Bid Item Description Units
Estimated
Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
BASE BID ITEMS
1 Mobilization LS 1 $260,000.00 $260,000.00 $173,000.00 $173,000.00 150,917.20 $ 150,917.20 $ 298,500.00 $ 298,500.00 $ 350,000.00 $ 350,000.00 $ 54,600.00 $ 54,600.00 $ 625,000.00 $ 625,000.00 $ 199,397.51 $ 199,397.51 $ 2 Traffic Control System LS 1 $200,000.00 $200,000.00 $173,000.00 $173,000.00 300,000.00 $ 300,000.00 $ 260,280.00 $ 260,280.00 $ 94,279.00 $ 94,279.00 $ 130,200.00 $ 130,200.00 $ 460,179.81 $ 460,179.81 $ 955,000.00 $ 955,000.00 $ 3 Water Pollution Control LS 1 $15,000.00 $15,000.00 $11,000.00 $11,000.00 30,000.00 $ 30,000.00 $ 4,965.06 $ 4,965.06 $ 6,546.00 $ 6,546.00 $ 36,400.00 $ 36,400.00 $ 5,000.00 $ 5,000.00 $ 7,500.00 $ 7,500.00 $ 4 Construction Surveying and Staking LS 1 $20,000.00 $20,000.00 $18,000.00 $18,000.00 20,000.00 $ 20,000.00 $ 43,450.00 $ 43,450.00 $ 19,231.00 $ 19,231.00 $ 17,300.00 $ 17,300.00 $ 17,000.00 $ 17,000.00 $ 17,000.00 $ 17,000.00 $ 5 Changeable Message Signs EA 5 $5,000.00 $25,000.00 $5,100.00 $25,500.00 7,500.00 $ 37,500.00 $ 3,900.00 $ 19,500.00 $ 871.00 $ 4,355.00 $ 3,000.00 $ 15,000.00 $ 2,000.00 $ 10,000.00 $ 2,000.00 $ 10,000.00 $ 6 Project Information Sign EA 2 $1,200.00 $2,400.00 $2,700.00 $5,400.00 2,500.00 $ 5,000.00 $ 1,500.00 $ 3,000.00 $ 2,985.00 $ 5,970.00 $ 3,100.00 $ 6,200.00 $ 750.00 $ 1,500.00 $ 2,000.00 $ 4,000.00 $ 7 Furnish/Install Survey Monument per COM std. no. 617B AND 617C EA 9 $1,300.00 $11,700.00 $1,280.00 $11,520.00 1,500.00 $ 13,500.00 $ 1,250.00 $ 11,250.00 $ 3,007.00 $ 27,063.00 $ 1,275.00 $ 11,475.00 $ 2,750.00 $ 24,750.00 $ 1,250.00 $ 11,250.00 $ 8 Adjust Existing Survey Monument to Grade EA 9 $2,200.00 $19,800.00 $1,000.00 $9,000.00 2,000.00 $ 18,000.00 $ 600.00 $ 5,400.00 $ 1,414.00 $ 12,726.00 $ 1,275.00 $ 11,475.00 $ 2,300.00 $ 20,700.00 $ 2,250.00 $ 20,250.00 $ 9 Single Adjust Manhole EA 28 $900.00 $25,200.00 $1,130.00 $31,640.00 800.00 $ 22,400.00 $ 2,000.00 $ 56,000.00 $ 716.00 $ 20,048.00 $ 790.00 $ 22,120.00 $ 775.00 $ 21,700.00 $ 750.00 $ 21,000.00 $ 10 Double Adjust Manhole EA 16 $1,800.00 $28,800.00 $2,000.00 $32,000.00 1,300.00 $ 20,800.00 $ 800.00 $ 12,800.00 $ 1,332.00 $ 21,312.00 $ 1,580.00 $ 25,280.00 $ 1,550.00 $ 24,800.00 $ 1,500.00 $ 24,000.00 $ 11 Remove and