% $5,100.00 $25,500.00 0.69% 2,273.75$ 11,368.75$ 0.29% 8,000.00$ 40,000.00$ 0.80% 6 Encroachment Permits LS 1 $5,000.00 $5,000.00 0.15% $4,100.00 $4,100.00 0.11% 4,134.09$ 4,134.09$ 0.11% 10,000.00$ 10,000.00$ 0.20% 7 Project Information Sign EA 3 $800.00 $2,400.00 0.07% $2,400.00 $7,200.00 0.19% 2,633.53$ 7,900.59$ 0.20% 10,000.00$ 30,000.00$ 0.60% 8 Furnish/Install Survey Monument per COM std. no. 617B AND 617C EA 2 $1,500.00 $3,000.00 0.09% $2,200.00 $4,400.00 0.12% 4,142.79$ 8,285.58$ 0.21% 5,000.00$ 10,000.00$ 0.20% 9 Adjust Existing Survey Monument to Grade EA 1 $3,200.00 $3,200.00 0.09% $1,860.00 $1,860.00 0.05% 1,343.06$ 1,343.06$ 0.03% 4,000.00$ 4,000.00$ 0.08% 10 Double Adjust Storm Drain Manhole EA 5 $2,200.00 $11,000.00 0.32% $2,200.00 $11,000.00 0.30% 2,883.21$ 14,416.05$ 0.37% 4,500.00$ 22,500.00$ 0.45% 11 Concrete Removal (Curb Ramp, Cross Gutter, Spandrel, Curb/Gutter, Sidewalk) SF 5997 $5.30 $31,784.10 0.94% $6.00 $35,982.00 0.97% 7.87$ 47,196.39$ 1.20% 10.00$ 59,970.00$ 1.20% 12 Construct Concrete Cross Gutters, Spandrel, Curb, and Gutter per City Std. 311, 312 & 318 SF 2385 $25.00 $59,625.00 1.76% $28.00 $66,780.00 1.80% 21.16$ 50,466.60$ 1.28% 30.00$ 71,550.00$ 1.43% 13 Construct Concrete Access Ramps, City Std. 321 SF 3077 $13.75 $42,308.75 1.25% $16.00 $49,232.00 1.32% 13.02$ 40,062.54$ 1.02% 40.00$ 123,080.00$ 2.47% 14 Construct Concrete Sidewalks, City Std. 320 SF 436 $8.50 $3,706.00 0.11% $13.00 $5,668.00 0.15% 7.60$ 3,313.60$ 0.08% 20.00$ 8,720.00$ 0.17% 15 Remove and Dispose of Asphalt Concrete Pavement (average depth 5.3" Digouts on Antelope Rd.) SF 9220 $2.80 $25,816.00 0.76% $4.40 $40,568.00 1.09% 4.44$ 40,936.80$ 1.04% 5.00$ 46,100.00$ 0.92% 16 Remove and Dispose of Asphalt Concrete Pavement (average depth 5.75" Digouts on Los Alamos Rd.) SF 38924 $2.80 $108,987.20 3.22% $2.20 $85,632.80 2.30% 2.22$ 86,411.28$ 2.19% 6.00$ 233,544.00$ 4.68% 17 Remove and Dispose of Aggregate Base and Subgrade Prep (7" depth Base Digout on Elm St.) SF 4110 $3.35 $13,768.50 0.41% $2.40 $9,864.00 0.27% 2.43$ 9,987.30$ 0.25% 10.00$ 41,100.00$ 0.82% 18 Cold Milling Asphalt Concrete Pavement Full Width at 2.375" Depth (Antelope Rd) SY 24139 $4.00 $96,556.00 2.85% $4.80 $115,867.20 3.12% 4.81$ 116,108.59$ 2.95% 8.00$ 193,112.00$ 3.87% 19 Cold Milling Asphalt Concrete Pavement Full Width at 4" Depth For Use in CCPR (Elm St) SY 13295 $14.00 $186,130.00 5.49% $10.50 $139,597.50 3.75% 10.49$ 139,464.55$ 3.54% 10.00$ 132,950.00$ 2.66% 20 Cold Milling Asphalt Concrete Pavement Full Width at 2.25" Depth (Los Alamos Rd) SY 17425 $4.00 $69,700.00 2.06% $4.10 $71,442.50 1.92% 4.13$ 71,965.25$ 1.83% 8.00$ 139,400.00$ 2.79% 21 Cold Milling Asphalt Concrete Pavement 