ASD CSD CMO ECON DEV ENGINEERING FINANCE FIRE LIBRARY MSD POLICE TIER 1 TIER 1 TIER 1 TIER 1 TIER 1 ‐ ANNUAL TIER 1 TIER 1 TIER 1 TIER 1 TIER 1 ADA Transition Plan
Projects*
Citywide Pickleball Courts* LAHSP Soccer Complex (Long‐ term Plan with
Soccer League)*
Murrieta Innovation Center
Improvements
FY 23/24 Pavement Resurfacing‐
Asphalt
Overlay
Ongoing Central Square
Refinement
Fire Station 1 Sewer‐
Concrete*
Library Flooring‐Sound
Proofing*
Citywide Beautification
(Parks & Landscape)*
Mobile Command Center
TIER 2 Community Center Kitchen
Renovation*
Equestrian Facility ‐ Facility
Condition Eval*
TIER 2 FY 24/25 Pavement Resurfacing‐
Asphalt Overlay
TIER 2 Fire Station 6 ‐ Planning
Project*
Children's Library
Expansion*
Ped Safety Enh FY 24/25* TIER 2
None
Alderwood Community
Center Security System*
Equestrian Facility ‐ Eval of
Alternative
Operational Models
None
FY 25/26 Pavement Resurfacing‐
Asphalt Overlay Citywide ERP System
Fire Station 1 Remodeling
Project*
Library‐Fire Alarm System
Replacement*
FY 24/25 Street Name Sign
Replacement* None
TIER 3 Cal Oaks Sports Park
Revitalization*
TIER 2 TIER 3 FY 25/26 Slurry Seal TIER 3 City Hall & Fire Station 1 Generator Project*
Library‐Public Address
System*
FY 25/26 Sidewalk
Replacement*
TIER 3
None TIER 2 None Downtown Parking
Structure
FY 23/24 Pedestrian Safety
Enhancement
None Fire EOC Equipment Library Rain Drainage
Mitigation*
MSD Yard Facility
Master Plan/Expansion*
Police Department
Building Expansion*
Los Alamos Hills Sports Park
Phase 1*
(Near Term Improvements)
TIER 3 FY 24/25 Pedestrian Safety
Enhancement
Tiller Truck‐NEW TIER 2 FY26/27 Citywide Slurry
Seal*
Cal Oaks Sports Park
Pool Replacement*
Civic Center Development ‐
City Hall Expansion*
FY 25/26 Pedestrian Safety
Enhancement
Type 1‐Replacement Library Community Room
Technology*
TIER 2
Vintage Reserve
Restroom Project*
Freeway Overpass Signage FY 24/25 Pavement
Management Program
TIER 2 TIER 3 None
TIER 3 FY 25/26 Pavement Mgmt
System
Murrieta Regional Public
Safety Training Facility*
None TIER 3
Cal Oaks Sports Park
Skate Park Fencing*
FY 25/26 Neighborhood
Traffic
Fire Station 3
Remodeling Project*
FY 25/26 Hist. Downtown
Traffic Signals/Street
Mapleton Park
Shade Covers*
FY 25/26 Citywide Signal
Modification
Fire Station 5
Permanent Structure*
Traffic Center*
Alderwood Park
Splash Pad*
FY 25/26 Traffic Signal
Optimization
TIER 3
Veteran's Memorial* FY 25/26 Priority Traffic
Signal
Fire Station 2
Concrete Replacement*
Pioneer Park
Phase Two*
TIER 1 ‐ MULTI YEAR Fire Station 2
Remodeling Project*
Town Square Signage* MHSR Widening: Margarita‐
Date
Develop BMX Pump Track* Madison: MHSR ‐ Elm St
Murrieta Creek
Regional Trail*
I‐215 @ Keller Road
Hayes Ave Bridge @
Miller Cyn
MHSR/Alta Murrieta Dr
Intersection
Menifee Road Improvements‐
Clinton Keith
In‐Pavement LED Lighted
Crosswalks
Trafifc Signal Adaptive
Timing Program
ASD CSD CMO ECON DEV ENGINEERING FINANCE FIRE LIBRARY MSD POLICE Line F Channel
Jefferson St. at Magnolia St.
Traffic Signal
Storm Drain Master Plan
Storm Drain Trash
Interceptors
Line D Box Culvert Ext. at
MHS
Jefferson Widen @
Ballesteros
Whitewood: Hunter-Clinton
Keith
I-215 @ Clinton Keith
I‐15 @ Cal Oaks
Interchange
TIER 2
Open Channel Annual
Maintenance Program
Guava St Impr: Jefferson to
Date
Line D/D1: Madison to
Jefferson
Line E
Guava Bridge @ Murrieta
Creek
Jackson Ave Impr @ Warm
Springs Creek
Meadowlark (Whitewood)
Impr
Citywide Bridge
Preservation
Warm Springs Parkway
TIER 3
Date St Impr
Murrieta Creek Design
Hancock Avenue @
Walsh Center
I‐15 @ MHSR Modification
Whitewood Extension:
MHSR to Jackson
ASD CSD CMO ECON DEV ENGINEERING FINANCE FIRE LIBRARY MSD POLICE Jackson Ave Median
HIGH PRIORITY
Madison Ave Bridge @
Warm Springs Creek
MEDIUM PRIORITY
Vista Murrieta Road
LOW PRIORITY Monroe Avenue
Line G Channel: Adams to
Murrieta Creek
*As of 1/9/26 CIP Prioritization, Tier 1 Responses by Department based on 09/30/25 CIP Budget to Actual Reports CIP PROJECTS PRIORITIZATION AS OF 2‐02‐2026 Attachment 4 CIP PROJECTS PRIORITIZATION AS OF 2‐02‐2026
* = Led by Municipal Services Department
CIP PROJECTS PRIORITIZATION AS OF 2‐02‐2026
PRIORITY COLOR CODE: