Item No. Section Description Unit of Measure Quantity Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Median Item Price Average Item Price Average % of Total Bid Price 1 Base Bid Mobilization (not to exceed 15% of total base bid price) LS 1 $50,000.00 3.4% $180,878.73 10.8% $28,673.00 1.7% $100,000.00 5.3% $65,000.00 3.3% $96,440.00 4.8% $325,000.00 14.9% $55,000.00 2.4% $218,107.92 9.2% $250,000.00 10.1% $33,800.00 1.4% $27,850.00 1.1% $314,000.00 11.5% $96,440.00 $134,211.51 6.2% 2 Base Bid General Conditions LS 1 $50,000.00 3.4% $180,878.73 10.8% $228,231.00 13.7% $214,256.00 11.4% $98,000.00 5.0% $81,140.00 4.1% $80,000.00 3.7% $346,800.00 15.4% $26,720.31 1.1% $100,000.00 4.1% $227,700.00 9.2% $33,000.00 1.3% $150,000.00 5.5% $100,000.00 $139,748.16 6.8% 3 Base Bid Demolition LS 1 $45,000.00 3.1% $90,816.21 5.4% $59,360.00 3.6% $90,768.00 4.8% $107,182.00 5.4% $47,000.00 2.4% $115,000.00 5.3% $61,600.00 2.7% $129,744.56 5.5% $183,210.00 7.4% $250,200.00 10.1% $132,000.00 5.1% $275,000.00 10.1% $107,182.00 $122,067.75 5.5% 4 Base Bid Concrete/Minor Structural/Misc. Metals LS 1 $39,000.00 2.7% $37,005.59 2.2% $94,767.00 5.7% $174,959.00 9.3% $94,135.00 4.8% $39,370.00 2.0% $85,000.00 3.9% $187,862.40 8.3% $91,161.20 3.8% $62,075.00 2.5% $64,800.00 2.6% $181,500.00 7.0% $50,000.00 1.8% $85,000.00 $92,433.48 4.4% 5 Base Bid Rough Carpentry/Framing LS 1 $92,000.00 6.3% $68,508.07 4.1% $85,430.00 5.1% $69,138.00 3.7% $123,200.00 6.2% $89,450.00 4.5% $115,000.00 5.3% $101,624.60 4.5% $147,128.62 6.2% $239,850.00 9.7% $241,200.00 9.7% $165,000.00 6.4% $160,000.00 5.9% $115,000.00 $130,579.18 6.0% 6 Base Bid Gypsum Board/Plaster/ACT/Insulation LS 1 $63,000.00 4.3% $76,976.12 4.6% $167,586.00 10.0% $121,071.00 6.5% $130,000.00 6.6% $184,580.00 9.2% $125,000.00 5.7% $171,215.00 7.6% $242,484.61 10.2% $157,380.00 6.4% $228,300.00 9.2% $275,000.00 10.7% $145,000.00 5.3% $157,380.00 $160,584.06 7.4% 7 Base Bid Openings/Doors/Frames/Hardware LS 1 $66,000.00 4.6% $60,365.72 3.6% $63,600.00 3.8% $62,112.00 3.3% $70,000.00 3.5% $125,510.00 6.3% $65,000.00 3.0% $121,000.00 5.4% $85,036.09 3.6% $128,050.00 5.2% $121,200.00 4.9% $192,500.00 7.5% $48,000.00 1.8% $70,000.00 $92,951.83 4.3% 8 Base Bid Glazing LS 1 $12,000.00 0.8% $33,692.50 2.0% $40,439.00 2.4% $33,726.00 1.8% $62,000.00 3.1% $46,700.00 2.3% $65,000.00 3.0% $57,123.00 2.5% $40,524.58 1.7% $58,500.00 2.4% $34,800.00 1.4% $44,000.00 1.7% $40,000.00 1.5% $40,524.58 $43,731.16 2.1% 9 Base Bid Flooring LS 1 $147,000.00 10.1% $160,714.33 9.6% $106,054.00 6.3% $103,539.00 5.5% $130,708.00 6.6% $159,210.00 8.0% $65,000.00 3.0% $142,885.60 6.3% $31,299.48 1.3% $134,550.00 5.5% $68,300.00 