Cities Index.
Agenda

Norco City Council
March 2, 2022

Document
Agenda
Meeting
March 2, 2022
Body
Norco City Council
Pages
314
Original file
14.9 MB
Text extracted from the city's file for reading and search. Open the original on norco.civicweb.net. That file is the official record.

CA-23

GENERAL LIABILITY ENDORSEMENT

CITY OF NORCO
2870 Clark Avenue
Norco, CA 92860
(951) 270-5678
A. POLICY INFORMATION Endorsement # ________________________

1. Insurance Company ____________________________________________ Policy Number _____________________

2. Policy Term (From) _______________ (To)________________ Endorsement Effective Date ______________________________________

3. Named Insured _______________________________________________

4. Address of Named Insured
_____________________________________________________________ _____________________________________________________________

5. Limit of Liability Any One Occurrence/Aggregate
$______________________________ /_____________________________

6. Deductible or Self-Insured Retention (Nil unless otherwise specified):
______________________________________________

7. Coverage is equivalent to:

Comprehensive General Liability Form GL0002 (Ed. 1/73)
______________________________________________
Commercial General Liability “Occurrence” Form CG0001
______________________________________________

8. Bodily Injury and Property Damage Coverage is:
____________________________________”occurrence”
Note: The City of Norco standard insurance requirements specify “occurrence” coverage. “Claims-made” coverage is not acceptable. If commercial general liability form or equivalent is used, the general aggregate must apply separately to this location/project or the general aggregate must be twice the occurrence limit.

Page 174 of 314 ends

CA-24

9. Description of Project:

HILLSIDE AVENUE RECONSTRUCTION PROJECT (FIRST STREET TO SECOND

STREET)
The general items of work to be done hereunder consist of:

The general items of work to be done hereunder consist of roadway widening, pavement reconstruction, curb and gutter, rolled curb, striping and other improvements on Hillside Avenue from First Street to Second Street to the satisfaction and acceptance of the City Engineer.

B. POLICY AMENDMENTS
This endorsement is issued in consideration of the policy premium. Notwithstanding any inconsistent statement in the policy to which this endorsement is attached or any other endorsement attached thereto, it is agreed as follows:

1. INSURED. As respects any work performed on the above described Project, the City of Norco, its elected or appointed officers, officials, employees, consulting engineers, and volunteers are included as insured with regard to damages and defense of claims arising from: (a) activities performed by or on behalf of the Named Insured, (b) products and completed operations of the Named Insured, or (c) premises owned, leased, or used by the Named Insured.

2. CONTRIBUTION NOT REQUIRED. As respects: (a) work performed by the Named Insured on the above described Project for or on behalf of the City of Norco; or (b) products sold by the Named Insured to the City of Norco for use on the Project; or (c) premises leased by the Named Insured from the City of Norco, the insurance afforded by this policy shall be primary insurance as respects the City of Norco, its elected or appointed officers, officials, employees, consulting engineers, or volunteers; or stand in an unbroken chain of coverage excess of the Named Insured’s schedule underlying primary coverage. In either event, any other insurance maintained by the City of Norco, its elected or appointed officers, officials, employees, consulting engineers, or volunteers shall be in excess of this insurance and shall not contribute with it.

3. SCOPE OF COVERAGE. This policy, if primary, affords coverage at least as broad as:
(1) Insurance Services Office Form Number GL 0002 (Ed. 1/73), Comprehensive General Liability Insurance and Insurance Services Office form number GL 0404 Broad Form Comprehensive General Liability endorsement; or
(2) Insurance Services Office Commercial General Liability Coverage,

Page 175 of 314 ends

CA-25
“Occurrence” Form CG 0001; or
(3) If excess, affords coverage which is at least as broad as the primary insurance forms referenced in the preceding Sections (1) and (2).

4. SEVERABILITY OF INTEREST. The insurance afforded by this policy applies separately to each insured who is seeking coverage or against whom a claim is made or a suit is brought, except with respects to the Company’s limit of liability.

5. PROVISIONS REGARDING THE INSURED’S DUTIES AFTER ACCIDENT OR LOSS. Any failure to comply with reporting provisions of the policy shall not affect coverage provided to the City of Norco, its elected or appointed officer, officials, employees, consulting engineers or volunteers.

6. CANCELLATION NOTICE. The insurance afforded by this policy shall not be suspended, voided, canceled, reduced in coverage or in limits except after 30 days prior written notice by certified mail return receipt requested has been given to the City of Norco. Such notice shall be addressed as shown in the heading of this endorsement.

C. INCIDENT AND CLAIM REPORTING PROCEDURE
Incidents and claims are to be reported to the insurer at:

ATTN:
_____________________________________________________________________ (Title) (Department)
_____________________________________________________________________ (Company)
_____________________________________________________________________ (Street Address)
_____________________________________________________________________ (City) (State) (Zip Code)
______________________________
(Telephone Number)

Page 176 of 314 ends

CA-26
D. SIGNATURE OF INSURER OR AUTHORIZED REPRESENTATIVE OF THE

INSURER
I, __________________________, warrant that I have authority to (Print/Type Name)
bind the below-listed insurance company and by my signature hereon do so bind this company.
____________________________________________

SIGNATURE OF AUTHORIZED REPRESENTATIVE
(Original Signature required on endorsement furnished to the City of Norco) ORGANIZATION: _____________________________________________________ TITLE: _____________________________________________________ ADDRESS: _____________________________________________________ _____________________________________________________
TELEPHONE: _____________________________________________________

Page 177 of 314 ends

CA-27

AUTOMOBILE LIABILITY ENDORSEMENT

CITY OF NORCO
2870 Clark Avenue
Norco, CA 92860
(951) 270-5678
A. POLICY INFORMATION Endorsement #_____________________

1. Insurance Company _____________________________________________ Policy Number _____________________

2. Policy Term (From)________________(To) _______________ Endorsement Effective Date ___________

3. Named Insured________________________________________________

4. Address of Named Insured________________________________________

5. Limit of Liability Any One Occurrence/Aggregate
$______________________ /_____________________________________

6. Deductible or Self-Insured Retention
(Nil unless otherwise specified):
$____________________________________________________________ B. POLICY AMENDMENTS
This endorsement is issued in consideration of the policy premium. Notwithstanding any inconsistent statement in the policy to which this endorsement is attached or any other endorsement attached thereto, it is agreed as follows:

1. INSURED. The City of Norco, its elected or appointed officers, officials, consulting engineers, employees and volunteers are included as insured with regard to damages and defense of claims arising from: the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by the Named Insured, regardless of whether liability is attributable to the Named Insured or a combination of the Named Insured and the City of Norco, its elected or appointed officers, officials, employees, consulting engineers or volunteers.

2. CONTRIBUTION NOT REQUIRED. As respects work performed by the Named Insured for or on behalf of the City of Norco, the insurance afforded by this

Page 178 of 314 ends

CA-28
policy shall: (a) be primary insurance as respects the City of Norco, its elected or appointed officers, officials, employees, consulting engineers or volunteers; or (b) stand in an unbroken chain of coverage excess of the Named Insured’s primary coverage. In either event, any other insurance maintained by the City of Norco, its elected or appointed officers, officials, employees or volunteers shall be in excess of this insurance and shall not contribute with it.

3. SCOPE OF COVERAGE. This policy, if primary, affords coverage to the Named Insured at least as broad as:
(1) Insurance Services Office form number CA 00001 (Ed. 1/78), Code 1 (“any auto”) and endorsement CA 0025.
(2) If excess, affords coverage which is at least as broad as the primary insurance forms referenced in the preceding Section (1).

4. SEVERABILITY OF INTEREST. The insurance afforded by this policy applies separately to each insured who is seeking coverage, or against whom a claim is made or a suit is brought, except with respect to the Company’s limit of liability.

5. PROVISIONS REGARDING THE INSURED’S DUTIES AFTER ACCIDENT OR LOSS. Any failure to comply with reporting provisions of the policy shall not affect coverage provided to the City of Norco, its elected or appointed officer, officials, employees, consulting engineers or volunteers.

6. CANCELLATION NOTICE. The insurance afforded by this policy shall not be suspended, voided, canceled, reduced in coverage or in limits except after 30 days prior written notice by certified mail return receipt requested has been given to the City of Norco. Such notice shall be addressed as shown in the heading of this endorsement.

Page 179 of 314 ends

CA-29
C. INCIDENT AND CLAIM REPORTING PROCEDURE
Incidents and claims are to be reported to the insurer at:

ATTN:
_____________________________________________________________________ (Title) (Department)
_____________________________________________________________________ (Company)
_____________________________________________________________________ (Street Address)
_____________________________________________________________________ (City) (State) (Zip Code)
____________________________________________________
(Telephone Number)
D. SIGNATURE OF INSURER OR AUTHORIZED REPRESENTATIVE OF THE

INSURER
I, __________________________, warrant that I have authority to (Print/Type Name)
bind the below-listed insurance company and by my signature hereon do so bind this company.
____________________________________________

SIGNATURE OF AUTHORIZED REPRESENTATIVE
(Original Signature required on endorsement furnished to the City of Norco) ORGANIZATION: _____________________________________________________ TITLE: _____________________________________________________ ADDRESS: _____________________________________________________ _____________________________________________________
TELEPHONE: _____________________________________

Page 180 of 314 ends

CA-30
WORKER’S COMPENSATION/EMPLOYER’S LIABILITY ENDORSEMENT

CITY OF NORCO
2870 Clark Avenue
Norco, CA 92860
(951) 270-5678
A. POLICY INFORMATION Endorsement # ________________________

1. Insurance Company ____________________________________________ (“the Company”)
Policy Number _________________________________________________

2. Effective Date of this Endorsement ________________________________

3. Named Insured_________________________________________________

4. Employer’s Liability Limit (Coverage B)______________________________ _____________________________________________________________ B. POLICY AMENDMENTS
In consideration of the policy premium and notwithstanding any inconsistent statement in the policy to which this endorsement is attached or any other endorsement attached thereto, it is agreed as follows:
(1) Cancellation Notice. The insurance afforded by this policy shall not be suspended, voided, canceled, reduced in coverage or in limits except after 30 days prior written notice by certified mail return receipt requested has been given to the City of Norco. Such notice shall be addressed as shown in the heading of this endorsement.
(2) Waiver of Subrogation. The Insurance Company agrees to waive all rights of subrogation against the City of Norco, its elected or appointed officers, officials, agents and employees for losses paid under the terms of this policy which arise from work performed by the Named Insured for the City of Norco.

Page 181 of 314 ends

CA-31
C. SIGNATURE OF INSURER OR AUTHORIZED REPRESENTATIVE OF THE

INSURER
I, _______________________, warrant that I have authority to bind (Print/Type Name)
the below-listed insurance company and by my signature hereon do so bind this company.

SIGNATURE OF AUTHORIZED REPRESENTATIVE
(Original signature required on endorsement furnished to the City of Norco) ORGANIZATION: ____________________________________________________ TITLE: ____________________________________________________ ADDRESS: ____________________________________________________ TELEPHONE: ____________________________________________________

Page 182 of 314 ends

CA-32

Page 183 of 314 ends

CA-33

Page 184 of 314 ends

CA-34

Page 185 of 314 ends

CA-35

Page 186 of 314 ends
Page 187 of 314 ends

City Council

STAFF REPORT
Date: March 2, 2022 Agenda Item:

2.F.

To: Honorable Mayor and City Council Members
Prepared By: Dana Roa, City Clerk
Department: City Clerk
SUBJECT:

Resolution Opposing Initiative 21-0042A1
RECOMMENDATION:

Adopt Resolution 2022-15 to oppose Initiative 21-0042A1, a deceptive, corporatesponsored proposition aimed for the November 2022 statewide ballot that would significantly jeopardize cities’ ability to provide essential services and infrastructure for our residents.

SUMMARY:

The measure limits the voters’ input, adopts new and stricter rules for raising taxes and fees, and makes it more difficult to hold state and local law violators accountable.

BACKGROUND:

An association representing California’s wealthiest corporations — including oil, insurance, banks and drug companies — is behind a deceptive proposition aimed for the November 2022 statewide ballot. Their measure would create major new loopholes that allow corporations to avoid paying their fair share for the impacts they have on our communities; while also allowing corporations to evade enforcement when they violate environmental, health, safety and other state and local laws.

A broad coalition of local governments, labor and public safety leaders, infrastructure advocates, and businesses oppose the Corporate Loophole Scheme for the following reasons:

Gives Wealthy Corporations a Major Loophole to Avoid Paying their Fair Share - Forcing Local Residents and Taxpayers to Pay More
• The measure creates new constitutional loopholes that allow corporations to pay far less than their fair share for the impacts they have on our communities, including local infrastructure, our environment, water quality, air quality, and

Page 188 of 314 ends

natural resources – shifting the burden and making individual taxpayers pay more.

Allows Corporations to Dodge Enforcement When They Violate Environmental, Health, Public Safety and Other Laws
• The deceptive scheme creates new loopholes that makes it much more difficult for state and local regulators to issue fines and levies on corporations that violate laws intended to protect our environment, public health and safety, and our neighborhoods.

Jeopardizes Vital Local and State Services
• This far-reaching measure puts at risk billions of dollars currently dedicated to critical state and local services.
• It could force cuts to public schools, fire and emergency response, law enforcement, public health, parks, libraries, affordable housing, services to support homeless residents, mental health services and more. • It would also reduce funding for critical infrastructure like streets and roads, public transportation, drinking water, new schools, sanitation, utilities and more.

Opens the Door for Frivolous Lawsuits, Bureaucracy and Red Tape that Will Cost Taxpayers and Hurt Our Communities
• The measure will encourage frivolous lawsuits, bureaucracy and red tape that will cost local taxpayers millions — while significantly delaying and stopping investments in infrastructure and vital services.

FISCAL IMPACT:

None.

RELATIONSHIP TO STRATEGIC PLAN:

This item is consistent with Strategic Direction #3: Economic Development and Financial Stability.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Lisette Free, Finance Director Approved by: Andy Okoro, City Manager
Approved as to Form: John Harper, City Attorney
ATTACHMENT(S):

Resolution No. 2022-15

Page 189 of 314 ends

RESOLUTION NO. 2022-15

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
NORCO, CALIFORNIA, TO OPPOSE INITIATIVE 21-0042A1
WHEREAS, an association representing California’s wealthiest corporations is behind a deceptive proposition aimed for the November 2022 statewide ballot; and WHEREAS, the measure creates new constitutional loopholes that allow corporations to pay far less than their fair share for the impacts they have on our communities, including local infrastructure, our environment, water quality, air quality, and natural resources; and
WHEREAS, the measure includes undemocratic provisions that would make it more difficult for local voters to pass measures needed to fund local services and infrastructure, and would limit voter input by prohibiting local advisory measures where voters provide direction on how they want their local tax dollars spent; and WHEREAS, the measure makes it much more difficult for state and local regulators to issue fines and levies on corporations that violate laws intended to protect our environment, public health and safety, and our neighborhoods; and WHEREAS, the measure puts billions of dollars currently dedicated to state and local services at risk, and could force cuts to public schools, fire and emergency response, law enforcement, public health, parks, libraries, affordable housing, services to support homeless residents, mental health services, and more; and WHEREAS, the measure would also reduce funding for critical infrastructure like streets and roads, public transportation, drinking water, new schools, sanitation, and utilities.

NOW, THEREFORE, BE IT RESOLVED, the City Council of the City of Norco, California, opposes Initiative 21-0042A1.

THEREFORE, BE IT FURTHER RESOLVED, that the City of Norco will join the NO on Initiative 21-0042A1 coalition, a growing coalition of public safety, labor, local government, infrastructure advocates, and other organizations throughout the state.

We direct staff to email a copy of this adopted resolution to the League of California Cities at [email protected].

Page 190 of 314 ends

Resolution No. 2022-15 – Oppose Initiative 21-0042A1

Page 2 ends

March 2, 2022
PASSED AND ADOPTED by the City Council of the City of Norco, California, at a regular meeting held on March 2, 2022.
_______________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
________________________
Dana Roa, CMC, City Clerk
City of Norco, California
I, DANA ROA, CMC, City Clerk of the City of Norco, California do hereby certify that the foregoing Resolution was introduced and adopted by the City Council of the City of Norco, California, at a regular meeting thereof held on March 2, 2022 by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Norco, California on March 2, 2022. ________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 191 of 314 ends

City Council

STAFF REPORT
Date: March 2, 2022 Agenda Item:

2.G.

To: Honorable Mayor and City Council Members
Prepared By: Alma Robles, Planning Director
Department: Planning
SUBJECT:

Local Early Action Planning (LEAP) Grant Program Award from the State Department of Housing and Community Development
RECOMMENDATION:

Adopt Resolution No. 2022-16, authorizing the City Manager to sign the Local Early Action Planning (LEAP) grant award provided by the State Department of Housing and Community Development for funding authorized by the Senate Bill 2 Planning Grant Program to accelerate housing production.

Recommend that the City Council authorize the City Manager execute the award contract and accept the LEAP grant award.

SUMMARY:

The attached Resolution is required by the State as part of a LEAP Grant Program award acceptance. The LEAP provides over-the-counter grants complemented with technical assistance to local governments for the preparation and adoption of planning documents and process improvements that 1) accelerate housing production and 2) facilitate compliance with implementation of the 2021-2029, 6th Cycle Regional Housing Needs Assessment (RHNA).

BACKGROUND:

Increasing the availability of affordable homes statewide is critical to bettering the quality of life of all Californians and to ending homelessness. In the 2019-2020 Budget Act, Governor Gavin Newsom allocated $250 million for all regions, cities, and counties to do their part by prioritizing planning activities that accelerate housing production to meet identified needs of every community. With this allocation, HCD established the Local Early Action Planning Grant Program (LEAP) with $119 million for cities and counties. LEAP provides one-time grant funding to cities and counties to update their planning documents and process improvements that will facilitate the acceleration of housing production and facilitate compliance to implement the sixth cycle RHNA targets.

Page 192 of 314 ends

The City Council authorized City Staff to apply for this award in February 2021 followed up by submittal of all application materials and supporting documents to the State in March. Staff received notification that the City had been awarded the LEAP grant on September 24, 2021 in the amount of $149,500. This grant is representative of the staff's commitment to utilizing available resources that lessen the burden on the General Fund.

The City of Norco’s funding request includes:
• Prepare a comprehensive update to the Zoning Ordinance (Section 18 of the Norco Municipal Code)
• Prepare an Inclusionary Housing Ordinance
• Creation of Objective Development Standards for compliance with SB 35 • Various Updates to the Zoning Ordinance to be consistent with the 2021-2029 Housing Element update
FISCAL IMPACT:

The Grant provides $149,500 to the City of Norco specifically dedicated to the various State requirements regarding the Housing crisis needs. The grant money will offset City costs affiliated with completed requirements outlined in the 2021-2029 Housing Element update with no matching fund requirement.

RELATIONSHIP TO STRATEGIC PLAN:

The LEAP grant is consistent with Strategic Direction #3 - Economic Development and Financial Stability: "Assure financial stability by expanding development efforts, diversifying revenue sources and continuing prudent financial management" by securing funds to help pay for services that the City would otherwise have to provide on its own.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Lisette Free, Finance Director Approved by: Andy Okoro, City Manager
Approved as to Form: John Harper, City Attorney
ATTACHMENT(S):

LEAP Approval Letter
LEAP Contract
Resolution No. 2022-16

Page 193 of 314 ends

www.hcd.ca. ov
.

DEPARTMENTOF HOUSING AND COMMUNITYDEVELOPMENT

DIVISIONOF HOUSING POLICY DEVELOPMENT
2020 W. El Camino Avenue, Suite 500
Sacramento.CA 95833
(916) 263-2911 I FAX (916) 263-7453
September 24, 2021
Andy Okoro
City Manager
City of Norco
2870 Clark Avenue
Dear Andy Okoro:

The CaliforniaDepartment of Housing and Community Development (Department) is pleased to announce that the City of Norco has been approved for funding under the Local Early Action Planning Grants Program (LEAP Program). The Department has determined that the application submitted in response to the Notice of Funding Availability released on January 27, 2020, meets LEAP Program requirements. This letter constitutes a conditional commitment of an award in the amount of $149,500.

The LEAP Program re?ects the state’s commitment to work in partnership with local governments to address California's critical housing needs. Local governments are using the grant awards for the preparation and adoption of planning documents, process improvements that accelerate housing production, and to facilitate compliance in implementing the sixth cycle of the regional housing need assessment (RHNA).

Congratulations on your successful application. Staff willbe contacting you shortly to initiate the process of the Standard Agreement for fund distribution. For further information, please contact Colin Cross, of our staff, at (916) 820-1275 or at

RECEIVED

CITYOF NCEC
C
SEP2 7‘-221

CITYCLERK
Sincerely,
Gustavo Velasquez
Director
co|in.cross hcd.ca. ov
RE: 2020 Local Early Action Planning (LEAP) Grants Program Award Norco, CA 92860

Page 194 of 314 ends

DEPARTMENT OF HOUSING AND COMMUNITYDEVELOPMENT

ADMINISTRATIONAND MANAGEMENTDIVISION
Business and Contract Services Branch
2020 W. El Camino Avenue, Suite 130, 95833
P. O. Box 952054
Sacramento, CA 94252-2054
(916) 263-6928/ FAX (916) 263-6917
February 11, 2022
Andy Okoro, City Manager
City of Norco
2870 Clark Avenue
Norco, CA 92860
Dear Andy Okoro:

RE: City of Norco
Contract No. 21-LEAP-16911
Congratulations on your 2019 Local Early Action Planning (LEAP) award. Attached is an electronic copy of the Standard Agreement with Exhibits A through D‘ A. Standard A reement STD 213 and Exhibits A throu h D
STD 213 - Cover page
Exhibit A - Authority, Purpose and Scope of Work
Exhibit B — Budget Detail and Payment Provisions
Exhibit C - State of California General Terms and Conditions — GTC - O4/2017 Exhibit C is now incorporated by reference; please see the STD 213 for additional information.

Exhibit D — LEAP Terms and Conditions
For ex editious handlin of the contract lease adhere to the followin

1. Review the entire Agreement thoroughly and, if necessary, discuss the requirements with vour legal and ?nancial advisors.

2. The person or persons authorized by the Reso|ution(s), must provide an original signature, printed name, title and date, on the lower left-hand section entitled "Contractor" on the STD 213 and/or on page 2 of the STD 213, if applicable.

The De artment now offers two 0 tions for returnin si ned STD 213' lease review and com lete one of the followin o tions:

3. 0 tion One: For electronic signature processing, reply to this Standard Agreement email noti?cation with the attached, fully signed STD 213 page. www.hcd.ca. ov
%V|

Page 195 of 314 ends

uuuu an
City of Norco
21-LEAP-16911

Page 2 of 2 ends

Allsigners must be included inthe reply emailand confirm acceptance of esigning the Agreement. 4 0 tion Two: Print one copy of the Standard Agreement, STD 213. Do not send photocopies of the signed STD 213 page. The hardcopy must be an original, wet signature; do not return the Exhibitsto HCD.

5. 5193:Ifthe resolution did not authorize a designated official to sign the STD 213 and amendments thereto, your governing body [?t adopt a resolution authorizing a designated officia|(s) to sign the STD 213 and any subsequent amendments. If the authorized designee as reflected in the resolution, the awarded NOFA amount or your entity status has changed, you are required to provide, to the Department, a new resolution consistent with the terms of the NOFA award and adopted by your Board.

6. Return the e-signed copy or the signed hardcopy of the STD 213; and, if applicable, the certified resolution within 30 da s from the date of this letter to the following address:

Department of Housing and Community Development
Business & Contract Services Branch
Contracts Office Attention: Viet Luong
2020 W. El Camino Avenue, Suite 130
Sacramento, CA 95833
7 Maintain a complete electronic version of the STD 213 and Exhibits for your pending ?le. Note: The Standard Agreement contract is not effective until it is signed by the Awardee's designated official and the Department.

The Department reserves the right to cancel any pending Standard Agreement in its entirety if not returned within the required 30-day period.

Please contact Paul McDougal| Program Manager, at , ifyou have any questions regarding the Standard Agreement or the provisions therein.

