For City Clerk Use Only
Contract No._________

AGREEMENT FOR PROFESSIONAL SERVICES
WITH THE CITY OF MURRIETA (“CITY”)
Project Name/Description (“Project”): Storm Drain Master Plan Consultant Name (“Consultant”): Rick Engineering Company Consultant Business Type: Corporation
Consultant Address: 5620 Friars Road, San Diego, CA 92110 Consultant Representative Name and Title (“Consultant Representative”): Brendan Hastie, Vice President
Consultant Representative Work Phone and Email: (619) 204-5979, [email protected] Termination Date: May 1, 2028
Total Not-To-Exceed Contract Amount (“Contract Sum”): $564,600.00 City Department Contact (“Department Contact”): Jeff Hitch, City Engineer Department Contact Work Phone: (951) 461-6076
Department Contact Email: [email protected]
Is Federal Funding Being Used to Fund Any Part of The Project (Yes/No): No

RECITALS
The City desires to contract with a Consultant to provide professional services as more furth
er set forth herein.

The Ci
ty circulated a Request for Quotes or Proposals for the above-described professional services.

Consult
ant submitted a proposal to City to provide the above -described professional services.

City S
taff has reviewed all the proposals and after considering the demonstrated competence of Consultant, the professional qualifications of Consultant, and the fairness and reasonableness of Consultant’s proposed cost, staff has determined that an agreement to provide the required services should be awarded to Consultant.

AGREEMENT FOR PROFESSIONAL SERVICES
WITH THE CITY OF MURRIETA (“CITY”)
THI
S AGREEMENT FOR SERVICES (“Agreement”) is made and entered into as of the effective on the date executed by the City by and between CITY OF MURRIETA, a California municipal corporation (“ City”) and (“Consultant ”). City and Consultant may be referred to individually as “Party” or collectively as “Parties.” In consideration of the mutual promises and covenants made by the Parties and contained herein and other consideration, the value and adequacy of which are hereby acknowledged, the Parties agree as follows:

ARTI
CLE 1. SERVICES OF CONSULTANT

1.1 Scope of Services. In compliance with all terms and conditions of this Agreement, Consultant shall provide those services specified in the “ Scope of Services ” attached hereto as Exhibit “A” and incorporated herein by this reference, which may be referred to herein as the “services ” or “ work” hereunder. As a material inducement to City entering into this Agreement, Consultant represents and warrants: a) it has the qualifications, experience, and facilities necessary to properly perform the Services required under this Agreement b) all services set forth in the Scope of Services will be performed in a competent and satisfactory manner; c) all materials used for services will be both of good quality as well as fit for the purpose intended; and, d) Consultant shall follow the highest professional standards and practices in performing the services required hereunder.

1.2 Consultant’s Proposal. The Scope of Services shall include the scope of services or work included in Consultant’s proposal or bid, which shall be incorporated herein by this reference as though fully set forth herein. In the event of any inconsistency between the terms of such proposal or bid, and this Agreement, the terms of this Agreement shall govern. No other terms and conditions from Consultant’s proposal or bid, other than description of scope of services or work, shall apply to this Agreement, unless specifically agreed to by City in writing.

1.3 Compliance with Law. All services rendered hereunder shall be provided in accordance with all ordinances, resolutions, statutes, rules and regulations of City and any federal, State or local governmental agency having jurisdiction in effect at the time services are rendered. City, and its officers, employees and agents, shall not be liable at law or in equity for failure of Consultant to comply with this Section.

1.4 Licenses, Permits, Fees and Assessments. Consultant shall obtain at its sole cost and expense such licenses, permits and approvals as may be required by law for the performance of the services required by this Agreement. Consultant shall have the sole obligation to pay for any fees, assessments and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for Consultant’s performance of the services required by this Agreement, and shall indemnify, defend and hold harmless City against any such fees, assessments, taxes, penalties or interest levied, assessed or imposed against City hereunder.

1.5 Familiarity with Work. By executing this Agreement, Consultant represents and warrants Consultant: a) has thoroughly investigated and considered services to be performed, b) has carefully considered how services should be performed, and c) fully understands the facilities, difficulties and restrictions attending performance of services under this Agreement.

1.6 Software and Computer Services. If the Scope of Services includes the provision and/or installation of any software, computer system, or other computer technology, Consultant represents and warrants that it is familiar with and/or has inspected City’s current infrastructure, equipment, computer system and software and that the software, computer system, or other computer technology provided and/or installed by Consultant under this Agreement is compatible, and shall be fully functional, with such infrastructure, equipment, computer system and software of City . Consultant acknowledges that City is relying on this representation by Consultant as a material consideration in entering into this Agreement.

1.7 Prevailing Wages. If services include any “public work” or “maintenance work,” as those terms are defined in California Labor Code section 1720 et seq. and California Code of Regulations, Title 8, s ection 16000 et seq. , and if the total compensation is $1,000 or more, Consultant shall pay prevailing wages for such work and comply with the requirements in California Labor Code section 1770 et seq. and 1810 et seq., and all other applicable laws.

1.8 Contract Modifications. Additional terms and conditions of this Agreement, if any, or any modifications or revisions to the standard terms and conditions herein are made a part hereof as set forth in the “Contract Modifications” attached hereto as Exhibit “B” and incorporated herein by this reference. In the event of a conflict between the provisions of Exhibit B and any other provisions of this Agreement, the provisions of Exhibit B shall govern.

ARTICLE 2. COMPENSATION AND METHOD OF PAYMENT

2.1 Contract Sum. Subject to any limitations set forth in this Agreement, City agrees to pay Consultant the rates specified in the “Schedule of Compensation” attached hereto as Exhibit “C” and incorporated herein by this reference . The total compensation for all work, including reimbursement for actual expenses, shall not exceed the Contract Sum set forth above . Compensation may include reimbursement, for actual and necessary expenditures , if both are specified in the Schedule of Compensation, as well as approved by City in advance.

2.2 Invoices. Unless some other method of payment is specified in Exhibit C, Schedule of Compensation, in any month in which Consultant wishes to receive payment, no later than the first business day of such month, Consultant shall submit to City, in a form approved by City’s Finance Director, an invoice for services rendered prior to the date of the invoice. By submitting an invoice for payment under this Agreement, Consultant is certifying compliance with all provisions of this Agreement. Except as provided in Sections 7.3, 7.4 and 7.5, City shall pay Consultant for all expenses stated thereon which are approved by City pursuant to this Agreement generally within thirty (30) days, and City will use its best efforts to make payment no later than forty- five (45) days, from the submission of an invoice in an approved form. In the event any charges or expenses are disputed by City, the original invoice shall be returned by City to Consultant for correction and resubmission. Review and payment by City for any invoice provided by Consultant shall not constitute a waiver of any rights or remedies provided herein or any applicable law. Each invoice is to include (unless otherwise specified by City) : 1) line items for all personnel describing the work performed, the number of hours worked, and the hourly rate; 2) line items for all materials and equipment properly charged to the Services; 3) line items for all other approved reimbursable expenses claimed, with supporting documentation; and 4) line items for all approved subcontractor labor, supplies, equipment, materials, and travel properly charged to the Services.

ARTICLE 3. PERFORMANCE SCHEDULE

3.0 Time of Essence. Time is of the essence in the performance of this Agreement.

3.1 Term. The Agreement shall commence and become effective upon the date executed by the City and will continue until the Termination Date. This Agreement may be extended for up to two, additional one -year periods upon the mutual agreement in writing of both parties.

Unless earlier terminated in accordance with Article 7 of this Agreement, this Agreement shall continue in full force and effect until completion of any ongoing services, which shall be no later than the Termination Date set forth above.

Notwithstanding the foregoing, the Indemnification and Insurance provisions set forth in Article 5 shall survive the termination of this Agreement.

3.2 Schedule of Performance. Consultant shall commence the services pursuant to this Agreement upon receipt of a written notice to proceed from City and shall perform all services within the time period(s) established in Exhibit A.

3.3 Force Majeure. The time period(s) specified in Exhibit A for performance of the services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of Consultant , including, but not restricted to, acts of God or of the public enemy, unusually severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, and/or acts of any governmental agency, including City, if Consultant shall within ten (10) days of the commencement of such delay notify City in writing of the causes of the delay.

City shall ascertain the facts and the extent of delay, and extend the time for performing the services for the period of the enforced delay when and if in the judgment of City such delay is justified. City’s determination shall be final and conclusive upon the Parties to this Agreement. In no event shall Consultant be entitled to recover damages against City for any delay in the performance of this Agreement, however caused, Consultant’s sole remedy being extension of this Agreement pursuant to this Section.

ARTICLE 4. COORDINATION OF WORK

4.1 Representative of Consultant. The Consultant Representative is authorized to act on Consultant’s behalf with respect to the work or services specified herein and to make all decisions in connection therewith. It is expressly understood that the experience, knowledge, capability and reputation of the representative was a substantial inducement for City to enter into this Agreement. Therefore, the representative shall be responsible during the term of this Agreement for directing all activities of Consultant and devoting sufficient time to personally supervise the services hereunder. For purposes of this Agreement, the representative may not be replaced nor may their responsibilities be substantially reduced by Consultant without the express written approval of City.

4.2 Department Contact for City . The Department Contact (or other person designated by the City Manager) shall be the primary person on behalf of City responsible for the administration of the Agreement. It shall be Consultant ’s responsibility to assure that the Department Contact is kept informed of both the progress of the performance of the services as well as any decisions which must be made by City.

4.3 Approvals from City. City approvals or actions, pursuant to the authority of this Agreement, are to be made (unless otherwise specified) either by the Department Contact, City Manager or by their delegate as provided for in writing.

4.4 Independent Co ntractor. Neither City , nor any of its officers, employees or agents, shall have any control over the manner or means by which Consultant , or its officers, employees, agents or subcontractors, perform the services required herein, except as otherwise set forth herein. Consultant shall perform all services required herein as an independent contractor of City and shall remain under only such obligations as are consistent with that role. Consultant shall not at any time or in any manner represent that it, or any of its officers, employees, agents or subcontractors, are officers, employees or agents of City. City shall not in any way or for any purpose become or be deemed to be a partner of Consultant in its business or otherwise or a joint venturer or a member of any joint enterprise with Consultant.

Consultant shall not incur or have the power to incur any debt, obligation or liability whatever against City, or bind City in any manner. Consultant represents and warrants that the personnel used to provide services to City pursuant to this Agreement shall at all times be under Consultant’s exclusive control and direction.

No City employee benefits shall be available to Consultant, its officers, employees, agents or subcontractors, in connection with the performance of this Agreement.

City shall not be liable for compensation or indemnification to Consultant , its officers, employees, agents or subcontractors, for injury or sickness arising out of performing services hereunder. In the event that Consultant or any officer, employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a federal or state agency, a court of competent jurisdiction, or the California Public Employees’ Retirement System, to be classified as other than an independent contractor for City, then Consultant shall indemnify, defend, and hold harmless City for the payment of any and all assessed fines, penalties, judgments, employee and/or employer contributions, and any other damages and costs assessed to City as a consequence of, or in any way attributable to, the assertion that Consultant , or any officer, employee, agent, or subcontractor Consultant used to provide services under this Agreement, is/are employees of City.

4.5 Subcontracting or Assignment. The experience, knowledge, capability and reputation of Consultant , its principals and employees were a substantial inducement for City to enter into this Agreement. Therefore, without express written approval of City, Consultant shall not contract with any other City to perform in whole or in part services required hereunder without express written approval of City, and neither this Agreement nor any interest herein may be transferred or assigned. No approved transfer shall release Consultant, or any surety or insured of Consultant, of any liability hereunder without express written consent of City.

ARTICLE 5. INSURANCE AND INDEMNIFICATION

5.1 Insurance Coverages. Prior to commencement of any services under this Agreement, and without limiting Consultant’s indemnification obligation to City, Consultant shall procure and maintain, at its sole cost and expense, in a form and content satisfactory to City, for the duration of the Agreement, primary policies of insurance of the type and amounts set forth in the “Insurance Requirements” attached hereto as Exhibit “D” and incorporated herein by this reference.

5.2 Indemnification.
(a) General Obligations. Except as set forth for Design Professionals below, Consultant agrees, to the full extent permitted by law, to indemnify, defend and hold harmless City and its elected and appointed officers, employees and agents (each an “Indemnitee” and collectively, “Indemnitees”) against, and will hold and save them and each of them harmless from, whether actual or threatened, any and all actions, either judicial, administrative, arbitration or regulatory claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities (herein “Claims or Liabilities”) that may be asserted or claimed by any person, firm or City arising out of or in connection with the negligent performance of the work, operations or activities provided herein of Consultant, its officers, employees, agents, subcontractors, or invitees, or any individual or entity for which Consultant is legally liable (each an “ Indemnitor” and collectively, “Indemnitors”), or arising from Indemnitors’ reckless or willful misconduct, or arising from Indemnitors’ negligent performance of or failure to perform any term, provision, covenant or condition of this Agreement, and in connection therewith:
1) Consultant will defend any action or actions filed or threatened in connection with any such Claims or Liabilities, or at option of Indemnitee(s) will reimburse and pay for all costs and expenses, including legal costs and attorneys’ fees, incurred by Indemnitee(s) in connection therewith; and, 2) Consultant will promptly pay any judgment rendered against Indemnitee(s) for any such Claims or Liabilities, and will save and hold Indemnitee(s) harmless therefrom. (b) Further Provisions. The indemnity obligation herein shall be binding on successors, assigns and heirs of Consultant and shall survive termination of this Agreement. Consultant shall incorporate similar indemnity agreements as provided herein with its subcontractors, and if Consultant fails to do so Consultant shall be fully responsible to indemnify City hereunder therefor. Failure of City and/or City Parties (collectively “City” for solely this Section 5. 2(b)) to monitor compliance with any of the indemnification provisions herein shall not be a waiver hereof. The indemnification provisions herein do not apply to claims or liabilities occurring as a result of City’s sole negligence or willful misconduct, but, to the fullest extent permitted by law, shall apply to claims and liabilities resulting in part from City’s negligence, except that design professionals’ indemnity hereunder shall be limited to claims and liabilities arising out of the negligence, recklessness or willful misconduct of the design professional. The indemnification provided herein includes Claims or Liabilities arising from any negligent or wrongful act, error or omission, or reckless or willful misconduct of Indemnitors in the performance of professional services hereunder. Payment of invoices by City is not a condition precedent to enforcement of the indemnity obligation herein. In the event of any dispute between Consultant and City, as to whether liability arises from the sole negligence or willful misconduct of City, Consultant will be obligated to pay for City’s defense until such time as a final judgment has been entered adjudicating City as solely negligent or responsible for willful misconduct. Consultant will not be entitled in the absence of such a determination to any reimbursement of defense costs including but not limited to attorney’s fees, expert fees and costs of litigation. (c) Pursuant to the full language of California Civil Code §2782, and only if Consultant qualifies as a D esign Professional , Consultant agrees to indemnify, including the cost to defend, City and its officers, officials, employees, and volunteers from and against any and all claims, demands, costs, or liability that arise out of, or pertain to, or relate to the negligence, recklessness, or willful misconduct of Consultant and its employees or agents in the performance of services under this contract, but this indemnity does not apply to liability for damages arising from the sole negligence, active negligence, or willful acts of the City; and does not apply to any passive negligence of the City unless caused at least in part by the Consultant. The City agrees that in no event shall the cost to defend charged to the Consultant exceed Consultant’s proportionate percentage of fault.

This duty to indemnify shall not be waived or modified by contractual agreement or acts of the parties.

5.3 Professional Liability. When the law establishes a professional standard of care for Consultant’s services, to the fullest extent permitted by law, Consultant shall indemnify, defend and hold harmless Indemnitees against, and will hold and save them and each of them harmless from , whether actual or threatened, any and all Claims and Liabilities, consistent with all obligations provided for in this Section

5.3, to the extent same are caused in whole or in part by any negligent or wrongful act, error or omission, or reckless or willful misconduct of Indemnitors in the performance of professional services under this Agreement.

ARTICLE 6. RECORDS, REPORTS AND RELEASE OF INFORMATION

6.1 Records. Consultant shall keep, and require subcontractors to keep, such ledgers, books of accounts, invoices, vouchers, canceled checks, reports, studies or other documents relating to the disbursements charged to City and services performed hereunder (“books and records ”) as shall be necessary to perform the services required by this Agreement and enable City to evaluate the performance of such services. Any and all such books and records shall be maintained in accordance with generally accepted accounting principles, shall be complete and detailed, and shall be readily a ccessible. City shall have full and free access to such books and records at all times during normal business hours of City, including the right to inspect, copy, audit and make records and transcripts. Such books and records shall be maintained for a period of three (3) years following completion of the services hereunder. City shall have access to such books and records in the event any audit is required. Consultant shall fully cooperate with City in providing access to any and all Consultant records and documents if a public records request is made and disclosure is required by law including but not limited to the California Public Records Act.

6.2 Ownership of Documents. All drawings, specifications, maps, designs, photographs, studies, surveys, data, notes, computer files, reports, records, documents and other materials (“documents and materials ”) prepared by Consultant, its officers, employees, agents and subcontractors in the performance of this Agreement shall be the property of City and shall be delivered to City upon request of City and/or upon the termination of this Agreement, and Consultant shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership, use, reuse, or assignment of the documents and materials hereunder. Consultant may retain copies of such documents and materials for its own use. Consultant shall have the right to use the concepts embodied therein. All subcontractors shall provide for assignment to City of any documents and materials prepared by them, and in the event Consultant fails to secure such assignment, Consultant shall indemnify City for all damages resulting therefrom. Moreover, with respect to any Consultant documents and materials that may qualify as “works made for hire” as defined in 17 U.S.C. § 101, such documents and materials are hereby deemed “works made for hire” for City.

6.3 Confidentiality and Release of Information. All information gained or work product produced by Consultant in its performance of this Agreement shall be considered confidential, unless such information is in the public domain or already known to Consultant. Consultant shall not release or disclose any such information or work product to persons or entities other than City without prior written authorization from City . Consultant, its officers, employees, agents or subcontractors, shall not, without prior written authorization from City or unless requested by the City Attorney, voluntarily provide documents, declarations, letters of support, testimony at depositions, response to interrogatories or other information concerning the work performed under this Agreement. Response to a subpoena or court order shall not be considered “voluntary” provided Consultant immediately gives City notice of such court order or subpoena. If Consultant, or any officer, employee, agent or subcontractor of Consultant, provides any information or work product in violation of this Agreement, then City shall have the right to reimbursement and indemnity from Consultant for any damages, costs and fees, including attorney’s fees, caused by or incurred as a result of Consultant’s conduct. As concerning, r egarding or related to, in any way, this Agreement and the work performed thereunder: a) Consultant shall immediately notify City should Consultant, its officers, employees, agents or subcontractors be served with any summons, complaint, subpoena, notice of deposition, request for documents, interrogatories, request for admissions or other discovery request, court order or subpoena from any party; b) City retains the right, but has no obligation, to represent Consultant or be present at any deposition, hearing or similar proceeding; and, c) Consultant agrees to cooperate fully with City and to provide City with the opportunity to review any response to discovery requests provided by Consultant , however, this right to review any such response does not imply or mean the right by City to control, direct, or rewrite said response.

ARTICLE 7. ENFORCEMENT OF AGREEMENT AND TERMINATION

7.1 California Law. This Agreement shall be interpreted, construed and governed both as to validity and to performance of the Parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Riverside, State of California, or any other appropriate court in such county, and Consultant agrees to submit to the personal jurisdiction of such court in the event of such action. In the event of litigation in a U.S. District Court, venue shall lie exclusively in the Central District of California, in the County of Riverside, State of California.

7.2 Suspension, or Termination, Prior to Expiration of Term. This Section shall govern any termination of this Agreement except as specifically provided in Section

7.4 for termination for cause. City reserves the right to terminate or suspend this Agreement, or any portion hereof, at any time, for any reason, with or without cause, upon ten (10) days’ notice to Consultant, except that where termination or suspension is due to the fault of Consultant, the period of notice may be such shorter time as determined by City . Upon receipt of any notice of termination or suspension, Consultant shall immediately cease all services hereunder , unless the notice provides otherwise, or except such as specifically approved by City . Upon submittal of an invoice consistent with Section 2. 2, Consultant shall be entitled to compensation for all services rendered prior to the effective date of the notice of termination or suspension and for any services authorized by City thereafter in accordance with the Schedule of Compensation, or such a s may be approved by City, except as provided in Section 7.5. In event of termination, or suspension, without cause pursuant to this Section, there is no need to provide opportunity to cure pursuant to Section 7.3.

