City of Norwalk June 17 th, 2025
Attn: Run Chen, Principal Civil Engineer
12700 Norwalk Boulevard, Norwalk, CA 90650
Subject: cARMeNItA ROAD ReHAbILItAtION FROM eXceLSIOR DRIVe tO ROSecRANS AVeNue, PROject NO. 7184 Thank you for the opportunity to submit our proposal for the Carmenita Road Rehabilitation Project . This project entails the pavement rehabilitation, ADA curb ramps, sidewalk improvements, utility coordination, and geotechnical investigations along Carmenita Road from Excelsior Drive to Rosecrans Avenue. We took this RFP seriously from the outset, and our approach reflects that. Rather than simply responding to the scope, we took a step back to think about what success would really look like for the City of Norwalk, and how we could help get there.

That meant starting with a understanding of the schedule, the submittal structure, and the funding constraints.

We reached out with questions, explored ways to streamline tasks, and proposed ideas to give the City more breathing room without compromising on quality. We weren’t just trying to check boxes and submit; we were trying to make sure that if we took this project on, we would be able to exceed your expectations. That is what we always aim to do at Onward Engineering .

But before we get into the team, it’s important to mention that roadway design isn’t just one of the services we provide, it is our bread and butter (over 90% of our work). We have managed the design of hundreds of miles of roadway rehabilitation projects across Southern California. In La Mirada, we’ve delivered over 26 miles of improvements through multiple phases of their Residential Street Rehabilitation Program. In the City of Diamond Bar, our work spans over 65 miles of roadway across seven consecutive years. In the City of Placentia, we’ve covered nearly 45% of the City’s roadway network. We’ve also completed street design projects in Montebello (five major street segments), Eastvale ( 3.9 million square feet of slurry seal), Downey (Areas 1, 2, and 4 totaling about 30 miles), Glendale ( 10 miles), Torrance ( 6 miles), La Habra, ( 15 miles across two phases), Alhambra, Stanton, Anaheim, Hesperia and San Bernardino ( 4 miles each), and have also contributed to major ADA improvement efforts, including 1,000 ADA ramps for the City of Long Beach and 292 ramps for the City of Rancho Cucamonga. We’ve also recently wrapped up major arterial design projects in Fountain Valley and Lynwood. Not to mention our design work for the City of Norwalk itself, as well as extensive construction management and inspection support on multiple City projects.

Our Project Manager, Chino Consunji , is someone the City of Norwalk already knows. He’s previously served as Construction Manager for Norwalk on multiple projects, and he understands your expectations inside and out. That background gives him a unique appreciation for how design decisions on paper play out in the field. As a former City Engineer and Public Works Director, he’s also attuned to the funding realities and schedule pressures that public agencies navigate every day. Supporting him is Joe Dyer , who leads our quality control efforts. Joe’s experience spans over four decades, and his thoughtful, methodical review process ensures a tight, constructible PS&E set. Ryan Dennis , our Lead Engineer, brings over 17 years of focused design experience and is highly skilled in AutoCAD Civil 3D. His ability to develop precise, well-organized construction documents within tight timelines is a key reason our projects stay on schedule and move smoothly through review. The team proposed for this work is not overcommitted elsewhere, and that was intentional. We understand that delivering on a compressed schedule requires availability, responsiveness, and clear communication, so you will get that in spades with our proposed team.

To help keep things on track, we’ll be using ClickUp to manage task assignments, schedules, and status updates.

This tool allows us to give your team direct visibility into progress, deadlines, and any open items. It also helps us keep internal reviews tight and transparent. More importantly, our communication style is straightforward, responsive, and collaborative.

We appreciate the trust the City places in its consultants, and we don’t take that lightly. If selected, we’ll bring the same level of thoughtfulness, reliability, and follow-through that you’ve seen from us before. If you have any questions, or would like any additional information, please feel free to contact me any time at (714) 533-3050, or by email at: [email protected]. Thank you again for the opportunity to be considered. We’re ready to get to work.

Thank you,
Muhammad Ataya, MPA
President, Onward Engineering
Onward Engineering
300 S. Harbor Blvd., Suite 814
Anaheim, CA 92805
(714) 533.3050 | www.oe-eng.com
Cover Page
Onward Engineering | Design Smarter. Build Better.

Request For Proposal, for the City of Norwalk,
Carmenita Road Rehabilitation, Project No. 7184
| 1
OVeR LetteRc

06/17/2025

jOe DYeR - Pe, te
bsce: Civil Engineering, Ohio State University
Ms & phd progra M: Virginia Polytechnic
Institute & State University, Virginia
pe: Professional Engineer, #31626
Te: Registered Traffic Engineer, #1200
ForMer City Engineer in Glendora and
Assistant Director of Public Works/Assistant
City Engineer in Chino Hills
LeAD PROject eNGINeeR
Sub-cONSuLtANtS
PROject MANAGeRQA/Qc MANAGeR
PROject eNGINeeRS
NOTE: OE will make available key personnel to the
extent proposed and for the duration of the required
services. No person designated as “key” shall be
removed or replaced without the prior written
concurrence of the City.

