Crealed in CAPS: 4.38.1089
Quole Date: 6-13-2022
Model: EAD-635
Mark: EAD
PRODUCT DETAILS
Frame:
Frame Type:
Blades:
Material:
Sizing:
Blade Seal:
Jamb Seal:
Axle Bearings:
Axle Material:
Shape:
Construction:
6 in. x 0.081 in. Frame Thickness
Channel
0.081 in. Adjustable Blade Thickness
Aluminum
1/4 Inch Under
Yes
Yes
Synthetic
Steel
Rectangular
Mechanically Fastened
OPTIONS & ACCESSORIES
Finish:
Finish Performance:
Coating Type:
Color:
Bird Screen:
Mounting:
Union Label:
Warranty:
Painted
AAMA2604
Hi~Pro Polyester
Concrete Gray~RAL 7023
0.75 in. x 0.05 in., Flat Expanded Aluminum, Internal,
Mill Finish
Clip Angles
No Preference
1 year Standard Product Warranty
NIA Finish Warranty
Total Louver Qty: 1 Total Weight (lb):49 Louver Area
Total Ship Sect.: 1
.. Weight shown is an estimate on!y based on the default base product configuration without options or accessories.
Larger openings may require field assembly of mulUp!e louver panels to make up !he overall opening size. Individual louver panels are designed to withstand wind!oads up to a maximum of 25 PSF (size and configuration dependent). Design, materials and installation of structural reinforcement required to adequately support large sections or multiple section assemblies within a large opening are not provided by Greenheck. Unless specifically indicated, the following are NOT included in the quote provided: structural steel, installation hardware (anchors, angle dips, continuous angles, shims, fasteners, inserts, backer rod and sealant), field measuring and/or installation, miscellaneous flashing, trim or enclosures, blank off panels, mullion covers or mulllon hardware, hinged frames or removable subframes, custom bird/insect screen, 3-coat, metamc and/or exotic paint finishes, bituminous paints for unlike metals, any applicable taxes, stamped and sealed structural calculations seismic calculations or job specific engineered submittal drawings.
Direct Drive Upblast Centrifugal Wall Exhaust Fan
Model:
Mark:
CUE-160-VG
MK-1 (ALT)
Quantity:
Volume:
Total External SP
FRPM:
Motor Power:
Voltage:
Phase:
Cycles:
Product Summary
3,351 CFM
1.974 in. wg
1725 RPM
2 hp
230
1 60 Cycle
Fan Model: CUE-160-VG
Base - CUE Fan
Motor- High Efficiency Brushless DC -2 hp, TEFC, 230/60/1, 1725 rpm - Factory Mounted Motor and Drive Accessories
Motor - Vari-Green EC motor
Control - Dial for balancing
Accessories
Larger Curb Cap Size - 26 Square
Sidewall Mounting - Fan Configured for Wall-Mounted Applications Wall Bracket will be Mounted to the Wall
UUcUL 705 Listed - "Power Ventilators"
Switch, NEMA-1, Toggle, Shipped with Unit
Junction Box Mounted & Wired
Wall Bracket - Galvanized, Under Sized 0.5 in. (Shipped Loose) (PN 916829), Coated Project: Lillyhill and L Street Water Booster Pump Page 2 of 4 Stations
Created in CAPS: 4.38.1089
Quote Date: 6-13-2022
Damper Shipped Loose, WD-330-PB-16X16, Gravity Operated, Coated Coated with Hi-Pro Polyester, Concrete Gray-RAL 7023, Fan And Attached Ace Birdscreen: Aluminum, nom. 86% Free Area
Unit Warranty: 1 Yr (Standard)
Project: Lillyhill and L Street Water Booster Pump
Stations
Created in CAPS: 4.38.1089
City of Needles, California
Request for City Council Action
IZJ CITY COUNCIL □ NPUA □ RDA [gj Regular D Special
Meeting Date: October 25, 2022
Title: Resolution No. 2022-72 authorizing the City Manager or his designee, the Community Services Manager, to purchase one (1) 18-Passenger Transit Vehicle for use by the Needles Area Transit
Background: $150,000 has been budgeted in the 2022-2023 fiscal year for the purchase of a new NAT bus, funding which will come from State Transit Assistance (STA) Capital through the San Bernardino County Transportation Authority (SBCTA). This resolution will allow the city to purchase through the California Association for Coordinated Transportation (CalACT)/ Morongo Basin Transit Authority (MBTA) Vehicle Purchasing Cooperative which reduces the cost and saves staff time in going through a formal bidding process (the Cooperative has already done it).
In accordance with the California Air Resource Board Innovative Clean Transportation regulations, as of January 2026, the City will have to begin converting 25% of all new bus purchases to zero emissions (ZE) with 100% of all new bus purchases being ZE beginning January 2029. 100% of the fleet must be ZE by January 2040. Staff is working with SBCTA on compliance and conversion of transit buses and required infrastructure to meet the state deadlines.
