Cities Index.
Agenda packet

Newark City Council
May 25, 2023

Document
Agenda packet
Meeting
May 25, 2023
Body
Newark City Council
Pages
17
Original file
177.7 MB
Text extracted from the city's file for reading and search. Open the original on public.destinyhosted.com. That file is the official record.

Site Code: 1
Station ID:

CEDAR BLVD N.O SMITH AVE
All Traffic Data Services, LLC
www.alltrafficdata.net
Start 14-Sep-21
Time Tue SB
12:00 AM 27
01:00 10
02:00 7
03:00 8
04:00 21
05:00 73
06:00 148
07:00 499
08:00 819
09:00 277
10:00 281
11:00 321
12:00 PM 331
01:00 332
02:00 542
03:00 774
04:00 631
05:00 484
06:00 355
07:00 247
08:00 151
09:00 102
10:00 44
11:00 34
Total 6518
AM Peak - 08:00 - - - - - - - -
Vol. - 819 - - - - - - - -
PM Peak - 15:00 - - - - - - - -
Vol. - 774 - - - - - - - -
Grand Total 6518

ADT ADT 6,518 AADT 6,518
Packet Page 2449

Page 1 ends

Site Code: 2
Station ID:

CEDAR BLVD S.O SMITH AVE
All Traffic Data Services, LLC
www.alltrafficdata.net
Start 14-Sep-21
Time Tue NB
12:00 AM 35
01:00 16
02:00 6
03:00 8
04:00 7
05:00 26
06:00 72
07:00 260
08:00 453
09:00 210
10:00 214
11:00 255
12:00 PM 317
01:00 357
02:00 426
03:00 877
04:00 534
05:00 472
06:00 472
07:00 330
08:00 195
09:00 145
10:00 81
11:00 59
Total 5827
AM Peak - 08:00 - - - - - - - -
Vol. - 453 - - - - - - - -
PM Peak - 15:00 - - - - - - - -
Vol. - 877 - - - - - - - -
Grand Total 5827

ADT ADT 5,827 AADT 5,827
Packet Page 2450

Page 1 ends

Site Code: 3
Station ID:

SMITH AVE W.O CEDAR BLVD
All Traffic Data Services, LLC
www.alltrafficdata.net
Start 14-Sep-21
Time Tue EB
12:00 AM 3
01:00 1
02:00 1
03:00 3
04:00 3
05:00 20
06:00 17
07:00 53
08:00 104
09:00 38
10:00 34
11:00 39
12:00 PM 49
01:00 42
02:00 129
03:00 117
04:00 54
05:00 38
06:00 33
07:00 33
08:00 19
09:00 10
10:00 8
11:00 5
Total 853
AM Peak - 08:00 - - - - - - - -
Vol. - 104 - - - - - - - -
PM Peak - 14:00 - - - - - - - -
Vol. - 129 - - - - - - - -
Grand Total 853

ADT ADT 853 AADT 853
Packet Page 2451

SMITH AVE SMITH AVE CEDAR BLVD CEDAR BLVD
(303) 216-2439
www.alltrafficdata.net
Location: 1 CEDAR BLVD & SMITH AVE AM
Date: Tuesday, September 14, 2021
Peak Rolling Hour Flow Rates
Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - Pedestrians Traffic Counts - Motorized Vehicles
Note: Total study counts contained in parentheses.

Peak Hour: 07:45 AM - 08:45 AM
Peak 15-Minutes: 08:15 AM - 08:30 AM
885 519
0 0
827 470
111
120

0.81 N
S
EW

0.70 0.00

0.76 0.46
(1,318) (788)
()
()
(148)
(157)
(1,252) (713) 1010
1 0
0 0
44 0
67 0
0 783
0194510

SMITH AVE

SMITH AVE CEDAR BLVD

CEDAR BLVD
4 8
0 6 N
S
EW
5 3
0 0
2 2 3 3
0 0
00 1
0 0
0 0
00 0
0 0
0 2 N
S
W E
0 0
0 0 20 01
0 0 0
0 Left Thru Right Total
Interval Eastbound
Start Time
Rolling
Hour West East South North
Pedestrian Crossings
U-Turn
Westbound Northbound Southbound
U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right 7:00 AM 0 7 0 3 0 0 0 0 0 0 25 0 0 0 70 3 108 812 1 0 0 0 7:15 AM 0 6 0 5 0 0 0 0 0 2 72 0 0 0 127 5 217 1,151 1 0 0 0 7:30 AM 0 11 0 3 0 0 0 0 0 0 79 0 0 0 96 7 196 1,386 2 0 0 0 7:45 AM 0 13 0 5 0 0 0 0 0 1 81 0 0 0 165 26 291 1,466 0 2 0 4 8:00 AM 0 7 0 7 0 0 0 0 0 8 107 0 0 0 271 47 447 1,376 2 0 0 0 8:15 AM 0 34 0 26 0 0 0 0 0 7 147 0 0 0 214 24 452 1 6 0 0 8:30 AM 0 13 0 6 0 0 0 0 0 3 116 0 1 0 133 4 276 3 0 0 0 8:45 AM 0 6 0 5 0 0 0 0 0 2 63 0 0 0 116 9 201 1 0 0 1
Vehicle Type Left Thru Right
Eastbound
U-Turn
Westbound Northbound Southbound
U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right Total Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Lights 0 67 0 44 0 0 0 0 0 19 444 0 0 770 100 1 1,445
Mediums 0 0 0 0 0 0 0 0 0 0 7 0 0 13 1 0 21
Total 0 67 0 44 0 0 0 0 19 451 0 0 783 101 1,466 0 1
Packet Page 2452

SMITH AVE SMITH AVE CEDAR BLVD CEDAR BLVD
(303) 216-2439
www.alltrafficdata.net
Location: 1 CEDAR BLVD & SMITH AVE PM
Date: Tuesday, September 14, 2021
Peak Rolling Hour Flow Rates
Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - Pedestrians Traffic Counts - Motorized Vehicles
Note: Total study counts contained in parentheses.

Peak Hour: 04:00 PM - 05:00 PM
Peak 15-Minutes: 04:45 PM - 05:00 PM
631 565
0 0
597 534
54 57

0.90 N
S
EW

0.82 0.00

0.93 0.88
(1,115) (1,057)
()
()
(103)
(92)
(1,053) (1,006) 460
2 0
0 0
14 0
39 0
1 583
0105240

SMITH AVE

SMITH AVE CEDAR BLVD

CEDAR BLVD
0 0
0 3 N
S
EW
0 0
0 0
0 0 1 2
1 0
10 2
0 0
0 0
00 0
0 0
0 1 N
S
W E
1 0
0 0 01 02
0 0 0
0 Left Thru Right Total
Interval Eastbound
Start Time
Rolling
Hour West East South North
Pedestrian Crossings
U-Turn
Westbound Northbound Southbound
U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right 4:00 PM 0 9 0 2 0 0 0 0 0 1 142 0 1 0 141 16 312 1,219 0 0 0 0 4:15 PM 0 11 0 5 0 0 0 0 0 4 121 0 0 0 124 7 272 1,186 0 0 0 0 4:30 PM 0 9 0 4 0 0 0 0 0 2 131 0 0 0 134 16 296 1,145 2 0 0 0 4:45 PM 1 10 0 3 0 0 0 0 0 3 130 0 1 0 184 7 339 1,084 1 0 0 0 5:00 PM 0 7 0 6 0 0 0 0 0 2 125 0 0 0 129 10 279 994 0 0 0 0 5:15 PM 0 7 0 0 0 0 0 0 0 4 110 0 0 0 98 12 231 0 0 0 0 5:30 PM 0 11 0 1 0 0 0 0 0 0 107 0 0 0 105 11 235 1 0 0 0 5:45 PM 0 3 0 3 0 0 0 0 0 2 122 0 0 0 114 5 249 1 0 0 0 Vehicle Type Left Thru Right
Eastbound
U-Turn
Westbound Northbound Southbound
U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right Total Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 3
Lights 1 39 0 14 0 0 0 0 0 10 513 0 0 569 45 2 1,193
Mediums 0 0 0 0 0 0 0 0 0 0 11 0 0 11 1 0 23
Total 1 39 0 14 0 0 0 0 10 524 0 0 583 46 1,219 0 2
Packet Page 2453
Attachment B
Signal Warrant Worksheets
Packet Page 2454
Packet Page 2455
Packet Page 2456
Packet Page 2457
Packet Page 2458
Packet Page 2459
Cedar Boulevard Residential Development
38288-38594 Cedar Boulevard
Mitigation Monitoring & Reporting Program
City of Newark December 2022
Cedar Boulevard Residential Development Page 1
Avoidance/Mitigation Measures
Mitigation and
Monitoring
Responsibility
Monitoring Action Schedule
Air Quality
AQ-1 The project’s construction plans shall include the Bay Area Air Quality Management District’s (BAAQMD) Best
Management Practices for fugitive dust control that shall be implemented for all construction activities in the project area, as follows:
i. All exposed surfaces (e.g., parking areas, staging
areas, soil piles, graded areas, and unpaved access
roads) shall be watered two times per day.
ii. All haul trucks transporting soil, sand, or other loose material off-site shall be covered.
iii. All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum
street sweepers at least once per day. The use of dry
power sweeping is prohibited.
iv. All vehicle speeds on unpaved roads shall be limited to 15 mph.
v. All streets, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall
be laid as soon as possible after grading unless
seeding or soil binders are used.
vi. Idling times shall be minimized either by shutting
equipment off when not in use or reducing the
maximum idling time to 5 minutes (as required by the
California airborne toxics control measure Title 13,
Section 2485 of California Code of Regulations [CCR]).
vii. Clear signage shall be provided for construction
workers at all access points.
viii. All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s
specifications. All equipment shall be checked by a
certified mechanic and determined to be running in
proper condition prior to operation.
ix. A publicly visible sign shall be posted with the
telephone number and person to contact at the Lead
Agency regarding dust complaints. This person shall
respond and take corrective action within 48 hours.

The Air District’s phone number shall also be visible to ensure compliance with applicable regulations.

Implementation:

Project
contractor
Monitoring: City
of Newark Public
Works
Department,
BAAQMD
Observation of
conditions by
Building Inspectors
during construction
During
construction

EXHIBIT F
Packet Page 2460
Cedar Boulevard Residential Development
38288-38594 Cedar Boulevard
Mitigation Monitoring & Reporting Program
City of Newark December 2022
Cedar Boulevard Residential Development Page 2
Avoidance/Mitigation Measures
Mitigation and
Monitoring
Responsibility
Monitoring Action Schedule
AQ-2 The project developer and/or its construction
contractors shall be required to use off-road diesel
construction equipment compliant with U.S. EPA Tier 4 Final non-road engine standards. If Tier 4 Final equipment is unavailable for a portion of the project’s equipment fleet, then prior to the commencement of construction activities, an emissions estimate will be modeled to identify the portion of the fleet that must use Tier 4 Final engines to achieve a cancer risk value below the BAAQMD significance threshold of 10 in one million. The list shall be made available at the
construction site and shall be updated when new or
replacement construction equipment are brought to the site.

Implementation:

Project
contractor
Monitoring: City
of Newark Public
Works
Department
Observation of
conditions by
Building Inspectors
during construction
During
construction
Biological Resources
BIO-1 Should the demolition and construction activities commence during the bird nesting season (February 1 to
August 31), a pre-construction nesting bird survey shall be conducted by a qualified biologist no more than 14 days prior to the start of construction activities. Areas within 300 to 500 feet of construction shall be surveyed for active nests. Should active nests be identified, a disturbance-free buffer shall be established based on the needs of the species. The radius of the required buffer zone can vary depending on the species, (i.e., 75-100 feet for passerines and 200-500 feet for raptors), with the dimensions of any required buffer zones to be
determined by a qualified biologist in consultation with California Department of Fish and Wildlife (CDFW). To
delineate the buffer zone around the occupied habitat,
construction fencing shall be placed at the specified radius from the nest within which no machinery or workers shall intrude. The buffer zone shall be maintained and biological monitoring of active nests shall be conducted by a qualified biologist to ensure that nests are not disturbed and that buffers are appropriately adjusted by a qualified biologist as needed to avoid disturbance. No construction or earth-moving activity shall occur within any established nest protection buffer prior to September 1 unless it is determined by a qualified ornithologist/biologist that the young have fledged (that is, left the nest), have attained sufficient flight skills to avoid project construction zones, that the nesting cycle is otherwise completed, or the nest has failed. Should
construction activities cease for 14 consecutive days or more within the nesting season, an additional nesting bird survey shall be required prior to resuming construction if any of the Implementation:

Project
contractor
Monitoring: City
of Newark
Community
Development
Department
Observation of
conditions by
Building Inspectors
during construction
During
construction
Packet Page 2461
Cedar Boulevard Residential Development
38288-38594 Cedar Boulevard
Mitigation Monitoring & Reporting Program
City of Newark December 2022
Cedar Boulevard Residential Development Page 3
Avoidance/Mitigation Measures
Mitigation and
Monitoring
Responsibility
Monitoring Action Schedule
existing trees remain on or are adjacent to the site. Results of the pre-construction nesting bird survey shall be submitted to the City of Newark.

Cultural Resources
CUL-1 During project construction, if historic, archaeological or Native American materials or artifacts are identified, work within 50 foot radius of such find shall cease and the City shall retain the services of a qualified archeologist and/or
paleontologist to assess the significance of the find. If such find is determined to be significant by the archeologist and/or paleontologist, a resource protection plan conforming to CEQA §15064.5 shall be prepared by the archeologist and/or paleontologist and approved by the Community Development Director. The plan may include, but would not be limited to, removal of resources and similar actions. Project work may be resumed in compliance with such plan. If human remains are encountered, all ground disturbing activities near or in any area potentially overlying adjacent human remains shall cease, the County Coroner shall be contacted immediately, and the provisions of State law carried out.

Implementation:

Project
contractor
Monitoring: City
of Newark
Community
Development
Department
Observation of
conditions by
Building Inspectors
during construction
During
construction
Geology and Soils
GEO-1 The applicant shall provide evidence that structural considerations for construction on this site include the design parameters listed under CBC Seismic Design Criteria, and recommendations of the project’s Geotechnical Study, dated September 8, 2021, prepared by Geo-Logic Associates
including, but not limited, to recommendations related to grading, drainage, excavation, foundations systems, and compaction specifications shall be implemented. Final grading plan, construction plans, and building plans shall demonstrate that recommendations set forth in the geotechnical reports have been incorporated into the final design of the project and the design of the post-tensioned slab foundations addresses potential settlements from building loads and liquefaction to the satisfaction of the City of Newark City Engineer.

Monitoring: City
of Newark Public
Works
Department
Public Works
Department shall
confirm that the
recommendations of
the Project
geotechnical report
are incorporated in
grading and building
plans
At grading
and building
permit plan
check.

Hazards and Hazardous Materials
HAZ-1 Prior to the issuance of a grading permit, the applicant shall address for any lot which overlaps or is within the boundary of the any recognized environmental condition (REC) on the project site, per the direction and to the satisfaction of as validated by the applicable regulatory agency/ies (e.g. San Monitoring: City
of Newark
Community
Development
Department
Community
Development
Department shall
review the evidence
provided by the
At grading
and building
permit plan
check.

Packet Page 2462
Cedar Boulevard Residential Development
38288-38594 Cedar Boulevard
Mitigation Monitoring & Reporting Program
City of Newark December 2022
Cedar Boulevard Residential Development Page 4
Avoidance/Mitigation Measures
Mitigation and
Monitoring
Responsibility
Monitoring Action Schedule
Francisco Regional Quality Control Board (SFRQCB), Alameda County Water District (ACWD), Alameda County Department of Environmental Health) the applicant shall provide evidence that demonstrates that the REC has been resolved to the satisfaction of the applicable regulatory agencies for future residential land use and retain the services of a qualified professional to prepare a Risk Management Plan (RMP), which shall establish protocols and measures to address known and presently unknown environmental conditions, to be
implemented during site preparation and grading activities, under the approving agency’s oversight at the applicant’s cost.

The applicant shall provide evidence to the City of Newark that demonstrates that the mitigation measure is implemented to the satisfaction of the applicable regulatory agency/ies. applicant and
confirm
implementation of
Mitigation Measure
HAZ-1 that the REC
has been resolved to
the satisfaction of the
applicable regulatory
agencies for future
residential land use
Tribal Cultural Resources
TC-1 Cultural resource representatives for the Confederated Villages of Lisjan Tribe shall be notified within 24 hours in the event of an unanticipated discovery of potential tribal cultural resources or if human remains are found during construction and Mitigation Measure CUL-1 pertaining to cultural
resources shall apply as follows:
“During project construction, if historic, archaeological or Native American materials or artifacts are identified, work within 50 foot radius of such find shall cease and the City shall retain the services of a qualified archeologist and/or
paleontologist to assess the significance of the find. If such find is determined to be significant by the archeologist and/or paleontologist, a resource protection plan conforming to CEQA Section 15064.5 shall be prepared by the archeologist and/or paleontologist and approved by the Community Development Director. The plan may include, but would not be limited to, removal of resources and similar actions. Project work may be resumed in compliance with such plan. If human remains are encountered, all ground disturbing activities near or in any area potentially overlying adjacent human remains shall cease, the County Coroner shall be contacted immediately, and the provisions of State law carried out.”
Monitoring: City
of Newark
Community
Development
Department
Cultural resource
representatives for
the Confederated
Villages of Lisjan
Tribe shall be notified
within 24 hours in
the event of an
unanticipated
discovery of potential
tribal cultural
resources or human
remains during
construction are
found during
construction
During
construction
Packet Page 2463

CEDAR BOULEVARD RESIDENTIAL DEVELOPMENT
Response to Comments on the Draft Initial Study &
Mitigated Negative Declaration
(SCH # 2022120529)
Prepared By
City Of Newark
Community Development Department, Planning
37101 Newark Boulevard
Newark, CA 94560
Contact: Carmelisa Lopez, Senior Planner
Prepared with the assistance of
M-Group
51 East Campbell Avenue, #1247
Campbell, CA 95009
May 2023
Introduction

EXHIBIT G
Packet Page 2464
This document provides responses to written comments received following circulation of the Public Draft Initial Study/Mitigated Negative Declaration (IS/MND) prepared for the Cedar Boulevard Residential Development Project (hereinafter referred to collectively as the “project”) (State Clearinghouse # 2022120529).

In accordance with the California Environmental Quality Act (CEQA) of 1970 (as amended) (California Public Resources Code 21000 et. seq.), the IS/MND was circulated for a 30-day public review and comment period from December 21, 2022, to January 20, 2023, and subsequently for a 20-day review and comment period from April 11, 2023 to May 1, 2023 to fulfill the requirements of CEQA Guidelines Section 15072.

The IS/MND identifies the likely environmental consequences associated with implementation of the proposed project and recommends mitigation measures to reduce potentially significant impacts.

This Response to Comments document identifies comments received relating to environmental concerns, and the responses provided herein address issues raised by the comments received and clarify information provided in the Draft IS/MND. This response to comments document along with the Draft IS/MND constitutes the Final IS/MND.

CEQA REQUIREMENTS
CEQA Guidelines Section 15074 identifies the responsibilities of the Lead Agency when considering the adoption of a Negative Declaration or Mitigated Negative Declaration:
(a) Any advisory body of a public agency making a recommendation to the decision-making body shall consider the proposed negative declaration or mitigated negative declaration before making its recommendation.
(b) Prior to approving a project, the decision-making body of the lead agency shall consider the proposed negative declaration or mitigated negative declaration together with any comments received during the public review process. The decision-making body shall adopt the proposed negative declaration or mitigated negative declaration only if it finds on the basis of the whole record before it (including the initial study and any comments received), that there is no substantial evidence1
that the project will have a significant effect on the environment and that the negative declaration or mitigated negative declaration reflects the lead agency’s independent judgment and analysis.

Consistent with CEQA requirements, the City of Newark has reviewed and considered all comments received on the IS/MND. The CEQA does not require formal responses to comments on an IS/MND, but instead requires that the lead agency considers the comments received (CEQA Guidelines Section 15074(b)). Nonetheless, responses to the comments are included in this document to provide a complete environmental record.

One comment letter from the California Department of Transportation (Caltrans) and one comment letter from the Alameda County Water District (ACWD) were received upon circulation of the Public Draft IS/MND. The following table summarizes each comment in these letters and provides the City’s written responses. Copies of the comment letters are attached after the table. 1 “Substantial evidence” includes facts, fact-related reasonable assumptions, and expert opinions based on facts. It does not include arguments, speculation, unsubstantiated opinion or narrative, clearly inaccurate or erroneous evidence, or socioeconomic impacts not related to the physical environment. (Pub. Res. Code Secs. 21080(e), 21082.2(c); Guidelines § 15384).

Packet Page 2465
California Department of Transportation (Caltrans) Response Landscaping:

This proposed project is located directly adjacent to a section of the Classified Landscaped Freeway, with ornamental vegetation planting that meets the criteria established by the California Code of Regulations, Outdoor Advertising Regulations, Title 4, Division 6.

The rear of the property currently consists of a chain link fence with vines growing on it to create a visual separation between I-880 and the property. There is also planting and irrigation in between the existing guardrail and the fence. To maintain the Classified Landscaped Freeway status, please maintain the existing planting and irrigation within Caltrans’ Right-of-Way (ROW).

This comment has been noted and will be taken into
account by the project applicant and City staff should
there be a potential for site improvements to impact
ornamental plantings within the Caltrans’ Right of
Way (ROW) adjacent to the project site. As such, the
proposed project proposes landscape improvements
within the boundaries of the project site and no
revisions to the IS-MND are necessary in response to
this comment.

Landscaping:

The project also proposes to install an 18-feet high masonry/sound wall along the rear of the property, adjacent to I-880. To maintain a consistent design along the I-880 corridor, the masonry/sound wall should match and complement the existing walls along the I-880 corridor.

The design of the retaining wall is subject to design
review. This comment has been noted and will be
taken into account by City staff during that process.

No revisions to the IS-MND are necessary in response
to this comment.

Lead Agency:

As the Lead Agency, the City of Newark is responsible for all project mitigation, including any needed improvements to the State Transportation Network (STN). The project’s fair share contribution, financing, scheduling, implementation responsibilities and lead agency monitoring should be fully discussed for all proposed mitigation measures.

This comment has been noted and will be taken into
account by City staff should there be any
improvements needed to the STN related to the
project. As such, the project does not require any
mitigation that will need improvements to the State
Transportation Network (STN). No revisions to the ISMND are necessary in response to this comment.

Encroachment Permit:

Please be advised that any permanent work or temporary traffic control that encroaches onto Caltrans’ ROW requires a Caltransissued encroachment permit. As part of the encroachment permit submittal process, you may be asked by the Office of Encroachment Permits to submit a completed encroachment permit application package, digital set of plans clearly delineating Caltrans’ ROW, digital copy of signed, dated and stamped (include stamp expiration date) traffic control plans, this comment letter, your response to the comment letter, and where applicable, the following items: new or amended Maintenance Agreement (MA), approved Design
Standard Decision Document (DSDD), approved encroachment exception request, and/or airspace lease agreement. Your application package may be emailed to [email protected].

Please note that Caltrans is in the process of implementing an online, automated, and milestone-based Caltrans Encroachment Permit System (CEPS) to replace the current permit application submittal process with a fully electronic system, including online payments. The new system is expected to be available during 2023.

To obtain information about the most current encroachment permit process and to download the permit application, please visit:
https://dot.ca.gov/programs/traffic-operations/ep/applications.

This comment has been noted and will be taken into
account by the project applicant and City staff in the
event of temporary traffic control or permanent
work in the Caltrans’s ROW. No revisions to the ISMND are necessary in response to this comment.

Packet Page 2466
Alameda County Water District (ACWD) Response
Groundwater Protection
ACWD requests that the following potentially significant impacts to the protection of groundwater be addressed by the draft IS/MND:
a. Groundwater Well Destruction and Drilling Permits:
i. As required by ACWD Ordinance No. 2010-01, drilling
permits are required prior to the start of any subsurface drilling activities for wells, exploratory holes, and other excavations (including the installation of support piers, piles, or caissons) within the City of Newark. Application for a permit may be obtained from ACWD’s Engineering
Department at 43885 South Grimmer Boulevard, Fremont,
or online at http://www.acwd.org. Before a permit is
issued, a cash or check deposit is required in a sufficient sum to cover the fee for issuance of the permit or charges for field investigation and inspection. All permitted work requires scheduling for inspection; therefore, all drilling activities must be coordinated with ACWD prior to the start of any field work.
ii. ACWD has identified at least one water well and a number of monitoring wells located within or adjacent to the
Project area. In order to protect the groundwater basin, each well located within the Project area must be in
compliance with ACWD Ordinance No. 2010-01 and must
be either protected or properly destroyed prior to or
during construction activities. If the well(s) are to remain, a letter indicating so must be sent to ACWD.

If the well(s) are: 1) no longer required by any regulatory agency; 2) no longer monitored on a regular basis; or 3) damaged, lost, or the surface seal is jeopardized in any way during the construction process, the wells must be
destroyed in accordance with ACWD requirements.

The City acknowledges the need to protect and abandon
the wells on the project site in accordance with ACWD
requirements, including obtaining the requisite permit(s) from ACWD for groundwater well destruction/
abandonment and/or drilling/excavation. These
requirements have been noted and will be taken into
account by the applicant. No revisions to the IS/MND are necessary in response to this comment.
b. Hazards and Hazardous Materials:

Ramboll US Consulting, Inc.’s Phase I Environmental Site Assessment (Phase I), dated June 20, 2022, identified a portion of 38370 Cedar Boulevard as a recognized
environmental condition (REC) due to the address’
association with an open Leaking Underground Fuel Tank
(LUFT) case. The draft IS/MND addressed this REC in
Mitigation Measure HAZ-1. However, it should be noted
that the Phase I also documented the presence of a usedoil above ground storage tank (AST), drums containing petroleum and other unknown material, and/or ground
staining (unrelated to the LUFT case) at 38370 Cedar
Boulevard, as well as other addresses within the
boundaries of the proposed redevelopment. Proper
The Hazards and Hazardous Material Setting discussion
on page 63 of the IS/MND is hereby modified to include
the following text as the last paragraph of this section:

The Phase I ESA also acknowledges the presence of
hazardous materials unrelated to the LUFT cases on the
project site, such as a used oil above ground storage tank (AST) on 38370 Cedar Boulevard and containers of
petroleum and other materials such as carbon filters, at various locations on the project site including the area shown in blue on Figure 5 where the Phase I ESA states
that there are no historical or current regulatory cases but the area is under review by Regional Water Quality
Packet Page 2467
disposal of regulated or hazardous materials and the
closure of facilities that generate/store these materials must be conducted and overseen by the appropriate
regulatory agency (e.g., Alameda County Environmental
Health) prior to grading activities. Any evidence of an unauthorized release discovered should be reported to the San Francisco Bay Regional Water Quality Control Board
(Regional Board), City of Newark, and ACWD immediately.

In addition, in a letter dated March 21, 2023, the Regional Board stated that soil with reported polychlorinated
biphenyls concentrations exceeding the Regional Board’s Residential Environmental Screening Level should be
removed during redevelopment activities and discussed in a risk management plan (RMP). The RMP should contain
procedures that will be followed if impacted media is
disturbed or unknown environmental conditions are
encountered during redevelopment activities. The
Regional Board’s letter excluded the addresses 38288
Cedar Boulevard and 38370 Cedar Boulevard, because
they are currently open LUFT cases. However, since the
Phase I report indicated that potential environmental
issues may exist at these two addresses that are unrelated to the former underground storage tanks, the RMP should be applied to the entire Project area.

Control Board (RWQCB). As such, Mitigation Measure
HAZ-1 is included to address the disposition of hazardous materials that are existing or may be discovered on the project site.

Revised language is provided below to clarify Mitigation Measure HAZ-1 on page 67 of the IS/MND (Deleted text
is shown in strikethrough text and inserted text is shown in underlined text):

HAZ-1 Prior to the issuance of a grading permit, the
applicant shall address for any lot which overlaps or is within the boundary of the any recognized environmental condition (REC) on the project site, per the direction and to the satisfaction of as validated by the applicable
regulatory agency/ies (e.g. San Francisco Regional Quality Control Board (SFRQCB), Alameda County Water District
(ACWD), Alameda County Department of Environmental
Health) the applicant shall provide evidence that
demonstrates that the REC has been resolved to the
satisfaction of the applicable regulatory agencies for
future residential land use and retain the services of a qualified professional to prepare a Risk Management Plan (RMP), which shall establish protocols and measures to
address known and presently unknown environmental
conditions, to be implemented during site preparation
and grading activities, under the approving agency’s
oversight at the applicant’s cost. The applicant shall
provide evidence to the City of Newark that demonstrates that the mitigation measure is implemented to the
satisfaction of the applicable regulatory agency/ies.
c. Stormwater Management:

Pages 10, 11, 74, and 115 of the draft IS/MND state that four of the proposed open space areas on site would
include bioretention areas for stormwater. ACWD
appreciates the biotreatment of stormwater in
bioretention areas to impede runoff from rapidly
infiltrating the subsurface and bypass soils which have the capacity to remove pollutants and protect the
groundwater supply. In order to protect the groundwater basin, ACWD provides the following comments regarding
onsite stormwater management:
i. To protect the groundwater supply, the proposed
stormwater system and treatment measures should be
carefully evaluated. Because the Project is located near one of ACWD’s water supply wells (i.e., Bellflower), as well as in a wellhead protection area within the groundwater basin, the types of pollutants, loading, and the proposed
treatment measures could present an unacceptable longterm risk to beneficial uses of groundwater. Therefore, the land use is critical in determining what kind of stormwater system and treatment measure requirements are
appropriate.

As indicated on page 73 of the IS/MND, the project would be subject to the National Pollutant Discharge Elimination System (NPDES) C.3 requirements of the Municipal
Regional Stormwater Permit (MRP). Provision C.3
requires source control, site design, and stormwater
treatment measures to address stormwater pollutants. A
condition of approval ‘nn’ for the project, requires that the Stormwater Treatment Plan complies with the
Municipal Regional Stormwater NPDES Permit (MRP).

Alameda County C.3 Stormwater Technical Guidance,
which is a handbook supporting the MRP, discusses the
use of an impermeable liner and placement of an
Packet Page 2468
underdrain on top of the liner to prevent infiltration if there is less than 5-ft separation between the bottom of the stormwater facility and the seasonal high
groundwater elevation. This is an acceptable county-wide practice in eliminating potential pollutants from entering the groundwater that would be applicable to the project.

Additionally, condition of approval “ddd” for the project requires that all improvement plans are reviewed and
approved by the Alameda County Water District (ACWD)
along with other applicable regulatory agencies where
the applicant is solely responsible for any modifications to the site design provided with the vesting tentative map as necessary to satisfy requirements from the agencies. No revisions to the IS/MND are necessary in response to this comment.
ii. Page 74 of the draft IS/MND states, “The proposed project would include 10,887 square feet of landscape area
including bioretention that would result in some
groundwater recharge. Therefore, the proposed project
would not impact groundwater supplies or recharge
adversely and, thus, would not impede sustainable
groundwater management of the Niles Cones basin.”
Please note that loss of groundwater supply is not the only sustainability indicator for sustainable groundwater
management; water quality degradation is also a
sustainability indicator. Since there is known and potential soil and groundwater contamination present within the
Project boundaries, the proposed locations of the
bioretention should be fully evaluated in terms of
preventing any groundwater quality degradation, adverse impacts to groundwater supplies, and movement of the
onsite groundwater contaminant plume. Therefore, ACWD
requests the draft IS/MND evaluate the proposed locations of the bioretention in relation to known soil or
groundwater impacts and include a requirement that
Project proponents coordinate the design and installation of the bioretention with ACWD.

The Phase I Environmental Site Assessment (ESA)
prepared for the project and included as an appendix
(Appendix 5) to the IS/MND discusses the soil and
groundwater conditions on the project site and indicates that groundwater contamination on the project site is
primarily limited to the former underground storage tank (UST) area in a portion of 38370 Cedar Boulevard that is part of the project site. On page 2, the assessment states, “No migration of this impact has occurred since
groundwater monitoring activities began in 1989.” The
proposed location of the bioretention areas on the
project site is away from the area of groundwater
contamination, shown in red in the attached exhibit
(Exhibit A). The location of the area of groundwater
contamination is not anticipated to have significant
impact on groundwater quality because contamination
on the site is localized and away from the proposed
bioretention areas. Further, the improvement plans for
the project would include the proposed bioretention
areas and are required to be reviewed and approved by
the ACWD per condition of approval “ddd”. Therefore, no revisions to the IS/MND are necessary in response to this comment.

Subsequent to the submittal of the Comment Letter, the
City conducted a meeting with ACWD representatives on
April 27, 2023, to discuss the ACWD’s concerns regarding the proposed bioretention areas expressed in the letter and the City’s proposed approach to addressing those
concerns. This response and the response to Comment c.i in the Comment Letter reflect the discussion during this meeting.

Utilities and Service Systems
ACWD requests that the following potentially significant impacts to the existing water infrastructure be addressed by the draft IS/MND:

Packet Page 2469
a. ACWD operates an existing 12-inch asbestos-cement
pipeline (ACP) in the back of the Project site, fronting Highway 880, which will need to be relocated to meet
ACWD clearance requirements to the existing PG&E 24-
inch gas transmission pipeline and proposed Union
Sanitary District (USD) sanitary sewer pipelines. The
relocated 12-inch pipeline shall be welded steel pipe (WSP) and tie-in to existing 12-inch mains in Cedar Boulevard (two locations) as well as the existing 8-inch crossing near the Alameda County Flood Control crossing along the
southern property line.
i. Additional pipelines and connections to existing
pipelines, including within Cedar Boulevard, may be
required in order to restore a continuous 12-inch
pipeline extension through and/or fronting the
Project site. ACWD recommends Project proponents
contact ACWD’s Engineering Department,
Development Services Division, to discuss the Project
requirements early in the Project design process.

This comment has been noted. Since it does not pertain
to potential environmental effects of the proposed
project, no revisions to the IS/MND are necessary in
response to this comment.
b. Existing Hazardous Material Contamination: The ability to install a public water system within the Project area would be conditioned upon confirmation that the soil,
groundwater, and/or soil gas vapors do not pose a risk to the health and safety of workers either during installation of the public water system or during its long-term routine operation and maintenance.

The public water system extension and all appurtenances must be constructed in "clean corridors," which would be assured by either further testing of native soil,
groundwater, and/or soil vapors along the proposed public water system alignments or by use of clean imported fill as backfill for all trenches excavated for any part of the public water system. The use of upgraded materials, including but not limited to all steel pipelines with upgraded gaskets, may be required.

The project’s public water lines are proposed to be
installed within public and private street pavement. City standard details require clean import trench backfill
material for utility trench proposed in private and public street pavements. Native soils or materials are not
permitted to be used for trench backfill. As such, no
revisions to the IS-MND are necessary in response to this comment.
c. ACWD should be listed as a permitting agency and that the Project proponent will need to coordinate with ACWD for all required ACWD permits.

This comment has been noted. Since it does not pertain
to potential environmental effects of the proposed
project, no revisions to the IS/MND are necessary in
response to this comment.
d. The Project shall be designed to implement water-efficient plumbing fixtures and irrigation systems at both residential and non-residential developments, including but not
limited to those listed in the Water Efficiency Measures for New Development, located on the District’s website
(http://acwd.org/DocumentCenter/View/421).

This comment has been noted and will be taken into
account by the applicant. As such, as indicated in the
IS/MND, the project would be subject to CALGreen
standards that require new residential and commercial
buildings to comply with mandatory measures under five
topic areas: planning and design; energy efficiency; water efficiency and conservation; material conservation and
resource efficiency; and environmental quality. No
revisions to the IS/MND are necessary in response to this comment.

Packet Page 2470

PROPOSED SITE REDEVELOPMENT MAP
EW-1
MW-9
MW-8
MW-7
MW-6
MW-5
MW-4
MW-3
MW-1
MW-3R MW-5R
MW-1R
MW-4R MW-12
MW-11
MW-10
SV53 SV52
SV50
SV49
SV48
SV47
SV46
SV51B
SV54
LEGEND
Site BoundaryFormer USTs at 38370 CedarBoulevard
Soil Vapor Well LocationExisting Monitoring WellsApproximate Location ofReplacement Monitoring Wells FIGURE 2
RAMBOLL US CONSULTING, INC.

A RAMBOLL COMPANY
08 40 0
Feet
PROJECT: 1690019190-002 | DATED: 6/16/2022 | DESIGNER: RMSO C:\Users\rmso\OneDrive - Ramboll\Desktop\drawing1\1690019190-002\1690019190-200-Monitoring Well Map_SPzone403-2.mxd Freitas Site
38288-38594 Cedar Boulevard
Newark, California
38288 Cedar Blvd: Case closure by ACWD is pending 60 day public comment period.

Location of Impacted Groundwater at 38370 Cedar Boulevard 38370 Cedar Blvd: Open regulatory case; additional groundwater remediation and monitoring required in red shaded area
38424 - 38594 Cedar Blvd and Eastern Portion of 38370 Cedar Blvd:No current or historical regulatory cases. Ramboll will submitvoluntary oversight application to RWQCB for this portion of site andrequest no further action.

EXHIBIT
A
Bioretention Area
1 W-5
Bioretention Area
Shallow Groundwater Impacted Area
W
d
MW-1
Silva Cell(Underground Bioretention Area)
Packet Page 2471
“Provide a safe and reliable transportation network that serves all people and respects the environment” DISTRICT 4

OFFICE OF REGIONAL AND COMMUNITY PLANNING
P.O. BOX 23660, MS–10D | OAKLAND, CA 94623-0660
www.dot.ca.gov
January 25, 2023 SCH #: 2022120529
GTS #: 04-ALA-2022-00699
GTS ID: 28478
Co/Rt/Pm: ALA/880/7.7
Carmelisa Lopez, Senior Planner
City of Newark
37101 Newark Blvd
Newark, CA 94560
Re: Cedar Boulevard Residential Development – Initial Study/Mitigated Negative Declaration (IS/MND)
Dear Carmelisa Lopez:

Thank you for including the California Department of Transportation (Caltrans) in the environmental review process for the Cedar Boulevard Residential Development project. We are committed to ensuring that impacts to the State’s multimodal transportation system and to our natural environment are identified and mitigated to support a safe, sustainable, integrated and efficient transportation system. The following comments are based on our review of the December 2022 IS/MND.

Project Understanding
The proposed project would rezone a 7.76-acre site to Residential Medium DensityPlanned Residential overlay, subdivide the site to create 124 lots, and redevelop the project site with a residential development containing 118 units, incorporating single family residences and two-unit attached townhouses. This project site is located directly adjacent to I-880.

Landscape Architecture
This proposed project is located directly adjacent to a section of the Classified Landscaped Freeway, with ornamental vegetation planting that meets the criteria established by the California Code of Regulations, Outdoor Advertising Regulations, Title 4, Division 6. The rear of the property currently consists of a chain link fence with vines growing on it to create a visual separation between I-880 and the property.

There is also planting and irrigation in between the existing guardrail and the fence. To maintain the Classified Landscaped Freeway status, please maintain the existing planting and irrigation within Caltrans’ Right-of-Way (ROW).

Packet Page 2472
Carmelisa Lopez, Senior Planner
January 25, 2023

Page 2 ends

“Provide a safe and reliable transportation network that serves all people and respects the environment” The project also proposes to install an 18-feet high masonry/sound wall along the rear of the property, adjacent to I-880. To maintain a consistent design along the I-880 corridor, the masonry/sound wall should match and complement the existing walls along the I-880 corridor.

Lead Agency
As the Lead Agency, the City of Newark is responsible for all project mitigation, including any needed improvements to the State Transportation Network (STN). The project’s fair share contribution, financing, scheduling, implementation responsibilities and lead agency monitoring should be fully discussed for all proposed mitigation measures.

Encroachment Permit
Please be advised that any permanent work or temporary traffic control that encroaches onto Caltrans’ ROW requires a Caltrans-issued encroachment permit. As part of the encroachment permit submittal process, you may be asked by the Office of Encroachment Permits to submit a completed encroachment permit application package, digital set of plans clearly delineating Caltrans’ ROW, digital copy of signed, dated and stamped (include stamp expiration date) traffic control plans, this comment letter, your response to the comment letter, and where applicable, the following items: new or amended Maintenance Agreement (MA), approved Design Standard Decision Document (DSDD), approved encroachment exception request, and/or airspace lease agreement. Your application package may be emailed to [email protected].

Please note that Caltrans is in the process of implementing an online, automated, and milestone-based Caltrans Encroachment Permit System (CEPS) to replace the current permit application submittal process with a fully electronic system, including online payments. The new system is expected to be available during 2023. To obtain information about the most current encroachment permit process and to download the permit application, please visit https://dot.ca.gov/programs/trafficoperations/ep/applications.

Packet Page 2473
Carmelisa Lopez, Senior Planner
January 25, 2023

Page 3 ends

“Provide a safe and reliable transportation network that serves all people and respects the environment” Thank you again for including Caltrans in the environmental review process. Should you have any questions regarding this letter, or for future notifications and requests for review of new projects, please email [email protected].

Sincerely,

MARK LEONG
District Branch Chief
Local Development Review
c: State Clearinghouse
Packet Page 2474
April 20, 2023

VIA ELECTRONIC MAIL
Carmelisa Lopez, Senior Planner ([email protected]) Community Development Department
City of Newark
37101 Newark Boulevard
Newark, CA 94560
Dear Ms. Lopez:

Subject: Notice of Intent to Adopt a Mitigated Negative Declaration for the Cedar Boulevard Residential Development Project
Alameda County Water District (ACWD wishes to thank you for the opportunity to comment on the draft Initial Study/Mitigated Negative Declaration (IS/MND) for the Cedar Boulevard Residential Development Project (Project). ACWD staff has reviewed the draft IS/MND and offers the following comments for your consideration:

1. Groundwater Protection: ACWD requests that the following potentially significant impacts to the protection of groundwater be addressed by the draft IS/MND:
a. Groundwater Well Destruction and Drilling Permits:
i. As required by ACWD Ordinance No. 2010-01, drilling permits are required prior to the start of any subsurface drilling activities for wells, exploratory holes, and other excavations (including the installation of support piers, piles, or caissons) within the City of Newark. Application for a permit may be obtained from ACWD’s Engineering Department at 43885 South Grimmer Boulevard, Fremont, or online at http://www.acwd.org. Before a permit is issued, a cash or check deposit is required in a sufficient sum to cover the fee for issuance of the permit or charges for field investigation and inspection. All permitted work requires scheduling for inspection; therefore, all drilling activities must be coordinated with ACWD prior to the start of any field work.
ii. ACWD has identified at least one water well and a number of monitoring wells located within or adjacent to the Project area. In order to protect the groundwater basin, each well located within the Project area must be in compliance with ACWD Ordinance No. 2010-01 and must be either protected or properly destroyed prior to or during construction activities. If the well(s) are to remain, a letter indicating so must be sent to ACWD.

Packet Page 2475
Ms. Carmelisa Lopez

Page 2 ends

April 20, 2023
If the well(s) are: 1) no longer required by any regulatory agency; 2) no longer monitored on a regular basis; or 3) damaged, lost, or the surface seal is jeopardized in any way during the construction process, the wells must be destroyed in accordance with ACWD requirements.
b. Hazards and Hazardous Materials: Ramboll US Consulting, Inc.’s Phase I Environmental Site Assessment (Phase I), dated June 20, 2022, identified a portion of 38370 Cedar Boulevard as a recognized environmental condition (REC) due to the address’ association with an open Leaking Underground Fuel Tank (LUFT) case. The draft IS/MND addressed this REC in Mitigation Measure HAZ-1. However, it should be noted that the Phase I also documented the presence of a used-oil above ground storage tank (AST), drums containing petroleum and other unknown material, and/or ground staining (unrelated to the LUFT case) at 38370 Cedar Boulevard, as well as other addresses within the boundaries of the proposed redevelopment. Proper disposal of regulated or hazardous materials and the closure of facilities that generate/store these materials must be conducted and overseen by the appropriate regulatory agency (e.g., Alameda County Environmental Health) prior to grading activities. Any evidence of an unauthorized release discovered should be reported to the San Francisco Bay Regional Water Quality Control Board (Regional Board), City of Newark, and ACWD immediately.

In addition, in a letter dated March 21, 2023, the Regional Board stated that soil with reported polychlorinated biphenyls concentrations exceeding the Regional Board’s Residential Environmental Screening Level should be removed during redevelopment activities and discussed in a risk management plan (RMP). The RMP should contain procedures that will be followed if impacted media is disturbed or unknown environmental conditions are encountered during redevelopment activities. The Regional Board’s letter excluded the addresses 38288 Cedar Boulevard and 38370 Cedar Boulevard, because they are currently open LUFT cases. However, since the Phase I report indicated that potential environmental issues may exist at these two addresses that are unrelated to the former underground storage tanks, the RMP should be applied to the entire Project area. c. Stormwater Management: Pages 10, 11, 74, and 115 of the draft IS/MND state that four of the proposed open space areas on site would include bioretention areas for stormwater.

ACWD appreciates the biotreatment of stormwater in bioretention areas to impede runoff from rapidly infiltrating the subsurface and bypass soils which have the capacity to remove pollutants and protect the groundwater supply. In order to protect the groundwater basin, ACWD provides the following comments regarding onsite stormwater management:
i. To protect the groundwater supply, the proposed stormwater system and treatment measures should be carefully evaluated. Because the Project is located near one of ACWD’s water supply wells (i.e., Bellflower), as well as in a wellhead protection area within the groundwater basin, the types of pollutants, loading, and the proposed treatment measures could present an unacceptable long-term risk to beneficial uses of groundwater. Therefore, the land use is critical in determining what kind of stormwater system and treatment measure requirements are appropriate. ii. Page 74 of the draft IS/MND states, “The proposed project would include 10,887 square feet of landscape area including bioretention that would result in some groundwater recharge. Therefore, the proposed project would not impact groundwater supplies or recharge adversely and, thus, would not impede sustainable groundwater Packet Page 2476
Ms. Carmelisa Lopez

Page 3 ends

April 20, 2023
management of the Niles Cones basin.” Please note that loss of groundwater supply is not the only sustainability indicator for sustainable groundwater management; water quality degradation is also a sustainability indicator. Since there is known and potential soil and groundwater contamination present within the Project boundaries, the proposed locations of the bioretention should be fully evaluated in terms of preventing any groundwater quality degradation, adverse impacts to groundwater supplies, and movement of the onsite groundwater contaminant plume. Therefore, ACWD requests the draft IS/MND evaluate the proposed locations of the bioretention in relation to known soil or groundwater impacts and include a requirement that Project proponents coordinate the design and installation of the bioretention with ACWD.

2. Utilities and Service Systems: ACWD requests that the following potentially significant impacts to the existing water infrastructure be addressed by the draft IS/MND:
a. ACWD operates an existing 12-inch asbestos-cement pipeline (ACP) in the back of the Project site, fronting Highway 880, which will need to be relocated to meet ACWD clearance requirements to the existing PG&E 24-inch gas transmission pipeline and proposed Union Sanitary District (USD) sanitary sewer pipelines. The relocated 12-inch pipeline shall be welded steel pipe (WSP) and tie-in to existing 12-inch mains in Cedar Boulevard (two locations) as well as the existing 8-inch crossing near the Alameda County Flood Control crossing along the southern property line. i. Additional pipelines and connections to existing pipelines, including within Cedar Boulevard, may be required in order to restore a continuous 12-inch pipeline extension through and/or fronting the Project site. ACWD recommends Project proponents contact ACWD’s Engineering Department, Development Services Division, to discuss the Project requirements early in the Project design process. b. Existing Hazardous Material Contamination: The ability to install a public water system within the Project area would be conditioned upon confirmation that the soil, groundwater, and/or soil gas vapors do not pose a risk to the health and safety of workers either during installation of the public water system or during its long-term routine operation and maintenance.

The public water system extension and all appurtenances must be constructed in "clean corridors," which would be assured by either further testing of native soil, groundwater, and/or soil vapors along the proposed public water system alignments or by use of clean imported fill as backfill for all trenches excavated for any part of the public water system. The use of upgraded materials, including but not limited to all steel pipelines with upgraded gaskets, may be required.
c. ACWD should be listed as a permitting agency and that the Project proponent will need to coordinate with ACWD for all required ACWD permits.
d. The Project shall be designed to implement water-efficient plumbing fixtures and irrigation systems at both residential and non-residential developments, including but not limited to those listed in the Water Efficiency Measures for New Development, located on the District’s website (http://acwd.org/DocumentCenter/View/421).

Packet Page 2477
Ms. Carmelisa Lopez

Page 4 ends

April 20, 2023

3. ACWD Contacts:

The following ACWD contacts are provided so that the City of Newark staff can coordinate with ACWD as needed during the Project:
ƒ Michelle Walden, Groundwater Resources Manager, at (510) 668-4454 or by email at [email protected], for coordination regarding ACWD’s groundwater resources. ƒ Kit Soo, Well Ordinance Supervisor, at (510) 668-4455 or by email at [email protected], for coordination regarding groundwater wells and drilling permits. ƒ Sean O’Reilly, Development Services Manager, at (510) 668-4472 or by email at [email protected], for coordination regarding public water systems and water service.

