Item 8.3 - CEQA Finding of Fact

National City City Council
March 21, 2023

Document
Item 8.3 - CEQA Finding of Fact
Meeting
March 21, 2023
Body
National City City Council
Pages
149
Original file
1.7 MB
Text extracted from the city's file for reading and search. Open the original on pub-nationalcity.escribemeetings.com. That file is the official record.

20xx-xxx
EXHIBIT “A”
Findings of Fact and Statement of Overriding Considerations (See attached.)

Page 9 of 222 ends

ATTACHMENT 7

THE BOARD OF PORT COMMISSIONERS
OF THE

SAN DIEGO UNIFIED PORT DISTRICT

FINDINGS OF FACT

FOR THE
National City Bayfront Projects & Plan
Amendments

FINAL ENVIRONMENTAL IMPACT REPORT
(UPD #EIR-2018-232; SCH #2018121054)
November 2022

Page 10 of 222 ends

i

TABLE OF CONTENTS
Page
INTRODUCTION........................................................................................................... 1

1.0 PROJECT DESCRIPTION .................................................................................. 2

1.1 Project Overview...................................................................................... 2

1.2 Project Location ....................................................................................... 4

1.3 Project Objectives.................................................................................... 5

2.0 ENVIRONMENTAL PROCEDURES ................................................................... 7

2.1 Lead Agency............................................................................................ 7

2.2 Environmental Impact Report .................................................................. 8

2.3 Public Participation .................................................................................. 8

2.4 Record of Proceedings ............................................................................ 8

3.0 FINDINGS UNDER CEQA .................................................................................. 9

3.1 Purpose ................................................................................................... 9

3.2 Terminology ............................................................................................. 9

3.3 Legal Effect............................................................................................11

3.4 Mitigation Monitoring and Reporting Program........................................11

4.0 FINDINGS REGARDING POTENTIAL DIRECT AND INDIRECT SIGNIFICANT EFFECTS.........................................................................................................11

4.1 Aesthetics and Visual Resources ..........................................................12

4.2 Air Quality and Health Risk ....................................................................17

4.3 Biological Resources .............................................................................25

4.4 Cultural Resources, Tribal Cultural Resources, and Paleontological Resources..............................................................................................44

4.5 Energy ...................................................................................................50

Page 11 of 222 ends

ii

4.6 Greenhouse Gas Emissions and Climate Change................................. 54

4.7 Hazards and Hazardous Materials.........................................................72

4.8 Land Use and Planning..........................................................................82

4.9 Noise and Vibration ...............................................................................86

4.10 Transportation, Circulation, and Parking................................................98

4.11 Utilities and Service Systems...............................................................108

5.0 FINDINGS REGARDING CUMULATIVE SIGNIFICANT EFFECTS................115

5.1 Air Quality and Health Risk ..................................................................116

5.2 Greenhouse Gas Emissions and Climate Change...............................119

5.3 Noise and Vibration .............................................................................122

5.4 Transportation, Circulation, and Parking..............................................124

6.0 FINDINGS REGARDING PROJECT ALTERNATIVES...................................125

6.1 Alternative 1 – No Project Alternative ..................................................128

6.2 Alternative 2 – No Waterside Development in Sweetwater Channel Alternative............................................................................................129

6.3 Alternative 3 – GB Capital Component Phase 1 Only Alternative........130

6.4 Alternative 4 – Reduced Development Intensity Alternative ................132 STATEMENT OF OVERRIDING CONSIDERATIONS..............................................135

Page 12 of 222 ends
Page 1 of 137 ends

FINDINGS OF FACT

FOR THE

NATIONAL CITY BAYFRONT PROJECTS & PLAN AMENDMENTS

FINAL ENVIRONMENTAL IMPACT REPORT
(UPD #EIR-2018-232; SCH #2018121054)

INTRODUCTION
The Board of Port Commissioners of the San Diego Unified Port District (District) hereby makes the following Findings concerning the Final Environmental Impact Report (UPD #EIR-2018-232; SCH #2018121054) for the National City Bayfront Projects and Plan Amendments (“proposed project”), pursuant to the California Environmental Quality Act, Public Resources Code §21000, et seq. (CEQA), and its implementing regulations, California Code of Regulations, Title 14, §15000, et seq. (State CEQA Guidelines).

The Final Environmental Impact Report (EIR) prepared for the proposed project consists of the following:
• Volume 1 of the Final EIR is composed of the following:
 Chapter 1 is an introduction to the Final EIR.
 Chapter 2 contains an overview of the revisions made to the Draft EIR.  Chapter 3 contains comments received on the Draft EIR during the public comment period and the District’s responses to those comments.  Chapter 4 contains references used in the Final EIR.
 Attachment 1 to the Final EIR contains the Mitigation Monitoring and Reporting Program (MMRP).
• Volume 2 of the Final EIR is a revised version of the Draft EIR, identifying changes in the text of the Draft EIR and other information added by the District in response to the public comments received during the public comment period.
• Volume 3 of the Final EIR consists of Appendices A through G of the Final EIR. Appendix Da (Revised Draft Port Master Plan Amendment associated with Balanced Plan) was added to the Final EIR.
• Volume 4 of the Final EIR consists of Appendices H through J of the Final EIR. Revisions were made to Appendix H (Marine Biological Resources Report) and Appendix J (Noise and Vibration Data and Calculations).

Appendix Ia (Historic Property Survey Report) was added to the Final EIR. • Volume 5 of the Final EIR consists of Appendix K of the Final EIR. Revisions were made to Appendix K (Transportation Impact Analysis).

Page 13 of 222 ends
Page 2 of 137 ends

• Volume 6 of the Final EIR consists of Appendices L through N of the Final EIR.

1.0 PROJECT DESCRIPTION

1.1 Project Overview
The District, City of National City (City), GB Capital Holdings (GB Capital), and Pasha Automotive Services (Pasha), as project applicants and proponents (collectively, project proponents), are proposing a project with both landside and waterside development components; an amendment to the District’s Port Master Plan (PMP); amendments to the City’s Local Coastal Program (LCP), General Plan, Harbor District Specific Area Plan (HDSAP), and Land Use Code (LUC) (Municipal Code Title 18 Zoning) (collectively “project” or “proposed project”) on approximately 77 acres, consisting of approximately 58 landside acres and 19 waterside acres (project site) within District and City jurisdiction in National City.

Specifically, the proposed project includes the following main components. • Changes to land and water use designations in the District’s PMP (National City Marina District Balanced Land Use Plan [Balanced Plan]). • Construction and operation of a recreational vehicle (RV) park, modular cabins, dry boat storage, an expanded marina, and up to four hotels, primarily within the District’s jurisdiction (GB Capital Component). • Construction and operation of a rail connector track and storage track within the District’s jurisdiction (Pasha Rail Improvement Component). • Closure of Tidelands Avenue between Bay Marina Drive and 32nd Street, as well as West 28th Street between Tidelands Avenue and Quay Avenue, within the District’s and City’s jurisdictions and redesignation of the area to Marine-Related Industrial in the District’s PMP (Pasha Road Closures Component).
• Construction and operation of Segment 5 of the Bayshore Bikeway within the District’s and City’s jurisdictions (Bayshore Bikeway Component). • Construction and operation of hotel, restaurant, retail, and/or a combination of tourist/visitor-serving commercial development north of Bay Marina Drive within the City’s jurisdiction (City Program – Development Component). • PMP Amendment (PMPA) to clarify jurisdictional land use authority, redesignate land uses, balance commercial and maritime uses, add appealable projects to the project list and change the Planning District accordingly (PMPA Component).
• Amendments to the City’s LCP, General Plan, HDSAP, and LUC that would include changes to jurisdictional boundaries; changes to subarea

Page 14 of 222 ends
Page 3 of 137 ends

boundaries; and changes to land use, specific plan, and zone designations (City Program – Plan Amendments Component).

The proposed Balanced Plan includes a PMPA and corresponding LCP amendment (LCPA) to correct jurisdictional land use maps and clarify the land use authority, redesignate land uses, and balance commercial and maritime uses. The Balanced Plan was created in response to a public planning process to identify a reconfiguration of land uses to optimize recreational, maritime, and commercial uses within the National City Marina District, which is the area generally north of Sweetwater Channel and west of the wildlife refuge (Paradise Marsh).

Implementation of the Balanced Plan would clearly delineate maritime land use boundaries from potential recreational and commercial land use boundaries while allowing operational efficiencies, but not throughput, to increase at the National City Marine Terminal (NCMT) and maintaining sensitivity to the function and sustainability of the Paradise Marsh, as well as public access and recreation in an expanded Pepper Park. The Balanced Plan proposes to accomplish this through the reconfiguration of roadways, a new rail connection, reconfiguration of commercial recreation and maritime-related land uses, the expansion of Pepper Park, and preservation of habitat buffers for the adjacent wildlife refuge.

The Balanced Plan, most of the GB Capital Component, the Pasha Rail Improvement Component, most of the Pasha Road Closures Component, and a portion of the Bayshore Bikeway Component are all within the District’s jurisdictional boundaries. Consequently, changes proposed by these components would require a PMPA and are referred to collectively as the “Port Master Plan Amendment Component” or “PMPA Component” and include:
• Incorporation of the Balanced Plan, most of the GB Capital Component, the Pasha Rail Improvement Component, and the alignment of the Bayshore Bikeway into the PMP.
• Removal of the Street designation for the street closures associated with the Pasha Road Closures Component and redesignation of these areas (with the exception of the area within the City’s jurisdiction) as MarineRelated Industrial. • Addition of approximately 12.4 acres of the Balanced Plan, located mostly on the GB Capital site east of the mean high tide line and owned in fee by the District, into the PMP.
• Addition of appealable projects to the project list.

Most of the proposed Bayshore Bikeway Component and the entire proposed City Program – Development Component are within the City’s jurisdiction.

Consequently, the City Program – Plan Amendments would consist of the following:

Page 15 of 222 ends
Page 4 of 137 ends

• Removal of approximately 12.4 acres of the Balanced Plan, located mostly on the GB Capital site east of the mean high tide line and owned in fee by the District, from the City’s General Plan, LCP, HDSAP, and LUC to reflect changes in land use and jurisdictional authority.
• Incorporation of seven parcels north of Bay Marina Drive and adjacent rights-of-way into the City’s HDSAP.

1.2 Project Location
The project site is located in the southwestern portion of National City, partially within the City’s existing jurisdiction, partially within the District’s existing jurisdiction. The project area is generally bordered by Paradise Marsh (part of the San Diego Bay National Wildlife Refuge/Sweetwater Marsh Unit) to the east, Sweetwater Channel to the south, NCMT and maritime uses to the west, and Civic Center Drive and commercial and industrial uses to the north.

Most of the project site is on land that is within the District’s jurisdiction, and the District has regulatory duties and proprietary responsibilities over these portions of the project site. These portions of land have included leases since 1990 to Pasha for operation of an automotive import/export business at the marine terminal and leases since 2008 to GB Capital for operation of a recreational boat marina. In addition, Pepper Park and a portion of Sweetwater Channel (west of the mean high tide line) are part of the project site included within the District’s jurisdiction, and a portion of Sweetwater Channel (east of the mean high tide line) is part of the project site included within the City’s jurisdiction.

The proposed project consists of the following six components, which, while not all contiguous, total approximately 77 acres, and are in the following general locations:
• The Balanced Plan is located within the District’s jurisdiction and is a land use plan to reconfigure land and water uses within the approximately 60.9- acre area generally north of Sweetwater Channel, south of the National Distribution Center, east of NCMT, and west of Paradise Marsh. The Balanced Plan proposes to reconfigure areas that are designated for Park/Plaza, Commercial Recreation, Marine Terminal, Marine-Related Industrial, Recreational Boat Berthing, and Street land uses in the Port Master Plan. The Balanced Plan also includes an expansion to Pepper Park.
• The GB Capital Component includes the Pier 32 Marina and the undeveloped lot to the north of the marina, part of the Sweetwater Channel to the south of the marina, and two existing parking lots utilized by Pasha, generally to the north and west of the marina. The GB Capital site is generally bounded by Sweetwater Channel to the south, Paradise Marsh to the east, the National Distribution Center facility to the north, and NCMT to the west. The GB Capital Component is proposed to be located generally on the area identified for a Commercial Recreation land use in the Balanced

Page 16 of 222 ends
Page 5 of 137 ends

Plan, but also extends into the City’s jurisdiction, and outside the Balanced Plan boundaries, in the Sweetwater Channel. The landside portions of the GB Capital Component, as well as the existing marina, and most of the jetty are located within the District’s jurisdiction.
• The Pasha Rail Improvement Component, which is located within the District’s jurisdiction, would traverse the lot bounded on the north by existing railroad tracks and the National Distribution Center, on the east by Marina Way, on the south by 32nd Street, and on the west by Tidelands Avenue.

The Pasha Rail Improvement Component is proposed to be located in the area identified for a Marine Related Industrial land use in the Balanced Plan. • The Pasha Road Closures Component is located on Tidelands Avenue, from south of Bay Marina Drive to 32nd Street, and West 28th Street, between Quay Avenue and Tidelands Avenue. The Pasha Road Closures Component is mostly located within District jurisdiction, and a portion (between Bay Marina Drive and the mean high tide line) is located within City jurisdiction.
• The Bayshore Bikeway Component is generally located on a combination of existing roadways, including Bay Marina Drive, Marina Way (formerly Harrison Avenue), McKinley Avenue, and Civic Center Drive. Most of the Bayshore Bikeway Component is located within the City’s jurisdiction, and the southernmost portion is located within District jurisdiction.

The City Program – Development Component is located within the City’s jurisdiction, north of Bay Marina Drive, generally bounded by West 23rd Street on the north, the Interstate (I-) 5 southbound off-ramp at Bay Marina Drive to the east, Bay Marina Drive to the south, and the BNSF Railway (BNSF) railroad tracks to the west (west of the intersection of Bay Marina Drive and Marina Way).

1.3 Project Objectives
To achieve the purpose and need of the proposed project, the District has identified the following objectives in coordination with the City.

1. Further activate the project site by modifying the land uses and their configurations to foster the development of high-quality commercial and recreational uses to maximize employment opportunities, maximize recreational opportunities for visitors, maximize economic development opportunities, and to improve cargo and transportation efficiencies of maritime industrial uses associated with operations at NCMT.

2. Reconfigure maritime and commercial uses to balance the anticipated future market demands for those uses, while also increasing public access on the project site.

Page 17 of 222 ends
Page 6 of 137 ends

3. Implement cohesive commercial development that is designed to enhance enjoyment of the National City Marina District and surrounding City area, contribute to the area’s economic vitality, and generate economic revenue for the City including through increased Transient Occupancy Tax.

4. Increase park space and recreational opportunities to enhance the waterfront experience for all visitors and maximize opportunities to attract tourism to the City.

5. Reduce unnecessary train movements and reduce the required effort associated with building daily trains by improving near-terminal rail storage capacity and creating a more direct connection between the BNSF Railway National City Yard and the NCMT.

6. Offset the loss of existing land used for maritime operations, as proposed in the Balanced Plan, by closing internal District streets (i.e., Tidelands Avenue and West 28th Street) adjacent to existing maritime operations to create contiguous space for maritime operations and configuring cargo operations at and adjacent to the NCMT to create cargo-handling efficiencies to reduce cargo movements.

7. Incorporate District properties into the PMP that are not currently regulated by the PMP to ensure consistency with the California Coastal Act, Public Trust Doctrine, and Port Act.

8. Be consistent with the City’s environmental policies and the District’s Climate Action Plan, Clean Air Program, and Jurisdictional Runoff Management Program to ensure that the proposed project does not adversely affect the District’s or City’s ability to attain their respective longrange environmental and sustainability goals.1

10.Incorporate a land use pattern for the National City Marina District into the PMP that establishes habitat buffers and implements operational features to avoid land use and operational inconsistencies between commercial, recreational, open space, and maritime uses.

11.Integrate National City, art, culture, and history into the development of the proposed project.

12.Increase the connectivity of the Project area to the surrounding area and facilitate increased pedestrian activity and enjoyment of San Diego Bay for visitors.
1 Objective 9, expand aquaculture potential on District tidelands, was removed because GB Capital withdrew its request for aquaculture from the proposed project.

Page 18 of 222 ends
Page 7 of 137 ends

2.0 ENVIRONMENTAL PROCEDURES

2.1 Lead Agency
Pursuant to State CEQA Guidelines §15367, the District is the “lead agency” because it has the principal responsibility for approving the proposed project and the majority of the project site is within the District’s land use jurisdiction. As the CEQA lead agency, the District also has primary responsibility for conducting an environmental review pursuant to CEQA. The District determined that an EIR should be prepared to analyze the environmental effects of the proposed project, which will be used by the Board of Port Commissioners (Board) in connection with its discretionary decisions regarding the proposed project. The Board is also responsible for approval of the PMPA and Coastal Development Permits (CDPs) and any real estate agreements for the project components within the District’s jurisdiction. If the Board approves the PMPA, the California Coastal Commission (CCC) will then consider whether to certify the PMPA. The CCC, as a CEQA responsible agency as defined State CEQA Guidelines §15381, would consider the EIR prior to making its decision whether to certify the PMPA. If the PMPA is fully certified by the CCC, the Board would consider approval of CDPs and leases for the project components within the District’s jurisdiction, allowing the proposed project within the District’s jurisdiction to proceed to construction.

The City is a responsible agency, as defined by State CEQA Guidelines §15381, and prior to reaching a decision on the proposed project, the City is required to consider the environmental effects generated from the project as analyzed in the EIR. The City is required to adopt a mitigation monitoring and reporting program for those portions within the City’s discretionary authority. The City’s approval is required for amendments to the City’s General Plan, LUC, LCP, and HDSAP and for authorization of issuance of CDP(s) for proposed project components within the City’s jurisdiction. Furthermore, the City’s approval is required for the issuance of other discretionary permits (e.g., CDPs, conditional use permit) and ministerial permits (e.g., grading, building, electrical). The CCC must approve the certification of, and final action by the City for amendments to the LCP, General Plan, LUC, and HDSAP which would occur post certification of the FEIR.

The California Department of Transportation (Caltrans) is also considered a responsible agency because approval from Caltrans would be required in order for GB Capital to use the Caltrans property south of the marina (the portion of the jetty east of the mean high tide line).

The California State Lands Commission (CSLC) is a trustee agency, as defined in State CEQA Guidelines Section 15386. CSLC may have an interest in the proposed project; however, CSLC would not issue approvals or permits that would be required to implement the proposed project.

Page 19 of 222 ends
Page 8 of 137 ends

2.2 Environmental Impact Report
Pursuant to State CEQA Guidelines §15080, et seq., the District prepared an EIR to analyze the potential environmental impacts of the proposed project. The Final EIR contains all the information required by State CEQA Guidelines §15132, including the Draft EIR and the appendices to the Draft EIR.

2.3 Public Participation
Environmental review of the proposed project began on December 20, 2018, with the publication of a Notice of Preparation (NOP) of the EIR and initiation of a public review period ending on January 31, 2019. The NOP was sent to the Office of Planning and Research and was filed with the San Diego County Clerk in accordance with State CEQA Guidelines §15082. The NOP and notices of its availability were mailed to public agencies, organizations, and other interested individuals to solicit their comments on the scope and content of the environmental analysis. The District also held a public scoping meeting on January 24, 2019, at the National City Aquatic Center.

The Draft EIR was completed and a Notice of Availability for public review was posted on September 29, 2021. A 50-day public review period began on September 29, 2021 and ended on November 17, 2021. The District received 19 comment letters during the public review period and five comment letters after close of the public review period.

These comments and the District’s responses to them are included in Chapter 3, Comments Received and District Responses, of Volume 1 of the Final EIR, as required by State CEQA Guidelines §15088 and §15132. The Final EIR was completed and made available for review on September 30, 2022. Public hearings concerning certification of the Final EIR were held by the Board of Port Commissioners of the District on October 11, 2022 and November 16, 2022, at which interested agencies, organizations, and individuals were given an opportunity to comment on the Final EIR and the proposed project.

2.4 Record of Proceedings
For purposes of CEQA and the findings set forth below, the administrative record of the District’s decision concerning certification of the Final EIR for the project shall include, but may not be limited to, the following:
• The Notice of Preparation and Initial Study (December 2018); • The Draft EIR (September 2021);
• The Final EIR (September 2022);
• The appendices to the Draft EIR and the Final EIR;

Page 20 of 222 ends
Page 9 of 137 ends

• All documents and other materials referenced and/or incorporated by reference in the Draft EIR and Final EIR, including but not limited to the materials identified in Chapter 9, References, of the Draft EIR; • All reports, applications, memoranda, maps, letters, and other documents prepared by the District’s staff and consultants for the proposed project, which are before the Board of Port Commissioners as determined by the District Clerk;
• All documents or other materials submitted by interested persons and public agencies in connection with the Draft EIR and the Final EIR; • The minutes, video recordings, and verbatim transcripts, if any, of the public hearings held on October 11, 2022 and November 16, 2022, concerning the Final EIR and the proposed project;
• Matters of common knowledge to the Board of Port Commissioners and the District, including but not limited to the Port Master Plan; and • Any other materials required to be in the record of proceedings by California Public Resources Code Section 21167.6(e).

The custodian of the documents and other materials composing the administrative record of the District’s decision concerning certification of the Final EIR is the Clerk of the Board of Port Commissioners. The location of the administrative record is the Port District’s office at 3165 Pacific Highway, San Diego, California 92101. (Public Resources Code §21081.6(a)(2).)

3.0 FINDINGS UNDER CEQA

3.1 Purpose
CEQA requires the District to make written findings of fact for each significant environmental impact identified in the Final EIR (State CEQA Guidelines §15091).

The purpose of the findings is to systematically restate the significant effects of the proposed project on the environment and to determine the feasibility of mitigation measures and alternatives identified in the Final EIR that would avoid or substantially lessen the significant environmental effects. Once it has adopted sufficient measures to avoid or substantially lessen a significant impact, the District is not required to adopt every mitigation measure identified in the Final EIR or otherwise brought to its attention. If significant impacts remain after application of all feasible mitigation measures, the District must review the alternatives identified in the Final EIR and determine if they are feasible. These findings set forth the reasons, and the evidence in support of, the District’s determinations.

3.2 Terminology
A “finding” is a written statement made by the District that explains how it dealt with each significant impact and alternative identified in the Final EIR. Each finding

Page 21 of 222 ends
Page 10 of 137 ends

contains a conclusion regarding each significant impact, substantial evidence supporting the conclusion, and an explanation of how the substantial evidence supports the conclusion.

For each significant effect identified in the Final EIR, the District is required by State CEQA Guidelines §15091(a) to make a written finding reaching one or more of the following conclusions:
(1) Changes or alterations have been required in, or incorporated into, the project that mitigate or avoid the significant effect identified in the EIR; (2) Such changes or alterations are within the responsibility and jurisdiction of another public agency and have been, or can and should be, adopted by that other agency; or
(3) Specific legal, economic, social, technological, or other considerations, including considerations for the provision of employment opportunities for highly trained workers, make infeasible the mitigation measures or project alternatives identified in the Final EIR.

A mitigation measure or an alternative is considered “feasible” if it is capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, legal, social, and technological factors (State CEQA Guidelines §15364). The concept of “feasibility” also encompasses the question of whether a particular alternative or mitigation measure promotes the underlying goals and objectives of a project (City of Del Mar v. City of San Diego (1982) 133 Cal.App.3d 410, 417). “‘[F]easibility under CEQA encompasses ‘desirability’ to the extent that desirability is based on a reasonable balancing of the relevant economic, environmental, social, and technological factors” (Ibid.; see also Sequoyah Hills Homeowners Assn. v. City of Oakland (1993) 23 Cal.App.4th 704, 715).

With respect to a project for which significant impacts are not avoided or substantially lessened either through the adoption of feasible mitigation measures or a feasible alternative, a public agency, after adopting proper findings, may nevertheless approve the project if the agency adopts a statement of overriding considerations setting forth the specific reasons why the agency found that the project’s benefits rendered acceptable its unavoidable adverse environmental effects. (State CEQA Guidelines §§15093, 15043 (b); see also Public Resources Code §21081(b)). The California Supreme Court has stated, “[t]he wisdom of approving…any development project, a delicate task which requires a balancing of interests, is necessarily left to the sound discretion of the local officials and their constituents who are responsible for such decisions. The law as we interpret and apply it simply requires that those decisions be informed, and therefore balanced” (Citizens of Goleta Valley v. Board of Supervisors (1990) 52 Cal.3d 553, 576).

A statement of overriding considerations is required for the approved project because it would have significant unavoidable environmental impacts on the following areas, which are described in detail in Volume 2 (Final EIR), Chapter 4, Environmental Impacts, and Chapter 5, Cumulative Impacts:

Page 22 of 222 ends
Page 11 of 137 ends

• Direct/project-level impacts on GHG emissions and climate change; noise and vibration; and transportation, circulation, and parking; and • Cumulative impacts on GHG emissions and climate change; and transportation, circulation, and parking.

3.3 Legal Effect
To the extent these findings conclude mitigation measures identified in the Final EIR are feasible and have not been modified, superseded, or withdrawn, the District hereby binds itself and any other responsible parties, including future project applicants and their successors in interest, to implement those mitigation measures. These findings are not merely informational, but constitute a binding set of obligations upon the District and responsible parties, which will take effect if and when the Board adopts a resolution certifying the Final EIR and adopts resolution(s) for the necessary project approvals.

3.4 Mitigation Monitoring and Reporting Program
In addition to adopting these findings, the District also adopts a Mitigation Monitoring and Reporting Program pursuant to Public Resources Code §21081.6 and State CEQA Guidelines §15097. This program is designed to ensure the proposed project complies with the feasible mitigation measures identified below during implementation of the approved project. The program is set forth in the “Mitigation Monitoring and Reporting Program for the National City Bayfront Projects & Plan Amendments,” which is adopted by the District concurrently with these findings and is incorporated herein by this reference (Final EIR Attachment 1, Mitigation Monitoring and Reporting Program).

4.0 FINDINGS REGARDING POTENTIAL DIRECT AND INDIRECT

SIGNIFICANT EFFECTS
As indicated in the EIR, the proposed project could result in direct and indirect significant environmental effects with respect to aesthetics and visual resources; air quality and health risk; biological resources; cultural resources, tribal cultural resources, and paleontological resources; energy; greenhouse gas emissions and climate change; hazards and hazardous materials; land use and planning; noise and vibration; transportation, circulation, and parking; and utilities and service systems. These potential significant environmental effects, and the mitigation measures identified to avoid or substantially lessen them, are discussed in detail in the applicable sections of Volume 2 (Final EIR). A summary of significant impacts and mitigation measures for the proposed project is set forth in Volume 2 (Final EIR), Chapter 2, Executive Summary, Table 2-3.

Set forth below are the findings regarding the potential direct and indirect significant effects of the approved project. The findings incorporate by reference the discussion of potentially significant impacts and mitigation measures contained in the Final EIR.

Page 23 of 222 ends
Page 12 of 137 ends

4.1 Aesthetics and Visual Resources

4.1.1 Impact-AES-1: Obstructed Views Within a Vista During Project Construction (GB Capital Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on aesthetics and visual resources (Impact-AES-1) related to construction activities in the marina, on the jetty, and in Sweetwater Channel associated with the GB Capital Component (Phase 1) that would result in significant temporary impacts on vista areas from Key Observation Point (KOP) 2. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.1, Aesthetics and Visual Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on aesthetics and visual resources identified as Impact-AES-1 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on aesthetics and visual resources (Impact-AES-1) is analyzed in Volume 2 (Final EIR), Section 4.1, Aesthetics and Visual Resources. Potential ImpactAES-1 would result from construction activities in the marina, on the jetty, and in Sweetwater Channel causing significant temporary impacts on vista areas from KOP 2.

The potentially significant impact on aesthetics and visual resources (Impact-AES1) would be reduced to below a level of significance by implementation of mitigation measure MM-AES-1: Install Construction Screening and Fencing, and MM-AES-2: Install Wayfinding and Public Access Signage, which are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR. These mitigation measures are discussed in Section 4.1, Aesthetics and Visual Resources, of Volume 2 of the EIR and provide as follows:

MM-AES-1: Install Construction Screening and Fencing (GB Capital Component).

GB Capital shall require their contractors to install construction-screening fencing around the perimeter of the jetty prior to the start of construction of the modular cabins and extended dock and pier with boat slips that shall shield construction activities from sight. The screening shall remain until construction equipment is removed from this area. Construction-screening fencing shall be depicted on construction plans and, prior to issuance of construction permits, the District’s Development Services Department shall confirm such fencing is depicted on the appropriate construction plans. Construction screening shall include, at a minimum, installation of 8-foot-tall fencing covered with view-blocking materials, such as tarp or mesh in a color that blends in with the existing environment (e.g., green or blue), for the duration of the construction period.

MM-AES-2: Install Wayfinding and Public Access Signage (GB Capital Component). Prior to construction of any GB Capital-related project elements

Page 24 of 222 ends
Page 13 of 137 ends

within the marina, on the jetty, or in Sweetwater Channel that would affect the view provided by KOP 2, GB Capital or their contractors shall install temporary legible wayfinding signage in visible areas (e.g., in the general vicinity of the existing overlook at KOP 2 and where the existing waterside promenade on the Pier 32 Marina intersects with Goesno Place) that directs the public to other available scenic vistas that would not be affected by construction activities and would provide substantially similar views, such as KOP 4 and KOP 5. GB Capital shall require that contractors submit the signage characteristics (e.g., size, color, materials) to the District’s Development Services Department for review and approval prior installation of the signage—provided however, that the temporary wayfinding signage shall at a minimum depict the direction and distance to the alternate KOP(s). Photographic proof of the installation of wayfinding signage shall be submitted to the District’s Development Services Department prior to the beginning of construction activities of the GB Capital Component (Phase 1) that involve construction in the marina, on the jetty, or in Sweetwater Channel and may be removed on completion of construction.

Implementation of mitigation measures MM-AES-1 and MM-AES-2 would reduce impacts on existing views and access to existing vistas associated with construction of Phase 1 of the GB Capital Component to a less than significant level.

4.1.2 Impact-AES-2: Inaccessibility of a Vista Area During Project Construction (GB Capital Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on aesthetics and visual resources (Impact-AES-2) related to construction activities associated with the GB Capital Component (Phase 1) that partially obstruct the view from KOP 3 and could restrict access to the KOP for up to two years. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.1, Aesthetics and Visual Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on aesthetics and visual resources identified as Impact-AES-2 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on aesthetics and visual resources (Impact-AES-2) is analyzed in Volume 2 (Final EIR), Section 4.1, Aesthetics and Visual Resources. Potential ImpactAES-2 would result from construction activities partially obstructing the view from KOP and potentially restricting access to the KOP for up to two years.

The potentially significant impact on aesthetics and visual resources (Impact-AES2) would be reduced to below a level of significance by implementation of mitigation measure MM-AES-3: Establish a Temporary Scenic Vista, which is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR.

Page 25 of 222 ends
Page 14 of 137 ends

This mitigation measure is discussed in Section 4.1, Aesthetics and Visual Resources, of Volume 2 of the EIR and provides as follows:

MM-AES-3: Establish a Temporary Scenic Vista (GB Capital Component). Prior to the commencement of construction of the GB Capital Component (Phase 1), GB Capital shall require its contractors to establish a temporary scenic vista directly east of KOP 3, adjacent to the western end of the existing Bayshore Bikeway bike path (before the existing path turns north), which shall be accessible to the public throughout the entirety of the construction phase of the GB Capital Component.

The project proponent shall provide temporary wayfinding signage at the GB Capital Component site and signage at the temporary scenic vista identifying it as a temporary scenic vista. Photographic proof of the establishment of the temporary scenic vista shall be submitted to the District’s Development Services Department prior to the beginning of construction activities of the GB Capital Component (Phase 1).

Implementation of mitigation measure MM-AES-3 would reduce impacts on existing views and access to existing scenic vistas associated with construction of Phase 1 of the GB Capital Component to less than significant levels by establishing a temporary scenic vista directly east of KOP 3.

4.1.3 Impact-AES-3: Reduction in Availability of Existing Views (GB Capital Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on aesthetics and visual resources (Impact-AES-3) related to the operation of GB Capital Component (Phase 1) that would introduce several new features that would clutter the existing viewshed from KOP 2 and reduce availability of existing middleground and background views. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.1, Aesthetics and Visual Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on aesthetics and visual resources identified as Impact-AES-3 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on aesthetics and visual resources (Impact-AES-3) is analyzed in Volume 2 (Final EIR), Section 4.1, Aesthetics and Visual Resources. Potential ImpactAES-3 would result from the introduction of new features related to the operation of GP Capital Component (Phase 1) that would clutter the existing viewshed from KOP 2 and reduce availability of existing middleground and background views.

The potentially significant impact on aesthetics and visual resources (Impact-AES3) would be reduced to below a level of significance by implementation of mitigation measures MM-AES-4: Install Permanent Wayfinding Signage for the Open Space Area on Jetty, and MM-AES-5: Extend the Existing Clear Zone Across Jetty, which are set forth in full in the MMRP and Table 2-3 in the Executive

Page 26 of 222 ends
Page 15 of 137 ends

Summary of the Final EIR. These mitigation measures are discussed in Section

4.1, Aesthetics and Visual Resources, of Volume 2 of the EIR and provide as follows:

MM-AES-4: Install Permanent Wayfinding Signage for the Open Space Area on Jetty (GB Capital Component). GB Capital shall construct the open space/park area on the jetty concurrently with the construction of the modular cabins and shall finish the open space area prior to or concurrently with said cabins. When construction of the modular cabins is complete, GB Capital or its contractors shall install permanent wayfinding signage that is legible and in a publicly accessible area at KOP 2/the existing Pier 32 overlook to direct visitors to the open space area on the jetty, where views of Sweetwater Channel to the southeast, south, and southwest would be available. GB Capital or its contractors shall submit the signage characteristics (e.g., size, color, materials) to the District’s Development Services Department for review and approval prior to installation—provided, however, that the wayfinding signage shall at a minimum contain the distance and direction to the open space area. Photographic proof of the wayfinding signage shall be submitted to the District’s Development Services Department prior to issuance of the certificate of occupancy.

MM-AES-5: Extend the Existing Clear Zone Across Jetty (GB Capital Component).

The project proponent for the GB Capital Component shall extend the existing minimum 20-foot-wide clear zone along the Pier 32 overlook southward across the jetty. The existing minimum 20-foot-wide clear zone and the proposed 20-foot-wide clear zone on the jetty shall be identified on the project plans. The open space/park area proposed on the jetty can be located within the 20-foot-wide clear zone. Prior to issuance of a coastal development permit that includes construction of the modular cabins, the District’s Development Services Department shall confirm that the existing and proposed minimum 20-foot-wide clear zone is identified and observed on the project plans.

Implementation of mitigation measures MM-AES-4 and MM-AES-5 would reduce impacts on existing views and access to existing scenic vistas associated with operation of Phase 1 of the GB Capital Component to less than significant levels by providing wayfinding signage to a similar vista and requiring a minimum 20-footwide clear zone along the existing Pier 32 overlook southward across the jetty to protect the view corridor.

4.1.4 Impact-AES-5: Development of the GB Capital Component Would Potentially Affect Visual Character Within the Pier 32 Marina (GB Capital Component)
Potentially Significant Impact: Because the GB Capital project is designed at a schematic level, the EIR identified potentially significant impacts on aesthetics and visual resources (Impact-AES-5) and the potential for the project to be inconsistent with Section 30251 of the California Coastal Act. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.1, Aesthetics and Visual Resources.

Page 27 of 222 ends
Page 16 of 137 ends

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on aesthetics and visual resources identified as Impact-AES-5 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on aesthetics and visual resources (Impact-AES-5) is analyzed in Volume 2 (Final EIR), Section 4.1, Aesthetics and Visual Resources. Potential ImpactAES-5 would result from portions of GB Capital Component being inconsistent with Section 30251 of the California Coastal Act since it is not yet fully designed.

The potentially significant impact on aesthetics and visual resources (Impact-AES5) would be reduced to below a level of significance by implementation of mitigation measure MM-AES-7: Design the GB Capital Component to Provide Continuity, which is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR. This mitigation measure is discussed in Section 4.1, Aesthetics and Visual Resources, of Volume 2 of the EIR and provides as follows:

MM-AES-7: Design the GB Capital Component to Provide Continuity (GB Capital Component). To provide a natural continuity with the existing marina complex, the GB Capital Component shall be designed and constructed using a similar architectural style and materials as the existing Pier 32 Marina. Prior to issuance of the Coastal Development Permit for both phases of the GB Capital Component, the District shall review plans for the GB Capital Component to ensure design continuity with the existing marina complex.

Implementation of mitigation measure MM-AES-7 would reduce potential impacts from the GB Capital Component (Impact-AES-5) to a less-than-significant level by it to be designed and constructed using a similar architectural style and materials as the existing Pier 32 Marina to provide a natural continuity with the existing marina complex.

4.1.5 Impact-AES-6: Reduction in Nighttime Views Due to Additional Lighting (GB Capital Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on aesthetics and visual resources (Impact-AES-6) resulting from the addition of new parking and landscape lighting as part of the development of GB Capital Component, which could disrupt wildlife behaviors and affect nighttime views.

Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.1, Aesthetics and Visual Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on aesthetics and visual resources identified as Impact-AES-6 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on aesthetics and visual resources (Impact-AES-6) is analyzed in Volume

Page 28 of 222 ends
Page 17 of 137 ends

2 (Final EIR), Section 4.1, Aesthetics and Visual Resources. Potential ImpactAES-6 would result from the addition of new outdoor lighting as part of the development of GB Capital Component, which could disrupt wildlife behaviors and affect nighttime views.

The potentially significant impact on aesthetics and visual resources (ImpactAES-6) would be reduced to below a level of significance by implementation of mitigation measures MM-AES-8: Limit Lighting, and MM-AES-9: Shield Security and Safety Lighting, which are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR. These mitigation measures are discussed in Section 4.1, Aesthetics and Visual Resources, of Volume 2 of the EIR and provide as follows:

MM-AES-8: Limit Lighting (GB Capital Component). Proposed outdoor lighting in the parking lots, in the marina, and outside of buildings shall not exceed a correlated color temperature of 2,700 Kelvins in order to emit less high frequency blue light. The project proponent shall provide details (i.e., Kelvins) of the proposed lighting to the District’s Development Services Department for review and approval prior to commencement of construction of the GB Capital Component.

MM-AES-9: Shield Security and Safety Lighting (GB Capital Component). Security and safety lighting proposed around the RV park, retail, marina, jetty, parking lot, hotels, and other outdoor common spaces shall consist of full cutoff pole-top fixtures with full cutoff shields to minimize light spillage into adjacent properties and land uses. The project proponent shall provide details of the proposed lighting to the District’s Development Services Department for review and approval prior to commencement of construction of the GB Capital Component.

Implementation of mitigation measures MM-AES-8 and MM-AES-9 would reduce potential impacts on nighttime views of the adjacent land uses from additional lighting sources (Impact-AES-6) by requiring lighting features that would emit less high-frequency blue light and reduce light spillage from the GB Capital Component to the adjacent land uses.

4.2 Air Quality and Health Risk

4.2.1 Impact-AQ-1: New Land Use Designations Not Accounted for in the RAQS and SIP (All Project Components)
Potentially Significant Impact: The EIR identifies a potentially significant impact on air quality and health risk (Impact-AQ-1) resulting from the new land use designations not being accounted for in the San Diego Regional Air Quality Strategy (RAQS) and state implementation plan (SIP). Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.2, Air Quality and Health Risk.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on air quality and health

Page 29 of 222 ends
Page 18 of 137 ends

risk identified as Impact-AQ-1 in the EIR. Further, pursuant to State CEQA Guidelines §15091(a)(2), certain of the changes or alterations are within the responsibility and jurisdiction of other public agencies and not the District and such changes can and should be adopted by such other agencies.

Facts in Support of Finding: The potentially significant impact of the proposed project on air quality and health risk (Impact-AQ-1) is analyzed in Volume 2 (Final EIR), Section 4.2, Air Quality and Health Risk. Potential Impact-AQ-1 would result from the new land use designations not being accounted for in the RAQS and SIP.

The land use changes were not known at the time the RAQS and SIP were last updated. The emissions associated with the proposed land uses could be greater than under existing land uses and these new emissions have not been accounted for in the current RAQS and SIP.

The potentially significant impact on air quality and health risk (Impact-AQ-1) would be reduced to below a level of significance by implementation of mitigation measure MM-AQ-1: Update the RAQS and SIP with New Growth Projections, which is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR. This mitigation measure is discussed in Section 4.2, Air Quality and Health Risk, of Volume 2 of the EIR and provides as follows:

MM-AQ-1: Update the RAQS and SIP with New Growth Projections (All Project Components). Within 6 months from approval of the proposed project, the District and City shall provide SANDAG with revised employment growth forecasts that account for buildout of the proposed project. This includes the amendments to the District’s PMP, and the City’s General Plan, LCP, HDSAP, and LUC to account for the proposed land use and jurisdictional changes. The District and the City shall coordinate with SANDAG and the SDAPCD to ensure the RAQS and SIP are updated as part of the next revision cycle to reflect the updated growth and land use assumptions of the project as well as the PMP and the City’s General Plan as a whole.

Implementation of mitigation measure MM-AQ-1 would reduce potential impacts associated with inconsistency with the RAQS and SIP to a less-than-significant level by ensuring the administrative process to update SANDAG’s growth projections is completed and the RAQS and SIP are updated by SANDAG and the SDAPCD. This would inform the air quality strategies contained within the RAQS and SIP and ensure these air quality plans adequately consider the redesignated uses at the project site.

4.2.2 Impact-AQ-2: Emissions in Excess of Criteria Pollutant Thresholds During Proposed Project Construction (All Components)
Potentially Significant Impact: The EIR identifies a potentially significant impact on air quality and health risk (Impact-AQ-2) associated with unmitigated project emissions during construction exceeding applicable significance thresholds.

Page 30 of 222 ends
Page 19 of 137 ends

Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.2, Air Quality and Health Risk.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on air quality and health risk identified as Impact-AQ-2 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on air quality and health risk (Impact-AQ-2) is analyzed in Volume 2 (Final EIR), Section 4.2, Air Quality and Health Risk. Potential Impact-AQ-2 would result from unmitigated project emissions during construction exceeding applicable significance thresholds that have been set to attain the National Ambient Air Quality Standards (NAAQS) and California Ambient Air Quality Standards (CAAQS) for criteria pollutants.

The potentially significant impact on air quality and health (Impact-AQ-2) would be reduced to below a level of significance by implementation of mitigation measures MM-AQ-2: Implement Diesel Emission-Reduction Measures During Construction (All Project Components), MM-AQ-3: Implement Fugitive Dust Control During Construction (All Project Components), MM-AQ-4: Use Low-VOC Interior and Exterior Coatings During Construction (GB Capital Component and City Program – Development Component), MM-AQ-5: Use Modern Harbor Craft During Construction Activities (GB Capital Component), and MM-AQ-6: Stagger Overlapping Construction Phases and Components (All Project Components).

These mitigation measures are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR.

These mitigation measures are discussed in Section 4.2, Air Quality and Health Risk, of Volume 2 of the EIR and provide as follows:

MM-AQ-2: Implement Diesel Emission-Reduction Measures During Construction (All Project Components). To control VOC, NOX, CO, PM10, and PM2.5 emissions during construction, the project proponent/operator and/or its contractor(s) shall implement or require implementation by its construction contractor(s) the following measures during construction of their corresponding proposed project component, and shall provide verification to the District (or City).

Prior to the commencement of construction activities of any project component, the project proponent for that project component shall submit a list of equipment to be used and their equipment specifications (model year, engine tier, horsepower) to the District’s Development Services Department (for the components’ within the District’s jurisdiction) or the City’s Community Development Department (for the component’s within the City’s jurisdiction) to ensure the construction equipment list is consistent with the following requirements. Following construction, the project proponent/operator and/or its contractor(s) shall provide written evidence that the construction was consistent with following requirements:

Page 31 of 222 ends
Page 20 of 137 ends

• For all construction between 2022 and 2025, ensure that all off-road diesel equipment engines over 25 horsepower shall be equipped with EPA Tier 3 or cleaner engines, unless Tier 3 construction equipment is not available within 50 miles of the project site. The project proponent shall document and submit evidence to the District prior to commencement of construction activities that Tier 3 or cleaner equipment shall be used, or that Tier 3 or better equipment is not available for use during the entire duration of that project’s construction period through 2025.
• For all construction beyond 2025, ensure that all off-road diesel equipment engines over 25 horsepower shall be equipped with EPA Tier 4 or cleaner engines, unless Tier 4 construction equipment is not available within 50 miles of the project site. The project proponent shall document and submit evidence to the District prior to commencement of construction activities that Tier 4 or cleaner equipment shall be used, or that Tier 4 or cleaner equipment is not available for use during the entire duration of that project’s construction period beyond 2025.
• Use renewable diesel fuel in all heavy-duty off-road diesel-fueled equipment. Renewable diesel must meet the most recent ASTM D975 specification for Ultra Low Sulfur Diesel and have a carbon intensity no greater than 50% of diesel with the lowest carbon intensity among petroleum diesel fuels sold in California.
• Maintain all equipment in accordance with the manufacturers’ specifications.
• Turn off all construction-related equipment, including heavy-duty equipment, motor vehicles, and portable equipment, when not in use for more than 3 minutes.
• Use zero or near-zero emissions equipment in-lieu of diesel or gasolinepowered equipment, where such zero or near-zero equipment is commercially available within 50 miles of the project site. • Use diesel particulate filters (or the equivalent) if permitted under manufacturer’s guidelines for on-road and off-road diesel equipment.

MM-AQ-3: Implement Fugitive Dust Control During Construction (All Project Components). To control fugitive PM10 and PM2.5 emissions during construction of any project component, the project proponent/operator and/or its contractor(s) for each component shall implement the following dust control measures in compliance with SDAPCD Rule 55. The following shall be conditions in any Coastal Development Permit or City-issued permit (such as grading and building permits) and shall be implemented by that project proponent/operator and/or its contractor(s).
• Water the grading areas at a minimum of three times daily to minimize fugitive dust.
• Stabilize graded areas as quickly as possible to minimize fugitive dust. • Apply chemical stabilizer or pave the last 100 feet of internal travel path within the construction site prior to public road entry. • Install wheel washers adjacent to a paved apron prior to vehicle entry on

Page 32 of 222 ends
Page 21 of 137 ends

public roads.
• Remove any visible track-out into traveled public streets within 30 minutes of occurrence.
• Wet wash the construction access point at the end of each workday if any vehicle travel on unpaved surfaces has occurred.
• Provide sufficient perimeter erosion control to prevent washout of silty material onto public roads.
• Cover haul trucks or maintain at least 12 inches of freeboard to reduce blowoff during hauling. • Suspend all soil disturbance and travel on unpaved surfaces if winds exceed 25 mph.
• Cover/water onsite stockpiles of excavated material.
• Enforce a 15 mph speed limit on unpaved surfaces.
• On dry days, sweep up any dirt and debris spilled onto paved surfaces immediately to reduce re-suspension of particulate matter caused by vehicle movement. Clean approach routes to construction sites daily for construction-related dirt in dry weather.
• Hydroseed, landscape, or develop as quickly as possible all disturbed areas and as directed by the District and/or SDAPCD to reduce dust generation. • Limit the daily grading volumes/area.

The project proponent/operator and/or its contractor(s) for each component shall submit evidence of the use of fugitive dust reduction measures to the District or City after the completion of construction.

MM-AQ-4: Use Low-VOC Interior and Exterior Coatings During Construction (GB Capital Component and City Program – Development Component). To control VOC emissions during any painting activities during construction, the project proponent/operator and/or its contractor(s) for all phases of GB Capital Component (Phase 1 and Phase 2) and City Program – Development Component shall use low-VOC coatings for all surfaces that go beyond the requirements of SDAPCD Rule 67.0. If architectural coatings (painting) of any single component or multiple components would exceed 10,000 square feet per day, then each project component active on that day shall use coatings with a VOC content of 10 grams per liter or less for all surfaces to be painted. If architectural coatings (painting) of any single component or multiple components would be below 10,000 square feet per day, then each component shall use coatings with a VOC content of 75 grams per liter or less. Prior to the commencement of construction activities associated with the GB Capital Component, the project proponent shall submit a list of coatings to be used, their respective VOC content, and a summary of surface area to be painted to the District’s Development Services Department. Prior to the commencement of construction activities associated with the City Program – Development Component, the project proponent shall submit a list of coatings to be used, their respective VOC content, and a summary of surface area to be painted to the City’s Community Development Department. The District and City, for their respective jurisdictions, may conduct inspections during construction to

Page 33 of 222 ends
Page 22 of 137 ends

verify the use of low-VOC coatings.

MM-AQ-5: Use Modern Harbor Craft During Construction Activities (GB Capital Component). Prior to commencing any waterside construction or activities, the project proponent/operator and/or its contractor(s) for the GB Capital Component shall ensure that any harbor craft, including but not limited to tugboats, pusher tugs, tow boats, work boats, crew boats, and supply boats for use during the duration of any in-water work, shall meet the following criteria:
• For all construction between 2022 and 2025, ensure all equipment is Tier 3 or better (cleaner).
• For all construction after 2025, ensure all equipment is alternatively fueled or electrically powered. If alternatively fueled or electrically powered equipment that emits less emission than Tier 4 or better (cleaner) is not available, then the project proponent shall ensure all equipment is Tier 4 or better.
• Use renewable diesel fuel in all heavy-duty off-road diesel-fueled equipment. Renewable diesel must meet the most recent ASTM D975 specification for Ultra Low Sulfur Diesel and have a carbon intensity no greater than 50% of diesel with the lowest carbon intensity among petroleum diesel fuels sold in California.

If clean harbor craft are not available within 200 miles of the project site for the duration of all dredging activities, the project proponent/operator and/or its contractor(s) for the GB Capital Component shall prioritize use of equipment that is maintained and properly tuned in accordance with manufacturers’ specifications.

The project proponent/operator and/or its contractor(s) for the GB Capital Component shall document and submit evidence to the District’s Development Services Department and/or the City’s Community Development Department prior to commencement of waterside construction activities, that equipment meeting the above tiering requirements or better standards is not available for use during the duration of all in-water activities. Regardless of the equipment used, the project proponent/operator and/or its contractor(s) for each component shall verify that all equipment has been checked by a mechanic experienced with such equipment and determined to be running in proper condition prior to admittance into the construction area. The project proponent/operator and/or its contractor(s) for each component shall submit a report prepared by the mechanic experienced with such equipment of the condition of the construction and operations vehicles and equipment to the District’s Development Services Department and/or the City’s Community Development Department prior to commencement of their use.

MM-AQ-6: Stagger Overlapping Construction Phases and Components (All Project Components). Each project proponent/operator and/or its contractor(s) shall submit a construction schedule and assumed construction activity at least 3 months prior to the start of construction to the District and City. If grading and waterside construction activities (associated with GB Capital Component Phase 1)

Page 34 of 222 ends
Page 23 of 137 ends

are to take place at the same time, they shall be reduced or staggered as to not to exceed daily air quality thresholds and such reduction or staggering shall be a condition of grading and building permits. However, multiple project components’ grading may take place at the same time. The District and City, for their respective jurisdictions, may conduct inspections during construction to verify activity.

Implementation of mitigation measures MM-AQ-2 through MM-AQ-6 would reduce potential impacts from construction-related emissions to less-than-significant levels, as shown in Tables 4.2-18 through 4.2-23 in Section 4.2, Air Quality and Health Risk, of Volume 2 of the EIR, by implementing measures and practices that reduce emissions and limit the overlap of activities associated with separate projects and project components.

4.2.3 Impact-AQ-3: Emissions in Excess of Criteria Pollutant Thresholds During Proposed Project Operation (GB Capital Component, City Program Component, and Balanced Plan)
Potentially Significant Impact: The EIR identifies a potentially significant impact on air quality and health risk (Impact-AQ-3) resulting unmitigated emissions during project operation exceeding criteria pollutant thresholds for volatile organic compound (VOC) and particulate matter (PM)10. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.2, Air Quality and Health Risk.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on air quality and health risk identified as Impact-AQ-3 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on air quality and health risk (Impact-AQ-3) is analyzed in Volume 2 (Final EIR), Section 4.2, Air Quality and Health Risk. Potential Impact-AQ-3 would result from emissions during the operation of the GB Capital Component, City Program Component, and the Balanced Plan exceeding the VOC and PM10 thresholds that have been set to attain the NAAQS and CAAQS. The major component of VOC and PM10 emissions during operation are woodburning hearths and fireplaces that may be attributed to RV park uses.

The potentially significant impact on air quality and health risk (Impact-AQ-3) would be reduced to below a level of significance by implementation of mitigation measure MM-AQ-7: Restrict Installation of Fireplaces and Firepits in New Construction, which is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR. This mitigation measure is discussed in Section 4.2, Air Quality and Health Risk, of Volume 2 of the EIR and provides as follows:

MM-AQ-7: Restrict Installation of Fireplaces and Firepits in New Construction (City Program, GB Capital Component [Phase 1 and Phase 2], and Balanced Plan). The

Page 35 of 222 ends
Page 24 of 137 ends

proponent/operator and/or its contractor(s) of the City Program – Development Component, the GB Capital Component, and the Balanced Plan shall ensure that no outdoor woodburning stoves, fireplaces, or firepits are installed, and all fireplaces and firepits shall be fueled by natural gas. The project proponent/operator and/or its contractor(s) for each component shall submit evidence that no outdoor woodburning stoves, fireplaces, or firepits are woodburning to the District (or City for City Program), and the District (or City for City Program) may conduct inspections during construction to verify the details that were submitted are accurate.

Implementation of mitigation measure MM-AQ-7 would reduce potential impacts associated with emissions from the operation of the proposed project to a lessthan-significant level, as shown in Table 4.2-24 in Section 4.2, Air Quality and Health Risk, of Volume 2 of the EIR, by restricting the installation of fireplaces and firepits in new construction.

