729 Heinz Avenue #7 | Berkeley CA 94710 | 510.542.2212 | [email protected] 21 February 2026
Ali Koenig, Parks Planning Manager
City of Napa
RE: New Public Recreation and Aquatics Center
Architectural Planning and Design Services
Dear Ms. Koenig and Selection Committee,
The former Harvest Middle School site represents a rare opportunity for the City of Napa to create a shared community recreational amenity that reflects how residents of all ages gather, exercise, play and connect. Centrally located and adjacent to several neighborhoods, it is currently used by the community as an informal open space and carries both history and expectations for the future. We see this project as more than a new facility. It is a chance to shape a welcoming public asset that will enhance the quality of life for Napa’s diverse residents today and remain adaptable over time.
We understand the City’s goal to deliver a recreation and aquatics center that responds directly to community priorities while remaining realistic about cost, operations, and long-term stewardship.
The emphasis on inclusive engagement, aspirational objectives balanced with practicality, public art, and phased development all reflect a thoughtful approach to a complex and highly visible public investment. This is the type of work the Noll & Tam Architects team is well-suited to lead.
Our experience includes planning and design of public recreation and aquatic facilities for various communities in Northern California. We regularly partner with cities to guide large, multi-stakeholder projects from early visioning through council approved design, to completion of construction. Our approach prioritizes clear choices, transparent cost information, and steady coordination with city staff so decisions made in early planning remain durable in later phases.
Phase I is foundational. The community engagement effort, evaluation of alternatives, and development of a phased conceptual plan will establish the framework for all future work. We have assembled a focused team of proven partners to support this effort. WRT Planning and Design will lead landscape and urban planning, bringing expertise in organizing large, active sites into cohesive and durable civic environments. Contigo Communications will support inclusive, bilingual outreach and facilitation that reflects Napa’s diverse community. Together, our team is prepared to lead a disciplined and collaborative process that prioritizes accessibility, responsiveness, and clarity while maintaining schedule and budget alignment.
We have reviewed the Request for Proposals and the City’s draft Professional Services Agreement.
We are prepared to accept the terms and conditions as outlined, including all issued addenda. Our proposal is valid for 90 days from the submittal deadline. No subconsultant will commence work until all required insurance coverage is in place.
Thank you for your consideration. We welcome the opportunity to further discuss our proposal.
Janet Tam, FAIA, LEED AP (Licensed Architect #C14064)
Principal in Charge
INCORPORATED 4/1/2000
“C” CORPORATION
ATTACHMENT 2
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 01
COMPANY INFORMATION
At Noll & Tam Architects, every
project begins with understanding
the people and places it serves.
Founded in 1992 by Christopher
Noll and Janet Tam, our
women owned firm has built a
practice centered on community
engagement, environmental
responsibility, and the belief
that public architecture should
strengthen civic life.
For more than three decades,
we have focused on civic and
educational facilities, including
aquatic centers and multi use,
multi generational community
and recreation environments. Our
work in the public sector reflects a
consistent commitment to creating
spaces that support connection,
belonging, and well being while
responding to operational realities
and long term stewardship.
We bring extensive experience in
aquatics design, working closely
with specialized pool consultants
from the earliest planning stages
through construction. This
coordination ensures technical
rigor, efficient systems integration,
and facilities that perform reliably
over time while remaining
welcoming and adaptable.
Our services span early feasibility,
programming, site analysis, and
master planning through full
design and complex renovation.
Across all phases, we balance
technical requirements with the
cultural and social context of each
community, developing practical,
budget conscious solutions
shaped through collaboration with
clients and stakeholders.
Our work has been recognized
by the American Institute of
Architects, California Construction,
the International Interior Design
Association, and others, reflecting
our long standing dedication to
thoughtful, community centered
public design.
Ownership:
C Corporation
Locations:
729 Heinz Avenue #7
Berkeley, CA 94710
337 17th Street, Suite 209
Oakland, CA 94612
Number of Employees: 41
Location of Team: Berkeley
Years in Operation: 34 Years
Errors and Omissions Claims
History: None
Litigation Statement:
Noll & Tam Architects has
never been involved in
litigation or arbitration in
history of our practice.
CONSULTANT
ANTIOCH COMMUNITY CENTER
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 02
SELECTED PUBLIC
SECTOR CLIENTS
Napa County
City of St. Helena
Sonoma County
Town of Corte Madera
City of Berkeley
City and County of
San Francisco
City of Larkspur
North Marin Water District
Town of San Anselmo
Solano Community
College District
Sonoma State University
City of El Cerrito
City of Alameda
Castro Valley Sanitary District
Alameda County General
Services Agency
City of Fairfield
City of Millbrae
City of Antioch
City of Los Altos
County of Santa Clara
City of Benicia
City of Half Moon Bay
City of Capitola
City of Marina
Hayward Area Recreation and
Park District (HARD)
City of Oakland
City of East Palo Alto
City of Huntington Beach
City of Livermore
City of Menlo Park
City of Milpitas
City of Morgan Hill
City of Mt. Shasta
City of Oakley
City of Palo Alto
Midpeninsula Regional Open
Space District
FINANCIAL STABILITY STATEMENT
Noll & Tam has built a stable and
loyal client base for 30+ years of
working with public agencies. Our
focus on civic, community, and
institutional projects has allowed
us to maintain steady growth,
even through periods of economic
fluctuation. Public-sector clients
tend to be fiscally responsible
and mission-driven, and we value
the long-term relationships we’ve
developed with cities, counties,
and public agencies throughout
California. Additionally, see
attached bank reference.
February 18, 2026
Ali Koenig
Parks Planning Manager
City of Napa
Parks and Recreation Department
955 School Street
Napa, CA 94559
Subject: Noll & Tam Architects Bank Verification Letter Dear Ali,
Please accept this letter as certification of Noll & Tam Architects’ good standing with Mechanics Bank. There has been no NSF activity, and all loans have been paid as agreed since 2006.
Best regards,
Samone Shafer, MBA
Senior Vice President
Business Banking Manager
NorCal, East Bay, and Central Valley Markets
Mechanics Bank
Mobile 209.276.8371
[email protected]
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 03
City budgets are tight, resources
are limited, and communities
need facilities that do more
than ever before. Park and Rec
departments have to rethink
planning and design to maximize
public investment while meeting
social, wellness, and cultural
needs. In Noll & Tam’s 30+ years
of designing for communities we
have developed creative strategies,
and implemented new ideas for
facilities that deliver more value for
communities, spaces that become
greater than the sum of their parts.
AQUATICS
Noll & Tam brings many years of
experience in the planning and
design of public aquatics facilities
within multi use community and
recreation centers. These include
indoor and outdoor recreation,
leisure, splash pads and natural
water features.
We collaborate closely with
specialized pool consultants,
often Aquatic Design Group,
from the earliest stages
of programming and site
planning. This early coordination
supports realistic budgeting,
constructability, and long term
facility performance, reducing risk
for the City during both design
and construction.
Our aquatic projects are grounded
in functional and operational
planning consideration of both
recreational and competitive
team needs, security and safety,
and cost recovery. We work with
aquatics city staff, community
swimmers, and competitive
aquatics groups to align program
priorities with budget realities. The
result is recreation and aquatics
facilities that are adaptable,
maintainable, and durable.
Centennial Recreation Center
The 50,000 SF Centennial
Recreation Center in Morgan
Hill integrates a robust aquatics
program with complementary
recreation and community uses
within a cohesive civic facility
adjacent to a community park.
The indoor aquatics component
includes a leisure pool with
interactive water features,
instructional areas, and lap swim
accommodations designed to
support recreation, learn to
swim programs, and family use
throughout the year.
The natatorium environment
was carefully coordinated to
address humidity control, energy
performance, acoustics, and
spectator comfort, ensuring long
term operational efficiency and
durability. The aquatics program is
seamlessly connected to the rest
of the building, which includes a
gymnasium, aerobics room, fitness
training areas, senior center, youth
center, childcare facility, computer
lab, and a multipurpose room with
a full kitchen.
Additional Project Experience
• Pinole Swim Center
• Scott Valley Swim and
Tennis Club
• Pattullo Swim Center
• Sunnyvale Swim Complex at
Fremont High School
• Hearst Gymnasium Pool
Renovations
CENTENNIAL RECREATION CENTER
PINOLE SWIM CENTER
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 04
MULTI
GENERATIONAL
A successful recreation center
must serve residents at every
stage of life. This means
creating environments where
youth programs, teen activities,
adult fitness, senior gatherings,
and family events can occur
simultaneously without conflict.
Multi generational design requires
thoughtful adjacencies, acoustic
separation, clear circulation, and
flexible rooms that can shift as
programs change.
Our experience demonstrates how
carefully planned shared spaces
can support intergenerational
interaction while still providing
comfort, safety, and independence
for group, resulting in facilities
that feel welcoming, inclusive, and
active from morning to evening.
Age Well Center at
South Fremont
The Center expands the City’s
senior services into a diverse and
growing neighborhood, increasing
access to programs and daily
gathering spaces. The LEED Silver
building includes flexible activity
and fitness rooms, a commercial
kitchen, and dedicated staff and
administrative areas to support
efficient operations. Careful
attention to accessibility, comfort,
and visibility ensures it functions
as a welcoming and active hub
within the broader community.
San Pablo Community Center
Located in the civic core adjacent
to Helms Middle School and
shared recreation fields, this
community center was shaped
through a participatory planning
process that translated broad
community input into a clear and
achievable program.
The center provides indoor and
outdoor gathering environments
that accommodate daily
programming, informal connection,
and large community events.
Flexible commons spaces anchor
the building, including a tall, light
filled lobby with a small café, a
computer lab, a youth room, and
a multipurpose room that opens
directly to an outdoor courtyard.
COMMUNITY
GATHERING
Community gathering spaces
are the heart of a recreation
center. These environments need
to support daily programming,
informal connection, special
events, and flexible use across
generations. We design gathering
spaces that are adaptable, easy
to operate, and welcoming, with
careful attention to acoustics,
visibility, circulation, and indoor to
outdoor relationships.
Antioch Community Center
This 35,000 SF recreation
facility was developed through a
collaborative planning process to
create flexible, revenue supporting
gathering spaces that serve
daily programming and large
community events.
The facility is anchored by a
multi use gymnasium designed
to support both recreational use
and revenue generation. A large
community hall and adjacent
classrooms can be configured into
a single event space or divided
into smaller rooms using operable
partitions, allowing the building
to adapt throughout the day and
evening.
The design emphasizes strong
indoor and outdoor relationships,
connecting gathering spaces to
exterior terraces and landscape
while incorporating sustainable
strategies that reduce energy use
and improve comfort. Careful site
orientation and shading strategies
respond to the surrounding hills
and climate, creating welcoming,
light filled spaces that function
efficiently and serve as an active
community hub.
AGE WELL CENTER AT SOUTH FREMONT
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 05
Cherryland Community Center
Noll & Tam partnered with the
Alameda County Redevelopment
Agency and Hayward Area
Recreation and Park District to
plan and design a new community
center serving the unincorporated
community of Cherryland. During
the concept phase, we evaluated
multiple site locations and building
size options to align community
priorities, site constraints, and
funding realities before advancing
a preferred solution.
Through a series of community
workshops and steering
committee meetings, we helped
residents define clear program
priorities and translate a broad
range of aspirations into a focused,
buildable plan. The resulting
facility provides flexible gathering
spaces designed to support
daily programs, youth and senior
activities, and large community
events. Sited adjacent to the
historic Meek Estate, the building
draws from the area’s agricultural
heritage while establishing a
welcoming civic presence that
reinforces neighborhood identity
and serves as a reliable hub for
community life.
ACTIVE
RECREATION
An important part of encouraging
wellness in a community is well
planned active recreation. Fields,
courts, gymnasiums, and outdoor
training areas must be carefully
positioned to support safety,
access, durability, and efficient
operations while fitting within
a larger town or city setting. At
the Napa site, where existing
facilities, circulation, and future
development all intersect, strategic
and creative site design will be
essential. This is why we have
teamed with WRT, whose expertise
in large scale park planning and
active recreation environments
strengthens our ability to organize
movement, adjacencies, and long
term phasing into a cohesive and
resilient recreation campus.
Walnut Creek Park
Master Plan
Our team led the master planning
and conceptual site design effort,
guiding the City through program
confirmation, site alternatives,
cost alignment, and a phased
implementation strategy before
advancing into full design.
Situated within the heavily used
Heather Farm Park, the project
required careful coordination to
maintain park operations while
reorganizing circulation, parking,
and recreation amenities. The
design integrates a 50 meter
competition pool, a recreational
pool, changing facilities, and a
new community center within
a cohesive campus framework
that strengthens pedestrian
connections and reinforces the
broader park system. Outdoor
terraces, gathering spaces, and
clear circulation patterns support
daily recreation, events, and high
volume use.
Los Altos Community Center
Designed to support the
multi generational needs and
sustainability goals of Los Altos,
this 25,000 SF community center
integrates indoor recreation with
outdoor active space. Shaped
through a robust community
process, the building is organized
around a central courtyard that
connects interior program areas
directly to outdoor activity zones,
encouraging movement and
flexible use throughout the day.
In addition to indoor gathering
and program spaces, the project
includes two outdoor bocce
courts and complementary
recreation amenities that extend
programming beyond the building
footprint. The strong indoor and
outdoor relationship supports
active lifestyles while allowing
programs to expand and adapt
seasonally.