Again, thank you for the opportunity to comment on the draft Initial Study/Mitigated Negative Declaration for the Cedar Boulevard Residential Development Project.

Sincerely,
Laura J. Hidas
Director of Water Resources
al/sro/tn
cc: Michelle Walden, ACWD
Kit Soo, ACWD
Sean O’Reilly, ACWD
Packet Page 2478
ORDINANCE NO. ______

ORDINANCE OF THE CITY COUNCIL OF THE CITY OF

NEWARK ESTABLISHING A PLANNED DEVELOPMENT
OVERLAY DISTRICT AT 38288-38594 CEDAR BOULEVARD
(APNS 92A-2375-002-06, 92A-2375-022-01)
WHEREAS, Robson Homes LLC (the “Applicant”), has filed with the City of Newark an application for a Planned Development Overlay District, a Planned Development Plan, Design Review, a Minor Use Permit, and a Vesting Tentative Map to construct a 118-unit residential development comprised of single-family residences and two-unit attached townhouses (duets) on a 7.76-acre site located at 38288-38594 Cedar Boulevard (APNs 92A-2375-002-06, 92A-2375- 022-01) (the “Property”) (the “Project” as illustrated in Exhibit D); and WHEREAS, the Applicant proposes to demolish the existing buildings and site improvements; and
WHEREAS, the Property is a 7.76-acre property consisting of four legal lots that has a General Plan Land Use designation of Medium Density Residential and is currently zoned RM Residential Medium Density (“RM”); and
WHEREAS, the Applicant requests a Planned Development Overlay District and Planned Development Plan because the proposed project deviates from some of the RM zoning district development standards and parking standards in NMC Section 17.07.030 and NMC Chapter

17.23, respectively; and
WHEREAS, pursuant to and in accordance with the provisions of the California Environmental Quality Act (Public Resources Code Sections 21000 et seq) herein referred to as “CEQA”), the State of California Guidelines for the Implementation of the California Environmental Quality Act (commencing with Section 15000 of Title 14 of the California Code of Regulations; herein referred to as the “CEQA Guidelines”), the City is the “lead agency” for the preparation and consideration of environmental documents for the Project; and WHEREAS, staff retained the services of M-Group to prepare an Initial Study (“IS”) for the project in accordance with the California Environmental Quality Act (CEQA) Guidelines Section 15063. The IS examined the nature and extent of potentially adverse effects on the environment that could occur if the project is approved and implemented; and WHEREAS, staff has reviewed the IS for the project and based upon substantial evidence in the record, find that all potentially significant effects of the project, as identified in the IS, can and will be avoided or mitigated to a less than significant level by project revisions or other requirements imposed on the project; and
WHEREAS, based on the review and pursuant to Public Resources Code Section 21080(c)(2) and CEQA Guidelines Section 15070, the City has prepared a Mitigated Negative Declaration (“MND”) for the Project. An MND is a statement by the City that the project will not have a significant effect on the environment if the project incorporates revisions (mitigation Packet Page 2479
measures) identified during the environmental review; and WHEREAS, when an IS/MND is submitted to the State Clearinghouse for review by state agencies, CEQA requires a minimum review period of 30 days to circulate an MND for public review. The IS/MND was available for public review from December 21, 2022 through January 20, 2023 on the State Clearinghouse’s website, the City’s website, and City Hall and a Notice of Intent (NOI) to adopt an MND was filed on December 21, 2022 to the Alameda County Clerk.

Additionally, per CEQWA Guidelines §15072(b)(3), notices were mailed to property owners within a 500’ radius of the project site on April 11, 2023 and the IS/MND was made available for their review through May 1, 2023; and
WHEREAS, the City received comments from the California Department of Transportation (“Caltrans”) on the IS/MND during the public review period of the IS/MND.

Pursuant to CEQA Guidelines Section 15074, the City reviewed and considered all comments received on the IS/MND; and
WHEREAS, the Planning Commission held a duly noticed public hearing on March 14, 2023, and after fully considering the Project, entitlements, staff report, findings of fact, conditions of approval, public comments, and all other testimony and evidence presented at the public hearing, recommended City Council approval of the Project and adoption of the MND supported by an IS in accordance with CEQA; and
WHEREAS, pursuant to NMC Section 17.31.060, a public hearing notice was published in the Tri City Voice on April 25, 2023 and mailed as required, and the City Council held a duly noticed public hearing at which time all interested parties had an opportunity to be heard on the Project at 7:00 p.m. on May 11, 2023.

NOW, THEREFORE, the City Council of the City of Newark does ordain as follows:

Section 1: That the foregoing recitals are true and correct and hereby made part of this Ordinance.

Section 2: The City Council of the City of Newark does hereby find, based on the IS for the project and substantial evidence in the record, and declare that all potentially significant effects on the environment of the zoning map amendment embodied in this ordinance can and will be avoided or mitigated to a less than significant level by project revisions or other requirements imposed on the Project. Based on the review and pursuant to Public Resources Code Section 21080(c)(2) and CEQA Guidelines Section 15070, the City has prepared an MND for the Project, a statement by the City that the project will not have a significant effect on the environment if the project incorporates revisions (mitigation measures) identified during the environmental review. The IS/MND was available for public review from December 21, 2022 through January 20, 2023 on the State Clearinghouse’s website, the City’s website, and City Hall, and on December 21, 2022, the City filed a Notice of Intent (“NOI”) to adopt an MND to the Alameda County Clerk.

Section 3: Pursuant to NMC Section 17.39.070 and Section 17.39.080, the City Council of the City of Newark does hereby find the following criteria satisfied:

A. The amendment is consistent with the general plan.

Packet Page 2480
The amendment will allow for a 118-unit residential development consisting of single-family residences and two-unit attached townhouses (duets) and associated onsite and offsite improvements. The Project will have a proposed density of 21 units per net acre which is within the 14 to 30 units per net acre density envisioned for the General Plan Medium Density Residential Land Use Designation. The Project is consistent with all applicable General Plan goals, policies, and actions as described in Exhibit A.

B. Any change in district boundaries is necessary to achieve the balance of land uses desired by the city, consistent with the general plan, and to increase the inventory of land within a given zoning district.

The proposed project does not propose a change in district boundaries, and therefore, this criterion is not applicable.

C. The amendment will promote the growth of the city in an orderly manner and to promote and protect the public health, safety, peace, comfort, and general welfare.

The zoning for the Project Site and properties north of Cedar Boulevard were rezoned to Residential Medium Density in the mid-2010’s to facilitate the conversion of the uses on these properties to residential. Since the zoning amendment was adopted, medium-density residential developments have been approved and constructed northwest of the project site along Cedar Boulevard known as Cedar Townhomes. With the exception of a few properties with existing commercial uses along Cedar Boulevard and a school and church use across from Cedar Boulevard, the project site is generally surrounded by residential uses. The Project will promote the transition from commercial to residential uses envisioned for this area. The Project also demonstrates high-quality design standards that will enhance the site and surrounding area.

Therefore, the amendment will promote the growth of the city in an orderly manner and promote and protect the public health, safety, peace, comfort, and general welfare.

Section 4: Pursuant to NMC Chapter 17.12, Section 17.39.070, and Section 17.39.080, the City Council of the City of Newark hereby makes and adopts the findings required by NMC Section

17.12.060 presented in the Resolution of the City Council of the City of Newark for approval of P2021-002, approving a Planned Development Plan, Design Review, a Minor Use Permit, and a Vesting Tentative Map and adoption of a Mitigated Negative Declaration supported by an Initial Study in accordance with the CEQA for a 118-unit residential development comprised of singlefamily residences and two-unit attached townhouses (duets) on a 7.76-acre site located at 38288- 38594 Cedar Boulevard (APNs 92A-2375-002-06, 92A-2375-022-01).

Section 5: If any section, subsection, subdivision, paragraph, sentence, clause or phrase of this Ordinance, or its application to any person or circumstance, is for any reason held to be invalid or unenforceable, such invalidity or unenforceability shall not affect the validity or enforceability of the remaining sections, subsections, subdivisions, paragraphs, sentences, clauses or phrases of this Ordinance, or its application to any other person or circumstance. The City Council of the City of Newark hereby declares that it would have adopted each section, subsection, subdivision, paragraph, sentence, clause or phrase hereof, irrespective of the fact that any one or more other sections, subsections, subdivisions, paragraphs, sentences, clauses or phrases hereof is declared invalid or unenforceable.

Packet Page 2481
Section 6: This ordinance shall take effect thirty (30) days from the date of its passage. Before the expiration of fifteen (15) days after its passage, this ordinance shall be published in The Tri-City Voice, a newspaper of general circulation published and printed in the County of Alameda and circulated in the City of Newark.

The foregoing ordinance was introduced and read before the City Council of the City of Newark by _________________________ at the regular meeting of the City Council of the City of Newark held on _________________________.

This ordinance was read at the regular meeting of the City Council held on _________________________. _________________________ moved that it be adopted and passed, which motion was duly seconded, and said ordinance was passed and adopted.

Packet Page 2482
May 25, 2023
City Council Meeting
Carmelisa Lopez, Senior Planner
Robson Homes Project
(P2021-002)
Packet Page 2483
Site Information
• 7.76-acre site located at
38288-38594 Cedar Blvd
• Bounded by a personal
storage facility, I-880, an
ACFCD channel, and Cedar
Blvd
• Surrounded by commercial,
industrial, church, school,
and residential uses

PROJECT
Church SITE
School
Industrial
Personal
Storage
Residential
Residential
Residential
Packet Page 2484
Site Information
• Site currently occupied by
auto repair and parts supply
shops
• Contains commercial
buildings and a large storage
shed
• Paved areas for circulation,
parking, and storage
Packet Page 2485
Project Proposal
• The applicant, Robson Homes, proposes a 118-unit residential development consisting of 90 single-family residences and 28 two-unit townhouses (duets) Packet Page 2486
Site Development Plan
Enhanced Elevations
Common Open Space
Private Open Space
Single-Family Home
Two-Unit Attached
Townhouse (Duet)
Packet Page 2487
Proposed Residences
Residence Type SFDs and Two-Unit Attached Townhouses
(Duets)
Floor Plans 5
Stories 3
Building Height 28’-1” to 33’-10”
Bedrooms 3 to 4
Bathrooms 3.5
Private Open Space Decks and porches
Parking Spaces Two spaces within ground floor garage
Habitable Floor Area 1,961 – 2,589 sq. ft.

Packet Page 2488
Proposed Residences
• Five primary floor plans
• 17 unique elevations SFD
Duet
Packet Page 2489
Landscaping
• Diverse palette of trees,
shrubs, and ground cover
• Planting pockets along
sidewalks and walkways
• Bioretention areas
• Street trees on both sides
of Cedar Blvd and within
on-street landscape
median
Packet Page 2490
Open Space
• Total of 44,990 sq. ft. of
open space
• Private = 11, 207 sq. ft.
• Decks and porches
within residence
• Common = 33,283 sq. ft.
• Play structures,
benches, walking
paths, dog areas,
pedestrian bridges
Packet Page 2491
Cedar Blvd Streetscape
• Residences along Cedar Blvd will be oriented toward Cedar Blvd • Streetscape will include large landscape areas, a low wall to maintain a clear distinction between the public and private realm, and a meandering sidewalk Packet Page 2492
Access & Parking
• Access will be provided via two driveways from Cedar Blvd • Private streets and courts will lead directly to two-car garage of each residence • 236 garage spaces required
• 294 spaces proposed: 236 garage spaces (two garage spaces per unit), 57 street spaces for guests
Packet Page 2493
Offsite Improvements

1. Frontage improvements on Cedar Blvd

2. Traffic signal and crosswalk improvements at the
Cedar Blvd and Smith Ave intersection

3. Traffic median improvements on Cedar Boulevard

4. Undergrounding of utilities along Cedar Blvd

5. Sidewalk extension across the adjacent public
storage property

6. Left turn queue lane extension at the corner of
Cedar Blvd and Mowry Ave

7. Bus shelter along Cedar Blvd frontage next to Lots
68 & 111
Packet Page 2494
General Plan & Zoning Code
• General Plan: Proposed residential density of 21 units per acre is permitted in the Medium Density Residential land use designation • Zoning Code: SFDs and duets are permitted in the RM Residential Medium Density zoning district
• Applicant requests deviations from some zoning regulations in order to construct project
• Entitlements Requested: Ordinance establishing a Planned Development overlay district, Design Review, Minor Use Permit, and Vesting Tentative Map
Packet Page 2495
PD Overlay District
• Applicant requests an Ordinance to establish a Planned Development (-PD) overlay district to allow for the proposed development
• Requests deviations from RM development standards and parking standards Packet Page 2496
Requested Deviations
Required Proposed
Min. Lot Size 6,000 sq. ft. 1,391 sq. ft.

Min. Lot Width 60 ft. 21 ft.

Min. Lot Depth 100 ft. 45 ft.

Min. Front Setback 20 ft. 3 ft.

Min. Interior Side Setback 5 ft. 3 ft.

Min. Street Side Setback 10 ft. 3 ft.

Min. Rear Side Setback 20 ft. 3 ft.

Min. Distance Between
Structures
10 ft. 6 ft.

Max. Lot Coverage 55 % of lot 70%
Min. Landscaping 25% of lot 16%
Private Open Space Uncovered areas only Covered decks included Parallel Parking Space
Dimensions
9 ft. x 19 ft. 8 ft. x 22 ft.

Min. Parking Drive Aisle
Width for Head-In Spaces
25 ft. 20 ft.

Packet Page 2497
Design Review
• Contemporary translation of early California
architecture (combination of traditional New
England and Spanish styles)
• Floor plans and elevations provide a variety of
massing, wall breaks, colors, and materials
• Enhanced side elevations on buildings adjacent
to the neighborhood entrances, open space
areas, and I-880
• Landscaping and open spaces areas will
complement and enhance the residences and
overall site
Packet Page 2498
Minor Use Permit for Wall Height
• Applicant requests an up to 18’ tall
sound wall along rear and side
property lines
• 18’ along rear property line
• Steps down from 18 to 10’ from
rear to front of property
• Sound wall required to meet General
Plan Policy EH-7/4 to reduce outdoor
noise levels in residential areas
• Will reduce exterior noise levels up
to 65 dB
18 FT
18 TO 10 FT
18 TO 10 FT
Packet Page 2499
Vesting Tentative Map
• Vesting Tentative Tract Map 8583
submitted to allow for 124-lot
residential subdivision
• 118 residential lots and 6 common
lots
• Lots 1-118: Residential lots
• Lot A: Private streets and courts
• Lots C-F: Common open space areas
• 5’ wide right-of-way dedication for
Cedar Blvd
Packet Page 2500
Environmental Review – IS/MND
• M-Group assisted with preparing an Initial Study (IS) for the project per CEQA Guidelines §15063
• Determined all potentially significant effects of the project can and will be avoided or mitigated to a less than significant level by project revisions or other requirements imposed on the project
• A Mitigated Negative Declaration (MND) was prepared
• Mitigation Monitoring and Reporting Program (MMRP) for project includes mitigation measures to ensure all potentially significant effects can and will be avoided or mitigated to a less than significant level Packet Page 2501
IS/MND – Public Review & Comments
• Dec. 21, 2022 to Jan. 20, 2023: Review period for state agencies and the public
• Apr. 11 to May 1, 2023: Review period for property owners within 500’ radius of the project site
• Comments received from Caltrans and ACWD
• Per CEQA Guidelines §15074, the City reviewed and considered all comments received on the IS/MND
• Minor revisions were made to the IS/MND and one of the mitigation measures in the MMRP to address the comments received
Packet Page 2502
Requested Actions

1. Adopt an Ordinance establishing a Planned Development Overlay District to allow the proposed development;

2. Design Review;

3. Minor Use Permit to allow a proposed wall up to 18 feet tall;

4. Vesting Tentative Map to create 124 lots; and

5. Adoption of a Mitigated Negative Declaration supported by an Initial Study for the proposed project in accordance with CEQA.

Packet Page 2503
Recommendation

1. Adopt an Ordinance establishing a Planned Development Overlay District at 38288-38594 Cedar Boulevard (APNs 92A-2375-002-06, 92A-2375-022-01);

2. Adopt a Resolution approving P2021-002, a Planned Development Plan, Design Review, a Minor Use Permit, and a Vesting Tentative Map for a 118-unit residential development located at 38288-38594 Cedar Boulevard (APNs 92A-2375- 002-06, 92A-2375-022-01) based on the recommended findings and subject to the recommended conditions of approval; and

3. Adopt a Mitigated Negative Declaration supported by an Initial Study in accordance with the California Environmental Quality Act for a 118-unit residential development located at 38288-38594 Cedar Boulevard (APNs 92A-2375-002-06, 92A-2375-022-01) based on the recommended findings and subject to the recommended conditions of approval.

Packet Page 2504
Click to edit Master title style
Click to edit Master title style
MAY 25, 2023

CITY OF NEWARK

CITY COUNCIL
PROJECT:

CEDAR BLVD

NEWARK, CA
118 HOMES
Packet Page 2505
2 Who We Are
Packet Page 2506
3 Context
Packet Page 2507
4 Our Vision
Packet Page 2508
5 Project Experiences
• Cedar Blvd Experience
• Pedestrian Experience
Through the Project
• Vehicular Experience
Through the Project
• 880 Experience
880 Freeway
Cedar Blvd.

Packet Page 2509
6 Experience Cedar Blvd.

A Focus on Cedar Blvd.
• Quality Materials &
Authentic Details
• Front Doors Face Street
• Decorative Brick Wall
Packet Page 2510
7 Cedar Blvd.

Experience Cedar Blvd.
880 Freeway
Bus Stop
Traffic
Signal
Packet Page 2511
8 880 Freeway
Cedar Blvd.

Internal Vehicular Experience
Packet Page 2512
9 880 Freeway
Cedar Blvd.

Internal Pedestrian Experience
Packet Page 2513
10 880 Freeway
Cedar Blvd.

Interstate 880 Experience
Packet Page 2514
11 Plan 2A Front Elevation (SFD)
Architecture
• 118 homes
o 90 SFD / 28 Duet
• 5 Primary Floor Plan Types
• 17 unique elevations
• 1,960 – 2,590 sf +
• 3-4 bed / 3.5 ba + Office
• 2 Car Garage
• Storage
Packet Page 2515
12 Plan 1A Front Elevation (SFD)
Architecture
• 118 homes
o 90 SFD / 28 Duet
• 5 Primary Floor Plan Types
• 17 unique elevations
• 1,960 – 2,590 sf +
• 3-4 bed / 3.5 ba + Office
• 2 Car Garage
• Storage
Packet Page 2516
13 Plan 2-2A Front Elevation (Duplex)
Architecture
• 118 homes
o 90 SFD / 28 Duet
• 5 Primary Floor Plan Types
• 17 unique elevations
• 1,960 – 2,590 sf +
• 3-4 bed / 3.5 ba + Office
• 2 Car Garage
• Storage
Packet Page 2517
14 Plan 2-4A Front Elevation (Duplex)
Architecture
• 118 homes
o 90 SFD / 28 Duet
• 5 Primary Floor Plan Types
• 17 unique elevations
• 1,960 – 2,590 sf +
• 3-4 bed / 3.5 ba + Office
• 2 Car Garage
• Storage
Packet Page 2518
15 3

1. Public Storage –Close the
Pedestrian Gap

2. Traffic Signal

3. Bus Stop

4. Frontage Improvements, South
Side of Cedar Blvd

5. Extend Left Turn Lane @ Cedar / Mowry Intersection
*The items listed here are in
addition to typical impact fees for
BMRs, Parks, Traffic, and Capital
Facilities.

Community Benefits
1 2
4 5
880 Freeway
Smith AveMoores Ave
Cedar Blvd
Cedar BlvdMowry Ave
Packet Page 2519
16 Questions?
Packet Page 2520
Item  F. 1.

DATE 05/25/2023
TO Honorable Mayor and City Council Members
FROM Roya Gonzalez, Administrative Analyst
SUBJECT    Adopt a resolution authorizing the City Manager to execute a Contractual Services Agreement with RHAA Landscape Architecture & Design for the update of the 2017 Citywide Parks Master Plan and approving an amendment of the 2022-2024 Biennial Budget and Capital Improvement Plan for FY 2023.

SUMMARY AND RECOMMENDATION
In 2017, City Council approved the Citywide Parks Master Plan (attached). The plan set forth a number of goals and identified four priority projects. Three of the four projects have been completed and the plan is in need of an update. Staff recommends that City Council authorize the City Manager to execute a Contractual Services Agreement with RHAA Landscape Architecture and Planning in the amount not-to-exceed $148,275 for the update to the Citywide Parks Master Plan and amend the 2022-2024 Biennial Budget and Capital Improvement Plan to appropriate $148,275 for Fiscal year (FY) 2023 from the Park Impact Fee Fund to fund this agreement.

BACKGROUND
The City of Newark operates and maintains 134 acres of City parks. Of this total, 124 acres are owned by the City and 10 acres are leased from the Newark Unified School District. There are 13 parks in the City, including nine neighborhood parks, three community parks, the Shirley Sisk Grove and the MacGregor Community Play Fields.

In 2016, the City contracted with RHAA Landscape Architecture & Planning Inc. to complete a Citywide Park Master Plan. The development of the plan included assessments of the City’s park inventory, community engagement, cost analysis and priority setting. The plan is six years old, with the majority of the community engagement having taken place seven years ago. To keep up with the evolving park trends, demographic changes, and development in Newark, a plan update is needed.

DISCUSSION/ANALYSIS
The adopted plan outlined four priority projects based on community input, three of which have been completed. This includes the NewBark Dog Park at Community Park, Sportsfield Park All-Weather Turf Fields, and the Sportsfield Park Skate Park.

The proposed update will build on the existing Plan and will:

1. Use the park inventory and analysis from the 2017 Plan, updating any changes.

Packet Page 2521

1. Use the park inventory and analysis from the 2017 Plan, updating any changes.

2. Identify the recreational needs of all segments of the Newark community through meeting with key stakeholders and a comprehensive public engagement process, which will include multiple interactive community meetings and an online survey.

3. Assess the “gaps” not presently met by existing park facilities.

4. Identify priority projects and funding opportunities.

The Plan Update will serve as a valuable strategic guide and “roadmap” for both current and future park planning and outdoor recreation development. The update will revisit the visions, goals and objectives set forth in the 2017 Master Plan and incorporate any new information and themes to ensure it is reflective of the needs of the Newark community today. The plan will recommend improvements and address future park and programming needs to accommodate the growth within Newark.

Because the update to the plan will rely heavily on the park analysis and plan completed by RHAA in 2017, it is in the best interest of the City to select and enter into a contractual services agreement with RHAA for the update rather than undergoing a full competitive process. RHAA is a local, qualified and established Landscape Architecture & Planning firm with years of extensive experience in park planning for California cities. Entering into an agreement with RHAA also reduces costs and time that would be incurred with a new consultant, as they would require time and personnel to complete the park inventory that RHAA has already completed and would build upon. A not-to-exceed cost of $148,275 was agreed upon after negotiations with staff.

FISCAL IMPACT
Staff requests authorization to amend the 2022-2024 Biennial Budget and Capital Improvement Plan to appropriate $148,275 for FY 2023 from the Park Impact Fee Fund to fund this agreement.

REVIEW AND APPROVAL
Prepared by - Roya Gonzalez, Administrative Analyst
Reviewed by - Lenka Hovorka, Assistant City Manager
Reviewed by - Krysten Lee, Finance Director
Reviewed by - Kristopher J. Kokotaylo, City Attorney
Approved by - David J. Benoun, City Manager
Attachments
Park Master Plan
Presentation
Resolution Parks Master Plan
Packet Page 2522
City of Newark

CITYWIDE PARKS MASTER PLAN
Packet Page 2523
2 Packet Page 2524
3 Acknowledgements

NEWAK CITY COUNCIL
Mayor Alan L. Nagy
Michael K. Hannon
Luis L. Freitas
Maria Collazo
Mike Bucci

CITY STAFF
John Becker, City Manager
Terrence Grindall, Assistant City Manager
David Zehnder, Director of Recretion and Community Services Prepared by:

CONSULTANT TEAM
Royston, Hanamoto, Alley and Abey, Landscape Architects Barbara Lundburg, Cordy Hill, Lauren Ivey
The Sports Management Group
Lauren Livingston, Julie Spier
Applied Development Economics, Economic Planning & Strategies Doug Svensson
Packet Page 2525
4 Packet Page 2526
5 Table of Contents
CHAPTER 1: Executive summary ........................................................................9

1.1 PURPOSE

1.2 SCOPE
CHAPTER 2: Introduction................................................................................13

2.1 INTRODUCTION

2.2 PLANNING PROCESS

2.3 REVIEW OF EXISTING AND FUTURE PLANNING EFFORTS
CHAPTER 3: Existing Framework...................................................................19

3.1 PARK AMENITIES OVERVIEW

3.2 DEMOGRAPHIC PROFILE

3.3 RECREATIONAL TRENDS
CHAPTER 4: Needs Assessment........................................................................29

4.1 DEMAND

4.2 SUPPLY

4.3 FILLING THE GAP
CHAPTER 5: Plan...................................................................................................35

5.1 VISION FRAMEWORK

5.2 OVERARCHING GOALS

5.3 ASSET INVENTORY AND SPECIFIC SITE RECOMMENDATIONS
CHAPTER 6: Implementation............................................................................81

6.1 PROPOSED PROJECTS

6.2 PRIORITY PROJECTS

6.3 FINANCIAL ANALYSIS AND MANAGEMENT

6.4 CAPITAL PROJECT FUNDING
CHAPTER 7: Appendix........................................................................................117

DOCUMENT REVIEW

PARK SYSTEM AND INVENTORY

DEMOGRAPHIC AND RECREATIONAL TRENDS

COMMUNITY WORKSHOPS, NOTES, AND SUMMARY

OPINION OF PROBABLE COST

PROJECTS BY PRIORITY

GRANT FUNDING
Contents
Figure 1 – Gap Analysis................................................................................................29 Figure 2 – Bayshore Park ............................................................................................38 Figure 3 – Birch Grove Park.........................................................................................40 Figure 4 – Byington Park.............................................................................................42 Figure 5 – Cedar Boulevard Linear Park 1 .................................................................44 Figure 6 – Cedar Boulevard Linear Park 2 .................................................................46 Figure 7 – Cedar Boulevard Linear Park 3 .................................................................47 Figure 8 – Cedar Boulevard Linear Park 4 .................................................................48 Figure 9 – Civic Center Park ........................................................................................50 Figure 10 – Dumbarton Neighborhood Park ............................................................52 Figure 11 – Jerry Raber Ash Street Park ....................................................................54 Figure 12 – Lakeshore Park 1 ......................................................................................56 Figure 13 – Lakeshore Park 2 ......................................................................................58 Figure 14 – Lakeshore Park 3 ......................................................................................59 Figure 15 – Lakeshore Park 4 ......................................................................................60 Figure 16 – Mayhews Landing Park ...........................................................................62 Figure 17 – Mirabeau Park ..........................................................................................64 Figure 18 – Musick Park ..............................................................................................66 Figure 19 – Newark Community Park ........................................................................68 Figure 20 – Shirley Sisk Grove ....................................................................................70 Figure 21 – Sportsfield Park 1.....................................................................................72 Figure 22 – Sportsfield Park 2.....................................................................................74 Figure 23 – Susan Johnson Bridgepointe Park .........................................................76 Figure 24 – Birch Grove Park Dog Park.....................................................................104 Figure 25 – Newark Community Park Dog Park ......................................................105 Figure 26 – Sportsfield Park All-Weather Fields and Updated Path......................106 Figure 27 – Sportsfield Park Skate Park ...................................................................107

CHAPTERS FIGURES
Packet Page 2527
6 Table of Contents
Contents
Table 1 – Newark Public Parks .................................................................................. 19 Table 2 – 2010, 2015, and 2020 Race and Ethnicity Estimates .............................. 22 Table 3 – Estimated Maintenance Costs .................................................................. 81 Table 4 – Operating Cost Model per Field............................................................... 83 Table 5 – Revenue Potential from User Fees of All-Weather Fields...................... 84 Table 6 – Revenue Potential from Lighting Usage Fees......................................... 84 Table 7 – Rental Rate Comparisons for Synthetic Turf Fields................................ 85 Table 8 – Revenue Potential at Shirley Sisk Grove.................................................. 87 Table 9 – LEAF Membership Prices........................................................................... 91 Table 10 – Union City Community Garden Membership Price.............................. 91 Table 11 – Estimated Annual Dog Park Maintenance Costs .................................. 95 Table 12 – Operating Cost Model (assumes 1 acre, or 43,560 sf)......................... 97 Table 13 – Revenue Potential from User Fees of Grass Turf Fields ....................... 97 Table 14 – Rental Rate Comparisons for Grass Turf Fields .................................... 98 Table 15 – Annual Maintenance Cost....................................................................... 99 Table 16 – Fremont Central Park Group Picnic Reservation Fees ........................ 100 Table 17 – Selection of Union City Picnic Reservation Fees by Park and Site .... 100 Table 18 – Proposed Newark Park Reservation Fee Structure ............................. 100 Table 19 – Projected Revenue Estimate .................................................................. 101 Table 20 – Projection of Park Impact Fee Revenue: 2016-2035........................... 110 TABLES
Packet Page 2528

EXECUTIVE SUMMARY
1 2 3 4 5 6 7
Packet Page 2529
8 Packet Page 2530
9 CHAPTER 1: EXECUTIVE SUMMARY Newark Citywide Parks Master Plan

SECTIONS

1.1 Purpose

1.2 Scope

1.1 PURPOSE
Newark’s Citywide Parks Master Plan creates a framework for the future provision of parks in the City. The Master Plan identifies recreation needs in the City and explores opportunities to enhance the existing network, while evaluating the creation of new recreation amenities. The Master Plan assesses the City’s existing framework, generates a needs assessment for recreation planning, and directs a plan and implementation for priority projects.

1.2 SCOPE
The scope of the Newark’s Citywide Parks Master Plan includes an inventory and needs assessment, community outreach, analysis of potential project expansions, and priority setting. The Consultant team worked closely with City staff, and the community, to understand the demand for and viability of recreation projects in the City’s park system.

INVENTORY AND NEEDS ASSESSMENT
The inventory and needs assessment of the Master Plan profiles the City’s existing framework that shapes and informs the demand for recreation services. This element assesses the City’s existing park facilities, understands past and present planning effort, analyzes the community’s demographic and recreational profile, and from this, generates an assessment of need that highlights where community demand is not met by the City’s supply of recreational services.

COMMUNITY OUTREACH
Community outreach was utilized throughout the planning process to ensure the collection of user input. Four community workshops were held for public input and the Consultant worked closely with City Staff throughout the creation of the Master Plan. The Master Plan is additionally built upon the extensive outreach conducted for the City’s 2013 General Plan.

POTENTIAL EXPANSION ANALYSIS AND PROJECT REFINEMENT
Prior to the creation of the Master Plan, the City of Newark had identified new recreation facilities that the community desired through previous planning efforts. These facilities, however, exceeded the community’s short and medium term financial capacity, requiring an assessment of need and system of prioritization for the projects’ creation. In working with City staff, the Consultant helped to assess, refine, and prioritize the City’s vision while exploring additional park projects that would serve the identified recreational need. This process resulted in the creation of schematic park site master plans for the City’s existing and developmentplanned parks - harnessing a vision for the City’s parks that will align with its continued growth.

PRIORITY SETTING
To establish priorities for the City’s park system enhancements, the Citywide Park Master Plan is guided by the Parks, Recreation, and Open Space Element of the City’s General Plan, as well as input collected through working with City staff and the community. The goals from the Parks, Recreation, and Open Space Element of the General Plan that guide this Master Plan include:

Packet Page 2531
10 Newark Citywide Parks Master Plan
Goal PR-1: Protect Newark’s open space for a variety of purposes, including public recreation, the managed production of natural resources, protection of environmentally sensitive areas, aesthetics, and public safety.

Goal PR-2: Expand and improve Newark’s parks and recreational facilities to meet existing and future needs.

Goal PR-3: Manage Newark’s parks in a way that enhances their natural qualities, conveys a positive image of the city and its neighborhoods, and fully meets the community’s recreational needs.

Goal PR-5: Improve Newark’s trail system, with a focus on access to the Newark shoreline, and access between the shoreline and Newark neighborhoods.

These inform the Master Plan’s overarching goals to:
• Protect and support the existing network
• Accommodate demands in service
• Enhance community identity
• Foster connectivity
Combined with a detailed financial analysis of potential park site projects, the overarching goals support the selection of priority projects that, in assessment, will serve the community’s existing and future recreational needs.

PRIORITY PROJECTS
The planning process identifies a total of 92 individual park projects for the City’s consideration. These projects range from amenity enhancements to the creation of new facilities. The following park projects are identified as the top four actionable developments in the Citywide Parks Master Plan.
• Birch Grove Dog Park ($503,783)
• Newark Community Park Dog Park ($315,648)
• Sportsfield Park All-Weather Turf Fields ($4,400,214) and Updated Pedestrian Pathway ($390,478)
• Sportsfield Park Skate Park ($1,140,450)
Packet Page 2532

INTRODUCTION
1 2 3 4 5 6 7
Packet Page 2533
12 Packet Page 2534
13 CHAPTER 2: INTRODUCTION Newark Citywide Parks Master Plan

SECTIONS

2.1 Introduction

2.2 Planning Process

2.3 Review of Existing and Future Planning Efforts

2.1 INTRODUCTION
The Citywide Parks Master Plan is the product of collaboration with the Consultant team, City staff, and the Newark community. The 10 month planning process, launched in June 2016, was initiated in order to explore opportunities to enhance the City’s existing park network, while assessing potential to create new recreation amenities that meet growing community demand in recreation service.

The City of Newark is located along the southwest edge of the San Francisco Bay, completely surrounded by the City of Fremont within Alameda County. Incorporated in 1955, the City is one of the tri-cities with Union City and Fremont. The proximity of the City to Silicon Valley, and impending planning development for urban growth, make Newark an active cultural and economic center in the Bay Area. The City currently has 131 acres of developed parks, with 50% of the City’s open space, nearly 4,500 acres, consisting of undeveloped or nonurbanized land. In addition to the City’s existing open space network, the community has access to Coyote Hills Regional Park and the Ardenwood Historic Farm for valuable outdoor recreation. As Newark is a landlocked City with limited opportunities to develop new parks, the Citywide Parks Master Plan serves as an important tool to make better use of Newark’s existing parks and explore the provision of new facilities within them.

2.2 PLANNING PROCESS
Newark’s Citywide Parks Master Plan incorporates the input of City staff, local community, and Consultant recommendations, while building on the City’s existing General Plan. The following process elements were critical to developing a concise and community-oriented Master Plan tailored to meet City needs.

COMMUNITY WORKSHOPS AND OUTREACH
Four community workshops were held throughout the Summer and Fall of 2016, and the Spring of 2017, to present the Plan’s scope and goals and to collect feedback and community opinion, while presenting updates in the planning process. At the first community workshop on June 7th, 2016, the Consultant team introduced the Master Plan’s purpose and collected initial community input on desired recreation enhancements. The second community workshop, held August 4th, 2016, presented findings from the Consultant on identified recreation needs in the City, potential projects to meet those needs, and participatory activities for community members to voice prioritization of the presented projects. A third community workshop, held November 9th (with a second session held November 12th to ensure attendance), 2016, presented schematic park site master plans for community review. The fourth, and final, community workshop presented the draft Citywide Parks Master Plan for community review and input. Notices regarding community workshops and updates to the planning process were posted regularly to the City website and Facebook page.

STAFF ENGAGEMENT
Newark’s City staff provided clear guidance in the development of the Master Plan, setting concise goals for the direction of the planning process.

Prior to the Citywide Parks Master Plan, City staff had worked closely with community voices to develop the City of Newark General Plan (2013) and the City of Newark Pedestrian and Bicycle Master Plan (2017), allowing them Packet Page 2535
14 Newark Citywide Parks Master Plan
to enter into the Citywide Parks Master Plan with identified new recreational facilities and park expansions that could best serve Newark’s recreational needs. In working with City staff, the Consultant helped to assess, refine, and prioritize the City’s vision.

A kick-off meeting was held between the Consultant and the City on May 31st, 2016, to clarify the project’s scope, refine goals, and establish a schedule for meetings and deliverables. Following an assessment of recreation needs and collection of community input through two workshops, the Consultant team also met with the City for an internal charrette, or design workshop, on August 31st,. In this charrette, the Consultant presented best practice elements for park projects and their potential locations throughout the City’s park and open space network, resulting in the creation of schematic park site master plans. Staff consultation on proposed park projects continued throughout the Master Plan’s development.

2.3 REVIEW OF EXISTING AND FUTURE PLANNING

EFFORTS
Recent and ongoing planning efforts by the City provide direction for the creation of the Citywide Parks Master Plan, and emphasize support for protection and enhancement of Newark’s park network. A review of Newark’s existing and future planning efforts was completed as part of the Master Plan to ensure that Plan recommendations support and build upon existing work. For additional information on the City’s existing and future planning efforts, reviewed in the Master Plan, see Appendix A.

CITY OF NEWARK GENERAL PLAN, 2013
The City of Newark General Plan is Newark’s comprehensive planning document created to guide the City’s impending growth and development while preserving and enhancing its existing character. To formalize the future of Newark’s existing park system, the City’s General Plan calls for the creation of the Citywide Parks Master Plan to prioritize funds for future park and recreation projects and to create a systematic foundation for the future of Newark’s open spaces.

Throughout the General Plan, planning elements support the protection and enhancement of the City’s park network through various goals, policies, and actions.

CITY OF NEWARK PEDESTRIAN AND BICYCLE MASTER PLAN, 2017 The City of Newark Pedestrian and Bicycle Master Plan is Newark’s first bike and pedestrian transportation plan, outlining long-range pedestrian and bicycle improvement projects for the City. The Plan’s proposed projects provide access to the Bay Area water front, local parks and trails, and regional open spaces for recreation. In relation to Newark’s Citywide Parks Master Plan, the Pedestrian and Bicycle Master Plan delineates the importance of pedestrian-scale connectivity to the City’s park and open space resources as an important component of network circulation.

CITY OF NEWARK GREATER NEWPARK MASTERPLAN, 2015
Newark’s Newpark Mall is a regional-serving shopping center set aside for major enhancements in the near future, guided by the work defined in the City of Newark Greater Newpark Master Plan. Along with the Dumbarton Transit Oriented Development Specific Plan and the Southwest Newark Residential Packet Page 2536
15 Newark Citywide Parks Master Plan
and Recreational Project, the Greater NewPark Project is one of three sites in the City envisioned for new residential, workplace, and open space development. The Greater Newpark Masterplan prioritizes the reorientation of the Shirley Sisk Grove, a public open space parcel within the project boundary, to support the creation of a vibrant commercial center.

DUMBARTON TRANSIT ORIENTED DEVELOPMENT SPECIFIC PLAN, 2010 The Dumbarton Transit Oriented Development (TOD) project consists of approximately 200 acres of industrial land on the west side of Newark.

The railroad right-of-way on the northern edge of the project has been selected as the alignment for a potential new transit line to link southern Alameda County with the Peninsula, creating an opportunity to capitalize on public investment through adjacent development with high-density, residential, retail, and office uses and enhanced pedestrian circulation. The Specific Plan prioritizes the City’s park network through the designation of park areas to be created in accordance with the development, providing collaboration opportunity for the Citywide Parks Master Plan.

SOUTHWEST NEWARK RESIDENTIAL AND RECREATIONAL PROJECT, 2009 In the Newark California General Plan, the City identifies several Focus Areas where major land use change is anticipated. The Southwest Newark Residential and Recreational Project, formerly identified as Area 3 and 4 of the General Plan, is an identified Focus Area for which a Specific Plan was created: the Newark Specific Plan: Area 3 & 4 of the General Plan. The Specific Plan defines parameters for the transition of this undeveloped area into a low-density residential development of up to 1,260 housing units, with a major recreational facility and the dedication of conservation open space on some of the low-lying land south of the railroad tracks.

In relation to Newark’s Citywide Parks Master Plan, the Southwest Newark Residential and Recreational Project provides opportunity to expand the City’s public open space.

JOINT USE AGREEMENT
The City has shared joint use of Macgregor Playfields with the Newark Unified School District since 1987. Under the joint use agreement the City constructed the playfields, parking lot, and structures, and performs ongoing maintenance, while the School District pays for the site’s irrigation. The City’s joint use of fields provides opportunity to efficiently meet Newark’s open space and recreation needs.

Packet Page 2537
this page is intentionally blank
Packet Page 2538

EXISTING FRAMEWORK
1 2 3 4 5 6 7
Packet Page 2539
18 Packet Page 2540
19 CHAPTER 3: EXISTING FRAMEWORK Newark Citywide Parks Master Plan

SECTIONS

3.1 Park Amenities Overview

3.2 Demographic Profile

3.3 Recreational Trends
This portion of the Master Plan outlines the existing facility framework and City conditions that inform the Citywide Parks Master Plan, including an overview of the City’s park and recreation assets, the community’s demographic profile, and current and emerging trends in recreational planning that impact the Master Plan’s recommendations.

3.1 PARK AMENITIES OVERVIEW

EXISTING PARK NETWORK
The City of Newark applies two types of standards in park planning. The first standard is the City’s adopted planning requirement of 3 acres of parkland per 1,000 residents in the application of the Quimby Act, which establishes a standard for land set aside by current and future developers.

In California, dedication requirements under the Quimby Act may range between 3 acres per 1,000 residents to 5 acres per 1,000 residents, dependent on a city’s existing supply of parkland.

The second standard of park planning is the creation and enforcement of service area standards, categorized as neighborhood parks, community parks, and special use parks in the City of Newark. The City defines neighborhood parks as resident-serving recreation spaces ranging from 5 to 10 acres and accessible to users within a half-mile radius. These parks typically host lawn, play areas, and small recreation facilities such as basketball courts. Community parks may be 15 to 20 acres in size and are designed to serve residents within a 1 to 2 mile radius. These parks typically include off-street parking, larger recreation facilities that draw users from a greater service area, and are accessible by public transit.

Special use parks have no requirement in size or service but are associated with a unique function or facility they provide the City.

The Newark Recreation and Community Services Department operates 131 acres of City parks and several recreation facilities. 121 acres of this parkland is City-owned, with an additional 10 acres leased at MacGregor Play Fields through the Newark Unified School District. The City of Newark maintains 13 parks in total: 8 neighborhood parks, 3 community parks, and the 2 special use parks Shirley Sisk Grove and MacGregor Play Fields. Based on the 2010 census, the City maintains 3.11 acres of parkland per 1,000 residents, inclusive of MacGregor Play Fields due to long term joint use.

In recreation facilities, the City owns and operates the Silliman Activity and Family Aquatic Center, the Clark W. Redeker Newark Senior Center, and the Newark Community Center (not programmed, but available for community events and rentals). Table 1 lists the City’s parks, per service area classification, several of the facilities offered, and their location.

Table 1 – Newark Public Parks
Park Acres Facilities Location
Neighborhood Parks
Byington Park 3 Play structures, picnic
facilities, water feature
Central Avenue at Byington
Drive
Civic Center Park 5
Play structures, basketball
court, pathways, picnic
facilities
Civic Terrace Avenue at
Newark Boulevard
Jerry Raber Ash Street
Park 6
Play structures, softball
fields, basketball court,
picnic facilities
Enterprise Drive at Filbert
Street
Lakeshore Park 26
26-acre total includes 10
acres of lawn, paths, and
par course area and a 16-
acre water area with fishing
and boating
Lake Boulevard at
Parkshore Drive
Packet Page 2541
20 Newark Citywide Parks Master Plan
Mayhews Landing Park 8 Play structures, basketball
court, picnic facilities
Cherry Street at Montcalm
Avenue
Mirabeau Park 6 Play structures, paths, picnic
facilities
Haley Street at Mirabeau
Drive
Musick Park 1 Play structures, picnic
facilities
Musick Avenue at Cedar
Boulevard
Susan Johnson
Bridgepointe Park 4 Play structures, picnic facilities
Spruce Street at
Bridgepointe Drive
Community Parks
Birch Grove Park 15
Play structures, water
feature, lit softball field,
basketball court, tennis
courts, picnic facilities,
restrooms
Birch Street at Robertson
Avenue
Newark Community Park 16
Play structures, warmup wall, basketball and
handball court, lawn,
paths, tennis courts, picnic
facilities, Community
Center
Cedar Boulevard at
Chapman Drive
Sportsfield Park 20
Lighted and non-lighted
softball field, soccer fields,
Family Aquatic Center,
Community Activity Center,
including gymnasium,
showers and locker room,
aerobic/ dance studio,
fitness center, teen room,
children’s room, community
meeting room, childcare
Mowry Boulevard at Cherry
Street
Special Use Parks
Shirley Sisk Grove 2 Passive open space for
summer concerts
Cedar Boulevard at North
Magazine
MacGregor Play Fields 11 Soccer and baseball practice
and game fields
Cedar Boulevard at Lake
Boulevard

ISSUES AND OPPORTUNITIES
A full inventory of the City’s parks was completed through the Master Plan process. Over several tours during April and May 2016 each City-owned, or programmed, park was visited with the assistance of City staff and members of the Consultant team. Parks were inventoried to assess how each asset currently serves the community and where they hold potential to expand and improve upon recreational opportunities. This assessment aids in determining the level of recreational need currently being met while identifying those recreational wants that are lacking or not being served in the City of Newark. The following information was collected for each park:
• Location: Intersection
• Size: Park acreage
• Use: Serving neighborhood, community, or special use
• Current condition: Description of current conditions
• Facilities and amenities: List of facilities and amenities provided • Recreation provided: City-supported recreation provided • Accessibility: General assessment of ease of access for all users • Constraints: Features that compromise the site’s full potential • Opportunities: Preliminary ideas regarding opportunities to expand or enhance the site’s recreation
In inventorying the City’s existing park network several issues and opportunities were identified that apply universally across the Newark park system. These issues include accessibility, maintenance, quality of structures and facilities, and a general need for site activation.

Accessibility
Throughout the park system compliance to standards of accessibility can be enhanced, especially in the City’s playground design. To improve accessibility, while decreasing maintenance requirements, the Master Plan Packet Page 2542
21 Newark Citywide Parks Master Plan
recommendations consider replacing engineered wood fibar (“tanbark”) with resilient rubber matting surfaces. The short-term cost of rubber matting may be desirable compared to the long-term maintenance cost of wood fibar. In lieu of replacing existing fibar, the City should ensure that accessible ramps lead into each play area.

In playground accessibility, the Master Plan also considers providing universal play equipment and transfer stations, which allow users to access elevated play structures without use of a wheelchair or mobility tool. Play structures should encourage interactive play for children of all abilities and installing universal play equipment, such as spinners and saucer swings, can provide recreation options to a diversity of users. The Master Plan did not conduct a formal accessibility study.

Maintenance
In the inventory of Newark’s parks, overall park facility maintenance is challenging. As is common in public open space, graffiti, vandalism and litter are unwanted companions to many of the City’s open space assets.

To enhance community pride and investment in the daily upkeep of shared green space, the Master Plan prioritizes park maintenance.

Quality of Structures and Facilities
Newark’s park system incorporates a variety of essential recreation elements such as playgrounds, picnic tables, walking paths, and lighting.

Though these elements support the existing parks, many are aged and require an update or replacement.

Newark’s playgrounds and play structures can attract a wider range of users through updated design and program. Thematic design, nature play, and the addition of interactive elements create a varied and creative experience for young users.

Picnic and seating options also provide opportunity for improvement and diversity. The Master Plan considers replacing or enhancing these existing structures to continue accommodating community members for current and future enjoyment. Focusing on variety in aesthetic character, while improving functionality through additional shade structures, is recommended.

The majority of Newark’s parks maintain asphalt walking paths that are frequently in use. As popular modes of pedestrian circulation, the Master Plan considers replacing asphalt walkways, which need regular resurfacing, with concrete paths which require less long-term maintenance. The provision of all-weather pathways along park perimeters to further support walking and jogging in the community, is also in consideration.

Improved, or added, lighting through park paths will also improve user experience.

Activation
Though Newark has a variety of open space assets, this inventory and assessment finds that the majority of the City’s parks are underused. The master planning process prioritizes activating use through programming considerations and supporting alternate recreation uses through the creation of unique special use facilities within parks, such dog parks, where opportunity exists.

To see additional, detailed information on the park system inventory, please see Appendix B.

PARKS IN PLANNED DEVELOPMENTS
Beyond the City’s existing park network, new recreation space is proposed in pending planning efforts and additionally considered in the Citywide Packet Page 2543
Parks Master Plan. Within the Dumbarton Transit Oriented Development 22 Newark Citywide Parks Master Plan
Plan, three parks areas are proposed, totaling nearly 9 acres of parkland; a 5 acre community park, a 3 acre neighborhood park, and a linear park and/or trail connecting to the existing Bay Trail. Additionally the Southwest Newark Residential and Recreation Project envisions creating 5 acres of park, in 2 separate park projects, and developing 80, or more, acres of land for a major recreation facility (golf or comparable amenity).

The Master Plan incorporates recommendations for 2 proposed park sites in the 2010 Dumbarton Transit Oriented Development Specific Plan, discussed later in the document.

