Cities Index.
ATCH 5 - Project Plans

Napa City Council
May 21, 2024

Document
ATCH 5 - Project Plans
Meeting
May 21, 2024
Body
Napa City Council
Pages
12
Original file
16.9 MB
Text extracted from the city's file for reading and search. Open the original on napacity.legistar1.com. That file is the official record.

PROPOSED CHANGE OF USE:

EXISTING USE: PUBLIC USE - RELIGIOUS BUILDING
PROPOSED USE: DAY CARE FACILITY (15+ CHILDREN) (TABLE 17.08.20) THE PROJECT WILL BE A TENANT IMPROVEMENT.

RECONFIGURING THE FLOOR PLAN TO CREATE NEW CLASSROOMS, ADDING AN ELEVATOR FOR ACCESSIBILITY COMPLIANCE, NEW TODDLER AND INFANT RESTROOMS.

MINOR EXTERIOR CHANGES RELATED TO NEW ELEVATOR, REMOVAL OF STE EPLE,

ADDED SHADE STRUCTURES, COVERED WALKWAYS, AND PLAYGROUND LIGHTI NG.

ALL OTHER EXTERIOR ELEMENTS ARE EXISTING TO REMAIN.

NO CHANGES TO THE EXTERIOR BUILDING COLORS.

NO CHANGES TO THE EXISTING LANDSCAPE.

NO CHANGES TO THE EXISTING PARKING LOT.

A NEW 6 FOOT WROUGHT IRON FENCE WILL ENCLOSE THE ENTIRE FACILITY, WITH 3 PEDESTRIAN GATES PROVIDING SECURED ACCESS.

ADDRESS: 15 CHAPEL HILL DR
LOT APN: 006162001000
SIZE: 114,720 S.F.

EXISTING AREAS: (NO CHANGE IN AREAS)
BASEMENT: 2,093
1ST FLOOR: 13,667
2ND FLOOR: 3,985
ZONE: RS 10
BUILDING HEIGHT (TABLE 17.08.030):

ALLOWED:

EXISTING:

STORIES: 2.5
STORIES: 2
HEIGHT: 30 FEET
HEIGHT: 27'-3"
PROPOSED: NO CHANGE IN EXISTING HEIGHT
SETBACKS (TABLE 17.08.030):

REQUIRED:

PROVIDED: SEE A-01
FRONT:20
SIDE:20
SITE

EXISTING

DRIVEWAY

EXISTING

DRIVEWAY
EXISTING 2 STORY

BUILDING

EXISTING

PARKING LOT

EXISTING

PARKING LOT

EXISTING

DRIVEWAY

EXISTING

DRIVEWAY

MONTECITO BLVD

CHAPEL HILL DR

CHAPEL HILL DR

PROPERTY OWNER
:

THE CHURCH OF JESUS CHRIST OF LATTER DAY SAINTS

A UTAH CORPORATION SOLE FKA CORPORATION OF THE PRESIDING BISHOP OF THE CHURCH OF JESUS CHRIST OF LATER-DAY SAINTS, A UTAH CORPORATION SOLE.

REAL ESTATE SERVICES DIVISION
50 EAST NORTH TEMPLE STREET 12TH FLOOR
SALT LAKE CITY, UTAH 84150
P: 801.353.1268
DESIGN-BUILDER:

HAGGERTY CONSTRUCTION

DAVID CUPPET
2474 WIGWAM DRIVE
STOCKTON, CA 95205
T: 209.475.9898
P: 209.888.9029

OWNER REPRESENTATIVE
:

BURTON REAL ESTATE SERVICES

NICK BURTON
14670 CANTOVA WAY SUITE 204
RANCHO MURIETA, CA 95683
T: 916.303.6425

VICINITY MAP
As Noted
Scale:

Date:

Job #
These drawings and specifications are the
property and copyright of Haggerty
Construction and shall not be used or
duplicated in part or in whole on any other
work except by agreement with Haggerty
Construction.
2/27/2024 10:49:25 AM
A-00
Cover Sheet
15 CHAPEL HILL DRIVE
NAPA CA 94559
23063
01/15/2024
Child Develpment Center