7.3 Default of Consultant and Opportunity to Cure. In the event that Consultant is in default under the terms of this Agreement, City shall not have any obligation or duty to continue compensating Consultant for any work performed after the date of default. Instead, City may give notice to Consultant of the default and the reasons for the default. The notice shall include the timeframe in which Consultant may cure the default. This timeframe is presumptively ten (10) days, but may be extended, or reduced, if circumstances warrant, as determined by City. During the period of time that Consultant is in default, City shall hold all invoices and shall, when the default is cured, proceed with payment on the invoices , without liability for interest. In the alternative, City may, in its sole discretion, elect to pay some or all of the outstanding invoices during the period of default. If Consultant does not cure the default by conclusion of noticed timeframe , City may immediately both terminate this Agreement with notice to Consultant as well as pursue the remedy in Section 7.4, without prejudice to any other remedy to which City may be entitled at law, in equity or under this Agreement . Any failure on the part of City to give notice of Consultant ’s default shall not be deemed to result in a waiver of City ’s legal rights or any rights arising out of any provision of this Agreement.

7.4 Termination for Default of Consultant. If termination is due to the failure of Consultant to fulfill its obligations under this Agreement, City may, after compliance with the provisions of Section 7.3, take over the work and prosecute the same to completion by contract or otherwise, and Consultant shall be liable to the extent that the total cost for completion of the services required hereunder exceeds the compensation herein stipulated (provided that City shall use reasonable efforts to mitigate such dama ges), and City may withhold any payments to Consultant for the purpose of set-off or partial payment of the amounts owed City therefor.

7.5 Retention of Funds. Consultant hereby authorizes City to deduct from any amount payable to Consultant (whether or not arising out of this Agreement) (i) any amounts the payment of which may be in dispute hereunder or which are necessary to compensate City for any losses, costs, liabilities, or damages suffered by City, and (ii) all amounts for which City may be liable to third parties, by reason of Consultant’s acts or omissions in performing or failing to perform Consultant’s obligation under this Agreement. In the event that any claim is made by a third party, the amount or validity of which is disputed by Consultant, or any indebtedness shall exist which shall appear to be the basis for a claim of lien, City may withhold from any payment due, without liability for interest because of such withholding, an amount sufficient to cover such claim. The failure of City to exercise such right to deduct or to withhold shall not, however, affect the obligations of Consultant to insure, indemnify, and protect City as elsewhere provided herein.

7.6 Waiver. Waiver by any Party to this Agreement of any term, condition, or covenant of this Agreement shall not constitute a waiver of any other term, condition, or covenant. Waiver by any Party of any breach of the provisions of this Agreement shall not constitute a waiver of any other provision or a waiver of any subsequent breach or violation of any provision of this Agreement. Acceptance by City of any work or services by Consultant shall not constitute a waiver of any of the provisions of this Agreement. No delay or omission in the exercise of any right or remedy by a non-defaulting Party on any default shall impair such right or remedy or be construed as a waiver. Any waiver by either Party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement. Consultant acknowledges and agrees that any actual or alleged failure on the part of City to inform Consultant of non- compliance with any requirement of this Agreement imposes no additional obligations on City nor does it waive any rights hereunder. Payment to Consultant for work performed pursuant to this Agreement shall not be deemed to waive any defects in work performed by Consultant.

7.7 Rights and Remedies are Cumulative. Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the Parties are cumulative and the exercise by either Party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other Party.

7.8 Legal Action. In addition to any other rights or remedies, either Party may take legal action, in law or in equity, to cure, correct or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement. Notwithstanding any contrary provision herein, Consultant shall file a statutory claim pursuant to Government Code s ections 905 et seq. and 910 et seq., in order to pursue a legal action under this Agreement.

7.9 Attorneys’ Fees. If either Party to this Agreement is required to initiate or defend or made a party to any action or proceeding in any way connected with this Agreement, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorneys ’ fees. Attorneys’ fees shall include attorneys ’ fees on any appeal, and a Party entitled to attorneys’ fees shall be entitled to all other reasonable costs for investigating such action, consultants’ fees, taking depositions and discovery and all other necessary costs the court allows which are incurred in such litigation. Such fees and costs shall be enforceable whether or not such action is prosecuted to judgment.

ARTICLE 8. INDIVIDUAL LIABILITY, CONFLICTS AND NON-DISCRIMINATION

8.1 Non-liability of City Officers and Employees. No officer or employee of City shall be personally liable to Consultant, or any successor in interest, in the event of any default or breach by City or for any amount which may become due to Consultant or to its successor, or for breach of any obligation of the terms of this Agreement.

8.2 Conflict of Interest. Consultant covenants that neither it, nor any officer or principal of its firm, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Consultant’s performance of services under this Agreement. Consultant further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent or subcontractor without the express written consent of City. Consultant agrees to at all times avoid conflicts of interest or the appearance of any conflicts of interest with the interests of City in the performance of this Agreement. City, in its sole discretion, shall determine the existence of a conflict of interest and may terminate this Agreement in the event such a conflict of interest exists upon sending Consultant written notice describing the conflict. No officer or employee of City shall have any financial interest, direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating to this Agreement which affects their financial interest or the financial interest of any corporation, partnership or association in which they are, directly or indirectly, interested, in violation of any State statute or regulation. Consultant warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement.

8.3 Covenant Against Discrimination. Consultant covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry or other protected class in the performance of this Agreement. Consultant shall take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry or other protected class.

ARTICLE 9. MISCELLANEOUS PROVISIONS

9.1 Notices. Any notice or other communication either Party desires or is required to give to the other Party or any other person in regards to this Agreement must be in writing and may be given either by (i) personal service, (ii) delivery by a reputable document delivery service, such as but not limited to, Federal Express, which provides a receipt showing date and time of delivery, or (iii) mailing in the Uni ted States Mail, certified mail, postage prepaid, return receipt requested, in the case of City addressed to City Clerk at City of Murrieta, 1 Town Square, Murrieta California 92562, and in the case of Consultant, to the person(s) at the address designated on the cover page of this Agreement. Either Party may change its address by notifying the other Party of the change of address in writing. Notice shall be deemed communicated at the time personally delivered or in seventy- two (72) hours from the time of mailing if mailed as provided in this Section.

9.2 Interpretation. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either Party by reason of the authorship of this Agreement, headings used, or any other rule of construction which might otherwise apply.

9.3 Counterparts. This Agreement may be executed in counterparts, each of which shall be deemed an original, and such counterparts shall constitute one and the same instrument.

9.4 Integration; Amendment. This Agreement including the attachments hereto is the entire, complete and exclusive expression of the understanding of the P arties as to the Agreement . It is understood that there are no oral agreements between the Parties hereto affecting this Agreement, and this Agreement supersedes and cancels any and all prior and contemporaneous negotiations, arrangements, agreements and understandings, if any, between the Parties , concerning this Agreement, and none shall be used to interpret this Agreement. No amendment to or modification of this Agreement shall be valid unless made in writing and approved by Consultant and by City.

9.5 Severability. Should a portion of this Agreement be declared invalid or unenforceable by a judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining portions of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the Parties unless the invalid provision is so material that its invalidity deprives either Party of the basic benefit of their bargain or renders this Agreement meaningless.

9.6 No Undue Influence. Consultant declares and warrants that no undue influence or pressure was used against or in concert with any officer or employee of City in connection with the award, terms or implementation of this Agreement, including any method of coercion, confidential financial arrangement, or financial inducement. No officer or employee of City has or will receive compensation, directly or indirectly, from Consultant, or from any officer, employee or agent of Consultant, in connection with the award of this Agreement or any work to be conducted as a result of this Agreement. Violation of this Section shall be a material breach of this Agreement entitling City to remedies in Section 7.4 and any and all remedies at law or equity.

9.7 Corporate Authority. The persons executing this Agreement on behalf of the Parties hereto warrant that (i) such Party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said Party , (iii) by so executing this Agreement, such Party is formally bound to the provisions of this Agreement, and (iv) entering into this Agreement does not violate any provision of any other agreement to which said Party is bound. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the Parties.

9.8 Federal Funding. If federal funding is being utilized to fund any part of the Project, as indicated on the Cover Page of this Agreement, the terms of Exhibit “E” are hereby incorporated herein by this reference. If no federal funding is being utilized, Exhibit F may be omitted.
[
SIGNATURES ON FOLLOWING PAGE]
01375.0001 962082.4 -15 -
IN WITNESS WHEREOF, the Parties hereto have executed this Agreement on the date and year first-above written.

CI
TY OF MURRIETA ATTEST:

By:_____________________________ By:_____________________________ Jon Levell, Mayor Cristal McDonald, City Clerk
Date: ___________________________ Date: ___________________________

APPROVED AS TO FORM
A

LESHIRE & WYNDER, LLP
B
y: ____________________________
T
iffany Israel, City Attorney
CO
NSULTANT:

B
y:_____________________________ By:_____________________________ Name: Brendan Hastie Name: Tim Gabrielson
Title: Vice President Title: Corporate Secretary
Date: ___________________________ Date: ___________________________ Two corporate officer signatures required when Contractor is a corporation, with one signature required from each of the following groups: 1) Chair person of the Board, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer. (Cal. Corp. Code § 313.) Appropriate attestations shall be included as may be required by the bylaws, articles of incorporation or other rules or regulations applicable to Contractor’s business City.

01375.0001 962082.4
EX

HIBIT A
S

COPE OF SERVICES
I. Consultant will perform the following Services:

The Consultant shall provide all professional, technical, and administrative services necessary to prepare a comprehensive Citywide Storm Drain Master Plan (SDMP) for the City of Murrieta. Services include full project management; coordination with City st aff; preparation of schedules; progress reporting; QA/QC; participation in public, commission, and City Council meetings; and complete file and data management. The Consultant shall research, compile, and verify all available drainage‑related data; develop a unified GIS‑based inventory of the City’s storm drain infrastructure; digitize and incorporate as‑built plans; identify missing or incorrect data; perform field verification as needed; and produce a model‑ready GIS geodatabase with feature attributes, connectivity, metadata, and confidence levels. The Consultant shall prepare basin delineations and conduct hydrologic and hydraulic analyses in accordance with RCFC & WCD methodologies, developing a 1D/2D model reflecting existing conditions, overland flow, and MS4 system performance for required storm events. Using model results, the Consultant shall identify system deficiencies; determine required improvements and associated sizing; identify missing or recommended new conveyance facilities; and evaluate mu lti‑benefit and regional opportunities. The Consultant shall develop prioritized near‑term and long‑term capital improvement recommendations supported by cost estimates, prioritization scoring, and identification of potential local, state, and federal funding sources. The Consultant shall prepare a Draft and Final Storm Drain Master Plan including all required exhibits, maps, technical documentation, and GIS/model files, and shall provide a web‑based GIS viewer for City use. The Consultant shall also prepare a memorandum outlining best practices and recommendations for ongoing operation, maintenance, and inspection of the City’s storm drain assets. Optional services may include CCTV inspection of selected facilities and additional as‑built digitization, if requested by the City.

II. All work product is subject to review and acceptance by the City, and must be revised by the Consultant without additional charge to the City until found satisfactory and accepted by City.

RICK ENGINEERING COMPANY TOTAL
Labor Classification
Principal
Associate/
Manager
Principal Project
Engineer/Manager
Associate Project
Engineer/Manager
Principal Water
Resources Designer
Associate Water
Resources Designer
Assistant Water
Resources Designer
GIS Asset Manager
GIS Programmer
Grant
Writing/Funding
Specialist
Task Billing Rates $300 $260 $240 $220 $175 $160 $145 $200 $180 $180 TASK 1. PROJECT MANAGEMENT, MEETINGS, AND COORDINATION

1.1 Project Kickoff Meeting 2 8 2 2 $3,440 $3,440 $0 $3,440

1.2 Progress Meetings (Assumes 9 meetings) 4 18 $5,880 $5,880 $5,880

1.3 Agendas and Meeting Minutes 18 $4,680 $4,680 $4,680

1.4 Public and Council Meetings (Assumes 2 Meetings) 4 6 8 20 8 12 4 $12,360 $12,360 $12,360

1.5 Project Tracking and File Management 15 20 $7,900 $7,900 $0 $7,900

1.6 Quality Assurance/Quality Control 4 30 $9,000 $9,000 $0 $9,000 Task 1 Sub-Total 14 95 8 0 0 20 0 30 12 6 $43,260 $0 $43,260 $0 $43,260 TASK 2.RESEARCH, DATA COLLECTION, AND COMPILATION

2.1 Compile Available Drainage System Data 8 8 2 20 24 24 20 10 $21,060 $21,060 $0 $21,060

2.2 Existing Infrastructure Digitization and As-Built Verification 4 4 120 50 20 20 $35,890 $35,890 $35,890

2.3 Identify Critical Missing or Incorrect Data 8 8 10 20 10 10 10 $14,200 $14,200 $14,200

2.4 Identify Missing Infrastructure 8 4 30 10 $9,290 $9,290 $9,290

2.5 Confidence-Based Field Validation 8 8 12 80 10 10 $23,240 $420 $23,660 $0 $23,660

2.6 Compile GIS Data and Assemble Inventory Database 4 30 20 $10,640 $10,640 $0 $10,640 Task 2 Sub-Total 0 36 32 18 30 274 94 90 70 0 $114,320 $420 $114,740 $0 $114,740 TASK 3. EXISTING CONDITION HYDROLOGIC AND HYDRAULIC ANALYSIS AND

MODELING

3.1 Compile Hydrologic Data and Generate Subcatchments (Assumes 2100 Subcatchments) 2 4 16 24 40 100 80 40 20 $56,960 $56,960 $0 $56,960

3.2 Existing Condition Hydrologic and Hydraulic Model 2 8 16 24 80 180 140 20 $78,500 $78,500 $0 $78,500 Task 3 Sub-Total 4 12 32 48 120 280 220 40 40 0 $135,460 $0 $135,460 $0 $135,460 TASK 4. RECOMMENDED IMPROVEMENTS (CIP DEVELOPMENT)

4.1 Identify Existing Deficiencies and Improvements 1 20 20 30 30 80 80 20 20 $54,150 $54,150 $0 $54,150

4.2 Identify Missing Proposed Improvements 2 12 12 18 30 80 40 $34,410 $34,410 $34,410

4.3 Identify Multi-Benefit and Water Quality Opportunity Sites 4 14 10 6 $7,070 $7,070 $7,070

4.4 Prepare Opinion of Probable Construction Costs 4 6 30 30 $11,630 $11,630 $11,630

4.5 Prioritize Improvements Using a Scoring Matrix 1 12 8 12 10 20 30 $17,280 $17,280 $0 $17,280

4.6 Identify Funding Source 8 80 $16,480 $16,480 $0 $16,480 Task 4 Sub-Total 4 60 46 74 80 210 180 26 20 80 $141,020 $141,020 $0 $141,020 TASK 5. DEVELOP THE STORM DRAIN MASTER PLAN

5.1 Compile GIS and Modeling Results into Web-Based Viewer 4 8 32 16 $12,240 $12,240 $0 $12,240

5.2 Prepare Draft Storm Drain Master Plan 2 16 24 12 16 16 8 10 10 $23,240 $23,240 $0 $23,240

5.3 Final SDMP 2 12 8 8 12 12 4 $11,780 $11,780 $11,780

5.4 O&M Best Practices Memo 2 8 16 14 12 12 $13,260 $13,260 $0 $13,260 Task 5 Sub-Total 6 40 56 34 0 40 40 40 30 10 $60,520 $0 $60,520 $0 $60,520 OPTIONAL TASK A – CCTV FIELD INSPECTIONS
A.1 CCTV Inspection and PACP Condition Grading (10 Days Assumed) 4 8 10 20 $8,400 $8,400 $30,000 $38,400 OPTIONAL TASK B – ADDITONAL AS-BUILT PLAN DIGITIZATION
B.1 Additional As-Built Data Digitization (T&M NTE) 4 8 80 80 20 $31,200 $31,200 $31,200 Optional Tasks Sub-Total 0 8 0 16 0 90 80 40 0 0 39,600 0 39,600 30,000 69,600 Total Project Hours 28 243 174 174 230 824 534 226 172 96 Total Project Hours (w/ Optional Tasks) 28 251 174 190 230 914 614 266 172 96 Total Project Cost (w/ out Optional Tasks) $8,400 $63,180 $41,760 $38,280 $40,250 $131,840 $77,430 $45,200 $30,960 $17,280 $494,580 $420 $495,000 $0 $495,000 Total Project Cost (w/ Optional Tasks) $8,400 $65,260 $41,760 $41,800 $40,250 $146,240 $89,030 $53,200 $30,960 $17,280 $534,180 $420 $534,600 $30,000 $564,600 Total Cost
Cost Loaded Work Plan

CITY OF MURRIETA
Professional Engineering Services for the City of Murrieta Storm Drain Master Plan RICK Labor Cost
Reimbursable
Expenses
RICK Total Cost
Optional CCTV
Partner

QUALIFICATIONS TO PROVIDE
Consultant Services for a Storm
Drain System Master Plan
F or the City of Murrieta
Pr oject No. 21-446 / CIP 19002
N ovember 19, 2025
/ 5620 Friars Road, San Diego, CA 92110
/ (619) 291-0707
/ RICKENGINEERING.COM
1 November 19, 2025
City of Murrieta
Attn: Josh Forhman, PE, Associate Civil Engineer
1 Town Square
Murrieta, CA 92562
SUBJECT: Qualifications for Consultant Services for a Storm Drain Master Plan Dear Mr. Fohrman,
RICK Engineering Company (RICK) is pleased to submit our Statement of Qualifications to prepare the City of Murrieta’s Storm Drain Master Plan (SDMP). RICK has supported the City for many years, and our team brings unmatched familiarity with local drainage issues, regional hydrology, and the infrastructure needs of rapidly developing communities across Southwest Riverside County.

Our approach aligns directly with the RFQ requirements and emphasizes clear communication, defensible analysis, and practical implementation. As a true one-stop-shop, RICK will complete all GIS, modeling, asset verification, and QA/QC in-house, ensuring consistency, reducing coordination cost, and avoiding the fragmented subcontracting approach. This integrated structure provides Murrieta with a streamlined delivery team and a single point of accountability throughout the project.

Our proposed Implementation Approach focuses on:
• A model-ready GIS inventory with confidence tracking to support long-term maintenance and lifecycle asset management
• A combined 1D/2D hydrologic and hydraulic model to capture system performance, overland flow, and provide visual results that significantly improve the communication value of the model results • A prioritized, funding-focused CIP program aligned with regional and state grant opportunities • A web-based GIS viewer so City staff can easily access, visualize, and communicate SDMP results RICK Engineering Company is a California corporation located at 5620 Friars Road, San Diego, CA 92110. We have reviewed and acknowledge Addenda 1, 2, and 3 posted on PlanetBids.

Please contact Andrew Thies at (619) 688-1454 [email protected] or Brendan Hastie, P.E. at (619) 204-5979 [email protected] with any questions.

Thank you for your time and consideration. We appreciate the opportunity to continue our partnership with the City of Murrieta through this important project.

Thank you for your consideration.

Sincerely,
Andrew Thies, CFM Brendan Hastie, PE, LEED AP
Project Manager Principal In Charge

1. Transmittal Letter

2 2. Table of Contents

3. Executive Summary
The City is seeking a highly qualified professional consultant to develop a Storm Drain Master Plan. RICK has the leadership to provide the best service and qualifications to support the plan development. This statement of qualifications was structured to match the major sections listed in the RFQ and below is the concise synopsis starting with Section 4:

4. Introduction: Highlights the extensive experience RICK brings in supporting local jurisdictions with Strom Drain Master Plans.

5. Company Background: Provide company background for RICK.

6. Project Management: Project management approach will be based on four critical elements (coordination; project planning and scheduling; cost control; and QA/QC program) and continuous improvement.

7. Staff: The strongest asset of our team is the key team members we have assembled. This section summarizes the qualifications and experience of the staff.

8. Qualifications and References: This section provides project descriptions and references from four projects that are comparable to the services requested in this City contract and demonstrate quality, results-driven work over the past five years.

9. Fee Proposal: Per the RFP, the fee proposal is included under a separate cover.

10. Anticipated Project Schedule: Provides an anticipated schedule of 15 months which includes a one-month buffer.

11. Implementation Approach: Summarizes the proposed approach including scope of work, efforts needed to ensure a successful project, possible solutions to support a successful delivery of the project, list of deliverables and assumption made in development of the schedule and work plan.

