Community Development Department – Planning Division
1600 First Street + P.O. Box 660
Napa, CA 94559-0660
(707) 257-9530
_________________________________________________________________________________________________
PLANNING COMMISSION STAFF REPORT
FEBRUARY 1, 2024
AGENDA ITEM 7.A File No. PL22-0137 FIRST & OXBOW HOTEL DESIGN REVIEW & USE PERMIT
I. GENERAL INFORMATION
PROJECT
SUMMARY:
Application for a Design Review Permit and Use Permit to authorize construction of a 123 -room hotel consisting of two four -story buildings, which includes ancillary hotel guest and public -serving uses, and below-grade parking.
LOCATION OF
PROPERTY:
730 Water Street
APNs: 003-235-002, -003, -004, -005, -006, -007 and 003-241-003, -005, -006
GENERAL PLAN:
Oxbow Commercial (OBC)
ZONING:
Oxbow Commercial (OBC), Floodplain Management Overlay (FP), Soscol Corridor Overlay (SC), Traffic Impact Overlay (TI)
APPLICANT: Stratus Development Partners, LLC
Attn: Andrew Wood
17 Corporate Plaza Drive, #200
Newport Beach, CA 92660
Phone: (949) 422-6231
OWNER: Foxbow Development, LLC
Attn: James B. Leamer
485 Technology Way
Napa, CA 94558
Phone: (415) 286-3126
OWNER:
Foxbow 1, LLC/
PT-Five Investments, L.P.
Attn: Timothy Herman
3411 Willis Drive
Napa, CA 94558
Email:
[email protected]
ATTACHMENTS: ATCH 1 – Draft Resolution
ATCH 2 – Project Description
ATCH 3 – Project Plans
ATCH 4 – Elevations and Renderings
ATCH 5 – Design Review Updates
ATCH 6 – On-Site Parking Letter
ATCH 7 – Operations Memorandum
ATTACHMENT 15
PL22-0137 – First & Oxbow Hotel DR & UP 2
ATCH 8 – Porter Vehicle
ATCH 9 – Economic Impact Analysis
ATCH 10 – CEQA Memorandum
ATCH 11 – PC Staff Report - PL16-0124
ATCH 12 – Extension Approval Letter (8-31-2022)
ATCH 13 – 2020 Addendum
II. RECOMMENDATION
Staff recommends that the Planning Commission forward a recommendation to the City Council to adopt a resolution approving a Design Review Permit and Use Permit to authorize construction of a 123 -room hotel consisting of two four-story buildings, which includes ancillary hotel guest and public-serving uses, and below-grade parking at 730 Water Street , and determining that the actions authorized by the resolution were adequately analyzed by a previous California Environmental Quality Act (CEQA) action.
III. EXECUTIVE SUMMARY
The Applicant, Stratus Development Partners, LLC , requests a Design Review Permit and Use Permit to authorize construction of a 123-room hotel consisting of two four-story buildings, which includes ancillary hotel guest and public serving uses, and below-grade parking (“Project”). If approved, t he Project would supersede the previously approved Design Review Permit and Use Permit for the First and Oxbow Hotel (PL16-0124; City Council Resolution R2020-134, approved by City Council on November 17, 2020), for 74 rooms and ground floor retail . The Project is located at 730 Water Street, as shown in Figure 1, Location Map.
FIGURE 1
Location Map
ATTACHMENT 15
PL22-0137 – First & Oxbow Hotel DR & UP 3
While a more complete project description is provided below under “Project Description,” and provided in Attachment 2, Project Description , a summary of the proposed changes between the originally approved project and the proposed Project is listed below, as shown in Table 1, Summary of Changes.
TABLE 1
Summary of Changes
Approved 2020 Proposed Project Changes
Hotel Rooms 74 123 49
Retail (square feet) 6,294 -- (6,294)
Meeting/Conference
Space (square feet)
5,754 3,375 (2,199)
Parking Spaces 121 154 33
Building Height
(feet)
60 60 No Change
Building Size
(square feet)
184,106 151,224 (32,882)
IV. SITE CONTEXT AND HISTORY
The Project site is approximately 0.71 acres and is composed of multiple parcels located at the southeast corner of Soscol Avenue and First Street, and First Street and the railroad.
The properties are bounded by Soscol Avenue, First Street, Water Street, and the Napa River. The Project, if approved, would impact adjacent property not under the Applicant’s ownership, including City of Napa (City) rights-of-ways and Napa County Flood Control and Water Conservation District (Flood Control District) property. As part of the project, the Applicant has requested that the City abandon a portion of the Water Street right-of-way between Soscol Avenue and McKinstry Street and of the La wrence Street right-of-way between First Street and the Water Street right-of-way.
The Napa Valley Wine Train railroad tracks generally divide the project site into two (2) areas. The western side of the tracks is currently vacant containing vegetation and trees, and the eastern side of the tracks are currently developed with three (3) single-story, single- family residence s, a one-story commercial structure, and two (2) small accessory structures.
The overall site begins at the western boundary and entrance to the area referred to as the “Oxbow District” in the Napa 2040 General Plan. Surrounding land uses include commercial retail, and office to the north, single-family residential and commercial retail and restaurant to the east, Napa River and existing warehouse buildings containing event and transportation to the south, and Soscol Avenue, Oxbow Commons, and Napa River to the west.
A. PL16-0124 First and Oxbow Hotel
The original entitlements (PL16-0124) were approved by City Council on November 17, 2020 (City Council Resolution R2020-134) and granted a two-year extension (PL22-0102) on August 31, 2022.