LOS ALTOS COMMUNITY CENTER
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 06
Company Ownership:
LLC - Out of State
Office Locations:
San Francisco
Philadelphia
Number of Employees:
104
Assigned Personnel
Location(s):
San Francisco
References:
Megan Tiernan
Capital Planning and
Development Director, HARD,
[email protected]
Tara McIntire, Projects
and Design Manager,
Marin County Parks,
[email protected]
Vincente Zuniga, Recreation
and Parks Director, City of
San Leandro,
[email protected]
Founded in 1963 , Wallace Roberts & Todd, LLC (WRT) is a team of planners, urban designers, landscape architects, and architects. Their team is uniquely qualified to lead the landscape architecture and site design for the City of Napa’s new Public Recreation and Aquatics Center, bringing a strong combination of civic park expertise, aquatics integration, urban design thinking, and deep familiarity with Napa Valley and surrounding communities. Their work consistently extends beyond site boundaries to strengthen citywide park systems, multimodal connectivity, and public realm identity. WRT brings a proven ability to balance high-performance recreational landscapes with a civic, community-centered design sensibility. Their team excels at translating big-picture planning concepts into detailed, buildable landscape architectural solutions that elevate both user experience and long-term operational success.
WRT has previously partnered with the City of Napa on the conceptual and schematic design for the downtown pedestrian mall revitalization, delivering a thoughtful, well-received design vision that reinforced Napa’s urban character and sense of place. WRT also brings strong regional experience throughout the North Bay and Central Valley, including projects in St. Helena (in collaboration with Noll & Tam), Yountville, Sonoma, and Fairfield.
WRT also brings deep experience integrating aquatics and water-based recreation into civic landscapes. Relevant work includes park concepts in Fresno featuring aquatics and splash elements, the completed Ashland Zócalo in Alameda County, which incorporates a signature fog fountain as a civic gathering feature, and the Student Wellness Center at San Francisco State University, developed in partnership with WRNS, which includes a major aquatic component within a dense campus environment.
SUBCONSULTANT
Authorized Signature Date
WRT has read and will agree to abide by the awarded Consultants obligations.
02/03/2026
SOUTHEAST FRESNO SOCCER COMPLEX
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 07
Company Ownership:
Susana Razo, Principal
and Owner
Office Location:
2176 Palou Ave
San Francisco, CA 94124.
Number of Employees: 3
Number of Contractors: 11
Assigned Personnel
Location(s):
San Francisco
References:
Michal Lambert
City Librarian
San Francisco Public Library
[email protected]
LaShonda White
Deputy City Manager of
Community Services
City of Richmond
LaShonda_Wilson@
ci.richmond.ca.us
Ontario Smith
Principal & COO
Somos Group
[email protected]
Contigo Communications is a minority woman-owned business that started in 2017 and brings over 30 years of experience in community engagement. They specialize in strategic communications, community outreach, and meaningful engagement of diverse groups and hard-to- reach communities. They enhance their client’s organizational capacity to engage with diverse groups to help ensure equitable results and overall effectiveness.
Contigo means with you in Spanish, and it is the firm’s belief that engagement begins with deep listening. They help their clients attune to equity and access issues, so challenges are identified early, and they design engagement that is effective amongst diverse groups. Through listening and partnering work, their work contributes to better project outcomes, community resilience, and vitality.
“Susana Razo is inspiring, professional and knowledgeable. She takes the time to understand her client’s needs and the local political landscape.
Susana engages in productive relationships and trust with everyone, even those with opposing interests. She is both strategic and great at the nuts and bolts of communications.”
— Patrick Sweeney, Superintendent, Napa Valley Unified School District
SUBCONSULTANT
Authorized Signature Date
Contigo Communications has read and will agree to abide by the awarded Consultants obligations.
02/03/2026
RICHMOND LIBRARY COMMUNITY ENGAGEMENT WITH NOLL & TAM
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 08
Authorized Signature Date
Company Ownership:
S Corporation
Office Locations:
Napa
Santa Rosa (HQ)
Healdsburg
Oakland
Number of Employees:
37 (2 in Napa, 2 in Healdsburg,
33 in Santa Rosa)
Assigned Personnel
Location(s):
Napa
Santa Rosa
References:
Julie Lucido
Public Works Director
City of Napa
[email protected]
Mark Tomko
District Manager
Vallejo Flood &
Wastewater District
mtomko@vallejowastewater.
org
John Ferons
Director
Town of Yountville,
Public Works
[email protected]
Founded in 1954 , Cinquini & Passarino, Inc. has built a strong reputation for dependable service across the North Bay, serving both municipal and private clients. Their expertise covers topographic, boundary, bathymetric, right of way, GPS, and construction surveys, as well as terrestrial laser scanning and GIS data collection.
Since 2007, the company has consistently worked with the City of Napa, mainly as an on-call consultant, and recently conducted an ALTA Survey and Record of Survey for the Harvest Middle School property named in the subject RFP.
Cinquini & Passarino utilizes the latest technology in surveying and mapping. They use Total Stations, Electronic Field Books, Laser Scanners, Railroad Trolleys, Global Positioning Technology, and CAD/computer aided drafting equipment. Their survey vehicles are fully equipped with the latest field survey instruments and mobile phones. Cinquini & Passarino field personnel are extensively trained, highly skilled, licensed and/or certified surveyors and chainmen. Typically, during construction months they provide four to five survey crews and we can provide a sixth crew on a moment’s notice.
We are proud members of the California Land Surveyor’s Association, American Council of Engineering Companies, American Society of Civil Engineers, Home Builders Association, North Coast Builder’s Exchange, the American Congress on Surveying & Mapping, Railroad Engineering and Maintenance Suppliers Association, American Railway Engineering, and Maintenance-of-Way Association.
Cinquini & Passarino has read and will agree to abide by the awarded Consultants obligations.
HARVEST MIDDLE SCHOOL
ALTA SURVEY & ROS
NAPA 5-WAY INTERSECTION
BOUNDARY SURVEY & ROS
SUBCONSULTANT
February 19, 2026
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 09
Company Ownership:
Corporation
Office Locations :
2226 Faraday Avenue
Carlsbad, CA 92008
Number of Employees :
Local: 16 employees
National: 5 employees
Assigned Personnel
Location(s): Carlsbad
References:
Jim Wheeler
General Manager
Hayward Area Recreation
District
[email protected]
Jill Nunes
Director of Parks & Recreation
Cordova Rec & Park District
[email protected]
Tom Hellmann
Community and Cultural
Services Manager
City of Folsom
[email protected]
Since 1984, Aquatic Design Group (ADG) has worked with clients from around the globe to help bring their dreams to reality. This experience results in quality, efficient design solutions that lead to projects delivered on time and on budget. ADG has worked on projects of all shapes and sizes in 47 states and 27 countries around the world.
ADG has set the standard for quality design and consulting services within the aquatics industry. ADG is dedicated to the highest possible level of customer satisfaction, delivered in a professional manner by a team of talented individuals who love what they do.
ADG is focused on swimming pool and water feature architectural, structural, mechanical and electrical design services within the following market segments: parks and recreation, higher education, high schools, hospitality, health care, and anything else that might call for an aquatics specialist. ADG specializes in all types of water including: competition, recreation, leisure, therapy, and ornamental and natural water features.
ADG’s staff of 21 includes: a third-generation pool designer; two former distributors of pool equipment and chemicals; three former D-1 competitive swimmers; two former aquatic center operators; two former swim coaches; and a pool contractor with more than 30 years’ experience building pools. ADG are a highly trained group of talented designers, project managers, technicians, and administrative staff, all guided by a passion for aquatic facilities and those who experience them. ADG knows what it takes to bring an aquatic facility to reality.
SUBCONSULTANT
Authorized Signature Date
Aquatic Design Group has read and will agree to abide by the awarded Consultants obligations.
2/5/2026
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 10
Authorized Signature Date
Company Ownership:
S Corporation
Office Locations :
Columbia, MO
San Diego, CA
Longview, TX
Dillon, CO
Number of Employees :
5 Full-time
1 Part-time
Assigned Personnel
Location(s):
Columbia, MO (Darin Barr)
Longview, TX (Scott Caron)
References:
Annabel Grimm
General Manager
Chico Area Recreation
& Park District
[email protected]
Steve Voorhies
Director of Parks & Recreation
City of Concord
[email protected]
Toni Lundgren
Deputy Parks &
Recreation Director
City of Manteca
[email protected]
Ballard*King & Associates (B*K) is nationally respected as experts in the field of strategic operational, feasibility studies and master plans for new and existing aquatics, sports, parks, fitness, ice skating and recreation facilities. B*K’s client base includes public agencies, colleges and universities, the non-profit sector and private entities. They are frequently invited to speak at state and national industry conferences and have been honored to be the recipient of five Athletic Business “Facilities of Merit” awards.
Ballard*King & Associates was established in 1992 by Ken Ballard and Jeff King in response to the need for market-driven and reality-based planning for recreation facilities. B*K has achieved 30+ years of success by realizing that each client’s needs are specific and unique. With over 70 combined years of facility management and planning experience in the collegiate, public, non-profit and private sector, B*K’s consulting firm has completed over 800 projects in all 50 states and has working relationships with more than 100 architects coast-to-coast.
B*K’s team members all have direct experience in the opening, operation and management of indoor and outdoor recreation facilities from full service recreation centers, to aquatic facilities and ice rinks. In addition, Their staff has direct experience in the delivery of diverse recreation programs and services. From pinpointing specifics to broad visions, B*K provides meaningful analysis, thoughtful consideration, expertise and services to ensure the long-term sustainability and success of their client’s project. B*K’s top concern is the client’s best interests and they have a keen awareness of the impact a sports or recreational park or facility has on a community and subsequently the department that operates it. They aim to help their clients see the full potential of their project by providing trustworthy services to achieve their goal.
Ballard*King & Associates has read and will agree to abide by the awarded Consultants obligations.
02/5/2026
SUBCONSULTANT
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 11
Company Ownership:
CA Corporation
Office Locations:
Novato
Petaluma
Redwood City
Pleasanton
San Jose
Richmond
Berkeley
Number of Employees:
44 Assigned Personnel
Location(s):
Richmond
Novato
References:
Kevin McGowan
Public Works Director
City of Sausalito
[email protected]
Rachel Calvert
Senior Civil Engineer
County of Marin
[email protected]
Scott Christie, PE
Director of Public Works &
Engineering
City of Orinda
[email protected]
CSWST2 will support the Noll & Tam by providing civil engineering, land surveying, and site infrastructure design services throughout planning, design, and construction phases of the Project. Their role will focus on existing conditions analysis, topographic surveying, site layout, grading and drainage design, utility coordination, and construction support, ensuring the Project is deliverable, code-compliant, and constructible within the City’s budget and schedule expectations.
Founded in 1954 incorporated in 1990 , CSWST2 is a design firm specializing in economical and environmentally sustainable projects across the recreation, urban infill, transportation, education, and public infrastructure sectors. Their team includes more than 40 professionals, including civil and traffic engineers, urban planners, landscape architects, and surveyors. With nearly 70 years of experience supporting public agencies throughout the Bay Area, they deliver practical, cost-effective solutions grounded in real-world implementation.
Their firm is a California Corporation with offices in Novato, Pleasanton, Richmond, Petaluma, Redwood City, Berkeley, and San Jose, allowing them to provide responsive local support. CSWST2 is experienced working as part of multidisciplinary consultant teams on complex public recreation and park projects and understands the coordination, documentation, and schedule discipline required to support a successful prime-led effort.
SUBCONSULTANT
Authorized Signature Date
CSWST2 has read and will agree to abide by the awarded Consultants obligations.
02/19/2026
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 12
Since 1960 KPFF has provided creative, constructible solutions for projects of all types, scales, and industries. They approach every design challenge to fulfill their passion for solving problems, delivering technical excellence, and enabling the continued growth and creativity of their people, partners, and profession. They listen attentively, they adapt, and they tailor their systems to fit the unique challenges of each project.
KPFF delivers comprehensive structural engineering services for a wide range of civic and recreation projects. They partner with public agencies at the local, county, state, and federal levels, as well as private commercial developers, and take pride in supporting their projects and clients every step of the way. They proactively participate through the entire design and construction process, and work hard to cultivate the types of relationships that lead to collaborative and lean solutions. They apply the latest technologies including BIM, AI, sustainability modeling, and analytical software to explore and develop new strategies and solutions while remaining grounded in practicality.
RELEVANT EXPERIENCE:
• Redwood City YMCA; Redwood City, CA
• Herz Recreation Center; San Francisco, CA
• Boys & Girls Club of San Francisco; San Francisco, CA • La Petite Baleen Swim School; San Francisco, CA
• Tice Creek Fitness Center Exp. & Reno.; Walnut Creek, CA • The HUB Community Center; San Francisco, CA
• Everett Alvarez Performing Arts Center; Salinas, CA
• Roseville Sports Center; Roseville, CA
• Union City Gymnasium; Union City, CA
• UC Merced Student Rec. & Wellness Center; Merced, CA
• Livermore Comm. Center & Aquatic Facility; Livermore, CA • George Sim Community Center; Sacramento, CA
• Almaden Valley Athletic Facility; San Jose, CA
SUBCONSULTANT
Authorized Signature Date
Company Ownership:
WA Corporation
Office Locations:
Total Number of Employees:
Local: 51 Employees
National: 1,415 Employees
Assigned Personnel Location:
San Francisco
References:
Rich Denio
Supervising Structural
Engineer
DSA
[email protected]
Kathy Riggins
Retired CEO
YMCA Silicon Valley
[email protected]
Nick Simonidis
Project Director
DGS
[email protected]
KPFF has read and will agree to abide by the awarded Consultants obligations.
2/12/26
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 13
Company Ownership:
CA Corporation
Office Locations:
Emeryville
Roseville
Clovis
San Luis Obispo
Los Angeles
Irvine
Riverside
Palm Springs
Carlsbad
Number of Employees:
180
Assigned Personnel
Location(s):
Emeryville
References:
Richard Joaquin, RLA, ASLA
Parks Planning and
Development Manager
City of Tracy Parks,
Recreation and Community
Services Department
[email protected]
Mike Vickers
Assistant Public Works Director
City of Walnut Creek
[email protected]
Hai-Ping Mo
Bond Project Manager
Hayward Area Recreation &
Park District
[email protected]
Founded in 1976, LSA is a 100 percent employee-owned environmental consulting firm with 180 employees in nine offices throughout California.
