Cities Index.
Attachment 1 - Hermosillo Final Design Fee Proposal

Norwalk City Council
April 15, 2025

Document
Attachment 1 - Hermosillo Final Design Fee Proposal
Meeting
April 15, 2025
Body
Norwalk City Council
Original file
62 KB
Text extracted from the city's file for reading and search. Open the original on norwalk.primegov.com. That file is the official record.

Project
Manager
Project
Engineer
Chief
Estimator Estimator Superintendent
$ 186.00 $ 137.00 $ 201.00 $ 141.00 $ 206.00 Willdan GHD

1. Project Administration and Coordination
Kickoff Meeting 0 -$ 2,324.00$ 288.00$ 2,742.60$ Coordination (Project Management) 256 256 47,616.00$ 20,650.00$ 41,887.00$ 119,946.09$ Monthly Meetings 40 40 80 12,920.00$ 12,944.00$ 23,136.00$ 52,612.80$ Design QA/QC 0 -$ 15,264.00$ 16,027.20$ Constructability Reviews 80 80 80 80 320 58,400.00$ 1,824.00$ 68,491.20$ Project Administration and Coordination SUBTOTAL: 376 120 80 0 80 656 118,936.00$ 53,006.00$ 65,311.00$ 259,819.89$

2. Data Collection and Field Surveys
Utility Research and Coordination 0 -$ 1,360.00$ 1,428.00$ Utility Notices (Up to 3 per Agency) 0 -$ 1,336.00$ 966.00$ 2,417.10$ DigAlert/USA Markout/Notifications 0 -$ -$ Site Reconnaissance 0 -$ 5,026.00$ 5,277.30$ Data Collection and Field Surveys SUBTOTAL: 0 0 0 0 0 0 -$ 7,722.00$ 966.00$ 9,122.40$

3. Civil Engineering
Civil General -$
Review Preliminary Design Report 0 -$ -$ As-Built Drawing Coordination Horizontal and Vertical Control Plan 0 -$ 947.00$ 994.35$ Civil Engineering SUBTOTAL: 0 0 0 0 0 0 -$ 947.00$ -$ 994.35$

4. Geotechnical Report Including Agronomic Soil Analysis Review Preliminary Infiltration Investigation Report 0 -$ -$ Underground Utilities Survey 0 -$ -$
Geotechnical Report (Including Agronomic Soil Analysis) 0 -$ -$ Water Quality Sampling/Testing (Groundwater, If Required) 0 -$ -$ Geotechnical Report Including Agronomic Soil Analysis SUBTOTAL: 0 0 0 0 0 0 -$ -$ -$ -$

5. Landscape/Architectural
Understand applicable laws and codes 0 -$ -$ Public Services and Recreation and Park Services Dept Meetings (up to 2)/Coordination 0 -$ -$ Site Visits (up to 2) 0 -$ -$
Budget Estimates (Park Improvements) 0 -$ -$ Landscape/Architectural SUBTOTAL: 0 0 0 0 0 0 -$ -$ -$ -$

6. Engineering Survey
Topographical Design Survey 0 -$ -$
Engineering Survey SUBTOTAL: 0 0 0 0 0 0 -$ -$ -$ -$

7. Utility Document, ROW, and Utility Research
Assess if additional research is required 0 -$ -$ GPR Investigation 0 -$ -$
Utility Potholing 0 -$ -$
Utility Investigation Report 0 -$ -$
Utility Document, ROW, and Utility Research SUBTOTAL: 0 0 0 0 0 0 -$ -$ -$ -$

8. Environmental Documentation
Support City preparation of MND pursuant to CEQA 8 8 1,488.00$ 1,696.32$ Review Preliminary Design Report 0 -$ 3,300.00$ 3,465.00$ PHASE 2/3 FEE
Task
Total
Hours
RCI Labor
Subtotal
($)
Designer Fees
Total Fee (Inc. Markup)
Hydrologic and Hydraulic Analyses 0 -$ -$ Environmental Documentation SUBTOTAL: 8 0 0 0 0 8 1,488.00$ 3,300.00$ -$ 5,161.32$

