ATT 3 - Bid Results Summary

Murrieta City Council
June 2, 2026

Document
ATT 3 - Bid Results Summary
Meeting
June 2, 2026
Body
Murrieta City Council
Original file
120 KB
Text extracted from the city's file for reading and search. Open the original on murrieta.legistar1.com. That file is the official record.

Bid Item Description Units Quantity Unit Price Total Price % of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price
Median Total
Price
Average Total
Price
Average % of
Total Bid Price
Base Bid - Whitewood Road: Murrieta Hot Springs Road to Los Alamos Road 1 Mobilization (not to exceed 15% of total Base Bid price) LS 1 $21,455.80 $21,455.80 5.21% $18,624.00 $18,624.00 4.38% $7,000.00 $7,000.00 1.56% $25,000.00 $25,000.00 5.38% $8,387.00 $8,387.00 1.66% $12,000.00 $12,000.00 2.23% $3,000.00 $3,000.00 0.51% $34,190.42 $34,190.42 5.41% $32,000.00 $32,000.00 5.00% $15,000.00 $15,000.00 2.15% $94,392.00 $94,392.00 6.17% $18,624.00 $24,640.84 3.61% 2 Traffic Control System LS 1 $17,000.00 $17,000.00 4.13% $10,160.00 $10,160.00 2.39% $4,000.00 $4,000.00 0.89% $10,000.00 $10,000.00 2.15% $2,963.00 $2,963.00 0.59% $33,000.00 $33,000.00 6.12% $3,000.00 $3,000.00 0.51% $33,000.00 $33,000.00 5.23% $25,000.00 $25,000.00 3.91% $20,000.00 $20,000.00 2.87% $26,130.00 $26,130.00 1.71% $17,000.00 $16,750.27 2.77% 3 Pedestrian and Bicyclist Safety LS 1 $5,000.00 $5,000.00 1.21% $1,922.00 $1,922.00 0.45% $3,000.00 $3,000.00 0.67% $5,000.00 $5,000.00 1.08% $4,676.00 $4,676.00 0.92% $16,500.00 $16,500.00 3.06% $2,000.00 $2,000.00 0.34% $4,000.00 $4,000.00 0.63% $6,500.00 $6,500.00 1.02% $15,000.00 $15,000.00 2.15% $23,180.00 $23,180.00 1.51% $5,000.00 $7,888.91 1.19% 4 Water Pollution Control LS 1 $5,000.00 $5,000.00 1.21% $995.00 $995.00 0.23% $4,500.00 $4,500.00 1.00% $3,500.00 $3,500.00 0.75% $1,788.00 $1,788.00 0.35% $7,000.00 $7,000.00 1.30% $2,000.00 $2,000.00 0.34% $12,000.00 $12,000.00 1.90% $5,500.00 $5,500.00 0.86% $5,000.00 $5,000.00 0.72% $19,205.00 $19,205.00 1.25% $5,000.00 $6,044.36 0.90% 5 Project Information Sign EA 1 $1,000.00 $1,000.00 0.24% $2,328.00 $2,328.00 0.55% $2,500.00 $2,500.00 0.56% $1,500.00 $1,500.00 0.32% $770.00 $770.00 0.15% $1,325.00 $1,325.00 0.25% $1,500.00 $1,500.00 0.25% $2,000.00 $2,000.00 0.32% $1,200.00 $1,200.00 0.19% $5,000.00 $5,000.00 0.72% $3,637.00 $3,637.00 0.24% $1,500.00 $2,069.09 0.34% 6 Concrete Removal SF 7979 $5.00 $39,895.00 9.69% $3.85 $30,719.15 7.23% $8.00 $63,832.00 14.22% $3.00 $23,937.00 5.16% $5.61 $44,762.19 8.85% $5.00 $39,895.00 7.40% $5.00 $39,895.00 6.77% $4.00 $31,916.00 5.05% $7.45 $59,443.55 9.29% $3.00 $23,937.00 3.43% $21.97 $175,298.63 11.45% $39,895.00 $52,139.14 8.05% 7 Concrete Sidewalks, City Std. 320 SF 7879 $11.00 $86,669.00 21.04% $7.00 $55,153.00 12.98% $10.00 $78,790.00 17.55% $10.00 $78,790.00 16.97% $10.48 $82,571.92 16.33% $10.50 $82,729.50 15.35% $11.00 $86,669.00 14.70% $12.00 $94,548.00 14.97% $17.75 $139,852.25 21.85% $10.00 $78,790.00 11.30% $29.44 $231,957.76 15.15% $82,729.50 $99,683.68 16.20% 8 Type A-6 PCC Curb and Gutter, City Std. 301 LF 100 $100.00 $10,000.00 2.43% $51.00 $5,100.00 1.20% $75.00 $7,500.00 1.67% $20.00 $2,000.00 0.43% $80.94 $8,094.00 1.60% $58.00 $5,800.00 1.08% $140.00 $14,000.00 2.38% $60.00 $6,000.00 0.95% $98.00 $9,800.00 1.53% $150.00 $15,000.00 2.15% $128.48 $12,848.00 0.84% $8,094.00 $8,740.18 1.48% 9 Concrete Sidewalk ADA Grinding, MSD Std. 100 (4' - 6' Sidewalk Width) EA 35 $100.00 $3,500.00 0.85% $134.00 $4,690.00 1.10% $220.00 $7,700.00 1.72% $500.00 $17,500.00 3.77% $239.00 $8,365.00 1.65% $330.00 $11,550.00 2.14% $500.00 $17,500.00 2.97% $120.00 $4,200.00 0.67% $255.00 $8,925.00 1.39% $5,500.00 $192,500.00 27.60% $215.77 $7,551.95 0.49% $8,365.00 $25,816.54 