LSA has 50 years of experience helping clients navigate the often- complex process of environmental review pursuant to the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA). While environmental planning and environmental assessment are LSA’s core practice areas, the firm also offers technical expertise in the areas of biological resources; wetland permitting; air quality; noise; climate change; cultural, historic, and paleontological resources; land use and community planning; natural resources; transportation; water quality; geographic information systems (GIS); graphics, and document management.
From their work in the city of Napa and adjacent areas since 1997, LSA brings extensive knowledge of the area’s resources and environmental issues to provide time- and cost-effective services. Their proposed team for this project has successfully completed numerous environmental review documents under contract to lead agencies for a wide range of public facility, recreation, institutional, and infill development projects on sites in urban and suburban areas throughout Northern California.
Recent projects include the New Aquatic and Community Center at Heather Farm Park in Walnut Creek, Fremont Central Park Community Center Project in the City of Fremont, El Pescadero Park & Multi- Generational Recreation Center Project in the City of Tracy and the San Bruno Recreation and Aquatic Center Project in the City of San Bruno.
LSA’s staff is thoroughly knowledgeable regarding CEQA and NEPA procedures and requirements. LSA is also well versed in the current regulatory landscape and has longstanding relationships with the California Department of Fish and Wildlife, the Regional Water Quality Control Board, the United States Army Corps of Engineers, and the National Marine Fisheries Service, necessary to navigate the complex regulatory permitting requirements to successfully deliver projects to construction.
SUBCONSULTANT
NOLL & TAM ARCHITECTS NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 15 Company Ownership:
CA Corporation
Office Locations:
Emeryville
Roseville
Clovis
San Luis Obispo
Los Angeles
Irvine
Riverside
Palm Springs
Carlsbad
Number of Employees:
180
Assigned Personnel
Location(s):
Emeryville
References:
Richard Joaquin, RLA, ASLA
Parks Planning and
Development Manager
City of Tracy Parks,
Recreation and Community
Services Department
[email protected]
Mike Vickers
Assistant Public Works Director
City of Walnut Creek
[email protected]
Hai-Ping Mo
Bond Project Manager
Hayward Area Recreation &
Park District
[email protected]
Founded in 1976, LSA is a 100 percent employee-owned environmental consulting firm with 180 employees in nine offices throughout California.
LSA has 50 years of experience helping clients navigate the often- complex process of environmental review pursuant to the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA). While environmental planning and environmental assessment are LSA’s core practice areas, the firm also offers technical expertise in the areas of biological resources; wetland permitting; air quality; noise; climate change; cultural, historic, and paleontological resources; land use and community planning; natural resources; transportation; water quality; geographic information systems (GIS); graphics, and document management.
From their work in the city of Napa and adjacent areas since 1997, LSA brings extensive knowledge of the area’s resources and environmental issues to provide time- and cost-effective services. Their proposed team for this project has successfully completed numerous environmental review documents under contract to lead agencies for a wide range of public facility, recreation, institutional, and infill development projects on sites in urban and suburban areas throughout Northern California.
Recent projects include the New Aquatic and Community Center at Heather Farm Park in Walnut Creek, Fremont Central Park Community Center Project in the City of Fremont, El Pescadero Park & Multi- Generational Recreation Center Project in the City of Tracy and the San Bruno Recreation and Aquatic Center Project in the City of San Bruno.
LSA’s staff is thoroughly knowledgeable regarding CEQA and NEPA procedures and requirements. LSA is also well versed in the current regulatory landscape and has longstanding relationships with the California Department of Fish and Wildlife, the Regional Water Quality Control Board, the United States Army Corps of Engineers, and the National Marine Fisheries Service, necessary to navigate the complex regulatory permitting requirements to successfully deliver projects to construction.
SUBCONSULTANT
Authorized Signature Date
LSA has read and will agree to abide by the awarded Consultants obligations.
2/20/2026
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 14
Company Ownership:
CA Corporation
Office Locations:
4340 Redwood Hwy # 245
San Rafael, CA 94903
Number of Employees:
28 Assigned Personnel
Location(s):
San Rafael
References:
Paul Melloni
Facilities Director
Liberty Union High
School District
[email protected]
Tenaya Dale
Vice President
Counterpoint
Construction Services
[email protected]
Jennie Bruneman
Facilities Director
West Sonoma County Union
High School District
[email protected].
ca.us
O’Mahony & Myer is a consulting engineering firm specializing in civic, commercial, and educational electrical engineering and lighting design.
Founded in 1979, O’Mahony & Myer provides full service electrical engineering and lighting design services to architects, engineers, municipalities, and building owners.
O’Mahony & Myer has designed the electrical and lighting systems for over 30 community pool facilities in and around the Bay Area. These have included full-fledged aquatic centers such as the Elk Grove Aquatic Center, Newark Community Center Natatorium, and the Salinas Municipal Pool. They are adept at managing the deck-side and site lighting required of community aquatic centers – where light pollution and light spill can be major concerns for the surrounding neighborhoods. In addition to their experience with aquatic facilities, they have extensive experience designing in-center computer labs, multi-use rooms, dining room/kitchen facilities, ball fields, gymnasiums, and other amenities found in modern community recreation centers
SUBCONSULTANT
Authorized Signature Date
O’Mahony & Myer has read and will agree to abide by the awarded Consultants obligations.
2/19/26
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 15
Company Ownership:
LLP
Office Locations:
1080 Marina Village Pkwy,
Alameda, CA 94501
Number of Employees:
22 Assigned Personnel
Location(s):
Alameda
References:
Jon Salisbury
Cabrillo College
[email protected]
Tracy Marcial
Contra Costa Community
College District
[email protected]
Suna Yatagama
County of San Mateo, Energy
Program Manager
[email protected]
Founded in 1995 , Taylor Engineers is a nationally recognized engineering firm specializing in building mechanical systems design, energy conservation and energy analysis, energy management and control system design, and system commissioning.
HVAC, Plumbing + Fire Sprinkler Design
Over the years, Taylor Engineers has built a national reputation as experts in HVAC, plumbing, and fire sprinkler systems design. Our work can be found serving large commercial, institutional, and residential buildings. We provide performance specifications, design review, and project coordination to ensure that systems interface properly with those of other trades. Taylor Engineers is professionally recognized for expertise in data centers, underfloor air distribution systems, optimized VAV systems, and central chilled water plants. We frequently serve as an owner’s representative in the selection and oversight of design/build mechanical, plumbing and fire protection contractors.
Control System Design
Taylor Engineers is recognized among consulting engineering firms for its unique control systems design and commissioning experience. Critical to the caliber of our work is the detail and clarity of our specifications— an integral factor known to prevent contractor error
Building Performance Analysis
Taylor Engineers addresses critical industry challenges by utilizing a broad range of analysis capabilities to effectively enhance building design and performance. Through building energy simulation, we can better inform our design decisions, conduct life cycle cost analyses and support code and LEED evaluations.
SUBCONSULTANT
Authorized Signature Date
Taylor Engineers has read and will agree to abide by the awarded Consultants obligations.
LOS ALTOS COMMUNITY CENTER WITH NOLL & TAM
2/19/26
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 16
Company Ownership:
C Corporation
Office Locations:
Napa
Santa Rosa
Lakeport
Number of Employees:
Local: 36
National: 400+
Assigned Personnel
Location(s):
Santa Rosa
References:
Ali Koenig
Parks Planning Manager
City of Napa
[email protected],
Jonathan Sanglerat
Deputy Director of
Public Works
City of Petaluma
[email protected];
Gavin Glascott
Associate Engineer
Napa Sanitation District
[email protected]
Originally established in 1991 , RGH Consultants (RGH) now has joined Geo-Logic Associates (GLA), an employee-owned, multidisciplinary environmental, civil and geotechnical engineering consulting firm, now with more than 400 employees located in 30 offices across the United States and abroad. RGH’s Principals, Eric Chase, Jared Pratt, and Travis Whitted, will maintain leadership of the Santa Rosa, Napa, and Lakeport offices, and as a wholly owned subsidiary of GLA, will continue to serve their clients in Northern California and beyond. RGH locally has 36 employees with expertise in geotechnical engineering, engineering geology, construction observation and testing services, as well as their in-house geotechnical testing laboratory expanded to include concrete and asphalt testing.
Their diversified Santa Rosa staff of engineers, geologists, field engineers/technicians, laboratory technicians, and administrative staff provide RGH with the personnel to tackle public works projects including design level geotechnical studies, geotechnical peer reviews, construction observation and testing, special inspections, and materials testing. RGH has successfully provided these types of services for the cities of Napa, Cotati, Healdsburg, Petaluma, Rohnert Park, Santa Rosa, Sonoma, and Corte Madera, including design and construction of buildings, roadways, pavement rehabilitation and replacement, utility pipelines, pump stations, bridges, and park improvements.
Their in-house laboratory is certified by the California Department of Transportation (Caltrans); the American Association of State Highway and Transportation Officials (AASHTO) Resource, formerly AMRL; the Cement and Concrete Reference Laboratory (CCRL), which is a division of ASTM International; the California Division of the State Architect (DSA); and the United States Army Corps of Engineers (USACE). RGH’s laboratory personnel are certified by Caltrans and the National Institute for Certification in Engineering Technologies (NICET). RGH’s field personnel are certified by the Caltrans, the California Division of the State Architect (DSA), the American Concrete Institute (ACI), and the International Council of Building Officials (ICBO).
SUBCONSULTANT
Authorized Signature Date
RGH Consultants has read and will agree to abide by the awarded Consultants obligations.
2/19/26
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 01
Ned Reifenstein
Project Architect/
Planner
PROJECT TEAM & KEY PERSONNEL
Our team is aligned around
delivering a thoughtful, community
grounded solution that balances
aspiration with feasibility,
operational realities, and long term
stewardship. We approach projects
like Napa’s recreation and aquatics
center as civic investments
that require clear decision
making, disciplined phasing, and
meaningful public engagement
from the outset.
We are committing a stable,
senior led team for the duration
of the project to ensure continuity,
accountability, and consistent
leadership throughout each
phase. Supporting this effort is
a comprehensive subconsultant
team, most of which we have
worked with before. They all
have direct experience in their
disciplines to deliver the Napa
Recreation & Aquatics Center
on-time and on-budget. We
respect your local business
preference and have included
Cinquini & Passarino and RGH
Geotechinical Engineers who both
have offices in Napa.
Noll & Tam resumes follow and
Consultant resumes can be found
in the appendix.
NOLL & TAM ARCHITECTS
CITY OF NAPA
Janet Tam
Principal in Charge
SUBCONSULTANTS
WRT
Landscape Architecture
CONTIGO
Community Outreach
CINQUINI & PASSARINO
Survey
ADG
Aquatics
BALLARD*KING
Programming
CSW
Civil Engineering
KPFF
Structural Engineering
LSA
CEQA/Traffic
OMM
Electrical Engineer
Jocelyn Lawrence
Barish
Project Manager
RGH
Geotechnical Engineer
TAYLOR ENGINEERS
Mechanical/Plumbing
TBD
Cost Estimating
Tom Beil
Project Designer
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 02
AVAILABILITY
Noll & Tam has carefully reviewed
our current commitments and the
projected workload of the team
proposed for this project. We have
confirmed that the individuals
identified have the capacity and
availability to fully support the
City’s schedule and deliver the
work without compromising
existing obligations. We are
prepared to commit the necessary
time, leadership, and resources to
ensure consistent engagement
and responsive service throughout
each phase of the project.
Key Personnel
Name
Firm Name
& Office
Location
Licenses and
Certifications
Role
on the
Project
List of Current Projects and
% of Time on Each Project
% of
Time
on this
Project
Janet Tam Noll & Tam
Berkeley
#C14064 Principal in
Charge
Walnut Creek Aquatics (10%),
SFUSD Rosa Parks ES (10%),
Zoo Projects (5%), SSFUSD
Sunshine Gardens (5%)
15-20%
Jocelyn
Lawrence
Barish
Noll & Tam
Berkeley
N/A Project
Manager
Walnut Creek Aquatics (45%) 45%
Ned
Reifenstein
Noll & Tam
Berkeley
#C29879 Project
Architect/
Planner
Mission College (20%), Walnut
Creek Aquatics (10%)
30%
Tom Beil Noll & Tam
Berkeley
#C23664 Project
Designer
Larkspur Library and
Community Center (10%), City
of Berkeley On-call (30%)
40%
ANTIOCH COMMUNITY CENTER
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 03
WALNUT CREEK NEW AQUATIC
AND COMMUNITY CENTER
CHERRYLAND COMMUNITY CENTER
A co-founder of Noll & Tam, Janet brings over 40 years of professional experience designing resilient, public environments for communities. Her project expertise includes the spectrum of civic facilities including multi- generational community centers serving multiple uses. She has led many complex initiatives, guiding clients through challenging programmatic requirements while achieving outcomes that elevate community impact.
With her deep understanding of the outward facing public process, Janet brings leadership, design insight, and strategic thinking to our varied projects in close partnership with our municipal clients. She is recognized for her ability to analyze multifaceted programs and synthesize them into cohesive design solutions, excelling at listening to diverse stakeholders, aligning project goals with technical constraints, and guiding teams toward facilities that support both immediate operational needs and an enduring community vision.