DeLFINO “cHINO” cONSuNjI - Pe
bs: Civil Engineering
pe: Professional Engineer, #57908
Former City Engineer/Director of Public
Works: Downey, West Covina, Brea, Norwalk
DAYtON LOWe
ocTa: (prior) CERTIFIED :

Pavement Assessment,
Rehabilitation & Recommendations
coUrses: Construction Management,
Technology, & Civil Engineering,
- Broward College
Tech: AutoCAD & Civil 3D
YASH GuPtA
bT: Civil Engineering,
-Rajasthan T ech. University
MT: Transportation, MNIT, Jaipur
Tech : Civil 3D; AutoDesk Vehicle Track;
PDS Line/Sign; AutoCAD; WaterGEMS;
EPANET ; STAAD; 3D Max
RYAN DeNNIS - P. eNG.
bs: Civil Engineering,
-University of Calgary, 2005
MIN or: Environmental Engineering,
-University of Calgary, 2005
p. eNg.: Professional Engineer (Canada)
Tech: AutoCAD & Civil 3D

DAVID LORIA
as: Computer Animation,
-Brooks College, Long Beach
cerTIFIed: AutoCAD Certified Professional
Tech : Civil 3D, Revit, 3D Max, Recap, Scan
Master point cloud processing software
AbI SINGH
bTech : Civil Engineering,
-Bharati Vidyapeeth University, 2020
Tech : AutoCAD Civil 3D, MS Office
PAVAN POHeKAR
be: Civil Engineering, Institute of
T echnology & Research, Amravati
MT: Structures, VIIT, Pune
Tech: Civil 3D; AutoCAD; ProjectWise; HECRAS.

WIKKI VIKAS
bT: Civil Engineering, VSIT , Hyderabad
MT: Transportation, VNIT, Nagpur
Tech : Civil 3D; MX Roads/OpenRoads;
AutoCAD; MicroStation; Auto TURN/
AutoTrack; SewerGEMS;Infraworks

OMAR NAHHAS
edU: AS – Drafting & CAD,
South West Tennessee CC
exp: 30+ yrs – Civil 3D design for water,
remediation, infrastructure
Tech: Civil 3D; Navisworks; AutoTURN;
Plex Earth; Bluebeam; ProjectWise
NOORZAYGeO, INc.

MaihaN Noorzay, Ms, pe, ge
Principal Engineer
•(951) 264-9023 | [email protected]
•16817 Rainy Vale Avenue, Riverside, CA 92503
NoorzayGeoNoorzayGeo
Geotech Investigation & Testing
Organizational Chart
Onward Engineering | Design Smarter. Build Better.

Request For Proposal, for the City of Norwalk,
Carmenita Road Rehabilitation, Project No. 7184
| 5
RGANiZAtiONAL cHARtO
Qa/Qc MaNager
jOe DYeR, Pe, te
Fields oF experTise:
experieNce
45 Ye ARS OF

SIGNAL TRAFFICPAVEMENT WATERROADWAY
QUalIFIcaTIoNs
• BSCE: Civil Engineering, Ohio State University, Ohio • MS & PhD Program: Virginia Polytechnic Institute & State University, Virginia • PE #31626: Registered Civil Engineer - TE #1200: Registered Traffic Engineer • Certificate: Certified in Building & Facility Maintenance, 2005 backgroUNd
Joe Dyer has achieved a milestone of 45 years of expansive experience serving a number of Southern California Cities including Chino Hills, Glendora, Bell Gardens and Whittier, along with work as a Junior Civil Engineer for the California Department of Transportation. His role on a litany of CIP projects involved working as a Transportation Planner, Senior Engineer, City Traffic Engineer, and as The Director of Public Works. In over 4 decades worth of time serving, he has perfected his skills in disciplines involving street maintenance and rehabilitation, water and storm drains, parks and public facilities, bridges, transit, sewer, design engineering, contract administration, residential development, environmental litigation, and federal regulations compliance, among many other disciplines and project variations.