Sincerely,
Contract Analyst
cc: Paul McDougal| Program Manager
nnl vv\1\aIIl\|| All knnl A». an

Page 196 of 314 ends

16 htfps://www. dgs. ca.gov/OL 8/Resources
STATE
CA
TWLE
ZP
92860
STATE OF CALIFORNIA — DEPARTMENT OF GENERAL sco ID;

SERVICES
AGREEMENT NUMBER PURCHASING AUTHORITY NUMBER (Ifapplicable) STD 213 (Rev. 04/2020) 21-LEAP-15911

1. This Agreement is entered into between the Contracting Agency and the Contractor named below:

CONTRACTING AGENCY NAME

DEPARTMENT OF HOUSING AND COMMUNITYDEVELOPMENT

CONTRACTOR'S NAME
City of Norco

2. The term of this Agreement is:

START DATE
Upon HCD Approval

THROUGH END DATE
06/30/2024

3. The maximum amount of this Agreement is:
$149,500.00

EXHIBITS TITLE
Exhibit A Authority, Purpose and Scope of Work
Exhibit B Budget Detail and Payment Provisions
Exhibit C* State of California General Terms and Conditions Exhibit D LEAP Terms and Conditions
Exhibit E Special Conditions

TOTAL NUMBER OF PAGES ATTACHED
Items shown with an asterisk ("), are hereby incorporated by reference and made part of this agreement as if attached hereto.

These documents can be viewed at
IN WITNESS WHEREOF, THIS AGREEMENT HAS BEEN EXECUTED BY THE PARTIES HERETO.

CONTRACTOR
CONTRACTOR NAME (if other than an individual, state whether a corporation, partnership,etc.) City of Norco

CONTRACTOR BUSINESS ADDRESS
2870 Clark Avenue

PRINTED NAME OF PERSON SIGNING

CONTRACTOR AUTHORIZED SIGNATURE DATE SIGNED

CONTRACTING AGENCY NAME
Department of Housing and Community Development

CONTRACTING AGENCY ADDRESS CITY STATE ZIP
2020 w. El Camino Ave.. Suite 130 3a°'ame“t° CA 95833

PRINTED NAME OF PERSON SIGNING TITLE
Contracts Manager.

Business & Contract Services Branch

CONTRACTING AGENCY AUTHORIZED SIGNATURE DATE SIGNED
California Department of General Services Approval (or exemption, if applicable) Exempt per; SCM Vol. 1 4.04.A.3 (DGS memo dated 06/12/1981) CITY
Norco

STATE OF CALIFORNI

4. The parties agree to comply with the terms and conditions of the following exhibits, which are by this reference made a part of the Agreement.

GTC - 04/2017
PAGES
Andy Okoro
City Manager
March 2, 2022
_______________________________

Page 197 of 314 ends

City of Norco
21-LEAP—
16911Page 1 of 2

EXHIBIT A

AUTHORITY PURPOSE AND SCOPE OF WORK
Authorit
Pursuant to Chapter 3.1 of the California Health and Safety Code (Ch. 159, Sec. 11, Stats. 2019), the State of California Department of Housing and Community Development (the “Department” or “State”) has established the Local Early Action Planning Grants Program (“LEAP,” or the “Program”), as defined in Health and Safety Code Section 50515, et seq., for Local Governments and Localities. In furtherance of the purpose of the Program, the Department has issued a Notice of Funding Availability (“NOFA”) dated January 27, 2020. This Standard Agreement, along with all its exhibits (the “Agreement”), is entered into under the authority of, and in furtherance of, the purpose of the Program.

Pur ose
In accordance with the authority cited above, the Grantee has been awarded financial assistance in the form of a grant from the Program. The Department has agreed to make the grant to provide financial assistance for technical assistance, preparation and adoption of planning documents, and process improvements to accelerate housing production and facilitate compliance to implement the sixth cycle of the regional housing needs assessment, pursuant to the terms of the NOFA, which includes associated forms, and this Agreement. By entering into this Agreement and thereby accepting the award of the Program funds, the Grantee agrees to comply with the terms and conditions of the NOFA, this Agreement, subsequent amendments to this agreement when necessary, the representations contained in the application and the requirements of the authority cited above. Based on the representations made by the Grantee, the State shall provide a grant in the amount shown in Exhibit B, Section 2.

Definitions
Terms herein shall have the same meaning as definitions in Section VIIIof the LEAP NOFA, Sco e of Work
Preparation and adoption of planning documents and process improvements that accelerate housing production and facilitate compliance in implementing the sixth cycle of the regional housing needs assessment in accordance with the Grantee’s Attachment 1: Project Timeline and Budget and Project Description as provided by the Grantee in the LEAP application used for subsequent approval by the Department.

De artment Contract Coordinator
The Contract Coordinator of this Agreement for the Department is the Housing Policy Development Program Manager, or the Manager’s designee. Unless othem/ise informed, any Local Early Action Planning (LEAP)
NOFA Date: January 27, 2020
Approved Date: May 29, 2020
Prep. Date: December 10, 2020

Page 198 of 314 ends

EXHIBITA
notice, report, or other communication required by this Agreement shall be mailed by first class mail to the Department Contract Coordinator at the following address:

Department of Housing and Community Development
Housing Policy Development
Attention: LEAP Program Manager
2020 West El Camino Avenue, Suite 500
Sacramento, CA 95833
City of Norco
21-LEAP-16911

Page 2 of 2 ends

02/1 1/20222
Local Early Action Planning (LEAP)
NOFA Date: January 27, 2020
Approved Date: May 29, 2020
Prep. Date: December 10, 2020

Page 199 of 314 ends

EXHIBIT B
City of Norco
21-LEAP—16911

Page 1 of 5 ends

1. 2.

3. A
A.

BUDGET DETAIL AND PAYMENT PROVISIONS
Iication for Funds
The Department is entering into this Standard Agreement (“Agreement”) on the basis of, and in reliance on, facts, information, assertions and representations contained in the Application and any subsequent modi?cations or additions thereto approved by the Department. The Application and any approved modi?cations and additions thereto are hereby incorporated into this Agreement.

The Grantee warrants that all information, facts, assertions and representations contained in the Application and approved modi?cations and additions thereto are true, correct, and complete to the best of the Grantee’s knowledge. In the event that any part of the Application and any approved modi?cation and addition thereto is untrue, incorrect, incomplete, or misleading in such a manner that would substantially affect the Department's approval, disbursement, or monitoring of the funding and the grant or activities governed by this Agreement, the Department may declare a breach hereof and take such action or pursue such remedies as are provided for breach.

Grant and Reimbursement Limit
The Department’s decision to approve or deny an application or request for funding pursuant to the Program, and its determination of the amount of funding provided, shall be ?nal. The maximum total amount granted and reimbursable to the Grantee pursuant to this Agreement shall not exceed $149,500.00.

Grant Timelines
A. This Agreement is effective upon the date of the Department representatives signature on page one of the fully executed Standard Agreement, STD 213, (the “Effective Date").

All Grant funds must be expended by the Grantee on or before December 31, 2023. To ensure that the Grantee is reimbursed on or before December 31, 2023, the Grantee shall deliver to the Department all ?nal invoices for reimbursement on or before September 30, 2023. Under special circumstances, as determined by the Department, the Department may modify the September 30, 2023 deadline.

It is the responsibility of the Grantee to monitor the project and timeliness of draws within the speci?ed dates.

Local Early Action Planning (LEAP)
NOFA Date: January 27, 2020
Approved Date: May 29, 2020
Prep. Date: December 30, 2020

Page 200 of 314 ends

City of Norco
21-LEAP-16911

Page 2 of 5 ends

EXHIBITB

4. Allowable Uses of Grant Funds
A.

G.

The Department shall not disburse funds unless it determines that the grant funds shall be expended in compliance with the terms and provisions of the NOFA and this Agreement.

Grant funds shall only be used by the Grantee for eligible activities pursuant to Section VII of the NOFA and only for activities that were approved by the Department, and as stated in Attachment 1: Project Timeline and Budget and Project Description in the Grantee’s approved LEAP Application, , andlor any and all documentation incorporated into this Agreement and made a part thereof.

Grant funds may not be used for administrative costs of persons employed by the Grantee for activities not directly related to the preparation and adoption of the proposed activity. The Grantee shall use no more than ?ve percent of the total grant amount for costs related to administration of the project.

A Grantee that receives funds under this Program may use a subcontractor. The subcontract shall provide for compliance with all the requirements of the Program. The subcontract shall not relieve the Grantee of its responsibilities under the Program.

After the contract has been executed by the Department and all parties, approved and eligible costs for eligible activities may be reimbursed upon completion of deliverables in accordance with Attachment 1: Project Timeline and Budget and Project Description, and subject to the terms and conditions of this Agreement.

Only approved and eligible costs incurred for work after the NOFA date, continued past the date of full execution of the Agreement, and completed during the grant term, will be reimbursable.

Approved and eligible costs incurred prior to the NOFA date are ineligible and will not be reimbursed.

5. Performance
A.

B.

The Grantee shall take such actions, pay such expenses, and do all things necessary to complete all activities as incorporated into the LEAP application and in accordance with the schedule for completion set forth in the Statement of Work, the Grantee’s Project Description and Attachment 1: Project Timeline and Budget, and within the terms and conditions of this Agreement.

The Department may monitor expenditures and activities of Grantee, as the department deems necessary, to ensure compliance with program requirements.

Local Early Action Planning (LEAP)
NOFA Date: January 27, 2020
Approved Date: May 29, 2020 — Prep. Date: December 30, 2020

Page 201 of 314 ends

City of Norco
21-LEAP-16911

Page 3 of 5 ends

EXHIBITB
C. The Department may request repayment of funds from Grantee or pursue other remedies available to it by law for failure to comply with program requirements.

6. Fiscal Administration
A. The Grantee is responsible for maintaining records which fully disclose the activities funded by the LEAP grant. Adequate documentation for each reimbursable transaction shall be maintained to permit the determination, through an audit ifrequested by the State, of the accuracy of the records and the allowability of expenditures charged to LEAP grant funds. Ifthe allowability of expenditure cannot be determined because records or documentation are inadequate, the expenditure may be disallowed, and the State shall determine the reimbursement method for the amount disallowed. The State’s determination of the allowability of any expense shall be final, absent fraud, mistake or arbitrariness.

B. Work must be completed prior to requesting reimbursement. The Department may make exceptions to this provision on a case by case basis. In unusual circumstances, the Department may consider alternative arrangements to reimbursement and payment methods based on documentation demonstrating cost burdens, including the inability to pay for work.

C. Prior to receiving reimbursement, the Grantee shall submit the following documentation:
1) Government Agency Taxpayer ID Form (GovT|N; Fi$ca| form); 2) A Request forvReimbursement form provided by the Department on the Department’s Local Early Action Planning (LEAP) Grants webpage; and 3) Any and all documentation requested by the Department in the Request for Reimbursement form and manner as outlined in the following subsection D.

D. Grantee shall submit all required reimbursement documentation to the following address:

Department of Housing and Community Development
Housing Policy Development
Attention: LEAP Program Manager
2020 West El Camino Avenue, Suite 500
Sacramento, CA 95833
E. The Grantee shall submit invoices for reimbursement to the Department. All invoices shall be subject to the Department’s approval and submitted in accordance with the following schedule:

Local Early Action Planning (LEAP)
NOFA Date: January 27, 2020
Approved Date: May 29, 2020
Prep. Date: December 30, 2020

Page 202 of 314 ends

IV
3 I I
I I
-I I II
*'
I
'
. "
I
1:

I
_
I .

I
,.
. ,, . ....,‘
. ' H I
I I .

II
I
‘
II
"
v I.

I
' .
' II : I I
I I
I ~.
"
I I
I I I
r I I I
'
I' I
- '
I I I
I II I
' I
, . VI
m I

EXHIBIT B
City of Norco
21-LEAP-16911

Page 4 of 5 ends

1) At maximum, once per quarter; or
2) Upon completion of a deliverable; and
3) At minimum, one invoice for reimbursement annually.

The Department willuse the 2020 calendar year beginning from the date of the release of the NOFA on January 27, 2020 as the basis for scheduling reimbursements, with ?rst requests for reimbursement accepted upon full execution of the Agreement by the Grantee and the Department.

F The Request for Reimbursement must be for a minimum of fifteen percent (15%) of the maximum grant amount awarded. The Department may consider exceptions to the minimum amount requested on a case-by-case basis. All invoices shall reference the contract number and shall be signed and submitted to the Department’s Program Manager at the address provided above in Section 6, Subsection D of this part. Invoices shall include at a minimum the following information:
1) Names of the Grantee’s personnel performing work;
2) Dates and times of project work;
3) Itemized costs in accordance with Attachment 1: Project Timeline and Budget, and Project Description, including identi?cation of each employee, contractor or subcontractor who provided services during the period of the invoice, the number of hours and hourly rates for each of the Grantee’s employees, contractor(s). subrecipient(s) or subcontractor’s staff member(s), authorized expenses with receipts, and contractor.sub-recipient and subcontractor invoices; and 4) Any other documents, certifications, or evidence deemed necessary by the Department prior to disbursement of grant funds.

G. The Department willreimburse the Grantee directly for all allowable project costs as promptly as the Department's fiscal procedures permit upon receipt of an itemized signed invoice.

H. The Department recognizes that budgeted deliverable amounts are based upon estimates and conditions and circumstances may change. Grantees may request adjustments to Attachment 1: Project Timeline and Budget and Project Description in the Grantee’s approved LEAP Application in writing (such as a budget adjustment across deliverables), as long as the total budget does not exceed the maximum amount awarded to the Grantee. All adjustments shall be subject to written approval by the Department.

Local Early Action Planning (LEAP)
NOFA Date: January 27, 2020
Approved Date: May 29, 2020
Prep. Date: December 30, 2020

Page 203 of 314 ends

I
:.
mm
-»A—.

H
u
..|
-:
n
.«
n
u
__
_,_1|_
'
:
,.'.
n :
ul ll .

In;
H
I.
n
u -n
u
::
u
: 2 H
.1
H
u
I.
r
H
u u
I ..
: 1| .0 u
City of Norco
21-LEAP-16911

Page 5 of 5 ends

EXHIBITB
Grant funds shall not be disbursed until this Agreement has been fully executed.

Grant fund payments willbe made on a reimbursement basis; advance payments are not allowed. The Grantee, its subcontractors and all partners, must have adequate cash flow to pay all grant-related expenses prior to requesting reimbursement from the Department. The Department may consider alternative arrangements for reimbursement and payment methods based on documentation demonstrating cost burdens, including the inability to pay for work.

The Grantee will be responsible for compiling and submitting all invoices, supporting documentation and reporting documents. Invoices must be accompanied by reporting materials where appropriate. Invoices without the appropriate reporting materials will not be paid.
1) Supporting documentation may include, but is not limited to; purchase orders, receipts, progress payments, subcontractor invoices, timecards, or any other documentation as deemed necessary and requested by the Department to support the reimbursement to the Grantee for expenditures incurred.

The Grantee willsubmit for reimbursements to the Department based on actual costs incurred, and must billthe State based on clear and completed objectives and deliverables as outlined in the application, in Attachment 1: Project Timeline and Budget and the Project Description, and/or any and all documentation incorporated into this Agreement and made a part thereof.

The Department may withhold ten percent (10%) of the grant until grant terms have been ful?lled to the satisfaction of the Department and the final close-out report submitted, no later than December 31, 2024 pursuant to Health and Safety Code section 50515.04(c)(2).

It is mutually agreed that ifthe Budget Act of the current year and/or any subsequent years covered under this Agreement does not appropriate sufficient funds for the program, this Agreement shall immediately terminate and be of no further force and effect. In this event, the State and Contractor shall be relieved of any and all obligations under this Grant Agreement.

Iffunding for any fiscal year is reduced or deleted by the Budget Act for purposes of this program, the State shall have the sole discretion to cancel this Agreement without cause, no liability occurring to the State, or amend the current Grant Agreement and amount allocated to Contractor.

Local Early Action Planning (LEAP)
NOFA Date: January 27, 2020
Approved Date: May 29, 2020
Prep. Date: December 30, 2020

Page 204 of 314 ends

City of Norco
21-LEAP-16911

Page 1 of 9 ends

EXHIBIT D

LEAP TERMS AND CONDITIONS
&p_o£i1Lo1
A. During the term of this Standard Agreement (“Agreement”) the Grantee shall submit, upon request of the Department, a performance report that demonstrates satisfaction of all requirements identified in this Agreement.

Pursuant to Health and Safety Code Section 50515.04, subsection (a), during the term of the Agreement, the Grantee shall submit an annual report containing all required information by April 1 of the year following receipt of the Grant funds. The annual reports shall be due from the Grantee until Program funds have been expended, but no later than February 28, 2023. A Grantee may, in lieu of providing a separate annual report as identified in Health and Safety Code Section 50515.04, subsection (a), provide the information as part of its Annual Progress Report.

Upon completion of all deliverables required to fulfillthis Agreement pursuant to the Grantee's Attachment 1: Project Timeline and Budget as approved in the LEAP Application, the Grantee shall submit a ?nal close out report in accordance with the January 27, 2020 LEAP NOFA. The close out report shall be submitted with the final Request for Reimbursement by September 30, 2023, in accordance with the ?nal invoices due pursuant to Exhibit B, Section 3.

Accountin Records
A. The Grantee, its staff, contractors and subcontractors shall establish and maintain an accounting system and reports that properly accumulate incurred project costs by line.

The accounting system shall conform to Generally Accepted Accounting Principles (GAAP), to enable the determination of incurred costs at interim points of completion and provide support for reimbursement payment vouchers or invoices.

The Grantee must establish a separate ledger account for receipts and expenditures of grant funds and maintain expenditure details in accordance with the scope of work, project timeline and budget. Separate bank accounts are not required.

The Grantee shall maintain documentation of its normal procurement policy and competitive bid process (including the use of sole source purchasing), and ?nancial records of expenditures incurred during the course of the project in accordance with GAAP.

The Grantee agrees that the state or designated representative shall have the right to review and to copy any records and supporting documentation pertaining to the performance of the Agreement.

Subcontractors employed by the Grantee and paid with moneys under the terms of this Local Early Action Planning (LEAP)
NOFA Date: January 27, 2020
Approved Date: May 29, 2020
Prep. Date: December 30, 2020

Page 205 of 314 ends

J--—-
gj £1!‘-—I-P-L ulu hi‘: 1I -'jI|-If:
1—-'-I'\-‘uni.’-'-u-u--1'-u-u-l'ls~
.

I..|rI.I. -r.-na '-II I -II-..-I--I ...I I-_I.-
I-|—l-“-I-'-'.- —I ... I
-_IJ.I-....I I. -. .--..
__I...._u'-,_I. .I.u'h-I—- .r.-__I. —I. ..
-_- I. -_‘— -- --. .I.a_...J.., . -—. _.
-I-u—r 'I''‘ ''II'.‘' I-I'I—" -I-‘-rI—-
I
-.-uI__ J.-—I.u-w-.I.-.I.IIrI.I.I.I.a.-
".J||uI.I-u-IlF.!.J|-I.-dl— .a _I —-'|-I-Il|.'--'-
....-,.I.I.r_ Jlu 1-..

I- -
-I._..I_-.I .I.-.Ih.I-.-II--II-I_I-I.I.-I-.I—
...I_: I--I.--II-II-
' Iu'JuI——I-IIIEI-'I—'—'uf-IJJIIJ II-I:|u—
-2 I —Lii -- I-IFJJ SH - I: m‘: I?j —-'-
...._.-._.-....-.n_—..I. ..l — - . ...-.-. . ——.-'.I.—.- ‘_.- -.-__ -- f’—"l':H'I_'l"-:>—'I'kl‘:i -I-I-I-I-*-L
-I-hul--.I --II-I-|H.-.--I|I=-I.--r- —I-I-I-I-I-I-I.
'I |.I,-.- ....... _....g.._I... ......._.._.—_..-
........_.....m,..,.. .._.....,...._l. _......I."_._..
—II I-I.- .r -I.-.I.I..-un - I.I.--.-u.I. - . I

1. — I.I_I. I.-—I_.-I_..- -_I..... _I.-
-..._ .l. I. __ ...I_ ..___-___a-.._ .-
--Ilr I- I—'--I-I--rr -'-I—I-I.-— -I.-I-II-.--
<
I.

II all 1 - II III I
. .._:_,_I-._. _ ..._ -a. J_. I: H:
-_...._-_n..._...._ ..._“,._._. ...,.,._
I- ‘J -I-.--1 F|'fIfI I-
- . IIII-J—II. - I_I.- ----._l.._Ia-.-I.I_-_
-.._. J. -_I_ 1|. -- I_I.. ._._I. ---.

In..__,.J.I_I_
-- ...I.I-. .-.-
sII-_ [1
.;'.H_I'|—.
.v.. .I. 2,. . _._.

City of Norco
21—
LEAP-16911 Page 2 of 9

3. Audits
A.

EXHIBIT D
Agreement shall be responsible for maintaining accounting records as specified above.

Grantee shall monitor and enforce subcontracts accordingly.

At any time during the term of this Agreement, the Department may perform or cause to be performed a ?nancial audit of any and all phases of the award. At the Department’s request, the Grantee shall provide, at its own expense, a financial audit prepared by a certi?ed public accountant. The State of California has the right to review project documents and conduct audits during and over the project life. 1) The Grantee agrees that the Department or the Department’s designee shall have the right to review, obtain, and copy all records and supporting documentation pertaining to performance of this Agreement. 2) The Grantee agrees to provide the Department or the Department’s designee, with any relevant information requested.
3) The Grantee agrees to permit the Department or the Department’s designee access to its premises, upon reasonable notice, during normal business hours for the purpose of interviewing employees who might reasonably have information related to such records and inspecting and copying such books, records, accounts, and other material that may be relevant to a matter under investigation for the purpose of determining compliance with statutes and this Agreement.

Ifa financial audit is required by the Department, the audit shall be performed by an independent certified public accountant. Selection of an independent audit firm shall be consistent with procurement standards contained in Exhibit D, Section 8 subsection A. of this Agreement.
1) The Grantee shall notify the Department of the auditor's name and address immediately after the selection has been made. The contract for the audit shall allow access by the Department to the independent auditor's working papers. 2) The Grantee is responsible for the completion of audits and all costs of preparing audits.
3) Ifthere are audit findings, the Grantee must submit a detailed response acceptable to the Department for each audit finding within ninety (90) days from the date of the audit finding report.

The Grantee agrees to maintain such records for possible audit after final payment pursuant to Exhibit D, Section 3, subsection E. below, unless a longer period of records retention is stipulated.
2/1 1/20222
Local Early Action Planning (LEAP)
NOFA Date: January 27, 2020
Approved Date: May 29, 2020
Prep. Date: December 30, 2020

Page 206 of 314 ends

City of Norco
21-LEAP-16911

Page 3 of 9 ends

EXHIBIT D
1) If any litigation, claim, negotiation, audit, monitoring, inspection or other action has been started before the expiration of the required record retention period, all records must be retained by the Grantee, contractors and sub-contractors until completion of the action and resolution of all issues which arise from it. The Grantee shall include in any contract that it enters into in an amount exceeding $10,000.00, the Department’s right to audit the contractor's records and interview their employees.
2) The Grantee shall comply with the caveats and be aware of the penalties for violation of fraud and for obstruction of investigation as set forth in California Public Contracts Code Section 10115.10.

D. The determination by the Department of the eligibilityof any expenditure shall be final.

E. The Grantee shall retain all books and records relevant to this Agreement for a minimum of three (3) years after the end of the term of this Agreement. Records relating to any and all audits or litigation relevant to this Agreement shall be retained for five (5) years after the conclusion or resolution of the matter

4. Remedies of Non- erformance
A. The Department may monitor expenditures and activities of an applicant, as the Department deems necessary, to ensure compliance with Program requirements.

B. The Department may, as it deems appropriate or necessary, request repayment of funds from an applicant, or pursue any remedies available to it by law for failure to comply with Program requirements.

C. Any dispute concerning a question of fact arising under this Agreement that is not disposed of by agreement shall be decided by the Department’s Housing Policy Development Manager, or the Manager’s designee, who may consider any written or verbal evidence submitted by the Grantee. The decision of the Department’s Housing Policy Development Manager or Designee shall be the Department’s ?nal decision regarding the dispute.

D. Neither the pendency of a dispute nor its consideration by the Department will excuse the Grantee from full and timely performance in accordance with the terms of this Agreement.

In the event that it is determined, at the sole discretion of the Department, that the Grantee is not meeting the terms and conditions of the Agreement, immediately upon receiving a written notice from the Department to stop work, the Grantee shall cease all work under the Agreement. The Department has the sole discretion to determine that the Grantee meets the terms and conditions after a stop work order, and to deliver a written notice to the grantee to resume work under the Agreement.

Local Early Action Planning (LEAP)
NOFA Date: January 27, 2020
Approved Date: May 29, 2020
Prep. Date: December 30, 2020

Page 207 of 314 ends

‘TI
vs:

City of Norco
21-LEAP-16911

Page 4 of 9 ends

EXHIBITD
Both the Grantee and the Department have the right to terminate the Agreement at any time upon thirty (30) days written notice. The notice shall specify the reason for early termination and may permit the grantee or the Department to rectify any deficiency(ies) prior to the early termination date. The Grantee willsubmit any requested documents to the Department within thirty (30) days of the early termination notice.