4.2.4 Impact-AQ-4: Health Effects During Construction (All Project Components)
Potentially Significant Impact: The EIR identifies a potentially significant impact on human health risk (Impact-AQ-4) from project-related emissions during construction exceeding applicable significance thresholds for VOC, PM10, PM2.5, nitrogen oxide (NOX), and carbon monoxide (CO). Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.2, Air Quality and Health Risk.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on air quality and health risk identified as Impact-AQ-4 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on air quality and health risk (Impact-AQ-4) is analyzed in Volume 2 (Final EIR), Section 4.2, Air Quality and Health Risk. Potential Impact-AQ-4 would result from unmitigated project emissions during construction exceeding applicable significance thresholds that have been set to attain the NAAQS and CAAQS, the purpose of which is to provide for the protection of public health.

The potentially significant impact on air quality and health (Impact-AQ-4) would be reduced to below a level of significance by implementation of mitigation measures MM-AQ-2: Implement Diesel Emission-Reduction Measures During Construction (All Project Components), MM-AQ-3: Implement Fugitive Dust Control During Construction (All Project Components), MM-AQ-4: Use Low-VOC Interior and Exterior Coatings During Construction (GB Capital Component and City Program – Development Component), MM-AQ-5: Use Modern Harbor Craft During Construction Activities (GB Capital Component), and MM-AQ-6: Stagger Overlapping Construction Phases and Components (All Project Components).

These mitigation measures are set forth in full above and in the MMRP and Table

Page 36 of 222 ends
Page 25 of 137 ends

2-3 in the Executive Summary and are discussed in Section 4.2, Air Quality and Health Risk, in Volume 2 of the Final EIR.

Implementation of mitigation measures MM-AQ-2 through MM-AQ-6 would reduce potential health impacts from construction-related emissions to less-thansignificant levels by implementing measures and practices that reduce emissions and limiting the overlap of activities associated with separate projects and project components.

4.3 Biological Resources

4.3.1 Impact-BIO-1: Impacts on Estuary Seablite During Construction (Bayshore Bikeway Component Route 3)
Potentially Significant Impact: The EIR identifies a potentially significant impact on biological resources (Impact-BIO-1) related to construction activities that could result in direct mortality of estuary seablite, a special-status plant species. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.3, Biological Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on biological resources identified as Impact-BIO-1 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on biological resources (Impact-BIO-1) is analyzed in Volume 2 (Final EIR), Section 4.3, Biological Resources. Potential Impact-BIO-1 would result from indirect effects, such as trampling or other inadvertent impacts on estuary seablite during construction due to the plant’s proximity to the work areas for the Bayshore Bikeway Component.

The potentially significant impact on biological resources (Impact-BIO-1) would be reduced to below a level of significance by implementation of mitigation measure MM-BIO-1: Conduct Surveys and Monitoring for Estuary Seablite (Bayshore Bikeway Component Route 3). This mitigation measure is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provides as follows:

MM-BIO-1: Conduct Surveys and Monitoring for Estuary Seablite (Bayshore Bikeway Component 3): An authorized biologist shall be present onsite during construction within or adjacent to suitable habitat for estuary seablite to ensure that avoidance and minimization measures are in place according to specifications and to monitor construction in the vicinity of the estuary seablite population at a frequency necessary to ensure that avoidance and minimization measures are followed properly. The biological monitor shall report any noncompliance to CDFW within 24 hours.

Before ground disturbance or other activities associated with construction of

Page 37 of 222 ends
Page 26 of 137 ends

Bayshore Bikeway Component Route 3, a qualified botanist shall survey all proposed construction and access areas for presence of special-status plant species. Preconstruction surveys shall occur during the appropriate season and in accordance with established protocols up to 1 year in advance of construction, provided temporary construction easements have been granted to construction areas. These surveys shall be conducted in all construction areas that contain suitable habitat for special-status plant species. These surveys shall be for the purpose of documenting plant locations relative to the construction areas and ensure avoidance, where feasible. If construction starts prior to the appropriate season, and it is unfeasible to conduct preconstruction surveys, then plant documentation for avoidance and ESA fencing shall rely on previous population locations.

Populations of estuary seablite or other special-status plant species observed during these surveys shall be clearly mapped and recorded, along with the approximate numbers of individuals in each population and their respective conditions. Construction areas and construction access roads shall avoid loss of individual estuary seablite and other special status species.

MM-BIO-1 requires (1) a qualified botanist to conduct a preconstruction survey to document the location of special-status plant species and ensure avoidance, and (2) an authorized biologist to be present onsite during construction within or adjacent to suitable habitat for estuary seablite to ensure that avoidance and minimization measures are in place and followed properly. Implementation of mitigation measure MM-BIO-1 would reduce inadvertent impacts on estuary seablite (Impact-BIO-1) to less-than-significant levels by requiring surveys, monitoring, and avoidance measures when construction activities occur in close proximity to habitat for this species.

4.3.2 Impact-BIO-3: Impacts on Nesting Avian Species (GB Capital Component and Bayshore Bikeway Component Route 3)
Potentially Significant Impact: The EIR identifies a potentially significant impact on biological resources (Impact-BIO-3) from construction-related noise (e.g., grading, site preparation) in close proximity to salt marsh habitats supporting Belding’s Savannah sparrow or light-footed Ridgway’s rail and in-water construction near low-potential California least tern nesting habitat (although very low probability to occur) that could cause nest or chick abandonment. These impacts would be a violation of the Migratory Bird Treaty Act (MBTA) or California Fish and Game Code (CFGC). Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.3, Biological Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on biological resources identified as Impact-BIO-3 in the EIR.

Page 38 of 222 ends
Page 27 of 137 ends

Facts in Support of Finding: The potentially significant impact of the proposed project on biological resources (Impact-BIO-3) is analyzed in Volume 2 (Final EIR), Section 4.3, Biological Resources. Potential Impact-BIO-3 would result from the noise from construction activity that could impede the use of bird nesting sites during the nesting season. Disturbance to nesting activity would be considered a significant impact in violation of the MBTA or CFGC.

The potentially significant impact on biological resources (Impact-BIO-3) would be reduced to below a level of significance by mitigation measure MM-BIO-3: Avoid Avian Species During the Breeding Season. This mitigation measure is set forth in full in the MMRP and in Table 2-3 in the Executive Summary of the Final EIR and provides as follows:

MM-BIO-3: Avoid Construction within 300 Feet of Avian Species During the Breeding Season (GB Capital Component, and Bayshore Bikeway Component Route 3). All project construction activities occurring within 300 feet of salt marsh habitat (e.g., portions of Bayshore Bikeway Component Route 3 and some of the GB Capital Component) shall take place outside of the light-footed Ridgway’s rail and Belding’s Savannah sparrow breeding season (i.e., February 15–September 15); no construction work shall occur within 300 feet of the marsh during this time period.

To ensure protection of California least terns nesting at the D Street colony, project proponents shall avoid impact pile during the least tern nesting season. The nesting season for California least terns is defined here as April 1 through September 15.

MM-BIO-3 requires all construction activities occurring within 300 feet of salt marsh habitat to take place outside of the light-footed Ridgway’s rail and Belding’s Savannah sparrow breeding season (i.e., February 15–September 15).

Implementation of mitigation measure MM-BIO-3 would reduce the biological resources impact associated with disturbance to nesting activity (Impact-BIO-3) to less-than-significant levels by requiring that the start of construction activities occurs outside of the breeding season for light-footed Ridgway’s rail and Belding’s Savannah sparrow.

4.3.3 Impact-BIO-4: Impacts on Nesting Osprey (Pepper Park Expansion, Pasha Rail Improvement Component, and Roadway Configuration in Balanced Plan)
Potentially Significant Impact: The EIR identifies a potentially significant impact on biological resources (Impact-BIO-4) associated with construction-related noise in close proximity to osprey nests, such as those proposed for the Pepper Park Expansion, Pasha Rail Improvement Component, and roadway improvements envisioned in the Balanced Plan that could cause nest or chick abandonment.

These impacts would be inconsistent with the MBTA or CFGC. Detailed

Page 39 of 222 ends
Page 28 of 137 ends

information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.3, Biological Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on biological resources identified as Impact-BIO-4 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on biological resources (Impact-BIO-4) is analyzed in Volume 2 (Final EIR), Section 4.3, Biological Resources. Potential Impact-BIO-4 would result from construction activities could generate noise that has the potential to cause nest or chick abandonment.

The potentially significant impact on biological resources (Impact-BIO-4) would be reduced to below a level of significance by mitigation measure MM-BIO-4:

Avoid Impacts on Osprey During Nesting Season (January 15–June 15). This mitigation measure is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provides as follows:

MM-BIO-4: Avoid Impacts on Osprey During Nesting Season (January 15–June 15) (Pepper Park Expansion and Roadway Configuration in Balanced Plan, and Pasha Rail Improvement Component). To ensure nesting ospreys are not disturbed, the project proponent for the Balanced Plan (specifically, the roadway improvements and Pepper Park expansion), as well as the project proponent for the Pasha Rail Improvement Component, shall avoid all noise-generating construction activities during the osprey nesting season (January 15–June 15) within all proposed construction areas or shall implement all of the following:
• Surveys of historical nest locations maintained by the District shall be conducted to determine current occupancy status within 72 hours prior to construction/onset of noise-generating activities. If nests are occupied, or if the nest occupancy cannot be determined due to the height of the nest, the area shall be flagged and mapped on the construction plans, along with an avoidance buffer of sufficient size to avoid impacts on the nest. The project biologist shall determine the size of the avoidance buffer based on behavioral observations, ambient versus construction-related noise, and other data gathered during nest monitoring. All work within the avoidance buffer shall cease until the nesting cycle is complete. • Surveys of all potential osprey nest locations, including existing utility poles, shall be conducted within 72 hours prior to construction/ onset of noisegenerating activities within 500 feet of any proposed work areas where noise-generating activities could affect nest success. These surveys could be conducted concurrent with those anticipated under MM-BIO-5 for MBTA avian species or conducted separately.

If nests are occupied, or if the nest occupancy cannot be determined due to the

Page 40 of 222 ends
Page 29 of 137 ends

height of the nest, the area shall be flagged and mapped on the construction plans, along with an avoidance buffer of sufficient size to avoid impacts on the nest. The project biologist shall determine the size of the avoidance buffer based on behavioral observations, ambient versus construction-related noise, and other data gathered during nest monitoring. All work within the avoidance buffer shall cease until the nesting cycle is complete.

MM-BIO-4 requires the project proponent to avoid all noise-generating construction activities during the osprey nesting season (January 15 – June 15) within all proposed construction areas or to retain a qualified biologist to conduct preconstruction surveys and flag and map occupied nest locations and avoidance buffers on the construction plans. Implementation of mitigation measure MM-BIO4 would reduce the impact related to construction noise causing potential osprey nest or chick abandonment (Impact-BIO-4) to less-than-significant levels by requiring that the start of construction activities occurs outside of the osprey breeding and nesting season or by implementing preconstruction surveys, construction avoidance and minimization measures (e.g., avoidance buffers), and monitoring.

4.3.4 Impact-BIO-5: Potential Disturbance or Destruction of Nests Protected by the Migratory Bird Treaty Act and CFGC (Pepper Park Expansion and Roadway Configuration in Balanced Plan, GB Capital Component, and Bayshore Bikeway Component Route 3)
Potentially Significant Impact: The EIR identifies a potentially significant impact on biological resources (Impact-BIO-5) from the removal of Diegan coastal sage scrub habitat during construction, as well as noise from construction activity, which could impede the use of bird breeding sites during the nesting season (February 15–September 15). The destruction of an occupied nest would be considered a significant impact if it were a violation of the MBTA or CFGC. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.3, Biological Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on biological resources identified as Impact-BIO-5 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on biological resources (Impact-BIO-5) is analyzed in Volume 2 (Final EIR), Section 4.3, Biological Resources. Potential Impact-BIO-5 would result from active nests being destroyed or abandoned (e.g., due to human disturbance or noise) during construction, such as vegetation removal, grading, or site-preparation activities.

The potentially significant impact on biological resources (Impact-BIO-5) would be reduced to below a level of significance by mitigation measure MM-BIO-5: Avoid Impacts on MBTA Avian Species, Including Non-Listed Avian Species. This

Page 41 of 222 ends
Page 30 of 137 ends

mitigation measure is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provides as follows:

MM-BIO-5: Avoid Impacts on MBTA Avian Species, Including Non-Listed Avian Species (Pepper Park Expansion and Roadway Configuration in Balanced Plan, GB Capital Component, and Bayshore Bikeway Component Route 3). To ensure compliance with the MBTA and similar provisions under CFGC Sections 3503 and 3503.5, the project proponent for the Balanced Plan (specifically, roadway improvements, Pepper Park expansion), GB Capital Component, Pasha Rail Improvement Component, Bayshore Bikeway Component, and City Program – Development Component shall conduct all vegetation removal during the nonbreeding season between September 15 and January 14 or shall implement the following:
• If construction activities are scheduled between January 15 and September 14, a biological survey for nesting bird species shall be conducted within the proposed impact area and at least a 300-foot buffer within 72 hours prior to construction. The nesting bird survey is applicable to all avian species protected under the MBTA and Fish and Game Code. The number of surveys required for covering this area shall be commensurate with the schedule for construction and the acreage that shall be covered. Multiple surveys for nesting birds shall be separated by at least 48 hours in order to be confident that nesting is detected, but the survey shall be no more 72 hours prior to the onset of construction.
• If any active nests are detected, the area shall be flagged and mapped on the construction plans, along with an avoidance buffer of sufficient size to avoid impacts on the nest. The project biologist shall determine the size of the avoidance buffer based on behavioral observations, ambient versus construction-related noise, and other data gathered during nest monitoring.

All work within the avoidance buffer shall cease until the nesting cycle is complete.
• Nest buffers, nest survey techniques, and nest monitoring requirements shall be determined based on the project proponent’s avian biologist. In accordance with this mitigation measure, nest buffers shall be implemented to ensure compliance with the MBTA and Fish and Game Code Sections 3503, 3503.5, and 3513. Additionally, if grading activities, construction activities, or other noise-generating activities lapse for more than 48 hours, an additional nesting bird survey shall be conducted. The results of the nesting bird surveys and buffers, including any determinations to reduce buffers, shall be included in a monitoring report submitted to the project proponent.
• If a nesting bird management plan is required as part of the site-specific impact analysis and mitigation for a particular component, then the parameters in this mitigation measure shall be applied as the minimum requirements for that particular component. More restrictive measures than these can be stipulated in the nesting bird management plan for that

Page 42 of 222 ends
Page 31 of 137 ends

particular project component.

Implementation of MM-BIO-5 would reduce impacts on common and specialstatus avian species during construction activities (Impact-BIO-5) to less-thansignificant levels by requiring that the start of construction activities occurs outside of the breeding and nesting season or implementing construction measures and conducting preconstruction surveys in accordance with the MBTA and similar provisions under Sections 3503 and 3503.5 of the CFGC.

4.3.5 Impact-BIO-6: Bat Roost Site Direct Impacts (GB Capital Component, and Bayshore Bikeway Component Route 3)
Potentially Significant Impact: The EIR identifies a potentially significant impact on biological resources (Impact-BIO-6) related to removal or trimming of suitable roost trees, which could directly harm roosting bats, resulting in mortality of common or special-status bat species. These impacts could result in large bat mortality events and would be significant absent mitigation. Temporary indirect effects, such as noise, vibration, dust, and night lighting from construction, also could disturb roosting bats, should they be present within the area. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.3, Biological Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on biological resources identified as Impact-BIO-6 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on biological resources (Impact-BIO-6) is analyzed in Volume 2 (Final EIR), Section 4.3, Biological Resources. Potential Impact-BIO-6 would result from the removal or trimming of suitable roost trees, which could directly harm roosting bats, should they be present within the area during project construction.

The potentially significant impact on biological resources (Impact-BIO-6) would be reduced to below a level of significance by mitigation measure MM-BIO-6:

Conduct Surveys for Maternal Bat Roost Site Surveys and Avoid Seasonal Impacts. This mitigation measure is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provides as follows:

MM-BIO-6: Conduct Surveys for Maternal Bat Roost Site Surveys and Avoid Seasonal Impacts (GB Capital Component and Bayshore Bikeway Component Route 3). Prior to the start of project construction on the GB Capital Component or Bayshore Bikeway Component Route 3, a qualified bat biologist shall conduct a daytime assessment to examine structures and trees suitable for bat use. If bat sign is observed at that time, then nighttime bat surveys shall be conducted to confirm whether the structures or trees with suitable habitat identified during the preliminary assessment are utilized by bats for day roosting or night roosting, ascertain the level of bat foraging and roosting activity at each of these locations,

Page 43 of 222 ends
Page 32 of 137 ends

and perform exit counts to determine visually the approximate number of bats utilizing the roosts. Acoustic monitoring shall also be used during these surveys to identify the bat species present and determine an index of relative bat activity for that site on that specific evening.

If maternity sites are identified during the preconstruction bat habitat assessment, then no construction activities at that location shall be allowed during the maternity season (i.e., April 1–August 31) unless a qualified bat biologist has determined that the young have been weaned. If maternity sites are present, and it is anticipated that construction activities cannot be completed outside of the maternity season, then the qualified bat biologist, in consultation with CDFW, shall complete bat exclusion activities at maternity roost sites either as soon as possible after the young have been weaned or outside of the maternity season, or the qualified bat biologist, in coordination with CDFW, otherwise approves.

The removal of mature trees and snags shall be minimized to the greatest extent practicable. Prior to tree removal or trimming, qualified bat biologist shall examine large trees and snags to ensure that no roosting bats are present. Palm frond trimming, if necessary, shall be conducted outside the maternity season (i.e., April 1–August 31) to avoid potential mortality to flightless young and outside the bat hibernation season (November–February).

Implementation of MM-BIO-6 would avoid impacts on bat maternal roost colonies by requiring that project proponents survey for maternal bat roost sites and avoid impacts on these sites through seasonal avoidance or monitoring prior to the start of construction activities.

4.3.6 Impact-BIO-7: Potential Disruption of Fishes, Green Sea Turtle, and Marine Mammals and Altered Prey Availability to Sensitive FishFeeding Avian Species (GB Capital Component) Potentially Significant Impact: The EIR identifies a potentially significant impact on biological resources (Impact-BIO-7) associated with impact-hammer and vibratory-hammer pile-driving activities that could potentially generate enough underwater noise to injure (Level A Harassment) or alter behavior (Level B Harassment) of green sea turtles, fishes, and marine mammals. Noise-generating impacts resulting from project construction activities that cause fish to flee the project area could mean increased foraging distance for California least terns, resulting in lowered nest success for California least terns using the D Street nesting colony. The increased turbidity due to suspension of marine sediments during pile driving (impact, vibratory, jetting) or other sediment-disturbing activities can reduce the ability of fish-feeding marine birds to capture prey. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.3, Biological Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or

Page 44 of 222 ends
Page 33 of 137 ends

substantially lessen the significant environmental effect on biological resources identified as Impact-BIO-7 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on biological resources (Impact-BIO-7) is analyzed in Volume 2 (Final EIR), Section 4.3, Biological Resources. Potential Impact-BIO-7 would result from pile driving activities that could generate underwater noise that has the potential to injure (Level A Harassment) or alter behavior (Level B Harassment) of green sea turtles, fishes, and marine mammals.

The potentially significant impact on biological resources (Impact-BIO-7) would be reduced to below a level of significance by mitigation measure MM-BIO-7:

Avoidance of Impacts on Special-Status Wildlife During In-Water Construction Activities. This mitigation measure is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provides as follows:

MM-BIO-7: Avoidance of Impacts on Special-Status Wildlife During In-Water Construction Activities (GB Capital Component). During in-water pile installation, the contractor shall utilize pile jetting or vibratory methods (vibratory methods subject to additional measures below) to reduce the daily number of pile strikes to the extent practicable and must use fewer than 750 pile strikes per day to set pilings.

Prior to construction activities involving impact-hammer and vibratory in-water pile driving, the project proponent shall prepare and implement a marine mammal, fish injury, and green sea turtle monitoring program such as a Marine Fish Species Impact Avoidance and Minimization Plan. The District shall review the monitoring program, which shall include the following requirements:
• For a period of 15 minutes prior to the start of in-water construction, a qualified biologist, retained by the project proponent (i.e., GB Capital) and approved by the District’s Director of Development Services or their designee, shall monitor around the active pile driving areas to ensure that special-status species are not present. Monitors shall also monitor for injured fish and have the authority to stop work if there is an observation of concern.
• The construction contractor shall not start work if any observations of special-status species are made prior to starting pile driving. • In-water pile driving shall begin with soft starts, gradually increasing the force of the pile driving. This allows marine mammals, green sea turtles, and fishes to flee areas adjacent to pile-driving activities. • All monitors must meet the minimum requirements as defined by the National Oceanic Atmospheric Administration (NOAA)’s Guidance for Developing a Marine Mammal Monitoring Plan (NOAA 2019). • Recommendations in the marine mammal and green sea turtle monitoring program shall be consistent with the District’s Regional General Permit (RGP) 72.
• If the biological monitor determines that underwater noise is causing an

Page 45 of 222 ends
Page 34 of 137 ends

observable impact to any sensitive species, the biological monitor stop inwater construction or may require a bubble curtain be placed around pilings during impact driving to reduce the intensity of underwater sound pressure levels.
• A silt curtain shall be placed around the pile driving activity to restrict the distribution of turbidity associated with the re-suspension of marine sediments. The silt curtain shall be placed such that it does not drag on the bottom or contact eelgrass resources. In addition, the project proponent shall have a qualified contractor prepare and implement a water quality monitoring plan for the District’s review and approval to ensure that turbidity outside of the silt curtain does not increase more than 20% above ambient conditions during pile driving.
• The monitoring plan shall be implemented during all pile driving activities and be a part of any construction contracts of GB Capital’s in-water construction.

Implementation of MM-BIO-7 would reduce impacts on marine mammals, fishes, and green sea turtles (Impact-BIO-7) to less-than-significant levels by monitoring for marine mammals and green sea turtles prior to and during impact-hammer and vibratory pile driving and halting in-water pile-driving activities until the species has left the construction area. MM-BIO-7 would also reduce impacts on nesting California least tern to less than significant by ensuring that their prey (fish) is not disturbed during the nesting season by pile driving. Finally, MM-BIO-7 would reduce turbidity impacts on the foraging success of California brown pelican and other fish foraging marine birds to less than significant by maintaining water clarity and thereby allowing for foraging success similar to areas beyond the project area.

4.3.7 Impact-BIO-9: Reflective Materials and Increased Bird Strikes (GB Capital Component and City Program – Development Component) Potentially Significant Impact: The EIR identifies a potentially significant impact on biological resources (Impact-BIO-9) from the use of reflective building and glass finishes associated with hotel development, which may confuse birds in flight, leading to an increase in strikes. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.3, Biological Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on biological resources identified as Impact-BIO-9 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on biological resources (Impact-BIO-9) is analyzed in Volume 2 (Final EIR), Section 4.3, Biological Resources. Potential Impact-BIO-9 would result from the use of reflective building and glass finishes associated with hotel development, which may confuse birds in flight, leading to an increase in strikes. The proposed

Page 46 of 222 ends
Page 35 of 137 ends

project is also located along the coastline and includes a portion of a bird migration corridor and likely includes important migratory stopover habitat.

The potentially significant impact on biological resources (Impact-BIO-9) would be reduced to below a level of significance by mitigation measure MM-BIO-9:

Implement Bird Strike Reduction Measures on New Structures. This mitigation measure is set forth in full in the MMRP and Table 2-3 of the Executive Summary of the Final EIR and provides as follows:

MM-BIO-9: Implement Bird Strike Reduction Measures on New Structures (GB Capital Component and City Program – Development Component). Prior to issuance of any building construction/permits for any portion of the GB Capital Component or City Program – Development Component where the building would be taller than three stories, an ornithologist (retained by the respective project proponent and pre-approved by the District for the GB Capital Component or the City for the City Program – Development Component) familiar with local species will review building plans to verify that the proposed building has incorporated specific design strategies that qualify for Leadership in Energy and Environmental Design (LEED) credits, as described in the American Bird Conservancy’s BirdFriendly Building Design (Sheppard and Phillips 2015) or an equivalent guide to avoid or reduce the potential for bird strikes. Final building design strategies shall be in accordance with the Bird-Friendly Building Design, by incorporating strategies to minimize the threat to avian species, including but not limited to the following:
• Building Façade and Site Structures.
o Develop a building façade and site design that are visible as physical barriers to birds.
• Elements such as Netting, Screens, Grilles, Shutters, and Exterior Shades to Preclude Collisions.
o Incorporate materials that have a low threat potential based on the Bird Collision Threat Rating and the Bird Collision Threat Rating Calculation Spreadsheet to achieve a maximum total building Bird Collision Threat Rating of 15 or less.
 High Threat Potential: Glass: Highly Reflective or Completely Transparent Surface.
 Least Threat Potential: Opaque Surface
• Exterior Lighting
o Fixtures not necessary for safety, entrances, and circulation shall be automatically shut off from midnight until 6:00 a.m.
o Exterior luminaires must meet these requirements for all exterior luminaires located inside project boundary based on the following:
 Photometric characteristics of each luminaire when mounted in the same orientation and tilt as specified in the project design; and
 The lighting zone of the project property (at the time

Page 47 of 222 ends
Page 36 of 137 ends

construction begins). Classify the project under one lighting zone using the lighting zones definitions provided in the Illuminating Engineering Society and International Dark Sky Association (IES/IDA) Model Lighting Ordinance (MLO) User Guide (2011).
• Performance Monitoring Plan
o The project proponent (e.g., GB Capital) shall develop a 3-year postconstruction monitoring plan to routinely monitor the effectiveness of the building and site design in preventing bird collisions for buildings over three stories high that shall include methods to identify and document locations where repeated bird strikes occur, the number of collisions, the date, the approximate time, and features that may be contributing to collisions, and shall list potential design solutions and provide a process for adaptive management.
o The project proponent (e.g., GB Capital) shall provide an adaptive monitoring report demonstrating which design strategies have been incorporated and the results of adaptive monitoring for District review.

Implementation of MM-BIO-9 would reduce impacts on birds in flight (Impact-BIO9) to less-than-significant levels by requiring the incorporation of design strategies that enable birds to recognize structures from the open sky.

4.3.8 Impact-BIO-10: Disruption of Wildlife Behavior Due to Additional Lighting (GB Capital Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on biological resources (Impact-BIO-10) from new parking and landscape lighting that would be added to the GB Capital Component area as a result of the proposed development, including an RV park, retail, expanded marina, modular cabins, and hotel buildings, that would disrupt wildlife behaviors. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.3, Biological Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on biological resources identified as Impact-BIO-10 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on biological resources (Impact-BIO-10) is analyzed in Volume 2 (Final EIR), Section 4.3, Biological Resources. Potential Impact-BIO-10 would result from the new lighting added to the GB Capital Component area as a result of the proposed development, including an RV park, retail, expanded marina, modular cabins, and hotel buildings, that would disrupt wildlife behaviors.

The potentially significant impact on biological resources (Impact-BIO-10) would

Page 48 of 222 ends
Page 37 of 137 ends

be reduced to below a level of significance by mitigation measure MM-AES-8:

Limit Lighting. This mitigation measure is set forth in full in the MMRP and Table 2-3 of the Executive Summary in the Final EIR and provides as follows:

MM-AES-8: Limit Lighting (GB Capital Component). Proposed outdoor lighting in the parking lots, in the marina, and outside of buildings shall not exceed a correlated color temperature of 2,700 Kelvins in order to emit less high frequency blue light. The project proponent shall provide details (i.e., Kelvins) of the proposed lighting to the District’s Development Services Department for review and approval prior to commencement of construction of the GB Capital Component.

