924 KB
Text extracted from the city's file for reading and search. Open the original on norwalk.primegov.com. That file is the official record.

March 18, 2024
City of Norwalk
Submitted on PlanetBids

Page 1 ends

Proposal

CONSTRUCTION MANAGEMENT SERVICES
PROJ. NO. 7359, HERMOSILLO PARK PROJECT AND PROJ. NO. 7607, REHABILITATION, STORMWATER CAPTURE AND INFILTRATION PROJECT RFP NO. 24-764

Revised Fee Proposal

CONSTRUCTION

MANAGEMENT

SERVICES

PROJECT NO. 7359, HERMOSILLO PARK PROJECT

AND

PROJECT NO. 7607, REHABILITATION,

STORMWATER CAPTURE AND

INFILTRATION

PROJECT

RFP NO. 24-764
Submitted To
City of NORWALK

Att: Mr. Mario Mera, Engineering Division Manager
Public Services Department – Engineering Division
Submitted via email to: [email protected]
Submitted By
TRANSTECH Engineers, Inc.

Contact Person for this Proposal:

Okan Demirci, PE, QSD, QSP
Principal
E: [email protected]
C: 714-319-6137
O: 909-595-8599
www.transtech.org
855.595.2495 (toll-free)
Attachment 1

www.transtech.org
855.595.2495 (toll-free)
About Transtech Video
Highlight:

CLICK HERE

May 13, 2024

City of Norwalk
Att: Mr. Mario Mera, Engineering Division Manager
Public Services Department – Engineering Division
Submitted via email to: [email protected]

Revised Fee Proposal, Construction Management Services
PROJECT NO. 7359, HERMOSILLO PARK PROJECT AND
PROJECT NO. 7607, REHABILITATION, STORMWATER CAPTURE AND INFILTRATION PROJECT RFP NO. 24-764

Dear Mr. Mera,

As requested, please see attached revised fee proposal.

Thank you for the opportunity to submit this proposal. Should you have any questions, or require additional information, please contact the undersigned.

Sincerely,

Okan Demirci, PE, MBA, QSD/P, Principal
E: [email protected]; C: 714-319-6137
Attachment 1

Table of Contents

CONSTRUCTION MANAGEMENT SERVICES
PROJECT NO. 7359, HERMOSILLO PARK, PROJECT. NO. 7607, REHABILITATION, STORMWATER CAPTURE AND INFILTRATION RFP NO. 24-764
Our Proposal is formatted per Sections included in RFP Section 7. EVALUATION CRITERIA as listed below, and per Addendum 1. Item 2, which states: “ Limit proposal to 10 pages not including appendices, exhibits, resumes, past projects”.

Section Page

1. Understanding of the Project Requirements (included in 10-page proposal limit) 1-4

2. Proposed Scope of Work (included in 10-page proposal limit) 5-8

2.a. Understanding of Scope of Work (included in 10-page proposal limit) 5

2.b. Approach (included in 10-page proposal limit) 6

3. Experience of Firm and Personnel 9-19

3.a. Company Qualifications (included in 10-page proposal limit) 9-10

3.b. Staff Qualifications/Resumes (Per Addendum 1, excluded from 10-page proposal limit) 11-19

4. Past Performance 20-26

4.a. Similar Projects Experience (Per Addendum 1, excluded from 10-page proposal limit) 20

4.b. References (Per Addendum 1, excluded from 10-page proposal limit) 26

5. Costs (per Addendum 1. Item 4, Fee is submitted separately) 27.A-27.E

Appendix (per Addendum 1, excluded from 10-page proposal limit) 28-30 a. Insurance (per Addendum 1, excluded from 10-page proposal limit) 28 b. Addendum 1 Acknowledgement (per Addendum 1, excluded from 10-page proposal limit) 29

Attachment 1

CONSTRUCTION MANAGEMENT SERVICES
PROJECT NO. 7359, HERMOSILLO PARK, PROJECT. NO. 7607, REHABILITATION, STORMWATER CAPTURE AND INFILTRATION RFP NO. 24-764
Fee Proposal 27.A

5. Costs (per Addendum 1. Item 4, Fee is submitted separately)

Principal, Sr. Project
Management,
Technical Support
Staff
PM/CM Staff
Inspection Staff
Office Engineering
Staff, PM/CM/CI/RE
Support Staff
$220 $220 $175 $160
200 200 400 200 1,000 $120,400
880 1,760 3,520 3,520 9,680 $1,147,520
20 264 264 792 528 1,848 $201,432
6 1,344 2,224 4,712 4,248 12,528
$295,680 $489,280 $824,600 $679,680 $1,469,352
$180,000
$1,649,352
$20,000