There must be a strong implementation component for the funded activity through this Program, including, where appropriate, agreement by the locality to formally adopt or complete the planning document. Localities that do not formally adopt or complete the funded activity could be subject to repayment of the grant.

The following shall each constitute a breach of this Agreement:
1) Grantee's failure to comply with any of the terms and conditions of this Agreement. 2) Use of, or permitting the use of, grant funds provided under this Agreement for any ineligible costs or for any activity not approved under this Agreement. 3) Any failure to comply with the deadlines set forth in this Agreement unless approved by the Program Manager.

In addition to any other remedies that may be available to the Department in law or equity for breach of this Agreement, the Department may at its discretion, exercise the following remedies:
1) Disqualify the Grantee from applying for future Department administered grant programs.
2) Revoke existing LEAPaward(s) to the Grantee.
3) Require the return of unexpended LEAP funds disbursed under this Agreement. 4) Require repayment of LEAP Funds disbursed and expended under this Agreement.
5) Seek a court order for speci?c performance of the obligation defaulted upon, or the appointment of a receiver to complete the obligations in accordance with the LEAP Program requirements.
6) Other remedies available at law, or by and through this Agreement. Allremedies available to the Department are cumulative and not exclusive. 7) The Department may give written notice to the Grantee to cure the breach or violation within a period of not less than fifteen (15) days.

Local Early Action Planning (LEAP)
NOFA Date: January 27, 2020
Approved Date: May 29, 2020
Prep. Date: December 30, 2020

Page 208 of 314 ends

City of Norco
21-LEAP-16911

Page 5 of 9 ends

EXHIBITD

5. Indemnification
Neither the Department nor any officer or employee thereof is responsible for any injury, damage or liability occurring by reason of anything done or omitted to be done by the Grantee, its of?cers, employees, agents, its contractors, its sub-recipients or its subcontractors under or in connection with any work, authority orjurisdiction conferred upon the Grantee under this Agreement. it is understood and agreed that the Grantee shall fully defend, indemnify and save harmless the Department and all of the Department's staff from all claims, suits or actions of every name, kind and description brought forth under, including, but not limited to, tortuous, contractual, inverse condemnation or other theories or assertions of liability occurring by reason of anything done or omitted to be done by the Grantee, its officers, employees, agents contractors, sub-recipients, or subcontractors under this Agreement.

6. Waivers
No waiver of any breach of this Agreement shall be held to be a waiver of any prior or subsequent breach. The failure of the Department to enforce at any time the provisions of this Agreement, or to require at any time, performance by the Grantee of these provisions, shall in no way be construed to be a waiver of such provisions nor to affect the validity of this Agreement or the right of the Department to enforce these provisions.

7. Relationshi of Parties
It is expressly understood that this Standard Agreement is an agreement executed by and between two independent governmental entities and is not intended to, and shall not be construed to, create the relationship of agent, servant, employee, partnership, joint venture or association, or any other relationship whatsoever other than that of an independent party.

8. Third-Part Contracts
A. Allstate-government funded procurements must be conducted using a fair and competitive procurement process. The Grantee may use its own procurement procedures as long as the procedures comply with all City/County laws, rules and ordinances governing procurement, and all applicable provisions of California state law.

B. Any contract entered into as a result of this Agreement shall contain all the provisions stipulated in the Agreement to be applicable to the Grantee’s sub-recipients, contractors, and subcontractors. Copies of all agreements with sub-recipients, contractors, and subcontractors shall be submitted to the Department’s program manager upon request.

C. The Department does not have a contractual relationship with the Grantee’s subrecipients, contractors, or subcontractors, and the Grantee shall be fully responsible for all work performed by its sub-recipients, contractors, or subcontractors.

D. In the event the Grantee is partnering with anotherjurisdiction or forming a collaborative effort between the Grantee and other jurisdictions who are grantees of the Local Early Local Early Action Planning (LEAP)
NOFA Date: January 27, 2020
Approved Date: May 29, 2020
Prep. Date: December 30, 2020

Page 209 of 314 ends

City of Norco
21—
LEAP-16911 Page 6 of 9

EXHIBIT D
Action Planning Grants Program, the Grantee acknowledges that each partner and/or all entities forming the Local Early Action Planning Grants Program collaborative are in mutual written agreement with each other but are contractually bound to the Department under separate, enforceable contracts.
in the event the Grantee is partnering with anotherjurisdiction or forming a collaborative effort with other entities that are not grantees of the Local Early Action Planning Grants Program, the Department shall defer to the provisions as noted in subsections 8(B) and 8(C) of this part.

9. Com liance with State and Federal Laws Rules and Re ulations A. The Grantee agrees to comply with all state and federal laws, rules and regulations that pertain to construction, health and safety, labor, fair employment practices, equal opportunity, and all other matters applicable to the grant, the Grantee, its contractors or subcontractors, and any other grant activity.

B. During the performance of this Agreement, the Grantee assures that no otherwise qualified person shall be excluded from participation or employment, denied program benefits, or be subjected to discrimination based on race, color, ancestry, national origin, sex, gender, gender identity, gender expression, genetic information, age, disability, handicap, familial status, religion, or belief, under any program or activity funded by this contract, as required by Title Vl of the Civil Rights Act of 1964, the Fair Housing Act (42 USC 3601-20) and all implementing regulations, and the Age Discrimination Act of 1975 and all implementing regulations.

C The Grantee shall include the nondiscrimination and compliance provisions of this clause in all agreements with its sub-recipients, contractors, and subcontractors, and shall include a requirement in all agreements with all of same that each of them in turn include the nondiscrimination and compliance provisions of this clause in all contracts and subcontracts they enter into to perform work under the Program.

D. The Grantee shall, in the course of performing project work, fully comply with the applicable provisions of the Americans with Disabilities Act (ADA) of 1990, which prohibits discrimination on the basis of disability, as well as all applicable regulations and guidelines issued pursuant to the ADA. (42 U.S.C. 12101 et seq.) E. The Grantee shall adopt and implement af?rmative processes and procedures that provide information, outreach and promotion of opportunities in the LEAP project to encourage participation of all persons regardless of race, color, national origin, sex, religion, familial status, or disability. This includes, but is not limited to, a minority outreach program to ensure the inclusion, to the maximum extent possible, of minorities and women, and entities owned by minorities and women, as required by 24 CFR

92.351
Local Early Action Planning (LEAP)
NOFA Date: January 27, 2020
Approved Date: May 29, 2020
Prep. Date: December 30, 2020

Page 210 of 314 ends

12. State-Owned Data
A. Definitions
City of Norco
21-LEAP-16911

Page 7 of 9 ends

EXHIBITD

10. Liti ation
A. If any provision of this Agreement, or an underlying obligation, is held invalid by a court of competent jurisdiction, such invalidity, at the sole discretion of the Department, shall not affect any other provisions of this Agreement and the remainder of this Agreement shall remain in fullforce and effect. Therefore, the provisions of this Agreement are, and shall be, deemed severable.

B. The Grantee shall notify the Department immediately of any claim or action undertaken by or against it, which affects or may affect this Agreement or the Department, and shall take such action with respect to the claim or action as is consistent with the terms of this Agreement and the interests of the Department.

11. Chan es in TermslAmendments
This Agreement may only be amended or modi?ed by mutual written agreement of both parties. 1) Work:

The work to be directly or indirectly produced by the Grantee, its employees, or by and of the Grantee’s contractor’s, subcontractor’s and/or sub-recipient’s employees under this Agreement.
2) Work Product:

All deliverables created or produced from Work under this Agreement including, but not limited to, all Work and Deliverable conceived or made, or made hereafter conceived or made, either solely orjointly with others during the term of this Agreement and during a period of six months after the termination thereof, which relates to the Work commissioned or performed under this Agreement. Work Product includes all deliverables, inventions, innovations, improvements, or other works of authorship Grantee and/or Grantee’s contractor subcontractor and/or sub—recipient may conceiveof or develop in the course of this Agreement, whether or not they are eligible for patent, copyright, trademark, trade secret or other legal protection. 3) Inventions:

Any ideas, methodologies, designs, concept, technique, invention, discovery, improvement or development regardless of patentability made solely by the Grantee or jointly with the Grantee’s contractor, subcontractor and/or sub—recipient and/or Grantee’s contractor, subcontractor, and/or sub-recipient’s employees with one or more employees of the Department during the term of this Agreement and in performance of any Work Local Early Action Planning (LEAP)
NOFA Date: January 27, 2020
Approved Date: May 29, 2020
Prep. Date: December 30, 2020

Page 211 of 314 ends

1 -.
. .

I .I .
. . II .
u
. ' I
u. . . . .

1.“ .
.
.
u .; u
u :'
u
u.- . u-
: I
I u
" . .
. ,, . .

I u
'
Ir
_ .- .

I
.-.
v. I .u. _
I . .. . u . ._ 2
I
u I u : II
n
: u x‘ u
y‘
u
:11 » .
|
I
u u H
I I u n In
_ I
u . u
I
u
u
: u
.
.

H
‘V
II I
H . -. .
'I I
.-- -'- 1-1
I. v. . . . ,. . . .
.
. . .
.. .
... H
.‘ .

H
.‘ H.

I‘ I . ._
.
- H
H
I I
. .
.

City of Norco
21-LEAP-16911

Page 8 of 9 ends

EXHIBIT D
under this Agreement, provided that either the conception or reduction to practice thereof occurs during the term of this Agreement and in performance of Work issued under this Agreement.

Ownership of Work Product and Rights
1)
2)
3)
4)
Allwork Product derived by the Work performed by the Grantee, its employees or by and of the Grantee’s contractor’s, subcontractor’s and/or sub-recipient’s employees under this Agreement, shall be owned by the Department and shall be considered to be works made for hire by the Grantee and the Grantee’s contractor, subcontractor and/or subrecipient for the Department. The Department shall own all copyrights in the work product.

Grantee, its employees and all of Grantee’s contractor’s, subcontractor’s and sub-recipient’s employees agree to perpetually assign, and upon creation of each Work Product automatically assigns, to the Department, ownership of all United States and international copyrights in each and every Work Product, insofar as any such Work Product, by operation of law, may not be considered work made for hire by the Grantee’s contractor, subcontractor and/or subrecipient from the Department. From time to time upon the Department’s request, the Grantee’s contractor, subcontractor and/or subrecipients, and/or its employees, shall confirm such assignments by execution and delivery of such assignment, confirmations or assignment or other written instruments as the Department may request. The Department shall have the right to obtain and hold in its name all copyright registrations and other evidence of rights that may be available for Work Product under this Agreement. Grantee hereby waives all rights relating to identi?cation of authorship restriction or limitation on use or subsequent modification of the Work.

Grantee, its employees and all Grantee’s contractors, subcontractors and subrecipients hereby agrees to assign to the Department all Inventions, together with the right to seek protection by obtaining patent rights therefore and to claim all rights or priority thereunder and the same shall become and remain the Department’s property regardless of whether such protection is sought. The Grantee, its employees and Grantee’s contractor, subcontractor and lor subrecipient shall promptly make a complete written disclosure to the Department of each Invention not othenrvise clearly disclosed to the Department in the pertinent Work Product, specifically noting features or concepts that the Grantee, its employees and/or Grantee’s contractor, subcontractor and/or subrecipient believes to be new or different.

Upon completion of all work under this Agreement, all intellectual property rights, ownership and title to all reports, documents, plans, speci?cations and estimates, produced as part of this Agreement willautomatically be vested in Department and no further agreement willbe necessary to transfer ownership to Department.

Local Early Action Planning (LEAP)
NOFA Date: January 27, 2020
Approved Date: May 29, 2020
Prep. Date: December 30, 2020

Page 212 of 314 ends

13. S ecial Conditions
The State reserves the right to add any special conditions to this Agreement it deems necessary to assure that the policy and goals of the Program are achieved.

EXHIBIT D
City of Norco
21-LEAP-16911

Page 9 of 9 ends

Local Early Action Planning (LEAP)
NOFA Date: January 27, 2020
Approved Date: May 29, 2020
Prep. Date: December 30, 2020

Page 213 of 314 ends

RESOLUTION NO. 2022-16

A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF NORCO,

CALIFORNIA, AUTHORIZING ENDORSEMENT OF THE GRANT

AWARD FOR, AND RECEIPT OF, THE LOCAL EARLY ACTION

PLANNING (LEAP) GRANT FUNDS FROM THE STATE
DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT.

WHEREAS, pursuant to Health and Safety Code 50515 et seq., the Department of Housing and Community Development (Department) is authorized to issue a Notice of Funding Availability (NOFA) as part of the Local Government Planning Support Grants Program (hereinafter referred to by the Department as the Local Early Action Planning Grants Program or (LEAP); and WHEREAS, the State of California, Department of Housing and Community Development (HCD) has issued a Notice of Funding Availability (NOFA) in the amount of $119,040,000 for assistance to all California jurisdiction and extended its deadline for submittal to January 31, 2021 for the (LEAP); and WHEREAS, The City Council of the City of Norco responded to the NOFA by submitting an application for the LEAP grant application package (in the amount of $149,500), for approval of grant funding for projects that assist in the preparation and adoption of Planning Documents and process improvements that accelerate housing production and facilitate compliance to implement the 6th Cycle Regional Housing Needs Assessment (RHNA); and
WHEREAS, The City of Norco applied for a LEAP grant and was awarded the requested amount of $149,500 from the State Housing and Community Development Department on February 11, 2022; and
NOW, THEREFORE, the City Council of the City of Norco, California, does hereby resolve as follows:

SECTION 1. The City Council of the City of Norco hereby authorizes and directs the City Manager to sign the contract and resubmit accordingly to the State for processing;
SECTION 2. In connection with the LEAP grant, the application is approved by the Department, the City Manager of the City of Norco, is authorized to enter into, execute, and deliver on behalf of the City of Norco a State of California Standard Agreement for the amount of $149,500 and any and all other documents required, or deemed necessary, or appropriate, to evidence and secure the LEAP grant, the Applicant’s obligation related thereto, and all amendments thereto collectively, the LEAP Grant Documents;

Page 214 of 314 ends

Resolution No. 2022-16 – LEAP Grant Award

Page 2 ends

March 2, 2022
SECTION 3. The City of Norco shall be subject to the terms and conditions as specified in the NOFA and Standard Agreement, provided by the Department with the approval. The City of Norco and any and all accompanying documents are incorporated in full and as part of the Standard Agreement. Pursuant to the NOFA and in conjunction with the terms of the Standard Agreement, the Applicant hereby agrees to use the funds for eligible uses and allowed expenditures in the manner presented and specifically identified in the approved Application. Any and all activities funded, information provided, and timelines represented in the Application will be enforced through a fully executed Standard Agreement.

PASSED AND ADOPTED by the City Council of the City of Norco, California, at a regular meeting held on March 2, 2022.
_______________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
________________________
Dana Roa, CMC, City Clerk
City of Norco, California
I, DANA ROA, CMC, City Clerk of the City of Norco, California do hereby certify that the foregoing Resolution was introduced and adopted by the City Council of the City of Norco, California, at a regular meeting thereof held on March 2, 2022 by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Norco, California on March 2, 2022. ________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 215 of 314 ends

City Council

STAFF REPORT
Date: March 2, 2022 Agenda Item:

2.H.

To: Honorable Mayor and City Council Members
Prepared By: Lisette Free, Finance Director
Department: Finance
SUBJECT:

Fiscal Year 2021-2022 Second Quarter Budget Performance Report RECOMMENDATION:

Receive and file the Fiscal Year 2021-2022 Second Quarter Budget Performance Report.

SUMMARY:

One of the Department’s annual goals is to timely inform the City Council on actual operating budget results relative to the annual adopted budget. This report provides information on how actual results through December 31, 2021, compared to the adopted budget. Any significant variances identified as a result of reviewing/analyzing the budget performance through December 31, 2021 have been recommended as a mid-year budget amendment. This report also provides budget to actual information on the City’s five Landscape Maintenance Districts.

BACKGROUND:

As part of revenue and expenditure reporting and monitoring program, staff has provided the City Council with quarterly budget performance reports since Fiscal Year 2004. This report provides information as of the second quarter ended December 31, 2021. As a result of timing differences, the first six months of actual recorded data may not serve as accurate prediction of what the year-end numbers are likely to be at June 30, 2022. For example, traditionally the majority of property taxes, sales taxes and franchise fees are received during the second half of the fiscal year. With this in mind, these numbers have been analyzed in conjunction with other historic and currently available data through the first week in February in order to identify material variances with the adopted budget.

Attachment A provides a summary of revenues and expenditures for each operating fund through December 31, 2021.

General Fund Revenues

Page 216 of 314 ends

Including the effects of timing differences, the following variances have been identified between adopted budget and actual results through December 31, 2021. These variances are being incorporated as part of the mid-year budget amendments. • Property Tax: The low percentage of property tax revenue received as of December 31, 2021, is due to the uneven distribution of property tax receipts during the fiscal year. The bulk of property tax revenues are received in the months of January and May of each year. Based on the most recent assessed value information made available by the County in October 2021, it is anticipated that property tax revenue will be higher by year-end due to increase in residual tax increment. An appropriate budget adjustment has been recommended. • Sales Tax: Sales tax revenue for FY 2021-2022 budget year was estimated with the Coronavirus pandemic impact in mind. Despite the coronavirus pandemic, the City saw significant growth in Sales Tax during FY 2020-2021. Early FY 2021-2022 data suggests that the strong growth in sales tax revenue experienced during FY 2020-2021 is continuing. So, the outlook in FY 2021-2022 is favorable as the impacts on city revenues from the coronavirus pandemic continues to diminish.

Through the month of November 2021, actual Sales Tax receipts totaled $4,207,350. An appropriate budget adjustment has been recommended. • Motor Vehicle In-Lieu Fees (MVLF): In 2004, the Legislature permanently reduced the VLF tax rate and eliminated state general fund backfill to cities and counties. Instead, cities and counties now receive additional transfers of property tax revenues in lieu of VLF. Annually, half of the first installment of the replacement property tax is received during the first week of February 2022. Based on the amount of the first installment receipt, MVLF actual receipts are expected to be higher than budget due to growth in assessed valuation. An appropriate adjustment has been recommended for mid-year budget adjustment. • Other Taxes: The other taxes category includes public safety sales tax, property transfer tax, transient occupancy tax and business license tax. Total revenue for this category is tracking slightly ahead of budget due to better than anticipated performance in public safety sales tax, property transfer tax and transient occupancy tax. The property transfer tax increase is due to higher sales values and the red-hot real estate market. Transient occupancy tax increased as travel restrictions due to the Coronavirus pandemic were lessened. Recommended adjustments have been included in the mid-year budget amendment report. • Franchise Fees: Significant amount of the revenues in this category are from electric and gas franchises fees which are received once a year. The City receives payment for electric and gas franchise fees in April. Refuse franchise revenues are received monthly while cable television franchises are received quarterly. Overall revenue projections for this category are expected to be slightly higher than the adopted budget due to increased cable and refuse franchise receipts.

Recommended adjustments have been included in the mid-year budget amendment report.
• Fines and Penalties: This revenue category includes vehicle code violation fines, parking citations and abandoned vehicle impound fees. Based on actual receipts

Page 217 of 314 ends

through December 31, 2021, this revenue category is anticipated to be slightly less than budgeted due to decreased municipal code violation revenues. An appropriate adjustment is being incorporated into the mid-year budget adjustments.
• Community Development Fees: Community development fees consist of planning, building and safety, and engineering fees. Planning, building and engineering revenues are anticipated to be higher than budgeted due to building and safety fees related to the development by CapRock for the Saddle Ranch and Palomino projects and the anticipation of the development of a hotel by year end.

Appropriate adjustments are being incorporated into the mid-year budget. • Community Services: This category includes recreation activities fees, facilities rentals, Wee-People Program and revenues related to special events. Overall revenue projection for this category is expected to increase by $67,679 as restrictions are lifted from the Coronavirus pandemic.

General Fund Expenditures
Overall General Fund expenditures are tracking to the adopted budget. As shown on Attachment A, expenditures in the Sheriff’s and Fire Departments are below budget as of December 31, 2021, because County billing for contract services usually lag behind by at least 45 days for police services and three or more months for fire services. Cal Fire costs are billed and paid on a quarterly basis.

The Sheriff’s costs are billed and paid on a monthly basis. The first payment for the Sheriff’s Department was paid in September 2021. The cost for the department is largely determined based on Riverside County law enforcement contract rates. At the time the FY 2021-2022 budget was approved, the contract rate was estimated at 5.25% increase.

The County now believes that the contract rate will decrease to 4.12%. This reduction in rate is expected to generate a cost reduction from the adopted budget. However, staff is recommending a Dedicated Traffic Deputy towards the end of the fiscal year. The additional cost will be funded by the projected savings from lower contract rates.

American Rescue Plan Act (ARPA)
The American Rescue Plan Act Fund was adopted by the City Council on October 20, 2021. ARPA provides Coronavirus State and Local Fiscal Recovery Funds (CSLFRF) to all cities in the United States. The purpose of the funding is to help cities respond and recover from the health and economic impacts from the world-wide Coronavirus Pandemic (COVID-19). City Council approved FY 2021-2022 appropriation in the amount of $3.2 million from the City's total allocation of $6.4 million. The remaining funds will be appropriated in future fiscal years. In addition, the City Council approved additional appropriation from ARPA funds on December 15, 2021, to provide emergency clean up and environmental observation of work to be performed at the Santa Ana River homeless encampments. Overall, ARPA expenditures are tracking to the adopted budget.

It is important to note because the City’s allocation of ARPA funds is less than $10 million, Department of Treasury Regulations allows the City to use all of its allocation as lost revenue replacement. This allows the City Council to appropriate ARPA funds for any legal government purpose except those that are prohibited. To provide flexibility to the City Council in the way these funds are used, the City will be treating all of its allocation as lost revenue replacement.

Page 218 of 314 ends

Measure R Fund
The second quarter budget to actual budget performance report for Measure R Fund was approved by the Measure R Citizens’ Oversight Committee (COC) on January 26, 2022 and presented to City Council to receive and file as part of this agenda item (see Attachment B).

Water and Sewer Funds Revenues and Expenditures
A review of Water Fund actual revenues through January 2022, indicates that total revenues are tracking slightly less than the original budget estimates. Expenditures are tracking according to the approved expenditure budget. Water revenue trends tend to be at their highest in the fall months due to hotter weather while revenue trends decrease in the spring months. Staff is recommending a decrease of $440,813 to Water Fund revenues due to lower consumption and extension of shut-offs moratorium by the State.

Sewer Fund revenues which primarily consists of fixed charges were also reviewed through January 2022 and determined to be slightly less than the original budget estimates by $122,231. Similarly, expenditures are tracking in line with budget.

Other City Funds
This second quarter report also provides summary information on CDBG, Gas Tax, NPDES and Miscellaneous Grant Funds. NPDES expenditures are tracking to budget.

NPDES revenues have not been received as of December 2021 due to the timing of property tax payments from the County.

Over the last few years, Gas Tax Fund has been delayed with the majority of the receipts received in the second half of the fiscal year. In late January, the City received revised gas tax revenue estimates from the State indicating that projected receipts will be slightly more than the adopted budget due to the lifting of restrictions related to the Coronavirus pandemic.

Landscape Maintenance Districts
Through meetings and other discussions with residents of Landscape Maintenance Districts (LMDs) in 2012, it was agreed between staff and residents that quarterly budget to actual reports on the LMDs would help residents to better understand how LMD assessment receipts are expended. Attachment A (starting on page 4) provides a budget to actual comparison of each district’s revenues and expenditures through December 31, 2021. The quarterly budget to actual report is also intended to assist staff to better monitor and control costs to ensure expenditures are within amounts approved and levied to homeowners.

As of December 31, 2021, no revenues have been received for any of the districts. The first installment of the assessments was received during the last week of January 2022.

Based on the amounts received for the first installment for each of the districts, staff believes that budgeted revenue numbers would be achieved by the end of the fiscal year.

Actual expenditure amounts shown for each district represent costs that have been paid through December 31, 2021. These costs are typically lower than actual costs incurred due to the time lag between when services are provided by contractors and the time their invoices are submitted and paid. In July 2019, a Proposition 218 Public Hearing was held resulting in a majority protest from LMD #2 property owners. For LMD #2, the budget

Page 219 of 314 ends

eliminated all parkway maintenance, the slope maintenance along Norco Hills Road, and all trail fence replacement but repays the City the deficit funded by the City over the next six years. However, since the budget was approved, City Council has authorized expending funds to provide essential maintenance above the amount of revenues estimated to be derived from the district. These actions will continue to result in City funds being used to cover the revenue shortfall in the district.

Staff have met with City Engineer to discuss the feasibility of a Proposition 218 Public Hearing prior to the approval of Engineer’s estimate for FY 2022-2023. Based on insufficient cost data, time constraints and other logistical issues, it has been determined that a Proposition 218 Public Hearing should be deferred until next year to allow sufficient time to address these issues.