Implementation of MM-AES-8 would reduce the potential to disrupt wildlife behaviors from additional lighting sources (Impact-BIO-10) to less-than-significant levels by requiring lighting features that would emit less high-frequency blue light from the GB Capital Component.

4.3.9 Impact-BIO-11: Potential Loss of Diegan Coastal Sage Scrub During Project Construction (GB Capital Component and Bayshore Bikeway Component Route 3)
Potentially Significant Impact: The EIR identifies a potentially significant impact on biological resources (Impact-BIO-11) related to the potential removal of Diegan coastal sage shrub (including restored and baccharis-dominated forms) from construction activities, such as grading. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.3, Biological Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on biological resources identified as Impact-BIO-11 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on biological resources (Impact-BIO-11) is analyzed in Volume 2 (Final EIR), Section 4.3, Biological Resources. Potential Impact-BIO-9 would result from construction activities for the Bayshore Bikeway Component and GB Capital Component, which has the potential to remove Diegan coastal sage scrub.

The potentially significant impact on biological resources (Impact-BIO-11) would be reduced to below a level of significance by mitigation measure MM-BIO-10:

Provide Compensatory Mitigation for Impacts on Coastal Sage Scrub. This mitigation measure is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provides as follows:

MM-BIO-10: Provide Compensatory Mitigation for Impacts on Coastal Sage Scrub (GB Capital Component and Bayshore Bikeway Component Route 3).

Compensation for permanent impacts on Diegan coastal sage scrub habitats shall occur at a minimum 1:1 ratio, with compensation occurring as creation, enhancement, or restoration. The compensation can occur through a combination

Page 49 of 222 ends
Page 38 of 137 ends

of one or more of the following: onsite enhancement, re-establishment, or creation; or payment into an agency-approved in-lieu fee, mitigation program, or other approved mitigation provider. Compensation type and final mitigation ratios shall be determined during the project’s coastal development permitting phase.

Temporary impacts on Diegan coastal sage scrub habitats shall be replaced at a 1:1 ratio through onsite restoration. Onsite, in-kind restoration of temporarily affected Diegan coastal sage scrub would occur at their current locations on completion of construction, consisting of returning affected areas to original contour grades, decompacting the soil, and replanting with hydroseeding or container plantings using a plant palette composed of native species from the local region prior to disturbance. All revegetated areas shall avoid the use of any nonnative plant species.

For any areas that shall be restored, enhanced, or created onsite, the project proponent (e.g., National City for Bayshore Bikeway; GB Capital, etc.) shall prepare a Habitat Mitigation and Monitoring Plan (HMMP) prior to project construction in accordance with requirements of the CCC. The HMMP shall outline all required components, including, but not limited to, a project description, goal of the mitigation, mitigation site, implementation plan, monitoring plan, completion of mitigation/ success criteria, and contingency measures. The HMMP shall address the onsite restoration of temporary impact areas and compensatory mitigation at on- or offsite areas to mitigate permanent impacts.

Implementation of MM-BIO-10 would mitigate for impacts (Impact-BIO-11) on Diegan coastal sage scrub to less-than-significant levels by requiring the project proponent to provide assurances for the provision of compensatory mitigation at ratios agreed on by the resource agencies.

4.3.10 Impact-BIO-13: Potential Reduction in Eelgrass Habitat and Productivity During Construction (GB Capital Component) Potentially Significant Impact: The EIR identifies a potentially significant impact on biological resources (Impact-BIO-13) related to eelgrass beds within the waterside portion of the GB Capital Component being potentially reduced by inwater construction activities. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.3, Biological Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on biological resources identified as Impact-BIO-13 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on biological resources (Impact-BIO-13) is analyzed in Volume 2 (Final EIR), Section 4.3, Biological Resources. Potential Impact-BIO-13 would result from in-water construction activities, which have the potential to affect eelgrass beds within the waterside portion of the GB Capital Component. Impacts to eelgrass

Page 50 of 222 ends
Page 39 of 137 ends

may include direct physical disturbance to the beds from anchoring, propeller wash, and staging of equipment, temporary shading from construction-related equipment, and elevated turbidity levels from construction-related activities such as pile driving.

The potentially significant impact on biological resources (Impact-BIO-13) would be reduced to below a level of significance by mitigation measures MM-BIO-7:

Avoidance of Impacts on Special-Status Wildlife During In-Water Construction Activities, MM-BIO-12: Provide Contractor Education, Utilize Ecological Moorings, and Develop an Eelgrass Mitigation and Monitoring Plan in Compliance with the California Eelgrass Mitigation Policy, and MM-BIO-13: Implement Overwater Coverage Mitigation Through the USACE Permitting Process in Consultation with CCC, NMFS, USFWS, RWQCB, and the District to Compensate for Loss of Open Water Habitat and Function. These mitigation measures are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR.MM-BIO-7 also is set forth in full above and MM-BIO-12 and MM-BIO-13 provide as follows:

MM-BIO-12: Provide Contractor Education, Utilize Ecological Moorings, and Develop an Eelgrass Mitigation and Monitoring Plan in Compliance with the California Eelgrass Mitigation Policy (GB Capital Component). Prior to the start of any in-water construction, the project proponent shall retain a qualified marine biologist to provide contractor education relative to the presence and sensitivity of eelgrass beds. The contractor shall be provided with a map that depicts the location of eelgrass within the work area. The contractor shall be instructed to use the minimal propeller thrust necessary when working in shallow water to avoid dislodging eelgrass or generating excessive turbidity. The contractor shall also be instructed not to place anchors or spuds over portions of the seafloor that support eelgrass.

The proposed vessel moorings shall use ecologically sensitive mooring systems that minimize contact with the ocean bottom, to reduce scouring impacts.

Examples of these systems include flexible lines with anchors that are permanently embedded into the bottom. The GB Capital Component shall include educational materials to boat operators describing how ecological moorings work and specifying that boat operators shall utilize the ecological moorings.

Prior to the start of any in-water construction, the project proponent shall retain a qualified marine biologist to develop an eelgrass mitigation plan in compliance with the California Eelgrass Mitigation Policy. The mitigation plan shall be submitted to the District and resource agencies for approval and shall be implemented to compensate for losses to eelgrass in the event that the surveys described below indicate the project affected eelgrass. The eelgrass mitigation plan shall use updated eelgrass monitoring data to establish the amount of eelgrass present, and that data shall be collected within six months of the first draft of the mitigation plan.

Additionally, the mitigation plan shall provide a summary of all mitigation sites considered during the evaluation and provide the rationale for the chosen

Page 51 of 222 ends
Page 40 of 137 ends

mitigation site(s). A mitigation site must be secured prior to in-water construction that would impact eelgrass. Finally, the plan shall also include a habitat loss/gain analysis table and any changes to the losses or gains shall be captured in revisions to the mitigation plan as additional surveys as specified below are performed.

To the extent practical, the mitigation shall attempt to achieve the creation of a contiguous eelgrass bed with eelgrass density at or above that present within the patchy eelgrass beds present within the Sweetwater River Channel. This will provide for enhanced fisheries benefit and therefore benefit to fish-foraging avian species such as California least tern. The mitigation plan shall be provided with permit applications required under the Rivers and Harbors Act (Section 10) and CWA (Section 401, Section 404), which would require supplemental resource agency consultation during the permitting process. The specific eelgrass mitigation plan elements shall include the following:
• Prior to the commencement of any in-water construction activities, a qualified marine biologist that the project proponent retains and the District approves shall conduct a preconstruction eelgrass survey per the California Eelgrass Mitigation Policy. Surveys for eelgrass shall be conducted during the active eelgrass growing season (March–October), and results shall be valid for 60 days, unless completed in September or October; if completed in those months, results shall be valid until resumption of the next growing season. The qualified marine biologist shall submit the results of the preconstruction survey to the District and resource agencies within 30 days. • Within 30 days of completion of in-water construction activities, a qualified marine biologist that the project proponent retains and the District approves shall conduct a postconstruction eelgrass survey during the active eelgrass growing season. The postconstruction survey shall evaluate potential eelgrass impacts associated with construction. On completion of the postconstruction survey, the qualified marine biologist shall submit the survey report to the District and resource agencies within 30 days. • At least 2 years of annual postconstruction eelgrass surveys shall be conducted during the active eelgrass growing season. The additional annual surveys shall evaluate the potential for operational impacts on eelgrass. Specifically, the surveys shall be designed to evaluate potential shading impacts noted in the project’s marine biological assessment (Appendix H of the EIR).
• In the event that eelgrass impacts are detected during post-construction monitoring, the project proponent shall implement the following:
o A qualified marine biologist that the project proponent retains for the GB Capital Component and the District approves shall develop a mitigation plan for in-kind mitigation per the California Eelgrass Mitigation Policy. The qualified marine biologist shall submit the mitigation plan to the District and resource agencies within 60 days following the postconstruction survey.
o Mitigation for eelgrass impacts shall be at a ratio of 1.2:1, and the

Page 52 of 222 ends
Page 41 of 137 ends

project proponent shall determine eelgrass mitigation sites prior to the commencement of construction activities.
o Mitigation shall commence within 135 days of any noted impacts on eelgrass, such that mitigation commences within the same eelgrass growing season that impacts occur.
o Any mitigation that requires harvesting and transplantation of eelgrass shall require the qualified marine biologist to obtain a scientific collecting permit from CDFW for the purpose of harvesting eelgrass to support the mitigation.
• Upon completing mitigation, the qualified biologist shall conduct mitigation performance monitoring at performance milestones of 0, 12, 24, 36, 48, and 60 months. The qualified biologist shall conduct all mitigation monitoring during the active eelgrass growing season and shall avoid the low-growth season (November–February). Performance standards shall be in accordance with those prescribed in the California Eelgrass Mitigation Policy.
• The qualified biologist shall submit the monitoring reports and spatial data to the District and resource agencies within 30 days after the completion of each monitoring period. The monitoring reports shall include all of the specific requirements identified in the California Eelgrass Mitigation Policy.

MM‐BIO‐13: Implement Overwater Coverage Mitigation through the USACE Permitting Process in Consultation with CCC, NMFS, USFWS, RWQCB, and the District to Compensate for Loss of Open Water Habitat and Function (GB Capital Component). The waterside GB Capital Component within Sweetwater Channel shall require implementation of regulatory agency-approved mitigation prior to implementation of the project to reduce overwater coverage. This may include reduction in overwater coverage at another location in San Diego Bay, restoration of upland riparian habitats, restoration of submerged aquatic vegetation, water quality-improvement techniques, restoration of soft-bottom habitats, such as mud flats, or use of mitigation bank credits or credits from the USACE permit for the construction of the marina from uplands or paying an in lieu fee (once a program is developed but prior to increase in overwater coverage). Detailed shading studies would be required in the future when construction and project design details are available, which would require supplemental environmental review. The project proponent shall conduct the shading studies and implement the following:
• To the extent practical, overwater structures shall be placed in a manner that minimizes shading of eelgrass and avoids scouring impacts on the seabed.
• Prior to issuance of a Coastal Development Permit, the project proponent (i.e., GB Capital) shall request a pre-application meeting with the USACE, in consultation with CCC, NMFS, USFWS, RWQCB, and the District, to identify locations within San Diego Bay or the San Diego region to mitigate

Page 53 of 222 ends
Page 42 of 137 ends

impacts on both sensitive avian species and nearshore habitat associated with loss of beneficial uses associated with overwater coverage and loss of open water- habitat function as a result of increased structural fill within San Diego Bay.
• Prior to the commencement of construction activities of the waterside improvements of the GB Capital Component, the project proponent shall implement mitigation options that the regulatory agencies identified above review and approve.
• The project proponent shall secure all applicable permits for the mitigation of overwater coverage prior to commencement of waterside construction.

Implementation of MM-BIO-7, MM-BIO-12, and MM-BIO-13 would reduce impacts on eelgrass during construction (Impact-BIO-13) to less-than-significant levels by mitigating any loss of eelgrass habitat at a ratio of 1.2:1, as prescribed in the California Eelgrass Mitigation Policy, and requiring mitigation to be reviewed and approved by appropriate resource agencies.

4.3.11 Impact-BIO-14: Potential Loss of Eelgrass Habitat Due to Overwater Coverage or Shading Impacts During Operations (GB Capital Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on biological resources (Impact-BIO-14) related to the potential loss of eelgrass habitat within the waterside portion of the GB Capital due to shading from overwater structures, including the floating dock, docked vessels, and moored vessels. Scouring from mooring chains and tackle can also directly disturb softbottom vegetated habitats. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.3, Biological Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on biological resources identified as Impact-BIO-14 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on biological resources (Impact-BIO-14) is analyzed in Volume 2 (Final EIR), Section 4.3, Biological Resources. Potential Impact-BIO-14 would result from operations associated with the waterside portion of the GB Capital Component, which have the potential to affect eelgrass beds due to shading of eelgrass habitat from overwater structures, including the floating dock, docked vessels, and moored vessels.

The potentially significant impact on biological resources (Impact-BIO-14) would be reduced to below a level of significance by mitigation measures MM-BIO-12:

Provide Contractor Education, Utilize Ecological Moorings, and Develop an Eelgrass Mitigation and Monitoring Plan in Compliance with the California Eelgrass

Page 54 of 222 ends
Page 43 of 137 ends

Mitigation Policy, and MM-BIO-13: Implement Overwater Coverage Mitigation Through the USACE Permitting Process in Consultation with CCC, NMFS, USFWS, RWQCB, and the District to Compensate for Loss of Open Water Habitat and Function. These mitigation measures are set forth in full above and in the MMRP and Table 2-3 in the Executive Summary of the Final EIR.

Implementation of MM-BIO-12 and MM-BIO-13 would reduce impacts on eelgrass during construction (Impact-BIO-14) to less-than-significant levels by mitigating any loss of eelgrass habitat at a ratio of 1.2:1, as prescribed in the California Eelgrass Mitigation Policy, and requiring mitigation to be reviewed and approved by appropriate resource agencies.

4.3.12 Impact-BIO-15: Potential Conflict with the INRMP (Pepper Park Expansion and Roadway Configuration Balanced Plan, GB Capital Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on biological resources (Impact-BIO-15) related to the potential conflict with related strategies and objectives of the INRMP. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.3, Biological Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on biological resources identified as Impact-BIO-15 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on biological resources (Impact-BIO-15) is analyzed in Volume 2 (Final EIR), Section 4.3, Biological Resources. Potential Impact-BIO-15 would result from potential conflicts between strategies and objectives of the INRMP and operations associated with the waterside portion of Pepper Park Expansion and Roadway Configuration Balanced Plan and the GB Capital Component.

The potentially significant impact on biological resources (Impact-BIO-15) would be reduced to below a level of significance by implementation of mitigation measures MM-BIO-1 through MM-BIO-10. These mitigation measures are set forth in full above and in the MMRP and Table 2-3 in the Executive Summary of the Final EIR.

Implementation of MM-BIO-1 through MM-BIO-10 would reduce impacts relating to conflict with the strategies and objectives of the INRMP (Impact-BIO-15) to lessthan-significant levels by avoiding or reducing the related physical impacts to biological resources and ensuring that the project does not conflict with or obstruct implementation of the INRMP.

Page 55 of 222 ends
Page 44 of 137 ends

4.3.13 Impact-BIO-16: Potential Conflict with City General Plan – Agriculture and Open Space Element (Bayshore Bikeway Component Route 3) Potentially Significant Impact: The EIR identifies a potentially significant impact on biological resources (Impact-BIO-16) related to the potential conflict with related strategies and objectives of the City General Plan – Agriculture and Open Space Element (Bayshore Bikeway Component Route 3). Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.3, Biological Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on biological resources identified as Impact-BIO-16 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on biological resources (Impact-BIO-16) is analyzed in Volume 2 (Final EIR), Section 4.3, Biological Resources. Potential Impact-BIO-16 would result from potential conflicts between strategies and objectives of the City General Plan – Agriculture and Open Space Element and the Bayshore Bikeway Component Route 3.

The potentially significant impact on biological resources (Impact-BIO-16) would be reduced to below a level of significance by implementation of mitigation measures MM-BIO-1 through MM-BIO-10. These mitigation measures are set forth in full above and in the MMRP and Table 2-3 in the Executive Summary of the Final EIR.

Implementation of MM-BIO-1 through MM-BIO-10 would reduce impacts relating to conflict with the strategies and objectives of the City General Plan – Agriculture and Open Space Element (Impact-BIO-16) to less-than-significant levels by avoiding or reducing the related physical impacts to biological resources and ensuring that the project does not conflict with or obstruct implementation of the City General Plan – Agriculture and Open Space Element.

4.4 Cultural Resources, Tribal Cultural Resources, and Paleontological Resources

4.4.1 Impact-CUL-2: Excavation Related to the Proposed Project Would Potentially Damage Significant Archaeological Resources (Balanced Plan, GB Capital Component, Pasha Rail Improvement Component, Pasha Road Closures Component, Bayshore Bikeway Component) Potentially Significant Impact: The EIR identifies a potentially significant impact on archeological resources (Impact-CUL-2) resulting from inadvertently unearthing significant unknown archaeological resources during ground-disturbing construction activities in areas of archaeological sensitivity. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2

Page 56 of 222 ends
Page 45 of 137 ends

(Final EIR), Section 4.4, Cultural Resources, Tribal Cultural Resources, and Paleontological Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on cultural resources, tribal cultural resources, and paleontological resources identified as Impact-CUL2 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on archeological resources (Impact-CUL-2) is analyzed in Volume 2 (Final EIR), Section 4.4, Cultural Resources, Tribal Cultural Resources, and Paleontological Resources. Potential Impact-CUL-2 would result from inadvertently damaging or destroying significant unknown archaeological resources during ground-disturbing construction activities in areas of archaeological sensitivity (defined as the area east of the mean high tide line and south of Bay Marina Drive).

The potentially significant impact on archaeological resources (Impact-CUL-2) would be reduced to below a level of significance by mitigation measures MMCUL-2: Prepare and Implement a Cultural Resources Monitoring and Discovery Plan, MM-CUL-3: Prepare and Implement a Cultural Resources Awareness Training Prior to Project Construction, MM-CUL-4: Conduct Archaeological Monitoring in Areas of Sensitivity, and MM-CUL-5: Conduct Native American Monitoring in Areas of Sensitivity. These mitigation measures are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provide as follows:

MM-CUL-2: Prepare and Implement a Cultural Resources Monitoring and Discovery Plan (Balanced Plan, GB Capital Component, Pasha Rail Improvement Component, Pasha Road Closures Component, Bayshore Bikeway Component).

Prior to the commencement of any ground-disturbing activities within the areas requiring archaeological monitoring (i.e., activities occurring in the area that is both east of the mean high tide line and south of Bay Marina Drive), the respective project proponent shall retain a qualified archaeologist (approved by the District for components within its jurisdiction or the City for components within its jurisdiction) who meets the SOI Professional Qualification Standards (36 CFR 61) to prepare a CRMDP for designated portions of the Balanced Plan, GB Capital Component, Pasha Rail Improvement Component, Pasha Road Closures Component, and Bayshore Bikeway Component that are sensitive for archaeological resources, defined as the area east of the mean high tide line and south of Bay Marina Drive. Monitoring areas are defined as land-based grounddisturbing activities associated with project components east of the mean high tide line and south of Bay Marina Drive. Procedures to follow in the event of an unanticipated discovery apply to all applicable project components. The CRMDP shall be submitted to the City and District, as applicable based on the jurisdiction in which the project component is located, and shall be reviewed and approved by

Page 57 of 222 ends
Page 46 of 137 ends

the relevant agency. If the District or City do not have in-house expertise to review the CRMDP, they shall respectively hire an expert who meets the SOI Professional Qualification Standards (36 CFR 61) and the project proponent shall pay for said expert.

The District’s CRMDP review shall ensure that appropriate procedures to monitor construction and treat unanticipated discoveries are in place. District review and approval of the CRMDP shall occur prior to the commencement of any construction activities subject to the requirements of the CRMDP. The CRMDP shall include required qualifications for archaeological monitors and supervising archaeologists and shall lay out protocols to be followed in relation to cultural resources, including both archaeological and tribal cultural resources. The CRMDP shall provide a summary of sensitivity for buried cultural resources. In addition, it shall describe the roles and responsibilities of archaeological and Native American monitors, District personnel (as applicable), City personnel (as applicable), and construction personnel. Additionally, the CRMDP shall describe specific field procedures to be followed for archaeological monitoring, including field protocol and methods to be followed should there be an archaeological discovery. Evaluation of resources; consultation with Native American individuals, tribes, and organizations; treatment of cultural remains and artifacts; curation; and reporting requirements shall also be described. The CRMDP shall also delineate the requirements, procedures, and notification processes in the event human remains are encountered.

The CRMDP shall delineate the area(s) of archaeological sensitivity that require archaeological monitoring. Mapping of the area(s) shall be made available to the project proponent, who shall incorporate this information into the respective construction specifications for the Balanced Plan Component, GB Capital Component, Pasha Rail Improvement Component, Pasha Road Closures Component, and Bayshore Bikeway Component.

MM-CUL-3: Prepare and Implement a Cultural Resources Awareness Training Prior to Project Construction (Balanced Plan, GB Capital Component, Pasha Rail Improvement Component, Pasha Road Closures Component, and Bayshore Bikeway Component). Prior to, and for the duration of, project-related ground disturbance in the areas east of the mean high tide line and south of Bay Marina Drive, the Balanced Plan, GB Capital Component, Pasha Rail Improvement Component, Pasha Road Closures Component, and Bayshore Bikeway Component respective project proponent shall hire a qualified archaeologist who meets the SOI Professional Qualifications Standards (36 CFR 61) and is approved by the District for components within its jurisdiction, and the City for components within its jurisdiction, to provide cultural resources awareness training to project construction personnel. The training shall include a discussion of applicable laws and penalties under the law; samples or visual representations of artifacts that might be found in the project vicinity; and the steps that must be taken if cultural resources are encountered during construction, including the authority of archaeological monitors, if required to be on site during the project, to halt

Page 58 of 222 ends
Page 47 of 137 ends

construction in the area of a discovery. A hard copy summary of cultural resource laws, discovery procedures, and contact information shall be provided to all construction workers. Completion of the training shall be documented for all construction personnel, who shall be required to sign a form confirming they have completed the training. The form shall be retained by the project proponent to demonstrate compliance with this mitigation measure.

MM-CUL-4: Conduct Archaeological Monitoring in Areas of Sensitivity (Balanced Plan, GB Capital Component, Pasha Rail Improvement Component, Pasha Road Closures Component, and Bayshore Bikeway Component). Within the areas of the Balanced Plan, GB Capital Component, Pasha Rail Improvement Component, Pasha Road Closures Component, and Bayshore Bikeway Component east of the mean high tide line and south of Bay Marina Drive, the project proponent shall retain a qualified archaeologist(s) who meets the SOI Professional Qualifications Standards as promulgated in 36 CFR 61. The qualified archaeologist(s) shall supervise archaeological monitoring of all proposed ground-disturbing activities for the project in the archaeologically sensitive portion(s) of the project site. The archaeologically sensitive portion(s) of the project site is defined as land-based ground-disturbing activities associated with project components east of the mean high tide line and south of Bay Marina Drive. Monitoring actions and procedures shall be completed per the CRMDP described in MM-CUL-2.

MM-CUL-5: Conduct Native American Monitoring in Areas of Sensitivity (Balanced Plan, GB Capital Component, Pasha Rail Improvement Component, Pasha Road Closures Component, and Bayshore Bikeway Component). A Kumeyaay Native American monitor shall be present at all areas designated for archaeological monitoring—defined as land-based ground-disturbing activities associated with the portions of the Balanced Plan, GB Capital Component, Pasha Rail Improvement Component, Pasha Road Closures Component, and Bayshore Bikeway Component that are east of the mean high tide line and south of Bay Marina Drive.

This monitoring shall occur on an as-needed basis and is intended to ensure that Native American concerns are considered during the construction process. Native American monitors shall be retained from tribes who have expressed an interest in the project and have participated in discussions with the District. If a tribe has been notified of scheduled construction work and does not respond, or if a Native American monitor is not available, work may continue without the Native American monitor. Roles and responsibilities of the Native American monitors shall be detailed in the CRMDP described in mitigation measure MM-CUL-2. Costs associated with Native American monitoring shall be borne by the project proponent.

After implementation of mitigation measures MM-CUL-2 through MM-CUL-5, Impact-CUL-2 would be reduced to a less-than-significant level because the preparation and implementation of a Cultural Resources Monitoring and Discovery Plan and Cultural Resources Awareness Training, as well as archaeological and Native American monitoring of any ground-disturbing activities on designated

Page 59 of 222 ends
Page 48 of 137 ends

portions of the project site, would minimize the potential to damage, or result in the loss of, unknown subsurface archaeological resources.

4.4.2 Impact-CUL-3: Excavation Related to the Proposed Project Would Potentially Damage Tribal Cultural Resources (Balanced Plan, GB Capital Component, Pasha Rail Improvement Component, Pasha Road Closures Component, Bayshore Bikeway Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on tribal cultural resources (Impact-CUL-3) resulting from inadvertently unearthing significant unknown tribal cultural resources during ground-disturbing construction activities in areas of archaeological sensitivity. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.4, Cultural Resources, Tribal Cultural Resources, and Paleontological Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on cultural resources, tribal cultural resources, and paleontological resources identified as Impact-CUL3 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on tribal cultural resources (Impact-CUL-3) is analyzed in Volume 2 (Final EIR), Section 4.4, Cultural Resources, Tribal Cultural Resources, and Paleontological Resources. Potential Impact-CUL-3 would result from inadvertently damaging or destroying significant unknown tribal cultural resources during ground-disturbing construction activities in areas of archaeological sensitivity (defined as the area east of the mean high tide line and south of Bay Marina Drive).

The potentially significant impact on tribal cultural resources (Impact-CUL-3) would be reduced to below a level of significance by mitigation measures MMCUL-2: Prepare and Implement a Cultural Resources Monitoring and Discovery Plan, MM-CUL-3: Prepare and Implement a Cultural Resources Awareness Training Prior to Project Construction, MM-CUL-4: Conduct Archaeological Monitoring in Areas of Sensitivity, and MM-CUL-5: Conduct Native American Monitoring in Areas of Sensitivity. These mitigation measures are set forth in full above and in the MMRP and Table 2-3 in the Executive Summary of the Final EIR.

After implementation of mitigation measures MM-CUL-2 through MM-CUL-5, Impact-CUL-3 would be reduced to a less-than-significant level because the preparation and implementation of a Cultural Resources Monitoring and Discovery Plan and Cultural Resources Awareness Training, as well as archaeological and Native American monitoring of any ground-disturbing activities on designated portions of the project site, would minimize the potential to for damage or loss of unknown tribal cultural resources.

