ATTACHMENT 4
Project # Project Name Project Status
33FC26FD01 FIRE STATION #1 RENOVATION New
33FC26FD02 FIRE STATION #2 RENOVATION New
33FC26PD01 PD ADMIN SECURE STORAGE New
33FC26PD02 PD ADMIN PROXY LOCKS New
33FC26PD03 PD ADMIN CARPET REPLACEMENT New
33FC26PD04 PD RANGE SHADE STRUCTURES New
33FC26PW01 CORPORATION YARD MASTER PLAN New
33FC26PW02 CORP YARD RADIO TOWER GENERATOR New
33FC26PW03 CITY HALL OFFICE SPACE NORTH WING New
33FC26PW04 CORP YARD RESTROOM RENOVATION New
33FC27FD01 FIRE STATION #3 RENOVATION New
33FC27FD01 FIRE STATION #4 RENOVATION New
61MD26UT04 12KV ELECTRICAL SYSTEM INSTALLATION AT MDF New 61MD26UT06 MDF RAISING HEIGHT OF COMPOST RETENTION POND New 61MD26UT07 PERMANENT SWR EQUIPMENT STORAGE BAY AT CITY CORPORATION YARD New 61MD29UT02 COVERED AERATED STATIC PILE SYSTEM 2.0 New
33MS26CD01 PARKING LOT A, S, XW MAINTENANCE New
33PK26PR02 LAUREL PARK IMPROVEMENTS New
33PK27PR01 KLAMATH PARK IMPROVEMENTS New
33PA26PR01 TULOCAY BRIDGE STONE ART PROJECT New
33ST26PW02 STREET PREVENTIVE MAINTENANCE FY25/26 New
33ST26PW03 RIVERSIDE NEIGHBORHOOD REHABILITATION New
33ST26PW04 MONTGOMERY NEIGHBORHOOD REHABILITATION New
33ST26PW06 CITY/COUNTY JOINT PROJECT (PUEBLO AREA) New
33ST26PW07 GRANT MATCH BUILD IMOLA CORRIDOR New
33ST26PW08 GRANT MATCH - HSIP12 CALIFORNIA/PUEBLO INTERSECTION New 33ST26PW09 GRANT MATCH - HSIP12 SIGNAL IMPROVEMENTS New 33ST27PW01 STREET PREVENTIVE MAINTENANCE FY26/27 New
33ST27PW02 CITY/NAPASAN JOINT PROJECT (BEL AIRE AREA) New 33ST28PW01 STREET PREVENTIVE MAINTENANCE FY27/28 New
33ST29PW01 STREET PREVENTIVE MAINTENANCE FY28/29 New
33ST29PW02 JEFFERSON STREET REHABILITATION New
33ST30PW01 STREET PREVENTIVE MAINTENANCE FY29/30 New
63WD26UT01 WESTWOOD AREA WATER MAIN R&R New
63WD26UT02 FAIRVIEW AREA WATER MAIN REHAB New
63WD26UT04 PUEBLO WATER MAIN FROM MAIN ST TO SOSCOL New 63WD26UT05 SOSCOL CROSSING WATER MAIN REPLACEMENT AT TULOCAY BRIDGE New 63WD26UT06 W PUEBLO: COUNTY POCKET WATER IMPROVEMENTS WITH NAPASAN New 63WD26UT07 CLAY ST WATER MAIN REPLACEMENT, CALIFORNIA TO WALNUT New 63WQ26UTHP HTP TREATMENT IMPROVEMENTS New
63WQ28UTBP BJTP TREATMENT IMPROVEMENTS New
63WD27UT01 MONTECITO BLVD MAIN UPGRADE, LAKEVIEW TO MONTE VISTA New 63WT26UT08 PUEBLO 36-INCH WATER MAIN REPLACEMENT: LINDA VISTA TO SOLANO New 63WT26UT09 FOSTER/FOOTHILL: ST FRANCES TO LAUREL 36-INCH MAIN REPLACEMENT New 63WT27UTPS PUMP STATION IMPROVEMENTS New
63WT30UT01 SOSCOL FERRY RD FROM NAPA RIVER TO SHEEHY CT New 63WS26UT02 MILLIKEN DAM TOWER VALVE REPLACEMENT/REHAB New 33FC13PD01 POLICE RANGE IMPROVEMENTS Construction
33FC20PW03 POLICE & FIRE HVAC CHILLER Construction
33FC23PW01 CITYWIDE ROOFING RESTORATIONS Construction
33FC23PW04 GENERATORS FOR FACILITIES - PD, EOC Construction 33FC23PW05 GENERATORS FOR FACILITIES - CORPORATION YARD Construction 33FC24FD02 FIRE STATION #2 ELECTRICAL REPAIR & UPGRADE Construction 33FC24PW02 CLAY ST. PARKING GARAGE STRUCTURAL REPAIR Construction 33MS17PW01 ARTERIAL / GATEWAY ENHANCEMENT Construction
