5-Way Intersection Improvements ProjectSeptember 15, 2026 PROJECT BACKGROUND5-Way Intersection Improvements Project

Traffic Operations
• Silverado Trail – State Highway• Caltrans & City partnership• Crucial Corridor• Third Street, CoombsvilleRoad, East Avenue are key local roads• 1989 General Plan• Currently operating at a poor level of service Project Need

Traffic Operations

Safety
• Collisions higher than statewide average• Corridor on High Injury Network• Lack of connected pedestrian and bicycle facilities• Local flooding and drainage issues Project Need

Project TimelineProject Timeline
2014-2015:Community OutreachPre-2014: Intersection Improvement Project Added to General Plan2016:Signal timing adjustment2017:Council selects option for further evaluation 1989:Intersection improvements identified in the General Plan2017:13 concepts narrowed down to 3 options. Council selects study alternative2019:Caltrans approves project initiation documents2024-2026:Environmental review process leading to Final Draft EIR 2014-2016:Community engagement and alternative development Community Feedback
Community Feedback
Reduce Delays
Reduce Delays
Maintain ALL Access
Maintain ALL Access
Preserve Character
Preserve Character
Do Nothing
Do Nothing
Consider Roundabouts
Consider Roundabouts
Improve Safety and Active Transport
Improve Safety and Active Transport
Options Developed

Draft Study Concepts (2017)Option 5F: dual roundabout Third Street north Option 8: dual roundabout Third Street south
Option 6: Five-leg roundabout
Draft Study Concepts (2017)
• Promote slower speeds and traffic calming• Fewer conflict points• No left turns• No rush to “beat the light” Vehicle Safety

Multi-Modal Safety
Refuge Islands:Pedestrians only cross one direction of traffic at a timeControlled Speeds:Slower vehicle movement through roundabouts Shared Path:Bikes can use the roundabout or use ramps to mount the shared use path Option 5F – Double Roundabout Third Street north
• Reduces delay at all intersections• Improves operations– LOS to A-B• Has fewest property impacts, although major Option 5F – Property Impacts

Option 6 – Single Roundabout
• Reduces delay• Improves LOS in near term• Significant property and business impacts Option 6 – Property Impacts

Option 8 – Double RoundaboutThird Street south
• Reduces delay in near term• Improves LOS in near term; unacceptable LOS in future • Significant property and business impacts Option 8 – Property Impacts

• 2017 Council recommended 5F for further study– Allows this option to be further studied – moved forward into environmental review• Caltrans approved Project Initiation Document (PID), allowing project to take next steps• Detailed environmental review of Option 5F 2017 Council Recommendation

ENVIRONMENTAL IMPACT REPORT5-Way Intersection Improvements Project EIR Process
• Initial Study – Caltrans Project Initiation Document• Notice of Preparation (NOP)• Scoping and Draft EIR Preparation• Public Review (Notice of Availability)• Final EIR (FEIR)• Findings and Certification• Notice of Determination (NOD) EIR Process
• Aesthetics• Air Quality• Biological Resources• Cultural Resources• Geology and Soils• Greenhouse Gas Emissions• Hazards and Hazardous Materials• Hydrology and Water Quality • Land Use Planning• Noise & Vibration• Population and Housing• Public Services• Transportation• Tribal Cultural Resources• Utilities and Service Systems• Wildfire Areas of Environmental Review
Noise:• The project would not result in a substantial increase in permanent ambient noise levels. • Construction noise levels would not be expected to exceed the quantitative noise limits established by CaltransVibration• The project would not result in the generation of excessive vibration during operation.• Project construction would result in vibration levels that could cause damage to existing buildings Noise and Vibration Impacts
Noise – less than significant• Construction Equipment to conform to Caltrans noise control specifications• Restrict noise generating activities to acceptable time periods• Locate noise generating equipment as far as practicable from sensitive noise receptorsVibration – less than significant with mitigation• Use "quiet" equipment technology• Avoid vibratory rollers within 25-feet of structures• Avoid dropping heavy objects within 25-feet of structures• Avoid hoe rams, large bulldozers, and caisson drilling equipment within 15-feet of structures Noise and Vibration Mitigation
• The Project would need to negotiate to acquire the property at 801 Silverado Trail and demolish the structure to construct the proposed project• The property is listed on the City’s Historic Resource Inventory (HRI) and impacting the integrity of the East Napa Historic District by removing one of its contributing properties• The impacts to 801 Silverado Trail are considered to be significant under CEQA Cultural Resources Impacts
• The East Napa Historic District will be re-evaluated for listing on the National Register of Historic Places• Recordation of 801 Silverado Trail consistent with Historic American Building Survey (HABS) standards• Napa County Landmarks will assist in salvaging materials from 801 Silverado Trail• New wayfinding signage will identify the East Napa Historic District• The City of Napa, working with Napa County Landmarks, will develop a professional oral history documenting the neighborhood• New interpretive displays will tell the story of the East Napa Historic District Cultural Resources Mitigation

• Significant and Unavoidable Impact• Overriding Considerations• Project Benefits Statement of Overriding Considerations

Socio-Economic Impacts of Alternatives
•File Notice of Determination (NOD) •Advance final design to 65% Complete•Right-of-Way• Execute a Cooperative Agreement with Caltrans• Map needs• Appraise property acquisitions• Make offers and negotiate • Provide relocation assistance• Utility agreements• Cultural resource mitigation•Apply for construction funding•Finalize design•Advertise, Award, and Approve (AAA) construction contract•Construction Next Steps

1. Adopt a resolution: (1) certifying an environmental impact report, in accordance with the California Environmental Quality Act (CEQA), for the Five-Way Intersection Improvements Project (SCH #2024071257); (2) making certain findings concerning significant impacts, mitigation measures, and alternatives; (3) approving the “Proposed Project”; (4) adopting a Statement of Overriding Considerations; and (5) adopting the Mitigation Monitoring and Reporting Program2. Adopt a resolution authorizing the Public Works Director pursuant to a certified Environmental Impact Report (SCH #2024071257), to execute on behalf of the City a Memorandum of Agreement (MOA) with the State Historic Preservation Officer (SHPO) regarding the Five-Way Intersection Improvements Project; and3. Adopt a resolution approving and authorizing, pursuant to a certified Environmental Impact Report (SCH #2024071257), the Public Works Director to execute Amendment No. 1 to Caltrans Cooperative Agreement 04-2517 / City Agreement C2023-160 with the California Department of Transportation to complete environmental analysis and design documents for the Five-Way Intersection Improvement Project.

Recommended Actions