12. Additional Information: Acknowledges the addenda and a completed statement of compliance form.

SECTION PAGE SECTION PAGE

1. Transmittal Letter and Statement of
Understanding and Approach
1 7. Staff 6

2. Table of Contents 2 8. Qualifications and References 8

3. Executive Summary 2 9. Fee Proposal (separate document) --

4. Introduction 3 10. Anticipated Project Schedule 12

5. Company Background 4 11. Implementation Approach 13

6. Project Management 5 12. Appendix - Additional Information 3 4. Introduction
RICK Engineering Company (RICK) is a California-based civil engineering and water resources firm with over two decades of experience preparing Storm Drain Master Plans, drainage studies, and GIS-based infrastructure inventories for jurisdictions throughout the region. Our portfolio includes work in Menifee, Paso Robles, Tustin, San Marcos, Carlsbad, Lemon Grove, and the City and County of San Diego, projects similar in scope and complexity to the City of Murrieta’s Storm Drain Master Plan. These efforts, shown on the accompanying Experience Map, demonstrate our ability to support municipalities with basin planning, hydrologic and hydraulic modeling, GIS modernization, and CIP development.

RICK offers the City a team that is already familiar with Murrieta’s drainage system, data environment, and local hydrology.

Our previous support to the City positions us to begin work efficiently, reduce onboarding time, and focus on the technical components that will have the greatest long-term value. Because our hydrology, hydraulics, GIS, asset management, and CIP specialists work together in-house, all inventory development, modeling, QA/QC, and analysis for this project will be performed internally. This integrated approach ensures consistency, predictable schedules, and high-quality technical review without reliance on external subconsultants.

Our qualifications align directly with the needs of this SDMP. RICK has extensive experience developing model- ready drainage inventories with confidence tracking; completing 1D/2D hydrologic and hydraulic models for citywide infrastructure systems; identifying and sizing systemwide deficiencies; preparing funding-focused CIP recommendations; and delivering GIS-centered tools that help City staff maintain, update, and communicate drainage information effectively.

These capabilities support the City’s goals for an implementable, technically defensible, and easily maintainable Storm Drain Master Plan completed in a timely manner.

RICK is committed to continuing our partnership with the City of Murrieta by delivering an SDMP that provides clear insight into system performance, practical recommendations, and tools to support long-term infrastructure planning and funding.

4 Firm Background
RICK is a local multidisciplinary engineering, landscape architecture, and planning firm known throughout the Western United States for providing high-quality service and value to clients for 70 years. Our company’s broad array of engineering disciplines allows us to provide comprehensive services that can be managed in-house to assure optimum project quality and efficiency.

RICK’s Water Resources Department provides comprehensive storm water solutions for public works and land development, guiding projects from the planning phase through the entitlement process, final design, and construction. As experts in water resource analysis and planning for more than 40 years, our team offers a wide range of experience in stormwater management, including surface runoff modeling, flood control design, hydraulic and sediment transport analyses, urban drainage design, FEMA floodplain mapping and processing, GIS master planning, and stormwater quality modeling and design.

Many of our clients face a complex regulatory environment, including drainage, water quality, and floodplain-related constraints. Our expert engineers are well-versed in local, state, and federal water resources requirements and are able to guide clients through the process. We deploy state-of-the-art technologies to assist with data analysis, modeling, and design. We provide smart solutions for complex issues.

Personnel Summary
Brendan Hastie, PE, LEED AP, will serve as Principal in Charge and Andrew Thies, CFM, will serve as Project Manager. Brendan Hastie, Andrew Thies, and Venkat Gummadi have ownership positions at RICK and will be supporting this project.

RICK Revenue and Profit
As requested in the RFQ, the following chart outlines RICK’s annual company revenues and profit for the last three fiscal years.

NOTE: Profit reflects earnings before discretionary expenses and income tax provision.

FIRM
Rick Engineering Company
(RICK)

LOCATION OF OFFICES
San Diego (HQ)
Riverside
Orange
San Luis Obispo
Santa Clarita
Sacramento
Las Vegas
Phoenix
Tucson
Arvada
Centennial

OFFICE TO SERVE CITY
San Diego (HQ)
5620 Friars Road
San Diego, CA 92110

FISCAL YEAR REVENUE/SALES PROFIT/(LOSS)
2022 66,322,721 8,612,285
2023 69,277,737 2,622,938
2024 76,765,837 1,936,560

5. Company Background
CO
Santa Clarita
Irvine
San Diego
Tucson
Riverside
Las Vegas
CA
NV
AZ
Sacramento
Phoenix
Arvada
Centennial
San Luis Obispo
5 We understand the importance of providing close individual attention to each project and to working within the constraints of time and budget. Our management approach is based on years of successful project experience on similar projects in the region and for the City. Our approach will be based on five critical elements and continuous improvement:

Communication and Coordination
Communication and coordination with City staff will be
key in meeting the City’s project goals. The success
of our project performance is a result of our close
communication and coordination with our public agency
clients. We have specific protocols to ensure the chain of communication between the City, the team, cooperating
public agencies, and the project stakeholders, is
established early and actively maintained throughout the project life cycle. In his role as Project Manager, Andrew Thies, CFM, will be responsible for establishing and
maintaining all project management procedures. Principal- in-Charge, Brendan Hastie, PE, LEED AP, will support
Andrew, as needed, in implementing our established
procedures and providing any needed resources to the
project.

Project Planning, Scheduling, and Schedule
Reporting Software
Detailed planning at the beginning of the project is
essential to reduce risk, ensure quality, and maintain
schedule and budget. As part of our proven planning
and scheduling practice, Andrew will formalize a Work
Plan at the outset of the project. This Work Plan will
include project scope tasks, budgets, and deliverables
as well as the responsible parties for each item. In
addition to delivering it to the City, Andrew will distribute and review the Work Plan with team members to ensure
understanding and compliance. He will create a detailed schedule using Microsoft Project to organize the overall project tasks and budget and track actual versus
scheduled work and costs. The detailed Microsoft Project schedule will be shared during the kick-off meeting.

Cost Control
Successful project management requires accommodating
project adjustments while maintaining budget and
schedule. Andrew will continuously monitor the activities of the project team, tracking actual progress versus
budgeted costs. Should deviations occur, he will take
immediate corrective action. To facilitate this effort, RICK will use Deltek Advantage to track expenditures,
including both labor and direct costs, on a weekly and
long-term basis. Up-to-date information is available to the Project Manager at all times, and progress reports will be included with each monthly invoice for City review and
approval.

Quality Assurance / Quality Control
RICK promotes a continuous emphasis and commitment
to quality control through all phases of its projects. These practice standards must conform to the expectations of
our clients, the engineering industry, public agencies, and the community. This is facilitated by attention to
the company’s manual on quality control standards,
periodic quality control seminars, and staff performance reviews throughout the company. These measures are
applied to all levels of work, including project scheduling, documentation, plan preparation, and field survey.

For this project, Quality Control Review will not only be a continuous effort led by our Project Manager and design team, but assured by Venkat Gummadi, PE, QSD/P,
CPESC, our QA/QC Manager, throughout the project
duration. By using this process, all deliverables will be subject to internal reviews prior to submittal to the City.

6. Project Management
6 7. Staff
A. Organizational Chart
A well-organized team, with a clear division of responsibilities is essential to successful delivery of any project. The organizational chart presented below delineates the project tasks that each key team member will be responsible for and the reporting/communication structure within the team.

Serving as the Primary Contact, our Project Manager,
Andrew Thies, CFM, will have full responsibility for meeting this project’s requirements, on time and within budget.

All proposed staff are RICK employees, unless otherwise noted.

Resumes for staff members with asterisks are
provided in the Appendix.

Our proposed team’s collaborative experience fosters
better communication, a shared understanding of roles
and responsibilities, and the ability to anticipate challenges, ultimately leading to more effective collaboration and a successful project outcome.

PROJECT MANAGER:

Andrew Thies CFM*

QA /QC MANAGER &
TECHINCAL ADVISOR:

Venkat Gummadi PE, QSD/P , CPESC*

WATER RESOURCES
ENGINEERING:

Kevin McKinnon PE*
Lukas Thompson PE*
Bavya Vuppalapati EIT*
Callum McRae EIT*
Chris Mattox PE*
Daniel Angel EIT

GIS / ASSET
MANAGEMENT:

Mikala Randich *
Mario Terrazas
Ben Alonzo

FUNDING & FEE
STRATEGIES:

Sydney Rankmore *
PRINCIPAL-IN-CHARGE:

Brendan Hastie PE, LEED AP*
RICK has proven experience in completing major projects and tasks for numerous, local agencies. Our staff has
worked on many relevant projects/tasks and has a proven track record of producing quality products that are on
schedule and meet the client’s needs. The following list provides a sampling of RICK’s current local Southern
California clients.

Our proposed work plan to sucessfully deliver this project is presented in Section 11 and proposed schedule is
presented in Section 10. This project work will be executed from RICK’s San Diego office.

Current Client List
» City of San Diego
» County of San Diego
» City of Murrieta
» City of Menifee
» City of Tustin
» City of Paso Robles
» City of Riverside
» Riverside County Flood Control and Water
Conservation District (RCFC&WCD)
7 Name Role Certifications Highest Degree Years of
Experience
Key Personnel
Venkat Gummadi QA/QC Manager & Technical
Advisor

PE, CPESC,
QSD/P MS, Civil Engineering 17
Brendan Hastie Principal-in-charge PE, LEED AP BS, Civil Engineering 25 Andrew Thies Project Manager EIT, CFM BS, Civil Engineering 11 Kevin McKinnon Water Resources Engineering PE, QSP/QSD MBA, BS, Civil Engineering 11 Lukas Thompson Water Resources Engineering PE, QSD/P BS, Civil and Environmental Engineering 10
Bavya Vuppalapati Water Resources Engineering EIT MS, Water Resources 9 Callum McRae Water Resources Engineering EIT BS, Environmental Engineering 3
Chris Mattox Water Resources Engineering PE BS, Environmental Engineering 11
Mikala Randich GIS / Asset Management CSPR SC BS, Environmental Science 8 Sydney Rankmore Funding & Fee Strategies RPP MCIP MS, Community and Regional Planning 6
Additional
Support Staff
Mario Terrazas GIS / Asset Management - - 28
Ben Alonzo GIS / Asset Management GISP MS, GIS 15
Daniel Angel Water Resources Engineering EIT BS, Civil Engineering 1 Total Hours
Brendan Hastie
Venkat Gummadi
Andrew Thies
Kevin McKinnon
Lukas Thompson
Bavya Vuppalapati
Callum McRae
Chris Mattox
Mikala Randich
Sydney Rankmore
Mario Terrazas
Ben Alonzo
Daniel Angel
Task 1 - Project Management 185 4% 4% 51% 4% 0% 0% 11% 0% 8% 3% 8% 6% 0% Task 2 - Research, Data
Collection, and Compilation 648 0% 0% 6% 4% 1% 5% 43% 1% 8% 0% 8% 9% 15% Task 3 - Existing Condition H&H
Analysis & Modeling 796 0% 1% 2% 4% 3% 15% 35% 3% 3% 0% 3% 5% 28% Task 4 - Recommended
Improvements 780 0% 1% 8% 6% 5% 10% 27% 5% 2% 10% 2% 3% 23% Task 5 - Develop SDMP 296 1% 1% 14% 19% 6% 0% 14% 6% 7% 3% 7% 10% 14% Optional Task A- CCTV Field Insp. 42 0% 0% 10% 0% 10% 0% 24% 10% 24% 0% 24% 0% 0% Optional Task B- Add’l As Built
Plan Digitization 192 0% 0% 2% 0% 2% 0% 42% 42% 5% 5% 0% 0% 0% The matrix below shows the effort in percentage of total in person-hours, that will be contributed by each professional, during each phase and the overall project.

B. Staff Experience and Effort Matrices
The table below shows the qualifications and experience of professionals selected to support the City on this project. It includes both key personnel and additional support staff. 8 8. Qualifications and References

PROJECTS
CALIF0RNIA MUNICIPALITIES SCOPE
Menifee Drainage Master Plan | City of Menifee *      Lemon Grove Drainage Master Plan | City of Lemon Grove *      Carlsbad Drainage Master Plan | City of Carlsbad *       Tustin Storm Drain Master Plan | City of Tustin *     Waterway Naturalization Study | City of Agoura Hills      Drainage Master Plan Update | City of Paso Robles       Downtown Watershed Plan | City of Atascadero       Rainbow Creek Watershed Implementation Plan | County of San Diego      Multiple Watershed Master Plans | City of San Diego      San Marcos Drainage Master Plan | City of San Marcos      El Cajon Citywide Drainage Master Plan | City of El Cajon      GIS Drainage Master Plans for SDA 1, 3, 7, 8, 10 | County of San Diego       South Mission Beach Watershed Master Plan | City of San Diego      Encinitas Creek Drainage Master Plan | City of Encinitas      Vista Drainage Master Plan | City of Vista     
Ocean Beach Drainage Master Plan | City of San Diego      Gonzales Drainage Master Plan | City of Gonzales      East Otay Mesa Drainage Master Plan | County of San Diego     Eden Valley Drainage Master Plan | County of San Diego     Seeley Drainage Master Plan | Imperial County      * Detailed project descriptions provided on following pages.

The following pages provide project descriptions for three projects which are comparable to the services requested in this City contract and demonstrate quality, results-driven work over the past five years. We have selected projects that demonstrate our technical expertise, as well as our history of timely, budget-sensitive delivery. All projects were completed on time and within budget.

We encourage you to contact the referenced clients
for further information regarding our qualifications and experience.

Additionally, RICK has received no claims for errors and omissions relative to municipal Strom Drain Master Plan projects over the last ten years.

With decades of directly related project experience and comprehensive in-house water resources capabilities, we present unique benefits to the City. Our Water Resources Division staff includes well-known specialists in hydrology and hydraulics, with wide-ranging experience in preparing SDMPs, storm drain design, and integrating GIS services to enhance the value of storm drain inventories and analyses.

We have provided similar services for a variety of local municipalities and public agencies, including the Cities of Menifee, Carlsbad, San Marcos, Lemon Grove, El Cajon,
Encinitas, San Diego, and County of San Diego.

The following matrix provides an overview of RICK’s SDMP experience in California. Detailed project descriptions are also provided for a subset of projects. These projects
consist of nearly identical services to those expected
by the City. Each design team remained unchanged
throughout the project. This project history demonstrates our ability to deliver high-quality services with a cohesive team of professionals and our proven ability to provide all services required for the SDMP.

PROJECT MANAGEMENTRESEARCH|DATA COLLECTION H&H ANALYSIS |MODELINGRECOMMENED IMP.| CIP DEV.CIP FUNDING ANALYSISDEVELOP SDMP 9 CITY OF MENIFEE: 29844 HAUN ROAD MENIFEE, CA 92586
Master Drainage Plan and Culvert
Inspections Program
CITY OF TUSTIN: 300 CENTENNIAL WAY, TUSTIN, CA 92780
Storm Drain Master Plan: 2025
RICK prepared a comprehensive Citywide Master
Drainage Plan integrating a fully connected,
GIS-based storm drain inventory and 1D/2D
hydrologic and hydraulic modeling consistent
with RCFC&WCD methodologies. Extensive
GIS data development was performed including
digitizing as-builts, correcting connectivity, and
verifying field data that enabled the production
of an accurate, hydraulically linked system.

The model identified capacity deficiencies,
informed recommended improvements, and
defined regional opportunities for multi-benefit
(flood control/water quality) projects.

Coordination with RCFC&WCD ensured
consistency with City and County standards,
region-specific design criteria, and regional
drainage plans. Recommendations were
bundled into implementable projects with
preliminary cost estimates, supporting both
5-year and 20-year Capital Improvement
Program (CIP) planning. All deliverables were
provided through an interactive, GIS-centered
web application, allowing the City to visualize
existing conditions, proposed improvements,
and project priorities for long-term stormwater
infrastructure management.

RICK is assisting the City of Tustin in preparing a comprehensive Storm Drain Master Plan to analyze the City’s existing drainage infrastructure. The effort requires the development of a city-wide GIS inventory of drainage facilities for both City- and County-owned facilities. A standardized GIS data schema, developed with City staff input, was created that ensures consistency across the municipalities in the region.

Building on verified inventory data, RICK is developing an inspection prioritization matrix that considers facility type, age, size, and location to guide planned CCTV inspections and targeted field verification.

The project will result in a fully connected GIS storm drain network, including inventory confidence and condition assessment mapping, to identify areas requiring additional inspection or field verification.

Once the system is fully connected, a dual-drainage hydrologic and hydraulic (H&H) model will identify deficiencies under existing and future build-out conditions for the 2-, 10-, 25, and 100-year storm events. Model results, combined with inspection findings, will inform development of future CIP projects. The team will also explore funding strategies and grant opportunities to support implementation and ensure long-term system resilience.

CLIENT
City of Menifee

CONTACT INFORMATION
Run Chen, PE, PMP
Senior Engineer, Public Works
(858) 495-5257
COMPLETED COST *
$711,000

ESTIMATED COST PRIOR TO

CONTRACTING
$668,000

KEY STAFF
Brendan Hastie, PE, LEED AP
PIC
Andrew Thies, CFM
Project Manager
* PRICES REFLECT BOTH

PROJECTS
CLIENT
City of Tustin

CONTACT INFORMATION
Alex Waite
Senior Management Analyst
(714) 573-3305

COMPLETED COST
N/A

ESTIMATED COST PRIOR TO

CONTRACTING
$692,000

KEY STAFF
Brendan Hastie, PE, LEED AP
Principal In Charge
Andrew Thies, CFM
Project Manager
Drainage Conveyance & Deficiency Mapping
CIP Project Identification
10 CITY OF CARLSBAD: 1635 FARADAY AVENUE, CARLSBAD, CA 92008 Drainage Master Plan Update: 2024
RICK prepared a citywide DMP to
assess existing drainage deficiencies
in the City’s infrastructure and provide
recommendations to improve the
stormwater conveyance system.

Recommendations focused on large-scale
storm drain CIP projects, and potential
regional improvements opportunities for
stormwater detention and water quality.

A fiscal & fee analysis was also prepared to inform revisions to the City’s existing development impact fee program.

RICK assessed drainage components by creating detailed H&H models using high-resolution geospatial datasets. The drainage analysis focused on the public drainage infrastructure system, including pipes, culverts, open channels, and inlets. Development of detailed H&H models using a dual drainage approach to estimate 1D conveyance capacity of surface and subsurface systems for the 2, 10, and 100-Year (24-Hour) storm events. A 2D model approach was performed at drainage “hot spot” locations and regions with very flat topography to create a detailed visual representation of surface flow routing, split flow conditions, surface storage, and flow attenuation within areas of concern.

CONTACT INFORMATION
David Edwards, MS, PE, CFM
Senior Engineer
(760) 271-7147

COMPLETED COST
$1,010,000

ESTIMATED COST PRIOR

TO CONTRACTING
$945,000

KEY PERSONNEL
Brendan Hastie, PE, LEED AP
Project Manager/PIC
Andrew Thies, CFM
Deputy Project Manager
CITY OF LEMON GROVE: 3232 MAIN STREET LEMON GROVE, CA 91945 Drainage Master Plan: 2020
RICK assisted the City in successfully
leveraging Senate Bill 1 (SB1) funding to
address sinkholes and failing infrastructure
caused by deteriorating CMP storm drains
and recurring flooded areas, in order to
support the planning, design, funding, and
implementation of future CIP projects.

RICK assessed the drainage components of
the DMP by utilizing high-resolution spatial
datasets to generate detailed H&H models. A holistic modeling program was used to prepare models for multiple storm events for over five square miles of the City. The models used a dual drainage approach, which allowed for dynamic interaction between the 2D surface routing, storage, detention (above and below ground), and 1D pipe flow, to provide a finely detailed model of the study areas drainage infrastructure.

The project included identifying areas for potential future projects to provide detention and/or water quality benefits. The City’s CMP storm drains were graded based on a rating system that assigned each pipe with a repair priority and repair techniques were recommended for each length of pipe. The comprehensive assessments of the network resulted in a list of prioritized, site-specific, bundled, implementation-ready projects for City officials to reference in order to advance the watershed management goals of the City.