33PK18PR02 RESTROOMS, ALSTON PARK Construction
33PA22PR04 SOSCOL MEDIAN PUBLIC ART Construction
33SD16PW01 ROSE LANE SEWER SEPARATION Construction
33SD23PW01 STORM DRAIN INFRASTRUCTURE FUNDING Construction 33ST20PW10 LAUREL STREET REHAB Construction
33ST22PW03 BROWNS VLY RD/1ST ST Construction
33SW20PW02 WESTWOOD SIDEWALKS Construction
Project Status Summary
1 of 5
ATTACHMENT 4
Project # Project Name Project Status
Project Status Summary
33BP12PW01 HWY 29 CLASS 1 BIKEWAY FEASIBLITY Monitoring / Mitigation 33ST19PW10 BROWNS VALLEY/BUHMAN PARK Monitoring / Mitigation 33ST19PW09 BROWNS VALLEY/VALLEY GLEN Monitoring / Mitigation 33BR22PW01 BRIDGE ASSESS & REPAIR Active
33BR25PW01 TALL GRASS BRIDGE Active
33FC13PR01 2ND STREET GARAGE ELEVATOR Active
33FC22FD01 FIRE STATION FACIL. CONTROL ACCESS Active
33FC22PW01 CITY HALL ROOF Active
33FC22PW02 SENIOR CENTER PAVING & ADA Active
33FC22PW03 LAS FLORES COMMUNITY CENTER RENOVATION Active 33FC23CM01 CITY FACILITY PLANNING Active
33FC23FD01 FIRE STATION ALERTING SYSTEM Active
33FC23PD01 NAPA CENTRAL DISPATCH ALTERNATE ANS Active
33FC23PW02 CITYWIDE BUILDING FACILITIES EXTERIOR Active 33FC23PW03 CITYWIDE ACCESS BARRIER REMOVALS Active
33FC24FD01 FIRE STATION DORM & BATHROOM CONFIGURATION STUDY Active 33FC24FD03 FIRE STATION #2 DRAFT PIT REPAIR Active
33FC24PD01 PD ADMIN PARKING LOT GATES Active
33FC24PW01 FACILITIES ASSET MANAGEMENT Active
33FC24PW04 PLANNING PROJECT FOR CITY FLEET EV CHARGING Active 33FC24PW06 SURFACE REPAIR CITY PARKING LOTS (PD/CITYHALL/FS1) Active 33FC25FD01 FIRE STATION #3 PARKING LOT ACCESS CONTROL Active 61MD22UT04 MDF CONCRETE PAD PARTIAL REPLACEMENT Active
61MD24UT04 MDF MRF ROLL DOORS Active
61MD24UT09 MDF PERIODIC REPAIR OF INTERIOR CONCRETE Active 61MD24UT10 MDF STORMWATER IMPROVEMENTS Active
61MD25UT02 MDF RECYCLED WATER CONNECTION Active
61MD25UT03 MDF STORMWATER MITIGATION IMPROVEMENTS Active 61MD26UT01 MDF PARKING LOTS Active
61MD26UT03 SCALEHOUSE REPLACEMENT Active
61MD29UT01 MDF PERIMETER FENCING PARTIAL REPLACEMENT Active 33MS13PD02 CAD/RMS/MOBILE UPGRADE Active
33MS14PW01 WORKORDER ASSET MANAGEMENT Active
33MS21PW01 RIVER PARK MAINTENANCE PLAN Active
33MS24PW02 JEFFERSON STREET CORRIDOR PLAN Active
33MS24PW03 HSIP GRANT MATCHING Active
33MS24HG01 JEFFERSON/TROWER HOUSING PROJECT Active
33PK06PW01 HIDDEN GLEN PARK Active
33PK18PR05 PARKS SITE FURNISHING REPLACEMENT Active
33PK18PR07 PLAYGROUND EQUIPMENT REPLACEMENT Active
33PK22PR01 ABRUZZINI PARK IMPROVEMENTS Active
33PK24PR01 IRRIGATION CONTROLLER REPLACEMENT Active
33PK25PR01 PARK SHADE STRUCTURES PROJECT Active
33PK25PR02 PLAYGROUND & AMENITY PROJECT Active
33PA22PR03 PUBLIC ART IN PARKS Active
33PA23PR02 SR29 UNDERCROSSING PUBLIC ART Active