Joe additionally has great familiarity in coordinating with City officials and councils, utility owners, and has served as liason between stakeholders and governing bodies. Joe has worked with several developers, engineers, and City Councils, becoming well established in advocating for a City’s best interest. experIeNce
MIra loMa/agaTe/graNITe hIll srTs proJecTs (cIp 23108/23109/23110), JUrUpa Valley Joe provided QA/QC services for the City of Jurupa Valley for 3 Safe Routes to Schools (SRTS) projects, which included the Mira Loma Area SRTS Sidewalk Gap Closure Project at 15,680 ft long; the Granite Hill Area SRTS Sidewalk Gap Closure Project at 10,370 ft; and the Agate Street Complete Streets Project at 2,350 ft long, totaling approximately 28,400 linear feet (or 5.4 miles) of safety and sidewalk improvements. Design components included pavement repairs; curb, gutter and sidewalk; signing and striping; ADA curb ramp and driveway construction; pedestrian safety improvements; and storm drain improvements which required curb opening catch basin inlet elevation adjustments and relocation and alignment with the new gutters, culvert abandonment and surface runoff rediverting, followed by developing a Water Quality Management Plan for the City. Additionally, utility appurtenances, adjustments and relocations were extensive, involving trees, street signs, manholes, fire hydrants, fences, mailboxes, pipeline risers, vaults, utility cabinets and poles, gas and water meters, curbs, driveways, and safety bollards, with third party utility owners such as SCE requiring long lead times for relocations. Impacted utility owners were engaged early in the design process for coordination when the responsibility to relocate fell on the utility owner.

OE also performed a Topographic Survey.
soQUel caNyoN parkWay paVeMeNT rehab IlITaTIoN, chINo hIlls Joe provided plan, design and construction administration for Soquel Canyon Parkway Pavement Rehabilitation Project.

Joes work included grind and AC overlay, striping, and bike lane installation from Pipeline Avenue to the North City limit.

This project was performed in two phases, where Joe also coordinated with Caltrans at its on-off ramps areas. rock sprINgs drIVe paVeMeNT rehab IlITaTIoN, chINo hIlls Joe provided plan, design, and contract administration for the pavement rehabilitation of Rock Springs Drive. The project work included pavement removal and reconstruction, adjusting utility facilities, reconstruction of ADA ramps and traffic striping.

WoodVIeW road paVeMeNT rehab IlITaTIoN (phase I & phase II), chINo hIlls Joe provided plan, design, and contract administration to repave Woodview Road from Pipeline Avenue to Peyton Drive for this pavement rehabilitation project. The work included traffic striping improvements, pavement removal and reconstruction, adjusting utility facilities, reconstruction of ADA ramps and traffic striping and signage.

Resumes
Onward Engineering | Design Smarter. Build Better.

Request For Proposal, for the City of Norwalk,
Carmenita Road Rehabilitation, Project No. 7184
| 6
proJecT MaNager
DeLFiNO “cHiNO” cONSuNji
Fields oF experTise:
experieNce
39 Ye ARS OF

ADA RAMP SIDEWALKPAVEMENT WIDENINGROADWAY
QUalIFIcaTIoNs
• BS: Civil Engineering, University of the Philippines, 1986 • Certificates: Engineering Management for Construction, UCLA Extension, 1991; Building Construction & Management, AOTS Japan, 1990; Inland Navigation & Management, IFIT Belgium, 1989 • PE #57908: Professional Engineer, EXP: June 30, 2026 experIeNce
broadWa y aNd MaNchesTer a VeNUe rehabiliTaTioN proJecTs, aNaheiM Chino was the Project Manager for the City of Anaheim for the Broadway from Euclid Street to Harbor Boulevard and Manchester Avenue from South City Limit to Anaheim Boulevard Street Rehabilitation Projects. The project included rehabilitating approximately 7,000 linear feet (1.3 miles) of Broadway and 7,000 linear feet (1.3 miles) of Manchester Avenue. The project also included designing 27 curb ramps that were non-compliant and 76 driveways. arTerial sTreeT IMproVeMeNT proJecT, FoUNTaiN V alley
Chino was the Project Manager for the Arterial Street Improvement Project in the City of Fountain Valley.

This project focused on the rehabilitation of critical arterial roadways, enhancing safety and mobility for both residents and visitors. The project included Ellis Avenue from Brookhurst Street to Ward Street, approximately 2,600 linear feet; Ward Street from Apache River Avenue to Ellis Avenue, approximately 1,140 linear feet; Newhope Street from Edinger Avenue to Heil Avenue, approximately 2,600 linear feet; and Slater Avenue from Brookhurst Street to Ward Street, approximately 2,600 linear feet. In total, the project covered approximately 8,940 linear feet of roadway improvements. The scope of work featured a combination of a 3-inch grind with ARHM overlay, including a leveling course, Type II slurry, and extensive concrete improvements. These enhancements included sidewalk upgrades, ADA-compliant ramps, driveway reconstructions, and curb and gutter improvements, all designed to ensure long-lasting durability and significantly improved driving conditions on these vital thoroughfares. resideNTial sTreeTs paVeMeNT rehabiliTaTioN proJecTs-areas 1, 2, & 4, doWNey Chino was the Project Manager for the City of Downey on the Residential Streets Pavement Rehabilitation Project for Areas 1, 2, and 4. The main objective was to improve the PCI of the area residential street segments in order to extend the street service life, improve safety, minimize costs and maintenance needs, and enhance aesthetics.