ATTACHMENT 15
PL22-0137 – First & Oxbow Hotel DR & UP 4
As further described in Attachment 11, PC Staff Report - PL16-0124, the original project consisted of two, four -story buildings totaling approximately 184,106 square feet accommodating 74 guest rooms (up to 37 in each building) . The west building included 2,787 square feet of commercial tenant space that could accommodate five (5) commercial tenants, along with pool and fitness facilities. The east building included 3,507 square feet of commercial tenant space for up to six (6) commercial tenants and 5,754 square feet of conference and meeting space. Both buildings included outdoor bars on their top floors.
In addition, the original project also included 121 parking spaces divided between each building’s two-level subterranean garage , laundry, and housekeeping facilities in each building, along with an improved pedestrian path between First Street and Water Street parallel to the railroad. The original application included the following entitlements:
1. Design Review Permit: For a 74-room hotel consisting of two, four-story buildings totaling 184,106 square feet on two sites divided by the Wine Train railroad at the southeast corner of the intersection of First Street and Soscol Avenue. The Design Review Permit was approved by Council Resolution No. R2020-134.
2. Use Permit : For authorization of a hotel use in the OBC , Oxbow Commercial District, where a Use Permit is required for hotels pursuant to the NMC 17.10.020.
The Applicant is requesting a Use Permit to increase the number of hotel rooms from 74-to-123 rooms. The Use Permit was ap proved by Council Resolution No.
R2020-134.
3. Certificate of Appropriateness: For relocation of two Local Landmark structures from 718 Water Street and 731 First Street to 58 Randolph Street. The Certificate of Appropriateness was approved by Council Resolution No. R2020-135. The previously approved Certificate of Appropriateness would remain in effect.
4. Right-of-Way Abandonment: For abandonment of a portion of the Water Street right-of-way between Soscol Avenue and McKinstry Street and of the Lawrence Street right -of-way between First Street and the Water Street right -of-way.
Lawrence Street and the portion of Water Street west of the Napa River are paper streets. The portion of Water Street east of the Napa River is a dead -end street.
The conditional abandonment was approved by Council Resolution No . R2020- 137 and allowed for the enlargement of the project site to allow larger buildings and for the conversion of the public street to a smaller access drive while maintaining public access. The abandonment of right-of-way would be reconsidered as part of a separate action by City Council.
5. Lot Line Adjustment/Lot Merger: Combination of all parcels on the west side of the railroad into a single parcel and all parcels on the east side of the railroad into a single parcel. The lot line adjustment/lot merger was never approved. However, in conjunction with the new entitlements and the right -of-way abandonment, the additional land area would be reconfigured to accommodate the project, and each building would be on a separate parcel separated by the railroad. The lot line adjustment/lot merger would be approved administratively should the City Council approve the revised project and the abandonment.
ATTACHMENT 15
PL22-0137 – First & Oxbow Hotel DR & UP 5
B. PL22-0102 First & Oxbow Extension I
City staff approved the first two-year extension administratively (PL22-0102) on August 31, 2022, which extended the entitlement (PL16-0124) to November 17, 2024 (Attachment 12, Extension Approval Letter (8-31-2022)).
V. PROJECT DESCRIPTION
The Applicant requests a Design Review Permit and Use Permit to authorize construction of a 123-room hotel consisting of two four-story buildings totaling approximately 151,224 square feet on lots that total approximately 0.71 acres. Of the 123 rooms, 54 rooms would be in the west building, and 69 would be in the east building.
The Project would include various amenities common to hotel use such as pool and fitness facilities in the west building facing both the Napa River and First Street frontage, respectively. The hotel would provide approximately 3,375 square feet of conference and meeting space split between the two buildings. Both buildings would also feature auxiliary bars and food service areas managed by the hotel operator, yet accessible to hotel guests and members of the public.
The hotel would provide 154 parking spaces divided between each building’s single-level below-grade garage. Each building would be served by its own housekeeping facilities with further operational details described below in Section V.H . There would be an improved path between First Street and Water Street adjacent to and parallel to the railroad.
C. Amendments
As described in Attachment 5, Design Review Updates , the Applicant proposes a similar building footprint, setbacks, site design , height, and access as the originally approved plans while partially reducing the overall massing of the west building and decreasing the below-grade parking levels from two levels to one level. The Applicant also proposes reconfiguration of the internal space and remov al of the retail space to accommodate the additional rooms.
D. Site Design
The site design for the Project is generally consistent with the original approval. The site is bisected by the Napa Valley Wine Train railroad tracks and fronts both First Street extending east from downtown and Soscol Avenue, with traffic heading north and south.
The west building would face the Napa River towards the rear and the east building faces a dead-end street.
Both the west and north street adjacent sidewalk along Soscol Avenue and First Street feature wide sidewalks with the primary pedestrian entrances for both buildings located along First Street. The Project proposes a 13-foot-wide walkway between the east building and the railroad to provide a cut -through for people to access Water Street and connect to the future river-adjacent path and pedestrian bridge. The service entrance for the east building is accessed from Water Street, with the entrance for the west building along First Street adjacent to the railroad tracks.
ATTACHMENT 15
PL22-0137 – First & Oxbow Hotel DR & UP 6
E. Elevations
The Project proposes an overall height of 60 feet, similar to the previous project, along with a similar style of elevation. However, the proposed Project would provide for a slightly reduced building mass by featuring an approximately 30-to-60-foot step back of the fourth floor of the western building to allow for a rooftop patio that faces up-valley to the northwest.