CONTACT INFORMATION
Mike James, Assistant City Manager
*previously at City of Lemon Grove now
at City of Encinitas
(760) 633-2795

COMPLETED COST
$299,000

ESTIMATED COST PRIOR TO

CONTRACTING
$299,000

KEY STAFF
Brendan Hastie, PE, LEED AP
Project Manager/PIC
Andrew Thies, CFM
Deputy Project Manager

11 KEY POTENTIAL

CHALLENGES RICK SOLUTION/BENEFIT WHERE WE HAVE DONE THIS BEFORE Unclear project
objectives that
jeopardize City
Council approval
Utilize the kick-off meeting to review
recently completed master plans with
various objectives to establish clear
goals and intentions ensuring a
successful project for all parties.
» City of Lemon Grove
DMP
» City of San Marcos
DMP
» City of El Cajon DMP
Fragmented and
outdated storm
drain data
Compile available GIS, ADP/MDP, as-
built, and FEMA data into a unified
geodatabase with Confidence Level
tracking. Use a Priority Matrix to focus
verification on high-consequence
trunk mains and crossings. Produce a
Model-Ready inventory that improves
modeling accuracy and lowers long-term
maintenance costs.
» Rainbow Creek WIP
» City of Lemon Grove
DMP
» City of Menifee
» City of Carlsbad DMP
» City of Paso Robles
DMP
Identifying
systemwide
deficiencies and
scalable solutions

Using hydraulic-model results, provide
citywide recommendations for all
deficient pipes and culverts with unit
costs, determine required sizes per
City standards, and coordinate with
staff to select up to 10 representative
projects for further refinement. This
gives the City a holistic understanding
of system needs at low cost.
» City of Tustin SDMP
» City of San Diego
IDEAs
» City of San Diego
WMP
» City of Menifee DMP
» City of Paso Robles
DMP
Developing
actionable and
fundable CIP
recommendations
Translate hydrologic and hydraulic
results into clear, prioritized, grant-
ready projects, supported by a
transparent scoring matrix and
planning-level costs. Identify short-
term and long-term funding strategies
and align eligible projects with
programs such as FEMA BRIC,
CalOES, SRF, IRWM, and regional
partnerships.
» City of Carlsbad
» City of Lemon Grove
DMP
» City of San Marcos
DMP
» County of San Diego
SDA DMPs
» City of Paso Robles
DMP
Integrating
long-term data
management and
staff capacity
Deliver a comprehensive GIS database
and ArcGIS Online Web Viewer, configured
for City use.
» Paso Robles
Downtown Watershed
Plan
» City of Menifee DMP
» Atascadero Downtown
Watershed Plan
» Port of San Diego
» City of Paso Robles
DMP
Potential Challenges & Solutions
Potential challenges, our proposed solutions, and our experience addressing similar challenges for other clients are presented in the table below.

10. Anticipated Project Schedule
The below table reflects the anticipated project schedule, showing all work tasks included in the scope of work, as well as the estimated duration to complete each task, with estimated start/finish dates. We plan to present a detailed Microsoft Project Schedule that will breakdown the schedule at a subtask level during the kick-off meeting and will make necessary adjustments based on feedback from City staff within five (5) business days from the kick-off meeting.

9. Fee Proposal
Per the RFQ instructions, fee proposal is provided under separate cover. 12 2026 2027
Task
Number Task Name Duration Key Milestones/Ciy Review Points Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Kickoff Project Kickoff - 2/23/2026 Kickoff meeting & work plan approval 1 PROJECT MANAGEMENT,
MEETINGS, AND COORDINATION Ongoing Monthly coordination meetings, QA/QC checkpoints, progress reports
2 RESEARCH, DATA COLLECTION,
AND COMPILATION 90 Days City review of compiled GIS & record drawings
3 EXISTING CONDITION H&H
MODELING 120 Days
Subcatchment Maps, Modeling Files,
ExistinG Condition H&H Technical Memo
Deliverable: Existing System PCSWMM
Model and Results (Jun 2026)
4 RECOMMENDED

IMPROVEMENTS (CIP

DEVELOPMENT)
120 Days
Identification of Citywide deficient
facilities, Proposed project prioritization,
5-year and 20-year Program
5 DEVELOP THE STORM DRAIN
MASTER PLAN 60 Days
Draft SDMP Submittal, City Review, Final
SDMP, Data Delivery
Deliverable: Draft 1D/2D Model Results
(Feb 2026)
Optional A CCTV INSPECTION 60 Days Optional at City’s request (can run parallel to Tasks 2-3)
PROJECT COMPLETION 30 Days
* Optional Task B will run concurrently with Tasks 2 and 3 of the proposed scope 13 The RICK Team brings decades of experience delivering high-resolution storm drain master plans across California, including recent efforts for the Cities of Tustin, Agoura Hills, Paso Robles, Carlsbad, Lemon Grove, and San Diego. Our
familiarity with Murrieta’s infrastructure, coupled with our technical understanding of regional drainage and permitting requirements, ensures a practical and informed approach.

The map below illustrates Murrieta’s major drainage
systems, FEMA flood zones, key hydrologic features, and jurisdictional boundaries, providing the spatial foundation for field inspections, modeling, and CIP development.

Cole
Canyon
Yode
rCreek
Warm S
pringsCreek
Conduits Segment Count Linear Feet
Main 2,892 147,247
Channel 517 38,658
Lateral 1,524 30,252
Stream 449 116,148
Other 203 6,906
Total 5,585 339,211
Structures Count
Catch Basin 1,854
Inlet 156
Manhole 1,202
Inflow 410
Outflow 512
Detention Basin 32
Total 4,166
15 215
15 Cole
Canyon
Yode
rCreek
Wa
rm Spr
ingsCreek
Conduits Segment Count Linear Feet
Main 2,892 147,247
Channel 517 38,658
Lateral 1,524 30,252
Stream 449 116,148
Other 203 6,906
Total 5,585 339,211
Structures Count
Catch Basin 1,854
Inlet 156
Manhole 1,202
Inflow 410
Outflow 512
Detention Basin 32
Total 4,166
15 15
Cole
Canyon
Yode
rCreek
Warm Sprin
gs Creek
Conduits Segment Count Linear Feet
Main 2,892 147,247
Channel 517 38,658
Lateral 1,524 30,252
Stream 449 116,148
Other 203 6,906
Total 5,585 339,211
Structures Count
Catch Basin 1,854
Inlet 156
Manhole 1,202
Inflow 410
Outflow 512
Detention Basin 32
Total 4,166
15 15

11. Implementation Approach
RICK’s approach is centered on developing a Storm
Drain Master Plan that is directly usable for day-to-day public works decision-making, CIP planning, development review, and maintenance strategy. Because our team has
supported the City of Murrieta across drainage, mapping, and capital planning efforts, and recently delivered a
comparable citywide SDMP for a neighboring Inland
Empire jurisdiction, RICK begin with a clear understanding of regional hydrology, ADP/MDP context, maintenance
practices, and City expectations. This reduces project
startup time, avoids unnecessary rework, and supports
efficient, accurate progress toward City goals.

RICK will deliver:
• A City-maintainable GIS drainage inventory
• A calibrated, transparent hydrologic and hydraulic
model that is RCFC & WCD compliant
• A defensible and fundable CIP prioritized for maximum community benefit
• A Web GIS Viewer and staff training to ensure the
SDMP remains a living, updateable system
This ensures the City receives a plan that supports
implementation, not just documentation.
14 TASK 1: PROJECT MANAGEMENT
Our team will manage this project as an extension of
City staff, emphasizing predictable communication, clear decision-making, and proactive issue resolution.

1.1 Kick-Off Meeting
RICK will conduct a kickoff meeting with City staff at Notice to Proceed to refine goals, confirm data availability, align communication protocols, and finalize the Project Work
Plan with milestones and review cycles.

1.2 Progress Meetings
RICK will conduct regular project progress meetings (virtual or in-person) with City staff to maintain alignment and make timely decisions regarding modeling assumptions,
data needs, CIP prioritization, and public communication materials. Assumes up to nine meetings.

1.3 Agendas and Meeting Materials
Agendas will be distributed at least one business day prior, and meeting summaries with action items will be provided within five business days.

1.4 Public and Council Meetings
RICK will assist and participate in public, commission, and City Council presentations, providing maps, graphics, exhibits, and speaking support to communicate project
outcomes. Assumes up to two meetings.

1.5 Project Tracking and File Management
Monthly progress memorandums, schedule updates, and
invoicing will be provided. All project data, models, GIS files, and supporting documentation will be maintained in a clear directory structure accessible to the City.

1.6 Quality Assurance/Quality Control
QA/QC reviews will be conducted prior to each City
submittal to ensure consistency across GIS inventory,
model conditions, cost estimates, and CIP prioritizations.

Deliverables:
• Project Work Plan and Schedule
• Kick-Off Meeting Materials and Summary
• Progress Meeting Agendas and Minutes
• Monthly Progress Memoranda and Invoices
• QA/QC Review Log (GIS, H&H, and CIP deliverables)
• Public/Council Presentation Support Materials
City Benefits:
• No learning curve: Our long history with Murrieta
eliminates onboarding delays.
• Low City workload: RICK structures communication
and reviews to minimize staff burden.
• Predictability: Transparent schedule and progress
reporting prevents surprises.
• Confidence in outcomes: Built-in QA/QC ensures a
consistent, defensible Plan.
• Better communication to leadership and public: Clear
maps and briefing materials support approvals and
project funding discussions.

TASK 2: RESEARCH, DATA COLLECTION,

AND COMPILATION
This task develops the verified drainage system inventory forming the analytical foundation for hydrology, hydraulics, and CIP development. Murrieta’s system, consisting of
approximately 5,600 pipe and channel segments (≈ 340,000 LF) and 4,000 associated structures, spans multiple ADP basins including Warm Springs, Cole Canyon, and Murrieta Creek. Our approach emphasizes confidence tracking,
prioritization of high-consequence assets, and creation of a model-ready, maintainable GIS dataset that supports future City updates and long-term asset management.

2.1 Compile Available Drainage System Data
RICK will compile available information including ADP/MDP maps, as-built drawings, FEMA mapping, General Plan
land use data, USGS soils and topography, aerial imagery, and existing City GIS layers to establish a unified baseline dataset. Data will be referenced and stored in a format compatible with the City’s GIS environment, including
standardized feature classes, domains, and metadata.

Data sources will include the RCFC&WCD ADPs (Warm
Springs, Santa Gertrudis, and Murrieta Creek), historical master plan data, FEMA FIRM layers, and the City’s GIS
and CAD records. Each dataset will be cataloged with
source date and reliability rating to initiate Confidence Level tracking.

2.2 Existing Infrastructure Digitization and As-Built
Verification
RICK understands the importance of compiling accurate
data for the success of the SDMP project. After a data
request was submitted, the City stated it does not maintain an existing spatial dataset for the City’s storm drain and MS4 features. Through review of publicly available data obtained through City of Murrieta ArcGIS online portal, RICK was able to locate preliminary storm drain infrastructure spatial data that will be leveraged during the digitization efforts. RICK will compile and digitize existing record plans and as-builts to compliment existing data and produce a spatially-connected dataset of the City’s existing drainage infrastructure. Based on responses from the City, an
estimated 90 percent of the system will have available record plans. The digitization efforts will focus on both spatial and non-spatial (geometry, material, size, etc.) data gathered from review of the provided record documents. Datasets

15 will be cataloged with feature source, confidence, as-built date, datum, and other fields as requested through close coordination with City staff and regional partners to ensure compatibility with existing data systems. Digitization efforts will be focused on critical, large diameter infrastructure (36 inches and greater), and facilities with slopes less than 1.0 percent, as presented in available data compiled by RICK.

Assumptions regarding facility depth and invert elevations may be made for smaller diameter facilities with slopes greater than 2.0 percent.

2.3 Identify Critical Missing or Incorrect Data
Based on responses from the City, an estimated 10 percent of the system is missing record plan information, so
identifying crucial facilities lacking appropriate data will be instrumental to project success. RICK will identify missing pipe sizes, invert elevations, materials, and connectivity issues and document each in a Data Gap Matrix that clearly indicates where supplemental research or verification may be warranted. This matrix becomes a communication tool
for both modeling and future asset management planning.

Each data gap will be recorded in a Data Gap Matrix linking specific asset IDs to missing attributes (size, invert, material) and proposed verification method (desktop, field, CCTV).

2.4 Identify Missing Infrastructure
RICK will use aerial imagery, street-level review, and
network tracing to confirm system connectivity and identify unmapped or undocumented storm drain infrastructure
required to complete the system record. Missing or uncertain features will be flagged for classification under Confidence Level ratings.

The team will leverage drainage boundary tracing in GIS to locate discontinuities between mapped and inferred
systems, particularly at jurisdictional interfaces with RCFC&WCD facilities and Caltrans rights-of-way.

2.5 As-Built Verification and Confidence-Based Field
Validation
RICK will leverage drainage boundary tracing in GIS to locate discontinuities between mapped and inferred systems,
particularly at jurisdictional interfaces with RCFC&WCD facilities and Caltrans rights-of-way.

All verified assets will be assigned a Confidence Level (High, Moderate, Low) within the GIS schema, based on source
and verification type (e.g., field-measured, record plan, inferred). These fields, Spatial Source, Spatial Confidence, and Attribute Confidence, allow City staff to visualize data reliability directly within ArcGIS (assumes review of 150 As- Built Plan Sheets).

Field verification efforts are limited to the activities defined in the Priority Matrix and are capped at up to ten (10) field- verification days unless otherwise authorized by the City.

CCTV inspection is considered an optional, City-approved task and will only be performed if directed; for budgeting purposes, we have assumed up to ten (10) days of on-
call CCTV support through RICK’s established inspection partner.

2.6 Compile GIS Data and Assemble Inventory
Database
Following priority verification, the GIS inventory will be updated to a Model-Ready condition, meaning:
• Network connectivity is complete
• Backbone conveyance geometry and elevations are
verified
• Confidence Levels are assigned and documented for
all features
Once these updates are complete, the drainage GIS will
be formally designated Model-Ready, meaning the system
reflects verified conveyance pathways, elevations, and data confidence appropriate for hydraulic evaluation.

This verified database will then integrate directly with the Task 3 PCSWMM hydrologic and hydraulic model, helping
ensure that modeling results represent the built environment rather than inferred or assumed conditions.

Deliverables:
• Consolidated drainage data library
• Data Gap Matrix identifying missing or uncertain
attributes
• Priority Matrix for Field Verification and As-Built
Digitization
• Field Verification Prioritization Map and Log
• Confidence Level Rating incorporated into GIS dataset • GIS Storm Drain Inventory Geodatabase with full
metadata documentation
Priority level Asset Focus Field Verification Approach
High City-owned trunk mains, major culverts, major
crossings, detention basins
Verify before modeling using as-built review, spot
survey, or CCTV as applicable
Moderate Local collector lines with moderate influence on hydraulic grade
Verify selectively if modeling shows sensitivity
Low Laterals or structures with minimal capacity effect Verification is resource dependent; Confidence Level documented
City of Menifee Dashboard
16 City Benefits:
• Establishes one authoritative drainage system dataset • Focuses field verification where it has maximum
hydraulic and CIP value
• Ensures trunk and high-consequence conveyance
assets are fully understood
• Reduces cost by avoiding unnecessary field work and
digitization
• Produces a model-ready and maintenance-ready GIS
system
• Creates transparency in data certainty to support future planning and budgeting
TASK 3: EXISTING CONDITION

HYDROLOGIC AND HYDRAULIC

ANALYSIS AND MODELING
This task develops the citywide hydrologic and hydraulic (H&H) model using the verified, Model-Ready drainage GIS.

Before modeling begins, RICK will meet with the City to review available hydrologic and hydraulic methodologies, confirm RCFC&WCD compliance needs, and jointly select
the approach that best aligns with the City’s goals. RICK has extensive experience delivering H&H models under
RCFC&WCD standards, ADP/MDP methodologies, and
citywide master-planning frameworks, and will ensure the agreed-upon method is compliant, reliable, and appropriate for long-term City use.

Although SWMM itself was excluded in the City’s Q&A,
PCSWMM can be configured to fully apply RCFC&WCD
hydrology, including District-standard rainfall patterns, loss parameters, routing assumptions, and unit hydrograph
methods. RICK recommends a PCSWMM-based approach
that incorporates these RCFC&WCD requirements while
enabling 2D overland flow, providing a practical and
compliant “best-of-both-worlds” solution.

This method improves upon traditional ADP/MDP
hydrology by enabling evaluation of how local infrastructure constraints, roadway grading, inlet capacity, and overland flow paths influence system performance, producing a
more complete understanding of actual conditions within Murrieta’s built environment allowing for better allocation of resources during CIP development.

3.1 Compile Hydrologic Data and Generate
Subcatchments
RICK will generate subcatchments using updated terrain
data and the verified GIS. Based on the City’s ~1,854 catch basins and 156 inlets, the model will include approximately 2,000–2,100 subcatchments, providing an appropriate
level of detail for localized and basin-level hydrology.

Hydrologic inputs will be fully aligned with RCFC&WCD
methodology, including:
• District-standard loss rates and infiltration parameters • Unit hydrograph parameters consistent with applicable ADP/MDP basins
• Runoff coefficients derived from RCFC&WCD land-use
categories
• Routing, roughness, and depression storage values
consistent with District practice
Design storms will use RCFC&WCD rainfall distributions
and IDF curves. NOAA Atlas 14 may be referenced for
cross-checks and potential incorporation.

3.2 Existing Condition Hydrologic and Hydraulic Model
RICK will construct a 1D/2D PCSWMM model that
incorporates:
• 1D pipe and channel hydraulics from the verified GIS
• 2D overland flow computation to represent roadway
ponding, surface flow routes, and drainage relief paths • Dual drainage behavior between surface and
subsurface systems
Model simulations will evaluate the 2-, 10-, and 100-year storm events, with the 100-year event used as the primary basis for deficiency mapping and CIP development.

While PCSWMM is not listed by the District, its hydrology and routing configuration will be structured to match
RCFC&WCD methodology, ensuring regional consistency
while providing enhanced representation of local flow
behavior, particularly where overland relief and roadway grading influence drainage.

Calibration will reference
available observations,
maintenance history, and
field-verified constraints.

Model results will map
surcharge locations,
roadway flooding, ponding,
and overland flow pathways
under existing conditions.

Deliverables:
• Subcatchment maps and hydrology tables
• All PCSWMM model files
• Technical memo summarizing methodology and
assumptions
• Existing condition hydraulic performance and deficiency exhibits
City Benefits:
• Subcatchment-level hydrology tied to actual inlet
distribution
• 2D modeling provides improved understanding of
roadway flooding and overland flow behavior
• Transparent, updateable model supporting future CIP
planning and grant applications
• Modeling results reflect verified infrastructure conditions from Task 2
TASK 4: RECOMMENDED IMPROVEMENTS
(CIP DEVELOPMENT)
This task converts modeling results into a defensible,
fundable set of drainage improvements. We pair hydraulic performance, system condition, and cost considerations
to develop a clear roadmap for near-term and long-term
investment. Detailed concept development and refinement City of Menifee

17 is assumed for up to ten (10) representative CIP projects, developed in coordination with City staff.

4.1 Identify Existing Deficiencies and Improvements
RICK will size deficient pipes and culverts citywide,
not only those elevated into the formal CIP list, to give Murrieta a comprehensive understanding of system needs.

Improvements may include upsizing, parallel relief systems, new inlets, channel modifications, or localized overland conveyance enhancements. This full sizing effort provides a transparent, systemwide view of drainage needs beyond the selected focus projects.

4.2 Identify Missing Proposed Improvements
RICK will identify and conceptually size new conveyance or capture facilities where system gaps, missing links, or ADP-referenced improvements limit performance.

Recommendations will reference RCFC&WCD ADP/MDP
guidance where applicable.

4.3 Identify Multi-Benefit and Water Quality
Opportunity Sites
RICK will screen the drainage network and publicly owned parcels to identify up to ten (10) locations where regional water-quality, trash-capture, or multi-benefit stormwater improvements may be feasible. These opportunity areas
will be documented in GIS and incorporated into the Web Viewer to support future grant pursuit and CIP coordination.

4.4 Prepare Opinion of Probable Construction Costs
Unit costs will be developed based on recent regional
bid history and RICK’s comparable work in surrounding
jurisdictions. All sized pipes, including structures not developed into standalone CIP projects, will be assigned planning-level costs, giving the City a clear view of
potential future obligations and opportunities for proactive reinvestment.

