ATT 4 - City Council Priorities Tiers 1-3 - Capital Improvement Plan Projects
Meeting
February 26, 2026
Body
Murrieta City Council
Original file
125 KB
Text extracted from the city's file for reading and search. Open the original on murrieta.legistar1.com. That file is the official record.

ASD CSD CMO ECON DEV ENGINEERING FINANCE FIRE LIBRARY MSD POLICE TIER 1 TIER 1 TIER 1 TIER 1 TIER 1 ‐ ANNUAL TIER 1 TIER 1 TIER 1 TIER 1 TIER 1 ADA Transition Plan
Projects*
Citywide Pickleball Courts* LAHSP Soccer Complex (Long‐ term Plan with
Soccer League)*
Murrieta Innovation Center
Improvements
FY 23/24 Pavement Resurfacing‐
Asphalt
Overlay
Ongoing Central Square
Refinement
Fire Station 1 Sewer‐
Concrete*
Library Flooring‐Sound
Proofing*
Citywide Beautification
(Parks & Landscape)*
Mobile Command Center
TIER 2 Community Center Kitchen
Renovation*
Equestrian Facility ‐ Facility
Condition Eval*
TIER 2 FY 24/25 Pavement Resurfacing‐
Asphalt Overlay
TIER 2 Fire Station 6 ‐ Planning
Project*
Children's Library
Expansion*
Ped Safety Enh FY 24/25* TIER 2
None
Alderwood Community
Center Security System*
Equestrian Facility ‐ Eval of
Alternative
Operational Models
None
FY 25/26 Pavement Resurfacing‐
Asphalt Overlay Citywide ERP System
Fire Station 1 Remodeling
Project*
Library‐Fire Alarm System
Replacement*
FY 24/25 Street Name Sign
Replacement* None
TIER 3 Cal Oaks Sports Park
Revitalization*
TIER 2 TIER 3 FY 25/26 Slurry Seal TIER 3 City Hall & Fire Station 1 Generator Project*
Library‐Public Address
System*
FY 25/26 Sidewalk
Replacement*
TIER 3
None TIER 2 None Downtown Parking
Structure
FY 23/24 Pedestrian Safety
Enhancement
None Fire EOC Equipment Library Rain Drainage
Mitigation*
MSD Yard Facility
Master Plan/Expansion*
Police Department
Building Expansion*
Los Alamos Hills Sports Park
Phase 1*
(Near Term Improvements)
TIER 3 FY 24/25 Pedestrian Safety
Enhancement
Tiller Truck‐NEW TIER 2 FY26/27 Citywide Slurry
Seal*
Cal Oaks Sports Park
Pool Replacement*
Civic Center Development ‐
City Hall Expansion*
FY 25/26 Pedestrian Safety
Enhancement
Type 1‐Replacement Library Community Room
Technology*
TIER 2
Vintage Reserve
Restroom Project*
Freeway Overpass Signage FY 24/25 Pavement
Management Program
TIER 2 TIER 3 None
TIER 3 FY 25/26 Pavement Mgmt
System
Murrieta Regional Public
Safety Training Facility*
None TIER 3
Cal Oaks Sports Park
Skate Park Fencing*
FY 25/26 Neighborhood
Traffic
Fire Station 3
Remodeling Project*
FY 25/26 Hist. Downtown
Traffic Signals/Street
Mapleton Park
Shade Covers*
FY 25/26 Citywide Signal
Modification
Fire Station 5
Permanent Structure*
Traffic Center*
Alderwood Park
Splash Pad*
FY 25/26 Traffic Signal
Optimization
TIER 3
Veteran's Memorial* FY 25/26 Priority Traffic
Signal
Fire Station 2
Concrete Replacement*
Pioneer Park
Phase Two*
TIER 1 ‐ MULTI YEAR Fire Station 2
Remodeling Project*
Town Square Signage* MHSR Widening: Margarita‐
Date
Develop BMX Pump Track* Madison: MHSR ‐ Elm St
Murrieta Creek
Regional Trail*
I‐215 @ Keller Road
Hayes Ave Bridge @
Miller Cyn
MHSR/Alta Murrieta Dr
Intersection
Menifee Road Improvements‐
Clinton Keith
In‐Pavement LED Lighted
Crosswalks
Trafifc Signal Adaptive
Timing Program
ASD CSD CMO ECON DEV ENGINEERING FINANCE FIRE LIBRARY MSD POLICE Line F Channel
Jefferson St. at Magnolia St.

Traffic Signal
Storm Drain Master Plan
Storm Drain Trash
Interceptors
Line D Box Culvert Ext. at
MHS
Jefferson Widen @
Ballesteros
Whitewood: Hunter-Clinton
Keith
I-215 @ Clinton Keith
I‐15 @ Cal Oaks
Interchange
TIER 2
Open Channel Annual
Maintenance Program
Guava St Impr: Jefferson to
Date
Line D/D1: Madison to
Jefferson
Line E
Guava Bridge @ Murrieta
Creek
Jackson Ave Impr @ Warm
Springs Creek
Meadowlark (Whitewood)
Impr
Citywide Bridge
Preservation
Warm Springs Parkway
TIER 3
Date St Impr
Murrieta Creek Design
Hancock Avenue @
Walsh Center
I‐15 @ MHSR Modification
Whitewood Extension:

MHSR to Jackson
ASD CSD CMO ECON DEV ENGINEERING FINANCE FIRE LIBRARY MSD POLICE Jackson Ave Median
HIGH PRIORITY
Madison Ave Bridge @
Warm Springs Creek
MEDIUM PRIORITY
Vista Murrieta Road
LOW PRIORITY Monroe Avenue
Line G Channel: Adams to
Murrieta Creek
*As of 1/9/26 CIP Prioritization, Tier 1 Responses by Department based on 09/30/25 CIP Budget to Actual Reports CIP PROJECTS PRIORITIZATION AS OF 2‐02‐2026    Attachment 4 CIP PROJECTS PRIORITIZATION AS OF 2‐02‐2026
* = Led by Municipal Services Department
CIP PROJECTS PRIORITIZATION AS OF 2‐02‐2026