CHILD DEVELOPMENT CENTER

PROJECT DESCRIPTION

PROJECT ZONING INFORMATION

CHANGE OF USE

AREAL VIEW
_SHEET INDEX
Sheet Number
Sheet Name
02/07/2024-CHANGE OF US
E
-
-
-
A-00
Cover Sheet
●
A-01
Existing Site Plan
●
A-02
Conceptual Site Plan
●
A-03
Site Plan
●
A-04
Existing Floor Plan
●
A-05
Proposed 1st Floor Plan
●
A-06
Basement & 2nd Floor Plans
●
A-07
Exterior Elevations
●
A-08
Exterior Elevations
●
A-09 Exterior Elevations ●
A-10
Proposed Play Area
●
A-11
Proposed Shade Sail and Covered Walkway Areas
●
_PROJECT TEAM
15 CHAPEL HILL DR. NAPA CA 94559
Parking Calculations
Revision Schedule
#
Date
Description
A
02/26/2024
Preliminary
Planning
Comments
TABLE 17.15.54.040
DAY CARE:

REQUIRED:
1 PER EMPLOYEE
1 PER 12 CHILDREN.

EMPLOYEES: 55
CHILDREN:
2 50
/ 12 =
21 TOTAL REQUIRED:
76 TOTAL PROVIDED:

9 7
PARKING SPACE:

9 3
ACCESSIBLE PARKING: 4
ATTACHMENT 5

Page 1 of 12 ends

EXISTING BUILDING

39.00'

EXISTING BUILDING

23.00'

EXISTING PAINTED

BLUE STRIPING AT

REFUGE AREA

FRONT SETBACK

20.00'

SIDE SETBACK

20.00'

20.00'
EXISTING BLDG.

16.71'
TYP.
9' - 0"
19' - 0"

1. 2.

NO CHANGE TO EXISTING PARKING LOT.

NO CHANCE TO EXISTING LANDSCAPE
As Noted
Scale:

Date:

Job #
These drawings and specifications are the
property and copyright of Haggerty
Construction and shall not be used or
duplicated in part or in whole on any other
work except by agreement with Haggerty
Construction.
2/27/2024 10:49:27 AM
A-01
Existing Site Plan
15 CHAPEL HILL DRIVE
NAPA CA 94559
23063
01/15/2024
Child Develpment Center
1" = 20'-0"
1 EXISTING SITE PLAN

SITE PLAN NOTES
Revision Schedule
#
Date
Description
ATTACHMENT 5

Page 2 of 12 ends

NEW WROUGHT IRON 6'

FENCE SURROUNDING

ENTIRE FACILITY (TYP)
NEW WROUGHT IRON 6'

FENCE SURROUNDING

ENTIRE FACILITY (TYP)

NEW WROUGHT

IRON VEHICLE GATE

NEW WROUGHT

IRON PEDESTRIANS
GATE

NEW WROUGHT IRON

PEDESTRIANS GATE

TO SERVE AS MAIN

DROP OFF AREA
NEW WROUGHT IRON 6'

FENCE SURROUNDING

ENTIRE FACILITY (TYP)

EXISTING BUILDING

NEW WROUGHT

IRON PEDESTRIANS
GATE
MONTECITO BLVD.

BONITAS AVE.

CHAPEL HILL DR.

CHAPEL HILL DR.

