Cities Index.
Agenda packet

Needles City Council
April 9, 2024

Document
Agenda packet
Meeting
April 9, 2024
Body
Needles City Council
Pages
19
Original file
45.6 MB
Text extracted from the city's file for reading and search. Open the original on cityofneedlesca.api.civicclerk.com. That file is the official record.

PART II: PBV OWNER PROPOSALS
17-II.A. OVERVIEW
With certain exceptions, the PHA must describe the procedures for owner submission of PBV proposals and for PHA selection of PBV proposals [24 CFR 983.51]. Before selecting a PBV proposal, the PHA must determine that the PBV proposal complies with HUD program regulations and requirements, including a determination that the property is eligible housing [24 CFR 983.53 and 983.54], complies with the cap on the number of PBV units per project [24 CFR 983.56], and meets the site selection standards [24 CFR 983.57]. The PHA may not commit PBVs until or unless it has followed the proposal selection requirements defined in 24 CFR 983.51 [Notice PIH 2011-54].
17-II.B. OWNER PROPOSAL SELECTION PROCEDURES [24 CFR 983.51(b)] The PHA must select PBV proposals in accordance with the selection procedures in the PHA administrative plan. The PHA must select PBV proposals by either of the following two methods.
• PHA request for PBV Proposals. The PHA may solicit proposals by using a request for proposals to select proposals on a competitive basis in response to the PHA request. The PHA may not limit proposals to a single site or impose restrictions that explicitly or practically preclude owner submission of proposals for PBV housing on different sites. • The PHA may select proposal that were previously selected based on a competition. This may include selection of a proposal for housing assisted under a federal, state, or local government housing assistance program that was subject to a competition in accordance with the requirements of the applicable program, community development program, or supportive services program that requires competitive selection of proposals (e.g., HOME, and units for which competitively awarded LIHTCs have been provided), where the proposal has been selected in accordance with such program's competitive selection requirements within three years of the PBV proposal selection date, and the earlier competitive selection proposal did not involve any consideration that the project would receive PBV assistance. The PHA need not conduct another competition.

Units Selected Non-Competitively [FR Notice 1/18/17; Notice PIH 2017-21; 24 CFR 983.51(b)]
For certain public housing projects where the PHA has an ownership interest or control, the PHA may attach PBV assistance non-competitively without following one of the two processes above.

This exception applies when the PHA is engaged in an initiative to improve, develop, or replace a public housing property or site. The public housing units may either currently be in the public housing inventory or may have been removed from the public housing inventory within five years of the date on which the PHA entered into the AHAP or HAP.

If the PHA is planning rehabilitation or new construction on the project, a minimum threshold of $25,000 per unit in hard costs must be expended.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

If the PHA plans to replace public housing by attaching PBV assistance to existing housing in which the PHA has an ownership interest or control, then the $25,000 per unit minimum threshold does not apply as long as the existing housing substantially complies with NSPIRE standards.

The PHA must include in the administrative plan what work it plans to do on the property or site and how many PBV units will be added to the site.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Solicitation and Selection of PBV Proposals [24 CFR 983.51(c)] PHA procedures for selecting PBV proposals must be designed and actually operated to provide broad public notice of the opportunity to offer PBV proposals for consideration by the PHA.

The public notice procedures may include publication of the public notice in a local newspaper of general circulation and other means designed and actually operated to provide broad public notice. The public notice of the PHA request for PBV proposals must specify the submission deadline. Detailed application and selection information must be provided at the request of interested parties.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

The PHA will rate and rank proposals for rehabilitated and newly constructed housing using the following criteria:

Owner experience and capability to build or rehabilitate housing as identified in the RFP;
Extent to which the project furthers the PHA goal of deconcentrating poverty and expanding housing and economic opportunities;
If applicable, the extent to which services for special populations are provided on site or in the immediate area for occupants of the property; and In order to promote partially assisted projects, projects where less than 25 percent of the units will be assisted will be rated higher than projects where 25 percent or more of the units will be assisted. In the case of projects for occupancy by the elderly, persons with disabilities or families needing other services, the PHA will rate partially assisted projects on the percentage of units assisted. Projects with the lowest percentage of assisted units will receive the highest score.

PHA Requests for Proposals for Existing Housing Units
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

PHA Selection of Proposals Subject to a Previous Competition under a Federal, State, or Local Housing Assistance Program
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

PHA-Owned Units [24 CFR 983.51(e), 983.59, FR Notice 1/18/17, and Notice PIH 2017-21] A PHA-owned unit may be assisted under the PBV program only if the HUD field office or HUD-approved independent entity reviews the selection process and determines that the PHAowned units were appropriately selected based on the selection procedures specified in the PHA administrative plan. This also applies to noncompetitive selections. If the PHA selects a proposal for housing that is owned or controlled by the PHA, the PHA must identify the entity that will review the PHA proposal selection process and perform specific functions with respect to rent determinations, the term of the HAP contract, and inspections.

In the case of PHA-owned units, the term of the HAP contract and any HAP contract renewal must be agreed upon by the PHA and a HUD-approved independent entity. In addition, an independent entity must determine the initial rent to owner, the redetermined rent to owner, and reasonable rent. NSPIRE inspections must also be conducted by an independent entity.

The independent entity that performs these program services may be the unit of general local government for the PHA jurisdiction (unless the PHA is itself the unit of general local government or an agency of such government) or another HUD-approved public or private independent entity.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

PHA Notice of Owner Selection [24 CFR 983.51(d)]
The PHA must give prompt written notice to the party that submitted a selected proposal and must also give prompt public notice of such selection. Public notice procedures may include publication of public notice in a local newspaper of general circulation and other means designed and actually operated to provide broad public notice.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.
17-II.C. HOUSING TYPE [24 CFR 983.52]
The PHA may attach PBV assistance for units in existing housing or for newly constructed or rehabilitated housing developed under and in accordance with an agreement to enter into a housing assistance payments contract that was executed prior to the start of construction. A housing unit is considered an existing unit for purposes of the PBV program, if, at the time of notice of PHA selection, the units substantially comply with NSPIRE standards. Units for which new construction or rehabilitation began after the owner's proposal submission but prior to the execution of the HAP do not subsequently qualify as existing housing. Units that were newly constructed or rehabilitated in violation of program requirements also do not qualify as existing housing.

The PHA must decide what housing type, new construction, rehabilitation, or existing housing, will be used to develop project-based housing. The PHA choice of housing type must be reflected in its solicitation for proposals.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-II.D. PROHIBITION OF ASSISTANCE FOR CERTAIN UNITS
Ineligible Housing Types [24 CFR 983.53]
The PHA may not attach or pay PBV assistance to shared housing units; units on the grounds of a penal reformatory, medical, mental, or similar public or private institution; nursing homes or facilities providing continuous psychiatric, medical, nursing services, board and care, or intermediate care (except that assistance may be provided in assisted living facilities); units that are owned or controlled by an educational institution or its affiliate and are designated for occupancy by students; manufactured homes; and transitional housing. In addition, the PHA may not attach or pay PBV assistance for a unit occupied by an owner and the PHA may not select or enter into an agreement to enter into a HAP contract or HAP contract for a unit occupied by a family ineligible for participation in the PBV program. A member of a cooperative who owns shares in the project assisted under the PBV program is not considered an owner for purposes of participation in the PBV program. Finally, PBV assistance may not be attached to units for which construction or rehabilitation has started after the proposal submission and prior to the execution of an AHAP.

Subsidized Housing [24 CFR 983.54]
A PHA may not attach or pay PBV assistance to units in any of the following types of subsidized housing:
• A public housing unit;
• A unit subsidized with any other form of Section 8 assistance; • A unit subsidized with any governmental rent subsidy; • A unit subsidized with any governmental subsidy that covers all or any part of the operating costs of the housing;
• A unit subsidized with Section 236 rental assistance payments (except that a PHA may attach assistance to a unit subsidized with Section 236 interest reduction payments); • A Section 202 project for non-elderly with disabilities; • Section 811 project-based supportive housing for persons with disabilities; • Section 202 supportive housing for the elderly;
• A Section 101 rent supplement project;
• A unit subsidized with any form of tenant-based rental assistance; • A unit with any other duplicative federal, state, or local housing subsidy, as determined by HUD or the PHA in accordance with HUD requirements.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-II.E. SUBSIDY LAYERING REQUIREMENTS [24 CFR 983.55, Notice PIH 2013-11, and FR Notice 3/13/23]
The subsidy layering review is intended to prevent excessive public assistance by combining (layering) housing assistance payment subsidy under the PBV program with other governmental housing assistance from federal, state, or local agencies, including assistance such as tax concessions or tax credits.

HUD requires new construction and rehabilitation housing that will include forms of governmental assistance other than PBVs to undergo a subsidy layering review (SLR) prior to entering into an Agreement to Enter into Housing Assistance Payments Contract (AHAP).

Subsidy layering requirements do not apply to existing housing, when PBV is the only governmental assistance, or for projects already subject to a PBV HAP contract, even if the project is recapitalized with outside sources of funding.

When a PHA selects a new construction or rehabilitation project, the PHA must require information regarding all HUD and/or other federal, state, or local governmental assistance to be disclosed by the project owner using Form HUD-2880. Appendix A of FR Notice 3/23/23 contains a list of all required documentation.

Either HUD or a HUD-approved housing credit agency (HCA) in the PHA’s jurisdiction performs the subsidy layering review. The PHA must request an SLR through their local HUD Field Office or, if eligible, through a participating HCA.

If the SLR request is submitted to an approved HCA, and the proposed project-based voucher assistance meets HUD subsidy layering requirements, the HCA must submit a certification to HUD and notify the PHA. The PHA may proceed to execute an AHAP at that time if the environmental approval is received.

The HAP contract must contain the owner’s certification that the project has not received and will not receive (before or during the term of the HAP contract) any public assistance for acquisition, development, or operation of the housing other than assistance disclosed in the subsidy layering review in accordance with HUD requirements.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-II.F. CAP ON NUMBER OF PBV UNITS IN EACH PROJECT
25 Percent per Project Cap [24 CFR 983.56, FR Notice 1/18/17, and Notice PIH 2017-21] In general, the PHA may not select a proposal to provide PBV assistance for units in a project or enter into an agreement to enter into a HAP or a HAP contract to provide PBV assistance for units in a project, if the total number of dwelling units in the project that will receive PBV assistance during the term of the PBV HAP contract is more than the greater of 25 units or 25 percent of the number of dwelling units (assisted or unassisted) in the project.

Exceptions to 25 Percent per Project Cap [FR Notice 1/18/17; Notice PIH 2017-21; FR Notice 1/24/22]
As of April 18, 2017, units are not counted against the 25 percent or 25-unit per project cap if:
• The units are exclusively for elderly families
• The units are for households eligible for supportive services available to all families receiving PBV assistance in the project
− If the project is located in a census tract with a poverty rate of 20 percent or less, as determined in the most recent American Community Survey Five-Year estimates, the project cap is the greater of 25 units or 40 percent (instead of 25 percent) of the units in the project [FR Notice 7/14/17].

The Housing Opportunity Through Modernization Act of 2016 (HOTMA) eliminated the project cap exemption for projects that serve disabled families and modified the exception for supportive services.

Under the Fostering Stable Housing Opportunities (FSHO) amendments, units exclusively made available to youth receiving FUPY/FYI assistance may be excepted from the project cap for HAP contracts first effective after December 27, 2020. For more information on excepted units for FUPY, see Chapter 19.

Projects where these caps were implemented prior to HOTMA (HAP contracts executed prior to April 18, 2017) or FSHO (contract in effect on or prior to December 27, 2020) may continue to use the former exceptions and may renew their HAP contracts under the old requirements, unless the PHA and owner agree to change the conditions of the HAP contract. However, this change may not be made if it would jeopardize an assisted family’s eligibility for continued assistance in the project.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Supportive Services
PHAs must include in the PHA administrative plan the type of services offered to families for a project to qualify for the exception and the extent to which such services will be provided. As of April 18, 2017, the project must make supportive services available to all families receiving PBV assistance in the project, but the family does not actually have to accept and receive supportive services for the exception to apply to the unit, although the family must be eligible to receive the supportive services. It is not necessary that the services be provided at or by the project but must be reasonably available to families receiving PBV assistance at the project and designed to help families in the project achieve self-sufficiency or live in the community as independently as possible A PHA may not require participation in the supportive service as a condition of living in the excepted unit, although such services may be offered.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Projects not Subject to a Project Cap [FR Notice 1/18/17; Notice PIH 2017-21] PBV units that were previously subject to certain federal rent restrictions or receiving another type of long-term housing subsidy provided by HUD are exempt from the project cap. In other words, 100 percent of the units in these projects may receive PBV assistance.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Promoting Partially Assisted Projects [24 CFR 983.56(c)] A PHA may establish local requirements designed to promote PBV assistance in partially assisted projects. A partially assisted project is a project in which there are fewer units covered by a HAP contract than residential units [24 CFR 983.3].

A PHA may establish a per-project cap on the number of units that will receive PBV assistance or other project-based assistance in a multifamily project containing excepted units or in a singlefamily building. A PHA may also determine not to provide PBV assistance for excepted units, or the PHA may establish a per-project cap of less than 25 units or 25 percent of units.

HACN Policy:

This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-II.G. SITE SELECTION STANDARDS
Compliance with PBV Goals, Civil Rights Requirements, and NSPIRE Site Standards [24 CFR 983.57(b)]
The PHA may not select a proposal for existing, newly constructed, or rehabilitated PBV housing on a site or enter into an agreement to enter into a HAP contract or HAP contract for units on the site, unless the PHA has determined that PBV assistance for housing at the selected site is consistent with the goal of deconcentrating poverty and expanding housing and economic opportunities. The standard for deconcentrating poverty and expanding housing and economic opportunities must be consistent with the PHA Plan under 24 CFR 903 and the PHA administrative plan.

In addition, prior to selecting a proposal, the PHA must determine that the site is suitable from the standpoint of facilitating and furthering full compliance with the applicable Civil Rights Laws, regulations, and Executive Orders, and that the site meets the NSPIRE site and neighborhood standards at 24 CFR 5.703.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Existing and Rehabilitated Housing Site and Neighborhood Standards [24 CFR 983.57(d)] The PHA may not enter into an agreement to enter into a HAP contract nor enter into a HAP contract for existing or rehabilitated housing until it has determined that the site complies with the HUD required site and neighborhood standards. The site must:
• Be adequate in size, exposure, and contour to accommodate the number and type of units proposed;
• Have adequate utilities and streets available to service the site; • Promote a greater choice of housing opportunities and avoid undue concentration of assisted persons in areas containing a high proportion of low-income persons; • Be accessible to social, recreational, educational, commercial, and health facilities and services and other municipal facilities and services equivalent to those found in neighborhoods consisting largely of unassisted similar units; and • Be located so that travel time and cost via public transportation or private automobile from the neighborhood to places of employment is not excessive.

New Construction Site and Neighborhood Standards [24 CFR 983.57(e)] In order to be selected for PBV assistance, a site for newly constructed housing must meet the following HUD required site and neighborhood standards:
• The site must be adequate in size, exposure, and contour to accommodate the number and type of units proposed;
• The site must have adequate utilities and streets available to service the site; • The site must not be located in an area of minority concentration unless the PHA determines that sufficient, comparable opportunities exist for housing for minority families in the income range to be served by the proposed project outside areas of minority concentration or that the project is necessary to meet overriding housing needs that cannot be met in that housing market area;
• The site must not be located in a racially mixed area if the project will cause a significant increase in the proportion of minority to non-minority residents in the area. • The site must promote a greater choice of housing opportunities and avoid undue concentration of assisted persons in areas containing a high proportion of low-income persons;
• The neighborhood must not be one that is seriously detrimental to family life or in which substandard dwellings or other undesirable conditions predominate; • The housing must be accessible to social, recreational, educational, commercial, and health facilities and services and other municipal facilities and services equivalent to those found in neighborhoods consisting largely of unassisted similar units; and • Except for housing designed for elderly persons, the housing must be located so that travel time and cost via public transportation or private automobile from the neighborhood to places of employment is not excessive.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-II.H. ENVIRONMENTAL REVIEW [24 CFR 983.58]
The PHA activities under the PBV program are subject to HUD environmental regulations in 24 CFR parts 50 and 58. The responsible entity is responsible for performing the federal environmental review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). The PHA may not enter into an agreement to enter into a HAP contract nor enter into a HAP contract until it has complied with the environmental review requirements.

In the case of existing housing, the responsible entity that is responsible for the environmental review under 24 CFR part 58 must determine whether or not PBV assistance is categorically excluded from review under the National Environmental Policy Act and whether or not the assistance is subject to review under the laws and authorities listed in 24 CFR 58.5.

The PHA may not enter into an agreement to enter into a HAP contract or a HAP contract with an owner, and the PHA, the owner, and its contractors may not acquire, rehabilitate, convert, lease, repair, dispose of, demolish, or construct real property or commit or expend program or local funds for PBV activities under this part, until the environmental review is completed.

The PHA must supply all available, relevant information necessary for the responsible entity to perform any required environmental review for any site. The PHA must require the owner to carry out mitigating measures required by the responsible entity (or HUD, if applicable) as a result of the environmental review.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles .

Page17-20
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

PART III: DWELLING UNITS
17-III.A. OVERVIEW
This part identifies the special housing quality standards that apply to the PBV program, housing accessibility for persons with disabilities, and special procedures for conducting NSPIRE inspections.
17-III.B. NATIONAL STANDARDS FOR THE PHYSICAL INSPECTION OF REAL ESTATE [24 CFR 983.101]
NSPIRE standards for the tenant-based program, including those for special housing types, generally apply to the PBV program. NSPIRE requirements for shared housing, manufactured home space rental, and the homeownership option do not apply because these housing types are not assisted under the PBV program.

Lead-based Paint [24 CFR 983.101(c)]
The lead-based paint requirements for the tenant-based voucher program do not apply to the PBV program. Instead, The Lead-based Paint Poisoning Prevention Act (42 U.S.C. 4821-4846), the Residential Lead-based Paint Hazard Reduction Act of 1992 (42 U.S.C. 4851-4856), and implementing regulations at 24 CFR Part 35, Subparts A, B, H, and R, and 40 CFR 745.227, apply to the PBV program.
17-III.C. HOUSING ACCESSIBILITY FOR PERSONS WITH DISABILITIES The housing must comply with program accessibility requirements of section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and implementing regulations at 24 CFR part 8. The PHA must ensure that the percentage of accessible dwelling units complies with the requirements of section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794), as implemented by HUD's regulations at 24 CFR 8, subpart C.

Housing first occupied after March 13, 1991, must comply with design and construction requirements of the Fair Housing Amendments Act of 1988 and implementing regulations at 24 CFR 100.205, as applicable. (24 CFR 983.102)
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-III.D. INSPECTING UNITS
Pre-selection Inspection [24 CFR 983.103(a)]
The PHA must examine the proposed site before the proposal selection date. If the units to be assisted already exist, the PHA must inspect all the units before the proposal selection date and must determine whether the units substantially comply with NSPIRE. To qualify as existing housing, units must substantially comply with NSPIRE on the proposal selection date. However, the PHA may not execute the HAP contract until the units fully comply with NSPIRE.

Pre-HAP Contract Inspections [24 CFR 983.103(b), FR Notice 1/18/17, and Notice PIH 2017-20]
The PHA must inspect each contract unit before execution of the HAP contract. The PHA may not provide assistance on behalf of the family until the unit fully complies with NSPIRE, unless the PHA has adopted a policy to enter into a HAP contract for units that fail the initial inspection as a result of only non-life-threatening conditions, or if the unit passed an alternative inspection.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Turnover Inspections [24 CFR 983.103(c)]
Before providing assistance to a new family in a contract unit, the PHA must inspect the unit.

The PHA may not provide assistance on behalf of the family until the unit fully complies with NSPIRE.

Annual/Biennial Inspections [24 CFR 983.103(d); FR Notice 6/25/14] At least once every 24 months during the term of the HAP contract (or at least triennially for small rural PHAs), the PHA must inspect a random sample consisting of at least 20 percent of the contract units in each building to determine if the contract units and the premises are maintained in accordance with NSPIRE. Turnover inspections are not counted toward meeting this inspection requirement. The PHA also has the option in certain mixed finance properties to rely on alternative inspections conducted at least triennially.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Alternative Inspections [24 CFR 983.103(g); Notice PIH 2016-05] In the case of mixed-finance properties that are subject to alternative inspections, the PHA may rely upon an alternative inspection conducted at least triennially to demonstrate compliance with inspection requirements.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Other Inspections [24 CFR 983.103(e)]
The PHA must inspect contract units whenever needed to determine that the contract units comply with NSPIRE standards and that the owner is providing maintenance, utilities, and other services in accordance with the HAP contract. The PHA must take into account complaints and any other information coming to its attention in scheduling inspections.

The PHA must conduct follow-up inspections needed to determine if the owner (or, if applicable, the family) has corrected an NSPIRE deficiency and must conduct inspections to determine the basis for exercise of contractual and other remedies for owner or family NSPIRE deficiencies.

In conducting PHA supervisory quality control inspections, the PHA should include a representative sample of both tenant-based and project-based units.

Inspecting PHA-Owned Units [24 CFR 983.103(f)]
In the case of PHA-owned units, the inspections must be performed by an independent entity designated by the PHA and approved by HUD. The independent entity must furnish a copy of each inspection report to the PHA and to the HUD field office where the project is located. The PHA must take all necessary actions in response to inspection reports from the independent entity, including exercise of contractual remedies for violation of the HAP contract by the PHA-owner.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles .

Page17-24
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

PART IV: REHABILITATED AND NEWLY CONSTRUCTED UNITS
17-IV.A. OVERVIEW [24 CFR 983.151]
There are specific requirements that apply to PBV assistance for newly constructed or rehabilitated housing that do not apply to PBV assistance in existing housing. This part describes the requirements unique to this type of assistance.

Housing selected for this type of assistance may not at a later date be selected for PBV assistance as existing housing.
17-IV.B. AGREEMENT TO ENTER INTO HAP CONTRACT
In order to offer PBV assistance in rehabilitated or newly constructed units, the PHA must enter into an agreement to enter into HAP contract (Agreement) with the owner of the property. The Agreement must be in the form required by HUD [24 CFR 983.152(b)]. The PHA may not enter into an Agreement if commencement of construction or rehabilitation has commenced after proposal submission [24 CFR 983.152(c)]. Construction begins when excavation or site preparation (including clearing of the land) begins for the housing. Rehabilitation begins with the physical commencement of rehabilitation activity on the housing.

In the Agreement the owner agrees to develop the PBV contract units to comply with NSPIRE, and the PHA agrees that upon timely completion of such development in accordance with the terms of the Agreement, the PHA will enter into a HAP contract with the owner for the contract units [24 CFR 983.152(a)].

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Content of the Agreement [24 CFR 983.152(d)]
At a minimum, the Agreement must describe the following features of the housing to be developed and assisted under the PBV program:
• Site and the location of the contract units;
• Number of contract units by area (size) and number of bedrooms and bathrooms; • Services, maintenance, or equipment to be supplied by the owner without charges in addition to the rent;
• Utilities available to the contract units, including a specification of utility services to be paid by the owner and utility services to be paid by the tenant; • An indication of whether or not the design and construction requirements of the Fair Housing Act and section 504 of the Rehabilitation Act of 1973 apply to units under the Agreement. If applicable, any required work item resulting from these requirements must be included in the description of work to be performed under the Agreement; • Estimated initial rents to owner for the contract units; • Description of the work to be performed under the Agreement. For rehabilitated units, the description must include the rehabilitation work write up and, where determined necessary by the PHA, specifications and plans. For new construction units, the description must include the working drawings and specifications.
• Any additional requirements for quality, architecture, or design over and above NSPIRE standards.

Execution of the Agreement [24 CFR 983.153]
The Agreement must be executed promptly after PHA notice of proposal selection to the selected owner. The PHA may not enter into the Agreement if construction or rehabilitation has started after proposal submission. Generally, the PHA may not enter into the Agreement with the owner until the subsidy layering review is completed. Likewise, the PHA may not enter into the Agreement until the environmental review is completed and the PHA has received environmental approval. However, the PHA does not need to conduct a subsidy layering review in the case of a HAP contract for existing housing or if the applicable state or local agency has conducted such a review. Similarly, environmental reviews are not required for existing structures unless otherwise required by law or regulation.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-IV.C. CONDUCT OF DEVELOPMENT WORK
Labor Standards [24 CFR 983.154(b)]
If an Agreement covers the development of nine or more contract units (whether or not completed in stages), the owner and the owner’s contractors and subcontractors must pay DavisBacon wages to laborers and mechanics employed in the development of housing. Further, these Davis-Bacon requirements apply to existing PBV units when the nature of any work to be performed either before the execution of the HAP contract or within 18 months after execution constitutes project development. Any development initiated on existing units within 18 months after the effective date of the HAP contract on projects with nine or more contract units triggers Davis-Bacon requirements.

The HUD-prescribed form of the Agreement will include the labor standards clauses required by HUD, such as those involving Davis-Bacon wage rates. The addendum to the HAP contract, Form HUD-5679, also includes the required labor standards clauses.

The owner, contractors, and subcontractors must also comply with the Contract Work Hours and Safety Standards Act, Department of Labor regulations in 29 CFR part 5, and other applicable federal labor relations laws and regulations. The PHA must monitor compliance with labor standards.

Owner Disclosure [24 CFR 983.154(d) and (e)]
The Agreement and HAP contract must include a certification by the owner that the owner and other project principals are not on the U.S. General Services Administration list of parties excluded from federal procurement and non-procurement programs.