4.5 Prioritize Improvements Using a Scoring Matrix
RICK will apply a prioritization matrix based on hydraulic deficiency, consequence of failure, flood risk reduction, constructability, equity, and maintenance implications.

The scoring process allows clear communication to City
leadership and the public and provides a foundation for future budget cycles.

RICK will deliver:
• 5-Year near-term CIP (implementation-ready)
• 20-Year long-range program with costs

4.6 Identify Funding Sources
RICK will identify and summarize funding pathways for
each project type, including:
• FEMA BRIC and Hazard Mitigation Assistance
• CalOES grant programs
• SWRCB SRF
• IRWM funding opportunities
• RCFC&WCD or regional cost-sharing
• Federal infrastructure programs and resiliency funding Project scoring will incorporate grant competitiveness
factors, helping the City prioritize improvements that
can leverage outside funding. Where applicable, we will identify multi-benefit stormwater projects that support flood reduction, and multi benefit compliance, strengthening
grant viability.

Deliverables:
• Citywide list of deficient facilities with conceptual sizing • GIS layer of up to ten (10) multi-benefit/water-quality opportunity locations incorporated into final GIS and
Web Viewer Planning-level unit costs and project-level
estimates
• Prioritization matrix and scoring results
• 5-Year CIP and 20-Year Long-Range Program
• Funding and grant opportunity summary
City Benefits:
• Clear understanding of both immediate and long-range
drainage needs
• Transparent prioritization process grounded in hydraulic benefit and risk reduction
• Strategic positioning for competitive grant funding
• Planning-level costs that inform future budget and
impact-fee updates
TASK 5: DEVELOP THE STORM DRAIN

MASTER PLAN
This task compiles all verified data, modeling results, and improvement recommendations into a clear, actionable
Storm Drain Master Plan supported by an intuitive Web GIS Viewer.

5.1 Compile GIS and Modeling Results into Web-
Based Viewer
RICK will compile SDMP data, including drainage
inventory, modeling results, flooding extents, and CIP
recommendations, into a secure, GIS web application that can be transferred into the City’s AGOL account.

This goes beyond RFP requirements by enabling:
• Interactive viewing of improvement projects
• On-screen review of model extents and flow paths
• Department-to-department collaboration without
specialized software

18 5.2 Prepare Draft Storm Drain Master Plan
RICK will prepare the Draft SDMP consistent with the City’s specified structure and content requirements, including:
• Summary of methods, assumptions, inputs, and results
from Tasks 1–4
• Documentation of system deficiencies and improvement
needs
• Citywide mapping of drainage infrastructure, flooding extents, and basin conditions
• Tables and graphics supporting inventory, hydrology,
hydraulics, and CIP components
• High-level permitting, utility, and constructability
considerations
Enhancements beyond the RFP:
• Integrated Confidence Level maps to support future
updates
• Basin-level summaries aligned with Warm Springs, Cole Canyon, and Santa Gertrudis watershed boundaries
• Inclusion of 2D overland flow results for visualizing surface flooding pathways
RICK will provide the Draft SDMP in PDF format for City review, along with all supporting GIS data and model files.

5.3 Final SDMP
Following City review, RICK will refine the SDMP to
incorporate comments and provide:
• Finalized documentation aligned with the RFP-required content
• Updated maps, figures, and improvement
recommendations
• Final GIS geodatabase and PCSWMM model package
(1D/2D)
Enhancement:
• A clearly organized appendix structure for technical
data, submittal-ready for council adoption and future
grant applications.

5.4 O&M Best Practices Memo
RICK will prepare a concise memo outlining maintenance, inspection, and asset-management recommendations for
City-owned storm drain infrastructure. This memo fulfills the RFP requirement for operations guidance while adding:
• Condition and Confidence-based maintenance
prioritization
• Recommendations for future field verification
sequencing
• Integration with the City’s existing MS4/NPDES
programs
Deliverables:
• Draft and Final SDMP (PDF and editable formats)
• Web GIS Viewer and Instructions
• All GIS and Model Files (fully documented)
• O&M / Inspection Best Practices Memo
• Council/Commission Presentation Support
City Benefits:
• Produces a practical, usable SDMP
• Web GIS Viewer allows staff to explore and present
results without specialized software
• Plan is ready for implementation and grant pursuit
• Documented methodology ensures future updates are
low-cost
OPTIONAL TASK A: CCTV FIELD

INSPECTIONS
Based on the field research and prioritization of City-owned facilities performed in previous tasks, the RICK team will perform CCTV inspection on high-rick, or unknown-condition segments of City-Owned drainage facilities.

A.1 CCTV Inspection and PACP Condition Grading
The results of previous system research and Tasks will
inform the optional CCTV efforts. RICK will coordinate with a subconsultant to conduct targeted CCTV inspections
of high-risk or unknown-condition segments (e.g., known O&M locations, CMP), and assign PACP condition ratings
to each. Rick will prioritize evaluation of the City-owned and maintained infrastructure with a diameter of 18-inches and larger with exceptions for critical connections of smaller diameter and differing ownership to better facilitate creation of critical CIP drainage improvement recommendations.

Note: CCTV inspection scope will be defined based on
the number of days the CCTV crew will be in the field
and agreed upon with the City at project initiation. For scoping purposes, it is assumed that twenty (10) days of CCTV inspection will be completed. Additional footage or inspection rounds may require a scope amendment.

OPTIONAL TASK B: ADDITIONAL AS-

BUILT PLAN DIGITIZATION
Based on the review and digitization of available as-built plans for critical infrastructure, this optional task will provide additional as-built digitization efforts for facilities outside the scope of the original assumptions in Task 2.

B.1 Additional As-Built Data Digitization (T&M NTE)
This optional task expands the baseline scope to further enhance the storm drain model beyond what would be
strictly necessary for the Master Plan model development.

If the City elects to more fully develop existing conditions of their drainage facilities, RICK will digitize additional as- built plan information including invert elevations, depth, slope, size, for features outside what is prioritized in Task 2 assumptions, improving network accuracy and connectivity.

Work will be closely coordinated with City staff to identify priority areas, integrate new features into the GIS database, and ensure the model reflects the most complete and
accurate representation of existing infrastructure.
19 Familiarity with State and Federal Procedures
The RICK team brings extensive experience delivering
public agency projects all across Riverside County and
includes completing projects directly performed for the City. This experience yields a thorough understanding
of the processes of working with Agency Departments
including public works/engineering, parks & Recreation
and development services.

We are also experienced with the regulations, processes, and personnel of various public agencies, including the City of Tustin, City of Orange, City of Anaheim, Orange County Flood Control District, Caltrans, Orange County Transit Authority and other key municipalities. Our familiarity with public works goes beyond the lead agencies to include
significant experience with other local agencies and
stakeholders, such as the Regional Water Quality Control Board (RWQCB), and Southern California Edison, which will be invaluable when coordinating with project stakeholders.

RICK stays on the forefront of interpreting and implementing local agency regulations and standards. Our local
experience and familiarity provide significant value to clients and project stakeholders. Our project team members live in these communities and strive to prepare designs that reflect the local history, culture, and personality while maintaining client objectives, budgets, and schedules.

RICK has performed dozens of local projects within the
Riverside County Region, including for the Cities of Murrieta, Menifee, Temecula, Hemet, Wildomar, and Riverside County.

Through this experience, we have practical knowledge of regulations and standards as well as established, mutually beneficial relationships with local regulatory agencies and key project stakeholders Southern California Edison, SoCal Gas Company, and industry organizations like AWWA,
APWA, and others. Additionally, we are experienced with the regulations, processes, and personnel of various state and federal agencies, including Caltrans, California State Water Resources Control Board, FEMA, and FHWA. This agency
knowledge and experience provides significant value as
it allows us to successfully act on a moment’s notice to provide guidance and expertise, facilitate engineering
design services, and address citizen concerns to meet
critical project deadlines.

WE HAVE WORKED & COLLABORATED WITH LOCAL AGENCIES INCLUDING:

WHY THE RICK TEAM FOR THE CITY OF MURRIETA
Proven Track Record: Successfully delivered over 20 SDMPs in the last 10 years across Southern California.

Versatile Modeling Expertise: Proficient in all major modeling platforms; our 1D/2D models create clear, visual tools that help City leadership and the community understand drainage issues and solutions.

Integrated In-House Team: All GIS, modeling, QA/QC, and CIP development performed by RICK staff, no external dependencies for core tasks, ensuring efficiency, consistency, and schedule reliability.

Regulatory & Basin Familiarity: Deep understanding of MS4/NPDES programs and regional watersheds, allowing us to quickly align recommendations with local and regional requirements.

User-Ready Tools: GIS-integrated deliverables and a Web Viewer allow staff to easily apply, update, and communicate SDMP results without specialized software.

Strategic Funding Alignment: CIP recommendations packaged to support eligibility under federal, state, and regional grant programs.
20 maps, making
complex technical
data accessible to
a broad audience.

These innovations
improve decision-
making, streamline
plan development,
and support long-
term infrastructure
strategies.

WMP 2D Mesh Resolution
Sample Exhibits
RICK consistently works to advance
the efficiency and quality of the DMP/
SDMP development process by
working collaboratively with software
developers and developing unique
tools and strategies to provide
ever-improving master plans for our
clients. Here are examples of the
high-resolution modeling capabilities
and time-lapse inundation videos
that provide clear visual impacts,
facilitating stakeholder understanding.
2D Inundation Time Lapse
Web Applications
To enhance collaboration and transparency, RICK provides an interactive web application throughout the project’s duration.

This tool allows City staff to track progress, review data, provide feedback, and explore custom features tailored to project needs. Our approach includes visually impactful tools such as time-lapse inundation videos and detailed exhibit

1. Fully connected citywide GIS inventory accessible
in an easy-to-use web-application

3. One-click access to H&H results (per asset)

5. Dashboard visualizing Storm Drain Asset Conditions

4. Delineation tool to efficiently view total contributing area

6. Document Management System with Live Linked
As-Builts to GIS data

2. Clear results with visible inundation limits and
affected structures
21 Appendix

I
\ Key Personnel
Brendan Hastie PE, LEED AP
Principal-in-Charge
Brendan is a Principal at RICK where he manages a design team for preparing hydrologic, hydraulic, and water quality treatment analyses and design. Brendan has experience in a variety of water resources projects including H&H analysis, drainage design, flood plain studies, erosion and sediment control, hydromodification management, low impact development (LID), and water quality treatment facilities.

He has prepared and processed projects through various municipal agencies throughout the San Diego and Riverside region, and resource agencies including the RWQCB, the USACE, CDFW, and FEMA. He is very familiar with drainage design requirements, including variable H&H criteria, and he has prepared studies and designs ranging from the conceptual phase to final engineering, including plans, specifications, and cost estimates. He has managed similar DMPs for the County of San Diego, and Cities of Menifee, Carlsbad, San Marcos, Lemon Grove, and San Diego.

PROJECT EXPERIENCE
Menifee Drainage Master Plan, Menifee, CA: Brendan is serving as Principal- in-Charge/Project Manager for this project, working closely with the City in developing an DMP that will include a fully connected existing condition storm drain system, recommended improvements with a proposed condition model, bundled projects with opinion of probable construction cost, and identified regional improvement opportunities.

Rainbow Creek Watershed Implementation Plan, San Diego, CA: This Implementation Plan was prepared to achieve TMDL compliance within the Rainbow region of the Santa Margarita watershed of the County of San Diego.

Efforts included compiling and correcting the existing inventory, identifying priority outfalls, and creating a 1D/2D H&H model to determine potential drainage impacts on proposed structural BMPs. The work aimed to provide improved water quality benefits without negatively impacting flood conditions and culminated in six final Preliminary Engineering Reports (PERs). Brendan served as Principal-in-Charge.

Lemon Grove Drainage Master Plan, Lemon Grove, CA: Brendan served as Principal-in-Charge/Project Manager for this project, where he assessed the drainage components of the DMP by utilizing high-resolution spatial datasets to generate detailed H&H models. A holistic modeling program was used to prepare models for the 2, 10, and 100-Year (24-Hour) storm events for over five square miles of the City.

Additional Master Plan Project Experience:

Chollas Creek Watershed Master Plan, San Diego, CA
San Marcos Drainage Master Plan, San Marcos, CA

EXPERIENCE
24 Years

EDUCATION
BS, Civil Engineering,
Pennsylvania State
University

REGISTRATION
Professional Civil
Engineer in CA, No.
65809

LEED AP

PROFESSIONAL

AFFILIATIONS
American Public Works
Association (APWA)
California Storm Water
Quality Association
(CASQA)
Floodplain Management
Association (FMA)
Consultation Panel
Member for Water
Quality Improvement
Plan (WQIP) for San
Diego River
II
\ Key Personnel
Andrew Thies CFM
Project Manager
Andrew is a Principal Water Resources Manager at RICK. He has experience in every aspect of the drainage infrastructure lifecycle from planning, design, inventory development, condition assessment, and master plan modeling of the built environment. He has worked closely with H&H modeling developers to develop cutting edge approaches to H&H modeling and assessment on over 20 SDMPs throughout California. He is experienced in the use of a variety of modeling software’s and has dedicated his career to solving the challenging drainage problems of municipal clients throughout California. His experience in GIS-based master planning extends from 1D storm drain modeling of backbone systems to high resolution 1D/2D dynamically connected storm drain and surface conveyance modeling to the inlet scale and multiple variations in-between.

Andrew has also recently given SDMP presentations at FMA and CASQA annual conferences.

PROJECT EXPERIENCE
Lemon Grove Drainage Master Plan, Lemon Grove, CA: Andrew assessed the drainage components of the DMP by utilizing high- resolution spatial datasets to generate detailed H&H models. A holistic modeling program was used to prepare models for the 2, 10, and 100- Year (24-Hour) storm events for over five square miles of the City. Comprehensive storm drain condition assessment using CCTV with NASCO PACP scoring and a web-application for easy access to data for the City.

Menifee Drainage Master Plan, Menifee, CA: Andrew assisted the City of Menifee in developing an DMP that included a fully connected existing condition storm drain system, recommended improvements with a proposed condition model, bundled projects with opinion of probable construction cost, and identified regional improvement opportunities. Follow-on tasks included a comprehensive inspection plan development for all culverts with condition and maintenance recommendations presenting in an easy to use GIS based dashboard for progress tracking.

Citywide Waterway Naturalization Feasibility Study, Agoura Hills, CA Paso Robles SDMP Update, Paso Robles, CA
Carlsbad DMP Update, Carlsbad, CA
City of San Diego Individual Drainage Engineering Assessments, San Diego, CA • San Diego Bay Watershed
• San Diego River Watershed
• South Mission Beach Community
San Marcos Drainage Master Plan, San Marcos, CA
Vista Drainage Master Plan, Vista, CA
Rainbow Creek Watershed Implementation Plan, County of San Diego, CA Chico Storm Water Master Plan Update, Chico, CA

EXPERIENCE
11 Years

EDUCATION
BS, Civil Engineering,
San Diego State
University

REGISTRATION
ASFPM Certified
Floodplain Manager, No.

US-17-09950

PROFESSIONAL

AFFILIATIONS
American Public Works
Association (APWA) -
Golf Tournament Co-
Chair
California Stormwater
Quality Association
(CASQA)
Floodplain Management
Association (FMA)
III
\ Key Personnel
Venkat Gummadi PE QSD/P CPESC
QA / QC Manager & Techincal Advisor
Venkat Gummadi is an Associate Principal at RICK, with more than 16 years of professional experience focused on urban stormwater management. He specializes in stormwater best management practice (BMP) design, integrated stormwater watershed master planning, and incorporation of sustainability principals to deliver sustainable and resilient communities and infrastructure.

Venkat’s practice focuses on NPDES permitting; municipal stormwater program planning and implementation; integrated stormwater watershed master planning; stormwater BMP selection, design, and maintenance; sustainability planning, stormwater guidance manual development; drainage retrofi t designs to incorporate water quality treatment in the urban environment; and Total Maximum Daily Loads (TMDL) implementation planning.

PROJECT EXPERIENCE
San Diego Regional Guidance Documents and Efforts, San Diego County, CA: The County of San Diego, on behalf of the San Diego County Copermittees, led development of plans and guidance manuals required to comply with 2013 Regional MS4 Permit adopted by the San Diego Regional Water Quality Control Board. Venkat was the technical lead/project manager for the following:

Model BMP Design Manual;
Watershed Management Area Analysis;
Water Quality Equivalency Guidance Document – Phase 2;
Report of Waste Discharge Review and Analysis; and
San Diego BMP Help Desk Support.

Storm Water Standards, San Diego, CA: The City of San Diego developed a Storm Water Standards manual that addresses, and provides guidance for complying with, during construction requirements and updated onsite post- construction storm water requirements. This manual provides updated procedures for planning, preliminary design, selection, and design of permanent storm water BMPs based on the performance standards presented in the 2013 MS4 Permit.

Venkat was the consultant team project manager for development of the 2016 and 2018 editions of the manual.

Stream Rehabilitation Credit Framework, San Diego, CA: The Regional MS4 permit provides an option to the City of San Diego to allow implementation of stream rehabilitation projects as an alternative compliance option for priority development projects, when implementation of the rehabilitation project will have greater overall water quality benefit for the watershed management area than fully complying with the performance requirements from the MS4 permit onsite. As the consultant team project manager, Venkat oversaw development of hydromodication management equivalency metrics for stream rehabilitation projects.

EXPERIENCE
16 Years

EDUCATION
BS, Civil Engineering,
San Diego State
University
BS, Civil Engineering,
Gandhi Institute of
Technology and
Management (GITAM)

REGISTRATION
Professional Engineer in
CA, No. 81958
QSD/P, No. 268
CPESC. No. 6027
IV
\ Key Personnel
Kevin McKinnon PE QSD/P
Hydrology And Hydraulics
Kevin McKinnon, PE, MBA, is an Associate Water Resources Project Engineer at RICK. He is a registered Civil Engineer in California with over 11 years of experience in land development and public works. Progressing from designer to project manager, he has led infrastructure projects, managed design teams, and overseen budgets and contracts. His expertise includes stormwater, sewer, and water infrastructure design, along with business operations and client relations. Proficient in Civil3D, AutoCAD, ArcGIS, and hydraulic analysis tools, he combines technical skills with strategic project oversight. Kevin manages water resource projects, tracks budgets, and leads design teams.

Previously, at Shasta County DPW, he oversaw grant- funded water and wastewater projects worth up to $7 million, ensuring compliance with state and federal regulations. His past work experiences strengthened his expertise in project design, team leadership, and municipal coordination. With a blend of technical and business acumen, Kevin excels in delivering high-quality engineering solutions while effectively managing project timelines, budgets, and stakeholder relationships. His experience spans both public and private sectors, driving successful infrastructure development.

PROJECT EXPERIENCE
City of San Diego Stormwater Department, Auburn Trash Capture Devices, San Diego, CA: Kevin served as Project Engineer and managed design of regional trash capture devices for three (3) locations, tributary to Auburn Creek in San Diego to meet State of California “Trash Amendments” to the Water Quality Control Plan for Ocean Waters of California. He prepared hydraulic and hydrologic report in support of the project construction documents.

City of San Diego Stormwater Department, San Diego Bay IDEA, San Diego, CA: Kevin served as Project Engineer and worked with City statf and consultants to analyze drainage system discharging to San Diego Bay.

With team, identified system deficiencies and conceptual projects in improve system drainage and reduce flooding and inundation.

Shasta County Department of Public Works, Community Service Area (CSA) Grant Funded Projects, Shasta County, CA: Kevin served as Associate Engineer and managed four (4) grant-funded improvement projects for water and wastewater systems. Projects involved replacing aging infrastructure and upsizing systems to meet future demand. He managed subconsultants and contracts and coordinated with California funding agencies.

Additional Master Plan Project Experience:

Tustin Storm Drain Master Plan, Tustin, CA
Paso Robles Storm Drain Master Plan, Paso Robles, CA

EXPERIENCE
11 Years

EDUCATION
Master in Business
Administration,
San Diego State
University
BS, Civil and
Environmental
Engineering,
University of California,
Davis

REGISTRATION
Professional Engineer in
CA, No. 90910
QSD/QSP, No. 27334
V
\ Key Personnel
Lukas Thompson PE, QSD/P
Hydrology And Hydraulics
Lukas is an Associate Water Resources Project Engineer with RICK and has over 8 years of civil engineering design experience in both public and private sectors with another 2 years of construction management and field exposure. Lukas has prepared CDP, building permit, grading permit, right of way and public improvement civil plans and technical reports on an array of different projects ranging from private single family residential developments to high-rise private residential and mixed-use sites, to County of San Diego CIP bridge projects. Lukas has an extensive background working on private and public projects within the County of San Diego. Lukas has a high level of expertise in post construction BMP design, involving stormwater biofiltration/ infiltration basins, underground storage pipes, and modular wetland systems.