Page 60 of 222 ends
Page 49 of 137 ends

4.4.3 Impact-CUL-4: Excavation Related to the Proposed Project Would Potentially Disturb Buried Paleontological Resources (City Program – Development Component, Bayshore Bikeway Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on paleontological resources (Impact-CUL-4) related to the excavation for the proposed project at the City Program – Development Component and portions of the proposed Bayshore Bikeway Component. Detailed information and analysis regarding this potentially significant impact is provided in Volume 2 (Final EIR), Section 4.4, Cultural Resources, Tribal Cultural Resources, and Paleontological Resources.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effect on cultural resources, tribal cultural resources, and paleontological resources identified as Impact-CUL4 in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on paleontological resources (Impact-CUL-4) is analyzed in Volume 2 (Final EIR), Section 4.4, Cultural Resources, Tribal Cultural Resources, and Paleontological Resources. Potential Impact-CUL-4 has the potential to result from excavation in excess of 1,000 cubic yards and to depths greater than 10 feet, which could directly or indirectly impact a unique paleontological resource or site.

The potentially significant impact on paleontological resources (Impact-CUL-4) would be reduced to below a level of significance by mitigation measure MMCUL-6: Conduct Paleontological Monitoring in Areas of Sensitivity. This mitigation measure is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provides as follows:

MM-CUL-6: Conduct Paleontological Monitoring in Areas of Sensitivity (City Program – Development Component, Bayshore Bikeway Component). A qualified paleontologist meeting the Society for Vertebrate Paleontology qualifications (retained by the respective project proponent and pre-approved by the District or City as applicable) shall review the paleontological records search prepared by the San Diego Natural History Museum to confirm the locations of paleontologically sensitive areas as well as the existing literature for the proposed project area. The following monitoring measures shall be implemented to recover remains before they are lost or destroyed.
• Where highly sensitive fossil-bearing deposits are likely to be affected and the proposed construction methodology allows for the recovery of fossils, then paleontological monitoring shall be incorporated into the project specifications.
• A qualified paleontologist shall attend preconstruction meetings to consult with the grading and excavation contractors concerning excavation schedules, paleontological field techniques, and safety issues. A qualified paleontologist is defined as an individual with an M.S. or Ph.D. in

Page 61 of 222 ends
Page 50 of 137 ends

paleontology or geology who is familiar with paleontological procedures and techniques, who is knowledgeable in the geology and paleontology of San Diego County, and who has worked as a paleontological monitoring project supervisor in the county for at least 1 year.
• A paleontological monitor shall be on site on a full-time basis during the original cutting of previously undisturbed deposits of high-sensitivity formations to inspect exposures for contained fossils. The paleontological monitor shall work under the direction of the qualified paleontologist. A paleontological monitor is defined as an individual who has experience in the collection and salvage of fossil materials.
• If fossils are discovered, the paleontologist (or paleontological monitor) shall recover them. In most cases, this fossil salvage can be completed in a short period of time; however, some fossil specimens, such as a complete large mammal skeleton, may require an extended salvage period. In these instances the paleontologist (or paleontological monitor) shall be allowed to temporarily direct, divert, or halt grading to allow recovery of fossil remains in a timely manner. Because of the potential for the recovering of small fossil remains, such as isolated mammal teeth, it may be necessary to set up a screen-washing operation on site.
• Fossil remains collected during the monitoring and salvage portion of the program shall be cleaned, repaired, sorted, and catalogued. • Prepared fossils, along with copies of all pertinent field notes, photos, and maps, shall be deposited (as a donation) in a scientific institution with permanent paleontological collections, such as the San Diego Natural History Museum. Donation of the fossils by the project proponent shall be accompanied by financial support for initial specimen storage. • A final data recovery report shall be completed that outlines the results of the monitoring program. This report shall include discussions of the methods used, stratigraphic section(s) exposed, fossils collected, and significance of recovered fossils.

After implementation of mitigation measure MM-CUL-6, Impact-CUL-4 would be reduced to a less-than-significant level because the recommended monitoring of any ground-disturbing activities in areas of paleontological sensitivity would minimize the potential to directly or indirectly destroy a unique paleontological resource or site or a unique geologic feature.

4.5 Energy

4.5.1 Impact-EN-1: Potential Wasteful, Inefficient, or Unnecessary Consumption of Energy Resources During Construction (Balanced Plan, Bayshore Bikeway Component, GB Capital Component, Pasha Rail Improvement, Pasha Road Closures Component, and City Program – Development Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on energy (Impact-EN-1) due to the potential wasteful, inefficient, or unnecessary

Page 62 of 222 ends
Page 51 of 137 ends

consumption of energy resources during construction of the proposed project.

Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.5, Energy.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on energy (Impact-EN-1) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on energy (Impact-EN-1) is analyzed in Volume 2 (Final EIR), Section 4.5, Energy. Potential Impact-EN-1 would result from the potential wasteful, inefficient, or unnecessary consumption of energy resources during construction.

The potentially significant impact on energy (Impact-EN-1) will be reduced to below a level of significance by mitigation measures MM-GHG-1: Implement DieselReduction Measures During Project Construction and Operation, MM-GHG-2:

Comply with District CAP Measures, MM-GHG-3: Comply with the Applicable City CAP Measures, MM-GHG-4: Implement Diesel Emission-Reduction Measures During Project Waterside Construction Activities, MM-GHG-5: Implement Electric Heating and Zero-Net-Energy Buildings, MM-GHG-6: Implement a Renewable Energy Project On Site, or Other Verifiable Actions or Activities on Tidelands or Within Offsite Tidelands, or Within another Adjacent Member City, or Purchase the Equivalent GHG Offsets from a CARB-Approved Registry or a Locally Approved Equivalent Program, MM-GHG-7: Implement a Renewable Energy Project On Site, or Other Verifiable Actions or Activities Within National City or Within an Adjacent Community, or Purchase the Equivalent GHG Offsets from a CARB-Approved Registry or a Locally Approved Equivalent Program, and MM-AQ-5 Use Modern Harbor Craft During Construction Activities. These measures are discussed in detail and set forth in full in Section 4.2, Air Quality and Health Risk, and Section

4.6, Greenhouse Gas Emissions and Climate Change, of Volume 2 of the EIR and are incorporated herein by this reference. These mitigation measures also are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR.

MM-GHG-1 would help ensure that the use of diesel-operated vehicles during construction would not be wasteful. MM-GHG-2 and MM-GHG-3 (applies to the City Program Component) would require several sustainability measures to help ensure the project would reduce energy demand and avoid inefficient use of energy resources. MM-GHG-4 would require use of modern harbor craft for waterside construction activities. MM-GHG-5 would require all development to meet the state’s draft zero net energy standards, if and when adopted as part of the California Building Code, and for the City and the District to encourage project developers to construct all-electric buildings. MM-GHG-6 and MM-GHG-7 would require project proponents to incorporate renewable energy and/or the purchase of an equivalent of greenhouse gas (GHG) offsets at the time of future design. MMAQ-5 would require the GB Capital Component to use modern harbor craft during construction to reduce emissions. Implementation of mitigation measures MMGHG-1 through MM-GHG-7, and MM-AQ-5, would reduce potential impacts

Page 63 of 222 ends
Page 52 of 137 ends

related to the wasteful, inefficient, and unnecessary consumption of energy (Impact-EN-1) to less-than-significant levels.

4.5.2 Impact-EN-2: Potential Wasteful, Inefficient, or Unnecessary Consumption of Energy Resources During Operation (Balanced Plan, GB Capital Component, and City Program – Development Component) Potentially Significant Impact: The EIR identifies a potentially significant impact on energy (Impact-EN-2) due to the potential wasteful, inefficient, or unnecessary consumption of energy resources during operation of the proposed project.

Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.5, Energy.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on energy (Impact-EN-2) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on energy (Impact-EN-2) is analyzed in Volume 2 (Final EIR), Section 4.5, Energy. Potential Impact-EN-2 would result from the potential wasteful, inefficient, or unnecessary consumption of energy resources during operation.

The potentially significant impact on energy (Impact-EN-2) will be reduced to below a level of significance by mitigation measures MM-GHG-1: Implement DieselReduction Measures During Project Construction and Operation, MM-GHG-2:

Comply with District CAP Measures, MM-GHG-3: Comply with the Applicable City CAP Measures, MM-GHG-5: Implement Electric Heating and Zero-Net-Energy Buildings, MM-GHG-6: Implement a Renewable Energy Project On Site, or Other Verifiable Actions or Activities on Tidelands or Within Offsite Tidelands, or Within another Adjacent Member City, or Purchase the Equivalent GHG Offsets from a CARB-Approved Registry or a Locally Approved Equivalent Program, and MMGHG-7: Implement a Renewable Energy Project On Site, or Other Verifiable Actions or Activities Within National City or Within an Adjacent Community, or Purchase the Equivalent GHG Offsets from a CARB-Approved Registry or a Locally Approved Equivalent Program, . These measures also are discussed in detail in Section 4.6, Greenhouse Gas Emissions and Climate Change, of Volume 2 of the EIR and are incorporated herein by this reference. These mitigation measures also are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR.

MM-GHG-1 would help ensure that the use of diesel-operated vehicles during construction would not be wasteful. MM-GHG-2 and MM-GHG-3 (applies to the City Program Component) would require several sustainability measures to help ensure the project would reduce energy demand and avoid inefficient use of energy resources. MM-GHG-5 would require all development to meet the state’s draft zero net energy standards, if and when adopted as part of the California Building Code, and for the City and the District to encourage project developers to

Page 64 of 222 ends
Page 53 of 137 ends

construct all-electric buildings. MM-GHG-6 and MM-GHG-7 would require project proponents to incorporate renewable energy and/or the purchase of an equivalent of greenhouse gas (GHG) offsets at the time of future design. Implementation of mitigation measures MM-GHG-1 through MM-GHG-3 and MM-GHG-5 through MM-GHG-7 would reduce potential impacts related to the wasteful, inefficient, and unnecessary consumption of energy (Impact-EN-2) to less-than-significant levels.

4.5.3 Impact-EN-3: Potential Inconsistency with Applicable Energy Use Reduction Plans (All Project Components)
Potentially Significant Impact: The EIR identifies a potentially significant impact on energy (Impact-EN-3) due to the project’s potential inconsistency with applicable energy use reduction plans. Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.5, Energy.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on energy (Impact-EN-3) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on energy (Impact-EN-3) is analyzed in Volume 2 (Final EIR), Section 4.5, Energy. Potential Impact-EN-3 would result from the project’s potential inconsistency with the District’s Climate Action Plan (CAP) and the City’s CAP, since the project does not include measures specific to either CAP. The potentially significant impact on energy (Impact-EN-3) will be reduced to below a level of significance by mitigation measures MM-GHG-2: Comply with District CAP Measures and MM-GHG-3: Comply with the Applicable City CAP Measures. These measures are discussed in detail and set forth in full in Section 4.6, Greenhouse Gas Emissions and Climate Change, of Volume 2 of the EIR and are incorporated herein by this reference. These mitigation measures also are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR.

Mitigation measure MM-GHG-2 is designed to ensure that the District’s CAP measures will be incorporated into the Balanced Plan, GB Capital Component, Pasha Rail Improvement Component, Bayshore Bikeway Component [Only Area within District Jurisdiction]). Mitigation measure MM-GHG-3 is designed to ensure that applicable City CAP measures will be incorporated into the City Program – Development Component. Implementation of MM-GHG-2 and MM-GHG-3 would ensure compliance with the District’s CAP and the City’s CAP, respectively, and would reduce Impact-EN-3 to less-than-significant levels.

Page 65 of 222 ends
Page 54 of 137 ends

4.6 Greenhouse Gas Emissions and Climate Change

4.6.1 Impact-GHG-1: Inconsistency with District and City Climate Action Plan Numerical Targets (All Project Components)
Potentially Significant Impact: The EIR identifies a potentially significant impact on greenhouse gas emissions (GHG) and climate change (Impact-GHG-1) because the project construction and operations would not meet efficiency targets in 2025 or 2050 and therefore the project would be inconsistent with the District and City CAPs. Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.6, Greenhouse Gas Emissions and Climate Change.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on GHG emissions and climate change (Impact-GHG-1) as identified in the EIR. However, it cannot be stated with certainty that such measures would reduce the significant effects to a level below significance and a Statement of Overriding Considerations pursuant to State CEQA Guidelines §15093 is required.

Facts in Support of Finding: The potentially significant impact of the proposed project on GHG emissions and climate change (Impact-GHG-1) is analyzed in Volume 2 (Final EIR), Section 4.6, Greenhouse Gas Emissions and Climate Change. Potential Impact-GHG-1 would result from the project’s potential inconsistency with the District’s Climate Action Plan (CAP) and the City’s CAP, since the project construction and operations would not meet numerical efficiency targets in 2025 or 2050.

The potentially significant impact on GHG emissions and climate change (ImpactGHG-1) would require the following mitigation measures to be implemented: MMGHG-1: Implement Diesel Emission-Reduction Measures During Project Construction and Operation, MM-GHG-2: Comply with District CAP Measures, MM-GHG-3: Comply with the Applicable City CAP Measures, MM-GHG-4: Use Modern Harbor Craft for Waterside Construction Activities, MM-GHG-5: Implement Electric Heating and Zero-Net-Energy Buildings, MM-GHG-6: Implement a Renewable Energy Project Onsite, or Other Verifiable Actions or Activities on Tidelands or Within Another Adjacent Member City, or Purchase the Equivalent GHG Offsets from a CARB–Approved Registry or a Locally Approved Equivalent Program, and MM-GHG-7: Implement a Renewable Energy Project On Site, or Other Verifiable Actions or Activities Within National City or Within an Adjacent Community, or Purchase the Equivalent GHG Offsets from a CARB–Approved Registry or a Locally Approved Equivalent Program. These measures are discussed in detail in Section 4.6, Greenhouse Gas Emissions and Climate Change, of Volume 2 of the EIR and are incorporated herein by this reference These mitigation measures are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provide as follows:

Page 66 of 222 ends
Page 55 of 137 ends

MM-GHG-1: Implement Diesel Emission-Reduction Measures During Project Construction and Operation (All Project Components). The project proponent/operator and/or its contractor(s) for each component of the proposed project shall implement the following measures during project construction and operation and, where specified below, submit reports demonstrating compliance for review and approval to the District’s Development Services Department (or successor department) for project components in the District’s jurisdiction or the City’s Community Development Department for project components in the City’s jurisdiction.

1. Construction:
a. The project proponent shall verify that all construction equipment is maintained and properly tuned, in accordance with manufacturers’ specifications.

Prior to the commencement of construction activities using diesel-powered vehicles or equipment, the project proponent shall verify that all vehicles, as well as equipment, have been checked by a certified mechanic and determined to be running in proper condition prior to admittance into the delivery driveway and loading areas. The project proponent shall submit a report prepared by the certified mechanic regarding the construction vehicles’ and equipment’s compliance with this requirement to the District’s Development Services Department (or successor department) or the City’s Community Development Department prior to commencement of their use.
b. The project proponent shall limit all construction truck idling times by shutting down trucks when not in use and reducing the maximum idling time to less than 3 minutes. The project proponent shall install clear signage regarding the limitation on idling time at the construction entrance(s) and shall submit monthly reports of violators to the District. Repeat violators shall be subject to penalties pursuant to the California Airborne Toxics Control Measure, 13 CCR Section 2485. c. Prior to commencing construction activities, the project proponent shall ensure that all off-road construction equipment shall meet the following criteria: (I) For all construction between 2020 and 2025, ensure all equipment is Tier 3 or better (cleaner); (ii) For all construction after 2025, ensure all equipment is alternatively fueled or electrically powered. If alternatively fueled or electrically powered equipment that emits fewer emissions than Tier 4 or better (cleaner) equipment is not available, then the project proponent shall ensure all equipment is Tier 4 or better; and (iii) Use renewable diesel fuel in all heavy-duty, off-road diesel-fueled equipment. Renewable diesel must meet the most recent ASTM D975 specification for ultra-low-sulfur diesel and have a carbon intensity no greater than 50% of diesel with the lowest carbon intensity among petroleum diesel fuels sold in California.

2. Operation: The project proponent shall limit all delivery truck idling times by shutting down trucks when not in use and reducing the maximum idling time to less than 3 minutes. The project proponent shall install clear signage regarding the limitation on idling time at the delivery driveway and loading areas and shall submit annual reports of violators to the District. This measure shall be implemented by

Page 67 of 222 ends
Page 56 of 137 ends

the hotel and marina supervisors. Repeat violators shall be subject to penalties pursuant to the California Airborne Toxics Control Measure, 13 CCR Section 2485.

MM-GHG-2: Comply with District CAP Measures (Balanced Plan, GB Capital Component, Pasha Rail Improvement Component, Bayshore Bikeway Component [Only Area within District Jurisdiction]). Prior to approval of the final design plans, the project proponent/operator and/or its contractor(s) for each component of the proposed project shall list all applicable GHG-reducing measures from the District CAP and demonstrate in the plans where the measures shall be located. A report demonstrating compliance shall be submitted to the District’s Development Services Department (or successor department). Buildings associated with the proposed project components shall achieve certification under the Leadership in Energy and Environmental Design (LEED) program, or the Green Building Rating Systems of the Green Building Certification Institute, or achieve equivalent efficiency if it is determined that LEED certification cannot be achieved because of site factors or other reasons. For construction where LEED or an equivalent program or efficiency certification is not applicable (e.g., dry boat storage), all other applicable measures below shall be required, subject to verification of the District’s Development Services Department (or successor department). The following is a list of the proposed sustainability measures that would be consistent with the District CAP. Any measures selected shall be required and incorporated into the Coastal Development Permit for each project component.
• General Measures
o No commercial drive-through shall be implemented.
• Water
o Indoor water consumption shall be reduced to a level 20% lower than that of the baseline buildings (defined by LEED as indoor water use after meeting Energy Policy Act of 1992 fixture performance requirements) through use of low-flow fixtures in all administrative and common-area bathrooms.
o Plantings with low water requirements and drip irrigation shall be installed, and domestic water demand from the City system for landscaping purposes shall be minimized.
• Waste
o Compliance with AB 939 shall be mandatory and shall include recycling at least 50% of solid waste; recycling of demolition debris shall be mandatory and shall include recycling at least 65% of all construction and demolition debris. This measure shall be applied during construction and operation of the proposed project.
o All commercial, restaurant, and retail uses shall recycle, compost food waste and other organics, and use reusable products instead of disposable products to divert solid waste from the landfill stream.

Page 68 of 222 ends
Page 57 of 137 ends

o Recycled, regional, and rapidly renewable materials shall be used where appropriate during project construction.
• Energy
o Renewable energy design features that may be implemented are as follows:
 Implement onsite renewable energy to new buildings, unless the system cannot be built because of structural and operational constraints. (Evidence must be provided if not feasible, subject to District concurrence.)
 Install co-generation systems (i.e., combined heat and power systems) in new buildings constructed at the project site.  Ensure that, at a minimum, 6% of parking spaces are equipped with electric-vehicle charging stations.
 For all construction after 2025, ensure all construction vehicles and equipment are alternatively fueled or electrically powered, to the extent feasible and available. (GB Capital Component and Balanced Plan only)
 For all construction, use renewable diesel fuel in all heavy-duty, off-road diesel-fueled equipment. Renewable diesel must meet the most recent ASTM D975 specification for ultra-low-sulfur diesel and have a carbon intensity no greater than 50% of diesel with the lowest carbon intensity among petroleum diesel fuels sold in California. (GB Capital Component and Balanced Plan only)
 Construct buildings that are ZNE or, if full ZNE is infeasible, implement all feasible measures identified in the feasibility analysis. (GB Capital and Balanced Plan only)
 Incorporate renewable energy (a) on the project site, (b) within the District’s jurisdiction, or (c) within the adjacent community or member city outside of the District’s jurisdiction. Undertake other verifiable actions or activities on tidelands approved by the District, such as electrification of equipment, including vehicles and trucks; financial contribution to a future local or GHG emission reduction program on tidelands; or similar activities or actions that reduce operational GHG emissions. (GB Capital and Balanced Plan only)
o Energy-efficiency design features that exceed 2019 Title 24 California Building Energy Efficiency Standards shall be incorporated. The measures that may be implemented are as follows:
 Use only fluorescent lights, light-emitting diodes (LEDs), compact fluorescent lights, or the most energy-efficient lighting that meets

Page 69 of 222 ends
Page 58 of 137 ends

required lighting standards and is commercially available. This measure also requires replacement of existing lighting on the project site if not already highly energy efficient.
 Install occupancy sensors for all vending machines in new buildings at the project site.
 Install high-performance glazing with a low solar heat-gain coefficient value that reduces the amount of solar heat allowed into the building, without compromising natural illumination.  Install increased insulation.
 Install cool roofs with an R value of 30 or better.
 Install sun shading devices as appropriate.
 Install high-efficiency heating, ventilating, and air-conditioning systems and controls.
 Install programmable thermostats.
 Install variable frequency drives.
 Install Energy Star–rated appliances.
 Install shore power capabilities where suitable upgrades are feasible in marinas.
• Mobile Sources
o Implement a construction transportation demand management plan for each project component that promotes ride-sharing, vanpooling, alternate work schedules, and offsite parking with shuttles and provides subsidies for transit passes to reduce worker trips and parking demand, which provides incentives for using alternative modes of transportation instead of individual vehicles.
o Implement an operational transportation demand management plan for each project component that requires mandatory employer commuting measures, such as carpooling, transit subsidies, and vanpools, to reduce worker trips and parking demand, which provides incentives for using alternative modes of transportation instead of individual vehicles. o Ensure that bicycle parking is included in the project design. The number of spaces shall be, at a minimum, 5% of the new automobile parking spaces.
• Carbon Sequestration and Land Use
o Install trees and shrub planters throughout the project area as part of the landscape plan.

MM-GHG-3: Comply with the Applicable City CAP Measures (City Program – Development Component). Prior to approval of the final design plans, the project

Page 70 of 222 ends
Page 59 of 137 ends

proponent/operator and/or its contractor(s) for the City Program – Development Component shall list all GHG-reducing measures from the City’s CAP and demonstrate in the plans where these measures shall be located. A report demonstrating compliance shall be submitted to the City’s Community Development Department. Buildings associated with the proposed project component shall achieve certification under the LEED program, or the Green Building Rating Systems of the Green Building Certification Institute, or achieve equivalent efficiency if it is determined that LEED certification cannot be achieved because of site factors or other reasons. The following is a list of proposed sustainability measures from the City CAP that shall be required and incorporated into the Coastal Development Permit for the City Program – Development Component:
• Incorporate energy-efficiency design features that exceed 2019 Title 24 California Building Energy Efficiency Standards.
• Prioritize parking for high-occupancy vehicles as well as carpooling, vanpooling, and transit vehicles.
• Ensure that at a minimum 6% of parking spaces are equipped with electricvehicle charging stations. • Ensure that bicycle parking is included in the project design. The number of spaces shall be, at a minimum, 5% of the new automobile parking spaces. • Encourage telework programs and alternative work schedules for new businesses.
• Provide financial incentives for commuters to reduce the number of vehicle trips by walking, bicycling, using public transit, and carpooling. • Implement programs to reduce, reuse, and recycle construction and demolition waste.
• Encourage rooftop gardens for flat-roofed commercial buildings. • Pursue a pump-efficiency cycling schedule.
• Adopt water efficiency principles similar to the Ahwahnee Water Principles for Resource Efficient Land Use (available at
https://www.lgc.org/wordpress/docs/ahwahnee/ahwahnee_water_principle s.pdf), such as the following:
o Use compact, mixed-use, walkable, and transit-oriented community designs;
o Preserve and restore natural resources such as wetlands, floodplains, recharge zones, riparian areas, open spaces, and native habitats;

Page 71 of 222 ends
Page 60 of 137 ends

o Utilize water holding areas such as creek beds, recessed athletic fields, ponds, cisterns, and other features that serve to recharge groundwater, reduce runoff, improve water quality, and decrease flooding;
o Use low-water plantings in landscaping;
o Use permeable surfaces for hardscapes;
o Install dual plumbing that allows reuse of gray water; o Maximize use of recycled water in the project design; o Use low-flow toilets, efficient clothes washers, and efficient waterusing industrial equipment in new construction; and o Maximize the use of drought-proof water supplies, such as groundwater treatment and brackish water desalination.
• Install trees and shrub planters throughout the project area as part of the landscape plan.

MM-GHG-4: Use Modern Harbor Craft for Waterside Construction Activities (GB Capital Component). Prior to commencing any waterside construction or activities the project proponent/operator and/or its contractor(s) for the GB Capital Component shall ensure that any harbor craft, including, but not limited to, tugboats, pusher tugs, tow boats, work boats, crew boats, and supply boats for use during the duration of any in-water work, shall meet the following criteria:
• For all construction between 2020 and 2025, ensure all equipment is Tier 3 or better (cleaner);
• For all construction after 2025, ensure all equipment is alternatively fueled or electrically powered. If alternatively fueled or electrically powered equipment that emits fewer emissions than Tier 4 or better (cleaner) equipment is not available, then the project proponent shall ensure all equipment is Tier 4 or better; and
• Use renewable diesel fuel in all heavy-duty, off-road diesel-fueled equipment. Renewable diesel must meet the most recent ASTM D975 specification for ultra-low-sulfur diesel and have a carbon intensity no greater than 50% of diesel with the lowest carbon intensity among petroleum diesel fuels sold in California.

If clean harbor craft are not available within 200 miles of the project site for the duration of all dredging activities, the project proponent/operator and/or its contractor(s) for the GB Capital Component shall prioritize the use of equipment that is maintained and properly tuned in accordance with manufacturers’ specifications. The project proponent/operator and/or its contractor(s) for the GB Capital Component shall document and submit evidence to the District’s Development Services Department (or successor

Page 72 of 222 ends
Page 61 of 137 ends

department) or the City’s Community Development Department, depending upon the jurisdiction that the project component is located in, prior to commencement of waterside construction activities. Regardless of the equipment used, the project proponent/ operator and/or its contractor(s) for each project component with waterside construction activities shall verify that all equipment has been checked by a mechanic experienced with such equipment and determined to be running in proper condition prior to admittance into the construction area. The project proponent/operator and/or its contractor(s) for each project component with waterside construction activities shall submit a report prepared by the mechanic experienced with such equipment regarding the condition of the vehicles and equipment for construction and operations to the District’s Development Services Department (or successor department) or the City’s Community Development Department, depending upon the jurisdiction that the project component is located in, prior to commencement of their use.

MM-GHG-5: Implement Electric Heating and Zero-Net-Energy Buildings (GB Capital Component, Balanced Plan, City Program – Development Component).

The City and the District shall require all development to meet the state’s ZNE standards, if and when adopted as part of the California Building Code. In addition, the City and the District shall encourage project developers to construct buildings that are ZNE. Prior to issuance of any Coastal Development Permit or City-issued permit, as applicable, the project proponents/operators and/or its contractor(s) shall submit a feasibility analysis, prepared by a qualified consultant, regarding the construction of buildings as ZNE, and the project component shall implement all feasible measures identified in the feasibility analysis (e.g., electric heating). Prior to implementation of all feasible measures, this report shall be submitted to the District for review and approval for the GB Capital Component (all phases) and Balanced Plan, and submitted to verification the City for review and approval for the City Program – Development Component.

MM-GHG-6: Implement a Renewable Energy Project Onsite, or Other Verifiable Actions or Activities on Tidelands or Within Another Adjacent Member City, or Purchase the Equivalent GHG Offsets from a CARB–Approved Registry or a Locally Approved Equivalent Program (GB Capital Component and Balanced Plan).