The facades would contain mid-elevation bay windows, and Romeo and Juliet balconies with plantings along the handrails . The corners would also feature private patios with glass door access. The siding would be composed of a variation of Woodtone lap siding with a grain finish , light beige stucco, and board-formed concrete at ground flo or and garage levels. The Applicant is also proposing to swap the yellow awning as shown in the original plans for a dark-brown awning for aesthetic and long-term maintenance reasons, as shown in Attachment 4, Elevations and Renderings . The Project would include additional awnings above some of the east, south, and west facing windows to provide additional shading. The remaining windows along the east, south, and west -facing facades would also feature window trellises for additional variation.
Due to the reconfiguration of the ground floor levels in both the west and east building, the Applicant proposes a reduction in the amount of window glazing to provide for greater back-of-house service, equipment, and storage areas along the southeast side (rear) of both buildings; however, the rear of the west building would feature a pool area for all hotel patrons and a south-facing quasi-open atrium extending from the second to the third floor with a direct view of the Napa River.
F. Parking & Circulation
The Applicant proposes to reduce the below-grade parking levels from two-levels to one- level, while increasing the number of parking spaces from 121 to 154 parking spaces.
The Project, as amended, would utilize mechanical parking stackers as further described in Attachment 6, On-Site Parking Letter, to fit vehicles more efficiently while reducing the amount of soil needing to be excavated from the site. The parking facilities would not be accessible by members of the public or hotel patrons; instead, the facilities would only be accessible by the hotel operator and appropriately trained hotel staff members.
NMC Section 17.54.040, defers to Chapter 6 of the D owntown Napa Specific Plan (“DNSP”) to regulate parking for properties located within the DNSP boundaries. The DNSP specifies the following parking ratio for hotel uses: 1 space per sleeping room plus 1 space for the manager and 1 space for every 2 employees (full or part time), plus if the hotel has convention, banquet, restaurant or meeting facilities, parking shall be provided in addition to the hotel requirement, as determined by the Planning Commission. Staff recommends that the Planning Commission apply the general parking requirement for commercial space in the DNSP of 3.2 spaces per 1,000 square feet to this small meeting space. Table 2, below, illustrates the total required parking.
ATTACHMENT 15
PL22-0137 – First & Oxbow Hotel DR & UP 7
TABLE 2
Required vs. Provided Parking
DNSP Parking Requirements Parking Required
1 space per sleeping room 123 spaces
1 space for manager 1 space
1 space for every 2 employees (32 employees) 16 spaces
3,375 sq. ft. commercial space @ 3.2 per 1,000 sq. ft. 10.8 spaces Total Required 151 spaces
Total Provided 154 spaces
Vehicular access to the western building and eastern building parking garages will remain consistent with the original Project and would be accessed via a ramp leading from First Street, just west of the railroad tracks, and via a ramp leading down from Water Street on the south side of the building, respectively.
G. Landscaping
The Applicant is not proposing to alter any of the site landscaping shown in the original Project approval. The site would featu re street trees and low hedges defining the semi - public street-side space. Both buildings would be constructed with centered atriums and trees in the middle starting on the second floor. The balconies and private patio spaces would also feature additional plantings along the handrails to help soften the façade.
The Project would require the Applicant to remove one (1) Coast Live Oak that is classified as a Protected Native Tree pursuant to NMC Chapter 12.45. The removal of the protected native tree may be authorized by the City Council pursuant to NMC Section
12.45.090; however, the Applicant would be required to satisfy the replacement criteria as described in NMC Section 12.45.100.
H. Operations
The hotel buildings would be located on separate parcels bisected by railroad tracks, but function as one hotel. Operations such as valet , deliveries, laundry services, luggage, food services, trash collection, and transportation would be shared between the buildings.
As further described in Attachment 7, Operations Memorandum, functions such as deliveries, laundry, and trash collection would require the use of a street legal porter vehicle (see Attachment 8, Porter Vehicle) transporting goods or refuse along the public streets from building to building. Food service is not contemplated to travel between buildings; however, luggage may be transported from the east building to the west building via a non -motorized luggage cart along the sidewalk and across the railroad tracks.
All valet drop-off and pick up would occur at the east building in a designated unloading and loading area. To prevent excessive queuing along First Street, guests would pick up their vehicles staged at the garage opening on Water Street for the east building.
ATTACHMENT 15
PL22-0137 – First & Oxbow Hotel DR & UP 8
I. Public Art
The Applicant has expressed interest in installing a public art feature, but an artist or design concept has not yet been identified at this stage . However, t he Applicant has indicated that it no longer intends to pursue construction and placement of the “arrow” art contemplated in the original Project approval.
Pursuant to NMC Section 15.108.040, the Applicant would be required to have (1) an on- site public art feature approved by Council, (2) request City Council consider placement of a developer-funded piece in a public place nearby - which is identified in the public art master plan, (3) pay the public art contribution, or (4) install public art on the development project site that has a value lower than the public art contribution amount and make an in-lieu contribution for the balance of the public art contribution . The Applicant shall demonstrate compliance with NMC Chapter 15.108 prior to obtaining a building permit for construction of the development project.
VI. ANALYSIS
A. General Plan
The property is located within the Oxbow Commercial General Plan Designation of the Napa 2040 General Plan . The Oxbow Commercial land use designation and zoning district applies to the eastern portion of Downtown generally between Soscol Avenue and the Napa River and north to River Terrace Drive. The Oxbow Commercial land use designation and zoning district allows for uses oriented to tourists such as hotels and their related amenities; recreational facilities; community and visitor-serving retail, commercial, entertainment and restaurants; and similar compatible uses in addition to residential and live/work opportunities. The Project would provide for a use oriented towards tourists and would be compatible with and support adjacent community and visitor -serving retail, commercial, entertainment and restaurant businesses in the Oxbow District and greater downtown area. The Project would be consistent with the following goals outlined in the Napa 2040 General Plan:
• Policy LUCD 13-1 Promote infill development in Focus Areas that makes efficient use of limited land supply, while ensuring compatibility and integration with adjacent uses.
