/36/37/37/38/39/40/40/41/41/41/42/43/44/45/42/46/43/42/47/48/49/40/50/48/48/44/51/40/46/48/52/38/53/54/43/55/46/56/57/46/56/44/37/58/42/36/37/52/53 /59/60/61/60/59/62/63/i255/65/66/62/67/i255/68/69/70 /71/72/73/74/75/76/77/73/71/i255/68/73/76/i255/78/79/80/75/81/76/82/79/80/i255/83/75/71/76/84/66/i255/85/74/74/86/78/75/71/84/i255/87/73/79/80/79/72/86/88/81/79/72/79/84/i255/88/72/79/79/89/80/i255/78/79/90/81/72/71/89/73/75/77 /91/89/89/92/80/66/60/60/80/80/72/93/71/76/94/93/82/71/93/90/75/95/60/80/80/72/84/75/75/76/80/60/84/75/75/76/80/96/76/79/92/75/76/89/73/77/90/60/92/79/76/97/60/92/91/92/60/82/79/76/89/73/74/73/82/71/89/79/93/92/91/92 /98/60/98
1 Town Square, Murrieta, CA 92562 ● P a g e | 2 ● www.MurrietaCA.gov
Revision No. 1: Sheet C-4
Updated plans to show an existing sewer line coming off of the existing Maintenance Building called out to be protected in place.
Revision No. 2: Sheet C-4
Changed construction note from “O” to “A” for an existing onsite sewer line.
1 Town Square, Murrieta, CA 92562 ● P a g e | 3 ● www.MurrietaCA.gov Revision No. 3: Sheet C-9
Updated plans to show the existing sewer line comin g from the maintenance building, added sewer cleanout, and added connection to new sewer line.
Revision No. 4: Sheet C-10
Incorporated the previously shown redlines on sheet C-10 of the original advertised bid set of plans into the revised bid set issued via this addendum.
1 Town Square, Murrieta, CA 92562 ● P a g e | 4 ● www.MurrietaCA.gov
Item No. 2: Pre-Bid Job Walk – Agenda and Sign-In Sheet
The City hosted the mandatory Pre-Bid Meeting at Fi re Station 1 located at 41825 Juniper St.
Murrieta, CA. 92562 on September 10 th , 2025 @9:00 am. Per the project specifications, an y contractor bidding on this project as the Prime/Gen eral Contractor was required to be in attendance at this pre-bid meeting. The pre-bid mee ting agenda and sign-in sheet are included in Addendum No. 1 as Attachment No. 1 .
Additionally, there was a question at the pre-bid m eeting regarding the anticipated Notice to Proceed date and start of construction. Please refe rence Instructions to Bidders page 8 (IB-8) section 18 and Special Provisions page 9 (SP-9) sec tion 6-7.1 which states that the Notice to Proceed date is anticipated to be issued on November 17 th , 2025.
The Bid Date and Time remains unchanged on:
TUESDAY, SEPTEMBER 23, 2025 at 2:00:00 P.M.
1 Town Square, Murrieta, CA 92562 ● P a g e | 2 ● www.MurrietaCA.gov
Item No. 4: EXHIBIT A LANDSCAPING AND IRRIGATION
IMPROVEMENTS UPDATE AND CLARIFICATIONS
Changes have been made to Exhibit A “New Landscaping and Irrigation Improvements” of the project Specifications and the updated Exhibit A is included in Addendum No. 2 as Attachment No. 3. The updated Exhibit A “New Landscaping and Irrigation Improvements” issued via Addendum No. 2 as Attachment No. 3 shall hereby be included in the contract documents and supersede the previously provided Exhibit A included in the advertised bid specifications.
Additionally, the following question were asked regarding the landscape and irrigation scope of work pertaining to Bid Item 26 for “New Landscape Improvements”:
Question 1 : There are three existing valves on the northeast side of the building in the planter that are filled with dirt, and one valve box is broken. It is assumed per plan that we are to use these existing valves, please confirm. In addition, are we replacing any of the valve boxes? Response 1: Yes, the Contractor shall remove, replace, and reconnect the three (3) existing irrigation valves and their associated irrigation boxes to match existing. Please reference the updated Exhibit A for “New Landscaping and Irrigation Improvements” included in Addendum No. 2 as Attachment No. 3.
Question 2: There is an existing mow curb and existing plant material on the northeast side of the building, would part of our scope of work be to remove existing plant material and mow curb in this planter?
Response 2: Yes, the existing mow curb indicated on the updated Exhibit A shall be removed.
Additionally, the existing shrubs and grass in the “New Planter Area” indicated on Exhibit A shall also be removed.
Question 3: There is a quick coupler valve exposed next to existing valves, do we need to install a valve box? If so, would this be added to scope of work and would a 10-inch round valve box suffice? Response 3: Yes, the Contractor shall install a new 10” round valve box around the existing exposed quick coupler valve. See updated Exhibit A for reference.
Question 4: Where is the irrigation controller located? Response 4: The irrigation controller is located in the electrical room containing Panel “F” (reference sheet E-3 of the electrical plans for the location of Panel “F”).
Question 5: Is there a specific grass (sod) type to be used to restore front lawn? Response 5: Any disturbed grass (sod)/landscaping in the front lawn shall be restored in kind. The existing grass is fescue.
*All cost associated with the new irrigation valves, valve boxes, and associated connections/hookups shall be included in the lump sum cost paid for Bid Item 26 “New Landscape Improvements” and no additional cost will be allowed therefor.
*All cost associated with removal and disposal of the existing mow curb shall be included in the lump sum cost paid for Bid Item 7 “Demolition” and no additional cost will be allowed therefor.
1 Town Square, Murrieta, CA 92562 ● P a g e | 3 ● www.MurrietaCA.gov *All cost associated with restoration in kind of disturbed existing landscaping shall be included in the cost of various bid items and no additional cost will be allowed therefor.
Please reference Attachment No. 3 for the updated Exhibit A “New Landscaping and Irrigation Improvements”
The Bid Date and Time remains unchanged on:
TUESDAY, SEPTEMBER 23, 2025 at 2:00:00 P.M.