FISCAL IMPACT:

This report is informational. Budget changes identified as a result of the second quarter budget to actual review are being included in the mid-year budget amendment staff report.

RELATIONSHIP TO STRATEGIC PLAN:

The Second Quarter Report is consistent with Strategic Direction #3 – Economic Development and Financial Stability “Assure financial stability by expanding economic development, diversifying revenue sources and continuing prudent financial management.”
REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Lisette Free, Finance Director Approved by: Andy Okoro, City Manager
Approved as to Form: John Harper, City Attorney
ATTACHMENT(S):

Attachment A
Attachment B

Page 220 of 314 ends

Attachment A Page 1
City of Norco
General Fund Budget to Actual
Second Quarter Budget Performance Ending December 31, 2021 Amended
Adopted Budget 12/31/2021 Remaining %
General Fund Budget as of 12/31 Actual Budget Achieved

REVENUES
Property Taxes 2,268,055 $ 2,268,055 $ 533,809 $ 1,734,246 $ 24% Sales Taxes 8,528,389 8,528,389 3,344,488 5,183,901 39% Motor Vehicle License Fees 3,022,043 3,022,043 - 3,022,043 0% Other Taxes 1,678,615 1,678,615 1,050,838 627,777 63%
Franchise Fees 1,956,901 1,956,901 603,092 1,353,809 31% Intergovernmental 300 300 290 10 97%
Fines and Penalties 249,346 249,346 113,073 136,273 45% Interest/Lease Income 971,498 971,498 327,730 643,768 34% Community Development Fees 1,609,278 1,609,278 1,676,147 (66,869) 104% Community Services/Recreation 625,206 625,206 419,399 205,807 67% Other Revenues 1,309,524 1,309,524 1,983,975 (674,451) 152% Administrative Overhead/Operating Transfers 1,580,032 1,580,032 185,484 1,394,548 12% Total Revenues 23,799,187 $ 23,799,187 $ 10,238,324 $ 13,560,863 $ 43%

EXPENDITURES
Sheriff 7,020,789 $ 5,970,789 $ 892,867 $ 5,077,922 $ 13% Citizens on Patrol 17,576 17,576 4,105 13,471 23%
Crossing Guards 54,000 54,000 19,469 34,531 36%
Total Sheriff Protection 7,092,365 6,042,365 916,441 5,125,924 13% Fire Suppression & EMS (CalFire) 4,311,568 3,311,568 63,174 3,248,394 1% Norco Animal Rescue Team 18,230 18,230 10,976 7,254 60% Total Fire 4,329,798 3,329,798 74,150 3,255,648 2%
Recreation 966,808 966,068 548,792 417,276 57%
Special Events 100,254 100,254 38,984 61,270 39%
Youth & Teen 376,073 376,073 122,515 253,558 33%
Senior Citizens 193,031 193,031 76,167 116,864 39%
Senior-RCTC 42,269 42,269 14,664 27,605 35%
Total Community Services 1,678,435 1,677,695 801,121 876,574 48% Animal Control 796,795 796,795 369,595 427,200 46%
Non-Departmental 3,430,267 3,230,324 1,942,251 1,288,073 57% City Clerk 452,864 452,864 229,859 223,005 51%
City Manager 547,404 547,404 274,568 272,836 50%
Human Resources 213,172 213,172 87,771 125,401 41%
Economic Development 210,010 210,010 38,786 171,224 18% Fiscal & Support Services 765,877 765,877 311,459 454,418 41% Total Admin, Econ. Dev & Finance 2,189,327 2,189,327 942,443 1,246,884 43% City Council 103,271 103,271 39,967 63,304 39%
City Attorney 250,000 250,000 97,282 152,718 39%
Total City Council & City Attorney 353,271 353,271 137,249 216,022 39% Engineering 357,608 357,608 104,522 253,086 29%
Inspection 20,592 20,592 7,359 13,233 36%
Parkway Maintenance 94,106 94,106 27,986 66,120 30%
Total Public Works & Engineering 472,306 472,306 139,867 332,439 30% Code Enforcement 201,755 201,755 86,414 115,341 43%
Building & Safety 831,287 831,287 273,904 557,383 33%
Community Development 681,847 681,847 252,607 429,240 37% Total Plan., Bldg. Safety & Code 1,714,889 1,714,889 612,925 1,101,964 36% Park Maintenance 933,289 1,105,412 383,617 721,795 41%
Public Buildings 1,485,575 1,513,703 780,893 732,810 53% Total Facilities and Maintenance 2,418,864 2,619,115 1,164,510 1,454,605 48% Total Expenditures 24,476,317 $ 22,425,885 $ 7,100,552 $ 15,325,333 $ 29% Revenues Over (Under) Expenditures (677,130) $ 1,373,302 $ 3,137,772 $ (1,764,470) $

Page 221 of 314 ends

Attachment A Page 2
City of Norco
Schedule of American Resuce Plan Act Revenues & Expenditures Second Quarter Budget Performance Ending December 31, 2021 Amended 12/31/2021 %
American Rescue Plan Act (ARPA) Budget Actual Achieved
Revenues:

ARPA Revenues 3,173,559 $ 3,082,373 $ 97%
Interest Income - 1,906 NA
Total Revenues 3,173,559 $ 3,084,279 $ 97%
Expenditures:

Covid-19 Related Salaries 35,000 $ 9,633 $ 28%
Unemployment 12,628 - 0%
Special Departmental 30,300 456 2%
CalFire Contractual Services 1,000,000 1,000,000 100%
Law Enforcement Contractual Services 1,050,000 1,050,000 100% Utility Subsidy Program 250,000 102,144 41%
Homeless Programs and Services 349,631 46,688 13%
ARPA Additional Relief for Utility Billing 100,000 - 0% Small Business Grant Program 250,000 70,000 28%
Equipment 96,000 31,948 33%
Total Expenditures 3,173,559 $ 2,310,869 $ 73%
Revenues Over (Under) Expenditures $ - $ 773,410

Page 222 of 314 ends

Attachment A Page 3
City of Norco
Schedule of Other Funds Revenues & Expenditures
Second Quarter Budget Performance Ending December 31, 2021 Amended 12/31/2021 %
Fund Description Budget Actual Achieved

WATER FUND
Revenues $ 13,651,449 $ 6,194,909 45%
Expenditures 12,533,600 5,105,784 41%
Revenues Over (Under) Expenditures 1,117,849 $ 1,089,125 $

SEWER FUND
Revenues $ 7,837,573 $ 3,512,317 45%
Expenditures 6,812,371 3,344,598 49%
Revenues Over (Under) Expenditures 1,025,202 $ 167,719 $

GAS TAX
Revenues $ 671,959 $ 272,314 41%
Expenditures 698,105 164,389 24%
Revenues Over (Under) Expenditures (26,146) $ 107,925 $

NPDES FUND
Revenues $ 135,000 $ - 0%
Expenditures 183,771 65,968 36%
Revenues Over (Under) Expenditures (48,771) $ (65,968) $ CDBG
Revenues $ 171,727 $ - 0%
Expenditures 171,727 12,300 7%
Revenues Over (Under) Expenditures $ - $ (12,300)

MISCELLANEOUS GRANTS
Revenues $ 544,503 $ 12,692 2%
Expenditures 544,503 65,026 12%
Revenues Over (Under) Expenditures - $ (52,334) $

SUPPLEMENTAL LAW ENFORCEMENT
Revenues $ 100,000 $ 81,727 82%
Expenditures 100,000 81,727 82%
Revenues Over (Under) Expenditures - $ - $

Page 223 of 314 ends

Attachment A Page 4
City of Norco
Schedule of Landscape Maintenance District Revenues & Expenses Second Quarter Budget Performance Ending December 31, 2021 Amended 12/31/2021 %
Landscape Maintenance District #1 Budget Actual Achieved Revenues:

LMD #1 Assessments 10,607 $ - $ 0%
Interest Income - - NA
Total Revenues 10,607 $ - $ 0%
Expenditures:

Observation 3,345 $ 710 $ 21%
Water Charges 4,000 1,701 43%
Electricity Charges 349 65 19%
Telephone Charges 200 102 51%
Landscape Maintenance 2,989 743 25%
Contractual 1,400 836 60%
Administrative Overhead 537 294 55%
Admin Fees-Property Taxes 150 - 0%
Incidentals 400 - 0%
Fuel - 47 NA
Total Expenditures 13,370 $ 4,497 $ 34%
Revenues Over (Under) Expenditures $ (2,763) $ (4,497)
Fund Balance:

Ending Fund Balance June 30, 2021 2,471 $

Page 224 of 314 ends

Attachment A Page 5
City of Norco
Schedule of Landscape Maintenance District Revenues & Expenses Second Quarter Budget Performance Ending December 31, 2021 Amended 12/31/2021 %
Landscape Maintenance District #2 Budget Actual Achieved Revenues:

LMD #2 Assessments 159,058 $ - $ 0%
Interest Income - (35) NA
Transfers In 77,161 - 0%
Total Revenues 236,219 $ (35) $ 0%
Expenditures:

Observation 17,927 $ 3,549 $ 20%
Tree Replacement 3,000 - 0%
Equestrian Trails 41,948 10,426 25%
Water Charges 31,269 11,653 37%
Electricity Charges 1,500 837 56%
Telephone Charges 206 - 0%
Landscape Maintenance 27,059 4,778 18%
Wet Lands Area 534 - 0%
Park Maintenance 9,614 2,389 25%
Contractual 3,000 1,078 36%
Administrative Overhead 7,340 3,972 54%
Admin Fees-Property Taxes 242 - 0%
Incidentals 1,000 9 1%
Fuel - 234 NA
Operating Contingency 2,459 - 0%
Land Improvements - Construction 60,000 - 0%
Storm Sewer Lines - Construction 20,000 - 0%
Total Expenditures 227,098 $ 38,923 $ 17%
Revenues Over (Under) Expenditures 9,121 $ (38,958) $
Fund Balance:

Ending Fund Balance June 30, 2021 (38,811) $

Page 225 of 314 ends

Attachment A Page 6
City of Norco
Schedule of Landscape Maintenance District Revenues & Expenses Second Quarter Budget Performance Ending December 31, 2021 Amended 12/31/2021 %
Landscape Maintenance District #3 Budget Actual Achieved Revenues:

LMD #3 Assessments 89,201 $ - $ 0%
Interest Income - 5 NA
Total Revenues 89,201 $ 5 $ 0%
Expenditures:

Observation 13,137 $ 2,839 $ 22%
Equestrian Trails 6,579 1,638 25%
Tree Replacement 2,000 - 0%
Water Charges 37,721 18,514 49%
Electricity Charges 1,200 464 39%
Telephone Charges 65 - 0%
Landscape Maintenance 31,995 7,954 25%
Contractual 2,575 788 31%
Administrative Overhead 5,068 2,532 50%
Admin Fees-Property Taxes 266 - 0%
Incidentals 1,000 - 0%
Fuel - 187 NA
Operating Contingency 3,182 - 0%
Total Expenditures 104,788 $ 34,915 $ 33%
Revenues Over (Under) Expenditures (15,587) $ (34,910) $ Fund Balance:

Ending Fund Balance June 30, 2021 12,485 $

Page 226 of 314 ends

Attachment A Page 7
City of Norco
Schedule of Landscape Maintenance District Revenues & Expenses Second Quarter Budget Performance Ending December 31, 2021 Amended 12/31/2021 %
Landscape Maintenance District #4 Budget Actual Achieved Revenues:

LMD #4 Assessments 461,877 $ - $ 0%
Interest Income - 201 NA
Total Revenues 461,877 $ 201 $ 0%
Expenditures:

Observation 23,462 $ 5,548 $ 24%
Equestrian Trails 82,725 20,561 25%
Tree Replacement 5,000 - 0%
Water Charges 118,786 64,183 54%
Electricity Charges 7,827 2,702 35%
Telephone Charges 739 96 13%
Landscape Maintenance 151,228 28,518 19%
Natural Open Space 13,525 11,970 89%
Wet Lands Area 5,499 - 0%
Park Maintenance - 15,383 NA
Contractual 3,708 969 26%
Administrative Overhead 30,724 15,360 50%
Admin Fees-Property Taxes 401 - 0%
Incidentals 5,000 1,859 37%
Fuel - 327 NA
Operating Contingency 15,413 - 0%
Storm Sewer Lines 20,000 - 0%
Total Expenditures 484,037 $ 167,477 $ 35%
Revenues Over (Under) Expenditures $ (22,160) $ (167,276) Fund Balance:

Ending Fund Balance June 30, 2021 352,538 $

Page 227 of 314 ends

Attachment A Page 8
City of Norco
Schedule of Landscape Maintenance District Revenues & Expenses Second Quarter Budget Performance Ending December 31, 2021 Amended 12/31/2021 %
Landscape Maintenance District #5 Budget Actual Achieved Revenues:

LMD #5 Assessments 60,838 $ - $ 0%
Interest Income - 85 NA
Total Revenues 60,838 $ 85 $ 0%
Expenditures:

Observation 10,055 $ 2,129 $ 21%
Equestrian Trails 8,340 2,070 25%
Tree Replacement 500 - 0%
Water Charges 10,564 5,859 55%
Electricity Charges 621 380 61%
Telephone Charges 68 - 0%
Landscape Maintenance 16,674 1,614 10%
Park Maintenance - 2,532 NA
Contractual 2,575 751 29%
Administrative Overhead 2,956 1,476 50%
Admin Fees-Property Taxes 253 - 0%
Incidentals 1,000 - 0%
Fuel - 140 NA
Operating Contingency 3,566 - 0%
Storm Sewer Lines 20,000 - 0%
Total Expenditures 77,172 $ 16,951 $ 22%
Revenues Over (Under) Expenditures (16,334) $ (16,866) $ Fund Balance:

Ending Fund Balance June 30, 2021 139,764 $

Page 228 of 314 ends

Measure R Citizens' Oversight
Committee

STAFF REPORT
Date: January 26, 2022 Agenda Item:

1.B.

To: Honorable Chair and Committee Members
Prepared By: Lisette Free, Finance Director
Department: Finance
SUBJECT:

Fiscal Year 2021-2022 Second Quarter Measure R Budget Performance Report RECOMMENDATION:

Receive and File the Fiscal Year 2021-2022 Second Quarter Measure R Budget Performance Report and recommend transmittal to the City Council SUMMARY:

One of the Department’s annual goals is to timely inform the Measure R Citizen’s Committee (“Committee”) on actual operating budget results relative to Measure R’s annual adopted budget. This report provides information on how actual results through December 31, 2021, compared to the adopted budget. Any significant variances identified as a result of reviewing/analyzing the budget performance through December 31, 2021 have been recommended as a mid-year budget amendment.

BACKGROUND:

As part of revenue and expenditure reporting and monitoring program, staff has provided the Committee with quarterly budget performance reports. This report provides information as of the second quarter ended December 31, 2021. As a result of timing differences, the first six months of actual recorded data may not serve as accurate prediction of what the year-end numbers are likely to be at June 30, 2022. With this in mind, these numbers have been analyzed in conjunction with other historic and currently available data in order to identify material variances with the adopted budget. This is the third full year of Measure R.

Attachment A provides a summary of revenues and expenditures for each of Measure R approved projects through December 31, 2021. Attachment B provides a summary of the project's budget performance from inception through December 31, 2021.

Attachment B

Page 229 of 314 ends

As part of this review, transactions and use tax revenue has also been revised based on the amount received year-to-date and the estimated amount yet to be received for the remainder of the FY 2021-2022. At the beginning of the fiscal year, total Measure R revenues was estimated at $5,867,000. When the budget was developed in June, there was significant uncertainty regarding the potential impact of the coronavirus pandemic on revenue. Despite the coronavirus pandemic, the City saw significant growth in Measure R transaction and use tax during FY 2020-2021. Early FY 2021-2022 data suggests that the strong growth in sales tax revenue experienced during FY 2020-2021 is continuing.

So, the outlook in FY 2021-2022 is favorable as the impacts on city revenues from the coronavirus pandemic continues to diminish. Through the month of October 2021, actual Measure R Transactions and Use Tax receipts totaled $2,656,165. Based on actual receipts through October 2021, staff is revising estimated revenue from $5,867,000 to $7,968,496, representing an increase of $2,101,496.

FISCAL IMPACT:

This report is informational. Budget changes identified as a result of the second quarter budget to actual review are being included in the mid-year budget amendment staff report.

RELATIONSHIP TO STRATEGIC PLAN:

This item is consistent with Strategic Directive No. 3 - Assure financial stability by identifying new revenue sources and continuing prudent financial management.

REVIEWED AND APPROVED BY:

ATTACHMENT(S):

Attachment A - Measure R 2nd Qtr Budget to Actual Report Attachment B - Measure R 2nd Qtr Project Life-to-Date Status

Page 230 of 314 ends

Attachment A
Revenue Description
FY 2021-2022
Approved
Budget
FY 2021-2022
Amended
Budget
FY 2021-2022
Actual as of
12/31/21
% of
Budget
Budget
Remaining
Revenues
Estimated Measure R Tax Revenues 5,867,000 $ 5,867,000 $ 2,656,165 $ 45% (3,210,835) $ Investment Earnings 90,762 90,762 6,114 7% (84,648)
Total Revenues 5,957,762 $ 5,957,762 $ 2,662,279 $ 45% (3,295,483) $ Expenditures
Operating and Maintenance
Trail System Maintenance $ 567,000 $ 567,000 $ 215,536 38% $ 351,464 Committee Stipends 1,400 1,400 - 0% 1,400
Professional Services 10,000 10,000 - 0% 10,000
Street Maintenance 250,000 250,000 137,621 55% 112,379
Subtotal 828,400 828,400 353,157 43% 475,243
Carryover Projects
Animal Control, Parmenter Park, Wayne Makin Parking Lots 285,867 272,673 67,448 25% 205,225 City Hall/Sheriff Sub-Station Improvements 236,050 238,794 - 0% 238,794 Citywide ADA Assessment 122,852 67,575 1,240 2% 66,335
Citywide HVAC/EVC Project 279,294 309,441 225,140 73% 84,301 Citywide Urban Forest Tree Planting Program 79,000 69,843 3,792 5% 66,051 Moreno Arena Sound System 130,000 130,000 - 0% 130,000
Nellie Weaver Hall Improvements 539,000 538,350 47,940 9% 490,410 Playground Replacement Project 100,844 310,672 - 0% 310,672 Pole Barns 972,391 955,844 13,680 1% 942,164
Riley Gym Improvements 448,805 555,146 7,526 1% 547,620 Riley Gym, Community Center, Scott House Parking Lots 146,077 296,828 106,918 36% 189,910 River Road Parkway Improvement Project 100,000 310,287 4,796 2% 305,491 Santa Ana River Trail Project 201,457 201,458 - 0% 201,458 Trail Fence Replacement - Various Locations 600,000 833,484 675 0% 832,809 Valley View Pavement Project 1,063,437 1,030,641 - 0% 1,030,641 Subtotal 6,121,036 5,305,074 479,154 8% 5,641,882
New Projects/Programs
Citywide ADA Improvement Project 200,000 200,000 - n/a 200,000 Citywide Facility Painting and Treating 150,000 150,000 - 0% 150,000 Citywide Flooring 200,000 200,000 - 0% 200,000
Citywide Irrigation System Upgrade 210,000 210,000 - 0% 210,000 Citywide Park Enhancements 510,000 510,000 5,760 1% 504,240 Dales and Parkridge Pavement Project 630,000 630,000 29,002 5% 600,999 Hillside Ave Pavement Project 910,000 910,000 700 0% 909,300 Second Street Pavement Project - East Side 1,000,000 1,000,000 - 0% 1,000,000 Shadow Canyon Circle Pavement Project 460,000 460,000 12,063 3% 447,937 Third Street Payment Project 860,000 860,000 15,080 2% 844,920 Various Minor Street Pavement Projects 330,000 330,000 9,521 3% 320,479 Wayne Makin/Shearer Master Plan 50,000 50,000 325 1% 49,675 Subtotal 5,510,000 5,510,000 72,451 1% 5,437,549
Total Expenditures 11,643,474 $ 12,459,436 $ 904,763 $ 7% 11,554,673 $ Revenues Over (Under) Expenditures (6,501,674) $
Beginning Fund Balance, July 1, 2021 9,925,563
Estimated Ending Fund Balance, June 30, 2022 3,423,889 $ FY 2021-2022 2nd Quarter Budget to Actual Report
Measure R Transactions and Use Tax

Page 231 of 314 ends

Attachment B
Projects
Total Approved
Budget
Prior
Expenditures as
of 06/30/21
FY 2021-2022
Actual as of
12/31/21
Total
Expenditures as
of 12/31/21
Budget
Remaining
Carryover Projects
Animal Control, Parmenter Park, Wayne Makin Parking Lots 286,230 13,557 67,448 81,005 205,225 City Hall/Sheriff Sub-Station Improvements 255,000 16,206 - 16,206 238,794 Citywide ADA Assessment 273,005 205,430 1,240 206,670 66,335 Citywide HVAC/EVC Project 394,086 84,645 225,140 309,785 84,301 Citywide Urban Forest Tree Planting Program 82,000 12,157 3,792 15,949 66,051 Moreno Arena Sound System 130,000 - - - 130,000
Nellie Weaver Hall Improvements 539,000 650 47,940 48,590 490,410 Playground Replacement Project 312,424 1,752 - 1,752 310,672 Pole Barns 1,068,750 112,906 13,680 126,586 942,164
Riley Gym Improvements 576,007 20,861 7,526 28,387 547,620 Riley Gym, Community Center, Scott House Parking Lots 620,000 323,172 106,918 430,090 189,910 River Road Parkway Improvement Project 323,000 12,713 4,796 17,509 305,491 Santa Ana River Trail Project 201,600 142 - 142 201,458 Trail Fence Replacement - Various Locations 1,290,000 456,516 675 457,191 832,809 Valley View Pavement Project 1,100,000 69,359 - 69,359 1,030,641 Subtotal 1,330,066 7,451,102 479,154 1,809,220 5,641,882 New Projects/Programs
Citywide ADA Improvement Project 200,000 - - - 200,000
Citywide Facility Painting and Treating 150,000 - - - 150,000 Citywide Flooring 200,000 - - - 200,000
Citywide Irrigation System Upgrade 210,000 - - - 210,000 Citywide Park Enhancements 510,000 - 5,760 5,760 504,240 Dales and Parkridge Pavement Project 630,000 - 29,002 29,002 600,999 Hillside Ave Pavement Project 910,000 - 700 700 909,300 Second Street Pavement Project - East Side 1,000,000 - - - 1,000,000 Shadow Canyon Circle Pavement Project 460,000 - 12,063 12,063 447,937 Third Street Payment Project 860,000 - 15,080 15,080 844,920 Various Minor Street Pavement Projects 330,000 - 9,521 9,521 320,479 Wayne Makin/Shearer Master Plan 50,000 - 325 325 49,675 Subtotal - 5,510,000 72,451 72,451 5,437,549
Total Expenditures 12,961,102 $ 1,330,066 $ 551,606 $ 1,881,672 $ 11,079,430 $ Measure R Transactions and Use Tax
FY 2021-2022 2nd Quarter Project Life-to-Date Status

Page 232 of 314 ends

City Council

STAFF REPORT
Date: March 2, 2022 Agenda Item:

5.A.

To: Honorable Mayor and City Council Members
Prepared By: Dana Roa, City Clerk
Department: City Clerk
SUBJECT:

Review of Rules of Procedure for City Council Meetings.

RECOMMENDATION:

Review City Council Meetings Rules of Procedure and provide feedback or changes as appropriate.

SUMMARY:

The rules and regulations for City Council meetings are amended from time-to-time in order to provide guidelines for the conduct of the public business by, or on behalf of, the City Council.

BACKGROUND:

On August 4, 2021, Council Member Kevin Bash requested that a discussion be brought back to City Council related the process for the Mayor to add items to the agenda.

The Rules of Procedure currently state:

B. SUBMISSION OF AGENDA ITEMS:

Items placed on the agenda shall be requested by a City Council Member or City Staff. Deadlines for placing items on the City Council agenda will be set and determined by the City Manager. A City Council Member wishing to place a matter on a future City Council agenda shall first obtain majority approval of the City Council.

Likewise, any City Council Member wishing to refer a matter to a Commission shall obtain majority approval of the City Council before the matter may be agendized by the Commission. Majority approval shall be obtained at the request of a City Council Member during the “City Council/City Manager/Staff Communications” portion of the City Council agenda and while the matter may be described, there may be no substantive discussion of the matter by the City Council.