The owner must also disclose any possible conflict of interest that would be a violation of the Agreement, the HAP contract, or HUD regulations.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-IV.D. COMPLETION OF HOUSING
The Agreement must specify the deadlines for completion of the housing, and the owner must develop and complete the housing in accordance with these deadlines. The Agreement must also specify the deadline for submission by the owner of the required evidence of completion.

Evidence of Completion [24 CFR 983.155(b)]
At a minimum, the owner must submit the following evidence of completion to the PHA in the form and manner required by the PHA:
• Owner certification that the work has been completed in accordance with NSPIRE and all requirements of the Agreement; and
• Owner certification that the owner has complied with labor standards and equal opportunity requirements in development of the housing.

At the PHA’s discretion, the Agreement may specify additional documentation that must be submitted by the owner as evidence of housing completion.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

PHA Acceptance of Completed Units [24 CFR 983.156]
Upon notice from the owner that the housing is completed, the PHA must inspect to determine if the housing has been completed in accordance with the Agreement, including compliance with NSPIRE standards and any additional requirements imposed under the Agreement. The PHA must also determine if the owner has submitted all required evidence of completion.

If the work has not been completed in accordance with the Agreement, the PHA must not enter into the HAP contract.

If the PHA determines the work has been completed in accordance with the Agreement and that the owner has submitted all required evidence of completion, the PHA must submit the HAP contract for execution by the owner and must then execute the HAP contract.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

PART V: HOUSING ASSISTANCE PAYMENTS CONTRACT (HAP)
17-V.A. OVERVIEW
The PHA must enter into a HAP contract with an owner for units that are receiving PBV assistance. The purpose of the HAP contract is to provide housing assistance payments for eligible families. Housing assistance is paid for contract units leased and occupied by eligible families during the HAP contract term. With the exception of single-family scattered-site projects, a HAP contract shall cover a single project. If multiple projects exist, each project is covered by a separate HAP contract. The HAP contract must be in the form required by HUD [24 CFR 983.202(a)].
17-V.B. HAP CONTRACT REQUIREMENTS
Contract Information [24 CFR 983.203]
The HAP contract must specify the following information:
• The total number of contract units by number of bedrooms; • The project’s name, street address, city or county, state and zip code, block and lot number (if known), and any other information necessary to clearly identify the site and the building; • The number of contract units in each building, the location of each contract unit, the area of each contract unit, and the number of bedrooms and bathrooms in each contract unit; • Services, maintenance, and equipment to be supplied by the owner and included in the rent to owner;
• Utilities available to the contract units, including a specification of utility services to be paid by the owner (included in rent) and utility services to be paid by the tenant; • Features provided to comply with program accessibility requirements of Section 504 of the Rehabilitation Act of 1973 and implementing regulations at 24 CFR part 8; • The HAP contract term;
• The number of units in any project that will exceed the 25 percent per project cap, which will be set aside for occupancy by qualifying families (elderly and/or disabled families and families receiving supportive services); and
• The initial rent to owner for the first 12 months of the HAP contract term.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Execution of the HAP Contract [24 CFR 983.204]
The PHA may not enter into a HAP contract until each contract unit has been inspected and the PHA has determined that the unit complies with the NSPIRE standards, unless the PHA has adopted a policy to enter into a HAP contract for units that fail the initial inspection where no life-threatening conditions are present. For existing housing, the HAP contract must be executed promptly after the PHA selects the owner proposal and inspects the housing units. For newly constructed or rehabilitated housing the HAP contract must be executed after the PHA has inspected the completed units and has determined that the units have been completed in accordance with the agreement to enter into HAP, and the owner furnishes all required evidence of completion.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Term of HAP Contract [24 CFR 983.205, FR Notice 1/18/17, and Notice PIH 2017-21] The PHA may enter into a HAP contract with an owner for an initial term of no less than one year and no more than 20 years for each contract unit. The length of the term of the HAP contract for any contract unit may not be less than one year, nor more than 20 years. In the case of PHA-owned units, the term of the HAP contract must be agreed upon by the PHA and the independent entity approved by HUD [24 CFR 983.59(b)(2)].

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

PHA Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Termination by PHA [24 CFR 983.205(c) and FR Notice 1/18/17] The HAP contract must provide that the term of the PHA’s contractual commitment is subject to the availability of sufficient appropriated funding as determined by HUD or by the PHA in accordance with HUD instructions. For these purposes, sufficient funding means the availability of appropriations, and of funding under the ACC from such appropriations, to make full payment of housing assistance payments payable to the owner for any contract year in accordance with the terms of the HAP contract.

In times of insufficient funding, HUD requires that PHAs first take all cost-saving measures prior to failing to make payments under existing PBV HAP contracts.

If it is determined that there may not be sufficient funding to continue housing assistance payments for all contract units and for the full term of the HAP contract, the PHA may terminate the HAP contract by notice to the owner. The termination must be implemented in accordance with HUD instructions.

Termination by Owner [24 CFR 983.205(d)]
If in accordance with program requirements the amount of rent to an owner for any contract unit is reduced below the amount of the rent to owner at the beginning of the HAP contract term, the owner may terminate the HAP contract by giving notice to the PHA. In this case, families living in the contract units must be offered tenant-based assistance.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Statutory Notice Requirements: Contract Termination or Expiration [24 CFR 983.206, FR Notice 1/18/17, and Notice PIH 2017-21]
Not less than one year before the HAP contract terminates, or if the owner refuses to renew the HAP contract, the owner must notify the PHA and assisted tenants of the termination. The notice must be provided in the form prescribed by HUD. If the owner does not give timely notice, the owner must permit the tenants in assisted units to remain in their units for the required notice period with no increase in the tenant portion of their rent, and with no eviction as a result of the owner's inability to collect an increased tenant portion of rent. An owner may renew the terminating contract for a period of time sufficient to give tenants one-year advance notice under such terms as HUD may require.

Upon termination or expiration of the contract, a family living at the property is entitled to receive a tenant-based voucher. Tenant-based assistance would not begin until the owner’s required notice period ends. The PHA must provide the family with a voucher and the family must also be given the option by the PHA and owner to remain in their unit with HCV tenantbased assistance as long as the unit complies with inspection and rent reasonableness requirements. The family must pay their total tenant payment (TTP) and any additional amount if the gross rent exceeds the applicable payment standard. The family has the right to remain in the project as long as the units are used for rental housing and are otherwise eligible for HCV assistance. The owner may not terminate the tenancy of a family that exercises its right to remain except for serious or repeated lease violations or other good cause. Families that receive a tenantbased voucher at the expiration or termination of the PBV HAP contract are not new admissions to the PHA HCV tenant-based program and are not subject to income eligibility requirements or any other admission requirements. If the family chooses to remain in their unit with tenant-based assistance, the family may do so regardless of whether the family share would initially exceed 40 percent of the family’s adjusted monthly income.

Remedies for NSPIRE Deficiencies [24 CFR 983.208(b)]
The PHA may not make any HAP payment to the owner for a contract unit during any period in which the unit does not comply with NSPIRE standards. If the PHA determines that a contract does not comply with NSPIRE standards, the PHA may exercise any of its remedies under the HAP contract, for any or all of the contract units. Available remedies include termination of housing assistance payments, abatement or reduction of housing assistance payments, reduction of contract units, and termination of the HAP contract.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-V.C. AMENDMENTS TO THE HAP CONTRACT
Substitution of Contract Units [24 CFR 983.207(a)]
At the PHA’s discretion and subject to all PBV requirements, the HAP contract may be amended to substitute a different unit with the same number of bedrooms in the same project for a previously covered contract unit. Before any such substitution can take place, the PHA must inspect the proposed unit and determine the reasonable rent for the unit.

Addition of Contract Units [FR Notice 1/18/17 and Notice PIH 2017-21] The PHA and owner may amend the HAP contract to add additional PBV contract units in projects that already have a HAP contract without having to fulfill the selection requirements found at 24 CFR 983.51(b) for those additional PBV units, regardless of when the HAP contract was signed. The additional PBV units, however, are still subject to the PBV program cap and individual project caps. Prior to attaching additional units without competition, the PHA must submit to the local field office information outlined in FR Notice 1/18/17. The PHA must also detail in the administrative plan their intent to add PBV units and the rationale for adding units to the specific PBV project.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.
17-V.D. HAP CONTRACT YEAR, ANNIVERSARY AND EXPIRATION DATES [24 CFR 983.207(b) and 983.302(e)]
The HAP contract year is the period of 12 calendar months preceding each annual anniversary of the HAP contract during the HAP contract term. The initial contract year is calculated from the first day of the first calendar month of the HAP contract term.

The annual anniversary of the HAP contract is the first day of the first calendar month after the end of the preceding contract year.

There is a single annual anniversary and expiration date for all units under a particular HAP contract, even in cases where contract units are placed under the HAP contract in stages (on different dates) or units are added by amendment. The anniversary and expiration dates for all units coincide with the dates for the contract units that were originally placed under contract.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-V.E. OWNER RESPONSIBILITIES UNDER THE HAP CONTRACT
[24 CFR 983.210]
When the owner executes the HAP contract s/he certifies that at such execution and at all times during the term of the HAP contract:
• All contract units are in good condition and the owner is maintaining the premises and contract units in accordance with NSPIRE standards;
• The owner is providing all services, maintenance, equipment and utilities as agreed to under the HAP contract and the leases;
• Each contract unit for which the owner is receiving HAP, is leased to an eligible family referred by the PHA, and the lease is in accordance with the HAP contract and HUD requirements;
• To the best of the owner’s knowledge the family resides in the contract unit for which the owner is receiving HAP, and the unit is the family’s only residence; • The owner (including a principal or other interested party) is not the spouse, parent, child, grandparent, grandchild, sister, or brother of any member of a family residing in a contract unit;
• The amount of the HAP the owner is receiving is correct under the HAP contract; • The rent for contract units does not exceed rents charged by the owner for comparable unassisted units;
• Except for HAP and tenant rent, the owner has not received and will not receive any other payment or consideration for rental of the contract unit; • The family does not own or have any interest in the contract unit (does not apply to family's membership in a cooperative); and
• Repair work on the project selected as an existing project that is performed after HAP execution within such post-execution period as specified by HUD may constitute development activity, and if determined to be development activity, the repair work undertaken shall be in compliance with Davis-Bacon wage requirements.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-V.F. ADDITIONAL HAP REQUIREMENTS
Housing Quality and Design Requirements [24 CFR 983.101(e) and 983.208(a)] The owner is required to maintain and operate the contract units and premises in accordance with NSPIRE standards, including performance of ordinary and extraordinary maintenance. The owner must provide all the services, maintenance, equipment, and utilities specified in the HAP contract with the PHA and in the lease with each assisted family. In addition, maintenance, replacement and redecoration must be in accordance with the standard practice for the building as established by the owner.

The PHA may elect to establish additional requirements for quality, architecture, or design of PBV housing. Any such additional requirements must be specified in the Agreement to enter into a HAP contract and the HAP contract. These requirements must be in addition to, not in place of, compliance with NSPIRE standards.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Vacancy Payments [24 CFR 983.352(b)]
At the discretion of the PHA, the HAP contract may provide for vacancy payments to the owner for a PHA-determined period of vacancy extending from the beginning of the first calendar month after the move-out month for a period not exceeding two full months following the moveout month. The amount of the vacancy payment will be determined by the PHA and cannot exceed the monthly rent to owner under the assisted lease, minus any portion of the rental payment received by the owner (including amounts available from the tenant’s security deposit).

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles .

Page17-36
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

PART VI: SELECTION OF PBV PROGRAM PARTICIPANTS
17-VI.A. OVERVIEW
Many of the provisions of the tenant-based voucher regulations [24 CFR 982] also apply to the PBV program. This includes requirements related to determining eligibility and selecting applicants from the waiting list. Even with these similarities, there are requirements that are unique to the PBV program. This part describes the requirements and policies related to eligibility and admission to the PBV program.
17-VI.B. ELIGIBILITY FOR PBV ASSISTANCE [24 CFR 983.251(a) and (b)] The PHA may select families for the PBV program from those who are participants in the PHA’s tenant-based voucher program and from those who have applied for admission to the voucher program. For voucher participants, eligibility was determined at original admission to the voucher program and does not need to be redetermined at the commencement of PBV assistance.

For all others, eligibility for admission must be determined at the commencement of PBV assistance.

Applicants for PBV assistance must meet the same eligibility requirements as applicants for the tenant-based voucher program. Applicants must qualify as a family as defined by HUD and the PHA, meet asset limitation requirements, have income at or below HUD-specified income limits, and qualify on the basis of citizenship or the eligible immigration status of family members [24 CFR 982.201(a) and 24 CFR 983.2(a)]. In addition, an applicant family must provide social security information for family members [24 CFR 5.216 and 5.218] and consent to the PHA’s collection and use of family information regarding income, expenses, and family composition [24 CFR 5.230]. The PHA may also not approve a tenancy if the owner (including a principal or other interested party) of the unit is the parent, child, grandparent, grandchild, sister, or brother of any member of the family, unless needed as a reasonable accommodation. An applicant family must also meet HUD requirements related to current or past criminal activity.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

In-Place Families [24 CFR 983.251(b)]
An eligible family residing in a proposed PBV contract unit on the date the proposal is selected by the PHA is considered an “in-place family.” These families are afforded protection from displacement under the PBV rule. If a unit to be placed under contract (either an existing unit or a unit requiring rehabilitation) is occupied by an eligible family on the date the proposal is selected, the in-place family must be placed on the PHA’s waiting list. Once the family’s continued eligibility is determined (the PHA may deny assistance to an in-place family for the grounds specified in 24 CFR 982.552 and 982.553), the family must be given an absolute selection preference and the PHA must refer these families to the project owner for an appropriately sized PBV unit in the project. Admission of eligible in-place families is not subject to income targeting requirements.

This regulatory protection from displacement does not apply to families that are not eligible to participate in the program on the proposal selection date.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-VI.C. ORGANIZATION OF THE WAITING LIST [24 CFR 983.251(c)] The PHA may establish a separate waiting list for PBV units or it may use the same waiting list for both tenant-based and project-based assistance. The PHA may also merge the PBV waiting list with a waiting list for other assisted housing programs offered by the PHA. If the PHA chooses to offer a separate waiting list for PBV assistance, the PHA must offer to place applicants who are listed on the tenant-based waiting list on the waiting list for PBV assistance.

If a PHA decides to establish a separate PBV waiting list, the PHA may use a single waiting list for the PHA’s whole PBV program, or it may establish separate waiting lists for PBV units in particular projects or buildings or for sets of such units.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

17-VI.D. SELECTION FROM THE WAITING LIST [24 CFR 983.251(c)] Applicants who will occupy units with PBV assistance must be selected from the PHA’s waiting list. The PHA may establish selection criteria or preferences for occupancy of particular PBV units. The PHA may place families referred by the PBV owner on its PBV waiting list.

Income Targeting [24 CFR 983.251(c)(6)]
At least 75 percent of the families admitted to the PHA’s tenant-based and project-based voucher programs during the PHA fiscal year from the waiting list must be extremely low-income families. The income targeting requirement applies to the total of admissions to both programs.

Units with Accessibility Features [24 CFR 983.251(c)(7)] When selecting families to occupy PBV units that have special accessibility features for persons with disabilities, the PHA must first refer families who require such features to the owner.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Preferences [24 CFR 983.251(d), FR Notice 11/24/08]
The PHA may use the same selection preferences that are used for the tenant-based voucher program, establish selection criteria or preferences for the PBV program as a whole, or for occupancy of particular PBV developments or units. The PHA must provide an absolute selection preference for eligible in-place families as described in Section 17-VI.B. above.

The PHA may establish a selection preference for families who qualify for voluntary services, including disability-specific services, offered in conjunction with assisted units, provided that preference is consistent with the PHA plan. The PHA may not, however, grant a preference to a person with a specific disability [FR Notice 1/18/17].

In advertising such a project, the owner may advertise the project as offering services for a particular type of disability; however, the project must be open to all otherwise eligible disabled persons who may benefit from services provided in the project. In these projects, disabled residents may not be required to accept the particular services offered as a condition of occupancy.

If the PHA has projects with “excepted units” for elderly families or supportive services, the PHA must give preference to such families when referring families to these units [24 CFR 983.261(b); FR Notice 1/18/17].

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-VI.E. OFFER OF PBV ASSISTANCE
Refusal of Offer [24 CFR 983.251(e)(3)]
The PHA is prohibited from taking any of the following actions against a family who has applied for, received, or refused an offer of PBV assistance:
• Refuse to list the applicant on the waiting list for tenant-based voucher assistance; • Deny any admission preference for which the applicant qualifies; • Change the applicant’s place on the waiting list based on preference, date, and time of application, or other factors affecting selection under the PHA’s selection policy; • Remove the applicant from the tenant-based voucher waiting list.

Disapproval by Landlord [24 CFR 983.251(e)(2)]
If a PBV owner rejects a family for admission to the owner’s units, such rejection may not affect the family’s position on the tenant-based voucher waiting list.

Acceptance of Offer [24 CFR 983.252]
Family Briefing
When a family accepts an offer for PBV assistance, the PHA must give the family an oral briefing. The briefing must include information on how the program works and the responsibilities of the family and owner. In addition to the oral briefing, the PHA must provide a briefing packet that explains how the PHA determines the total tenant payment for a family, the family obligations under the program, and applicable fair housing information.

Persons with Disabilities
If an applicant family’s head or spouse is disabled, the PHA must assure effective communication, in accordance with 24 CFR 8.6, in conducting the oral briefing and in providing the written information packet. This may include making alternative formats available (see Chapter 2). In addition, the PHA must have a mechanism for referring a family that includes a member with a mobility impairment to an appropriate accessible PBV unit.

Persons with Limited English Proficiency
The PHA should take reasonable steps to assure meaningful access by persons with limited English proficiency in accordance with Title VI of the Civil Rights Act of 1964 and Executive Order 13166 (see Chapter 2).

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-VI.F. OWNER SELECTION OF TENANTS
The owner is responsible for developing written tenant selection procedures that are consistent with the purpose of improving housing opportunities for very low-income families and reasonably related to program eligibility and an applicant’s ability to fulfill their obligations under the lease. An owner must promptly notify in writing any rejected applicant of the grounds for any rejection [24 CFR 983.253(a)(2) and (a)(3)].

Leasing [24 CFR 983.253(a)]
During the term of the HAP contract, the owner must lease contract units to eligible families that are selected and referred by the PHA from the PHA’s waiting list. The contract unit leased to the family must be the appropriate size unit for the size of the family, based on the PHA’s subsidy standards.

Filling Vacancies [24 CFR 983.254(a)]
The owner must promptly notify the PHA of any vacancy or expected vacancy in a contract unit.

After receiving such notice, the PHA must make every reasonable effort to promptly refer a sufficient number of families for the owner to fill such vacancies. The PHA and the owner must make reasonable efforts to minimize the likelihood and length of any vacancy.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Reduction in HAP Contract Units Due to Vacancies [24 CFR 983.254(b)] If any contract units have been vacant for 120 or more days since owner notice of the vacancy, the PHA may give notice to the owner amending the HAP contract to reduce the number of contract units by subtracting the number of contract units (according to the bedroom size) that have been vacant for this period.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-VI.G. TENANT SCREENING [24 CFR 983.255]
PHA Responsibility
The PHA is not responsible or liable to the owner or any other person for the family’s behavior or suitability for tenancy. However, the PHA may opt to screen applicants for family behavior or suitability for tenancy and may deny applicants based on such screening.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

The PHA must provide the owner with an applicant family’s current and prior address (as shown in PHA records) and the name and address (if known by the PHA) of the family’s current landlord and any prior landlords.

In addition, the PHA may offer the owner other information the PHA may have about a family, including information about the tenancy history of family members or about drug trafficking and criminal activity by family members. The PHA must provide applicant families a description of the PHA policy on providing information to owners, and the PHA must give the same types of information to all owners.

The PHA may not disclose to the owner any confidential information provided in response to a request for documentation of domestic violence, dating violence, sexual assault, stalking, or human trafficking, except at the written request or with the written consent of the individual providing the documentation [see 24 CFR 5.2007(a)(4)].

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Owner Responsibility
The owner is responsible for screening and selection of the family to occupy the owner’s unit.

When screening families the owner may consider a family’s background with respect to the following factors:
• Payment of rent and utility bills;
• Caring for a unit and premises;
• Respecting the rights of other residents to the peaceful enjoyment of their housing; • Drug-related criminal activity or other criminal activity that is a threat to the health, safety, or property of others; and
• Compliance with other essential conditions of tenancy.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles .

Page17-44
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

PART VII: OCCUPANCY
17-VII.A. OVERVIEW
After an applicant has been selected from the waiting list, determined eligible by the PHA, referred to an owner and determined suitable by the owner, the family will sign the lease and occupancy of the unit will begin.
17-VII.B. LEASE [24 CFR 983.256]
The tenant must have legal capacity to enter a lease under state and local law. Legal capacity means that the tenant is bound by the terms of the lease and may enforce the terms of the lease against the owner.

Form of Lease [24 CFR 983.256(b)]
The tenant and the owner must enter into a written lease agreement that is signed by both parties.

If an owner uses a standard lease form for rental units to unassisted tenants in the locality or premises, the same lease must be used for assisted tenants, except that the lease must include a HUD-required tenancy addendum. The tenancy addendum must include, word-for-word, all provisions required by HUD.

If the owner does not use a standard lease form for rental to unassisted tenants, the owner may use another form of lease, such as a PHA model lease.

The PHA may review the owner’s lease form to determine if the lease complies with state and local law. If the PHA determines that the lease does not comply with state or local law, the PHA may decline to approve the tenancy.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Lease Requirements [24 CFR 983.256(c)]
The lease for a PBV unit must specify all of the following information:
• The names of the owner and the tenant;
• The unit rented (address, apartment number, if any, and any other information needed to identify the leased contract unit);
• The term of the lease (initial term and any provision for renewal); • The amount of the tenant rent to owner, which is subject to change during the term of the lease in accordance with HUD requirements;
• A specification of the services, maintenance, equipment, and utilities that will be provide by the owner; and
• The amount of any charges for food, furniture, or supportive services.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Tenancy Addendum [24 CFR 983.256(d)]
The tenancy addendum in the lease must state:
• The program tenancy requirements;
• The composition of the household as approved by the PHA (the names of family members and any PHA-approved live-in aide);
• All provisions in the HUD-required tenancy addendum must be included in the lease. The terms of the tenancy addendum prevail over other provisions of the lease.

Initial Term and Lease Renewal [24 CFR 983.256(f)]
The initial lease term must be for at least one year. The lease must provide for automatic renewal after the initial term of the lease in either successive definitive terms (e.g. month-to-month or year-to-year) or an automatic indefinite extension of the lease term. For automatic indefinite extension of the lease term, the lease terminates if any of the following occur:
• The owner terminates the lease for good cause
• The tenant terminates the lease
• The owner and tenant agree to terminate the lease
• The PHA terminates the HAP contract
• The PHA terminates assistance for the family
Changes in the Lease [24 CFR 983.256(e)]
If the tenant and owner agree to any change in the lease, the change must be in writing, and the owner must immediately give the PHA a copy of all changes.

The owner must notify the PHA in advance of any proposed change in the lease regarding the allocation of tenant and owner responsibilities for utilities. Such changes may only be made if approved by the PHA and in accordance with the terms of the lease relating to its amendment.

The PHA must redetermine reasonable rent, in accordance with program requirements, based on any change in the allocation of the responsibility for utilities between the owner and the tenant.

The redetermined reasonable rent will be used in calculation of the rent to owner from the effective date of the change.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Owner Termination of Tenancy [24 CFR 983.257]
With two exceptions, the owner of a PBV unit may terminate tenancy for the same reasons an owner may in the tenant-based voucher program (see Section 12-III.B. and 24 CFR 982.310). In the PBV program, terminating tenancy for “good cause” does not include doing so for a business or economic reason, or a desire to use the unit for personal or family use or other non-residential purpose.

Tenant Absence from the Unit [24 CFR 983.256(g) and 982.312(a)] The lease may specify a maximum period of family absence from the unit that may be shorter than the maximum period permitted by PHA policy. According to program requirements, the family’s assistance must be terminated if they are absent from the unit for more than 180 consecutive days. PHA termination of assistance actions due to family absence from the unit are subject to 24 CFR 981.312, except that the unit is not terminated from the HAP contract if the family is absent for longer than the maximum period permitted.

Continuation of Housing Assistance Payments [24 CFR 982.258] Housing assistance payments shall continue until the tenant rent equals the rent to owner. The cessation of housing assistance payments at such point will not affect the family's other rights under its lease, nor will such cessation preclude the resumption of payments as a result of later changes in income, rents, or other relevant circumstances if such changes occur within 180 days following the date of the last housing assistance payment by the PHA. After the 180-day period, the unit shall be removed from the HAP contract pursuant to 24 CFR 983.211.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Security Deposits [24 CFR 983.259]
The owner may collect a security deposit from the tenant. The PHA may prohibit security deposits in excess of private market practice, or in excess of amounts charged by the owner to unassisted tenants.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-VII.C. MOVES
Overcrowded, Under-Occupied, and Accessible Units [24 CFR 983.260] If the PHA determines that a family is occupying a wrong size unit, based on the PHA’s subsidy standards, or a unit with accessibility features that the family does not require, and the unit is needed by a family that does require the features, the PHA must promptly notify the family and the owner of this determination, and the PHA must offer the family the opportunity to receive continued housing assistance in another unit.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

If the PHA offers the family a tenant-based voucher, the PHA must terminate the housing assistance payments for a wrong-sized or accessible unit at the earlier of the expiration of the term of the family’s voucher (including any extension granted by the PHA) or the date upon which the family vacates the unit. If the family does not move out of the wrong-sized unit or accessible unit by the expiration of the term of the family's voucher, the PHA must remove the unit from the HAP contract.