EXISTING PARKING LOT

EXISTING PARKING LOT
NEW 3' WHITE

PICKET FENCE
NEW 3' WHITE

PICKET FENCE
NEW 3' WHITE

PICKET FENCE

EXISTING PARKING LOT

W/ ACCESSIBLE

PARKING STALLS

EXISTING LAWN TO

BECOME PLAY AREA

EXISTING LAWN TO

BECOME PLAY AREA

EXISTING LAWN TO

BECOME PLAY AREA
NEW 3' WHITE

PICKET FENCE

EXISTING

LAWN TO
BECOME

PLAY AREA

EXISTING LAWN

TO BECOME

PLAY AREA

WITH PLAY

STRUCTURE
SEE SHEET A09
NEW WROUGHT IRON 6'

FENCE ON TOP OF

EXISTING CMU WALL

AREA TO
BECOME

CHILDRENS
GARDEN

PLAY AREA

EXISTING DRIVEWAY

EXISTING DRIVEWAY
NEW WROUGHT IRON 6'

FENCE SURROUNDING

ENTIRE FACILITY (TYP)

NEW WROUGHT
IRON 6' FENCE

SURROUNDING

ENTIRE FACILITY
(TYP)

DROP OFF
ENTRY

EXISTING

LANDSCAPE AREA

EXISTING

LANDSCAPE AREA

EXISTING TOOL

SHED TO REMAIN

EXISTING MAINTENANCE

BUILDING

EXISTING

LANDSCAPE AREA

EXISTING DRIVEWAY
SHADE

STRUCTURES
SEE A-11
SHADE

STRUCTURES
SEE A-11
SHADE

STRUCTURES
SEE A-11
SHADE

STRUCTURES
SEE A-11
SHADE

STRUCTURES
SEE A-11
36"
3"
1/
3 1/2"
2 "
As Noted
Scale:

Date:

Job #
These drawings and specifications are the
property and copyright of Haggerty
Construction and shall not be used or
duplicated in part or in whole on any other
work except by agreement with Haggerty
Construction.
2/27/2024 10:49:30 AM
A-02
Conceptual Site Plan
15 CHAPEL HILL DRIVE
NAPA CA 94559
23063
01/15/2024
Child Develpment Center
1" = 20'-0"
3 CONCEPTUAL SITE PLAN
Wrought Iron Fence
Woden White Picket Fence
Parking Calculations
2 9
9 14
13 11
14 11
Revision Schedule
# Date Description
A 02/26/2024 Preliminary
Planning
Comments
1 0
TABLE 17.15.54.040
DAY CARE:

REQUIRED:
1 PER EMPLOYEE
1 PER 12 CHILDREN.

EMPLOYEES: 55
CHILDREN:
250
/ 12 =
21 TOTAL REQUIRED:
7 6
TOTAL PROVIDED:

9 7
PARKING SPACE:

9 3
ACCESSIBLE PARKING: 4
ATTACHMENT 5

Page 3 of 12 ends

Napa Fire eNGINE
MONTECITO BLVD.

CHAPEL HILL DR.

CHAPEL HILL DR.

EXISTING BUILDING
TYP.
19' - 0"
TYP.
9' - 0"

EXISTING SIDEWALK

NEW WROUGHT

IRON PEDESTRIANS
GATE

NEW WROUGHT IRON

PEDESTRIANS GATE TO

SERVE AS MAIN ENTRY /

DROP OFF AREA

NEW WROUGHT

IRON PEDESTRIANS
GATE
NEW WROUGHT IRON 6'

FENCE SURROUNDING

ENTIRE FACILITY (TYP)
NEW WROUGHT IRON 6'

FENCE SURROUNDING

ENTIRE FACILITY (TYP)
NEW WROUGHT IRON 6'

FENCE SURROUNDING

ENTIRE FACILITY (TYP)
NEW WROUGHT IRON 6'

FENCE SURROUNDING

ENTIRE FACILITY (TYP)

EXISTING SIDEWALK

EXISTING

SIDEWALK

ACCESSIBLE PATH

ACCESSIBLE PATH

EXISTING SIDEWALK

EXISTING SIDEWALK

EXISTING LAWN TO

BECOME PLAY AREA

EXISTING LAWN TO

BECOME PLAY AREA
NEW 3' WHITE

PICKET FENCE (TYP)