3.2 DEMOGRAPHIC PROFILE
To understand the City, a demographic profile was created using 2010 Census, 2014 estimated, and 2020 projected demographic data. This data is based on the United States Census and projections provided by Nielsen Site Reports, an industry leader in global information and demographic data. Supplemental data sources include the City of Newark Community Development Department and the Association of Bay Area Governments (ABAG).

The City’s demographic profile supplies information on who comprises the Newark community, informing the recommendations of the Master Plan.

POPULATION PROJECTIONS AND DENSITY
The City of Newark is a diverse and dense, urban enclave with dramatic population growth expected within the next two decades. Newark grew rapidly during the 1960s and 70s, and steadily increased in population at a rate ranging between 12% and 18% through the year 2000. Between 2000 and 2010, however, the City’s growth stalled with only a 0.2% rise in population. From 2010 to 2015, the City returned to moderate growth by expanding from a reported 42,573 to 45,396 persons, a 6.6% increase in 5 years. See Table 2 for the City’s race and ethnicity estimates.

Table 2 – 2010, 2015, and 2020 Race and Ethnicity Estimates Estimates 2010 % 2015 % 2020 %
Total Population 42,573 45,396 48,026
Hispanic or Latino 14,994 35.2% 16,709 36.8 % 18,426 38.4% White Alone 11,726 27.5% 10,753 23.6% 9,514 19.8%
Asian 11,404 26.8% 13,112 28.9% 14,970 31.2%
Black or African American 1,908 4.5% 2,123 4.7% 2,283 4.8% Nat. Hawaiian and Other
Pac. Isl. 601 1.4% 625 1.4% 645 1.3%
Amer. Indian and Alaska
Native 95 0.2% 102 0.2% 103 0.2%
Two or More Races 1,744 4.1% 1,856 4.1% 1958 4.1%
Other 101 .02% 116 0.3% 127 0.3%
Totals 100% 100% 100%
Though the City is expected to grow another 5.7% to 48,026, between 2015 and 2020, high demand for housing and action taken by the City to support its development is projected to significantly increase the City’s population over the next two decades, exceeding both Nielsen and ABAG projections. The City’s 2013 General Plan supports a substantial increase in residential development. While ABAG projects a Newark population of 57,000 residents by the year 2040, the City’s General Plan projects a 46% increase in housing units, due to multiple development and housing projects approved by the City, increasing the population to an estimated 60,000 residents by 2035.

In density, Newark had a 2010 population density of 3,068 persons per square mile compared to Alameda County’s density of 2,043 persons per square mile, and 13 times greater than the State of California’s population density of 232 per square mile. Comprising nearly 14 square miles, Newark’s built-out character requires thoughtful planning to better use Packet Page 2544
23 Newark Citywide Parks Master Plan
the City’s existing parks and explore the provision of new facilities within them that meet growing recreational demands while serving the growing population.

AGE GROUPS
The City of Newark, according to the 2010 Census, has three significant age cohorts that define its community profile. The City is comprised of 20% Baby Boomers, aged 52 to 70 years; 20% Youth, aged 0 to 14 years; and 35% Family Forming Adults, aged 21 to 44 years. These age groups are prime users of City recreation facilities and services.

The Youth cohort drives demand for extracurricular enrichment activities such as before and after school programming, camps, sports, and ageoriented programs for young and teen age groups. The need for parks and recreation services and amenities will persist as this age group, along with family-forming segments of the population, continues to rely on community recreation for leisure services. Family Forming Adults, aged 21 to 44 years, comprise the largest segment of the population, indicating a continued need for family, youth and preschool services, recreation amenities, and parks within the City of Newark.

The Baby Boomer generation, a cohort aging in place and creating a demand for increased services and programming, comprises 20% of the City’s age groups. 2020 population projections indicate that older adults and retirement age cohorts, including Baby Boomers, will continue to increase in population as they remain in their Newark residences. The need for senior services, health and wellness, fitness, and support systems for an aging population will remain in demand as elements in the City’s existing recreation network.

HOUSEHOLD COMPOSITION AND RESIDENCY
There were 12,972 households in the City of Newark at the time of the 2010 Census. Of these, nearly 80% were family households which include a householder and one or more people living in the same household related to the householder by birth, marriage, or adoption. 44% of households had individuals under 18 years of age. Additionally, following the aging trend of the City, the median age of householders is growing as homeowners remain in place; in 2010 the median age was 49.6, in 2015 it was 50.7, and is projected to be 52 years in 2020.

According to 2015 estimates, the average residence of homeowners and condominium owners in Newark is 16 years. Combined with the existing moderate home ownership rate in the City (30% of household are renter occupied), the household composition of Newark reveals that community members are rooted and will continue to desire access to the City’s resources, including parks and open space. It may also be an indicator that community members are satisfied with City and regional services provided.

INCOME
Overall, Newark is a relevantly affluent community in the Bay Area. The 2010 median household income for the City of Newark was $69,278, higher than the State of California at $60,400, and on par with the County at $69,384. However, the 2014 Census projections of median household income indicate a rise to $86,521 for the City, significantly higher than the County at $73,775. There is a portion of the community, however, that will continue to benefit from subsidized programming and fees in order to have access to parks and recreation and community department facilities and services, as 5.6 % of families in the City live below the poverty level. This compares favorably to the County and State at 9.3% Packet Page 2545
and 11.8%, respectively.
24 Newark Citywide Parks Master Plan
For more information on the City’s demographic analysis and community profile, please see Appendix C.

3.3 RECREATIONAL TRENDS
Understanding existing and emerging trends in recreational planning is an important tool in projecting interest in and use of recreation services.

For the City of Newark, an analysis of demographic, recreation, social, economic, and regional trends was conducted to best inform the Master Plan. Understanding these trends ensures that the City’s planning efforts look ahead while staying relevant with other service providers.

DEMOGRAPHIC TRENDS
Baby Boomers
Baby Boomers are a growing population segment that desire activities and programs that will assist them in maintaining a long and healthy lifestyle.

Born between 1946 and 1964, those in this group generally do not view themselves as seniors and many do not plan to retire like generations before them. 7 in 10 Americans plan to work following retirement from their mainstay career, and an additional 14% plan to continue their work as volunteers.1 In the City of Newark, 19% of the population is aged 52 to 70. Baby Boomers embrace physical fitness and are invested in personal health.2 Park and recreation departments can facilitate Boomers’ 1 John J. Heldrich Center for Workforce Development, Rutgers, The State University of New Jersey Center for Survey Research and Analysis, and the University of Connecticut. (2005).

Work Trends: Americans Attitudes About Work, Employers, and Government. Retrieved July 6, 2007 from www.heldrich.rutgers.edu/Resources/Publication/192/WT16%20Press%20 Release.pdf
2 Springs, Stephen. “Designing Recreation Centers for Seniors.” Athletic Business Magazine.

February 2015.
needs in physical health, interests and hobbies, resource accessibility, and volunteerism.

Many of today’s Boomers are part of the Sandwich Generation, adults who are providing some kind of care for a parent while raising or supporting their own children. It is estimated that 20 million Americans are currently in this cohort, with that number expected to double within the next 10 years.3
With an aging population and a generation of young
adults struggling to achieve financial independence, the burdens and responsibilities of middle-aged Americans are increasing. Nearly half, 47%, of adults in their 40’s and 50’s have a parent aged 65 or older, and are either raising a young child or financially supporting a grown child, age 18 or older.4 The impact of the Sandwich Generation on recreation is seen in the increased need for multi-generational facilities that serve children, adults, and older adults at a single location and often, simultaneously.

Racial and Ethnic Diversity
According to ABAG, two demographic trends are shaping the growth of Bay Area communities: substantial racial and ethnic diversification, with a specific increase in Asian and Latino, or Hispanic, populations.5 Reflected in the City’s own demographic profile, recreational planning will need to meet the needs and expectations of a diverse and growing community. 3 Parker, Kim and Eileen Patten. “The Sandwich Generation: Rising Financial Burdens for Middle-Aged Americans.” (1). Pew Research Center: Social and Demographic Trends. Pew Research Center, 30 Jan 2013. Web. 21 Jan 2014. <www.pewsocialtrends.org/files/2013/01/Sandwich_ Generation_Report_FINAL_1-29.pdf>
4 Ibid.
5 Association of Bay Area Governments & Metropolitan Transportation Commission. “Plan Bay Area: The Bay Area in 2040 (30)”. Electronic. http://files.mtc.ca.gov/pdf/Plan_Bay_ Packet Page
Area_FINAL/2-The_Bay_Area_In_2040.pdf
2546
25 Newark Citywide Parks Master Plan
Millennials
Those born between 1982 and 2000 are referred to as the Millennial Generation. Now between the ages of 16 and 34 years, Millennials number nearly 11 million in the State of California.6 This generation is the most educated generation of Americans, the most ethnically diverse generation in United States history, and possesses the most disposable income.7 A highly mobile population, recreational planning should take into account the future needs of this demographic.

RECREATION TRENDS
Childhood Obesity and Health
Childhood obesity has gained significant awareness in recent years as a public health concern. In 2010, more than one third of children and adolescents were overweight or obese,8
with obesity currently affecting
17% of all children and adolescents in the United States.9 In the City of Newark, nearly 40% of students were categorized as overweight or obese, according to a University of California Los Angeles study on the results of the 2010 California Physical Fitness Test (PFT).10 Parks and recreational planning have the capacity to promote active lifestyles through the provision of active programs and ensuring a safe, accessible open space network.
6 Nielsen Corporation SiteReports. Figure is based on 2014 estimates for the Town of Windsor, using age groups 15-20, 21-24, and 25-34. See Demographic Analysis for data. 7 California State Parks, Recreation Opportunities publication, March 2010. 8 Ogden CL, Carroll MD, Kit BK, Flegal KM. Prevalence of obesity and trends in body mass index among US children and adolescents, 1999-2010. Journal of the American Medical Association 2012;307(5):483-490.
9 Centers for Disease Control and Prevention, “Childhood Overweight and Obesity” <www. cdc.gov/obesity/childhood/> Atlanta, GA. 5 Aug 2013. Web. 22 Jan 2014. 10 California Dept. of Education, Physical Fitness Testing Research Files (Dec. 2015).

Unstructured Recreation
Self-directed play and the development of recreation space that allows for unstructured activities is a significant recreational trend that parks and open space environments enable. Linking parks together with green corridors and trails is a feature of community design that encourages mobility, accessibility, socialization, fitness, and an appreciation of the natural environment. The ability to encourage spontaneous play environments is of increasing importance in park design.

SOCIAL TRENDS
Community Design for Social Recreation and Inclusion
Addressing issues of social alienation and physical inactivity through community design, to create usable and vibrant social space, is an emerging trend in recreation planning. 11 As inactivity and social isolation increase, so does the incidence of obesity, heart disease, diabetes, depression, and mental illness.12 Thriving public spaces promote the familiarity and social bonds that make communities and neighborhoods safer and healthier. In promoting social recreation, inclusive design is an important consideration to facilitate interaction by users with various ages, physical abilities, and cultural interests.

Sensitivity to Gender Neutrality
Municipal parks and recreation departments are charged with providing healthy and safe recreation programs and services to all community members. As issues of gender and transgender rights gain heightened 11 Project for Public Spaces. (2006). Health and Community Design, Project for Public Places.

Retrieved July 18, 2007 from http://www. pps.org/info/placemakingtools/issuepapers/ health_community
Packet Page 2547
12 California State Parks, Recreation Opportunities publication, March 2010. 26 Newark Citywide Parks Master Plan
national awareness, families, communities, and institutions nation-wide are adopting the practice of gender neutrality, defined as creating an environment in which distinguishing roles based on someone’s sex or gender is discouraged. In response, parks and recreation departments are reevaluating policies, facilities, and programs to encourage gender neutrality and not obstruct participation.13
Technology and Social Media
Mobile device technology now plays an important role in recreational lives and habits. Internet and mobile applications are frequently used as tools in activities and programming, with the internet becoming a key method of communicating information. Residents are turning to the web for information, which must be accurate and easy to access to understand their community’s park network.

ECONOMIC TRENDS
Fiscal Accountability
Municipal parks and recreation agencies are required to be fiscally responsible while meeting the challenge of increased demand for services from a growing population. Park and recreation departments must be financially sustainable, competitive in the marketplace, and incorporate sound business practices in operational planning. The City of Newark has experienced these impacts as it grows and develops. The City’s Recreation and Community Services Department has a significant challenge in securing sustainable funding to provide the services and facilities needed for the population now and in the future, requiring the creation of a 13 Oakleaf, Linda. “Social Equity in Parks for the Transgender Community.” Parks & Recreation Magazine. October 2015. http://www.parksandrecreation.org/2015/October/ Social-Equity-in-Parks-for-the-Transgender-Community/
flexible and feasible implementation and operation plan for the City’s park updates and enhancements.

REGIONAL TRENDS FROM RECREATION PROVIDERS
Understanding trends impacting local recreation service providers informs the City’s Recreation and Community Services Department in the provision of services. Recreation Management, a national organization focused on recreation, sports and fitness facilities, conducts an annual survey to assess trends in the field. This survey gathers input from public and private recreation service providers in the United States, with responses organized by region.

The 2016 survey found that service providers in the West Region, which incorporates California, are more likely to:
• Serve all-ages, with a focus on adult and senior programming • Have energy efficient facilities
• Expect development in recreation and additional facilities • Include special use facilities such as dog parks and community gardens • Provide programming for individual enrichment such as yoga and performing arts
These responses provide benchmarks and assist in shaping the trends and direction of similar jurisdictions in the regional area.

For a detailed description of the recreation trends analysis completed for the Master Plan, see Appendix C.

Packet Page 2548

NEEDS ASSESSMENT
1 2 3 4 5 6 7
Packet Page 2549
28 Packet Page 2550
29 Newark Citywide Parks Master Plan

SECTIONS

4.1 Demand

4.2 Supply

4.3 Filling the Gap
This section looks at gaps in the City’s park network, established through the collection of community input and collaboration with City staff while incorporating the assessment of the City’s existing framework. Identifying the opportunities for enhanced service inform the Master Plan in creating a sustainable and fulfilling park network.

The needs assessment for the Master Plan was conducted in the form of a gap analysis. Gap analysis is generated from an assessment of the City’s existing community profile, current trends in recreation management, a review of the City’s supply of recreation amenities, and the community’s input and expectations. Assessing the level of demand, compared to the City’s supply of recreation services, identifies gaps in service and opportunities to satisfy community needs.

4.1 DEMAND
An understanding of the City’s demand for recreation service is informed by an evaluation of the collected community input, the City’s demographic profile, and trends in recreation that may impact City park services.

COMMUNITY INPUT
Four community workshops were held throughout the Summer and Fall of 2016, and the Spring of 2017, to present the Plan’s scope and goals and to collect feedback and community opinion while presenting updates in the planning process. The community workshops revealed that the Newark community:
• Values outdoor recreation
• Prioritizes the enhancement and creation of sport fields • Has a growing interest in non-traditional sports, such as skating • Seeks adaptive use of space and resources
• Desires community connection
At the first community workshop, attendees were introduced to the planning process for the Citywide Parks Master Plan and asked to provide initial input on their desires for the City’s park and recreation network. At this meeting, attendees expressed an appreciation for Newark’s supply of park space, noting that overall park size and location served users well.

Many suggested, however, a general desire for improved maintenance and an update to existing site features throughout the City’s park network.

Improvement in turf maintenance for sport fields, removal of trash, and updated structures (playgrounds, picnic facilities, etc.) for ease of access and user inclusion were key concerns expressed. Understanding that a major component of the Master Plan is to assess the feasibility and prioritize the creation of new park facilities, attendees were asked CHAPTER 4: NEEDS ASSESSMENT
Figure 1 – Gap Analysis
supply demand gap
Packet Page 2551
30 Newark Citywide Parks Master Plan
to express what additions they desired for the community’s recreation network. Workshop participants strong advocated for the creation of a skate park, dog parks, and an all-weather turf sport facility.

The second community workshop served as a tool to prioritize park projects in Newark. Presented with an assessment of the City’s existing facilities and early community input, attendees were asked to prioritize several park projects. The presented park projects were selected through collaboration with City staff and the Consultant team as elements to meet recreational demand in the City. Prior to the Citywide Parks Master Plan, City staff had worked closely with community voices in earlier planning efforts, allowing them to enter into this planning process with identified new recreational facilities and park expansions that could serve Newark’s recreational needs. The results of this workshop revealed the following as top-priority projects in the Newark Citywide Parks Master Plan:
• Dog Park
• All-Inclusive Playground
• Synthetic Turf Field(s) with Lights
• Bike Skills Track (Pump Track)
• Skate Park
The third workshop session presented schematic park site master plans for the City’s park network for public review. To ensure wide attendance the final workshop was held twice, with the same format and content used at both sessions. At this workshop, attendees continued to prioritize previously identified park projects, specifically noting that the size and location of proposed dog parks and the proposed skate park, in the schematic master plans, may not be large enough for efficient amenity use.

The schematic master plans were updated to incorporate this community input, resulting in an enlarged dog park and the placement of a dedicated bike skills park at Birch Grove Park.

The fourth community workshop presented the draft Citywide Parks Master Plan to the Newark community for review and input. At this session, attendees encouraged that the Master Plan consider access for all user and recreation groups and inclusion of sustainability in project development.

Additionally a discussion of specific project design concepts was held, with the understanding that proposed projects will receive additional design and community input as they are developed.

See Appendix D for notes, photos, and a detailed summary of the community workshops.

COMMUNITY PROFILE
Newark’s community profile shows a City with high demand for recreation and a need for continued park and recreation services as the City expands. The community is family-oriented with aging adults, rooted in their households; prime users of the City’s park network. The City is also racially diverse, dense in population, and largely built-out with substantial expected population growth. This character requires thoughtful planning to better use the City’s existing parks and explore the provision of new facilities within them that will meet growing recreational demands while serving the growing population.

TRENDS IN RECREATION
Communities are moving towards recreational planning that takes into account accessibility, inclusion, and environmental and fiscal sustainability.

As the City updates and expands its recreation network it must support user demands. Aging community members and increasing racial diversity impact desired recreation services, while general trends in programming direct user desires. Providing space for flexible and health-oriented Packet Page 2552
31 Newark Citywide Parks Master Plan
activity is a priority for the community. Ensuring that new planning will incorporate inclusion, community cohesion, and technology will be important considerations for the implementation of the Master Plan.

4.2 SUPPLY

EXISTING FACILITIES
The City’s existing park network is extensive in size, with parks throughout the City. Neighborhood, community, and special use parks provide community members with programmed recreation and flexible activity, while surrounding open space assets serve as additional places of recreation value. The aged system, however, reveals general issues in accessibility, maintenance, quality of structures and facilities, and an overall need for site activation. The City is unlikely to acquire substantial new parkland, making it important to efficiently utilize existing facilities and to explore opportunities to add new amenities that satisfy current and future community interests.

4.3 FILLING THE GAP

MEETING COMMUNITY DEMANDS
Prior to developing the Citywide Parks Master Plan, the City of Newark had identified new recreation facilities that the community desired.

Action items in the City’s 2013 General Plan called for the exploration of developing a skate and bike park, multi-purpose all-weather turf fields at Sportsfield Park, and a dog park for community use. These facilities, however, exceeded the community’s short and medium term financial capacity, requiring an assessment of need and system of prioritization for the projects’ creation. The needs assessment of the Master Plan upholds and reinforces the creation of these new recreation facilities for the City, and recommends additional park projects for the City’s future.

Demographically, the community is comprised of prime recreation users and will continue with this trend as the City grows. Community input asserts that residents value recreation, prioritize open space for activities, have a growing interest in non-traditional sports, seek adaptive use of the City’s park facilities and resources, and strive for community cohesion.

The City’s existing supply of park amenities is extensive, yet aged, and can be enhanced to meet current and future recreation demands. Although basic updates to existing features and improved maintenance is a general consensus, the planning process has shown that the City of Newark prioritizes the creation of unique, special-use facilities that will provide enhanced recreation opportunities in a built-out urban area. These facilities include dog parks, an all-weather turf field, and a skate park. The following section will elaborate on the selected projects, their cost, and locations within the City’s park network, and additional park projects that were identified for the future of Newark’s park system.

Packet Page 2553
this page is intentionally blank
Packet Page 2554
PLAN 1
234567
Packet Page 2555
34 Packet Page 2556
35 Newark Citywide Parks Master Plan

SECTIONS

5.1 Vision Framework

5.2 Overarching Goals

5.3 Asset Inventory and Specific Site Recommendations

5.1 VISION FRAMEWORK
The Citywide Park Master Plan is directly guided by the Parks, Recreation, and Open Space Element of the City’s 2013 General Plan. The goals of the Parks, Recreation, and Open Space Element that guide this Master Plan include:

Goal PR-1: Protect Newark’s open space for a variety of purposes, including public recreation, the managed production of natural resources, protection of environmentally sensitive areas, aesthetics, and public safety.

Goal PR-2: Expand and improve Newark’s parks and recreational facilities to meet existing and future needs.

Goal PR-3: Manage Newark’s parks in a way that enhances their natural qualities, conveys a positive image of the city and its neighborhoods, and fully meets the community’s recreational needs.

Goal PR-5: Improve Newark’s trail system, with a focus on access to the Newark shoreline, and access between the shoreline and Newark neighborhoods.

KEY POLICIES RELATED TO THE MASTER PLAN
City of Newark General Plan, 2013
• Creation of the Citywide Parks Master Plan
• Provide adequate and varied recreation opportunities
• Create new high-quality recreational open spaces and enhance existing recreational facilities and open space
• Promote public health and safety
• Develop a more sustainable and healthy community and promote walking and biking through focused development
City of Newark Pedestrian and Bicycle Master Plan, 2017 • Complete the Cedar Boulevard Extension Linear Park to support bike network connectivity
• Support pedestrian-scaled connectivity to the City’s park and open space resources
City of Newark Greater NewPark Masterplan, 2015
• Attract revenue-generating commercial and entertainment uses that complement existing and desired retail and entertainment anchors • Repurpose Shirley Sisk Grove to support the development of Newpark Mall as a vibrant regional commercial center
Dumbarton Transit Oriented Development Specific Plan, 2010 • Develop three park areas - a neighborhood park, a linear park and/or trail that connects to the Bay Trail, and a park adjacent to the Transit Station
CHAPTER 5: PLAN
Packet Page 2557
36 Newark Citywide Parks Master Plan

5.2 OVERARCHING GOALS
The following overarching goals shape the recommendations proposed in the Citywide Parks Master Plan. They are informed by the Parks, Recreation, and Open Space Element of the City’s General Plan..

PROTECT AND SUPPORT THE EXISTING NETWORK
A leading goal of the Citywide Parks Master Plan is the protection and enhancement of the City’s existing park
network. Protecting and supporting these spaces enables their use for community recreation, environmental
preservation, visual appreciation and public safety.

Supporting the existing framework is critical in
establishing a base for the network’s development and
expansion.

ACCOMMODATE DEMANDS IN SERVICE
The recommendations proposed in the Master Plan are
dictated by the community’s existing and future needs in recreational service. Throughout the planning process,
the community has expressed a demand for unique,
special-use facilities that will provide enhanced recreation opportunities within the built-out city. The Master Plan provides park project recommendations that align with
community desires and available resources. The Master
Plan additionally acknowledges opportunities in pending development for the creation of recreation facilities; as the City grows so will the community’s demands in recreation service.

ENHANCE COMMUNITY IDENTITY
Parks and open space are valuable amenities that help
define the City’s character, identity, and appeal. Project recommendations aim to meet the community’s needs
while supporting the City’s character in the greater Bay Area.

The recommendations put forth in the Master Plan call for facility updates and modernization, creation of park sites that facilitate use by a variety of community members,
improved maintenance for system health, and responsive
design that meets current and future recreation trends.

Additionally, unique, special-use facilities will not only fulfill community need, but also increase the attractiveness of the City.

FOSTER CONNECTIVITY
Newark’s park system serves as a vital element of the
City’s pedestrian-scale circulation network; destinations for active and accessible recreation. In exploring
enhancements to the existing system, the Master Plan
incorporates opportunities to improve connectivity in
the City, particularly through the creation of the Cedar Boulevard Extension Linear Park, which has been
identified in the City’s General Plan as an actionable project.

In the following asset inventory and specific site
recommendations, the proposed park projects are listed
along with the overarching project goal, or goals, with which they are aligned.
protect
and
support
demands
in
service
foster
connection
community
identity
Packet Page 2558
37 Newark Citywide Parks Master Plan

ADDITIONAL THEMES
In addition to the overarching goals, project recommendations incorporate the following themes as elements of a successful park network.

Accessibility
Accessibility is applied in all recommendations made in the Citywide Parks Master Plan. Accessibility incorporates ease of access in a variety of ways, including physical accessibility, social inclusion, multi-generational use, and signage and way-finding. Accessibility ensures that all community users will benefit from improvements to the City’s park system.

Sustainability
Sustainability is applied using best practices in design and operation of park project recommendations. This is applied through the recommended use of lasting materials and environmentally conscious operation standards.

Maintenance and Management
Improved maintenance and management of the park system are key elements in ensuring a lasting network of recreational open space. Park project recommendations include the need for the City to actively manage and maintain facilities. Ease of maintenance may also include increased community stewardship.

5.3 ASSET INVENTORY AND SPECIFIC SITE

RECOMMENDATIONS
The following section reviews the park projects proposed in the Citywide Parks Master Plan. The recommendations are organized alphabetically per City park and include the park’s location and size, the opportunities and vision of the park’s plan, specific project recommendations, alignment with the overarching goals of the Master Plan, and total cost at a schematic level. It is assumed that the implementation of these recommendations will be phased at the City’s discretion. High priority projects will be discussed in detail in the next section.

Packet Page 2559

BAYSHORE PARK PROPOSED

EXISTING
38Newark Citywide Parks Master Plan
Figure 2 – Bayshore Park
Packet Page 2560
39 Newark Citywide Parks Master Plan

BAYSHORE PARK (TOD)
Location: Enterprise Drive at Hickory Street
Size: 5 acres
Use: Proposed Community Park

OPPORTUNITIES AND VISION
The proposed Bayshore Park, located at the western edge of the City, is envisioned as a community park for Newark. The currently undeveloped open space is cited in the 2010 Dumbarton TOD Specific Plan as a site for one of three proposed parks in the planned Dumbarton transit oriented development, serving the area west of the proposed transit center while providing a connection to the existing Bay Trail along Willow Street.

According to the Dumbarton TOD plan, the three proposed parks may include restroom facilities, a dog park, and/or an outdoor amphitheater.

The Newark Citywide Parks Master Plan envisions Bayshore Park to be a community recreation facility serving the proposed TOD development with a dog park, restroom, and group picnic areas and associated amenities such as play areas. Additionally, due to the site’s unique location and relationship to Bay wetlands, the Bayshore Park may include environmentally complementary features such as vegetated water treatment swales. Developing the proposed Bayshore Park will satisfy the goals of the Dumbarton TOD Specific Plan and provide the Newark community with a valuable recreation amenity.

RECOMMENDATIONS AND PROPOSED PROJECTS
The following projects are recommended at the proposed Bayshore Park:
• 1 dog park, with separated small and large dog areas
• 2 sheltered group picnic areas, with potential for reservation • 1 school-age play area
• 1 tot-age play area
• 1 restroom
• Meandering pathway system with potential connection to Bay Trail, to the north
• Vegetated water treatment swales
• Planting and irrigation
• Parking lot

ALIGNED MASTER PLAN GOALS
demands
in
service

community
identity

ESTIMATE OF COST
$3,300,000
Packet Page 2561
40 Newark Citywide Parks Master Plan
Figure 3 – Birch Grove Park
*In the detail design process the potential of adding youth baseball fields, with dirt infields, should be considered. This consideration should consider the relative level of utilization of different field types.

Packet Page 2562
41 Newark Citywide Parks Master Plan

BIRCH GROVE PARK
Location: Birch Street at Robertson Avenue
Size: 15 acres
Use: Community Park

OPPORTUNITIES AND VISION
Birch Grove Park is a community park in eastern Newark with a variety of existing amenities including grass fields, pedestrian pathways, playgrounds, restroom, group picnic areas, half court basketball, softball field, and tennis courts. The Newark Citywide Parks Master Plan envisions Birch Grove Park to remain a community recreation facility while enhancing the site’s capacity to meet the identified recreational needs of the Newark community. The Master Plan proposes Birch Grove Park to have a community dog park, dedicated bike skills park, and two turf multi-sport fields as major community-serving projects. Additionally, the Master Plan proposes the creation of a reservable group picnic area and associated amenities such as volleyball and bocce ball courts. The site’s existing playgrounds and water play feature should additionally be updated to best meet the City’s recreation standards.

RECOMMENDATIONS AND PROPOSED PROJECTS
The following updates and projects are recommended at Birch Grove Park:
• 1 dog park, with separated small and large dog areas
• 1 dedicated bike skills park
• 2 natural turf, multi-sport fields (140 ft x 200 ft)
• 1 sheltered group picnic area, with potential for reservation • 1 volleyball court
• 2 bocce ball courts
• 1 updated school-age play area
• 1 updated tot-age play area
• 1 splash pad
• Planting and irrigation

ALIGNED MASTER PLAN GOALS
protect
and
support

demands
in
service

community
identity

ESTIMATE OF COST
$3,400,000
Packet Page 2563
42 Newark Citywide Parks Master Plan
Figure 4 – Byington Park
Packet Page 2564
43 Newark Citywide Parks Master Plan

BYINGTON PARK
Location: Central Avenue at Byington Drive
Size: 3 acres
Use: Neighborhood Park

OPPORTUNITIES AND VISION
Byington Park is a designated neighborhood park that was planned as a component of the adjacent housing development. The site contains existing park amenities including a group picnic area, grass field, half court basketball, school-age play area, and splash pad. To enhance the site as a component of Newark’s park system, the Newark Citywide Parks Master Plan proposes the update of Byington Park’s existing playground and adjacent water play area.

RECOMMENDATIONS AND PROPOSED PROJECTS
The following updates are recommended at Byington Park:
• 1 updated school-age play area
• 1 updated splash pad

ALIGNED MASTER PLAN GOALS
protect
and
support

ESTIMATE OF COST
$900,000
Packet Page 2565
44 Newark Citywide Parks Master Plan
Figure 5 – Cedar Boulevard Linear Park 1
Packet Page 2566
45 Newark Citywide Parks Master Plan

CEDAR BOULEVARD LINEAR PARK
Location: Cedar Boulevard from Willow Street to Haley Street Size: 8.5 acres
Use: Community Park

OPPORTUNITIES AND VISION
Cedar Boulevard is an arterial roadway that circulates throughout the City of Newark, currently terminating at Haley Street. The City, however, has preserved right-of-way for a future extension of Cedar Boulevard to Thornton Avenue. This extension provides potential to create a linear parkway with pathways for dedicated pedestrian and bicycle travel.

To extend the parkway completely, the extension also necessitates the construction of a bicycle and pedestrian bridge over the Union Pacific Railroad.

The Newark Citywide Parks Master Plan sees the development of the Cedar Boulevard Linear Park as an opportunity to provide additional park facilities to the City. The Master Plan envisions Cedar Boulevard Linear Park to be a neighborhood-serving community park, divided into four segments of recreational open space connected through continuous pedestrian circulation. Amid the four segments of the linear park, the Master Plan proposes that Cedar Boulevard Linear Park include a community garden, dedicated bicycle and pedestrian pathways, and outdoor fitness areas as major community-serving features. Additionally, the Master Plan proposes three play areas to serve adjacent neighborhoods, and two decorative gardens for unique and local planting opportunities.

A bike and pedestrian bridge over the Union Pacific Railroad will be necessary to complete the extension between Willow Street and Haley Street.

The creation of the Cedar Boulevard Extension is a priority project to the City, referenced in the City’s General Plan through the Parks, Recreation and Open Space and Transportation Elements, and the FY 2014-2016 Capital Improvement Plan. Completing the Cedar Boulevard Linear Park will provide enhanced bike and pedestrian connectivity while serving the community’s recreation and open space needs.

RECOMMENDATIONS AND PROPOSED PROJECTS
The following projects are recommended at the proposed Cedar Boulevard Linear Park:
• 2 school-age play areas
• 1 tot-age play area
• 2 decorative gardens
• 1 community garden
• 4 outdoor fitness areas
• Bike and pedestrian pathway
• Pedestrian overpass
• Planting and irrigation

ALIGNED MASTER PLAN GOALS
demands
in
service

community
identity

foster
connection

ESTIMATE OF COST
$4,000,000
Packet Page 2567
46 Newark Citywide Parks Master Plan
Figure 6 – Cedar Boulevard Linear Park 2
Packet Page 2568
47 Newark Citywide Parks Master Plan
Figure 7 – Cedar Boulevard Linear Park 3
Packet Page 2569
48 Newark Citywide Parks Master Plan
Figure 8 – Cedar Boulevard Linear Park 4
Packet Page 2570
49 Newark Citywide Parks Master Plan
this page is intentionally blank
Packet Page 2571
50 Newark Citywide Parks Master Plan
Figure 9 – Civic Center Park
Packet Page 2572
51 Newark Citywide Parks Master Plan

CIVIC CENTER PARK
Location: Civic Terrace Avenue at Newark Boulevard
Size: 5 acres
Use: Neighborhood Park

OPPORTUNITIES AND VISION
Civic Center Park is a 5 acre neighborhood park in central Newark, adjacent to the City’s city hall and public library. The park currently has grass lawn, a perimeter path, two group picnic areas, a full court basketball, and a playground. The Newark Citywide Parks Master Plan envisions Civic Center Park to remain neighborhood oriented while improving the site as a civic destination through the addition of additional public gathering space. The Master Plan proposes Civic Center Park to include a small turf multi-sport field and a sheltered group picnic area as major community-serving projects. As amenities associated with the group picnic area, the Master Plan also proposes the addition of a volleyball court and an updated school-age play area. If the Newark Library is to be moved per future planning, Civic Center Park may also have a restroom.

RECOMMENDATIONS AND PROPOSED PROJECTS
The following updates and projects are recommended at Civic Center Park:
• 1 natural turf, multi-sport field (140 ft x 200 ft)
• 1 sheltered group picnic area, with potential for reservation • 1 volleyball court
• 1 updated school-age play area
• 1 restroom (to be added if Newark Library is relocated) • Planting and irrigation

ALIGNED MASTER PLAN GOALS
protect
and
support

demands
in
service

community
identity
Estimate of Cost $1,200,000
Packet Page 2573
52 Newark Citywide Parks Master Plan
Figure 10 – Dumbarton Neighborhood Park
Packet Page 2574
53 Newark Citywide Parks Master Plan

DUMBARTON NEGHBORHOOD PARK (TOD)
Location:

Size: 2.5 acres
Use: Proposed Neighborhood Park

OPPORTUNITIES AND VISION
The proposed Dumbarton Neighborhood Park, located in western Newark, is envisioned as a neighborhood park for the City. The land, owned by chemical distributor Gallade Chemical, is cited in the 2010 Dumbarton TOD Specific Plan as a site for one of the three proposed parks in the planned Dumbarton transit oriented development.

The schematic plan for the TOD project, created in 2014, proposes a group picnic site, a school-age play area, pathway for pedestrian circulation, bio swale plantings, and lawn and irrigation.

RECOMMENDATIONS AND PROPOSED PROJECTS
The following projects are recommended at Dumbarton Neighborhood Park:
• 1 un-sheltered group picnic area, with potential for reservation • 1 school-age play area
• Pedestrian pathway
• Planting and irrigation

ALIGNED MASTER PLAN GOALS
demands
in
service

community
identity

ESTIMATE OF COST
$700,000
Packet Page 2575
54 Newark Citywide Parks Master Plan
Figure 11 – Jerry Raber Ash Street Park
Packet Page 2576
55 Newark Citywide Parks Master Plan

JERRY RABER ASH STREET PARK
Location: Enterprise Drive at Filbert Street
Size: 6 acres
Use: Neighborhood Park

OPPORTUNITIES AND VISION
Jerry Raber Ash Street Park is a community-serving neighborhood park in western Newark. The park is a well-used and active recreation facility - with existing amenities including sheltered group picnic areas, playgrounds, full court basketball, grass lawn, pedestrian paths, two softball pitches, and restroom. The site additionally includes the privately operated Viola Blythe Community Service Center of Newark, a Head Start preschool facility, and a segment of the Hetch Hetchy right-of-way under the jurisdiction of the San Francisco Public Utilities Commission.

The Newark Citywide Parks Master Plan envisions Jerry Raber Ash Street Park to remain a neighborhood park while enhancing the site’s recreational capacity to meet the active needs of the park’s existing users and the community of Newark. The Newark Parks Master Plan proposes several projects to strengthen the site’s capacity as a recreational facility.

These projects include the creation of a natural turf multi-sport field, an additional group picnic site, a volleyball court, and updated playgrounds.

Additionally, a decorative garden and several bocce ball courts are proposed. These latter projects are designed with intent to collaborate with the Clark W. Redeker Newark Senior Center, neighboring the park site. Importantly, the proposed decorative garden is located along the park’s Hetch Hetchy right-of-way segment, utilizing the open space at the utility easement in a passive and non-disruptive, yet activating, manner.

RECOMMENDATIONS AND PROPOSED PROJECTS
The following updates and projects are recommended at Jerry Raber Ash Street Park:
• 1 natural turf, multi-sport field (140 ft x 200 ft)
• 1 un-sheltered group picnic area, with potential for reservation • 1 volleyball court
• 4 bocce ball courts
• 1 updated school-age play area
• 1 updated tot-age play area
• 1 decorative garden
• Planting and irrigation

ALIGNED MASTER PLAN GOALS
protect
and
support

demands
in
service

community
identity

ESTIMATE OF COST
$1,000,000
Packet Page 2577
56 Newark Citywide Parks Master Plan
Figure 12 – Lakeshore Park 1
Packet Page 2578
57 Newark Citywide Parks Master Plan

LAKESHORE PARK
Location: Lake Boulevard at Parkshore Drive
Size: 26 acres (10 acres turf, 16 acres water)
Use: Neighborhood Park

OPPORTUNITIES AND VISION
Lakeshore Park is a neighborhood park located in northwest Newark.

The park is comprised of a man made body of water surrounded by a perimeter network of pedestrian pathways and grass lawn. The Newark Citywide Parks Master Plan envisions the activation of Lakeshore Park through an updated parcourse fitness trail and improved recreation amenities for community gathering.

The Master Plan recommends the creation of a new school-age play area, and associated seating, as well as four new outdoor fitness areas to create an active pedestrian and fitness circuit along the perimeter of the park.

Additionally, an update to the site’s existing restroom and boathouse is recommended to better serve user needs.

RECOMMENDATIONS AND PROPOSED PROJECTS
The following updates and projects are recommended at Lakeshore Park:
• 1 school-age play area and seating area
• 4 outdoor fitness areas
• Updated boathouse and restroom
• Planting and irrigation

ALIGNED MASTER PLAN GOALS
protect
and
support

demands
in
service

ESTIMATE OF COST
$1,700,000
Packet Page 2579
58 Newark Citywide Parks Master Plan
Figure 13 – Lakeshore Park 2
Packet Page 2580
59 Newark Citywide Parks Master Plan
Figure 14 – Lakeshore Park 3
Packet Page 2581
60 Newark Citywide Parks Master Plan
Figure 15 – Lakeshore Park 4
Packet Page 2582
61 Newark Citywide Parks Master Plan
this page is intentionally blank
Packet Page 2583
62 Newark Citywide Parks Master Plan
Figure 16 – Mayhews Landing Park
Packet Page 2584
63 Newark Citywide Parks Master Plan

MAYHEWS LANDING PARK
Location: Cherry Street at Montcalm Avenue
Size: 8 acres
Use: Neighborhood Park

OPPORTUNITIES AND VISION
Mayhews Landing Park is a designated neighborhood park near central Newark with existing recreational amenities that include grass lawn, a perimeter path, playgrounds, an un-sheltered group picnic site, and full court basketball. To enhance the site as a part of Newark’s park system, the Newark Citywide Parks Master Plan proposes the update of Mayhews Landing Park’s existing playgrounds and the addition of a volleyball court as an amenity associated with the existing group picnic area.

RECOMMENDATIONS AND PROPOSED PROJECTS
The following updates and projects are recommended at Mayhews Landing Park:
• 1 updated school-age play area
• 1 volleyball court

ALIGNED MASTER PLAN GOALS
protect
and
support

ESTIMATE OF COST
$1,000,000
Packet Page 2585
64 Newark Citywide Parks Master Plan
Figure 17 – Mirabeau Park
Packet Page 2586
65 Newark Citywide Parks Master Plan

MIRABEAU PARK
Location: Haley Street at Mirabeau Drive
Size: 6 acres
Use: Neighborhood Park

OPPORTUNITIES AND VISION
Mirabeau Park is designated a neighborhood park located in northwest Newark. The site’s existing recreation amenities include grass lawn, pedestrian paths, and a playground. To enhance the site as a component of Newark’s park system, the Newark Citywide Parks Master Plan proposes the update of the existing playground and the addition of a volleyball court and half court basketball to activate the site for enhanced recreational use.

RECOMMENDATIONS AND PROPOSED PROJECTS
The following updates and projects are recommended at Mirabeau Park:
• 1 updated school-age play area
• 1 volleyball court
• 1 half court basketball

ALIGNED MASTER PLAN GOALS
protect
and
support

demands
in
service

ESTIMATE OF COST
$600,000
Packet Page 2587
66 Newark Citywide Parks Master Plan
Figure 18 – Musick Park
Packet Page 2588
67 Newark Citywide Parks Master Plan

MUSICK PARK
Location: Musick Avenue at Cedar Boulevard
Size: 1 acre
Use: Neighborhood Park

OPPORTUNITIES AND VISION
Musick Park is a 1 acre neighborhood park located in northeast Newark.

The park’s existing amenities include grass lawn, a playground, and a pedestrian path utilized for passive recreation. The Newark Citywide Parks Master Plan recommends the update of the existing playground and the addition of seating as well as a perimeter fence. Fencing is recommended due to the high traffic volume on Cedar Boulevard. These features will improve user comfort and safety and enhance the site as a component of the City’s larger park network.

RECOMMENDATIONS AND PROPOSED PROJECTS
The following updates and projects are recommended at Musick Park:
• 1 updated school-age play area
• Seating
• Perimeter fence

ALIGNED MASTER PLAN GOALS
protect
and
support

ESTIMATE OF COST
$700,000
Packet Page 2589
68 Newark Citywide Parks Master Plan
Figure 19 – Newark Community Park
Packet Page 2590
69 Newark Citywide Parks Master Plan

NEWARK COMMUNITY PARK
Location: Cedar Boulevard at Chapman Drive
Size: 16 acres
Use: Community Park

OPPORTUNITIES AND VISION
Newark Community Park is one of the City’s largest and most active community parks. Located in northern Newark, the park contains grass lawn, pedestrian pathways, playgrounds, picnic areas, full court basketball, wall ball, tennis courts, and a restroom. The park is adjacent to the City’s Community Center.

The Newark Citywide Parks Master Plan envisions Newark Community Park to be a community open space with destination recreation features that will increase the site’s capacity to meet the City’s identified recreational needs. The Master Plan proposes the park to have a community dog park, accessible multi-age playgrounds, and reservable picnic sites. It is also recommended that the proposed picnic sites provide associated recreation features including volleyball courts, basketball, and an updated restroom. The addition of the proposed updates and recreation projects will enhance the park’s ability to meet the community’s current and future recreational needs.

RECOMMENDATIONS AND PROPOSED PROJECTS
The following updates and projects are recommended at Newark Community Park:
• 1 dog park, with separated small and large dog areas
• 4 sheltered group picnic areas, with potential for reservation • 2 updated school-age play areas
• 1 updated tot-age play area
• 1 tot-age play area
• 2 volleyball courts
• 1 full court basketball
• Updated restroom
• Planting and irrigation

ALIGNED MASTER PLAN GOALS
protect
and
support

demands
in
service

community
identity

ESTIMATE OF COST
$4,200,000
Packet Page 2591
70 Newark Citywide Parks Master Plan
Figure 20 – Shirley Sisk Grove
Packet Page 2592
71 Newark Citywide Parks Master Plan

SHIRLEY SISK GROVE
Location: Cedar Boulevard at North Magazine
Size: 2 acres
Use: Special Use Park

OPPORTUNITIES AND VISION
Shirley Sisk Grove is designated a special use park located in southwest Newark. The Grove has been host to the City’s summer concert for nearly thirty years, despite the site’s lack of permanent recreation facilities, utilities, or on-site parking. The Newark Citywide Parks Master Plan envisions Shirley Sisk Grove as a permanent, outdoor performance space for Newark’s community. The suggested improvements include the placement of a permanent outdoor stage and stage shelter, a permanent restroom, storage for event materials, and planting and irrigation for outdoor seating. To further improve the Grove the Master Plan also proposes the creation of a play area and an on-site parking lot to improve site accessibility.

RECOMMENDATIONS AND PROPOSED PROJECTS
The following projects are recommended at Shirley Sisk Grove:
• 1 outdoor amphitheater, including outdoor stage and stage shelter • 1 storage
• 1 school-age play area
• 1 restroom
• Pedestrian pathway
• Planting and irrigation
• Parking lot

ALIGNED MASTER PLAN GOALS
protect
and
support

demands
in
service

community
identity

foster
connection

ESTIMATE OF COST
$2,000,000
Packet Page 2593
72 Newark Citywide Parks Master Plan
Figure 21 – Sportsfield Park 1
*In the detail design process the potential of adding youth baseball fields, with dirt infields, should be considered. This consideration should consider the relative level of utilization of different field types.

Packet Page 2594
73 Newark Citywide Parks Master Plan

SPORTSFIELD PARK
Location: Mowry Boulevard at Cherry Street
Size: 30 acres
Use: Community Park

OPPORTUNITIES AND VISION
Newark’s Sportsfield Park is a community park located in south. The Silliman Activity and Family Aquatic Center, Newark’s community fitness facility, is within the park. With its active turf fields, Sportsfield Park is the City’s largest dedicated sport facility, regularly hosting soccer, baseball and softball events throughout the year. Sportsfield Park is currently home to grass lawn for recreation and competitive field sports, a youth baseball and softball field, a perimeter pedestrian path, and restroom.

The Newark Citywide Parks Master Plan envisions Sportsfield Park as a destination sport and recreation facility for the City of Newark. The Master Plan proposes that the park provide an all-weather artificial turf fields, a community skate park, and several updated natural turf fields as major community-serving projects. Additional proposed facilities include group picnic areas, playgrounds that incorporate traditional and water play features, a concession stand with restroom, updated pedestrian pathways, and an extended parking lot to serve additional demand. The application of these recommendations will greatly aid in meeting the identified recreational need of the Newark community.

RECOMMENDATIONS AND PROPOSED PROJECTS
The following updates and projects are recommended at Sportsfield Park.

The extent of these improvements will require a phasing plan:
• All-weather, multi-used artificial turf sports fields • Skate park
• 4 natural turf, multi-sport field (140 ft x 200 ft)
• 2 natural turf, multi-sport field (200 ft x 300 ft)
• 2 natural turf, regulation soccer field (210 ft x 330 ft) • 1 sheltered group picnic area
• 1 un-sheltered group picnic area
• 1 school-age play area
• 1 splash pad
• Updated pedestrian pathway
• 1 restroom and concession stand
• Planting and irrigation
• Parking lot

ALIGNED MASTER PLAN GOALS
protect
and
support

demands
in
service

community
identity

foster
connection

ESTIMATE OF COST
$9,000,000
Packet Page 2595
74 Newark Citywide Parks Master Plan
Figure 22 – Sportsfield Park 2
*In the detail design process the potential of adding youth baseball fields, with dirt infields, should be considered. This consideration should consider the relative level of utilization of different field types.

Packet Page 2596
75 Newark Citywide Parks Master Plan
this page is intentionally blank
Packet Page 2597
76 Newark Citywide Parks Master Plan
Figure 23 – Susan Johnson Bridgepointe Park
Packet Page 2598
77 Newark Citywide Parks Master Plan

SUSAN JOHNSON BRIDGEPOINTE PARK
Location: Spruce Street at Bridgepointe Drive
Size: 4 acres
Use: Neighborhood Park

OPPORTUNITIES AND VISION
Susan Johnson Bridgepointe Park is a neighborhood park located along the northwest edge of Newark. Currently the park has grass lawn, a playground, and two group picnic areas. To activate the site, while better meeting the identified recreation need in the City, the Newark Citywide Parks Master Plan proposes the creation of half court basketball and a volleyball court as well as an update to the existing playground.

RECOMMENDATIONS AND PROPOSED PROJECTS
The following updates and projects are recommended at Susan Johnson Bridgepointe Park:
• 1 updated school-age play area
• 1 half court basketball
• 1 volleyball court

ALIGNED MASTER PLAN GOALS
protect
and
support

demands
in
service

ESTIMATE OF COST
$900,000
Packet Page 2599
this page is intentionally blank
Packet Page 2600

IMPLEMENTATION
1 2 3 4 5 6 7
Packet Page 2601
80 Packet Page 2602
81 Newark Citywide Parks Master Plan

SECTIONS

6.1 Proposed Projects

6.2 Priority Projects

6.3 Financial Analysis and Management

6.4 Capital Project Funding

6.1 PROPOSED PROJECTS
92 individual park projects were identified throughout the planning process, available for prioritized review in Appendix F. These projects range in variety of recreation provided and are listed below:
• All-Weather Turf Fields
• Amphitheater
• Bike Skills Park
• Community Garden
• Decorative Gardens
• Dog Parks
• Grass Turf Fields
• Group Picnic Areas
• Skate Park
• Splash Pads
This section provides information on the project types proposed in the Citywide Parks Master Plan; their location and description, as well as their cost considerations, necessary standards of maintenance, operating cost models, and potential revenue analyses.

