Cities Index.
09 - City Bridge Deck Maintenance Project — Award of Contract No. 7679-2 (21R13)

Newport Beach City Council
September 13, 2022

Document
09 - City Bridge Deck Maintenance Project — Award of Contract No. 7679-2 (21R13)
Meeting
September 13, 2022
Body
Newport Beach City Council
Pages
3
Text extracted from the city's file for reading and search. Open the original on ecms.newportbeachca.gov. That file is the official record.

Q SEW Pp�T

CITY OF
z NEWPORT BEACH
c�<,FORN'P City Council Staff Report
September 13, 2022
Agenda Item No. 9
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311, [email protected]
PREPARED BY: Tom Sandefur, P.E., Assistant City Engineer [email protected]
PHONE: 949-644-3321
TITLE: City Bridge Deck Maintenance Project — Award of Contract No. 7679-2 (21 R13)
ABSTRACT:

City of Newport Beach (City) staff received construction bids for the City Bridge Deck Maintenance Project and requests City Council approval to award the construction contract to Peterson -Chase General Engineering Construction, Inc. of Irvine, California (Peterson -Chase). The project performs deck maintenance work to bridges throughout the City consisting of sealing decks with high molecular weight methacrylate, installing deck joints, and striping.

RECOMMENDATION:
a) Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (c) (repair and maintenance of existing street with no expansion of use) of the CEQA Guidelines, because this project has no potential to have a significant effect on the environment;
b) Approve the project drawings and specifications;
c) Award Contract No. 7679-2 to Peterson -Chase General Engineering Construction, Inc. for the base bid price of $270,800, and authorize the Mayor and City Clerk to execute the contract; and
d) Establish a contingency of $40,620 (15 percent of total bid) to cover the cost of unforeseen work not included in the original contract.
9-1

City Bridge Deck Maintenance Project — Award of Contract No. 7679-2 (21 R13) September 13, 2022

Page 2 ends

DISCUSSION:

Caltrans and City staff conduct periodic inspections of City maintained bridges. Based on these inspections, a repair strategy is conceived to keep the bridges structurally sound and extend the useful life of each. One of the strategies for maintaining the concrete bridge decks is to seal the minor surface cracking to prevent water and corrosive deposits from entering the bridge deck and damaging the reinforcing steel. This project proposes to coat the decks of the Newport Island Bridge, the Jamboree Road Bridges, Bison Avenue Bridge, and Bonita Canyon Bridge. In addition, the asphalt laid over the bridge joints on Balboa Island Bridge has begun to crack due to the normal movement and flexing of the bridge. The proposed project will cut a series of joints into the asphalt to relieve the stress and protect the asphalt.

At 10 a.m. on August 3, 2022, the City Clerk opened and read the following bids for this project:
411919102-1

TOTAL BID AMOUNT
Low Peterson -Chase General Engineering, Inc. $ 270,800 2nd Beador Construction Company, Inc. $ 282,300
3rd Truesdell Corporation of California, Inc. $ 295,295 4th Applied Restoration, Inc. $ 455,500
The low bid amount is approximately 20 percent lower than the Engineer's Estimate of $335,500. This lower than anticipated cost is due to the lower cost proposed for the deck sealant.

The apparent low bidder, Peterson -Chase, Inc., possesses a California state contractor's license classification "A" as required by the project Special Provisions. The contractor is registered with the California Department of Industrial Relations as required by California law to work and bid on public contracts. A check of the contractor's references indicates satisfactory completion of similar projects for other local public agencies.

Pursuant to the contract documents, the contractor will have 30 consecutive working days to complete the project.

The project plans and specifications will be available for review at the September 13, 2022 City Council meeting or upon request.

FISCAL IMPACT:

The FY 2022-23 adopted Capital Improvement Program (CIP) budget includes sufficient funding for the award of this contract. Project funding will be expensed from the following account:
9-2

City Bridge Deck Maintenance Project — Award of Contract No. 7679-2 (21 R13) September 13, 2022

Page 3 ends

Account Description Account Number Amount
Gas Tax 12101-980000-21R13 $ 313,000
Proposed fund uses are as follows:
\/Pnrinr
Peterson -Chase, Inc.

Peterson -Chase, Inc.

Various
Total: $
Purpose
Construction Contract
Contingency
Incidentals, Printing
313,000
Amount
$
270,800
$
40,620
$
1,158
Total: $
312,578
Staff recommends establishing $40,620 (15 percent of total bid) for contingency purposes and unforeseen conditions associated with construction.

ENVIRONMENTAL REVIEW:

Staff recommends the City Council find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (c) (repair and maintenance of existing street with no expansion of use) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment.

NOTICING:

The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item).

ATTACHMENT:

Attachment A — Location Maps
9-3

ATTACHMENT A
a

BAYSIDE DR
� O
R
Z
_ m
m
LEGEND
Ll
BRIDGE
N07 TG SCALE

CITY BRIDGE DECK MAINTENANCE PROJECT

BALBOA ISLAND BRIDGE

LOCATION MAP

CITY OF NEWPORT BEACH

PUBLIC WORKS DEPARTMENT
C-7679-2 1 09/13/22

m,
J
� � SoN PEE
a
o LEGEND
G
BRIDGE

NOT TO SCALE

CITY BRIDGE DECK MAINTENANCE PROJECT CITY OF NEWPORT BEACH

BISON AVE BRIDGE PUBLIC WORKS DEPARTMENT
LOCATION MAP C-7679-2 09/13/22
9-5

O
o
® v a
o � �
Q
0 d
o
o �
o
a
r7 BO,yirg 0 � o
mr giyy0"o
o
R
z
d

FORD RD
LEGEND
d BRIDGE

NOT TO SCALE

CITY BRIDGE DECK MAINTENANCE PROJECT

BONITA CANYON BRIDGE

LOCATION MAP

CITY OF NEWPORT BEACH

PUBLIC WORKS DEPARTMENT
C-7679-2 1 09/13/22

CITY BRIDGE DECK MAINTENANCE PROJECT I CITY OF NEWPORT BEACH

JAMBOREE ROAD BRIDGE PUBLIC WORKS DEPARTMENT
LOCATION MAP I C-7679-2 1 09i1-3i22
9-7

N07 70 SCALr

CITY BRIDGE DECK MAINTENANCE PROJECT CITY OF NEWPORT BEACH 38TH STREET BRIDGE PUBLIC WORKS DEPARTMENT
LOCATION MAP I C-7679-2 1 09i1-3i22
ON

← All documents from this meeting