4.03% 10 Remove and Dispose of Asphalt Concrete Pavement (6.5" AC Digouts) SF 1834 $3.65 $6,694.10 1.63% $9.50 $17,423.00 4.10% $8.00 $14,672.00 3.27% $2.50 $4,585.00 0.99% $7.80 $14,305.20 2.83% $5.25 $9,628.50 1.79% $12.00 $22,008.00 3.73% $6.00 $11,004.00 1.74% $7.05 $12,929.70 2.02% $5.00 $9,170.00 1.31% $24.66 $45,226.44 2.95% $12,929.70 $15,240.54 2.40% 11 Asphalt Concrete Pavement for Removal and Replacement of AC (Digouts) TON 82 $200.00 $16,400.00 3.98% $279.00 $22,878.00 5.39% $185.00 $15,170.00 3.38% $250.00 $20,500.00 4.41% $432.00 $35,424.00 7.01% $200.00 $16,400.00 3.04% $520.00 $42,640.00 7.23% $404.00 $33,128.00 5.25% $215.00 $17,630.00 2.75% $150.00 $12,300.00 1.76% $876.70 $71,889.40 4.70% $20,500.00 $27,669.04 4.45% 12 Install Pavement Striping Detail 39 (Paint) LF 200 $10.00 $2,000.00 0.49% $13.00 $2,600.00 0.61% $18.00 $3,600.00 0.80% $2.20 $440.00 0.09% $14.00 $2,800.00 0.55% $34.00 $6,800.00 1.26% $30.00 $6,000.00 1.02% $20.00 $4,000.00 0.63% $5.00 $1,000.00 0.16% $20.00 $4,000.00 0.57% $17.52 $3,504.00 0.23% $3,504.00 $3,340.36 0.58% Additive Bid 1 - Whitewood Road: Los Alamos Road to Hunter Road Subtotal $214,613.90 $172,592.15 $212,264.00 $192,752.00 $214,906.31 $242,628.00 $240,212.00 $269,986.42 $319,780.50 $395,697.00 $714,820.18 13 Mobilization (not to exceed 15% of total Additive Bid 1 Price) LS 1 $2,500.00 $2,500.00 0.61% $13,803.00 $13,803.00 3.25% $4,000.00 $4,000.00 0.89% $15,000.00 $15,000.00 3.23% $7,379.00 $7,379.00 1.46% $10,000.00 $10,000.00 1.86% $3,000.00 $3,000.00 0.51% $22,714.03 $22,714.03 3.60% $6,000.00 $6,000.00 0.94% $5,000.00 $5,000.00 0.72% $47,536.00 $47,536.00 3.11% $7,379.00 $12,448.37 1.83% 14 Traffic Control System LS 1 $4,000.00 $4,000.00 0.97% $10,160.00 $10,160.00 2.39% $4,000.00 $4,000.00 0.89% $10,000.00 $10,000.00 2.15% $2,963.00 $2,963.00 0.59% $16,500.00 $16,500.00 3.06% $3,000.00 $3,000.00 0.51% $27,000.00 $27,000.00 4.28% $11,000.00 $11,000.00 1.72% $10,000.00 $10,000.00 1.43% $12,701.00 $12,701.00 0.83% $10,000.00 $10,120.36 1.71% 15 Pedestrian and Bicyclist Safety LS 1 $1,000.00 $1,000.00 0.24% $1,922.00 $1,922.00 0.45% $2,000.00 $2,000.00 0.45% $2,500.00 $2,500.00 0.54% $4,675.00 $4,675.00 0.92% $9,750.00 $9,750.00 1.81% $2,000.00 $2,000.00 0.34% $5,000.00 $5,000.00 0.79% $2,200.00 $2,200.00 0.34% $5,000.00 $5,000.00 0.72% $11,222.00 $11,222.00 0.73% $2,500.00 $4,297.18 0.67% 16 Water Pollution Control LS 1 $1,000.00 $1,000.00 0.24% $995.00 $995.00 0.23% $1,000.00 $1,000.00 0.22% $2,500.00 $2,500.00 0.54% $1,788.00 $1,788.00 0.35% $3,500.00 $3,500.00 0.65% $2,000.00 $2,000.00 0.34% $10,000.00 $10,000.00 1.58% $2,200.00 $2,200.00 0.34% $5,000.00 $5,000.00 0.72% $9,316.00 $9,316.00 0.61% $2,200.00 $3,572.64 0.53% 17 Concrete Removal SF 1581 $5.00 $7,905.00 1.92% $3.60 $5,691.60 1.34% $8.00 $12,648.00 2.82% $5.00 $7,905.00 1.70% $5.61 $8,869.41 1.75% $5.25 $8,300.25 1.54% $6.00 $9,486.00 1.61% $4.00 $6,324.00 1.00% $7.45 $11,778.45 1.84% $5.00 $7,905.00 1.13% $24.31 $38,434.11 2.51% $8,300.25 $11,386.07 1.74% 18 Concrete Sidewalks, City Std. 320 SF 1581 $11.00 $17,391.00 4.22% $7.00 $11,067.00 2.61% $10.00 $15,810.00 3.52% $10.00 $15,810.00 3.40% $10.48 $16,568.88 3.28% $9.50 $15,019.50 2.79% $12.00 $18,972.00 3.22% $12.00 $18,972.00 3.00% $17.75 $28,062.75 4.39% $10.00 $15,810.00 2.27% $32.58 $51,508.98 3.36% $16,568.88 $20,453.83 3.28% 19 Concrete Sidewalk ADA Grinding, MSD Std. 100 (4' - 6' Sidewalk Width) EA 24 $100.00 $2,400.00 0.58% $112.00 $2,688.00 0.63% $220.00 $5,280.00 1.18% $400.00 $9,600.00 2.07% $239.00 $5,736.00 1.13% $330.00 $7,920.00 1.47% $500.00 $12,000.00 2.04% $120.00 $2,880.00 0.46% $255.00 $6,120.00 0.96% $750.00 $18,000.00 2.58% $238.78 $5,730.72 0.37% $5,736.00 $7,123.16 1.22% 20 