JANET TAM, FAIA, LEED AP
NOLL & TAM ARCHITECTS
RELEVANT PROJECT EXPERIENCE
Walnut Creek New Aquatic and
Community Center at Heather
Farm Park
Los Altos Community Center
Cherryland Community Center
Age Well Center at South Fremont
Antioch Community Center
Centennial Recreation Center,
Morgan Hill
Benicia Community Center
San Pablo Community Center
Santa Clara Community Center
Renovation
Berkeley YMCA-PG&E Teen
Center
Golden Gate Recreation Center
Feasibility Study, Oakland
Fremont Recreation Center
Feasibility Study
Corte Madera Community Center
& Town Park Master Plan
Pleasanton Youth & Community
Center Study
PRINCIPAL IN CHARGE
CALIFORNIA REGISTRATION
Licensed Architect #C14064
EDUCATION
Master of Architecture,
University of California, Berkeley
Bachelor of Arts,
Environmental Design, University
of California, Berkeley
TENURE
Years with firm: 33
Years of experience: 43
ANTIOCH COMMUNITY CENTER
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 04
Jocelyn is a seasoned designer and project manager at Noll & Tam, where she specializes in tackling some of the firm’s most distinctive and intricate projects. Since joining the firm in 2016, she has played a pivotal role in shaping the built environment through a community-focused and environmentally conscious lens. Jocelyn has successfully led the planning and design of numerous Parks & Recreation projects, which have included facility assessments and innovative approaches to meeting community needs.
A dynamic communicator, Jocelyn excels in public speaking and cross- cultural engagement, fostering meaningful connections with diverse user groups. Her eclectic professional background reflects a deep passion for the wide-ranging possibilities of architecture, from adaptive reuse to sustainable design. This versatility enables her to seamlessly integrate creative solutions with practical requirements, enhancing the livability and resilience of every project she undertakes.
JOCELYN LAWRENCE BARISH
NOLL & TAM ARCHITECTS
RELEVANT PROJECT EXPERIENCE
Walnut Creek New Aquatic and
Community Center at Heather
Farm Park
Urban Tilth North Richmond Farm
Walnut Creek Park
Planning Services
Half Moon Bay Library
Merritt College Landscape
Horticulture Complex, Oakland
Diablo Valley College San Ramon
Campus Expansion
International House, Berkeley
Renovation Projects
San Francisco Unified School
District Buena Vista Horace Mann
School Modernization
UC Berkeley Tang Center
Pharmacy Expansion
Berkeley City College Annex
DeAnza Flint Center Study
URBAN TILTH NORTH
RICHMOND FARM
PROJECT MANAGER
EDUCATION
Master of Architecture,
University of Washington
Bachelor of Arts in History,
Bachelor of Science in Zoology,
University of Washington
TENURE
Years with firm: 9
Years of experience: 11
REFERENCES
Walnut Creek New Aquatic and
Community Center
Rich Payne
Public Works Director
City of Walnut Creek
925.256.3586
[email protected]
Merritt College Landscape
Horticulture Complex
Amy Marshall
Director of Capital Projects, Laney
Peralta Community College District
510.986.6984
[email protected]
Urban Tilth North
Richmond Farm
Doria Robinson
Executive Director
Urban Tilth
510.778.5886
[email protected]
MERRITT COLLEGE LANDSCAPE
HORTICULTURE COMPLEX
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 05
Ned is a registered architect, urban designer, and planner with extensive experience leading civic and public sector projects from early planning through construction. He has managed complex, multi stakeholder efforts that require clear coordination, technical rigor, and steady engagement with City staff and community groups. His background in urban planning gives him a strong understanding of how large community facilities must respond to site context, circulation, adjacencies, and long term growth.
As our Director of Sustainable Design, Ned integrates practical, high performing environmental strategies that support operational efficiency and long term maintainability. His work emphasizes resilient systems, energy performance, and lifecycle value, ensuring that facilities such as recreation and aquatics centers are not only well designed but also fiscally responsible and durable over time.
NED REIFENSTEIN, LEED AP BD+C
NOLL & TAM ARCHITECTS
RELEVANT PROJECT EXPERIENCE
Walnut Creek New Aquatic and
Community Center at Heather
Farm Park
Cherryland Community Center,
Hayward
San Leandro Mulford-Marina
New Library
College of Alameda New Center
for Liberal Arts
Oakland Zoo California Trail
Merritt College Landscape
Horticulture Complex
SFUSD Buena Vista Horace Mann
School Modernization
John T. Chambers Technology
Center, University of the Pacific,
Stockton*
San Francisco Conservatory of
Music, San Francisco*
University of California, Berkeley
College of Natural Resources
Oxford Tract Study
Haas School of Business
Renovation*
PROJECT ARCHITECT / PLANNER
CALIFORNIA REGISTRATION
Licensed Architect #C29879
EDUCATION
Master of Urban Design,
University of California, Berkeley
Master of Architecture, MIT
Bachelor of Arts
Yale University
TENURE
Years with firm: 12
Years of experience: 29
REFERENCES
Cherryland Community Center
Monty Boyd
Senior Bond Program Manager
Hayward Area Recreation District
(formerly with Co. of Alameda)
510.272.3753
[email protected]
College of Alameda
New Center for Liberal Arts
Tim Karas
Superintendent/President
Mendocino College
707.468.3002
[email protected]
Walnut Creek New Aquatic and
Community Center
Rich Payne
Public Works Director
City of Walnut Creek
925.256.3586
[email protected]
* WITH PREVIOUS FIRM
WALNUT CREEK NEW AQUATIC
AND COMMUNITY CENTER
CHERRYLAND COMMUNITY CENTER
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 06
Tom brings decades of experience in architectural design, with a career focused on creating thoughtful, community-driven environments.
With Noll & Tam, he has contributed to a wide range of civic, cultural, and community projects, guiding them from early concept through construction with a steady hand and clear vision.
Tom excels at synthesizing program goals, technical requirements, and stakeholder input into clear and compelling design directions. He is adept at developing design options, refining details, and ensuring that project outcomes remain aligned with client priorities. His approach is grounded in strong communication and collaborative problem solving, working closely with clients, consultants, and contractors to maintain design integrity throughout all phases of the project.
TOM BEIL
NOLL & TAM ARCHITECTS
RELEVANT PROJECT EXPERIENCE
North Berkeley Senior Center
Renovation
Age Well Center at South Fremont
Felton Branch Library
Berkeley South Senior Center
New Discovery Center at Sulphur
Creek Nature Center
Ora Loma Sanitary District
Consolidated Facilities
St. Helena Civic Facilities
Visioning Study
Urban Tilth North Richmond Farm
Chrisman California Islands Center
Laney College Library & Learning
Resource Center, Oakland
Stanford University Cecil H. Green
Library Renovation
Berkeley Central Library
Renovations
Richmond Public Library
Main Branch Renovation
San Rafael Downtown Carnegie
Library Renovation
University of California, Berkeley
Stern Hall Seismic Upgrades
Foothill Hall Seismic Upgrades
PROJECT DESIGNER
CALIFORNIA REGISTRATION
Licensed Architect #C29879
EDUCATION
Bachelor of Arts in Architecture,
University of Texas, Austin
TENURE
Years with firm: 8
Years of experience: 38
* WITH PREVIOUS FIRM
NORTH BERKELEY
SENIOR CENTER RENOVATION
AGE WELL CENTER AT
SOUTH FREMONT
NEW DISCOVERY CENTER AT
SULPHUR CREEK NATURE CENTER
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 01
RELEVANT PROJECT EXPERIENCE
AND REFERENCES
The following projects are
organized to reflect the core
program components of the
Napa project: Aquatics, Multi
Generational, Community
Gathering, and Active Recreation.
Together, they demonstrate our
experience delivering complex
public recreation facilities that
require thoughtful planning,
inclusive engagement, disciplined
cost alignment, and long term
stewardship.
Each example illustrates our
ability to guide cities from
early visioning and alternatives
through approved concepts and
into successful implementation.
Across these projects, we have
balanced technical performance,
operational efficiency, and
community priorities in highly
visible community settings where
phasing, daily operations, and long
term adaptability are critical.
Recognizing the importance of
comprehensive site organization
and integrated open space design
for this site, we have included
a representative project from
our partner WRT. This example
reflects our shared commitment
to cohesive planning; to align
buildings, landscape, circulation,
and recreation amenities into a
unified and durable complex..
PROJECT INFORMATION
Client: City of Walnut Creek
Location: Walnut Creek, CA
Dates: June 2023 – In Progress
Project Status: In Construction
Scope: Planning to Design
through Construction
Key Personnel:
Janet Tam, PIC
Jocelyn Lawrence Barish, PM
Ned Reifenstein, PA
Initial Design Fee - Concept to
CA: $6.06M (Full Team)
Final Design Fee: In Progress
Construction Budget: $61M
Accepted Bid: $52.5M
(Currently in construction)
Client Project Manager:
Rich Payne
Public Works Director
City of Walnut Creek
925.256.3586
[email protected]
WALNUT CREEK NEW AQUATIC AND
COMMUNITY CENTER AT
HEATHER FARM PARK
Currently under construction, the new center replaces the aging Community Center and Clarke Swim Center within the active setting of Heather Farm Park. Working in partnership with RRM Design Group, our team led the master planning and conceptual site design process, guiding the City through program confirmation, site alternatives, cost alignment, and phasing strategy before advancing into full design.
Located within a well used park environment, the project required careful coordination to maintain ongoing park operations while planning for long term replacement facilities. The final design integrates a 50-meter competition pool, a recreational pool, changing facilities, a new community center with multi-purpose rooms and classrooms, and a central atrium designed to support informal gathering and daily use.
Outdoor gardens, event terraces, and strong pedestrian connections tie the building into the broader park system.
The project demonstrates our ability to lead large scale public recreation and aquatic planning efforts, balance community priorities with operational realities, and translate a phased conceptual vision into a cohesive, buildable civic facility.
WALNUT CREEK GROUNDBREAKING
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 02
WALNUT CREEK NEW AQUATIC AND COMMUNITY CENTER
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 03
LOS ALTOS COMMUNITY CENTER
Noll & Tam partnered with the City of Los Altos to design a new 25,000 SF multi-generational community center that reflects evolving community needs and long term operational priorities. The project began with extensive engagement with City Council and a Project Task Force to confirm program, test adjacencies, and align scope with budget before advancing into design.
The resulting facility includes a large community room, three flexible multi purpose rooms, a catering kitchen, and a City operated preschool.
The building was carefully right sized to the site and program, with indoor and outdoor spaces designed to expand functionality and support a wide range of daily activities and special events. The project demonstrates our ability to translate community input into clear design direction, create adaptable recreation environments, and deliver civic facilities that serve as both everyday gathering spaces and resilient essential services hubs.
PROJECT INFORMATION
Client: City of Los Altos
Location: Los Altos, CA
Dates: Jul 2017 - Jun 2021
Project Status: Completed
Scope: Programming and
Design through Construction
Key Personnel:
Janet Tam, Principal
Initial Design Fee: $2.8M
(Full Team)
Final Design Fee: $4M
(Full Team)
Initial Construction Budget :
$24.8M (Accepted Bid $28.2M)
Final Construction Cost: $30M
Client Project Manager:
Manny Hernandez
Parks & Recreation Director
650.947.2740
[email protected]
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 04
1 1
1 8
9 10
4 5
5 6
6 7
11 12
2 2
3 3
3 4
5 6
7 3
1 2 LOBBY
ENTRANCE
ADMIN
MULTI-PURPOSE
MEETING ROOM
SENIORS
COMMUNITY ROOM
8 9
10 11
12 ARTS + CRAFTS
TEEN
MOVEMENT/DANCE
KITCHEN
KINDER PREP
0' 40'20'10'
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 05
RE-IMAGINING CIVIC ST. HELENA
Noll & Tam and WRT developed a vision study for St. Helena focused on re-imagining its civic core as a connected, resilient, and distinctly local place. By aligning streets, parks, libraries, plazas, and other shared spaces, the study outlines a path to strengthen community life while responding to real pressures such as housing needs, aging infrastructure, and long-term water stewardship.
At the heart of the effort is a commitment to local character. St. Helena’s history, scale, and agricultural roots shape how residents experience their town. Planning was approached through a values-based lens, grounding potential solutions in community priorities and long-standing traditions.
This ensured that recommendations support growth without eroding the small-town qualities that define St. Helena.
The vision also prioritizes engaging public spaces that are walkable and bikeable, inviting residents to move easily between destinations.
By improving connectivity and enhancing the public realm, the plan supports local businesses, encourages healthy activity, and creates safer, more welcoming streets.
Community engagement was central to the process. The team established a temporary downtown storefront that served as an open, visible hub for the study. Residents could walk in, meet the consultant team, review materials, share ideas, and attend presentations about the process. This accessible and transparent approach made the planning process part of everyday civic life rather than a one-time meeting. It encouraged candid conversations, built trust, and allowed the study to reflect a wide range of voices.
PROJECT INFORMATION
Client: City of St. Helena
Location: St. Helena, CA
Dates: Jul 2019 - Mar 2020
Project Status: Completed
Scope: Vision Study
Key Personnel:
Janet Tam, Principal
Tom Beil, PM
Initial Design Fee: $256K
(Full Team - Study only)
Final Design Fee: $283K
(Full Team - Study only)
Initial Construction Budget:
N/A
Final Construction Budget:
N/A
Client Project Manager:
Mark Prestwich, City Manager,
City of Hemet (formerly City
Manager, City of St. Helena)
951.593.2857
[email protected]
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 06
MARIPOSA PARK
Developed in the Mission Bay neighborhood of San Francisco, the
2.5 acre urban park provides a multi-functional outdoor space for the surrounding neighborhood to picnic, play, and relax in a rich and ecologically vibrant landscape..
Born out of extensive community dialogue, the design creates a distinctive landscape of forms and elements that celebrate the heritage of the industrial waterfront and local ecology. The story of early use of the site as a railyard is told through the design of the plaza, paths, and shade structures. A trellis made of locally salvaged timbers and steel I-beams replicate the roundhouse tracks and turntable. Where spur lines once radiated, gabion segments filled with brick, concrete, and asphalt rubble collected from nearby building demolition – trace their paths.