Page 233 of 314 ends

The City Clerk sent out a survey question through the City Clerk List Serve asking for Cities to provide feedback on how items are placed on the agenda in their Cities. 22 Cities provided their answers (Attachment A). The majority answer was that the Mayor and all Council Members have the ability to add items to the agenda with a quorum vote of their peers, no one individual is authorized to add items on their own. This is in line with our current practice of adding items to the agenda.

The City Clerk has provided information for the City Council to review and determine if the Rules of Procedures should be amended at this time. If it is determined that changes are to be made a Resolution will be brought back to City Council for final approval.

FISCAL IMPACT:

None.

RELATIONSHIP TO STRATEGIC PLAN:

Strategic Direction #2: Engage with the community through excellent customer services, communication and programs.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Lisette Free, Finance Director Approved by: Andy Okoro, City Manager
Approved as to Form: John Harper, City Attorney
ATTACHMENT(S):

Exhibit A

Page 234 of 314 ends

Exhibit A
City Rules of Procedure - Adding Items to Agenda
Alisa Viejo 1. Placing an Item on the Agenda by a City Council Member. a. Any City Council Member may place an item on a future Agenda when stated under the “Council Announcements/Council
Comments/Committee Updates” Section, and upon direction of City Council, Staff shall prepare staff reports and/or written recommendations on items placed on the agenda by individual City Council Members.
b. The City Council Member may add an item to the Agenda at any time as long as the Agenda procedures are followed. Staff shall not prepare staff reports or written recommendations on items placed on the agenda by individual City Council Members, but shall include as part of the agenda any materials submitted by the individual City Council Member.

Chico Process requires a vote of the Council to add the discussion item to the agenda. On our agenda we have an item that is “Councilmember requests”. Any Councilmember can request that an item be agendized.

At that point the Council will vote whether or not the item will be added to the agenda at a future date.

Chula Vista 1. At a City Council Meeting. Since a majority of the Council must act collectively to place an item on the agenda; the preferred method of doing so would be to take action at an open meeting. The Council can vote at a City Council meeting to place an item on the agenda for an upcoming meeting. This method insures that the action complies with the Brown Act, and avoids any appearance of impropriety.

2. Outside of a City Council Meeting. Some items of business may be of such an urgent nature that there is not sufficient time to allow a public vote prior to its addition to an agenda. In these circumstances, the City Council members may communicate outside an open meeting for the limited purpose of determining whether a majority of the members agree to add an item to the agenda. No substantive discussions may take place.

Cotati We have a standing agenda item called Direction on Future Agenda Items at each meeting. This allows the Mayor and/or Councilmembers time to make their requests to staff on topics they’d like to see agendized at future meetings. I notate each request in the minutes too.

Fort Bragg City Council. A Councilmember may request that an item be considered on a future agenda and, upon agreement of a majority of Council, staff will prepare a staff report if formal Council action is required. Councilmembers may make this request verbally during a meeting or may submit written requests to the Mayor and/or City Manager. Normally, the process involves two steps: initial consideration of the request by the full Council at the soonest possible regularly scheduled meeting; and, if a majority agrees, the matter will be scheduled for further consideration on an upcoming Council or Council Committee agenda. City Council. A Councilmember may request that an item be considered on a future agenda and, upon agreement of a majority of Council, staff will prepare a staff report if formal Council action is required. Councilmembers may make this request verbally during a meeting or may submit written requests to the Mayor and/or City Manager. Normally, the process involves two steps: initial consideration of the request by the full Council at the soonest possible regularly scheduled meeting; and, if a majority agrees, the matter will be scheduled for further consideration on an upcoming Council or Council Committee agenda.

Fortuna Mayor can request items to be added to the agenda through the City Manager. City Manager approves.

Kingsburg Our Mayor is only ceremonial and doesn’t hold any power above other council members. For any council member to add something to the agenda council has to agree to add it (we have ‘Future Agenda Items” towards the end of our agenda. The Council Member then must research the item and be the sponsor.

Los Angeles The City of LA process is probably unique in the Clerk world. The City of LA has 15 (district) Council members and our Council meetings are Tues, Wed, and Friday at 10am. (For the pandemic, the Friday meetings have been canceled. ) The 15 Councilmembers are in Chambers and are lead by one of the 15 members voted as Council President. (The public is still remote via zoom.) The Mayor is the Executive Branch and does not serve on the Council. (We do not have a City Manager. ) Items are introduced in one of two ways; a report by a Department (including Mayor, City Attorney, or Controller - our Citywide elected offices) is submitted to the Clerk or a motion is made and seconded in Council by members. Reports and motions are referred to Committee to satisfy public hearings and to deliberate but the President of the Council can opt to have any introduced item added to an agenda.

Garden Grove B-1. AGENDA, PREPARATION OF
An agenda shall be prepared for each Regular Meeting containing the specific items of business to be transacted and the order thereof. Items of business may be placed on the agenda by the City Manager, his representative, the City Attorney or by a majority vote of the City Council.

Page 235 of 314 ends

Exhibit A
Irvine The Mayor has the ability to add an item to the agenda on his/her own. Any items initiated by Councilmembers must be done jointly.

Below is an excerpt from our City Council Policies and Procedures manual that speaks to this process. Councilmembers wishing to place items on City Council Agendas shall adhere to the following:
a) All Councilmember initiated items must either be (i) jointly initiated by two Councilmembers, or (ii) initiated by the Mayor. b) Items Not Requiring a Staff Report: Requests shall be presented in a memorandum to the City Manager, with a copy to the Mayor and City Council, no less than one week prior to the next scheduled City Council meeting. c) Items Requiring a Staff Report: Requests shall be presented in a memorandum to the City Manager, with a copy to the Mayor and City Council, no less than two weeks prior to the next scheduled City Council meeting.

Laguna Hills The City Manager determines which items are placed on the agenda and the timing for scheduling such items. Council Members may request items be placed on a future agenda for purposes of discussion, provided at least one other Council Member concurs with the request. All such requests shall be made during the “City Council Member Comments” portion of the City Council agenda. If at least two Council Members, upon consensus, agree to have an item placed on a future agenda, such item shall be placed under the “Matters Agendized and Presented by City Council Members” portion of the City Council agenda on a future agenda for discussion.

Lake Elsinore My Mayor & Council send a request either to me or the City Manager and the two of us discuss if/when it should be agendized and strategize together.

Lake Tahoe Items need to be requested at the end of each meeting with the consent of another Councilmember.

Los Altos Hills We have this provision in our code. Basically any councilmember can add something to the agenda under “Council Initiated.” They then have to get consensus from the majority of the Council before staff will be instructed to work on a topic. The Mayor is elected from the Council and has no added power to add an item to the agenda (other than this Council Initiated provision).

Monrovia Our directly elected Mayor has no greater power than the other ouncilmembers. To add something to an agenda for action, it must be done during a meeting with a majority directing staff to bring an item for consideration at a future meeting. For discussion only items, any member of the City Council, including Mayor, may ask the City Manager to add an item.

Oroville Our city policy is that the Mayor OR 2 council members together can place items on the agenda.

Santa Monica (c) Any Councilmember or the City Manager may direct that any matter within the City Council’s jurisdiction be placed upon the Agenda. Councilmembers should endeavor to submit Councilmember agenda items as follows: (1) for regular meetings, by 3:00 p.m. on Thursday in order to ensure that matters will be agendized for the following Tuesday; and (2) for special meetings, by 3:00 p.m. on the day two days before the day of the special meeting. Subject to Brown Act requirements, items submitted after 3:00 p.m. on the specified day will be agendized for the next regular meeting, unless the Councilmember has identified an urgency requiring that the matter be added to the current agenda.

Sunnyvale Sunnyvale’s Charter Section 616. Proceedings provides the City Manager responsibility for adding items to City Council meeting agendas.

Council Policy 7.3.19 Council Meetings expands authority to the Mayor and a majority of the City Council during a Council meeting. The Mayor and City Council work collaboratively to add items to future Council agendas and discuss the order of items on a particular meeting agenda.

Town of Windsor Any Councilmember may request an agenda item under the Future Agenda Items portion of the Council agenda. If there is no objection, the request will be deemed submitted to the Town Manager for scheduling on a future agenda. If there is an objection to a request, the Councilmember shall make a motion to agendize the requested item for a future meeting. If the motion receives a second, the request will be deemed submitted to the Town manager for scheduling on a future agenda. If the Councilmember believes that the requested item should be scheduled for a specific date, that should be stated as part of the request.

Truckee We have a Mayor Manager form of governance. The mayor is one of five Council members. They all have the ability under Council reports to request an item be placed on a future agenda. They just need a quorum to agree.

Upland We require two Councilmembers (regardless of whether it’s the Mayor or another member) and then the City Manager decides the timeline for placing the item on the agenda.

West Sacramento A council member that has an interest in pursuing an item that will require a significant amount of staff time or other resources should take the following steps:

1. No later than Thursday prior to a council meeting, the council member should advise the City Clerk of the subject matter he/she would like discussed. This may be done in writing or simply through an oral request.

2. Upon receipt of the request, the City Clerk will place the item on the agenda under the heading “Future Agenda Item Requests by Council Members.” If the submitting council member provided supporting information, it will be included in the agenda packet.

3. When the item is considered, the council will take action as to whether staff resources should be further allocated to the matter. If appropriate and approved by the council, the matter may be referred to staff and returned to the council for additional action.

Page 236 of 314 ends

City Council

STAFF REPORT
Date: March 2, 2022 Agenda Item:

5.B.

To: Honorable Mayor and City Council Members
Prepared By: Lisette Free, Finance Director
Department: Finance
SUBJECT:

Fiscal Year 2021-2022 Mid-Year Amendments to the Annual Operating Budget RECOMMENDATION:

Adopt Resolution No. 2022-17, approving various mid-year amendments to the Fiscal Year 2021-2022 annual operating budget and authorizing changes in appropriations and revenues thereto.

SUMMARY:

Staff has completed a mid-year review of the annual operating budget in order to determine appropriate adjustments based on new and/or updated information that were not available when the proposed budget was approved in June 16, 2021. As a result of the mid-year review of the operating budget, staff is recommending that the City Council approve the following changes as outlined in Attachment A:

1. Increase total projected General Fund revenues by $3,196,311

2. Increase total projected General Fund appropriation by $254,932

3. Increase total projected Measure R revenues by $2,101,496

4. Reduce total projected Water Fund revenues by $440,813

5. Reduce total projected Sewer Fund revenues by $122,231

6. Increase total projected Gas Tax revenues by $42,426

7. Increase total projected SB-1 Road Maintenance and Rehabilitation revenues by $88,065

8. Increase total projected Supplemental Law revenues by $61,285 The recommended adjustments will result in a net increase to the previously estimated General Fund reserves amount by $2,941,379 because of $3,196,311 increase in projected revenues and $254,932 increase in projected expenditures during this mid-year budget review. Water Fund working capital estimate is projected to decrease by $440,813 while Sewer Fund working capital estimate is projected to decrease by $122,231. Gas Tax fund balance is estimated to increase by $42,426 as result of projected increase in revenue.

Page 237 of 314 ends

BACKGROUND:

The City’s operating budget for Fiscal Year 2021-2022 was adopted by the City Council on June 16, 2021 for the period from July 1, 2021 through June 30, 2022. American Rescue Plan Act (ARPA) Fund was adopted by the City Council on October 20, 2021.

The proposed mid-year budget adjustments are necessary to reflect information that has become available since the budget was adopted and to incorporate necessary adjustments based on operating results for the first six months of the Fiscal Year.

The recommended operating budget changes are detailed below as follows.

Proposed General Fund Revenue Adjustments:

1. Property Taxes: Property tax revenues are estimated based on the assessed value of taxable real property in the City. The City’s assessed value information was made available by the County in October of 2021 after the budget was adopted. Based on actual tax receipts to date, it is anticipated that total receipts for the fiscal year will be higher than current budget by $43,698 mainly due to better performance from residual tax increment.

2. Sales Tax: Sales tax is a major component of General Fund revenues. At the beginning of the fiscal year, total sales tax revenues was estimated at $8,582,389.

When the budget was developed in June, there was significant uncertainty regarding the potential impact of the coronavirus pandemic on revenue. Despite the coronavirus pandemic, the City saw significant growth in sales tax during FY 2020-2021. Early FY 2021-2022 data suggests that the strong growth in sales tax revenue experienced during FY 2020-2021 is continuing. So, the outlook in FY 2021-2022 is favorable as impacts on sales tax revenues from the coronavirus pandemic continues to diminish. Sales tax revenue is also greatly benefiting from the operations of a national used car dealer that commenced operation in the City earlier than anticipated and is performing better than anticipated when the current budget numbers were developed; and from surging gas prices which has become the second largest revenue contributor. Through the month of November 2021, actual sales tax receipts totaled $4,207,350. Based on actual receipts through November 2021, staff is revising estimated revenue from $8,582,389 to $10,097,640, representing an increase of $1,569,251. This revision is consistent with the recent projection provided by HDL, the City’s sales tax consultant.

3. Other Taxes: General Fund revenues included in this category consist of public safety sales tax, business license tax, transient occupancy tax, property transfer tax and satellite wagering. Based on actual revenues received through January 31, 2022, staff is recommending increasing the amount projected for this revenue category by $583,018 due to better than anticipated performance in public safety sales tax, property transfer tax and transient occupancy tax. The property transfer tax increase is due to the robust real estate market where sales volume and prices have been accelerating. Transient occupancy tax increase is due to recovery in the hotel industry as travel restrictions from COVID-19 were lessened.

4. Franchise Fees: Although the City has not received any revenues from electric and gas franchises as of January 31, 2022, receipts from cable television and refuse franchises are trending better than anticipated by $37,079.

Page 238 of 314 ends

5. Property Tax In-Lieu of Vehicle License Fee (VLF): Since 2004, VLF has been allocated as property tax in-lieu of VLF to cities based on assessed value of real properties in each city. Based on actual revenue received through January 31, 2022, it is estimated that total year-end revenue will exceed current budget by $41,068. The projected increase is due to growth in assessed valuation.

6. Fines and Penalties: This category comprises of vehicle and Municipal Code related violation fines. Projected revenues are anticipated to be less than current budget amount by $32,682 mainly due to lower code enforcement fines.

7. Interest Income/Lease: The City is anticipating decrease in revenues of $310,797 due to revenues from the Silverlakes ground and parking lease deferment until September 2023. The deferment period was inadvertently not correctly factored when the FY 2021-2022 budget was prepared and adopted.

8. Community Development Fees: Community development fees consist of planning, engineering and building fees. These revenues are estimated at the beginning of the fiscal year based on the anticipated level of development activities. More information is now available that shows more revenues than previously anticipated will be received from CapRock’s Saddle Ranch and Palomino development projects. Revenues are also projected higher because of expected receipt of development fees before the end of the fiscal year from a hotel development project. The increase in revenue from CapRock projects is due to a change in the methodology used to calculate electrical, plumbing and mechanical permit fees. These fees are now calculated on square feet basis. Revenues are recommended to be increased by $1,122,927.

9. Community Services Revenues: This category includes recreation activities fees, facilities rental, Wee-People Program and revenues related to special events.

Overall revenue projection for this category is expected to increase by $67,679 as restrictions are lifted from the Coronavirus pandemic.

10.Other Revenues: This revenue category includes receipts from dog license, Emergency Medical Subscription (EMS), business license renewal and processing fees, penalties, refuse billing and collection, fire inspection fees, etc. More information is now available that shows higher receipts than previously anticipated from emergency medical subscription, fire inspection fees and other miscellaneous revenues. Consequently, revenues are recommended to be increased by $75,069.

11.Overhead Cost Allocation Reimbursements: This category includes transfer from other funds for reimbursement of administrative overhead. There are no changes recommended as result of this mid-year budget review.

Proposed General Fund Expenditure Adjustments:

Administration Department: Administration department budget consists of the City Manager’s Office, City Clerk, Economic Development and Human Resources. The budget is recommended to be increased by $16,250 to replace scanning equipment and conference room chairs.

Page 239 of 314 ends

Community Development: Community development department includes planning, building and safety, and code enforcement. There are no changes recommended as result of this mid-year budget review.

Community Services: This department includes recreation services, special events, youth and teen services, senior citizens program, and animal control. There are no changes recommended as result of this mid-year budget review.

Facilities and Maintenance: Expenditures in this department are for Facilities and Parks Maintenance costs. The budget is recommended to be increased by $78,829 due to contractual services for unexpected repairs at various locations (Ingalls bleachers repairs due to rust, Fire Station #57 water mainline break repairs and the demolition of an office trailer located at the former Norco Public Library) and small office equipment.

Fire/Emergency Medical Services: The budget in this department provides funding for the cost of the contract between the City and Riverside County/Cal Fire for fire protection and emergency medical services response. During the annual budget process, staff reduced the budget estimate provided by the County based on historical trends. As part of this mid-year budget review, staff has reviewed the budget based on the invoices received/paid for the first quarter of the fiscal year and the updated budget estimate provided by the County. Based on this review, no changes are recommended.

Fiscal and Support Services Department: There are no changes recommended as result of this mid-year budget review.

Legislative Department: Expenditures in this department are for City Council and City Attorney costs. There are no changes recommended as result of this mid-year budget review.

Non-Departmental: The costs included in non-departmental are General Fund costs that are not budgeted in any specific department. These costs generally benefit multiple departments and consist mainly of expenditures for excess liability insurance, excess workers compensation insurance, retiree health insurance premiums, contributions to pre-fund retiree health insurance liabilities, self-insurance liability and workers compensation claim settlements, professional and consultant services, accrued pension liability costs for the dissolved fire department employees, etc. Based on actual expenditures to date, staff is recommending that appropriation be increased by $159,853 as a result of an additional assessment for general liability approved by PERMA JPA Board.

Sheriff’s Department: The costs included in this department consists mainly of costs associated with the City’s law enforcement contract with Riverside County. The cost for the department is largely determined based on Riverside County law enforcement contract rates. At the time the FY 2021-2022 budget was approved, the contract rate was estimated to increase by 5.25%. The County now believes that the contract rate will increase by 4.12%. The estimated budget savings from the rate reduction will be used to fund costs for the addition of a Dedicated Traffic Deputy which is anticipated to start towards the end of the fiscal year.

Page 240 of 314 ends

General Fund Balance:

The City’s operating budget for Fiscal Year 2021-2022 was adopted by the City Council on June 16, 2021 for Fiscal Year July 1, 2021 through June 30, 2022. The initial adopted budget had a projected deficit in the amount of $677,130 mainly due to the economic uncertainty of the Coronavirus Pandemic. The American Rescue Plan Act (ARPA) Fund budget was adopted by the City Council on October 20, 2021. As a result of the ARPA budget adoption and additional budget amendments approved by City Council, the amended General Fund reserves amount increased by $1,373,302. The recommended mid-year adjustments will result in a net increase to the previously estimated General Fund reserves amount by $2,941,379 because of the $3,196,311 increase in projected revenues and $254,932 increase in projected expenditures during this mid-year budget review. The General Fund estimated fund balance as of June 30, 2022 is $20,948,483 before any contribution to PARS as discussed below.

PARS Pension Stabilization Rate Program:

The City Council approved the adoption of the Internal Revenue Code (IRC) Section 115 Pension Rate Stabilization Program Trust Administered by the Public Agency Retirement Services (PARS) on August 18, 2021. Based on the Policy approved by the City Council to implement PARS Pension Rate Stabilization Program, the initial amount of contribution for Fiscal Year 2021-2022 is determined by City Council based on the following items:
• A percentage of FY 2020-2021 General Fund surplus as determined by City Council. The surplus is defined as the amount by which total actual General Fund revenues exceeds total actual General Fund expenditures, measured as of June 30, 2021. This amount shall be calculated based on final audited financial statements. Pro-rata contributions shall be made from the Water and Sewer Funds based on average payroll of each fund for the last five fiscal years – FY 2017 through FY 2021. The surplus amount based on the final audited financial statements is $1,762,216.
• Savings from annual pre-payment of FY 2021-2022 UAL pension contribution to CalPERS ($67,500), and
• Allocation from the Special Asset Revenue Fund ($1,000,000).

Staff made the initial contribution of $1,067,500 from the $67,500 savings from the annual pre-payment UAL pension contribution and $1,000,000 from the Special Asset Revenue Fund as previously directed by City Council. As part of the mid-year review, staff is recommending for City Council to determine the percentage of the FY 2020-2021 General Fund surplus in the amount of $1,762,616 to be contributed to the Pension Rate Stabilization Program Trust. Once the percentage is determined by City Council, the contribution will be appropriated from the General Fund. Pro-rata contributions will be made from the Water and Sewer Funds based on City Council approved Policy. The amount of contribution determined by City Council will reduce corresponding General Fund reserve and Water and Sewer Funds working capital.

OTHER FUNDS
Measure R Revenues:

Measure R transactions and use tax revenue has also been revised based on the amount received year-to-date and the estimated amount yet to be received for the remainder of the FY 2021-2022. At the beginning of the fiscal year, total Measure R revenues was estimated at $5,867,000. When the budget was developed in June, there was significant

Page 241 of 314 ends

uncertainty regarding the potential impact of the coronavirus pandemic on revenue.

Despite the coronavirus pandemic, the City saw significant growth in Measure R transactions and use tax during FY 2020-2021. Early FY 2021-2022 data suggests that the strong growth in sales tax revenue experienced during FY 2020-2021 is continuing.

So, the outlook in FY 2021-2022 is favorable as the impacts on city revenues from the coronavirus pandemic continues to diminish. Through the month of November 2021, actual Measure R Transactions and Use Tax receipts totaled $3,334,252. Based on actual receipts through November 2021, staff is revising estimated revenue from $5,867,000 to $7,968,496, representing an increase of $2,101,496. Measure R Citizen’s Oversight Committee approved the Measure R mid-year amendments on their January 26, 2022 meeting (Attachment C).

Gas Tax Revenue:

The City recently received the State Department of Finance’s revised gas tax revenue estimates for Fiscal Year 2021-2022. Based on this revision, total gas tax revenue for FY 2021-2022 is expected to increase by $42,426 as detailed in Attachment A.

SB-1 Road Maintenance and Rehabilitation Fund:

Based on revised estimates from the State, SB-1 Road Maintenance and Rehabilitation account revenues are projected to be more than the amount previously included in the budget. The projected increase is $88,065.

Supplemental Law Enforcement Grant:

The City receives allocation from the State to supplement the cost of law enforcement.

The City has been informed that our FY 2021-2022 allocation will be $61,285 higher than the amount previously included in the budget.

Proposed Water & Sewer Fund Adjustments:

A review of Water Fund actual revenues through January 2022 indicates that total revenues are tracking slightly less than the original budget estimates. Expenditures are tracking according to the approved expenditure budget. Water revenue trends tend to be at their highest in the fall months due to hotter weather while revenue trends decrease in the spring months. Staff is recommending a decrease by $440,813 due to lower consumption and decrease in shut-offs revenues because of the state’s extension of shutoff moratorium.

Sewer fund revenues which primarily consist of fixed charges were also reviewed through January 2022 and determined to be slightly less than the original budget estimates by $122,231. Similarly, expenditures are tracking in line with budget.

FISCAL IMPACT:

Attachment A provides a summary of the proposed budget amendments while Attachment B provides a recapitulation of the impact of the recommended changes on the estimated fund balance of the General Fund.