If the PHA offers the family another form of assistance that is not a tenant-based voucher, and the family does not accept the offer, does not move out of the PBV unit within a reasonable time as determined by the PHA, or both, the PHA must terminate the housing assistance payments for the unit at the expiration of a reasonable period as determined by the PHA and remove the unit from the HAP contract.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Family Right to Move [24 CFR 983.261]
The family may terminate the lease at any time after the first year of occupancy. The family must give advance written notice to the owner in accordance with the lease and provide a copy of such notice to the PHA. If the family wishes to move with continued tenant-based assistance, the family must contact the PHA to request the rental assistance prior to providing notice to terminate the lease.

If the family terminates the lease in accordance with these requirements, the PHA is required to offer the family the opportunity for continued tenant-based assistance, in the form of a voucher or other comparable tenant-based rental assistance. If voucher or other comparable tenant-based assistance is not immediately available upon termination of the family’s lease in the PBV unit, the PHA must give the family priority to receive the next available opportunity for continued tenant-based assistance.

If the family terminates the assisted lease before the end of the first year, the family relinquishes the opportunity for continued tenant-based assistance.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Emergency Transfers under VAWA [Notice PIH 2017-08]
Except where special consideration is needed for the project-based voucher program, the PHA will follow VAWA policies as outlined in Chapter 16 Part IX of this administrative plan, including using the Emergency Transfer Plan as the basis for PBV transfers under VAWA (Exhibit 16-4).

HUD requires that the PHA include policies that address when a victim has been living in a unit for less than a year or when a victim seeks to move sooner than a tenant-based voucher is available.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-VII.D. EXCEPTIONS TO THE OCCUPANCY CAP [24 CFR 983.262] As of April 17, 2018, the PHA may not pay housing assistance under a PBV HAP contract for more than the greater of 25 units or 25 percent of the number of dwelling units in a project unless:
• The units are exclusively for elderly families
• The units are for households eligible for supportive services available to all families receiving PBV assistance in the project
If the project is located in a census tract with a poverty rate of 20 percent or less, as determined in the most recent American Community Survey Five-Year estimates, the project cap is the greater of 25 units or 40 percent (instead of 25 percent) of the units in the project [FR Notice 7/14/17].

If a family at the time of initial tenancy is receiving and while the resident of an excepted unit has received Family Self-Sufficiency (FSS) supportive services or any other service as defined by the PHA and successfully completes the FSS contract of participation or the supportive services requirement, the unit continues to count as an excepted unit for as long as the family resides in the unit. However, if the FSS family fails to successfully complete the FSS contract of participation or supportive services objective and consequently is no longer eligible for the supportive services, the family must vacate the unit within a reasonable period of time established by the PHA, and the PHA shall cease paying HAP on behalf of the family.

Further, when a family (or remaining members of a family) residing in an excepted unit no longer meets the criteria for a “qualifying family” because the family is no longer an elderly family due to a change in family composition, the PHA has the discretion to allow the family to remain in the excepted unit. If the PHA does not exercise this discretion, the family must vacate the unit within a reasonable period of time established by the PHA, and the PHA must cease paying housing assistance payments on behalf of the non-qualifying family.

Individuals in units with supportive services who choose to no longer participate in a service or who no longer qualify for services they qualified for at the time of initial occupancy cannot subsequently be denied continued housing opportunity because of this changed circumstance. A PHA or owner cannot determine that a participant’s needs exceed the level of care offered by qualifying services or require that individuals be transitioned to different projects based on service needs.

If the family fails to vacate the unit within the established time, the unit must be removed from the HAP contract unless the project is partially assisted, and it is possible for the HAP contract to be amended to substitute a different unit in the building in accordance with program requirements; or the owner terminates the lease and evicts the family. The housing assistance payments for a family residing in an excepted unit that is not in compliance with its family obligations to comply with supportive services requirements must be terminated by the PHA.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

The PHA may allow a family that initially qualified for occupancy of an excepted unit based on elderly family status to continue to reside in a unit, where through circumstances beyond the control of the family (e.g., death of the elderly family member or long-term or permanent hospitalization or nursing care), the elderly family member no longer resides in the unit. In this case, the unit may continue to be counted as an excepted unit for as long as the family resides in that unit. Once the family vacates the unit, in order to continue as an excepted unit under the HAP contract, the unit must be made available to and occupied by a qualified family.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles .

Page17-54
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

PART VIII: DETERMINING RENT TO OWNER
17-VIII.A. OVERVIEW
The amount of the initial rent to an owner of units receiving PBV assistance is established at the beginning of the HAP contract term. Although for rehabilitated or newly constructed housing, the agreement to enter into HAP Contract (Agreement) states the estimated amount of the initial rent to owner, the actual amount of the initial rent to owner is established at the beginning of the HAP contract term.

During the tem of the HAP contract, the rent to owner is redetermined at the owner’s request in accordance with program requirements, and at such time that there is a ten percent or greater decrease in the published FMR.
17-VIII.B. RENT LIMITS [24 CFR 983.301]
Except for certain tax credit units (discussed below), the rent to owner must not exceed the lowest of the following amounts:
• An amount determined by the PHA, not to exceed 110 percent of the applicable fair market rent (or any HUD-approved exception payment standard) for the unit bedroom size minus any utility allowance;
• The reasonable rent; or
• The rent requested by the owner.

Certain Tax Credit Units [24 CFR 983.301(c)]
For certain tax credit units, the rent limits are determined differently than for other PBV units.

Different limits apply to contract units that meet all of the following criteria:
• The contract unit receives a low-income housing tax credit under the Internal Revenue Code of 1986;
• The contract unit is not located in a qualified census tract; • There are comparable tax credit units of the same bedroom size as the contract unit in the same project, and the comparable tax credit units do not have any form of rental assistance other than the tax credit; and
• The tax credit rent exceeds 110 percent of the fair market rent or any approved exception payment standard;
For contract units that meet all of these criteria, the rent to owner must not exceed the lowest of:
• The tax credit rent minus any utility allowance;
• The reasonable rent; or
• The rent requested by the owner.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Definitions
A qualified census tract is any census tract (or equivalent geographic area defined by the Bureau of the Census) in which at least 50 percent of households have an income of less than 60 percent of Area Median Gross Income (AMGI), or where the poverty rate is at least 25 percent and where the census tract is designated as a qualified census tract by HUD.

Tax credit rent is the rent charged for comparable units of the same bedroom size in the project that also receive the low-income housing tax credit but do not have any additional rental assistance (e.g., tenant-based voucher assistance).

Reasonable Rent [24 CFR 983.301(e) and 983.302(c)(2)]
The PHA must determine reasonable rent in accordable with 24 CFR 983.303. The rent to owner for each contract unit may at no time exceed the reasonable rent, except in cases where the PHA has elected within the HAP contract not to reduce rents below the initial rent to owner and, upon redetermination of the rent to owner, the reasonable rent would result in a rent below the initial rent. However, the rent to owner must be reduced in the following cases:
• To correct errors in calculations in accordable with HUD requirements • If additional housing assistance has been combined with PBV assistance after the execution of the initial HAP contract and a rent decrease is required pursuant to 24 CFR 983.55 • If a decrease in rent to owner is required based on changes in the allocation of the responsibility for utilities between owner and tenant
If the PHA has not elected within the HAP contract to establish the initial rent to owner as the rent floor, the rent to owner shall not at any time exceed the reasonable rent.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Use of FMRs, Exception Payment Standards, and Utility Allowances [24 CFR 983.301(f)] When determining the initial rent to owner, the PHA must use the most recently published FMR in effect and the utility allowance schedule in effect at execution of the HAP contract. When redetermining the rent to owner, the PHA must use the most recently published FMR and the utility allowance schedule in effect at the time of redetermination. At its discretion, the PHA may for initial rent, use the amounts in effect at any time during the 30-day period immediately before the beginning date of the HAP contract, or for redeterminations of rent, the 30-day period immediately before the redetermination date.

Any HUD-approved exception payment standard amount under the tenant-based voucher program also applies to the project-based voucher program. HUD will not approve a different exception payment stand amount for use in the PBV program.

Likewise, the PHA may not establish or apply different utility allowance amounts for the PBV program. The same utility allowance schedule applies to both the tenant-based and project-based voucher programs.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Use of Small Area FMRs (SAFMRs) [24 CFR 888.113(h)]
While small area FMRs (SAFMRs) do not apply to PBV projects, PHAs that operate a tenantbased program under SAFMRs may apply SAFMRs to all future PBV HAP contracts. If the PHA adopts this policy, it must apply to all future PBV projects and the PHA’s entire jurisdiction. The PHA and owner may not subsequently choose to revert back to use of the FMRs once the SAFMRs have been adopted, even if the PHA subsequently changes its policy.

Further, the PHA may apply SAFMRs to current PBV projects where the notice of owner selection was made on or before the effective date of PHA implementation, provided the owner is willing to mutually agree to doing so and the application is prospective. The PHA and owner may not subsequently choose to revert back to use of the FMRs once the SAFMRs have been adopted, even if the PHA subsequently changes its policy. If rents increase as a result of the use of SAFMRs, the rent increase may not be effective until the first anniversary of the HAP contract.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Redetermination of Rent [24 CFR 983.302]
The PHA must redetermine the rent to owner upon the owner’s request or when there is a 10 percent or greater decrease in the published FMR.

Rent Increase
If an owner wishes to request an increase in the rent to owner from the PHA, it must be requested at the annual anniversary of the HAP contract (see Section 17-V.D.). The request must be in writing and in the form and manner required by the PHA. The PHA may only make rent increases in accordance with the rent limits described previously. There are no provisions in the PBV program for special adjustments (e.g., adjustments that reflect increases in the actual and necessary expenses of owning and maintaining the units which have resulted from substantial general increases in real property taxes, utility rates, or similar costs).

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

The PHA may not approve, and the owner may not receive any increase of rent to owner, until and unless the owner has complied with requirements of the HAP contract, including compliance with NSPIRE. The owner may not receive any retroactive increase of rent for any period of noncompliance.

Rent Decrease
If there is a decrease in the rent to owner, as established in accordance with program requirements such as a change in the FMR or exception payment standard, or reasonable rent amount, the rent to owner must be decreased regardless of whether the owner requested a rent adjustment, except where the PHA has elected within the HAP contract to not reduce rents below the initial rent under the initial HAP contract.

Notice of Rent Change
The rent to owner is redetermined by written notice by the PHA to the owner specifying the amount of the redetermined rent. The PHA notice of rent adjustment constitutes an amendment of the rent to owner specified in the HAP contract. The adjusted amount of rent to owner applies for the period of 12 calendar months from the annual anniversary of the HAP contract.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

PHA-Owned Units [24 CFR 983.301(g)]
For PHA-owned PBV units, the initial rent to owner and the annual redetermination of rent at the anniversary of the HAP contract are determined by the independent entity approved by HUD.

The PHA must use the rent to owner established by the independent entity.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-VIII.C. REASONABLE RENT [24 CFR 983.303]
At the time the initial rent is established and all times during the term of the HAP contract, the rent to owner for a contract unit may not exceed the reasonable rent for the unit as determined by the PHA, except where the PHA has elected within the HAP contract to not reduce rents below the initial rent under the initial HAP contract.

When Rent Reasonable Determinations Are Required
The PHA must redetermine the reasonable rent for a unit receiving PBV assistance whenever any of the following occur:
• There is a 10 percent or greater decrease in the published FMR in effect 60 days before the contract anniversary (for the unit sizes specified in the HAP contract) as compared with the FMR that was in effect one year before the contract anniversary date; • The PHA approves a change in the allocation of responsibility for utilities between the owner and the tenant;
• The HAP contract is amended to substitute a different contract unit in the same building or project; or
• There is any other change that may substantially affect the reasonable rent.

How to Determine Reasonable Rent
The reasonable rent of a unit receiving PBV assistance must be determined by comparison to rent for other comparable unassisted units. When making this determination, the PHA must consider factors that affect market rent. Such factors include the location, quality, size, type and age of the unit, as well as the amenities, housing services maintenance, and utilities to be provided by the owner.

Comparability Analysis
For each unit, the comparability analysis must use at least three comparable units in the private unassisted market. This may include units in the premises or project that is receiving projectbased assistance. The analysis must show how the reasonable rent was determined, including major differences between the contract units and comparable unassisted units, and must be retained by the PHA. The comparability analysis may be performed by PHA staff or by another qualified person or entity. Those who conduct these analyses or are involved in determining the housing assistance payment based on the analyses may not have any direct or indirect interest in the property.

PHA-Owned Units
For PHA-owned units, the amount of the reasonable rent must be determined by an independent agency approved by HUD in accordance with PBV program requirements. The independent entity must provide a copy of the determination of reasonable rent for PHA-owned units to the PHA and to the HUD field office where the project is located.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Owner Certification of Reasonable Rent
By accepting each monthly housing assistance payment, the owner certifies that the rent to owner is not more than rent charged by the owner for other comparable unassisted units in the premises. At any time, the PHA may require the owner to submit information on rents charged by the owner for other units in the premises or elsewhere. 17-VIII.D. EFFECT OF OTHER SUBSIDY AND RENT CONTROL
In addition to the rent limits discussed in Section 17-VIII.B above, other restrictions may limit the amount of rent to owner in a PBV unit. In addition, certain types of subsidized housing are not even eligible to receive PBV assistance (see Section 17-II.D).

Other Subsidy [24 CFR 983.304]
To comply with HUD subsidy layering requirements, at the discretion of HUD or its designee, a PHA shall reduce the rent to owner because of other governmental subsidies, including tax credits or tax exemptions, grants, or other subsidized funding.

For units receiving assistance under the HOME program, rents may not exceed rent limits as required by that program.

For units in any of the following types of federally subsidized projects, the rent to owner may not exceed the subsidized rent (basic rent) or tax credit rent as determined in accordance with requirements for the applicable federal program:
• An insured or non-insured Section 236 project;
• A formerly insured or non-insured Section 236 project that continues to receive Interest Reduction Payment following a decoupling action;
• A Section 221(d)(3) below market interest rate (BMIR) project; • A Section 515 project of the Rural Housing Service;
• Any other type of federally subsidized project specified by HUD.

Combining Subsidy
Rent to owner may not exceed any limitation required to comply with HUD subsidy layering requirements.

Rent Control [24 CFR 983.305]
In addition to the rent limits set by PBV program regulations, the amount of rent to owner may also be subject to rent control or other limits under local, state, or federal law.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

PART IX: PAYMENTS TO OWNER
17-IX.A. HOUSING ASSISTANCE PAYMENTS [24 CFR 983.351]
During the term of the HAP contract, the PHA must make housing assistance payments to the owner in accordance with the terms of the HAP contract. During the term of the HAP contract, payments must be made for each month that a contract unit complies with NSPIRE standards and is leased to and occupied by an eligible family. The housing assistance payment must be paid to the owner on or about the first day of the month for which payment is due, unless the owner and the PHA agree on a later date.

Except for discretionary vacancy payments, the PHA may not make any housing assistance payment to the owner for any month after the month when the family moves out of the unit (even if household goods or property are left in the unit).

The amount of the housing assistance payment by the PHA is the rent to owner minus the tenant rent (total tenant payment minus the utility allowance).

In order to receive housing assistance payments, the owner must comply with all provisions of the HAP contract. Unless the owner complies with all provisions of the HAP contract, the owner does not have a right to receive housing assistance payments. 17-IX.B. VACANCY PAYMENTS [24 CFR 983.352]
If an assisted family moves out of the unit, the owner may keep the housing assistance payment for the calendar month when the family moves out. However, the owner may not keep the payment if the PHA determines that the vacancy is the owner’s fault.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

At the discretion of the PHA, the HAP contract may provide for vacancy payments to the owner.

The PHA may only make vacancy payments if:
• The owner gives the PHA prompt, written notice certifying that the family has vacated the unit and identifies the date when the family moved out (to the best of the owner’s knowledge);
• The owner certifies that the vacancy is not the fault of the owner and that the unit was vacant during the period for which payment is claimed;
• The owner certifies that it has taken every reasonable action to minimize the likelihood and length of vacancy; and
• The owner provides any additional information required and requested by the PHA to verify that the owner is entitled to the vacancy payment.

The owner must submit a request for vacancy payments in the form and manner required by the PHA and must provide any information or substantiation required by the PHA to determine the amount of any vacancy payment.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-IX.C. TENANT RENT TO OWNER [24 CFR 983.353]
The tenant rent is the portion of the rent to owner paid by the family. The amount of tenant rent is determined by the PHA in accordance with HUD requirements. Any changes in the amount of tenant rent will be effective on the date stated in the PHA notice to the family and owner.

The family is responsible for paying the tenant rent (total tenant payment minus the utility allowance). The amount of the tenant rent determined by the PHA is the maximum amount the owner may charge the family for rental of a contract unit. The tenant rent covers all housing services, maintenance, equipment, and utilities to be provided by the owner. The owner may not demand or accept any rent payment from the tenant in excess of the tenant rent as determined by the PHA. The owner must immediately return any excess payment to the tenant.

Tenant and PHA Responsibilities
The family is not responsible for the portion of rent to owner that is covered by the housing assistance payment and the owner may not terminate the tenancy of an assisted family for nonpayment by the PHA.

Likewise, the PHA is responsible only for making the housing assistance payment to the owner in accordance with the HAP contract. The PHA is not responsible for paying tenant rent, or any other claim by the owner, including damage to the unit. The PHA may not use housing assistance payments or other program funds (including administrative fee reserves) to pay any part of the tenant rent or other claim by the owner.

Utility Reimbursements
If the amount of the utility allowance exceeds the total tenant payment, the PHA must pay the amount of such excess to the tenant as a reimbursement for tenant-paid utilities, and the tenant rent to the owner must be zero.

The PHA may pay the utility reimbursement directly to the family or to the utility supplier on behalf of the family. If the PHA chooses to pay the utility supplier directly, the PHA must notify the family of the amount paid to the utility supplier.

HACN Policy
This section is not applicable to HACN as PHA will not operate a project-based voucher program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

17-IX.D. OTHER FEES AND CHARGES [24 CFR 983.354]
Meals and Supportive Services
With the exception of PBV assistance in assisted living developments, the owner may not require the tenant to pay charges for meals or supportive services. Non-payment of such charges is not grounds for termination of tenancy.

In assisted living developments receiving PBV assistance, the owner may charge for meals or supportive services. These charges may not be included in the rent to owner, nor may the value of meals and supportive services be included in the calculation of the reasonable rent. However, non-payment of such charges is grounds for termination of the lease by the owner in an assisted living development.

Other Charges by Owner
The owner may not charge extra amounts for items customarily included in rent in the locality or provided at no additional cost to unsubsidized tenants in the premises.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

EXHIBIT 17-1: PBV DEVELOPMENT INFORMATION
(Fill out one for each development)
Date: [Enter the date on which this form was completed]

DEVELOPMENT INFORMATION
Development Name: [Insert name of PBV development]
Address: [Insert full address of PBV development]
Owner Information: [Insert PBV development owner name and contact information. If development is PHA-owned, enter “PHA-owned.”]
Property Management Company: [Insert property management company name and contact information, or enter “None”]
PHA-Owned: [Enter “Yes” or “No.” If yes, enter name of independent entity] Mixed Finance Development: [Enter “Yes” or “No.” If yes, list other types of funding (i.e., LIHTC, HOME, etc.) and units to which other funding applies.]

HAP CONTRACT
Effective Date of Contract: [Enter start date of HAP contract] HOTMA Requirements: [If HAP contract was signed prior to April 18, 2017, enter “PreHOTMA.” If HAP contract was signed on or after April 18, 2017, enter “Post-HOTMA.”] Term of HAP Contract: [Enter term from HAP contract]
Expiration Date of Contract: [Enter expiration date from HAP contract]

PBV UNITS
0 BR 1 BR 2 BR 3 BR 4 BR 5 BR Total
# of
Units
Initial
Contract
Rent
$ $ $ $ $ $
Structure Type: [Identify the structure type, i.e. Single Family Detached, Duplex or Two Family, Row House or Town House, Low Rise (3,4 Stories, including Garden Apartment), Highrise (5 or more stories)
Housing Type: [Identify if the units are an Independent Group Residence or Single Room Occupancy]
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

UTILITY RESPONSIBILITY
[Enter in Accordance with the HAP Exhibit C]
Utility Fuel Type
(Gas, Electric, Oil,
Coal, Other)
Paid By
(Tenant/Owner)
Provided By
(Tenant/Owner)
Heating Electric Tenant Owner
Cooking Electric Tenant Owner
Water Heating Electric Tenant Owner
Other Electric Tenant Owner
Water Owner Owner
Sewer Owner Owner
Trash Collection Owner Owner
Air Conditioning Tenant Owner
Refrigerator
Range/Microwave
Other (specify)
Accessible Units and Features: [Identify which units are accessible and describe accessibility features or enter “None”]
Target Population: [Describe targeted population in accordance with HAP contract or enter “None”]
Excepted Units: [Identify excepted unit types below or enter “None”] • Supportive Services: [Enter “Yes, see Exhibit D of HAP Contract” or enter “No”] • Elderly Units: [Enter “Yes” or “No.” If yes, identify which units are elderly units.] • Disabled Units (only for HAP contracts executed prior to April 18, 2017) [Enter “Yes” or “No.” If yes, identify which units are for persons with disabilities.] • FUPY/FYI Units: [Enter “Yes” or “No.” If yes, identify which units are FUP units] • Are units excepted because they are located in a low-poverty census tract area?:
[Enter “Yes” or “No”]
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

WAITING LIST AND SELECTION
Waiting List Type: [ Enter “Site-based waiting list,” “Combined with HCV,” “Waiting list for entire PBV program,” or “Merged with another assisted housing program”] Preferences: [Enter “Same as HCV; see Chapter 4” or describe preferences offered. If different from HCV, also note in Section 17.1.B of this policy.]
Preference Verification: [Enter “Same as HCV; see Chapter 7” or describe for each preference listed above. If different from HCV, note in Section 17.1.B of this policy.] For the PBV program, is the income limit the same as the HCV program? (Note: In mixed finance developments, other income limits may also apply.) [Enter “Same as HCV; see Chapter 3” or clearly describe. If different from HCV, note in Section 17.1.B of this policy.]

OCCUPANCY
Subsidy Standards: [Enter “Same as HCV; see Chapter 5” or describe. If different from HCV, note in Section 17.1.B of this policy]
Vacancy Payments: [Enter in accordance with HAP contract Part 1, e, 2 and Section 17-V.F. within this chapter]
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles .

Page17-68
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

EXHIBIT 17-2: Special Provisions Applying to TPVs Awarded as Part of a Voluntary Conversion of Public Housing Units in Projects that Include RAD PBV Units [24 CFR Part 972.200; Notice PIH 2019-05; Notice PIH 2019-23] Under certain circumstances, HUD allows small PHAs to reposition a public housing project (or portion of a project) by voluntarily converting units to tenant-based housing choice voucher assistance. In order to preserve affordable housing for residents of the project, the PHA is given priority to receive replacement tenant protection vouchers (TPVs). As part of the voluntary conversion, the PHA has the option to continue to operate it as rental housing. If so, the PHA or subsequent owner must allow existing families to remain in their units using the TPV in the form of tenant-based assistance. In this situation, however, the PHA may choose to project-base these TPVs in the former public housing project. Families must still be provided with the option to remain in their unit using tenant-based assistance. In order for the PHA to project-base the assistance and include these units on the PBV HAP contract, the family must voluntarily consent in writing to PBV assistance following the requirements in Appendix A of Notice PIH 2019-05.

If the family fails to consent to PBV assistance and chooses to remain using tenant-based assistance, the family’s unit is excluded from the PBV HAP contract until the family moves out or consents to switching to PBV assistance. In general, all applicable program regulations and guidance for the standard PBV program apply to these units.

The PHA may also convert units in the same former public housing project to the PBV program under the rental assistance demonstration (RAD) program. The RAD statute authorizes HUD to waive certain statutory and regulatory provisions governing the standard PBV program and specify alternative requirements. In order to facilitate the uniform treatment of residents and units at the project, Notice PIH 2019-23 extended some of the alternative requirements to nonRAD PBV units in the converted project (i.e., the TPV units in the project). As such, while PBV TPV units in the converted project generally follow the requirements for the standard PBV program listed in this chapter, where HUD has specified alternative requirements for non-RAD PBV units in the project, PBV TPV units will instead follow the requirements outlined in Chapter 18 of this policy for the RAD PBV program.

RAD Requirements Applicable to Non-RAD units in the Project Alternative Requirement
under RAD as Listed in
Notice PIH 2019-23
Standard PBV Policy
That Does Not Apply
Applicable Policy in Chapter 18

1.6.A.4. Site Selection –
Compliance with PBV Goals
17-II.G. SITE

SELECTION
STANDARDS applies
with the exception of
deconcentration of
poverty and expanding
housing and economic
opportunity
requirements.
18-II.F. SITE SELECTION

STANDARDS
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

1.6.B.5.d. PBV Site-Specific
Utility Allowances
Alternative requirement
under RAD. No
corresponding policy in
Chapter 17.
18-VII.C. UTILITY

ALLOWANCES

1.6.C.1. No Rescreening of
Tenants upon Conversion
Policies contained in
Chapter 3 relating to
eligibility do not apply
to existing tenants who
receive TPVs.
18-V.B. PROHIBITED

RESCREENING OF EXISTING

TENANTS UPON

CONVERSION

1.6.C.2. Right to Return Alternative requirement
under RAD. No
corresponding policy in
Chapter 17.
18-I.D. RELOCATION

REQUIREMENTS

1.6.C.3. Phase-in of Tenant
Rent Increases
Alternative requirements
under RAD. No
corresponding policy in
Chapter 17.
18-VIII.D. PHASE-IN OF

TENANT RENT INCREASES

1.6.C.4. Family Self
Sufficiency (FSS) and
Resident Opportunities and
Self-Sufficiency Service
Coordinator (ROSS-SC)
Programs
Not covered in
administrative plan.
18-VI.C. PUBLIC HOUSING

FSS AND ROSS

PARTICIPANTS

1.6.C.5. Resident Participation
and Funding
Alternative requirement
under RAD. No
corresponding policy in
Chapter 17.
18-VI.D. RESIDENT

PARTICIPATION AND

FUNDING

1.6.C.6. Resident Procedural
Rights
Policies related to
hearings in Chapter 16
apply, with added
procedural rights and
notice requirements as
outlined in Chapter 18.
18-VI.H. RESIDENTS’

PROCEDURAL RIGHTS

1.6.C.7. Earned Income
Disregard (EID)
Alternative requirements
under RAD for in-place
residents.