33PA23PR03 MAIN ST. / 2ND ST. PED SCRAMBLE ARTWORK Active 33SD24PW01 STORMDRAIN & CONVEYANCE REPAIRS Active
33SW18PW01 STORMWATER TRASH REDUCTION Active
33ST10PW05 PAVEMENT MANAGEMENT SYSTEM Active
33ST14PW04 SILVERADO-3RD-COOMSVILLE-EAST Active
33ST14PW05 TROWER AVE WIDENING Active
33ST18PW03 BROWNS VALLEY PED IMPROVMNTS Active
33ST18PW07 SOSCOL/IMOLA INTERSECTN Active
33ST19PW02 UNCONTROLLED CROSSWALK IMPROVEMENT Active
33ST20PW04 TRAFFIC SIGNAL WITH INTERCONNECT Active
33ST20PW09 COOMBS ST & S COOMBS ST REHAB Active
33ST22PW04 COOMBSVILLE REHAB 3RD-PASCALE Active
33ST22PW05 WESTWOOD REHAB INTERIOR Active
33ST22PW08 COOMBSVILLE PASCALE-EAST END Active
33ST22PW09 WESTWOOD STREET LIGHTING Active
33ST23PW03 LINCOLN AVE REHAB-CALIFORNIA TO SIL Active
2 of 5
ATTACHMENT 4
Project # Project Name Project Status
Project Status Summary
33ST23PW04 REDWOOD ROAD REHABILITATION-DRY CREEK TO CAROL Active 33ST23PW06 STREET PREVENTIVE MAINTENANCE FY22/23 Active 33ST23PW07 RRFB PEDESTRIAN IMPROVEMENTS (TFCA GRANT) Active 33ST24PW05 STREET PREVENTIVE MAINTENANCE FY23/24 Active 33ST24PW06 HSIP PEDESTRIAN IMPROVEMENTS Active
33ST24PW07 HSIP HIGH-FRICTION PAVEMENT Active
33ST25PW01 STREET PREVENTIVE MAINTENANCE FY24/25 Active 33ST25PW02 OLD SONOMA ROAD REHABILITATION Active
33ST26PW01 JEFFERSON STREET TRANCAS TO LINCOLN Active
33TS24PW02 TRAFFIC SIGNAL EQUIPMENT UPGRADES Active
63WA20UT01 WATER WORKORDER ASSET MGMT Active
63WA25UT01 WORKORDER ASSET MANAGEMENT Active
63WD22UT08 BROWNS VALLEY RD WATER MAIN REPLACEMENTS Active 63WD22UT11 OLD SONOMA RD WTR MAIN REPLACEMENT Active
63WD22UT13 OLD SONOMA RD PRESS REG STN Active
63WD24UT11 DOWNTOWN EAST SIDE PRESSURE REGULATING STATION Active 63WD24UT13 WESTGATE PRESSURE REGULATION STATION Active
63WD24UT14 EAST AVE WATER MAIN REPLACEMENTS Active
63WD24UTHV HYDRANT AND VALVE REHAB & REPLACEMENT Active 63WD25UT07 MONTGOMERY AREA WATER MAIN R&R Active
63WD25UTDV DEVELOPMENT RELATED IMPROVEMENTS Active
63WD25UTMT METER REPLACEMENT AND ERT UPGRADE PROGRAM Active 63WD25UTRR WATER MAIN REHAB & REPLACEMENT Active
63WD26UTHV HYDRANT AND VALVE REHAB & REPLACEMENT Active 63WD26UTMT METER REPLACEMENT AND ERT UPGRADE PROGRAM Active 63WD26UTRR WATER MAIN REHAB & REPLACEMENT Active
63WD27UTDV DEVELOPMENT RELATED IMPROVEMENTS Active
63WD27UTHV HYDRANT AND VALVE REHAB & REPLACEMENT Active 63WD27UTMT METER REPLACEMENT AND ERT UPGRADE PROGRAM Active 63WD27UTRR WATER MAIN REHAB & REPLACEMENT Active
63WD28UTDV DEVELOPMENT RELATED IMPROVEMENTS Active
63WD28UTHV HYDRANT AND VALVE REHAB & REPLACEMENT Active 63WD28UTMT METER REPLACEMENT AND ERT UPGRADE PROGRAM Active 63WD28UTRR WATER MAIN REHAB & REPLACEMENT Active
63WQ20UT02 SCADA IMPROVEMENT Active
63WQ20UT03 BJTP CLEARWELL MIXER/AERATOR Active
63WQ23UT01 HTP REHAB AND IMPROVEMENTS DESIGN Active
63WQ23UT07 HTP PAVING IMPROVEMENTS Active