Ensure that uses and intensities of infill development support a cohesive development pattern.
• Policy LUCD 18-6 Continue development of the pedestrian/bike trail network, including access to the Vine Trail along the Napa River; require new development to connect to trails when consistent with the City of Napa Bicycle Plan.
• Policy ED 6 -1 Continue to support tourism and the development of visitor -serving components to the City’s economy as a valuable source of jobs, tax revenues, and cultural amenities.
ATTACHMENT 15
PL22-0137 – First & Oxbow Hotel DR & UP 9
B. Downtown Napa Specific Plan & Zoning
The property is located within the boundaries of the Downtown Napa Specific Plan (DNSP) area and identified as OBC, Oxbow Commercial Zoning District. The OBC district applies to the eastern portion of Downtown generally between Soscol Avenue and the Napa River and north to River Terrace Drive. The District allows for tourist-oriented uses such as hotels and their related amenities, recreational facili ties, community and visitor- serving retail, commercial, restaurants, and similar compatible uses.
The site is also subject to the DNSP Building Form Overlay ( “BF Overlay”); “Downtown II”. Regulations established by the BF Overlay District are technically in addition to regulations of the underlying zone district with which it is combined. However, the OBC simply defers to the BF Overlay standards and does not prescribe any additional standards. As such, the following Table 3, Downtown II Development Standards , summarizes the project’s consistency with the subject development standards:
TABLE 3
Downtown II Development Standards
The Downtown II regulations establish a building form allowing for medium-to-high density development designed to be complimentary to the downtown core. While the massing and footprint of the proposed structure is consistent with the design of the original entitlement, neither the original building nor the proposed building feature a traditional stepback, as required by the DNSP, for the third story and above along the east side of the eastern building since that side of the building is facing an existing residential structure; however, the regulations do allow for the building to be constructed at the property line.
As proposed, the footprint of the building is approximately 10 feet from the property line.
With the partial wall plane projection , the third and fourth story would still be a greater distance from the property line than the DNSP requires.
The Project site is also located within the FP, Floodplain Management, SC, Soscol Corridor, and TI, Traffic Impact Zone Overlays, which require compliance with NMC Chapters 17.38, 17.46, and 17.48, respectively. The Project has been reviewed by the Public Works Department to ensure compliance with floodplain management and traffic- related regulations to ensure the Project is built in a safe manner. While the Project site is located within the boundaries of the Soscol Corridor/Downtown Riverfront Development and Design Guidelines , the design regulations in the DNSP supersede the alternate regulations.
Development Standards OBC District Project Proposed
Floor Area Ratio (FAR) 4.0 3.9
Building Height (feet) max. 60’ 60’
Front Setback (feet) 15’ maximum 10.8’
Side Setback (feet) n/a West: 15.9’
East: 10’
Rear Setback (feet) n/a 20’
ATTACHMENT 15
PL22-0137 – First & Oxbow Hotel DR & UP 10
C. Design Review
Pursuant to NMC Section 17.62.050, an application for a Design Review Permit is required for all hotels. To approve a Design Review Permit, the City Council is required to make the findings prescribed in NMC Section 17.62.080. Those findings are shown below under the “Findings” section, along with Staff’s analysis of each finding.
D. Use Permit
Pursuant to NMC Section 17.10.020, the OBC Zone District allows for a hotel subject to the approval of a Use Permit. Use Permits are required for land uses that may be suitable only in specific locations or require special consideration in their design, operation, or layout to ensure compatibility with surrounding uses. To approve a Use Permit, the City Council is required to make the findings prescribed in NMC Section 17.60.070. Those findings are shown below under the “Findings” section, along with Staff’s analysis of each finding.
E. Hotel Policies
The following is a discussion of how the project complies with the City’s Hotel Policies adopted in 2008.
1. A priority should be placed on the development of full-service and resort hotels downtown because of the ancillary and complementary benefits to other downtown uses and activities. This does not preclude the full range of additional lodging products in appropriate locations throughout the city.
The Project would house a full-service hotel including meeting rooms, and auxiliary bars and food service areas managed by the hotel operator, yet accessible to hotel guests and members of the public, that are part of a full-service hotel’s slate of services. It would be located within walking distance of the City’s top tourist attractions, including the fairgrounds that host the Bottle Rock Music Festival and its approximately 120,000 attendees.
2. Limited service hotels with meeting room space and close proximity to surrounding support services would be considered desirable. Bed and breakfasts and small inns as in-fill projects would be encouraged as indicated in the General Plan.
This policy is not applicable.
3. New hotel projects should provide a minimum of 15 -100 square feet of contiguous meeting room space per guest room depending on the type of hotel and location to facilitate and expand the group meeting demand.
The 123-room hotel would include 3,375 square feet of indoor conference space. This equates to approximately 27.43 square feet of conference space per guest room.
ATTACHMENT 15
PL22-0137 – First & Oxbow Hotel DR & UP 11
4. Hotel applicants/developers should demonstrate how they will pursue mass transport activities that reduce traffic congestion such as shuttle services, linkages with other hotels, use of the trolley or like public transit options, for guest and employees, particularly for group-oriented hotels.