EXISTING LAWN TO

BECOME PLAY AREA

EXISTING LAWN

TO BECOME PLAY

AREA WITH PLAY

STRUCTURE
SEE SHEET A09

EXISTING

LAWN TO
BECOME

PLAY AREA

AREA TO
BECOME

CHILDREN
GARDEN

PLAT AREA

EXISTING PARKING

W/ ACCESSIBLE

PARKING STALLS

EXISTING MAINTENANCE

BUILDING

EXISTING TOOL SHED

PRIMARY

BUILDING

ENTRANCE

EXISTING DRIVEWAY

NEW WROUGH IRON

VEHICLE GATE

EXISTING DRIVEWAY
NEW WROUGHT IRON 6'

FENCE ON TOP OF

EXISTING CMU WALL

NEW LIGHT POLE

NEW LIGHT
POLE

NEW LIGHT
POLE
2 11
9 9
14 13
11 14
4 EXISTING GRASS AREA TO REMAIN

EXISTING PLANTING AREA TO REMAIN

EXISTING BUSHES TO REMAIN

EXISTING TREE TO REMAIN
NEW WROUGHT IRON 6' FENCE
NEW 3' WHITE PICKET FENCE

PROPOSED LOCATION OF SHADE
STRUCTURES. SEE A-11 FOR
ADDITIONAL INFORMATION.

NEW LED LIGHT POLE TO MATCH
EXISTING. PLACED IN PLAY AREA.

TYP OF 3

1. 2.

NO CHANGE TO EXISTING PARKING LOT.

NO CHANCE TO EXISTING LANDSCAPE
As Noted
Scale:

Date:

Job #
These drawings and specifications are the
property and copyright of Haggerty
Construction and shall not be used or
duplicated in part or in whole on any other
work except by agreement with Haggerty
Construction.
2/27/2024 10:49:50 AM
A-03
Site Plan
15 CHAPEL HILL DRIVE
NAPA CA 94559
23063
01/15/2024
Child Develpment Center
1" = 20'-0"
1 Site Plan

LANDSCAPE LEGEND

SITE PLAN NOTES
Revision Schedule
# Date Description
A 02/26/2024 Preliminary
Planning
Comments
1 0
Proposed fencing shall not exceed 6 feet in
height unless an administrative permit has
been obtained, pursuant to NMC 17.54
ATTACHMENT 5

Page 4 of 12 ends

UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
1 2
3 4
5 5.2
6 1.5
460 SF
Ex Foyer
114 SF

EX CORR.
78 SF

EX CLERK
184 SF
EX. BISHOP
CL
CL
496 SF
Room
22 SF
ES. ST
767 SF

EX Platform
CL
378 SF
Ex. Serving Area
3,567 SF
Ex. Cultural Hall
606 SF
Ex. Rostrum
1,651 SF
Chapel
247 SF
Ex.Entry
Storage
182 SF
Men's
84 SF
Room
27 SF
Jan
88 SF
Ex. Mothers
210 SF
Women's
87 SF
Office
162 SF
Room
642 SF
Ex. Childrens
Mtg. Rm
Cl.
11 SF
Cl.
330 SF
Ex. Corridor
221 SF
Ex. Corridor
223 SF
Ex. Material
Center
104 SF
Room
96 SF
Room
235 SF
Room
224 SF
Room
A
B
C
D
E
F
G
G.1
H
659 SF
Ex Relief Society
196' - 0"
84' - 10"
Ramp Dn