In order to accurately develop a scope of work and fees for the design services, OE conducted a detailed field evaluation, a thorough review of the City’s Pavement Management Plan, and approximated the costs for the construction activities to develop a final list of residential street segments. OE was then able to determine the quantity of streets that could be incorporated into the engineering design, which rehabilitation method to use and which method could be feasibly rehabilitated while adhering to the City’s available budget, along with providing recommendations and estimates. Upon approval by the City, the team then began to prepare separate PS&E packages for areas 1, 2 and 4. The work across the three zones covered nearly 29 miles of residential streets. On a number of segments OE used straight grade between tie-in points at adjacent segments to maximized drainage slopes. A total of 164 Curb Ramps were reconstructed to meet ADA compliance along with 85 total driveways, in addition to street widening and single-sided street parking construction. Collaboration with Caltrans, LA County Flood Control District and Union Pacific Rail Road was also performed in order to acquire permit acquisitions on the segments. The work was completed on time and within budget.

Resumes
Onward Engineering | Design Smarter. Build Better.

Request For Proposal, for the City of Norwalk,
Carmenita Road Rehabilitation, Project No. 7184
| 7
lead proJecT eNgiNeer
RYAN DeNNIS, P. eNG.

Fields oF experTise:
experieNce
19 Ye ARS OF

ADA RAMP SIDEWALKPAVEMENT WIDENINGROADWAY
QUalIFIcaTIoNs
• P. E n g .: APEGA Registered Civil Engineer
• BS: Civil Engineering, Minor in Environmental Engineering, University of Calgary, 2005 • Certified: AutoCAD & Civil 3D
experIeNce
arTerial sTreeT IMproVeMeNT proJecT, FoUNTaiN V alley
Ryan served as the Lead Project Engineer for the Arterial Street Improvement Project in the City of Fountain Valley.

This project focused on the rehabilitation of critical arterial roadways, enhancing safety and mobility for both residents and visitors. The project included Ellis Avenue from Brookhurst Street to Ward Street, approximately 2,600 linear feet; Ward Street from Apache River Avenue to Ellis Avenue, approximately 1,140 linear feet; Newhope Street from Edinger Avenue to Heil Avenue, approximately 2,600 linear feet; and Slater Avenue from Brookhurst Street to Ward Street, approximately 2,600 linear feet. In total, the project covered approximately 8,940 linear feet of roadway improvements. The scope of work featured a combination of a 3-inch grind with ARHM overlay, including a leveling course, Type II slurry, and extensive concrete improvements. These enhancements included sidewalk upgrades, ADA-compliant ramps, driveway reconstructions, and curb and gutter improvements, all designed to ensure long-lasting durability and significantly improved driving conditions on these vital thoroughfares.

Fy 2023-24 paVeMeNT MaNageMeNT prograM IMpleMeNTaTioN proJecT, gleNdale Ryan served as the Lead Project Engineer for the City of Glendale on the Fiscal Year 2023 to 2024 Pavement Management Program Implementation Project. The purpose of this project was to rehabilitate approximately 48,650 linear feet (9.2 miles) of street, a total of 60 streets in all. OE was tasked with providing designs for pavement resurfacing and reconstruction; curb, gutter and sidewalk repairs at 9 separate locations; a total of 124 ADA curb ramps and driveways construction; catch basin enhancements; bus stop improvements and relocations; sewer point repairs; tree well installation and tree planting; utility appurtenance adjustments and relocations; signing and striping; and surveying well monument installations and replacements. Additional work included sewer video inspection to identify sewer defects and preparing sanitary sewer plans for repairs that included point repairs, and sectional and full-length slip lining, along with Traffic Control plans. OE also acquired no-fee permits for ground distrubance work within the City’s right-of-way.