Fiscal Impact: $150,000 has been budgeted in line item #525-4770-461. 72-15 and will be reimbursed by SBCTA after the purchase is complete ~
Environmental Impact: N/A
Recommended Action: Waive the reading and adopt Resolution No. 2022-72 authorizing the City Manager or his designee, the Community Services Manager, to purchase one ( 1) 18-Passenger Transit Vehicles for use by the Needles Area Transit.
Submitted By: Chery Sallis, Community Services Manager
City Management Review:
Approved □ Not Approved □ Tabled □ Other: □
Agenda Item: __ q __ _
L:\transit svcs-sen cit\council cover sheet - resol re NAT vehicle purch thru CalACT-MBTA (Oct '22).doc RESOLUTION NO. 2022-72
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF NEEDLES, CALIFORNIA, AUTHORIZING THE
CITY MANAGER OR HIS DESIGNEE, THE COMMUNITY
SERVICES MANAGER, TO PURCHASE ONE(!)
IS-PASSENGER TRANSIT VEHICLE FOR USE BY
THE NEEDLES AREA TRANSIT
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Needles, California, does hereby authorize the California Association for Coordinated Transportation (CalACT)/Morongo Basin Transit Authority (MBTA) Vehicle Purchasing Cooperative to purchase one (1) IS-passenger transit vehicle for and on behalf of the City of Needles, and that Rick Daniels, City Manager, or his designee, Cheryl K. Sallis, Community Services Manager, are hereby authorized and directed to sign and deliver all necessary requests and documents in connection therewith for and on behalf of the City of Needles. The total price of the one ISpassenger transit vehicle for use by the Needles Area Transit shall not exceed $150,000.
PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council of the City of Needles, California, held on the 25th day of October, 2022, by the following roll call vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Mayor
(SEAL)
ATTEST: ______________ _
City Clerk
APPROVED AS TO FORM:
City Attorney
L:\transit svcs-sen cit\resolution re purchase of new NAT vehicle (Oct '22).doc/cks Requested Action
City of Needles, California
~---------------------------------------------------------~ ~ CITY COUNCIL □ UTILITY BOARD □ NPUA ~ Regular D Special Meeting Date:
Title:
Background:
October 25, 2022
Accept TKE Engineer's proposal to provide Professional Engineering Services for the design of Phase IV Street Improvements and Water Service Replacement Project in the amount not to exceed $42,000.
On Oct. 2, 2019, the City adopted a Pavement Management Plan (PMP) prepared by Epic Engineering who performed a pavement condition evaluation of all Citymaintained roadways. The PMP included recommended asphalt treatments to each roadway and prioritized streets for repair based on a comprehensive scoring system.
Phase Ill Street Improvements are currently under construction and Phase IV Streets have been identified for design and construction this FY. · Phase IV design will include the following street segments for Paving and other Slurry work.
Phase 4A:
Desoto Street - Parkway Street to Balboa Ave
Carty Way - El Monte Street to Coronado Ave
Carty Place - Carty Way to Cul-de-sac
Carty Circle - Carty Way to Cul-de-sac
El Monte Street - Parkway Street to Coronado Ave
Phase 4B:
I Street - Third Street to W. Broadway Ave
H Street - Third Street to W. Broadway Ave
G Street - Third Street to W. Broadway Ave
Crestview Drive - South of third Street
F Street - Third Street to W. Broadway
F Street - Third Street to Army Road
Fiscal Impact: A total not to exceed $42,000 to provide engineering services to complete the design and contract documents for the project; being funded !!ublic Works Streets Improvements balance of $878,638.44. - ~~__.,__ __ Sylvia Miledi Recommendation: Accept TKE Engineer's proposal to provide Professional Engineering Services for the design of the Phase IV Street Improvements and Water Service Replacement project in the amount not to exceed $42,000 and authorize staff to execute a new task between City & TKE Engineer's for said work.
Date:
~---------------------------------------------------------~ D Approved: D Not Approved: D Tabled: D Other: Agenda No. . .ct ERING
September 7, 2022
Ms. Tammy Ellmore
Engineering Tech II
City of Needles
817 Third Street
Needles CA 92363
TKE ENGINEERING, INC.