63WQ23UT09 MILLIKEN PLANT REHAB EXISTING FACILITIES Active 63WQ24UT06 BJTP CHAIN & FLIGHT RENOVATION Active
63WQ24UT09 MILLIKEN TP UPGRADE DESIGN Active
63WQ24UTBP BJTP TREATMENT IMPROVEMENTS Active
63WQ26UT01 BJTP DEWATERING FACILITY CONSTRUCTION Active 63WQ28UT02 HTP UPGRADES Active
63WT20UT02 CIPP PIPELINE IMPROVEMENTS (PG&E VALVE LOT) Active 63WT20UT04 FALCON RIDGE TANK REPLACEMENT Active
63WT22UT02 CONN LINE COATING Active
63WT24UT05 HILLCREST DR PIPELINE IMPROVEMENTS PHASE 1 Active 63WT24UT06 SHORELINE MAIN FOR FLOOD CONTROL PROJECT Active 63WT24UT07 DOT SOSCOL TULOCAY BRIDGE MAIN REPLACEMENT Active 63WT24UT08 ACCESS RD FOR 36-IN TRANSM MAIN Active
63WT24UTTK STORAGE TANK CLEANING & COATING Active
63WT24UTTV TRANSMISSION LINE VALVE REHAB/REPLACE Active 63WT25UTER 36-IN WATER MAIN EMERGENCY REPLACEMENT Active 63WT26UTTK STORAGE TANK CLEANING & COATING Active
63WT26UTTV TRANSMISSION MAIN VALVE REHAB Active
63WT27UTTK STORAGE TANK CLEANING & COATING Active
63WT27UTTV TRANSMISSION MAIN VALVE REHAB Active
63WT28UTTK STORAGE TANK CLEANING & COATING Active
63WT28UTTV TRANSMISSION MAIN VALVE REHAB Active
63WS23UT01 HENNESSEY SPILLWAY FLOW EXPANSION DESIGN Active 63WS24UT03 WATERSHED ROAD/CULVERT REPAIRS Active
3 of 5
ATTACHMENT 4
Project # Project Name Project Status
Project Status Summary
63WS26UT03 HENNESSEY IN-RESERVOIR IMPROVEMENTS Active
9017FR20 MILLIKEN RAW WATER PIPELINE HARDENING HMGP Active 9017FR11 MILLIKEN DIVERSION DAM ACCESS ROAD WALKWAYS Carryover 33BR24PW01 FEASIBILITY STUDY FOR OXBOW/THIRD ST. CONNECTOR Completed 33BR05PW01 TRANCAS BRIDGE SCOUR REPAIR Completed
33FC15PW02 CITY HALL CONSOLIDATION STUDY Completed
33FC20PW01 FACILITY CONDITION ASSESSMENT Completed
33FC21PW01 CITY HALL MODIFICATION PROJECT Completed
33FC22PW04 CORP YARD ELECTRICAL EVAL Completed
33FC22PW05 CSB ELECTRICAL EVALUATION Completed
33FC22PW06 PARKING FCA & ADA ASSESS Completed
33FC22PW07 SENIOR CENTER PEDESTRIAN BRIDGE Completed
33FC23PD02 ALT EOC & EMERGENCY COOLING CENTER Completed 33PK18PR06 CORP YARD COVERED CANOPY Completed
61MD24UT05 MDF MRF BUILDING EXTERIOR PAINTING Completed 61MD24UT06 MDF LIGHTING UPGRADE Completed
61MD24UT08 MDF IN-GROUND VEHICLE WEIGH SCALE Completed
33MS17CD02 ELECTRIC GARAGE OCCUPY SIGNS Completed
33MS23PW01 LAKE PARK PUMP STATION Completed
33MS24PW01 SURVEY MONUMENT NETWORK PROJECT Completed
33PK16PR01 SPORTS COURT RESURFACING Completed
33PK16PR02 PARKS PARKING LOTS & PATHWAYS Completed
33PK16PR03 PLAYGROUND EQUIPMENT REPL 2016 Completed
33PK23PR01 KENNEDY GOLF COURSE BACKFLOW DEVICE Completed 33SW23PW01 YAJOME SIDEWALK REPAIR Completed
33SD11PW01 CAMILLE CRK BANK STABILIZATION Completed
33SD22PW01 STORM DRAIN INFRAST CONDITION ASMT Completed 33ST14PW07 SIERRA AVE EXTENSION TO VILLA Completed
33ST15PW02 TROWER AVE EXT TO BIG RANCH (PLAN LINE) Completed 33ST16PW02 SALVADOR AVENUE WIDENING Completed