Guests of the resort would use personal vehicles that would be valet parked upon arrival. Although guests are not forbidden from using their vehicles, the hotel is within walking distance of the City’s main tourist attractions and the locations of its most popular events, including the Napa Valley Wine Train depot, Oxbow Public Market, CIA at Copia, and the fairgrounds that host the Bottle Rock Music Festival. The hotel will also be close to public transit. The Applicant is not a hotel operator, so operations like arranging group tours would be up to the hotel operator once one is selected.
5. Hotel applicants/developers should demonstrate how they will link with the Napa Valley College Hospitality Institute and Hospitality and Tourism Management Program, and/or provide in-house hospitality and employment training programs that will provide a career ladder and stable employment sector.
The Applicant’s economic impact statement includes a list of workers that would be needed to operate a hotel complex of the proposed size and the estimated wages that they will be paid. These positions range from $17/hr to $120,000/yr. It will be up to the hotel operator to decide whether to train people on the job and promote employees to more responsible positions, creating a career ladder within the company, or to hire high- wage employees from outside.
6. Hotel projects should demonstrate how they will meet sustainability (green) practices as determined by LEED standards or future green ordinances or initiatives that may be adopted by the City.
The Project would meet or exceed California’s stringent building code. The site is located in a walkable area in downtown Napa and is near tourist attractions. It will meet all standards for storm water management, low-flow plumbing fixtures, efficient lighting, and high efficiency mechanical systems.
7. Hotel applications should demonstrate as part of the application process a commitment to advancing cultural arts by providing a public art component visible and accessible to the public, particularly for hotels located downtown.
Hotel projects in the pipel ine may be subject to a future "art in public places'' ordinance, pending adoption by City Council in 2008.
The Applicant has communicated interest in installing a public art feature, but it has not yet been identified at this stage; however, the Applicant has identified that it would no longer pursue construction and placement of the “arrow” art contemplated in the original Project approval. Refer to Section IV.I. above.
ATTACHMENT 15
PL22-0137 – First & Oxbow Hotel DR & UP 12
8. Hotel applicants should provide a report or study that provides a comprehensive overview regarding hotel employment. The report or study should be prepared by an independent consultant and include, at a minimum, the following information: the number of employees the hotel would employ, full-time vs. part- time, position titles, wage rates by position, and types of benefits; the anticipated breakdown of employees residing inside or outside the County of Napa, and the rationale for breakdown; and any programs or policies the Applicant or operator will implement in the area of employee housing and congestion management.
The City Council has requested this employment information to measure any economic, housing and transportation impacts the hotel would create.
The Applicant submitted Attachment 9, Economic Impact Analysis, and the following data below:
Annual Economic Impact at Hotel Oxbow Stabilization
- 12% TOT = $1,831,716
- 2% Tourism = $305,286
- 1% Affordable Housing = $152,643
Hotel Oxbow Team Members
- Executive & Management - Base annual salary range of $48,000 to $120,000 - Sales & Marketing - Salary range of $52,000 to $82,000 - Engineers - Salary range of $25 to $33 per hour
- Front Desk Attendants - Salary range of $17 to $21 per hour - House Keeping & Laundry Staff - Salary range of $17 to $21 per hour - Tipped valet & Bell Staff - Salary range of $17 to $21 per hour
Hotel Oxbow Restaurant and Bar Team Members
- Management - Salary range of $48,000 to $95,000
- Cooks and Prep Staff - Salary range of $17 to $28 per hour - Tipped Staff - Salary range of $17 to 21 per hour
Misc.
- Estimated construction income to local North Bay and Bay Area contractors - $40,500,000
- Project construction will generate approximately 275 individual local area jobs and tax revenue during the 22-months of construction activity. - Project operations after opening will generate approximately 32 full-time local individual jobs with a 1.10 multiplier for supporting services.
ATTACHMENT 15
PL22-0137 – First & Oxbow Hotel DR & UP 13
VII. ENVIRONMENTAL REVIEW
Staff recommends that the Planning Commission recommend that the City Council determine that the Project falls within the scope of the Downtown Napa Specific Plan Program (DNSP) Final Environmental Impact Report ( DNSP FEIR) certified by the City Council on May 1, 2012 (SCH #2010042043), as documented in the 2020 Addendum prepared for the original project and the January 2024 Addendum prepared for the revised project and on file with the City Clerk, and no further environmental review is required under the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Sections 15162, 15164 and 15168 as documented in the CEQA Memorandum prepared for the project included as Attachment 10.
VIII. REQUIRED FINDINGS
A. Design Review
Approval of the Project is subject to the required findings in NMC Section 17.62.080 relating to Design Review Permits. These findings are provided below and relate to consistency of the project with the General Plan, Zoning Ordinance, and applicable Guidelines.
Staff determined that the proposed Project would comply with these findings, subject to the conditions of approval provided in Attachment 1.
1. The project design is in accord with the General Plan and any applicable specific plan design policies.
The proposed Project, associated improvements, and tourist -oriented use as amended are consistent with the Oxbow Commercial General Plan designation under the Napa 2040 General Plan, which defers to the DNSP Downtown II Building Form Overlay. The DNSP allows for a maximum FAR of 4. 0 and this Project provides a FAR of approximately 3.90 which is below the DNSP maximum FAR. Likewise, the Project meets the DNSP Design Guidelines in that it employs four -sided architecture and includes measures to create an active pedestrian street frontage. Accordingly, the Project aligns with the design policies set forth in the General Plan and DNSP.