LINE INDICATES

AREA OF SECOND
FLOOR

LINE INDICATES

AREA OF BASEMENT

PRIMARY

BUILDING

ENTRANCE

NEW PARTIAL HEIGHT PARTITION

EXISTING PARTITION TO BE REMOVED

EXISTING PARTITION TO BE REMAIN

EXISTING DOOR TO REMAIN

NEW DOOR

EXISTING DOOR TO BE REMOVED

NEW FULL HEIGHT PARTITION

1.5 217 SF
Mechanical Rm
131 SF
RR
122 SF
Stairs
48 SF
ST
39 SF
St.
604 SF
Room
65 SF
ST.
95 SF
Storage
311 SF
Storage
C
D
F
H
37 SF
Elec. Rm
86 SF
Hallway
5 5.2
6 2,734 SF
Room
150 SF
Room
197 SF
Room
135 SF
Room
139 SF
Room
385 SF
Room
255 SF
Room
141 SF
Room
138 SF
Room
113 SF
STAIRS
125 SF
CLERK
64 SF
Storage
Furn.
229 SF
Room
235 SF
Room
394 SF
Room
251 SF
Ex. Corridor
407 SF
Ex. Corridor
B
E
G
G.1
As Noted
Scale:

Date:

Job #
These drawings and specifications are the
property and copyright of Haggerty
Construction and shall not be used or
duplicated in part or in whole on any other
work except by agreement with Haggerty
Construction.
2/27/2024 10:49:55 AM
A-04
Existing Floor Plan
15 CHAPEL HILL DRIVE
NAPA CA 94559
23063
01/15/2024
Child Develpment Center
3/32" = 1'-0"
1 1ST FLOOR - EXISTING PLAN

WALL LEGEND
3/32" = 1'-0"
2 BASEMENT FLOOR - EXISTING PLAN
3/32" = 1'-0"
3 2ND FLOOR - EXISTING PLAN
Revision Schedule
# Date Description
ATTACHMENT 5

Page 5 of 12 ends

UP
UP
UP
UP
UP
UP
UP
1 2
3 4
5 5.2
6 1.5
A
B
C
D
E
F
G
G.1
H
A-08
1 A-07
1 A-09
2 A-09
1 670 SF
19 KIDS
Infant
Classroom #05
460 SF
13 KIDS
Todler
Classroom #03
Infants
Playroom
Preschool / TK
Todler
184
Nap Room #02
190
254 SF
Nap Room #01
588 SF
17 KIDS
Infant
Classroom #03
440 SF
13 KIDS
Infant
Classroom #02
463 SF
13 KIDS
Infant
Classroom #01
844 SF
24 KIDS
Todler
Classroom #02
88 SF
Mothers Rm
27 SF
Jan.
3,567 SF
Gymnasium
330 SF
Hallway
248 SF
Entry
59 SF
Infant RR
88 SF
Elev Lobby
221 SF
Hallway
767 SF
Existing
Platform
378 SF
Existing Serving
Area
111 SF
Hallway
9 SF
Cl
11 SF
Cl
60 SF
Elev

MAIN CHILD

DROP OFF
ENTRY
22 SF
Srorage
Ramp Dn
27 SF
Mech
11 SF
El.
831 SF
24 KIDS
Todler
Classroom #01
135 SF
Todler RR
450 SF
13 KIDS
Infant
Classroom #04

LINE INDICATES AREA OF BASEMENT
SEE FLOOR PLAN ON A-06
LINE INDICATES AREA OF 2ND FLOOR
SEE FLOOR PLAN ON A-06
180 SF
Todlers RR
215 SF
Women's
65 SF
Hallway
176 SF
Men's
210 SF
Women's
33 SF
Storage
51 SF
Todler RR
DIAPER

CHANGING

STATION (TYP)

HAND WASHING
SINK. (TYP)
CRIB. (TYP)
78 SF
Office

NEW PARTIAL HEIGHT PARTITION

EXISTING PARTITION TO BE REMOVED

EXISTING PARTITION TO BE REMAIN

EXISTING DOOR TO REMAIN

NEW DOOR

EXISTING DOOR TO BE REMOVED

NEW FULL HEIGHT PARTITION
As Noted
Scale:

Date:

Job #
These drawings and specifications are the
property and copyright of Haggerty
Construction and shall not be used or
duplicated in part or in whole on any other
work except by agreement with Haggerty
Construction.
2/27/2024 10:50:04 AM
A-05
Proposed 1st Floor
Plan
15 CHAPEL HILL DRIVE
NAPA CA 94559
23063
01/15/2024
Child Develpment Center
1/8" = 1'-0"
1 1ST FLOOR - PROPOSED FLOOR PLAN