Fy 2022-23 a NNUal paVeMeNT rehab IlITaTIoN proJecT, phases 1-4 , WhITTI er Ryan served as the Lead Project Engineer for the City of Whittier with Engineering Design services through 4 phases of their Annual Pavement Rehabilitation Project. The project purpose was to rehabilitate approximately 49,000 linear feet (9.3 miles) of 46 streets with a variety of slurry and cape seal, and grind and overlay in order to achieve an extended pavement service life while minimizing future maintenance needs, improve safety and enhance aesthetics. The required work involved pavement, curb, gutter and sidewalk repair and rehabilitation, reconstructing 62 ADA curb ramps (52 with missing truncated domes), replacing 9 cross gutters, utility appurtenance adjusting and relocating, and signing and striping. The project also required Caltrans Encroachment Permits for streets around Whittier Boulevard, and permits for the Union Pacific Railroad (UPRR) due to street proximity to the right-of-way on the southwest end. OE’s in-house Laser Scanner was utilized to capture visible indications of surface utilities, trees, utility poles, luminaries, fencing, walls, sidewalks, hardscape, signs, and edge of pavement lying within the ramp locations, as well as lip of gutter, flow-line, top of curb, and back of walk elevations were documented. The survey also extended beyond the ramp’s BCRs/ECRs to ensure proper tie-in to the existing infrastructure.

Resumes
Onward Engineering | Design Smarter. Build Better.

Request For Proposal, for the City of Norwalk,
Carmenita Road Rehabilitation, Project No. 7184
| 8
The following is our scope of work for design engineering services integrated with the site-specific tasks outlined in the City’s Request for Proposal, to which no exceptions are taken.

PHASe 1
1 | MeetiNGS
- Meeting Minutes and Agenda (digital copies) - Project Schedule Updates (digital copies) OE will coordinate and lead the following meetings:
• Kick-Off Meeting.
• 65% and 90% Plan Check Meetings ( 2 total).
2 | ReSeARcH AND ReVieW AVAiLAbLe DAtA
- Existing Records (digital copies)
The OE team will compile and review all available records and documents from the City and other third-party sources including:
• As-Built Plans/Atlas Maps (i.e. sewer, storm, water, traffic signals, utilities). • Survey Data (i.e. topography, aerial photographs, centerlines, monuments, property boundaries). • Pavement Management Plan.
• Geotechnical Investigation Reports.
3 | utiLitY ReSeARcH AND NOtiFicAtiON
- Utility Contact Matrix (digital copy) - First, Second, and Final Utility Notices (digital copies) - Utility Owner Correspondence and Records (digital copies) The utility research and notification will consist of the following tasks:
• Compile a contact information list of potential utility owners utilizing City and DigAlert records. • Prepare the first utility notice following kick-off meeting to inform utility owners of the upcoming project and request information pertaining to their utilities such as verification of the sizes, depths, and locations of their underground lines, facilities, and substructures within the project vicinity. • Prepare the second utility notice following completion of 65% plans to provide utility owners with the plans and prompt them to identify any revisions they require to the information related to their utilities. Additionally, identify any utilities that require relocation.
• Prepare the final utility notice following completion of the 100% plans to provide utility owners with the final plans, provide additional details regarding the upcoming construction activities, and provide final notice that utilities must be relocated immediately if not already completed. • Create a utility contact matrix to summarize utility owner contact information and track receipt of as-built information. 4 | GeOtecHNicAL INVeStiGAtiON
- Geotechnical Investigation Report (digital copy)
A pavement and subsurface evaluation will be conducted by Noorzay Geotechnical Services based on the primary tasks outlined in the RFP. The geotechnical assessment will be conducted at a frequency of 1 borehole per 500 linear feet ( 5 boreholes total) along the street. The general scope of work is as follows:
• Mark borehole locations.
• Obtain a no-fee encroachment permit from the City.
• Call USA to mark utilities.
• Provide traffic control in accordance with the MUTCD. • Drill 5 exploratory boreholes in the pavement within the City right-of-way to depths of approximately 5 feet below grade or until refusal.
• Backfill boreholes with soil cuttings and finish surface with cold mix asphalt. • Conduct laboratory testing including but not limited to: R-value . • Prepare a Geotechnical Investigation Report with a summary of pavement and soil conditions, as well as design recommendations for pavement rehabilitation.

Allowances have not been included for capping boreholes with hot-mix asphalt, or utilizing specialized drilling rigs to drill through macadam pavement or gravel/cobbles. These items can be included in the geotechnical scope of work for an additional cost.

Scope of Work
Onward Engineering | Design Smarter. Build Better.