RELATIONSHIP TO STRATEGIC PLAN:

The Mid-Year Budget Amendment Report is consistent with Strategic Direction #3 – Economic Development and Financial Stability “Assure financial stability by expanding

Page 242 of 314 ends

development efforts, diversifying revenue sources and continuing prudent financial management.”
REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Lisette Free, Finance Director Approved by: Andy Okoro, City Manager
Approved as to Form: John Harper, City Attorney
ATTACHMENT(S):

Attachment A
Attachment B
Attachment C
Resolution No. 2022-17

Page 243 of 314 ends

Attachment A - Page 1 of 2

GENERAL FUND REVENUE CATEGORIES
Budget
Amount
Mid-Year
Budget
Estimate
Proposed
Adjustment Comments
Property Tax 2,268,055 $ 2,311,753 43,698 Slight increase related to secured property tax and property tax increment Sales Tax 8,528,389 10,097,640 1,569,251 Increase based on current actuals Other Taxes 1,678,615 2,261,633 583,018
Estimated increase in public safety tax, property transfer tax and business licenses
Franchise Fees 1,956,901 1,993,980 37,079 Slight increase based on current actuals Property Tax in Lieu VLF 3,022,043 3,063,111 41,068 Slight increase due to higher assessed value Intergovernmental 300 300 - No change based on current actuals Fines and Penalties 249,346 216,664 (32,682) Slight decrease in municipal code fines based on actual receipts to date Investment Earnings and Lease Income 971,498 660,701 (310,797) Decrease in Silverlakes deferment payments Community Development Fees 1,609,278 2,732,205 1,122,927 Increase in planning and building based on actual receipts to date Community Services 625,206 692,885 67,679 Slight increase in community services programs Other Revenues 1,309,524 1,384,593 75,069
Estimated increase in emergency medical subscription and fire fees and other miscellaneous revenues
Overhead and Transfers 1,580,032 1,580,032 - No change based on current actuals Total Revenues 23,799,187 $ 26,995,498 3,196,311

GENERAL FUND EXPENDITURES
Budget
Amount
Mid-Year
Budget
Estimate
Proposed
Adjustment Comments
Administration 1,213,440 $ 1,229,690 16,250
Add equipment and small office equipment (scanner system and conference room chairs)
Community Development 1,924,899 1,924,899 - No change based on current actuals Community Services 2,474,490 2,474,490 - No change based on current actuals Facilities and Maintenance 2,619,115 2,697,944 78,829 Add contractual services due to unforeseen repairs at various locations Fire and Emergency Medical Services 3,329,798 3,329,798 - No change based on current actuals Fiscal and Support Services 765,877 765,877 - No change based on current actuals Legislative 353,271 353,271 - No change based on current actuals Non-departmental 3,230,324 3,390,177 159,853 Additional assessment approved by PERMA JPA Board Public Works 472,306 472,306 - No change based on current actuals Sheriff's Department 6,042,365 6,042,365 - No change based on current actuals Total Expenditures 22,425,885 $ 22,680,817 254,932

GENERAL FUND SUMMARY
Budget
Amount
Mid-Year
Budget
Estimate
Proposed
Adjustment Comments
Total General Fund Revenues 23,799,187 $ 26,995,498 3,196,311 Projected revenues for FY 2021-2022 increased by $3,153,681 Total General Fund Expenditures 22,425,885 22,680,817 254,932 Projected expenditures for FY 2021-2022 increased by $249,932 Total Revenues Over (Under) Expenditures 1,373,302 $ 4,314,681 2,941,379 Projected General Fund balance for FY 2021-2022 increased by $2,903,749 City of Norco
FY 2021-2022 Mid-Year Budget Amendments Schedule

Page 244 of 314 ends

Attachment A - Page 2 of 2
City of Norco
FY 2021-2022 Mid-Year Budget Amendments Schedule

MEASURE R REVENUES
Budget
Amount
Mid-Year
Budget
Estimate
Proposed
Adjustment Comments
Measure R Sales and Use Tax Transactions 5,867,000 $ 7,968,496 2,101,496 Increase in Measure R sales and use tax transactions

WATER FUND REVENUES
Budget
Amount
Mid-Year
Budget
Estimate
Proposed
Adjustment Comments
Total Water Fund Revenues 13,622,870 $ 13,182,057 (440,813) Net of decrease in water, fixed charges, irrigation charges, suspension of shutoffs and an increase in bulk water revenues

SEWER FUND REVENUES
Budget
Amount
Mid-Year
Budget
Estimate
Proposed
Adjustment Comments
Total Sewer Fund Revenues 7,837,573 $ 7,715,342 (122,231) Decrease in sewer charges revenues

GAS TAX FUND REVENUE CATEGORIES
Budget
Amount
Mid-Year
Budget
Estimate
Proposed
Adjustment Comments
2103 Apportionment 212,410 $ 229,496 17,086 Based on state revision - recovery in fuel consumption and rate adjustments 2105 Apportionment 156,037 160,067 4,030 Based on state revision - recovery in fuel consumption and rate adjustments 2106 Apportionment 98,862 100,485 1,623 Based on state revision - recovery in fuel consumption and rate adjustments 2107 Apportionment 198,450 218,137 19,687 Based on state revision - recovery in fuel consumption and rate adjustments 2107.5 Apportionment 6,000 6,000 - No change
Interest Income 200 200 - No change
Total Revenues 671,959 $ 714,385 42,426
SB-1 ROAD & MAINTENANCE REHABILIATION

FUND REVENUE CATEGORIES
Budget
Amount
Mid-Year
Budget
Estimate
Proposed
Adjustment Comments
SB-1 Road Maintenance and Rehabilitation Account 472,477 $ 560,542 88,065 Based on state revision - higher gas tax receipts

SUPPLEMENTAL LAW REVENUE CATEGORIES
Budget
Amount
Mid-Year
Budget
Estimate
Proposed
Adjustment Comments
Supplemental Law Revenue 100,000 $ 161,285 61,285 Based on state's revision due to population growth

Page 245 of 314 ends

Attachment B - Page 1 of 1
City of Norco
General Fund - Estimated Fund Balance
As of June 30, 2022
Description
Audited Fund Balance as of June 30, 2021 16,633,802 $
Total Estimated FY 2021-2022 Revenues - Adopted Budget 23,799,187 Total Estimated FY 2021-2022 Expenditures - Adopted Budget (22,425,885) Total Estimated FY 2021-2022 Estimated Revenues Over (Under) Expenditures 1,373,302 Total Estimated FY 2021-2022 Revenue Adjustments - Mid-Year 3,196,311 Total Estimated FY 2021-2022 Expenditure Adjustments - Mid-Year (254,932) Total Estimated FY 2021-2022 Estimated Revenues Over (Under) Expenditures 2,941,379

Page 246 of 314 ends

Total General Fund Estimated Fund Balance as of June 30, 2022 20,948,483 $ Measure R Citizens' Oversight
Committee

STAFF REPORT
Date: January 26, 2022 Agenda Item:

4.B.

To: Honorable Chair and Committee Members
Prepared By: Lisette Free, Finance Director
Department: Finance
SUBJECT:

FY 2021-2022 Measure R Transactions and Use Tax Mid-Year Budget Review and Amendments
RECOMMENDATION:

Approve Mid-Year amendments and recommend City Council approval SUMMARY:

The Measure R Transactions and Use Tax budget for Fiscal Year 2021-2022 was approved by the Citizens’ Oversight Board (COC) on May 26, 2021, for the period from July 1, 2021 through June 30, 2022. The COC approved budget was subsequently adopted by the City Council on June 16, 2021. The proposed Mid-Year budget adjustments are necessary to reflect information that has become available since the budget was adopted and to incorporate new projects and/or programs that are necessary to maintain and preserve infrastructure. For the Mid-Year, total revenues are proposed to be increased by $2,101,496 and there are no proposed mid-year adjustments for expenditures.

BACKGROUND:

On May 26, 2021, COC approved Measure R Transactions and Use Tax budget with total FY 2021-2022 expenditures of $5,510,000 and revenues totaling $5,867,000. The FY 2021-2022 budget also included carryover amount of $5,305,074 for previously approved projects that were not completed as of the end of FY 2020-2021. Based on actual expenditures at the end of FY 2020-2021, the carryover amount has been revised to be $6,121,036. The total FY 2021-2022 appropriation through December 31, 2021 is $5,510,000 and total carryover projects from previous year is $6,121,036. Staff has completed a Mid-Year review of the budget and are recommending the following adjustments as detailed in Attachment A.

Attachment C

Page 247 of 314 ends

Revenue Adjustments:

As part of this review, transactions and use tax revenue has also been revised based on the amount received year-to-date and the estimated amount yet to be received for the remainder of the FY 2021-2022. At the beginning of the fiscal year, total Measure R revenues was estimated at $5,867,000. When the budget was developed in June, there was significant uncertainty regarding the potential impact of the coronavirus pandemic on revenue. Despite the coronavirus pandemic, the City saw significant growth in Measure R transaction and use tax during FY 2020-2021. Early FY 2021-2022 data suggests that the strong growth in sales tax revenue experienced during FY 2020-2021 is continuing.

So, the outlook in FY 2021-2022 is favorable as the impacts on city revenues from the coronavirus pandemic continues to diminish. Through the month of October 2021, actual Measure R Transactions and Use Tax receipts totaled $2,656,165. Based on actual receipts through October 2021, staff is revising estimated revenue from $5,867,000 to $7,968,496, representing an increase of $2,101,496.

Expenditure Adjustments:

Staff has reviewed the status of the projects for FY 2021-2022 Measure R expenditures and has no proposed expenditure adjustments.

FISCAL IMPACT:

Attachment A provides a summary of the recommended adjustments to the FY 2021- 2022 Transactions and Use Tax Budget. Revenues are recommended to increase by $2,101,496 and no recommendation to adjust expenditures. The estimated available fund balance as of June 30, 2022 based on these adjustments is $5,525,385.

RELATIONSHIP TO STRATEGIC PLAN:

This item is consistent with Strategic Directive No. 3 - Assure financial stability by identifying new revenue sources and continuing prudent financial management.

REVIEWED AND APPROVED BY:

ATTACHMENT(S):

Attachment A - Measure R Mid Year Budget

Page 248 of 314 ends

Attachment A
Revenue Description
FY 2021-2022
Approved
Budget
FY 2021-2022
Proposed
Adjustment
FY 2021-2022
Amended
Budget
Revenues
Estimated Measure R Tax Revenues $ 5,867,000 $ 2,101,496 $ 7,968,496 Investment Earnings 90,762 90,762 -
Total Revenues $ 5,957,762 $ 2,101,496 $ 8,059,258
Expenditures
Operating and Maintenance
Trail System Maintenance $ 567,000 $ - $ 567,000
Committee Stipends 1,400 - 1,400
Professional Services 10,000 - 10,000
Street Maintenance 250,000 - 250,000
Subtotal 828,400 828,400 -
Carryover Projects
Animal Control, Parmenter Park, Wayne Makin Parking Lots 272,673 - 272,673 City Hall/Sheriff Sub-Station Improvements 238,794 - 238,794 Citywide ADA Assessment 67,575 - 67,575
Citywide HVAC/EVC Project 309,441 - 309,441
Citywide Urban Forest Tree Planting Program 69,843 - 69,843 Moreno Arena Sound System 130,000 - 130,000
Nellie Weaver Hall Improvements 538,350 - 538,350
Playground Replacement Project 310,672 310,672 -
Pole Barns 955,844 - 955,844
Riley Gym Improvements 555,146 - 555,146
Riley Gym, Community Center, Scott House Parking Lots 296,828 - 296,828 River Road Parkway Improvement Project 310,287 310,287 - Santa Ana River Trail Project 201,458 - 201,458
Trail Fence Replacement - Various Locations 833,484 - 833,484 Valley View Pavement Project 1,030,641 - 1,030,641
Subtotal 6,121,036 6,121,036 -
New Projects/Programs
Citywide ADA Improvement Project 200,000 - 200,000
Citywide Facility Painting and Treating 150,000 - 150,000 Citywide Flooring 200,000 - 200,000
Citywide Irrigation System Upgrade 210,000 - 210,000
Citywide Park Enhancements 510,000 510,000 -
Dales and Parkridge Pavement Project 630,000 - 630,000
Hillside Ave Pavement Project 910,000 - 910,000
Second Street Pavement Project - East Side 1,000,000 - 1,000,000 Shadow Canyon Circle Pavement Project 460,000 - 460,000 Third Street Payment Project 860,000 860,000 -
Various Minor Street Pavement Projects 330,000 330,000 - Wayne Makin/Shearer Master Plan 50,000 50,000 -
Subtotal 5,510,000 5,510,000 -
Total Expenditures $ 12,459,436 $ 12,459,436 - $
Revenues Over (Under) Expenditures $ (4,400,178)
Beginning Fund Balance, July 1, 2021 9,925,563
Estimated Ending Fund Balance, June 30, 2022 $ 5,525,385 Measure R Transactions and Use Tax
FY 2021-2022 Measure R Mid-Year Budget

Page 249 of 314 ends

RESOLUTION NO. 2022-17

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORCO,

CALIFORNIA, APPROVING VARIOUS MID-YEAR AMENDMENTS TO
FISCAL YEAR 2021-2022 ANNUAL OPERATING BUDGET AND

AUTHORIZING CHANGES IN APPROPRIATIONS AND REVENUES

THERETO
WHEREAS, the Fiscal Year 2021-2022 annual operating budget for the City of Norco, California was adopted by the City Council on June 16, 2021; and WHEREAS, certain revenue items listed and attached hereto have been revised to reflect estimated increases/decreases in the adopted budget (Attachment A); and WHEREAS, certain expenditure/expense items listed and attached hereto have been revised to reflect estimated increases/decreases in the adopted budget (Attachment A); and
WHEREAS, these revenue and expenditure/expense changes are necessary to accurately reflect the City’s estimated expenditure and revenue budget for Fiscal Year 2021-2022; and
WHEREAS, the estimated year-end fund balance has been revised to include the mid-year adjustments to the budget, and is attached hereto (Attachment B); and WHEREAS, the City Council is to determine the amount of the FY 2020-2021 General Fund Surplus of $ 1,762,216 is to be used to fund contributions to the City’s Pension Rate Stabilization Trust;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Norco at a regular meeting held on March 2, 2022, approved the budget changes listed on Attachments A and B.

Page 250 of 314 ends

Resolution No. 2022-17 – Mid-Year Amendments to FY 2021-2022 Annual Operating Budget

Page 2 ends

March 2, 2022
PASSED AND ADOPTED by the City Council of the City of Norco, California, at a regular meeting held on March 2, 2022.
_______________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
_________________________
Dana Roa, CMC, City Clerk
City of Norco, California
I, DANA ROA, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was introduced and adopted by the City Council of the City of Norco, California, at a regular meeting thereof held on March 2, 2022, by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Norco, California, on March 2, 2022.
_________________________
Dana Roa, CMC, City Clerk
City of Norco, California
Attachments:

Attachment A: FY 2021-2022 Mid-Year Budget Amendments Schedule Attachment B: General Fund – Estimated Fund Balance as of June 30, 2022

Page 251 of 314 ends

City Council

STAFF REPORT
Date: March 2, 2022 Agenda Item:

6.A.

To: Honorable Mayor and City Council Members
Prepared By: Alma Robles, Planning Director
Department: Planning
SUBJECT:

Zone Code Amendment 2021-04 (City of Norco): An amendment to Title 18 (Zoning) of the Norco Municipal Code to establish Objective Development Standards (ODS) that will apply to any housing development project or mixed used housing project that, pursuant to State law, requires ministerial approval, or may be subject to discretionary review.

RECOMMENDATION:

Adopt Resolution No. 2022-18, recommending approval of the Objective Development Standards; and
Adopt Ordinance 1080, at its First Reading, recommending approval of Zone Code Amendment 2021-04; schedule the Second Reading on March 16, 2022.

SUMMARY:

Objective Development Standards (ODS): The proposed ODS, once adopted by the City of Norco will be used to evaluate multi-family residential and mixed-use development applications, and provide direction to developers and property owners on the key design components to streamline the project approval process. The proposed ODS will also be used as developments standards and design guidelines for projects that are not subject to ministerial review. The ODS will be adopted under separate resolution and will consist of a separate document but that will be referenced in the Norco Municipal Code (NMC).

Zoning Code Amendment 2021-04: Amendments to the NMC Chapter 18.02 "Definitions", Chapter 18.17 - "R-3 Low Density Multiple-Family Residential", and Chapter

18.64 - "Housing Development Overlay (HDO) Zone" are required to empower the Objective Development Standards.

BACKGROUND:

OBJECTIVE DEVELOPMENT STANDARDS

Page 252 of 314 ends

Purpose: Attached as Exhibit "A" - are the proposed ODS document. This document consists of standards that provide objective criteria to be used as the basis for project approval or denial when a project is eligible for ministerial approval. The ODS would apply to projects that consists of housing or mixed use housing projects in either the R-3 or HDO zone that comply with Senate Bill (SB) 35 for ministerial approval, and for projects in the HDO zone that are proposed with 20 percent affordability and on sites that are being re-used from the previous housing element cycle.

Project applications eligible for this process shall receive a ministerial, non-subjective review. The ODS are proposed for adoption by the City of Norco to comply with California Senate Bill 35 and Government Code Section 65913.4. SB 35 requires cities and counties to streamline review and approval of eligible affordable housing projects through a ministerial process, exempting such projects from environmental review under the California Environmental Quality Act (“CEQA”). This process does not allow public hearings to consider the merits of the project; rather only design review or public oversight of the development is allowed, which must be objective and strictly focused on assessing compliance with criteria required for streamlined projects as well as objective design review of the project (Section 65913.4(c)(1)).

SB 35 requires the availability of a streamlined ministerial approval process for multifamily residential developments in jurisdictions that have not yet made sufficient progress toward meeting their regional housing need allocation (RHNA) goal for construction of abovemoderate income housing and/or housing for units below 80% area median income (AMI).

As a part of this streamlining process, cities are required to establish ODS for multifamily residential development.

SB 35 defines an ODS as one that involves “no personal or subjective judgment by a public official and is uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant…and the public official prior to submittal.”
The proposed ODS will also be used as developments standards and design guidelines for projects that are not subject to ministerial review in the HDO zone.

Applicability: These development standards apply to proposals for new multifamily and mixed use development within the City of Norco. According to the parameters set forth by Senate Bill 35, the Streamlined Ministerial Process shall be available to proposed communities having at least 10% of units priced to be affordable to households making at or below 80% of the Average Median Income level (AMI), prior to calculating any density bonus.

The site must meet the “infill” requirements (SB 35 definition), and be zoned for residential or mixed-use development. The applicant must also demonstrate that the site is not within Prime Farmland, or farmland within statewide importance, wetlands, a very high fire hazard zone, an earthquake fault zone, special flood hazard area, protected habitat area, or a conservation easement.

User Guide: The ODS are structured to create an easily understood document using accessible language and imagery to streamline the approval process. A baseline index of quality is established while creativity is encouraged, and deviations are allowed on a case by case basis.

Page 253 of 314 ends

• Chapter 1: Introduction. Overview of the purpose of the document and applicability of the Standards.
• Chapter 2: General Development Standards. Standards regarding height, lot coverage, requirements for mixed-use and multi-family homes. • Chapter 3: Site and Landscape Design Standards. Standards for placement of buildings, orientation of entrances, connection to pedestrian pathways, landscape elements, open space, buffer areas, walls and fencing, as well as lighting and placement of parking and trash enclosures.
• Chapter 4: Building Design Standards. Required elements relating to form and massing, roof design, windows, and colors and materials. • Chapter 5: Architectural Style Standards. Standards regarding the design of desired architectural style for Norco.
• Chapter 6: Administration. Overview of the approval process and definition of terms used within the document.
• Appendix A: Adopting Resolutions. The City Council resolutions adopting the document.

PLANNING COMMISSION MEETING, FEBRUARY 16, 2022
The Planning Commission reviewed the proposed ODS at their last meeting and had several comments:
• Phasing plan, need to clarify and add details regarding project phasing and what common area amenities are built with each phase of housing. • No exterior balconies beyond the 25’ height.
• Provide off-street parking standards for trailer parking minimum 10’ by 40’ and provide turning radius examples.
• Limit compact stall, if applicable.
• Clarity on the amenities, what size is a small or large amenity and more detail of each.

These comments have been incorporated into the document included in the Council's packet.

ZONING CODE AMENDMENTS
In order to implement the ODS, there are multiple sections of the Norco Municipal Code that need to be amended.
• Chapter 18.02 "Definitions" is proposed to be amended by adding a new definition for ODS. The definition is proposed to read: "Objective Development Standards:

Those that “involve no personal or subjective judgement by a public official and are uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant and public official prior to submittal.”; and
• Chapter 18.17 "R-3 Low Density Multiple-Family Residential" is proposed to be amended by adding a new section, Section 18.17.44, to read as follows: "Any project within the R-3 zone that qualifies for ministerial approval in compliance with State law shall follow the the Objective Development Standards adopted by the City"; and

Page 254 of 314 ends

• Chapter 18.64 "Housing Development Overlay (HDO) Zone" is proposed to be amended by adding the following new sections:
• Section 18.64.14 R. Any project within the HDO zone that qualifies for ministerial approval in compliance with State law shall follow the the Objective Development Standards adopted by the City".
• Section 18.64.14 S. The Objective Development Standards adopted by the City of Norco shall serve as the design and developments standards/guidelines for all projects that are not subject to ministerial approval. When not subject to ministerial approval, these standards can be modified at the discretion of the Planning Commission and/or the City Council.

CEQA: In accordance with the California Environmental Quality Act (“CEQA”), the proposed Ordinance has been deemed to be exempt from further environmental review as there is no possibility that the proposed Ordinance would have a significant impact on the environment pursuant to State CEQA Guidelines Section 15061(b)(3). The project will not result in any increase in the intensity or density of any land use above what’s currently allowed. Staff is recommending that a Notice of Exemption be prepared and be filed in accordance with CEQA Guidelines.

Noticing: Legal noticing was provided in the Press Enterprise on February 19, 2022 and met the requirements for public hearings.

Conclusion: These ODS are intended to supplement the Municipal Code by providing additional parameters for development within the Housing Development Overlay (HDO) zone into low-density multiple-family residential living areas compatible with the City's rural environment. Such areas are envisioned as being so located and designed as to be complementary to adjacent activities and at the same time provide suitable space for those who prefer and/or need multiple-family living quarters.

FISCAL IMPACT:

There is no financial impact.

RELATIONSHIP TO STRATEGIC PLAN:

Adopting a Zoning Code Amendment pertinent to the the City's Housing Element to comply with State requirements is consistent with Strategic Direction #3 - Economic Development and Financial Stability.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Lisette Free, Finance Director Approved by: Andy Okoro, City Manager
Approved as to Form: John Harper, City Attorney
ATTACHMENT(S):

Exhibit A

Page 255 of 314 ends

Resolution No. 2022-18
Ordinance No. 1080

Page 256 of 314 ends

OBJECTIVE

DEVELOPMENT

STANDARDS
MARCH 2, 2022

CITY OF NORCO, CALIFORNIA

Page 257 of 314 ends

ii CITY OF NORCO, CALIFORNIA

Page 258 of 314 ends

OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 iii

OBJECTIVE DEVELOPMENT STANDARDS
March 2, 2022
Community Development Staff:

Alma Robles, Planning Director
Joshua Altopp, Senior Planner
Erika Woods-Diaz, Assistant Planner
Prepared By:

PlaceWorks
3 MacArthur Place, Suite 1100
Santa Ana, CA 92707
City of Norco
2870 Clark Avenue
Norco, CA 92860
City Council Members:

Greg Newton, Mayor
Robin Grundmeyer, Mayor Pro-Tem
Katherine Aleman
Kevin Bash
Ted Hoffman
City Manager:

Andy Okoro

Page 259 of 314 ends

iv CITY OF NORCO, CALIFORNIA

ADOPTING RESOLUTIONS
(Insert date and list of resolutions , with amendments.

Refer to Appendix A, Adopting Resolution for
complete text.)

Page 260 of 314 ends

OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 v

TABLE OF CONTENTS
Chapter 1 - Introduction 1

1.1 Overview & Purpose . . . . . . . . . . . . . . . . . . . 1

1.2 Applicability . . . . . . . . . . . . . . . . . . . . . . . . .2

1.3 User Guide . . . . . . . . . . . . . . . . . . . . . . . . . 3 Chapter 2 - General Development Standards

2.1 Intent & Purpose . . . . . . . . . . . . . . . . . . . . .5

2.2 Building Height . . . . . . . . . . . . . . . . . . . . . .5

2.3 Lot Coverage . . . . . . . . . . . . . . . . . . . . . . . 5

2.4 Setbacks . . . . . . . . . . . . . . . . . . . . . . . . . . 6

2.5 Distance between Buildings . . . . . . . . . . . . 6

2.6 Walls & Fences . . . . . . . . . . . . . . . . . . . . . .6

2.7 Off-Street Parking . . . . . . . . . . . . . . . . . . . .6

2.8 Size of Dwellings . . . . . . . . . . . . . . . . . . . . .6

2.9 Usable Open Space . . . . . . . . . . . . . . . . . . .6

2.10 Required Landscape . . . . . . . . . . . . . . . . . 7

2.11 Common Amenities . . . . . . . . . . . . . . . . . .7

2.12 Site Lighting . . . . . . . . . . . . . . . . . . . . . . . 7 Chapter 3 - Site & Landscape Design Standards

3.1 Community Structure . . . . . . . . . . . . . . . . . 9

3.2 Building Orientation . . . . . . . . . . . . . . . . . 12

3.3 Parking . . . . . . . . . . . . . . . . . . . . . . . . . . 13

3.4 Service Areas & Utlities. . . . . . . . . . . . . . . 14

3.5 Lighting . . . . . . . . . . . . . . . . . . . . . . . . . . .15 Chapter 4 - Building Design Standards

4.1 Building Mass & Articulation . . . . . . . . . . . . . . 17

4.2 Roof & WIndow Forms . . . . . . . . . . . . . . . . . .19

4.3 Materials & Colors . . . . . . . . . . . . . . . . . . . . .20

4.4 Garages & Carports . . . . . . . . . . . . . . . . . . . . 21 Chapter 5 - Architectural Style Standards 35

5.1 Intent & Purpose . . . . . . . . . . . . . . . . . . . . . .23

5.2 Western Architecture . . . . . . . . . . . . . . . . . . 24 Chapter 6 - Administration 35

6.1 Administration of Standards . . . . . . . . . . . . . .37

6.2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . 39 Appendix A - Adoption Resolutions
A.1 Adopting Resolutions . . . . . . . . . . . . . . . . . . 45

Page 261 of 314 ends

vi CITY OF NORCO, CALIFORNIA

Page 262 of 314 ends

Chapter 1: Introduction
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 1

1.1 Overview & Purpose
These Objective Design Standards have been adopted by the City of Norco to evaluate residential and mixed-use development applications, and provide direction to developers and property owners on the key design components to streamline the project approval process. The standards also encourage development of workforce housing compatible with the surrounding neighborhood and the overall character of the City of Norco, while also ensuring a high level of design quality, and appropriate site planning.