6' Header Grind at 2" Depth (Los Alamos Rd) SY 6239 $3.00 $18,717.00 0.55% $4.10 $25,579.90 0.69% 4.13$ 25,767.07$ 0.65% 8.00$ 49,912.00$ 1.00% 22 Remove Existing AC Dike (Ranges from 2" to 6") LF 3462 $1.00 $3,462.00 0.10% $4.80 $16,617.60 0.45% 4.75$ 16,444.50$ 0.42% 10.00$ 34,620.00$ 0.69% 23 Aggregate Base for Base Digout on Elm St. CY 94 $145.00 $13,630.00 0.40% $122.00 $11,468.00 0.31% 115.31$ 10,839.14$ 0.28% 150.00$ 14,100.00$ 0.28% 24 Install Geotextile Reinforcement (Tensar Triax Geogrid Type 2 or Approved Equal) SY 870 $7.00 $6,090.00 0.18% $9.00 $7,830.00 0.21% 3.06$ 2,662.20$ 0.07% 20.00$ 17,400.00$ 0.35% 25 ARHM Overlay 2" (Los Alamos Rd, Antelope Rd, Elm St) TON 8559 $123.00 $1,052,757.00 31.06% $141.00 $1,206,819.00 32.45% 130.37$ 1,115,836.83$ 28.34% 160.00$ 1,369,440.00$ 27.44% 26 ARHM Overlay 2.25" (Los Alamos Rd) TON 1456 $123.00 $179,088.00 5.28% $148.00 $215,488.00 5.79% 133.54$ 194,434.24$ 4.94% 190.00$ 276,640.00$ 5.54% 27 Install 3/8" ARAM (Antelope Rd) SY 24139 $5.50 $132,764.50 3.92% $5.00 $120,695.00 3.24% 6.53$ 157,627.67$ 4.00% 6.25$ 150,868.75$ 3.02% 28 CCPR AC Pavement 4" (Elm St) TON 2619 $81.00 $212,139.00 6.26% $80.00 $209,520.00 5.63% 173.31$ 453,898.89$ 11.53% 120.00$ 314,280.00$ 6.30% 29 CCPR Mix Design, Sampling, and Testing LS 1 $35,000.00 $35,000.00 1.03% $31,700.00 $31,700.00 0.85% 31,827.34$ 31,827.34$ 0.81% 30,000.00$ 30,000.00$ 0.60% 30 Emulsified Recycling Agent (For use in CCPR) TON 91 $615.00 $55,965.00 1.65% $592.00 $53,872.00 1.45% 594.28$ 54,079.48$ 1.37% 1,000.00$ 91,000.00$ 1.82% 31 Cement (For Use in CCPR) TON 26 $215.00 $5,590.00 0.16% $210.00 $5,460.00 0.15% 206.70$ 5,374.20$ 0.14% 500.00$ 13,000.00$ 0.26% 32 Asphalt Concrete Pavement for Removal and Replacement of AC (Digouts) TON 1636 $145.00 $237,220.00 7.00% $157.00 $256,852.00 6.91% 141.62$ 231,690.32$ 5.88% 180.00$ 294,480.00$ 5.90% 33 Construct 6" AC Dike per City STD. 315 LF 3462 $6.75 $23,368.50 0.69% $8.00 $27,696.00 0.74% 7.28$ 25,203.36$ 0.64% 40.00$ 138,480.00$ 2.77% 34 Furnish/Install Detector Loop EA 153 $450.00 $68,850.00 2.03% $463.00 $70,839.00 1.90% 620.11$ 94,876.83$ 2.41% 550.00$ 84,150.00$ 1.69% 35 Furnish and install #5 pullbox, connect DLC for traffic loops EA 11 $1,275.00 $14,025.00 0.41% $4,900.00 $53,900.00 1.45% 671.79$ 7,389.69$ 0.19% 1,500.00$ 16,500.00$ 0.33% 36 Furnish and install 2" conduit under sidewalk panels or as shown . Connection Type as Shown LF 168 $215.00 $36,120.00 1.07% $284.00 $47,712.00 1.28% 77.51$ 13,021.68$ 0.33% 250.00$ 42,000.00$ 0.84% 37 Furnish and install 2" conduit under sidewalk panels (jack & bore). Connection Type as Shown LF 80 $215.00 $17,200.00 0.51% $258.00 $20,640.00 0.55% 165.36$ 13,228.80$ 