3. Services related to work involved Project Close
Out Activities, Note 2:

ESTIMATED FEE
Total Hours
Total Fees

CONSTRUCTION MANAGEMENT SERVICES
PROJECT NO. 7359, HERMOSILLO PARK, PROJECT. NO. 7607,

REHABILITATION, STORMWATER CAPTURE AND INFILTRATION
RFP NO. 24-764
Hourly Rates (Rates are average)

1. Services related to work involved in Note 1.

JANUARY 16, 2024 CITY COUNCIL MEETING, CONTRACT AWARD TO REYES CONSTRUCTION:

Award of Design-Build Contract Phase-1: $2,660,668 Authorize Phase 2 Budget for Design and Site Grading $4,730,637 (Note by TT: For Site Grading Work/Field Construction, which will require on-site inspector, 4 months is assumed for budget purposes)
Contingency 15%: $1,108,695 Total $8,500,000 Recommended Action:

Staff recommends City Council award a Design-Build agreement to Reyes Construction, Inc. to provide Design-Build services for Project No. 7359 – Hermosillo Park Rehabilitation and Project No. 7607 – Stormwater and Infiltration Project in the amount of $7,391,305 with up to 15% contingency in the amount of $1,108,695 if necessary; and authorize the City Manager to execute the agreement and any amendments within the 15% contingency, on behalf of the City, in a form approved by the City Attorney.

Services related to Construction activities.
(THE CITY ISUED ADDENDUM No. 1 (dated October 20, 2023) for THE “PROGRESSIVE DESIGN-BUILD PROCUREMENT, RFQUAL NO. 24-748, WHICH PROVIDED FOLLOWING CLARIFICATION RE PROJECT COMPLETION: PHASED SERVICES: Design-Builder should schedule substantial completion by December 31, 2027 months assumed (excluding construction/grading work involved in Services related to work involved in Note 1

2. Services related to Construction activities.

Optional Budget Allocation for: Sub-Consultant: AVANT GARDE, Inc. (DBE/WBE Firm) Prop 68/Measure A/Measure W Grant Program Management Services (THE CITY ISSUED ADDENDUM No. 1 (dated October 20, 2023) for THE “PROGRESSIVE DESIGN-BUILD PROCUREMENT, RFQUAL NO. 24-748, WHICH PROVIDED FOLLOWING CLARIFICATION RE PROJECT COMPLETION: PHASED SERVICES: Project close out will require 6 months schedule. months assumed total for both projects combined
Above level of effort, durations and staff classifications and their hourly rates are average, and may be shifted/re-allocated between staff and tasks as necessary depending on actual work progress and needs. Staff hourly rates shown are average rates for the classification(s) sown and invoicing is based on actual staff member's hourly rate.

Per RFP Section "7. EVALUTION CRITAERIA, Sub-section Costs", billing shall be based on time and materials.

Plus Budget Allocation for: Sub-Consultant: AVANT GARDE, Inc. (DBE/WBE Firm) Labor Compliance Services
Total Estimated Hours
Subtotal Transtech Fees
Total Estimated Fees

Attachment 1

CONSTRUCTION MANAGEMENT SERVICES
PROJECT NO. 7359, HERMOSILLO PARK, PROJECT. NO. 7607, REHABILITATION, STORMWATER CAPTURE AND INFILTRATION RFP NO. 24-764
Fee Proposal 27.B
• Above level of effort, durations and staff classifications and their hourly rates are average, and may be shifted/re-allocated between staff and tasks as necessary depending on actual work progress and needs.

Staff hourly rates shown are average rates for the classification(s) sown and invoicing is based on actual staff member's hourly rate.
• Per RFP Section "7. EVALUTION CRITAERIA, Sub -section Costs", billing shall be based on time and materials.

Also, as required in this RFP Section, billable hourly rates for the job description are provided above . • Above estimates are based on various assumptions. We will appreciate an opportunity to go over these assumptions, make any adjustments based on City’s input, and adjust/finalize our budget as necessary to provide the City our services in an efficient and cost-effective manner.

FOLLOWING INFORMATION WAS USED IN DEVELOPING ESTIMATED PROJECT FEE:

Note 1:

JANUARY 16, 2024 CITY COUNCIL MEETING, CONTRACT AWARD TO REYES CONSTRUCTION:

At the January 16, 2024 City Council Meeting, the City recently awarded a contract to Reyes Construction to provide Design-Build (Progressive) Services for Hermosillo Park Rehabilitation, Stormwater Capture and Infiltration Project (City Project Nos. 7607, 7359) as follows:

Background:
…
The contract execution for the PROJECT will consist of a cost plus fee agreement to provide for Phase 1 design development up to 65% design, and a subsequent final design and construction agreement with a Guaranteed Maximum Price (GMP) proposal from RCI.