The gabions create a unifying language of perimeter markers, field game viewing platforms, and habitat for small fauna. Trimmed in wood, gabions in the plaza become impromptu stages and seats.
Park ecology is both meaningful and character-defining. Planting promotes biodiversity through use of extensive native species that attract bird and beneficial insects. Butterflies, as inspiration for the park’s biomorphic forms and the park’s namesake, are particularly supported.
Plant species associated with the endemic and endangered Mission Blue butterfly are included. Stormwater is managed through vegetated swales and other LID techniques.
PROJECT INFORMATION
Client: Mission Bay
Development Group
Location: San Francisco, CA
Dates: 2012-2018 with
Maintenance Assessments
Project Status: Completed
Scope: Programming,
Conceptual Design, SD, DD, CD,
Construction Period Services
Key Personnel: John Gibbs,
James Stickley
Initial Design Fee: $322K
Final Design Fee: $511K
Initial Construction: $3.04M
Final Construction: $3.11M
Client Project Manager:
Luke Stewart, Managing
Principal, 415.355.6671
lstewart@mbaydevelopment.
com
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 01
PROPOSED SCOPE OF SERVICES
PROJECT
UNDERSTANDING AND
PROJECT APPROACH
This project represents an
opportunity to transform an ideal
site into a recreation and aquatics
center that serves neighborhoods
within walking distance while
addressing citywide needs. The
City has identified strong demand
for aquatic facilities, flexible
multi use recreation space, and
upgraded sports amenities, along
with a clear commitment to
inclusive engagement and phased
decision making.
Our approach supports the
City’s goal of developing a
Council approved conceptual
plan grounded in meaningful
community input, realistic cost
alignment ($50-75M), and long
term operational stewardship.
We will guide the process from
engagement through alternatives
and phasing, helping the City
translate community priorities into
a cohesive and buildable recreation
campus that strengthens
connection, access, and daily life.
TASK 1 Project Start -Up
As prime consultant, Noll &
Tam will provide overall project
management, serving as the
primary point of contact and
coordinating the full consultant
team. Our approach emphasizes
clear communication, defined
roles, and disciplined schedule
management from the outset.
We envision the June 1 kick off
meeting as a working partnering
session with City staff and key
members of the Phase I team,
including Noll & Tam, WRT, and
Contigo Communications. This
meeting will confirm the Phase I
scope, refine the project schedule,
and establish decision making
protocols. It will also provide an
opportunity to better understand
the City’s vision, priorities,
and expectations, identify key
stakeholders, and align our work
with previous planning efforts.
This early alignment will set a
clear foundation for engagement,
alternatives development, and
phased conceptual planning.
AGE WELL CENTER
PHASE 1 SERVICES
Phase I is the foundation of the
entire project. It establishes
the roadmap, defines program
priorities, tests site opportunities
and constraints, and sets realistic
budget and phasing expectations
that will guide all subsequent
design and construction decisions.
This phase is where community
priorities are translated into
clear direction and where
alternatives are evaluated against
cost, operations, and long term
stewardship.
In this phase, we will lead a
structured process that integrates
community engagement, site
analysis, and design exploration
to produce a Council approved
phased conceptual plan. Through
disciplined coordination and
transparent decision making,
Phase I will align aspiration with
feasibility, providing the City with
a clear and defensible framework
for advancing into detailed design
and implementation.
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 02
Key objectives for
Task 1 include:
• Setting up communication
protocols and validate the
proposed schedule, key
dates for public meetings
and deliverables.
• An initial site visit with city
staff June 8th. This walk
thru will allow our entire
team to confirm existing
conditions and constraints.
• Following the site visit on
June 8th, we suggest an
initial space programming
meeting with city staff to
draft a wish list of space
program uses that may
want to be considered for
community input based on
city staff experience and
community input to date.
• Identification of key
stakeholder individuals and
groups (10-15) including
possible target populations
that may be hard-to-
reach and plan for CBO
engagement and the use of
incentives.
• Co-develop the Community
Engagement Plan, public
materials, and culturally
responsive strategies to
comprehensively capture
community feedback on
programming options and
recommended recreational
facilities. Build upon
outreach and engagement
process to date. This will be
the roadmap for Phase 1.
NORTH BERKELEY SENIOR CENTER
Project Management:
Schedule and Budget
Every successful project in the
public realm is dependent on
good project management,
planning and communication
to smoothly maneuver through
the complexities of the public
process: partnering with multiple
client agencies and departments,
presenting to city councils and
commissions, engaging diverse
stakeholders and user groups, and
coordinating large design teams
of consultants, so that effective
decisions can be made and the
project progresses forward on
schedule and on budget.
Our project scope includes a
level of project management that
includes weekly check-in client
meetings during tasks 1, 2, and
3, then bimonthly meetings for
tasks 4 & 5. Jocelyn Lawrence
Barish, NT project manager will be
attending all check-in meetings,
typically with another NT team
member as appropriate.
Our detailed project schedule for
Phase 1 on the next page aligns
with key dates as noted in the RFP.
LOS ALTOS COMMUNITY CENTER
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER
Review Existing Documentation
Site Visit and Field Verifications
Identify stakeholders
Prepare Initial Rec Program Options with staff
Final Community Engagement Plan - mid July
Task 1: Start Up - 1.5 Month
Task 2A/B: Gathering Input/Community Engagement - 3.5 Months Task 3: Design Alternatives and Preferred Design – 6 Months June to July 2026
July to mid Oct 2026
mid Oct 2026 to April 2027
May to September 2027
2A: Staff Interviews
2A: Stakeholder Meetings (in person & virtual) - July to Sept 2A: Community Town Halls - Aug to Sept (8/18, 8/26, 9/2, 9/3) 2A: Pop-Ups - July to Sept
2A-Discuss Community Input results and program recommendations 2B: Topographical Survey
2A: Community Engagement Summary Report and Recommendations Complete - mid October Design Charrette with staff - brainstorm concept options - Narrow to (2) design concepts Develop (2) Site & Facility Design Alternatives with pros/cons Prepare ROM Cost Model for (2) Design Alternatives
Initial Environmental Considerations for (2) Design Alternatives Community Engagement: Present Design Alternatives
Community Town Halls - end of Jan - end of Feb
Online Voting Survey
Approve Modified Preferred Design Alternative - end of April Task 4: Draft Conceptual Design - 5 Months
Develop Final Concept Site & Facility Design Drawing package Prepare Concept Cost Estimate for final concept design
Prepare Operational & Life Cycle Financial Study
Prepare Traffic Study
Develop Phasing Strategy
Prepare Phased Conceptual Design Package for approval. Incorporate city comments - end of September Task 5: Final Phased Design - 2 Months
October to November 2027
Final Phased Concept Cost Estimate update
Council meeting - Present final phased conceptual design for acceptanc e - end of October Determine CEQA scope - prepare proposal
Final Phase 1 Deliverables completion:
Conceptual Design Documents and supporting studies - end of November 2027 = Milestones
PHASE I SCHEDULE
MILESTONES, SUBTASKS & DELIVERABLES
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 04
TASK 2A Preliminary
Community Engagement
We understand that the City
of Napa seeks an inclusive,
consensus-driven planning
process to support the
development of your New Public
Recreation & Aquatics Center
that addresses multiple citywide
recreational needs for Napa’s
diverse and growing community.
We recognize that one of the key
challenges will be maintaining
alignment and momentum
across multiple stakeholders and
engagement tracks, including
residents and City partners. We
will address this by establishing
a clear work plan, consistent
communication protocols, and
flexible engagement formats that
meet partners where they are.
The first set of engagement
town hall meetings will focus on
establishing a project vision and
setting space program priorities.
This task includes the full
spectrum of engagement venues
listed in the RFP- from Town Hall
meetings, both in person and
virtual, to pop ups and smaller
stakeholder focus groups.
Contigo will lead these public
town hall sessions in collaboration
with N&T, Ballard King, and WRT
who will also be in attendance.
We anticipate that Contigo will
provide consistent participation
throughout the design process.
Noll & Tam will lead the Council
Town Hall presentation with
Contigo’s support.
For effective communication
and engagement with diverse
populations, our team will employ
the following key steps and tactics:
• Empower community members
by providing clear, accessible
information about the Project
and opportunities to share
input that will directly inform
recommended recreational
facilities and programming.
• Tailor Community Engagement
by working closely with
City staff, stakeholders,
and community-based
organizations to understand
local priorities, needs and local
best practices.
• Gather information through
interest forms, virtual and
in-person, and in-language,
stakeholder meetings to ensure
project outcomes align with
Napa’s community context and
needs. We recognize that we
have to meet people where
they are, particularly given the
recent increase in ICE raids,
and work with local trusted
partners.
• Create working partnerships
with community-serving
organizations (CBOs),
neighborhood groups, and
key stakeholders to maximize
participation. By working with
trusted local CBOs we will aim
to effectively and efficiently
engage residents, especially
hard to reach groups. Maintain
a transparent and productive
two-way communications
program that places public
participation at the forefront
at all phases of the design and
construction process so that
the community continues to
support the project progress.
HALF MOON BAY
LIBRARY
COMMUNITY MEETINGS
5 MEETINGS IN SEPTEMBER 2015
HALF MOON BAY
DATE TIME LOCATION
9/13 1:30-3PM TED ADCOCK COMMUNITY CENTER
535 KELLY AVENUE, HALF MOON BAY
9/15 7:30-9PM LA HONDA - PESCADERO
UNIFIED SCHOOL DISTRICT
BOARD ROOM
360 BUTANO CUT OFF , PESCADERO
9/16 6:30-8PM FARALLONE VIEW ELEMENTARY SCHOOL
1100 LE CONTE AVENUE, MONTARA
9/17 6:30-8PM HALF MOON BAY LIBRARY
620 CORREAS STREET, HALF MOON BAY
9/29 6:30-8PM TED ADCOCK COMMUNITY CENTER
535 KELLY AVENUE, HALF MOON BAY
COME SHARE YOUR IDEAS FOR THE NEW LIBRARY!
This meeting will be
conducted bilingually
in English/Spanish
This meeting will be
conducted bilingually
in English/Spanish
This meeting will be
conducted bilingually
in English/Spanish
This meeting will be
conducted bilingually
in English/Spanish
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 05
The values underpinning our
engagement approach are:
• Cultural Competence &
Language Access: This
involves understanding the
values, beliefs, and behaviors
of different cultures and
incorporating them into
communication strategies.
It also involves respecting
cultural differences, avoiding
cultural stereotypes, and
addressing language barriers
by providing translation and
interpretation services for non-
English speakers. By improving
access, we make achieve
equitable outcomes and correct
past inequities.
• Equity-Based Approach: Not
all communities have the same
level of access to information
and resources. We prioritize
the needs of marginalized
communities and ensures that
they have equal access to
information and opportunities
for engagement. It also means
using meeting incentives when
possible and appropriate. We
provide information bilingually
and provide non-digital
versions of any digital tools.
We factor in literacy level in
the drafting of all our written
materials, so they are as
accessible as possible to a wide
audience.
• Listening Sessions: Based
on the 2025 Engagement
Initiative results and additional
background information
provided by the City, we will
implement an array of outreach
approaches designed to gather
input in various formats,
including the use of a digital
and hard-copy surveys. All
engagement will be designed
to inform programming options
based on community needs
and desires. Intentional focus
groups will be proposed with
specific demographic groups
that may be hard to reach, such
as teens, disabled, elderly and
non-English speakers.
• We will deliver flyers to the
list of CBOs and City agencies
identified as critical for
success, and follow up with
reminder emails and/or calls
prior to each meeting. Our
high-touch outreach delivers
good engagement outcomes
because it builds trust and
demonstrates our sincere
desire to hear from everyone.
Task 2A Milestones and
Deliverables
• Up to 10 City staff interviews
(N&T led with WRT/B*K)
• Aug 18th City Council
Town Hall (N&T led with
WRT/Contigo)
• (1) Town Hall presentation,
with translator (Contigo led
with N&T/WRT/B*K)
• (1) Spanish-language Town
Hall (Contigo led)
• (3) in person stakeholder
groups sessions on same day.
(Contigo and N&T co-led)
• (5-10) virtual sessions.
(Contigo and N&T co-led)
• (3-5) community pop-ups
(Contigo led with N&T)
• Online Voting Survey
(Contigo led)
• Final Community
Engagement Summary
Report (Contigo led with
N&T/WRT/B*K)
YMCA TEEN CENTER
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 06
TASK 2B Topographic Survey
Overlapping the engagement
process, the survey of the property
will be completed for a reliable
drawing background for concept
design tasks. Information as noted
in the RFP will be included. This
task will be completed by Cinquini,
managed and coordinated by N&T
with the city’s input.
TASK 3 Concept Design
Alternative
Noll & Tam and WRT will closely
collaborate on concept site and
building design alternates for the
entire 26-acre site. Our designs
will grow out of our task 2A
community engagement listening
and inquiry process, firsthand
feedback from city staff, our
understanding and analysis of the
existing site and building context,
and Napa’s vision and care for the
quality of life for its residents.
This task will focus on the
physical constraints and potential
of the site, environmental
considerations, and how the
site should be shaped to have
the most synergistic impact
to proximate neighborhoods,
but also to Napa as a whole. It
will balance practicalities with
the aspirational. Engineers will
weigh in on the proposed gym
building renovations and potential
additions for cost estimating.
The designs will respond to the
space program priorities that are
established in Task 2A and how we
can find creative synergy between
flexible, multi-functional, multi-
generational spaces intended to
be inviting to all residents of Napa.
The 2nd set of engagement
sessions, which include a city
council work session and (2)
Town hall meetings, will occur in
task 3 and will focus on alternate
concept site and recreation
building designs. Pros and
cons will be evaluated, perhaps
other variations discussed, and
the community will have the
opportunity to weigh in. Noll &
Tam will lead these public sessions
with WRT and Contigo.