New admissions follow
policies in Chapter 6.
18-VI.G. EARNED INCOME

DISALLOWANCE

1.6.C.8. Jobs Plus Not covered in
administrative plan.

No corresponding policy.

1.6.C.9. When Total Tenant Alternative requirements 18-VI.B. LEASE, Continuation Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles
.

Page 17 ends

Payment Exceeds Gross Rent under RAD for in-place
residents.

New admissions follow
policies in 17-VII.B.

LEASE, Continuation of
Housing Assistance
Payments.
of Housing Assistance Payments

1.6.C.10. Under-Occupied
Unit
Alternative requirements
under RAD for in-place
residents.

New admissions follow
17-VII.C. MOVES,
Overcrowded, UnderOccupied, and
Accessible Units
18-VI.E. MOVES, Overcrowded,
Under-Occupied, and Accessible
Units

1.6.D.4. Establishment of
Waiting List
Alternative requirements
under RAD for initial
establishment of the
waiting list.

Once waiting list is
established, follow 17-
VI.D. SELECTION

FROM THE WAITING
LIST
18-V.D. ORGANIZATION OF

THE WAITING LIST

1.6.D.10. Initial Certifications
and Tenant Rent Calculations
Alternative requirements
under RAD for in-place
residents. No
corresponding policy in
Chapter 17.
18-VIII.C. TENANT RENT TO
OWNER, Initial Certifications
Note, while Notice PIH 2019-05 states that the PHA must screen families for eligibility for a tenant protection voucher and that families must be below the low-income limit (80 percent of AMI), Notice PIH 2019-23 waives these requirements for residents in projects that include RAD PBV units.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles .

Page17-72
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

Chapter 18

PROJECT BASED VOUCHERS (PBV) UNDER THE RENTAL ASSISTANCE

DEMONSTRATION (RAD) PROGRAM

INTRODUCTION
This chapter describeps HUD regulations and PHA policies related to the Project-Based Voucher (PBV) program under the Rental Assistance Demonstration (RAD) program in eight parts:

Part I: General Requirements. This part describes general provisions of the PBV program, including maximum budget authority requirements, relocation requirements, and equal opportunity requirements.

Part II: PBV Project Selection. This part describes the cap on assistance at projects receiving PBV assistance, ownership and control, and site selection standards.

Part III: Dwelling Units. This part describes requirements related to NSPIRE standards, the type and frequency of inspections, and housing accessibility for persons with disabilities.

Part IV: Housing Assistance Payments Contract. This part discusses HAP contract requirements and policies including the execution and term of the HAP contract.

Part V: Selection of PBV Program Participants. This part describes the requirements and policies governing how the PHA and the owner will select a family to receive PBV assistance.

Part VI: Occupancy. This part discusses occupancy requirements related to the lease and describes under what conditions families are allowed or required to move.

Part VII: Determining Contract Rent. This part describes how the initial rent to owner is determined, and how rent will be redetermined throughout the life of the HAP contract.

Part VIII: Payments to Owner. This part describes the types of payments owners may receive under this program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

PART I: GENERAL REQUIREMENTS
18-I.A. OVERVIEW AND HISTORY OF THE RAD PROGRAM
The Rental Assistance Demonstration (RAD) program was authorized in 2012 in order to assess the effectiveness of converting public housing, moderate rehabilitation properties, and units under the rent supplement and rental assistance payments programs to long-term, project-based Section 8 rental assistance. The program’s four primary objectives are to:
• Preserve and improve public and other assisted housing. • Standardize the administration of the plethora of federally subsidized housing programs and rules. The conversions are intended to promote operating efficiency by using a Section 8 project-based assistance model that has proven successful and effective for over 30 years.

In other words, RAD aligns eligible properties more closely with other affordable housing programs.
• Attract private market capital for property renovations. Through the use of this model, properties may be able to leverage private debt and equity to make capital repairs. • Increase tenant mobility opportunities.

Under the first component, a PHA with public housing units may submit an application to HUD to convert some or all of their public housing units to long-term, project-based Section 8 HAP contracts under either:
• Project-based rental assistance (PBRA) under HUD’s Office of Multifamily Housing Programs.
• Project-based vouchers (PBVs) under HUD’s Office of Public and Indian Housing (PIH).

This chapter will focus on public housing conversions to the PBV program under RAD. In order to distinguish between requirements for public housing conversion under RAD and PBV units under the standard PBV program, we will refer to the standard PBV program and the RAD PBV program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-I.B. APPLICABLE REGULATIONS
On the whole, the regulations for both the standard and RAD PBV programs generally follow the regulations for the tenant-based HCV program found at 24 CFR Part 982. However, important parts of the tenant-based regulations do not apply to the project-based program. 24 CFR Part 983 outlines the sections of 24 CFR Part 982 that are not applicable to the project-based program.

For the RAD PBV program, Congress authorized HUD to waive certain statutory and regulatory provisions or establish alternative requirements from the standard PBV program. These provisions are identified in Notice PIH 2019-23 (issued September 5, 2019). Any non-RAD PBV units located in the covered project are subject to the same waivers and alternative requirements where noted in Notice PIH 2019-23 and in this policy.

Otherwise, all regulatory and statutory requirements for the standard PBV program in 24 CFR Part 983 and Section 8(o)(13) of the Housing Act of 1937, and all applicable standing and subsequent Office of Public and Indian Housing (PIH) notices and guidance, including related handbooks, apply to RAD PBV. This includes environmental review, Davis-Bacon, and fair housing requirements.

RAD is authorized by the Consolidated and Further Continuing Appropriations Act of 2012 (Public Law 112-55, approved November 18, 2011), as amended by the Consolidated Appropriations Act of 2014 (Public Law 113-76, approved January 17, 2014), the Consolidated and Further Continuing Appropriations Act of 2015 (Public Law 113-235, approved December 6, 2014), the Consolidated Appropriations Act of 2016 (Public Law 114-113, approved December 18, 2015), the Consolidated Appropriations Act, 2017 (Public Law 115-31, approved May 5, 2017), and section 237 of Title II, Division L, Transportation, Housing and Urban Development, and Related Agencies, of the Consolidated Appropriations Act, 2018 (Public Law 115-141, approved March 23, 2018) collectively, the “RAD Statute.” Requirements specific to the RAD program may be found in the following:
• Generally, public housing projects converting assistance under RAD are bound by the terms of the notice in effect at the time of closing. For all conversion types, HUD reserves the right, in its sole discretion and upon request from the applicant, to apply provisions from previous versions of this notice to program participants that are near conversion. - Notice PIH 2023-19 amends Notice PIH 2019-23 and Notice PIH 2021-07, and was effective immediately.
- Notice PIH 2019-23 was immediately applicable at the time of closing to all projects converting assistance (notwithstanding execution of a commitment for conversion).

Notice PIH 2019-23 was published on September 5, 2019.
 Except with respect to changes in the project eligibility and selection criteria, not included in this policy, which are effective after a 30-day comment period. - Notice PIH 2012-32, REV-3 was applicable to projects that were seeking conversion of assistance through RAD, including those where a CHAP had already been issued when it was published January 12, 2017.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

 Except with respect to changes in the project eligibility and selection criteria, not included in this policy, which were effective after a 30-day comment period.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

- Notice PIH 2012-32, REV-2 was applicable to projects that were seeking conversion of assistance through RAD, including those where a CHAP had already been issued when it was published June 15, 2015.
 Except with respect to changes in the project eligibility and selection criteria, not included in this policy, which are effective after a 30-day comment period. • RAD Quick Reference Guide for Public Housing Converting to PBV Assistance (6/20) • RAD Welcome Guide for New Awardees: RAD 1st Component (3/15) • Notice PIH 2016-17, Rental Assistance Demonstration (RAD) Notice Regarding Fair Housing and Civil Rights Requirements and Relocation Requirements Applicable to RAD First Component – Public Housing Conversions.
- This Notice applies to all projects that have applied for RAD conversion but have not yet converted as of November 10, 2016.
• Notice PIH 2014-17, Relocation Requirements under the RAD Program, Public Housing in the First Component.
- This notice may apply to projects that have converted to RAD prior to November 10, 2016, AND who have requested and received approval from HUD to be governed by this notice. See PIH Notice 2016-17, Section 1, Paragraph 1.3 for applicability.

NOTE: The policies in this chapter follow Notice PIH 2016-17. If your project falls under PIH 2014-17, applicable policies may be found in Section 18-I.D. • RAD FAQs (http://www.radresource.net/search.cfm)
HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-I.C. TENANT-BASED VS. PROJECT-BASED VOUCHER ASSISTANCE [24 CFR 983.2]
Much of the tenant-based voucher program regulations also apply to the PBV program.

Consequently, many of the PHA policies related to tenant-based assistance also apply to RAD PBV assistance. The provisions of the tenant-based voucher regulations that do not apply to the PBV program are listed at 24 CFR 983.2.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.
18-I.D. RELOCATION REQUIREMENTS
For projects that apply for conversion of assistance under the First Component of RAD and will convert November 10, 2016 or later, the following applies [Notice PIH 2016-17]:
• In some developments, in-place residents may need to be relocated as a result of properties undergoing repairs, being demolished and rebuilt, or when assistance is transferred from one site to another. RAD program rules prohibit the permanent, involuntary relocation of residents as a result of conversion. Residents that are temporarily relocated retain the right to return to the project once it has been completed. Any non-RAD PBV units located in the same project are also subject to the right to return.
• Relocation assistance provided to residents will vary depending on the length of time relocation is required. Residents must be properly notified in advance of relocation requirements in accordance with RAD program rules and Uniform Relocation Act (URA) requirements, and other requirements which may be applicable such as Section 104(d) of the Housing and Community Development Act of 1974, as amended. Sample informing notices are provided in Appendices 2–5 of Notice PIH 2014-17. A written relocation plan is required if the RAD conversion involves permanent relocation (including a move in connection with a transfer of assistance) or temporary relocation anticipated to last longer than a year. While the PHA is not required to have a written relocation plan for temporary relocation lasting one year or less, HUD strongly encourages PHAs to prepare one. Appendix II of Notice PIH 2016-17 contains recommended contents for a relocation plan. • In addition, PHAs must undertake a planning process that complies with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended (URA), although not all relocations under RAD will trigger requirements under URA. URA statute and implementing regulations may be found at 49 CFR Part 24. The obligation due to relocating residents under RAD are broader than URA relocation assistance and payments.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

• Any residents that may need to be temporarily relocated to facilitate rehabilitation or construction will have a right to return to either: a) a unit at the development once rehabilitation or construction is completed, provided the resident’s household is not underhoused; or b) a unit in the development which provides the same major features as the resident’s unit in the development prior to the implementation of the RAD conversion. • Where the transfer of assistance to a new site is warranted and approved, residents of the converting development will have the right to reside in an assisted unit at the new site once rehabilitation or construction is complete.
• If the PHA’s proposed plans for conversion would preclude a resident from returning to the development, the resident must be given an opportunity to comment and/or object to such plans. PHAs must alter the project plans to accommodate the resident’s right to return to the development if the resident would be precluded from returning to the development. • Examples of project plans that may preclude a resident from returning to the development include, but are not limited to:
- Changes in the development’s bedroom distribution that decrease the size of the units, resulting in the resident being under-housed;
- The resident cannot be accommodated in the remaining assisted units due to a reduction in the number of assisted units at the development;
- Income limit eligibility requirements associated with the LIHTC program or another program; and
- Failure to provide a reasonable accommodation, in violation of applicable law, where reasonable accommodation may include installation of accessibility features that are needed by the resident.
• Residents of a development undergoing conversion that would be precluded from returning to the development may voluntarily accept a PHA or owner’s offer to permanently relocate to alternative housing, and thereby waive their right to return to the development after rehabilitation or construction is completed. In this event, the PHA must secure the resident’s written consent to a voluntary permanent relocation in lieu of returning to the development.

PHAs are prohibited from employing any tactics to pressure residents into relinquishing their right to return or accepting other housing options. Additionally, a PHA may not terminate a resident’s lease if the PHA fails to obtain the resident’s consent and the resident seeks to exercise the right to return.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

• In the case of multi-phase RAD transactions, the resident has a right to return to the development or to other converted phases of the development that are available for occupancy at the time the resident is eligible to exercise their right of return. Generally, the resident’s right to return must be accommodated within the development associated with the resident’s original unit, however, the PHA may treat multiple converted developments on the same site as one for purposes of right to return. Should the PHA seek to have the resident exercise the right to return at a future phase, the PHA must secure the resident’s consent in writing.
• Alternative housing options may involve a variety of housing options, including but not limited to:
- Transfers to public housing
- Admission to other affordable housing properties subject to the applicable program rules - Housing choice voucher (HCV) assistance
- Homeownership programs subject to the applicable program rules - Other options identified by the PHA
However, for projects that applied for conversion prior to November 10, 2016, the following applies [Notice PIH 2014-17]:
• In some developments, in-place residents may need to be relocated as a result of properties undergoing repairs, being demolished and rebuilt, or when assistance is transferred from one site to another. RAD program rules prohibit the permanent, involuntary relocation of residents as a result of conversion. Residents that are temporarily relocated retain the right to return to the project once it has been completed.
• Relocation assistance provided to residents will vary depending on the length of time relocation is required. Residents must be properly notified in advance of relocation requirements in accordance with RAD program rules and Uniform Relocation Act (URA) requirements. Sample informing notices are provided in Appendices 2–5 of Notice PIH 2014-17. While the PHA is not required to have a written relocation plan, HUD strongly encourages PHAs to prepare one. Appendix I of Notice PIH 2014-17 contains recommended contents for a relocation plan.
• In addition, PHAs must undertake a planning process that complies with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended (URA), although not all relocations under RAD will trigger requirements under URA. URA statute and implementing regulations may be found at 49 CFR Part 24. • Any residents that may need to be temporarily relocated to facilitate rehabilitation or construction will have a right to return to an assisted unit at the development once rehabilitation or construction is completed. Where the transfer of assistance to a new site is warranted and approved, residents of the converting development will have the right to reside in an assisted unit at the new site once rehabilitation or construction is complete. Residents of a development undergoing conversion of assistance may voluntarily accept a PHA or Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

owner’s offer to permanently relocate to another assisted unit, and thereby waive their right to return to the development after rehabilitation or construction is completed.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-I.E. EQUAL OPPORTUNITY REQUIREMENTS [24 CFR 983.8; 24 CFR 5.105; Notice PIH 2016-17]
RAD conversions are governed by the same civil rights authorities that govern HUD-assisted activities in general. These authorities prohibit discrimination and impose affirmative obligations on HUD program participants. PHAs must comply with all applicable fair housing and civil rights laws, including but not limited to the Fair Housing Act, Title VI of the Civil Rights Act of 1964, and Section 504 of the Rehabilitation Act of 1973, when conducting relocation planning and providing relocation assistance. For example, persons with disabilities returning to the RAD project may not be turned away or placed on a waiting list due to a lack of accessible units. Their need for an accessible unit must be accommodated. See the RAD Fair Housing, Civil Rights, and Relocation Notice [Notice PIH 2016-17] for more information.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

PART II: PBV PROJECT SELECTION
18-II.A. OVERVIEW
Unlike in the standard PBV program where the PHA typically selects the property through an owner proposal selection process, projects selected for assistance under RAD PBV are selected in accordance with the provisions in Notice PIH 2019-23. Therefore, 24 CFR 983.51 does not apply since HUD selects RAD properties through a competitive selection process. 18-II.B. OWNERSHIP AND CONTROL [Notice PIH 2019-23]
For projects governed by Notice PIH 2019-23, the following language applies:
• Under the PBV program, the contract administrator and the owner listed on the contract cannot be the same legal entity (i.e., the PHA cannot execute a contract with itself). To avoid this situation, the PHA may either: 1) Transfer the ownership of the project to a nonprofit affiliate or instrumentality of the PHA (including to a “single-purpose entity” that owns nothing other than the property, which will typically be a requirement of a lender or investor), or 2) The PHA can form a related entity that is responsible for management and leasing and can serve as the owner for purposes of the Section 8 HAP contract; in this scenario, the HAP is then executed between the PHA (as the contract administrator) and the PHA’s related entity (as the owner for HAP contract purposes). Note that in the second scenario, both the PHA and the entity serving as the owner for HAP contract purposes will be required to sign the RAD Use Agreement [RAD Resource Desk FAQ 01/24/19]. • Except where permitted to facilitate the use of low-income housing tax credits, during both the initial term and renewal terms of the HAP contract, ownership must be by a public or nonprofit entity. HUD may also allow ownership of the project to be transferred to a tax credit entity controlled by a for-profit entity to facilitate the use of tax credits for the project, but only if HUD determines that the PHA or a nonprofit entity preserves an interest in the profit. The requirement for a public or nonprofit entity, or preservation of an interest by a PHA or nonprofit in a property owned by a tax credit entity controlled by a for-profit entity, is satisfied if a public or nonprofit entity (or entities), directly or through a wholly owned affiliate (1) holds a fee simple interest in the property; (2) is the lessor under a ground lease with the property owner; (3) has the direct or indirect legal authority to direct the financial and legal interest of the property owner with respect to the RAD units, (4) owns 51 percent or more of the general partner interests in a limited partnership or 51 percent or more of the managing member interests in a limited liability company with all powers of a general partner or managing member, as applicable; (5) owns a lesser percentage of the general partner or managing member interests and holds certain control rights as approved by HUD; (6) owns 51 percent or more of all ownership interests in a limited partnership or limited liability company and holds certain control rights as approved by HUD; or (7) demonstrates other ownership and control arrangements approved by HUD.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

• Control may be established through the terms of the project owner’s governing documents or through a Control Agreement, provided that in either case amendment of the terms of control requires consent from HUD.

For projects subject to the requirements of Notice PIH 2012-32, REV-3, the following language applies:
• Except where permitted to facilitate the use of low-income housing tax credits, during both the initial term and renewal terms of the HAP contract, ownership must be by a public or nonprofit entity. The requirement for a public or nonprofit entity is satisfied if a public or nonprofit entity (or entities), directly or through a wholly owned affiliate (1) holds a fee simple interest in the property; (2) is the lessor under a ground lease with the property owner; (3) has the direct or indirect legal authority to direct the financial and legal interest of the property owner with respect to the RAD units, (4) owns 51 percent or more of the general partner interests in a limited partnership or 51 percent or more of the managing member interests in a limited liability company with all powers of a general partner or managing member, as applicable; (5) owns a lesser percentage of the general partner or managing member interests and holds certain control rights as approved by HUD; (6) owns 51 percent or more of all ownership interests in a limited partnership or limited liability company and holds certain control rights as approved by HUD; or (7) other ownership and control arrangements approved by HUD.
• If low-income housing tax credits will be used, HUD may allow ownership of the property to be transferred to a tax credit entity controlled by a for-profit entity if HUD determines that the PHA preserves its interest in the property. Preservation of PHA interest in the property includes but is not limited to the following:
- The PHA, or an affiliate under its sole control, is the general partner or managing member;
- The PHA retains fee ownership and leases the real estate to the tax credit entity pursuant to a long-term ground lease;
- The PHA retains control over leasing the property and determining program eligibility; - The PHA enters into a control agreement by which the PHA retains consent rights over certain acts of the project owner and retains certain rights over the project; - Other means that HUD finds acceptable
For projects that converted assistance prior to the implementation of Notice PIH 2012-32, REV-3, the following language applies:
• During both the initial term and renewal terms of the HAP contract, ownership must be either of the following:
- A public or nonprofit entity that has legal title to the property. The entity must have the legal authority to direct the financial, legal, beneficial, and other interests of the property; or
- A private entity, if the property has low-income tax credits. The PHA must maintain control via a ground lease.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-II.C. PHA-OWNED UNITS [24 CFR 983.59, FR Notice 1/18/17, and Notice PIH 2017-21]
If the project is PHA-owned, rent-setting and inspection functions set out in 24 CFR 983.59 must be conducted by an independent entity approved by HUD.

The definition of ownership or control provided under Notice PIH 2019-23 (listed above) is used specifically to determine whether a PHA retains control over a project for purposes of HUD’s requirement for ownership or control of the covered project under RAD. For purposes of determining whether an independent entity will perform certain functions for the project, the definition of PHA-owned under Notice PIH 2017-21 is used. This is the same definition used for standard PBV units. In some cases, a project may meet the RAD definition of ownership or control but may not be considered PHA-owned for purposes of requiring an independent entity.

The independent entity that performs the program services may be the unit of general local government for the PHA jurisdiction (unless the PHA is itself the unit of general local government or an agency of such government), or another HUD-approved public or private independent entity.

The PHA may compensate the independent entity from PHA ongoing administrative fee income (including amounts credited to the administrative fee reserve). The PHA may not use other program receipts to compensate the independent entity for its services. The PHA, and the independent entity, may not charge the family any fee for the services provided by the independent entity.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-II.D. SUBSIDY LAYERING REQUIREMENTS [Notice PIH 2019-23; Notice PIH 2012-32, REV-3; Notice PIH 2012-32, REV-2]
For projects governed by Notice PIH 2019-23, the following language applies:
• In the case of a PHA that will no longer have ACC units as a result of the pending or simultaneous closing, or have less than 50 units remaining and have initiated procedures to dispose of their final ACC units, there is no restriction on the amount of public housing funds that may be contributed to the covered project or projects though the conversion. However, the PHA must estimate and plan for outstanding liabilities and costs and must follow Notice PIH 2016-23 or successor notice regarding the administrative activities required to terminate the ACC if it has no plans to develop additional public housing. • In the case where the PHA will continue to maintain other units in its inventory under a public housing ACC, a contribution of operating funds to the covered project that exceeds the average amount the project has held in operating reserves over the past three years will trigger a subsidy layering review under 24 CFR 4.13. Similarly, any contribution of capital funds, including Replacement Housing Factor (RHF) or Demolition Disposition Transitional Funding (DDTF), will trigger a subsidy layering review. Notwithstanding the subsidy layering review, PHAs should be mindful of how the capital funds or operating reserves used in the financing of its RAD properties may impact the physical and financial health of properties that will remain in its public housing inventory. • Following execution of the HAP contract, PHAs are authorized to use operating and capital funds to make HAP payments for the remainder of the first calendar year in which the HAP contract is effective. Otherwise, a PHA may not contribute public housing program funds to the covered project unless those funds have been identified in the RCC and converted at closing for Section 8 RAD purposes.

For projects governed by Notice PIH 2012-32, REV-3, the following language applies:
• In the case of a PHA that is converting all of its ACC units, there is no restriction on the amount of public housing funds that may be contributed to the covered project at closing; the PHA may convey all program funds to the covered projects. In order to cover the cost of administrative activities required to terminate the ACC, once it no longer has units under the ACC and has no plans to develop additional public housing, the PHA may:
- Designate that a reserve associated with the project be available to fund any public housing closeout costs (such as an operating deficit reserve or a specific PHA closeout reserve). Any funds not needed for public housing closeout costs would remain in such reserve or may be transferred to another reserve associated with the project (such as the replacement reserve). Thereafter, these funds may be used at the project pursuant to the authorized use of the applicable reserve; or
- Retain funds under the public housing program for this purpose. However, HUD will recapture any public housing funds that a PHA does not expend for closeout costs.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

• In the case where the PHA will continue to maintain other units in its inventory under a public housing ACC, a contribution of operating funds to the covered project that exceeds the average amount the project has held in operating reserves over the past three years will trigger a subsidy layering review under 24 CFR 4.13. Similarly, any contribution of capital funds, including Replacement Housing Factor (RHF) or Demolition Disposition Transitional Funding (DDTF), will trigger a subsidy layering review. Notwithstanding the subsidy layering review, PHAs should be mindful of how the capital funds or operating reserves used in the financing of its RAD properties may impact the physical and financial health of properties that will remain in its public housing inventory. • In addition, following execution of the HAP contract, PHAs are authorized to use operating and capital funds to make HAP payments for the remainder of the first calendar year in which the HAP contract is effective. Otherwise, a PHA may not contribute public housing program funds to the covered project unless such funding has been identified in the approved financing plan and included in the approved “sources and uses” attached to the RCC.

For projects governed by the requirements of Notice PIH 2012-32, REV-2, the following language applies:
• In the case of a PHA that is converting all of its ACC units, there is no restriction on the amount of public housing funds that may be contributed to the covered project at closing; the PHA may convey all program funds to the covered project. HUD will recapture any public housing funds that a PHA has not expended once it no longer has units under ACC. In the case where the PHA will continue to maintain other units in its inventory under a public housing ACC, a contribution of operating funds to the covered project that exceeds the average amount the project has held in operating reserves over the past three years will trigger a subsidy layering review under 24 CFR 4.13. Similarly, any contribution of capital funds, including Replacement Housing Factor (RHF) or Demolition Disposition Transitional Funding (DDTF), will trigger a subsidy layering review. Notwithstanding the subsidy layering review, PHAs should be mindful of how the capital funds or operating reserves used in the financing of its RAD properties may impact the physical and financial health of properties that will remain in its public housing inventory.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-II.E. PBV PERCENTAGE LIMITATION AND UNIT CAP [Notice PIH 2019-23 and Notice PIH 2023-19]
PBV Percentage Limitation
Covered projects do not count against the maximum amount of assistance a PHA may utilize for the PBV program, which under the standard PBV program is set at 20 percent of the authorized units allocated to a PHA under the HCV program. The number of PBV units excluded from the PHA’s PBV program cap cannot exceed the number of former public housing units that those PBV units are replacing through the course of the RAD conversion. All PBV units in a covered project that replace former public housing units at the time of conversion are excluded from both the numerator and the denominator when calculating the percent of vouchers that may be projectbased by a PHA. To implement this provision, HUD is waiving section 8(o)(13)(B) of the 1937 Act as well as 24 CFR 983.6.