At this time, RCI submitted a cost proposal of $2,660,668 for the Phase 1 design of the project to provide 65% design to support a GMP for final design and construction of the PROJECT.

Proposition 68 grant fund requirement for project completion by end of 2026 constrains the project schedule requiring the acceleration of grading design and completion of project site grading. To accommodate the grading schedule acceleration, approval of $4,730,637 budget for Phase 2 of the project is requested in conjunction with the approval of the Design-Build contract award.

Fiscal Impact:

Phase 1 of this Design-Build contract includes design development up to 65% design and development of a Guaranteed Maximum Price (GMP) proposal for construction. Phase 2 includes completion of design and site grading. The City has available grant proceeds of Measure W and Proposition 68 monies for the implementation of these two Hermosillo Park Projects.

The City has been approved $20,000,000 under Measure W for the implementation of Project No. 7607 - STORMWATER CAPTURE AND INFILTRATION PROJECT of which $2,000,000 has been authorized for expenditure at this time to fund the procurement of design services. Also, the City has been approved $8,500,000 under Proposition 68 funds and has been authorized the full approved amount for the implementation of Project No. 7359 - HERMOSILLO PARK REHABILITATION:

Attachment 1

CONSTRUCTION MANAGEMENT SERVICES
PROJECT NO. 7359, HERMOSILLO PARK, PROJECT. NO. 7607, REHABILITATION, STORMWATER CAPTURE AND INFILTRATION RFP NO. 24-764
Fee Proposal 27.C
Award of Design-Build Contract Phase-1: $2,660,668
Authorize Phase 2 Budget for Design and Site Grading $4,730,637 Contingency 15%: $1,108,695
Total $8,500,000

Recommended Action:

Staff recommends City Council award a Design-Build agreement to Reyes Construction, Inc. to provide Design - Build services for Project No. 7359 – Hermosillo Park Rehabilitation and Project No. 7607 – Stormwater and Infiltration Project in the amount of $7,391,305 with up to 15% contingency in t he amount of $1,108,695 if necessary; and authorize the City Manager to execute the agreement and any amendments within the 15% contingency, on behalf of the City, in a form approved by the City Attorney.

PROJECT PHASING:

PROJECT PHASING IS DESCRIBED IN SECTION 1-BACKGROUND OF THE “PROGRESSIVE DESIGN -BUILD PROCUREMENT, RFQUAL NO. 24-748:

The project is to be designed and constructed in two phases using the progressive Design- Build delivery method:
• Phase 1: Prepare design to 65% complete, as defined in Appendix B (Scope of Design -Builder Services), and a guaranteed maximum (GMP) proposal. Prepare separate GMP for Hermosillo Park Rehabilitation (Project 7359), and Stormwater Capture and Infiltration Project (Project 7607). • Phase 2: Complete final design of mass grading plans, park recreational improvements plans, and complete construction of site grading for Stormwater Capture and Infiltration Project. Begin construction of park recreational improvements.
• Phase 3: Complete final design of Stormwater Capture and Infiltration plans, construction and post -construction tasks, including performance testing, startup commissioning, and operator training and support.

PROJECT SCHEDULE:

PROJECT SCHEDULE IS DESCRIBED IN SECTION 1-BACKGROUND OF THE “PROGRESSIVE DESIGN-BUILD PROCUREMENT, RFQUAL NO. 24-748:
• The cost for design and construction of the Project is currently budgeted at $26,450,000. The budget provides for all line-item work as described in the project scope.
• The City anticipates to execute the Progressive Design-Build Contract on or about December 19, 2023. • The design, permitting, construction and performance testing of the completed Project are expected to be completed no later than June 30, 2028.

THE CITY ISUED ADDENDUM No. 1 (dated October 20, 2023) for THE “PROGRESSIVE DESIGN -BUILD PROCUREMENT, RFQUAL NO. 24-748, WHICH PROVIDED FOLLOWING PHASED SERVICES:

2.2 Phased Services.

2.2.1 Phase 1 Services. Design -Builder shall perform the services of design, pricing, and other services for the Project based on Owner's Project Criteria, as may be revised in accordance with Section 2.1 hereof, as set forth in Appendix B through I to the RFQ, Scope of Services. Design -Builder shall perform complete design and preconstruction services as part of Phase 1. Design-Builder to establish the Contract Price for Phase 2, as set forth in Section 2.3 below. The Contract Price for Phase 2 shall be developed during Phase 1 on an “open -book” basis. Design -Builder’s Compensation for Phase 1 Services is set forth in Article 7 herein. The level of completion required for Phase 1 Services is defined in the RFQ, Scope of Services under Design Phase.

