Cities Index.
11 - Balboa Branch Library / Fire Station No. 1 Concept Review and Approval — Project No. 23F12 - PowerPoint

Newport Beach City Council
May 14, 2024

Document
11 - Balboa Branch Library / Fire Station No. 1 Concept Review and Approval — Project No. 23F12 - PowerPoint
Meeting
May 14, 2024
Body
Newport Beach City Council
Pages
66
Text extracted from the city's file for reading and search. Open the original on ecms.newportbeachca.gov. That file is the official record.

May 14, 2024
Item No. 11
BALBOA LIBRARY / FIRE STATION #1

REPLACEMENT PROJECT
City Council Meeting
May 14, 2024
Item # 11

3ALBOA LIBRAH
_OCATION
Jim

CITY OF

NEWPORT BEACH
0 2

BALBOA LIBRARY / FIRE STATION 1

LOCATION
u
r
•t• ,

BALBOA LIBRARY
*Built 1929 - originally 566 SF
(comfort station predates the library)
• Expanded 1952 and 1962 to
~4,500 square feet. This
includes 360 SF of Museum
space
• Facility Condition Index: POOR
I,

CITY OF

NEWPORT BEACH
FIRE STATION 1
• Constructed 1962
• Currently 3,432 SF
• Staffed by 3 Fire Department
personnel
• Facility Condition Index: POOR
Total City Lot area-24,000 SF

• Review Site Trees Health for determination of viability to remain • Modern Fire Facility
• Modern Right -Sized Branch Library
- Well designed work and study areas
- Up to date technology, improved sight lines
- Neighborhood Scale Library
• Look to work in Neighborhood Recreation Component to Complement the Library (age -appropriate playground)
• Try to find/include Additional Public Parking
• Continue indoor and include Outdoor Library Programming Area • Improved access
• Possibly include some Public Works maintenance equipment/supplies storage
• Need to maintain the existing sewer easement

PROJECT TIMELINE
July 2022
Council
adopts
budget for
facility
replacement
January
2023
Design Team
contract
awarded to
COAR for
design
2023-2024
Departmental
and
subcommittee
meetings to
develop starter
concept design
framework base
on objectives
January 2024
Board of
Library
Trustees
Public Meeting
and
Community
Input on Initial
Concepts

PROJECT TIMELINE
March 5, 2024 May 14, 2024
PB&R
Commission
Public Meeting
and
Community
Input on Initial
Concepts
City Council
Public
Meeting for
Design
Concept
Approval
Summer 2025
Final Design and
Permitting
Complete.

Advertise Project
for Construction
Bids
(Estimated
Construction
Cost: $16 Million)
Fall 2025
Construction
Begins

Public Notification on Concept Development of Project
• Posted Agendas and Notices on Public Hearings on Project • City Pushed Social Media posts (Nextdoor, Facebook, Instagram) • PB&R and Council meeting notice to 1,000-foot radius
• Email list of interested parties
• HOA notifications
Opportunities for Public Input
• Library Board of Trustees Public Meeting
• Parks, Beaches, and Recreation Meeting
• City Council Meeting
• Contacting the City Council, Commissioner and City Staff Directly

DESIGN DEVELOPMENT

DESIGN DEVELOPM

DESIGN DEVELOPMENT
E Bay Ave -1B.ayVW i_.!- dray ve
n
E Bay Ave a

M
Three Proposed Layouts for Your Consideration
• Fire station: -5,100 SF (includes Fire Apparatus bays) • Neighborhood Branch Library: -3,600 SF
• Library Study Areas
• Outdoor Flexible Library Programming Space
• Age -Appropriate Playground Area
• PW Equipment Storage: - 900 SF
• Increased Public Parking by 13 to 14 spaces
- 13 -14 on -site parking spaces (increase of 5 - 6)
- -8 additional on -street spaces available due to improved layout

CITY OF

NEWPORT BEACH

Total Building square
9,850
SF
9,170
SF
10,025 SF
7,932 SF
footage
Library square footage
3,625
SF
3,620
SF
3,660 SF
4,140 SF
(used as library)
Museum square footage
0 SF
0 SF
0 SF
360 SF
Fire Station square footage
5,065
SF
5,250
SF
51140 SF
3,432 SF
Public Works Storage
885 SF
0 SF
935 SF
0 SF
Playground square footage
1,500
SF
1,500
SF
1,600 SF
0 SF
Landscaped square footage
2,830
SF
3,675
SF
35470 SF
65550 SF
Trees
16 16
13 11
On -site parking spaces
14 14
13 8
Additional street parking
8 9
8 n/a
spaces added