Table 3 reports the probable annual maintenance cost, per proposed project.

Table 3 – Estimated Maintenance Costs
Project Annual Maintenance
Low High
All-Weather Turf Field (each) $9,000 $11,000
Lights $2,000 $3,000
Shirley Sisk Grove $13,000 $16,000
Bike Skills Park $12,000 $19,000
Community Garden $3,000 $6,000
Decorative Gardens $19,000 $32,000
Dog Parks $34,000 $56,000
Grass Turf Fields $231,000 $236,000
Group Picnic Areas $81,000 $87,000
Skate Park $6,000 $8,000
Splash Pads $6,000 $12,000
CHAPTER 6: IMPLEMENTATION
Packet Page 2603
82 Newark Citywide Parks Master Plan

ALL-WEATHER TURF FIELDS
Site
Sportsfield Park
Description
This proposed project creates 260,000 sf of lit, all-weather fields constructed from a synthetic grass-like material, replacing grass turf currently utilized as sport fields at Newark’s Sportsfield Park. The proposed facility will host 2 regulation soccer fields, and 1 baseball pitch (overlaid on the soccer fields), but will allow for the flexible layout of additional fields as needed.

Typically all-weather turf fields utilize polyethylene as an alternative to natural grass, as it does not require the care and maintenance needs of traditional seeding. Lighting additionally maximizes use of these sport fields, beyond the limitation of dusk. All-weather fields can substantially increase the hours that fields are available for use by extending daily hours of play and increasing the number of days that fields can be used throughout the year. Synthetic turf also does not require the resting periods needed by natural turf or the loss of days used due to inclement weather.

Cost Considerations
Cost savings are achieved as a result of less on-going maintenance and the reduction in water usage over grass fields. However, the initial cost for synthetic turf installation and future replacement costs are significant.

Field Lighting
To model the operating cost of lighting at the proposed project, a lighting level of 30 footcandles for all the fields is assumed. Perimeter lighting of the 6 acres of turf fields is proposed with 4 poles with approximately 24 fixtures (light bulbs on the poles), with each energy-efficient fixture consuming 1.5 kW per hour. Based on a standard $0.06 per kW rate, and an assumed 826 hours (see operating assumptions) of annual usage, the anticipated annual energy cost is $1,500 per year or $2.00 per hour for all lights. If the switching, or monitoring, allows fields to be individually lit, there could be an additional energy savings.

Operating Cost Model
Table 4 identifies the likely costs for maintenance of lit, all-weather fields.

Packet Page 2604
83 Newark Citywide Parks Master Plan
Table 4 – Operating Cost Model per Field
Annual Maintenance
Mowing $0
Irrigation Repair $0
Blowing Debris and Trash $2,000
Annual Turf Repair and Striping $1,500
Over-seeding $0
Aeration $0
Infill for Synthetic Turf $500
Materials - Antimicrobial $200
Water Use $1,000
Grooming the Fields (6 x per year) $3,600
Estimated Annual Maintenance Cost $8,800
Potential Revenue Analysis
Currently, community demand for field use in the City is high and cannot be met by the existing fields, with highest demand among youth sport organizations year-round. It is expected that completing this proposed project will aide demand while providing revenue to the City of Newark.

As the proposed recreation fields will overlap on the artificial turf, the site will only accommodate one seasonal sport use at a time. For example, when the baseball pitch field is scheduled for use, the regulation soccer fields will not be available. However, 2 fields will be available for soccer at the same time. The regulation soccer fields may be featured as showcase facilities for tournaments.

The City currently has a fee structure in place for field user groups based on rates that are considered highly subsidized. In FY 2015-2016, the revenue generated from Newark Soccer Club’s use of Sportsfield Park and MacGregor Playfields was $22,415 with all other user groups (various youth and adult groups) generating an additional $21,524, totaling $43,394, according to City staff. However, the addition of the proposed synthetic turf fields provides an opportunity for extended hours, year-round play, and potential to increase user fee revenue to help offset operating costs. For this analysis, the underlying assumption is the proposed fields will be used 80% during the Spring and Summer, and 60% during the Fall and Winter.

The scenario below is an example of the revenue that could be generated based on the assumptions presented.

Assumptions
The following figures are based on park schematics developed by the Consultant and the City of Newark. The preliminary operating assumptions are summarized below.

General Operating Assumptions
• Time of year determines primary sport playing priority due to sport seasons
• Tournaments will be held on weekends, with primary community use on weekdays
• Field availability will be 360 days per year
• Field availability may not be used to capacity due to non-primetime hours demand, such as school and work hours, resulting in a percentage of rental time
• Operating Hours: Monday-Thursday 8am-9pm
Friday-Saturday-Sunday 8am-10pm
Fee Assumptions
• The rates are based on community use during the weekday and tournament use (primetime) on weekends
• Proposed rates are comparable to neighboring cities with all-weather fields. Rates are based on single category/group classification. Fee Packet Page 2605
adjustments for group categories will impact recovery rates 84 Newark Citywide Parks Master Plan
Potential Program Uses
• Camps and clinics
• Sports and recreation lessons
• Community events
Table 5 – Revenue Potential from User Fees of All-Weather Fields Field Use Revenue
Per Day Field
Availability
Average
Hrs Per
Day
No. of
Days
per
Year
Annual
No. Of
Hrs
% of
Hrs
Used
Estimated
Total No.
of Hrs
Used
Rental
Fees/
Hr
Totals
Weekday (MondayThursday)-Spring/
Summer
12 104 1248 80% 998 $50 $49,900
Weekday (MondayThursday)-Fall/
Winter
12 103 1236 60% 742 $50 $37,100
Weekend (FridaySunday)-Spring/
Summer
14 76.5 1,071 80% 857 $65 $55,705
Weekend (FridaySunday)-Fall/Winter 14 76.5 1,071 60% 643 $65 $41,795 Revenue from User
Fees Per Year 3,240 $184,500
*Assumption is soccer field use
Table 6 – Revenue Potential from Lighting Usage Fees
Field Use Revenue
Per Day Field
Availability
Average
Hrs Per
Day
No. of
Days
per
Year
Annual
No. Of
Hrs
% of
Hrs
Used
Estimated
Total No.
of Hrs
Used
Rental
Fees/
Hr
Totals
Weekday (MondayThursday)-Spring/
Summer
2 104 208 80% 166 $25 $4,150
Weekday (MondayThursday)-Fall/
Winter
4 103 412 60% 247 $25 $6,175
Weekend (FridaySunday)-Spring/
Summer
3 76.5 230 80% 183 $25 $4,580
Weekend (FridaySunday)-Fall/Winter 5 76.5 383 60% 230 $25 $5,750 Revenue from
Lighting Usage Fees
Per Year
826 $20,655
Packet Page 2606
85 Newark Citywide Parks Master Plan
Table 7 – Rental Rate Comparisons for Synthetic Turf Fields Field Use Rental Rates
Newark Sportsfield Park & Birch Grove
Park - no lights
$25-$45/hr
Resident
$35-$50/hr
Non-Resident
Sportsfield Park & Birch Grove
Park - with lights
$50-$75/hr
Resident
$60-$90/hr
Non-Resident
Fremont Synthetic Turf- Central Park -
no lights
$57/hr
Group 3
$102/hr
Group 4
Synthetic Turf-Central Park -
with lights
$82/hr
Group 3
$127/hr
Group 4
Karl Nordvik Park -Full FieldSynthetic Turf- no lights$38/hr Group 3
$68/hr
Group 4
Karl Nordvik Park -Full Fieldwith Lights$63/hr
Group 3
$93/hr
Group 4
Union City Synthetic Turf- no lights $15/hr
Youth NP
$50/hr
Resident
Synthetic Turf- with lights
$15/hr + $27/hr
light fee
Youth NP
$50/hr + $32.50/hr
light fee
Resident
Fee Average: No Lights $33.75/hr $63.75/hr
With Lights $59.25/hr $90.65/hr
The City of Fremont, which hosts a tournament facility with 10 sport fields, has the following group rate descriptions:
• Group 3: Fremont Non-Profit Organizations with tax ID serving the community
• Group 4: Fremont resident groups and non-resident, non-profit organizations with a tax ID
• Group 5: Non-Fremont resident groups
Union City has the following Group Rate Descriptions:
• Youth Non-Profit (NP) with Special Use
• Adult Non-Profit (NP) with Special Use
• Union City Residents
• Non-Resident
It is considered best practice to have a 2-hour minimum on light usage fees.

Packet Page 2607
86 Newark Citywide Parks Master Plan

AMPHITHEATER
Site
Shirley Sisk Grove
Description
The proposed improvements to Shirley Sisk Grove will replace and expand the existing temporary facilities to provide a permanent venue for the site’s existing concert and performing art series, creating a permanent community outdoor amphitheater. The proposed enhancements will include a fixed restroom, band shell, storage, play area, parking, and grass lawn for outdoor seating.

Shirley Sisk Grove has hosted the City’s free summer concert series since its inception in 1987. Currently the site consists of approximately 2 acres of unimproved open space without permanent facilities or services such as a stage, restroom, or on-site electricity. To support the concert series, portable equipment is provided and installed on site. Additionally, the site has limited ease of access and no permanent parking for events.

Outdoor amphitheaters are valuable community assets that promote community cohesion, support of cultural arts, and connection to available natural resources.

Cost Considerations
City-sponsored summer concert series are popular in communities throughout the Bay Area, however cost considerations specific to the maintenance and sustainability of outdoor amphitheaters must be considered in the financial analysis of this project.

To minimize or manage maintenance costs of the proposed project, the City should:
• Provide adequate drainage to prevent standing water on turf • Incorporate a method to close the site during inclement weather • Open the facility only when programmed or reserved
• Provide a trash enclosure to contain debris and garbage • Install hand-washing stations outside of the restrooms for easy access Additionally, as an enhanced outdoor venue, there are limitations to yearround programming due to weather constraints.

Standard of Maintenance
For sustained use of the enhanced site, the City will need to adopt maintenance standards for the venue. Typical maintenance needs for an outdoor amphitheater include:
• Refuse pick-up and garbage removal
Packet Page 2608
87 Newark Citywide Parks Master Plan
• Signage maintenance
• Path maintenance
• Restroom cleaning and stocking
• Graffiti removal, as required
• Stage cleaning
• Landscape maintenance
• Routine inspection
Operating Cost Model
The 2016 National Recreation and Park Association (NRPA) Field Report reports that median expenditures for maintenance of parkland is nearly $6,480 per acre. Based on this national median, maintenance expense for the 2 acre site and proposed amenities are expected to range from $13,000 to $16,000, annually.

Although not a maintenance expense, it is important to note that a contractor is currently retained to provide entertainment and production services for the summer concert series. The 2016 Summer Series contractor agreement provided the following services at a cost of $25,250.1
• 4 live professional musical entertainment events
• On-site sound and stage managers
• Set-up and maintenance of stage for each concert
• All sound, audio and electrical equipment and set-up
Funding was provided by Newark Betterment Corporation and local businesses and organizations including Homewood Suites, The Sign Zone, and Tri-City Voice. The addition of a permanent stage, access to on-site utilities, and other proposed improvements should reduce the annual operating costs at Shirley Sisk Grove.
1 Feb. 25, 2016 Newark Council Staff Report
Potential Revenue Analysis
The existing concert series program has been supported through:
• Corporate and local business in-kind sponsorship
• Newark Betterment Corporation nonprofit funding
• Measure U (utility users tax) to maintain staffing levels For additional revenue potential, the City can consider providing programming at the site. Programming opportunities include a Cityproduced summer series, community theater, or special seasonal events.

However, affordable low-rate programming may generate limited revenue while increasing costs to the City. The City could explore the possibility of non-profit performing arts organizations providing programming and support services to reduce costs. Newark has a history of partnering with the local community, businesses, and organizations to provide the concert series and should continue this arrangement.

Newark may also consider including a rental schedule for large-scale group picnic rentals, school performances, and graduation ceremonies.

Renting the Grove for large group picnics at a fee of $250 for a day use with 10 rentals over the summer (1 per week) could generate $2,500 in fees. Additionally, the popularity of food trucks creates an opportunity to rent parking stall spaces during concerts, generating additional funds.

Table 8 models potential annual revenue based on the aforementioned strategies.

Table 8 – Revenue Potential at Shirley Sisk Grove
Strategy Potential Revenue
Grants $25,000 - $30,000
Group Picnic Rentals $3,000 - $4,000
Total $28,000 - $34,000
Packet Page 2609
88 Newark Citywide Parks Master Plan

BIKE SKILLS PARK
Site
Birch Grove Park
Description
The proposed bike skills park will be the first of its kind in the tri-city area, located at Birch Grove Park in the City of Newark. The project will host several pre-fabricated pump track structures as well as user amenities such as shaded seating. These features will allow users to develop bikehandling skills and to recreate in a space exclusively for this activity.

Bike skills parks are specialized recreational facilities that provide a variety of features used for teaching, training, and competing in bike sports.

Typical bike parks include features such as undulated ramps and surface mounds for users to hone their abilities. Bike skills parks create a safe place to ride without pedestrian and vehicular conflict and allow bike riders to practice skills outside of traditional skate parks. Additionally, bike skills parks host specialized features for users to perform and practice skills while also serving as a community gathering area.

Cost Considerations
The proposed bike skills park will be open during standard park hours, sunrise to sunset, dependent on weather. As the tracks are weather sensitive, similar to grass fields, the facility should be closed during inclement weather. The bike skills park will be fenced and located in a high visibility location within the City’s Birch Grove Park, to limit undesirable uses. Signage will be important to emphasize site rules and frequent inspections of the bike park, in accordance with other park elements, will be important to offset potential maintenance issues. In consideration of cost, the City of Newark should also provide adequate drainage from the site and utilize high quality materials and structures that will sustain use, weather and time.

Standard of Maintenance
For sustained use and success of the proposed project, the City should adopt maintenance standards to ensure the site’s care. Though maintenance requirements vary upon materials used for construction, typical maintenance requirements for bike parks include:
• Cleaning of seating areas
• Structure maintenance
• Landscape maintenance, as necessary
• Litter and debris pick-up, removal of hazardous rocks • Erosion maintenance
• Routine inspection and maintenance of signage, fencing and gates • Storm water control features
• Park closure as needed during inclement weather
Operating Cost Model
As the development of bike skills parks is new to traditional recreation planning, historic maintenance cost data is limited, with costs varying Packet Page 2610
89 Newark Citywide Parks Master Plan
widely. The International Mountain Bicycling Association (IMBA), however, recommends an annual maintenance budget of approximately 3% to 5% of the park’s construction cost. Based upon these guidelines, the annual estimated maintenance cost for the proposed bike skills park would range from $12,000 to $19,000. This estimated annual expense includes maintenance of the structures, park grounds, perimeter fencing and gates, and seating areas. The IMBA, a non-profit educational association, is a resource to the biking community and is active in supporting development of bike skill parks to teach skills and bike safety.

Local benchmarks for comparison include bike facilities supported in the cities of Lafayette and Pleasanton. The proposed Lafayette bike park, at

1.8 acres, is expected to generate maintenance costs of $15,000 annually.

Pleasanton’s dirt, BMX bike park, at 2 acres, generates nearly $7,200 in maintenance costs annually.

The use of volunteers may reduce maintenance costs through organized workdays and the provision of in-kind services.

Potential Revenue Analysis
Admission to a bike skills park is generally without charge. These parks are viewed as community assets with recreational value. Biking programs, classes, skill camps, private rentals, competitions, and exhibitions may be a source of limited revenue. However, the provision of programming may reduce net revenue due to associated program costs to the City.

Revenue potential for the proposed project is estimated to range from $10,000 to $12,000, annually. The following is illustrative of the programming and assumptions made to achieve this projected potential revenue.
• Bike Skill Park Rentals for Parties or Private Events: Revenue Potential $3,000
○ 2 hour rental
○ $125 rental rate
○ 4 rentals per month
○ 6 month spring-summer season
• Morning and Afternoon Skill Camp: Revenue Potential $9,600 ○ 6 half day, week-long camps
○ $160 x 60 participants
○ 10 participants per camp
Packet Page 2611
90 Newark Citywide Parks Master Plan
established gardens serve as horticulture teaching centers with interpretive signage, planting information kiosks, and scheduled programs relating to topics such as composting.

Cost Considerations
To minimize the cost of this proposed project, the City should consider volunteer organizations to aid in the site’s construction and development.

Additionally, the site should utilize weather tolerant materials and provide restrooms (portable or fixed) and hand washing/produce washing stations to encourage long-term participant use.

Standard of Maintenance
For sustained use of the proposed community garden, the City will need to adopt maintenance standards for the project. Community gardens require relatively little maintenance, with standard maintenance practices including:
• Refuse pick-up for offsite disposal
• Irrigation and watering system repairs
• Signage maintenance, if applicable
• Path maintenance
• Fence maintenance
In many cases, however, municipalities interested in developing such a project partner with local organizations, such as garden clubs, to support basic maintenance needs. This often results in basic maintenance tasks included in the community garden’s membership policies, and completed by site users.

COMMUNITY GARDEN
Site
Cedar Boulevard Linear Park
Description
The community garden will be a focal point of the proposed Cedar Boulevard Linear Park. The enclosed garden will provide 43 raised planting beds, irrigation, communal storage, and decomposed granite pathways. This project is expected to be a user-friendly amenity that encourages ownership and food production for personal consumption and contribution. The proposed facility will be member-based with the rental of a garden plot and the expectation that members maintain common areas.

Community gardens are desirable assets that provide not only a safe space to grow produce, but also add aesthetic and cultural vibrancy to their surroundings. Community gardens support community cohesion and gathering, and can also serve as places of environmental education. Some Packet Page 2612
91 Newark Citywide Parks Master Plan
Table 10 – Union City Community Garden Membership Price Plot/Planter at Union City Community
Garden
Annual Membership Fee
Standard Planter: 15’x30’ raised bed $170
Based on the above information, the proposed Newark community garden may be expected to generate $9,374 annually if membership is priced at $218 per person for the 43 plot site. This revenue does not include the potential donation of excess garden food to non-profit organizations, or the potential to showcase a farmers’ market in adjacent areas as a special event.

Operating Cost Model
The projected maintenance costs for this facility are minimal as it is assumed users provide a majority of the daily upkeep. Dependent upon member and volunteer group support, the annual maintenance cost estimate ranges from $3,000 to $6,000.

Potential Revenue Analysis
Plot rentals provide the basis for cost recovery at community gardens.

Comparable rates for cities neighboring Newark follow.

Local Ecology and Agriculture Fremont (LEAF) is a member-based community garden organization in Fremont. This group provides garden plots, at its LEAF Center, to residents of Fremont, Newark and Union City. The cost of plot membership includes water, access to a portable restroom, trash and recycling, and maintenance and repairs. Plot users are members required to assist with the maintenance of the common areas.

LEAF also provides members with classes, demonstrations, workshops, and planting materials for purchase. LEAF’s membership prices are included below.

Table 9 – LEAF Membership Prices
Plot/Planter at LEAF, Fremont Annual Membership Fee
Standard Planter: 4’x12’x18” raised bed $218
ADA Planter: 2’x12’x28” $109
Membership at the Union City Community Garden is prioritized based on members’ residency within the city. This garden maintains 17 plots and membership fees include, water, compost, sand and fertilizer, and gardening tools. As is typical, members of the Union City Community Garden must assist with maintenance and upkeep of the common areas.

Membership prices are included below.

Packet Page 2613
92 Newark Citywide Parks Master Plan

DECORATIVE GARDENS
Sites
Cedar Boulevard Linear Park (12,224 sf)
Jerry Raber Ash Street Park (20,518 sf)

Description
The City proposes 2 decorative gardens along the proposed Cedar Boulevard Linear Park and 1 at Jerry Raber Ash Street Park. These spaces are intended for walking, viewing, and user contemplation. Decorative gardens are developed for public display and viewing and are typically integrated into the landscaping of a larger park.

Traditional features and benefits of decorative gardens include color and vibrancy, place-making, community gathering, and the potential to showcase local and heritage plants and flowers. Decorative gardens can also serve as outdoor horticulture teaching centers with interpretive signage, planting information kiosks, and scheduled programs. When sited in active locations within a park an important design consideration is controlling circulation and access for the protection of the garden elements. Edge-defining walkways to reduce trampling, or decorative fencing are often incorporated.

Cost Considerations
Decorative gardens require increased maintenance, selective and unique planting material, seasonal monitoring, and may have elevated water requirements. For this, a sustainable operations and maintenance plan should be established prior to development. These gardens are typically the first to be considered for funding reductions, or elimination, during periods of budget shortfalls and drought conditions.

Standard of Maintenance
Decorative garden areas require a higher level of maintenance than standard park landscaping. These showcase facilities must be maintained year-round with maintenance tasks typically including:
• Pruning and planting
• Hauling of materials
• Trim mowing, if applicable
• Inspecting
• Mulching and fertilizing
• Pest, disease and weed control
• Trash and debris removal
• Daily care and cleaning
• Signage maintenance, if applicable
Packet Page 2614
93 Newark Citywide Parks Master Plan
Establishing a zero tolerance for trash and debris in these garden areas will demonstrate the standard of care and encourage the community to maintain and cherish the space. Dependent on the type of garden proposed, the sites may require staff specialties and training in the care of these facilities.

Operating Cost Model
Based on the aforementioned maintenance standards, the projected annual maintenance cost for the proposed decorative gardens will range from $0.60 to $1 per square foot of garden. Applying this to the sites at Cedar Linear Boulevard Park and Jerry Raber Ash Street Park, the annual maintenance costs for the City’s decorative gardens will range from $19,000 to $32,000. Costs will depend, and vary, based on the type of gardens created in the City.

Potential Revenue Analysis
The decorative garden is a park feature accessible to the community. The proposed garden at Jerry Raber Ash Street Park provides an opportunity to create programming such as painting, gardening, and photography due to its close proximity to the Newark Senior Center. There is also the opportunity to engage community assistance with the gardens and the City may reduce costs through the use of volunteers. Revenue, however, is not projected for the proposed decorative gardens due to site sizes and no siting of amenities that are necessary for reservable facilities, such as restrooms, gating, and space for food preparation.

Decorative gardens in city park settings have been successful in providing space for venue events such as weddings. These settings require a somewhat secluded area consistent with the event needs. Amenities such as restrooms, electricity, shelter, parking, and access for easy loading and unloading of equipment must be considered. These gardens can be reserved and rented, generating revenue to offset a portion of their cost.

The current locations are not conducive for this type of use, but are intended as spaces for quiet viewing and demonstration of local planting and planting techniques.

Packet Page 2615
94 Newark Citywide Parks Master Plan

DOG PARKS
Sites
Bayshore Park (61,114 sf)
Birch Grove Park (56,559 sf)
Newark Community Park (38,700 sf)
Description
The City of Newark proposes 3 new dog parks located at Bayshore, Birch Grove, and Newark Community Park. The features proposed include benches, shaded seating, fencing, concrete paving, decomposed granite surfacing, and water fountains. All proposed dog parks are unlit and include separated areas for small and large dogs. The proposed dog parks will be open during standard park hours, dawn to dusk, and dog owners will be expected to supervise and clean up after their pets. Including signage at each facility will be important to enforce park standards and rules.

Community dog parks are public facilities specified for use by dogs, and their owners, to exercise, socialize, and play off-leash in a controlled environment. Though dog parks may vary in features, it is standard for these spaces to be fenced, gated, and provide trash and water services; areas must be designated for cleaning supplies, garbage cans, waste bags, and pooper-scooper stations and spaces with water for play or cleaning must provide adequate drainage. Optional, but popular, features include the provision of specified areas to separate large and small dogs, seating, shade structures, lighting, and dog exercise play structures. The inclusion of these features encourages extended use of these facilities. Best practices in dog park design calls for double-gated entry to keep dogs from leaving the secured area and to improve wheelchair access.

Dog parks are valuable community assets that not only provide dogs with a safe space to exercise and socialize, but bring together community members, promote responsible dog ownership, and connect individuals with special interests.

Cost Considerations
A successful dog park requires a high standard of park maintenance and repair to ensure sustained usability. Cost considerations include:
• Underground drainage and replacement of ground surfacing, as needed
• Cleaning and maintenance of seating areas
• Pet waste removal stations and equipment (plastic bags) • Water supply
• Maintenance of shade structures
Standard of Maintenance
To keep costs low and support the facilities, the City should adopt maintenance standards for the proposed dog parks. Routine maintenance for these facilities includes:

Packet Page 2616
95 Newark Citywide Parks Master Plan
• Waste removal
• Sanitation cleaning from dog use
• Signage maintenance
• Painting and repair of features, including fencing, gates, and play structures
• Re-supplying disposable pet waste bags
• Decomposed granite maintenance and replacement
• Water station cleaning
Operating Cost Model
To estimate the annual cost of maintenance for the City’s proposed dog parks, this analysis references local and national standards, finding that the average cost of maintenance ranges from $0.22 to $0.36 per square foot of dog park. Importantly, the number and type of amenities provided at a dog park impact the overall maintenance costs. The City of Fremont’s Central Park Dog Park reports a $22,000 annual maintenance expense for its 72,000 sf dog park, resulting in a cost of about $0.32 per square foot.

Compared to other local dog parks, however, Fremont’s Central Park Dog Park maintenance costs are higher due to special features such as turf.

Newark’s proposed parks will utilize decomposed granite surfacing, rather than turf, to minimize cost.

Based on a projected square foot cost of $0.22, the estimated annual expense to maintain the proposed Newark dog parks follows:

Table 11 – Estimated Annual Dog Park Maintenance Costs
Annual Maintenance
Bayshore Park $13,445
Birch Grove Park $12,443
Newark Community Park $8,514
Total $34,402
To offset the maintenance costs, precedent has shown that cities have collaborated with volunteer organizations for donations and fundraising to pay a portion of the maintenance cost. These organizations often provide volunteer labor and may provide resources and commitment to the dog parks to ensure long-term sustainability.

Potential Revenue Analysis
Dog park access is typically provided free to the community, requiring other revenue strategies for cost recovery. These costs are frequently offset through a partnership with local dog clubs with a vested interest in the facility. These groups may provide supplemental funding and inkind services to offset maintenance costs. Some municipalities consider dog parks as special use and require an annual dog permit and fee to use the park. Dedicated fundraisers and community campaigns may also be effective tools to raise funds through volunteer organizations. The City could choose to move their dog classes and programs to these sites, opening up space at the current locations for other activities.

Revenue potential for the proposed projects is estimated to range from $15,000 to $19,000, annually. The following is illustrative of the programming and assumptions made to achieve this projected potential revenue.
• Dog Training Courses: Revenue Potential $12,000 - $14,000 ○ Basic Obedience: $195 x 6 participants x 6 classes = $7,020 ○ Puppy Program: $83 x 6 participants x 6 classes = $2,988 ○ American Kennel Club (AKC) Good Citizen Program: $83 x 6 participants x 6 classes = $2,988
• Annuals Dog Park Use Permits: Revenue Potential $3,000 - $5,000 ○ Based on an annual use fee of $30 purchased by 20% (158) of the licensed dog owners as reported in 2016 x 158 dogs = $4,7402 2 Note: 20% of the 794 licensed dogs in the City of Newark in 2016 (www.ci.newark.nj.us/ news/january-means-time-renew-dog-licenses)
Packet Page 2617
96 Newark Citywide Parks Master Plan

GRASS TURF FIELDS
Sites
Birch Grove Park 2 Multi-Sport Fields 140’ x 200’
Civic Center Park 1 Multi-Sport Field 140’ x 200’
Jerry Raber Ash Street Park 1 Multi-Sport Field 140’ x 200’ Sportsfield Park 4 Multi-Sport Fields 200’ x 140’
2 Multi-Sport Fields 300’ x 200’
2 Regulation Soccer Fields 330’ x 210’
Description
The City of Newark proposes the creation of new grass turf fields throughout its park system, with the majority of the fields irrigated with underground systems. Though grass playing fields are a popular and reliable source for recreation, they face challenges that impact their use and maintenance. Grass fields are susceptible to weather conditions and require regular closure to allow their rest and prevent overuse. Grass fields are the most common field playing surface provided by municipalities, with lighting occasionally also provided to maximize use. The proposed grass fields will not be lit.

Cost Considerations
Grass fields require regular maintenance and water usage in order to sustain playing field conditions. Grass turf requires resting periods to recover from intense sport use and thereby may experience overuse if the demand for practice and game time is high. Grass fields easily suffer from drought conditions which increases maintenance needs due to gopher holes, bald spots, overuse, and field tracks. Adversely, there is also the loss of days the fields are usable due to weather that renders the turf not viable.

Standard of Maintenance
A minimum standard of maintenance will preserve the proposed fields for public use while addressing safety concerns. This minimum standard includes weekly mowing during seasons of use, weed control, seeding, fertilizing, rolling, topsoil placement, irrigation maintenance, debris cleanup, field drainage maintenance, and special event preparation and cleanup.

Intensification of scheduling and multi-use pushes the limits of turf recovery with excessive foot traffic leading to compaction and bare areas.

The proposed fields will require recovery periods and rotation of use to maintain ideal field conditions. The fields must also have effective drainage systems to move water off site. The City should note that intense play schedules require an increase in materials and equipment, irrigation repairs, staff labor, field aeration, and mowing.

Field Lighting
Lighting the fields creates the opportunity for extended play beyond the limitation of dusk. Lighting, however, also creates greater use resulting in increased maintenance and wear and tear of the grass areas. Though Packet Page 2618
97 Newark Citywide Parks Master Plan
the proposed grass fields do not include lighting, the City may consider lighting as funds allow.

Operating Cost Model
Table 12 identifies the likely costs for maintenance of the proposed grass turf fields. The cost model is without set-aside funding for replacement of the fields.

Table 12 – Operating Cost Model (assumes 1 acre, or 43,560 sf) Annual Maintenance
Mowing $1,800
Irrigation Repair $400
Sweep, Cleaning, and Trash $200
Annual Turf Repair and Striping $700
Over-seeding $1,500
Aeration $900
Top Dressing $2,000
Materials - Natural Turf $500
Water Use $13,000
Estimated Annual Maintenance Cost without
Set-Aside $21,000
The proposed grass fields comprise nearly 11 acres in size (482,600 sf), making their estimated annual maintenance cost range from $231,000 to $236,000.

Potential Revenue Analysis
The community demand for field use is high and cannot be met by the City’s existing supply of grass fields, with the current demand for field use highest among youth sports organizations. The scenario below is an example of the revenue that could be generated based on the assumptions listed.

General Operating Assumptions
The preliminary operating assumptions are summarized below. • Community use on weekdays and primetime use on weekends • Field availability is March through November with fields closed for the winter season from December through February, annually
• Operating Hours: Monday-Thursday 8am - Dusk
Friday-Saturday-Sunday 8am - Dusk
Fee Assumptions
• The rates are based on Newark community use
• The rates are based on community use during the weekday and primetime/tournament use on weekends
• Rates are based on single category/group classification. Fee adjustments for group categories will impact recovery rates Table 13 – Revenue Potential from User Fees of Grass Turf Fields Field Use Revenue
Per Day Field
Availability
Average
Hrs Per
Day
No. of
Days per
Year
% of Hrs
Used
Estimated
Total No.
of Hrs
Used
Rental
Fees/Hr
Totals
Weekday (MondayThursday)-Spring/
Summer
9 104 80% 749 $25/hr $18,725
Weekday (MondayThursday)-Fall7 51 60% 214 $25/hr $5,350 Weekend (FridaySunday)-Spring/
Summer
9 76.5 80% 551 $25/hr $13,775
Weekend (FridaySunday)-Fall7 38 60% 160 $25/hr $4,000
Revenue from User
Fees Per Year
$41,850
Packet Page 2619
98 Newark Citywide Parks Master Plan
Table 14 – Rental Rate Comparisons for Grass Turf Fields Field Use Rental Rates
City Type Resident Non-Resident
Newark Sportsfield Park & Birch Grove -
no lights.
$25-$45/hr $35-$50/hr
Fremont Grass Sports Field-no lights $10-$20/hr $40/hr
Union City Ball Fields and Open Grass Rates $5/hr-$20/hr $25/hr

GROUP PICNIC AREAS
Site
Bayshore Park (2)
Birch Grove Park (1)
Civic Center Park (1)
Dumbarton Neighborhood Park (1)
Jerry Raber Ash Street Park (1)
Newark Community Park (4)
Sportsfield Park (2)

Description
The City’s proposed group picnic areas will provide tables and benches and include barbeques and food preparation areas at several specific sites.

Dependent on the park site proposed, the picnic areas may be shaded or sited under a permanent structure. Depending on the City’s policy, the new group picnic areas will be reservable for guaranteed access or provided on a first come, first served basis.

Group picnic areas provide an ideal location for warm-weather gatherings.

Cities generally provide group picnic areas and barbeque facilities to encourage utilization of parks, social interaction, family cohesiveness, and promotion of outdoor leisure activities. These facilities are used to Packet Page 2620
99 Newark Citywide Parks Master Plan
host a variety of family and group events including reunions, birthday parties, team outings, company events, and informal social gatherings.

Typical amenities offered may include stations for washing and cleaning, barbeques, electricity, lighting, and signage. Convenient and accessible trash and recycle receptacles are additionally important to facilitate the cleanup process.

Cost Considerations
To minimize costs, the City should take in to account the importance of clear signage to deter unwanted uses and alleviate potential tensions regarding reserved times. Additionally, additional City staffing hours may be necessary to manage participant needs throughout the proposed sites.

Standards of Maintenance
To ensure the success and sustainability of the proposed picnic sites, the City should adopt a standard of maintenance for the picnic facilities.

Typical maintenance needs include:
• Refuse pick-up for offsite disposal
• Signage maintenance
• Cleaning of food preparation areas
• Maintenance and cleaning of seating areas
• Graffiti removal, as needed
• Blowing of debris and path clearing
• Barbeque cleaning
Operating Cost Model
The City of Newark does not currently reserve group picnic areas.

Should the City institute a reservation program, there are expense and revenue implications. Expense examples include the need for increased staffing when necessary, such as on weekends and holidays when picnic reservations are most frequent.

The proposed group picnic areas vary in size, type and quantity of site furnishings and amenities provided. The cost estimates listed in Table 15 identify new maintenance costs to the City and do not include current maintenance costs for existing park acreage and existing picnic areas. To estimate the probable maintenance expenses for the facilities the Newark Public Works Department projected unit costs, within accepted industry standards, which were applied to the various sites and their proposed amenities.

Table 15 – Annual Maintenance Cost
Picnic Amenities Quantity Maintenance
Cost Total
Shelter, picnic tables, pad w/ barbecue pit 8 $7,700 $61,600 Shelter, picnic tables, pad w/o barbecue pit 1 $6,700 $6,700 Picnic tables, pad, w/ barbecue pit 1 $6,000 $6,000
Picnic tables, pad w/o barbecue pit 2 $5,000 $10,000
Total 12 $84,300
Potential Revenue Analysis
To generate revenue to partially offset operating costs from the provision and reservation of group picnic areas, a fee schedule and reservation policy should be instituted with support and enforcement of the permit process. With reservations come expectations from the community that the City will support the program in order for it to be successful. The City’s role will be to process reservation requests, provide and update website descriptions, issue use permits, collect fees, and coordinate with the parks staff to provide enhanced cleanup and maintenance, and enforce site reservations. Reservations are generally viewed as a service and benefit to the community for which they must contribute toward the expense.

A comparative analysis of local group picnic reservations provides a benchmark for establishing fees, with fees varying up the sites’ capacity and location. The following information puts forth the reservation fees Packet Page
enforced by the cities of Fremont and Union City.
2621
100
Newark Citywide Parks Master Plan
The City of Fremont hosts 7 different parks with reservable space at picnic sites. Table 16 outlines the reservation fees enforced at Fremont’s Central Park based on several of the park’s reservable areas, as designated by the city.

Table 16 – Fremont Central Park Group Picnic Reservation Fees Fremont Central Park - Reservable
Area
Capacity
(Individuals)
Resident Fee Non-Resident
Fee
Mammoth 20 $50 $55
Dock 30 $75 $85
Brook 2 40 $100 $115
Triangle 1 50 $125 $145
Always Dream 1 60 $150 $175
Kennedy 70 $175 $205
Always Dream 2 80 $200 $235
Lions 2 90 $225 $265
Area B 100 $200 $235
Area A 350 $660 $930
Area C 350 $740 $1,040
*By reservable area
Union City hosts a variety of reservable picnic sites at 12 of its parks.

Table 17 outlines reservation fees enforced at a selection of Union City’s parks and their reservable picnic sites, as designated by the city.

Table 17 – Selection of Union City Picnic Reservation Fees by Park and Site
Park and Site Capacity
(Individuals)
Resident
Fee Non-Resident Fee
William Cann Civic- Egret 10 $35 $70
Shorty Garcia 20 $40 $80
Accinelli Park 30 $45 $90
Arroyo Park 40 $55 $110
Seven Hills Park- Kitayama 60 $80 $160
Kennedy Park- Camarillo Brown 70 $82.50 $165
Old Alvarado- Gazebo 75 $115 $230
Dry Creek 80 $95 $190
Contempo 100 $125 $250
Kennedy Park- Amphitheater 125 $150 $300
Kennedy Park- Daniel Camarillo 130 $165 $330
The fee schedules developed for the cities of Fremont and Union City consider site capacity, the number of people served, popularity of the designated site, and the associated amenities. Popularity of group picnic sites is based upon the park amenities, such as sports fields, and the scheduling of tournaments and game play.

Fee assumptions were developed to identify the potential revenue for the City of Newark. The Consultant developed assumptions that assume an average fee, system-wide, and that participant capacity will be 30 to 60 individuals per site. Changing any of the assumptions may have a significant impact on the estimated revenue. Table 18 reveals the proposed Newark park reservation fee structure.

Table 18 – Proposed Newark Park Reservation Fee Structure Sheltered or Unsheltered Picnic Site Capacity (Individuals) Resident Fee Non-Resident Fee
With Shelter 30 to 60 $65 $130
Without Shelter 30 to 60 $45 $90
Packet Page 2622
101
Newark Citywide Parks Master Plan
Based on the proposed fee structure, Table 19 represents projected revenue estimates regarding the 12 new group picnic site reservations, assuming demand is equal for all sites.

Table 19 – Projected Revenue Estimate
Revenue Assumptions -Summer Weekends - Saturday & Sunday Assumptions Site Rental Days Fees Collected Revenue
Potential
9 Shelter Group Picnic SitesProposed (Saturdays and Sundays) 234 Percent of Site Rentals (90%) 211
Rentals by Residents (80%) 168 $65 $11,000
Rentals by Non-Residents (20%) 42 $130 $5,500
Holidays and Special Events 90 $200 $18,000
3 Non-Shelter Group Sites-Proposed
(Saturdays and Sundays) 78
Percent of Site Rentals (90%) 70
Rentals by Residents (80%) 56 $45 $2500
Rentals by Non-Residents (20%) 14 $90 $1200
Revenue Potential $38,200
This conservative estimate may be doubled if the City grants half-day permits, allowing 2 rentals per site each weekend day. The provisions of electrical power or a process for renting a jump house are also examples of opportunities to generate additional income.

SKATE PARK
Site
Sportsfield Park
Description
The proposed Newark Skate Park is a fenced 18,000 sf, lit recreation facility with elevated and depressed skate features as well as seating and shade structures. Sited within a highly visible portion of the City’s Sportsfield Park, the skate park will be open during standard park hours, dawn to dusk, and will provide signage to articulate safety and facility regulations. The creation of a skate park in the City will provide a safe space for skate and skateboard recreation and serve as a valuable community asset and amenity.

Skate parks are athletic facilities, typically placed within larger public parks, with dedicated use by skateboarders and roller skaters. Skate features may include bowls, dips, snake-runs, street courses, skateable art, Packet Page
spines, ramps, banks, and other elevation-changing features. Areas within 2623
102
Newark Citywide Parks Master Plan
skate parks are typically designed to separate novice and advanced users and encourage the development of the sport’s tactical skills.

Cost Considerations
Graffiti prevention and abatement is an important cost consideration in the implementation of a skate park. Weekly, or more frequent, inspections of the site will aide in preventative maintenance of the facility. To prevent vandalism of the project, the City should consider using volunteers to survey and check the facility, seek cooperation with local law enforcement in the site’s surveillance, and ensure lighting and high visibility. Additional cost considerations include the need for adequate drainage, regular inspection and repair of the recreational features, and utilization of high quality materials and structures that will sustain use, weather and time.

Standard of Maintenance
For sustained use and success of the proposed skate park, the City should adapt maintenance standards to ensure the site’s care. Typical maintenance requirements for a public skate park include:
• Litter and debris pick-up
• Cleaning of seating areas
• Maintenance of shade structures
• Blowing and removal of debris
• Maintenance and replacement of concrete
• Graffiti removal
• Landscape maintenance, as necessary
• Pressure wash surface cleanings
Operating Cost Model
The aforementioned maintenance practices for skate parks results in typical maintenance costs ranging from $0.35 to $0.45 per square foot of facility. Applying this to the proposed Newark skate park, the annual maintenance cost may be expected to range from $6,000 to $8,000. An additional allocation of $2,000 should be included for maintenance of fencing, lighting and site furnishing, bringing the total estimated annual maintenance expense to range from $8,000 to $10,000.

Potential Revenue Analysis
Skate park admission is generally free-of-charge to the surrounding community. Skating programs, classes, skill camps, private rentals, competitions, and exhibitions may be a source of limited revenue, however, the provision of programming may reduce net revenue due to associated program costs to the City.

Revenue potential for the proposed project is estimated to range from $10,000 to $12,000, annually. The following is illustrative of the programming and assumptions made to achieve this projected potential revenue.
• Skate Park Rentals for Parties or Private Events: Revenue Potential $3,000
○ 1.5 hour rental
○ $125 rental rate
○ 4 rentals per month
○ 6 month spring-summer season
• Morning and Afternoon Skill Camp: Revenue Potential $7,200 ○ 6 half day week-long camps
○ $150 x 48 participants
○ 8 per camp
Additional sources of funding may include fundraising led by volunteers and user groups, naming rights, and vending contracts.

Packet Page 2624
103
Newark Citywide Parks Master Plan

SPLASH PADS
Sites
Birch Grove Park (481 sf)
Byington Park (1,252 sf)
Sportsfield Park (1,975 sf)
Description
The City of Newark proposes the creation of 2 new splash pads, at Birch Grove Park and Sportsfield Park, and the update of 1 existing splash pad, at Byington Park. These facilities will be comprised of rubberized matting, water spray heads, and various play structures for youth.

Splash pads are user-friendly, outdoor aquatic amenities that often serve as destination features for community members with toddlers, preschoolers, and depending upon the features, pre-teens. Popular splash pad features include vibrant colors and shapes and sequencing spray patterns that maintain the interest of young users. A healthy outdoor play amenity, splash pads offer unique water-based recreation for children and families.

Cost Considerations
There are 2 typical approaches to the creation of splash pad water systems. The first operates similar to a pool facility with chemicals, filters, and pumps (as well as UV and other sanitizing agents) stored in a tank below the play surface that re-circulate water through spray features. The second approach uses potable water from a city’s system, which flows through the splash pad once before it is sent to the municipal storm system or repurposed another way, such as irrigation. The option the City selects will have implications for the maintenance budget, staff resources, and the community’s commitment to water-wise conditions.

Standard of Maintenance
To ensure the success and sustainability of the proposed splash pads the City should adopt a standard of maintenance for the facilities. Typical maintenance needs necessary for community splash pads include:
• Refuse removal
• Signage maintenance
• Cleaning and maintenance of surfaces and features
• System check and repairs for valves, spray heads and filtration system • Removal of organic plant material
• Sanitization protocols
Operating Cost Model
Splash pads typically maintain low maintenance costs. Based on Consultant experience and standards, the aforementioned maintenance practices will be expected to cost between $2,000 and $4,000, annually, per splash pad. This projection does not include utilities.

Packet Page 2625
104
Newark Citywide Parks Master Plan
Revenue Potential
Despite the popularity of this feature, the revenue potential is limited.

The proposed splash pads are integrated into the City’s park system, are not fenced, and are provided as a site amenity. Private rentals for parties can be a source of limited revenue, however, this requires policies regarding closing the facility to the public, notification, and ensuring access to renters. If the City offered rentals of the splash pads during specified times, the revenue potential would range from $2,000 to $3,000, per site, or a total of $6,000 to $12,000 for the 3 sites. These figures assume a 2-hour rental at a cost of $100, with 2 to 3 rentals at each park per week for 10 weeks.

6.2 PRIORITY PROJECTS
The following park projects are identified as the top four actionable developments in the Citywide Parks Master Plan. Prior to the Master Plan, the City of Newark had identified new recreation projects that the community desired. The City’s 2013 General Plan called for the exploration of developing a skate and bike park, multi-purpose all-weather turf fields at Sportsfield Park, and a dog park for community use. Following an assessment of need, the Master Plan upholds and reinforces the creation of these new recreation facilities for the City.

BIRCH GROVE PARK DOG PARK ($503,783)
The top priority park project identified in the Citywide Parks Master Plan is the creation of a dog park at Birch Grove Park. Located in eastern Newark, Birch Grove is a 15 acre community park with a variety of existing amenities including lawn, pedestrian walkways, playgrounds, restroom, basketball, softball field, and tennis courts. In the updated plan of this park, the Master Plan envisions Birch Grove as having enhanced capacity to meet identified recreational needs in the community. A dog park here will serve as a unique, special-use facility and a much desired amenity for community members.

Figure 24 – Birch Grove Park Dog Park
Packet Page 2626
105
Newark Citywide Parks Master Plan
In the schematic design of Birch Grove, the nearly 1.3 (56,559 sf) acre proposed dog park will be situated at the north eastern corner of the site. The unlit dog park will contain separated areas for small and large dogs, shaded seating, and water for both canines and owners. Suggested surfacing at the site is decomposed granite - a safe, low-cost and lowmaintenance material approved for dog parks. Compared to other dog parks in the tri-city area the proposed Birch Grove dog park will compare favorably. Drigon Dog Park in Union City and Central Park Dog Park in Fremont, are 0.5 and 1.2 acres in size, respectively, and provide similar amenities to those proposed at Birch Grove.

Dog parks are valuable community assets that not only provide dogs with a safe space to exercise and socialize, but bring together community members, promote responsible dog ownership, and connect individuals with special interests. The creation of a dog park within Birch Grove will repurpose and activate valuable open space within the park to efficiently serve community demands in recreation. The proposed dog park at Birch Grove Park is aligned with the following overarching goals of the Master Plan:
protect
and
support

demands
in
service

community
identity

For a detailed break out of probable costs for the proposed dog park at Birch Grove, see Appendix E.

NEWARK COMMUNITY PARK DOG PARK ($315,648)
Second in priority park projects in the Citywide Parks Master Plan is the creation of a dog park at Newark Community Park. The City’s largest, and most active, community park is located in northern Newark, providing recreation amenities that include lawn, pedestrian walkways, playgrounds, picnic sites, basketball, tennis courts, and a restroom. In planning Community Park, the Master Plan envisions the park as open space with destination recreation features that will increase the site’s capacity to meet the City’s identified recreational needs. A dog park here will serve as a unique, special-use facility for the community, satisfying recreational need.

Figure 25 – Newark Community Park Dog Park
Packet Page 2627
106
Newark Citywide Parks Master Plan
The schematic design of this facility creates nearly one acre (38,700 sf) of dog park along the park’s northeast edge. As with the dog park proposed at Birch Grove, this unlit facility will include separated areas for small and large dogs, host shaded seating, provide water for canines and owners, and use decomposed granite for surfacing. Compared to dog parks in the tri-city area, this proposal will faire comparably. Drigon Dog Park in Union City and Central Park Dog Park in Fremont, are 0.5 and 1.2 acres in size, respectively, and provide similar amenities to those proposed at Birch Grove.

A highly desired recreation facility, the creation of a dog park within Newark Community Park will repurpose and activate valuable open space and further enhance the park as a multi-use recreation destination.

The proposed dogpark at Community Park is aligned with the following overarching goals of the Master Plan:
protect
and
support

demands
in
service

community
identity

For a detailed break out of probable costs for the proposed dog park at Newark Community Park, see Appendix E.

SPORTSFIELD PARK ALL-WEATHER TURF FIELDS ($4,400,214) AND UPDATED PEDESTRIAN PATHWAY ($390,478)
Sportsfield Park, adjacent to the City’s Silliman Activity and Family Aquatic Center, is Newark’s largest dedicated sport facility. Sportsfield Park is currently home to amenities including grass fields for recreation and competitive field sports, a youth baseball and softball field, a perimeter pedestrian path, and restroom.

