Attachment C
Project Plans
17-65
BIOGAS
ENGINEERING
TITLE SHEET
TS
DETAIL CROSS REFERENCING CONVENTION
PROJECT INFORMATION LOCATION MAP VICINITY MAP
N
S
N
S
20662 NEWPORT COAST DRIVE
NEWPORT BEACH, CA 92657
ARCHAEA ENERGY
COYOTE CANYON LANDFILL RNG PROJECT
ASSESSOR PARCEL NUMBER
TOTAL DISTURBED AREA
BENCHMARK
BUILDING SQUARE FOOTAGEOCCUPANCY CATEGORY
CONSTRUCTION TYPE
OCCUPANCY LOAD MAX.
17-66
BIOGAS
ENGINEERING
GENERAL INDEX SHEET
G0.01
GENERAL INDEX SHEET
20662 NEWPORT COAST DRIVE
NEWPORT BEACH, CA 92657
ARCHAEA ENERGY
COYOTE CANYON LANDFILL RNG PROJECT
17-67
E U
U
U
U
U
U 3"
CC
BIOGAS
ENGINEERING
SITE PLAN
G2.00
LEGENDS
17-68
E U
U
U
U
U
U 3"
CC
EXCLUSIVE
PROJECT
LEASE
BIOGAS
ENGINEERING
RIGHT-OF-WAYS/RESTRICTIONS
G2.01
17-69
E U
U
U
U
U
U 3"
CC
BIOGAS
ENGINEERING
UTILITIES PLAN
G2.02
LEGENDS NOTE:-
17-70
BIOGAS
ENGINEERING
LEASE AREA LEGAL DESCRIPTION & PLAT
G2.03
ARCHAEA ENERGY
COYOTE CANYON LANDFILL RNG PROJECT
17-71
BIOGAS
ENGINEERING
TOPOGRAPHIC SURVEY (SH 1 OF 3)
G2.04
ARCHAEA ENERGY
COYOTE CANYON LANDFILL RNG PROJECT
17-72
BIOGAS
ENGINEERING
TOPOGRAPHIC SURVEY (SH 2 OF 3)
G2.05
ARCHAEA ENERGY
COYOTE CANYON LANDFILL RNG PROJECT
17-73
BIOGAS
ENGINEERING
TOPOGRAPHIC SURVEY (SH 3 OF 3)
G2.06
ARCHAEA ENERGY
COYOTE CANYON LANDFILL RNG PROJECT
17-74
E U
U
U
U
U
U 3"
CC
BIOGAS
ENGINEERING
AREA CLASSIFICATION FOR RNG
(SCG NOT INCLUDED)
G3.01
LEGENDS
TYPICAL FOR ALL HYDROCARBON (RAW BIOGAS/METHANE)
THREADED OR FLANGED PIPE FITTINGS
NOTE:-
17-75
U
U
U 3"
CC
BIOGAS
ENGINEERING
DEMOLITION PLAN
G3.02
LEGENDS
NOTE:-
17-76
BIOGAS
ENGINEERING
G4.01
SOUTH ELEVATION
PLANT ELEVATION VIEW
SOUTH ELEVATION - LOOKING PLAN NORTH
SOUTH ELEVATION
17-77
BIOGAS
ENGINEERING
G4.02
PLANT ELEVATION VIEW
NORTH ELEVATION - LOOKING PLAN SOUTH
NORTH ELEVATION
NORTH ELEVATION
17-78
BIOGAS
ENGINEERING
PLANT ELEVATION VIEW
EAST ELEVATION - LOOKING PLAN WEST
G4.03
EAST ELEVATION
EAST ELEVATION
17-79
BIOGAS
ENGINEERING
G4.04
WEST ELEVATION
PLANT ELEVATION VIEW
WEST ELEVATION - LOOKING PLAN EAST
WEST ELEVATION
17-80
BIOGAS
ENGINEERING
SoCalGas POINT OF RECEIPT
P&ID - LEGEND & PRESSURE BLOCK
G5.01
ARCHAEA ENERGY
COYOTE CANYON LANDFILL RNG PROJECT
17-81
BIOGAS
ENGINEERING
SoCalGas POINT OF RECEIPT
P&ID - ODORIZER SYSTEM
G5.02
ARCHAEA ENERGY
COYOTE CANYON LANDFILL RNG PROJECT
17-82
BIOGAS
ENGINEERING
SoCalGas POINT OF RECEIPT
SITE PLAN
G5.03
ARCHAEA ENERGY
COYOTE CANYON LANDFILL RNG PROJECT
17-83
BIOGAS
ENGINEERING
SoCalGas POINT OF RECEIPT
PLOT PLAN
G5.04
ARCHAEA ENERGY
COYOTE CANYON LANDFILL RNG PROJECT
NOTES:
1. ALL DIMENSIONS AND ELEVATIONS ARE IN FEET AND INCHES.
ISSUED FOR 60% REVIEW
0 5' 10'
SCALE: 3/16" = 1'-0"
PLANT
N
PLOT PLAN
TRUE
POINT OF RECEIPT
BIOME RULE 45 - COYOTE CANYON
PLOT PLAN
34250-3002-D-PIP C
20662 NEWPORT COAST DR. NEWPORT BEACH
REV
NUMBERDWG DIST: DRAWING
SCALE:
DWG CLASS:
DATE
WOA WOA:
ENG FILE NO:
SCG ENG APV:
BY
PROJ APV:
CHECKED:
DRAWN:
DESIGNED:
DATE DRAWN CHECKEDPRJ APV SCG APV ENG FILE NO DESCRIPTION 303
3/16" = 1'-0"
* 09,39
89395.000
09/23/21
09/23/21
09/20/21
S. LY
P. DISOMMA
B. KIKAWA
G. CASILLAS
G. CASILLAS 09/20/21
REV
A 09/23/21
GKC BDK PD SQL * ISSUED FOR 10% REVIEW 89395.000
B 10/15/21 GKC BDK PD SQL * ISSUED FOR 30% REVIEW 89395.000 C 05/27/22 GKC CJT PD SQL - ISSUED FOR 60% REVIEW 89395.000 6'-0" 3'-6" 75'-6" 15'-0"
29'-6"
15'-0"
SLIDING GATE
6"
15'-0"
60'-0"
10' x 8'
ELECTRICAL
SHELTER
12' x 8'
ANALYZER
SHELTER
INST.
CABINET
INST.
CABINET
YZ ODORIZER
2'-6"
7'-0"
12'-7 5/16"
PCV
0102
PCV
0101
FE
0101
OPP
0100
100'-0"
V-100
FILTER SEPARATOR
5'-7 1/4" 76'-0 3/8"
4"
4" 3"
3"
3"
3" 3"
3"
3"3"
3"
3"
LIGHT POLE
23'-11 1/2" 19'-6" 7'-10 1/2"
320
1" CUSTOMER TAP
PS-1A/B
PS-2A/B
PS-5
PS-4 PS-3
PS-6
PS-7
PS-8
PS-10
1 PS-9
WOA : XXXXX WOA : 89395.000
NEW
89395.000
3 89395.000
EXISTING
FROM BIOFUELS NB
NEW
WOA : 89395.000
2 89395.000
TO #21027848
C C
17-84
E U
U
U
U
U
U
BIOGAS
ENGINEERING
EXISTING PIPES & CABLES
(FOR UG SERVICES SURVEY)
G6.00
LEGENDS NOTE:-
17-85
E U
U
U
U
U
U 3"
CC
BIOGAS
ENGINEERING
FIRE MASTER PLAN
G6.01
LEGENDS
NOTE:-
17-86