This document addresses changes in California State laws by placing an emphasis on standards that provide objective criteria to be used as the basis for project approval or denial. Project applications eligible for this process (refer to Section 1.2, Applicability) shall receive a ministerial, non-subjective review. These standards have been adopted by the City of Norco to comply with California Senate Bill 35, and accordingly apply to the ministerial approval of proposals for new multifamily and mixed use development within the City of Norco that qualify as an “SB35” project.

Additionally, these Design Standards may be used as design guidelines for the discretionary review of multifamily and mixed-use development proposed within the City of Norco that does not qualify as an SB35 project and therefore does not qualify for ministerial review.

Chapter 1 - Introduction

Page 263 of 314 ends

2 CITY OF NORCO, CALIFORNIA

1.2 Applicability
Senate Bill (“SB”) 35 Government Code Section 65913.4
SB 35 requires cities and counties to streamline review and approval of eligible affordable housing projects through a ministerial process, exempting such projects from environmental review under the California Environmental Quality Act (“CEQA”). This process does not allow public hearings to consider the merits of the project; rather only design review or public oversight of the development is allowed, which must be objective and strictly focused on assessing compliance with criteria required for streamlined projects as well as objective design review of the project (Section 65913.4(c)(1).

According to the parameters set forth by Senate Bill 35, the Streamlined Ministerial Process shall be available to proposed communities having at least 10% of units priced to be affordable to households making at or below 80% of the Average Median Income level (AMI), prior to calculating any density bonus. Additionally, the project site must meet the “infill” requirements (SB 35 definition), and be zoned for residential or mixed-use development. The applicant must also demonstrate that the site is not within Prime Farmland, or farmland within statewide importance, wetlands, a very high fire hazard zone, an earthquake fault zone, special flood hazard area, protected habitat area, or a conservation easement.

As a part of this streamlining process, cities are required to establish objective design standards for multifamily residential development.

SB 35 defines an objective design standard as one that involves “no personal or subjective judgment by a public official and is uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant… and the public official prior to submittal.”

Page 264 of 314 ends

Chapter 1: Introduction
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 3

1.3 User Guide
The Objective Design Standards are for residents, property and business owners, developers and builders, architects and designers, and City staff involved in the review and approval process of multifamily and/or mixed-use development in City of Norco. The following steps are a quick way to understand the different sections of the document and how to use it.

Step 1: Review the General Development Standards.

Numeric standards regarding height, lot coverage, requirements for mixed-use and multi-family homes are described in this section.

Step 1: Review the Site & Landscape Design Standards.

Site Planning involves a careful analysis of the opportunities and constraints of the site, including existing features such as mature trees, topography, and drainage patterns. The components of site development extend beyond building placement and configuration, including surrounding uses, retaining walls, landscape design, hardscape considerations, and parking. The Site & Landscape Design Standards outline several requirements on these topics.

Step 2: Review the Building Design Standards.

While new projects need not copy existing development, their mass and scale shall respect adjacent building context and uses.

The General Building Design Standards establish requirements on these issues. Standards related to garage doors and entries are also established here.

Step 3: Review the Architectural Style Standards.

The design and detailing of buildings are paramount to a quality environment, and the City of Norco is committed to authentic expressions of the Western architectural style. Architectural design elements and materials shall be consistent throughout the project, recognizing that a building is 3-dimensional and must be well designed on all sides. Detailing, choice of materials, window and door choices shall reinforce the overall project design.

Step 4: Review the City of Norco Municipal Code.

All developments must comply with the standards of the Norco Municipal Code Title 18 (Zoning), and any applicable Specific Plan or Overlay Zoning District.

Step 5: Consult with the Planning Staff.

It is highly recommended for prospective applicants to obtain and become familiar with the application and submittal requirements for a project prior to a formal submittal. A pre-application meeting with City staff allows applicants to receive staff review from various departments prior to a formal application submittal.

Applicants shall follow application procedures as directed by staff.

The City of Norco Municipal Code establishes required procedures for submitting and reviewing development applications. Applicants shall follow these procedures and requirements.

Page 265 of 314 ends

4 CITY OF NORCO, CALIFORNIA

Page 266 of 314 ends

Chapter 2: General Development Standards
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 5

2.2 Building Height
Buildings and other structures erected in this district shall have a maximum height of 35 feet (35’) as measured to the ridge line and/or parapet, with the following exceptions:

Buildings or structures located within 35 feet (35’) of a R1 or A1 zone shall have a maximum height of 30 feet (30’) as measured to the ridge line and/or parapet.

Buildings or structures located one hundred feet (100’) or more from the property perimeter shall have a maximum height of forty feet (40’) as measure to the ridge line and/or parapet.

Chimneys, elevator over-runs, stairwells, and service shafts may exceed height limit by five feet (5’).

Decks and/or balconies shall not exceed a height of twenty-five (25’).

2.3 Lot Coverage
The maximum lot coverage of all structures shall not be more than sixty percent (60%) of the total lot area
Chapter 2 - General Development Standards

2.1 Intent & Purpose
These standards are intended to supplement the Municipal Code by providing additional paramenters for development within the R-3 and Housing Development Overlay (HDO) zones into low-density multiplefamily residential living areas compatible with the rural environment and outdoor recreation potential of the community. Such areas are envisioned as being so located and designed as to be complementary to adjacent activities and at the same time provide suitable space for those who prefer and/or need multiple-family living quarters.

Where these standards are silent or conflict with the Municipal Code, the Municipal Code shall prevail.

Page 267 of 314 ends

6 CITY OF NORCO, CALIFORNIA

2.4 Setbacks
From any public street frontage, no structure or parking lot shall be within twenty-five feet (25’) of the property line.

From any interior lot line, structures shall be setback from the property line a minimum distance equal to one-half (1/2) the building height as measured from the ridgeline and/or parapet (i.e. a 24’ high building shall be setback 12’ from the property line, whereas a 10’ high building shall be setback 5’).

Parking lots shall be setback from interior lot lines by a minimum 5 foot (5’) landscaped buffer.

2.5 Distance Between Buildings
The minimum distance between buildings on the same lot shall be fifteen feet (15’) side to side.

2.6 Walls, Fences and Structures
Within the Setback
When a non-single-family lot abuts an R-1 or A-1 lot anywhere but the front yard of said R-1/A-1 lot, a ten foot (10’) tall masonry wall is required.

Retaining Walls
Retaining walls shall not exceed six feet (6’) in height A maximum of three (3) successive walls are permitted, provided that they are at least five feet (5’) apart and have a slope between walls not to exceed 2:1 horizontal to vertical steepness and that they do not exceed a combined height of twelve feet (12’).

2.7 Off-Street Parking
Parking shall be provided at the following minimum ratios:
• 2 spaces for each studio or 1 bedroom unit
• 3 spaces for each 2 bedroom unit
• 4 spaces for each 3 bedroom unit
• 1 guest spaces for every 4 units
• 1 trailer space (minimum 10’ x40’ with minimum turning radius of 40’) for every 20 units
Required parking stalls shall be a minimum of 9’ x20’.

Parking design shall also comply with the standards in Section 3.3.

2.8 Size of Dwellings
Each dwelling unit shall have a floor area not less than 500 square feet, exclusive of open porches and private garages.

2.9 Usable Open Space
Minimum private usable open space per unit shall be eighty square feet (80sf) with a mimimum depth of six feet (6’).

Page 268 of 314 ends

Chapter 2: General Development Standards
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 7

2.10 Required Landscape
A minimum of twenty-five percent (25%) of the total lot area shall be landscaped.

2.11 Common Amenities
Common amenities shared by individual units on the same lot or within the same developoment shall be provided at the following ratios:
• 20 units or less – no amenities required
• 21 to 50 units – 1 major amenity or 2 minor amenities • 51 to 100 units – 1 major amenity plus 1 major amenity or 2 minor amenities
• 101 to 200 units – 1 major amenity plus 2 major amenities or 4 minor amenities
• 201 to 300 units - 2 major amenities plus 2 major amenities or 4 minor amenities
• 301 units or more - 3 major amenities plus 3 major amenities or 6 minor amenities
The total number of, and scale of amenities, shall be established by the project at full build-out. Projects built in phases shall provide the minmum number of amenities as required by the total number of residential units constructed up to that phase of construction.

For the purposes of this subsection, the following definitions apply:

A minor amenity is a park (between 7500 sq ft and one-acre), playground (minimum size 3000 sq ft), chicken coops (90 sq ft minimum), community garden (minimum 15 4’x4’ plots), 2 grill barbeque area, common room (minumum 750 sq ft), OR similar scaled use as approved by the Planning Director.

A major amenity is 15’x30’ swimming pool (or equivlent surface area), one-acre park (or larger), a 4-stall horse barn (12’x12’ minumn stall size), OR similar scaled use as approved by the Planning Director.

2.12 Lighting
On-site lighting shall:
• Not exceed fifteen (15’) in height
• Be shielded and directed downward
• Shall not exceed a temperature of 3000 kelvin
• Adhere to architectural style
Lighting design shall also comply with the standards in Section 3.5.

Page 269 of 314 ends

8 CITY OF NORCO, CALIFORNIA

Page 270 of 314 ends

Chapter 3: Site & Landscape Design Standards
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 9

3.1 Community Structure
The following community-wide standards are consistent with the City of Norco General Plan and are elements used to convey an overall identity. Building and site layouts shall conform to City standards regarding minimum setbacks, minimum open space requirements, maximum height requirements, and other city standards, as defined by the Municipal Code and Chapter 2 of these standards.

Chapter 3 - Site & Landscape Design Standards
(a) Design Consistency. Provide visual identification as part of the City of Norco through complimentary landscaping, materials, and building forms.
(b) Preserve Natural Site Features. Maintain and incorporate the city’s natural amenities, including its hillsides, indigenous vegetation, and rock outcroppings, within proposed
projects.
(c) Clearly Define Public and Private Realm. Provide visual cues through planting, site planning, signage, fencing, pavement, and scale that clearly distinguish the public areas from private and semi-private areas.
(d) Pedestrian-Serving. Design for the pedestrian by including elements such as walkways which minimize crossings,
lighting, street furniture, and trash receptacles to activate the public and semi-private areas and promote walkability.
(e) Expand Equestrian Trails. Provide for the equestrian lifestyle of Norco by expanding and extending the city-wide horse trail network.

Page 271 of 314 ends

10 CITY OF NORCO, CALIFORNIA

3.1.1 Streetscapes
Streetscapes form the bulk of community structure, and visually unite a neighborhood with the larger community by using elements such as landscaping, signage, street furniture, lighting, and sidewalks.

Streetscape design is to be carefully considered, as it exerts a strong influence on the experience and perception of a project. The following Norco standards pertain to streetscapes:
(a) Visibility Triangles. The areas at the end of private drives within the visibility triangle area shall adhere to the City of Norco standard street design requirements.
(b) Crime Prevention Through Environmental Design. A key method for reducing the incidence of crime and fear of undue risk is through implementation of crime prevention through environmental design measures. Surveillance, access control, territorial reinforcement, and maintenance are four major design and usage concepts.

Page 272 of 314 ends

Chapter 3: Site & Landscape Design Standards
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 11
Neighborhood entry monument example - Plan View
Examples of neighborhood identification monuments.

3.1.2 Monuments
Monuments play a key role in the establishment of placemaking and the creation of community identity. Community monuments integrate the site with the surroundings and provide an entry and exit experience that creates an aesthetic and functional transition with adjacent areas. The following standards pertain to both monuments:
(a) Create an Identity. Community and neighborhood entry statements shall be provided that create a distinctive image. (b) Placemaking. The identity of new projects shall be
strengthened with entry monuments, street signs, and/or special street trees, landscaping, and lighting.
(c) Location. Monuments shall be placed in setbacks, landscaped entries, or open spaces at principal entries.
(d) Sight Distances. The design and placement of monuments shall maintain required sight line distances.
(e) Monument Design. Composed of low garden walls designed to fit into the landscape theme. Landscaping is required at the base of all monument signs and shall be no less in area than the square footage of the sign area.
(f) Theme. The architectural themes of the primary
structures shall be reflected in neighborhood identification monuments.
(g) Materials. Entry monuments shall be constructed of stone, brick, stucco, beams, planks, or similar materials.

Page 273 of 314 ends

12 CITY OF NORCO, CALIFORNIA

3.2 Building Orientation
During the site design process, adjacencies shall be considered and treated appropriately to maintain the visual cohesiveness of the area.

The following standards shall apply:
(a) Site Design. Building and site layouts shall conform to City standards regarding minimum setbacks, minimum open space requirements, maximum height requirements, and other city standards.
(b) Varied Setbacks. Long unarticulated building facades shall be avoided by incorporating varying setbacks of the building footprint in a varied fashion along the street.
(c) Site Entry Location. Project entries are to be located to minimize conflicts with adjacent residential neighborhoods. (d) Maximize Open Space. Buildings are to be oriented to maximize common open space with pedestrian connections
throughout. Five acres of open space are to be provided for every 1,000 residents.
(e) Observe Buffers. Require setbacks and other design
elements to buffer residential units to the extent possible from the impacts of abutting roadway, commercial,
agricultural, and industrial uses.
(g) Preserve Corridors. Recognize, preserve, and enhance the aesthetic value of the city’s enhanced landscape corridors and scenic corridors.

Parking spaces and garages should be oriented to the back or side of buildings. Off-street parking shall not dominate the streetscape.

Page 274 of 314 ends

Chapter 3: Site & Landscape Design Standards
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 13

3.3 Parking
Surface parking areas shall comply with the folloiwng standards:
(a) No more than 25% of public right of way frontage shall be used for parking.
(b) Parking shall be screened from the street by landscaping, berming, low walls or fences, or buildings.
(c) Below-grade or structured parking must be screened from the street, and is encouraged for new mixed use development that includes a large apartment building.
(d) One landscaped finger island shall be provided per every 10 spaces. Islands shall be a minimum of 5 feet (inside dimension).
(e) One tree shall be provided for every four parking spaces.

Trees shall be located within parking areas for shade potential.

Where space is limited due to property line or wall proximity and walkway location, tree planter cut-outs can be used. (f) Enhanced or textured paving or stripping shall be included where pedestrian crossing occurs in parking areas.
(g) Non loading zones shall include appropriate striping to deter parking in these areas.
(h) Where multiple garages front onto an alley or street, landscaping shall be provided between every garage at a minimum size of 2’ x 2’ for a planting well, or 30 gallons for a planter box.

Yes NO
Parking shall be located on the side or behind buildings where possible.

Parking shall be screened from the street.

Landscape islands shall be provided 1 per every 10 parking spaces.

Page 275 of 314 ends

14 CITY OF NORCO, CALIFORNIA
Illustration to of a well-designed trash enclosure
Mailboxes shall be complementary to surrounding residential buildings.

3.4 Service Areas and Utilities
Service areas shall be designed to minimize potential negative visual impacts of public and private facilities and support structures through sensitive site design and construction.
(a) Visual Buffers. Incorporate visual buffers, including landscaping, equipment and storage area screening, and roof treatments, on properties abutting residentially designated property.
(b) Trash Bins. Where individual trash bins and pick-up are proposed, the development shall ensure access and fire lanes meet minimum requirements and dimensions.
(c) Trash/recycling. Consult with local waste collector to ensure containers are large enough to handle the refuse generated by the site.
(d) Location Exhibit. A trash bin/can location exhibit will be required with the development application review to ensure proper storage and access are being provided. CC&Rs will also need to address location of bins, timing for residents to put out and bring in trash cans (if individual pickup is used) and possible parking restrictions.
(e) Mailbox Design. Cluster mailbox enclosures shall be designed to be similar or complementary in form, material, and color to the surrounding residential buildings.
(f) Mailbox Installation. Each mailbox installation shall conform to current United States Postal Service standards.

Page 276 of 314 ends

Examples of outdoor lighting.

Chapter 3: Site & Landscape Design Standards
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 15

3.5 Lighting
Lighting is an important consideration for multifamily homes to encourage nighttime activity and ensure safety. However, excess light can have negative environmental impacts. The following standards apply to lighting requirements:
(a) Entrance Lighting. Building entrances and street numbers shall be well-lit and illuminated to be visible from the street. (b) Walkway Lighting. Walkways and paseos and parking
lots and access shall be illuminated with a minimum of 1 footcandle to ensure safe nighttime conditions.
(c) Security Lighting. Security lighting fixtures shall not project above the fascia or roof of the building. Security lighting fixtures shall not be substituted for parking lot or walkway lighting fixtures.
(d) Energy Efficiency. Incorporate timers and sensors to avoid unnecessary lighting and avoid unnecessary energy use.
(e) Architectural Compatibility. Lighting Fixtures should complement and be compatible with the building’s design and architectural style.
(f) Appropriately Sized. Fixtures shall be in scale with the building facade.

Page 277 of 314 ends

16 CITY OF NORCO, CALIFORNIA

Page 278 of 314 ends

Chapter 4: Building Design Standards
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 17
Chapter 4 - Building Design Standards

4.1 Building Mass / Articulation

4.1.1 Architectural Design Concept
Residential neighborhoods shall incorporate readily identifiable common design elements such as highly articulated facades, distinct entrances, and shared recreational areas or other focal points. The scale, colors, materials, design details, and architectural style of buildings and furnishings shall reflect the overall theme. The following standards shall be reflected in the architectural concept:
(a) Distinguishable Architectural Style. Building design shall be consistent with a defined architectural style and incorporate design details commonly associated with that style.
(b) Contextually Sensitive. The architectural scale and height of neighboring projects and the character of the community shall be considered.
(c) Defined Hierarchy of Public and Private Spaces. Public and private spaces shall be separated by buildings, enclosures, landscaping, screens, vegetation, paving, grade separation, fencing, or gates and doors. These features shall distinguish a progression from the public to the private realm.

Page 279 of 314 ends

Example of well articulated multifamily building massing. 18 CITY OF NORCO, CALIFORNIA

4.1.2 Building Form and Massing
Carefully crafted streetscapes are composed of well articulated building facades. Avoidance of monotonous streetscapes through the incorporation of recesses and architectural detailing. (a) Articulation. Deep recesses and architectural detailing is required to avoid long, unbroken building expanses.
(b) Projections. Projecting architectural features such as bowed or bay windows, columns, offset roof planes, and similar features should be used to create both vertical and horizontal articulation on the building elevations.
(c) Rear and Side Elevations. These design elements shall also be included on the rear facades and sides that are adjacent to or visible from streets or open spaces.
(d) Identifiable Entries. The main building entrance shall be clearly identifiable and distinguished. All entrances shall be emphasized using lighting, landscaping, and architecture. (e) No more than six side-by-side dwelling units shall be attached in any single structure.
(f) The maximum length of any individual building containing townhouse dwelling units or multifamily dwelling units shall be 200 linear feet, regardless of the number of units
(g) For every 100 feet of building length, there shall be a planebreak along the facade comprised of an offset of at least five feet in depth by 25 feet in length. The offset shall extend from grade to the highest story.
(h) The street-facing front façades of buildings shall be articulated with wall offsets (e.g., projections or recesses in the façade plane) that are at least two feet deep and spaced no more than 30 feet apart.
(i) Corner buildings at street intersections shall incorporate architectural elements including prominent towers, cornice features, roof shapes and roof line variation

Page 280 of 314 ends

Chapter 4: Building Design Standards
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 19

4.2 Roof Forms
The California Energy Code (Title 24) requirements are to be considered in roof design, along with meeting the following standards:
(a) Maximize Solar Exposure. New homes are required to
have solar Design roofs for maximum solar exposure for the potential installation of solar features.
(b) Roof Mounted Equipment. Roof lines and roof forms shall be designed to screen roof mounted mechanical equipment. All screening shall be constructed consistent with the materials of the building and not simply “box-in” the equipment.

Page 281 of 314 ends

Color and material selections shall reinforce the style of the home. 20 CITY OF NORCO, CALIFORNIA

4.3 Materials and Colors
Building materials and colors shall reflect the architectural style of the development, and a cohesive palette shall be established and carried throughout the project.
(a) Avoid Unbroken Wall Planes. Where appropriate to the architectural style, materials and textures shall vary between the base and body of a building to break up large wall planes and add visual base to the building.
(b) Wrap Corners. Materials applied to any elevation shall turn the corner of the building, ending at a logical termination point related to the roof line or building massing, or a minimum of two feet.

Page 282 of 314 ends

Chapter 4: Building Design Standards
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 21

4.4 Garages and Carports
Garages are to be articulated to the same degree as other portions of the building, and shall adhere to the following standards:
(a) Garages and garage doors shall be located on secondary facades and designed to minimize their visual impact and minimize the dominance of garage doors on the street.
(b) Garage entries, loading and service entries, utility rooms, stairs, elevators, and other similar inactive elements shall occupy no more than 20% of the width of a public street facing building façade.
(c) Garage doors shall be designed consistent with the overall style of the building. Material, pattern, and color to be coordinated with architectural style.
(d) Where visible by the public or by other residents, garage entrances shall be recessed and/or accompanied by projecting elements like porches, bay windows, trellises, architectural ornament, and/or landscaping.
(e) All two-car garages shall have a minimum free and clear interior dimension of 20 feet x 20 feet, while one-car garages shall have a minimum dimension of 10 feet x 20 feet.
(f) Detached Structures. Carports, detached garages, and other ancillary structures shall be designed as an integral part of the development, and shall be constructed of complimentary material and colors.
(g) Carports should be compatible with the finish colors and materials of the primary building. Carports should be engineered to be solar ready.
2-CAR GARAGE - MIN. 20’X20’ * 1-CAR GARAGE - MIN. 10’X20’ * Example of well-articulated carports and garages.
* All measurements referenced in these garage size diagrams are referring to the interior dimensions. Add 6-7 inches per wall for exterior dimensions.

Page 283 of 314 ends

22 CITY OF NORCO, CALIFORNIA

Page 284 of 314 ends

Chapter 5: Architectural Style Standards
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 23
Chapter 5 - Architectural Style Standards

5.1 Intent & Purpose
The City of Norco General Plan calls for a cohesive and attractive built environment in harmony with both the natural and built environments.

New residential construction is to reflect the high level of quality of existing planned communities.

The articulation of cohesive architectural elements plays a key role in creating a positive community identity. A balance between authenticity of style and contemporary interpretations of historic elements is key to achieving an attractive multifamily community.

This chapter describes the Western architectural style which speaks to the heritage of Norco as well as aspirations for the future built environment of the City.

Page 285 of 314 ends

24 CITY OF NORCO, CALIFORNIA

5.2 Western Style

5.2.1 Style Description
Building architecture shall reflect a desired Western theme and identity. Derived from the American vernacular architecture that sprang from the passing of the Homestead Act of 1862, Frontier Architecture evolved to encompass the Victorian style during the later 19th centure when milled wood became widely available. This style combines simple, rustic, forms with Victorian embellishments to create a relaxed, informal feel compatible with the spirit of the American West. Qualities that reflect the Western theme can be described as rural, informal, traditional, rustic, low profile and equestrian oriented. Conversely, qualities that are inconsistent with the Western theme are urban, formal, contemporary, sophisticated, and massive.