Remove and Dispose of Asphalt Concrete Pavement (6.5" AC Digouts) SF 3410 $3.65 $12,446.50 3.02% $11.30 $38,533.00 9.07% $8.00 $27,280.00 6.08% $4.00 $13,640.00 2.94% $7.80 $26,598.00 5.26% $5.25 $17,902.50 3.32% $12.00 $40,920.00 6.94% $6.00 $20,460.00 3.24% $7.05 $24,040.50 3.76% $5.00 $17,050.00 2.44% $27.29 $93,058.90 6.08% $24,040.50 $30,175.40 4.74% 21 Asphalt Concrete Pavement for Removal and Replacement of AC (Digouts) TON 153 $200.00 $30,600.00 7.43% $251.00 $38,403.00 9.04% $185.00 $28,305.00 6.30% $250.00 $38,250.00 8.24% $432.00 $66,096.00 13.07% $200.00 $30,600.00 5.68% $520.00 $79,560.00 13.50% $404.00 $61,812.00 9.79% $215.00 $32,895.00 5.14% $200.00 $30,600.00 4.39% $647.90 $99,128.70 6.48% $38,250.00 $48,749.97 8.10% 22 Install Pavement Striping Detail 39 (Paint) LF 313 $10.00 $3,130.00 0.76% $13.00 $4,069.00 0.96% $11.00 $3,443.00 0.77% $2.20 $688.60 0.15% $14.00 $4,382.00 0.87% $17.00 $5,321.00 0.99% $30.00 $9,390.00 1.59% $13.42 $4,200.46 0.67% $5.00 $1,565.00 0.24% $25.00 $7,825.00 1.12% $17.41 $5,449.33 0.36% $4,200.46 $4,496.67 0.77% Additive Bid 2 - Whitewood Road: Hunter Road to North City Limits Subtotal $82,372.50 $127,331.60 $103,766.00 $115,893.60 $145,055.29 $124,813.25 $180,328.00 $179,362.49 $125,861.70 $122,190.00 $374,085.74 23 Mobilization (not to exceed 15% of total Additive Bid 2 Price) LS 1 $2,000.00 $2,000.00 0.49% $6,089.00 $6,089.00 1.43% $2,500.00 $2,500.00 0.56% $8,000.00 $8,000.00 1.72% $7,379.00 $7,379.00 1.46% $10,000.00 $10,000.00 1.86% $3,000.00 $3,000.00 0.51% $7,259.28 $7,259.28 1.15% $6,500.00 $6,500.00 1.02% $5,000.00 $5,000.00 0.72% $15,415.00 $15,415.00 1.01% $6,500.00 $6,649.30 1.08% 24 Traffic Control System LS 1 $1,000.00 $1,000.00 0.24% $10,160.00 $10,160.00 2.39% $2,500.00 $2,500.00 0.56% $10,000.00 $10,000.00 2.15% $2,963.00 $2,963.00 0.59% $16,000.00 $16,000.00 2.97% $3,000.00 $3,000.00 0.51% $12,000.00 $12,000.00 1.90% $6,000.00 $6,000.00 0.94% $10,000.00 $10,000.00 1.43% $4,530.00 $4,530.00 0.30% $6,000.00 $7,104.82 1.27% 25 Pedestrian and Bicyclist Safety LS 1 $1,000.00 $1,000.00 0.24% $1,922.00 $1,922.00 0.45% $2,000.00 $2,000.00 0.45% $3,500.00 $3,500.00 0.75% $4,675.00 $4,675.00 0.92% $9,750.00 $9,750.00 1.81% $3,000.00 $3,000.00 0.51% $3,000.00 $3,000.00 0.48% $2,200.00 $2,200.00 0.34% $5,000.00 $5,000.00 0.72% $4,003.00 $4,003.00 0.26% $3,000.00 $3,640.91 0.63% 26 Water Pollution Control LS 1 $1,000.00 $1,000.00 0.24% $995.00 $995.00 0.23% $1,000.00 $1,000.00 0.22% $2,500.00 $2,500.00 0.54% $1,788.00 $1,788.00 0.35% $3,500.00 $3,500.00 0.65% $2,000.00 $2,000.00 0.34% $4,000.00 $4,000.00 0.63% $2,200.00 $2,200.00 0.34% $5,000.00 $5,000.00 0.72% $3,323.00 $3,323.00 0.22% $2,200.00 $2,482.36 0.41% 27 Concrete Removal SF 1709 $5.00 $8,545.00 2.07% $3.65 $6,237.85 1.47% $8.00 $13,672.00 3.05% $4.00 $6,836.00 1.47% $5.61 $9,587.49 1.90% $5.25 $8,972.25 1.66% $6.00 $10,254.00 1.74% $4.00 $6,836.00 1.08% $7.45 $12,732.05 1.99% $5.00 $8,545.00 1.23% $24.31 $41,545.79 2.71% $8,972.25 $12,160.31 1.85% 28 Concrete Sidewalks, City Std. 320 SF 1709 $11.00 $18,799.00 4.56% $7.00 $11,963.00 2.82% $10.00 $17,090.00 3.81% $10.00 $17,090.00 3.68% $10.48 $17,910.32 3.54% $9.50 $16,235.50 3.01% $12.00 $20,508.00 3.48% $12.00 $20,508.00 3.25% $17.75 $30,334.75 4.74% $10.00 $17,090.00 2.45% $32.58 $55,679.22 3.64% $17,910.32 $22,109.80 3.54% 29 Concrete Sidewalk ADA Grinding, MSD Std. 100 (4' - 6' Sidewalk Width) EA 31 $100.00 $3,100.00 0.75% $112.00 $3,472.00 0.82% $220.00 $6,820.00 1.52% $500.00 $15,500.00 3.34% $239.00 $7,409.00 1.47% $330.00 $10,230.00 1.90% $500.00 $15,500.00 2.63% $120.00 $3,720.00 0.59% $255.00 $7,905.00 1.24% $750.00 $23,250.00 3.33% $238.78 $7,402.18 0.48% $7,409.00 $9,482.56 1.64% Additive Bid 3 - Various Citywide Locations Subtotal $35,444.00 $40,838.85 $45,582.00 $63,426.00 $51,711.81 $74,687.75 $57,262.00 $57,323.28 $67,871.80 $73,885.00 $131,898.19 30 Mobilization (not to exceed 15% of total Additive Bid 3 Price) LS 1 $2,000.00 $2,000.00 0.49% $9,946.00 $9,946.00 2.34% $3,000.00 $3,000.00 0.67% $12,000.00 $12,000.00 2.58% $7,379.00 $7,379.00 1.46% $10,000.00 $10,000.00 1.86% $3,000.00 $3,000.00 0.51% $15,800.36 $15,800.36 2.50% $10,500.00 $10,500.00 1.64% $5,000.00 $5,000.00 0.72% $36,222.00 $36,222.00 2.37% $9,946.00 $10,440.67 1.56% 31 Traffic Control System LS 1 $2,000.00 $2,000.00 0.49% $10,160.00 $10,160.00 2.39% $3,000.00 $3,000.00 0.67% $10,000.00 $10,000.00 2.15% $2,963.00 $2,963.00 0.59% $11,400.00 $11,400.00 2.11% $3,000.00 $3,000.00 0.51% $18,000.00 $18,000.00 2.85% $8,500.00 $8,500.00 1.33% $10,000.00 $10,000.00 1.43% $10,645.00 $10,645.00 0.70% $10,000.00 $8,151.64 1.38% 32 Pedestrian and Bicyclist Safety LS 1 $1,000.00 $1,000.00 0.24% $1,922.00 $1,922.00 0.45% $2,000.00 $2,000.00 0.45% $5,000.00 $5,000.00 1.08% $4,675.00 $4,675.00 0.92% $9,750.00 $9,750.00 1.81% $3,000.00 $3,000.00 0.51% $3,000.00 $3,000.00 0.48% $2,200.00 $2,200.00 0.34% $5,000.00 $5,000.00 0.72% $9,406.00 $9,406.00 0.61% $3,000.00 $4,268.45 0.69% 33 Water Pollution Control LS 1 $1,000.00 $1,000.00 0.24% $995.00 $995.00 0.23% $1,500.00 $1,500.00 0.33% $2,500.00 $2,500.00 0.54% $1,788.00 $1,788.00 0.35% $3,500.00 $3,500.00 0.65% $2,000.00 $2,000.00 0.34% $6,000.00 $6,000.00 0.95% $2,200.00 $2,200.00 0.34% $5,000.00 $5,000.00 0.72% $7,808.00 $7,808.00 0.51% $2,200.00 $3,117.36 0.47% 34 Concrete Removal SF 3179 $5.00 $15,895.00 3.86% $4.50 $14,305.50 3.37% $8.00 $25,432.00 5.66% $4.00 $12,716.00 2.74% $5.61 $17,834.19 3.53% $3.50 $11,126.50 2.06% $6.00 $19,074.00 3.24% $4.00 $12,716.00 2.01% $7.45 $23,683.55 3.70% $5.00 $15,895.00 2.28% $24.31 $77,281.49 5.05% $15,895.00 $22,359.93 3.41% 35 Concrete Sidewalks, City Std. 320 SF 2992 $11.00 $32,912.00 7.99% $7.00 $20,944.00 4.93% $10.00 $29,920.00 6.66% $10.00 $29,920.00 6.44% $10.48 $31,356.16 6.20% $9.50 $28,424.00 5.27% $12.00 $35,904.00 6.09% $12.00 $35,904.00 5.69% $17.75 $53,108.00 8.30% $10.00 $29,920.00 4.29% $32.58 $97,479.36 6.37% $31,356.16 $38,708.32 6.20% 36 Type A-6 PCC Curb and Gutter, City Std. 301 LF 187 $100.00 $18,700.00 4.54% $51.00 $9,537.00 2.25% $75.00 $14,025.00 3.12% $65.00 $12,155.00 2.62% $80.94 $15,135.78 2.99% $31.00 $5,797.00 1.08% $140.00 $26,180.00 4.44% $60.00 $11,220.00 1.78% $98.00 $18,326.00 2.86% $150.00 $28,050.00 4.02% $142.19 $26,589.53 1.74% $15,135.78 $16,883.21 2.86% 37 Remove and Dispose of Asphalt Concrete Pavement (4" AC Digouts) SF 644 $3.65 $2,350.60 0.57% $11.25 $7,245.00 1.71% $8.00 $5,152.00 1.15% $4.00 $2,576.00 0.55% $7.80 $5,023.20 0.99% $14.00 $9,016.00 1.67% $12.00 $7,728.00 1.31% $12.00 $7,728.00 1.22% $6.30 $4,057.20 0.63% $5.00 $3,220.00 0.46% $34.11 $21,966.84 1.44% $5,152.00 $6,914.80 1.06% 38 Asphalt Concrete Pavement for Removal and Replacement of AC (Digouts) TON 18 $200.00 $3,600.00 0.87% $498.00 $8,964.00 2.11% $185.00 $3,330.00 0.74% $300.00 $5,400.00 1.16% $432.00 $7,776.00 1.54% $440.00 $7,920.00 1.47% $650.00 $11,700.00 1.99% $800.00 $14,400.00 2.28% $215.00 $3,870.00 0.60% $200.00 $3,600.00 0.52% $1,251.80 $22,532.40 1.47% $7,776.00 $8,462.95 1.34% Subtotal $79,457.60 $84,018.50 $87,359.00 $92,267.00 $93,930.33 $96,933.50 $111,586.00 $124,768.36 $126,444.75 $105,685.00 $309,930.62 Total $411,888.00 $424,781.10 $448,971.00 $464,338.60 $505,603.74 $539,062.50 $589,388.00 $631,440.55 $639,958.75 $697,457.00 $1,530,734.73 Gentry General Engineering, Inc. DT Stellar General Engineering Van Engineering inc ETHICS LANDSCAPE CONSTRUCTION, INC. L C Paving & Sealing, Inc.