The objective at the end of
task 3 is to recommend one
concept design vetted by the
community and approved by
council. The selected alternative
will likely require modifications
that respond to council, city staff,
and community input that will be
studied and incorporated into a
final design option at Task 4 & 5,
the end of Phase 1.
ESTUARY PARK, OAKLAND (WRT)
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 07
As designers, we are naturally
energized by the potential of the
Harvest Middle School site and
have begun exploring how its size,
location, and existing features
might support a future recreation
and aquatics center. With the
limited information currently
available, we have prepared
a few preliminary sketches to
illustrate how we think through
site organization and program
relationships.
These ideas are intentionally
exploratory. We do not approach
a new project with fixed priorities
or preconceived solutions.
Phase I is about listening first,
understanding community goals,
and testing alternatives against
real constraints. The sketches
included here are simply examples
of how Task 3 design alternatives
might be communicated. We
find that early visual studies can
help translate complex ideas into
accessible discussions, serving as
catalysts for dialogue and helping
the community and City staff
better understand opportunities,
tradeoffs, and site potential.
Also, it was fun to quickly ideate
with our team and imagine what
this site could become!
Some questions we asked
ourselves when we worked on
these sketches included:
• How should passive
gathering areas balance with
programmed sports facilities?
• What should the relationship
be with the elements and
adjacent neighborhoods?
• How might the future housing
component complement and
benefit from shared open space
and amenities?
• What local cultural or
environmental themes could
inform a distinctive identity for
the project?
• How can phased development
contribute to Napa’s long
term goals for sustainability,
wellness, and civic vitality?
HOUSING
ELLIPSE
POOL
COURTS
PARK
PARK
PARK
HOUSING
HOUSING
COURTS
COURTS
ARRIVE ARRIVE
ARRIVE
POOL - ELLIPSE EYES ON THE PARK COMMUNITY HUB
POOL
POOL
CONCEPT DIAGRAM SKETCH IDEAS
EYES ON THE PARK:
Activate the park with housing.
Integrate access streets, building
frontages, porches and balcones
with neighborhood park feel
components. One alternative
scheme should explore a more
integrated approach.
COOL PARK/RESILIENCE HUB:
Create a welcoming destination
to mitigate the heat. The park
can include mature tree planting
for shade and fog features for
localized cooling. Buildings can
be outfitted as indoor cooling
centers with resilient systems.
COMMUNITY HUB:
Integrate local neighborhood
serving park amenities and
well-scaled people spaces into
the larger fabric of a community
park. New Recreation and
Aquatics Center becomes the
focal point of the hub.
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 08
Design Opportunities and
Considerations
As part of Task 3, we will
explore design alternatives that
respond to both the physical
characteristics of the site and
the City’s broader goals. The
following are opportunities and
considerations that will help shape
the alternatives.
Site Organization and
Placemaking
• Establishing a clear sense of
arrival and orientation for both
pedestrians and vehicles
• Creating synergy between
recreation and community
uses, indoors and outdoors
• Responding thoughtfully to
sun, wind, and climate
• Organizing zones of activity
across the site, including
coordination with the future 2.5
acre housing area
• Integrating fire access, service
circulation, and traffic flow
without diminishing the
user experience
• Strengthening connections
to surrounding residential
neighborhoods
Landscape and Outdoor
Experience
The landscape strategy will be
central to shaping the identity
and functionality of the site. Key
considerations include:
• Welcoming gathering spaces
for informal use
• Well organized athletic fields
and sports courts
• Gardens and shaded areas for
rest and reflection
• Clear pedestrian circulation and
wayfinding
• Efficient parking layout
integrated into the overall site
• Significant planting and tree
canopy to provide shade and
reinforce Napa’s character
The existing site is expansive
and relatively flat, offering long
sightlines. While this openness
supported school supervision, it
presents an opportunity to create
a more layered and engaging
landscape. Napa’s history of
orchards and tree lined parks
suggests a design approach that
introduces shade, texture, and
a sense of discovery through
carefully placed planting, gathering
spaces, and activity zones.
Task 3 Milestones and
Deliverables
• (2) concept design
alternatives for presentation
and cost estimating.
• Materials include
diagrammatic site and floor
plans, pro and con evaluation,
engineering consultant brief
descriptions for proposed
new work.
• Concept cost estimates for
both design alternates that
will be available as part of
the information presented to
council and the community
for comparison.
• Initial zoning and building
code and other relevant
agency assessments.
• LSA will prepare a
preliminary assessment of
potential environmental
considerations associated
with the Task 3 concept
design alternatives. This
early review will identify
key issues, constraints,
and opportunities that
may influence alternative
selection and phasing.
• Environmental Technical
Memorandum: LSA will
summarize initial findings
and recommend the
appropriate level of CEQA
review, such as a Categorical
Exemption, Mitigated
Negative Declaration, or
Environmental Impact
Report.
• Formal CEQA is not included
in this phase and will be
scoped and authorized
once a preferred project
alternative is defined
MARIPOSA PARK (WRT)
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 09
TASK 4 Develop Preferred
Concept Design Alternative
With the selection of the Task
3 preferred alternative, the site
and building design can be
further developed and additional
site studies specific to the
selected design alternative can
move forward. The scope and
deliverables for Task 4:
• Finalized draft
conceptual design
• Development of preferred
site and building design to
include design modification
that incorporate all feedback.
Included is architectural
plans (produced in REVIT),
elevations, sections and 3D
renderings, civil engineering
site plans, illustrative site
landscape plan, and updated
engineering narratives for
cost estimating.
• Refine opinion of cost for
developed design (TBD)
• Operational and lifecycle
financial study (B*K)
• Traffic study (LSA)
• Phasing Strategy (led by N&T
w/WRT, TBD in collaboration
with city)
TASK 5 Prepare Final Phased
Concept Design For Approval
The goal of Task 5 is to conclude
Phase 1 with a final phased
concept design that will be
approved by council and ready
to proceed to Phase II design
development and documentation
for agency permitting and
construction bidding.
• Final Deliverable and
presentation materials will be
ready for council approval and
community viewing at the end
of Task 5. Final cost estimate
will updated to represent a
phased construction strategy.
• Review City’s Community
Development Dept. and the
city’s entitlement/permitting
process and meet to discuss
next steps for Phase II.
(led by N&T)
• Coordinate with LSA’s initial
assessment of the CEQA
process. (see Task 3 milestones
and deliverables)
• Final presentation of the
phased concept design to city
council for approval (N&T/
WRT presenting)
Task 3 Milestones and
Deliverables (cont.)
• Public presentations
and facilitation of (1) city
council work session and
(2) Town Hall design
focused meetings (NT led
with WRT and Contigo
attending)
• (3-5) community pop ups
(NT led/ WRT and Contigo
attending)
• On-line voting survey
(Contigo led with NT)
• Documentation of public
input and survey results
(Contigo/ NT review)
URBAN TILTH
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 10
PHASE II SERVICES
Phase II advances the Council
approved conceptual plan into
fully coordinated, permit ready
construction documents. During
this phase, we refine design intent,
confirm systems integration, align
scope with budget, and prepare
the project for competitive bidding
and regulatory approval. Task
and phase durations noted are
estimates.
TASK 1 Schematic Design
(3 months)
Building on the approved
conceptual plan, we develop
the next level of design for
the community recreation and
aquatics center. Floor plans,
elevations, sections, and updated
site layouts are prepared to clearly
communicate the evolving design.
Key materials, systems, and
performance goals are identified,
and a detailed cost estimate is
prepared to confirm continued
alignment with the approved
budget and phasing strategy.
TASK 2 Design Development
(5 months)
During Design Development, we
refine the architectural, structural,
civil, and building systems design
to a higher level of specificity.
Material selections, accessibility
details, life safety systems, and
sustainability strategies are
defined. Updated cost estimates
are prepared to validate scope
and identify any necessary
adjustments. This phase results
in a coordinated design ready for
detailed documentation.
TASK 3 Construction
Documents (6 months)
Construction Documents
include complete architectural
and engineering drawings,
technical specifications, and
required calculations suitable for
permitting and bidding. At agreed
completion milestones, progress
document sets can be provided
for City review and comment. Cost
estimates are prepared at these
milestones to ensure the project
remains within budget. Revisions
are incorporated as needed,
including the definition of bidding
alternates, to support competitive
pricing and budget control. We
then prepare a final documents
package for Building Department
review and permit approval.
TASK 4 Regulatory Permitting
(3-4 months)
We prepare and submit required
permit documents to the Building
Department and other regulatory
agencies, coordinating responses
to plan check comments and
facilitating timely approvals. This
includes coordination related
to aquatic health requirements,
accessibility compliance, and other
jurisdictional approvals. We work
closely with City staff to support
entitlement and permitting
processes as required.
TASK 5 Bidding Support
(2 months)
We provide bid ready Construction
Documents with all permit
comments incorporated. Our team
attends the pre bid conference,
responds to bidder questions, and
issues addenda and clarifications
as required. At the conclusion of
bidding, we provide a conformed
set of Contract Documents
reflecting all addendum items.
We assist the City in evaluating
bids and reviewing substitutions
to support a fair and competitive
procurement process.
PHASE III SERVICES
(20-24 MONTHS)
Phase III supports construction
through completion and project
acceptance, ensuring that the built
work reflects the approved design
intent and performance standards.
TASK 1 Construction
Administration
During construction, we work
closely with the contractor and
the City’s construction manager
to ensure that the design intent
is implemented and project
requirements are met. We review
submittals, respond to requests for
information, evaluate change order
proposals, and conduct regular site
observations. We maintain logs of
RFIs, submittals, and changes, and
provide meeting documentation
as required. Our mechanical,
electrical, and plumbing engineers
support systems review and
coordination.
TASK 2 Project Close Out
At project completion, we
participate in final inspections and
prepare punch lists. We review
as built drawings, operations
and maintenance manuals, and
commissioning documentation. We
assist the City in obtaining final
approvals and project acceptance,
and provide finalized record
documents in required formats.
Our goal is to ensure a smooth
transition from construction to
occupancy, with building systems
operating as intended and staff
prepared for long term operations.