OFF -SITE PARKING
In
. = -, _V, I __ w
10 won
F
� lit
4 �

Cl*ty
_iNew ort
Beach
�ji�

AY UT OPTION 1
now
r:
i
.:
r.................
�!---�- � =�::IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
— jai ij
-- y
.................... Im.
:IIIIIIIII................ .......IIIIII
r
A r -lw . w W7 -""T-a

46 f
N
CONCER
• h. ' 6% 1 A
LAYOUT OPTION 1A
•M4 W,
I
f"
ri

CONCEPT LAYOU TION 1A

IkL
�tc
I
CONCEP
OtYOUT OPTION
_wooa�,-*-
gig_
I As
—low, % -Mir 1

Building Look and Theme
Cottage House Option
�►. .. .ter
is �; �'..:.. ..��' �_*'G-"'^ ...i.'-�— ,+t _ +•�a'�i••�.. . � fR:

All

I,

CITY OF

NEWPORT BEACH
23 Cottage House — View from East Bay Avenue

Cottage House — View from Island Avenue
...A% A
1' •� 1

Cottage House (lA)— View from Balboa Blvd.

Cottage House (1A) — View from East Bay Avenue
� 840_1..�
■11 ■� � � I i,il

10. Cottage House (1A) — View from Island Avenue

Building Look and Theme
Natural Modern Option
A
i

Natural Modern — View from Balboa Blvd.

Natural Modern — View from East Bay Avenue
It
lip.

J ff
� w
NEWPORT 6tRCK
-°�- .,--

Natural Modern —View from Parking Lot
I Nib.

Moog Na k. .

P=W UWW% �!;7 #-N ■
Me
Nor
Ore,

CITY OF

NEWPORT BEACH

Theme Examples: Early Literacy Elements
I, i

CITY OF

NEWPORT BEACH
34 CITY OF

NEWPORT BEACH

•� �j.12.11 ` • ,
V`-gyp _, *1 r • �y • , _ ;
_ .::;�, ± TF- •tit �. r .,i' � ,' r.
r r
r '^ ► 11
Fq4F *c 44
1 s'
f ,Air
4 EXISTING SITE TREES

- .`fir �"y' r .■ ..
mill
__...........................
r
r.• ____ _ _ _ _--- _i �..

A b MMMI�s

.�
j

16. -- �.7 - —;w-- -- I- " -..L.
i
mp
MR
■Ivim
L

1*
Current Site Trees and Conditions
February 2
PF

LO LEI LL LQ L-L
` MA A

Current Site Trees and Conditions
February
2024
i
J
'
MIN
_ I F ,'•

Prior Blue Gum Eucalyptus
• Tested Dec 2022 and August 2023
• During a 9-month period, the
detectable decay in Front 3 (ID#
351537) increased from 17% to 43%
• Front 3 (ID# 351537) was
presented to the PB&R Commission
on November 7, 2023 for
consideration for removal.
• Removed on December 7, 2023
I,

CITY OF

NEWPORT BEACH

Follow-up review
confirmed the rotten trunk
section identified by the
tomography was shown
on images.

Examination confirmed
tomography is a
sound/proven method in
diagnosing compromised
wood
I,

CITY OF

NEWPORT BEACH
43 0
I,

CITY OF

NEWPORT BEACH
0 Blue Gum (Front 46) (ID#3517580)
Examined Dec 2022 - Tomography showed 2% rot
Examined Aug 2023 - Tomography showed 7% rot
• During a 9-month period, detectable rot
has increased from 2% to 7%
• Decay will continue to increase
exponentially to the point where removal
is recommended (-V 5 years)
• High Risk Rating / Removal
Recommended = 30%+ damaged wood
Additionally, construction activities will
impact the health of the tree:

Compacted soil from Root Footprint of new Lack of consistent heavy equipment pruning building water & nutrients

Canary Island Date Palm (Front
41)(ID# 3517575)
• Existing Fusarium infection will
likely weaken the palm, whereby a
secondary infection will complete
the palm's decline (3-5 years)
• Additionally, construction activities
will impact the health of the tree
Compacted soil from Root Footprint of
heavy equipment pruning new building
I,

CITY OF

NEWPORT BEACH

Herons are
Opportunistic Nesters
Many other
opportunities for
habitat throughout and
around Newport Bay
Large home/breeding
range (5-30 miles)
Other local habitats
underutilized

CITY OF

NEWPORT BEACH
46 • January 2024 — Board of Library Trustees held a public meeting.

Trustees expressed support for Option 1 and the cottage style. • PBR Commission held a public meeting to review the proposed layouts, recreation components, and the request to remove 2 landmark trees
• The Commission voted to authorize the removal of the two diseased trees outside of nesting season (no sooner than September 2025) and with a report back to the Commission regarding the health of the tree.