Figure 26 – Sportsfield Park All-Weather Fields and Updated Path In the schematic update of Sportsfield Park, the Master Plan envisions Sportsfield Park as a destination sport and recreation facility. Community demand for sports fields is high with the City’s existing facilities unable to keep up with desired use. The third priority project identified in the Citywide Parks Master Plan is the creation of nearly 6 acres (260,000 sf) of lit, all-weather fields constructed from synthetic grass-like material, replacing grass turf currently utilized as sport fields. The proposed facility Packet Page
will provide 2 regulation soccer fields, and 1 baseball pitch (overlaid 2628
107
Newark Citywide Parks Master Plan
on the soccer fields), but will allow for the flexible layout of additional fields as needed. The development of all-weather turf fields will enhance Sportsfield Park as a place for destination recreation while generating major revenue potential as the facility will be available for community and tournament use.

Compared to similar facilities in the tri-city area, this development will compare favorably and assist in meeting regional demand for sport fields.

The City of Fremont has 2 synthetic turf soccer/multi-use fields located in Irvington Community Park and Karl Nordvik Park, at 1.6 and 2.3 acres respectively. Union City has 2 artificial turf fields at Accinelli Park and Shorty Garcia Park, at 2 acres and 5.6 acres respectively.

Along with the all-weather sport field development, the City will update 35,500 sf of pedestrian paving that surrounds the Sportsfield Park fields.

Used for active and passive recreation this walking loop is a critical pedestrian connector. The proposed all-weather sport fields at Sportsfield Park, and the update of the site’s existing walking loop, is aligned with the following overarching goals of the Master Plan:
protect
and
support

demands
in
service

community
identity

foster
connection
For a detailed break out of probable costs for the proposed all-weather turf facility and the adjacent pedestrian loop at Sportsfield Park, see Appendix E.

SPORTSFIELD PARK SKATE PARK ($1,140,450)
The fourth priority project identified in the Citywide Parks Master Plan is the development of a skate park at Sportsfield Park, at the northwest corner of the site. The proposed Newark Skate Park is a fenced 18,000 sf recreation facility with elevated and depressed skate feature, seating, and structures. Sited within a highly visible portion of the City’s Sportsfield Park, the skate park will be open during standard park hours, dawn to dusk, and will provide signage to articulate safety and facility regulations.

Figure 27 – Sportsfield Park Skate Park
Packet Page 2629
108
Newark Citywide Parks Master Plan
The creation of this special-use, community recreation facility is in line with the identity of Sportsfield Park as an activated, multi-use recreation facility. It will additionally repurpose currently unused space to efficiently service community demands. A space for safe, special-use recreation serving active youth, has long been desired in the City’s recreation planning.

The proposed facility will provide comparable amenities to those incorporated at the Union City Skate Park (21,000 sf) and Fremont Skate Park (30,000 sf).

The development of a skate park at Sportsfield Park is aligned with the following overarching goals of the Master Plan:
protect
and
support

demands
in
service

community
identity

For a detailed break out of probable costs for the proposed skate park, see Appendix E.. Additionally, please see Appendix F for the complete list of projects by priority, generated by City staff.

6.3 FINANCIAL ANALYSIS AND MANAGEMENT
Currently, park maintenance is primarily funded, 85%, by the City’s General Fund account. It is unlikely the City’s General Fund can support the additional cost of the proposed new park projects and their maintenance, requiring alternative funding sources. There is an opportunity to generate additional revenue to partially offset the new costs from the operations of several of the proposed facilities; and volunteers, or external organizations, may be engaged to help with fundraising. However, a reliable and consistent source of funding will likely be required. Strategies and options for capital funding and maintenance funding are presented in the capital project funding section.

OVERVIEW
The Parks and Landscape Maintenance Division of the Public Works Department currently maintains the City parks and fields and maintains cost data for existing facilities. An overview of the Recreation and Community Services Department budget and current funding for the Parks & Landscape Maintenance Division follows.

The Recreation and Community Services Enterprise Fund provides for the City’s recreation and community programs. The total budget for this fund in Fiscal Year (FY) 2015-2016 was $4.6 million, with budgeted revenue of $2.25 million in various recreation fees and charges. Revenues increased 9% from FY 2013-14, while total expenditures in the fund increased just 1% in the same period. The City General Fund contribution represents 48% of the Recreation and Community Services Department’s operating budget. General Fund support makes possible the delivery of an array of programs and services that impact the quality of life in the City of Newark, including:

Packet Page 2630
109
Newark Citywide Parks Master Plan
• General recreation services
• Youth and adult sports
• Fitness and wellness programming
• George M. Silliman Activity and Family Aquatic Center • General community and human services
• Youth and teen programming
• Senior activities
• Licensed child care programming

CAPITAL ASSETS MAINTENANCE ENTERPRISE FUND
The Parks and Landscape Maintenance Division of the City’s Public Works Department is responsible for the maintenance of all City parks and recreation facilities, in addition to street landscaping and residential cul-de-sacs. Maintenance of parks, sports fields, playgrounds and recreation facilities includes mowing turf, irrigation repair, hedging, litter removal, weed control, playground safety inspection and repair, and special event support.

The Public Works Department receives General Fund support for the operation of the Parks and Landscape Maintenance Division through the Capital Assets Maintenance Enterprise Fund. The budget of which was $1,532,700 and $1,742,700 in FY 2015-2016 and FY 2016-2017, respectively, and estimated to be $1,812,200 in FY 2017-2018. The General Fund provides 85% of the total funding for this account.

Although this funding has increased in recent years it remains below the FY 2005-2006 estimated funding level of $1,935,200.3
A significant challenge identified for the City is that proposed park amenities will increase the City’s maintenance costs. Without generating sufficient revenue to offset these costs, current maintenance funding is 3 Biennial Budget 2006-2008 Final
insufficient to absorb the new costs. Like most California communities, the City of Newark continues to experience increased demand for General Fund support with revenues unable to keep pace. In response to the fiscal realities the City’s practice has been to provide and maintain public facilities as resources allow, yet public input indicates a strong desire for overall improved park maintenance.

6.4 CAPITAL PROJECT FUNDING
The Newark Citywide Parks Master Plan identifies improvements to 15 parks in Newark, including two new parks planned as part of upcoming major development projects. The total cost for all these improvements is estimated at $35.5 million. This section identifies potential funding sources and strategies to assist the City in setting priorities for the various park projects.

CITY CAPITAL IMPROVEMENT PROGRAM (CIP)
In the budgeting process for the Fiscal Years (FY) 2016-2018 budget cycle, the City evaluated 121 projects of all types for potential funding, of which 39 are park and recreation facilities (not including the history museum or the cultural arts center). The total known costs for all of these projects is about $158.3 million (costs are not available for all projects).

The 39 identified park and recreation improvement projects in this budget cycle would cost about $11.5 million, including improvements to the Silliman Activity and Family Aquatic Center. About $1 million in recreation projects were programmed for FY 2016-17 and $145,000 for the current FY 2017-18. Nearly $7.8 million of parks and recreation projects in the current two year CIP are also included in the Master Plan.

Accounting for fiscal years 2016-2018 programmed expenditures for parks and recreation, there remains about $48.8 million in unfunded parks Packet Page 2631
and recreation capital projects.
110
Newark Citywide Parks Master Plan

FUNDING SOURCES
The City has some existing sources of funds to pay for capital projects.

The main source is Park Impact Fees charged to new residential development. The City also has a Public Art Fee program that may be appropriate to fund certain types of park improvements.

Park Impact Fees
The City requires new residential subdivisions to dedicate land, or pay an in-lieu fee, for parks and open space, as authorized by the Quimby Act (California Government Code Sec. 66477). In addition, the City charges a fee for the cost to develop parks and recreation facilities. The City updated its fee structure in 2016, although some development projects were entitled prior to this update and are subject to the prior set of fees.

The current rates are $25,000 per single family unit, or $7,500 per unit if the development dedicates a sufficient amount of land for parks along with the residential development. For multi-family housing, the fees are $5,300 per unit if land is dedicated or $18,000 per unit if no park land is included in the development. Developers also get dollar for dollar credits against their cost of onsite park development, which they often choose to do instead of paying the lower tier fee to the City.

By law, this fee revenue must be used for capital improvement costs and not operating and maintenance costs. When received, the fees are deposited in a separate Park Impact Fee fund. In the two fiscal years from 2014 to 2016, this fund received an estimated $1.96 million and is projected to receive an additional $1.5 million per year in FY 2017 and FY 2018.

The Newark General Plan projects that the City will develop an additional 6,200 housing units, and increase population by 16,580 persons, between 2012 and 2035. The City did not see much new development between 2012 and 2015 as the recovery from the 2008 recession was slower than anticipated. However, as indicated from the fee revenue described above, new development activity has accelerated. Table 20 provides an estimate of total potential fee revenue if the City meets its development projections by 2035, and accounting for known projects that will be constructing their own parks or are subject the lower fees before they were increased in 2016.

Table 20 – Projection of Park Impact Fee Revenue: 2016-2035 Single Family Multi-Family Total
Total Growth 2,030 4,120 6,150
Providing On site Park 1,560 3,100 4,660
Subject to Current Fees 470 1,020 1,490
Subject to Prior Fees 282 612 894
Projected from Prior Fees $2,103,720 $4,565,520 $6,669,240 Projected from Current Fees $4,700,000 $7,344,000 $12,044,000 Total Fee Revenue $6,803,720 $11,909,520 $18,713,240
*Totals may not add due to rounding.

As noted above, the park impact fees are higher if residential development does not dedicate park land as part of their development plans. However, several major developments do include park land, including the Dumbarton Transit Oriented Development (TOD) area, which would add 2,500 units, and the Southwest Newark Residential Area, which would add 1,260 units. Compared to the total projected unit development in the General Plan, these major developments represent nearly 60% of the growth projected by 2035 and other known development with onsite parks planned would add another 15 percent of this development capacity.

Based on the Newark General Plan growth projection and currently proposed projects, new development could generate $18.7 million in park impact fee revenue. This is in addition to the $634,132 received into the Park Impact Fee Fund in FY 2014-15 and any fund balance from fees received prior to 2014. Thus, it is likely that park impact fees would Packet Page 2632
111
Newark Citywide Parks Master Plan
fall short of the Master Plan non-developer funded park improvements, estimated at $28.3 million. In addition, the fee revenue will be collected incrementally over a long period of time, averaging about $900,000 per year. Fee revenue may need to be accumulated over several years to fully fund large projects and full implementation of the Master Plan may be delayed without other sources of funding. The following sections describe other potential funding sources that may augment park impact fees to fund the proposed Master Plan improvements.

GRANT FUNDING
Similar to most cities, Newark accesses state and federal grant programs when available to help fund parks and recreation facilities. For large projects it is frequently necessary to assemble several grants from sources which may have different purposes but which can contribute to portions of a larger project. In addition to state and federal grant sources, there are a number of private foundations, major corporations and nonprofit groups that offer funding for specific purposes appropriate to the types of projects proposed in the Master Plan. Appendix G provides a selected list of such grant programs that have offered funds in 2015 or 2016. In some cases these programs are offered on an annually recurring basis and sometimes they are one-time opportunities, or offered less frequently. If not already, the City may consider subscribing to a service such as Grantstation Insider (www.grantstation.com) in order to monitor upcoming grant opportunities. However, in general grant funds are limited and usually allocated on a competitive basis, which makes it difficult to incorporate them in specific ways into long term capital improvements programs.

Measure WW
Measure WW was approved by voters in Alameda and Contra Costa counties in November 2008. The measure extends Measure AA, approved in 1988, to help the East Bay Regional Park District meet the increasing demand to preserve open space for recreation and wildlife habitat. It makes funding available directly to cities and special park districts for high priority community park projects. Newark has been allocated about $2 million from this program, of which $1.7 million was approved for the Lakeshore Park Seawall project. The City has about $305,000 remaining in its allocation.

Community Development Block Grant (CDBG)
The City receives Community Development Block Grant (CDBG) funds, which may be used for a variety of purposes such as affordable housing, community facilities or economic development. The funded projects must benefit the target income group within the City.

State Department of Parks and Recreation
Periodically, voters of the state approve park, water and natural resources bonds that the State Department of Parks and Recreation uses to grant funds to local agencies through its Office of Grants and Local Assistance (OGALS). Most recently, a statewide park bond was passed in 2006.

Additionally, OGALS administers annual Land & Water Conservation Fund (LWCF) funds from the National Park Service, the Habitat Conservation Fund ($2 million/yr.) and the Recreational Trails Program (up to $4 million, depending on Congressional action).

Charitable Contributions and Donor Campaigns
Citizens and businesses alike often recognize the vital importance of the City’s parks and recreation system to the community quality of life and wish to contribute financially. For major projects, cities often mount donor campaigns, which may include major corporate support, to fund high profile facilities. However, this approach can also be helpful for neighborhood projects as well where the community may be willing to Packet Page 2633
112
Newark Citywide Parks Master Plan
conduct fund raising activities and donate volunteer efforts to provide a recreation, cultural, or open space amenity in their neighborhood.

The Newark Parks Foundation, formed in 2015, is a community group dedicated to mobilizing community support for Newark parks and recreation facilities and programs.

Additional Potential Funding Sources
The City may consider a variety of other financing mechanisms and funding sources to help close the gap on parks and recreation facilities costs and ongoing operations and maintenance. Some of these programs are most appropriate in relation to major new development projects and others are designed to increase funding from existing residents and property owners. This latter category usually requires voter approval, but may also include efforts to promote corporate sponsorships and community donations for specific community facilities as mentioned in the section above.

Bonds and Dedicated Local Taxes
With approval of the voters, the City can levy bonds or impose parcel assessments that would raise money for both parks-related capital improvements and operations and maintenance costs. For General Obligation Bonds, the debt service would be paid by a voter approved parcel levy. Another approach which may be appropriate for certain facilities, is a revenue bond, in which the debt service is paid by revenues generated by the facility that is funded. The City’s major revenuegenerating recreation facility is the Silliman Activity Center. Further analysis may determine whether the revenue stream from this facility could be leveraged to provide capital funding.

The City levies a number of local taxes that can be increased with approval of the voters, including the sales tax, utility users tax, and transient occupancy tax, among others. In 2015, voters in Newark approved continuation of the utility users tax and some cities have approved increases in the local sales and use tax to fund local services and facilities. Cities in California have used these types of local taxes to fund parks and recreation services, among other service costs. Taxes used for general purposes are subject to approval by a simple majority of voters while taxes levied for specific purposes require a two-thirds majority vote.

Land-Based Financing
In addition to general obligation or revenue bonds, cities also employ more limited land based financing programs such as Community Facilities Districts (Mello Roos CFDs), Landscape and Lighting Districts (LLDs), special assessment districts, and maintenance assessment districts. These types of financing districts can be established citywide, but more typically are employed for major subdivisions where infrastructure or service costs for the new neighborhood cannot otherwise be funded by developer or city sources. While impact fees can be used only to build new public facilities CFDs, LLDs and maintenance assessment districts can help fund operations and maintenance costs as well.

Community Benefits Program
In addition to impact fees, another potential approach to developer funding for recreation facilities would be to establish a community benefits program, in which development bonuses are offered in exchange for developer contributions to desired community facilities, which may include recreation related improvements. This approach would need to be coordinated with the City’s overall land use and development policies.

Typically, allowable community benefits are defined broadly and may include a range of improvements, from transportation to affordable housing, to specific community facilities. A key aspect of the program is that the City would need to be prepared to offer higher development intensities under certain circumstances than are otherwise allowed in the zoning in order to create a workable incentive that would induce developers to make the community benefits contributions. Such programs Packet Page 2634
113
Newark Citywide Parks Master Plan
are gaining wide acceptance in a number of the areas within the San Francisco Bay Area, but their success depends on a vibrant real estate market where development demand is sufficient to support the higher costs associated with the developer exactions.

Enhanced Infrastructure Financing District (EIFD)
The State legislature recently approved major modifications to a long standing local financing program called an infrastructure financing district. Under the new program, cities may allocate their own property tax increment within an established district to help finance a wide range of public facilities and improvements, including parks and recreation.

This is essentially a limited form of redevelopment tax increment financing, but only public agencies that agree to participate would allocate their tax increment to the EIFD. Establishing an EIFD, however, would mean that tax increment generated as new development occurs and property values rise would be diverted away from the City General Fund, so this mechanism would also need to be considered within the context of the City’s overall long term budget strategy.

Packet Page 2635
this page is intentionally blank
Packet Page 2636
APPENDIX 1 2 3
4567
Packet Page 2637
this page is intentionally blank
Packet Page 2638
Newark Citywide Parks Master Plan

DOCUMENT REVIEW
March 10th, 2017
Appendix A – DOCUMENT REVIEW
CHAPTER 7: APPENDIX
Packet Page 2639
Packet Page 2640

INTRODUCTION
The City of Newark engaged the services of RHAA, The Sports Management Group, and Applied Development Economics to prepare a citywide master plan to address the City’s long-term needs and meet its goals for the provision of parks, recreation and open space; the Newark Citywide Parks Master Plan.

The following document review summarizes planning documents that discuss existing infrastructure, currently proposed or pending improvements, and various practices and policies. Specifically, goals, policies, and programs from existing City plans and documents that relate to open space and recreational planning are reviewed to inform the policies of the City’s Citywide Parks Master Plan. This section additionally reviews documents related to current program offerings and citywide budget and revenue practices to further inform the policies of the Citywide Parks Master Plan and ensure that the Plan is consistent with planning, policies, and programs set forth by the City of Newark.

Packet Page 2641
Packet Page 2642
Master Plans & Studies ................................................................................................7 City of Newark General Plan .....................................................................................................................7 City of Newark Pedestrian & Bicycle Master Plan ......................................................................... 17 City of Newark Greater NewPark Masterplan................................................................................. 18 Dumbarton Transit Oriented Development Specific Plan .......................................................... 19 Southwest Newark Residential & Recreational Project ............................................................. 20 Recreation & Programming ......................................................................................21 Joint Use............................................................................................................................................................ 21 Recreational Services & Programming ................................................................................................ 21 Budget & Revenue .........................................................................................................23 Capital Improvement Plan......................................................................................................................... 23 Recreation & Community Services Budget ......................................................................................... 23

DOCUMENT REVIEW
Packet Page 2643
6 Packet Page 2644
7 MASTER PLANS & STUDIES
A. City of Newark General Plan
Document(s):

Newark California General Plan, 2013
The Newark California General Plan is intended to guide the City, looking 20 to 25 years ahead, through changes in technology, transportation, demographics, environment, and the economy; preserving Newark’s existing qualities while planning for its future. The General Plan, adopted December 2013, meets the requirements for general plans as stipulated by California State law including the seven mandatory elements: land use, circulation, housing, public safety, conservation, open space and noise. This General Plan also includes the optional elements of economic development, health and wellness, and community services and facilities.

The vision of the City’s future as defined by the General Plan process is to:
• Maintain a strong sense of shared community among residents and protect the quality of life.
• Guide the timing and location of development to protect sensitive natural environments.
• Concentrate commercial and industrial land uses along the edges of the city to capitalize on freeway access and buffer more sensitive land uses. • Focus future growth in key areas of opportunity for development and redevelopment while preserving the character of existing residential neighborhoods.
• Meet the regional need for housing, as defined in state legislation and the Bay Area’s Sustainable Community Strategy (SCS), and provide a wide range of housing opportunities for all housing types and income levels. • Provide new, higher density housing options that address the needs of senior citizens and cater to the preferences of younger generations, while maintaining the single-family residential neighborhoods that Newark residents value.
• Continue to provide adequate and varied recreational opportunities. • Foster the creation of new high-quality recreational open spaces and the enhancement of existing recreational facilities and open spaces. • Promote public health and safety.
• Develop a more sustainable and healthy community and promote walking and biking through focused transit-oriented development (TOD) and focused high-density housing in proximity to commercial uses. • Sustain NewPark Mall as a regional commercial attraction, while exploring opportunities for redevelopment of the surrounding area with civic and other uses supportive of the Mall.
• Redefine citywide transportation priorities to better balance the needs of all modes of travel.
• Facilitate cleanup of hazardous contamination sites in the City. • Embrace Newark’s bayfront location.

To formalize the future of Newark’s existing park system, the City’s General Plan calls for the creation of Newark’s Citywide Parks Master Plan. This Master Plan will result in the prioritization of funds for future park and recreation projects and the creation of a systematic foundation for the future of Newark’s parks. The following assessment of the Newark California General Plan identifies the goals, policies and actions, of each plan element, related to the City’s existing park system and the formation of Newark’s Citywide Parks Master Plan.

LAND USE
The Land Use element of the Newark California General Plan defines the City’s public policy on land use topics of growth and development, use compatibility, community standards, community design and identity, and historic preservation.

These policies set the direction of Newark’s future growth to maintain successful neighborhoods, improve civic identity, and enhance the City’s shopping areas and workplaces for coming years. These policies also provide parameters for future development of the City to enhance Newark’s quality of life.

Public open space, and its associated benefits, is identified as a valuable amenity in this element. Supporting various uses, providing civic identity and improving aesthetic appearance, park space is a valued land use protected in the City’s existing land use policy and proposed in Newark’s future planned development.

Packet Page 2645
8 The following goals, policies and actions relate to parks and recreation.

QUALITY OF LIFE
Goal LU-1: Maintain a desirable quality of life in Newark by preserving a small town, neighborhood-oriented atmosphere and sustaining a balanced mix of land uses.

Policy LU-1.1 Balance of Uses: Maintain a reasonable balance of land uses in the city so that residents can live close to where they work and satisfy their shopping, educational, personal, health, entertainment, and recreational needs close to home.

Policy LU-1.9 Park and Recreation Expansion: Expand park and recreational lands and facilities to keep pace with population growth and support the leisure time needs of Newark residents.

Policy LU-1.11 Centers: Create vibrant centers within Newark that provide focal points and gathering places for neighborhoods, and create identity and stronger sense of place for the city. Centers may include shopping areas, parks and public facilities, mixed-use districts, and other amenities that meet the diverse needs of Newark residents and visitors.

COMMUNITY STANDARDS
Goal LU-3: Protect the quality of Newark’s residential neighborhoods.

Policy LU-3.4 Property Renovation: Upgrade existing structures and sites, particularly those located along major thoroughfares, where deficiencies in appearance can create a negative image of the city and/or impact the value of property.

Action LU-3.B Blight Abetment: Continue programs to maintain community standards, including enforcement of illegal dumping regulations, graffiti removal, and other programs to abate blight.

Action LU-3.D Beautification Programs: As funding allows, undertake beautification and revitalization programs which improve the appearance of existing development through landscaping, streetscape improvements, and facade improvements.

COMMUNITY DESIGN AND IDENTITY
Goal LU-4: Enhance Newark’s identity as a city of high quality development that is distinctive from other cities in the Bar Area.

Policy LU-4.7 Lighting: Manage exterior lighting to reduce potential light and glare impacts, improve public safety, and enhance the character of the streetscape.

Policy LU-4.10 Civic Space: Develop spaces in the city which contribute to community building and social interaction. This should include parks, plazas, and other public areas, as well as gathering places within private development that are open to the public.

Action LU-4.C Lighting Improvements: Identify priority locations for lighting improvements along streets, in parks, and public places to address public concerns about safety.

DUMBARTON RAIL TRANSIT-ORIENTED DEVELOPMENT (D-TOD)
Goal LU-6: Develop a sustainable, transit-oriented development (TOD) comprised of residential, retail, office, parks, and open space uses around the site of the planned Dumbarton Rail station on Newark’s west side.

Policy LU-6.1 Dumbarton TOD Land Uses: Plan for the following activities around the intersection of Willow Street and the proposed Dumbarton Rail Service: (1) a future transit station serving the region as well as neighboring residents; (2) a neighborhood center consisting of retail, grocery, visitorserving, and higher-density residential uses; (3) up to 2,500 housing units with a wide range of unit types and affordability levels; (4) necessary infrastructure to support the development; (5) contribution toward an overpass on Central Avenue over the Union Pacific railroad tracks, and (6) a network of open space and parks, including a bayside trail.

Packet Page 2646
9 SOUTHWEST NEWARK RESIDENTIAL AND RECREATIONAL

PROJECT
Goal LU-7: Develop the Southwest Newark Residential and Recreational Project as one of the Silicon Valley’s premier new neighborhoods, with executive housing and high quality recreation.

Policy LU-7.6 Open Space Amenities: Include a major open space and recreational amenity within the Southwest Newark Residential and Recreational Project boundary. The preferred amenity is an 18-hole golf course with clubhouse. The former solid waste disposal site at the west end of Mowry Avenue should be considered for inclusion in the Golf Course site. In the event a golf course is deemed infeasible, then another recreational use that is acceptable to the city shall be provided through developer fees. In addition, development in this area shall provide for neighborhood parks consistent with the ratios established by the General Plan.

In the event a golf course is developed, its design should minimize disturbance of sensitive natural resources. To the extent feasible, the golf course should contain natural habitat such as native grassland and native trees rather than non-native grass and non-native vegetation.

Action LU-7.C New School and Park: Work with property owners and the Newark Unified School District (NUSD) in the planning of a new public school within this area. A neighborhood park should be designed on an adjacent site, with the two uses functionally integrated to facilitate joint use.

OLD TOWN NEWARK
Goal LU-8: Strengthen Old Town Newark as a vibrant, cohesive mixed-use district that honors Newark’s history while embracing its future.

Policy LU-8.6 Old Town Civic Space: Create civic gathering places, outdoor seating areas, fountains, and other public spaces in Old Town Newark which contribute to the area’s role as the historic center of the city, and make it a more attractive destination for Newark residents, workers, and visitors. Once constructed, such spaces should be programmed for civic events which draw people to the area and create more active street life.

Action LU-8.E Old Town Park/Plaza: Pursue development of a central park or plaza, with the potential to become a focal point for the Old Town area.

TRANSPORTATION
The Transportation element of Newark’s General Plan addresses topics and policies related to travel in and around the City, its accessibility to the larger Bay Area, and the modes by which transportation shapes the City’s identity. In regard to the City’s parks and recreation, this element’s call for enhanced recreational trails and potential open space development along existing transportation RightOf-Ways, supports Newark’s park system.

The following goal, policies and action relate to Newark’s Citywide Parks Master Plan.

PEDESTRIAN AND BICYCLE CIRCULATION
Goal T-2: Create a citywide pedestrian and bicycle network that provides safe access to destinations within the city, connects to an integrated regional network, and is accessible to users of all ages, abilities, and means.

Policy T-2.9 Recreational Trails: Develop and maintain trails in parks and open space areas, and between Newark neighborhoods and the City’s open spaces.

Policy T-2.12 Trails Along Railroads and Utilities: Consider the use of railroad, flood control, and utility rights of way for jogging, biking, and walking trails, provided that safety and operational issues can be fully addressed.

Such trails may be considered where the right-of-way is sufficiently wide to address safety considerations, and where a trail project would not interfere with railroad, flood control, or utility operations.

Action T-2.B Cedar Boulevard Pedestrian and Bicycle Trail: Convert the linear tract of land formerly reserved for a southerly extension of Cedar Boulevard between Haley St. and Willow St. into a bicycle and pedestrian Packet Page 2647
10 parkway, including a bicycle and pedestrian bridge over the Union Pacific Railroad. The City will apply for grants and pursue other funding sources to construct this project.

ECONOMIC DEVELOPMENT
The Economic Development element of the Newark California General Plan describes the goals, policies, and actions of the City that will encourage a strong economy, support existing businesses while attracting new businesses, and improve Newark’s overall quality-of-life and fiscal strength. Newark’s public open space is incorporated into the Economic Development element of the General Plan through its potential role in establishing a positive image of the City, enhancing the City’s competitive edge and identity within the Silicon Valley market.

The following goal, policies and action apply to the City of Newark’s parks and recreation.

PROMOTING NEWARK
Goal ED-5: Establish higher visibility and a positive public image of Newark.

Policy ED-5.5 Media Relations: Garner positive media coverage that promotes Newark as a livable city with great weather, a central location, quality shopping and dining choices, diverse housing choices, excellent schools and parks, and an accessible City government.

Policy ED-5.6 Bayfront Location: Promote the public image of Newark as a bayfront city, with amenities such as trails to the shoreline, open space, wildlife refuges, and bay vistas.

Action ED-5.E Community Special Events: Work with the Chamber of Commerce to promote local special events and festivals which draw visitors to Newark, such as the annual Newark Days, summer concerts in the grove, the NewPark Farmers Market, SummerFest, and other arts and crafts events.

CONSERVATION AND SUSTAINABILITY
Newark’s location directly on the San Francisco Bay compels the City to take an important stance on preserving its unique natural resources. Significantly, just under 50 percent of the City is designated non-urbanized land with a large portion of that dedicated to conservation. With this ratio, Newark has a unique opportunity to highlight its special relationship to the Bay and the valuable open space resources it hosts. The Conservation and Sustainability element of the General Plan outlines the City’s public policy on resource management and conservation.

The following goals, policies and actions relate to the role of Newark’s park system in environmental conservation and sustainability, particularly in environmental education, water conservation, urban forestry, and waste management.

ENVIRONMENTAL PROTECTION
Goal CS-1: Protect Newark’s natural environment, landscape and physical features.

Policy CS-1.5 Environmental Education: Support greater environmental education, awareness, and stewardship among Newark residents.

Action CS-1.C Environmental Curricula: Work with the Newark Unified School District and Ohlone College to promote environmental education and curricula for Newark youth. In addition, encourage Newark Recreation and Community Services Department and East Bay Regional Park District programs, which increase awareness of Newark’s natural environment.

WATER RESOURCES
Goal CS-3: Conserve and enhance Newark’s water resources.

Policy CS-3.2 Water Conservation Standards: Promote water conservation through development standards, building requirements, irrigation requirements, landscape design guidelines, and other applicable City policies and programs.

Packet Page 2648
11 Action CS-3.E Water Efficient Landscaping: Continue to implement the City’s Bay Friendly Landscaping Guidelines for water-efficient landscaping, including low water use plants and more efficient irrigation systems. Adopt more stringent outdoor water use policies for individual development proposals where feasible.

Action CS-3.F Retrofitting Water Infrastructure: As funding allows, retrofit water infrastructure and landscaping on municipal property to reduce potable water use.

URBAN FOREST
Goal CS-4: Conserve and manage the City’s tree resources and urban forest.

Policy CS-4.2 Trees and Public Improvements: Manage the City’s trees in a way that preserves the life of public improvements such as curbs, gutters, and sidewalks. Ensure that trees that are removed due to their age, health, or potential to damage property, are replaced in kind with new trees that are appropriate for their locations.

Policy CS-4.4 Street Trees as a Community Amenity: Encourage the use of street trees and landscaping to distinguish major thoroughfares and neighborhoods, beautify the city, encourage walking, and create a stronger sense of identity.

SOLID WASTE MANAGEMENT
Goal CS-8: Reduce landfilled waste through recycling, composting, and source reduction.

Policy CS-8.1 Recycling Program: Actively promote recycling, composting, and waste reduction in order to minimize the amount of waste requiring disposal in landfills. Provide for residential recycling and green waste containers and weekly curbside recycling pickup, to make it as easy and convenient as possible for residents to reduce the volume of trash requiring landfill disposal.

Action CS-8.E Recycling Receptacles in Public Spaces: As funding allows, provide recycling receptacles in parks and public spaces, in addition to trash receptacles.

PARKS, RECREATION, AND OPEN SPACE
The Parks, Recreation, and Open Space element of the Newark California General Plan sets forth the framework for which the City will manage open space for recreation, conservation, resource production, and public safety. The policies outlined here emphasize the importance of public open space in the community; providing valued opportunity for recreational, social, civic and aesthetic enjoyment. Additionally, this element provides strategy for adaptation of the City’s parks and recreation to meet the changing needs of the City’s residents.

The Parks, Recreation, and Open Space element is a guiding framework for Newark’s Citywide Parks Master Plan. The Citywide Parks Master Plan will work to support the policies, goals and actions outlined in this element to support Newark’s park and recreation goals.

PROTECTION OF OPEN SPACE
Goal PR-1: Protect Newark’s open space for a variety of purposes, including public recreation, the managed production of natural resources, protection of environmentally sensitive areas, aesthetics, and public safety.

Policy PR-1.1 Public Open Space: Protect and where possible enhance the public open space resources available within or near Newark.

Policy PR-1.3 Open Space and Community Character: Recognize the value of open space for shaping community character and identity and defining Newark’s image within the region.

Policy PR-1.5 Utility Easements: Encourage public utility agencies such as the San Francisco Water Department (Hetch Hetchy Aqueduct) and PG&E to retain their easements in open space or to improve them with linear parks or trails.

PARKLAND ACQUISITION AND EXPANSION
Goal PR-2: Expand and improve Newark’s parks and recreational facilities to meet existing and future needs.

Packet Page 2649
12 Policy PR-2.1 New Neighborhood Parks: Develop new neighborhood parks in locations where there is an existing or anticipated need.

Policy PR-2.2 Parks in New Development: Require new parks to be provided within large-scale new development. Where the provision of an on-site park is infeasible, require the payment of an in-lieu fee for parkland acquisition to serve that development.

Policy PR-2.3 Park Service Standards: Establish the following park standards to determine where and how much parkland should be provided in Newark, and to calculate the amount of in-lieu fees where appropriate:
(a) within the city, provide at least 3.0 acres of parkland per 1,000 population.

This total shall exclude wetlands and other areas that are not accessible for active or passive recreation,
(b) provide one neighborhood park per 5,000 population, with a park located within ½-mile of each residence, and
(c) provide one community park per 15,000 population, with a park located within 2 miles of each residence.

These standards may be adjusted to facilitate high value and unique facilities such as linear trails, dog runs, formal gardens, and indoor facilities.

Policy PR-2.4 Pocket Parks: Allow a portion of the parkland dedication requirement to be met through the provision of on-site pocket parks and play lots in new development.

Policy PR-2.5 New Facilities in Existing Parks: Where constraints to meeting the established park and recreation standards cannot be overcome, explore alternatives for providing additional recreational activities within existing park and recreation facilities.

Policy PR-2.6 Park Expansion: Explore opportunities to expand existing parks through the acquisition of vacant or underutilized land on the perimeter.

Policy PR-2.7 Distinctive Park Character: Ensure that every park and public space has its own unique character. Parks should vary in size and level of activity based on their location, natural setting, and use. Larger parks should include a mix of active and passive recreation areas to ensure that they serve a diverse range of users
Policy PR-2.8 Natural Features in Parks: Design new parks to respect and conserve important natural features. Wetlands and other environmentally sensitive areas located within park boundaries should be designated for protection and restored to the greatest extent possible.

Policy PR-2.9 Parks in Nearby Cities: When evaluating the need for recreational facilities, consider the availability of public facilities in nearby cities as a factor.

Action PR-2.A Park Impact Fees: Continue to implement provisions of the Quimby Act which enables the City to collect in-lieu fees for park acquisition.

Action PR-2.B New Park Locations: Develop new public parks in the neighborhoods planned for the western and southwestern edges of Newark.

Action PR-2.C New Park Facilities: Ensure that newly developing neighborhoods have access to a full array of recreational facilities. When determining what specific facilities should be provided in new parks, consider existing citywide deficiencies, so that all Newark residents may benefit.

Action PR-2.D Old Town Park: Consider opportunities for a new neighborhood park in the Old Town Newark area.

Action PR-2.E Donations of Money and Land: Create a mechanism through which individuals can donate money or land to the city for expansion of existing parks or the development of new parks or community facilities.

Action PR-2.F Community Input: Seek public input on improvements to City parks and recreation programs through user surveys, community workshops, and communication with organized recreation and neighborhood groups.

Packet Page 2650
13 PARK MANAGEMENT
Goal PR-3: Manage Newark’s parks in a way that enhances their natural qualities, conveys a positive image of the city and its neighborhoods, and fully meets the community’s recreational needs.

Policy PR-3.1 Facility Modernization: Periodically modernize or upgrade existing recreational facilities to ensure that they meet the needs of the community, respond to current trends, and make a positive contribution to Newark’s quality of life.

Policy PR-3.2 Quality Materials: Utilize quality materials in the construction of parks, public spaces, and recreational facilities. Park equipment and facilities should promote durability and resilience, be responsive to the Bay Area’s climate, and be resistant to vandalism to the greatest extent feasible.

Policy PR-3.3 Extending Facility Usefulness: Enhance the usefulness of existing athletic fields and active play areas by providing facilities and equipment that support a wider variety of sports and activities.

As funds allow, this could include improvements such as night lighting and the use of artificial turf to extend the hours of operation for playfields.

Policy PR-3.4 Park Safety: Ensure that parks are designed and managed to maximize the personal safety of users, maintain the visibility of play areas, and minimize the risk of injury.

Policy PR-3.5 Mitigating Off-Site Impacts: Manage parks to reduce and mitigate the potential for adverse effects on surrounding neighborhoods, such as evening light, noise, and parking.

Policy PR-3.6 Park Landscaping: Maintain high standards for park landscaping. Include a mix of native vegetation and ornamental landscaping to enhance visual quality.

Policy PR-3.7 Park Cleanliness: Keep Newark’s parks clean, well maintained, and free of litter, with an adequate number of trash receptacles and regular trash collection services.

Policy PR-3.8 Park Maintenance: Ensure the regular and systematic maintenance of park grounds and facilities. Maintenance methods should be sensitive to the environment, including pest management and weed control methods which minimize toxic chemical use.

This should also include facilities for composting and recycling, and sprinkler and irrigation equipment that is designed to reduce maintenance and repair requirements and minimize water waste.

Policy PR-3.9 Reducing Energy Consumption: Reduce energy consumption in parks and in recreational buildings through energy-efficient lighting, conservation and efficiency measures in park structures, and energy-conscious operating procedures in parks and recreational facilities. Wherever feasible, this should include the use of photovoltaic systems in new or rehabilitated recreation buildings.

Policy PR-3.10 Volunteerism: Encourage volunteer participation in the care and stewardship of parkland and the delivery of recreational services in Newark.

Policy PR-3.11 Responding to Changing Needs: Provide recreational facilities and programs which meet the diverse and changing needs of Newark residents, taking into consideration such factors as the aging of the population, the mobility needs of persons with disabilities, and the city’s growing cultural diversity.

Policy PR-3.12 Special Recreational Needs: Maintain recreation programs for special user groups such as disabled persons, seniors, and teenagers.

Recreation programs for youth are particularly important and should be a key consideration in the development of new facilities and programs.

Policy PR-3.13 Community Events: Hold communitywide events such as concerts and festivals in city parks. Such events should be carefully managed to ensure that parks are not over-programmed and that maintenance requirements are fully addressed.

Packet Page 2651
14 Policy PR-3.14 Financing Park Improvements: Consider the use of bond measures and similar financing programs for acquisition and improvement of park land and recreational facilities.

Action PR-3.A Parks Master Plan: Develop a Newark Parks Master Plan, which evaluates local park facilities against National Recreation and Park Association standards and determines the types and locations of improvements needed. A Parks Master Plan would also include use guidelines for the city’s parks, and a funding plan for future improvements.

Action PR-3.B Reclaimed Water Use: Continue to work toward the use of reclaimed or non-potable water for park irrigation, rather than using domestic water. As reclaimed or non- potable water infrastructure is developed, parks and public landscaping should be a top priority for new service.

Action PR-3.C Sustainability in Parks: Expand sustainability practices at Newark’s parks. This could include the use of bay friendly landscaping in City parks, and the expanded use of compost and mulch materials for fertilizer and landscaping.

Action PR-3.D Golf Course: Continue to pursue the development of a public golf course on the undeveloped residentially designated lands located in the southwestern part of the city. In the event a golf course is infeasible, consider development of another major public recreational feature or open space amenity in this area.

Action PR-3.E Skateboard and BMX Park: Identify potential locations, costs, and funding sources for a skateboard park and a recreational bicycle/ BMX park.

These are envisioned as two separate facilities. Sportsfield Park provides the best opportunity for a skateboard park. A location for a bicycle/BMX park would need to be determined through future study. Development of both of these facilities is contingent on funding.

Action PR-3.F Birch Grove Lighting: As funding allows, install night lighting at the Birch Grove Park tennis courts.

Action PR-3.G Sportsfield Park Multi-Use Field: Pursue development of lighted multi-purpose all weather turf field at Sportsfield Park.

Action PR-3.H Dog Park: Recognize the growing demand for dog play areas in the City, and pursue development of a designated dog park within the Dumbarton TOD area.

Action PR-3.I ADA Compliance: Make continued efforts to comply with all provisions of the Americans with Disabilities Act (ADA) in the design and renovation of recreational facilities.

NON-CITY RECREATION FACILITIES
Goal PR-4: Maximize the benefits of non-City operated recreational facilities for Newark residents.

Policy PR-4.1 School Facility Access: Continue working with the Newark Unified School District to develop and maintain athletic fields and recreational facilities such as pools, playgrounds, and tennis courts. Support broader public access to these facilities when school is not in session.

Policy PR-4.2 Surplus School Sites: In the event a school site is declared surplus in an area deficient in park land, work with the School District to retain a portion of the school’s existing open space, playground, or athletic field area as neighborhood parkland.

Policy PR-4.3 Ohlone College Partnerships: Explore potential partnerships with Ohlone College to develop recreational facilities or programs on the Newark campus which may be accessed by Newark residents.

Policy PR-4.4 Regional Parks: Support the continued acquisition and improvement of open space in southwest Alameda County by the East Bay Regional Park District to ensure that Newark residents have access to an array of natural open spaces, including hillside parks, wilderness areas, and shoreline trails.

Packet Page 2652
15 The City supports continued enhancement of Coyote Hills Regional Park, Ardenwood Farm Agricultural Preserve, and Quarry Lakes, and access improvements which make it easier to reach these parks on foot or by bicycle.

Policy PR-4.5 Residential Development Recreation Facilities: Encourage private residential developments to include private recreational facilities serving that development.

This could include community rooms, clubhouses, swimming pools, and other facilities intended for use by residents. Such facilities would supplement the contributions these developments are required to make to improve public parkland serving residents and the city at large.

Policy PR-4.7 Plazas and Pocket Parks: In parts of Newark planned for more urban land uses and pedestrian-oriented development, provide for small pocket parks, plazas, and courtyards where residents, workers, shoppers, and visitors can congregate.

Such spaces could include amenities such as outdoor seating and dining areas, water features, and landscaping. Pocket parks and plazas should be designed to allow for interaction among community members and should be considered for programming with activities such as farmer’s markets, lunchtime concerts, and mobile vending.

Policy PR-4.8 Temporary Uses: Allow for the temporary use of vacant developable land for recreational purposes such as community gardens, art installations, and other interim activities.

Policy PR-4.9 Commercial Recreation: Encourage the development of private commercial recreational facilities such as bowling alleys and health clubs which complement and enhance the facilities provided by the city.

Action PR-4.A Joint Use Agreements: Develop joint use agreements and other appropriate mechanisms to facilitate public access to school playgrounds and athletic fields, and reciprocal school access to City recreation areas.

The City will make a concerted effort to improve access to school recreational facilities in the coming years. Currently, use of school grounds for recreational uses requires a specific agreement is reached with the NUSD for access to that facility. Many facilities are off-limits or difficult to access, even during non-school hours. The City will work with NUSD in the coming years to enhance joint use, and provide greater recreational opportunities and open space access for all Newark residents.

Action PR-4.B Modernization of School Facilities: Support implementation of School District capital projects which modernize or improve recreation and athletic facilities.

Action PR-4.C Expanded Public Access: Work with the Newark Unified School District to determine the feasibility of expanded public access to recreational facilities on school property such as the High School swimming pool and the tennis courts at the High School and Junior High.

TRAILS
Goal PR-5: Improve Newark’s trail system, with a focus on access to the Newark shoreline, and access between the shoreline and Newark neighborhoods.

Action PR-5.D Cedar Boulevard Extension Linear Park: As funds allow, construct a linear park and trail on the Cedar Boulevard Extension. Crossing of the Union Pacific Railroad should be grade separated to minimize risk and noise.

HEALTH AND WELLNESS
The purpose of the General Plan’s Health and Wellness element is to promote and sustain the health of Newark’s community. Goals of this element include improving air quality, promoting physical fitness, ensuring access to healthy foods, expanding local health care facilities, protecting residents from environmental hazards, reducing crime, and enhancing a sense of civic engagement and well-being.

The following goals, policies and actions relate to the City’s park network and Newark’s Citywide Parks Master Plan.

Packet Page 2653
16 FITNESS THROUGH DESIGN
Goal HW-2: A community in which physical fitness is supported and encouraged.

Policy HW-2.4 Access to Active Recreation: Maintain and develop facilities for active recreation and physical fitness in Newark, such as recreation centers, exercise circuits, and athletic fields.

Policy HW-2.5 Access to Parks: Ensure that parks and recreation centers can be easily reached on foot or by bicycle.

FOOD ACCESS
Goal HW-3: Access to healthy, affordable food for all Newark residents.

Policy HW-3.4 Community Gardens: Encourage community gardens where appropriate.

Action HW-3.B New Community Garden: Identify potential sites for new community gardens, including parks and schools.

SOCIAL CAPITAL
Goal HW-6: A civic culture that promotes meaningful engagement in public affairs and that creates a sense of pride in Newark among all city residents and businesses.

Policy HW-6.3 Public Space: Support the use of existing public spaces and create new public spaces where residents can gather for outdoor events (concerts, art fairs, etc.) or to meet and congregate.

Action HW-6.B Temporary Uses of Unimproved Land: Allow the interim or temporary use of unimproved land such as parking lots or vacant sites for public events, such as community festivals and farmers markets, provided that potential effects on nearby properties and roadways can be mitigated.

SAFETY THROUGH DESIGN
Goal HW-7: Safe and secure neighborhoods and public spaces.

Policy HW-7.3 Sidewalk and Pedestrian Lighting: Improve lighting of sidewalks, pedestrian areas, parks, and public gathering places where safety is a concern.

Action HW-7.A Development Review for Safety: Incorporate Crime Prevention Through Environmental Design principles into project review procedures for new development and major renovation projects. These principles are aimed at improving the safety of building occupants by designing for natural surveillance (windows oriented to the street and entryways), access control (hedges and landscaping to direct movement), territorial reinforcement, graffiti resistance, vandal-proof exterior elements, and shared facilities that provide “eyes on the street” during extended hours of the day.

COMMUNITY SERVICES AND FACILITIES
Community services in Newark include law enforcement, fire protection, medical response, childcare and other administrative services provided by the City. Community facilities include buildings and infrastructure used to deliver community services such as schools, libraries and municipal buildings. The Community Services and Facilities element outlines Newark’s policies for continued, high standard, community service throughout the City.

The following goals and policies relate to the Citywide Parks Master Plan.

COMMUNITY SERVICES
Goal CSF-1: Maintain community services and civic facilities that are readily accessible and respond to the needs of all Newark residents.

Policy CSF-1.1 Planning for Public Facilities: Plan for adequate public facilities to meet Newark’s current and future needs, based on demographic forecasts, fiscal and budgetary conditions, and adopted standards for municipal facilities and services.

Packet Page 2654
17 Policy CSF-1.3 Responding to Changing Needs: Ensure that community services respond to the changing demographics of Newark residents and businesses.

Policy CSF-1.4 Preventive Maintenance: Utilize and promote preventive maintenance practices which enhance the useful life of public facilities.

Policy CSF-1.7 Arts and Culture: Recognize the value of arts and culture to Newark’s identity, economic development, and quality of life. The City supports the development of facilities for live performances, culture, and recreation.

Goal CSF-2: Provide excellent schools that deliver high-quality educational services to Newark students while serving as neighborhood centers and fostering civic pride.

Policy CSF-2.5 Joint Use of Parks and Schools: Locate public schools and neighborhood parks adjacent to each other, so that recreational facilities may serve student and non-student residents to the greatest extent possible. Joint use agreements can allow City parks to be available to schools during school hours and school facilities to be available to the public in non-school hours.

Goal CSF-3: Expand services for Newark residents with special needs, especially children and seniors.

Policy CSF-3.5 Youth Services: Create a safe, positive environment for youth in Newark by providing recreation programs and facilities oriented to teens and pre-teens, encouraging internship and mentorship programs, and soliciting youth involvement and input in civic affairs.

Policy CSF-3.7 Disabled Services: Provide services which meet the needs of Newark residents with disabilities. Ensure compliance with the Americans with Disabilities Act and ensure that reasonable accommodation is provided to recognize the special needs of disabled residents.

B. City of Newark Pedestrian & Bicycle Master Plan
Document(s)
City of Newark Pedestrian & Bicycle Master Plan, 2017
Newark’s first bike and pedestrian transportation plan, the City of Newark Pedestrian & Bicycle Master Plan, is a long-range planning document that serves as the outline for Newark’s future pedestrian and bicycle improvement projects.

The Plan identifies needs in the City’s existing pedestrian and cycling networks and presents potential upgrades and repairs to facilitate enhanced use of the network. The Plan’s proposed projects provide access to the Bay Area water front, local parks and trails, and regional open spaces for recreation. The vision proposed in this plan is to:

Make the City of Newark as walking and bicycling friendly as possible to encourage people of all ages, abilities, and means to walk and bike.

Newark will be a community that provides its residents, employees, and visitors with viable walking and biking facilities. These facilities will meet the community’s travel needs, to improve health and recreation opportunities, and to provide economic benefit to those traveling via cost savings and to local businesses through the creation of vibrant, walkable neighborhoods. The City will have a complete, well-integrated system of bicycle and pedestrian networks and support facilities that encourage walking and biking as active transportation modes.