His ability to accommodate and incorporate the desires and requests of a client into his design while still adhering to technical design standards and requirements of municipalities is why clients continue to enjoy working with him project after project.

PROJECT EXPERIENCE
City of Paso Robles – Storm Drain Master Plan: Civil Engineer/Modeling Designer/Project Manager - Rick is currently preparing a Citywide SDMP for the city of Paso Robles utilizing PCSWMM. RICK has extensively been collaborating with the city in updating the GIS network of their complete storm drain inventory through data gap analysis and field reconnaissance attribute obtaining. RICK has mapped their storm drain network and incorporated the GIS based system into PCSWMM for 1D and 2D modeling analyses. The combined 1D to 2D model approach generates more realistic results which helps better identify existing storm drain network deficiencies and prepares a more accurate existing condition to then generate proposed condition modeling and propose future CIP improvements. RICK will then produce cost estimates for each of recommended CIP projects.

County of San Diego CIP, Sycamore Bridge Project, Vicinity of San Marcos: Civil Engineer – Working in conjunction with the County’s adjunct statf structural engineer, worked as the lead civil designer in preparation of the County’s 30%/70% plan package and lead the County team in design coordination meetings and discussions with adjacent stakeholders such as the City of San Marcos. Prepared the overall roadway design of the project as well as the project’s green street SWQMP.

County of San Diego CIP, 13th Street Bridge Project, Vicinity of Ramona:

Civil Engineer – Working in conjunction with the County’s adjunct statf structural engineer, worked as the lead civil designer in preparation of the County’s 70% revised plan package per Caltrans’s bridge and roadway design required modifications. Redesigned portions of roadway approaches, reconfigured the project’s intersection design, and reworked/verified the project’s overall green street 70% design SWQMP.

EXPERIENCE
10 Years

EDUCATION
BS, Civil and
Environmental
Engineering, University
of Washington

REGISTRATION
Professional Engineer in
CA, No. 91870
QSD/QSP, No. 27871
VI
\ Key Personnel
Bavya Vuppalapati EIT
Water Resources Engineering
Bavya Vuppalapati is a Principal Water Resources Designer at the San Diego office of RICK. She has experience across a wide range of water resources projects including hydrologic and hydraulic analysis, drainage and water quality design, and watershed master planning. She has extensive experience in using a combination of GIS and PCSWMM to develop drainage master plan models of varying resolution and type. Her experience in PCSWMM based master planning extends from 1-Dimensional storm drain modeling of backbone systems to high resolution 1D-2D dynamically connected storm drain and surface conveyance modeling to the inlet scale and multiple in- between.

PROJECT EXPERIENCE
Chollas Creek Watershed Master Plan, San Diego, CA: As Assistant Designer, Bavya assisted with storm drain inventory data corrections, H&H model setup, storm drain facility recommendations, and report preparation.

The project included utilizing high-resolution spatial datasets to generate detailed H&H models.

Drainage Master Plan, City of San Marcos, CA: Bavya helped prepare a Citywide DMP for the City of San Marcos utilizing PCSWMM in her role as Assistant Designer. Existing city-owned drainage facilities were identified, mapped, and incorporated into a GIS-based PCSWMM model for analysis.

Integrated Winter Gardens Drainage Plan, County of San Diego, CA: RICK prepared a comprehensive drainage plan for the County of San Diego aimed at identifying opportunities for water quality improvements while factoring in the need to improve flood control infrastructure. A 2D model was developed that identified opportunities or water quality and flood control improvements.

Bavya served as Assistant Designer.

Maple Canyon Restoration - Phase I, San Diego, CA: Bavya, as Assistant Designer, helped prepare H&H analysis as well as analysis and design of storm drain and outfall structures for all 13 systems. This project included 15 distinct drainage systems in an urban environment discharging into 13 outfalls in an open space canyon.

EXPERIENCE
9 Years

EDUCATION
MS, Water Resources
Engineering, San Diego
State University

REGISTRATION
Engineer in Training in
CA, No. 176429

PROFESSIONAL

AFFILIATIONS
San Diego County
Engineering Council
(SDCEC)
VII
\ Key Personnel
Callum McRae EIT
Water Resources Engineering
Callum McRae is a Water Resources Designer at RICK. He studied environmental engineering as an undergraduate student and civil engineering with an emphasis in water resources as a graduate student, both at SDSU.

During his time in San Diego State’s master’s program, he researched the removal of microplastics through bioretention soil media and presented his results at the annual CASQA conference in 2024. Callum’s educational background exemplifies his passion for water resources projects that benefit the environment as well as the people and communities within it. His work at Rick is focused on public programmatic projects including drainage master plans and stormwater asset mapping efforts to produce meaningful watershed level results that guide the selection of future drainage improvement projects and streamline asset management.

PROJECT EXPERIENCE
County of San Diego Spring Walley Drainage Master Plan, Spring Valley, CA: As a Water Resources Designer, Callum worked to update the existing GIS inventory in the Spring Valley watershed and used the data to develop a hydrologic and hydraulic model in PCSWMM to assess current drainage conditions and produce future recommendations documented in the Drainage Master Plan report. The County of San Diego (County) Watershed Protection Program (WPP) has partnered with San Diego Coastkeeper (Coastkeeper) and the Coastal Environmental Rights Foundation (CERF) to conduct a Multi-Benefit Stormwater Management Planning Study (Planning Study) for the Spring Valley community. The goal of the Planning Study is to provide a demonstration of a holistic stormwater management framework that identifies a suite of strategies that address multiple planning needs, including water quality improvement, community enhancement, stormwater conveyance, and climate change resiliency.

City of San Diego San Diego Bay Watershed Management Area IDEAS, San Diego Bay, CA: Callum served as a Water Resources Designer and was responsible for editing storm drain inventory data to support hydrologic and hydraulic analysis of storm drain infrastructure throughout the San Diego Bay watershed management area. This task was performed primarily in PCSWMM.

San Diego State University, Oil and Grease Concentrations in Urban Runoff, San Diego, CA: Callum conducted manual grab sampling at multiple manholes and outlets through out SDSU campus parking lots to assist with data collection for a graduate research project. The project aimed to evaluate the efficacy of different sample collection techniques for monitoring oil and grease concentrations in urban stormwater. As part of this study, stormwater infrastructure responsible for collecting runoff from parking lots was prioritized for wet weather sampling.

EXPERIENCE
8 Years

EDUCATION
MS, Civil Engineering,
San Diego State
University
BS, Environmental
Engineering, San Diego
State University

REGISTRATION
Engineer in Training in
CA, No. 177286

PROFESSIONAL

AFFILIATIONS
California Stormwater
Quality Association
(CASQA)
VIII
\ Key Personnel
Chris Mattox PE
Water Resources Engineering
Christopher (Chris) Mattox is an Associate Project Manager in RICK’s Water Resources Division. Chris serves on a design team that prepares hydrologic and hydraulic analyses, drainage system design, water quality, trash capture devices, and hydromodification management designs for public works and private developments projects. He has extensive experience using continuous simulation models (i.e., Stormwater Management Model (SWMM) and San Diego BMP Sizing Spreadsheet) to analyze projects for compliance with Final Hydromodification Management Criteria. He has prepared numerous PDP SWQMPS, WQMPs, and HMPs and is skilled in the use of HEC-1, HEC-HMS, and the Rational Method for hydrologic modeling and basin routing, as well as HEC-RAS, and CivilGeo for hydraulic and sediment transport analysis.

PROJECT EXPERIENCE
Long Valley Wash and Santa Gertrudis Creek Channel Improvements, McMillan Communities, Temecula, CA: Chris served as Water Resources Lead Designer for the hydraulic design of the improvements for portions of Santa Gertrudis Creek and Long Valley Wash Channel in the City of Temecula for the Sommers Bend (Roripaugh Ranch) Development. This included value- engineering the designs specific to channel stabilization (i.e. – alternative slope stabilization materials for Santa Gertrudis Creek and drop structure design for Long Valley Wash). This also included preparing existing and proposed condition HEC-RAS hydraulic models for both channels (approximately 1,000 linear feet for Santa Gertrudis Creek and 5,500 linear feet for Long Valley Wash), including sediment transport (long-term) scour analysis for both channel improvements. Chris was also involved with as-needed support for the jurisdictional environmental permitting for both channels. Santa Gertrudis Creek Channel is now maintained by the Riverside County Flood Control and Water Conservation District while the Long Valley Wash Channel was permitted by the City of Temecula and is privately maintained.

Ultimate Design and Construction of MDP Facility, Temecula, CA: Chris serves as the Water Resources Project Manager for the Sommers Bend project in the City of Temecula. This master planned community has over 1,000 residential units, two recreation centers, and a sports park that have all been constructed. There were several critical infrastructure improvements necessary to support the development of the site and were required prior to the issuance of building permits. An existing 72” MPD Line was designed and extended by the project to its ultimate alignment, along with construction of the associated headwall. This facility is now maintained by the RCFC District.

Additional Master Plan Project Experience:

Lennar Homes, Sevilla, French Valley, CA

EXPERIENCE
11 Years

EDUCATION
BS, Environmental
Engineering, North
Carolina University

REGISTRATION
Professional Engineer in
CA, No. 96303
Professional Engineer in
NC, No. 053039

PROFESSIONAL

AFFILIATIONS
American Society of Civil
Engineers (ASCE)
American Public Works
Association (APWA)
IX
\ Key Personnel
Christian Atadero LSIT
Surveying / Mapping
Christian is an Assistant Survey Analyst at RICK. He graduated from California Baptist University in 2022 with a Bachelor of Science in Civil Engineering. In the last five years he has worked as an intern, Chainman, Researcher, Surveyor Assistant, and Mapping Analyst, all at RICK. During his time at RICK, he has learned AutoCAD, MicroStation, and Bluebeam.

Working with a variety of people in all three departments: mapping, engineering, and survey has taught him teamwork and leadership skills.

PROJECT EXPERIENCE
On-Call Services, Moreno Valley, CA: Christian served as an assistant surveyor for monument restoration and setting of street monuments and centerline ties throughout the City of Moreno Valley.

Kaiser Permanente, Ontario, CA: Christian served as an assistant surveyor where he assisted in establishing control and running a closed traverse on the fourth story to capture column locations for real building grid lines.

Pad K Future Hotel Site, Riverside, CA: Christian served as an assistant surveyor where he assisted in the shoring monitor of piles for the excavation center.

EXPERIENCE
7 Years

EDUCATION
BS, Civil Engineering,
California Baptist
University University

REGISTRATION
Engineer in Training in
CA, No. 179101
Land Surveyor in
Training in CA, No. 9413
X
\ Key Personnel
Mikala Randich
GIS / Application Development
Mikala is a GIS Asset Manager at RICK’s San Diego office, brin ging her municipal, federal GIS, and asset management expertise to the company; she specializes in integrating spatial data and asset management software systems to efficiently analyze a range of assets, including stormwater infrastructure, roads, right-of-way, sidewalks, and additional campus infrastructure.

While creating successful end-to-end products for clients, Mikala utilizes efficient field data collection, technological data integrations, extensive support documentation, and seamless product delivery. Using ArcGIS Pro, Esri’s ArcGIS suite, and individual client unique asset management programs, Mikala supports clients with asset management planning and optimization through spatial analysis. She is collaborating with RICK’s Water Resources team to develop maintenance plan routes for efficient inspection of local pipelines, which will optimize public works vehicle routing and use inspection data to communicate maintenance recommendations via an interactive dashboard.

PROJECT EXPERIENCE
City of San Diego, As-Needed GIS Support, San Diego, CA: Mikala is currently supporting the City by managing a task order to provide as-needed GIS services. Tasks performed under this include, as-built digitization, ownership research, inventory grouping to support inspections and maintenance, and updates to existing street sweeping GIS data to make it usable for navigation.

County of San Diego, Roadmap to Update MS4 GIS Inventory San Diego, CA:

Mikala is currently supporting the County in developing a GIS database schema for MS4 stormwater infrastructure, conducting plan document research in unincorporated areas, updating the GIS inventory, and documenting a detailed roadmap process to ensure an iterative and replicable process for the client for years to come.

City of Menifee Bridge/Culvert Inventory Study, Menifee, CA: This study created a condition assessment schema for approximately 160 culverts and 2 bridges, otfering valuable insights into maintenance needs and laying the foundation for informed asset management decision making for future improvements. The GIS team completed database design, workflow development, inventory of existing assets, managing field col- lection schedule and personnel, development of GIS based evaluation methods, preparing automated reporting and maintenance costs summaries, and GIS-based deliverables. Condition assessment analysis was performed to provide a score and maintenance recommendation for the evaluated assets. An analysis dashboard was created for City staff to easily filter and find assets most in need of maintenance or CIP efforts.

EXPERIENCE
8 Years

EDUCATION
BS, Environmental
Sciences, Florida State
University

REGISTRATION
Certified Stormwater
Plan Reviewer, No. 56
7 XI
\ Key Personnel
Sydney Rankmore RPP , MCIP
Funding Strategies
Sydney is an Associate Planner with RICK’s Planning + Design Division.

Sydney is a Registered Professional Planner (RPP) and Member of the Canadian Institute of Planning (MCIP). She recently relocated to San Diego from Western Canada, bringing valuable international experience and a unique perspective on local planning issues. Sydney has five years of community planning experience and is well-versed in policy development, strategic planning, and regulatory compliance.

PROJECT EXPERIENCE
City of La Mesa, Downtown Village Specific Plan, La Mesa, CA:

Sydney is currently serving as Project Manager for the City of La Mesa Downtown Village Specific Plan Update, a focused planning initiative aimed at guiding future infill development, economic revitalization, and public realm improvements in the heart of La Mesa. This effort includes a detailed analysis of land use, mobility, economic development, and urban design strategies, supported by tailored community and stakeholder engagement. Sydney is responsible for overseeing all aspects of project delivery, including schedule tracking, coordination with City staff and subconsultants, and quality control of technical deliverables. She leads public engagement strategies—ranging from community workshops and stakeholder interviews to online tools and oversees the development of key documents including the existing conditions analysis, vision and guiding principles, land use alternatives, and design and mobility frameworks.

City of Vista, General Plan Update, Vista, CA: Sydney is currently serving as Project Manager for the City of Vista General Plan Update, a comprehensive and multi-yeareffort that will guide land use, housing, mobility, conservation, and quality of life in the City through 2050. The update includes development of General Plan elements, alternatives analysis, CEQA compliance, and a robust public engagement program. Her responsibilities include planning and facilitating public outreach events, guiding policy development in alignment with City Council priorities, managing technical teams and subconsultant partners, and ensuring clear communication across disciplines. Sydney’s leadership has been central to the project’s success in maintaining momentum, balancing technical accuracy with community input, and advancing a long-range vision that reflects Vista’s unique character and future opportunities.

City of Menifee, Innovation District Specific Plan, Menifee, CA:

Sydney is supporting the development of the City of Menifee Innovation District Specific Plan, which envisions a new, employment-focused district centered on advanced industries, research and development, and workforce housing.

The plan aims to transform a large, largely undeveloped area into a regional employment hub with a focus on flexibility, innovation, and sustainability.

Sydney contributes to the preparation of deliverables and supports the project team in shaping a comprehensive stakeholder and public engagement strategy. Her role includes participating in client and team coordination meetings, providing input on technical materials, and helping ensure that the Specific Plan reflects both community aspirations and the City’s long-term economic development goals.

EXPERIENCE
6 Years

EDUCATION
MA, Community and
Regional Planning,
University of British
Columbia BA,
Geography and
Planning, Queen’s
University

REGISTRATION
Registered Professional
Planner and Member of
the Canadian Institute of
Planning (RPP, MCIP)
International Association
of Public Participation
(IAP2)
01375.0001 962082.4 145610

EXHIBIT B
CO

NTRACT MODIFICATIONS
(Superseding Contract Boilerplate)

01375.0001 962082.4 145610

EXHIBIT C
S

CHEDULE OF COMPENSATION
I. T
he Scope of Work set forth herein shall be compensated for in the following manner:
☐ A single flat rate for all services as set forth in Exhibit “A.” ☒ Multiple flat rates for different specified services as set forth in Exhibit “A.” ☐ An hourly rate for some or all of the proposed services as set forth in Exhibit “A.” II. The total compensation for all Services shall not exceed the Contract Sum as provided in the Cover Page of this Agreement.

III. Consultant’s billing rates for any hourly Services are set forth in Exhibit “A .” In connection with the services provided pursuant to the terms of this Agreement, City will pay Consultant upon City’s receipt of a written invoice provided by Consultant no more than monthly. City will pay Consultant for work completed, billed in increments of six minutes (0.1 hours), not to exceed the Contract Sum. The City will reimburse the Consultant for reasonable out-of-pocket expenses related to performing services set forth in Exhibit “A” that are approved in advance in writing by the City such as mileage, copies, binding costs, postage, parking, travel, and lodging expenses as part of the not to exceed Contract Sum. To receive reimbursements, the Consultant must provide the City with a receipt and a description of the expense incurred along with the invoice. No mark up on expenses may be added.
01375.0001 962082.4
EX

HIBIT D
I

NSURANCE REQUIREMENTS
C
onsultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, or employees.

M

INIMUM SCOPE AND LIMIT OF INSURANCE
C
overage shall be at least as broad as:

1. Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.

2. A
utomobile Liability: Insurance Services Office Form Number CA 0001 covering, Code 1 (any auto), or if Consultant has no owned autos, Code 8 (hired) and 9 (non-owned), with limit no less than $1,000,000 per accident for bodily injury and property damage.

3. Wor
kers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease. (Not required if consultant provides written verification it has no employees)

4. P
rofessional Liability (Errors and Omissions) Insurance appropriates to the Consultant’s profession, with limit no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate.

5. C
yber: Vendor/Consultant shall procure and maintain for the duration of the contract insurance against claims for security breaches, system failures, injuries to persons, damages to software, or damages to property (including computer equipment) which may arise from or in connection with the performance of the work hereunder by the Vendor, its agents, representatives, or employees. Vendor shall procure and maintain for the duration of the contract insurance claims arising out of their services and including, but not limited to loss, damage, theft or other misuse of data, infringement of intellectual property, invasion of privacy and breach of data.

Cyber Liability Insurance, with limits not less than $2,000,000 per occurrence or claim, $2,000,000 aggregate. Coverage shall be sufficiently broad to respond to the duties and obligations as is undertaken by Vendor in this agreement and shall include, but not be 01375.0001 962082.4
l
imited to, claims involving security breach, system failure, data recovery, business interruption, cyber extortion, social engineering, infringement of intellectual property, including but not limited to infringement of copyright, trademark, trade dress, invasion of privacy violations, information theft, damage to or destruction of electronic information, release of private information, and alteration of electronic information. The policy shall provide coverage for breach response costs, regulatory fines and penalties as well as credit monitoring expenses.

6. Technology Professional Liability Errors & Omissions (On ly if vendor is providing a technology service (data storage, website designers, etc.,) or product (software providers)
Technology Professional Liability Errors and Omissions Insurance appropriate to the Consultant’s profession and work hereunder, with limits not less than $2,000,000 per occurrence. Coverage shall be sufficiently broad to respond to the duties and obligations as is undertaken by the Vendor in this agreement and shall include, but not be limited to, claims involving security breach, system failure, data recovery, business interruption, cyber extortion, social engineering, infringement of intellectual property, including but not limited to infringement of copyright, trademark, trade dress, invasion of privacy violations, information theft, damage to or destruction of electronic information, release of private information, and alteration of electronic information. The policy shall provide coverage for breach response costs, regulatory fines and penalties as well as credit monitoring expenses .
a. T
he Policy shall include, or be endorsed to include, property damage liability coverage for damage to, alteration of, loss of, or destruction of electronic data and/or information “property” of the Agency in the care, custody, or control of the Vendor.

I
f the Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

O
ther Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:

A
dditional Insured Status
The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Consultant's insurance (at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used).

P
rimary Coverage
For any claims related to this contract, the Consultant ’s insurance coverage shall be primary and non- contributory and at least as broad as ISO CG 20 01 04 13 as respects the City , its officers, officials, employees, and volunteers. Any insurance or self -insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Consultant’s insurance 01375.0001 962082.4
a
nd shall not contribute with it. This requirement shall also apply to any Excess or Umbrella liability policies.