A. Options for Reducing GHG Emissions.

To reach the numerical efficiency metric, each project proponent shall, in order of preference, considering availability of structures and feasibility, implement the following, which may be combined with consideration to the preference described below:

1. Incorporate renewable energy
a) On the project site,
b) Within the District’s jurisdiction, or

Page 73 of 222 ends
Page 62 of 137 ends

c) Within the adjacent community or member city outside of the District’s jurisdiction.

2. Undertake other verifiable actions or activities on tidelands approved by the District, such as electrification of equipment, including vehicles and trucks; financial contribution to a future local or GHG emission reduction program on tidelands; or similar activities or actions that reduce operational GHG emissions;

3. Purchase GHG emission offset credits that (1) are real, additional, permanent, quantifiable, verifiable, and enforceable, as specified in California Health and Safety Code Section 38562(d)(1) and (2) and further defined in CCR Title 17, Section 95802 (see below); (2) use a protocol consistent with or as stringent as CARB protocol requirements under CCR Title 17, Section 95972(a); and (3) are issued by an CARB-approved offset registry. For offset credits from projects outside California, the project proponent must demonstrate in writing to the satisfaction of the District that the offset project meets requirements equivalent to or stricter than California’s laws and regulations, ensuring the validity of offset credits.

For purposes of this section, the definitions are as follows:
a) “Real” means, in the context of offset projects, that GHG reductions or GHG enhancements result from a demonstrable action or set of actions and are quantified using appropriate, accurate, and conservative methodologies that account for all GHG emissions sources, GHG sinks, and GHG reservoirs within the offset project boundary and account for uncertainty and the potential for activity-shifting leakage and market-shifting leakage. [17 CCR 95802] b) “Additional” means, in the context of offset credits, GHG emission reductions or removals that exceed any GHG reduction or removals otherwise required by law, regulation, or legally binding mandate, and that exceed any GHG reductions or removals that would otherwise occur in a conservative BAU scenario. [17 CCR 95802]
c) “Permanent” means, in the context of offset credits, either that GHG reductions and GHG removal enhancements are not reversible, or when GHG reductions and GHG removal enhancements may be reversible, that mechanisms are in place to replace any reversed GHG emission reductions and GHG removal enhancements to ensure that all credited reductions endure for at least 100 years. [17 CCR 95802] d) “Quantifiable” means, in the context of offset credits, the ability to accurately measure and calculate GHG reductions or GHG removal enhancements relative to a project baseline in a reliable and replicable manner for all GHG emission sources, GHG sinks, or GHG reservoirs included within the offset project boundary while accounting for uncertainty and activity-shifting leakage and market-shifting leakage. [17 CCR 95802]
e) “Verifiable” means that a non-California offset project is located in a state that has laws and regulations equivalent to or stricter as California’s with respect to ensuring the validity of offsets and an Offset Project Data Report assertion is well

Page 74 of 222 ends
Page 63 of 137 ends

documented and transparent such that it lends itself to an objective review by an accredited verification body. [17 CCR 95802]
f) “Enforceable” means the authority for the offset purchaser to hold the offset provider liable and to take appropriate action if any of the above requirements are not met. [Adapted from definition in 17 CCR 95802 for use in this measure.] “Enforceable” also means that the offset must be backed by a legal instrument or contract that defines exclusive ownership and the legal instrument can be enforced within the legal system of the State of California.

B. Required Annual GHG Emissions Reductions: The option(s) implemented pursuant to paragraph A above shall achieve the following required GHG reductions for the activities of the proposed project, assuming full buildout of each project component:
• Balanced Plan (only Pepper Park Expansion) = 836 MTCO2e per year or 4,317 MWh/year.
• GB Capital Component = 6,627 MTCO2e per year or 34,219 MWh/year.

The required reductions may be reduced by the District, based on the actual amount of development and activities associated with that development and the other adjustment provisions specified below.

C. Implementation of GHG Emissions Reduction Options. Prior to becoming operational and annually thereafter, the District shall notify the project proponent of the option(s) available for achieving its respective annual maximum GHG required emissions reduction, as identified in paragraph B above, in the order of priority specified above, and the project proponent(s) shall:

1. Develop a renewable energy project(s) or take other verifiable actions or activities identified by the District to meet or partially meet the required amount of MTCO2e or MWh reductions specified above.
a) If the project proponent develops a renewable energy project(s), or takes other verifiable actions or activities to reduce GHG emissions, the project proponent shall submit to the District’s Planning Department (or successor department, for its review and approval, a report specifying the annual amount of MTCO2e or MWh reduction achieved by the renewable energy project(s), or actions, or activities; submit evidence that the renewable energy project(s), actions, or activities are not being used to offset GHG emissions for any other project or entity; and submit any other information requested by the District’s Planning Department (or successor department), to verify the amount of GHG emissions reduction achieved by the renewable energy project, or actions or activities (collectively, “GHG Emission Reduction Report”).
b) If the GHG Emission Reduction Report is approved by the District, a reduction to the required offsets shall be calculated by the District’s Planning Department (or successor department), and the reduction of offsets shall be transmitted to the project proponent in writing and the amount of GHG reduction shall count toward

Page 75 of 222 ends
Page 64 of 137 ends

the required GHG reduction for the proposed project component (“GHG Reduction”).

2. Purchase GHG emission offsets in conformance with paragraph A(3) above in an amount sufficient to achieve the required reduction of MTCO2e or MWh specified above, which may be decreased by the amount of annual MTCO2e or MWh reduction that is achieved by any renewable energy project(s) or other verifiable action or activities if developed and/or implemented pursuant to paragraph (1) above. The purchase of offsets to achieve the required reduction in MTCO2e or MWh shall occur as follows:
a) Each project component shall purchase offsets for its first 2 years of operation; b) Purchase offsets at least annually thereafter, prior to becoming operational, beginning with the third year of operation, for the life of the proposed project component’s operations or until the termination of a lease agreement (for GB Capital Component only) between the District and the project proponent. The project proponent may purchase more than 1 year of operation emissions offsets, consistent with the amount of MTCO2e or MWh reduction specified above for the corresponding project component.
c) On or before the first year of operation of the respective project proponent and annually thereafter, the project proponent shall submit certificates for offsets purchased to achieve the required GHG emission reductions, including written verification by a qualified consultant approved by the District that the offsets meet the requirements for GHG emission offset credits set forth in paragraph A(3) above, to the District’s Planning Department (or successor department).

D. Adjustments to Required GHG Emissions Reductions.

If the project proponent complies with paragraphs A(1) or A(2) above, in an amount that meets the total amount of MTCO2e or MWh reductions specified above, or complies with paragraph A(3) above and purchases the requisite offsets, or does a combination of paragraphs A(1), (2), and (3) to meet the reduction target, then nothing further shall be required under this mitigation measure.

1. Reduction of Emissions through Development of a Renewable Energy Project Requirement: Although none are identified at this time, the project proponent may be required by the District to develop a renewable energy project at any time during the life of the project (subject to future approvals and the priorities listed above) and may request a reduction of required offsets. If any reduction in offsets is requested by the project proponent because of the development of a renewable energy project(s), the project proponent shall submit a GHG Emission Reduction Report for the District Planning Department’s (or successor department’s) review, pursuant to the process specified above in paragraph C(1) above, and required offsets shall be determined by the District and reduced.

Page 76 of 222 ends
Page 65 of 137 ends

2. Reduction of Emissions through Verifiable Actions or Activities on Tidelands Requirement: Although none are identified at this time, the project proponent may be required by the District to take other verifiable actions or activities at any time during the life of the project (subject to future approvals and the priorities listed above) and may request a reduction of required offsets. If any reduction in offsets is requested by the project proponent because of the other verifiable actions or activities on tidelands, the project proponent shall submit a GHG Emission Reduction Report for the District Planning Department’s (or successor department’s) review pursuant to the process specified above in paragraph C(1), and required offsets shall be determined by the District and reduced.

3. Reduction of Emissions through Purchase of Offsets: Subsequent to purchasing GHG emission offsets pursuant to paragraph C(2) above, the project proponent’s future annual purchase of offsets to achieve the GHG emissions reduction specific in paragraph B above may be adjusted if the development is less than assumed here, which is the following:
• Balanced Plan includes a 2.54-acre park.
• GB Capital Component landside features, including 134 RV sites; 40,000 square feet of dry boat storage; 60 modular cabins; 10,000-square-foot administration/recreation building; 10,000-square-foot building with restrooms, laundry facilities, and staff support services in the vicinity of the existing marina buildings; and a 4,000-square-foot maintenance building and associated approximately 8,200-square-foot maintenance yard northeast of the proposed dry boat storage. Waterside uses include 20 moorings in Sweetwater Channel; 620-foot-long and 8-foot-wide floating dock that includes up to 30 fingers, which accommodate up to 50 boats; and a 580-foot-long and 8-foot-wide dock with two 80-foot-long and 5-footwide gangways within the existing marina basin north of the jetty to accommodate up to 25 smaller boats.

4. The District or a District-retained consultant (at the project proponent cost) shall calculate, using the best available science, the amount of unused GHG reduction offsets, based on the actual development constructed and in operation. Any unused offsets shall be used for the next year of operation of the project component, and the project proponent shall purchase offsets in the necessary amounts (required amount less any unused offsets) for the subject year. This procedure shall be repeated on an annual basis. In the event that newly discovered information shows that an offset, previously certified as compliant pursuant to paragraph C(3)(c), does not comply with the requirements of paragraph A(3), the project proponent shall purchase an equivalent amount of replacement offsets that comply with the requirements of paragraph A(3) within 30 days of receiving notice of the noncompliance. After verification of unused and available offsets, unused offsets may replace previously compliant offsets should those offsets subsequently be determined noncompliant with paragraph A(3). At the project proponent’s written request to the District, the project proponent may waive the annual adjustment described above and purchase the required MTCO2e or MWh offsets

Page 77 of 222 ends
Page 66 of 137 ends

on at least an annual basis.

MM-GHG-7: Implement a Renewable Energy Project On Site, or Other Verifiable Actions or Activities Within National City or Within an Adjacent Community, or Purchase the Equivalent GHG Offsets from a CARB–Approved Registry or a Locally Approved Equivalent Program (City Program – Development Component).

A. Options for Reducing GHG Emissions.

To reach the numerical efficiency metric, each project proponent shall, in order of preference, considering availability of structures and feasibility, implement the following, which may be combined with consideration to the preference described below:

1. Incorporate renewable energy
a) On the project site,
b) Within the City’s jurisdiction, or
c) Within the adjacent community or the city.

2. Undertake other verifiable actions or activities approved by the City, such as electrification of equipment, including vehicles and trucks; financial contribution to a future local or GHG emission reduction program within the city; or similar activities or actions that reduce operational GHG emissions;

3. Purchase GHG emission offset credits that (1) are real, additional, permanent, quantifiable, verifiable, and enforceable, as specified in California Health and Safety Code Section 38562(d)(1) and (2) and further defined in California CCR Title 17, Section 95802 (see below); (2) use a protocol consistent with or as stringent as CARB protocol requirements under CCR Title 17, Section 95972(a); and (3) are issued by an CARB-approved offset registry.7 For offset credits from projects outside California, the project proponent must demonstrate in writing to the satisfaction of the City that the offset project meets requirements equivalent to or stricter than California’s laws and regulations, ensuring the validity of offset credits.

For purposes of this section, the definitions are as follows:
a) “Real” means, in the context of offset projects, that GHG reductions or GHG enhancements result from a demonstrable action or set of actions and are quantified using appropriate, accurate, and conservative methodologies that account for all GHG emissions sources, GHG sinks, and GHG reservoirs within the offset project boundary and account for uncertainty and the potential for activity-shifting leakage and market- shifting leakage. [17 CCR 95802] b) “Additional” means, in the context of offset credits, GHG emission reductions or removals that exceed any GHG reduction or removals otherwise required by law, regulation, or legally binding mandate and that exceed any GHG reductions or removals that would otherwise occur in a conservative BAU scenario. [17 CCR 95802]

Page 78 of 222 ends
Page 67 of 137 ends

c) “Permanent” means, in the context of offset credits, either that GHG reductions and GHG removal enhancements are not reversible, or when GHG reductions and GHG removal enhancements may be reversible, that mechanisms are in place to replace any reversed GHG emission reductions and GHG removal enhancements to ensure that all credited reductions endure for at least 100 years. [17 CCR 95802] d) “Quantifiable” means, in the context of offset credits, the ability to accurately measure and calculate GHG reductions or GHG removal enhancements relative to a project baseline in a reliable and replicable manner for all GHG emission sources, GHG sinks, or GHG reservoirs included within the offset project boundary while accounting for uncertainty and activity-shifting leakage and market-shifting leakage. [17 CCR 95802]
e) “Verifiable” means that a non-California offset project is located in a state that has laws and regulations equivalent to or stricter as California’s with respect to ensuring the validity of offsets and an Offset Project Data Report assertion is well documented and transparent such that it lends itself to an objective review by an accredited verification body. [17 CCR 95802]
f) “Enforceable” means the authority for the offset purchaser to hold the offset provider liable and to take appropriate action if any of the above requirements are not met. [Adapted from definition in 17 CCR 95802 for use in this measure.] “Enforceable” also means that the offset must be backed by a legal instrument or contract that defines exclusive ownership and the legal instrument can be enforced within the legal system of the State of California.

B. Required Annual GHG Emissions Reductions:

The option(s) implemented pursuant to paragraph A above shall achieve the following required GHG reductions for the activities of the proposed project, assuming full buildout of each project component:
• City Program = 3,549 MTCO2e per year or 18,323 MWh/year.

The required reductions may be reduced by the City, based on the actual amount of development and activities associated with that development and the other adjustment provisions specified below.

C. Implementation of GHG Emissions Reduction Options.

Prior to becoming operational and annually thereafter, the City shall notify the project proponent of the option(s) available for achieving its respective annual maximum GHG required emissions reduction, as identified in paragraph B above, in the order of priority specified above, and the project proponent(s) shall:

1. Develop a renewable energy project(s) or take other verifiable actions or activities identified by the City to meet or partially meet the required amount of

Page 79 of 222 ends
Page 68 of 137 ends

MTCO2e or MWh reductions specified above.
a) If the project proponent develops a renewable energy project(s), or takes other verifiable actions or activities to reduce GHG emissions, the project proponent shall submit to the City’s Community Development Department, for its review and approval, a report specifying the annual amount of MTCO2e or MWh reduction achieved by the renewable energy project(s), or actions, or activities; submit evidence that the renewable energy project(s), actions, or activities are not being used to offset GHG emissions for any other project or entity; and submit any other information requested by the City’s Community Development Department to verify the amount of GHG emissions reduction achieved by the renewable energy project, or actions or activities (collectively, “GHG Emission Reduction Report”).
b) If the GHG Emission Reduction Report is approved by the City, a reduction to the required offsets shall be calculated by the City’s Community Development Department, and the reduction of offsets shall be transmitted to the project proponent in writing and the amount of GHG reduction shall count toward the required GHG reduction for the proposed project (“GHG Reduction”).

2. Purchase GHG emission offsets in conformance with paragraph A(3) above in an amount sufficient to achieve the required reduction of MTCO2e or MWh specified above, which may be decreased by the amount of annual MTCO2e or MWh reduction that is achieved by any renewable energy project(s) or other verifiable action or activities if developed and/or implemented pursuant to paragraph (1) above. The purchase of offsets to achieve the required reduction in MTCO2e or MWh shall occur as follows:
a) Each project component shall purchase offsets for its first 2 years of operation; b) Purchase offsets at least annually thereafter, prior to becoming operational, beginning with the third year of operation, for the life of the proposed project component’s operations or until the termination of any lease agreement between the City and the project proponent. The project proponent may purchase more than 1 year of operation emissions offsets, consistent with the amount of MTCO2e or MWh reduction specified above for the corresponding project component. c) On or before the first year of operation of the respective project proponent and annually thereafter, the project proponent shall submit certificates for offsets purchased to achieve the required GHG emission reductions, including written verification by a qualified consultant approved by the City that the offsets meet the requirements for GHG emission offset credits set forth in paragraph A(3) above, to the City’s Community Development Department.

D. Adjustments to Required GHG Emissions Reductions.

Page 80 of 222 ends
Page 69 of 137 ends

If the project proponent complies with paragraphs A(1) or A(2) above, in an amount that meets the total amount of MTCO2e or MWh reductions specified above in the reduction target, or complies with paragraph A(3) above and purchases the requisite offsets, or does a combination of paragraphs A(1), (2), and (3) to meet the reduction target, then nothing further shall be required under this mitigation measure.

1. Reduction of Emissions through Development of a Renewable Energy Project Requirement: Although none are identified at this time, the project proponent may be required by the City to develop a renewable energy project at any time during the life of the project (subject to future approvals and the priorities listed above) and may request a reduction of required offsets. If any reduction in offsets is requested by the project proponent because of the development of a renewable energy project(s), the project proponent shall submit a GHG Emission Reduction Report for the City’s Community Development Department’s review, pursuant to the process specified above in paragraph C(1) above, and required offsets shall be determined by the City and reduced.

2. Reduction of Emissions through Verifiable Actions or Activities in the City of National City Requirement: Although none are identified at this time, the project proponent may be required by the City to take other verifiable actions or activities at any time during the life of the project (subject to future approvals and the priorities listed above) and may request a reduction of required offsets. If any reduction in offsets is requested by the project proponent because of the other verifiable actions or activities on tidelands, the project proponent shall submit a GHG Emission Reduction Report for the City’s Community Development Department’s review pursuant to the process specified above in paragraph C(1), and required offsets shall be determined by the City and reduced.

3. Reduction of Emissions through Purchase of Offsets: Subsequent to purchasing GHG emission offsets pursuant to paragraph C(2) above, the project proponent’s future annual purchase of offsets to achieve the GHG emissions reduction specific in paragraph B above may be adjusted if the development is less than assumed here, which is the following:
• City Program Plan includes a 150-room hotel along with 15,500 square feet of restaurant space and 12,000 square feet of retail space.

4. The City or a City-retained consultant (at the project proponent cost) shall calculate, using the best available science, the amount of unused GHG reduction offsets, based on the actual development constructed and in operation. Any unused offsets shall be used for the next year of operation of the project component, and the project proponent shall purchase offsets in the necessary amounts (required amount less any unused offsets) for the subject year. This procedure shall be repeated on an annual basis. In the event that newly discovered information shows that an offset, previously certified as compliant pursuant to

Page 81 of 222 ends
Page 70 of 137 ends

paragraph C(3)(c), does not comply with the requirements of paragraph A(3), the project proponent shall purchase an equivalent amount of replacement offsets that comply with the requirements of paragraph A(3) within 30 days of receiving notice of the noncompliance. After verification of unused and available offsets, unused offsets may replace previously compliant offsets should those offsets subsequently be determined noncompliant with paragraph A(3). At the project proponent’s written request to the City, the project proponent may waive the annual adjustment described above and purchase the required MTCO2e or MWh offsets on at least an annual basis.

Implementation of MM-GHG-1 through MM-GHG-7 would result in emissions below the numerical target. Mitigation would ensure the project would generally comply with plans, policies, and regulatory programs outlined in the adopted Scoping Plan and those adopted or recommended by CARB or other California agencies for the purpose of reducing the emissions of GHGs. However, because no plans, policies, and regulatory programs have been adopted to achieve the carbon neutrality goal set by Executive Order B-55-18, it cannot be stated with certainty that the project would result in emissions that would represent a fair share of the requisite reductions toward the statewide carbon neutrality goal. Therefore, Impact-GHG-1 would remain significant and unavoidable and a Statement of Overriding Considerations pursuant to State CEQA Guidelines §15093 is required.

4.6.2 Impact-GHG-2: Inconsistency with District Climate Action Plan and Only Partial Consistency with Statewide Greenhouse Gas Reduction Plans, Policies, and Regulatory Programs (Balanced Plan, GB Capital Component, Pasha Rail Improvement Component, Pasha Road Closures Component, Bayshore Bikeway Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on GHG emissions and climate change (Impact-GHG-2) because the project would only partially comply with plans, policies, and regulatory programs outlined in applicable District CAP measures and applicable state reduction goals and plans, policies, or regulations. Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.6, Greenhouse Gas Emissions and Climate Change.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on GHG emissions and climate change (Impact-GHG-2) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on GHG emissions and climate change (Impact-GHG-2) is analyzed in Volume 2 (Final EIR), Section 4.6, Greenhouse Gas Emissions and Climate Change. Potential Impact-GHG-2 would result because the project would only partially comply with plans, policies, and regulatory programs outlined in applicable

Page 82 of 222 ends
Page 71 of 137 ends

City CAP measures and applicable state reduction goals and plans, policies, or regulations for the purpose of reducing GHG emissions.

The potentially significant impact on GHG emissions and climate change (ImpactGHG-2) would require the following mitigation measures to be implemented: MMGHG-1: Implement Diesel Emission-Reduction Measures During Project Construction and Operation, MM-GHG-2: Comply with District CAP Measures, MM-GHG-4: Use Modern Harbor Craft for Waterside Construction Activities, and MM-GHG-5: Implement Electric Heating and Zero-Net-Energy Buildings. These measures are discussed in detail in Section 4.6, Greenhouse Gas Emissions, of Volume 2 of the EIR and are set forth in full above. These mitigation measures also are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR.

Implementation of MM-GHG-1, MM-GHG-2, MM-GHG-4, and MM-GHG-5 would reduce Impact-GHG-2 to less than significant levels because the project would be consistent with the relevant plans, policies, and regulatory programs.

4.6.3 Impact-GHG-3: Inconsistency with City Climate Action Plan and Only Partial Consistency with Statewide Greenhouse Gas Reduction Plans, Policies, and Regulatory Programs (City Program – Development Component, a Portion of the Bayshore Bikeway Component, and a Portion of the GB Capital Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on GHG emissions and climate change (Impact-GHG-3) because the project would only partially comply with plans, policies, and regulatory programs outlined in applicable City CAP measures and applicable state reduction goals and plans, policies, or regulations. Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.6, Greenhouse Gas Emissions and Climate Change.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on GHG emissions and climate change (Impact-GHG-3) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on GHG emissions and climate change (Impact-GHG-3) is analyzed in Volume 2 (Final EIR), Section 4.6, Greenhouse Gas Emissions and Climate Change. Potential Impact-GHG-3 would result because the project would only partially comply with plans, policies, and regulatory programs outlined in applicable City CAP measures and applicable state reduction goals and plans, policies, or regulations for the purpose of reducing GHG emissions.

The potentially significant impact on GHG emissions and climate change (ImpactGHG-3) would require the following mitigation measures to be implemented: MMGHG-1: Implement Diesel Emission-Reduction Measures During Project

Page 83 of 222 ends
Page 72 of 137 ends

Construction and Operation, MM-GHG-3: Comply with City CAP Measures, MMGHG-4: Use Modern Harbor Craft for Waterside Construction Activities, and MMGHG-5: Implement Electric Heating and Zero-Net-Energy Buildings. These measures are discussed in detail in Section 4.6, Greenhouse Gas Emissions, of Volume 2 of the EIR and are set forth in full above. These mitigation measures also are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR.

Implementation of MM-GHG-1, MM-GHG-3, MM-GHG-4, and MM-GHG-5 would reduce Impact-GHG-3 to less than significant levels because the project would be consistent with the relevant plans, policies, and regulatory programs.

4.7 Hazards and Hazardous Materials

4.7.1 Impact-HAZ-1: Residual Soil Contamination (City Program – Development Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on hazards and hazardous materials (Impact-HAZ-1) from the disturbance of potentially contaminated soils during project construction activities that could result in a release of hazardous materials and exacerbate the existing hazardous conditions. Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.7, Hazards and Hazardous Materials.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on hazards and hazardous materials (Impact-HAZ-1) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on hazards and hazardous materials (Impact-HAZ-1) is analyzed in Volume 2 (Final EIR), Section 4.7, Hazards and Hazardous Materials. Potential ImpactHAZ-1 would result from the disturbance of potentially contaminated soils during project construction activities that could result in a release of hazardous materials and exacerbate the existing hazardous conditions.

The potentially significant impact on hazards and hazardous materials (ImpactHAZ-1) will be reduced to below a level of significance by mitigation measures MMHAZ-1: Prepare and Implement a Soil and Groundwater Management Plan, MMHAZ-2: Prepare and Implement a Monitoring and Reporting Program, and MMHAZ-3: Prepare and Submit a Project Closeout Report. These mitigation measures are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provide as follows:

MM-HAZ-1: Prepare and Implement a Soil and Groundwater Management Plan (City Program – Development Component). Prior to the City’s approval of the project grading plans and the commencement of any construction activities that

Page 84 of 222 ends
Page 73 of 137 ends

would disturb the soil on the City Program – Development Component site, the project proponent shall retain a licensed Professional Geologist, Professional Engineering Geologist, or Professional Engineer with experience in contaminated site redevelopment and restoration to prepare and submit a Soil and Groundwater Management Plan to the City for review and approval. After the City’s review and approval, the project proponent shall implement the Soil and Groundwater Management Plan, which shall include the following:
• A Site Contamination Characterization Report (Characterization Report) delineating the vertical and lateral extent and concentration of residual contamination from the site’s past uses throughout the City Program – Development Component construction area. The Characterization Report shall include a compilation of data based on historical records review and from prior reports and investigations and, where data gaps are found, include new soil and groundwater sampling to characterize the existing vertical and lateral extent and concentration of residual contamination. The project proponent shall coordinate with the County of San Diego Department of Health if the Characterization Report identifies contamination.
• A Soil Testing and Profiling Plan (Testing and Profiling Plan) for those materials that shall be disposed of during construction. Testing shall occur for all potential contaminants of concern, including CA Title 22 metals, PAHs, VOCs, pesticides, PCBs, TPH, PAHs, or any other potential contaminants, as specified within the Testing and Profiling Plan. The Testing and Profiling Plan shall document compliance with CA Title 22 for proper identification and segregation of hazardous and solid waste as needed for acceptance at a CA Title 22–compliant offsite disposal facility. All excavation activities shall be actively monitored by a Registered Environmental Assessor for the potential presence of contaminated soils and for compliance with the Testing and Profiling Plan.
• A Soil Disposal Plan (Disposal Plan), which shall describe the process for excavation, stockpiling, dewatering, treating, and loading and hauling of soil from the site. This plan shall be prepared in accordance with the Testing and Profiling Plan (i.e., in accordance with CA Title 22 and DOT Title 40 CFR Part 263, California Code of Regulations Title 27), and current industry best practices for the prevention of cross contamination, spills, or releases.

Measures shall include, but not be limited to, segregation into separate piles for waste profile analysis based on organic vapor, and visual and odor monitoring.
• A Site Worker Health and Safety Plan (Safety Plan) to ensure compliance with 29 CFR Part 120, Hazardous Waste Operations and Emergency Response regulations for site workers at uncontrolled hazardous waste sites. The Safety Plan shall be based on the Characterization Report and the planned site construction activity to ensure that site workers potentially exposed to site

Page 85 of 222 ends
Page 74 of 137 ends

contamination in soil are trained, equipped, and monitored during site activity.

The training, equipment, and monitoring activities shall ensure that workers are not exposed to contaminants above personnel exposure limits established by Table Z, 29 CFR Part 1910.1000. The Safety Plan shall be signed by and implemented under the oversight of a California State Certified Industrial Hygienist.