9. Plans, Specifications and Engineer's Estimates
Construction Plans
Title Sheet 0 -$ 771.00$ 809.55$ Plan Sheets 0 -$ 25,703.00$ 26,988.15$ General Notes Sheet 0 -$ 410.00$ 430.50$ Accessibility/ADA Detail 0 -$ -$
Survey (Horizontal/Vertical) Control Plan 0 -$ 1,086.00$ 1,140.30$ Site Plan-Above Ground Features 0 -$ 1,462.00$ 1,535.10$ Site Utility Plan 0 -$ 3,160.00$ 3,318.00$ Demolition Plan 0 -$ 1,324.00$ 1,390.20$ Grading, Erosion, and On-Site Drainage Plan 0 -$ 7,722.00$ 8,108.10$ Water Quality Management Plan 0 -$ 7,070.00$ 7,423.50$ Water Quality Control Drawings/BMPs 0 -$ -$ Park Monument Signage 0 -$ 4,124.00$ 4,330.20$ Landscape Design Development Plan 0 -$ 14,226.00$ 14,937.30$ Sports Courts, Splash Pad, Site Amenities & Playground Plan 0 -$ 27,442.00$ 28,814.10$ Landscape (Irrigation and Planting) Plan 0 -$ 35,270.00$ 37,033.50$ Signing, Striping Plans 0 -$ 3,982.00$ 4,181.10$ Restroom Plan 0 -$ 476.00$ 499.80$ Community Center Architectural Plans 0 -$ 4,584.00$ 116,711.00$ 127,359.75$ Structural Engineering (Community Center Building - Phase 2) 0 -$ 18,949.00$ 19,896.45$ Structural Plan 0 -$ 454.00$ 476.70$ Stormwater Structural Plans 0 -$ 13,817.00$ 14,507.85$ Park Site Electrical Plans 0 -$ 11,400.00$ 11,970.00$ Plumbing Plan 0 -$ 454.00$ 476.70$ Stormwater Electrical Plans 0 -$ 24,520.00$ 25,746.00$ Stormwater Civil/Mechanical Plans 0 -$ 454.00$ 64,328.00$ 68,021.10$ Construction Plans SUBTOTAL: 0 0 0 0 0 0 -$ 151,574.00$ 238,325.00$ 409,393.95$ Design Analyses
Hydrologic and Hydraulic Analyses 0 -$ -$ Stormwater Capture and WQ analysis 0 -$ -$ Support analysis WMMS2 and SUSTAIN 0 -$ -$ Water Conservation Analysis/Annual Recharge Volume 0 -$ -$ Review SD Systems and assess flooding areas 0 -$ -$ Review City facilities near reservoir and assess project's impact 0 -$ -$ Design Analysis SUBTOTAL: 0 0 0 0 0 0 -$ -$ -$ -$ Permitting Requirements
Temp Traffic Control Plans (Utility Potholing, Geotechnical Investigation, etc.) 4 8 12 1,840.00$ 2,097.60$ SCE Permit 4 8 12 1,840.00$ 1,443.00$ 13,819.00$ 18,122.70$ LACounty Flood Control Permit(s) 4 8 12 1,840.00$ 1,719.00$ 19,902.00$ 24,799.65$ City Permit(s) 4 8 12 1,840.00$ 1,443.00$ 17,733.00$ 22,232.40$ Permitting Requirements SUBTOTAL: 16 32 0 0 0 36 7,360.00$ 4,605.00$ 51,454.00$ 67,252.35$ Presentations/Community Outreach
Miscellaneous Presentations CC, SCW, etc. (up to 4 meetings) 16 16 32 5,168.00$ 5,891.52$ Community Outreach Plan and Meetings 16 16 32 5,168.00$ 2,592.00$ 66,118.00$ 78,037.02$ Presentations/Community Outreach SUBTOTAL: 32 32 0 0 0 64 10,336.00$ 2,592.00$ 66,118.00$ 83,928.54$ Engineering Cost Estimates
35% Estimate 0 -$ -$
65% Estimate 0 -$ -$
90% Estimate 0 -$ 10,330.00$ 10,846.50$ 100% Estimate 0 -$ 5,673.00$ 5,956.65$ Estimates SUBTOTAL: 0 0 0 0 0 0 -$ 16,003.00$ -$ 16,803.15$ Specifications
Civil Spec/Detail 0 -$ 934.00$ 980.70$ Accessibility Spec/ADA Detail 0 -$ 153.00$ 160.65$ Parking Lot Spec/Detail 0 -$ 502.00$ 527.10$ Sports Courts, Splash Pad, Site Amenities & Playground Specs 0 -$ 1,190.00$ 1,249.50$ Community Center Building Specs 0 -$ 9,182.00$ 9,641.10$ 65% Specifications 0 -$ -$
90% Specifications 40 40 7,440.00$ 17,222.00$ 13,000.00$ 40,214.70$ 100% Specifications 40 40 7,440.00$ 8,201.00$ 4,430.00$ 21,744.15$ Specifications SUBTOTAL: 80 0 0 0 0 80 14,880.00$ 28,202.00$ 26,612.00$ 74,517.90$ Submittals
15% Concept Design Submittal 0 -$ -$
35% Design Development Submittal 0 -$ -$ 65% Design Development Submittal 0 -$ -$ 95% Design Submittal 8 8 16 2,584.00$ 5,424.00$ 8,640.96$ 100% (Final) Design Submittal 8 8 16 2,584.00$ 5,424.00$ 8,640.96$ O&M Manuals 8 8 16 2,584.00$ 40,910.00$ 45,901.26$ Post Construction Monitoring Plan 8 8 16 2,584.00$ 17,388.00$ 21,203.16$ Submittals SUBTOTAL: 32 32 0 0 0 64 10,336.00$ -$ 69,146.00$ 84,386.34$ Plans, Specifications and Engineer's Estimate SUBTOTAL: 160 96 0 0 0 244 42,912.00$ 202,976.00$ 451,655.00$ 736,282.23$ Construction Cost Estimates
15% Concept Design 0 -$ -$
35% Design Development 0 -$ -$
65% Design Development 0 -$ -$
Prepare GMP for Phase 2 & 3 0 -$ -$
90% Estimate 16 40 40 40 136 22,136.00$ 25,235.04$ 100% (Final) Estimate 16 40 40 40 136 22,136.00$ 25,235.04$ Cost Estimates SUBTOTAL: 32 80 80 80 0 272 44,272.00$ -$ -$ 50,470.08$ TOTAL: 576 296 160 80 80 1180 207,608.00 $ 267,951.00 $ 517,932.00 $ 1,061,850.27 $ 53,092.51$
1,114,942.78$
Contingency (5%):

PHASE 2/3 Design Services: