Cities Index.
Agenda

Norco City Council
April 17, 2024

Document
Agenda
Meeting
April 17, 2024
Body
Norco City Council
Pages
628
Original file
110.4 MB
Text extracted from the city's file for reading and search. Open the original on norco.civicweb.net. That file is the official record.

Norco Boundaries
40 Bicycle Collisions
There were 12 bicycle crashes during the study period, of which 1 (8%) resulted in a severe injury. 25% of these crashes were a result of the person biking on the wrong side of the road, and 25% were from a person driving doing an improper turning movement. 92% of the victims in these bicycle crashes were male.

Unlike the pedestrian collisions concentrated in the center of the City, the bicycle collisions are mostly dispersed along the edges of Norco (Figure 18).

Page 161 of 628 ends

41 Figure 18. Bicycle Collisions 2017-2021

C O R O N A

WARFARE CTR

S U R F A C E
NAVAL

P A R K

RIVERVIEW

CROSSROADS

P A R K

RIVER TRAILS

P A R K

BUTTERFIELD

P A R K

PRADO BASIN

CAM PU S

N O R C O

COLLEGE -

COMMUNITY

RIVERSIDE
U

AIRPORT

MUNICIPAL
CORONA
Norco
91 15
River
Trails
Park
Makin/Shearer
Sports Complex
Ingalls Park
Doty
P
Hidden Valley
Wildlife Area
Corydon
Staging
Area

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND

PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDEN VALLEY PKWY

FIFTH ST

FIRST ST

CORYDON AVE

FOURTH ST

RIVERRD

NORCO DR

SIXTH ST

EVA EDISLLIH

EVA RENMAH
Santa Ana
River
Lake
Norconian

EASTVALE

JURUPA VALLEY
RIV
CORONA
NORCO
NORCO

BICYCLE COLLISIONS
2017-2021

BICYCLIST COLLISION
Bike Collision with Injury
0 0.5 1 MILES

BASEMAP
Parks
Water Bodies
Norco College
Navy Base
Norco Boundaries

Page 162 of 628 ends

42 Active Transportation Programs
Active transportation programs help pedestrians and bicyclists understand the full potential of an active transportation network, and can help all road users understand how to share the public right of way. These type of programs can also increase the accessibility to walking and biking options for residents, and can encourage people who typically drive to try walking and biking for transportation.

Communities that have high rates of active transportation usage often use a “6E’s” approach9:
• Education: Provide information to pedestrians, bicyclists, and drivers related to safely sharing the road. Educate residents about the environmental and financial benefits of using active transportation.
• Encouragement: Promote active transportation as fun and efficient methods of transportation, and provide special events that encourage walking and biking.
• Engagement : Promote community-based engagement
around unsafe travel behaviors to help establish norms and expectations of those using active transportation and those driving motor vehicles.
• Engineering: Install bicycle and pedestrian physical
infrastructure to support safe and comfortable active
transportation.
• Equity: All community members, particularly those from underrepresented communities, should have equal access
9 National Partnership for Safe Routes to School, 2020. https://www. saferoutespartnership.org/safe-routes-school/101/6-Es.
to active transportation. Programming materials should be strategically targeted to reach these communities.
• Evaluation: The City should monitor the success of the programming efforts to ensure the programs are achieving the desired outcomes.

The following list describes the existing programs in Riverside County.

Inland Empire Biking Alliance (IEBA)
IEBA is a non-profit that helps to make walking and biking safer in the Inland Empire, including Riverside County. The organization hosts a Kid’s Bicycle Ambassador Program in which IEBA staff teach older children riding skills, safety, bicycle mechanics, and advanced riding. IEBA also partners with bicycle friendly businesses to encourage a strong cycling community.

Bicycle skills classes, like this one in Santa Clarita, can help children learn the rules of the road.

Page 163 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
43 Riverside Bicycle Club
The Riverside Bicycle Club organizes group rides throughout the Inland Empire for all skill levels, including group rides on the trails on the perimeter of Norco. Group rides can encourage bicyclists to gain confidence and learn on-street bike riding skills.

Riverside County Transportation Commission (RCTC)
RCTC encourages residents in Riverside County to try alternative modes of transportation through events like Bike Month, in which RCTC suggests biking to school and work.

Riverside County Sheriff
In other cities in Riverside County, the Sheriff’s Department has conducted traffic safety operations along corridors with high bicycle and pedestrian related collisions. During these operations, the Sheriff’s Department issues citations for common violations such as failing to yield to bicyclists or pedestrians or failing to stop at stop signs.

Group rides, like this example in San Gabriel, can help bicyclists gain confidence and learn the rules of the road.

Page 164 of 628 ends

44 02 needs analysis

Page 165 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
45 Needs Analysis
The City of Norco Pedestrian and Bicycle Master Plan is the City’s effort to enable walking and biking connections around Norco.

This Plan will expand the active transportation network, improve transportation options for people of all ages and abilities, and ensure interconnectivity between key destinations around Norco.

This Plan will build on the existing pedestrian and equestrian trails and bicycle routes within the City.

The purpose of this Needs Analysis is to identify and evaluate the gaps in the existing network. The Needs Analysis considers network safety, network connectivity, access to destinations, and potential demand for bicycle and pedestrian trips in and around Norco. This information will provide additional insight to the challenges and opportunities for alternative transportation throughout the City and will be used to identify network needs and safety improvements.

A comprehensive understanding of the Needs Analysis is
necessary to develop a plan for the future that will ultimately improve multi-modal transportation options. This data and analysis, in combination with public input, will drive the decision making behind the subsequent recommendations for the
improvement of walking and bicycling infrastructure in Norco.

This document identifies the gaps in the existing network and addresses safety, connectivity, demand and accessibility within the existing network.

Trails are common throughout the City of Norco.

Page 166 of 628 ends

46 Several types of analyses were conducted in the needs assessment. These include:
• Level of Traffic Stress: It is important to understand how stressful different routes and roadways conditions are perceived by the average rider and walker. In order to increase bicycle ridership and pedestrian use, the routes that provide access to the most prominent destinations need to feel safe for all users. • Live Work Play Latent Demand Analysis: This analysis
estimates the underlying demand for bicycle and pedestrian facilities. The results summarize the geographic distribution of demand for bicycle and pedestrian facilities. The results will help inform and prioritize recommendations for bicycle and pedestrian infrastructure improvements.
• Walkability Analysis: This analysis looks at the walk and bicycle sheds of two new business developments in Norco: Palomino Business Park and Norco Valley Square. The new development will help inform pedestrian and cycling improvements in the surrounding area, leading to the improvement and success of the new developments.
• Equity Analysis: This analysis overlays CalEnviroScreen and Healthy Places Index data with Level of Traffic Stress and the Live Work Play analyses to determine if there are neighborhoods that are more negatively affected by unsafe street conditions. This can help prioritize future projects by focusing on the most impacted neighborhoods first.
• Regional Connectivity Analysis: This analysis establishes a 6 mile buffer around Norco, which accounts for an hour or less bike ride, and identifies major destinations and points of connectivity which could help prioritize regional connections.
• Schools Analysis: This analysis identifies each school in Norco and analyzes the existing conditions, demographics, and points of potential improvements to increase safety for students, parents, and faculty to encourage walking and biking to schools.

Page 167 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
47 Level of Traffic Stress
Level of Traffic Stress (LTS) is a metric used to
determine the level of comfort for a person walking
or biking on a street. The analysis takes into account
facilities, speeds, number of lanes, and traffic
volumes to determine the comfort of the street for
non-driving users. It is broken down into two metrics,
Bicycle Level of Traffic Stress and Pedestrian Level
of Traffic Stress.

The diagram to the right depicts the roadway
conditions and the scale of level of traffic stress.

Lower levels of traffic stress, LTS 1 and 2, offer
the lowest barrier of entry to people walking and
bicycling by creating an street environment where
all ages and skill levels feel comfortable on the
street.

Overview of Level of Traffic Stress (LTS)

Page 168 of 628 ends

48 • BLTS 4 represents high-stress roadways where only strong and fearless bicyclists would feel comfortable riding. These roadways are generally characterized by high volumes, high speeds, several travel lanes, and complex transitions approaching and crossing intersections.

The results of the BLTS analysis helps identify existing areas that are low-stress for many bicyclists, and identifies the degree to which roadways must be improved in order to provide a comfortable experience for riders of all ages and abilities.

Additionally, scenario testing can be used to determine how a roadway or route’s level of stress may change with improvements.

Norco has a few high-stress arterial roads, but a large network of low-stress roadways within neighborhoods that can provide a bicycle friendly environment. Connecting these low-stress networks across the high-stress arterials can drastically improve bicycling and walking conditions in Norco.

Bicycle Level of Traffic Stress
The Bicycle Level of Traffic Stress (BLTS) analysis estimates the level of comfort for people biking on a given roadway segment.

BLTS helps to identify where “gaps” or deficiencies in a bike network exist, and provides a measure of how likely different types of riders, based on ability and comfort level, are to use the facility. Alta’s BLTS analysis methodology is adapted from the 2012 Mineta Transportation Institute Report 11-19: Low-Stress Bicycling and Network Connectivity.10 LTS is determined by characteristics of a given roadway segment that affect a bicyclist’s perception of safety and comfort, including posted speed limit, number of travel lanes, and the presence and character of bicycle lanes. The combination of this criteria classifies a road segment into one of four levels of traffic stress:
• BLTS 1 represents roadways where bicyclists of all ages and abilities would feel comfortable riding. These roadways are generally characterized by low volumes, low speeds, no more than two travel lanes, and traffic control measures at intersections.

These roadways may have bicycle facilities; separated shareduse paths for bicycles also fall into this category. • BLTS 2 represents slightly less comfortable roadways, where most adults would feel comfortable riding.
• BLTS 3 represents moderately uncomfortable roadways, where most experienced bicyclists would feel comfortable riding. 10  Mineta Institute. Mekuria M., Furth P., Nixon H. Low-Stress Bicycling and Network Connectivity. 2012. https://transweb.sjsu.edu/research/Low-StressBicycling-and-Network-Connectivity

Page 169 of 628 ends

49 Figure 19. Bicycle Level of Traffic Stress
!
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !
River
Trails
Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Doty Tr
Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
91 15

PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENVALLEY PKWY

HAMNER AVE

FIFTH ST

NORTH DR

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY

CLE LEVEL

RAFFIC STRESS
E LTS

0.45 0.9 MILES
AP
Schools
Navy Base
Norco College
Bus Stop
City Boundary
Future Development
!
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !
River
Trails
Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
15 PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENVALLEY PKWY

HAMNER AVE

FIFTH ST

NORTH DR

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY

BICYCLE LEVEL

OF TRAFFIC STRESS

BICYCLE LTS
1 2
3 4
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
Future Development

Page 170 of 628 ends

50 Pedestrian Level of Traffic Stress
The Pedestrian Level of Traffic Stress (PLTS) analysis estimates the level of comfort for people walking on a given roadway segment. PLTS helps identify where “gaps” or deficiencies in a pedestrian network exist, and provides a measure of how likely pedestrians are to use the facility, based on ability and comfort level.

Alta’s PLTS analysis methodology is adapted from the Oregon Department of Transportation (ODOT)‘s Analysis Procedures Manual and is intended as a companion for Bicycle Level of Traffic Stress (BLTS).11 PLTS is determined by characteristics of a given roadway segment that affect a pedestrian’s perception of safety and comfort including sidewalk presence and width, sidewalk buffer width and type, posted speed limit, and number of travel lanes. PLTS scores classify road segments into one of four levels of traffic stress and, while similar to bicycle LTS scores, PLTS considers the level of attention required in addition to the user experience:
• PLTS 1 represents roadways where pedestrians of all ages and abilities would feel comfortable walking and require little attention to traffic.
• PLTS 2 represents slightly less comfortable roadways that require more attention to traffic and are suitable for children over 10, teens and adults.
11 Oregon Department of Transportation, Transportation Development Division Planning Section: Transportation Planning Analysis Unit. 2020.

Analysis Procedures Manual Version 2. https://www.oregon.gov/odot/ Planning/Pages/APM.aspx
• PLTS 3 represents moderately uncomfortable roadways, where most able-bodied adults would feel uncomfortable but safe. • PLTS 4 represents high traffic stress and would be used only by able-bodied adults with limited route choices.

The results of the PLTS analysis helps identify existing areas that are low-stress for pedestrians, and identifies the degree to which roadways must be improved in order to provide a comfortable experience for pedestrians of all ages and abilities. Additionally, scenario testing can be used to determine how a roadway or route’s level of stress may change with improvements. The analysis is intended for use in urban areas specifically; while it can be used in rural conditions where pedestrian facilities exist, the methodology will yield a high PLTS score (greatest discomfort) where higher speed traffic is present.

Similar to the Bicycle Level of Traffic Stress, Norco has a few highstress arterials that act as barriers between low-stress networks.

The design of these streets in Norco is intentional. The lack of dedicated sidewalks is compensated for by an expansive network of wide, sometimes fenced, pedestrian trails, wide shoulders and relatively low trafficked streets. According to the Norco General Plan and the Comprehensive Trail Master Plan, the trail system is meant to provide access for both equestrians and pedestrians between neighborhoods, parks, schools, and open space.

Page 171 of 628 ends

51 Figure 20. Pedestrian Level of Traffic Stress
!
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !
River
Trails
Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Doty Tr
Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
91 15

PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENVALLEY PKWY

HAMNER AVE

FIFTH ST

NORTH DR

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY

STRIAN LEVEL

RAFFIC STRESS

RIAN LTS

0.45 0.9 MILES
AP
Schools
Navy Base
Norco College
Bus Stop
City Boundary
Future Development
!
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !
River
Trails
Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
15 PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENVALLEY PKWY

HAMNER AVE

FIFTH ST

NORTH DR

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY

PEDESTRIAN LEVEL

OF TRAFFIC STRESS

PEDESTRIAN LTS
1 2
3 4
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
Future Development

Page 172 of 628 ends

52 Network Gap Analysis
The Network Gap Analysis evaluates the bicycle and pedestrian connectivity of existing low-stress areas of Norco based on the BLTS and PLTS analyses. This exercise helps highlight the barriers that high-speed roadways, freeways, and railroad tracks create between neighborhoods. A low-stress connection requires both segments and intersections to accommodate low-stress travel. For example, if a corridor is considered a stressful roadway, enhanced crossings may be needed to provide a comfortable crossing experience for cyclists and pedestrians traveling between neighborhoods.

Elements that promote low-stress connectivity between areas of the City could include:
• Signalized intersections
• High visibility crosswalks with flashing beacons
• Low-speed roadways, bridges or tunnels bypassing highspeed streets High-stress barriers create an unsafe and unpleasant environment for people traveling by foot, public transit or bicycle and can inhibit access to parts of the City without a car. By identifying where barriers are within Norco, this Plan can make recommendations for crossings and connections between low-stress areas to create a more holistic and expansive network of bicycle and pedestrian infrastructure around Norco.

The maps on the following pages show Low Stress Network Islands and the barriers that separate them. The Low Stress Networks are defined by roads that have a LTS score of 1 or 2.

Roads with scores of 3 or 4 and separate pockets of low-stress areas are identified as barriers. Creating links and safe crossings across these barriers will help to create a more cohesive and safe network of walking and bicycling infrastructure in Norco.

Pedestrian Network Gap Analysis
As seen in Figure 21, the Low Stress Pedestrian Network is broken up into four main, discrete areas. Hamner Avenue and I-15 act as major barriers through the center of Norco. Additionally, Sixth Street and Fourth Street separate Low Stress Networks on the east side of the City. These high-stress streets act as barriers between the Low Stress Networks and present an opportunity to create dedicated and purposeful crossings between the islands.

Bicycle Network Gap Analysis
Similar to the Pedestrian Network Gaps, Hamner Avenue and I-15 serve as major barriers between low-stress islands on the east and west sides of Norco. Additionally, Norco Boulevard is a highstress corridor separating pockets on the west side of the City. On the east side, the Low Stress Network is much more cohesive with Sixth Street as the only major high-stress barrier.

Page 173 of 628 ends

53 Figure 21. Pedestrian Network Gap Analysis Map
!
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !

TRIAN LEVEL

FFIC STRESS -

RK GAP ANALYSIS
N LTS
GAP

0.45 0.9 MILES
ools
h Stress Barrier Between
Stress Networks
Stress Island
y Base
co College
Stop
Boundary
re Development
River
Trails
Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Doty Tr
Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
91 15

PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENVALLEY PKWY

HAMNER AVE

FIFTH ST

NORTH DR

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY
!
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !

PEDESTRIAN LEVEL

OF TRAFFIC STRESS -

NETWORK GAP ANALYSIS

PEDESTRIAN LTS

NETWORK GAP
1 2
0 0.45 0.9 MILES

BASEMAP
! Schools
High Stress Barrier Between
Low Stress Networks
Low Stress Island
! Navy Base
! Norco College
! Bus Stop
City Boundary
Future Development
River
Trails
Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Doty Trust
Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
91 15

PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENVALLEY PKWY

HAMNER AVE

FIFTH ST

NORTH DR

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY
!
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !
River
Trails
Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
15 PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENVALLEY PKWY

HAMNER AVE

FIFTH ST

NORTH DR

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY

PEDESTRIAN LEVEL

OF TRAFFIC STRESS

PEDESTRIAN LTS
1 2
3 4
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
Future Development
!
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !

PEDESTRIAN LEVEL

OF TRAFFIC STRESS -

NETWORK GAP ANALYSIS

PEDESTRIAN LTS

NETWORK GAP
1 2
0 0.45 0.9 MILES

BASEMAP
! Schools
High Stress Barrier Between
Low Stress Networks
Low Stress Island
! Navy Base
! Norco College
! Bus Stop
City Boundary
Future Development
River
Trails
Park
Promenade
Park
Hidden
Wildlife
Makin/Shearer
Sports
Complex
Ingalls Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
15 PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENVALLEY PKWY

HAMNER AVE

FIFTH ST

NORTH DR

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY

Page 174 of 628 ends

54 Figure 22. Bicycle Network Gap Analysis Map
!
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !

LE LEVEL OF

FIC STRESS

ORK GAP ANALYSIS
LTS

0.45 0.9 MILES
P
Schools
Navy Base
Norco College
Bus Stop
City Boundary
uture Development
K GAP
High Stress Barrier Between
ow Stress Networks
ow Stress Island
River
Trails
Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Doty Tru
Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
91 15

PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENVALLEY PKWY

HAMNER AVE

FIFTH ST

NORTH DR

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY
!
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !

BICYCLE LEVEL OF

TRAFFIC STRESS

NETWORK GAP ANALYSIS

BICYCLE LTS
1 2
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
Future Development

NETWORK GAP
High Stress Barrier Between
Low Stress Networks
Low Stress Island
River
Trails
Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Doty Trust
Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
91 15

PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENVALLEY PKWY

HAMNER AVE

FIFTH ST

NORTH DR

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY
!
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !
River
Trails
Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
15 PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENVALLEY PKWY

HAMNER AVE

FIFTH ST

NORTH DR

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY

PEDESTRIAN LEVEL

OF TRAFFIC STRESS

PEDESTRIAN LTS
1 2
3 4
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
Future Development
!
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !

BICYCLE LEVEL OF

TRAFFIC STRESS

NETWORK GAP ANALYSIS

BICYCLE LTS
1 2
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
Future Development

NETWORK GAP
High Stress Barrier Between
Low Stress Networks
Low Stress Island
River
Trails
Park
Promenade
Park
Hidde
Wildl
Makin/Shearer
Sports
Complex
Ingalls Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
15 PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENVALLEY PKWY

HAMNER AVE

FIFTH ST

NORTH DR

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY

Page 175 of 628 ends

55 This page intentionally left blank

Page 176 of 628 ends

56 Live Work Play Latent Demand Analysis
To quantify and visualize demand for walking and bicycling trips within Norco, a “Live Work Play” demand analysis was conducted.

This analysis is an objective, data-driven process that estimates the cumulative demand for bicycle and pedestrian facilities depending on where people live, work, play, shop, learn and access transit. This is accomplished by quantifying factors that generate pedestrian and bicyclist trips. The resulting composite demand maps summarize the geographic distribution of demand for bicycle and pedestrian facilities throughout the study area.

These results will inform and prioritize recommendations for bicycle and pedestrian infrastructure improvements, along with other key analyses focusing on safety and network gaps.

The Live Work Play demand analysis model provides a general understanding of expected bicycle and pedestrian activity by analyzing spatial data representative of origins and destinations in the study area. In the model, demand is influenced by where people live, work, play, learn and access transit. The resulting analysis shows where people are likely to walk and bike and based upon the demand model inputs.

Demand Model Inputs
Where People Live: These locations represent potential trip origin locations. More active transportation trips can be made in areas with higher population density if supporting infrastructure exists.

Where People Work: This category represents trip ends for people working in Norco, regardless of residency. Depending on the type of job, employment can act as a trip attractor (i.e., retail stores or cafes), trip generator (i.e., office parks and buildings), or both.

Where People Play: This category is a combination of recreation land use types and destinations such as parks, trails, and other land open to public recreation.

Where People Learn: This category shows the locations of all educational facilities within the City, including elementary, middle and high schools, as well as college and university campuses.

Where People Access Transit: This category represents bus stops within Norco. Stops with higher ridership signify more popular destinations than stops with lower ridership.

Categorical data representing each demand factor (i.e., population, employment, work, play) were applied to the following maps. Each hexagon was assigned a score from 1 to 5 for each demand factor based on the density or coverage within that hexagon. The color of each hexagon in the following maps represent high- or lowdemand areas within Norco.

As seen in the analysis in Figures 23 through 26, there are two major pockets of high bike demand in Norco, both originating from primarily residential areas. These neighborhood streets are relatively low-stress streets with high populations and short travel distances to destinations. On the west side of Norco, notice the high demand trail that leads to Norco College, suggesting a more formal connection between the neighborhood and the college would be useful. By improving connections within and between these high demand areas, the City of Norco can greatly improve the effectiveness of its bicycling infrastructure.

For both the latent walk and biking demand, there is a strong correlation with the areas of high demand and the high level of traffic stress arterials that act as barriers between many of the low stress pockets. One of the most striking examples of this is

Page 177 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
57 Hamner Avenue, which has some of the highest latent demand in the City but also is one of the highest stress streets and acts as a barrier between the eastern half of Norco and the western half. These high demand and high-stress streets should have high priority for improvements to make them safer and more comfortable for pedestrians and cyclists.

Page 178 of 628 ends

58 Figure 23. Latent Bike Demand Map
!
!
!!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
River
Trails
Park
Hidden Valley
Wildlife Area
Ingalls
Park
Santa Ana
River
Lake Norconian
91 15

AV E PARKRIDGE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

FIFTH ST

HILLSIDE AVE

FIRST ST

CORYDONAVE

FOURTH ST

RIVER RD
NORCO
D
R

SIXTH ST
Park

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND

JURUPA VALLEY

EASTVALE
CORONA
RIV

LATENT BIKE
DEMAND

RELATIVE LATENT

BIKE DEMAND
High Demand
Low Demand
0 0.45 0.9 MILES
BASEMAP ! Schools ! Navy Base ! Norco College ! Bus Stop City Boundary

Page 179 of 628 ends

59 Figure 24. Latent Bike Demand With Network Gaps Map
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!

LATENT BIKE

DEMAND AND

GAP ANALYSIS

RELATIVE LATENT

BIKE DEMAND

NETWORK GAP
High Demand
Low Demand
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
High Stress Barrier Between
Low Stress Networks
River
Trails
Park
Hidden Valley
Wildlife Area
Ingalls
Park
Park
Santa Ana River
Lake
Norconian
91 15
AV E

PARKRIDGE

SECOND ST

EVA AINROFILAC
TEM

ESCAL AVE
VALLEY

P K W Y
HIDDEN

HAMNER AVE

FIFTH ST

EVA EDISLLIH

FIRST ST
CORY
D
O
N
AVE

FOURTH ST

RIVER RD

NORCO DR

SIXTH ST

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND

EASTVALE

JURUPA VALLEY
CORONA
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!

LATENT BIKE

DEMAND AND

GAP ANALYSIS

RELATIVE LATENT

BIKE DEMAND

NETWORK GAP
High Demand
Low Demand
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
High Stress Barrier Between
Low Stress Networks
River
Trails
Park
Hidden Valley
Wildlife Area
Ingalls
Park
Park
Santa Ana River
Lake
Norconian
15 AV E

PARKRIDGE

SECOND ST

EVA AINROFILAC
TEM

ESCAL AVE
VALLEY

P K W Y
HIDDEN

HAMNER AVE

FIFTH ST

EVA EDISLLIH

FIRST ST
CORY
D
O
N
AVE

FOURTH ST

RIVER RD

NORCO DR

SIXTH ST

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND

EASTVALE

JURUPA VALLEY
CORONA

Page 180 of 628 ends

60 Figure 25. Latent Walk Demand Map
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
! !
!
!
!
River
Trails
Park
Hidden Valley
Wildlife Area
Ingalls
Park
Santa Ana
River
Lake Norconian
91 15
AV E

PARKRIDGE

SECOND ST

EVA AINROFILAC
TEM

ESCAL AVE
VALLEY

P K W Y
HIDDEN

FIFTH ST

HILLSIDE AVE

FIRST ST
CORY
D
O
N
AVE

FOURTH ST

RIVER RD

NORCO DR SIXTH ST

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND

JURUPA VALLEY

EASTVALE
CORONA
RIV

LATENT WALK
DEMAND

RELATIVE LATENT

WALK DEMAND
High Demand
Low Demand
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
Park

Page 181 of 628 ends

61 Figure 26. Latent Walk Demand with Network Gaps Map
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
! !
!
!
!

LATENT WALK

DEMAND AND

GAP ANALYSIS

LATENT WALK DEMAND
High Demand
Low Demand
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary

NETWORK GAP
High Stress Barrier Between
Low Stress Networks
River
Trails
Park
Hidden Valley
Wildlife Area
Ingalls
Park
Park
Santa Ana River
Lake
Norconian
91 15
AV E

PARKRIDGE

SECOND ST

EVA AINROFILAC
TEM

ESCAL AVE
PKW Y

HIDDE N VALLEY

HAMNER AVE

FIFTH ST

EVA EDISLLIH

FIRST ST
CORY
D
O
N
AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND

JURUPA VALLEY

EASTVALE
CORONA
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
! !
!
!
!

LATENT WALK

DEMAND AND

GAP ANALYSIS

LATENT WALK DEMAND
High Demand
Low Demand
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary

NETWORK GAP
High Stress Barrier Between
Low Stress Networks
River
Trails
Park
Hidden Valley
Wildlife Area
Ingalls
Park
Park
Santa Ana River
Lake
Norconian
15 AV E

PARKRIDGE

SECOND ST

EVA AINROFILAC
TEM

ESCAL AVE
PKW Y

HIDDE N VALLEY

HAMNER AVE

FIFTH ST

EVA EDISLLIH

FIRST ST
CORY
D
O
N
AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND

JURUPA VALLEY

EASTVALE
CORONA

Page 182 of 628 ends

62 Walkability Analysis
This analysis looks at the bicycle and walksheds for two new developments in Norco: the Palomino Business Park and the Norco Valley Square development. Travel access sheds were calculated in ArcGIS and show the area accessible via walking or biking within a certain travel time, starting from the future development site. Walking and biking speeds are assumed to be 3 mph and 10 mph, respectively, and user movement is restricted to the existing network of sidewalk, streets and bike lanes.

Palomino Business Park
The Palomino Business Park project, which started construction in Spring 2022, is set to develop over 110 acres of land for industrial, commercial and office uses. The business park will be the largest industrial development in the City, located on Mountain Avenue between Second Street and First Street. The business park will include the construction and maintenance of trails on all sides of the site.

As shown in Figure 27 and 28, First and Second Street are crucial to the connectivity of the surrounding area. Improvements along these corridors will greatly improve the pedestrian and cycling experience for visitors of the new development. Hamner Avenue and River Road are also key corridors providing the most efficient access to other parts of the City.

The Palomino Business Park will be Norco’s largest industrial development.

Page 183 of 628 ends

63 Figure 27. Future Development Bikeshed Map - Palomino Business Park !
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !
River
Trails
Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports Complex
Ingalls Park
Doty T
Par
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
91 15

PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE
VALLEY

P K W Y
HIDDEN

HAMNER AVE

FIFTH ST
NORTH
DR

EVA EDISLLIH
FIRST
ST
DR

PARKVIEW

CORYDON
AVE

FOURTH ST

RIVERRD

NORCO DR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY

FUTURE DEVELOPMENT

TRAVEL ACCESS SHED

TRAVEL ACCESS SHED
5-Minute Bike Ride
10-Minute Bike Ride
15-Minute Bike Ride
20-Minute Bike Ride
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
Future Development
Palomino Business Park - Bikeshed
!
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !
River
Trails
Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports Complex
Ingalls Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
15 PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE
VALLEY

P K W Y
HIDDEN

HAMNER AVE

FIFTH ST
NORTH
DR

EVA EDISLLIH
FIRST
ST
DR

PARKVIEW

CORYDON AVE

FOURTH ST

RIVERRD

NORCO DR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY

FUTURE DEVELOPMENT

TRAVEL ACCESS SHED

TRAVEL ACCESS SHED
5-Minute Bike Ride
10-Minute Bike Ride
15-Minute Bike Ride
20-Minute Bike Ride
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
Future Development
Palomino Business Park - Bikeshed

Page 184 of 628 ends

64 Figure 28. Future Development Walkshed Map - Palomino Business Park !
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !
River
Trails
Park
Promenade
Park
Makin/Shearer
Sports Complex
Ingalls Park
Doty Tr
Park
Park
Hidden Valley
Wildlife Area
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
91 15

PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE
VALLEY

P K W Y
HIDDEN

HAMNER AVE

FIFTH ST
NORTH
DR

EVA EDISLLIH
FIRST
ST
DR

PARKVIEW

CORYDON
AVE

FOURTH ST

RIVERRD

NORCO DR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY

FUTURE DEVELOPMENT

TRAVEL ACCESS SHED

TRAVEL ACCESS SHED
5-Minute Walk
10-Minute Walk
15-Minute Walk
20-Minute Walk
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
Future Development
Palomino Business Park - Walkshed
!
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !
River
Trails
Park
Promenade
Park
Makin/Shearer
Sports Complex
Ingalls Park
Park
Hidden Valley
Wildlife Area
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
15 PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE
VALLEY

P K W Y
HIDDEN

HAMNER AVE

FIFTH ST
NORTH
DR

EVA EDISLLIH
FIRST
ST
DR

PARKVIEW

CORYDON AVE

FOURTH ST

RIVERRD

NORCO DR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY

FUTURE DEVELOPMENT

TRAVEL ACCESS SHED

TRAVEL ACCESS SHED
5-Minute Walk
10-Minute Walk
15-Minute Walk
20-Minute Walk
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
Future Development
Palomino Business Park - Walkshed

Page 185 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
65 Norco Valley Square Business Park
Another significant planned development in Norco is Norco Valley Square, which will include residences, food services, a performance stage, and a hotel. Alongside the 320 rental units will also be a recreation center with offices, meeting rooms, and fitness areas. The development will be located on the corner of Third Street and Hamner Avenue, near Norco College and John F.

Kennedy Middle College High School. This project is focused on students at Norco College and their families. The programming of the development is centered around entertainment and commercial activity and will work to make it a key destination within Norco.

As illustrated in Figure 29 and Figure 30, Hamner Avenue and Third Street are the key corridors for walking and biking mobility around this new development. These streets and intersections around Norco Valley Square should be reoriented toward pedestrian and bicycle safety to maximize the potential of this development and its connectivity to the rest of the City.

The Norco Valley Square Business Park is expected to be one of Norco’s most significant planned developments.

Page 186 of 628 ends

66 Figure 29. Future Development Bikeshed Map - Norco Valley Square !
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !
River
Trails
Park
Promenade
Park
Makin/Shearer
Sports Complex
Ingalls Park
Doty Tru
Park
Park
Hidden Valley
Wildlife Area
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
91 15

PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE
VALLEY

P K W Y
HIDDEN

HAMNER AVE

FIFTH ST
NORTH
DR

EVA EDISLLIH
FIRST
ST
DR

PARKVIEW

CORYDON
AVE

FOURTH ST

RIVERRD

NORCO DR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY

FUTURE DEVELOPMENT

TRAVEL ACCESS SHED

TRAVEL ACCESS SHED
5-Minute Bike Ride
10-Minute Bike Ride
15-Minute Bike Ride
20-Minute Bike Ride
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
Future Development
Norco Valley Square - Bikeshed
!
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !
River
Trails
Park
Promenade
Park
Makin/Shearer
Sports Complex
Ingalls Park
Park
Hidden Valley
Wildlife Area
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
15 PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE
VALLEY

P K W Y
HIDDEN

HAMNER AVE

FIFTH ST
NORTH
DR

EVA EDISLLIH
FIRST
ST
DR

PARKVIEW

CORYDON AVE

FOURTH ST

RIVERRD

NORCO DR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY

FUTURE DEVELOPMENT

TRAVEL ACCESS SHED

TRAVEL ACCESS SHED
5-Minute Bike Ride
10-Minute Bike Ride
15-Minute Bike Ride
20-Minute Bike Ride
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
Future Development
Norco Valley Square - Bikeshed

Page 187 of 628 ends

67 Figure 30. Future Development Walkshed Map - Norco Valley Square !
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !
River
Trails
Park
Promenade
Park
Makin/Shearer
Sports Complex
Ingalls Park
Doty Trust
Park
Park
Hidden Valley
Wildlife Area
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
91 15

PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE
VALLEY

P K W Y
HIDDEN

HAMNER AVE

FIFTH ST
NORTH
DR

EVA EDISLLIH
FIRST
ST
DR

PARKVIEW

CORYDON
AVE

FOURTH ST

RIVERRD

NORCO DR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY

FUTURE DEVELOPMENT

TRAVEL ACCESS SHED

TRAVEL ACCESS SHED
5-Minute Walk
10-Minute Walk
15-Minute Walk
20-Minute Walk
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
Future Development
Norco Valley Square - Walkshed
!
! !
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !
River
Trails
Park
Promenade
Park
Makin/Shearer
Sports Complex
Ingalls Park
Park
Hidden Valley
Wildlife Area
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
15 PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE
VALLEY

P K W Y
HIDDEN

HAMNER AVE

FIFTH ST
NORTH
DR

EVA EDISLLIH
FIRST
ST
DR

PARKVIEW

CORYDON AVE

FOURTH ST

RIVERRD

NORCO DR

SIXTH ST

PALOMINO

BUSINESS PARK

NORCO VALLEY
SQUARE

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND
CORONA

EASTVALE

JURUPA VALLEY

FUTURE DEVELOPMENT

TRAVEL ACCESS SHED

TRAVEL ACCESS SHED
5-Minute Walk
10-Minute Walk
15-Minute Walk
20-Minute Walk
0 0.45 0.9 MILES

BASEMAP
! Schools
! Navy Base
! Norco College
! Bus Stop
City Boundary
Future Development
Norco Valley Square - Walkshed

Page 188 of 628 ends

68 Regional Connectivity Analysis
This analysis looks at the major destinations within a 6 mile buffer of Norco city limits. These destinations include parks, transit lines and other jurisdictions that are within an hour bike ride of Norco.

Parks and Natural Features
Most notably within the 6 mile buffer around Norco is the Santa Ana River and the incoming Santa Ana River Trail (SART). When completed, this 110 mile trail will connect Big Bear Lake in the San Bernardino Mountains to the Pacific Ocean in Huntington Beach along the banks of the Santa Ana River. There is currently a significant gap at the Hidden Valley Wildlife Area east of Norco. The long term plan of the trail consists of connecting the trail on the Eastvale side of the Santa Ana River to Norco through a bridge on Hamner Avenue with a soft asphalt surface featuring a multipurpose trail. This trail will attract a significant and widespread user base of both recreational riders as well as commuters.

Norco is also close to the eastern foothills of the Santa Ana Mountains, which are a popular destination for hiking, camping, and other recreational activities. The Hagador Canyon and Skyline Trailhead is just outside of Norco on the south side of Corona.

Prado Regional Park and the Chino Hills State Park are just to the west of Norco. On the east side, Doty Trust Park, the Norco hills and Pumpkin Rock area, and the Santa Ana Regional River Park are in easy biking distance of downtown providing hiking trails and views of the valley.

Rail Transit Centers
There are multiple regional transit connections within the 6 mile buffer of Norco. Enhancing access to these connections will help improve Norco’s connectivity to the surrounding region.

The Metrolink Riverside Line runs just north of Norco and provides access from Downtown Los Angeles to Riverside, connecting through Pomona. This line has stops near Norco in Ontario at the Ontario-East Station and in Jurupa Valley at the Jurupa Valley/ Pedley Station.

The Metrolink Inland Empire-Orange County Line runs south of Norco, connecting San Bernardino to Oceanside, through Riverside, Corona and San Clemente. This line has stops near Norco at the Riverside-La Sierra Station, the Corona-North Main Station and the Corona-West Station. These stations also have transfers to the 91-Perris Valley Line.

The Metrolink 91-Perris Valley Line also runs south of Norco through Corona and Riverside, connecting Downtown Los Angeles to Perris. It has stops at Riverside-La Sierra Station, Corona-North Main Station and Corona-West Station.

In total, the 5 Metrolink stations within 6 miles of Norco provide service to 3 different lines covering the San Bernardino Valley, Orange County and Downtown Los Angeles and have an average weekday ridership of 12,232 riders.

Additionally, just outside of the buffer at the Riverside-Downtown Station, there is access to the Southwest Chief Amtrak line providing national service.

Page 189 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
69 Surrounding Jurisdictions
There are several cities surrounding Norco that can be reached with a short bike ride. Downtown Corona is just south of the City, including the city center with its Grand Boulevard Historic District, which is listed on the National Register of Historic Places. Eastvale is just across the river to the northwest of Norco and Jurupa Valley is to the northeast. The eastern edge of Riverside can be reached across the Norco Hills directly to the east of downtown Norco.

Additionally, each of these surrounding cities has a relatively robust existing or planned bicycle network. As seen in Figure 31, there are many opportunities to connect to these networks, and build upon the surrounding regional infrastructure and improve regional connectivity for people riding bicycles.

Norco’s closest Metrolink stop, Corona-North Main Station, is served by Metrolink’s Inland Empire-Orange County Line and the 91-Perris Valley Line.

The Santa Ana River Trail will eventually extend and connect to Norco at Hamner Avenue.

Page 190 of 628 ends

70 !
! !
!
!
! !
! ! !
Merrill Ave
La Sierra Ave
Arli ngton Ave
Tyler St
Iowa Ave
vation
ne Boy
Airport
Ontario Int'l
Glen Avon
Jurupa Valley
Eastvale
Ontario Colton
Pomona
Corona
Riverside
H i l l s
Peralta
Chino Hills
V a l l e y
Chino
Chino Creek
Santa Ana Mountains
Lake
Matthews
Prado
Regional Park
Lake Matthews
Estelle Mountain
Reserve
Doty Trust
Park
Norco Hills
Santa Ana River Trail
Santa Ana River
Regional Park
Hagador Canyon
FSI8PNSXZNY9WFNQ8YFWY
Santa Ana River
15 15
215
15 10 10
·|}þ91
·|}þ91
·|}þ71
·|}þ241
·|}þ60
·|}þ60
UC Riverside
Norco
0 4 miles 8 miles
Legend
Existing Bike Lane
6 Mile Buffer
Norco City Boundary
Park
Water Body
MetroLink Stop
MetroLink Line
!
Figure 31. Regional Connectivity and Destinations

Page 191 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
71 Pollution Burden Analysis
This analysis layers the Level of Traffic Stress data with CalEnviroScreen and Healthy Places Index data to determine which sections of Norco are disproportionately affected by pollution and high stress roadways. This analysis helps identify areas where projects reducing pollution burden and improving street safety should be prioritized.

CalEnviroScreen
CalEnviroScreen is a mapping tool, created by the California Office of Environmental Health Hazard Assessment, that helps identify California communities that are most affected by many sources of pollution, where people are often especially vulnerable to pollution’s effects. CalEnviroScreen ranks census tracts in California based on potential exposures to pollutants, adverse environmental conditions, socioeconomic factors and the prevalence of certain health conditions. Data used in the CalEnviroScreen model come from national and state sources.

As seen in Figure 32 and Figure 33, most of Norco is not disproportionately affected by pollution burdens. However, there is a higher scored census tract in the center at the intersection of Hamner Avenue and Fourth Street. This is most likely due to the pollution from the interstate and Hamner Avenue, the highly trafficked thoroughfare. Consequently, Fourth Street and Hamner Avenue also account for some of the highest levels of pedestrian traffic stress in Norco, and Hamner Avenue is also one of the highest ranking streets for bicycle traffic stress.

Page 192 of 628 ends

72 Figure 32. Pedestrian Level of Traffic Stress and CalEnviroScreen River
Trails Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Doty Tru
Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
91 15

PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENV ALLEY PKWY

HAMNER AVE

FIFTH ST

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST
CORONA

EASTVALE

JURUPA VALLEY

PEDESTRIAN LEVEL OF

RAFFIC STRESS AND

CALENVIROSCREEN

0.45 0.9 MILES

BASEMAP
City Boundary

CALENVIROSCREEN SCORE

PERCENTILE
0-19
20-39
40-59
60-79
80-100

PEDESTRIAN LTS
1 2
3 4
River
Trails Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
15 PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENV ALLEY PKWY

HAMNER AVE

FIFTH ST

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST
CORONA

EASTVALE

JURUPA VALLEY

PEDESTRIAN LEVEL OF

TRAFFIC STRESS AND

CALENVIROSCREEN
0 0.45 0.9 MILES

BASEMAP
City Boundary

CALENVIROSCREEN SCORE

PERCENTILE
0-19
20-39
40-59
60-79
80-100

PEDESTRIAN LTS
1 2
3 4

Page 193 of 628 ends

73 Figure 33. Bicycle Level of Traffic Stress and CalEnviroScreen River
Trails Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Doty Tru
Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
15 PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENV ALLEY PKWY

HAMNER AVE

FIFTH ST

EVA EDISLLIH
1ST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST

JURUPA VALLEY
CORONA

EASTVALE

BICYCLE LEVEL OF

TRAFFIC STRESS AND

CALENVIROSCREEN
0 0.45 0.9 MILES

BASEMAP
City Boundary

CALENVIROSCREEN SCORE

PERCENTILE
0-19
20-39
40-59
60-79
80-100

BICYCLE LTS
1 2
3 4
River
Trails Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
15 PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENV ALLEY PKWY

HAMNER AVE

FIFTH ST

EVA EDISLLIH
1ST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST

JURUPA VALLEY
CORONA

EASTVALE

BICYCLE LEVEL OF

TRAFFIC STRESS AND

CALENVIROSCREEN
0 0.45 0.9 MILES

BASEMAP
City Boundary

CALENVIROSCREEN SCORE

PERCENTILE
0-19
20-39
40-59
60-79
80-100

BICYCLE LTS
1 2
3 4

Page 194 of 628 ends

74 Healthy Places Index
The Healthy Places Index, developed by the Public Health Alliance of Southern California, is a data layer used to explore the community conditions that impact life expectancy. The HPI helps prioritize public and private investments, resources, and programs in neighborhoods where they are needed most. The HPI combines 25 community characteristics, like access to healthcare, housing, education, and more, into a single indexed HPI score. The healthier a community, the higher the HPI score.

The data trend seen in Figures 34 and 35 is very similar to the CalEnviroScreen data in the previous section. Most of Norco scores very well in the Healthy Places Index. The more affected communties are the ones near Hamner Avenue and the I-15 Freeway. Additionally, this data also revealed a section of Norco in the northeast along California Avenue and Sixth Street that scores lower than the rest of the City on the Healthy Places Index scale and also has two streets, Sixth Street and California Avenue, with relatively high traffic stress.

Page 195 of 628 ends

75 Figure 34. Pedestrian Level of Traffic Stress and Healthy Places Index River
Trails
Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Doty
Pa
Park
Santa Ana
River
Lake
Norconian
Corydon
Staging
Area
91 15

PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENVALLEY PKWY

HAMNER AVE

FIFTH ST

NORTH DR

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST
75 2
65 65
61 26
3 59
67 64
42 34
54 59
42 56
46 73
64 41
61 70
62 41
3 28
28 13
CORONA

JURUPA VALLEY

EASTVALE

PEDESTRIAN LEVEL OF

TRAFFIC STRESS AND

HEALTHY PLACES INDEX

0.45 0.9 MILES

BASEMAP
City Boundary

HEALTHY PLACES INDEX
SCORE
0 to 25 (Less Healthy
Conditions)
26 to 50
51 to 75
76 to 100 (More Healthy
Conditions)
No Data

PEDESTRIAN LTS
1 2
3 4
River
Trails
Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Park
Santa Ana
River
Lake
Norconian
Corydon
Staging
Area
15 PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENVALLEY PKWY

HAMNER AVE

FIFTH ST

NORTH DR

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SIXTH ST
75 65
65 61
26 59
67 64
42 34
54 59
42 56
46 73
64 41
61 70
62 41
28 28
13 CORONA

JURUPA VALLEY

EASTVALE

PEDESTRIAN LEVEL OF

TRAFFIC STRESS AND

HEALTHY PLACES INDEX
0 0.45 0.9 MILES

BASEMAP
City Boundary

HEALTHY PLACES INDEX
SCORE
0 to 25 (Less Healthy
Conditions)
26 to 50
51 to 75
76 to 100 (More Healthy
Conditions)
No Data

PEDESTRIAN LTS
1 2
3 4

Page 196 of 628 ends

76 Figure 35. Bicycle Level of Traffic Stress and Healthy Places Index River
Trails
Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Doty
Pa
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
15 PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENVALLEY PKWY

HAMNER AVE

FIFTH ST

NORTH DR

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SEVENTH ST
75 2
65 65
61 26
3 59
67 64
42 34
54 59
42 56
46 73
64 41
61 70
62 41
28 28
13 CORONA

EASTVALE

JURUPA VALLEY

BICYCLE LEVEL OF

TRAFFIC STRESS AND

HEALTHY PLACES INDEX

HEALTHY PLACES INDEX
SCORE
0 to 25 (Less Healthy
Conditions)
26 to 50
51 to 75
76 to 100 (More Healthy
Conditions)
No Data

0.45 0.9 MILES
ASEMAP
City Boundary

ICYCLE LTS
1 2
3 4
River
Trails
Park
Promenade
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Park
Corydon
Staging
Area
Santa Ana
River
Lake
Norconian
15 PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDENVALLEY PKWY

HAMNER AVE

FIFTH ST

NORTH DR

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVER RD

NORCODR

SEVENTH ST
75 65
65 61
26 59
67 64
42 34
54 59
42 56
46 73
64 41
61 70
62 41
28 28
13 CORONA

EASTVALE

JURUPA VALLEY

BICYCLE LEVEL OF

TRAFFIC STRESS AND

HEALTHY PLACES INDEX

HEALTHY PLACES INDEX
SCORE
0 to 25 (Less Healthy
Conditions)
26 to 50
51 to 75
76 to 100 (More Healthy
Conditions)
No Data
0 0.45 0.9 MILES

BASEMAP
City Boundary

BICYCLE LTS
1 2
3 4

Page 197 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
77 This page intentionally left blank

Page 198 of 628 ends

78 Schools Analysis
Schools in Norco generally form two north-south corridors on either side of the I-15 Freeway (Figure 37). The following analyzes the demographics, existing conditions, and points of potential improvements of each of these schools.

Eastern School Corridor
Figure 36 displays the schools located east of the I-15 Freeway:

1. Riverview Elementary School

2. Town and Country Day School

3. Sierra Vista Elementary School

4. Norco Intermediate School

5. Norco High School

6. Norco Elementary School
Most schools are situated on or near Temescal Avenue, a twolane road that widens to accommodate a center turn lane in school zones. Many schools feature high visibility crosswalks and school crossing signage, though sidewalks in the area tend to be present only within school zones. Intersections near these schools are often small with connections to trails but lack crosswalks. Enhancements like additional sidewalks, upgraded street crossings, signage, bike lanes and markings, and more street lighting would make it safer and more inviting for students walking or bicycling to school. Nearby bike and pedestrian collisions are presented for context, however, the project team cannot determine with complete assurance that the crashes are related to site characteristics or school pick-up and drop-off or functionality.

Figure 36. Eastern School Corridor
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
! !
15 River
Trails
Park
Hidden
Wildlif
Makin/Shearer
Sports Complex
Ingalls Park
Doty Tru
Park
Park
Corydon
Staging
Area

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND

NORCO DR

SECOND ST

FOURTH ST

FIFTH ST

SIXTH ST

FIRST ST PARKRIDGE AVE

RIVER RD

CORYDON AVE

TEMESCAL AVE

HILLSIDE AVE

CALIFORNIA AVE
VALLEY

P K W Y
HIDDEN
Santa Ana
River
Lake
Norconian
CORONA

EASTVALE

JURUPA VALLEY
RIVE

0.5 MILES
1 2 3
4 5
6

Page 199 of 628 ends

79 !
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
91 15
River
Trails
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports Complex
La Sierra
Park
Ingalls Park
Agricultu
Park
Sa
Doty Trust
Park
Park
Corydon
Staging
Area

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND

NORCO DR

SECOND ST

FOURTH ST

FIFTH ST

SIXTH ST

FIRST ST

PARKRIDGE AVE

RIVER RD

CORYDON AVE

TEMESCAL AVE

HILLSIDE AVE

CALIFORNIA AVE

VALLEY P K W Y HIDDEN
Santa Ana
River
Lake
Norconian
CORONA

EASTVALE

JURUPA VALLEY

RIVERSIDE
1 MILE
Figure 37. Norco Schools Map
Legend
School
Pedestrian
Low Traffic
Stress Islands
School
Corridor
!

0.5 Mile
Radius Around
School

Page 200 of 628 ends

80 1. Riverview Elementary School
Riverview Elementary School
GRADES
K-6

SCHOOL TYPE

NEIGHBORHOOD

ENROLLMENT
275
4600 Pedley Ave
Riverview Elementary School is located in a residential area of Norco. It is surrounded by a low density single family neighborhood.

The main entrance of the school is on Pedley Avenue, which features a high visibility crosswalk, a traffic speed feedback sign, and a paved sidewalk. Pedley Avenue has two lanes and the posted speed limit is 25 mph. There have been no accidents in the surrounding half mile radius of the school. There is no lighting along the streets in the vicinity of the schools, potentially making it harder to see bicycles and pedestrians.
!
Improvable Intersection
!
Pedestrian Entrance
Vehicular Entrance
High Visibility Crosswalk
Loading Zone 0.1 MILES

Page 201 of 628 ends

81 Figure 38. Riverview Elementary School Safety Analysis Map 15 California Ave
North Dr
California Ave
Coron
a
Fwy

CEMETERY

EVERGREEN
PA R K

M E M O R I A

CRESTLAWN

P A R K

RIVER TRAILS

S C H O O L

ELEMENTARY

RIVERVIEW
!! ! !

0.5 mile/10 minute walk

0.25 mile/5 minute walk
rIVERVIEW
eLEM sCHOOL
River Trails
Park

CALIFORNIA AVE

TEMESCAL
AVE

CENTER AVE

HILLSIDE AVE

PEDLEY AVE

SEVENTH ST

RIVER DR
Santa Ana
River
JURUPA
VALLEY

RIVERSIDE
Improvable Intersections
Intersections along Seventh
Street lack crosswalks,
sidewalks, and lighting, making
it dangerous for pedestrians
and cyclists.

Improvable
Intersection
This T-intersection only
has a one way stop making
crossing dangerous.

Street Edges
Many streets around
the schools lack
sidewalks and have
poor street edges.

0.25 MILES
Legend
Poor Curb
Pedestrian
Collision
Bicycle
Collision
Improvable
Intersection
Existing Class
II Bike Lane
Existing Class
III Bike Lane

Page 202 of 628 ends

82 2. Town and Country Day School
Town and Country Day School
GRADES
K

SCHOOL TYPE

NEIGHBORHOOD

ENROLLMENT
22 3641 Pedley Ave
Town and Country Day School is located in a residential area of Norco and is surrounded by a low density single family neighborhood. The main entrance of the school is on Pedley Avenue, which has two lanes and a posted speed limit of 25 mph.

There are no sidewalks or crosswalks along the street. From 2017- 2021, there were three crashes total, two pedestrian crashes and a bicyclist crash, within a half mile vicinity of Town and Country Day School. There is also no lighting along most of the streets in the vicinity of the school, potentially making it harder to see bicycles and pedestrians.

Improvable Intersection
!
Pedestrian Entrance
Vehicular Entrance
High Visibility Crosswalk
Loading Zone 0.1 MILES

Page 203 of 628 ends

83 Figure 39. Town and Country Day School Safety Analysis Map 6th St
California Ave
6th St

INGALLS PARK
! !
Ingalls
Park

CALIFORNIA
AVE

FIFTH ST

HILLSIDE AVE

PEDLEY AVE

SIXTH ST

0.5 mile/10 minute walk

0.25 mile/5 minute walk
town and country
day school
Legend
Poor Curb
Pedestrian
Collision
Bicycle
Collision
Improvable
Intersection
Improvable
Intersections
Intersections along Sixth
Street be improved with
enhanced crosswalks.

Street Edges
Many streets around
the schools lack
sidewalks and have
poor street edges that
could be dangerous for
cyclists.

Improvable Intersections
Intersections on Fifth Street
lack crosswalks, sidewalks, and
lighting, making it dangerous
for pedestrians and cyclists.

0.25 MILES

Page 204 of 628 ends

84 3. Sierra Vista Elementary School
Sierra Vista Elementary School
GRADES
K-6

SCHOOL TYPE

NEIGHBORHOOD

ENROLLMENT
404
3560 Corona Ave

0.1 MILES
Sierra Vista Elementary School is located in a residential area of Norco. It is surrounded by a low density single family neighborhood.

The main entrance of the school is on Corona Avenue, which features a standard crosswalk and a paved sidewalk. Corona Avenue has two lanes and the posted speed limit is 25 mph.

There were two crashes involving pedestrians between 2017 and 2021 within a half mile vicinity of Sierra Vista Elementary School.

Multiple accidents on Fifth Street show that there is a need to improve safety for students potentially walking or biking to Sierra Vista Elementary from the west side. There is also no lighting along the streets in the vicinity of the schools, potentially making it harder to see bicycles and pedestrians.

Improvable Intersection
!
Pedestrian Entrance
Vehicular Entrance
High Visibility Crosswalk
Loading Zone

Page 205 of 628 ends

85 15
Hamner Ave
6th St
6 t
h
S
t
I-15 Express Lanes

ER PARK
MUNITY
R K
IPES
SIERRA

VISTA ELEM
SCHOOL
!

HAMNER AVE

SIXTH ST

FIFTH ST

CORONA AVE

TEMESCAL AVE

HILLSIDE AVE

0.5 mile/10 minute walk 0.25 mile/5 minute walk
15 Improvable Intersections
Intersections along Fifth Street
lack crosswalks, sidewalks, and
lighting, making it dangerous
for pedestrians and cyclists.

Street Edges
Many streets around
the schools have poor
street edges that
could be dangerous for
cyclists.

0.25 MILES
Figure 40. Sierra Vista Elementary School Safety Analysis Map Legend
Poor Curb
Pedestrian
Collision
(non fatal)
Pedestrian
Collision
(fatal)
Bicycle
Collision
Improvable
Intersection

Page 206 of 628 ends

86 4. Norco Intermediate School
Norco Intermediate School
GRADES
7-8

SCHOOL TYPE

NEIGHBORHOOD

ENROLLMENT
818
2711 Temescal Ave
Norco Intermediate School is located in a residential area of Norco.

It is surrounded by a low density single family neighborhood.

The main entrance of this school is on Temescal Avenue, which features high visibility crosswalks and a paved sidewalk. Along Temescal Avenue the posted speed limit is 25 mph. The road widens from a two lane road to a three lane road with a center turn lane near the schools. From 2017-2021, there were four crashes total, including pedestrians (3) and a bicyclist (1) within a half mile of Norco Intermediate School. There is also no lighting along the streets in the vicinity of the schools, potentially making it harder to see bicycles and pedestrians.
!!
!
Improvable Intersection
!
Pedestrian Entrance
Vehicular Entrance
High Visibility Crosswalk
Loading Zone 0.1 MILES

Page 207 of 628 ends

87 Figure 41. Norco Intermediate School Safety Analysis Map 15 0.25 mile/5 minute
wal
k

0.5 mile/10 minute walk
15 FOURTH ST HILLSIDE
AVE

TEMESCAL AVE
Norco
iNTERMEDIATE
School

0.25 MILES
Legend
Poor Curb
Pedestrian
Collision
Bicycle
Collision
Improvable
Intersection
Improvable Intersection
This T-intersection does not
have stop signs making it
dangerous to cross. Improvable Intersection
This T-intersection only
has one way stop making
crossing dangerous. It is
also a wide intersection
and could benefit from
a pedestrian island or
median.

Improvable Intersection
This is a large intersection
near the schools and could be
improved crosswalks, lighting
and curb extensions.

Street Edges
Many streets around
the schools have poor
street edges that
could be dangerous for
cyclists.

Page 208 of 628 ends

88 5. Norco High School and 6. Norco Elementary School
Norco High School
GRADES
9-12
GRADES
K-6

SCHOOL TYPE

NEIGHBORHOOD

ENROLLMENT
2,157

ENROLLMENT
532
2065 Temescal Ave 1700 Temescal Ave
Norco Elementary
School
Norco High School and Norco Elementary School are located in a residential area of Norco. They are surrounded by a low density single family neighborhood. The main entrance of each school is on Temescal Avenue, which features high visibility crosswalks and a paved sidewalk. There are also traffic speed feedback signs on Temescal Avenue. Along Temescal Avenue the posted speed limit is 25 mph. The road widens from two to three lanes with a center turn lane near the schools. From 2017-2021, there were two crashes within a half mile of Norco Elementary School, one pedestrian and one bicycle involved. There is also no lighting along the streets in the vicinity of the schools, potentially making it harder to see bicycles and pedestrians.
!
!
!
!
Norco
Elementary
School
Norco High
School
Improvable Intersection
!
Pedestrian Entrance
Vehicular Entrance
High Visibility Crosswalk
Loading Zone 0.1 MILES

Page 209 of 628 ends

89 Figure 42. Norco High School and Norco Elementary School Safety Analysis Map 15 15
15 2nd St
Hamner Ave
1st St
Hamner Ave
Mountain Ave
Hidden Valley Pkwy
Corona Fwy
I-15 Express Lanes

C E N T E R

T O W N

GATEWAY

P L A Z A

VA L L E Y
HIDDEN

P A R K

PARKVIEW

C A M P U S

N O R C O

COLLEGE -

C O M M U N I TY

RIVERSIDE

INTERMEDIATE
NORCO

0.5 mile/10 minute walk

0.25 mile/5 minute walk

0.5 mile/10 minute walk

0.25 mile/5 minute walk
15 T
E
M
E

SCAL AVE

SECOND ST

HAMNER AVE

CORONA AVE

FIRST ST

HILLSIDE
AVE
CORONA
Norco High
School
Norco
Elem
School

HIDDEN VALLEY PKWY
Legend
Poor Curb
Pedestrian
Collision
Bicycle
Collision
Improvable
Intersection
Existing Class
II Bike Lane

0.25 MILES
Improvable Intersection
This T-intersection only
has a one-way stop making
crossing dangerous.

Street Edges
Many streets around
the schools have poor
street edges that
could be dangerous for
cyclists.

Improvable
Intersection
This intersection is
a large intersection
near the schools and
could be improved with
crosswalks, lighting and
curb extensions.

Improvable Intersection
This T-intersection only has
one way stop making crossing
less safe. Poor site lines also
make walking and biking more
dangerous.

Page 210 of 628 ends

90 Western School Corridor
Figure 44 displays the schools located to the west of the I-15 Freeway, including:

1. Highland Elementary School

2. Turning Point Christian School

3. John F. Kennedy Middle College High School

4. Norco College
Schools in the area are generally located along larger
thoroughfares, such as Norco Drive. Many of these schools are also clustered within a half mile of one another. Large institutional properties, such as the Naval Surface Warfare Center, and several dead-end streets in the area, such as Third Street and Western Avenue, inhibit street connectivity. Additionally, while some streets in the area feature sidewalks and bike lanes, high-speed automotive traffic may discourage students from walking or biking to school. Suggested improvements, such as curb extensions, upgraded street crossings and bike lanes, and traffic calming elements like speed feedback signs, could be implemented along wider streets like Norco Drive, while additional sidewalks and street lighting would enhance smaller streets in the area.

Figure 43. Western School Corridor
!
!
!
!
!
!
!
!
! !
!
!
!
!
15 River
Trails
Park
Makin/Shearer
Sports Complex
Park
Corydon
Staging
Area

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND

NORCO DR

SECOND ST

FOURTH ST

FIFTH ST

SIXTH ST

FIRST ST PARKRIDGE AVE

RIVER RD

CORYDON AVE

TEMESCAL AVE
VALLEY

P K W Y
HIDDEN
Santa Ana
River
Lake
Norconian
CORONA

EASTVALE
1 2
4 3

0.5 MILES

Page 211 of 628 ends

91 !
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
91 15
River
Trails
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports Complex
La Sierra
Park
Ingalls Park
Agricultu
Park
Sa
Doty Trust
Park
Park
Corydon
Staging
Area

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND

NORCO DR

SECOND ST

FOURTH ST

FIFTH ST

SIXTH ST

FIRST ST

PARKRIDGE AVE

RIVER RD

CORYDON AVE

TEMESCAL AVE

HILLSIDE AVE

CALIFORNIA AVE

VALLEY P K W Y HIDDEN
Santa Ana
River
Lake
Norconian
CORONA

EASTVALE

JURUPA VALLEY

RIVERSIDE
1 MILE
Legend
School
Pedestrian
Low Traffic
Stress Islands
School
Corridor
!
Figure 44. Norco Schools Map

Page 212 of 628 ends

92 1. Highland Elementary School and 2. Turning Point Christian School Highland
Elementary School
GRADES
K-6

SCHOOL TYPE

NEIGHBORHOOD

ENROLLMENT
590
2301 Alhambra St 2000 Norco Dr
Turning Point
Christian School
Highland Elementary School and Turning Point Christian School are located in a residential area of Norco. They are surrounded by a low density single family neighborhood. The main entrance of Highland Elementary School is on Alhambra Street, a two-lane road with a standard crosswalk, a paved sidewalk, and a posted speed limit of 25 mph. The main entrance of Turning Point Christian School is on Norco Drive, which features a standard crosswalk, paved sidewalks, and bike lanes. Norco Drive has a posted speed limit of 35 mph. Both streets only have lighting at the crosswalks, potentially making it harder to see bicycles and pedestrians elsewhere along the streets. There have been no accidents in the last 5 years within 0.5 miles of the schools.

Turning Point
Christian
School
Highland
Elementary
School
Improvable
Intersection
!
Pedestrian
Entrance
Vehicular
Entrance
High Visibility
Crosswalk
Loading
Zone
GRADES
K-8

ENROLLMENT
128

0.1 MILES

Page 213 of 628 ends

93 Figure 45. Highland Elementary School and Turning Point Christian School Safety Analysis Map 15 15
Norco
Dr
Norco Dr
H
a
mner Ave
6th St
I-15
Express
Lanes
I-15 Express Lanes
PA R K

RIVER WALK

CENTER PARK

COMMUNITY

P A R K

NEIL SNIPES

S C H O O L

ELEMENTARY
Highland HIGHLAND
Elem School
Turning Point
Christian
School
15 River
Trails Park
HAM
N
ER
AVE

SIXTH ST

NORCO DR

FIFTH ST
Santa Ana EASTVALE River

0.5 mile/10 minute walk

0.25 mile/5 minute walk

0.5 mile/10 minute walk

0.25 mile/5 minute walk
Improvable Intersection
This is a large and busy
interesection that could
be improved with high
visibility crosswalks and curb
extensions.

Improvable Intersections
Many intersections near the
schools lack crosswalks,
sidewalks, and lighting, making
it dangerous for pedestrians
and cyclists, especially at night.

0.25 MILES
Legend
Poor Curb
Improvable
Intersection
Existing Class
III Bike Lane
Pedestrian
Collision
(non fatal)
Pedestrian
Collision
(fatal)
Bicycle
Collision
Existing Class
II Bike Lane

Page 214 of 628 ends

94 GRADES
N/A

SCHOOL TYPE
URBAN

ENROLLMENT
8,846

3. John F. Kennedy Middle College High School and 4. Norco College Norco College
2001 Third St
Norco College and John F. Kennedy Middle College High School are located between a residential area and the primary commercial arterial of Norco. They are surrounded by a low density single family neighborhood to the west, open space, and large, big-box commercial and institutional properties to the east and south. The main entrance of each school is on Third Street, which features high visibility crosswalks with flashing light beacons, street lighting, and paved sidewalks. Along Third Street the posted speed limit is 35 mph. The road widens from four lanes to six near the schools. From 2017-2021, there were two crashes involving a pedestrian within a half mile of the schools.
!
John F.

Kennedy
Middle College
High School
Norco College
GRADES
9-12

ENROLLMENT
620
1951 Third St
JFK Middle College
High School
Improvable
Intersection
!
Pedestrian
Entrance
Vehicular
Entrance
High Visibility
Crosswalk
Loading
Zone 0.1 MILES

Page 215 of 628 ends

95 Figure 46. Norco College and John F. Kennedy Middle College High School Safety Analysis Map 15 15
2nd St
2nd St
H
amner A
v
e
C
orona
F
w
y

C O R O N A

WARFARE CTR

S U R FA C E
NAVAL

N T E R
PPING

C A M P U S

N O R C O

COLLEGE -

C O M M U N I T Y

RIVERSIDE
! Norco
JFK Middle
College High
School
Norco
College

0.5 mile/10 minute walk

0.25 mile/5 minute walk

0.5 mile/10 minute walk

0.25 mile/5 minute walk
15 NAVAL SEA

SYSTEMS

COMMAND

FOURTH ST

HAMNER AVE

SECOND ST
Lake
Norconian
Improvable
Intersections
Many intersections near
the schools are large and
could be improved with high
visibility crosswalks and
curb extensions.

Street Edges
Some streets near the schools
lack sidewalks and have have
undefined edges which could
be dangerous for cyclists.

0.25 MILES
Legend
Poor Curb
Pedestrian
Collision
(non fatal)
Pedestrian
Collision
(fatal)
Bicycle
Collision
Improvable
Intersection

Page 216 of 628 ends

96 03 Community Engagement

Page 217 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
97 Community Engagement
Throughout the planning process in drafting the Pedestrian and Bicycle Master Plan, community engagement has been a key element to understanding how Norco’s current transportation network functions and where it can be improved. The planning team developed an approachable, participatory process with residents and stakeholder groups that clearly demonstrated how the community’s input is to be utilized.

Strategies
The project team utilized three main strategies to solicit feedback from the Norco community members:
• Community Needs Survey
• Interactive Public Input Map
• Community Outreach
Community Needs survey
The project team created a survey in English and Spanish to engage the community in the planning and design process and to solicit input and feedback about their needs, priorities, and opportunities. Questions focused on active transportation attitudes and perceptions in Norco, existing and desired bicycle and pedestrian access, and satisfaction levels with current infrastructure. The survey gave special attention to equestrianpedestrian and equestrian-cyclist considerations. The survey collected 227 responses, providing guidance to the project team.

All of the survey respondents listed Norco ZIP codes, 92860 or 92505, as their residential ZIP code.

The survey questions included:

1. What language would you prefer?

2. How do you typically get around Norco?

3. How often do you walk, bike, or take transit to move around Norco?

4. If you choose to walk or bike, why do you choose to do so? Select all that apply.

5. What barriers prevent you from walking or biking? Select all that apply.

6. What would make walking or biking more convenient and comfortable?

7. What are your favorite destinations to walk or bike in Norco?

8. Where would you like to walk or bike in Norco that you currently cannot?

9. How do you think the City of Norco can improve walking and cycling conditions? How should different roadways uses
(equestrian, walking, biking, driving) be separated, if at all?

10. While equestrian connectivity is always a priority, what is your vision for the future of walking and biking in Norco?

11. What is your ZIP code?

Page 218 of 628 ends

98 Popular Destinations in Norco

PIKES PEAK PARK

PUMPKIN ROCK
6TH STREET
George Ingalls Equestrian Center
STATER bROS MARKET
Shopping at river rd

HIDDEN VALLEY

WILDERNESS
sANTA ANA RIVER

COUNTRY
DONUTS
dEEP BARREL COFFEE

NORCO COMMUNITY
CENTER
sILVERlAKES pARK

POKE TOWN
sCHOOLS
146
20 6 3 0 0 0 3
0%
25%
50%
75%
100%
How do you typically get around Norco?
Responses
59 45
18 57
Daily Weekly Monthly Never
0%
5%
10%
15%
20%
25%
30%
35%
How often do you walk, bike, or take transit to move
around Norco?
Responses
Figure 47. How Do You Typically Get Around Norco Responses Figure 49. Most Popular Destination Responses Figure 48. How Often Do You Walk, Bike or Take Transit Responses 69 respondents (39%) stated the lack of sidewalks and bike lanes as the main barrier to no walking and cycling more. In addition, 73 respondents (42%) stated that they do not feel safe enough on the streets to walk and bike. This is compared to the 38 respondents (21%) that staed the convenience of the car is the main barrier to walking and biking. These responses show that there is a desire within the City to improve walking and cycling conditions and safety.

Page 219 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
99 Interactive Public Input Map
The project team also developed a custom, interactive online map alongside the survey. The map helps the community to provide specific, geo-located feedback about particular areas in Norco that they do not feel safe walking or riding a bicycle, or would like to access via active transportation. The public input map features existing and proposed infrastructure and enables stakeholders to draw in proposed facilities and connections, vote on other proposals, and submit general comments and feedback.

The 20 comments from the public input map identified multiple areas and routes around Norco that feel unsafe and are inhibitors to walking and biking. Many of the comments revolved around parks and schools.
• Hidden Valley Wildlife Preserve - This area is a key regional destination for walkers and cyclists, and continuing the existing bike lane and sidewalks into Norco would help
improve access and make the trip to the Preserve more
comfortable. Four of the comments called out California Avenue and North Drive as being particularly dangerous and limiting access to the Preserve.
• Sixth Street - Sixth Street is Norco’s main street with many popular local businesses and destinations. Three comments called out the need for a bike lane on Sixth Street, the Sixth Street Bridge as being dangerous for kids, and difficulties accessing crosswalk buttons.
• Temescal Avenue - Three comments called out Temescal
Avenue for needing improvements to enhance safety and
accessibility due to the presence of many of Norco’s schools.

Improving crossings and completing the sidewalk network can help improve conditions. Comments also specifically requested traffic calming to prevent drivers from running stop signs and slow vehicle speeds in school zones.
• Second Street - One comment suggested a bike lane along Second Street, connecting from the existing lanes on River Road and Corydon Avenue to the shopping centers on
Hamner Avenue. This would help connect the residential
areas to the commercial areas, providing safe and convenient

Page 220 of 628 ends

transportation options besides driving.
100
Walking and Cycling as Recreation
Many residents expressed a love of walking and biking as exercise (127 respondents) and for recreation (103 respondents).

This was also evident as many of Norco’s parks and natural features were among the top destinations listed within the City.

Improving access to parks, hiking trails, and natural features, including Pumpkin Rock, the Hidden Valley Wilderness Preserve and the Santa Ana River, within Norco and the surrounding area, would greatly improve the user experience in Norco.
“We put our e-bikes in our truck and drive from our home (near Ingall’s Park) over to the park across from Silver Lakes in Eastvale to ride. We then use the bike path in that park and ride around Eastvale to get more miles. We don’t feel safe riding from home over there and don’t really know of any parks with dedicated paved bike trails in Norco. Would like a 10 mile or so scenic dedicated paved bike path in Norco” - Survey Respondent Road Safety
Another common theme in the surveys was concerns about
driver speed and the unsafe roadway conditions caused by reckless driving. Some residents (73 respondents) cited this as a major inhibitor to walking and biking. More police patrols as well as road design changes can help force slower, safer driving. [When asked where they walk or bike] - “Nowhere. Cars are going way too fast. - Survey Respondent
“I would love to be able to have sidewalks that provide a safe way to walk to all of the parks in our neighborhoods with my family. Or to go on a simple walk around the block after dinner. I do not feel safe taking a family walk without sidewalks.”- Survey Respondent Road Barriers
Some residents talked about the barriers many of the arterial streets pose for walking and biking. 70 respondents (39%) said that if drivers were more careful walking and biking would be more comfortable. This is consistent with our LTS analysis, showing low stress areas surrounded by high stress and
dangerous streets. Working on these crossings will greatly improve the walking, biking, and riding experience in Norco. “I ride several times a week. Depending where you live, major traffic arteries are a major barriers and present significant safety issues to ride in line with traffic.” - Survey Respondent Separate Cars, Bikes, Horses, and Pedestrians
Norco residents are extremely proud of their equestrian focused way of life in Norco and prioritize maintaining and improving horse trails. Many responses complained about cyclists spooking horses along bridal paths and bridal paths being uncomfortable or impossible to walk on, especially for those living with disabilities. By separating modes, safety and comfort can be improved for all modes of travel.
“Horse trail on one side of street, and sidewalk on other side (where permissible). It’s dangerous for kids walking/biking to/from school.” - Survey Respondent
“I feel there should be pedestrian sidewalks and bike lanes on all sides of the street opposite of the horse trail; so that horses can remain safe on their side but also give pedestrians and bikers safety to travel too.” - Survey Respondent

Page 221 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
101
Focus on School Corridors
Many of the schools in Norco are located on or near Temescal Avenue. Additionally, the east and west sides of Norco both have a school corridor with schools located close to each other. Many survey respondents noted that they would like to be able to walk or bike to school with their kids but currently do not feel safe doing so.
“We would love to simply walk and bike our neighborhood but since there aren’t any sidewalks it feels unsafe most of the time.

We would also like to walk and bike to school ( Town & Country and Riverview) and to the shops on sixth street..” - Survey Respondent
“The parks, around our neighborhood. Would love to walk to my children’s elementary, but without sidewalks it is dirty and in this weather muddy, and the narrow streets are unsafe with speeding cars.” - Survey Respondent
Public Input Map Summary
Overall, there is a general desire to improve safety and facilities around Norco, as long as the equestrian lifestyle and infrastructure is maintained. There are concerns about safety and accessibility that prohibit some residents from walking and biking, as well as residents who currently walk or bike despite unsafe conditions. Designing creative ways and streetscapes that improve safety and functionality for all road users will greatly improve Norco and the lives of its residents.
“Walking and biking in Norco should be supported for community members to thrive and maintain healthy lifestyles. I have a vision that Norco will someday have a horse, bike, and pedestrian path that provides access to the San Bernardino Mountains, the Cleveland National Forest, and Huntington Beach!.” - Survey Respondent

Page 222 of 628 ends

102
Figure 50. Norco Public Input Map

Page 223 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
103

COMMUNITY OUTREACH
In order to engage with Norco residents, the project team drafted a plan to attend a series of events and community meetings to have meaningful conversations, solicit
recommendations, and receive feedback on proposals.

Events
• Norco Little League Opening Day - Two members of the
planning team attended Norco Little League Opening Day to talk to Norco residents about the Plan. Many of the comments from community members expressed a desire for the horse trails to remain as is or be improved and expanded upon.

Residents also were concerned about safety around schools and improving access to parks and recreation areas.
• Streets, Trails, and Utilities Commission (STUC) Meeting - As part of the ongoing collection of feedback from the City of Norco and residents, the Plan’s development process and draft recommendations were presented at a STUC committee for review and input. The committee’s direction and response informed subsequent recommendation refinements for
the final plan. The committee emphasized the maintenance and protection of equestrian infrastructure and culture that has been built in Norco. The committee also stated that recommendations should not impede or prohibit equestrian accessibility and should expand upon existing infrastructure.

The committee advised limiting the amount of lane closures and physical elements within vehicle path of travel. The plan team utilized existing right of way and extra space to fit in recommendations and traffic calming.

Page 224 of 628 ends

104
04 Recommendations

Page 225 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
105
Recommendations
Developing recommendations is a multi-step process that requires an in-depth understanding of a community’s identity, existing conditions including data analytics, project feasibility, and community feedback. This chapter utilizes the research of the Existing Conditions chapter, the conclusions drawn from the data analytics portion in the Needs Analysis chapter, and the extensive community feedback acquired from the public survey and input map to create a set of recommendations that will provide a safe and convenient network of bicycle and pedestrian infrastructure in harmony with equestrian facilities and needs.

Existing Conditions Conclusions
The main takeaways from the Existing Conditions chapter used to inform recommendations include:
• Strong presence of trail infrastructure and network
• Construction of Santa Ana River Trail, providing bike regional connectivity
• Eastern and western school corridors
• Collision density and distribution
Strategy Recommendation
Strategy 1: Make It
Accessible
Norco has a limited existing network
of sidewalks and bicycle lanes, most
of which are Class II or Class III. Survey
respondents stated they would feel
more comfortable riding on routes with
physical protection.

Create a Backbone Network
Create a core network of protected
bikeways around the City connecting to
key areas. This core network will provide
the foundation for future expansion of
the bicycle and pedestrian network.

Strategy 2: Make Horses,
Cars, Pedestrians and
Cyclists Work Together
Trails are a key part of Norco’s city
identity and should be improved and
expanded upon. However, in order for
them to be more user friendly, the street
infrastructure also has to provide space
for pedestrians and cyclists.

Create Separation
To maximize the safety and convenience
of each mode of active transportation,
create dedicated lanes and trails
on separate sides of the street for
pedestrians, cyclists, and horses. By
creating separate facilities for each user
when feasible, cyclists will feel safer
from cars and equestrians will feel safer
from cyclists and pedestrians who may
spook the horses.

Strategy 3: Focus On Schools
Survey respondents have expressed
a desire for safer walking and biking
connections in and around schools.

Create School Corridors
A slate of recommended safety
improvements are concentrated along
or near two school corridors on either
side of I-15. These will complement
improvements elsewhere in Norco.

Strategy 4: Focus on
Intersections
Unprotected and wide intersections
can leave pedestrians and bicyclists
vulnerable to motor vehicles.

Create Spot Improvements
Spot improvements are based on
intersection typologies and include
elements like high visibility crosswalks,
stop signs, and curb extensions.

Table 3. Bicycle and Pedestrian Network Strategies

Page 226 of 628 ends

106
Needs Analysis Conclusions
The main takeaways from the Needs Analysis chapter used to inform the recommendations include:
• Level of Traffic Stress
• Gaps in Low Stress Networks
• Latent Demand Analysis
• Walk and Bike Shed
• Regional Connectivity
Public Survey Conclusions
The public survey and input map gave insight to the issues and areas that most concern the residents of Norco, and allowed for more specific need based recommendations based on the suggestions of the community. A total of 227 survey responses and 32 public input map comments were collected. 73%
of respondents reported ZIP code, and 100% said they are residents.

Some of the major insights drawn from the survey and public input map include:
• 35% of respondents walk, bike or take transit daily, and 28% weekly
• Main reasons for walking and biking are for health, enjoyment, and time with family
• 51% said drivers being careful would make walking and biking more comfortable, 40% said that separated bike lanes and dedicated sidewalks would improve conditions
• Trails can be hard to walk and bike on due to their conditions • One of the biggest issues is driver responsibility and car safety • Parks, Deep Barrel Roasters and Creamery, restaurants on Sixth Street, and Pumpkin Rock were the most popular destinations for people walk and bike
Individual open-ended comments were received about the
following concerns:
• Focus on designated bicycle routes and major crossings • Keep equestrians, cyclists, and pedestrians separate, potentially on different sides of the street
• Most of the use is recreation driven, so focus on relevant areas and routes
• An overall need for safer paths for children walking to school • Unsafe crossings and difficulties accessing some pedestrian push buttons along the major commercial corridor of Sixth Street
• A desire for expanded equestrian and walking trails near their homes
• The entirety of Fourth Street is in need of safe pedestrian walkways and crossings
• Pedestrian paths for the existing backyard trail network near Corydon Avenue

Page 227 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
107
Different types of bicycle and pedestrian facilities are better suited for different roadways, based on considerations such as vehicle speeds and volumes, the roadway width, and other types of transportation using the space. The following facilities should be included in the City’s toolbox. Some facilities promote both bicycle and pedestrian use. These facilities will need further study to ensure they do not conflict with local standards.

This toolkit was applied to the streets in Norco, and
recommendations were made using the appropriate facilities from this toolkit.

The City can refer to the following documents for additional details on these facilities:
• Caltrans HDM
• Manual on Uniform Traffic Control Devices (MUTCD)
• National Association of City Transportation Officials (NACTO) Guides
• Federal Highway Administration Bikeway Selection Guide Bicycle Lanes
Bikeway recommendations were applied to connectivityfocused corridors within Norco as well as connecting to outside jurisdiction’s planned or existing networks, with appropriate applications of bikeway to roadway type. In addition to new recommended facilities, upgrades to existing facilities were recommended after consideration of community feedback and existing plan and policies.

Bicycle lanes are an important aspect of lowering the levels of traffic stress (LTS) on the roadway. However, other roadway factors like vehicle speeds and volumes also contribute to the level of traffic stress. More information about LTS can be found in the Needs Analysis chapter.

Bicycle and Pedestrian Toolkit

Page 228 of 628 ends

108
Bike Path (Class I): provide a completely separate
right of way for the exclusive use by bicyclists
and pedestrians with cross-flow minimized.

The Caltrans HDM requires a minimum paved
width of 8 feet for a two-way bike path, with 10
preferred, and a minimum paved width of 5 feet
for a one-way bike path, with a minimum 2-footwide shoulder. Where heavier bicycle volumes are anticipated and/or significant pedestrian traffic
is expected, the Caltrans HDM calls for the paved
width of a two-way bike path to be greater than
10 feet, preferably 12 feet or more. Class I paths
generally have a low level of traffic stress and are
suitable for most bicyclists.

Bike Lanes (Class II): provide a striped
lane for one-way bike travel on a street
or highway. The Caltrans HDM requires a
minimum width of 8 feet measured from
the curb face or 4 feet measured from the
edge of pavement if there is no curb and
gutter. Depending on the vehicle volumes
and speed of the roadway, bicycle lanes
can vary in their level of traffic stress.

Buffered Bicycle Lane (Class IIb):

Caltrans HDM also recognizes
buffered bicycle lanes, which
include a striped buffer usually 2 to
3 feet wide to help further separate
the bicycle lane from vehicular
traffic. Depending on the vehicle
volumes and speed of the roadway,
buffered bicycle lanes can vary in
their level of traffic stress.

Page 229 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
109
Bike Routes (Class III): signed, shared
roadways that provide for shared-use
with pedestrians or motor vehicle
traffic, typically on lower volume
roadways per Caltrans HDM (Chapter
1000). A bicycle route has signs
posted identifying it as such and may
have shared lane markings (sharrows).

Bike routes on low speed and low
volume roadways can have a low level
of traffic stress.

Bicycle Boulevard (Class IIIb):
similar to bicycle routes, but also
include traffic calming facilities
such as chicanes or diverters, and
often include branded signage
along the length of the facility.

Bike boulevards on low speed and
low volume roadways can have a
low level of traffic stress.

Separated Bikeways/ Cycle Tracks (Class IV): Class
IV separated bikeways are on-street bicycle facilities
that are physically separated from motor vehicle
traffic by a vertical element or barrier, such as a curb, bollards, or vehicle parking aisle. They can allow for
one- or two-way travel on one or both sides of the
roadway.

Page 230 of 628 ends

110
Bicycle Facilities
Bicycle facilities are an important part of improving the user experience and encouraging people to cycle. Facilities can include bicycle parking, signalization specific to bikes, wayfinding signage, and protected intersections. These facilities work to make a more comfortable experience for the users by improving convenience and safety.

Page 231 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
111
Bike Parking: can include curbside
and sidewalk racks, bike corrals,
bike lockers and bike station. Racks
provide short-term parking options,
while lockers provide long-term
secure parking at higher demand
locations. Bike stations provide longterm parking typically near transit.

Bike Signals: create separation
between bicyclists and vehicles
and allows for safer intersection
movements for all users.

Wayfinding: signage can
contribute to the ease of
use and enjoyment of active
transportation facilities and
promotes walking and bicycling
by providing useful information
regarding distances/times to
various destinations.

Bicycle Protected Intersections:
are designed to provide additional
separation, comfort, and safety for
bicyclists. These intersection may
include bike boxes, bike signals, curb
extensions, refuge islands, and green
bike lanes. These intersections are
ideal for areas with conflicts between
drivers, bicyclists, and pedestrians.

Page 232 of 628 ends

112
Bike Detection and Signal
Actualization: Bike detection is
used at actuated signals to alert the
system of the presence of a cyclist.

The systems need to be calibrated to
detect the mass of a bike, rather than
a car.

Vertical Deflection: Speed
bumps and tables create vertical
deflection slowing traffic in
desired areas. These are used
to create a slower street that is
more accomodating to cyclists,
pedestrians, and horses. They can
be used to create a network of
Slow Streets.

Horizontal Deflection: Chicanes,
roundabouts, curb extensions,
neckdowns and other strategies
are used to create horizontal
deflection of traffic to slow cars.

Similar to vertical deflection
devices, they can be used to
create a network of Slow Streets
in a desired area.

Page 233 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
113
Pedestrian elements help create a safer walking environment along streets that may have a high Level of Traffic Stress. The appropriate pedestrian improvement was applied to each street based on its characteristics and classification. Recommended pedestrian improvements were determined through a diverse set of criteria, including collisions, Level of Traffic Stress, composite demand, network gaps, and public comment, amongst other possible criteria. The following pages illustrate such pedestrian facilities.

Many of the pedestrian recommendations are also beneficial and could be applied to equestrian facilities, creating a more horsefriendly streetscape around the City.

Pedestrian Toolkit

Page 234 of 628 ends

114
Pedestrian Refuge Islands: allow
pedestrians to stop before finishing
crossing a road.

Enhanced Pavement Markings
and Signage: help establish
pedestrians in the intersection.

High Visibility Crosswalks:
feature special roadway striping
that enhances visibility.

Pedestrian-scale Lighting: is
designed to specifically illuminate
sidewalks and pedestrian pathways.

Signal Timing Improvements: prioritize
pedestrian safety typically by increasing
cycle lengths and wait times for
pedestrians.

Curb Ramps: are accessible
ramps to transition pedestrians
from the road to the sidewalk.

Page 235 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
115
Pedestrian Hybrid Beacon (e.g.

HAWK): when activated by a
pedestrian, lights overhead turn red
indicating that drivers must stop for
the pedestrian to cross.

Curb Extensions: are extensions
of the sidewalk area that can
reduce crossing distances.

Sidewalk Improvements: provide
a safe separate space from
vehicles and allow people of
all ages and abilities to walk to
destinations.

Slip lane Modifications/Corner
Radius Reductions: slows turning
vehicles and shortens pedestrian
crossing distances.

Traffic Calming/Chicanes: features
that reduce vehicle speeds. This
image shows chicanes which narrow
the roadway to slow vehicle speeds.

Rapid Rectangular Flashing
Beacon (RRFB): when activated
by a pedestrian, lights overhead
flash alerting drivers that a person
is using the crosswalk.

Page 236 of 628 ends

116
Typical Streets Potential Changes
6’
6’ 6’
8’ 6’
8’
8’ 8’
6’ 4’ 4’ 6’
4’ 4’
4’ 8’4’
8’10’
10’
10’ 12’ 11’ 10’
12’ 12’ 10’11’ 12’11’ 12’
11’ 11’ 11’
10’ 10’ 10’
12’
64’
88’
12’
10’
36’
60’
80’
64’
100’
100’
6’ 5’ 3’ 11’ 11’ 11’ 11’ 8’4’ 6’
64’
88’
12’
12’ 14’ 6’ 12’12’ 14’12’ 6’ 12’
64’
100’

Page 237 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
117
This page intentionally left blank

Page 238 of 628 ends

118
Bicycle Recommendations
The bicycle recommendations for Norco are focused on cyclist safety and connectivity. Rather than blanketing the City in bike lanes, a more targeted and specific approach was taken: create a loop of connected bicycle infrastructure in each of the four major quadrants of Norco and connect them to each other. These loops work to connect riders to major destinations in and around the City, including public transportation stops, parks, schools, commercial districts and the Santa Ana River Trail. Additionally, these recommendations also work to extend bike lanes and infrastructure from surrounding jurisdictions into Norco to create a regional network.

Bicycle recommendations range from wayfinding signage,
traffic calming and bicycle boulevards, bike lanes, and improving existing lanes with barriers.

Pedestrian Recommendations
Pedestrian recommendations work to make streets and
intersections safer for pedestrians, who have a very different traveling experience from bicyclists. Wide intersections, fasttraveling motor vehicles, missing sidewalks and trails, and unlit streets can greatly hamper the walking experience. The Plan’s pedestrian recommendations section focuses on improving this experience through two categories of safety enhancements:
spot improvements and corridor improvements.

Pedestrian Spot Improvements
Spot improvements, typically located at intersections, include one or more pedestrian safety enhancements that fall under the following categories:
• Crossing Improvement
• School Zone Improvement
• Signal Improvement
This Plan includes 55 pedestrian spot improvements that would create safer conditions for pedestrians at intersections and along streets. Tools that fall under spot improvements include:
• Curb extensions
• Crosswalks and curb ramps
• High intensity activated crosswalk (HAWK) beacons
• Leading pedestrian intervals (LPI)
• Pedestrian refuge islands
• Rectangular rapid flashing beacons (RRFB)
• Traffic signs and controls
Pedestrian Corridor Improvements
Pedestrian accessibility throughout a community is supported by a well-connected pedestrian network that provides
sufficient space for pedestrians alongside roadways. In Norco, pedestrians can make use of the City’s extensive trail network to reach nearby destinations like homes, schools, parks, and retail centers. However, there are a few areas in the City where sidewalks already exist, but lack full connectivity due to gaps in the network. This is particularly prevalent in the neighborhoods to the west of the I-15 Freeway. Additionally, sidewalks are Recommendations Summary

Page 239 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
119
present near many Norco schools, but end abruptly outside of the school zone, forcing pedestrians into streets and unpaved shoulders.

Pedestrian improvement tools under the Plan’s pedestrian corridor improvements include elements such as new or
extended sidewalks, new multi-use paths, and street lighting.

Page 240 of 628 ends

120
Figure 51. Citywide Bicycle and Pedestrian Recommendations

AIRPORT

MUNICIPAL
CORONA
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
! !
!
!
!
!
!
! ! !
!
! ! !
! ! !
! ! !
! ! !
! !
!
!
!
!
!
!
! ! !
!
!
!
!
!
! !
!
!
! ! ! !
!
!
!
!
! !
!
!
91 15
River
Trails
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports Complex
Ingalls Park
Corydon
Staging
Area

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND

PARKRIDGE AVE

SECOND ST

EVA AINROFILAC

TEMESCAL AVE

HIDDEN VALLEY PKWY

EVA RENMAH

FIFTH ST EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVERRD

NORCO DR

SIXTH ST

EIGHTH ST

SEVENTH ST

RIVER DR

NORTH DR

CORONA AVE

PEDLEY AVE

THIRD ST

BELGIAN DR

DALES DR
BROKEN

LANCE DR NORCONIAN DR

FIFTH ST

FIRST ST

SECOND ST

EL PASO DR HAMNER AVE TEMESCAL AVE

WESTERN AVE
Santa
Ana River
Lake
Norconian
CORONA

EASTVALE

JURUPA VALLEY
NORCO
Schools
Norco College
Navy Base
Parks
Water Bodies
Norco Boundaries

CITY OF NORCO

EXISTING BIKEWAYS
Class 1 Bike Lane
Class 3 Bike Route
Class 2 Bike Lane

BASEMAP

PEDESTRIAN

RECOMMENDATIONS
Spot
Improvements
Multi-use Path
Sidewalk
Street Lighting
!

BICYCLE

RECOMMENDATIONS
Class 1
Class 2
Class 2b
Class 3b
0 0.5 1 MILES

BIKE AND PEDESTRIAN

RECOMMENDATIONS

Page 241 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
121
Bicycle Recommendations
In order to outline the recommendations, the project team divided the City into four quadrants, based on the Level of Traffic Stress (LTS) analyses. Level of Traffic Stress Analysis rates roadways on a scale of 1 to 4, with 1 being the lowest stress and accessible for all user groups, and 4 being the most stressful with accessibility for only the most confident and experienced cyclists.

Northwest Quadrant
The Northwest Quadrant of Norco is defined by Norco College, Lake Norconian, and access across the Santa Ana River on River Road and Hamner Avenue. The recommendations for this area are focused on providing connectivity to the existing bike lane on Corydon Avenue and Norco Drive and making it easier to cross Hamner Avenue on Fifth Street and Norco Drive.

Recommendations
• Norco Drive and Corydon Avenue - This recommendation
adds a buffer and/or physical barriers to the existing Class II bike lane on Norco Drive and Corydon Avenue to continue the connection into Corona to the south. According to the Needs Analysis, Norco Drive has a Bicycle LTS score of 3 out of 4 indicating moderately high level of traffic stress. Slimming lanes to 10’ to add a buffer and barrier will help to lower this score.

NORCO DRIVE EXISTING ROADWAY

NORCO DRIVE PROPOSED

PLANTED
BUFFER 5’

PLANTED
BUFFER
5’
SIDEWALK 5’

BIKE LANE
4’

BIKE LANE
4’
RIGHT OF WAY 50’
TRAVEL LANE 10’ TRAVEL LANE 10’
BUFFER
3’
BUFFER
3’

REAR PROPERTY WALL OR FRONT YARD FENCE

EQUESTRIAN TRAIL
10 ’ PARKING
8’
PARKING 8’

PLANTED
BUFFER 7’

PLANTED
BUFFER 7’

MIXED USE TRAIL
12’ 12’

BIKE LANE
5’

BIKE LANE
5’ TRAVEL LANE 12’

RIGHT OF WAY
50’
TRAVEL LANE 12’ PARKING 8’ PARKING
8’

REAR PROPERTY WALL OR FRONT YARD FENCE

Page 242 of 628 ends

122
• W Fifth Street - This recommendation provides a Class II connection on the west side of I-15 and a Class III on the east side of I-15. Fifth Street has a Bicycle LTS score of 4. Fifth Street, on the east side of Norco, is also a border road of a neighborhood with the highest untapped bicycle demand in Norco, as shown in the Needs Analysis chapter.
• Norconian Drive - This recommendation provides a northsouth Class II connection between the proposed bike lane on Fifth Street and Norco Drive. The ROW on Norconian Drive has two 14’ drive lanes. An uphill Class II bike lane could be added by slimming each lane to 12’.
• Broken Lance Drive and Silver Cloud Drive - This is a Class III bicycle boulevard that provides a neighborhood connection from Fifth Street to Norco Drive.

Norco Drive has existing Class II bike lanes, which should be upgraded to Class IIb bike lanes.

PLANTED
BUFFER
7’

PLANTED
BUFFER
7’
TRAVEL
LANE
14’
TRAVEL
LANE
14’

STREET RIGHT OF WAY
28’
TRAVEL
LANE
12’
TRAVEL
LANE
14’

STREET RIGHT OF WAY
28’

PLANTED
BUFFER
7’

PLANTED
BUFFER
7’
BIKE
LANE
4’

NORCONIAN DRIVE EXISTING ROADWAY NORCONIAN DRIVE PROPOSED

Page 243 of 628 ends

123
Figure 52. Northwest Quadrant Bicycle Recommendations

HALF MOON
!
!
!
15 Makin/Shearer
Sports Complex
Corydon
Staging
Area

NAVAL SEA

SYSTEMS

COMMAND
Schools
Navy Base
Parks
Water Bodies
Norco Boundaries

BASEMAP

HAMNER AVE
CORY
D
O
N
AVE

RIVER RD

FIFTH ST

NORCO DR

BROKEN LANCE DR
Santa Ana
River
Lake
Norconian

EASTVALE

CITY OF NORCO

EXISTING BIKEWAYS
Class 2 Bike Lane

BICYCLE

RECOMMENDATIONS
Class 1
Class 2
Class 2b
Class 3b
0 0.2 0.4 MILES

NORTHWEST QUADRANT

BICYCLE

RECOMMENDATIONS

NORCONIAN DR

Page 244 of 628 ends

124
Southwest Quadrant
The Southwest Quadrant of Norco is defined by Norco College, the border of Norco and Corona, and the presence of three schools on Parkridge Avenue. The major recommendations improve
upon existing bike lanes on River Road, enhance access to Norco College, and create bike routes on Parkridge Avenue and First Street. Additionally, improving trail cut-throughs to Norco College will greatly increase connectivity to the neighborhoods of Norco.

This section specifically avoids Second Street due to its high Level of Traffic Stress, poor street conditions, and the planned Palomino Business Park, an industrial facility that will bring an increased amount of truck traffic.

Recommendations
• River Road - This recommendation adds physical barriers to the existing Class II on River Road. This is an important regional connection between Corona, through Norco, into Eastvale across the Santa Ana River. There have been 2
bicycle collisions on River Road; adding physical barriers will greatly increase the safety of cyclists. Physical barriers can be flex posts or K71 bollards, or in the long term a concrete curb barrier. Through lane slimming and flipping parking, a buffer can be added, as well as parking protection for cyclists. • Parkridge Avenue - This recommendation provides a Class II bike lane by slimming lanes in front of the three schools on the border of Norco and Corona. This will help to slow cars within the school zone and provide access for students cycling to school. This bike lane continues as a Class III through the neighborhood to the Class II on Belgian Drive.
• W Third Street - This recommendation provides a Class II bike lane across Hamner Ave and I-15 to Norco College. This bike lane would fit in the existing right of way and provide safe and convenient multimodal access for students. This street is also the site of the planned Norco Valley Square development, and will provide multimodal connectivity to residents and visitors of the new mixed use development. Third Street is also a key crossing location of Hamner Avenue, the most dangerous and largest street in Norco, with a LTS level of 4 for both pedestrians and cyclists and a high relative number of collisions.

TRAVEL
LANE
10’
TRAVEL
LANE
10’
TRAVEL
LANE
10’
TRAVEL
LANE
10’
TRAVEL
LANE
10’
TRAVEL
LANE
10’

RIGHT OF WAY
74’

MEDIANS
14’
TRAVEL
LANE
10’
TRAVEL
LANE
10’
TRAVEL
LANE
10’
TRAVEL
LANE
10’
BIKE
LANE
6’ 4’

RIGHT OF WAY
74’

MEDIANS
14’
BUFFER
BIKE
LANE
4’ 6’
BUFFER

W THIRD STREET EXISTING ROADWAY

W THIRD STREET PROPOSED

SIDEWALK

SIDEWALK

SIDEWALK

SIDEWALK

Page 245 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
125
• First Street - This Class II connection to Hamner Avenue provides bike access from the neighborhood to retail at the intersection of Hamner Avenue and First Street. This connection also provides continuity to the existing bike lane in Corona on Lincoln Avenue. This street has the highest level of Bicycle Level of Traffic Stress (4) and adding a bicycle lane will significantly improve that metric. The travel lanes can be slimmed to accomodate a bike lane. Between Mountain
Avenue and Parkridge Avenue, First Street significantly narrows, so the bike facility will have to be converted into a Class IIIB with traffic calming.
• Third Street Connector - This Class I recommendation
formalizes the existing trail and cut-through between
Mountain Avenue and Third Street. This would improve
connections to the neighborhoods south of Norco College • Belgian Drive - This Class III recommendation continues the connection from Third Street to the existing bike land on Corydon Drive. Speed mitigation measures should be taken to improve safety and the experience for pedestrians, cyclists, and equestrians.

FIRST STREET EXISTING ROADWAY

FIRST STREET PROPOSED
TRAVEL
LANE
13’
TRAVEL
LANE
13’

TWO WAY

TURN LANE
12’

RIGHT OF WAY
50’
TRAVEL
LANE
12’

PLANTED
BUFFER
1ST

SIDEWALK SIDEWALK

PLANTED

BUFFER RIGHT OF WAY
50’
TRAVEL
LANE
10’
TRAVEL
LANE
10’
TRAVEL
LANE
10’
TRAVEL
LANE
10’
BIKE
LANE
5’
BIKE
LANE
5’

SIDEWALK SIDEWALK

Page 246 of 628 ends

126
Figure 53. Southwest Quadrant Bicycle Recommendations
!
!
!
!
!
15 NORCO COLLEGE

RIVER RD

PARKRIDGE AVE

SECOND ST HAMNER AVE

CORYDON AVE

FIRST ST

BELGIAN DR

DALES DR

THIRD ST

LINCOLN AVE

W RINCON ST
Santa Ana
River
CORONA

CITY OF NORCO

EXISTING BIKEWAYS
Class 2 Bike Lane
Class 3 Bike Route
Schools
Norco College
Parks
Water Bodies
Norco Boundaries

BASEMAP

BICYCLE

RECOMMENDATIONS
Class 1
Class 2
Class 2b
Class 3b
0 0.2 0.4 MILES

SOUTHWEST QUADRANT

BICYCLE

RECOMMENDATIONS

Page 247 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
127
Northeast Quadrant
The Northeast Quadrant of Norco is defined by Sixth Street, Norco’s city center, as well as the intersection with River Trails Park, Hidden Valley Wildlife Area, and Ingalls Park. Corona Avenue is also a major thoroughfare for the east side of the City, on which many of Norco’s schools are located.

Recommendations
• North Drive/California Avenue/Eighth Street - This Class III segment, recommended on the public input map, provides
a continuation of the existing bike lane on Arlington Avenue just outside of Norco. This provides access to the Hidden Valley Wildlife Area, a popular spot for cyclists. Traffic calming measures should be taken to ensure cyclist safety.
• Pedley Avenue - This north-south Class III connection provides access to River Trails Park and a continuation of the Eighth Street bike lane to Seventh Street and Sixth Street. • Seventh Street - This Class III bike lane connects Pedley Avenue to the other north-south bike lane on Corona Avenue.

This facility could be upgraded to a Class I or II should the ROW expand into the shoulders.
• River Road - This Class III segment provides access to many of the trails along the Santa Ana River as well as connections between Seventh Street and Pedley Avenue. Improvements to calm traffic and mitigate speed should be implemented. The shoulder of this road is also wide enough that it can potentially be a Class I in some segments.

Arlington Avenue (above) just outside of Norco is a key connection to the Hidden Valley Wildlife Area which has existing bike lanes. However, these lanes drop upon entry into Norco. These lanes should be continued on North Drive and California Avenue.

Page 248 of 628 ends

128
TRAVEL
LANE
12’

RIGHT OF WAY
62’

TWO WAY

TURN LANE
12’
TRAVEL
LANE
12’
TRAVEL
LANE
13’
TRAVEL
LANE
13’

PLANTED
BUFFER

PLANTED
BUFFER

EQUESTRIAN
TRAIL

EQUESTRIAN
TRAIL
4’ 4’

PLANTED
BUFFER

PLANTED
BUFFER
TRAVEL
LANE
11’
TRAVEL
LANE
11’

RIGHT OF WAY
62’

TWO WAY

TURN LANE
10’
TRAVEL
LANE
11’
TRAVEL
LANE
11’

EQUESTRIAN
TRAIL

EQUESTRIAN
TRAIL
BIKE
LANE
BIKE
LANE
4’ 2’ 2’
4’
TRAVEL
LANE
10’
TRAVEL
LANE
10’

RIGHT OF WAY
62’

TWO WAY

TURN LANE
10’
TRAVEL
LANE
10’
TRAVEL
LANE
10’

PLANTED
BUFFER

PLANTED
BUFFER

EQUESTRIAN
TRAIL

EQUESTRIAN
TRAIL
BIKE
LANE
BUFFER
BIKE
LANE
BUFFER
SIXTH STREET PROPOSED 1

SIXTH STREET EXISTING
SIXTH STREET PROPOSED 2
• Sixth Street - Although this Plan does not recommend a bike facility along Sixth Street, there is the potential for a longterm redesign of Sixth Street, one of Norco’s most prominent streets. This street is home to many iconic local businesses and hosts many town festivals and parades. It also terminates at Pikes Peak Park, a popular spot for residents to park and begin hikes at Pumpkin Rock, and Ingalls Park, another popular destination within Norco. There have been 2 collisions resulting in injuries on Sixth Street. Considering a bike lane and introducing traffic calming measures along this corridor, the Level of Traffic Stress and safety will improve for all road users. The bike lane can be added by modifying the Right of Way; slimming lanes to 11’ and a 10’ turn lane, and a buffer can be added by making all lanes 10’. While there is space to add bike lanes withouth removing travel or turn lanes, it would likely be a diminished experience for all road users. The best option to accomodate bikes along Sixth Street would be to remove the center turn lane and slim travel lanes.

Page 249 of 628 ends

129
Figure 54. Northeast Quadrant Bicycle Recommendations
SCHOOL

ELEMENTARY

HIGHLAND
!
!
!
15 !
River
Trails
Park
Hidden Valley
Wildlife Area
Ingalls Park

EVA AINROFILAC

FIFTH ST

EVA RENMAH

HILLSIDE AVE

SIXTH ST

SEVENTH ST

RIVER DR

NORTH DR

EIGHTH ST

CORONA AVE

PEDLEY AVE
Santa
Ana
River

RIVERSIDE

JURUPA VALLEY EASTVALE

CITY OF NORCO
Schools
Parks
Water Bodies
Norco Boundaries

BASEMAP

EXISTING BIKEWAYS
Class 1 Bike Lane
Class 3 Bike Route
Class 2 Bike Lane

BICYCLE

RECOMMENDATIONS
Class 1
Class 2
Class 2b
Class 3b
0 0.2 0.4 MILES

NORTHEAST QUADRANT

BICYCLE

RECOMMENDATIONS

SIXTH STREET EXISTING ROADWAY

Page 250 of 628 ends

130
Southeast Quadrant
The Southeast Quadrant of Norco is defined by Temescal Avenue, on which Norco High School, Norco Intermediate School, and Norco Elementary School are located. The recommendations for this area focus on improving safety along Temescal Avenue, connections to Hidden Valley Parkway, as well as an east-west connection along Third Street to cross Hamner Avenue.

Recommendations
• Temescal Avenue - This recommendation creates a Class III bicycle boulevard along Temescal Avenue to provide a safer bicycling corridor for the schools. The elements of a bicycle boulevard that could be included to calm traffic are curb extensions, pedestrian crossing beacons, crosswalks, speed bumps, and pedestrian islands. This street also connects the southern neighborhood of Norco Hills with the rest of the City to the north, through a neighborhood with the highest latent bicycle demand in Norco. In the long term, the shoulder could be expanded and formalized with a Class I path.

BUFFER

PRIVATE

PROPERTY

SIDEWALK

TURN LANE
11’

RIGHT OF WAY
50’

TRAVEL AND

PARKING LANE
19’

TRAVEL AND

PARKING LANE
20’

SCHOOL FENCING
BUFFER

PRIVATE

PROPERTY

TRAVEL SIDEWALK
LANE
11’
TRAVEL
LANE
11’
TURN
LANE
11’

RIGHT OF WAY
50’

PARKING LANE

SCHOOL FENCING

PEDESTRIAN ISLANDS
/MEDIANS

CURB EXTENSIONS
8’

PARKING
LANE
8’
2’

PRIVATE

PROPERTY

SIDEWALK

TURN LANE
10’

TRAVEL LANE
10’

TRAVEL LANE
10’

TWO WAY

CYCLE TRACK
10’

RIGHT OF WAY
50’

PARKING
LANE
8’

SCHOOL FENCING

BUFFER BUFFER

TEMESCAL EXISTING ROADWAY
TEMESCAL PROPOSED 1
TEMESCAL PROPOSED 2

Page 251 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
131
• Third Street - This recommendation creates a Class III connection from Temescal Avenue to Hamner Avenue and the west side of Norco along Third Street
• First Street/Corona Avenue/Thoroughbred Lane/Rock
Springs Avenue - This Class III loop through the neighborhood provides connections to the north-south corridor on Temescal Avenue and the existing bike lane on Hidden Valley Boulevard. • Harness Lane/Rock Springs Avenue - This Class I cut-through can increase connectivity through the nearby neighborhoods.

By adding paving and lighting, this cut through would be more convenient for cyclists.
• Harness Lane/Gunsmoke Road/El Paso Drive - This
recommendation provides a Class III connection from the neighborhood to the existing bike lane on Hidden Valley Boulevard, which are popular starting points for local bike rides.

Temescal Avenue is a major school corridor. Speed mitigation is important on this road to improve cycling and walking conditions.

Page 252 of 628 ends

132
Figure 55. Southeast Quadrant Bicycle Recommendations
!
!
!
!
!
15 T
E
M
E
S
C
AL
AVE

HIDDEN VALLEY PKWY

HAMNER AVE

FIFTH ST

EVA EDISLLIH

FOURTH ST

SECOND ST

THIRD ST

FIRST ST

EL PASO DR

ROCK SPRINGS
AVE
CORONA

CITY OF NORCO

EXISTING BIKEWAYS
Class 2 Bike Lane

BASEMAP
Schools
Parks
Water Bodies
Norco Boundaries

BICYCLE

RECOMMENDATIONS
Class 1
Class 2
Class 2b
Class 3b
0 0.25 0.5 MILES

SOUTHEAST QUADRANT

BICYCLE

RECOMMENDATIONS

Page 253 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
133
End of trip facilities
At key destinations within the network of bicycle routes around the City, facilities should be installed to improve the experience of the user. These facilities can include:
• Bike Racks and Storage Lockers
• Bike Repair Stations
• Water Fountains
Key destinations include parks, schools, shopping centers, and other popular local destinations. These areas could also provide programmed events like Recyclery bike repair workshops and meeting places for group rides.

Bike Racks.

Bike Repair Station Bike Racks and Storage Lockers

Page 254 of 628 ends

134
Figure 56. End of Trip Facilities
91 15
River
Trails
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Doty Tr
Park
Park

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND

SECOND ST PARKRIDGE AVE

EVA AINROFILAC

TEMESCAL AVE
H

I DDEN VA
LLEY P
K WY

EVA RENMAH

FIFTH ST

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVERRD
NORCO
D
R

SIXTH ST
CORONA

EASTVALE

CITY OF NORCO JURUPA VALLEY

BICYCLE

RECOMMENDATIONS
End of Trip Facilities
Class 1
Class 2
Class 2b
Class 3
0 0.5 1 MILES

END OF TRIP FACILITIES

RECOMMENDATIONS

THIRD ST

SEVENTH ST

NORCONIAN DR

PEDLEY AVE

RIVER DR CORONA AVE

FIRST ST

EL PASO DR

NORTH DR

DALES DR

BROKEN LANCE DR

Page 255 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
135
This page intentionally left blank

Page 256 of 628 ends

136
Pedestrian Recommendations
Northwest Quadrant
Pedestrian Spot Improvements
Recommended pedestrian spot improvements in the Northwest Quadrant include:
• High visibility crosswalks
• Pedestrian refuge islands
• Curb extensions
• Curb ramps
• Leading pedestrial intervals (LPI)
Alhambra Street at Rocky View Road/River Ridge Drive - These two intersections, located next to Highland Elementary School, would be improved by upgrading the existing crosswalks to high visibility crosswalks and installing curb extensions to shorten crossing distances.

Norco Drive - This segment of Norco Drive has several large intersections. Pedestrian improvements including high visibility crosswalks, curb extensions, and curb ramps will make crossing safer and improve accessibility.

Norco Drive at Hamner Avenue - This intersection is one of the largest in Norco. Improvements to pedestrian safety and access will require high visibility crosswalks, curb extensions, and pedestrian islands.

Curb extensions and high visibility crosswalks are recommended for the intersection of Norco Drive and Cedar Avenue.

Fifth Street at Hamner Avenue - This intersection is a key route to cross Hamner Avenue and I-15, and is a major eastwest corridor in Norco. Pedestrian improvements include high visibility crosswalks, curb extensions, and leading pedestrian traffic signals (LPI).

Fifth Street at Sierra Avenue - This small intersection is part of a key corridor in Norco. Adding high visibility crosswalks and curb ramps will make the existing 4-way stop safer and more accessible.

Hamner Avenue at Fourth Street - This major intersection would be improved for pedestrians by installing high visibility crosswalks and curb extensions to shorten the crossings.

Lampton Lane at Hamner Avenue - This smaller T-intersection would be made safer for pedestrians by installing a high visibility crosswalk across Lampton Lane

Page 257 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
137
A multi-use path is proposed along an existing trail (above), between residential neighborhoods and Shearer Park.

Pedestrian Corridor Improvements
Recommended pedestrian corridor improvements in the
Northwest Quadrant include:
• New sidewalks
• New shared-used path
Fifth Street - This arterial street connects the main commercial corridor of Norco and Neal Snipes Park to Shearer Park.

Extending the recently installed sidewalk at Fifth Street/ Horseless Carriage Drive to Corydon Drive would connect these major destinations to residential neighborhoods and a proposed paved shared path along Western Avenue.

Western Avenue - A multi-use path along Western Avenue
would directly connect residential neighborhoods in the area to Shearer Park and accommodate pedestrians and cyclists in addition to equestrians.

Hamner Avenue - This main thoroughfare would be improved for pedestrians by installing new sidewalks to fill in small gaps in the existing network.

Filling the sidewalk gap here on Hamner Avenue would connect an existing sidewalk to a scramble crosswalk at Hamner Avenue and Fifth Street.

Page 258 of 628 ends

138
Figure 57. Northwest Quadrant Pedestrian Recommendations

HALF MOON
!
!
!
!
!
!
!
!
!
!
! !
!
15 Makin/Shearer
Sports Complex
Corydon
Staging
Area

NAVAL SEA

SYSTEMS

COMMAND
Schools
Navy Base
Parks
Water Bodies
Norco Boundaries

BASEMAP

HAMNER AVE
CORY
D
O
N
AVE

RIVER RD

FIFTH ST

NORCO DR
Santa Ana
River
Lake
Norconian

EASTVALE

CITY OF NORCO

PEDESTRIAN

RECOMMENDATIONS
Spot
Improvements
Multi-use Path
Sidewalk
Street Lighting
!
0 0.2 0.4 MILES

NORTHWEST QUADRANT

PEDESTRIAN

RECOMMENDATIONS

WESTERN AVE

NORCONIAN DR

ALHAMBRA ST

Page 259 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
139
Corridor Cross Street Treatment
Alhambra Street River Ridge Drive High visibility crosswalks, curb extensions Alhambra Street Rocky View Road High visibility crosswalks, curb extensions Hamner Avenue Fifth Street High visibility crosswalks, curb extensions Hamner Avenue Fourth Street High visibility crosswalks, curb extensions Hamner Avenue Lampton Lane High visibility crosswalk (across Lampton Lane) Hamner Avenue Norco Drive High visibility crosswalks, curb extensions, pedestrian refuge islands (on north and south legs of intersection)
Norco Drive Norconian Drive High visibility crosswalks, curb extensions, curb ramps Norco Drive River Ridge Drive High visibility crosswalks, curb ramps Norco Drive Rocky View Road High visibility crosswalks, curb extensions Table 5. Northwest Quadrant Pedestrian Spot Recommendations Table 6. Northwest Quadrant Pedestrian Corridor Recommendations Corridor Treatment
Fifth Street Install sidewalk on north side of Fifth Street from Hamner Avenue to Horseless Carriage Drive Fifth Street Extend sidewalk from Horseless Carriage Drive to Corydon Avenue Hamner Avenue Install sidewalks to complete gaps near Fourth Street and Fifth Street Norconian Drive Install sidewalk on Norconian Drive from Norco Drive to Fifth Street Western Avenue Install paved, multi-use path from Appaloosa Street to Wayne Makin/Shearer Park

Page 260 of 628 ends

140
SouthWest Quadrant
Pedestrian Spot Improvements
Recommended pedestrian spot improvements in the Southwest Quadrant include:
• High visibility crosswalks
• Pedestrian refuge islands
• Curb extensions
• Curb ramps
• Rectangular rapid-flashing beacons (RRFB)
• Leading pedestrian intervals (LPI)
This quadrant borders the City of Corona to the south; these recommendations intersect with existing infrastructure in Corona to help make a more cohesive network across the two cities.

First Street at Parkridge Avenue/Mountain Avenue/Hamner Avenue - First Street has a proposed bicycle connection from River Road to Hamner Avenue. By improving pedestrian infrastructure at the intersections, this corridor can become a safe multimodal street. Improvements that are suggested include high visibility crosswalks and curb extensions.

Second Street at Parkridge Avenue - This intersection is a key intersection within a school zone. Installing high visibility crosswalks will improve the safety of this intersection.

Second Street at River Road/Western Avenue/Pacific Avenue/ Hamner Avenue - This series of intersections along Second Street provides a safe corridor for the neighborhood west of the school zone and the commercial district on Hamner Avenue.

Installing high visibility crosswalks, curb extensions, pedestrian islands, and curb ramps will improve safety and accessibility.

Third Street at Hamner Avenue - This intersection is one of the largest and busiest in Norco. Third Street is a major eastwest connection for pedestrians and bicycles crossing Hamner Avenue and I-15, and also provides access to Norco College and the eastern school corridor along Temescal Avenue. This intersection should be improved with high visibility crosswalks, curb extensions, and leading pedestrian intervals.

Third Street at Norco Campus Office Park - A midblock, high visibility crossing will provide safer pedestrian access between the new Norco Valley Square development and Norco College.

Page 261 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
141
Recommendations for the major intersection at Third Street and Hamner Avenue include high visibility crosswalks, curb extensions, and LPIs.

Pedestrian Corridor Improvements
Recommended pedestrian corridor improvements in the
Southwest Quadrant include:
• New sidewalks
River Road and Hamner Avenue - Completing the sidewalk
network and filling in gaps will help to improve pedestrian connectivity in the area.

High visibility crosswalks are recommended at Second Street and Parkridge Avenue, near Victress Bower Elementary School.

Extending the sidewalk along River Road would connect Auburndale Intermediate School to existing pedestrian infrastructure to the northwest.

Page 262 of 628 ends

142
Figure 58. Southwest Quadrant Pedestrian Recommendations N Lincoln Ave

P A R K

BUTTERFIELD
!
!
!
!
!
! ! ! !
! !
!
!
! !
! !

NORCO COLLEGE

RIVER RD

PARKRIDGE AVE

SECOND ST HAMNER AVE

CORYDON AVE

FIRST ST

WESTERN AVE
Santa Ana
River
CORONA

AUBURNDALE

INTERMEDIATE
SCHOOL

GEORGE WASHINGTON

ELEMENTARY
SCHOOL

CITY OF NORCO
Schools
Norco College
Parks
Water Bodies
Norco Boundaries

BASEMAP

PEDESTRIAN

RECOMMENDATIONS
! Spot
Improvements
Multi-use Path
Sidewalk
Street Lighting
0 0.2 0.4 MILES

SOUTHWEST QUADRANT

PEDESTRIAN

RECOMMENDATIONS

Page 263 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
143
Table 7. Southwest Quadrant Pedestrian Spot Recommendations Table 8. Southwest Quadrant Pedestrian Corridor Recommendations Corridor Cross Street Treatment
First Street Hamner Avenue High visibility crosswalks, curb extensions First Street Mountain Avenue High visibility crosswalks First Street Parkridge Avenue High visibility crosswalks, curb extensions Parkridge Avenue Western Avenue High visibility crosswalks, curb extensions (northwest corner of intersection) Second Street Hamner Avenue High visibility crosswalks
Second Street Pacific Avenue High visibility crosswalks, curb ramps Second Street Parkridge Avenue High visibility crosswalks Second Street River Road High visibility crosswalks, curb extensions, pedestrian refuge islands Second Street Western Avenue High visibility crosswalks, curb ramps Third Street Hamner Avenue High visibility crosswalks, curb extensions, leading pedestrian interval (LPI) Third Street (mid-block) Hamner Avenue High visibility crosswalk (near Third FS Hamner bus stop) Corridor Treatment
Hamner Avenue Install sidewalk on east side of street to complete gap near Hidden Valley Parkway Hidden Valley Parkway Install sidewalk on north side of street to complete gap along Hidden Valley Parkway River Road Install sidewalk on north side of River Road to complete gap from Auburndale Intermediate School to Second Street

Page 264 of 628 ends

144
Northeast Quadrant
Pedestrian Spot Improvements
Recommended pedestrian spot improvements in the Northeast Quadrant include:
• High visibility crosswalks
• Curb ramps
• Leading pedestrian intervals (LPI)
• Stop signs
Fifth Street at Valley View Avenue/Temescal Avenue/Hillside Avenue/Pedley Avenue - Fifth Street is an important eastwest connection across the City. It also leads to the east side school corridor on Temescal Avenue, making it an important route for many students walking to school. Adding high visibility crosswalks and curb ramps will help to formalize and improve the safety of the pedestrian network.

Sixth Street at Valley View Avenue/Corona Avenue/Temescal Avenue/Center Avenue/Hillside Avenue/Pedley Avenue/
California Avenue/Crestview Drive/Ingalls Park - Sixth Street is Norco’s main street, home to many of the City’s notable local businesses and sites, and is the location of many town parades and festivals. Sixth Street also terminates at Ingalls Park and Pumpkin Rock, both notable destinations within Norco. To improve the pedstrian experience of this street, the crossings should be made safer via high visibility crosswalks and leading pedestrian intervals.

Seventh Street at Center Avenue/Hillside Avenue/Pedley
Avenue/California Avenue - These intersections along Seventh Street are all near Riverview Elementary School. Improving these intersections will help to make walking and biking to school safer for students. These improvements should include high visibility crosswalks and curb ramps.

Eighth Street at Pedley Avenue/California Avenue - Eighth Street has a proposed bicycle connection to the existing bike lanes outside of Norco and is just north of Riverview Elementary School. Adding high visibility crosswalks, 3-way stop signs, and curb ramps will improve pedestrian safety and connectivity.

Crestview Drive - This mid-block high visibility crosswalk will help improve pedestrian connections to the south side of Ingalls Park.

Temescal Avenue - Upgrading the existing crosswalk in front of Sierra Vista Elementary to high visibility will help improve pedestrian visibility and access to the school.

Page 265 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
145
Recommendations for intersections along Sixth Street include high visibility crosswalks and LPIs.

High visibility crosswalks, curb ramps, and stop signs at the intersection of Eighth Street and Pedley Avenue are recommended to increase pedestrian safety.

The existing crosswalk in front of Sierra Vista Elementary School should be upgraded to a high visibility crosswalk.

Improvements like high visibility crosswalks and curb ramps at intersections along Fifth Street will increase the safety of those walking to nearby schools.

Page 266 of 628 ends

146
Figure 59. Northeast Quadrant Pedestrian Recommendations

P A R K

NEIL SNIPES
!
!
! !
!
! ! !
!
! ! !
! ! !
! ! !
! !
!
!
!
! ! ! !
!
!
!
15 River
Trails
Park
Hidden Valley
Wildlife Area
Ingalls Park

EVA AINROFILAC

FIFTH ST

EVA RENMAH

HILLSIDE AVE

PEDLEY AVE

TMEESCAL AVE

CENTER AVE

CORONA AVE

VALLEY VIEW AVE

SIERRA AVE

CRESTVIEW DR

EIGHTH ST

RIVERVIEW

ELEMENTARY
SCHOOL

SIERRA VISTA

ELEMENTARY
SCHOOL

SIXTH ST
Santa
Ana
River

RIVERSIDE

JURUPA VALLEY EASTVALE

CITY OF NORCO
Schools
Parks
Water Bodies
Norco Boundaries

BASEMAP

PEDESTRIAN

RECOMMENDATIONS
Spot
Improvements
Sidewalk
Street Lighting
!
0 0.2 0.4 MILES

NORTHEAST QUADRANT

PEDESTRIAN

RECOMMENDATIONS

Page 267 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
147
Table 9. Northeast Quadrant Pedestrian Spot Recommendations Corridor Cross Street Treatment
Corona Avenue Sears Street High visibility crosswalk
Crestview Drive NA High visibility crosswalk (connecting to Pumpkin Rock Trailhead) Eighth Street Pedley Avenue High visibility crosswalks, 3-way stop signs Eighth Street California Avenue High visibility crosswalks, curb ramps Fifth Street Corona Avenue High visibility crosswalks, curb ramps Fifth Street Hillside Avenue High visibility crosswalks Fifth Street Pedley Avenue High visibility crosswalks, curb ramps Fifth Street Sierra Avenue High visibility crosswalks, curb ramps Fifth Street Temescal Avenue High visibility crosswalks Fifth Street Valley View Avenue High visibility crosswalks, curb ramps Seventh Street California Avenue High visibility crosswalks, curb ramps Seventh Street Center Avenue High visibility crosswalks, curb ramps Seventh Street Hillside Avenue High visibility crosswalks, curb ramps Seventh Street Pedley Avenue High visibility crosswalks, curb ramps Sixth Street California Avenue High visibility crosswalks, leading pedestrian intervals (LPIs) Sixth Street Center Avenue High visibility crosswalks
Sixth Street Corona Avenue High visibility crosswalks, leading pedestrian intervals (LPIs) Sixth Street Crestview Drive High visibility crosswalks Sixth Street (mid-block) Crestview Drive High visibility crosswalk (in front of Pikes Peak Park parking lot)

Page 268 of 628 ends

148
Table 10. Northeast Quadrant Pedestrian Spot Recommendations (cont.) Corridor Cross Street Treatment
Sixth Street Hillside Avenue High visibility crosswalks Sixth Street Pedley Avenue High visibility crosswalks, leading pedestrian intervals (LPIs) Sixth Street Temescal Avenue High visibility crosswalks, leading pedestrian intervals (LPIs) Sixth Street Valley View Avenue High visibility crosswalks, leading pedestrian intervals (LPIs)

Page 269 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
149
This page intentionally left blank

Page 270 of 628 ends

150
Southeast Quadrant
Pedestrian Spot Improvements
Recommended pedestrian spot improvements in the Southeast Quadrant include:
• High visibility crosswalks
• Curb extensions
• Curb ramps
• Stop signs
• Rectangular rapid-flashing beacons (RRFB)
First Street at Rock Springs Avenue - This intersection is located within the Norco Hills neighborhood of southeast Norco.

It is a gateway intersection to Temescal Avenue and a popular route for cyclists. Installing high visibilty crosswalks at this intersection will help to formalize crossings.

Third Street at Corona Avenue/Valley View Avenue - Third Street is a major east-west corridor with a proposed bike lane that connects to Temescal Avenue. Adding crosswalks, curb extensions, and curb ramps will create a safer pedestrian experience.

Fourth Street at Valley View Avenue/Corona Avenue/Temescal Avenue - Fourth Street is an important route to schools, connecting Corona Avenue and Temescal Avenue. Adding high visibility crosswalks, curb ramps, and 3-way stop signs will help to formalize the crossings on Fourth Street and make the pedestrian experience safer and more comfortable overall.

Reservoir Drive at Curtis Drive - This oversized intersection is in close proximity to Norco Intermediate School. Installing high visibility crosswalks, 3-way stop signs, and curb extensions will help scale down this intersection and make it more accessible for pedestrians.

Temescal Avenue at Reservoir Drive/Curtis Drive/Third
Street/Second Street - Temescal Avenue is a major school corridor in the east side of Norco. Norco Elementary School, Norco Intermediate School, and Norco High School are all located on Temescal Avenue. Adding crossing beacons, high visibility crosswalks, curb ramps, and curb extensions to these intersections will make this street safer for students walking to school.

High visibility crosswalks and curb ramps at Fourth Street and Temescal Avenue would make it safer for students walking to nearby school.

Page 271 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
151
Pedestrian Corridor Improvements
Recommended pedestrian corridor improvements in the
Southeast Quadrant include:
• New sidewalks
• Lighting
Temescal Avenue - Installing street lighting and sidewalks along Temescal Avenue will help to create a safer pedestrian environment in front of the schools and provide safer routes to schools. However, there is a concern from residents and the STUC committee that adding lighting will impact Norco’s rural character. This should be considered and more thoroughly evaluated before installing street lighting.

Lighting is recommended along Temescal Avenue to improve the visibility of students walking to and from school at night.

The wide intersection at Reservoir and Curtis Drive would be made safer with high visibility crosswalks, 3-way stop signs, and curb extensions.

Extending the sidewalk in front of Norco High School south to Norco Elementary School will create a safer walking environment for students.

Page 272 of 628 ends

152
Figure 60. Southeast Quadrant Pedestrian Recommendations !
!
!
!
!
! !
!
!
!
!
! ! ! ! ! !
!
!
! ! !
!
!
!
!
! !
!
! ! 15

FIRST ST
T
E
M
E
S
C
AL
AVE

HIDDEN VALLEY PKWY

HAMNER AVE

FIFTH ST

EVA EDISLLIH

FOURTH ST

SECOND ST

THIRD ST

RESERVOIR DR
CORONA

CITY OF NORCO

PEDESTRIAN

RECOMMENDATIONS
Spot
Improvements
Sidewalk
Street Lighting
!
Schools
Parks
Water Bodies
Norco Boundaries

BASEMAP
0 0.25 0.5 MILES

SOUTHEAST QUADRANT

PEDESTRIAN

RECOMMENDATIONS

Page 273 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
153
Table 11. Southeast Quadrant Pedestrian Spot Recommendations Table 12. Southeast Quadrant Pedestrian Corridor Recommendations Corridor Cross Street Treatment
First Street Rock Springs Avenue High visibility crosswalks Fourth Street Corona Avenue High visibility crosswalks, curb ramps Fourth Street Temescal Avenue (eastern
intersection) High visibility crosswalk, 3-way stop signs Fourth Street Temescal Avenue (western
intersection) High visibility crosswalks, curb ramps
Fourth Street Valley View Avenue High visibility crosswalks Reservoir Drive Curtis Drive High visibility crosswalks, curb extensions, 3-way stop signs Temescal Avenue Curtis Drive High visibility crosswalk (southern leg of intersection), high intensity activated crosswalk (HAWK) beacon, curb ramps
Temescal Avenue Reservoir Drive High visibility crosswalks, curb extensions, rectangular rapid flashing beacon (RRFB) Temescal Avenue Second Street High visibility crosswalks Temescal Avenue Third Street High visibility crosswalk, 3-way stop signs Third Street Corona Avenue High visibility crosswalks, curb extensions, curb ramps Third Street Valley View Avenue High visibility crosswalks, curb ramps Corridor Treatment
Temescal Avenue Install sidewalks to complete gaps along the east side of Temescal Avenue, connecting Norco Intermediate School to Norco High School, and Norco High School to Norco Elementary School
Temescal Avenue Install pedestrian-scaled street lighting along Temescal Avenue in front of Norco Intermediate School Temescal Avenue Install pedestrian-scaled street lighting along Temescal Avenue in front of Norco High School Temescal Avenue Install pedestrian-scaled street lighting along Temescal Avenue in front of Norco Elementary School

Page 274 of 628 ends

154
ProgramMATIC
Recommendations
Transportation Integration
Closing the first/last mile gap around RTA bus stops can expand the number of trips that can be made using transit, encouraging more people to use those services for both commuting and service trips. Norco is served by the RTA line 3 bus, which traverses mainly along Hamner Avenue, where much of the existing pedestrian network is located. However, gaps in the sidewalk network along Hamner Avenue and little bicycle infrastructure hinders pedestrian and bicycle connectivity to the bus stops.

The proposed recommendations will enhance access to all RTA line 3 bus stops. Installing sidewalks to fill existing gaps on either side of Hamner Avenue will provide a complete and safe route for pedestrians walking to the stops. High visibility crosswalks and leading pedestrian intervals at intersections along Hamner Avenue will make pedestrians more visible while crossing and enhance overall safety. The proposed Class II bike route along Third Avenue will similarly provide a safe and complete route for bicyclists accessing the stops near Norco College.

Wayfinding Program
A bicycle and pedestrian network wayfinding system and
guide consists of comprehensive signing and/or pavement markings to guide people to key destinations. Wayfinding signs direct bicyclists and pedestrians along the existing bicycle and pedestrian network and to important community destinations such as libraries, schools, parks, shopping districts, and civic buildings. Wayfinding is an important tool which assists cyclists and pedestrians in easily and efficiently navigating throughout Norco. Signs along the bicycle and pedestrian network
should indicate the direction of travel, the locations of major destinations, and the time/distance to these destinations along the network. Norco does not have an existing wayfinding system for bicyclists or pedestrians.

This program could serve both wayfinding and safety purposes by helping users to:
• Become familiar with the network
• Identify the best routes to destinations
• Understand timing and distances to their destinations • Decreasing travel times and increasing convenience to users Wayfinding Recommendations: Develop a Comprehensive
Wayfinding Program
The City of Norco can develop and implement a comprehensive wayfinding program for bicyclists and pedestrians. The City should develop a wayfinding plan in order to involve the community in the creation of a design unique to Norco which will identify:
• Sign locations
• Sign type - what information should be included and design features
• Key destinations to be highlighted on each sign
• Approximate distance and/or travel time to each destination

Page 275 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
155
• Landscaping
• Public art
• Bike Signals and Prioritization
The bicycle and pedestrian recommendations within Norco create several interconnected loops around the City through different neighborhoods. As part of the wayfinding program tools like bicycle signals and signal actualization to improve signal timing for cyclists, and leading pedestrian intervals at crossings to improve crossing safety for pedestrians and horses should be implemented. These tools help to create a more holistic and comfortable network for all users.
10’
9’
8’
7’
6’
5’
4’
3’
2’
1’
Destination 1 15 min
10 min
Destination 3 5 min
Destination 2
Decision Turn Confirmation
24”
Wayfinding signage should use three sets of signage
strategically placed around the City. The first type allows for the users to choose their destination and provides a list of nearby points of interest. The second sign is at every turn along the intended route. The third sign provides confirmation to the user that they are still on the best route to their destination. Including walk or riding times to the destination on the route is also an effective way to contextualize distances within the City and allow users to make informed desicions. This is a useful strategy because many times the destination may feel further than it is, leading to many residents choosing cars as the preferred transportation option when walking or riding is feasible.

Page 276 of 628 ends

156
Figure 61. Wayfinding Signage and Bicycle Recommendations 91 15
River
Trails
Park
Hidden Valley
Wildlife Area
Makin/Shearer
Sports
Complex
Ingalls Park
Doty Tr
Park
Park

NORCO COLLEGE

NAVAL SEA

SYSTEMS

COMMAND

SECOND ST

PARKRIDGE AVE

EVA AINROFILAC

TEMESCAL AVE

HI DDENVALLEY PK WY

EVA RENMAH

FIFTH ST

EVA EDISLLIH

FIRST ST

CORYDON AVE

FOURTH ST

RIVERRD

NORCO DR

SIXTH ST

THIRD ST

SEVENTH ST

PEDLEY AVE

NORCONIAN DR

RIVER DR CORONA AVE

FIRST ST

EL PASO DR

NORTH DR

DALES DR

BROKEN LANCE DR
CORONA

EASTVALE

JURUPA VALLEY CITY OF NORCO

RECOMMENDATIONS
Wayfinding
Class 1
Class 2
Class 2b
Class 3
0 0.5 1 MILES

BIKE AND WAYFINDING

RECOMMENDATIONS

Page 277 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
157
Tracking Bicycle and Pedestrian Use
Surveys and active transportation counts can track walking and biking patterns before and after the installation of bicycle and pedestrian infrastructure, and after a programmatic event to evaluate if the improvement increased active transportation use.

Bicycle and Pedestrian Counts Methodology
The City of Norco can use the following as a guide for bicycle and pedestrian counting efforts. The City may choose to conduct counts with city staff, or recruit community based organizations and volunteers. The City may also elect to advertise counting efforts through the City’s email and social media networks.

Collected data will help identify common pedestrian and bicycle travel behavior, evaluate the impact of recently installed infrastructure or recently implemented programmatic events, and support future competitive funding applications.

Count Locations
The City should refer to SCAG’s Pedestrian Counter Siting Strategy, which considers land use, demographics, and
accessibility when selecting count locations.12 The Strategy can also be adapted to select bicycle count locations using the same methodology.

To identify locations that would likely serve a large number of people, especially those with limited transportation options, the City may utilize geospatial analysis to highlight areas of Norco that are densely populated, have lower-than-average median household incomes, and are in close proximity to key destinations like schools, public transportation, and employment centers.
12  https://atdb.scag.ca.gov/Documents/Pedestrian_Counter_Siting_Memo. pdf
The City may also choose to solicit feedback from community members and organizations to gain additional perspectives on where counts would be most useful.

Other qualitative factors that could be considered when selecting count locations include:
• Representative locations in a variety of areas across Norco; • Key corridors that could potentially be used to guage the impacts of future improvements (such as underpass
improvements or installation of bike facilities);
• Gaps, pinch points, and locations that are operationally difficult for bicyclists and pedestrians;
• Locations where bicycle and/or pedestrian collisions have occured;
• Varying land uses, on varying roadway types, and in locations where future improvements are expected
Count Scheduling
Times of days and days of the week for counts should be determined according to CalTrans Active Transportation
Program (ATP) grant guidance. Though these counts may not be used as part of an ATP grant application, the count data collection should be set up according to these requirements as this is one of the most important funding sources for active transportation improvements in the State of California.

CalTrans recommends that counts are collected on Tuesdays, Wednesdays, or Thursdays at both morning and evening
commute hours. Among those options, the day of the week for each location should be chosen according to volunteer or staff

Page 278 of 628 ends

158
availability. However, all counts should be conducted between 7:00 and 9:00 AM and between 4:00 and 6:00 PM to ensure compatibility with CalTrans methodology.

Per CalTrans requirements, counts are also to be conducted on one weekend day from 11:00 AM to 1:00 PM, or whatever the jurisdiction determines to be the peak time.

Additionally, the National Bike/Ped Documentation Project recommends scheduling annual counts for the same week each fall and spring. Their counts are generally performed in midSeptember, when students are back in school.

Page 279 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
159
This page intentionally left blank

Page 280 of 628 ends

160
05 IMPLEMENTATION

Page 281 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
161

IMPLEMENTATION
This chapter provides cost estimates, funding strategies, and a prioritized list of bicycle and pedestrian projects that can be utilized to implement the recommended bicycle and pedestrian facilities.

Funding Strategies
Facility Costs
Plan level cost estimates for the facilities recommended in this Plan are shown in Table 15. In addition to implementation costs, maintenance costs will need to be considered before constructing a project. Maintenance costs can vary depending on whether it is performed by Norco City staff or private contractors. Costs can also change if implementation occurs simultaneous to other road improvements.These cost estimates are provided in 2023 dollars, and will increase in future years.

Cost estimates for all project recommendations are included in Appendix A.

FACILITY TYPE PER COST
Class I Shared Use Path Mile $1,500,000
Class II Bicycle Lane Mile $132,000
Class IIb Protected Bike Lane Mile $387,000
Class III Bicycle Route Mile $35,000
Rectangular Rapid Flashing Beacon (RRFB) EA $60,000
Pedestrian Refuge Island EA $100,000
High Visibility Crosswalk EA $5,000
Curb Ramps EA $5,000
Curb Extensions EA $50,000
HAWK Signal EA $700,000
Sidewalk Construction SF $25
Pedestrian Lighting MI $260,000
Leading Pedestrian Interval (LPI) EA $50,000
Wayfinding Signs MI $30,000
Stop Warrant EA $5,000
Table 15. Plan Level Cost Estimates (2023)

Page 282 of 628 ends

162
Funding Sources
There are many funding sources available for pedestrian and bicycle infrastructure projects, programs, and studies. The following is a list of potential local, regional, and statewide sources that can be used for building and maintaining pedestrian and bicycle facilities and implementing programming to
encourage the use of active transportation.

Local Grants
Measure R
Measure R, approved by Norco voters in November 2018, is a one-cent sales tax to invest in infrastructure and vital services.

Measure R funds can be used to repair streets, trails, parks, facilities, and equestrian amenities. The Citizens’ Oversight Committee reviews proposed projects and programs to be
funded by Measure R, prioritizes projects and programs, and provides recommendations to the Norco City Council for final approval.

Regional Grants
Measure A
First approved in 1988 and extended in 2002, Measure A is a half-cent sales tax that will fund transportation improvements through 2039. Measure A focuses on reducing current and future congestion by spelling out a list of transportation projects to address the problem. Funds go back to each of three geographic areas within Riverside County: Western Riverside County, Coachella Valley, and Palo Verde Valley, in proportion to the sales taxes they contribute. Each of the three geographic areas has its own transportation program.

Funds are programmed by the Riverside County Transportation Commission (RCTC).

BEYOND Framework Fund Program
The BEYOND launched in 2015 to support member agency
efforts to improve quality of life in Western Riverside County.

Over the two rounds of the Program, $4.1 Million has been awarded to member jurisdictions to support 83 projects. Each of these projects corresponds to at least one of the goals outlined by WRCOG’s Economic Development & Sustainability Framework.

These goals help steer a project’s efforts to enhance local issues as they relate to the economy, education, health, energy and environment, transportation, and water Initiatives.

Funds are programmed by the Western Riverside Council of Governments (WRCOG).

Riverside County Community Improvement Designation (CID) Funds
Each member of the Board of Supervisors has an approved CID allocation to be spent during any given fiscal year. CID funds are intended to augment the efforts of community organizations, non-profits, county departments, and government agencies to benefit residents, neighborhoods and communities in Riverside County. All awards must serve a public purpose and can be used to support programs, capital projects, and fundraising events or activities.

Funds are programmed by the Riverside County Board of
Supervisors.

Page 283 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
163
Sustainable Communities Program (SCP)
The SCP is a technical assistance program that supports its member jurisdictions in planning and non-infrastructure projects that promote safety and encourage people to walk and bike.

Funds can be used for active transportation infrastructure, Safe Routes to School Plans, and quick build projects, and can assist in evaluating the success of new infrastructure and programming.

Funds are programmed by the Southern California Association of Governments (SCAG).

Transportation Development Act (TDA) Article 3
Each year, 2% of the Local Transportation Fund (LTF) revenue is made available for bicycle and pedestrian facility projects under TDA Article 3, also known as SB 821. Eligible projects include sidewalks, access ramps, bicycle facilities, and bicycle plan development. A Call for Projects occurs on a biennial basis, with a release date on the first Monday in February, and funds are allocated each June.

RCTC will release its next call for projects in February 2025.

Transportation Uniform Mitigation Fee Regional Arterial Roads (TUMF)
TUMF regional arterial funds are used for roadway improvement projects and the Community Environmental Transportation Acceptability Process projects. To date, approximately $135 million has been programmed for TUMF regional arterial
projects.

Funds are programmed by RCTC.

State and Federal Grants
Active Transportation Program (ATP)
The State of California’s Active Transportation Program funds projects and programs that increase the proportion of trips made by walking and biking, increase the safety and mobility of non-motorized users, reduce greenhouse gas emissions, and improve public health. Competitive application cycles occur every one to two years, typically in the spring or early summer.

Eligible projects include the construction of bicycling and walking facilities, new or expanded programmatic activities, or projects that include a combination of infrastructure and noninfrastructure components. Typically, no local match is required, though extra points are awarded to applicants who do identify matching funds.

Funds are programmed by the California Transportation
Commission (CTC).

Affordable Housing and Sustainable Communities Program
(AHSC)
The AHSC program funds land-use, housing, transportation, and land preservation projects that support infill and compact development that reduces greenhouse gas emissions. Projects must fall within one of three project area types: transit-oriented development, integrated connectivity project, or rural innovation project areas. Fundable activities include affordable housing developments, sustainable transportation infrastructure, transportation-related amenities, and program costs.

Funds are programmed by the Strategic Growth Council and implemented by the Department of Housing and Community
Development.

Page 284 of 628 ends

164
Highway Safety Improvement Program (HSIP)
Caltrans offers Highway Safety Improvement Program (HSIP) grants every one to two years. Projects on any publicly owned road or active transportation facility are eligible, including bicycle and pedestrian improvements. HSIP focuses on projects that explicitly address documented safety challenges through proven countermeasures, are implementation-ready, and demonstrate cost-effectiveness.

Funds are programmed by Caltrans.

Office of Traffic Safety Grant Program
Under the Fixing America’s Surface Transportation (FAST) Act, 5% of Section 405 funds are dedicated to addressing nonmotorized safety. These funds may be used for law enforcement training related to pedestrian and bicycle safety, enforcement campaigns, equipment projects for non-federally funded
roadways and public education and awareness campaigns.

Funds are programmed by the California Office of Traffic Safety.

Solutions for Congested Corridors (SCCP)
Funded by SB1, the Congested Corridors Program strives to reduce congestion in highly traveled and congested corridors through performance improvements that balance transportation improvements, community impacts, and environmental benefits.

This program can fund a wide array of improvements, including bicycle and pedestrian facilities. Eligible projects must be detailed in an approved corridor-focused planning document.

These projects must include aspects that benefit all modes of transportation using an array of strategies that can change travel behavior, dedicate ROW for bikes and transit, and reduce vehicle miles traveled.

Funds are programmed by Caltrans.

Sustainable Transportation Planning Grant
Caltrans Sustainable Transportation Planning Grants are available to communities for planning, study, and design work to identify and evaluate projects, including conducting outreach or implementing pilot projects. Communities are typically required to provide an 11.47% local match, but staff time or in-kind donations are eligible to be used for the match provided the required documentation is submitted.

Funds are programmed by Caltrans.

Transformative Climate Communities (TCC)
The TCC Program funds development and infrastructure
projects that achieve major environmental, health, and economic benefits in California’s most disadvantaged communities.

TCC empowers the communities most impacted by pollution to choose their own goals, strategies, and projects to reduce greenhouse gas emissions and local air pollution – all with datadriven milestones and measurable outcomes.

Funds are programmed by California’s Cap-and-Trade Program.

Urban Greening Program
Urban Greening Grants support the development of green
infrastructure projects that reduce Greenhouse Gas (GHG) emissions and provide multiple benefits. Projects must include one of three criteria, most relevant: reduce commute vehicle

Page 285 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
165
miles traveled by constructing bicycle paths, bicycle lanes, or pedestrian facilities that provide safe routes for travel between residences, workplaces, commercial centers, and schools.

Eligible projects include green streets and alleyways and nonmotorized urban trails that provide safe routes for travel between residences, workplaces, commercial centers, and schools.

Funds are programmed by the CA Natural Resource Agency.

Page 286 of 628 ends

166
Prioritization
The prioritization framework helps the City understand where to start when implementing this plan. A higher ranked project indicates a higher need based on the metrics described below.

Although a project may be ranked higher, funding may better align with a lower ranked project to hep leverage local money with competitive, regional, state, and federal resources.

The overall project ranking may also change over time as a result of changing transportation patterns, land use patterns, implementation constraints and opportunities, and the
development of other transportation improvements.

Methodology
With limited funding, the City of Norco has to determine how to prioritize the proposed recommendations. Some of these projects can be completed more quickly. For example, projects with community support and minimal trade-offs can be installed as part of the City’s capital improvement funds. Other projects may be more complex and require additional study, or involve multi-jurisdictional coordination. Even if these projects are prioritized as “high priority”, these projects may require the City seeking out additional grant funding opportunities.

The intent of prioritizing projects is to create a strategic list to guide implementation, recognizing budget and staff limitations.

Prioritization results are flexible concepts that serve as guidelines.

Recommended projects were evaluated using five criteria that support the vision and goals of the recommendations. The prioritization process assigns a number between 0 and 6 to all recommendations, based on the criteria outlined in Table 16.

Based on frequency of scores, projects will be sorted into three different tiers with high, medium, and low priority categories. • Tier 1: These projects have the highest potential to
encourage active transportation use. The City of Norco
should focus on these projects for implementation.
• Tier 2: These have lower potential to increase active transportation use, but are still important in the project list. • Tier 3: These projects have the least potential in
increasing active transportation use relative to the other recommendations, however, should still be considered for implementation if funding opportunities arise.

Page 287 of 628 ends

167
Criteria Metric Weight Data Sources
Safety Bicycle and Pedestrian Level of
Traffic Stress
20% Alta
Crash History (Density Weighted
Roadways)
10% Alta, TIMS
Community Health
and Wellness
Relative wellness ranking of Census
block groups within the City of
Norco
5% CalEnviroScreen 4.0, Healthy
Places Inded
Public Support Public comments surrounding
specific roadways and intersections
5% Alta’s Survey and Public Input Map
Connectivity Relative distance to destinations.

The number of destinations within a
half mile buffer of a project
15% Destinations defined as: schools,
libraries, universities, hospitals,
grocery stores, shopping centers,
and parks
Latent Demand Analysis 15% Alta
Transit
Connections
Amount of transit connections
within 1.5 miles of the project
15% Norco Bus Line, Metrolink
Feasibility Planning-level cost estimate of
each project
15% Alta
Table 16. Project Prioritization Criteria

Page 288 of 628 ends

168
Priority Bikeway Projects
The following table shows the prioritized and scored bicycle recommendations. The highest scored project is the Class 2b bike lane on Fifth Street from Corona Avenue to Norconian Drive.

Fifth Street is an important connection, spanning across the I-15 Freeway to link the bicycle networks on the east and west sides of the City, and connects to Neal Snipes Park at Hamner Avenue.

Page 289 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
169
Table 17. Prioritized Bicycle Infrastructure Projects
Street From To Class Total Score Tier
Fifth Street Corona Avenue Norconian Drive Class 2 93 1 Third Street Dead end Valley View Avenue Class 3 90 1
Norco Drive Hamner Avenue River Road Class 2b 86 1
River Road Santa Ana River Main Street Class 2b 84 1
Parkridge Avenue 2nd Street Hamner Avenue Class 2 79 1
Fourth Street Corona Avenue Temescal Avenue Class 3 78 1 Lincoln Avenue Parkridge Avenue Hamner Avenue Class 2 78 1 Fifth Street Class 3 78 1
Hidden Valley Pkwy El Paso Drive City Limit Class 2 74 2 Corona Ave Seventh Street Fourth Street Class 3 71 2
Third Street Valley View Avenue Temescal Avenue Class 3 70 2 Belgian Drive Norco College Dead
End Corydon Avenue Class 3 69 2
Parkridge Avenue/Dales
Drive Second Street Third Street Class 3 69 2
El Paso Drive Hidden Valley Pkwy Temescal Avenue Class 3 69 2 Temescal Avenue Fourth Street First Street Class 3 68 2 First Street Corona Avenue Hillside Avenue Class 3 67 2 Corona Avenue First Street Thoroughbred Lane Class 3 67 2 Thoroughbred Lane Corona Avenue Cut through Class 3 67 2

Page 290 of 628 ends

170
Table 18. Prioritized Bicycle Infrastructure Projects (cont.) Street From To Class Total Score Tier
Third Street Class 1 66 2
Valley View Avenue Third Street Third Street Class 3 65 2 Rock Springs FIrst Street Thoroughbred Lane Class 3 64 2 El Paso Drive Dead end on Harness
Lane
Hidden Valley
Parkway Class 3 64 2
Cut through at park Rock Springs Harness Lane Class 1 61 2 Silver Cloud Drive/
Broken Lance Drive Norco Drive Norconian Drive Class 3 61 2 Norconian Drive Fifth Street Sixth Street Class 2 60 2
Cut through at Hidden
Valley Parkway Thoroughbred Lane Hidden Valley Parkway Class 1 59 2 Eighth Street and
California Avenue Class 3 53 3
River Road Woodward Avenue Pedley Avenue Class 3 51 3
Seventh Street Woodward Avenue Pedley Avenue Class 3 49 3 Pedley Avenue Sixth Street North End Class 3 42 3
Third Street Connector Mountain Avenue

Page 291 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
171
Priority Pedestrian Projects
The following tables provide a scored and prioritized list of pedestrian corridor recommendations and pedestrian spot improvements.

The corridor recommendations include infrastructure such as sidewalks and street lighting, and the spot improvements include intersection treatments like curb extensions, crosswalks, and curb ramps. The highest priority projects are pedestrian improvements at Hamner Avenue. This major arterial is very difficult to cross on foot and providing sidewalks and crosswalks will greatly improve pedestrian safety.

Table 19. Prioritized Pedestrian Corridor Improvement Projects Location Treatment Total Score Tier
Hamner Avenue and Fifth Street, North
Corner Sidewalk 85 1
Hamner Avenue and Fifth Street, South
Corner Sidewalk 83 1
Hamner Avenue and Fifth Street, East
Corner Sidewalk 83 1
Hamner Avenue and Fourth Street Sidewalk 79 1
River Road and Second Street Sidewalk 76 2
Hamner Avenue and Gateway Center Sidewalk 75 2
Hamner Avenue and Hidden Valley
Parkway Sidewalk 73 2
Temescal Avenue and Third Street Sidewalk 73 2
Temescal Avenue and Curtis Drive Street Lighting 73 2
Fifth Street and Corydon Avenue Sidewalk 66 2
Temescal Avenue and Second Street Sidewalk 66 2
Temescal Avenue and First Street Street Lighting 61 3
Norconian Drive Sidewalk 61 3

Page 292 of 628 ends

172
Location Treatment Total Score Tier
River Road and Bluff Street Sidewalk 59 3
Temescal Avenue and Second Street,
North Corner Street Lighting 56 3
Western Avenue Multi-use Path 46 3
Table 20. Prioritized Pedestrian Corridor Improvement Projects (cont.)

Page 293 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
173
Table 21. Prioritized Pedestrian Spot Improvement Projects Street 1 Street 2 Treatment Total Score Tier
Hamner Avenue Lampton Lane High Visibility Crosswalks 83 1 Fourth Street Corona Avenue High Visibility Crosswalks, Curb Ramps 83 1 Fourth Street Valley View Avenue High Visibility Crosswalks 83 1 Fourth Street Temescal Avenue
(western intersection) High Visibility Crosswalks, Curb Ramps 83 1 Hamner Avenue Norco Drive High Visibility Crosswalks, Curb Extensions, Pedestrian Islands 81 1
Fourth Street Temescal Avenue
(eastern intersection) High Visibility Crosswalks, 3-way Stop Signs 81 1 Third Street (mid-block) Hamner Avenue High Visibility Crosswalk (mid-block) 80 1 Temescal Avenue Reservoir Drive High Visibility Crosswalks, Rectangular Rapid Flashing Beacon 78 1
Reservoir Drive Curtis Drive High Visibility Crosswalks, 3-way Stop Signs 75 1 Fifth Street Sierra Avenue High Visibility Crosswalks, Curb Ramps 75 1 Hamner Avenue Fifth Street High Visibility Crosswalks, Curb Extensions 75 1 Hamner Avenue Fourth Street High Visibility Crosswalks, Curb Extensions 74 1 Second Street Western Avenue High Visibility Crosswalks, Curb Ramps 73 1 Second Street Parkridge Avenue High Visibility Crosswalks 73 1 Third Street Corona Avenue High Visibility Crosswalks, Curb Extensions, Curb Ramps 73 1
First Street Hamner Avenue High Visibility Crosswalks, Curb Extensions 72 1 Norco Drive Norconian Drive High Visibility Crosswalks, Curb Extensions, Curb Ramps 71 2

Page 294 of 628 ends

174
Table 22. Prioritized Pedestrian Spot Improvement Projects (cont.) Street 1 Street 2 Treatment Total Score Tier
Sixth Street Valley View Avenue High Visibility Crosswalks, Leading Pedestrian Intervals (LPIs) 71 2
First Street Mountain Avenue High Visibility Crosswalks 70 2 Third Street Hamner Avenue High Visibility Crosswalks, Curb Extensions, Leading Pedestrian Interval 70 2
Second Street Hamner Avenue High Visibility Crosswalks 69 2 Corona Avenue Sears Street High Visibility Crosswalks 69 2 Norco Drive River Ridge Drive High Visibility Crosswalks, Curb Ramps 69 2 Temescal Avenue Third Street High Visibility Crosswalks, 3-way Stop Signs 68 2 Temescal Avenue Curtis Drive High Visibility Crosswalks, HAWK Beacon, Curb Ramps 68 2
Fifth Street Valley View Avenue High Visibility Crosswalks, Curb Ramps 68 2 Sixth Street Corona Avenue High Visibility Crosswalks, Leading Pedestrian Intervals (LPIs) 67 2
Second Street Pacific Avenue High Visibility Crosswalks, Curb Ramps 67 2 Alhambra Street River Ridge Drive High Visibility Crosswalks, curb extensions 66 2 Norco Drive Rocky View Road High Visibility Crosswalks, curb extensions 66 2 Parkridge Avenue Western Avenue High Visibility Crosswalks, Curb Extensions (northwest corner) 65 2
Fifth Street Corona Avenue High Visibility Crosswalks, Curb Ramps 64 2 First Street Parkridge Avenue High Visibility Crosswalks, Curb Extensions 64 2 Third Street Valley View Avenue High Visibility Crosswalks, Curb Ramps 63 2

Page 295 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
175
Table 23. Prioritized Pedestrian Spot Improvement Projects (cont.) Street 1 Street 2 Treatment Total Score Tier
First Street Rock Springs Avenue High Visibility Crosswalks 61 2 Temescal Avenue Second Street High Visibility Crosswalks 59 2 Fifth Street Temescal Avenue High Visibility Crosswalks 59 2 Alhambra Street Rocky View Road High Visibility Crosswalks, curb extensions 59 2 Second Street River Road High Visibility Crosswalks, Curb Extensions, Pedestrian Islands 56 2
Sixth Street California Avenue High Visibility Crosswalks, Leading Pedestrian Intervals (LPIs) 53 3
Sixth Street Center Avenue High Visibility Crosswalks 53 3 Sixth Street Hillside Avenue High Visibility Crosswalks 52 3 Sixth Street Temescal Avenue High Visibility Crosswalks, Leading Pedestrian Intervals (LPIs) 51 3
Seventh Street California Avenue High Visibility Crosswalks, Curb Ramps 48 3 Eighth Street California Avenue High Visibility Crosswalks, Curb Ramps 48 3 Sixth Street Pedley Avenue High Visibility Crosswalks, Leading Pedestrian Intervals (LPIs) 45 3
Sixth Street Crestview Drive High Visibility Crosswalks 42 3 Sixth Street (mid-block) NA High Visibility Crosswalk (mid-block) 42 3 Seventh Street Center Avenue High Visibility Crosswalks, Curb Ramps 41 3 Fifth Street Hillside Avenue High Visibility Crosswalks 41 3 Eighth Street Pedley Avenue High Visibility Crosswalks, 3-way Stop Signs 38 3

Page 296 of 628 ends

176
Table 24. Prioritized Pedestrian Spot Improvement Projects (cont.) Street 1 Street 2 Treatment Total Score Tier
Seventh Street Pedley Avenue High Visibility Crosswalks, Curb Ramps 38 3 Seventh Street Hillside Avenue High Visibility Crosswalks, Curb Ramps 38 3 Fifth Street Pedley Avenue High Visibility Crosswalks, Curb Ramps 33 3 Crestview Drive NA High Visibility Crosswalks 30 3

Page 297 of 628 ends

City of Norco | Appendices
177
This page intentionally left blank

Page 298 of 628 ends

178

APPENDIX A
Project Cost Estimates

Page 299 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
179
Table 25. Bicycle Projects with Planning-level Costs
Name Class Type Miles Upgrade Existing? Start Street End Street Total Cost Corona Avenue 3 Bike Boulevard 1.47 No Seventh Street Fourth Street $16,799.13 Fourth Street 3 Bike Boulevard 0.12 No Corona Avenue Temescal Avenue $1,406.36 Temescal Avenue 3 Bike Boulevard 1.52 No Fourth Street First Street $17,290.69 River Road 2b Bike Lane 2.77 Yes Santa Ana River Main Street $387,337.16 Seventh Street 3 Bike Boulevard 1.14 No Woodward Avenue Pedley Avenue $12,940.18 River Road 3 Bike Boulevard 1.27 No Woodward Avenue Pedley Avenue $14,505.73 Norco Drive 2b Bike Lane 2.68 Yes Hamner Avenue River Road $374,794.84 Pedley Avenue 3 Bike Boulevard 1.12 No Sixth Street North End $12,767.55 Belgian Drive 3 Bike Boulevard 0.66 No Norco College
Dead End Corydon Avenue $7,510.22
Hidden Valley Pkwy 2 Bike Lane 0.44 Yes El Paso Drive City Limit $43,854.53 First Street 3 Bike Boulevard 0.49 No Corona Avenue Hillside Avenue $5,571.53 Rock Springs 3 Bike Boulevard 0.32 No First Street Thoroughbred Lane $3,641.42 Corona Avenue 3 Bike Boulevard 0.24 No First Street Thoroughbred Lane $2,759.93 Thoroughbred Lane 3 Bike Boulevard 0.68 No Corona Avenue Cut through $7,788.65 Cut through at Hidden
Valley Parkway
1 Bike Path 0.05 Yes Thoroughbred
Lane Hidden Valley Pkwy $73,429.54
Cut through at park 1 Bike Path 0.09 Yes Rock Springs Ave Harness Lane $135,208.51 El Paso Drive 3 Bike Boulevard 0.47 No
Dead end on
Harness Lane Hidden Valley Pkwy $5,319.88
Third Street 3 Bike Boulevard 0.95 No Dead end Valley View Avenue $10,830.29 Valley View Avenue 3 Bike Boulevard 0.12 No Third Street Third Street $1,380.18

Page 300 of 628 ends

180
Name Class Type Miles Upgrade Existing? Start Street End Street Total Cost Third Street 3 Bike Boulevard 0.45 No Valley View Avenue Temescal Avenue $5,162.97 Parkridge Avenue 2 Bike Lane 1.26 No Second Street Hamner Avenue $125,651.83 Lincoln Avenue 2 Bike Lane 0.52 No Parkridge Avenue Hamner Avenue $51,563.94 Fifth Street 2 Bike Lane 0.52 No Corona Avenue Norconian Drive $51,577.31 Norconian Drive 2 Bike Lane 0.48 No Fifth Street Sixth Street $48,394.77 Parkridge Avenue/Dales
Drive
3 Bike Boulevard 0.89 No Second Street Third Street $10,143.64 Silver Cloud Drive/
Broken Lance Drive
3 Bike Boulevard 0.82 No Norco Drive Norconian Drive $9,371.32 Connector 1 Bike Path 0.04 No $58,281.53
Eighth Street and
California Avenue
3 Bike Boulevard 0.81 No $9,228.68
El Paso Drive 3 Bike Boulevard 1.30 No Hidden Valley
Parkway
Temescal Avenue $14,827.44
Fifth Street 3 Bike Boulevard 0.61 No $6,979.93
Table 26. Bicycle Projects with Planning-level Costs (cont.)

Page 301 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
181
Street 1 Street 2 Treatment Total Cost
Alhambra Street River Ridge Drive High Visibility Crosswalks, Curb Extensions $220,000.00 Alhambra Street Rocky View Road High Visibility Crosswalks, Curb Extensions $115,000.00 Corona Avenue Sears Street High Visibility Crosswalks $5,000.00 Crestview Drive NA High Visibility Crosswalks $5,000.00 Eighth Street Pedley Avenue High Visibility Crosswalks, 3-way Stop Signs $20,000.00 Eighth Street California Avenue High Visibility Crosswalks, Curb Ramps $40,000.00 Fifth Street Corona Avenue High Visibility Crosswalks, Curb Ramps $40,000.00 Fifth Street Valley View Avenue High Visibility Crosswalks, Curb Ramps $40,000.00 Fifth Street Sierra Avenue High Visibility Crosswalks, Curb Ramps $40,000.00 Fifth Street Pedley Avenue High Visibility Crosswalks, Curb Ramps $40,000.00 Fifth Street Hillside Avenue High Visibility Crosswalks $20,000.00 Fifth Street Temescal Avenue High Visibility Crosswalks $20,000.00 First Street Rock Springs Avenue High Visibility Crosswalks $15,000.00 First Street Parkridge Avenue High Visibility Crosswalks, Curb Extensions $220,000.00 First Street Mountain Avenue High Visibility Crosswalks $20,000.00 First Street Hamner Avenue High Visibility Crosswalks, Curb Extensions $120,000.00 Fourth Street Temescal Avenue (eastern
intersection) High Visibility Crosswalks, 3-way Stop Signs $20,000.00 Fourth Street Corona Avenue High Visibility Crosswalks, Curb Ramps $25,000.00 Fourth Street Valley View Avenue High Visibility Crosswalks $20,000.00 Table 27. Pedestrian Spot Projects with Planning-level Costs

Page 302 of 628 ends

182
Street 1 Street 2 Treatment Total Cost
Fourth Street
Temescal Avenue (western
intersection)
High Visibility Crosswalks, Curb Ramps $15,000.00
Hamner Avenue Lampton Lane High Visibility Crosswalks $5,000.00 Hamner Avenue Norco Drive High Visibility Crosswalks, Curb Extensions, Pedestrian Islands $420,000.00 Hamner Avenue Fifth Street High Visibility Crosswalks, Curb Extensions $225,000.00 Hamner Avenue Fourth Street High Visibility Crosswalks, Curb Extensions $220,000.00 Norco Drive Norconian Drive High Visibility Crosswalks, Curb Extensions, Curb Ramps $230,000.00 Norco Drive Rocky View Road High Visibility Crosswalks, Curb Extensions $110,000.00 Norco Drive River Ridge Drive High Visibility Crosswalks, Curb Ramps $25,000.00 Parkridge Avenue Western Avenue High Visibility Crosswalks, Curb Extensions (northwest corner) $65,000.00 Reservoir Drive Curtis Drive High Visibility Crosswalks, 3-way Stop Signs $20,000.00 Second Street Hamner Avenue High Visibility Crosswalks $20,000.00 Second Street Pacific Avenue High Visibility Crosswalks, Curb Ramps $40,000.00 Second Street Western Avenue High Visibility Crosswalks, Curb Ramps $40,000.00 Second Street Parkridge Avenue High Visibility Crosswalks $15,000.00 Second Street River Road High Visibility Crosswalks, Curb Extensions, Pedestrian Islands $420,000.00 Seventh Street Pedley Avenue High Visibility Crosswalks, Curb Ramps $40,000.00 Seventh Street Center Avenue High Visibility Crosswalks, Curb Ramps $40,000.00 Seventh Street California Avenue High Visibility Crosswalks, Curb Ramps $40,000.00 Seventh Street Hillside Avenue High Visibility Crosswalks, Curb Ramps $40,000.00 Table 28. Pedestrian Spot Projects with Planning-level Costs (cont.)

Page 303 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
183
Street 1 Street 2 Treatment Total Cost
Sixth Street Corona Avenue High Visibility Crosswalks, Leading Pedestrian Intervals (LPIs) $220,000.00 Sixth Street Pedley Avenue High Visibility Crosswalks, Leading Pedestrian Intervals (LPIs) $220,000.00 Sixth Street California Avenue High Visibility Crosswalks, Leading Pedestrian Intervals (LPIs) $220,000.00 Sixth Street Crestview Drive High Visibility Crosswalks $20,000.00 Sixth Street Center Avenue High Visibility Crosswalks $10,000.00 Sixth Street Temescal Avenue High Visibility Crosswalks, Leading Pedestrian Intervals (LPIs) $220,000.00 Sixth Street Hillside Avenue High Visibility Crosswalks $20,000.00 Sixth Street Valley View Avenue High Visibility Crosswalks, Leading Pedestrian Intervals (LPIs) $220,000.00 Sixth Street (mid-block) NA High Visibility Crosswalk (mid-block) $5,000.00 Temescal Avenue Second Street High Visibility Crosswalks $20,000.00 Temescal Avenue Third Street High Visibility Crosswalks, 3-way Stop Signs $20,000.00 Temescal Avenue Curtis Drive High Visibility Crosswalks, HAWK Beacon, Curb Ramps $725,000.00 Temescal Avenue Reservoir Drive High Visibility Crosswalks, Rectangular Rapid Flashing Beacon $70,000.00 Third Street Valley View Avenue High Visibility Crosswalks, Curb Ramps $40,000.00 Third Street Hamner Avenue High Visibility Crosswalks, Curb Extensions, Leading Pedestrian Interval $420,000.00 Third Street Corona Avenue High Visibility Crosswalks, Curb Extensions, Curb Ramps $90,000.00 Third Street (mid-block) Hamner Avenue High Visibility Crosswalk (mid-block) $5,000.00 Table 29. Pedestrian Spot Projects with Planning-level Costs (cont.)

Page 304 of 628 ends

184
Street From To Treatment Total Cost
Hidden Valley Parkway Hamner Avenue I-15 Freeway Off-ramp Sidewalk $1,317.10 Hamner Avenue Chapparel Center Neal Snipes Park Sidewalk $20,212.80 Hamner Avenue Fifth Street South of intersection Sidewalk $8,388.04 Hamner Avenue Norco’s Best Burgers Citibank Sidewalk $12,536.07 Hamner Avenue Gateway Center Drive Hidden Valley Parkway Sidewalk $11,718.62 River Road Norco/Corona Boundary Second Street Sidewalk $31,482.90 River Road Sundance Lane Bluff Street Sidewalk $27,167.18 Fifth Street Hamner Avenue Horseless Carriage Drive Sidewalk $36,110.40 Fifth Street Norconian Drive Norco Drive Sidewalk $121,542.39 Temescal Avenue Norco Intermediate School Norco High School Sidewalk $37,410.19 Temescal Avenue Norco High School Norco Elementary School Sidewalk $28,775.25 Norconian Drive Norco Drive Fifth Street Sidewalk $67,862.85 Western Avenue Appaloosa Street Shearer Park Multi-use Path $704,020.09 Temescal Avenue
Start of Norco Elementary
School school zone
End of Norco Elementary
School school zone
Street Lighting1 $107,608.72
Temescal Avenue
Start of Norco High School
school zone
End of Norco High School
school zone
Street Lighting $106,046.98
Temescal Avenue
Start of Norco
Intermediate School
school zone
End of Norco Intermediate
School school zone
Street Lighting $110,230.92
Table 30. Pedestrian Corridor Projects with Planning-level Costs

Page 305 of 628 ends

City of Norco | Pedestrian and Bicycle Master Plan
185
This page intentionally left blank

Page 306 of 628 ends

186
City of Norco Active Transportation Plan

Page 307 of 628 ends

City Council

STAFF REPORT
Date: April 17, 2024 Agenda Item:

3.I.

To: Honorable Mayor and City Council Members
From: Amanda Hamilton, Facilities and Maintenance
Director
Prepared By: Amanda Hamilton, Facilities and Maintenance Director
Department: Facilities and Maintenance
SUBJECT:

Acceptance of the Wayne Makin LED Lighting Upgrade Project as Complete RECOMMENDATION:

Accept the Wayne Makin LED Lighting Upgrade Project as complete and authorize the City Clerk to file a Notice of Completion with the County of Riverside.

SUMMARY:

The scope of work for the Wayne Makin LED Lighting Upgrade Project included the replacement of all sports field lighting, security lighting, and parking lot lighting at the Complex. On February 15, 2023, the City Council approved a contract with Musco Sports Lighting, LLC for the procurement of materials for the project. On September 18, 2023, the City Council awarded a separate contract with F.E.C. Electric for the installation of the Musco equipment. This project was completed in January 2024 and is found to be in full conformance with the plans and specifications on the contract documents.

BACKGROUND:

On September 18, 2023, the City Council awarded a contract to F.E.C. Electric, Inc. for the Wayne Makin LED Lighting Upgrade Project in the amount of $669,000 with City Manager approval for change orders up to 10% of the original contract amount for a total project installation cost of $735,900. F.E.C. Electric, Inc. completed their scope of work for the project at a total cost of $728,448 due to six change orders totaling $59,445.

The change orders included the following unforeseen work:

Change Scope of Work Cost

Page 308 of 628 ends

Order
CO1 Retrofit P21 Cell Tower to New LED
Musco Fixtures. 3 New Fixtures. $18,214
CO2 Add Switchgear Enclosure $5,000
CO3 Relocate Existing Disconnect From
Wood Pole at LL Snack Bar $14,697
CO4 Relocate 5 Plugs from Wood Poles to
New Musco Pole Location $6,964
CO5 Paint Existing Switch Gear to Match
New Pull Sections for Musco Cabinets $6,165
CO6
Existing 120v Wiring - Not Code
Compliant. Remove and Replace
Conduit Along Lids and Add a New
Vault for the Electrical System
$8,405
Total $59,445
The new lighting system at the Wayne Makin Sports Complex was scheduled around Norco's youth sports leagues programs in a two phased approach that began on Shearer Field on October 19, 2023. The project was finalized on January 10, 2024 and Musco conducted a series of light tests to ensure optimal field lighting. In addition, the new lighting system is anticipated to provide up to 10% or more in energy savings and addressed the safety hazards associated with the previous wooden poles.

The new system not only includes new lighting but also a control system in which staff can monitor usage, set lighting schedules, monitor the system for errors, and adjust the lights remotely. The pictures shown below were taken in January just after the lighting project was completed by F.E.C. Electric, Inc.

Page 309 of 628 ends

Musco Sports Lighting provided the attached Lighting and Operations Maintenance Manual that includes the warranty, service contacts, lighting design, control monitoring, and information drawings as a complete submittal package for the project.

The work at the Wayne Makin Sports Complex has been inspected by not only the Building Inspector but Musco Sports Lighting, and found to be in full conformance with the plans and specifications on the contract documents. Staff is recommending that the

Page 310 of 628 ends

City Council accept the work performed by F.E.C. Electric, Inc. as complete, and authorize the City Clerk to record the Notice of Completion with the County Recorder’s Office.

The Wayne Makin LED Lighting Upgrade Project was approved as a Capital Improvement Project (CIP) in the Measure R Fund for Fiscal Year 2022-23. $2,500,000 in Measure R Funds were appropriated in account 132.930.43130 for the Wayne Makin LED Lighting Upgrade Project, Project No. 54111.4.

The cost for the project including the procurement of the Musco Sports Field Lighting materials and installation is $2,381,448.

FISCAL IMPACT:

There is no fiscal impact for this item.

RELATIONSHIP TO STRATEGIC PLAN:

This item is consistent with Strategic Direction No. 5 Infrastructure and Asset Management: Ensure timely preservation, replacement, improvement and acquisition of infrastructure and capital assets.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Lisette Free, Finance Director Approved by: Lori Sassoon, City Manager
Approved as to Form: Harper and Burns, LLC, City Attorney ATTACHMENT(S):

WM_Musco Complete Submittal Package

Page 311 of 628 ends

MUSCO LIGHTING OPERATIONS & MAINTENANCE MANUAL
PREPARED FOR:

Wayne Makin Shearer Sports Complex
Lighting Project
Norco, CA
February 26, 2024
Project #142916
Submitted by:

Musco Sports Lighting, LLC
Attn: Taylor Knoot
100 1st Ave
PO Box 808
Oskaloosa, Iowa 52577
Toll Free: 800-825-6020
Fax: 641-673-4852
This information Is provided by Musco exclusively For this project. Reproduction or distribution of the enclosed documents or information withough the written permission of Musco Sports Lighting, LLC is prohibited. M-1164-enUS-5 Page 312 of 628

TABLE OF CONTENTS
Wayne Makin Shearer Sports Complex Page 313 of 628
Operations & Maintenance Manual: Table of Contents
A. WARRANTY
B. SERVICE CONTACTS
C. LIGHTING DESIGN
D. CONTROLS AND MONITORING
E. AIMING INFORMATION/DRAWINGS
Wayne Makin Shearer Sports Complex, 142916 Page 314 of 628 A. WARRANTY
Wayne Makin Shearer Sports Complex, 142916 Page 315 of 628 ©2005, 2019 Musco Sports Lighting, LLC · M-1297-enUS-7
- Page 1 of 2 -
Project name:_______________________________________________________________ Project number:________________ Owner:___________________________________________________ City:___________________________ State:___________ Covered product(s):_________________________________________________________________________________________ Date issued:__________________________________________ Expiration:___________________________________________ Musco Sports Lighting, LLC will provide all materials and labor to maintain operation of your lighting system to original design criteria for 10 years. Musco products and services are guaranteed to perform on your project as detailed in this document.

Light Performance
Specified illumination levels will be maintained and are marked as guaranteed in the Musco Illumination Summary.

Individual luminaire outages that occur during the warranty and maintenance period are repaired when the usage of any field is materially impacted.

Spill Light Control
If specified, spill light levels at identified locations are guaranteed to be controlled to the maximum values provided in the Musco Illumination Summary.

Energy Consumption
Total average kW consumption for your lighting system is guaranteed to be not more than the total load shown in the Musco Illumination Summary.

Monitoring, Maintenance, and Control Services
Musco shall monitor the performance of your lighting system, including on/off status, hours of usage, and luminaire outages. If outages that affect playability are detected, Musco will contact you and proactively dispatch technicians.

On-off control of your lighting system is provided via an easy-to-use web site scheduling system, smartphone app, phone, email, or fax. Our trained Control-Link Central™ service center staff is available toll-free 24/7. Regular usage reports are always available on Control-Link Central’s web site.

Structural Integrity
Your project has been designed to __________________________________________________________________ .

Structural integrity of equipment manufactured by Musco is guaranteed.

Musco has a team to ensure fulfillment of our product and services warranty and maintains financial reserves dedicated to support our fulfillment of this warranty. Please keep this document as your signed contract guaranteeing comprehensive service for the 10 year period. 10-Year Product Assurance & Warranty Program
Wayne Makin Shearer Sports Complex 142916 City of Norco Norco CA December 19, 2023 December 19, 2033 CBC, 2019, 95 mph, Exposure C SportsCluster ™ System with TLC for LED™ technology

Page 316 of 628 ends

©2005, 2019 Musco Sports Lighting, LLC · M-1297-enUS-7
- Page 2 of 2 -
Terms and Conditions
10-Year Product Assurance & Warranty Program
Service under this Contract is provided by Musco Sports Lighting, LLC (“Musco”) or an authorized servicer approved by Musco. Services performed under this Contract shall consist of furnishing labor and parts necessary to restore the operation of the Covered Product(s) to original design criteria provided such service is necessitated by failure of the Covered Product(s) during normal usage. This Contract covers Product(s) consisting of Musco’s Total Light Control – TLC for LED® with Control-Link® and any additional Musco manufactured product as listed on page 1.
“We”, “us,” and “our” mean Musco. “You” and “your” mean the purchaser of the Covered Product(s). No one has the authority to change this Contract without the prior written approval of Musco. Musco shall not assume responsibility for their agents or assignees other than as described below. If there is a conflict between the terms of this Contract and information communicated either orally or in writing by one or more of our employees or agents, this Contract shall control.

Additional Provisions

1. Availability of Service: Control-Link Central™ operators shall be available 24/7 via web site, phone, fax, or email. Maintenance service specialists shall be available 8AM to 5PM Central Time, and services shall be rendered during these same hours in your local time zone, Monday through Friday (with the exception of national holidays). Hours of operation are subject to change without notice to you. Musco will exercise all reasonable efforts to perform service under this Contract, but will not be responsible for delays or failure in performing such services caused by adverse weather conditions, acts of any government, failure of transportation, accidents, riots, war, labor actions or strikes or other causes beyond its control.

2. Determination of Repairs: Musco will utilize the field monitoring system and any information provided by the customer to determine when the usage of the field is materially impacted. From this information, Musco will determine needed repair and/or replacement of Covered Product(s) and parts. Repair will be with Product(s) of like kind and quality.

3. Your Requirements Under this Contract: You must meet all electrical and installation requirements as specified by the manufacturer. In addition, you promise and assure: full cooperation with Musco, Musco’s technicians and authorized servicers during telephone diagnosis and repair of the Covered Product(s); reasonable accessibility of the Covered Product(s); a nonthreatening and safe environment for service.

You agree to check fuses and to replace fuses as needed. Musco provides spare fuses in the lowest alpha-numeric numbered enclosure.

Musco will replenish spare fuses used.

You agree to keep your control system online. This means keeping the required control voltage to the control system at all times. Any deviation from this practice must be discussed with Musco’s Warranty Department.

4. Service Limitations — This Contract does not cover: Maintenance, repair, or replacement necessitated by loss or damage resulting from any external causes such as, but not limited to, theft, environmental conditions, negligence, misuse, abuse, improper electrical/power supply, unauthorized repairs by third parties, attachments, damage to cabinetry, equipment modifications, vandalism, animal or insect infestation, physical damage to Covered Product(s) parts or components, failure of existing structures, supporting electrical systems or any non-Musco equipment, or acts of nature (including, but not limited to: earthquake, flood, tornadoes, typhoons, hurricanes, or lightning).

5. Contract Limitations:
a. EXCLUSIONS FROM COVERAGE: IN NO EVENT WILL MUSCO

BE LIABLE FOR ANY SPECIAL, INDIRECT, INCIDENTAL, OR

CONSEQUENTIAL DAMAGES WHICH INCLUDE, BUT ARE NOT

LIMITED TO, ANY DELAY IN RENDERING SERVICE OR LOSS

OF USE DURING THE REPAIR PERIOD OF THE COVERED
PRODUCT(S) OR WHILE OTHERWISE AWAITING PARTS.
b. LIMITATION OF LIABILITY: To the extent permitted by applicable law, the liability of Musco, if any, for any allegedly defective Covered Product(s) or components shall be limited to repair or replacement of the Covered Product(s) or components at Musco’s option. THIS CONTRACT IS YOUR SOLE EXPRESS WARRANTY
WITH RESPECT TO THE COVERED PRODUCT(S). ALL IMPLIED

WARRANTIES WITH RESPECT TO THE COVERED PRODUCT(S)

INCLUDING, BUT NOT LIMITED TO, IMPLIED WARRANTIES

OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR
PURPOSE, ARE HEREBY EXPRESSLY EXCLUDED.
c. For the purposes of and by your acceptance of this Contract you acknowledge and agree that if a surety bond (“Bond”) is provided the warranty and/or maintenance guarantee provided for in this Contract and any corresponding liability on behalf of the issuing surety under the Bond is limited to the first twelve (12) months of said warranty and/or maintenance guarantee coverage period. Any warranty and/ or guarantee coverage period in excess of said initial 12 month period does not fall within the scope of the Bond and shall be the sole responsibility of Musco.
d. Musco requires reasonable access for a crane or man lift equipment to service the lighting system. Musco will not be responsible for damage from operating the vehicle on the property when the equipment is operated in the prescribed manner over the designated access route.
e. Obsolescence or Environmental Restrictions: If during any maintenance or other work performed under this Warranty, any of the parts of the Covered Product(s) are found to be either obsolete, no longer available, or prohibited by any state of federal agency, Musco shall replace said parts with comparable parts and materials with equal operating characteristics solely at Musco’s discretion. The cost of replacement of any obsolete cellular related technology shall be borne by you. Prior to completing any such work, Musco shall notify you of the cost (if any) you will incur in the replacement of such parts under this section.

6. Transfer and Assignment: Except to owners, you shall not have the right to assign or otherwise transfer your rights and obligations under this Contract except with the prior written consent of Musco; however, a successor in interest by merger, operation of law, assignment or purchase or otherwise of your entire business shall acquire all of your interests under this Contract.

7. Governing Law: The Contract shall be interpreted and enforced according to the laws of the project location.

8. Subrogation: In the event Musco repairs or replaces any Covered Product(s), parts or components due to any defect for which the manufacturer or its agents or suppliers may be legally responsible, you agree to assign your rights of recovery to Musco. You will be reimbursed for any reasonable costs and expenses you may incur in connection with the assignment of your rights. You will be made whole before Musco retains any amounts it may recover.

Signature: ___________________________________________
Vice President of Sales

Page 317 of 628 ends

25-Year Product Assurance & Warranty Program
™
©2005, 2019 Musco Sports Lighting, LLC M-1291-enUS-11
- Page 1 of 2 -
Project name:_______________________________________________________________ Project number:________________ Owner:___________________________________________________ City:___________________________ State:___________ Covered product(s):_________________________________________________________________________________________ Date issued:__________________________________________ Expiration:___________________________________________ Musco Sports Lighting, LLC will provide all materials and labor to maintain operation of your lighting system to original design criteria for 25 years. Musco products and services are guaranteed to perform on your project as detailed in this document.

Light Performance
Specified illumination levels will be maintained and are marked as guaranteed in the Musco Illumination Summary.

Individual luminaire outages that occur during the warranty and maintenance period are repaired when the usage of any field is materially impacted.

Spill Light Control
If specified, spill light levels at identified locations are guaranteed to be controlled to the maximum values provided in the Musco Illumination Summary.

Energy Consumption
Total average kW consumption for your lighting system is guaranteed to be not more than the total load shown in the Musco Illumination Summary.

Monitoring, Maintenance, and Control Services
Musco shall monitor the performance of your lighting system, including on/off status, hours of usage, and luminaire outages. If outages that affect playability are detected, Musco will contact you and proactively dispatch technicians.

On-off control of your lighting system is provided via an easy-to-use web site scheduling system, smartphone app, phone, email, or fax. Our trained Control-Link Central™ service center staff is available toll-free 24/7. Regular usage reports are always available on Control-Link Central’s web site.

Structural Integrity
Your project has been designed to __________________________________________________________________ .

Structural integrity of equipment manufactured by Musco is guaranteed.

Musco has a team of people to ensure fulfillment of our product and services warranty and maintains financial reserves dedicated to support our fulfillment of this warranty. Please keep this document as your signed contract guaranteeing comprehensive service for the 25 year period.

Wayne Makin Shearer Sports Complex 142916 City of Norco Norco CA December 19, 2023 December 19, 2048 CBC, 2019, 95 mph, Exposure C Light-Structure System™ with TLC for LED™ technology

Page 318 of 628 ends

25-Year Product Assurance & Warranty Program
™
©2005, 2019 Musco Sports Lighting, LLC M-1291-enUS-11
- Page 2 of 2 -
Terms and Conditions
Service under this Contract is provided by Musco Sports Lighting, LLC (“Musco”) or an authorized servicer approved by Musco. Services performed under this Contract shall consist of furnishing labor and parts necessary to restore the operation of the Covered Product(s) to original design criteria provided such service is necessitated by failure of the Covered Product(s) during normal usage. This Contract covers Product(s) consisting of Musco’s Total Light Control – TLC for LED® with Control‑Link® and any additional Musco manufactured product as listed on page 1. “We”, “us,” and “our” mean Musco. “You” and “your” mean the purchaser of the Covered Product(s). No one has the authority to change this Contract without the prior written approval of Musco. Musco shall not assume responsibility for their agents or assignees other than as described below. If there is a conflict between the terms of this Contract and information communicated either orally or in writing by one or more of our employees or agents, this Contract shall control.

Additional Provisions

1. Availability of Service: Control-Link Central™ operators shall be available 24/7 via web site, phone, fax, or email. Maintenance service specialists shall be available 8AM to 5PM Central Time, and services shall be rendered during these same hours in your local time zone, Monday through Friday (with the exception of national holidays). Hours of operation are subject to change without notice to you. Musco will exercise all reasonable efforts to perform service under this Contract, but will not be responsible for delays or failure in performing such services caused by adverse weather conditions, acts of any government, failure of transportation, accidents, riots, war, labor actions or strikes or other causes beyond its control.

2. Determination of Repairs: Musco will utilize the field monitoring system and any information provided by the customer to determine when the usage of the field is materially impacted. From this information, Musco will determine needed repair and/or replacement of Covered Product(s) and parts. Repair will be with Product(s) of like kind and quality.