Request For Proposal, for the City of Norwalk,
Carmenita Road Rehabilitation, Project No. 7184
| 9
cOPe OF WORKS
PHASe 2
5 | DRONe MAPPiNG
- Aerial Photographs (digital copies)
Aerial photographs will be taken within the project limits to document site features, utility appurtenance locations, and striping configurations.
6 | tOPOGRAPH ic SuRVeY
- Survey Data Files (digital copies) - Autocad Survey Base Map (digital copy) A topographic survey will be conducted by OE and will include the following tasks:
• Establish horizontal control referencing the California Coordinate System of 1983 (CCS83) and vertical control referencing the North American Vertical Datum 1988. • Survey centerline monuments and ties to establish centerline and right-of-way alignments. • Survey street cross sections at 50-foot intervals. The standard cross-sectional data will consist of Right- of-Way, Back of Walk, Top of Curb, Flow Line, Gutter Lip, and Crown for both sides of the street. • Survey visible utility appurtenances within the street right-of-way. 7 | bASe MAPS
- Right-of-Way, Street, and Utility AutoCAD Base Maps (digital copies) The following base maps will be prepared in AutoCAD:
• Centerline and ROW (utilizing gis maps, tract maps).
• Existing street layout (utilizing aerial photographs, field observations). • Existing utilities layout (utilizing atlas maps, and as-built plans). 8 | Site eVALuAtiON
- Site Evaluation Notes and Photographs (digital copies) OE will conduct a site evaluation during the preliminary design phase to gather the following information:
• Verify records drawings and data.
• Evaluate existing site conditions.
• Identify proposed improvements.
• Field mark repair locations.
• Collect street level photographs of design conflicts and areas of interest. • Prepare repair location spreadsheet.
9 | PS&e ceRtiFicAtiON AND e-76 cONStRuctiON AutHORiZAtiON - E-76 Request for Authorization Form (digital copies)
OE will prepare the PS&E Certification and the E-76 Construction Authorization for the City. First, the design team must ensure that all plans, specifications, and estimates are complete and follow the scope of work that was prepared in the approved grant funding application and that Caltrans Standards are followed. The specifications must include the PS&E checklist items required for federal funded projects. Once the PS&E package has been prepared with all the necessary documents, the E-76 Request for Construction Authorization form is prepared to formally request permission from Caltrans to proceed with construction. This requires ensuring that all required environmental clearances, permits, and any other necessary documentation are in place. OE will work with the City in coordinating the E-76 Request for Authorization process with Caltrans. 10 | 65% PS&e
- 65% Plans (digital copies) - 65% Specifications (digital copies) - 65% Cost Estimate (digital copies) PLANS
The plans will be drafted using the City’s standard title block, notes, and formatting, as well as conventional line styles. All plans will be developed using the latest AutoCAD Civil 3D software at the following scales unless instructed otherwise by the City:

Scope of Work
Request For Proposal, for the City of Norwalk,
Carmenita Road Rehabilitation, Project No. 7184
| 10
Sheet Type Horizontal Scale Vertical Scale
Title Sheet N/A N/A
Typical Sections NTS NTS
Ramp Details 1” = 5’ N/A
Driveway Details 1” = 5’ N/A
Street Cross Sections 1” = 10’ N/A
Demolition Plans 1” = 40’ N/A
Utility Relocation Plans 1” = 40’ N/A
Right-of-Way Requirements Plans 1” = 40’ N/A
Street Improvement Plans and Profiles 1” = 40’ 1” = 4’
Signing and Striping Plans 1” = 40’ N/A
Designs will adhere to the latest editions of the governing standards for each design component which may include the following:

Design Element
Americans with
Disabilities Act
Standards for
Accessible Design
Caltrans California
Manual on Uniform
Traffic Devices
Caltrans
Standard Plans
City of Norwalk
Standard Plans
Standard Plans for
Public Works
Construction
Street
Improvements X X
Concrete
Infrastructure
Improvements
X X X
Signing and
Striping X X

SPECIFICATIONS
Development of the Specifications will include the following tasks:
• Acquire boilerplate templates from the City.
• Update template text to include project specific information. • Update Project Bid Schedule to match cost estimate bid items and quantities. • Check General Provisions and Special Provisions section numbering, and titles for consistency with the referenced edition of the Standard Specifications for Public Works Construction (Greenbook) or Caltrans Standard Specifications, where applicable.
• Add pay clauses to Special Provisions that match the Project Bid Schedule. • Add any additional provisions requested by the City or deemed necessary due to the project design and construction.

COST ESTIMATE
Development of the Cost Estimate will include the following tasks:
• Review cost templates provided by the City to verify typical bid items and descriptions. • Compile quantities based on measurements from plan sheets and the site evaluation spreadsheet. • Develop unit rate construction costs from recently awarded projects based on data from the following sources:
- PlanetBids.
- Bid summaries from recent City projects.
- Bid summaries from recent OE projects.
- Caltrans Construction Cost Database.

SUBMITTALS
Electronic copies of the plans, specifications, and cost estimate will be submitted to the City for review and feedback. OE will coordinate a Plan Check Meeting with the City following completion of their review.