0.34% 250.00$ 20,000.00$ 0.40% 38 Furnish and install DLC. Connect loops to existing traffic cabinet LF 3337 $7.25 $24,193.25 0.71% $4.10 $13,681.70 0.37% 5.17$ 17,252.29$ 0.44% 8.50$ 28,364.50$ 0.57% 39 Wet Sandblast/Remove Existing Pavement Markings on bridge deck LF 1505 $5.65 $8,503.25 0.25% $5.50 $8,277.50 0.22% 5.48$ 8,247.40$ 0.21% 3.31$ 4,981.55$ 0.10% 40 Pavement Striping Detail 12 LF 11554 $0.55 $6,354.70 0.19% $0.50 $5,777.00 0.16% 0.52$ 6,008.08$ 0.15% 0.80$ 9,243.20$ 0.19% 41 Pavement Striping Detail 22 LF 4266 $1.05 $4,479.30 0.13% $1.00 $4,266.00 0.11% 1.03$ 4,393.98$ 0.11% 1.35$ 5,759.10$ 0.12% 42 Pavement Striping Detail 25 LF 2218 $0.55 $1,219.90 0.04% $0.50 $1,109.00 0.03% 0.52$ 1,153.36$ 0.03% 0.95$ 2,107.10$ 0.04% 43 Pavement Striping Detail 27B LF 5446 $0.45 $2,450.70 0.07% $0.50 $2,723.00 0.07% 0.47$ 2,559.62$ 0.07% 0.95$ 5,173.70$ 0.10% 44 Pavement Striping Detail 29 LF 9324 $2.10 $19,580.40 0.58% $2.10 $19,580.40 0.53% 2.07$ 19,300.68$ 0.49% 1.35$ 12,587.40$ 0.25% 45 Pavement Striping Detail 32 LF 862 $2.10 $1,810.20 0.05% $2.10 $1,810.20 0.05% 2.07$ 1,784.34$ 0.05% 2.50$ 2,155.00$ 0.04% 46 Pavement Striping Detail 37B LF 688 $0.70 $481.60 0.01% $0.70 $481.60 0.01% 0.67$ 460.96$ 0.01% 1.13$ 777.44$ 0.02% 47 Pavement Striping Detail 38 LF 5506 $0.80 $4,404.80 0.13% $0.80 $4,404.80 0.12% 0.78$ 4,294.68$ 0.11% 1.13$ 6,221.78$ 0.12% 48 Pavement Striping Detail 39 LF 8680 $0.65 $5,642.00 0.17% $0.60 $5,208.00 0.14% 0.62$ 5,381.60$ 0.14% 0.95$ 8,246.00$ 0.17% 49 Pavement Striping Detail 39A LF 2420 $0.55 $1,331.00 0.04% $0.60 $1,452.00 0.04% 0.57$ 1,379.40$ 0.04% 0.95$ 2,299.00$ 0.05% 50 Thermoplastic Striping Detail 40 LF 512 $0.65 $332.80 0.01% $0.60 $307.20 0.01% 0.62$ 317.44$ 0.01% 2.50$ 1,280.00$ 0.03% 51 Pavement Striping 6" Solid White Lane Line LF 1950 $0.55 $1,072.50 0.03% $0.60 $1,170.00 0.03% 0.57$ 1,111.50$ 0.03% 0.95$ 1,852.50$ 0.04% 52 Pavement Striping 12" Solid White Diagonals LF 418 $3.15 $1,316.70 0.04% $3.00 $1,254.00 0.03% 3.05$ 1,274.90$ 0.03% 10.00$ 4,180.00$ 0.08% 53 Paint Pavement Striping 6" Solid White Line (Diagonals for bike lane buffer) LF 543 $2.10 $1,140.30 0.03% $2.00 $1,086.00 0.03% 2.02$ 1,096.86$ 0.03% 7.50$ 4,072.50$ 0.08% 54 Painted Bike Lane Symbol with Person Pavement Marking and Bike Lane Arrow SF 456 $3.15 $1,436.40 0.04% $3.00 $1,368.00 0.04% 3.05$ 1,390.80$ 0.04% 11.25$ 5,130.00$ 0.10% 55 Thermoplastic Pavement Marking "SIGNAL" and "AHEAD" SF 400 $4.00 $1,600.00 0.05% $4.00 $1,600.00 0.04% 3.93$ 1,572.00$ 0.04% 11.25$ 4,500.00$ 0.09% 56 Thermoplastic Pavement Marking "KEEP" and "CLEAR" SF 400 $4.00 $1,600.00 0.05% $4.00 $1,600.00 0.04% 3.93$ 1,572.00$ 0.04% 11.25$ 4,500.00$ 0.09% 57 Thermoplastic