Unit Cap Limitation
When HUD published REV-3 of Notice PIH 2012-32, the cap on the number of assisted units in each project was eliminated. Under the standard PBV program the cap is set at the greater of 25 units or 25 percent of the units in the project. HUD is waiving this requirement, and projects governed by Notice PIH 2019-23 and Notice PIH 2012-32, REV-3 have no cap on the number of units that may receive PBV assistance in a project.

However, for projects that are governed by REV-2 of Notice PIH 2012-32, the cap on the number of PBV units in the project is increased to 50 percent. In these projects, however, provided units met certain exception criteria, the PHA may have converted a larger number of units to RAD PBV. For projects governed by the requirements of Notice PIH 2012-32, REV-2 only, the following language applies:
• In general, the PHA may not provide PBV assistance for units in a project if the total number of dwelling units in the project that will receive PBV assistance during the term of the PBV HAP contract is more than 50 percent of the number of dwelling units (assisted or unassisted) in the project. However, PHAs may exceed the 50 percent limitation when units in the project are occupied by elderly and/or disabled families or families that will receive supportive services. These units are known as “excepted units” and do not count toward the project cap.
• For projects governed by the requirements of Notice PIH 2012-32, REV-2 choosing to include excepted units, additional policy decisions may be required.

HACN Policy
For projects governed by Notice PIH 2012-32, REV-2, the PHA will not provide RAD PBV assistance for any excepted units.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-II.F. SITE SELECTION STANDARDS [Notice PIH 2019-23; Notice PIH 2016-17] Site selection requirements set forth in 24 CFR 983.57 apply to RAD PBV, with the exception of 983.57(b)(1) and (c)(2). HUD waives the provisions regarding deconcentration of poverty and expanding housing and economic opportunity for existing housing sites.

To facilitate the uniform treatment of residents and units, any non-RAD PBV units located in the same project are subject to the terms of this provision.

HUD will conduct a front-end civil rights review of the PHA’s proposed site in certain circumstances. For RAD PBV conversions that involve new construction located in an area of minority concentration (whether on the existing public housing site or on a new site) HUD will determine whether it meets one of the exceptions that would allow for new construction in an area of minority concentration.

The PHA must ensure that its RAD PBV conversion, including any associated new construction, is consistent with its certification to affirmatively further fair housing and complies with civil rights laws.
18-II.G. ENVIRONMENTAL REVIEW [Notice PIH 2019-23; Environmental Review Requirements for RAD Conversions, March 2019]
HUD cannot approve an applicant’s financing plan submission unless and until the required environmental review has been completed for the applicant’s proposed conversion project and found to meet environmental review requirements. Environmental documents must be submitted no later than the applicant’s financing plan. HUD will not issue a RAD Conversion Commitment (RCC) if the project plan does not meet the environmental review requirements described in Attachment 1A of Notice PIH 2019-23. Once an awardee has submitted an application for a specific project, they may not make any choice limiting actions before the completion of the environmental review.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

PART III: DWELLING UNITS
18-III.A. OVERVIEW
This part identifies the special housing quality standards that apply to the RAD PBV program, housing accessibility for persons with disabilities, and special procedures for NSPIRE inspections.
18-III.B. NATIONAL STANDARDS FOR THE PHYSICAL INSPECTION OF REAL ESTATE (NSPIRE) [24 CFR 983.101 and 24 CFR 5.703]
NSPIRE standards for the tenant-based program generally apply to the PBV program. NSPIRE requirements for shared housing, manufactured home space rental, and the homeownership option do not apply because these housing types are not assisted under the PBV program.

Lead-based Paint [24 CFR 983.101(c); Notice PIH 2019-23] The lead-based paint requirements for the tenant-based voucher program do not apply to the PBV program. Instead, The Lead-based Paint Poisoning Prevention Act (42 U.S.C. 4821-4846), the Residential Lead-based Paint Hazard Reduction Act of 1992 (42 U.S.C. 4851-4856), and implementing regulations at 24 CFR part 35, subparts A, B, H, and R, and 40 CFR 745.227, apply to the PBV program.
18-III.C. HOUSING ACCESSIBILITY FOR PERSONS WITH DISABILITIES [Notice PIH 2016-17]
Federal accessibility requirements apply to all conversions, whether they entail new construction, alternations, or existing facilities. The housing must comply with program accessibility requirements of section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and implementing regulations at 24 CFR part 8. The PHA must ensure that the percentage of accessible dwelling units complies with the requirements of section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794), as implemented by HUD’s regulations at 24 CFR 8, subpart C.

Housing first occupied after March 13, 1991, must comply with design and construction requirements of the Fair Housing Amendments Act of 1988 and implementing regulations at 24 CFR 100.205, as applicable. (24 CFR 983.102)
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-III.D. INSPECTING UNITS
Initial Inspection [RAD Quick Reference Guide, Notice PIH 2019-23, and Notice PIH 2023-19]
Under standard PBV regulations at 24 CFR 983.103(b), a PHA may not enter into a HAP contract until the PHA has determined all units comply with NSPIRE standards. It is the responsibility of the contract administrator to perform this initial inspection (unless units are PHA-owned). In order to accommodate projects in which repairs are conducted, however, HUD has waived this requirement when units are undergoing rehabilitation. In this case, units must meet NSPIRE standards by the date indicated in the RAD Conversion Commitment (RCC). To place the unit under HAP contract and commence making payments, the PHA may rely on the owner’s certification that the owner has no reasonable basis to have knowledge that lifethreatening conditions exist in the unit or units to be added to the HAP contract instead of conducting an initial inspection. During the period of the work, NSPIRE requirements apply. The PHA must enforce the project owner’s obligations and conduct inspections when needed, (for example in response to tenant complaints or other information coming to its attention), and the owner must correct any deficiencies in accordance with NSPIRE requirements (i.e., no more than 24 hours for a life-threatening deficiency, and within no more than 30 calendar days or any PHA-approved extension for other defects, but no later than the date of the completion of the work as indicated in the RCC).

Turnover Inspections [24 CFR 983.103(c), FR Notice 1/18/17, and Notice PIH 2017-20] Before providing assistance to a new family in a contract unit, the PHA must inspect the unit.

The PHA may not provide assistance on behalf of the family until the unit fully complies with NSPIRE.

Annual/Biennial Inspections [24 CFR 983.103(d); FR Notice 6/25/14] At least once every 24 months (or once every 36 months for small rural PHAs) during the term of the HAP contract, the PHA must inspect a random sample consisting of at least 20 percent of the contract units in each building, to determine if the contract units and the premises are maintained in accordance with NSPIRE. Turnover inspections are not counted toward meeting this inspection requirement.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

Alternative Inspections [24 CFR 983.103(g); Notice PIH 2016-05] In the case of mixed-finance properties that are subject to alternative inspections, the PHA may rely upon an alternative inspection conducted at least triennially to demonstrate compliance with inspection requirements.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Other Inspections [24 CFR 983.103(e)]
The PHA must inspect contract units whenever needed to determine that the contract units comply with NSPIRE and that the owner is providing maintenance, utilities, and other services in accordance with the HAP contract. The PHA must take into account complaints and any other information coming to its attention in scheduling inspections.

The PHA must conduct follow-up inspections needed to determine if the owner (or, if applicable, the family) has corrected an NSPIRE deficiency and must conduct inspections to determine the basis for exercise of contractual and other remedies for owner or family violation of NSPIRE standards.

In conducting PHA supervisory quality control inspections, the PHA should include a representative sample of both tenant-based and project-based units.

Inspecting PHA-Owned Units [24 CFR 983.103(f); Notice PIH 2017-21] In the case of PHA-owned units, all required inspections must be performed by an independent entity designated by the PHA and approved by HUD. The independent entity must furnish a copy of each inspection report to the PHA and to the HUD field office where the project is located.

The PHA must take all necessary actions in response to inspection reports from the independent agency, including exercise of contractual remedies for violation of the HAP contract by the PHA-owner.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

PART IV: HOUSING ASSISTANCE PAYMENTS (HAP) CONTRACT
18-IV.A. OVERVIEW [RAD PBV Quick Reference Guide 6/20]
Public housing projects converting under RAD do not employ the PBV Agreement to Enter into a Housing Assistance Payments (AHAP) contract. Instead, following the execution of all requirements contained in the Commitment to Enter into a HAP (CHAP) contract and the RAD Conversion Commitment (RCC), a project is converted immediately to the RAD PBV HAP contract following the closing of any construction financing. Owners of public housing projects converted to PBV assistance via RAD enter into a HAP contract with the PHA that will administer the PBV assistance. Units assisted under a RAD PBV HAP contract must be subject to long-term, renewable use and affordability restrictions. 18-IV.B. HAP CONTRACT REQUIREMENTS
Contract Information [RAD PBV Quick Reference Guide 6/20; Notice PIH 2019-23] The RAD PBV program uses the PBV HAP contract for new construction or rehabilitated housing (Form HUD-52530A), as modified by the RAD rider (Form HUD-52621). For closings on or after January 1, 2018, HUD incorporated the RAD rider directly into the standard PBV HAP contract. For closing that occurred prior to January 1, 2018, the RAD rider must be attached to the PBV HAP contract.

The distinction between “existing housing” and “rehabilitated and newly constructed housing” is overridden by RAD requirements. The project must also have an initial RAD use agreement. All public housing RAD conversion properties financed with LIHTC are also required to include an LIHTC rider.

Execution and Effective date of the HAP Contract [RADBlast! 7/11/16] RAD PBV projects do not employ an Agreement to Enter into a Housing Assistance Payments (AHAP) contract like in the standard PBV program. Rather, when the conditions of the CHAP and the RCC are met and the conversion has closed, the PHA executes the HAP contract. Project owners may select the effective date of the HAP contract as the first day of either of the two months following the completed closing.

Term of HAP Contract [Notice PIH 2019-23]
The initial term of the HAP contract may not be for less than 15 years and may be for a term of up to 20 years upon request of the owner and with approval of the administering voucher agency.

Upon expiration of the initial term of the contract, and upon each renewal term of the contract, the owner must accept each offer to renew the contract, for the prescribed number and mix of units, either on the site of the project subject to the expiring contract or, upon request of the project owner and subject to PHA and HUD approval, at another site through a future transfer of assistance. Contracts are subject to the terms and conditions applicable at the time of each offer and further subject to the availability of appropriations for each year of each such renewal. To implement this provision, HUD is waiving section 8(o)(13)(F) of The United States Housing Act of 1937, which permits a minimum term of one year, as well as 24 CFR 983.205(a), which governs the contract term.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

Agreement to Enter into a HAP (AHAP) Contract [Notice PIH 2019-23] For public housing conversions to PBV, there will be no agreement to enter into a Housing Assistance Payments (AHAP) contract. Therefore, all regulatory references to the Agreement (AHAP), including regulations under 24 CFR Part 983 Subpart D, are waived. The definitions for proposal selection date, new construction, rehabilitation, and existing housing are not applicable.

Mandatory Contract Renewal [Notice PIH 2019-23]
By statue, upon contact expiration, the agency administering the vouchers will offer, and the PHA will accept, renewal of the contract for the prescribed number and mix of units, either on the site of the project subject to the expiring contract or, upon request of the project owner and subject to PHA and HUD approval, at another site through a future transfer of assistance. The contract is subject to the terms and conditions applicable at the time of renewal and the availability of appropriations each year for such renewal. Consequently 24 CFR 983.205(b), governing the PHA discretion to renew the contract, will not apply.

In the event that the HAP contract is removed due to breach, non-compliance or insufficiency of appropriations, for all units previously covered under the HAP contract, new tenants must have incomes at or below 80 percent of the area median income at the time of admission and rents may not exceed 30 percent of 80 percent of median income for an appropriate size unit for the remainder of the term of the RAD use agreement.

Remedies for NSPIRE Deficiencies [24 CFR 983.208(b)]
The PHA may not make any HAP payment to the owner for a contract unit during any period in which the unit does not comply with NSPIRE. If the PHA determines that a contract unit does not comply with NSPIRE standards, the PHA may exercise any of its remedies under the HAP contract, for any or all of the contract units. Available remedies include termination of housing assistance payments, abatement or reduction of housing assistance payments, reduction of contract units, and termination of the HAP contract.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-IV.C. AMENDMENTS TO THE HAP CONTRACT
Floating Units [Notice PIH 2019-23]
Upon request of the owner to the voucher agency that will administer the project, HUD will permit assistance to float among units within the project that are the same bedroom size. The unit to which assistance is floated must be comparable to the unit being replaced in quality and amenities.

If the PHA chooses to float units, units are not specifically identified on the HAP contract, rather the HAP contract must specify the number and type of units in the property that are RAD PBV units. The property must maintain the same number and type of RAD units from the time of the initial HAP contract execution forward.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Reduction in HAP Contract Units [Notice PIH 2019-23]
Project owners are required to make available for occupancy by eligible tenants the number of assisted units under the terms of the HAP contract.

The PHA may not reduce the number of assisted units without written HUD approval. Any HUD approval of a PHA’s request to reduce the number of assisted units under contract is subject to conditions that HUD may impose. MTW agencies may not alter this requirement.

If units are removed from the HAP contract because a new admission’s TTP comes to equal or exceed the gross rent for the unit and if the project is fully assisted, the PHA must reinstate the unit after the family has vacated the property. If the project is partially assisted, the PHA may substitute a different unit for the unit on the HAP contract in accordance with 24 CFR 983.207, or where the development has “floating” units.
18-IV.D. HAP CONTRACT YEAR AND ANNIVERSARY DATES [24 CFR 983.302(e)] The HAP contract year is the period of 12 calendar months preceding each annual anniversary of the HAP contract during the HAP contract term. The initial contract year is calculated from the first day of the first calendar month of the HAP contract term.

The annual anniversary of the HAP contract is the first day of the first calendar month after the end of the preceding contract year. There is a single annual anniversary date for all units under a particular HAP contract.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-IV.E. OWNER RESPONSIBILITIES UNDER THE HAP CONTRACT
[24 CFR 983.210]
When the owner executes the HAP contract, they certify that at such execution and at all times during the term of the HAP contract:
• All contract units are in good condition and the owner is maintaining the premises and contract units in accordance with NSPIRE standards;
• The owner is providing all services, maintenance, equipment, and utilities as agreed to under the HAP contract and the leases;
• Each contract unit for which the owner is receiving HAP is leased to an eligible family referred by the PHA, and the lease is in accordance with the HAP contract and HUD requirements;
• To the best of the owner’s knowledge, the family resides in the contract unit for which the owner is receiving HAP, and the unit is the family’s only residence; • The owner (including a principal or other interested party) is not the spouse, parent, child, grandparent, grandchild, sister, or brother of any member of a family residing in a contract unit;
• The amount of the HAP the owner is receiving is correct under the HAP contract; • The rent for contract units does not exceed rents charged by the owner for comparable unassisted units;
• Except for HAP and tenant rent, the owner has not received and will not receive any other payment or consideration for rental of the contract unit; • The family does not own or have any interest in the contract unit (this does not apply to the family’s membership in a cooperative); and
• Repair work on the project selected as an existing project that is performed after HAP contract execution within such post-execution period as specified by HUD may constitute development activity, and if determined to be development activity, the repair work undertaken shall be in compliance with Davis-Bacon wage requirements. 18-IV.F. VACANCY PAYMENTS [24 CFR 983.352(b)]
At the discretion of the PHA, the HAP contract may provide for vacancy payments to the owner for a PHA-determined period of vacancy extending from the beginning of the first calendar month after the move-out month for a period not exceeding two full months following the moveout month. The amount of the vacancy payment will be determined by the PHA and cannot exceed the monthly rent to owner under the assisted lease, minus any portion of the rental payment received by the owner, including amounts available from the tenant’s security deposit.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

PART V: SELECTION OF PBV PROGRAM PARTICIPANTS
18-V.A. OVERVIEW
Many of the provisions of the tenant-based voucher regulations [24 CFR 982] also apply to the PBV program. This includes requirements related to determining eligibility and selecting applicants from the waiting list. Even with these similarities, there are requirements that are unique to the PBV program. This part describes the requirements and policies related to eligibility and admission to the PBV program.
18-V.B. PROHIBITED RESCREENING OF EXISTING TENANTS UPON CONVERSION [Notice PIH 2019-23]
Current households cannot be excluded from occupancy at the covered project based on any rescreening, income eligibility, or income targeting provisions. Consequently, current households will be grandfathered for application of any eligibility criteria to conditions that occurred prior to conversion but will be subject to any ongoing eligibility requirements for actions that occur after conversion. Post-conversion, the tenure of all residents of the covered project is protected pursuant to PBV requirements regarding continued occupancy unless explicitly modified by Notice PIH 2019-23 (e.g., rent phase-in provisions). For example, a unit with a household that was over-income at time of conversion would continue to be treated as an assisted unit. Thus, 24 CFR 982.201, concerning eligibility and targeting, will not apply for current households. Once that remaining household moves out, the unit must be leased to an eligible family. Existing residents at the time of conversion may not be rescreened for citizenship status or have their social security numbers reverified.

Further, so as to facilitate the right to return to the assisted property, this provision must apply to current public housing residents of the converting project that will reside in non-RAD PBV units placed in a project that contain RAD PBV units. Such families and such contract units will otherwise be subject to all requirements of the applicable program, specifically 24 CFR 983 for non-RAD PBV. Any non-RAD PBV units located in the same project are also subject to the right to return.

For the RAD PBV program, in-place family means a family who lived in a pre-conversion property at the time assistance was converted from public housing to PBV under RAD.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-V.C. ELIGIBILITY FOR PBV ASSISTANCE [24 CFR 983.251(a) and (b)] Applicants for PBV assistance must meet the same eligibility requirements as applicants for the tenant-based voucher program. Applicants must qualify as a family as defined by HUD and the PHA, have income at or below HUD-specified income limits, and qualify on the basis of citizenship or the eligible immigration status of family members [24 CFR 982.201(a) and 24 CFR 983.2(a)], and meet asset limitation requirements. In addition, an applicant family must provide social security information for family members [24 CFR 5.216 and 5.218] and consent to the PHA’s collection and use of family information regarding income, expenses, and family composition [24 CFR 5.230]. The PHA may also not approve a tenancy if the owner (including a principal or other interested party) of the unit is the parent, child, grandparent, grandchild, sister, or brother of any member of the family, unless needed as a reasonable accommodation. An applicant family must also meet HUD requirements related to current or past criminal activity.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-V.D. ORGANIZATION OF THE WAITING LIST [24 CFR 983.251(c); Notice PIH 2019-23]
The standard PBV regulations at 24 CFR 983.251 set out program requirements related to establishing and maintaining a voucher-wide, PBV program-wide, or site-based waiting list from which residents will be admitted. These provisions will apply unless the project is covered by a remedial order or agreement that specifies the type of waiting list and other waiting list policies.

Any non-RAD PBV units located in the same project are also subject to these requirements.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-V.E. SELECTION FROM THE WAITING LIST [24 CFR 983.251(c)] After conversion to RAD PBV, applicants who will occupy units with RAD PBV assistance must be selected from the PHA’s waiting list. The PHA may establish selection criteria or preferences for occupancy of particular PBV units.

Income Targeting [24 CFR 983.251(c)(6); Notice PIH 2019-23] At least 75 percent of the families admitted to the PHA’s tenant-based and project-based voucher programs during the PHA fiscal year from the waiting list must be extremely-low income families. The income targeting requirement applies to the total of admissions to both programs.

Families in place at the time of the conversion are exempt from income targeting requirements.

New admissions follow standard PBV requirements. Any non-RAD PBV units located in the same project are also subject to these requirements.

Units with Accessibility Features [24 CFR 983.251(c)(7)] When selecting families to occupy PBV units that have special accessibility features for persons with disabilities, the PHA must first refer families who require such features to the owner.

Preferences [24 CFR 983.251(d); FR Notice 11/24/08; Notice PIH 2019-23] The PHA may use the same selection preferences that are used for the tenant-based voucher program, establish selection criteria or preferences for the PBV program as a whole, or for occupancy of particular PBV developments or units.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-V.F. OFFER OF PBV ASSISTANCE
Refusal of Offer [24 CFR 983.251(e)(3)]
The PHA is prohibited from taking any of the following actions against a family who has applied for, received, or refused an offer of PBV assistance:
• Refusing to list the applicant on the waiting list for tenant-based voucher assistance • Denying any admission preference for which the applicant qualifies • Changing the applicant’s place on the waiting list based on preference, date, and time of application, or other factors affecting selection under the PHA’s selection policy • Removing the applicant from the tenant-based voucher waiting list Disapproval by Landlord [24 CFR 983.251(e)(2)]
If a PBV owner rejects a family for admission to the owner’s units, such rejection may not affect the family’s position on the tenant-based voucher waiting list.

Acceptance of Offer [24 CFR 983.252]
Family Briefing
When a family accepts an offer for PBV assistance, the PHA must give the family an oral briefing. The briefing must include information on how the program works and the responsibilities of the family and owner. In addition to the oral briefing, the PHA must provide a briefing packet that explains how the PHA determines the total tenant payment for a family, the family obligations under the program, and applicable fair housing information.

Persons with Disabilities
If an applicant family’s head or spouse is disabled, the PHA must assure effective communication, in accordance with 24 CFR 8.6, in conducting the oral briefing and in providing the written information packet. This may include making alternative formats available (see Chapter 2). In addition, the PHA must have a mechanism for referring a family that includes a member with a mobility impairment to an appropriate accessible PBV unit.

Persons with Limited English Proficiency
The PHA should take reasonable steps to assure meaningful access by persons with limited English proficiency in accordance with Title VI of the Civil Rights Act of 1964 and Executive Order 13166 (see Chapter 2).

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-V.G. OWNER SELECTION OF TENANTS [24 CFR 983.253]
The owner is responsible for developing written tenant selection procedures that are consistent with the purpose of improving housing opportunities for very low-income families and reasonably related to program eligibility and an applicant’s ability to fulfill their obligations under the lease. An owner must promptly notify in writing any rejected applicant of the grounds for any rejection.

Leasing [24 CFR 983.253(a)]
During the term of the HAP contract, the owner must lease contract units to eligible families that are selected and referred by the PHA from the PHA’s waiting list. The contract unit leased to the family must be the appropriate size unit for the size of the family, based on the PHA’s subsidy standards.

Filling Vacancies [24 CFR 983.254(a)]
The owner must promptly notify the PHA of any vacancy or expected vacancy in a contract unit.

After receiving such notice, the PHA must make every reasonable effort to promptly refer a sufficient number of families for the owner to fill such vacancies. The PHA and the owner must make reasonable efforts to minimize the likelihood and length of any vacancy.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-V.H. TENANT SCREENING [24 CFR 983.255]
PHA Responsibility
The PHA is not responsible or liable to the owner or any other person for the family’s behavior or suitability for tenancy. However, the PHA may opt to screen applicants for family behavior or suitability for tenancy and may deny applicants based on such screening.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

The PHA must provide the owner with an applicant family’s current and prior address (as shown in PHA records) and the name and address (if known by the PHA) of the family’s current landlord and any prior landlords.

In addition, the PHA may offer the owner other information the PHA may have about a family, including information about the tenancy history of family members or about drug trafficking and criminal activity by family members. The PHA must provide applicant families a description of the PHA policy on providing information to owners, and the PHA must give the same types of information to all owners.

The PHA may not disclose to the owner any confidential information provided in response to a request for documentation of domestic violence, dating violence, sexual assault, stalking, or human trafficking except at the written request or with the written consent of the individual providing the documentation [24 CFR 5.2007(c)].

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Owner Responsibility
The owner is responsible for screening and selection of the family to occupy the owner’s unit.

When screening families the owner may consider a family’s background with respect to the following factors:
• Payment of rent and utility bills
• Caring for a unit and premises
• Respecting the rights of other residents to the peaceful enjoyment of their housing • Drug-related criminal activity or other criminal activity that is a threat to the health, safety, or property of others
• Compliance with other essential conditions of tenancy Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

PART VI: OCCUPANCY
18-VI.A. OVERVIEW
After an applicant has been selected from the waiting list, determined eligible by the PHA, referred to an owner, and determined suitable by the owner, the family will sign the lease and occupancy of the unit will begin.
18-VI.B. LEASE [24 CFR 983.256]
The tenant must have legal capacity to enter into a lease under state and local law. Legal capacity means that the tenant is bound by the terms of the lease and may enforce the terms of the lease against the owner.

The tenant and the owner must enter into a written lease agreement that is signed by both parties.

The tenancy addendum must include, word-for-word, all provisions required by HUD.

Lease Requirements [24 CFR 983.256(c); Notice PIH 2019-23] The lease for a PBV unit must specify all of the following information:
• The names of the owner and the tenant;
• The unit rented (address, apartment number, if any, and any other information needed to identify the leased contract unit);
• The term of the lease (initial term and any provision for renewal); • The amount of the tenant rent to owner, which is subject to change during the term of the lease in accordance with HUD requirements;
• A specification of the services, maintenance, equipment, and utilities that will be provided by the owner;
• The amount of any charges for food, furniture, or supportive services; and • For any family admitted following conversion, the lease must specify what will happen if the family elects to remain in its unit after increasing its income such that it requires zero HAP.