Continue to refine the concept plans, elevations, and recreational components.
• The Commission also expressed a preference for Layout 1 and the Cottage House theme
4di

CITY OF

NEWPORT BEACH

elf approved tonight, Staff will begin final design work • Final plans and permitting ready for bid Summer 2025
• Construction begins Fall 2025
*Estimated construction cost is $16,000,000 (—$11600/SF) • AI I-i n cost estimated at $17,700,000
(includes design, construction support, other soft costs) • Cost of temporary Fire Station not included and still to be determined
J,

CITY OF

NEWPORT BEACH
48 1) Review, take
in public
input, and approve
the
preferred Conceptual
Design
Floor
Plan
and
Architectural
Style
for
the
building;
2) Find this project exempt from the California Environmental Quality Act because this project has no potential to have a significant effect on the environment; and
3) Direct Staff to proceed with preparation of final building and site plans, required permits, and solicit public bids for its construction I,

CITY OF

NEWPORT BEACH
49 BALBOA LIBRARY / FIRE STATION #1

REPLACEMENT PROJECT
Conclusion of Presentation

a AT E)
_s
In 2005, there were 3,889 public trees...

In 2024, there are 4,573 public trees...

Also many more Private Trees now than 1947
Balboa Blvd (Magnolias,
Palms & Firewheels)
Newport Blvd
(Strawberry Trees, Chinese Elms)
I,

CITY OF

NEWPORT BEACH
• Many more Public Trees were added
to the Peninsula via City Construction
Project and area reconstruction
• City requirements to plant during
private property developments
Marina Park
(Palms, Coral Trees, Chinese Elms, Catalina Ironwood,
Torrey Pines, New Zealand Christmas Trees, etc.)

■

BACKGROUND
lox 40t
Ai
�l-
Ott � �

• Avoid overarching theme
• Include understated reading/book features
• Encourage learning opportunities in a playful environment • Integrate early literacy practices: Read, Talk, Sing, Write, Play - Alphabet and numbers
- Interactive learning and sensory elements, such as different textures and braille
- Musical elements that encourage collaboration, rhythm recognition and the development of fine motor skills
- Tracing panels or finger mazes
I, i

CITY OF

NEWPORT BEACH
53 • Designate areas for storytelling and reading
- Benches or small stools
- Mini amphitheater -like area to gather for storytime
• Open area for program such as:
- Sensory play
- Scavenger hunts
- Touch tanks
- Bubble shows
ji,

CITY OF

NEWPORT BEACH

Playground Considerations
• Theme — understated; literary and early literacy elements • Feature — program space
• Layout — open, low, and compact
• Color — subtle
• Material — unitary
I,

CITY OF

NEWPORT BEACH
55 Canary Island Date Palms
(ID# 3517577) (Front 43)
(ID# 3517578) (Front 44)
Declined from an infection of
Fusarium and a Secondary
Pathogen
Palms usually decline very
quickly (-60 days)
I,

CITY OF

NEWPORT BEACH
July 6, 2023
Front 44
Front 43
March 18, 2020
Reported to PB&R on June 2,
2020 & August 8, 2023

• During a one-year period, the
detectable decay in Front 45 (ID#
3517579) increased from 33% to
47%
• On February 7, 2022, Front 45 (ID#
3517579) was presented to the
PB&R Commission for
consideration for removal.
• After approval by PB&R, removal
was delayed due to migratory bird
activity.
• Removed on September 5, 2023
I, i

CITY OF

NEWPORT BEACH

i.

NINSULA'S URBAN FOREST (UPDATE)
;• .
dw
_�1 ��. "��' �i ice' ••' ��r r'�
'lk.
-dow
{ f I-
Ok
dn
• ._
a:T -
4 M1 � i5 ,•y r
• } �[ � t � � f � { _• - ,ice � � . -,

• Clear sightlines to front of library
- Open Structures
- Low, undulated perimeter
• Avoid equipment that requires a large safety fall zone • Primary age of library program participants 0-3; secondary age of participants 4-6
I,

CITY OF

NEWPORT BEACH
60 Layout Examples: Open &Low
I,

CITY OF

NEWPORT BEACH
61 Layout Examples: Low Perimeter
I,

CITY OF

NEWPORT BEACH

• Preference for neutral or single -color variations
• Preference for unitary materials
- Rubber tiles
- Pour -in -place
I,

CITY OF

NEWPORT BEACH
63 "
OFT
INO "I
At!%

FEATURE EXAMPLES: READING AREAS
I,

CITY OF

NEWPORT BEACH
65 w(m,ft
To
I,

CITY OF

NEWPORT BEACH

← All documents from this meeting