CITY OF NAPA
Staff Reports
955 School Street
Napa, CA 94559
www.cityofnapa.org
To: Honorable Mayor and Members of City Council
From: Joy Eldredge, Utilities Director
Prepared By: Chris Jones, Senior Civil Engineer
TITLE:

Emergency Declaration for 36-inch Asbestos Cement Transmission Main Replacement RECOMMENDED ACTION:

Adopt a resolution (1) determining there is a need to continue the emergency action to execute and implement contracts for the construction to replace up to 11,000 linear feet of 36-inch asbestos cement transmission main; (2) approving a transfer in the amount of $11,000,000 from water CIP reserve fund balance account 531-35102 to CIP project account 53160139-63WT25UTER as documented in Council budget amendment No. 115; and (3) determining that the actions authorized by this resolution are exempt from CEQA
DISCUSSION:

The City of Napa water system provides potable water to 86,906 persons throughout City of Napa and unincorporated Napa County. On the western side of the city, potable water is transported from the Barwick Jamieson Treatment Plant through a 36-inch asbestos-cement (AC) transmission main to the City of Napa service area. The 36-inch AC transmission main was installed in 1968 and is only 56 years old. Typically, an AC main would have a 100-year service life.

The main is critical to the City’s ability to convey water throughout the City, without the 36-inch transmission main, the City relies on the 24-inch steel transmission main on the east side of the City and smaller local distribution mains. Any further disruptions at the same time as a 36-inch AC transmission main break can cause major impacts and restrict the ability to provide water for large portions of the City.

Since 2020, the City has had nine main breaks on the 36-inch AC transmission main. Four of these breaks have occurred in the last six months. Previously the majority of main breaks were on the south side of Napa in open fields near the Napa Sanitation District. More recently the breaks have been occurring under pavement on Laurel Street and Old Sonoma Road. Historically there have been only two breaks under pavement in the 56-year lifetime of the pipeline. One of which was due to the 2014 earthquake. The types of breaks have also changed. Most of the breaks in the past were due to failures at the rubber gaskets on the collars that hold two pieces of pipe together. Two of the more recent failures had holes in the pipe wall rather than at the gasket. These main breaks are a concern because they damage the surrounding pavement, may take several days to months to repair depending on location, and release large volumes of water that may severely damage public and/or private property.

File #: 008-2025, Version: 1
CITY OF NAPA Printed on 2/21/2025 Page 1 of 3
powered by Legistar™

Page 1 of 12 ends

ATTACHMENT 2
File #: 008-2025, Version: 1
City Staff has determined that due to the increased frequency of breaks and more damaging leaks that the 36-inch AC transmission main needs to be replaced by 36-inch steel pipe. The extent of this pipe replacement is up to 11,000 linear feet of main located on the following streets:
• Linda Vista Avenue
• Robinson Lane
• Browns Valley Road
• Laurel Street
• Foothill Boulevard
Additional distribution system improvements may be required such as installing pressure regulating stations or replacing up to 1,000 linear feet of 12” or smaller mains that will be critical to continue service while sections of the 36” transmission main are out of service. These improvements are needed to allow the City to replace multiple sections of the 36” transmission main concurrently to return the transmission main back to service as efficiently as possible.

The City has current projects to pave Laurel Street and Browns Valley Road. The Laurel Street paving has been postponed until 2025 with temporary paving in place until final paving can be installed. The Browns Valley Road project is expected to start with concrete sidewalks in January 2025 and asphalt paving later in 2025. Due to these projects the main replacement is being prioritized on Laurel Street and Browns Valley Road. By prioritizing these streets, the City will realize cost savings by avoiding repairing leaks that cause greater damage when the road surface is sealed under new pavement or installing a new main in new pavement and then needing to repave after the repair or installation has been completed.

Emergency Determination:

On January 16, 2025, for the reasons summarized in this report, the City Manager determined that the 36-inch AC main replacement requires immediate action to resolve an emergency and authorized the Utilities Director to execute emergency contracts. (See Attachment 2.) FINANCIAL IMPACTS:

A water fund CIP budget account 53160139-63WT25UTER is to be established for this project.

Funds in the amount of $18,478,149 are available in the CIP Reserve Fund Balance account 531- 35102. Upon approval, a transfer in the amount of $11,000,000 will be made to account 53160139- 63WT25UTER as documented in Council Budget Amendment No. 115.

CEQA:

City staff recommends that the City Council determine that the Recommended Action is exempt from CEQA pursuant to : CEQA Guidelines Section 15269 (Statutory exemption for emergency repairs, in accordance with California Public Resources Code Section 21080(b)(2)); CEQA Guidelines Section 15301 (Categorical exemption Class 1 Existing Facilities), which exempts repair, maintenance, or minor alteration of existing facilities involving negligible or no expansion of use; and CEQA Guidelines Section 15302 (Categorical Exemption Class 2 Replacement or Reconstruction), which exempts replacement or reconstruction of existing facilities on the same site and with the same purpose.