Bid Results Breakdown
Citywide Sidewalk Replacement Program
MSD Project No. 26-003, CIP No. 13064
Bids Opened April 30, 2026 @ 2:00 PM
Carter Enterprises Group Inc. DBA Pavement Rehab Co. Bid Review Sael Construction Corporation Leonida Builders Inc NoLimit Construction S&H Civilworks MARIN CONCRETE CONSTRUCTION, INC Bid Item Description Units Quantity Unit Price Total Price % of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price
Base Bid - Whitewood Road: Murrieta Hot Springs Road to Los Alamos Road 1 Mobilization (not to exceed 15% of total Base Bid price) LS 1 $21,455.80 $21,455.80 5.21% $18,624.00 $18,624.00 4.38% $7,000.00 2 Traffic Control System LS 1 $17,000.00 $17,000.00 4.13% $10,160.00 $10,160.00 2.39% $4,000.00 3 Pedestrian and Bicyclist Safety LS 1 $5,000.00 $5,000.00 1.21% $1,922.00 $1,922.00 0.45% $3,000.00 4 Water Pollution Control LS 1 $5,000.00 $5,000.00 1.21% $995.00 $995.00 0.23% $4,500.00 5 Project Information Sign EA 1 $1,000.00 $1,000.00 0.24% $2,328.00 $2,328.00 0.55% $2,500.00 6 Concrete Removal SF 7979 $5.00 $39,895.00 9.69% $3.85 $30,719.15 7.23% $8.00 7 Concrete Sidewalks, City Std. 320 SF 7879 $11.00 $86,669.00 21.04% $7.00 $55,153.00 12.98% $10.00 8 Type A-6 PCC Curb and Gutter, City Std. 301 LF 100 $100.00 $10,000.00 2.43% $51.00 $5,100.00 1.20% $75.00 9 Concrete Sidewalk ADA Grinding, MSD Std. 100 (4' - 6' Sidewalk Width) EA 35 $100.00 $3,500.00 0.85% $134.00 $4,690.00 1.10% $220.00 10 Remove and Dispose of Asphalt Concrete Pavement (6.5" AC Digouts) SF 1834 $3.65 $6,694.10 1.63% $9.50 $17,423.00 4.10% $8.00 11 Asphalt Concrete Pavement for Removal and Replacement of AC (Digouts) TON 82 $200.00 $16,400.00 3.98% $279.00 $22,878.00 5.39% $185.00 12 Install Pavement Striping Detail 39 (Paint) LF 200 $10.00 $2,000.00 0.49% $13.00 $2,600.00 0.61% $18.00 Additive Bid 1 - Whitewood Road: Los Alamos Road to Hunter Road Subtotal $214,613.90 $172,592.15 13 Mobilization (not to exceed 15% of total Additive Bid 1 Price) LS 1 $2,500.00 $2,500.00 0.61% $13,803.00 $13,803.00 3.25% $4,000.00 14 Traffic Control System LS 1 $4,000.00 $4,000.00 0.97% $10,160.00 $10,160.00 2.39% $4,000.00 15 Pedestrian and Bicyclist Safety LS 1 $1,000.00 $1,000.00 0.24% $1,922.00 $1,922.00 0.45% $2,000.00 16 Water Pollution Control LS 1 $1,000.00 $1,000.00 0.24% $995.00 $995.00 0.23% $1,000.00 17 Concrete Removal SF 1581 $5.00 $7,905.00 1.92% $3.60 $5,691.60 1.34% $8.00 18 Concrete Sidewalks, City Std. 320 SF 1581 $11.00 $17,391.00 4.22% $7.00 $11,067.00 2.61% $10.00 19 Concrete Sidewalk ADA Grinding, MSD Std. 100 (4' - 6' Sidewalk Width) EA 24 $100.00 $2,400.00 0.58% $112.00 $2,688.00 0.63% $220.00 20 Remove and Dispose of Asphalt Concrete Pavement (6.5" AC Digouts) SF 3410 $3.65 $12,446.50 3.02% $11.30 $38,533.00 9.07% $8.00 21 Asphalt Concrete Pavement for Removal and Replacement of AC (Digouts) TON 153 $200.00 $30,600.00 7.43% $251.00 $38,403.00 9.04% $185.00 22 Install Pavement Striping Detail 39 (Paint) LF 313 $10.00 $3,130.00 0.76% $13.00 $4,069.00 0.96% $11.00 Additive Bid 2 - Whitewood Road: Hunter Road to North City Limits Subtotal $82,372.50 $127,331.60 23 Mobilization (not to exceed 15% of total Additive Bid 2 Price) LS 1 $2,000.00 $2,000.00 0.49% $6,089.00 $6,089.00 1.43% $2,500.00 24 Traffic Control System LS 1 $1,000.00 $1,000.00 0.24% $10,160.00 $10,160.00 2.39% $2,500.00 25 Pedestrian and Bicyclist Safety LS 1 $1,000.00 $1,000.00 0.24% $1,922.00 $1,922.00 0.45% $2,000.00 26 Water Pollution Control LS 1 $1,000.00 $1,000.00 0.24% $995.00 $995.00 0.23% $1,000.00 27 Concrete Removal SF 1709 $5.00 $8,545.00 2.07% $3.65 $6,237.85 1.47% $8.00 28 Concrete Sidewalks, City Std. 320 SF 1709 $11.00 $18,799.00 4.56% $7.00 $11,963.00 2.82% $10.00 29 Concrete Sidewalk ADA Grinding, MSD Std. 100 (4' - 6' Sidewalk Width) EA 31 $100.00 $3,100.00 0.75% $112.00 $3,472.00 0.82% $220.00 Additive Bid 3 - Various Citywide Locations Subtotal $35,444.00 $40,838.85 30 Mobilization (not to exceed 15% of total Additive Bid 3 Price) LS 1 $2,000.00 $2,000.00 0.49% $9,946.00 $9,946.00 2.34% $3,000.00 31 Traffic Control System LS 1 $2,000.00 $2,000.00 0.49% $10,160.00 $10,160.00 2.39% $3,000.00 32 Pedestrian and Bicyclist Safety LS 1 $1,000.00 $1,000.00 0.24% $1,922.00 $1,922.00 0.45% $2,000.00 33 Water Pollution Control LS 1 $1,000.00 $1,000.00 0.24% $995.00 $995.00 0.23% $1,500.00 34 Concrete Removal SF 3179 $5.00 $15,895.00 3.86% $4.50 $14,305.50 3.37% $8.00 35 Concrete Sidewalks, City Std. 320 SF 2992 $11.00 $32,912.00 7.99% $7.00 $20,944.00 4.93% $10.00 36 Type A-6 PCC Curb and Gutter, City Std. 301 LF 187 $100.00 $18,700.00 4.54% $51.00 $9,537.00 2.25% $75.00 37 Remove and Dispose of Asphalt Concrete Pavement (4" AC Digouts) SF 644 $3.65 $2,350.60 0.57% $11.25 $7,245.00 1.71% $8.00 38 Asphalt Concrete Pavement for Removal and Replacement of AC (Digouts) TON 18 $200.00 $3,600.00 0.87% $498.00 $8,964.00 2.11% $185.00 Subtotal $79,457.60 $84,018.50
Total $411,888.00 $424,781.10
Gentry General Engineering, Inc. DT Stellar General Engineering Bid Results Breakdown
Citywide Sidewalk Replacement Program
MSD Project No. 26-003, CIP No. 13064
Bids Opened April 30, 2026 @ 2:00 PM
Carter Enterprises Group Inc. DBA Pavement Rehab Co.

Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price
$7,000.00 1.56% $25,000.00 $25,000.00 5.38% $8,387.00 $8,387.00 1.66% $12,000.00 $12,000.00 2.23% $3,000.00 $3,000.00 0.51% $34,190.42 $4,000.00 0.89% $10,000.00 $10,000.00 2.15% $2,963.00 $2,963.00 0.59% $33,000.00 $33,000.00 6.12% $3,000.00 $3,000.00 0.51% $33,000.00 $3,000.00 0.67% $5,000.00 $5,000.00 1.08% $4,676.00 $4,676.00 0.92% $16,500.00 $16,500.00 3.06% $2,000.00 $2,000.00 0.34% $4,000.00 $4,500.00 1.00% $3,500.00 $3,500.00 0.75% $1,788.00 $1,788.00 0.35% $7,000.00 $7,000.00 1.30% $2,000.00 $2,000.00 0.34% $12,000.00 $2,500.00 0.56% $1,500.00 $1,500.00 0.32% $770.00 $770.00 0.15% $1,325.00 $1,325.00 0.25% $1,500.00 $1,500.00 0.25% $2,000.00 $63,832.00 14.22% $3.00 $23,937.00 5.16% $5.61 $44,762.19 8.85% $5.00 $39,895.00 7.40% $5.00 $39,895.00 6.77% $4.00 $78,790.00 17.55% $10.00 $78,790.00 16.97% $10.48 $82,571.92 16.33% $10.50 $82,729.50 15.35% $11.00 $86,669.00 14.70% $12.00 $7,500.00 1.67% $20.00 $2,000.00 0.43% $80.94 $8,094.00 1.60% $58.00 $5,800.00 1.08% $140.00 $14,000.00 2.38% $60.00 $7,700.00 1.72% $500.00 $17,500.00 3.77% $239.00 $8,365.00 1.65% $330.00 $11,550.00 2.14% $500.00 $17,500.00 2.97% $120.00 $14,672.00 3.27% $2.50 $4,585.00 0.99% $7.80 $14,305.20 2.83% $5.25 $9,628.50 1.79% $12.00 $22,008.00 3.73% $6.00 $15,170.00 3.38% $250.00 $20,500.00 4.41% $432.00 $35,424.00 7.01% $200.00 $16,400.00 3.04% $520.00 $42,640.00 7.23% $404.00 $3,600.00 0.80% $2.20 $440.00 0.09% $14.00 $2,800.00 0.55% $34.00 $6,800.00 1.26% $30.00 $6,000.00 1.02% $20.00 $212,264.00 $192,752.00 $214,906.31 $242,628.00 $240,212.00 $4,000.00 0.89% $15,000.00 $15,000.00 3.23% $7,379.00 $7,379.00 1.46% $10,000.00 $10,000.00 1.86% $3,000.00 $3,000.00 0.51% $22,714.03 $4,000.00 0.89% $10,000.00 $10,000.00 2.15% $2,963.00 $2,963.00 0.59% $16,500.00 $16,500.00 3.06% $3,000.00 $3,000.00 0.51% $27,000.00 $2,000.00 0.45% $2,500.00 $2,500.00 0.54% $4,675.00 $4,675.00 0.92% $9,750.00 $9,750.00 1.81% $2,000.00 $2,000.00 0.34% $5,000.00 $1,000.00 0.22% $2,500.00 $2,500.00 0.54% $1,788.00 $1,788.00 0.35% $3,500.00 $3,500.00 0.65% $2,000.00 $2,000.00 0.34% $10,000.00 $12,648.00 2.82% $5.00 $7,905.00 1.70% $5.61 $8,869.41 1.75% $5.25 $8,300.25 1.54% $6.00 $9,486.00 1.61% $4.00 $15,810.00 3.52% $10.00 $15,810.00 3.40% $10.48 $16,568.88 3.28% $9.50 $15,019.50 2.79% $12.00 $18,972.00 3.22% $12.00 $5,280.00 1.18% $400.00 $9,600.00 2.07% $239.00 $5,736.00 1.13% $330.00 $7,920.00 1.47% $500.00 $12,000.00 2.04% $120.00 $27,280.00 6.08% $4.00 $13,640.00 2.94% $7.80 $26,598.00 5.26% $5.25 $17,902.50 3.32% $12.00 $40,920.00 6.94% $6.00 $28,305.00 6.30% $250.00 $38,250.00 8.24% $432.00 $66,096.00 13.07% $200.00 $30,600.00 5.68% $520.00 $79,560.00 13.50% $404.00 $3,443.00 0.77% $2.20 $688.60 0.15% $14.00 $4,382.00 0.87% $17.00 $5,321.00 0.99% $30.00 $9,390.00 1.59% $13.42 $103,766.00 $115,893.60 $145,055.29 $124,813.25 $180,328.00 $2,500.00 0.56% $8,000.00 $8,000.00 1.72% $7,379.00 $7,379.00 1.46% $10,000.00 $10,000.00 1.86% $3,000.00 $3,000.00 0.51% $7,259.28 $2,500.00 0.56% $10,000.00 $10,000.00 2.15% $2,963.00 $2,963.00 0.59% $16,000.00 $16,000.00 2.97% $3,000.00 $3,000.00 0.51% $12,000.00 $2,000.00 0.45% $3,500.00 $3,500.00 0.75% $4,675.00 $4,675.00 0.92% $9,750.00 $9,750.00 1.81% $3,000.00 $3,000.00 0.51% $3,000.00 $1,000.00 0.22% $2,500.00 $2,500.00 0.54% $1,788.00 $1,788.00 0.35% $3,500.00 $3,500.00 0.65% $2,000.00 $2,000.00 0.34% $4,000.00 $13,672.00 3.05% $4.00 $6,836.00 1.47% $5.61 $9,587.49 1.90% $5.25 $8,972.25 1.66% $6.00 $10,254.00 1.74% $4.00 $17,090.00 3.81% $10.00 $17,090.00 3.68% $10.48 $17,910.32 3.54% $9.50 $16,235.50 3.01% $12.00 $20,508.00 3.48% $12.00 $6,820.00 1.52% $500.00 $15,500.00 3.34% $239.00 $7,409.00 1.47% $330.00 $10,230.00 1.90% $500.00 $15,500.00 2.63% $120.00 $45,582.00 $63,426.00 $51,711.81 $74,687.75 $57,262.00