WALL LEGEND

KEY PLAN
Revision Schedule
# Date Description
A 02/26/2024 Preliminary
Planning
Comments
ATTACHMENT 5

Page 6 of 12 ends

UP
UP
UP
UP

1.5 C
D
F
H
931 SF
27 KIDS
Preschool
Classroom #03
217 SF
Ex. Mech Rm
81 SF
Preschool RR
122 SF
Ex. Stairs
37 SF
Ex Elec Rm
86 SF
Ex. Hallway
95 SF
Ex. Storage
65 SF
Ex. Storage
39 SF
Ex. Storage
48 SF
Ex. Storage
42 SF
Janitor
5 5.2
6 B
E
G
G.1
860 SF
Playroom
Infants
Playroom
Preschool / TK
Todler
650 SF
19 KIDS
Preschool
Classroom #01
640 SF
18 KIDS
Preschool
Classroom #02
467 SF
Office
64 SF
Storage
11 SF
Cl.
251 SF
Ex. Hallway
341 SF
Hallway
113 SF
Stairs
149 SF
Preschool RR
88 SF
Elev Lobby
62 SF
Elev
37 SF
Laundry
125 SF
Break Rm

NEW PARTIAL HEIGHT PARTITION

EXISTING PARTITION TO BE REMOVED

EXISTING PARTITION TO BE REMAIN

EXISTING DOOR TO REMAIN

NEW DOOR

EXISTING DOOR TO BE REMOVED

NEW FULL HEIGHT PARTITION

AREA OF BASEMENT
AREA OF 2ND FLOOR
As Noted
Scale:

Date:

Job #
These drawings and specifications are the
property and copyright of Haggerty
Construction and shall not be used or
duplicated in part or in whole on any other
work except by agreement with Haggerty
Construction.
2/27/2024 10:50:15 AM
A-06
Basement & 2nd
Floor Plans
15 CHAPEL HILL DRIVE
NAPA CA 94559
23063
01/15/2024
Child Develpment Center
1/8" = 1'-0"
2 BASEMENT FLOOR - PROPOSED PLAN
1/8" = 1'-0"
4 2ND FLOOR - PROPOSED PLAN

WALL LEGEND

KEY PLAN
Revision Schedule
# Date Description
ATTACHMENT 5

Page 7 of 12 ends

MAIN FLOOR
0' - 0"

MAIN FLOOR
0' - 0"
T.O. PLATE
22' - 5"
T.O. PLATE
22' - 5"
2nd floor
9' - 6"
2nd floor
9' - 6"
1 2
3 4
5 5.2
6 1.5

NO CHANGE IN BUILDING HEIGHT
EXISTING: 27' - 3"
EXISTING PAINTED BRICK TO REMAIN.

NO CHANGE IN BUILDING COLOR (TYP.)
EXISTING PAINTED BRICK ACCENT TO REMAIN.

NO CHANGE IN BUILDING COLOR (TYP.)

EXISTING STEEPLE

TO BE REMOVED
EXISTING PAINTED STONE FACADE TO REMAIN.

NO CHANGE IN BUILDING COLOR (TYP.)

EXISTING ROOF WITH ASPHALT
COMPOSITION SHINGLES TO REMAIN.

NO CHANGE TO EXISTING ROOF. (TYP)

1. 2.

3. MINOR EXTERIOR CHANGES RELATED TO NEW ELEVATOR, AND REMOVAL OF STEEPLE. ALL OTHER EXTERIOR ELEMENTS ARE EXISTING TO REMAIN.

NO CHANGE IN BUILDING HEIGHT.

NO CHANGE IN BUILDING COLORS.