U
mbrella or Excess Policy
The Consultant may use Umbrella or Excess Policies to provide the liability limits as required in this agreement. This form of insurance will be acceptable provided that all of the Primary and Umbrella or Excess Policies shall provide all of the insurance coverages herein required, including, but not limited to, primary and non- contributory, additional insured, Self -Insured Retentions (SIRs), indemnity, and defense requirements. The Umbrella or Excess policies shall be provided on a true “following form” or broader coverage basis, with coverage at least as broad as provided on the underlying Commercial General Liability insurance. No insurance policies maintained by the Additional Insureds, whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to contribute to a loss until the C onsultant’s primary and excess liability policies are exhausted.

N
otice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except with notice to the City.

Wai
ver of Subrogation
Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under such insurance.

Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.

S
elf-Insured Retentions
Self-insured retentions must be declared to and approved by the City . The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self -insured retention may be satisfied by either the named insured or City. The CGL and any policies, including Excess liability policies, may not be subje ct to a self -insured retention (SIR) or deductible that exceeds $25,000 [fill in the amount for your comfort level for the specific Consultant and job – it could be much higher, or in the case of a very small Consultant , you might want it lower] unless approved in writing by City. Any and all deductibles and SIRs shall be the sole responsibility of Consultant or subcontractor who procured such insurance and shall not apply to the Indemnified Additional Insured Parties. City may deduct from any amounts other wise due Consultant to fund the SIR/deductible. Policies shall NOT contain any self -insured retention (SIR) provision that limits the satisfaction of the SIR to the Named. The policy must also provide that Defense costs, including the Allocated Loss Adjustment Expenses, will satisfy the SIR or deductible. City reserves the right to obtain a copy of any policies and endorsements for verification.

A
cceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City. 01375.0001 962082.4
C
laims Made Policies (note – should be applicable only to professional liability, see below) If any of the required policies provide claims-made coverage:

1. The Retroactive Date must be shown, and must be before the date of the contract or the beginning of contract work.

2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.

3. If coverage is canceled or non -renewed, and not replaced with another claims -made policy form with a Retroactive Date prior to the contract effective date, the Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of work.

Verification of Coverage
Consultant shall furnish the City with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause and a copy of the Declarations and Endorsements Pages of the CGL and any Excess policies listing all policy endorsements. All certificates and endorsements and copies of the Declarations & Endorsements pages are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant ’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.

City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

Subcontractors
Consultant shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors.

Duration of Coverage
CGL & Excess liability policies for any construction related work, including, but not limited to, maintenance, service, or repair work, shall continue coverage for a minimum of 5 years for Completed Operations liability coverage. Such Insurance must be maintained, and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.

Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

INSURER(S) AFFORDING COVERAGE
INSURER F :

INSURER E :

INSURER D :

INSURER C :

INSURER B :

INSURER A :

NAIC #
NAME:

CONTACT
(A/C, No):

FAX
E-MAIL
ADDRESS:

PRODUCER
(A/C, No, Ext):

PHONE

INSURED
REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $
$
$PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)

COMBINED SINGLE LIMIT

AUTOS ONLY

AUTOSAUTOS ONLY

NON-OWNED

SCHEDULEDOWNED

ANY AUTO

AUTOMOBILE LIABILITY
Y / N

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under

ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-

STATUTE
PER

LIMITS(MM/DD/YYYY)

POLICY EXP
(MM/DD/YYYY)

POLICY EFF

POLICY NUMBERTYPE OF INSURANCELTR
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

EXCESS LIAB
UMBRELLA LIAB $EACH OCCURRENCE
$AGGREGATE
$
OCCUR

CLAIMS-MADE
DED RETENTION $
$PRODUCTS - COMP/OP AGG
$GENERAL AGGREGATE
$PERSONAL & ADV INJURY
$MED EXP (Any one person)
$EACH OCCURRENCE

DAMAGE TO RENTED
$PREMISES (Ea occurrence)

COMMERCIAL GENERAL LIABILITY

CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:

POLICY PRO-

JECT LOC

CERTIFICATE OF LIABILITY INSURANCE

DATE (MM/DD/YYYY)

CANCELLATION

AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED

AUTOS ONLY
4/27/2026
Cavignac
451 A Street, Suite 1800
San Diego CA 92101
Certificate Department
619-744-0574
619-234-8601
[email protected]
XL Specialty Company
37885
RICKENG-01
Valley Forge Insurance Company
20508
Rick Engineering Company
5620 Friars Road
San Diego, CA 92110
Continental Casualty Co.
20443
Continental Insurance Company
35289
Travelers Casualty and Surety Company
19038
1053138443
B
X
2,000,000
X
1,000,000
15,000
X
Separation of In
2,000,000
4,000,000
X
X
X
Y
Y
6076046485
1/1/2026
1/1/2027
4,000,000
Deductible
0 C
1,000,000
X
X
X
Y
Y
6076046499
1/1/2026
1/1/2027
D
X
X
9,000,000
6076046504
1/1/2026
1/1/2027
9,000,000
X
0 D
X
Y
WC 6 76046521
1/1/2026
1/1/2027
1,000,000
1,000,000
1,000,000
A
E
E
Professional Liability
Cyber Liability
Crime Liability
DPR5046952
105671660
105671660
8/15/2025
8/15/2025
8/15/2025
8/15/2026
8/15/2026
8/15/2026
Each Claim/Aggregate
Limit
Limit
$5M/$10M
$2,000,000
$1,000,000
Re: Project No. 21-446, Storm Drain Master Plan, Project No. 21-446 / CIP 19002. Additional Insured coverage applies to General Liability and Automobile Liability for The City of Murrieta, its officers, officials, employees, and volunteers per policy form. Waiver of subrogation applies to General Liability, Automobile Liability, and Workers Compensation per policy form. Primary coverage applies to General Liability and Automobile Liability per policy form. Excess/Umbrella policy follows form over underlying policies: General Liability, Auto Liability & Employers Liability (additional insured and waiver of subrogation apply when afforded on underlying policies). Professional Liability - Claims made form, defense costs included within limit. If the insurance company elects to cancel or non-renew coverage for any reason other than nonpayment of premium they will provide 30 days notice of such cancellation or nonrenewal. General Liability Deductible $0. Auto Physical Damage: $1,000 Comprehensive & Collision Deductibles. Workers Compensation Deductible $0. Professional Liability Deductible $250,000.

City of Murrieta
One Town Square
Murrieta CA 92562

4
/0/1/2/0/1/2/3/0/3/401/01/2026
/Caa/C34/C22/C20/C28/C3b/C21/C6d/C36/C5a/C38/Ca4/Ca5/C35/C2f/Cab/Cac/Cac/Cac 


&1$3$5$02817
6076046485
15 The Continental Insurance Co. 10/21/2024
Rick Engineering Company
%ODQNHW$GGLWLRQDO,QVXUHG2ZQHUV/HVVHHVRU&RQWUDFWRUV ZLWK3URGXFWV&RPSOHWHG2SHUDWLRQV&RYHUDJH(QGRUVHPHQW &1$
;;

3ROLF\1R

3DJHRI (QGRUVHPHQW1R

(IIHFWLYH'DWH

,QVXUHG1DPH

&RS\ULJKW&1$$OO5LJKWV5HVHUYHG
/C41/C42/C43/C44/C45/C46/C47/C48/C49
/C4a/C4b/C4c/C4d/C4e
7KLVHQGRUVHPHQWPRGLILHVLQVXUDQFHSURYLGHGXQGHUWKHIROORZLQJ

&200(5&,$/*(1(5$//,$%,/,7<&29(5$*(3$57
,WLVXQGHUVWRRGDQGDJUHHGDVIROORZV

/C49/C2e /C57/C48/C4f/C20/C49/C53/C20/C41/C4e/C20/C49/C4e/C53/C55/C52/C45/C44/C20 LVDPHQGHGWRLQFOXGHDVDQ
/C49/C6e/C73/C75/C72/C65/C64
DQ\SHUVRQRURUJDQL]DWLRQZKRP\RXDUHUHTXLUHGE\
/C77/C72/C69/C74/C74/C65/C6e/C20/C63/C6f/C6e/C74/C72/C61/C63/C74 WRDGGDVDQDGGLWLRQDOLQVXUHGRQWKLV
/C43/C6f/C76/C65/C72/C61/C67/C65/C20/C50/C61/C72/C74
EXWRQO\ZLWKUHVSHFWWROLDELOLW\IRU
/C62/C6f/C64/C69/C6c/C79
/C69/C6e/C6a/C75/C72/C79

/C70/C72/C6f/C70/C65/C72/C74/C79/C20/C64/C61/C6d/C61/C67/C65 RU
/C70/C65/C72/C73/C6f/C6e/C61/C6c/C20/C61/C6e/C64/C20/C61/C64/C76/C65/C72/C74/C69/C73/C69/C6e/C67/C20/C69/C6e/C6a/C75/C72/C79 FDXVHGLQZKROHRULQSDUWE\\RXUDFWVRURPLVVLRQVRU WKHDFWVRURPLVVLRQVRIWKRVHDFWLQJRQ\RXUEHKDOI

/C41/C2e
,QWKHSHUIRUPDQFHRI\RXURQJRLQJRSHUDWLRQVVXEMHFWWRVXFK /C77/C72/C69/C74/C74/C65/C6e/C20/C63/C6f/C6e/C74/C72/C61/C63/C74

RU
/C42/C2e
,QWKHSHUIRUPDQFHRI
/C79/C6f/C75/C72/C20/C77/C6f/C72/C6b
VXEMHFWWRVXFK
/C77/C72/C69/C74/C74/C65/C6e/C20/C63/C6f/C6e/C74/C72/C61/C63/C74 EXWRQO\ZLWKUHVSHFWWR
/C62/C6f/C64/C69/C6c/C79/C20/C69/C6e/C6a/C75/C72/C79
RU
/C70/C72/C6f/C70/C65/C72/C74/C79/C20/C64/C61/C6d/C61/C67/C65 LQFOXGHGLQWKH
/C70/C72/C6f/C64/C75/C63/C74/C73/C2d/C63/C6f/C6d/C70/C6c/C65/C74/C65/C64/C20/C6f/C70/C65/C72/C61/C74/C69/C6f/C6e/C73/C20/C68/C61/C7a/C61/C72/C64 DQGRQO\LI

/C31/C2e
7KH
/C20/C77/C72/C69/C74/C74/C65/C6e/C20/C63/C6f/C6e/C74/C72/C61/C63/C74/C20 UHTXLUHV\RXWRSURYLGHWKHDGGLWLRQDOLQVXUHGVXFKFRYHUDJH DQG
/C32/C2e
7KLV
/C43/C6f/C76/C65/C72/C61/C67/C65/C20/C50/C61/C72/C74/C20 SURYLGHVVXFKFRYHUDJH
DQG
/C43/C2e
6XEMHFWDOZD\VWRWKHWHUPVDQGFRQGLWLRQVRIWKLVSROLF\LQFOXGLQJWKHOLPLWVRILQVXUDQFHWKH,QVXUHUZLOOQRW SURYLGHVXFKDGGLWLRQDOLQVXUHGZLWK

/C31/C2e
&RYHUDJHEURDGHUWKDQZKDW\RXDUHUHTXLUHGWRSURYLGHE\WKH /C77/C72/C69/C74/C74/C65/C6e/C20/C63/C6f/C6e/C74/C72/C61/C63/C74

RU
/C32/C2e
$KLJKHUOLPLWRILQVXUDQFHWKDQZKDW\RXDUHUHTXLUHGWRSURYLGHE\WKH /C77/C72/C69/C74/C74/C65/C6e/C20/C63/C6f/C6e/C74/C72/C61/C63/C74 
$Q\FRYHUDJHJUDQWHGE\WKLV3DUDJUDSK
/C49/C2e
VKDOODSSO\VROHO\WRWKHH[WHQWSHUPLVVLEOHE\ODZ
/C49/C49/C2e
,IWKHZULWWHQFRQWUDFWUHTXLUHVDGGLWLRQDOLQVXUHGFRYHUDJHXQGHUWKHHGLWLRQRI&*RU&*WKHQ SDUDJUDSK
/C49/C2e
DERYHLVGHOHWHGLQLWVHQWLUHW\DQGUHSODFHGE\WKHIROORZLQJ

/C57/C48/C4f/C20/C49/C53/C20/C41/C4e/C20/C49/C4e/C53/C55/C52/C45/C44/C20 LVDPHQGHGWRLQFOXGHDVDQ
/C49/C6e/C73/C75/C72/C65/C64
DQ\SHUVRQRURUJDQL]DWLRQZKRP\RXDUHUHTXLUHGE\
/C77/C72/C69/C74/C74/C65/C6e/C20/C63/C6f/C6e/C74/C72/C61/C63/C74 WRDGGDVDQDGGLWLRQDOLQVXUHGRQWKLV
/C43/C6f/C76/C65/C72/C61/C67/C65/C20/C50/C61/C72/C74
EXWRQO\ZLWKUHVSHFWWROLDELOLW\IRU
/C62/C6f/C64/C69/C6c/C79
/C69/C6e/C6a/C75/C72/C79

/C70/C72/C6f/C70/C65/C72/C74/C79/C20/C64/C61/C6d/C61/C67/C65 RU
/C70/C65/C72/C73/C6f/C6e/C61/C6c/C20/C61/C6e/C64/C20/C61/C64/C76/C65/C72/C74/C69/C73/C69/C6e/C67/C20/C69/C6e/C6a/C75/C72/C79 FDXVHGLQZKROHRULQSDUWE\\RXUDFWVRURPLVVLRQVRU WKHDFWVRURPLVVLRQVRIWKRVHDFWLQJRQ\RXUEHKDOI

/C41/C2e
,QWKHSHUIRUPDQFHRI\RXURQJRLQJRSHUDWLRQVVXEMHFWWRVXFK /C77/C72/C69/C74/C74/C65/C6e/C20/C63/C6f/C6e/C74/C72/C61/C63/C74

RU
/C42/C2e
,QWKHSHUIRUPDQFHRI
/C79/C6f/C75/C72/C20/C77/C6f/C72/C6b
VXEMHFWWRVXFK
/C77/C72/C69/C74/C74/C65/C6e/C20/C63/C6f/C6e/C74/C72/C61/C63/C74 EXWRQO\ZLWKUHVSHFWWR
/C62/C6f/C64/C69/C6c/C79/C20/C69/C6e/C6a/C75/C72/C79
RU
/C70/C72/C6f/C70/C65/C72/C74/C79/C20/C64/C61/C6d/C61/C67/C65 LQFOXGHGLQWKH
/C70/C72/C6f/C64/C75/C63/C74/C73/C2d/C63/C6f/C6d/C70/C6c/C65/C74/C65/C64/C20/C6f/C70/C65/C72/C61/C74/C69/C6f/C6e/C73/C20/C68/C61/C7a/C61/C72/C64 DQGRQO\LI

/C31/C2e
7KH
/C20/C77/C72/C69/C74/C74/C65/C6e/C20/C63/C6f/C6e/C74/C72/C61/C63/C74/C20 UHTXLUHV\RXWRSURYLGHWKHDGGLWLRQDOLQVXUHGVXFKFRYHUDJH DQG
/C32/C2e
7KLV
/C43/C6f/C76/C65/C72/C61/C67/C65/C20/C50/C61/C72/C74/C20 SURYLGHVVXFKFRYHUDJH
/C49/C49/C49/C2e
%XWLIWKH
/C77/C72/C69/C74/C74/C65/C6e/C20/C63/C6f/C6e/C74/C72/C61/C63/C74/C20

UHTXLUHV

/C41/C2e
$GGLWLRQDOLQVXUHGFRYHUDJHXQGHUWKHHGLWLRQ HGLWLRQRUHGLWLRQRI&*RUXQGHUWKH HGLWLRQRI&*
RU
/C42/C2e
$GGLWLRQDOLQVXUHGFRYHUDJHZLWK³DULVLQJRXWRI´ODQJXDJH

WKHQSDUDJUDSK
/C49/C2e
DERYHLVGHOHWHGLQLWVHQWLUHW\DQGUHSODFHGE\WKHIROORZLQJ

/C57/C48/C4f/C20/C49/C53/C20/C41/C4e/C20/C49/C4e/C53/C55/C52/C45/C44 LVDPHQGHGWRLQFOXGHDVDQ
/C49/C6e/C73/C75/C72/C65/C64
DQ\SHUVRQRURUJDQL]DWLRQZKRP\RXDUHUHTXLUHGE\
/C77/C72/C69/C74/C74/C65/C6e/C20/C63/C6f/C6e/C74/C72/C61/C63/C74 WRDGGDVDQDGGLWLRQDOLQVXUHGRQWKLV
/C43/C6f/C76/C65/C72/C61/C67/C65/C20/C50/C61/C72/C74
EXWRQO\ZLWKUHVSHFWWROLDELOLW\IRU
/C62/C6f/C64/C69/C6c/C79
/C69/C6e/C6a/C75/C72/C79

/C70/C72/C6f/C70/C65/C72/C74/C79/C20/C64/C61/C6d/C61/C67/C65 RU
/C70/C65/C72/C73/C6f/C6e/C61/C6c/C20/C61/C6e/C64/C20/C61/C64/C76/C65/C72/C74/C69/C73/C69/C6e/C67/C20/C69/C6e/C6a/C75/C72/C79 DULVLQJRXWRI
/C79/C6f/C75/C72/C20/C77/C6f/C72/C6b
WKDWLVVXEMHFWWRVXFK
/C77/C72/C69/C74/C74/C65/C6e
/C63/C6f/C6e/C74/C72/C61/C63/C74

&1$3$5$02817
6076046485
15 The Continental Insurance Co. 10/21/2024
Rick Engineering Company
%ODQNHW$GGLWLRQDO,QVXUHG2ZQHUV/HVVHHVRU&RQWUDFWRUV ZLWK3URGXFWV&RPSOHWHG2SHUDWLRQV&RYHUDJH(QGRUVHPHQW &1$
;;

3ROLF\1R

3DJHRI (QGRUVHPHQW1R

(IIHFWLYH'DWH

,QVXUHG1DPH

&RS\ULJKW&1$$OO5LJKWV5HVHUYHG
/C41/C42/C43/C44/C45/C46/C47/C48/C49
/C4a/C4b/C4c/C4d/C4e
/C49/C56/C2e
%XWLIWKH
/C77/C72/C69/C74/C74/C65/C6e/C20/C63/C6f/C6e/C74/C72/C61/C63/C74/C20 UHTXLUHVDGGLWLRQDOLQVXUHGFRYHUDJHWRWKHJUHDWHVWH[WHQWSHUPLVVLEOHE\ODZWKHQ SDUDJUDSK
/C49/C2e
DERYHLVGHOHWHGLQLWVHQWLUHW\DQGUHSODFHGE\WKHIROORZLQJ

/C57/C48/C4f/C20/C49/C53/C20/C41/C4e/C20/C49/C4e/C53/C55/C52/C45/C44 LVDPHQGHGWRLQFOXGHDVDQ
/C49/C6e/C73/C75/C72/C65/C64
DQ\SHUVRQRURUJDQL]DWLRQZKRP\RXDUHUHTXLUHGE\
/C77/C72/C69/C74/C74/C65/C6e/C20/C63/C6f/C6e/C74/C72/C61/C63/C74 WRDGGDVDQDGGLWLRQDOLQVXUHGRQWKLV
/C43/C6f/C76/C65/C72/C61/C67/C65/C20/C50/C61/C72/C74
EXWRQO\ZLWKUHVSHFWWROLDELOLW\IRU
/C62/C6f/C64/C69/C6c/C79
/C69/C6e/C6a/C75/C72/C79

/C70/C72/C6f/C70/C65/C72/C74/C79/C20/C64/C61/C6d/C61/C67/C65 RU
/C70/C65/C72/C73/C6f/C6e/C61/C6c/C20/C61/C6e/C64/C20/C61/C64/C76/C65/C72/C74/C69/C73/C69/C6e/C67/C20/C69/C6e/C6a/C75/C72/C79 DULVLQJRXWRI
/C79/C6f/C75/C72/C20/C77/C6f/C72/C6b
WKDWLVVXEMHFWWRVXFK
/C77/C72/C69/C74/C74/C65/C6e
/C63/C6f/C6e/C74/C72/C61/C63/C74