MM-HAZ-2: Prepare and Implement a Monitoring and Reporting Program (City Program – Development Component). Prior to commencement of construction of the City Program – Development Component, the project proponent shall prepare a Monitoring and Reporting Program and submit it to the City for review and approval. The Monitoring and Reporting Program shall be implemented during and upon completion of construction of the City Program – Development Component.

The Monitoring and Reporting Program shall document implementation of the Soil and Groundwater Management Plan, including the Testing and Profiling Plan, Disposal Plan, and Safety Plan, as required by MM-HAZ-1. The Monitoring and Reporting Program shall include a requirement that the project proponent submit monthly reports (starting with the first ground disturbance activities and ending at the completion of ground disturbance activities) to the City, signed and certified by the licensed Professional Geologist, Professional Engineering Geologist, or Professional Engineer, as applicable, documenting compliance with the provisions of these plans and the overall Soil and Groundwater Management Plan.

MM-HAZ-3: Prepare and Submit a Project Closeout Report (City Program – Development Component). Within 30 days of completion of landside construction of the City Program – Development Component, the project proponent shall prepare a Project Closeout Report and submit it to the City for review and approval.

The Project Closeout Report shall summarize all environmental activity at the site and document implementation of the Soil and Groundwater Management Plan, as required by MM-HAZ-1, and the Monitoring and Reporting Program, as required by MM-HAZ-2.

Mitigation measure MM-HAZ-1 would ensure the proper handling and disposal of contaminated soil during construction activities. In addition, MM-HAZ-2 and MMHAZ-3 requires the preparation and submittal of a Monitoring and Reporting Program and a Project Closeout Report, which would ensure that the Soil Management Plan is properly implemented and documented. Implementation of MM-HAZ-1, MM-HAZ-2, and MM-HAZ-3 would reduce Impact-HAZ-1 to less-thansignificant levels by ensuring safeguards would be implemented during grounddisturbing construction activities to ensure upset and accidental conditions do not occur, and detrimental effects in the event of unanticipated upset conditions would be minimized.

Page 86 of 222 ends
Page 75 of 137 ends

4.7.2 Impact-HAZ-2: Residual Soil Contamination (Pasha Road Closures Component, Pasha Rail Improvement Component, and Bayshore Bikeway Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on hazards and hazardous materials (Impact-HAZ-2) from the disturbance of potentially contaminated soils during project construction activities associated with the Pasha Road Closures Component, Pasha Rail Improvement Component, and Bayshore Bikeway Component that could result in the release of hazardous materials and exacerbate the existing hazardous conditions. Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.7, Hazards and Hazardous Materials.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on hazards and hazardous materials (Impact-HAZ-2) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on hazards and hazardous materials (Impact-HAZ-2) is analyzed in Volume 2 (Final EIR), Section 4.7, Hazards and Hazardous Materials. Potential ImpactHAZ-2 would result from the disturbance of potentially contaminated soils during project construction activities that could result in a release of hazardous materials and exacerbate the existing hazardous conditions.

The potentially significant impact on hazards and hazardous materials (ImpactHAZ-2) will be reduced to below a level of significance by mitigation measures MMHAZ-4: Prepare and Implement a Soil and Groundwater Management Plan, MMHAZ-5: Prepare and Implement a Monitoring and Reporting Program, and MMHAZ-6: Prepare and Submit a Project Closeout Report. These mitigation measures are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provide as follows:

MM-HAZ-4: Prepare and Implement a Soil and Groundwater Management Plan (Pasha Road Closures Component, Pasha Rail Improvement Component, and Bayshore Bikeway Component). Prior to the District’s and the City’s, as applicable, approval of the project’s grading plans and the commencement of any construction activities that would disturb the soil, the project proponent shall retain a licensed Professional Geologist, Professional Engineering Geologist, or Professional Engineer with experience in contaminated site redevelopment and restoration, to prepare and submit a Soil and Groundwater Management Plan to the District‘s Environmental Protection Department and the City, as applicable, for review and approval. After the District’s and the City’s, as applicable, review and approval, the project proponent shall implement the Soil and Groundwater Management Plan, which shall include the following:
• A Site Contamination Characterization Report (Characterization Report) delineating the vertical and lateral extent and concentration of residual contamination from the site’s past uses throughout the Pasha Road Closure

Page 87 of 222 ends
Page 76 of 137 ends

Component construction area. The Characterization Report shall include a compilation of data based on historical records review and from prior reports and investigations and, where data gaps are found, include new soil and groundwater sampling to characterize the existing vertical and lateral extent and concentration of residual contamination. The project proponent shall coordinate with the County of San Diego Department of Health if the Characterization Report identifies contamination.
• A Soil Testing and Profiling Plan (Testing and Profiling Plan) for those materials that shall be disposed of during construction. Testing shall occur for all potential contaminants of concern, including CA Title 22 metals, PAHs, VOCs, pesticides, PCBs, TPH, PAHs, or any other potential contaminants, as specified within the Testing and Profiling Plan. The Testing and Profiling Plan shall document compliance with CA Title 22 for proper identification and segregation of hazardous and solid waste as needed for acceptance at a CA Title 22–compliant offsite disposal facility. All excavation activities shall be actively monitored by a Registered Environmental Assessor for the potential presence of contaminated soils and for compliance with the Testing and Profiling Plan.
• A Soil Disposal Plan (Disposal Plan), which shall describe the process for excavation, stockpiling, dewatering, treating, and loading and hauling of soil from the site. This plan shall be prepared in accordance with the Testing and Profiling Plan (i.e., in accordance with CA Title 22 and DOT Title 40 CFR Part 263, California Code of Regulations Title 27), and current industry best practices for the prevention of cross contamination, spills, or releases.

Measures shall include, but not be limited to, segregation into separate piles for waste profile analysis based on organic vapor, and visual and odor monitoring.
• A Site Worker Health and Safety Plan (Safety Plan) to ensure compliance with 29 CFR Part 120, Hazardous Waste Operations and Emergency Response regulations for site workers at uncontrolled hazardous waste sites. The Safety Plan shall be based on the Characterization Report and the planned site construction activity to ensure that site workers potentially exposed to site contamination in soil are trained, equipped, and monitored during site activity.

The training, equipment, and monitoring activities shall ensure that workers are not exposed to contaminants above personnel exposure limits established by Table Z, 29 CFR Part 1910.1000. The Safety Plan shall be signed by and implemented under the oversight of a California State Certified Industrial Hygienist.

MM-HAZ-5: Prepare and Implement a Monitoring and Reporting Program (Pasha Road Closures Component, Pasha Rail Improvement Component, and Bayshore Bikeway Component). Prior to commencement of construction of the Pasha Road Closures Component, Pasha Rail Improvement Component, and Bayshore Bikeway Component, the respective project proponent shall prepare a Monitoring and Reporting Program and submit it to the District’s Environmental Protection

Page 88 of 222 ends
Page 77 of 137 ends

Department and the City, as applicable, for review and approval. The Monitoring and Reporting Program shall be implemented during and upon completion of construction of the Pasha Road Closures Component, Pasha Rail Improvement Component, and Bayshore Bikeway Component. The Monitoring and Reporting Program shall document implementation of the Soil and Groundwater Management Plan, including the Testing and Profiling Plan, Disposal Plan, and Safety Plan, as required by MM-HAZ-4. The Monitoring and Reporting Program shall include a requirement that the project proponent submit monthly reports (starting with the first ground disturbance activities and ending at the completion of ground disturbance activities) to the District’s Development Services Department and the City, as applicable, signed and certified by the licensed Professional Geologist, Professional Engineering Geologist, or Professional Engineer, as applicable, documenting compliance with the provisions of these plans and the overall Soil and Groundwater Management Plan.

MM-HAZ-6: Prepare and Submit a Project Closeout Report (Pasha Road Closures Component, Pasha Rail Improvement Component, and Bayshore Bikeway Component). Within 30 days of completion of landside construction of the Pasha Road Closures Component, Pasha Rail Improvement Component, and Bayshore Bikeway Component, the project proponent shall prepare a Project Closeout Report and submit it to the District’s Environmental Protection Department and the City, as applicable, for review and approval. The Project Closeout Report shall summarize all environmental activity at the site and document implementation of the Soil and Groundwater Management Plan, as required by MM-HAZ-4, and the Monitoring and Reporting Program, as required by MM-HAZ-5.

Mitigation measure MM-HAZ-4 would ensure the proper handling and disposal of contaminated soil during construction activities related to the Pasha Road Closures Component, Pasha Rail Improvement Component, and Bayshore Bikeway Component. In addition, MM-HAZ-5 and MM-HAZ-6 require the preparation and submittal of a Monitoring and Reporting Program and a Project Closeout Report, which would ensure that the Soil Management Plan is properly implemented and documented. Implementation of MM-HAZ-4, MM-HAZ-5, and MM-HAZ-6 would reduce Impact-HAZ-2 to less-than-significant levels by ensuring safeguards would be implemented during ground-disturbing construction activities to ensure upset and accidental conditions do not occur, and detrimental effects in the event of unanticipated upset conditions would be minimized.

4.7.3 Impact-HAZ-3: Conflict with Conditions of Regulatory Closure (City Program – Development Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on hazards and hazardous materials (Impact-HAZ-3) resulting from a conflict with the requirements of the Department of Environmental Health (DEH) closure and the proposed development of the City Program – Development Component, which would include hotel uses. Detailed information and analysis regarding this

Page 89 of 222 ends
Page 78 of 137 ends

potentially significant impact are provided in Volume 2 (Final EIR), Section 4.7, Hazards and Hazardous Materials.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on hazards and hazardous materials (Impact-HAZ-3) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on hazards and hazardous materials (Impact-HAZ-3) is analyzed in Volume 2 (Final EIR), Section 4.7, Hazards and Hazardous Materials. Potential ImpactHAZ-3 would result from the development of City Program – Development Component for hotel use, which would conflict with the requirements of the DEH closure and could exacerbate existing hazardous conditions.

The potentially significant impact on hazards and hazardous materials (ImpactHAZ-3) will be reduced to below a level of significance by mitigation measure MMHAZ-7: Coordinate with the DEH. This mitigation measure is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provides as follows:

MM-HAZ-7: Coordinate with the DEH (City Program – Development Component).

Prior to ground disturbing activities on the City Program – Development Component site, the project proponent for the City Program – Development Component shall coordinate with the DEH to reopen VAP Cases #H23772-005, #H36620-001, and #H23772-004 to determine if the existing conditions would be below acceptable cleanup thresholds for hotel use. If the DEH determines the onsite conditions do not meet thresholds for future hotel uses, the project proponent must comply with the requirements of the DEH to achieve remediation standards.

Implementation of MMHAZ-7 would reduce Impact-HAZ-3 to less-than-significant levels because coordination with the DEH would ensure the cases would be reviewed, and remediated if necessary, to the appropriate remediation standard for future hotel use.

4.7.4 Impact-HAZ-4: Inadequate Emergency Access from Temporary Road Closures During Construction (Balanced Plan, GB Capital Component, Pasha Rail Improvement Component, Pasha Road Closures Component, Bayshore Bikeway Component, City Program – Development Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on hazards and hazardous materials (Impact-HAZ-4) from construction activities causing potential road blockages that could prevent emergency response vehicles from accessing parts of the project site or vicinity and physically interfere with the implementation of an emergency access or response plan. Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.7, Hazards and Hazardous Materials.

Page 90 of 222 ends
Page 79 of 137 ends

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on hazards and hazardous materials (Impact-HAZ-4) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on hazards and hazardous materials (Impact-HAZ-4) is analyzed in Volume 2 (Final EIR), Section 4.7, Hazards and Hazardous Materials. Potential ImpactHAZ-4 would result from construction activities causing potential road blockages that could prevent emergency response vehicles from accessing parts of the project site or vicinity and physically interfere with the implementation of an emergency access or response plan.

The potentially significant impact on hazards and hazardous materials (ImpactHAZ-4) will be reduced to below a level of significance by mitigation measures MMTRA-3: Implement Traffic Control Measures During Construction, and MM-HAZ-8:

Maintain Emergency Access Road During Construction. These mitigation measures are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provide as follows:

MM-TRA-3: Implement Traffic Control Measures During Construction (Balanced Plan, GB Capital Component, Pasha Rail Improvement Component, Pasha Road Closures Component, Bayshore Bikeway Component, City Program – Development Component). See Section 4.12, Transportation, Circulation, and Parking.

MM-HAZ-8: Maintain Emergency Access Road During Construction (Pasha Road Closures Component). A temporary emergency access road shall be maintained by the project proponent at all times during construction of the Pasha Road Closures Component. The location and components, as defined per the California Fire Code, of the temporary emergency access road shall be submitted to the City Fire Marshal for review and approval prior to closure of the roadway(s) to throughtraffic. Written verification of inclusion of the temporary emergency vehicle access shall be provided to the District’s Director of Planning prior to closure of the roadway(s) to through-traffic. Said written verification can be provided via a copy of the plans that have been stamped/approved by the City Fire Marshal, or the Fire Marshal’s designee, or verification can be provided with a copy of the Fire Permit.

MM-TRA-3 would require the implementation of a Traffic Control Plan, which would maintain emergency access to the proposed project and nearby properties. MMHAZ-8 would require the project proponent to submit the location and components of the temporary emergency access road to the City Fire Marshal. Implementation of MM-TRA-3 and MM-HAZ-8 would reduce Impact-HAZ-4 to less-than-significant levels by ensuring emergency vehicle access would be maintained to the proposed project site and nearby properties during construction.

Page 91 of 222 ends
Page 80 of 137 ends

4.7.5 Impact-HAZ-5: Inadequate Emergency Access from the Closure of Tidelands Avenue During Operation (Pasha Road Closures
Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on hazards (Impact-HAZ-5) due to inadequate emergency access during operation from the closure of portions of Tidelands Avenue. Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.7, Hazards and Hazardous Materials.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on hazards (Impact-HAZ5) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on hazards (Impact-HAZ-5) is analyzed in Volume 2 (Final EIR), Section

4.7, Hazards and Hazardous Materials. Potential Impact-HAZ-5 would result from the closure of portions of Tidelands Avenue causing inadequate emergency access during operation.

The potentially significant impact on hazards and hazardous materials (ImpactHAZ-5) will be reduced to below a level of significance by mitigation measure MMHAZ-9: Coordinate with the City Fire Marshal. This mitigation measure is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provides as follows:

MM-HAZ-9: Coordinate with the City Fire Marshal (Pasha Road Closures Component). Prior to closure of the Pasha Road Closures Component to throughtraffic, the project proponent for said project component shall prepare and submit plans to the City Fire Marshal for review and approval that demonstrate compliance with applicable state and local fire code regulations related to secondary access, emergency access, and maximum dead‐end road length. At a minimum, the plans shall demonstrate that the project will include the following items related to emergency vehicle access:
• An emergency access road, on the existing alignment of Tidelands Avenue between Bay Marina Drive and the 32nd Street, that has an unobstructed minimum width of 20 feet (or 26 feet when a fire hydrant is located on the emergency access road), exclusive of shoulders or rolled curbs. The emergency access road shall be paved using an all‐weather surface and shall support the imposed loads (75,000 pounds) of a fire apparatus. The emergency access road shall include official approved signs or other approved notices or markings that include the words “NO PARKING – FIRE LANE.” At all times, the emergency access road shall not be obstructed in any manner, including the parking of vehicles.
• Any entrance/exit gates to/from the Pasha Road Closures Component shall be equipped with Knox Key Switches and Emergency Strobes to provide

Page 92 of 222 ends
Page 81 of 137 ends

emergency vehicle access, including ingress and egress. A lock box (Knox Key Switch for fire and police) shall be required in conjunction with a detector/strobe switch to allow emergency vehicles to flash a vehicle-mounted strobe light towards the detector/strobe switch, which in turn overrides the system and opens the gate. The lock box and detector/strobe switch shall be placed at the front of each gate (the side of the gate that is adjacent to a public street). Any electric gate opener shall be listed in accordance with UL 325. Gates utilizing emergency strobe operation shall be designed, constructed, and installed to comply with requirements of ASTM F2200, and shall be maintained operational at all times, including but not limited to, in the event of an electrical outage. Any entrance/exist gates to/from the Pasha Road Closures Component shall maintain an unobstructed vertical clearance of a minimum of 13 feet, 6 inches. • Fire hydrants shall be located throughout the Pasha Road Closures Component site and shall be spaced no less than 400 feet apart. Fire hydrants shall be located within 400 feet of all locations that are roadway accessible (measurement starts from the nearest existing fire hydrant to the Pasha Road Closures Component site). Where a fire hydrant is located on an emergency access road, the minimum road width shall be 26 feet. All turns available for fire access and travel shall maintain a minimum radius of 28 feet.

Prior to utilization of the Pasha Road Closures Component for marine-related operations, the above-described emergency vehicle access shall be field-verified by the City Fire Marshal, or the Fire Marshal’s designee. Written verification of inclusion of the above-described emergency vehicle access shall be provided to the District’s Director of Planning prior to Pasha’s utilization of the Pasha Road Closures Component for marine-related operations. Said written verification can be provided via a copy of the plans that have been stamped/approved by the City Fire Marshal, or the Fire Marshal’s designee, or verification can be provided with a copy of the Fire Permit.

MM-HAZ-9 would require coordination with the City Fire Marshal that would ensure that necessary features would be included as part of the Pasha Road Closures Component, such as an emergency access road, entrance/exit gates, and fire hydrants. Implementation of MM-HAZ-9 would reduce Impact-HAZ-5 to less-thansignificant levels by ensuring emergency vehicle access would be maintained to the proposed project site and nearby properties during operation.

4.7.6 Impact-HAZ-7: Inadequate Emergency Access from Marina Way Realignment (Balanced Plan or GB Capital Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on hazards (Impact-HAZ-7) associated with inadequate emergency access during operation from the implementation of traffic calming devices along Marina Way.

Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.7, Hazards and Hazardous Materials.

Page 93 of 222 ends
Page 82 of 137 ends

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on hazards (Impact-HAZ7) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on hazards (Impact-HAZ-7) is analyzed in Volume 2 (Final EIR), Section

4.7, Hazards and Hazardous Materials. The realignment of Marina Way (Balanced Plan or GB Capital Component, if that alignment of Marina Way is selected) has the potential to result in inadequate emergency access during operation through the installation of traffic-calming devices (Impact-HAZ-7).

The potentially significant impact on hazards (Impact-HAZ-7) will be reduced to below a level of significance by mitigation measure MM-HAZ-11: Manage Marina Way Realignment Conditions. This mitigation measure is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provides as follows:

MM-HAZ-11: Manage Marina Way Realignment Conditions (Balanced Plan or GB Capital Component). The Marina Way Realignment proposed as part of the Balanced Plan (or GB Capital Component) shall not include traffic calming devices (e.g., speed humps), unless prior-written approval is obtained from the City Fire Marshal.

MM-HAZ-11 would ensure that any traffic-calming devices incorporated as part of the Marina Way alignment (whether it is the alignment in the Balanced Plan or the alignment in the GB Capital Component) would be approved by the City Fire Marshal. Implementation of MM-HAZ-11 would reduce Impact-HAZ-7 to less-thansignificant levels by ensuring unapproved traffic calming devices would not be installed and emergency vehicle access would be maintained to the proposed project site and nearby properties.

4.8 Land Use and Planning

4.8.1 Impact-LU-2: Temporary Inundation for 2030 and 2050 (Balanced Plan, GB Capital Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on land use and planning (Impact-LU-2) associated with temporary inundation that is projected to impact the Pepper Park expansion of the Balanced Plan and the jetty area of the GB Capital Component. Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.9, Land Use and Planning.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on land use and planning (Impact-LU-2) as identified in the EIR.

Page 94 of 222 ends
Page 83 of 137 ends

Facts in Support of Finding: The potentially significant impact of the proposed project on land use and planning (Impact-LU-2) is analyzed in Volume 2 (Final EIR), Section 4.9, Land Use and Planning. Potential Impact-LU-2 would result from temporary inundation that is anticipated to impact greater portions of Pepper Park and park expansion site as well as the jetty area of the GB Capital Component.

The potentially significant impact on land use and planning (Impact-LU-2) would be reduced to below a level of significance by mitigation measures MM-LU-2:

Design the Pepper Park Expansion to Account for Sea Level-Rise through 2050 and MM-LU-3: Conduct Engineering-Level, Site-Specific Assessment of Sea Level-Rise through 2050. These mitigation measures are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provide as follows:

MM-LU-2: Design the Pepper Park Expansion to Account for Sea-Level Rise through 2050 (Balanced Plan). The project proponent for the Pepper Park expansion shall design the park to accommodate water during future flooding events. Methods to accommodate water during future flooding events include, but are not limited to:
• Elevating the waterside promenades;
• Regrading coastal edges and/or inland portions of the park as appropriate; • Creating living shorelines;
• Ensuring that any new vegetation is salt tolerant;
• Developing an operational plan to close the parking lot and move parked vehicles prior to storm events;
• Including pervious surfaces such as turf, sand, and pervious concrete.

Moreover, public access to Pepper Park shall be restricted during flood events.

If any structures are constructed in Pepper Park, prior to construction, the project proponent shall conduct an engineering-level, site-specific assessment of the projected SLR at the site through 2050.

Additionally, the project proponent shall create an early warning system to monitor the risk of potential flooding of any structure. An early warning system should consist of protocols for obtaining information on local weather alerts and established levels at which additional action (e.g., sandbagging) will be taken.

Also, the project proponent shall establish emergency evacuation procedures for people to relocate to higher ground on short notice. Before a large storm, deployment of sandbags or inflatable barriers shall occur if deemed necessary.

MM-LU-3: Conduct Engineering-Level, Site-Specific Assessment of Sea-Level Rise through 2050 (GB Capital Component). The project proponent for the GB Capital Component shall conduct an engineering-level, site-specific assessment of the projected SLR at the site through 2050. If the assessment projects the jetty to be temporarily inundated by 2050, the development on the jetty shall include the following:

Page 95 of 222 ends
Page 84 of 137 ends

Smart Design Decisions – to be incorporated into building design and part of construction:
• Place any mechanical and electrical equipment at least 2 feet above the design flood elevation to reduce risk of flood damage. If equipment must be placed in lower areas, elevate base or ensure assets are composed of flood damage– resistant materials.
• Design water supply, sanitary sewage, and stormwater systems to minimize or eliminate infiltration of flood waters into systems and vice versa. • Ensure that all building exterior walls are composed of materials that have an impermeable and waterproof membrane.

Future Adaptation Strategies – to be incorporated into building design and part of construction:
• Ensure that building foundations, if any, are capable of supporting future flood walls or temporary flood barriers.
• Design building openings (e.g., doors, windows, utility penetrations) to be capable of future retrofitting to make them watertight and resistant to flood loads.
• Design key structural elements of the jetty to allow future increases in the elevation of the jetty.

Operational Strategies – to be implemented during operation:
• Establish an early warning system to monitor the risk of potential flooding. An early warning system should consist of:
o Protocols for obtaining information on local weather alerts and established levels at which additional action (e.g., sandbagging) will be taken;
o Protocols for monitoring water levels at nearby storm gauges prior to the storm arrival, and regular checking of the water levels along the jetty as the storm progresses;
• Establish emergency evacuation procedures for people to relocate to higher ground on short notice;
• Obtain backup power generators for occupiable development on the jetty and portable pumps and ensure there is sufficient fuel to operate these. Establish protocols for operating said generators and pumps during storm events or other such events;
• Before a large storm, deploy sandbags or inflatable barriers; • Before a storm, test emergency power sources and pumps and ensure there is sufficient fuel to run these, and inspect building exteriors to ensure there are no penetrations that lack flood proofing;
• Restrict public access during storms or flooding events.

Prior to issuance of the first building permit for any development on the jetty, the assessment and project plans (revised pursuant to the findings of the assessment, if the assessment projects inundation by 2050) shall be submitted to the District’s

Page 96 of 222 ends
Page 85 of 137 ends

Development Services Department and the City’s building permit department for review and approval.

Implementation of mitigation measures MM-LU-2 and MM-LU-3 would reduce Impact-LU-2 to a less-than-significant level because those project components would be designed and constructed to accommodate projected inundation.

However, because permanent inundation at Pepper Park is not expected until closer to 2100, coastal protections that effectively mitigate permanent inundation could be implemented later in the century, rather than in the near future.

4.8.2 Impact-LU-3: Temporary and/or Permanent Inundation for 2100 (Balanced Plan, GB Capital Component, Pasha Road Closures Component, Bayshore Bikeway Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on land use and planning (Impact-LU-3) associated with temporary and permanent inundation that is projected to occur in 2100 at the Pepper Park expansion and the first point of rest parcel of the Balanced Plan, the jetty area of the GB Capital Component, the Pasha Road Closures Component, and the Bayshore Bikeway Component. Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.9, Land Use and Planning.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on land use and planning (Impact-LU-3) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on land use and planning (Impact-LU-3) is analyzed in Volume 2 (Final EIR), Section 4.9, Land Use and Planning. Potential Impact-LU-3 would result from temporary and permanent inundation that is anticipated to impact Pepper Park expansion and the first point of rest parcel of the Balanced Plan, the jetty area of the GB Capital Component, the Pasha Road Closures Component, and the Bayshore Bikeway Component in 2100.

The potentially significant impact on land use and planning (Impact-LU-3) would be reduced to below a level of significance by mitigation measures MM-LU-4: Use Updated Modeling and Monitoring for Adaptive Management for 2100 Scenario (Balanced Plan, GB Capital Component, Pasha Road Closures Component, portion of Bayshore Bikeway Component) and MM-LU-5: Use Updated Modeling and Monitoring for Adaptive Management for 2100 Scenario (most of Bayshore Bikeway Component). These mitigation measures are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provide as follows:

MM-LU-4: Use Updated Modeling and Monitoring for Adaptive Management for 2100 Scenario (Balanced Plan, GB Capital Component, Pasha Road Closures Component, portion of Bayshore Bikeway Component). For areas of the Balanced Plan (Pepper Park and the FPR), the GB Capital Component, the Pasha Road Closures Component, and the portions of the Bayshore Bikeway Component

Page 97 of 222 ends
Page 86 of 137 ends

(within the District’s jurisdiction) that are projected to be inundated in 2100, the District shall conduct ongoing monitoring of these project component sites every 5 to 10 years. If, through monitoring, the observed SLR conditions appear to be consistent with the 2100 projections identified in this EIR, a site-specific assessment shall be conducted to identify future SLR projections using the best science available at the time and identify appropriate adaptation strategies to ensure that these areas are resilient to coastal flooding and inundation from SLR.

Such strategies may include a neighborhood-level effort, raising of grades, additional shoreline protection, removal or movement of assets, and conversion of impervious surfaces to pervious surfaces.

MM-LU-5: Use Updated Modeling and Monitoring for Adaptive Management for 2100 Scenario (most of Bayshore Bikeway Component). For the areas of the Bayshore Bikeway Component that are within the City’s jurisdiction, the City shall conduct ongoing monitoring of these areas every 5 to 10 years. If, through monitoring, the observed SLR conditions appear to be consistent with the 2100 projections identified in this EIR, a site-specific assessment shall be conducted to identify future SLR projections using the best science available at the time and identify appropriate adaptation strategies to ensure that these areas are resilient to coastal flooding and inundation from SLR. Such strategies may include a neighborhood-level effort, raising of grades, additional shoreline protection, or removal or movement of assets.