DOCUMENTS ATTACHED:

CITY OF NAPA Printed on 2/21/2025 Page 2 of 3
powered by Legistar™

Page 2 of 12 ends

ATTACHMENT 2
File #: 008-2025, Version: 1

ATCH 1 - Resolution

EX A - Council Budget Amendment No. 115

ATCH 2 - Emergency Declaration for 36-inch Asbestos Cement Transmission Main Replacement NOTIFICATION:

None
CITY OF NAPA Printed on 2/21/2025 Page 3 of 3
powered by Legistar™

Page 3 of 12 ends

ATTACHMENT 2
RESOLUTION R2025- 005

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
NAPA, STATE OF CALIFORNIA, ( 1) DETERMINING THERE

IS A NEED TO CONTINUE THE EMERGENCY ACTION TO

EXECUTE AND IMPLEMENT CONTRACTS FOR THE
CONSTRUCTION TO REPLACE UP TO 11, 000 LINEAR
FEET OF THE 36- INCH ASBESTOS CEMENT
TRANSMISSION MAIN; ( 2) APPROVING A TRANSFER IN
THE AMOUNT OF $ 11, 000, 000 FROM WATER CIP
RESERVE FUND BALANCE ACCOUNT 531- 35102 TO CIP
PROJECT ACCOUNT 53160139- 63WT25UTER AS
DOCUMENTED IN COUNCIL BUDGET AMENDMENT NO.
115; AND ( 3) DETERMINING THAT THE ACTIONS

AUTHORIZED BY THIS RESOLUTION ARE EXEMPT FROM
CEQA
WHEREAS, the City' s primary feed of potable water from the Barwick Jamieson Water Treatment Plant to the City of Napa service area is a 36- inch asbestos -cement AC) pipe installed in 1967; and
WHEREAS, the main is critical to the City' s ability to convey water throughout the City; and
WHEREAS, any further disruptions at the same time as a 36- inch AC transmission main break can cause major impacts and restrict the ability to provide water to large portions of the City; and
WHEREAS, the City has had nine main breaks on the 36- inch AC main since 2020. Four of these breaks have occurred in paved residential areas over the last six months. Two of the recent failures were due to holes in the pipe wall rather than at the joint; and
WHEREAS, 36- inch main breaks have the potential to damage surrounding pavement, may take several days to months to repair, and abruptly release large volumes of water that may severely damage public and/ or private property; and WHEREAS, due to the increased frequency of breaks and more damaging leaks, the 36- inch AC transmission main needs to be replaced by 36- inch steel pipe on an emergency basis; and
WHEREAS, on January 16, 2025, based on a recommendation from the Utilities Director, the City Manager made a written determination that the potential future risk of further damage to the public and/ or private property due to the 36- inch AC main breaks, poses a clear and imminent danger requiring immediate action for the replacement of the 36- inch AC transmission main to prevent or mitigate further loss or damage; and R2025- 005 Page 1 of 3 January 21, 2025

Page 4 of 12 ends

ATTACHMENT 2
WHEREAS, existing budget in the amount of $ 18,478, 149 is available in Water Capital Improvement Program ( CIP) Reserve Fund Balance Account 531- 35102 for capital improvements to the water system; and
WHEREAS, Staff has estimated project costs of $ 11, 000, 000 to replace up to 11, 000 feet of 36- inch AC transmission main; and
WHEREAS, the City Council has considered all information related to this matter, as presented at the public meetings of the City Council identified herein, including any supporting reports by City Staff, and any information provided during public meetings.

NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Napa, as follows:

1. The City Council hereby finds that the facts set forth in the recitals to this Resolution are true and correct and establish the factual basis for the City Council' s adoption of this Resolution.

2. The City Council hereby determines that the actions authorized by this Resolution are exempt from CEQA pursuant to: CEQA Guidelines Section 15269 Statutory exemption for emergency repairs, in accordance with California Public Resources Code Section 21080( b)( 2)); CEQA Guidelines Section 15301 ( Categorical exemption Class 1 Existing Facilities), which exempts repair, maintenance, or minor alteration of existing facilities involving negligible or no expansion of use; and CEQA Guidelines Section 15302 ( Categorical Exemption Class 2 Replacement or Reconstruction), which exempts replacement or reconstruction of existing facilities on the same site and with the same purpose.

3. The City Council hereby determines there is a need to continue the emergency action described in this resolution including the action to execute and implement contracts for the construction to replace up to 11, 000 feet of 36- inch AC transmission main, as initially authorized by the City Manager on January 16, 2025.

4. The City Council hereby approves a transfer in the amount of $ 11, 000, 000 from Water CIP Reserve Fund Balance Account 531- 35102 to CIP Project account 53160139- 63WT25UTER.

5. This Resolution shall take effect immediately upon its adoption.

R2025- 005 Page 2 of 3 January 21, 2025

Page 5 of 12 ends

ATTACHMENT 2
I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the City Council of the City of Napa at a public meeting of said City Council held on the 21st day of January 2025, by the following vote:

AYES: DeNatale, Luros, Sedgley
NOES: None
ABSENT: Narvaez, Painter
ABSTAIN: None
c KvATTEST: 6tn Caffany Car nza
City Clerk
Approved as to form:

Christopher Diaz"
Interim City Attorney
Exhibit A — Council Budget Amendment No. 115
R2025- 005 Page 3 of 3 January 21, 2025

Page 6 of 12 ends

ATTACHMENT 2

EXHIBIT A
Council Budget Amendment Journal # 115
The City Council hereby approves the budget adjustments for each City fund' s revenue and expenditure budget set forth in this Council Budget Amendment for Fiscal Year 2023. For both the Revenue Budget and Expenditure Budget columns, budget increases are shown with positive numbers and budget decreases with negative numbers.