3. Your Requirements Under this Contract: You must meet all electrical and installation requirements as specified by the manufacturer. In addition, you promise and assure: full cooperation with Musco, Musco’s technicians and authorized servicers during telephone diagnosis and repair of the Covered Product(s); reasonable accessibility of the Covered Product(s); a nonthreatening and safe environment for service.

You agree to check fuses and to replace fuses as needed. Musco provides spare fuses in the lowest alpha-numeric numbered enclosure. Musco will replenish spare fuses used.

You agree to keep your control system online. This means keeping the required control voltage to the control system at all times. Any deviation from this practice must be discussed with Musco’s Warranty Department.

4. Service Limitations — This Contract does not cover: Maintenance, repair, or replacement necessitated by loss or damage resulting from any external causes such as, but not limited to, theft, environmental conditions, negligence, misuse, abuse, improper electrical/power supply, unauthorized repairs by third parties, attachments, damage to cabinetry, equipment modifications, vandalism, animal or insect infestation, physical damage to Covered Product(s) parts or components, failure of existing structures, supporting electrical systems or any non-Musco equipment, or acts of God/nature (including, but not limited to:
earthquake, flood, tornadoes, typhoons, hurricanes, or lightning).

5. Contract Limitations:
a. EXCLUSIONS FROM COVERAGE: IN NO EVENT WILL MUSCO BE LIABLE

FOR ANY SPECIAL, INDIRECT, INCIDENTAL OR CONSEQUENTIAL

DAMAGES WHICH INCLUDE, BUT ARE NOT LIMITED TO, ANY DELAY IN

RENDERING SERVICE OR LOSS OF USE DURING THE REPAIR PERIOD

OF THE COVERED PRODUCT(S) OR WHILE OTHERWISE AWAITING
PARTS.
b. Limitation of Liability: To the extent permitted by applicable law, the liability of Musco, if any, for any allegedly defective Covered Product(s) or components shall be limited to repair or replacement of the Covered Product(s) or components at Musco’s option. THIS CONTRACT IS YOUR

SOLE EXPRESS WARRANTY WITH RESPECT TO THE COVERED
PRODUCT(S). ALL IMPLIED WARRANTIES WITH RESPECT TO

THE COVERED PRODUCT(S) INCLUDING, BUT NOT LIMITED TO,

IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, ARE HEREBY EXPRESSLY EXCLUDED.
c. For the purposes of and by your acceptance of this Contract you acknowledge and agree that if a surety bond (“Bond”) is provided the warranty and/or maintenance guarantee provided for in this Contract and any corresponding liability on behalf of the issuing surety under the Bond is limited to the first twelve (12) months of said warranty and/or maintenance guarantee coverage period. Any warranty and/or guarantee coverage period in excess of said initial 12 month period does not fall within the scope of the Bond and shall be the sole responsibility of Musco.
d. Musco requires reasonable access for a crane or man lift equipment to service the lighting system. Musco will not be responsible for damage from operating the vehicle on the property when the equipment is operated in the prescribed manner over the designated access route.
e. Obsolescence or Environmental Restrictions: If during any maintenance or other work performed under this Warranty, any of the parts of the Covered Product(s) are found to be either obsolete, no longer available, or prohibited by any state of federal agency, Musco shall replace said parts with comparable parts and materials with equal operating characteristics solely at Musco’s discretion. The cost of replacement of any obsolete cellular related technology shall be borne by you. Prior to completing any such work, Musco shall notify you of the cost (if any) you will incur in the replacement of such parts under this section.

6. Transfer and Assignment: Except to owners, you shall not have the right to assign or otherwise transfer your rights and obligations under this Contract except with the prior written consent of Musco; however, a successor in interest by merger, operation of law, assignment or purchase or otherwise of your entire business shall acquire all of your interests under this Contract.

7. Governing Law: Unless otherwise governed by applicable state law, the Contract shall be interpreted and enforced according to the laws of the State of Iowa.

8. Subrogation: In the event Musco repairs or replaces any Covered Product(s), parts or components due to any defect for which the manufacturer or its agents or suppliers may be legally responsible, you agree to assign your rights of recovery to Musco. You will be reimbursed for any reasonable costs and expenses you may incur in connection with the assignment of your rights. You will be made whole before Musco retains any amounts it may recover.

Signature: ___________________________________________
Vice President of Sales

Page 319 of 628 ends

B. SERVICE CONTACTS
Wayne Makin Shearer Sports Complex, 142916 Page 320 of 628 Musco Sports Lighting, LLC 2017 M-2301-enUS-2
Operations & Maintenance Manual: Service Contacts Warranty & Controls Warranty Department or Service and Parts Sales
Musco Sports Lighting, LLC
100 1st Avenue West
PO Box 808
Oskaloosa, IA 52577
Phone: 877-347-3319
Fax: 800-853-8847
www.musco.com
Control-Link Central™
www.control-link.com
Phone: 877-347-3319
Fax: 800-853-8847
Email: [email protected]

Page 321 of 628 ends

C. LIGHTING DESIGN
Wayne Makin Shearer Sports Complex, 142916 Page 322 of 628

PROJECT SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 Ligh Ɵng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC.

Wayne Makin Shearer Sports Complex
Norco, CA
Lighting System
Pole/Fixture Summary
Pole ID Pole Height Mtg Height Fixture Qty Luminaire Type Load Circuit A1 70' 70'4 TLC-LED-1200 4.68 kWA
20'1 Cree OSQ 0.10 kWN
16'1 TLC-BT-575 0.57 kWA
A2 70' 70'2 TLC-LED-400 0.80 kWM
70'4 TLC-LED-1200 4.68 kWA
16'1 TLC-BT-575 0.57 kWA
A3-A4 60' 60'1 TLC-LED-1200 1.17 kWB
60'2 TLC-LED-900 1.78 kWB
20'1 Cree OSQ 0.10 kWN
16'1 TLC-BT-575 0.57 kWB
A5 60' 60'1 TLC-LED-900 0.89 kWC
60'1 TLC-LED-900 0.89 kWD
60'2 TLC-LED-1200 2.34 kWC
60'2 TLC-LED-1200 2.34 kWD
20'2 Cree OSQ 0.21 kWN
16'1 TLC-BT-575 0.57 kWC
16'1 TLC-BT-575 0.57 kWD
A6 60' 60'1 TLC-LED-900 0.89 kWC
60'2 TLC-LED-1200 2.34 kWC
20'1 Cree OSQ 0.10 kWN
16'1 TLC-BT-575 0.57 kWC
A7 60' 60'2 TLC-LED-1200 2.34 kWD
60'1 TLC-LED-900 0.89 kWD
20'1 Cree OSQ 0.10 kWN
16'1 TLC-BT-575 0.57 kWD
A8 60' 60'3 TLC-LED-900 2.67 kWL
A9 60' 60'2 TLC-LED-1200 2.34 kWE
60'1 TLC-LED-900 0.89 kWE
20'1 Cree OSQ 0.10 kWN
16'1 TLC-BT-575 0.57 kWE
A10 60' 60'2 TLC-LED-1200 2.34 kWE
60'3 TLC-LED-900 2.67 kWL
60'1 TLC-LED-900 0.89 kWE
20'1 Cree OSQ 0.10 kWN
16'1 TLC-BT-575 0.57 kWE
B1 80' 80'7 TLC-LED-1500 10.01 kWA
16'1 TLC-BT-575 0.57 kWA
B2 80' 80'7 TLC-LED-1500 10.01 kWA
80'2 TLC-LED-400 0.80 kWM
16'1 TLC-BT-575 0.57 kWA
B3 70' 70'4 TLC-LED-1500 5.72 kWC
70'4 TLC-LED-1500 5.72 kWB
20'1 Cree OSQ 0.10 kWN
16'1 TLC-BT-575 0.57 kWB
16'1 TLC-BT-575 0.57 kWC
B4 70' 70'3 TLC-LED-1200 3.51 kW I
70'4 TLC-LED-1500 5.72 kWB
20'1 Cree OSQ 0.10 kWN
16'1 TLC-BT-575 0.57 kWB
B5 70' 70'4 TLC-LED-1500 5.72 kWC
16'1 TLC-BT-575 0.57 kWC
B6 70' 70'4 TLC-LED-1500 5.72 kWD
20'1 Cree OSQ 0.10 kWN
16'1 TLC-BT-575 0.57 kWD
B7 70' 70'4 TLC-LED-1500 5.72 kWD
70'4 TLC-LED-1500 5.72 kWE
20'1 Cree OSQ 0.10 kWN
16'1 TLC-BT-575 0.57 kWD
16'1 TLC-BT-575 0.57 kWE
B8 70' 70'4 TLC-LED-1500 5.72 kWE
20'1 Cree OSQ 0.10 kWN
16'1 TLC-BT-575 0.57 kWE
B9 60' 60'3 TLC-LED-1200 3.51 kWL
16'1 TLC-BT-575 0.57 kWL
B10 60' 60'3 TLC-LED-1200 3.51 kWL
40'2 TLC-LED-400 0.80 kWM
16'1 TLC-BT-575 0.57 kWL
C1 70' 70'5 TLC-LED-1200 5.85 kWF
70'5 TLC-LED-1500 7.15 kWA
16'2 TLC-BT-575 1.15 kWA
CTC2 80' 80'5 TLC-LED-1500 7.15 kWA
16'2 TLC-BT-575 1.15 kWA
CTFB1 60' 60'5 TLC-LED-1200 5.85 kWK

Page 323 of 628 ends

Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 LighƟng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC.

Wayne Makin Shearer Sports Complex
Norco, CA
Lighting System
Pole/Fixture Summary
Pole ID Pole Height Mtg Height Fixture Qty Luminaire Type Load Circuit FP1 70' 70' 5 TLC-LED-1200 5.85 kW J
P1-P10 20' 20' 1 Cree OSQ 0.10 kW M
P11-P20 20' 20' 2 Cree OSQ 0.21 kW M
S1-S2 70' 70' 5 TLC-LED-1200 5.85 kW F
S3 70' 70' 3 TLC-LED-1200 3.51 kW I
70' 5 TLC-LED-1200 5.85 kW F
S4 70' 70' 3 TLC-LED-1200 3.51 kW G
70' 1 TLC-LED-900 0.89 kW G
S5 70' 70' 1 TLC-LED-900 0.89 kW G
70' 3 TLC-LED-1200 3.51 kW G
70' 3 TLC-LED-1200 3.51 kW I
20' 1 Cree OSQ 0.10 kW N
S6 80' 80' 2 TLC-LED-900 1.78 kW O
80' 4 TLC-LED-1200 4.68 kW G
80' 4 TLC-LED-1200 4.68 kW H
20' 1 Cree OSQ 0.10 kW N
S7 80' 80' 4 TLC-LED-1200 4.68 kW G
80' 4 TLC-LED-1200 4.68 kW H
20' 1 Cree OSQ 0.10 kW N
S8-S9 70' 70' 1 TLC-LED-900 0.89 kW H
70' 3 TLC-LED-1200 3.51 kW H
20' 1 Cree OSQ 0.10 kW N
53 254 233.26 kW
Circuit Summary
Circuit Description Load Fixture Qty
A Baseball 1 48.28 kW 40
B Baseball 2 19.64 kW 18
C Baseball 3 20.20 kW 18
D Baseball 4 20.20 kW 18
E Baseball 5 20.20 kW 18
F Soccer 1 23.40 kW 20
G Soccer 2 18.16 kW 16
H Soccer 3 18.16 kW 16
I Practice Soccer 10.53 kW 9
J Practice Football 1 5.85 kW 5
K Practice Football 2 5.85 kW 5
L Tball 13.51 kW 14
M Parking 5.52 kW 36
N Security Lights 1.98 kW 19
O Soccer Parking 1.78 kW 2
Fixture Type Summary
Type Source Wattage Lumens L90 L80 L70 Quantity
Cree OSQ LED 4000K - 70 CRI 104W 15,939 -- -- -- 49
TLC-BT-575 LED 5700K - 75 CRI 575W 52,000 >120,000 >120,000 >120,000 26 TLC-LED-1200 LED 5700K - 75 CRI 1170W 136,000 >120,000 >120,000 >120,000 95 TLC-LED-1500 LED 5700K - 75 CRI 1430W 160,000 >120,000 >120,000 >120,000 56 TLC-LED-400 LED 4000K - 70 CRI 400W 46,500 >120,000 >120,000 >120,000 6 TLC-LED-900 LED 5700K - 75 CRI 890W 89,600 >120,000 >120,000 >120,000 22 Single Luminaire Amperage Draw Chart
Driver SpeciĮcaƟons
(.90 min power factor)
Line Amperage Per Luminaire
(max draw)
Single Phase Voltage 208
(60)
220
(60)
240
(60)
277
(60)
347
(60)
380
(60)
480
(60)

CREE OSQ - - - - - - -
TLC-BT-575 3.3 3.2 2.9 2.5 2.0 1.8 1.5
TLC-LED-1200 7.0 6.6 6.1 5.2 4.2 3.8 3.0
TLC-LED-1500 8.5 8.1 7.4 6.4 5.1 4.7 3.7
TLC-LED-400 2.3 2.2 2.0 1.7 1.4 1.3 1.0
TLC-LED-900 5.3 5.0 4.6 4.0 3.2 2.9 2.3

Page 324 of 628 ends

Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 LighƟng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC.

Wayne Makin Shearer Sports Complex
Norco, CA
Light Level Summary
Calculation Grid Summary
Grid Name Calculation Metric Illumination Circuits Fixture Ave Min Max Max/Min Ave/Min Qty
Baseball 1 (Infield) Horizontal Illuminance 51 41 60 1.45 1.24 A 40 Baseball 1 (Outfield) Horizontal Illuminance 33.2 22 46 2.04 1.51 A 40 Baseball 2 (Infield) Horizontal Illuminance 52.7 44 67 1.53 1.20 B 18 Baseball 2 (Outfield) Horizontal Illuminance 30.6 21 42 2.03 1.46 B 18 Baseball 3 (Infield) Horizontal Illuminance 55.6 39 66 1.71 1.43 C 18 Baseball 3 (Outfield) Horizontal Illuminance 31.6 22 49 2.24 1.44 C 18 Baseball 4 (Infield) Horizontal Illuminance 53.3 44 69 1.55 1.21 D 18 Baseball 4 (Outfield) Horizontal Illuminance 31 21 41 1.90 1.48 D 18 Baseball 5 (Infield) Horizontal Illuminance 56.9 44 77 1.73 1.29 E 18 Baseball 5 (Outfield) Horizontal Illuminance 32.5 20 41 2.08 1.63 E 18 Field 6 (Infield) Horizontal Illuminance 57.3 43 69 1.59 1.33 L 14 Field 6 (Outfield) Horizontal Illuminance 39.5 21 53 2.46 1.88 L 14 Practice Football 1 Horizontal Illuminance 33.9 18 50 2.75 1.88 B,C,J 41 Practice Football 2 Horizontal Illuminance 37 11 54 4.76 3.36 D,E,K 41 Practice Soccer Horizontal Illuminance 36 12 49 4.28 3.00 I 9 Soccer 1 Horizontal Illuminance 30.7 24 38 1.58 1.28 F 20 Soccer 1 Area Horizontal 19.4 2 38 23.15 9.70 F 20
Soccer 2 Horizontal Illuminance 36.3 25 45 1.82 1.45 G 16 Soccer 3 Horizontal Illuminance 34.7 24 43 1.75 1.45 H 16 Soccer Parking Horizontal Illuminance 5.90 0 16 6557.19 O 2 South Parking Horizontal Illuminance 3.90 0 18 287.61 M 36 Spill @ Homes Horizontal 0.40 0 3 0.00 A,B,C,D,E,F,G 233 Spill @ Homes Max Candela (by Fixture) 7473 5 38361 7216.30 1494.66 A,B,C,D,E,F,G 233 Spill @ Homes Max Vertical Illuminance Metric 0.50 0 3 0.00 A,B,C,D,E,F,G 233 Walkway Lights Horizontal Illuminance 0 0 0 0.00 N 19
West Parking Horizontal Illuminance 2.30 0 15 99447.09 M 36

Page 325 of 628 ends

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 LighƟng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC.

CTC2
B1
54 56
50 48
43 40
31 28
30 28
24 55
56 54
54 50
43 42
39 38
33 31
26 47
54 60
56 50
43 37
36 38
38 33
27 47
53 56
52 47
40 36
36 37
34 37
28 44
52 50
46 41
35 32
33 37
36 33
43 46
44 39
34 30
26 26
29 31
29 34
44 37
34 30
27 25
25 29
30 29
41 36
34 32
29 26
25 25
24 31
40 38
35 36
33 28
25 22
32 36
36 32
36 36
30 24
31 37
38 34
37 32
30 31
24 A1
75'
333'
50'
50'
45'
188'
316'
117'
42'
51'
188'
45'
C1
A2 B2
SCALE IN FEET 1 : 80
0' 80' 160'
Equipment List For Areas Shown
Pole Luminaires

QTY LOCATION SIZE GRADE

ELEVATION

ABOVE GRADE

LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
OTHER
GRIDS
1 A1 70' - 70.1' TLC-LED-1200 4 4 0
20' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
1 A2 70' - 71.0' TLC-LED-1200 4 4 0

71.0' TLC-LED-400 2* 0 2

15.5' TLC-BT-575 1 1 0
1 B1 80' - 80.2' TLC-LED-1500 7 7 0

15.5' TLC-BT-575 1 1 0
1 B2 80' - 80.2' TLC-LED-1500 7 7 0

80.2' TLC-LED-400 2* 0 2

15.5' TLC-BT-575 1 1 0
1 C1 70' - 69.7' TLC-LED-1200 5* 0 5

69.7' TLC-LED-1500 5 5 0

15.5' TLC-BT-575 2 2 0
1 CTC2 80' - 80.0' TLC-LED-1500 5 5 0

15.5' TLC-BT-575 2 2 0
6 Totals 50 40 10
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
Wayne Makin Shearer Sports Complex
Norco, CA
Grid Summary
Name Baseball 1
Size 330'/330'/330' - basepath 90'
Spacing 30.0' x 30.0'
Height 3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Infield Outfield
Guaranteed Average 50 30
Scan Average 51.0 33.2
Maximum 60 46
Minimum 41 22
Avg/Min 1.23 1.48
Guaranteed Max/Min 2 2.5
Max/Min 1.45 2.04
UG (adjacent pts) 1.18 1.42
CU 0.73
No. of Points 25 90

LUMINAIRE INFORMATION
Applied Circuits A
No. of Luminaires 40
Total Load 48.28 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.

Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.

Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.

Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures

Page 326 of 628 ends

located within 3 feet (1m) of design locations.

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 LighƟng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC. 31 28 23 21 31 44 47 50 51 47
33 40 37 31 26 32 47 53 53 61 57
34 42 39 35 30 33 48 64 57 50 53
27 35 38 34 31 35 52 66 67 53 48
29 33 30 30 34 45 54 56 50 45
22 26 27 27 29 33 38 41 41 39
21 23 25 26 28 30 34 36 31
21 24 26 29 30 33 34 28
22 26 31 33 34 35 28
23 29 33 37 35 26
26 32 23
B3 A3
A4
B4 10' 205'
213'
20'
26'
23'
40'
35'
SCALE IN FEET 1 : 60
0' 60' 120'
Equipment List For Areas Shown
Pole Luminaires

QTY LOCATION SIZE GRADE

ELEVATION

ABOVE GRADE

LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
OTHER
GRIDS
2 A3-A4 60' - 59.7' TLC-LED-1200 1 1 0

59.7' TLC-LED-900 2 2 0
20' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
1 B3 70' - 70.3' TLC-LED-1500 8 4 4
20' CREE OSQ 1 0 1

15.5' TLC-BT-575 2 1 1
1 B4 70' - 70.3' TLC-LED-1200 3* 0 3

70.3' TLC-LED-1500 4 4 0
20' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
4 Totals 30 18 12
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
Wayne Makin Shearer Sports Complex
Norco, CA
Grid Summary
Name Baseball 2
Size 200'/200'/200' - basepath 60'
Spacing 20.0' x 20.0'
Height 3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Infield Outfield
Guaranteed Average 50 30
Scan Average 52.7 30.6
Maximum 67 42
Minimum 44 21
Avg/Min 1.21 1.49
Guaranteed Max/Min 2 2.5
Max/Min 1.53 2.03
UG (adjacent pts) 1.33 1.50
CU 0.67
No. of Points 25 71

LUMINAIRE INFORMATION
Applied Circuits B
No. of Luminaires 18
Total Load 19.64 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.

Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.

Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.

Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures

Page 327 of 628 ends

located within 3 feet (1m) of design locations.

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 LighƟng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC. 44 48
51 63
57 46
32 25
25 22
47 54
51 66
63 44
36 31
31 33
22 50
52 60
65 59
40 32
31 34
37 31
58 64
66 58
48 36
31 31
33 34
26 56
63 59
48 39
31 28
30 32
29 49
49 43
37 32
28 26
27 27
23 37
41 36
33 29
27 26
25 22
31 35
36 33
31 27
25 22
31 36
37 36
33 27
23 24
35 39
35 31
25 24
31 27
B5
A6
A535'
47'
205'
10'
36'
33'
20'
202' B3
SCALE IN FEET 1 : 60
0' 60' 120'
Equipment List For Areas Shown
Pole Luminaires

QTY LOCATION SIZE GRADE

ELEVATION

ABOVE GRADE

LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
OTHER
GRIDS
1 A5 60' 0' 60.0' TLC-LED-1200 2/2* 2 2

60.0' TLC-LED-900 1/1* 1 1

20.0' CREE OSQ 2 0 2

15.5' TLC-BT-575 2 1 1
1 A6 60' 0' 59.7' TLC-LED-1200 2 2 0

59.7' TLC-LED-900 1 1 0

20.0' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
1 B3 70' - 70.3' TLC-LED-1500 8 4 4
20' CREE OSQ 1 0 1

15.5' TLC-BT-575 2 1 1
1 B5 70' 0' 71.0' TLC-LED-1500 4 4 0

15.5' TLC-BT-575 1 1 0
4 Totals 31 18 13
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
Wayne Makin Shearer Sports Complex
Norco, CA
Grid Summary
Name Baseball 3
Size 200'/200'/200' - basepath 60'
Spacing 20.0' x 20.0'
Height 3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Infield Outfield
Guaranteed Average 50 30
Scan Average 55.6 31.6
Maximum 66 49
Minimum 39 22
Avg/Min 1.43 1.43
Guaranteed Max/Min 2 2.5
Max/Min 1.71 2.24
UG (adjacent pts) 1.28 1.48
CU 0.66
No. of Points 25 71

LUMINAIRE INFORMATION
Applied Circuits C
No. of Luminaires 18
Total Load 20.20 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.

Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.

Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.

Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures

Page 328 of 628 ends

located within 3 feet (1m) of design locations.

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 LighƟng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC. 29 29 26 28 37 47 49 49 51 49
30 37 35 32 32 37 51 59 50 54 49
33 40 36 33 32 38 55 68 58 50 48
26 37 36 33 32 38 51 63 69 61 49
31 34 31 31 35 44 51 53 52 52
24 28 28 29 31 35 37 34 36 41
22 25 28 30 31 31 28 28 30
21 26 29 32 32 29 26 26
23 29 35 36 35 28 26
25 32 36 37 31 23
28 32 22
B6
B7
A7
35'
37'
10'
205'
210'
20'
35'
40'
A5
SCALE IN FEET 1 : 60
0' 60' 120'
Equipment List For Areas Shown
Pole Luminaires

QTY LOCATION SIZE GRADE

ELEVATION

ABOVE GRADE

LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
OTHER
GRIDS
1 A5 60' 0' 60.0' TLC-LED-1200 2/2* 2 2

60.0' TLC-LED-900 1/1* 1 1

20.0' CREE OSQ 2 0 2

15.5' TLC-BT-575 2 1 1
1 A7 60' 0' 59.7' TLC-LED-1200 2 2 0

59.7' TLC-LED-900 1 1 0

20.0' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
1 B6 70' 0' 71.0' TLC-LED-1500 4 4 0

20.0' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
1 B7 70' 0' 70.4' TLC-LED-1500 8 4 4

20.0' CREE OSQ 1 0 1

15.5' TLC-BT-575 2 1 1
4 Totals 32 18 14
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
Wayne Makin Shearer Sports Complex
Norco, CA
Grid Summary
Name Baseball 4
Size 200'/200'/200' - basepath 60'
Spacing 20.0' x 20.0'
Height 3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Infield Outfield
Guaranteed Average 50 30
Scan Average 53.3 31.0
Maximum 69 41
Minimum 44 21
Avg/Min 1.20 1.44
Guaranteed Max/Min 2 2.5
Max/Min 1.55 1.90
UG (adjacent pts) 1.30 1.43
CU 0.65
No. of Points 25 71

LUMINAIRE INFORMATION
Applied Circuits D
No. of Luminaires 18
Total Load 20.20 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.

Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.

Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.

Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures

Page 329 of 628 ends

located within 3 feet (1m) of design locations.

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 LighƟng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC. 50 54
55 50
49 40
32 30
33 51
62 59
63 52
40 34
33 38
34 50
58 69
74 55
38 32
33 37
34 47
65 77
69 53
37 32
34 33
28 49
56 56
54 44
35 31
31 30
22 39
40 37
38 36
32 28
27 25
29 32
31 32
32 30
27 25
20 27
31 34
36 35
30 27
22 29
35 38
41 38
31 25
29 39
41 39
36 28
29 35
28 A10
A9
B8
18'
209'
35'
40'
189'
24'
29'
35'
B7
SCALE IN FEET 1 : 60
0' 60' 120'
Equipment List For Areas Shown
Pole Luminaires

QTY LOCATION SIZE GRADE

ELEVATION

ABOVE GRADE

LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
OTHER
GRIDS
1 A9 60' - 59.7' TLC-LED-1200 2 2 0

59.7' TLC-LED-900 1 1 0
20' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
1 A10 60' - 60.0' TLC-LED-1200 2 2 0

60.0' TLC-LED-900 1/3* 1 3
20' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
1 B7 70' 0' 70.4' TLC-LED-1500 8 4 4

20.0' CREE OSQ 1 0 1

15.5' TLC-BT-575 2 1 1
1 B8 70' - 71.0' TLC-LED-1500 4 4 0
20' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
4 Totals 30 18 12
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
Wayne Makin Shearer Sports Complex
Norco, CA
Grid Summary
Name Baseball 5
Size 190'/200'/200' - basepath 60'
Spacing 20.0' x 20.0'
Height 3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Infield Outfield
Guaranteed Average 50 30
Scan Average 56.9 32.5
Maximum 77 41
Minimum 44 20
Avg/Min 1.28 1.65
Guaranteed Max/Min 2 2.5
Max/Min 1.73 2.08
UG (adjacent pts) 1.40 1.39
CU 0.65
No. of Points 25 66

LUMINAIRE INFORMATION
Applied Circuits E
No. of Luminaires 18
Total Load 20.20 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.

Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.

Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.

Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures

Page 330 of 628 ends

located within 3 feet (1m) of design locations.

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 LighƟng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC.

B9
A8
61 61
54 51
37 60
69 58
66 57
50 40
60 57
56 61
59 53
44 57
63 57
52 51
47 37
56 61
58 49
43 39
28 43
53 52
46 40
31 21
31 49
50 44
34 23
31 33
32 31'
31'
121'
20'
27'
122'
21'
27'
B10 A10
SCALE IN FEET 1 : 50
0' 50' 100'
Equipment List For Areas Shown
Pole Luminaires

QTY LOCATION SIZE GRADE

ELEVATION

ABOVE GRADE

LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
OTHER
GRIDS
1 A8 60' - 59.7' TLC-LED-900 3 3 0
1 A10 60' - 60.0' TLC-LED-1200 2 0 2

60.0' TLC-LED-900 1/3* 3 1
20' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 0 1
1 B9 60' - 59.7' TLC-LED-1200 3 3 0

15.5' TLC-BT-575 1 1 0
1 B10 60' - 60.2' TLC-LED-1200 3 3 0
40' TLC-LED-400 2 0 2

15.5' TLC-BT-575 1 1 0
4 Totals 21 14 7
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
Wayne Makin Shearer Sports Complex
Norco, CA
Grid Summary
Name Field 6
Size Irregular 127'/148'/135'
Spacing 20.0' x 20.0'
Height 3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Infield Outfield
Scan Average 57.3 39.5
Maximum 69 53
Minimum 43 21
Avg/Min 1.33 1.85
Max/Min 1.59 2.46
UG (adjacent pts) 1.23 1.62
CU 0.65
No. of Points 24 25

LUMINAIRE INFORMATION
Applied Circuits L
No. of Luminaires 14
Total Load 13.51 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.

Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.

Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.

Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locations.

Page 331 of 628 ends

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 LighƟng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC. 39 37
34 33
32 33
33 31
24 37
37 35
34 35
34 32
31 26
39 38
38 36
35 33
32 30
28 43
42 39
35 33
32 30
29 29
44 41
38 33
30 28
27 28
26 41
37 34
31 29
27 26
26 20
43 39
35 32
30 29
29 28
18 48
44 39
35 32
31 30
29 22
44 45
42 37
34 33
31 30
27 39
41 39
37 35
34 33
31 27
34 36
36 35
34 34
34 33
28 33
36 37
34 32
33 36
34 28
46 50
45 36
32 34
37 36
28 149'
263' 21'
225'
220'
182'
22'
210'
203'
13'
28'
0'
206'
174'
148'
A5 240'
B5
A6
B4
B3
FP1
A3
A4
SCALE IN FEET 1 : 80
0' 80' 160'
Equipment List For Areas Shown
Pole Luminaires

QTY LOCATION SIZE GRADE

ELEVATION

ABOVE GRADE

LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
OTHER
GRIDS
2 A3-A4 60' - 59.7' TLC-LED-1200 1 1 0

59.7' TLC-LED-900 2 2 0
20' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
1 A5 60' 0' 60.0' TLC-LED-1200 2/2* 2 2

60.0' TLC-LED-900 1/1* 1 1

20.0' CREE OSQ 2 0 2

15.5' TLC-BT-575 2 1 1
1 A6 60' 0' 59.7' TLC-LED-1200 2 2 0

59.7' TLC-LED-900 1 1 0

20.0' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
1 B3 70' - 70.3' TLC-LED-1500 8 8 0
20' CREE OSQ 1 0 1

15.5' TLC-BT-575 2 2 0
1 B4 70' - 70.3' TLC-LED-1200 3* 0 3

70.3' TLC-LED-1500 4 4 0
20' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
1 B5 70' 0' 71.0' TLC-LED-1500 4 4 0

15.5' TLC-BT-575 1 1 0
1 FP1 70' 0' 70.2' TLC-LED-1200 5 5 0
8 Totals 55 41 14
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
Wayne Makin Shearer Sports Complex
Norco, CA
Grid Summary
Name Practice Football 1
Size 260' x 170'
Spacing 20.0' x 20.0'
Height 3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average 33.9
Maximum 50
Minimum 18
Avg/Min 1.85
Max/Min 2.75
UG (adjacent pts) 1.54
CU 0.32
No. of Points 117

LUMINAIRE INFORMATION
Applied Circuits B,C,J
No. of Luminaires 41
Total Load 45.69 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.

Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.

Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.

Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locations.