2.7% $86,250.00 3.3% $55,000.00 2.0% $106,054.00 $106,962.34 5.4% 10 Base Bid Painting/Coatings LS 1 $31,000.00 2.1% $29,200.16 1.7% $47,345.00 2.8% $29,997.00 1.6% $62,500.00 3.2% $40,670.00 2.0% $65,000.00 3.0% $24,915.00 1.1% $131,772.77 5.5% $81,575.00 3.3% $93,400.00 3.8% $192,500.00 7.5% $94,000.00 3.4% $62,500.00 $71,067.30 3.2% 11 Base Bid Specialties/Toilet Accessories/Signage LS 1 $30,000.00 2.1% $34,905.43 2.1% $73,564.00 4.4% $108,362.00 5.8% $75,990.00 3.8% $69,360.00 3.5% $30,000.00 1.4% $52,816.50 2.3% $210,938.92 8.9% $40,430.00 1.6% $84,900.00 3.4% $33,000.00 1.3% $38,000.00 1.4% $52,816.50 $67,866.68 3.2% 12 Base Bid Finish Carpentry/Casework/Counters LS 1 $133,000.00 9.2% $112,209.49 6.7% $105,907.00 6.3% $88,009.00 4.7% $140,000.00 7.1% $193,310.00 9.7% $115,000.00 5.3% $168,447.50 7.5% $130,469.39 5.5% $116,640.00 4.7% $166,800.00 6.7% $115,000.00 4.5% $265,000.00 9.7% $130,469.39 $142,291.72 6.7% 13 Base Bid Plumbing LS 1 $170,000.00 11.7% $174,077.89 10.4% $159,000.00 9.5% $158,795.00 8.5% $175,500.00 8.9% $159,600.00 8.0% $250,000.00 11.4% $225,847.60 10.0% $178,496.43 7.5% $286,390.00 11.6% $191,000.00 7.7% $218,500.00 8.5% $180,000.00 6.6% $178,496.43 $194,400.53 9.3% 14 Base Bid HVAC/Controls/Testing, Adjusting, and Balancing LS 1 $203,000.00 14.0% $128,018.01 7.7% $131,440.00 7.9% $183,679.00 9.8% $145,250.00 7.3% $125,030.00 6.3% $135,000.00 6.2% $125,386.80 5.6% $103,024.69 4.3% $169,000.00 6.9% $148,600.00 6.0% $224,150.00 8.7% $450,000.00 16.5% $145,250.00 $174,736.81 8.2% 15 Base Bid Fire Alarm/Low Voltage/Communications LS 1 $47,000.00 3.2% $69,619.36 4.2% $12,720.00 0.8% $63,053.00 3.4% $102,984.00 5.2% $35,030.00 1.8% $85,000.00 3.9% $86,670.10 3.8% $143,384.54 6.0% $86,000.00 3.5% $115,000.00 4.6% $92,000.00 3.6% $85,000.00 3.1% $85,000.00 $78,727.77 3.6% 16 Base Bid Electrical/Lighting/Power LS 1 $169,000.00 11.7% $167,900.94 10.1% $206,700.00 12.4% $131,148.00 7.0% $280,450.00 14.2% $253,450.00 12.7% $220,000.00 10.1% $231,866.80 10.3% $325,751.76 13.7% $214,175.00 8.7% $255,000.00 10.3% $230,000.00 8.9% $200,000.00 7.3% $220,000.00 $221,957.12 10.6% 17 Base Bid Testing/Inspection Support/Commissioning LS 1 $13,000.00 0.9% $5,615.42 0.3% $1.00 0.0% $15,000.00 0.8% $15,000.00 0.8% $37,470.00 1.9% $20,000.00 0.9% $38,500.00 1.7% $39,536.18 1.7% $5,000.00 0.2% $27,200.00 1.1% $16,500.00 0.6% $15,000.00 0.5% $15,000.00 $19,063.28 0.9% 18 Base Bid Exterior/Patio Improvements LS 1 $38,000.00 2.6% $26,657.50 1.6% $23,850.00 1.4% $63,113.00 3.4% $42,000.00 2.1% $148,380.00 7.4% $165,000.00 7.6% $10,000.00 0.4% $34,264.69 1.4% $41,492.00 1.7% $64,000.00 2.6% $230,000.00 8.9% $144,000.00 5.3% $42,000.00 $79,289.01 3.6% 19 Base Bid Hazardous Material/Abatement/AQMD LS 1 $20,000.00 1.4% $15,140.28 0.9% $14,670.00 0.9% $15,514.00 0.8% $25,000.00 1.3% $25,790.00 1.3% $20,000.00 0.9% $15,224.00 0.7% $34,264.69 1.4% $78,000.00 3.2% $22,000.00 0.9% $17,250.00 0.7% $15,000.00 0.5% $20,000.00 $24,450.23 1.1% 20 Base Bid Fire Sprinklers LS 1 $32,000.00 2.2% $16,846.25 1.0% $21,200.00 1.3% $48,498.00 2.6% $32,000.00 1.6% $40,870.00 2.0% $40,000.00 1.8% $26,658.50 1.2% $31,938.64 1.3% $32,500.00 1.3% $48,800.00 2.0% $69,000.00 2.7% $10,000.00 0.4% $32,000.00 $34,639.34 1.6% Total Bid Price: $1,450,000.00 $1,670,026.73 $1,670,537.00 $1,874,737.00 $1,976,899.00 $1,998,360.00 $2,185,000.00 $2,251,443.40 $2,376,050.07 $2,464,817.00 $2,487,000.00 $2,575,000.00 $2,733,000.00 $2,185,000.00 $2,131,759.25 Tovey/Shultz Construction, Inc.
Bid Results Breakdown
Murrieta Fire & Rescue Station 1 Living Quarters Improvement Project MSD Project No. 26-001, CIP No. 21037
Bids Opened: April 28, 2026 @ 2:00 p.m.
DEARK E&C, INC Bid Review R.C. Construction Services SWCS Inc Blackstone Builders Inc. Coelho Inc R. Dependable Construction Inc. Caliba Inc. M. Brey, Inc MLC Constructors, Inc. AA Modern General Contractors Inc. First Trade Leonida Builders Inc Item No. Section Description Unit of Measure Quantity Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost 1 Base Bid Mobilization (not to exceed 15% of total base bid price) LS 1 $50,000.00 3.4% $180,878.73 10.8% $28,673.00 1.7% $100,000.00 2 Base Bid General Conditions LS 1 $50,000.00 3.4% $180,878.73 10.8% $228,231.00 13.7% $214,256.00 3 Base Bid Demolition LS 1 $45,000.00 3.1% $90,816.21 5.4% $59,360.00 3.6% $90,768.00 4 Base Bid Concrete/Minor Structural/Misc. Metals LS 1 $39,000.00 2.7% $37,005.59 2.2% $94,767.00 5.7% $174,959.00 5 Base Bid Rough Carpentry/Framing LS 1 $92,000.00 6.3% $68,508.07 4.1% $85,430.00 5.1% $69,138.00 6 Base Bid Gypsum Board/Plaster/ACT/Insulation LS 1 $63,000.00 4.3% $76,976.12 4.6% $167,586.00 10.0% $121,071.00 7 Base Bid Openings/Doors/Frames/Hardware LS 1 $66,000.00 4.6% $60,365.72 3.6% $63,600.00 3.8% $62,112.00 8 Base Bid Glazing LS 1 $12,000.00 0.8% $33,692.50 2.0% $40,439.00 2.4% $33,726.00 9 Base Bid Flooring LS 1 $147,000.00 10.1% $160,714.33 9.6% $106,054.00 6.3% $103,539.00 10 Base Bid Painting/Coatings LS 1 $31,000.00 2.1% $29,200.16 1.7% $47,345.00 2.8% $29,997.00 11 Base Bid Specialties/Toilet Accessories/Signage LS 1 $30,000.00 2.1% $34,905.43 2.1% $73,564.00 4.4% $108,362.00 12 Base Bid Finish Carpentry/Casework/Counters LS 1 $133,000.00 9.2% $112,209.49 6.7% $105,907.00 6.3% $88,009.00 13 Base Bid Plumbing LS 1 $170,000.00 11.7% $174,077.89 10.4% $159,000.00 