Tom Bertulis, MS, PE, PTOE
Senior Associate, KTUA
[email protected]
Installation Resiliency Study: National City
City Council Meeting January 16, 2023
Agenda and Project Team
• Grant Funding and Project Extents
• Analysis Summary
• Project Selection and Ranking
• Project Concepts
About the Project
• A Resiliency Planning Grant
• The grant was received by:
○ City of National City
○ in partnership with Naval Base San Diego,
○ involves projects both in National City and San Diego • Funded from the Office of Local Defense Community Cooperation (OLDCC) OLDCC Resiliency Grant
Purpose/Needs

1. Encouraged coordination & collaboration between local agencies as needed to build consensus on project priorities that address:
a. transportation,
b. traffic, and
c. parking needs around NBSD.

1. Utilized SANDAG’s Military Working Group (MWG) members as an Advisory Committee.

1. The Policy Committee (Mayor, Vice Mayor, DPW Director, NBSD Rep) reviewed the Study, made final recommendations reflected in the Study.

Traffic Analysis
Traffic Congestion Collisions Walksheds
OLDCC Study area in yellow
Existing Planning Documents Research
SANDAG Regional
Military Multimodal
Access Strategy
Port of San Diego:

Harbor Drive
Multimodal Corridor
Study
Naval Base San Diego
Parking and Traffic
Congestion Relief
Plan
Additional documents
• 8
th Street and
Roosevelt Ave
Caltrans ATP Grant
• Roosevelt Ave Smart
Growth
• National City Marina
District Balanced
Land Use Plan, 2016
• National City
Integrated
Neighborhoods
Study (Intraconnect)
• & more!
• Close to 180
Planned Projects
identified
•Safety : Density of collisions
•Congestion : Average Peak Period Congestion (Volume / Capacity) •Connectivity : Proximity to NBSD Gate, STRAHNET Corridors •Pedestrian : Quality of Facilities: Sidewalks, Buffers, Crossings •Bicycle : Level of Traffic Stress based on Speed, # Lanes, Bike Facility Type KEY TAKEAWAY: Several projects
in or nearing construction that
need to be completed before
these projects can effectively be
finalized and moved forward:

1. Harbor Drive 2.0 Project

2. Vesta Street Bridge Project

3. 8th St/Roosevelt ATP Project

4. Bayshore Bikeway Phase 4
Project

PRELIMINARY CONCEPT
8th Street: Bridge
Over Paleta Creek
Main Street PRELIMINARY CONCEPT

PRELIMINARY

CONCEPT
8th Street: Bridge
Over Harbor Drive
Tom Bertulis, MS, PE, PTOE
Senior Associate, KTUA Urban Planning and Landscape Architecture [email protected]
Thank You