Page 332 of 628 ends

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 LighƟng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC. 35 36
36 34
30 28
27 21
13 31
33 34
33 31
29 25
19 11
33 38
39 36
33 30
26 20
12 40
43 43
39 35
33 29
23 16
44 44
42 38
34 35
36 33
23 40
37 33
33 33
36 45
48 33
35 33
30 31
34 41
50 54
36 43
41 38
35 36
43 52
50 27
42 44
43 41
40 44
49 43
23 37
39 42
42 43
47 53
47 27
33 36
37 38
41 45
50 50
41 33
34 35
36 38
42 49
54 50
41 43
42 39
38 41
48 52
49 137'
245' 31'
220'
27'
50'
194'
0'
141'
249'
13'
233'
205'
174'
214'
175'
A5
B6
CTFB1
B7
A9
B8
A10 A7
SCALE IN FEET 1 : 80
0' 80' 160'
Equipment List For Areas Shown
Pole Luminaires

QTY LOCATION SIZE GRADE

ELEVATION

ABOVE GRADE

LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
OTHER
GRIDS
1 A5 60' 0' 60.0' TLC-LED-1200 2/2* 2 2

60.0' TLC-LED-900 1/1* 1 1

20.0' CREE OSQ 2 0 2

15.5' TLC-BT-575 2 1 1
1 A7 60' 0' 59.7' TLC-LED-1200 2 2 0

59.7' TLC-LED-900 1 1 0

20.0' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
1 A9 60' - 59.7' TLC-LED-1200 2 2 0

59.7' TLC-LED-900 1 1 0
20' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
1 A10 60' - 60.0' TLC-LED-1200 2 2 0

60.0' TLC-LED-900 1/3* 1 3
20' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
1 B6 70' 0' 71.0' TLC-LED-1500 4 4 0

20.0' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
1 B7 70' 0' 70.4' TLC-LED-1500 8 8 0

20.0' CREE OSQ 1 0 1

15.5' TLC-BT-575 2 2 0
1 B8 70' - 71.0' TLC-LED-1500 4 4 0
20' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 1 0
1 CTFB1 60' 0' 60.4' TLC-LED-1200 5 5 0
8 Totals 56 41 15
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
Wayne Makin Shearer Sports Complex
Norco, CA
Grid Summary
Name Practice Football 2
Size 260' x 170'
Spacing 20.0' x 20.0'
Height 3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average 37.0
Maximum 54
Minimum 11
Avg/Min 3.26
Max/Min 4.76
UG (adjacent pts) 1.89
CU 0.34
No. of Points 117

LUMINAIRE INFORMATION
Applied Circuits D,E,K
No. of Luminaires 41
Total Load 46.25 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.

Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.

Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.

Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locations.

Page 333 of 628 ends

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 LighƟng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC.

S1
S2
36 34
28 24
28 30
34 34
31 28
30 32
33 31
31 29
29 31
32 31
30 29
31 34
29 30
30 30
33 38
28 29
30 30
31 34
29 29
30 29
30 32
29 30
29 29
32 35
27 28
27 26
33 35
S3
135'
107'
127'
103'
138'
87'
138'
87'
C1
SCALE IN FEET 1 : 80
0' 80' 160'
Equipment List For Areas Shown
Pole Luminaires

QTY LOCATION SIZE GRADE

ELEVATION

ABOVE GRADE

LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
OTHER
GRIDS
1 C1 70' - 69.7' TLC-LED-1200 5* 5 0

69.7' TLC-LED-1500 5 0 5

15.5' TLC-BT-575 2 0 2
2 S1-S2 70' - 70.1' TLC-LED-1200 5 5 0
1 S3 70' - 70.3' TLC-LED-1200 5/3* 5 3
4 Totals 30 20 10
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
Wayne Makin Shearer Sports Complex
Norco, CA
Grid Summary
Name Soccer 1
Size 250' x 155'
Spacing 30.0' x 30.0'
Height 3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Guaranteed Average 30
Scan Average 30.7
Maximum 38
Minimum 24
Avg/Min 1.26
Guaranteed Max/Min 2.5
Max/Min 1.58
UG (adjacent pts) 1.26
CU 0.54
No. of Points 54

LUMINAIRE INFORMATION
Applied Circuits F
No. of Luminaires 20
Total Load 23.40 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.

Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.

Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.

Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures

Page 334 of 628 ends

located within 3 feet (1m) of design locations.

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 Ligh Ɵng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC.

S1
S2
2 2
2 2
5 4
4 4
4 3
13 10
8 7
8 9
7 29
27 22
16 13
11 12
15 13
7 29
38 35
26 20
18 18
20 21
20 13
17 33
27 20
8 19
32 32
23 8
20 31
33 21
9 26
33 34
26 13
27 33
35 33
20 26
31 36
33 22
25 29
37 34
22 24
27 37
34 22
23 27
37 34
21 24
28 35
31 18
22 28
34 25
12 19
27 36
24 9
18 27
35 25
16 24
25 25
24 23
23 26
30 31
27 17
16 25
27 24
19 16
16 17
18 22
16 22
25 21
17 12
10 9
11 19
18 16
13 9
6 13
11 10
8 6
7 7
6 4
4 4
3 2
2 2
S3
135'
107'
127' 103'
138'
87'
138' 87'
C1
SCALE IN FEET 1 : 80
0' 80' 160'
Equipment List For Areas Shown
Pole Luminaires

QTY LOCATION SIZE GRADE

ELEVATION

ABOVE GRADE

LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
OTHER
GRIDS
1 C1 70'- 69.7' TLC-LED-1200 5*50

69.7' TLC-LED-1500505

15.5' TLC-BT-575202
2 S1-S2 70'- 70.1' TLC-LED-1200550
1 S3 70'- 70.3' TLC-LED-1200 5/3*53
4 Totals 30 20 10
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
Wayne Makin Shearer Sports Complex
Norco, CA
Grid Summary
Name Soccer 1 Area
Size 250' x 155'
Spacing 20.0' x 20.0'
Height 3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average 19.4
Maximum 38
Minimum2
Avg/Min 11.91
Max/Min 23.15
UG (adjacent pts) 2.67
CU 0.43
No. of Points 154

LUMINAIRE INFORMATION
Applied Circuits
F
No. of Luminaires 20
Total Load 23.40 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.

Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.

Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.

Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locations.

Page 335 of 628 ends

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 Ligh Ɵng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC.

S4
33 41 35 33 30
32 39 40 41 37
28 36 39 42 39
26 32 37 43 45
25 31 38 45 39
26 32 37 43 45
28 36 39 42 39
33 39 39 41 37
33 41 35 33 30
S5 105' 88'
105'
88'
91'
155'
91'
155'
S6
S7
SCALE IN FEET 1 : 60
0' 60' 120'
Equipment List For Areas Shown
Pole Luminaires

QTY LOCATION SIZE GRADE

ELEVATION

ABOVE GRADE

LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
OTHER
GRIDS
1 S4 70'- 70.1' TLC-LED-1200330

70.1' TLC-LED-900110
1 S5 70'- 70.3' TLC-LED-1200 3/3*33

70.3' TLC-LED-900110
20' CREE OSQ101
1 S6 80'- 80.2' TLC-LED-1200844

80.2' TLC-LED-900 2*02
20' CREE OSQ101
1 S7 80'- 80.5' TLC-LED-1200844
20' CREE OSQ101
4 Totals 32 16 16
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
Wayne Makin Shearer Sports Complex
Norco, CA
Grid Summary
Name Soccer 2
Size 250' x 150'
Spacing 30.0' x 30.0'
Height 3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Guaranteed Average 30
Scan Average 36.3
Maximum 45
Minimum 25
Avg/Min 1.47
Guaranteed Max/Min 2.5
Max/Min 1.82
UG (adjacent pts) 1.29
CU 0.69
No. of Points 45

LUMINAIRE INFORMATION
Applied Circuits
G
No. of Luminaires 16
Total Load 18.16 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.

Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.

Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.

Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures

Page 336 of 628 ends

located within 3 feet (1m) of design locations.

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 Ligh Ɵng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC.
35 35 37 42 34
28 38 40 39 33
31 38 35 34 28
41 40 34 30 25
38 40 33 29 24
41 40 34 30 25
31 38 35 34 28
28 38 40 39 33
35 35 37 43 34
S8
S9
92'
155'
92'
155'
95'
87'
95'
88'
S6
S7
SCALE IN FEET 1 : 60
0' 60' 120'
Equipment List For Areas Shown
Pole Luminaires

QTY LOCATION SIZE GRADE

ELEVATION

ABOVE GRADE

LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
OTHER
GRIDS
1 S6 80'- 80.2' TLC-LED-1200844

80.2' TLC-LED-900 2*02
20' CREE OSQ101
1 S7 80'- 80.5' TLC-LED-1200844
20' CREE OSQ101
2 S8-S9 70'- 70.1' TLC-LED-1200330

70.1' TLC-LED-900110
20' CREE OSQ101
4 Totals 30 16 14
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
Wayne Makin Shearer Sports Complex
Norco, CA
Grid Summary
Name Soccer 3
Size 250' x 150'
Spacing 30.0' x 30.0'
Height 3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Guaranteed Average 30
Scan Average 34.7
Maximum 43
Minimum 24
Avg/Min 1.43
Guaranteed Max/Min 2.5
Max/Min 1.75
UG (adjacent pts) 1.36
CU 0.66
No. of Points 45

LUMINAIRE INFORMATION
Applied Circuits
H
No. of Luminaires 16
Total Load 18.16 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.

Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.

Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.

Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures

Page 337 of 628 ends

located within 3 feet (1m) of design locations.

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 LighƟng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC. 32 31
20 27
29 43
44 34
45 43
38 41
38 45
37 33
37 36
38 31
31 34
35 34
27 33
37 37
37 31
34 40
39 41
41 30
37 42
47 48
27 32
35 42
49 35
40 40
38 37
33 43
49 42
23 26
34 36
27 12
46'
212'
137'
55'
1'
11'
S5
B4
S3
SCALE IN FEET 1 : 40
0' 40' 80'
Equipment List For Areas Shown
Pole Luminaires

QTY LOCATION SIZE GRADE

ELEVATION

ABOVE GRADE

LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
OTHER
GRIDS
1 B4 70' - 70.3' TLC-LED-1200 3* 3 0

70.3' TLC-LED-1500 4 0 4
20' CREE OSQ 1 0 1

15.5' TLC-BT-575 1 0 1
1 S3 70' - 70.3' TLC-LED-1200 5/3* 3 5
1 S5 70' - 70.3' TLC-LED-1200 3/3* 3 3

70.3' TLC-LED-900 1 0 1
20' CREE OSQ 1 0 1
3 Totals 25 9 16
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
Wayne Makin Shearer Sports Complex
Norco, CA
Grid Summary
Name Practice Soccer
Size 230' x 100'
Spacing 20.0' x 20.0'
Height 3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average 36.0
Maximum 49
Minimum 12
Avg/Min 3.12
Max/Min 4.28
UG (adjacent pts) 2.32
CU 0.68
No. of Points 60

LUMINAIRE INFORMATION
Applied Circuits I
No. of Luminaires 9
Total Load 10.53 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.

Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.

Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.

Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locations.

Page 338 of 628 ends

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 LighƟng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC.

0.6 1.3

2.2 2.2

3.2 3.6

2.7 2.6

2.8 2.7

5.4 4.6

0.7 1.5

3.6 6.0

8.1 9.1

6.5 5.3

3.6 2.9

4.4 7.1

1.0 1.8

3.5 8.2

9.3 9.7

9.1 5.6

3.6 3.3

4.6 7.2

1.1 1.9

4.0 8.0

11.5 12.2

9.1 6.2

3.3 3.6

5.7 4.7

1.0 1.8

3.4 8.5

8.7 9.2

8.7 5.2

3.1 3.6

3.1 2.9

0.7 1.6

3.6 5.5

7.7 8.6

6.1 5.0

2.9 1.9

1.4 1.4

0.7 1.3

1.9 2.1

2.9 3.3

2.6 2.3

2.4 1.6

1.2 1.2

0.6 0.8

0.8 1.0

1.4 1.4

1.4 1.3

1.7 2.8

2.2 2.2

0.6 0.8

0.8 1.1

1.5 1.6

1.5 1.4

1.8 3.1

5.2 4.6

0.7 1.4

2.3 2.4

3.3 3.8

2.9 2.8

3.1 2.8

4.9 6.3

0.8 1.6

3.7 6.1

8.2 9.2

6.6 5.4

3.7 3.0

4.4 6.3

1.0 1.9

3.5 8.3

9.3 9.7

9.1 5.6

3.5 3.2

5.5 5.5

1.1 2.0

4.1 8.0

11.6 12.2

9.1 6.1

3.2 3.9

4.7 4.3

1.0 1.8

3.4 8.5

8.7 9.1

8.7 5.2

3.0 2.9

2.0 1.8

0.7 1.6

3.6 5.5

7.7 8.6

6.1 5.0

2.7 1.4

1.1 1.0

0.7 1.3

1.9 2.1

2.9 3.3

2.6 2.3

2.3 1.5

1.1 1.1

0.6 0.8

0.8 1.0

1.4 1.4

1.3 1.3

1.7 2.8

2.1 2.1

0.6 0.8

0.8 1.1

1.5 1.6

1.4 1.3

1.8 3.1

5.2 4.6

0.7 1.4

2.3 2.4

3.3 3.8

2.9 2.8

3.1 2.8

4.9 6.3

0.8 1.6

3.7 6.1

8.2 9.2

6.6 5.4

3.7 3.0

4.4 6.3

1.0 1.9

3.5 8.3

9.3 9.7

9.1 5.6

3.5 3.2

5.5 5.5

1.1 2.0

4.1 8.0

11.6 12.2

9.1 6.1

3.2 3.9

4.7 4.3

1.0 1.8

3.4 8.5

8.7 9.1

8.7 5.2

3.0 2.9

2.0 1.8

0.7 1.6

3.6 5.5

7.7 8.6

6.1 5.0

2.7 1.4

1.1 1.0

0.7 1.3

1.9 2.1

2.9 3.3

2.6 2.3

2.3 1.5

1.1 1.1

0.6 0.8

0.8 1.0

1.4 1.4

1.3 1.3

1.7 2.8

2.1 2.1

0.6 0.8

0.8 1.1

1.5 1.6

1.4 1.3

1.8 3.1

5.2 4.6

0.7 1.4

2.3 2.4

3.3 3.8

2.9 2.8

3.1 2.8

4.9 6.3

0.8 1.6

3.7 6.1

8.2 9.2

6.6 5.4

3.7 3.0

4.4 6.3

1.0 1.9

3.5 8.3

9.3 9.7

9.1 5.6

3.5 3.2

5.5 5.5

1.1 2.0

4.1 8.0

11.6 12.2

9.1 6.1

3.2 3.9

4.7 4.3

1.0 1.8

3.4 8.5

8.7 9.1

8.7 5.2

3.0 2.9

2.0 1.8

0.7 1.6

3.6 5.5

7.7 8.6

6.1 5.0

2.7 1.4

1.1 1.0

0.7 1.3

1.9 2.1

2.9 3.3

2.6 2.3

2.3 1.5

1.1 1.1

0.6 0.8

0.8 1.0

1.4 1.4

1.3 1.3

1.7 2.8

2.1 2.1

0.6 0.8

0.8 1.1

1.5 1.6

1.4 1.3

1.8 3.1

5.2 4.6

0.7 1.4

2.3 2.4

3.3 3.8

2.9 2.8

3.1 2.8

4.9 6.3

0.8 1.6

3.7 6.1

8.2 9.2

6.6 5.4

3.7 3.0

4.4 6.4

1.0 1.9

3.5 8.3

9.3 9.8

9.1 5.6

3.5 3.2

5.5 5.5

1.1 2.0

4.1 8.0

11.6 12.3

9.1 6.1

3.2 3.9

4.7 4.3

1.0 1.9

3.4 8.5

8.7 9.2

8.7 5.3

3.0 2.9

2.0 1.9

0.8 1.6

3.7 5.5

7.8 8.7

6.2 5.1

2.8 1.5

1.2 1.0

0.8 1.4

2.1 2.3

3.2 3.6

2.8 2.5

2.5 1.6

1.3 1.1

0.8 1.2

1.2 1.6

2.2 2.3

2.1 1.7

2.2 3.1

2.3 2.2

0.7 1.4

2.7 2.6

3.7 4.6

3.5 3.0

3.2 3.5

5.3 4.7

0.8 1.4

3.3 6.6

8.0 9.8

7.2 6.2

3.8 3.1

5.1 6.4

0.9 1.8

3.1 7.6

10.2 10.4

9.8 6.8

4.1 3.6

4.7 6.5

1.0 2.0

3.4 7.6

11.3 11.9

10.1 7.1

3.8 3.6

5.6 5.6

0.9 1.7

2.9 8.0

8.2 8.8

8.4 6.5

3.3 3.8

4.7 4.4

0.6 1.4

3.1 4.8

6.6 8.2

5.9 5.2

3.4 2.8

2.0 2.0

0.6 1.1

1.7 1.8

2.5 3.0

2.5 2.2

2.7 2.0

1.7 1.7

0.6 0.7

0.7 0.9

1.2 1.3

1.3 1.3

1.8 3.1

2.9 2.9

0.6 0.7

0.7 1.0

1.3 1.5

1.5 1.4

1.9 2.9

5.5 4.7

0.6 1.2

2.0 2.1

2.9 3.6

2.9 2.5

3.4 3.0

4.6 7.3

0.7 1.4

3.2 5.5

7.4 9.1

6.7 5.9

4.0 3.1

4.5 7.1

0.9 1.7

3.0 7.9

8.9 9.4

8.9 6.5

3.5 3.4

5.9 4.8

1.0 2.0

3.4 7.6

10.9 11.9

9.8 7.0

3.6 4.1

3.8 3.5

0.9 1.8

3.0 7.8

9.1 9.6

9.1 6.4

3.4 2.8

2.0 1.8

0.7 1.4

3.2 5.8

7.5 9.3

6.8 5.8

3.4 2.6

1.9 1.9

0.6 1.2

2.1 2.1

3.0 3.7

2.9 2.4

3.0 3.4

3.9 3.8

0.6 0.8

0.8 1.0

1.4 1.5

1.5 1.5

2.0 2.6

5.7 5.0

0.6 0.7

0.7 0.9

1.2 1.3

1.4 1.5

2.3 2.7

4.5 6.8

0.6 1.1

1.6 1.7

2.4 2.9

2.4 2.2

3.0 2.9

4.8 7.0

0.6 1.4

3.1 4.5

6.3 7.8

5.7 4.9

3.4 3.4

5.4 4.7

0.8 1.6

2.8 8.0

8.0 8.5

8.2 6.6

3.3 3.6

2.7 2.6

1.0 2.0

3.4 7.5

11.4 11.8

10.1 7.0

3.5 2.6

1.8 1.6

0.9 1.8

3.1 7.5

10.5 10.5

10.0 6.6

3.4 3.1

2.1 2.0

0.7 1.3

3.2 6.8

7.9 9.7

7.3 6.0

3.4 3.5

4.4 4.2

0.6 1.3

2.7 2.6

3.7 4.6

3.5 3.2

3.4 2.9

5.4 5.3

0.5 0.8

0.9 1.1

1.5 1.7

1.6 1.7

2.5 2.8

4.4 6.5

0.5 0.5

0.5 0.7

0.9 1.0

1.1 1.3

1.9 2.5

4.8 6.6

0.5 0.7

0.7 0.9

1.2 1.3

1.3 1.3

1.8 3.0

5.2 4.7

0.6 1.2

2.0 2.1

2.9 3.5

2.8 2.4

2.9 3.1

2.3 2.2

0.8 1.5

3.3 5.6

7.5 9.2

6.7 5.8

3.3 1.9

1.3 1.1

1.2 2.1

3.3 8.3

9.4 9.9

9.4 6.9

3.4 2.2

1.3 0.9

1.4 2.8

4.4 8.8

12.6 13.9

11.4 8.3

5.0 3.5

1.8 1.1

1.4 3.0

5.8 11.1

14.0 15.7

13.8 10.4

7.0 5.2

2.8 1.7

1.4 2.8

6.2 13.2

15.5 18.4

15.2 12.8

7.2 1.4

3.0 5.3

9.5 14.7

15.5 14.0

10.4 1.3

2.5 3.9

8.2 12.9

13.2 12.7

10.3 1.0

1.7 3.3

7.8 8.5

10.1 10.5

10.2 0.7

1.4 3.1

3.6 5.1

6.5 5.2

5.2 0.5

1.0 1.2

1.4 1.9

0.5 0.6

0.6 0.8

1.0 0.6

0.6 0.7

0.8 0.9

0.7 0.9

1.0 1.1

1.0 1.1

1.3 1.4

1.4 1.4

1.5 1.6

1.8 1.8

1.8 1.7

1.9 2.1

2.3 2.4

2.1 2.2

2.4 2.7

2.9 2.5

2.7 2.9

3.2 3.4

3.0 3.3

3.5 3.7

4.0 3.6

3.9 4.1

4.2 4.3

4.1 4.5

4.6 4.6

4.5 4.6

4.9 5.0

4.7 4.3

4.9 5.2

5.1 4.5

3.6 5.1

5.3 5.2

4.3 3.2

5.1 5.4

5.3 4.6

3.5 4.9

5.3 5.4

5.1 4.5

4.5 5.0

5.1 5.3

5.2 4.0

4.4 5.0

5.3 5.6

3.5 4.2

4.8 5.5

5.8 3.5

4.1 5.0

5.6 5.8

3.8 4.7

5.4 5.8

6.1 4.2

4.9 5.6

6.0 6.2

4.2 4.8

5.4 5.8

5.9 4.0

4.6 5.1

5.6 5.7

4.3 4.7

5.0 5.4

5.5 4.6

5.1 5.3

5.3 5.3

5.1 5.6

5.7 5.5

5.0 5.5

5.9 6.1

5.7 4.8

5.6 6.0

6.1 5.6

4.6 5.3

5.7 5.8

5.4 4.6

4.8 5.1

5.1 4.9

4.5 4.1

4.3 4.3

4.2 4.1

3.4 3.6

3.6 3.7

3.7 2.8

2.9 3.0

3.2 3.3

2.2 2.3

2.5 2.7

2.9 1.8

1.9 2.1

2.3 2.5

1.5 1.7

1.8 2.0

2.1 1.3

1.4 1.6

1.6 1.6

0.9 1.1

1.2 1.2

1.2 0.5

0.6 0.8

0.8 0.8

0.3 0.4

0.4 0.5

0.5 0.1

0.1 0.2

0.3 0.3
P20
P9
P18 P15
P1 P2 P4
P19 P16 P11
P6 P7
P10
P3 P5 P8
P17 P14 P13 P12 5'
697'
67'
473'
63'
164'
68'
214'
68'
34'
5'
541'
5'
104'
68'
124'
68'
394'
67'
790'
5'
464'
5'
284'
5'
19'
67'
565'
19'
796'
5'
374'
67'
657'
5'
618'
67'
755'
5'
194'
68'
304'
68'
969'
63'
1106'
B10
A2 B2
SCALE IN FEET 1 : 150
0' 150' 300'
Equipment List For Areas Shown
Pole Luminaires

QTY LOCATION SIZE GRADE

ELEVATION

ABOVE GRADE

LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
OTHER
GRIDS
1 A2 70' - 71.0' TLC-LED-1200 4 0 4

71.0' TLC-LED-400 2* 2 0

15.5' TLC-BT-575 1 0 1
1 B2 80' - 80.2' TLC-LED-1500 7 0 7

80.2' TLC-LED-400 2* 2 0

15.5' TLC-BT-575 1 0 1
1 B10 60' - 60.2' TLC-LED-1200 3 0 3
40' TLC-LED-400 2 2 0

15.5' TLC-BT-575 1 0 1
10 P1-P10 20' 2' 22' CREE OSQ 1 1 0
10 P11-P20 20' 2' 22' CREE OSQ 1/1* 2 0
23 Totals 53 36 17
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
Wayne Makin Shearer Sports Complex
Norco, CA
Grid Summary
Name South Parking
Size 1250' x 120'
Spacing 10.0' x 10.0'
Height 3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average 3.9
Maximum 18
Minimum 0
Avg/Min 60.95
Max/Min 287.61
UG (adjacent pts) 4.37
CU 0.63
No. of Points 1180

LUMINAIRE INFORMATION
Applied Circuits M
No. of Luminaires 36
Total Load 5.52 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.

Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.

Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.

Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locations.

Page 339 of 628 ends

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 LighƟng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC.

0.0 0.1

0.1 0.1

0.0 0.0

0.1 0.2

0.3 0.3

0.2 0.1

0.3 0.5

0.6 0.7

0.7 0.5

0.6 1.0

1.3 1.5

1.5 1.2

1.0 1.8

2.6 3.0

2.7 2.2

1.7 3.2

4.6 5.2

4.7 3.9

2.8 5.2

7.2 7.8

7.2 5.9

4.3 7.7

10.1 10.7

9.8 8.3

6.4 10.7

13.0 13.1

12.0 10.3

8.7 13.5

15.1 15.0

13.7 11.8

10.5 15.0

16.5 16.0

14.6 12.0

11.7 14.8

16.4 16.0

14.0 10.4

12.6 13.8

14.3 13.7

10.7 6.9

13.3 13.4

12.0 9.6

6.5 3.8

12.4 11.9

9.5 6.5

3.8 1.8

10.0 8.6

5.9 3.5

1.6 0.6

6.9 5.3

3.2 1.4

0.6 0.3

4.8 3.2

1.7 0.7

0.3 0.2

4.5 3.1

1.6 0.7

6.0 4.6

2.7 1.2

8.3 6.9

4.4 2.4

9.9 9.0

6.6 4.1

2.2 0.8

10.7 10.3

8.6 5.9

3.6 1.8

10.4 10.2

9.4 7.5

5.0 3.0

9.6 10.4

10.4 9.4

7.1 4.5

9.4 10.9

11.3 10.6

9.0 6.4

9.2 10.9

11.2 10.7

9.6 7.7

8.3 10.1

10.5 10.1

9.3 7.9

7.0 8.9

9.4 9.3

8.6 7.6

5.7 7.5

8.2 8.0

7.5 6.8

4.5 6.1

6.9 6.9

6.5 5.9

3.4 4.8

5.5 5.7

5.3 4.8

2.6 3.6

4.3 4.4

4.3 3.9

1.8 2.6

3.2 3.3

3.1 2.8

1.3 1.8

2.2 2.3

2.2 2.1

0.9 1.2

1.5 1.6

1.5 1.5

0.5 0.8

0.9 1.0

1.0 1.0

0.3 0.5

0.6 0.7

0.7 0.6
19'
185' S6
SCALE IN FEET 1 : 60
0' 60' 120'
Equipment List For Areas Shown
Pole Luminaires

QTY LOCATION SIZE GRADE

ELEVATION

ABOVE GRADE

LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
OTHER
GRIDS
1 S6 80' - 80.2' TLC-LED-1200 8 0 8

80.2' TLC-LED-900 2* 2 0
20' CREE OSQ 1 0 1
1 Totals 11 2 9
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
Wayne Makin Shearer Sports Complex
Norco, CA
Grid Summary
Name Soccer Parking
Size 400' x 80'
Spacing 10.0' x 10.0'
Height 3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average 5.9
Maximum 16
Minimum 0
Avg/Min 2336.02
Max/Min 6557.19
UG (adjacent pts) 48.42
CU 0.67
No. of Points 222

LUMINAIRE INFORMATION
Applied Circuits O
No. of Luminaires 2
Total Load 1.78 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.

Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.

Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.

Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locations.

Page 340 of 628 ends

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports ENGINEERED DESIGN By: C.Hensley • File #142916Gr1-Prod-R2 • 19-Jan-24 LighƟng, LLC. ©1981, 2023 Musco Sports LighƟng, LLC.

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.1

0.1 0.0

0.0 0.0

0.0 0.0

0.1 0.1

0.1 0.1

0.1 0.0

0.0 0.0

0.1 0.1

0.1 0.1

0.1 0.2

0.2 0.2

0.0 0.0

0.1 0.1

0.1 0.2

0.2 0.2

0.3 0.3

0.3 0.3

0.0 0.1

0.1 0.1

0.2 0.2

0.3 0.4

0.4 0.4

0.4 0.4

0.4 0.0

0.1 0.1

0.2 0.2

0.2 0.3

0.5 0.6

0.6 0.6

0.6 0.6

0.5 0.5

0.0 0.1

0.1 0.2

0.3 0.4

0.5 0.6

0.8 0.9

1.0 0.9

0.9 0.8

0.7 0.6

0.1 0.1

0.1 0.2

0.3 0.5

0.7 0.8

1.1 1.2

1.4 1.4

1.3 1.2

1.1 0.9

0.7 0.1

0.1 0.2

0.3 0.4

0.7 0.9

1.1 1.3

1.6 1.8

2.0 2.1

2.0 1.7

1.4 1.0

0.7 0.4

0.1 0.1

0.2 0.4

0.5 0.8

1.1 1.3

1.6 1.9

2.3 2.8

3.2 3.2

3.0 2.4

1.7 1.2

0.8 0.4

0.1 0.2

0.3 0.4

0.6 0.9

1.2 1.6

2.0 2.3

2.8 3.6

4.3 4.8

4.9 4.1

2.9 2.0

1.4 0.9

0.4 0.1

0.2 0.3

0.4 0.6

0.9 1.3

1.9 2.5

3.0 3.7

4.6 5.7

6.4 6.6

6.1 4.8

3.4 2.3

1.6 0.9

0.1 0.2

0.3 0.4

0.6 0.9

1.4 2.1

3.1 3.9

4.9 6.0

7.4 8.4

8.6 8.5

8.1 6.2

4.0 2.8

1.6 0.1

0.2 0.2

0.4 0.6

0.9 1.3

2.2 3.5

4.7 6.2

7.6 9.0

10.1 10.0

10.4 10.9

9.9 6.9

4.7 2.8

0.1 0.1

0.2 0.3

0.5 0.8

1.3 2.2

3.7 5.1

6.8 8.7

9.9 9.2

8.5 11.2

13.5 12.0

9.0 6.3

4.0 5.1

10.9 15.2

13.1 9.4

6.5 4.5

2.9 9.2

15.0 13.8

10.2 7.2

4.8 136'
33'
232'78'
217'
B10
P1
SCALE IN FEET 1 : 40
0' 40' 80'
Equipment List For Areas Shown
Pole Luminaires

QTY LOCATION SIZE GRADE

ELEVATION

ABOVE GRADE

LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
OTHER
GRIDS
1 A2 70' - 71.0' TLC-LED-1200 4 0 4

71.0' TLC-LED-400 2* 2 0

15.5' TLC-BT-575 1 0 1
1 B2 80' - 80.2' TLC-LED-1500 7 0 7

80.2' TLC-LED-400 2* 2 0

15.5' TLC-BT-575 1 0 1
1 B10 60' - 60.2' TLC-LED-1200 3 0 3
40' TLC-LED-400 2 2 0

15.5' TLC-BT-575 1 0 1
10 P1-P10 20' 2' 22' CREE OSQ 1 1 0
10 P11-P20 20' 2' 22' CREE OSQ 1/1* 2 0
23 Totals 53 36 17
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
Wayne Makin Shearer Sports Complex
Norco, CA
Grid Summary
Name West Parking
Size 170' x 210'
Spacing 10.0' x 10.0'
Height 3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average 2.3
Maximum 15
Minimum 0
Avg/Min 15190.79
Max/Min 99447.09
UG (adjacent pts) 15.10
CU 0.08
No. of Points 261

LUMINAIRE INFORMATION
Applied Circuits M
No. of Luminaires 36
Total Load 5.52 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.

Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.

Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.

Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locations.

Page 341 of 628 ends
← All documents from this meeting