2. The project design is consistent with applicable design review guidelines adopted by the City Council.
The Project is subject to the DNSP Design Guidelines. The proposed Project’s design, site layout and architecture are consistent with the goals, policies and recommendations outlined in the Design Guidelines. The Project design employs four- sided architecture and employs thoughtful landscaping and sustainability measures.
The design will exhibit a contemporary interpretation of the traditional "small block, small lot" development pattern in Downtown Napa. The new building would employ articulation in walls and roofing while using a contemporary style with natural materials that would provide variety in First Street architecture. The design elements meet the DNSP Design Guidelines.
ATTACHMENT 15
PL22-0137 – First & Oxbow Hotel DR & UP 14
3. The design review permit is in accord with provisions of this title and will not be detrimental or injurious to property or improvements in the vicinity of the development site, or to the public health, safety or general welfare.
The Design Review permit is consistent with NMC Title 17 (Zoning Ordinance), and the development standards of the DNSP "Downtown II" District. As conditioned, the proposed Project would not result in any significant impacts. The hotel and its tourist- oriented uses have been appropriately conditioned to minimize any potential impacts to the surrounding neighborhood and therefore would not result in adverse impacts to adjacent properties or to the general health, safety, and welfare of the community.
B. Use Permit
The City Council ’s approval of this project is subject to the required findings in NMC Section 17.60.070 relating to Use Permits. These findings are provided below and relate to consistency of the project with the General Plan, Zoning Ordinance, and applicable Guidelines.
Staff determined that the proposed Project would comply with these findings, subject to the conditions of approval provided in Attachment 1.
1. The proposed use in accord with the General Plan, applicable specific plans, the objectives of the zoning ordinance and the purposes of the district and overlay district in which the site is located.
The Project would align with the goals of the Oxbow Commercial (OBC) land use designation of the Napa 2040 General Plan as well as the goals and standards of the Downtown Napa Specific Plan (DNSP). In particular, the hotel makes efficient use of the underutilized site between the central part of First Street and the Oxbow Public Market. It proposes lodging facilities at a conveniently accessed site and would continue development of the pedestrian/bike trail network along the Napa River by connecting First Street down to Water Street, which would allow for the future buildout of a river adjacent trail and future pedestrian br idge. This would be consistent with Policies LUCD 13-1, 18-6, and ED 6-1.
The Project would further be consistent with the DNSP in that the proposed design would feature a human - scale, pedestrian - friendly environment that is inviting to residents and visitors . The Project would place priority on high - quality design and developing unique structures that complement their surroundings, orienting buildings and entrances to streets and public gathering places. The design of the new building would be complementary to the existing mix of buildings in the DNSP area, being a tall, contemporary building with an active street front like other new downtown Napa hotels built on First Street next to prewar commercial buildings. The design would meet th e Guidelines of the DNSP and would meet the development standards prescribed by the "Downtown II" Building Form Overlay. Accordingly, the Project is found to further the objectives and policies of the General Plan and would not inhibit attainment of any goals or objectives outlined in the General Plan or the DNSP.
ATTACHMENT 15
PL22-0137 – First & Oxbow Hotel DR & UP 15
2. The proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity, or to the general welfare of the city.
The Project application has been circulated to relevant departments and agencies and their comments and special conditions have been incorporated to ensure the Project will not pose a nuisance to the community. The Public Works Department has determined that the improvements have been designed consistent with both the existing City Floodplain Management regulations and standards, and with Federal floodplain criteria. The proposed access points have been reviewed, modified, and designed to minimize traffic conflicts, thereby rendering safe vehicular and pedestrian movements. Historically, portions of the Site had been occupied by various uses including a foundry, machine shop and a dry-cleaning business. Although subsurface investigations conducted with the Phase 1 ESA determined lead levels below the commercial/ industrial land use ESL thresholds, the Project has been conditioned to prepare a Soils Management Plan, Health and Safety Plan and a Human Health Risk Assessment Plan to Construction Workers to ensure contaminants of concern do not pose human health risks to future construction and utility workers and the public. As conditioned, the Project will not cause negative impacts to the neighborhood nor result in impacts that would be detrimental to the public health, safety, or welfare. Hospitality and visitor accommodation uses already function proximate to the Site.
3. The proposed use complies with each of the applicable provisions of the zoning ordinance.
Hotels may be established by a Use Permit in the OBC Zoning District. The proposed hotel has been reviewed for compliance with the DNSP "Downtown II" development standards and has been found to be compliant with these standards. With City Council approval of a Use Permit as conditioned, the proposed use w ould be in compliance with the provisions of Chapters 17.10 and 17.60 of the Zoning Ordinance.
4. The proposed use complies with any other applicable findings required under other chapters of this title for the specific use.
There are no other applicable findings required under other chapters of this title for the proposed use.
IX. PUBLIC NOTICE
Notice that this application was received was provided by the City on March 2, 2023, and notice of the scheduled public hearing was provided on January 19, 2024, by US Postal Service to all property owners within a 500-foot radius of the subject property. Notice of the public hearing was also published in the N apa Valley Register on January 20, 2024, and provided to people previously requesting notice on the matter at the same time notice was provided to the newspaper for publication. The Applicant was also provided a copy of this Report and the associated attachments in advance of the public hearing on t he project.
ATTACHMENT 15
PL22-0137 – First & Oxbow Hotel DR & UP 16
X. PUBLIC COMMENT
As of this writing, no public comments have been received.
ATTACHMENT 15
M E M O
TO: CHAIR SHOTWELL, MEMBERS OF THE PLANNING COMMISSION FROM: RYDER DILLEY, ASSOCIATE PLANNER
DATE: JANUARY 31, 2024
SUBJECT: FIRST & OXBOW HOTEL (Project No. PL22-0137)
Following the publication of the February 1, 2024, Planning Commission agenda, additional correspondence was received for consideration for the First & Oxbow Hotel project (PL22 -0137) identified as Public Hearing Item 7.A.