Dispose of Asphalt Concrete Pavement (Digouts on Jefferson Ave.) SF 120135 $1.50 $180,202.50 $1.40 $168,189.00 1.80 $ 216,243.00 $ 1.00 $ 120,135.00 $ 1.40 $ 168,189.00 $ 3.02 $ 362,807.70 $ 2.35 $ 282,317.25 $ 1.80 $ 216,243.00 $ 12 Remove and Dispose of Asphalt Concrete Pavement (Digouts on Clinton Keith Rd.) SF 128572 $1.50 $192,858.00 $1.65 $212,143.80 1.90 $ 244,286.80 $ 1.00 $ 128,572.00 $ 1.08 $ 138,857.76 $ 3.03 $ 389,573.16 $ 2.45 $ 315,001.40 $ 1.90 $ 244,286.80 $ 13 Cold Milling Asphalt Concrete Pavement Full Width at 2" Depth SY 31085 $3.25 $101,026.25 $4.05 $125,894.25 2.75 $ 85,483.75 $ 2.00 $ 62,170.00 $ 2.34 $ 72,738.90 $ 2.45 $ 76,158.25 $ 3.00 $ 93,255.00 $ 3.20 $ 99,472.00 $ 14 Cold Milling Asphalt Concrete Pavement 6' Header Grind at 2" Depth SY 21529 $3.25 $69,969.25 $2.05 $44,134.45 2.15 $ 46,287.35 $ 2.00 $ 43,058.00 $ 1.94 $ 41,766.26 $ 1.81 $ 38,967.49 $ 2.25 $ 48,440.25 $ 2.40 $ 51,669.60 $ 15 Remove Existing AC Dike (Ranges from 4" to 6") LF 900 $3.25 $2,925.00 $2.00 $1,800.00 3.00 $ 2,700.00 $ 1.50 $ 1,350.00 $ 2.10 $ 1,890.00 $ 2.20 $ 1,980.00 $ 2.15 $ 1,935.00 $ 5.00 $ 4,500.00 $ 16 ARHM Overlay 2" TON 16393 $122.00 $1,999,946.00 $123.60 $2,026,174.80 125.00 $ 2,049,125.00 $ 144.00 $ 2,360,592.00 $ 147.00 $ 2,409,771.00 $ 135.00 $ 2,213,055.00 $ 125.00 $ 2,049,125.00 $ 137.00 $ 2,245,841.00 $ 17 ARHM Overlay 2.25" TON 3445 $122.00 $420,290.00 $123.60 $425,802.00 125.00 $ 430,625.00 $ 148.00 $ 509,860.00 $ 145.00 $ 499,525.00 $ 135.00 $ 465,075.00 $ 125.00 $ 430,625.00 $ 137.00 $ 471,965.00 $ 18 Asphalt Concrete Pavement for Removal and Replacement of AC (Digouts) TON 9116 $105.00 $957,180.00 $128.00 $1,166,848.00 130.00 $ 1,185,080.00 $ 137.00 $ 1,248,892.00 $ 128.00 $ 1,166,848.00 $ 155.00 $ 1,412,980.00 $ 145.00 $ 1,321,820.00 $ 130.00 $ 1,185,080.00 $ 19 Construct 6" AC Dike per City STD. 315 LF 900 $19.00 $17,100.00 $14.00 $12,600.00 20.00 $ 18,000.00 $ 15.00 $ 13,500.00 $ 11.00 $ 9,900.00 $ 10.25 $ 9,225.00 $ 14.00 $ 12,600.00 $ 15.00 $ 13,500.00 $ 20 Rubber Polymer Modified Slurry (RPMS) - Type II SF 7114 $2.90 $20,630.60 $3.30 $23,476.20 2.50 $ 17,785.00 $ 2.20 $ 15,650.80 $ 1.90 $ 13,516.60 $ 2.85 $ 20,274.90 $ 3.00 $ 21,342.00 $ 3.60 $ 25,610.40 $ 21 Furnish/Install Detector Loop EA 283 $625.00 $176,875.00 $470.00 $133,010.00 