Specifically, the lease must make clear how the tenant rent will be calculated, and it must address the transition to a new lease. The PHA must include resident procedural rights for termination notification and grievance procedures in the owner’s lease. These requirements are not part of the regular PBV program but are required under RAD.

Tenancy Addendum [24 CFR 983.256(d)]
The tenancy addendum in the lease must state:
• The program tenancy requirements
• The composition of the household as approved by the PHA (the names of family members and any PHA-approved live-in aide)
All provisions in the HUD-required tenancy addendum must be included in the lease. The terms of the tenancy addendum prevail over other provisions of the lease.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

Initial Term and Lease Renewal [24 CFR 983.256(f); RAD PBV Quick Reference Guide 6/20]
Leases for residents who will remain in place (i.e., who will not be relocated solely as a result of conversion) must have an effective date that coincides with—and must be signed on or before— the effective date of the RAD PBV HAP contract.

The initial lease term must be for at least one year. The lease must provide for automatic renewal after the initial term of the lease in either successive definitive terms (e.g., month-to-month or year-to-year) or an automatic indefinite extension of the lease term. For automatic indefinite extension of the lease term, the lease terminates if any of the following occur:
• The owner terminates the lease for good cause
• The tenant terminates the lease
• The owner and tenant agree to terminate the lease
• The PHA terminates the HAP contract
• The PHA terminates assistance for the family
Changes in the Lease [24 CFR 983.256(e)]
If the tenant and owner agree to any change in the lease, the change must be in writing, and the owner must immediately give the PHA a copy of all changes.

The owner must notify the PHA in advance of any proposed change in the lease regarding the allocation of tenant and owner responsibilities for utilities. Such changes may only be made if approved by the PHA and in accordance with the terms of the lease relating to its amendment.

The PHA must redetermine reasonable rent, in accordance with program requirements, based on any change in the allocation of the responsibility for utilities between the owner and the tenant.

The redetermined reasonable rent will be used in calculation of the rent to owner from the effective date of the change.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

Owner Termination of Tenancy [24 CFR 983.257; Notice PIH 2019-23] With two exceptions, the owner of a PBV unit may terminate tenancy for the same reasons an owner may in the tenant-based voucher program (see Section 12-III.B. and 24 CFR 982.310). In the PBV program, terminating tenancy for “good cause” does not include doing so for a business or economic reason, or a desire to use the unit for personal or family use or other non-residential purpose.

Projects converting from public housing to PBV under RAD have additional procedural rights that do not apply to the standard PBV program. These procedural rights must be included in the owner’s lease as well as the PHA’s administrative plan. In addition to the regulations at 24 CFR 983.257 related to project owner termination of tenancy and eviction (which MTW agencies may not alter) the termination procedure for RAD conversions to PBV will require that PHAs provide adequate written notice of termination of the lease, which may not be less than:
• A reasonable period of time, but not to exceed 30 days:
- If the health or safety of other tenants, PHA employees, or persons residing in the immediate vicinity of the premises is threatened; or
- In the event of any drug-related or violent criminal activity or any felony conviction • Not less than 14 days in the case of nonpayment of rent • Not less than 30 days in any other case, except that if a state or local law provides for a shorter period of time, such shorter period will apply
These provisions apply to non-RAD PBV units located in the project as well.

Tenant Absence from the Unit [24 CFR 983.256(g) and 982.312(a)] The lease may specify a maximum period of family absence from the unit that may be shorter than the maximum period permitted by PHA policy. According to program requirements, the family’s assistance must be terminated if they are absent from the unit for more than 180 consecutive days. PHA termination of assistance actions due to family absence from the unit are subject to 24 CFR 982.312, except that the unit is not terminated from the HAP contract if the family is absent for longer than the maximum period permitted.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

Continuation of Housing Assistance Payments [24 CFR 983.258; Notice PIH 2019-23; Notice PIH 2023-19; RAD PBV Quick Reference Guide 6/20] Pre-Conversion Residents
The unit for a family with a TTP that equals or exceeds the gross rent (which is defined as the contract rent plus any utility allowance for the unit) must be placed on the PBV HAP contract and the family must be admitted to the PBV program. In this case, and until such time as the family’s TTP falls below the gross rent, the family will pay the owner the alternate rent which is defined as the lesser of:
• The family’s TTP minus the utility allowance (subject to any required phase-in); or • The Zero HAP Rent Cap, which is the lower of:
- 110 percent fo the applicable FMR minus the utility allowance; or - In the event the units are subject to more restrictive rent setting requirement under the LIHTC or HOME programs (or other programs approved by HUD on a project-specific basis, the rent to owner set to comply with such requirements.

The family will continue to pay this amount until/if circumstances change, and HAP is paid on their behalf. In other words, assistance may subsequently be reinstated if the tenant becomes eligible for assistance in which case normal PBV rent requirements will apply to the family. In such cases, the resident is still considered a program participant. All of the family obligations and protections under RAD and standard PBV apply to the resident. Likewise, all requirements with respect to the unit, such as compliance with the NSPIRE standards, apply as long as the unit is under HAP contract or added back to the HAP Contract. Any non-RAD PBV units located in the same project are also subject to these requirements.

After a family has paid the Zero HAP Rent Cap for a period of 180 days, the PHA must remove the unit from the HAP Contract and the family’s participating in the PBV program ends. If the Covered Project is fully assisted and the family subsequently leaves the property, the PHA must reinstate the unit back onto the HAP contract and admit an eligible family. If the Covered Project is partially assisted and the family subsequently leaves the property, the unit must be reinstated back onto the HAP contract unless the PHA previously substituted a different unit on the HAP contract in accordance with 24 CFR § 983.207 or, where “floating units” have been permitted.

Additionally, if the family continues to reside in the project after the family’s unit was removed from the HAP contract, the family may request to return to the PBV program if the family’s income subsequently decreases to the extent that the family’s TTP is less than the Zero-HAP Rent Cap, and the family is otherwise eligible for PBV assistance. The PHA must, at the earliest opportunity, reinstate the family’s unit back onto the HAP contract to provide rental assistance to the family. If the project was partially assisted and the PHA previously substituted a different unit on the HAP contract, the PHA must substitute the family’s unit for a vacant unit on the HAP contract if there is a vacant unit at the time of the request, or by doing so as soon as a unit on the HAP contract becomes vacant if there are no vacant units on the HAP contract at the time of the family request
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

New Admission Families
Unless a waiver is requested and approved, following conversion, 24 CFR 983.53(d) applies, and any new admission referred to the RAD PBV project must be initially eligible for a HAP payment at admission to the program. This means a family’s TTP may not equal or exceed the gross rent for the unit at admission. The PHA may request a waiver from HUD in order to admit otherwise eligible families whose TTP exceeds gross rent and to allow the units those families occupy to remain under the HAP contract even if the PHA has not paid HAP for the family in 180 days.

Further, for any new families admitted after the conversion, assistance will be terminated 180 days after the last housing assistance payment on their behalf. The cessation of housing assistance payments does not affect the family’s other rights under its lease, nor does it preclude the resumption of payments as a result of later changes in income, rents, or other relevant circumstances if such changes occur within the 180-day window. If a family’s assistance is terminated as a result of their zero HAP status, the PHA must remove the unit from the HAP contract. If the project is fully assisted and the family subsequently leaves the property, the PHA must reinstate the unit after the family has vacated the property and admit an eligible family. If the project is partially assisted, the PHA may substitute a different unit for the unit on the HAP contract in accordance with 24 CFR 983.207 or where floating units have been permitted.

Per the RAD Use Agreement, the owner may charge the family a rent that does not exceed 30 percent of 80 percent of the area median income. If a unit is removed from the RAD PBV HAP contract, then the lease terminates automatically, as stated in the tenancy addendum, as though the RAD PBV HAP contract had been terminated. The tenant must be offered a new lease, which must reflect the new tenant rent. A tenant in this circumstance is no longer a program participant and therefore no longer benefits from any of the rights or protections specific to RAD, or to the PBV program. Should the family subsequently lose employment, the owner may choose to reduce the family’s rent, but if the family wishes to be admitted to the HCV/PBV program, then it must be admitted through the waiting list like any other applicant.

In circumstances where low RAD PBV rents may prohibit a significant number of otherwise eligible families on the waiting list from being admitted to the project because they do not require subsidy, and which could consequently create an undue concentration of poverty at the project compared to non-RAD PBV projects, a PHA may request a waiver from HUD for the covered project. The waiver will apply the alternative requirements applicable to the preconversion residents to new admission families.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

Security Deposits [24 CFR 983.259; RAD PBV Quick Reference Guide 6/20] Owners are permitted to recognize security deposit amounts that have been previously provided by tenants who are in-place at the time of the RAD conversion. If a tenant residing in a converting project has not previously provided a security deposit, then the owner may collect a security deposit at the time of initial lease execution. Otherwise, the security deposit requirements for standard PBV apply.

The owner may collect a security deposit from the tenant. The PHA may prohibit security deposits in excess of private market practice, or in excess of amounts charged by the owner to unassisted tenants.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

When the tenant moves out of a contract unit, the owner, subject to state and local law, may use the security deposit, including any interest on the deposit, in accordance with the lease, as reimbursement for any unpaid tenant rent, damages to the unit, or other amounts owed by the tenant under the lease.

The owner must give the tenant a written list of all items charged against the security deposit and the amount of each item. After deducting the amount used to reimburse the owner, the owner must promptly refund the full amount of the balance to the tenant.

If the security deposit does not cover the amount owed by the tenant under the lease, the owner may seek to collect the balance from the tenant. The PHA has no liability or responsibility for payment of any amount owed by the family to the owner.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-VI.C. PUBLIC HOUSING FSS AND ROSS PARTICIPANTS [Notice PIH 2019-23] Current PH FSS participants will continue to participate in the PHA’s FSS program, and PHAs will be allowed to use any PH FSS funds granted previously or pursuant to the current fiscal year (FY) PH FSS notice of funding availability (NOFA) to serve those FSS participants who live in units converted to RAD and who will as a result be moving to the HCV FSS program. A PHA must convert the PH FSS program participants at the covered project to their HCV FSS program.

Residents who were converted from the PH FSS program to the HCV FSS program through RAD may not be terminated from the HCV FSS program or have HCV assistance withheld due to the participant’s failure to comply with the contract of participation. Consequently, 24 CFR 984.303(b)(5)(iii) does not apply to FSS participants in converted properties.

At the completion of the FSS grant, PHAs should follow the normal closeout procedures outlined in the grant agreement. If the PHA continues to run an FSS program that serves PH and/or HCV participants, the PHA will continue to be eligible (subject to NOFA requirements) to apply for FSS funding.

Current Resident Opportunities and Self-Sufficiency–Service Coordinators (ROSS–SC) program grantees will be able to finish out their current ROSS–SC grants once their housing is converted under RAD. However, once the property is converted, it will no longer be eligible to be counted towards the unit count for future public housing ROSS–SC grants.

At the completion of the ROSS-SC grant, PHAs should follow the normal closeout procedures outlined in the grant agreement. Please note that ROSS-SC grantees may be a nonprofit or local resident association and this consequence of a RAD conversion may impact those entities.

Any non-RAD PBV units located in the same project are also subject to these requirements. 18-VI.D. RESIDENT PARTICIPATION AND FUNDING [Notice PIH 2019-23] Residents of covered projects converting assistance to PBVs will have the right to establish and operate a resident organization for the purpose of addressing issues related to their living environment and be eligible for resident participation funding.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-VI.E. MOVES
Overcrowded, Under-Occupied, and Accessible Units [24 CFR 983.260; Notice PIH 2019-23]
All in-place tenants at the time of conversion are eligible to remain in the project. Over-housed families should be moved into appropriately sized units if such units are available in the new or rehabbed project. If appropriately sized units are not available, the existing tenants may continue to be over-housed until an appropriately sized unit becomes available or until the tenant leaves the project. Once the unit turns over, it must be leased to an appropriately sized family. Any nonRAD PBV units located in the same project are also subject to these requirements.

Following conversion, the standard PBV regulations apply. If the PHA determines that a family is occupying a wrong-size unit, based on the PHA’s subsidy standards, or a unit with accessibility features that the family does not require, and the unit is needed by a family that does require the features, the PHA must promptly notify the family and the owner of this determination, and the PHA must offer the family the opportunity to receive continued housing assistance in another unit.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

If the PHA offers the family another form of assistance that is not a tenant-based voucher, and the family does not accept the offer, does not move out of the PBV unit within a reasonable time as determined by the PHA, or both, the PHA must terminate the housing assistance payments for the unit at the expiration of a reasonable period as determined by the PHA and remove the unit from the HAP contract.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Family Right to Move [24 CFR 983.261]
The family may terminate the lease at any time after the first year of occupancy. The family must give advance written notice to the owner in accordance with the lease and provide a copy of such notice to the PHA.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

Choice Mobility [Notice PIH 2019-23; PRRAC Choice Mobility Implementation Guidance, 8/20]
Family’s Right to Choice Mobility
Under RAD PBV, the choice mobility option provides families with the opportunity to move with continued assistance any time after 12 months of occupancy. All residents in converted properties should be aware of their housing mobility rights and of their options in a range of neighborhoods.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Moving with Continued Assistance under Choice Mobility
If the family wishes to move with continued tenant-based assistance under choice mobility, the family must contact the PHA to request the rental assistance prior to providing notice to terminate the lease. If the family terminates the lease in accordance with lease requirements, the PHA is required to offer the family the opportunity for continued tenant-based assistance, in the form of a voucher or other comparable tenant-based rental assistance. If a voucher or other comparable tenant-based assistance is not immediately available, the PHA must give the family priority to receive the next available opportunity for continued tenant-based assistance.

Families are eligible to move with continued assistance under choice mobility after 12 months of occupancy. If the family terminates the assisted lease before the end of the first year, the family relinquishes the opportunity for continued tenant-based assistance.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Turnover Cap
If as a result of RAD, the total number of PBV units (including RAD PBV units) administered by the PHA exceeds 20 percent of the PHA’s authorized units under its HCV ACC with HUD, the PHA may establish a turnover cap. The PHA is not required to provide more than three-quarters of its turnover vouchers in any single year to the residents of covered projects. If the PHA chooses to establish a turnover cap and the cap is implemented, the PHA must create and maintain a waiting list in the order requests from eligible households were received.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

Emergency Transfers under VAWA [Notice PIH 2017-08]
Except where special consideration is needed for the project-based voucher program, the PHA will follow VAWA policies as outlined in Chapter 16 Part IX of this administrative plan, including using the Emergency Transfer Plan as the basis for PBV transfers under VAWA (Exhibit 16-4).

HUD requires that the PHA include policies that address when a victim has been living in a unit for less than a year or when a victim seeks to move sooner than a tenant-based voucher is available.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-VI.F. REEXAMINATIONS [RAD PBV Quick Reference Guide 6/20] A family living in a unit converted from public housing to RAD PBV may retain its certification date. Unless a family’s annual reexamination is due at the same time as the effective date of the RAD PBV HAP contract, the PHA does not need to recertify tenants at the point of conversion.

For each family residing in a unit undergoing conversion of assistance under RAD, the administering PHA will have to submit a form HUD-50058 reflecting the family’s admission to the voucher program. The effective date of the new admission will be the same as the effective date of the RAD PBV HAP contract. The form should include the same information previously found on the public housing form 50058, including the next annual reexamination date. 18-VI.G. EARNED INCOME DISALLOWANCE [Notice PIH 2019-23] Tenants who are employed and are currently receiving the EID exclusion at the time of conversion will continue to receive the EID after conversion, in accordance with regulations at 24 CFR 5.617. Upon the expiration of the EID for such families, the rent adjustment will not be subject to rent phase-in; instead, the rent will automatically rise to the appropriate rent level based upon tenant income at that time. Any non-RAD PBV units located in the same project are also subject to these requirements.

Under the HCV program, the EID exclusion is limited to only persons with disabilities [24 CFR

5.617(b)]. In order to allow all tenants (including non-disabled persons) who are employed and currently receiving the EID at the time of conversion to continue to benefit from this exclusion in the PBV project, the provision in section 5.617(b) limiting EID to only persons with disabilities is waived. The waiver and resulting alternative requirement only applies to tenants receiving the EID at the time of conversion. No other tenant, such as tenants who at one time received the EID but are not receiving the EID exclusion at the time of conversion (e.g., due to loss of employment), tenants that move into the property following conversion, etc., is covered by this waiver.
18-VI.H. RESIDENTS’ PROCEDURAL RIGHTS [Notice PIH 2019-23] HUD is incorporating additional termination notification requirements for public housing projects that convert assistance under RAD to PBV and to non-RAD PBV units located in the same project beyond those for the standard PBV program. In addition to the regulations at 24 CFR 983.257 related to owner termination of tenancy and eviction (which MTW agencies may not alter), the termination procedure for RAD conversions to PBV requires that PHAs provide adequate written notice of termination of the lease, which is:
• A reasonable period of time, but not to exceed 30 days:
- If the health or safety of other tenants, project owner employees, or persons residing in the immediate vicinity of the premises is threatened; or - In the event of any drug-related or violent criminal activity or any felony conviction. • Not less than 14 days in the case of nonpayment of rent • Not less than 30 days in any other case, except that if a state or local law provides for a shorter period of time, such shorter period will apply
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-VI.I. INFORMAL REVIEWS AND HEARINGS [Notice PIH 2019-23] In addition to reasons for an informal hearing listed at 24 CFR 982.555(a)(1)(i)–(v) (See 16-III.C. Informal Hearings for Participants), an opportunity for an informal hearing must be given to residents for any dispute that a resident may have with respect to an owner action in accordance with the individual’s lease or the contract administrator in accordance with RAD PBV requirements that adversely affect the resident’s rights, obligations, welfare, or status. • For any hearing required under 24 CFR 982.555(a)(1)(i)–(v), the contract administrator will perform the hearing in accordance with Chapter 16 Part III: Informal Reviews and Hearings, as is the current standard in the program.
• For any additional hearings required under RAD, the PHA (as owner) will perform the hearing.

An informal hearing will not be required for class grievances or for disputes between residents not involving the PHA (as owner) or contract administrator. This hearing requirement does not apply to and is not intended as a forum for initiating or negotiating policy changes between a group or groups of residents and the PHA (as owner) or contract administrator.

The owner must give residents notice of their ability to request an informal hearing as outlined in 24 CFR 982.555(c)(1) for informal hearings that will address circumstances that fall outside of the scope of 24 CFR 982.555(a)(1)(i)–(v). (See Chapter 16) The owner must provide an opportunity for an informal hearing before an eviction.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

PART VII: DETERMINING CONTRACT RENT
18-VII.A. INITIAL CONTRACT RENTS [Notice PIH 2019-23]
RAD conversions are intended to be cost-neutral, and therefore, should not exceed current public housing funding as adjusted for unit size. Since public housing units do not currently have contract rents, HUD provides an estimate of current contract rents for each PHA’s public housing units based on current funding as adjusted by bedroom size. Current funding includes operating subsidy, tenant rents, capital funds, replacement housing factor funds (RHF), and demolition disposition transitional funding (DDTF). The funding may limit the amount of initial rent for a property. A detailed explanation of the determination of current funding may be found in Attachment 1C of Notice PIH 2019-23. Once the current funding amount is calculated, the amount is adjusted by bedroom size to determine the current funding rent. HUD uses the same bedroom adjustment factors as in the metropolitan FMR schedules where the project is located.

PHAs may adjust subsidy (and contract rents) across multiple projects as long as the PHA does not exceed the aggregate subsidy for all of the projects the PHA has submitted for conversion under RAD.

Notwithstanding HUD’s calculation of the initial contract rent based on the project’s subsidy under the public housing program and any modifications made to the initial contact rent, the initial rents are set at the lower of:
• An amount determined by the PHA, not to exceed 110 percent of the fair market rent (FMR) or the PHA’s exception payment standard approved by HUD, or the alternate rent cap in a PHA’s MTW agreement minus any utility allowance
• The reasonable rent
• The rent requested by the owner
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-VII.B. ADJUSTING CONTRACT RENTS [Notice PIH 2019-23; RAD PBV Quick Reference Guide 6/20; PHA Asset Repositioning “How to Apply OCAF for RAD PBV” Webinar]
RAD PBV contract rents are adjusted differently than contract rents in the standard PBV program. At each annual anniversary of the HAP contract, contract rents will be adjusted only by HUD’s operating cost adjustment factor (OCAF) that is applied to the current contract rent, less the portion of the rent paid for debt service, subject to the availability of appropriations for each year of the contract term. As such, section 8(o)(13)(I) of the 1937 Act, and 24 CFR 983.301 and 983.302, concerning rent determinations, do not apply when adjusting rents. The rent to owner may at no time exceed the reasonable rent charged for comparable unassisted units in the private market, as determined by the contract administrator in accordance with 24 CFR 983.303.

Contract rents may not exceed the reasonable rent (as determined by the PHA that administers the contract or the independent entity, as applicable), with the exception that the contract rent for each unit may not be reduced below the initial contract rent under the initial HAP contract.

However, the rent to owner may fall below the initial contract rent in the following situations:
• To correct errors in calculations in accordance with HUD requirements • If additional housing assistance has been combined with PBV assistance after the execution of the initial HAP contract and a rent decrease is required pursuant to 983.55 (prohibition of excess public assistance)
• If a decrease in rent to owner is required based on changes in the allocation of responsibility for utilities between the owner and the tenant
The contract rent adjustment will be the lesser of:
• The current contract rent increased by the operating cost adjustment factor (OCAF), which is published annually in the Federal Register; or
• The reasonable rent
The administering PHA (or independent entity, if the project is PHA-owned) is responsible for processing rent adjustments at each contract anniversary date in accordance with the prevailing OCAF. The PHA who administers the contract (directly or via an independent entity) must maintain records to demonstrate how OCAF amounts were determined and how rent adjustments were calculated. HUD approval of rent adjustments is not required.

Properties are eligible to receive prior years’ OCAF adjustments for years in which the OCAF was not taken. The OCAF must be applied retroactively if it was missed. The PHA administering the contract (or the independent entity) must make sure that all OCAFs have been applied correctly since the RAD closing and calculate the current rents accordingly, including making sure that the RAD PBV contract rents do not exceed the PBV program caps.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Rent Decrease
Rents must not be reduced below the initial rent except to correct errors, for additional subsidy to the property, or to realign utility responsibilities.
18-VII.C. UTILITY ALLOWANCES [Notice PIH 2019-23; RAD PBV Quick Reference Guide 6/20]
When contract rent amounts are set initially, the amount does not include a utility allowance. In general, the utility allowances that are used on the initial HAP contract at closing are the public housing utility allowances that are in effect prior to conversion. The CHAP must be updated prior to conversion to reflect current public housing utility allowances. At its discretion, a PHA may use the FMRs and utility allowances in effect during the 30-day period immediately before the beginning date of the HAP contract.

After conversion, the PHA that administers the contract must maintain the utility allowance schedule. The PHA may either maintain a utility allowance schedule for tenant-paid utilities in accordance with standard PBV and HCV utility allowance regulations at 24 CFR 983.301(f)(2)(ii) and 24 CFR 982.517, respectively, or the PHA may instead apply site-specific utility allowances. HUD waived the requirement for the standard PBV program that the HCV utility allowance be used. If a site-specific utility allowance is used, the utility allowance is applicable to non-RAD PBV units in the project and is calculated consistent with Notice H 2015-04.

Each family transitions to the new utility allowance at their first recertification following conversion.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-VII.D. REASONABLE RENT [24 CFR 983.303]
At the time the initial rent is established and all times during the term of the HAP contract, the rent to owner for a contract unit may not exceed the reasonable rent for the unit as determined by the PHA, except rents must not be reduced below the initial rent except to correct errors, for additional subsidy to the property, or to realign utility responsibilities.

How to Determine Reasonable Rent
The reasonable rent of a unit receiving PBV assistance must be determined by comparison to rent for other comparable unassisted units. When making this determination, the PHA must consider factors that affect market rent. Such factors include the location, quality, size, type and age of the unit, as well as the amenities, housing services maintenance, and utilities to be provided by the owner.

Comparability Analysis
For each unit, the comparability analysis must use at least three comparable units in the private unassisted market. This may include units in the premises or project that is receiving projectbased assistance. The analysis must show how the reasonable rent was determined, including major differences between the contract units and comparable unassisted units, and must be retained by the PHA. The comparability analysis may be performed by PHA staff or by another qualified person or entity. Those who conduct these analyses or are involved in determining the housing assistance payment based on the analyses may not have any direct or indirect interest in the property.

PHA-Owned Units
For PHA-owned units, the amount of the reasonable rent must be determined by an independent entity approved by HUD in accordance with PBV program requirements. The independent entity must provide a copy of the determination of reasonable rent for PHA-owned units to the PHA and to the HUD field office where the project is located.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

PART VIII: PAYMENTS TO OWNER
18-VIII.A. HOUSING ASSISTANCE PAYMENTS
During the term of the HAP contract, the PHA must make housing assistance payments to the owner in accordance with the terms of the HAP contract. During the term of the HAP contract, payments must be made for each month that a contract unit complies with NSPIRE and is leased to and occupied by an eligible family. The housing assistance payment must be paid to the owner on or about the first day of the month for which payment is due, unless the owner and the PHA agree on a later date.

Except for discretionary vacancy payments, the PHA may not make any housing assistance payment to the owner for any month after the month when the family moves out of the unit (even if household goods or property are left in the unit).

The amount of the housing assistance payment by the PHA is the rent to owner minus the tenant rent (total tenant payment minus the utility allowance).