Implementation of mitigation measures MM-LU-4 and MM-LU-5 would reduce Impact-LU-3 to a less-than-significant level because ongoing monitoring of these project component sites would be conducted to observe SLR conditions and, if necessary, site-specific assessments would be prepared to identify appropriate adaptation strategies to ensure that areas projected to be inundated are resilient.

4.9 Noise and Vibration

4.9.1 Impact-NOI-1: Exceedance of the City’s Noise Ordinance During Project Construction (Balanced Plan, Bayshore Bikeway Component, City Program – Development Component, GB Capital Component, Pasha Road Closures Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on noise and vibration (Impact-NOI-1) associated with construction-related noise that would exceed the threshold of 70 dBA Lmax at noise-sensitive receptors.

Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.10, Noise and Vibration.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on noise and vibration (Impact-NOI-1) as identified in the EIR. However, such changes or alterations may not reduce all construction noise levels to a level below significance and a

Page 98 of 222 ends
Page 87 of 137 ends

Statement of Overriding Considerations pursuant to State CEQA Guidelines §15093 is required.

Facts in Support of Finding: The potentially significant impact of the proposed project on noise and vibration (Impact-NOI-1) is analyzed in Volume 2 (Final EIR), Section 4.10, Noise and Vibration. Potential Impact-NOI-1 would result from project construction noise exceeding 70 dBA Lmax between 7:00 a.m. and 7:00 p.m. at noise-sensitive receptors. These impacts would occur during construction of the Bayshore Bikeway at residential receptors within 520 feet of the selected bikeway alignment; at residential receptors north of the site (on Cleveland Avenue) and the National City Adult School to the east (across I-5) during pile driving at the City Program – Development Component; and at the proposed Balanced Plan Pepper Park due to construction at the GB Capital Component and the Pasha Road Closures Component.

The potentially significant impact on noise and vibration (Impact-NOI-1) would be reduced by mitigation measures MM-NOI-1: Prohibit Exterior Construction Activities Outside of the Permitted Construction Hours (Balanced Plan, Bayshore Bikeway Component, City Program – Development Component, GB Capital Component, Pasha Road Closures Component), MM-NOI-2: Avoid or Reduce Construction Noise from Pile Driving (City Program – Development Component, GB Capital Component), and MM-NOI-3: Avoid or Reduce Construction Noise from Other (Non-Pile-Driving) Construction Activities (Bayshore Bikeway Component, GB Capital Component, Pasha Road Closures Component). These mitigation measures are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provide as follows:

MM-NOI-1: Prohibit Exterior Construction Activities Outside of the Permitted Construction Hours (Balanced Plan, Bayshore Bikeway Component, City Program – Development Component, GB Capital Component, Pasha Road Closures Component). For the Balanced Plan, Bayshore Bikeway Component, City Program – Development Component, GB Capital Component, and Pasha Road Closures Component, the project proponent for that respective project component shall require their contractor(s) not to conduct exterior construction activities outside the hours of 7:00 a.m. to 7:00 p.m. Monday through Friday. Material or equipment deliveries and collections shall also be prohibited outside of these hours. Except for construction personnel specifically working on interior construction tasks within a completed building shell, construction personnel shall not be permitted on the job site outside of the permitted hours.

MM-NOI-2: Avoid or Reduce Construction Noise from Pile Driving (City Program – Development Component, GB Capital Component). During all pile driving at the City Program – Development Component and GB Capital Component, the project proponent shall require its construction contractor to implement one of the following methods to reduce maximum pile-driving noise levels at the affected noise-sensitive receptors (residences on Cleveland Avenue, the National City

Page 99 of 222 ends
Page 88 of 137 ends

Adult School, and Pepper Park) to 70 dBA Lmax or less:

• Avoid impact pile driving by using quieter alternative installation methods, such as press-in piles or drilled piles (e.g., cast-in-drilled-hole, poured-in-place piles).
• Use an acoustical shroud around impact pile driving. The shroud shall be constructed of materials that provide a minimum sound transmission class (STC) of 28 (examples include sound-rated acoustical blankets).

MM-NOI-3: Avoid or Reduce Construction Noise from Other (Non-Pile-Driving) Construction Activities (Bayshore Bikeway Component, GB Capital Component, Pasha Road Closures Component). During all non-pile-driving construction activity at the Bayshore Bikeway Component, GB Capital Component, and the Pasha Road Closures Component, the project proponent shall require their construction contractor(s) to implement one of the following methods to reduce maximum noise levels at the affected noise-sensitive receptors (residences on Cleveland Avenue and McKinley Avenue, and Pepper Park) to 70 dBA Lmax or less:
• Avoid operating high impact demolition equipment (hydraulic breakers, jackhammers, concrete saws) within 520 feet of any noise-sensitive receptors and avoid operating all other mechanized construction equipment within 280 feet of the affected noise-sensitive receptors.
• Where the above-specified distances cannot be maintained, install temporary noise barrier(s) between construction activities and the noise-sensitive receptor(s). Barriers may be constructed around the site perimeter or, when construction activities are restricted to a smaller portion of the site, around that smaller portion of the site, or around any noisy stationary construction equipment such as generators or dewatering pumps. All such barriers must be at least 8 feet high and of sufficient height to break the line-of-sight between the construction equipment and the ground floor of any noise-sensitive receptor. These barriers shall be constructed in one of the following ways that the project proponent establishes, in writing and to the satisfaction of the District, shall achieve a minimum sound transmission class (STC) rating of 28:

o From acoustical blankets hung over or from a supporting frame. The blankets should be firmly secured to the framework. The blankets should be overlapped by at least 4 inches at seams and taped and/or closed with hook-and-loop fasteners (i.e., Velcro®) so that no gaps exist. The blankets shall be draped to the ground to eliminate any gaps at the base of the barrier.
o From commercially available acoustical panels lined with soundabsorbing material (the sound-absorptive faces of the panels should face the construction equipment).

Page 100 of 222 ends
Page 89 of 137 ends

o From common construction materials such as plywood.

Implementation of mitigation measures MM-NOI-1, MM-NOI-2, and MM-NOI-3 would reduce Impact-NOI-1. However, it may not be possible to fully reduce all construction noise levels to comply with the noise limits specified in the City’s Noise Ordinance (Municipal Code Section 12.10.160). Limitations may include the inability to use alternative pile-driving methods or acoustical shrouds due to engineering, constructability, or safety considerations; the need to operate construction equipment in proximity to noise-sensitive receptors; or the inability to construct efficient temporary noise barriers due to local terrain conditions, or engineering, constructability, or safety considerations. As a result, construction noise impacts would remain significant and unavoidable and a Statement of Overriding Considerations pursuant to State CEQA Guidelines §15093 is required.

4.9.2 Impact-NOI-2: Exceedance of the City’s General Plan Noise Exposure Standards Due to Traffic Noise at Onsite Visitor Accommodations (City Program – Development Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on noise and vibration (Impact-NOI-2) associated with traffic noise that could exceed 65 dB CNEL at the proposed City Program – Development Component proposed hotel site due to traffic on Cleveland Avenue and Bay Marina Drive.

Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.10, Noise and Vibration.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on noise and vibration (Impact-NOI-2) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on noise and vibration (Impact-NOI-2) is analyzed in Volume 2 (Final EIR), Section 4.10, Noise and Vibration. Potential Impact-NOI-2 would result from traffic noise that could exceed 65 dB CNEL at the proposed City Program – Development Component proposed hotel site due to traffic on Cleveland Avenue and Bay Marina Drive.

The potentially significant impact on noise and vibration (Impact-NOI-2) would be reduced by mitigation measure MM-NOI-4: Design and Construct the Proposed Hotel at the City Program – Development Component Site to Achieve an Interior Noise Level of 45 dB CNEL or Less at Noise-Sensitive Occupied Spaces. This mitigation measure is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provides as follows:

MM-NOI-4: Design and Construct the Proposed Hotel at the City Program – Development Component Site to Achieve an Interior Noise Level of 45 dB CNEL or Less at Noise-Sensitive Occupied Spaces (City Program – Development Component). During the architectural and engineering design, prior to the issuance

Page 101 of 222 ends
Page 90 of 137 ends

of any building permits for the hotel, the project proponent for the City Program – Development Component shall retain an acoustical consultant to ensure that the building design provides adequate noise insulation to achieve the City’s interior noise standard of 45 dB CNEL, as specified in the National City General Plan Noise Element, at occupied spaces. If necessary, the consultant shall recommend design features such as, but not limited to, fresh-air supply systems (to allow windows to remain closed), sound-rated windows, or other façade upgrades. The project proponent shall submit a copy of the acoustical consultant’s report, along with evidence that all recommended design features have been incorporated into the project design, to the City’s Community Development Department for review and approval prior to hotel construction.

Implementation of mitigation measure MM-NOI-4 would reduce Impact-NOI-2 to less-than-significant levels because it would ensure that development at the City Program – Development Component site would be designed and constructed to control exterior-to-interior noise that could affect sensitive occupied spaces. As a result, interior noise levels would comply with the interior noise standards specified in the National City General Plan Noise Element (i.e., 45 dB CNEL at sensitive interior spaces).

4.9.3 Impact-NOI-3: Exceedance of the City’s General Plan Noise Exposure Standards Due to Rail Noise at Proposed Onsite Visitor
Accommodations (GB Capital Component, Pasha Rail Improvement Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on noise and vibration (Impact-NOI-3) associated with rail noise exposure that could exceed 65 dB CNEL at the proposed hotels and RV resort at the GB Capital Component site due to operations of the proposed Pasha Rail Improvement Component and existing National City Marine Terminal rail operations. Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.10, Noise and Vibration.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on noise and vibration (Impact-NOI-3) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on noise and vibration (Impact-NOI-3) is analyzed in Volume 2 (Final EIR), Section 4.10, Noise and Vibration. Potential Impact-NOI-3 would result from rail noise exposure that could exceed 65 dB CNEL at the proposed hotels and RV resort at the GB Capital Component site due to operations of the proposed Pasha Rail Improvement Component and existing National City Marine Terminal rail operations.

The potentially significant impact on noise and vibration (Impact-NOI-3) would be reduced by mitigation measures MM-NOI-5: Reduce Rail Noise Levels at the

Page 102 of 222 ends
Page 91 of 137 ends

Proposed GB Capital RV Sites to 65 dB CNEL or Less and MM-NOI-6: Design and Construct the Hotels at the GB Capital Component to Achieve an Interior Noise Level of 45 dB CNEL or Less at Noise-Sensitive Occupied Spaces. These mitigation measures are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provide as follows:

MM-NOI-5: Reduce Rail Noise Levels at the Proposed GB Capital RV Sites to 65 dB CNEL or Less (Pasha Rail Component, GB Capital Component). The project proponent for the GB Capital Component shall design its dry boat storage so that it is enclosed and made from solid material (versus fabric, chain link fencing or similar pervious/open materials) and shall submit a noise study conducted by an acoustical consultant that analyzes the noise from the Pasha Rail Improvement Component with the enclosed dry boat storage as a buffer, demonstrating the noise levels at the proposed RV park location. The noise study shall be submitted to the District’s Development Services Department for its review 3 months after issuance of a Coastal Development Permit (CDP) for any phase of the GB Capital Component and prior to the construction of the RV park. The project proponent shall construct the dry boat storage as designed. If the noise study shows that the rail noise exposure at the proposed RV sites is at or below 65 dB CNEL, then no additional steps as specified in this mitigation measure shall be required.

If the noise study shows that noise levels are above 65 dB CNEL at the proposed RV sites, then prior to occupancy of the GB Capital RV Resort or operation of the Pasha Rail Improvement Component, whichever occurs last, a sound barrier shall be constructed to reduce the rail noise exposure at the proposed RV sites to 65 dB CNEL or less. The noise barrier shall be the equal (50/50) shared financial responsibility of the project proponents for the Pasha Rail Improvement Component and the GB Capital Component. In the event that both components are not constructed at the same time, the project proponent (Payee) of the component last constructed shall construct and pay for the entire specified noise control and the other project proponent (Reimbursee) shall reimburse the Payee 50% of the actual cost of designing, permitting, and constructing the noise control unless another payment arrangement is agreed upon between the project proponents and approved by the District. Such reimbursement shall be a condition of the CDPs for the Pasha Rail Improvement Component and the RV resort associated with the GB Capital Component. The noise barrier shall be constructed between the south side of the Pasha Rail Improvement Component and the GB Capital RV Resort. The barrier shall fully block the line-of-sight between the RV sites and a standard freight locomotive on the Pasha Rail Improvement Component site, and is anticipated to be a minimum barrier height of 16 feet relative to the finished track elevation. The barrier shall be a continuous structure without gaps or openings and shall extend from the north end of the Pasha Rail Improvement Component to Tidelands Avenue. The barrier shall be constructed of a solid material and, if necessary to meet the noise requirement, the density of 4 pounds per square foot (e.g., concrete block or concrete panels).

MM-NOI-6: Design and Construct the Hotels at the GB Capital Component to

Page 103 of 222 ends
Page 92 of 137 ends

Achieve an Interior Noise Level of 45 dB CNEL or Less at Noise-Sensitive Occupied Spaces (GB Capital Component). During the architectural and engineering design, prior to the issuance of any building permits for the hotels, the project proponent for the GB Capital Component shall retain an acoustical consultant to ensure that the project design provides adequate noise insulation to achieve the City’s interior noise standard of 45 dB CNEL, as specified in the National City General Plan Noise Element, at occupied spaces. If necessary, the consultant shall recommend design features such as, but not limited to, fresh-air supply systems (to allow windows to remain closed), sound-rated windows, or other façade upgrades. The project proponent shall submit a copy of the acoustical consultant’s report, along with evidence that all recommended design features have been incorporated into the project design, to the District’s Development Services Department for review and approval prior to construction of any hotel.

Implementation of mitigation measures MM-NOI-5 and MM-NOI-6 would reduce Impact-NOI-3 to less-than-significant levels. Mitigation measure MM-NOI-5 would require a noise barrier or the dry boat storage (proposed by GB Capital) to be enclosed and made from solid material to reduce the rail noise exposure at the proposed GB Capital Component RV sites to 65 dB CNEL or less for compliance with the City’s exterior noise compatibility guidelines, as specified in the National City General Plan Noise Element. Mitigation measure MM-NOI-6 would ensure GB Capital Component hotels would be designed and constructed so as to control exterior-to-interior noise that could affect sensitive occupied spaces. As a result, interior noise levels would be in compliance with the interior noise standards specified in the National City General Plan Noise Element (i.e., 45 dB CNEL at sensitive interior spaces).

4.9.4 Impact-NOI-4: Potential Exceedance of the City’s Municipal Code Noise Standards at Existing Offsite Sensitive Receptors Due to Onsite Operations (City Program – Development Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on noise and vibration (Impact-NOI-4) associated with mechanical equipment noise levels from the City Program – Development Component proposed hotel, which could exceed the municipal code limits at nearby homes to the north and at the Best Western Hotel to the south. Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section

4.10, Noise and Vibration.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on noise and vibration (Impact-NOI-4) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on noise and vibration (Impact-NOI-4) is analyzed in Volume 2 (Final EIR), Section 4.10, Noise and Vibration. Potential Impact-NOI-4 would result from mechanical equipment noise levels from the City Program – Development

Page 104 of 222 ends
Page 93 of 137 ends

Component proposed hotel potentially exceeding the nighttime limits of 45 dBA Leq at nearby homes to the north and 60 dBA Leq at the Best Western Hotel to the south. Mechanical equipment noise would also cause a nighttime ambient noise increase of 5 dB at the Best Western Hotel.

The potentially significant impact on noise and vibration (Impact-NOI-4) would be reduced by mitigation measure MM-NOI-7: Design and Install All Onsite Mechanical Equipment at the City Program – Development Component Site to Comply with the City’s Noise Ordinance. This mitigation measure is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provides as follows:

MM-NOI-7: Design and Install All Onsite Mechanical Equipment at the City Program – Development Component Site to Comply with the City’s Noise Ordinance (City Program – Development Component). During the architectural and engineering design phase, prior to the issuance of any building permits for the City Program – Development Component, the project proponent for the City Program – Development Component shall retain an acoustical consultant to evaluate the design and provide recommendations, as necessary, to ensure that all aspects of this project component, including mechanical equipment and other onsite stationary sources (e.g., trash compactors, loading docks), are designed and will be installed to comply with the City’s Noise Ordinance (Municipal Code Chapter 12.06). Such recommendations may include, but are not limited to, changes in equipment locations; sound power limits or specifications; rooftop parapet walls; acoustic absorption materials, louvers, screens, or enclosures; or intake and exhaust silencers. The project proponent shall submit a copy of the acoustical consultant’s report, along with evidence that all recommended design features have been incorporated into the project design, to the City’s Community Development Department for review and approval prior to hotel construction.

Implementation of mitigation measure MM-NOI-7 would reduce Impact-NOI-4 to less-than-significant levels by ensuring that development at the City Program – Development Component site would be designed and constructed so that noise from onsite mechanical equipment and other onsite stationary sources would comply with the City’s Noise Ordinance.

4.9.5 Impact-NOI-5: Potential Exceedance of the City’s Municipal Code Noise Standards at Onsite Sensitive Receptors Due to Onsite Operations (GB Capital Component, Balanced Plan)
Potentially Significant Impact: The EIR identifies a potentially significant impact on noise and vibration (Impact-NOI-5) associated with noise levels from the dry boat storage facility which could exceed municipal code noise limits at the Phase 1 and Phase 2 RV resort at the GB Capital Component. Additionally, noise levels from events at the potential Balanced Plan Pepper Park amphitheater could exceed nighttime noise limits at GB Capital Component RV Resort Phase 1, Hotel #1, Hotel #2, and modular cabins. Detailed information and analysis regarding this

Page 105 of 222 ends
Page 94 of 137 ends

potentially significant impact are provided in Volume 2 (Final EIR), Section 4.10, Noise and Vibration.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on noise and vibration (Impact-NOI-5) as identified in the EIR. Although such changes or alterations would reduce noise impacts associated with the potential Balanced Plan Pepper Park Amphitheater to below a level of significance, impacts from noise from the dry boat storage facility would remain significant even after implementation of the required changes or alterations and a Statement of Overriding Considerations pursuant to State CEQA Guidelines §15093 is required.

Facts in Support of Finding: The potentially significant impact of the proposed project on noise and vibration (Impact-NOI-5) is analyzed in Volume 2 (Final EIR), Section 4.10, Noise and Vibration. Potential Impact-NOI-5 would result from noise levels from the dry boat storage facility, which could exceed both the daytime and nighttime limits of 60 and 65 dBA Leq, respectively, at the Phase 1 and Phase 2 RV resort at the GB Capital Component. Noise levels from events at the proposed Balanced Plan Pepper Park amphitheater could exceed nighttime limits of 60 dBA Leq at GB Capital Component RV Resort Phase 1, Hotel #1, Hotel #2, and modular cabins. Noise from the amphitheater could also exceed the daytime limits of 65 dBA Leq at the GB Capital Component RV Resort Phase 1, Hotel #1, and modular cabins.

The potentially significant impact on noise and vibration (Impact-NOI-5) would be reduced by mitigation measures MM-NOI-8: Design and Operate the Proposed Dry Boat Storage Facility to Comply with the City’s Noise Ordinance at the Adjacent Proposed RV Resort and MM-NOI-9: Regulate Organized Events at Pepper Park, Including Use of the Proposed Amphitheater. These mitigation measures are set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provide as follows:

MM-NOI-8: Design and Operate the Proposed Dry Boat Storage Facility to Comply with the City’s Noise Ordinance at the Adjacent Proposed RV Resort (GB Capital Component). During the architectural and engineering design phase for the dry boat storage facility, prior to the issuance of any building permits for such, the project proponent for the GB Capital Component shall retain an acoustical consultant to evaluate the design and provide recommendations, as necessary, to ensure that operation of the dry boat storage facility will comply with the City’s Noise Ordinance (Municipal Code Chapter 12.06.020) at the adjacent RV sites during the sensitive evening and nighttime hours of 7:00 p.m. to 7:00 a.m. (i.e., 65 dBA Leq between 7 p.m. and 10 p.m., and 60 dBA Leq between 10 p.m. and 7 a.m.).

Noise control techniques may include, but are not limited to, restricting hours of operation to daytime hours (7:00 a.m. to 7:00 p.m.), selecting quieter equipment (when commercially available), or installing additional noise barriers to screen the facility from the RV resort. The project proponent shall submit a copy of the

Page 106 of 222 ends
Page 95 of 137 ends

acoustical consultant’s report, along with evidence that all design features have been incorporated into the project design (to ensure that operation of the dry boat storage facility would comply with the City Noise Ordinance at the adjacent RV sites during the sensitive evening and nighttime hours), to the District’s Development Services Department for review and approval prior to commencement of construction of the dry boat storage facility. The project proponent shall implement the noise control techniques.

MM-NOI-9: Regulate Organized Events at Pepper Park, Including Use of the Proposed Amphitheater (Balanced Plan). Organized events at Pepper Park shall be properly regulated for noise control. Per Section 8.02 of the District’s Port Code, any event with over 25 attendees shall obtain a permit from the District. As further stipulated by Section 8.02 of the Port Code, each “permit shall be subject to the requirements regarding noise…as contained in the Municipal Code of the particular City in which the park is located.” Therefore, any event for which noise generating activities will occur at the amphitheater will be subject to the City’s Noise Ordinance. Although the City’s Noise Ordinance indicates that daytime and nighttime noise standards would be 65 and 60 dBA Leq(h), respectively, at the GB Capital Component visitor accommodations (RV resort and hotels), the City’s Noise Ordinance also includes exceptions for these noise standards; the exceptions are on a case-by-case basis and include temporary noise exceedances for organized events (e.g., parades, concerts). Further, as part of the District’s permitting process for organized events that are proposed to have amplified sounds (e.g., concerts), the District shall coordinate with the City, and if the City requires a maximum decibel level limit or hours in which all noise needs to cease, that information shall be added to the District permit for that organized event. In addition, the District shall coordinate notification to adjacent tenants of upcoming organized large events, and the permittee of the organized event shall coordinate with the same tenants within 2 weeks of the organized event.

Implementation of mitigation measures MM-NOI-8 and MM-NOI-9 would reduce Impact-NOI-5. However, it is possible that full implementation of MM-NOI-8 would not be feasible due to factors such as the type of mechanical equipment required to lift and transport boats, the desired hours of operation (including the sensitive evening and nighttime hours), the proximity to the RV sites, and the difficulty in providing effective shielding given the height of the storage structure and the southerly access to the facility from Marina Way. Mitigation measure MM-NOI-9 would ensure that events at Pepper Park would be conducted in compliance with local requirements including obtaining and complying with the terms of an applicable event permit granted by the District and coordination with the City and adjacent tenants. Therefore, potential noise impacts associated with operation of Pepper Park would be reduced to less than significant with implementation of MMNOI-9. However, given the uncertainty associated with implementing adequate noise control, Impact-NOI-5 would remain potentially significant and unavoidable with respect to noise from the dry boat storage facility and a Statement of Overriding Considerations pursuant to State CEQA Guidelines §15093 is required.

Page 107 of 222 ends
Page 96 of 137 ends

4.9.6 Impact-NOI-6: Exceedance of Caltrans Guideline Criteria for Potential Building Damage During Project Construction (GB Capital Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on noise and vibration (Impact-NOI-6) associated with vibration levels from pile driving which could exceed Caltrans Guideline Criteria during construction of Hotel #3 at the GB Capital Component. Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.10, Noise and Vibration.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on noise and vibration (Impact-NOI-6) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on noise and vibration (Impact-NOI-6) is analyzed in Volume 2 (Final EIR), Section 4.10, Noise and Vibration. Potential Impact-NOI-6 would result from vibration levels from pile driving which could exceed 0.5 in/sec at the closest structure (Waterfront Grill at the Pier 32 Marina) during construction of Hotel #3 at the GB Capital Component.

The potentially significant impact on noise and vibration (Impact-NOI-6) would be reduced by mitigation measure MM-NOI-10: Avoid or Reduce Groundborne Vibration from Pile Driving (GB Capital Component). This mitigation measure is set forth in full in the MMRP and Table 2-3 in the Executive Summary of the Final EIR and provides as follows:

MM-NOI-10: Avoid or Reduce Groundborne Vibration from Pile Driving (GB Capital Component). Where feasible, the project proponent for the GB Capital Component shall require its construction contractor(s) to avoid pile driving within a 32-foot buffer zone of existing buildings at the Pier 32 Marina. If piling cannot be avoided within this distance, the following shall be implemented:
• Alternative installation methods shall be used, such as press-in piles or drilled piles (e.g., cast-in-drilled-hole, poured-in-place piles). • The following steps shall be taken to protect buildings within 32 feet of piledriving locations:
o The project proponent/contractor shall retain a qualified structural or geotechnical engineer to conduct preconstruction surveys of neighboring structures (including photographing and/or videotaping) to document existing building conditions for future comparison if any vibration-related damage is suspected or results from constructionrelated activities; and

Page 108 of 222 ends
Page 97 of 137 ends

o Based on review of the specific buildings involved, the structural/ geotechnical engineer may provide updated vibration thresholds and buffer distances for potentially affected buildings; and

o Monitoring shall be conducted during construction to check for vibrationrelated damage during pile driving; such monitoring shall include vibration measurements obtained inside or outside of the buildings or other tests and observations deemed necessary; and
o The person(s) conducting the monitoring shall have the authority to issue a stop work order to the pile-driving contractor if excessive vibration levels are measured or other observations occur that indicate potential building damage may occur; in the event of such an occurrence, the monitor shall notify the project proponent (GB Capital) and the District; and
o If any damage to existing buildings is determined to occur as a result of pile driving at the GB Capital Component, the project proponent shall be financially responsible for the necessary repairs, structural or cosmetic, to return the damaged building to its pre-existing state.

Implementation of mitigation measure MM-NOI-10 would reduce Impact-NOI-6 to less-than-significant levels because the measure would ensure that buildings located close to proposed pile driving would be protected from potential damage or repaired if any cosmetic or structural damage was to occur.

4.9.7 Impact-NOI-7: Exceedance of Caltrans Guideline Criteria for Potential Human Annoyance During Project Construction (Bayshore Bikeway Component)
Potentially Significant Impact: The EIR identifies a potentially significant impact on noise and vibration (Impact-NOI-7) associated with vibration levels from vibratory rollers (compactors) or heavy earthmoving equipment which could exceed Caltrans Guideline Criteria at the closest residential structures during construction of the proposed Bayshore Bikeway. Detailed information and analysis regarding this potentially significant impact are provided in Volume 2 (Final EIR), Section 4.10, Noise and Vibration.

Finding: Pursuant to State CEQA Guidelines §15091(a)(1), changes or alterations have been required or incorporated in the approved project that avoid or substantially lessen the significant environmental effects on noise and vibration (Impact-NOI-7) as identified in the EIR.

Facts in Support of Finding: The potentially significant impact of the proposed project on noise and vibration (Impact-NOI-7) is analyzed in Volume 2 (Final EIR), Section 4.10, Noise and Vibration. Potential Impact-NOI-7 would result from vibration levels due to vibratory rollers (compactors) or heavy earthmoving

Page 109 of 222 ends