BENAJAMINE MOORE: HEAVEN #2118-70

MAIN COLOR
BENAJAMINE MOORE: MISTY MEMORIES #2118-60

ACCENT COLOR
As Noted
Scale:

Date:

Job #
These drawings and specifications are the
property and copyright of Haggerty
Construction and shall not be used or
duplicated in part or in whole on any other
work except by agreement with Haggerty
Construction.
2/27/2024 10:50:35 AM
A-07
Exterior Elevations
15 CHAPEL HILL DRIVE
NAPA CA 94559
23063
01/15/2024
Child Develpment Center
1/8" = 1'-0"
1 EXTERIOR WEST ELEVATION
Exterior West Elevation - Image

ELEVATIONS NOTES

ONLY AREA

OF CHANGE

EXTERIOR PAINT COLORS
Revision Schedule
# Date Description
A 02/26/2024 Preliminary
Planning
Comments
ATTACHMENT 5

Page 8 of 12 ends

MAIN FLOOR
0' - 0"

MAIN FLOOR
0' - 0"
T.O. PLATE
22' - 5"
T.O. PLATE
22' - 5"
2nd floor
9' - 6"
2nd floor
9' - 6"
1 2
3 4
5 5.2
6 1.5
Transf. Platform
-6' - 0"

NEW ELEVATOR SHAFT

WALLS TO MATCH

EXISTING PAINTED BRICK
EXISTING PAINTED BRICK TO REMAIN.

NO CHANGE IN BUILDING COLOR (TYP.)
EXISTING PAINTED BRICK ACCENT TO REMAIN.

NO CHANGE IN BUILDING COLOR (TYP.)

EXISTING ROOF WITH ASPHALT
COMPOSITION SHINGLES TO REMAIN.

NO CHANGE TO EXISTING ROOF. (TYP)

NO CHANGE IN BUILDING HEIGHT
EXISTING HEIGHT: 27' - 3"

1. 2.

3. MINOR EXTERIOR CHANGES RELATED TO NEW ELEVATOR, AND REMOVAL OF STEEPLE. ALL OTHER EXTERIOR ELEMENTS ARE EXISTING TO REMAIN.

NO CHANGE IN BUILDING HEIGHT.

NO CHANGE IN BUILDING COLORS.

BENAJAMINE MOORE: HEAVEN #2118-70

MAIN COLOR
BENAJAMINE MOORE: MISTY MEMORIES #2118-60

ACCENT COLOR
As Noted
Scale:

Date:

Job #
These drawings and specifications are the
property and copyright of Haggerty
Construction and shall not be used or
duplicated in part or in whole on any other
work except by agreement with Haggerty
Construction.
2/27/2024 10:51:00 AM
A-08
Exterior Elevations
15 CHAPEL HILL DRIVE
NAPA CA 94559
23063
01/15/2024
Child Develpment Center
1/8" = 1'-0"
1 EXTERIOR EAST ELEVATION
Exterior Partial East Elevation - Image
Exterior Partial East Elevation - Image
Exterior Partial East Elevation - Image

ELEVATIONS NOTES

ONLY AREA OF CHANGE

EXTERIOR PAINT COLORS
Revision Schedule
# Date Description
A 02/26/2024 Preliminary
Planning
Comments
ATTACHMENT 5

Page 9 of 12 ends

MAIN FLOOR
0' - 0"

MAIN FLOOR
0' - 0"
T.O. PLATE
22' - 5"
T.O. PLATE
22' - 5"
2nd floor
9' - 6"
2nd floor
9' - 6"
A
B
E
G
G.1

NO CHANGE IN BUILDING HEIGHT
EXISTING HEIGHT: 27' - 3"

EXISTING STEEPLE

TO BE REMOVED
EXISTING PAINTED BRICK TO REMAIN.

NO CHANGE IN BUILDING COLOR (TYP.)
EXISTING PAINTED BRICK ACCENT TO REMAIN.

NO CHANGE IN BUILDING COLOR (TYP.)

EXISTING ROOF WITH ASPHALT
COMPOSITION SHINGLES TO REMAIN.