2.2.2 Phase 2 Services. Design -Builder shall perform the services of design, pricing, and other services for the Project based on Owner's Project Criteria, as may be revised in accordance with Section 2.1 hereof, as Attachment 1

CONSTRUCTION MANAGEMENT SERVICES
PROJECT NO. 7359, HERMOSILLO PARK, PROJECT. NO. 7607, REHABILITATION, STORMWATER CAPTURE AND INFILTRATION RFP NO. 24-764
Fee Proposal 27.D
set forth in Appendix B through I to the RFQ, Scope of Services. Design -Builder shall perform complete design and preconstruction services as part of Phase 2. Design-Builder to establish the Contract Price for Phase 3, as set forth in Section 2.3 below. The Contract Price for Phase 3 shall be developed during Phase 2 on an “open -book” basis. Design -Builder’s Compensation for Phase 2 Services is set forth in Article 7 herein. The level of completion required for Phase 2 Services is defined in the RFQ, Scope of Services under Design Phase.

2.2.3 Phase 3 Services. Design-Builder’s Phase 3 services shall consist of all services beyond Phase 2 including the procurement of all materials and equipment for the Project, the performance of construction services for the Project, the start -up, testing, and commissioning of the Project, and the provision of warranty services, all as further described in the Contract Price Amendment. Upon receipt of Design -Builder’s proposed Contract Price for Phase 3, Owner may proceed as set forth in Article 2.3.

Note 2:

THE CITY ISUED ADDENDUM No. 1 (dated October 20, 2023) for THE “PROGRESSIVE DESIGN -BUILD PROCUREMENT, RFQUAL NO. 24-748, WHICH PROVIDED FOLLOWING CLARIFICATION RE PROJECT COMPLETION: PHASED SERVICES:
• Construction completion date of June 30, 2028 is project completion date. Project completion is after project close out activities including inspection, testing, validation, and acceptance. • Project close out will require 6 months schedule.
• Design-Builder should schedule substantial completion by December 31, 2027.

Note 3:

THE CITY ISUED ADDENDUM No. 1 (dated October 20, 2023) FOR THE “PROGRESSIVE DESIGN -BUILD PROCUREMENT, RFQUAL NO. 24-748, WHICH INCLUDED FOLLOWING RELATED TO TESTS AND INSPECTIONS:

Article 7
Contract Price

7.5 Cost of the Work.

7.5.1 The term Cost of the Work shall mean costs reasonably incurred by Design -Builder in the proper performance of the Work. The Cost of the Work shall include only the following:

7.5.1.17 Costs for permits, royalties, licenses, tests and inspections incurred by Design -Builder as a requirement of the Contract Documents.

Further clarification was provided by the City on 5/13/24, indicating that the above subject services (including materials tests and inspections) will be provided by the design-built contractor. As requested by the City, Transtech’s proposal was revised to exclude materials testing and inspection services. Such services will be provided by the design-built contractor.

Note 4:

PROJECT FUNDING:

PER THE RFP, PROJECT FUNDING IS SPECIFIED AS FOLLOWS:
• The City received a State of California Proposition 68 grant for the rehabilitation of Hermosillo Park in the amount of $8.5 million.

Attachment 1

CONSTRUCTION MANAGEMENT SERVICES
PROJECT NO. 7359, HERMOSILLO PARK, PROJECT. NO. 7607, REHABILITATION, STORMWATER CAPTURE AND INFILTRATION RFP NO. 24-764
Fee Proposal 27.E
• The capital construction cost of the project recreation components is anticipated to be approximately $10.7M (including contingency).
• Measure A funds will be allocated to this project to fund the remaining balance of the project.

THE CITY IS SUED ADDENDUM No. 1 (dated October 20, 2023) for THE “PROGRESSIVE DESIGN -BUILD PROCUREMENT, RFQUAL NO. 24-748, WHICH PROVIDED FOLLOWING PHASED SERVICES:

2.3 Proposal. Upon completion of the Design Development documents and any other Basis of Design documents upon which the parties may agree, Design -Builder shall submit a proposal to Owner (the "Proposal") for the completion of the construction for the Project for the Contract Price, which shall be based on Design-Builder’s Fee and Cost of the Work with a Guaranteed Maximum Price (GMP). The cost for Phase 1 and Phase 2 services plus the Contract Price for Phase 3 services, including all contingencies and all owances, shall not exceed the Stipulated Sum of $28,857,835.

Further clarification was provided by the City on 5/13/24, indicating that the project funding sources include Prop 68, Measure A and Measure W funds (no federal funds are included). As requested by the City, Transtech provided fees for Labor Compliance Services for all phases of the project (services provided by subconsultant: Avant Garde).

Furthermore, the City requested optional services to provide Prop 68/Measure A/Measure W Grant Program Management Services. As requested by the City, Transtech provided fees for the requested optional services (services provided by subconsultant: Avant Garde).