In order to receive housing assistance payments, the owner must comply with all provisions of the HAP contract. Unless the owner complies with all provisions of the HAP contract, the owner does not have a right to receive housing assistance payments.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-VIII.B. VACANCY PAYMENTS [24 CFR 983.352]
If an assisted family moves out of the unit, the owner may keep the housing assistance payment for the calendar month when the family moves out. However, the owner may not keep the payment if the PHA determines that the vacancy is the owner’s fault.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

At the discretion of the PHA, the HAP contract may provide for vacancy payments to the owner.

The PHA may only make vacancy payments if:
• The owner gives the PHA prompt, written notice certifying that the family has vacated the unit and identifies the date when the family moved out (to the best of the owner’s knowledge);
• The owner certifies that the vacancy is not the fault of the owner and that the unit was vacant during the period for which payment is claimed;
• The owner certifies that it has taken every reasonable action to minimize the likelihood and length of vacancy; and
• The owner provides any additional information required and requested by the PHA to verify that the owner is entitled to the vacancy payment.

The owner must submit a request for vacancy payments in the form and manner required by the PHA and must provide any information or substantiation required by the PHA to determine the amount of any vacancy payment.

HACN Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-VIII.C. TENANT RENT TO OWNER [24 CFR 983.353; Notice PIH 2019-23] The tenant rent is the portion of the rent to owner paid by the family. The amount of tenant rent is determined by the PHA in accordance with HUD requirements. Any changes in the amount of tenant rent will be effective on the date stated in the PHA notice to the family and owner.

The family is responsible for paying the tenant rent (total tenant payment minus the utility allowance). The amount of the tenant rent determined by the PHA is the maximum amount the owner may charge the family for rental of a contract unit. The tenant rent covers all housing services, maintenance, equipment, and utilities to be provided by the owner. The owner may not demand or accept any rent payment from the tenant in excess of the tenant rent as determined by the PHA. The owner must immediately return any excess payment to the tenant.

Initial Certifications [Notice PIH 2019-23]
For the initial certification, the PHA will use the family’s public housing tenant rent (reflected on line 10f of the family’s most recent 50058) at the date of conversion to calculate HAP and tenant rent for the PBV program. The PHA will use this amount until the effective date of the earlier of the family’s first regular or interim recertification following the conversion. At that point, the PHA will use the family’s TTP based on the recertification and the applicable utility allowance (HCV or RAD PBV site-based, as applicable) to determine PBV HAP and tenant rent. Any nonRAD PBV units located in the same project are subject to the same requirements.

Tenant and PHA Responsibilities
The family is not responsible for the portion of rent to owner that is covered by the housing assistance payment and the owner may not terminate the tenancy of an assisted family for nonpayment by the PHA.

Likewise, the PHA is responsible only for making the housing assistance payment to the owner in accordance with the HAP contract. The PHA is not responsible for paying tenant rent, or any other claim by the owner, including damage to the unit. The PHA may not use housing assistance payments or other program funds (including administrative fee reserves) to pay any part of the tenant rent or other claim by the owner.

Utility Reimbursements
If the amount of the utility allowance exceeds the total tenant payment, the PHA must pay the amount of such excess to the tenant as a reimbursement for tenant-paid utilities, and the tenant rent to the owner must be zero.

The PHA may pay the utility reimbursement directly to the family or to the utility supplier on behalf of the family. If the PHA chooses to pay the utility supplier directly, the PHA must notify the family of the amount paid to the utility supplier.

PHA Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18-VIII.D. PHASE-IN OF TENANT RENT INCREASES [Notice PIH 2019-23; PHA Asset Repositioning “Phase-in of Tenant Rents” Webinar]
For in-place tenants, if the amount the tenant would pay for rent and utilities (TTP) would increase by more than the greater of 10 percent or $25 purely as a result of conversion, the rent increase will be phased in over three years. To implement this provision, HUD is waiving section 3(a)(1) of the 1937 Act, as well as 24 CFR 983.3 (definition of total tenant payment (TTP)) only to the extent necessary to allow for the phase-in of tenant rent increases. For families who were on EID at the time of conversion to RAD PBV, upon the expiration of the EID, the rent adjustment is not subject to rent phase-in.

The PHA must communicate this policy in writing to affected residents. Any non-RAD PBV units located in the same covered project are subject to the terms of the phase-in provisions.

PHA Policy
This section is not applicable to HACN as PHA will not operate project based vouchers under the rental assistance demonstration program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

18.VIII.E. OTHER FEES AND CHARGES [24 CFR 983.354]
Meals and Supportive Services
With the exception of PBV assistance in assisted living developments, the owner may not require the tenant to pay charges for meals or supportive services. Non-payment of such charges is not grounds for termination of tenancy.

In assisted living developments receiving PBV assistance, the owner may charge for meals or supportive services. These charges may not be included in the rent to owner, nor may the value of meals and supportive services be included in the calculation of the reasonable rent. However, non-payment of such charges is grounds for termination of the lease by the owner in an assisted living development.

Other Charges by Owner
The owner may not charge extra amounts for items customarily included in rent in the locality or provided at no additional cost to unsubsidized tenants in the premises.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

EXHIBIT 18-1: PBV DEVELOPMENT INFORMATION
(Fill out one for each development)
Date: [Enter the date on which this form was completed]

DEVELOPMENT INFORMATION
Development Name: [Insert name of PBV development]
Address: [Insert full address of PBV development]
Owner Information: [Insert PBV development owner name and contact information. If development is PHA-owned, enter “PHA-owned.”]
Property Management Company: [Insert property management company name and contact information, or enter “None”]
PHA-Owned: [Enter “Yes” or “No.” If yes, enter name of independent entity.] Mixed-Finance Development: [Enter “Yes” or “No.” If yes, list other types of funding and units to which other funding applies.]

HAP CONTRACT
Closing Date: [Enter closing date of RAD conversion]
List Which RAD Notice Applies to the Project: [Enter “PIH 2012-32, REV-2,” “PIH 2012-32, REV-3,” or “PIH 2019-23”]
Effective Date of Contract: [Enter start date of HAP contract] HOTMA Requirements: [If HAP contract was signed prior to April 18, 2017, enter “PreHOTMA.” If HAP contract was signed on or after April 18, 2017, enter “Post-HOTMA.”] Term of HAP Contract: [Enter term from HAP contract]
Expiration Date of Contract: [Enter expiration date from HAP contract]

PBV UNITS
0 BR 1 BR 2 BR 3 BR 4 BR 5 BR Total
# of
Units
Initial
Contract
Rent
$ $ $ $ $ $
Unit Designation: [Enter “Fixed” or “Floating”]
Accessible Units and Features: [Identify which units are accessible and describe accessibility features or enter “None”]
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City od Needles

Page 18 ends

Target Population: [Describe targeted population in accordance with HAP contract or enter “None”]
Excepted Units (Notice PIH 2012-32, REV-2 Developments Only): [Identify excepted unit types below or enter “None”]
Supportive Services: [Enter “Yes, see Exhibit D of HAP contract” or enter “No”] Elderly Units: [Enter “Yes” or “No.” If yes, identify which units are elderly units.] Disabled Units [Enter “Yes” or “No.” If yes, identify which units are for persons with disabilities.]

WAITING LIST AND SELECTION
Waiting List Type: [Enter “Site-based waiting list,” “Combined with HCV,” “Waiting list for entire PBV program,” or “Merged with another assisted housing program”] Preferences: [Enter “Same as HCV; see Chapter 4” or describe preferences offered. If different from HCV, note in Section 18.1.C. of this policy.]
Preference Verification: [Enter “Same as HCV; see Chapter 7” or describe for each preference listed above. If different from HCV, note in Section 18.1.C. of this policy.] For the PBV program, is the income limit the same as the HCV program? (Note: In mixedfinance developments, other income limits may also apply.) [Enter “Same as HCV; see Chapter 3” or clearly describe]

OCCUPANCY
Subsidy Standards: [Enter “Same as HCV; see Chapter 5” or describe. If different from HCV, note in Section 18.1.C. of this policy.]
Utilities: [Enter in accordance with HAP contract Exhibit C] Vacancy Payments: [Enter in accordance with HAP contract Part 1, e, 2 and Section 18-IV.F. within this chapter]
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

Chapter 19

SPECIAL PURPOSE VOUCHERS

INTRODUCTION
Special purpose vouchers are specifically funded by Congress in separate appropriations from regular HCV program funding in order to target specific populations. Special purpose vouchers include vouchers for the following programs:
• Family Unification Program (FUP)
• Foster Youth to Independence (FYI) program
• Veterans Affairs Supportive Housing (VASH)
• Mainstream
• Non-Elderly Disabled (NED)
• Stability Voucher program
PHA Policy
The PHA will administer the following types of special purpose vouchers:

Veterans Affairs Supportive Housing (VASH)
This chapter describes HUD regulations and PHA policies for administering special purpose vouchers. The policies outlined in this chapter are organized into five sections, as follows:

Part I: Family Unification Program (FUP)
Part II: Foster Youth to Independence (FYI) program
Part III: Veterans Affairs Supportive Housing (VASH)
Part IV: Mainstream voucher program
Part V: Non-Elderly Disabled (NED) vouchers
Part VI: Stability Voucher program
Except as addressed by this chapter and as required under federal statute and HUD requirements, the general requirements of the HCV program apply to special purpose vouchers.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

PART I: FAMILY UNIFICATION PROGRAM (FUP)
19-I.A. PROGRAM OVERVIEW [Fact Sheet, Housing Choice Voucher Program Family Unification Program (FUP)]
Overview
The Family Unification Program (FUP) was authorized by Congress in 1990 to help preserve and reunify families. PHAs that administer the program provide vouchers to two different populations—FUP families and FUP youth.

Families eligible for FUP are families for whom the lack of adequate housing is a primary factor in:
• The imminent placement of the family’s child or children in out-of-home care; or • The delay in the discharge of the child or children to the family from out-of-home care.

There is no time limitation on FUP family vouchers, and the family retains their voucher as long as they are HCV-eligible. There is no requirement for the provision of supportive services for FUP family vouchers.

Youth eligible for FUP are those who:
• Are at least 18 years old and not more than 24 years of age; • Have left foster care or will leave foster care within 90 days, in accordance with a transition plan described in section 475(5)(H) of the Social Security Act at age 16 and older; and • Are homeless or at risk of becoming homeless.

FUP youth vouchers are limited by statute to a period between 36 and 60 months of housing assistance. Supportive services must also be provided to FUP-eligible youth by the Public Child Welfare Agency (PCWA) or by another agency or organization under contract with the PCWA for the period of time defined in the notice or Notice of Funding Availability/Opportunity (NOFA/O) for which funding was made available.

PHAs that wish to administer FUP vouchers must apply to HUD by submitting an application under an active Notice of Funding Opportunity (NOFO). While the FUP program is administered in accordance with HCV regulations, the FUP NOFOs issued by HUD provide specific program information and requirements.

In order to administer the program, the PHA must also form a partnership with a local PCWA who is responsible for determining the family or youth meets FUP eligibility requirements and referring them to the PHA. Once the referral is received, the PHA is responsible for placing the FUP family or youth on the PHA’s waiting list and determining whether they are eligible to receive assistance under the PHA’s HCV program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

Assigning Vouchers [FUP FAQs]
The PHA may, but is not required to, assign a specific number or percentage of FUP vouchers for FUP youths and FUP families. Unless the PHA assigns a specific number or percentage of FUP vouchers to a designated FUP population, the PHA must serve any referrals (youths or families) that meet all program eligibility requirements up to the PHA’s designated FUP program size.

HACN Policy
The PHA does not administer Family Unification Program vouchers. 19-I.B. PUBLIC CHILD WELFARE AGENCY (PCWA)
Families and youth do not apply directly to the PHA for FUP vouchers. They are instead referred by a PCWA with whom the PHA has entered into a Memorandum of Understanding (MOU).

The partnering PCWA initially determines whether the family or youth meets the FUP program eligibility requirements listed in 19-I.C. and 19-I.D. and then refers those families or youths to the PHA.

HUD strongly encourages PHAs and PCWAs to make decisions collaboratively on the administration of the program and to maintain open and continuous communication. The PCWA must have a system for identifying FUP-eligible youth within the agency’s caseload and for reviewing referrals from a Continuum of Care (COC) if applicable.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

Supportive Services
The PCWA must provide supportive services for the period of time defined in the notice or NOFA/O for which the funding was made available to all FUP-eligible youth regardless of their age. The MOU between the PHA and the PCWA should identify the period of time in which supportive services will be provided.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Supportive services may be provided to FUP-eligible youth by the PCWA or by another agency or organization under agreement or contract with the PCWA, including the PHA. The organization providing the services and resources must be identified in the MOU. The following services must be offered:
• Basic life skills information or counseling on money management, use of credit, housekeeping, proper nutrition or meal preparation, and access to health care (e.g., doctors, medication, and mental and behavioral health services); • Counseling on compliance with rental lease requirements and with HCV program participant requirements, including assistance or referrals for assistance on security deposits, utility hook-up fees, and utility deposits;
• Providing such assurances to owners of rental property as are reasonable and necessary to assist a FUP-eligible youth to rent a unit with a FUP voucher; • Job preparation and attainment counseling (where to look and how to apply, dress, grooming, relationships with supervisory personnel, etc.); and
• Educational and career advancement counseling regarding attainment of general equivalency diploma (GED), or attendance or financing of education at a technical school, trade school, or college, including successful work ethic and attitude models.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
A FUP-eligible youth cannot be required to participate in these services as condition of receipt of the FUP voucher.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

19-I.C. FUP FAMILY VOUCHER ELIGIBILITY CRITERIA
FUP family assistance is reserved for eligible families that the PCWA has certified are a family for whom a lack of adequate housing is a primary factor in:
• The imminent placement of the family’s child or children in out-of-home care, or • The delay in the discharge of the child or children to the family from out-of-home care.

Lack of adequate housing means the family meets any one of the following conditions:
• Living in substandard housing, which refers to a unit that meets any one of the following conditions:
- Does not have operable indoor plumbing
- Does not have a usable flush toilet inside the unit for the exclusive use of a family or youth
- Does not have a usable bathtub or shower inside the unit for the exclusive use of a family or youth
- Does not have electricity, or has inadequate or unsafe electrical service - Does not have a safe or adequate source of heat
- Should, but does not, have a kitchen
- Has been declared unfit for habitation by an agency or unit of government, or in its present condition otherwise endangers the health, safety, or well-being of the family or youth
- Has one or more critical defects, or a combination of intermediate defects in sufficient number or to the extent that it requires considerable repair or rebuilding. The defects may result from original construction, from continued neglect or lack of repair, or from serious damage to the structure
• Being homeless as defined in 24 CFR 578.3
• Living in a unit where the presence of a household member with certain characteristics (i.e., conviction for certain criminal activities) would result in the imminent placement of the family’s child or children in out-of-home care, or the delay in the discharge of the child or children to the family from out-of-home care
• Living in housing not accessible to the family’s disabled child or children due to the nature of the disability
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

• Living in an overcrowded unit, which is defined as living in a unit where one of the following conditions has been met:
- The family is separated from its child or children and the parents are living in an otherwise standard housing unit, but, after the family is reunited, the parents’ housing unit would be overcrowded for the entire family and would be considered substandard; or - The family is living with its child or children in a unit that is overcrowded for the entire family and this overcrowded condition may result, in addition to other factors, in the imminent placement of its child or children in out-of-home care. - For purposes of this definition, the determination as to whether the unit is overcrowded is made in accordance with the PHA subsidy standards in Chapter 5, Part III of this policy.

Since HUD does not define imminent placement, the partnering PCWA may use its discretion to determine whether the potential out of home placement of the family’s child or children is imminent [FUP FAQs].

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

19-I.D. FUP YOUTH VOUCHER ELIGIBILITY CRITERIA
While FUP family vouchers operate as regular HCVs after the family is referred from the PCWA, there are several aspects of the FUP youth vouchers that make them distinct from the FUP family vouchers and from regular HCVs.

Eligibility Criteria
A FUP-eligible youth is a youth the PCWA has certified:
• Is at least 18 years old and not more than 24 years of age (has not yet reached their 25th birthday);
- The FUP youth must be no more than 24 years old at the time the PCWA certifies them as eligible and at the time of HAP contract execution.
• Has left foster care or will leave foster care within 90 days, in accordance with a transition plan described in section 475(5)(H) of the Social Security Act; - Foster care placement can include, but is not limited to, placements in foster family homes, foster homes of relatives, group homes, emergency shelters, residential facilities, child care institutions, and pre-adoptive homes in accordance with 24 CFR 5.576. • Is homeless or at risk of becoming homeless at age 16 or older; - At risk of being homeless is fully defined at 24 CFR 576.2. o This includes a person that is exiting a publicly funded institution, or system of care (such as a healthcare facility, a mental health facility, foster care or other youth facility, or correction program or institution).
o Therefore, youth being discharged from an institution may be eligible for a FUP voucher [FUP FAQs].
• Has an annual income at or below 30 percent of area median income; and • Does not have sufficient resources or support networks (e.g., family, friends, faith-based or other social networks) immediately available to prevent them from moving to a supervised publicly or privately operated shelter designed to provide temporary living arrangements.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

19-I.E. ASSISTANCE PERIOD [FR Notice 1/24/22]
Maximum Assistance Period
Although there is no time limit on FUP family vouchers, FUP youth vouchers are limited by statute. Unless the FUP youth meets an exception outlined below, after 36 months of assistance, the FUP youth voucher must be terminated. However, any period of time for which no subsidy (HAP) is being paid on behalf of the youth does not count toward the 36-month limitation.

If the FUP youth does meet the requirements outlined below, the statutory limit on FUP assistance is a total of 60 months of FUP voucher assistance [FR Notice 1/24/22].

Extension of Assistance
FUP youth who first leased or lease a unit after December 27, 2020, may be eligible for an extension of assistance up to 24 months beyond the 36-month time limit (for a total of 60 months of assistance).

While FUP youth cannot be required to participate in the Family Self-Sufficiency (FSS) program as a condition of receipt of assistance, an eligible youth who participates in the FSS program and is in compliance with the applicable terms and conditions of the program is entitled to receive assistance for up to an additional 24 months. A FUP youth must accept an FSS slot if it is offered to them prior to the 36-month mark in order to receive an extension of assistance (unless the youth meets one of the statutory exceptions described below).

Statutory Exceptions
A FUP youth will be entitled to receive an extension of assistance for up to 24 months beyond the 36-month time limit without participating in the PHA’s FSS program if they certify that they meet one of the exceptions below:
• The FUP youth is a parent or other household member responsible for the care of a dependent child under the age of six or for the care of an incapacitated person.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

The FUP youth is a person who is regularly and actively participating in a drug addiction or alcohol treatment and rehabilitation program.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

Education, Workforce Development, or Employment Activities If a PHA that carries out an FSS program is unable to offer a FUP youth an FSS slot during their first 36 months of receiving FUP youth assistance, the youth is considered to have been “unable to enroll” in the program and may have their voucher extended by meeting the education, workforce development, or employment criteria described below:
• The youth was engaged in obtaining a recognized postsecondary credential or a secondary school diploma or its recognized equivalent.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
• The youth was enrolled in an institution of higher education, as such term is defined in section 101(a) of the Higher Education Act of 1965 (20 U.S.C. 1001(a)) or an institution that meets the definition of a proprietary institution of higher education or a postsecondary vocational institution under sections 102(b)(1) and (c)(1) of the Higher Education Act of 1965 (20 U.S.C. 1002(b)(1) and (c)(1)), respectively.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

The youth was participating in a career pathway, as such term is defined in Section 3 of the Workforce Innovation and Opportunity Act (29 U.S.C. 3102). The term career pathway means a combination of rigorous and high-quality education, training, and other services that:
- Aligns with the skill needs of industries in the economy of the state or regional economy involved;
- Prepares an individual to be successful in any of a full range of secondary or postsecondary education options, including apprenticeships registered under the Act of August 16, 1937 (commonly known as the “National Apprenticeship Act”; 50 Stat. 664, chapter 663; 29 U.S.C. 50 et seq.) (referred to individually in this Act as an apprenticeship, except in section 3226 of this title);
- Includes counseling to support an individual in achieving the individual’s education and career goals;
- Includes, as appropriate, education offered concurrently with and in the same context as workforce preparation activities and training for a specific occupation or occupational cluster;
- Organizes education, training, and other services to meet the particular needs of an individual in a manner that accelerates the educational and career advancement of the individual to the extent practicable;
- Enables an individual to attain a secondary school diploma or its recognized equivalent, and at least one recognized postsecondary credential; and - Helps an individual enter or advance within a specific occupation or occupational cluster. • The youth was employed.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
FSS Enrollment at 24 Months
If the FUP youth has not been provided an opportunity to enroll in the FSS program during the first 24 months of FUP assistance, HUD encourages the PHA to remind the youth at the 24- month reexamination of the education, workforce development, and employment requirements described above so that the youth has enough time to meet these requirements prior to the expiration of the 36-month time period for FUP assistance.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

FSS Enrollment Between 36 and 48 Months
If an FSS slot becomes available between the 36-month and 48-month mark:
• The PHA must offer the slot to a FUP youth who had their voucher extended based on meeting the education, workforce development, or employment requirement listed above, or one of the statutory exceptions listed above (even if the youth previously declined an FSS slot because they met one of the statutory exceptions). • The PHA must work with the youth to determine whether enrollment in FSS is feasible and in their best interest given any education, workforce development, or employment activities that the youth is engaged in and any statutory exceptions that apply to the youth, as well as the remaining time on their voucher.
• If the FUP youth accepts the FSS slot, the PHA must work with the youth to establish Contract of Participation goals and an Individual Training and Services Plan (ITSP) that can be accomplished within the time period left on the voucher.

If the FUP youth is offered an FSS slot prior to the 36-month mark, the youth:
• Will be required to enroll in the FSS program in order to receive an extension of assistance at the end of the 36-month time period (unless they meet one of the statutory exceptions described above).
• Will not be considered to have been “unable to enroll” in the FSS program as described above, and as a result, will not be eligible to receive an extension of assistance based on meeting the education, workforce development, or employment requirements described above.

FSS Enrollment After 48 Months
The PHA may, but is not required to, offer a FUP youth an FSS slot that becomes available between the 48-month mark and the 60-month mark, since the youth will have already received their second and final extension.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Extensions of Assistance
At the 36-month and 48-month reexamination, the PHA must extend FUP youth assistance if the youth is participating in and in compliance with the FSS program as long as the youth is still eligible for the HCV program.

In any case, the FUP youth cannot receive more than a total of 60 months of FUP youth voucher assistance, even if the FSS Contract of Participation time period extends beyond the voucher 60- month mark.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

No FSS Program or Unable to Enroll in FSS
If a PHA does not carry out an FSS program or the FUP youth has been unable to enroll in the program during the first 36 months of receiving FUP assistance, the FUP youth is entitled to receive an extension of assistance for up to two successive 12-month periods beyond the 36- month time limit provided that the youth engaged in at least one of the education, workforce development, or employment activities described above for not less than nine months of the 12- month period preceding each extension. In order to meet the nine months out of the preceding 12 months requirement, the youth may have engaged in one of the education, workforce development, or employment activities described above or a combination of these activities.

Verification Prior to Annual Reexam
In order to provide an extension of assistance, the PHA must verify compliance with the above requirements at the end of the 36-month time period and the 48-month time periods. The PHA does not need to verify compliance with these requirements at the end of the 60-month time period since the maximum length of assistance is 60 months.

To verify compliance with the education, workforce development, or employment requirement or one of the statutory exceptions, the PHA must provide the FUP youth written notification informing them that they may receive an extension of their FUP assistance and providing instructions on how the youth may demonstrate that they meet one of these conditions. This notification must be provided sufficiently in advance of the end of the 36-month or 48-month time periods, as applicable, to allow the FUP youth to demonstrate that they meet the education, workforce development, or employment requirement, or one of the statutory exceptions, and for the PHA to conduct an annual reexamination prior to the expiration of the FUP assistance.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

The PHA will use the following verification methods to verify a FUP youth’s eligibility for voucher extensions:

To verify compliance with the FSS requirement, the PHA will examine its records to confirm, or obtain confirmation from the PHA’s FSS program staff, that the FUP youth participant is in compliance with FSS program requirements and has not been terminated from the FSS program.

To meet the education, workforce development, or employment requirement, the PHA will verify that the FUP youth was engaged in at least one education, workforce development, or employment activity for at least nine months of the 12-month period immediately preceding the end of 36-month or 48-month time period, as applicable.

Due to the timing of when the PHA verifies compliance and conducts the annual reexamination, the FUP youth may have not yet met the ninemonth requirement but may be able to demonstrate that they will meet the nine-month requirement as of the end of the 36-month or 48-month time period. In such cases, the FUP/FYI youth will still be considered to have met the requirements.

In order for the FUP youth to meet one of the statutory exceptions described above, the youth must submit a certification to the PHA that they meet one of these exceptions. This certification is the only documentation that the FUP youth must submit in order to demonstrate that they meet one of the statutory exceptions.

A FUP youth who received an extension of voucher assistance at the end of the 36-month time period based on meeting one of the conditions described in this chapter does not have to meet the same conditions when they reach the end of the 48-month time period. The FUP youth may demonstrate that they meet a different condition in order to receive an extension of their assistance.

If the PHA determines that the youth meets one of the statutory conditions, the PHA would then conduct an annual reexamination. If the annual reexamination determines that the youth is still eligible for the HCV program, the PHA must provide the FUP youth the extension of voucher assistance.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

Termination of Assistance for Failure to Meet Conditions Failure of the FUP youth to meet one of the above conditions will only impact their ability to receive subsequent extensions of assistance. It will not serve as a basis for terminating the FUP assistance prior to the annual reexam.