Revenue
Budget Increase / Expenditure Budget
Fund Fund Name ( Decrease) Increase / ( Decrease)
100 General - -
101 General Non -Recurring - -
110 General ARPA - -
201 Gas Tax - -
202 RMRA - -
204 Red Light Camera - -
205 Measure T Road Maint - -
207 Golf Course - -
208 Enhanced Infra Financing Distr - -
210 DIF Big Ranch - -
211 DIF Fire/ Paramedic - -
212 DIF Affordable Housing - -
213 DIF Las Flores Rec Center - -
214 DIF Linda Vista - -
215 DIF Lone Oak Drainage - -
216 DIF N Jefferson Parks - -
217 DIF N Jefferson Traffic - -
218 DIF Orchard Parks - -
219 DIF Orchard Traffic - -
220 DIF Park Acq & Dev - -
221 DIF Parkin - -
222 DIF Redwood Rd - -
223 DIF Street Improvement - -
224 DIF Underground Utility - -
225 Fair Share Contrib/ Mitigat - -
230 Public Art - -
232 Property Development Tax - -
234 Public Infrastructure In Lieu - -
236 Parking - -
238 Alston Park Trust - -
240 Youth Services Diversion Prog - -
242 Fire Education Programs - -
255 Measure F 1 % TOT Aff Hsg - -
260 CDBG - -
270 HOME Program - -
275 CalHome Program - -
285 Perm Local Housing Allocation - -
290 Damage Reimbursement - -

Page 1 of 3 ends
Page 7 of 12 ends

ATTACHMENT 2
Revenue
Budget Increase / Expenditure Budget
Fund Fund Name ( Decrease) Increase / ( Decrease)
300 City Capital Projects - -
401 AD Altavina Maint Dist - -
402 AD Chaudhary Estates - -
403 AD Dry Creek Village - -
404 AD Fox Ridge - -
405 AD Glencar Estates - -
406 AD Hill View Park - -
407 AD Hyde Park I - -
408 AD Lake Park - -
409 AD Linda Vista - -
410 AD Mills - -
411 AD Napa Valley Corp Park - -
412 AD Oak Ridge - -
413 AD Orchard Estates - -
414 AD Oxford Garden - -
415 AD Rancho Las Flores - -
416 AD River Park Maintenance - -
417 AD Silverado Creek - -
418 AD Sunrise Meadows - -
419 AD Tierra Grove - -
420 AD Trancas - -
421 AD Vineyard Vista - -
422 AD Walnut Grove - -
423 AD Woodside - -
424 Storm Drain Fees - -
430 Tourism Improvement District - -
432 Business Dist Downtown - -
434 Business Dist Oxbow - -
436 Prop & Business Impr District - -
510 Materials Diverson- Operating - -
511 Materials Diversion- CIP - -
519 Materials Diversion- NR - -
530 Water Utility -Operating - -
531 Water Utility-CIP - 11, 000, 000. 00
539 Water Utility- NR - -
610 Fleet - -
611 Fleet Fire Apparatus - -
630 Information Technology - -
640 General Liability - -
641 Workers Compensation - -
642 Unemployment -
650 Postemployment Benefits - -
660 Equipment Replacement - -
701 Gasser CFD - -
841 Laurel Manor - -
842 Seminary Street - -
843 Section 8 - -

Page 2 of 3 ends
Page 8 of 12 ends

ATTACHMENT 2
Revenue
Budget Increase / Expenditure Budget
Fund Fund Name ( Decrease) Increase/( Decrease)
844 20% Low/ Mod Income
Local
847 Continuum of Care Program
848 Housing 5% RDA Supplemental
Total 11, 000, 000. 00
Interfund Transfers:

The above Council Budget Amendment includes the following Interfund Transfers:

Transfer In / Transfer Out /
Fund Fund Name Revenue Expenditure
CIP Projects:

The above Council Budget Amendment includes the following CIP Project Budget Changes:

Revenue
Budget Increase/ Expenditure Budget
Project Project Name ( Decrease) Increase/( Decrease)
63WT25UTER 36- in Water Transmission Main Replacement 11, 000 000. 00 I hereby certify that the forgoing Council Budget Amendment was duly approved by the City Council of the City of Napa at a public meeting held on January 21, 2025 City Clerk Signature
II
Date of Council Approval l l t l ZU 2S

Page 3 of 3 ends
Page 9 of 12 ends

ATTACHMENT 2

Page 10 of 12 ends

ATTACHMENT 2

Page 11 of 12 ends

ATTACHMENT 2

Page 12 of 12 ends

ATTACHMENT 2

← All documents from this meeting