The correspondence includes letters and correspondence from the following, which are attached to this memorandum.
• Jamboree Housing (01-30-24)
• Diana and Joe Wilcox (01-31-24)
• Cass Walker (01-31-24)
• Chuck and Felicia Shinnamon, John and Dorothy Salmon, Cass Walker (01-31-24) • Alan Charles Dell’Ario (01-31-24)
• Janet Fletcher (01-31-24)
• Katie Shaffer (Feast it Forward) (01-31-24)
• Carlotta Sainato (Napa County Bicycle Coalition) (01-30-24) • Howard Siegel (01-31-24)
• Carol Barge (01-31-24)
ATTACHMENT 15
January 31, 2024
Dear Planning Commissioners:
Mr. Gordon Huether, Mr. Paul Kelley, Mr. Bob Massaro,
Mr. Alexander Myers, Ms. Beverly Shotwell
I am wriIng in opposiIon to the First & Oxbow Hotel Design Review and Use Permit. These talking points were draRed and distributed by Chuck Shinnamon and others in our community. I am in complete agreement with them.
As Chuck’s (et al) leWer states:
“Why hasn’t an overall plan for the Oxbow been developed for public review, discussion, and approval? Why is the City approving projects in a piecemeal fashion rather than in a cohesive manner? With the current parking challenges in the Oxbow, all of these new uses are going to overwhelm the area. Why hasn’t a cohesive parking plan been created?
What about issues of car and tour bus traffic especially on First Street and Silverado Trail; water supply; River issues; drainage and flooding; visual issues related to these very tall buildings?” Listed below are the many reasons why this project should not move forward unIl more analysis of this parIcular project is completed along with a comprehensive specific plan for the Oxbow District. A myriad of projects are slated for the Oxbow that could total as many as 1100 hotel rooms.
As Chuck Shinnamon (et al) stated:
“1. We urge you to take the General Plan off the shelf. • General Plan Oxbow Commercial land use designaIon: "There is a remaining need for the City to specifically address the unique challenges and opportuniIes within the Oxbow District as part of a focus area plan or a specific plan." The General Plan is calling for a "big picture" analysis of the Oxbow District rather than one project approval at a Ime.
• LUCD 22-1: Update the Downtown Napa Specific Plan to recognize the Oxbow District as its own unique part of downtown. This should be done before this project is considered. • LUCD 22-2: Determine and plan for an appropriate number of hotels or hotel rooms in Downtown. Use that informaIon to update or amend the Downtown Napa Specific Plan. This should be done before this project is considered. [This 2022 Statement of General Plan Policy overrides the Hotel Policies adopted in 2008 that are referenced in the Staff report].
Don’t turn your back on the General Plan.
2. CEQA requires an updated analysis on GHG impacts and transportaIon/transit impacts because there is "new informaIon" and "changed circumstances" (the CEQA standards for when new analysis is required):
• New informaIon: The 2024 Addendum recommends the same GHG ReducIon Plan as was recommended in 2020 even though this project produces more GHG; and even though the Bay Area Air ATTACHMENT 15
Quality Management District adopted a 2022 GHG threshold which replaces the threshold under which the 2020 project was analyzed. GHG impacts are "significant and unavoidable" according to the DNSP EIR. That means they could not be miIgated.
• Changed circumstances: Since the DNSP EIR and the 2020 Addendum were approved, the state law changed to require an analysis of VMT, rather than level of service (LOS) to determine transportaIon impacts. This change of circumstances requires a full VMT analysis (which has never been done).
GHG impacts and transportaIon impacts were idenIfied as "significant and unavoidable" in the DNSP EIR. That means they could not be miIgated. Therefore it's parIcularly important that the new project not make things even worse.
3. The developer's very limited analysis regarding hotel employment does not comply with the City's Hotel Policy which requires a "comprehensive overview" prepared by an "independent consultant." The analysis suggests that salary levels will fall into low-moderate income range. Where is the affordable housing in Napa where these employees will live? And if they don't live in Napa, then where will they commute from? [A quesIon that a complete VMT analysis will answer]. “
Respecrully,
Carol Barge
Napa
ATTACHMENT 15
1 Mayra Espinoza
From: Alan Charles Dell'Ario
Sent: Wednesday, January 31, 2024 12:39 PM
To: Mayra Espinoza
Cc: Mary Luros; Beth Painter; Scott Sedgley
Subject: Oxbow development - planning commission agenda item 7A February 1, 2024 [EXTERNAL]
Ms. Espinoza:
I write in opposition to the hotel development proposed for the Oxbow site in agenda item 7A. The additional hotel rooms are not justifiable and the project itself threatens to overwhelm the Oxbow district. I agree with the objectors who feel that the Oxbow projects must be considered in the aggregate, and not piecemeal as is being done. This project and the others proposed for the Oxbow add to the mounting threat that Napa will become nothing but a tourist and second-home playground. Already the lack of services downtown such as a grocery market have damaged the quality of life for the residents.
Additionally, the CEQA analysis by staff is erroneous and inadequate, to wit:
A 12-year-old EIR cannot serve to properly address the changes that have occurred in Napa as pertain to the Oxbow District and that will be impacted by the project.
— The addenda that were prepared for the project do not cure the inadequacies and the conditions specified in section 15162 do not exist. A new Initial Study is required within the meaning of Section 15064.