Subject: Proposal to Provide Professional Engineering Services for the Design of the Phase IV Street Improvements and Water Service Replacement Project
Dear Ms. Ell more:
Thank you for the opportunity to submit a proposal to provide professional engineering services for the subject project. The City of Needles (City) desires to retain a consultant to aid in completing the design of street improvements and water service replacements along various streets. More specifically, the Phase IV Project scope includes crack fill and slurry sealing, grind and overlay of existing AC pavement, and spot full depth AC removal and replacement repairs, and replacement of water services along the following streets:
Phase 4 A (2" Grind and Overlay with Petromat)
• Desoto Street - Parkway Street to Balboa Avenue
• Carty Way - El Monte Street to Coronado Avenue
• Carty Place - Carty Way to Cul-de-sac
• Carty Circle - Carty Way to Cul-de-sac
• El Monte Street - Parkway Street to Coronado Avenue
Phase 4 B (2" Grind and Overlay with Petromat, *unless otherwise noted) • I Street - Third Street to W. Broadway Avenue *4" Grind and Pave • H Street - Third Street to W. Broadway Avenue
• G Street - Third Street to W. Broadway Avenue
• Crestview Drive - South of Third Street
• F Street - Third Street to West Broadway Avenue *Crack Fill and Slurry Seal • F Street - Third Street to Army Road
2305 Chicago Ave Riverside CA 92507
Ph. (951) 680-0440 Fax (951) 680-0490
www.tkeengineering.com
Letter to Ms. Tammy Ellmore
Phase IV Street and Water Improvement Design Proposal Page 3 of 4 TKE will forward the preliminary design drawings to the City for review. Upon completion of the City's review, TKE will meet with staff to gather comments and receive direction for the final design.
Task 3. Final Design
We will incorporate the City's preliminary design comments, refine the design as required, and provide the City final drawings, including hard (mylar drawings and specifications) and digital (PDF and Word) copies of the drawings, and specifications for final approval and bidding.
Task 4. Bidding Assistance
TKE will provide project pre-award services as needed including but not limited to preparation of response to RFI's during bid period, preparation of addenda as required, and attend pre-bid job walk for technical assistance. Lastly, TKE will assist the City with review of bid proposals in accordance with the contract documents.
FEE
Our budget to provide the services described is as follows:
Description
1. Records Research
2. Preliminary Design
3. Final Design
4. Bidding Assistance
Total:
Amount
$ 1,000
$ 24,000
$14,000
$ 3.000
$42,000
TKE's proposed project fee of $42,000 will include preparation of construction drawings which will include 12 sheets (i.e. title sheet, note sheet, nine plan only sheets, and one detail sheet). We will invoice the City monthly in accordance with our rate schedule. Our invoice will not exceed the amount presented above without prior approval.
SCHEDULE
TKE anticipates completing preliminary design within 8 weeks of receiving notice to proceed. Thereafter, TKE anticipates completing the final design within 4 weeks of receiving City comments.
ENGINEERING, INC.
RATE SCHEDULE
2022- 2023
Principal in Charge .................................................................................. ..
Project Manager/Construction Manager/Licensed Surveyor ........................ .
Senior Engineer/Project Engineer (PE)/Senior Plan Checker ....................... .
Assistant Project Manager/Associate Engineer .......................................... ..
Assistant Engineer/Plan Checker/Designer ................................................. .
AutoCAD Technician ................................................................................. .
Engineering Technician ............................................................................. .
Clerical ................................................................................................. ..
Forensic Engineering ................................................................................ .
Expert Witness Testimony ....................................................................... .
SURVEYING SERVICES
2-Man Survey Crew (Prevailing Wage) ....................................................... .
CONSTRUCTION SERVICES
Senior Construction Inspector (Prevailing Wage) ........................................ .
Construction Inspector (Prevailing Wage) .................................................. ..
REIMBURSABLE COSTS
In-house Reproduction ............................................................................. .
Printing and Materials ............................................................................... .
Express Mail/Courier/Next Day Service ..................................................... .
Special Subconsultant Services ................................................................ .
HOURLY
RATE
$175.00
$165.00
$155.00
$145.00
$135.00
$125.00
$ 90.00
$ 85.00
$250.00
$350.00
$240.00
$120.00
$110.00
Cost
Cost+ 10%
Cost+ 10%
Cost+ 10%
Revised June 2022
City of Needles Capital Projects
Street Improvements & Water Service Replacement
PHASE4A
~ i
~ :
_l ll l l ll ll Jl 111111 11 J
RIO VISTA
~r I I I I I I I I l~ ~~ i l I I I I I I I Ji
PERU
[ I I I I I I I l
f I I J l I I I I I I I J
DESOTO
CARTY WAY
,.,_,_ r: -.-'---.-----I i 1'-----r...J........,-£-.--------,-----+----,-------r------r-'--1 11 '--'
: II i!
:: :i
: __ _______ _ 1 ! -------! l _____ ______ ____ __ ____ ___ ___ :
·'
EL MONTE
~f I I I I I l [---- ; - -1:
0 ~ ____________.
~ a:~ I I I I I J .~ . : ,,
,, LILL YHILL DRIVE
~ I I I I I l r I I I I 111 I I : 1 I 11
LEGEND
PHASE 4A • PAVING IMPROVEMENTS
including Water Services
City of Needles Capital Projects
Street Improvements & Water Service Replacement
PHASE 4 B
LEGEND
PHASE 4B • PAVING IMPROVEMENTS
including Water Services