$3,000.00 0.67% $12,000.00 $12,000.00 2.58% $7,379.00 $7,379.00 1.46% $10,000.00 $10,000.00 1.86% $3,000.00 $3,000.00 0.51% $15,800.36 $3,000.00 0.67% $10,000.00 $10,000.00 2.15% $2,963.00 $2,963.00 0.59% $11,400.00 $11,400.00 2.11% $3,000.00 $3,000.00 0.51% $18,000.00 $2,000.00 0.45% $5,000.00 $5,000.00 1.08% $4,675.00 $4,675.00 0.92% $9,750.00 $9,750.00 1.81% $3,000.00 $3,000.00 0.51% $3,000.00 $1,500.00 0.33% $2,500.00 $2,500.00 0.54% $1,788.00 $1,788.00 0.35% $3,500.00 $3,500.00 0.65% $2,000.00 $2,000.00 0.34% $6,000.00 $25,432.00 5.66% $4.00 $12,716.00 2.74% $5.61 $17,834.19 3.53% $3.50 $11,126.50 2.06% $6.00 $19,074.00 3.24% $4.00 $29,920.00 6.66% $10.00 $29,920.00 6.44% $10.48 $31,356.16 6.20% $9.50 $28,424.00 5.27% $12.00 $35,904.00 6.09% $12.00 $14,025.00 3.12% $65.00 $12,155.00 2.62% $80.94 $15,135.78 2.99% $31.00 $5,797.00 1.08% $140.00 $26,180.00 4.44% $60.00 $5,152.00 1.15% $4.00 $2,576.00 0.55% $7.80 $5,023.20 0.99% $14.00 $9,016.00 1.67% $12.00 $7,728.00 1.31% $12.00 $3,330.00 0.74% $300.00 $5,400.00 1.16% $432.00 $7,776.00 1.54% $440.00 $7,920.00 1.47% $650.00 $11,700.00 1.99% $800.00 $87,359.00 $92,267.00 $93,930.33 $96,933.50 $111,586.00 $448,971.00 $464,338.60 $505,603.74 $539,062.50 $589,388.00 DT Stellar General Engineering Van Engineering inc ETHICS LANDSCAPE CONSTRUCTION, INC. L C Paving & Sealing, Inc. Sael Construction Corporation Leonida Builders Inc Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price Unit Price Total Price
% of Total
Bid Price
Median Total
Price
Average Total
Price
Average % of
Total Bid Price
$34,190.42 5.41% $32,000.00 $32,000.00 5.00% $15,000.00 $15,000.00 2.15% $94,392.00 $94,392.00 6.17% $18,624.00 $24,640.84 3.61% $33,000.00 5.23% $25,000.00 $25,000.00 3.91% $20,000.00 $20,000.00 2.87% $26,130.00 $26,130.00 1.71% $17,000.00 $16,750.27 2.77% $4,000.00 0.63% $6,500.00 $6,500.00 1.02% $15,000.00 $15,000.00 2.15% $23,180.00 $23,180.00 1.51% $5,000.00 $7,888.91 1.19% $12,000.00 1.90% $5,500.00 $5,500.00 0.86% $5,000.00 $5,000.00 0.72% $19,205.00 $19,205.00 1.25% $5,000.00 $6,044.36 0.90% $2,000.00 0.32% $1,200.00 $1,200.00 0.19% $5,000.00 $5,000.00 0.72% $3,637.00 $3,637.00 0.24% $1,500.00 $2,069.09 0.34% $31,916.00 5.05% $7.45 $59,443.55 9.29% $3.00 $23,937.00 3.43% $21.97 $175,298.63 11.45% $39,895.00 $52,139.14 8.05% $94,548.00 14.97% $17.75 $139,852.25 21.85% $10.00 $78,790.00 11.30% $29.44 $231,957.76 15.15% $82,729.50 $99,683.68 16.20% $6,000.00 0.95% $98.00 $9,800.00 1.53% $150.00 $15,000.00 2.15% $128.48 $12,848.00 0.84% $8,094.00 $8,740.18 1.48% $4,200.00 0.67% $255.00 $8,925.00 1.39% $5,500.00 $192,500.00 27.60% $215.77 $7,551.95 0.49% $8,365.00 $25,816.54 4.03% $11,004.00 1.74% $7.05 $12,929.70 2.02% $5.00 $9,170.00 1.31% $24.66 $45,226.44 2.95% $12,929.70 $15,240.54 2.40% $33,128.00 5.25% $215.00 $17,630.00 2.75% $150.00 $12,300.00 1.76% $876.70 $71,889.40 4.70% $20,500.00 $27,669.04 4.45% $4,000.00 0.63% $5.00 $1,000.00 0.16% $20.00 $4,000.00 0.57% $17.52 $3,504.00 0.23% $3,504.00 $3,340.36 0.58% $269,986.42 $319,780.50 $395,697.00 $714,820.18