At best the 2012 Napa Specific Plan EIR referenced in the agenda and proposed resolution is a project EIR. A recent appellate decision from San Diego explains:
[I]f a later proposal is not ‘either the same as or within the scope of the project ... described in the program EIR,’ then review of the proposal is not governed by section 21166's deferential substantial evidence standard. (Sierra Club, supra, 6 Cal.App.4th at p. 1321, 8 Cal.Rptr.2d 473, citing CEQA Guidelines, § 15168, subd. (c)(5).) Instead, under ... section 21094, the agency is required to apply a more exacting standard to determine whether the later project might cause significant environmental effects that were not fully examined in the initial program EIR.”
Save Our Access v. City of San Diego (2023) 92 Cal.App.5th 819, 845
— The cumulative impact of the project, in conjunction with other projects in planning or approved, on the Oxbow district, and the community as a whole is not properly addressed within the meaning of the guidelines. Sec. 15064 (f)(7)
— The traffic impact of the project is not properly addressed, particularly in light of SB 743 and Sec. 15064.3.
— Greenhouse gas emissions are not adequately addressed. Sec. 156064.4.
There may be other errors/omissions in the EIR and the addenda.
This project is oversized for the area and threatens quality of life for the people that live here.
~A. Charles Dell'Ario
Some people who received this message don't often get email from [email protected]. Learn why this is important ATTACHMENT 15
2 Alan Charles Dell’Ario
2019 California Lawyer Attorney of the Year
Certified Specialist, Appellate Law
State Bar of California Board of Legal Specialization
Napa, California 94559
ATTACHMENT 15
1 Mayra Espinoza
From: Janet Fletcher
Sent: Wednesday, January 31, 2024 1:44 PM
To: Mayra Espinoza
Subject: First and Oxbow hotel proposal
[EXTERNAL]
Hello,
In advance of tomorrow’s Planning Commission meeting, which I cannot attend, I am writing to express my opposition to the approval of the First and Oxbow Hotel unless and until the City of Napa prepares a master plan for the Oxbow District. All development in that area should be subject to a master plan that addresses environmental impact, traffic and parking considerations, pedestian impact and the overall character of downtown Napa. Projects should not be approved piecemeal, as appears to be the case with the proposed First and Oxbow Hotel.
Thank you,
Janet Fletcher
Napa
You don't often get email from Learn why this is important ATTACHMENT 15
January 29, 2024
Ryder Dilley
Senior P
lanner
City of Napa
Se nt via email
Subject: J
amboree Housing Corporation’s Affordable Housing Project 515 Silverado Trail, Napa
Dear M
r. Dilley,
We have been asked to provide additional background information on how Jamboree Housing
Corporation “Jamboree” came to propose and entitle the affordable housing development at 515 Silverado Trail (“Silverado Trail”) in Napa.
David Wood ,
Jamboree’s Board Chairman and 20+ year Board Member, presented the Silverado Trail development site to Jamboree in June 2022. He provided property information and an introduction to the property owner . Jamboree, with guidance from David , negotiated a letter of intent and purchase agreement with the owner. Escrow opened in January 2023.
Working with M
olly Rattigan at the City, the project is now entitled for 40 one -bedroom units with resident services, plus a manager’s unit. With the City’s collaboration and assistance Silverado Trail was entitled utilizing AB2162.
Silverado Trail is
a smaller development for Jamboree, but based on David’s introduction to City Staff and the warm reception received we determined this was an appropriate opportunity to pursue. We foresee this as the beginning of a long-term relationship with the City similar to other cities where Jamboree has developed 5 or more communities.
It is our un
derstanding David’s company, Stratus Development Partners, still plans to pay the housing in- lieu fee (estimated at $723,000) to the City as part of its hotel modification application.
In summary, due
to David’s efforts, introductions, relationships, and guidance, we would not have known about Silverado Trail and the entitlements and financing would not have occurred.
Sincerely,
Jamboree Hou
sing Corporation
Roger Kino shita
Vice P resident, Acquisitions
ATTACHMENT 15
1 Ryder Dilley
From: Carlotta Sainato
Sent: Tuesday, January 30, 2024 4:05 PM
To: Lorien E. Clark
Cc: Kara Vernor; Ryder Dilley;
Subject: Questions about First & Oxbow Hotel Project
[EXTERNAL]
Hi Lorien,
Hope you're doing well! We have a few clarifying questions about the First & Oxbow Hotel project that's coming to the Planning Commission this Thursday that I was hoping you could help with.
Ryder confirmed with me that Class II bike lanes will be installed on First Street as part of this development, which is great to hear! A few follow-up questions on that:
Do you know if the bike lanes will be from Soscol to McKinstry Street only, or will they extend further east to connect to the existing bike lanes around Vernon Street? Will conflict markings be included at conflict points like the driveways/the valet drop-off area? The cross-section included in the plans attachment shows the bike lanes to be 8 feet wide - is there currently any plan of making those bike lanes buffered? We love to see the extra space, and understand that using some of the space to include the painted buffer will reduce the likelihood of motorists confusing it for a parking lane or pulling over in the bike lane "for just a minute," as well as improve bicyclist comfort.
Separately, will there be any improvements to the First/Soscol intersection for bicyclists or pedestrians to improve access to the Vine Trail and downtown? And can you confirm the amount, location and type (long-term vs. short-term) of bike parking that is planned on being provided?
I know these are a lot of questions and some may be a bit early in the process, but we'd greatly appreciate any clarification you can provide. Thank you!
--
Carlotta Sainato (she/her)
Program Manager, Napa County Bicycle Coalition
www.napabike.org