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 01
PROJECT TASKS BY PERSONNEL
Firm Team Member Title Task 1 Task 2A Task 2B Task 3 Task 4 Task 5 TOTAL Noll & Tam Janet Tam Principal in Charge 32 71 98 31 17 249 Jocelyn Lawrence Barish Project Manager 65 181 3 230 153 56 688 Ned Reifenstein Project Archictect/Planner 2 10 45 30 10 97 Tom Beil Project Designer 14 12 95 69 2 192
Intermediate Architect Intermediate Architect 40 78 222 137 24 501 Graphic Designer Graphic Designer 8 12 42 8 70
161 364 3 732 428 109 1797
ADG Dennis Berkshire Principal in Charge 4 65 12 8 8 97 Justin Caron Aquatics Principal Architect 0
Alejandro Pinnick Aquatics Project Designer 8 8 4 2 22
Greg Ferrell Aquatics Project Principal 1 2 1 1 5
4 74 22 13 11 124
Ballard*King Darin Barr President 25 8 8 30 71
Scott Caron Senior Associate 30 40 70
55 8 8 70 141
Cinquini &
Passarino Mark P. Andrilla
Primary Contact/Project
Manager 12 12
Anthony G. Cinquini
Principal Contact/Quality
Assurance 1 1
Party Chief 32 32
Chainman 32 32
Survey Technician III 30 30
107 107
Contigo Susana Razo Principal 13 54 18.5 85.50
Milton Reynolds Facilitator 13 5.25 18.25
Drew Guenzer Project Manager 10 67.5 29 106.50
Associate Associate 4 41.5 28.7 74.20
27 176 81.45 284.45
CSWST2 Kirk Bovitz Project Manager 8 16 16 8 48
Rich Souza Principal 4 4 4 4 16
Engineer 1 Engineer 1 4 40 24 16 84
Engineer 2 Engineer 2 12 32 24 16 84
28 92 68 44 232
Subtotal
Subtotal
Subtotal
Subtotal
Subtotal
Subtotal
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 02
Firm Team Member Title Task 1 Task 2A Task 2B Task 3 Task 4 Task 5 TOTAL KPFF Sylvia Petta Principal 16 24 8 2 50
Michaela Nava Project Manager 20 24 16 4 64
Engineer 20 20
36 68 24 6 134
LSA Theresa Wallace Principal in Charge 2 2
Shanna Guiler Project Manager 8 4 12
Arthur Black
Principal/Transportation
Planner 24 24
Assistant Environmental
Planner
Assistant Environmental
Planner 16 16
Transportation Modeler Transportation Modeler 56 56
Transportation Planner Transportation Planner 48 48
Assistant Transportation
Planner
Assistant Transportation
Planner 80 80
GIS/Graphics GIS/Graphics 4 4Word
Processor/Technical
Editor
Word Processor/Technical
Editor 2 2
32 212 244
OMM Pieter Colenbrander
Principal, Electrical
Engineering 10 24 8 42
David Orgish Principal, Lighting Design 5 10 3 18
15 34 11 60
Taylor Engineers David Heinzerling Principal 8 4 2 0 14 Laura Van Rietema Senior Engineer 10 8 2 1 21
Dan Siqueira Senior Plumbing Designer 18 10 3 1 32
36 22 7 2 67
TBD Andy Beyer Principal Estimator 2 5 5 2 14
Kathryn DeFay Sr. Cost Estimator 12 87 78 14 191
David Jones
Director of MEP Consulting
Services 7 11 1 19
Eunice Ko Cost Estimator 24 10 34
Scheduler (Optional
Service)
Scheduler (Optional
Service) 32 4 36
14 99 150 31 294
RGH Eric Chase
Principal Geotechnical
Engineer, Project Manager 3 3 3 9
Jared Pratt
Principal Engineering
Geologist 2 2 1 5
Paul Burke Staff Engineer 18 18 2 38
Graphics Graphics 6 6 12
Subtotal
Subtotal
Subtotal
Subtotal
Subtotal
Firm Team Member Title Task 1 Task 2A Task 2B Task 3 Task 4 Task 5 TOTAL Report
Typing/Reproduction
Report
Typing/Reproduction 3 3 6
32 32 6 70
WRT John Gibbs Principal 14 11 28 10 4 67
Megan Dale Project Manager/Level IV 38.5 44 108 74 21 285.5 Intermediate staff Staff - Level II 16 23 101 126 8 274 Intermediate staff Staff - Level I 7 120 156 16 299
75.5 78 357 366 49 925.5
Team Totals by Task 307.5 336 139 796.45 944 160 2682.95 Subtotal
Subtotal
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 03
Firm Team Member Title Task 1 Task 2A Task 2B Task 3 Task 4 Task 5 TOTAL Report
Typing/Reproduction
Report
Typing/Reproduction 3 3 6
32 32 6 70
WRT John Gibbs Principal 14 11 28 10 4 67
Megan Dale Project Manager/Level IV 38.5 44 108 74 21 285.5 Intermediate staff Staff - Level II 16 23 101 126 8 274 Intermediate staff Staff - Level I 7 120 156 16 299
75.5 78 357 366 49 925.5
Team Totals by Task 307.5 336 139 796.45 944 160 2682.95 Subtotal
Subtotal Firm Team Member Title Task 1 Task 2A Task 2B Task 3 Task 4 Task 5 TOTAL Report
Typing/Reproduction
Report
Typing/Reproduction 3 3 6
32 32 6 70
WRT John Gibbs Principal 14 11 28 10 4 67
Megan Dale Project Manager/Level IV 38.5 44 108 74 21 285.5 Intermediate staff Staff - Level II 16 23 101 126 8 274 Intermediate staff Staff - Level I 7 120 156 16 299
75.5 78 357 366 49 925.5
Team Totals by Task 307.5 336 139 796.45 944 160 2682.95 Subtotal
Subtotal
ANTIOCH COMMUNITY CENTER
Noll & Tam Architects
New Public Recreation & Aquatics Center
Architectural Planning & Design Services Fee Proposal
22-Feb-26
Discipline
Reimbursable
Expenses Estimate
TOTAL PER
DISCIPLINE % of Fee
Hourly or Lump
Sum
Task 1 Task 2A Task 2B Task 3 Task 4 Task 5
Project Management (prime architect) 11700 32320 285 35460 29760 8740 118,265.00$ 10% LS Architectural Services 23270 46580 285 119750 58990 14890 5000 268,765.00$ 22% LS Recreational Planning 3300 9900 2200 16500 4000 35,900.00$ 3% LS Community Outreach specialist**** 7733 109885 31173 61266 210,057.00$ 18% LS Civil Engineering 1925 18150 14300 9130 43,505.00$ 4% LS Structural Engineering 8800 16500 6600 1650 33,550.00$ 3% LS Mechanical Engineering 11187 6941 2228 622 20,978.00$ 2% LS Electrical Engineering 4400 9900 3300 17,600.00$ 1% LS Geotechnical Engineering- (prelim only)** 6798 6,798.00$ 1% LS Land Surveying 23792 23,792.00$ 2% LS
Landscape Architectural Services 18678 19294 74008 69036 10736 1000 192,752.00$ 16% LS Aquatic Design (Specialty Consultant) 1078 19239 5225 3152 2789 8500 39,983.00$ 3% LS Cost Estimating 3366 26648 32978 7178 70,170.00$ 6% LS Environmental Services *** 5984 5,984.00$ 0% LS Traffic Study 43956 2475 46,431.00$
SUBTOTALS BY TASK 97,835.00$ 237,218.00$ 24,362.00$ 346,439.00$ 287,400.00$ 59,035.00$
SUBTOTAL BY PHASE
Discipline
Reimbursable
Expenses Estimate
TOTAL PER
DISCIPLINE % of Fee
Hourly or Lump
Sum
Task 1 Task 2A Task 2B Task 3 Task 4 Task 5
Construction Scheduling Planning (optional) 9328 1166 10,494.00$ 1% LS Structural Tier 1 study (optional) 11000 11,000.00$ 1% LS Waterproofing Assessment Allowance (optional) 22,000 22,000.00$ 2% LS Facility Tours (optional) 11,500 1000 12,500.00$ 1% LS Translation Services for Stakeholder Meetings (optional) $750/mtg 2,250.00$ 0% LS
Additional VE Cost Estimation if requested (optional) 4750 4,750.00$ 0% LS SUBTOTALS BY TASK -$ -$ -$ 44,500.00$ 14,078.00$ 1,166.00$
SUBTOTAL BY PHASE
GRAND TOTAL 1,197,524.00$
Notes:
0.05$ 59,744.00$
0.95$ 1,052,289.00$
ADDITIONAL PHASE I SERVICES PROPOSED BY CONSULTANT
PHASE I SERVICES
**Geotech Scope
Phase 1 scope includes a prelim report with the existing available published information and consultant's previous work in the vicinity.
Geotech drilled borings and final report is recommended to be completed in Phase 2 design. Fee range will be $32k to $54k depending on scope determined in Phase 1 ***Enviromental Services Scope:
Phase 1 includes high level review of concept design alternatives for key environmental issues and recommendation for appropriate CEQA environmental process, additional enviromental studies that might be needed for CEQA. Otherwise, No CEQA scope is included in this proposal per RFP direction. ****Community Outreach Specialist reimbursable expense includes cost of postcards and mailers, postage, printed materials, sandwich board signs as described in RFP, presentation materials for Town Halls, and participation incentives for selected community groups.
PHASE I SCOPE OF SERVICES
PHASE I SERVICES
82,241.00$ 1,134,530.00$
1,000.00$ 62,994.00$
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 01
BILLING RATES
• Rates are effective through one year from project
contract date.
• We assume a notice to proceed approximately
June 1, 2026.
• Per the Q&A, a 5% escalation would be
applied at each subsequent year of contract
anniversary date.
REIMBURSABLE EXPENSES
Reproduction, travel outside the Bay Area, renderings,
computer models, physical models, postage,
messengers, and other usual expenses will be billed at
1.15 times actual cost.
NOLL & TAM ARCHITECTS
Janet Tam $330
Jocelyn Lawrence Barish $190
Ned Reifenstein $260
Tom Beil $230
ADG
Dennis Berkshire $245
Justin Caron $225
Alejandro Pinnick $200
Greg Ferrell $245
BALLARAD*KING
Darin Barr $230
Scott Caron $205
CINQUINI & PASSARINO
Mark P. Andrilla $244
Anthony G. Cinquini $325
Party Chief $238
Chainman $136
Survey Technician III $192
CONTIGO
Susana Razo $295
Milton Reynolds $295
Drew Guenzer $200
Vanessa Aquino $125
CSWST2
Kirk Bovitz $213
Rich Souza $285
Engineer 1 $185
Engineer 2 $152
KPFF
Sylvia Petta $300
Michaela Nava $200
Project Engineer $170
Design Engineer $155
LSA
Theresa Wallace $345
Shanna Guiler $230
Arthur Black $270
Assistant Environmental Planner $120
Transportation Modeler $250
Transportation Planner $170
Assistant Transportation Planner $130
GIS/Graphics $175
Word Processor/Technical Editor $145
OMM
Pieter Colenbrander $265
David Orgish $265
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 02
RGH
Eric Chase
Jared Pratt
Paul Burke
Graphics
Report Typing/Reproduction
TAYLOR ENGINEERS
David Heinzerling $330
Laura Van Rietema $235
Dan Siqueira $235
TBD
Andy Beyer $255
David Jones $255
Eunice Ko $245
Scheduler $255
WRT
John Gibbs $300
Megan Dale $240
Poonam Narkar $300
Project Manager/Level IV $255
Staff - Level II $160
Staff - Level I $140
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 01
JOHN R. GIBBS,
ASLA, LEED AP
WRT
PRINCIPAL |
LANDSCAPE ARCHITECT
John’s work advances equitable,
climate forward design and
planning of civic spaces. He
specializes in public-realm design,
community engagement, and
campus open space networks that
support learning, movement, and
shared campus life.
RELEVANT PROJECTS
Ashland Zocalo
SFSU Student Wellness Center &
Aquatics
Richmond Civic Center
Downtown Napa Brown Street
Corridor
CALIFORNIA REGISTRATION
LA-4417
EDUCATION
University of California, Berkeley,
Master of Landscape Architecture
YEARS EXPERIENCE
30 Years Experience
26 Years with WRT
CALIFORNIA REGISTRATION
LA-5846
EDUCATION
University of Arkansas, Bachelor of
Landscape Architecture
YEARS EXPERIENCE
22 Years Experience
1 Year with WRT
EDUCATION
University of Cincinnati, Masters in
Community Planning
YEARS EXPERIENCE
26 Years Experience
11 Years with WRT
MEGAN DALE, ASLA
WRT
SENIOR ASSOCIATE |
LANDSCAPE ARCHITECT
Megan’s work spans urban
planning, public parks, waterfronts,
housing, trails, and urban forestry.
Her design approach centers
on listening to land and people,
blending creativity, stewardship,
and site-specific solutions that
support communities and the
natural environment.
RELEVANT PROJECTS
Lakeport Unified School District
Swim Center Master Plan
San Carlos Downtown Plan
Implementation (Streetscape and
Park)
POONAM NARKAR,
AICP
WRT
PRINCIPAL | PLANNER +
URBAN DESIGNER
Poonam’s work spans a wide
range of project types, many of
which focus on civic districts. She
applies her deep understanding
of multimodal transportation
and walkable communities using
intricate infill strategies that
reflect financial feasibility while
respecting community scale and
character.
RELEVANT PROJECTS
St. Helena Civic District Urban
Design
Redwood City Greater Downtown
Area Plan
San Carlos Downtown Plan
Implementation
APPENDIX
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 02
DENNIS BERKSHIRE
AQUATIC DESIGN GROUP
AQUATICS PRINCIPAL-IN-
CHARGE
Dennis has over 40 years of
experience in the aquatics
industry, with field experience
in swimming pool design,
construction, operation,
and training.
RELEVANT PROJECTS
Heather Farm Park Aquatic
Facility, Walnut Creek
The Wave @ Emerald Glen,
Dublin
EDUCATION
Business Administration, San Jose
State University
YEARS EXPERIENCE
42 Years Experience
27 Years with ADG
EDUCATION
MBA, Capella University
Bachelor of Arts, Communications,
Psychology,
Auburn University
YEARS EXPERIENCE
23 Years Experience
22 Years with ADG
CALIFORNIA REGISTRATION
Registered Architect - State of
California #C-35802
EDUCATION
BArch, New School of
Architecture and Design
YEARS EXPERIENCE
18 Years Experience
18 Years with ADG
JUSTIN CARON, MBA
AQUATIC DESIGN GROUP
AQUATICS PROJECT
PRINCIPAL
Since 2005, he has personally
managed over 800 aquatics
projects, spoken at over 100
industry events, and written
or been featured in over 75
publications and podcasts.
RELEVANT PROJECTS
Cordova Community Pools,
Rancho Cordova
Elk Grove Aquatic Center,
Elk Grove
GREG FERRELL, AIA
AQUATIC DESIGN GROUP
AQUATICS PRINCIPAL
ARCHITECT
Greg is a registered architect
with more than 750 completed
aquatic projects. He is responsible
for production and execution of
the overall design process, from
concept to completion.
RELEVANT PROJECTS
North Natomas Aquatic Center,
Sacramento
Rengstorff Park Pools
Replacement, Mountain View
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 03
DARIN BARR
BALLARD*KING &
ASSOCIATES
PRESIDENT
Since joining B*K in 2007, Darin
has led master plans, feasibility
studies, and operational
assessments for clients
nationwide. His passion for parks
and recreation drives his ability
to support agencies across the
country. Darin takes a multi-
layered approach, engaging
diverse stakeholders and helping
clients use data and public input
to distinguish needs from wants.
RELEVANT PROJECTS
City of Davis Aquatics Operational
Assessment & Management Review
Davis High School STEM Building &
Aquatic Center Study
El Corazon Pool Operations Review
Manteca Aquatic, Community
Center, Sports Field Feasibility Study
EDUCATION
State University of New York,
Brockport, Master of Arts in Public
Administration
University of Missouri, Bachelor
of Science in Parks, Recreation &
Tourism
YEARS EXPERIENCE
29 Years Experience
19 Years with Ballard King
SCOTT CARON
BALLARD*KING &
ASSOCIATES
SENIOR ASSOCIATE
As a former Parks and Recreation
Director, Scott managed over $50
million in projects and oversaw
both indoor and outdoor facilities.
He brings a strong focus on
practical, flexible, data-driven
planning to his consulting work.
At B*K, he guides clients through
master plans, feasibility studies,
and operational assessments using
clear analysis and stakeholder
insight.
RELEVANT PROJECTS
Chico CARD Aquatic Center
Feasibility Study
Escondido GDP Aquatic Center
Operation Study
Pico Rivera Smith Park Aquatic
Center
Davis High School Operation Plan
EDUCATION
University of Missouri, Bachelor
Of Science, Parks, Recreation &
Tourism
Certified Parks & Recreation
Professional
YEARS EXPERIENCE
31 Years Experience
7 Years with Ballard King
MARK P. ANDRILLA,
P.E., P.L.S.
CINQUINI & PASSARINO,
INC.
PROJECT MANAGER
Mark will serve as the project
manager, leveraging expertise
in municipal surveying and
engineering to deliver precise and
efficient project solutions.