NO CHANGE TO EXISTING ROOF. (TYP)

MAIN FLOOR
0' - 0"
T.O. PLATE
22' - 5"
2nd floor
9' - 6"
C
D
F
H
Transf. Platform
-6' - 0"
EXISTING PAINTED BRICK TO REMAIN.

NO CHANGE IN BUILDING COLOR (TYP.)
EXISTING PAINTED BRICK ACCENT TO REMAIN.

NO CHANGE IN BUILDING COLOR (TYP.)

EXISTING ROOF WITH

ASPHALT COMPOSITION
SHINGLES TO REMAIN.

NO CHANGE TO EXISTING
ROOF. (TYP)

1. 2.

3. MINOR EXTERIOR CHANGES RELATED TO NEW ELEVATOR, AND REMOVAL OF STEEPLE. ALL OTHER EXTERIOR ELEMENTS ARE EXISTING TO REMAIN.

NO CHANGE IN BUILDING HEIGHT.

NO CHANGE IN BUILDING COLORS.

BENAJAMINE MOORE: HEAVEN #2118-70

MAIN COLOR
BENAJAMINE MOORE: MISTY MEMORIES #2118-60

ACCENT COLOR
As Noted
Scale:

Date:

Job #
These drawings and specifications are the
property and copyright of Haggerty
Construction and shall not be used or
duplicated in part or in whole on any other
work except by agreement with Haggerty
Construction.
2/27/2024 10:51:17 AM
A-09
Exterior Elevations
15 CHAPEL HILL DRIVE
NAPA CA 94559
23063
01/15/2024
Child Develpment Center
1/8" = 1'-0"
1 EXTERIOR SOUTH ELEVATION
Exterior Partial South Elevation - Image
1/8" = 1'-0"
2 EXTERIOR NORTH ELEVATION
Exterior Partial South Elevation - Image
Exterior Partial South Elevation - Image

ELEVATIONS NOTES

ONLY AREA

OF CHANGE

EXTERIOR PAINT COLORS
Revision Schedule
# Date Description
A 02/26/2024 Preliminary
Planning
Comments
ATTACHMENT 5

Page 10 of 12 ends

PROPOSED PLAY

STRUCTURE AREA

PROPOSED PLAY STRUCTURE AREA
As Noted
Scale:

Date:

Job #
These drawings and specifications are the
property and copyright of Haggerty
Construction and shall not be used or
duplicated in part or in whole on any other
work except by agreement with Haggerty
Construction.
2/27/2024 10:51:22 AM
A-10
Proposed Play Area
15 CHAPEL HILL DRIVE
NAPA CA 94559
23063
01/15/2024
Child Develpment Center

SITE - PLAY AREA
Elev-Play Area

PROPOSED - PLAY STRUCTURE - EXAMPLE

PROPOSED - PLAY STRUCTURE - EXAMPLE

PROPOSED - PLAY STRUCTURE - EXAMPLE
Revision Schedule
# Date Description
ATTACHMENT 5

Page 11 of 12 ends

COVERED WALKWAY
SEE 01/A-A11

COVERED WALKWAY
SEE 01/A-A11

SHADE STRUCTURE
SEE 5/A-11

SHADE STRUCTURE
SEE 5/A-11

SHADE STRUCTURE
SEE 3/A-11

SHADE STRUCTURE
SEE 4/A-11
As Noted
Scale:

Date:

Job #
These drawings and specifications are the
property and copyright of Haggerty
Construction and shall not be used or
duplicated in part or in whole on any other
work except by agreement with Haggerty
Construction.
2/27/2024 10:51:25 AM
A-11
Proposed Shade Sail
and Covered
Walkway Areas
15 CHAPEL HILL DRIVE
NAPA CA 94559
23063
01/15/2024
Child Develpment Center
Revision Schedule
# Date Description
1 SHADE SAIL AREAS
5 SHADE STRUCTURE
4 SHADE STRUCTURE
3 SHADE STRUCTURE
2 Covered Walkway
ATTACHMENT 5

Page 12 of 12 ends
← All documents from this meeting