The Plan’s 5 overarching goals are to:
• Create a connected bicycle and pedestrian network
• Increase the number of people walking and bicycling
• Improve safety for pedestrians and bicyclists
• Develop a comprehensive Safe Routes to School program and supporting infrastructure
• Establish citywide design guidelines for bicycle and pedestrian facilities In relation to Newark’s Citywide Parks Master Plan, the City of Newark Packet Page 2655
18 Pedestrian & Bicycle Master Plan delineates the importance of pedestrianscale connectivity to the City’s park and open space resources as an important component of network circulation.

In the creation of the proposed bikeway network the Plan identifies connections to parks and open spaces as a key element of the planning criteria, and suggests the completion of the Cedar Boulevard Extension Linear Park to aid in bike network connectivity. At this extension of Cedar Boulevard, the Plan suggests the creation of a Class I bicycle path for dedicated pedestrian and bicycle travel.

In the creation of the proposed pedestrian network, the City of Newark Pedestrian & Bicycle Master Plan further supports the importance of pedestrian-scale access and connectivity to parks and open spaces as a valuable transportation amenity. Valuable open space-related amenities here include the maintenance and extension of sidewalks, street furniture, and street trees and planting for shade and buffering. The proposed pedestrian network also recommends better connectivity between existing parks and schools, specifically between Mayhews Landing Park and Graham Elementary School, and Mirabeau Park and Snow Elementary School.

The Citywide Parks Master Plan will consider the priorities defined in the City of Newark Pedestrian & Bicycle Master Plan throughout the planning process to ensure enhanced connectivity between the City’s park and pedestrian circulation systems.

C. City of Newark Greater NewPark Masterplan
Document(s):

City of Newark Greater NewPark Masterplan, 2015
The City of Newark Greater NewPark Masterplan is a guiding document for the Greater NewPark Project, a major redevelopment site for the City of Newark.

Centered on renovations to the NewPark Mall, a regional-serving shopping center opened in 1980, the Greater NewPark Project consists of approximately 125 acres of property planned for major enhancements to increase the use and value of the currently underutilized site. Along with the Dumbarton TOD Specific Plan and the Southwest Newark Residential and Recreational Project, the Greater NewPark Project is one of three sites in the City envisioned for new residential, workplace, and open space development. The City of Newark Greater NewPark Masterplan document sets forth overall goals for the project as well as a series of development concepts to illustrate the site’s future opportunities. The following are goals defined in the Masterplan:
• Support the ongoing renovation and repositioning of NewPark Mall. • Maximize economic development and long term revenue throughout Greater NewPark.
• Attract revenue-generating commercial, lodging, and entertainment uses that complement existing and desired retail and entertainment anchors. • Permit office, residential, live-work, civic, and quasi-public uses only so far as they support the overall success of revenue-generating commercial uses.

Residential development should complement and support existing and future commercial development. Residential projects should be exclusively rental housing and be constructed at densities that support transit and contribute to an overall intensification of development throughout the Master Plan Area.

In relation to Newark’s Citywide Parks Master Plan the Masterplan proposes redevelopment concepts for Shirley Sisk Grove, a public open space parcel within the project boundary. Currently, Shirley Sisk Grove is an undeveloped park space used seasonally for public events such as concerts and festivals. The NewPark Masterplan envisions a repurposing of the Grove to better support the goals of the overall NewPark redevelopment. Repurposing the Grove, and adjacent underused land within the project’s scope, would aid the Greater NewPark’s vision in becoming a vibrant regional commercial center. According to the Masterplan, repurposing the Grove could generate revenue while increasing safety and the value of adjacent properties and additionally reduce areas of disinvestment that may detract from the Greater NewPark’s overall character.

To repurpose the site, the Masterplan proposes that the NewPark development:
• Explore a possible long-term lease structure that would allow development of hotel, office, entertainment and mixed-use land uses.

Packet Page 2656
19 • Consider public/private partnership opportunities to ensure that publicly accessible community amenities are part of any planned development until the Grove events are permanently programmed elsewhere within the Greater NewPark.
• Prioritize building frontage along NewPark Boulevard, the major road adjacent to the Grove.

The Citywide Parks Master Plan will consider the priorities placed on the Shirley Sisk Grove throughout the planning process to best assess future development at the site and its role in the City’s existing park system.

D. Dumbarton Transit Oriented Development Specific Plan Document(s):

Dumbarton TOD Specific Plan, 2010
The Dumbarton Transit Oriented Development (TOD) project consists of approximately 200 acres of industrial land on the west side of Newark. The project site is bordered by the Union Pacific Railroad track to the north, Willow Street and existing industrial and residential uses to the east, the Alameda County Flood Control (ACFC) Canal to the south and existing, on-going salt production facilities to the west. Formerly an active site for industrial use, much of the property has been vacant since the 1990’s. Recently, however, the railroad right-of-way on the northern edge of the project has been selected as the alignment for a potential new transit line to link southern Alameda County with the Peninsula. Plans for a future Dumbarton transit station at Willow Street create the opportunity to capitalize on this public investment through adjacent development with high-density, residential, retail, and office uses and enhanced pedestrian circulation. The site’s location is additionally ideal for Transit Oriented Development as it is in close proximity to major transportation routes for regional circulation, such as Highway 84, and its place in the greater East Bay and Silicon Valley region allows it to serve a larger area for transit ridership.

The 2010 Dumbarton TOD Specific Plan provides a guiding framework for this development project. As a comprehensive planning document, this Specific Plan’s objectives and goals will support and control the development of the Dumbarton TOD project.

Dictated by the planning principles of smart growth, sustainable community design, green building and sustainable landscaping, the Dumbarton Transit Oriented Development project aims to create a community where “housing, recreation, a neighborhood retail center and employment opportunities are integrated” and “the automobile can be replaced by walking and biking”. Plan elements are to include a Transit Center, Neighborhood Center, Commercial and Retail uses, and the necessary infrastructure and utilities needed to support the development. Along with the proposed 2,500 housing units the project will also incorporate an extensive park and recreational trail network providing 16.3 acres of parkland, allowing 2 acres of park per 1,000 people.

The Specific Plan designates three park areas: a neighborhood park, a linear park and/or trail that connects to the Bay Trail, and a park adjacent to the Transit Station. Within these parks, one will provide an outdoor amphitheater and restroom facilities while another will host a dog park. These parks are to include a variety of recreational amenities, such as picnic areas and tot lots, to best serve their intended program. According to the parks and open space goals of the Dumbarton TOD Specific Plan, the project parks and open space will:
• Enhance the natural qualities of the area
• Draw from the region’s climate and native plants
• Convey the identity of the community and neighborhoods • Create flexibility for community needs, and provide
• Landscaping safety and security
With regard to the Citywide Parks Master Plan, the proposal of this park, open space, and linked pedestrian connectivity provides collaboration opportunity.

The Citywide Parks Master Plan can inform the impending development so that resulting recreational design serves the current and future needs of the City.

Packet Page 2657
20 E. Southwest Newark Residential & Recreational Project Document(s):

Newark Specific Plan: Area 3 & 4 of the General Plan, 2009 In the Newark California General Plan, the City identifies several Focus Areas where major land use change is anticipated. The Southwest Newark Residential and Recreational Project, formerly identified as Area 3 and 4 of the General Plan, is an identified Focus Area for which a Specific Plan was created: the Newark Specific Plan: Area 3 & 4 of the General Plan. The Specific Plan defines parameters for the transition of this largely undeveloped area into a low-density residential development of up to 1,260 housing units, with a major recreational facility and the dedication of conservation open space on some of the low-lying land south of the railroad tracks.

The Southwest Newark Residential and Recreational Project is comprised of 636 acres in the area of Newark bordered by Mowry Avenue to the west, Stevenson Boulevard on the east, Cherry Street to the north, and Mowry Slough to the south. Bisecting the project is the Union Pacific Railroad. The area north of the Union Pacific railway, formerly identified as Area 3, originally hosted 298 acres but 221 acres of that were dedicated to land uses for Ohlone College, Sportsfield Park, and the Stevenson Point Technology business park. Only the remaining 77 acres, formerly designated Sub Area A of Area 3, will be developed in accordance with the Newark Specific Plan: Area 3 & 4 of the General Plan.

According to this Specific Plan, development here will include the creation of a 600-student elementary school, a new neighborhood park, as well as a pedestrian trail along the adjacent Flood Control Channel. This portion of the Southwest Newark Residential and Recreation Project is currently vacant and undeveloped.

The area south of the railroad, formerly identified as Area 4, hosts 559 acres of undeveloped land with a history of past and present agricultural land use. The Newark Specific Plan: Area 3 & 4 of the General Plan divides this portion into 4 areas, each with unique parameters for development. To the south, Sub Area B is envisioned to transition from agricultural land to single-family housing with a small “nature park”. North of Sub Area B, Sub Area C may transition to either single-family housing or a recreational space, or both. To the north, Sub Area D may be used as a golf course or similar recreational amenity. Sub Area E will be retained for open space conservation as it lays adjacent to valued wetland habitat to the east.

In relation to Newark’s Citywide Parks Master Plan, the Southwest Newark Residential and Recreational Project provides opportunity to expand the City’s public open space. With the Specific Plan’s proposed addition of neighborhood parks, connective trails, and the dedication of a major recreation facility such as a golf course or similar recreation, the Citywide Parks Master Plan can inform the impending development so that resulting recreational enhancement serves the current and future needs of the Newark community.

Packet Page 2658
21 RECREATION & PROGRAMMING
A. Joint Use
Document(s):

MacGregor Playfields Agreement
The City of Newark and the Newark Unified School District maintain a longterm joint use agreement for the MacGregor Playfields, located at MacGregor School. The land is owned by the School District and leased to the City under a 1987 arrangement. Under the terms of the agreement, the City constructed the playfields, parking lot, and structures, and performs ongoing maintenance. The School District pays for the maintenance of the non-playfield areas, backstops and goals. The School District pays water costs to a specified limit and the City pays costs in excess of that limit. The City is responsible for scheduling the playfields during non-school use time.

Joint use of school fields and amenities is a standard practice for many communities to address recreational need. The Citywide Parks Master Plan will consider the City’s current and future joint use opportunities to efficiently meet the community’s open space and recreation needs.

B. Recreational Services & Programming
Document(s):

General Plan: Parks, Recreation & Open Space Element
The City of Newark’s Recreation and Community Services Department provides an array of programs and activities to serve the recreational, educational, and fitness needs and interests of the community. The Department provides recreational programs which include traditional and non-traditional offerings.

A sampling of traditional programs offered by the City include gymnastics, soccer, aquatic camps, licensed preschool, karate, softball, lacrosse, and aerobics.

Non-traditionally, the City supports culturally diverse activities evident in the offering of programs such as Bombay Jam fitness workouts, Kundalini yoga, and mahjong. Programs are designed to be age-inclusive and serve infants, youth, adults, seniors, and all abilities.

Regarding recreational space, the Department manages the Community Center, Senior Center, and Silliman Activity and Family Aquatic Center. An important recreational node, the Silliman Center includes three indoor pools, activity rooms, gymnasium, an aerobic and dance studio, fitness center, teen center and childcare spaces. Three community parks and two special use parks provide the setting for recreation in a natural environment. Activities here include fishing and boating in 16 acres of water area and a grove for outdoor concerts. The Department also manages playfields, tennis courts, basketball courts, picnic sites, and trails throughout the City.

In addition to recreational program offerings, the City of Newark’s Recreation and Community Services Department also designs and promotes community events that serve to create a connected and enriched community environment.

The Department’s community events range from Mariachi Festivals, Friday Night Concerts On-the-Green, Family Day at the Park, and a Senior Health and Resource Faire. Below is a list of the City’s regular community events, inclusive of the event’s local community partners.
• Music at the Grove Summer Concert Series
• Family Day at the Park
• Youth Fishing Day
• Newark Days (Newark Days Inc.)
• Sunday Afternoon Concerts (Love Newark/Newark Arts Council) • Symphony Performances (Newark Symphonic Winds)
• Community Theater (Stage One Productions)
• Farmers Market (Local Farmers and NewPark Mall)
Community engagement activities include volunteer opportunities, leader in training programs, and group volunteering activities.

Supplementing program offerings, the City also partners with and acknowledges an extensive list of community organizations that provide services and programs to support community connection. These include:
• Afro-American Cultural & Historical Society
• Newark Chamber of Commerce
Packet Page 2659
22 • CYO Basketball
• CYO Track and Field
• Fremont/Newark Jaycees
• Fremont/Newark YMCA
• Kidango
• League of Volunteers
• Life Eldercare
• Alameda County Library Services
• Newark Girls Softball League
• Newark/Fremont Football League
• Newark American Little League
• Newark National Little League
• Newark Health Center
• Newark Optimist Club
• Newark Rotary Club
• Newark Soccer Club
• North Fremont National Junior Basketball
• Ohlone College – Newark Campus
• Salvation Army
• Second Chance
• South Fremont/Newark NJB Basketball
• Stage 1 Theater
• Viola Blythe Community Services Center
Newark’s Recreation and Community Services Department strives to support a connected community, with program offerings intended to be opportunities to interact, explore, and to enrich the lives of all community members. The Citywide Parks Master Plan supports, and complements, this important recreational priority.

Packet Page 2660
23 BUDGET & REVENUE
A. Capital Improvement Plan
Document(s):

Capital Improvement Plan 2014-2016
The City of Newark adopts a biennial budget and the current budget includes FY 2014-15 and FY 2015-16. The budget also includes some data on prior years which are referenced in the discussion in terms of cost and revenue trends.

In the budgeting process for the current budget cycle, the City evaluates 143 projects of all types for potential funding, of which 29 are park and recreation facilities (not including the history museum or the cultural arts center). The total known costs for all of the projects is approximately $128 million (costs are not available for all projects). The 29 identified park and recreation improvement projects cost about $26 million. Of these, nine projects are identified for funding from the Park Improvements Fund, at a cost of $7,255,000.

For FY 2014-15, the City’s adopted Capital Improvement Plan (CIP) includes $3,173,000 in projects of which $400,000 are for parks related projects. The largest of these is the replacement of an irrigation line at Community Park for $200,000. For FY 2015-16, the City has budgeted $245,000 for park improvements, the largest being the re-plastering of the pool at Silliman Aquatic Center. The total CIP for FY 2015-16 is slightly lower than the previous year at $2,988,600.

There remain $25.3 million in unfunded park and recreation improvement projects identified in the CIP. Significant among these are the following:
• All weather turf fields - $2.2 million
• Cedar Blvd. Extension Linear Park - $4.5 million
• Improvements at GM Silliman Rec Complex - $2.7 million • Jerry Raber Ash Street Park - $2.0 million
• Public Restrooms at City Neighborhood parks - $5.0 million • Senior Center Construction - $7.0 million
As part of the CIP revenue sources, the City anticipates receiving $400,000 in park development impact fees in FY 2014-15 and $650,000 in FY 2015-16.

These fees are collected from new residential development projects and may only be used to construct or purchase new facilities or land, not for operations or maintenance costs.

Regarding departmental operations, the City accounts for recreation revenues and expenditures through the Recreation and Community Services Enterprise Fund. The total budget for this fund in FY 2015-16 is $4.6 million, which supports 54.11 full-time equivalent (FTE) staff.

The revenue to support this operation includes $2.25 million in various recreation fees. This level of fee revenues represents a 9 percent increase in the two years since FY 2013-14, while total expenditures in the Recreation Fund have increase 1.1 percent during this period. The General Fund is currently budgeted to support 48 percent of the Recreation and Community Services Fund operations.

B. Recreation & Community Services Budget
Document(s):

Recreation & Community Services Budget FY14-16
The City of Newark’s Recreation and Community Services Department operates as an enterprise fund, generating fees to offset costs. In fiscal year 2014-2015, revenue generated by the Department totaled approximately $2.2 million and funded approximately 51 percent of the operating cost. The top four revenue sources were program user fees (12 percent), aquatics and concessions (16 percent), childcare (7 percent), and general recreation (5 percent). The funding source for 49 percent of the revenue was from the City’s General Fund account. The Department strives to provide programs at an affordable rate to its residents and administers a scholarship program to increase access to programs and activities. Overall, the Department’s cost recovery performance of 51 percent is significantly higher than the national average of 29 percent, as listed in the National Recreation and Parks Association 2016 Field Report, an annual report with a top line assessment of national comparisons in key operational, Packet Page
programming, parks, and facilities.
2661
24 The operating costs for FY 2014-15 were approximately $4.4 million with cost centers reported as the following: Silliman Activity and Family Aquatic Center (45 percent), general recreation (22 percent), youth/adult sports (12 percent) and senior activity (9 percent). As is the case with most recreation and community services departments, the cost of wages and benefits are the highest line item expense, followed by utilities and maintenance. In FY 2014-2015 there were

13.25 full-time equivalent (FTE) department staff and 40.86 FTE of seasonal/ temporary support staff.

Additionally, the Department is responsible for administering the Paratransit service and receives Measure B and Measure BB funds to support the service.

This program is not reflected in the totals above.

Packet Page 2662
Newark Citywide Parks Master Plan

PARK SYSTEM INVENTORY &

ASSESSMENT
July 22nd, 2017
Appendix B – PARK SYSTEM AND INVENTORY
Packet Page 2663
Packet Page 2664

INTRODUCTION
To create a strategic plan for the future of Newark’s park system a detailed inventory of the City’s existing park facilities was conducted. On a tour of Newark each City-owned, or programmed, park was visited with the assistance of City staff and members of the Consultant team. Parks were inventoried to assess how each asset currently serves the community and where they hold potential to expand and improve upon recreational opportunities.

According to the Newark California General Plan, the City’s park facilities are comprised of Neighborhood, Community, and Special Use parks which provide Newark’s community with recreational amenities unique to each.

A Neighborhood park ranges from 5-10 acres, serves immediate residents within a ½ mile radius, and hosts simple amenities such as lawn, walking loops and playgrounds. Community parks are typically 20, or more, acres, serving residents within a 2 mile radius, and have facilities that attract community members throughout the City such as sport courts, lit fields and open space for unstructured activity. The City’s Special Use parks provide the community with a unique function or facility, with service area and acreage dependent on the park’s function. Newark’s existing park system hosts 8 Neighborhood parks, 3 Community parks and 2 Special Use parks.

The following information was collected regarding each park:

Location: Intersection
Size: Park acreage
USe: Serving Neighborhood, Community, or Special Use
cUrrent condition: Description of current conditions
FaciLitieS and amenitieS: List of facilities and amenities present recreation Provided: City-supported recreation provided conStraintS: Features that compromise the site’s full potential oPPortUnitieS: Preliminary ideas regarding opportunities to expand or enhance the site’s recreation
The information collected in this inventory informs the Consultant’s evaluation of the City’s existing park system. This assessment aids in determining the level of recreational need currently being met while identifying those recreational wants that are lacking or not being served in the City of Newark.

Packet Page 2665
Packet Page 2666

ISSUES & OPPORTUNITIES
In this park system inventory and assessment several recurring issues and opportunities were identified that apply universally across the Newark park system.

ADA COMPLIANCE
Throughout the Newark park system compliance to standards of accessibility can be enhanced, especially in the City’s playground design. To improve accessibility, while decreasing maintenance requirements, the City should consider replacing engineered wood fibar (“tambark”) with resilient rubber matting surfaces. The short-term cost of rubber matting may be desirable compared to the long-term maintenance cost of wood fibar. In lieu of replacing existing fibar, the City should ensure that accessible ramps lead into each play area.

In playground accessibility, the City should also consider providing universal play equipment and transfer stations. Transfer stations allow users to access elevated play structures without use of a wheelchair or mobility tool. Additionally, play structures should encourage interactive play for children of all abilities; installing more universal play equipment, such as spinners and saucer swings, can aid in providing recreation options to a diversity of users.

To ensure recreational accessibility the City of Newark should pursue an overall ADA assessment of its existing park facilities.

MAINTENANCE
In the inventory of Newark’s parks, it was noted that overall park facility maintenance can be improved. As is common in public open space, graffiti, vandalism and litter are unwanted companions to many of the City’s open space assets. To enhance community pride and investment in the daily upkeep of shared green space, the City should prioritize park maintenance.

STRUCTURES & FACILITIES
Newark’s park system incorporates a variety of essential recreation elements such as playgrounds, picnic tables, and walking paths, and lighting. Though these elements support the existing parks, the City should consider their update as part of the Newark Citywide Parks Master Plan.

Newark’s playgrounds and play structures can attract a wider range of users through updated design and program. Thematic design, nature play, and the addition of interactive elements should be considered to create a varied and creative experience for young users.

Picnic and seating options also provide opportunity for improvement and diversity. The City should consider replacing or enhancing these structures to continue accommodating community members for current and future enjoyment. Focusing on variety in aesthetic character, while improving functionality through additional shade structures, is suggested.

The majority of Newark’s parks maintain asphalt walking paths that are frequently in use. As popular modes of pedestrian circulation, the City should consider replacing asphalt walkways, which need regular resurfacing, with concrete paths which require less long-term maintenance. Additionally, the City may consider providing more all-weather pathways along park perimeters to further support walking and jogging in the community. Improved, or added, lighting through park paths will also improve user experience.

ACTIVATION
Though Newark has a variety of open space assets, this inventory and assessment finds that the majority of the City’s parks are currently underused.

The City should consider activating use through programming considerations and supporting alternate use through creating dog parks or skate parks where there is opportunity to do so.

Packet Page 2667
Packet Page 2668
Birch Grove Park ..................................................................................................................9 Byington Park ..................................................................................................................... 11 Civic Center Park ................................................................................................................ 13 Community Center Park .................................................................................................. 15 Jerry Raber Ash Street Park ........................................................................................... 17 Lakeshore Park .................................................................................................................... 19 MacGregor Fields .............................................................................................................. 21 Mayhews Landing Park .................................................................................................... 23 Mirabeau Park ...................................................................................................................... 25 Musick Park .......................................................................................................................... 27 Shirley Sisk Grove .............................................................................................................. 29 Sportsfield Park ................................................................................................................. 31 Susan Johnson Bridgepointe Park ............................................................................. 33

NEWARK PARKS
Packet Page 2669
8 200 sc N
Packet Page 2670
9 BIRCH GROVE PARK
Location:
Size:
Use:
Current
Condition:
Facilitiesand
Amenities:
Recreation
Provided:
Constraints:
Opportunities:
Additional
Observations:
Birch Street at Robertson Avenue
15 acres
Community Park
Well-maintained park with light community use, that can benefit from structural/facility updates and increased maintenance Barbecue Pits, Basketball Court, Benches, Tennis Courts, Open Field/Lawn, Picnic Tables, Playground, Restroom, Softball Playing Field, Tot Lot, Walking Paths, Water Play (not in use) City tennis lessons; League softball play; Passive recreation and gathering
Parking can become limited
Potential dog park site; Potential bike skills park site; Structural updates to facilities (basketball court, playgrounds, picnic tables, water feature); Potential reservable group picnic facility site; Enhance turf fields for sport use; Remove walls surrounding picnic tables for safety and visibility; Provide shade for play/ group areas; Softball field lights to be replaced
Vandalism and graffiti are a maintenance challenge
Packet Page 2671
10 200 sc N
Packet Page 2672
11 BYINGTON PARK
Location:
Size:
Use:
Current
Condition:
Facilitiesand
Amenities:
Recreation
Provided:
Constraints:
Opportunities:
Additional
Observations:
Central Avenue at Byington Drive
3 acres
Neighborhood Park
Well-maintained, relatively new developer-constructed
neighborhood park with large grass area and picnic gathering sites
Barbecue Pits; Basketball Court; Benches; Open Field/Lawn; Picnic Tables; Playground; Walking Paths; Water Play (not in use)
Passive recreation
Proximity to neighboring homes
Enhance water play area or replace with alternative use; Update existing playground
Park could benefit from increased activation and community use Packet Page 2673
12 200 sc N
Packet Page 2674
13 CIVIC CENTER PARK
Location:
Size:
Use:
Current
Condition:
Facilitiesand
Amenities:
Recreation
Provided:
Constraints:
Opportunities:
Additional
Observations:
Civic Terrace Avenue at Newark Boulevard
5 acres
Neighborhood Park
Neighborhood park with community use for passive recreation Barbecue Pits; Basketball Court; Benches; Open Field/Lawn; Picnic Tables; Playground; Walking Paths
Passive recreation; Practice site for under-6 soccer
Active railway at Eastern edge of park
Structural updates to facilities (basketball court, playground); Formalize perimeter path; Provide shade structures for group/ play areas; Potential site for reservable picnic facility; Locate new restroom here if Newark Library is relocated; Enhance turf field for sport use
Graffiti can be an issue for maintenance; Periodically update tambark at playground
Packet Page 2675
14 200 sc N
Packet Page 2676
15 NEWARK COMMUNITY PARK
Cedar Boulevard at Chapman Drive
16 acres
Community Park
Well-maintained and well-used community park actively accessed by community for passive recreation and festival/community events
Barbecue Pits; Basketball/Wall Ball Court; Community Center (hosts Newark Chamber of Commerce, satellite Newark police office, event facility rental, licensed child care center for ages 3-5); Benches; Lit Tennis Courts; Open Field/Lawn; Picnic Tables; Playground; Restroom; Tot Lot; Walking Paths; Water Play (not in use)
Passive recreation; Newark Days (hosts up to 80,000 people over 4 days); Family Day at the Park
Proximity to residential homes
Structural updates to facilities (basketball court, playgrounds, picnic areas) ; Potential site for dog park; Water play/splash pad improvement or transition to alternate use; Potential site for reservable picinic facilities; Potential site for “destination” playgrounds; Update existing restroom
Additional space at northern tip, where former petting zoo was removed; Restroom maintenance is a challenge due to unwanted activity; Vandalism and graffiti can be an issue for maintenance Location:
Size:
Use:
Current
Condition:
Facilitiesand
Amenities:
Recreation
Provided:
Constraints:
Opportunities:
Additional
Observations:
Packet Page 2677
16 200 sc N
Packet Page 2678
17 JERRY RABER ASH STREET PARK
Enterprise Drive at Filbert Street
6 acres
Neighborhood Park
Well-used neighborhood park that is now largely used as a community park for passive recreation and picnics/social gathering
Barbecue Pits; Basketball Courts; Benches; Head Start Preschool Facility; Horseshoe Pit; Open Field/Lawn; Picnic Tables (shaded); Playground; Restroom; Softball Practice Fields; Tot Lot; Walking Paths; Viola Blythe Community Center; Volleyball Pit
Youth Soccer practice field; Softball/Little League practice field; Passive recreation
Proximity to Hetch Hetchy Right-Of-Way (jurisdiction of San Francisco Public Utilities Commission)
Structural updates to facilities (playgrounds, picnic shelters, volleyball pit) ; Potential site for reservable picnic facility; Potential site for community demonstration or decorative garden; Close proximity to Newark Senior Center use (bocce ball, gardens, etc.)
Though park is assigned as practice field for Softball/Little League and Youth Soccer, it is not usually used due to poor quality of fields; Park needs improved maintenance (trash management, graffiti and vandalism); Park has history of gang use and public safety challenges
Location:
Size:
Use:
Current
Condition:
Facilitiesand
Amenities:
Recreation
Provided:
Constraints:
Opportunities:
Additional
Observations:
Packet Page 2679
18 400 sc N
Packet Page 2680
19 LAKESHORE PARK
Lake Boulevard at Parkshore Drive
26 acres (10 acres turf, 16 acres water)
Neighborhood Park
Lake-side community park used for passive recreation related to walking and fishing
Benches; Fish-stocked water body; Lawn; Parcourse; Walking Paths
Fishing; Youth Fishing Day
Park was constructed as part of a residential neighborhood; Wildlife
Potential site for new playground or tot lot; Enhance and update parcourse; Update boathouse and restroom
Geese and wildlife present throughout site; Basic maintenance Location:
Size:
Use:
Current
Condition:
Facilitiesand
Amenities:
Recreation
Provided:
Constraints:
Opportunities:
Additional
Observations:
Packet Page 2681
20 200 sc N
Packet Page 2682
21 MACGREGOR FIELDS
Cedar Boulevard at Lake Boulevard
10 acres
Special Use Park
Large sports field shared between the City of Newark and the Newark Unified School District for sport league access and community events
(4)Baseball backstops; Open Field/Lawn; (4)Soccer Fields Youth Soccer; Youth Baseball; Newark Days (hosts up to 80,000 people over 4 days)
Proximity to neighboring homes during Newark Days/festival events
Enhance opportunity as a carnival space; All-weather fields Owned by Newark Unified School District but maintained and programmed by City through a lease agreement; Newark Days carnival creates challenge for grass maintenance
Location:
Size:
Use:
Current
Condition:
Facilitiesand
Amenities:
Recreation
Provided:
Constraints:
Opportunities:
Additional
Observations:
Packet Page 2683
22 200 sc N
Packet Page 2684
23 MAYHEWS LANDING PARK
Cherry Street at Montcalm Avenue
8 acres
Neighborhood Park
Large neighborhood park with opportunities for passive
recreation
Barbecue Pits; Basketball Court; Benches; Open Field/Lawn; Picnic Tables; Playground; Walking Paths
Passive recreation
NA
Structural updates to facilities (basketball court, playgrounds, picnic area); Potential for additional facilities such as volleyball (adjacent to picnic area)
During site visits, park was in use through passive recreation (people sitting on lawn, playing basketball, flying kites) Location:
Size:
Use:
Current
Condition:
Facilitiesand
Amenities:
Recreation
Provided:
Constraints:
Opportunities:
Additional
Observations:
Packet Page 2685
24 200 sc N
Packet Page 2686
25 MIRABEAU PARK
Haley Street at Mirabeau Drive
6 acres
Neighborhood Park
Lightly-used neighborhood park with play structure, large field and perimeter path
Benches; Open Field/Lawn; Playground; Tot Lot; Walking Paths Passive recreation
NA
Update existing playground and adjacent seating; Potential site for additional recreation facilities such as volleyball and halfcourt basketball Improved maintenance needed at park; During the site visit, several young teenagers were using the play structures
Location:
Size:
Use:
Current
Condition:
Facilitiesand
Amenities:
Recreation
Provided:
Constraints:
Opportunities:
Additional
Observations:
Packet Page 2687
26 200 sc N
Packet Page 2688
27 MUSICK PARK
Musick Avenue at Cedar Boulevard
1 acre
Neighborhood Park
Simple neighborhood pocket park
Benches; Open Field/Lawn; Playground; Walking Paths
Passive recreation
Park is very small
Update play structure and site amenities; Provide additional seating; Provide perimeter fence for safety
Minimal community use; Underused pocket park
Location:
Size:
Use:
Current
Condition:
Facilitiesand
Amenities:
Recreation
Provided:
Constraints:
Opportunities:
Additional
Observations:
Packet Page 2689
28 200 sc N
Packet Page 2690
29 SHIRLEY SISK GROVE
Cedar Boulevard at North Magazine
2 acres
Special Use Park
Unimproved open space with minimal maintenance and seasonal use; No facilities
Temporary stage for seasonal music performances, Wooded Lawn
Newark Mariachi Festival; Music at the Grove Summer Concert Series; Sunday Afternoon Concert Series
Heavily forested Eucalyptus trees block clear views to stage; Site purchased through State grant means limited opportunity to change site use
Create permanent outdoor performance space with stage,
utilities, and parking
No parking at site requires use of NewPark Mall parking ; Sightlines/visbility should be improved for safety; Located in a part of the City that is not pedestrian-friendly; Eucalyptus trees require pruning
Location:
Size:
Use:
Current
Condition:
Facilitiesand
Amenities:
Recreation
Provided:
Constraints:
Opportunities:
Additional
Observations:
Packet Page 2691
30 200 sc N
Packet Page 2692
31 SPORTSFIELD PARK
Mowry Boulevard at Cherry Street
20 acres
Community Park
Actively-used sports fields for organized and recreational play Open Field/Lawn; Restroom (not in use during week); Soccer Fields; Softball Playing Field; Walking Path
Youth Soccer; Youth Baseball/Softball
City has outgrown the site’s field capacity; Limited parking during peak periods
Potential location for skate park at North West corner; Restroom and concession stand; Group picnic areas; Potential location for artificial turf fields; Addition of playground and/ or splash pad; Expand existing parking lot; Update existing pedestrian pathway
Site is also popular for pick-up games during the day (local professionals, etc.); Restroom is only open during league/ practice times due to unwanted activity; Located next to Ohlone College
Location:
Size:
Use:
Current
Condition:
Facilitiesand
Amenities:
Recreation
Provided:
Constraints:
Opportunities:
Additional
Observations:
Packet Page 2693
32 200 sc N
Packet Page 2694
33 SUSAN JOHNSON BRIDGEPOINTE PARK
Spruce Street at Bridgepointe Drive
4 acres
Neighborhood Park
Well-maintained neighborhood park that is currently
underutilized by the community
Barbecue Pits, Benches, Open Field/Lawn, Picnic Tables, Playground, Walking Paths
Passive recreation
Proximity to flood channel on Eastern edge of park; Close to residential homes/neighborhood
Landscape maintenance can improve; Structural updates
to facilities (playground and picnic areas); Potential site for additional recreation facilities such as volleyball and half court basketball
Popular park for off-leash dog play, although not officially allowed
Location:
Size:
Use:
Current
Condition:
Facilitiesand
Amenities:
Recreation
Provided:
Constraints:
Opportunities:
Additional
Observations:
Packet Page 2695
this page is intentionally blank
Packet Page 2696
Newark Citywide Parks Master Plan

DEMOGRAPHIC AND

RECREATIONAL TRENDS
March 30th, 2017
Appendix C – DEMOGRAPHIC AND RECREATIONAL TRENDS
Packet Page 2697
Packet Page 2698

INTRODUCTION
Demographic analysis is an effective tool for identifying the characteristics of Newark’s population that impact the demand for services. Demographic characteristics can be predictive of how segments of the population are likely to use the City’s parks, programs, and facilities. Population interests vary based on differences in age, household composition, income, education, race/ ethnicity, and other demographic measures. Population changes and patterns can also be identified and compared to the State and County. Conclusions can be made about community preferences and needs based on these patterns. These conclusions impact the recommended steps and goals of Newark’s Citywide Parks Master Plan.

State, regional, and national social, economic, environmental, and recreational trends will impact the demand and the delivery of recreation services in the City of Cupertino. Trends analysis identifies changing social patterns that shape societal characteristics, preferences, and interests. As a forecasting tool, it can be used to predict potential demand for amenities and services for recreation, leisure, and park pursuits. Assessing demographic and recreation trends provides useful planning data to anticipate changing interests and needs and to create spaces and programs to serve those anticipated needs.

The following section assesses and discusses demographic and recreational trends identified in the City of Newark.

Packet Page 2699
Packet Page 2700
Demographic Analysis ..................................................................................................7 Recreational Trends .....................................................................................................11

DEMOGRAPHIC AND RECREATIONAL TRENDS
Packet Page 2701
6 Packet Page 2702
7 DEMOGRAPHIC ANALYSIS
Demographic analysis is an effective instrument for making conclusions about potential users and program demand, as interests in recreation and leisure pursuits vary based on age, family status, income, and other population characteristics. An examination of patterns in educational attainment and income, household composition, population growth, and age groupings within the residential area can be used to make conclusions about the likelihood of demand for programs and services and the ability to meet the demand.

This demographic profile includes 2010 Census, 2014 estimated, and 2020 projected demographic data. Demographic data is based on United States Census data and projections provided by Nielsen Site Reports, an industry leader in global information and demographic data. Supplemental data sources include the City of Newark Community Development Department and the Association of Bay Area Governments (ABAG).

POPULATION PROJECTIONS AND DENSITY
The City of Newark was incorporated in 1955 and is surrounded by the City of Fremont. The cities of Newark, Fremont, and Union City make up what is known as the “Tri-City” area. The City of Newark is located in Alameda County, which had a 2010 population of 1,510,271 with a projected increase of 8.5% from 2010 to 2015; slightly higher than the projected growth in Newark.

The City experienced a boom in growth during the 1960’s and 1970’s. From the 1980’s through 2000 the City continued to grow at a steady pace of 12.0% to 18.0%. However, from 2000 to 2010 growth nearly stopped with only a

0.2% change in population from 42,471 to 42,573. Between 2010 and 2015, the City’s population expanded from 42,573 to 45,396, a 6.6% increase in 5 years.

Though the City is expected to grow another 5.7% to 48,026, between 2015 and 2020, the high demand for housing and action taken by the City to support the development of housing is projected to significantly increase the City’s population over the next 2 decades, exceeding Nielsen and ABAG projections.

The City of Newark General Plan, adopted December 2013, supports a substantial increase in residential development. The approval of a development project with 1,800 residential units will increase the population by an estimated 5,760 residents, based on the average of 3.2 people per household. This development is one of multiple housing projects approved by the City Council and not included in the current Census or ABAG population projections. While ABAG projects a Newark population of 57,000 residents by the year 2040, the City’s General Plan projects a 46.0% increase in housing units, increasing the population to an estimated 60,000 residents by 2035.

Population Growth
Newark % County %
2000 Census 42,471 1,443,741
2010 Census 42,573 .2% 1,510,271 4.6%
2015 Estimate 45,396 6.6% 1,638,215 8.5%
2020 Projection 48,026 5.7% 1,669,400* 1.9%
U.S. Census; *2020 ABAG Projection
Newark is 13.9 square miles and in 2010 the density was 3,068 persons per square mile. This is higher than the County’s population density of 2,043 persons per square mile and is 13 times greater than the State of California’s population density of 232 per square mile. The City’s high population density requires thoughtful planning of the City’s natural resources and recreation attributes to serve the greatest number of residents.

AGE GROUPS
Analyzing the population by age group provides valuable information used to inform planning recommendations, as age groups have differing needs and interests. The City of Newark, according to the 2010 Census, has three significant age cohorts:

Age Groups
Age Group Newark %
Youth (0-14 years) 8,931 20.98%
Family Forming (21-44 years) 14,901 35.01%
Baby Boomers (52 + 70 years) 7,917 18.73%
Packet Page 2703
8 Pre-school children, ages 0 to 4 years, comprise 7.4% (3,142) of the total population. School-age youth from 5 to 14 years comprise 13.6% (5,789) of the population. Combined, children and youth (ages 0 to 14) comprise nearly 21.0% (8,931) of the population. This large group drives demand for pre-school, afterschool, summer camp, youth sport, and teen programs. There will be continued demand for programming that targets these young and teen age groups in support of working parents. Also, youth sport programs and teen focused programs such as lifestyle enrichment and music, as well as social opportunities, will be desired. The need for parks and recreation services and amenities will persist as this age group, along with family-forming segments of the population, will continue to rely on community recreation for their leisure services. Family forming adults, ages 21 to 44 years, comprise the largest segment at 35.0% (14,901) of the population, indicating a continued need for family, youth and preschool services, recreation amenities, and parks.

Population Projection
2010 2015 2020
Description Census % Estimate % Projection %
Population by
Age 42,573 45,396 48,026
Age 0 - 4 3,142 7.38% 3,230 7.12% 3,231 6.73%
Age 5 - 9 2,929 6.88% 3,191 7.03% 3,308 6.89%
Age 10 - 14 2,860 6.72% 2,983 6.57% 3,309 6.89%
Age 15 - 17 1,868 4.39% 1,737 3.83% 1,878 3.91%
Age 18 - 20 1,620 3.81% 1,629 3.59% 1,681 3.50%
Age 21 - 24 2,204 5.18% 2,280 5.02% 2,158 4.49%
Age 25 - 34 6,377 14.98% 6,546 14.42% 6,138 12.78%
Age 35 - 44 6,320 14.85% 6,744 14.86% 7,201 14.99%
Age 45 - 54 6,273 14.73% 6,351 13.99% 6,557 13.65%
Age 55 - 64 4,454 10.46% 5,261 11.59% 5,918 12.32%
Age 65 - 74 2,683 6.30% 3,249 7.16% 4,038 8.41%
Age 75 - 84 1,437 3.38% 1,682 3.71% 2,039 4.25%
Age 85 and over 406 0.95% 513 1.13% 570 1.19%
Median Age 35.5 36.6 38.2
The City’s median age estimate for 2015 was 36.6 years, which is older than the 2010 Census reported median age of 35.5 years. The retirement age cohort, age 65 and over, comprises 10.6% (4,526) of the population, which is only slightly more than the older adults (55 to 64 years) who represent a significant group at 10.5% of the population (4,454). The older adult age group is comprised of the Baby Boomer Generation, which is a cohort aging in place and creating a demand for increased services and programming to stay active and engaged. The population projection for 2020 indicates that older adults and retirement age cohorts will continue to increase in population as they remain in their Newark residences. The need for senior services, health and wellness, fitness, and support systems for an aging population will continue to be in demand.

RACE & ETHNICITY
According to the Association of Bay Area Governments, diversity is a major demographic trend shaping Bay Area communities. In their report Plan Bay Area: Strategy for a Sustainable Region, the Bay Area will become “substantially more racially and ethnically diverse” by 2040, with noticeable increases in both Asian and Latino, or Hispanic, populations. The two most rapidly growing racial, or ethnic, groups in Alameda County are Asians and Latinos.1 This trend is consistent with the City of Newark’s current demographic composition, which is diverse and has sizable Asian and Hispanic populations.

At the time of the 2010 census the population of Newark was diverse with

35.2% (14,994) Hispanic or Latino, 27.5% (11,726) White, 26.8% (11,404) Asian,

4.5% (1,908) Black or African-American, and 6% (2,541) for all others. By 2015 Census projections, the Latino demographic had grown to 36.8%, Asian had grown to 28.9% (13,112), and White had decreased to 23.6% (10,753) with all others representing approximately the same percentage of the total population.

The 2020 projections indicate a continuation of this trend. Hispanics and Latinos are projected to grow to 38.4% (18,426), Asian 31.2% (14,970), and White declining to 19.8% (9,514).
1 Association of Bay Area Governments & Metropolitan Transportation Commission. “Plan Bay Area: The Bay Area in 2040 (30)”. Electronic. http://files.mtc.ca.gov/pdf/Plan_Bay_ Packet Page
Area_FINAL/2-The_Bay_ Area_ In_2040.pdf
2704
9 The increase in the Asian population is largely due to recent immigration. 34.1% (15,101) of Newark residents are foreign born with 15.8% born in Asia. Asian immigrant families are more likely to live in multi-family housing in denser neighborhoods. They are also more likely to live in intergenerational housing. In addition, recent immigrants are more likely to be linguistically isolated.2 The Hispanic population in Alameda Count is mostly growing due to “natural increases,” i.e., births are exceeding deaths. According to demographic data, Hispanic families often have more children than families of other races, partially because the Hispanic population is younger. Both Asian and Hispanic families are more likely to live in multi-generational housing, though this trend diminishes as people have been in the United States for a longer period of time (e.g. second and third generation immigrants).3
According to the Bay Area Open Space Council, recreation patterns among Latinos show a strong emphasis on family and large social gathering. Latino park users tend to value outdoor leisure activity as a way of family bonding, and enjoy recreation activities in developed natural areas that feel safe. Additionally, United States born Latinos tend to match the recreational patterns of the general population more than those born out of the country.4
The Asian American population is generally heterogeneous, and use patterns cannot be generalized.5 Higher income and education, American citizenship, and greater linguistic acculturation have been found to correlate to greater outdoor recreational participation among Asian Americans. Recreation is often a way of preserving cultural heritage and traditions, especially for non-native born and 2 Meyers, Dowell and John Pitkins. “U.S. Housing Trends: Generational Changes and the Outlook to 2050.”Committee on the Relationships Among Development Patterns, Vehicle Miles Traveled, and Energy Consumption Transportation Research Board and the Division on Engineering and Physical Sciences. 2008.
3 Ibid.
4 Chavez, Deborah. “Latinos and Outdoor Recreation.” U.S. Department of Agriculture Forest Service, Riverside, CA. March 2012.
5 San Francisco Bay Conservation and Development Commission (2006). “Staff Report:

Recreation and San Francisco Bay (27-28)” Electronic. http://www.bcdc.ca.gov/pdf/ planning/bpa0206/bpa0206rpt.pdf
immigrant members of the community.6,7
Race and Ethnicity - 2010, 2015, 2020 Projections
Estimates 2010 % 2015 % 2020 %
Total Population 42,573 45,396 48,026
Hispanic or Latino 14,994 35.2% 16,709 36.8 % 18,426 38.4% White 11,726 27.5% 10,753 23.6% 9,514 19.8%
Asian 11,404 26.8% 13,112 28.9% 14,970 31.2%
Black or African American 1,908 4.5% 2,123 4.7% 2,283 4.8% Nat. Hawaiian and Other Pac.

Isl.
601 1.4% 625 1.4% 645 1.3%
Amer. Indian and Alaska
Native
95 0.2% 102 0.2% 103 0.2%
Two or More Races 1,744 4.1% 1,856 4.1% 1958 4.1%
Other 101 .02% 116 0.3% 127 0.3%
Totals 100% 100% 100%

HOUSEHOLD COMPOSITION
There were 12,972 households in the City of Newark at the time of the 2010 Census. Of these, 10,334 (79.7%) were family households. A family household includes a householder and one or more people living in the same household who are related to the householder by birth, marriage, or adoption. In 2010, the number of households with individuals under 18 years of age was 5,643 (43.5%). The number of family households reflects the general population; at one end of the spectrum are households with children and at the other end are households with individuals 65 years and over. The 65 years and older age group represents 2,754 (21.4%) of all households. Following the aging trend of the City, the median age of householders is growing as homeowners remain in place; in 2010 the median age was 49.6, in 2015 it was 50.7, and is projected to be 52 years in 2020.
6 California State Parks. “Park and Recreation Trends in California.” Sacramento, CA 2005. http://www. parks. ca.gov/pages/795/files/recreation_trends_081505.pdf 7 Winter, Patricia, Jeong, Woo, and Godbey, Geoffery. Journal of Park and Recreation Administration. “Outdoor Recreation Among Asian Americans: A Case Study of San Packet Page 2705
Francisco Bay Area Residents.” Vol 22: Number 3. Fall 2004. 10 Households
Households 2010 % 2014
Estimate %
Total Households 12,972 13,474
Family Households 10,334 79.7% 10,445 77.6%
The City has a moderate home ownership rate. According to 2010 Census, Newark had 8,942 owner occupied households and 4,030 (31.1%) are renter occupied. The ownership rate indicates community members desire stability in their residential choices and find affordable housing available within the City.

INCOME
The 2010 median household income for the City of Newark was $69,278. This is higher than the State of California at $60,400, and on par with the County at $69,384. However, the 2014 Census projections of median household income indicate a rise to $86,521 for the City, significantly higher than the County at $73,775.

Children from higher income families are more likely to participate in out-ofschool programs and activities including before and after-school programs, summer camps, extracurricular activities, sports leagues and recreation classes.8 This is a factor to consider when assessing program fees and outreach efforts.

5.6% of families in the City of Newark live below the poverty level. This compares favorably to the County with a higher rate of 9.3% and 11.8% for the State. There is a portion of the community that will continue to benefit from subsidized programming, in the form of reduced fees, scholarships, and other measures, in order to have access to parks and recreation and community department facilities and services.
8 Harvard Family Research Project. “Findings From HFRP’s Study of Predictors of Participation in Out-of-School Time Activities: Fact Sheet.” Harvard Graduate School of Education, Cambridge, MA. 2007. <http://hfrp.prg>

LENGTH OF RESIDENCY
According to 2015 estimates, the average residence of homeowners and condominium owners is 16 years. This indicates that residents are generally settled and plan to age in place. The community appears rooted and vested in their hometown and holds an appreciation for their surroundings and location.

This may be an indicator of their satisfaction with City and regional services, such as access to employment, transportation, and urban amenities including shopping, restaurants, and markets. In contrast, renters on average remain in Newark for one year. This may be an indicator of transition and the search for affordable housing and long-term employment.

TRAVEL TIME TO WORK
The 2014 estimated travel time to work for City of Newark commuters was 27 minutes. This is in line with Alameda County, where estimated travel time is

29.5 minutes for commuting. This suggests that the population is mobile and commutes for employment. Based on the density of the area, many may work in a neighboring city or Silicon Valley. Preferred mode of transportation to work continues to be cars with 75.0% (15,004) driving alone. This may indicate that transportation is an important factor for the City of Newark to consider in its streets planning for easy access and egress from freeways. Also, scheduling must consider the schedules of the commuter for programming and services that are desired before work and after work.

SUMMARY
The City of Newark recognizes residents have choices in their leisure pursuits and strives to develop and expand programs to address residents’ needs. The City seeks to contribute to the quality of life for City of Newark residents through the provision of quality facilities and engaging programs. The demand for programs, parks, and facilities catering to a wide spectrum of users will continue. Providing amenities and programs that accommodate and support a multi-generational, diverse, and active aging population will be critical in meeting community expectations.

Packet Page 2706
11 RECREATIONAL TRENDS
State and national social, economic, demographic, and environmental trends impact the demand and the delivery of recreation services. The analysis of trends is one of several forecasting tool used to project interest and the potential use of amenities and services for recreation, leisure, and outdoor pursuits.

Understanding trends also provides useful planning data to anticipate the interest and needs of Newark’s growing and changing population. The following section analyzes trends impacting the City of Newark in the delivery of parks and recreation services.