Page 286 of 314 ends

Chapter 5: Architectural Style Standards
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 25

5.2.2 Form and Massing
Required Elements
(a) The basic building form shall be square or rectilinear, accentuated with a covered porch or walk;
(b) Buildings with facades greater than 100’ in length shall be divided into smaller, distinct masses by horizontally staggering walls, changing the roof line, inserting windows and doors, and applying wood siding in different directions; (c) Flat silhouettes shall be avoided. Buildings and building complexes shall be of variable heights to add visual
interest;
(d) Right angles shall predominate over curved walls or arches; (e) Expression of floor levels through ornamentation is required with such features as second floor balconies, upper level windows and exterior staircases.
a a
d
e
c

Page 287 of 314 ends

26 CITY OF NORCO, CALIFORNIA

5.2.3 Roof Design
Required Elements
(a) Principal roof forms shall be gable, gambrel, hip or shed; (b) Flat roofs are permitted where screened by a decorative parapet;
(c) Exposed rafter tails shall have a minimum thickness of 2 inches where a fascia board is used, and 4 inches where no fascia is used or where exposed on the underside of a porch or covered walk;
(d) Tower elements, chimneys, cupolas, exposed wood beams, roof overhangs, and trellises are acceptable roof features; (e) Skylights are permitted but shall be integral with the roof slope and design of the building;
a b
c c
d d

Page 288 of 314 ends

Chapter 5: Architectural Style Standards
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 27
Parapets (required elements when employed)
(f) Varied parapet height for multi-unit buildings are required; (g) Parapets shall completely screen roofs and all roof mounted equipment from view from the adjacent right-of-way;
(h) Parapets shall not be more than 5 feet above the main roofline;
(i) Parapets shall be finished on all sides visible from the ground;
(j) Parapets shall match the main building in material, color, and finish;
(k) Parapets shall utilize ornamental wood trim or a cornice at the top.
f
k
i
j

Page 289 of 314 ends

28 CITY OF NORCO, CALIFORNIA

5.2.4 Style Elements
Required Elements
(a) Wood posts shall be a minimum of 6x6 inches;
(b) Knee bracing at posts shall be used for balconies and overhangs;
(c) Balconies, boardwalks, and covered porches shall have wood railings;
Desired Elements
(d) The use of wood ornamentation at building cornices, the tops and bottoms of wood posts, eaves, balconies, and building corners is encouraged;
(e) The use of decorative elements on buildings such as weather vanes and wood ornamentation is encouraged;
(f) The use of trellis structures, windmills and other site amenities is encouarged; c d
e
a
f
b

Page 290 of 314 ends

Chapter 5: Architectural Style Standards
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 29
Façade Detailing
(g) Plaster and/or stucco is permitted but shall not exceed 60 percent of the building’s exterior surfaces;
(h) Horizontal siding shall be a minimum of 8 inches in width, and shall be one of the following types: horizontal “v” joint, channel joint ship lap with a minimum 3/8 inch channel, or beveled;
(i) Vertical board and batt siding shall have a minimum 12 inch spacing between 1x2-inch bats; rough-sawn sheets may be utilized;
g d

Page 291 of 314 ends

30 CITY OF NORCO, CALIFORNIA

5.2.5 Doors & Windows
Entries and Doors - Required Elements
(a) Building entries shall be accented architecturally through color, framing, and roof variations;
(b) Doors with windows shall have the appearance of divided sash, with the appearance of small individual panes
(preferably not exceeding 168 square inches, and not more than 13 inches on a side), the width of rectangular panes shall be shorter than their length;
(c) Doors shall be trimmed with wood;
Entries and Doors - Desired Elements
(d) Building entries that are recessed or which project outward with roof overhangs are encouraged;
(e) Doors shall be constructed of wood or have the appearance of wood construction;
d d

Page 292 of 314 ends

Chapter 5: Architectural Style Standards
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 31
Windows - Required Elements
(f) Divided sash windows shall have individual panes no more than 18 horizontal inches in any single dimension, and
window pane lengths shall be greater than widths;
(g) If windows other than divided sash are used, glazing shall be divided by non-continuous sections no greater than 36 inches by walls or columns;
(h) Window frames shall be wood or wood finish; metal windows may be utilized only if they are made to have the appearance and proportions of divided wood;
(i) Glazing shall consist of transparent glass, lightly tinted glass, lightly reflective solar glass with a reflective factor of 30 percent or less, or stained or etched glass; highly reflective glass, dark tinted glass, and colored glass are prohibited; (j) Awnings are not permitted;
(k) Front and visible edge elevations shall incorporate one feature window treatment, such as a picture window at least 6x8 feet, a window of unique shape and size, a window with a substantial surround matching or contrasting the primary color of the building, decorative window shelves or sill treatments, or a Juliet balcony;
Windows - Desired Elements
(l) Window decorations such as shutters and planter boxes are encouraged.
a
l
b

Page 293 of 314 ends

32 CITY OF NORCO, CALIFORNIA

5.2.6 Materials
Permitted Materials
(a) Uniform materials and consistent style shall be reflected on all exterior elevations;
(b) The primary exterior material of the building shall appear to be wood siding or adobe/plaster/stucco. River rock, flag stone, wrought iron, and brick may be used for architectural accent material but may not exceed 25 percent of the total building facade;
(c) Roofs shall be constructed of metal, concrete or asphalt tiles that simulate wood shingle. Spanish tile and standing seam metal roofing may also be used;
(d) Materials that simulate the appearance of wood, such as cement fiber siding, are acceptable;
b c
c

Page 294 of 314 ends

Chapter 5: Architectural Style Standards
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 CITY OF NORCO, CALIFORNIA 33

5.2.7 Desired Materials
(e) Exterior siding, rafter tails, beams, posts, trim and decking may be constructed of rough sawn lumber;
(f) The underside of eaves, porches and boardwalks may be wood planking;
(g) Exterior paving materials for courtyards, patios, and other outdoor gathering areas may utilize brick, interlocking concrete pavers, quarry tile, fired “mexican” pavers and stone;
Prohibited Materials:
(h) Highly finished wood shall be restricted to ornament and areas subject to human contact such as railings;
(i) The use of metals shall shall not have a shiny surface. As noted above, standing seam metal roofs may be used;
(j) The use of vinyl, masonite, and aluminum siding may be used when they are simulated to look like wood;
(k) Porcelain, plastic, and other manufactured materials are prohibited, except in fixtures, end caps on railings, and other similar locations;
(l) Exposed metal columns are prohibited;
(m) Prefabricated exterior metal stairs are prohibited; (n) Asphalt shall not be permitted for courtyards and patios. e

Page 295 of 314 ends

34 CITY OF NORCO, CALIFORNIA

5.2.8 Colors
Permitted Colors
(a) Primary building colors shall be earth tones of hues such as brown, beige, and gray; accent colors shall also be in earthen hues, but may include colors such as sky blue,
forest or sage green, barn red, white, black and other colors which compliment natural wood and do not detract from the western appearance of the buildings;
(b) Darker and lighter shades of the same color used on the building walls may be used to enhance building
ornamentation and trim;
(c) Exposed gutters, downspouts, flashing, sheet metal, vent stacks and pipes shall be painted to match adjacent roofs or walls to minimize their visibility;
(d) Stains or paints which provide the appearance of weathered wood are acceptable;
a

Page 296 of 314 ends

Chapter 5: Architectural Style Standards
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 CITY OF NORCO, CALIFORNIA 35 Prohibited Colors
(e) The use of “barn red” coloring shall be limited to accent trim and/or commons facilities such as clubhouses and pool
houses or tower elements;
(f) Except for small areas of ornamentation and trim, bright primary colors, or pinks, oranges and lavenders shall not be used;
(g) The use of more than two accent colors is prohibited; (h) Fluorescent colors are prohibited.
e

Page 297 of 314 ends

36 CITY OF NORCO, CALIFORNIA

Page 298 of 314 ends

Chapter 6: Administration
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 37
Chapter 6 - Administration

6.1 Administration of Standards
This chapter provides methodology for the implementation of the Objective Design Standards. The responsibilities of the City of Norco Planning Department Staff shall include administering, interpreting, and enforcing all requirements and standards of this document.

Interpretation and Severability
Unless otherwise provided herein, any ambiguity concerning the content or application of the Objective Design Standards shall be resolved by the City of Norco Planning Director (Director) or his / her designee in a manner consistent with the goals, policies, purpose, and intent established in this document. If any portion of these standards is declared to be invalid or ineffective in whole or in part, such decision shall not affect the validity of the remaining parts of the remaining portions thereof. Should there occur any interpretive conflict between this document and the City of Norco Municipal Code, the more restrictive standard shall take precedence.

Page 299 of 314 ends

38 CITY OF NORCO, CALIFORNIA

6.1.1 Other Reference Documents
The standards and development parameters unique to multifamily development are provided within this document and as such this document is the first source of direction regarding proposals, but it is not the only source. This section outlines the other documents pertaining to multifamily housing design, including the City of Norco General Plan, Norco Municipal Code, and other related City documents.

The City of Norco Planning Department will actively seek to clarify and maintain internal consistency between this document and other existing documents, including the following:

City of Norco General Plan
A General Plan is a statement of the community’s land use values and is the underlying basis for its vision and direction. The City of Norco General Plan serves as a long-term policy guide for the physical, economic, and environmental growth.

City of Norco Municipal Code
The City of Norco Municipal Code (Title 18) establishes districts throughout the City with permitted land uses and development standards. These development standards create the framework for the physical form of the community (building setbacks, heights, etc.).

Where the Objective Design Standards are silent, the Development Code will apply as appropriate.

Page 300 of 314 ends

Chapter 6: Administration
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 39

6.2 Definitions
Arcade. A roofed passageway or lane. A series of arches supported by columns, piers, or pillars, either freestanding or attached to a wall to form a gallery.

Arched. A curved or pointed structural element that is supported at its sides
Articulation. The distinct details, features, textures, or forms in relation to the whole facade.

Asymmetry. Irregular correspondence of form and configuration on opposite sides of a dividing line or plane or about a center or an axis; having unbalanced proportions.

Attached. Joined to or by a wall, especially by sharing a wall with another building; not freestanding.

Awning. A roof-like structure, often made of canvas, wood, or metal that serves as a shelter, as over a storefront, window, door, or deck.

Balcony. A platform that projects from the wall of a building and is surrounded by a railing, balustrade or parapet.

Board and Batten. A form of sheathing for wood frame buildings consisting of wide boards, usually placed vertically, whose joints are covered by narrow strips of wood over joints or cracks.

Brackets. A projection from a vertical surface providing structural or visual support under cornices, balconies, windows, or any other overhanging member.

Arcade
Porch
Gallery
Terrace

FRONTAGE TYPES

BOARD AND BATTEN

Page 301 of 314 ends

40 CITY OF NORCO, CALIFORNIA
Buffer. A term often applied to landscaped areas separating incompatible land uses. Can also mean an area of a “transitional” land use that lies between two incompatible land uses.

Canopy. A protective roof-like covering, often of canvas, mounted on a frame over a walkway or door or niche; often referred to as an awning.

Casement Window. A window with side hinges that swings outward from either the right or left.

Coping (Cap). A flat cover of stone or brick that protects the top of a wall.

Court. 1) An extent of open ground partially or completely enclosed by walls or buildings; a courtyard. 2) A short street, especially a wide alley walled by buildings on three sides. 3) A large open section of a building.

Curb Cut. The elimination of a street curb to enable increased access to crosswalks/sidewalks, entry driveways or parking lots.

Decorative Joinery. Embellishments or ornamental features used for decoration at the juncture of structural elements.

Detached. Standing apart from others; separate or disconnected.

Detail. An element of a building such as trim, moldings, other ornamentation or decorative features.

Dormer. A structure projecting from a sloping roof usually housing a vertical window that is placed in a small gable, or containing a ventilating louver.

Double-hung Windows. A window unit that has two operable sashes which move vertically in the frame.

COPING (CAP)

DECORATIVE JOINERY
DORMER

Page 302 of 314 ends

Chapter 6: Administration
OBJECTIVE DEVELOPMENT STANDARDS • MARCH 2, 2022 41
Downspout. A vertical pipe used to conduct water from a roof drain or gutter to the ground or cistern.

Eave. The projecting lower edge of a roof.

Eclectic. Selecting or employing individual elements from a variety of sources, systems, or styles.

Elevation. An orthographic view of the vertical features of a building (front, rear, side, interior elevation).

Facade. The entire exterior side of a building; especially the architectural front, sometimes distinguished from the other sides by elaboration of architectural or ornamental details.

Fascia.A plain horizontal band; a fascia board will cover the joint between the wall and the projecting eaves.

Fanlight. A semicircular window, usually over a door with radiating bars suggesting an open fan.

Gable Roof. A ridge roof that slopes up from only two walls. A gable is the vertical triangular portion of the end of a building from the eaves to the ridge of the roof.

Hipped (Hip Roof). A roof that is sloped on all four sides.

Knee Brace. A diagonal corner member for bracing the angle between two jointed members; being joined to each other partway along its path serves to stiffen and strengthen the joint.

Maintenance. The work of keeping something in proper condition; upkeep.

EAVE

GABLE ROOF HIP ROOF

KNEE BRACE
FASCIA

Page 303 of 314 ends

42 CITY OF NORCO, CALIFORNIA
Massing. The general shape, form, and size of a building.

Monument Sign. A ground sign with low overall height. Monument sign have the appearance of a solid base of landscape construction materials such as brick, stucco, stonework, textured wood, tile or textured concrete materials that is compatible with the building materials on the subject property.

Mullion. The vertical member separating adjacent windowpanes.

Multi-family. A multifamily home is any residential property that contains more than one housing unit, such as a duplex, a townhome or an apartment complex.

Muntin. Wood or metal strips separating panels in a window.

Niche(s). A decorative recess set into a wall for the purpose of displaying a statue, vase, font, or other object.

Overhanging Eaves. The projecting overhang at the lower edge of a roof that sheds rainwater.

Parapet. A retaining wall at the edge of a roof, porch, or terrace.

Pier. A vertical, non-circular masonry support, more massive than a column.

Pilaster. A rectangular column with a capital and base, set into a wall as an ornamental motif.

Pitch. To set at a specified downward slant, i.e. pitch the roof at a steep angle.

Porch. A covered platform, usually having a separate roof, at an entrance to a building. An open or enclosed gallery or room attached

MULLION AND MUNTIN
NICHE

Page 304 of 314 ends

Appendix A: Adopting Resolutions
OBJECTIVE DESIGN STANDARDS • DRAFT MONTH 2021 43
to the outside of a building; a veranda.

Portico. A structure consisting of a roof supported by columns or enclosed by walls, usually attached to a building as a porch.

Proportion. The relationship of size, quantity, or degree between two or more things or parts of something.

Rafter Tails. The portion of the rafter that hangs over the wall.

Rooflines. Various forms to a roof, such as pitch, ridge, hip, etc., often at different angles.

Scale. The proportion of one object to another. “Pedestrian” or “human” scale incorporates building and landscape elements that are modest in size. “Monumental” scale incorporates large or grand building elements.

Setback. 1) The recessing of the upper part of the facade due to the smaller area of the upper floors; 2) The distance a building is recessed from the property line, curb of the street, or the edge of the sidewalk.

Shed Roof. A roof shape having only one sloping pane.

Shingles. Thin pieces of wood used in overlapping rows to cover roofs and exterior walls of houses; can be cut in decorative shapes.

Shutter. A movable cover for a window used for protection from weather and intruders.

Siding. The exterior wall covering of a structure.

Sill. The horizontal exterior member at the bottom of a window or door opening, usually sloped away from the bottom of the window or

PORTICO

RAFTER TAILS

SHINGLES

Page 305 of 314 ends

44 CITY OF NORCO, CALIFORNIA
door for drainage of water and overhanging the wall below.

Streetscape. The overall appearance of a street or grouping of streets in an area and/or the relationship of buildings to the surrounding sidewalk and streets.

Stucco. A durable finish for exterior walls, usually composed of cement, sand, and lime and applied while wet. A fine plaster for interior wall ornamentation, such as moldings.

Symmetry. Exact correspondence of form and configuration on opposite sides of a dividing line or plane or about a center or an axis; having balanced proportions.

Townhome. An urban building without side yards, containing one residence on one or more floors.

Trellis. A system of horizontal joists supported on posts, often designed to support growing plants or provide shade.

Trim. Any visible woodwork or moldings that cover or protect joints, edges, or ends of another material. Examples: baseboards, cornices, door trim, and window trim.

Window Boxes. A long, narrow box in which flowers and other plants are grown, placed on an outside windowsill.

Window Sash. The moveable part of a window made up of the vertical and horizontal frame that holds the glass. WINDOW BOXES

Page 306 of 314 ends

Appendix A: Adopting Resolutions
OBJECTIVE DESIGN STANDARDS • DRAFT MONTH 2021 45
Appendix A - Adopting Resolutions

Page 307 of 314 ends
Page 308 of 314 ends

RESOLUTION 2022-18

A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF NORCO,

CALIFORNIA, ADOPTING OBJECTIVE DEVELOPMENT STANDARDS

TO BE COMPLIANT WITH STATE LAW FOR PROJECTS THAT

REQUIRE MINISTERIAL APPROVAL, AND TO ESTABLISH

DEVELOPMENT GUILDLINES/STANDARDS FOR PROJECTS IN THE

HOUSING DEVELOPMENT OVERLAY ZONE (HDO)
WHEREAS, the CITY OF NORCO initiated, a proposal to develop objective development standards applicable to the City of Norco, for compliance with state law (SB 35 and the 2021- 2029 Housing Element) for those projects that require ministerial approval and to establish development guidelines/standards for the HDO zone; and
WHEREAS, the Objective Development Standards was duly submitted to said City’s Planning Commission for decision at a public hearing for which proper notice was given; and WHEREAS, the Objective Development Standards was scheduled for public hearing on February 9, 2022 on or about 7 p.m. in the Council Chambers at 2820 Clark Avenue, Norco, California 92860; and
WHEREAS, at the time set, the Planning Commission held a public hearing and received both oral and written testimony pertaining to the Objective Development Standards; and WHEREAS, the Planning Commission adopted Resolution 2022-02 recommending that the City Council adopt the Objective Development Standards; and WHEREAS, the Objective Development Standards was duly submitted to said City’s, City Council for decision at a public hearing for which proper notice was given; and WHEREAS, the Objective Development Standards was scheduled for public hearing on March 2, 2022 on or about 7 p.m. in the Council Chambers at 2820 Clark Avenue, Norco, California 92860; and
WHEREAS, at the time set, the City Council held a public hearing and received both oral and written testimony pertaining to the Objective Development Standards; and WHEREAS, the City of Norco acting as the Lead Agency has determined in accordance with California Environmental Quality Act (CEQA) and the City of Norco Environmental Guidelines that the proposed Objective Development Standards could not have a significant effect on the environment, and an exemption was prepared for adoption.

NOW, THEREFORE, the City Council of the City of Norco does hereby approve the following FINDINGS AND DETERMINATIONS:

Page 309 of 314 ends

Resolution No. 2022-18 - Objective Development Standards March 2, 2022

Page 2 ends

I. FINDINGS:

A. The proposed Objective Development Standards will not be inconsistent with, or contrary to, the General Plan or the Zoning Code since the Objective Development Standards clarifies requirements legislation required by the State and as part of the City of Norco 2021-2029 Housing Element update.

B. The proposed Objective Development Standards will not create conditions materially detrimental to the public health, safety and general welfare.

C. The City of Norco acting as the Lead Agency has determined in accordance with California Environmental Quality Act (CEQA) and the City of Norco Environmental Guidelines that the proposed Objective Development Standards could not have a significant effect on the environment, and an exemption was prepared for adoption.

II. DETERMINATION:

NOW THEREFORE, in light of the evidence and testimony presented at the hearing, and in conformity with the findings set forth here, the City Council for the City of Norco, assembled March 2, 2022 does hereby adopt the Objective Development Standards (see Attachment ‘A’).

Page 310 of 314 ends

Resolution No. 2022-18 - Objective Development Standards March 2, 2022

Page 3 ends

PASSED AND ADOPTED by the City Council of the City of Norco, California at a regular meeting held March 2, 2022
__________________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
________________________
Dana Roa, CMC, City Clerk
City of Norco, California
I Dana Roa, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was adopted by the City Council of the City of Norco, California at a regular adjourned meeting held March 2, 2022 by the following roll call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS THEREOF, I have hereunto set my hand and affixed the official seal of the City of Norco, California, on March 2, 2022.
_________________________
Dana Roa, CMC, City Clerk
City of Norco, California
Attachment A: Objective Development Standards

Page 311 of 314 ends

ORDINANCE 1080

A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF NORCO,
CALIFORNIA APPROVING ZONE CODE AMENDMENT 2021-04,
AMENDING CHAPTERS 18.02 “DEFINITIONS”, 18.17 “R-3 LOWDENSITY MULTI-FAMILY RESIDENTIAL”, AND 18.64 “HOUSING DEVELOPMENT OVERLAY ZONE”, TO BE COMPLIANT WITH STATE

LAW FOR PROJECTS THAT REQUIRE MINISTERIAL APPROVAL,

AND TO CODIFY DEVELOPMENT GUIDELINES/STANDARDS FOR

PROJECTS IN THE HOUSING DEVELOPMENT OVERLAY ZONE
(HDO)
WHEREAS, the CITY OF NORCO initiated Zone Code Amendment 2021-04, a proposal to amend Chapter 18.02, 18.17, and 18.64 of the Norco Municipal Code Title 18 (Zoning Code), for compliance with State Law (SB 35 and the 2021-2029 Housing Element) for those projects that require ministerial approval and to establish development guidelines/standards for the HDO Zone; and
WHEREAS, the Zone Code Amendment was duly submitted to said City’s Planning Commission for decision at a public hearing for which proper notice was given; and WHEREAS, the Zone Code Amendment was scheduled for public hearing on February 9, 2022 on or about 7 p.m. in the Council Chambers at 2820 Clark Avenue, Norco, California 92860; and
WHEREAS, at the time set, the Planning Commission held a public hearing and received both oral and written testimony pertaining to the Zone Code Amendment; and WHEREAS, the Planning Commission adopted Resolution No. 2022-03 recommending that the City Council adopt the Zone Code Amendment; and WHEREAS, the Zone Code Amendment was duly submitted to said City’s City Council for decision at a public hearing for which proper notice was given; and WHEREAS, the Zone Code Amendment was scheduled for its First Reading at a public hearing on March 2, 2022 on or about 7 p.m. in the Council Chambers at 2820 Clark Avenue, Norco, California 92860; and
WHEREAS, at the time set, the City Council held a public hearing and received both oral and written testimony pertaining to the Zone Code Amendment; and WHEREAS, the City of Norco acting as the Lead Agency has determined in accordance with California Environmental Quality Act (CEQA) and the City of Norco Environmental Guidelines that the proposed Objective Development Standards could not have a significant effect on the environment, and an exemption was prepared for adoption.

NOW, THEREFORE, the City Council of the City of Norco, California, does hereby approve the following FINDINGS AND DETERMINATIONS:

Page 312 of 314 ends

Ordinance 1080
March 16, 2022

Page 2 ends

I. FINDINGS:

A. The proposed Zone Code Amendment will not be inconsistent with, or contrary to, the General Plan or the Zoning Code since the Objective Development Standards clarifies requirements legislation required by the State and as part of the City of Norco 2021-2029 Housing Element update.

B. The proposed Zone Code Amendment will not create conditions materially detrimental to the public health, safety and general welfare.

C. The City of Norco acting as the Lead Agency has determined in accordance with California Environmental Quality Act (CEQA) and the City of Norco Environmental Guidelines that the proposed Objective Development Standards could not have a significant effect on the environment, and an exemption was prepared for adoption.

II. DETERMINATION:

NOW THEREFORE, in light of the evidence and testimony presented at the hearing, and in conformity with the findings set forth here, the City Council for the City of Norco, assembled March 2, 2022 does hereby adopt Zone Code Amendment 2021-04 in its First Reading, and March 16, 2022 for a Second Reading, thereby amending the Norco Municipal Code Chapters 18.02, 18.17, and 18.64 as follows:
• Chapter 18.02 “Definitions” is proposed to be amended by adding a new definition for ODS. The definition is proposed to read: "Objective Development Standards: Those that “involve no personal or subjective judgement by a public official and are uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant and public official prior to submittal.”; and
• Chapter 18.17 “R-3 Low Density Multiple-Family Residential” is proposed to be amended by adding a new section:
o Section 18.17.44, to read as follows: "Any project within the R-3 zone that qualifies for ministerial approval in compliance with State law shall follow the Objective Development Standards adopted by the City"; and • Chapter 18.64 “Housing Development Overlay (HDO) Zone” is proposed to be amended by adding the following new sections:
o Section 18.64.14 R. Any project within the HDO zone that qualifies for ministerial approval in compliance with State law shall follow the Objective Development Standards adopted by the City".
o Section 18.64.14 S. The Objective Development Standards adopted by the City of Norco shall serve as the design and developments standards/guidelines for all projects that are not subject to ministerial approval. When not subject to ministerial approval, these standards can be modified at the discretion of the Planning Commission and/or the City Council.

Page 313 of 314 ends

Ordinance 1080
March 16, 2022

Page 3 ends

PASSED AND ADOPTED by the City Council of the City of Norco, California at a regular meeting held March 16, 2022.
________________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
________________________
Dana Roa, CMC, City Clerk
City of Norco, California
I, Dana Roa, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was adopted by the City Council of the City of Norco, California, at a regular adjourned meeting held March 16, 2022, by the following roll call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS THEREOF, I have hereunto set my hand and affixed the official seal of the City of Norco, California, on March 16, 2022.
_________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 314 of 314 ends
← All documents from this meeting