Pavement Marking "STOP" SF 50 $4.00 $200.00 0.01% $4.00 $200.00 0.01% 3.93$ 196.50$ 0.00% 11.25$ 562.50$ 0.01% 58 Thermoplastic Pavement Marking (Type IV Arrow) SF 1742 $4.00 $6,968.00 0.21% $4.00 $6,968.00 0.19% 3.93$ 6,846.06$ 0.17% 8.75$ 15,242.50$ 0.31% 59 Thermoplastic Pavement Marking (Type VII Arrow) SF 30 $4.00 $120.00 0.00% $4.00 $120.00 0.00% 3.93$ 117.90$ 0.00% 11.25$ 337.50$ 0.01% 60 Thermoplastic Pavement Marking (Type VI Arrow) SF 72 $4.00 $288.00 0.01% $4.00 $288.00 0.01% 3.93$ 282.96$ 0.01% 11.25$ 810.00$ 0.02% 61 Thermoplastic Pavement Marking (Type I Arrow) SF 48 $4.00 $192.00 0.01% $4.00 $192.00 0.01% 3.93$ 188.64$ 0.00% 11.25$ 540.00$ 0.01% 62 Thermoplastic Pavement Marking (12" White) SF 2493 $4.00 $9,972.00 0.29% $4.00 $9,972.00 0.27% 3.93$ 9,797.49$ 0.25% 6.25$ 15,581.25$ 0.31% 63 Thermoplastic Pavement Marking (12" Yellow) SF 184 $4.00 $736.00 0.02% $4.00 $736.00 0.02% 3.93$ 723.12$ 0.02% 8.75$ 1,610.00$ 0.03% 64 Install Sign Type R3-7 EA 1 $425.00 $425.00 0.01% $410.00 $410.00 0.01% 408.24$ 408.24$ 0.01% 562.50$ 562.50$ 0.01% 65 Install Sign Type R7-9(MOD) EA 4 $425.00 $1,700.00 0.05% $410.00 $1,640.00 0.04% 408.24$ 1,632.96$ 0.04% 562.50$ 2,250.00$ 0.05% 66 Install Type Q (CA) Object Markers with White Retroreflective Sheeting EA 56 $100.00 $5,600.00 0.17% $98.00 $5,488.00 0.15% 98.18$ 5,498.08$ 0.14% 75.00$ 4,200.00$ 0.08% 67 8" Yellow Raised Pavement Markers @2.5' spacing LF 180 $20.00 $3,600.00 0.11% $20.00 $3,600.00 0.10% 19.59$ 3,526.20$ 0.09% 50.00$ 9,000.00$ 0.18% 68 Paint Median Nose Yellow SF 120 $4.25 $510.00 0.02% $4.00 $480.00 0.01% 4.08$ 489.60$ 0.01% 7.50$ 900.00$ 0.02%

ADDITIVE BID ITEMS
69 Double Adjust Manhole (EMWD) EA 10 $1,550.00 $15,500.00 0.46% $2,220.00 $22,200.00 0.60% 1,895.90$ 18,959.00$ 0.48% 4,000.00$ 40,000.00$ 0.80% 70 Single Adjust Manhole (EMWD) EA 9 $950.00 $8,550.00 0.25% $1,200.00 $10,800.00 0.29% 1,164.58$ 10,481.22$ 0.27% 3,500.00$ 31,500.00$ 0.63% 71 Double Adjust Manhole (GTE) EA 2 $1,550.00 $3,100.00 0.09% $2,220.00 $4,440.00 0.12% 7,137.91$ 14,275.82$ 0.36% 4,000.00$ 8,000.00$ 0.16% 72 Single Adjust Manhole (GTE) EA 4 $950.00 $3,800.00 0.11% $1,200.00 $4,800.00 0.13% 4,000.00$ 16,000.00$ 0.41% 3,500.00$ 14,000.00$ 0.28% 73 Double Adjust Manhole (SCE) EA 3 $4,000.00 $12,000.00 0.35% $2,220.00 $6,660.00 0.18% 4,000.00$ 12,000.00$ 0.30% 4,000.00$ 12,000.00$ 0.24% $3,389,678.35 100.00% $3,719,532.90 100.00% 3,937,185.91 $ 100.00% 4,990,923.77 $ 100.00%TOTAL BID PRICE

LOS ALAMOS ROAD, ANTELOPE ROAD, ELM STREET PAVEMENT REHABILITAION PROJECT CITY PROJECT NO. 23-478 (CIP 13047)
BIDS OPENED: 7/15/25 @ 2:00 P.M.

R.J. Noble Company All American Asphalt Vance Corporation Nationwide Contracting Services, Inc