Scope of Work
Request For Proposal, for the City of Norwalk,
Carmenita Road Rehabilitation, Project No. 7184
| 11
PHASe 3
11 | 90% PS&e
- 65% Submittal Review Comments/Responses and Red-lined Plans (digital copies) - 90% Plans (digital copies) - 90% Specifications (digital copies) - 90% Cost Estimate (digital copies) The 90% plans, specifications, and estimate will be prepared and submitted following the same processes described in the 65% submittal task.
12 | 100% PS&e
- 90% Submittal Review Comments/Responses and Red-lined Plans (digital copies) - 100% Plans (digital copy and hard copy – 24” x 36” format on bond paper, signed and stamped) - 100% Specifications (digital copy and hard copy – 8.5” x 11” format on bond paper) - 100% Cost Estimate (digital copy and hard copy – 8.5” x 11” format on bond paper) - Complete PS&E Package (digital copies – USB Thumb Drive) - AutoCAD and PDF Design Files (digital copies – USB Thumb Drive) The 100% PS&E will be prepared and submitted following the same processes described in the 65% and 90% submittal tasks.

PHASe 4
13 | biD ASSiStANce AND cONStRuctiON SuPPORt
- Responses to Design Inquiries (digital copies)
- As-Built Plans (digital copies)
- Autocad and PDF Design Files (digital copies – USB thumb drive) OE will provide the following ongoing support services during the bid and construction phases:

BID PHASE
• Attend pre-bid meeting.
• Prepare responses to Requests for Information ( 4 RFIs). • Prepare contract addenda ( 2 addenda).

CONSTRUCTION PHASE
• Attend pre-construction meeting.
• Conduct field inspections as requested ( 4 total).
• Respond to RFIs ( 8 RFIs).
• Review submittals ( 12 submittals).
• Prepare as-built plans.

Revisions to the PS&E package or providing additional administrative support can be done at the City’s request on a time and material basis using the hourly rates in our fee proposal. Additionally, we can provide full-service construction management and inspection services upon City request. 14 | PRe-cONStRuctiON SuRVeY MONuMeNt PReSeRVAtiON
- Corner Records (digital copies) - Autocad Survey Base Map (digital copy) Pre-construction monument surveys will be conducted by OE and will include the following tasks:
• Prepare pre-construction corner records for approximately 4 existing centerline monuments in accordance with the California Land Surveyor’s Act 8771(b).
• File pre-construction corner records with the Orange County Surveyor’s Office. 15 | POSt-cONStRuctiON SuRVeY MONuMeNt PReSeRVAtiON
- Corner Records (digital copies) - Autocad Survey Base Map (digital copy) Post-construction monument surveys will be conducted by OE and will include the following tasks:
• Prepare post-construction corner records for approximately 4 existing centerline monuments in accordance with the California Land Surveyor’s Act 8771(b).
• File post-construction corner records with the Orange County Surveyor’s Office.

Scope of Work
Request For Proposal, for the City of Norwalk,
Carmenita Road Rehabilitation, Project No. 7184
| 12
AuGuSt SePteMbeR OctObeR
1 10 15 20 25 30 15 10 15 20 25 30 15 10 15 20 25 305
ID tASKS DAYS beGIN eND
PHASe 1 31 8/4/25 9/15/25
1 Kick-Off Meeting 1 8/4/25 8/4/25
2 Research and Review Available Data 2 8/5/25 8/6/25
3 Utility Research and Notification (First Notice) 2 8/5/25 8/6/25 4 Geotechnical Investigation - Preliminary Recommendations 20 8/5/25 9/1/25 5 Geotechnical Investigation - Final Report 10 9/2/25 9/15/25 PHASe 2 34 8/5/25 9/19/25
6 Drone Mapping 2 8/5/25 8/6/25
7 Topographic Survey 10 8/7/25 8/20/25
8 Base Maps 2 8/21/25 8/22/25
9 Site Evaluation 1 8/25/25 8/25/25
10 Preliminary Environmental Study (PES) 10 8/25/25 9/5/25 11 65% PS&E 15 8/25/25 9/12/25
12 Utility Research and Notification (Second Notice) 1 9/15/25 9/15/25 13 Submit 65% PS&E to City 1 9/15/25 9/15/25
14 City Review of 65% PS&E 5 9/15/25 9/19/25
PHASe 3 24 9/15/25 10/16/25
15 Right-of-Way Certification and Request for Authorization (E-76) 23 9/15/25 10/15/25 16 90% PS&E 12 9/15/25 9/30/25
17 Submit 90% PS&E to City 1 10/1/25 10/1/25
18 City Review of 90% PS&E 5 10/1/25 10/7/25
19 100% PS&E 10 10/1/25 10/14/25
20 Submit 100% PS&E to City 1 10/15/25 10/15/25
21 Utility Research and Notification (Final Notice) 1 10/16/25 10/16/25 PHASe 4 TBD TBD
22 Bid Assistance TBD TBD
23 Pre-Construction Monument Survey TBD TBD
24 Construction Support TBD TBD
25 Post-Construction Monument Survey TBD TBD
Schedule
300 S. Harbor Blvd.

