BIG RANCH ROAD WIDENING
PRELIMINARY DESIGN
PUBLIC WORKS DEPARTMENT
SHEETS:
DATE:
MAY 2023
CHECKED BY:
OF
1 DRAWN BY:
RNC
1 LEGEND
SIDEWALK, CURB AND GUTTER
IMPROVEMENTS
STREET WIDENING AREA
EXISTING LOT LINE
EXISTING EDGE OF PAVEMENT
PROPOSED RIGHT-OF-WAY (ROW)
PROPOSED STRIPING
PROPOSED STREET SECTION
NOT TO SCALE
0 0
20'
40'
SCALE: 1" = 40'
10'
SW/LS
11'
TRAVEL
5'
BIKE
12'
TRAVEL
81' R/W
RIGHT-OF-WAY
RIGHT-OF-WAY
13'
TWO-WAY TURN
11'
TRAVEL
5'
12'
11'
11'
13'
ATTACHMENT 1