9.5% $158,795.00 14 Base Bid HVAC/Controls/Testing, Adjusting, and Balancing LS 1 $203,000.00 14.0% $128,018.01 7.7% $131,440.00 7.9% $183,679.00 15 Base Bid Fire Alarm/Low Voltage/Communications LS 1 $47,000.00 3.2% $69,619.36 4.2% $12,720.00 0.8% $63,053.00 16 Base Bid Electrical/Lighting/Power LS 1 $169,000.00 11.7% $167,900.94 10.1% $206,700.00 12.4% $131,148.00 17 Base Bid Testing/Inspection Support/Commissioning LS 1 $13,000.00 0.9% $5,615.42 0.3% $1.00 0.0% $15,000.00 18 Base Bid Exterior/Patio Improvements LS 1 $38,000.00 2.6% $26,657.50 1.6% $23,850.00 1.4% $63,113.00 19 Base Bid Hazardous Material/Abatement/AQMD LS 1 $20,000.00 1.4% $15,140.28 0.9% $14,670.00 0.9% $15,514.00 20 Base Bid Fire Sprinklers LS 1 $32,000.00 2.2% $16,846.25 1.0% $21,200.00 1.3% $48,498.00 Total Bid Price: $1,450,000.00 $1,670,026.73 $1,670,537.00 $1,874,737.00 Tovey/Shultz Construction, Inc.
Bid Results Breakdown
Murrieta Fire & Rescue Station 1 Living Quarters Improvement Project MSD Project No. 26-001, CIP No. 21037
Bids Opened: April 28, 2026 @ 2:00 p.m.
DEARK E&C, INC R.C. Construction Services SWCS Inc
(Zoomed In Version)
% of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price
5.3% $65,000.00 3.3% $96,440.00 4.8% $325,000.00 14.9% $55,000.00 2.4% $218,107.92 9.2% $250,000.00 10.1%
11.4% $98,000.00 5.0% $81,140.00 4.1% $80,000.00 3.7% $346,800.00 15.4% $26,720.31 1.1% $100,000.00 4.1%
4.8% $107,182.00 5.4% $47,000.00 2.4% $115,000.00 5.3% $61,600.00 2.7% $129,744.56 5.5% $183,210.00 7.4%
9.3% $94,135.00 4.8% $39,370.00 2.0% $85,000.00 3.9% $187,862.40 8.3% $91,161.20 3.8% $62,075.00 2.5%
3.7% $123,200.00 6.2% $89,450.00 4.5% $115,000.00 5.3% $101,624.60 4.5% $147,128.62 6.2% $239,850.00 9.7%
6.5% $130,000.00 6.6% $184,580.00 9.2% $125,000.00 5.7% $171,215.00 7.6% $242,484.61 10.2% $157,380.00 6.4%
3.3% $70,000.00 3.5% $125,510.00 6.3% $65,000.00 3.0% $121,000.00 5.4% $85,036.09 3.6% $128,050.00 5.2%
1.8% $62,000.00 3.1% $46,700.00 2.3% $65,000.00 3.0% $57,123.00 2.5% $40,524.58 1.7% $58,500.00 2.4%
5.5% $130,708.00 6.6% $159,210.00 8.0% $65,000.00 3.0% $142,885.60 6.3% $31,299.48 1.3% $134,550.00 5.5%
1.6% $62,500.00 3.2% $40,670.00 2.0% $65,000.00 3.0% $24,915.00 1.1% $131,772.77 5.5% $81,575.00 3.3%
5.8% $75,990.00 3.8% $69,360.00 3.5% $30,000.00 1.4% $52,816.50 2.3% $210,938.92 8.9% $40,430.00 1.6%
4.7% $140,000.00 7.1% $193,310.00 9.7% $115,000.00 5.3% $168,447.50 7.5% $130,469.39 5.5% $116,640.00 4.7%
8.5% $175,500.00 8.9% $159,600.00 8.0% $250,000.00 11.4% $225,847.60 10.0% $178,496.43 7.5% $286,390.00 11.6%
9.8% $145,250.00 7.3% $125,030.00 6.3% $135,000.00 6.2% $125,386.80 5.6% $103,024.69 4.3% $169,000.00 6.9%