33ST21PW06 OLD SOSCOL WAY IMPROVEMENTS Completed
33ST14PW02 1ST & 2ND ST ROUNDABOUT Completed
33ST19PW03 1ST 2ND & CALI UTILITY MAINT Completed
33ST20PW08 SOSCOL AVE REHAB Completed
33ST22PW06 JEFFERSON STREET REHAB - TROWER TO SIERRA Completed 33ST23PW02 FREEWAY DRIVE REHABILITATION Completed
63WD24UT09 WESTWOOD HARRISON CORNWALL R&R Completed
63WD24UTDV DEVELOPMENT RELATED IMPRV Completed
63WD24UTMT METER REPLACEMENT AND ERT UPGRADE PROGRAM Completed 63WD24UTRR WATER MAIN REHAB & REPLACEMENT Completed
63WD25UT05 CONGRESS VALLEY WATER METER REPLACEMENTS Completed 63WD25UTHV HYDRANT AND VALVE REHAB & REPLACEMENT Completed 9015F206 FEMA HDD OLD SONOMA ROAD & HWY 29, AND REDWOOD RD Completed 63WT22UT03 TRANSMISSION LINE VALVE REHAB/REPLACE Completed 63WT24UTRR TRANSMISSION LINE REHAB/REPLACE Completed
9017FR01 FEMA HILLCREST PUMP STATION Completed
9017FR02 FEMA SILVERADO HIGHLANDS PUMP STATION Completed 9017FR10 MILLIKEN RAW WATER PIPELINE Completed
33FC24PW07 CONGRESSIONALLY DIRECTED FUNDING FOR EV CHARGING Delayed 33MS18CD01 DOWNTOWN PARKING GARAGE Delayed
33SD17PW03 TROWER STORMDRAIN IMPROVEMENTS Delayed
33ST11PW02 BIG RANCH ROAD WIDENING Delayed
33ST16PW01 ROUNDABOUTS WEST OF SR29 Delayed
33ST18PW01 LINDA VISTA REDWOOD TO TROWER Delayed
33ST22PW07 IMOLA REHAB SOSCOL-EAST END Delayed
33TS24PW01 TRANCAS STREET AT CLAREMONT SIGNAL Delayed
33ST26PW05 JEFFERSON ST. REHAB (SIERRA TO TRANCAS) Delayed 33UU12PW01 RULE 20A PROJ JEFFERSON STREET Delayed
33UU18PW01 JEFFERSON STREET UNDERGROUND Delayed
33UU18PW02 THIRD ST UNDERGROUNDING 20B Delayed
33UU17PW01 TRANCAS RULE 20A Delayed
33FC24PW03 CITY HALL TRANSFORMER Not Moving Forward
4 of 5
ATTACHMENT 4
Project # Project Name Project Status
Project Status Summary
33FC24PW05 PEARL ST DEPOT DEMOLITION Not Moving Forward 33MS12RA01 PEARL STREET SURFACE PKNG LOT Not Moving Forward 33ST22PW02 W LINCOLN AVE-LONE OAK TO SOLANO AVE. Not Moving Forward 33TS25PW01 TRAFFIC SIGNAL UPGRADE PUEBLO AT SOSCOL Not Moving Forward 63WD24UT08 REGAL FOREST CAMILLA INSTALLATION AND UPGRADES Not Moving Forward 63WD24UT10 LAUREL GRIGGS TO FREEWAY R&R Not Moving Forward 63WD26UTDV DEVELOPMENT RELATED IMPROVEMENTS Not Moving Forward 63WQ25UT09 MILLIKEN TP UPGRADES Not Moving Forward
63WQ26UT02 HTP UPGRADES DESIGN Not Moving Forward
63WQ27UT02 HTP UPGRADES PHASE I Not Moving Forward
63WT25UTTK STORAGE TANK CLEANING & COATING Not Moving Forward 63WT25UTTV TRANSMISSION MAIN VALVE REHAB Not Moving Forward 63WS27UT02 HENNESSEY SPILLWAY FLOW EXPANSION Not Moving Forward 5 of 5
ATCH 4 - Project Status Summary
Napa City Council
April 28, 2025
- Document
- ATCH 4 - Project Status Summary
- Meeting
- April 28, 2025
- Body
- Napa City Council
- Original file
- 586 KB
Text extracted from the city's file for reading and search. Open the original on napacity.legistar1.com. That file is the official record.