Suite 814
Anaheim, CA. 92805
Onward Engineering | Design Smarter. Build Better.
| 13
Request For Proposal, for the City of Norwalk,
Carmenita Road Rehabilitation, Project No. 7184
cHeDuLeS
PROject
eNGiNeeRS
$140.00
HOuRLY
Oe
tOtAL HO uRS
GRAND
Oe
Sub-tOtAL
cOSt
QA/Qc
MANAGeR
$200.00
HOuRLY
PROject
MANAGeR
$180.00
HOuRLY
PARtY
cHIeF
$220.00
HOuRLY
cHAIN/

ROD MAN
$180.00
HOuRLY
ONWARD e NGIN eeRING
PHASe 1 PHAS e 1
1 Meetings 11 8 19 $3, 100.00 $3, 100.00
2 Research & Review 6 6 12 $1,920.00 $1,920.00
3 Utility Notification 4 28 32 $4,640.00 $4,640.00
4 Geotechnical Investigation 8 4 12 $2,000.00 $10,237.50 $10,237.50 $12,237.50 5 Prepare Federal Funding Documents 6 48 170 224 $33,640.00 $33,640.00 SUB-TOTAL 6 77 216 299 $45,300.00 $10,237.50 $10,237.50 $55,537.50 PHASe 2 PHAS e 2
6 Drone Mapping 2 4 8 8 22 $4, 120.00 $4, 120.00
7 Topographic Survey 4 12 40 40 96 $18,400.00 $18,400.00 8 Base Maps 5 36 41 $5,940.00 $5,940.00
9 Site Evaluation 2 18 20 $2,880.00 $2,880.00
10 65% PS&E 16 56 194 266 $40,440.00 $40,440.00
SUB-TOTAL 16 69 264 48 48 445 $71,780.00 $71,780.00
PHASe 3 PHAS e 3
11 90% PS&E 8 48 140 196 $29,840.00 $29,840.00
12 100% PS&E 8 32 100 140 $21,360.00 $21,360.00
SUB-TOTAL 16 80 240 336 $51,200.00 $51,200.00
PHASe 4 PHAS e 4
13 Bid Assistance & Construction Support 48 22 70 $11,720.00 $11,720.00 14 Pre-Construction Monument Survey 2 8 12 12 34 $6,320.00 $6,320.00 15 Post-Construction Monument Survey 2 8 12 12 34 $6,320.00 $6,320.00 SUB-TOTAL 4 48 38 24 24 138 $24,360.00 $24,360.00
ToTal hoUrs aNd cosTs 42 274 758 72 72 1218 $192,640.00 $10,237.50 $10,237.50 $202,877.50 SubcONS uLtANt cOSt
Sub-
cONSuLtANt
Sub-tOtAL cOSt

NOORZAY
LuMP SuM
Cost Proposal
Onward Engineering | Design Smarter. Build Better.
|
Request For Proposal, for the City of Norwalk,
Carmenita Road Rehabilitation, Project No. 7184
OSt PROPOSAL cARMeNitA ROAD ReHAbiLitAtiON, PROject NO. 7184 c
Oe
tOtAL HO uRS
GRAND
cONStRuctION
MANAGeR
$180.00
HOuRLY
ONWARD e NGIN eeRING
PHAS e 1 PHAS e 1
1 Pre-construction 44 44 $7,920.00

1.1 Contructability Review 12 12 $2,160.00

1.2 Preliminary Field Walk 8 8 $1,440.00

1.3 Pre-construction Meeting 4 4 $720.00

1.4 Repond to RFIs 20 20 $3,600.00
SUB-TOTAL 44 44 $7,920.00
PHAS e 2 PHAS e 2
2 Construction 204 204 $36,720.00
2 .1 Construction Management 180 180 $32,400.00

2.2 Submittal Review 24 24 $4,320.00
SUB-TOTAL 204 204 $36,720.00
PHAS e 3 PHAS e 3
3 Post-Construction 10 10 $1,800.00
3 .1 Punchlist 2 2 $360.00

3.2 Final Walkthrough 2 2 $360.00

3.3 Final Payment Recommendation 4 4 $720.00

3.4 Prepare and Deliver Project Files 2 2 $360.00
SUB-TOTAL 10 10 $1,800.00
ToTal hoUrs aNd cosTs 258 258 $46,440.00
Staff Augmentation Fee
Onward Engineering | Design Smarter. Build Better.

Request For Proposal, for the City of Norwalk,
Carmenita Road Rehabilitation, Project No. 7184 |
tAFF AuGMeNtA tiON FeeS

← All documents from this meeting