3.4% $102,984.00 5.2% $35,030.00 1.8% $85,000.00 3.9% $86,670.10 3.8% $143,384.54 6.0% $86,000.00 3.5%
7.0% $280,450.00 14.2% $253,450.00 12.7% $220,000.00 10.1% $231,866.80 10.3% $325,751.76 13.7% $214,175.00 8.7%
0.8% $15,000.00 0.8% $37,470.00 1.9% $20,000.00 0.9% $38,500.00 1.7% $39,536.18 1.7% $5,000.00 0.2%
3.4% $42,000.00 2.1% $148,380.00 7.4% $165,000.00 7.6% $10,000.00 0.4% $34,264.69 1.4% $41,492.00 1.7%
0.8% $25,000.00 1.3% $25,790.00 1.3% $20,000.00 0.9% $15,224.00 0.7% $34,264.69 1.4% $78,000.00 3.2%
2.6% $32,000.00 1.6% $40,870.00 2.0% $40,000.00 1.8% $26,658.50 1.2% $31,938.64 1.3% $32,500.00 1.3% $1,976,899.00 $1,998,360.00 $2,185,000.00 $2,251,443.40 $2,376,050.07 $2,464,817.00 SWCS Inc Blackstone Builders Inc. Coelho Inc R. Dependable Construction Inc. Caliba Inc. M. Brey, Inc MLC Constructors, Inc.
Item Cost % of Total Bid Price Item Cost % of Total Bid Price Item Cost % of Total Bid Price Median Item Price Average Item Price Average % of Total Bid Price $33,800.00 1.4% $27,850.00 1.1% $314,000.00 11.5% $96,440.00 $134,211.51 6.2% $227,700.00 9.2% $33,000.00 1.3% $150,000.00 5.5% $100,000.00 $139,748.16 6.8% $250,200.00 10.1% $132,000.00 5.1% $275,000.00 10.1% $107,182.00 $122,067.75 5.5% $64,800.00 2.6% $181,500.00 7.0% $50,000.00 1.8% $85,000.00 $92,433.48 4.4% $241,200.00 9.7% $165,000.00 6.4% $160,000.00 5.9% $115,000.00 $130,579.18 6.0% $228,300.00 9.2% $275,000.00 10.7% $145,000.00 5.3% $157,380.00 $160,584.06 7.4% $121,200.00 4.9% $192,500.00 7.5% $48,000.00 1.8% $70,000.00 $92,951.83 4.3% $34,800.00 1.4% $44,000.00 1.7% $40,000.00 1.5% $40,524.58 $43,731.16 2.1% $68,300.00 2.7% $86,250.00 3.3% $55,000.00 2.0% $106,054.00 $106,962.34 5.4% $93,400.00 3.8% $192,500.00 7.5% $94,000.00 3.4% $62,500.00 $71,067.30 3.2% $84,900.00 3.4% $33,000.00 1.3% $38,000.00 1.4% $52,816.50 $67,866.68 3.2% $166,800.00 6.7% $115,000.00 4.5% $265,000.00 9.7% $130,469.39 $142,291.72 6.7% $191,000.00 7.7% $218,500.00 8.5% $180,000.00 6.6% $178,496.43 $194,400.53 9.3% $148,600.00 6.0% $224,150.00 8.7% $450,000.00 16.5% $145,250.00 $174,736.81 8.2% $115,000.00 4.6% $92,000.00 3.6% $85,000.00 3.1% $85,000.00 $78,727.77 3.6% $255,000.00 10.3% $230,000.00 8.9% $200,000.00 7.3% $220,000.00 $221,957.12 10.6% $27,200.00 1.1% $16,500.00 0.6% $15,000.00 0.5% $15,000.00 $19,063.28 0.9% $64,000.00 2.6% $230,000.00 8.9% $144,000.00 5.3% $42,000.00 $79,289.01 3.6% $22,000.00 0.9% $17,250.00 0.7% $15,000.00 0.5% $20,000.00 $24,450.23 1.1% $48,800.00 2.0% $69,000.00 2.7% $10,000.00 0.4% $32,000.00 $34,639.34 1.6% $2,487,000.00 $2,575,000.00 $2,733,000.00 $2,185,000.00 $2,131,759.25 Bid Review AA Modern General Contractors Inc. First Trade Leonida Builders Inc