If the FUP youth does not meet any of the conditions described in in this chapter, the youth is subject to the statutory time limit of 36 months or the time limit of any extension that the youth has already received, and the FUP youth voucher must be terminated once the youth reaches this time limit. The calculation of the time limit begins from the date the first HAP contract is signed (for tenant-based vouchers) or from the date the youth entered into the initial lease agreement (for project-based vouchers). The number of months is calculated based on the number of months that HAP subsidy is being paid on behalf of the youth, not the number of months that the youth is in the FUP youth program. Prior to termination, the PHA must offer the FUP youth the opportunity to request an informal hearing, in accordance with Chapter 16.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

19-I.F. REFERRALS AND WAITING LIST MANAGEMENT
Referrals
The PCWA must establish and implement a system to identify FUP-eligible families and youths within the agency’s caseload and make referrals to the PHA. The PCWA must certify that the FUP applicants they refer to the PHA meet FUP eligibility requirements. The PHA is not required to maintain full documentation that demonstrates the family’s or youth’s FUP eligibility as determined by the PCWA but should keep the referral or certification from the PCWA.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
A PHA must serve any referrals (youths or families) that meet all program eligibility requirements. If a PHA determines that it has received a sufficient number of referrals from the PCWA so that the PHA will be able to lease all FUP vouchers awarded, the PHA may request that the PCWA suspend transmission of referrals. If the PHA determines that additional referrals will be needed after it has made such a request, the PHA may request that the PCWA resume transmission of referrals [Notice PIH 2011-52].

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

Waiting List Placement
A family that is already participating in the regular HCV program cannot be transferred to a FUP voucher.

Once a referral is made, the PHA must compare the list of PCWA referrals to its HCV waiting list to determine if any applicants on the PCWA’s referral list are already on the PHA’s HCV waiting list. Applicants already on the PHA’s HCV waiting list retain the order of their position on the list. Applicants not already on the PHA’s HCV waiting list must be placed on the HCV waiting list.

If the PHA’s HCV waiting list is closed, the PHA must open its HCV waiting list in order to accept new FUP applicants. If necessary, the PHA may open its waiting list solely for FUP applicants, but this information must be included in the PHA’s notice of opening its waiting list (see section 4-II.C., Opening and Closing the Waiting List of this administrative plan).

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Waiting List Selection
The PHA selects FUP-eligible families or youths based on the PHA’s regular HCV waiting list selection policies in Chapter 4, including any preferences that may apply.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

19-I.G. PHA HCV ELIGIBILITY DETERMINATION
Once a FUP-eligible family or youth is selected from the HCV waiting list, the PHA must determine whether the family or youth meets HCV program eligibility requirements. Applicants must be eligible under both FUP family or youth eligibility requirements, as applicable, and HCV eligibility requirements as outlined in Chapter 3 of this policy.

The PCWA may, but is not obligated to, provide information to the PHA on the family’s criminal history.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Additional FUP Eligibility Factors [FUP FAQs]
For FUP family vouchers, the family must remain FUP-eligible thorough lease-up. • If, after a family is referred by the PCWA but prior to issuing a family FUP voucher, the PHA discovers that the lack of adequate housing is no longer a primary factor for the family not reunifying, the FUP voucher may not be issued to the family. • Similarly, if the FUP voucher has already been issued before the PHA discovers that the reunification will not happen, but the family has not yet leased up under the voucher, the PHA must not execute the HAP contract, as the family is no longer FUP-eligible.

FUP-eligible youth must be no more than 24 years old both at the time of PCWA certification and at the time of the HAP execution. If a FUP youth is 24 at the time of PCWA certification but will turn 25 before the HAP contract is executed, the youth is no longer eligible for a FUP youth voucher.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

19.I.H. LEASE UP [FR Notice 1/24/22]
Once the PHA determines that the family or youth meets HCV eligibility requirements, the family or youth will be issued a FUP voucher in accordance with PHA policies.

During the family briefing, PHAs must inform the FUP youth of:
• The extension of assistance provisions and requirements; • The availability of the FSS program and offer them an FSS slot, if available, or offer to place them on the FSS waiting list (provided the PHA has an FSS program); and • Supportive services available to them, the existence of any other programs or services, and their eligibility for such programs and services. However, participation in supportive services cannot be required as a condition of receiving FUP youth assistance.

PHA Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Once the family or youth locate a unit, the PHA conducts all other processes relating to voucher issuance and administration per HCV program regulations and the PHA’s policies (including, but not limited to: NSPIRE inspections, determination of rent reasonableness, etc.).

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

19-I.I. TERMINATION OF ASSISTANCE
General Requirements
With the exception of terminations of assistance for FUP youth after the statutorily required time period, terminations of FUP assistance are handled in the same way as the regular HCV program.

Termination of a FUP voucher must be consistent with regulations for termination in 24 CFR Part 982, Subpart L and be in compliance with PHA policies (Chapter 12).

If the person who qualifies for the FUP voucher passes away, the family retains the FUP voucher. In the case of a FUP-youth voucher, assistance will terminate after the statutorily required time period, even if the FUP-eligible youth is no longer included in the household.

If the person who qualifies for the FUP voucher moves, the remaining family members may keep the FUP voucher based on PHA policy (see administrative plan, Section 3-I.C., Family Breakup and Remaining Member of Tenant Family).

FUP Family Vouchers
If parents lose their parental rights or are separated from their children after voucher lease-up (or their children reach adulthood), the family is still eligible to keep their FUP assistance, as the regulations do not permit HCV termination for a family losing parental rights or the children reaching adulthood. However, the PHA may transfer the assistance of a FUP family voucher holder to regular HCV assistance if there are no longer children in the household.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

FUP Youth Vouchers
A PHA cannot terminate a FUP youth’s assistance for noncompliance with PCWA case management, nor may the PHA terminate assistance for a FUP youth for not accepting services from the PCWA.

The PHA may not transfer the assistance of a FUP youth voucher holder to regular HCV assistance upon the expiration of the statutorily required time period. However, the PHA may issue a regular HCV to FUP youth if they were selected from the waiting list in accordance with PHA policies and may also adopt a preference for FUP youth voucher holders who are being terminated for this reason.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Upon the expiration of the statutorily required time period, a FUP youth voucher holder who has children and who lacks adequate housing may qualify for a FUP family voucher provided they are referred by the PCWA as an eligible family and meet the eligibility requirements for the PHA’s HCV program.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

9-I.J. FUP PORTABILITY
Portability for a FUP family or youth is handled in the same way as for a regular HCV family. A PHA may not restrict or deny portability for a FUP family or youth for reasons other than those specified in the HCV program regulations, as reflected in Chapter 10 of the administrative plan.

A FUP family or youth does not have to port to a jurisdiction that administers FUP.

If the receiving PHA administers the FUP voucher on behalf of the initial PHA, the voucher is still considered a FUP voucher regardless of whether the receiving PHA has a FUP program.

If the receiving PHA absorbs the voucher, the receiving PHA may absorb the incoming port into its FUP program (if it has one) or into its regular HCV program (if the receiving PHA has vouchers available to do so) and the family or youth become regular HCV participants. In either case, when the receiving PHA absorbs the voucher, a FUP voucher becomes available to the initial PHA.

Considerations for FUP Youth Vouchers
If the voucher is a FUP youth voucher and remains such upon lease-up in the receiving PHA’s jurisdiction, termination of assistance must still take place once the youth has received assistance for the statutorily required time period. If the receiving PHA is administering the FUP youth voucher on behalf of the initial PHA, the two PHAs must work together to initiate termination upon expiration of the statutorily required time period. 19-I.K. PROJECT-BASING FUP VOUCHERS [Notice PIH 2017-21; FR Notice 1/24/22] The PHA may project-base FUP vouchers without HUD approval in accordance with Notice PIH 2017-21, FR Notice 1/24/22, and all statutory and regulatory requirements for the PBV program.

Project-based FUP vouchers are subject to the PBV program percentage limitation discussed in Section 17-I.A.

The PHA may limit PBVs to one category of FUP-eligible participants (families or youth) or a combination of the two.

While FUP vouchers can be used for either families or youth, a PBV unit may only be counted towards the PHA’s 10 percent exception authority under the program cap and the project’s income-mixing requirement if the FUP PBV assistance is provided on behalf of an eligible youth. The PHA must amend its administrative plan to include the limitation of these FUP PBV units to eligible youth.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

PART II: FOSTER YOUTH TO INDEPENDENCE INITIATIVE
19-II.A. PROGRAM OVERVIEW [Notice PIH 2020-28; Notice PIH 2023-04; FR Notice 1/24/22]
The Foster Youth to Independence (FYI) initiative was announced in 2019. The FYI initiative allows PHAs who partner with a Public Child Welfare Agency (PCWA) to request targeted HCVs to serve eligible youth with a history of child welfare involvement that are homeless or at risk of being homeless. Rental assistance and supportive services are provided to qualified youth for a period of between 36 and 60 months.

Funding is available either competitively though an FYI NOFA or noncompetitively on a rolling basis in accordance with the application requirements outlined in Notice PIH 2020-28, Notice PIH 2021-26, or Notice PIH 2023-04, as applicable. Under the noncompetitive process, PHAs are limited to 25 vouchers in a fiscal year with the ability to request additional vouchers. Where the PHA has a combined FYI and/or FUP size of no more than 10 vouchers, the PHA may request FYI vouchers with at least 50 percent utilization of its FUP and/or FYI vouchers. Where the PHA has a combined FYI and/or FUP size of 11 or more vouchers, the PHA may request FYI vouchers with 90 percent or greater utilization of its FUP and/or FYI vouchers. For competitive awards, the number of vouchers is dependent on PHA program size and need.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

19-II.B. PARTNERING AGENCIES [Notice PIH 2023-04; FYI Updates and Partnering Opportunities Webinar]
Public Child Welfare Agency (PCWA)
The PHA must enter into a partnership agreement with a PCWA in the PHA’s jurisdiction in the form of a Memorandum of Understanding (MOU) or letter of intent. The PCWA is responsible for identifying and referring eligible youth to the PHA and providing or securing a commitment for the provision of supportive services once youth are admitted to the program.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
The PCWA is responsible for:
• Identifying FYI-eligible youth;
• Developing a system of prioritization based on the level of need of the youth and the appropriateness of intervention;
• Providing a written certification to the PHA that the youth is eligible; and • Providing or securing supportive services for 36 months.

Continuum of Care (CoC) and Other Partners
HUD strongly encourages PHAs to add other partners into the partnership agreement with the PCWA such as state, local, philanthropic, faith-based organizations, and the CoC, or a CoC recipient it designates.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

19-II.C. YOUTH ELIGIBILITY CRITERIA [Notice PIH 2023-04; FYI Q&As; FYI FAQs] The PCWA is responsible for certifying that the youth has prior qualifying foster care involvement. As determined by the PCWA, eligible youth:
• Are at least 18 years of age and not more than 24 years of age (have not yet reached their 25th birthday);
- Youth must be no more than 24 years of age at the time the PCWA certifies them as eligible and at the time of HAP contract execution.
• Have left foster care or will leave foster care within 90 days, in accordance with a transition plan described in section 475(5)(H) of the Social Security Act; - Placements can include, but are not limited to, placements in foster family homes, foster homes of relatives, group homes, emergency shelters, residential facilities, child care institutions, and pre-adoptive homes in accordance with 24 CFR 5.576; • Are homeless or at risk of becoming homeless at age 16 and older; - At risk of being homeless is fully defined at 24 CFR 576.2. o This includes a person that is exiting a publicly funded institution, or system of care (such as a healthcare facility, a mental health facility, foster care or other youth facility, or correction program or institution). Therefore, youth being discharged from an institution may be eligible for an FYI voucher [FYI FAQs].

Eligibility is not limited to single persons. For example, pregnant and/or parenting youth are eligible to receive assistance assuming they otherwise meet eligibility requirements.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

19-II.D. SUPPORTIVE SERVICES [Notice PIH 2023-04; FYI Updates and Partnering Opportunities Webinar; FYI Q&As]
Supportive services may be provided by the PHA, PCWA, or a third party. The PCWA must provide or secure a commitment to provide supportive services for participating youth for the period of time defined in the NOFA/O for which the funding was made available. At a minimum, the following supportive services must be offered:
• Basic life skills information/counseling on money management, use of credit, housekeeping, proper nutrition/meal preparation, and access to health care (e.g., doctors, medication, and mental and behavioral health services);
• Counseling on compliance with rental lease requirements and with HCV program participant requirements, including assistance/referrals for assistance on security deposits, utility hookup fees, and utility deposits; • Providing such assurances to owners of rental property as are reasonable and necessary to assist eligible youth to rent a unit with a voucher;
• Job preparation and attainment counseling (where to look/how to apply, dress, grooming, relationships with supervisory personnel, etc.); and
• Educational and career advancement counseling regarding attainment of general equivalency diploma (GED) or attendance/financing of education at a technical school, trade school, or college, including successful work ethic and attitude models.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Since participation in supportive services is optional, but strongly encouraged, an FYI participant may decline supportive services.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

19-II.E. REFERRALS AND WAITING LIST MANAGEMENT [Notice PIH 2023-04; FYI Updates and Partnering Opportunities Webinar FYI FAQs] Referrals
The PCWA is responsible for certifying that the youth has prior qualifying foster care involvement. Once the PCWA sends the PHA the referral certifying the youth is programeligible, the PHA determines HCV eligibility.

The PCWA must have a system for identifying eligible youth within the agency’s caseload and reviewing referrals from other partners, as applicable. The PCWA must also have a system for prioritization of referrals to ensure that youth are prioritized for an FYI voucher based upon their level of need and appropriateness of the intervention.

Referrals may come from other organizations in the community who work with the population, but the PCWA must certify that the youth meets eligibility requirements, unless the PCWA has vested another organization with this authority.

The PHA is not required to maintain full documentation that demonstrates the youth’s eligibility as determined by the PCWA but should keep the referral or certification from the PCWA. The PCWA is not required to provide the PHA with HCV eligibility documents.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

Waiting List Placement [Notice PIH 2023-04 and FYI FAQs] The PHA must use the HCV waiting list for the FYI program. Youth already on the HCV program may not be transferred to an FYI voucher since they are not homeless or at-risk of homelessness.

Once a referral is made, the PHA must compare the list of PCWA referrals to its HCV waiting list to determine if any applicants on the PCWA’s referral list are already on the PHA’s HCV waiting list. Applicants already on the PHA’s HCV waiting list retain the order of their position on the list. Applicants not already on the PHA’s HCV waiting list must be placed on the HCV waiting list.

If the PHA’s HCV waiting list is closed, the PHA must open its HCV waiting list in order to accept new referrals. The PHA may reopen the waiting list to accept an FYI eligible youth without opening the waiting list for other applicants; however, the requirements at 24 CFR 982.206 for giving public notice when opening and closing the waiting list apply (see section 4- II.C., Opening and Closing the Waiting List of this administrative plan).

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher.

Waiting List Selection
The PHA selects eligible youths based on the PHA’s regular HCV waiting list selection policies in Chapter 4, including any preferences that may apply.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

19-II.F. PHA HCV ELIGIBILITY DETERMINATION [FYI FAQs]
Once an eligible youth is selected from the HCV waiting list, the PHA must determine whether the youth meets HCV program eligibility requirements. Applicants must be eligible under both FYI eligibility requirements and HCV eligibility requirements as outlined in Chapter 3 of this policy.

The PCWA may, but is not obligated to, provide information to the PHA on the youth’s criminal history.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Additional Eligibility Factors
Youth must be no more than 24 years old both at the time of PCWA certification and at the time of the HAP execution. If a youth is 24 at the time of PCWA certification but will turn 25 before the HAP contract is executed, the youth is no longer eligible for a FYI voucher.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

19-II.G. LEASE UP [FR Notice 1/24/22]
Once the PHA determines that the family or youth meets HCV eligibility requirements, the youth will be issued an FYI voucher in accordance with PHA policies.

During the family briefing, PHAs must inform the FYI voucher holder of:
• The extension of assistance provisions and requirements; • The availability of the FSS program and offer them an FSS slot, if available, or offer to place them on the FSS waiting list (provided the PHA has an FSS program); and • The supportive services available to them, the existence of any other programs or services, and their eligibility for such programs and services. However, participation in supportive services cannot be required as a condition of receiving FYI assistance.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Once the youth locates a unit, the PHA conducts all other processes relating to voucher issuance and administration per HCV program regulations and the PHA policy in Chapter 9.

Should a youth fail to use the voucher, the PHA may issue the voucher to another eligible youth if one has been identified [Notice PIH 2023-04].

Turnover [Notice PIH 2023-04]
Awards of FYI Tenant Protection Vouchers (TPVs) continue to be administered under the requirements of Notice PIH 2019-20. This includes turnover requirements and the requirement to inform HUD should a youth not use a voucher or leave the program. For example, FYI TPVs awarded under Notice PIH 2019-20 “sunset” when a youth leaves the program. This means that the PHA cannot reissue FYI TPV assistance issued under that notice to another youth when an initial youth exits the HCV program. HUD does not have the authority to allow the voucher to be used for a youth other than the one identified in the request.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

19-II.H. MAXIMUM ASSISTANCE PERIOD [Notice PIH 2023-04 and FYI FAQs; FR Notice 1/24/22]
Vouchers are limited by statute to a total of between 36 months and 60 months of housing assistance. At the end of the statutory time period, assistance must be terminated. However, any period of time for which no subsidy (HAP) is being paid on behalf of the youth does not count toward the limitation. It is not permissible to reissue another FYI TPV to the same youth upon expiration of their FYI assistance.

Participants do not “age out” of the program. A participant may continue with the program until they have received the period of assistance for which they are eligible. Age limits are only applied for entry into the program.

Extension of Assistance
FYI voucher holders who first leased or lease a unit after December 27, 2020, may be eligible for an extension of assistance up to 24 months beyond the 36-month time limit (for a total of 60 months of assistance).

While FYI voucher holders cannot be required to participate in the Family Self-Sufficiency (FSS) program as a condition of receipt of assistance, an eligible youth who participates in the FSS program and is in compliance with the applicable terms and conditions of the program is entitled to receive assistance for up to an additional 24 months. A FYI voucher holders must accept an FSS slot if it is offered to them prior to the 36-month mark in order to receive an extension of assistance (unless the youth meets one of the statutory exceptions described below).

Statutory Exceptions
FYI voucher holders will be entitled to receive an extension of assistance for up to 24 months beyond the 36-month time limit without participating in the PHA’s FSS program if they certify that they meet one of the exceptions below:
• The FYI voucher holder is a parent or other household member responsible for the care of a dependent child under the age of six or for the care of an incapacitated person.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
• The FYI voucher holder is a person who is incapable of complying with the requirement to participate in a FSS program as described above or engage in education, workforce development, or employment activities as described below, as applicable, due to a documented medical condition.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
An FYI voucher holder that meets one of the above exceptions must still be offered an opportunity to enroll in the PHA’s FSS program (if it is available to them) and receive any supportive services available to FYI voucher holders. An FYI voucher holder may choose to participate in an FSS program or engage in education, workforce development, or employment activities, even if they meet one of the above statutory exceptions.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

Education, Workforce Development, or Employment Activities If a PHA that carries out an FSS program is unable to offer a FYI voucher holder an FSS slot during their first 36 months of receiving FYI assistance, the FYI voucher holder is considered to have been “unable to enroll” in the program and may have their voucher extended by meeting the education, workforce development, or employment criteria described below:
• The FYI voucher holder was engaged in obtaining a recognized postsecondary credential or a secondary school diploma or its recognized equivalent.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher.
• The FYI voucher holder was enrolled in an institution of higher education, as such term is defined in section 101(a) of the Higher Education Act of 1965 (20 U.S.C. 1001(a)) or an institution that meets the definition of a proprietary institution of higher education or a postsecondary vocational institution under sections 102(b)(1) and (c)(1) of the Higher Education Act of 1965 (20 U.S.C. 1002(b)(1) and (c)(1)), respectively.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

The FYI voucher holder was participating in a career pathway, as such term is defined in Section 3 of the Workforce Innovation and Opportunity Act (29 U.S.C. 3102). • The FYI voucher holder was employed.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher.

FSS Enrollment at 24 Months
If the FYI voucher holder has not been provided an opportunity to enroll in the FSS program during the first 24 months of FYI assistance, HUD encourages the PHA to remind the FYI voucher holder at the 24-month reexamination of the education, workforce development, and employment requirements described above so that they have enough time to meet these requirements prior to the expiration of the 36-month time period for FYI assistance.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher.

FSS Enrollment Between 36 and 48 Months
If an FSS slot becomes available between the 36-month and 48-month mark:
• The PHA must offer the slot to an FYI voucher holder who had their voucher extended based on meeting the education, workforce development, or employment requirement listed above, or one of the statutory exceptions listed above (even if the FYI voucher holder previously declined an FSS slot because they met one of the statutory exceptions). • The PHA must work with the FYI voucher holder to determine whether enrollment in FSS is feasible and in their best interest given any education, workforce development, or employment activities that the FYI voucher holder is engaged in and any statutory exceptions that apply to the FYI voucher holder, as well as the remaining time on their voucher. • If the FYI voucher holder accepts the FSS slot, the PHA must work with them to establish Contract of Participation goals and an Individual Training and Services Plan (ITSP) that can be accomplished within the time period left on the voucher.

If the FYI voucher holder is offered an FSS slot prior to the 36-month mark, the FYI voucher holder:
• Will be required to enroll in the FSS program in order to receive an extension of assistance at the end of the 36-month time period (unless they meet one of the statutory exceptions described above).

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

• Will not be considered to have been “unable to enroll” in the FSS program, and as a result, will not be eligible to receive an extension of assistance based on meeting the education, workforce development, or employment requirements described above.

FSS Enrollment After 48 Months
The PHA may, but is not required, to offer an FYI voucher holder an FSS slot that becomes available between the 48-month mark and the 60-month mark, since the FYI voucher holder will have already received their second and final extension.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Extensions of Assistance
At the 36-month and 48-month reexamination, the PHA must extend FYI assistance if the FYI voucher holder is participating in and in compliance with the FSS program as long as the FYI voucher holder is still eligible for the HCV program.

In any case, the FYI voucher holder cannot receive more than a total of 60 months of FYI assistance even if the FSS Contract of Participation time period extends beyond the voucher 60- month mark.

No FSS Program or Unable to Enroll in FSS
If a PHA does not carry out an FSS program or the FYI voucher holder has been unable to enroll in the program during the first 36 months of receiving FYI assistance, the FYI voucher holder is entitled to receive an extension of assistance for up to two successive 12-month periods beyond the 36-month time limit provided that the FYI voucher holder engaged in at least one of the education, workforce development, or employment activities described above for not less than nine months of the 12-month period preceding each extension. In order to meet the nine months out of the preceding 12 months requirement, the FYI voucher holder may have engaged in one of the education, workforce development, or employment activities described above or a combination of these activities.

Verification Prior to Annual Reexam
In order to provide an extension of assistance, the PHA must verify compliance with the above requirements at the end of the 36-month time period and the 48-month time periods. The PHA does not need to verify compliance with these requirements at the end of the 60-month time period since the maximum length of assistance is 60 months.

To verify compliance with the education, workforce development, or employment requirement or one of the statutory exceptions, the PHA must provide the FYI voucher holder written notification informing them that they may receive an extension of their FYI assistance and providing instructions on how the FYI voucher holder may demonstrate that they meet one of these conditions. This notification must be provided sufficiently in advance of the end of the 36- month or 48-month time periods, as applicable, to allow the FYI voucher holder to demonstrate that they meet the education, workforce development, or employment requirement, or one of the statutory exceptions, and for the PHA to conduct an annual reexamination prior to the expiration of the FYI assistance.

Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

19-II.I. TERMINATION OF ASSISTANCE [FYI FAQs]
Termination of a FYI voucher is handled in the same way as with any HCV; therefore, termination of a FYI voucher must be consistent with HCV regulations at 24 CFR Part 982, Subpart L and PHA policies in Chapter 12. Given the statutory time limit that requires FYI vouchers to sunset, a PHA must terminate the youth’s assistance once the limit on assistance has expired.

A PHA cannot terminate a FYI youth’s assistance for noncompliance with PCWA case management, nor may the PHA terminate assistance for a FYI youth for not accepting services from the PCWA.

The PHA may not transfer the assistance of FYI voucher holders to regular HCV assistance upon the expiration of the limit on assistance. However, the PHA may issue a regular HCV to FYI voucher holders if they were selected from the waiting list in accordance with PHA policies. The PHA may also adopt a waiting list preference for FYI voucher holders who are being terminated for this reason.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends

19-II.J. PORTABILITY [FYI FAQs]
Portability for an FYI youth is handled in the same way as for a regular HCV family. A PHA may not restrict or deny portability for an FYI youth for reasons other than those specified in the HCV program regulations, as reflected in Chapter 10 of the administrative plan.

An FYI youth does not have to port to a jurisdiction that administers FYI vouchers.

If the receiving PHA absorbs the voucher, the PHA may absorb the youth into its regular HCV program if it has vouchers available to do so. If the receiving PHA absorbs the youth into its regular HCV program, that youth becomes a regular HCV participant with none of the limitations of an FYI voucher.

The initial and receiving PHA must work together to initiate termination of assistance upon expiration of the time limit on assistance.
19-II.K. PROJECT-BASING FYI VOUCHERS [FYI FAQs; FR Notice 1/24/22; Notice PIH 2024-03]
PHAs that have initiated the selection process to project-base FYI and/or FUP vouchers may be eligible to project-base FYI and FUP units formally identified for project basing in accordance with all applicable PBV regulations and PHA policies in Chapter 17. This includes FYI vouchers awarded under Notices PIH 2020-28, PIH 2021-26, and PIH 2023-04. Assistance awarded under Notice PIH 2019-20 is prohibited from being project-based.

HACN Policy
This section is not applicable to HACN as the PHA does not administer this special purpose voucher
Item 2.

Housing Authority
of the Administrative Plan 4/1/24
City of Needles

Page 19 ends
← All documents from this meeting