550.00 $ 155,650.00 $ 691.95 $ 195,821.85 $ 622.00 $ 176,026.00 $ 470.00 $ 133,010.00 $ 470.00 $ 133,010.00 $ 459.00 $ 129,897.00 $ 22 Furnish and Install #5 Pullbox, Connect DLC for Traffic Loops EA 9 $1,400.00 $12,600.00 $1,230.00 $11,070.00 1,500.00 $ 13,500.00 $ 1,437.50 $ 12,937.50 $ 1,584.00 $ 14,256.00 $ 1,250.00 $ 11,250.00 $ 700.00 $ 6,300.00 $ 1,200.00 $ 10,800.00 $ 23 Furnish and Install 2" Conduit Under Sidewalk Panels or as Shown LF 421 $48.00 $20,208.00 $138.00 $58,098.00 200.00 $ 84,200.00 $ 206.85 $ 87,083.85 $ 224.00 $ 94,304.00 $ 138.00 $ 58,098.00 $ 170.00 $ 71,570.00 $ 135.00 $ 56,835.00 $ 24 Furnish and Install DLC. Connect Loops to Existing Traffic Cabinet LF 17080 $3.00 $51,240.00 $3.40 $58,072.00 1.50 $ 25,620.00 $ 2.59 $ 44,237.20 $ 1.70 $ 29,036.00 $ 3.35 $ 57,218.00 $ 3.00 $ 51,240.00 $ 3.28 $ 56,022.40 $ 25 Pavement Striping Detail 9 LF 1348 $0.46 $620.08 $0.50 $674.00 0.45 $ 606.60 $ 0.51 $ 687.48 $ 0.50 $ 674.00 $ 0.45 $ 606.60 $ 0.44 $ 593.12 $ 0.44 $ 593.12 $ 26 Pavement Striping Detail 12 LF 36181 $0.46 $16,643.26 $0.50 $18,090.50 0.45 $ 16,281.45 $ 0.51 $ 18,452.31 $ 0.50 $ 18,090.50 $ 0.45 $ 16,281.45 $ 0.44 $ 15,919.64 $ 0.44 $ 15,919.64 $ 27 Pavement Striping Detail 22 LF 5651 $0.87 $4,916.37 $0.90 $5,085.90 0.85 $ 4,803.35 $ 0.97 $ 5,481.47 $ 0.95 $ 5,368.45 $ 0.90 $ 5,085.90 $ 0.84 $ 4,746.84 $ 0.84 $ 4,746.84 $ 28 Pavement Striping Detail 25 LF 8682 $0.68 $5,903.76 $0.70 $6,077.40 0.65 $ 5,643.30 $ 0.75 $ 6,511.50 $ 0.74 $ 6,424.68 $ 0.70 $ 6,077.40 $ 0.65 $ 5,643.30 $ 0.65 $ 5,643.30 $ 29 Pavement Striping Detail 27B LF 2657 $0.62 $1,647.34 $0.60 $1,594.20 0.65 $ 1,727.05 $ 0.69 $ 1,833.33 $ 0.68 $ 1,806.76 $ 0.65 $ 1,727.05 $ 0.60 $ 1,594.20 $ 0.60 $ 1,594.20 $ 30 Pavement Striping Detail 29 LF 12910 $0.85 $10,973.50 $0.90 $11,619.00 0.85 $ 10,973.50 $ 0.94 $ 12,135.40 $ 0.93 $ 12,006.30 $ 0.85 $ 10,973.50 $ 0.82 $ 10,586.20 $ 0.82 $ 10,586.20 $ 31 Pavement Striping Detail 32 LF 6637 $0.85 $5,641.45 $0.90 $5,973.30 0.85 $ 5,641.45 $ 0.94 $ 6,238.78 $ 0.93 $ 6,172.41 $ 0.85 $ 5,641.45 $ 0.82 $ 5,442.34 $ 0.82 $ 5,442.34 $ 32 Pavement Striping Detail 37B LF 1755 $0.94 $1,649.70 $0.90 $1,579.50 1.00 $ 1,755.00 $ 1.04 $ 1,825.20 $ 1.02 $ 1,790.10 $ 0.95 $ 1,667.25 $ 0.90 $ 1,579.50 $ 0.90 $ 1,579.50 $ 33 Pavement Striping Detail 