RELEVANT PROJECTS
ALTA Survey & Record of Survey,
Harvest Middle School, Napa
Boundary Survey, Record of
Survey, Highway Right-of-Way
Determination- 5 Way intersection,
Napa
CALIFORNIA REGISTRATION
Civil Engineer (C51317),
Land Surveyor (L8985)
EDUCATION
B.S. Civil Engineering, UC Irvine
M.S. Civil Engineering, Stanford
University
YEARS EXPERIENCE
37 Years Experience
10 Years with Cinquini &
Passarino, Inc.
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 04
CALIFORNIA REGISTRATION
Civil Engineer (C62341),
Land Surveyor (L8614)
EDUCATION
B.S., Civil Engineering, California
State University, Chico
YEARS EXPERIENCE
28 Years Experience
20 Years with Cinquini &
Passarino, Inc.
ANTHONY G.
CINQUINI, P.E., P.L.S.
CINQUINI & PASSARINO,
INC.
QUALITY ASSURANCE
Tony will oversee quality
assurance, applying his expertise
in surveying and engineering
to ensure accurate and well-
coordinated project execution
RELEVANT PROJECTS
Boundary & Topographic Survey
Piedmont Aquatic Center,
Piedmont
Honeybee Pool Topographic
Survey, Rohnert Park
Oakmont Recreation Center Pool
Area, Santa Rosa
KIRK BOVITZ, PE
CSWST2
PROJECT MANAGER
Kirk has 35 years of experience
managing public and education
projects, with expertise in site
design, utilities, DSA coordination,
and construction support.
RELEVANT PROJECTS
Monarch Landing, City of Napa
On-Call
Browns Valley, City of Napa On-Call
Ignacio Boulevard Bus Stops and
Roadway Improvements, Novato
Highway 101/Redwood Landfill
Overcrossing, Novato
Ignacio Boulevard / Highway 101
Interchange Improvements, Novato
CALIFORNIA REGISTRATION
No. 74631
EDUCATION
B.S. Civil Engineering, California
State University, Chico
YEARS EXPERIENCE
35 Years total experience
31 Years with CSWST2
CALIFORNIA REGISTRATION
No. 67892
QSD/QSP Certificate No. 01207
EDUCATION
B.S. Civil and Environmental
Engineering, University of
California, Davis
YEARS EXPERIENCE
29 Years experience
25 Years with CSWST2
RICH SOUZA, PE, QSD/
QSP
CSWST2
PRINCIPAL
Rich has 29 years of experience,
including project management
for public and private clients, with
expertise in roadway and trail
design, utilities, drainage, and
construction coordination.
RELEVANT PROJECTS
Hunters Point Shipyard Community
Center, San Francisco
Point Molate Plan Review,
Richmond
Ned’s Way Joint Recreation Facility
Modernization, Tiburon
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 05
SUSANA RAZO, MPA
CONTIGO
COMMUNICATIONS
PRINCIPAL
Ms. Razo has spent her career
in community and stakeholder
engagement, including over
15 years in consulting. She
specializes in facilitating inclusive
engagement on complex projects
ranging from school planning and
mixed-use development to utility
infrastructure, environmental
remediation (including CEQA),
strategic planning, and racial
equity initiatives.
RELEVANT PROJECTS
SF Public Library Strategic Plan
SF Public Bank, Redwood City
Public Library Conceptual Design
Planning
Contra Costa County Bay
Point Library
MILTON
REYNOLDS, BA
CONTIGO
COMMUNICATIONS
FACILITATOR
Mr. Reynolds has over 30 years
of experience in diversity, equity,
and inclusion. With a foundation
in critical race theory and strong
pedagogical expertise, he designs
learning experiences that improve
communication across differences
and drive lasting,
transformative action.
RELEVANT PROJECTS
San Francisco Public Library,
Facilitator
Richmond Main Public Library
Modernization, Facilitator
Bay Point Public Library, Facilitator
Redwood City Public Library,
Facilitator
Oakland Unified School District,
Facilitator
DREW GUENZER, MA
CONTIGO
COMMUNICATIONS
PROJECT MANAGER
Drew brings strong skills in project
management, copywriting, editing,
research, and report development.
He quickly identifies client needs
and target audiences, tailoring
clear, accessible messaging and
engagement strategies. Organized
and collaborative, he works well
across disciplines to support
smooth coordination and workflow.
RELEVANT PROJECTS
SFMTA Safe Routes to School,
Editor & Project Manager
City of East Palo Alto, Project
Manager
Richmond Public Library, Project
Manager & Analyst
EDUCATION
Masters, Public Administration,
New York University
YEARS EXPERIENCE
15 Years Experience
8 Years with Contigo
EDUCATION
Masters, Clinical Psychology,
California Institute of Integral
Studies.
Bachelor of Arts, Comparative
Literature, Yale University
YEARS EXPERIENCE
12 Years Experience
4 Years with Contigo
EDUCATION
Bachelor of Arts, Sociology,
San Jose State University
YEARS EXPERIENCE
30 Years Experience
5 Years with Contigo
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 06
SYLVIA PETTA, SE
KPFF
PRINCIPAL
Sylvia is an enthusiastic team
member and problem solver. Her
favorite projects are those that
produce beautiful yet functional
gathering spaces.
RELEVANT PROJECTS
YMCA; Redwood City
Tice Creek Fitness Center;
Walnut Creek
Mill District Amenities & Pool
Building; Healdsburg
Enso Village Pool Building;
Healdsburg
CALIFORNIA REGISTRATION
CA #S5928; CA #C74053
EDUCATION
BS, Civil Engineering, University of
Pennsylvania, Philadelphia
YEARS EXPERIENCE
21 years with KPFF
21 years total experience
CALIFORNIA REGISTRATION
CA #S7192; CA #S85755
EDUCATION
MS, Structural Engineering Santa
Clara University
YEARS EXPERIENCE
10 years with KPFF
13 years total experience
MICHAELA NAVA, SE
KPFF
PROJECT MANAGER
Since joining KPFF in 2016,
Michaela has developed an
impressive and diverse portfolio
of work including civic and
recreation projects.
RELEVANT PROJECTS
Herz Rec Center; San Francisco
The HUB Community Center;
San Francisco
UC Davis Orchard Park
Community Center; Davis
Cultural Center Renovation &
Expansion; Vacaville
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 07
ANDY BEYER
TBD CONSULTANTS
ASSOCIATE PRINCIPAL
Andrew Beyer has extensive
experience in cost estimating,
construction field management,
and structural engineering. His
well-rounded past experiences
have positioned him to provide
high value to meet and exceed his
client’s needs.
RELEVANT PROJECTS
Walnut Creek Heather Farm Park
Aquatics Facility and Community
Center
Monterey Bay Aquarium Water
Science Lab Renovation
Las Gallinas Valley Sanitary District
– Multipurpose Laboratory Building
EDUCATION
Bachelor of Science in Civil
Engineering, Washington
University, St. Louis
YEARS EXPERIENCE
9 Years with TBD
30 Years of Experience
KATHRYN DEFAY
TBD CONSULTANTS
SENIOR COST
ESTIMATOR
With over 20 years of experience
as a Project Manager and in the
construction industry, Kathryn
prepares detailed cost estimates,
manages quantity takeoffs,
coordinates vendor bids, and
ensures projects stay on budget
and schedule while identifying
cost-saving opportunities.
RELEVANT PROJECTS
Tracy Aquatic center
San Jose/Evergreen Community
College District Facilities Master
Plan Update
Heather Farms Aquatics &
Community Center
WCALIFORNIA REGISTRATION
ASPE, American Society of
Professional Estimators
EDUCATION
University of California, Davis
YEARS EXPERIENCE
25 Years Experience
4 Years with TBD
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 08
SHANNA GUILER,
AICP
LSA
PROJECT MANAGER
Ms. Guiler is an urban and
environmental planner with
experience in parks and open space
planning, resource management,
and environmental analysis.
RELEVANT PROJECTS
Napa County, Napa Valley
Vine Trail
City of Walnut Creek, New Aquatic
and Community Center at Heather
Farm Park
City of Tracy, El Pescadero Park
& Multi-Generational Recreation
Center Project
EDUCATION
M.U.E.P., Urban and Environmental
Planning, University of Virginia,
Charlottesville
B.A., Physics, University of California,
Los Angeles
YEARS EXPERIENCE
25 Years Experience
22 Years with LSA
EDUCATION
Masters of Urban and Regional
Planning, California State
Polytechnic University, Pomona
B.S., Industrial Management, Grove
City College, Pennsylvania
YEARS EXPERIENCE
19 Years Experience
19 Years with LSA
EDUCATION
B.A, Environmental Studies,
University of California, Santa Cruz
YEARS EXPERIENCE
23 Years Experience
21 Years with LSA
THERESA WALLACE,
AICP
LSA
PRINCIPAL IN CHARGE
As Principal in Charge, Ms. Wallace
oversees both individual and
on-call CEQA contracts. She is
ultimately responsible for ensuring
that LSA’s products are completed
to the highest quality standard and
meet the requirements of the client.
RELEVANT PROJECTS
Napa County Health and Human
Services Agency Campus Focused
EIR and Initial Study
San Bruno Recreation and Aquatic
Center Project EIR
ARTHUR BLACK
LSA
PRINCIPAL/
TRANSPORTATION
PLANNER
As Transportation Principal, Mr.
Black’s primary responsibilities
include the production of technical
reports for the transportation
function of LSA’s projects, including
the preparation of traffic and
parking studies, operational
analysis, and transportation
planning research.
RELEVANT PROJECTS
City of Tracy, El Pescadero Park
& Multi-Generational Recreation
Center Project
City of Long Beach, Belmont Pool
Revitalization Project
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 09
ERIC CHASE, GE, CE
RGH CONSULTANTS
PRINCIPAL GEOTECHNI-
CAL ENGINEER, PROJECT
MANAGER
Skilled in project coordination and
communication with design teams
and government agencies, Mr.
Chase has extensive experience
overseeing geotechnical design
and construction for public
infrastructure, including parks,
schools, pathways, roadways,
bridges, utilities, and pavement
projects.
RELEVANT PROJECTS
1500 First St Improvements, Napa
Fuller Park Playable Art, Napa
Napa Fire Station No. 5, Napa
CALIFORNIA REGISTRATION
GE 2628
CE 53150
EDUCATION
B.S. Civil Engineering, California
Polytechnic State University, San
Luis Obispo
YEARS EXPERIENCE
36 Years Experience
26 Years with RGH
CALIFORNIA REGISTRATION
CEG 2453
Professional Geologist 7901
EDUCATION
A.A. Natural Science, Ricks
College, Idaho
B.S., Geology, California State
University System: Sonoma State
University, Rohnert Park
YEARS EXPERIENCE
26 Years Experience
20 Years with RGH
CALIFORNIA REGISTRATION
EIT 161091
EDUCATION
B.S. Civil Engineering, California
Polytechnic State University, San
Luis Obispo
YEARS EXPERIENCE
4 Years Experience
4 Years with RGH
JARED PRATT,
CEG, PG
RGH CONSULTANTS
PRINCIPAL ENGINEERING
GEOLOGIST
With many years of geotechnical
engineering experience, Mr. Pratt
has managed capital improvement
projects for roadways, commercial
and residential development, as
well as construction inspection
and testing programs.
RELEVANT PROJECTS
250,000 Square Foot Building/
Wine Warehouse, Napa
Fuller Park Playable Art, Napa
Gray Haven Housing, Napa
PAUL BURKE, EIT
RGH CONSULTANTS
STAFF ENGINEER
Mr. Burke is responsible for
coordination and performance
of geotechnical investigations
using borings, test pits, and cone
penetrometer tests, engineering
analysis and preparation of
geotechnical study reports, and
construction observation and
testing.
RELEVANT PROJECTS
Bower Park Restoration and
Improvement, Gualala
Cobb Community Park, Cobb,
Lake County
Knoll House Pedestrian
Bridge, Napa
NOLL & TAM ARCHITECTS
NAPA NEW PUBLIC RECREATION AND AQUATICS CENTER 10
DAVID
HEINZERLING, PE
TAYLOR ENGINEERS
PRINCIPAL
David will lead mechanical design
for the project, bringing deep
expertise in HVAC and building
science to support comfortable,
efficient, high-performing spaces.
RELEVANT PROJECTS
Menlo School Spieker Center
East Palo Alto Youth Arts and
Music Center
Diablo Valley College Engineering
Technology
Adobe North Tower
CALIFORNIA REGISTRATION
Mechanical Engineer, California
#38064
EDUCATION
B.S. Civil Engineering, B.A. Plan II,
The University of Texas, Austin
M.S. Architecture, Building Science,
University of California Berkeley,
YEARS EXPERIENCE
15 Years Experience
12 Years with Taylor Engineers
CALIFORNIA REGISTRATION
Mechanical Engineer, California
#42155
EDUCATION
B.S. Mechanical Engineering,
Calvin University
YEARS EXPERIENCE
8 Years Experience
5 Years with Taylor Engineers
EDUCATION
B.S. Biomedical Engineering,
Georgia Institute of Technology
YEARS EXPERIENCE
11 Years Experience
LAURA
VAN RIETEMA
TAYLOR ENGINEERS
SENIOR ENGINEER
Laura brings expertise in HVAC
design, commissioning, and energy
analysis, applying sustainable and
efficient strategies to deliver high-
performing building systems that
enhance comfort, reduce energy
use, and support the communities
they serve.
RELEVANT PROJECTS
Samuel Merrit University City
Center
Transamerica Pyramid TI
USGS Moffett Field Relocation
DAN SIQUEIRA, CPD
TAYLOR ENGINEERS
SENIOR PLUMBING
DESIGNER
Dan will lead plumbing and
fire protection design, bringing
expertise in complex, high-
performance systems and
innovative solutions to support the
project’s specialized needs.
RELEVANT PROJECTS*
Memorial Park Master Plan and
Aquatics Center, Santa Ana
Siskiyou County Courthouse
Los Medanos College Brentwood
Campus
Evergreen Valley College Student
Services Complex
Stanford Biomedical Innovations
Building