The trends are presented and assessed in the following categories of demographic, recreation, social, economic and regional trends.

DEMOGRAPHIC TRENDS
Baby Boomers
Active older adults (Baby Boomers) are a growing population segment that desire activities and programs that will assist them in maintaining a long and healthy lifestyle. Baby Boomers, those born between the years of 1946 to 1964, do not consider themselves “seniors.” As Baby Boomers approach what was formerly retirement age, most do not plan to retire like the generations before them. A recent study found that 7 in 10 Americans plan to work following retirement from their mainstay career. An additional 14.0% plan to continue their work as volunteers.1 In the City of Newark, the population of those 52 to 70 years of age is 18.7%, a significant percentage of the City’s population.

Within the age subsets of each category are people of varying abilities, interests and health and wellness needs.

Despite aging the desire of this demographic is to live independently and stay active and engaged, resulting in increased demand for recreation and wellness spaces, services, and a variety of programming. Those who are retiring have a new set of expectations; they wish to participate in meaningful volunteer 1 John J. Heldrich Center for Workforce Development, Rutgers, The State University of New Jersey Center for Survey Research and Analysis, and the University of Connecticut. (2005). Work Trends: Americans Attitudes About Work, Employers, and Government. Retrieved July 6, 2007 from www.heldrich.rutgers. edu/Resources/Publication/192/WT16%20Press%20Release.pdf experiences, have time for recreation and exercise, and pursue special interests.

According to the American Association of Retired Persons (AARP), 87.0% of this demographic want to take better care of their physical health, 72.0% plan to spend more time on their interests and hobbies, and 47.0%want to increase their work as volunteers. 2
Baby Boomers embrace physical fitness and are invested in personal health. 3 Park and recreation departments can facilitate boomers’ needs in physical health, interests and hobbies, resource accessibility, and volunteerism.

Program offerings should include wellness, fitness, and sports programs, as well as travel, special interest classes, and activities.

Sandwich Generation
Many of today’s Boomers are part of the “sandwich generation,” a term used to describe adults who are providing some kind of care for a parent while raising or supporting their own children. It is estimated that 20 million Americans are currently doing so, with that number expected to double within the next 10 years.4 With an aging population and a generation of young adults struggling to achieve financial independence, the burdens and responsibilities of middle-aged Americans are increasing. Nearly half (47.0%) of adults in their 40’s and 50’s have a parent aged 65 or older and are either raising a young child or financially supporting a grown child (age 18 or older). According to the Pew Research Center, Sandwich Generation adults in the United States are mostly middle-aged, with 71.0% between the ages of 40 and 59. Uniquely, Hispanics are more likely to be in this situation than those who are white or black. Approximately 31.0% of Hispanic adults have a parent aged 65 or older and a dependent child. This compares to 24.0% of white adults and 21.0% of black adults.5 The impact of the Sandwich Generation on recreation is seen in the increased 2 John J. Heldrich Center for Workforce Development, Rutgers, The State University of New Jersey Center for Survey Research and Analysis, and the University of Connecticut. (2005). Work Trends: Americans Attitudes About Work, Employers, and Government. Retrieved July 6, 2007 from www.heldrich.rutgers. edu/Resources/Publication/192/WT16%20Press%20Release.pdf 3 Springs, Stephen. “Designing Recreation Centers for Seniors.” Athletic Business Magazine. February 2015.
4 Parker, Kim and Eileen Patten. “The Sandwich Generation: Rising Financial Burdens for Middle-Aged Americans.” (1). Pew Research Center: Social and Demographic Trends. Pew Research Center, 30 Jan 2013. Web. 21 Jan 2014. <www.pewsocialtrends.org/files/2013/01/Sandwich_Generation_Report_FINAL_1-29. pdf>
Packet Page 2707
5 Ibid.
12 need for programs and facilities designed to serve children, adults, and older adults at a single location and often, simultaneously. The multi-generational needs of these extended families may be served through careful planning of facility amenities and programming.

Racial and Ethnic Diversity
According to the Association of Bay Area Governments, diversity is one of two major demographic trends shaping Bay Area communities.6 In their report Plan Bay Area: Strategy for a Sustainable Region, the Bay Area will become “substantially more racially and ethnically diverse” by 2040, with noticeable increases in both Asian (from 21.0% to 24.0%) and Latino/Hispanic populations (23.0% to

25.0%). This shift is consistent with the City of Newark’s current demographic composition, which is significantly diverse, with growing Asian and Hispanic/ Latino populations.

As recreation relates to race and ethnic diversity, recreation is often a way of preserving cultural heritage and traditions, especially for non-native born and immigrant members of the community.7 The City’s Recreation and Community Services Department has responded to a diversifying community by supporting programs and activities such as Bollywood Dance, Muy Thai and Tai Chi.

Additionally, the City acknowledges the growing demand for cricket, lacrosse and other field sports and recognizes the need for more multi-purpose fields that can serve a variety of these interests.

Millennials
Those born between 1982 and 2000 are referred to as the Millennial Generation (also known as Generation Y or Echo Boomers). Millennials are now between the ages of 16 and 34 years and number about 11 million in the State of California.8
This generation is the most educated generation of Americans, is 6 Association of Bay Area Governments & Metropolitan Transportation Commission. “Plan Bay Area:

The Bay Area in 2040 (30)”. Electronic. http://files.mtc.ca.gov/pdf/Plan_Bay_Area_FINAL/2-The_ Bay_Area_In_2040.pdf
7 California State Parks. “Park and Recreation Trends in California.” Sacramento, CA 2005. http://www. parks.ca.gov/pages/795/files/recreation_trends_081505.pdf 8 Nielsen Corporation SiteReports. Figure is based on 2014 estimates for the Town of Windsor, using age groups 15-20, 21-24, and 25-34. See Demographic Analysis for data. the most ethnically diverse generation in United States history, and possesses the most disposable income.9 Compared to other age brackets, Millennials are “less accustomed to unstructured play than previous generations and apprehensive of the outdoors,” preferring to spend time indoors and leaving their homes primarily to socialize with friends and family. Additionally, this generation places a “high value on teamwork and belonging,” and tends “to be more inclusive, optimistic and tech-savvy than their elders.”10
To serve this demographic, Newark’s Recreation and Community Services Department should consider the use of social media and web applications to connect as well as maintain relevant programs, with a less competitive emphasis, to increase the opportunities to connect with nature. Programming that targets this demographic should provide highly structured activities and programs with goals, opportunities to exercise and recreate in a social group setting, and integration with technology and social media. Incorporating WiFi and Hotspots in park and facility settings may also encourage Millennials to visit these locations and establish a connection with the outdoors.

RECREATION TRENDS
Childhood Obesity and Health
Childhood obesity, a pandemic to households across the United Sates, has gained significant awareness in recent years as a public health concern. In 2010, more than one third of children and adolescents were overweight or obese,11 and currently obesity affects 17.0% of all children and adolescents in the United States.12 The percentage of inactive 6 to 12 year olds involved in no physical activities over a 12-month period rose to 19.5% in 2012 from 16.0% in 2007, according to the Physical Activity Council.13
9 California State Parks, Recreation Opportunities publication, March 2010 10 Ibid.
11 Ogden CL, Carroll MD, Kit BK, Flegal KM. Prevalence of obesity and trends in body mass index among US children and adolescents, 1999-2010. Journal of the American Medical Association 2012;307(5):483-490. 12 Centers for Disease Control and Prevention, “Childhood Overweight and Obesity” <www.cdc.gov/ obesity/childhood/> Atlanta, GA. 5 Aug 2013. Web. 22 Jan 2014. 13 Physical Activity Council, “2013 Participation Report.” Retrieved March 10, 2014 from http://www.

Packet Page
physicalactivitycouncil.com/PDFs/2013_PAC_Overview_Report_Final.pdf 2708
13 In the City of Newark, nearly 40.0% of students were acknowledged as overweight or obese, according to a University of California Los Angeles study on the results of the 2010 California Physical Fitness Test (PFT). This state mandated test is required for all California 5th, 7th, and 9th graders and generates the Body Mass Index (BMI) information used to compute obesity and overweight figures.14
To address this negative trend, parks and recreation departments have the capacity to promote active lifestyles by providing physically active programs and sports for youth and teens. Studies indicate that children and adolescents are more likely to become physically active and fit if they have a wide range of accessible, safe, and affordable recreation opportunities. The City should continue to provide access to open space, outdoor recreation, opportunities to bicycle and walk, and affordable program fees. Additionally, the City should promote engagement with low-income families and the creation of fun, active recreational opportunities to aid in the development of the community’s health.

Self-Directed Recreation
Self-directed play and the development of recreation space that allows for unstructured activities is a significant recreational trend. Importantly, parks and open spaces provide environments that promote this spontaneous and/or selfdirected activity. According to California State Parks, Baby Boomers prefer parks as their location for outdoor activity. The nation’s most-popular fitness activity, walking for exercise, also supports the notion that self-directed outdoor play, and environments that are conducive to self-directed play, are a strong recreational preference. Recreation Management, a leading organization in recreation, sports, and fitness facilities, reported that nearly two-thirds of park department respondents ranked the following as the top five features in new park and recreation construction:
• Playgrounds
• Park structures, such as shelters, restroom buildings • Open spaces, including gardens, natural areas
• Outdoor sports courts, such as basketball, tennis
14 California Dept. of Education, Physical Fitness Testing Research Files (Dec. 2015). • Trails
This list reflects a growing trend towards unstructured play, access to green spaces, and outdoor fitness. Linking parks together with green corridors and trails is a feature of community design that encourages mobility, accessibility, socialization, fitness, and an appreciation of the natural environment. The ability to encourage spontaneous “play” environments is of increasing importance in park design.

SOCIAL TRENDS
Community Design & Social Recreation
Cities throughout the state and the nation are working to address issues of social alienation and physical inactivity through community design. As inactivity and social isolation increase, so do the incidence of obesity, heart disease, diabetes, depression, and mental illness.15Thriving public spaces promote the familiarity and social bonds that make communities and neighborhoods safer and healthier.

The trend for parks and recreation departments is toward making parks usable and vibrant social meeting places. A study titled Project for Public Spaces discusses the attributes that most social places share. The report explains that:
“a good place provides a range of things to do (‘uses and activities’); is easy to get to and connected to the surrounding community (‘access’); is safe, clean, attractive (‘comfort and image’); and, perhaps, most important, is a place to meet other people (‘sociability’).”16
In promoting social recreation, an important factor is the design and provision of environments for a range of age groups, physical abilities, and ethnic/cultural interests. Beyond making facilities and parks social gathering places, departments are also working to promote inclusiveness in the design of these spaces. A highlight of this is responding to the needs of extended families and members of the Sandwich Generation by making parks and facilities multigenerational 15 California State Parks, Recreation Opportunities publication, March 2010 16 Project for Public Spaces. (2006). Health and Community Design, Project for Public Places. Retrieved Packet Page 2709
July 18, 2007 from http://www. pps.org/info/placemakingtools/issuepapers/health_community 14 family destinations.

An application of broadened inclusivity in community design is seen in park play structure design. Parks and play equipment can be designed to allow use by community members with physical restrictions and special needs, as well as older adults. Playgrounds can feature equipment that is accessible, fun, and easy to use by those who require mobility assistance. Using firmer material alternatives to sand and wood chips and the utilization of ramps supports this. Outdoor fitness equipment, designed for adults and seniors of all ability levels, additionally combats obesity and inactivity. Park design can also combine active and passive uses and provide for a variety of leisure activities within close proximity of each other for a mix of recreation uses and users.

Sensitivity to Gender Neutrality
Municipal parks and recreation departments are charged with providing healthy and safe recreation programs and services to all community members. As issues of gender and transgender rights gain heightened national awareness, families, communities, and institutions nation-wide are adopting the practice of gender neutrality, defined as creating an environment in which distinguishing roles based on someone’s sex or gender is discouraged. In response, parks and recreation departments are reevaluating policies, facilities, and programs to encourage gender neutrality and not obstruct participation. In a national survey of 6,450 transgender and gender nonconforming individuals, slightly more than a quarter (26.0%) reported having been assaulted because of their gender identity, according to the National Recreation and Park Association.17 The same article outlines three categories to encourage equitable access to parks and recreation facilities and services: agency culture, policies, and facilities and programs.

Examples of these include:
• Creating a welcoming and inclusive work environment and culture. • Providing training to staff on the agency’s anti-discriminatory culture. • Implementing bullying and harassment training.
17 Oakleaf, Linda. “Social Equity in Parks for the Transgender Community.” Parks & Recreation Magazine. October 2015. http://www.parksandrecreation.org/2015/October/Social-Equityin-Parks-for-the-Transgender-Community/ • Creating policies to allow individuals full access to changing, shower and restroom areas that correspond to their gender identity. • Updating policies that might affect program and facility access. • Revising program descriptions and offerings to be gender neutral.

Technology and Social Media
Mobile device technology now plays an important role in citizens’ recreational lives and habits. Internet and mobile applications are frequently used as tools in activities and programming, with the internet becoming a key method of communicating information. Residents are turning to the web for information, which must be accurate and easy to access. Marketing materials such as a brochure can be used to direct users and participants online for information and enrollment in programs and activities. Quick navigation of the site, enticing graphics, and ease of online registration are all important elements to consider.

An email newsletter system is also an excellent marketing tool to promote new classes and communicate department news.

ECONOMIC TRENDS
Fiscal Accountability
Municipal parks and recreation agencies are required to be fiscally responsible while meeting the challenge of increased demand for services from a growing population. Parks and recreation departments must be financially sustainable, competitive in the marketplace, and incorporate sound business practices in their operational planning. The City of Newark has experienced these impacts as it grows and develops.

The City’s Recreation and Community Services Department continues to focus on meeting the challenges of fiscal responsibility through strategic planning of facilities, prioritizing and providing a variety of programming, and incorporating park spaces, which encourage simultaneous uses by all community members.

The City of Newark is looking to the future in its planning to incorporate Packet Page 2710
15 sustainability, encourage informal recreation uses, and increase facilities and programs in areas that encourage health and wellness. The Department is aware of the need for increased multi-use facilities and parks that can address the community diversity and cultural differences in leisure programming.

Sustainability is a key factor in the economic vitality of any plans. The Recreation and Community Services Department has a significant challenge in securing sustainable funding to provide the services and facilities needed for the population now and in the future.

Creative Funding Strategies
Agencies are exploring inventive new funding strategies to be sustainable in a tight fiscal environment. Some of these methods include:
• Creating special districts with dedicated funding
• Developing and operating revenue-producing facilities • Value-Capture property taxes related to park proximate values • Dedicated sales tax on recreation-related goods and equipment • Funding assessment districts with cost of living index (Landscape and Lighting districts)
The City of Newark is exploring options to provide facilities, parks, and amenities to meet the needs of a growing and diverse community. Requiring operational plans to determine funding strategies for sustainable programming is a primary step in the analysis of future capital projects.

REGIONAL TRENDS
RecReation ManageMent, a leading organization in recreation, sports, and fitness facilities, released their 2016 annual survey regarding facility planning, program popularity, and amenities according to regional distinctions in the United States.
the West Region, which incorporates the City of Newark, reports the following findings from recreation facilities.
• 87.5.0% of respondents partner with outside organizations. • More likely than those in other regions to partner with local schools (61.7%). • Most likely to report that they serve an all-ages audience (48.15%). • Adults and seniors were most likely to be the primary audience for respondents in the West. Some 21.9%of Western respondents said they primarily served adults, and 4.3% said seniors were their primary audience. • Respondents in the West were more likely than those in other regions to report that they had improved energy efficiency at their facilities (56%); or increased their fees (48.3%).
• Respondents from the West region were most likely to report that they had plans to build new facilities, or make additions or renovations to their existing facilities. Some 69.6% of Western respondents had plans for construction.

Respondents from the West are the most likely to be planning renovations (52.0%) to their existing facilities.
• Respondents from the West were more likely than their counterparts from other regions to include the following in their facilities: park restroom structures (50.2% include them); community centers (40.4%); skate parks (27.9%); childcare centers (24.1%); dog parks (22.8%); community gardens (20.8%); climbing walls (19.4%); golf courses (19.4%); and bike or BMX parks (9.2%).
• 42.2% of respondents from the West have plans to add more features at their facilities over the next few years. They were more likely than those in other regions to be planning to add: playgrounds; classrooms and meeting rooms; exercise studio rooms; natural turf sports fields; indoor courts; community centers; climbing walls; bike/BMX parks; and golf courses. • Respondents from the West were more likely than those from other regions to offer: mind-body balance programs such as yoga; swimming programs; adult sports teams; active older adult programming; aquatic exercise; teen programs; performing arts; festivals and concerts; day care and preschool; and special needs programs.
• 31.0% of respondents in the West said they plan to add programs at their facilities over the next few years. They are more likely than those in other regions to be planning to add day camps and summer camps.

These responses provide benchmarks and assist in shaping the trends and Packet Page 2711
16 direction of similar jurisdictions in the regional area. Programs in aquatics, active seniors, and exercise continue to be high priorities in this part of the nation.

Energy efficient buildings and efficient operations with an eye on cost recovery continue to be foremost in the minds of West Region providers. Almost

70.0% in the West will be exploring options to build new facilities, indicating a competitive construction market in the future.

Packet Page 2712
Newark Citywide Parks Master Plan

COMMUNITY WORKSHOPS,

NOTES, & SUMMARY
Appendix D – COMMUNITY WORKSHOPS, NOTES, AND SUMMARY
Packet Page 2713
Packet Page 2714

NEWARK CITYWIDE PARKS MASTER PLAN
Community Workshop 1 Summary
Positive Features of Newark’s Parks
• Size and quantity of Newark’s existing park system
• Location and connectivity of existing parks
• Lack of “destination recreation” within the City of Newark • Overall appearance and maintenance
• Walking paths
Additions Desired for Newark’s Parks
• Locally accessible skate park, with access/use for bicycles o Community members also identified various benefits of creating a skate park within the City, including:
 Free/affordable recreation
 Outlet for youth activity
• Dog park
o With park amenities to encourage social interaction
• Little League/Baseball Field
• Functional water features/water play within parks
• Additional indoor and outdoor soccer fields with:
o Synthetic turf
o Lighting
• Play structure and park amenities in/around Lakeshore Park • Drought tolerant planting
• Solar lighting
• “Doggie bag” stations
• Drinking fountains
• Non-smoking areas
• Disk golf
• Climbing walls
Improvements Suggested for Newark’s Parks
• Enhance existing soccer fields with:
o Shorter grass
o Better lighting
o Overall improved maintenance
o Soccer fields were also identified as important facilities that serve existing community members while attracting others to the City
• Better restroom maintenance at existing parks
• Improve access to parks through better pedestrian signage • Improve access to parks in consideration of youth transportation, safety and visibility • Improve existing park structures
o Playgrounds
Community Workshop 1 Summary Packet Page 2715

NEWARK CITYWIDE PARKS MASTER PLAN
o Site features (tables, benches, etc.)
• Better park maintenance
o Increase trash receptacles
o Encourage recycling
• Improve lighting
• Plant more trees
• Provide better shade for park structures and play areas • Improve accessibility for all users
o Inclusive play
Additional Comments and Suggestions for the Newark Citywide Parks Master Plan • There is currently a lack of recreational/physical activities for Newark’s youth and teens o Encourage unstructured, independence-building activities while encouraging youth access and mobility
• Consider the City’s ongoing urban development and its potential benefits • Newark’s ongoing growth should support the needs of the community, including:
o Existing residents and community members
o New residents and families
• Identify areas to expand the City’s park system
o Along Cedar Boulevard
• The City has outgrown current field use capacity at existing parks • Assess existing need and potential impacts of decision-making on the community o For example, research need for a City golf course
• Invest in and enhance the City’s existing parks
• Consider the benefits and potential revenue of “destination recreation” o Soccer field enhancement
• Consider “volunteerism” as an outlet to enhance City parks o Use community members and/or local businesses to achieve maintenance and improvement goals
• The City’s parks are currently underutilized
• Ensure that the Master Plan process is accessible to community members • Consider providing information to community groups regarding their independent growth/development Community Workshop 1 Summary Packet Page 2716
Community Workshop 1
Notes

NEWARK CITYWIDE PARKS MASTER PLAN
Board 1 Board 2
Board 3 Board 4
Packet Page 2717
Board 5 Board 6
Board 7 Board 8
Community Workshop 1
Notes

NEWARK CITYWIDE PARKS MASTER PLAN
Packet Page 2718
Board 9 Board 10
Board 11 Board 12
Community Workshop 1
Notes

NEWARK CITYWIDE PARKS MASTER PLAN
Packet Page 2719

NEWARK CITYWIDE PARKS MASTER PLAN
Community Workshop 2 Summary
Exercise 1: The study team identified sports and recreation facilities that are required to better serve the current and future needs of the community. As a group, review the list prepared by the team and tell us if we got it right, and if not, report the suggested changes by your group. • Group 1
o Bike Park/Pump Track
o Dog Park
o Improved Park Maintenance
o Golf Course?
• Group 2
o Improved Park Maintenance
o Drinking Fountains
o Horse Shoe
o Bocce Court
• Group 3
o Bike Park/Pump Track
o Multi-Use Fields (can host soccer, baseball, football, etc.) o Sand Volleyball
• Group 4
o Bike Facility
o Accessible Skate
o Sand Volleyball
• Group 5
o BMX Park
o Bocce Ball
o Multi-Use Artificial Turf Fields for tournaments
Exercise 2: As a group, prioritize the group’s top three projects, and then a second tier of the next four projects and a third tier of the remaining projects.

Project Priority
First Second Third
Dog Park 4
All-Inclusive Playground 3 3
Synthetic Turf Field(s) with Lights 3 2
Bike Skills Track (Pump Track) 2 2
Skate Park 1 3
Combined Bike Park/Skate Park 1
Group Picnic and BBQ Areas 2 1
Bocce Court 3
Water Features 2
Outdoor Performance/Festival Space 2
Park Renovations 1
Community Garden 1
Cricket Pitch 1
Golf Course
Pickleball Courts
Sand Volleyball
Community Workshop 2 Summary Packet Page 2720

NEWARK CITYWIDE PARKS MASTER PLAN
Exercise 3: Each participant will receive 10 “Newark Dollar Bills,” each equaling $100. Spend your “Newark Dollars” as you wish and allocate funds towards these specific projects you would like to see in the City.

Project Newark Dollars
Bike Skills Track (Pump Track) $13,100
Dog Park $11,200
3 Synthetic Turf Fields with Lights $10,700
All-Inclusive Playground $9,600
Skate Park $8,100
1 Synthetic Turf Field with Lights $4,800
Water Features $1,900
Group Picnic and BBQ Areas $1,300
2 Synthetic Turf Fields with Lights $1,200
Community Garden $1,000
Bocce Court $600
Ornamental Garden with Event Space $300
Festival Space with Permanent Stage $100
Golf Course $0
Pickleball Courts $0
Sand Volleyball $0
Cricket Pitch $0
Community Workshop 2 Summary Packet Page 2721

NEWARK CITYWIDE PARKS MASTER PLAN
Community Outreach Summary
To date, the Newark Citywide Parks Master Plan outreach process has completed two community workshops to collect input from the Newark community regarding desired recreation amenities and their prioritization within the City’s existing park and recreation network.

Community Workshop 1
The first community workshop was conducted by the Consultant and City staff on June 7th, 2016. This community workshop introduced community members to the goals and objectives of the Master Plan while serving as an initial event to collect community input on desired recreation amenities in the City of Newark. Event attendees were invited to share their observations on topics discussed at this workshop including: identified positive features of the City’s existing park system, additions desired to Newark’s park system, suggested improvements to the City’s parks, and any additional comments or concerns regarding the Newark Citywide Parks Master Plan. The following input represents a summary of community input collected at the first community workshop.

To initiate the discussion portion of the June 7th community workshop, attendees were invited to share features of the City’s existing park system that they identified as positive qualities. Many participants of the workshop noted an appreciation for the size and quantity of parks with the City’s recreation network as well as their locations and the general connectivity to and between the City’s existing parks. Other positive feature identified included a general appreciation of the parks’ appearance and maintenance and the presence of walking paths. Interestingly, one workshop attendee noted the lack of “destination recreation” within the City as a positive quality.

Following the first topic of discussion, workshop attendees were invited to share desired additions to the Newark park system. At this event, a majority of attendees identified the addition of a locally accessible skate park, with allowed bike use, as a desired feature. In this, participants noted that such an addition would supply free and/or affordable recreation while serving as a recreation outlet for the community’s youth. Following the creation of a skate park, many respondents also identified a dog park as a desirable amenity for the City of Newark. Additional popular desires included more little league and baseball fields, functional water features and water play within parks, and additional fields with synthetic turf and lighting. Notably, several attendees expressed a desire for play structures and park amenities at Newark’s Lakeshore Park. Additional requests included drought tolerant planting, adventure play features such as climbing walls, non-smoking designated areas within parks, “doggie bag” stations and sustainable solar lighting.

In identifying suggested improvements to Newark’s parks many attendees at the first community workshop noted a need to enhance the City’s existing soccer fields. In this, participants suggested that improving Newark’s soccer fields could include maintaining shorter grass lengths, improving lighting, and enhancing basic maintenance. Following soccer fields, many attendees also shared that restroom maintenance in the park system could be improved.

Additional suggestions from attendees included improved access to parks through better pedestrian signage, safe and improved accessibility to parks, updated park structures, better maintenance and trash collection, enhanced park lighting, more shade for park structures and play areas, and improved accessibility for all users.

Concluding the first community workshop, participants were invited to share any additional comments and suggestions regarding the Newark Citywide Parks Master Plan. An emerging theme from this workshop was the current lack of recreation and physical activities for the City’s youth and teens; many participants expressed a desire to encourage unstructured, independence-building activities while supporting youth access and mobility within the City.

Another emerging theme from the first community workshop was an acknowledgement of Newark’s place within a rapidly developing Bay Area. In this, participants noted that the Newark Citywide Parks Master Plan should consider Newark’s ongoing urban development, and its potential benefits, while prioritizing park and recreation amenities for its current and future community. This prioritization could include identifying areas to expand the City’s park system and investing in the enhancement and maintenance of Newark’s existing parks. A final theme to emerge from this Community Outreach Summary Packet Page 2722

NEWARK CITYWIDE PARKS MASTER PLAN
portion of the workshop was the importance of including the community’s input in the Master Plan process, to ensure that decision-making results remain relevant and beneficial to Newark’s community members.

Community Workshop 2
The second community workshop was conducted by the Consultant and City staff on August 4th, 2016. This community workshop relayed information regarding the Consultant’s gap analysis of the City’s recreation resources and amenities. This gap analysis was generated from an assessment of the City’s existing demographic trends, current trends in recreation management, a review of the City’s recreation use and supply of recreation amenities, and the Community’s input and expectations. Based on this assessment, the Consultant presented several recreation projects that could result from the Newark Citywide Parks Master Plan. These projects included a synthetic turf field(s) with lights, Pickleball court, cricket pitch, skate park, dog park, water features, all-inclusive playground, group picnic and BBQ area(s), festival space with a permanent stage, community garden(s), ornamental garden(s) with event space, and a golf course. Following this presentation, workshop attendees were invited to work through a series of exercises that would help identify and prioritize recreation projects and amenities for the City’s park and recreation system. The following is a summary of participant input at the second community workshop.

To initiate the exercises, workshop attendees were divided into 5 groups of 6-8 individuals. In the first exercise, the groups were asked to identify changes or additions to the list of potential projects reported. In response to this, the following list summarizes the additional recreation projects noted by workshop participants. • Bike skills track (pump track)
• Improved park maintenance
• More drinking fountains
• Bocce court(s)
• Sand Volleyball
In the next exercise, the 5 participant groups were asked to rank the identified recreation projects by first, second, and third priority.. The results of this exercise revealed the following as top-priority projects that should be considered in the Newark Citywide Parks Master Plan:
• Dog Park
• All-Inclusive Playground
• Synthetic Turf Field(s) with Lights
• Bike Skills Track (Pump Track)
• Skate Park
The table below notes, in detail, the number of groups that ranked each project as a first, second, and third priority.

Project Priority
First Second Third
Dog Park 4
All-Inclusive Playground 3 3
Synthetic Turf Field(s) with Lights 3 2
Bike Skills Track (Pump Track) 2 2
Skate Park 1 3
Combined Bike Park/Skate Park 1
Group Picnic and BBQ Areas 2 1
Bocce Court 3
Water Features 2
Community Outreach Summary Packet Page 2723

NEWARK CITYWIDE PARKS MASTER PLAN
Outdoor Performance/Festival Space 2
Park Renovations 1
Community Garden 1
Cricket Pitch 1
Golf Course
Pickleball Courts
Sand Volleyball
In the final portion of the second community workshop, attendees were invited to participate in an exercise to select the recreation projects they individually prioritized. In this exercise, each attendee was given 10 “Newark Dollar Bills,” each equaling $100. With their $1,000 in “Newark Dollars,” participants were instructed to allocate funds as they wished, putting their “money” towards the specific projects they desired to see developed in the City. Images of the following projects were posted with accompanying bags for participants to deposits their funds. • Bike Skills Track (Pump Track)
• 1 Synthetic Turf Field with Lights
• 2 Synthetic Turf Fields with Lights
• 3 Synthetic Turf Fields with Lights
• All-Inclusive Playground
• Bocce Court
• Community Garden
• Cricket Pitch
• Dog Park
• Festival Space with Permanent Stage
• Golf Course
• Group Picnic and BBQ Areas
• Ornamental Garden with Event Space
• Pickleball Courts
• Sand Volleyball
• Skate Park
• Water Features
Echoing the previous exercise, results from the final activity found that workshop participants prioritized the following recreation projects.
• Dog Park
• All-Inclusive Playground
• Synthetic Turf Field(s) with Lights
• Bike Skills Track (Pump Track)
• Skate Park
The table below notes, in detail, the final allocation of “Newark Dollars” per proposed recreation project at the second community workshop.

Project Newark Dollars
Bike Skills Track (Pump Track) $13,100
Dog Park $11,200
3 Synthetic Turf Fields with Lights $10,700
All-Inclusive Playground $9,600
Community Outreach Summary Packet Page 2724

NEWARK CITYWIDE PARKS MASTER PLAN
Skate Park $8,100
1 Synthetic Turf Field with Lights $4,800
Water Features $1,900
Group Picnic and BBQ Areas $1,300
2 Synthetic Turf Fields with Lights $1,200
Community Garden $1,000
Bocce Court $600
Ornamental Garden with Event Space $300
Festival Space with Permanent Stage $100
Golf Course $0
Pickleball Courts $0
Sand Volleyball $0
Cricket Pitch $0
Community Outreach Summary Packet Page 2725

NEWARK CITYWIDE PARKS MASTER PLAN
Community Workshop 3 Summary
Community Workshop 3 Summary
Community Workshop 3 was held over two days, November 9th and November 12th, to ensure the participation of as many community members as possible. At both dates the format and content presented was the same.

Below is a summary of input received, regarding the presentation of the City’s schematic park site master plans, from workshop attendees.

Community Comments Regarding the Presentation of Newark Park Site Schematic Plans • Dog Parks
o Ensure that proposed dog parks are suitable in size for users o Consider the proposal of 1 large dog park, rather than the proposal of 4 small/medium dog parks o Ensure that proposed dog parks are accessible for a variety of users o Consider the location of proposed dog parks among other recreation activities, so that dog parks are placed near other recreation areas (play areas, picnic areas, etc.) o Consider the creation of 4 dog parks throughout the proposed Cedar Linear Boulevard Park o Consider the location of a dog park at the north west section of Birch Grove Park, as surrounding neighborhood housing is dense
• Skate Park and Bike Skills Park
o Ensure that size of proposed skate/bike park is compatible for both skateboard and bicycle uses o Consider the relocation of the proposed skate/bike park to a site more central to the City of Newark o Consider the provision of lighting at the skate/bike park to maximize use o Consider placement of skate park at Newark Community Center Park, Birch Grove Park, or Mayhews Landing Park
• Cedar Boulevard Linear Park
o Consider small parking sites along the proposed Cedar Boulevard Linear Park o Ensure that the proposed bicycle path is suitable for cyclists (not too “curvy” and clear connections at intersecting streets)
o Consider the connection of the proposed bicycle path to existing cycle routes in the City of Newark o Consider the location of bike pump track at the proposed Cedar Boulevard Linear Park • Bayshore Park
o Proposed restroom location should be central to park for more access o Consider conversion of proposed amphitheater to a picnic area o Orient the proposed design toward the San Francisco Bay, to highlight the site’s unique location o Proposed lawn should accommodate year-round uses
• Recreational Playing Fields
o Consider the transition of one existing tennis court to a site for soccer use o Existing fields lack lighting and have poor turf management o Existing fields are too small for ideal soccer conditions • Jerry Raber Ash Street Park
o Consider the creation of double volleyball courts, rather than the proposed single volleyball court; this may draw the use of existing volleyball organizations
o As basketball is popular at Jerry Raber Ash Street Park consider the addition of basketball courts here • Funding
o In the selection of proposed projects, the cost of park maintenance should be considered o Non-City funds, such as company sponsorship, should be considered in the selection and creation of proposed projects
o Long-term funding must be considered in the Master Plan Packet Page 2726

NEWARK CITYWIDE PARKS MASTER PLAN
Community Workshop 3 Summary
• Sustainability
o Ensure that proposed features are sustainable and use minimal resources, especially in proposed splash pads and water play areas
o Prioritize maintenance and updates to existing facilities • Impact on the Community
o In the selection of proposed projects, the City must consider the impact (noise, traffic, etc) on existing community adjacent to/near the proposed project site
o Continue to engage the community in the Master Plan process • Playgrounds
o In locating new play areas avoid close proximity to parking areas • Bocce and Volleyball Courts
o Proposed volleyball and bocce courts require regular maintenance • Outdoor Amphitheater and Event Space
o Consider the placement of proposed outdoor amphitheater(s) at Newark Community Park, as related events already occur there
• Lakeshore Park
o Consider regular maintenance and cleaning for better bird management at Lakeshore Park • Water Fountains
o Water fountains should be updated throughout the park system • Lighting
o Lighting should be updated throughout the park system • Inclusive Playground
o Master Plan should identify a specific location for a proposed inclusive playground Packet Page 2727

NEWARK CITYWIDE PARKS MASTER PLAN
Community Workshop 3, Part 1-11/09/16
Notes
Board 1 Board 2
Board 3 Board 4
Packet Page 2728

NEWARK CITYWIDE PARKS MASTER PLAN
Community Workshop 3, Part 2-11/12/16
Notes
Board 1 Board 2
Board 3 Board 4
Packet Page 2729
Board 5 Board 6
Board 7
Packet Page 2730

NEWARK CITYWIDE PARKS MASTER PLAN
Community Workshop 4 Summary
Community Workshop 4 Summary
The fourth and final community workshop was held on May 31st to present the draft Master Plan to the community and to receive comments and questions regarding the draft report.

Community Comments Regarding the Presentation of the Draft Newark Citywide Parks Master Plan • Consideration of All User Groups
o Accessibility should be included in the development of all proposed projects o Meeting a variety of user and recreation needs should be a priority  The City should consider and incorporate opportunities to serve baseball and softball recreation groups
• Timeline of Project Development
o The first 4 project priorities may be addressed in approximately 1.5 years o The development of specific projects will require additional design and community input • Sustainability in Project Development
o Water fountains are desired at Sportsfield Park to reduce reliance on plastic water bottles o Sustainable lighting should be incorporated in project development o The City should consider sustainable water use in all project development • Discussion of Design Specifics
o Decomposed granite is proposed at all dog park projects, with year-round access intended o The development of the proposed bike skills park will require additional design and community input  Dirt facility vs. prefabricated ramp structures
o Restroom updates are desired at Birch Grove Park
o Water supply at proposed dog parks should have a dedicated water line Packet Page 2731

NEWARK CITYWIDE PARKS MASTER PLAN
Community Workshop 4
Notes
Board 1
Board 3 Board 4
Board 2
Packet Page 2732

NEWARK CITYWIDE PARKS MASTER PLAN
Community Workshop 4
Notes
Board 5 Board 6
Packet Page 2733
this page is intentionally blank
Packet Page 2734
Newark Citywide Parks Master Plan

OPINION OF PROBABLE COST
Appendix E – OPINION OF PROBABLE COST
Packet Page 2735
Packet Page 2736
Summary
RHAA Opinion of Probable Costs
Amenity Cost
Bayshore Park

1.0 GROUP PICNIC AREA 1 $                86,800.00

2.0 GROUP PICNIC AREA 2 $                86,800.00

3.0 PLAYGROUND 1 $           1,024,350.00

4.0 PLAYGROUND 2 $              602,900.00

5.0 DOG PARK $              572,040.00

6.0 PLANTING AND IRRIGATION $              241,085.30

7.0 RESTROOM $              300,000.00

8.0 PEDESTRIAN PATHWAY $              200,123.00

9.0 PARKING $              192,640.00
Total 3,306,739.00 $
Birch Grove Par
k

1.0 GROUP PICNIC AREA  $              213,370.00

2.0 UPDATED PLAYGROUNDS $           1,715,717.00

3.0 SPLASH PAD $              400,000.00

4.0 DOG PARK $              503,783.00

5.0 SPORT FACILITIES $              126,000.00

6.0 BIKE SKILLS PARK $              385,700.00

7.0 PLANTING AND IRRIGATION $                35,100.00
Total 3,379,670.00 $
Byington Par
k

1.0 UPDATED PLAYGROUND $              500,740.00

2.0 UPDATED SPLASH PAD $              400,000.00
Total 900,740.00 $
Cedar Boulevard Linear Par
k

1.0 PLAYGROUND 1 $              489,670.00

2.0 PLAYGROUND 2 $              401,010.00

3.0 PLAYGROUND 3 $              588,370.00

4.0 DECORATIVE GARDEN 1 $                77,648.00

5.0 DECORATIVE GARDEN 2 $                32,144.00

6.0 COMMUNITY GARDEN $              453,150.00

7.0 OUTDOOR FITNESS AREA 1 $                47,260.00

8.0 OUTDOOR FITNESS AREA 2 $              127,260.00

9.0 OUTDOOR FITNESS AREA 3 $              167,260.00

10.0 OUTDOOR FITNESS AREA 4 $                87,260.00

11.0 PEDESTRIAN PATHWAY $              348,539.00

12.0 BIKE PATHWAY $              360,588.00

13.0 PEDESTRIAN OVERPASS $              500,000.00

14.0 PLANTING AND IRRIGATION $                39,150.00 Total 3,719,309.00 $
Civic Center Park

1.0 GROUP PICNIC AREA  $              165,160.00

2.0 UPDATED PLAYGROUND $              618,910.00

3.0 SPORT FACILITIES $                66,800.00

4.0 PLANTING AND IRRIGATION $                  3,375.00

5.0 RESTROOM $              300,000.00
Total 1,154,245.00 $
Dumbarton Neighborhood Par
k

1.0 GROUP PICNIC AREA  $                71,165.00

2.0 PLAYGROUND  $              147,580.00

3.0 PLANTING AND IRRIGATION $              428,867.20
23‐Mar‐2017
NEWARK PARKS MASTER PLANS
Summary OPC Page 1

4.0 PEDESTRIAN PATHWAY $                30,162.00
Total 677,775.00 $
Jerry Raber Ash Street Par
k

1.0 GROUP PICNIC AREA  $                48,006.00

2.0 UPDATED PLAYGROUND $              610,280.00

3.0 SPORT FACILITIES $                95,600.00

4.0 DECORATIVE GARDEN  $              241,188.00

5.0 PLANTING AND IRRIGATION $                14,175.00
Total 1,009,249.00 $
Lakeshore Park

1.0 PLAYGROUND  $           1,038,332.00

2.0 OUTDOOR FITNESS AREA 1 $                48,613.00

3.0 OUTDOOR FITNESS AREA 2 $              213,827.00

4.0 OUTDOOR FITNESS AREA 3 $                87,535.00

5.0 OUTDOOR FITNESS AREA 4 $              167,414.00

6.0 PLANTING AND IRRIGATION $                  3,375.00

7.0 UPDATED BOATHOUSE AND RESTROOM $              187,500.00 Total 1,746,596.00 $
Mayhews Landing Par
k

1.0 PLAYGROUND $           1,036,130.00

2.0 SPORT FACILITIES $                47,130.00
Total 1,083,260.00 $
Mirabeau Park

1.0 UPDATED PLAYGROUND $              547,722.00

2.0 SPORT FACILITIES $                85,665.00
Total 633,387.00 $
Musick Park

1.0 UPDATED PLAYGROUND $              682,296.00

2.0 FURNITURE $                  6,000.00

3.0 FENCE $                31,200.00
Total 719,496.00 $
Newark Community Par
k

1.0 GROUP PICNICE AREA 1 $              154,600.00

2.0 GROUP PICNIC AREA 2 $                89,829.00

3.0 GROUP PICNIC AREA 3 $              221,965.00

4.0 GROUP PICNIC AREA 4 $              135,360.00

5.0 PLAYGROUND 1  $              917,650.00

6.0 PLAYGROUND 2 $              688,910.00

7.0 PLAYGROUND 3  $              668,330.00

8.0 PLAYGROUND 4  $              569,030.00

9.0 DOG PARK $              315,648.00

10.0 SPORT FACILITIES $                84,000.00

11.0 PLANTING AND IRRIGATION $                  8,100.00

12.0 UPDATED RESTROOM $              321,000.00
Total 4,174,422.00 $
Shirley Sisk Grove

1.0 PLAYGROUND $              662,165.00

2.0 AMPHITHEATER $              532,400.00

3.0 RESTROOM $              205,000.00

4.0 STORAGE  $                  5,000.00

5.0 PLANTING AND IRRIGATION $                91,300.40

6.0 PEDESRIAN PATHWAY $              197,010.00

7.0 PARKING $              385,761.25
Total 2,078,637.00 $
Sportsfield Par
k

1.0 GROUP PICNIC AREA 1 $              206,883.00

2.0 GROUP PICNIC AREA 2 $                23,189.00

3.0 PLAYGROUND $              731,610.00
Summary OPC Page 2
Packet Page 2737

4.0 SPLASH PAD $              550,000.00

5.0 SPORT FACILITIES $           4,882,294.00

6.0 SKATE PARK $           1,140,450.00

7.0 RESTROOM AND CONCESSION STAND $              500,000.00

8.0 PLANTING AND IRRIGATION $                12,825.00

9.0 UPDATED PEDESTRIAN PATHWAY $              390,478.00

10.0 PARKING $              470,627.50
Total 8,908,357.00 $
Susan Johnson Bridgepoint Park

1.0 PLAYGROUND $              865,450.00

2.0 SPORT FACILITIES $                52,000.00
Total 917,450.00 $
GRAND TOTAL ALL PARKS $        34,409,332.00
Summary OPC Page 3
*Bayshore Park, Dumbarton Neighborhood Park, and Shirley Sisk Grove are expected to be developer-funded projects
Packet Page 2738
Bayshore Park
RHAA Opinion of Probable Costs
ITEM DESCRIPTION QTY UNIT $/UNIT

1.0 GROUP PICNIC AREA 1

1.1 Shelter (1,136 SF) 1 EA $50,000.00 $50,000.00

1.2 Picnic Table (5' x 7') 5 EA $2,000.00 $10,000.00

1.3 BBQ and Counter ‐ Podium (20' x 6') 1 LS $10,000.00 $10,000.00

1.4 Decomposed Granite 3,360 SF $5.00 $16,800.00
Subtotal $86,800.00

2.0 GROUP PICNIC AREA 2

2.1 Shelter (1,136 SF) 1 EA $50,000.00 $50,000.00

2.2 Picnic Table (5' x 7') 5 EA $2,000.00 $10,000.00

2.3 BBQ and Counter ‐ Podium (20' x 6') 1 EA $10,000.00 $10,000.00

2.4 Decomposed Granite 3,360 SF $5.00 $16,800.00
Subtotal $86,800.00

3.0 PLAYGROUND 1

3.1 Play Equipment ‐ Tot Age 9 EA $100,000.00 $900,000.00

3.2 Resilient Paving ‐ Tot Age 3,945 SF $30.00 $118,350.00

3.3 Bench (5.5' x 2') 4 EA $1,500.00 $6,000.00
Subtotal $1,024,350.00

4.0 PLAYGROUND 2

4.1 Play Equipment ‐ School Age 5 EA $100,000.00 $500,000.00

4.2 Resilient Paving ‐ School Age 3,230 SF $30.00 $96,900.00

4.3 Bench (5.5' x 2') 4 EA $1,500.00 $6,000.00
Subtotal $602,900.00
50 DOG PARK
Bayshore Park TOD OPC Page 1

5.0 DOG PARK

5.1 Decomposed Granite 58,394 SF $5.00 $291,970.00

5.2 Concrete Paving 2,720 SF $11.00 $29,920.00

5.3 Dog Park Entry Gate ‐ 2 Door 1 EA $5,000.00 $5,000.00

5.4 Fencing ‐ 6' High
Chain link fence with concrete
band and vinyl coating 1,685 LF $90.00 $151,650.00

5.5 Bench (5.5' x 2') 14 EA $1,500.00 $21,000.00

5.6 Water Fountain Fixture 1 EA $4,500.00 $4,500.00
a. Storm drain line 6" 800 LF $40.00 $32,000.00
b. Water line 1‐1/2" 800 LF $45.00 $36,000.00
Subtotal $572,040.00

6.0 PLANTING AND IRRIGATION

6.1 Tree ‐ 15 gal 65 EA $475.00 $30,875.00

6.2 Tree Bubblers 65 EA $200.00 $13,000.00

6.3 Bio‐Swale Shrub 22,363 SF $3.50 $78,270.50
a. Irrigation 22,363 SF $3.00 $67,089.00

6.4 Turf 86,418 SF $0.60 $51,850.80
Subtotal $241,085.30

7.0 RESTROOM

7.1 Restroom (600 SF) Exc utilities beyond 5' bldg 600 SF $500.00 $300,000.00 Subtotal $300,000.00

8.0 PEDESTRIAN PATHWAY

8.1 Concrete Paving 18,193 SF $11.00 $200,123.00
Subtotal $200,123.00

9.0 PARKING
Bayshore Park TOD OPC Page 1

9.1 Asphaltic Paving  inc curb 19,120 SF $10.00 $191,200.00

9.2 Striping 1,152 LF $1.25 $1,440.00
Subtotal $192,640.00
Total $3,306,739.00
Bayshore Park TOD OPC Page 2
*Bayshore Park is expected to be a developer-funded project Packet Page 2739
Birch Grove Park
RHAA Opinion of Probable Costs
ITEM DESCRIPTION QTY UNIT $/UNIT

1.0 GROUP PICNIC AREA

1.1 Shelter (2,898 SF) 1 EA $90,000.00 $90,000.00

1.2 Picnic Table (5' x 7' 5 EA $2,000.00 $10,000.00

1.3 BBQ and Counter ‐ Podium (20' x 6') 1 EA $10,000.00 $10,000.00

1.4 Decomposed Granite 20,674 SF $5.00 $103,370.00
Subtotal $213,370.00

2.0 UPDATED PLAYGROUNDS

2.1 Updated Play Equipment ‐ School Age 5 EA $100,000.00 $500,000.00

2.2 Updated Play Equipment ‐ Tot Age 7 EA $100,000.00 $700,000.00

2.3 Updated Resilient Paving ‐ School Age 5,114 SF $30.00 $153,420.00

2.4 Updated Resilient Paving ‐ Tot Age 6,106 SF $30.00 $183,180.00

2.5 Shelter (1,136 SF) 1 EA $50,000.00 $50,000.00

2.6 Bench (5.5' x 2') 8 EA $1,500.00 $12,000.00

2.7 Concrete Paving 10,647 SF $11.00 $117,117.00
Subtotal $1,715,717.00

3.0 SPLASH PAD

3.1 Splash Pad 481 SF 1 LS $400,000.00 $400,000.00
Subtotal $400,000.00

4.0 DOG PARK

4.1 Decomposed Granite 54,681 SF $5.00 $273,405.00

4.2 Concrete Paving 1,878 SF $11.00 $20,658.00

4.3 Dog Park Entry Gate ‐ 2 Door 1 EA $5,000.00 $5,000.00

4.4 Fencing ‐ 6' High
Chain link fence with concrete
band and vinyl coating 1,168 LF $90.00 $105,120.00

4.5 Bench (5.5' x 2') 18 EA $1,500.00 $27,000.00

4.6 Shelter (628 SF) 1 EA $40,000.00 $40,000.00

4.7 Picnic Table (5' x 7') 3 EA $2,000.00 $6,000.00

4.8 Water Fountain Fixture 1 EA $4,500.00 $4,500.00
a. Storm drain line 6" 260 LF $40.00 $10,400.00
b. Water line 1‐1/2"  260 LF $45.00 $11,700.00
Subtotal $503,783.00

5.0 SPORT FACILITIES

5.1 Volleyball Court (59' x 29.5') Sand 30x60x2 x $150/CY, inc net 1 EA $22,000.00 $22,000.00

5.2 Bocce Ball Court (60' x 12') $10/SF 2 EA $7,200.00 $14,400.00

5.3 Multi‐Sport Field (140' x 200') ‐ Turf 2 x Fields 1 LS $89,600.00 a. Turf 56,000 SF $0.60 $33,600.00
b. Irrigation 56,000 SF $1.00 $56,000.00
Subtotal $126,000.00