38 LF 7290 $0.94 $6,852.60 $0.90 $6,561.00 1.00 $ 7,290.00 $ 1.04 $ 7,581.60 $ 1.02 $ 7,435.80 $ 0.95 $ 6,925.50 $ 0.90 $ 6,561.00 $ 0.90 $ 6,561.00 $ 34 Pavement Striping Detail 39 LF 25296 $0.68 $17,201.28 $0.70 $17,707.20 0.70 $ 17,707.20 $ 0.75 $ 18,972.00 $ 0.74 $ 18,719.04 $ 0.70 $ 17,707.20 $ 0.65 $ 16,442.40 $ 0.65 $ 16,442.40 $ 35 Pavement Striping Detail 39A LF 6320 $0.52 $3,286.40 $0.50 $3,160.00 0.55 $ 3,476.00 $ 0.58 $ 3,665.60 $ 0.57 $ 3,602.40 $ 0.51 $ 3,223.20 $ 0.50 $ 3,160.00 $ 0.50 $ 3,160.00 $ 36 Pavement Striping 6" Solid White Lane Line LF 4020 $0.68 $2,733.60 $0.70 $2,814.00 0.70 $ 2,814.00 $ 0.75 $ 3,015.00 $ 0.74 $ 2,974.80 $ 0.66 $ 2,653.20 $ 0.65 $ 2,613.00 $ 0.65 $ 2,613.00 $ 37 Painted Bike Lane Symbol with Person Pavement Marking and Bike Lane Arrow SF 641 $5.20 $3,333.20 $5.00 $3,205.00 6.00 $ 3,846.00 $ 5.75 $ 3,685.75 $ 5.66 $ 3,628.06 $ 5.10 $ 3,269.10 $ 5.00 $ 3,205.00 $ 5.00 $ 3,205.00 $ 38 Thermoplastic Pavement Marking "SIGNAL" and "AHEAD" SF 567 $7.50 $4,252.50 $8.00 $4,536.00 8.00 $ 4,536.00 $ 8.34 $ 4,728.78 $ 8.20 $ 4,649.40 $ 7.40 $ 4,195.80 $ 7.25 $ 4,110.75 $ 7.25 $ 4,110.75 $ 39 Thermoplastic Pavement Marking "KEEP" and "CLEAR" SF 102 $7.50 $765.00 $8.00 $816.00 8.00 $ 816.00 $ 8.34 $ 850.68 $ 8.20 $ 836.40 $ 7.40 $ 754.80 $ 7.25 $ 739.50 $ 7.25 $ 739.50 $ 40 Thermoplastic Pavement Marking "STOP" and "AHEAD" SF 212 $7.50 $1,590.00 $8.00 $1,696.00 8.00 $ 1,696.00 $ 8.34 $ 1,768.08 $ 8.20 $ 1,738.40 $ 7.40 $ 1,568.80 $ 7.25 $ 1,537.00 $ 7.25 $ 1,537.00 $ 41 Thermoplastic Pavement Marking "STOP" SF 132 $7.50 $990.00 $8.00 $1,056.00 8.00 $ 1,056.00 $ 8.34 $ 1,100.88 $ 8.20 $ 1,082.40 $ 7.40 $ 976.80 $ 7.25 $ 957.00 $ 7.25 $ 957.00 $ 42 Thermoplastic Pavement Marking (Type IV Arrow) SF 1485 $7.30 $10,840.50 $7.10 $10,543.50 8.00 $ 11,880.00 $ 8.05 $ 11,954.25 $ 7.92 $ 11,761.20 $ 7.15 $ 10,617.75 $ 7.00 $ 10,395.00 $ 7.00 $ 10,395.00 $ 43 Thermoplastic Pavement Marking (Type VI Arrow) SF 378 $7.30 $2,759.40 $7.10 $2,683.80 8.00 $ 3,024.00 $ 8.05 $ 3,042.90 $ 7.92 $ 2,993.76 $ 7.15 $ 2,702.70 $ 7.00 $ 2,646.00 $ 7.00 $ 2,646.00 $ 44 Thermoplastic Pavement Marking (Type I Arrow) SF 75 $7.30 $547.50 $7.10 $532.50 8.00 $ 600.00 $ 8.05 $ 603.75 $ 7.92 $ 594.00 $ 7.15 $ 536.25 $ 7.00 $ 525.00 $ 7.00 $ 525.00 $ 45 Thermoplastic