Cities Index.
ATCH 3 - Summary of Revisions

Napa City Council
May 21, 2024

Document
ATCH 3 - Summary of Revisions
Meeting
May 21, 2024
Body
Napa City Council
Pages
1
Original file
107 KB
Text extracted from the city's file for reading and search. Open the original on napacity.legistar1.com. That file is the official record.

Summary of

Revisions

f
or

the

Neighborhood Traffic Calming Program (
NTCP
)

Guidelines and Procedures

The Draft NTCP Guidelines and Procedures

document was available for community review from
October 11, 2023, to December 15, 2023.

Public Works staff reviewed all comments
received on
the Draft
NTCP Guidelines and Proc
edures document and
incorporate
d

relevant comments into
the final version. Below is a
summary of
the

revisions

that were

incorporated

into the final

document
.

NTCP
Document Section

Revisions to NTCP

Section 1.1: Background

Provide
d

additional narrative
regarding
the
use

of the NTCP Guidelines and Procedures
document, and
how the NTCP
compliments
other adopted City Plans
.

Section 2.6: Prioritization and Funding,

Table 1.
–

Scoring Criteria for Traffic Calming
Considerations

Revise
d

the scoring criteria to include
“Equity” and “Included in
a
no
ther planning
document” as additional scoring criteria.

Section 3.4 Traffic Calming Toolbox,

Table 2.

–

List of
Traffic Calming Measures

•

Add
ed

“Go Safely

California

Program
”

as
an education Traffic Calming Measure in
Tier I.

•

Add
ed

“
Safe Routes to School Program
”

as an education

Traffic Calming Measure
in Tier I/II.

•

Ad
d
ed

“
Lane Narrowing
”
as a
n
engineering

Traffic Calming Measure

in
Tier I.

•

R
evise
d

“Quick Build

Projects
”

and “Pilot
Project
s
” into separate
engineering
Traffic
Calming Measures
.

Place
d

“Quick Build

Projects” in Tier II and “Pilot Projects” into
Tier II/IIb

Appendix
A

–

City of Napa
Neighborhood

Traffic Calming Program Toolbox

•

Revise
d

the
“Benefits”,

“
Disa
dvantages”
and “Impl
e
mentation”
for the T
raffic
Calming Measures
in the Toolbox to
better
account for

multimodal user
s
.

•

Revise
d

the “Cost” listed for the Traffic
Calming Measures in the Toolbox to be
included as a cost range reflective of
recent local construction costs.

•

Revised

the Toolbox c
onsistent with
the

changes to Section 3.4, Table 2 (listed
above)

to add/revise certain
Traffic
Calming Measures
.

Appendix B
–

Petition Form
,

Application for Evaluation
–

Neighborhood
Support Section

Revise
d

narrative
for clari
ty regarding
signat
ures;

R
eference
d

collecting signatures
from
“
resident
s” rather than “properties”.

Appendix
D
–

Community Input Summary

Provide
d

additional narrative outlining

the

community outreach efforts

conducted

throughout the
p
rogram development.

ATTACHMENT 3

Page 1 of 1 ends
← All documents from this meeting