6.0 BIKE SKILLS PARK

6.1 Bike Pump Track
"Speed Ring" 54' x 21' ‐Lumber
Jack 2 LS $42,000.00 $84,000.00

6.2 Bike Pump Track
"Sidewinder" 54' x 54'‐ Lumber
Jack 2 LS $53,000.00 $106,000.00

6.3 Bike Pump Track "Mach 6" 72' x 76' ‐ Lumber Jack 1 LS $75,000.00 $75,000.00

6.4 Bench (5.5' x 2') 12 EA $1,500.00 $18,000.00

6.5 Fence ‐ 6' High 630 LF $90.00 $56,700.00

6.6 Shelter (628 SF) 1 EA $40,000.00 $40,000.00

6.7 Picnic Table (5' x 7') 3 EA $2,000.00 $6,000.00
Subtotal $385,700.00

7.0 PLANTING AND IRRIGATION
Birch Grove Park OPC Page 1

7.1 Tree ‐ 15 gal 52 EA $475.00 $24,700.00

7.2 Tree Bubblers 52 EA $200.00 $10,400.00
Subtotal $35,100.00
Total $3,379,670.00
Birch Grove Park OPC Page 2
Packet Page 2740
Byington Park
RHAA Opinion of Probable Costs
ITEM DESCRIPTION QTY UNIT $/UNIT

1.0 UPDATED PLAYGROUND

1.1 Updated Play Equipment ‐ School Age 4 SF $100,000.00 $400,000.00

1.2 Updated Resilient Paving ‐ School Age 3,358 EA $30.00 $100,740.00 Subtotal $500,740.00

2.0 UPDATED SPLASH PAD

2.1 Updated Splash Pad 1,252 SF 1 EA $400,000.00 $400,000.00 Subtotal $400,000.00
Total $900,740.00
Byington Park OPC Page 1
Cedar Boulevard Linear Park
RHAA Opinion of Probable Costs
ITEM DESCRIPTION QTY UNIT $/UNIT

1.0 PLAYGROUND 1

1.1 Play Equipment ‐ School Age 4 SF $100,000.00 $400,000.00

1.2 Resilient Paving ‐ School Age 2,789 SF $30.00 $83,670.00

1.3 Bench (5.5' x 2') 4 EA $1,500.00 $6,000.00
Subtotal $489,670.00

2.0 PLAYGROUND 2

2.1 Play Equipment ‐ Tot Age 3 SF $100,000.00 $300,000.00

2.2 Resilient Paving ‐ Tot Age 3,167 SF $30.00 $95,010.00

2.3 Bench (5.5' x 2') 4 EA $1,500.00 $6,000.00
Subtotal $401,010.00

3.0 PLAYGROUND 3

3.1 Play Equipment ‐ School Age 4 SF $100,000.00 $400,000.00

3.2 Resilient Paving ‐ School Age 5,879 SF $30.00 $176,370.00

3.3 Bench (5.5' x 2') 8 EA $1,500.00 $12,000.00
Subtotal $588,370.00

4.0 DECORATIVE GARDEN 1

4.1 Planting 8,956 SF $5.00 $44,780.00

4.2 Irrigation 8,956 SF $3.00 $26,868.00

4.3 Bench (5.5' x 2') 4 EA $1,500.00 $6,000.00
Subtotal $77,648.00

5.0 DECORATIVE GARDEN 2

5.1 Planting 3,268 SF $5.00 $16,340.00
5 2 Irrigation 3 268 SF $3 00 $9 804 00
Cedar Blvd Linear Park OPC Page 1

5.2 Irrigation 3,268 SF $3.00 $9,804.00

5.3 Bench (5.5' x 2') 4 EA $1,500.00 $6,000.00
Subtotal $32,144.00

6.0 COMMUNITY GARDEN

6.1 Raised Bed ‐ Amended Soil 29,000 SF x 2.5' H = 2,690 CY 2690 CY $60.00 $161,400.00

6.2 Fence 787 LF $50.00 $39,350.00

6.3 Irrigation 29,050 SF $3.00 $87,150.00

6.4 Decomposed Granite 29,050 SF $5.00 $145,250.00

6.5 Storage Building (175 SF) 4 EA $5,000.00 $20,000.00 Subtotal $453,150.00

7.0 OUTDOOR FITNESS AREA 1

7.1 Outdoor Fitness Equipment 1 EA $40,000.00 $40,000.00

7.2 Concrete Paving 660 SF $11.00 $7,260.00
Subtotal $47,260.00

8.0 OUTDOOR FITNESS AREA 2

8.1 Outdoor Fitness Equipment 3 EA $40,000.00 $120,000.00

8.2 Concrete Paving 660 SF $11.00 $7,260.00
Subtotal $127,260.00

9.0 OUTDOOR FITNESS AREA 3

9.1 Outdoor Fitness Equipment 4 EA $40,000.00 $160,000.00

9.2 Concrete Paving 660 SF $11.00 $7,260.00
Subtotal $167,260.00

10.0 OUTDOOR FITNESS AREA 4

10.1 Outdoor Fitness Equipment 2 EA $40,000.00 $80,000.00

10.2 Concrete Paving 660 SF $11.00 $7,260.00
Cedar Blvd Linear Park OPC Page 1
Packet Page 2741
Subtotal $87,260.00

11.0 PEDESTRIAN PATHWAY

11.1 Concrete Paving 30,049 SF $11.00 $330,539.00

11.2 Bench (5.5' x 2') 12 EA $1,500.00 $18,000.00
Subtotal $348,539.00

12.0 BIKE PATHWAY

12.1 Bike Path Paving ‐ Concrete Saw Cut 30,049 SF $12.00 $360,588.00 Subtotal $360,588.00

13.0 PEDESTRIAN OVERPASS

13.1 Pedestrian Overpass 330 LF 1 LS $500,000.00 $500,000.00 Subtotal $500,000.00

14.0 PLANTING AND IRRIGATION

14.1 Tree ‐ 15 gal 58 EA $475.00 $27,550.00

14.2 Tree Bubbler 58 EA $200.00 $11,600.00
Subtotal $39,150.00
Total $3,719,309.00
Cedar Blvd Linear Park OPC Page 2
Civic Center Park
RHAA Opinion of Probable Costs
ITEM DESCRIPTION QTY UNIT $/UNIT

1.0 GROUP PICNIC AREA

1.1 Shelter (446 SF) 2 EA $30,000.00 $60,000.00

1.2 Picnic Table (5' x 7') 7 EA $2,000.00 $14,000.00

1.3 BBQ and Counter ‐ Podium (20' x 6') 1 EA $10,000.00 $10,000.00

1.4 Decomposed Granite 16,232 SF $5.00 $81,160.00
Subtotal $165,160.00

2.0 UPDATED PLAYGROUND

2.1 Updated Play Equipment ‐ School Age 4 EA $100,000.00 $400,000.00

2.2 Updated Resilient Paving ‐ School Age 6,997 SF $30.00 $209,910.00

2.3 Bench (5.5' x 2') 6 EA $1,500.00 $9,000.00
Subtotal $618,910.00

3.0 SPORT FACILITIES

3.1 Volleyball Court (59' x 29.5') Sand 30x60x2 x $150/CY, inc net 1 EA $22,000.00 $22,000.00

3.2 Multi‐Sport Field (140' x 200') ‐ Turf 1 x Field 1 LS $44,800.00 a. Turf 28,000 SF $0.60 $16,800.00
b. Irrigation 28,000 SF $1.00 $28,000.00
Subtotal $66,800.00

4.0 PLANTING AND IRRIGATION

4.1 Tree ‐ 15 gal 5 EA $475.00 $2,375.00

4.2 Tree Bubblers 5 EA $200.00 $1,000.00
Subtotal $3,375.00

5.0 RESTROOM

5.1 Restroom (600 SF) 600 SF $500.00 $300,000.00
Subtotal $300,000.00
Total $1,154,245.00
Civic Center Park OPC Page 1
Packet Page 2742
Dumbarton Neighborhood Park
RHAA Opinion of Probable Costs
ITEM DESCRIPTION QTY UNIT $/UNIT

1.0 GROUP PICNIC AREA

1.1 Picnic Table (5' x 7') 8 EA $2,000.00 $16,000.00

1.2 Decomposed Granite 11,033 SF $5.00 $55,165.00
Subtotal $71,165.00

2.0 PLAYGROUND

2.1 Play Equipment ‐ School Age 1 EA $100,000.00 $100,000.00

2.2 Resilient Paving ‐ School Age 1,486 SF $30.00 $44,580.00

2.3 Bench (5.5' x 2') 2 EA $1,500.00 $3,000.00
Subtotal $147,580.00

3.0 PLANTING AND IRRIGATION

3.1 Tree ‐ 15 gal 32 EA $475.00 $15,200.00

3.2 Tree Bubblers 32 EA $200.00 $6,400.00

3.3 Bio‐Swale Shrub 52,608 SF $3.50 $184,128.00
a. Irrigation 52,608 SF $3.00 $157,824.00

3.4 Turf 40,822 SF $0.60 $24,493.20
a. Irrigation 40,822 SF $1.00 $40,822.00
Subtotal $428,867.20

4.0 PEDESTRIAN PATHWAY

4.1 Concrete Paving 2,742 SF $11.00 $30,162.00
Subtotal $30,162.00
Total $677,775.00
Dumbarton Neighb Park TOD OPC Page 1
Jerry Raber Ash Street Park
RHAA Opinion of Probable Costs
ITEM DESCRIPTION QTY UNIT $/UNIT

1.0 GROUP PICNIC AREA

1.1 Picnic Table (5' x 7') 10 EA $2,000.00 $20,000.00

1.2 Concrete Paving 2,546 SF $11.00 $28,006.00
Subtotal $48,006.00

2.0 UPDATED PLAYGROUND

2.1 Updated Play Equipment ‐ School Age 3 EA $100,000.00 $300,000.00

2.2 Updated Play Equipment ‐ Tot Age 2 EA $100,000.00 $200,000.00

2.3 Updated Resilient Paving ‐ School Age 2,143 SF $30.00 $64,290.00

2.4 Updated Resilient Paving ‐ Tot Age 1,533 SF $30.00 $45,990.00 Subtotal $610,280.00

3.0 SPORT FACILITIES

3.1 Updated Volleyball Court (59' x 29.5') Sand 30x60x2 x $150/CY, inc net 1 EA $22,000.00 $22,000.00

3.2 Bocce Ball Court (60' x 12') $10/SF 4 EA $7,200.00 $28,800.00

3.3 Multi‐Sport Field (140' x 200') ‐ Turf 1 x Field 1 LS $44,800.00 a. Turf 28,000 SF $0.60 $16,800.00
b. Irrigation 28,000 SF $1.00 $28,000.00
Subtotal $95,600.00

4.0 DECORATIVE GARDEN

4.1 Planting 20,518 SF $5.00 $102,590.00

4.2 Irrigation 20,518 SF $3.00 $61,554.00

4.3 Concrete Paving 7,004 SF $11.00 $77,044.00
Subtotal $241,188.00

5.0 PLANTING AND IRRIGATION

5.1 Tree ‐ 15 gal 21 EA $475.00 $9,975.00

5.2 Tree Bubblers 21 EA $200.00 $4,200.00
Subtotal $14,175.00
Total $1,009,249.00
Jerry Raber Ash Street Park OPC Page 1
*Dumbarton Neighborhood Park is expected to be a developer-funded project Packet Page 2743
Lakeshore Park
RHAA Opinion of Probable Costs

1.0 PLAYGROUND

1.1 Play Equipment ‐ School Age 8 SF $100,000.00 $800,000.00

1.2 Resilient Paving ‐ School Age 7,199 SF $30.00 $215,970.00

1.3  Picnic Table (5' x 7') 6 EA $2,000.00 $12,000.00

1.4 Concrete Paving 942 SF $11.00 $10,362.00
Subtotal $1,038,332.00

2.0 OUTDOOR FITNESS AREA 1

2.1 Outdoor Fitness Equipment 1 EA $40,000.00 $40,000.00

2.2 Concrete Paving 783 SF $11.00 $8,613.00
Subtotal $48,613.00

3.0 OUTDOOR FITNESS AREA 2

3.1 Outdoor Fitness Equipment 5 EA $40,000.00 $200,000.00

3.2 Concrete Paving 1,257 SF $11.00 $13,827.00
Subtotal $213,827.00

4.0 OUTDOOR FITNESS AREA 3

4.1 Outdoor Fitness Equipment 2 EA $40,000.00 $80,000.00

4.2 Concrete Paving 685 SF $11.00 $7,535.00
Subtotal $87,535.00

5.0 OUTDOOR FITNESS AREA 4

5.1 Outdoor Fitness Equipment 4 EA $40,000.00 $160,000.00

5.2 Concrete Paving 674 SF $11.00 $7,414.00
Subtotal $167,414.00

6.0 PLANTING AND IRRIGATION

6.1 Tree ‐ 15 gal 5 EA $475.00 $2,375.00

6.2 Tree Bubbler 5 EA $200.00 $1,000.00
Subtotal $3,375.00

7.0 UPDATED BOATHOUSE AND RESTROOM

7.1 Updated Boathouse and Restroom 375 SF $500.00 $187,500.00 Subtotal $187,500.00
Total $1,746,596.00
Lakeshore Park OPC Page 1
Mayhews Landing Park
RHAA Opinion of Probable Costs
ITEM DESCRIPTION QTY UNIT $/UNIT

1.0 PLAYGROUND

1.1 Updated Play Equipment ‐ School Age 8 EA $100,000.00 $800,000.00

1.2 Updated Resilient Paving ‐ School Age 7,871 SF $30.00 $236,130.00 Subtotal $1,036,130.00

2.0 SPORT FACILITIES

2.1 Volleyball Court (59' x 29.5') Sand 30x60x2 x $150/CY, inc net 1 EA $22,000.00 $22,000.00

2.2 Decomposed Granite 5,026 SF $5.00 $25,130.00
Subtotal $47,130.00
Total $1,083,260.00
Mayhews Landing Park OPC Page 1
Packet Page 2744
Mirabeau Park
RHAA Opinion of Probable Costs
ITEM DESCRIPTION QTY UNIT $/UNIT

1.0 UPDATED PLAYGROUND

1.1 Updated Play Equipment ‐ School Age 4 EA $100,000.00 $400,000.00

1.2 Updated Resilient Paving ‐ School Age 4,441 SF $30.00 $133,230.00

1.3 Picnic Table (5' x 7') 3 EA $2,000.00 $6,000.00

1.4 Concrete Paving 772 SF $11.00 $8,492.00
Subtotal $547,722.00

2.0 SPORT FACILITIES

2.1 Volleyball Court (59' x 29.5') Sand 30x60x2 x $150/CY, inc net 1 EA $22,000.00 $22,000.00

2.2 Decomposed Granite 4,333 SF $5.00 $21,665.00

2.3 Half Court Basketball  1 EA $30,000.00 $30,000.00

2.4 Wood Bench (5.5' x 2') 8 EA $1,500.00 $12,000.00
Subtotal $85,665.00
Total $633,387.00
Mirabeau Park OPC Page 1
Musick Park
RHAA Opinion of Probable Costs
ITEM DESCRIPTION QTY UNIT $/UNIT

1.0 UPDATED PLAYGROUND

1.1 Updated Play Equipment ‐ School Age 5 EA $100,000.00 $500,000.00

1.2 Updated Resilient Paving ‐ School Age 5,481 SF $30.00 $164,430.00

1.3 Wood Bench (5.5' x 2') 6 EA $1,500.00 $9,000.00

1.4 Concrete Paving 806 SF $11.00 $8,866.00
Subtotal $682,296.00

2.0 FURNITURE

2.1 Wood Bench (5.5' x 2') 4 EA $1,500.00 $6,000.00
Subtotal $6,000.00

3.0 FENCE

3.1 Fence ‐ 4' High
Chain link fence with concrete
band and vinyl coating 390 LF $80.00 $31,200.00
Subtotal $31,200.00
Total $719,496.00
Musick Park OPC Page 1
Packet Page 2745
Newark Community Park
RHAA Opinion of Probable Costs
ITEM DESCRIPTION QTY UNIT $/UNIT

1.0 GROUP PICNICE AREA 1

1.1 Shelter (1,136 SF) 1 EA $50,000.00 $50,000.00

1.2 Picnic Table (5' x 7') 5 EA $2,000.00 $10,000.00

1.3 BBQ and Counter ‐ Podium (20' x 6') 1 EA $10,000.00 $10,000.00

1.4 Decomposed Granite 16,920 SF $5.00 $84,600.00
Subtotal $154,600.00

2.0 GROUP PICNIC AREA 2

2.1 Shelter (628 SF) 1 EA $40,000.00 $40,000.00

2.2 Picnic Table (5' x 7') 6 EA $2,000.00 $12,000.00

2.3 Concrete Paving 3,439 SF $11.00 $37,829.00
Subtotal $89,829.00

3.0 GROUP PICNIC AREA 3

3.1 Shelter (1,136 SF) 1 EA $50,000.00 $50,000.00

3.2 Picnic Table (5' x 7') 5 EA $2,000.00 $10,000.00

3.3 BBQ and Counter ‐ Podium (20' x 6') 1 EA $10,000.00 $10,000.00

3.4 Concrete Paving 13,815 SF $11.00 $151,965.00
Subtotal $221,965.00

4.0 GROUP PICNIC AREA 4

4.1 Shelter (2,898 SF) 1 EA $60,000.00 $60,000.00

4.2 Picnic Table (5' x 7') 7 EA $2,000.00 $14,000.00

4.3 BBQ and Counter ‐ Podium (20' x 6') 1 EA $10,000.00 $10,000.00

4.4 Decomposed Granite 10,272 SF $5.00 $51,360.00
Subtotal $135,360.00

5.0 PLAYGROUND 1

5.1 Updated Play Equipment ‐ School Age 7 EA $100,000.00 $700,000.00

5.2 Updated Resilient Paving ‐ School Age 7,155 SF $30.00 $214,650.00

5.3 Bench (5.5' x 2') 2 EA $1,500.00 $3,000.00
Subtotal $917,650.00

6.0 PLAYGROUND 2

6.1 Updated Play Equipment ‐ Tot Age 5 EA $100,000.00 $500,000.00

6.2 Updated Resilient Paving ‐ Tot Age 5,997 SF $30.00 $179,910.00

6.3 Bench (5.5' x 2') 6 EA $1,500.00 $9,000.00
Subtotal $688,910.00

7.0 PLAYGROUND 3

7.1 Updated Play Equipment ‐ School Age 5 EA $100,000.00 $500,000.00

7.2 Updated Resilient Paving ‐ School Age 5,511 SF $30.00 $165,330.00

7.3 Bench (5.5' x 2') 2 EA $1,500.00 $3,000.00
Subtotal $668,330.00

8.0 PLAYGROUND 4

8.1 Play Equipment ‐ Tot Age 5 EA $100,000.00 $500,000.00

8.2 Resilient Paving ‐ Tot Age 2,201 SF $30.00 $66,030.00

8.3 Bench (5.5' x 2') 2 EA $1,500.00 $3,000.00
Subtotal $569,030.00

9.0 DOG PARK

9.1 Decomposed Granite 36,567 SF $5.00 $182,835.00

9.2 Concrete Paving 2,133 SF $11.00 $23,463.00

9.3 Fencing ‐ 6' High
Chain link fence with concrete
band and vinyl coating 890 LF $90.00 $80,100.00

9.4 Bench (5.5' x 2') 8 EA $1,500.00 $12,000.00

9.5 Water Fountain Fixture 1 EA $4,500.00 $4,500.00
Newark Community Park OPC Page 1
a. Storm drain line 6" 150 LF $40.00 $6,000.00
b. Water line 1‐1/2" 150 LF $45.00 $6,750.00
Subtotal $315,648.00

10.0 SPORT FACILITIES

10.1 Volleyball Court (59' x 29.5') Sand 30x60x2 x $150/CY, inc net 2 EA $22,000.00 $44,000.00

10.2 Full Court Basketball 1 EA $40,000.00 $40,000.00
Subtotal $84,000.00

11.0 PLANTING AND IRRIGATION

11.1 Tree ‐ 15 gal 12 EA $475.00 $5,700.00

11.2 Tree Bubblers 12 EA $200.00 $2,400.00
Subtotal $8,100.00

12.0 UPDATED RESTROOM

12.1 Updated Restroom 642 SF $500.00 $321,000.00
Subtotal $321,000.00
Total $4,174,422.00
Newark Community Park OPC Page 2
Packet Page 2746
Shirley Sisk Grove
RHAA Opinion of Probable Costs
ITEM DESCRIPTION QTY UNIT $/UNIT

1.0 PLAYGROUND

1.1  Play Equipment ‐ School Age 5 EA $100,000.00 $500,000.00

1.2 Resilient Paving ‐ School Age 4,836 SF $30.00 $145,080.00

1.3 Bench (5.5' x 2') 6 EA $1,500.00 $9,000.00

1.4 Concrete Paving 735 SF $11.00 $8,085.00
Subtotal $662,165.00

2.0 AMPHITHEATER

2.1 Outdoor Stage  2,716 SF, 4' High 402 CY $1,200.00 $482,400.00

2.2 Stage shelter (1,825 SF) 1 EA $50,000.00 $50,000.00 Subtotal $532,400.00

3.0 RESTROOM

3.1 Restroom (410 SF) 410 SF $500.00 $205,000.00
Subtotal $205,000.00

4.0 STORAGE

4.1 Storage Building (410 SF) 1 EA $5,000.00 $5,000.00
Subtotal $5,000.00

5.0 PLANTING AND IRRIGATION

5.1 Tree ‐ 15 gal 26 EA $475.00 $12,350.00

5.2 Tree Bubblers 26 EA $200.00 $5,200.00

5.3 Turf 46,094 SF $0.60 $27,656.40

5.4 Irrigation 46,094 SF $1.00 $46,094.00
Subtotal $91,300.40

6.0 PEDESRIAN PATHWAY

6.1 Concrete Paving 17,910 SF $11.00 $197,010.00
Subtotal $197,010.00

7.0 PARKING

7.1 Asphaltic Paving inc curb 38,571 SF $10.00 $385,710.00

7.2 Crosswalk Striping 41 LF $1.25 $51.25
Subtotal $385,761.25
Total $2,078,637.00
Shirley Sisk Grove OPC Page 1
Sportsfield Park
RHAA Opinion of Probable Costs
ITEM DESCRIPTION QTY UNIT $/UNIT

1.0 GROUP PICNIC AREA 1

1.1 Shelter (1,120 SF) 1 EA $40,000.00 $40,000.00

1.2 Picnic Table (5' x 7') 5 EA $2,000.00 $10,000.00

1.3 BBQ and Counter ‐ Podium (20' x 6') 1 EA $10,000.00 $10,000.00

1.4 Concrete Paving 13,353 SF $11.00 $146,883.00
Subtotal $206,883.00

2.0 GROUP PICNIC AREA 2

2.1 Picnic Table (5' x 7') 5 EA $2,000.00 $10,000.00

2.2 Concrete Paving 1,199 SF $11.00 $13,189.00
Subtotal $23,189.00

3.0 PLAYGROUND

3.1 Play Equipment ‐ School Age 6 EA $100,000.00 $600,000.00

3.2 Resilient Paving ‐ School Age 3,987 SF $30.00 $119,610.00

3.3 Bench (5.5' x 2') 8 EA $1,500.00 $12,000.00
Subtotal $731,610.00

4.0 SPLASH PAD

4.1 Splash Pad 1,975 SF 1 LS $550,000.00 $550,000.00
Subtotal $550,000.00

5.0 SPORT FACILITIES

5.1 Artificial Turf Field: (1) Regulation Soccer Field, (2) Youth Soccer Field, (1) Baseball Field 4 x Fields 1 LS $4,400,214.00 a. Artificial Turf 258,278 SF $9.00 $2,324,502.00
b. Irrigation Irrigate to clean / cool Fields 258,278 SF $1.00 $258,278.00 c. Soccer Goal (Nets, Wheels ‐ 1 Pair) 2 EA $3,200.00 $6,400.00 d. Backstop  1 EA $33,600.00 $33,600.00
e. Baseball Bases and Home Plate (set) 1 EA $2,600.00 $2,600.00 f. Lighting Per Field 4 EA $250,000.00 $1,000,000.00
g. Subdrainage 20' o.c. 258,278 SF $3.00 $774,834.00

5.2 Multi‐Sport turf field (200' x 140') 4 x Fields 1 LS $179,200.00 a. Turf 112,000 SF $0.60 $67,200.00
b. Irrigation 112,000 SF $1.00 $112,000.00

5.3 Multi‐Sport turf field (300' x 200') 2 x Fields 1 LS $192,000.00 a. Turf 120,000 SF $0.60 $72,000.00
b. Irrigation 120,000 SF $1.00 $120,000.00

5.4 Regulation Soccer Field (330' x 210') 2 x Fields 1 LS $110,880.00 a. Turf 69,300 SF $0.60 $41,580.00
b. Irrigation 69,300 SF $1.00 $69,300.00
Subtotal $4,882,294.00

6.0 SKATE PARK

6.1 Skate Park 18,047 SF $50.00 $902,350.00

6.2 Bench (5.5' x 2') 9 EA $1,500.00 $13,500.00

6.3 Fence ‐ 6' High 540 LF $90.00 $48,600.00

6.4 Shelter (628 SF) 1 EA $40,000.00 $40,000.00

6.5 Picnic Table (5' x 7') 3 EA $2,000.00 $6,000.00

6.6 Lighting  35' pole  w/ 4 light fixtures  4 EA $32,500.00 $130,000.00 Subtotal $1,140,450.00

7.0 RESTROOM AND CONCESSION STAND

7.1 Restroom and Concession Stand (1,000 SF) 1,000 SF $500.00 $500,000.00 Subtotal $500,000.00

8.0 PLANTING AND IRRIGATION

8.1 Tree ‐ 15 gal 19 EA $475.00 $9,025.00

8.2 Tree Bubblers 19 EA $200.00 $3,800.00
Sportsfield Park OPC Page 1
*Shirley Sisk Grove is expected to be a developer-funded project Packet Page 2747
Subtotal $12,825.00

9.0 UPDATED PEDESTRIAN PATHWAY

9.1 Concrete Paving 35,498 SF $11.00 $390,478.00
Subtotal $390,478.00

10.0 PARKING

10.1 Asphaltic Paving  inc curb 47,055 SF $10.00 $470,550.00

10.2 Striping 62 LF $1.25 $77.50
Subtotal $470,627.50
Total $8,908,357.00
Sportsfield Park OPC Page 2
Susan Johnson Bridgepoint Park
RHAA Opinion of Probable Costs
ITEM DESCRIPTION QTY UNIT $/UNIT

1.0 PLAYGROUND

1.1 Updated Play Equipment ‐ School Age 7 EA $100,000.00 $700,000.00

1.2 Updated Resilient Paving ‐ School Age 5,515 SF $30.00 $165,450.00 Subtotal $865,450.00

2.0 SPORT FACILITIES

2.1 Volleyball Court (59' x 29.5') Sand 30x60x2 x $150/CY, inc net 1 EA $22,000.00 $22,000.00

2.2 Half Court Basketball 1 EA $30,000.00 $30,000.00
Subtotal $52,000.00
Total $917,450.00
Susan Johnson Bridgepointe Park OPC Page 1
Packet Page 2748
Newark Citywide Parks Master Plan

PROJECTS BY PRIORITY
Appendix F – PROJECTS BY PRIORITY
Packet Page 2749
Packet Page 2750
Amenity Cost Priority Group
Birch Grove DOG PARK $        503,783.00 1
Community Park DOG PARK 315,648.00 $         1
Sportsfield SPORT FACILITIES 4,403,414.00 $      1
Sportsfield SKATE PARK $     1,140,450.00 1
Sportsfield UPDATED PEDESTRIAN$        390,478.00 1
Civic Center Park RESTROOM 300,000.00 $         2 Priortiy Group Totals Ash Street SPORT FACILITIES (Boc $           95,600.00 2 Group 1 6,753,773.00 $ Community Park UPDATED RESTR $        321,000.00 2 Group 2 2,795,236.65 $ Sisk Grove PLAYGROUND $        662,165.00 2 Group 3 1,337,445.00 $ Sisk Grove AMPHITHEATER $        532,400.00 2 Group 4 2,101,084.50 $ Sisk Grove RESTROOM $        205,000.00 2 Group 5 4,025,872.00 $ Sisk Grove STORAGE  $             5,000.00 2 Group 6 3,056,930.00 $ Sisk Grove PLANTING AND IRRIGA $           91,300.40 2 Group 7 7,540,973.00 $ Sisk Grove PEDESRIAN PATHWAY 197,010.00 $         2 Group 8 2,335,973.00 $ Sisk Grove PARKING $        385,761.25 2
Civic Center Park GROUP PICNIC A$        165,160.00 3
Civic Center Park UPDATED PLAYG$        618,910.00 3
Civic Center Park PLANTING AND  3,375.00 $              3 Sportsfield SPLASH PAD $        550,000.00 3
Sportsfield RESTROOM AND CON 500,000.00 $         4
Sportsfield  PLANTING AND IRRIG $           14,175.00 4 Sportsfield GROUP PICNIC AREA 1 $        206,883.00 4
Sportsfield GROUP PICNIC AREA 2 $           23,189.00 4 Sportsfield PARKING $        470,627.50 4
Sportsfield  PLAYGROUND $        731,610.00 4
Community Park GROUP PICNICE  154,600.00 $         4
Birch Grove UPDATED PLAYGROU $     1,715,717.00 5
Birch Grove PLANTING AND IRRIG $           35,100.00 5
Birch Grove SPLASH PAD $        400,000.00 5
Birch Grove BIKE SKILLS PARK 385,700.00 $         5
Ash Street GROUP PICNIC AREA  48,006.00 $            5
Ash Street UPDATED PLAYGROUN $        610,280.00 5
Ash Street DECORATIVE GARDEN  241,188.00 $         5
Ash Street PLANTING AND IRRIGA $           14,175.00 5
Musick FENCE $           31,200.00 5
Community Park GROUP PICNIC A $           89,829.00 5
Community Park SPORT FACILITIE $           84,000.00 5
Community Park PLANTING AND  8,100.00 $              5
Linear Park PEDESTRIAN PATHWA $        348,539.00 5
Linear Park BIKE PATHWAY $        360,588.00 5
Linear Park PLANTING AND IRRIG 39,150.00 $            5 Birch Grove SPORT FACILITIES 126,000.00 $         6
Linear Park PLAYGROUND 2 401,010.00 $         6
Linear Park DECORATIVE GARDEN $           77,648.00 6
Linear Park COMMUNITY GARDEN$        453,150.00 6
Linear Park OUTDOOR FITNESS AR$           47,260.00 6
1 Packet Page 2751
Linear Park OUTDOOR FITNESS AR$        127,260.00 6
Linear Park OUTDOOR FITNESS AR$           87,260.00 6
Civic Center Park SPORT FACILITIE $           66,800.00 6 Lakeshore PLANTING AND IRRIGA $             3,375.00 6
Lakeshore UPDATED BOATHOUSE $        187,500.00 6
Musick FURNITURE $             6,000.00 6
Community Park GROUP PICNIC A $        221,965.00 6
Birch Grove GROUP PICNIC AREA  213,370.00 $         6
Lakeshore PLAYGROUND  $     1,038,332.00 6
Musick UPDATED PLAYGROUND 682,296.00 $         7
Linear Park PLAYGROUND 1 489,670.00 $         7
Linear Park PLAYGROUND 3 588,370.00 $         7
Linear Park OUTDOOR FITNESS AR$        167,260.00 7
Mayhews Landing PLAYGROUND 1,036,130.00 $      7
Mayhews Landing SPORT FACILIT 47,130.00 $            7
Mirabeau UPDATED PLAYGROUN 547,722.00 $         7
Mirabeau SPORT FACILITIES $           85,665.00 7
Community Park GROUP PICNIC A $        135,360.00 7
Community Park PLAYGROUND 1 917,650.00 $         7
Community Park PLAYGROUND 2 688,910.00 $         7
Community Park PLAYGROUND 3 668,330.00 $         7
Community Park PLAYGROUND 4 569,030.00 $         7
Bridgepoint PLAYGROUND $        865,450.00 7
Bridgepoint SPORT FACILITIES 52,000.00 $            7
Lakeshore OUTDOOR FITNESS AR 48,613.00 $            8
Lakeshore OUTDOOR FITNESS AR 213,827.00 $         8
Lakeshore OUTDOOR FITNESS AR 87,535.00 $            8
Lakeshore OUTDOOR FITNESS AR 167,414.00 $         8
Linear Park DECORATIVE GARDEN $           32,144.00 8
Byington UPDATED PLAYGROUND $        500,740.00 8
Byington UPDATED SPLASH PAD 400,000.00 $         8
Linear Park PEDESTRIAN OVERPA 500,000.00 $         8
Bayshore GROUP PICNIC AREA 1 86,800.00 $            Constrution by Develeper Bayshore GROUP PICNIC AREA 2 86,800.00 $            Constrution by Develeper Bayshore PLAYGROUND 1 1,024,350.00 $      Constrution by Develeper Bayshore PLAYGROUND 2 $        602,900.00 Constrution by Develeper Bayshore DOG PARK $        572,040.00 Constrution by Develeper Bayshore PLANTING AND IRRIGAT $        241,085.30 Constrution by Develeper Bayshore RESTROOM $        300,000.00 Constrution by Develeper Bayshore PEDESTRIAN PATHWAY $        200,123.00 Constrution by Develeper Bayshore PARKING $        192,640.00 Constrution by Develeper Dumbarton Park GROUP PICNIC A $            Constrution by Develeper 71,165.00 Dumbarton Park PLAYGROUND  147,580.00 $         Constrution by Develeper Dumbarton Park PLANTING AND  428,867.20 $         Constrution by Develeper Dumbarton Park PEDESTRIAN PAT $            Constrution by Develeper 30,162.00 2 Packet Page 2752
Newark Citywide Parks Master Plan

GRANT FUNDING
Appendix G – GRANT FUNDING
Packet Page 2753
Packet Page 2754

POTENTIAL PARKS AND RECREATION GRANT FUNDING SOURCES
The grant sources listed below are illustrative of the types of grants that organizations, foundations and major corporations offer for community facilities and recreation /cultural programs similar to those included in the Newark Parks and Recreation Master Plan. While the funding windows for some of these programs may have passed, many of them are offered annually or at other intervals. The City may also consider opportunities where it can partner with local non-profit groups that would be eligible for grants that are not offered to municipal agencies such as the City.

Community Garden Projects Support
Scotts Miracle-Gro: GRO1000 Grassroots Grants
The Scotts Miracle-Gro Company’s GRO1000 Grassroots Grants help foster the development of gardens and green spaces in the United States. Grants of up to $1,500 are awarded to local communities throughout the country to help bring edible gardens, flower gardens, and public green spaces to more neighborhoods.

The focus is on garden and green space beautification projects that incorporate the involvement and engagement of neighborhood residents and foster a sense of community. Eligible applicants include nonprofit organizations, educational institutions, and government agencies.

Funds Available for Environmental Collaborations
Environmental Protection Agency
The Environmental Justice Collaborative Problem-Solving Cooperative Agreement Program supports community-based organizations to collaborate and partner with other stakeholders as they develop and implement solutions that address environmental and public health issues at the local level.

Support for Community Improvement Projects Nationwide
Lowe’s Charitable and Educational Foundation: Community Partners The Lowe’s Charitable and Educational Foundation is dedicated to enhancing the quality of life in the communities where Lowe’s operates stores and distribution centers throughout the United States. The Foundation’s Community Partners grant program supports nonprofit organizations and local municipalities undertaking high-need projects such as building renovations and upgrades, grounds improvements, technology upgrades, and safety improvements. Most grants range from $10,000 to $25,000.

Grants Promote Youth Baseball and Softball Programs
Baseball Tomorrow Fund
The Baseball Tomorrow Fund (BTF), a joint initiative between Major League Baseball and the Major League Baseball Players Association, promotes the growth of youth baseball and softball in the United States, and worldwide, by funding programs that encourage youth participation in the sport. Grants may be used to finance a new program, expand or improve an existing program, undertake a new collaborative effort, or obtain facilities or equipment necessary for youth baseball or softball programs. Grants average around $40,000.

Funds Available to Protect Wetlands
Fish and Wildlife Service
The NAWCA (North American Wetlands Conservation Act) U.S. Small Grants program supports public-private partnerships that involve long-term protection, restoration, enhancement, or establishment of wetlands and associated uplands habitats for the benefit of all wetlands-associated migratory birds.

Support for the Integration of Arts in Community
Revitalization
Kresge Foundation: Arts and Culture Program, Local Systems The Kresge Foundation’s Arts and Culture Program seeks to build strong, healthy cities nationwide by promoting the integration of arts and culture in community revitalization. The Local Systems focus area funds projects that test the integration of arts and culture within municipal systems and other non-arts disciplines. Support is provided for cross-sector/cross-disciplinary projects that embed arts and culture into local systems such as municipal departments, community financial networks, comprehensive planning efforts, human services networks, regional food hubs, etc. Applicants may be anchor institutions in any sector that have a stake in and are located in a low-income, disinvested

APPENDIX
Packet Page 2755
community. Applicants may also be nonprofit community partners, nonprofit artist collaboratives, and government entities.

Support for Urban Infrastructure Efforts
Surdna Foundation: Sustainable Environments Program
The Surdna Foundation is dedicated to fostering just and sustainable communities throughout the United States. The Foundation’s Sustainable Environments Program works to overhaul the U.S.’s outdated and crumbling infrastructure with an approach that fosters healthy, sustainable, and just communities. By focusing on urban areas and their surrounding suburbs, the Foundation seeks solutions that connect and improve these infrastructure systems in ways that maximize positive impacts and minimize negative environmental, economic, and social consequences. The four main categories of work in this program area include the following: Sustainable Transportation Networks and Equitable Development Patterns, Energy Efficiency in the Built Environment, Urban Water Management, and Regional Food Supply. Nonprofit organizations may submit online letters of inquiry at any time.

Grants to Enhance Public Greenspaces Nationwide
GRO1000 Gardens and Green Spaces Grant Awards Program
The GRO1000 Gardens and Green Spaces Grant Awards Program, an initiative of The United States Conference of Mayors and the Scotts Miracle-Gro Company, promotes mayoral leadership in the development of greenscapes across the nation. Every municipality in the United States may nominate one new or one substantial addition to an existing public garden, edible garden, or green space within their community. All garden and green space projects initiated by city governments are eligible, including projects developed with community garden groups and other community partners. The four focal areas of the GRO1000 program include: Outdoor Play - creating natural playgrounds for youth; Urban Revitalization - transforming vacant and abandoned properties; Nature Gardens - increasing pollinator-friendly gardens and landscapes; and Food Deserts - providing access to fresh healthy foods. Four winning cities will each receive a total of $40,000 in monetary funds and products.

Programs Advancing Organic Farming Support
UNFI Foundation
The UNFI Foundation funds nonprofit organizations across the United States that support the development of healthy, organic foods and food practices, and promote the health of our planet. The focus is on organizations that work to increase organic agriculture, provide research and science to develop organic farming practices, protect the biodiversity of U.S. seed supply and the stewardship of genetic resources of organic seed, teach organic farming practices that promote conservation of resources, and foster the next generation of organic farmers.

Packet Page 2756
City of Newark

CITYWIDE PARKS MASTER PLAN
Packet Page 2757
City Council: May 25, 2023
Citywide Parks
Master Plan Update
Packet Page 2758
City Council: May 25, 2023
Citywide Parks Master Plan Update

BACKGROUND
• 2016 City Council awarded contract to RHAA for the first Citywide Parks Master Plan
• 2017 City Council adopts the Citywide Parks Master Plan • Four priority projects recommended
• Three of the four the priority projects have been
completed
Packet Page 2759
City Council: May 25, 2023
Citywide Parks Master Plan Update
NewBark Dog Park Mel Nunes Sportsfield Artificial
Turf Fields & Skate Park
Packet Page 2760
City Council: May 25, 2023
Citywide Parks Master Plan Update
June Summer Fall Late Fall/
Winter
2024
Winter
Needs
Assessment
* Community
Engagement
Gap
Analysis
Priority
Setting &
Action Plan
*Community
Engagement
City Council
Adoption of
Citywide
Parks Master
Plan Update
Project
Initiation
Packet Page 2761
City Council: May 25, 2023
Citywide Parks Master Plan Update
Thank you!
Questions?
Packet Page 2762
RESOLUTION NO.

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

NEWARK AUTHORIZING THE CITY MANAGER TO

EXECUTE A CONTRACTUAL SERVICES AGREEMENT

WITH RHAA LANDSCAPE ARCHITECTURE & PLANNING
AND AUTHORIZING AN AMENDMENT OF THE 2022-2024

BIENNIAL BUDGET AND CAPITAL IMPROVEMENT PLAN
FOR FISCAL YEAR 2023 TO PROVIDE FUNDING FOR THE

CITYWIDE PARKS MASTER PLAN UPDATE
WHEREAS, in 2016 the City contracted with RHAA Landscape Architecture & Design for the development of the Citywide Parks Master Plan; and WHEREAS, in 2017 City Council approved a Citywide Parks Master Plan to create a framework for the future provision of parks in the City of Newark; and WHEREAS, the 2017 Citywide Parks Master Plan outlined priority projects based on community input; and
WHEREAS, the Citywide Parks Master Plan is in need of an update to reflect the evolving park trends, demographic changes, and development in Newark; and WHEREAS, based on staff’s evaluation, RHAA Landscape Architecture & Planning was determined to be a qualified firm for the Project; and
WHEREAS, RHAA Landscape Architecture & Planning costs associated with this Project are not-to-exceed $148,275; and
WHEREAS, staff recommends amending the 2022-2024 Biennial Budget and Capital Improvement Plan appropriating $148,275 from the Park Impact Fund (624) to provide funding for the Citywide Parks Master Plan Update.

NOW THEREFORE, BE IT RESOLVED that the City Council hereby authorizes the City Manager to execute the Contractual Services Agreement with RHAA Landscape Architecture & Design, in an amount not-to-exceed $148,275, in a form approved by the City Attorney.

BE IT FURTHER RESOLVED that the City Manager is authorized to take all actions necessary to effectuate the intent of this resolution.

BE IT FURTHER RESOLVED that the City Council of the City of Newark hereby authorizes an amendment to the 2022-2024 Biennial Budget and Capital Improvement Plan by appropriating $148,275 for fiscal year 2023, and allow staff to roll forward any unspent funds, as follows:

FROM:

Description Account Amount
Packet Page 2763
Park Impact Fund Balance 624.3000 $148,275
TO:

Description Account Amount
Citywide Park Master Plan Update 624.90.094.6220 $148,275 Packet Page 2764
Item  F. 2.

DATE 05/25/2023
TO Honorable Mayor and City Council Members
FROM Jennifer Solito, Human Resources Director
SUBJECT    Adopt a resolution approving an exception to the 180-day wait period for the post-retirement employment of Joella Kapu as an extra-help rehired annuitant Public Safety Dispatcher.

SUMMARY AND RECOMMENDATION
Staff recommends that City Council, by resolution, approve an exception to the 180-day wait period required for post-retirement employment under the California Public Employees Retirement System (PERS) regulations, in order to return Joella Kapu to employment as an extra-help rehired annuitant Public Safety Dispatcher to fill operational staffing needs.

BACKGROUND
Under Government Code section 7522.56, California Public Employees Retirement System (PERS), benefit recipients can work up to 960 hours per fiscal year as an extra help rehired annuitant in order to assist with work to prevent the stoppage of public business.  There is a current need to fill dispatcher shifts as a result of various extended employee leaves, vacation coverage, and relief shift coverage.

Joella Kapu was hired by the City as a Public Safety Dispatcher on September 11, 2006, and retired from City service on May 3, 2023.  Typically, there is a 180-day waiting period required before a retiree can return to work as a rehired annuitant. This break in service may be waived through City Council action based on operational need and so long as the work performed is of limited duration.

DISCUSSION/ANALYSIS
The Communications Division in the Police Department is currently experiencing difficulties filling vacant dispatch shifts. A recruitment is underway to fill the vacancy left by Ms. Kapu. To ensure timely response to calls in dispatch, no standing backlog of calls, and to avoid gaps in shift coverage, Ms. Kapu may be employed as an extra-help rehired annuitant to provide shift coverage as needed.  However, Ms. Kapu has not been retired 180 days to meet the break in service required by PERS.  Consistent with state law requirements, the City Council may make an exception to the service break requirement through an adopted resolution. The Council must approve the exception and certify the appointment as well as the operational need of the appointment during a regular public meeting through a non-consent action item.

Packet Page 2765
FISCAL IMPACT
There is no fiscal impact of this action as salary savings from the current vacancy will be used for this extra-help temporary appointment.

REVIEW AND APPROVAL
Prepared by – Jennifer Solito, Human Resources Director Reviewed by - Lenka Hovorka, Assistant City Manager
Reviewed by - Krysten Lee, Finance Director
Reviewed by – Kristopher J. Kokotaylo, City Attorney
Approved by – David J. Benoun, City Manager
Attachments
180 Day Waiver Resolution
Kapu Appointment Document
Packet Page 2766
RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
NEWARK APPROVING AN EXCEPTION TO THE 180 DAY

WAIT PERIOD FOR THE POST-RETIREMENT

EMPLOYMENT OF JOELLA KAPU AS AN EXTRA-HELP

REHIRED ANNUITANT DISPATCHER
WHEREAS, in compliance with Government Code Section 7522.56, the City Council of the City of Newark (“City Council”) must provide the California Public Retirement System (“CalPERS”) this certification resolution when hiring a retiree before 180 days has passed since their retirement date; and
WHEREAS,Joella Kapu (“Kapu”)retired from theCity of Newark (“City”)in the position of Public Safety Dispatcher effective May 3, 2023 and is beyond the normal retirement age; and WHEREAS, Government Code Section 7522.56 requires that post-retirement employment commence no earlier than 180 days after the retirement date of May 3, 2023 without this certification resolution; and
WHEREAS, Government Code Section 7522.56 provides that this exception to the 180 day wait period shall not apply if the retiree accepts any type of retirement incentive; and WHEREAS, the City Council, the City and Kapu certify that Kapu has not and will not receive a Golden Handshake or any other retirement-related incentive; and WHEREAS, the City Council hereby appoints Kapu as an extra help retired annuitant to perform Public Safety Dispatch duties for the City consistent with Government Code Section 21224, effective June 1, 2023; and
WHEREAS, the entire employment agreement, contract or appointment document between Kapu and the City has been reviewed by this body and is attached herein; and WHEREAS, no matters, issues, terms or conditionsrelated to this extra help employment and appointment have been or will be placed on a consent calendar; and WHEREAS, the employment shall be limited to no more than 960 hours per fiscal year; and
WHEREAS, the compensation paid to retirees cannot be less than the minimum nor exceed the maximum monthly base salary paid to other employees performing comparable duties divided by 173.33 to equal the hourly rate; and
WHEREAS, the minimum base salary for the Public Safety Dispatcher position is $7,649.66 per month and the hourly equivalent is $44.13, and the maximum base salary for this position is $9,298.21 and the hourly equivalent is $53.64; and WHEREAS, the hourly rate paid to Kapu will be $53.64; and Packet Page 2767
WHEREAS, Kapu has not and will not receive any other benefit, incentive compensation in lieu of benefits or any other form of compensation in addition to this hourly pay rate.

NOW, THEREFORE, BE IT RESOLVED that the City Council hereby certifies the nature of the employment of Kapu as described herein and finds that this appointment is necessary to complete Public Safety Dispatcher work of limited duration, that Kapu has over eighteen years of experience as a Public Safety Dispatcher to complete such work, and that such extra-help work is necessary to ensure continuity of Police Department operations.

Packet Page 2768

PERSONNEL ACTION REQUEST
Employee Name Employee Number
Status Date of Last Merit/ Step Increase Next Evaluation/Increase Date Type of Action 1 Type of Action 2 ype of Action 3
From:

Position:

Department:

Division:

Hourly Rate:

Step/Range:

To:

Position:

Department:

Division:

Hourly Rate:

Step/Range:

Activity Distribution:

Remarks:

Remark 1:

Remark 2:

Remark 3:

Remark 4:

Remark 5:

Remark
Distribution: Original - HR Copy - Payroll, Department, Employee Revised 11/04/2022

4. Division Head

7. City Manager

5. Department Head
Signatures:

City Manager and Finance Director signature is required for all Regular, Temporary PERS, Retired Annuitant and Limited Term employees.

Type of Action 4 Type of Action 5
___________________________
Type of Action 6
______________________________________
Type of Action 3
Remark 6:

3. Human Resources Director ___________________________ Effective Date
Required if effective date is past due.

6. Finance Director________________________

2. Human Resources Initial __________

1. Originator Signature __________ HQG _________
HQG
Packet Page 2769
Item  H. 1.

DATE 05/25/2023
TO Honorable Mayor and City Council Members
FROM David Benoun, City Manager
SUBJECT    Closed Session pursuant to Government Code Section 54957, Public Employee Performance Evaluation, Title: City Manager
Packet Page 2770

← All documents from this meeting