Pavement Marking (12" White) SF 2770 $6.25 $17,312.50 $6.10 $16,897.00 7.00 $ 19,390.00 $ 6.90 $ 19,113.00 $ 6.79 $ 18,808.30 $ 6.10 $ 16,897.00 $ 6.00 $ 16,620.00 $ 6.00 $ 16,620.00 $ 46 Thermoplastic Pavement Marking (12" Yellow) SF 776 $6.25 $4,850.00 $6.10 $4,733.60 7.00 $ 5,432.00 $ 6.90 $ 5,354.40 $ 6.79 $ 5,269.04 $ 6.10 $ 4,733.60 $ 6.00 $ 4,656.00 $ 6.00 $ 4,656.00 $ 47 Thermoplastic Ladder Crosswalk (Per Caltrans Std A24F) SF 594 $6.25 $3,712.50 $6.10 $3,623.40 7.00 $ 4,158.00 $ 6.90 $ 4,098.60 $ 6.79 $ 4,033.26 $ 6.10 $ 3,623.40 $ 6.00 $ 3,564.00 $ 6.00 $ 3,564.00 $ 48 Paint Green Methyl Metacrylate Bike Lane SF 1410 $11.00 $15,510.00 $10.70 $15,087.00 12.00 $ 16,920.00 $ 12.13 $ 17,103.30 $ 12.00 $ 16,920.00 $ 10.75 $ 15,157.50 $ 10.55 $ 14,875.50 $ 10.55 $ 14,875.50 $ 49 Install Type Q (CA) Object Markers with White Retroreflective Sheeting EA 4 $240.00 $960.00 $230.00 $920.00 250.00 $ 1,000.00 $ 258.75 $ 1,035.00 $ 255.00 $ 1,020.00 $ 230.00 $ 920.00 $ 225.00 $ 900.00 $ 225.00 $ 900.00 $ 50 Install Sign Type R7-9(MOD) EA 10 $425.00 $4,250.00 $420.00 $4,200.00 500.00 $ 5,000.00 $ 471.50 $ 4,715.00 $ 464.00 $ 4,640.00 $ 420.00 $ 4,200.00 $ 410.00 $ 4,100.00 $ 410.00 $ 4,100.00 $ 51 Install Geogrid Reinforcement (within Asphalt Digouts) SF 37306 $1.40 $52,228.40 $2.60 $96,995.60 4.00 $ 149,224.00 $ 0.95 $ 35,440.70 $ 5.57 $ 207,794.42 $ 6.75 $ 251,815.50 $ 2.50 $ 93,265.00 $ 3.00 $ 111,918.00 $
ADDITIVE BID ITEMS
52 Single Adjust Manhole (EMWD) EA 9 $1,000.00 $9,000.00 $1,130.00 $10,170.00 1,800.00 $ 16,200.00 $ 1,000.00 $ 9,000.00 $ 895.00 $ 8,055.00 $ 790.00 $ 7,110.00 $ 775.00 $ 6,975.00 $ 950.00 $ 8,550.00 $ 53 Single Adjust Manhole (EVMWD) EA 26 $1,000.00 $26,000.00 $1,130.00 $29,380.00 1,800.00 $ 46,800.00 $ 1,000.00 $ 26,000.00 $ 917.00 $ 23,842.00 $ 790.00 $ 20,540.00 $ 775.00 $ 20,150.00 $ 950.00 $ 24,700.00 $ $5,067,921.44 $5,245,383.90 5,563,000.00 $ 5,795,000.00 $ 5,800,885.40 $ 6,007,911.20 $ 6,313,313.00 $ 6,370,000.00 $ Vance Coporation Calmex Engineering Inc. Romero General Construction Corp. Onyx Paving Company
JEFFERSON AVENUE AND CLINTON KEITH ROAD PAVEMENT REHABILITAION PROJECT CITY PROJECT NO. 25-492 (CIP 13072)
BIDS OPENED: 7/30/26 @ 3:00 P.M.
TOTAL BID PRICE
R.J. Noble Company All American Asphalt Hardy & Harper, Inc. Eagle Paving LLC