/C56/C2e
7KHLQVXUDQFHJUDQWHGE\WKLVHQGRUVHPHQWWRWKHDGGLWLRQDOLQVXUHGGRHVQRWDSSO\WR /C62/C6f/C64/C69/C6c/C79/C20/C69/C6e/C6a/C75/C72/C79

/C70/C72/C6f/C70/C65/C72/C74/C79
/C64/C61/C6d/C61/C67/C65
RU
/C70/C65/C72/C73/C6f/C6e/C61/C6c/C20/C61/C6e/C64/C20/C61/C64/C76/C65/C72/C74/C69/C73/C69/C6e/C67/C20/C69/C6e/C6a/C75/C72/C79 DULVLQJRXWRI

/C41/C2e
7KHUHQGHULQJRIRUWKHIDLOXUHWRUHQGHUDQ\SURIHVVLRQDODUFKLWHFWXUDOHQJLQHHULQJRUVXUYH\LQJVHUYLFHV

LQFOXGLQJ

/C31/C2e
7KHSUHSDULQJDSSURYLQJRUIDLOLQJWRSUHSDUHRUDSSURYHPDSVVKRSGUDZLQJVRSLQLRQVUHSRUWVVXUYH\V ILHOGRUGHUVFKDQJHRUGHUVRUGUDZLQJVDQGVSHFLILFDWLRQV DQG
/C32/C2e
6XSHUYLVRU\LQVSHFWLRQDUFKLWHFWXUDORUHQJLQHHULQJDFWLYLWLHV RU
/C42/C2e
$Q\SUHPLVHVRUZRUNIRUZKLFKWKHDGGLWLRQDOLQVXUHGLVVSHFLILFDOO\OLVWHGDVDQDGGLWLRQDOLQVXUHGRQDQRWKHU HQGRUVHPHQWDWWDFKHGWRWKLV
/C43/C6f/C76/C65/C72/C61/C67/C65/C20/C50/C61/C72/C74

/C56/C49/C2e
8QGHU
/C43/C4f/C4d/C4d/C45/C52/C43/C49/C41/C4c/C20/C47/C45/C4e/C45/C52/C41/C4c/C20/C4c/C49/C41/C42/C49/C4c/C49/C54/C59/C20/C43/C4f/C4e/C44/C49/C54/C49/C4f/C4e/C53/C2c/C20 WKH
/C20
&RQGLWLRQHQWLWOHG
/C4f/C74/C68/C65/C72/C20/C49/C6e/C73/C75/C72/C61/C6e/C63/C65 LVDPHQGHGWR
DGGWKHIROORZLQJZKLFKVXSHUVHGHVDQ\SURYLVLRQWRWKHFRQWUDU\LQWKLV&RQGLWLRQRUHOVHZKHUHLQWKLV /C43/C6f/C76/C65/C72/C61/C67/C65
/C50/C61/C72/C74

/C50/C72/C69/C6d/C61/C72/C79/C20/C61/C6e/C64/C20/C4e/C6f/C6e/C63/C6f/C6e/C74/C72/C69/C62/C75/C74/C6f/C72/C79/C20/C49/C6e/C73/C75/C72/C61/C6e/C63/C65 :LWKUHVSHFWWRRWKHULQVXUDQFHDYDLODEOHWRWKHDGGLWLRQDOLQVXUHGXQGHUZKLFKWKHDGGLWLRQDOLQVXUHGLVDQDPHG LQVXUHGWKLVLQVXUDQFHLVSULPDU\WRDQGZLOOQRWVHHNFRQWULEXWLRQIURPVXFKRWKHULQVXUDQFHSURYLGHGWKDWD /C77/C72/C69/C74/C74/C65/C6e
/C63/C6f/C6e/C74/C72/C61/C63/C74
UHTXLUHVWKHLQVXUDQFHSURYLGHGE\WKLVSROLF\WREH

/C31/C2e
3ULPDU\DQGQRQFRQWULEXWLQJZLWKRWKHULQVXUDQFHDYDLODEOHWRWKHDGGLWLRQDOLQVXUHG RU
/C32/C2e
3ULPDU\DQGWRQRWVHHNFRQWULEXWLRQIURPDQ\RWKHULQVXUDQFHDYDLODEOHWRWKHDGGLWLRQDOLQVXUHG %XWH[FHSWDVVSHFLILHGDERYHWKLVLQVXUDQFHZLOOEHH[FHVVRIDOORWKHULQVXUDQFHDYDLODEOHWRWKHDGGLWLRQDOLQVXUHG /C56/C49/C49/C2e
6ROHO\ZLWKUHVSHFWWRWKHLQVXUDQFHJUDQWHGE\WKLVHQGRUVHPHQWWKHVHFWLRQHQWLWOHG /C43/C4f/C4d/C4d/C45/C52/C43/C49/C41/C4c/C20/C47/C45/C4e/C45/C52/C41/C4c /C4c/C49/C41/C42/C49/C4c/C49/C54/C59/C20/C43/C4f/C4e/C44/C49/C54/C49/C4f/C4e/C53 LVDPHQGHGDVIROORZV

7KH&RQGLWLRQHQWLWOHG
/C44/C75/C74/C69/C65/C73/C20/C49/C6e/C20/C54/C68/C65/C20/C45/C76/C65/C6e/C74/C20/C6f/C66/C20/C4f/C63/C63/C75/C72/C72/C65/C6e/C63/C65/C2c/C20/C4f/C66/C66/C65/C6e/C73/C65/C2c/C20/C43/C6c/C61/C69/C6d/C20/C6f/C72/C20/C53/C75/C69/C74 LVDPHQGHGZLWKWKHDGGLWLRQRI
WKHIROORZLQJ

$Q\DGGLWLRQDOLQVXUHGSXUVXDQWWRWKLVHQGRUVHPHQWZLOODVVRRQDVSUDFWLFDEOH

/C31/C2e
*LYHWKH,QVXUHUZULWWHQQRWLFHRIDQ\
/C63/C6c/C61/C69/C6d
RUDQ\
/C6f/C63/C63/C75/C72/C72/C65/C6e/C63/C65
RURIIHQVHZKLFKPD\UHVXOWLQD
/C63/C6c/C61/C69/C6d

/C32/C2e
6HQGWKH,QVXUHUFRSLHVRIDOOOHJDOSDSHUVUHFHLYHGDQGRWKHUZLVHFRRSHUDWHZLWKWKH,QVXUHU /C20
LQWKHLQYHVWLJDWLRQ
GHIHQVHRUVHWWOHPHQWRIWKH
/C63/C6c/C61/C69/C6d

DQG
/C33/C2e
0DNHDYDLODEOHDQ\RWKHULQVXUDQFHDQGHQGHDYRUWRWHQGHUWKHGHIHQVHDQGLQGHPQLW\RIDQ\ /C63/C6c/C61/C69/C6d
WRDQ\RWKHU
LQVXUHURUVHOILQVXUHUZKRVHSROLF\RUSURJUDPDSSOLHVWRDORVVWKDWWKH,QVXUHUFRYHUVXQGHUWKLV /C63/C6f/C76/C65/C72/C61/C67/C65/C20/C70/C61/C72/C74

+RZHYHULIWKH
/C77/C72/C69/C74/C74/C65/C6e/C20/C63/C6f/C6e/C74/C72/C61/C63/C74 UHTXLUHVWKLVLQVXUDQFHWREHSULPDU\DQGQRQFRQWULEXWRU\WKLVSDUDJUDSK /C33/C2e
GRHVQRWDSSO\WRRWKHULQVXUDQFHXQGHUZKLFKWKHDGGLWLRQDOLQVXUHGLVDQDPHGLQVXUHG 7KH,QVXUHU
/C20
KDVQRGXW\WRGHIHQGRULQGHPQLI\DQDGGLWLRQDOLQVXUHGXQGHUWKLVHQGRUVHPHQWXQWLOWKH,QVXUHUUHFHLYHV ZULWWHQQRWLFHRID
/C63/C6c/C61/C69/C6d
IURPWKHDGGLWLRQDOLQVXUHG
/Caa/C34/C22/C20/C28/C3b/C21/C6d/C36/C5a/C38/Ca4/Ca5/C36/C3c/Cab/Cac/Cac/Cac 


&1$3$5$02817
6076046485
15 The Continental Insurance Co. 10/21/2024
Rick Engineering Company
%ODQNHW$GGLWLRQDO,QVXUHG2ZQHUV/HVVHHVRU&RQWUDFWRUV ZLWK3URGXFWV&RPSOHWHG2SHUDWLRQV&RYHUDJH(QGRUVHPHQW &1$
;;

3ROLF\1R

3DJHRI (QGRUVHPHQW1R

(IIHFWLYH'DWH

,QVXUHG1DPH

&RS\ULJKW&1$$OO5LJKWV5HVHUYHG
/C41/C42/C43/C44/C45/C46/C47/C48/C49
/C4a/C4b/C4c/C4d/C4e
/C56/C49/C49/C49/C2e
6ROHO\ZLWKUHVSHFWWRWKHLQVXUDQFHJUDQWHGE\WKLVHQGRUVHPHQWWKHVHFWLRQHQWLWOHG /C44/C45/C46/C49/C4e/C49/C54/C49/C4f/C4e/C53
LVDPHQGHGWR
DGGWKHIROORZLQJGHILQLWLRQ

/C57/C72/C69/C74/C74/C65/C6e/C20/C63/C6f/C6e/C74/C72/C61/C63/C74 PHDQVDZULWWHQFRQWUDFWRUZULWWHQDJUHHPHQWWKDWUHTXLUHV\RXWRPDNHDSHUVRQRURUJDQL]DWLRQDQ DGGLWLRQDOLQVXUHG
/C20
RQWKLV
/C43/C6f/C76/C65/C72/C61/C67/C65/C20/C50/C61/C72/C74
SURYLGHGWKHFRQWUDFWRUDJUHHPHQW

/C41/C2e
:DVH[HFXWHGSULRUWR

/C31/C2e
7KH
/C62/C6f/C64/C69/C6c/C79/C20/C69/C6e/C6a/C75/C72/C79
RU
/C70/C72/C6f/C70/C65/C72/C74/C79/C20/C64/C61/C6d/C61/C67/C65

RU
/C32/C2e
7KHRIIHQVHWKDWFDXVHGWKH
/C70/C65/C72/C73/C6f/C6e/C61/C6c/C20/C61/C6e/C64/C20/C61/C64/C76/C65/C72/C74/C69/C73/C69/C6e/C67/C20/C69/C6e/C6a/C75/C72/C79

IRUZKLFKWKHDGGLWLRQDOLQVXUHGVHHNVFRYHUDJH
DQG
/C42/C2e
,VVWLOOLQHIIHFWDWWKHWLPHRIWKH
/C62/C6f/C64/C69/C6c/C79/C20/C69/C6e/C6a/C75/C72/C79/C20 RU
/C70/C72/C6f/C70/C65/C72/C74/C79/C20/C64/C61/C6d/C61/C67/C65 
/C6f/C63/C63/C75/C72/C72/C65/C6e/C63/C65
RU
/C70/C65/C72/C73/C6f/C6e/C61/C6c/C20/C61/C6e/C64/C20/C61/C64/C76/C65/C72/C74/C69/C73/C69/C6e/C67 /C69/C6e/C6a/C75/C72/C79/C20
RIIHQVH
$OORWKHUWHUPVDQGFRQGLWLRQVRIWKH3ROLF\UHPDLQXQFKDQJHG 7KLVHQGRUVHPHQWZKLFKIRUPVDSDUWRIDQGLVIRUDWWDFKPHQWWRWKH3ROLF\LVVXHGE\WKHGHVLJQDWHG,QVXUHUVWDNHVHIIHFW RQWKHHIIHFWLYHGDWHRIVDLG3ROLF\DWWKHKRXUVWDWHGLQVDLG3ROLF\XQOHVVDQRWKHUHIIHFWLYHGDWHLVVKRZQEHORZDQG H[SLUHVFRQFXUUHQWO\ZLWKVDLG3ROLF\
01/01/2024
/0/1/2/3/4/5/i255/7/1/9/1/10/11/i255/7/1/8/i255/12/12/13/14/15/16/17/18/i255/19/15/16/20/16/15/17/21/22/i255 /39/i255/12/7/18/i255/18/2/2/i255/40/3/41/42/28/26/i255/40/27/26/27/10/30/27/25/43/i255 /44/28/i255/3/26/i255/45/24/25/27/10/26/28/1/1/25/i255/32/24/25/i255/32/41/10/27/27/25/i255/28/42/32/28/8/i255 /44/29/i255/5/1/45/i255/42/32/30/27/i255/32/41/10/27/27/25/i255/45/24/25/27/10/i255/46/10/3/28/28/27/24/i255/4/1/24/28/10/32/4/28/i255/28/1/i255/47/10/1/30/3/25/27/i255/24/1/28/3/4/27/i255/1/29/i255/4/32/24/4/27/2/2/32/28/3/1/24/i255/28/1/i255/32/i255/47/32/10/28/5/i255/28/1/i255/46/42/1/11/i255/28/42/27/i255/18/41/27/24/28/i255/1/29/i255 /40/27/4/1/10/25/i255/42/32/26/i255/3/26/26/45/27/25/i255/32/i255/12/27/10/28/3/29/3/4/32/28/27/i255/1/29/i255/44/24/26/45/10/32/24/4/27/48/i255/32/24/25/i255/3/29/i255/46/27/i255/4/32/24/4/27/2/i255/32/i255/47/1/2/3/4/5/i255/28/27/10/11/i255/25/27/26/4/10/3/49/27/25/i255/1/24/i255/28/42/32/28/i255/12/27/10/28/3/29/3/4/32/28/27/i255/1/29/i255 /44/24/26/45/10/32/24/4/27/i255/29/1/10/i255/32/24/5/i255/10/27/32/26/1/24/i255/1/28/42/27/10/i255/28/42/32/24/i255/24/1/24/47/32/5/11/27/24/28/i255/1/29/i255/47/10/27/11/3/45/11/48/i255/28/42/27/24/i255/24/1/28/3/4/27/i255/1/29/i255/4/32/24/4/27/2/2/32/28/3/1/24/i255/46/3/2/2/i255/49/27/i255/47/10/1/30/3/25/27/25/i255/28/1/i255 /26/45/4/42/i255/12/27/10/28/3/29/3/4/32/28/27/42/1/2/25/27/10/26/i255/32/28/i255/2/27/32/26/28/i255/21/15/i255/25/32/5/26/i255/3/24/i255/32/25/30/32/24/4/27/i255/1/29/i255/28/42/27/i255/25/32/28/27/i255/4/32/24/4/27/2/2/32/28/3/1/24/i255/3/26/i255/27/29/29/27/4/28/3/30/27/43/i255 /44/29/i255/24/1/28/3/4/27/i255/3/26/i255/11/32/3/2/27/25/48/i255/28/42/27/24/i255/47/10/1/1/29/i255/1/29/i255/11/32/3/2/3/24/41/i255/28/1/i255/28/42/27/i255/2/32/26/28/i255/50/24/1/46/24/i255/11/32/3/2/3/24/41/i255/32/25/25/10/27/26/26/i255/1/29/i255/28/42/27/i255/12/27/10/28/3/29/3/4/32/28/27/42/1/2/25/27/10/i255/1/24/i255/29/3/2/27/i255/46/3/28/42/i255 /28/42/27/i255/18/41/27/24/28/i255/1/29/i255/40/27/4/1/10/25/i255/46/3/2/2/i255/49/27/i255/26/45/29/29/3/4/3/27/24/28/i255/28/1/i255/47/10/1/30/27/i255/24/1/28/3/4/27/43/i255 /18/24/5/i255/29/32/3/2/45/10/27/i255/49/5/i255/45/26/i255/28/1/i255/24/1/28/3/29/5/i255/26/45/4/42/i255/47/27/10/26/1/24/26/i255/1/10/i255/1/10/41/32/24/3/51/32/28/3/1/24/26/i255/46/3/2/2/i255/24/1/28/i255/27/52/28/27/24/25/i255/1/10/i255/3/24/30/32/2/3/25/32/28/27/i255/26/45/4/42/i255/4/32/24/4/27/2/2/32/28/3/1/24/48/i255/1/10/i255 /3/11/47/1/26/27/i255/32/24/5/i255/2/3/32/49/3/2/3/28/5/i255/1/10/i255/1/49/2/3/41/32/28/3/1/24/i255/45/47/1/24/i255/45/26/i255/1/10/i255/28/42/27/i255/18/41/27/24/28/i255/1/29/i255/40/27/4/1/10/25/43/i255 /18/2/2/i255/1/28/42/27/10/i255/28/27/10/11/26/i255/32/24/25/i255/4/1/24/25/3/28/3/1/24/26/i255/1/29/i255/28/42/27/i255/47/1/2/3/4/5/i255/10/27/11/32/3/24/i255/45/24/4/42/32/24/41/27/25/43/i255 /53/42/3/26/i255/27/24/25/1/10/26/27/11/27/24/28/48/i255/46/42/3/4/42/i255/29/1/10/11/26/i255/32/i255/47/32/10/28/i255/1/29/i255/32/24/25/i255/3/26/i255/29/1/10/i255/32/28/28/32/4/42/11/27/24/28/i255/28/1/i255/28/42/27/i255/47/1/2/3/4/5/i255/3/26/26/45/27/25/i255/49/5/i255/28/42/27/i255/25/27/26/3/41/24/32/28/27/25/i255/44/24/26/45/10/27/10/26/48/i255 /28/32/50/27/26/i255/27/29/29/27/4/28/i255/1/24/i255/28/42/27/i255/0/1/2/3/4/5/i255/23/29/29/27/4/28/3/30/27/i255/25/32/28/27/i255/1/29/i255/26/32/3/25/i255/47/1/2/3/4/5/i255/32/28/i255/28/42/27/i255/42/1/45/10/i255/26/28/32/28/27/25/i255/3/24/i255/26/32/3/25/i255/47/1/2/3/4/5/48/i255/45/24/2/27/26/26/i255/32/24/1/28/42/27/10/i255 /27/29/29/27/4/28/3/30/27/i255/25/32/28/27/i255/19/28/42/27/i255/23/24/25/1/10/26/27/11/27/24/28/i255/23/29/29/27/4/28/3/30/27/i255/31/32/28/27/22/i255/3/26/i255/26/42/1/46/24/i255/49/27/2/1/46/48/i255/32/24/25/i255/27/52/47/3/10/27/26/i255/4/1/24/4/45/10/10/27/24/28/2/5/i255/46/3/28/42/i255/26/32/3/25/i255/47/1/2/3/4/5/i255 /45/24/2/27/26/26/i255/32/24/1/28/42/27/10/i255/27/52/47/3/10/32/28/3/1/24/i255/25/32/28/27/i255/3/26/i255/26/42/1/46/24/i255/49/27/2/1/46/43/i255 /54/55/56/57/58/59/i255/55/61/i255/58/62/54/58/59/63/63/62/56/57/55/54/i255/56/55/i255/58/59/64/56/57/61/57/58/62/56/59/65/55/63/66/59/64/67/i255 /75/76/77/78/79/80/81/82/83/84/78/79/85/86/87/88/89/90/81/91/87/81/78/78/84/87/81/91/92/93/77/94/76/81/95 


:&
:&
Workers Compensation And Employers Liability Insurance
Policy Endorsement

BLANKET WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS
This endorsement changes the policy to which it is attached.

It is agreed that Part One - Workers’ Compensation Insurance G. Recovery From Others and Part Two - Employers’ Liability Insurance H. Recovery From Others are amended by adding the following:

We will not enforce our right to recover against persons or organizations. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) PREMIUM CHARGE - Refer to the Schedule of Operations
The charge will be an amount to which you and we agree that is a percentage of the total standard premium for California exposure. The amount is 2%.

All other terms and conditions of the policy remain unchanged.

This endorsement, which forms a part of and is for attachment to the policy issued by the designated Insurers, takes effect on the Policy Effective Date of said policy at the hour stated in said policy, unless another effective date (the Endorsement Effective Date) is shown below, and expires concurrently with said policy unless another expiration date is shown below.

Endorsement No: 2; Page: 1 of 1
Underwriting Company: American Casualty Company of Reading, Pennsylvania, 151 N Franklin St, Chicago, IL 60606
Form No: G-19160-B (11-1997)
Endorsement Effective Date:

Policy No: WC 6 76046521
Policy Effective Date: 4 Endorsement Expiration Date:
© Copyright CNA All Rights Reserved.