$22,714.03 3.60% $6,000.00 $6,000.00 0.94% $5,000.00 $5,000.00 0.72% $47,536.00 $47,536.00 3.11% $7,379.00 $12,448.37 1.83% $27,000.00 4.28% $11,000.00 $11,000.00 1.72% $10,000.00 $10,000.00 1.43% $12,701.00 $12,701.00 0.83% $10,000.00 $10,120.36 1.71% $5,000.00 0.79% $2,200.00 $2,200.00 0.34% $5,000.00 $5,000.00 0.72% $11,222.00 $11,222.00 0.73% $2,500.00 $4,297.18 0.67% $10,000.00 1.58% $2,200.00 $2,200.00 0.34% $5,000.00 $5,000.00 0.72% $9,316.00 $9,316.00 0.61% $2,200.00 $3,572.64 0.53% $6,324.00 1.00% $7.45 $11,778.45 1.84% $5.00 $7,905.00 1.13% $24.31 $38,434.11 2.51% $8,300.25 $11,386.07 1.74% $18,972.00 3.00% $17.75 $28,062.75 4.39% $10.00 $15,810.00 2.27% $32.58 $51,508.98 3.36% $16,568.88 $20,453.83 3.28% $2,880.00 0.46% $255.00 $6,120.00 0.96% $750.00 $18,000.00 2.58% $238.78 $5,730.72 0.37% $5,736.00 $7,123.16 1.22% $20,460.00 3.24% $7.05 $24,040.50 3.76% $5.00 $17,050.00 2.44% $27.29 $93,058.90 6.08% $24,040.50 $30,175.40 4.74% $61,812.00 9.79% $215.00 $32,895.00 5.14% $200.00 $30,600.00 4.39% $647.90 $99,128.70 6.48% $38,250.00 $48,749.97 8.10% $4,200.46 0.67% $5.00 $1,565.00 0.24% $25.00 $7,825.00 1.12% $17.41 $5,449.33 0.36% $4,200.46 $4,496.67 0.77% $179,362.49 $125,861.70 $122,190.00 $374,085.74
$7,259.28 1.15% $6,500.00 $6,500.00 1.02% $5,000.00 $5,000.00 0.72% $15,415.00 $15,415.00 1.01% $6,500.00 $6,649.30 1.08% $12,000.00 1.90% $6,000.00 $6,000.00 0.94% $10,000.00 $10,000.00 1.43% $4,530.00 $4,530.00 0.30% $6,000.00 $7,104.82 1.27% $3,000.00 0.48% $2,200.00 $2,200.00 0.34% $5,000.00 $5,000.00 0.72% $4,003.00 $4,003.00 0.26% $3,000.00 $3,640.91 0.63% $4,000.00 0.63% $2,200.00 $2,200.00 0.34% $5,000.00 $5,000.00 0.72% $3,323.00 $3,323.00 0.22% $2,200.00 $2,482.36 0.41% $6,836.00 1.08% $7.45 $12,732.05 1.99% $5.00 $8,545.00 1.23% $24.31 $41,545.79 2.71% $8,972.25 $12,160.31 1.85% $20,508.00 3.25% $17.75 $30,334.75 4.74% $10.00 $17,090.00 2.45% $32.58 $55,679.22 3.64% $17,910.32 $22,109.80 3.54% $3,720.00 0.59% $255.00 $7,905.00 1.24% $750.00 $23,250.00 3.33% $238.78 $7,402.18 0.48% $7,409.00 $9,482.56 1.64% $57,323.28 $67,871.80 $73,885.00 $131,898.19
$15,800.36 2.50% $10,500.00 $10,500.00 1.64% $5,000.00 $5,000.00 0.72% $36,222.00 $36,222.00 2.37% $9,946.00 $10,440.67 1.56% $18,000.00 2.85% $8,500.00 $8,500.00 1.33% $10,000.00 $10,000.00 1.43% $10,645.00 $10,645.00 0.70% $10,000.00 $8,151.64 1.38% $3,000.00 0.48% $2,200.00 $2,200.00 0.34% $5,000.00 $5,000.00 0.72% $9,406.00 $9,406.00 0.61% $3,000.00 $4,268.45 0.69% $6,000.00 0.95% $2,200.00 $2,200.00 0.34% $5,000.00 $5,000.00 0.72% $7,808.00 $7,808.00 0.51% $2,200.00 $3,117.36 0.47% $12,716.00 2.01% $7.45 $23,683.55 3.70% $5.00 $15,895.00 2.28% $24.31 $77,281.49 5.05% $15,895.00 $22,359.93 3.41% $35,904.00 5.69% $17.75 $53,108.00 8.30% $10.00 $29,920.00 4.29% $32.58 $97,479.36 6.37% $31,356.16 $38,708.32 6.20% $11,220.00 1.78% $98.00 $18,326.00 2.86% $150.00 $28,050.00 4.02% $142.19 $26,589.53 1.74% $15,135.78 $16,883.21 2.86% $7,728.00 1.22% $6.30 $4,057.20 0.63% $5.00 $3,220.00 0.46% $34.11 $21,966.84 1.44% $5,152.00 $6,914.80 1.06% $14,400.00 2.28% $215.00 $3,870.00 0.60% $200.00 $3,600.00 0.52% $1,251.80 $22,532.40 1.47% $7,776.00 $8,462.95 1.34% $124,768.36 $126,444.75 $105,685.00 $309,930.62
$631,440.55 $639,958.75 $697,457.00 $1,530,734.73
Bid ReviewLeonida Builders Inc NoLimit Construction S&H Civilworks MARIN CONCRETE CONSTRUCTION, INC